SECRETARIA DE INFRAESTRUCTURA
PRECIOS DE REFERENCIA PARA EL DEPARTAMENTO DEL CESAR
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
XI RIEGO
269.00 SUMINISTRO E INSTALACION DE TUBERIA DE 2" PVC RDE 41,
INCLUYE ACCESORIOS ML 18,073.00
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
294.00 LAMPARA TIPO DJK ROY ALPHA O SIMILAR O DE MEJOR
CALIDAD DE SODIO DE 150 W A 220 V (INLCUYE LA LÁMPARA Y
BOMBILLA, ACCESORIOS DE CONEXIÓN, PEDESTAL EN
CONCRETO CON HIERRO DE REFUERZO, Y POSTE EN TUBO DE UN #REF!
HIERRO GALVANIZADO DE 2"X3M)-INCL. SALIDA.
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
313.00 ESTRUCTURA PARA PROTECCIONES TRIFASICA ( COMPLETA )
NORMA ELECTRICARIBE S.A E.S.P UN 1,931,627.00
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
324.00 TRANSFORMADOR TRIFASICO DE 300 kVA A 13,2KV/220 -127
V (SE INCLUYE EL FOSO DE ACEITE Y PLATINAS MONTAJE UN 32,822,910.00
TRAFO)
325.00 MALLA DE PUESTA A TIERRA 3 VARILLAS, CON CABLE DE COBRE
DESNUDO No 2 Y QUIMICO PARA MEJORAR TIERRA HASTA UN 2,564,593.00
OBTENER 5 OHMIOS (SOLO CABLE Y QUIMICO)
326.00 MALLA DE PUESTA A TIERRA 3 VARILLAS, CON CABLE DE COBRE
DESNUDO No 2/0 Y QUIMICO PARA MEJORAR TIERRA HASTA
OBTENER 5 OHMIOS (SOLO CABLE Y QUIMICO) UN 2,333,593.00
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
334.00 ACOMETIDA EN CABLE DE COBRE TIPO THWN EN 3 NO. 4
+1 No 4N+1No 6T-TUB. CONDUIT PVC DE 1 1/2" ML 65,869.00
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
342.00 TABLERO TRIFASICO DE 18 CTOS DE 225A-240V CON LLAVE
(CON BREAKERS ENCHUFABLES 12 DE 1X20A Y 2 DE UN 542,583.00
2X20A)LUMINEX O SIMILAR
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
351.00 PUERTAS EN VIDRIO CRISTAL INCOLORO TEMPLADO DE 10mm,
CON PERFIL ZOCALO INFERIOR, PERFIL F SUPERIOR PARA
CUERPOS FIJOS, BISAGRA HIDRAULICA DE PISO, BASE INFERIOR
DE ZOCALO, CERROJO PARA ZOCALO, CHAPETA CON
CERRADURA, MANIJA VERTICAL DE PISO DE 0.50 mts TIPO
ROMA, ESQUINERO SUPERIOR, PIVOTE AEREO DE PLATINA,
CERRADURA DOBLE CILINDRO, EN ZOCALO INFERIOR CON UN UN 1,838,554.00
CUERPO BATIENTE, CUERPO FIJO LATERAL, POLARIZADO CON
PAPEL ESMERILADO, H- 1,00 mts. DIMENSIONES DE LA PUERTA
1,22mts * 2,05 mts INCLUYE INSTALACION.
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
353.00 PUERTAS EN VIDRIO CRISTAL INCOLORO TEMPLADO DE 10mm,
CON PERFIL ZOCALO INFERIOR, PERFIL F SUPERIOR PARA
CUERPOS FIJOS, BISAGRA HIDRAULICA DE PISO, BASE INFERIOR
DE ZOCALO, CERROJO PARA ZOCALO, CHAPETA CON
CERRADURA, MANIJA VERTICAL DE PISO DE 0.50 mts TIPO
ROMA, ESQUINERO SUPERIOR, PIVOTE AEREO DE PLATINA,
CERRADURA DOBLE CILINDRO, EN ZOCALO INFERIOR CON UN UN 2,318,337.00
CUERPO BATIENTE, UN CUERPO FIJO LATERAL POLARIZADO
CON PAPEL REFLECTIVO TIPO ESPEJO, DIMENSIONES DE LA
PUERTA 2,20mts * 2,05 mts INCLUYE INSTALACION.
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
364.00 PUERTAS - DIVISIONES BAÑOS LAMINA CAL. 18, EN ACERO
INOXIDABLE, INSTALADA. M2 881,403.00
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
374.00 PUERTA TRIPLEX 2.40*0.80 Y 0.70 MARCO METALICO, INCLUYE
CERRADURA, PINTURA Y VIDRIO MONTANTE UN 306,900.00
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
386.00 RECUBRIMIENTO EN PLOMO 2 MM. PARA MUROS
M2 99,768.00
XV ACABADOS Y PINTURAS
389.00 ESTUCO ACRILICO M2 23,458.00
390.00 DILATACIONES EN ESTUCO M2 3,094.00
391.00 ESTUCO M2 15,401.00
392.00 HUELLA Y CONTRAHUELLA EN PIEDRA CHINA INCL. PIRLAN
DESARROLLO .42MT Ml 54,103.00
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
403.00 PULIPLAST-ANALISIS BASICO CÑTE 69,175.00
404.00 PULIPLAST APLICADO EN FACHADA M2 29,366.00
405.00 GRANIPLAST APLICADO EN FACHADA M2 24,328.00
406.00 KORAZA 3 MANOS O SIMILAR M2 18,270.00
407.00 PINTURA EPOXICA PINTUCO O SIMILAR M2 38,319.00
408.00 WAS PRIMER ACONDICIONADOR DE SUPERFICIES METÁLICAS
EN DOS COMPONENTES, EN ENVASES SEPARADOS: EL
COMPONENTE A, UN PRODUCTO VINÍLICO CON CROMATO DE M2 6,724.00
ZINC Y EL COMPONENTE B, UNA SOLUCIÓN ÁCIDA
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
