ANEXO 7 " SUSTENTO DE METRADOS ESTRUCTURAS BLOQUE S.S.H.

H 2"

ITEM PARTIDA UND CANT LARGO ANCHO ALTO PARCIAL TOTAL
VECES
2 ESTRUCTURAS
2.1 MOVIMIENTO DE TIERRAS
2.1.2 EXCAVACIONES
2.1.1 EXCAVACIÓN MASIVA CON EQUIPO PESADO M3 26.01
BLOQUE S.S.H.H 2-PLANTA CIMENTACION M3 26.01
Z-1 2.00 1.00 1.50 1.50 1.70 7.65
Z-2 1.00 1.00 2.00 2.00 1.70 6.80
Z-3 1.00 1.00 2.00 1.50 1.70 5.10
Z-4 2.00 1.00 2.00 0.95 1.70 6.46
2.1.2 EXCAVACIÓN DE ZANJAS PARA CIMIENTOS M3 11.83
BLOQUE S.S.H.H 2-PLANTA CIMENTACION M3 11.83
EJE B/ ENTRE EJE 1' Y 1
1.00 1.00 1.25 0.40 1.60 0.80
EJE D/ ENTRE EJE 1' Y 2
1.00 1.00 3.45 0.40 1.60 2.21
EJE C/ ENTRE EJE 1' Y 2
1.00 1.00 4.20 0.40 1.60 2.69
EJE 1/ ENTRE EJE B Y C
1.00 1.00 0.40 0.40 1.60 0.26
EJE 1/ ENTRE EJE C Y D
1.00 1.00 1.59 0.40 1.60 1.02
EJE 2/ ENTRE EJE B Y C
1.00 1.00 0.92 0.40 1.10 0.40
EJE 2/ ENTRE EJE C Y D
1.00 1.00 1.59 0.40 1.60 1.02
ENTRE EJES B Y C/ ENTRE EJE 1' Y 2
1.00 1.00 2.23 0.40 1.60 1.43
ENTRE EJES C Y D/ ENTRE EJE 1 Y 1'
1.00 1.00 3.60 0.40 1.10 1.58
2.00 1.00 0.49 0.40 1.10 0.43
2.1.3 RELLENOS
2.1.3.1 RELLENO COMPACTADO P/ ESTRUCTURAS C/MATERIAL PROPIO M3 11.69
BLOQUE S.S.H.H 2-PLANTA CIMENTACION M3 11.69
RELLENO EN ZAPATAS M3 10.28
Z-1
2.00 1.00 AREA= 1.36 1.00 2.71
Z-2
1.00 1.00 AREA= 2.85 1.00 2.85
Z-3
1.00 1.00 AREA= 2.41 1.00 2.41
Z-4
1.00 1.00 AREA= 1.19 1.00 1.19
1.00 1.00 AREA= 1.12 1.00 1.12
RELLENO EN CIMIENTOS CORRIDOS M3 1.41
EJE B/ ENTRE EJE 1' Y 1
1.00 1.00 2.65 0.25 0.20 0.13
EJE D/ ENTRE EJE 1' Y 2
1.00 1.00 4.85 0.25 0.20 0.24
EJE C/ ENTRE EJE 1' Y 2
1.00 1.00 1.91 0.40 0.20 0.15
1.00 1.00 2.96 0.25 0.20 0.15
EJE 1/ ENTRE EJE B Y C
1.00 1.00 1.80 0.25 0.20 0.09
EJE 1/ ENTRE EJE C Y D
1.00 1.00 2.99 0.25 0.20 0.15
EJE 2/ ENTRE EJE B Y C
1.00 1.00 1.10 0.40 0.20 0.09
EJE 2/ ENTRE EJE C Y D
1.00 1.00 0.70 0.15 0.20 0.02
1.00 1.00 0.31 0.40 0.20 0.02
ENTRE EJES B Y C/ ENTRE EJE 1' Y 2
1.00 1.00 2.03 0.25 0.20 0.10
1.00 1.00 0.90 0.25 0.20 0.05
ENTRE EJES C Y D/ ENTRE EJE 1 Y 1'
1.00 1.00 3.30 0.25 0.20 0.17
2.00 1.00 0.46 0.25 0.20 0.05
2.2 OBRAS DE CONCRETO SIMPLE
2.2.2 SOLADO
2.2.1.1 SOLADO DE CONCRETO C:H 1:10 E=2" M2 23.69
ZAPATAS / BLOQUE S.S.H.H 2-PLANTA CIMENTACION M2 15.30
Z-1 2.00 1.00 1.50 1.50 4.50
Z-2 1.00 1.00 2.00 2.00 4.00
Z-3 1.00 1.00 2.00 1.50 3.00
Z-4 2.00 1.00 2.00 0.95 3.80
VIGAS DE CIMENTACION / BLOQUE S.S.H.H 2-PLANTA CIMENTACION M2 8.39
EJE B/ ENTRE EJE 1' Y 1
1.00 1.00 1.25 0.40 1.60 0.80
EJE D/ ENTRE EJE 1' Y 2
1.00 1.00 3.45 0.40 1.60 2.21
EJE C/ ENTRE EJE 1' Y 2
1.00 1.00 4.20 0.40 1.60 2.69
EJE 1/ ENTRE EJE B Y C
1.00 1.00 0.40 0.40 1.60 0.26
EJE 1/ ENTRE EJE C Y D
1.00 1.00 1.59 0.40 1.60 1.02
EJE 2/ ENTRE EJE B Y C
1.00 1.00 0.92 0.40 1.10 0.40
EJE 2/ ENTRE EJE C Y D
1.00 1.00 1.59 0.40 1.60 1.02
2.2.2 CIMIENTOS
2.2.2.1 CIMIENTOS CONCRETO C:H 1:10 + 30%P.G. M3 8.45
BLOQUE S.S.H.H 2-PLANTA CIMENTACION M3 8.45
EJE B/ ENTRE EJE 1' Y 1
1.00 1.00 2.65 0.40 0.80 0.85
EJE D/ ENTRE EJE 1' Y 2
1.00 1.00 4.85 0.40 0.80 1.55
EJE C/ ENTRE EJE 1' Y 2
1.00 1.00 1.91 0.40 0.80 0.61
