CALCULO DE LOS METRADOS RECONOCIDOS

MEJORAMIENTO DEL CAMINO VECINAL MALECON RIO AJA DEL DISTRITO DE NASCA - PROVINCIA DE NASCA -
FECHA:
DEPARTAMENTO DE ICA

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE NASCA


CONTRATIST : CONSORCIO NAZCA
RESIDENTE : ING. ELVER MORAN PURIZAGA - CIP Nº 54746
SUPERVISOR : ING. JOSE LUIS VENTURA QUIROZ - CIP Nº 80609

FECHA : NASCA, 29 DE FEBRERO DEL 2024

MEDIDAS
Nº DE
PARTIDA N° ESPECIFICACIONES UND. PARCIAL TOTAL
VECES LARGO ANCHO ALTURA

01 OBRAS GENERALES
01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m. und. 1.00 1.00 1.00

01.01.02 CASETA DE MADERA PREFABRICADA P/OFICINAS m2. 24.00


OFICINA DE RESIDENTE 1.00 3.73 3.75 14.00
SEGURIDAD Y SALUD 1.00 2.50 4.00 10.00

01.01.03 CASETA DE MADERA PREFABRICADA P/GUARDIANIA m2. 45.00


GUARDIANIA 1.00 15.00 3.00 45.00

01.01.04 CASETA DE MADERA PREFABRICADA P/ALMACEN m2. 32.00


ALMACEN 1.00 6.00 5.33 32.00

1 Mes Dias Trab.


01.01.05 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL mes 3.00 29 13 0.45 0.45

1 Mes Dias Trab.


01.01.06 LETRINA SANITARIA PORTATIL mes 3.00 29 13 0.45 0.45

01.02 OBRAS PRELIMINARES

01.02.01 TRAZO, NIVELACION Y REPLANTEO PERMANENTE m2 4063.50


CARPETA ASFALTICA EN CALIENTE, VEREDAS, SARDINELES Y MUROS m2 8127.00 0.50 4063.50

MOVILIZACION Y DESMOVILIZACIÓN DE EQUIPOS Y/O


01.02.02 Glb. 1.00 0.50 0.50
MAQUINARIA
HOJA DE METRADOS - ESTRUCTURAS

#REF!

FECHA: #REF!
SUB.PTO.: #REF!
METRADO : ESTRUCTURAS
N° DE Ancho Alto SUB-
ITEM DESCRIPCION UND Largo (m) PARCIAL TOTAL
VECES (m) (m) TOTAL
01 ESTRUCTURAS
01.01 TRABAJOS PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL m2 1 9.85 9.85 97.02 97.02 97.02
01.01.02 TRAZO, NIVELACION Y REPLANTEO m2 1 9.85 9.85 97.02 97.02 97.02

