ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

ANEJO III
ESTUDIO HIDRULICO DE LOS ROS PAS Y PISUEA

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

NDICE
1. INTRODUCCIN Y OBJETIVOS. ...........................................................................1
2. DATOS TOPOGRFICOS.........................................................................................2
3. ESTUDIOS HIDROLGICOS...................................................................................4
3.1. Datos hidrolgicos................................................................................................4
3.2. Puntos de clculo..................................................................................................5
3.3. Caudales de avenida. ............................................................................................6
3.4. Distribucin de los caudales de avenida...............................................................6
4. PARMETROS HIDRULICOS ..............................................................................7
4.1. Seleccin del modelo hidrulico. .........................................................................7
4.2. Parmetros hidrulicos y Caracterizacin hidrulica del cauce. ..........................8
4.2.1. Nmero de Manning o coeficiente de rugosidad...........................................8
4.2.2. Coeficientes de contraccin y expansin ......................................................9
4.2.3. Condicin de contorno. .................................................................................9
4.2.4. Tipo de rgimen...........................................................................................11
4.3. Otros datos..........................................................................................................11
5. RESULTADOS DEL ESTUDIO HIDRULICO ....................................................12
5.1. Presentacin de resultados..................................................................................12
5.2. Diagnstico de inundabilidad .............................................................................13
5.2.1. Ro Pas.........................................................................................................15
5.2.2. Ro Pisuea..................................................................................................17
Apndice 1: Breve descripcin del modelo HEC-RAS
Apndice 2: Estimacin del coeficiente de rugosidad de Manning
Apndice 3: Resultados numricos
Apndice 4: Descripcin de estructuras singulares

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

1. INTRODUCCIN Y OBJETIVOS.
Toda la cuenca del ro Pas, incluyendo el rea de influencia de las mareas, abarca
una superficie de 659,9 km2. En toda esta superficie se estima que viven cerca de
94000 habitantes, en su mayora en zonas llanas, riberas de inundacin y
cercanas de ros o arroyos donde la tierra es ms frtil, factor de vital
importancia para una comarca de marcado carcter agrcola y ganadero.
Los ros de la cuenca, el ro Pas y el Pisuea, con sus arroyos afluentes, poseen
en su parte alta cauces muy delimitados por paredes rocosas y perfiles de gran
pendiente, por lo que no causan grandes inundaciones, mantenindose el agua en
los cauces principales en tiempo de grandes avenidas.
En las zonas media y baja o en el estuario y en las zonas de afluencia, los cauces
poseen llanuras muy amplias y de escasa pendiente que en los periodos de lluvia
intensa, se inundan y estancan posteriormente, dejando reas anegadas que
pueden distar hasta 500 metros del centro de los ros. Un ejemplo de este ltimo
caso es la confluencia de los ros Pas y Pisuea entre Puente Viesgo y Quijano,
as como la gran vega de inundacin del ro Pas en el Valle de Toranzo y las
llanuras del ro Pisuea en los valles de Castaeda y Cayn.
Por tanto, la determinacin de la lnea de inundacin, que delimita el alcance de
las aguas del ro en una avenida en un periodo de retorno, es de extrema
importancia en estas reas para el planeamiento urbanstico, socioeconmico y
ambiental.

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

2. DATOS TOPOGRFICOS.
Dada la importancia de la representacin topogrfica para que el modelo de
simulacin se ajuste fielmente la realidad y se pronostique un suceso futuro, se
ha realizado un levantamiento topogrfico del terreno.
ste consta de 234 perfiles transversales del cauce y las riberas de inundacin, a
los que hay que aadir las secciones detalladas de las estructuras singulares que
existen en los cauces. Del total de perfiles medidos 98 pertenecen al ro Pas, con
una longitud media de perfil de 318.5 m, y 119 perfiles al ro Pisuea, con una
seccin media de 250 m. El resto de perfiles se repartieron entre los arroyos
Carrimont y el Magdalena.
La topografa tomada como base para la zona objeto de estudio es la
correspondiente al Gobierno de Cantabria a escala 1:5000. As mismo se dispone
del Modelo Digital del Terreno (M.D.T) con la misma resolucin y un mallado
de 10x10 m. Adems de la cartografa mencionada se ha utilizado la del I.G.N a
escala 1:25000.
El levantamiento topogrfico realizado se encuentra recogido en el Anejo
Topogrfico y en el Documento de Planos, donde se presentan los perfiles
transversales del cauce y su situacin en planta. En dicho anejo tambin se
exponen las secciones obtenidas en campo de las estructuras singulares de los
cauces, cuyas fichas descriptivas se presentan en el Apndice 4.
En la figura 1 se muestra la cuenca fluvial, hasta el lmite de influencia mareal,
objeto de estudio.

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Figura 1 Cuenca fluvial

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

3. ESTUDIOS HIDROLGICOS.
El clculo de los caudales de una determinada avenida, dato principal para el
posterior clculo hidrulico, se aborda mediante la realizacin de un modelo
hidrolgico, que trasforma precipitacin en escorrenta. Para ello se emplea el
modelo HEC-HMS del USACE, Cuerpo de ingenieros de la armada de los
Estados Unidos, versin 2.2.2, modelo gratuito mundialmente conocido y
contrastado para este tipo de clculos. Adems se cuenta con la ayuda de la
extensin GeoHms (USACE) para Arcview con la que se han calculado
numerosos parmetros de las subcuencas y tramos de ro, adems del esquema de
clculo de subcuencas (ver Anejo Hidrolgico).
3.1. Datos hidrolgicos.
Para este estudio es necesario el clculo de ciertos valores como son la superficie
de cuenca vertiente, serie histrica de lluvias, el tipo de suelo para el clculo del
coeficiente de escorrenta.
La caracterizacin de cuenca vertiente del sistema ro Pas-Pisuea se ha
determinado a partir de la cartografa mencionada anteriormente.
La superficie de la cuenca meramente fluvial, excluyendo el estuario, para el ro
Pas es de 649 km2. El mayor afluente, ro Pisuea, con 35 Km. de longitud tiene
una cuenca de 201,00 km2. Los siguientes afluentes de menor importancia pero
tambin contemplados son los arroyos Magdalena y Carrimont con cuencas de
7.09 km2 y 17.51 km2 respectivamente.
En cuanto a la pluviometra, se han seleccionado siete estaciones pluviomtricas,
entre las 24 existentes en la cuenca del ro Pas, que se consideran representativas
de las diferentes zonas de la cuenca (alta, media y baja). Dicha seleccin se ha
basado tambin en otros criterios, que han sido la extensin de las series de datos
disponibles y el estado de funcionamiento actual de las estaciones.
El tipo de suelo se obtiene del estudio, geolgico, edafolgico y litolgico de la
cuenca.

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

3.2. Puntos de clculo.


Se han seleccionado 14 puntos donde se han obtenido los caudales de avenida en
la red fluvial de los ros Pas-Pisuea para diferentes periodos de retorno. Cabe
sealar que en cada punto calculado se contempla todo el rea de la cuenca aguas
arriba del mismo en el ro principal, Pas o Pisuea.
En la Figura 2 se muestra la ubicacin de los mismos. Nueve de estos puntos, del
I1 al I9, se sitan en el ri Pas y cinco, del M1 al M5, en el ri Pisuea.
Como puntos de unin significativos cabe destacar:
I3: Incorporacin del ro Magdalena al Pas
I6: Incorporacin del Pisuea al Pas.
I9: situado aproximadamente en la localidad de Puente Arce, lmite de
influencia mareal.

Figura 2. Puntos de clculo

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

3.3. Caudales de avenida.


Los caudales de avenida estimados en los puntos mencionados para diferentes
periodos de retorno son los que se indican en la tabla 1.
PUNTOS
I1
I2
I3
I4
I5
I6
I7
I8
I9
M1
M2
M3
M4
M5

AREA (Km )
54.64
98.8
239.3
294.04
338.75
567.4
582.2
609.2
627.58
40.89
79.6
127.6
166.01
183.38

T=10 aos
59
98
176
236
267
520
538
541
555
42
84
131
169
195

T=50 aos
87
138
245
327
366
703
727
731
752
56
113
173
224
263

T=100 aos
100
158
275
369
411
783
758
785
809
61
124
189
245
291

T=500 aos
138
203
350
471
521
975
1007
1014
1049
75
150
226
294
355

Tabla 1. Caudales de avenidas en los distintos tramos.

3.4. Distribucin de los caudales de avenida


La reduccin del tamao de una cuenca segn se avanza hacia aguas arriba,
origina la progresiva disminucin del caudal circulante por el cauce.
Si el tramo es suficientemente largo, como ocurre en este estudio, las diferencias
de caudal entre las secciones final (aguas abajo) e inicial (aguas arriba del
mismo), pueden ser importantes.
Por ello, se ha procedido a la estimacin de dicha variacin a lo largo del tramo
objeto de estudio. En la tabla 2 se recogen los tramos a los que se asigna los
caudales de avenida calculados en los puntos correspondientes. Se ha asignado a
cada tramo el caudal calculado en el punto de clculo inmediatamente inferior
ms cercano al mismo, quedando en el lado de la seguridad, ya que en cada punto
se contempla ms rea de la que le corresponde.

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

P u n to d e
c lc u lo d e c a u d a l
I9
I8
I7
I6
I5
I4
I3
I2
I1
M5
M4
M3
M2
M1

TRAM
DESDE
R S 0 /P A 1 0 1
R S 1 9 /P A 8 2
R S 3 2 /P A 6 9
R S 2 8 1 /P I1 2 1
R S 7 1 /P A 3 0
R S 7 7 /P A 2 4
R S 9 4 /P A 0 7
R S 9 9 /P A 0 2
R S 2 8 1 /P I1 2 1
R S 3 0 1 /P I1 0 0
R S 3 1 5 /P I8 6
R S 3 3 1 /P I7 0
R S 3 5 2 /P I4 9

O
HASTA
R S 1 9 /P A 8 2
R S 3 2 /P A 6 9
R S 2 8 1 /P I1 2 1
R S 7 1 /P A 3 0
R S 7 7 /P A 2 4
R S 9 4 /P A 0 7
R S 9 9 /P A 0 2
R S 1 0 0 /P A 0 1
R S 3 0 1 /P I1 0 0
R S 3 1 5 /P I8 6
R S 3 3 1 /P I7 0
R S 3 5 2 /P I4 9
R S 4 0 0 /P I0 1

Tabla 2. Distribucin de los caudales

4. PARMETROS HIDRULICOS
4.1. Seleccin del modelo hidrulico.
El clculo de los niveles de avenida en un cauce real de geometra compleja,
obliga a la utilizacin de modelos matemticos capaces de representar
adecuadamente la hidrulica fluvial.
Entre las herramientas disponibles actualmente en el mercado, el modelo HECRAS (Hydrologic Engineering Center-River Analysis System), tambien del
USACE y descrito en el apndice I, es uno de los ms habitualmente utilizados
por organismos y empresas encargadas de la gestin de los ros, por lo que sus
resultados han sido ampliamente contrastados y adems es de gratuita
distribucin y uso. Actualmente se trabaja con la versin 3.12 de 2004.

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

4.2.

Parmetros

hidrulicos

Caracterizacin

hidrulica

del

cauce.
Para la aplicacin del modelo descrito es necesario establecer en primer lugar las
caractersticas geomtricas del cauce, definidas con los perfiles transversales y
estructuras singulares obtenidos del levantamiento topogrfico.
A continuacin se establecen los parmetros hidrulicos del mismo que influyen
directamente en el comportamiento del flujo (nmero de Manning, coeficientes
de contraccin y expansin y condicin de contorno), tal y como se indica a
continuacin:
4.2.1. Nmero de Manning o coeficiente de rugosidad.
El concepto de rugosidad equivalente de Nikuradse permite simular la aspereza o
falta de uniformidad de los contornos de un canal. En el caso de un ro de lecho
mvil, la resistencia al flujo se puede explicar con base en la caracterizacin de la
rugosidad del sedimento que forma el cauce y en la formas del lecho.
Diversos autores han propuestos expresiones que permiten relacionar los
parmetros hidrulicos de rugosidad (por ejemplo el nmero de Manning) con el
tamao de los sedimentos y con las dimensiones de las formas del lecho
mencionados anteriormente (Van Rijn, 1989).
Asimismo, existen relaciones entre las caractersticas de los suelos
potencialmente inundables por la crecida de un ro con dichos parmetros
hidrulicos (Ven Te Chow; Hidrulica de los Canales Abiertos; 1994). Esto
permite estimar unos coeficientes de rugosidad en las riberas de inundacin que,
como es bien sabido, suelen diferir de los correspondientes al cauce de aguas
bajas.
En la cuenca del ro Pas se cuenta con informacin sobre la granulometra del
cauce en diversos puntos y con datos sobre los usos del suelo en la zona
adyacente al mismo. Por ello, se ha considerado oportuno proceder al clculo de
los coeficientes de rugosidad correspondientes utilizando dicha informacin.

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Para el clculo hidrulico se ha utilizado un coeficiente de rugosidad de Manning


en el cauce que vara desde 0.028 a 0.031 segn el perfil estudiado. Para las
riberas de inundacin vara desde 0.035 hasta 0.080 segn el tipo de suelo en el
tramo. Estos datos se detallan en el Apndice II de este Anejo.
4.2.2. Coeficientes de contraccin y expansin
Son los coeficientes que definen la brusquedad en la transicin entre dos perfiles
consecutivos segn su morfologa. As, por ejemplo, los valores por defecto del
modelo HEC-RAS son: cero para una seccin de canal piramidal, tanto para el
coeficiente de expansin como para el de contraccin, pasando a ser 0.5 para el
primero y 0.3 para el segundo al pasar por un puente y de 0.3 y 0.1
respectivamente en el caso de una transicin gradual.
4.2.3. Condicin de contorno.
Establece el valor de los parmetros que definen el comienzo y final de la
ejecucin del modelo hidrulico, para ello hay que conocer, en algn punto del
cauce, la relacin entre los caudales circulantes y los niveles de la lmina de agua
o, si no se contase con dicha informacin, situar el perfil lo suficientemente
alejado como para asegurar que posibles errores en el establecimiento de la
condicin de borde (dentro, lgicamente, de un rango razonable) no afecten a los
niveles de avenida en esa zona. Este perfil deber estar aguas arriba en el caso de
rgimen supercrtico, aguas abajo en rgimen subcrtico y en ambos para el
mixto.
Se ha adoptado la condicin de contorno de caudal en el extremo ms aguas
arriba segn el caudal de avenida calculado para cada punto en el estudio
hidrolgico, siguiendo la distribucin de caudales explicada anteriormente.
Mientras que aguas abajo la condicin de desage viene impuesta por el nivel de
la marea en el estuario.
La condicin de contorno aguas abajo hace necesario decidir qu nivel de marea
es el que hay que igualar a la misma.

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

El clculo se ha efectuado con dos condiciones de contorno para el desage


diferentes, la primera de ellas suponiendo el nivel medio del mar y la segunda
coincidiendo con la marea viva equinoccial resultado del estudio de
inundabilidad en el estuario, haciendo coincidir ambas con la avenida de T=500
del ro.
El resultado indica que la diferencia de nivel slo afecta en los primeros tres
perfiles hidrulicos para cualquier avenida, los primeros 1260 metros del tramo
fluvial, coincidiendo a partir de este. En el peor de los casos la diferencia supone
una variacin de tres metros en el nivel de agua mximo alcanzado, y no implica
mayores incidencias ya que no se rebasa la cota de ribera. En las figuras 2 y 3 se
muestra tal diferencia.

Figura 2. Influencia de la marea media y equinoccial en la condicin de contorno

Figura 3. Influencia de la marea media y equinoccial en la condicin de contorno (Ampliada)

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

10

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Adems, se ha comprobado que en el caso de que coincida la mxima marea con


la avenida de 500 aos del ro, la diferencia entre la avenida de 10 aos y la de
500 aos de periodo de retorno tan solo supone una sobre elevacin de poco mas
de medio metro, de 7.35 a 8.00 m de cota inundable respectivamente, como se
muestra en la figura 4.

Figura 4. Diferencia entre la avenida de T =1 0 y T = 500 aos

La combinacin de ambas condiciones de contorno permite considerar la


situacin ms desfavorable, en lo que a niveles de avenida se refiere, dado que se
hacen coincidir los mximos caudales en el ro con la marea mxima viva
equinoccial mxima, ambos en condiciones de permanencia en el tiempo.
4.2.4. Tipo de rgimen.
Sealar, por ltimo, que el calculo se ha realizado suponiendo rgimen subcrtico, de
forma que los niveles obtenidos en dicha zona se encuentran del lado de la seguridad.

4.3. Otros datos.


Otros estudios realizados y tenidos en cuenta para la realizacin de este estudio
son el Anejo socioeconmico y el Estudio de los recursos hdricos de los ros de
la vertiente norte de Cantabria- cuenca del ro Pas realizado para el Gobierno de
Cantabria, para la obtencin de datos de planeamiento urbanstico, de usos del
suelo, de tipos de vegetacin y de cultivos.

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

11

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

5. RESULTADOS DEL ESTUDIO HIDRULICO


5.1. Presentacin de resultados
En el Apndice 3 se recogen los resultados del clculo hidrulico en situacin
actual, realizado con los caudales correspondientes a periodos de retorno de T =
10, 100 y 500 aos. En dicho apndice la informacin se presenta de la siguiente
manera:
Una tabla donde se recogen, para cada uno de los perfiles del clculo
hidrulico, el caudal circulante (Q Total), la cota mnima topogrfica del
fondo del cauce (Min Ch El); la cota de lamina de agua (W.S. Elev); el
calado en la seccin (Max Chl Dpth); la cota de la lnea de energa (E.G.
Elev); la pendiente de la lnea de energa (E.G.Slope); la velocidad en el
cauce central en la seccin (Vel Chnl); la velocidad en las mrgenes
izquierda (Vel Left) y derecha (Vel Right); el rea mojada (Flow Area) y el
nmero de Froude de la seccin (Froude#XS).
Los perfiles transversales obtenidos directamente del modelo con la
representacin de la avenida de 500 aos de periodo de retorno.
En el Apndice 4 se presentan las fichas descriptivas correspondientes a las
diferentes estructuras singulares de los cauces, con un primer diagnstico del
comportamiento hidrulico de las mismas.
Estos resultados se recogen en forma grfica en el Documento de Planos. De esta
forma, en el Plano de manchas de inundacin se presentan las zonas inundables
para la avenidas de T=10, 100 y 500 aos, en el Plano 20 se indican los calados
correspondientes a la avenida de T=500 aos.
Hay que sealar que dicho plano aparecen indicadas zonas potencialmente
inundables. Estas zonas son aquellas que se encuentran situadas por debajo de la
cota de una avenida de periodo de retorno determinado, pero no son alcanzadas
por el agua ya que los ros discurren encauzados en esos tramos. No obstante,
cualquier incidencia en el funcionamiento hidrulico de los encauzamientos
originara la inundacin de esas reas para la avenida correspondiente.

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

12

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

5.2. Diagnstico de inundabilidad


Como punto final del presente estudio hidrulico, en este apartado se exponen los
problemas de inundabilidad que aparecen en distintos tramos del Pas y el Pisuea
para la avenida de 500 aos de periodo de retorno.
La inundabilidad de estas zonas se representa grficamente en el plano de
manchas de inundacin (Documento de Planos), como en el ejemplo de la
siguiente figura.

Figura 5. Detalle de zona inundable en Vioo (Plano 19)

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

13

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

La localizacin de los perfiles del clculo hidrulico, empleados como referencia


en los apartados siguientes, se presenta en el siguiente esquema.

RS 0 ARCE
RS 11

RS 3

RS 17
RS 23

RS 29

RS 315

RS 281

RS 41

RS 319

RS 55

RS 294

RS 301
RS 331

RS 72
RS 343
RS 351
RS 77
RS 362

RS 372
RS 389

RS 81

RS 400
RS 94

RS 100

Figura 6.Esquema de situacin de perfiles

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

14

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

5.2.1. Ro Pas
Desde el comienzo del tramo de estudio, en Bustantiga, hasta la confluencia con
el arroyo Magdalena en Entrambasmestas, se producen incidencias tanto en la
margen derecha, a la altura del Puente colgante de Ocejo, como en la izquierda,
que inunda el barrio de la Aguilera (Perfiles RS99-RS94)
Entre la confluencia del Magdalena y el Puente de Vejors, la avenida discurre
mayoritariamente por el cauce principal, producindose desbordamientos
puntuales que afectan a praderas en ambas mrgenes (RS94-RS83). Tan solo en
el barrio San Lorenzo, la lnea de inundacin afecta al parque Aniceto Pelln,
acercndose a la zona urbana (RS88-86)
Inmediatamente aguas abajo del Puente Vejors, en el parque de la Alceda de
Ontaneda, se produce la inundacin parcial de la margen izquierda en un tramo
de unos 300m (RS83-82)
El encauzamiento del Pas entre Ontaneda y el Puente de San Vicente de Toranzo
(RS82 a RS79), permite que la avenida discurra por el cauce principal.
Aguas abajo del Puente anteriormente citado, hasta Villegas, el ro se desborda
por ambas mrgenes, afectando a praderas y al punto limpio de San Vicente de
Toranzo.
En Santiurde de Toranzo se produce el desbordamiento en la margen derecha,
afectando un rea reducida. En esta misma zona, inmediatamente aguas arriba del
Puente de la Unin Deseada, la inundacin de la margen derecha alcanza la
carretera local (RS78)
En el tramo encauzado entre el mencionado Puente y la confluencia con el arroyo
Iruz, en El Soto, no se produce desbordamiento (RS78-73).
Aguas abajo de este punto (RS72), los desbordamientos se producen afectando a
ambas mrgenes.

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

15

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Especial relevancia tiene la inundacin en las localidades de Aes, por la


izquierda, y La Penilla de Toranzo, por la derecha, donde alcanza ncleos
urbanos (RS71 a RS64).
En Corrobrceno, la inundacin de la margen derecha afecta al camino peatonal
situado en la antigua plataforma del ferrocarril Santander Mediterrneo.
En Puente Viesgo, el cauce esta suficientemente encajado para evitar
desbordamientos de importancia (RS52-58)
El Puente del Balneario (RS54), tiene suficiente capacidad para trasegar la
avenida de 500 aos.
El ro vuelve a desbordarse, por ambas mrgenes, en el meandro de Villabez
(RS46 a RS49). Entre este ltimo punto hasta la confluencia con el ro Pisuea se
producen inundaciones puntuales aguas arriba de la poblacin de Vargas.
En Vargas, los Puentes de la carretera nacional 634 en su tramo antiguo y en el
nuevo trazado, no inciden en la capacidad de desage del cauce.
Aguas abajo de la confluencia citada, hasta los Puentes nuevo y antiguo de
Caranda (RS34 y RS36), el ro discurre encajado entre la ladera de Pea Tarugo
y la N-634 mencionada. Dichos puentes no originan sobre-elevaciones
apreciables.
Aguas abajo del Puente de la N-623, en Caranda, el cauce se desborda en ambas
mrgenes. En la margen izquierda, la inundacin alcanza el pi del talud de
carretera nacional direccin a Torrelavega (RS33). En su margen derecha, la
lnea de avenida alcanza a varias viviendas de Caranda (RS30-RS28).
Entre Caranda y Renedo de Pilagos se ve afectada la llanura de inundacin
entre ambas mrgenes (RS26-RS23), alcanzando prcticamente la totalidad del
ncleo urbano de Vioo a la izquierda del ro y varias naves en Renedo a la
derecha.
Pasados, sin problemas, los puentes de la carretera comarcal CA-234 que une
Renedo con Zurita y el del F.F.C.C. a Madrid, en la margen derecha, aguas abajo
ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

16

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

del Carrimont, se ve afectado un polgono industrial y un poco mas aguas abajo


afecta a la carretera CA-233 en Quijano por (RS19-14).
A la izquierda, el agua alcanza la carretera CA-231 que une Vioo con Orua,
afectando a alguna edificacin del barrio Salceda. (RS19-RS18).
Continuando por la misma margen, la lnea de inundacin se acerca a la carretera
en varios puntos, y pasado el azud llega a adentrarse bajo un antiguo molino, hoy
da restaurado como restaurante (RS18 a RS09). Por la margen opuesta, la
inundacin anega los invernaderos del barrio Borrablo de Barcenilla, as como
parte de las praderas e islas dentro del cauce entre ambas mrgenes, hasta el
Barrio Posadoiros (RS3).
A partir de dicho barrio hasta Puente Arce el ro se mantiene en el cauce hasta
pasados los Puentes romnico de Orua y carretera comarcal direccin a
Torrelavega.(RS3 a RS0).

