RESUMEN DEL PRESUPUESTO ANALITICO GENERAL VR 1

: MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-
PROY.
PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA

: MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-
META
PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA

MODALIDAD : DE EJECUCIÓN POR CONTRATA

UBICACIÓN : HUARIBAMBA - TAYACAJA - HUANCAVELICA Fecha : Feb-18

PRESUPUESTO APROBADO
ESPECIF.
DESCRIPCION
GASTO COSTO DIRECTO GASTOS GASTOS DE
UTILIDAD SUB TOTAL IGV TOTAL
S/IGV GENERALES SUPERVISION

2.6.2.3.4.3 COSTO DE CONST.POR CONTRATA - PERSONAL 5,802,285.41 0.00 406,159.98 6,208,445.39 1,117,520.17 0.00 7,325,965.56

2.6.2.3.4.4 COSTO DE CONSTRUC.POR CONTRATA - BIENES 4,466,793.76 #NAME? 312,675.56 #NAME? #NAME? 3,374.47 #NAME?

2.6.2.3.4.5 COSTO DE CONST.POR CONTRATA - SERVICIOS 1,388,176.01 #NAME? 97,172.32 #NAME? #NAME? 53,737.61 #NAME?

TOTAL S/. 11,657,255.18 #NAME? 816,007.86 #NAME? #NAME? 57,112.08 #NAME?


RESUMEN DE PRESUPUESTO DE OBRA VR 01

PROYECTO: MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-
PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y
CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA

COMPONENTE META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO


PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-
PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
#REF!

Ubicación : HUARIBAMBA - TAYACAJA - HUANCAVELICA

Item Descripción Und. Parcial (S/.)


01 SISTEMA DE RIEGO ANTA ALTA Glb 4,822,325.51
01.01 OBRAS PRELIMINARES Glb 2,933.97
01.02 OBRAS DE CAPTACION Y CONTROL DE CAUDALES Glb 117,636.44
01.03 CONSTRUCCION CANAL CONDUCCION (L=8.504 KM) Glb 877,208.01
01.04 OBRAS DE ARTE Glb 142,234.41
01.05 OBRAS DE ALMACENAMIENTO Glb 1,056,869.06
01.06 LINEA DE DISTRIBUCION DE LA RED DE RIEGO ( 26,270.53 ML) Glb 1,781,254.15
01.07 OBRAS DE ARTE Glb 698,400.29
01.08 LATERAL DE RIEGO MOVIL Glb 46,873.80
01.09 FLETE Glb 98,915.38
02 SISTEMA DE RIEGO ANTA BAJA Glb 1,614,327.50
02.01 OBRAS PRELIMINARES Glb 2,933.97
02.02 OBRAS DE CAPTACION Y CONTROL DE CAUDALES Glb 121,665.43
02.03 CONSTRUCCION CANAL CONDUCCION (L=4.636 KM) Glb 441,188.77
02.04 OBRAS DE ARTE Glb 82,013.38
02.05 OBRAS DE ALMACENAMIENTO Glb 291,227.83
02.06 LINEA DE DISTRIBUCION DE LA RED DE RIEGO ( 7,054.99 ML) Glb 417,507.82
02.07 OBRAS DE ARTE Glb 205,341.27
02.08 LATERAL DE RIEGO MOVIL Glb 23,436.90
02.09 FLETE Glb 29,012.13
03 SISTEMA DE RIEGO PICHOS Glb 5,220,602.17
03.01 OBRAS PRELIMINARES Glb 2,933.97
03.02 OBRAS DE CAPTACION Y CONTROL DE CAUDALES Glb 134,585.03
03.03 CONSTRUCCION CANAL CONDUCCION (L=9.85 KM) Glb 1,231,830.15
03.04 OBRAS DE ARTE Glb 165,577.55
03.05 OBRAS DE ALMACENAMIENTO Glb 893,113.25
03.06 LINEA DE DISTRIBUCION DE LA RED DE RIEGO ( 22,664.15 ML) Glb 1,839,036.72
03.07 OBRAS DE ARTE Glb 766,762.64
03.08 LATERAL DE RIEGO MOVIL Glb 46,873.80
03.09 FLETE Glb 98,189.06
03.10 CAPACITACIÓN Glb 30,500.00
03.11 MITIGACION AMBIENTAL Glb 11,200.00
COSTO DIRECTO 11,657,255.18
Gastos Generales (0%) #REF!
Utilidad (7%) 816,007.86
Sub Total 1 #REF!
I.G.V. (18% SUB TOTAL 1) #REF!
SUPERVISION (0%) #REF!
VALOR REFERENCIAL 1 #REF!
RESUMEN DE PRESUPUESTO DE OBRA VR 02
PROYECTO: MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-
PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y
CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
COMPONENTE META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO
PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-
PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
#REF!

Ubicación : HUARIBAMBA - TAYACAJA - HUANCAVELICA

Item Descripción Und. Parcial (S/.)


01 SISTEMA DE RIEGO ANTA ALTA Glb 4,822,325.51
01.01 OBRAS PRELIMINARES Glb 2,933.97
01.02 OBRAS DE CAPTACION Y CONTROL DE CAUDALES Glb 117,636.44
01.03 CONSTRUCCION CANAL CONDUCCION (L=8.504 KM) Glb 877,208.01
01.04 OBRAS DE ARTE Glb 142,234.41
01.05 OBRAS DE ALMACENAMIENTO Glb 1,056,869.06
01.06 LINEA DE DISTRIBUCION DE LA RED DE RIEGO ( 26,270.53 MLGlb 1,781,254.15
01.07 OBRAS DE ARTE Glb 698,400.29
01.08 LATERAL DE RIEGO MOVIL Glb 46,873.80
01.09 FLETE Glb 98,915.38
02 SISTEMA DE RIEGO ANTA BAJA Glb 1,614,327.50
02.01 OBRAS PRELIMINARES Glb 2,933.97
02.02 OBRAS DE CAPTACION Y CONTROL DE CAUDALES Glb 121,665.43
02.03 CONSTRUCCION CANAL CONDUCCION (L=4.636 KM) Glb 441,188.77
02.04 OBRAS DE ARTE Glb 82,013.38
02.05 OBRAS DE ALMACENAMIENTO Glb 291,227.83
02.06 LINEA DE DISTRIBUCION DE LA RED DE RIEGO ( 7,054.99 ML)Glb 417,507.82
02.07 OBRAS DE ARTE Glb 205,341.27
02.08 LATERAL DE RIEGO MOVIL Glb 23,436.90
02.09 FLETE Glb 29,012.13
03 SISTEMA DE RIEGO PICHOS Glb 5,220,602.17
03.01 OBRAS PRELIMINARES Glb 2,933.97
03.02 OBRAS DE CAPTACION Y CONTROL DE CAUDALES Glb 134,585.03
03.03 CONSTRUCCION CANAL CONDUCCION (L=9.85 KM) Glb 1,231,830.15
03.04 OBRAS DE ARTE Glb 165,577.55
03.05 OBRAS DE ALMACENAMIENTO Glb 893,113.25
03.06 LINEA DE DISTRIBUCION DE LA RED DE RIEGO ( 22,664.15 MLGlb 1,839,036.72
03.07 OBRAS DE ARTE Glb 766,762.64
03.08 LATERAL DE RIEGO MOVIL Glb 46,873.80
03.09 FLETE Glb 98,189.06
03.10 CAPACITACIÓN Glb 30,500.00
03.11 MITIGACION AMBIENTAL Glb 11,200.00
COSTO DIRECTO 11,657,255.18
Gastos Generales (0%) #REF!
SUPERVISION (0%) #REF!
Sub Total 1 #REF!
I.G.V. (18% Aplicado a los Materiales, Equipos y Sub Contratos) 1,053,894.56
VALOR REFERENCIAL 2 #REF!
VR 2
RESUMEN DE PRESUPUESTO DE OBRA

PROYECTO: MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-
PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-
CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
COMPONENTE META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-
PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-
CHICURO DEL CP. PICHOS
#REF!

UBICACIÓN: : HUARIBAMBA - TAYACAJA - HUANCAVELICA

Presupuesto Mano de Obra Materiales Equipos SUBCONTRATOS

COMPONENTE META : MEJORAMIENTO,


AMPLIACION Y CREACION DEL SISTEMA DE RIEGO
S/. 5,802,285.41 S/. 4,466,793.76 S/. 1,120,572.07 S/. 267,603.94
PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-
ASNACE), PARTE BAJA (PUNRUPUQUIO-
PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y
CHINCHIPAMPA-CHICURO DEL CP. PICHOS

Total = S/. 5,802,285.41 S/. 4,466,793.76 S/. 1,120,572.07 S/. 267,603.94

Costo Directo S/. 11,657,255.18


Gastos Generales #REF! #REF!
SUPERVISION #REF! #REF!
Sub Total 1 #REF!
I.G.V. (18% (Materiales, Equipos, Sub Contratos)) S/. 1,053,894.56
COSTO DEL PROYECTO #REF!
Precios y cantidades de recursos requeridos por tipo
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA

META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS

MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA


UBICACIÓN: : HUARIBAMBA - TAYACAJA - HUANCAVELICA Fecha : Feb-18

Código Recurso Unidad Cantidad Precio S/.

MANO DE OBRA
147010002 OPERARIO hh 37,703.65 21.01
147010003 OFICIAL hh 50,052.36 17.03
147010004 PEON hh 271,215.92 15.33

MATERIALES
0201800004 LUBRICANTE gln 172.6535 33.90
0202010002 CLAVOS PARA MADERA C/C 2 1/2" kg 639.6275 3.39
0202010005 CLAVOS PARA MADERA C/C 3" kg 1,168.7695 3.39
0202010007 CLAVOS PARA MADERA C/C 4" kg 563.0179 3.39
0202040009 ALAMBRE NEGRO N°16 kg 3,048.9923 3.39
0202040010 ALAMBRE NEGRO N°8 kg 1,832.3490 3.39
0202100010 PERNOS HEXAGONALES DE 3/4" x 3 1/2" pza 27.0000 5.08
0202100053 PERNO HEXAGONAL P/BRIDA DE 6" INC.TUERCA und 70.0000 12.80
0202130010 POLEA METALICA DE DIAMETRO 3" X 1/2" und 2.0000 23.93
0202510100 PERNOS CON TUERCAS 1" X 1 1/4" und 2.0000 0.59
0202510101 PERNOS PARA GRAPAS 1/2" x 2 " und 2.0000 5.76
0202910002 GRAPAS 1/2" x 2" und 2.0000 5.51
0202970002 ACERO DE REFUERZO FY=4200 GRADO 60 kg 91,469.7315 3.20
0204000000 ARENA FINA m3 143.5827 110.17
0205000004 PIEDRA CHANCADA DE 3/4" m3 1,815.8491 110.17
0205010000 AFIRMADO PREPARADO m3 136.8288 84.75
0205010004 ARENA GRUESA m3 1,343.9271 101.69
0205020021 PIEDRA GRANDE m3 303.2026 80.51
0211010101 CANASTILLA PVC SAP DE 160mm und 43.0000 49.80
0211010102 CANASTILLA PVC SAP DE 110mm und 23.0000 19.60
0211010103 CANASTILLA PVC SAP DE 90mm und 23.0000 14.90
0211010104 CANASTILLA PVC SAP DE 75mm und 29.0000 11.60
0211010105 CANASTILLA PVC SAP DE 63mm und 45.0000 8.30
0211010106 CANASTILLA PVC SAP DE 50mm und 18.0000 5.80
0213030013 DINATRID (GEL) gln 178.1514 122.88
0221000000 CEMENTO PORTLAND TIPO I (42.5KG) BOL 24,009.1299 20.00
0226270002 REJILLA METALICA (0.56x0.70) und 10.0000 156.80
0226280001 TAPA METALICA (0.60x0.60M) und 10.0000 237.30
0227000001 MECHA NARANJA m 10,956.5762 1.27
0227020011 FULMINANTE und 10,956.5762 0.93
0228000022 DINAMITA kg 12,041.9931 3.19
0229030002 YESO EN BOLSAS DE 25 KG. BOL 117.0100 6.36
0229070142 CANASTILLA DE BRONCE 110MM und 11.0000 581.40
0229070143 ACOPLE DE MANGUERA A MANGUERA HDPE DE 1" und 150.0000 7.10
0229120005 WATER STOP PVC DE 6" m 173.9850 12.71
0229550092 ELECTRODOS (SOLDADURA CELLOCORD 3/16") kg 559.7000 12.71
0230010102 PEGAMENTO PVC DE ALTA PRESION gln 16.9175 84.75
0230020096 CABLE DE ACERO DE Ø 1/2" TIPO BOA m 18.5400 21.19
0230020097 CABLE DE ACERO DE Ø 1/4" TIPO BOA m 16.4800 15.25
0230080010 BARRENO 5' X 1/8" und 409.5916 381.16
0230240011 CHEMALAC Y DISOLVENTE gln 153.5103 177.97
Precios y cantidades de recursos requeridos por tipo
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA

META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS

MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA


UBICACIÓN: : HUARIBAMBA - TAYACAJA - HUANCAVELICA Fecha : Feb-18

Código Recurso Unidad Cantidad Precio S/.

