METRADOS DE OBRA

ESTRUCTURA
OBRA: VIVIENDA CHURCAMPA
MUNICIPALIDAD DISTRITAL DE CHURCAMPA
DISTRITO: Churcampa PROVINCIA: Huancavelica DEPARTAMENTO: Huancavelica

# DIMENSIONES METRADO
PART. DESCRIPCION VECES
UNID.
LARGO ANCHO ALTO PARCIAL S.TOTAL TOTAL

01.00 ESTRUCTURAS
01.01 TRABAJOS PRELIMINARES
01.01.01 Trazo niveles y replanteo 01 27.60 17.56 484.66 484.66 M2

01.02 MOVIMIENTO DE TIERRAS


01.02.01 Excavación p. Zapatas
Excavacion de Znajas para Zapatas 95.40 M3
Z-1(2.85 X 2.40 ) 02 2.85 2.40 1.60 21.89
Z-2 (2.30 X 1.90 ) 06 2.30 1.90 1.60 41.95
Z-3 (2.00 X 1.60 ) 05 2.00 1.60 1.60 25.60
Z-4 (0.25 X 0.25 ) 01 0.90 0.90 1.20 0.97
Z-5 (0.25 X 0.25 ) 06 0.80 0.80 1.20 4.61
ZAPATA ESCALERA 01 1.60 0.40 0.60 0.38

01.02.02 Excavación p. cimientos corridos


Excavación de zanja para cimientos 27.18 M3
material suelto H=0.80 m
Excavación de zanja para cimientos(muro de cabeza) 15.65
TRANSVERSALES
EN EJE 1-1 , ENTRE B - C ( AUDITORIUM ) 01 5.45 0.50 0.80 2.18
EN EJE 1-1 Y 2-2, ENTRE A-A Y B-B (INFORMES) 01 7.13 0.50 0.80 2.85
EN EJE 8-8, ENTRE B' y C-C ( CAMERINO DAMAS) 01 1.45 0.50 0.80 0.58
EN EJE 8-8, ENTRE B-B Y B' ( CAMERINO VARONES ) 01 2.35 0.50 0.80 0.94

LONGITUDINAL
EN EJE A-A , ENTRE 1-1 ( RETIRO ) 01 1.00 0.50 0.80 0.40
EN EJE A-A , ENTRE 1-2 ( INFORMES ) 01 2.75 0.50 0.80 1.10
EN EJE A-A , ENTRE 2-3 ( SSHH. VARONES ) 01 3.37 0.50 0.80 1.35
EN EJE 1-1 Y 2-2, ENTRE A-A Y B-B (HALL) 01 1.00 0.50 0.80 0.40
EN EJEC-C , ENTRE 1-1 Y 2-2 (AUDITORIUM) 01 2.70 0.50 0.80 1.08
EN EJEC-C , ENTRE 2-2 Y 3-3 (AUDITORIUM) 01 3.20 0.50 0.80 1.28
EN EJEC-C , ENTRE 3-3 Y 4-4 (AUDITORIUM) 01 3.20 0.50 0.80 1.28
EN EJEC-C , ENTRE 4-4 Y 5-5 (AUDITORIUM) 01 3.36 0.50 0.80 1.34
EN EJEC-C , ENTRE 5-5 Y 7-7 (SH-D ) 01 0.61 0.50 0.80 0.24
EN EJEC-C , ENTRE 7-7 Y 8-8 (CAM. DAMAS) 01 1.55 0.50 0.80 0.62

Excavación de zanja para cimientos(muro de soga) 11.53


material suelto H=0.60 m
TRANSVERSALES
EN EJE 1-1 Y 2-2, ENTRE A-A Y B-B ( INFORMES ) 01 2.40 0.40 0.60 0.58
EN EJE 2-2, ENTRE A-A Y B-B ( INFORMES ) 01 0.30 0.40 0.60 0.07
EN EJE 2-2 Y 3-3, ENTRE A-A Y B-B ( SSHH. ) 01 1.90 0.40 0.60 0.46
EN EJE 3-3, ENTRE A-A Y B-B 01 4.42 0.40 0.60 1.06
EN EJE 5-5 ENTRE B-B Y C-C ( ESCENARIO ) 01 1.55 0.40 0.60 0.37
EN EJE 7-7 ENTRE B-B Y B!-B! ( PRE ESCENARIO ) 01 2.20 0.40 0.60 0.53
EN EJE 7-7 ENTRE B!-B! Y C-C ( PRE ESCENARIO ) 01 0.75 0.40 0.60 0.18
EN EJE 7-7 Y 8-8, ENTRE B-B Y B!-B! ( SH-V ) 01 2.00 0.40 0.60 0.48
EN EJE 7-7 Y 8-8, ENTRE B!-B! Y C-C ( CAM. DAMAS ) 01 0.92 0.40 0.60 0.22
LONGITUDINAL
EN EJE A-A Y B-B ENTRE 1-1 Y 2-2 ( INFORMES ) 01 1.55 0.40 0.60 0.37
EN EJE B-B ENTRE 1-1 Y 2-2 ( HALL ) 01 2.15 0.40 0.60 0.52
EN EJE A-A Y B-B ENTRE 2-2 Y 3-3 (SH-VARONES ) 01 4.05 0.40 0.60 0.97
EN EJE A-A Y B-B ENTRE 2-2 Y 3-3 (SH-DAMAS ) 01 6.15 0.40 0.60 1.48
EN EJE B-B ENTRE 2-2 Y 3-3 (AUDITORIUM ) 01 2.70 0.40 0.60 0.65
EN EJE B-B ENTRE 3-3 Y 4-4 (AUDITORIUM ) 01 2.95 0.40 0.60 0.71
# DIMENSIONES METRADO
PART. DESCRIPCION VECES
UNID.
LARGO ANCHO ALTO PARCIAL S.TOTAL TOTAL

