OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008
LONG. MEDIDAS
Item DESCRIPCION Und Sub Total Total
Nro Veces Largo Alto Ancho Parcial
LONG. MEDIDAS
Item DESCRIPCION Und Sub Total Total
Nro Veces Largo Alto Ancho Parcial
LONG. MEDIDAS
Item DESCRIPCION Und Sub Total Total
Nro Veces Largo Alto Ancho Parcial
LONG. MEDIDAS
Item DESCRIPCION Und Sub Total Total
Nro Veces Largo Alto Ancho Parcial
LONG. MEDIDAS
Item DESCRIPCION Und Sub Total Total
Nro Veces Largo Alto Ancho Parcial
03.06.01 TAPA DE INSPECCION DE 0,60X0,60 INC. BISAGRA Y CANDADO UND 2 2.00 2.00
METRADO DE ACERO
Ø -------> 1/4 '' 3/8 '' 1/2 '' 5/8 '' 3/4 '' 1 '' Sub
PARTIDA DESCRIPCION Und Total
kg/m -------> 0.25 0.58 1.02 1.60 2.26 4.04 Total
Corte de acero Nro. ElemNro. Veces Ø Longitug kg/m Parcial
CAMARA DE REUNION
03.04.03 ACERO CORTADO Y TRABAJADO Fy=4200 kg/cm2
A CAMARA DE INSPECCION
ACERO EN MURO KG
DIRECCION X-X 2.75 1.00 19.00 3/8 '' 2.75 0.58 30.31
DIRECCION Y-Y 2.75 1.00 19.00 3/8 '' 2.75 0.58 30.31
DIRECCION X-X 2.75 1.00 19.00 3/8 '' 2.75 0.58 30.31
DIRECCION Y-Y 2.75 1.00 19.00 3/8 '' 2.75 0.58 30.31
B CAMARA DE VALVULAS
ACERO EN MURO KG
DIRECCION X-X 0.95 1.00 7.00 3/8 '' 0.95 0.58 3.86
DIRECCION Y-Y 0.95 1.00 7.00 3/8 '' 0.95 0.58 3.86
DIRECCION X-X 0.95 1.00 7.00 3/8 '' 0.95 0.58 3.86
DIRECCION Y-Y 0.95 1.00 7.00 3/8 '' 0.95 0.58 3.86
LONG. MEDIDAS
Item DESCRIPCION Und Sub Total Total
Nro Veces Largo Alto Ancho Parcial
LONG. MEDIDAS
Item DESCRIPCION Und Sub Total Total
Nro Veces Largo Alto Ancho Parcial
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10
2+350 10.00 3649.950 3649.246 0.70 50% 50% 4.74 1.5 C-7.5 0 0 10 0
2+360 10.00 3649.534 3648.704 0.83 50% 50% 5.32 1.5 C-7.5 0 0 10 0
2+370 10.00 3649.711 3648.970 0.74 50% 50% 5.79 1.5 C-7.5 0 0 10 0
2+380 10.00 3649.697 3648.962 0.74 50% 50% 5.37 1.5 C-7.5 0 0 10 0
2+390 10.00 3649.678 3648.813 0.86 50% 50% 5.95 1.5 C-7.5 0 0 10 0
2+400 10.00 3649.404 3648.896 0.51 50% 50% 4.84 1.5 C-7.5 0 0 10 0
2+410 10.00 3649.436 3648.725 0.71 50% 50% 3.84 1.5 C-7.5 0 0 10 0
2+420 10.00 3647.772 3647.023 0.75 50% 50% 4.68 1.5 C-7.5 0 0 10 0
2+430 10.00 3646.060 3645.321 0.74 50% 50% 4.84 1.5 C-7.5 0 0 10 0
2+440 10.00 3644.553 3643.847 0.71 50% 50% 4.68 1.5 C-7.5 0 0 10 0
2+450 10.00 3643.379 3642.679 0.70 50% 50% 4.63 1.5 C-7.5 0 0 10 0
2+460 10.00 3642.431 3641.731 0.70 50% 50% 4.63 1.5 C-7.5 0 0 10 0
2+470 10.00 3642.610 3641.910 0.70 50% 50% 4.53 1.5 C-7.5 0 0 10 0
2+480 10.00 3642.771 3642.013 0.76 50% 50% 4.68 1.5 C-7.5 0 0 10 0
2+490 10.00 3642.217 3641.517 0.70 50% 50% 5.16 1.5 C-7.5 0 0 10 0
2+500 10.00 3642.167 3641.467 0.70 50% 50% 5.47 1.5 C-7.5 0 0 10 0
2+510 10.00 3642.666 3641.964 0.70 50% 50% 5.47 1.5 C-7.5 0 0 10 0
