Documentos de Académico
Documentos de Profesional
Documentos de Cultura
: MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-
PROY.
PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
: MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-
META
PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
PRESUPUESTO APROBADO
ESPECIF.
DESCRIPCION
GASTO COSTO DIRECTO GASTOS GASTOS DE
UTILIDAD SUB TOTAL IGV TOTAL
S/IGV GENERALES SUPERVISION
2.6.2.3.4.3 COSTO DE CONST.POR CONTRATA - PERSONAL 5,802,285.41 0.00 406,159.98 6,208,445.39 1,117,520.17 0.00 7,325,965.56
2.6.2.3.4.4 COSTO DE CONSTRUC.POR CONTRATA - BIENES 4,466,793.76 #NAME? 312,675.56 #NAME? #NAME? 3,374.47 #NAME?
2.6.2.3.4.5 COSTO DE CONST.POR CONTRATA - SERVICIOS 1,388,176.01 #NAME? 97,172.32 #NAME? #NAME? 53,737.61 #NAME?
PROYECTO: MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-
PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y
CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
PROYECTO: MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-
PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-
CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
COMPONENTE META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-
PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-
CHICURO DEL CP. PICHOS
#REF!
META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
MANO DE OBRA
147010002 OPERARIO hh 37,703.65 21.01
147010003 OFICIAL hh 50,052.36 17.03
147010004 PEON hh 271,215.92 15.33
MATERIALES
0201800004 LUBRICANTE gln 172.6535 33.90
0202010002 CLAVOS PARA MADERA C/C 2 1/2" kg 639.6275 3.39
0202010005 CLAVOS PARA MADERA C/C 3" kg 1,168.7695 3.39
0202010007 CLAVOS PARA MADERA C/C 4" kg 563.0179 3.39
0202040009 ALAMBRE NEGRO N°16 kg 3,048.9923 3.39
0202040010 ALAMBRE NEGRO N°8 kg 1,832.3490 3.39
0202100010 PERNOS HEXAGONALES DE 3/4" x 3 1/2" pza 27.0000 5.08
0202100053 PERNO HEXAGONAL P/BRIDA DE 6" INC.TUERCA und 70.0000 12.80
0202130010 POLEA METALICA DE DIAMETRO 3" X 1/2" und 2.0000 23.93
0202510100 PERNOS CON TUERCAS 1" X 1 1/4" und 2.0000 0.59
0202510101 PERNOS PARA GRAPAS 1/2" x 2 " und 2.0000 5.76
0202910002 GRAPAS 1/2" x 2" und 2.0000 5.51
0202970002 ACERO DE REFUERZO FY=4200 GRADO 60 kg 91,469.7315 3.20
0204000000 ARENA FINA m3 143.5827 110.17
0205000004 PIEDRA CHANCADA DE 3/4" m3 1,815.8491 110.17
0205010000 AFIRMADO PREPARADO m3 136.8288 84.75
0205010004 ARENA GRUESA m3 1,343.9271 101.69
0205020021 PIEDRA GRANDE m3 303.2026 80.51
0211010101 CANASTILLA PVC SAP DE 160mm und 43.0000 49.80
0211010102 CANASTILLA PVC SAP DE 110mm und 23.0000 19.60
0211010103 CANASTILLA PVC SAP DE 90mm und 23.0000 14.90
0211010104 CANASTILLA PVC SAP DE 75mm und 29.0000 11.60
0211010105 CANASTILLA PVC SAP DE 63mm und 45.0000 8.30
0211010106 CANASTILLA PVC SAP DE 50mm und 18.0000 5.80
0213030013 DINATRID (GEL) gln 178.1514 122.88
0221000000 CEMENTO PORTLAND TIPO I (42.5KG) BOL 24,009.1299 20.00
0226270002 REJILLA METALICA (0.56x0.70) und 10.0000 156.80
0226280001 TAPA METALICA (0.60x0.60M) und 10.0000 237.30
0227000001 MECHA NARANJA m 10,956.5762 1.27
0227020011 FULMINANTE und 10,956.5762 0.93
0228000022 DINAMITA kg 12,041.9931 3.19
0229030002 YESO EN BOLSAS DE 25 KG. BOL 117.0100 6.36
0229070142 CANASTILLA DE BRONCE 110MM und 11.0000 581.40
0229070143 ACOPLE DE MANGUERA A MANGUERA HDPE DE 1" und 150.0000 7.10
0229120005 WATER STOP PVC DE 6" m 173.9850 12.71
0229550092 ELECTRODOS (SOLDADURA CELLOCORD 3/16") kg 559.7000 12.71
0230010102 PEGAMENTO PVC DE ALTA PRESION gln 16.9175 84.75
0230020096 CABLE DE ACERO DE Ø 1/2" TIPO BOA m 18.5400 21.19
0230020097 CABLE DE ACERO DE Ø 1/4" TIPO BOA m 16.4800 15.25
0230080010 BARRENO 5' X 1/8" und 409.5916 381.16
0230240011 CHEMALAC Y DISOLVENTE gln 153.5103 177.97
Precios y cantidades de recursos requeridos por tipo
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
EQUIPOS
0337010001 HERRAMIENTAS MANUALES %MO 1.00 249,095.61
0348110004 VOLQUETE DE 10 M3 hm 40.8167 101.69
0348210005 MOTOSOLDADORA DE 250 AMPERIOS hm 746.3039 33.90
0348330091 BALDE DE PRUEBA (TUBERIA) hm 1,119.8534 12.71
0348560005 MEZCLADORA DE CONCRETO DE 9-11P3 hm 1,143.0550 8.47
0348560006 VIBRADOR DE CONCRETO 4 HP 1.50" hm 1,235.9341 8.47
0348970004 TECLE DE 4 TON. hm 9.0678 12.71
0349030004 COMPACTADOR VIBR. TIPO PLANCHA 7 HP hm 864.5268 8.47
0349030074 VIBROPISON 4.1 HP hm 15,575.0792 10.17
0349040006 CARGADOR RETROEXCAVADOR 62 HP 1 YD3 hm 1,005.3221 135.59
0349040035 TRACTOR DE ORUGAS DE 270-295 HP hm 1.6752 271.19
0349040097 MOVILIZACION EQUIPO PESADO und 3.0000 1,677.97
0349060059 PIONJER hm 19,548.5222 25.42
0349080012 ZARANDA MECANICA hm 1,376.3948 2.24
SUBCONTRATOS
0401010003 TALLER DE CAPACITACION EN PRODUCCIÓN DE PRODUCTOS AGROECOLOGICOS TALLER 2.0000 800.00
0401010004 TALLER DE CAPACITACION EN MANEJO Y USO DE PASTOS CULTIVADOS TALLER 1.0000 800.00
0401010005 TALLER DE CAPACITACION EN LA PRODUCCION DE PRODUCTOS RENTABLES EN LA ZONA TALLER 2.0000 800.00
0401010006 TALLER DE CAPACITACION EN LA INTRODUCCION DE GANADOS MEJORADOS TALLER 2.0000 800.00
Precios y cantidades de recursos requeridos por tipo
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
Presupuestado Presupuestado
Sin/IGV S/. con/IGV S/.
