POBLACION DISTRITAL
POBLACION 2,007 6,307
TASA DE CRECIMIENTO 2.49
FUENTE: CENSOS NACIONALES 2007
PRO
2012 2013 2014 2015 2016 2017
METODO/AÑO
0 1 2 3 4 5
POBLACION METODO ARITMETICO 400 403 405 408 410 413
POBLACION METODO INTERES SIMPL 446 468 479 490 501 513
POBLACION METODO GEOMETRICO 439 450 461 472 484 496
IMD 2007
IMD 40
N POTENCIAL
AÑO
2018 2019 2020 2021 2022 2023
5 6 7 8 9 10
509 521 534 547 561 575
AL
ÑO
2030 2031 2032 2033
17 18 19 20
683 700 718 735
DEMANDANTE
AÑO
2016 2017 2018 2019 2020 2021
5 6 7 8 9 10
509 521 534 547 561 575
DOS)
2017 2018 2019 2020 2021 2021
6 7 8 9 10 11
55 57 60 62 65
47 48 49 50 51
46 48 49 50 51
TENCIAL
AÑO
2016 2017 2018 2019 2020 2021
5 6 7 8 9 10
45 46 48 49 50 51
2027 2028 2029 2030 2031 2032 2033
15 16 17 18 19 20 21
438 440 443 445 448 450 453
624 635 646 657 668 679 446
635 650 667 683 700 718 735
FORMATO RESUMEN DEL DIA - CLASIFICACION VEH
ESTUDIO DE TRAFICO
TRAMO DE LA CARRETERA
SENTIDO E S
UBICACIÓN
DIAGRA.
VEH.
L 250 270 90 25 15 0
M 259 272 95 26 14 2
M 251 275 94 27 16 2
J 252 271 93 26 17 0
V 258 274 92 24 16 0
S 250 273 94 27 15 0
D 251 272 93 24 14 2
23 - 24
TOTAL 253 0 272 0 93 0 0 0 26 15 1
ENCUESTADOR : ______________________ JEFE DE BRIGADA : ____________________ ING.RESPONS: __________________
TRAMO DE LA CARRETERA
SENTIDO E S
UBICACIÓN
DIAGRA.
VEH.
L
M
M
J
V
S
D
23 - 24
TOTAL 0 0 0 0 0 0 0 0 0 0 0
85 65
83 64
86 67
85 65
84 66
83 63
85 65
FORMATO Nº 2
SIFICACION VEHICULAR
FICO
ESTACION
CODIGO DE LA ESTACION
DIA Y FECHA LUNES 11 A DOMINGO 17
650
668
665
659
664
659
656
0 0 0 0 0 0 0 0 660
______________ SUPERV.MTCC : ________________________
FORMATO Nº 2
SIFICACION VEHICULAR
FICO
ESTACION
CODIGO DE LA ESTACION
DIA Y FECHA LUNES 11 A DOMINGO 17
70 35 105
65 30 95
72 32 104
74 34 108
73 35 108
75 38 113
78 38 116
0 0 0 0 0 0 72 35 107
TRAMO DE LA CARRETERA
SENTIDO E S
UBICACIÓN
DIAGRA.
VEH.
L 254 276 93 24 15 2
M 252 277 94 26 14 0
M 250 270 95 25 16 0
J 257 278 92 23 17 0
V 252 275 91 26 15 2
S 252 278 93 27 14 0
D 250 276 92 22 16 2
23 - 24
TOTAL 252 0 276 0 93 0 0 0 25 15 1
1767 0 1930 0 650 0 0 0 173 107 6
ENCUESTADOR : ______________________ JEFE DE BRIGADA : ____________________ ING.RESPONS: __________________
1767
FORMATO Nº 2
SIFICACION VEHICULAR
FICO
ESTACION
CODIGO DE LA ESTACION
DIA Y FECHA LUNES 11 A DOMINGO 17
0
664
663
656
667
661
664
658
0 0 0 0 0 0 0 0 662
______________ SUPERV.MTCC : ________________________
CONTEO DE TRAFICO VEHICULAR SEMANA 01 (IMD)
TIPO DE
Lunes Martes Miércoles Jueves Viernes Sábado Domingo TOTAL
VEHICULO
Auto 250 259 251 252 258 250 251 1,771
Camioneta 270 272 275 271 274 273 272 1,907
C.R. 90 95 94 93 92 94 93 651
Micro 0
Bus 0
Camion 2 Ejes 25 26 27 26 24 27 24 179
Camion 3 Ejes 15 14 16 17 16 15 14 107
Camion 4 Ejes 0 2 2 0 0 0 2 6
Articulado 0 0 0 0 0 0 0 0
TOTAL 650 668 665 659 664 659 656 4,621
TIPO DE VEHICULO Lunes Martes Miércoles Jueves Viernes Sábado Domingo TOTAL
Moto lineal 85 83 82 84 85 83 84 586
Mototaxi-
Motocar 40 41 42 43 42 43 41 292
CONTEO DE TRAFICO VEHICULAR SEMANA 02 (IMD)
TIPO DE
Lunes Martes Miércoles Jueves Viernes Sábado Domingo TOTAL
VEHICULO
Auto 254 252 250 257 252 252 250 1,767
Camioneta 276 277 270 278 275 278 276 1,930
C.R. 93 94 95 92 91 93 92 650
Micro 0
Bus 0
Camion 2 Ejes 24 26 25 23 26 27 22 173
Camion 3 Ejes 15 14 16 17 15 14 16 107
Camion 4 Ejes 2 0 0 0 2 0 2 6
Articulado 0 0 0 0 0 0 0 0
TOTAL 664 663 656 667 661 664 658 4,633
CONTEO DE TRAFICO VEHICULAR (IMD)
TIPO DE
Lunes Martes Miércoles Jueves Viernes Sábado Domingo TOTAL
VEHICULO
Auto 252 257 253 253 256 252 253 1,775
Camioneta 273 274 276 274 275 275 274 1,920
C.R. 92 94 94 93 93 94 93 651
Micro 0 0 0 0 0 0 0 0
Bus 0 0 0 0 0 0 0 0
Camion 2 Ejes 25 25 26 25 24 26 24 174
Camion 3 Ejes 15 15 16 16 16 15 15 106
Camion 4 Ejes 1 2 2 1 1 1 2 10
Articulado 0 0 0 0 0 0 0 0
TOTAL 657 666 665 662 664 662 660 4,635
662
POBLACION TOTAL CENTRO POBLADO DE SACHABAMBA POBLACION SACHABAMBA
3,200.00
afp 416.00
aporte 160.00
lelia 500.00
leo 50.00
cuarto 450.00
pension 250.00
polos 40.00
faltas 150.00
rpm 60.00
polo ennio 80.00 2,156.00
mause 20.00
cooler 150.00
matricula 250.00 420.00
2,576.00
624
ACHABAMBA FACTORES DE CONVERSION
100.00%
2570
1258.50515463918
1311.49484536082
1800 55.68%
881.443298969072
918.556701030928
4
47.5
49.5
97.00
CICLO DEL PROYECTO - HORIZONTE DE EVALUACION
PRE POST
INVERSION
INVERSION INVERSION
ESTUDIO OPERACIÓN Y
PERFIL EJECUCION
DEFINITIVO MANTENIMIENTO
809
450.481133
97
CALENDARIO PARA ADJUDICACION MAT
GRUPO DE
PROCESO DIAS INVOLUCRADOS
Municipalidad
Distrital de Santa
Aprobación de expediente 5 Rosa
Representantes de
la Comunidad
Elaboración de bases del concurso 3
Transportistas
Convocatoria 1
SEASE (días hábiles) 12
Buena pro 8
Presentacion de docuemntos 8
Ejecución del proyecto
MATRIZ DE INVOLUCRADOS
CONFLICTOS
PROBLEMAS PERCIBIDOS INTERESES
POTENCIALES
Mejorar las calles y
Vías en malas condiciones y
avenidas de la capital
constantes quejas de Ninguno
del Centro Poblado de
transportitas
Mayor gasto y vecinos
tiempo en el Comumpiari
Disminuir el costo y
transporte interurbano entre los
tiempo del transporte Ninguno
diferentes sectores de la
interurbano
localidad
Presencia de polvo y charcos Eliminar la situación de
de agua que favorecen las riesgo para las Ninguno
enfermedades en la población enfermedades
Ahorro en gastos de
Mayor gasto en la operación y operación y
Ninguno
mantenimiento de vehículos mantenimiento
vehicular
OFERTA ACTUAL - SIN PROYECTO
I. CARACTERISTICAS DE LA VIA
Longitud (ml) 1721.02
Area de pavimento (m2) 0.00
IMD (Veh./día) 662.00
Pendiente máxima (%) 15.00%
Pendiente mínima (%) 1.00%
Carpeta de rodadura suelo natural
Ancho de calzada de rodadura promedio (mt) 7.70
Plazoleta de estacionamiento (m2) 0.00
Area verde (m2) 0.00
II. OTRAS ESTRUCTURAS EN LA VIA
Faroles (Unid.) 0.00
Reubicación de redes secundarias (Unid.) 0.00
Bancas de descanso (Unid.) 0.00
Tacho de basura (Unid.) 0.00
Grifo contra incendios (Unid.) 0.00
III. VEREDAS
Area de veredas (m2) 0.00
Concreto Fc Kg/cm2 0.00
CANALES DE DERIVACION DE AGUAS
IV. SUPERFICIALES
Sección de canal (cm) 0.00
Longitud de canal (ml) 0.00
V. IMPACTO AMBIENTAL
Zonas de botaderos 0.00
DEMANDA DE INFRAESTRUCTURA VIAL
TOTAL VIA
I. CARACTERISTICAS DE LA VIA
1,721.02 Longitud (m)
0.00 Area de pavimento (m2)
662.00 IMD (Veh./día)
15.00% Pendiente máxima (%)
1.00% Pendiente mínima (%)
suelo natural Carpeta de rodadura
7.70 Ancho de calzada de rodadura promedio (mt)
0.00 Plazoleta de estacionamiento (m2)
0.00 Area verde (m2)
II. OTRAS ESTRUCTURAS EN LA VIA
0.00 Faroles (Unid.)
0.00 Reubicación de redes secundarias (Unid.)
0.00 Bancas de descanso (Unid.)
0.00 Tacho de basura (Unid.)
0.00 Grifo contra incendios (Unid.)
III. VEREDAS
0.00 Area de veredas (m2)
0.00 Concreto Fc Kg/cm2
CANALES DE DERIVACION DE AGUAS
IV. SUPERFICIALES
0.00 Sección de canal (cm)
0.00 Longitud de canal (ml)
V. IMPACTO AMBIENTAL
0.00 Zonas de botaderos
8.00
10.00
8.90
10.60
15.50
9.53 114.73
10.80
6.00
4.00
6.80
9.00
5.00
3.00
7.60
EMANDA DE INFRAESTRUCTURA VIAL PROPU
I.