5.2.2. Ro Pisuea
Desde el comienzo del estudio en el Pisuea, a 1500m aguas arriba del barrio San
Esteban de Selaya, hasta el Puente sito en dicho barrio (RS400 a RS382), la
avenida transcurre sin obstculos por las inmediaciones del cauce.
Pasado el Puente anterior hasta la incorporacin, por la izquierda del arroyo
Bordaln, la avenida invade los terrenos de la margen derecha, anegando una
edificacin cercana al cauce frente a la primera traviesa (RS381 a RS379).
A la altura del barrio Pesquero el agua ocupa las praderas de la margen izquierda
hasta un poco antes de llegar al Puente de la carretera vecinal Tezanos-Selaya
(RS376 a RS375).
En dicho Puente el ro se encaja fluyendo sin problemas, pero una vez rebasado
este, el agua inunda el Barrio Castaar de Selaya en la margen derecha un poco
antes de la incorporacin del arroyo Valvanuz, y la inundacin va cambiando de
una margen a otra hasta el final de este tramo en el Puente de Villacarriedo
(RS375 a RS367).
ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

17

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Aguas arriba del Puente de Villacarriedo, se forma una balsa al abrirse el cauce y
el agua aunque circula bien por los tres vanos del Puente, intenta evadirse por la
derecha del mismo. Aguas abajo del Puente, el ro anega las casas de la margen
derecha (RS367 a RS366).
A continuacin, el agua discurre, casi en su totalidad, por praderas de ambas
mrgenes y posteriormente alterna mrgenes en zig-zag hasta el Puente de
Brcena de Carriedo (RS366 hasta RS364).
Pasado dicho Puente el ro se encauza y tiende a un transcurrir rectilneo por los
meandros mas cortos, y forma eses a medida que estos son mas grandes hasta
llegar al Puente de la carretera que une los ncleos de Vega y Saro, mrgenes
izquierda y derecha respectivamente. Aguas arriba del puente, en Vega, inunda el
camino vecinal y las casas cercanas. Aguas abajo del mismo, sin haber
rebosamiento, pasa a anegar en Saro, hasta la confluencia con el arroyo Saro, las
casas cercanas al cauce (RS364 al RS344).
La avenida discurre por praderas de la llanura de inundacin siguiendo la
carretera CA-143 hasta salir del ncleo urbano de Vega. El puente en este punto
transcurre sin problemas la avenida estudiada (RS344 a RS340).
El ro se encaja en el valle escoltado por el bosque hasta el azud de un antiguo
molino, ahora reformado como restaurante. El cauce se abre y el agua discurre
bajo el edificio a travs de un canal y alcanzando el borde de dicha carretera
comarcal (RS340 a RS336).
Desde el azud hasta pasados los puentes del antiguo y nuevo trazado de la
carretera hacia Santa Mara de Cayn, el ro discurre encajado y sin problemas
entre los mrgenes de bosque (RS336-330).
Aguas arriba del puente peatonal, perfil RS329, el cauce se ensancha por la
derecha de la boca del puente, provocando que la zona se inunde, no llegando a
pasar por encima del camino del puente de esta margen pero s lo hace por la
margen derecha, sin mayores consecuencias.

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

18

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

El ro sigue la carretera entre los perfiles RS329 al RS328. En este ltimo punto
el cauce se vuelve a ensanchar, inundando un restaurante sito entre el ro y la
misma carretera CA-142, a 1200 m de Santa Mara de Cayn.
El ro sigue su curso por debajo del puente, encajndose en el cauce entre el
monte de Totero y la Cerrada de Fuentespila, y bordeando el primero de ellos
para entrar en el valle de Santa Mara de Cayn. En su entrada se expande
ocupando parte del valle afectando a varias viviendas de izquierda del ro
(RS327-RS324).
Desde este pueblo hasta La penilla de Cayn va siguiendo una trayectoria, ms o
menos rectilnea, y pasa por el puente de Santa Mara de Cayn abarcando toda
la vega de inundacin con algn problema puntual aguas abajo del mismo
(RS322 a RS312).
En la margen derecha, en el puente seguido del azud aguas arriba de la fbrica de
la Nestl en La Penilla de Cayn, se produce una retencin del agua con ligera
inundacin de la margen izquierda, permaneciendo encauzado hasta la salida de
la central (RS312 a RS307).
Desde la factora hasta llegar a Pomaluengo, pasando a la altura del ncleo
urbano de La Cueva, el ro inunda las praderas de la parte exterior de los
meandros ms pequeos y lo hace en ambas mrgenes a la vez cuando estos se
hacen ms frecuentes (RS307- RS298).
En Pomaluengo el agua alcanza las primeras viviendas cercanas al cauce y
posteriormente divide por el centro el barrio de La Muela, habiendo pasado por
el tapn formado por el puente de la carretera CA-610 direccin Colsa - San
Romn (RS297-296).
Hasta la salida de la mencionada localidad el ro inunda una extensa superficie de
pradera hasta un poco antes del puente de la carretera que lleva a Puente Viesgo,
donde se vuelve a adentrar en el cauce (RS296-291).
A partir de aqu y hasta el encuentro del Pisuea con el Pas, las aguas circulan
encajonadas entre el monte y la carretera nacional N-634 llegando a acercarse a
sta en el perfil RS282.

ANEJO: Estudio Hidrulico de los ros Pas y Pisuea

19

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

APNDICE 1:
BREVE DESCRIPCIN DEL MODELO HEC-RAS

Estudio Hidrulico de los ros Pas y Pisuea. Apndice 1

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

1. BREVE DESCRIPCIN DEL MODELO HEC-RAS.


El modelo HEC-2 fue desarrollado en la dcada de los 60 por el
Hydrologic Engineering Center, organismo dependiente del U.S. Army Corps of
Engineers. Desde su primera versin en 1964 ha sido mejorado sucesivamente
hasta la versin de 2004 que se denomina HEC-RAS 3.1.2 en la cual se ha
basado el clculo hidrulico desarrollado en este documento. Este modelo ha sido
utilizado con xito en estudios similares para la determinacin de los perfiles de
la lmina de agua en cauces. El modelo simula las condiciones de una corriente
en lmina libre determinada, ros o canales, calculando las variables
caractersticas del flujo en rgimen permanente. Es de dominio pblico, siendo
las principales caractersticas que lo diferencian del modelo HEC-2, ampliamente
utilizado desde hace varios aos y en el que se basan sus principales capacidades:
HEC-RAS asume los mismos supuestos tericos, y por lo tanto las mismas
limitaciones que stos conllevan. Incorpora todas las funciones que HEC-2
contiene, pero las rutinas de clculo son nuevas, mejorando las capacidades de
computacin. Trabaja bajo entorno Windows y posee una interfaz grfica,
constituyendo cada tipo de datos un archivo independiente e intercambiable, lo
que facilita enormemente la introduccin y revisin de datos y permite
capacidades grficas carentes en otros modelos. Incorpora un archivo de ayuda
suficientemente completo para el correcto manejo del programa, siempre que se
posea un buen conocimiento previo del modelo HEC-2. Este modelo es una
aplicacin de reciente creacin, en proceso de mejora; prximamente se aadirn
nuevas capacidades, como la modelizacin del transporte de sedimentos y la
opcin de realizar simulaciones bajo condiciones de flujo no permanente
(Presente en su ltima versin HEC-RAS 3.1.2).
Por ltimo, permite la importacin de archivos de entrada con formato de
HEC-2, as como el intercambio de informacin (tanto importacin como
exportacin) con sistemas SIG y CAD mediante formato ASCII.
El procedimiento de clculo se basa en la resolucin iterativa de la
ecuacin unidimensional de la energa mediante el mtodo del paso estndar
(Chaudry, 1993). Las principales hiptesis asumidas por el modelo son:
Flujo permanente: no hay variacin del calado ni de la velocidad con el
tiempo.

Estudio Hidrulico de los ros Pas y Pisuea. Apndice 1

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Flujo gradualmente variado: se asume una distribucin hidrosttica de


presiones.
Flujo unidimensional: la nica componente de la velocidad es la direccin
del flujo.
Las pendientes son pequeas, menores del 10%, por lo que el calado es
representativo de la altura de presin.
Los contornos son rgidos, no admitindose erosin o sedimentacin en el
cauce.
Con estas hiptesis, la ecuacin de energa entre dos secciones, S1 y S2 de
un flujo unidimensional, es:
(1)
siendo para la seccin transversal 1 2:
z: elevacin del fondo de la seccin transversal respecto a un nivel de
referencia.
y: calado del agua en la seccin transversal.
: coeficiente de energa, que tiene en cuenta la distribucin no uniforme
de velocidades en esa seccin.
V: velocidad media del flujo en la seccin.
g: aceleracin de la gravedad.
he: prdida de energa entre las secciones 1 y 2.
Esta prdida de energa, he, viene determinada por la expresin:

(2)
siendo:

L: longitud del tramo.


: pendiente de friccin del tramo.
C: coeficiente de prdidas por expansin o contraccin.
La hiptesis fundamental realizada por el HEC-2 es que la prdida de
altura por friccin en una seccin es la misma que tendra un flujo uniforme que
tuviese la velocidad y radio hidrulico correspondiente a esa seccin. Esta
Estudio Hidrulico de los ros Pas y Pisuea. Apndice 1

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

consideracin permite aplicar la ecuacin de Manning de flujo uniforme para


evaluar la pendiente de friccin en una seccin transversal del cauce, con lo que
resulta:
(3)
donde:

Q: caudal.
K: capacidad de transporte que responde a la expresin:

(4)
siendo:
n: coeficiente de rugosidad de Manning.
A: rea de la seccin transversal.
Rh: radio hidrulico.
Los resultados del modelo obtenidos durante el proceso de clculo son el
calado, la anchura de la lmina de agua, la elevacin de la lnea de energa total,
la pendiente de friccin, la velocidad de la corriente, el calado crtico, el volumen
de agua por debajo del perfil calculado y el rgimen hidrulico en el que circula
el agua en cada situacin analizada.

Los resultados del clculo hidrulico dependen, entre otras cosas, de la


condicin de contorno que se adopte, del tipo de rgimen que se produzca en el
tramo, de la forma de desage de las estructuras (puentes, azudes,
traviesas,etc...), aspectos cuya definicin est sujeta a unas ciertas
incertidumbres.
Por ello, se han llevado a cabo una serie de estudios previos que tratan de
determinar la influencia de estas variables en los resultados del clculo y
establecer la forma ms adecuada para abordar el mismo.

Estudio Hidrulico de los ros Pas y Pisuea. Apndice 1

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

APNDICE 2:
ESTIMACIN DEL COEFICIENTE DE RUGOSIDAD DE
MANNING

Estudio Hidrulico de los ros Pas y Pisuea. Apndice 2

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

INTRODUCCIN

El concepto de rugosidad equivalente de Nikuradse permite simular la aspereza o


falta de uniformidad de los contornos de un canal. En el caso de un ro de lecho
mvil, la resistencia al flujo se puede explicar con base en la caracterizacin de la
rugosidad del sedimento que forma el cauce y en la formas del lecho.
Diversos autores han propuestos expresiones que permiten relacionar los
parmetros hidrulicos de rugosidad (por ejemplo el nmero de Manning) con el
tamao de los sedimentos y con las dimensiones de las formas del lecho,
mencionados anteriormente (Van Rijn, 1989).
Asimismo, existen relaciones entre las caractersticas de los suelos
potencialmente inundables por la crecida de un ro con dichos parmetros
hidrulicos (Ven Te Chow; Hidrulica de los Canales Abiertos; 1994). Esto
permite estimar unos coeficientes de rugosidad en las riberas de inundacin que,
como es bien sabido, suelen diferir de los correspondientes al cauce de aguas
bajas.
En la cuenca del ro Pas se cuenta con informacin sobre la granulometra del
cauce en diversos puntos y con datos sobre los usos del suelo en la zona
adyacente al mismo. Por ello, se ha considerado oportuno proceder al clculo de
los coeficientes de rugosidad correspondientes utilizando dicha informacin.
La falta de datos sobre formas del lecho no ha permitido el anlisis de la
influencia de este parmetro sobre la rugosidad. Cabe sealar, no obstante, que
dadas las caractersticas de los sedimentos del cauce, es de esperar que sea su
granulometra el factor preponderante en la rugosidad.
En este sentido, buena parte de los ros Pas y Pisuea cuentan con una
granulometra compuesta en general por granos grandes, pudiendo calificarse
como ros de gravas, donde la afirmacin anterior suele ser cierta.

Estudio Hidrulico de los ros Pas y Pisuea. Apndice 2

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

DATOS DE PARTIDA

2.1 Granulometra
En la tabla 1 y en la figura 1 se recogen las caractersticas y ubicacin de las
estaciones de muestreo de granulometra del cauce de los ros Pas y Pisuea.
ESTACIN COORDENADAS
ALTITUD LOCALIZACIN
X: 438307 Y: 4779433
391 m.
La Vega de Pas
PA01
X: 438404 Y: 4779463
X: 431753 Y: 4780101
279 m.
La Gurueba
PA02
X: 431831 Y: 4780069
X: 426070 Y: 4783054
175 m.
Alceda
PA03
X: 425981 Y: 4783113
X: 422270 Y: 4795492
52 m.
Puente Viesgo
PA04
X: 422359 Y: 4795535
X: 422046 Y: 4802249
17 m.
Renedo (Quijano)
PA05
X: 422013 Y: 4802316
X: 434847 Y: 4783747
254 m.
Selaya
PI01
X: 434842 Y: 4783345
X: 431320 Y: 4794366
103 m.
Sta. Mara de Cayn
PI02
X: 431342 Y: 4794275
X: 422912 Y: 4797139
45 m.
Vargas (Castaeda)
PI03
X: 423001 Y: 4797090
X: 427392 Y: 4780011
209 m.
Entrambasmestas
MA01
X: 427369 Y: 4779912
Tabla 1.

Coordenadas de las estaciones de muestreo.

Dichas granulometras se estimaron visualmente segn la clasificacin


Wentworth, descrita en la tabla 2.
TIPO DE SUSTRATO

WENTWORTH(mm)

VALOR MEDIO

ARENAS-LIMOS
GRAVA
PIEDRA
CANTOS
BLOQUES
LOSA

<2
entre 2 y 16
entre 16 y 64
entre 64 y 256
>256
400

1
9
40
160
300
400

Tabla 2.

.Clasificacin del tamao de las partculas del fondo segn Wentworth, 1992.

Estudio Hidrulico de los ros Pas y Pisuea. Apndice 2

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Figura 1. Localizacin de los tramos de muestreo en la cuenca.

En las grficas 1 al 8 se muestran las granulometras obtenidas en cada estacin


de muestreo dentro de la zona de estudio, perteneciendo cinco de ellas al cauce
del ro Pas y el resto al Pisuea.
Estudio Hidrulico de los ros Pas y Pisuea. Apndice 2

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Grfica 1.

Granulometra de la estacin de muestreo PA01

Grfica 2.

Granulometra de la estacin de muestreo PA02

Estudio Hidrulico de los ros Pas y Pisuea. Apndice 2

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Grfica 3.

Granulometra de la estacin de muestreo PA03

Grfica 4.

Granulometra de la estacin de muestreo PA04

Estudio Hidrulico de los ros Pas y Pisuea. Apndice 2

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Grfica 5.

Granulometra de la estacin de muestreo PA05

Grfica 6.

Granulometra de la estacin de muestreo PI01

Estudio Hidrulico de los ros Pas y Pisuea. Apndice 2

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Grfica 7.

Granulometra de la estacin de muestreo PI02

Grfica 8.

Granulometra de la estacin de muestreo PI03

Estudio Hidrulico de los ros Pas y Pisuea. Apndice 2

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

2.2. Usos del suelo


Para la determinacin de los coeficientes de rugosidad de las riberas inundables
de los ros Pas y Pisuea se han utilizado las equivalencias que se recogen en la
tabla 3 (modificada de Ven te Chow, 1994).
Uso de l sue lo N de Ma nning
bosque
0,123
brezal
0,053
helechal
0,030
matorral
0,085
pradera
0,035
prebosque
0,060
urbano
0,036
otros
0,080

Tabla 3. Nmero de Manning para cada uso del suelo.

En la figura 2 se indican los distintos usos del suelo en la cuenca.

Estudio Hidrulico de los ros Pas y Pisuea. Apndice 2

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Figura 2. Zonificacin de usos del suelo.


Estudio Hidrulico de los ros Pas y Pisuea. Apndice 2

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

3. COEFICIENTES DE RUGOSIDAD DEL CAUCE.


El clculo del nmero de Manning del cauce principal de ro se ha realizado
mediante la aplicacin de la ecuacin siguiente:
n = D90 (m) 1/6/26
En la tabla 4 se recogen los porcentajes de los diferentes tipos de material del
lechos y en la tabla 5 los valores correspondientes al D90 y al coeficiente de
rugosidad de Manning obtenido con la frmula anterior.
Estacin
PA01
PA02
PA03
PA04
PA05
PI01
PI02
PI03

Limos y arenas
10
12
12
10
0
8
10
0

Grava
10
12
19
10
0
13
20
0

Piedra + Raz
30
28
56
50
40
31
40
50

Cantos
60
74
83
85
90
69
75
80

Bloques
100
100
100
100
100
92
100
100

Losa
100
100
100
100
100
100
100
100

Tabla 4. Resultado de la asignacin de porcentajes acumulativas.

Lugar
PA01
PA02
PA03
PA04
PA05
PI01
PI02
PI03

D90 (mm)
256.4
235.6
207.3
197.3
160.0
284.0
233.3
219.1

n Strickler
0.0307
0.0302
0.0296
0.0293
0.0283
0.0312
0.0302
0.0299

Tabla 5. Resultados del D90 y coeficiente de rugosidad de Manning para cada estacin de muestreo.

4. COEFIECIENTES DE RUGOSIDAD DE LAS RIBERAS.


En las tablas 6 y 7 se recogen los usos del suelo en las inmediaciones del cauce y
los coeficientes de Manning adoptados como valores medios en ambas riberas de
los tramos indicados.

Estudio Hidrulico de los ros Pas y Pisuea. Apndice 2

10

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

RIO PAS

Nmero de Manning

Uso del suelo

PA100 a PA85

0.068

2/6bosque+3/6pradera+1/6prebosque

PA84 a PA81

0.035

medio pradera, medio urbano

PA80 a PA66

0.057

otro medio, medio pradera

PA65

0.036

urbano

PA64 a PA61

0.035

pradera

PA60

0.036

urbano

PA59 a PA56

0.035

pradera

PA55 a PA41.5

0.035

medio urbano, medio pradera

PA41 a PA15

0.080

otros

PA14 a PA0

0.07

otro medio , medio prebosque

Tabla 6. Coeficiente de Manning en las riberas para los distintos grupos de perfiles del Ro Pas.

RIO PISUEA

Nmero de Manning

Vegetacin de la llanura

PI400 a PI393

0.047

medio pradera, medio prebosque

PI392 a PI377

0.035

pradera

PI376 a PI365

0.053

2/5 urbano; 2/5 pradera; 1/5 Bosque

PI364 a PI362

0.035

pradera

PI361 a PI357

0.047

medio prebosque, medio pradera

PI356

0.035

pradera

PI355 a PI351

0.0355

medio urbano, medio pradera

PI350 a PI349

0.035

pradera

PI348 a PI344

0.035

2/3 urbano; 1/3 pradera

PI343 a PI331

0.06

prebosque

PI330 a PI323

0.0475

medio prebosque, medio pradera

PI322 a PI302

0.0355

medio urbano, medio pradera

PI301 a PI296

0.035

pradera

PI295

0.036

urbano

PI294 a PI285

0.035

pradera

PI284

0.047

medio pradera, medio prebosque

Tabla 7. Coeficiente de Manning en las riberas para los distintos grupos de perfiles del Ro Pisuea.

Estudio Hidrulico de los ros Pas y Pisuea. Apndice 2

11

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

APNDICE 3:
RESULTADOS NUMRICOS

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Resultados del modelo HEC-RAS


Perfil
(RS)