424.00 LAVAMANOS DE SOBREPONER MARCELLA BLANCO O SIMILAR
SIN GRIFERIA UN 138,774.00
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
441.00 CERRAMIENTO EN ALAMBRE DE PUAS CA3. 12.5 - 5 HILOS,
POSTE CONCRETO C/2MT DE .10X.10X2.30 DE 3000 PSI-INCL. ML 44,483.00
SUINGLEA CADA .50-H=.50
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
452.00 PORTERIA POLIFUNCIONAL EN TUBO GALVANIZADO TIPO
PESADO DE 2 1/2", SOPRTE DE TABLERO EN TUBO DE 1 1/2"
TIPO PESADO TABLERO FIBRA DE VIDRIO DE 1,80' X1,05, CON JGO 6,369,594.00
REFUERZO EN ANGULO 1X 3/16, ARO VARILLA DE 1/2"
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
463.00 SUMINSTRO Y SIEMBRA ARBOLES NATIVOS-2.50 MT ALTURA-
DIAMETRO .10CM DE TALLO. UN 144,226.00
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
473.00 SUMINISTRO E INSTALACION DE SEÑALES DE TRANSITO DE .75
x .75 EN LAMINA GALVANIZADA CAL. 18, FONDO REFLECTIVO Y
LOS SIMBOLOS DE ACUERDO AL COLOR DE LA SEÑAL INDICADA, UN 337,712.00
PARAL VERTICAL EN ANGULO DE HIERRO DE 2X1/4"
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
481.00 SUMINISTRO E INSTALACION DE BANCAS EN CONCRETO Y
ESPALDAR EN EXPANDIDA Iwd 20 CR 18 Cafetera . M 30 -INCL. UN 1,304,795.00
EMPOTRAMIENTO
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
497.00 CUARTO DE CONTROL UN 454,501.94
498.00 DUCTO VERTICAL 30X8 ML 71,765.12
499.00 GABINETE RACK CERRADO UN 764,696.91
500.00 PATCH CORD 2m ML 69,071.18
501.00 PATCH PANEL UN 254,270.41
502.00 SALIDA DE VOZ Y DATOS UN 57,607.99
503.00 PODA DE ARBOLES DE (INCLUYE PODA, Y RETIRO SOBRANTES -
MAYOR DE 3.00 MT Y DIAMETRO DE .30 M A 1,0 M UN
349,999.68
XIX ESTUDIOS CALIDAD-RESISTENCIA MATER.
ANALISIS DE SUELOS
504.00 C.B.R.INALTERADO UN
505.00 C.B.R.MATERIAL COHESIVO UN 320,000.00
506.00 C.B.R.MATERIAL GRANULAR UN 320,000.00
507.00 COMPRESION INCONFINADA UN
508.00 DENSIDAD TERRENO(DENSIMETRO NUCLEAR) UN
509.00 GRANULOMETRIA POR TAMIZADO (CON LAVADO) UN 41,000.00
510.00 GRANULOMETRIA POR TAMIZADO (SIN LAVADO) UN 41,000.00
511.00 HUMEDAD NATURAL UN 10,000.00
512.00 LAVADO SOBRE TAMIZ NRO 200 UN 41,000.00
513.00 LIMITES DE ATTERBERG UN 41,000.00
514.00 PENETRACION A PERCUSION DE 0.0M A 4.0M ML
515.00 PENETRACION A PERCUSION-10M EN ADELANTE ML
516.00 PERFORACION BARRENO MANUAL 1.5M A 2.0M ML 20,000.00
517.00 PESO ESPECIFICO UN 40,000.00
518.00 PROCTOR MODIFICADO UN 80,000.00
519.00 VISITA FRUSTRADA EN TOMA DE DENSIDADES UN
520.00 ANALISIS RESISTENCIA CONCRETO UN
521.00 ALQUILER FORMALETA Y CONO(UND POR DIA UN 2,000.00
522.00 COMPRESION DE CILINDROS UN 8,000.00
523.00 COMPRESION DE MURETES UN
GOBERNACION DEL CESAR
SECRETARIA DE INFRAESTRUCTURA
PRECIOS DE REFERENCIA PARA EL DEPARTAMENTO DEL CESAR
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
524.00 DISENO DE MEZCLAS-UNA RESISTENCIA UN 220,000.00
525.00 FLEXION EN ADOQUINES UN 8,000.00
526.00 PESO UNITARIO DE BLOQUES UN 8,000.00
527.00 ROTURA DE BLOQUES UN 8,000.00
528.00 ROTURA DE LADRILLOS UN 8,000.00
529.00 ROTURA DE MORTERO UN 8,000.00
530.00 ROTURA DE VIGAS UN 15,000.00
531.00 ANALISIS AGREGADOS
532.00 CONTENIDO MATERIA ORGANICA(COLORIMETRIA) UN 40,000.00
533.00 DESGASTE EN LA MAQUINA DE LOS ANGELES UN 80,000.00
534.00 PESO ESPECIFICO Y ABSORCION UN 40,000.00
535.00 PESO UNITARIO SUELTO Y APISONADO UN 40,000.00
536.00 ANALISIS ASFALTOS
537.00 ADHERENCIA UN 40,000.00
538.00 DENSIDAD PAV.ASFALT.(DENSIMET.NUCLEAR) UN
539.00 ESTABILIDAD Y FLUJO MARSHALL UN 50,000.00
540.00 EXTRACCION DE CONTENIDO ASFALTICO UN 40,000.00
541.00 EXTRACCION MANUAL DE UNA MUESTRA DE PAV. UN 50,000.00
542.00 GRANULOMETRIA AGREGADOS DE LAS MEZCLAS UN 40,000.00
543.00 PESO UNITARIO DE BRIQUETES Y O GALLETAS UN 40,000.00
544.00 TOMA DE BRIQUETES UN
545.00 ENSAYO ESCLEROMETRIA-NUCLEOS
546.00 ENSAYO DE NUCLEO A COMPRESION UN 8,000.00
547.00 EXTRACCION Y ENSAYOS DE NUCLEO DE 2" UN
548.00 EXTRACCION Y ENSAYOS DE NUCLEO DE 3" UN
549.00 EXTRACCION Y ENSAYOS DE NUCLEO DE 4" UN 80,000.00
550.00 EXTRACCION Y ENSAYOS DE NUCLEO DE 6" UN
XX TRANSPORTE
FACTOR MULTIPLICADOR APLICADO A MATERIALES, NO INCL.
