UBICACIÓN : SONDOR
CONTRATISTA : CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.)
ENTIDAD : GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
INSPECTOR DE OBRA : ING°. FELIPE PURISACA SOSA
MONTO CONTRATADO : S/ 13,977,395.88 con IGV
: S/ 11,845,250.75 sin IGV
RESUMEN DE VALORIZACIONES
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19
ITEM PARTIDAS PARCIALES ACUMULADOS % SALDOS %
May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20
1 O.P - CAPTACION - L.C-CDC 2,811,840.24 0.00 617,671.54 29,699.28 98,334.08 71,988.95 40,897.25 156,629.19 298,058.51 262,519.61 339,397.81 237,550.94 -757.08 187,422.77 59,617.47 0.00 0.00 0.00 0.00 0.00 2,399,030.32 85.32% 412,809.92 14.68%
3 Reservorio Caserios 183,240.86 0.00 7,650.51 0.00 3,374.56 0.00 41,248.23 26,291.12 10,178.86 14,666.33 884.45 12,351.74 5,089.45 30,857.83 4,963.02 0.00 0.00 0.00 0.00 0.00 157,556.10 85.98% 25,684.76 14.02%
5 Impacto Ambiental 44,649.46 0.00 0.00 0.00 11,660.99 8,329.28 0.00 3,331.71 3,331.71 3,331.71 0.00 0.00 1,665.86 5,666.18 6,198.80 0.00 0.00 0.00 0.00 0.00 43,516.24 97.46% 1,133.22 2.54%
6 Educación Sanitaria 125,844.50 0.00 0.00 0.00 46,575.00 36,547.00 0.00 20,585.00 0.00 5,002.50 517.50 0.00 0.00 8,308.75 8,308.75 0.00 0.00 0.00 0.00 0.00 125,844.50 100.00% 0.00 0.00%
7 Equipamiento de JASS 34,171.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34,171.71 0.00 0.00 0.00 0.00 0.00 34,171.71 100.00% 0.00 0.00%
8 Monitoreo Arqueologico 23,728.81 0.00 2,372.89 2,372.89 2,372.89 11,864.41 2,372.89 2,372.89 -0.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23,728.81 100.00% 0.00 0.00%
TOTALES 11,845,250.76 0.00 1,087,277.04 779,326.91 1,244,414.39 1,469,192.64 1,732,453.18 994,235.96 790,947.27 622,166.82 559,822.95 948,131.99 240,176.17 440,351.87 188,242.85 33,284.44 0.00 0.00 0.00 0.00 11,130,024.48 93.96% 715,226.28 6.04%
ACUMULADOS 0.00 1,087,277.04 1,866,603.95 3,111,018.34 4,580,210.98 6,312,664.16 7,306,900.12 8,097,847.39 8,720,014.21 9,279,837.16 10,227,969.15 10,468,145.32 10,908,497.19 11,096,740.04 11,130,024.48
PORCENTAJE DE AVANCE MENSUAL 9.18% 6.58% 10.51% 12.40% 14.63% 8.39% 6.68% 5.25% 4.73% 8.00% 2.03% 3.72% 1.59% 0.28%
PORCENTAJE ACUMULADO 0.00% 9.18% 15.76% 26.26% 38.67% 53.29% 61.69% 68.36% 73.62% 78.34% 86.35% 88.37% 92.09% 93.68% 93.96%
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
OP-Capt-LC-DCD Página 3
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
OP-Capt-LC-DCD Página 4
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
01 LINEA DE CONDUCCION
01.01 LINEA DE CONDUCCION LC (CATACION-PTAP-RESERVORIOS)
01.01.01 OBRAS PRELIMINARES
01.01.01.01 TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACION TOTAL KM 20.37 483.98 9,858.67 20.17 9,761.88 99.02% 0.00 0.00 0.00% 20.17 9,761.88 99.02% 0.20 96.79 0.98%
01.01.01.02 REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL KM 20.37 173.96 3,543.57 20.17 3,507.96 99.00% 0.00 0.00 0.00% 20.17 3,507.96 99.00% 0.20 35.61 1.00%
01.01.01.03 LIMPIEZA Y DEFORESTACIÓN DE TERRENO m 6,110.37 0.20 1,222.07 6,110.37 1,222.07 100.00% 0.00 0.00 0.00% 6,110.37 1,222.07 100.00% 0.00 0.00 0.00%
01.01.01.04 CINTA PLASTICA SEÑALIZADORA PARA LIMITE DE SEGURIDAD DE OBRA m 20,367.90 0.88 17,923.75 20,167.90 17,747.75 99.02% 0.00 0.00 0.00% 20,167.90 17,747.75 99.02% 200.00 176.00 0.98%
01.01.01.05 LIMPIEZA Y DEFORESTACIÓN DE TERRENO m 6,110.37 0.20 1,222.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6,110.37 1,222.07 100.00%
01.01.02 MOVIMIENTO DE TIERRAS
01.01.02.01 REFINE Y CORTE EN TERRENO ROCOSO CON COMPRESORA (SIN EXPLOSIVOS) m3 5.10 164.81 840.53 5.10 840.53 100.00% 0.00 0.00 0.00% 5.10 840.53 100.00% 0.00 0.00 0.00%
01.01.02.02 EXCAV. ZANJA (MAQUINA) P/TUB. TERRENO SEMIRROCOSO DN 110-160mm DE 1.00m A 1.5 m 20,216.60 12.08 244,216.53 20,016.60 241,800.53 99.01% 0.00 0.00 0.00% 20,016.60 241,800.53 99.01% 200.00 2,416.00 0.99%
01.01.02.03 REFINE Y NIVELACION ZANJA T. SEMIRROCOSO PARA TUB. DN 110-160 PARA TODA PROF. m 20,216.60 1.97 39,826.70 20,016.60 39,432.70 99.01% 0.00 0.00 0.00% 20,016.60 39,432.70 99.01% 200.00 394.00 0.99%
01.01.02.04 RELLENO COMP. ZANJA (PULSO) T-SEMIRROCOSO - DN 110 A 160mm H=1.01 A 1.25M m 20,216.60 23.63 477,718.26 20,016.60 472,992.26 99.01% 0.00 0.00 0.00% 20,016.60 472,992.26 99.01% 200.00 4,726.00 0.99%
01.01.02.05 ELIMINACION Y ACOMODO DE MATERIAL EXCEDENTE A ZONA ALEDAÑA P/TUBERIA DN 110 m 6,110.37 14.50 88,600.37 5,910.37 85,700.37 96.73% 0.00 0.00 0.00% 5,910.37 85,700.37 96.73% 200.00 2,900.00 3.27%
01.01.03 SUMINISTRO E INSTALACION DE TUBERIA PVC-U UF, ISO 1452:2011/16422:2012
01.01.03.01 TUBERIA PVC-U, NTP ISO 16422:2012, PN-7.5 DN 160 MM INCL. ANILLO+2% DESPERDICIOS. m 4,798.70 39.31 188,636.90 4,598.70 180,774.90 95.83% 0.00 0.00 0.00% 4,598.70 180,774.90 95.83% 200.00 7,862.00 4.17%
01.01.03.02 TUBERIA H°D° BRIDADA, DN 150 MM, K9 ISO 2531, INCL. ANILLO+2% DESPERDICIOS m 151.30 153.89 23,283.56 151.30 23,283.56 100.00% 0.00 0.00 0.00% 151.30 23,283.56 100.00% 0.00 0.00 0.00%
01.01.03.03 TUBERIA PVC-U, NTP ISO 16422:2012, PN-10 DN 110 MM INCL. ANILLO+2% DESPERDICIOS. m 11,636.68 21.63 251,701.39 11,636.68 251,701.39 100.00% 0.00 0.00 0.00% 11,636.68 251,701.39 100.00% 0.00 0.00 0.00%
01.01.03.04 TUBERIA PVC-U, NTP ISO 16422:2012, PN-10 DN 90 MM INCL. ANILLO+2% DESPERDICIOS. m 1,350.00 14.24 19,224.00 1,350.00 19,224.00 100.00% 0.00 0.00 0.00% 1,350.00 19,224.00 100.00% 0.00 0.00 0.00%
01.01.03.05 TUBERIA PVC-U, NTP ISO 1452:2011, PN-10 DN 63 MM INCL. ANILLO+2% DESPERDICIOS. m 2,431.22 7.08 17,213.04 2,431.22 17,213.04 100.00% 0.00 0.00 0.00% 2,431.22 17,213.04 100.00% 0.00 0.00 0.00%
01.01.03.06 INSTALACION TUBERIA PVC P/AGUA POTAB. DN 160MM m 4,798.70 1.71 8,205.78 4,598.70 7,863.78 95.83% 0.00 0.00 0.00% 4,598.70 7,863.78 95.83% 200.00 342.00 4.17%
01.01.03.07 INSTALACION TUBERIA H°D° BRIDADA, DN 150 MM m 151.30 1.17 177.02 151.30 177.02 100.00% 0.00 0.00 0.00% 151.30 177.02 100.00% 0.00 0.00 0.00%
01.01.03.08 INSTALACION TUBERIA PVC P/AGUA POTAB. DN 110MM m 11,636.68 1.35 15,709.52 11,636.68 15,709.52 100.00% 0.00 0.00 0.00% 11,636.68 15,709.52 100.00% 0.00 0.00 0.00%
01.01.03.09 INSTALACION TUBERIA PVC P/AGUA POTAB. DN 90MM m 1,350.00 0.99 1,336.50 1,350.00 1,336.50 100.00% 0.00 0.00 0.00% 1,350.00 1,336.50 100.00% 0.00 0.00 0.00%
01.01.03.10 INSTALACION TUBERIA PVC P/AGUA POTAB. DN 63MM m 2,431.22 0.96 2,333.97 2,431.22 2,333.97 100.00% 0.00 0.00 0.00% 2,431.22 2,333.97 100.00% 0.00 0.00 0.00%
01.01.03.11 PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INC. DESINFECCIÓN) DN 160mm m 4,798.70 4.12 19,770.64 4,598.70 18,946.64 95.83% 0.00 0.00 0.00% 4,598.70 18,946.64 95.83% 200.00 824.00 4.17%
01.01.03.12 PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INC. DESINFECCIÓN) DN 150mm m 151.30 3.41 515.93 151.30 515.93 100.00% 0.00 0.00 0.00% 151.30 515.93 100.00% 0.00 0.00 0.00%
01.01.03.13 PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INC. DESINFECCIÓN) DN 110mm m 11,636.68 3.28 38,168.31 11,636.68 38,168.31 100.00% 0.00 0.00 0.00% 11,636.68 38,168.31 100.00% 0.00 0.00 0.00%
01.01.03.14 PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INC. DESINFECCIÓN) DN 90mm m 1,350.00 3.31 4,468.50 1,350.00 4,468.50 100.00% 0.00 0.00 0.00% 1,350.00 4,468.50 100.00% 0.00 0.00 0.00%
01.01.03.15 PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INC. DESINFECCIÓN) DN 63mm m 2,431.22 3.21 7,804.22 2,431.22 7,804.22 100.00% 0.00 0.00 0.00% 2,431.22 7,804.22 100.00% 0.00 0.00 0.00%
01.01.04 SUMINISTRO E INSTALACION DE ACCESORIOS PVC-UF
01.01.04.01 SUMINISTRO CODO/CURVA PVC UF ISO 1452:2011/16422:2012 DN 160 MM 45° INCL. ANILLO und 128.00 70.60 9,036.80 128.00 9,036.80 100.00% 0.00 0.00 0.00% 128.00 9,036.80 100.00% 0.00 0.00 0.00%
01.01.04.02 SUMINISTRO CODO/CURVA PVC UF ISO 1452:2011/16422:2012 DN 150 MM 45° INCL. ANILLO und 8.00 70.60 564.80 8.00 564.80 100.00% 0.00 0.00 0.00% 8.00 564.80 100.00% 0.00 0.00 0.00%
01.01.04.03 SUMINISTRO CODO/CURVA PVC UF ISO 1452:2011/16422:2012 DN 110 MM 45° INCL. ANILLO und 310.00 27.03 8,379.30 310.00 8,379.30 100.00% 0.00 0.00 0.00% 310.00 8,379.30 100.00% 0.00 0.00 0.00%
01.01.04.04 SUMINISTRO CODO/CURVA PVC UF ISO 1452:2011/16422:2012 DN 110 MM 90° INCL. ANILLO und 15.00 41.12 616.80 15.00 616.80 100.00% 0.00 0.00 0.00% 15.00 616.80 100.00% 0.00 0.00 0.00%
01.01.04.05 SUMINISTRO CODO/CURVA PVC UF ISO 1452:2011/16422:2012 DN 90 MM 45° INCL. ANILLO und 14.00 22.79 319.06 14.00 319.06 100.00% 0.00 0.00 0.00% 14.00 319.06 100.00% 0.00 0.00 0.00%
01.01.04.06 SUMINISTRO CODO/CURVA PVC UF ISO 1452:2011/16422:2012 DN 90 MM 90° INCL. ANILLO und 2.00 21.53 43.06 2.00 43.06 100.00% 0.00 0.00 0.00% 2.00 43.06 100.00% 0.00 0.00 0.00%
01.01.04.07 SUMINISTRO CODO/CURVA PVC UF ISO 1452:2011/16422:2012 DN 63 MM 45° INCL. ANILLO und 25.00 6.38 159.50 25.00 159.50 100.00% 0.00 0.00 0.00% 25.00 159.50 100.00% 0.00 0.00 0.00%
01.01.04.08 SUMINISTRO CODO/CURVA PVC UF ISO 1452:2011/16422:2012 DN 63 MM 90° INCL. ANILLO und 1.00 8.36 8.36 1.00 8.36 100.00% 0.00 0.00 0.00% 1.00 8.36 100.00% 0.00 0.00 0.00%
01.01.04.09 INSTALAC. DE ACCESORIOS PVC U UR AGUA POTABLE DE 110 - 160 MM und 503.00 10.94 5,502.82 503.00 5,502.82 100.00% 0.00 0.00 0.00% 503.00 5,502.82 100.00% 0.00 0.00 0.00%
01.01.04.10 CONCRETO FC=140 KG/CM2 PARA ANCLAJES DE ACCESORIOS DN 110-160 MM und 503.00 40.39 20,316.17 503.00 20,316.17 100.00% 0.00 0.00 0.00% 503.00 20,316.17 100.00% 0.00 0.00 0.00%
OP-Capt-LC-DCD Página 5
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
OP-Capt-LC-DCD Página 6
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
