FACULTAD DE INGENIERIA
DEPARTAMENTO DE MINAS
ING. DE EJEC. EN MINAS
TRANSPORTE
2.21
= 1.30 METROS CUBICOS 1.70 YARDAS CUBICAS
2.67 * 0.635
1.75 TON / M3
0.82
HUMEDAD
T. CICLO CAMION:
40 MIN
T. CICLO REAL PALA:
40 SEG
TIEMPO OPERACIONAL/ TURNO:
6.30 HRS
TIEMPO EQ EN RESERVA/TURNO:
0.70 HRS
FACTOR OPERACIONAL
80%
SE PIDE 1- IOps Y FACTOR DE UTILIZACION DE TIEMPO
2- PRODUCCION HORARIA REQUERIDA
3- EN CUANTO TIEMPO SE LLENA EL CAMION
4- RENDIMIENTO HORARIO DE LOS EQUIPOS
5- FACTOR DE EQUILIBRIO Y SIGNIFICADO DEL VALOR OBTENIDO
6- COMO OPTIMIZARIA LA OPERACIN
DESARROLLO:
1- DF=(HR OP + HR RES)/HR PROG = ( 6.30 + 0.70 ) / 8 = 0.875
LOS EQUIPOS ESTAN DISPONIBLES EL 87.5 % DEL TIEMPO PROGRAMADO
U=HR OP/(HR OP + HR RES)= 6.30/( 6.30+0.70 )= 0.90
LOS EQUIPOS SE UTILIZAN EL 90 % DEL TIEMPO DISPONIBLE
FO=HR EF/ HR OP HR EF=FO*HR OP=0.80*6.30=5.04 HRS
KU=HR EF/HR PROG=5.04/8=0.63
LOS EQUIPOS SE UTILIZAN EL 63% DEL TIEMPO PROGRAMADO
2- PRODUCCION HORARIA=8800/5.04=1746 TON / HR EF
ASUMA:
TIEMPO DE CARGA DESCARGA
FACTOR DE EXCAVACION
TIEMPO DE CICLO DEL CARGADOR
FACTOR DE LLENADO DEL CARGADOR
DENSIDAD APARENTE
55 SEGUNDOS
1.3
40 SEGUNDOS
0.90
1.75 TON POR METRO CUBICO
DESARROLLO
1- VOLUMEN TOLVA= 24/1.75=13.714
VOLUMEN PALA= 4 YD3 * 0.7646*0.90=2.752 METROS CUBICOS
TCRP:TIEMPO DE CICLO REAL PALA=40*1.3=52/60=0.866 MINUTOS
TFP:TIEMPO FIJO PALA= 55/60=0.9167MINUTOS
TV=(X/35KM/HR)+
(X/40KM/HR)=(75/1400)X=0.05357HR/KM=0.0032METROS/MINUTOS
TF+TV=VT/VP *TCRP (n-1) COMO n=3
0.9167+0.0032X=5*0.866*2
X=2423 METROS
POR LO TANTO (0.9167+0.0032*2423)/2=4.335 MINUTOS
2- 2 CAMIONES * 4.335 MINUTOS= 8.67 MINUTOS
TIEMPO DE RECORRIDO COMPLETO
2423/583.33
30 MIN
25 MIN
40 MIN
140 HORAS
MANTENIMIENTO/MES
72 HORAS
SE PIDE:
1- RENDIMIENTO EFECTIVO
2- IOps SEGN ASARCO : COMENTE VALORES
3- FACTOR DE UTILIZACION REAL
DESARROLLO:
HR PROG=TCR-DEMORAS FIJAS=21.25 * 25 DIAS = 531.25 HR/ MES
DONDE TCR = TIEMPO CRONOLOGICO
HR OP=HR PROG -( HR RES + HR MANT)=531.25-212= 319.95 HR OP
HR EF=HR OP- DEMORAS OPERACIONALES=269.25 HR EF
RENDIMIENTO = 42413 = 157.52 TON/HR
269.25
DF:DISPONIBILIDAD FISICA= (319.25 + 140)/531.25= 86.44
U=319.25/(319.25+140)=69.51
DF-U= 16.93 TIEMPO QUE SE PIERDE
DM: DISPONIBIDAD MECANICA=319.25/(319.25+72)=81.59
KU= 269.25/531.25=50.68%
SE PIDE:
1- RRENDIMIENTO HORARIO POR TURNO
2- PARA QUE NOS SIRVE EL FACTOR DE EXCAVACION
DESARROLLO:
QHP=CP*NC*S-1 *A*O*BF*P*DESP.
