HOJA DE METRADO

OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

LONG. MEDIDAS
Item DESCRIPCION Und Sub Total Total
Nro Veces Largo Alto Ancho Parcial

01.00.00 OBRAS PROVISIONALES DE TODO EL PROYECTO


01.01.00 CASETA DE GUARDIANIA Y ALMACEN M2 40.00 3.00 120.00 120.00
01.02.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 M. M2 3.60 2.40 8.64 8.64
01.03.00 MOVILIZACION/DESMOVILIZACION HERRAMIENTAS A LA OBRA GLB 3 3.00 3.00
01.04.00 TRANSPORTE DE MATERIALES HASTA LA ZONA DE LA OBRA GLB 12 12.00 12.00
01.05.00 TRASLADO DE MATERIALES DE PTO DE LLEGADA A PIE DE OBRA GLB 30 30.00 30.00
01.06.00 PRUEBAS Y/O ENSAYOS DE OBRA
01.06.01 ENSAYO DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO) UND 5 5.00 5.00
01.06.02 PRUEBA DE DISEÑO DE MEZCLA UND 5 5.00 5.00
01.06.03 PRUEBA DE CALIDAD DE CONCRETO (PRUEBA A LA COMPRESION) UND 30 30.00 30.00
02.00.00 CAPTACION
02.01.00 OBRAS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL M2 2,000.00
AREA DE TUBERIA DE DREN TOTAL 1 50.00 40.00 2,000.00
02.01.02 TRAZO Y REPLANTEO INICIAL M2 337.48
CAMARA DE REUNION 1 3.25 2.30 7.48
CAPTACION - DREN PRINCIPAL 1 5.00 2.00 10.00
CAPTACION - DREN 01 1 40.00 2.00 80.00
CAPTACION - DREN 02 1 40.00 2.00 80.00
CAPTACION - DREN 03 1 40.00 2.00 80.00
CAPTACION - DREN 04 1 40.00 2.00 80.00

02.01.02 TRAZO Y REPLANTEO FINAL M2 337.48


CAMARA DE REUNION 1 3.25 2.30 7.48
CAPTACION - DREN PRINCIPAL 1 5.00 2.00 10.00
CAPTACION - DREN 01 1 40.00 2.00 80.00
CAPTACION - DREN 02 1 40.00 2.00 80.00
CAPTACION - DREN 03 1 40.00 2.00 80.00
CAPTACION - DREN 04 1 40.00 2.00 80.00

02.02.00 MOVIENTO DE TIERRAS


02.01.01 EXCAVACION A MANO EN TERRENO NORMAL M3 429.00
CAPTACION - DREN PRINCIPAL 1 5.00 2.00 1.30 13.00
CAPTACION - DREN 01 1 40.00 2.00 1.30 104.00
CAPTACION - DREN 02 1 40.00 2.00 1.30 104.00
CAPTACION - DREN 03 1 40.00 2.00 1.30 104.00
CAPTACION - DREN 04 1 40.00 2.00 1.30 104.00

02.01.02 REFINE Y NIVELACIÓN EN TERRENO NORMAL M2 99.00


CAPTACION - DREN PRINCIPAL 1 5.00 0.60 3.00
CAPTACION - DREN 01 1 40.00 0.60 24.00
CAPTACION - DREN 02 1 40.00 0.60 24.00
CAPTACION - DREN 03 1 40.00 0.60 24.00
CAPTACION - DREN 04 1 40.00 0.60 24.00

02.01.03 RELLENO COMPACTADO C/MATERIAL PROPIO M3 429.00


CAPTACION - DREN PRINCIPAL 1 5.00 2.00 1.30 13.00
CAPTACION - DREN 01 1 40.00 2.00 1.30 104.00
CAPTACION - DREN 02 1 40.00 2.00 1.30 104.00
CAPTACION - DREN 03 1 40.00 2.00 1.30 104.00
CAPTACION - DREN 04 1 40.00 2.00 1.30 104.00

02.01.04 ESPARCIDO DE MATERIAL SOBRANTE M3 257.40


CAPTACION - DREN PRINCIPAL 1 5.00 2.00 0.60 7.80
CAPTACION - DREN 01 1 40.00 2.00 0.60 62.40
CAPTACION - DREN 02 1 40.00 2.00 0.60 62.40
HOJA DE METRADO
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

LONG. MEDIDAS
Item DESCRIPCION Und Sub Total Total
Nro Veces Largo Alto Ancho Parcial

CAPTACION - DREN 03 1 40.00 2.00 0.60 62.40


CAPTACION - DREN 04 1 40.00 2.00 0.60 62.40
HOJA DE METRADO
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

LONG. MEDIDAS
Item DESCRIPCION Und Sub Total Total
Nro Veces Largo Alto Ancho Parcial

02.02.00 MATERIAL FILTRANTE


02.02.01 RELLENO C/GRAVA TAMIZADA 9.5MM A 23MM M3 189.67
CAPA INFERIOR
CAPTACION - DREN PRINCIPAL 1 5.00 0.45 0.76 1.71
CAPTACION - DREN 01 1 40.00 0.45 0.76 13.68
CAPTACION - DREN 02 1 40.00 0.45 0.76 13.68
CAPTACION - DREN 03 1 40.00 0.45 0.76 13.68
CAPTACION - DREN 04 1 40.00 0.45 0.76 13.68
CAPA SUPERIOR
CAPTACION - DREN PRINCIPAL 1 5.00 0.50 1.62 4.04
CAPTACION - DREN 01 1 40.00 0.50 1.62 32.30
CAPTACION - DREN 02 1 40.00 0.50 1.62 32.30
CAPTACION - DREN 03 1 40.00 0.50 1.62 32.30
CAPTACION - DREN 04 1 40.00 0.50 1.62 32.30

02.02.02 RELLENO C/GRAVILLA TAMIZADA 2 A 9MM M3 41.46


CAPTACION - DREN PRINCIPAL 1 5.00 0.25 1.01 1.26
CAPTACION - DREN 01 1 40.00 0.25 1.01 10.05
CAPTACION - DREN 02 1 40.00 0.25 1.01 10.05
CAPTACION - DREN 03 1 40.00 0.25 1.01 10.05
CAPTACION - DREN 04 1 40.00 0.25 1.01 10.05

02.02.03 RELLENO C/ARENA GRUESA TE=0.8-1.0MM CU=1.2-1.4 M3 104.36


CAPTACION - DREN PRINCIPAL 1 5.00 0.50 1.27 3.16
CAPTACION - DREN 01 1 40.00 0.50 1.27 25.30
CAPTACION - DREN 02 1 40.00 0.50 1.27 25.30
CAPTACION - DREN 03 1 40.00 0.50 1.27 25.30
CAPTACION - DREN 04 1 40.00 0.50 1.27 25.30

02.02.04 ENROCADO CON PIEDRA 100MM P/GALERIA FILTRANTE M3 93.80


CAPTACION - DREN PRINCIPAL 1 5.00 0.30 1.90 2.84
CAPTACION - DREN 01 1 40.00 0.30 1.90 22.74
CAPTACION - DREN 02 1 40.00 0.30 1.90 22.74
CAPTACION - DREN 03 1 40.00 0.30 1.90 22.74
CAPTACION - DREN 04 1 40.00 0.30 1.90 22.74

02.02.05 TUBERIA POLIETILENO HDPE SERIE 10 1.5" (PERFORADA) M 165.00


CAPTACION - DREN PRINCIPAL 1 5.00 5.00
CAPTACION - DREN 01 1 40.00 40.00
CAPTACION - DREN 02 1 40.00 40.00
CAPTACION - DREN 03 1 40.00 40.00
CAPTACION - DREN 04 1 40.00 40.00

02.02.06 INST. TUBERIA POLIETILENO HDPE Ø 1.5" M 165.00


CAPTACION - DREN PRINCIPAL 1 5.00 5.00
CAPTACION - DREN 01 1 40.00 40.00
CAPTACION - DREN 02 1 40.00 40.00
CAPTACION - DREN 03 1 40.00 40.00
CAPTACION - DREN 04 1 40.00 40.00
HOJA DE METRADO DE CAMARA DE REUNION
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

LONG. MEDIDAS
Item DESCRIPCION Und Sub Total Total
Nro Veces Largo Alto Ancho Parcial

03.00.00 CAMARA DE REUNION


03.01.00 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL M2 4.25 3.30 14.03 14.03
03.01.02 TRAZO Y REPLANTEO INICIAL M2 4.25 3.30 14.03 14.03
03.01.03 TRAZO Y REPLANTEO FINAL M2 4.25 3.30 14.03 14.03
03.02.00 MOVIENTO DE TIERRAS
03.02.01 EXCAVACION A MANO EN TERRENO NORMAL M3 11.10 11.10
CAMARA DE INSPECCION 1 2.30 1.85 2.30 9.79
CAMARA DE VALVULAS 1 0.95 1.25 1.10 1.31

03.02.01 REFINE Y NIVELACION EN TERRENO NORMAL M2 6.34 6.34


CAMARA DE INSPECCION 1 2.30 2.30 5.29
CAMARA DE VALVULAS 1 0.95 1.10 1.05

03.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 5.01 5.01


CAMARA DE INSPECCION 1 6.45 1.20 0.50 3.87
CAMARA DE VALVULAS 1 2.85 0.80 0.50 1.14

03.02.04 ESPARCIDO DE MAT. EXCEDENTE HASTA D. PROM.= 30.00 m. M3


Coef. De expojamiento 1.3 1 V= 6.09 7.92 7.92

03.03.00 CONCRETO SIMPLE


03.03.01 SOLADO Cº SIMPLE E=4" F'C=100 KG/CM2 M3 0.63 0.63
CAMARA DE INSPECCION 1 2.30 0.10 2.30 0.53
CAMARA DE VALVULAS 1 0.95 0.10 1.10 0.10

03.04.00 CONCRETO ARMADO M3


03.04.01 CONCRETO ARMADO 210 KG/CM2 4.05
MUROS 2.47
CAMARA DE INSPECCION 2 2.30 1.60 0.15 1.10
CAMARA DE INSPECCION 2 2.00 1.60 0.15 0.96
CAMARA DE VALVULAS 2 0.95 1.00 0.15 0.29
CAMARA DE VALVULAS 1 0.80 1.00 0.15 0.12
PISO 0.95
CAMARA DE INSPECCION 1 2.30 0.15 2.30 0.79
CAMARA DE VALVULAS 1 0.95 0.15 1.10 0.16
TECHO 0.63
CAMARA DE INSPECCION 1 2.30 0.10 2.30 0.53
CAMARA DE VALVULAS 1 0.95 0.10 1.10 0.10

03.04.02 ENCOFRADO Y DESENCOFRADO M2 46.24


MUROS 38.95
CAMARA DE INSPECCION 4 2.15 1.85 15.91
CAMARA DE INSPECCION 4 2.15 1.85 15.91
CAMARA DE VALVULAS 4 0.95 1.25 4.75
CAMARA DE VALVULAS 2 0.95 1.25 2.38
PISO 0.98
CAMARA DE INSPECCION 1 4.60 0.15 0.69
CAMARA DE VALVULAS 2 0.95 0.15 0.29
TECHO 6.31
CAMARA DE INSPECCION 1 2.00 2.00 4.00
CAMARA DE VALVULAS 1 0.80 0.80 0.64
ALERO C. DE INSPECCION 1 9.20 0.00 0.00
ALERO C. DE VALVULAS 2 0.95 0.00 0.00
FRISO C. DE INSPECCION 1 9.20 0.15 1.38
FRISO C. DE VALVULAS 2 0.95 0.15 0.29
HOJA DE METRADO DE CAMARA DE REUNION
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

LONG. MEDIDAS
Item DESCRIPCION Und Sub Total Total
Nro Veces Largo Alto Ancho Parcial

03.04.03 ACERO KG VER HOJA DE METRADOS ACERO 0.00 415.61

03.05.00 REVOQUES ENLUCIDOS Y MOLDURAS


03.05.01 TARRAJEO CON IMPERMEABILIZANTE, MURO Y PISO INTERIOR M2 28.77
MUROS 19.49
CAMARA DE INSPECCION 2 2.15 1.85 0.00 7.96
CAMARA DE INSPECCION 2 2.15 1.85 0.00 7.96
CAMARA DE VALVULAS 2 0.95 1.25 0.00 2.38
CAMARA DE VALVULAS 1 0.95 1.25 0.00 1.19
PISO 0.00 0.00 0.00 0.00 4.64
CAMARA DE INSPECCION 1 2.00 2.00 4.00
CAMARA DE VALVULAS 1 0.80 0.80 0.64
TECHO 0.00 0.00 0.00 4.64
CAMARA DE INSPECCION 1 2.00 0.00 2.00 4.00
CAMARA DE VALVULAS 1 0.80 0.00 0.80 0.64

03.06.00 VALVULAS Y ACCESORIOS

03.06.01 TAPA DE INSPECCION DE 0,60X0,60 INC. BISAGRA Y CANDADO UND 2 2.00 2.00

03.06.02 TUBO DE VENTILACION FºGº 4" UND 2 2.00 2.00


03.06.03 VALVULA COMPUERTA DE BRONCE 3" UND 1 1.00 1.00
03.06.04 INST. VALVULA COMPUERTA DE BRONCE UND 2 2.00 2.00
03.06.05 BRIDA ACERO PARA SOLDAR ROMPE-AGUA 2" (50 MM) UND 2 2.00 2.00
03.06.06 INST. BRIDA AC.P/SOLDAR ROMPE UND 3 3.00 3.00
03.06.07 CANASTILLA DE BRONCE 1 1/2" ROSCADA UND 1 1.00 1.00
03.06.08 INSTALACION DE CANASTILLA BRONCE ROSCADO 1 1/2" UND 1 1.00 1.00
03.06.09 TEE PVC SP DE 3" PARA AGUA UND 1 1.00 1.00
03.06.10 CODO PVC SP DE 3" X 90° PARA AGUA UND 3 3.00 3.00
03.06.11 UNION UNIVERSAL PVC 3" (75MM) PARA AGUA UND 4 4.00 4.00
03.06.12 ESCALINES FºFº F=3/4" ML 1.00 1.00 1.00
HOJA DE METRADO DE ACERO
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