MANO DE OBRA
792,153.70 792,153.70
852,391.71 852,391.71
4,157,740.00 4,157,740.00
5,802,285.41 5,802,285.41
MATERIALES
5,852.95 6,906.48
2,168.34 2,558.64
3,962.13 4,675.31
1,908.63 2,252.18
10,336.08 12,196.57
6,211.66 7,329.76
137.16 161.85
896.00 1,057.28
47.86 56.47
1.18 1.39
11.52 13.59
11.02 13.00
292,703.14 345,389.71
15,818.51 18,665.84
200,052.10 236,061.48
11,596.24 13,683.56
136,663.95 161,263.46
24,410.84 28,804.79
2,141.40 2,526.85
450.80 531.94
342.70 404.39
336.40 396.95
373.50 440.73
104.40 123.19
21,891.24 25,831.66
480,182.60 566,615.47
1,568.00 1,850.24
2,373.00 2,800.14
13,914.85 16,419.52
10,189.62 12,023.75
38,413.96 45,328.47
744.18 878.13
6,395.40 7,546.57
1,065.00 1,256.70
2,211.35 2,609.39
7,113.79 8,394.27
1,433.76 1,691.84
392.86 463.57
251.32 296.56
156,119.93 184,221.52
27,320.23 32,237.87
des de recursos requeridos por tipo VR 2
ACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE),
UIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
A - HUANCAVELICA
Presupuestado Presupuestado
Sin/IGV S/. con/IGV S/.
33.90 40.00
21.36 25.20
89,926.39 106,113.14
38,956.53 45,968.71
8,355.00 9,858.90
26,938.60 31,787.55
64.64 76.28
1,782.27 2,103.08
1,112.48 1,312.73
3,457.80 4,080.20
32,208.95 38,006.56
67,104.00 79,182.72
35,229.60 41,570.93
105,601.65 124,609.95
8.80 10.38
67,963.55 80,196.99
14,938.95 17,627.96
4,957.62 5,849.99
5,084.73 5,999.98
915.24 1,079.98
135.60 160.01
19,159.00 22,607.62
2,330.90 2,750.46
762.72 900.01
315.07 371.78
36.56 43.14
2,724.01 3,214.33
16,958.91 20,011.51
3,648.00 4,304.64
1,068.00 1,260.24
2,288.13 2,699.99
671.65 792.55
56,974.13 67,229.47
27,043.60 31,911.45
18,958.40 22,370.91
5,115.60 6,036.41
1,643.40 1,939.21
1,743.00 2,056.74
16,279.20 19,209.46
3,322.00 3,919.96
12,790.80 15,093.14
2,491.50 2,939.97
162.40 191.63
3,156.00 3,724.08
1,827.20 2,156.10
4,625.00 5,457.50
3,374.40 3,981.79
845.10 997.22
des de recursos requeridos por tipo VR 2
ACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE),
UIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
A - HUANCAVELICA
Presupuestado Presupuestado
Sin/IGV S/. con/IGV S/.
856.00 1,010.08
397.60 469.17
21,996.29 25,955.62
16,144.30 19,050.27
45,484.47 53,671.67
15,151.26 17,878.49
11,428.56 13,485.70
14,966.49 17,660.46
47,121.81 55,603.74
21,236.70 25,059.31
4,959.99 5,852.79
35,834.15 42,284.30
15,560.94 18,361.91
4,267.37 5,035.50
28,699.05 33,864.88
35,939.56 42,408.68
14,455.76 17,057.80
1,925.76 2,272.40
518.40 611.71
70,823.37 83,571.58
93,032.85 109,778.76
21,493.06 25,361.81
19,378.69 22,866.85
70,681.44 83,404.10
33,783.05 39,864.00
40.80 48.14
184,594.71 217,821.76
18,026.42 21,271.18
283,718.51 334,787.84
209,770.09 247,528.71
126,616.49 149,407.46
2,149.70 2,536.65
397.90 469.52
420.90 496.66
432.10 509.88
450.00 531.00
122.40 144.43
25,033.88 29,539.98
381.80 450.52
398.40 470.11
598.20 705.88
348.60 411.35
2,027.60 2,392.57
457.70 540.09
3,430.60 4,048.11
336.40 396.95
337.50 398.25
104.40 123.19
des de recursos requeridos por tipo VR 2
ACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE),
UIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
A - HUANCAVELICA
Presupuestado Presupuestado
Sin/IGV S/. con/IGV S/.
6.60 7.79
956.40 1,128.55
930.00 1,097.40
603.20 711.78
5,146.00 6,072.28
1,356.60 1,600.79
620.00 731.60
1,108.80 1,308.38
5,112.80 6,033.10
1,034.80 1,221.06
1,065.80 1,257.64
1,381.80 1,630.52
869.20 1,025.66
610.20 720.04
1,140.00 1,345.20
730.40 861.87
142.80 168.50
1,535.50 1,811.89
381.80 450.52
266.80 314.82
250.80 295.94
225.00 265.50
75.60 89.21
33,896.30 39,997.63
22,858.80 26,973.38
21,805.90 25,730.96
13,555.80 15,995.84
1,778.70 2,098.87
2,790.00 3,292.20
2,411.20 2,845.22
109.60 129.33
1,944.00 2,293.92
734.40 866.59
86.40 101.95
1,177.10 1,388.98
104.30 123.07
672.30 793.31
780.20 920.64
701.80 828.12
279.50 329.81
876.80 1,034.62
475.20 560.74
12,810.00 15,115.80
8,258.00 9,744.44
36,874.20 43,511.56
22,266.30 26,274.23
4,556.00 5,376.08
9,396.20 11,087.52
des de recursos requeridos por tipo VR 2
ACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE),
UIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
A - HUANCAVELICA
Presupuestado Presupuestado
Sin/IGV S/. con/IGV S/.