GASTOS GENERALES RELACIONADOS CON EL TIEMPO DE EJECUCION DE LA OBRA (GASTOS 5.1765349% 117,948.96 100,811.78 0.00 100,811.78 17,137.18
VARIABLES)
UTILIDAD 7.00% 159,497.18 136,323.33 0.00 136,323.33 23,173.86
SUB TOTAL 2,582,111.47 2,206,948.23 0.00 2,206,948.23 375,163.25
IGV (18%) 464,780.06 397,250.68 0.00 397,250.68 67,529.39
PRESUPUESTO TOTAL 3,046,891.53 2,604,198.91 0.00 2,604,198.91 442,692.64
OP-Capt-LC-DCD Página 7
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
OP-Capt-LC-DCD Página 8
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
OP-Capt-LC-DCD Página 9
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
OP-Capt-LC-DCD Página 10
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE PIURA
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
Reserv. Página 18
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - D
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
Reserv. Página 19
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - D
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
Reserv. Página 20
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - D
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
Reserv. Página 21
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - D
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
Reserv. Página 22
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - D
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
Reserv. Página 23
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - D
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
Reserv. Página 24
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - D
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
Reserv. Página 25
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - D
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
Reserv. Página 26
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - D
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
Reserv. Página 27
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - D
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
Reserv. Página 28
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - D
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
Redes-UBS Página 29
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - D
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
Redes-UBS Página 30
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - D
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
Redes-UBS Página 31
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - D
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
Redes-UBS Página 32
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - D
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
Redes-UBS Página 33
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - D
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
01 LETRINA - UBS
01.01 TRABAJO PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL m2 1527.12 2.52 3,848.34 1,512.02 3,810.29 99.01% 0.00 0.00 0.00% 1,512.02 3,810.29 99.01% 15.10 38.05 0.99%
01.01.02 TRAZO, NIVELES Y REPLANTEO INICIAL DE EDIFICACIONES m2 1527.12 1.98 3,023.70 1,512.02 2,993.80 99.01% 0.00 0.00 0.00% 1,512.02 2,993.80 99.01% 15.10 29.90 0.99%
01.02 MOVIMIENTO DE TIERRAS
01.02.01 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS Y ZAPATAS m3 457.53 50.46 23,086.96 453.00 22,858.38 99.01% 0.00 0.00 0.00% 453.00 22,858.38 99.01% 4.53 228.58 0.99%
01.02.02 RELLENO COMPACTADO CON AFIRMADO m3 457.53 103.26 47,244.55 453.00 46,776.78 99.01% 0.00 0.00 0.00% 453.00 46,776.78 99.01% 4.53 467.77 0.99%
01.02.03 ELIMINACION DE MATERIAL EXCEDENTE A 200 M DE DIST. INCL. ESPONJA m3 548.43 36.25 19,880.59 543.00 19,683.75 99.01% 0.00 0.00 0.00% 543.00 19,683.75 99.01% 5.43 196.84 0.99%
01.03 OBRAS DE CONCRETO SIMPLE
01.03.01 SOLADOS DE CONCRETO F'C=100KG/CM² m2 1527.12 30.75 46,958.94 1,512.00 46,494.00 99.01% 0.00 0.00 0.00% 1,512.00 46,494.00 99.01% 15.12 464.94 0.99%
01.04 OBRAS DE CONCRETO ARMADO
01.04.01 CONCRETO F'C =175 KG/CM2 PARA BASE m3 151.5 360.56 54,624.84 150.00 54,084.00 99.01% 0.00 0.00 0.00% 150.00 54,084.00 99.01% 1.50 540.84 0.99%
01.04.02 ACERO F'Y=4200 KG/CM2 kg 3866.28 3.89 15,039.83 3,828.00 14,890.92 99.01% 0.00 0.00 0.00% 3,828.00 14,890.92 99.01% 38.28 148.91 0.99%
01.04.03 CONCRETO F'C=175 KG/CM2 SOBRECIMIENTO m3 87.87 409.77 36,006.49 86.99 35,645.89 99.00% 0.00 0.00 0.00% 86.99 35,645.89 99.00% 0.88 360.60 1.00%
01.04.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 1181.7 38.5 45,495.45 1,170.00 45,045.00 99.01% 0.00 0.00 0.00% 1,170.00 45,045.00 99.01% 11.70 450.45 0.99%
01.05 MUROS Y TABIQUES DE ALBAÑILERIA
01.05.01 MURO DE LADRILLO 9 x 13 x 24 cm. MAQUINADO DE SOGA m2 4011.72 59.45 238,496.75 3,972.00 236,135.40 99.01% 0.00 0.00 0.00% 3,972.00 236,135.40 99.01% 39.72 2,361.35 0.99%
01.05.02 MURO DE LADRILLO 9 x 13 x 24 cm. MAQUINADO DE CANTO m2 109.08 41.75 4,554.09 108.00 4,509.00 99.01% 0.00 0.00 0.00% 108.00 4,509.00 99.01% 1.08 45.09 0.99%
01.06 PISOS
01.06.01 PISO CEMENTO PULIDO m2 1199.88 27.65 33,176.68 1,188.00 32,848.20 99.01% 0.00 0.00 0.00% 1,188.00 32,848.20 99.01% 11.88 328.48 0.99%
01.07 ZOCALOS Y CONTRAZOCALOS
01.07.01 CONTRAZOCALOS
01.07.01.01 CONTRAZÓCALO DE CEMENTO S/COLOREAR, H=25 cm. m2 1308.96 12.51 16,375.09 1,296.00 16,212.96 99.01% 0.00 0.00 0.00% 1,296.00 16,212.96 99.01% 12.96 162.13 0.99%
01.08 COBERTURA
01.08.01 SUMINISTRO Y COLOCACION DE TEJA ANDINA DE 1,14x0,72 m.x 2mm m2 1527.12 59.68 91,138.52 1,511.99 90,235.85 99.01% 0.00 0.00 0.00% 1,511.99 90,235.85 99.01% 15.13 902.67 0.99%
01.08.02 COLOCACIÓN DE CORREAS DE MADERA TORNILLO DE 2"x2". m 4726.8 15.52 73,359.94 4,680.00 72,633.60 99.01% 0.00 0.00 0.00% 4,680.00 72,633.60 99.01% 46.80 726.34 0.99%
01.09 CARPINTERIA METALICA
01.09.01 PUERTA DE CALAMINA F°G° E=0.27MM, MARCO DE MADERA m2 402.99 180.61 72,784.02 399.00 72,063.39 99.01% 0.00 0.00 0.00% 399.00 72,063.39 99.01% 3.99 720.63 0.99%
01.09.02 VENTANA DE MALLA METALICA m2 121.2 174.98 21,207.58 120.00 20,997.60 99.01% 0.00 0.00 0.00% 120.00 20,997.60 99.01% 1.20 209.98 0.99%
01.10 VARIOS
01.10.01 LIMPIEZA GENERAL DE OBRA m2 1527.12 1.28 1,954.71 1,512.00 1,935.36 99.01% 0.00 0.00 0.00% 1,512.00 1,935.36 99.01% 15.12 19.35 0.99%
01.11 INSTALACIONES SANITARIAS
01.11.01 SISTEMA DE AGUA FRIA
01.11.01.01 SALIDA DE AGUA FRIA CON TUBERIA PVC-SAP DE 1/2'' pto 1212 58.58 70,998.96 1,200.00 70,296.00 99.01% 0.00 0.00 0.00% 1,200.00 70,296.00 99.01% 12.00 702.96 0.99%
01.11.01.02 RED DE DISTRIBUCION TUBERIA DE PVC-SAP CLASE-10 Ø 1/2" m 3336.03 21.9 73,059.06 3,303.00 72,335.70 99.01% 0.00 0.00 0.00% 3,303.00 72,335.70 99.01% 33.03 723.36 0.99%
01.11.01.03 SUMINISTRO E INSTALACION TEE PVC 1/2" x 1/2" und 909 11.84 10,762.56 900.00 10,656.00 99.01% 0.00 0.00 0.00% 900.00 10,656.00 99.01% 9.00 106.56 0.99%
01.11.01.04 SUMINISTRO E INSTALACIÓN DE CODO DE Ø 1/2" x 90°- PVC und 4242 4.4 18,664.80 4,200.00 18,480.00 99.01% 0.00 0.00 0.00% 4,200.00 18,480.00 99.01% 42.00 184.80 0.99%
01.11.01.05 SUMINISTRO E INSTALACIÓN DE VALVULA COMPUERTA DE Ø 1/2" und 606 46.85 28,391.10 600.00 28,110.00 99.01% 0.00 0.00 0.00% 600.00 28,110.00 99.01% 6.00 281.10 0.99%
01.11.01.06 CAJA DE VALVULAS DE MADERA und 606 66.57 40,341.42 600.00 39,942.00 99.01% 0.00 0.00 0.00% 600.00 39,942.00 99.01% 6.00 399.42 0.99%
01.11.02 SISTEMA DE DESAGUE Y VENTILACION
01.11.02.01 SUMINISTRO E INSTALACION DE TUBERIA PVC-SAL DE Ø 4'' PARA DESAGU m 909 28.97 26,333.73 900.00 26,073.00 99.01% 0.00 0.00 0.00% 900.00 26,073.00 99.01% 9.00 260.73 0.99%
01.11.02.02 SUMINISTRO E INSTALACION DE TUBERIA PVC-SAL DE Ø 2'' PARA DESAGU m 4393.5 19.33 84,926.36 4,350.00 84,085.50 99.01% 0.00 0.00 0.00% 4,350.00 84,085.50 99.01% 43.50 840.86 0.99%
01.11.02.03 SALIDA DE PVC-SAL DE 4'' PARA DESAGUE pto 606 71.77 43,492.62 600.00 43,062.00 99.01% 0.00 0.00 0.00% 600.00 43,062.00 99.01% 6.00 430.62 0.99%
01.11.02.04 SALIDA DE PVC-SAL DE 2'' PARA DESAGUE pto 1212 43.99 53,315.88 1,200.00 52,788.00 99.01% 0.00 0.00 0.00% 1,200.00 52,788.00 99.01% 12.00 527.88 0.99%
01.11.02.05 SALIDA DE PVC-SAL DE 2'' PARA VENTILACION pto 303 37.5 11,362.50 300.00 11,250.00 99.01% 0.00 0.00 0.00% 300.00 11,250.00 99.01% 3.00 112.50 0.99%
Redes-UBS Página 34
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - D
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
Redes-UBS Página 35
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - D
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
Redes-UBS Página 36
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DE
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
GASTOS GENERALES RELACIONADOS CON EL TIEMPO DE EJECUCION DE LA 5.1765349% 2,039.55 1,987.79 0.00 1,987.79 51.77
OBRA (GASTOS VARIABLES)
UTILIDAD 7.00% 2,758.00 2,688.00 0.00 2,688.00 70.00
SUB TOTAL 44,649.46 43,516.23 0.00 43,516.23 1,133.24
IGV (18%) 8,036.90 7,832.92 0.00 7,832.92 203.98
PRESUPUESTO TOTAL 52,686.36 51,349.15 0.00 51,349.15 1,337.22
Imp.Amb.-E.San.-E.JASS-Mon.Arq Página 37
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DE
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
01.02.00 Talleres de Capacitación en Operación y Mantenimiento de sistemas de agua mes 7 4,000.00 28,000.00 7.00 28,000.00 100.00% 0.00 0.00 0.00% 7.00 28,000.00 100.00% 0.00 0.00 0.00%
potable y saneamiento.
01.03.00 Talleres en Gestion y Administración de Sistema de Ahua Potable y mes 7 3,500.00 24,500.00 7.00 24,500.00 100.00% 0.00 0.00 0.00% 7.00 24,500.00 100.00% 0.00 0.00 0.00%
Saneamiento.
01.04.00 Material educativo (manual de educación sanitaria, tripticos, toalla, jabon, und 254 45.00 11,430.00 254.00 11,430.00 100.00% 0.00 0.00 0.00% 254.00 11,430.00 100.00% 0.00 0.00 0.00%
gotero).