1.00 1.00 2.96 0.40 0.80 0.95
ANEXO 7 " SUSTENTO DE METRADOS ESTRUCTURAS BLOQUE S.S.H.H 2"

ITEM PARTIDA UND CANT LARGO ANCHO ALTO PARCIAL TOTAL
VECES
EJE 1/ ENTRE EJE B Y C
1.00 1.00 1.80 0.40 0.80 0.58
EJE 1/ ENTRE EJE C Y D
1.00 1.00 2.99 0.40 0.80 0.96
EJE 2/ ENTRE EJE B Y C
1.00 1.00 1.10 0.40 0.80 0.35
EJE 2/ ENTRE EJE C Y D
1.00 1.00 0.70 0.40 0.80 0.22
1.00 1.00 0.31 0.40 0.80 0.10
ENTRE EJES B Y C/ ENTRE EJE 1' Y 2
1.00 1.00 2.03 0.40 0.80 0.65
1.00 1.00 0.90 0.40 0.80 0.29
ENTRE EJES C Y D/ ENTRE EJE 1 Y 1'
1.00 1.00 3.30 0.40 0.80 1.06
2.00 1.00 0.46 0.40 0.80 0.29
2.2.2.2 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS M2 42.27
BLOQUE S.S.H.H 2-PLANTA CIMENTACION M2 42.27
EJE B/ ENTRE EJE 1' Y 1
1.00 2.00 Longitud= 2.65 0.80 4.24
EJE D/ ENTRE EJE 1' Y 2
1.00 2.00 Longitud= 4.85 0.80 7.76
EJE C/ ENTRE EJE 1' Y 2
1.00 2.00 Longitud= 1.91 0.80 3.06
1.00 2.00 Longitud= 2.96 0.80 4.74
EJE 1/ ENTRE EJE B Y C
1.00 2.00 Longitud= 1.80 0.80 2.88
EJE 1/ ENTRE EJE C Y D
1.00 2.00 Longitud= 2.99 0.80 4.78
EJE 2/ ENTRE EJE B Y C
1.00 2.00 Longitud= 1.10 0.80 1.76
EJE 2/ ENTRE EJE C Y D
1.00 2.00 Longitud= 0.70 0.80 1.12
1.00 2.00 Longitud= 0.31 0.80 0.50
ENTRE EJES B Y C/ ENTRE EJE 1' Y 2
1.00 2.00 Longitud= 2.03 0.80 3.25
1.00 2.00 Longitud= 0.90 0.80 1.44
ENTRE EJES C Y D/ ENTRE EJE 1 Y 1'
1.00 2.00 Longitud= 3.30 0.80 5.28
2.00 2.00 Longitud= 0.46 0.80 1.47
2.2.3 SOBRECIMIENTOS
2.2.3.1 SOBRECIMIENTO - CONCRETO 1:8 + 25% P.M M3 1.83
BLOQUE S.S.H.H 2-PLANTA CIMENTACION M3 1.83
EJE B/ ENTRE EJE 1' Y 1
1.00 1.00 2.20 0.15 0.50 0.17
EJE D/ ENTRE EJE 1' Y 2
1.00 1.00 4.20 0.15 0.50 0.32
EJE C/ ENTRE EJE 1' Y 2
1.00 1.00 2.56 0.15 0.50 0.19
EJE 1/ ENTRE EJE B Y C
1.00 1.00 1.35 0.15 0.50 0.10
EJE 1/ ENTRE EJE C Y D
1.00 1.00 2.39 0.15 0.50 0.18
EJE 2/ ENTRE EJE C Y D
1.00 1.00 1.70 0.25 0.50 0.21
ENTRE EJES B Y C/ ENTRE EJE 1' Y 2
1.00 1.00 2.03 0.15 0.50 0.15
1.00 1.00 0.90 0.15 0.50 0.07
1.00 1.00 0.52 0.15 0.50 0.04
1.00 1.00 0.53 0.15 0.50 0.04
ENTRE EJES C Y D/ ENTRE EJE 1 Y 1'
1.00 1.00 3.49 0.15 0.50 0.26
2.00 1.00 0.73 0.15 0.50 0.11
2.2.3.2 SOBRECIMIENTO - ENCOFRADO Y DESENCOFRADO M2 19.78
BLOQUE S.S.H.H 2-PLANTA CIMENTACION M2 19.78
EJE B/ ENTRE EJE 1' Y 1
1.00 1.00 Longitud= 2.20 0.70 1.54
EJE D/ ENTRE EJE 1' Y 2
1.00 1.00 Longitud= 4.20 0.70 2.94
EJE C/ ENTRE EJE 1' Y 2
1.00 1.00 Longitud= 2.56 1.00 2.56
EJE 1/ ENTRE EJE B Y C
1.00 1.00 Longitud= 1.35 0.70 0.95
EJE 1/ ENTRE EJE C Y D
1.00 1.00 Longitud= 2.39 0.70 1.67
EJE 2/ ENTRE EJE C Y D
1.00 1.00 Longitud= 1.70 0.70 1.19
ENTRE EJES B Y C/ ENTRE EJE 1' Y 2
1.00 1.00 Longitud= 2.03 1.00 2.03
1.00 1.00 Longitud= 0.90 1.00 0.90
1.00 1.00 Longitud= 0.52 1.00 0.52
1.00 1.00 Longitud= 0.53 1.00 0.53
ENTRE EJES C Y D/ ENTRE EJE 1 Y 1'
1.00 1.00 Longitud= 3.49 1.00 3.49
2.00 1.00 Longitud= 0.73 1.00 1.46
2.2.4 FALSO PISO
2.2.4.1 FALSO PISO MEZCLA C:H 1:8 E=10cm M2 36.09
BLOQUE S.S.H.H 2-PLANTA CIMENTACION M2 36.09
1.00 1.00 AREA= 36.09 36.09
2.3 OBRAS DE CONCRETO ARMADO
2.3.1 ZAPATAS