2+520 10.00 3642.105 3641.370 0.74 50% 50% 5.32 1.5 C-7.5 0 0 10 0
2+530 10.00 3638.902 3638.167 0.74 50% 50% 5.16 1.5 C-7.5 0 0 10 0
2+540 10.00 3636.741 3636.026 0.72 50% 50% 5.00 1.5 C-7.5 0 0 10 0
2+550 10.00 3634.612 3633.896 0.72 50% 50% 4.84 1.5 C-7.5 0 0 10 0
2+560 10.00 3634.646 3633.958 0.69 50% 50% 4.63 1.5 C-7.5 0 0 10 0
2+570 10.00 3634.547 3633.905 0.64 50% 50% 4.26 1.5 C-7.5 0 0 10 0
2+580 10.00 3634.447 3633.852 0.60 50% 50% 3.95 1.5 C-7.5 0 0 10 0
2+590 10.00 3634.463 3633.799 0.66 50% 50% 4.00 1.5 C-7.5 0 0 10 0
2+600 10.00 3634.549 3633.746 0.80 50% 50% 4.89 1.5 C-7.5 0 0 10 0
2+610 10.00 3631.280 3630.566 0.71 50% 50% 5.21 1.5 C-7.5 0 0 10 0 VAL PUR
2+620 10.00 3631.575 3630.874 0.70 50% 50% 4.79 1.5 C-7.5 0 0 10 0
2+630 10.00 3633.481 3632.630 0.85 50% 50% 5.37 1.5 C-7.5 0 0 10 0
2+640 10.00 3637.001 3636.205 0.80 50% 50% 5.74 1.5 C-7.5 0 0 10 0
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10
2+650 10.00 3640.270 3639.613 0.66 50% 50% 4.79 1.5 C-7.5 0 0 10 0 VAL AIRE
2+660 10.00 3640.323 3639.596 0.73 50% 50% 4.21 1.5 C-7.5 0 0 10 0
2+670 10.00 3640.026 3639.295 0.73 50% 50% 4.47 1.5 C-7.5 0 0 10 0
2+680 10.00 3637.125 3636.422 0.70 50% 50% 4.53 1.5 C-7.5 0 0 10 0
2+690 10.00 3633.704 3632.942 0.76 50% 50% 5.42 1.5 C-7.5 0 0 10 0
2+700 10.00 3630.385 3629.665 0.72 50% 50% 5.95 1.5 C-7.5 0 0 10 0
2+710 10.00 3629.527 3628.891 0.64 50% 50% 5.37 1.5 C-7.5 0 0 10 0
2+720 10.00 3626.405 3625.701 0.70 50% 50% 5.58 1.5 C-7.5 0 0 10 0
2+730 10.00 3625.570 3624.870 0.70 50% 50% 5.63 1.5 C-7.5 0 0 10 0
2+740 10.00 3624.717 3624.012 0.70 50% 50% 5.68 1.5 C-7.5 0 0 10 0
2+750 10.00 3622.559 3621.877 0.68 50% 50% 5.58 1.5 C-7.5 0 0 10 0
3622.559 3621.877 0.68 CR-2
2+760 10.00 3621.523 3620.805 0.72 50% 50% 5.00 1.5 C-7.5 0 0 10 0
2+770 10.00 3618.115 3617.500 0.61 50% 50% 4.37 1.5 C-7.5 0 0 10 0
2+780 10.00 3616.607 3615.900 0.71 50% 50% 4.32 1.5 C-7.5 0 0 10 0
2+790 10.00 3614.050 3613.393 0.66 50% 50% 4.47 1.5 C-7.5 0 0 10 0
2+800 10.00 3612.981 3612.275 0.71 50% 50% 4.74 1.5 C-7.5 0 0 10 0
2+810 10.00 3610.186 3609.488 0.70 50% 50% 5.21 1.5 C-7.5 0 0 10 0
2+820 10.00 3609.395 3608.685 0.71 50% 50% 5.21 1.5 C-7.5 0 0 10 0
2+830 10.00 3606.675 3605.975 0.70 50% 50% 5.26 1.5 C-7.5 0 0 10 0
2+840 10.00 3604.218 3603.282 0.94 50% 50% 6.16 1.5 C-7.5 0 0 10 0
2+850 10.00 3602.466 3601.987 0.48 50% 50% 5.05 1.5 C-7.5 0 0 10 0
2+860 10.00 3601.739 3600.978 0.76 50% 50% 4.16 1.5 C-7.5 0 0 10 0
2+870 10.00 3600.169 3599.443 0.73 50% 50% 5.05 1.5 C-7.5 0 0 10 0
2+880 10.00 3598.434 3597.734 0.70 50% 50% 4.79 1.5 C-7.5 0 0 10 0
2+890 10.00 3597.925 3597.035 0.89 50% 50% 5.53 1.5 C-7.5 0 0 10 0
2+900 10.00 3595.120 3594.432 0.69 50% 50% 6.42 1.5 C-7.5 0 0 10 0