1,721.02 1,721.02
13,998.48 13,998.48
662.00 662.00
5.73% 5.73%
0.60% 0.60%
Pavimento Pavimento
7.70 7.70
0.00 0.00
472.84 472.84
II.
0.00 0.00
0.00 0.00
0.00 0.00
18.00 18.00
0.00 0.00
III.
4,366.91 4,366.91
175 175
IV.
0.45*0.30 0.45*0.30
1,721.02 1,721.02
V.
0 0
13 8.83
752.524
87.216
839.74
PROPUESTA TECNICA ALTERNATIVA Nº 1
CARACTERISTICAS DE LA VIA
Longitud (ml) 1,721.02
Area de pavimento (m2) 13,998.48
IMD (Veh./día) 662.00
Pendiente máxima (%) 5.73%
Pendiente mínima (%) 0.60%
Carpeta de rodadura Pavimento Rigido
Ancho de calzada de rodadura promedio (mt) 7.70
Plazoleta de estacionamiento (m2) 0.00
Area verde (m2) 472.84
OTRAS ESTRUCTURAS EN LA VIA
Faroles (Unid.) 0.00
Reubicación de redes secundarias (Unid.) 0.00
Bancas de descanso (Unid.) 0.00
Tacho de basura (Unid.) 18.00
Grifo contra incendios (Unid.) 0.00
VEREDAS
Area de veredas (m2) 4,366.91
Concreto Fc Kg/cm2 175
CANALES DE DERIVACION DE AGUAS
SUPERFICIALES
Sección de canal (cm) 0.45*0.30
Longitud de canal (ml) 1,721.02
IMPACTO AMBIENTAL
Zonas de botaderos 0.00
PROPUESTA TECNICA ALTERNATIVA Nº 2
TOTAL VIA
I. CARACTERISTICAS DE LA VIA
1,721.02 Longitud (m)
13,998.48 Area de pavimento (m2)
662.00 IMD (Veh./día)
5.73% Pendiente máxima (%)
0.60% Pendiente mínima (%)
Pavimento Rigido Carpeta de rodadura
7.70 Ancho de calzada de rodadura promedio (mt)
0.00 Plazoleta de estacionamiento (m2)
472.84 Area verde (m2)
II. OTRAS ESTRUCTURAS EN LA VIA
0.00 Faroles (Unid.)
0.00 Reubicación de redes secundarias (Unid.)
0.00 Bancas de descanso (Unid.)
18.00 Tacho de basura (Unid.)
0.00 Grifo contra incendios (Unid.)
III. VEREDAS
4,366.91 Area de veredas (m2)
175 Concreto Fc Kg/cm2
CANALES DE DERIVACION DE AGUAS
IV.
SUPERFICIALES
0.45*0.30 Sección de canal (cm) 1
1,721.02 Longitud de canal (ml)
V. IMPACTO AMBIENTAL
0.00 Zonas de botaderos
PROPUESTA TECNICA ALTERNATIVA Nº 2
1,721.02 1,721.02 I.
13,998.48 13,998.48
662.00 662.00
11.44% 11.44%
0.60% 0.60%
Pavimento Flexible Pavimento Flexible
7.70 7.70
0.00 0.00
472.84 472.84
0.45*0.30 0.45*0.30 V
1,721.02 1,721.02
0.00 0.00 VI
BALANCE OFERTA DEMANDA
CARACTERISTICAS DE LA VIA
Longitud (ml) 1,721.02 1,721.02 0.00
Area de pavimento (m2) 0.00 13,998.48 13,998.48
IMD (Veh./día) 662 662 0.00
Pendiente máxima (%) 15.00% 5.73% 9.26%
Pendiente mínima (%) 1.00% 0.60% 0.40%
Carpeta de rodadura suelo natural Pavimento Pavimento
Ancho de calzada de rodadura promedio (mt) 7.7 7.7 0.00
Plazoleta de estacionamiento (m2) 0.00 0.00 0.00
Area verde (m2) 0.00 472.84 472.84
OTRAS ESTRUCTURAS EN LA VIA
Faroles (Unid.) 0.00 0.00 0.00
Reubicación de redes secundarias (Unid.) 0.00 0.00 0.00
Bancas de descanso (Unid.) 0.00 0.00 0.00
Tacho de basura (Unid.) 18.00 18.00 18.00
Grifo contra incendios (Unid.) 0.00 0.00 0.00
VEREDAS
Area de veredas (m2) 0.00 4,366.91 4,366.91
Concreto Fc Kg/cm2 0.00 175 175
CANALES DE DERIVACION DE AGUAS SUPERFICIALES
Sección de canal (cm) 1 0.00 0.45*0.30 0.45*0.30
Longitud de canal (ml) 0.00 1,721.02 1,721.02
IMPACTO AMBIENTAL
Zonas de botaderos 0.00 0.00 0.00
MEJORAMIENTO DE VÍAS URBANAS EN 08
CALLES EL DE LA LOCALIDAD DE
SACHABAMBA EN EL DISTRITO DE CHIARA -
FACTORES DE CONVERSION
HUAMANGA - AYACUCHO ALTERNATIVA 02
ora
Ext
mp
ent
e impactos
siv
cal
rm
Lo
Pe
Te
an
en
o
e
l
0.75 Preoperación o
Inversion:
Medio físico
. Agua X X
- Suelo X X
Medio biológico
Medio
paisajista y
Medio
cultural
socioeconómic
Operación:
o
Medio físico
. Agua X X
- Suelo X X
Medio biológico
Medio
paisajista y
Medio
cultural
socioeconómic
o
DE IMPACTO AMBIENTAL
Magnitud
der
Mo
ert
Fu
Le
ad
ve
e
X
X
CONTEO DE TRAFICO VEHICULAR (IMD)
TIPO DE
Lunes Martes Miércoles Jueves Viernes Sábado Domingo TOTAL
VEHICULO
Auto 252 257 253 253 256 252 253 1,775
666
664
662
660
658
656
654
652
s s es s s o go
ne te ol ve ne ad
Lu ar c ue er b in
M iér J Vi Sá Do
m
M Dias de la Semana
CONTEO DE TRAFICO VEHICULO MOTORIZADO (IMD)
TIPO DE VEHICULO Lunes Martes Miércoles Jueves Viernes Sábado Domingo TOTAL
Moto lineal 85 83 82 84 85 83 84 586
Mototaxi-
Motocar 40 41 42 43 42 43 41 292
FACTORES DE CORRECCION CALCULO DE IMDa
TIPO DE
VEHICULO FACTOR Lunes Martes Miércoles
VEHICULO
Ligeros 1.0117
Auto 252 257 253
Pesados 1.0125 Camioneta 273 274 276
C.R. 92 94 94
Micro 0 0 0
Bus 0 0 0
Camion 2 Ejes 25 25 26
Camion 3 Ejes 15 15 16
Camion 4 Ejes 1 2 2
Articulado 0 0 0
TOTAL 657 666 665
Porcentaje (%)
45%
40%
35%
30%
25%
20%
15%
10%
5%
0%
to ta R.
Au ne C.
io
m
Ca
CALCULO DE
TIPO DE
VEHICULO Lunes Martes Miércoles
Moto lineal 85 83 82
Mototaxi-
Motocar 40 41 42
TOTAL 125 124 124
CALCULO DE IMDa NORMAL IMDa NORMAL
TOTAL TIPO DE
Jueves Viernes Sábado Domingo IMDs FC IMDa
SEMANA VEHICULO
IMDa NORMAL
45%
40%
35%
30%
25%
20%
15%
10%
5%
0%
to ta R. o s s s s o
Au ne C. icr Bu Eje Eje Eje lad
io M 2 3 4 cu
m n n n rti
Ca io io io A
m m m
Ca
Tipo de vehículo Ca Ca
CALCULO DE IMDa IMDa NORMAL
TIPO DE
Jueves Viernes Sábado Domingo TOTAL IMDs FC IMDa VEHICULO
84 85 83 84 586 84 1.0117 85 Moto lineal
Mototaxi-
43 42 43 41 292 42 1.0125 42 Motocar
127 127 126 125 878 125 127 TOTAL
IMDa NORMAL TASA DE CRECIMIENTO TRAFICO GENERADO
Veh/día % TASA DE CRECIMIENTO % INTERVENCION
% TIPO DE Tasa de
VEHICULO Crec. 2013 2014 2015 2016 2017 2018 2019 2020
15% Moto lineal 5.80% 85 87 89 91 93 96 98 101
Mototaxi- 2.49%
Motocar 42.24 43 44 45 47 48 49 50
SUB TOTAL 127 130 133 137 140 144 147 151
312 320 328 336 345 353 362 371 380 390 399 409 419
338 346 355 364 373 382 391 401 411 421 432 443 454
115 117 120 123 126 130 133 136 139 143 146 150 154
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
39 42 44 47 49 52 55 58 62 65 69 73 77
24 25 27 29 30 32 34 36 38 40 42 45 47
2 2 3 3 3 3 3 3 4 4 4 4 4
0 0 0 0 0 0 0 0 0 0 0 0 0
830 853 877 901 926 952 978 1,006 1,034 1,063 1,093 1,124 1,156
2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
103 106 108 111 114 117 120 122 126 129 132 135 139
51 53 54 55 57 58 60 61 63 64 66 67 69
155 158 162 166 171 175 179 184 188 193 198 203 208
2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
15 16 16 17 17 17 18 18 19 19 20 20 21
8 8 8 8 9 9 9 9 9 10 10 10 10
23 24 24 25 26 26 27 28 28 29 30 30 31
2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
118.6 121.5 125 128 131 134 137 141 144 148 152 155 159
59.13 60.61 62.11 63.66 65.25 66.87 68.54 70.24 72 73.78 75.62 77.5 79.43
177.71 182.135 186.67 191.318 196.082 200.965 205.969 211.097 216.354 221.741 227.262 232.921 238.721
ESCENARIO PARA EL ANALISIS
TIPO DE
SITUACION ESCENARIO DISTANCIA KM
VEHICULO
Sin Proyecto Selva, Ondulada, Afirmada en mal estado 1.721
Auto
Con Proyecto Selva, Ondulada, Asfaltada en buen estado 1.721 Camioneta
C.R.