PETREOS
GOBERNACION DEL CESAR
SECRETARIA DE INFRAESTRUCTURA
PRECIOS DE REFERENCIA PARA EL DEPARTAMENTO DEL CESAR
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
551.00 VALLEDUPAR PUEBLO BELLO % 8.00
552.00 VALLEDUPAR CODAZZI % 4.00
553.00 VALLEDUPAR LA PAZ % 2.00
554.00 VALLEDUPAR MANAURE % 8.00
555.00 VALLEDUPAR LA JAGUA % 6.00
556.00 VALLEDUPAR BECERRIL % 5.00
557.00 VALLEDUPAR BOSCONIA % 4.00
558.00 VALLEDUPAR COPEY % 5.00
559.00 VALLEDUPAR ASTREA % 5.00
560.00 VALLEDUPAR CHIMICHAGUA % 6.00
561.00 VALLEDUPAR LA LOMA % 6.00
562.00 VALLEDUPAR ATANQUEZ % 8.00
563.00 VALLEDUPAR CHIRIGUANA % 6.00
564.00 FLETE ESTRUCTURA EN ACERO KG 60.00
565.00 TRANSPORTE DE PETREOS de 100 ml a 1.000 ml M3/K
M 753.00
566.00 GRUA PH 10 TON-TRANSPORTE DISTANCIA MAX 300KM TRAMO
567.00 GRUA PH 10 TON SE COBRA A PARTIR DE LA SALIDA DEL DIA
XXI EQUIPO
DISTANCIA ENTRE LOS CENTROS URBANOS DEL CESAR
VALLEDUPAR LA PAZ KM 18.00
VALLEDUPAR PUEBLO BELLO KM 44.49
VALLEDUPAR ATANQUEZ KM 39.14
VALLEDUPAR MANAURE KM 41.00
VALLEDUPAR SANDIEGO KM 25.00
VALLEDUPAR CODAZZI KM 66.00
VALLEDUPAR BECERRIL KM 97.00
VALLEDUPAR LA JAGUA DE IBIRICO KM 113.00
VALLEDUPAR CHIRIGUANA KM 148.00
VALLEDUPAR BOSCONIA KM 89.00
VALLEDUPAR COPEY KM 110.00
GOBERNACION DEL CESAR
SECRETARIA DE INFRAESTRUCTURA
PRECIOS DE REFERENCIA PARA EL DEPARTAMENTO DEL CESAR
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNITARIO
VALLEDUPAR LA LOMA KM 139.00
VALLEDUPAR EL PASO KM 128.00
VALLEDUPAR ASTREA KM 157.00
VALLEDUPAR CHIMICHAGUA KM 187.00
VALLEDUPAR CURUMANI KM 178.00
AGUACHICA CURUMANI KM 111.00
AGUACHICA PAILITAS KM 76.00
AGUACHICA PELAYA KM 44.00
AGUACHICA TAMALAMEQUE KM 79.00
AGUACHICA GONZALEZ KM 70.00
AGUACHICA RIO DE ORO KM 47.00
AGUACHICA SAN MARTIN KM 40.21
AGUACHICA SAN ALBERTO KM 68.00
AGUACHICA GAMARRA KM 14.00
AGUACHICA LA GLORIA KM 58.49
TRANSPORTE
GOBERNACION DEL CESAR
SECRETARIA DE INFRAESTRUCTURA
PRECIOS DE REFERENCIA PARA EL DEPARTAMENTO DEL CESAR
LISTADO DE MATERIALES-VALLEDUPAR
Calle 16 No 12 - 120 - Telefax: (5) 5749671 - e-mail:
obras@gobcesar.gov.co - Valledupar, Cesar.
FECHA: 2.021
ITEMS DESCRIPCION UN VR. UNIT
ESTACA DE MADERA UN 1,100.00
TABLA ALGARROBILLO 1" X 40CMT X 3 MTS UN 50,000.00
ALGARROBILLO 2"X2"X3.00MT UN 14,000.00
TABLA 1''X12"X3.00MT ALGARROBILLO UN 18,000.00
TABLA CEDRO / TOLUA 1" X 30 CM X 3MTS UN 53,550.00
TABLA 1''X4"X3.00MT ALGARROBILLO UN 10,000.00
TABLAS ALGARROBILLO 1" X 30 X 3MTS UN 18,872.00
TABLA ALGARROBILLO BURRA 25CMT X3MTR UN 15,750.00
ALGARROBILLO PIE 1,400.00
TOLUA PIE 4,100.00
CEDRO PIE 3,100.00
ROBLE PIE 3,100.00
CARRETO PIE 3,100.00
ABARCO PIE
EQUIPO DE TOPOGRAFIA (INCLUYE TRANSITO, NIVEL Y
COMPLEMENTARIOS) MES 2,326,000.00
MOTONIVELADORA HR 170,000.00
VOLQUETA 6 M3 vj 120,000.00
Cargador : Potencia en el volante 110 hp, Clasificación de RPM del
motor 2300. h 141,000.00
Retroexcavadora sobre oruga, potencia 138 HP, balde de 1,5 m3. h 180,000.00
COMPRESOR DE 2 MARTILLOS h 81,200.00
AGUA DE CARROTANQUE lt 50.00
VIBRO DINAPAC HR 90,000.00
CARROTANQUE 1.000 LTS HR 71,700.00
VIBROCOMPACTADOR TIPO RANA d 116,620.00
PUNTILLA CON CABEZA 2 1/2" 104UN/LB LB 3,089.50
ITEMS DESCRIPCION UN VR. UNIT
PUNTILLA CON CABEZA 2" 159UN/LB lb 3,089.50
PUNTILLA CON CABEZA 3/4 a 1" lb 3,502.60
PUNTILLA CON CABEZA 1 1/ 2 a 3 1/2" lb 2,691.20
ALAMBRE NEGRO NO.18 105ML/KG kg 3,626.39
ACERO DE REFUERZO PDR-40 kg 3,648.00
ACERO DE REFUERZO PDR-60 kg 3,751.00
ACERO DE Ø1/4 CORRUGADA ml 653.00
ACERO DE Ø1/4 CORRUGADA kg
ACERO DE Ø3/8 CORRUGADA ml 1,650.00
ACERO DE Ø3/8 CORRUGADA kg
ACERO DE Ø1/2 CORRUGADA ml 2,955.00
ACERO DE Ø1/2 CORRUGADA kg
ACERO DE Ø5/8 CORRUGADA ml 4,593.00
ACERO DE Ø5/8 CORRUGADA kg
ACERO DE Ø3/4 CORRUGADA ml 6,562.00
ACERO DE Ø3/4 CORRUGADA kg