2+910 10.00 3593.177 3592.482 0.70 50% 50% 6.53 1.5 C-7.5 0 0 10 0
2+920 10.00 3588.494 3587.720 0.77 50% 50% 6.89 1.5 C-7.5 0 0 10 0
2+930 10.00 3583.672 3582.903 0.77 50% 50% 7.26 1.5 C-7.5 0 0 10 0
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10
2+940 10.00 3582.567 3581.912 0.66 50% 50% 6.74 1.5 C-7.5 0 0 10 0
2+950 10.00 3581.701 3580.784 0.92 50% 50% 8.47 1.5 C-7.5 0 0 10 0
2+960 10.00 3577.621 3576.692 0.93 50% 50% 8.63 1.5 C-7.5 0 0 10 0
2+970 10.00 3574.352 3573.616 0.74 50% 50% 6.42 1.5 C-7.5 0 0 10 0
3574.352 3573.616 0.74 CR-3
2+980 10.00 3570.447 3569.758 0.69 50% 50% 6.11 1.5 C-7.5 0 0 10 0
2+990 10.00 3566.475 3565.814 0.66 50% 50% 5.79 1.5 C-7.5 0 0 10 0
3+000 10.00 3564.384 3563.682 0.70 50% 50% 5.89 1.5 C-7.5 0 0 10 0
3+010 10.00 3561.184 3560.513 0.67 50% 50% 5.84 1.5 C-7.5 0 0 10 0
3+020 10.00 3558.845 3558.109 0.74 50% 50% 5.95 1.5 C-7.5 0 0 10 0
3+030 10.00 3555.742 3555.025 0.72 50% 50% 6.26 1.5 C-7.5 0 0 10 0
3+040 10.00 3555.281 3554.505 0.78 50% 50% 6.47 1.5 C-7.5 0 0 10 0
3+050 10.00 3552.329 3551.656 0.67 50% 50% 6.26 1.5 C-7.5 0 0 10 0
3+060 10.00 3549.653 3548.931 0.72 50% 50% 6.00 1.5 C-7.5 0 0 10 0
3+070 10.00 3547.382 3546.376 1.01 50% 50% 6.84 1.5 C-7.5 0 0 10 0
3+080 10.00 3545.319 3544.630 0.69 50% 50% 6.68 1.5 C-7.5 0 0 10 0
3+090 10.00 3537.874 3537.173 0.70 50% 50% 5.16 1.5 C-7.5 0 0 10 0
3+100 10.00 3535.490 3534.814 0.68 50% 50% 4.58 1.5 C-7.5 0 0 10 0
3+110 10.00 3534.307 3533.536 0.77 50% 50% 4.84 1.5 C-7.5 0 0 10 0
3+120 10.00 3531.067 3530.292 0.78 50% 50% 5.00 1.5 C-7.5 0 0 10 0
3+130 10.00 3526.965 3526.358 0.61 50% 50% 4.68 1.5 C-7.5 0 0 10 0
3+140 10.00 3524.732 3524.028 0.70 50% 50% 4.79 1.5 C-7.5 0 0 10 0
3524.732 3524.028 0.70 CR-4
3+150 10.00 3522.818 3521.884 0.93 50% 50% 5.95 1.5 C-7.5 0 0 10 0
3+160 10.00 3520.431 3519.683 0.75 50% 50% 6.16 1.5 C-7.5 0 0 10 0
3+170 10.00 3519.081 3518.139 0.94 50% 50% 6.42 1.5 C-7.5 0 0 10 0
3+180 10.00 3516.511 3515.807 0.70 50% 50% 6.26 1.5 C-7.5 0 0 10 0
3+190 10.00 3513.183 3512.469 0.71 50% 50% 5.37 1.5 C-7.5 0 0 10 0
3+200 10.00 3509.186 3508.411 0.78 50% 50% 5.53 1.5 C-7.5 0 0 10 0
3+210 10.00 3506.354 3505.633 0.72 50% 50% 5.53 1.5 C-7.5 0 0 10 0
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10
3+220 10.00 3501.037 3500.271 0.77 50% 50% 5.26 1.5 C-7.5 0 0 10 0
3+230 10.00 3496.666 3495.965 0.70 50% 50% 5.11 1.5 C-7.5 0 0 10 0
3+240 10.00 3494.616 3493.913 0.70 50% 50% 5.05 1.5 C-7.5 0 0 10 0
3+250 10.00 3490.801 3490.035 0.77 50% 50% 5.21 1.5 C-7.5 0 0 10 0
3+260 10.00 3488.214 3487.509 0.70 50% 50% 5.32 1.5 C-7.5 0 0 10 0
3+270 10.00 3485.420 3484.681 0.74 50% 50% 5.42 1.5 C-7.5 0 0 10 0
3+280 10.00 3482.346 3481.554 0.79 50% 50% 5.79 1.5 C-7.5 0 0 10 0
3+290 10.00 3480.330 3479.579 0.75 50% 50% 6.79 1.5 C-7.5 0 0 10 0