Micro
Bus
Camion 2 Ejes
Camion 3 Ejes
Camion 4 Ejes
Articulado
TOTAL
CALCULO DE IMDa NORMAL
TOTAL
Lunes Martes Miércoles Jueves Viernes Sábado Domingo IMDs FC IMDa
SEMANA
252 257 253 253 256 252 253 1,775 254 1.0117 256
273 274 276 274 275 275 274 1,920 274 1.0117 277
92 94 94 93 93 94 93 651 93 1.0117 94
0 0 0 0 0 0 0 0 0 1.0125 0
0 0 0 0 0 0 0 0 0 1.0125 0
25 25 26 25 24 26 24 174 25 1.0125 25
15 15 16 16 16 15 15 106 15 1.0125 15
1 2 2 1 1 1 2 10 1 1.0125 1
0 0 0 0 0 0 0 0 0 1.0125 0
657 666 665 662 664 662 660 4,635 662 670
300
250
200
150
Column CA
100
50
0
to ta R. o s s s s o
Au ne C. icr Bu Eje Eje Eje lad
io M 2 3 4 cu
m n n n rti
Ca io io io A
am am am
C C C
IMDa NORMAL TASA DE CRECIMIENTO
TIPO DE
Veh/día % TASA DE CRECIMIENTO %
VEHICULO
T.C. Poblacion 2.49%
Auto 256 38.29%
Camioneta 277 41.42% T.C. PBI 5.80%
C.R. 94 14.05%
Micro 0 0.00%
Bus 0 0.00%
Camion 2 Ejes 25 3.75%
Camion 3 Ejes 15 2.29%
Camion 4 Ejes 1 0.22%
Articulado 0 0.00%
TOTAL 670 100.00%
TRAFICO GENERADO PROY
TIPO DE Tasa de
INTERVENCION % 2013 2014 2015
VEHICULO Crec.
Mejoramiento 15%
Auto 2.49% 256 263 269
Camioneta 2.49% 277 284 291
C.R. 2.49% 94 96 99
Micro 2.49% 0 0 0
Bus 2.49% 0 0 0
Camion 2 Ejes 5.80% 25 27 28
Camion 3 Ejes 5.80% 15 16 17
Camion 4 Ejes 5.80% 1 2 2
Articulado 5.80% 0 0 0
TOTAL 670 688 707
PROYECCIÓ
TIPO DE Tasa de
2013 2014 2015
VEHICULO Crec.
Auto 2.49% 39 40
Camioneta 2.49% 43 44
C.R. 2.49% 14 15
Micro 2.49% 0 0
Bus 2.49% 0 0
Camion 2 Ejes 5.80% 4 4
Camion 3 Ejes 5.80% 2 3
Camion 4 Ejes 5.80% 0 0
Articulado 5.80% 0 0
TOTAL 0 103 106
PROYECCIÓN DE T
TIPO DE Tasa de
2013 2014 2015
VEHICULO Crec.
Auto 2.49% 256 302 310
Camioneta 2.49% 277 327 335
C.R. 2.49% 94 111 114
Micro 2.49% 0 0 0
Bus 2.49% 0 0 0
Camion 2 Ejes 5.80% 25 31 32
Camion 3 Ejes 5.80% 15 19 20
Camion 4 Ejes 5.80% 1 2 2
Articulado 5.80% 0 0 0
TOTAL 670 791 812
PROYECCION DEL TRAFICO NORMAL (Veh/día)
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
276 283 290 297 305 312 320 328 336 345 353 362 371 380 390 399
299 306 314 322 330 338 346 355 364 373 382 391 401 411 421 432
101 104 106 109 112 115 117 120 123 126 130 133 136 139 143 146
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
30 31 33 35 37 39 42 44 47 49 52 55 58 62 65 69
18 19 20 22 23 24 25 27 29 30 32 34 36 38 40 42
2 2 2 2 2 2 2 3 3 3 3 3 3 4 4 4
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
726 745 766 787 808 830 853 877 901 926 952 978 1,006 1,034 1,063 1,093
Inversión 0.79
409 419
443 454 Mantenimiento y Operación 0.75
150 154
0 0
0 0
73 77
45 47
4 4
0 0
1,124 1,156
2032 2033
61 63
66 68
23 23
0 0
0 0
11 12
7 7
1 1
0 0
169 173
2032 2033
471 482
509 522
173 177
0 0
0 0
84 89
51 54
5 5
0 0
1,293 1,330
ANALISIS Y JERARQUIZACION DE IMPACTO AMBIENTAL
Temporalidad Extensión Magnitud
Etapas, componentes e
Exten
impactos
Temp
anent
Mode
Local
Fuert
Perm
Leve
rado
sivo
oral
e
Preoperación o Inversion:
Medio físico
. Agua X X X
- Suelo X X X
Medio biológico
Medio socioeconómico
Operación:
Medio físico
. Agua X X X
- Suelo X X X
Medio biológico
Medio socioeconómico
MUNICIPALIDAD DISTRITAL DE SANTA ROSA
REGION : AYACUCHO
PROVINCIA : HUAMANGA
PRESUPUESTO ALTERNATIVA 01
01 OBRAS PRELIMINARES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 4.80 X 2.40 m und
01.02 CAMPAMENTO PROVISIONAL DE OBRAS m2
02 OBRAS PROVISIONALES
02.01 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS glb
02.02 TRAZO Y REPLANTEO GENERAL m2
02.03 LIMPIEZA DEL TERRENO MANUAL m2
03 PAVIMENTOS Y CALZADAS
03.01 OBRAS PROVISIONALES
03.01.01 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCIÓN m2
03.02 MOVIMIENTO DE TIERRAS
03.02.01 CORTE DE MATERIAL SUELTO m3
03.02.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DM<=1KM m3
03.03 CALZADA
03.03.01 PERFILADO Y COMPACTADO DE SUB RASANTE EN ZONAS-CORTE R=2420 m2/día m2
03.03.03 MEZCLADO DE MATERIAL GRANULAR Y LIGANTE PARA BASE GRANULAR E=0.20M. m3
03.03.04 CONFORMACION Y COMPACTACION DE BASE GRANULAR E=0.20 M m2
03.04 OBRAS DE CONCRETO
03.04.01 CONCRETO f'c=210 kg/cm2 m3
03.04.02 ENCOFRADO Y DESENCOFRADO - PISTAS m2
03.04.03 ACABADO EN LOSA DE CONCRETO m2
03.04.04 CURADO DE CONCRETO m2
03.04.05 JUNTAS ASFALTICAS m
03.04.06 ENCIMADO DE BUZONES - TECHO Y TAPA und
04 VEREDAS Y MARTILLO
04.01 OBRAS PROVISIONALES
04.01.01 TRAZO Y REPLANTEO DURANTE EL PROCESO DE EJECUCIÓN m2
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL m3
04.02.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DM<=1KM m3
04.02.03 RELLENO CON MATERIAL SELECCIONADO m3
04.02.04 PERF. Y COMPAC. DE SUB-RASANTE CON PLANCHA COMPACTADORA m2
04.02.05 AFIRMADO Y COMPACTADO E=0.10M. PARA VEREDA m2
04.03 CONCRETO SIMPLE EN VEREDAS Y MARTILLO
04.03.01 CONCRETO F'C=175 KG/CM2+ 30 % PM. m2
04.03.02 ACABADO Y BRUÑADO EN VEREDAS m2
04.03.03 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2
04.03.04 CURADO DE CONCRETO m2
04.03.05 JUNTAS ASFALTICAS EN VEREDAS Y MARTILLO m
05 DRENAJE PLUVIAL
05.01 OBRAS PROVISIONALES
05.01.01 TRAZO Y REPLANTEO DURANTE EL PROCESO DE EJECUCIÓN m2
05.02 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION MANUAL m3
05.02.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DM<=1KM m3
05.02.03 PERF. Y COMPAC. DE SUB-RASANTE CON PLANCHA COMPACTADORA m2
05.02.04 AFIRMADO, COMPACTADO Y RIEGO E=0.10M. EN DRENAJE PLUVIAL m2
05.03 CONCRETO ARMADO
05.03.01 SOLADO, f'c=100 kg/cm2 (e=2") m2
05.03.02 CONCRETO f'c=210 kg/cm2 m3
05.03.03 ENCOFRADO Y DESENCOFRADO - CANAL DE DRENAJE PLUVIAL m2
05.03.04 CURADO DE CONCRETO m2
05.03.05 REJILLA METALICA PARA CANALETAS A= 0.60 M m
05.03.06 JUNTAS ASFALTICAS EN DENAJE PLUVIAL m
06 SARDINELES Y AREAS VERDES
06.01 OBRAS PROVISIONALES
06.01.01 TRAZO Y REPLANTEO DURANTE EL PROCESO DE EJECUCIÓN m2
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION PARA SARDINELES m3
06.02.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DM<=1KM m3
06.03 OBRAS DE CONCRETO
06.03.01 CONCRETO f'c=140 kg/cm2 m3
06.03.02 ENCOFRADO Y DESENCOFRADO - SARDINEL m2
06.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg
06.03.04 ACABADO EN SARDINEL m2
06.03.05 CURADO DE CONCRETO m2
06.03.06 JUNTAS ASFALTICAS EN SARDINELES m
06.04 SEMBRADO DE GRASS
06.04.01 PREPARACION Y ZARANDEO DE TIERRA DE CHACRA m3
06.04.02 TRANSPORTE Y COLOCADO DE TIERRA DE CHACRA EN JARDIN m3
06.04.03 SEMBRADO DE GRAS EN JARDINERIA m2
06.04.04 RIEGO DE GRAS EN JARDINERIA m2
06.05 PLANTAS ORNAMENTALES
06.05.01 EXCAVACION DE HOYOS m3
06.05.02 SEMBRADO DE PLANTAS ORNAMENTALES und
06.06 GRIFOS PARA RIEGO
06.06.01 INSTALACION DE GRIFOS PARA RIEGO und
07 EQUIPAMENTO URBANO
07.01 TACHOS DE BASURA
07.01.01 EXCAVACION MANUAL PARA ESTRUCTURAS m3
07.01.02 CONCRETO f'c=140 kg/cm2 m3
07.01.03 TACHOS DE BASURA und
07.02 SEÑALIZACION
07.02.01 SEÑALIZACION EN CRUZES DE VIAS m
07.02.02 SEÑALES PREVENTIVAS DE TRANSITO R=30 und/dia und
07.02.03 SEÑALES INFORMATIVAS DE INTERSECCION DE VIAS und
08 IMPACTO AMBIENTAL
08.01 MEDIDAS DE MITIGACION
08.01.01 RECOLECCION DE RESIDUOS SOLIDOS EN ZONA DE TRABAJO mes
08.01.02 CONSTRUCCION DE LETRINAS TEMPORALES und
08.01.03 CONSTRUCCION DE POZO DE RESIDUO SOLIDO m3
09 FLETE EN OBRA
09.01 ACARREO DE CEMENTO DE ALMACEN A OBRA bol
09.02 ACARREO DE ACERO EN OBRA kg
09.03 ACARREO DE MADERA PARA ENCOFRAR EN OBRA p2
09.04 FLETE TERRESTRE POR TRANSPORTE DE MATERIALES glb
COSTO DIRECTO
SUBTOTAL
IGV
VALOR REFERENCIAL
EXPEDIENTE TECNICO
COSTO TOTAL
COMPONENTES UND
COSTO DE INFRAESTRUCTURA GLB
GATOS GENERALES GLB
GASTOS DE SUPERVISION GLB
UTILIDAD GLB
IGV GLB
EXPEDIENTE TECNICO GLB
COSTOS TOTAL DE INVERSION
Rubro Unid.
