Está en la página 1de 9

UNIVERSIDAD AUTONOMA DE CHIAPAS FACULTAD DE

INGENIERIA CAMPUS I

MATERIA: HIDROLOGIA

CATEDRATICO: M.I. MUCIÑO PORRAS JUAN JOSE

SEMESTRE: 6

GRUPO: A

TAREA NO. 1

INTEGRANTES DEL EQUIPO:


HERNÁNDEZ AVENDAÑO ERWIN
LÓPEZ MÉNDEZ ELÍAS DE JESÚS
TRUJILLO ALFARO BRANDON ALEXIS

TUXTLA GUTIERREZ, CHIAPAS A 16 DE AGOSTO DEL 2019


UNIVERSIDAD AUTÓNOMA DE CHIAPAS
FACULTAD DE INGENIERÍA
HIDROLOGÍA Grupo 6º “A”
Profesor M. I. Juan José Muciño Porras. Agosto – noviembre 2019

Nombre del equipo: Grupo HTL


Lema: “La imaginación en funcionamiento”
Correo electrónico: grupoHTL1@outlook.com

Tarea No. 1

Entrega: agosto 16

1. Seleccionen un evento hidrológico importante, como una inundación o una sequía a


nivel estatal, nacional o internacional, que haya ocurrido durante el año pasado y
describan sus consecuencias. (Problema 1.5.4, Chow V T, Hidrología Aplicada.
McGraw-Hill, Primera Edición, 1994). En negritas la fuente del problema.

EL CLIMA DE AUSTRALIA 2018: SEQUÍA, CALOR Y FUEGO

El año pasado fue una época de clima excepcional y calor sin precedentes según
la declaración anual del clima de la Oficina de Meteorología.

La Oficina emitió cuatro declaraciones climáticas especiales relacionadas con el


calor "extremo" y "anormal", e informó una serie de registros climáticos rotos.

Una de las historias principales del año fue la sequía en el este de Australia,
centrada en Nueva Gales del Sur, pero que también afectó a Victoria, el este del sur
de Australia y el sur de Queensland.
Cortesía de: http://www.born.gov.au

Con toda NSW declarada en sequía durante la segunda mitad de 2018, esta sequía
se registrará como una de las más significativas en la historia de Australia,
clasificándose junto a las sequías del Milenio, 1960, Segunda Guerra Mundial y
Federación. De esas sequías históricas, solo la Sequía del Milenio vio temperaturas
similares, que acompañaron.(1)

CONSECUENCIAS

El impacto económico más obvio de la sequía está en el volumen de la producción


agrícola, particularmente de los cultivos, que típicamente caen bruscamente durante
una sequía.
El impacto en los productos ganaderos es un poco más complicado. Una vez que las
condiciones de sequía se hayan establecido lo suficiente, los productores de ganado
buscarán reducir sus rebaños o manadas, lo que resulta en un aumento temporal en
el volumen registrado de producción de carne.

Cuando se desata la sequía, la producción de carne registrada generalmente cae a


medida que los ganaderos se centran en la reconstrucción de sus rebaños.

Las sequías también pueden afectar los precios recibidos por productos agrícolas.

1
The conversation. Australia’s 2018 in weather: drought, heat and fire. Fecha de consulta el 11 de agosto del
2019. Disponible en: https://theconversation.com/australias-2018-in-weather-drought-heat-and-fire-109575
Cuando una gran disminución en la producción australiana tiene un impacto
significativo en los suministros, como suele ser el caso del trigo, los precios
generalmente aumentan durante la sequía, lo que puede proporcionar una
compensación parcial para aquellos productores que pueden producir un cultivo. Sin
embargo, el sacrificio de rebaños y rebaños durante una sequía generalmente
resulta en una disminución inicial de los precios del ganado.
2. The firm for which you work obtains a contract for designing a pipe to carry a liquid
hazardous waste between the plant where it is produced as a by-product and a storage
facility where it is held until it can be transported to a disposal site. The two sites are 1.2
miles apart. During the site investigation, you find that the route propose by the client
passes through a very permeable geologic formation. You recognize that a leak or rupture
of the pipe in the area of the permeable formation could cause significant problems with
the quality of the water withdrawn from the aquifer.

