DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. % ANT. % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
CEMENTO
1415010104
Factura No. 132897052
CEMENTO 200 200 $15,357.00 $3,071,400 un 0% 100% $ 3,071,400
SUB - TOTAL $3,071,400 0% 100% $ 3,071,400
I.V.A. (%) 19% $583,566.00 $583,566.00 100% 100% $ 583,566.00
TOTAL $3,654,966 100% 100% $3,654,966
CONCRETO
1415010103
Factura No. 132868389
C.PLASTICO 3000PSI TM 1" 17.5 17.5 $344,520.00 $6,029,100 un 0% 100% $ 6,029,100
SERVICIO DE AUTOBOMBA 17.5 17.5 $35,000.00 $612,500
SUB - TOTAL $6,641,600 0% 100% $ 6,641,600
I.V.A. (%) 19% $1,261,904.00 $1,261,904.00 100% 100% $ 1,261,904.00
TOTAL $7,903,504 100% 100% $7,903,504
CONCRETO
1415010103
883678
C.PLASTICO 3000PSI TM 1" 5 5 $289,710.00 $1,448,550 un 0% 100% $ 1,448,550
SUB - TOTAL $1,448,550 0% 100% $ 1,448,550
I.V.A. (%) 19% $275,224.50 $275,224.50 100% 100% $ 275,224.50
TOTAL $1,723,775 100% 100% $1,723,775
CEMENTO
1415010104
Factura No. 132890791
CEMENTO 100 100 $15,357.00 $1,535,700 un 0% 100% $ 1,535,700
SUB - TOTAL $1,535,700 0% 100% $ 1,535,700
I.V.A. (%) 19% $291,783.00 $291,783.00 100% 100% $ 291,783.00
TOTAL $1,827,483 100% 100% $1,827,483
CONCRETO
1415010103
Factura No. 132893093
sevicio de auto bomba 20 20 $35,000.00 $700,000 un 0% 100% $ 700,000
SUB - TOTAL $700,000 0% 100% $ 700,000
I.V.A. (%) 19% $133,000.00 $133,000.00 100% 100% $ 133,000.00
TOTAL $833,000 100% 100% $833,000
CONCRETO
1415010103
Factura No. 132894938
C. plastico 3000 psi 15 15 $294,060.00 $4,410,900 un 0% 100% $ 4,410,900
sevicio de auto bomba 15 15 $35,000.00 $525,000 un 0% 100% $ 525,000
SUB - TOTAL $4,935,900 0% 100% $ 4,935,900
I.V.A. (%) 19% $937,821.00 $937,821.00 100% 100% $ 937,821.00
TOTAL $5,873,721 100% 100% $5,873,721
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. % ANT. % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
Factura N°L4-1117757
PEGNTE LISTO CERAMICA X40 KILOS 6 6 $19,714.00 $118,285 un 0% 100% $ 118,285
PEGNTE LISTO PORCELANATO X40 KILOS 6 6 $25,657.00 $153,942 un 0% 100% $ 153,942
ADMINISTRACION 0% $0.00 100% 100% $ 0.00
IMPREVISTOS 0% $0 100% 100% $ 0.00
UTILIDAD 0% 100% 100% $ 0.00
SUB - TOTAL $272,229 0% 100% $ 272,229
I.V.A. (%) 19% $51,723.51 100% 100% $ 51,723.51
TOTAL $323,952 100% 100% $323,952
VALOR ACTA $0
MENOS RETEFUENTE: -
TOTAL A PAGAR $0
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. % ANT. % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
SUMINISTRO LAVADEROS
FACTURA N° F290-00495660
LAVADERO 60X46 BLANCO 1415010125 6 6 $34,240.00 $205,440 GL 100% 100% $ 205,440
ADMINISTRACION 0% $0.00 0% 0% $ 0.00
IMPREVISTOS 0% $0.00 0% 0% $ 0.00
UTILIDAD 0% $0.00 0% 0% $ 0.00
SUB - TOTAL $205,440 0% 100% $ 205,440.00
I.V.A. (%) 19% $39,033.60 0% 100% $ 39,033.60
TOTAL $244,474 0% 0% $244,474
FACTURA N° F 290-00496294
SIFON P GRIS CON ADAPTADOR NEUTO 14 14 $4,725.00 $66,150 GL 100% 100% $ 66,150
ADMINISTRACION 0% 0% 0% $ 0.00
IMPREVISTOS 0% 0% 0% $ 0.00
UTILIDAD 0% 0% 0% $ 0.00
SUB - TOTAL $66,150 100% 100% $ 66,150
I.V.A. (%) 19% $12,568.50 0% 100% $ 12,568.50
TOTAL $78,719 0% 0% $78,719
SUMINISTRO DE
BLOQUE
FACTURA N° 6293
BLOQUE N° 4
ESTANDAR 1800 1800 $700.00 $1,260,000
BLOQUE N° 4 MEDIO 200 200 $350.00 $70,000
ADMINISTRACION 0% $0.00
IMPREVISTOS 0% $0.00
UTILIDAD 0% $0.00
SUB - TOTAL $1,330,000
I.V.A. (%) 19% $0.00
TOTAL $1,330,000
FACTURA N° 6301
BLOQUE N° 4
ESTANDAR 1800 1800 $700.00 $1,260,000
BLOQUE N° 4 MEDIO 200 200 $350.00 $70,000
ADMINISTRACION 0% $0.00
IMPREVISTOS 0% $0.00
UTILIDAD 0% $0.00
TOTAL $1,330,000
VALOR ACTA
MENOS RETEFUENTE:
TOTAL A PAGAR
RECIBI_______________ _____________
C.C.
OBRA: PUNTA ARENA GIRARDOT
NIT 900399853-3
0% 0% $1,330,000
0% 0% $ 0.00
0% 0% $ 0.00
0% 0% $ 0.00
0% 0% $0
0% 0% $ 0.00
0% 0% $1,330,000
$2,660,000
$ 0.00
$2,660,000.00
$2,660,000.00
$2,660,000
-
$2,660,000
_______________ _____________
Vo.Bo. Obra Vo.Bo.
CONSTRUCCIONES INTELIGENTES EVA SAS OBRA: PUNTA ARENA GIRARDOT
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. % ANT. % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
Suministro de materiales
Factura N° CR22362
POLIN 4X4X3 (1415010134) 12 12 $5,000.0 $60,000 und 0% 100% $ 60,000
ADMINISTRACION 0% $0.00 100% 100% $ 0.00
IMPREVISTOS 0% $0.00 100% 100% $ 0.00
UTILIDAD 0% 100% 100% $ 0.00
SUB - TOTAL $60,000 0% 100% $ 60,000
I.V.A. (%) 0% $ 0.0 100% 100% $ 0.00
TOTAL $60,000 100% 100% $60,000
Factura N° CR22404
POLIN 4X4X3 (1415010134) 12 12 $5,000.0 $60,000 und 0% 100% $ 60,000
VALOR ACTA
MENOS RETEFUENTE:
TOTAL A PAGAR
RECIBI_______________ _______________
C.C. Vo.Bo. Obra
OBRA: PUNTA ARENA GIRARDOT
NIT 800.050.088-3
$10,191,039
$ 7,050,750.00
$3,140,289
$3,140,289.45
$3,140,289.45
-
$3,140,289
____________ _____________
Vo.Bo.
CONSTRUCCIONES INTELIGENTES EVA SAS
Suministro de materiales
factura N°0919
factura N°0918
factura N°0943
VALOR ACTA
MENOS RETEFUENTE:
TOTAL A PAGAR
RECIBI_______________
C.C.
OBRA: PUNTA ARENA GIRARDOT
NIT 900189945-1
0% $0.00
$444,000
$444,000
$444,000
$444,000
_______________ _____________
Vo.Bo. Obra Vo.Bo.
CONSTRUCCIONES INTELIGENTES EVA SAS
VALOR ACTA
MENOS RETEFUENTE:
TOTAL A PAGAR
RECIBI_______________ _______________
C.C.
OBRA: PUNTA ARENA GIRARDOT
NIT 800.192.264
$15,583,050
$ 6,547,500.00
$9,035,550.00
$9,035,550.00
$9,035,550
-
$9,035,550
_______________ _____________
Vo.Bo. Obra Vo.Bo.