EN EJE B-B ENTRE 4-4 Y 5-5 (AUDITORIUM ) 01 3.36 0.40 0.60 0.81
EN EJE B' Y B-B ENTRE 5-5 Y 7-7 (PRE ESCENARIO ) 01 0.70 0.40 0.60 0.17
EN EJE C-C Y B' ENTER 6-6 Y 7-7 ( SH-D ) 01 1.60 0.40 0.60 0.38
EN EJE B' Y B-B ENTRE 7-7 Y 8-8 ( SH V+ CAM. VARONES ) 01 3.15 0.40 0.60 0.76
EN EJE B' Y B-B ENTRE 7-7 Y 8-8 ( SH V ) 01 1.05 0.40 0.60 0.25
EN EJE B' ENTRE 7-7 Y 8-8 ( SH V+ CAM. VARONES ) 01 2.18 0.40 0.60 0.52

01.03 CONCRETO SIMPLE


01.03.01 Cimientos corridos 27.18 M3
Cimientos Corridos 1:8 + 30% P.G.(muro de cabeza) 15.65
TRANSVERSALES
EN EJE 1-1 , ENTRE B - C ( AUDITORIUM ) 01 5.45 0.50 0.80 2.18
EN EJE 1-1 Y 2-2, ENTRE A-A Y B-B (INFORMES) 01 7.13 0.50 0.80 2.85
EN EJE 8-8, ENTRE B' y C-C ( CAMERINO DAMAS) 01 1.45 0.50 0.80 0.58
EN EJE 8-8, ENTRE B-B Y B' ( CAMERINO VARONES ) 01 2.35 0.50 0.80 0.94
LONGITUDINAL
EN EJE A-A , ENTRE 1-1 ( RETIRO ) 01 1.00 0.50 0.80 0.40
EN EJE A-A , ENTRE 1-2 ( INFORMES ) 01 2.75 0.50 0.80 1.10
EN EJE A-A , ENTRE 2-3 ( SSHH. VARONES ) 01 3.37 0.50 0.80 1.35
EN EJE 1-1 Y 2-2, ENTRE A-A Y B-B (HALL) 01 1.00 0.50 0.80 0.40
EN EJEC-C , ENTRE 1-1 Y 2-2 (AUDITORIUM) 01 2.70 0.50 0.80 1.08
EN EJEC-C , ENTRE 2-2 Y 3-3 (AUDITORIUM) 01 3.20 0.50 0.80 1.28
EN EJEC-C , ENTRE 3-3 Y 4-4 (AUDITORIUM) 01 3.20 0.50 0.80 1.28
EN EJEC-C , ENTRE 4-4 Y 5-5 (AUDITORIUM) 01 3.36 0.50 0.80 1.34
EN EJEC-C , ENTRE 5-5 Y 7-7 (SH-D ) 01 0.61 0.50 0.80 0.24
EN EJEC-C , ENTRE 7-7 Y 8-8 (CAM. DAMAS) 01 1.55 0.50 0.80 0.62

Cimientos Corridos 1:8 + 30% P.G.(muro de soga) 11.53


TRANSVERSALES
EN EJE 1-1 Y 2-2, ENTRE A-A Y B-B ( INFORMES ) 01 2.40 0.40 0.60 0.58
EN EJE 2-2, ENTRE A-A Y B-B ( INFORMES ) 01 0.30 0.40 0.60 0.07
EN EJE 2-2 Y 3-3, ENTRE A-A Y B-B ( SSHH. ) 01 1.90 0.40 0.60 0.46
EN EJE 3-3, ENTRE A-A Y B-B 01 4.42 0.40 0.60 1.06
EN EJE 5-5 ENTRE B-B Y C-C ( ESCENARIO ) 01 1.55 0.40 0.60 0.37
EN EJE 7-7 ENTRE B-B Y B!-B! ( PRE ESCENARIO ) 01 2.20 0.40 0.60 0.53
EN EJE 7-7 ENTRE B!-B! Y C-C ( PRE ESCENARIO ) 01 0.75 0.40 0.60 0.18
EN EJE 7-7 Y 8-8, ENTRE B-B Y B!-B! ( SH-V ) 01 2.00 0.40 0.60 0.48
EN EJE 7-7 Y 8-8, ENTRE B!-B! Y C-C ( CAM. DAMAS ) 01 0.92 0.40 0.60 0.22
LONGITUDINAL
EN EJE A-A Y B-B ENTRE 1-1 Y 2-2 ( INFORMES ) 01 1.55 0.40 0.60 0.37
EN EJE B-B ENTRE 1-1 Y 2-2 ( HALL ) 01 2.15 0.40 0.60 0.52
EN EJE A-A Y B-B ENTRE 2-2 Y 3-3 (SH-VARONES ) 01 4.05 0.40 0.60 0.97
EN EJE A-A Y B-B ENTRE 2-2 Y 3-3 (SH-DAMAS ) 01 6.15 0.40 0.60 1.48
EN EJE B-B ENTRE 2-2 Y 3-3 (AUDITORIUM ) 01 2.70 0.40 0.60 0.65
EN EJE B-B ENTRE 3-3 Y 4-4 (AUDITORIUM ) 01 2.95 0.40 0.60 0.71
EN EJE B-B ENTRE 4-4 Y 5-5 (AUDITORIUM ) 01 3.36 0.40 0.60 0.81
EN EJE B' Y B-B ENTRE 5-5 Y 7-7 (PRE ESCENARIO ) 01 0.70 0.40 0.60 0.17
EN EJE C-C Y B' ENTER 6-6 Y 7-7 ( SH-D ) 01 1.60 0.40 0.60 0.38
EN EJE B' Y B-B ENTRE 7-7 Y 8-8 ( SH V+ CAM. VARONES ) 01 3.15 0.40 0.60 0.76
EN EJE B' Y B-B ENTRE 7-7 Y 8-8 ( SH V ) 01 1.05 0.40 0.60 0.25
EN EJE B' ENTRE 7-7 Y 8-8 ( SH V+ CAM. VARONES ) 01 2.18 0.40 0.60 0.52