0230420067 TEMPLADOR DE ACERO Ø 1/2" und 2.0000 16.95


0230650006 JUNTA INPER WATER STOP NEOPRENE 9" m 1.2600 16.95
0230650020 JUNTA INPER WATER STOP PVC 6" m 2,187.9900 41.10
0230860092 IMPERMEABILIZANTE (CHEMA 1 O SIMILAR) gln 218.8938 177.97
0230920020 MANGUERA HDPE DE 32MMx80M und 75.0000 111.40
0238000000 HORMIGON m3 276.4067 97.46
0239040052 EMPAQUETADURA DE JEBE ENLONADO DE 6" und 5.0500 12.80
0239050000 AGUA m3 4,243.4901 0.42
0239100100 CARTEL DE OBRA SEGUN DISEÑO (GIGANTOGRAFIA) m2 52.5000 21.19
0239990095 TAPA METALICA DE 0.80x0.80M, e= 1/8" und 17.0000 203.40
0239990099 TAPA METALICA DE 0.70x0.70M, e=1/8" und 181.0000 177.95
0239990100 TAPA METALICA DE 0.50x0.50M, e=1/8" und 466.0000 144.00
0239990101 TAPA METALICA DE (0.30x0.30M), e=1/8" und 756.0000 46.60
0243010003 MADERA TORNILLO p2 22,661.2975 4.66
0243160053 REGLA DE MADERA p2 1.5964 5.51
0244030019 TRIPLAY DE 4'x8'x 19 mm pln 641.5893 105.93
0246130004 MALLA DE ALAMB.GALV.# 12,COC. 2" X 2" m2 1,175.3700 12.71
0250020072 COMPUERTA METALICA CON IZAJE 0.50x0.50, H=4.00m (SEGUN DISEÑO) und 3.0000 1,652.54
0250020073 COMPUERTA METALICA CON IZAJE 0.50x0.70, H=4.00m (SEGUN DISEÑO) und 3.0000 1,694.91
0250020074 COMPUERTA METALICA DE 0.30x0.30 M, H=1.30 und 3.0000 305.08
0251130053 PLATINA 1" X 1/8" m 40.0000 3.39
0251990098 REJILLA METALICA (0.35x0.35M) und 238.0000 80.50
0251990099 REJILLA METALICA (0.80x1.00M) und 11.0000 211.90
0251990101 REJILLA METALICA 2.00m x 0.60m x 1", ESP. = 1" und 3.0000 254.24
0253030027 THINER gln 24.7895 12.71
0254020100 PINTURA ESMALTE SINTETICO gln 1.1355 32.20
0254060018 PINTURA ESMALTE ANTICORROSIVO TEKNO gln 49.4556 55.08
0265000101 TUBO Fo.GALV. DE 2" m 671.6400 25.25
0265050023 UNION UNIVERSAL DE Fo. GALV. DE 6" und 12.0000 304.00
0265450056 NIPLE DE F°G° DE 6" und 12.0000 89.00
0265900056 ESCALERA DE GATO DE TUBO Ø 3/4", E=2.5MM, H=2.5M und 3.0000 762.71
0271010033 TUB. FIERRO FUNDIDO BB CENT. 6" (160MM) m 10.1000 66.50
0272000107 TUBERIA PVC ISO 4422 C-10, Ø= 1 1/2" m 11,869.6100 4.80
0272050028 CURVA PVC 11.25° ISO 4435, DN=250MM und 97.0000 278.80
0272050029 CURVA PVC 22.50° ISO 4435, DN=250MM und 68.0000 278.80
0272050030 CURVA PVC 45° ISO 4435, DN=250MM und 14.0000 365.40
0272050031 CURVA PVC 11.25° ISO 4435, DN=110MM und 33.0000 49.80
0272050032 CURVA PVC 22.50° ISO 4435, DN=110MM und 35.0000 49.80
0272050033 CURVA PVC 11.25° ISO 4435, DN=315MM und 28.0000 581.40
0272050034 CURVA PVC 11.25° ISO 4435, DN=355MM und 4.0000 830.50
0272050035 CURVA PVC 22.50° ISO 4435, DN=315MM und 22.0000 581.40
0272050036 CURVA PVC 22.50° ISO 4435, DN=355MM und 3.0000 830.50
0272050037 CURVA PVC 45° ISO 4435, DN=110MM und 4.0000 40.60
0272050038 CURVA PVC 45° ISO 4435, DN=315MM und 5.0000 631.20
0272050039 CURVA PVC 45° ISO 4435, DN=355MM und 2.0000 913.60
0272070100 TEE PVC SAP 160mm x 160mm und 50.0000 92.50
0272070101 TEE PVC SAP 110mm x 110mm und 74.0000 45.60
0272070102 TEE PVC SAP 90mm x 90mm und 27.0000 31.30
Precios y cantidades de recursos requeridos por tipo
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA

META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS

MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA


UBICACIÓN: : HUARIBAMBA - TAYACAJA - HUANCAVELICA Fecha : Feb-18

Código Recurso Unidad Cantidad Precio S/.

0272070103 TEE PVC SAP 75mm x 75mm und 40.0000 21.40


0272070104 TEE PVC SAP 63mm x 63mm und 28.0000 14.20
0272080035 TUBERIA PVC ISO 4422 D=110mm C-7.5 m 1,153.4500 19.07
0272080036 TUBERIA PVC ISO 4422 D=160mm C-7.5 m 406.7600 39.69
0272080054 TUBERIA PVC ISO 4422 D=110mm C-5.0 m 3,389.3050 13.42
0272080055 TUBERIA PVC ISO 4422 D=160mm C-5 m 537.6600 28.18
0272080056 TUBERIA PVC ISO 4422 D=160mm C-10 m 222.0000 51.48
0272080057 TUBERIA PVC ISO 4422 D=110mm C-10 m 607.1600 24.65
0272080058 TUBERIA PVC ISO 4422 D=90mm C-5.0 m 5,206.8300 9.05
0272080059 TUBERIA PVC ISO 4422 D=90mm C-7.5 m 1,634.8500 12.99
0272080060 TUBERIA PVC ISO 4422 D=90mm C-10 m 300.0600 16.53
0272080061 TUBERIA PVC ISO 4422 D=75mm C-5.0 m 5,340.4100 6.71
0272080062 TUBERIA PVC ISO 4422 D=75mm C-7.5 m 1,653.6600 9.41
0272080063 TUBERIA PVC ISO 4422 D=75mm C-10 m 363.1800 11.75
0272080064 TUBERIA PVC ISO 4422 D=63mm C-5.0 m 6,106.1800 4.70
0272080065 TUBERIA PVC ISO 4422 D=63mm C-7.5 m 5,554.8000 6.47
0272080066 TUBERIA PVC ISO 4422 D=63mm C-10 m 1,765.0500 8.19
0272080067 TUBERIA PVC ISO 4422 D=63mm C-15 m 167.4574 11.50
0272080068 TUBERIA PVC ISO 4422 D=50mm C-10 m 108.0000 4.80
0272080069 TUBERIA PVC ISO 4422 D=140mm C-5.0 m 3,236.9000 21.88
0272080070 TUBERIA PVC ISO 4422 D=200mm C-5.0 m 2,160.5400 43.06
0272080071 TUBERIA PVC ISO 4422 D=200mm C-7.5 m 345.2700 62.25
0272080072 TUBERIA PVC ISO 4422 D=200mm C-10 m 241.7200 80.17
0272080073 TUBERIA PVC ISO 4422 D=140mm C-7.5 m 2,290.3900 30.86
0272080074 TUBERIA PVC ISO 4422 D=140mm C-10 m 853.9700 39.56
0272130067 TEE PVC SAP 1 1/2" x 1 1/2" und 4.0000 10.20
0272130074 TUBERIA PVC ISO 4435 DN 160MM S-25, INC./ANILLO m 8,356.4832 22.09
0272130076 TUBERIA PVC ISO 4435 DN 355MM S-25 INC./ANILLO m 186.6669 96.57
0272130083 TUBERIA PVC ISO 4435 DN 200MM S-25, INC./ANILLO m 8,416.4493 33.71
0272130089 TUBERIA PVC ISO 4435 DN 250MM S-25, INC./ANILLO m 3,985.7513 52.63
0272130091 TUBERIA PVC ISO 4435 DN 315MM S-25, INC./ANILLO m 1,487.6805 85.11
0272170100 UNION SIMPLE PVC SAP 160MM pza 37.0000 58.10
0272170101 UNION SIMPLE PVC SAP 110MM pza 23.0000 17.30
0272170102 UNION SIMPLE PVC SAP 90MM pza 23.0000 18.30
0272170103 UNION SIMPLE PVC SAP 75MM pza 29.0000 14.90
0272170104 UNION SIMPLE PVC SAP 63MM pza 45.0000 10.00
0272170105 UNION SIMPLE PVC SAP 50MM pza 18.0000 6.80
0272290002 TUBERIA PVC ISO 4435 DN 110MM S-25, INC./ANILLO m 1,688.0567 14.83
0272300081 CONO DE REBOSE PVC 90MM und 23.0000 16.60
0272300085 CODO PVC SAP Ø 6"x90° und 6.0000 66.40
0272300086 CONO DE REBOSE PVC Ø 8" a 6" und 6.0000 99.70
0272300087 CODO PVC SAL Ø 160MMx45° UF und 6.0000 58.10
0272300088 CONO DE REBOSE PVC160MM und 37.0000 54.80
0272300089 CONO DE REBOSE PVC110MM und 23.0000 19.90
0272300090 NIPLE PVC SAP DE 1"x0.30M pza 1,009.0000 3.40
0272300091 CONO DE REBOSE PVC 75MM und 29.0000 11.60
0272300092 CONO DE REBOSE PVC 63MM und 45.0000 7.50
0272300093 CONO DE REBOSE PVC 50MM und 18.0000 5.80
Precios y cantidades de recursos requeridos por tipo
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA

META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS

MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA


UBICACIÓN: : HUARIBAMBA - TAYACAJA - HUANCAVELICA Fecha : Feb-18

Código Recurso Unidad Cantidad Precio S/.

0272310002 ADAPTADOR PVC SAP 1 1/2" und 2.0000 3.30


0272310010 ADAPTADOR PVC SAP 6" und 12.0000 79.70
0272310014 ADAPTADOR PVC SAP 75MM und 124.0000 7.50
0272310015 ADAPTADOR PVC SAP 63MM und 104.0000 5.80
0272310016 ADAPTADOR PVC SAP 160MM und 124.0000 41.50
0272310017 ADAPTADOR PVC SAP 110MM und 102.0000 13.30
0272310018 ADAPTADOR PVC SAP 90MM und 62.0000 10.00
0272310020 ADAPTADOR PVC SAP 50MM und 336.0000 3.30
0272530104 CODO PVC SAP 160 mm X 90° und 77.0000 66.40
0272530105 CODO PVC SAP 90 mm X 90° und 52.0000 19.90
0272530106 CODO PVC SAP 75 mm X 90° und 73.0000 14.60
0272530108 CODO PVC SAP 63 mm X 90° und 98.0000 14.10
0272530109 CODO PVC SAP 50 mm X 90° und 41.0000 21.20
0272530120 CODO PVC SAP 110 mm X 90° und 54.0000 11.30
0272530121 CODO PVC SAP 1 1/2" und 150.0000 7.60
0272530123 CODO PVC ISO 4422 C-5.0 Ø=110MM und 44.0000 16.60
0272530125 CODO PVC SAP 2" und 14.0000 10.20
0272800011 TRANSICION PVC SAP DE 160mm pza 37.0000 41.50
0272800012 TRANSICION PVC SAP DE 110mm pza 23.0000 16.60
0272800013 TRANSICION PVC SAP DE 90mm pza 23.0000 11.60
0272800014 TRANSICION PVC SAP DE 75mm pza 38.0000 6.60
0272800015 TRANSICION PVC SAP DE 63mm pza 45.0000 5.00
0272800016 TRANSICION PVC SAP DE 50mm pza 18.0000 4.20
0272950008 CURVA PVC 11.25° ISO 4435, DN=200mm und 157.0000 215.90
0272950009 CURVA PVC 11.25° ISO 4435, DN=160mm und 172.0000 132.90
0272950010 CURVA PVC 22.50° ISO 4435, DN=200mm und 101.0000 215.90
0272950011 CURVA PVC 22.50° ISO 4435, DN=160mm und 102.0000 132.90
0272950012 CURVA PVC 45° ISO 4435, DN=160mm und 21.0000 84.70
0272950013 CURVA PVC 45° ISO 4435, DN=200mm und 12.0000 232.50
0273180020 REDUCCION PVC 160mm a 110mm und 44.0000 54.80
0273180022 REDUCCION PVC 160mm a 75mm und 2.0000 54.80
0273180024 REDUCCION PVC 110mm a90mm und 90.0000 21.60
0273180025 REDUCCION PVC 110mm a 75mm und 34.0000 21.60
0273180026 REDUCCION PVC 110mm a 63mm und 4.0000 21.60
0273180027 REDUCCION PVC 90mm a 75mm und 79.0000 14.90
0273180028 REDUCCION PVC 90mm a 63mm und 7.0000 14.90
0273180030 REDUCCION PVC 75mm a 63mm und 81.0000 8.30
0273180032 REDUCCION PVC 75mm a 1 1/2" und 94.0000 8.30
0273180033 REDUCCION PVC 63mm a 1 1/2" und 121.0000 5.80
0273180036 REDUCCION PVC 90mm a 1 1/2" und 43.0000 6.50
0273180037 REDUCCION PVC 160mm a 1 1/2" und 16.0000 54.80
0273180038 REDUCCION PVC 110mm a 1 1/2" und 22.0000 21.60
0277000011 VALVULA COMPUERTA DE BRONCE DE 6" und 6.0000 2,135.00
0277000024 VALVULA COMPUERTA DE BRONCE ISO 4422 DN 160MM und 10.0000 825.80
0278020024 VALVULA ESFERICA DE METAL DE 160MM und 37.0000 996.60
0278020025 VALVULA ESFERICA DE METAL DE 110MM und 23.0000 968.10
0278020026 VALVULA ESFERICA DE BRONCE 3" und 8.0000 569.50
0278020027 VALVULA ESFERICA DE BRONCE 2 1/2" und 22.0000 427.10
Precios y cantidades de recursos requeridos por tipo
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA

META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS

MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA


UBICACIÓN: : HUARIBAMBA - TAYACAJA - HUANCAVELICA Fecha : Feb-18

Código Recurso Unidad Cantidad Precio S/.