CONSTRUCCIONES INTELIGENTES EVA SAS OBRA: PUNTA ARENA GIRARDOT
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. % ANT. % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
DESPACHO DE
MATERIALES
FACTURA N° 7282
Bulto de sikakuit
1415010134 3 3 $154,000.00 $462,000 GL 100% 100% $ 462,000
Caco blanco 1415010133 1 1 $26,000.00 $26,000 UN
ADMINISTRACION 0% 0% 0% $ 0.00
IMPREVISTOS 0% 0% 0% $ 0.00
UTILIDAD 0% 0% 0% $ 0.00
SUB - TOTAL $488,000 100% 100% $ 488,000
I.V.A. (%) 19% $92,720.00 0% 100% $ 92,720.00
TOTAL $580,720 0% 0% $580,720
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. % ANT. % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
SUMINISTRO DE MATERIALES
FACTURA No.172551
FACTURA No.210690
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. ANT (UN) % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
ASEO HOLANDA 15 DIAS 4269.54 143.798681845 $6,676.00 $960,000 M2 143.798681845 143.798681845 $ 960,000
ASEO MARCELA 15 DIAS 4269.54 138.5560215688 $6,676.00 $925,000 M2 138.5560215688 138.5560215688 $ 925,000
CORTE
No.9
8/15/2017 CORTE No.10 8/25/2017 TOTAL EJECUTADO TOTAL POR EJECUTAR
ITEM COD DESCRIPCION UND CANT. VR. UNIT VR. TOTAL
CANT. VR. TOTAL % CANT. VR. TOTAL % CANT. VR. TOTAL % CANT. VR. TOTAL
M.O PORCELANATO ALCOBAS M2 1095 15,500.00 16,974,050 73.00 1,131,500.00 50.21 778,255.00 1,095.10 $ 16,974,050.00 100.00% 0.00 $ -
M.O. Ceramica Hall M2 197 15,500.00 3,053,500 0.00 51.00 790,500.00 206.00 $ 3,193,000.00 104.57% -9.00 $ (139,500.00)
Ajuste M.O Porcelanato Alcobas M2 33 921.00 30,393 0.00 0.00 0.00 $ - 0.00% 33.00 $ 30,393.00
M.O. Enchape Escaleras m2 106 15,500.00 1,636,800 0.00 0.00 105.60 $ 1,636,800.00 100.00% 0.00 $ -
Afinado de pisos en morteros H-2.4 CM Aprox m2 300 9,600.00 2,880,000 27.00 259,200.00 0.00 202.09 $ 1,940,064.00 67.36% 97.91 $ 939,936.00
Alistado escalera mas gualdera tramo 7 313,000.00 2,191,000 0.00 0.00 6.00 $ 1,878,000.00 85.71% 1.00 $ 313,000.00
Impermeabilizacion zona humeda m2 260 6,000.00 1,560,000 0.00 0.00 123.24 $ 739,440.00 47.40% 136.76 $ 820,560.00
Muros baños m2 488 15,500.00 7,558,265 42.00 651,000.00 0.00 487.63 $ 7,558,265.00 100.00% 0.00 $ -
Muros zona lavanderia. m2 170 14,000.00 2,381,400 0.00 0.00 170.10 $ 2,381,400.00 100.00% 0.00 $ -
Porcelanato Balcones m2 300 15,500.00 4,650,000 104.08 1,613,240.00 0.00 175.96 $ 2,727,380.00 58.65% 124.04 $ 1,922,620.00
Piso baño m2 360 15,500.00 5,580,000 19.18 297,290.00 0.00 255.60 $ 3,961,800.00 71.00% 104.40 $ 1,618,200.00
jornales de oficiales aseo und 11 45,000.00 486,000 0.00 0.00 11.00 $ 495,000.00 101.85% 0.00 $ -
guarda escoba ml 2250 5,438.00 12,235,500 406.70 2,211,634.60 0.00 747.84 $ 4,066,753.92 33.24% 1,502.16 $ 8,168,746.08
media caña balcones m2 235 3,220.00 757,151 143.00 460,460.00 0.00 235.14 $ 757,150.80 100.00% 0.00 $ -
aplicación igol balcones m2 71.88 2,500.00 179,700 0.00 0.00 71.88 $ 179,700.00 100.00% 0.00 $ -
PICADA PISCINA MUROS M2 44.14 4,640.00 204,810 0.00 0.00 38.14 $ 176,969.60 86.41% 6.00 $ 27,840.00
M.O PORCELANATO TERRAZAS M2 362.00 15,500.00 5,611,000 0.00 101.85 1,578,675.00 170.59 $ 2,644,145.00 47.12% 191.41 $ 2,966,855.00
ENCHAPE PISCINA M2 245.00 20,000.00 4,900,000 40.35 807,000.00 0.00 224.01 $ 4,480,200.00 91.43% 20.99 $ 419,800.00
ENCHAPE APARTAMENTO MODELO M2 11.60 15,500.00 179,800 0.00 0.00 11.60 $ 179,800.00 100.00% 0.00 $ -
SOBREPISO APARTAMENTO MODELO M2 13.24 9,600.00 127,104 0.00 0.00 13.24 $ 127,104.00 100.00% 0.00 $ -
PICADA DE PISO APARTAMENTOS MODELOS M2 6.00 3,712.00 22,272 0.00 0.00 6.00 $ 22,272.00 100.00% 0.00 $ -
DESMONTE ENCHAPE APARTAMENTO REF. 4APT 404 UND 1.00 22,050.00 22,050 1.00 22,050.00 0.00 1.00 $ 22,050.00 100.00% 0.00 $ -
ENCHAPE VESTIER AP 404 UND 1.00 37,975.00 37,975 1.00 37,975.00 0.00 1.00 $ 37,975.00 100.00% 0.00 $ -
DESMONTE ENCHAPE APARTAMENTO REF. 4APT 404 UND 1.00 21,780.00 21,780 1.00 21,780.00 0.00 1.00 $ 21,780.00 100.00% 0.00 $ -
ENCHAPE VESTIER AP 406 UND 1.00 37,510.00 37,510 1.00 37,510.00 0.00 1.00 $ 37,510.00 100.00% 0.00 $ -
ENCHAPE PLAYA PISCINA M2 122.00 15,500.00 1,891,000 122.00 1,891,000.00 0.00 122.00 $ 1,891,000.00 100.00% 0.00 $ -
BORDES DE PISCINA M2 0.34 1,700,000.00 578,000 0.34 578,000.00 0.00 0.34 $ 578,000.00 100.00% 0.00 $ -
M.o instalacion rejillas und 319 3,500.00 1,116,500 74.00 259,000 74.00 $ 259,000.00 23.20% 245.00 $ 857,500.00
TOTAL COSTO DIRECTO (SUBTOTAL 1 + SUBTOTAL 2) 76,903,559 $ 10,019,639.60 $ 3,406,430.00 58,966,609 76.68% 17,088,450
ADMINISTRACION 0% 0 0 0
IMPREVISTOS 0% 0 0 0
UTILIDAD 0% 0 0 0
SUBTOTAL 3 76,903,559 $ 10,019,639.60 $ 3,406,430.00 58,966,610 17,088,450
IVA SOBRE UTILIDAD 0% 0 0 0
TOTAL 76,903,559 $ 10,019,639.60 $ 3,406,430.00 58,966,610 17,088,450
AMORTIZACION DE ANTICIPO 10% 0
RETEGARANTÍA 10% $ 1,001,963.96 $ 340,643.00 2,598,453
Fact No. Cr18293
Descuento por ferreteria. Factura. No.
VALOR TOTAL 76,903,559.40 $ 9,017,675.64 $ 3,065,787.00 56,368,157 17,088,450
OBSERVACIONES: RESUMEN ANTICIPO RESUMEN RETEGARANTÍA
SOBRE LA UTILIDAD
CORTE No.01: 689,983
CORTE No.02: 638,404
ANTICIPO: CORTE No 03 939,208
CORTE No. 04: 620,395
2,000,000
CORTE No 05 716,512
Solicitud de Pago No 643
FECHA : FECHA: Agosto 25DE 2017
CODIGO OBRA: 7-10
CONTRATISTA: GONZALO NAVARRO LARA CODIGO: 1415010121
TOTAL COSTO DIRECTO (SUBTOTAL 1 + SUBTOTAL 2) 151,447,449 $ 16,936,933.35 103,726,857 40.69% 47,720,593 40.69%
ADMINISTRACION 10% 15,144,745 1,693,693 10,372,686 4,772,059
IMPREVISTOS 10% 15,144,745 1,693,693 10,372,686 4,772,059
UTILIDAD 5% 7,572,372 846,847 5,186,343 2,386,030
SUBTOTAL 3 189,309,312 $ 21,171,980.94 129,658,571 59,650,741
IVA SOBRE UTILIDAD 19% 1,438,751 160,907 985,405 453,346
TOTAL 190,748,062 21,332,888 130,643,976 60,104,086
AMORTIZACION DE ANTICIPO 50% 10,666,034 46,707,519 29,825,370
RETEGARANTÍA 10% 2,117,117 9,353,014 5,965,074
RETEFUENTE
VALOR TOTAL 190,748,062.38 8,549,737 74,583,443 24,313,642
OBSERVACIONES: RESUMEN ANTICIPO RESUMEN RETEGARANTÍA
SOBRE LA UTILIDAD
CORTE No.01: 3,163,929
CORTE No.02: 3,125,254
ANTICIPO: CORTE No 03 1,526,070
CORTE No. 04: 1,537,761
95,374,030
CORTE No 05 1,507,295
AMORTIZACION: CORTE No. 06 2,117,117
CORTE No 07
REEMBOLSO
64,967,306 RETEGRANTIA
SEGUNDO ANTICIPO DE
OBRA DIVISIONES DE BAÑO
Divisiones de Baño
1 1 $61,229,103.00 $61,229,103
ADMINISTRACION 0% $0.00
IMPREVISTOS 0% $0.00
UTILIDAD 0% $0.00
SUB - TOTAL $61,229,103
I.V.A. (%) 19%
TOTAL $61,229,103
VALOR ACTA
MENOS RETEFUENTE:
TOTAL A PAGAR
RECIBI_______________ _______________
C.C.
OBRA: PUNTA ARENA GIRARDOT
NIT 900575475 -7
$12,245,821
$ 0.00
$12,245,820.60
$12,245,820.60
$12,245,821
-
$12,245,821
_______________ _____________
Vo.Bo. Obra Vo.Bo.
CORTE No 07
REEMBOLSO
#REF! RETEGRANTIA
SALDO: #REF! TOTAL #REF!
#REF!
SOLICITUD DE PAGO No. 645
FECHA : FECHA: agosto25 DE 2017
CODIGO OBRA: 7-10
CONTRATISTA: URBANISMO Y MAQUINARIA SAS CODIGO: 1415010141
CajasTapa Fundido80x80.
Inspeccion en sitioTapa UN 3.00 2,000,000.00 6,000,000 0.00 3.00 $ 6,000,000.00 100.00% 0.00 $ -
prefabricada en concreto, sin marco UN 2.00 480,000.00 960,000 0.00 2.00 $ 960,000.00 100.00% 0.00 $ -
RED AGUAS NEGRAS
Excavacion Mecanica, Corte, Cargue y - 0.00 0.00 $ - 0.00 $ -
Transporte INTERNO M3 79.50 16,480.00 1,310,160 0.00 116.91 $ 1,926,676.80 100.00% 0.00 $ -
Suministro e Instalacion CAMA EN ARENA M3 8.94 59,926.00 535,738 0.00 18.86 $ 1,130,204.36 100.00% 0.00 $ -
Suministro e Instalacion Atraque en M3 18.29 49,144.00 898,844 0.00 38.35 $ 1,884,672.40 100.00% 0.00 $ -
SuministroRecebo Fino Mat. De
e Instalacion
Exacavacion
Suministro eCompactado proctor 12"
Instalacion Tuberia 90% M3 21.23 13,983.00 296,859 0.00 67.00 $ 936,861.00 100.00% 0.00 $ -
UNION
Suministro MECANICA
e Instalacion Tuberia 8" ML 39.32 94,564.00 3,718,256 0.00 39.32 $ 3,718,256.48 100.00% 0.00 $ -
UNION MECANICA
Pozo de Inspeccion H menor a 2m. Placa y ML 71.15 45,655.55 3,248,393 0.00 75.10 $ 3,428,732.11 100.00% 0.00 $ -
CajasTapa Fundido80x80.