METRADO DE ACERO
Ø -------> 1/4 '' 3/8 '' 1/2 '' 5/8 '' 3/4 '' 1 '' Sub
PARTIDA DESCRIPCION Und Total
kg/m -------> 0.25 0.58 1.02 1.60 2.26 4.04 Total
Corte de acero Nro. ElemNro. Veces Ø Longitug kg/m Parcial

CAMARA DE REUNION
03.04.03 ACERO CORTADO Y TRABAJADO Fy=4200 kg/cm2

A CAMARA DE INSPECCION

ACERO EN MURO KG

Direccion Y-Y 102.28

HORIZONTAL 2.75 2.00 16.00 3/8 '' 2.75 0.58 51.04

VERTICAL 2.33 2.00 19.00 3/8 '' 2.33 0.58 51.24

Direccion X-X 102.28

HORIZONTAL 2.75 2.00 16.00 3/8 '' 2.75 0.58 51.04

VERTICAL 2.33 2.00 19.00 3/8 '' 2.33 0.58 51.24

ACERO PISO KG 60.62

DIRECCION X-X 2.75 1.00 19.00 3/8 '' 2.75 0.58 30.31

DIRECCION Y-Y 2.75 1.00 19.00 3/8 '' 2.75 0.58 30.31

ACERO EN TECHO KG 65.11

DIRECCION X-X 2.75 1.00 19.00 3/8 '' 2.75 0.58 30.31

DIRECCION Y-Y 2.75 1.00 19.00 3/8 '' 2.75 0.58 30.31

REFUERZO EN TAPAS 1.00 4.00 1/2 '' 1.10 1.02 4.49

B CAMARA DE VALVULAS

ACERO EN MURO KG

Direccion Y-Y 21.80

HORIZONTAL 1.55 1.00 12.00 3/8 '' 1.55 0.58 10.79

VERTICAL 1.73 1.00 11.00 3/8 '' 1.73 0.58 11.01

Direccion X-X 43.59

HORIZONTAL 1.55 2.00 12.00 3/8 '' 1.55 0.58 21.58

VERTICAL 1.73 2.00 11.00 3/8 '' 1.73 0.58 22.01

ACERO PISO KG 7.72

DIRECCION X-X 0.95 1.00 7.00 3/8 '' 0.95 0.58 3.86

DIRECCION Y-Y 0.95 1.00 7.00 3/8 '' 0.95 0.58 3.86

ACERO EN TECHO KG 12.21

DIRECCION X-X 0.95 1.00 7.00 3/8 '' 0.95 0.58 3.86

DIRECCION Y-Y 0.95 1.00 7.00 3/8 '' 0.95 0.58 3.86

REFUERZO EN TAPAS 1.00 4.00 1/2 '' 1.10 1.02 4.49


415.61
HOJA DE METRADO DE LINEA DE CONDUCCION
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

LONG. MEDIDAS
Item DESCRIPCION Und Sub Total Total
Nro Veces Largo Alto Ancho Parcial

04.00.00 LINEA DE CONDUCCION


04.01.00 OBRAS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL M2 4,086.29 2.00 8,172.58 8,172.58
04.01.02 TRAZO Y REPLANTEO INICIAL M2 4,086.29 2.00 8,172.58 8,172.58
04.01.03 TRAZO Y REPLANTEO FINAL M2 4,086.29 2.00 8,172.58 8,172.58
04.02.00 MOVIENTO DE TIERRAS
EXCAVACION DE ZANJAS DE Hprom = 1.00 m. DE PROF. EN TERRENO
04.02.01 M3 Ver cuadro de Movimiento de Tierra 134.26 134.26
TIPO NORMAL
EXCAVACION DE ZANJAS DE Hprom = 1.00 m. DE PROF. EN TERRENO
04.02.02 M3 Ver cuadro de Movimiento de Tierra 1,255.82 1,255.82
TIPO SEMIROCA
EXCAVACION DE ZANJAS DE Hprom = 1.00 m. DE PROF. EN TERRENO
04.02.03 M3 Ver cuadro de Movimiento de Tierra 732.37 732.37
TIPO ROCA

04.02.04 REFINE Y NIVELACION EN TERRENO NORMAL ML


De la Progresiva 0+000 hasta 4+086.29 4,086.29 4,086.29 4,086.29

04.02.05 CAMA DE ARENA MANUAL E=0.10 M ZANJA P/TUB HASTA 50MM ML


De la Progresiva 0+000 hasta 4+086.29 4,086.29 4,086.29 4,086.29

04.02.06 RELLENO ZANJA MAT.SELECC.COMPACT. P/TUB 1/2"-2" H=0.80M ML


De la Progresiva 0+000 hasta 4+086.29 4,086.29 4,086.29 4,086.29

04.02.07 ESPARCIDO DE MATERIAL SOBRANTE P/TUB. HASTA 2" (50MM) ML


De la Progresiva 0+000 hasta 4+086.29 4,086.29 4,086.29 4,086.29
HOJA DE METRADO DE LINEA DE CONDUCCION
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

LONG. MEDIDAS
Item DESCRIPCION Und Sub Total Total
Nro Veces Largo Alto Ancho Parcial

04.03.00 SUM E INST DE TUBERIA


04.03.01 TUBERIA P.V.C. UF C-10 Ø2" (50mm) SUMINISTRO ML Ver cuadro de Linea de Conduccion 690.00 690.00
04.03.02 TUBERIA P.V.C. AGUA POTABLE C-10 Ø1 1/2" (35mm) SUMINISTRO ML Ver cuadro de Linea de Conduccion 36.29 36.29
04.03.03 TUBERIA P.V.C. UF C-7.5 Ø2" (50mm) SUMINISTRO ML Ver cuadro de Linea de Conduccion 1,560.00 1,560.00
04.03.04 TUBERIA P.V.C. AGUA POTABLE C-7.5 Ø1 1/2" (35mm) SUMINISTRO ML Ver cuadro de Linea de Conduccion 1,800.00 1,800.00
04.03.05 INST. TUBERIA PVC UF 2" (50mm) ML Sumatoria de tub. 2" 2,250.00 2,250.00
04.03.06 INST. TUBERIA PVC P/AGUA 1 1/2" (35mm) PRESION ML Sumatoria de tub. 1 1/2" 1,836.29 1,836.29
04.03.07 PRUEBA HIDR.+DESINFEC.DE TUB. ZANJA TAPADA 2" (50MM) ML Idem 04.03.05 2,250.00 2,250.00
04.03.08 PRUEBA HIDR.+DESINFEC.DE TUB. ZANJA TAPADA 1 1/2" (35MM) ML Idem 04.03.05 1,836.29 1,836.29

04.04.00 SUM E INST DE ACCESORIOS


04.04.01 CODO PVC SP DE 2" x 90° PARA AGUA UND 24 24 24.00
04.04.02 CODO PVC SP DE 2" x 45° PARA AGUA UND 9 9 9.00
04.04.03 CODO PVC SP DE 2" x 22.5° PARA AGUA UND 16 16 16.00
04.04.04 CODO PVC SP DE 1 1/2" x 90° PARA AGUA UND 70 70 70.00
04.04.05 CODO PVC SP DE 1 1/2" x 45° PARA AGUA UND 10 10 10.00
04.04.06 CODO PVC SP DE 1 1/2" x 22.5° PARA AGUA UND 18 18 18.00
04.04.07 INST. DE ACCESORIOS PVC S.P. HASTA 50MM UND 147 147 147.00
CUADRO DE LINEA DE CONDUCCION

OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10

0+000 3720.100 3719.400 0.70 50% 50% 4.45 CA. CAP.


0+010 10.00 3715.053 3714.253 0.80 50% 50% 4.68 2 C-7.5 10 0 0 0
0+020 10.00 3713.195 3712.485 0.71 50% 50% 4.84 2 C-7.5 10 0 0 0
0+030 10.00 3711.491 3710.781 0.71 50% 50% 4.53 2 C-7.5 10 0 0 0
0+040 10.00 3709.345 3708.645 0.70 50% 50% 4.53 2 C-7.5 10 0 0 0
0+050 10.00 3709.620 3708.921 0.70 50% 50% 4.53 2 C-7.5 10 0 0 0
0+060 10.00 3709.645 3708.851 0.79 50% 50% 5.00 2 C-7.5 10 0 0 0
0+070 10.00 3706.727 3705.994 0.73 50% 50% 5.21 2 C-7.5 10 0 0 0
0+080 10.00 3704.036 3703.281 0.76 50% 50% 5.05 2 C-7.5 10 0 0 0
0+090 10.00 3707.597 3706.891 0.71 50% 50% 5.16 2 C-7.5 10 0 0 0 VAL AIRE
0+100 10.00 3702.739 3702.080 0.66 50% 50% 4.74 2 C-7.5 10 0 0 0
0+110 10.00 3698.516 3697.810 0.71 50% 50% 4.21 2 C-7.5 10 0 0 0
0+120 10.00 3697.224 3696.518 0.71 50% 50% 4.11 2 C-7.5 10 0 0 0
0+130 10.00 3694.458 3693.755 0.70 50% 50% 4.47 2 C-7.5 10 0 0 0
0+140 10.00 3683.630 3693.679 0.00 50% 50% 2.42 2 C-7.5 10 0 0 0 VAL PUR
0+150 10.00 3695.418 3694.729 0.69 50% 50% 2.26 2 C-7.5 10 0 0 0
0+160 10.00 3695.456 3694.789 0.67 50% 50% 4.42 2 C-7.5 10 0 0 0
0+170 10.00 3695.494 3694.848 0.65 50% 50% 4.26 2 C-7.5 10 0 0 0
0+180 10.00 3695.035 3694.332 0.70 50% 50% 5.00 2 C-7.5 10 0 0 0
0+190 10.00 3695.577 3694.869 0.71 50% 50% 5.37 2 C-7.5 10 0 0 0
0+200 10.00 3693.759 3693.120 0.64 50% 50% 4.68 2 C-7.5 10 0 0 0
0+210 10.00 3691.534 3690.929 0.61 50% 50% 4.21 2 C-7.5 10 0 0 0
0+220 10.00 3690.216 3689.554 0.66 50% 50% 4.32 2 C-7.5 10 0 0 0
0+230 10.00 3690.410 3689.713 0.70 50% 50% 4.89 2 C-7.5 10 0 0 0
0+240 10.00 3690.136 3689.382 0.75 50% 50% 5.21 2 C-7.5 10 0 0 0
0+250 10.00 3689.067 3688.401 0.67 50% 50% 4.84 2 C-7.5 10 0 0 0
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10

0+260 10.00 3687.998 3687.421 0.58 50% 50% 4.05 2 C-7.5 10 0 0 0


0+270 10.00 3687.070 3686.441 0.63 50% 50% 3.84 2 C-7.5 10 0 0 0
0+280 10.00 3686.195 3685.460 0.74 50% 50% 4.37 2 C-7.5 10 0 0 0
0+290 10.00 3685.233 3684.480 0.75 50% 50% 4.79 2 C-7.5 10 0 0 0
0+300 10.00 3685.509 3684.808 0.70 50% 50% 4.63 2 C-7.5 10 0 0 0
0+310 10.00 3685.295 3684.612 0.68 50% 50% 4.42 2 C-7.5 10 0 0 0
0+320 10.00 3685.188 3684.551 0.64 50% 50% 4.21 2 C-7.5 10 0 0 0
0+330 10.00 3682.549 3681.894 0.66 50% 50% 4.16 2 C-7.5 10 0 0 0
0+340 10.00 3684.553 3683.565 0.99 50% 50% 5.84 2 C-7.5 10 0 0 0 VAL AIRE
0+350 10.00 3685.496 3684.799 0.70 50% 50% 5.95 2 C-7.5 10 0 0 0
0+360 10.00 3685.456 3684.962 0.49 50% 50% 3.84 2 C-7.5 10 0 0 0
0+370 10.00 3685.626 3684.926 0.70 50% 50% 3.95 2 C-7.5 10 0 0 0
0+380 10.00 3684.314 3683.564 0.75 50% 50% 4.89 2 C-7.5 10 0 0 0
0+390 10.00 3682.328 3681.619 0.71 50% 50% 4.84 2 C-7.5 10 0 0 0
0+400 10.00 3681.729 3681.029 0.70 50% 50% 4.68 2 C-7.5 10 0 0 0
0+410 10.00 3680.249 3679.530 0.72 50% 50% 4.63 2 C-7.5 10 0 0 0
0+420 10.00 3680.748 3680.129 0.62 50% 50% 4.16 2 C-7.5 10 0 0 0
0+430 10.00 3680.112 3679.274 0.84 50% 50% 5.11 2 C-7.5 10 0 0 0
0+440 10.00 3679.140 3678.376 0.76 50% 50% 6.05 2 C-7.5 10 0 0 0
0+450 10.00 3676.187 3675.267 0.92 50% 50% 6.21 2 C-7.5 10 0 0 0
0+460 10.00 3670.008 3669.148 0.86 50% 50% 6.42 2 C-7.5 10 0 0 0
0+470 10.00 3664.151 3663.360 0.79 50% 50% 6.11 2 C-10 0 10 0 0
0+480 10.00 3658.888 3658.097 0.79 50% 50% 6.11 2 C-10 0 10 0 0
0+490 10.00 3655.519 3654.869 0.65 50% 50% 5.53 2 C-10 0 10 0 0
0+500 10.00 3655.330 3654.809 0.52 50% 50% 4.32 2 C-10 0 10 0 0
0+510 10.00 3655.290 3654.748 0.54 50% 50% 3.63 2 C-10 0 10 0 0
0+520 10.00 3655.319 3654.687 0.63 50% 50% 4.00 2 C-10 0 10 0 0
0+530 10.00 3655.896 3655.179 0.72 50% 50% 4.74 2 C-10 0 10 0 0
0+540 10.00 3655.755 3655.126 0.63 50% 50% 4.63 2 C-10 0 10 0 0
0+550 10.00 3655.609 3655.052 0.56 50% 50% 3.84 2 C-10 0 10 0 0
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10