2.3.1.1 CONCRETO PREMEZCLADO f'c=280kg/cm2 - ZAPATAS M3 9.18
BLOQUE S.S.H.H 2-PLANTA CIMENTACION M3 9.18
Z-1 2.00 1.00 1.50 1.50 0.60 2.70
Z-2 1.00 1.00 2.00 2.00 0.60 2.40
Z-3 1.00 1.00 2.00 1.50 0.60 1.80
Z-4 2.00 1.00 2.00 0.95 0.60 2.28
2.3.1.2 ENCOFRADO Y DESENCOFRADO NORMAL DE ZAPATAS M2 23.28
BLOQUE S.S.H.H 2-PLANTA CIMENTACION M2 23.28
Z-1 2.00 1.00 Longitud= 6.00 0.60 7.20
ANEXO 7 " SUSTENTO DE METRADOS ESTRUCTURAS BLOQUE S.S.H.H 2"

ITEM PARTIDA UND CANT LARGO ANCHO ALTO PARCIAL TOTAL
VECES
Z-2 1.00 1.00 Longitud= 8.00 0.60 4.80
Z-3 1.00 1.00 Longitud= 7.00 0.60 4.20
Z-4 2.00 1.00 Longitud= 5.90 0.60 7.08
2.3.1.3 ACERO DE REFUERZO fy=4200 kg/cm2 - ZAPATAS KG 964.40
BLOQUE S.S.H.H 2-PLANTA CIMENTACION KG 964.40
Z-1
Longitudinal Ø 3/4" 4.00 7 1.35 Factor= 2.24 84.48
Transversal Ø 3/4" 4.00 7 1.35 Factor= 2.24 84.48
Ganchos Longitudinales Ø 3/4" 4.00 14 0.45 Factor= 2.24 56.32
Ganchos Transversales Ø 3/4" 4.00 14 0.45 Factor= 2.24 56.32
Z-2
Longitudinal Ø 3/4" 2.00 10 1.85 Factor= 2.24 82.70
Transversal Ø 3/4" 2.00 10 1.85 Factor= 2.24 82.70
Ganchos Longitudinales Ø 3/4" 2.00 20 0.45 Factor= 2.24 40.23
Ganchos Transversales Ø 3/4" 2.00 20 0.45 Factor= 2.24 40.23
Z-3
Longitudinal Ø 3/4" 2.00 7 1.85 Factor= 2.24 57.89
Transversal Ø 3/4" 2.00 10 1.35 Factor= 2.24 60.35
Ganchos Longitudinales Ø 3/4" 2.00 14 0.45 Factor= 2.24 28.16
Ganchos Transversales Ø 3/4" 2.00 20 0.45 Factor= 2.24 40.23
Z-4
Longitudinal Ø 3/4" 4.00 4 1.85 Factor= 2.24 66.16
Transversal Ø 3/4" 4.00 10 0.80 Factor= 2.24 71.52
Ganchos Longitudinales Ø 3/4" 4.00 8 0.45 Factor= 2.24 32.18
Ganchos Transversales Ø 3/4" 4.00 20 0.45 Factor= 2.24 80.46
2.3.2 VIGAS DE CIMENTACION
2.3.2.1 CONCRETO PREMEZCLADO f'c=280kg/cm2 - VIGAS DE CIMENTACIÓN M3 2.50
BLOQUE S.S.H.H 2-PLANTA CIMENTACION M3 2.50
EJE B/ ENTRE EJE 1' Y 1
1.00 1.00 1.25 0.40 0.50 0.25
EJE D/ ENTRE EJE 1' Y 2
1.00 1.00 3.45 0.40 0.50 0.69
EJE C/ ENTRE EJE 1' Y 2
1.00 1.00 4.20 0.40 0.50 0.84
EJE 1/ ENTRE EJE B Y C
1.00 1.00 0.40 0.40 0.50 0.08
EJE 1/ ENTRE EJE C Y D
1.00 1.00 1.59 0.40 0.50 0.32
EJE 2/ ENTRE EJE C Y D
1.00 1.00 1.59 0.40 0.50 0.32
2.3.2.2 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGAS DE CIMENTACIÓN M2 12.48
BLOQUE S.S.H.H 2-PLANTA CIMENTACION M2 12.48
EJE B/ ENTRE EJE 1' Y 1
1.00 2.00 Longitud= 1.25 0.50 1.25
EJE D/ ENTRE EJE 1' Y 2
1.00 2.00 Longitud= 3.45 0.50 3.45
EJE C/ ENTRE EJE 1' Y 2
1.00 2.00 Longitud= 4.20 0.50 4.20
EJE 1/ ENTRE EJE B Y C
1.00 2.00 Longitud= 0.40 0.50 0.40
EJE 1/ ENTRE EJE C Y D
1.00 2.00 Longitud= 1.59 0.50 1.59
EJE 2/ ENTRE EJE C Y D
1.00 2.00 Longitud= 1.59 0.50 1.59
2.3.2.3 ACERO DE REFUERZO fy=4200 kg/cm2 - VIGAS DE CIMENTACIÓN KG 621.77
BLOQUE S.S.H.H 2-PLANTA CIMENTACION KG 621.77
EJE B/ ENTRE EJE 1' Y 1
Longitudinal Ø 5/8" 1.00 10.00 3.90 Factor= 1.55 60.53
Ganchos Ø 5/8" 1.00 20.00 0.35 Factor= 1.55 10.86
Estribos Ø 3/8" 1.00 21 1.65 Factor= 0.56 19.40
EJE D/ ENTRE EJE 1' Y 2
Longitudinal Ø 5/8" 1.00 10.00 6.30 Factor= 1.55 97.78
Ganchos Ø 5/8" 1.00 20.00 0.35 Factor= 1.55 10.86