01.05.00 Informacion radial de programa de educacion sanitaria mes 7 3,000.00 21,000.00 7.00 21,000.00 100.00% 0.00 0.00 0.00% 7.00 21,000.00 100.00% 0.00 0.00 0.00%
COSTO DIRECTO 109,430.00 109,430.00 0.00 109,430.00 0.00
GASTOS GENERALES (8%) 8,754.40 8,754.40 0.00 8,754.40 0.00
UTILIDAD (7%) 7,660.10 7,660.10 0.00 7,660.10 0.00
SUB TOTAL 125,844.50 125,844.50 0.00 125,844.50 0.00
IMPUESTO GENERAL A LAS VENTAS (18%) 22,652.01 22,652.01 0.00 22,652.01 0.00
TOTAL 148,496.51 148,496.51 0.00 148,496.51 0.00
Imp.Amb.-E.San.-E.JASS-Mon.Arq Página 38
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DE
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
EQUIPAMIENTO DE JASS
1.00 Oficina Administrativa
1.10 Computadora Und. 2.00 2,160.00 4,320.00 2.00 4,320.00 100.00% 0.00 0.00 0.00% 2.00 4,320.00 100.00% 0.00 0.00 0.00%
1.20 Impresora Und. 2.00 500.00 1,000.00 2.00 1,000.00 100.00% 0.00 0.00 0.00% 2.00 1,000.00 100.00% 0.00 0.00 0.00%
1.30 Escritorio (1.8 x 0.85) Und. 4.00 405.00 1,620.00 4.00 1,620.00 100.00% 0.00 0.00 0.00% 4.00 1,620.00 100.00% 0.00 0.00 0.00%
1.40 Estante de Metal de 2 x 0.8 x 0.3 Und. 3.00 300.00 900.00 3.00 900.00 100.00% 0.00 0.00 0.00% 3.00 900.00 100.00% 0.00 0.00 0.00%
1.50 Sillas Und. 8.00 115.00 920.00 8.00 920.00 100.00% 0.00 0.00 0.00% 8.00 920.00 100.00% 0.00 0.00 0.00%
1.60 Utiles de escritorio glb 1.00 0.00 0.00 1.00 0.00 100.00% 0.00 0.00 0.00% 1.00 0.00 100.00% 0.00 0.00 0.00%
2.00 Operación y Mantenimiento del Sistema
2.1 Herramientas
2.1.1 Anteojos de seguridad Und. 2.00 15.50 31.00 2.00 31.00 100.00% 0.00 0.00 0.00% 2.00 31.00 100.00% 0.00 0.00 0.00%
2.1.2 Llaves fijas Juego 2.00 307.20 614.40 2.00 614.40 100.00% 0.00 0.00 0.00% 2.00 614.40 100.00% 0.00 0.00 0.00%
2.1.3 Llave p/grifo Und. 2.00 18.00 36.00 2.00 36.00 100.00% 0.00 0.00 0.00% 2.00 36.00 100.00% 0.00 0.00 0.00%
2.1.4 Llave estilson juego 10" a 18" Juego 2.00 479.23 958.46 2.00 958.46 100.00% 0.00 0.00 0.00% 2.00 958.46 100.00% 0.00 0.00 0.00%
2.1.5 Llave francesa juego (8" - 18") Juego 2.00 731.16 1,462.33 2.00 1,462.33 100.00% 0.00 0.00 0.00% 2.00 1,462.33 100.00% 0.00 0.00 0.00%
2.1.6 Arco de sierra tubular Und. 2.00 12.65 25.30 2.00 25.30 100.00% 0.00 0.00 0.00% 2.00 25.30 100.00% 0.00 0.00 0.00%
2.1.7 Desarmadores juego de 10 piezas Juego 1.00 67.09 67.09 1.00 67.09 100.00% 0.00 0.00 0.00% 1.00 67.09 100.00% 0.00 0.00 0.00%
2.1.8 Alicate mecánico Und. 2.00 14.28 28.56 2.00 28.56 100.00% 0.00 0.00 0.00% 2.00 28.56 100.00% 0.00 0.00 0.00%
2.1.9 Espátula de 6" x 15 Und. 2.00 28.56 57.12 2.00 57.12 100.00% 0.00 0.00 0.00% 2.00 57.12 100.00% 0.00 0.00 0.00%
2.1.10 Pala c/cuchara Und. 2.00 44.23 88.45 2.00 88.45 100.00% 0.00 0.00 0.00% 2.00 88.45 100.00% 0.00 0.00 0.00%
2.1.11 Comba de acero forjado 4 libras Und. 2.00 126.69 253.38 2.00 253.38 100.00% 0.00 0.00 0.00% 2.00 253.38 100.00% 0.00 0.00 0.00%
2.2 Materiales 0.00 0.00
2.2.01 Tubería de 2 1/2" Ml 600.00 0.00 600.00 0.00 100.00% 0.00 0.00 0.00% 600.00 0.00 100.00% 0.00 0.00 0.00%
2.2.02 Tubería de 2" Ml 598.00 7.20 4,303.88 598.00 4,303.88 100.00% 0.00 0.00 0.00% 598.00 4,303.88 100.00% 0.00 0.00 0.00%
2.2.03 Tubería de 1 1/2" Ml 238.50 4.80 1,144.34 238.50 1,144.34 100.00% 0.00 0.00 0.00% 238.50 1,144.34 100.00% 0.00 0.00 0.00%
2.2.04 Tubería de 1/2" Ml 500.00 2.14 1,071.00 500.00 1,071.00 100.00% 0.00 0.00 0.00% 500.00 1,071.00 100.00% 0.00 0.00 0.00%
2.2.05 "T" 2 1/2" Und. 10.00 14.28 142.80 10.00 142.80 100.00% 0.00 0.00 0.00% 10.00 142.80 100.00% 0.00 0.00 0.00%
2.2.06 "T" 2" Und. 50.00 10.20 509.80 50.00 509.80 100.00% 0.00 0.00 0.00% 50.00 509.80 100.00% 0.00 0.00 0.00%
2.2.07 "T" 1 1/2" Und. 10.00 7.80 77.97 10.00 77.97 100.00% 0.00 0.00 0.00% 10.00 77.97 100.00% 0.00 0.00 0.00%
2.2.08 Reducción 2 1/2" a 1/2" Und. 10.00 5.71 57.12 10.00 57.12 100.00% 0.00 0.00 0.00% 10.00 57.12 100.00% 0.00 0.00 0.00%
2.2.09 Reducción 2" a 1/2" Und. 50.00 5.16 257.75 50.00 257.75 100.00% 0.00 0.00 0.00% 50.00 257.75 100.00% 0.00 0.00 0.00%
2.2.10 Reducción 1 1/2" a 1/2" Und. 10.00 4.28 42.84 10.00 42.84 100.00% 0.00 0.00 0.00% 10.00 42.84 100.00% 0.00 0.00 0.00%
2.2.11 Pegamento PVC Agua Gln 10.00 155.94 1,559.38 10.00 1,559.38 100.00% 0.00 0.00 0.00% 10.00 1,559.38 100.00% 0.00 0.00 0.00%
2.2.12 Cinta Teflón Und. 54.00 1.80 97.16 54.00 97.16 100.00% 0.00 0.00 0.00% 54.00 97.16 100.00% 0.00 0.00 0.00%
2.2.13 Llave Paso PVC 1/2" Und. 100.00 9.60 959.62 100.00 959.62 100.00% 0.00 0.00 0.00% 100.00 959.62 100.00% 0.00 0.00 0.00%
2.2.14 Válvula esférica de bronce de 1 1/2" Und. 11.00 59.98 659.74 11.00 659.74 100.00% 0.00 0.00 0.00% 11.00 659.74 100.00% 0.00 0.00 0.00%
2.2.15 Medidor de caudal chorro unico Ø 1/2" Und 20.00 75.00 1,500.00 20.00 1,500.00 100.00% 0.00 0.00 0.00% 20.00 1,500.00 100.00% 0.00 0.00 0.00%
2.2.16 Válvula esférica de bronce de 2" Und. 10.00 239.90 2,399.04 10.00 2,399.04 100.00% 0.00 0.00 0.00% 10.00 2,399.04 100.00% 0.00 0.00 0.00%
2.2.17 Arena especial para filtro lento m3 30.00 85.00 2,550.00 30.00 2,550.00 100.00% 0.00 0.00 0.00% 30.00 2,550.00 100.00% 0.00 0.00 0.00%
COSTO DIRECTO 29,714.53 29,714.53 0.00 29,714.53 0.00
GASTOS GENERALES (8%) 2,377.16 2,377.16 0.00 2,377.16 0.00
UTILIDAD (7%) 2,080.02 2,080.02 0.00 2,080.02 0.00
SUB TOTAL 34,171.71 34,171.71 0.00 34,171.71 0.00
IMPUESTO GENERAL A LAS VENTAS (18%) 6,150.91 6,150.91 0.00 6,150.91 0.00
TOTAL 40,322.62 40,322.62 0.00 40,322.62 0.00
Imp.Amb.-E.San.-E.JASS-Mon.Arq Página 39
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DE
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
ENTIDAD GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
1 MONITOREO ARQUEOLOGICO
01.01.00 Monitoreo Arqueologico glb 1 20,633.75 20,633.75 1.00 20,633.75 100.00% 0.00 0.00 0.00% 1.00 20,633.75 100.00% 0.00 0.00 0.00%
COSTO DIRECTO 20,633.75 20,633.75 0.00 20,633.75 0.00
GASTOS GENERALES (8%) 1,650.70 1,650.70 0.00 1,650.70 0.00
UTILIDAD (7%) 1,444.36 1,444.36 0.00 1,444.36 0.00
SUB TOTAL 23,728.81 23,728.81 0.00 23,728.81 0.00
IMPUESTO GENERAL A LAS VENTAS (18%) 4,271.19 4,271.19 0.00 4,271.19 0.00
TOTAL 28,000.00 28,000.00 0.00 28,000.00 0.00
Imp.Amb.-E.San.-E.JASS-Mon.Arq Página 40
RESUMEN DE METRADOS
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
“INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PIURA
OBRA
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88 F.R. =
CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S.
CONTRATISTA CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL
MORROPON HUANCABAMBA (GR)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
RESUMEN DE METRADOS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 SALDO DE
TOTAL METRADO TOTAL Control de Metrados Porcentaje de
VALORIZADO METRADO Avance
VALORIZACIÓN N° 01 VALORIZACIÓN N° 02 VALORIZACIÓN N° 03 VALORIZACIÓN N° 04 VALORIZACIÓN N° 05 VALORIZACIÓN N° 06 VALORIZACIÓN N° 07 VALORIZACIÓN N° 08 VALORIZACIÓN N° 09 VALORIZACIÓN N° 10 VALORIZACIÓN N° 11 VALORIZACIÓN N° 12 VALORIZACIÓN N° 13 VALORIZACIÓN N° 14 VALORIZACIÓN N° 15 VALORIZACIÓN N° 16 VALORIZACIÓN N° 17 VALORIZACIÓN N° 18 VALORIZACIÓN N° 19 VALORIZACIÓN N° 20 PRESUPUESTO
Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/.