Inspeccion en sitioTapa UN 1.00 2,000,000.00 2,000,000 0.00 1.00 $ 2,000,000.00 100.00% 0.00 $ -
prefabricada en concreto, sin marco UN 2.00 480,000.00 960,000 0.00 2.00 $ 960,000.00 100.00% 0.00 $ -
RED AGUAS NEGRAS PUBLICA - 0.00 0.00 $ - 200.00% 0.00 $ -
Corte, cargue, retiro y transporte a M3 443.31 9,500.00 4,211,445 310.32 2,948,011.50 0.00 $ - 300.00% 0.00 $ -
interior lote
Suministro e Instalacion Recebo Comun
Compactado
Suministro Proctor
e Instalacion 95% 12"
Tuberia M3 137.22 45,000.00 6,174,900 96.05 4,322,250.00 0.00 $ - 400.00% 0.00 $ -
UNION MECANICA ML 94,680.34 - 0.00 0.00 $ - 500.00% 0.00 $ -
Perforacion y Atraque Pozo Llegada ML 150,000.00 - 0.00 0.00 $ - 600.00% 0.00 $ -
Reparacion Pozo Llegada UN 800,000.00 - 0.00 0.00 $ - 700.00% 0.00 $ -
Geotextil
Subase Granular T2400
SGB-BINV-E-320-13 ML 1025.35 800.00 820,280 717.75 574,196.00 0.00 $ - 800.00% 0.00 $ -
E=105Mpa
Base Granular U=0.40
BGB-B e=0.30m E=210
INV-E-330-13 M3 307.61 77,000.00 23,685,970 215.33 16,580,179.00 0.00 $ - 900.00% 0.00 $ -
Mpa U=0.40
Base asfaltica MDC25 e=0.20m
INV-E-450-13 M3 82,500.00 - 0.00 0.00 $ - 1000.00% 0.00 $ -
MTS,MENOR DEciclopeo
3 +PLACA+FUNDIDA EN m3 3.39 220,000 745,800 0.00 3.39 $ 745,800.00 2100.00% 0.00 $ -
SITIO| UN 1 607,040 607,040 0.00 1.00 $ 607,040.00 2200.00% 0.00 $ -
SUBTOTAL ITEM 63,811,538 29,888,336.50 63,811,538.22 $ -
CORTE CORTE
No.3
12/12/2016
No.4
7/23/2017 CORTE No.5 7/23/2017 TOTAL EJECUTADO TOTAL POR EJECUTAR
ITEM COD DESCRIPCION UND CANT. VR. UNIT VR. TOTAL
CANT. VR. TOTAL % CANT. VR. TOTAL % CANT. VR. TOTAL % CANT. VR. TOTAL % CANT. VR. TOTAL %
1.0 Estructurado Metalico Cielo Raso (lamina ST) M2 600 8,008.00 4,804,800 580.00 $ 4,644,640.00 96.67% 20.00 $ 160,160.00
2.0 Tapado+ dilataciones+perforaciones M2 1799 10,455.00 18,808,545 588.28 6,150,467 321.41 3,360,341.55 81.09 847,846.13 1,874.95 $ 19,602,652.43 104.22% -75.95 $ (794,107.43)
4.0 masillado,desparche 2 piso+ 1a mano de pintura 2 piso M2 426.4 5,688.00 2,425,363 255.26 1,451,918.88 628.50 $ 3,574,908.00 147.40% -202.10 $ (1,149,544.80)
5.0 Estructurado Metalico Cielo Raso (lamina ST) M2 674.47 8,008.00 5,401,156 500.00 4,004,000 127.63 1,022,061.04 47.37 379,338.96 713.43 $ 5,713,147.44 105.78% -38.96 $ (311,991.68)
3.0 masillada + desparche+intura terminada m2 1500 8,005.00 12,007,500 531.48 4,254,497 1,120.08 $ 8,966,240.40 74.67% 379.92 $ 3,041,259.60
estampillado superboard ducto lavanderia und 5 36,569.70 182,849 5.00 182,848.50 0.00 5.00 $ 182,848.50 100.00% 0.00 $ -
SUBTOTAL ITEM 43,630,212 14,408,965 42,501,588.27 $ (1,783,492.23)
TOTAL COSTO DIRECTO (SUBTOTAL 1 + SUBTOTAL 2) 43,630,212 14,408,965 4,565,251 2,679,104 42,501,588 97.41% -1,783,492 -4.09%
ADMINISTRACION 4% 1,745,208 576,359 182,610 107,164 1,700,064 -71,340
IMPREVISTOS 3% 1,308,906 432,269 136,958 80,373 1,275,048 -53,505
UTILIDAD 2% 872,604 288,179 91,305 53,582 -35,670
SUBTOTAL 3 47,556,932 15,705,772 4,976,124 2,920,223 45,476,700 -1,944,007
IVA SOBRE UTILIDAD 19% 165,795 54,754 17,348 0 8,640,573 -6,777
TOTAL 47,722,726 15,760,526 4,993,472 2,920,223 54,117,274 -1,950,784
AMORTIZACION DE ANTICIPO 0 0
RETEGARANTÍA 5% 785,289 248,806 146,011 1,931,493
RETEFUENTE
VALOR TOTAL 47,722,726.39 14,975,237 4,744,665 2,774,212 52,185,780 -1,950,784
OBSERVACIONES: RESUMEN ANTICIPO RESUMEN RETEGARANTÍA
SOBRE LA UTILIDAD
CORTE No.01: 425,077
CORTE No.02: 721,128
ANTICIPO: CORTE No 03 785,289
CORTE No. 04: 248,806
0
CORTE No 05 146,011
AMORTIZACION: CORTE No. 06
CORTE No 07
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. % ANT. % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
ENSAYOS DE CALIDAD
FACTURA N° EA-960
Ensayo de compresion de cilindros 20 20 $6,400.00 $128,000 100% 100% $ 128,000
Transporte para recoger material 2 2 $58,800.00 $117,600 100% 100% $ 117,600
Densidades en terreno con cono de arena 4 4 $44,600.00 $178,400
transporte por viajes densidades 1 1 $58,800.00 $58,800
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. % ANT. % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
RECOLECION DE BASURAS
FACTURA N° FG-29005
MES FACTURADO 01/07/2017 AL
31/07/2017 1 1 $245,054.00 $245,054 GL 100% 100% $ 245,054
ADMINISTRACION 0% $0.00 0% 0% $ 0.00
IMPREVISTOS 0% $0.00 0% 0% $ 0.00
UTILIDAD 0% $0.00 0% 0% $ 0.00
SUB - TOTAL $245,054 0% 0% $0
I.V.A. (%) 19% $0.00 0% 0% $ 0.00
TOTAL $245,054 0% 0% $245,054
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. % ANT. % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
Servicio de Telefonia e
Internet
FACTURA No.
461108701
Servicio de Telefonia e
Internet 1 1 $174,659.00 $174,659 GLB 0% 100% $ 174,659
SUB - TOTAL $174,659 0% 100% $ 174,659
I.V.A. (%) 0% $0.00 100% 100% $ 0.00
TOTAL $174,659 100% 100% $174,659
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. % ANT. % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
Anticipo bomba
eyectora Cuarto
Maquinas Piscina y
Bomba Fuente
Pintura Segunda Mano Todo Costo M2 5860 3,084.41 18,074,658 1,102.31 $ 3,399,975.99 4,757.69 $ 14,674,666.61
Pintura Tercera Mano Todo Costo M2 5860 3,181.78 18,645,217 0.00 $ - 5,860.00 $ 18,645,230.80
Pintura Caja Red Contra Incendio Todo
Costo M2 8 34,066.10 272,529 $ - 8.00 $ 272,528.80
Filos y Dilataciones Todo Costo M2 7580 2,920.05 22,134,006 325.29 949,863.06 1,002.09 $ 2,926,152.90 6,577.91 $ 19,207,826.10
TOTAL COSTO DIRECTO (SUBTOTAL 1 + SUBTOTAL 2) 65,910,576 5,335,914 13,631,188 20.68% 52,827,146 79.32%
ADMINISTRACION 3% 1,977,317 160,077 408,936 1,584,814
IMPREVISTOS 3% 1,977,317 160,077 408,936 1,584,814
UTILIDAD 5% 3,295,529 266,796 681,559 2,641,357
SUBTOTAL 3 73,160,739 5,922,212 15,130,618 58,638,132
IVA SOBRE UTILIDAD 19% 626,150 50,685 129,496 501,858
TOTAL 73,786,890 5,972,897 15,260,114 59,139,990 301248
AMORTIZACION DE ANTICIPO 10% 592,221 2,015,491 608509
RETEGARANTÍA 10% 592,221 2,015,491 404326
DESCUENTO POR ASEO 324009
VALOR TOTAL 4,788,455 11,229,132 59,139,990
OBSERVAC
RESUMEN ANTICIPO RESUMEN RETEGARANTÍA
IONES:
SOBRE LA
UTILIDAD
CORTE No.01: 377,398
### CORTE No.02: 301,249
ANTICIPO: CORTE No 03 608,509
CORTE No. 04: 404,326
4,000,000
CORTE No 05 324,010
AMORTIZACION: CORTE No. 06 592,221
CORTE No 07
REEMBOLSO
2,607,711 RETEGRANTIA
TOTAL COSTO DIRECTO (SUBTOTAL 1 + SUBTOTAL 2) 23,492,214 14,797,224 14,797,224 8.57% 8,694,990 91.43%
ADMINISTRACION 10% 2,349,221 1,479,722 1,479,722 869,499
IMPREVISTOS 4% 939,689 591,889 591,889 347,800