RO PAS

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

Froude
# Chl

100 T=500
100 T=100
100 T= 10

350 362.04 365.10


275 362.04 364.62
176 362.04 364.00

3.06
2.58
1.96

366.24 0.00534
365.69 0.00615
364.84 0.00684

4.96
4.74
4.15

1.11
1.09
0.89

1.13
1.07
0.92

92.41
71.40
48.70

0.91
0.95
0.96

99 T=500
99 T=100
99 T= 10

350 205.06 207.76


275 205.06 207.39
176 205.06 206.85

2.70
2.33
1.79

208.82 0.00624
208.34 0.00683
207.59 0.00772

4.63
4.34
3.82

0.57
0.41

0.91
0.81
0.51

85.71
68.70
47.44

0.95
0.97
0.98

94 T=500
94 T=100
94 T= 10

471 198.73 202.62


369 198.73 202.04
236 198.73 201.26

3.89
3.31
2.53

203.71 0.00450
203.16 0.00577
202.21 0.00755

4.75
4.72
4.31

0.66
0.50

0.71
0.50

129.33
86.26
54.73

0.84
0.92
1.00

93 T=500
93 T=100
93 T= 10

471 191.17 193.81


369 191.17 193.49
236 191.17 193.00

2.64
2.32
1.83

194.90 0.00687
194.41 0.00714
193.69 0.00792

4.69
4.31
3.72

1.32
1.23
1.11

1.27
1.12
0.91

108.58
91.86
66.92

1.00
0.99
1.00

92 T=500
92 T=100
92 T= 10

471 186.66 189.94


369 186.66 189.65
236 186.66 189.20

3.29
2.99
2.54

190.93 0.01137
190.49 0.01138
189.83 0.01081

4.36
3.95
3.38

4.42
4.14
3.64

0.52
0.21

107.44
91.09
67.17

0.95
0.93
0.90

91 T=500
91 T=100
91 T= 10

471 185.90 189.49


369 185.90 188.96
236 185.90 188.30

3.59
3.06
2.39

190.11 0.00320
189.58 0.00421
188.85 0.00616

3.57
3.53
3.33

0.74
0.77
0.77

0.69
0.65
0.58

153.81
116.36
75.40

0.70
0.77
0.88

89 T=500
89 T=100
89 T= 10

471 183.49 187.39


369 183.49 186.91
236 183.49 186.19

3.91
3.42
2.70

188.97 0.00593
188.26 0.00621
187.20 0.00682

5.68
5.24
4.52

1.24
1.15
0.95

1.43
1.32
1.13

94.22
78.73
56.70

0.99
0.99
0.99

88 T=500
88 T=100
88 T= 10

471 180.16 183.06


369 180.16 182.69
236 180.16 182.15

2.90
2.53
1.99

184.24 0.00648
183.70 0.00681
182.91 0.00758

4.88
4.50
3.90

1.10
0.99
0.81

1.19
1.08
0.89

104.82
87.68
63.28

0.99
0.99
0.99

87 T=500
87 T=100
87 T= 10

471 176.60 180.52


369 176.60 179.95
236 176.60 179.13

3.93
3.35
2.53

180.90 0.00149
180.30 0.00180
179.44 0.00259

2.77
2.66
2.49

0.80
0.79
0.79

0.64
0.60
0.53

184.52
148.67
99.92

0.50
0.53
0.59

86 T=500
86 T=100

471 175.57 179.08


369 175.57 178.63

3.51
3.07

180.48 0.00635
179.84 0.00678

5.27
4.88

0.83
0.65

0.70
0.47

93.09
76.89

0.98
0.98

Estudio Hidrulico de los ros Pas y Pisuea. Apndice 3

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

86 T= 10

236 175.57 177.97

2.40

178.89 0.00770

4.26

0.28

83 T=500
83 T=100
83 T= 10

471 165.67 168.00


369 165.67 167.73
236 165.67 167.35

2.33
2.06
1.68

168.88 0.00674
168.49 0.00701
167.91 0.00711

4.29
3.96
3.36

1.82
1.65
1.36

82 T=500
82 T=100
82 T= 10

471 162.86 165.39


369 162.86 165.08
236 162.86 164.62

2.53
2.22
1.76

166.36 0.00653
165.92 0.00693
165.27 0.00782

4.46
4.13
3.60

81 T=500
81 T=100
81 T= 10

471 155.88 158.53


369 155.88 158.23
236 155.88 157.78

2.65
2.36
1.90

159.46 0.00628
159.04 0.00651
158.40 0.00724

80 T=500
80 T=100
80 T= 10

471 141.58 143.95


369 141.58 143.65
236 141.58 143.18

3.84
3.54
3.07

79 T=500
79 T=100
79 T= 10

471 126.26 128.91


369 126.26 128.53
236 126.26 127.98

78 T=500
78 T=100
78 T= 10
77.3 T=500
77.3 T=100
77.3 T= 10
77.2

Froude
# Chl

55.44

1.00

2.41
2.11
1.56

117.57
99.43
74.37

0.99
0.98
0.95

1.94
1.74
1.40

2.36
2.21
1.97

110.99
93.16
67.61

0.98
0.99
1.00

4.45
4.11
3.58

2.21
2.01
1.67

2.21
2.05
1.81

116.46
97.71
70.23

0.97
0.96
0.97

144.94 0.00662
144.49 0.00691
143.83 0.00784

4.51
4.15
3.62

1.47
1.37
1.22

1.33
1.22
1.05

114.89
96.53
69.46

0.99
0.99
1.00

2.64
2.27
1.72

130.10 0.00614
129.56 0.00646
128.76 0.00714

4.95
4.57
3.96

1.45
1.33
1.13

1.50
1.39
1.20

105.21
87.97
63.57

0.99
0.99
0.99

471 118.08 120.44


369 118.08 120.10
236 118.08 119.61

2.36
2.02
1.53

121.38 0.00577
120.95 0.00633
120.28 0.00727

4.42
4.16
3.66

1.26
1.17
1.01

1.22
1.01
0.83

124.78
100.98
69.60

0.94
0.96
0.98

471 111.49 115.66


369 111.49 115.05
236 111.49 114.19

4.17
3.56
2.70

116.03 0.00113
115.39 0.00126
114.47 0.00147

2.82
2.66
2.36

0.92
0.81
0.64

0.69
0.69
0.58

200.24
162.54
112.01

0.45
0.46
0.48

Bridge

77 T=500
77 T=100
77 T= 10

521 111.49 114.33


411 111.49 113.97
267 111.49 113.42

2.84
2.48
1.93

115.51 0.00592
114.99 0.00624
114.21 0.00693

4.91
4.55
3.98

1.35
1.22
0.98

1.22
1.11
0.91

119.96
99.66
71.46

0.97
0.97
0.97

76 T=500
76 T=100
76 T= 10

521 105.26 108.32


411 105.26 108.01
267 105.26 107.51

3.05
2.74
2.24

109.25 0.00423
108.75 0.00391
108.01 0.00348

4.44
3.96
3.23

1.64
1.46
1.14

1.21
1.08
0.87

135.61
119.02
93.25

0.84
0.79
0.72

75 T=500
75 T=100

521 101.94 105.34


411 101.94 105.03

3.40
3.09

106.38 0.00659
105.92 0.00696

4.53
4.19

0.86
0.66

0.51
0.47

118.18
99.36

0.98
0.99

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

75 T= 10

267 101.94 104.56

2.62

105.24 0.00783

3.66

0.27

74 T=500
74 T=100
74 T= 10

521
411
267

90.39
90.39
90.39

93.18
92.88
92.41

2.80
2.50
2.03

94.27 0.00683
93.80 0.00701
93.11 0.00776

4.69
4.30
3.74

1.50
1.51
1.38

73 T=500
73 T=100
73 T= 10

521
411
267

81.79
81.79
81.79

84.79
84.42
83.87

3.00
2.63
2.08

85.63 0.00362
85.12 0.00358
84.36 0.00350

4.10
3.72
3.12

72 T=500
72 T=100
72 T= 10

521
411
267

80.95
80.95
80.95

83.60
83.24
82.71

2.66
2.30
1.76

84.80 0.00620
84.27 0.00655
83.49 0.00721

71 T=500
71 T=100
71 T= 10

586
464
305

79.85
79.85
79.85

83.21
82.79
82.20

3.36
2.94
2.36

70.9

Froude
# Chl

73.02

1.00

1.47
1.37
1.21

119.15
101.61
75.14

1.01
1.00
1.01

1.01
0.95
0.86

0.91
0.94
0.76

135.82
116.31
88.87

0.77
0.75
0.71

4.92
4.55
3.96

1.37
1.25
1.06

1.44
1.33
1.15

113.39
95.61
70.40

0.99
0.99
0.99

83.64 0.00218
83.17 0.00235
82.49 0.00246

2.92
2.73
2.39

0.68
0.59
0.42

0.89
0.84
0.73

206.25
173.75
129.84

0.56
0.57
0.56

Bridge

70.8 T=500
70.8 T=100
70.8 T= 10

586
464
305

79.85
79.85
79.85

82.98
82.58
82.03

3.13
2.74
2.19

83.49 0.00293
83.04 0.00310
82.38 0.00336

3.19
3.00
2.64

0.72
0.61
0.42

0.98
0.91
0.80

188.18
157.93
117.43

0.64
0.65
0.65

70 T=500
70 T=100
70 T= 10

586
464
305

78.50
78.50
78.50

81.44
81.11
80.61

2.94
2.60
2.10

82.58 0.00621
82.08 0.00653
81.36 0.00720

4.78
4.43
3.87

1.36
1.24
1.04

1.25
1.09
0.82

132.12
111.51
82.26

0.98
0.98
0.99

69 T=500
69 T=100
69 T= 10

586
464
305

77.41
77.41
77.41

80.35
80.10
79.57

2.93
2.69
2.16

81.29 0.00455
80.83 0.00393
80.09 0.00396

4.34
3.78
3.21

0.45
1.01
0.82

0.44
0.20
0.14

147.05
126.74
96.97

0.85
0.78
0.75

68 T=500
68 T=100
68 T= 10

586
464
305

76.49
76.49
76.49

79.25
78.81
78.30

2.80
2.35
1.85

80.34 0.00549
79.85 0.00666
79.09 0.00720

4.71
4.57
3.97

0.90
1.03
1.09

0.99
0.90
0.91

143.55
110.21
80.70

0.94
1.00
0.99

67 T=500
67 T=100
67 T= 10

586
464
305

75.25
75.25
75.25

78.25
77.68
76.94

2.99
2.42
1.69

78.68 0.00236
78.21 0.00379
77.57 0.00767

3.10
3.35
3.55

0.86
0.77
0.81

0.38
0.73
0.72

259.85
168.00
93.04

0.61
0.74
0.98

66 T=500
66 T=100

586
464

74.28
74.28

77.53
77.21

3.24
2.92

78.58 0.00650
78.13 0.00685

4.59
4.26

0.99
0.74

0.91
1.02

136.04
113.45

0.97
0.98

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

Froude
# Chl

66 T= 10

305

74.28

76.70

2.42

77.44 0.00805

3.80

0.98

0.84

81.65

1.01

65 T=500
65 T=100
65 T= 10

586
464
305

70.26
70.26
70.26

74.36
74.06
73.28

4.10
3.80
3.03

75.33 0.00393
74.90 0.00368
74.02 0.00412

5.28
4.84
4.37

2.15
1.95
1.97

2.44
2.08
2.06

164.02
141.69
93.90

0.85
0.81
0.82

64 T=500
64 T=100
64 T= 10

586
464
305

68.10
68.10
68.10

71.75
71.01
70.55

3.66
2.91
2.46

72.63 0.00342
72.14 0.00578
71.31 0.00493

4.39
4.82
3.91

1.06
1.62
1.25

1.86
1.98
1.65

170.12
104.22
82.08

0.77
0.96
0.86

63 T=500
63 T=100
63 T= 10

586
464
305

68.33
68.33
68.33

71.18
70.82
70.26

2.86
2.50
1.93

72.33 0.00573
71.83 0.00609
71.07 0.00709

4.85
4.52
4.03

1.39
1.11
0.86

2.13
1.95
1.72

130.66
108.61
77.98

0.96
0.96
0.99

62 T=500
62 T=100
62 T= 10

586
464
305

66.52
66.52
66.52

71.03
70.64
69.95

4.51
4.12
3.43

71.44 0.00124
70.97 0.00113
70.18 0.00104

2.99
2.66
2.22

1.46
1.25
1.01

1.48
1.33
1.16

222.35
196.00
151.41

0.48
0.45
0.41

61 T=500
61 T=100
61 T= 10

586
464
305

65.59
65.59
65.59

70.04
69.61
68.93

4.45
4.03
3.34

71.04 0.00642
70.58 0.00649
69.81 0.00706

4.55
4.44
4.16

1.49
1.27
0.89

2.12
1.78
1.17

138.18
110.64
75.13

0.95
0.95
0.97

60.2 T=500
60.2 T=100
60.2 T= 10

586
464
305

62.98
62.98
62.98

68.26
67.91
67.35

5.29
4.93
4.38

68.89 0.00172
68.41 0.00150
67.66 0.00109

3.79
3.34
2.59

1.53
1.44
1.08

1.23
1.12
1.17

199.21
170.99
136.45

0.57
0.53
0.44

60.1

Bridge

60 T=500
60 T=100
60 T= 10

586
464
305

62.98
62.98
62.98

68.08
67.45
66.47

5.11
4.48
3.50

68.80 0.00206
68.13 0.00232
67.11 0.00318

4.03
3.85
3.66

1.59
1.57
1.35

1.29
1.57
1.52

184.19
141.82
92.45

0.62
0.64
0.71

58 T=500
58 T=100
58 T= 10

586
464
305

59.66
59.66
59.66

65.55
65.17
64.80

5.90
5.51
5.14

67.24 0.00637
66.51 0.00592
65.56 0.00390

5.80
5.18
3.87

0.81
0.63
0.38

2.48
2.16
1.57

104.34
92.07
80.58

0.99
0.93
0.74

57 T=500
57 T=100
57 T= 10

586
464
305

60.84
60.84
60.84

65.57
65.11
64.44

4.73
4.27
3.60

67.01 0.00707
66.38 0.00760
65.44 0.00843

5.50
5.16
4.54

3.51
3.14
2.73

0.90
0.51

113.65
95.39
70.41

0.97
0.98
0.99

56 T=500
56 T=100

586
464

57.75
57.75

63.97
63.45

6.22
5.70

65.70 0.00621
64.96 0.00623

6.19
5.73

1.58
1.16

2.98
2.54

111.31
94.06

0.92
0.91

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

Froude
# Chl

56 T= 10

305

57.75

62.46

4.71

63.73 0.00738

5.17

0.82

2.30

65.38

0.94

55 T=500
55 T=100
55 T= 10

586
464
305

54.96
54.96
54.96

61.57
60.88
59.73

6.62
5.92
4.77

63.40 0.00464
62.58 0.00500
61.24 0.00610

6.33
6.01
5.52

2.31
1.98
1.27

2.72
2.45
1.95

110.40
88.61
58.90

0.86
0.88
0.93

54.2 T=500
54.2 T=100
54.2 T= 10

586
464
305

50.99
50.99
50.99

57.50
56.71
56.08

6.51
5.72
5.09

59.58 0.00363
58.48 0.00378
57.09 0.00262

6.41
5.91
4.48

0.75
0.71
0.54

1.01
0.92
0.68

95.03
81.13
70.09

0.86
0.86
0.70

54.1

Bridge

54 T=500
54 T=100
54 T= 10

586
464
305

50.99
50.99
50.99

56.97
56.30
56.03

5.98
5.31
5.04

59.51 0.00508
58.42 0.00511
57.07 0.00273

7.09
6.47
4.53

0.84
0.78
0.55

1.11
0.99
0.68

85.57
73.88
69.21

1.00
0.98
0.71

53 T=500
53 T=100
53 T= 10

586
464
305

53.00
53.00
53.00

56.90
56.29
55.60

3.90
3.29
2.60

58.12 0.00441
57.52 0.00555
56.59 0.00620

5.17
5.12
4.53

2.05
1.96
1.74

2.49
2.49
2.14

132.19
101.97
73.26

0.88
0.95
0.96

52 T=500
52 T=100
52 T= 10

586
464
305

50.52
50.52
50.52

56.64
55.82
54.64

6.12
5.30
4.11

57.42 0.00179
56.55 0.00211
55.28 0.00277

4.00
3.85
3.61

1.97
1.88
1.61

0.97
0.63

157.85
127.23
87.80

0.57
0.60
0.66

51 T=500
51 T=100
51 T= 10

586
464
305

49.52
49.52
49.52

54.41
53.69
52.76

4.89
4.18
3.24

56.58 0.00504
55.62 0.00559
54.22 0.00613

6.59
6.20
5.39

0.80
0.78
0.66

1.78
1.74
1.61

94.06
78.13
58.63

0.99
1.01
1.01

50 T=500
50 T=100
50 T= 10

586
464
305

49.61
49.61
49.61

53.00
52.86
52.05

3.39
3.25
2.44

54.07 0.00400
53.62 0.00298
52.67 0.00355

4.69
3.93
3.52

0.94
0.72
1.53

1.17
0.98
1.40

144.19
131.80
89.84

0.83
0.71
0.74

49 T=500
49 T=100
49 T= 10

586
464
305

48.08
48.08
48.08

52.37
51.70
50.83

4.29
3.62
2.75

53.47 0.00355
52.97 0.00488
51.91 0.00583

5.16
5.37
4.84

1.95
1.90
1.80

2.11
1.98
2.38

151.93
109.29
72.10

0.81
0.92
0.96

48 T=500
48 T=100
48 T= 10

586
464
305

46.90
46.90
46.90

50.28
50.09
49.72

3.38
3.19
2.82

50.59 0.00204
50.33 0.00167
49.93 0.00157

3.31
2.87
2.55

1.29
1.20
0.95

1.28
1.11
0.98

323.48
278.04
204.50

0.59
0.53
0.50

47 T=500
47 T=100

586
464

45.39
45.39

49.00
48.53

3.61
3.14

49.55 0.00258
49.24 0.00346

4.04
4.26

1.06
1.09

1.48
1.99

271.19
164.04

0.68
0.77

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

Froude
# Chl

47 T= 10

305

45.39

47.68

2.28

48.62 0.00615

4.57

1.96

2.33

76.56

0.98

46 T=500
46 T=100
46 T= 10

586
464
305

41.96
41.96
41.96

45.63
45.31
44.81

3.68
3.35
2.85

46.63 0.00344
46.08 0.00295
45.30 0.00234

4.70
4.09
3.26

1.69
1.88
1.63

1.97
1.71
1.37

152.38
131.11
104.34

0.79
0.72
0.62

45 T=500
45 T=100
45 T= 10

586
464
305

40.20
40.20
40.20

43.25
42.97
42.59

3.05
2.78
2.40

44.13 0.00688
43.74 0.00756
43.19 0.00855

4.17
3.91
3.43

1.00
1.05
0.55

2.31
2.27
2.19

143.34
120.37
89.77

1.00
1.01
1.03

44.3 T=500
44.3 T=100
44.3 T= 10

586
464
305

38.12
38.12
38.12

42.96
42.35
41.60

4.84
4.23
3.48

43.46 0.00137
42.80 0.00151
41.92 0.00153

3.16
2.97
2.53

1.15
1.01
0.74

1.04
0.93
0.71

192.43
160.48
122.34

0.51
0.52
0.50

44.2

Bridge

44 T=500
44 T=100
44 T= 10

586
464
305

38.12
38.12
38.12

42.67
41.82
41.02

4.55
3.70
2.90

43.25 0.00177
42.46 0.00269
41.56 0.00356

3.42
3.54
3.27

1.21
1.10
0.74

1.10
1.03
0.76

177.03
133.42
94.02

0.57
0.67
0.73

43 T=500
43 T=100
43 T= 10

586
464
305

37.74
37.74
37.74

42.65
41.68
40.65

4.91
3.94
2.91

42.91 0.00068
41.98 0.00103
40.95 0.00155

2.48
2.61
2.56

1.32
1.35
1.22

1.37
1.42
1.29

286.92
211.74
138.05

0.37
0.43
0.50

42 T=500
42 T=100
42 T= 10

586
464
305

37.34
37.34
37.34

42.27
41.29
40.35

4.93
3.96
3.02

42.79 0.00115
41.83 0.00157
40.77 0.00179

3.28
3.29
2.90

1.39
1.40
1.25

1.07
1.07
0.92

190.07
148.21
109.29

0.48
0.54
0.55

41.7 T=500
41.7 T=100
41.7 T= 10

586
464
305

36.78
36.78
36.78

42.42
41.41
40.40

5.65
4.64
3.62

42.61 0.00040
41.61 0.00055
40.57 0.00063

2.10
2.15
1.94

1.05
1.06
0.95

1.02
0.99
0.80

341.13
256.69
180.92

0.29
0.33
0.34

586 36.78 42.29


464 36.78 41.29
305 36.78 40.31
350 362.04 365.10

5.51
4.51
3.54
3.06

0.00044
0.00061
0.00069
0.00534

2.17
2.23
1.99
4.96

1.08
1.10
0.98
1.11

1.04
1.02
0.81
1.13

329.55
246.81
175.15
92.41

0.30
0.34
0.35
0.91

42.05 0.00252
41.04 0.00234
40.03 0.00219

5.16
4.52
3.87

1.13
0.99
0.84

1.08
0.95
0.81

230.79
194.82
158.24

0.72
0.68
0.64

41.6
41.5
41.5
41.5
100

Bridge
T=500
T=100
T= 10
T=500

41 T=500
41 T=100
41 T= 10

1007
758
538

35.36
35.36
35.36

40.75
40.05
39.30

5.39
4.69
3.94

42.49
41.50
40.50
366.24

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

Froude
# Chl

40 T=500
40 T=100
40 T= 10

1007
758
538

33.01
33.01
33.01

38.50
37.85
37.22

5.49
4.84
4.21

39.54 0.00253
38.67 0.00248
37.83 0.00232

4.55
4.05
3.47

0.74
0.63
0.50

0.87
0.75
0.61

241.79
200.73
163.17

0.69
0.67
0.63

39 T=500
39 T=100
39 T= 10

1007
758
538

32.63
32.63
32.63

37.61
36.75
35.97

4.97
4.12
3.34

38.66 0.00270
37.70 0.00330
36.80 0.00405

4.61
4.38
4.06

1.09
1.05
1.01

0.19
0.17
0.16

238.95
186.78
140.98

0.72
0.76
0.81

38 T=500
38 T=100
38 T= 10

1007
758
538

31.88
31.88
31.88

37.94
37.08
36.28

6.06
5.20
4.40

38.49 0.00112
37.53 0.00118
36.62 0.00119

3.28
2.97
2.60

0.35
0.24
0.09

0.37
0.27
0.13

311.98
256.38
206.81

0.46
0.46
0.45

37.6

Bridge

37 T=500
37 T=100
37 T= 10

1007
758
538

31.97
31.97
31.97

37.25
36.63
36.00

5.28
4.66
4.02

37.96 0.00161
37.17 0.00148
36.38 0.00133

3.74
3.26
2.75

0.44
0.31
0.17

0.54
0.43
0.30

278.90
237.60
197.44

0.55
0.52
0.48

36 T=500
36 T=100
36 T= 10

1007
758
538

32.08
32.08
32.08

36.94
36.29
35.66

4.85
4.21
3.58

37.66 0.00192
36.88 0.00193
36.11 0.00192

3.79
3.40
2.96

0.43
0.37
0.33

0.67
0.55
0.42

282.61
231.91
186.23

0.60
0.58
0.56

35.2

Bridge

35.1 T=500
35.1 T=100
35.1 T= 10

1007
758
538

32.08
32.08
32.08

36.23
35.74
35.25

4.15
3.66
3.17

37.30 0.00363
36.57 0.00347
35.86 0.00325

4.60
4.05
3.47

0.55
0.46
0.37

0.73
0.59
0.44

227.25
191.80
157.46

0.80
0.76
0.71

35 T=500
35 T=100
35 T= 10

1007
758
538

32.04
32.04
32.04

36.12
35.63
35.16

4.08
3.59
3.12

37.13 0.00337
36.42 0.00312
35.72 0.00273

4.76
4.17
3.51

1.38
1.19
0.99

0.94
0.80
0.66

285.60
240.59
198.46

0.79
0.74
0.67

34 T=500
34 T=100
34 T= 10

1007
758
538

32.35
32.35
32.35

36.14
35.53
34.96

3.92
3.31
2.74

36.63 0.00272
35.95 0.00304
35.30 0.00342

3.97
3.68
3.33

1.40
1.30
1.17

0.94
0.85
0.71

469.03
378.49
294.37

0.69
0.71
0.72

33 T=500
33 T=100
33 T= 10

1007
758
538

29.69
29.69
29.69

33.52
32.96
32.40

3.83
3.26
2.71

35.06 0.00542
34.25 0.00582
33.45 0.00632

5.58
5.11
4.58

1.04
0.90
0.75

1.18
1.06
0.93

204.42
163.73
126.06

0.98
0.98
0.99

32 T=500

1014

27.71

32.62

4.91

33.41 0.00207

4.01

0.71

0.45

319.09

0.63

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

Froude
# Chl

32 T=100
32 T= 10

785
541

27.71
27.71

32.39
31.59

4.68
3.88

32.94 0.00153
32.01 0.00157

3.32
2.90

0.57
0.42

0.31
0.48

285.05
205.55

0.53
0.52

30 T=500
30 T=100
30 T= 10

1014
785
541

26.15
26.15
26.15

31.71
30.80
30.18

5.56
4.64
4.03

32.23 0.00143
31.65 0.00260
30.79 0.00230

3.55
4.14
3.46

0.56
0.56
0.39

0.40
0.38
0.23

583.55
217.37
167.31

0.52
0.68
0.62

29 T=500
29 T=100
29 T= 10

1014
785
541

26.28
26.28
26.28

30.71
30.22
29.69

4.44
3.94
3.42

31.97 0.00375
31.36 0.00387
30.53 0.00338

5.24
4.87
4.09

0.75
0.58
0.47

0.85
0.75
0.59

310.00
225.60
151.68

0.84
0.83
0.75

28 T=500
28 T=100
28 T= 10

1014
785
541

23.67
23.67
23.67

27.94
27.69
27.17

4.27
4.02
3.50

28.23 0.00258
27.97 0.00254
27.53 0.00339

3.09
2.92
3.02

1.59
1.39
1.26

0.55
0.46
0.39

744.20
581.12
314.37

0.52
0.51
0.57

27 T=500
27 T=100
27 T= 10

1014
785
541

23.60
23.60
23.60

27.78
27.59
26.89

4.96
4.77
4.06

27.92 0.00045
27.69 0.00037
27.02 0.00088

1.62
1.42
1.85

2.46
2.05
1.99

0.42 1324.97
0.38 1145.92
0.83 417.68

0.28
0.25
0.37

26 T=500
26 T=100
26 T= 10

1014
785
541

21.75
21.75
21.75

26.77
26.13
25.52

5.02
4.38
3.76

27.52 0.00252
27.25 0.00384
26.34 0.00357

4.40
4.88
4.14

0.54
1.15
0.91

0.61
0.63
0.66

584.34
223.69
164.14

0.68
0.82
0.77

25 T=500
25 T=100
25 T= 10

1014
785
541

19.66
19.66
19.66

24.95
24.53
23.75

5.29
4.87
4.09

25.85 0.00263
25.38 0.00263
24.50 0.00287

4.51
4.22
3.83

0.34
0.30

0.57
0.38
0.12

450.20
298.85
141.26

0.68
0.67
0.68

24 T=500
24 T=100
24 T= 10

1014
785
541

16.70
16.70
16.70

24.86
24.68
23.59

8.16
7.98
6.89

25.19 0.00079
24.91 0.00056
23.97 0.00098

2.93
2.41
2.75

0.27
0.21
0.16

0.39 1050.74
0.36 896.92
0.33 201.10

0.40
0.33
0.42

23 T=500
23 T=100
23 T= 10

1014
785
541

18.74
18.74
18.74

24.20
23.10
22.62

5.46
4.36
3.88

24.90 0.00205
24.53 0.00494
23.55 0.00395

4.14
5.32
4.29

0.48
0.45
0.39

0.40
0.60
0.37

645.96
156.64
128.34

0.62
0.92
0.81

22 T=500
22 T=100
22 T= 10

1014
785
541

18.13
18.13
18.13

23.98
23.31
22.60

5.85
5.19
4.47

24.67 0.00208
23.95 0.00240
23.10 0.00260

3.73
3.54
3.13

0.53
0.71
0.54

0.50
0.45
0.35

312.54
228.42
176.41

0.60
0.62
0.62

18.13

23.16

5.03

24.33 0.00471

4.80

0.75

0.59

219.02

0.87

21.9

Bridge

21.8 T=500

1014

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

Froude
# Chl

21.8 T=100
21.8 T= 10

785
541

18.13
18.13

22.65
22.20

4.52
4.07

23.65 0.00516
22.90 0.00462

4.46
3.72

0.78
0.54

0.51
0.37

179.80
147.44

0.88
0.81

21 T=500
21 T=100
21 T= 10

1014
785
541

18.49
18.49
18.49

22.35
22.13
21.46

3.86
3.64
2.97

23.72 0.00598
23.10 0.00472
22.30 0.00609

5.20
4.37
4.07

0.77
0.62
0.43

0.61
0.46
0.16

200.25
183.11
133.43

0.99
0.87
0.94

20 T=500
20 T=100
20 T= 10

1014
785
541

13.73
13.73
13.73

22.48
22.22
21.50

8.75
8.49
7.76

22.88 0.00116
22.50 0.00087
21.70 0.00084

2.83
2.34
1.99

0.29
0.24
0.17

0.63
0.57
0.51

386.08
359.12
287.15

0.45
0.38
0.36

19.9

Bridge

19.8 T=500
19.8 T=100
19.8 T= 10

1014
785
541

13.73
13.73
13.73

22.22
22.08
21.39

8.49
8.35
7.65

22.68 0.00145
22.38 0.00098
21.60 0.00095

3.02
2.43
2.07

0.31
0.26
0.17

0.73
0.62
0.52

358.69
344.96
276.19

0.50
0.40
0.38

19 T=500
19 T=100
19 T= 10

1049
809
555

18.05
18.05
18.05

21.41
20.88
20.54

3.36
2.83
2.49

22.17 0.00330
21.89 0.00482
21.18 0.00368

4.18
4.47
3.56

0.50
0.46
0.34

0.66
0.61
0.31

464.90
197.65
163.64

0.75
0.88
0.75

18 T=500
18 T=100
18 T= 10

1049
809
555

17.08
17.08
17.08

20.30
20.00
19.90

3.22
2.92
2.82

20.88 0.00284
20.52 0.00279
20.25 0.00181

3.73
3.44
2.70

0.57
0.49
0.38

0.67
0.53
0.70

549.11
423.40
260.71

0.69
0.68
0.54

17 T=500
17 T=100
17 T= 10

1049
809
555

14.56
14.56
14.56

18.32
18.11
17.63

3.76
3.55
3.07

18.83 0.00338
18.58 0.00309
18.36 0.00496

3.86
3.51
3.87

0.63
0.51
0.06

0.67
0.55
0.53

703.03
569.69
183.68

0.74
0.70
0.86

16 T=500
16 T=100
16 T= 10

1049
809
555

12.45
12.45
12.45

16.42
16.08
15.78

3.97
3.64
3.34

16.93 0.00322
16.63 0.00353
16.26 0.00312

4.31
4.20
3.68

0.45
0.30
0.12

0.74
0.71
0.56

804.81
579.55
417.50

0.76
0.78
0.72

15 T=500
15 T=100
15 T= 10

1049
809
555

10.77
10.77
10.77

15.29
15.03
14.06

4.53
4.26
3.30

16.16 0.00319
15.78 0.00284
15.05 0.00516

4.71
4.23
4.57

0.58
0.50
0.41

0.61
0.54
0.84

582.67
426.64
160.75

0.78
0.73
0.93

13 T=500
13 T=100
13 T= 10

1049
809
555

9.84
9.84
9.84

14.35
13.69
13.05

4.52
3.86
3.21

14.54 0.00090
13.97 0.00123
13.29 0.00134

2.42
2.50
2.23

1.78
2.30
2.17

0.37
0.29
0.17

731.41
417.31
254.21

0.40
0.45
0.45

12 T=500

1049

7.52

13.53

6.02

14.03 0.00119

3.47

0.36

0.75

527.63

0.49

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

Froude
# Chl

12 T=100
12 T= 10

809
555

7.52
7.52

12.81
11.94

5.29
4.43

13.33 0.00142
12.52 0.00186

3.42
3.37

0.26
0.02

0.60
0.22

383.53
165.95

0.53
0.58

11 T=500
11 T=100
11 T= 10

1049
809
555

6.82
6.82
6.82

10.94
10.64
10.19

4.12
3.83
3.38

12.42 0.00434
11.72 0.00347
10.89 0.00267

5.47
4.64
3.70

0.75
0.57
0.36

0.73
0.48
0.35

224.75
194.67
151.83

0.90
0.79
0.68

10 T=500
10 T=100
10 T= 10

1049
809
555

6.14
6.14
6.14

10.49
10.04
9.54

4.35
3.90
3.40

11.17 0.00309
10.69 0.00342
10.05 0.00338

4.26
4.05
3.52

2.29
2.30
1.99

0.81
1.21
0.72

359.04
253.79
195.90

0.76
0.78
0.75

7 T=500
7 T=100
7 T= 10

1049
809
555

4.91
4.91
4.91

10.01
9.40
8.62

5.35
4.74
3.96

10.19 0.00094
9.59 0.00112
8.79 0.00152

2.43
2.33
2.19

1.33
1.24
1.09

1.48
1.76
1.69

617.83
436.71
314.18

0.42
0.44
0.49

6 T=500
6 T=100
6 T= 10

1049
809
555

4.54
4.54
4.54

9.32
8.85
8.21

4.79
4.31
3.67

9.97 0.00157
9.38 0.00144
8.58 0.00127

3.64
3.23
2.68

0.43
0.31
0.12

0.33
0.26
0.10

387.02
276.31
207.55

0.56
0.53
0.48

5 T=500
5 T=100
5 T= 10

1049
809
555

3.28
3.28
3.28

8.81
8.31
7.73

5.60
5.10
4.52

9.16 0.00096
8.63 0.00094
7.95 0.00077

3.00
2.76
2.25

1.02
1.27
1.34

0.34
0.27
0.16

619.19
398.01
281.76

0.44
0.43
0.38

4 T=500
4 T=100
4 T= 10

1049
809
555

1.83
1.83
1.83

7.91
7.57
7.30

6.08
5.75
5.47

8.72 0.00182
8.23 0.00154
7.68 0.00094

4.19
3.67
2.75

0.85
0.60
0.41

0.47
0.38
0.26

350.32
277.04
229.29

0.61
0.55
0.43

3 T=500
3 T=100
3 T= 10

1049
809
555

1.75
1.75
1.75

8.03
7.68
7.35

6.55
6.19
5.87

8.19 0.00037
7.80 0.00030
7.42 0.00018

2.01
1.71
1.28

0.44
0.38
0.35

1.00
0.89
0.71

795.12
670.84
574.63

0.28
0.25
0.19

2 T=500
2 T=100
2 T= 10

1049
809
555

0.18
0.18
0.18

7.87
7.55
7.27

7.68
7.37
7.09

7.98 0.00043
7.63 0.00033
7.32 0.00020

2.24
1.90
1.42

0.99
0.85
0.65

0.29
0.22
0.15

906.64
805.37
718.11

0.29
0.26
0.20

1 T=500
1 T=100
1 T= 10

1049
809
555

-1.02
-1.02
-1.02

7.50
7.29
7.14

8.52
8.32
8.16

7.83 0.00057
7.52 0.00040
7.26 0.00021

2.85
2.34
1.68

0.50
0.38
0.26

0.24
0.20
0.14

738.47
677.69
630.76

0.35
0.29
0.21

0.9 T=500
0.9 T=100
0.9 T= 10

1049
809
555

-0.71
-0.71
-0.71

7.37
7.22
7.11

8.08
7.93
7.81

7.59 0.00028
7.36 0.00018
7.17 0.00009

2.16
1.71
1.19

0.50
0.39
0.27

0.22
0.17
0.12

593.77
578.08
565.64

0.25
0.20
0.14

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

10

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

Froude
# Chl

0.8 T=500
0.8 T=100
0.8 T= 10

1049
809
555

0.28
0.28
0.28

7.36
7.21
7.10

7.08
6.93
6.82

7.52 0.00025
7.32 0.00016
7.15 0.00008

1.95
1.56
1.10

0.35
0.27
0.19

0.40
0.32
0.22

962.57
916.30
881.05

0.24
0.19
0.14

0.7 T=500
0.7 T=100
0.7 T= 10

1049
809
555

-0.14
-0.14
-0.14

7.06
7.04
7.02

7.20
7.18
7.16

7.40 0.00043
7.24 0.00026
7.11 0.00012

2.66
2.06
1.42

0.66
0.51
0.35

0.33
0.26
0.17

535.55
531.57
528.34

0.32
0.25
0.17

0.6 T=500
0.6 T=100
0.6 T= 10

1049
809
555

-0.12
-0.12
-0.12

7.13
7.08
7.04

7.25
7.20
7.16

7.30 0.00027
7.18 0.00016
7.09 0.00008

2.09
1.63
1.13

0.49
0.38
0.26

0.49
0.38
0.26

898.76
886.92
877.72

0.25
0.20
0.14

0.5 T=500
0.5 T=100
0.5 T= 10

1049
809
555

-0.35
-0.35
-0.35

7.07
7.04
7.02

7.42
7.39
7.37

7.22 0.00021
7.13 0.00013
7.06 0.00006

1.87
1.45
1.00

0.31
0.24
0.17

0.33
0.25
0.17

975.34
965.56
958.06

0.22
0.17
0.12

0.4 T=500
0.4 T=100
0.4 T= 10

1049
809
555

-0.80
-0.80
-0.80

7.00
7.00
7.00

7.80
7.80
7.80

7.14 0.00021
7.08 0.00013
7.04 0.00006

1.88
1.45
0.99

0.34
0.26
0.18

0.31 1169.83
0.24 1169.83
0.17 1169.83

0.23
0.18
0.12

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

11

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Resultados del modelo HEC-RAS


Perfil
(RS)