01.03.02 Solado para Zapatas


Solado de concreto 61.19 M2
Z-1(2.85 X 2.40 ) 02 2.85 2.40 13.68
Z-2 (2.30 X 1.90 ) 06 2.30 1.90 26.22
Z-3 (2.00 X 1.60 ) 05 2.00 1.60 16.00
Z-4 (0.25 X 0.25 ) 01 0.90 0.90 0.81
Z-5 (0.25 X 0.25 ) 06 0.80 0.80 3.84
ZAPATA ESCALERA 01 1.60 0.40 0.64
# DIMENSIONES METRADO
PART. DESCRIPCION VECES
UNID.
LARGO ANCHO ALTO PARCIAL S.TOTAL TOTAL

01.03.03 Sobrecimientos 6.19 M3


01.03.04 Concreto de sobrecimiento 1:8 (ch)+25%(m. cabeza) 3.80
TRANSVERSALES
EN EJE 1-1 , ENTRE B - C ( AUDITORIUM ) 01 7.70 0.25 0.30 0.58
EN EJE 1-1 Y 2-2, ENTRE A-A Y B-B (INFORMES) 01 5.99 0.25 0.30 0.45
EN EJE 8-8, ENTRE B' y C-C ( CAMERINO DAMAS) 01 2.32 0.25 0.30 0.17
EN EJE 8-8, ENTRE B-B Y B' ( CAMERINO VARONES ) 01 2.92 0.25 0.30 0.22
LONGITUDINAL
EN EJE A-A , ENTRE 1-1 ( RETIRO ) 01 1.00 0.25 0.30 0.08
EN EJE A-A , ENTRE 1-2 ( INFORMES ) 01 4.83 0.25 0.30 0.36
EN EJE A-A , ENTRE 2-3 ( SSHH. VARONES ) 01 4.83 0.25 0.30 0.36
EN EJE 1-1 Y 2-2, ENTRE A-A Y B-B (HALL) 01 0.90 0.25 0.30 0.07
EN EJEC-C , ENTRE 1-1 Y 2-2 (AUDITORIUM) 01 2.30 0.25 0.30 0.17
EN EJEC-C , ENTRE 2-2 Y 3-3 (AUDITORIUM) 01 4.80 0.25 0.30 0.36
EN EJEC-C , ENTRE 3-3 Y 4-4 (AUDITORIUM) 01 4.80 0.25 0.30 0.36
EN EJEC-C , ENTRE 4-4 Y 5-5 (AUDITORIUM) 01 4.80 0.25 0.30 0.36
EN EJEC-C , ENTRE 5-5 Y 7-7 (SH-D ) 01 1.24 0.25 0.30 0.09
EN EJEC-C , ENTRE 7-7 Y 8-8 (CAM. DAMAS) 01 2.26 0.25 0.30 0.17

Concreto de sobrecimiento 1:8 (ch)+25%(m.soga) 2.39


TRANSVERSALES
EN EJE 1-1 Y 2-2, ENTRE A-A Y B-B ( INFORMES ) 01 2.05 0.15 0.30 0.09
EN EJE 2-2, ENTRE A-A Y B-B ( INFORMES ) 01 1.85 0.15 0.30 0.08
EN EJE 2-2 Y 3-3, ENTRE A-A Y B-B ( SSHH. ) 01 1.10 0.15 0.30 0.05
EN EJE 3-3, ENTRE A-A Y B-B 01 5.76 0.15 0.30 0.26
EN EJE 5-5 ENTRE B-B Y C-C ( ESCENARIO ) 01 2.67 0.15 0.30 0.12
EN EJE 7-7 ENTRE B-B Y B!-B! ( PRE ESCENARIO ) 01 1.95 0.15 0.30 0.09
EN EJE 7-7 ENTRE B!-B! Y C-C ( PRE ESCENARIO ) 01 0.33 0.15 0.30 0.01
EN EJE 7-7 Y 8-8, ENTRE B-B Y B!-B! ( SH-V ) 01 1.35 0.15 0.30 0.06
EN EJE 7-7 Y 8-8, ENTRE B!-B! Y C-C ( CAM. DAMAS ) 01 0.35 0.15 0.30 0.02
LONGITUDINAL
EN EJE A-A Y B-B ENTRE 1-1 Y 2-2 ( INFORMES ) 01 1.05 0.15 0.30 0.05
EN EJE B-B ENTRE 1-1 Y 2-2 ( HALL ) 01 4.80 0.15 0.30 0.22
EN EJE A-A Y B-B ENTRE 2-2 Y 3-3 (SH-VARONES ) 01 4.05 0.15 0.30 0.18
EN EJE A-A Y B-B ENTRE 2-2 Y 3-3 (SH-DAMAS ) 01 5.10 0.15 0.30 0.23
EN EJE B-B ENTRE 2-2 Y 3-3 (AUDITORIUM ) 01 2.30 0.15 0.30 0.10
EN EJE B-B ENTRE 3-3 Y 4-4 (AUDITORIUM ) 01 3.60 0.15 0.30 0.16
EN EJE B-B ENTRE 4-4 Y 5-5 (AUDITORIUM ) 01 4.80 0.15 0.30 0.22
EN EJE B' Y B-B ENTRE 5-5 Y 7-7 (PRE ESCENARIO ) 01 0.35 0.15 0.30 0.02
EN EJE C-C Y B' ENTER 6-6 Y 7-7 ( SH-D ) 01 1.80 0.15 0.30 0.08
EN EJE B' Y B-B ENTRE 7-7 Y 8-8 ( SH V+ CAM. VARONES ) 01 3.90 0.15 0.30 0.18
EN EJE B' Y B-B ENTRE 7-7 Y 8-8 ( SH V ) 01 0.90 0.15 0.30 0.04
EN EJE B' ENTRE 7-7 Y 8-8 ( SH V+ CAM. VARONES ) 01 3.04 0.15 0.30 0.14