0+560 10.00 3655.523 3654.979 0.54 50% 50% 3.58 2 C-10 0 10 0 0


0+570 10.00 3655.612 3654.905 0.71 50% 50% 4.53 2 C-10 0 10 0 0
0+580 10.00 3655.713 3654.832 0.88 50% 50% 6.21 2 C-10 0 10 0 0
0+590 10.00 3655.815 3654.758 1.06 50% 50% 7.95 2 C-10 0 10 0 0
0+600 10.00 3655.887 3654.684 1.20 50% 50% 9.58 2 C-10 0 10 0 0
0+610 10.00 3655.632 3654.611 1.02 20% 80% 9.37 2 C-10 0 10 0 0
0+620 10.00 3649.245 3650.354 0.00 20% 80% 4.21 2 C-10 0 10 0 0
0+630 10.00 3640.169 3650.354 0.00 20% 80% 0.00 2 C-10 0 10 0 0 VAL PUR
0+640 10.00 3650.969 3650.354 0.62 20% 80% 1.74 2 C-10 0 10 0 0
0+650 10.00 3652.928 3652.348 0.58 20% 80% 3.58 2 C-10 0 10 0 0
0+660 10.00 3656.339 3655.486 0.85 20% 80% 4.63 2 C-10 0 10 0 0
0+670 10.00 3659.367 3658.618 0.75 20% 80% 5.32 2 C-10 0 10 0 0 VAL AIRE
0+680 10.00 3659.593 3658.803 0.79 20% 80% 5.26 2 C-10 0 10 0 0
0+690 10.00 3659.544 3658.767 0.78 20% 80% 5.42 2 C-10 0 10 0 0
0+700 10.00 3659.215 3658.507 0.71 20% 80% 5.00 2 C-10 0 10 0 0
0+710 10.00 3657.728 3657.020 0.71 20% 80% 4.63 2 C-10 0 10 0 0
0+720 10.00 3656.241 3655.533 0.71 20% 80% 4.63 2 C-10 0 10 0 0
0+730 10.00 3653.810 3653.136 0.67 20% 80% 5.00 2 C-10 0 10 0 0
0+740 10.00 3651.559 3650.852 0.71 20% 80% 5.53 2 C-10 0 10 0 0
0+750 10.00 3651.576 3650.809 0.77 20% 80% 6.00 2 C-10 0 10 0 0
0+760 10.00 3640.488 3637.365 3.12 20% 80% 21.37 2 C-10 0 10 0 0
0+770 10.00 3624.975 3630.490 0.00 20% 80% 18.21 2 C-10 0 10 0 0 VAL PUR
0+780 10.00 3631.244 3630.390 0.85 20% 80% 3.32 2 C-10 0 10 0 0
0+790 10.00 3631.129 3630.290 0.84 20% 80% 6.53 2 C-10 0 10 0 0
0+800 10.00 3629.103 3628.371 0.73 20% 80% 6.11 2 C-10 0 10 0 0
0+810 10.00 3626.713 3626.001 0.71 20% 80% 5.79 2 C-10 0 10 0 0
0+820 10.00 3627.428 3626.727 0.70 20% 80% 5.79 2 C-10 0 10 0 0
0+830 10.00 3626.917 3626.194 0.72 20% 80% 5.89 2 C-10 0 10 0 0
0+840 10.00 3629.431 3628.531 0.90 20% 80% 6.32 2 C-10 0 10 0 0
0+850 10.00 3640.044 3639.024 1.02 20% 80% 7.21 2 C-10 0 10 0 0
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10

0+860 10.00 3647.285 3646.455 0.83 20% 80% 6.58 2 C-10 0 10 0 0


0+870 10.00 3650.357 3649.310 1.05 20% 80% 6.74 2 C-10 0 10 0 0
0+880 10.00 3652.240 3651.494 0.75 20% 80% 6.53 2 C-10 0 10 0 0
0+890 10.00 3654.459 3653.678 0.78 20% 80% 5.11 2 C-10 0 10 0 0
0+900 10.00 3656.587 3655.861 0.73 20% 80% 5.00 2 C-10 0 10 0 0
0+910 10.00 3659.058 3658.289 0.77 20% 80% 5.05 2 C-10 0 10 0 0
0+920 10.00 3661.575 3660.772 0.80 20% 80% 5.68 2 C-10 0 10 0 0
0+930 10.00 3664.760 3663.697 1.06 20% 80% 7.21 2 C-10 0 10 0 0
0+940 10.00 3667.173 3666.456 0.72 20% 80% 6.79 2 C-10 0 10 0 0 VAL AIRE
0+950 10.00 3667.522 3666.614 0.91 20% 80% 6.11 2 C-10 0 10 0 0
0+960 10.00 3666.968 3666.267 0.70 20% 80% 6.00 2 C-10 0 10 0 0
0+970 10.00 3665.443 3664.734 0.71 20% 80% 4.95 2 C-10 0 10 0 0
0+980 10.00 3665.622 3664.906 0.72 20% 80% 5.00 2 C-10 0 10 0 0
0+990 10.00 3664.921 3664.212 0.71 20% 80% 4.95 2 C-10 0 10 0 0
1+000 10.00 3663.125 3662.404 0.72 20% 80% 4.89 2 C-10 0 10 0 0
1+010 10.00 3661.329 3660.595 0.73 20% 80% 4.74 2 C-10 0 10 0 0
1+020 10.00 3662.624 3661.924 0.70 20% 80% 6.00 2 C-10 0 10 0 0
1+030 10.00 3662.876 3662.176 0.70 20% 80% 7.47 2 C-10 0 10 0 0
1+040 10.00 3662.321 3661.666 0.65 20% 80% 5.84 2 C-10 0 10 0 0
1+050 10.00 3663.221 3662.665 0.56 20% 80% 4.16 2 C-10 0 10 0 0
1+060 10.00 3663.788 3663.039 0.75 20% 80% 4.47 2 C-10 0 10 0 0
1+070 10.00 3663.062 3662.572 0.49 20% 80% 3.95 2 C-10 0 10 0 0
1+080 10.00 3662.302 3661.562 0.74 20% 80% 4.00 2 C-10 0 10 0 0
1+090 10.00 3662.646 3661.946 0.70 20% 80% 4.89 2 C-10 0 10 0 0
1+100 10.00 3662.204 3661.504 0.70 20% 80% 4.84 2 C-10 0 10 0 0
1+110 10.00 3660.983 3660.264 0.72 20% 80% 4.89 2 C-10 0 10 0 0
1+120 10.00 3662.730 3662.235 0.49 20% 80% 4.05 2 C-10 0 10 0 0
1+130 10.00 3664.907 3664.276 0.63 20% 80% 3.58 2 C-10 0 10 0 0
1+140 10.00 3666.765 3666.013 0.75 20% 80% 4.68 2 C-10 0 10 0 0
1+150 10.00 3668.325 3667.626 0.70 20% 80% 5.05 2 C-10 0 10 0 0
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10

1+160 10.00 3669.966 3669.240 0.73 20% 80% 4.79 2 C-7.5 10 0 0 0


1+170 10.00 3670.772 3670.064 0.71 20% 80% 4.74 2 C-7.5 10 0 0 0
1+180 10.00 3672.016 3671.309 0.71 20% 80% 4.63 2 C-7.5 10 0 0 0
1+190 10.00 3672.502 3671.793 0.71 20% 80% 4.68 2 C-7.5 10 0 0 0
1+200 10.00 3673.387 3672.697 0.69 20% 80% 4.63 2 C-7.5 10 0 0 0
1+210 10.00 3674.362 3673.685 0.68 20% 80% 4.47 2 C-7.5 10 0 0 0
1+220 10.00 3676.462 3675.720 0.74 20% 80% 4.68 2 C-7.5 10 0 0 0
1+230 10.00 3678.783 3677.996 0.79 20% 80% 5.26 2 C-7.5 10 0 0 0
1+240 10.00 3681.154 3680.271 0.88 20% 80% 6.05 2 C-7.5 10 0 0 0
1+250 10.00 3683.414 3682.547 0.87 20% 80% 6.16 2 C-7.5 10 0 0 0 VAL AIRE
1+260 10.00 3683.505 3682.837 0.67 20% 80% 5.00 2 C-7.5 10 0 0 0
1+270 10.00 3683.406 3682.751 0.65 20% 80% 4.32 2 C-7.5 10 0 0 0
1+280 10.00 3683.212 3682.503 0.71 20% 80% 4.79 2 C-7.5 10 0 0 0
1+290 10.00 3683.546 3682.845 0.70 20% 80% 5.00 2 C-7.5 10 0 0 0
1+300 10.00 3683.365 3682.694 0.67 20% 80% 4.68 2 C-7.5 10 0 0 0
1+310 10.00 3682.352 3681.710 0.64 20% 80% 4.47 2 C-7.5 10 0 0 0
1+320 10.00 3681.202 3680.570 0.63 20% 80% 4.37 2 C-7.5 10 0 0 0
1+330 10.00 3680.076 3679.430 0.65 20% 80% 4.42 2 C-7.5 10 0 0 0
1+340 10.00 3679.328 3678.590 0.74 20% 80% 4.79 2 C-7.5 10 0 0 0
1+350 10.00 3679.231 3678.568 0.66 20% 80% 4.74 2 C-7.5 10 0 0 0
1+360 10.00 3679.221 3678.546 0.68 20% 80% 4.47 2 C-7.5 10 0 0 0
1+370 10.00 3679.226 3678.352 0.87 20% 80% 5.47 2 C-7.5 10 0 0 0
1+380 10.00 3678.481 3677.814 0.67 20% 80% 5.42 2 C-7.5 10 0 0 0
1+390 10.00 3677.647 3677.092 0.55 20% 80% 3.95 2 C-7.5 10 0 0 0
1+400 10.00 3677.558 3676.665 0.89 20% 80% 4.95 2 C-7.5 10 0 0 0
1+410 10.00 3677.517 3676.670 0.85 50% 50% 6.16 2 C-7.5 10 0 0 0
1+420 10.00 3677.459 3676.675 0.78 50% 50% 5.63 2 C-7.5 10 0 0 0
1+430 10.00 3677.368 3676.680 0.69 50% 50% 4.89 2 C-7.5 10 0 0 0
1+440 10.00 3677.545 3676.789 0.76 50% 50% 4.84 2 C-7.5 10 0 0 0
1+450 10.00 3678.344 3677.660 0.68 50% 50% 4.89 2 C-7.5 10 0 0 0
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10

1+460 10.00 3679.718 3679.013 0.70 50% 50% 4.63 2 C-7.5 10 0 0 0


1+470 10.00 3681.160 3680.367 0.79 50% 50% 5.11 2 C-7.5 10 0 0 0
1+480 10.00 3682.527 3681.720 0.81 50% 50% 5.84 2 C-7.5 10 0 0 0
1+490 10.00 3683.662 3682.967 0.69 50% 50% 5.47 2 C-7.5 10 0 0 0
1+500 10.00 3683.537 3682.818 0.72 50% 50% 5.00 2 C-7.5 10 0 0 0
1+510 10.00 3683.772 3683.224 0.55 50% 50% 4.42 2 C-7.5 10 0 0 0
1+520 10.00 3686.325 3685.565 0.76 50% 50% 4.53 2 C-7.5 10 0 0 0
1+530 10.00 3686.598 3686.056 0.54 50% 50% 4.42 2 C-7.5 10 0 0 0
1+540 10.00 3686.614 3686.040 0.57 50% 50% 3.53 2 C-7.5 10 0 0 0
1+550 10.00 3686.659 3686.024 0.64 50% 50% 3.89 2 C-7.5 10 0 0 0
1+560 10.00 3686.725 3686.008 0.72 50% 50% 4.47 2 C-7.5 10 0 0 0
1+570 10.00 3687.482 3686.644 0.84 50% 50% 5.47 2 C-7.5 10 0 0 0
1+580 10.00 3689.291 3688.577 0.71 50% 50% 5.53 2 C-7.5 10 0 0 0
1+590 10.00 3689.520 3688.760 0.76 50% 50% 5.16 2 C-7.5 10 0 0 0
1+600 10.00 3689.587 3688.884 0.70 50% 50% 5.00 2 C-7.5 10 0 0 0
1+610 10.00 3688.674 3687.971 0.70 30% 70% 4.63 2 C-7.5 10 0 0 0
1+620 10.00 3688.573 3687.878 0.69 30% 70% 4.63 2 C-7.5 10 0 0 0
1+630 10.00 3688.482 3687.787 0.70 30% 70% 4.63 2 C-7.5 10 0 0 0
1+640 10.00 3691.739 3690.618 1.12 30% 70% 7.53 2 C-7.5 10 0 0 0
1+650 10.00 3699.259 3698.519 0.74 30% 70% 8.11 2 C-7.5 10 0 0 0
1+660 10.00 3702.693 3701.953 0.74 30% 70% 5.79 2 C-7.5 10 0 0 0
1+670 10.00 3707.095 3706.383 0.71 30% 70% 5.00 2 C-7.5 10 0 0 0
1+680 10.00 3703.692 3702.825 0.87 30% 70% 6.11 2 C-7.5 10 0 0 0 VAL AIRE
1+690 10.00 3696.732 3695.889 0.84 30% 70% 7.37 2 C-7.5 10 0 0 0 VAL PUR
1+700 10.00 3696.512 3695.795 0.72 30% 70% 5.84 2 C-7.5 10 0 0 0
1+710 10.00 3696.662 3695.957 0.70 50% 50% 4.84 2 C-7.5 10 0 0 0
1+720 10.00 3698.514 3697.745 0.77 50% 50% 4.84 2 C-7.5 10 0 0 0
1+730 10.00 3702.657 3701.858 0.80 50% 50% 5.16 2 C-7.5 10 0 0 0
1+740 10.00 3702.587 3701.848 0.74 50% 50% 5.11 2 C-7.5 10 0 0 0
1+750 10.00 3703.331 3702.627 0.70 50% 50% 4.63 2 C-7.5 10 0 0 0
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10