RO PISUEA

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

400
400
400

T=500
T=100
T= 10

75
61
42

267.38 269.57 2.19


267.38 269.31 1.94
267.38 268.93 1.56

270.47
270.12
269.58

0.00721 4.37
0.00762 4.11
0.00828 3.65

399
399
399

T=500
T=100
T= 10

75
61
42

263.01 265.29 2.28


263.01 265.06 2.05
263.01 264.72 1.71

266.12
265.80
265.31

0.01034 4.03
0.01065 3.80
0.01103 3.40

398
398
398

T=500
T=100
T= 10

75
61
42

261.09 264.33 3.24


261.09 263.97 2.88
261.09 263.43 2.35

265.14
264.66
263.96

0.00363 4.02
0.00369 3.72
0.00371 3.21

397
397
397

T=500
T=100
T= 10

75
61
42

261.14 264.59 3.45


261.14 264.16 3.03
261.14 263.54 2.40

264.94
264.49
263.81

396.9

1.43
1.33
1.16

Froude
# Chl

1.42
1.32
1.16

19.90
16.90
12.72

0.98
0.98
0.98

0.19

18.63
16.06
12.35

1.01
1.01
1.00

0.50
0.46
0.39

0.60
0.57
0.50

20.23
17.60
13.85

0.74
0.73
0.70

0.00160 2.71
0.00176 2.58
0.00208 2.35

0.87
0.82
0.75

0.60
0.56
0.48

32.00
26.86
19.73

0.49
0.50
0.52

Bridge

396.8
396.8
396.8

T=500
T=100
T= 10

75
61
42

261.14 263.46 2.32


261.14 263.21 2.07
261.14 262.83 1.69

264.40
264.03
263.49

0.00765 4.38
0.00803 4.10
0.00879 3.64

1.41
1.32
1.19

0.89
0.81
0.66

18.80
16.13
12.28

1.00
1.00
1.00

396
396
396

T=500
T=100
T= 10

75
61
42

255.10 257.33 2.23


255.10 257.12 2.02
255.10 256.79 1.69

258.14
257.83
257.36

0.00790 4.07
0.00815 3.79
0.00902 3.39

1.11
0.97
0.72

1.40
1.30
1.14

20.32
17.42
13.09

0.99
0.98
0.99

395
395
395

T=500
T=100
T= 10

75
61
42

246.85 249.72 2.87


246.85 249.36 2.51
246.85 248.74 1.88

249.98
249.60
248.97

0.00148 2.30
0.00166 2.21
0.00245 2.17

0.76
0.72
0.64

0.65
0.58
0.46

37.78
31.04
20.70

0.45
0.47
0.54

394.9

Bridge

394.8
394.8
394.8

T=500
T=100
T= 10

75
61
42

246.85 248.73 1.88


246.85 248.51 1.66
246.85 248.20 1.34

249.48
249.19
248.74

0.00742 3.89
0.00794 3.67
0.00886 3.28

1.11
0.98
0.73

0.80
0.66
0.36

20.61
17.44
13.10

0.97
0.98
0.99

394
394

T=500
T=100

75
61

243.83 245.75 1.92


243.83 245.55 1.72

246.52
246.22

0.00916 3.89
0.00952 3.64

0.09

0.38
0.17

19.33
16.75

1.01
1.01

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

12

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

394

T= 10

42

243.83 245.21 1.38

245.77

0.00996 3.32

393
393
393

T=500
T=100
T= 10

75
61
42

241.72 243.13 1.41


241.72 243.00 1.28
241.72 242.75 1.03

243.67
243.47
243.15

0.00914 3.26
0.00937 3.03
0.01009 2.78

0.16

392
392
392

T=500
T=100
T= 10

75
61
42

238.05 239.72 1.67


238.05 239.56 1.51
238.05 239.33 1.28

240.34
240.10
239.75

0.00887 3.48
0.00936 3.25
0.01008 2.88

391
391
391

T=500
T=100
T= 10

75
61
42

232.80 239.97 7.17


232.80 239.72 6.92
232.80 239.34 6.54

240.01
239.75
239.35

Froude
# Chl

12.63

1.00

0.24
0.11

23.02
20.12
15.12

1.01
1.00
1.01

0.75
0.54

0.34
0.24

21.66
18.78
14.60

1.00
1.01
1.01

0.00014 0.87
0.00011 0.75
0.00007 0.56

0.11
0.04

0.13
0.09
0.02

86.39
81.57
74.66

0.13
0.11
0.09

Inl
Struct

390.9
390.8
390.8
390.8

T=500
T=100
T= 10

75
61
42

232.80 237.79 4.99


232.80 237.54 4.74
232.80 237.17 4.37

237.92
237.64
237.23

0.00045 1.61
0.00038 1.41
0.00026 1.08

0.23
0.14
0.11

0.39
0.33
0.25

48.59
44.80
39.63

0.27
0.24
0.20

390
390
390

T=500
T=100
T= 10

75
61
42

235.62 237.15 1.54


235.62 236.98 1.36
235.62 236.71 1.10

237.85
237.58
237.19

0.00848 3.71
0.00885 3.46
0.00965 3.06

0.41
0.34
0.21

1.03
0.96
0.84

20.51
17.85
13.85

1.01
1.00
1.01

389
389
389

T=500
T=100
T= 10

75
61
42

234.39 236.85 2.47


234.39 236.65 2.27
234.39 236.34 1.96

237.11
236.87
236.49

0.00192 2.28
0.00180 2.06
0.00157 1.71

0.70
0.52
0.18

0.68
0.57
0.40

34.01
30.31
24.77

0.50
0.48
0.43

387
387
387

T=500
T=100
T= 10

75
61
42

231.39 236.94 5.55


231.39 236.73 5.34
231.39 236.40 5.01

237.01
236.78
236.43

0.00032 1.20
0.00026 1.05
0.00018 0.80

0.40
0.33
0.24

0.44
0.38
0.28

65.49
60.92
54.06

0.20
0.18
0.15

386
386
386

T=500
T=100
T= 10

75
61
42

231.23 236.97 5.74


231.23 236.75 5.52
231.23 236.41 5.18

237.00
236.78
236.43

0.00011 0.89
0.00009 0.76
0.00005 0.56

0.27
0.22
0.16

0.40
0.34
0.25

92.86
87.89
80.46

0.13
0.11
0.08

231.23 233.60 2.37


231.23 233.36 2.13

233.99
233.71

0.00327 2.78
0.00353 2.62

0.39
0.38

0.82
0.71

27.59
23.68

0.66
0.67

Inl
Struct

385.9
385.8
385.8

T=500
T=100

75
61

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

13

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

Froude
# Chl

385.8

T= 10

42

231.23 233.00 1.77

233.28

0.00403 2.35

0.36

0.51

18.06

0.69

385
385
385

T=500
T=100
T= 10

75
61
42

230.72 232.69 1.97


230.72 232.46 1.74
230.72 232.11 1.39

233.49
233.18
232.70

0.00678 4.19
0.00704 3.93
0.00773 3.53

1.94
1.81
1.61

2.02
1.89
1.67

20.69
17.68
13.25

0.97
0.97
0.97

384
384
384

T=500
T=100
T= 10

75
61
42

229.24 232.08 2.84


229.24 231.90 2.66
229.24 231.62 2.38

232.30
232.07
231.73

0.00129 2.13
0.00112 1.88
0.00084 1.49

0.92
0.80
0.62

0.43
0.37
0.29

37.45
34.27
29.54

0.44
0.40
0.34

383.9

Bridge

383.8
383.8
383.8

T=500
T=100
T= 10

75
61
42

229.24 231.99 2.75


229.24 231.84 2.59
229.24 231.58 2.34

232.23
232.02
231.70

0.00147 2.21
0.00123 1.94
0.00089 1.52

0.95
0.82
0.63

0.44
0.38
0.29

35.91
33.18
28.92

0.46
0.42
0.35

382.2
382.2
382.2

T=500
T=100
T= 10

75
61
42

226.00 232.13 6.13


226.00 231.94 5.94
226.00 231.65 5.65

232.17
231.97
231.67

0.00013 0.82
0.00010 0.70
0.00006 0.53

0.09
0.07
0.05

0.28
0.22
0.15

94.59
89.29
81.27

0.13
0.12
0.09

20.12
17.27
13.31

1.01
1.01
1.00

Inl
Struct

382.1
382
382
382

T=500
T=100
T= 10

75
61
42

226.00 228.49 2.49


226.00 228.29 2.29
226.00 228.00 2.00

229.20
228.93
228.51

0.01005 3.73
0.01041 3.53
0.01073 3.16

381
381
381

T=500
T=100
T= 10

75
61
42

225.14 226.96 1.82


225.14 226.79 1.65
225.14 226.50 1.36

227.63
227.37
226.98

0.00839 3.64
0.00869 3.40
0.00929 3.08

1.12
0.96
0.63

0.18

20.84
18.09
13.69

1.00
1.00
1.00

380
380
380

T=500
T=100
T= 10

150
124
84

221.26 225.14 3.88


221.26 224.84 3.58
221.26 224.43 3.17

225.98
225.66
225.09

0.00754 4.08
0.00903 4.01
0.00968 3.61

0.89
0.28

0.49

37.94
30.93
23.26

0.94
1.00
1.00

379
379
379

T=500
T=100
T= 10

150
124
84

221.41 223.84 2.43


221.41 223.49 2.08
221.41 223.06 1.65

224.48
224.22
223.70

0.00502 3.66
0.00703 3.84
0.00830 3.54

0.47

1.20
1.10
0.55

47.43
34.57
23.96

0.82
0.94
0.98

378
378
378

T=500
T=100
T= 10

150
124
84

219.74 222.53 2.80


219.74 222.26 2.53
219.74 221.66 1.92

223.19
222.94
222.35

0.00484 3.68
0.00576 3.67
0.00859 3.70

0.75
0.34

1.13
0.69

47.36
36.26
22.70

0.81
0.86
1.00

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

14

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

Froude
# Chl

377
377
377

T=500
T=100
T= 10

150
124
84

217.98 220.81 2.83


217.98 220.60 2.63
217.98 219.93 1.95

221.11
220.98
220.55

0.00272 2.79
0.00346 2.95
0.00790 3.52

0.82
0.76
1.36

0.42
0.13

88.95
61.50
24.62

0.61
0.67
0.96

376
376
376

T=500
T=100
T= 10

150
124
84

216.06 218.45 2.39


216.06 218.27 2.21
216.06 217.90 1.84

219.07
218.84
218.42

0.00582 3.71
0.00602 3.52
0.00696 3.26

1.03
0.92
0.72

0.29
0.22

54.65
45.68
30.04

0.87
0.87
0.90

375
375
375

T=500
T=100
T= 10

150
124
84

212.60 215.70 3.09


212.60 215.50 2.90
212.60 215.12 2.52

216.34
216.10
215.66

0.00473 4.64
0.00459 4.37
0.00455 3.93

1.28
1.18
1.01

1.45
1.37
1.23

70.13
59.56
41.46

0.87
0.84
0.82

374
374
374

T=500
T=100
T= 10

150
124
84

211.97 214.72 2.75


211.97 214.42 2.45
211.97 213.82 1.85

215.15
214.80
214.15

0.00223 3.04
0.00230 2.86
0.00285 2.63

1.01
0.95
0.88

0.99
0.93
0.85

58.68
50.74
36.09

0.59
0.59
0.62

373.9

Bridge

373.8
373.8
373.8

T=500
T=100
T= 10

150
124
84

211.97 213.96 2.00


211.97 213.74 1.77
211.97 213.35 1.39

214.86
214.54
213.98

0.00694 4.33
0.00723 4.07
0.00787 3.59

1.44
1.36
1.20

1.40
1.31
1.15

39.54
34.27
25.67

0.99
0.99
0.99

373
373
373

T=500
T=100
T= 10

150
124
84

209.10 212.70 3.61


209.10 211.85 2.75
209.10 211.23 2.13

213.18
212.82
212.10

0.00220 3.56
0.00552 4.66
0.00682 4.32

1.13
1.50
1.40

0.57
1.19
1.29

94.12
35.71
23.60

0.61
0.92
0.98

372
372
372

T=500
T=100
T= 10

150
124
84

207.62 210.05 2.43


207.62 209.99 2.37
207.62 209.57 1.94

211.18
210.82
210.24

0.00776 5.01
0.00581 4.27
0.00607 3.78

1.49
1.24
0.84

1.57
1.33
1.16

38.48
37.17
26.95

1.07
0.92
0.90

371
371
371

T=500
T=100
T= 10

150
124
84

207.47 210.08 2.60


207.47 209.54 2.06
207.47 209.30 1.82

210.86
210.56
209.96

0.00492 4.21
0.00848 4.68
0.00643 3.73

0.84
1.34
0.98

1.22
1.33
1.02

53.59
32.88
27.05

0.86
1.08
0.92

370
370
370

T=500
T=100
T= 10

150
124
84

202.42 205.13 2.70


202.42 204.68 2.26
202.42 204.28 1.85

205.86
205.53
204.95

0.00548 3.83
0.00818 4.08
0.00899 3.63

0.53
0.74
0.54

44.99
30.75
23.21

0.84
1.00
1.01

369
369
369

T=500
T=100
T= 10

150
124
84

199.33 201.70 2.38


199.33 201.65 2.32
199.33 201.25 1.93

202.62
202.33
201.84

0.00719 4.78
0.00544 4.09
0.00573 3.67

1.48
1.27
1.14

47.54
45.42
31.93

1.02
0.89
0.88

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

1.51
1.29
1.06

15

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

Froude
# Chl

368
368
368

T=500
T=100
T= 10

150
124
84

197.88 199.95 2.06


197.88 199.76 1.88
197.88 199.43 1.55

200.73
200.45
199.97

0.00770 4.00
0.00795 3.75
0.00875 3.31

1.54
1.47
1.36

1.14
1.06
0.92

40.76
35.70
27.06

1.00
1.00
1.00

367
367
367

T=500
T=100
T= 10

150
124
84

196.34 198.67 2.33


196.34 198.46 2.12
196.34 198.10 1.76

198.80
198.57
198.19

0.00112 1.69
0.00117 1.60
0.00127 1.42

0.60
0.57
0.51

0.73
0.66
0.53

106.98
93.08
69.94

0.39
0.39
0.39

366.9

Bridge

366.8
366.8
366.8

T=500
T=100
T= 10

150
124
84

196.34 197.83 1.49


196.34 197.71 1.36
196.34 197.50 1.16

198.33
198.15
197.84

0.00903 3.25
0.00954 3.07
0.01024 2.69

1.18
1.12
1.00

1.23
1.21
1.16

53.10
45.82
34.63

1.01
1.02
1.01

366
366
366

T=500
T=100
T= 10

150
124
84

194.55 196.65 2.10


194.55 196.48 1.93
194.55 196.17 1.62

197.24
197.03
196.64

0.00678 3.54
0.00729 3.38
0.00864 3.08

0.91
0.84
0.78

1.15
1.09
0.97

52.47
43.57
30.18

0.93
0.94
0.98

365
365
365

T=500
T=100
T= 10

150
124
84

193.05 194.85 1.80


193.05 194.64 1.59
193.05 194.34 1.29

195.52
195.27
194.83

0.00715 3.72
0.00810 3.59
0.00895 3.18

1.09
1.35
1.23

1.39
1.36
1.24

45.91
38.04
28.68

0.96
1.00
1.00

364
364
364

T=500
T=100
T= 10

150
124
84

188.89 191.08 2.18


188.89 190.96 2.06
188.89 190.39 1.50

191.28
191.20
190.86

0.00256 2.32
0.00298 2.37
0.00915 3.05

0.37
0.37
0.68

0.63
0.54
1.46

114.24
82.06
27.94

0.58
0.62
1.00

363
363
363

T=500
T=100
T= 10

150
124
84

185.65 188.57 2.92


185.65 188.50 2.85
185.65 188.30 2.65

188.86
188.76
188.55

0.00530 3.06
0.00482 2.84
0.00488 2.64

1.52
1.37
1.15

1.28
1.11
1.00

78.57
70.20
48.05

0.75
0.71
0.71

362
362
362

T=500
T=100
T= 10

150
124
84

183.08 184.21 1.90


183.08 184.17 1.86
183.08 184.03 1.72

184.44
184.36
184.22

0.00838 3.17
0.00727 2.87
0.00774 2.70

1.44
1.29
1.20

1.45
1.32
1.25

86.73
78.96
54.61

0.98
0.90
0.91

361
361
361

T=500
T=100
T= 10

150
124
84

179.15 182.03 2.88


179.15 181.93 2.78
179.15 181.47 2.32

182.34
182.23
181.93

0.00380 3.20
0.00353 3.01
0.00564 3.33

0.82
0.75
1.06

105.67
89.06
36.68

0.69
0.66
0.82

360
360
360

T=500
T=100
T= 10

150
124
84

177.50 179.80 2.30


177.50 179.61 2.11
177.50 179.31 1.80

180.41
180.19
179.78

0.00637 3.53
0.00662 3.42
0.00644 3.09

0.54
0.52
0.46

45.74
38.25
28.57

0.98
1.00
1.00

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

1.59
1.52
1.34

16

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

359
359
359

T=500
T=100
T= 10

150
124
84

175.54 178.29 2.75


175.54 178.11 2.57
175.54 177.78 2.23

178.98
178.73
178.29

0.00625 4.02
0.00603 3.77
0.00576 3.33

358
358
358

T=500
T=100
T= 10

150
124
84

173.93 175.57 1.64


173.93 175.38 1.45
173.93 175.11 1.18

176.04
175.86
175.51

0.00644 3.13
0.00794 3.13
0.00960 2.84

357.2
357.2
357.2

T=500
T=100
T= 10

150
124
84

171.08 173.62 2.54


171.08 173.33 2.25
171.08 172.83 1.75

173.95
173.62
173.05

357.1

Froude
# Chl

1.58
1.37
0.97

48.08
42.03
31.11

0.91
0.88
0.84

0.66
0.46
1.05

1.28
1.29
1.21

56.07
43.04
30.50

0.88
0.95
1.00

0.00172 2.56
0.00179 2.40
0.00189 2.09

0.42
0.40
0.35

0.85
0.78
0.68

61.71
54.12
41.61

0.51
0.51
0.50

Bridge

357
357
357

T=500
T=100
T= 10

150
124
84

171.08 172.72 1.64


171.08 172.52 1.44
171.08 172.20 1.11

173.53
173.24
172.75

0.00762 4.01
0.00796 3.76
0.00870 3.31

0.67
0.63
0.55

1.30
1.22
1.07

38.70
33.92
25.95

1.00
1.00
1.00

356
356
356

T=500
T=100
T= 10

150
124
84

168.24 170.67 2.43


168.24 170.40 2.16
168.24 169.92 1.68

171.32
171.07
170.55

0.00518 3.69
0.00625 3.69
0.00834 3.52

1.21
0.95
0.87

0.57
0.17

47.15
36.86
24.23

0.82
0.88
0.98

355
355
355

T=500
T=100
T= 10

150
124
84

166.87 168.94 2.07


166.87 168.79 1.92
166.87 168.56 1.69

169.35
169.19
168.91

0.00454 3.34
0.00476 3.23
0.00452 2.86

1.43
1.28
0.97

1.08
1.05
0.94

64.87
54.77
40.14

0.79
0.80
0.76

354
354
354

T=500
T=100
T= 10

150
124
84

165.65 166.81 1.15


165.65 166.73 1.08
165.65 166.60 0.94

166.90
166.82
166.67

0.00393 1.83
0.00398 1.73
0.00392 1.51

0.86
0.81
0.70

1.18
1.11
0.98

114.58
100.26
76.43

0.64
0.64
0.61

353
353
353

T=500
T=100
T= 10

150
124
84

165.44 166.58 1.14


165.44 166.51 1.07
165.44 166.39 0.95

166.82
166.73
166.58

0.01387 2.77
0.01414 2.63
0.01569 2.40

1.90
1.83
1.74

1.89
1.81
1.69

72.56
62.67
45.47

1.14
1.13
1.15

352
352
352

T=500
T=100
T= 10

150
124
84

160.20 161.87 1.67


160.20 161.77 1.57
160.20 161.59 1.40

162.26
162.12
161.88

0.00677 3.26
0.00665 3.06
0.00617 2.69

1.83
1.66
1.32

1.21
1.04
0.78

62.97
55.09
41.94

0.90
0.88
0.83

351
351
351

T=500
T=100
T= 10

226
189
131

155.16 158.22 3.06


155.16 157.49 2.33
155.16 157.03 1.87

158.63
158.46
157.82

0.00238 3.33
0.00653 4.56
0.00709 4.08

1.09
2.12
1.87

0.79
2.29
2.05

124.38
46.21
35.09

0.62
0.98
0.98

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

17

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

Froude
# Chl

350
350
350

T=500
T=100
T= 10

226
189
131

151.19 153.78 2.59


151.19 153.64 2.46
151.19 152.94 1.76

154.28
154.12
153.61

0.00371 3.40
0.00361 3.21
0.00817 3.66

0.97
0.79
1.95

0.93
1.08
0.85

92.48
77.25
36.79

0.73
0.71
1.00

349
349
349

T=500
T=100
T= 10

226
189
131

142.00 145.67 3.67


142.00 144.95 2.95
142.00 144.23 2.23

146.12
145.87
145.13

0.00205 3.45
0.00473 4.50
0.00666 4.37

0.86
1.39
2.12

1.58
2.08
2.02

116.14
51.28
32.99

0.59
0.86
0.97

348
348
348

T=500
T=100
T= 10

226
189
131

138.88 141.89 3.01


138.88 141.85 2.97
138.88 141.04 2.16

142.37
142.22
141.73

0.00331 3.68
0.00258 3.20
0.00627 3.93

1.46
1.33
2.02

0.78
0.72
1.39

109.08
99.19
39.30

0.72
0.63
0.92

347.2
347.2
347.2

T=500
T=100
T= 10

226
189
131

138.70 141.45 2.75


138.70 141.16 2.47
138.70 140.67 1.98

141.84
141.51
140.94

0.00224 2.76
0.00226 2.59
0.00226 2.27

82.00
72.99
57.77

0.55
0.54
0.53

54.36
48.16
37.52

1.00
1.00
1.00

347.1

Bridge

347
347
347

T=500
T=100
T= 10

226
189
131

138.70 140.56 1.87


138.70 140.36 1.66
138.70 140.01 1.31

141.44
141.15
140.63

0.00818 4.16
0.00840 3.92
0.00899 3.49

346
346
346

T=500
T=100
T= 10

226
189
131

137.21 139.89 2.69