01.02 MOVIMIENTO DE TIERRAS


01.02.01 EXCAVACION DE ZANJA m3 68.09
CIMIENTO CORRIDO 1
EJE 2-2 ENTRE A-E 1 8.98 0.60 1.60 8.62 8.62
EJE 3-3 ENTRE A-E 1 8.98 0.60 1.60 8.62 8.62
EJE 4-4 ENTRE A-E 1 9.65 0.60 1.60 9.26 9.26
EJE B-B ENTRE 2-3 1 3.05 0.60 1.60 2.93 2.93
EJE B-B ENTRE 3-4 1 3.50 0.60 1.60 3.36 3.36
CIMIENTO CORRIDO 2
EJE 1-1 ENTRE A-A3 1 2.45 0.50 1.60 1.96 1.96
EJE 1-1 ENTRE B3-C 1 2.45 0.50 1.60 1.96 1.96
EJE A-A ENTRE 3-4 1 2.25 0.50 1.60 1.80 1.80
EJE C-C ENTRE 2-3 1 3.05 0.50 1.60 2.44 2.44
CIMIENTO CORRIDO 3
EJE A-A ENTRE 1-2 1 1.40 0.40 1.60 0.90 0.90
EJE A3 ENTRE 1-2 1 1.40 0.40 1.60 0.90 0.90
EJE B3 ENTRE 1-2 1 1.40 0.40 1.60 0.90 0.90
EJE C-C ENTRE 1-2 1 1.40 0.40 1.60 0.90 0.90
CIMIENTO CORRIDO 4
EJE E-E ENTRE 2-4 1 8.35 0.70 2.23 13.01 13.01
CIMIENTO CORRIDO 5
EJE A-A ENTRE 2-4 1 5.50 1.20 1.60 10.56 10.56
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN
01.02.02 m3 17.11
CAPAS DE 0.20M.
CIMIENTO CORRIDO 1
EJE 2-2 ENTRE A-E 1 8.98 0.47 0.40 1.69 1.69
EJE 3-3 ENTRE A-E 1 8.98 0.47 0.40 1.69 1.69
EJE 4-4 ENTRE A-E 1 9.65 0.47 0.40 1.81 1.81
EJE B-B ENTRE 2-3 1 3.05 0.47 0.40 0.57 0.57
EJE B-B ENTRE 3-4 1 3.50 0.47 0.40 0.66 0.66
CIMIENTO CORRIDO 2
EJE 1-1 ENTRE A-A3 1 2.45 0.37 0.40 0.36 0.36
EJE 1-1 ENTRE B3-C 1 2.45 0.37 0.40 0.36 0.36
EJE A-A ENTRE 3-4 1 2.25 0.37 0.40 0.33 0.33
EJE C-C ENTRE 2-3 1 3.05 0.37 0.40 0.45 0.45
CIMIENTO CORRIDO 3
EJE A-A ENTRE 1-2 1 1.40 0.27 0.40 0.15 0.15
EJE A3 ENTRE 1-2 1 1.40 0.27 0.40 0.15 0.15
EJE B3 ENTRE 1-2 1 1.40 0.27 0.40 0.15 0.15
EJE C-C ENTRE 1-2 1 1.40 0.27 0.40 0.15 0.15
CIMIENTO CORRIDO 4
EJE E-E ENTRE 2-4 1 8.35 0.57 1.03 4.88 4.88
CIMIENTO CORRIDO 5
EJE A-A ENTRE 2-4 1 5.50 0.84 0.80 3.70 3.70

01.02.03 RELLENO, NIVELACION Y COMPACTADO C/AFIRMADO e=0.10m m2 84.87


VEREDA EXTERIOR 1 1 2.20 1.80 3.96 3.96
VEREDA EXTERIOR 3 1 2.20 1.80 3.96 3.96
INGRESO A SSHH 1 3.40 1.95 6.63 6.63
SSHH DISCAPACITADOS 1 1.90 3.65 6.94 6.94
VANOS -1 0.90 0.15 0.14 -0.14
SSHH VARONES - AMB. 1 1 3.60 3.50 12.60 12.60
VANOS 1 1.00 0.15 0.15 0.15
SSHH VARONES - AMB. 2 1 5.65 3.95 22.32 22.32
VANOS 1 1.20 0.15 0.18 0.18
SSHH DAMAS - AMB. 1 1 3.75 3.50 13.13 13.13
VANOS 1 1.00 0.15 0.15 0.15
SSHH DAMAS - AMB. 2 1 3.75 3.95 14.81 14.81
VANOS 1 1.20 0.15 0.18 0.18

01.02.04 ACARREO DE MATERIAL EXCEDENTE EN OBRA m3 1.25 63.73 79.66 79.66

01.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 1.25 63.73 79.66 79.66

01.03 OBRAS DE CONCRETO CICLOPEO

01.03.01 SUB-CIMIENTO 1:12+30% P.M. Max 6" m3 13.47


CIMIENTO CORRIDO 1
HOJA DE METRADOS - ESTRUCTURAS

#REF!