Estribos Ø 3/8" 1.00 33 1.65 Factor= 0.56 30.49
EJE C/ ENTRE EJE 1' Y 2
Longitudinal Ø 5/8" 1.00 10.00 6.04 Factor= 1.55 93.74
Ganchos Ø 5/8" 1.00 20.00 0.35 Factor= 1.55 10.86
Estribos Ø 3/8" 1.00 32 1.65 Factor= 0.56 29.57
EJE 1/ ENTRE EJE B Y C
Longitudinal Ø 5/8" 1.00 10.00 3.05 Factor= 1.55 47.34
Ganchos Ø 5/8" 1.00 20.00 0.35 Factor= 1.55 10.86
Estribos Ø 3/8" 1.00 17 1.65 Factor= 0.56 15.71
EJE 1/ ENTRE EJE C Y D
Longitudinal Ø 5/8" 1.00 10.00 3.64 Factor= 1.55 56.49
Ganchos Ø 5/8" 1.00 20.00 0.35 Factor= 1.55 10.86
Estribos Ø 3/8" 1.00 20 1.65 Factor= 0.56 18.48
EJE 2/ ENTRE EJE C Y D
Longitudinal Ø 5/8" 1.00 10.00 4.24 Factor= 1.55 65.80
Ganchos Ø 5/8" 1.00 20.00 0.35 Factor= 1.55 10.86
Estribos Ø 3/8" 1.00 23 1.65 Factor= 0.56 21.25
2.3.5 COLUMNAS Y COLUMNETAS
2.3.5.1 CONCRETO PREMEZCLADO f'c=280kg/cm2 - COLUMNAS M3 33.66
BLOQUE S.S.H.H 2-PLANTA CIMENTACION HASTA PLANTA 2 NFP M3 19.89
CR 2.00 1.00 0.25 0.60 4.00 1.20
CL-1 3.00 1.00 AREA= 0.33 4.00 3.96
CL-2 1.00 1.00 AREA= 0.24 4.00 0.96
BLOQUE S.S.H.H 2-PLANTA 2 NFP HASTA PLANTA 3 NFP M3 4.59
CR 2.00 1.00 0.25 0.60 3.00 0.90
CL-1 3.00 1.00 AREA= 0.33 3.00 2.97
CL-2 1.00 1.00 AREA= 0.24 3.00 0.72
BLOQUE S.S.H.H 2-PLANTA 3 NFP HASTA PLANTA 4 NFP M3 4.59
CR 2.00 1.00 0.25 0.60 3.00 0.90
CL-1 3.00 1.00 AREA= 0.33 3.00 2.97
CL-2 1.00 1.00 AREA= 0.24 3.00 0.72
BLOQUE S.S.H.H 2-PLANTA 4 NFP HASTA PLANTA NT M3 4.59
ANEXO 7 " SUSTENTO DE METRADOS ESTRUCTURAS BLOQUE S.S.H.H 2"

ITEM PARTIDA UND CANT LARGO ANCHO ALTO PARCIAL TOTAL
VECES
CR 2.00 1.00 0.25 0.60 3.00 0.90
CL-1 3.00 1.00 AREA= 0.33 3.00 2.97
CL-2 1.00 1.00 AREA= 0.24 3.00 0.72
2.3.5.2 ENCOFRADO Y DESENCOFRADO NORMAL DE COLUMNAS M3 200.20
BLOQUE S.S.H.H 2-PLANTA CIMENTACION HASTA PLANTA 2 NFP M3 61.60
CR 2.00 1.00 Longitud= 1.70 4.00 13.60
CL-1 3.00 1.00 Longitud= 3.20 4.00 38.40
CL-2 1.00 1.00 Longitud= 2.40 4.00 9.60
BLOQUE S.S.H.H 2-PLANTA 2 NFP HASTA PLANTA 3 NFP M3 46.20
CR 2.00 1.00 Longitud= 1.70 3.00 10.20
CL-1 3.00 1.00 Longitud= 3.20 3.00 28.80
CL-2 1.00 1.00 Longitud= 2.40 3.00 7.20
BLOQUE S.S.H.H 2-PLANTA 3 NFP HASTA PLANTA 4 NFP M3 46.20
CR 2.00 1.00 Longitud= 1.70 3.00 10.20
CL-1 3.00 1.00 Longitud= 3.20 3.00 28.80
CL-2 1.00 1.00 Longitud= 2.40 3.00 7.20
BLOQUE S.S.H.H 2-PLANTA 4 NFP HASTA PLANTA NT M3 46.20
CR 2.00 1.00 Longitud= 1.70 3.00 10.20
CL-1 3.00 1.00 Longitud= 3.20 3.00 28.80
CL-2 1.00 1.00 Longitud= 2.40 3.00 7.20
2.3.5.3 ACERO DE REFUERZO fy=4200 kg/cm2 - COLUMNAS KG 4313.54
BLOQUE S.S.H.H 2-PLANTA CIMENTACION HASTA PLANTA NT KG 2383.50
CR
verticales Ø 5/8" 2.00 16.00 12.92 Factor= 1.55 641.66
ganchos Ø 5/8" 2.00 32.00 0.35 Factor= 1.55 34.76
Empalme Ø 5/8" 2.00 16.00 0.60 Factor= 1.55 29.80
CL-1
verticales Ø 5/8" 3.00 20.00 12.92 Factor= 1.55 1203.11
ganchos Ø 5/8" 3.00 40.00 0.35 Factor= 1.55 65.18
Empalme Ø 5/8" 3.00 20.00 0.60 Factor= 1.55 55.87
CL-2
verticales Ø 5/8" 1.00 16.00 12.92 Factor= 1.55 320.83
ganchos Ø 5/8" 1.00 32.00 0.35 Factor= 1.55 17.38
Empalme Ø 5/8" 1.00 16.00 0.60 Factor= 1.55 14.90