1+760 10.00 3703.743 3703.043 0.70 50% 50% 4.42 2 C-7.5 10 0 0 0


1+770 10.00 3704.069 3703.346 0.72 50% 50% 4.53 2 C-7.5 10 0 0 0
1+780 10.00 3704.637 3703.880 0.76 50% 50% 4.79 2 C-7.5 10 0 0 0
1+790 10.00 3705.422 3704.722 0.70 50% 50% 4.84 2 C-7.5 10 0 0 0
1+800 10.00 3705.343 3704.643 0.70 50% 50% 4.74 2 C-7.5 10 0 0 0
1+810 10.00 3705.631 3704.917 0.71 50% 50% 4.79 2 C-7.5 10 0 0 0
1+820 10.00 3706.152 3705.415 0.74 50% 50% 4.95 2 C-7.5 10 0 0 0
1+830 10.00 3706.451 3705.761 0.69 50% 50% 4.84 2 C-7.5 10 0 0 0
1+840 10.00 3706.520 3705.856 0.66 50% 50% 4.47 2 C-7.5 10 0 0 0
1+850 10.00 3706.572 3705.951 0.62 50% 50% 4.21 2 C-7.5 10 0 0 0
1+860 10.00 3706.735 3706.091 0.64 50% 50% 4.16 2 C-7.5 10 0 0 0
1+870 10.00 3707.429 3706.750 0.68 50% 50% 4.37 2 C-7.5 10 0 0 0
1+880 10.00 3707.500 3706.661 0.84 50% 50% 5.21 2 C-7.5 10 0 0 0
1+890 10.00 3707.625 3706.870 0.76 50% 50% 5.47 2 C-7.5 10 0 0 0
1+900 10.00 3707.691 3706.805 0.89 50% 50% 5.63 2 C-7.5 10 0 0 0
1+910 10.00 3707.404 3706.636 0.77 50% 50% 5.68 2 C-7.5 10 0 0 0
1+920 10.00 3708.006 3707.461 0.55 50% 50% 4.32 2 C-7.5 10 0 0 0
1+930 10.00 3709.146 3708.475 0.67 50% 50% 3.32 2 C-7.5 10 0 0 0
1+940 10.00 3708.980 3708.334 0.65 50% 50% 5.47 2 C-7.5 10 0 0 0
1+950 10.00 3699.081 3701.908 0.00 50% 50% 3.89 2 C-7.5 10 0 0 0 VAL PUR
1+960 10.00 3695.246 3701.908 0.00 50% 50% 0.00 2 C-7.5 10 0 0 0
1+970 10.00 3701.244 3701.908 0.00 50% 50% 0.00 2 C-7.5 10 0 0 0
1+980 10.00 3703.278 3702.489 0.79 50% 50% 2.47 2 C-7.5 10 0 0 0
1+990 10.00 3704.170 3703.260 0.91 50% 50% 5.63 2 C-7.5 10 0 0 0
2+000 10.00 3704.722 3703.998 0.72 50% 50% 5.47 2 C-7.5 10 0 0 0 VAL AIRE
2+010 10.00 3702.039 3701.314 0.73 50% 50% 4.63 2 C-7.5 10 0 0 0
2+020 10.00 3699.696 3698.897 0.80 50% 50% 4.95 2 C-7.5 10 0 0 0
2+030 10.00 3697.897 3697.027 0.87 50% 50% 5.58 2 C-7.5 10 0 0 0
2+040 10.00 3695.910 3695.157 0.75 50% 50% 5.37 2 C-7.5 10 0 0 0
2+050 10.00 3695.531 3694.635 0.90 50% 50% 5.53 2 C-7.5 10 0 0 0
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10

2+060 10.00 3695.572 3694.868 0.70 50% 50% 5.32 2 C-7.5 10 0 0 0


2+070 10.00 3695.724 3695.052 0.67 50% 50% 4.32 2 C-7.5 10 0 0 0
2+080 10.00 3695.630 3694.993 0.64 50% 50% 4.11 2 C-7.5 10 0 0 0
2+090 10.00 3695.535 3694.934 0.60 50% 50% 3.89 2 C-7.5 10 0 0 0
2+100 10.00 3695.416 3694.875 0.54 50% 50% 3.58 2 C-7.5 10 0 0 0
2+110 10.00 3695.420 3694.816 0.60 50% 50% 3.58 2 C-7.5 10 0 0 0
2+120 10.00 3695.472 3694.757 0.72 50% 50% 4.16 2 C-7.5 10 0 0 0
2+130 10.00 3695.418 3694.698 0.72 50% 50% 4.58 2 C-7.5 10 0 0 0
2+140 10.00 3695.143 3694.441 0.70 50% 50% 4.53 2 C-7.5 10 0 0 0
2+150 10.00 3694.489 3693.788 0.70 50% 50% 4.42 2 C-7.5 10 0 0 0
2+160 10.00 3693.835 3693.134 0.70 50% 50% 4.37 2 C-7.5 10 0 0 0
2+170 10.00 3692.935 3692.229 0.71 50% 50% 4.32 2 C-7.5 10 0 0 0
2+180 10.00 3691.427 3690.711 0.72 50% 50% 4.42 2 C-7.5 10 0 0 0
2+190 10.00 3689.268 3688.552 0.72 50% 50% 4.53 2 C-7.5 10 0 0 0
2+200 10.00 3687.108 3686.392 0.72 50% 50% 4.53 2 C-7.5 10 0 0 0
2+210 10.00 3684.949 3684.233 0.72 50% 50% 4.53 2 C-7.5 10 0 0 0
2+220 10.00 3682.087 3681.287 0.80 50% 50% 5.05 2 C-7.5 10 0 0 0
2+230 10.00 3679.052 3678.167 0.89 50% 50% 6.00 2 C-7.5 10 0 0 0
2+240 10.00 3676.016 3675.047 0.97 50% 50% 6.84 2 C-7.5 10 0 0 0
2+250 10.00 3672.981 3671.928 1.05 50% 50% 7.74 2 C-7.5 10 0 0 0
3672.981 3671.928 1.05 CR-1
2+260 10.00 3669.544 3668.812 0.73 50% 50% 6.58 1.5 C-7.5 0 0 10 0
2+270 10.00 3666.522 3665.780 0.74 50% 50% 4.95 1.5 C-7.5 0 0 10 0
2+280 10.00 3662.037 3661.268 0.77 50% 50% 5.00 1.5 C-7.5 0 0 10 0
2+290 10.00 3657.498 3656.730 0.77 50% 50% 5.11 1.5 C-7.5 0 0 10 0
2+300 10.00 3654.517 3653.780 0.74 50% 50% 5.05 1.5 C-7.5 0 0 10 0
2+310 10.00 3651.575 3650.843 0.73 50% 50% 4.95 1.5 C-7.5 0 0 10 0
2+320 10.00 3649.841 3649.039 0.80 50% 50% 5.32 1.5 C-7.5 0 0 10 0
2+330 10.00 3649.984 3649.327 0.66 50% 50% 5.11 1.5 C-7.5 0 0 10 0
2+340 10.00 3650.772 3650.007 0.76 50% 50% 4.79 1.5 C-7.5 0 0 10 0
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10

2+350 10.00 3649.950 3649.246 0.70 50% 50% 4.74 1.5 C-7.5 0 0 10 0
2+360 10.00 3649.534 3648.704 0.83 50% 50% 5.32 1.5 C-7.5 0 0 10 0
2+370 10.00 3649.711 3648.970 0.74 50% 50% 5.79 1.5 C-7.5 0 0 10 0
2+380 10.00 3649.697 3648.962 0.74 50% 50% 5.37 1.5 C-7.5 0 0 10 0
2+390 10.00 3649.678 3648.813 0.86 50% 50% 5.95 1.5 C-7.5 0 0 10 0
2+400 10.00 3649.404 3648.896 0.51 50% 50% 4.84 1.5 C-7.5 0 0 10 0
2+410 10.00 3649.436 3648.725 0.71 50% 50% 3.84 1.5 C-7.5 0 0 10 0
2+420 10.00 3647.772 3647.023 0.75 50% 50% 4.68 1.5 C-7.5 0 0 10 0
2+430 10.00 3646.060 3645.321 0.74 50% 50% 4.84 1.5 C-7.5 0 0 10 0
2+440 10.00 3644.553 3643.847 0.71 50% 50% 4.68 1.5 C-7.5 0 0 10 0
2+450 10.00 3643.379 3642.679 0.70 50% 50% 4.63 1.5 C-7.5 0 0 10 0
2+460 10.00 3642.431 3641.731 0.70 50% 50% 4.63 1.5 C-7.5 0 0 10 0
2+470 10.00 3642.610 3641.910 0.70 50% 50% 4.53 1.5 C-7.5 0 0 10 0
2+480 10.00 3642.771 3642.013 0.76 50% 50% 4.68 1.5 C-7.5 0 0 10 0
2+490 10.00 3642.217 3641.517 0.70 50% 50% 5.16 1.5 C-7.5 0 0 10 0
2+500 10.00 3642.167 3641.467 0.70 50% 50% 5.47 1.5 C-7.5 0 0 10 0
2+510 10.00 3642.666 3641.964 0.70 50% 50% 5.47 1.5 C-7.5 0 0 10 0
2+520 10.00 3642.105 3641.370 0.74 50% 50% 5.32 1.5 C-7.5 0 0 10 0
2+530 10.00 3638.902 3638.167 0.74 50% 50% 5.16 1.5 C-7.5 0 0 10 0
2+540 10.00 3636.741 3636.026 0.72 50% 50% 5.00 1.5 C-7.5 0 0 10 0
2+550 10.00 3634.612 3633.896 0.72 50% 50% 4.84 1.5 C-7.5 0 0 10 0
2+560 10.00 3634.646 3633.958 0.69 50% 50% 4.63 1.5 C-7.5 0 0 10 0
2+570 10.00 3634.547 3633.905 0.64 50% 50% 4.26 1.5 C-7.5 0 0 10 0
2+580 10.00 3634.447 3633.852 0.60 50% 50% 3.95 1.5 C-7.5 0 0 10 0
2+590 10.00 3634.463 3633.799 0.66 50% 50% 4.00 1.5 C-7.5 0 0 10 0
2+600 10.00 3634.549 3633.746 0.80 50% 50% 4.89 1.5 C-7.5 0 0 10 0
2+610 10.00 3631.280 3630.566 0.71 50% 50% 5.21 1.5 C-7.5 0 0 10 0 VAL PUR
2+620 10.00 3631.575 3630.874 0.70 50% 50% 4.79 1.5 C-7.5 0 0 10 0
2+630 10.00 3633.481 3632.630 0.85 50% 50% 5.37 1.5 C-7.5 0 0 10 0
2+640 10.00 3637.001 3636.205 0.80 50% 50% 5.74 1.5 C-7.5 0 0 10 0
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10

2+650 10.00 3640.270 3639.613 0.66 50% 50% 4.79 1.5 C-7.5 0 0 10 0 VAL AIRE
2+660 10.00 3640.323 3639.596 0.73 50% 50% 4.21 1.5 C-7.5 0 0 10 0
2+670 10.00 3640.026 3639.295 0.73 50% 50% 4.47 1.5 C-7.5 0 0 10 0
2+680 10.00 3637.125 3636.422 0.70 50% 50% 4.53 1.5 C-7.5 0 0 10 0
2+690 10.00 3633.704 3632.942 0.76 50% 50% 5.42 1.5 C-7.5 0 0 10 0
2+700 10.00 3630.385 3629.665 0.72 50% 50% 5.95 1.5 C-7.5 0 0 10 0
2+710 10.00 3629.527 3628.891 0.64 50% 50% 5.37 1.5 C-7.5 0 0 10 0
2+720 10.00 3626.405 3625.701 0.70 50% 50% 5.58 1.5 C-7.5 0 0 10 0
2+730 10.00 3625.570 3624.870 0.70 50% 50% 5.63 1.5 C-7.5 0 0 10 0
2+740 10.00 3624.717 3624.012 0.70 50% 50% 5.68 1.5 C-7.5 0 0 10 0
2+750 10.00 3622.559 3621.877 0.68 50% 50% 5.58 1.5 C-7.5 0 0 10 0
3622.559 3621.877 0.68 CR-2
2+760 10.00 3621.523 3620.805 0.72 50% 50% 5.00 1.5 C-7.5 0 0 10 0
2+770 10.00 3618.115 3617.500 0.61 50% 50% 4.37 1.5 C-7.5 0 0 10 0
2+780 10.00 3616.607 3615.900 0.71 50% 50% 4.32 1.5 C-7.5 0 0 10 0
2+790 10.00 3614.050 3613.393 0.66 50% 50% 4.47 1.5 C-7.5 0 0 10 0
2+800 10.00 3612.981 3612.275 0.71 50% 50% 4.74 1.5 C-7.5 0 0 10 0
2+810 10.00 3610.186 3609.488 0.70 50% 50% 5.21 1.5 C-7.5 0 0 10 0
2+820 10.00 3609.395 3608.685 0.71 50% 50% 5.21 1.5 C-7.5 0 0 10 0
2+830 10.00 3606.675 3605.975 0.70 50% 50% 5.26 1.5 C-7.5 0 0 10 0
2+840 10.00 3604.218 3603.282 0.94 50% 50% 6.16 1.5 C-7.5 0 0 10 0
2+850 10.00 3602.466 3601.987 0.48 50% 50% 5.05 1.5 C-7.5 0 0 10 0
2+860 10.00 3601.739 3600.978 0.76 50% 50% 4.16 1.5 C-7.5 0 0 10 0
2+870 10.00 3600.169 3599.443 0.73 50% 50% 5.05 1.5 C-7.5 0 0 10 0
2+880 10.00 3598.434 3597.734 0.70 50% 50% 4.79 1.5 C-7.5 0 0 10 0
2+890 10.00 3597.925 3597.035 0.89 50% 50% 5.53 1.5 C-7.5 0 0 10 0
2+900 10.00 3595.120 3594.432 0.69 50% 50% 6.42 1.5 C-7.5 0 0 10 0
2+910 10.00 3593.177 3592.482 0.70 50% 50% 6.53 1.5 C-7.5 0 0 10 0
2+920 10.00 3588.494 3587.720 0.77 50% 50% 6.89 1.5 C-7.5 0 0 10 0
2+930 10.00 3583.672 3582.903 0.77 50% 50% 7.26 1.5 C-7.5 0 0 10 0
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10