27,106.80 31,986.02
24,915.00 29,399.70
23,646.60 27,902.99
223,204.80 263,381.66
5,043.10 5,950.86
13,098.50 15,456.23
12,385.90 14,615.36
8,968.50 10,582.83
2,435.40 2,873.77
7,560.00 8,920.80
95,332.50 112,492.35
26,913.60 31,758.05
19,202.40 22,658.83
998.40 1,178.11
1,470.60 1,735.31
1,251.20 1,476.42
1,349.00 1,591.82
1,727.00 2,037.86
5,243.20 6,186.98
319.20 376.66
3,195.00 3,770.10
2,565.00 3,026.70
21,298.20 25,131.88
1,250.00 1,475.00
4,466,793.76 5,270,816.64
EQUIPOS
249,095.61 293,932.82
4,150.65 4,897.77
25,299.70 29,853.65
14,233.34 16,795.34
9,681.68 11,424.38
10,468.36 12,352.66
115.25 136.00
7,322.54 8,640.60
158,398.56 186,910.30
136,311.62 160,847.71
454.30 536.07
5,033.91 5,940.01
496,923.43 586,369.65
3,083.12 3,638.08
1,120,572.07 1,322,275.04
SUBCONTRATOS
1,600.00 1,888.00
800.00 944.00
1,600.00 1,888.00
1,600.00 1,888.00
des de recursos requeridos por tipo VR 2
ACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE),
UIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
A - HUANCAVELICA
Presupuestado Presupuestado
Sin/IGV S/. con/IGV S/.
1,037.37 1,224.10
1,500.00 1,770.00
1,200.00 1,416.00
2,000.00 2,360.00
1,000.00 1,180.00
2,000.00 2,360.00
2,250.00 2,655.00
78,994.88 93,213.96
27,443.53 32,383.37
83,407.84 98,421.25
16,037.03 18,923.70
5,488.97 6,476.98
14,744.32 17,398.30
1,600.00 1,888.00
800.00 944.00
1,600.00 1,888.00
800.00 944.00
800.00 944.00
800.00 944.00
500.00 590.00
7,500.00 8,850.00
10,500.00 12,390.00
267,603.94 315,772.65
11,657,255.18 12,711,149.74
1,053,894.56
RESUMEN DEL PRESUPUESTO ANALITICO GENERAL VR 2
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE
BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE
HUARIBAMBA - TAYACAJA - HUANCAVELICA
META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE
BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE
HUARIBAMBA - TAYACAJA - HUANCAVELICA
PRESUPUESTO APROBADO
ESPECIF.
DESCRIPCION
GASTO COSTO DIRECTO COSTO DIRECTO GASTOS GASTOS DE
TOTAL
S/IGV C/IGV GENERALES SUPERVISION
2.6.2.3.4.3 COSTO DE CONST.POR ADMIN.DIRECTA - PERSONAL 5,802,285.41 5,802,285.41 0.00 0.00 5,802,285.41
2.6.2.3.4.4 COSTO DE CONSTRUC.POR ADMIN.DIRECTA - BIENES 4,466,793.76 5,270,816.64 #NAME? 3,374.47 #NAME?
2.6.2.3.4.5 COSTO DE CONST.POR ADMIN.DIRECTA - SERVICIOS 1,388,176.01 1,638,047.69 #NAME? 53,737.61 #NAME?
PRESUPUESTO APROBADO
COSTO
ESPECIF. PARCIAL SIN PARCIAL CON
DESCRIPCION UNIDAD COEFI. CANTIDAD UNITARIO SIN
GASTO IGV IGV COSTO GASTOS GASTOS DE
IGV TOTAL
DIRECTO GENERALES SUPERVISION
PETROLEO (SUPERVISION Y RESIDENCIA) Mes 1.00 300.00 12.50 3,750.00 4,425.00 6,250.00 3,750.00
ZAPATOS DE SEGURIDAD CON PUNTA DE ACERO PAR 1.00 3.00 460.00 1,380.00 1,628.40 3,220.00 1,290.00
CASCOS DE SEGURIDAD BLANCO UND 1.00 3.00 50.00 150.00 177.00 350.00 120.00
POLOS CON LOGOTIPO UND 1.00 3.00 40.00 120.00 141.60 280.00 120.00
PONCHOS IMPERMEABLES UND 1.00 3.00 38.00 114.00 134.52 266.00 114.00
CASACAS IMPERMEABLES ACOLCHADAS UND 1.00 3.00 120.00 360.00 424.80 840.00 360.00
CHALECOS CON LOGO DE LA ENTIDAD UND 1.00 3.00 60.00 180.00 212.40 420.00 90.00
PONCHOS Y/O CAPOTINES IMPERMEABLES UND 1.00 0.00 38.00 0.00 0.00 0.00
CHALECOS CON LOGO UND 1.00 0.00 60.00 0.00 0.00 0.00
MAMELUCOS CON LOGO UND 1.00 0.00 50.00 0.00 0.00 0.00
POLOS DE TRABAJO CON LOGO UND 1.00 0.00 20.00 0.00 0.00 0.00
MEDICAMENTOS VARIOS GLB 1.00 9.00 448.01 4,032.09 4,757.87 4,032.09 0.00
CUADERNO DE OBRAS 100 FOLIOS UND 1.00 0.00 45.00 0.00 0.00 270.00 -270.00
LAPICEROS PILOT CAJA 1.00 3.00 36.00 108.00 127.44 180.00 -72.00
PAPEL BOND A-4 DE 80 GR ATLAS MILLAR 1.00 10.00 25.00 250.00 295.00 375.00 -125.00
PAPEL BOND F- A1 80 GR PARA PLANOS MILLAR 1.00 0.00 60.03 0.00 0.00 60.03 -60.03
CUADERNOS CUADRICULADO A4 UND 1.00 2.00 5.50 11.00 12.98 99.00 -88.00
FOLDER MANILA CIENTO 1.00 2.00 25.00 50.00 59.00 75.00 -25.00
LIBRETAS DE TOPOGRAFIA UND 1.00 10.00 5.00 50.00 59.00 75.00 -25.00
PARTES DIARIOS DE MAQUINARIA (BLOCK DE 50) BLOCK 1.00 0.00 35.00 0.00 0.00 1,400.00 -1,400.00
LAPIZ PORTAMINA UND 1.00 3.00 5.00 15.00 17.70 50.00 -35.00
STUCHE DE LAPIZ UND 1.00 2.00 1.50 3.00 3.54 7.50 -4.50
USB DE 8GB UND 1.00 3.00 60.00 180.00 212.40 360.00 -180.00
PRESUPUESTO APROBADO
COSTO
ESPECIF. PARCIAL SIN PARCIAL CON