COSTO DIRECTO
OBRAS PRELIMINARES GLB
OBRAS PROVISIONALES GLB
PAVIMENTOS Y CALZADAS GLB
VEREDAS Y MARTILLO GLB
DRENAJE PLUVIAL GLB
SARDINELES Y AREAS VERDES GLB
EQUIPAMENTO URBANO GLB
IMPACTO AMBIENTAL GLB
FLETE EN OBRA GLB
1er
METAS
Semestre
2013
OBRAS PRELIMINARES
OBRAS PROVISIONALES
PAVIMENTOS Y CALZADAS
VEREDAS Y MARTILLO
DRENAJE PLUVIAL
EQUIPAMENTO URBANO
IMPACTO AMBIENTAL
FLETE EN OBRA
TOTAL COSTO DIRECTO
SUBTOTAL
IGV
COSTO TOTAL
1er
METAS
Semestre
2013
OBRAS PRELIMINARES
OBRAS PROVISIONALES
PAVIMENTOS Y CALZADAS
VEREDAS Y MARTILLO
DRENAJE PLUVIAL
EQUIPAMENTO URBANO
IMPACTO AMBIENTAL
FLETE EN OBRA
SUBTOTAL
IGV
VA 01
2,687,115.14
241,840.36
161,226.91
3,090,182.41
556,232.83
3,646,415.24
91,160.38
20,000.00
3,757,575.62
ADOS
2,687,115.14
241,840.36
161,226.91
3,090,182.41
556,232.83
3,646,415.24
91,160.38
20,000.00
3,757,575.62
Semestre(Nuevos Soles)
2do 3er
2013 2013
20,000.00
18,082.40 18,082.40
32,564.04 32,564.04
1,382,097.66 1,382,097.66
250,642.53 250,642.53
687,905.73 687,905.73
Semestre
2do 3er
2013 2013
100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
18,082.40
32,564.04
1,382,097.66
250,642.53
687,905.73
74,131.88
27,067.03
6,282.70
208,341.14
2,687,115.14
241,840.36
161,226.91
3,090,182.41
556,232.83
3,646,415.24
91,160.38
3,737,575.62
18,082.40
32,564.04
1,382,097.66
250,642.53
687,905.73
74,131.88
27,067.03
6,282.70
208,341.14
Subtotal 3,090,182.41
===================
Subtotal 3,090,182.41
IGV (18%) 556,232.83
===================
MUNICIPALIDAD DISTRITAL DE SANTA ROSA
REGION : AYACUCHO DISTRITO
PROVINCIA : HUAMANGA LUGAR
PRESUPUESTO ALTERNATIVA 02
01 OBRAS PRELIMINARES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 4.80 X 2.40 m und 1.00
01.02 CAMPAMENTO PROVISIONAL DE OBRAS m2 120.00
02 OBRAS PROVISIONALES
02.01 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS glb 1.00
02.02 TRAZO Y REPLANTEO GENERAL m2 21,471.65
02.03 LIMPIEZA DEL TERRENO MANUAL m2 21,471.65
03 PAVIMENTOS Y CALZADAS
03.01 OBRAS PROVISIONALES
03.01.01 TRAZO Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCIÓN m2 21,471.65
03.02 MOVIMIENTO DE TIERRAS
03.02.02 CORTE DE MATERIAL SUELTO m3 11,479.70
03.02.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DM<=1KM m3 14,349.63
03.03 CALZADA
03.03.01 PERFILADO Y COMPACTADO DE SUB RASANTE EN ZONAS-CORTE R=2420 m2/día m2 13,998.48
03.03.04 MEZCLADO DE MATERIAL GRANULAR Y LIGANTE PARA BASE GRANULAR E=0.20M. m3 2,799.70
03.04 PAVIMENTO ASFALTICO
03.04.01 IMPRIMACION ASFALTICA m2 13,998.48
03.04.02 RIEGO DE LIGA m2 13,998.48
03.04.03 TRATAMIENTO SUPERFICIAL BICAPA m2 13,998.48
03.04.04 BASE ESTABILIZADA m3 2,799.70
03.04.05 PERFILADO Y COMPACTADO DE BASE ESTABILIZADA m2 13,998.48
03.04.06 CURADO DE BASE ESTABILIZADA m2 13,998.48
03.04.07 MICROPROCESADO PARA PERFILADO FINAL m3 2,799.70
03.04.08 CARPETA ASFALTICA m3 2,799.50
03.04.09 ENCIMADO DE BUZONES - TECHO Y TAPA und 13.00
04 VEREDAS Y MARTILLO
04.01 OBRAS PROVISIONALES
04.01.01 TRAZO Y REPLANTEO DURANTE EL PROCESO DE EJECUCIÓN m2 4,366.91
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL m3 1,841.20
04.02.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DM<=1KM m3 2,209.44
04.02.03 RELLENO CON MATERIAL SELECCIONADO m3 161.62
04.02.04 PERF. Y COMPAC. DE SUB-RASANTE CON PLANCHA COMPACTADORA m2 4,366.91
04.02.05 AFIRMADO Y COMPACTADO E=0.10M. PARA VEREDA m2 4,366.91
04.03 CONCRETO SIMPLE EN VEREDAS Y MARTILLO
04.03.01 CONCRETO F'C=175 KG/CM2+ 30 % PM. m2 4,366.91
04.03.02 ACABADO Y BRUÑADO EN VEREDAS m2 4,366.91
04.03.03 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 481.41
04.03.04 CURADO DE CONCRETO m2 4,366.91
04.03.05 JUNTAS ASFALTICAS EN VEREDAS Y MARTILLO m 3,209.42
05 DRENAJE PLUVIAL
05.01 OBRAS PROVISIONALES
05.01.01 TRAZO Y REPLANTEO DURANTE EL PROCESO DE EJECUCIÓN m2 1,829.93
05.02 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION MANUAL m3 1,032.61
05.02.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DM<=1KM m3 1,239.14
05.02.03 PERF. Y COMPAC. DE SUB-RASANTE CON PLANCHA COMPACTADORA m2 2,065.23
05.02.04 AFIRMADO, COMPACTADO Y RIEGO E=0.10M. EN DRENAJE PLUVIAL m2 2,065.23
05.03 CONCRETO ARMADO
05.03.01 SOLADO, f'c=100 kg/cm2 (e=2") m2 2,065.23
05.03.02 CONCRETO f'c=210 kg/cm2 m3 860.51
05.03.03 ENCOFRADO Y DESENCOFRADO - CANAL DE DRENAJE PLUVIAL m2 9,293.51
05.03.04 CURADO DE CONCRETO m2 5,163.06
05.03.05 REJILLA METALICA PARA CANALETAS A= 0.60 M m 306.90
05.03.06 JUNTAS ASFALTICAS EN DENAJE PLUVIAL m 7,400.39
06 SARDINELES Y AREAS VERDES
06.01 OBRAS PROVISIONALES
06.01.01 TRAZO Y REPLANTEO DURANTE EL PROCESO DE EJECUCIÓN m2 111.38
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION PARA SARDINELES m3 22.28
06.02.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DM<=1KM m3 26.73
06.03 OBRAS DE CONCRETO
06.03.01 CONCRETO f'c=140 kg/cm2 m3 44.55
06.03.02 ENCOFRADO Y DESENCOFRADO - SARDINEL m2 1,416.25
06.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,427.50
06.03.04 ACABADO EN SARDINEL m2 111.81
06.03.05 CURADO DE CONCRETO m2 857.20
06.03.06 JUNTAS ASFALTICAS EN SARDINELES m 124.50
06.04 SEMBRADO DE GRASS
06.04.01 PREPARACION Y ZARANDEO DE TIERRA DE CHACRA m3 94.57
06.04.02 TRANSPORTE Y COLOCADO DE TIERRA DE CHACRA EN JARDIN m3 94.57
06.04.03 SEMBRADO DE GRAS EN JARDINERIA m2 472.84
06.04.04 RIEGO DE GRAS EN JARDINERIA m2 472.84
06.05 PLANTAS ORNAMENTALES
06.05.01 EXCAVACION DE HOYOS m3 2.12
06.05.02 SEMBRADO DE PLANTAS ORNAMENTALES und 18.00
06.06 GRIFOS PARA RIEGO
06.06.01 INSTALACION DE GRIFOS PARA RIEGO und 12.00
07 EQUIPAMENTO URBANO
07.01 TACHOS DE BASURA
07.01.01 EXCAVACION MANUAL PARA ESTRUCTURAS m3 1.13
07.01.02 CONCRETO f'c=140 kg/cm2 m3 1.13
07.01.03 TACHOS DE BASURA und 18.00
07.02 SEÑALIZACION
07.02.01 SEÑALIZACION EN CRUZES DE VIAS m 350.00
07.02.02 SEÑALES PREVENTIVAS DE TRANSITO R=30 und/dia und 14.00
07.02.03 SEÑALES INFORMATIVAS DE INTERSECCION DE VIAS und 14.00
08 IMPACTO AMBIENTAL
08.01 MEDIDAS DE MITIGACION
08.01.01 RECOLECCION DE RESIDUOS SOLIDOS EN ZONA DE TRABAJO mes 4.00
08.01.02 CONSTRUCCION DE LETRINAS TEMPORALES und 2.00
08.01.03 CONSTRUCCION DE POZO DE RESIDUO SOLIDO m3 12.00
09 FLETE EN OBRA
09.01 ACARREO DE CEMENTO DE ALMACEN A OBRA bol 39,640.46
09.02 ACARREO DE ACERO EN OBRA kg 43,739.67