01 CAPTACION QUEBRADA CHORRO BLANCO
01.01 ACONDICIONAMIENTO DE TALUD PARA CAPTACION
01.01.01 OBRAS PROVISIONALES
01.01.01.01 TRAZO Y REPLANTEO m2 24.00 1.62 38.88 0.00 24.00 38.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.00 38.88 0.00 Metrado PPTO. 100.00%
01.01.02 MOVIMIENTO DE TIERRAS
01.01.02.01 CORTE DE TERRENO ROCOSO MANUAL m3 17.66 131.80 2,327.59 0.00 0.00 0.00 0.00 0.00 17.66 2,327.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.66 2,327.59 0.00 Metrado PPTO. 100.00%
01.01.02.02 ELIMINACION MANUAL DE MATERIAL EXCEDENTE EN T-ROCOSO DP = 100M m3 17.24 90.37 1,557.98 0.00 0.00 0.00 0.00 0.00 17.24 1,557.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.24 1,557.98 0.00 Metrado PPTO. 100.00%
01.02 ACONDICIONAMIENTO DE TERRENO PARA CAPTACION
01.02.01 TRABAJOS PRELIMINARES
01.02.01.01 TRAZO Y REPLANTEO INICIALES m2 13.76 1.62 22.29 0.00 13.76 22.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.76 22.29 0.00 Metrado PPTO. 100.00%
01.02.01.02 TRAZO Y REPLANTEO FINALES m2 13.76 0.70 9.63 0.00 0.00 0.00 0.00 0.00 13.76 9.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.76 9.63 0.00 Metrado PPTO. 100.00%
01.02.02 MOVIMIENTO DE TIERRAS
01.02.02.01 EXCAVACIONES TERRENO ROCOSO PULSO HASTA 2.00 M PROF.(SIN EMPLEAR EXP m3 16.47 132.52 2,182.60 0.00 0.00 0.00 0.00 0.00 16.47 2,182.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.47 2,182.60 0.00 Metrado PPTO. 100.00%
01.02.02.02 REFINE, NIVELACIÓN Y COMPACTACIÓN EN TERRENO ROCOSO m2 13.76 20.26 278.78 0.00 0.00 0.00 0.00 0.00 13.76 278.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.76 278.78 0.00 Metrado PPTO. 100.00%
01.02.02.03 ACARREO MATERIAL PROCEDENTE DE EXCAVACIONES m3 23.06 31.54 727.31 0.00 0.00 0.00 0.00 0.00 23.06 727.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.06 727.31 0.00 Metrado PPTO. 100.00%
01.02.02.04 ACARREO DE MATERIAL PROCEDENTE DE EXCAVACIÓN PARA MANPOSTERÍA D=10" m3 3.78 31.54 119.22 0.00 0.00 0.00 0.00 0.00 3.78 119.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.78 119.22 0.00 Metrado PPTO. 100.00%
01.02.02.05 TRANSPORTE DE PIEDRA MEDIANA/GRANDE A OBRA m3 5.67 63.08 357.66 0.00 0.00 0.00 0.00 0.00 5.67 357.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.67 357.66 0.00 Metrado PPTO. 100.00%
01.02.03 CONCRETO SIMPLE
01.02.03.01 CONCRETO F'C= 100KG/CM2 P/SOLADOS Y/O SUB BASES. m3 0.75 332.52 249.39 0.00 0.00 0.00 0.00 0.00 0.75 249.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 249.39 0.00 Metrado PPTO. 100.00%
01.02.03.02 BARRAJE FIJO DE MAMPOSTERIA DE PIEDRA m3 3.78 411.54 1,555.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.78 1,555.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.78 1,555.62 0.00 Metrado PPTO. 100.00%
01.02.04 CONCRETO ARMADO
01.02.04.01 CONCRETO F'C=245 KG/CM2 P/LOSA DE FONDO-PISO. m3 0.75 498.45 373.84 0.00 0.00 0.00 0.00 0.00 0.00 0.75 373.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 373.84 0.00 Metrado PPTO. 100.00%
01.02.04.02 ENCOFRADO (I/HABILITACIÓN DE MADERA) P/LOSAS DE FONDO-BASE DE BUZÓN, m2 1.03 37.29 38.41 0.00 0.00 0.00 0.00 0.00 0.00 1.03 38.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.03 38.41 0.00 Metrado PPTO. 100.00%
01.02.04.03 ACERO ESTRUC. TRABAJADO P/LOSA DE FONDO (COSTO PROM. INCL. DESPERDICIO kg 52.49 4.18 219.41 0.00 0.00 0.00 0.00 0.00 0.00 52.49 219.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52.49 219.41 0.00 Metrado PPTO. 100.00%
01.02.04.04 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADOS m3 3.94 456.46 1,798.45 0.00 0.00 0.00 0.00 0.00 0.00 3.94 1,798.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.94 1,798.45 0.00 Metrado PPTO. 100.00%
01.02.04.05 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA MUROS RECTOS m2 52.04 58.08 3,022.48 0.00 0.00 0.00 0.00 0.00 0.00 52.04 3,022.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52.04 3,022.48 0.00 Metrado PPTO. 100.00%
01.02.04.06 ACERO ESTRUC. TRABAJADO P/MURO (COSTO PROM. INCL. DESPERDICIOS) kg 225.79 4.31 973.15 0.00 0.00 0.00 0.00 0.00 0.00 225.79 973.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 225.79 973.15 0.00 Metrado PPTO. 100.00%
01.02.04.07 CONCRETO F'C=210 KG/CM2 EN LOSAS MACIZAS m3 0.25 479.39 119.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.25 119.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.25 119.85 0.00 Metrado PPTO. 100.00%
01.02.04.08 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA LOSAS MACIZAS m2 2.58 60.38 155.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.58 155.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.58 155.78 0.00 Metrado PPTO. 100.00%
01.02.04.09 ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIO kg 9.30 4.31 40.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.30 40.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.30 40.08 0.00 Metrado PPTO. 100.00%
01.02.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.05.01 TARRAJEO CON IMPERMEABILIZANTE PARA ESTRUCTURAS HIDRAULICAS m2 13.78 36.18 498.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.78 498.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.78 498.56 0.00 Metrado PPTO. 100.00%
01.02.05.02 TARRAJEO CON IMPERMEABILIZANTE DE MUROS P/CANALES m2 26.54 51.08 1,355.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.54 1,355.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.54 1,355.66 0.00 Metrado PPTO. 100.00%
01.02.06 ADITAMENTOS VARIOS
01.02.06.01 PROVISION Y COLOCACION DE JUNTA WATER STOP DE PVC E=6" m 14.00 23.09 323.26 0.00 0.00 0.00 0.00 0.00 0.00 14.00 323.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 323.26 0.00 Metrado PPTO. 100.00%
01.02.07 EQUIPAMIENTO HIDRAULICO
01.02.07.01 EQUIPAMIENTO E INSTALACION DE ACCESORIOS DESARENADOR und 1.00 3,361.11 3,361.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3,361.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3,361.11 0.00 Metrado PPTO. 100.00%
01.02.08 FLETE DE EQUIPOS Y AGREGADOS A PIE DE CAPTACION
01.02.08.01 TRANSPORTE DE MISCELÁNEOS, HERRAMIENTAS Y EQUIPO A PULSO kg 1,124.40 2.88 3,238.27 0.00 0.00 0.00 0.00 0.00 562.20 1,619.14 281.10 809.57 0.00 281.10 809.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,124.40 3,238.28 0.00 Metrado PPTO. 100.00%
01.02.08.02 TRANSPORTE DE AGREGADO GRUESO A PULSO m3 4.85 2,187.14 10,607.63 0.00 0.00 0.00 0.00 0.00 2.425 5,303.81 1.21 2,646.44 0.00 1.21 2,651.91 0.00 0.00 0.00 0.00 0.00 0.0025 5.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.85 10,607.63 0.00 Metrado PPTO. 100.00%
01.02.08.03 TRANSPORTE DE AGREGADO FINO A PULSO m3 6.03 2,187.14 13,188.45 0.00 0.00 0.00 0.00 0.00 3.02 6,594.23 1.51 3,302.58 0.00 1.51 3,291.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.03 13,188.46 0.00 Metrado PPTO. 100.00%
01.02.08.04 TRANSPORTE DE CEMENTO A PULSO m3 2.32 2,187.14 5,074.16 0.00 0.00 0.00 0.00 0.00 1.16 2,537.08 0.58 1,268.54 0.00 0.58 1,268.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.32 5,074.16 0.00 Metrado PPTO. 100.00%
01.02.08.05 TRANSPORTE DE ACERO A PULSO kg 335.96 1.44 483.78 0.00 0.00 0.00 0.00 0.00 167.98 241.89 83.99 120.95 0.00 83.99 120.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 335.96 483.79 0.00 Metrado PPTO. 100.00%
01.02.09 FLETE PIURA-HUANCABAMBA-SONDOR
01.02.09.01 FLETE DE TRANSPORTE PIURA - HUANCABAMBA - SONDOR / Captación GLB 1.00 1,402.80 1,402.80 0.00 0.80 1,122.24 0.00 0.00 0.00 0.10 140.28 0.00 0.00 0.00 0.00 0.00 0.10 140.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,402.80 0.00 Metrado PPTO. 100.00%
COSTO DIRECTO 55,702.08 0.00 1,183.41 0.00 0.00 24,106.31 15,037.36 0.00 10,312.55 0.00 0.00 140.28 0.00 4,922.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 55,702.11
GASTOS GENERALES NO RELACIONADOS CON EL TIEMPO DE EJECUCION DE LA OBRA 1.1469736% 638.89 0.00 13.57 0.00 0.00 276.49 172.47 0.00 118.28 0.00 0.00 1.61 0.00 56.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 638.89
(GASTOS FIJOS)
GASTOS GENERALES RELACIONADOS CON EL TIEMPO DE EJECUCION DE LA OBRA
(GASTOS VARIABLES) 5.1765349% 2,883.44 0.00 61.26 0.00 0.00 1,247.87 778.41 0.00 533.83 0.00 0.00 7.26 0.00 254.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,883.44
UTILIDAD 7.00% 3,899.15 0.00 82.84 0.00 0.00 1,687.44 1,052.62 0.00 721.88 0.00 0.00 9.82 0.00 344.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,899.15
SUB TOTAL 63,123.56 0.00 1,341.08 0.00 0.00 27,318.11 17,040.86 0.00 11,686.54 0.00 0.00 158.97 0.00 5,578.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 63,123.59
IGV (18%) 11,362.24 0.00 241.39 0.00 0.00 4,917.26 3,067.35 0.00 2,103.58 0.00 0.00 28.61 0.00 1,004.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11,362.25
PRESUPUESTO TOTAL 74,485.80 0.00 1,582.47 0.00 0.00 32,235.37 20,108.21 0.00 13,790.12 0.00 0.00 187.58 0.00 6,582.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 74,485.84
RESUMEN DE METRADOS
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
“INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PIURA
OBRA
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88 F.R. =
CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S.
CONTRATISTA CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL
MORROPON HUANCABAMBA (GR)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
RESUMEN DE METRADOS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 SALDO DE
TOTAL METRADO TOTAL METRADO Control de Metrados Porcentaje de
VALORIZADO Avance
VALORIZACIÓN N° 01 VALORIZACIÓN N° 02 VALORIZACIÓN N° 03 VALORIZACIÓN N° 04 VALORIZACIÓN N° 05 VALORIZACIÓN N° 06 VALORIZACIÓN N° 07 VALORIZACIÓN N° 08 VALORIZACIÓN N° 09 VALORIZACIÓN N° 10 VALORIZACIÓN N° 11 VALORIZACIÓN N° 12 VALORIZACIÓN N° 13 VALORIZACIÓN N° 14 VALORIZACIÓN N° 15 VALORIZACIÓN N° 16 VALORIZACIÓN N° 17 VALORIZACIÓN N° 18 VALORIZACIÓN N° 19 VALORIZACIÓN N° 20 PRESUPUESTO
Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/.
01 LINEA DE CONDUCCION
01.01 LINEA DE CONDUCCION LC (CATACION-PTAP-RESERVORIOS)
01.01.01 OBRAS PRELIMINARES
01.01.01.01 TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACIO KM 20.37 483.98 9,858.67 0.00 20.37 9,858.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -0.20 -96.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.17 9,761.87 0.20 Metrado PPTO. 99.02%
01.01.01.02 REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL KM 20.37 173.96 3,543.57 0.00 0.00 0.00 0.00 0.00 0.60 104.38 1.01 175.93 3.004 522.58 4.84 841.97 0.00 0.00 0.00 10.74 1,868.33 0.00 -0.03 -5.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.17 3,507.97 0.20 Metrado PPTO. 99.00%
01.01.01.03 LIMPIEZA Y DEFORESTACIÓN DE TERRENO m 6,110.37 0.20 1,222.07 0.00 0.00 0.00 0.00 0.00 180.00 36.00 303.39 60.68 901.20 180.24 1,452.00 290.40 1,491.39 298.28 1,345.00 269.00 267.39 53.48 0.00 170.00 34.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,110.37 1,222.08 0.00 Metrado PPTO. 100.00%
01.01.01.04 CINTA PLASTICA SEÑALIZADORA PARA LIMITE DE SEGURIDAD DE OBRA m 20,367.90 0.88 17,923.75 0.00 2,036.79 1,792.38 0.00 0.00 600.00 528.00 1,011.30 889.94 3,004.00 2,643.52 4,840.00 4,259.20 3,721.31 3,274.75 1,933.08 1,701.11 3,051.42 2,685.25 0.00 -30.00 -26.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20,167.90 17,747.75 200.00 Metrado PPTO. 99.02%
01.01.01.05 LIMPIEZA Y DEFORESTACIÓN DE TERRENO m 6,110.37 0.20 1,222.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,940.37 1,188.07 -5,940.37 -1,188.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,110.37 Metrado PPTO. 0.00%
01.01.02 MOVIMIENTO DE TIERRAS
01.01.02.01 REFINE Y CORTE EN TERRENO ROCOSO CON COMPRESORA (SIN EXPLOSIVOS) m3 5.10 164.81 840.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.10 840.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.10 840.53 0.00 Metrado PPTO. 100.00%
01.01.02.02 EXCAV. ZANJA (MAQUINA) P/TUB. TERRENO SEMIRROCOSO DN 110-160mm DE 1 m 20,216.60 12.08 244,216.53 0.00 0.00 0.00 0.00 0.00 600.00 7,248.00 1,011.30 12,216.50 3,004.00 36,288.32 4,840.00 58,467.20 3,721.31 44,953.42 4,309.35 52,056.95 2,560.64 30,932.53 0.00 -30.00 -362.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20,016.60 241,800.52 200.00 Metrado PPTO. 99.01%
01.01.02.03 REFINE Y NIVELACION ZANJA T. SEMIRROCOSO PARA TUB. DN 110-160 PARA TODA m 20,216.60 1.97 39,826.70 0.00 0.00 0.00 0.00 0.00 600.00 1,182.00 1,011.30 1,992.26 3,004.00 5,917.88 4,840.00 9,534.80 3,721.31 7,330.98 4,309.35 8,489.42 2,560.64 5,044.46 0.00 -30.00 -59.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20,016.60 39,432.70 200.00 Metrado PPTO. 99.01%
01.01.02.04 RELLENO COMP. ZANJA (PULSO) T-SEMIRROCOSO - DN 110 A 160mm H=1.01 A 1 m 20,216.60 23.63 477,718.26 0.00 0.00 0.00 0.00 0.00 280.00 6,616.40 0.00 0.00 3,004.00 70,984.52 4,840.00 114,369.20 3,721.31 87,934.56 5,640.65 133,288.56 2,560.64 60,507.92 0.00 -30.00 -708.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20,016.60 472,992.26 200.00 Metrado PPTO.
99.01%
01.01.02.05 ELIMINACION Y ACOMODO DE MATERIAL EXCEDENTE A ZONA ALEDAÑA P/TUBE m 6,110.37 14.50 88,600.37 0.00 0.00 0.00 0.00 0.00 180.00 2,610.00 303.39 4,399.16 901.20 13,067.40 1,452.00 21,054.00 1,491.39 21,625.16 808.73 11,726.59 922.28 13,373.06 0.00 -148.62 -2,154.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,910.37 85,700.38 200.00 Metrado PPTO.