01.03.05 Encofrado y desencofrado sobrecimiento 62.27 M2


Encofrado y Desencofrado (m. cabeza) 30.41
TRANSVERSALES
EN EJE 1-1 , ENTRE B - C ( AUDITORIUM ) 02 7.70 0.30 4.62
EN EJE 1-1 Y 2-2, ENTRE A-A Y B-B (INFORMES) 02 5.99 0.30 3.59
EN EJE 8-8, ENTRE B' y C-C ( CAMERINO DAMAS) 02 2.32 0.30 1.39
EN EJE 8-8, ENTRE B-B Y B' ( CAMERINO VARONES ) 02 2.92 0.30 1.75
LONGITUDINAL
EN EJE A-A , ENTRE 1-1 ( RETIRO ) 02 1.00 0.30 0.60
EN EJE A-A , ENTRE 1-2 ( INFORMES ) 02 4.83 0.30 2.90
EN EJE A-A , ENTRE 2-3 ( SSHH. VARONES ) 02 4.83 0.30 2.90
EN EJE 1-1 Y 2-2, ENTRE A-A Y B-B (HALL) 02 0.90 0.30 0.54
EN EJEC-C , ENTRE 1-1 Y 2-2 (AUDITORIUM) 02 2.30 0.30 1.38
EN EJEC-C , ENTRE 2-2 Y 3-3 (AUDITORIUM) 02 4.80 0.30 2.88
EN EJEC-C , ENTRE 3-3 Y 4-4 (AUDITORIUM) 02 4.80 0.30 2.88
EN EJEC-C , ENTRE 4-4 Y 5-5 (AUDITORIUM) 02 4.80 0.30 2.88
EN EJEC-C , ENTRE 5-5 Y 7-7 (SH-D ) 02 1.24 0.30 0.74
EN EJEC-C , ENTRE 7-7 Y 8-8 (CAM. DAMAS) 02 2.26 0.30 1.36
# DIMENSIONES METRADO
PART. DESCRIPCION VECES
UNID.
LARGO ANCHO ALTO PARCIAL S.TOTAL TOTAL

Encofrado y Desencofrado (m. soga) 31.86


TRANSVERSALES
EN EJE 1-1 Y 2-2, ENTRE A-A Y B-B ( INFORMES ) 02 2.05 0.30 1.23
EN EJE 2-2, ENTRE A-A Y B-B ( INFORMES ) 02 1.85 0.30 1.11
EN EJE 2-2 Y 3-3, ENTRE A-A Y B-B ( SSHH. ) 02 1.10 0.30 0.66
EN EJE 3-3, ENTRE A-A Y B-B 02 5.76 0.30 3.46
EN EJE 5-5 ENTRE B-B Y C-C ( ESCENARIO ) 02 2.67 0.30 1.60
EN EJE 7-7 ENTRE B-B Y B!-B! ( PRE ESCENARIO ) 02 1.95 0.30 1.17
EN EJE 7-7 ENTRE B!-B! Y C-C ( PRE ESCENARIO ) 02 0.33 0.30 0.20
EN EJE 7-7 Y 8-8, ENTRE B-B Y B!-B! ( SH-V ) 02 1.35 0.30 0.81
EN EJE 7-7 Y 8-8, ENTRE B!-B! Y C-C ( CAM. DAMAS ) 02 0.35 0.30 0.21
LONGITUDINAL
EN EJE A-A Y B-B ENTRE 1-1 Y 2-2 ( INFORMES ) 02 1.05 0.30 0.63
EN EJE B-B ENTRE 1-1 Y 2-2 ( HALL ) 02 4.80 0.30 2.88
EN EJE A-A Y B-B ENTRE 2-2 Y 3-3 (SH-VARONES ) 02 4.05 0.30 2.43
EN EJE A-A Y B-B ENTRE 2-2 Y 3-3 (SH-DAMAS ) 02 5.10 0.30 3.06
EN EJE B-B ENTRE 2-2 Y 3-3 (AUDITORIUM ) 02 2.30 0.30 1.38
EN EJE B-B ENTRE 3-3 Y 4-4 (AUDITORIUM ) 02 3.60 0.30 2.16
EN EJE B-B ENTRE 4-4 Y 5-5 (AUDITORIUM ) 02 4.80 0.30 2.88
EN EJE B' Y B-B ENTRE 5-5 Y 7-7 (PRE ESCENARIO ) 02 0.35 0.30 0.21
EN EJE C-C Y B' ENTER 6-6 Y 7-7 ( SH-D ) 02 1.80 0.30 1.08
EN EJE B' Y B-B ENTRE 7-7 Y 8-8 ( SH V+ CAM. VARONES ) 02 3.90 0.30 2.34
EN EJE B' Y B-B ENTRE 7-7 Y 8-8 ( SH V ) 02 0.90 0.30 0.54
EN EJE B' ENTRE 7-7 Y 8-8 ( SH V+ CAM. VARONES ) 02 3.04 0.30 1.82