UTILIDAD 3% 704,766 443,917 443,917 260,850
SUBTOTAL 3 27,485,890 17,312,752 17,312,752 10,173,138
IVA SOBRE UTILIDAD 19% 133,906 84,344 84,344 1,932,896
TOTAL 27,619,796 17,397,096 17,397,096 12,106,035
AMORTIZACION DE ANTICIPO 0
RETEGARANTÍA 10% 1,731,275 1,731,275 1,210,603
DESCUENTO POR ASEO
VALOR TOTAL 27,619,796.00 15,665,821 15,665,821 10,895,431
OBSERVACIONES: RESUMEN ANTICIPO RESUMEN RETEGARANTÍA
SOBRE LA UTILIDAD
CORTE No.01: 1,731,275
CORTE No.02:
ANTICIPO: CORTE No 03
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. ANT (UN) % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
CTO-#001
ANTICIPO DE LAVADEROS
PREFABRICADOS 35X50 EN
FIBRA DE VIDRIO 19 19 $54,625.00 $1,037,875 und 100% 50% $ 518,906
ADMINISTRACION 0% $0.00 100% 100% $ 0.00
IMPREVISTOS 0% $0.00 100% 100% $ 0.00
UTILIDAD 0% $0.00 100% 100% $ 0.00
SUB - TOTAL $1,037,875 0% 100% $ 518,906
I.V.A. (%) 19% $197,196.25 100% 100% $ 98,592.21
TOTAL $1,235,071 100% 100% $617,499
TOTAL COSTO DIRECTO (SUBTOTAL 1 + SUBTOTAL 2) 113,649,387 14,803,245 64,873,169 8.57% 74,558,285 91.43%
ADMINISTRACION 10% 11,364,939 1,480,325 6,487,317 7,455,829
IMPREVISTOS 4% 4,545,975 592,130 2,594,927 2,982,331
UTILIDAD 3% 3,409,482 444,097 1,946,195 2,236,749
SUBTOTAL 3 132,969,783 17,319,797 75,901,608 87,233,193
IVA SOBRE UTILIDAD 19% 647,802 84,378 369,777 16,574,307
TOTAL 133,617,584 17,404,175 76,271,385 103,807,500
AMORTIZACION DE ANTICIPO 15% 15,000,000 2,597,969 7,604,148 15,571,125
RETEGARANTÍA 10% 1,731,980 3,930,259 10,380,750
DESCUENTO POR ASEO
VALOR TOTAL 118,617,584.04 13,074,226 64,736,978 77,855,625
OBSERVACIONES: RESUMEN ANTICIPO RESUMEN RETEGARANTÍA
SOBRE LA UTILIDAD
CORTE No.01: 1,139,173
CORTE No.02: 2,791,086
ANTICIPO: CORTE No 03 2,499,360
0.00 CORTE No. 04: 1,731,980
15,000,000
CORTE No 05
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. ANT (UN) % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
Factura No 546264
COCINA A GAS DE 4 PUESTOS 20 20 $541,440.00 $10,828,800 und 20 $ 10,828,800
HORNO ESTATICO. Long. 60cm. 20 20 $371,712.00 $7,434,240 und 20 $ 7,434,240
ADMINISTRACION 0% $0.00 100% 100% $ 0.00
IMPREVISTOS 0% $0.00 100% 100% $ 0.00
UTILIDAD 0% $0.00 100% 100% $ 0.00
SUB - TOTAL $18,263,040 0% 100% $ 18,263,040
I.V.A. (%) 19% $3,469,977.60 100% 100% $ 3,469,977.60
TOTAL $21,733,018 100% 100% $21,733,018
TOTAL A PAGAR $0
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. % ANT. % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. % ANT. % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
ANTICPO ELABORACION
DE PUERTAS DE
SEGURIDAD
CUENTA COBRO N° 11-08-
2017
PUERTAS DE SEGURIDAD 3 3 $2,700,000.00 $8,100,000 GL 50% 50% $ 4,050,000
ADMINISTRACION 0% $0.00 0% 0% $ 0.00
IMPREVISTOS 0% $0.00 0% 0% $ 0.00
UTILIDAD 0% $0.00 0% 0% $ 0.00
SUB - TOTAL $8,100,000 0% 0% $0
I.V.A. (%) 19% $0.00 0% 0% $ 0.00
TOTAL $8,100,000 0% 0% $4,050,000
DESCRIPCIÓN N° FACURA CANTIDAD CANTIDAD VALOR VALOR UN. % ANT. % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
CAJA MENORN 19
ENVIA MENSAJERIA Y MERCANCIAS 017002467866 1 1 $ 30,720.00 $30,720 und 0% 100% $ 30,720
JORGE CONDE CTA COBRO 24/07/2017 1 1 $ 7,000.00 $7,000 und 0% 100% $ 7,000
MISELANEA LA 24 3209 1 1 $ 1,200.00 $1,200 und 0% 100% $ 1,200
ESTACION DE SERVIVIO ENESTADIO 000531170 1 1 $ 6,000.00 $6,000 und 0% 100% $ 6,000
PAPELERIA PARKER G 172466 1 1 $ 23,017.00 $23,017 und 0% 100% $ 23,017
AUROS COPIAS S.A D2 15024 1 1 $ 27,300.00 $27,300 und 0% 100% $ 27,300
AUROS COPIAS S.A D1 20017 1 1 $ 3,100.00 $3,100 und 0% 100% $ 3,100
SERVICIOS DE POSTALES NACIONALES S.A 1277-25705 1 1 $ 7,500.00 $7,500 $ 7,500
HOME CENTER 20-01-3270 1 1 $ 22,900.00 $22,900 und 0% 100% $ 22,900
AUROS COPIAS S.A F1 38940 1 1 $ 37,107.00 $37,107 und 0% 100% $ 37,107
ANGELA BERNATE 30547 1 1 $ 17,600.00 $17,600 und 0% 100% $ 17,600
FERRECOLMENA 29497 1 1 $ 45,000.00 $45,000 und 0% 100% $ 45,000
DIEGO PIRA 003 1 1 $ 27,000.00 $27,000 und 0% 100% $ 27,000
CESAR CAMARGO 001 $ 4,000.00 $4,000 und 0% 100% $ 4,000
$0 $0
VALOR ACTA
MENOS RETEFUENTE:
TOTAL A PAGAR
RECIBI_______________ _______________
C.C. Vo.Bo. Obra
CONSTRUCCIONES INTELIGENTES EVA SAS OBRA: PUNTA ARENA GIRARDOT
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. % ANT. % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
ANTICIPO DE CONTRATO
SUMINISTRO E INSTALACION DE
GRANITO Y MARMOL
CTA N°
ANTICIPO DE CONTRATO SUMINISTR 1 1 $65,614,937.93 $65,614,938 und 0% 100% $ 65,614,938
ADMINISTRACION 0% $0.00 100% 100% $ 0.00
IMPREVISTOS 0% $0.00 100% 100% $ 0.00
UTILIDAD 10% $6,561,493.79 100% 100% $ 6,561,493.79
SUB - TOTAL $72,176,432 0% 100% $ 72,176,432
I.V.A. (%) 19% $1,246,683.82 100% 100% $ 1,246,683.82
TOTAL $73,423,116 100% 30% $22,026,935
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. % ANT. % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
1
FACTURA No. BT-174177
BENEFICIARIO
CC DIAS SALARIO BASICO MES NOMINA SUB/TRANSP. SUB/VIVIENDA AFP ARL CAJA LIQUIDACION CONCEPTO
DIRECTOS DE OBRA 12% 7% 4%
EDGAR AVELINO 80,418,936 15 5,650,000 $ 2,825,000 $ - $ 339,000.00 $ 196,620.00 $ 113,000.00 $ - SUELDO + PARAFISCALES $ 3,473,620.00 $ 3,473,620.00
A 15 DE AGOSTO DE 2017
ADMINISTRATIVO $ -
HEIDY CORTES 1.070,603,087 15 1,900,000 $ 950,000 $ - $ 114,000.00 $ 66,120.00 $ 38,000.00 $ - SUELDO + PARAFISCALES $ 1,168,120.00 $ 1,168,120.00
A 15 DE AGOSTO DE 2017
SEGURIDAD IND. $ -
DIANA I. ZABALA R. 39,579,300 15 1,450,000 $ 725,000 $ 41,570.00 $ 87,000.00 $ 50,460.00 $ 29,000.00 $ - SUELDO + PARAFISCALES $ 933,030.00 $ 933,030.00
A 15 DE AGOSTO DE 2017
OPERATIVO $ -
JOSE ROJAS DIAZ 12.192.223 15 2,400,000 $ 1,200,000 $ - $ 144,000.00 $ 83,520.00 $ 48,000.00 $ - SUELDO + PARAFISCALES $ 1,475,520.00 $ 1,475,520.00
A 15 DE AGOSTO DE 2017
ALMACENISTA $ -
CESAR CAMARGO 80.027.571 15 1,550,000 $ 775,000 $ 25,000.00 $ 100,000.00 $ 93,000.00 $ 53,940.00 $ 31,000.00 SUELDO + PARAFISCALES $ 1,077,940.00 $ 1,077,940.00 11% $ 21,558.80 ### $ 4,096.17
A 15 DE AGOSTO DE 2017
Prestacion de Servicios a
PATRICIA DELGADO 63.317.903 15 4,300,000 $ 2,150,000 $ - $ - $ - $ - $ 2,150,000.00 $ 2,150,000.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
15 de Agosto de 2017
OFICIAL $ -
SUELDO + PARAFISCALES
Diego Pira Agudelo 1.010.164.671 15 1,600,000 $ 800,000 $ - $ 100,000.00 $ 96,000.00 $ 55,680.00 $ 32,000.00 $ 1,083,680.00 $ 1,083,680.00 11% $ 21,558.80 ### $ 4,096.17
A 15 DE AGOSTO DE 2017
#REF!
MENOS ABONOS ANTERIORES #REF!