96.73%
01.01.03 SUMINISTRO E INSTALACION DE TUBERIA PVC-U UF, ISO 1452:2011/16422:2012
01.01.03.01 TUBERIA PVC-U, NTP ISO 16422:2012, PN-7.5 DN 160 MM INCL. ANILLO+2% DESP m 4,798.70 39.31 188,636.90 0.00 2,591.30 101,864.00 0.00 2,207.40 86,772.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -200.00 -7,862.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,598.70 180,774.89 200.00 Metrado PPTO. 95.83%
01.01.03.02 TUBERIA H°D° BRIDADA, DN 150 MM, K9 ISO 2531, INCL. ANILLO+2% DESPERDICIO m 151.30 153.89 23,283.56 0.00 151.30 23,283.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 151.30 23,283.56 0.00 Metrado PPTO. 100.00%
01.01.03.03 TUBERIA PVC-U, NTP ISO 16422:2012, PN-10 DN 110 MM INCL. ANILLO+2% DESPE m 11,636.68 21.63 251,701.39 0.00 11,636.68 251,701.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11,636.68 251,701.39 0.00 Metrado PPTO. 100.00%
01.01.03.04 TUBERIA PVC-U, NTP ISO 16422:2012, PN-10 DN 90 MM INCL. ANILLO+2% DESPER m 1,350.00 14.24 19,224.00 0.00 1,350.00 19,224.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,350.00 19,224.00 0.00 Metrado PPTO. 100.00%
01.01.03.05 TUBERIA PVC-U, NTP ISO 1452:2011, PN-10 DN 63 MM INCL. ANILLO+2% DESPERD m 2,431.22 7.08 17,213.04 0.00 2,431.22 17,213.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,431.22 17,213.04 0.00 Metrado PPTO. 100.00%
01.01.03.06 INSTALACION TUBERIA PVC P/AGUA POTAB. DN 160MM m 4,798.70 1.71 8,205.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,530.00 2,616.30 3,000.00 5,130.00 268.70 459.48 0.00 0.00 0.00 0.00 -200.00 -342.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,598.70 7,863.78 200.00 Metrado PPTO. 95.83%
01.01.03.07 INSTALACION TUBERIA H°D° BRIDADA, DN 150 MM m 151.30 1.17 177.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75.65 88.51 71.15 83.25 0.00 4.50 5.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 151.30 177.03 0.00 Metrado PPTO. 100.01%
01.01.03.08 INSTALACION TUBERIA PVC P/AGUA POTAB. DN 110MM m 11,636.68 1.35 15,709.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,596.70 6,205.55 3,742.92 5,052.94 3,177.06 4,289.03 0.00 120.00 162.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11,636.68 15,709.52 0.00 Metrado PPTO. 100.00%
01.01.03.09 INSTALACION TUBERIA PVC P/AGUA POTAB. DN 90MM m 1,350.00 0.99 1,336.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,200.00 1,188.00 150.00 148.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,350.00 1,336.50 0.00 Metrado PPTO. 100.00%
01.01.03.10 INSTALACION TUBERIA PVC P/AGUA POTAB. DN 63MM m 2,431.22 0.96 2,333.97 0.00 0.00 0.00 0.00 0.00 600.00 576.00 1,011.30 970.85 274.00 263.04 545.92 524.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,431.22 2,333.97 0.00 Metrado PPTO. 100.00%
01.01.03.11 PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INC. DESINFECCIÓN) DN 160m m 4,798.70 4.12 19,770.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 800.00 3,296.00 3,000.00 12,360.00 268.70 1,107.04 0.00 0.00 0.00 0.00 530.00 2,183.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,598.70 18,946.64 200.00 Metrado PPTO. 95.83%
01.01.03.12 PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INC. DESINFECCIÓN) DN 150m m 151.30 3.41 515.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 151.30 515.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 151.30 515.93 0.00 Metrado PPTO. 100.00%
01.01.03.13 PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INC. DESINFECCIÓN) DN 110m m 11,636.68 3.28 38,168.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,800.00 12,464.00 5,178.00 16,983.84 0.00 2,658.68 8,720.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11,636.68 38,168.31 0.00 Metrado PPTO. 100.00%
01.01.03.14 PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INC. DESINFECCIÓN) DN 90mm m 1,350.00 3.31 4,468.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 675.00 2,234.25 0.00 0.00 675.00 2,234.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,350.00 4,468.50 0.00 Metrado PPTO. 100.00%
01.01.03.15 PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INC. DESINFECCIÓN) DN 63mm m 2,431.22 3.21 7,804.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,215.61 3,902.11 0.00 0.00 1,215.61 3,902.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,431.22 7,804.22 0.00 Metrado PPTO. 100.00%
01.01.04 SUMINISTRO E INSTALACION DE ACCESORIOS PVC-UF
01.01.04.01 SUMINISTRO CODO/CURVA PVC UF ISO 1452:2011/16422:2012 DN 160 MM 45° I und 128.00 70.60 9,036.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.00 776.60 5.00 353.00 112.00 7,907.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 128.00 9,036.80 0.00 Metrado PPTO. 100.00%
01.01.04.02 SUMINISTRO CODO/CURVA PVC UF ISO 1452:2011/16422:2012 DN 150 MM 45° I und 8.00 70.60 564.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 564.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 564.80 0.00 Metrado PPTO. 100.00%
01.01.04.03 SUMINISTRO CODO/CURVA PVC UF ISO 1452:2011/16422:2012 DN 110 MM 45° I und 310.00 27.03 8,379.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.00 1,351.50 140.00 3,784.20 115.00 3,108.45 0.00 5.00 135.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 310.00 8,379.30 0.00 Metrado PPTO. 100.00%
01.01.04.04 SUMINISTRO CODO/CURVA PVC UF ISO 1452:2011/16422:2012 DN 110 MM 90° I und 15.00 41.12 616.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 328.96 6.00 246.72 0.00 1.00 41.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 616.80 0.00 Metrado PPTO. 100.00%
01.01.04.05 SUMINISTRO CODO/CURVA PVC UF ISO 1452:2011/16422:2012 DN 90 MM 45° IN und 14.00 22.79 319.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 136.74 0.00 0.00 8.00 182.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 319.06 0.00 Metrado PPTO. 100.00%
01.01.04.06 SUMINISTRO CODO/CURVA PVC UF ISO 1452:2011/16422:2012 DN 90 MM 90° IN und 2.00 21.53 43.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 43.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 43.06 0.00 Metrado PPTO. 100.00%
01.01.04.07 SUMINISTRO CODO/CURVA PVC UF ISO 1452:2011/16422:2012 DN 63 MM 45° IN und 25.00 6.38 159.50 0.00 0.00 0.00 0.00 0.00 2.00 12.76 6.00 38.28 4.00 25.52 8.00 51.04 0.00 0.00 5.00 31.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 159.50 0.00 Metrado PPTO. 100.00%
01.01.04.08 SUMINISTRO CODO/CURVA PVC UF ISO 1452:2011/16422:2012 DN 63 MM 90° IN und 1.00 8.36 8.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.36 0.00 Metrado PPTO. 100.00%
01.01.04.09 INSTALAC. DE ACCESORIOS PVC U UR AGUA POTABLE DE 110 - 160 MM und 503.00 10.94 5,502.82 0.00 0.00 0.00 0.00 0.00 2.00 21.88 6.00 65.64 0.00 7.00 76.58 162.00 1,772.28 161.00 1,761.34 159.00 1,739.46 0.00 6.00 65.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 503.00 5,502.82 0.00 Metrado PPTO. 100.00%
01.01.04.10 CONCRETO FC=140 KG/CM2 PARA ANCLAJES DE ACCESORIOS DN 110-160 MM und 503.00 40.39 20,316.17 0.00 0.00 0.00 0.00 0.00 2.00 80.78 6.00 242.34 11.00 444.29 7.00 282.73 151.00 6,098.89 161.00 6,502.79 159.00 6,422.01 0.00 6.00 242.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 503.00 20,316.17 0.00 Metrado PPTO. 100.00%
01.01.05 VALVULA DE AIRE
01.01.05.01 SUMINISTRO DE ACCESORIOS P/CAMARA DE AIRE EN LINEA DE PVC DE 160MM und 12.00 118.14 1,417.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 1,417.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 1,417.68 0.00 Metrado PPTO. 100.00%
01.01.05.02 VÁLVULA DE AIRE DOBLE EFECTO HD DN 50 MM HD PN10. und 1.00 22.80 22.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 22.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 22.80 0.00 Metrado PPTO. 100.00%
RESUMEN DE METRADOS
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
“INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PIURA
OBRA
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88 F.R. =
CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S.
CONTRATISTA CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL
MORROPON HUANCABAMBA (GR)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
RESUMEN DE METRADOS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 SALDO DE
TOTAL METRADO TOTAL METRADO Control de Metrados Porcentaje de
VALORIZADO Avance
VALORIZACIÓN N° 01 VALORIZACIÓN N° 02 VALORIZACIÓN N° 03 VALORIZACIÓN N° 04 VALORIZACIÓN N° 05 VALORIZACIÓN N° 06 VALORIZACIÓN N° 07 VALORIZACIÓN N° 08 VALORIZACIÓN N° 09 VALORIZACIÓN N° 10 VALORIZACIÓN N° 11 VALORIZACIÓN N° 12 VALORIZACIÓN N° 13 VALORIZACIÓN N° 14 VALORIZACIÓN N° 15 VALORIZACIÓN N° 16 VALORIZACIÓN N° 17 VALORIZACIÓN N° 18 VALORIZACIÓN N° 19 VALORIZACIÓN N° 20 PRESUPUESTO
Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/.
01.01.05.03 SUMINISTRO DE ACCESORIOS P/CAMARA DE AIRE EN LINEA DE PVC DE 110 MM und 25.00 110.52 2,763.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 2,763.00 0.00 0.00 -2.00 -221.04 0.00 0.00 0.00 0.00 0.00 0.00 23.00 2,541.96 2.00 Metrado PPTO. 92.00%
01.01.05.04 SUMINISTRO DE ACCESORIOS P/CAMARA DE AIRE EN LINEA DE PVC DE 90 MM und 2.00 109.68 219.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 219.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 219.36 0.00 Metrado PPTO. 100.00%
01.01.05.05 SUMINISTRO DE ACCESORIOS P/CAMARA DE AIRE EN LINEA DE PVC DE 63 MM und 5.00 105.60 528.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 528.00 0.00 0.00 -2.00 -211.20 0.00 0.00 0.00 0.00 0.00 0.00 3.00 316.80 2.00 Metrado PPTO. 60.00%
01.01.05.06 MONTAJE DE VALVULA DE AIRE Ø160 mm A Ø1" E INST. HIDRAULICA und 12.00 152.55 1,830.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 1,525.50 2.00 305.10 0.00 0.00 0.00 0.00 0.00 0.00 12.00 1,830.60 0.00 Metrado PPTO. 100.00%
01.01.05.07 MONTAJE DE VALVULA DE AIRE Ø150 mm A Ø1" E INST. HIDRAULICA und 1.00 152.55 152.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 152.55 0.00 0.00 0.00 0.00 0.00 0.00 1.00 152.55 0.00 Metrado PPTO. 100.00%
01.01.05.08 MONTAJE DE VALVULA DE AIRE Ø110 mm A Ø1" E INST. HIDRAULICA und 25.00 152.55 3,813.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 3,051.00 3.00 457.65 0.00 0.00 0.00 0.00 0.00 0.00 23.00 3,508.65 2.00 Metrado PPTO. 92.00%
01.01.05.09 MONTAJE DE VALVULA DE AIRE Ø90 mm A Ø1" E INST. HIDRAULICA und 2.00 152.55 305.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 305.10 0.00 0.00 0.00 0.00 0.00 0.00 2.00 305.10 0.00 Metrado PPTO. 100.00%
01.01.05.10 MONTAJE DE VALVULA DE AIRE Ø63 mm A Ø1" E INST. HIDRAULICA und 5.00 152.55 762.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 457.65 0.00 0.00 0.00 0.00 0.00 0.00 3.00 457.65 2.00 Metrado PPTO. 60.00%
01.01.05.11 CAMARA P/VALVULA DE AIRE T-NORMAL P/MATRIZ Ø63mm - Ø160mm und 45.00 3,481.40 156,663.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00 104,442.00 12.00 41,776.80 0.00 0.00 0.00 0.00 0.00 0.00 42.00 146,218.80 3.00 Metrado PPTO. 93.33%
01.01.06 VALVULA DE PURGA
01.01.06.01 SUMINISTRO P/VALVULA PURGA P/AGUA POTABLE EN LINEA DE 160mm und 8.00 1,971.56 15,772.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 15,772.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 15,772.48 0.00 Metrado PPTO. 100.00%
01.01.06.02 SUMINISTRO P/VALVULA PURGA P/AGUA POTABLE EN LINEA DE 150mm und 1.00 1,971.56 1,971.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,971.56 0.00 0.00 -1.00 -1,971.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
01.01.06.03 SUMINISTRO P/VALVULA PURGA P/AGUA POTABLE EN LINEA DE 110mm und 18.00 756.54 13,617.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.00 13,617.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.00 13,617.72 0.00 Metrado PPTO. 100.00%
01.01.06.04 SUMINISTRO P/VALVULA PURGA P/AGUA POTABLE EN LINEA DE 90mm und 2.00 561.03 1,122.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,122.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,122.06 0.00 Metrado PPTO. 100.00%
01.01.06.05 SUMINISTRO P/VALVULA PURGA P/AGUA POTABLE EN LINEA DE 63mm und 5.00 559.03 2,795.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 2,795.15 0.00 0.00 -2.00 -1,118.06 0.00 0.00 0.00 0.00 0.00 0.00 3.00 1,677.09 2.00 Metrado PPTO. 60.00%
01.01.06.06 MONTAJE DE VALVULA DE PURGA E INST. HIDRAULICA und 34.00 105.84 3,598.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 2,116.80 11.00 1,164.24 0.00 0.00 0.00 0.00 0.00 0.00 31.00 3,281.04 3.00 Metrado PPTO. 91.18%
01.01.06.07 CAMARA P/VALVULA DE PURGA T-NORMAL P/MATRIZ (DN 63MM-110MM) und 34.00 689.27 23,435.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 13,785.40 11.00 7,581.97 0.00 0.00 0.00 0.00 0.00 0.00 31.00 21,367.37 3.00 Metrado PPTO. 91.18%
01.01.07 CAMARA DISTRIBUIDORA DE CAUDALES
01.01.08 DRENAJE PLUVIAL