ACERO DE Ø3/4 LISO kg 3,200.00
ACERO DE Ø1 CORRUGADA kg 3,200.00
ANGULO DE 2.5X2.5X1/4* ml 17,927.17
ANGULO DE 2X2X1/4* ml 11,919.83
ANGULO DE 2X2X1/8* ml 6,101.67
PLATINA 6M 1-1/2 * 1/4 ML 6,018.54
ALAMBRE GALVANIZADO #10-14ML/KG KG 3,953.00
GAVIONES 2X1X1 CAL 13 UN 71,855.00
SEGUETA NICHOLSON UN 18,723.00
TRAFO TRIFASICO DE 300 kVA A NIVEL DE 13,2 KV/ 220 -127 V UN 31,958,290.00
TRANSFORMADOR MONOFASICO DE 5 kVA UN
TRANSFORMADOR MONOFASICO DE 10 kVA UN 2,359,648.80
TRANSFORMADOR MONOFASICO DE 15 kVA UN 2,725,466.40
TRANSFORMADOR MONOFASICO DE 25 kVA UN 3,461,486.40
TRANSFORMADOR MONOFASICO DE 37.5 kVA UN 5,504,271.92
TRANSFORMADOR MONOFASICO DE 50 kVA UN 8,027,200.00
TRANSFORMADOR MONOFASICO DE 75 kVA UN 8,027,200.00
TRANSFORMADOR MONOFASICO DE 100 kVA UN
TRANSFORMADOR TRIFASICO DE 15 kVA UN 5,637,600.00
TRANSFORMADOR TRIFASICO DE 30 kVA UN 6,409,000.00
TRANSFORMADOR TRIFASICO DE 45 kVA UN 7,720,960.00
TRANSFORMADOR TRIFASICO DE 75 kVA UN 9,671,500.00
TRANSFORMADOR TRIFASICO DE 112.5 kVA UN 12,772,180.00
TRANSFORMADOR TRIFASICO DE 150 kVA UN 15,022,000.00
TRANSFORMADOR TRIFASICO DE 225 kVA UN 20,921,760.00
TRANSFORMADOR TRIFASICO DE 300 kVA UN 31,958,290.00
FOSO PARA EL ACEITE Y PLATINAS MONTAJE DEL TRAFO UN 290,000.00
TRANSFORMADOR TRIFASICO DE 75 kVA UN 9,976,000.00
TRANSFORMADOR TRIFASICO DE 30 Kva 13.2 UN 6,728,000.00
TERMINAL PARA PONCHAR TIPO 3M PARA CABLE 2/0 UN 17,400.00
ITEMS DESCRIPCION UN VR. UNIT
CARCAMO DE 0,5M ANCHO X0.4M PROF. ( CON TAPA EN LAMINA
COLD ROLLED DE 3MM ML 152,192.00
-
-
-
Cesar 2021
Cesar 2021
Cesar 2021
Cesar 2021
2,204.00
90,000.00
3,169.12
5,115.60
5,115.60
10,723.04
10,723.04
27,262.32
27,262.32
28,594.00
28,594.00
41,510.60
41,510.60
43,511.51
73,288.80
117,385.32
90,034.56
45,238.14
5,238.56
61,991.33
3,319.92
2,770.00
15,128.00
17,105.00
8,658.00
9,739.00
5,044.00
31,668.00
8,217.50
8,811.00
1,750.00
2,479.00
2,481.00
1,318.00
1,838.00
6,628.17
4,728.00
10,581.00
4,811.00
1,181.00
1,299.00
2,114.00
3,840.00
57,536.00
julio - 2.013
julio - 2.013
julio - 2.015 631,759.20
58,058.00
157,760.00
207,130.00
2,017 57,072.00
44,080.00
32,364.00
987,160.00
170,195.00
114,840.00
69,351.00
308,096.00
35,960.00
30,856.00
80,040.00
684,864.00
598,084.00
1 de marzo de 2014
1 de marzo de 2014
COTIZAR
17,980.00
17,780.00
14,300.00
28,050.00
25,000.00
31,633.80
4,620.00
3,146.00
29,000.00
3,300.00
15,704.00
1,660.00
3,538.00
17,400.00
8,200.00
724.18
759.50
669.42
629.40
27,500.00
46,132.00
46,132.00
48,617.00
57,295.00
48,800.00
35,000.00
5,000.00
5,318.00
-
-
86,900.00
800.00
23,950.00
368.00
1,939.50
510.00
2,900.00
7,500.00
9,100.00
37,000.00
74,940.00
2,017
2,017
2,017
2,017
2,017
2,017
2,017
2,017
2,017
2,017
2,017
2,017
2,017
2,017
2,017
2,017
2,017
2,017
2,017
2,017
2,017
2,016 2,015
2,016 2,015
2,016 2,015
2,016 2,015
2,016 2,015
2,016 2,015
2,016 2,015
2,015
2,015
2,015
2,015
2,015
2,015
1 de noviembre de 2012 25,000.00
1 de noviembre de 2012 20,000.00
1 de noviembre de 2012
354,743.00
79,600.00
4,298.00
1,927.00
4,986.00
5,634.00
1,369.00
140,000.00
858.00
826.00
1,717.00
100.00
3,200.00
19,063.00
10,500.00
6,250.00
13,650.00
80,000.00
25,000.00
16,949.00
65,833.00
4,500.00
2,800.00
2,600.00
16,000.00
25,000.00
12,000.00
26,000.00
6,000.00
16,000.00
38,000.00
56,000.00
211,390.28
72,692.56
78,000.00
125,000.00
16,000.00
273,000.00
115,000.00
110,000.00
650,000.00
2,800,000.00
12,605,430.00
1,500,000.00
50,000.00
5,059,084.00
1,100,000.00
21,397,824.00
2,996,280.00
250,000.00
8,600,000.00
5,800,000.00
15,000.00
131,200.00
1,500,000.00
1,474,910.00
350,000.00
350,000.00
350,000.00
350,000.00
350,000.00
390,000.00
4,072,000.00
280,000.00
300,000.00
385,000.00
9,000.00
29,000.00
76,000.00
290,000.00
380,000.00