01.03.06 Falsos pisos


Falso piso 4" c/mezcla 1:8 C:H 977.48 M2
Shh-v 01 4.95 1.86 9.21
Shh-d 01 3.90 1.75 6.83
Hall Sh. 01 1.95 1.75 3.41
Informes 01 2.19 1.05 2.30
01 4.24 2.30 9.75
Hall Principal 01 3.75 3.70 13.88
01 4.95 2.20 10.89
Auditorium 01 15.35 8.40 128.94
Escenario 01 8.50 4.95 42.08
Pre Escenario 01 4.33 169.00 731.77
Camerino Damas 01 2.64 2.28 6.02
01 1.23 0.46 0.57
Sh-d(camerinos) 01 1.80 0.90 1.62
Camerino Varones 01 2.95 2.52 7.43
01 1.20 0.90 1.08
Sh-v(camerinos) 01 1.90 0.90 1.71

01.04 CONCRETO ARMADO 36.71 M3


Zapatas
Concreto F'C = 210 kg/cm2 en Zapatas
Z-1(2.85 X 2.40 ) 02 2.85 2.40 0.60 8.21
Z-2 (2.30 X 1.90 ) 06 2.30 1.90 0.60 15.73
Z-3 (2.00 X 1.60 ) 05 2.00 1.60 0.60 9.60
Z-4 (0.25 X 0.25 ) 01 0.90 0.90 0.60 0.49
Z-5 (0.25 X 0.25 ) 06 0.80 0.80 0.60 2.30
ZAPATA ESCALERA 01 1.60 0.40 0.60 0.38

01.04.02 Columnas
01.04.02.01 Concreto F'C = 210 kg/cm2 en columnas 10.00 M3
C-1(0.60 X 0.30 ) 02 0.60 0.30 3.60 1.30
C-2(0.60 X 0.30 ) 06 0.60 0.30 3.60 3.89
C-3(0.60 X 0.30 ) 05 0.60 0.30 3.60 3.24
C-4(0.25 X 0.25 ) 01 0.25 0.25 3.60 0.23
C-5(0.25 X 0.25 ) 06 0.25 0.25 3.60 1.35

01.04.02.02 Encofrado y desencofrado columnas 11.89 M2


# DIMENSIONES METRADO
PART. DESCRIPCION VECES
UNID.
LARGO ANCHO ALTO PARCIAL S.TOTAL TOTAL

C-1(0.60 X 0.30 ) 02 1.30 0.60 1.56


C-2(0.60 X 0.30 ) 06 1.30 0.60 4.68
C-3(0.60 X 0.30 ) 05 1.30 0.60 3.90
C-4(0.20 X 0.25 ) 01 0.50 0.50 0.25
C-5(0.25 X 0.25 ) 06 0.50 0.50 1.50

01.04.02.03 Acero f'y=4200 kg/cm2. Columnas Cant. N° veces Long. Kg/m Sub Total 408.49 KG
C-1(0.60 X 0.30 )
Fe. Ø3/4" 02 8.00 6.30 2.24 225.79
Fe. Ø5/8" 02 6.00 6.30 1.55 117.18
Estribos Fe. Ø 3/8" 02 30.00 1.95 0.56 65.52

C-2(0.60 X 0.30 )
Fe. Ø3/4" 06 6.00 6.30 2.24 508.03
Fe. Ø5/8" 06 6.00 6.30 1.55 351.54
Estribos Fe. Ø 3/8" 06 30.00 1.95 0.56 196.56

C-3(0.60 X 0.30 )
Fe. Ø3/4" 05 6.00 6.30 2.24 423.36
Fe. Ø5/8" 05 6.00 6.30 1.55 292.95
Estribos Fe. Ø 3/8" 05 30.00 1.95 0.56 163.80

C-4(0.20 X 0.25 )
Fe. Ø1/2" 01 6.00 6.30 0.99 37.42
Estribos Fe. Ø 3/8" 01 30.00 1.95 0.56 32.76

C-5(0.25 X 0.25 )
Fe. Ø1/2" 06 6.00 6.30 0.99 224.53
Estribos Fe. Ø 3/8" 06 30.00 1.95 0.56 196.56

01.04.03 Vigas
01.04.03.01 Concreto F'C = 210 kg/cm2 vigas 16.58 M3
VP-101- ( 0.30 X 0.60) 01 15.58 0.30 0.60 2.80
VP-102- ( 0.30 X 0.60) 02 15.04 0.30 0.60 5.41
VP-103- ( 0.30 X 0.60) 02 7.60 0.30 0.60 2.74
VS-101- ( 0.25 X 0.40) 01 11.36 0.25 0.40 1.14
VS-102- ( 0.25 X 0.40) 01 20.05 0.25 0.40 2.01
VS-103- ( 0.25 X 0.40) 01 20.55 0.25 0.40 2.06
VA-101- ( 0.25 X 0.20) 01 4.80 0.25 0.20 0.24
VA-102- ( 0.25 X 0.20) 01 3.74 0.25 0.20 0.19

01.04.03.02 Encofrado y desencofrado vigas 108.05 M2


VP-101- ( 0.30 X 0.60) 01 15.58 1.10 17.14
VP-102- ( 0.30 X 0.60) 02 15.04 1.10 33.09
VP-103- ( 0.30 X 0.60) 02 7.60 1.10 16.72
VS-101- ( 0.25 X 0.40) 01 11.36 0.75 8.52
VS-102- ( 0.25 X 0.40) 01 20.05 0.75 15.04
VS-103- ( 0.25 X 0.40) 01 20.55 0.75 15.41
VA-101- ( 0.25 X 0.20) 01 4.80 0.25 1.20
VA-102- ( 0.25 X 0.20) 01 3.74 0.25 0.94

01.04.03.03 Acero f'y=4200 kg/cm2. Cant. N° veces Long. Kg/m Sub Total 303.72 KG

VP-101- ( 0.30 X 0.60)