2+940 10.00 3582.567 3581.912 0.66 50% 50% 6.74 1.5 C-7.5 0 0 10 0
2+950 10.00 3581.701 3580.784 0.92 50% 50% 8.47 1.5 C-7.5 0 0 10 0
2+960 10.00 3577.621 3576.692 0.93 50% 50% 8.63 1.5 C-7.5 0 0 10 0
2+970 10.00 3574.352 3573.616 0.74 50% 50% 6.42 1.5 C-7.5 0 0 10 0
3574.352 3573.616 0.74 CR-3
2+980 10.00 3570.447 3569.758 0.69 50% 50% 6.11 1.5 C-7.5 0 0 10 0
2+990 10.00 3566.475 3565.814 0.66 50% 50% 5.79 1.5 C-7.5 0 0 10 0
3+000 10.00 3564.384 3563.682 0.70 50% 50% 5.89 1.5 C-7.5 0 0 10 0
3+010 10.00 3561.184 3560.513 0.67 50% 50% 5.84 1.5 C-7.5 0 0 10 0
3+020 10.00 3558.845 3558.109 0.74 50% 50% 5.95 1.5 C-7.5 0 0 10 0
3+030 10.00 3555.742 3555.025 0.72 50% 50% 6.26 1.5 C-7.5 0 0 10 0
3+040 10.00 3555.281 3554.505 0.78 50% 50% 6.47 1.5 C-7.5 0 0 10 0
3+050 10.00 3552.329 3551.656 0.67 50% 50% 6.26 1.5 C-7.5 0 0 10 0
3+060 10.00 3549.653 3548.931 0.72 50% 50% 6.00 1.5 C-7.5 0 0 10 0
3+070 10.00 3547.382 3546.376 1.01 50% 50% 6.84 1.5 C-7.5 0 0 10 0
3+080 10.00 3545.319 3544.630 0.69 50% 50% 6.68 1.5 C-7.5 0 0 10 0
3+090 10.00 3537.874 3537.173 0.70 50% 50% 5.16 1.5 C-7.5 0 0 10 0
3+100 10.00 3535.490 3534.814 0.68 50% 50% 4.58 1.5 C-7.5 0 0 10 0
3+110 10.00 3534.307 3533.536 0.77 50% 50% 4.84 1.5 C-7.5 0 0 10 0
3+120 10.00 3531.067 3530.292 0.78 50% 50% 5.00 1.5 C-7.5 0 0 10 0
3+130 10.00 3526.965 3526.358 0.61 50% 50% 4.68 1.5 C-7.5 0 0 10 0
3+140 10.00 3524.732 3524.028 0.70 50% 50% 4.79 1.5 C-7.5 0 0 10 0
3524.732 3524.028 0.70 CR-4
3+150 10.00 3522.818 3521.884 0.93 50% 50% 5.95 1.5 C-7.5 0 0 10 0
3+160 10.00 3520.431 3519.683 0.75 50% 50% 6.16 1.5 C-7.5 0 0 10 0
3+170 10.00 3519.081 3518.139 0.94 50% 50% 6.42 1.5 C-7.5 0 0 10 0
3+180 10.00 3516.511 3515.807 0.70 50% 50% 6.26 1.5 C-7.5 0 0 10 0
3+190 10.00 3513.183 3512.469 0.71 50% 50% 5.37 1.5 C-7.5 0 0 10 0
3+200 10.00 3509.186 3508.411 0.78 50% 50% 5.53 1.5 C-7.5 0 0 10 0
3+210 10.00 3506.354 3505.633 0.72 50% 50% 5.53 1.5 C-7.5 0 0 10 0
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10

3+220 10.00 3501.037 3500.271 0.77 50% 50% 5.26 1.5 C-7.5 0 0 10 0
3+230 10.00 3496.666 3495.965 0.70 50% 50% 5.11 1.5 C-7.5 0 0 10 0
3+240 10.00 3494.616 3493.913 0.70 50% 50% 5.05 1.5 C-7.5 0 0 10 0
3+250 10.00 3490.801 3490.035 0.77 50% 50% 5.21 1.5 C-7.5 0 0 10 0
3+260 10.00 3488.214 3487.509 0.70 50% 50% 5.32 1.5 C-7.5 0 0 10 0
3+270 10.00 3485.420 3484.681 0.74 50% 50% 5.42 1.5 C-7.5 0 0 10 0
3+280 10.00 3482.346 3481.554 0.79 50% 50% 5.79 1.5 C-7.5 0 0 10 0
3+290 10.00 3480.330 3479.579 0.75 50% 50% 6.79 1.5 C-7.5 0 0 10 0
3+300 10.00 3480.037 3479.353 0.68 50% 50% 7.53 1.5 C-7.5 0 0 10 0
3+310 10.00 3479.795 3479.139 0.66 50% 50% 7.37 1.5 C-7.5 0 0 10 0
3+320 10.00 3476.969 3476.181 0.79 50% 50% 7.84 1.5 C-7.5 0 0 10 0
3476.969 3476.181 0.79 CR-5
3+330 10.00 3472.430 3471.765 0.66 50% 50% 7.21 1.5 C-7.5 0 0 10 0
3+340 10.00 3470.357 3470.101 0.26 50% 50% 4.26 1.5 C-7.5 0 0 10 0
3+350 10.00 3468.744 3468.437 0.31 50% 50% 2.26 1.5 C-7.5 0 0 10 0
3+360 10.00 3467.201 3466.774 0.43 50% 50% 2.37 1.5 C-7.5 0 0 10 0
3+370 10.00 3465.657 3465.110 0.55 50% 50% 3.11 1.5 C-7.5 0 0 10 0
3+380 10.00 3464.114 3463.446 0.67 50% 50% 3.84 1.5 C-7.5 0 0 10 0
3+390 10.00 3462.623 3461.782 0.84 50% 50% 5.21 1.5 C-7.5 0 0 10 0
3+400 10.00 3456.882 3456.090 0.79 50% 50% 5.79 1.5 C-7.5 0 0 10 0
3+410 10.00 3450.629 3449.874 0.76 50% 50% 5.58 1.5 C-7.5 0 0 10 0
3+420 10.00 3444.434 3443.658 0.78 50% 50% 6.37 1.5 C-7.5 0 0 10 0
3+430 10.00 3443.875 3443.146 0.73 50% 50% 6.16 1.5 C-7.5 0 0 10 0
3+440 10.00 3443.534 3442.705 0.83 50% 50% 5.53 1.5 C-7.5 0 0 10 0 VAL AIRE
3+450 10.00 3436.532 3435.621 0.91 50% 50% 6.05 1.5 C-7.5 0 0 10 0
3+460 10.00 3431.289 3430.573 0.72 50% 50% 5.84 1.5 C-7.5 0 0 10 0 VAL PUR
3+470 10.00 3433.566 3432.641 0.92 50% 50% 7.05 1.5 C-7.5 0 0 10 0
3+480 10.00 3427.442 3426.482 0.96 50% 50% 9.11 1.5 C-7.5 0 0 10 0
3427.442 3426.482 0.96 CR-6
3+490 10.00 3419.310 3418.522 0.79 50% 50% 7.16 1.5 C-7.5 0 0 10 0
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10

3+500 10.00 3413.284 3412.495 0.79 50% 50% 5.00 1.5 C-7.5 0 0 10 0
3+510 10.00 3407.701 3406.977 0.72 50% 50% 5.32 1.5 C-7.5 0 0 10 0
3+520 10.00 3404.949 3404.236 0.71 50% 50% 5.53 1.5 C-7.5 0 0 10 0
3+530 10.00 3402.112 3401.360 0.75 50% 50% 5.63 1.5 C-7.5 0 0 10 0
3+540 10.00 3398.211 3397.459 0.75 50% 50% 5.89 1.5 C-7.5 0 0 10 0
3+550 10.00 3395.338 3394.633 0.71 50% 50% 5.37 1.5 C-7.5 0 0 10 0
3+560 10.00 3395.335 3394.695 0.64 50% 50% 4.47 1.5 C-7.5 0 0 10 0
3+570 10.00 3395.331 3394.756 0.58 50% 50% 3.95 1.5 C-7.5 0 0 10 0
3+580 10.00 3395.368 3394.818 0.55 50% 50% 3.58 1.5 C-7.5 0 0 10 0
3+590 10.00 3395.006 3394.215 0.79 50% 50% 4.63 1.5 C-7.5 0 0 10 0
3+600 10.00 3393.165 3392.404 0.76 50% 50% 5.63 1.5 C-7.5 0 0 10 0
3+610 10.00 3391.323 3390.594 0.73 35% 65% 5.32 1.5 C-7.5 0 0 10 0
3+620 10.00 3390.273 3389.581 0.69 35% 65% 5.00 1.5 C-7.5 0 0 10 0
3+630 10.00 3393.800 3393.081 0.72 35% 65% 4.74 1.5 C-7.5 0 0 10 0
3+640 10.00 3397.339 3396.622 0.72 35% 65% 4.74 1.5 C-7.5 0 0 10 0
3+650 10.00 3397.530 3396.745 0.79 35% 65% 5.21 1.5 C-7.5 0 0 10 0
3+660 10.00 3397.608 3396.869 0.74 35% 65% 5.32 1.5 C-7.5 0 0 10 0
3+670 10.00 3397.638 3396.992 0.65 35% 65% 4.58 1.5 C-7.5 0 0 10 0
3+680 10.00 3397.600 3396.911 0.69 35% 65% 4.42 1.5 C-7.5 0 0 10 0
3+690 10.00 3397.459 3396.781 0.68 35% 65% 4.68 1.5 C-7.5 0 0 10 0
3+700 10.00 3399.743 3399.030 0.71 35% 65% 4.84 1.5 C-7.5 0 0 10 0
3+710 10.00 3403.111 3402.401 0.71 20% 80% 5.11 1.5 C-7.5 0 0 10 0
3+720 10.00 3404.817 3404.107 0.71 20% 80% 5.16 1.5 C-7.5 0 0 10 0
3+730 10.00 3406.522 3405.812 0.71 20% 80% 5.16 1.5 C-7.5 0 0 10 0
3+740 10.00 3409.003 3408.281 0.72 20% 80% 5.21 1.5 C-7.5 0 0 10 0
3+750 10.00 3409.309 3408.612 0.70 20% 80% 5.89 1.5 C-7.5 0 0 10 0
3+760 10.00 3409.639 3408.940 0.70 20% 80% 6.58 1.5 C-7.5 0 0 10 0
3+770 10.00 3410.540 3409.815 0.72 20% 80% 6.47 1.5 C-7.5 0 0 10 0
3+780 10.00 3412.394 3411.671 0.72 20% 80% 6.00 1.5 C-7.5 0 0 10 0
3+790 10.00 3412.649 3411.925 0.72 20% 80% 5.47 1.5 C-7.5 0 0 10 0
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10