270,000.00
210,000.00
240,000.00
420,000.00
30,000.00
1,509.00
1,914.00
2,000.00
24,520.00
10,000.00
8,200.00
26,000.00
49,874.20
22,919.32
110.00
5,000.00
100.00
17,000.00
27,000.00
286,000.00
66,999.00
12,122.00
1,000.00
257,346.00
14,268.00
186,000.00
12,000.00
100.00
2,000,000.00
2,000,000.00
159,300.00
99,200.00
271,000.00
250,000.00
144,000.00
150,000.00
360,000.00
480,000.00
600,000.00
680,000.00
4,500.00
6,500.00
230,000.00
26,000.00
22,000.00
19,000.00
52,000.00
40,500.00
65,000.00
16,500.00
2,484.00
19,000.00
2,262.00
21,480.00
21,027.00
110,000.00
51,381.00
700,000.00
2,527.00
2,319.00
5,685.00
2,484.00
19,465.00
105,000.00
123,000.00
6,823.00
16,512.00
49,068.00
140,000.00
180,000.00
41,600.00
62,000.00
11,020.41
12,653.06
10,000.00
11,379.31
120,000.00
75,000.00
85,000.00
78,000.00
80,000.00
95,000.00
98,000.00
54,000.00
8,000.00
45,553.00
45,553.00
53,200.00
1,500.00
370,000.00
270,000.00
55,000.00
80,000.00
11,500.00
125,001.60
5,800,000.00
70,000.00
120.00
2,449.00
17,000.00
2,800.00
Cesar 2016 31,154.00
Cesar 2016 16,702.00
Cesar 2017 2,058.96
Cesar 2016
2,531.28
33,233.90
54,526.14
87,241.82
32,715.68
2,722.00
9,492.00
57,751.00
283,001.00
68,875.00
115,942.00
26,000.00
80,000.00
11,265.00
7,598.00
8,751.00
7,615.00
300.00
450.00
42,751.00
6,728.00
68,501.00
101,700.00
25,000.00
26,500.00
406.00
13,606.00
225.04
408.32
28,947.00
54,288.00
61,022.00
106,978.00
157,320.00
38,764.00
27,530.00
35,396.00
51,128.00
103,590.00
854.92
2,490.00
130,300.00
83,300.00
69,900.00
77,900.00
94,900.00
64,900.00
185,000.00
55,400.00
175,900.00
2015 2,015.00
241,900.00
2015 469,900.00
71,000.00
35,900.00
219,900.04
285,132.64
69,900.00
364,900.04
111,900.56
3,820.00
550,000.00
45,900.00
88,500.00
330,000.00
37,000.00
11,000.00
33,833.72
ENERO-2.017 12,495.00
ENERO-2.017
ENERO-2.017 15,250.52
3,316.00
2018
El Educador Enero 31-17
T. COSTO IDU
LINIERO ESPECIALIZADO
SALARIO PACTO $ 75,711
AUXILIO DE TRANSPORTE
DESGASTE DE HERRAMIENTAS $ -
JORNAL TOTAL $ 75,711
DESCANSOS REMUNERADOS
TIEMPO PAGADO Y NO LABORADO 27.22%
MAYOR VALOR PRESTACIONAL POR TIEMPO 17.83%
TOTAL 45.05%
NOTAS: VALORES CONTRATACIÓN A FECHA. CORRECCIÓN CON SALARIO MÍNIMO Y AUXILIO DE TRANSPORTE PARA 2013.
VESTIDOS Y CALZADOS DE ACUERDO A CONVENCIÓN FIRMADA EL 14 DE JULIO DE 1998.
* En la cuadrilla BF se requiere de Un (1) Capátaz, dos (2) linieros expertos y dos (2) ayudantes prácticos.
**En la cuadrilla BC se requiere de Un (1) Capátaz, Un (1) Liniero Especializado, Dos (2) linieros expertos y Un (1) ayudantes
*** En la cuadrilla de Topografía se requiere de dos (2) cadeneros.
Cuadrilla Topografia ***
$ 90,853
$ 121,137
$ 211,989
$ 209,870
$ 421,859
$ 52,732
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
TRANSPORTE % - 216,328.19 -
HERRAMIENTAS MENORES %MO 0.03 12,074.05 362.22
MANO DE OBRA BB hc 0.42 28,747.73 12,074.05
SECRETARIA DE INFRAESTRUCTURA
PRECIOS DE REFERENCIA PARA EL DEPARTAMENTO DEL CESAR
ANALISIS DE PRECIOS UNITARIOS DE REFERENCIA PARA EL
DEPARTAMENTO DEL CESAR
Calle 16 No 12 - 120 - Telefax: (5) 5749671 - e-mail:
obras@gobcesar.gov.co - Valledupar, Cesar.
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
UN 2,933,051.00
SECRETARIA DE INFRAESTRUCTURA
PRECIOS DE REFERENCIA PARA EL DEPARTAMENTO DEL CESAR
ANALISIS DE PRECIOS UNITARIOS DE REFERENCIA PARA EL
DEPARTAMENTO DEL CESAR
Calle 16 No 12 - 120 - Telefax: (5) 5749671 - e-mail:
obras@gobcesar.gov.co - Valledupar, Cesar.
FACTOR (%): 0
UN 2,318,337.00
SECRETARIA DE INFRAESTRUCTURA
PRECIOS DE REFERENCIA PARA EL DEPARTAMENTO DEL CESAR
ANALISIS DE PRECIOS UNITARIOS DE REFERENCIA PARA EL
DEPARTAMENTO DEL CESAR
Calle 16 No 12 - 120 - Telefax: (5) 5749671 - e-mail:
obras@gobcesar.gov.co - Valledupar, Cesar.