Fe. Ø1/2" 01 4.00 10.40 0.99 41.18
Refuerzo Fe. Ø1/2" 01 1.00 8.10 0.99 8.02
Estribos Fe. Ø 1/4" 01 40.00 0.90 0.39 14.04

VP-102- ( 0.30 X 0.60)


Fe. Ø1/2" 02 4.00 17.85 0.90 128.52
Refuerzo Fe. Ø1/2" 02 1.00 12.57 0.90 22.63
Estribos Fe. Ø 1/4" 01 72.00 0.90 0.39 25.27
# DIMENSIONES METRADO
PART. DESCRIPCION VECES
UNID.
LARGO ANCHO ALTO PARCIAL S.TOTAL TOTAL

VP-103- ( 0.30 X 0.60)


Fe. Ø1/2" 02 4.00 6.05 0.99 47.92
Estribos Fe. Ø 1/4" 01 46.00 0.90 0.39 16.15

VS-101- ( 0.25 X 0.40)

VS-103- ( 0.25 X 0.40)

VA-101- ( 0.25 X 0.20)

VA-102- ( 0.25 X 0.20)

01.04.04 Losa Aligerada


01.04.04.01 Concreto F'C = 210 kg/cm2 losa aligerada 21.42 M3
Paño a 01 8.40 1.00 0.08 0.67
Paño b 01 3.46 0.80 0.08 0.22
Paño c 02 4.80 1.15 0.08 0.88
Paño d 01 3.55 0.80 0.08 0.23
Paño e 01 19.20 8.40 0.08 12.90
Paño f 01 4.80 3.40 0.08 1.31
Paño g 01 2.20 0.70 0.08 0.12
Paño h 01 3.75 1.30 0.08 0.39
Paño i 01 8.38 4.80 0.08 3.22
Paño j 01 3.20 0.85 0.08 0.22
Paño k 01 8.57 0.90 0.08 0.62
Paño l 01 3.70 1.20 0.08 0.36
Paño m 01 4.00 0.90 0.08 0.29

01.04.04.02 Encofrado y desencofrado losa aligerada 267.76 M2


Paño a 01 8.40 1.00 8.40
Paño b 01 3.46 0.80 2.77
Paño c 02 4.80 1.15 11.04
Paño d 01 3.55 0.80 2.84
Paño e 01 19.20 8.40 161.28
Paño f 01 4.80 3.40 16.32
Paño g 01 2.20 0.70 1.54
Paño h 01 3.75 1.30 4.88
Paño i 01 8.38 4.80 40.22
Paño j 01 3.20 0.85 2.72
Paño k 01 8.57 0.90 7.71
Paño l 01 3.70 1.20 4.44
Paño m 01 4.00 0.90 3.60

01.04.04.03 Acero f'y=4200 kg/cm2. Cant. N° veces Long. Kg/m Sub Total 2,401.56 KG

Paño A
Fe. Ø1/2" 01 10.00 6.05 0.99 59.90
Refuerzo Fe. Ø3/8" 01 10.00 2.80 0.56 15.68

Paño B
Fe. Ø1/2" 01 9.00 2.90 0.99 25.84
Refuerzo Fe. Ø3/8" 01 9.00 1.80 0.56 9.07

Volado
Fe. Ø1/2" 01 2.00 6.05 0.99 11.98
Refuerzo Fe. Ø3/8" 01 2.00 2.80 0.56 3.14

01.04.04.04 Ladrillo hueco 30 x 30 x 15 cm #REF! u


Paño a 01 8.40 1.00 8.50 71.40
# DIMENSIONES METRADO
PART. DESCRIPCION VECES
UNID.
LARGO ANCHO ALTO PARCIAL S.TOTAL TOTAL

Paño b 01 3.46 0.80 8.50 23.53


Paño c 02 4.80 1.15 8.50 93.84
Paño d 01 3.55 0.80 8.50 24.14
Paño e 01 19.20 8.40 8.50 1,370.88
Paño f 01 4.80 3.40 8.50 138.72
Paño g 01 2.20 0.70 8.50 13.09
Paño h 01 3.75 1.30 8.50 41.44
Paño i 01 8.38 4.80 8.50 341.90
Paño j 01 3.20 0.85 8.50 23.12
Paño k 01 8.57 0.90 8.50 65.56
Paño l 01 3.70 1.20 8.50 37.74
Paño m 01 4.00 0.90 8.50 30.60

01.04.05 ESCALERA
01.04.05.01 Concreto F'C = 175 kg/cm2 losa aligerada 1.20 M3
Tramo 01
Losa 01 2.55 0.90 0.15 0.34
Peldaños 07 0.90 0.25 0.09 0.14

Tramo 02
Losa 01 3.95 0.90 0.15 0.53
Peldaños 09 0.90 0.25 0.09 0.18

01.04.05.02 Encofrado y desencofrado Escalera 8.44 M2

Tramo 01
Losa 01 2.55 0.90 2.30
Peldaños 07 0.90 0.18 1.13

Tramo 02
Losa 01 3.95 0.90 3.56
Peldaños 09 0.90 0.18 1.46

01.04.05.03 Acero f'y=4200 kg/cm2. Cant. N° veces Long. Kg/m Sub Total 80.19 KG

Tramo 01
Fe. Ø1/2" 01 5.00 4.80 0.99 23.76
Refuerzo Fe. Ø3/8" 01 13.00 0.80 0.56 5.82

Tramo 02
Fe. Ø1/2" 01 5.00 6.15 0.99 30.44
Refuerzo Fe. Ø3/8" 01 20.00 1.80 0.56 20.16
# DIMENSIONES METRADO
PART. DESCRIPCION VECES
UNID.
LARGO ANCHO ALTO PARCIAL S.TOTAL TOTAL
METRADOS DE OBRA

INSTALACIONES ELECTRICAS
OBRA: C.E.I JERUSALEN
MUNICIPALIDAD DISTRITAL DE ACOBAMBILLA
DISTRITO: Acobambilla PROVINCIA: Huancavelica DEPARTAMENTO: Huancavelica

# DIMENSIONES METRADO
PART. DESCRIPCION VECES
UNID.
LARGO ANCHO ALTO PARCIAL TOTAL

03.00 INSTALACIONES ELECTRICAS


03.01 SALIDA DE PUNTO DE LUZ
03.01.01 Salida de techo (centros) 12 12.00 12.00 pto.
03.01.02 Salida para Spot light con PVC 02 2.00 2.00 pto.
03.01.03 Salida p´ tomacorriente simple 19 19.00 19.00 pto.