DESCRIPCION UNIDAD COEFI. CANTIDAD UNITARIO SIN
GASTO IGV IGV COSTO GASTOS GASTOS DE
IGV TOTAL
DIRECTO GENERALES SUPERVISION
CLAVOS PARA MADERA C/C 2 1/2" kg 1.00 639.63 3.39 2,168.34 2,558.64 2,168.34
CLAVOS PARA MADERA C/C 3" kg 1.00 1,168.77 3.39 3,962.13 4,675.31 3,962.13
CLAVOS PARA MADERA C/C 4" kg 1.00 563.02 3.39 1,908.63 2,252.18 1,908.63
PERNOS HEXAGONALES DE 3/4" x 3 1/2" pza 1.00 27.00 5.08 137.16 161.85 137.16
PERNO HEXAGONAL P/BRIDA DE 6" INC.TUERCA und 1.00 70.00 12.80 896.00 1,057.28 896.00
POLEA METALICA DE DIAMETRO 3" X 1/2" und 1.00 2.00 23.93 47.86 56.47 47.86
PERNOS CON TUERCAS 1" X 1 1/4" und 1.00 2.00 0.59 1.18 1.39 1.18
PERNOS PARA GRAPAS 1/2" x 2 " und 1.00 2.00 5.76 11.52 13.59 11.52
GRAPAS 1/2" x 2" und 1.00 2.00 5.51 11.02 13.00 11.02
ACERO DE REFUERZO FY=4200 GRADO 60 kg 1.00 91,469.73 3.20 292,703.14 345,389.71 292,703.14
CANASTILLA PVC SAP DE 160mm und 1.00 43.00 49.80 2,141.40 2,526.85 2,141.40
CANASTILLA PVC SAP DE 110mm und 1.00 23.00 19.60 450.80 531.94 450.80
CANASTILLA PVC SAP DE 90mm und 1.00 23.00 14.90 342.70 404.39 342.70
CANASTILLA PVC SAP DE 75mm und 1.00 29.00 11.60 336.40 396.95 336.40
CANASTILLA PVC SAP DE 63mm und 1.00 45.00 8.30 373.50 440.73 373.50
CANASTILLA PVC SAP DE 50mm und 1.00 18.00 5.80 104.40 123.19 104.40
CEMENTO PORTLAND TIPO I (42.5KG) BOL 1.00 24,009.13 20.00 480,182.60 566,615.47 480,182.60
REJILLA METALICA (0.56x0.70) und 1.00 10.00 156.80 1,568.00 1,850.24 1,568.00
TAPA METALICA (0.60x0.60M) und 1.00 10.00 237.30 2,373.00 2,800.14 2,373.00
YESO EN BOLSAS DE 25 KG. BOL 1.00 117.01 6.36 744.18 878.13 744.18
CANASTILLA DE BRONCE 110MM und 1.00 11.00 581.40 6,395.40 7,546.57 6,395.40
ACOPLE DE MANGUERA A MANGUERA HDPE DE 1" und 1.00 150.00 7.10 1,065.00 1,256.70 1,065.00
WATER STOP PVC DE 6" m 1.00 173.99 12.71 2,211.35 2,609.39 2,211.35
ELECTRODOS (SOLDADURA CELLOCORD 3/16") kg 1.00 559.70 12.71 7,113.79 8,394.27 7,113.79
PEGAMENTO PVC DE ALTA PRESION gln 1.00 16.92 84.75 1,433.76 1,691.84 1,433.76
CABLE DE ACERO DE Ø 1/2" TIPO BOA m 1.00 18.54 21.19 392.86 463.57 392.86
CABLE DE ACERO DE Ø 1/4" TIPO BOA m 1.00 16.48 15.25 251.32 296.56 251.32
BARRENO 5' X 1/8" und 1.00 409.59 381.16 156,119.93 184,221.52 156,119.93
TEMPLADOR DE ACERO Ø 1/2" und 1.00 2.00 16.95 33.90 40.00 33.90
PRESUPUESTO ANALITICO GENERAL VR2
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL
CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
COMPONENTE META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA)
DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA
PRESUPUESTO APROBADO
COSTO
ESPECIF. PARCIAL SIN PARCIAL CON
DESCRIPCION UNIDAD COEFI. CANTIDAD UNITARIO SIN
GASTO IGV IGV COSTO GASTOS GASTOS DE
IGV TOTAL
DIRECTO GENERALES SUPERVISION
JUNTA INPER WATER STOP NEOPRENE 9" m 1.00 1.26 16.95 21.36 25.20 21.36
JUNTA INPER WATER STOP PVC 6" m 1.00 2,187.99 41.10 89,926.39 106,113.14 89,926.39
IMPERMEABILIZANTE (CHEMA 1 O SIMILAR) gln 1.00 218.89 177.97 38,956.53 45,968.71 38,956.53
MANGUERA HDPE DE 32MMx80M und 1.00 75.00 111.40 8,355.00 9,858.90 8,355.00
EMPAQUETADURA DE JEBE ENLONADO DE 6" und 1.00 5.05 12.80 64.64 76.28 64.64
CARTEL DE OBRA SEGUN DISEÑO (GIGANTOGRAFIA) m2 1.00 52.50 21.19 1,112.48 1,312.73 1,112.48
TAPA METALICA DE 0.80x0.80M, e= 1/8" und 1.00 17.00 203.40 3,457.80 4,080.20 3,457.80
TAPA METALICA DE 0.70x0.70M, e=1/8" und 1.00 181.00 177.95 32,208.95 38,006.56 32,208.95
TAPA METALICA DE 0.50x0.50M, e=1/8" und 1.00 466.00 144.00 67,104.00 79,182.72 67,104.00
TAPA METALICA DE (0.30x0.30M), e=1/8" und 1.00 756.00 46.60 35,229.60 41,570.93 35,229.60
MALLA DE ALAMB.GALV.# 12,COC. 2" X 2" m2 1.00 1,175.37 12.71 14,938.95 17,627.96 14,938.95
COMPUERTA METALICA CON IZAJE 0.50x0.50, H=4.00m
und 1.00 3.00 1,652.54 4,957.62 5,849.99 4,957.62
(SEGUN DISEÑO)
COMPUERTA METALICA CON IZAJE 0.50x0.70, H=4.00m
und 1.00 3.00 1,694.91 5,084.73 5,999.98 5,084.73
(SEGUN DISEÑO)
COMPUERTA METALICA DE 0.30x0.30 M, H=1.30 und 1.00 3.00 305.08 915.24 1,079.98 915.24
REJILLA METALICA (0.35x0.35M) und 1.00 238.00 80.50 19,159.00 22,607.62 19,159.00
REJILLA METALICA (0.80x1.00M) und 1.00 11.00 211.90 2,330.90 2,750.46 2,330.90
REJILLA METALICA 2.00m x 0.60m x 1", ESP. = 1" und 1.00 3.00 254.24 762.72 900.01 762.72