FECHA: #REF!
SUB.PTO.: #REF!
METRADO : ESTRUCTURAS
N° DE Ancho Alto SUB-
ITEM DESCRIPCION UND Largo (m) PARCIAL TOTAL
VECES (m) (m) TOTAL
EJE 2-2 ENTRE A-E 1 8.98 0.60 0.40 2.15 2.15
EJE 3-3 ENTRE A-E 1 8.98 0.60 0.40 2.15 2.15
EJE 4-4 ENTRE A-E 1 9.65 0.60 0.40 2.32 2.32
EJE B-B ENTRE 2-3 1 3.05 0.60 0.40 0.73 0.73
EJE B-B ENTRE 3-4 1 3.50 0.60 0.40 0.84 0.84
CIMIENTO CORRIDO 2
EJE 1-1 ENTRE A-A3 1 2.45 0.50 0.40 0.49 0.49
EJE 1-1 ENTRE B3-C 1 2.45 0.50 0.40 0.49 0.49
EJE A-A ENTRE 3-4 1 2.25 0.50 0.40 0.45 0.45
EJE C-C ENTRE 2-3 1 3.05 0.50 0.40 0.61 0.61
CIMIENTO CORRIDO 3
EJE A-A ENTRE 1-2 1 1.40 0.40 0.40 0.22 0.22
EJE A3 ENTRE 1-2 1 1.40 0.40 0.40 0.22 0.22
EJE B3 ENTRE 1-2 1 1.40 0.40 0.40 0.22 0.22
EJE C-C ENTRE 1-2 1 1.40 0.40 0.40 0.22 0.22
CIMIENTO CORRIDO 4
EJE E-E ENTRE 2-4 1 8.35 0.70 0.40 2.34 2.34

01.03.02 CIMIENTO CORRIDO 1:10+30% P.G. Max 8" m3 32.22


CIMIENTO CORRIDO 1
EJE 2-2 ENTRE A-E 1 8.98 0.60 0.80 4.31 4.31
EJE 3-3 ENTRE A-E 1 8.98 0.60 0.80 4.31 4.31
EJE 4-4 ENTRE A-E 1 9.65 0.60 0.80 4.63 4.63
EJE B-B ENTRE 2-3 1 3.05 0.60 0.80 1.46 1.46
EJE B-B ENTRE 3-4 1 3.50 0.60 0.80 1.68 1.68
CIMIENTO CORRIDO 2
EJE 1-1 ENTRE A-A3 1 2.45 0.50 0.80 0.98 0.98
EJE 1-1 ENTRE B3-C 1 2.45 0.50 0.80 0.98 0.98
EJE A-A ENTRE 3-4 1 2.25 0.50 0.80 0.90 0.90
EJE C-C ENTRE 2-3 1 3.05 0.50 0.80 1.22 1.22
CIMIENTO CORRIDO 3
EJE A-A ENTRE 1-2 1 1.40 0.40 0.80 0.45 0.45
EJE A3 ENTRE 1-2 1 1.40 0.40 0.80 0.45 0.45
EJE B3 ENTRE 1-2 1 1.40 0.40 0.80 0.45 0.45
EJE C-C ENTRE 1-2 1 1.40 0.40 0.80 0.45 0.45
CIMIENTO CORRIDO 4
EJE E-E ENTRE 2-4 1 8.35 0.70 0.80 4.68 4.68
CIMIENTO CORRIDO 5
EJE A-A ENTRE 2-4 1 5.50 1.20 0.80 5.28 5.28

01.04 OBRAS DE CONCRETO SIMPLE


01.04.01 FALSO PISO (E=10CM) CONCRETO F'C=140 KG/CM2 m2. 84.87
VEREDA EXTERIOR 1 1 2.20 1.80 3.96 3.96
VEREDA EXTERIOR 3 1 2.20 1.80 3.96 3.96
INGRESO A SSHH 1 3.40 1.95 6.63 6.63
SSHH DISCAPACITADOS 1 1.90 3.65 6.94 6.94
VANOS -1 0.90 0.15 0.14 -0.14
SSHH VARONES - AMB. 1 1 3.60 3.50 12.60 12.60
VANOS 1 1.00 0.15 0.15 0.15
SSHH VARONES - AMB. 2 1 5.65 3.95 22.32 22.32
VANOS 1 1.20 0.15 0.18 0.18
SSHH DAMAS - AMB. 1 1 3.75 3.50 13.13 13.13
VANOS 1 1.00 0.15 0.15 0.15
SSHH DAMAS - AMB. 2 1 3.75 3.95 14.81 14.81
VANOS 1 1.20 0.15 0.18 0.18