03.02 CANALIZACIONES Y/O TUBERIAS


03.02.01 Tuberia PVC SAP (elect.) D= 1/2" 94.58 94.58 94.58 ml

03.03 CONDUCTORES Y/O CABLES


03.03.01 Conductor electrico Cu TW 2.5 mm².(14 ) 56.78 56.78 56.78 ml
03.03.02 Conductor eléctrico Cu TW 4 mm².(12) 37.80 37.80 37.80 ml

03.04 TABLEROS Y CUCHILLAS


03.04.01 Tablero General Metálico 01 1.00 1.00 unid.
03.04.02 Tab. de Dist. caja metálica con 12 polos 02 2.00 2.00 unid.
03.04.03 Llave interruptor de cuchillas 02 2.00 2.00 unid.
03.05 OTRAS INSTALACIONES
03.05.01 Pozo a tierra 00 0.00 0.00 unid.
METRADOS DE OBRA

ARQUITECTURA
OBRA: C.E.I JERUSALEN
MUNICIPALIDAD DISTRITAL DE ACOBAMBILLA
DISTRITO: Acobambilla PROVINCIA: Huancavelica DEPARTAMENTO: Huancavelica

# DIMENSIONES METRADO
PART. DESCRIPCION VECES
UNID.
LARGO ANCHO ALTO PARCIAL S.TOTAL TOTAL

02.00 ARQUITECTURA
02.01 ALBAÑILERIA
Muro de ladrillo de arcilla K.K.

02.01.01 Muro de ladrillo K.K. de soga 104.46 m².


Primera planta
Longitudinales
EJE C-C TRAMO 1-2 01 3.55 2.60 9.23 9.23
EJE B-B ENTRE 1-1 Y 2-2 01 1.60 2.60 4.16
menos v-2 01 0.60 0.50 0.30 3.86

Transversales
EJE 1-1 TRAMO B-C 01 3.01 2.60 7.83 7.83
ENTRE EJE 1-2 Y TRAMO B-C 01 0.90 2.60 2.34 2.34
ENTRE EJE 1-2 Y TRAMO B-C 01 0.30 2.60 0.78 0.78
EJE 2-2 TRAMO A-B 01 1.40 2.60 3.64 3.64
EJE 2-2 TRAMO B-C 01 2.00 2.60 5.20
menos v-1 01 2.00 1.60 3.20 2.00

Segunda planta

Longitudinales
EJE A-A TRAMO 1-2 01 3.60 2.40 8.64 8.64
EJE A-A TRAMO 2-3 01 4.20 2.40 10.08 10.08
EJE B-B TRAMO 1-2 01 3.45 2.40 8.28
menos v-6 01 1.50 1.40 2.10 6.18

EJE B-B TRAMO 2-3 01 2.60 2.40 6.24 6.24


EJE C-C TRAMO 2-3 01 4.70 2.40 11.28 11.28
EJE 2-2 TRAMO A-B sh. 01 1.75 2.40 4.20 4.20

Transversales
EJE 1-1 TRAMO A-B 01 2.40 2.40 5.76 5.76
EJE 2-2 TRAMO B-C 01 2.00 2.40 4.80
menos v-5 01 2.00 1.40 2.80 2.00

EJE 3-3 TRAMO A-B 01 2.65 2.40 6.36


menos v-4 01 1.00 1.40 1.40 4.96

EJE 3-3 TRAMO B-C 01 3.40 2.40 8.16


menos v-3 01 2.00 1.40 2.80 5.36

TRAMO A-B y 1-2 -sh. 01 1.60 2.40 3.84 3.84


TRAMO A-B y 2-3 -cocina 01 2.60 2.40 6.24 6.24

02.01.02 Muro de ladrillo K.K. de Cabeza 52.42 m².


Primera planta
Longitudinales
EJE A-A TRAMO 1-2 01 3.60 2.60 9.36 9.36
EJE A-A TRAMO 2-3 01 3.90 2.60 10.14 10.14
EJE B-B TRAMO 1-2 01 2.46 2.60 6.40 6.40
EJE B-B TRAMO 2-3 01 3.90 2.60 10.14 10.14
EJE C-C TRAMO 2-3 01 3.90 2.60 10.14 10.14
Transversales
EJE 1-1 TRAMO A-B 01 2.40 2.60 6.24 6.24
# DIMENSIONES METRADO
PART. DESCRIPCION VECES
UNID.
LARGO ANCHO ALTO PARCIAL S.TOTAL TOTAL

01.02 Tarrajeo en muros exteriores


01.02.01 Tarrajeo en muros exteriores frotachado #REF! m².

01.02.03 Tarrajeo de Vigas


Tarrajeo en vigas C:A 1:5 con cintas E=15mm 0.00 m².

01.02.04 Tarrajeo rayado


Tarrajeo rayado #REF! m².

01.02.05 Vestidura de derrames


Vestidura de derrames ancho 0,15 cm 0.00 m.