0278020028 VALVULA ESFERICA DE BRONCE 4" und 28.0000 968.10


0278020029 VALVULA ESFERICA DE BRONCE 6" und 25.0000 996.60
0278020030 VALVULA ESFERICA DE BRONCE 1 1/2" und 151.0000 156.60
0278020032 VALVULA DE AIRE AUTOMATICO ROSCADA DOBLE ESFERA 1" und 784.0000 284.70
0278020033 VALVULA ESFERICA DE BRONCE 2" und 29.0000 173.90
0278020034 VALVULA ESFERICA DE METAL DE 90MM und 23.0000 569.50
0278020035 VALVULA ESFERICA DE METAL DE 75MM und 29.0000 427.10
0278020036 VALVULA ESFERICA DE METAL DE 63MM und 45.0000 199.30
0278020037 VALVULA ESFERICA DE METAL DE 50MM und 18.0000 135.30
0278020038 TOMA MANOMÉTRICA CONEXIÓN ROSCA 1/8'' BSP und 756.0000 10.00
0281010009 ASPERSOR VYR 20 3.16 BARS, BOQUILLA 4.36x2.38MM und 225.0000 423.70
0281010012 VALVULA DE ACOPLE RAPIDO HDPE DE 1" und 756.0000 35.60
0281010013 VALVULA DE BOLA HDPE DE 1" und 756.0000 25.40
0281010014 COLLARIN DE DERIVACION HDPE 90MMx1" und 78.0000 12.80
0281010015 COLLARIN DE DERIVACION HDPE 75MMx1" und 129.0000 11.40
0281010016 COLLARIN DE DERIVACION HDPE 63MMx1" und 136.0000 9.20
0281010017 COLLARIN DE DERIVACION HDPE 50MMx1" und 190.0000 7.10
0281010018 COLLARIN DE DERIVACION HDPE 110MMx1" und 110.0000 15.70
0281010019 COLLARIN DE DERIVACION HDPE 160MMx1" und 113.0000 46.40
0281010021 UNION HDPE DE 1" und 28.0000 11.40
0281010022 CODO HDPE DE 1" und 225.0000 14.20
0281010023 TEE HDPE DE 1" und 150.0000 17.10
0298010089 VALVULA DE BRONCE ISO 4422 Ø=110MM und 22.0000 968.10
0299010012 INSTALACION DE CARTELES DE IDENTIFICACION und 5.0000 250.00

EQUIPOS
0337010001 HERRAMIENTAS MANUALES %MO 1.00 249,095.61
0348110004 VOLQUETE DE 10 M3 hm 40.8167 101.69
0348210005 MOTOSOLDADORA DE 250 AMPERIOS hm 746.3039 33.90
0348330091 BALDE DE PRUEBA (TUBERIA) hm 1,119.8534 12.71
0348560005 MEZCLADORA DE CONCRETO DE 9-11P3 hm 1,143.0550 8.47
0348560006 VIBRADOR DE CONCRETO 4 HP 1.50" hm 1,235.9341 8.47
0348970004 TECLE DE 4 TON. hm 9.0678 12.71
0349030004 COMPACTADOR VIBR. TIPO PLANCHA 7 HP hm 864.5268 8.47
0349030074 VIBROPISON 4.1 HP hm 15,575.0792 10.17
0349040006 CARGADOR RETROEXCAVADOR 62 HP 1 YD3 hm 1,005.3221 135.59
0349040035 TRACTOR DE ORUGAS DE 270-295 HP hm 1.6752 271.19
0349040097 MOVILIZACION EQUIPO PESADO und 3.0000 1,677.97
0349060059 PIONJER hm 19,548.5222 25.42
0349080012 ZARANDA MECANICA hm 1,376.3948 2.24

SUBCONTRATOS
0401010003 TALLER DE CAPACITACION EN PRODUCCIÓN DE PRODUCTOS AGROECOLOGICOS TALLER 2.0000 800.00
0401010004 TALLER DE CAPACITACION EN MANEJO Y USO DE PASTOS CULTIVADOS TALLER 1.0000 800.00
0401010005 TALLER DE CAPACITACION EN LA PRODUCCION DE PRODUCTOS RENTABLES EN LA ZONA TALLER 2.0000 800.00
0401010006 TALLER DE CAPACITACION EN LA INTRODUCCION DE GANADOS MEJORADOS TALLER 2.0000 800.00
Precios y cantidades de recursos requeridos por tipo
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA

META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNAC
PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS

MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA


UBICACIÓN: : HUARIBAMBA - TAYACAJA - HUANCAVELICA Fecha : Feb-18

Código Recurso Unidad Cantidad Precio S/.

0401020003 SERVICIO DE COLOCACION DE CARTEL DE OBRA und 3.0000 345.79


0402010003 ENCAUSAMIENTO DE RECURSOS DE AGUA GLB 1.0000 1,500.00
0402010004 LIMPIEZA Y REHABILITACIÓN DE AREAS AGRICOLAS Y VIAS GLB 1.0000 1,200.00
0402010005 RECUPERACIÓN DE SUELO CON FORESTACION DE PLANTONES NATIVAS GLB 1.0000 2,000.00
RESTAURACION DE AREA DE CAMPAMENTO
0402010006 GLB 1.0000 1,000.00
0402010007 MICRORELLENO SANITARIO und 4.0000 500.00
0402010008 CONTENEDOR und 5.0000 450.00
0403010029 FLETE TERRESTRE DESDE HUANCAYO A ANTA ALTA GLB 1.0000 78,994.88
0403010030 FLETE TERRESTRE DESDE HUANCAYO A ANTA BAJA GLB 1.0000 27,443.53
0403010032 FLETE TERRESTRE DESDE HUANCAYO A PICHUS GLB 1.0000 83,407.84
0403010033 FLETE RURAL ALMACEN - PIE DE OBRA (ANTA ALTA) GLB 1.0000 16,037.03
0403010034 FLETE RURAL ALMACEN - PIE DE OBRA (ANTA BAJA) GLB 1.0000 5,488.97
0403010035 FLETE RURAL ALMACEN - PIE DE OBRA (PICHUS) GLB 1.0000 14,744.32
0404010004 TALLER DE CAPACITACION EN RIEGO POR ASPERSIÓN TALLER 2.0000 800.00
0404010005 TALLER DE CAPACITACION EN CONSERVACIÓN DE SUELO TALLER 1.0000 800.00
0404010006 TALLER DE CAPACITACION EN OPERACION Y MANEJO DEL SISTEMA DE RIEGO TALLER 2.0000 800.00
0404010007 TALLER DE CAPACITACION EN USO Y MANEJO DE FERTILIZANTES TALLER 1.0000 800.00
0404010008 TALLER DE CAPACITACION PARA LA CONFORMACION DE CADENAS PRODUCTIVAS TALLER 1.0000 800.00
0404010009 TALLER DE CAPACITACION EN TEMAS DE ARTICULACION AL MERCADO TALLER 1.0000 800.00
0404010010 CONFORMACION DE ASOCIACON DE PRODUCTORES AGROPECUARIOS GLB 1.0000 500.00
0404010011 PASANTIA AL EX PROYECTO CACHI- AYACUCHO (20 PASANTES) VJE 1.0000 7,500.00
0404010012 PASANTIA AL VALLE DE URUBAMBA-CUSCO (20 PASANTES) VJE 1.0000 10,500.00

Costo del Proyecto

Monto IGV (aplicado a los materiales, equipos y servicios)


des de recursos requeridos por tipo VR 2
ACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE),
UIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
A - HUANCAVELICA

ACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE),


UIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS

Presupuestado Presupuestado
Sin/IGV S/. con/IGV S/.
MANO DE OBRA
792,153.70 792,153.70
852,391.71 852,391.71
4,157,740.00 4,157,740.00
5,802,285.41 5,802,285.41

MATERIALES
5,852.95 6,906.48
2,168.34 2,558.64
3,962.13 4,675.31
1,908.63 2,252.18
10,336.08 12,196.57
6,211.66 7,329.76
137.16 161.85
896.00 1,057.28
47.86 56.47
1.18 1.39
11.52 13.59
11.02 13.00
292,703.14 345,389.71
15,818.51 18,665.84
200,052.10 236,061.48
11,596.24 13,683.56
136,663.95 161,263.46
24,410.84 28,804.79
2,141.40 2,526.85
450.80 531.94
342.70 404.39
336.40 396.95
373.50 440.73
104.40 123.19
21,891.24 25,831.66
480,182.60 566,615.47
1,568.00 1,850.24
2,373.00 2,800.14
13,914.85 16,419.52
10,189.62 12,023.75
38,413.96 45,328.47
744.18 878.13
6,395.40 7,546.57
1,065.00 1,256.70
2,211.35 2,609.39
7,113.79 8,394.27
1,433.76 1,691.84
392.86 463.57
251.32 296.56
156,119.93 184,221.52
27,320.23 32,237.87
des de recursos requeridos por tipo VR 2
ACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE),
UIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
A - HUANCAVELICA

ACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE),


UIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS

Presupuestado Presupuestado
Sin/IGV S/. con/IGV S/.
33.90 40.00
21.36 25.20
89,926.39 106,113.14
38,956.53 45,968.71
8,355.00 9,858.90
26,938.60 31,787.55
64.64 76.28
1,782.27 2,103.08
1,112.48 1,312.73
3,457.80 4,080.20
32,208.95 38,006.56
67,104.00 79,182.72
35,229.60 41,570.93
105,601.65 124,609.95
8.80 10.38
67,963.55 80,196.99
14,938.95 17,627.96
4,957.62 5,849.99
5,084.73 5,999.98
915.24 1,079.98
135.60 160.01
19,159.00 22,607.62
2,330.90 2,750.46
762.72 900.01
315.07 371.78
36.56 43.14
2,724.01 3,214.33
16,958.91 20,011.51
3,648.00 4,304.64
1,068.00 1,260.24
2,288.13 2,699.99
671.65 792.55
56,974.13 67,229.47
27,043.60 31,911.45
18,958.40 22,370.91
5,115.60 6,036.41
1,643.40 1,939.21
1,743.00 2,056.74
16,279.20 19,209.46
3,322.00 3,919.96
12,790.80 15,093.14
2,491.50 2,939.97
162.40 191.63
3,156.00 3,724.08
1,827.20 2,156.10
4,625.00 5,457.50
3,374.40 3,981.79
845.10 997.22
des de recursos requeridos por tipo VR 2
ACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE),
UIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
A - HUANCAVELICA

ACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE),


UIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS

Presupuestado Presupuestado
Sin/IGV S/. con/IGV S/.
856.00 1,010.08
397.60 469.17
21,996.29 25,955.62
16,144.30 19,050.27
45,484.47 53,671.67
15,151.26 17,878.49
11,428.56 13,485.70
14,966.49 17,660.46
47,121.81 55,603.74
21,236.70 25,059.31
4,959.99 5,852.79
35,834.15 42,284.30
15,560.94 18,361.91
4,267.37 5,035.50
28,699.05 33,864.88
35,939.56 42,408.68
14,455.76 17,057.80
1,925.76 2,272.40
518.40 611.71
70,823.37 83,571.58
93,032.85 109,778.76
21,493.06 25,361.81
19,378.69 22,866.85
70,681.44 83,404.10
33,783.05 39,864.00
40.80 48.14
184,594.71 217,821.76
18,026.42 21,271.18
283,718.51 334,787.84
209,770.09 247,528.71
126,616.49 149,407.46
2,149.70 2,536.65
397.90 469.52
420.90 496.66
432.10 509.88
450.00 531.00
122.40 144.43
25,033.88 29,539.98
381.80 450.52
398.40 470.11
598.20 705.88
348.60 411.35
2,027.60 2,392.57
457.70 540.09
3,430.60 4,048.11
336.40 396.95
337.50 398.25
104.40 123.19
des de recursos requeridos por tipo VR 2
ACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE),
UIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
A - HUANCAVELICA

ACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE),


UIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS

Presupuestado Presupuestado
Sin/IGV S/. con/IGV S/.
6.60 7.79
956.40 1,128.55
930.00 1,097.40
603.20 711.78
5,146.00 6,072.28
1,356.60 1,600.79
620.00 731.60
1,108.80 1,308.38
5,112.80 6,033.10
1,034.80 1,221.06
1,065.80 1,257.64
1,381.80 1,630.52
869.20 1,025.66
610.20 720.04
1,140.00 1,345.20
730.40 861.87
142.80 168.50
1,535.50 1,811.89
381.80 450.52
266.80 314.82
250.80 295.94
225.00 265.50
75.60 89.21
33,896.30 39,997.63
22,858.80 26,973.38
21,805.90 25,730.96
13,555.80 15,995.84
1,778.70 2,098.87
2,790.00 3,292.20
2,411.20 2,845.22
109.60 129.33
1,944.00 2,293.92
734.40 866.59
86.40 101.95
1,177.10 1,388.98
104.30 123.07
672.30 793.31
780.20 920.64
701.80 828.12
279.50 329.81
876.80 1,034.62
475.20 560.74
12,810.00 15,115.80
8,258.00 9,744.44
36,874.20 43,511.56
22,266.30 26,274.23
4,556.00 5,376.08
9,396.20 11,087.52
des de recursos requeridos por tipo VR 2
ACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE),
UIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
A - HUANCAVELICA

ACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE),


UIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS

Presupuestado Presupuestado
Sin/IGV S/. con/IGV S/.
27,106.80 31,986.02
24,915.00 29,399.70
23,646.60 27,902.99
223,204.80 263,381.66
5,043.10 5,950.86
13,098.50 15,456.23
12,385.90 14,615.36
8,968.50 10,582.83
2,435.40 2,873.77
7,560.00 8,920.80
95,332.50 112,492.35
26,913.60 31,758.05
19,202.40 22,658.83
998.40 1,178.11
1,470.60 1,735.31
1,251.20 1,476.42
1,349.00 1,591.82
1,727.00 2,037.86
5,243.20 6,186.98
319.20 376.66
3,195.00 3,770.10
2,565.00 3,026.70
21,298.20 25,131.88
1,250.00 1,475.00
4,466,793.76 5,270,816.64

EQUIPOS
249,095.61 293,932.82
4,150.65 4,897.77
25,299.70 29,853.65
14,233.34 16,795.34
9,681.68 11,424.38
10,468.36 12,352.66
115.25 136.00
7,322.54 8,640.60
158,398.56 186,910.30
136,311.62 160,847.71
454.30 536.07
5,033.91 5,940.01
496,923.43 586,369.65
3,083.12 3,638.08
1,120,572.07 1,322,275.04

SUBCONTRATOS
1,600.00 1,888.00
800.00 944.00
1,600.00 1,888.00
1,600.00 1,888.00
des de recursos requeridos por tipo VR 2
ACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE),
UIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS,
A - HUANCAVELICA

ACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE),


UIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS

Presupuestado Presupuestado
Sin/IGV S/. con/IGV S/.
1,037.37 1,224.10
1,500.00 1,770.00
1,200.00 1,416.00
2,000.00 2,360.00
1,000.00 1,180.00
2,000.00 2,360.00
2,250.00 2,655.00
78,994.88 93,213.96
27,443.53 32,383.37
83,407.84 98,421.25
16,037.03 18,923.70
5,488.97 6,476.98
14,744.32 17,398.30
1,600.00 1,888.00
800.00 944.00
1,600.00 1,888.00
800.00 944.00
800.00 944.00
800.00 944.00
500.00 590.00
7,500.00 8,850.00
10,500.00 12,390.00
267,603.94 315,772.65

11,657,255.18 12,711,149.74

1,053,894.56
RESUMEN DEL PRESUPUESTO ANALITICO GENERAL VR 2
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE
BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE
HUARIBAMBA - TAYACAJA - HUANCAVELICA

META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE
BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE
HUARIBAMBA - TAYACAJA - HUANCAVELICA

MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA

UBICACIÓN: : HUARIBAMBA - TAYACAJA - HUANCAVELICA Fecha : Feb-18

PRESUPUESTO APROBADO
ESPECIF.
DESCRIPCION
GASTO COSTO DIRECTO COSTO DIRECTO GASTOS GASTOS DE
TOTAL
S/IGV C/IGV GENERALES SUPERVISION

2.6.2.3.4.3 COSTO DE CONST.POR ADMIN.DIRECTA - PERSONAL 5,802,285.41 5,802,285.41 0.00 0.00 5,802,285.41

2.6.2.3.4.4 COSTO DE CONSTRUC.POR ADMIN.DIRECTA - BIENES 4,466,793.76 5,270,816.64 #NAME? 3,374.47 #NAME?

2.6.2.3.4.5 COSTO DE CONST.POR ADMIN.DIRECTA - SERVICIOS 1,388,176.01 1,638,047.69 #NAME? 53,737.61 #NAME?

TOTAL S/. 11,657,255.18 12,711,149.74 #NAME? 57,112.08 #NAME?


PRESUPUESTO ANALITICO GENERAL VR2
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL
CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
COMPONENTE META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA)
DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA

UBICACIÓN : PACCARECTAMBO - PARURO - CUSCO Fecha : Feb-18

PRESUPUESTO APROBADO
COSTO
ESPECIF. PARCIAL SIN PARCIAL CON
DESCRIPCION UNIDAD COEFI. CANTIDAD UNITARIO SIN
GASTO IGV IGV COSTO GASTOS GASTOS DE
IGV TOTAL
DIRECTO GENERALES SUPERVISION

2.6.2.3.4.3 COSTO DE CONST.POR ADMIN.DIRECTA - PERSONAL 5,802,285.41 0.00 5,802,285.41

RETRIB. Y COMPLEMENT. CONTRATOS A PLAZO

OPERARIO hh 1.00 37,703.65 21.01 792,153.70 792,153.70

OFICIAL hh 1.00 50,052.36 17.03 852,391.71 852,391.71

PEON hh 1.00 271,215.92 15.33 4,157,740.00 4,157,740.00


0.00
2.6.2.3.4.4 COSTO DE CONSTRUC.POR ADMIN.DIRECTA - BIENES 4,466,793.76 #NAME? 3,374.47 #NAME?

COMBUSTIBLES Y LUBRICANTES 10,000.00

PETROLEO (SUPERVISION Y RESIDENCIA) Mes 1.00 300.00 12.50 3,750.00 4,425.00 6,250.00 3,750.00

VESTUARIO PERSONAL TECNICO 0.00 7,470.00

ZAPATOS DE SEGURIDAD CON PUNTA DE ACERO PAR 1.00 3.00 460.00 1,380.00 1,628.40 3,220.00 1,290.00

CASCOS DE SEGURIDAD BLANCO UND 1.00 3.00 50.00 150.00 177.00 350.00 120.00

POLOS CON LOGOTIPO UND 1.00 3.00 40.00 120.00 141.60 280.00 120.00

PONCHOS IMPERMEABLES UND 1.00 3.00 38.00 114.00 134.52 266.00 114.00

CASACAS IMPERMEABLES ACOLCHADAS UND 1.00 3.00 120.00 360.00 424.80 840.00 360.00

CHALECOS CON LOGO DE LA ENTIDAD UND 1.00 3.00 60.00 180.00 212.40 420.00 90.00

VESTUARIO PERSONAL OBRERO 0.00 0.00 0.00 0.00

PONCHOS Y/O CAPOTINES IMPERMEABLES UND 1.00 0.00 38.00 0.00 0.00 0.00

CHALECOS CON LOGO UND 1.00 0.00 60.00 0.00 0.00 0.00

MAMELUCOS CON LOGO UND 1.00 0.00 50.00 0.00 0.00 0.00

POLOS DE TRABAJO CON LOGO UND 1.00 0.00 20.00 0.00 0.00 0.00

CASCOS UND 1.00 0.00 20.00 0.00 0.00 0.00

GUANTES DE CUERO PAR 1.00 0.00 20.00 0.00 0.00 0.00

BOTAS DE JEBE PAR 1.00 0.00 30.00 0.00 0.00 0.00

GUANTES DE JEBE PAR 1.00 0.00 18.00 0.00 0.00 0.00

LENTES DE SEGURIDAD UND 1.00 0.00 5.00 0.00 0.00 0.00

MEDICAMENTOS 0.00 0.00 0.00 4,032.09

MEDICAMENTOS VARIOS GLB 1.00 9.00 448.01 4,032.09 4,757.87 4,032.09 0.00

MATERIALES DE ESCRITORIO 0.00 0.00 0.00 872.00

CUADERNO DE OBRAS 100 FOLIOS UND 1.00 0.00 45.00 0.00 0.00 270.00 -270.00

LAPICEROS PILOT CAJA 1.00 3.00 36.00 108.00 127.44 180.00 -72.00

PAPEL BOND A-4 DE 80 GR ATLAS MILLAR 1.00 10.00 25.00 250.00 295.00 375.00 -125.00

PAPEL BOND F- A1 80 GR PARA PLANOS MILLAR 1.00 0.00 60.03 0.00 0.00 60.03 -60.03

CUADERNOS CUADRICULADO A4 UND 1.00 2.00 5.50 11.00 12.98 99.00 -88.00

FOLDER MANILA CIENTO 1.00 2.00 25.00 50.00 59.00 75.00 -25.00

ARCHIVADORES UND 1.00 10.00 7.00 70.00 82.60 105.00 -35.00

LIBRETAS DE TOPOGRAFIA UND 1.00 10.00 5.00 50.00 59.00 75.00 -25.00

PERFORADOR UND 1.00 1.00 30.00 30.00 35.40 90.00 -60.00

ENGRAPADOR UND 1.00 1.00 45.00 45.00 53.10 135.00 -90.00

PARTES DIARIOS DE MAQUINARIA (BLOCK DE 50) BLOCK 1.00 0.00 35.00 0.00 0.00 1,400.00 -1,400.00

GRAPAS CAJA 1.00 1.00 10.00 10.00 11.80 30.00 -20.00

CD UND 1.00 50.00 1.00 50.00 59.00 30.00 20.00

LAPIZ PORTAMINA UND 1.00 3.00 5.00 15.00 17.70 50.00 -35.00

STUCHE DE LAPIZ UND 1.00 2.00 1.50 3.00 3.54 7.50 -4.50

USB DE 8GB UND 1.00 3.00 60.00 180.00 212.40 360.00 -180.00

EQUIPAMIENTO Y BIENES DURADEROS #NAME? #NAME? #NAME? #NAME?


PRESUPUESTO ANALITICO GENERAL VR2
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL
CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
COMPONENTE META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA)
DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA

UBICACIÓN : PACCARECTAMBO - PARURO - CUSCO Fecha : Feb-18

PRESUPUESTO APROBADO
COSTO
ESPECIF. PARCIAL SIN PARCIAL CON
DESCRIPCION UNIDAD COEFI. CANTIDAD UNITARIO SIN
GASTO IGV IGV COSTO GASTOS GASTOS DE
IGV TOTAL
DIRECTO GENERALES SUPERVISION

#NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME?