3+300 10.00 3480.037 3479.353 0.68 50% 50% 7.53 1.5 C-7.5 0 0 10 0
3+310 10.00 3479.795 3479.139 0.66 50% 50% 7.37 1.5 C-7.5 0 0 10 0
3+320 10.00 3476.969 3476.181 0.79 50% 50% 7.84 1.5 C-7.5 0 0 10 0
3476.969 3476.181 0.79 CR-5
3+330 10.00 3472.430 3471.765 0.66 50% 50% 7.21 1.5 C-7.5 0 0 10 0
3+340 10.00 3470.357 3470.101 0.26 50% 50% 4.26 1.5 C-7.5 0 0 10 0
3+350 10.00 3468.744 3468.437 0.31 50% 50% 2.26 1.5 C-7.5 0 0 10 0
3+360 10.00 3467.201 3466.774 0.43 50% 50% 2.37 1.5 C-7.5 0 0 10 0
3+370 10.00 3465.657 3465.110 0.55 50% 50% 3.11 1.5 C-7.5 0 0 10 0
3+380 10.00 3464.114 3463.446 0.67 50% 50% 3.84 1.5 C-7.5 0 0 10 0
3+390 10.00 3462.623 3461.782 0.84 50% 50% 5.21 1.5 C-7.5 0 0 10 0
3+400 10.00 3456.882 3456.090 0.79 50% 50% 5.79 1.5 C-7.5 0 0 10 0
3+410 10.00 3450.629 3449.874 0.76 50% 50% 5.58 1.5 C-7.5 0 0 10 0
3+420 10.00 3444.434 3443.658 0.78 50% 50% 6.37 1.5 C-7.5 0 0 10 0
3+430 10.00 3443.875 3443.146 0.73 50% 50% 6.16 1.5 C-7.5 0 0 10 0
3+440 10.00 3443.534 3442.705 0.83 50% 50% 5.53 1.5 C-7.5 0 0 10 0 VAL AIRE
3+450 10.00 3436.532 3435.621 0.91 50% 50% 6.05 1.5 C-7.5 0 0 10 0
3+460 10.00 3431.289 3430.573 0.72 50% 50% 5.84 1.5 C-7.5 0 0 10 0 VAL PUR
3+470 10.00 3433.566 3432.641 0.92 50% 50% 7.05 1.5 C-7.5 0 0 10 0
3+480 10.00 3427.442 3426.482 0.96 50% 50% 9.11 1.5 C-7.5 0 0 10 0
3427.442 3426.482 0.96 CR-6
3+490 10.00 3419.310 3418.522 0.79 50% 50% 7.16 1.5 C-7.5 0 0 10 0
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10
3+500 10.00 3413.284 3412.495 0.79 50% 50% 5.00 1.5 C-7.5 0 0 10 0
3+510 10.00 3407.701 3406.977 0.72 50% 50% 5.32 1.5 C-7.5 0 0 10 0
3+520 10.00 3404.949 3404.236 0.71 50% 50% 5.53 1.5 C-7.5 0 0 10 0
3+530 10.00 3402.112 3401.360 0.75 50% 50% 5.63 1.5 C-7.5 0 0 10 0
3+540 10.00 3398.211 3397.459 0.75 50% 50% 5.89 1.5 C-7.5 0 0 10 0
3+550 10.00 3395.338 3394.633 0.71 50% 50% 5.37 1.5 C-7.5 0 0 10 0
3+560 10.00 3395.335 3394.695 0.64 50% 50% 4.47 1.5 C-7.5 0 0 10 0
3+570 10.00 3395.331 3394.756 0.58 50% 50% 3.95 1.5 C-7.5 0 0 10 0
3+580 10.00 3395.368 3394.818 0.55 50% 50% 3.58 1.5 C-7.5 0 0 10 0
3+590 10.00 3395.006 3394.215 0.79 50% 50% 4.63 1.5 C-7.5 0 0 10 0
3+600 10.00 3393.165 3392.404 0.76 50% 50% 5.63 1.5 C-7.5 0 0 10 0
3+610 10.00 3391.323 3390.594 0.73 35% 65% 5.32 1.5 C-7.5 0 0 10 0
3+620 10.00 3390.273 3389.581 0.69 35% 65% 5.00 1.5 C-7.5 0 0 10 0
3+630 10.00 3393.800 3393.081 0.72 35% 65% 4.74 1.5 C-7.5 0 0 10 0
3+640 10.00 3397.339 3396.622 0.72 35% 65% 4.74 1.5 C-7.5 0 0 10 0
3+650 10.00 3397.530 3396.745 0.79 35% 65% 5.21 1.5 C-7.5 0 0 10 0
3+660 10.00 3397.608 3396.869 0.74 35% 65% 5.32 1.5 C-7.5 0 0 10 0
3+670 10.00 3397.638 3396.992 0.65 35% 65% 4.58 1.5 C-7.5 0 0 10 0