PINTURA ESMALTE SINTETICO gln 1.00 1.14 32.20 36.56 43.14 36.56
PINTURA ESMALTE ANTICORROSIVO TEKNO gln 1.00 49.46 55.08 2,724.01 3,214.33 2,724.01
UNION UNIVERSAL DE Fo. GALV. DE 6" und 1.00 12.00 304.00 3,648.00 4,304.64 3,648.00
NIPLE DE F°G° DE 6" und 1.00 12.00 89.00 1,068.00 1,260.24 1,068.00
ESCALERA DE GATO DE TUBO Ø 3/4", E=2.5MM, H=2.5M und 1.00 3.00 762.71 2,288.13 2,699.99 2,288.13
TUB. FIERRO FUNDIDO BB CENT. 6" (160MM) m 1.00 10.10 66.50 671.65 792.55 671.65
TUBERIA PVC ISO 4422 C-10, Ø= 1 1/2" m 1.00 11,869.61 4.80 56,974.13 67,229.47 56,974.13
CURVA PVC 11.25° ISO 4435, DN=250MM und 1.00 97.00 278.80 27,043.60 31,911.45 27,043.60
CURVA PVC 22.50° ISO 4435, DN=250MM und 1.00 68.00 278.80 18,958.40 22,370.91 18,958.40
CURVA PVC 45° ISO 4435, DN=250MM und 1.00 14.00 365.40 5,115.60 6,036.41 5,115.60
CURVA PVC 11.25° ISO 4435, DN=110MM und 1.00 33.00 49.80 1,643.40 1,939.21 1,643.40
CURVA PVC 22.50° ISO 4435, DN=110MM und 1.00 35.00 49.80 1,743.00 2,056.74 1,743.00
CURVA PVC 11.25° ISO 4435, DN=315MM und 1.00 28.00 581.40 16,279.20 19,209.46 16,279.20
CURVA PVC 11.25° ISO 4435, DN=355MM und 1.00 4.00 830.50 3,322.00 3,919.96 3,322.00
CURVA PVC 22.50° ISO 4435, DN=315MM und 1.00 22.00 581.40 12,790.80 15,093.14 12,790.80
CURVA PVC 22.50° ISO 4435, DN=355MM und 1.00 3.00 830.50 2,491.50 2,939.97 2,491.50
CURVA PVC 45° ISO 4435, DN=110MM und 1.00 4.00 40.60 162.40 191.63 162.40
CURVA PVC 45° ISO 4435, DN=315MM und 1.00 5.00 631.20 3,156.00 3,724.08 3,156.00
CURVA PVC 45° ISO 4435, DN=355MM und 1.00 2.00 913.60 1,827.20 2,156.10 1,827.20
TEE PVC SAP 160mm x 160mm und 1.00 50.00 92.50 4,625.00 5,457.50 4,625.00
TEE PVC SAP 110mm x 110mm und 1.00 74.00 45.60 3,374.40 3,981.79 3,374.40
PRESUPUESTO ANALITICO GENERAL VR2
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL
CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
COMPONENTE META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA)
DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA
PRESUPUESTO APROBADO
COSTO
ESPECIF. PARCIAL SIN PARCIAL CON
DESCRIPCION UNIDAD COEFI. CANTIDAD UNITARIO SIN
GASTO IGV IGV COSTO GASTOS GASTOS DE
IGV TOTAL
DIRECTO GENERALES SUPERVISION
TEE PVC SAP 90mm x 90mm und 1.00 27.00 31.30 845.10 997.22 845.10
TEE PVC SAP 75mm x 75mm und 1.00 40.00 21.40 856.00 1,010.08 856.00
TEE PVC SAP 63mm x 63mm und 1.00 28.00 14.20 397.60 469.17 397.60
TUBERIA PVC ISO 4422 D=110mm C-7.5 m 1.00 1,153.45 19.07 21,996.29 25,955.62 21,996.29
TUBERIA PVC ISO 4422 D=160mm C-7.5 m 1.00 406.76 39.69 16,144.30 19,050.27 16,144.30
TUBERIA PVC ISO 4422 D=110mm C-5.0 m 1.00 3,389.31 13.42 45,484.47 53,671.67 45,484.47
TUBERIA PVC ISO 4422 D=160mm C-5 m 1.00 537.66 28.18 15,151.26 17,878.49 15,151.26
TUBERIA PVC ISO 4422 D=160mm C-10 m 1.00 222.00 51.48 11,428.56 13,485.70 11,428.56
TUBERIA PVC ISO 4422 D=110mm C-10 m 1.00 607.16 24.65 14,966.49 17,660.46 14,966.49
TUBERIA PVC ISO 4422 D=90mm C-5.0 m 1.00 5,206.83 9.05 47,121.81 55,603.74 47,121.81
TUBERIA PVC ISO 4422 D=90mm C-7.5 m 1.00 1,634.85 12.99 21,236.70 25,059.31 21,236.70
TUBERIA PVC ISO 4422 D=90mm C-10 m 1.00 300.06 16.53 4,959.99 5,852.79 4,959.99
TUBERIA PVC ISO 4422 D=75mm C-5.0 m 1.00 5,340.41 6.71 35,834.15 42,284.30 35,834.15
TUBERIA PVC ISO 4422 D=75mm C-7.5 m 1.00 1,653.66 9.41 15,560.94 18,361.91 15,560.94
TUBERIA PVC ISO 4422 D=75mm C-10 m 1.00 363.18 11.75 4,267.37 5,035.50 4,267.37
TUBERIA PVC ISO 4422 D=63mm C-5.0 m 1.00 6,106.18 4.70 28,699.05 33,864.88 28,699.05
TUBERIA PVC ISO 4422 D=63mm C-7.5 m 1.00 5,554.80 6.47 35,939.56 42,408.68 35,939.56
TUBERIA PVC ISO 4422 D=63mm C-10 m 1.00 1,765.05 8.19 14,455.76 17,057.80 14,455.76
TUBERIA PVC ISO 4422 D=63mm C-15 m 1.00 167.46 11.50 1,925.76 2,272.40 1,925.76
TUBERIA PVC ISO 4422 D=50mm C-10 m 1.00 108.00 4.80 518.40 611.71 518.40
TUBERIA PVC ISO 4422 D=140mm C-5.0 m 1.00 3,236.90 21.88 70,823.37 83,571.58 70,823.37
TUBERIA PVC ISO 4422 D=200mm C-5.0 m 1.00 2,160.54 43.06 93,032.85 109,778.76 93,032.85
TUBERIA PVC ISO 4422 D=200mm C-7.5 m 1.00 345.27 62.25 21,493.06 25,361.81 21,493.06
TUBERIA PVC ISO 4422 D=200mm C-10 m 1.00 241.72 80.17 19,378.69 22,866.85 19,378.69
TUBERIA PVC ISO 4422 D=140mm C-7.5 m 1.00 2,290.39 30.86 70,681.44 83,404.10 70,681.44