CP=4.5876 METROS CUBICOS
NC=3600/40=90
S-1=1/1,1
A=(8-1.5)/8=0.8125
FO=(6.5-1.3)/6.5=0.80
BF=6270/(4.5876*1.608) * 0.67 = 0.5695
NOTA: DENSIDAD ESP=2.4/1.4925=1.608
FCV=1.608/2.4=0.67
P=0.75
2- KC=F(GRANULOMETRIA)
KC 1
1.02
1.10
1.25
100%
80%
60%
40%
7-UN CAMION DE 150 TON OPERA A RAZON DE 1 TURNO POR DIA, CON UNA PERDIDA
FIJA DE 1 HORA POR TURNO EMPLEANDO UN TIEMPO DE CICLO DE 20 MINUTOS. SI EL
COSTO DE TRANSPORTE ES DE 0.052 US$ / TONELADA.
DETERMINE EL PRECIO CIF DEL CAMION
CONSIDERE :
-FACTOR OPERACIONAL:
-VIDA UTIL:
-CHOFER:
-COMBUSTIBLE MAS LUBRICANTE:
-NEUMATICOS:
-FACTOR M Y R
0.82
7 AOS
4.5US%/HORA
2.0US$
500US$ C/U 70000 KM
0.80
DESARROLLO:
QHC=150 * 60/20*0.875*0.82=322.875 TON/HORA
HROP=8-1=7HORAS
DF=HROP
= 7/8=0.875
HRPROG
FO=HREF/HROP=0.82
HREF=0.82*7*25*12=1722HREF/AO
COSTO TOTAL=322.875TON/HORA * 0.052US$/TON= 16.789US$/HORA
COSTO FIJO=CIF-3000 + 0.10(7+1) * CIF/1722
7*1722
2*7
COSTO FIJO=
COSTO FIJO=0.00011614CIF-0.22888
COSTO VARIABLE=(4.5+2.0+1.60+0.80(0.00011614CIF 0.24888))*1,1
NOTITA: 37.5 KM EN UNA HORA , 70000 KM QUE ES LA VIDA UTIL DE LOS
NEUMATICOS, SE RECORRERAN EN 1866HORAS.(HORAS AL AO)
POR TANTO 3000US$/AO(EL PRECIO DE 6 NEUMATICOS)/1866 HR/AO=1.6 US$/HORA
COSTO VARIABLE=(8.1+0.000092912-0.199104)*1.1
COSTO VARIABLE=8.69+0.00010220CIF
REEMPLAZANDOO EN COSTO TOTAL
16.789US$/HR=(0.00011614CIF-0.24888)+8.69+0.00010220CIF
CIF=38235.68US$/HR
DISPONIBILIDAD FISICA
FACTOR OPERACIONAL
FACTOR DE LLENADO
TIEMPO DE CICLO REAL
TIEMPO DE DESCARGA
TIEMPO DE MANIOBRA
DIATANCIA RECORRIDO
VIDA UTIL
FACTOR M Y R
NEUMATICOS (UNIDAD)
5000US$/HR(80000KM)
MANO DE OBRA
COSTO COMBUSTIBLE
COSTO OPERACIN
CARGADOR
0.70
0.80
0.85
45 SEG
----------12 AOS
0.70
10000US$/HR
5US$/HR
4.8US$/HR
22.50
CAMION
0.90
---0.95(C/5%H)
---1.20MIN
0.80MIN
2800METROS
6 AOS
0.80
5US$/HR
5US$/HR
3.00
SE PIDE:
1-PRECIO CIF CAMION
2-COMENTE FLOTA REQUERIDA EN FAENA
3-QUE HARIA PARA OPTIMIZAR LA OPERACIN
DESARROLLO:
HREFECT (CARGADOR)=FO*DF*HRPROG=0.70*0,80*16=8,96HREFECT/DIA
224HREF/MES
2688HREF/AO
PRODUCCION HORARIA=330.000(TON/MES)*1(MES/25DIAS)*1(DIA/8,96HREF)
=1.473,214(TON/HR)
F.C.V=1/(1+E%)=DE/DRDE=1.71(TON/M3)
P(NPALADAS)=100(TON)*0.95*0.95
=8.121269PALADAS
10(YD^3)*0.85*1.17(TON/M^3)
=2,6296(CAMIONES/CARGADOR)3
QH(CARGADOR)=CP(M^3)*NC*DE*DF*FO*KR
=10(YD^3)*0.7646*(3600/45)*1.71(TON/M^3)*0.7*0.8*0.85
=494,94223(TON/HR)
X(NCARGADORES)=PRODUCCIN HORARIA/QH CARGADOR
=1.473,214(TON/HR)/494,94223(TON/HR)
=2,9763CARGADORES
3 CARGADORES9CAMIONES
=1.473,214(TON/HR)/9=163,694(TON/HR)
QH(CAMION)=CP(TON)*NC*KU*KR*% HUMEDAD
KU=
169,69(TON/HR)