3+680 10.00 3397.600 3396.911 0.69 35% 65% 4.42 1.5 C-7.5 0 0 10 0
3+690 10.00 3397.459 3396.781 0.68 35% 65% 4.68 1.5 C-7.5 0 0 10 0
3+700 10.00 3399.743 3399.030 0.71 35% 65% 4.84 1.5 C-7.5 0 0 10 0
3+710 10.00 3403.111 3402.401 0.71 20% 80% 5.11 1.5 C-7.5 0 0 10 0
3+720 10.00 3404.817 3404.107 0.71 20% 80% 5.16 1.5 C-7.5 0 0 10 0
3+730 10.00 3406.522 3405.812 0.71 20% 80% 5.16 1.5 C-7.5 0 0 10 0
3+740 10.00 3409.003 3408.281 0.72 20% 80% 5.21 1.5 C-7.5 0 0 10 0
3+750 10.00 3409.309 3408.612 0.70 20% 80% 5.89 1.5 C-7.5 0 0 10 0
3+760 10.00 3409.639 3408.940 0.70 20% 80% 6.58 1.5 C-7.5 0 0 10 0
3+770 10.00 3410.540 3409.815 0.72 20% 80% 6.47 1.5 C-7.5 0 0 10 0
3+780 10.00 3412.394 3411.671 0.72 20% 80% 6.00 1.5 C-7.5 0 0 10 0
3+790 10.00 3412.649 3411.925 0.72 20% 80% 5.47 1.5 C-7.5 0 0 10 0
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10
3+800 10.00 3412.566 3411.861 0.70 20% 80% 5.21 1.5 C-7.5 0 0 10 0
3+810 10.00 3411.615 3410.900 0.71 20% 80% 5.21 1.5 C-7.5 0 0 10 0
3+820 10.00 3409.811 3409.082 0.73 20% 80% 5.26 1.5 C-7.5 0 0 10 0
3+830 10.00 3407.749 3407.036 0.71 20% 80% 5.26 1.5 C-7.5 0 0 10 0
3+840 10.00 3407.737 3406.986 0.75 20% 80% 5.47 1.5 C-7.5 0 0 10 0
3+850 10.00 3407.610 3406.901 0.71 20% 80% 5.84 1.5 C-7.5 0 0 10 0
3+860 10.00 3406.828 3406.149 0.68 20% 80% 5.21 1.5 C-7.5 0 0 10 0
3+870 10.00 3406.588 3405.887 0.70 20% 80% 4.79 1.5 C-7.5 0 0 10 0
3+880 10.00 3406.266 3405.562 0.70 20% 80% 5.16 1.5 C-7.5 0 0 10 0
3+890 10.00 3405.566 3404.890 0.68 20% 80% 5.00 1.5 C-7.5 0 0 10 0
3+900 10.00 3405.560 3404.857 0.70 20% 80% 5.05 1.5 C-7.5 0 0 10 0
3+910 10.00 3404.278 3403.559 0.72 20% 80% 5.79 1.5 C-7.5 0 0 10 0
3+920 10.00 3402.459 3401.756 0.70 20% 80% 5.58 1.5 C-7.5 0 0 10 0
3+930 10.00 3401.577 3400.874 0.70 20% 80% 4.84 1.5 C-7.5 0 0 10 0
3+940 10.00 3400.695 3399.992 0.70 20% 80% 4.84 1.5 C-7.5 0 0 10 0
3+950 10.00 3399.762 3399.041 0.72 20% 80% 4.89 1.5 C-7.5 0 0 10 0
3+960 10.00 3399.419 3398.705 0.71 20% 80% 4.68 1.5 C-7.5 0 0 10 0
3+970 10.00 3397.409 3396.783 0.63 20% 80% 4.21 1.5 C-7.5 0 0 10 0
3+980 10.00 3395.500 3394.861 0.64 20% 80% 4.00 1.5 C-7.5 0 0 10 0
3+990 10.00 3393.592 3392.939 0.65 20% 80% 4.05 1.5 C-7.5 0 0 10 0
4+000 10.00 3391.572 3390.869 0.70 20% 80% 4.47 1.5 C-7.5 0 0 10 0
4+010 10.00 3389.060 3388.361 0.70 20% 80% 4.79 1.5 C-7.5 0 0 10 0
4+020 10.00 3386.779 3386.072 0.71 20% 80% 4.79 1.5 C-7.5 0 0 10 0
4+030 10.00 3385.131 3384.363 0.77 20% 80% 5.00 1.5 C-7.5 0 0 10 0
4+040 10.00 3380.795 3379.900 0.89 20% 80% 5.74 1.5 C-7.5 0 0 10 0
4+050 10.00 3376.407 3375.664 0.74 20% 80% 5.63 1.5 C-7.5 0 0 10 0
4+060 10.00 3372.844 3372.100 0.74 20% 80% 4.95 1.5 C-10 0 0 0 10
4+070 10.00 3372.733 3372.038 0.70 20% 80% 4.68 1.5 C-10 0 0 0 10 VAL PUR