BLOQUE S.S.H.H 2-PLANTA CIMENTACION HASTA PLANTA 2 NFP KG 546.56
CR
Estribos Ø 3/8" 2.00 96.00 0.37 Factor= 0.56 39.78
Estribos Ø 3/8" 2.00 192.00 0.37 Factor= 0.56 79.56
Estribos Ø 3/8" 2.00 64.00 1.21 Factor= 0.56 86.73
CL-1
Estribos Ø 3/8" 3.00 96.00 0.37 Factor= 0.56 59.67
Estribos Ø 3/8" 3.00 32.00 1.92 Factor= 0.56 103.22
Estribos Ø 3/8" 3.00 32.00 1.92 Factor= 0.56 103.22
CL-2
Estribos Ø 3/8" 1.00 96.00 0.37 Factor= 0.56 19.89
Estribos Ø 3/8" 1.00 32.00 1.52 Factor= 0.56 27.24
Estribos Ø 3/8" 1.00 32.00 1.52 Factor= 0.56 27.24
BLOQUE S.S.H.H 2-PLANTA 2 NFP HASTA PLANTA 3 NFP KG 461.16
CR
Estribos Ø 3/8" 2.00 81.00 0.37 Factor= 0.56 33.57
Estribos Ø 3/8" 2.00 162.00 0.37 Factor= 0.56 67.13
Estribos Ø 3/8" 2.00 54.00 1.21 Factor= 0.56 73.18
CL-1
Estribos Ø 3/8" 3.00 81.00 0.37 Factor= 0.56 50.35
Estribos Ø 3/8" 3.00 27.00 1.92 Factor= 0.56 87.09
Estribos Ø 3/8" 3.00 27.00 1.92 Factor= 0.56 87.09
CL-2
Estribos Ø 3/8" 1.00 81.00 0.37 Factor= 0.56 16.78
Estribos Ø 3/8" 1.00 27.00 1.52 Factor= 0.56 22.98
Estribos Ø 3/8" 1.00 27.00 1.52 Factor= 0.56 22.98
BLOQUE S.S.H.H 2-PLANTA 3 NFP HASTA PLANTA 4 NFP KG 461.16
CR
Estribos Ø 3/8" 2.00 81.00 0.37 Factor= 0.56 33.57
Estribos Ø 3/8" 2.00 162.00 0.37 Factor= 0.56 67.13
Estribos Ø 3/8" 2.00 54.00 1.21 Factor= 0.56 73.18
CL-1
Estribos Ø 3/8" 3.00 81.00 0.37 Factor= 0.56 50.35
Estribos Ø 3/8" 3.00 27.00 1.92 Factor= 0.56 87.09
Estribos Ø 3/8" 3.00 27.00 1.92 Factor= 0.56 87.09
CL-2
Estribos Ø 3/8" 1.00 81.00 0.37 Factor= 0.56 16.78
Estribos Ø 3/8" 1.00 27.00 1.52 Factor= 0.56 22.98
Estribos Ø 3/8" 1.00 27.00 1.52 Factor= 0.56 22.98
BLOQUE S.S.H.H 2-PLANTA 4 NFP HASTA PLANTA NT KG 461.16
CR
Estribos Ø 3/8" 2.00 81.00 0.37 Factor= 0.56 33.57
Estribos Ø 3/8" 2.00 162.00 0.37 Factor= 0.56 67.13
Estribos Ø 3/8" 2.00 54.00 1.21 Factor= 0.56 73.18
CL-1
Estribos Ø 3/8" 3.00 81.00 0.37 Factor= 0.56 50.35
Estribos Ø 3/8" 3.00 27.00 1.92 Factor= 0.56 87.09
Estribos Ø 3/8" 3.00 27.00 1.92 Factor= 0.56 87.09
CL-2
Estribos Ø 3/8" 1.00 81.00 0.37 Factor= 0.56 16.78
Estribos Ø 3/8" 1.00 27.00 1.52 Factor= 0.56 22.98
Estribos Ø 3/8" 1.00 27.00 1.52 Factor= 0.56 22.98
2.3.5.4 CONCRETO FABRICADO EN OBRA f'c=175kg/cm2 - COLUMNETAS M3 3.96
BLOQUE S.S.H.H 2-PLANTA CIMENTACION HASTA PLANTA 2 NFP M3 1.42
EJE B/ ENTRE EJE 1' Y 1
CA-1 3.00 1.00 0.20 0.13 2.80 0.22
EJE D/ ENTRE EJE 1' Y 2
CA-1 3.00 1.00 0.20 0.13 2.80 0.22
EJE C/ ENTRE EJE 1' Y 2
CA-1 2.00 1.00 0.20 0.13 2.80 0.15
EJE 1/ ENTRE EJE B Y C
CA-1 2.00 1.00 0.20 0.13 2.80 0.15
EJE 1/ ENTRE EJE C Y D
CA-1 3.00 1.00 0.20 0.13 2.80 0.22
EJE 2/ ENTRE EJE B Y C
CA-1 2.00 1.00 0.20 0.13 2.80 0.15
EJE 2/ ENTRE EJE C Y D
ANEXO 7 " SUSTENTO DE METRADOS ESTRUCTURAS BLOQUE S.S.H.H 2"

ITEM PARTIDA UND CANT LARGO ANCHO ALTO PARCIAL TOTAL
VECES
CA-2 2.00 1.00 0.23 0.13 2.80 0.17
ENTRE EJES B Y C/ ENTRE EJE 1' Y 2
CA-1 1.00 1.00 0.20 0.13 3.10 0.08
ENTRE EJES C Y D/ ENTRE EJE 1 Y 1'
CA-1 1.00 1.00 0.20 0.13 3.10 0.08
BLOQUE S.S.H.H 2- PLANTA 2 NFP HASTA PLANTA 3 NFP M3 1.27