MATERIALES DE CONSTRUCCION 4,466,793.76

LUBRICANTE gln 1.00 172.65 33.90 5,852.95 6,906.48 5,852.95

CLAVOS PARA MADERA C/C 2 1/2" kg 1.00 639.63 3.39 2,168.34 2,558.64 2,168.34

CLAVOS PARA MADERA C/C 3" kg 1.00 1,168.77 3.39 3,962.13 4,675.31 3,962.13

CLAVOS PARA MADERA C/C 4" kg 1.00 563.02 3.39 1,908.63 2,252.18 1,908.63

ALAMBRE NEGRO N°16 kg 1.00 3,048.99 3.39 10,336.08 12,196.57 10,336.08

ALAMBRE NEGRO N°8 kg 1.00 1,832.35 3.39 6,211.66 7,329.76 6,211.66

PERNOS HEXAGONALES DE 3/4" x 3 1/2" pza 1.00 27.00 5.08 137.16 161.85 137.16

PERNO HEXAGONAL P/BRIDA DE 6" INC.TUERCA und 1.00 70.00 12.80 896.00 1,057.28 896.00

POLEA METALICA DE DIAMETRO 3" X 1/2" und 1.00 2.00 23.93 47.86 56.47 47.86

PERNOS CON TUERCAS 1" X 1 1/4" und 1.00 2.00 0.59 1.18 1.39 1.18

PERNOS PARA GRAPAS 1/2" x 2 " und 1.00 2.00 5.76 11.52 13.59 11.52

GRAPAS 1/2" x 2" und 1.00 2.00 5.51 11.02 13.00 11.02

ACERO DE REFUERZO FY=4200 GRADO 60 kg 1.00 91,469.73 3.20 292,703.14 345,389.71 292,703.14

ARENA FINA m3 1.00 143.58 110.17 15,818.51 18,665.84 15,818.51

PIEDRA CHANCADA DE 3/4" m3 1.00 1,815.85 110.17 200,052.10 236,061.48 200,052.10

AFIRMADO PREPARADO m3 1.00 136.83 84.75 11,596.24 13,683.56 11,596.24

ARENA GRUESA m3 1.00 1,343.93 101.69 136,663.95 161,263.46 136,663.95

PIEDRA GRANDE m3 1.00 303.20 80.51 24,410.84 28,804.79 24,410.84

CANASTILLA PVC SAP DE 160mm und 1.00 43.00 49.80 2,141.40 2,526.85 2,141.40

CANASTILLA PVC SAP DE 110mm und 1.00 23.00 19.60 450.80 531.94 450.80

CANASTILLA PVC SAP DE 90mm und 1.00 23.00 14.90 342.70 404.39 342.70

CANASTILLA PVC SAP DE 75mm und 1.00 29.00 11.60 336.40 396.95 336.40

CANASTILLA PVC SAP DE 63mm und 1.00 45.00 8.30 373.50 440.73 373.50

CANASTILLA PVC SAP DE 50mm und 1.00 18.00 5.80 104.40 123.19 104.40

DINATRID (GEL) gln 1.00 178.15 122.88 21,891.24 25,831.66 21,891.24

CEMENTO PORTLAND TIPO I (42.5KG) BOL 1.00 24,009.13 20.00 480,182.60 566,615.47 480,182.60

REJILLA METALICA (0.56x0.70) und 1.00 10.00 156.80 1,568.00 1,850.24 1,568.00

TAPA METALICA (0.60x0.60M) und 1.00 10.00 237.30 2,373.00 2,800.14 2,373.00

MECHA NARANJA m 1.00 10,956.58 1.27 13,914.85 16,419.52 13,914.85

FULMINANTE und 1.00 10,956.58 0.93 10,189.62 12,023.75 10,189.62

DINAMITA kg 1.00 12,041.99 3.19 38,413.96 45,328.47 38,413.96

YESO EN BOLSAS DE 25 KG. BOL 1.00 117.01 6.36 744.18 878.13 744.18

CANASTILLA DE BRONCE 110MM und 1.00 11.00 581.40 6,395.40 7,546.57 6,395.40

ACOPLE DE MANGUERA A MANGUERA HDPE DE 1" und 1.00 150.00 7.10 1,065.00 1,256.70 1,065.00

WATER STOP PVC DE 6" m 1.00 173.99 12.71 2,211.35 2,609.39 2,211.35

ELECTRODOS (SOLDADURA CELLOCORD 3/16") kg 1.00 559.70 12.71 7,113.79 8,394.27 7,113.79

PEGAMENTO PVC DE ALTA PRESION gln 1.00 16.92 84.75 1,433.76 1,691.84 1,433.76

CABLE DE ACERO DE Ø 1/2" TIPO BOA m 1.00 18.54 21.19 392.86 463.57 392.86

CABLE DE ACERO DE Ø 1/4" TIPO BOA m 1.00 16.48 15.25 251.32 296.56 251.32

BARRENO 5' X 1/8" und 1.00 409.59 381.16 156,119.93 184,221.52 156,119.93

CHEMALAC Y DISOLVENTE gln 1.00 153.51 177.97 27,320.23 32,237.87 27,320.23

TEMPLADOR DE ACERO Ø 1/2" und 1.00 2.00 16.95 33.90 40.00 33.90
PRESUPUESTO ANALITICO GENERAL VR2
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL
CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
COMPONENTE META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA)
DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA

UBICACIÓN : PACCARECTAMBO - PARURO - CUSCO Fecha : Feb-18

PRESUPUESTO APROBADO
COSTO
ESPECIF. PARCIAL SIN PARCIAL CON
DESCRIPCION UNIDAD COEFI. CANTIDAD UNITARIO SIN
GASTO IGV IGV COSTO GASTOS GASTOS DE
IGV TOTAL
DIRECTO GENERALES SUPERVISION

JUNTA INPER WATER STOP NEOPRENE 9" m 1.00 1.26 16.95 21.36 25.20 21.36

JUNTA INPER WATER STOP PVC 6" m 1.00 2,187.99 41.10 89,926.39 106,113.14 89,926.39

IMPERMEABILIZANTE (CHEMA 1 O SIMILAR) gln 1.00 218.89 177.97 38,956.53 45,968.71 38,956.53

MANGUERA HDPE DE 32MMx80M und 1.00 75.00 111.40 8,355.00 9,858.90 8,355.00

HORMIGON m3 1.00 276.41 97.46 26,938.60 31,787.55 26,938.60

EMPAQUETADURA DE JEBE ENLONADO DE 6" und 1.00 5.05 12.80 64.64 76.28 64.64

AGUA m3 1.00 4,243.49 0.42 1,782.27 2,103.08 1,782.27

CARTEL DE OBRA SEGUN DISEÑO (GIGANTOGRAFIA) m2 1.00 52.50 21.19 1,112.48 1,312.73 1,112.48

TAPA METALICA DE 0.80x0.80M, e= 1/8" und 1.00 17.00 203.40 3,457.80 4,080.20 3,457.80

TAPA METALICA DE 0.70x0.70M, e=1/8" und 1.00 181.00 177.95 32,208.95 38,006.56 32,208.95

TAPA METALICA DE 0.50x0.50M, e=1/8" und 1.00 466.00 144.00 67,104.00 79,182.72 67,104.00

TAPA METALICA DE (0.30x0.30M), e=1/8" und 1.00 756.00 46.60 35,229.60 41,570.93 35,229.60

MADERA TORNILLO p2 1.00 22,661.30 4.66 105,601.65 124,609.95 105,601.65

REGLA DE MADERA p2 1.00 1.60 5.51 8.80 10.38 8.80

TRIPLAY DE 4'x8'x 19 mm pln 1.00 641.59 105.93 67,963.55 80,196.99 67,963.55

MALLA DE ALAMB.GALV.# 12,COC. 2" X 2" m2 1.00 1,175.37 12.71 14,938.95 17,627.96 14,938.95
COMPUERTA METALICA CON IZAJE 0.50x0.50, H=4.00m
und 1.00 3.00 1,652.54 4,957.62 5,849.99 4,957.62
(SEGUN DISEÑO)
COMPUERTA METALICA CON IZAJE 0.50x0.70, H=4.00m
und 1.00 3.00 1,694.91 5,084.73 5,999.98 5,084.73
(SEGUN DISEÑO)
COMPUERTA METALICA DE 0.30x0.30 M, H=1.30 und 1.00 3.00 305.08 915.24 1,079.98 915.24

PLATINA 1" X 1/8" m 1.00 40.00 3.39 135.60 160.01 135.60

REJILLA METALICA (0.35x0.35M) und 1.00 238.00 80.50 19,159.00 22,607.62 19,159.00

REJILLA METALICA (0.80x1.00M) und 1.00 11.00 211.90 2,330.90 2,750.46 2,330.90

REJILLA METALICA 2.00m x 0.60m x 1", ESP. = 1" und 1.00 3.00 254.24 762.72 900.01 762.72

THINER gln 1.00 24.79 12.71 315.07 371.78 315.07

PINTURA ESMALTE SINTETICO gln 1.00 1.14 32.20 36.56 43.14 36.56

PINTURA ESMALTE ANTICORROSIVO TEKNO gln 1.00 49.46 55.08 2,724.01 3,214.33 2,724.01

TUBO Fo.GALV. DE 2" m 1.00 671.64 25.25 16,958.91 20,011.51 16,958.91

UNION UNIVERSAL DE Fo. GALV. DE 6" und 1.00 12.00 304.00 3,648.00 4,304.64 3,648.00

NIPLE DE F°G° DE 6" und 1.00 12.00 89.00 1,068.00 1,260.24 1,068.00

ESCALERA DE GATO DE TUBO Ø 3/4", E=2.5MM, H=2.5M und 1.00 3.00 762.71 2,288.13 2,699.99 2,288.13

TUB. FIERRO FUNDIDO BB CENT. 6" (160MM) m 1.00 10.10 66.50 671.65 792.55 671.65

TUBERIA PVC ISO 4422 C-10, Ø= 1 1/2" m 1.00 11,869.61 4.80 56,974.13 67,229.47 56,974.13

CURVA PVC 11.25° ISO 4435, DN=250MM und 1.00 97.00 278.80 27,043.60 31,911.45 27,043.60

CURVA PVC 22.50° ISO 4435, DN=250MM und 1.00 68.00 278.80 18,958.40 22,370.91 18,958.40

CURVA PVC 45° ISO 4435, DN=250MM und 1.00 14.00 365.40 5,115.60 6,036.41 5,115.60

CURVA PVC 11.25° ISO 4435, DN=110MM und 1.00 33.00 49.80 1,643.40 1,939.21 1,643.40

CURVA PVC 22.50° ISO 4435, DN=110MM und 1.00 35.00 49.80 1,743.00 2,056.74 1,743.00

CURVA PVC 11.25° ISO 4435, DN=315MM und 1.00 28.00 581.40 16,279.20 19,209.46 16,279.20

CURVA PVC 11.25° ISO 4435, DN=355MM und 1.00 4.00 830.50 3,322.00 3,919.96 3,322.00

CURVA PVC 22.50° ISO 4435, DN=315MM und 1.00 22.00 581.40 12,790.80 15,093.14 12,790.80

CURVA PVC 22.50° ISO 4435, DN=355MM und 1.00 3.00 830.50 2,491.50 2,939.97 2,491.50

CURVA PVC 45° ISO 4435, DN=110MM und 1.00 4.00 40.60 162.40 191.63 162.40

CURVA PVC 45° ISO 4435, DN=315MM und 1.00 5.00 631.20 3,156.00 3,724.08 3,156.00

CURVA PVC 45° ISO 4435, DN=355MM und 1.00 2.00 913.60 1,827.20 2,156.10 1,827.20

TEE PVC SAP 160mm x 160mm und 1.00 50.00 92.50 4,625.00 5,457.50 4,625.00

TEE PVC SAP 110mm x 110mm und 1.00 74.00 45.60 3,374.40 3,981.79 3,374.40
PRESUPUESTO ANALITICO GENERAL VR2
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL
CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
COMPONENTE META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA)
DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA

UBICACIÓN : PACCARECTAMBO - PARURO - CUSCO Fecha : Feb-18

PRESUPUESTO APROBADO
COSTO
ESPECIF. PARCIAL SIN PARCIAL CON
DESCRIPCION UNIDAD COEFI. CANTIDAD UNITARIO SIN
GASTO IGV IGV COSTO GASTOS GASTOS DE
IGV TOTAL
DIRECTO GENERALES SUPERVISION