01.04.02 CONCRETO ALIGERADO EN AZOTEA m2 79.33


AREA TOTAL 1 AREA CAD 80.85 80.85 80.85
DUCTO DE VENTILACION -1 1.90 0.80 1.52 -1.52

01.05 OBRAS DE CONCRETO ARMADO


01.05.01 SOBRECIMIENTO ARMADO
01.05.01.01 SOBRECIMIENTO ARMADO F'c = 210 KG/CM2. m3 6.21
CIMIENTO CORRIDO 1
EJE 2-2 ENTRE A-A1 1 1.00 0.13 0.50 0.07 0.07
EJE 2-2 ENTRE A1-A4 1 0.83 0.13 0.80 0.09 0.09
EJE 2-2 ENTRE A4-B 1 1.20 0.13 0.80 0.12 0.12
EJE 2-2 ENTRE B-B2 1 1.20 0.13 0.80 0.12 0.12
EJE 2-2 ENTRE B2-B5 1 0.68 0.13 0.80 0.07 0.07
EJE 2-2 ENTRE B5-C 1 1.00 0.13 0.50 0.07 0.07
EJE 2-2 ENTRE C-E 1 1.90 0.13 0.50 0.12 0.12
HOJA DE METRADOS - ESTRUCTURAS

#REF!

FECHA: #REF!
SUB.PTO.: #REF!
METRADO : ESTRUCTURAS
N° DE Ancho Alto SUB-
ITEM DESCRIPCION UND Largo (m) PARCIAL TOTAL
VECES (m) (m) TOTAL
EJE 3-3 ENTRE A-A2 1 1.20 0.13 0.50 0.08 0.08
EJE 3-3 ENTRE A2-B 1 2.15 0.13 0.80 0.22 0.22
EJE 3-3 ENTRE B-B4 1 2.00 0.13 0.80 0.21 0.21
EJE 3-3 ENTRE B4-C 1 1.20 0.13 0.50 0.08 0.08
EJE 3-3 ENTRE C-E 1 1.60 0.13 0.80 0.17 0.17

EJE 4-4 ENTRE A-B 1 3.25 0.13 0.80 0.34 0.34


EJE 4-4 ENTRE B-B1 1 0.90 0.13 0.80 0.09 0.09
EJE 4-4 ENTRE B1-C2 1 3.25 0.13 0.80 0.34 0.34
EJE 4-4 ENTRE C2-E 1 0.73 0.13 0.80 0.08 0.08

EJE B-B ENTRE 2-3 1 3.32 0.13 0.80 0.34 0.34


EJE B-B ENTRE 3-4 1 3.77 0.13 0.80 0.39 0.39
CIMIENTO CORRIDO 2
EJE 1-1 ENTRE A-A3 1 1.40 0.13 0.80 0.15 0.15
EJE 1-1 ENTRE B3-C 1 1.40 0.13 0.80 0.15 0.15
EJE A-A ENTRE 3-4 1 2.48 0.13 0.80 0.26 0.26
EJE C-C ENTRE 2-3 1 3.00 0.13 0.80 0.31 0.31
CIMIENTO CORRIDO 3
EJE A-A ENTRE 1-2 1 1.80 0.13 0.50 0.12 0.12
EJE A3 ENTRE 1-2 1 1.80 0.13 0.50 0.12 0.12
EJE B3 ENTRE 1-2 1 1.80 0.13 0.50 0.12 0.12
EJE C-C ENTRE 1-2 1 1.80 0.13 0.50 0.12 0.12
CIMIENTO CORRIDO 4
EJE E-E ENTRE 2-2A 1 0.55 0.13 1.43 0.10 0.10
EJE E-E ENTRE 2A-3 1 2.15 0.13 1.43 0.40 0.40
EJE E-E ENTRE 3-4 1 3.70 0.13 1.43 0.69 0.69