100(TON)*(60/17.75)*0.95*0.95
=0.5365
ABSORCION DE IMPREVISTOS
LUBRICACION = 50% COMBUSTIBLE
DEPRECIACION HORARIA=CIF - (PRECIO NEUMATICOS * N DE NEUMATICOS)
VIDA UTIL*HRPROG*KU*300
CARGADOR FRONTAL
81.25%
54.6 MIN
40 SEG
0.90
-------------------300000US$/HR
12 AOS
CAMION
87.50%
----------0.9464
1.35 MIN
0.50 MIN
1000M
------6.5
1500US$/HR
800US$
12LT/HR
0.70
DESARROLLO
PALADAS=TON TOLVA*KR
TON BALDE*KR
PALADAS=100*0.9464
10*0.7646*0.90*1.72
PALADAS=7.998 PALADAS
TCC= 1.35+0.50+(1000/35*1000/60)+(1000/40*1000/60)+40*8/60
TCC=10.3976MIN
N=TCC/TCRP*P(NUMERO DE CAMIONES POR PALA)
N=10.3976MIN/40*8=2CAMIONES/CARGADOR
QH(CARGADOR)= 7.6455M3*(3600/40)*1.72*54.6/60*0.8125*0.90
QH(CARGADOR)=787.56 TON/HR
X(NUMERO DE CARGADORES)= 1180.84TON/HR/787.56TON/HR
= 1.45
= 2 CARGADORES
800US$
0.80
0.1(6.5+1)CIF
2*6.5*300*16*0.54055
CF=0.00005929CIF-0.1778 + 0.000022235
COSTO VARIABLE=(CHOFER + COMBUSTIBLE+LUBRICACION+(DEPRECIACION
HORARIA*FACTOR MY R)+INSUMOS)*1.1
COSTO VARIABLE= (4+2.48+1.24+((0.00005929CIF-0.1778)*0.80)+14.0625)*1.1
COSTO VARIABLE=23.804+5.217E-5
LUBRICACION=50%COMBUSTIBLE
INSUMOS=N NEUMATICOS *PRECIO NEUM.*VEL.PROMEDIO
VIDA UTIL NEUMATICO EN KM
INSUMOS=6*500*37.5/8000=14.0625
COSTO TOTAL=COSTO FIJO +COSTO VARIABLE
33.0635US$/HR=0.00005929CIF-0.1778 + 0.000022235CIF + 23.804+5.217E-5CIF
CIF=9.43/1.336E-4
CIF=70583
CARGADOR
0,75
36[SEG]
--------25,275US$/HR
------------------------------------------------
CAMION
--------2,45[MIN]
----6,5(AOS)
500
70000(KM)
0.80
1200(M)
4,50 US$/HR
2,50 US$
30%
DETERMINAR:
1-COMENTAR FACTOR DE EQUILIBRIO
2-SI EL COSTO DE CARGUIO Y TRANSPORTE ES DE 0,105[US$/TON]
3-CUAL ES EL PRECIO CIF DEL CAMION?
DESARROLLO.
HREFEC= 16*0,75= 12 HR
PRODUCCION HORARIA = 330300[TON/MES] / (25[DIAS/MES]*12[HR/DIA])
PRODUCCION HORARIA = 1101 TON / HORA
PALADAS =
50[TON]
= 6,81 = 7 PALADAS
4,5876[M^3]*1,60[TON/M^3]
TCC=2,45[MIN]+
1200[M]
+
1200[M]
+ 36[SEG]*7
40[KM/HR]*1000/60 35[KM/HR]*1000/60 60
TCC= 10,507[MIN]
N (N CAMIONES) = 10,507[MIN]/(36[SEG]*7/60) = 2,50 = 3 CAMIONES/CARGADOR
QH(CARGADOR)= 4,5873[M^3]*1,60[TON/M^3]*3600/36 * 0,75= 550,476[TON/HR]
X(N CARGADORES) = 1101[TON/HORA] / 550,476[TON/HR] = 2 CARGADORES
ENTONCES SON : 6 CAMIONES EN TOTAL OPERATIVOS EN LA FAENA
QH(CAMION)=1101[TON/HR] /6 = 183,5[TON/M^3]
FACTOR DE EQUILIBRIO= N*P*TCPR = 6*7*36/60 = 1,1992
X*TCC
2*10,507
EL VALOR 1,1992 (VER GRAFICA) IMPLICA QUE EL CARGUIO ESTA TRABAJANDO A UN
100%
PERO LOS CAMIONES NO, ENTONCES TIENEN Q ESPERAR.
QH(CAMION)=CP(TON)*NC*KU
KU= 183,5[TON/M^3]
50[TON]*60/10,507
= 0,64
0.1*(6,5 +1)*CIF
2*6.5*300*16*0.64
CIF=82013,65[US$/HR]