TUBERIA PVC ISO 4422 D=140mm C-10 m 1.00 853.97 39.56 33,783.05 39,864.00 33,783.05
TEE PVC SAP 1 1/2" x 1 1/2" und 1.00 4.00 10.20 40.80 48.14 40.80
TUBERIA PVC ISO 4435 DN 160MM S-25, INC./ANILLO m 1.00 8,356.48 22.09 184,594.71 217,821.76 184,594.71
TUBERIA PVC ISO 4435 DN 355MM S-25 INC./ANILLO m 1.00 186.67 96.57 18,026.42 21,271.18 18,026.42
TUBERIA PVC ISO 4435 DN 200MM S-25, INC./ANILLO m 1.00 8,416.45 33.71 283,718.51 334,787.84 283,718.51
TUBERIA PVC ISO 4435 DN 250MM S-25, INC./ANILLO m 1.00 3,985.75 52.63 209,770.09 247,528.71 209,770.09
TUBERIA PVC ISO 4435 DN 315MM S-25, INC./ANILLO m 1.00 1,487.68 85.11 126,616.49 149,407.46 126,616.49
UNION SIMPLE PVC SAP 160MM pza 1.00 37.00 58.10 2,149.70 2,536.65 2,149.70
UNION SIMPLE PVC SAP 110MM pza 1.00 23.00 17.30 397.90 469.52 397.90
UNION SIMPLE PVC SAP 90MM pza 1.00 23.00 18.30 420.90 496.66 420.90
UNION SIMPLE PVC SAP 75MM pza 1.00 29.00 14.90 432.10 509.88 432.10
UNION SIMPLE PVC SAP 63MM pza 1.00 45.00 10.00 450.00 531.00 450.00
UNION SIMPLE PVC SAP 50MM pza 1.00 18.00 6.80 122.40 144.43 122.40
TUBERIA PVC ISO 4435 DN 110MM S-25, INC./ANILLO m 1.00 1,688.06 14.83 25,033.88 29,539.98 25,033.88
CONO DE REBOSE PVC 90MM und 1.00 23.00 16.60 381.80 450.52 381.80
CODO PVC SAP Ø 6"x90° und 1.00 6.00 66.40 398.40 470.11 398.40
CONO DE REBOSE PVC Ø 8" a 6" und 1.00 6.00 99.70 598.20 705.88 598.20
CODO PVC SAL Ø 160MMx45° UF und 1.00 6.00 58.10 348.60 411.35 348.60
CONO DE REBOSE PVC160MM und 1.00 37.00 54.80 2,027.60 2,392.57 2,027.60
CONO DE REBOSE PVC110MM und 1.00 23.00 19.90 457.70 540.09 457.70
NIPLE PVC SAP DE 1"x0.30M pza 1.00 1,009.00 3.40 3,430.60 4,048.11 3,430.60
PRESUPUESTO ANALITICO GENERAL VR2
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL
CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
COMPONENTE META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA)
DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA
PRESUPUESTO APROBADO
COSTO
ESPECIF. PARCIAL SIN PARCIAL CON
DESCRIPCION UNIDAD COEFI. CANTIDAD UNITARIO SIN
GASTO IGV IGV COSTO GASTOS GASTOS DE
IGV TOTAL
DIRECTO GENERALES SUPERVISION
CONO DE REBOSE PVC 75MM und 1.00 29.00 11.60 336.40 396.95 336.40
CONO DE REBOSE PVC 63MM und 1.00 45.00 7.50 337.50 398.25 337.50
CONO DE REBOSE PVC 50MM und 1.00 18.00 5.80 104.40 123.19 104.40
ADAPTADOR PVC SAP 1 1/2" und 1.00 2.00 3.30 6.60 7.79 6.60
ADAPTADOR PVC SAP 6" und 1.00 12.00 79.70 956.40 1,128.55 956.40
ADAPTADOR PVC SAP 75MM und 1.00 124.00 7.50 930.00 1,097.40 930.00
ADAPTADOR PVC SAP 63MM und 1.00 104.00 5.80 603.20 711.78 603.20
ADAPTADOR PVC SAP 160MM und 1.00 124.00 41.50 5,146.00 6,072.28 5,146.00
ADAPTADOR PVC SAP 110MM und 1.00 102.00 13.30 1,356.60 1,600.79 1,356.60
ADAPTADOR PVC SAP 90MM und 1.00 62.00 10.00 620.00 731.60 620.00
ADAPTADOR PVC SAP 50MM und 1.00 336.00 3.30 1,108.80 1,308.38 1,108.80
CODO PVC SAP 160 mm X 90° und 1.00 77.00 66.40 5,112.80 6,033.10 5,112.80
CODO PVC SAP 90 mm X 90° und 1.00 52.00 19.90 1,034.80 1,221.06 1,034.80
CODO PVC SAP 75 mm X 90° und 1.00 73.00 14.60 1,065.80 1,257.64 1,065.80
CODO PVC SAP 63 mm X 90° und 1.00 98.00 14.10 1,381.80 1,630.52 1,381.80
CODO PVC SAP 50 mm X 90° und 1.00 41.00 21.20 869.20 1,025.66 869.20
CODO PVC SAP 110 mm X 90° und 1.00 54.00 11.30 610.20 720.04 610.20
CODO PVC SAP 1 1/2" und 1.00 150.00 7.60 1,140.00 1,345.20 1,140.00
CODO PVC ISO 4422 C-5.0 Ø=110MM und 1.00 44.00 16.60 730.40 861.87 730.40
CODO PVC SAP 2" und 1.00 14.00 10.20 142.80 168.50 142.80
TRANSICION PVC SAP DE 160mm pza 1.00 37.00 41.50 1,535.50 1,811.89 1,535.50
TRANSICION PVC SAP DE 110mm pza 1.00 23.00 16.60 381.80 450.52 381.80
TRANSICION PVC SAP DE 90mm pza 1.00 23.00 11.60 266.80 314.82 266.80
TRANSICION PVC SAP DE 75mm pza 1.00 38.00 6.60 250.80 295.94 250.80
TRANSICION PVC SAP DE 63mm pza 1.00 45.00 5.00 225.00 265.50 225.00
TRANSICION PVC SAP DE 50mm pza 1.00 18.00 4.20 75.60 89.21 75.60
CURVA PVC 11.25° ISO 4435, DN=200mm und 1.00 157.00 215.90 33,896.30 39,997.63 33,896.30
CURVA PVC 11.25° ISO 4435, DN=160mm und 1.00 172.00 132.90 22,858.80 26,973.38 22,858.80
CURVA PVC 22.50° ISO 4435, DN=200mm und 1.00 101.00 215.90 21,805.90 25,730.96 21,805.90
CURVA PVC 22.50° ISO 4435, DN=160mm und 1.00 102.00 132.90 13,555.80 15,995.84 13,555.80