EJE B/ ENTRE EJE 1' Y 1
CA-1 3.00 1.00 0.20 0.13 2.50 0.20
EJE D/ ENTRE EJE 1' Y 2
CA-1 3.00 1.00 0.20 0.13 2.50 0.20
EJE C/ ENTRE EJE 1' Y 2
CA-1 2.00 1.00 0.20 0.13 2.50 0.13
EJE 1/ ENTRE EJE B Y C
CA-1 2.00 1.00 0.20 0.13 2.50 0.13
EJE 1/ ENTRE EJE C Y D
CA-1 3.00 1.00 0.20 0.13 2.50 0.20
EJE 2/ ENTRE EJE B Y C
CA-1 2.00 1.00 0.20 0.13 2.50 0.13
EJE 2/ ENTRE EJE C Y D
CA-2 2.00 1.00 0.23 0.13 2.50 0.15
ENTRE EJES B Y C/ ENTRE EJE 1' Y 2
CA-1 1.00 1.00 0.20 0.13 2.80 0.07
ENTRE EJES C Y D/ ENTRE EJE 1 Y 1'
CA-1 1.00 1.00 0.20 0.13 2.80 0.07
BLOQUE S.S.H.H 2- PLANTA 3 NFP HASTA PLANTA 4 NFP M3 1.27
EJE B/ ENTRE EJE 1' Y 1
CA-1 3.00 1.00 0.20 0.13 2.50 0.20
EJE D/ ENTRE EJE 1' Y 2
CA-1 3.00 1.00 0.20 0.13 2.50 0.20
EJE C/ ENTRE EJE 1' Y 2
CA-1 2.00 1.00 0.20 0.13 2.50 0.13
EJE 1/ ENTRE EJE B Y C
CA-1 2.00 1.00 0.20 0.13 2.50 0.13
EJE 1/ ENTRE EJE C Y D
CA-1 3.00 1.00 0.20 0.13 2.50 0.20
EJE 2/ ENTRE EJE B Y C
CA-1 2.00 1.00 0.20 0.13 2.50 0.13
EJE 2/ ENTRE EJE C Y D
CA-2 2.00 1.00 0.23 0.13 2.50 0.15
ENTRE EJES B Y C/ ENTRE EJE 1' Y 2
CA-1 1.00 1.00 0.20 0.13 2.80 0.07
ENTRE EJES C Y D/ ENTRE EJE 1 Y 1'
CA-1 1.00 1.00 0.20 0.13 2.80 0.07
2.3.5.5 ENCOFRADO Y DESENCOFRADO NORMAL DE COLUMNETAS M2 86.44
BLOQUE S.S.H.H 2-PLANTA CIMENTACION HASTA PLANTA 2 NFP M2 31.00
EJE B/ ENTRE EJE 1' Y 1
CA-1 3.00 1.00 Longitud= 0.53 2.80 4.45
EJE D/ ENTRE EJE 1' Y 2
CA-1 2.00 1.00 Longitud= 0.53 2.80 2.97
CA-1 1.00 1.00 Longitud= 0.66 2.80 1.85
EJE C/ ENTRE EJE 1' Y 2
CA-1 1.00 1.00 Longitud= 0.53 2.80 1.48
CA-1 1.00 1.00 Longitud= 0.66 2.80 1.85
EJE 1/ ENTRE EJE B Y C
CA-1 2.00 1.00 Longitud= 0.53 2.80 2.97
EJE 1/ ENTRE EJE C Y D
CA-1 2.00 1.00 Longitud= 0.53 2.80 2.97
CA-1 1.00 1.00 Longitud= 0.66 2.80 1.85
EJE 2/ ENTRE EJE B Y C
CA-1 1.00 1.00 Longitud= 0.66 2.80 1.85
CA-1 1.00 1.00 Longitud= 0.46 2.80 1.29
EJE 2/ ENTRE EJE C Y D
CA-2 1.00 1.00 Longitud= 0.72 2.80 2.02
CA-2 1.00 1.00 Longitud= 0.49 2.80 1.37
ENTRE EJES B Y C/ ENTRE EJE 1' Y 2
CA-1 1.00 1.00 Longitud= 0.66 3.10 2.05
ENTRE EJES C Y D/ ENTRE EJE 1 Y 1'
CA-1 1.00 1.00 Longitud= 0.66 3.10 2.05
BLOQUE S.S.H.H 2-PLANTA 2 NFP HASTA PLANTA 3 NFP M2 27.72
EJE B/ ENTRE EJE 1' Y 1
CA-1 3.00 1.00 Longitud= 0.53 2.50 3.98
EJE D/ ENTRE EJE 1' Y 2
CA-1 2.00 1.00 Longitud= 0.53 2.50 2.65
CA-1 1.00 1.00 Longitud= 0.66 2.50 1.65
EJE C/ ENTRE EJE 1' Y 2
CA-1 1.00 1.00 Longitud= 0.53 2.50 1.33
CA-1 1.00 1.00 Longitud= 0.66 2.50 1.65
EJE 1/ ENTRE EJE B Y C
CA-1 2.00 1.00 Longitud= 0.53 2.50 2.65
EJE 1/ ENTRE EJE C Y D
CA-1 2.00 1.00 Longitud= 0.53 2.50 2.65
CA-1 1.00 1.00 Longitud= 0.66 2.50 1.65
EJE 2/ ENTRE EJE B Y C
CA-1 1.00 1.00 Longitud= 0.66 2.50 1.65
CA-1 1.00 1.00 Longitud= 0.46 2.50 1.15
EJE 2/ ENTRE EJE C Y D
CA-2 1.00 1.00 Longitud= 0.72 2.50 1.80
CA-2 1.00 1.00 Longitud= 0.49 2.50 1.23
ENTRE EJES B Y C/ ENTRE EJE 1' Y 2
CA-1 1.00 1.00 Longitud= 0.66 2.80 1.85
ENTRE EJES C Y D/ ENTRE EJE 1 Y 1'
CA-1 1.00 1.00 Longitud= 0.66 2.80 1.85
BLOQUE S.S.H.H 2-PLANTA 3 NFP HASTA PLANTA 4 NFP M2 27.72