MENOS 10 % RETENCION GARANTIA
VALOR PRESENTE ACTA $11,361,910.00
ADMINISTRACION PROCESOS OBRA CIVIL $ 227,238.20
IVA 19%/ADMON PROCESOS $43,175.26
CONCEPTO: Contrato M.O Instalacion Muebles de cocina de aptos según detalle de plano y medidas
RELACION DE PAGO Nº 45
NIT : 830,509,964.00
Contrato M.O Instalacion Muebles de cocina de aptos según detalle de p
CONSTRUCCIONES INTELIGENTES EVA CODIGO 1415010125
Nit 900.144.205-6
Proyecto: Punta Arena Girardot
Director de obra:
FACTURA No
CORTE No.1 8/15/2017 TOTAL EJECUTADO TOTAL POR EJECUTAR
ITEM COD DESCRIPCION UND CANT. VR. UNIT VR. TOTAL
CANT. VR. TOTAL % CANT. VR. TOTAL % CANT. VR. TOTAL %
4 Tipo K4 muebles un 5 4,355,000 21,775,000 1.00 4,355,000.00 1.00 $ 4,355,000.00 20.00% 4.00 $ 17,420,000.00
5 Tipo K5 muebles un 5 5,089,500 25,447,500 2.00 10,179,000.00 2.00 $ 10,179,000.00 40.00% 3.00 $ 15,268,500.00
6 Tipo K6 muebles un 5 4,355,000 21,775,000 1.00 4,355,000.00 1.00 $ 4,355,000.00 20.00% 4.00 $ 17,420,000.00
7 Tipo K7 muebles un 5 4,355,000 21,775,000 2.00 8,710,000.00 2.00 $ 8,710,000.00 40.00% 3.00 $ 13,065,000.00
8 Tipo K1 brazos hidraulicos un 5 129,710 648,550 0.00 $ - 0.00% 5.00 $ 648,550.00
9 Tipo K2 brazos hidraulicos un 5 129,710 648,550 0.00 $ - 0.00% 5.00 $ 648,550.00
TOTAL COSTO DIRECTO (SUBTOTAL 1 + SUBTOTAL 2) 165,900,100 49,718,500 49,718,500 29.97% 116,181,600 70.03%
ADMINISTRACION 7% 11,613,007 3,480,295 3,480,295 8,132,712
IMPREVISTOS 5% 8,295,005 2,485,925 2,485,925 5,809,080
UTILIDAD 5% 8,295,005 2,485,925 2,485,925 5,809,080
SUBTOTAL 3 194,103,117 58,170,645 58,170,645 135,932,472
IVA SOBRE UTILIDAD 19% 1,576,051 472,326 472,326 1,103,725
TOTAL 195,679,168 58,642,971 58,642,971 137,036,197
AMORTIZACION DE ANTICIPO 50% 98,000,000 29,321,485 29,321,485
RETEGARANTÍA 10% 5,817,065 7,009,022
Fact No. Cr18293
0 0
VALOR TOTAL 97,679,167.95 23,504,421 22,312,464 137,036,197
OBSERVACIONES: RESUMEN ANTICIPO RESUMEN RETEGARANTÍA
SOBRE LA UTILIDAD
CORTE No.01: 5,817,065
CORTE No.02:
ANTICIPO: CORTE No 03
CORTE No. 04:
98,000,000
CORTE No 05
AMORTIZACION: CORTE No. 06
CORTE No 07
29,321,485.0 CORTE No 08
CORTE No 09
ELABORÓ: DIRECTOR DE OBRA SUBCONTRATISTA: SALDO: 68,678,515 TOTAL 5,817,065
SOLICITUD DE PAGO No. 615
FECHA : FECHA: Agosto 15 DE 2017
CODIGO OBRA: 7-10
CONTRATISTA: TITO ANGULO QUIÑONES CODIGO: 1415010148
PAÑETE APARTAMENTO m2 695.97 12,855.00 3,396,111.88 398.63 5,124,388.65 1,094.60 $ 14,071,083.00 -398.63 -$ 5,124,388.65
MAMPOSTERIA INTERIOR BLOQUE N°4 m2 275.976 12,045.00 3,324,130.92 87.02 1,048,155.90 236.37 $ 2,847,076.65 39.61 $ 477,054.27
DILATACIONES DE FACHADA ml 347.40 4,517.00 1,569,205.80 0.00 170.00 $ 767,890.00 177.40 $ 801,315.80
REMATE APAT(REGATAS,TOMA,
CORRIENTE,ETC)
m2 314.55 1,046.00 329,019.30 0.00 0.00 $ - 314.55 $ 329,019.30
REMATE ZONAS COMUNES m2 45.10 1,046.00 47,174.60 0.00 0.00 $ - 45.10 $ 47,174.60
filos (redondeados o rectos) y dilatacion ml 1,088.568 347.59 872,208.19 1,305.19 $ 3,275,115.51 -216.62 -$ 543,569.96
2,509.30 2,731,545.56
cm aprox iterior apartamentos zonas comunes m2 93.48 0.00 146.00 $ 1,212,771.48 -52.52 -$ 436,240.55
8,306.65 776,530.93
resane de placa entrepiso y tuberia electrica un 6.30 0.00 0.00 $ - 6.30 $ 436,099.33
69,222.12 436,099.33
demolicion de placa aligerada duchas un 49.50 37,207.00 167,431.50 0.00 4.00 $ 148,828.00 45.50 $ 1,692,918.50
ajuste pañete apartamento int. m2 266.238 1,918.38 510,745.39 398.63 764,723.43 922.86 $ 1,770,395.26 -656.62 -$ 1,259,649.87
ajuste dilataciones de fachada ml 234.945 1,129.00 265,252.91 0.00 170.00 $ 191,930.00 64.95 $ 73,322.91
muros de contecion m3 15.354 337,458.00 5,181,330.13 0.00 0.00 $ - 15.35 $ 5,181,330.13
mamposteria estructural m2 14.95 29,671.00 443,581.45 0.00 14.95 $ 443,581.45 0.00 $ -
columnetas ml 187.00 21,078.00 274,014.00 35.72 752,906.16 88.80 $ 1,871,726.40 98.20 $ 2,069,859.60
vigas cimentacion ml 0.56 46,725.00 26,166.00 0.00 0.56 $ 26,166.00 0.00 $ -
fachadas pañete m2 68.430 19,130.00 1,309,065.90 113.46 2,170,489.80 498.89 $ 9,543,765.70 -430.46 -$ 8,234,699.80
ACERO FIGURADO MALLA KG 60 4,520 271,200.00 0.00 60.00 $ 271,200.00 0.00 $ -
viga confinamiento mamposteria ml 100 19,165 1,916,500.00 20.30 389,049.50 30.80 $ 590,282.00 69.20 $ 1,326,218.00
viga cerramiento ml 3.6 47,217 169,981.20 0.00 3.60 $ 169,981.20 0.00 $ -
excavacion viga porton m3 2.4 11,652 27,964.80 0.00 2.40 $ 27,964.80 0.00 $ -
M.o y fundida de viga porton m3 0.48 1,130 542.40 0.00 0.48 $ 542.40 0.00 $ -
bordillos edificio ml 54.5 16,522 900,449.00 0.00 82.20 $ 1,358,108.40 -27.70 -$ 457,659.40
picada muros m2 18.52 4,035 74,728.20 0.00 18.52 $ 74,728.20 0.00 $ -
PAÑETE PISICINA m2 60 20,568 1,234,080.00 0.00 60.00 $ 1,234,080.00 0.00 $ -
CARGUE DE PISOS M2 136.33 8,348 1,138,082.84 107.62 898,411.76 243.95 $ 2,036,494.60 -107.62 -$ 898,411.76
ANCLAJES Y EPOXICO UN 40.16 3,230 129,716.80 0.00 40.16 $ 129,716.80 0.00 $ -
FUNDIDA DE PLACA BAÑOS M2 25.76 79,009 2,035,271.84 0.00 25.76 $ 2,035,271.84 0.00 $ -
MANEJO HIERRO KG 244 148 36,112.00 600.00 88,800.00 844.00 $ 124,912.00 -600.00 -$ 88,800.00
DESIMBRE CASETON Y ARREGLO
CARTERAS,FACHADAS M2 43.33 5,217 226,052.61 0.00 43.33 $ 226,052.61 0.00 $ -
BORDILLOS GL 8 56,522 452,176.00 3.50 197,827.00 11.50 $ 650,003.00 -3.50 -$ 197,827.00
meia caña terrazas ml 34.5 4,348 150,006.00 66.00 286,968.00 100.50 $ 436,974.00 -66.00 -$ 286,968.00
demolicion muro m2 1.7 63,565 108,060.50 0.00 1.70 $ 108,060.50 0.00 $ -
fundida de escaleras un 2.95 564,348 1,664,826.60 0.00 1.40 $ 790,087.20 1.55 $ 874,739.40
demolicion placa bordillo m2 1 217,391 217,391.00 0.00 1.00 $ 217,391.00 0.00 $ -
demolicion bordillo con martillo ml 3 9,130 27,390.00 0.00 3.00 $ 27,390.00 0.00 $ -
Demolicion
Demolicion bordillo
viga +placa
de amarre roto un 1 104,348 104,348.00 1 104,348.00 1.00 $ 104,348.00
Excavacion
Dilatacaiones tuberia
de placa agua+ corte
piscina ml 24.42 19,130 467,154.60 24.42 467,154.60 24.42 $ 467,154.60
union placa contrapiso ml 100 2,052 205,200.00 100 205,200.00 100.00 $ 205,200.00
Fundida placa contrapiso+ afinado m2 114.87 29,130 3,346,163.10 114.87 3,346,163.10 114.87 $ 3,346,163.10
Suministro de recebo y compactacion m3 10.08 35,913 362,003.04 10.08 362,003.04 10.08 $ 362,003.04
Dilatacion placa muros contrapiso ml 29.8 4,539 135,262.20 29.8 135,262.20 29.80 $ 135,262.20
Arreglo borde piscina gl 6.6 11,304 74,606.40 6.6 74,606.40 6.60 $ 74,606.40
ESCOTILLA ALFAJOR PARA TANQUE .70X.70 UN 2 220,000.00 440,000 2.00 $ 440,000.00 0.00 $ -
ESCOTILLA ALFAJOR PARA TANQUE 1.00X1.00 UN 1 300,000.00 300,000 1.00 $ 300,000.00 0.00 $ -
VENTANA PERSIANA CUARTO DE MAQUINAS UND 1 180,000.00 180,000 1.00 $ 180,000.00 0.00 $ -
SUMINISTRO ESCALERA GATO 2" UND 3 120,000.00 360,000 2.00 $ 240,000.00 1.00 $ 120,000.00