09.03 ACARREO DE MADERA PARA ENCOFRAR EN OBRA p2 2,093.56
09.04 FLETE TERRESTRE POR TRANSPORTE DE MATERIALES glb 1.00
COSTO DIRECTO
SUBTOTAL
IGV
VALOR REFERENCIAL
EXPEDIENTE TECNICO
COSTO TOTAL
COSTO DIRECTO
OBRAS PRELIMINARES GLB 18,082.40
OBRAS PROVISIONALES GLB 32,564.04
PAVIMENTOS Y CALZADAS GLB 1,400,814.79
VEREDAS Y MARTILLO GLB 250,642.53
DRENAJE PLUVIAL GLB 687,905.73
SARDINELES Y AREAS VERDES GLB 74,131.88
EQUIPAMENTO URBANO GLB 27,067.03
IMPACTO AMBIENTAL GLB 6,282.70
FLETE EN OBRA GLB 208,341.14
PRECIO PARCIAL
18,082.40
705.20 705.20
144.81 17,377.20
32,564.04
14,527.85 14,527.85
0.58 12,453.56
0.26 5,582.63
1,400,814.79
0.68 14,600.72
3.78 43,393.27
8.30 119,101.93
1.58 22,117.60
26.66 74,640.00
6.61 92,529.95
6.23 87,210.53
6.65 93,089.89
20.39 57,085.88
3.39 47,454.85
0.42 5,879.36
40.00 111,988.00
221.18 619,193.41
963.80 12,529.40
250,642.53
0.68 2,969.50
20.66 38,039.19
8.30 18,338.35
4.98 804.87
3.15 13,755.77
5.94 25,939.45
27.08 118,255.92
3.14 13,712.10
22.70 10,928.01
0.17 742.37
2.23 7,157.01
687,905.73
0.68 1,244.35
20.66 21,333.72
8.30 10,284.86
3.15 6,505.47
8.03 16,583.80
19.13 39,507.85
344.72 296,635.01
25.84 240,144.30
0.17 877.72
124.75 38,285.77
2.23 16,502.87
74,131.88
0.68 75.74
20.66 460.30
8.30 221.86
266.36 11,866.34
25.75 36,468.44
4.02 5,738.55
15.05 1,682.74
0.17 145.72
2.23 277.64
19.24 1,819.53
32.83 3,104.73
16.29 7,702.56
0.57 269.52
21.28 45.11
34.03 612.54
303.38 3,640.56
27,067.03
21.28 24.05
266.36 300.99
597.46 10,754.28
5.79 2,026.50
321.36 4,499.04
675.87 9,462.18
6,282.70
1,200.00 4,800.00
617.39 1,234.78
20.66 247.92
208,341.14
0.55 21,802.25
0.05 2,186.98
0.03 62.81
184,289.10 184,289.10
2,705,832.26
243,524.90 Gastos de Supervision (3% CD)
162,349.94 Utilidad (6% CD)
3,111,707.10 Subtotal
560,107.28 IGV (18%)
3,671,814.38 EXPEDIENTE TECNICO
91,795.36 COSTO TOTAL DEL PROYECTO
20,000.00
3,783,609.74
2,705,832.26
2,705,832.26
243,524.90
162,349.94
3,111,707.10
560,107.28
91,795.36
20,000.00
3,783,609.74
2,705,832.25
56892.66
113785.32
2237778.03
402800.05
25000
2665578.08
MITIGACION DE IMPACTO AMBIENTAL
ITEM DESCRIPCION UND METRADO PRECIO PARCIAL
1 COMITE VIAL
01.01 TRABAJOS DE CONFORMACION GLB 0.00 636.00 0.00
01.02 TRABAJOS DE CAPACITACION GLB 0.00 794.00 0.00
COSTO TOTAL 0.00
SENSIBILIZACION
ITEM DESCRIPCION UND METRADO PRECIO PARCIAL
1 CAMPAÑAS DE SENSIBILIZACION
01.01 TRABAJOS DE SENSIBILIZACION SOCIAL GLB 0 0 0.00
01.02 TRABAJOS DE SENSIBILIZACION DE AUTORIDADES GLB 0 0 0.00
COSTO TOTAL 0.00
ALTERNATIVA Nº 01 PRECIOS PRIVADOS AL
COSTO DIRECTO
1 OBRAS PRELIMINARES 18,082.40 1
2 OBRAS PROVISIONALES 32,564.04 2
3 PAVIMENTOS Y CALZADAS 1,382,097.66 3
4 VEREDAS Y MARTILLO 250,642.53 4
5 DRENAJE PLUVIAL 687,905.73 5
6 SARDINELES Y AREAS VERDES 74,131.88 6
7 EQUIPAMENTO URBANO 27,067.03 7
8 IMPACTO AMBIENTAL 6,282.70 8
9 FLETE EN OBRA 208,341.14 9
TOTAL COSTO DIRECTO 2,687,115.14
Gastos generales (9% CD) 9.00% 241,840.36
Utilidad (6% CD) 6.00% 161,226.91
SUBTOTAL 3,090,182.41
IGV 18.00% 556,232.83
VALOR REFERENCIAL 3,646,415.23
Gastos de Supervision (2.5% CTO) 2.50% 91,160.38
EXPEDIENTE TECNICO 20,000.00
COSTO TOTAL EN NUEVOS SOLES 3,757,575.62
ALTERNATIVA Nº 01 PRECIOS SOCIALES
FACTOR DE
PARCIAL
DESCRIPCION PARCIAL S/. CORRECCIO
S/.
N
COSTO DIRECTO
OBRAS PRELIMINARES 18,082.40 0.79 14,285.10
OBRAS PROVISIONALES 32,564.04 0.79 25,725.59
PAVIMENTOS Y CALZADAS 1,382,097.66 0.79 1,091,857.16
VEREDAS Y MARTILLO 250,642.53 0.79 198,007.60
DRENAJE PLUVIAL 687,905.73 0.79 543,445.53
SARDINELES Y AREAS VERDES 74,131.88 0.79 58,564.19
EQUIPAMENTO URBANO 27,067.03 0.79 21,382.96
IMPACTO AMBIENTAL 6,282.70 0.79 4,963.33
FLETE EN OBRA 208,341.14 0.79 164,589.50
Total costo directo 2,687,115.14 2,122,820.94
Gastos generales (9% CD) 9.00% 241,840.36 191,053.88
Utilidad 6.00% 161,226.91 127,369.26
Subtotal 3,090,182.41 2,441,244.08
IGV 18.00% 556,232.83 439,423.94
Costo Total de Obra a Contratar 3,646,415.23 2,880,668.02
Gastos de Supervision (2.5% CTO) 2.50% 91,160.38 72,016.70
EXPEDIENTE TECNICO 20,000.00 0.79 15,800.00
COSTO TOTAL EN NUEVOS SOLES 3,757,575.62 2,968,484.72
12411896.9
4013104.658
3170352.691
ALTERNATIVA Nº 02 PRECIOS PRIVADOS
COSTO DIRECTO
1 OBRAS PRELIMINARES 18,082.40 1
2 OBRAS PROVISIONALES 32,564.04 2
3 PAVIMENTOS Y CALZADAS 1,400,814.79 3
4 VEREDAS Y MARTILLO 250,642.53 4
5 DRENAJE PLUVIAL 687,905.73 5
6 SARDINELES Y AREAS VERDES 74,131.88 6
7 EQUIPAMENTO URBANO 27,067.03 7
8 IMPACTO AMBIENTAL 6,282.70 8
9 FLETE EN OBRA 208,341.14 9
Total costo directo 2,705,832.27
Gastos generales 9.00% 243,524.90
Utilidad 6.00% 162,349.94
Subtotal 3,111,707.10
IGV 18.00% 560,107.28
Costo Total de Obra a Contratar 3,671,814.38
Gastos de Supervision (2.5% CTO) 2.50% 91,795.36
EXPEDIENTE TECNICO 20,000.00
COSTO TOTAL EN NUEVOS SOLES 3,783,609.74
ALTERNATIVA Nº 02 PRECIOS SOCIALES
FACTOR DE
PARCIAL
DESCRIPCION PARCIAL CORRECCIO
S/,
N
COSTO DIRECTO
OBRAS PRELIMINARES 18,082.40 0.79 14,285.10
OBRAS PROVISIONALES 32,564.04 0.79 25,725.59
PAVIMENTOS Y CALZADAS 1,400,814.79 0.79 1,106,643.69
VEREDAS Y MARTILLO 250,642.53 0.79 198,007.60
DRENAJE PLUVIAL 687,905.73 0.79 543,445.53
SARDINELES Y AREAS VERDES 74,131.88 0.79 58,564.19
EQUIPAMENTO URBANO 27,067.03 0.79 21,382.96
IMPACTO AMBIENTAL 6,282.70 0.79 4,963.33
FLETE EN OBRA 208,341.14 0.79 164,589.50
Total costo directo 2,705,832.27 2,137,607.48
Gastos generales 9.00% 243,524.90 192,384.67
Utilidad 6.00% 162,349.94 128,256.45
Subtotal 3,111,707.10 2,458,248.60
IGV 18.00% 560,107.28 442,484.75
Costo Total de Obra a Contratar 3,671,814.38 2,900,733.34
Gastos de Supervision (2.5% CTO) 2.50% 91,795.36 72,518.33
EXPEDIENTE TECNICO 20,000.00 0.79 15,800.00
COSTO TOTAL EN NUEVOS SOLES 3,783,609.73 2,989,051.68
MANTENIMIENTO RUTINARIO SIN PROYECTO
PISTAS
1 Riego M2 1,399.85 1.30 1,819.80 0.75 1,364.85
2 Limpieza general * M2 1,399.85 2.00 2,799.70 0.75 2,099.77
3 Tapado de huecos M2 699.92 12.00 8,399.09 0.75 6,299.32
VEREDAS
4 Riego M2 436.69 1.30 567.70 0.75 425.77
5 Limpieza general * M2 436.69 2.00 873.38 0.75 655.04
6 Tapado de huecos M2 218.35 12.00 2,620.15 0.75 1,965.11
AREAS VERDES
7 Reforestacion Glb. 1 250.00 250.00 0.75 187.50
COSTOS FACT.