EJE B/ ENTRE EJE 1' Y 1
CA-1 3.00 1.00 Longitud= 0.53 2.50 3.98
EJE D/ ENTRE EJE 1' Y 2
CA-1 2.00 1.00 Longitud= 0.53 2.50 2.65
CA-1 1.00 1.00 Longitud= 0.66 2.50 1.65
EJE C/ ENTRE EJE 1' Y 2
CA-1 1.00 1.00 Longitud= 0.53 2.50 1.33
CA-1 1.00 1.00 Longitud= 0.66 2.50 1.65
EJE 1/ ENTRE EJE B Y C
ANEXO 7 " SUSTENTO DE METRADOS ESTRUCTURAS BLOQUE S.S.H.H 2"

ITEM PARTIDA UND CANT LARGO ANCHO ALTO PARCIAL TOTAL
VECES
CA-1 2.00 1.00 Longitud= 0.53 2.50 2.65
EJE 1/ ENTRE EJE C Y D
CA-1 2.00 1.00 Longitud= 0.53 2.50 2.65
CA-1 1.00 1.00 Longitud= 0.66 2.50 1.65
EJE 2/ ENTRE EJE B Y C
CA-1 1.00 1.00 Longitud= 0.66 2.50 1.65
CA-1 1.00 1.00 Longitud= 0.46 2.50 1.15
EJE 2/ ENTRE EJE C Y D
CA-2 1.00 1.00 Longitud= 0.72 2.50 1.80
CA-2 1.00 1.00 Longitud= 0.49 2.50 1.23
ENTRE EJES B Y C/ ENTRE EJE 1' Y 2
CA-1 1.00 1.00 Longitud= 0.66 2.80 1.85
ENTRE EJES C Y D/ ENTRE EJE 1 Y 1'
CA-1 1.00 1.00 Longitud= 0.66 2.80 1.85
2.3.5.6 ACERO DE REFUERZO fy=4200 kg/cm2 - COLUMNETAS KG 613.22
BLOQUE S.S.H.H 2-PLANTA CIMENTACION HASTA PLANTA 2 NFP KG 215.34
EJE B/ ENTRE EJE 1' Y 1
CA-1
Verticales Ø3/8" 3.00 4.00 2.72 Factor= 0.56 18.28
Ganchos Ø3/8" 3.00 8.00 0.20 Factor= 0.56 2.69
Estribos Ø1/4" 3.00 25 0.66 Factor= 0.22 10.99
EJE D/ ENTRE EJE 1' Y 2
CA-1
Verticales Ø3/8" 3.00 4.00 2.72 Factor= 0.56 18.28
Ganchos Ø3/8" 3.00 8.00 0.20 Factor= 0.56 2.69
Estribos Ø1/4" 3.00 25 0.66 Factor= 0.22 10.99
EJE C/ ENTRE EJE 1' Y 2
CA-1
Verticales Ø3/8" 2.00 4.00 2.72 Factor= 0.56 12.19
Ganchos Ø3/8" 2.00 8.00 0.20 Factor= 0.56 1.79
Estribos Ø1/4" 2.00 25 0.66 Factor= 0.22 7.33
EJE 1/ ENTRE EJE B Y C
CA-1
Verticales Ø3/8" 2.00 4.00 2.72 Factor= 0.56 12.19
Ganchos Ø3/8" 2.00 8.00 0.20 Factor= 0.56 1.79
Estribos Ø1/4" 2.00 25 0.66 Factor= 0.22 7.33
EJE 1/ ENTRE EJE C Y D
CA-1
Verticales Ø3/8" 3.00 4.00 2.72 Factor= 0.56 18.28
Ganchos Ø3/8" 3.00 8.00 0.20 Factor= 0.56 2.69
Estribos Ø1/4" 3.00 25 0.66 Factor= 0.22 10.99
EJE 2/ ENTRE EJE B Y C
Verticales Ø3/8" 3.00 4.00 2.72 Factor= 0.56 18.28
Ganchos Ø3/8" 3.00 8.00 0.20 Factor= 0.56 2.69
Estribos Ø1/4" 3.00 25 0.66 Factor= 0.22 10.99
EJE 2/ ENTRE EJE C Y D
CA-2
Verticales Ø3/8" 2.00 4.00 2.72 Factor= 0.56 12.19
Ganchos Ø3/8" 2.00 8.00 0.20 Factor= 0.56 1.79
Estribos Ø1/4" 2.00 25 0.72 Factor= 0.22 7.99
ENTRE EJES B Y C/ ENTRE EJE 1' Y 2
CA-1
Verticales Ø3/8" 1.00 4.00 3.02 Factor= 0.56 6.76
Ganchos Ø3/8" 1.00 8.00 0.20 Factor= 0.56 0.90
Estribos Ø1/4" 1.00 26 0.66 Factor= 0.22 3.81
ENTRE EJES C Y D/ ENTRE EJE 1 Y 1'
CA-1
Verticales Ø3/8" 1.00 4.00 3.02 Factor= 0.56 6.76
Ganchos Ø3/8" 1.00 8.00 0.20 Factor= 0.56 0.90
Estribos Ø1/4" 1.00 26 0.66 Factor= 0.22 3.81
BLOQUE S.S.H.H 2- PLANTA 2 NFP HASTA PLANTA 3 NFP KG 198.94
EJE B/ ENTRE EJE 1' Y 1
CA-1
Verticales Ø3/8" 3.00 4.00 2.42 Factor= 0.56 16.26
Ganchos Ø3/8" 3.00 8.00 0.20 Factor= 0.56 2.69
Estribos Ø1/4" 3.00 24 0.66 Factor= 0.22 10.55
EJE D/ ENTRE EJE 1' Y 2
CA-1
Verticales Ø3/8" 3.00 4.00 2.42 Factor= 0.56 16.26
Ganchos Ø3/8" 3.00 8.00 0.20 Factor= 0.56 2.69
Estribos Ø1/4" 3.00 24 0.66 Factor= 0.22 10.55