PUERTA PERSIANA SHUT DE BASURAS UND 1 1,114,400.00 1,114,400 1.00 $ 1,114,400.00 0.00 $ -
- $ -
TOTAL COSTO DIRECTO (SUBTOTAL 1 + SUBTOTAL 2) 17,982,400 $ 3,091,600.00 7,655,400 50.00% 23,384,354 50.00%
ADMINISTRACION 5% 899,120 154,580 382,770 1,169,218
IMPREVISTOS 3% 539,472 92,748 229,662 701,531
UTILIDAD 5% 899,120 154,580 382,770 1,169,218
SUBTOTAL 3 20,320,112 3,493,508 8,038,170 24,553,571
IVA SOBRE UTILIDAD 19% 170,833 29,370 72,726 222,151
TOTAL 20,490,945 3,522,878 8,110,896 24,775,723
AMORTIZACION DE ANTICIPO 40% 2,700,000 9,821,429
RETEGARANTÍA 10% 349,351 803,817 2,455,357
RETEFUENTE |
VALOR TOTAL 20,490,945 3,173,527 4,607,079 12,498,937
OBSERVACIONES: RESUMEN ANTICIPO RESUMEN RETEGARANTÍA
SOBRE LA UTILIDAD
CORTE No.01: 265,324
CORTE No.02: 533,360
ANTICIPO: CORTE No 03 599,736
CORTE No. 04:
2,700,000
CORTE No 05
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. % ANT. % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
Suministro de materiales
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. % ANT. % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
Suministro de materiales
FORMA DE PAGO
Anticipo $ 500,000.00
Alistado Material $ 4,000,000.00
Entrega en Obra $ 800,000.00
CONCEPTO: SUMINISTRO E INSTALACION DE ESCALERAS METALICAS APT, BARANDA PUNTO FIJO Y ESTRUCTURA PORTERIA
RELACION DE PAGO Nº 45
NIT : 931.317.797-1
SUMINISTRO E INSTALACION DE ESCALERAS METALICAS APT, B
CONSTRUCCIONES INTELIGENTES EVA
Nit 900.144.205-6
Proyecto: Punta Arena Girardot
Director de obra:
FACTURA No
CORTE No.1 7/24/2017 CORTE No.2 8/15/2017 TOTAL EJECUTADO TOTAL POR EJECUTAR
ITEM COD DESCRIPCION UND CANT. VR. UNIT VR. TOTAL
CANT. VR. TOTAL % CANT. VR. TOTAL % CANT. VR. TOTAL % CANT. VR. TOTAL %
TOTAL COSTO DIRECTO (SUBTOTAL 1 + SUBTOTAL 2) 21,791,941 2,635,351 1,148,743 3,784,094 50.00% 18,007,847 50.00%
ADMINISTRACION 5% 1,089,597 131,768 57,437 189,205 900,392
IMPREVISTOS 3% 653,758 79,061 34,462 113,523 540,235
UTILIDAD 5% 1,089,597 131,768 57,437 189,205 900,392
SUBTOTAL 3 24,624,893 2,977,947 1,298,087 3,973,298 20,348,868
IVA SOBRE UTILIDAD 19% 207,023 25,036 10,913 35,949 171,075
TOTAL 24,831,917 3,002,982 1,309,000 24,775,723 20,519,942
AMORTIZACION DE ANTICIPO 40% 8,000,000 1,191,179 519,235 1,710,413 8,139,547
RETEGARANTÍA 10% 297,796 129,809 427,605 2,034,887
RETEFUENTE
VALOR TOTAL 24,831,917 1,514,012 659,957 12,498,938 10,345,508
OBSERVACIONES: RESUMEN ANTICIPO RESUMEN RETEGARANTÍA
SOBRE LA UTILIDAD
CORTE No.01: 297,796
CORTE No.02: 129,809
ANTICIPO: CORTE No 03
CORTE No. 04:
8,000,000
CORTE No 05
AMORTIZACION: CORTE No. 06
CORTE No 07
REEMBOLSO
1,710,413 RETEGRANTIA
ducto evacuacion gas UN 66 61,413.45 4,053,288 40.00 2,456,538.17 15.51 952,523 55.51 $ 3,409,060.85 84.11% 10.49 $ 644,227.14
SUBTOTAL ITEM ### 2,456,538.17 952,522.68 3,409,060.85 $ 644,227.14
TOTAL COSTO DIRECTO (SUBTOTAL 1 + SUBTOTAL 2) 4,053,288 2,456,538 952,523 3,409,061 84.11% 644,227 15.89%
ADMINISTRACION 0% 0 0 0 0 0
IMPREVISTOS 0% 0 0 0 0 0
UTILIDAD 5% 202,664 122,827 47,477 170,453 32,211
SUBTOTAL 3 4,255,952 2,579,365 1,000,000 3,579,515 676,438
IVA SOBRE UTILIDAD 19% 38,506 23,337 9,047.620 32,386 6,120
TOTAL 4,294,459 2,602,702 1,009,047 3,611,901 682,559
AMORTIZACION DE ANTICIPO 30% 773,810 300,000 1,073,809
RETEGARANTÍA 10% 257,937 100,905 358,841
RETEFUENTE
VALOR TOTAL 4,294,459 1,570,956 609,047.62 2,179,250 682,559
OBSERVACIONES: RESUMEN ANTICIPO RESUMEN RETEGARANTÍA
SOBRE LA UTILIDAD
CORTE No.01: 257,937
CORTE No.02: 100,905
ANTICIPO: CORTE No 03 0
CORTE No. 04:
1,276,786
CORTE No 05
TOTAL COSTO DIRECTO (SUBTOTAL 1 + SUBTOTAL 2) 46,768,707 23,384,354 14,030,612 $ 2,847,694.63 40,262,661 23,384,354
ADMINISTRACION 0% 0 0 0 0 0 0
IMPREVISTOS 0% 0 0 0 0 0 0
UTILIDAD 5% 2,338,435 1,169,218 701,531 142,385 2,013,133 1,169,218
SUBTOTAL 3 49,107,143 24,553,571 14,732,143 2,990,079 42,275,794 24,553,571
IVA SOBRE UTILIDAD 19% 444,303 222,151 133,291 27,053 8,032,401 222,151
TOTAL 49,551,446 24,775,723 14,865,434 3,017,132 50,308,194 24,775,723
AMORTIZACION DE ANTICIPO 40% 9,821,429 5,892,857 1,196,032 16,910,317
RETEGARANTÍA 10% 2,455,357 1,473,214 299,008 4,227,579
RETEFUENTE
VALOR TOTAL 49,551,446 12,498,937 7,499,362 1,522,093 29,170,298 24,775,723
OBSERVACIONES: RESUMEN ANTICIPO RESUMEN RETEGARANTÍA
SOBRE LA UTILIDAD
CORTE No.01: 2,455,357
CORTE No.02: 1,473,214
ANTICIPO: CORTE No 03 299,008
CORTE No. 04:
19,773,810
CORTE No 05
RELACION DE PAGO Nº 45
NIT : 900641860
CORTE No.1 7/13/2017 CORTE No.2 24/1052017 TOTAL EJECUTADO TOTAL POR EJECUTAR
ITEM COD DESCRIPCION UND CANT. VR. UNIT VR. TOTAL
CANT. VR. TOTAL % CANT. VR. TOTAL % CANT. VR. TOTAL % CANT. VR. TOTAL %
4 Base de limpieza e=5cm M2 25 5,892 147,300.00 0.00 17.40 102,520.80 17.40 $ 102,520.80 7.60 $ 44,779.20
5 Manejo de acero figurado kg 1,393.83 132 183,985.56 7.97 1,052.04 317.83 41,953.56 325.80 $ 43,005.60 1,068.03 $ 140,979.96
6 ColumnetasDintel en bloque
de amarre N|4 manejo
(incluye ml 18 14,223 256,014.00 0.00 6.65 94,582.95 6.65 $ 94,582.95 11.35 $ 161,431.05
7 de acero) ml 90.61 21,334 1,933,073.74 36.14 771,010.76 70.35 1,500,846.90 106.49 $ 2,271,857.66 -15.88 -$ 338,783.92
8 Mamposteria
Vigueta corridaInterior Bloque
de amarre No 4
(incluye m2 100 10,132 1,013,200.00 33.20 336,382.40 78.22 792,525.04 111.42 $ 1,128,907.44 -11.42 -$ 115,707.44
9 manejo de acero) ml 347.9 19,302 6,715,165.80 15.90 306,901.80 50.75 979,576.50 66.65 $ 1,286,478.30 281.25 $ 5,428,687.50
10 Pañete interior aptos m2 100 7,384 738,400.00 33.20 245,148.80 0.00 33.20 $ 245,148.80 66.80 $ 493,251.20
13 Filos (redondeados o rectos) y dilatacion ml 3,000.00 2,540 7,620,000.00 0.00 0.00 0.00 $ - 3,000.00 $ 7,620,000.00
14 Afinado de´pisos en mortero m2 9.38 8,339 78,219.82 0.00 0.00 0.00 $ - 9.38 $ 78,219.82
15 Bordillos de balcones y ventanas ml 54.7 18,551 1,014,739.70 0.00 42.00 779,142.00 42.00 $ 779,142.00 12.70 $ 235,597.70
16 Placa Aerea Aligerada e=50cm m2 64.49 83,509 5,385,495.41 64.49 5,385,495.41 0.00 64.49 $ 5,385,495.41 0.00 $ -
17 muros de contencion y columnas m3 12.23 342,827 4,192,774.21 3.29 1,127,900.83 1.70 582,805.90 4.99 $ 1,710,706.73 7.24 $ 2,482,067.48
18 Ciclopeo m3 15.3 207,103 3,168,675.90 0.00 12.00 2,485,236.00 12.00 $ 2,485,236.00 3.30 $ 683,439.90
21 ajuste pañete int apto M2 100 1,949 194,900.00 33.20 64,706.80 0.00 33.20 $ 64,706.80 66.80 $ 130,193.20
CONCRETO ZARPA M3 5.47 253,320 1,385,660.40 5.47 1,385,660.40 5.47 $ 1,385,660.40 0.00 $ -
RElleno de material excavacion m3 17.26 13,982 241,329.32 17.26 241,329.32 17.26 $ 241,329.32 0.00 $ -
jornales ayudante via dia 10 55,000 550,000.00 10 550,000.00 10.00 $ 550,000.00 0.00 $ -
0.00 $ - 0.00 $ -
TOTAL COSTO DIRECTO (SUBTOTAL 1 + SUBTOTAL 2) 36,326,321 9,755,020 11,073,456 20,828,476 18,210,828
ADMINISTRACION 5% 1,816,316 487,751 553,673 1,041,424 910,541