3+800 10.00 3412.566 3411.861 0.70 20% 80% 5.21 1.5 C-7.5 0 0 10 0
3+810 10.00 3411.615 3410.900 0.71 20% 80% 5.21 1.5 C-7.5 0 0 10 0
3+820 10.00 3409.811 3409.082 0.73 20% 80% 5.26 1.5 C-7.5 0 0 10 0
3+830 10.00 3407.749 3407.036 0.71 20% 80% 5.26 1.5 C-7.5 0 0 10 0
3+840 10.00 3407.737 3406.986 0.75 20% 80% 5.47 1.5 C-7.5 0 0 10 0
3+850 10.00 3407.610 3406.901 0.71 20% 80% 5.84 1.5 C-7.5 0 0 10 0
3+860 10.00 3406.828 3406.149 0.68 20% 80% 5.21 1.5 C-7.5 0 0 10 0
3+870 10.00 3406.588 3405.887 0.70 20% 80% 4.79 1.5 C-7.5 0 0 10 0
3+880 10.00 3406.266 3405.562 0.70 20% 80% 5.16 1.5 C-7.5 0 0 10 0
3+890 10.00 3405.566 3404.890 0.68 20% 80% 5.00 1.5 C-7.5 0 0 10 0
3+900 10.00 3405.560 3404.857 0.70 20% 80% 5.05 1.5 C-7.5 0 0 10 0
3+910 10.00 3404.278 3403.559 0.72 20% 80% 5.79 1.5 C-7.5 0 0 10 0
3+920 10.00 3402.459 3401.756 0.70 20% 80% 5.58 1.5 C-7.5 0 0 10 0
3+930 10.00 3401.577 3400.874 0.70 20% 80% 4.84 1.5 C-7.5 0 0 10 0
3+940 10.00 3400.695 3399.992 0.70 20% 80% 4.84 1.5 C-7.5 0 0 10 0
3+950 10.00 3399.762 3399.041 0.72 20% 80% 4.89 1.5 C-7.5 0 0 10 0
3+960 10.00 3399.419 3398.705 0.71 20% 80% 4.68 1.5 C-7.5 0 0 10 0
3+970 10.00 3397.409 3396.783 0.63 20% 80% 4.21 1.5 C-7.5 0 0 10 0
3+980 10.00 3395.500 3394.861 0.64 20% 80% 4.00 1.5 C-7.5 0 0 10 0
3+990 10.00 3393.592 3392.939 0.65 20% 80% 4.05 1.5 C-7.5 0 0 10 0
4+000 10.00 3391.572 3390.869 0.70 20% 80% 4.47 1.5 C-7.5 0 0 10 0
4+010 10.00 3389.060 3388.361 0.70 20% 80% 4.79 1.5 C-7.5 0 0 10 0
4+020 10.00 3386.779 3386.072 0.71 20% 80% 4.79 1.5 C-7.5 0 0 10 0
4+030 10.00 3385.131 3384.363 0.77 20% 80% 5.00 1.5 C-7.5 0 0 10 0
4+040 10.00 3380.795 3379.900 0.89 20% 80% 5.74 1.5 C-7.5 0 0 10 0
4+050 10.00 3376.407 3375.664 0.74 20% 80% 5.63 1.5 C-7.5 0 0 10 0
4+060 10.00 3372.844 3372.100 0.74 20% 80% 4.95 1.5 C-10 0 0 0 10
4+070 10.00 3372.733 3372.038 0.70 20% 80% 4.68 1.5 C-10 0 0 0 10 VAL PUR
4+080 10.00 3373.524 3372.823 0.70 20% 80% 4.42 1.5 C-10 0 0 0 10
4+086 6.29 3373.509 3372.817 0.69 20% 80% 4.42 1.5 C-10 0 0 0 6.291
PROG. DIST. COTA COTA ALTURA TIPO DE TERRENO TIPO DE TERRENO CLASE TIPOS DE TUBERÍA
CONGLO SEMI D
HORIZ. TERRENO TUBERIA DE ZANJA SUELTO NORMAL ROCA Ø 2" (50mm) Ø 1 1/2" (35mm)
MERADO ROCA OBS.
KM TUBERIA
m msnm msnm m % % m m m Pulg C-7.5 C-10 C-7.5 C-10

134.26 1255.82 732.37 1560.00 690.00 1800.00 36.29


HOJA DE METRADO CAMARAS DE PURGA, AIRE, ROMPE PRESION Y REPARTIDORA
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

LONG. MEDIDAS
Item DESCRIPCION Und Sub Total Total
Nro Veces Largo Alto Ancho Parcial

05.00.00 CAMARAS DE PURGA, AIRE Y ROMPE PRESION


05.01.00 OBRAS PRELIMINARES
05.01.01 LIMPIEZA DE TERRENO MANUAL M2 25 1.00 1.00 25.00 25.00
05.01.02 TRAZO Y REPLANTEO INICIAL M2 25 1.00 1.00 25.00 25.00
05.01.03 TRAZO Y REPLANTEO FINAL M2 25 1.00 1.00 25.00 25.00
05.02.00 OBRAS DE ARTE
05.02.01 CAMARA P/ROMPE PRESION T.N. 0.80x0.80m H=0.80m, e=0.15m UND 6 6.00 6.00
05.02.02 CAMARA P/VALV.PURGA T.N. 0.80X0.80m H=0.80m (TUB. 35mm - 1 1/2") UND 3 3.00 3.00
05.02.03 CAMARA P/VALV.PURGA T.N. 0.80X0.80m H=0.80m (TUB. 50mm - 2") UND 5 5.00 5.00
05.02.04 CAMARA P/VALV. AIRE 15MM TN 0.80x0.80m H=1.0m (TUB 35mm - 1 1/2") UND 3 3.00 3.00
05.02.05 CAMARA P/VALV. AIRE 15MM TN 0.80x0.80m H=1.0m (TUB 50mm - 2") UND 7 7.00 7.00
05.02.06 CAMARA P/DISTRIBUCION TN 0.80x0.80m H=1.0m (TUB 35mm - 1 1/2") UND 1 1.00 1.00
05.03.00 TUBERIA DE DESCARGA Y REBOSE
05.03.01 EXCAV. MANUAL P/AGUA T.SEMI ROCA P/TUB. 1/2"-2" H=0.80M ML 96.00
C.ROMPEPRESION 6 6.00 36.00
RESERVORIO 1 50.00 50.00
C.DE REUNION 1 10.00 10.00

05.03.02 REFINE Y NIVELACIÓN FONDO ZANJA P/TUB. HASTA 50MM ML 96.00


C.ROMPEPRESION 6 6.00 36.00
RESERVORIO 1 50.00 50.00
C.DE REUNION 1 10.00 10.00

05.03.03 CAMA DE ARENA MANUAL E=0.10 M ZANJA P/TUB HASTA 50MM ML 96.00
C.ROMPEPRESION 6 6.00 36.00
RESERVORIO 1 50.00 50.00
C.DE REUNION 1 10.00 10.00

05.03.04 RELLENO ZANJA MAT.SELECC.COMPACT. P/TUB 1/2"-2" H=0.80M ML 96.00


C.ROMPEPRESION 6 6.00 36.00
RESERVORIO 1 50.00 50.00
C.DE REUNION 1 10.00 10.00

05.03.05 ESPARCIDO DE MATERIAL SOBRANTE P/TUB.HASTA 2" (50MM) ML 96.00


C.ROMPEPRESION 6 6.00 36.00
RESERVORIO 1 50.00 50.00
C.DE REUNION 1 10.00 10.00

05.03.06 TUBERIA P.V.C. AGUA A-7.5 SP 2" SUMINISTRO (50MM) ML 96.00


C.ROMPEPRESION 6 6.00 36.00
RESERVORIO 1 50.00 50.00
C.DE REUNION 1 10.00 10.00

05.03.07 INST. TUBERIA P.V.C. P/AGUA 50MM SP INC. PRUEBA ML 96.00


C.ROMPEPRESION 6 6.00 36.00
RESERVORIO 1 50.00 50.00
C.DE REUNION 1 10.00 10.00

05.03.08 PRUEBA HIDR.+DESINFEC.DE TUB. ZANJA TAPADA 2" (50MM) ML 96.00


C.ROMPEPRESION 6 6.00 36.00
RESERVORIO 1 50.00 50.00
C.DE REUNION 1 10.00 10.00

05.03.09 ESTRUCTURA DE DESCARGA CAMARA DE PURGA INC/EMBOQUILLADO UND 8.00


CAMARA DE PURGA 8 8.00
CUADROS OBRAS DE ARTE DE LINEA DE CONDUCCION

OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

OBS. PROG. COTA COTA ALTURA TIPO DE TERRENO


DE CONGLO D CLASE DIMENSIONES EFECTIVAS DE LA ESTRUCTURA
EXCAV. SUELTO
KM TERRENO TUBERIA MERADO

msnm msnm m % % Pulg TUBERIA Largo (m) Ancho (m) Altura (m) Espesor (m)

CAMARAS ROMPEPRESION

CR-01 2+250 3672.98 3671.93 1.05 50% 50% 2 C-7.5 1.10 1.10 1.20 0.15
CR-02 2+750 3622.56 3621.88 0.68 50% 50% 1.5 C-7.5 1.10 1.10 1.20 0.15
CR-03 2+970 3574.35 3573.62 0.74 50% 50% 1.5 C-7.5 1.10 1.10 1.20 0.15
CR-04 3+140 3524.73 3524.03 0.70 50% 50% 1.5 C-7.5 1.10 1.10 1.20 0.15
CR-05 3+320 3476.97 3476.18 0.79 50% 50% 1.5 C-7.5 1.10 1.10 1.20 0.15
CR-06 3+480 3427.44 3426.48 0.96 50% 50% 1.5 C-7.5 1.10 1.10 1.20 0.15
CAMARAS PARA VALVULA DE AIRE
V. Aire 01 0+088 3707.80 3707.10 0.70 50% 50% 2 C-7.5 1.10 1.10 1.30 0.15
V. Aire 02 0+341 3685.35 3684.65 0.70 50% 50% 2 C-7.5 1.10 1.10 1.30 0.15
V. Aire 03 0+671 3659.54 3658.83 0.71 20% 80% 2 C-10 1.10 1.10 1.30 0.15
V. Aire 04 0+939 3677.14 3676.44 0.70 20% 80% 2 C-10 1.10 1.10 1.30 0.15
V. Aire 05 1+252 3683.72 3683.01 0.71 20% 80% 2 C-7.5 1.10 1.10 1.30 0.15
V. Aire 06 1+674 3707.65 3706.94 0.71 30% 70% 2 C-7.5 1.10 1.10 1.30 0.15
V. Aire 07 1+999 3704.92 3704.21 0.71 50% 50% 2 C-7.5 1.10 1.10 1.30 0.15
V. Aire 08 2+650 3640.33 3639.61 0.72 50% 50% 1.5 C-7.5 1.10 1.10 1.30 0.15
V. Aire 09 3+437 3445.58 3444.87 0.71 50% 50% 1.5 C-7.5 1.10 1.10 1.30 0.15
V. Aire 10 3+785 3412.66 3411.96 0.70 50% 50% 1.5 C-7.5 1.10 1.10 1.30 0.15
CAMARAS PARA VALVULA DE PURGA
V. Purga 01 0+141 3690.44 3688.76 1.68 50% 50% 2 C-7.5 1.10 1.10 1.10 0.15
V. Purga 02 0+628 3646.37 3645.16 1.21 20% 80% 2 C-10 1.10 1.10 1.10 0.15
V. Purga 03 0+772 3626.96 3623.62 3.34 20% 80% 2 C-10 1.10 1.10 1.10 0.15
V. Purga 04 1+690 3696.48 3695.64 0.84 30% 70% 2 C-7.5 1.10 1.10 1.10 0.15
V. Purga 05 1+952 3692.09 3690.25 1.84 50% 50% 2 C-7.5 1.10 1.10 1.10 0.15
V. Purga 06 2+609 3631.21 3630.39 0.82 50% 50% 1.5 C-7.5 1.10 1.10 1.10 0.15
V. Purga 07 3+459 3441.17 3440.46 0.71 50% 50% 1.5 C-7.5 1.10 1.10 1.10 0.15
V. Purga 08 4+064 3372.24 3371.54 0.70 20% 80% 1.5 C-10 1.10 1.10 1.10 0.15
CAMARAS PARA DISTRIBUCION
CD - 01 (Aducc) 0+246 3332.82 3332.12 0.70 80% 20% 1.5 C-7.5 1.10 1.10 1.10 0.15
HOJA DE METRADO DE CAMARA ROMPEPRESION, DE PURGA Y DE AIRE
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

Item DESCRIPCION Und LONG. MEDIDAS Sub Total


Nro Veces Largo Alto Ancho Parcial Total
A CAMARA ROMPE PRESION
a MOVIENTO DE TIERRAS
i EXCAVACION EN MAT. SUELTO M3 1 1.10 1.05 1.10 1.27 1.27 1.27

ii REFINE, NIVELACION Y COMPAC. M2 1 1.10 1.10 1.21 1.21 1.21

iii RELLENO CON MATERIAL PROPIO SELECCIONADO M3 1.10 0.80 1.10 0.97 0.97 0.97
coef esponj.
ESPARCIDO DE MAT. EXCEDENTE HASTA D. PROM.=
iv M3 1 V= 0.30 0.39 0.39
30.00 m.

b CONCRETO SIMPLE
i SOLADO Cº SIMPLE E=4" (CONCRETO 100 KG/CM2) M2 1 1.10 0.10 1.10 0.12 0.12

c CONCRETO ARMADO M3
i CONCRETO ARMADO 210 KG/CM2 0.89
PISO 1 1.10 0.15 1.10 0.18 0.89
MURO 4 1.10 0.80 0.15 0.53
LOSA 1 1.10 0.15 1.10 0.18

ii ENCOFRADO Y DESENCOFRADO M2 9.66


MURO 8 1.10 0.95 8.36 9.66
LOSA 1 0.80 0.80 0.64
LOSA 4 1.10 0.15 0.66

iii ACERO KG VER HOJA DE METRADOS ACERO 71.87 71.87

d VALVULAS Y ACCESORIOS - CAMARA ROMPE PRESION


i TUBERIA DE REBOSE DN 50 PVC ML 1 0.60 0.60 0.60
ii TEE DN 50X50 PVC UND 1 1.00 1.00 1.00
iii CODO 50X90 PVC UND 1 1.00 1.00 1.00
iv TAPON PVC DN 50 UND 1 1.00 1.00 1.00
TAPA DE INSPECCION DE 0,60X0,60 INC. PINTADO,
v UND 1 2.00 2.00 2.00 2.00
BISAGRA Y CANDADO

B CAMARA DE PURGA
a MOVIENTO DE TIERRAS
i EXCAVACION EN TERRENO NORMAL M3 1.15
CAMARA DE PURGA 1 1.10 0.95 1.10 1.15 1.15
1 0.30 0.35 0.30 0.03
1 0.60 0.15 0.60 0.05

ii REFINE, NIVELACION Y COMPAC. M2 1.66


CAMARA DE PURGA 1 1.10 1.10 1.21 1.66
1 0.60 0.60 0.36
1 0.30 0.30 0.09

iii RELLENO CON MATERIAL PROPIO SELECCIONADO M3 1.10 0.80 1.10 0.97 0.97 0.97
coef. Esponj.
ESPARCIDO DE MAT. EXCEDENTE HASTA D. PROM.=
iv M3 1 V= 0.18 1.30 0.23 0.23
30.00 m.
HOJA DE METRADO DE CAMARA ROMPEPRESION, DE PURGA Y DE AIRE
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