TEE PVC SAP 90mm x 90mm und 1.00 27.00 31.30 845.10 997.22 845.10

TEE PVC SAP 75mm x 75mm und 1.00 40.00 21.40 856.00 1,010.08 856.00

TEE PVC SAP 63mm x 63mm und 1.00 28.00 14.20 397.60 469.17 397.60

TUBERIA PVC ISO 4422 D=110mm C-7.5 m 1.00 1,153.45 19.07 21,996.29 25,955.62 21,996.29

TUBERIA PVC ISO 4422 D=160mm C-7.5 m 1.00 406.76 39.69 16,144.30 19,050.27 16,144.30

TUBERIA PVC ISO 4422 D=110mm C-5.0 m 1.00 3,389.31 13.42 45,484.47 53,671.67 45,484.47

TUBERIA PVC ISO 4422 D=160mm C-5 m 1.00 537.66 28.18 15,151.26 17,878.49 15,151.26

TUBERIA PVC ISO 4422 D=160mm C-10 m 1.00 222.00 51.48 11,428.56 13,485.70 11,428.56

TUBERIA PVC ISO 4422 D=110mm C-10 m 1.00 607.16 24.65 14,966.49 17,660.46 14,966.49

TUBERIA PVC ISO 4422 D=90mm C-5.0 m 1.00 5,206.83 9.05 47,121.81 55,603.74 47,121.81

TUBERIA PVC ISO 4422 D=90mm C-7.5 m 1.00 1,634.85 12.99 21,236.70 25,059.31 21,236.70

TUBERIA PVC ISO 4422 D=90mm C-10 m 1.00 300.06 16.53 4,959.99 5,852.79 4,959.99

TUBERIA PVC ISO 4422 D=75mm C-5.0 m 1.00 5,340.41 6.71 35,834.15 42,284.30 35,834.15

TUBERIA PVC ISO 4422 D=75mm C-7.5 m 1.00 1,653.66 9.41 15,560.94 18,361.91 15,560.94

TUBERIA PVC ISO 4422 D=75mm C-10 m 1.00 363.18 11.75 4,267.37 5,035.50 4,267.37

TUBERIA PVC ISO 4422 D=63mm C-5.0 m 1.00 6,106.18 4.70 28,699.05 33,864.88 28,699.05

TUBERIA PVC ISO 4422 D=63mm C-7.5 m 1.00 5,554.80 6.47 35,939.56 42,408.68 35,939.56

TUBERIA PVC ISO 4422 D=63mm C-10 m 1.00 1,765.05 8.19 14,455.76 17,057.80 14,455.76

TUBERIA PVC ISO 4422 D=63mm C-15 m 1.00 167.46 11.50 1,925.76 2,272.40 1,925.76

TUBERIA PVC ISO 4422 D=50mm C-10 m 1.00 108.00 4.80 518.40 611.71 518.40

TUBERIA PVC ISO 4422 D=140mm C-5.0 m 1.00 3,236.90 21.88 70,823.37 83,571.58 70,823.37

TUBERIA PVC ISO 4422 D=200mm C-5.0 m 1.00 2,160.54 43.06 93,032.85 109,778.76 93,032.85

TUBERIA PVC ISO 4422 D=200mm C-7.5 m 1.00 345.27 62.25 21,493.06 25,361.81 21,493.06

TUBERIA PVC ISO 4422 D=200mm C-10 m 1.00 241.72 80.17 19,378.69 22,866.85 19,378.69

TUBERIA PVC ISO 4422 D=140mm C-7.5 m 1.00 2,290.39 30.86 70,681.44 83,404.10 70,681.44

TUBERIA PVC ISO 4422 D=140mm C-10 m 1.00 853.97 39.56 33,783.05 39,864.00 33,783.05

TEE PVC SAP 1 1/2" x 1 1/2" und 1.00 4.00 10.20 40.80 48.14 40.80

TUBERIA PVC ISO 4435 DN 160MM S-25, INC./ANILLO m 1.00 8,356.48 22.09 184,594.71 217,821.76 184,594.71

TUBERIA PVC ISO 4435 DN 355MM S-25 INC./ANILLO m 1.00 186.67 96.57 18,026.42 21,271.18 18,026.42

TUBERIA PVC ISO 4435 DN 200MM S-25, INC./ANILLO m 1.00 8,416.45 33.71 283,718.51 334,787.84 283,718.51

TUBERIA PVC ISO 4435 DN 250MM S-25, INC./ANILLO m 1.00 3,985.75 52.63 209,770.09 247,528.71 209,770.09

TUBERIA PVC ISO 4435 DN 315MM S-25, INC./ANILLO m 1.00 1,487.68 85.11 126,616.49 149,407.46 126,616.49

UNION SIMPLE PVC SAP 160MM pza 1.00 37.00 58.10 2,149.70 2,536.65 2,149.70

UNION SIMPLE PVC SAP 110MM pza 1.00 23.00 17.30 397.90 469.52 397.90

UNION SIMPLE PVC SAP 90MM pza 1.00 23.00 18.30 420.90 496.66 420.90

UNION SIMPLE PVC SAP 75MM pza 1.00 29.00 14.90 432.10 509.88 432.10

UNION SIMPLE PVC SAP 63MM pza 1.00 45.00 10.00 450.00 531.00 450.00

UNION SIMPLE PVC SAP 50MM pza 1.00 18.00 6.80 122.40 144.43 122.40

TUBERIA PVC ISO 4435 DN 110MM S-25, INC./ANILLO m 1.00 1,688.06 14.83 25,033.88 29,539.98 25,033.88

CONO DE REBOSE PVC 90MM und 1.00 23.00 16.60 381.80 450.52 381.80

CODO PVC SAP Ø 6"x90° und 1.00 6.00 66.40 398.40 470.11 398.40

CONO DE REBOSE PVC Ø 8" a 6" und 1.00 6.00 99.70 598.20 705.88 598.20

CODO PVC SAL Ø 160MMx45° UF und 1.00 6.00 58.10 348.60 411.35 348.60

CONO DE REBOSE PVC160MM und 1.00 37.00 54.80 2,027.60 2,392.57 2,027.60

CONO DE REBOSE PVC110MM und 1.00 23.00 19.90 457.70 540.09 457.70

NIPLE PVC SAP DE 1"x0.30M pza 1.00 1,009.00 3.40 3,430.60 4,048.11 3,430.60
PRESUPUESTO ANALITICO GENERAL VR2
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL
CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
COMPONENTE META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA)
DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA

UBICACIÓN : PACCARECTAMBO - PARURO - CUSCO Fecha : Feb-18

PRESUPUESTO APROBADO
COSTO
ESPECIF. PARCIAL SIN PARCIAL CON
DESCRIPCION UNIDAD COEFI. CANTIDAD UNITARIO SIN
GASTO IGV IGV COSTO GASTOS GASTOS DE
IGV TOTAL
DIRECTO GENERALES SUPERVISION

CONO DE REBOSE PVC 75MM und 1.00 29.00 11.60 336.40 396.95 336.40

CONO DE REBOSE PVC 63MM und 1.00 45.00 7.50 337.50 398.25 337.50

CONO DE REBOSE PVC 50MM und 1.00 18.00 5.80 104.40 123.19 104.40

ADAPTADOR PVC SAP 1 1/2" und 1.00 2.00 3.30 6.60 7.79 6.60

ADAPTADOR PVC SAP 6" und 1.00 12.00 79.70 956.40 1,128.55 956.40

ADAPTADOR PVC SAP 75MM und 1.00 124.00 7.50 930.00 1,097.40 930.00

ADAPTADOR PVC SAP 63MM und 1.00 104.00 5.80 603.20 711.78 603.20

ADAPTADOR PVC SAP 160MM und 1.00 124.00 41.50 5,146.00 6,072.28 5,146.00

ADAPTADOR PVC SAP 110MM und 1.00 102.00 13.30 1,356.60 1,600.79 1,356.60

ADAPTADOR PVC SAP 90MM und 1.00 62.00 10.00 620.00 731.60 620.00

ADAPTADOR PVC SAP 50MM und 1.00 336.00 3.30 1,108.80 1,308.38 1,108.80

CODO PVC SAP 160 mm X 90° und 1.00 77.00 66.40 5,112.80 6,033.10 5,112.80

CODO PVC SAP 90 mm X 90° und 1.00 52.00 19.90 1,034.80 1,221.06 1,034.80

CODO PVC SAP 75 mm X 90° und 1.00 73.00 14.60 1,065.80 1,257.64 1,065.80

CODO PVC SAP 63 mm X 90° und 1.00 98.00 14.10 1,381.80 1,630.52 1,381.80

CODO PVC SAP 50 mm X 90° und 1.00 41.00 21.20 869.20 1,025.66 869.20

CODO PVC SAP 110 mm X 90° und 1.00 54.00 11.30 610.20 720.04 610.20

CODO PVC SAP 1 1/2" und 1.00 150.00 7.60 1,140.00 1,345.20 1,140.00

CODO PVC ISO 4422 C-5.0 Ø=110MM und 1.00 44.00 16.60 730.40 861.87 730.40

CODO PVC SAP 2" und 1.00 14.00 10.20 142.80 168.50 142.80

TRANSICION PVC SAP DE 160mm pza 1.00 37.00 41.50 1,535.50 1,811.89 1,535.50

TRANSICION PVC SAP DE 110mm pza 1.00 23.00 16.60 381.80 450.52 381.80

TRANSICION PVC SAP DE 90mm pza 1.00 23.00 11.60 266.80 314.82 266.80

TRANSICION PVC SAP DE 75mm pza 1.00 38.00 6.60 250.80 295.94 250.80

TRANSICION PVC SAP DE 63mm pza 1.00 45.00 5.00 225.00 265.50 225.00

TRANSICION PVC SAP DE 50mm pza 1.00 18.00 4.20 75.60 89.21 75.60

CURVA PVC 11.25° ISO 4435, DN=200mm und 1.00 157.00 215.90 33,896.30 39,997.63 33,896.30

CURVA PVC 11.25° ISO 4435, DN=160mm und 1.00 172.00 132.90 22,858.80 26,973.38 22,858.80

CURVA PVC 22.50° ISO 4435, DN=200mm und 1.00 101.00 215.90 21,805.90 25,730.96 21,805.90

CURVA PVC 22.50° ISO 4435, DN=160mm und 1.00 102.00 132.90 13,555.80 15,995.84 13,555.80

CURVA PVC 45° ISO 4435, DN=160mm und 1.00 21.00 84.70 1,778.70 2,098.87 1,778.70

CURVA PVC 45° ISO 4435, DN=200mm und 1.00 12.00 232.50 2,790.00 3,292.20 2,790.00

REDUCCION PVC 160mm a 110mm und 1.00 44.00 54.80 2,411.20 2,845.22 2,411.20

REDUCCION PVC 160mm a 75mm und 1.00 2.00 54.80 109.60 129.33 109.60

REDUCCION PVC 110mm a90mm und 1.00 90.00 21.60 1,944.00 2,293.92 1,944.00

REDUCCION PVC 110mm a 75mm und 1.00 34.00 21.60 734.40 866.59 734.40

REDUCCION PVC 110mm a 63mm und 1.00 4.00 21.60 86.40 101.95 86.40

REDUCCION PVC 90mm a 75mm und 1.00 79.00 14.90 1,177.10 1,388.98 1,177.10

REDUCCION PVC 90mm a 63mm und 1.00 7.00 14.90 104.30 123.07 104.30

REDUCCION PVC 75mm a 63mm und 1.00 81.00 8.30 672.30 793.31 672.30

REDUCCION PVC 75mm a 1 1/2" und 1.00 94.00 8.30 780.20 920.64 780.20

REDUCCION PVC 63mm a 1 1/2" und 1.00 121.00 5.80 701.80 828.12 701.80

REDUCCION PVC 90mm a 1 1/2" und 1.00 43.00 6.50 279.50 329.81 279.50

REDUCCION PVC 160mm a 1 1/2" und 1.00 16.00 54.80 876.80 1,034.62 876.80

REDUCCION PVC 110mm a 1 1/2" und 1.00 22.00 21.60 475.20 560.74 475.20

VALVULA COMPUERTA DE BRONCE DE 6" und 1.00 6.00 2,135.00 12,810.00 15,115.80 12,810.00
PRESUPUESTO ANALITICO GENERAL VR2
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL
CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
COMPONENTE META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA)
DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA

UBICACIÓN : PACCARECTAMBO - PARURO - CUSCO Fecha : Feb-18

PRESUPUESTO APROBADO
COSTO
ESPECIF. PARCIAL SIN PARCIAL CON
DESCRIPCION UNIDAD COEFI. CANTIDAD UNITARIO SIN
GASTO IGV IGV COSTO GASTOS GASTOS DE
IGV TOTAL
DIRECTO GENERALES SUPERVISION

VALVULA COMPUERTA DE BRONCE ISO 4422 DN 160MM und 1.00 10.00 825.80 8,258.00 9,744.44 8,258.00

VALVULA ESFERICA DE METAL DE 160MM und 1.00 37.00 996.60 36,874.20 43,511.56 36,874.20

VALVULA ESFERICA DE METAL DE 110MM und 1.00 23.00 968.10 22,266.30 26,274.23 22,266.30

VALVULA ESFERICA DE BRONCE 3" und 1.00 8.00 569.50 4,556.00 5,376.08 4,556.00

VALVULA ESFERICA DE BRONCE 2 1/2" und 1.00 22.00 427.10 9,396.20 11,087.52 9,396.20

VALVULA ESFERICA DE BRONCE 4" und 1.00 28.00 968.10 27,106.80 31,986.02 27,106.80

VALVULA ESFERICA DE BRONCE 6" und 1.00 25.00 996.60 24,915.00 29,399.70 24,915.00

VALVULA ESFERICA DE BRONCE 1 1/2" und 1.00 151.00 156.60 23,646.60 27,902.99 23,646.60
VALVULA DE AIRE AUTOMATICO ROSCADA DOBLE ESFERA
und 1.00 784.00 284.70 223,204.80 263,381.66 223,204.80
1"
VALVULA ESFERICA DE BRONCE 2" und 1.00 29.00 173.90 5,043.10 5,950.86 5,043.10