DESCRIPCIÓN UNID. CANT. PRECIO
PRIVADOS CORREC.
1.0 Superficie de rodadura 31,293.60
1.1 Limpieza General m2 13,998.48 1.40 19,597.87 0.75
1.2 Cambio parcial de afirmado m2 699.92 16.71 11,695.73 0.75
2.0 Veredas 39,118.74
2.1 Reparación parcial de áreas de vereda m2 436.69 85.00 37,118.74 0.90
2.2 Limpieza de malezas y otros m 200.00 10.00 2,000.00 0.75
3.0 Areas Verdes 1,532.10
3.1 Limpieza General m2 472.84 2.50 1,182.10 0.75
3.2 Reforestacion Glb. 1.00 200.00 200.00 0.75
3.3 Insecticidas y curado en general Glb. 1.00 150.00 150.00 0.75
4.0 Servicios 3,000.00
4.1 Elaboración de expediente técnico Glb. 1.00 3,000.00 3,000.00 0.75
COSTO TOTAL 74,944.44
COSTOS FACT.
DESCRIPCIÓN UND CANT PRECIO
PRIVADOS CORREC.
1 PISTAS 16,800.52
1.1 Limpieza General m2 2,799.70 2.00 5,599.39 0.75
1.2 Pintura de pavimento m. 35.00 25.00 875.00 0.75
1.3 Limpieza y reparación de drenaje m. 172.10 60.00 10,326.13 0.75
2 VEREDAS 33,546.29
2.1 Reparación parcial de losas m2 436.69 68.00 29,694.99 0.75
2.2 Reparación de juntas de dilatación m. 320.94 12.00 3,851.30 0.75
3 AREAS VERDES 1,195.68
3.1 Limpieza General m2 472.84 2.00 945.68 0.75
3.2 Reforestacion Glb. 1.00 200.00 200.00 0.75
3.3 Insecticidas y curado en general Glb. 1.00 50.00 50.00 0.75
COSTO TOTAL 51,542.49
Costos de operación 10% 5154.25
COSTO TOTAL DE OPERACIÓN Y MANTENIMIENTO 56,696.74
COSTOS
DESCRIPCIÓN UND CANT PRECIO
SOCIALES
12,600.39 1.0 Pistas
4,199.54 1.1 Limpieza General m2 13,998.48 2.00
656.25 1.2 Pintura de pavimento m. 350.00 25.00
7,744.59 1.3 Cambio parcial de pavimento m2 2,799.70 80.00
25,159.72 1.4 Reparacion de juntas de Dilatación m 993.11 12.00
22,271.24 1.5 Limpieza y reparación de drenaje m. 172.10 60.00
2,888.48 2.0 Veredas
896.76 2.1 Reración parcial de losas m2 436.69 68.00
709.26 2.2 Reparación de juntas de dilatación m. 320.94 12.00
150.00 3.0 Areas Verdes (Arborización)
37.50 3.1 Limpieza General m2 472.84 2.00
38,656.87 3.2 Reforestacion Glb. 1.00 200.00
3865.69 3.3 Insecticidas y curado en general Glb. 1.00 50.00
42,522.55 4.0 Servicios
4.1 Elaboración de expediente técnico Glb. 1.00 5,000.00
COSTO TOTAL
1.0 Pistas
1.1 Limpieza General m2 13,998.48 2.00
1.2 Pintura de pavimento m. 350.00 25.00
1.3 Cambio parcial de pavimento m2 2,799.70 80.00
1.4 Reparacion de juntas de Dilatación m 993.11 12.00
1.5 Limpieza y reparación de drenaje m. 172.10 60.00
2.0 Veredas
2.1 Reración parcial de losas m2 436.69 68.00
2.2 Reparación de juntas de dilatación m. 320.94 12.00
3.0 Areas Verdes (Arborización)
3.1 Limpieza General m2 472.84 2.00
3.2 Reforestacion Glb. 1.00 200.00
3.3 Insecticidas y curado en general Glb. 1.00 50.00
4.0 Servicios
4.1 Elaboración de expediente técnico Glb. 1.00 5,000.00
COSTO TOTAL
ODICO ALTERNATIVA 1
TIVA 1
COSTOS
PRIVADOS
282,966.04
27,996.96
8,750.00
223,975.68
11,917.27
10,326.13
33,546.29
29,694.99
3,851.30
3,145.68
945.68
1,200.00
1,000.00
5,000.00
5,000.00
324,658.01
MANTENIMIENTO RUTINARIO ALTERNATIVA 2
COSTOS
DESCRIPCIÓN UNID. CANT. PRECIO
PRIVADOS
1 PISTAS 107,790.64
1.1 Limpieza General m2 2,799.70 2.00 5,599.39
1.2 Pintura de pavimento m. 35.00 25.00 875.00
1.3 Limpieza y reparación de drenaje m. 172.10 60.00 10,326.13
1.4 Rellenado y reparacion del pavimento con asfalto m2 1,399.85 65.00 90,990.12
2 VEREDAS 33,546.29
2.1 Reparación parcial de losas m2 436.69 68.00 29,694.99
2.2 Reparación de juntas de dilatación m. 320.94 12.00 3,851.30
3 AREAS VERDES 1,195.68
3.1 Limpieza General m2 472.84 2.00 945.68
3.2 Reforestacion Glb. 1.00 200.00 200.00
3.3 Insecticidas y curado en general Glb. 1.00 50.00 50.00
COSTO TOTAL 142,532.61
Costos de operación 10% 14253.26
COSTO TOTAL DE OPERACIÓN Y MANTENIMIENTO 156,785.87
FACT. COSTOS
DESCRIPCIÓN
CORREC. SOCIALES
80,842.98 1.0 Pistas
0.75 4,199.54 1.1 Limpieza General
0.75 656.25 1.2 Pintura de pavimento
0.75 7,744.59 1.3 Cambio parcial de pavimento
0.75 68,242.59 1.4 Limpieza y reparación de drenaje
25,159.72 2.0 Veredas
0.75 22,271.24 2.1 Reración parcial de losas
0.75 2,888.48 2.2 Reparación de juntas de dilatación
896.76 3.0 Areas Verdes (Arborización)
0.75 709.26 3.1 Limpieza General
0.75 150.00 3.2 Reforestacion
0.75 37.50 3.3 Insecticidas y curado en general
106,899.46 4.0 Servicios
10689.95 4.1 Elaboración de expediente técnico
117,589.40 COSTO TOTAL
DESCRIPCIÓN
1.0 Pistas
1.1 Limpieza General
1.2 Pintura de pavimento
1.3 Cambio parcial de pavimento
1.4 Limpieza y reparación de drenaje
2.0 Veredas
2.1 Reración parcial de losas
2.2 Reparación de juntas de dilatación
3.0 Areas Verdes (Arborización)
3.1 Limpieza General
3.2 Reforestacion
3.3 Insecticidas y curado en general
4.0 Servicios
4.1 Elaboración de expediente técnico
COSTO TOTAL
IENTO PERIODICO ALTERNATIVA 2
DICO ALTERNATIVA 2
COSTOS
UNID. CANT. PRECIO
PRIVADOS
383,897.12
m2 13,998.48 2.00 27,996.96
m. 350.00 25.00 8,750.00
m2 5,599.39 60.00 335,963.52
m. 172.10 65.00 11,186.64
68,208.03
m2 436.69 68.00 29,694.99
m. 3,209.42 12.00 38,513.04
1,195.68
m2 472.84 2.00 945.68
Glb. 1.00 200.00 200.00
Glb. 1.00 50.00 50.00
5,000.00
Glb. 1.00 5,000.00 5,000.00
458,300.82
COSTOS INCREMENTALES ALTERNATIVA 1 - PRECIOS
AÑ
RUBRO
0 1 2 3 4 5 6 7 8
COSTO EN LA SITUACION CON PROYECTO 3,757,575.65 56,696.74 56,696.74 56,696.74 56,696.74 329,812.26 56,696.74 56,696.74 56,696.74
I. INVERSION 3,757,575.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTO DIRECTO 2,687,115.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 OBRAS PRELIMINARES 18,082.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 OBRAS PROVISIONALES 32,564.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 PAVIMENTOS Y CALZADAS 1,382,097.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 VEREDAS Y MARTILLO 250,642.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 DRENAJE PLUVIAL 687,905.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 SARDINELES Y AREAS VERDES 74,131.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 EQUIPAMENTO URBANO 27,067.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 IMPACTO AMBIENTAL 6,282.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 FLETE EN OBRA 208,341.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTOS INDIRECTOS 1,070,460.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 EXPEDIENTE TECNICO 20,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Gastos generales (9% CD) 241,840.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Gastos de Supervision (2.5% CTO) 91,160.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Utilidad (6% CD) 161,226.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 IGV 556,232.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
II. POST INVERSION 0.00 56,696.74 56,696.74 56,696.74 56,696.74 329,812.26 56,696.74 56,696.74 56,696.74
1 OPERACIÓN 0.00 5,154.25 5,154.25 5,154.25 5,154.25 5,154.25 5,154.25 5,154.25 5,154.25
2 MANTENIMIENTO 0.00 51,542.49 51,542.49 51,542.49 51,542.49 324,658.01 51,542.49 51,542.49 51,542.49
COSTO EN LA SITUACION SIN PROYECTO 17,329.81 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81
III. OPERACIÓN Y MANTENIMIENTO SIN PROYECTO 17,329.81 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81
1 OPERACIÓN 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 MANTENIMIENTO 17,329.81 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81
IV. COSTOS INCREMENTALES I + II - III 3,740,245.84 39,366.93 39,366.93 -18,247.70 39,366.93 312,482.45 -18,247.70 39,366.93 39,366.93
1 OBRAS PRELIMINARES 18,082.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 OBRAS PROVISIONALES 32,564.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 PAVIMENTOS Y CALZADAS 1,400,814.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 VEREDAS Y MARTILLO 250,642.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 DRENAJE PLUVIAL 687,905.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 SARDINELES Y AREAS VERDES 74,131.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 EQUIPAMENTO URBANO 27,067.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 IMPACTO AMBIENTAL 6,282.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 FLETE EN OBRA 208,341.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTOS INDIRECTOS 1,077,777.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 EXPEDIENTE TECNICO 20,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Gastos generales 243,524.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Gastos de Supervision (2.5% CTO) 91,795.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Utilidad 162,349.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 IGV 560,107.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
II. POST INVERSION 0.00 156,785.87 156,785.87 156,785.87 472,554.09 156,785.87 156,785.87 156,785.87 472,554.09
1 OPERACIÓN 0.00 14,253.26 14,253.26 14,253.26 14,253.26 14,253.26 14,253.26 14,253.26 14,253.26
2 MANTENIMIENTO 0.00 142,532.61 142,532.61 142,532.61 458,300.82 142,532.61 142,532.61 142,532.61 458,300.82
COSTO EN LA SITUACION SIN PROYECTO 17,329.81 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81
III. OPERACIÓN Y MANTENIMIENTO SIN PROYECTO 17,329.81 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81
1 OPERACIÓN 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 MANTENIMIENTO 17,329.81 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81
IV. COSTOS INCREMENTALES I + II - III 3,766,279.99 139,456.06 139,456.06 81,841.43 455,224.27 139,456.06 81,841.43 139,456.06 455,224.27
LTERNATIVA 1 - PRECIOS PRIVADOS
AÑOS
9 10 11 12 13 14 15 16 17 18 19 20
56,696.74 329,812.26 56,696.74 56,696.74 56,696.74 56,696.74 329,812.26 56,696.74 56,696.74 56,696.74 56,696.74 329,812.26 COSTOS EN SITUACI
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 I. INVERSIÓN
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 COSTO DIRECTO
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 COSTOS INDIRECTOS
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5