CURVA PVC 45° ISO 4435, DN=160mm und 1.00 21.00 84.70 1,778.70 2,098.87 1,778.70
CURVA PVC 45° ISO 4435, DN=200mm und 1.00 12.00 232.50 2,790.00 3,292.20 2,790.00
REDUCCION PVC 160mm a 110mm und 1.00 44.00 54.80 2,411.20 2,845.22 2,411.20
REDUCCION PVC 160mm a 75mm und 1.00 2.00 54.80 109.60 129.33 109.60
REDUCCION PVC 110mm a90mm und 1.00 90.00 21.60 1,944.00 2,293.92 1,944.00
REDUCCION PVC 110mm a 75mm und 1.00 34.00 21.60 734.40 866.59 734.40
REDUCCION PVC 110mm a 63mm und 1.00 4.00 21.60 86.40 101.95 86.40
REDUCCION PVC 90mm a 75mm und 1.00 79.00 14.90 1,177.10 1,388.98 1,177.10
REDUCCION PVC 90mm a 63mm und 1.00 7.00 14.90 104.30 123.07 104.30
REDUCCION PVC 75mm a 63mm und 1.00 81.00 8.30 672.30 793.31 672.30
REDUCCION PVC 75mm a 1 1/2" und 1.00 94.00 8.30 780.20 920.64 780.20
REDUCCION PVC 63mm a 1 1/2" und 1.00 121.00 5.80 701.80 828.12 701.80
REDUCCION PVC 90mm a 1 1/2" und 1.00 43.00 6.50 279.50 329.81 279.50
REDUCCION PVC 160mm a 1 1/2" und 1.00 16.00 54.80 876.80 1,034.62 876.80
REDUCCION PVC 110mm a 1 1/2" und 1.00 22.00 21.60 475.20 560.74 475.20
VALVULA COMPUERTA DE BRONCE DE 6" und 1.00 6.00 2,135.00 12,810.00 15,115.80 12,810.00
PRESUPUESTO ANALITICO GENERAL VR2
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL
CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
COMPONENTE META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA)
DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA
PRESUPUESTO APROBADO
COSTO
ESPECIF. PARCIAL SIN PARCIAL CON
DESCRIPCION UNIDAD COEFI. CANTIDAD UNITARIO SIN
GASTO IGV IGV COSTO GASTOS GASTOS DE
IGV TOTAL
DIRECTO GENERALES SUPERVISION
VALVULA COMPUERTA DE BRONCE ISO 4422 DN 160MM und 1.00 10.00 825.80 8,258.00 9,744.44 8,258.00
VALVULA ESFERICA DE METAL DE 160MM und 1.00 37.00 996.60 36,874.20 43,511.56 36,874.20
VALVULA ESFERICA DE METAL DE 110MM und 1.00 23.00 968.10 22,266.30 26,274.23 22,266.30
VALVULA ESFERICA DE BRONCE 3" und 1.00 8.00 569.50 4,556.00 5,376.08 4,556.00
VALVULA ESFERICA DE BRONCE 2 1/2" und 1.00 22.00 427.10 9,396.20 11,087.52 9,396.20
VALVULA ESFERICA DE BRONCE 4" und 1.00 28.00 968.10 27,106.80 31,986.02 27,106.80
VALVULA ESFERICA DE BRONCE 6" und 1.00 25.00 996.60 24,915.00 29,399.70 24,915.00
VALVULA ESFERICA DE BRONCE 1 1/2" und 1.00 151.00 156.60 23,646.60 27,902.99 23,646.60
VALVULA DE AIRE AUTOMATICO ROSCADA DOBLE ESFERA
und 1.00 784.00 284.70 223,204.80 263,381.66 223,204.80
1"
VALVULA ESFERICA DE BRONCE 2" und 1.00 29.00 173.90 5,043.10 5,950.86 5,043.10
VALVULA ESFERICA DE METAL DE 90MM und 1.00 23.00 569.50 13,098.50 15,456.23 13,098.50
VALVULA ESFERICA DE METAL DE 75MM und 1.00 29.00 427.10 12,385.90 14,615.36 12,385.90
VALVULA ESFERICA DE METAL DE 63MM und 1.00 45.00 199.30 8,968.50 10,582.83 8,968.50
VALVULA ESFERICA DE METAL DE 50MM und 1.00 18.00 135.30 2,435.40 2,873.77 2,435.40
TOMA MANOMÉTRICA CONEXIÓN ROSCA 1/8'' BSP und 1.00 756.00 10.00 7,560.00 8,920.80 7,560.00
ASPERSOR VYR 20 3.16 BARS, BOQUILLA 4.36x2.38MM und 1.00 225.00 423.70 95,332.50 112,492.35 95,332.50
VALVULA DE ACOPLE RAPIDO HDPE DE 1" und 1.00 756.00 35.60 26,913.60 31,758.05 26,913.60
VALVULA DE BOLA HDPE DE 1" und 1.00 756.00 25.40 19,202.40 22,658.83 19,202.40
COLLARIN DE DERIVACION HDPE 90MMx1" und 1.00 78.00 12.80 998.40 1,178.11 998.40
COLLARIN DE DERIVACION HDPE 75MMx1" und 1.00 129.00 11.40 1,470.60 1,735.31 1,470.60
COLLARIN DE DERIVACION HDPE 63MMx1" und 1.00 136.00 9.20 1,251.20 1,476.42 1,251.20
COLLARIN DE DERIVACION HDPE 50MMx1" und 1.00 190.00 7.10 1,349.00 1,591.82 1,349.00
COLLARIN DE DERIVACION HDPE 110MMx1" und 1.00 110.00 15.70 1,727.00 2,037.86 1,727.00
COLLARIN DE DERIVACION HDPE 160MMx1" und 1.00 113.00 46.40 5,243.20 6,186.98 5,243.20
UNION HDPE DE 1" und 1.00 28.00 11.40 319.20 376.66 319.20
CODO HDPE DE 1" und 1.00 225.00 14.20 3,195.00 3,770.10 3,195.00
TEE HDPE DE 1" und 1.00 150.00 17.10 2,565.00 3,026.70 2,565.00
VALVULA DE BRONCE ISO 4422 Ø=110MM und 1.00 22.00 968.10 21,298.20 25,131.88 21,298.20
INSTALACION DE CARTELES DE IDENTIFICACION und 1.00 5.00 250.00 1,250.00 1,475.00 1,250.00
PRESUPUESTO APROBADO
COSTO
ESPECIF. PARCIAL SIN PARCIAL CON
DESCRIPCION UNIDAD COEFI. CANTIDAD UNITARIO SIN
GASTO IGV IGV COSTO GASTOS GASTOS DE