CIMIENTO CORRIDO 5
EJE A-A ENTRE 2-3 1 3.13 0.13 1.20 0.49 0.49
EJE A-A ENTRE 3-4 1 1.35 0.13 1.20 0.21 0.21
SOBRECIMIENTO ARMADO ENCOFRADO Y DESENCOFRADO
01.05.01.02 m2 95.49
NORMAL
CIMIENTO CORRIDO 1
EJE 2-2 ENTRE A-A1 2 1.00 0.50 0.50 1.00
EJE 2-2 ENTRE A1-A4 2 0.83 0.80 0.66 1.32
EJE 2-2 ENTRE A4-B 2 1.20 0.80 0.96 1.92
EJE 2-2 ENTRE B-B2 2 1.20 0.80 0.96 1.92
EJE 2-2 ENTRE B2-B5 2 0.68 0.80 0.54 1.08
EJE 2-2 ENTRE B5-C 2 1.00 0.50 0.50 1.00
EJE 2-2 ENTRE C-E 2 1.90 0.50 0.95 1.90

EJE 3-3 ENTRE A-A2 2 1.20 0.50 0.60 1.20


EJE 3-3 ENTRE A2-B 2 2.15 0.80 1.72 3.44
EJE 3-3 ENTRE B-B4 2 2.00 0.80 1.60 3.20
EJE 3-3 ENTRE B4-C 2 1.20 0.50 0.60 1.20
EJE 3-3 ENTRE C-E 2 1.60 0.80 1.28 2.56

EJE 4-4 ENTRE A-B 2 3.25 0.80 2.60 5.20


EJE 4-4 ENTRE B-B1 2 0.90 0.80 0.72 1.44
EJE 4-4 ENTRE B1-C2 2 3.25 0.80 2.60 5.20
EJE 4-4 ENTRE C2-E 2 0.73 0.80 0.58 1.16

EJE B-B ENTRE 2-3 2 3.32 0.80 2.65 5.30


EJE B-B ENTRE 3-4 2 3.77 0.80 3.01 6.02
CIMIENTO CORRIDO 2
EJE 1-1 ENTRE A-A3 2 1.40 0.80 1.12 2.24
EJE 1-1 ENTRE B3-C 2 1.40 0.80 1.12 2.24
EJE A-A ENTRE 3-4 2 2.48 0.80 1.98 3.96
EJE C-C ENTRE 2-3 2 3.00 0.80 2.40 4.80
CIMIENTO CORRIDO 3
EJE A-A ENTRE 1-2 2 1.80 0.50 0.90 1.80
EJE A3 ENTRE 1-2 2 1.80 0.50 0.90 1.80
EJE B3 ENTRE 1-2 2 1.80 0.50 0.90 1.80
EJE C-C ENTRE 1-2 2 1.80 0.50 0.90 1.80
CIMIENTO CORRIDO 4
EJE E-E ENTRE 2-2A 2 0.55 1.43 0.78 1.57
EJE E-E ENTRE 2A-3 2 2.15 1.43 3.06 6.13
EJE E-E ENTRE 3-4 2 3.70 1.43 5.27 10.55

CIMIENTO CORRIDO 5
EJE A-A ENTRE 2-3 2 3.13 1.20 3.75 7.50
EJE A-A ENTRE 3-4 2 1.35 1.20 1.62 3.24
HOJA DE METRADOS - ESTRUCTURAS

#REF!