IMPREVISTOS 4% 1,453,053 390,201 442,938 833,139 728,433
UTILIDAD 4% 1,453,053 390,201 442,938 833,139 728,433
SUBTOTAL 3 41,048,743 11,023,173 12,513,005 23,536,178 20,578,236
IVA SOBRE UTILIDAD 19% 276,080 74,138 84,158 158,296 138,402
TOTAL 41,324,823 11,097,311 12,597,164 23,694,475 20,716,638
AMORTIZACION DE ANTICIPO
RETEGARANTÍA 10% 4,104,874.30 1,102,317 1,251,300.55 2,353,618 2,057,824
RETEFUENTE
VALOR TOTAL 9,994,994 11,345,863 21,340,857 18,658,814
OBSERVACIONES: RESUMEN ANTICIPO RESUMEN RETEGARANTÍA
SOBRE LA UTILIDAD
CORTE No.01: 1,102,317
CORTE No.02: 1,251,301
ANTICIPO: CORTE No 03
CORTE No. 04:
CORTE No 05
DESCRIPCIÓN CANTIDAD CANTIDAD VALOR VALOR UN. % ANT. % ACT. VALOR TOTAL
CONTRAT. EJEC. UNITARIO TOTAL
Suministro de materiales
factura N| pq-1097110
tornillo 6x1 p. aguda 5000 5000 $12.0 $60,000.0 und 0% 100% $ 60,000
tornillo 7x7/16 corto p. aguda 2000 2000 $12.0 $24,000.0 und 0% 100% $ 24,000
lamina de yeso 1/2 "c2.44 45 45 $13,865.0 $623,925.0 und 0% 100% $ 623,925
superplaca rh 1/2"x2.44 5 5 $32,219.0 $161,095.0 und 0% 100% $ 161,095
CUÑETE DURADRYWALL CIELOS TIPO 2 17 17 $64,688.0 $1,099,696.0 und 0% 100% $ 1,099,696
cuñete masilla supermastico gyp 14 14 $24,709.0 $345,926.0 und 0% 100% $ 345,926
RELACION DE PAGO Nº 45
NIT : 900641860
3 Relleno de material selecionado M3 25.74 52,743 1,357,604.82 21.49 $ 1,133,447.07 4.25 $ 224,157.75
4 Base de limpieza e=5cm M2 25 5,892 147,300.00 17.40 $ 102,520.80 7.60 $ 44,779.20
5 Manejo de acero figurado kg 1,393.83 132 183,985.56 325.80 $ 43,005.60 1,068.03 $ 140,979.96
6 Columnetas Dintel en bloque
de amarre N|4 manejo
(incluye ml 18 14,223 256,014.00 6.65 $ 94,582.95 11.35 $ 161,431.05
13 Filos (redondeados o rectos) y dilatacion ml 3,000.00 2,540 7,620,000.00 0.00 $ - 3,000.00 $ 7,620,000.00
14 Afinado de´pisos en mortero m2 9.38 8,339 78,219.82 0.00 $ - 9.38 $ 78,219.82
15 Bordillos de balcones y ventanas ml 54.7 18,551 1,014,739.70 42.00 $ 779,142.00 12.70 $ 235,597.70
16 Placa Aerea Aligerada e=50cm m2 64.49 83,509 5,385,495.41 64.49 $ 5,385,495.41 0.00 $ -
17 muros de contencion y columnas m3 12.23 342,827 4,192,774.21 4.99 $ 1,710,706.73 7.24 $ 2,482,067.48
CONCEPTO: IMPERMEABILIZACION
RELACION DE PAGO Nº 45
NIT : 900,157,983.00
IMPERMEABILIZACION
CONSTRUCCIONES INTELIGENTES EVA
Nit 900.144.205-6
Proyecto: Punta Arena Girardot
Director de obra:
FACTURA No
CORTE No.4 8/15/2017 TOTAL EJECUTADO TOTAL POR EJECUTAR
ITEM COD DESCRIPCION UND CANT. VR. UNIT VR. TOTAL
CANT. VR. TOTAL % CANT. VR. TOTAL % CANT. VR. TOTAL %
Impermeabilizacion Balcones UN 350 21,986.66 7,695,330 0.00 349.00 $ 7,673,343.20 99.71% 1.00 $ 21,986.66
Impermeabilizacion Terrazas UN 360 25,204.22 9,073,518 114.81 2,893,696.07 287.44 $ 7,244,699.92 79.84% 187.37 $ 4,722,514.00
Impermeabilizacion Cubierta UN 325 28,958.04 9,411,362 325.00 $ 9,411,361.61 100.00% 0.00 $ -
Imoermeabilizacion Tanque UN 60 24,667.96 1,480,077 0.00 $ - 0.00% 0.00 $ -
SUBTOTAL ITEM 27,660,287 2,893,696.07 24,329,404.74 $ 4,744,500.66
TOTAL COSTO DIRECTO (SUBTOTAL 1 + SUBTOTAL 2) 27,660,287 $ 2,893,696.07 24,329,405 87.96% 4,744,501
ADMINISTRACION 5% 1,383,014 144,685 1,216,470 237,225
IMPREVISTOS 3% 829,809 86,811 729,882 142,335
UTILIDAD 5% 1,383,014 144,685 1,216,470 237,225
SUBTOTAL 3 31,256,124 $ 3,269,876.56 12,094,947 5,361,286
IVA SOBRE UTILIDAD 19% 262,773 27,490 96,760 45,073
TOTAL 31,518,897 $ 2,893,696.00 12,191,707 5,406,359
AMORTIZACION DE ANTICIPO 30% 980,963 6,769,171
RETEGARANTÍA 10% 249,676 2,263,964
RETEFUENTE
VALOR TOTAL 31,518,896.70 1,663,057 3,158,572 5,406,359
OBSERVACIONES: RESUMEN ANTICIPO RESUMEN RETEGARANTÍA
SOBRE LA UTILIDAD
CORTE No.01: 1,209,495
CORTE No.02: 804,793
ANTICIPO: CORTE No 03 249,676
CORTE No. 04: 249,676
8,699,725
CORTE No 05
AMORTIZACION: CORTE No. 06
CORTE No 07
REEMBOLSO
7,750,134 RETEGRANTIA
CONCEPTO: SUMINISTRO E INSTALACION DE ESCALERAS METALICAS APT, BARANDA PUNTO FIJO Y ESTRUCTURA PORTERIA
RELACION DE PAGO Nº 43
NIT : 931.317.797-1
SUMINISTRO E INSTALACION DE ESCALERAS METALICAS AP
CONSTRUCCIONES INTELIGENTES EVA
Nit 900.144.205-6
Proyecto: Punta Arena Girardot
Director de obra:
FACTURA No
CORTE No.1 7/24/2017 TOTAL EJECUTADO TOTAL POR EJECUTAR
ITEM COD DESCRIPCION UND CANT. VR. UNIT VR. TOTAL
CANT. VR. TOTAL % CANT. VR. TOTAL % CANT. VR. TOTAL %
TOTAL COSTO DIRECTO (SUBTOTAL 1 + SUBTOTAL 2) 21,792,001 2,635,378 2,635,378 50.00% 19,156,623 50.00%
ADMINISTRACION 5% 1,089,600 131,769 131,769 957,831
IMPREVISTOS 3% 653,760 79,061 79,061 574,699
UTILIDAD 5% 1,089,600 131,769 131,769 957,831
SUBTOTAL 3 24,624,961 2,977,977 2,767,147 21,646,984
IVA SOBRE UTILIDAD 19% 207,024 25,036 25,036 181,988
TOTAL 24,831,985 3,003,013 24,775,723 21,828,972
AMORTIZACION DE ANTICIPO 40% 8,000,000 1,191,191 1,191,191 8,658,794
RETEGARANTÍA 10% 297,796 297,796 2,164,698
RETEFUENTE
VALOR TOTAL 24,831,985 1,514,012 12,498,938 11,005,480
OBSERVACIONES: RESUMEN ANTICIPO RESUMEN RETEGARANTÍA
SOBRE LA UTILIDAD
CORTE No.01: 297,796
CORTE No.02:
ANTICIPO: CORTE No 03
CORTE No. 04:
8,000,000
CORTE No 05
FACTURA No
Pintura tipo 2 segunda mano (a todo costo) M2 8366 2,542.98 21,275,038 2,500.00 $ 6,357,460.32 5,866.17 $ 14,917,577.20
Pintura tipo tercera mano (a todo costo) M2 2500 2,646.00 22,136,886 0.00 $ - 2,500.00 6615000
Pintura tuberias en esmalte (a todo costo) ML 1958 3,281.27 6,424,726 0.00 $ - 1,958.00 $ 6,424,726.35
Pintura de caja de red contra incendio (a
todo costo)
UN 12 35,888.89 430,667 0.00 $ - 12.00 $ 430,666.67
PINTURA KORAZA TERRAZA DUPLÑEX M2 600 3,832.11 2,299,266 270.00 1,034,669.70 270.00 $ 1,034,669.70 330.00 $ 1,264,596.30
GUALDERA ETUCO + 1 MANO PINTURA ML 75 3,422.67 256,700 75.00 256,700.25 75.00 $ 256,700.25 0.00 $ -
TOTAL COSTO DIRECTO (SUBTOTAL 1 + SUBTOTAL 2) 166,351,937 $ 7,870,193.75 124,670,971 27.82% 51,680,966 72.18%
ADMINISTRACION 2% 3,327,039 157,404 2,493,419 1,033,619
IMPREVISTOS 1% 1,663,519 78,702 1,246,710 516,810
UTILIDAD 5% 8,317,597 393,510 6,233,549 2,584,048
SUBTOTAL 3 179,660,092 8,499,762 134,644,649 55,815,443
IVA SOBRE UTILIDAD 19% 1,556,062 74,766 1,184,374 490,969
TOTAL 178,455,710 8,574,528 135,829,023 56,306,412
AMORTIZACION DE ANTICIPO 10% 17,845,571 4,500,000 13,464,465 5,581,544
RETEGARANTÍA 10% 849,976 13,464,465 5,581,544
DESCUENTO POR ASEO
VALOR TOTAL 160,610,138.98 3,224,552 108,900,093 45,143,324
OBSERVACIONES: RESUMEN ANTICIPO RESUMEN RETEGARANTÍA
SOBRE LA UTILIDAD
CORTE No.01: 1,621,409
CORTE No.02: 1,621,409
ANTICIPO: CORTE No 03 727,886
5,202,228.37 CORTE No. 04: 1,165,663
17,241,820
CORTE No 05 561,841
AMORTIZACION: CORTE No. 06 699,206
CORTE No 07 485,650
CORTE No 08 400,435
11,442,398 CORTE No 09 990,943
CORTE No 10 849,976
NIT : 900641860
1 Excavacion manual
2 Localizacion y replanteo
3 Relleno de material selecionado
4 Base de limpieza e=5cm