FACTOR (%): 0
FACTOR (%): 0
TRANSPORTE % - 354,794.82 -
HERRAMIENTAS MENORES %MO 0.03 33,242.83 997.28
MANO DE OBRA DD hc 1.06 31,361.16 33,242.83
SECRETARIA DE INFRAESTRUCTURA
PRECIOS DE REFERENCIA PARA EL DEPARTAMENTO DEL CESAR
ANALISIS DE PRECIOS UNITARIOS DE REFERENCIA PARA EL
DEPARTAMENTO DEL CESAR
Calle 16 No 12 - 120 - Telefax: (5) 5749671 - e-mail:
obras@gobcesar.gov.co - Valledupar, Cesar.
FACTOR (%): 0
TRANSPORTE % - 214,814.54 -
HERRAMIENTAS MENORES %MO 0.03 23,269.98 698.10
MANO DE OBRA DD hc 0.74 31,361.16 23,269.98
SECRETARIA DE INFRAESTRUCTURA
PRECIOS DE REFERENCIA PARA EL DEPARTAMENTO DEL CESAR
ANALISIS DE PRECIOS UNITARIOS DE REFERENCIA PARA EL
DEPARTAMENTO DEL CESAR
Calle 16 No 12 - 120 - Telefax: (5) 5749671 - e-mail:
obras@gobcesar.gov.co - Valledupar, Cesar.
FACTOR (%): 0
TRANSPORTE % - 208,229.44 -
HERRAMIENTAS MENORES %MO 0.03 23,269.98 698.10
SECRETARIA DE INFRAESTRUCTURA
PRECIOS DE REFERENCIA PARA EL DEPARTAMENTO DEL CESAR
ANALISIS DE PRECIOS UNITARIOS DE REFERENCIA PARA EL
DEPARTAMENTO DEL CESAR
Calle 16 No 12 - 120 - Telefax: (5) 5749671 - e-mail:
obras@gobcesar.gov.co - Valledupar, Cesar.
FACTOR (%): 0
TRANSPORTE % - 24,916.80 -
HERRAMIENTAS MENORES %MO 0.03 12,544.46 376.33
MANO DE OBRA D.D UN 0.40 31,361.16 12,544.46
FACTOR (%): 0
TRANSPORTE % - 167,040.00 -
HERRAMIENTAS MENORES %MO 0.03 33,242.83 997.28
MANO DE OBRA DD INSTALACION hc 1.06 31,361.16 33,242.83
SECRETARIA DE INFRAESTRUCTURA
PRECIOS DE REFERENCIA PARA EL DEPARTAMENTO DEL CESAR
ANALISIS DE PRECIOS UNITARIOS DE REFERENCIA PARA EL
DEPARTAMENTO DEL CESAR
Calle 16 No 12 - 120 - Telefax: (5) 5749671 - e-mail:
obras@gobcesar.gov.co - Valledupar, Cesar.
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
DESPERDICIO % - 274,585.55 -
TRANSPORTE % - 274,585.55 -
HERRAMIENTAS MENORES %MO 0.03 50,961.88 1,528.86
MANO DE OBRA D.D h-h 1.50 33,974.59 50,961.88
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
XV ACABADOS Y PINTURAS
388 LACA TRANSPARENTE SOBRE MADERA M2 16,947.00
SELLADOR M 140 O SIMILAR gl 0.02 51,543.00 1,030.86
DISOLVENTE THINNER PINTUCO O SIMILAR gl 0.02 83,427.00 1,668.54
LIJA DE AGUA 965 SUPER UN 1.00 1,300.00 1,300.00
LACA TRANSPARENTE MATE PRIMERA CALIDAD gl 0.04 45,553.00 1,822.12
DESPERDICIO % 0.05 5,821.52 291.08
TRANSPORTE % - 6,112.60 -
HERRAMIENTAS MENORES %MO 0.03 10,519.05 315.57
MANO DE OBRA CC hc 0.35 30,054.44 10,519.05
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
TRANSPORTE % - 81,084.00 -
HERRAMIENTAS MENORES %MO 0.03 31,622.50 948.68
MANO DE OBRA BB hc 1.10 28,747.73 31,622.50
FACTOR (%): 0
TRANSPORTE % - 113,664.92 -
HERRAMIENTAS MENORES %MO 0.03 24,378.07 731.34
MANO DE OBRA BB hc 0.85 28,747.73 24,378.07
SECRETARIA DE INFRAESTRUCTURA
PRECIOS DE REFERENCIA PARA EL DEPARTAMENTO DEL CESAR
ANALISIS DE PRECIOS UNITARIOS DE REFERENCIA PARA EL
DEPARTAMENTO DEL CESAR
Calle 16 No 12 - 120 - Telefax: (5) 5749671 - e-mail:
obras@gobcesar.gov.co - Valledupar, Cesar.
FACTOR (%): 0
FACTOR (%): 0
TRANSPORTE % - 214,600.00 -
HERRAMIENTAS MENORES %MO 0.03 5,749.55 172.49
MANO DE OBRA BB hc 0.20 28,747.73 5,749.55
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
TUBO GALVANIZADO CERRAMIENTO 2 1/2"X 2.3MM ML 0.50 35,224.00 17,612.00 38,173.33 211,344.00
MALLA ESLABONADA 60 MM X 2.00 M2 1.00 28,873.88 28,873.88
SOLDADURA GB 0.30 2,000.00 600.00
CONCRETO 1:2:3 ELABORADO EN OBRA M3 0.02 342,388.00 8,217.31
SECRETARIA DE INFRAESTRUCTURA
PRECIOS DE REFERENCIA PARA EL DEPARTAMENTO DEL CESAR
ANALISIS DE PRECIOS UNITARIOS DE REFERENCIA PARA EL
DEPARTAMENTO DEL CESAR
Calle 16 No 12 - 120 - Telefax: (5) 5749671 - e-mail:
obras@gobcesar.gov.co - Valledupar, Cesar.
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
UND 2.00 -
Baranda concavo de 2.00mt de tubo galvanizado de
Ø1 ½” - long. Aproximada 2.00mt x 3un,
UND 2.00 -
SECRETARIA DE INFRAESTRUCTURA
PRECIOS DE REFERENCIA PARA EL DEPARTAMENTO DEL CESAR
ANALISIS DE PRECIOS UNITARIOS DE REFERENCIA PARA EL
DEPARTAMENTO DEL CESAR
Calle 16 No 12 - 120 - Telefax: (5) 5749671 - e-mail:
obras@gobcesar.gov.co - Valledupar, Cesar.