4+080 10.00 3373.524 3372.823 0.70 20% 80% 4.42 1.5 C-10 0 0 0 10
4+086 6.29 3373.509 3372.817 0.69 20% 80% 4.42 1.5 C-10 0 0 0 6.291
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10
LONG. MEDIDAS
Item DESCRIPCION Und Sub Total Total
Nro Veces Largo Alto Ancho Parcial
05.03.03 CAMA DE ARENA MANUAL E=0.10 M ZANJA P/TUB HASTA 50MM ML 96.00
C.ROMPEPRESION 6 6.00 36.00
RESERVORIO 1 50.00 50.00
C.DE REUNION 1 10.00 10.00
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008
msnm msnm m % % Pulg TUBERIA Largo (m) Ancho (m) Altura (m) Espesor (m)
CAMARAS ROMPEPRESION
CR-01 2+250 3672.98 3671.93 1.05 50% 50% 2 C-7.5 1.10 1.10 1.20 0.15
CR-02 2+750 3622.56 3621.88 0.68 50% 50% 1.5 C-7.5 1.10 1.10 1.20 0.15
CR-03 2+970 3574.35 3573.62 0.74 50% 50% 1.5 C-7.5 1.10 1.10 1.20 0.15
CR-04 3+140 3524.73 3524.03 0.70 50% 50% 1.5 C-7.5 1.10 1.10 1.20 0.15
CR-05 3+320 3476.97 3476.18 0.79 50% 50% 1.5 C-7.5 1.10 1.10 1.20 0.15
CR-06 3+480 3427.44 3426.48 0.96 50% 50% 1.5 C-7.5 1.10 1.10 1.20 0.15
CAMARAS PARA VALVULA DE AIRE
V. Aire 01 0+088 3707.80 3707.10 0.70 50% 50% 2 C-7.5 1.10 1.10 1.30 0.15
V. Aire 02 0+341 3685.35 3684.65 0.70 50% 50% 2 C-7.5 1.10 1.10 1.30 0.15
V. Aire 03 0+671 3659.54 3658.83 0.71 20% 80% 2 C-10 1.10 1.10 1.30 0.15
V. Aire 04 0+939 3677.14 3676.44 0.70 20% 80% 2 C-10 1.10 1.10 1.30 0.15
V. Aire 05 1+252 3683.72 3683.01 0.71 20% 80% 2 C-7.5 1.10 1.10 1.30 0.15
V. Aire 06 1+674 3707.65 3706.94 0.71 30% 70% 2 C-7.5 1.10 1.10 1.30 0.15
V. Aire 07 1+999 3704.92 3704.21 0.71 50% 50% 2 C-7.5 1.10 1.10 1.30 0.15
V. Aire 08 2+650 3640.33 3639.61 0.72 50% 50% 1.5 C-7.5 1.10 1.10 1.30 0.15
V. Aire 09 3+437 3445.58 3444.87 0.71 50% 50% 1.5 C-7.5 1.10 1.10 1.30 0.15
V. Aire 10 3+785 3412.66 3411.96 0.70 50% 50% 1.5 C-7.5 1.10 1.10 1.30 0.15
CAMARAS PARA VALVULA DE PURGA
V. Purga 01 0+141 3690.44 3688.76 1.68 50% 50% 2 C-7.5 1.10 1.10 1.10 0.15
V. Purga 02 0+628 3646.37 3645.16 1.21 20% 80% 2 C-10 1.10 1.10 1.10 0.15
V. Purga 03 0+772 3626.96 3623.62 3.34 20% 80% 2 C-10 1.10 1.10 1.10 0.15
V. Purga 04 1+690 3696.48 3695.64 0.84 30% 70% 2 C-7.5 1.10 1.10 1.10 0.15
V. Purga 05 1+952 3692.09 3690.25 1.84 50% 50% 2 C-7.5 1.10 1.10 1.10 0.15
V. Purga 06 2+609 3631.21 3630.39 0.82 50% 50% 1.5 C-7.5 1.10 1.10 1.10 0.15
V. Purga 07 3+459 3441.17 3440.46 0.71 50% 50% 1.5 C-7.5 1.10 1.10 1.10 0.15
V. Purga 08 4+064 3372.24 3371.54 0.70 20% 80% 1.5 C-10 1.10 1.10 1.10 0.15
CAMARAS PARA DISTRIBUCION
CD - 01 (Aducc) 0+246 3332.82 3332.12 0.70 80% 20% 1.5 C-7.5 1.10 1.10 1.10 0.15
HOJA DE METRADO DE CAMARA ROMPEPRESION, DE PURGA Y DE AIRE
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008
iii RELLENO CON MATERIAL PROPIO SELECCIONADO M3 1.10 0.80 1.10 0.97 0.97 0.97
coef esponj.