137.21 139.78 2.57
137.21 139.52 2.32

140.29
140.15
139.89

0.00391 3.34
0.00378 3.16
0.00397 2.95

1.59
1.47
1.28

1.11
0.98
0.70

107.89
93.00
62.90

0.74
0.72
0.72

345
345
345

T=500
T=100
T= 10

226
189
131

136.09 138.28 2.19


136.09 138.12 2.03
136.09 137.88 1.79

138.55
138.45
138.21

0.00308 2.84
0.00376 2.96
0.00401 2.78

0.98
0.94
0.83

0.61
0.72
0.87

142.05
106.01
67.48

0.65
0.71
0.72

344
344
344

T=500
T=100
T= 10

226
189
131

132.13 134.13 2.00


132.13 133.97 1.84
132.13 133.71 1.58

134.65
134.39
134.06

0.00549 3.57
0.00501 3.20
0.00494 2.83

0.86
1.70
1.44

1.28
1.46
1.22

90.31
75.39
57.30

0.86
0.81
0.78

343
343
343

T=500
T=100
T= 10

226
189
131

130.85 132.82 1.97


130.85 132.67 1.82
130.85 132.33 1.48

133.41
133.21
132.82

0.00522 3.72
0.00514 3.50
0.00576 3.22

1.16
1.10
1.04

0.91
0.79
0.64

93.90
80.83
53.80

0.85
0.83
0.85

342
342
342

T=500
T=100
T= 10

226
189
131

130.62 131.71 2.75


130.62 131.61 2.64
130.62 131.28 2.32

132.18
132.02
131.69

0.01271 3.64
0.01303 3.41
0.02288 3.30

1.44
1.55
1.51

1.64
1.64
2.25

92.21
79.10
49.90

1.18
1.17
1.44

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

18

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

Froude
# Chl

341
341
341

T=500
T=100
T= 10

226
189
131

129.21 131.27 2.14


129.21 130.94 1.81
129.21 130.47 1.34

131.45
131.13
130.67

0.00177 2.15
0.00235 2.19
0.00380 2.21

0.76
0.84
0.95

0.60
0.61
0.53

157.11
123.14
78.92

0.50
0.55
0.66

340
340
340

T=500
T=100
T= 10

226
189
131

126.20 129.23 3.03


126.20 128.93 2.72
126.20 128.39 2.19

130.59
130.13
129.35

0.00645 5.29
0.00667 4.98
0.00724 4.42

1.49
1.44
1.33

1.31
1.22
1.06

48.96
43.00
32.91

1.01
1.01
1.01

339
339
339

T=500
T=100
T= 10

226
189
131

123.01 126.83 3.82


123.01 126.57 3.56
123.01 126.13 3.12

127.29
126.98
126.44

0.00288 3.06
0.00294 2.87
0.00297 2.50

0.99
0.90
0.77

0.37
0.31
0.18

79.04
69.96
55.02

0.62
0.61
0.60

338
338
338

T=500
T=100
T= 10

226
189
131

120.15 122.72 2.57


120.15 122.46 2.31
120.15 121.99 1.84

123.89
123.50
122.82

0.00656 4.87
0.00677 4.59
0.00737 4.08

1.25
1.18
1.02

1.14
1.02
0.80

51.01
44.83
34.21

0.99
0.99
0.99

337
337
337

T=500
T=100
T= 10

226
189
131

117.24 122.96 5.71


117.24 122.64 5.39
117.24 122.08 4.84

123.02
122.69
122.12

0.00023 1.13
0.00022 1.04
0.00020 0.87

0.38
0.35
0.29

0.32
0.30
0.26

217.83
197.26
162.32

0.19
0.18
0.17

336
336
336

T=500
T=100
T= 10

226
189
131

113.13 122.98 9.86


113.13 122.66 9.53
113.13 122.10 8.98

123.01
122.68
122.11

0.00002 0.71
0.00002 0.62
0.00001 0.46

0.19
0.16
0.12

0.16
0.14
0.11

427.74
409.71
378.98

0.07
0.06
0.05

335
335
335

T=500
T=100
T= 10

226
189
131

119.74 121.96 2.22


119.74 121.74 2.00
119.74 121.37 1.64

122.90
122.58
122.04

0.00736 4.43
0.00762 4.18
0.00823 3.70

1.39
1.33
1.19

0.91
0.83
0.71

58.91
51.73
39.67

1.01
1.01
1.01

334.2
334.2
334.2

T=500
T=100
T= 10

226
189
131

117.65 121.76 4.10


117.65 121.44 3.78
117.65 120.89 3.23

122.05
121.69
121.08

0.00118 2.43
0.00119 2.27
0.00118 1.97

0.62
0.55
0.38

0.63
0.58
0.48

100.96
89.55
70.24

0.43
0.43
0.41

334.1

Bridge

334
334
334

T=500
T=100
T= 10

226
189
131

117.65 121.56 3.90


117.65 121.27 3.62
117.65 120.77 3.11

121.89
121.56
120.99

0.00147 2.60
0.00145 2.42
0.00142 2.08

0.64
0.56
0.36

0.67
0.61
0.50

93.86
83.74
66.08

0.48
0.47
0.45

333
333
333

T=500
T=100
T= 10

226
189
131

118.23 121.33 3.10


118.23 121.06 2.83
118.23 120.59 2.36

121.82
121.49
120.92

0.00247 3.14
0.00248 2.93
0.00251 2.54

0.65
0.58
0.43

0.82
0.76
0.67

76.84
68.20
53.60

0.62
0.61
0.59

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

19

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

332.9

Froude
# Chl

Bridge

332.8
332.8
332.8

T=500
T=100
T= 10

226
189
131

118.23 120.61 2.38


118.23 120.39 2.16
118.23 120.02 1.79

121.56
121.24
120.70

0.00723 4.34
0.00756 4.10
0.00829 3.65

0.74
0.62
0.35

1.14
1.08
0.97

54.15
47.62
36.74

1.00
1.00
1.01

332
332
332

T=500
T=100
T= 10

226
189
131

107.09 111.28 4.19


107.09 110.88 3.80
107.09 110.44 3.35

112.19
111.75
111.05

0.00384 4.29
0.00430 4.16
0.00381 3.47

0.56
0.78
0.59

0.86
0.74
0.52

62.18
49.69
39.63

0.77
0.80
0.73

331
331
331

T=500
T=100
T= 10

226
189
131

107.31 110.07 2.76


107.31 109.99 2.69
107.31 109.51 2.20

111.29
110.91
110.24

0.00705 5.07
0.00552 4.39
0.00585 3.89

1.29
1.19
1.03

1.28
1.12
1.02

53.98
51.20
38.39

1.03
0.91
0.90

330
330
330

T=500
T=100
T= 10

294
245
169

103.47 106.69 3.22


103.47 106.30 2.83
103.47 105.84 2.37

107.54
107.19
106.51

0.00421 4.41
0.00511 4.42
0.00490 3.79

1.08
1.06
1.37

1.13
1.37
1.16

96.84
71.58
53.32

0.82
0.88
0.84

329
329
329

T=500
T=100
T= 10

294
245
169

102.41 106.51 4.10


102.41 106.38 3.97
102.41 105.30 2.89

106.93
106.71
105.98

0.00185 3.41
0.00152 3.02
0.00387 3.80

0.49
0.83
1.51

0.75
0.64
0.67

188.53
162.63
54.81

0.57
0.51
0.77

328.9

Bridge

328.8
328.8
328.8

T=500
T=100
T= 10

294
245
169

102.41 106.31 3.90


102.41 105.69 3.28
102.41 105.15 2.74

106.86
106.64
105.94

0.00244 3.81
0.00456 4.59
0.00474 4.08

1.11
1.51
1.61

0.78
0.86
0.79

150.70
75.60
49.26

0.65
0.86
0.85

328
328
328

T=500
T=100
T= 10

294
245
169

98.91
98.91
98.91

102.74 3.83
102.61 3.70
101.36 2.45

103.19
103.03
102.38

0.00205 3.46
0.00189 3.23
0.00670 4.48

0.68
0.56
0.76

0.62
0.58
0.76

181.64
154.38
39.21

0.59
0.56
0.98

327
327
327

T=500
T=100
T= 10

294
245
169

98.92
98.92
98.92

100.95 2.04
100.87 1.95
100.69 1.77

101.76
101.48
101.04

0.00568 4.02
0.00458 3.50
0.00304 2.68

0.62
0.51
0.36

1.51
1.31
1.00

77.19
73.48
65.91

0.90
0.81
0.65

326
326
326

T=500
T=100
T= 10

294
245
169

98.66
98.66
98.66

100.90 2.24
100.73 2.07
100.41 1.75

101.60
101.36
100.94

0.00658 3.85
0.00679 3.64
0.00755 3.28

1.06
0.86
0.84

1.36
1.25
1.03

90.11
77.82
56.96

0.94
0.94
0.96

325

T=500

294

95.67

99.31

100.05

0.00333 3.87

0.39

1.18

83.80

0.73

3.64

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

20

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

Froude
# Chl

325
325

T=100
T= 10

245
169

95.67
95.67

99.05
98.63

3.38
2.96

99.69
99.08

0.00326 3.60
0.00287 3.00

0.36
0.29

1.00
0.71

74.15
59.55

0.71
0.65

324
324
324

T=500
T=100
T= 10

294
245
169

96.07
96.07
96.07

98.02
97.91
97.66

1.95
1.84
1.59

98.83
98.56
98.10

0.00718 4.08
0.00622 3.64
0.00533 3.00

1.49
1.30
1.05

1.60
1.48
1.28

78.28
72.79
60.12

0.99
0.91
0.82

323
323
323

T=500
T=100
T= 10

294
245
169

93.98
93.98
93.98

97.19
96.88
96.52

3.22
2.90
2.54

97.57
97.36
96.99

0.00241 3.40
0.00316 3.62
0.00330 3.36

1.04
0.94
0.75

0.92
1.19
1.09

164.32
124.65
81.95

0.63
0.71
0.71

322
322
322

T=500
T=100
T= 10

294
245
169

93.20
93.20
93.20

95.51
95.41
94.99

2.31
2.21
1.79

96.40
96.12
95.64

0.00646 4.48
0.00537 3.95
0.00629 3.67

1.85
1.63
1.51

1.51
1.51
1.46

83.65
75.26
50.93

0.97
0.88
0.92

321
321
321

T=500
T=100
T= 10

294
245
169

91.93
91.93
91.93

94.22
94.09
93.81

2.29
2.16
1.88

95.10
94.83
94.36

0.00952 4.22
0.00889 3.84
0.00914 3.34

0.95
0.85
0.70

1.74
2.01
2.12

73.38
66.05
51.86

1.10
1.05
1.02

320
320
320

T=500
T=100
T= 10

294
245
169

91.49
91.49
91.49

94.06
93.92
93.57

2.57
2.44
2.08

94.83
94.58
94.13

0.00777 3.95
0.00732 3.61
0.00899 3.32

0.85
0.66
0.56

1.97
1.83
1.75

78.45
70.10
51.45

1.00
0.96
1.01

319
319
319

T=500
T=100
T= 10

294
245
169

90.75
90.75
90.75

93.20
93.03
92.60

2.45
2.28
1.84

94.16
93.84
93.29

0.00671 4.48
0.00636 4.12
0.00740 3.75

1.80
1.65
1.70

2.19
2.01
1.83

72.80
65.06
47.53

0.98
0.94
0.98

318
318
318

T=500
T=100
T= 10

294
245
169

88.58
88.58
88.58

92.04
91.70
91.12

3.46
3.12
2.55

92.41
92.04
91.39

0.00151 2.75
0.00162 2.62
0.00172 2.32

0.72
0.59
0.23

1.25
1.21
1.09

119.31
100.43
74.76

0.50
0.50
0.50

317.9

Bridge

317.8
317.8
317.8

T=500
T=100
T= 10

294
245
169

88.58
88.58
88.58

91.50
91.28
90.88

2.93
2.70
2.30

92.08
91.77
91.22

0.00301 3.41
0.00286 3.13
0.00256 2.62

0.66
0.45

1.58
1.46
1.24

91.00
81.13
65.78

0.68
0.65
0.60

317
317
317

T=500
T=100
T= 10

294
245
169

88.09
88.09
88.09

90.59
90.37
90.02

2.50
2.29
1.93

91.47
91.17
90.65

0.00720 4.24
0.00762 4.01
0.00809 3.56

0.96
0.70

2.38
2.29
2.08

71.85
62.88
48.54

1.00
1.01
1.00

316

T=500

294

85.11

88.68

3.57

89.29

0.00282 3.94

1.78

1.13

116.60

0.69

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

21

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

316
316

T=100
T= 10

245
169

85.11
85.11

88.44
87.69

3.33
2.59

89.07
88.43

0.00298 3.85
0.00453 3.94

315
315
315

T=500
T=100
T= 10

294
245
169

79.42
79.42
79.42

82.31
82.04
81.54

2.90
2.62
2.12

83.43
83.04
82.36

0.00720 4.68
0.00736 4.45
0.00783 4.02

314
314
314

T=500
T=100
T= 10

294
245
169

78.91
78.91
78.91

81.77
81.59
81.26

2.86
2.67
2.34

82.14
81.91
81.49

0.00289 2.84
0.00272 2.62
0.00242 2.22

1.46
1.31
1.04

313.9

1.73
1.73

1.03
1.82

Froude
# Chl

91.41
47.27

0.70
0.83

62.81
55.06
42.00

1.00
1.00
1.00

1.81
1.67
1.41

114.15
102.79
82.89

0.63
0.60
0.56

1.99
1.82
1.52

103.09
93.70
76.33

0.72
0.68
0.62

195.99
172.13
131.92

0.52
0.49
0.42

Bridge

313.8
313.8
313.8

T=500
T=100
T= 10

294
245
169

78.91
78.91
78.91

81.59
81.44
81.15

2.68
2.52
2.23

82.05
81.82
81.42

0.00388 3.14
0.00356 2.87
0.00309 2.41

1.57
1.40
1.08

313
313
313

T=500
T=100
T= 10

355
291
195

77.94
77.94
77.94

81.26
81.12
80.87

3.32
3.18
2.92

81.54
81.36
81.05

0.00179 2.67
0.00163 2.47
0.00127 2.05

1.01
0.85
0.56

312
312
312

T=500
T=100
T= 10

355
291
195

78.29
78.29
78.29

80.56
80.48
80.30

2.27
2.18
2.00

80.92
80.79
80.57

0.00794 2.98
0.00756 2.77
0.00782 2.49

1.51
1.31
1.03

1.79
1.59
1.25

150.19
132.73
97.13

0.92
0.88
0.87

311
311
311

T=500
T=100
T= 10

355
291
195

75.58
75.58
75.58

79.26
78.95
78.41

3.68
3.37
2.83

79.48
79.13
78.54

0.00081 2.09
0.00076 1.90
0.00068 1.57

0.78
0.80
0.69

0.89
0.79
0.63

179.05
160.07
128.35

0.37
0.35
0.32

310
310
310

T=500
T=100
T= 10

355
291
195

75.34
75.34
75.34

78.83
78.55
78.03

3.49
3.21
2.69

79.30
78.96
78.37

0.00288 3.35
0.00290 3.16
0.00310 2.87

2.31
2.11
1.75

122.84
107.54
80.56

0.66
0.65
0.65

309
309
309

T=500
T=100
T= 10

355
291
195

74.38
74.38
74.38

77.29
76.97
76.50

2.91
2.60
2.12

78.17
77.80
77.15

0.00489 4.37
0.00532 4.18
0.00566 3.67

2.01
1.96
1.71

1.97
1.83
1.52

92.39
77.78
57.61

0.87
0.89
0.88

308.2
308.2
308.2

T=500
T=100
T= 10

355
291
195

74.32
74.32
74.32

77.30
76.98
76.46

2.98
2.66
2.14

77.89
77.49
76.85

0.00295 3.41
0.00308 3.19
0.00323 2.76

0.96
0.77
0.34

0.52
0.45
0.32

105.64
91.94
70.71

0.67
0.67
0.66

308.1

Bridge

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

22

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

Froude
# Chl

308
308
308

T=500
T=100
T= 10

355
291
195

74.32
74.32
74.32

76.83
76.59
76.14

2.51
2.27
1.82

77.71
77.34
76.72

0.00569 4.16
0.00567 3.84
0.00617 3.36

0.90
0.63

0.56
0.47
0.29

85.93
76.06
58.09

0.90
0.88
0.88

307
307
307

T=500
T=100
T= 10

355
291
195

72.08
72.08
72.08

74.58
74.29
73.85

2.51
2.21
1.78

75.69
75.28
74.58

0.00632 4.78
0.00666 4.50
0.00659 3.84

2.20
2.06
1.73

2.33
2.19
1.87

79.44
68.63
53.21

0.98
0.99
0.95

306.2
306.2
306.2

T=500
T=100
T= 10

355
291
195

71.40
71.40
71.40

74.40
74.10
73.56

3.00
2.69
2.16

74.90
74.53
73.89

0.00225 3.23
0.00224 3.00
0.00226 2.58

1.59
1.47
1.26

1.41
1.30
1.20

121.06
105.66
80.04

0.60
0.59
0.57

306.1

Bridge

306
306
306

T=500
T=100
T= 10

355
291
195

71.40
71.40
71.40

74.29
73.98
73.45

2.88
2.57
2.04

74.83
74.46
73.82

0.00261 3.39
0.00266 3.16
0.00275 2.75

1.48
1.55
1.34

1.48
1.37
1.34

116.11
99.63
74.87

0.65
0.64
0.63

305
305
305

T=500
T=100
T= 10

355
291
195

69.88
69.88
69.88

73.14
72.79
72.28

3.26
2.91
2.40

73.92
73.50
72.82

0.00396 4.03
0.00435 3.84
0.00456 3.34

2.22
2.15
1.94

1.65
1.52
1.23

94.41
80.49
61.31

0.79
0.81
0.79

304
304
304

T=500
T=100
T= 10

355
291
195

69.52
69.52
69.52

71.98
71.81
71.38

2.46
2.28
1.85

73.06
72.67
72.00

0.00634 4.76
0.00555 4.23
0.00526 3.57

2.41
2.15
1.82

2.37
2.11
1.78

80.77
74.07
58.14

0.98
0.91
0.85

303
303
303

T=500
T=100
T= 10

355
291
195

66.86
66.86
66.86

70.53
70.00
69.44

3.67
3.14
2.58

71.16
70.87
70.16

0.00300 3.99
0.00468 4.42
0.00506 3.93

1.35
1.87
2.07

1.13
1.55
1.50

136.17
81.02
55.34

0.71
0.86
0.86

302
302
302

T=500
T=100
T= 10

355
291
195

63.01
63.01
63.01

65.71
65.58
65.24

2.69
2.56
2.23

66.15
65.98
65.64

0.00453 3.34
0.00436 3.13
0.00501 2.96

0.55
0.33

1.37
1.23
0.98

153.73
127.21
81.01

0.79
0.77
0.80

301
301
301

T=500
T=100
T= 10

355
291
195

62.43
62.43
62.43

64.09
63.80
63.37

2.27
1.99
1.55

64.11
63.83
63.41

0.00042 0.93
0.00064 1.00
0.00161 1.20

0.62
0.67
0.84

0.49
0.47
0.29

546.67
410.54
218.78

0.24
0.28
0.42

300
300
300

T=500
T=100
T= 10

355
291
195

61.11
61.11
61.11

63.59
63.38
63.12

2.48
2.27
2.01

64.06
63.78
63.37

0.00335 3.08
0.00329 2.84
0.00255 2.25

1.50
1.37
1.07

0.58
0.38
0.38

122.64
106.96
89.42

0.69
0.68
0.58

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

23

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

Froude
# Chl

299
299
299

T=500
T=100
T= 10

389
319
215

58.50
58.50
58.50

61.14
61.03
60.71

2.63
2.52
2.21

61.56
61.40
61.11

0.00515 3.68
0.00480 3.41
0.00578 3.30

1.16
0.95
0.65

2.01
1.86
1.73

167.58
145.57
91.57

0.84
0.81
0.86

298
298
298

T=500
T=100
T= 10

389
319
215

55.37
55.37
55.37

59.37
59.13
58.71

4.00
3.76
3.34

59.42
59.18
58.78

0.00044 1.72
0.00048 1.73
0.00063 1.83

0.65
0.61
0.54

0.81
0.80
0.74

472.28
393.29
263.34

0.28
0.29
0.33

297
297
297

T=500
T=100
T= 10

389
319
215

55.10
55.10
55.10

58.28
58.06
57.72

3.18
2.96
2.61

58.99
58.72
58.26

0.00388 4.46
0.00384 4.23
0.00343 3.67

2.06
1.81
1.32

1.28
1.20
1.08

130.48
112.04
84.86

0.80
0.79
0.73

296.5
296.5
296.5

T=500
T=100
T= 10

389
319
215

53.64
53.64
53.64

56.66
56.46
55.94

3.02
2.82
2.30

57.15
56.96
56.46

0.00281 3.53
0.00289 3.42
0.00356 3.27

1.84
1.74
1.57

1.06
0.86
1.36

167.29
134.66
71.02

0.67
0.67
0.72

296.2
296.2
296.2

T=500
T=100
T= 10

389
319
215

52.52
52.52
52.52

56.07
55.88
55.58

3.54
3.36
3.05

56.28
56.10
55.78

0.00138 2.75
0.00140 2.67
0.00132 2.43

1.03
1.00
0.90

1.06
0.95
0.75

258.34
219.12
156.15

0.48
0.48
0.46

296.1

Bridge

296
296
296

T=500
T=100
T= 10

389
319
215

52.52
52.52
52.52

55.69
55.63
55.26

3.17
3.10
2.74

56.20
56.03
55.74

0.00323 3.90
0.00256 3.42
0.00299 3.37

1.45
1.27
1.24

1.28
1.09
0.92

180.05
166.40
96.26

0.73
0.64
0.68

295
295
295

T=500
T=100
T= 10

389
319
215

51.29
51.29
51.29

54.29
54.15
53.70

3.00
2.87
2.42

54.78
54.60
54.24

0.00328 3.75
0.00299 3.46
0.00389 3.48

1.15
1.03
0.87

1.34
1.23
1.20

183.90
156.08
85.72

0.72
0.68
0.76

294
294
294

T=500
T=100
T= 10

389
319
215

48.80
48.80
48.80

52.70
52.28
51.46

3.90
3.48
2.66

53.36
53.07
52.36

0.00291 4.19
0.00377 4.38
0.00581 4.44

1.98
2.09
2.17

1.41
1.43
2.02

144.87
102.25
55.68

0.71
0.79
0.93

293
293
293

T=500
T=100
T= 10

389
319
215

46.50
46.50
46.50

51.39
51.31
50.49

4.89
4.81
4.00

51.76
51.58
50.72

0.00109 2.98
0.00080 2.54
0.00080 2.21

0.70
0.59
0.99

1.36
1.15
0.99

197.79
185.19
112.77

0.45
0.39
0.37

292
292
292