You bring the problem to the attention of your supervisor and propose an alternative route
for the pipe. Your proposal would increase both the length of the pipe and the cost of the
project, as well as delay the completion date of the project. Your supervisor tells you that
the project is to be completed as planned and that the potential hazard is not your
concern. What action, if any, should you take? (1.6.1 Case Study 1, McCuen R H,
Hydrologic Analysis and Design, Prentice Hall, Third Edition, 2005).

Building the project strictly in this way entails great risks such as affecting water
quality, since nothing justifies doing a project in which, it seriously affects the water of
an aquifer because water is the most important element for life. It is of vital
importance for the human being, as well as for the rest of animals and living beings
that accompany us on planet Earth. Therefore, drastic measures are required and
unless the route is changed or the project is improved with greater technology, the
integrity of nature should not be jeopardized, so the project would not be carried out
without the change of route and increase being allowed budget.
3. Compren una carta de INEGI de su localidad o interés, y:
Cuenca de San Cristobal de las casas, punto de interés: Terminal OCC.
Coordenadas: 16.729903°,-92.638023°

a) Determinen el área de su micro cuenca de drenaje al seleccionar una corriente


que consideren como principal.

Consideramos como corriente principal a la corriente marcada en rojo por ser la


elevación más alta en el sector y la que más agua transporta hasta el punto de
interés.
El área resulta de: 3.64 km2.
b) Determinen la elevación media de su micro cuenca seleccionada.
La elevación media la definimos conociendo las alturas mínima y máxima y
obteniendo la media entre estas.
Elevación máxima: 2276 m.
Elevación mínima: 2119 m.
Elevación media:
2276 + 2119
𝐸𝑚 = = 2197.5 𝑚𝑠𝑛𝑚
2

c) Determinen el orden de las corrientes de su micro cuenca.


El orden las corrientes de la cuenca en cuestión es de: 2
d) Determinen la longitud del cauce principal.
La longitud del cauce principal la obtuvimos empleando las herramientas provistas
por el software “Google Earth Pro”, teniendo así una longitud de: 1.82 km.

e) Calculen la densidad de corriente de su micro cuenca seleccionada.


La densidad de corriente es:
9 1
𝐷𝑠 = = 2.473
3.64 𝑘𝑚2

f) Calculen la densidad de drenaje de su micro cuenca seleccionada.


0.22 + 0.91 + 0.85 + 0.67 + 0.26 + 1.35 + 0.34 + 1.40 1
𝐷𝑑 = = 1.648
3.64 𝑘𝑚

g) Calculen la pendiente media del cauce principal de su micro cuenca seleccionada.

Sección Longitud del tramo Altura inicial Altura final Pendiente


1 69.9 2248 2219 0.4149
2 80.1 2219 2198 0.2622
3 57 2198 2199 0.0175
4 32 2199 2197 0.0625
5 218 2197 2200 0.0138
6 173 2200 2161 0.2254
7 78 2161 2149 0.1538
8 110 2149 2149 0
9 86 2149 2139 0.1163
10 106 2139 2133 0.0567
11 240 2133 2127 0.0250
12 590 2127 2122 0.0085

𝐿
𝑆=
𝑙1 𝑙 𝑙
+ 2 + ⋯+ 𝑛
[√𝑆1 √𝑆2 √𝑆𝑛 ]
12
𝑙𝑖
∑ = 7481.7637 𝑚
𝑖=1
√𝑆𝑖
2
1840 𝑚
𝑆=[ ] = 0.0605
7481.4764 𝑚
Pendiente media del cauce principal: 𝑆 = 0.0605

También podría gustarte