EJE C/ ENTRE EJE 1' Y 2
CA-1
Verticales Ø3/8" 2.00 4.00 2.42 Factor= 0.56 10.84
Ganchos Ø3/8" 2.00 8.00 0.20 Factor= 0.56 1.79
Estribos Ø1/4" 2.00 24 0.66 Factor= 0.22 7.03
EJE 1/ ENTRE EJE B Y C
CA-1
Verticales Ø3/8" 2.00 4.00 2.42 Factor= 0.56 10.84
Ganchos Ø3/8" 2.00 8.00 0.20 Factor= 0.56 1.79
Estribos Ø1/4" 2.00 24 0.66 Factor= 0.22 7.03
EJE 1/ ENTRE EJE C Y D
CA-1
Verticales Ø3/8" 3.00 4.00 2.42 Factor= 0.56 16.26
Ganchos Ø3/8" 3.00 8.00 0.20 Factor= 0.56 2.69
Estribos Ø1/4" 3.00 24 0.66 Factor= 0.22 10.55
EJE 2/ ENTRE EJE B Y C
CA-1
Verticales Ø3/8" 3.00 4.00 2.42 Factor= 0.56 16.26
Ganchos Ø3/8" 3.00 8.00 0.20 Factor= 0.56 2.69
Estribos Ø1/4" 3.00 24 0.66 Factor= 0.22 10.55
EJE 2/ ENTRE EJE C Y D
ANEXO 7 " SUSTENTO DE METRADOS ESTRUCTURAS BLOQUE S.S.H.H 2"

ITEM PARTIDA UND CANT LARGO ANCHO ALTO PARCIAL TOTAL
VECES
CA-2
Verticales Ø3/8" 2.00 4.00 2.42 Factor= 0.56 10.84
Ganchos Ø3/8" 2.00 8.00 0.20 Factor= 0.56 1.79
Estribos Ø1/4" 2.00 24 0.72 Factor= 0.22 7.67
ENTRE EJES B Y C/ ENTRE EJE 1' Y 2
CA-1
Verticales Ø3/8" 1.00 4.00 2.72 Factor= 0.56 6.09
Ganchos Ø3/8" 1.00 8.00 0.20 Factor= 0.56 0.90
Estribos Ø1/4" 1.00 25 0.66 Factor= 0.22 3.66
ENTRE EJES C Y D/ ENTRE EJE 1 Y 1'
CA-1
Verticales Ø3/8" 1.00 4.00 2.72 Factor= 0.56 6.09
Ganchos Ø3/8" 1.00 8.00 0.20 Factor= 0.56 0.90
Estribos Ø1/4" 1.00 25 0.66 Factor= 0.22 3.66
BLOQUE S.S.H.H 2- PLANTA 3 NFP HASTA PLANTA 4 NFP KG 198.94
EJE B/ ENTRE EJE 1' Y 1
CA-1
Verticales Ø3/8" 3.00 4.00 2.42 Factor= 0.56 16.26
Ganchos Ø3/8" 3.00 8.00 0.20 Factor= 0.56 2.69
Estribos Ø1/4" 3.00 24 0.66 Factor= 0.22 10.55
EJE D/ ENTRE EJE 1' Y 2
CA-1
Verticales Ø3/8" 3.00 4.00 2.42 Factor= 0.56 16.26
Ganchos Ø3/8" 3.00 8.00 0.20 Factor= 0.56 2.69
Estribos Ø1/4" 3.00 24 0.66 Factor= 0.22 10.55
EJE C/ ENTRE EJE 1' Y 2
CA-1
Verticales Ø3/8" 2.00 4.00 2.42 Factor= 0.56 10.84
Ganchos Ø3/8" 2.00 8.00 0.20 Factor= 0.56 1.79
Estribos Ø1/4" 2.00 24 0.66 Factor= 0.22 7.03
EJE 1/ ENTRE EJE B Y C
CA-1
Verticales Ø3/8" 2.00 4.00 2.42 Factor= 0.56 10.84
Ganchos Ø3/8" 2.00 8.00 0.20 Factor= 0.56 1.79
Estribos Ø1/4" 2.00 24 0.66 Factor= 0.22 7.03
EJE 1/ ENTRE EJE C Y D
CA-1
Verticales Ø3/8" 3.00 4.00 2.42 Factor= 0.56 16.26
Ganchos Ø3/8" 3.00 8.00 0.20 Factor= 0.56 2.69
Estribos Ø1/4" 3.00 24 0.66 Factor= 0.22 10.55
EJE 2/ ENTRE EJE B Y C
CA-1
Verticales Ø3/8" 3.00 4.00 2.42 Factor= 0.56 16.26
Ganchos Ø3/8" 3.00 8.00 0.20 Factor= 0.56 2.69
Estribos Ø1/4" 3.00 24 0.66 Factor= 0.22 10.55
EJE 2/ ENTRE EJE C Y D
CA-2
Verticales Ø3/8" 2.00 4.00 2.42 Factor= 0.56 10.84
Ganchos Ø3/8" 2.00 8.00 0.20 Factor= 0.56 1.79
Estribos Ø1/4" 2.00 24 0.72 Factor= 0.22 7.67
ENTRE EJES B Y C/ ENTRE EJE 1' Y 2
CA-1
Verticales Ø3/8" 1.00 4.00 2.72 Factor= 0.56 6.09
Ganchos Ø3/8" 1.00 8.00 0.20 Factor= 0.56 0.90
Estribos Ø1/4" 1.00 25 0.66 Factor= 0.22 3.66
ENTRE EJES C Y D/ ENTRE EJE 1 Y 1'
CA-1
Verticales Ø3/8" 1.00 4.00 2.72 Factor= 0.56 6.09
Ganchos Ø3/8" 1.00 8.00 0.20 Factor= 0.56 0.90
Estribos Ø1/4" 1.00 25 0.66 Factor= 0.22 3.66