VALVULA ESFERICA DE METAL DE 90MM und 1.00 23.00 569.50 13,098.50 15,456.23 13,098.50

VALVULA ESFERICA DE METAL DE 75MM und 1.00 29.00 427.10 12,385.90 14,615.36 12,385.90

VALVULA ESFERICA DE METAL DE 63MM und 1.00 45.00 199.30 8,968.50 10,582.83 8,968.50

VALVULA ESFERICA DE METAL DE 50MM und 1.00 18.00 135.30 2,435.40 2,873.77 2,435.40

TOMA MANOMÉTRICA CONEXIÓN ROSCA 1/8'' BSP und 1.00 756.00 10.00 7,560.00 8,920.80 7,560.00

ASPERSOR VYR 20 3.16 BARS, BOQUILLA 4.36x2.38MM und 1.00 225.00 423.70 95,332.50 112,492.35 95,332.50

VALVULA DE ACOPLE RAPIDO HDPE DE 1" und 1.00 756.00 35.60 26,913.60 31,758.05 26,913.60

VALVULA DE BOLA HDPE DE 1" und 1.00 756.00 25.40 19,202.40 22,658.83 19,202.40

COLLARIN DE DERIVACION HDPE 90MMx1" und 1.00 78.00 12.80 998.40 1,178.11 998.40

COLLARIN DE DERIVACION HDPE 75MMx1" und 1.00 129.00 11.40 1,470.60 1,735.31 1,470.60

COLLARIN DE DERIVACION HDPE 63MMx1" und 1.00 136.00 9.20 1,251.20 1,476.42 1,251.20

COLLARIN DE DERIVACION HDPE 50MMx1" und 1.00 190.00 7.10 1,349.00 1,591.82 1,349.00

COLLARIN DE DERIVACION HDPE 110MMx1" und 1.00 110.00 15.70 1,727.00 2,037.86 1,727.00

COLLARIN DE DERIVACION HDPE 160MMx1" und 1.00 113.00 46.40 5,243.20 6,186.98 5,243.20

UNION HDPE DE 1" und 1.00 28.00 11.40 319.20 376.66 319.20

CODO HDPE DE 1" und 1.00 225.00 14.20 3,195.00 3,770.10 3,195.00

TEE HDPE DE 1" und 1.00 150.00 17.10 2,565.00 3,026.70 2,565.00

VALVULA DE BRONCE ISO 4422 Ø=110MM und 1.00 22.00 968.10 21,298.20 25,131.88 21,298.20

INSTALACION DE CARTELES DE IDENTIFICACION und 1.00 5.00 250.00 1,250.00 1,475.00 1,250.00

2.6.2.3.4.5 COSTO DE CONST.POR ADMIN.DIRECTA - SERVICIOS 1,388,176.01 #NAME? 53,737.61 #NAME?

LOCACION DE SERVICIOS RESIDENCIA #NAME?

RESIDENTE DE OBRA MES 1.00 4.00 6,000.00 24,000.00 24,000.00

PAGO ASISTENTE TECNICO MES 1.00 4.00 3,000.00 12,000.00 12,000.00

#NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME?

PAGO ASISTENTE ADMINISTRATIVO MES 1.00 4.00 2,500.00 10,000.00 10,000.00

PAGO MAESTRO DE OBRA MES 1.00 4.00 3,000.00 12,000.00 12,000.00

GUARDIAN DE OBRA MES 1.00 4.00 2,000.00 8,000.00 8,000.00

ALMACENERO MES 1.00 4.00 2,000.00 8,000.00 8,000.00

SERVICIOS DE NOTARIO GLB 1.00 1.00 1,500.00 1,500.00 1,500.00

#NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME?

SECRETARIA MES 1.00 4.00 2,200.00 8,800.00 8,800.00

CHOFER MES 1.00 4.00 2,000.00 8,000.00 8,000.00

INGENIERO DE SEGURIDAD MES 1.00 4.00 3,500.00 14,000.00 14,000.00

LOCACION DE SERVICIOS SUPERVISION 0.00 46,000.00


PRESUPUESTO ANALITICO GENERAL VR2
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL
CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
COMPONENTE META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA)
DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA

UBICACIÓN : PACCARECTAMBO - PARURO - CUSCO Fecha : Feb-18

PRESUPUESTO APROBADO
COSTO
ESPECIF. PARCIAL SIN PARCIAL CON
DESCRIPCION UNIDAD COEFI. CANTIDAD UNITARIO SIN
GASTO IGV IGV COSTO GASTOS GASTOS DE
IGV TOTAL
DIRECTO GENERALES SUPERVISION

PAGO SUPERVISOR EXTERNO MES 1.00 4.00 6,500.00 26,000.00 26,000.00

PAGO ASISTENTE DE SUPERVISION MES 1.00 4.00 3,000.00 12,000.00 12,000.00

0 MES 1.00 4.00 2,000.00 8,000.00 8,000.00

VIATICOS Y ASIGNACIONES 0.00 0.00 4,000.00

PERSONAL PESC SEDE CUSCO Mes 1.00 4.00 1,000.00 4,000.00 4,000.00

OTROS SERVICIOS DE TERCEROS 0.00 0.00 #NAME?

DISEÑO DE MEZCLA Y ROTURA DE PROBETAS UND 1.00 0.00 2,500.00 0.00 0.00 0.00

ESTUDIO DE MECANICA DE SUELOS UND 1.00 0.00 3,000.00 0.00 0.00 0.00
SERVICIO DE VERIFICACION DE DENSIDAD DE
UND 1.00 4.00 85.00 340.00 401.20 340.00
COMPACTACION
ALQUILER DE CAMIONETA 4X4 DOBLE CABINA Y DOBLE
MES 1.00 1.00 7,500.00 7,500.00 8,850.00 7,500.00
TRACCION
LEGALIZACION DE CUADERNO DE OBRA UND 1.00 0.00 50.00 0.00 0.00 0.00

#NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME?

ALQUILER DE LOCAL PARA OFICINA Y ALMACEN MES 1.00 4.00 540.00 2,160.00 2,548.80 2,160.00

SERVICIO DE ALIMENTACION DE PERSONAL TECNICO MES 1.00 4.00 1,934.40 7,737.61 9,130.38 7,737.61
TALLER DE CAPACITACION EN PRODUCCIÓN DE
TALLER 1.00 2.00 800.00 1,600.00 1,888.00 1,600.00
PRODUCTOS AGROECOLOGICOS
TALLER DE CAPACITACION EN MANEJO Y USO DE PASTOS
TALLER 1.00 1.00 800.00 800.00 944.00 800.00
CULTIVADOS
TALLER DE CAPACITACION EN LA PRODUCCION DE
TALLER 1.00 2.00 800.00 1,600.00 1,888.00 1,600.00
PRODUCTOS RENTABLES EN LA ZONA
TALLER DE CAPACITACION EN LA INTRODUCCION DE
TALLER 1.00 2.00 800.00 1,600.00 1,888.00 1,600.00
GANADOS MEJORADOS
SERVICIO DE COLOCACION DE CARTEL DE OBRA und 1.00 3.00 345.79 1,037.37 1,224.10 1,037.37

ENCAUSAMIENTO DE RECURSOS DE AGUA GLB 1.00 1.00 1,500.00 1,500.00 1,770.00 1,500.00

LIMPIEZA Y REHABILITACIÓN DE AREAS AGRICOLAS Y VIAS GLB 1.00 1.00 1,200.00 1,200.00 1,416.00 1,200.00
RECUPERACIÓN DE SUELO CON FORESTACION DE
GLB 1.00 1.00 2,000.00 2,000.00 2,360.00 2,000.00
PLANTONES NATIVAS
RESTAURACION DE AREA DE CAMPAMENTO
GLB 1.00 1.00 1,000.00 1,000.00 1,180.00 1,000.00

MICRORELLENO SANITARIO und 1.00 4.00 500.00 2,000.00 2,360.00 2,000.00

CONTENEDOR und 1.00 5.00 450.00 2,250.00 2,655.00 2,250.00

FLETE TERRESTRE DESDE HUANCAYO A ANTA ALTA GLB 1.00 1.00 78,994.88 78,994.88 93,213.96 78,994.88

FLETE TERRESTRE DESDE HUANCAYO A ANTA BAJA GLB 1.00 1.00 27,443.53 27,443.53 32,383.37 27,443.53

FLETE TERRESTRE DESDE HUANCAYO A PICHUS GLB 1.00 1.00 83,407.84 83,407.84 98,421.25 83,407.84

FLETE RURAL ALMACEN - PIE DE OBRA (ANTA ALTA) GLB 1.00 1.00 16,037.03 16,037.03 18,923.70 16,037.03

FLETE RURAL ALMACEN - PIE DE OBRA (ANTA BAJA) GLB 1.00 1.00 5,488.97 5,488.97 6,476.98 5,488.97

FLETE RURAL ALMACEN - PIE DE OBRA (PICHUS) GLB 1.00 1.00 14,744.32 14,744.32 17,398.30 14,744.32

TALLER DE CAPACITACION EN RIEGO POR ASPERSIÓN TALLER 1.00 2.00 800.00 1,600.00 1,888.00 1,600.00

TALLER DE CAPACITACION EN CONSERVACIÓN DE SUELO TALLER 1.00 1.00 800.00 800.00 944.00 800.00
TALLER DE CAPACITACION EN OPERACION Y MANEJO DEL
TALLER 1.00 2.00 800.00 1,600.00 1,888.00 1,600.00
SISTEMA DE RIEGO
TALLER DE CAPACITACION EN USO Y MANEJO DE
TALLER 1.00 1.00 800.00 800.00 944.00 800.00
FERTILIZANTES
TALLER DE CAPACITACION PARA LA CONFORMACION DE
TALLER 1.00 1.00 800.00 800.00 944.00 800.00
CADENAS PRODUCTIVAS
TALLER DE CAPACITACION EN TEMAS DE ARTICULACION
TALLER 1.00 1.00 800.00 800.00 944.00 800.00
AL MERCADO
CONFORMACION DE ASOCIACON DE PRODUCTORES
GLB 1.00 1.00 500.00 500.00 590.00 500.00
AGROPECUARIOS
PASANTIA AL EX PROYECTO CACHI- AYACUCHO (20
VJE 1.00 1.00 7,500.00 7,500.00 8,850.00 7,500.00
PASANTES)
PASANTIA AL VALLE DE URUBAMBA-CUSCO (20 PASANTES) VJE 1.00 1.00 10,500.00 10,500.00 12,390.00 10,500.00

HERRAMIENTAS MANUALES %MO 1.00 1.00 249,095.61 249,095.61 293,932.82 249,095.61

VOLQUETE DE 10 M3 hm 1.00 40.82 101.69 4,150.65 4,897.77 4,150.65

MOTOSOLDADORA DE 250 AMPERIOS hm 1.00 746.30 33.90 25,299.70 29,853.65 25,299.70

BALDE DE PRUEBA (TUBERIA) hm 1.00 1,119.85 12.71 14,233.34 16,795.34 14,233.34

MEZCLADORA DE CONCRETO DE 9-11P3 hm 1.00 1,143.06 8.47 9,681.68 11,424.38 9,681.68

VIBRADOR DE CONCRETO 4 HP 1.50" hm 1.00 1,235.93 8.47 10,468.36 12,352.66 10,468.36


PRESUPUESTO ANALITICO GENERAL VR2
PROY. : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA) DEL
CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
COMPONENTE META : MEJORAMIENTO, AMPLIACION Y CREACION DEL SISTEMA DE RIEGO PARTE ALTA (MAYOARMA-PALLCCAPUQUIO-ASNACE), PARTE BAJA (PUNRUPUQUIO-PIÑAPUQUIO-MARCO ERA)
DEL CP. DE ANTA Y CHINCHIPAMPA-CHICURO DEL CP. PICHOS
MODALIDAD : DE EJECUCIÓN POR ADMINISTRACIÓN DIRECTA

UBICACIÓN : PACCARECTAMBO - PARURO - CUSCO Fecha : Feb-18

PRESUPUESTO APROBADO
COSTO
ESPECIF. PARCIAL SIN PARCIAL CON
DESCRIPCION UNIDAD COEFI. CANTIDAD UNITARIO SIN
GASTO IGV IGV COSTO GASTOS GASTOS DE
IGV TOTAL
DIRECTO GENERALES SUPERVISION

TECLE DE 4 TON. hm 1.00 9.07 12.71 115.25 136.00 115.25

COMPACTADOR VIBR. TIPO PLANCHA 7 HP hm 1.00 864.53 8.47 7,322.54 8,640.60 7,322.54

VIBROPISON 4.1 HP hm 1.00 15,575.08 10.17 158,398.56 186,910.30 158,398.56

CARGADOR RETROEXCAVADOR 62 HP 1 YD3 hm 1.00 1,005.32 135.59 136,311.62 160,847.71 136,311.62

TRACTOR DE ORUGAS DE 270-295 HP hm 1.00 1.68 271.19 454.30 536.07 454.30

MOVILIZACION EQUIPO PESADO und 1.00 3.00 1,677.97 5,033.91 5,940.01 5,033.91

PIONJER hm 1.00 19,548.52 25.42 496,923.43 586,369.65 496,923.43

ZARANDA MECANICA hm 1.00 1,376.39 2.24 3,083.12 3,638.08 3,083.12

TOTAL S/. 0.00 11,657,255.18 #NAME? 57,112.08 #NAME?