01.01.08.01 CRUCE DRENAJE PLUVIAL und 31.00 2,588.20 80,234.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 15,529.20 14.00 36,234.80 8.00 20,705.60 3.00 7,764.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31.00 80,234.20 0.00 Metrado PPTO. 100.00%
01.01.09 CRUCE QUEBRADA SECA
01.01.09.01 CRUCE QUEBRADA SECA und 6.00 9,493.10 56,958.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 28,479.30 0.00 0.00 1.00 9,493.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 37,972.40 2.00 Metrado PPTO. 66.67%
01.01.09.02 MONTAJE DE EQUIPAMIENTO HIDRAULICO P/CAMARAS ROMPE PRESION DE Ø3" A und 1.00 281.89 281.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
01.01.09.03 SUMINISTRO P/CAMARA ROMPE PRESION CRP P/AGUA POTABLE EN LINEA DN 16 und 1.00 4,050.66 4,050.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 4,050.66 0.00 -1.00 -4,050.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
01.01.10 CRUCE AEREO
01.01.10.01 CRUCE AEREO Nº 01
01.01.10.01.01 OBRAS PRELIMINARES
01.01.10.01.01.0 TRAZO, NIVELACION Y REPLANTEO DE CRUCE DE TUBERIA KM 0.04 886.68 35.47 0.00 0.04 35.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -0.04 -35.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 Metrado PPTO. 0.00%
01.01.10.01.02 MOVIMIENTO DE TIERRAS
01.01.10.01.02.0 EXCAVACION TERRENO SEMIRROCOSO HASTA 1.00m PROF m3 40.20 55.27 2,221.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.20 2,221.85 -40.20 -2,221.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.20 Metrado PPTO. 0.00%
01.01.10.01.02.0 REFINE, NIVELACIÓN Y COMPACTACIÓN EN TERRENO SEMIRROCOSO m2 5.00 2.63 13.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 13.15 -5.00 -13.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 Metrado PPTO. 0.00%
01.01.10.01.02.0 RELLENO COMPACTADO EN TERRENO SEMIRROCOSO A PULSO m3 1.50 22.10 33.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.50 33.15 -1.50 -33.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.50 Metrado PPTO. 0.00%
01.01.10.01.02.0 ELIMINACION DE MATERIAL EXCEDENTE A 30 M DE DIST. INCL. ESPONJAMIENT m3 50.25 24.16 1,214.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.25 1,214.04 -50.25 -1,214.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.25 Metrado PPTO. 0.00%
01.01.10.01.03 OBRAS DE CONCRETO
01.01.10.01.03.0 CONCRETO F'C= 100KG/CM2 P/SOLADOS Y/O SUB BASES m3 0.50 332.75 166.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 166.38 -0.50 -166.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 Metrado PPTO. 0.00%
01.01.10.01.03.0 CONCRETO F'C=210 KG/CM2 P/ZAPATAS m3 1.50 425.93 638.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.50 638.90 -1.50 -638.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.50 Metrado PPTO. 0.00%
01.01.10.01.03.0 ACERO ESTRUC. TRABAJADO P/ZAPATA ARMADA (COSTO PROM. INCL. DESPERD kg 37.90 4.18 158.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 37.90 158.42 -37.90 -158.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 37.90 Metrado PPTO. 0.00%
01.01.10.01.03.0 CONCRETO F'C 210 KG/CM2 PARA ANCLAJES Y/O DADOS m3 1.60 449.38 719.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.60 719.01 -1.60 -719.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.60 Metrado PPTO. 0.00%
01.01.10.01.03.0 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA ANCLAJES Y/O DADOS m2 8.00 36.20 289.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 289.60 -8.00 -289.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 Metrado PPTO. 0.00%
01.01.10.01.03.0 ACERO ESTRUC. TRABAJADO P/ANCLAJES Y/O DADOS (COSTO PROM. INCL. DES kg 33.34 4.20 140.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.34 140.03 -33.34 -140.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.34 Metrado PPTO. 0.00%
01.01.10.01.03.0 CONCRETO F'C 210 KG/CM2 PARA COLUMNAS m3 0.54 526.83 284.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.54 284.49 -0.54 -284.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.54 Metrado PPTO. 0.00%
01.01.10.01.03.0 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA COLUMNAS m2 7.20 62.59 450.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.20 450.65 -7.20 -450.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.20 Metrado PPTO. 0.00%
01.01.10.01.03.0 ACERO ESTRUC. TRABAJADO PARA COLUMNAS (COSTO PROM. INCL. DESPERDI kg 61.97 3.81 236.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 61.97 236.11 -61.97 -236.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 61.97 Metrado PPTO. 0.00%
01.01.10.01.04 CARPINTERIA METALICA
01.01.10.01.04.0 SOPORTE Y ANCLAJE DE CABLE PRINCIPAL und 2.00 248.66 497.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 Metrado PPTO. 0.00%
01.01.10.01.04.0 SOPORTE DE TUBERIA DN 100mm CON CABLE DE ACERO und 15.00 221.07 3,316.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 Metrado PPTO. 0.00%
01.01.10.01.04.0 CABLE DE ACERO GALV. Ø1/2" 6X19 TIPO BOA (ALMA DE ACERO) m 50.00 31.28 1,564.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.00 Metrado PPTO. 0.00%
01.01.10.01.04.0 TUBERIA FIE.GALVANIZADO PESADO C-40 4" I/ELEM.UNION+ 2%DESP. ML. 42.00 124.60 5,233.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.00 Metrado PPTO. 0.00%
01.01.10.02 CRUCE AEREO N° 02
01.01.10.02.01 OBRAS PRELIMINARES
01.01.10.02.01.0 TRAZO, NIVELACION Y REPLANTEO DE CRUCE DE TUBERIA KM 0.03 886.68 26.60 0.00 0.03 26.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -0.02 -13.30 0.00 0.00 0.00 0.00 0.00 0.00 0.02 13.30 0.02 Metrado PPTO. 50.00%
01.01.10.02.02 MOVIMIENTO DE TIERRAS
01.01.10.02.02.0 EXCAVACION TERRENO SEMIRROCOSO HASTA 1.00m PROF m3 24.00 55.27 1,326.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.00 1,326.48 0.00 0.00 0.00 0.00 0.00 0.00 24.00 1,326.48 0.00 Metrado PPTO. 100.00%
01.01.10.02.02.0 REFINE, NIVELACIÓN Y COMPACTACIÓN EN TERRENO SEMIRROCOSO m2 5.00 2.63 13.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 13.15 0.00 0.00 0.00 0.00 0.00 0.00 5.00 13.15 0.00 Metrado PPTO. 100.00%
01.01.10.02.02.0 RELLENO COMPACTADO EN TERRENO SEMIRROCOSO A PULSO m3 1.50 22.10 33.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.50 33.15 0.00 0.00 0.00 0.00 0.00 0.00 1.50 33.15 0.00 Metrado PPTO. 100.00%
01.01.10.02.02.0 ELIMINACION DE MATERIAL EXCEDENTE A 30 M DE DIST. INCL. ESPONJAMIENT m3 30.00 24.16 724.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00 724.80 0.00 0.00 0.00 0.00 0.00 0.00 30.00 724.80 0.00 Metrado PPTO. 100.00%
01.01.10.02.03 OBRAS DE CONCRETO
01.01.10.02.03.0 CONCRETO F'C= 100KG/CM2 P/SOLADOS Y/O SUB BASES m3 0.50 332.75 166.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 166.38 0.00 0.00 0.00 0.00 0.00 0.00 0.50 166.38 0.00 Metrado PPTO. 100.00%
01.01.10.02.03.0 CONCRETO F'C=210 KG/CM2 P/ZAPATAS m3 1.50 425.93 638.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.50 638.90 0.00 0.00 0.00 0.00 0.00 0.00 1.50 638.90 0.00 Metrado PPTO. 100.00%
01.01.10.02.03.0 ACERO ESTRUC. TRABAJADO P/ZAPATA ARMADA (COSTO PROM. INCL. DESPERD kg 37.90 4.18 158.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 37.90 158.42 0.00 0.00 0.00 0.00 0.00 0.00 37.90 158.42 0.00 Metrado PPTO. 100.00%
01.01.10.02.03.0 CONCRETO F'C 210 KG/CM2 PARA ANCLAJES Y/O DADOS m3 1.60 449.38 719.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.60 719.01 0.00 0.00 0.00 0.00 0.00 0.00 1.60 719.01 0.00 Metrado PPTO. 100.00%
01.01.10.02.03.0 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA ANCLAJES Y/O DADOS m2 8.00 36.20 289.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 289.60 0.00 0.00 0.00 0.00 0.00 0.00 8.00 289.60 0.00 Metrado PPTO. 100.00%
01.01.10.02.03.0 ACERO ESTRUC. TRABAJADO P/ANCLAJES Y/O DADOS (COSTO PROM. INCL. DES kg 33.34 4.20 140.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.34 140.03 0.00 0.00 0.00 0.00 0.00 0.00 33.34 140.03 0.00 Metrado PPTO. 100.00%
01.01.10.02.03.0 CONCRETO F'C 210 KG/CM2 PARA COLUMNAS m3 0.54 526.83 284.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.54 284.49 0.00 0.00 0.00 0.00 0.00 0.00 0.54 284.49 0.00 Metrado PPTO. 100.00%
01.01.10.02.03.0 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA COLUMNAS m2 7.20 62.59 450.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.20 450.65 0.00 0.00 0.00 0.00 0.00 0.00 7.20 450.65 0.00 Metrado PPTO. 100.00%
01.01.10.02.03.0 ACERO ESTRUC. TRABAJADO PARA COLUMNAS (COSTO PROM. INCL. DESPERDI kg 61.97 3.81 236.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 61.97 236.11 0.00 0.00 0.00 0.00 0.00 0.00 61.97 236.11 0.00 Metrado PPTO. 100.00%
01.01.10.02.04 CARPINTERIA METALICA
01.01.10.02.04.0 SOPORTE Y ANCLAJE DE CABLE PRINCIPAL und 2.00 248.66 497.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 497.32 0.00 0.00 0.00 0.00 0.00 0.00 2.00 497.32 0.00 Metrado PPTO. 100.00%
01.01.10.02.04.0 SOPORTE DE TUBERIA DN 100mm CON CABLE DE ACERO und 9.00 221.07 1,989.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 1,547.49 0.00 0.00 0.00 0.00 0.00 0.00 7.00 1,547.49 2.00 Metrado PPTO. 77.78%
01.01.10.02.04.0 CABLE DE ACERO GALV. Ø1/2" 6X19 TIPO BOA (ALMA DE ACERO) m 35.00 31.28 1,094.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 782.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 782.00 10.00 Metrado PPTO. 71.43%
01.01.10.02.04.0 TUBERIA FIE.GALVANIZADO PESADO C-40 4" I/ELEM.UNION+ 2%DESP. ML. 28.00 124.60 3,488.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 1,869.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 1,869.00 13.00 Metrado PPTO. 53.57%
01.02 ROTURA Y REPOSICION DE PAVIMENTOS
01.02.01 LINEA TRANSVERSAL
01.02.01.01 LEVANTAMIENTO Y REPOSICION DE PAVIMENTO ASFALTO, E=1", INC. ELIMINACI m 70.00 163.08 11,415.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 70.00 11,415.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 70.00 11,415.60 0.00 Metrado PPTO. 100.00%
01.02.01.02 EXCAV. ZANJA (PULSO) P/TUB. TERRENO SEMIRROCOSO DN 110-160mm DE 1.00 m 70.00 54.50 3,815.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 70.00 3,815.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 70.00 3,815.00 0.00 Metrado PPTO. 100.00%
01.02.01.03 ELIMINACION Y ACOMODO DE MATERIAL EXCEDENTE A ZONA ALEDAÑA P/TUBE m 70.00 14.50 1,015.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 70.00 1,015.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 70.00 1,015.00 0.00 Metrado PPTO. 100.00%
01.02.02 LINEA LONGITUDINAL
01.02.02.01 REPOSICION DE PAVIMENTO FLEXIBLE, ESPESOR 1 PULGADA m2 5,054.15 49.50 250,180.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,054.15 Metrado PPTO. 0.00%
01.03 FLETE AGUA POTABLE
01.03.01 FLETE DE TRANSPORTE PIURA - HUANCABAMBA - SONDOR / Línea de Conducción GLB 1.00 56,050.76 56,050.76 0.00 1.00 56,050.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 56,050.76 0.00 Metrado PPTO. 100.00%
01.03.02 FLETE RURAL LINEA DE CONDUCCION GLB 1.00 25,779.13 25,779.13 0.00 0.00 0.00 0.00 0.00 0.50 12,889.57 0.00 0.00 0.00 0.00 0.00 0.25 6,444.78 0.25 6,444.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 25,779.13 0.00 Metrado PPTO. 100.00%
COSTO DIRECTO 2,278,531.18 0.00 481,049.87 0.00 86,772.89 31,905.77 21,051.58 138,214.21 244,300.59 226,553.89 299,494.63 207,580.51 -1,188.07 159,798.59 51,941.63 0.00 0.00 0.00 0.00 0.00 0.00 1,947,476.09
GASTOS GENERALES NO RELACIONADOS CON EL TIEMPO DE EJECUCION DE LA OBRA 1.1469736% 26,134.15 0.00 5,517.52 0.00 995.26 365.95 241.46 1,585.28 2,802.06 2,598.51 3,435.12 2,380.89 -13.63 1,832.85 595.76 0.00 0.00 0.00 0.00 0.00 0.00 22,337.04
(GASTOS FIJOS)
GASTOS GENERALES RELACIONADOS CON EL TIEMPO DE EJECUCION DE LA OBRA 5.1765349% 117,948.96 0.00 24,901.71 0.00 4,491.83 1,651.61 1,089.74 7,154.71 12,646.31 11,727.64 15,503.44 10,745.48 -61.50 8,272.03 2,688.78 0.00 0.00 0.00 0.00 0.00 0.00 100,811.78
(GASTOS VARIABLES)
UTILIDAD 7.00% 159,497.18 0.00 33,673.49 0.00 6,074.10 2,233.40 1,473.61 9,674.99 17,101.04 15,858.77 20,964.62 14,530.64 -83.16 11,185.90 3,635.91 0.00 0.00 0.00 0.00 0.00 0.00 136,323.33
SUB TOTAL 2,582,111.47 0.00 545,142.59 0.00 98,334.08 36,156.73 23,856.39 156,629.19 276,850.00 256,738.81 339,397.81 235,237.52 -1,346.36 181,089.37 58,862.08 0.00 0.00 0.00 0.00 0.00 0.00 2,206,948.24
IGV (18%) 464,780.06 0.00 98,125.67 0.00 17,700.13 6,508.21 4,294.15 28,193.25 49,833.00 46,212.99 61,091.61 42,342.75 -242.34 32,596.09 10,595.17 0.00 0.00 0.00 0.00 0.00 0.00 397,250.68
PRESUPUESTO TOTAL 3,046,891.53 0.00 643,268.26 0.00 116,034.21 42,664.94 28,150.54 184,822.44 326,683.00 302,951.80 400,489.42 277,580.27 -1,588.70 213,685.46 69,457.25 0.00 0.00 0.00 0.00 0.00 0.00 2,604,198.92
“INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PIURA
OBRA
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88 F.R. =
CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S.