56,696.74 329,812.26 56,696.74 56,696.74 56,696.74 56,696.74 329,812.26 56,696.74 56,696.74 56,696.74 56,696.74 329,812.26 II. FASE DE POST INV
5,154.25 5,154.25 5,154.25 5,154.25 5,154.25 5,154.25 5,154.25 5,154.25 5,154.25 5,154.25 5,154.25 5,154.25 1
51,542.49 324,658.01 51,542.49 51,542.49 51,542.49 51,542.49 324,658.01 51,542.49 51,542.49 51,542.49 51,542.49 324,658.01 2
74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 COSTOS EN SITUACI
74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 III. OPERACIÓN Y MA
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1
74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 2
-18,247.70 312,482.45 39,366.93 -18,247.70 39,366.93 39,366.93 254,867.82 39,366.93 39,366.93 -18,247.70 39,366.93 312,482.45 IV. COSTOS INCREME
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 COSTOS INDIRECTOS
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5
156,785.87 156,785.87 156,785.87 472,554.09 156,785.87 156,785.87 156,785.87 472,554.09 156,785.87 156,785.87 156,785.87 472,554.09 II. FASE DE POST INV
14,253.26 14,253.26 14,253.26 14,253.26 14,253.26 14,253.26 14,253.26 14,253.26 14,253.26 14,253.26 14,253.26 14,253.26 1
142,532.61 142,532.61 142,532.61 458,300.82 142,532.61 142,532.61 142,532.61 458,300.82 142,532.61 142,532.61 142,532.61 458,300.82 1
74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 COSTOS EN SITUACI
74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 III. OPERACIÓN Y MA
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1
74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 74,944.44 17,329.81 17,329.81 2
81,841.43 139,456.06 139,456.06 397,609.65 139,456.06 139,456.06 81,841.43 455,224.27 139,456.06 81,841.43 139,456.06 455,224.27 IV. COSTOS INCREME
COSTOS INCREMENTALES ALTERNATIVA 1 - PRECIOS SOCIALES
AÑOS
RUBRO
0 1 2 3 4 5 6 7 8 9
COSTOS EN SITUACIÓN CON PROYECTO 2,968,484.72 42,522.55 42,522.55 42,522.55 42,522.55 247,359.19 42,522.55 42,522.55 42,522.55 42,522.55
I. INVERSIÓN 2,968,484.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTO DIRECTO 2,122,820.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
OBRAS PRELIMINARES 14,285.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
OBRAS PROVISIONALES 25,725.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PAVIMENTOS Y CALZADAS 1,091,857.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
VEREDAS Y MARTILLO 198,007.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DRENAJE PLUVIAL 543,445.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SARDINELES Y AREAS VERDES 58,564.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EQUIPAMENTO URBANO 21,382.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
IMPACTO AMBIENTAL 4,963.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
FLETE EN OBRA 164,589.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTOS INDIRECTOS 845,663.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EXPEDIENTE TECNICO 15,800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gastos generales (9% CD) 191,053.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gastos de Supervision (2.5% CTO) 72,016.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Utilidad (6% CD) 127,369.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
IGV 439,423.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
II. FASE DE POST INVERSIÓN 0.00 42,522.55 42,522.55 42,522.55 42,522.55 247,359.19 42,522.55 42,522.55 42,522.55 42,522.55
OPERACIÓN 0.00 3,865.69 3,865.69 3,865.69 3,865.69 3,865.69 3,865.69 3,865.69 3,865.69 3,865.69
MANTENIMIENTO 0.00 38,656.87 38,656.87 38,656.87 38,656.87 243,493.51 38,656.87 38,656.87 38,656.87 38,656.87
COSTOS EN SITUACIÓN SIN PROYECTO 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36
III. OPERACIÓN Y MANTENIMIENTO SIN PROYECTO 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36
OPERACIÓN 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MANTENIMIENTO 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36
IV. COSTOS INCREMENTALES I + II - III 2,955,487.36 29,525.19 29,525.19 29,525.19 29,525.19 234,361.83 29,525.19 29,525.19 29,525.19 29,525.19
OBRAS PRELIMINARES 14,285.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
OBRAS PROVISIONALES 25,725.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PAVIMENTOS Y CALZADAS 1,106,643.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
VEREDAS Y MARTILLO 198,007.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DRENAJE PLUVIAL 543,445.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SARDINELES Y AREAS VERDES 58,564.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EQUIPAMENTO URBANO 21,382.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
IMPACTO AMBIENTAL 4,963.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
FLETE EN OBRA 164,589.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTOS INDIRECTOS 851,444.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EXPEDIENTE TECNICO 15,800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gastos generales 192,384.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gastos de Supervision (2.5% CTO) 72,518.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Utilidad 128,256.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
IGV 442,484.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
II. FASE DE POST INVERSIÓN 0.00 117,589.40 117,589.40 117,589.40 354,415.56 117,589.40 117,589.40 117,589.40 354,415.56 117,589.40
OPERACIÓN 0.00 10,689.95 10,689.95 10,689.95 10,689.95 10,689.95 10,689.95 10,689.95 10,689.95 10,689.95
MANTENIMIENTO 0.00 106,899.46 106,899.46 106,899.46 343,725.62 106,899.46 106,899.46 106,899.46 343,725.62 106,899.46
COSTOS EN SITUACIÓN SIN PROYECTO 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36
III. OPERACIÓN Y MANTENIMIENTO SIN PROYECTO 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36
OPERACIÓN 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MANTENIMIENTO 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36
IV. COSTOS INCREMENTALES I + II - III 2,976,054.32 104,592.04 104,592.04 104,592.04 341,418.20 104,592.04 104,592.04 104,592.04 341,418.20 104,592.04
A 1 - PRECIOS SOCIALES
AÑOS
10 11 12 13 14 15 16 17 18 19 20
247,359.19 42,522.55 42,522.55 42,522.55 42,522.55 247,359.19 42,522.55 42,522.55 42,522.55 42,522.55 247,359.19
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
247,359.19 42,522.55 42,522.55 42,522.55 42,522.55 247,359.19 42,522.55 42,522.55 42,522.55 42,522.55 247,359.19
3,865.69 3,865.69 3,865.69 3,865.69 3,865.69 3,865.69 3,865.69 3,865.69 3,865.69 3,865.69 3,865.69
243,493.51 38,656.87 38,656.87 38,656.87 38,656.87 243,493.51 38,656.87 38,656.87 38,656.87 38,656.87 243,493.51
12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36
12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36
234,361.83 29,525.19 29,525.19 29,525.19 29,525.19 234,361.83 29,525.19 29,525.19 29,525.19 29,525.19 234,361.83
Nº 02 A PRECIOS SOCIALES
AÑOS
10 11 12 13 14 15 16 17 18 19 20
117,589.40 117,589.40 354,415.56 117,589.40 117,589.40 117,589.40 354,415.56 117,589.40 117,589.40 117,589.40 354,415.56
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
117,589.40 117,589.40 354,415.56 117,589.40 117,589.40 117,589.40 354,415.56 117,589.40 117,589.40 117,589.40 354,415.56
10,689.95 10,689.95 10,689.95 10,689.95 10,689.95 10,689.95 10,689.95 10,689.95 10,689.95 10,689.95 10,689.95
106,899.46 106,899.46 343,725.62 106,899.46 106,899.46 106,899.46 343,725.62 106,899.46 106,899.46 106,899.46 343,725.62
12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36
12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36 12,997.36
104,592.04 104,592.04 341,418.20 104,592.04 104,592.04 104,592.04 341,418.20 104,592.04 104,592.04 104,592.04 341,418.20
0 1 2 3 4 5
II. POST INVERSION 0.00 56,696.74 56,696.74 56,696.74 56,696.74 329,812.26
1 OPERACIÓN 0.00 5,154.25 5,154.25 5,154.25 5,154.25 5,154.25
2 MANTENIMIENTO 0.00 51,542.49 51,542.49 51,542.49 51,542.49 324,658.01
Años (Nuevos So
COSTOS
2012 2013 2014 2015 2016
Operación 0.00 0.00 0.00 0.00 0.00
Sin PIP
Mantenimiento 17,329.81 17,329.81 17,329.81 74,944.44 17,329.81
Operación 0.00 5,154.25 5,154.25 5,154.25 5,154.25
Con PIP
Mantenimiento 0.00 51,542.49 51,542.49 51,542.49 51,542.49
AUTO CAMTA BUS MED BUS GRAN CAM 2E CAM 3E ARTICULADO COV
PROYECCIÓN DE TRAFI
TIPO DE
2012 2013 2014 2015 2016 2017
VEHICULO
Auto 39 40 41 42 44
Camioneta 57 59 60 61 63
Bus Mediano 0 0 0 0 0
Bus Grande 0 0 0 0 0
Camion 2 Ejes 4 4 4 5 5
Camion 3 Ejes 3 3 3 3 3
Articulado 0 0 0 0 0
SUB TOTAL 0 103 106 109 112 115
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
297 305 312 320 328 336 345 353 362 371 380 390 399 409
431 441 452 464 475 487 499 511 524 537 551 564 578 593
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
35 37 39 42 44 47 49 52 55 58 62 65 69 73
24 25 26 28 29 31 33 35 37 39 41 44 46 49
0 0 0 0 0 0 0 0 0 0 0 0 0 0
787 808 830 853 877 901 926 952 978 1,006 1,034 1,063 1,093 1,124
905 929 955 981 1,008 1,036 1,065 1,094 1,125 1,157 1,189 1,223 1,257 1,293
DISTANCIA KM
TIPO DE
2032 1.721 2012 2013 2014
VEHICULO
419 Auto 35,104 35,978
608 Camioneta 33,249 34,077
0 Bus Mediano 0 0
0 Bus Grande 0 0
77 Camion 2 Ejes 16,939 17,922
52 Camion 3 Ejes 11,418 12,080
0 Articulado 0 0
1,156 SUB TOTAL 96,711 100,057
TIPO DE
2032 2012 2013 2014
VEHICULO
63 Auto 2,633 2,698
91 Camioneta 2,494 2,556
0 Bus Mediano 0 0
0 Bus Grande 0 0
12 Camion 2 Ejes 1,270 1,344
8 Camion 3 Ejes 856 906
0 Articulado 0 0
173 SUB TOTAL 7,253 7,504
CALCULO DE IMDa
TIPO DE
Lunes Martes Miércoles Jueves Viernes Sábado Domingo TOTAL IMDs FC
VEHICULO
Moto lineal 70 65 72 74 73 75 78 507 72 1.0117
Mototaxi-Motocar 35 30 32 34 35 38 38 242 35 1.0125
70 35
65 30
72 32
74 34
73 35
75 38
78 38
TORES DE CORRECCION TASA DE CRECIMIENTO TRAFICO GENERADO
IMDa
73
35
PROYECCION DEL TRAFICO NORMAL VEHICULO MOTORIZADO (Veh/día)
Tasa de
TIPO DE VEHICULO 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Crec.