Item DESCRIPCION Und LONG. MEDIDAS Sub Total


Nro Veces Largo Alto Ancho Parcial Total
A CAMARA ROMPE PRESION
b CONCRETO SIMPLE
SOLADO Cº SIMPLE E=4" (CONCRETO F'C=100 KG/CM2) M2 1 1.10 0.10 1.10 0.12 0.12

c CONCRETO ARMADO M3
i CONCRETO ARMADO 210 KG/CM2 0.89
PISO 1 1.10 0.15 1.10 0.18 0.89
MURO 4 1.10 0.80 0.15 0.53
LOSA 1 1.10 0.15 1.10 0.18

ii ENCOFRADO Y DESENCOFRADO M2 9.88


MURO 8 1.10 0.95 8.36
LOSA 1 0.80 0.80 0.64
LOSA 4 1.10 0.20 0.88 9.88

iii ACERO KG VER HOJA DE METRADOS ACERO 0.00 72.94

d VALVULAS Y ACCESORIOS - CAMARA DE PURGA


i GRAVA DE 1/2" M3 1 0.30 0.40 0.30 0.04
ii TUBERIA FºGº DN 35 ML 1 1.00 1.00
iii UNION UNIVERSAL DN 35 UND 2 2.00 2.00
iv CODO PVC DN 35 x 45º UND 1 1.00 1.00
v CODO PVC DN 35 x 90º UND 3 3.00 3.00
vi TEE PVC DN 35 x DN 35 C-7.5 UND 1 1.00 1.00
vii TRANSICION PVC A FºGº DN 35 C-7.5 UND 1 1.00 1.00
viii NIPLE PVC DN 35 C-7.5 UND 3 3.00 3.00
ix NIPLE FºGº DN 35mm UND 5 5.00 5.00
x VALVULA COMPUERTA BRONCE DN 35mm UND 1 1.00 1.00
TAPA DE INSPECCION DE 0,60X0,60 INC. PINTADO,
xi UND 1 1.00 1.00
BISAGRA Y CANDADO

C CAMARA DE VALVULA DE AIRE


a MOVIENTO DE TIERRAS
i EXCAVACION EN TERRENO NORMAL M3 1.39
CAMARA DE AIRE 1 1.10 1.15 1.10 1.39 1.39
1 0.30 0.35 0.30 0.03
1 0.60 0.15 0.60 0.05

ii REFINE, NIVELACION Y COMPAC. M2 1.66


CAMARA DE AIRE 1 1.10 1.10 1.21 1.66
1 0.60 0.60 0.36
1 0.30 0.30 0.09

iii RELLENO CON MATERIAL PROPIO SELECCIONADO M3 1.10 1.00 1.10 1.21 1.21 1.21

ESPARCIDO DE MAT. EXCEDENTE HASTA D. PROM.=


iv M3 coef.esponj
30.00 m.

Coef. De expojamiento 1.3 1 V= 0.18 1.30 0.23 0.23

b CONCRETO SIMPLE
i SOLADO Cº SIMPLE E=4" (CONCRETO F'C=100 KG/CM2) M2 1 1.10 0.10 1.10 0.12 0.12
HOJA DE METRADO DE CAMARA ROMPEPRESION, DE PURGA Y DE AIRE
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

Item DESCRIPCION Und LONG. MEDIDAS Sub Total


Nro Veces Largo Alto Ancho Parcial Total
A CAMARA ROMPE PRESION
c CONCRETO ARMADO M3
i CONCRETO ARMADO 210 KG/CM2 1.02
PISO 1 1.10 0.15 1.10 0.18
MURO 4 1.10 1.00 0.15 0.66
LOSA 1 1.10 0.15 1.10 0.18 1.02

ii ENCOFRADO Y DESENCOFRADO M2 11.42


MURO 8 1.10 1.15 10.12 11.42
LOSA 1 0.80 0.80 0.64
FRISO 4 1.10 0.15 0.66

03.06.00 ACERO KG VER HOJA DE METRADOS ACERO 0.00 72.94

d VALVULAS Y ACCESORIOS - CAMARA DE PURGA


i GRAVA DE 1/2" M3 1 0.30 0.40 0.30 0.04
ii TUBERIA FºGº DN 35 ML 1 1.00 1.00
iii TUBERIA FºGº DN 15 ML 1 0.15 0.15
iv TEE FºGº DN 35 x DN 35 C-7.5 UND 1 1.00 1.00
v UNION UNIVERSAL FºGº DN 35 UND 2 2.00 2.00
vi REDUCCION FºGº DN 35 A 15mm C-7.5 UND 1 1.00 1.00
vii TRANSICION PVC A FºGº DN 35 C-7.5 UND 2 2.00 2.00
viii VALVULA COMPUERTA BRONCE DN 35 UND 1 1.00 1.00
ix VALVULA DE AIRE DN 15MM UND 1 1.00 1.00
x NIPLE PVC DN 35 C-7.5 UND 8 8.00 8.00
TAPA DE INSPECCION DE 0,60X0,60 INC. PINTADO,
xi UND 1 1.00 1.00
BISAGRA Y CANDADO
HOJA DE METRADO DE ACERO
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

METRADO DE ACERO
Ø -------> 1/4 '' 3/8 '' 1/2 '' 5/8 '' 3/4 '' 1 '' Sub
PARTIDA DESCRIPCION Und Total
kg/m -------> 0.25 0.58 1.02 1.60 2.26 4.04 Total
0.32 0.58 1.02 1.60 2.34 4.10
ACERO CORTADO Y TRABAJADO Fy=4200 kg/cm2
CAMARA ROMPEPRESION
ACERO EN MURO KG
HORIZONTAL 1.40 4.00 8.00 3/8 '' 1.40 0.58 25.98

VERTICAL 1.60 4.00 7.00 3/8 '' 1.60 0.58 25.98

51.96

ACERO PISO KG

DIRECCION X-X 1.00 1.00 7.00 3/8 '' 1.00 0.58 4.06

DIRECCION Y-Y 1.00 1.00 7.00 3/8 '' 1.00 0.58 4.06

8.12

ACERO EN TECHO KG

DIRECCION X-X 1.00 1.00 7.00 3/8 '' 1.00 0.58 4.06

DIRECCION Y-Y 1.00 1.00 7.00 3/8 '' 1.00 0.58 4.06

REFUERZO EN TAPAS 0.90 4.00 1.00 1/2 '' 0.90 1.02 3.67

11.79 71.87

CAMARA DE PURGA O CAMARA DE AIRE


ACERO EN MURO KG
HORIZONTAL 1.50 4.00 8.00 3/8 '' 1.50 0.58 27.84

VERTICAL 1.45 4.00 7.00 3/8 '' 1.45 0.58 23.55

51.39

ACERO PISO KG

DIRECCION X-X 1.10 1.00 7.00 3/8 '' 1.10 0.58 4.47

DIRECCION Y-Y 1.10 1.00 7.00 3/8 '' 1.10 0.58 4.47

8.94

ACERO EN TECHO KG

DIRECCION X-X 1.10 1.00 7.00 3/8 '' 1.10 0.58 4.47

DIRECCION Y-Y 1.10 1.00 7.00 3/8 '' 1.10 0.58 4.47

REFUERZO EN TAPAS 0.90 4.00 1.00 1/2 '' 0.90 1.02 3.67

12.61 72.94
HOJA DE METRADO DE RESERVORIO DE ALMACENAMIENTO
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

Und LONG. MEDIDAS Sub Total


Item DESCRIPCION
Nro Veces Largo Alto Ancho Parcial Total

06.00.00 RESERVORIO DE ALMACENAMIENTO


06.01.00 OBRAS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO MANUAL M2 19.17
RESERVORIO 1 4.80 3.30 15.84
CAMARA DE VALVULAS 1 1.75 1.90 3.33

06.01.02 TRAZO Y REPLANTEO INICIAL M2 Idem 06.01.01 19.17 19.17


06.01.03 TRAZO Y REPLANTEO FINAL M2 Idem 06.01.01 19.17 19.17

06.02.00 MOVIENTO DE TIERRAS


06.02.01 EXCAVACION EN TERRENO TIPO ROCA M3 58.78
RESERVORIO 1 5.20 1.95 5.20 52.73
CAMARA DE VALVULAS 1 1.95 1.35 2.30 6.05

06.02.02 REFINE Y NIVELACION EN TERRENO NORMAL M2 23.73


RESERVORIO 1 5.20 3.70 19.24
CAMARA DE VALVULAS 1 1.95 2.30 4.49

RELLENO CON MATERIAL DE PRESTAMO


06.02.03 M3 9.57
SELECCIONADO
RESERVORIO 1 12.45 1.20 0.50 7.47
CAMARA DE VALVULAS 1 5.25 0.80 0.50 2.10

ESPARCIDO DE MAT. EXCEDENTE HASTA D.


06.02.04 M3
PROM.= 30.00 m.
Coef. De expojamiento 1.3 1 V= 49.21 63.97

06.03.00 CONCRETO SIMPLE


06.03.01 Cº SIMPLE E=4" F'C=100 KG/CM2 PARA SOLADOS M3 2.37 2.37
RESERVORIO 1 5.20 0.10 3.70 1.92
CAMARA DE VALVULAS 1 1.95 0.10 2.30 0.45

06.04.00 CONCRETO ARMADO


06.04.01 LOSA DE FONDO (PISO)
06.04.01.1 CONCRETO ARMADO 210 KG/CM2 M3 6.12
RESERVORIO 1 5.40 0.25 3.70 5.00
CAMARA DE VALVULAS 1 1.95 0.25 2.30 1.12

06.04.01.2 ENCOFRADO Y DESENCOFRADO M2 3.21


RESERVORIO 1 8.50 0.25 2.13
CAMARA DE VALVULAS 2 2.15 0.25 1.08

06.04.01.3 ACERO FY=4200 KG/CM2 KG VER HOJA DE METRADOS ACERO 0.00 203.22

06.04.02 MUROS
06.04.02.1 CONCRETO ARMADO 210 KG/CM2 M3 4.51
RESERVORIO 2 4.80 1.60 0.15 2.30
RESERVORIO 2 3.00 1.60 0.15 1.44
HOJA DE METRADO DE RESERVORIO DE ALMACENAMIENTO
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

Und LONG. MEDIDAS Sub Total


Item DESCRIPCION
Nro Veces Largo Alto Ancho Parcial Total

CAMARA DE VALVULAS 2 1.75 1.00 0.15 0.53


CAMARA DE VALVULAS 1 1.60 1.00 0.15 0.24

06.04.02.2 ENCOFRADO Y DESENCOFRADO M2 75.02


RESERVORIO 4 4.65 1.95 36.27
RESERVORIO 4 3.15 1.95 24.57
CAMARA DE VALVULAS 4 1.75 1.35 9.45
CAMARA DE VALVULAS 2 1.75 1.35 4.73

06.04.02.3 ACERO FY=4200 KG/CM2 KG VER HOJA DE METRADOS ACERO 0.00 430.83

06.04.03 TECHOS
06.04.03.1 CONCRETO ARMADO 210 KG/CM2 M3 2.37
RESERVORIO 1 5.20 0.10 3.70 1.92
CAMARA DE VALVULAS 1 1.95 0.10 2.30 0.45

06.04.03.2 ENCOFRADO Y DESENCOFRADO M2 25.65


RESERVORIO 1 4.50 3.00 13.50
CAMARA DE VALVULAS 1 1.60 1.60 2.56
ALERO DE RESERVORIO 1 17.80 0.20 3.56
ALERO C. DE VALVULAS 2 1.75 0.20 0.70
FRISO DE RESERVORIO 1 17.80 0.25 4.45
FRISO C. DE VALVULAS 2 1.75 0.25 0.88

06.04.03.3 ACERO KG VER HOJA DE METRADOS ACERO 205.60

06.05.00 REVOQUES Y ENLUCIDOS


06.05.01 TARRAJEO CON IMPERM. LOSA DE FONDO M2 16.06
RESERVORIO 1 4.50 3.00 13.50
CAMARA DE VALVULAS 1 1.60 1.60 2.56

06.05.02 TARRAJEO CON IMPERM. MURO INTERIOR M2 37.52


RESERVORIO 2 4.65 1.95 0.00 18.14
RESERVORIO 2 3.15 1.95 0.00 12.29
CAMARA DE VALVULAS 2 1.75 1.35 0.00 4.73
CAMARA DE VALVULAS 1 1.75 1.35 0.00 2.36

06.05.03 CIELO RASOS INCL. VIGAS 16.06


RESERVORIO 1 4.50 0.00 3.00 13.50
CAMARA DE VALVULAS 1 1.60 0.00 1.60 2.56

06.06.00 ACCESORIOS
06.06.01 TEE PVC DN 50X50 (2") PARA AGUA 1 1.00 1.00
06.06.02 CODO PVC SP DE 2" X 90° PARA AGUA 5 5.00 5.00
06.06.03 VALVULA COMPUERTA DE BRONCE 2" 4 4.00 4.00
06.06.04 INST. VALVULAS COMPUERTA DE BRONCE HASTA 50M 4 4.00 4.00
06.06.05 UNION UNIVERSAL PVC 2" PARA AGUA 8 8.00 8.00
06.06.06 CANASTILLA DE PVC DN 50 MM 1 1.00 1.00
HOJA DE METRADO DE RESERVORIO DE ALMACENAMIENTO
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