CONTRATISTA CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL
MORROPON HUANCABAMBA (GR)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
RESUMEN DE METRADOS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 SALDO DE
TOTAL METRADO TOTAL METRADO Control de Metrados Porcentaje de
VALORIZADO Avance
VALORIZACIÓN N° 01 VALORIZACIÓN N° 02 VALORIZACIÓN N° 03 VALORIZACIÓN N° 04 VALORIZACIÓN N° 05 VALORIZACIÓN N° 06 VALORIZACIÓN N° 07 VALORIZACIÓN N° 08 VALORIZACIÓN N° 09 VALORIZACIÓN N° 10 VALORIZACIÓN N° 11 VALORIZACIÓN N° 12 VALORIZACIÓN N° 13 VALORIZACIÓN N° 14 VALORIZACIÓN N° 15 VALORIZACIÓN N° 16 VALORIZACIÓN N° 17 VALORIZACIÓN N° 18 VALORIZACIÓN N° 19 VALORIZACIÓN N° 20 PRESUPUESTO
Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/.
01203201202.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO SEMIROCOSO A PULSO m2 4.56 2.63 11.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.56 Metrado PPTO. 0.00%
01203201202.03 RELLENO CON MATERIAL PROPIO COMPACTADO m3 1.55 22.10 34.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.55 Metrado PPTO. 0.00%
01203201202.04 ELIMINACION DE MATERIAL EXCEDENTE A 30 M DE DIST. INCL. ESPONJAMIENTO m3 8.32 24.16 201.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.32 Metrado PPTO. 0.00%
01203201203 OBRAS DE CONCRETO
01203201203.01 CONCRETO F'C=100 KG/CM2. PARA SOLADOS Y/O SUB BASES m3 0.25 332.75 83.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.25 Metrado PPTO. 0.00%
01203201203.02 CONCRETO F'C 210 KG/CM2 PARA LOSA DE FONDO DE PISO m3 0.68 442.78 301.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.68 Metrado PPTO. 0.00%
01203201203.03 ACERO ESTRUC. TRABAJADO P/LOSA DE FONDO-BASE DE BUZON, CAMARA, CAJ kg 24.68 4.18 103.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.68 Metrado PPTO. 0.00%
01203201203.04 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADOS m3 2.04 461.17 940.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.04 Metrado PPTO. 0.00%
01203201203.05 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) P/MUROS TIPO CARAVISTA m2 27.72 57.66 1,598.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27.72 Metrado PPTO. 0.00%
01203201203.06 ACERO ESTRUC. TRABAJADO P/MURO REFORZADO (COSTO PROM. INCL. DESPERD kg 282.74 4.29 1,212.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 282.74 Metrado PPTO. 0.00%
01203201203.07 CONCRETO F'C= 210 KG/CM2 P/LOSA MACIZA m3 0.33 446.10 147.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.33 Metrado PPTO. 0.00%
01203201203.08 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) P/LOSA MACIZA m2 3.58 55.52 198.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.58 Metrado PPTO. 0.00%
01203201203.09 ACERO ESTRUCT. TRABAJADO P/LOSA MACIZA (COSTO PROM. INCL. DESPERDICIO kg 24.68 4.17 102.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.68 Metrado PPTO. 0.00%
01203201204 REVOQUES, ENLUCIDOS Y MOLDURAS
01203201204.01 TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO, CAMARAS m2 2.36 36.08 85.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.36 Metrado PPTO. 0.00%
01203201204.02 TARRAJEO CON IMPERMEABILIZANTE DE MUROS EN CAMARAS m2 12.87 50.16 645.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.87 Metrado PPTO. 0.00%
01203201205 CARPINTERIA METALICA Y HERRERIA
01203201205.01 TAPA METALICA -PLANCHA DE ACERO 3/16" m2 0.72 519.01 373.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.72 Metrado PPTO. 0.00%
01203201205.02 ESCALERA DE GATO und 1.84 332.25 611.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.84 Metrado PPTO. 0.00%
01203201205.03 TUB. Fº Gº DE VENTILACION DN 50 mm (c/rejilla de proteccion) und 1.00 151.32 151.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
01203201206 ADITAMENTOS VARIOS
01203201206.01 PROVISION Y COLOCADO DE JUNTA WATER STOP DE P.V.C. e=15CM (6") m 4.55 23.09 105.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.55 Metrado PPTO. 0.00%
01203201207 EQUIPAMIENTO HIDRAULICO
01203201207.01 SUMINISTRO
01203201207.01 ACCESORIOS CAMARA DE DISTRIBUCION LC-03 GLB 1.00 4,141.43 4,141.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
01203201207.02 INSTALACION
01203201207.02 MONTAJE E INSTALACIÓN HIDRÁULICA DE CAMARA DE DISTRIBUCION LC-03 und 1.00 245.12 245.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
COSTO DIRECTO 33,220.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
GASTOS GENERALES NO RELACIONADOS CON EL TIEMPO DE EJECUCION DE LA OBRA 1.1469736% 381.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(GASTOS FIJOS)
GASTOS GENERALES RELACIONADOS CON EL TIEMPO DE EJECUCION DE LA OBRA
(GASTOS VARIABLES) 5.1765349% 1,719.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
UTILIDAD 7.00% 2,325.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SUB TOTAL 37,646.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
IGV (18%) 6,776.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PRESUPUESTO TOTAL 44,423.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
RESUMEN DE METRADOS
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
“INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PIURA
OBRA
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88 F.R. =
CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S.
CONTRATISTA CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL
MORROPON HUANCABAMBA (GR)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
RESUMEN DE METRADOS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 SALDO DE
TOTAL METRADO TOTAL Control de Metrados Porcentaje de
VALORIZADO METRADO Avance
VALORIZACIÓN N° 01 VALORIZACIÓN N° 02 VALORIZACIÓN N° 03 VALORIZACIÓN N° 04 VALORIZACIÓN N° 05 VALORIZACIÓN N° 06 VALORIZACIÓN N° 07 VALORIZACIÓN N° 08 VALORIZACIÓN N° 09 VALORIZACIÓN N° 10 VALORIZACIÓN N° 11 VALORIZACIÓN N° 12 VALORIZACIÓN N° 13 VALORIZACIÓN N° 14 VALORIZACIÓN N° 15 VALORIZACIÓN N° 16 VALORIZACIÓN N° 17 VALORIZACIÓN N° 18 VALORIZACIÓN N° 19 VALORIZACIÓN N° 20 PRESUPUESTO
Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/.
01 PLANTA DE TRATAMIENTO DE AGUA POTABLE SONDOR
01.01 ACONDICIONAMIENTO DE TERRENO PARA PTAP
01.01.01 OBRAS PRELIMINARES
01.01.01.01 LIMPIEZA DE TERRENO DE PTAR m2 1,125.00 1.05 1,181.25 0.00 1,125.00 1,181.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,125.00 1,181.25 0.00 Metrado PPTO. 100.00%
01.01.01.02 LIMPIEZA Y ACONDICIOMIENTO DEL ACCESO A PTAR GLB 1.00 1,918.15 1,918.15 0.00 1.00 1,918.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,918.15 0.00 Metrado PPTO. 100.00%
01.01.01.03 TRAZO Y REPLANTEO INICIALES m2 1,125.00 1.22 1,372.50 0.00 1,125.00 1,372.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,125.00 1,372.50 0.00 Metrado PPTO. 100.00%
01.01.02 MOVIMIENTO DE TIERRA
01.01.02.01 EXCAVACIÓN MASIVA (MAQUINARIA) EN TERRENO SEMI ROCOSO m3 10,125.66 9.94 100,649.06 0.00 1,012.57 10,064.95 9,113.09 90,584.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10,125.66 100,649.06 0.00 Metrado PPTO. 100.00%
01.01.02.02 REFINE, NIVELACIÓN Y COMPACTACIÓN EN TERRENO SEMI ROCOSO m2 1,125.00 2.63 2,958.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 562.50 1,479.38 562.50 1,479.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,125.00 2,958.76 0.00 Metrado PPTO. 100.00%
01.01.02.03 RELLENO COMPACTADO EN TERRENO SEMIROCOSO A PULSO/MAQ. CON MATERIA m3 995.97 13.26 13,206.56 0.00 19.92 264.14 0.00 0.00 0.00 0.00 0.00 497.99 6,603.28 478.07 6,339.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 995.97 13,206.56 0.00 Metrado PPTO. 100.00%
01.01.02.04 ELIMINACION (MAQ) DE MATERIAL EXCENTE DP= 5.00 KM m3 9,129.69 11.99 109,464.98 0.00 912.97 10,946.51 8,216.72 98,518.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,129.69 109,464.98 0.00 Metrado PPTO. 100.00%
01.02 SEDIMENTADOR - DESARENADOR
01.02.01 OBRAS PRELIMINARES
01.02.01.01 TRAZO Y REPLANTEO INICIAL DEL PROYECTO, PARA EDIFICACIÓN CON ESTACIÓN T m2 60.18 1.98 119.16 0.00 60.18 119.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.18 119.16 0.00 Metrado PPTO. 100.00%
01.02.01.02 REPLANTEO FINAL DE LA OBRA CON ESTACIÓN TOTAL m2 60.18 0.62 37.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.18 37.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.18 37.31 0.00 Metrado PPTO. 100.00%
01.02.01.03 TRANSPORTE DE MATERIALES, HER-EQUIPOS EN ZONA SIN ACCESO VEHICULAR P GLB 1.00 1,283.18 1,283.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.30 384.95 0.30 384.95 0.20 256.64 0.20 256.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,283.18 0.00 Metrado PPTO. 100.00%
01.02.02 MOVIMIENTO DE TIERRAS
01.02.02.01 EXCAVACIONES TERRENO SEMI ROCOSO C/EQUIPO, HASTA 3.00 M PROF.(SIN EM m3 100.28 79.76 7,998.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.28 7,998.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.28 7,998.33 0.00 Metrado PPTO. 100.00%
01.02.02.02 REFINE, NIVELACIÓN Y COMPACTACIÓN EN TERRENO SEMI ROCOSO m2 60.18 2.63 158.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.18 158.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.18 158.27 0.00 Metrado PPTO. 100.00%
01.02.02.03 RELLENO COMPACTADO EN TERRENO SEMIROCOSO A PULSO, CON MATERIAL PRO m3 3.29 22.10 72.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.29 72.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.29 72.71 0.00 Metrado PPTO. 100.00%
01.02.02.04 RELLENO COMPACTADO CON MATERIAL DE PRÉSTAMO AFIRMADO (INCL. PROVISI m3 8.51 119.06 1,013.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.51 1,013.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.51 1,013.20 0.00 Metrado PPTO. 100.00%
01.02.02.05 RELLENO COMPACTADO MANUAL CON MATERIAL MEZCLA COMPACTADA (OVER m3 11.34 119.55 1,355.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.34 1,355.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.34 1,355.70 0.00 Metrado PPTO. 100.00%
01.02.02.06 ELIMINACION (MAQ) DE MATERIAL EXCENTE DP= 5.00 KM m3 125.36 11.99 1,503.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 125.36 1,503.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 125.36 1,503.07 0.00 Metrado PPTO. 100.00%
01.02.03 OBRAS DE CONCRETO SIMPLE
01.02.03.01 CONCRETO F'C= 100KG/CM2 P/SOLADOS Y/O SUB BASES m3 2.84 332.75 945.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.84 945.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.84 945.01 0.00 Metrado PPTO. 100.00%
01.02.04 OBRAS DE CONCRETO ARMADO
01.02.04.01 CONCRETO F'C=210 KG/CM2 P/LOSA DE FONDO-PISO m3 11.25 442.78 4,981.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.47 4,635.91 0.00 0.00 0.78 345.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.25 4,981.28 0.00 Metrado PPTO. 100.00%
01.02.04.02 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA LOSAS MACIZAS m2 20.94 55.52 1,162.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.40 521.89 0.00 0.00 11.54 640.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.94 1,162.59 0.00 Metrado PPTO. 100.00%
01.02.04.03 ACERO ESTRUC. TRABAJADO P/LOSA DE FONDO (COSTO PROM. INCL. DESPERDICIO kg 2,043.09 4.18 8,540.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,745.15 7,294.73 0.00 0.00 297.94 1,245.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,043.09 8,540.12 0.00 Metrado PPTO. 100.00%
01.02.04.04 CONCRETO F'C= 210 KG/CM2 P/MUROS REFORZADOS m3 17.56 461.17 8,098.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.69 1,240.55 14.14 6,520.94 0.00 0.73 336.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.56 8,098.14 0.00 Metrado PPTO. 100.00%
01.02.04.05 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA MUROS RECTOS m2 181.45 57.66 10,462.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.90 1,551.05 141.38 8,151.97 0.00 13.17 759.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 181.45 10,462.40 0.00 Metrado PPTO. 100.00%