T=500
T=100
T= 10

389
319
215

46.83
46.83
46.83

50.96
49.98
49.31

4.12
3.15
2.48

51.45
51.14
50.28

0.00191 3.65
0.00521 5.01
0.00593 4.51

0.97
1.58
2.07

1.02
2.29
2.12

191.60
75.31
52.33

0.59
0.92
0.95

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

24

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

291.2
291.2
291.2

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

45.00
45.00
45.00

50.12
49.64
48.82

5.12
4.63
3.82

50.82
50.27
49.34

0.00225 3.83
0.00236 3.62
0.00258 3.23

0.93
0.70

1.86
1.63
1.09

111.50
95.33
70.16

0.59
0.59
0.59

T=500
T=100
T= 10

291.1

389
319
215

Froude
# Chl

Bridge

291
291
291

T=500
T=100
T= 10

389
319
215

45.00
45.00
45.00

49.90
49.47
48.72

4.90
4.46
3.72

50.70
50.17
49.28

0.00273 4.07
0.00279 3.82
0.00289 3.35

0.91
0.65

1.92
1.66
1.06

104.13
89.88
67.27

0.64
0.64
0.63

290
290
290

T=500
T=100
T= 10

389
319
215

44.12
44.12
44.12

48.32
47.91
47.18

4.20
3.80
3.06

49.76
49.22
48.28

0.00502 5.88
0.00516 5.55
0.00570 4.99

2.71
2.52
2.20

3.02
2.85
2.56

82.68
70.67
51.11

0.95
0.94
0.95

289
289
289

T=500
T=100
T= 10

389
319
215

42.56
42.56
42.56

47.28
46.76
45.95

4.72
4.20
3.39

47.78
47.23
46.33

0.00130 3.33
0.00139 3.19
0.00144 2.80

1.27
1.11
0.93

1.53
1.46
1.27

140.75
117.47
85.28

0.50
0.50
0.49

288
288
288

T=500
T=100
T= 10

389
319
215

42.39
42.39
42.39

47.29
46.77
45.95

4.89
4.38
3.55

47.64
47.09
46.19

0.00093 2.90
0.00094 2.70
0.00093 2.33

1.46
1.38
1.19

1.55
1.52
1.31

161.76
139.73
106.72

0.42
0.42
0.40

287.5

Bridge

287
287
287

T=500
T=100
T= 10

389
319
215

42.19
42.19
42.19

46.79
46.33
45.47

4.60
4.13
3.28

47.26
46.76
45.87

0.00169 3.70
0.00179 3.53
0.00220 3.33

1.94
1.84
1.63

2.40
2.27
2.11

141.59
120.85
85.58

0.56
0.57
0.60

286
286
286

T=500
T=100
T= 10

389
319
215

41.68
41.68
41.68

45.79
45.40
44.77

4.11
3.72
3.09

46.80
46.29
45.40

0.00320 4.72
0.00319 4.40
0.00287 3.66

2.06
1.86
1.93

1.92
1.77
1.44

97.65
84.51
65.22

0.76
0.74
0.68

285
285
285

T=500
T=100
T= 10

389
319
215

40.63
40.63
40.63

43.79
43.46
42.88

3.16
2.83
2.26

45.19
44.68
43.83

0.00627 5.38
0.00641 5.02
0.00691 4.41

2.83
2.68
2.37

2.00
1.81
1.45

78.05
68.19
51.69

1.01
1.00
1.00

283
283
283

T=500
T=100
T= 10

389
319
215

37.14
37.14
37.14

42.18
41.22
40.40

5.04
4.09
3.26

42.61
41.71
40.78

0.00101 3.08
0.00149 3.23
0.00157 2.83

1.11
1.10
0.87

1.02
1.01
0.84

153.33
115.95
85.84

0.44
0.52
0.51

282

T=500

389

35.85

42.10

6.25

42.48

0.00087 3.23

1.16

1.11

192.93

0.42

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

25

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Perfil
(RS)

Periodo
retorno

Q Total

Min Ch
El

W.S.
Elev

Max
Chl
Dpth

E.G.
Elev

E.G.
Slope

Vel
Chnl

Vel
Left

Vel
Right

Flow
Area

(aos)

(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m/s)

(m/s)

(m2)

Froude
# Chl

282
282

T=100
T= 10

319
215

35.85
35.85

40.96
39.88

5.12
4.03

41.52
40.53

0.00153 3.73
0.00219 3.77

1.17
0.85

1.08
0.91

131.81
77.04

0.54
0.62

281
281
281

T=500
T=100
T= 10

389
319
215

35.76
35.76
35.76

42.28
41.25
40.24

6.51
5.49
4.48

42.37
41.35
40.32

0.00021 1.60
0.00026 1.56
0.00027 1.38

0.60
0.80
0.71

0.56
0.49
0.35

371.06
279.17
206.87

0.21
0.22
0.22

Estudio Hidrulico de los ros Pas y Pisuea. Apndice III

26

Elevation (m)

RS = 100 PA 1
376
374
372
370
368
366
364
362
-150

Legend
WS T=500
Ground
Levee
Bank Sta
-100

-50

50

100

Station (m)

RS = 99 PA 2
230

Legend

Elevation (m)

225

WS T=500

220

Ground

215

Levee

210

Bank Sta

205
-150

-100

-50

50

100

Station (m)

RS = 94 PA 7
210

Legend

Elevation (m)

208
WS T=500

206

Ground

204
202

Levee

200

Bank Sta

198
-200

-150

-100

-50

50

100

150

Station (m)

RS = 93 PA 8
200

Legend

Elevation (m)

198

WS T=500

196

Ground

194

Levee

192
190
-200

Bank Sta
-150

-100

-50
Station (m)

50

RS = 92 PA 9
192

Legend

Elevation (m)

191
WS T=500

190
189

Ground

188

Bank Sta

187
186
-40

-20

20

40

60

80

Station (m)

Elevation (m)

RS = 91 PA 10
192
191
190
189
188
187
186
185
-80

Legend
WS T=500
Ground
Bank Sta

-60

-40

-20

20

40

60

80

Station (m)

RS = 90 PA 11
191

Legend

Elevation (m)

190
WS T=500

189
188

Ground

187

Bank Sta

186
185
-100

-80

-60

-40

-20

20

40

60

80

Station (m)

RS = 89 PA 12
205

Legend

Elevation (m)

200

WS T=500

195

Ground

190

Levee

185
180
-100

Bank Sta
0

100

200

300
Station (m)

400

500

600

RS = 88 PA 13
186

Legend

Elevation (m)

185
WS T=500

184

Ground

183
182

Levee

181

Bank Sta

180
-50

50

100

150

200

250

300

Station (m)

Elevation (m)

RS = 87 PA 14
183
182
181
180
179
178
177
176
-150

Legend
WS T=500
Ground
Levee
Bank Sta
-100

-50

50

100

150

Station (m)

RS = 86 PA 15
186

Legend

Elevation (m)

184
WS T=500

182

Ground

180
178

Levee

176

Bank Sta

174
-200

-150

-100

-50

50

Station (m)

Elevation (m)

RS = 83 PA 18; puente PA05C01


173
172
171
170
169
168
167
166
165
-100

Legend
WS T=500
Ground
Bank Sta

-50

50
Station (m)

100

150

Elevation (m)

RS = 82 PA 19
169
168
167
166
165
164
163
162
-200

Legend
WS T=500
Ground
Levee
Bank Sta
-150

-100

-50

50

100

150

Station (m)

Elevation (m)

RS = 81 PA 20
162
161
160
159
158
157
156
155
-300

Legend
WS T=500
Ground
Levee
Bank Sta
-200

-100

100

200

300

Station (m)

RS = 80 PA 21
150

Legend

Elevation (m)

148

WS T=500

146

Ground

144

Levee

142
140
-300

Bank Sta
-200

-100

100

200

300

400

500

Station (m)

RS = 79 PA 22
136

Legend

Elevation (m)

134

WS T=500

132

Ground

130

Bank Sta

128
126
-100

100

200

300
Station (m)

400

500

600

700

RS = 77.2

BR

120

Legend

Elevation (m)

118

WS T=500

116

Ground

114

Bank Sta

112
110
-100

100

200

300

400

500

Station (m)

RS = 77.2

BR

120

Legend

Elevation (m)

118

WS T=500

116

Ground

114

Bank Sta

112
110
-100

100

200

300

400

500

Station (m)

RS = 77 PA 24
120

Legend

Elevation (m)

118

WS T=500

116

Ground

114

Bank Sta

112
110
-100

100

200

300

400

500

Station (m)

RS = 76 PA 25
116

Legend

Elevation (m)

114
WS T=500

112
110

Ground

108

Levee

106

Bank Sta

104
-400

-300

-200

-100

0
Station (m)

100

200

300

Elevation (m)

RS = 75 PA 26
108
107
106
105
104
103
102
101
-400

Legend
WS T=500
Ground
Levee
Bank Sta
-300

-200

-100

100

200

300

Station (m)

Elevation (m)

RS = 74 PA 27
97
96
95
94
93
92
91
90
-200

Legend
WS T=500
Ground
Levee
Bank Sta
-100

100

200

300

Station (m)

RS = 73 PA 28
87

Legend

Elevation (m)

86
WS T=500

85
84

Ground

83

Bank Sta

82
81
-500

-400

-300

-200

-100

100

Station (m)

RS = 72 PA 29
92

Legend

Elevation (m)

90
WS T=500

88
86

Ground

84

Bank Sta

82
80
-500

-400

-300

-200

-100
Station (m)

100

200

Elevation (m)

RS = 71 PA 30, PA0
92
90
88
86
84
82
80
78
-300

Legend
WS T=500
Ground
Bank Sta

-250

-200

-150

-100

-50

50

100

Station (m)

Elevation (m)

RS = 70.9
92
90
88
86
84
82
80
78
-300

BR
Legend
WS T=500
Ground
Bank Sta

-250

-200

-150

-100

-50

50

100

Station (m)

Elevation (m)

RS = 70.9
92
90
88
86
84
82
80
78
-300

BR
Legend
WS T=500
Ground
Bank Sta

-250

-200

-150

-100

-50

50

100

Station (m)

RS = 70 PA 31
84

Legend

Elevation (m)

83
WS T=500

82
81

Ground

80

Bank Sta

79
78
-200

-150

-100

-50

0
Station (m)

50

100

150

RS = 69 PA 32, azud
82

Legend

Elevation (m)

81

WS T=500

80

Ground

79

Bank Sta

78
77
-80

-60

-40

-20

20

40

60

Station (m)

RS = 68 PA 33
86

Legend

Elevation (m)

84

WS T=500

82

Ground

80

Bank Sta

78
76
-200

-100

100

200

300

Station (m)

Elevation (m)

RS = 67 PA 34
92
90
88
86
84
82
80
78
76
74
-200

Legend
WS T=500
Ground
Bank Sta

-100

100

200

300

400

Station (m)

RS = 66 PA 35
80

Legend

Elevation (m)

79
WS T=500

78
77

Ground

76

Bank Sta

75
74
-60

-40

-20

20
Station (m)

40

60

80

RS = 65 PA 36
80

Legend

Elevation (m)

78

WS T=500

76

Ground

74

Bank Sta

72
70
-100

-80

-60

-40

-20

20

40

60

Station (m)

Elevation (m)

RS = 64 PA 37
82
80
78
76
74
72
70
68
-150

Legend
WS T=500
Ground
Bank Sta

-100

-50

50

100

Station (m)

Elevation (m)

RS = 63 PA 38
82
80
78
76
74
72
70
68
-200

Legend
WS T=500
Ground
Bank Sta

-150

-100

-50

50

100

Station (m)

Elevation (m)

RS = 62 PA 39
73
72
71
70
69
68
67
66
-40

Legend
WS T=500
Ground
Bank Sta

-20

20
Station (m)

40

60

Elevation (m)

RS = 61 PA 40; puente PA08C06


84
82
80
78
76
74
72
70
68
66
64
-100

Legend
WS T=500
Ground
Bank Sta

-50

50

100

150

200

Station (m)

RS = 60.1

BR PAPA08C07 PA41 RS 60

72

Legend

Elevation (m)

70

WS T=500

68

Ground

66

Bank Sta

64
62
-60

-40

-20

20

40

60

80

100

120

Station (m)

RS = 60.1

BR PAPA08C07 PA41 RS 60

72

Legend

Elevation (m)

70

WS T=500

68

Ground

66

Bank Sta

64
62
-60

-40

-20

20

40

60

80

100

120

Station (m)

RS = 60 PA 41;
72

Legend

Elevation (m)

70

WS T=500

68

Ground

66

Bank Sta

64
62
-60

-40

-20

20

40
Station (m)

60

80

100

120

Elevation (m)

RS = 58 PA 43
74
72
70
68
66
64
62
60
58
-200

Legend
WS T=500
Ground
Bank Sta

-150

-100

-50

50

100

Station (m)

RS = 57 PA 44
70

Legend

Elevation (m)

68

WS T=500

66

Ground

64

Bank Sta

62
60
-30

-20

-10

10

20

30

40

50

Station (m)

Elevation (m)

RS = 56 PA 45
70
68
66
64
62
60
58
56
-20

Legend
WS T=500
Ground
Bank Sta

-10

10

20

30

40

50

60

Station (m)

Elevation (m)

RS = 55 PA 46
70
68
66
64
62
60
58
56
54
-100

Legend
WS T=500
Ground
Bank Sta

-80

-60

-40

-20
Station (m)

20

40

RS = 54.1

BR PAPA08C10_PA47

75

Legend

Elevation (m)

70

WS T=500

65

Ground

60

Bank Sta

55
50
-25

-20

-15

-10

-5

10

15

Station (m)

RS = 54.1

BR PAPA08C10_PA47

75

Legend

Elevation (m)

70

WS T=500

65

Ground

60

Bank Sta

55
50
-25

-20

-15

-10

-5

10

15

Station (m)

RS = 54 PA 47
62

Legend

Elevation (m)

60
WS T=500

58
56

Ground

54

Bank Sta

52
50
-25

-20

-15

-10

-5

10

15

Station (m)

Elevation (m)

RS = 53 PA 48
59
58
57
56
55
54
53
52
-40

Legend
WS T=500
Ground
Bank Sta

-30

-20

-10
Station (m)

10

20

Elevation (m)

RS = 52 PA 49
68
66
64
62
60
58
56
54
52
50
-40

Legend
WS T=500
Ground
Bank Sta

-30

-20

-10

10

20

30

Station (m)

Elevation (m)

RS = 51 PA 50
62
60
58
56
54
52
50
48
-80

Legend
WS T=500
Ground
Bank Sta

-60

-40

-20

20

40

Station (m)

Elevation (m)

RS = 50 PA 51
64
62
60
58
56
54
52
50
48
-150

Legend
WS T=500
Ground
Bank Sta

-100

-50

50

100

Station (m)

RS = 49 PA 52
60

Legend

Elevation (m)

58
WS T=500

56
54

Ground

52

Bank Sta

50
48
-80

-60

-40

-20

0
Station (m)

20

40

60

Elevation (m)

RS = 48 PA 53
60
58
56
54
52
50
48
46
-300

Legend
WS T=500
Ground
Bank Sta

-250

-200

-150

-100

-50

50

Station (m)

Elevation (m)

RS = 47 PA 54
49.5
49.0
48.5
48.0
47.5
47.0
46.5
46.0
45.5
45.0
-250

Legend
WS T=500
Ground
Bank Sta

-200

-150

-100

-50

50

100

Station (m)

Elevation (m)

RS = 46 PA 55
56
54
52
50
48
46
44
42
40
-100

Legend
WS T=500
Ground
Bank Sta

-80

-60

-40

-20

20

40

60

Station (m)

RS = 45 PA 56
50

Legend

Elevation (m)

48

WS T=500

46

Ground

44

Bank Sta

42
40
-80

-60

-40

-20

0
Station (m)

20

40

60

80

RS = 44.2

BR PAPA08C12 PA57

RS 44

50

Legend

Elevation (m)

48
WS T=500

46
44

Ground

42

Bank Sta

40
38
-60

-40

-20

20

40

60

Station (m)

RS = 44.2

BR PAPA08C12 PA57

RS 44

50

Legend

Elevation (m)

48
WS T=500

46
44

Ground

42

Bank Sta

40
38
-60

-40

-20

20

40

60

Station (m)

RS = 44 PA 57
50

Legend

Elevation (m)

48
WS T=500

46
44

Ground

42

Bank Sta

40
38
-60

-40

-20

20

40

60

Station (m)

RS = 43 PA 58
48

Legend

Elevation (m)

46
WS T=500

44
42

Ground

40

Bank Sta

38
36
-80

-60

-40

-20

0
Station (m)

20

40

60

RS = 42 PA 59
48

Legend

Elevation (m)

46
WS T=500

44
42

Ground

40

Bank Sta

38
36
-80

-60

-40

-20

20

40

60

Station (m)

RS = 41.6

BR puente PI120 PAPA09C01

48

Legend

Elevation (m)

46
WS T=500

44
42

Ground

40

Bank Sta

38
36
-100

-80

-60

-40

-20

20

40

60

80

Station (m)

RS = 41.6

BR puente PI120 PAPA09C01

48

Legend

Elevation (m)

46
WS T=500

44
42

Ground

40

Bank Sta

38
36
-100

-80

-60

-40

-20

20

40

60

80

Station (m)

RS = 41.5 PI 120; puente


48

Legend

Elevation (m)

46
WS T=500

44
42

Ground

40

Bank Sta

38
36
-100

-80

-60

-40

-20

0
Station (m)

20

40

60

80

RS = 41 PA 60
46

Legend

Elevation (m)

44
WS T=500

42
40

Ground

38

Bank Sta

36
34
-80

-60

-40

-20

20

40

Station (m)

RS = 40 PA 61
42

Legend

Elevation (m)

40

WS T=500

38

Ground

36

Bank Sta

34
32
-40

-20

20

40

60

Station (m)

Elevation (m)

RS = 39 PA 62
46
44
42
40
38
36
34
32
-100

Legend
WS T=500
Ground
Bank Sta

-80

-60

-40

-20

20

40

60

80

Station (m)

RS = 38 PA 63
42

Legend

Elevation (m)

40
WS T=500

38
36

Ground

34

Bank Sta

32
30
-60

-40

-20

0
Station (m)

20

40

60

Elevation (m)

RS = 37.6
44
42
40
38
36
34
32
30
-60

BR puente 64 PAPAC09C03
Legend
WS T=500
Ground
Bank Sta

-40

-20

20

40

60

Station (m)

Elevation (m)

RS = 37.6
44
42
40
38
36
34
32
30
-60

BR puente 64 PAPAC09C03
Legend
WS T=500
Ground
Bank Sta

-40

-20

20

40

60

Station (m)

Elevation (m)

RS = 37 PA 64
44
42
40
38
36
34
32
30
-80

Legend
WS T=500
Ground
Bank Sta

-60

-40

-20

20

40

60

Station (m)

RS = 36 PA 65
42

Legend

Elevation (m)

40

WS T=500

38

Ground

36

Bank Sta

34
32
-40

-20

20

40
Station (m)

60

80

100

Elevation (m)

RS = 35.5

BR PAPA09C05 _ PA65

40

Legend

38

WS T=500
Ground

36

Bank Sta

34
32
-150

-100

-50

50

100

Station (m)

Elevation (m)

RS = 35.5

BR PAPA09C05 _ PA65

40

Legend

38

WS T=500

36

Ground
Bank Sta

34
32
-150

-100

-50

50

100

Station (m)

Elevation (m)

RS = 35 PA 66
40
39
38
37
36
35
34
33
32
-200

Legend
WS T=500
Ground
Bank Sta

-150

-100

-50

50

100

Station (m)

Elevation (m)

RS = 34 PA 67
39
38
37
36
35
34
33
32
-150

Legend
WS T=500
Ground
Levee
Bank Sta
-100

-50

0
Station (m)

50

100

150

RS = 33 PA 68
40

Legend

Elevation (m)

38
WS T=500

36
34

Ground

32

Bank Sta

30
28
-300

-200

-100

100

200

Station (m)

Elevation (m)

RS = 32 PA 69
35
34
33
32
31
30
29
28
27
-50

Legend
WS T=500
Ground
Bank Sta

50

100

150

200

250

Station (m)

RS = 30 PA 71
36

Legend

Elevation (m)

34

WS T=500

32

Ground

30

Bank Sta

28
26
-500

-400

-300

-200

-100

100

Station (m)

RS = 29 PA 72
36

Legend

Elevation (m)

34

WS T=500

32

Ground

30

Bank Sta

28
26
-200

-100

100
Station (m)

200

300

RS = 28 PA 73
32

Legend

Elevation (m)

30

WS T=500

28

Ground

26

Bank Sta

24
22
-400

-200

200

400

600

800

Station (m)

Elevation (m)

RS = 27 PA 74
30
29
28
27
26
25
24
23
22
-200

Legend
WS T=500
Ground
Bank Sta

200

400

600

800

1000

Station (m)

RS = 26 PA 75
30

Legend

Elevation (m)

28

WS T=500

26

Ground

24

Bank Sta

22
20
-400

-200

200

400

600

800

Station (m)

RS = 25 PA 76
30

Legend

Elevation (m)

28
WS T=500

26
24

Ground

22

Bank Sta

20
18
-800

-600

-400

-200

0
Station (m)

200

400

600

800

Elevation (m)

RS = 24 PA 77
36
34
32
30
28
26
24
22
20
18
16
-800

Legend
WS T=500
Ground
Bank Sta

-600

-400

-200

200

400

600

800

Station (m)