IGV TOTAL
DIRECTO GENERALES SUPERVISION
PERSONAL PESC SEDE CUSCO Mes 1.00 4.00 1,000.00 4,000.00 4,000.00
DISEÑO DE MEZCLA Y ROTURA DE PROBETAS UND 1.00 0.00 2,500.00 0.00 0.00 0.00
ESTUDIO DE MECANICA DE SUELOS UND 1.00 0.00 3,000.00 0.00 0.00 0.00
SERVICIO DE VERIFICACION DE DENSIDAD DE
UND 1.00 4.00 85.00 340.00 401.20 340.00
COMPACTACION
ALQUILER DE CAMIONETA 4X4 DOBLE CABINA Y DOBLE
MES 1.00 1.00 7,500.00 7,500.00 8,850.00 7,500.00
TRACCION
LEGALIZACION DE CUADERNO DE OBRA UND 1.00 0.00 50.00 0.00 0.00 0.00
ALQUILER DE LOCAL PARA OFICINA Y ALMACEN MES 1.00 4.00 540.00 2,160.00 2,548.80 2,160.00
SERVICIO DE ALIMENTACION DE PERSONAL TECNICO MES 1.00 4.00 1,934.40 7,737.61 9,130.38 7,737.61
TALLER DE CAPACITACION EN PRODUCCIÓN DE
TALLER 1.00 2.00 800.00 1,600.00 1,888.00 1,600.00
PRODUCTOS AGROECOLOGICOS
TALLER DE CAPACITACION EN MANEJO Y USO DE PASTOS
TALLER 1.00 1.00 800.00 800.00 944.00 800.00
CULTIVADOS
TALLER DE CAPACITACION EN LA PRODUCCION DE
TALLER 1.00 2.00 800.00 1,600.00 1,888.00 1,600.00
PRODUCTOS RENTABLES EN LA ZONA
TALLER DE CAPACITACION EN LA INTRODUCCION DE
TALLER 1.00 2.00 800.00 1,600.00 1,888.00 1,600.00
GANADOS MEJORADOS
SERVICIO DE COLOCACION DE CARTEL DE OBRA und 1.00 3.00 345.79 1,037.37 1,224.10 1,037.37
ENCAUSAMIENTO DE RECURSOS DE AGUA GLB 1.00 1.00 1,500.00 1,500.00 1,770.00 1,500.00
LIMPIEZA Y REHABILITACIÓN DE AREAS AGRICOLAS Y VIAS GLB 1.00 1.00 1,200.00 1,200.00 1,416.00 1,200.00
RECUPERACIÓN DE SUELO CON FORESTACION DE
GLB 1.00 1.00 2,000.00 2,000.00 2,360.00 2,000.00
PLANTONES NATIVAS
RESTAURACION DE AREA DE CAMPAMENTO
GLB 1.00 1.00 1,000.00 1,000.00 1,180.00 1,000.00
FLETE TERRESTRE DESDE HUANCAYO A ANTA ALTA GLB 1.00 1.00 78,994.88 78,994.88 93,213.96 78,994.88
FLETE TERRESTRE DESDE HUANCAYO A ANTA BAJA GLB 1.00 1.00 27,443.53 27,443.53 32,383.37 27,443.53
FLETE TERRESTRE DESDE HUANCAYO A PICHUS GLB 1.00 1.00 83,407.84 83,407.84 98,421.25 83,407.84
FLETE RURAL ALMACEN - PIE DE OBRA (ANTA ALTA) GLB 1.00 1.00 16,037.03 16,037.03 18,923.70 16,037.03
FLETE RURAL ALMACEN - PIE DE OBRA (ANTA BAJA) GLB 1.00 1.00 5,488.97 5,488.97 6,476.98 5,488.97
FLETE RURAL ALMACEN - PIE DE OBRA (PICHUS) GLB 1.00 1.00 14,744.32 14,744.32 17,398.30 14,744.32
TALLER DE CAPACITACION EN RIEGO POR ASPERSIÓN TALLER 1.00 2.00 800.00 1,600.00 1,888.00 1,600.00
TALLER DE CAPACITACION EN CONSERVACIÓN DE SUELO TALLER 1.00 1.00 800.00 800.00 944.00 800.00
TALLER DE CAPACITACION EN OPERACION Y MANEJO DEL
TALLER 1.00 2.00 800.00 1,600.00 1,888.00 1,600.00
SISTEMA DE RIEGO
TALLER DE CAPACITACION EN USO Y MANEJO DE
TALLER 1.00 1.00 800.00 800.00 944.00 800.00
FERTILIZANTES
TALLER DE CAPACITACION PARA LA CONFORMACION DE
TALLER 1.00 1.00 800.00 800.00 944.00 800.00
CADENAS PRODUCTIVAS
TALLER DE CAPACITACION EN TEMAS DE ARTICULACION
TALLER 1.00 1.00 800.00 800.00 944.00 800.00
AL MERCADO
CONFORMACION DE ASOCIACON DE PRODUCTORES
GLB 1.00 1.00 500.00 500.00 590.00 500.00
AGROPECUARIOS
PASANTIA AL EX PROYECTO CACHI- AYACUCHO (20
VJE 1.00 1.00 7,500.00 7,500.00 8,850.00 7,500.00
PASANTES)
PASANTIA AL VALLE DE URUBAMBA-CUSCO (20 PASANTES) VJE 1.00 1.00 10,500.00 10,500.00 12,390.00 10,500.00
PRESUPUESTO APROBADO
COSTO
ESPECIF. PARCIAL SIN PARCIAL CON
DESCRIPCION UNIDAD COEFI. CANTIDAD UNITARIO SIN
GASTO IGV IGV COSTO GASTOS GASTOS DE
IGV TOTAL
DIRECTO GENERALES SUPERVISION
COMPACTADOR VIBR. TIPO PLANCHA 7 HP hm 1.00 864.53 8.47 7,322.54 8,640.60 7,322.54
MOVILIZACION EQUIPO PESADO und 1.00 3.00 1,677.97 5,033.91 5,940.01 5,033.91
PRESUPUESTO APROBADO
ESPECIF. COSTO
DESCRIPCION UNIDAD COEFIC. CANTIDAD COSTO
GASTO UNITARIO PARCIAL TOTAL
DIRECTO
Tiempo total
Supervisión Liquidación
Item Descripción Und. Cant. de P. U. (S/.) Parcial (S/.) Total (S/.)
de obra de obra
participación
MODALIDAD : #NAME?
UBICACIÓN: : #NAME? Año Fiscal : #NAME?
PRESUPUESTO APROBADO
ESPECIF.
DESCRIPCION UNIDAD COSTO INDIRECTO
GASTO COSTO
DIRECTO GASTOS GASTO GESTION DE LIQUIDACION DE
TOTAL
GENERALES SUPERVISION PROYECTO OBRA
LB 422,200.67 0.00
2.6.2.3.4.4 COSTO DE CONSTRUCCION POR CONTRATA - BIENES 1,727,434.34 30,959.62 6,716.00 1,900.00 1,767,009.96
2.6.2.3.4.5 COSTO DE CONSTRUCCION POR CONTRATA - SERVICIOS 271,143.41 170,990.00 103,581.61 19,000.00 15,550.00 580,265.02