FECHA: #REF!
SUB.PTO.: #REF!
METRADO : ESTRUCTURAS
N° DE Ancho Alto SUB-
ITEM DESCRIPCION UND Largo (m) PARCIAL TOTAL
VECES (m) (m) TOTAL

01.05.01.03 SOBRECIMIENTO ARMADO, ACERO FY = 4200 KG/CM2 Kg. 512.23

01.05.02 COLUMNAS
01.05.02.01 COLUMNA, CONCRETO F'C=210 Kg./CM2 m3 4.27
1ER NIVEL
Columna C-1
ENTRE EJES 1 Y A 1 0.40 0.13 3.50 0.18 0.18
ENTRE EJES 1 Y A3 1 0.40 0.13 3.50 0.18 0.18
ENTRE EJES 1 Y B3 1 0.40 0.13 3.50 0.18 0.18
ENTRE EJES 1 Y C 1 0.40 0.13 3.50 0.18 0.18

ENTRE EJES 2 Y A 1 0.40 0.13 5.30 0.28 0.28


ENTRE EJES 2 Y B 1 0.40 0.13 3.50 0.18 0.18
ENTRE EJES 2 Y C 1 0.40 0.13 3.50 0.18 0.18
ENTRE EJES 2 Y D 1 0.40 0.13 4.13 0.21 0.21

ENTRE EJES 3 Y A 1 0.40 0.13 5.30 0.28 0.28


ENTRE EJES 3 Y A2 1 0.40 0.13 3.50 0.18 0.18
ENTRE EJES 3 Y B4 1 0.40 0.13 3.50 0.18 0.18

Columna C-2
ENTRE EJES 2-A1 1 0.30 0.13 3.50 0.14 0.14
ENTRE EJES 2-A4 1 0.30 0.13 3.50 0.14 0.14
ENTRE EJES 2-B2 1 0.30 0.13 3.50 0.14 0.14
ENTRE EJES 2-B5 1 0.30 0.13 3.50 0.14 0.14
ENTRE EJES 4-B 1 0.30 0.13 3.50 0.14 0.14
ENTRE EJES 4-B1 1 0.30 0.13 3.50 0.14 0.14
ENTRE EJES 4-C2 1 0.30 0.13 3.50 0.14 0.14

Columna C-3
ENTRE EJES 3 Y B 1 0.50 0.13 3.50 0.23 0.23
ENTRE EJES 4 Y A 1 0.50 0.13 3.50 0.23 0.23
Columna C-4
ENTRE EJES 3 Y C 1 0.55 0.13 3.50 0.25 0.25
ENTRE EJES 3 Y D 1 0.55 0.13 3.50 0.25 0.25

Columna C-5
ENTRE EJES D Y 2A 1 0.30 0.13 3.50 0.14 0.14

01.05.02.02 COLUMNAS, ENCOFRADO Y DESENCOFRADO NORMAL m2 68.45


Perimetro
1ER NIVEL
Columna C-1
ENTRE EJES 1 Y A 1 0.93 3.50 3.26 3.26
ENTRE EJES 1 Y A3 1 0.93 3.50 3.26 3.26
ENTRE EJES 1 Y B3 1 0.93 3.50 3.26 3.26
ENTRE EJES 1 Y C 1 0.93 3.50 3.26 3.26

ENTRE EJES 2 Y A 1 0.93 5.30 4.93 4.93


ENTRE EJES 2 Y B 1 0.67 3.50 2.35 2.35
ENTRE EJES 2 Y C 1 0.93 3.50 3.26 3.26
ENTRE EJES 2 Y D 1 0.93 4.13 3.84 3.84

ENTRE EJES 3 Y A 1 0.80 5.30 4.24 4.24


ENTRE EJES 3 Y A2 1 0.93 3.50 3.26 3.26
ENTRE EJES 3 Y B4 1 0.93 3.50 3.26 3.26

Columna C-2
ENTRE EJES 2-A1 1 0.73 3.50 2.55 2.55
ENTRE EJES 2-A4 1 0.60 3.50 2.10 2.10
ENTRE EJES 2-B2 1 0.60 3.50 2.10 2.10
ENTRE EJES 2-B5 1 0.60 3.50 2.10 2.10
ENTRE EJES 4-B 1 0.57 3.50 2.00 2.00
ENTRE EJES 4-B1 1 0.60 3.50 2.10 2.10
ENTRE EJES 4-C2 1 0.60 3.50 2.10 2.10

Columna C-3
ENTRE EJES 3 Y B 1 0.74 3.50 2.59 2.59
ENTRE EJES 4 Y A 1 1.00 3.50 3.50 3.50
Columna C-4
ENTRE EJES 3 Y C 1 1.10 3.50 3.85 3.85
ENTRE EJES 3 Y D 1 1.05 3.50 3.68 3.68
HOJA DE METRADOS - ESTRUCTURAS

#REF!