RS = 23 PA 78
40

Legend

Elevation (m)

35

WS T=500

30

Ground

25

Bank Sta

20
15
-800

-600

-400

-200

200

400

600

Station (m)

RS = 22 PA 79
28

Legend

Elevation (m)

26

WS T=500

24

Ground

22

Bank Sta

20
18
-150

-100

-50

50

100

Station (m)

RS = 21.9

BR

28

Legend

Elevation (m)

26

WS T=500

24

Ground

22

Bank Sta

20
18
-150

-100

-50

0
Station (m)

50

100

RS = 21.9

BR

28

Legend

Elevation (m)

26

WS T=500

24

Ground

22

Bank Sta

20
18
-150

-100

-50

50

100

Station (m)

RS = 21 PA 80
23

Legend

Elevation (m)

22

WS T=500

21

Ground

20

Bank Sta

19
18
-60

-40

-20

20

40

60

Station (m)

Elevation (m)

RS = 20 PA 81
30
28
26
24
22
20
18
16
14
12
-150

Legend
WS T=500
Ground
Bank Sta

-100

-50

50

100

Station (m)

Elevation (m)

RS = 19.9
30
28
26
24
22
20
18
16
14
12
-150

BR ferrovcaril
Legend
WS T=500
Ground
Bank Sta

-100

-50

0
Station (m)

50

100

Elevation (m)

RS = 19.9
30
28
26
24
22
20
18
16
14
12
-150

BR ferrovcaril
Legend
WS T=500
Ground
Bank Sta

-100

-50

50

100

Station (m)

RS = 19 PA 82
28

Legend

Elevation (m)

26

WS T=500

24

Ground

22

Bank Sta

20
18
-200

-100

100

200

300

Station (m)

RS = 18 PA 83
26

Legend

Elevation (m)

24

WS T=500

22

Ground

20

Bank Sta

18
16
-600

-400

-200

200

400

Station (m)

RS = 17 PA 84
20

Legend

Elevation (m)

19
WS T=500

18
17

Ground

16

Bank Sta

15
14
-300

-200

-100

100

200
Station (m)

300

400

500

600

RS = 16 PA 85
22

Legend

Elevation (m)

20

WS T=500

18

Ground

16

Bank Sta

14
12
-200

200

400

600

800

Station (m)

Elevation (m)

RS = 15 PA 86
26
24
22
20
18
16
14
12
10
-200

Legend
WS T=500
Ground
Bank Sta

200

400

600

800

1000

Station (m)

RS = 14 PA 87
22

Legend

Elevation (m)

20
WS T=500

18
16

Ground

14

Bank Sta

12
10
-100

100

200

300

400

500

600

700

800

Station (m)

RS = 13 PA 88
20

Legend

Elevation (m)

18
WS T=500

16
14

Ground

12

Bank Sta

10
8
-300

-200

-100

100
Station (m)

200

300

400

500

RS = 12 PA 89
16

Legend

Elevation (m)

14

WS T=500

12

Ground

10

Bank Sta

8
6
-50

50

100

150

200

Station (m)

Elevation (m)

RS = 11 PA 90
14
13
12
11
10
9
8
7
6
-100

Legend
WS T=500
Ground
Bank Sta

-50

50

100

150

200

250

Station (m)

RS = 10 PA 91
16

Legend

Elevation (m)

14

WS T=500

12

Ground

10

Bank Sta

8
6
-200

-100

100

200

300

Station (m)

Elevation (m)

RS = 7 PA 94
18
16
14
12
10
8
6
4
-100

Legend
WS T=500
Ground
Bank Sta

100

200

300
Station (m)

400

500

600

RS = 6 PA 95
16

Legend

Elevation (m)

14
WS T=500

12

Ground

10
8

Levee

Bank Sta

4
-100

100

200

300

400

500

Station (m)

RS = 5 PA 96 ;
14

Legend

Elevation (m)

12
WS T=500

10
8

Ground

Bank Sta

4
2
-300

-200

-100

100

200

300

400

Station (m)

RS = 4 PA 97 ;
12

Legend

Elevation (m)

10
WS T=500

8
6

Ground

Bank Sta

2
0
-200

-150

-100

-50

50

100

Station (m)

RS = 3 PA 98
10

Legend

Elevation (m)

WS T=500

Ground

Bank Sta

2
0
-300

-200

-100

0
Station (m)

100

200

Elevation (m)

RS = 2 PA 99
14
12
10
8
6
4
2
0
-300

Legend
WS T=500
Ground
Bank Sta

-250

-200

-150

-100

-50

50

100

Station (m)

Elevation (m)

RS = 1 PA 100
14
12
10
8
6
4
2
0
-2
-400

Legend
WS T=500
Ground
Bank Sta

-300

-200

-100

100

Station (m)

RS = 0 PA 101
10

Legend

Elevation (m)

8
WS T=500

6
4

Ground

Bank Sta

0
-2
-100

-80

-60

-40

-20

0
Station (m)

20

40

60

80

Elevation (m)

RS = 400 PI 1
282
280
278
276
274
272
270
268
266
-30

Legend
WS T=500
Ground
Bank Sta

-20

-10

10

20

30

Station (m)

RS = 399 PI 2; azud PI01C11;ag.abajo-alto 1 m


272

Legend

Elevation (m)

270

WS T=500

268

Ground

266

Bank Sta

264
262
-40

-30

-20

-10

10

20

30

40

Station (m)

Elevation (m)

RS = 398 PI 3
274
272
270
268
266
264
262
260
-50

Legend
WS T=500
Ground
Bank Sta

-40

-30

-20

-10

10

20

30

Station (m)

Elevation (m)

RS = 397 PI 4
274
272
270
268
266
264
262
260
-40

Legend
WS T=500
Ground
Bank Sta

-30

-20

-10
Station (m)

10

20

Elevation (m)

RS = 396.9
274
272
270
268
266
264
262
260
-40

BR PAPI 01C12; PI04


Legend
WS T=500
Ground
Bank Sta

-30

-20

-10

10

20

Station (m)

Elevation (m)

RS = 396.9
274
272
270
268
266
264
262
260
-40

BR PAPI 01C12; PI04


Legend
WS T=500
Ground
Bank Sta

-30

-20

-10

10

20

Station (m)

Elevation (m)

RS = 396 PI 5
275

Legend

270

WS T=500
Ground

265

Bank Sta

260
255
-60

-40

-20

20

40

60

80

100

120

Station (m)

RS = 395 PI 6; puente PI01C13


258

Legend

Elevation (m)

256
WS T=500

254
252

Ground

250

Bank Sta

248
246
-120

-100

-80

-60

-40

-20
Station (m)

20

40

60

80

RS = 394.9

BR PAPI01C013 ; PI06

258

Legend

Elevation (m)

256
WS T=500

254
252

Ground

250

Bank Sta

248
246
-120

-100

-80

-60

-40

-20

20

40

60

80

Station (m)

RS = 394.9

BR PAPI01C013 ; PI06

258

Legend

Elevation (m)

256
WS T=500

254
252

Ground

250

Bank Sta

248
246
-120

-100

-80

-60

-40

-20

20

40

60

80

Station (m)

Elevation (m)

RS = 394 PI 7
258
256
254
252
250
248
246
244
242
-20

Legend
WS T=500
Ground
Bank Sta

-10

10

20

30

40

50

60

Station (m)

RS = 393 PI 8; vado
252

Legend

Elevation (m)

250
WS T=500

248
246

Ground

244

Bank Sta

242
240
-150

-100

-50

0
Station (m)

50

100

150

RS = 392 PI 9
250

Legend

Elevation (m)

248
WS T=500

246
244

Ground

242

Bank Sta

240
238
-50

-40

-30

-20

-10

10

20

Station (m)

Elevation (m)

RS = 391 PI 10; presa PI02C02


246
244
242
240
238
236
234
232
-50

Legend
WS T=500
Ground
Bank Sta

-40

-30

-20

-10

10

20

Station (m)

Elevation (m)

RS = 390.9
246
244
242
240
238
236
234
232
-50

IS
Legend
WS T=500
Ground
Bank Sta

-40

-30

-20

-10

10

20

Station (m)

Elevation (m)

RS = 390.8
246
244
242
240
238
236
234
232
-50

Legend
WS T=500
Ground
Bank Sta

-40

-30

-20

-10
Station (m)

10

20

RS = 390 PI 11
246

Legend

Elevation (m)

244
WS T=500

242
240

Ground

238

Bank Sta

236
234
-60

-50

-40

-30

-20

-10

10

20

Station (m)

Elevation (m)

RS = 389 PI 12, margen izda Ayo Bordaln


250
248
246
244
242
240
238
236
234
-300

Legend
WS T=500
Ground
Bank Sta

-250

-200

-150

-100

-50

50

Station (m)

Elevation (m)

RS = 387 PI 14
250

Legend

245

WS T=500
Ground

240

Bank Sta

235
230
-120

-100

-80

-60

-40

-20

20

40

Station (m)

Elevation (m)

RS = 386 PI 15; presa PI02C04 y azud PI02C03


248
246
244
242
240
238
236
234
232
230
-40

Legend
WS T=500
Ground
Bank Sta

-30

-20

-10
Station (m)

10

20

Elevation (m)

RS = 385.9
248
246
244
242
240
238
236
234
232
230
-40

IS
Legend
WS T=500
Ground
Bank Sta

-30

-20

-10

10

20

Station (m)

Elevation (m)

RS = 385.8
248
246
244
242
240
238
236
234
232
230
-40

Legend
WS T=500
Ground
Bank Sta

-30

-20

-10

10

20

Station (m)

RS = 385 PI 16
242

Legend

Elevation (m)

240
WS T=500

238
236

Ground

234

Bank Sta

232
230
-30

-20

-10

10

20

30

Station (m)

Elevation (m)

RS = 384 PI 17B; ag. arriba del puente PI02C05


242
240
238
236
234
232
230
228
-40

Legend
WS T=500
Ground
Bank Sta

-20

20
Station (m)

40

60

Elevation (m)

RS = 383.9
242
240
238
236
234
232
230
228
-40

BR PI02C05; PI17B
Legend
WS T=500
Ground
Bank Sta

-20

20

40

60

Station (m)

Elevation (m)

RS = 383.9
242
240
238
236
234
232
230
228
-40

BR PI02C05; PI17B
Legend
WS T=500
Ground
Bank Sta

-20

20

40

60

Station (m)

Elevation (m)

RS = 383 PI 18 B; aguas abajo del puente PI02C05 hay azud PI02C06


240
238
236
234
232
230
228
226
224
-40

Legend
WS T=500
Ground
Bank Sta

-20

20

40

60

Station (m)

RS = 382.1

IS

238

Legend

Elevation (m)

236
WS T=500

234
232

Ground

230

Levee

228

Bank Sta

226
-30

-20

-10

10
Station (m)

20

30

40

RS = 382 PI 19; PI02C07 presa de 5 m


238

Legend

Elevation (m)

236
WS T=500

234
232

Ground

230

Bank Sta

228
226
-30

-20

-10

10

20

30

40

Station (m)

Elevation (m)

RS = 381 PI 20
232
231
230
229
228
227
226
225
-100

Legend
WS T=500
Ground
Bank Sta

-50

50

100

150

Station (m)

RS = 380 PI 21; traviesa PI02C08


232

Legend

Elevation (m)

230
WS T=500

228
226

Ground

224

Bank Sta

222
220
-100

-50

50

100

150

200

Station (m)

RS = 379 PI 22 ; traviesa PI02C09


230

Legend

Elevation (m)

228

WS T=500

226

Ground

224

Bank Sta

222
220
-200

-100

100
Station (m)

200

300

Elevation (m)

RS = 378 PI 23
227
226
225
224
223
222
221
220
219
-300

Legend
WS T=500
Ground
Levee
Bank Sta
-200

-100

100

200

300

Station (m)

Elevation (m)

RS = 377 PI 24; aadido 1 p.izda


225
224
223
222
221
220
219
218
217
-200

Legend
WS T=500
Ground
Levee
Bank Sta
-150

-100

-50

50

Station (m)

RS = 376 PI 25
221

Legend

Elevation (m)

220

WS T=500

219

Ground

218

Levee

217
216
-100

Bank Sta
-50

50

100

150

200

Station (m)

Elevation (m)

RS = 375 PI 26
220
219
218
217
216
215
214
213
212
-100

Legend
WS T=500
Ground
Levee
Bank Sta
-50

50
Station (m)

100

150

Elevation (m)

RS = 374 PI 27; puente PI02C10


219
218
217
216
215
214
213
212
211
-150

Legend
WS T=500
Ground
Levee
Bank Sta
-100

-50

50

100

150

Station (m)

Elevation (m)

RS = 373.9
219
218
217
216
215
214
213
212
211
-150

BR PAPI 02C10; PI27


Legend
WS T=500
Ground
Levee
Bank Sta

-100

-50

50

100

150

Station (m)

Elevation (m)

RS = 373.9
219
218
217
216
215
214
213
212
211
-150

BR PAPI 02C10; PI27


Legend
WS T=500
Ground
Levee
Bank Sta

-100

-50

50

100

150

Station (m)

RS = 373 PI 28
220

Legend

Elevation (m)

218
WS T=500

216
214

Ground

212

Bank Sta

210
208
-300

-200

-100

0
Station (m)

100

200

300

RS = 372 PI 29
216

Legend

Elevation (m)

214

WS T=500

212

Ground

210

Bank Sta

208
206
-200

-100

100

200

300

400

Station (m)

Elevation (m)

RS = 371 PI 30; azud PI02C11


214
213
212
211
210
209
208
207
-150

Legend
WS T=500
Ground
Levee
Bank Sta
-100

-50

50

100

Station (m)

Elevation (m)

RS = 370 PI 31
210
209
208
207
206
205
204
203
202
-100

Legend
WS T=500
Ground
Bank Sta

100

200

300

400

Station (m)

RS = 369 PI 32; aadido 1 p. izda


205

Legend

Elevation (m)

204
WS T=500

203
202

Ground

201

Levee

200

Bank Sta

199
-50

50

100
Station (m)

150

200

RS = 368 PI 33
202

Legend

Elevation (m)

201

WS T=500

200

Ground

199

Levee

198
197
-40

Bank Sta
-20

20

40

60

80

100

120

Station (m)

RS = 367 PI 34; ag.arriba del puente PI02C12


202

Legend

Elevation (m)

201
WS T=500

200

Ground

199
198

Levee

197

Bank Sta

196
-60

-40

-20

20

40

60

Station (m)

Elevation (m)

RS = 366.9
204
203
202
201
200
199
198
197
196
-60

BR PAPI 02C12; PI34


Legend
WS T=500
Ground
Levee
Bank Sta

-40

-20

20

40

60

Station (m)

Elevation (m)

RS = 366.9
204
203
202
201
200
199
198
197
196
-60

BR PAPI 02C12; PI34


Legend
WS T=500
Ground
Bank Sta

-40

-20

0
Station (m)

20

40

60

RS = 366 PI 35
200

Legend

Elevation (m)

199
WS T=500

198
197

Ground

196

Bank Sta

195
194
-150

-100

-50

50

100

150

200

Station (m)

RS = 365 PI 36
204

Legend

Elevation (m)

202
WS T=500

200

Ground

198
196

Levee

194

Bank Sta

192
-300

-200

-100

100

200

300

400

Station (m)

Elevation (m)

RS = 364 PI 37
195
194
193
192
191
190
189
188
-300

Legend
WS T=500
Ground
Levee
Bank Sta
-200

-100

100

200

300

400

Station (m)

RS = 363 PI 38
196

Legend

Elevation (m)

194
WS T=500

192
190

Ground

188

Levee

186

Bank Sta

184
-200

-100

100
Station (m)

200

300

RS = 362 PI 39
188

Legend

Elevation (m)

187
WS T=500

186
185

Ground

184

Bank Sta

183
182
-250

-200

-150

-100

-50

50

Station (m)

Elevation (m)

RS = 361 PI 40
187
186
185
184
183
182
181
180
179
-500

Legend
WS T=500
Ground
Bank Sta

-400

-300

-200

-100

100

Station (m)

Elevation (m)

RS = 360 PI 41
184
183
182
181
180
179
178
177
-300

Legend
WS T=500
Ground
Levee
Bank Sta
-200

-100

100

200

Station (m)

RS = 359 PI 42
186

Legend

Elevation (m)

184
WS T=500

182
180

Ground

178

Levee

176

Bank Sta

174
-200

-150

-100

-50

50
Station (m)

100

150

200

250

RS = 358 PI 43
184

Legend

Elevation (m)

182
WS T=500

180
178

Ground

176

Bank Sta

174
172
-200

-100

100

200

300

Station (m)

Elevation (m)

RS = 357.1
178
177
176
175
174
173
172
171
-100

BR PAPI02C13; PI44
Legend
WS T=500
Ground
Levee
Bank Sta

100

200

300

400

Station (m)

Elevation (m)

RS = 357.1
178
177
176
175
174
173
172
171
-100

BR PAPI02C13; PI44
Legend
WS T=500
Ground
Bank Sta

100

200

300

400

Station (m)

Elevation (m)

RS = 357 PI 44; puente PI02C13


178
177
176
175
174
173
172
171
-100

Legend
WS T=500
Ground
Bank Sta

100

200
Station (m)

300

400

RS = 356 PI 45
178

Legend

Elevation (m)

176

WS T=500

174

Ground

172

Levee

170
168
-150

Bank Sta
-100

-50

50

100

150

200

250

Station (m)

RS = 355 PI 46; aadido un p. izda


172

Legend

Elevation (m)

171
WS T=500

170

Ground

169
168

Levee

167

Bank Sta

166
-100

-50

50

100

150

Station (m)

RS = 354 PI47;aa-o 1p.drcha; azud PI47/PI46 (PI02C14 )


176

Legend

Elevation (m)

174
WS T=500

172
170

Ground

168

Bank Sta

166
164
-50

50

100

150

200

250

300

Station (m)

RS = 353 PI 48; aadidos 2p. drcha


176

Legend

Elevation (m)

174
WS T=500

172
170

Ground

168

Bank Sta

166
164
-50

50

100

150
Station (m)

200

250

300

Elevation (m)

RS = 352 PI 49
167
166
165
164
163
162
161
160
-100

Legend
WS T=500
Ground
Bank Sta

100

200

300

400

500

Station (m)

RS = 351 PI 50
164

Legend

Elevation (m)

162

WS T=500

160

Ground

158

Bank Sta

156
154
-100

100

200

300

400

500

600

700

Station (m)

Elevation (m)

RS = 350 PI 51
158
157
156
155
154
153
152
151
-200

Legend
WS T=500
Ground
Bank Sta

-100

100

200

300

400

Station (m)

Elevation (m)

RS = 349 PI 52; aadido 1 p. izda


150
149
148
147
146
145
144
143
142
-400

Legend
WS T=500
Ground
Bank Sta

-300

-200

-100

0
Station (m)

100

200

300

400

RS = 348 PI 53
143

Legend

Elevation (m)

142

WS T=500

141

Ground

140

Bank Sta

139
138
-200

-150

-100

-50

50

100

150

200

Station (m)

Elevation (m)

RS = 347.1
145
144
143
142
141
140
139
138
-150

BR PI02C15; PI54
Legend
WS T=500
Ground
Levee
Bank Sta

-100

-50

50

100

150

Station (m)

Elevation (m)

RS = 347.1
145
144
143
142
141
140
139
138
-150

BR PI02C15; PI54
Legend
WS T=500
Ground
Levee
Bank Sta

-100

-50

50

100

150

Station (m)

Elevation (m)

RS = 347 PI 54; PI02C15 puente


145
144
143
142
141
140
139
138
-150

Legend
WS T=500
Ground
Levee
Bank Sta
-100

-50

0
Station (m)

50

100

150

RS = 346 PI 55
143

Legend

Elevation (m)

142
WS T=500

141

Ground

140
139

Levee

138

Bank Sta

137
-200

-150

-100

-50

50

100

150

200

Station (m)

Elevation (m)

RS = 345 PI 56
139.5
139.0
138.5
138.0
137.5
137.0
136.5
136.0
-250

Legend
WS T=500
Ground
Levee
Bank Sta
-200

-150

-100

-50

50

100

150

Station (m)

RS = 344 PI 57
137

Legend

Elevation (m)

136

WS T=500

135

Ground

134

Bank Sta

133
132
-200

-150

-100

-50

50

100

150

Station (m)

Elevation (m)

RS = 343 PI 58
138
137
136
135
134
133
132
131
130
-40

Legend
WS T=500
Ground
Bank Sta

-20

20

40
Station (m)

60

80

100

120

Elevation (m)

RS = 342 PI 59
135
134
133
132
131
130
129
128
-100

Legend
WS T=500
Ground
Bank Sta

-50

50

100

150

200

Station (m)

Elevation (m)

RS = 341 PI 60; aadido 1 p. drcha


133

Legend

132

WS T=500

131

Ground
Bank Sta

130
129
-100

-80

-60

-40

-20

20

40

60

80

Station (m)

Elevation (m)

RS = 340 PI 61; sobre el puente PI03C03; m.izda hay molino


133
132
131
130
129
128
127
126
-30

Legend
WS T=500
Ground
Bank Sta

-20

-10

10

20

Station (m)

RS = 339 PI 62
134

Legend

Elevation (m)

132
WS T=500

130
128

Ground

126

Bank Sta

124
122
-50

-40

-30

-20

-10
Station (m)

10

20

30

Elevation (m)

RS = 338 PI 63
134
132
130
128
126
124
122
120
-40

Legend
WS T=500
Ground
Bank Sta

-30

-20

-10

10

20

30

Station (m)

RS = 337 PI 64
128

Legend

Elevation (m)

126
WS T=500

124
122

Ground

120

Bank Sta

118
116
-60

-40

-20

20

40

Station (m)

Elevation (m)

RS = 336 PI 65 azud PI03C04, 5m


128
126
124
122
120
118
116
114
112
-40

Legend
WS T=500
Ground
Bank Sta

-30

-20

-10

10

20

30

Station (m)

RS = 335 PI 66
130

Legend

Elevation (m)

128
WS T=500

126
124

Ground

122

Bank Sta

120
118
-50

-40

-30

-20

-10
Station (m)

10

20

30

Elevation (m)

RS = 334.1
130
128
126
124
122
120
118
116
-50

BR PI03C05; PI67
Legend
WS T=500
Ground
Bank Sta

-40

-30

-20

-10

10

20

30

Station (m)

Elevation (m)

RS = 334.1
130
128
126
124
122
120
118
116
-50

BR PI03C05; PI67
Legend
WS T=500
Ground
Bank Sta

-40

-30

-20

-10

10

20

30

Station (m)

Elevation (m)

RS = 334 PI 67; puente antiguo PI03C05


130
128
126
124
122
120
118
116
-50

Legend
WS T=500
Ground
Bank Sta

-40

-30

-20

-10

10

20

30

Station (m)

Elevation (m)

RS = 333 PI 68 ; puente PI03C06


136
134
132
130
128
126
124
122
120
118
-50

Legend
WS T=500
Ground
Bank Sta

-40

-30

-20

-10
Station (m)

10

20

30

Elevation (m)

RS = 332.9
136
134
132
130
128
126
124
122
120
118
-50

BR
Legend
WS T=500
Ground
Bank Sta

-40

-30

-20

-10

10

20

30

Station (m)

Elevation (m)

RS = 332.9
136
134
132
130
128
126
124
122
120
118
-50

BR
Legend
WS T=500
Ground
Bank Sta

-40

-30

-20

-10

10

20

30

Station (m)

Elevation (m)

RS = 332 PI 69
122
120
118
116
114
112
110
108
106
-60

Legend
WS T=500
Ground
Bank Sta

-40

-20

20

40

Station (m)

Elevation (m)

RS = 331 PI 70
126
124
122
120
118
116
114
112
110
108
106
-300

Legend
WS T=500
Ground
Bank Sta

-200

-100

0
Station (m)

100

200

300

Elevation (m)

RS = 330 PI 71
111
110
109
108
107
106
105
104
103
-150

Legend
WS T=500
Ground
Levee
Bank Sta
-100

-50

50

100

Station (m)

Elevation (m)

RS = 329 PI 72; puente PI03C08


110
109
108
107
106
105
104
103
102
-150

Legend
WS T=500
Ground
Bank Sta

-100

-50

50

100

150

200

Station (m)

Elevation (m)

RS = 328.9
110
109
108
107
106
105
104
103
102
-150

BR PI03C08; PI72
Legend
WS T=500
Ground
Bank Sta

-100

-50

50

100

150

200

Station (m)

Elevation (m)

RS = 328.9
110
109
108
107
106
105
104
103
102
-150

BR PI03C08; PI72
Legend
WS T=500
Ground
Bank Sta

-100

-50

50
Station (m)

100

150

200

Elevation (m)

RS = 328 PI 73; no tiene cero marcado en los datos


106
105
104
103
102
101
100
99
98
-350

Legend
WS T=500
Ground
Bank Sta

-300

-250

-200

-150

-100

-50

50

Station (m)