ESPARCIDO DE MAT. EXCEDENTE HASTA D. PROM.=
iv M3 1 V= 0.30 0.39 0.39
30.00 m.
b CONCRETO SIMPLE
i SOLADO Cº SIMPLE E=4" (CONCRETO 100 KG/CM2) M2 1 1.10 0.10 1.10 0.12 0.12
c CONCRETO ARMADO M3
i CONCRETO ARMADO 210 KG/CM2 0.89
PISO 1 1.10 0.15 1.10 0.18 0.89
MURO 4 1.10 0.80 0.15 0.53
LOSA 1 1.10 0.15 1.10 0.18
B CAMARA DE PURGA
a MOVIENTO DE TIERRAS
i EXCAVACION EN TERRENO NORMAL M3 1.15
CAMARA DE PURGA 1 1.10 0.95 1.10 1.15 1.15
1 0.30 0.35 0.30 0.03
1 0.60 0.15 0.60 0.05
iii RELLENO CON MATERIAL PROPIO SELECCIONADO M3 1.10 0.80 1.10 0.97 0.97 0.97
coef. Esponj.
ESPARCIDO DE MAT. EXCEDENTE HASTA D. PROM.=
iv M3 1 V= 0.18 1.30 0.23 0.23
30.00 m.
HOJA DE METRADO DE CAMARA ROMPEPRESION, DE PURGA Y DE AIRE
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008
c CONCRETO ARMADO M3
i CONCRETO ARMADO 210 KG/CM2 0.89
PISO 1 1.10 0.15 1.10 0.18 0.89
MURO 4 1.10 0.80 0.15 0.53
LOSA 1 1.10 0.15 1.10 0.18
iii RELLENO CON MATERIAL PROPIO SELECCIONADO M3 1.10 1.00 1.10 1.21 1.21 1.21
b CONCRETO SIMPLE
i SOLADO Cº SIMPLE E=4" (CONCRETO F'C=100 KG/CM2) M2 1 1.10 0.10 1.10 0.12 0.12
HOJA DE METRADO DE CAMARA ROMPEPRESION, DE PURGA Y DE AIRE
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008
METRADO DE ACERO
Ø -------> 1/4 '' 3/8 '' 1/2 '' 5/8 '' 3/4 '' 1 '' Sub
PARTIDA DESCRIPCION Und Total
kg/m -------> 0.25 0.58 1.02 1.60 2.26 4.04 Total
0.32 0.58 1.02 1.60 2.34 4.10
ACERO CORTADO Y TRABAJADO Fy=4200 kg/cm2
CAMARA ROMPEPRESION
ACERO EN MURO KG
HORIZONTAL 1.40 4.00 8.00 3/8 '' 1.40 0.58 25.98
51.96
ACERO PISO KG
DIRECCION X-X 1.00 1.00 7.00 3/8 '' 1.00 0.58 4.06
DIRECCION Y-Y 1.00 1.00 7.00 3/8 '' 1.00 0.58 4.06
8.12
ACERO EN TECHO KG
DIRECCION X-X 1.00 1.00 7.00 3/8 '' 1.00 0.58 4.06
DIRECCION Y-Y 1.00 1.00 7.00 3/8 '' 1.00 0.58 4.06
REFUERZO EN TAPAS 0.90 4.00 1.00 1/2 '' 0.90 1.02 3.67
11.79 71.87
51.39
ACERO PISO KG
DIRECCION X-X 1.10 1.00 7.00 3/8 '' 1.10 0.58 4.47
DIRECCION Y-Y 1.10 1.00 7.00 3/8 '' 1.10 0.58 4.47
8.94
ACERO EN TECHO KG
DIRECCION X-X 1.10 1.00 7.00 3/8 '' 1.10 0.58 4.47
DIRECCION Y-Y 1.10 1.00 7.00 3/8 '' 1.10 0.58 4.47
REFUERZO EN TAPAS 0.90 4.00 1.00 1/2 '' 0.90 1.02 3.67
12.61 72.94
HOJA DE METRADO DE RESERVORIO DE ALMACENAMIENTO
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008
06.04.01.3 ACERO FY=4200 KG/CM2 KG VER HOJA DE METRADOS ACERO 0.00 203.22
06.04.02 MUROS
06.04.02.1 CONCRETO ARMADO 210 KG/CM2 M3 4.51
RESERVORIO 2 4.80 1.60 0.15 2.30
RESERVORIO 2 3.00 1.60 0.15 1.44
HOJA DE METRADO DE RESERVORIO DE ALMACENAMIENTO
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008
06.04.02.3 ACERO FY=4200 KG/CM2 KG VER HOJA DE METRADOS ACERO 0.00 430.83
06.04.03 TECHOS
06.04.03.1 CONCRETO ARMADO 210 KG/CM2 M3 2.37
RESERVORIO 1 5.20 0.10 3.70 1.92