PRESUPUESTO ANALITICO DE GASTOS GENERALES
PRESUPUESTO APROBADO
ESPECIF. TIEMPO COSTO
DESCRIPCION UNIDAD CANTIDAD COSTO
GASTO (mes) UNITARIO PARCIAL TOTAL
DIRECTO

2.6.2.3.4.4 COSTO DE CONSTRUCCION POR CONTRATA - BIENES 0.00 30,959.62


COMBUSTIBLES Y LUBRICANTES 6,250.00
PETROLEO GAL 500 12.50 6,250.00
VESTUARIO PERSONAL TECNICO 5,376.00
ZAPATOS DE SEGURIDAD CON PUNTA DE ACERO PAR 7 460.00 3,220.00
CASCOS DE SEGURIDAD BLANCO UND 7 50.00 350.00
POLOS CON LOGOTIPO UND 7 40.00 280.00
PONCHOS IMPERMEABLES UND 7 38.00 266.00
CASACAS IMPERMEABLES ACOLCHADAS UND 7 120.00 840.00
CHALECOS CON LOGO DE LA ENTIDAD UND 7 60.00 420.00
VESTUARIO PERSONAL OBRERO 11,960.00
PONCHOS Y/O CAPOTINES IMPERMEABLES UND 40 38.00 1,520.00
CHALECOS CON LOGO UND 40 60.00 2,400.00
MAMELUCOS CON LOGO UND 40 50.00 2,000.00
POLOS DE TRABAJO CON LOGO UND 40 20.00 800.00
CASCOS PARA PERSONAL OBRERO UND 40 20.00 800.00
GUANTES DE CUERO PAR 80 20.00 1,600.00
BOTAS DE JEBE PAR 40 30.00 1,200.00
GUANTES DE JEBE PAR 80 18.00 1,440.00
LENTES DE SEGURIDAD UND 40 5.00 200.00
MEDICAMENTOS 4,032.09
MEDICAMENTOS VARIOS GLB 1 9 448.01 4,032.09
MATERIALES DE ESCRITORIO 3,341.53
CUADERNO DE OBRAS 100 FOLIOS AUTOCOPIABLES UND 6 45.00 270.00
LAPICEROS PILOT CAJA 5 36.00 180.00
PAPEL BOND A-4 DE 80 GR, INCLUYE LIQUIDACION MILLAR 15 25.00 375.00
PAPEL BOND F- A1 80 GR PARA PLANOS MILLAR 1 60.03 60.03
CUADERNOS CUADRICULADO A4 UND 18 5.50 99.00
FOLDER MANILA CIENTO 3 25.00 75.00
ARCHIVADORES UND 15 7.00 105.00
LIBRETAS DE TOPOGRAFIA UND 15 5.00 75.00
PERFORADOR UND 3 30.00 90.00
ENGRAPADOR UND 3 45.00 135.00
PARTES DIARIOS DE MAQUINARIA (BLOCK DE 50 AUTOCOPIABLE CON 3COPIABLOCK 40 35.00 1,400.00
GRAPAS CAJA 3 10.00 30.00
CD UND 30 1.00 30.00
LAPIZ PORTAMINA UND 10 5.00 50.00
STUCHE DE LAPIZ UND 5 1.50 7.50
USB DE 32GB UND 6 60.00 360.00
2.6.2.3.4.5 COSTO DE CONSTRUCCION POR CONTRATA - SERVICIOS 0.00 170,990.00
LOCACION DE SERVICIOS 122,300.00
RESIDENTE DE OBRA MES 1 4 6,000.00 24,000.00
PAGO ASISTENTE TECNICO MES 1 4 3,000.00 12,000.00
PAGO ASISTENTE ADMINISTRATIVO MES 1 4 2,500.00 10,000.00
PAGO MAESTRO DE OBRA MES 1 4 3,000.00 12,000.00
GUARDIAN DE OBRA MES 1 4 2,000.00 8,000.00
ALMACENERO MES 1 4 2,000.00 8,000.00
SERVICIOS DE NOTARIO GLB 1 1 1,500.00 1,500.00
SECRETARIA MES 1 4 2,200.00 8,800.00
CHOFER MES 1 4 2,000.00 8,000.00
INGENIERO DE SEGURIDAD MES 1 4 3,500.00 14,000.00
TOPOGRAFO MES 1 4 3,000.00 12,000.00
ARQUEOLOGO PARA MONITOREO ARQUELOGICO MES 1 4 1,000.00 4,000.00
VIATICOS Y ASIGNACIONES 4,000.00
PERSONAL PROFESIONAL/TECNICO Mes 1 4 1,000.00 4,000.00
OTROS SERVICIOS DE TERCEROS 44,690.00
DISEÑO DE MEZCLA Y ROTURA DE PROBETAS UND 1 2,500.00 2,500.00
ROTURA DE TESTIGOS DE CONCRETO UND 1 4 35.00 140.00
ESTUDIO DE MECANICA DE SUELOS UND 1 3,000.00 3,000.00
ESTUDIO DE MECANICA DE ROCAS UND 1 3,000.00 3,000.00
SERVICIO DE VERIFICACION DE DENSIDAD DE COMPACTACION UND 1 4 85.00 340.00
ALQUILER DE CAMIONETA 4X4 DOBLE CABINA Y DOBLE TRACCION MES 1 1 7,500.00 7,500.00
LEGALIZACION DE CUADERNO DE OBRA UND 1 50.00 50.00
ALQUILER DE LOCAL PARA OFICINA Y ALMACEN MES 1 4 540.00 2,160.00
SERVICIO DE ALIMENTACION DE PERSONAL TECNICO MES 1 4 4,500.00 18,000.00

SERVICIO DE ENSAYOS DE PRUEBA HIDRAULICA GLOB 1 8,000.00 8,000.00

TOTAL S/. 201,949.62


PRESUPUESTO ANALITICO DE GASTOS DE SUPERVISIÓN

PRESUPUESTO APROBADO
ESPECIF. COSTO
DESCRIPCION UNIDAD COEFIC. CANTIDAD COSTO
GASTO UNITARIO PARCIAL TOTAL
DIRECTO

2.6.2.3.4.4 COSTO DE CONSTRUCCION POR CONTRATA - BIENES 0.00 6,716.00 6,716.00


COMBUSTIBLES Y LUBRICANTES 3,750.00
PETROLEO DIESEL GLN 1 300.00 12.50 3,750.00
VESTUARIO PERSONAL TECNICO 2,094.00
ZAPATOS DE SEGURIDAD CON PUNTA DE ACERO PAR 1 3 430.00 1,290.00
CASCOS DE SEGURIDAD UND 1 3 40.00 120.00
POLOS CON LOGOTIPO UND 1 3 40.00 120.00
PONCHOS IMPERMEABLES UND 1 3 38.00 114.00
CASACAS IMPERMEABLES ACOLCHADAS UND 1 3 120.00 360.00
CHALECOS UND 1 3 30.00 90.00
MATERIALES DE ESCRITORIO 872.00
LAPICEROS PILOT CAJA 1 3 36.00 108.00
PAPEL BOND A-4 DE 80 GR ATLAS MILLAR 1 10 25.00 250.00
CUARDENOS CUADRICULADO A4 UND 1 2 5.50 11.00
FOLDER MANILA CIENTO 1 2 25.00 50.00
ARCHIVADORES UND 1 10 7.00 70.00
LIBRETAS DE TOPOGRAFIA UND 1 10 5.00 50.00
PERFORADOR UND 1 1 30.00 30.00
ENGRAPADOR UND 1 1 45.00 45.00
GRAPAS CAJA 1 1 10.00 10.00
CD UND 1 50 1.00 50.00
LAPIZ PORTAMINA UND 1 3 5.00 15.00
STUCHE DE LAPIZ UND 1 2 1.50 3.00
USB DE 32GB UND 1 3 60.00 180.00

2.6.2.3.4.5 COSTO DE CONSTRUCCION POR CONTRATA - SERVICIOS 0.00 103,581.61 103,581.61


LOCACION DE SERVICIOS 70,000.00
PAGO SUPERVISOR EXTERNO MES 1 4 6,500.00 26,000.00
PAGO ASISTENTE DE SUPERVISION MES 1 4 3,000.00 12,000.00
ESPECIALISTA EN MECANICA DE SUELOS MES 1 4 3,000.00 12,000.00
CADISTA MES 1 4 3,000.00 12,000.00
CHOFER MES 1 4 2,000.00 8,000.00
33,581.61
OTROS SERVICIOS DE TERCEROS
ESTUDIO DE MECANICA DE SUELOS y ROCAS UND 1 1 1,500.00 1,500.00
SERVICIO DE VERIFICACION DE DENSIDAD DE COMPACTACION UND 1 4 86.00 344.00
SERVICIO DE ALQUILER DE CAMIONETA PARA SUPERVISION MES 1 4 6,000.00 24,000.00
SERVICIO DE ALIMENTACION DE PERSONAL TECNICO MES 1 4 1,934.40 7,737.61
COSTO DE SUPERVISION #REF! #REF! #REF!
PRESUPUESTO ANALITICO DE GASTOS GESTIÓN DEL PROYECTO
PRESUPUESTO APROBADO
ESPECIF. TIEMPO COSTO
DESCRIPCION UNIDAD CANTIDAD COSTO
GASTO (mes) UNITARIO PARCIAL TOTAL
DIRECTO

2.6.2.3.4.5 COSTO DE CONSTRUCCION POR CONTRATA - SERVICIOS 19,000.00


Administrador del Proyecto PAR 1 4 8,000.00 8,000.00
Servicio para trámite de licencias y permisos UND 1 4 6,000.00 6,000.00
Otros servicios y trámites UND 1 4 5,000.00 5,000.00

TOTAL S/. 19,000.00


DESAGREGADO DE GASTOS DE LIQUIDACIÓN

Tiempo total
Supervisión Liquidación
Item Descripción Und. Cant. de P. U. (S/.) Parcial (S/.) Total (S/.)
de obra de obra
participación

2.6.2.3.4.5 COSTO DE CONSTRUCCION POR CONTRATA - SERVICIOS 15550


A. Honorarios, sueldos y salarios
Personal profesional 6,000.00
Ing. Civil,Agricola,Agronomo - Liquid Mes 1.0 1.0 1.0 6,000.00 6,000.00
Personal técnico 6,500.00
Auxiliar técnico Mes 1.0 1.0 1.0 3,500.00 3,500.00
Auxiliar administrativo Mes 1.0 1.0 1.0 3,000.00 3,000.00
Personal auxiliar 1,800.00
Secretaria Mes 1.0 1.0 1.0 1,800.00 1,800.00
B. Alquileres y servicios 1,250.00
Alquiler de equipo de computo Mes 1.0 1.0 1.0 1,250.00 1,250.00
2.6.2.3.4.4 COSTO DE CONSTRUCCION POR CONTRATA - BIENES 1,900.00
C. Materiales y útiles de oficina 1,900.00
Utiles de oficina y dibujo Glb 1.0 1.0 1.0 1,200.00 1,200.00
Materiales fotográficos y filmicos Glb 1.0 1.0 1.0 700.00 700.00
Total 17,450.00
RESUMEN ANALITICO DE GASTOS GENERALES
PROY. : #NAME?

MODALIDAD : #NAME?
UBICACIÓN: : #NAME? Año Fiscal : #NAME?

PRESUPUESTO APROBADO

ESPECIF.
DESCRIPCION UNIDAD COSTO INDIRECTO
GASTO COSTO
DIRECTO GASTOS GASTO GESTION DE LIQUIDACION DE
TOTAL
GENERALES SUPERVISION PROYECTO OBRA

2.6.2.3.4.3 COSTO DE CONSTRUCCION POR CONTRATA - PERSONAL 422,200.67 0.00 422,200.67

LB 422,200.67 0.00

2.6.2.3.4.4 COSTO DE CONSTRUCCION POR CONTRATA - BIENES 1,727,434.34 30,959.62 6,716.00 1,900.00 1,767,009.96

GLB 1,727,434.34 30,959.62 6,716.00 1,900.00


0.00

2.6.2.3.4.5 COSTO DE CONSTRUCCION POR CONTRATA - SERVICIOS 271,143.41 170,990.00 103,581.61 19,000.00 15,550.00 580,265.02

GLB 271,143.41 170,990.00 103,581.61 19,000.00 15,550.00

TOTAL S/. 2,420,778.42 201,949.62 110,297.61 19,000.00 17,450.00 2,769,475.65