Und LONG. MEDIDAS Sub Total


Item DESCRIPCION
Nro Veces Largo Alto Ancho Parcial Total

06.06.07 INST CANASTILLA DE PVC DN 50 MM 1 1.00 1.00


06.07.00 VARIOS
TAPA DE INSPECCION DE 0,60X0,60 INC.
06.07.01 UND 2.00 2.00
BISAGRA Y CANDADO
06.07.02 TUBO DE VENTILACION FºGº DN 50 UND 2.00 2.00
06.07.03 ESCALINES FºFº F=3/4" ML 2.00 5.00 10.00 10.00
06.07.04 ABRAZADERA DE ANCLAJE P/TUB. 50MM UND 2.00 2.00
HOJA DE METRADO DE ACERO
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

METRADO DE ACERO
Ø -------> 1/4 '' 3/8 '' 1/2 '' 5/8 '' 3/4 '' 1 '' Sub
PARTIDA DESCRIPCION Und Total
kg/m -------> 0.25 0.58 1.02 1.60 2.26 4.04 Total
0.320 0.580 1.020 1.600 2.340 4.100
RESERVORIO DE ALMACENAMIENTO
06.04.01.3 ACERO CORTADO Y TRABAJADO Fy=4200 kg/cm2 203.22

RESERVORIO DE ALMACENAMIENTO

ACERO PISO KG 173.82

DIRECCION X-X 5.55 1.00 27.00 3/8 '' 5.55 0.58 86.91

DIRECCION Y-Y 4.05 1.00 37.00 3/8 '' 4.05 0.58 86.91

CAMARA DE VALVULAS

ACERO PISO KG 29.40

DIRECCION X-X 1.95 1.00 13.00 3/8 '' 1.95 0.58 14.70

DIRECCION Y-Y 1.95 1.00 13.00 3/8 '' 1.95 0.58 14.70

06.04.02.3 ACERO CORTADO Y TRABAJADO Fy=4200 kg/cm2 430.83

RESERVORIO DE ALMACENAMIENTO

ACERO EN MURO KG

Direccion Y-Y 138.48

HORIZONTAL 3.75 2.00 16.00 3/8 '' 3.75 0.58 69.60

VERTICAL 2.38 2.00 25.00 3/8 '' 2.38 0.58 68.88

Direccion X-X 193.87

HORIZONTAL 5.25 2.00 16.00 3/8 '' 5.25 0.58 97.44

VERTICAL 2.38 2.00 35.00 3/8 '' 2.38 0.58 96.43

CAMARA DE VALVULAS

ACERO EN MURO KG

Direccion Y-Y 32.83

HORIZONTAL 2.35 1.00 12.00 3/8 '' 2.35 0.58 16.36

VERTICAL 1.78 1.00 16.00 3/8 '' 1.78 0.58 16.47

Direccion X-X 65.65

HORIZONTAL 2.35 2.00 12.00 3/8 '' 2.35 0.58 32.71

VERTICAL 1.78 2.00 16.00 3/8 '' 1.78 0.58 32.94

06.04.03.3 ACERO CORTADO Y TRABAJADO Fy=4200 kg/cm2 205.60

RESERVORIO DE ALMACENAMIENTO

ACERO EN TECHO KG 176.75

DIRECCION X-X 5.45 1.00 27.00 3/8 '' 5.45 0.58 85.35

DIRECCION Y-Y 4.05 1.00 37.00 3/8 '' 4.05 0.58 86.91

REFUERZO EN TAPAS 1.00 4.00 1/2 '' 1.10 1.02 4.49

CAMARA DE VALVULAS

ACERO EN TECHO KG 28.85

DIRECCION X-X 1.75 1.00 12.00 3/8 '' 1.75 0.58 12.18

DIRECCION Y-Y 1.75 1.00 12.00 3/8 '' 1.75 0.58 12.18

REFUERZO EN TAPAS 1.00 4.00 1/2 '' 1.10 1.02 4.49


HOJA DE METRADO DE LINEA DE ADUCCION
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

LONG. MEDIDAS Sub Total


Item DESCRIPCION Und
Nro Veces Largo Alto Ancho Parcial Total

07.00.00 LINEA DE ADUCCION


07.01.00 OBRAS PRELIMINARES
07.01.01 LIMPIEZA DE TERRENO MANUAL M2 368.25
DE RESERVORIO A RED DE AGUA 1 245.50 1.50 368.25

07.01.02 TRAZO Y REPLANTEO INICIAL M2 Idem 07.01.01 368.25 368.25


07.01.03 TRAZO Y REPLANTEO FINAL M2 Idem 07.01.01 368.25 368.25

07.02.00 MOVIENTO DE TIERRAS


07.02.01 EXCAVACION EN TERRENO TIPO ROCA ML
DE RESERVORIO A RED DE AGUA 1 245.50 245.50 245.50

07.02.02 REFINE Y NIVELACION FONDO ZANJA P/TUB. HAS ML


DE RESERVORIO A RED DE AGUA 1 245.50 245.50 245.50

07.02.03 CAMA DE ARENA MANUAL E=0.10M ZANJA P/TUB ML


DE RESERVORIO A RED DE AGUA 1 245.50 245.50 245.50

07.02.04 RELLENO ZANJA MAT.SELECC.COMPACT. P/TUB. ML


DE RESERVORIO A RED DE AGUA 1 245.50 245.50 245.50

07.02.05 ESPARCIDO DE MATERIAL SOBRANTE P/TUB HASTAML


DE RESERVORIO A RED DE AGUA 1 245.50 245.50 245.50

07.03.00 TUBERIA DE DESCARGA


07.03.01 TUBERIA P.V.C. AGUA POTABLE A-7.5 SP 1 1/2" S ML
DE RESERVORIO A RED DE AGUA 1 245.50 245.50 245.50

07.03.02 INST. TUBERIA P.V.C. P/AGUA POTABLE 35MM S.P ML


DE RESERVORIO A RED DE AGUA 1 245.50 245.50 245.50

07.03.03 PRUEBA HIDR.+DESINFEC.DE TUB. ZANJA TAPADA ML


DE RESERVORIO A RED DE AGUA 1 245.50 245.50 245.50

07.04.00 ACCESORIOS

07.04.01 CODO PVC SP DE 1 1/2" X 22.5º PARA AGUA UND


EN LA LINEA 1 1.00 1.00

07.04.02 CODO PVC SP DE 1 1/2" X 45º PARA AGUA UND


EN LA LINEA 3 3.00 3.00

07.04.03 INST. DE ACCESORIOS PVC S.P. 1 1/2" UND


AL FINAL DE RED DE ADUCCION 4 4.00 4.00
HOJA DE METRADO DE RED DE DISTRIBUCION DE AGUA POTABLE
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

LONG. MEDIDAS Sub


Item DESCRIPCION Und
Nro Veces Largo Alto Ancho Parcial Total

08.00.00 RED DE DISTRIBUCION DE AGUA POTABLE


08.01.00 OBRAS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL M2
De Linea de Aduccion a toda la red 1 3,025.51 1.20 3,630.61

08.01.02 TRAZO Y REPLANTEO INICIAL M2 Idem 07.01.01 3,630.61


08.01.03 TRAZO Y REPLANTEO FINAL M2 Idem 07.01.01 3,630.61

08.02.00 MOVIMIENTO DE TIERRA


08.02.01 EXCAV MANUAL P/AGUA T.BOLONERIA P/TUB 1/2"-2" H=0.8M ML 3,025.51 3,025.51
08.02.02 REFINE Y NIVELACION FONDO ZANJA P/TUB. 1/2"-2" CONEX.DOMICIL ML 3,025.51 3,025.51
08.02.03 CAMA DE ARENA MANUAL E=0.10 M ZANJA P/TUB 1/2"-2" CONEX DOM ML 3,025.51 3,025.51
08.02.04 RELLENO ZANJA MAT.SELECC.COMPACT. P/TUB 1/2"-2" H=0.80M ML 3,025.51 3,025.51
08.02.05 ESPARCIDO DE MATERIAL SOBRANTE P/TUB. HASTA 2" (50MM) ML 3,025.51 3,025.51

08.03.00 SUM E INST DE TUBERIA


08.03.01 TUBERIA P.V.C. AGUA POTABLE C-7.5 Ø 1" (25mm) SUMINISTRO ML 2,825.37 2,825.37
08.03.02 TUBERIA P.V.C. AGUA POTABLE C-7.5 Ø1 1/2" (35mm) SUMINISTRO ML 200.14 200.14
08.03.03 INST. TUBERIA PVC P/AGUA 1" (25mm) PRESION ML 2,825.37 2,825.37
08.03.04 INST. TUBERIA PVC P/AGUA 1 1/2" (35mm) PRESION ML 200.14 200.14
08.03.05 PRUEBA HIDR.+DESINFEC.DE TUB. ZANJA TAPADA 1" (25MM) ML 2,825.37 2,825.37
08.03.06 PRUEBA HIDR.+DESINFEC.DE TUB. ZANJA TAPADA 1 1/2" (35MM) ML 200.14 200.14

08.04.00 ACCESORIOS
08.04.01 TAPON DE PVC D=1" (25mm) UND 18 18.00
08.04.02 CODO PVC SP DE 1" X 22.5° PARA AGUA UND 40 40.00
08.04.03 CODO PVC SP DE 1 1/2" X 22.5° PARA AGUA UND 1 1.00
08.04.04 CODO PVC SP DE 1" X 45° PARA AGUA UND 22 22.00
08.04.05 CODO PVC SP DE 1 1/2" X 45° PARA AGUA UND 3 3.00
08.04.06 CODO PVC SP DE 1" X 90° PARA AGUA UND 26 26.00
08.04.07 CODO PVC SP DE 1 1/2" X 90° PARA AGUA UND 1 1.00
08.04.08 TEE PVC SP DE 1" PARA AGUA UND 34 34.00
08.04.09 TEE PVC SP DE 1 1/2" PARA AGUA UND 2 2.00
08.04.10 REDUCCION PVC SP DE 1 1/2" x 1" PARA AGUA UND 5 5.00
08.04.11 VALVULA COMPUERTA DE BRONCE 1" PZA 1 1.00
08.04.12 VALVULA COMPUERTA DE BRONCE 1 1/2" PZA 1 1.00
08.04.13 VALVULA DE PURGA DE BRONCE 1" PZA 2 2.00
08.04.14 DADOS DE ANCLAJE PARA ACCESORIOS UND 156 156.00
08.04.15 INSTALACION DE ACCESORIOS PVC S.P. 2 UND 156 156.00
08.04.16 CAJA DE PROTECCION P/VALV. DE 2" INC/EXCAV., RELLENO UND 4 4.00
E RED DE DISTRIBUCION DE AGUA POTABLE
FECHA : ENE. 2008

Total

3,630.61

3,630.61
3,630.61

3,025.51
3,025.51
3,025.51
3,025.51
3,025.51

2,825.37
200.14
2,825.37
200.14
2,825.37
200.14

18.00
40.00
1.00
22.00
3.00
26.00
1.00
34.00
2.00
5.00
1.00
1.00
2.00
156.00
156.00
4.00
HOJA DE METRADO DE CONEXIONES DOMICILIARIAS
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA FECHA : ENE. 2008

LONG. MEDIDAS Sub Total


Item DESCRIPCION Und
Nro Veces Largo Alto Ancho Parcial Total

09.00.00 CONEXIONES DOMICILIARIAS


09.01.00 OBRAS PRELIMINARES
09.01.01 LIMPIEZA DE TERRENO MANUAL M2 928.20
De Linea de Aduccion a toda la red 221 3.50 1.20 928.20

09.01.02 TRAZO Y REPLANTEO INICIAL M2 Idem 07.01.01 928.20 928.20


09.01.03 TRAZO Y REPLANTEO FINAL M2 Idem 07.01.01 928.20 928.20

09.02.00 MOVIMIENTO DE TIERRA


09.02.01 EXCAVACION DE ZANJAS MANUAL DE 0.60x1.10 m ML 221 3.50 773.50 773.50
09.02.02 REFINE Y NIVELACION DE ZANJA ML 221 3.50 773.50 773.50
09.02.03 RELLENO COMPACTADO C/PLANCHA VIBRADOR DE 0.60x1.00 ML 221 3.50 773.50 773.50

09.03.00 OBRAS DE CONCRETO SIMPLE


09.03.01 CONCRETO F'C 140KG/CM2 P/GRADA Y/O PISO SIMPLE M3 90.00
Distancia de calles con Concreto 1,000.00 0.10 0.90 90.00

09.03.02 ENCOFRADO Y DESENCOFRADO NORMAL M2 212.00


Largo del tramo 2 1,000.00 0.10 200.00
Descanso del Tramo 100 1.20 0.10 12.00

09.04.00 CONEXION DOMICILIARIA


09.04.01 SUM E INST CONEXION DOMICILIARIA DE AGUA UND 221 221.00 221.00
HOJA DE METRADO DE CONEXIONES DOMICILIARIAS
OBRA : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SAYLAPA

LONG. MEDIDAS
Item DESCRIPCION Und
Nro Veces Largo Alto Ancho

10.00.00 PLAN DE MANEJO AMBIENTAL


10.01.00 ETAPA DE CONSTRUCCION
10.01.01 PROGRAMAS DE MEDIDAS PREVENTIVAS Y/O CORRECTIVAS GLB 1
10.01.02 PROGRAMAS DE CAPACITACION Y EDUCACION AMBIENTAL GLB 1
10.01.03 PROGRAMA DE MANEJO DE RISIDUOS SOLIDOS GLB 1
10.01.04 PROGRAMA DE CONTINGENCIAS GLB 1
ICILIARIAS
FECHA : ENE. 2008

MEDIDAS Sub Total


Parcial Total

1.00 1.00 1.00


1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00