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
FACTOR (%): 0
EQUIPOS
ANDAMIOS DIA 928.00
CERCHAS METALICAS DIA 208.80
PARALES METALICOS 3 Y 4MT DIA 208.80
TABLONES DIA 522.00
TABLERO DE MADERA .70 X 1.40 (CHAZAS) DIA 266.80
GUARDERAS .40 X 1.40 DIA 232.00
TABLEROS PARA MUROS .40 X 1.45 DIA 638.00
CORTADORA PAVIMENTO 5CM ML 5,800.00
MEZCLADORA, RANA, VIBRADOR, MOTOBOMBA DIA 92,800.00
SIN OPERADOR
GOBERNACION DEL CESAR
SECRETARIA DE INFRAESTRUCTURA
PRECIOS DE REFERENCIA PARA EL DEPARTAMENTO DEL CESAR
Calle 16 No 12 - 120 - Telefax: (5) 5749671 - e-mail:
obras@gobcesar.gov.co - Valledupar, Cesar.
FECHA: DE 2.021
CONTRATISTA:
MEZCLADORA, RANA, VIBRADOR, MOTOBOMBA
DIA 92,800.00
CON OPERADOR
FORMALETA METALICA COLUMNA CIRCULAR Ø .2
DIA 22,968.00
A .3 LONG. 3.00MT
FORMALETA METALICA COLUMNA CIRCULAR Ø .4
DIA 44,000.00
A .5 LONG. 3.00MT
FORMALETA METALICA COLUMNA CIRCULAR Ø .6
DIA 55,000.00
LONG. 3.00MT
FORMALETA METALICA COLUMNA CUADRADA
DIA 15,312.00
HASTA .40 X .40 LONG. 2.90MT
COSTO ADICIONAL BOMBEO M3 42,920.00
RIEL PAVIMENTO 3ML DIA 1,276.00
TALADRO DEMOLEDOR HR 25,520.00
MANO DE OBRA
MANO DE OBRA AA-ALBAÑILERIA HC 26,134.30
MANO DE OBRA BB-PLOMERIA Y ELECTRICAS HC 28,747.73
MANO DE OBRA CC-PINTURA HC 30,054.44
MANO DE OBRA DD-CARPINTERIA MADERA Y HC 31,361.16
METAL.
CUADRILLA "EE" (CABLEADO ESTRUCTURAL) HC 33,974.59
JORNAL DIARIO AYUDANTE DIA 76,980.48
AYUDANTE HR 9,622.56
ANALISIS BASICOS
MORTERO 1:3 M3 329,952.00
CEMENTO GRIS kg 454.00 516.00 234,264.00
AGUA lt 220.00 65.00 14,300.00
ARENA M3 1.30 51,170.00 66,521.00
HERRAMIENTAS MENORES d 0.03 14,433.84 433.02
AYUDANTE ALBAÑILERÍA (A) hr 1.50 9,622.56 14,433.84
MORTERO 1:4 M3 312,180.00
CEMENTO GRIS kg 420.00 516.00 216,720.00
AGUA lt 185.00 65.00 12,025.00
ARENA M3 1.34 51,170.00 68,567.80
HERRAMIENTAS MENORES d 0.03 14,433.84 433.02
AYUDANTE ALBAÑILERÍA (A) hr 1.50 9,622.56 14,433.84
MORTERO 1:5 M3 276,343.00
CEMENTO GRIS kg 350.00 516.00 180,600.00
GOBERNACION DEL CESAR
SECRETARIA DE INFRAESTRUCTURA
PRECIOS DE REFERENCIA PARA EL DEPARTAMENTO DEL CESAR
Calle 16 No 12 - 120 - Telefax: (5) 5749671 - e-mail:
obras@gobcesar.gov.co - Valledupar, Cesar.
FECHA: DE 2.021
CONTRATISTA:
AGUA lt 150.00 65.00 9,750.00
ARENA M3 1.39 51,170.00 71,126.30
HERRAMIENTAS MENORES d 0.03 14,433.84 433.02
AYUDANTE ALBAÑILERÍA (A) hr 1.50 9,622.56 14,433.84
MORTERO 1:4 IMPERMEABILIZADO M3 335,480.00
CEMENTO GRIS kg 420.00 516.00 216,720.00
AGUA lt 185.00 65.00 12,025.00
ARENA M3 1.34 51,170.00 68,567.80
SIKA-1 (20 KG) IMPERMEABILIZANTE INTEGRAL
PARA MORTEROS. IMPERMEABILIZACIÓN kg 3.33 23,300.34
6997.1
HERRAMIENTAS MENORES d 0.03 14,433.84 433.02
AYUDANTE ALBAÑILERÍA (A) hr 1.50 9,622.56 14,433.84
CONCRETO 1:1 1/2:2 ELABORADO EN OBRA M3 406,205.00 360154
CEMENTO GRIS kg 475.00 516.00 245,100.00
AGUA lt 200.00 65.00 13,000.00
ARENA M3 0.56 51,170.00 28,655.20
TRITURADO M3 0.75 86,870.00 65,152.50
MEZCLADORA CON OPERADOR d 0.15 92,800.00 13,920.00
HERRAMIENTAS MENORES d 0.03 39,201.45 1,176.04
AYUDANTE ALBAÑILERÍA (A) hr 1.50 26,134.30 39,201.45
CONCRETO 1:2:2 1/2 ELABORADO EN OBRA-
M3 356,571.00
4.000PSI
CEMENTO GRIS kg 380.00 516.00 196,080.00
AGUA lt 190.00 65.00 12,350.00
ARENA M3 0.60 51,170.00 30,702.00
TRITURADO M3 0.76 86,870.00 66,021.20
MEZCLADORA CON OPERADOR d 0.12 92,800.00 11,040.79
HERRAMIENTAS MENORES d 0.03 39,201.45 1,176.04
AYUDANTE ALBAÑILERÍA (A) hr 1.50 26,134.30 39,201.45
CONCRETO 1:2:2 ELABORADO EN OBRA-4.000PSI
CLASE C M3 376,205.00
PRESTACIONES BASE
Cesantias E 10.00% 1,216,226 10.98%
Intereses Cesantias 12.00% 145,947 1.32%
Vacaciones 15 Dias A 50.00% 454,263 4.11%
Primas 30 Dias C 100.00% 1,014,980 9.20%
OTROS COSTOS
Botas y Overol 82,500 3.00 247,500 4.09%
Seguro Colectivo D 0.50% 55,269 0.50%
SEGURIDAD SOCIAL
Pensiones D 12.00% 1,326,448 12.00%
Medicina Familiar D 8.50% 939,567 8.50%
Riesgos Profesionales D 5.60% 619,009 5.60%
APORTES SENA
Aporte Ordinario D 2.00% 221,075 2.00%
F.I.C Nota 4 18.00% 229,941 1.80%
OTROS APORTES
I.C.B.F D 3.00% 331,612 3.00%
Subsidio Familiar D 4.00% 442,149 4.00%
NOTAS:
1.- Subsidio de transporte solo se paga hasta sueldos de 2 salarios minimos mensules legales vigentes.