Moto lineal 2.49% 73 75 77 79 81 83 85 87 89 91 94 96 98 101 103
Mototaxi-Motocar 2.49% 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49
SUB TOTAL 108 111 114 117 119 122 125 129 132 135 138 142 145 149 153
106 109 111 114 117 120 Sin Proyecto Sierra, Ondulada, Afirmada en mal estado
51 52 53 54 56 57 Con Proyecto Sierra, Ondulada, Asfaltada en buen estado
157 160 164 169 173 177
día)
2027 2028 2029 2030 2031 2032
16 16 17 17 18 18
8 8 8 8 8 9
23 24 25 25 26 27
(Veh/día)
58 60 61 63 64 66
180 185 189 194 199 204
COSTO DE OPERACIÓN VEHICULAR (US$ x Km) SEGÚN TIPO DE VEHICULO
REGION TOPOG. SUPERFICIE ESTADO Moto DISTANCIA KM
Sierra O AFI M 0.55 1.721
Sierra O ASF B 0.28
Benef. Tráfico normal 0.27
Benef. Tráfico generado 0.14
0.1
Debido a que no se cuenta con informacion referente al COV por vehiculo motorizado,
se asumira que el COV por vehiculo motorizado es la tercera parte de un vehiculo
ligero, en este caso de un auto
DIAS AL AÑO TIPO DE VEHICULO 2012 2013 2014 2015 2016 2017
PR
TIPO DE VEHICULO 2012 2013 2014 2015 2016 2017
Moto lineal 318 326 334 343 351
Mototaxi-Motocar 152 156 160 164 168
SUB TOTAL 471 482 494 507 519
TOTAL 6,745 6,913 7,085 7,261 7,442
CAMBIO DEL
DÓLAR
2.83 B
TIPO DE VEHICULO 2012 2013 2014 2015 2016 2017
Moto lineal 12,917 13,239 13,568 13,906 14,252
Mototaxi-Motocar 6,170 6,324 6,481 6,643 6,808
TOTAL 19,087 19,562 20,050 20,549 21,060
PROYECCION DE BENEFICIOS DEL TRAFICO NORMAL (US$)
1553994.7139
INVERSION ( + 20%)
INDICADORES DE RENTABILIDAD ALTERNATIVA 1
COSTO
AÑO INVERSION BENEFICIOS FLUJO NETO TD (9%) AÑO
O&M
0 2012 3,562,181.66 -3,562,181.66 -3,562,181.66 0
1 2013 29,525.19 313,305.06 283,779.87 260,348.50 1
2 2014 29,525.19 323,961.91 294,436.71 247,821.49 2
3 2015 29,525.19 335,049.73 305,524.53 235,921.00 3
4 2016 29,525.19 346,588.86 317,063.67 224,615.90 4
5 2017 234,361.83 358,600.72 124,238.88 80,746.75 5
6 2018 29,525.19 371,107.81 341,582.61 203,674.55 6
BENEFICIOS ( - 10%)
INDICADORES DE RENTABILIDAD ALTERNATIVA 1
COSTO
AÑO INVERSION BENEFICIOS FLUJO NETO TD (9%) AÑO
O&M
0 2012 2,968,484.72 -2,968,484.72 -2,968,484.72 0
1 2013 29,525.19 281,974.55 252,449.36 231,604.92 1
2 2014 29,525.19 291,565.71 262,040.52 220,554.26 2
3 2015 29,525.19 301,544.75 272,019.56 210,049.01 3
4 2016 29,525.19 311,929.98 282,404.78 200,062.67 4
5 2017 234,361.83 322,740.65 88,378.81 57,440.16 5
6 2018 29,525.19 333,997.03 304,471.83 181,546.61 6
7 2019 29,525.19 345,720.46 316,195.27 172,969.64 7
8 2020 29,525.19 357,933.41 328,408.22 164,817.01 8
9 2021 29,525.19 370,659.52 341,134.33 157,067.72 9
10 2022 234,361.83 383,923.70 149,561.87 63,176.55 10
11 2023 29,525.19 397,752.18 368,226.98 142,700.05 11
12 2024 29,525.19 412,172.57 382,647.37 136,044.43 12
13 2025 29,525.19 427,213.98 397,688.78 129,717.59 13
14 2026 29,525.19 442,907.06 413,381.86 123,703.06 14
15 2027 234,361.83 459,284.11 224,922.28 61,749.72 15
16 2028 29,525.19 476,379.18 446,853.99 112,549.01 16
17 2029 29,525.19 494,228.13 464,702.94 107,380.38 17
18 2030 29,525.19 512,868.77 483,343.58 102,465.81 18
19 2031 29,525.19 532,340.96 502,815.76 97,792.47 19
20 2032 234,361.83 552,686.70 318,324.87 56,798.99 20
VANS -238,294.65
TIR 7.99%
BENEFICIOS ( - 10%)
INDICADORES DE RENTABILIDAD ALTERNATIVA 1
COSTOS COSTOS
INVERSION BENEFICIOS
ALTERNATIVA (+10%) (+20%)
2 BENEFICIOS BENEFICIOS
(+20%) (-10%)
(-10%) (-20%)
VAN -1,334,201.70 -1,083,841.27 -1,523,440.57 -2,687,274.91
TIR 4.03% 4.16% 2.58% -1.61%
INDICADORES DE RENTABILIDAD ALTERNATIVA 1
0.5070
ATIVA 1 INDICADORES
15,884.57
0.01
INDICADORES DE RENTABILIDAD ALTERNATIVA 2
51
ANALISIS DE SENSIBILIDAD ALTERNATIVA Nº 1
Encuesta a la población
Financiamiento suficiente y
Inventario vial
oportuno
Financiamiento suficiente y
Inventario vial
oportuno
Financiamiento suficiente y
Inventario vial
oportuno
Disponibilidad de personal y
Expediente técnico capacidad técnica de
aprobado profesionales de la
Municipalidad
Cuaderno de obra
Informe de avance
mensual Participación de los pobladores S/. 2,840,575.64
Informe de impacto
ambiental
S/. 8,682.70
S/. 256,433.25
S/. 96,661.09
S/. 170,955.50
S/. 589,796.48
S/. 4,013,104.66
CRONOGRAMA DE INVERSION SEGÚN METAS
Semestre(Nuevos Soles)
3er 1er
METAS
Semestre Semestre
2011 2012
EXPEDIENTE TECNICO 30,000.00
COSTO DIRECTO 0.00
OBRAS PRELIMINARES 5,424.72
VEREDAS Y MARTILLO
DRENAJE PLUVIAL
SARDINELES Y AREAS VERDES
EQUIPAMENTO URBANO 8,120.11
IMPACTO AMBIENTAL
FLETE EN OBRA
#REF!
#REF! #REF!
Gastos generales (7.00%) #REF!
Supervisión (4.00%) #REF!
Utilidad (6.00%) #REF!
IGV (18%) #REF!
TOTAL POR PERIODO #REF!
Semestre(Nuevos Soles)
3er 1er
METAS
Semestre Semestre
2011 2012
EXPEDIENTE TECNICO 100.00%
COSTO DIRECTO 100.00%
OBRAS PRELIMINARES 30.00%
VEREDAS Y MARTILLO
DRENAJE PLUVIAL
SARDINELES Y AREAS VERDES
EQUIPAMENTO URBANO 30.00%
IMPACTO AMBIENTAL
FLETE EN OBRA
#REF!
#REF! 100.00%
Gastos generales (7.00%) 20.00%
Supervisión (4.00%) 20.00%
Utilidad (6.00%) 20.00%
IGV (18%) 20.00%
TOTAL POR PERIODO 20.00%
METAS
Semestre(Nuevos Soles)
2do
Semestre Total por meta
2012
AS
Semestre(Nuevos Soles)
2do
Semestre Total por meta
2012
100.00%
70.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
70.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00%
80.00% 100.00%
80.00% 100.00%
80.00% 100.00%
80.00% 100.00%
80.00% 100.00%
715 1482 2.07272727
273 431 1.57875458
148 234
332 524
141 223
102 161
70 111
58 92
78 123
65 103
82 129
80 126
84 133
43 68
172 272
116 183
55 87
97 153
139 219
49 77
159 251
562 887