01.03 CIELORASOS
01.03.01 Cieloraso de Triplay
0.00 0.00 m².

01.04 PISOS Y PAVIMENTOS


01.04.01 Cemento pulido de color 0.00 m².

01.04.02 loseta de 30 X 30 0.00 m².

01.05 ZOCALOS
01.05.01 Zocalo Exterior de cemneto pulido
0.00 m².
01.05.02 Zocalo Interior de cemneto pulido 0.00 m².

01.05.03 Zocalo de ceramica Celima 30x30 Cm. #REF! m2

01.06 CUBIERTAS

01.06.01 Tijeral Principal 0.00 pz


# DIMENSIONES METRADO
PART. DESCRIPCION VECES
UNID.
LARGO ANCHO ALTO PARCIAL S.TOTAL TOTAL

01.06.03 Correas de 2"x 3" 0.00 m

01.06.04 Cobertura de Calamina


0.00 m².

01.06.05 Canaleta
0.00 m

01.07 CARPINTERÍA DE MADERA


01.07.01 Puerta de madera apanelada 0.00 m².

01.07.02 Ventanas de Madera 0.00 m².

01.08 CARPINTERÍA METÁLICA


01.08.01 Perfiles( Tabiqueria Metalica) 0.00 m².

01.09 CERRAJERÍA
01.09.01 Bisagras
Bisagra capuchina de fierro de 3" x 3" 0.00 unid

01.09.02 Cerraduras
Cerradura puerta de sobre poner de 2 0.00 unid
golpes, llave exterior.

01.09.03 Cerradura puerta de Baño


con seguro interno 0.00 unid

01.10 VIDRIOS, CRISTALES Y SIMILARES


01.10.01 Cristal Triple 0.00 p².

01.11 PINTURA
01.11.01 Pintura latex en muros exteriores 2 manos 0.00 m².

01.11.02 Pintura latex en muros interiores - 2 manos 0.00 m².

01.11.03 Pintura en vigas 0.00 m².

01.11.04 Pintura en derrames ancho 0,15 cm 0.00 m.


# DIMENSIONES METRADO
PART. DESCRIPCION VECES
UNID.
LARGO ANCHO ALTO PARCIAL S.TOTAL TOTAL

Pintura en carpinteria de madera con barniz


01.11.05 Puertas 0.00 m².

01.11.06 Ventanas de madera 0.00 m².

01.12 Aparatos
01.12.01 Inodoros 00 0.00 Pza
01.12.02 Lavtorios 00 0.00 Pza
METRADOS DE OBRA

INSTALACIONES SANITARIAS
OBRA: C.E.I JERUSALEN
MUNICIPALIDAD DISTRITAL DE ACOBAMBILLA
DISTRITO: Acobambilla PROVINCIA: Huancavelica DEPARTAMENTO: Huancavelica

# DIMENSIONES METRADO
PART. DESCRIPCION VECES
UNID.
LARGO ANCHO ALTO PARCIAL TOTAL

04.00 INSTALACIONES SANITARIAS


SISTEMA DE DESAGUE
04.01. PUNTOS DE SALIDA DE DESAGUE
04.01.01 Salida de desague PVC SAL Ø2" 05 5.00 5.00 pto.
04.01.02 Salida de desague PVC SAL Ø4" 02 2.00 2.00 pto.
04.01.03 Salida de ventilación PVC Ø2" 02 2.00 2.00 pto.
04.02 Redes de Distribudción
04.02.01 Tuberia PVC SAL p/desague 2" 01 17.60 17.60 17.60 ml
04.02.02 Tuberia PVC SAL p/desague 4" 01 15.15 15.15 15.15 ml
04.03 Accesorios de redes
04.03.01 Codo PVC SAL 2 x 45° 03 3.00 3.00 pza.
04.03.02 Codo PVC SAL 2 x 90° 12 12.00 12.00 pza.
04.03.03 Yee PVC SAL 2" 01 1.00 1.00 pza.
04.03.04 Yee PVC SAL 4" a 2" 08 8.00 8.00 pza.
04.03.05 Codo 4" 01 1.00 1.00 pza.
04.03.06 Tee 4" 02 2.00 2.00 pza.

04.04 Aditamentos varios


04.04.01 Sumidero de bronce de Ø2" 03 3.00 3.00 pza.
04.04.02 Registro de bronce roscado de piso Ø4" 02 2.00 2.00 pza.
04.04.03 Sombrero de ventilación 2" PVC 02 2.00 2.00 pza.
04.04.04 Caja de Registro alb de 12" x 24" tal Fo. Fdo. 01 1.00 1.00 pza.

04.05 SISTEMA DE AGUA FRIA Y CONTRAINCENDIO


04.06 Salida de agua fría
04.06.01 Salida de agua fría PVC SAP Ø ½" 05 5.00 5.00 pto.
04.07 Redes de Distribución
04.07.01 Tuberia PVC SAP Clase 10 R Ø ½" 01 17.55 17.55 17.55 ml
04.08 Accesorios de redes
04.08.01 Codo PVC SAP Ø ½" x 90° 14 14.00 14.00 pza.
04.08.02 Tee PVC SAP Ø ½" 05 5.00 5.00 pza.
04.09 Llaves, válvulas
04.09.01 Válvula de compuerta de bronce Ø ½" 03 3.00 3.00 pza.
RESUMEN DE METRADOS
OBRA: C.E.I JERUSALEN

PART. DESCRIPCION UNID.

01.00 Fe. Ø1/2" 87.00 U


02.00 Fe. Ø3/8" 11.00 U
03.00 Estribos Fe. Ø 1/4" 173.36 KG
04.00 LADRILLO PASTELERO 300.00 U
05.00 LADRILLO CORRIENTE 11,200.00 U
06.00 CEMENTO 136.00 BLS
01.02
01.02.01 m².

01.02.02
m².