2.- Subsidio de transporte anual = Subsidio mensual / 30 x (365 dias-18 fiestas - 3 permisos- 15 dias
vacaciones).
GOBERNACION DEL CESAR
SECRETARIA DE INFRAESTRUCTURA
PRECIOS DE REFERENCIA PARA EL DEPARTAMENTO DEL CESAR
Calle 16 No 12 - 120 - Telefax: (5) 5749671 - e-mail:
obras@gobcesar.gov.co - Valledupar, Cesar.
FECHA: 2,021
TARIFAS MANO DE OBRA Y PRESTACIONES SOCIALES 2021
3.- Porcentajes solo son validos para actividades de construccion. Para otros empleados se debe utilizar 30
dias de cesantia y 2.2% (promedio para empresas de bajo riesgo).
4.- Un salario minimo por cada 40 trabajadores. El valor se obtiene asi: (Salario minimo x 12 / 40) / Salario
annual estudiado.
5.- El crecimiento promedio del PIB entre 2005 y 2006 fue superior al 4%y por ello la cotizacion a pensiones
por parte del patrono durante 2009 debe aumentar al 12%, segun lo dispuesto por la ley 297 del 2003.
* Todos los porcentajes estan relacionados con el salario para 365 dias.
* Los 18 feriados hacen referencia a los dias feriados que de lunes a viernes tendra 2009.
NOTAS:
Los factores de sobrecostos se utilizan para valorizar el tiempo efectivo que un obrero dedica a su labor y
refleja el costo del tiempo durante el cual no esta trabajando pero si esta devengando.
Si se toma como base la hora calendario, se incrementa 24.57% para obtener la hora efectiva.
Si se toma como base la hora laboral, se incrementa 6.83% para obtener la hora efectiva.
CALCULO DE CUADRILLAS
NOTAS:
Jornal = sueldo mensual x 12 meses / 365 dias.
6045617
663,808.75
556200
6767100
743027.58
0
METRO CUBICO
CANTIDAD DE ARENA, CEMENTO, BALASTO Y RESISTENCIAS QUE SE OBTIENEN
CEMENTO ARENA BALASTO AGUA LITROS A LOS 24 DIAS
MEZCLA KILOS SACOS M3 M3 Agr. Hum. Agr. Sec. KG/CM2 LB/IN2
1.2.2 420 8.5 0.670 0.670 180 200 250 3555
1. 2. 2 1/2 380 7.5 0.600 0.760 170 190 240 3400
1. 2. 3 350 7 0.555 0.835 160 180 220 3130
1. 2. 3 1/2 320 6.5 0.515 0.900 160 180 210 3000
1. 2. 4 300 6 0.475 0.950 145 170 200 2850
1. 2 1/2. 4 280 5.5 0.555 0.830 145 170 190 2700
1. 2 1/2. 4 1/2 260 5.25 0.520 0.940 140 160 180 2560
1. 3. 3 300 6 0.715 0.715 145 170 170 2400
1. 3. 4 280 5.25 0.625 0.825 140 165 160 2280
1. 3. 5 230 4.5 0.555 0.975 135 160 140 2000
1. 3. 6 210 4 0.500 1,000 130 155 120 1700
1. 4. 7 175 3.5 0.555 0.975 120 145 110 1560
1. 4. 8 160 3.25 0.655 1,025 110 140 100 1420
En redes de Gas:
Diámetro de la tubería Ancho de zanja (m)
20 mm a 180 mm 0,40
200 m a 315 mm 0,60
Para diámetros mayores a los contemplados en estas tabla, el ancho de la zanja será igual al
diámetro exterior de la tubería más 0,40 m a cada lado. Para las domiciliarias de acueducto y
gas se utilizará un ancho de zanja de 0,40 m.
El ancho de las excavaciones se incrementará cuando se requiera entibado de acuerdo con el
espesor determinado para éste.
Cuando se presenten derrumbes la Interventoría definirá el tipo de cimentación a utilizar de
acuerdo con las nuevas condiciones de la zanja.
1.1.2. Profundidad de las Zanjas. Las zanjas para la colocación de las tuberías de redes de
servicios tendrán las profundidades indicadas en los planos, incluyendo las requeridas para la
cimentación. Cuando en la ejecución de las zanjas se emplee equipo mecánico, las
excavaciones se llevarán hasta una cota de 0,20 m por encima de la indicada en los planos.
Se excavará el resto por medios manuales y en forma cuidadosa, para no alterar el suelo de
fundación y nivelar el fondo de la excavación, de tal manera que la distribución de esfuerzos
sea uniforme en la superficie de apoyo del tubo y evitar que éste quede sometido a esfuerzos
de flexión.
Si los materiales encontrados a las cotas especificadas de colocación de las tuberías no son
aptos para la instalación de las mismas, la excavación se llevará hasta la profundidad indicada
por la Interventoría, quien también definirá el material de apoyo a utilizar. Esta sobreexcavación
y entresuelo se medirán y pagarán de acuerdo con los ítems correspondientes.
Las excavaciones en roca se llevarán hasta una cota de por lo menos 0,10 m por debajo de la
indicada en los planos, el volumen adicional excavado se llenará con material seleccionado que
sirva de apoyo uniforme y adecuado. Los precios de estas actividades se pagarán en los ítems
respectivos.
PULGADAS MILIMETROS
1/8" 2.5
3/16" 4.5
1/4" 6.0