5 Manejo de acero figurado
6 Columnetas Dintel en bloque
de amarre N|4 manejo
(incluye
7 de acero)
8 Vigueta corridaInterior
Mamposteria Bloque
de amarre No 4
(incluye
9 manejo de acero)
10 Pañete interior aptos
13 Filos (redondeados o rectos) y dilatacion
14 Afinado de´pisos en mortero
15 Bordillos de balcones y ventanas
16 Placa Aerea Aligerada e=50cm
17 muros de contencion y columnas
18 Ciclopeo
19 LADRILLO ESTRUCTURAL
20 Concreto mezclado en obra
21 ajuste pañete int apto
SUBTOTAL ITEM
TOTAL COSTO DIRECTO (SUBTOTAL 1 + SUBTOTAL 2)
ADMINISTRACION 5%
IMPREVISTOS 4%
UTILIDAD 4%
SUBTOTAL 3
IVA SOBRE UTILIDAD 19%
TOTAL
AMORTIZACION DE ANTICIPO
RETEGARANTÍA 10%
RETEFUENTE
VALOR TOTAL
OBSERVACIONES:
SOBRE LA UTILIDAD
UCCIONES JC SAS
RA PORTERIA y BOX
7.20 497,390.40
m3 15.48 69,082 1,069,389.36
42.50 122,400.00
m2 42.5 2,880 122,400.00
M3 25.74 52,743 1,357,604.82 17.00 896,631.00
M2 25 5,892 147,300.00 0.00
kg 1,393.83 132 183,985.56 7.97 1,052.04
ml 18 14,223 256,014.00 0.00
ml 90.61 21,334 1,933,073.74 36.14 771,010.76
m2 100 10,132 1,013,200.00 33.20 336,382.40
ml 347.9 19,302 6,715,165.80 15.90 306,901.80
m2 100 7,384 738,400.00 33.20 245,148.80
ml 3,000.00 2,540 7,620,000.00 0.00
m2 9.38 8,339 78,219.82 0.00
ml 54.7 18,551 1,014,739.70 0.00
m2 64.49 83,509 5,385,495.41 64.49 5,385,495.41
m3 12.23 342,827 4,192,774.21 3.29 1,127,900.83
m3 15.3 207,103 3,168,675.90 0.00
m2 30 30,143 904,290.00 0.00
m3 10.57 21,976 232,286.32 0.00
M2 100 1,949 194,900.00 33.20 64,706.80
36,326,321 9,755,020.24
36,326,321 9,755,020
1,816,316 487,751
1,453,053 390,201
1,453,053 390,201
41,048,743 11,023,173
276,080 74,138
41,324,823 11,097,311
4,104,874.30 1,102,317
9,994,994
9,994,989.84
SUBCONTRATISTA:
CODIGO OBRA: 7-10
CODIGO: 1415010148
RELACION DE PAGO Nº 42
9,755,020 26,572,894
87,751 487,751 1,328,645
90,201 390,201 1,062,916
90,201 390,201 1,062,916
,023,173 11,023,173 30,027,371
74,138 74,138 201,954
11,097,311 30,229,325
BENEFICIARIO NIT / C.C. CONCEPTO VALOR ACUMULADO ABONO CODIGO VALOR SOL. DE Vo.Bo. OBSERVACION
CONTRATO CONTRATO CONTRATO ACTIVIDAD A PAGAR PAGO GER.
1415010103
1 ARGOS SAS 890100251-0 Despacho Concreto y cemento $646,574,284 $664,378,287.00 $21,816,449
1415010104
$21,816,449 590
2 CANTER CUND 900.882.137-9 Sum Material Cantera $80,000,000 $74,358,000.00 $6,445,200 1415010101 $6,445,200 591
3 SURTIR MAYORISTA 860.527.709-6 Sum Material Ferreteria $745,013 $0.00 $745,013 1415010105 $745,013 592
4 CONTECON URBAR 830.043.424-5 Ensayos $24,000,000 $13,207,335.00 $574,532 1415010110 $574,532 593
5 TODACO SAS 830.102.080-9 Sum Encjhape + Aparatos Sanitarios Edificio $201,201,632 $167,618,637.00 $1,102,403 1415010114 $0 594 LEGALIZACION
6 SER AMBIENTAL 830.131.031-1 Serv Recoleccion Basuras $1,575,000 $1,261,011.00 $245,054 1415010138 $245,054 595
7 TELMEX COLOMBIA SA 830.053.800-4 Servicio Internet $2,800,000 $1,786,362.00 $174,659 1415010138 $174,659 596
8 BARNES COLOMBIA 860.002.455-7 Sum Bomba Eyectora Fuente y Maquinas Piscina $1,650,154 $0.00 $1,650,154 1415010127 $1,650,154 597
9 MARIA HOLANDA FERIAS 51.600.933 Mano de Obra Aseo $29,713,449 $4,649,999.00 $1,840,000 1415010137 $1,656,000 598
10 JC PINTURAS Y ACABADOS 19.158.436-6 Acta No 3 Pintura Interior $74,767,026 $24,353,197.00 $5,972,897 1415010130 $4,788,455 599
11 SEGEP INGENIERIA 900.575.475-7 Acta No 1 Cajas $27,619,796 $0.00 $17,397,096 1415010141 $15,665,821 600
12 ELIZABETH DAVILA CARDONA 860.170.005-1 Anticipo Lavaderos en Fibra $1,235,071 $0.00 $617,499 1415010125 $617,499 601
13 SEGEP INGENIERIA 900.575.475-7 Acta No 3 Sum e Int Acometidas $118,617,584 $114,371,327.00 $17,404,175 1415010112 $13,074,226 602
14 CHALLENGER 860.170.005-1 Sum Aparatos Cocina $91,939,167 $70,206,149.00 $21,733,018 1415010125 $0 603 LEGALIZACION
15 COVAL 830.063.800-7 Sum LAVAPLATOS Y LAVADEROS $4,135,890 $0.00 $4,135,890 1415010125 $4,135,890 604
16 INSUMOS Y SUMINISTROS PARA LA CONSTRUCCION 900.373.129-6 Sum Ferreteria $2,182,222 $0.00 $2,182,222 Varios $2,182,222 605
17 TODACO SAS 830.102.080-9 Anticipo Enchape APTOS Y Piscina $32,806,510 $0.00 $32,806,510 1415010114 $32,806,510 606
18 JOHN FREDY PARDO 900.399.853-3 Anticipo Puertas Seguridad $8,100,000 $0.00 $4,050,000 1415010123 $4,050,000 607
19 ORLANDO CERON 9.524.191 REEMBOLSO CAJA MENOR No 017 $7,490,000 $4,506,749.00 $259,444 1415010133 $259,444 608 REEMBOLSO
20 ORLANDO CERON 9.524.191 7REEMBOLSO CAJA MENOR Tecnica No 027 $17,850,000 $13,977,836.00 $599,964 1415010133 $599,964 609 REEMBOLSO
21 MARMOLES ARTESANIAS Y FIGURAS LTDA 900.071.629-0 Anticipos Mezones en Marmil y Granito $73,423,116 $0.00 $22,026,935 1415010125 $22,026,935 610
22 ALAMBRES Y MALLAS 860.007.668-1 Acero Via $6,565,199 $0.00 $6,565,199 1415010102 $6,565,199 611
23 SOLUCIONES Y FERRETERIA CUELLAR 900.513.594-1 Materiales Ferreteria $613,500 $0.00 $613,500 Varios $613,500 612
24 CERON & CIA S.A.S 830.509.964-2 PAGO NOMINA A 15 DE Julio DE 2017 $288,204,000 $211,405,117.00 $11,632,323 ,1415010138 $11,632,323 613 REEMBOLSO
(REEMBOLSABLES DE PERSONAL EN OBRA)
25 CERON & CIA S.A.S 830.509.964-2 $195,679,168 $0.00 $58,642,971 ,1415010125 $23,504,421 614
Sum e Inst de Cocinas
26 TITO ANGULO QUIÑONES 16.790.628 Mano de Obra Pañetes $82,587,450 $53,864,587.00 $23,366,064 1415010148 $19,995,774 615
27 URBANISMO Y MAQUINARIA SAS 900.943.865-5 Redes Alcantarillado $73,999,478 $43,800,378.00 $30,199,100 1415010141 $26,389,636 616
28 MARLENY SILVA 52.212.687 Acta No 9 Mano de Obra Enchapes $63,383,804 $49,185,284.00 $10,019,639 1415010114 $9,017,675 617
29 LUIS CARLOS OCHOA 93.131.797-1 Sum e Insta Cerramiento $20,490,945 $4,607,079.00 $3,522,878 1415010122 $3,173,527 618
30 LA ROCA 80.061.304-6 Sum Canastilla $4,389,000 $0.00 $4,389,000 1415010124 $4,389,000 619
31 ORLANDO CERON 9.524.191 Suministro Enchape Porteria $5,300,000 $0.00 $5,300,000 1415010141 $5,300,000 620
32 LUIS CARLOS OCHOA 93.131.797-1 Sum e Inst Baranda Punto Fijo $24,831,917 $23,466,723.00 $1,309,000 1415010122 $659,957 621
33 LUIS CARLOS OCHOA 93.131.797-1 Sum e Insta Ducto $4,294,459 $3,611,901.00 $1,009,047 1415010148 $609,047 622
34 LUIS CARLOS OCHOA 93.131.797-1 Sum e Insta Barandas $49,551,449 $29,170,298.00 $3,017,132 1415010122 $1,522,093 623
35 CONSTRUCCIONES JC SAS 900.641.860 Estructura BOX $36,326,311 $23,694,475.00 $12,597,164 1415010148 $11,345,863 624
36 ABASTECEDOR COLOMBIANO 900,189,945 Sum Material Dry Wall $55,452,868 $42,611,803.00 $2,754,424 1415010120 $2,754,424 625
37 CONSTRUCCIONES JC SAS 900.641.860 Jornales $3,000,000 $0.00 $1,962,360 1415010148 $1,767,435 626
38 INGENIERIA Y CONSTRUCCIONES JB SAS 900669948-3 Pavimento Via $45,000,000 $0.00 $8,000,000 $8,000,000 627
TOTALES $ 351,753,847.50
TODACO $ 1,102,404.00
Imperdeco $ 749,028.00
CHALLENGER $ 21,733,018.00
URBIMAQ $ 814,297.00