Elevation (m)

RS = 327 PI 74; entre 327-326 hay azud PI03C09


105
104
103
102
101
100
99
98
-200

Legend
WS T=500
Ground
Bank Sta

-150

-100

-50

50

100

150

Station (m)

Elevation (m)

RS = 326 PI 75
105
104
103
102
101
100
99
98
-80

Legend
WS T=500
Ground
Bank Sta

-60

-40

-20

20

40

60

80

Station (m)

RS = 325 PI 76
104

Legend

Elevation (m)

102

WS T=500

100

Ground

98

Bank Sta

96
94
-40

-20

20

40
Station (m)

60

80

100

120

Elevation (m)

RS = 324 PI 77
103
102
101
100
99
98
97
96
-60

Legend
WS T=500
Ground
Bank Sta

-40

-20

20

40

60

Station (m)

Elevation (m)

RS = 323 PI 78
102
101
100
99
98
97
96
95
94
93
-150

Legend
WS T=500
Ground
Bank Sta

-100

-50

50

100

Station (m)

Elevation (m)

RS = 322 PI 79; aadido 1 p drcha


106
104
102
100
98
96
94
92
-100

Legend
WS T=500
Ground
Bank Sta

-50

50

100

150

200

250

Station (m)

Elevation (m)

RS = 321 PI 80 ; azud de 1m, entre este p. y 320


98
97
96
95
94
93
92
91
-150

Legend
WS T=500
Ground
Bank Sta

-100

-50

50
Station (m)

100

150

200

Elevation (m)

RS = 320 PI 81
95.0
94.5
94.0
93.5
93.0
92.5
92.0
91.5
91.0
-60

Legend
WS T=500
Ground
Bank Sta

-40

-20

20

40

60

80

Station (m)

Elevation (m)

RS = 319 PI 82 ; margen izda Sta Maria de Cayon


98
97
96
95
94
93
92
91
90
-200

Legend
WS T=500
Ground
Levee
Bank Sta
-150

-100

-50

50

100

150

Station (m)

RS = 318 PI 83; puente PI04C01


98

Legend

Elevation (m)

96

WS T=500

94

Ground

92

Bank Sta

90
88
-100

-50

50

100

150

200

Station (m)

RS = 317.9

BR papi04c01; pi083

98

Legend

Elevation (m)

96

WS T=500

94

Ground

92

Bank Sta

90
88
-100

-50

50
Station (m)

100

150

200

RS = 317.9

BR papi04c01; pi083

98

Legend

Elevation (m)

96

WS T=500

94

Ground

92

Bank Sta

90
88
-100

-50

50

100

150

200

Station (m)

RS = 317 PI 84
94

Legend

Elevation (m)

93
WS T=500

92
91

Ground

90

Bank Sta

89
88
-60

-40

-20

20

40

60

Station (m)

RS = 316 PI 85
94

Legend

Elevation (m)

92

WS T=500

90

Ground

88

Bank Sta

86
84
-200

-100

100

200

300

Station (m)

RS = 315 PI 86
85

Legend

Elevation (m)

84
WS T=500

83
82

Ground

81

Levee

80

Bank Sta

79
-300

-200

-100

0
Station (m)

100

200

300

Elevation (m)

RS = 314 PI 87;.puente PI04C02


86
85
84
83
82
81
80
79
78
-60

Legend
WS T=500
Ground
Bank Sta

-40

-20

20

40

60

Station (m)

Elevation (m)

RS = 313.9
87
86
85
84
83
82
81
80
79
78
-60

BR PI04C02; PI87
Legend
WS T=500
Ground
Bank Sta

-40

-20

20

40

60

Station (m)

Elevation (m)

RS = 313.9
87
86
85
84
83
82
81
80
79
78
-60

BR PI04C02; PI87
Legend
WS T=500
Ground
Bank Sta

-40

-20

20

40

60

Station (m)

Elevation (m)

RS = 313 PI 88; izda N623


85
84
83
82
81
80
79
78
77
-150

Legend
WS T=500
Ground
Bank Sta

-100

-50
Station (m)

50

RS = 312 PI 89; azud PI05C01


83

Legend

Elevation (m)

82

WS T=500

81

Ground

80

Bank Sta

79
78
-150

-100

-50

50

100

Station (m)

RS = 311 PI 90
81

Legend

Elevation (m)

80
WS T=500

79

Ground

78
77

Levee

76

Bank Sta

75
-80

-60

-40

-20

20

40

60

Station (m)

RS = 310 PI 91;
86

Legend

Elevation (m)

84
WS T=500

82

Ground

80
78

Levee

76

Bank Sta

74
-300

-250

-200

-150

-100

-50

50

100

150

Station (m)

RS = 309 PI 92
84

Legend

Elevation (m)

82

WS T=500

80

Ground

78

Bank Sta

76
74
-250

-200

-150

-100

-50
Station (m)

50

100

150

Elevation (m)

RS = 308.1
81
80
79
78
77
76
75
74
-250

BR papi05c02 ;PI93
Legend
WS T=500
Ground
Levee
Bank Sta

-200

-150

-100

-50

50

100

Station (m)

Elevation (m)

RS = 308.1
81
80
79
78
77
76
75
74
-250

BR papi05c02 ;PI93
Legend
WS T=500
Ground
Levee
Bank Sta

-200

-150

-100

-50

50

100

Station (m)

Elevation (m)

RS = 308 PI 93; puente PI05C02


81
80
79
78
77
76
75
74
-250

Legend
WS T=500
Ground
Levee
Bank Sta
-200

-150

-100

-50

50

100

Station (m)

Elevation (m)

RS = 307 PI 94
80
79
78
77
76
75
74
73
72
-200

Legend
WS T=500
Ground
Bank Sta

-150

-100

-50
Station (m)

50

Elevation (m)

RS = 306.1
79
78
77
76
75
74
73
72
71
-400

BR
Legend
WS T=500
Ground
Levee
Bank Sta

-200

200

400

600

Station (m)

Elevation (m)

RS = 306.1
79
78
77
76
75
74
73
72
71
-400

BR
Legend
WS T=500
Ground
Levee
Bank Sta

-200

200

400

600

Station (m)

RS = 306 PI 95; puente PI05C03


77

Legend

Elevation (m)

76
WS T=500

75

Ground

74
73

Levee

72

Bank Sta

71
-400

-200

200

400

600

Station (m)

RS = 305 PI 96
80

Legend

Elevation (m)

78
WS T=500

76
74

Ground

72

Levee

70

Bank Sta

68
-300

-200

-100

0
Station (m)

100

200

Elevation (m)

RS = 304 PI 97; aadido 1 p.izda


77
76
75
74
73
72
71
70
69
-400

Legend
WS T=500
Ground
Levee
Bank Sta
-300

-200

-100

100

Station (m)

Elevation (m)

RS = 303 PI 98
73
72
71
70
69
68
67
66
-300

Legend
WS T=500
Ground
Levee
Bank Sta
-200

-100

100

200

Station (m)

Elevation (m)

RS = 302 PI 99
70
69
68
67
66
65
64
63
-200

Legend
WS T=500
Ground
Bank Sta

-100

100

200

300

400

500

Station (m)

Elevation (m)

RS = 301 PI 100; azud 0.5m PI05C05


70
69
68
67
66
65
64
63
62
61
-600

Legend
WS T=500
Ground
Levee
Bank Sta
-400

-200

0
Station (m)

200

400

600

RS = 300 PI 101, a 6 m ag.arriba hay perfil con azud


64.0

Legend

Elevation (m)

63.5
WS T=500

63.0
62.5

Ground

62.0

Bank Sta

61.5
61.0
-60

-40

-20

20

40

60

80

Station (m)

RS = 299 PI 102
68

Legend

Elevation (m)

66

WS T=500

64

Ground

62

Bank Sta

60
58
-250

-200

-150

-100

-50

50

100

150

Station (m)

RS = 298 PI 103
60

Legend

Elevation (m)

59

WS T=500

58

Ground

57

Bank Sta

56
55
-250

-200

-150

-100

-50

50

100

150

Station (m)

RS = 297 PI104 -esta tomado en el campo en direccion dcha -izda. Aqui la


60

Legend

Elevation (m)

59

WS T=500

58

Ground

57

Bank Sta

56
55
-60

-40

-20

0
Station (m)

20

40

60

Elevation (m)

RS = 296.5 PI 1051; 70m ag.abajo-Suministro ag.Santander


61
60
59
58
57
56
55
54
53
-200

Legend
WS T=500
Ground
Levee
Bank Sta
-100

100

200

300

Station (m)

Elevation (m)

RS = 296.2 igual a PI 105; puente PI05C06


60
59
58
57
56
55
54
53
52
-100

Legend
WS T=500
Ground
Bank Sta

100

200

300

400

500

600

Station (m)

Elevation (m)

RS = 296.1
60
59
58
57
56
55
54
53
52
-100

BR
Legend
WS T=500
Ground
Bank Sta

100

200

300

400

500

600

Station (m)

Elevation (m)

RS = 296.1
60
59
58
57
56
55
54
53
52
-100

BR
Legend
WS T=500
Ground
Bank Sta

100

200

300
Station (m)

400

500

600

Elevation (m)

RS = 296 PI 105; puente PI05C06


60
59
58
57
56
55
54
53
52
-100

Legend
WS T=500
Ground
Bank Sta

100

200

300

400

500

600

Station (m)

RS = 295 PI 106
60

Legend

Elevation (m)

58

WS T=500

56

Ground

54

Bank Sta

52
50
-400

-200

200

400

600

Station (m)

Elevation (m)

RS = 294 PI 107
62
60
58
56
54
52
50
48
-100

Legend
WS T=500
Ground
Bank Sta

100

200

300

400

500

600

Station (m)

RS = 293 PI 108
56

Legend

Elevation (m)

54

WS T=500

52

Ground

50

Bank Sta

48
46
-250

-200

-150

-100

-50
Station (m)

50

100

RS = 292 PI 109
56

Legend

Elevation (m)

54

WS T=500

52

Ground

50

Bank Sta

48
46
-200

-150

-100

-50

50

100

150

200

Station (m)

RS = 291.1

BR PI05C07; PI 110

56

Legend

Elevation (m)

54
WS T=500

52
50

Ground

48

Bank Sta

46
44
-150

-100

-50

50

100

150

Station (m)

RS = 291.1

BR PI05C07; PI 110

56

Legend

Elevation (m)

54
WS T=500

52
50

Ground

48

Bank Sta

46
44
-150

-100

-50

50

100

150

Station (m)

RS = 291 PI 110 ; puente PI05C07


56

Legend

Elevation (m)

54
WS T=500

52
50

Ground

48

Bank Sta

46
44
-150

-100

-50

0
Station (m)

50

100

150

RS = 290 PI 111
56

Legend

Elevation (m)

54
WS T=500

52
50

Ground

48

Bank Sta

46
44
-150

-100

-50

50

100

150

200

Station (m)

RS = 289 PI 112
52

Legend

Elevation (m)

50

WS T=500

48

Ground

46

Bank Sta

44
42
-100

-80

-60

-40

-20

20

40

60

Station (m)

RS = 288 PI 113 ; puente PI05C08 y C09, p.ag arriba


52

Legend

Elevation (m)

50

WS T=500

48

Ground

46

Bank Sta

44
42
-60

-40

-20

20

40

60

Station (m)

RS = 287.5

BR PI05C08; PI113 y ag. abajo el pilar de PI05C09

52

Legend

Elevation (m)

50

WS T=500

48

Ground

46

Bank Sta

44
42
-60

-40

-20

0
Station (m)

20

40

60

RS = 287.5

BR PI05C08; PI113 y ag. abajo el pilar de PI05C09

52

Legend

Elevation (m)

50

WS T=500

48

Ground

46

Bank Sta

44
42
-60

-40

-20

20

40

60

Station (m)

RS = 287 PI 114 ; puente PI05C08 y C09, p.ag abajo


52

Legend

Elevation (m)

50

WS T=500

48

Ground

46

Bank Sta

44
42
-60

-40

-20

20

40

60

Station (m)

Elevation (m)

RS = 286 PI 115
54
52
50
48
46
44
42
40
-40

Legend
WS T=500
Ground
Bank Sta

-30

-20

-10

10

20

30

40

Station (m)

RS = 285 PI 116
50

Legend

Elevation (m)

48

WS T=500

46

Ground

44

Bank Sta

42
40
-60

-40

-20

0
Station (m)

20

40

60

Elevation (m)

RS = 283 PI 118
50
48
46
44
42
40
38
36
-60

Legend
WS T=500
Ground
Bank Sta

-40

-20

20

40

Station (m)

RS = 282 PI 119
46

Legend

Elevation (m)

44
WS T=500

42
40

Ground

38

Bank Sta

36
34
-40

-20

20

40

60

Station (m)

RS = 281 PI 121
46

Legend

Elevation (m)

44
WS T=500

42
40

Ground

38

Bank Sta

36
34
-100

-80

-60

-40

-20

0
Station (m)

20

40

60

80

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

APNDICE 4:
DESCRIPCIN DE ESTRUCTURAS SINGULARES

Estudio Hidrulico de los ros Pas y Pisuea. Apndice 4

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

Estudio Hidrulico. Apndice 4

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS:

NOMBRE: Puente Romnico (s.XVI)

CODIGO: PAPA09C10

LOCALIZACION: T.M. de PILAGOS

PLANO N

COORDENADAS :
X=423396.09 ; Y=4806221.72

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: AZUD

PERFIL HEC-RAS:

NOMBRE:

CODIGO: PAPA09C09

LOCALIZACION: T.M. de PILAGOS

PLANO N

COORDENADAS :
X=421968.34 ; Y=4804610.84

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 19.9

NOMBRE: puente del FFCC a Madrid

CODIGO: PAPA09C07

LOCALIZACION: T.M. de PILAGOS

PLANO N

COORDENADAS :
X=422292.959 ; Y=4801303.489

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 21.9

NOMBRE:

CODIGO: PAPA09C06

PLANO N

LOCALIZACION: T.M. de PILAGOS. CA-

COORDENADAS :

234, que une Renedo de Pilagos y Zurita

X=422108.031 ; Y=4801041.08

DIAGNOSTICO HIDRAULICO:
El puente no tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 35.5

NOMBRE:

CODIGO: PAPA09C05

LOCALIZACION: T.M. de PILAGOS y de


T.M. de PUENTE VIESGO. N-623

PLANO N

COORDENADAS :
X=421268.35 ; Y=4798507.06

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 37.6

NOMBRE: puente de Caranda

CODIGO: PAPA09C03

LOCALIZACION: T.M. de PILAGOS y de


T.M. de PUENTE VIESGO.

PLANO N

COORDENADAS :
X=421435.93 ; Y=4798487.75

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 41.6

NOMBRE:

CODIGO: PAPA09C01

LOCALIZACION: N-634. Ncleo urbano Vargas


en T.M. de PILAGOS y T.M de CASTAEDA

PLANO N

COORDENADAS :
X=422557.08 ; Y=4797431.65

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 44.2

NOMBRE:

CODIGO: PAPA08C12

LOCALIZACION: Antigua N-634. T.M. de


PILAGOS y T.M. de CASTAEDA

PLANO N

COORDENADAS :
X=422435.247 ; Y=4796966.812

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 54.1

NOMBRE: puente del Balneario

CODIGO: PAPA08C10

LOCALIZACION: T.M. de PUENTE VIESGO

PLANO N

COORDENADAS :
X=421722.449 ; Y=4794646.85

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: AZUD

PERFIL HEC-RAS: RS 57

NOMBRE:

CODIGO: PAPA08C09

PLANO N

LOCALIZACION: T.M. de PUENTE VIESGO

COORDENADAS :
X=422072.117 ; Y= 4794312.716

DIAGNOSTICO HIDRAULICO:

10

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 60.1

NOMBRE:

CODIGO: PAPA08C07

PLANO N

LOCALIZACION: T.M. de PUENTE VIESGO

COORDENADAS :
X=422253.124 ; Y=4793944.786

DIAGNOSTICO HIDRAULICO:
El puente no tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

11

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 61

NOMBRE:

CODIGO: PAPA08C06

PLANO N

LOCALIZACION: T.M. de PUENTE VIESGO

COORDENADAS :
X=422365.247 ; Y=4793657.549

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

12

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: AZUD

PERFIL HEC-RAS: RS 69

NOMBRE:

CODIGO: PAPA08C03

LOCALIZACION: T.M. de PUENTE VIESGO y


T.M. de SANTIURDE DE TORANZO

PLANO N

COORDENADAS :
X=423403.776 ; Y=4792493.895

DIAGNOSTICO HIDRAULICO:

13

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 70.9

NOMBRE:

CODIGO: PAPA08C01

LOCALIZACION: T.M. SANTIURDE DE


TORANZO y T.M. de CORVERA DE TORANZO

PLANO N

COORDENADAS :
X=423484.416 ; Y=4792263.364

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

14

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 77.2

NOMBRE: puente de la Unin Deseada

CODIGO: PAPA07C01

LOCALIZACION: T.M. SANTIURDE DE


TORANZO y T.M. de CORVERA DE TORANZO

PLANO N

COORDENADAS :
X=423261.788 ; Y=4788290.347

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

15

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

NOMBRE: El puente alto, nuevo trazado de N-634

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS:

CODIGO: PAPI05C09

LOCALIZACION: T.M. de CASTAEDA

PLANO N

COORDENADAS :
X=423341.205 ; Y= 4796288.707

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 287.5

NOMBRE: El puente bajo sobre la antigua N-634

CODIGO: PAPI05C08

LOCALIZACION: T.M. de CASTAEDA

PLANO N

COORDENADAS :
X=423338.555 ; Y=4796280.901

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 291.1

NOMBRE:

CODIGO: PAPI05C07

LOCALIZACION: T.M. de CASTAEDA

PLANO N

COORDENADAS :
X=423751.859 ; Y=4795942.761

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 296.1

NOMBRE: Hacia ncleo urbano Pomaluengo

CODIGO: PAPI05C06

LOCALIZACION: T.M. de CASTAEDA;


CA-610

PLANO N

COORDENADAS :
X=424792.821 ; Y=4795345.503

DIAGNOSTICO HIDRAULICO:
El puente no tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 306.1

NOMBRE:

CODIGO: PAPI05C03

LOCALIZACION: T.M. de SANTA MARA DE


CAYN; N-623

PLANO N

COORDENADAS :
X=428338.266 ; Y=4796102.778

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 308.1

NOMBRE: La Penilla

CODIGO: PAPI05C02

LOCALIZACION: T.M. de SANTA MARA DE


CAYN

PLANO N

COORDENADAS :
X=428774.353 ; Y=4796364.885

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: AZUD

PERFIL HEC-RAS: RS 312

NOMBRE:

CODIGO: PAPI05C01

LOCALIZACION: T.M. de SANTA MARA DE


CAYN

PLANO N

COORDENADAS :
X=429089.876 ; Y=4796645.289

DIAGNOSTICO HIDRAULICO:

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 313.9

NOMBRE:

CODIGO: PAPI04C02

LOCALIZACION: T.M. de SANTA MARA DE


CAYN, N-623

PLANO N

COORDENADAS :
X=429461.023 ; Y=4796672.650

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 317.9

NOMBRE: Puente Santa Mara de Cayn

CODIGO: PAPI04C01

LOCALIZACION: T.M. de SANTA MARA DE


CAYN; CA-618 y CA-610

PLANO N

COORDENADAS :
X=430729.093 ; Y=4795630.744

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 328.9

NOMBRE: Puente peatonal

CODIGO: PAPI03C08

LOCALIZACION: T.M. de SANTA MARA DE


CAYN

PLANO N

COORDENADAS :
X=431563.531 ; Y=4794045.539

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos

10

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

NOMBRE: Puente del nuevo trazado de la

carretera hacia Santa Mara de Cayn


PERFIL HEC-RAS: RS 332.9

CODIGO: PAPI03C06

LOCALIZACION: T.M. de SANTA MARA DE


CAYN; CA-143

PLANO N

COORDENADAS :
X=431978.803 ; Y=4792939.298

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

11

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 334.1

NOMBRE: Puente del Diablo

CODIGO: PAPI03C05

LOCALIZACION: T.M. de SANTA MARA DE


CAYN

PLANO N

COORDENADAS :
X=432005.229 ; Y=4792924.106

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

12

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: AZUD

PERFIL HEC-RAS: RS 337

NOMBRE:

CODIGO: PAPI03C04

LOCALIZACION: T.M. de VILLAFUFRE y


T.M. de SARO

PLANO N

COORDENADAS :
X=432000.234 ; Y=4792584.994

DIAGNOSTICO HIDRAULICO:

13

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS340

NOMBRE:

CODIGO: PAPI03C03

LOCALIZACION: T.M. de VILLAFUFRE y


T.M. de SARO

PLANO N

COORDENADAS :
X=431240.420 ; Y=4791208.005

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

14

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: AZUD

PERFIL HEC-RAS: RS 341

NOMBRE:

CODIGO: PAPI03C01

LOCALIZACION: T.M. de VILLAFUFRE y


T.M. de SARO

PLANO N

COORDENADAS :
X=431227.097 ; Y=4790996.619

DIAGNOSTICO HIDRAULICO:

15

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

NOMBRE: La carretera que une los ncleos de


Vega y Saro

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 347.1

CODIGO: PAPI02C15

LOCALIZACION: T.M. de VILLAFUFRE y


T.M. de SARO

PLANO N

COORDENADAS :
X=431402.902 ; Y=4790052.992

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos

16

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 357.1

NOMBRE: Puente de Brcena de Carriedo

CODIGO: PAPI02C13

LOCALIZACION: T.M. de VILLACARRIEDO

PLANO N

COORDENADAS :
X=433137.495 ; Y=4788005.787

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

17

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 366.9

NOMBRE: Puente de Villacarriedo

CODIGO: PAPI02C12

LOCALIZACION: T.M. de VILLACARRIEDO;


CA- 142

PLANO N

COORDENADAS :
X=434125.227 ; Y=4787287.784

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos

18

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 373.9

NOMBRE: Carretera Vecinal de Tezanos a Selaya.

CODIGO: PAPI02C10

LOCALIZACION: T.M. de SELAYA y T.M. de


VILLACARRIEDO

PLANO N

COORDENADAS :
X=434232.292 ; Y=4785628.962

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

19

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PRESA

NOMBRE:

PERFIL HEC-RAS: RS 382.1

CODIGO: PAPI02C07

LOCALIZACION: T.M.de SELAYA

PLANO N

COORDENADAS :
X=434534.053 ; Y=4784631.235

DIAGNOSTICO HIDRAULICO:

20

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 383.9

NOMBRE: Barrio San Esteban

CODIGO: PAPI02C05

LOCALIZACION: T.M. de SELAYA; CA-262

PLANO N

COORDENADAS :
X=434647.851 ; Y=4784738.791

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

21

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PRESA y AZUD

NOMBRE:

CODIGO: PAPI02C04
PAPI02C03

PERFIL HEC-RAS: RS 385.9

LOCALIZACION: T.M. de SELAYA

PLANO N

COORDENADAS :
X=434752.458 ; Y=4784546.660

DIAGNOSTICO HIDRAULICO:

22

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PRESA

NOMBRE:

PERFIL HEC-RAS: RS 390.9

CODIGO: PAPI02C02

LOCALIZACION: T.M. de SELAYA

PLANO N

COORDENADAS :
X=434785.484 ; Y=4784389.078

DIAGNOSTICO HIDRAULICO:

23

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 394.9

NOMBRE: Barrio de Herreria

CODIGO: PAPI01C13

LOCALIZACION: T.M. de SELAYA; N-624

PLANO N

COORDENADAS :
X=434864.679 ; Y=4783756.041

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

24

ESTUDIO INTEGRAL DE LA CUENCA DEL RIO PAS

TIPO ESTRUCTURA: PUENTE

PERFIL HEC-RAS: RS 396.9

NOMBRE:

CODIGO: PAPI01C12

LOCALIZACION: T.M. de SELAYA

PLANO N

COORDENADAS :
X=435071.041 ; Y=4783332.693

DIAGNOSTICO HIDRAULICO:
El puente tiene la capacidad hidrulica suficiente para desaguar el caudal estimado de
T=500 aos.

25

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

APNDICE 5:
RESULTADOS CON CAUDALES DE LA CONFEDERACIN
HIDROGRFICA DEL NORTE

ESTUDIO INTEGRAL DE LA CUENCA DEL RO PAS

INTRODUCCIN Y DESCRIPCIN

En este apndice se muestran los resultados de inundabilidad obtenidos con los caudales
de la CHN mediante el baco de diseo figura G3.1: Caudales especficos de avenidas
en funcin de la cuenca afluente y del periodo de retorno T, contenida en el documento
Proyecto de Directrices del Plan Hidrolgico Norte II y descrito en detalle en el
Anejo II.
Dichos resultados se presentan de forma grfica en los planos dispuestos al final del
Documento de planos, nombrados como Lnea de inundacin T= 500 aos. Caudales
de la CHN.

Estudio Hidrulico de los ros Pas y Pisuea. Apndice 5