FECHA: #REF!
SUB.PTO.: #REF!
METRADO : ESTRUCTURAS
N° DE Ancho Alto SUB-
ITEM DESCRIPCION UND Largo (m) PARCIAL TOTAL
VECES (m) (m) TOTAL

Columna C-5
ENTRE EJES D Y 2A 1 0.47 3.50 1.65 1.65

01.05.02.03 COLUMNA,ACERO F'Y = 4200 KG/CM2 Kg. 779.11

01.05.04 VIGAS
01.05.04.01 VIGA, CONCRETO F'C=210 Kg./CM2 m3 2.93
VP-101 (0.13x0.40)
EJE 1-1 ENTRE A-A3 1 1.40 0.13 0.40 0.07 0.07
EJE 1-1 ENTRE B3-C 1 1.40 0.13 0.40 0.07 0.07
EJE 2-2 ENTRE A-A1 1 1.00 0.13 0.40 0.05 0.05
EJE 2-2 ENTRE A1-A4 1 0.83 0.13 0.40 0.04 0.04
EJE 2-2 ENTRE A4-B 1 1.20 0.13 0.40 0.06 0.06
EJE 2-2 ENTRE B-B2 1 1.20 0.13 0.40 0.06 0.06
EJE 2-2 ENTRE B2-B5 1 0.68 0.13 0.40 0.04 0.04
EJE 2-2 ENTRE B5-C 1 1.00 0.13 0.40 0.05 0.05
EJE 2-2 ENTRE C-D 1 1.90 0.13 0.40 0.10 0.10
EJE 4-4 ENTRE A-B 1 3.25 0.13 0.40 0.17 0.17
EJE 4-4 ENTRE B-B1 1 0.90 0.13 0.40 0.05 0.05
EJE 4-4 ENTRE B1-C2 1 3.25 0.13 0.40 0.17 0.17
EJE 4-4 ENTRE C2-D 1 0.73 0.13 0.40 0.04 0.04

EJE A-A ENTRE 1-2 1 1.80 0.13 0.40 0.09 0.09


EJE A-A ENTRE 2-3 1 3.13 0.13 0.40 0.16 0.16
EJE A-A ENTRE 3-4 1 3.83 0.13 0.40 0.20 0.20

EJE A3 ENTRE 1-2 1 1.80 0.13 0.40 0.09 0.09


EJE B-B ENTRE 2-3 1 3.32 0.13 0.40 0.17 0.17
EJE B-B ENTRE 3-4 1 3.77 0.13 0.40 0.20 0.20

EJE B3 ENTRE 1-2 1 1.80 0.13 0.40 0.09 0.09


EJE C-C ENTRE 1-2 1 1.80 0.13 0.40 0.09 0.09
EJE C-C ENTRE 2-3 1 3.00 0.13 0.40 0.16 0.16

EJE E-E ENTRE 2-2A 1 0.55 0.13 0.40 0.03 0.03


EJE E-E ENTRE 2A-3 1 2.15 0.13 0.40 0.11 0.11
EJE E-E ENTRE 3-4 1 3.70 0.13 0.40 0.19 0.19

VP-102 (0.13x0.30)
EJE 3-3 ENTRE A-A2 1 1.20 0.13 0.30 0.05 0.05
EJE 3-3 ENTRE A2-B 1 2.15 0.13 0.30 0.08 0.08
EJE 3-3 ENTRE B-B4 1 2.00 0.13 0.30 0.08 0.08
EJE 3-3 ENTRE B4-C 1 1.20 0.13 0.30 0.05 0.05
EJE 3-3 ENTRE C-D 1 1.60 0.13 0.30 0.06 0.06

V-1 (0.13x0.20)
EJE 2A-2A ENTRE C-D 1 1.90 0.13 0.20 0.05 0.05