CAMARA DE VALVULAS 1 1.95 0.10 2.30 0.45
06.06.00 ACCESORIOS
06.06.01 TEE PVC DN 50X50 (2") PARA AGUA 1 1.00 1.00
06.06.02 CODO PVC SP DE 2" X 90° PARA AGUA 5 5.00 5.00
06.06.03 VALVULA COMPUERTA DE BRONCE 2" 4 4.00 4.00
06.06.04 INST. VALVULAS COMPUERTA DE BRONCE HASTA 50M 4 4.00 4.00
06.06.05 UNION UNIVERSAL PVC 2" PARA AGUA 8 8.00 8.00
06.06.06 CANASTILLA DE PVC DN 50 MM 1 1.00 1.00
HOJA DE METRADO DE RESERVORIO DE ALMACENAMIENTO
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008
METRADO DE ACERO
Ø -------> 1/4 '' 3/8 '' 1/2 '' 5/8 '' 3/4 '' 1 '' Sub
PARTIDA DESCRIPCION Und Total
kg/m -------> 0.25 0.58 1.02 1.60 2.26 4.04 Total
0.320 0.580 1.020 1.600 2.340 4.100
RESERVORIO DE ALMACENAMIENTO
06.04.01.3 ACERO CORTADO Y TRABAJADO Fy=4200 kg/cm2 203.22
RESERVORIO DE ALMACENAMIENTO
DIRECCION X-X 5.55 1.00 27.00 3/8 '' 5.55 0.58 86.91
DIRECCION Y-Y 4.05 1.00 37.00 3/8 '' 4.05 0.58 86.91
CAMARA DE VALVULAS
DIRECCION X-X 1.95 1.00 13.00 3/8 '' 1.95 0.58 14.70
DIRECCION Y-Y 1.95 1.00 13.00 3/8 '' 1.95 0.58 14.70
RESERVORIO DE ALMACENAMIENTO
ACERO EN MURO KG
CAMARA DE VALVULAS
ACERO EN MURO KG
RESERVORIO DE ALMACENAMIENTO
DIRECCION X-X 5.45 1.00 27.00 3/8 '' 5.45 0.58 85.35
DIRECCION Y-Y 4.05 1.00 37.00 3/8 '' 4.05 0.58 86.91
CAMARA DE VALVULAS
DIRECCION X-X 1.75 1.00 12.00 3/8 '' 1.75 0.58 12.18
DIRECCION Y-Y 1.75 1.00 12.00 3/8 '' 1.75 0.58 12.18
07.04.00 ACCESORIOS
08.04.00 ACCESORIOS
08.04.01 TAPON DE PVC D=1" (25mm) UND 18 18.00
08.04.02 CODO PVC SP DE 1" X 22.5° PARA AGUA UND 40 40.00
08.04.03 CODO PVC SP DE 1 1/2" X 22.5° PARA AGUA UND 1 1.00
08.04.04 CODO PVC SP DE 1" X 45° PARA AGUA UND 22 22.00
08.04.05 CODO PVC SP DE 1 1/2" X 45° PARA AGUA UND 3 3.00
08.04.06 CODO PVC SP DE 1" X 90° PARA AGUA UND 26 26.00
08.04.07 CODO PVC SP DE 1 1/2" X 90° PARA AGUA UND 1 1.00
08.04.08 TEE PVC SP DE 1" PARA AGUA UND 34 34.00
08.04.09 TEE PVC SP DE 1 1/2" PARA AGUA UND 2 2.00
08.04.10 REDUCCION PVC SP DE 1 1/2" x 1" PARA AGUA UND 5 5.00
08.04.11 VALVULA COMPUERTA DE BRONCE 1" PZA 1 1.00
08.04.12 VALVULA COMPUERTA DE BRONCE 1 1/2" PZA 1 1.00
08.04.13 VALVULA DE PURGA DE BRONCE 1" PZA 2 2.00
08.04.14 DADOS DE ANCLAJE PARA ACCESORIOS UND 156 156.00
08.04.15 INSTALACION DE ACCESORIOS PVC S.P. 2 UND 156 156.00
08.04.16 CAJA DE PROTECCION P/VALV. DE 2" INC/EXCAV., RELLENO UND 4 4.00
E RED DE DISTRIBUCION DE AGUA POTABLE
FECHA : ENE. 2008
Total
3,630.61
3,630.61
3,630.61
3,025.51
3,025.51
3,025.51
3,025.51
3,025.51
2,825.37
200.14
2,825.37
200.14
2,825.37
200.14
18.00
40.00
1.00
22.00
3.00
26.00
1.00
34.00
2.00
5.00
1.00
1.00
2.00
156.00
156.00
4.00
HOJA DE METRADO DE CONEXIONES DOMICILIARIAS
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008
LONG. MEDIDAS
Item DESCRIPCION Und
Nro Veces Largo Alto Ancho