01.02.04.06 ACERO ESTRUC. TRABAJADO P/MURO (COSTO PROM. INCL. DESPERDICIOS) kg 1,264.13 4.29 5,423.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,113.64 4,777.52 0.00 0.00 41.00 175.89 109.49 469.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,264.13 5,423.12 0.00 Metrado PPTO. 100.00%
01.02.05 REVOQUES, ENLUCIDOS Y MOLDURAS
01.02.05.01 TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO, CANALES m2 71.51 31.66 2,264.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 71.51 2,264.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 71.51 2,264.01 0.00 Metrado PPTO. 100.00%
01.02.05.02 TARRAJEO CON IMPERMEABILIZANTE DE MUROS EN CÁMARAS m2 181.87 46.94 8,536.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 165.00 7,745.10 16.87 791.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 181.87 8,536.98 0.00 Metrado PPTO. 100.00%
01.02.06 CARPINTERIA METALICA Y HERRERIA
01.02.06.01 BARANDA DE TUBO FO. GDO. PASAMANO 2"-PARANTE 1" X 1M.ALT ml 30.26 41.74 1,263.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.26 1,263.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.26 1,263.05 0.00 Metrado PPTO. 100.00%
01.02.06.02 TAPA METALICA SANITARIA C/PLANCHA ESTRIADA DE ACERO E=3/16" m2 1.55 350.75 543.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.55 543.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.55 543.66 0.00 Metrado PPTO. 100.00%
01.02.07 ADITAMENTOS VARIOS
01.02.07.01 PROVISION Y COLOCACION DE JUNTA WATER STOP DE PVC E=6" m 43.20 22.20 959.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43.20 959.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43.20 959.04 0.00 Metrado PPTO. 100.00%
01.02.07.02 PANTALLA DIFUSORA DE POLIETILENO e=0.05 m CON 63 ORIFICIOS DE Ø 25mm, S und 1.00 841.89 841.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 841.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 841.89 0.00 Metrado PPTO. 100.00%
01.02.07.03 VEREDA DE CONCRETO F'C=175 KG/CM2, E=0.10 M PASTA 1:2 C/EMPLEO DE MEZ m2 27.88 81.68 2,277.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27.88 2,277.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27.88 2,277.24 0.00 Metrado PPTO. 100.00%
01.02.07.04 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA ANCLAJES Y/O DADOS m2 8.60 39.16 336.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.60 336.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.60 336.78 0.00 Metrado PPTO. 100.00%
01.02.08 EQUIPAMIENTO HIDRAULICO SEDIMENTADOR
01.02.08.01 TUBERIA PVC-U, NTP ISO 1452:2011/16422:2012 PN-10 DN 110MM_x000D_ m 5.00 22.25 111.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 111.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 111.25 0.00 Metrado PPTO. 100.00%
01.02.08.02 UNION DE AMPLIO RAMGO DN 100 MM HD PN 10 und 1.00 210.00 210.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 210.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 210.00 0.00 Metrado PPTO. 100.00%
01.02.08.03 TUBERIA DE HºDº, BRIDADA Ø 4" m 6.00 189.00 1,134.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 1,134.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 1,134.00 0.00 Metrado PPTO. 100.00%
01.02.08.04 CODO Ø 4" H°D° BRIDADA_x000D_ und 6.00 320.00 1,920.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 1,920.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 1,920.00 0.00 Metrado PPTO. 100.00%
01.02.08.05 BRIDA ROMPE AGUA Ø 4" Hº Dº"_x000D_ und 3.00 322.03 966.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 966.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 966.09 0.00 Metrado PPTO. 100.00%
01.02.08.06 TUBERIA DE HºDº, BRIDADA Ø 6" m 5.00 220.50 1,102.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 1,102.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 1,102.50 0.00 Metrado PPTO. 100.00%
01.02.08.07 BRIDA ROMPE AGUA Ø 6" Hº Dº_x000D_ und 5.00 480.00 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 2,400.00 0.00 Metrado PPTO. 100.00%
01.02.08.08 NIPLE Hº Dº BRIDADA DE 4"_x000D_ und 1.00 56.00 56.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 56.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 56.00 0.00 Metrado PPTO. 100.00%
01.02.08.09 VALVULA Hº Dº BRIDADA DE 6"_x000D_ und 1.00 725.00 725.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 725.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 725.00 0.00 Metrado PPTO. 100.00%
01.02.08.10 NIPLE Hº Dº BRIDADA DE 6"_x000D_ und 2.00 89.00 178.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 178.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 178.00 0.00 Metrado PPTO. 100.00%
01.02.08.11 INSTALACION
01.02.08.11.01 MONTAJE DE INSTALACIÓN HIDRÁULICA DE SEDIMENTADOR GLB 1.00 1,197.44 1,197.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,197.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,197.44 0.00 Metrado PPTO. 100.00%
01.03 PRE-FILTRO
01.03.01 OBRAS PRELIMINARES
01.03.01.01 TRAZO Y REPLANTEO INICIAL DEL PROYECTO, PARA EDIFICACIÓN CON ESTACIÓN T m2 171.60 1.98 339.77 0.00 171.60 339.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 171.60 339.77 0.00 Metrado PPTO. 100.00%
01.03.01.02 REPLANTEO FINAL DE LA OBRA CON ESTACIÓN TOTAL m2 171.60 0.62 106.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 171.60 106.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 171.60 106.39 0.00 Metrado PPTO. 100.00%
01.03.01.03 TRANSPORTE DE MATERIALES, HER-EQUIPOS EN ZONA SIN ACCESO VEHICULAR P/P GLB 1.00 1,293.77 1,293.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 646.89 0.30 388.13 0.20 258.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,293.77 0.00 Metrado PPTO. 100.00%
01.03.02 MOVIMIENTO DE TIERRAS
01.03.02.01 EXCAVACIONES TERRENO SEMI ROCOSO C/EQUIPO, HASTA 3.00 M PROF.(SIN EM m3 528.76 79.76 42,173.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 528.76 42,173.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 528.76 42,173.90 0.00 Metrado PPTO. 100.00%
01.03.02.02 REFINE, NIVELACIÓN Y COMPACTACIÓN EN TERRENO SEMI ROCOSO m2 176.34 2.63 463.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 176.34 463.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 176.34 463.77 0.00 Metrado PPTO. 100.00%
01.03.02.03 RELLENO COMPACTADO EN TERRENO SEMIROCOSO A PULSO, CON MATERIAL PRO m3 4.36 22.10 96.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.36 96.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.36 96.36 0.00 Metrado PPTO. 100.00%
01.03.02.04 RELLENO COMPACTADO CON MATERIAL DE PRÉSTAMO AFIRMADO (INCL. PROVISI m3 26.07 119.06 3,103.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.07 3,103.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.07 3,103.89 0.00 Metrado PPTO. 100.00%
01.03.02.05 RELLENO COMPACTADO MANUAL CON MATERIAL MEZCLA COMPACTADA (OVER m3 34.76 119.55 4,155.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.76 4,155.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.76 4,155.56 0.00 Metrado PPTO. 100.00%
01.03.02.06 ELIMINACION (MAQ) DE MATERIAL EXCENTE DP= 5.00 KM m3 660.95 11.99 7,924.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 660.95 7,924.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 660.95 7,924.79 0.00 Metrado PPTO. 100.00%
01.03.03 OBRAS DE CONCRETO SIMPLE
01.03.03.01 CONCRETO F'C= 100KG/CM2 P/SOLADOS Y/O SUB BASES m3 8.85 332.75 2,944.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.85 2,944.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.85 2,944.84 0.00 Metrado PPTO. 100.00%
01.03.04 OBRAS DE CONCRETO
01.03.04.01 CONCRETO F'C=210 KG/CM2 P/LOSA DE FONDO-PISO m3 50.69 442.78 22,444.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.98 22,130.14 0.71 314.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.69 22,444.51 0.00 Metrado PPTO. 100.00%
01.03.04.02 ENCOFRADO (I/HABILITACIÓN DE MADERA) P/LOSAS DE FONDO-BASE DE BUZÓN, m2 53.54 46.30 2,478.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 53.54 2,478.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 53.54 2,478.90 0.00 Metrado PPTO. 100.00%
01.03.04.03 ACERO ESTRUC. TRABAJADO P/LOSA DE FONDO (COSTO PROM. INCL. DESPERDICIO kg 5,448.20 4.18 22,773.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,331.94 22,287.51 116.26 485.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,448.20 22,773.48 0.00 Metrado PPTO. 100.00%
01.03.04.04 CONCRETO F'C= 175 KG/CM2 P/RELLENO-TALUD m3 6.56 486.78 3,193.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.56 3,193.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.56 3,193.28 0.00 Metrado PPTO. 100.00%
01.03.04.05 CONCRETO F'C= 210 KG/CM2 P/MUROS REFORZADOS m3 63.15 461.17 29,122.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.91 19,327.63 21.24 9,795.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 63.15 29,122.88 0.00 Metrado PPTO. 100.00%
01.03.04.06 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA MUROS TIPO CARAVISTA m2 157.63 75.11 11,839.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 151.45 11,375.41 6.18 464.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 157.63 11,839.59 0.00 Metrado PPTO. 100.00%
01.03.04.07 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA MUROS RECTOS m2 393.67 57.66 22,699.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 388.27 22,387.65 5.40 311.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 393.67 22,699.01 0.00 Metrado PPTO. 100.00%
01.03.04.08 ACERO ESTRUC. TRABAJADO P/MURO (COSTO PROM. INCL. DESPERDICIOS) kg 4,938.16 4.29 21,184.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,862.09 20,858.37 76.07 326.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,938.16 21,184.71 0.00 Metrado PPTO. 100.00%
01.03.04.09 CONCRETO F'C= 210 KG/CM2 PARA VIGAS m3 27.20 446.10 12,133.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.60 6,066.96 13.60 6,066.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27.20 12,133.92 0.00 Metrado PPTO. 100.00%
01.03.04.10 ENCOFRADO (INC. HABILITACION DE MADERA)P/VIGAS RECTAS Y DINTELES m2 54.40 72.73 3,956.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27.20 1,978.26 27.20 1,978.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.40 3,956.52 0.00 Metrado PPTO. 100.00%
01.03.04.11 ACERO ESTRUC. TRABAJADO P/VIGAS Y DINTELES (COSTO PROM. INCL. DESPERDIC kg 328.62 4.18 1,373.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 285.82 1,194.73 42.80 178.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 328.62 1,373.63 0.00 Metrado PPTO. 100.00%
01.03.04.12 CONCRETO F'C=210 KG/CM2 EN LOSAS MACIZAS m3 6.62 446.10 2,953.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.62 2,953.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.62 2,953.18 0.00 Metrado PPTO. 100.00%
01.03.04.13 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA LOSAS MACIZAS m2 76.86 55.52 4,267.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 76.86 4,267.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 76.86 4,267.27 0.00 Metrado PPTO. 100.00%
01.03.04.14 ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIO kg 450.85 4.17 1,880.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 450.85 1,880.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 450.85 1,880.04 0.00 Metrado PPTO. 100.00%
01.03.05 MUROS Y TABIQUES DE ALBAÑILERIA
01.03.05.01 MURO DE CANTO LADRILLO KING-KONG CON CEMENTO-ARENA m2 97.92 41.75 4,088.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 97.92 4,088.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 97.92 4,088.16 0.00 Metrado PPTO. 100.00%
01.03.06 REVOQUES, ENLUCIDOS Y MOLDURAS
01.03.06.01 TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO, CANALES m2 167.23 31.66 5,294.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 167.23 5,294.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 167.23 5,294.50 0.00 Metrado PPTO. 100.00%
01.03.06.02 TARRAJEO CON IMPERMEABILIZANTE DE MUROS EN CÁMARAS m2 399.11 46.94 18,734.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 356.97 16,756.17 42.14 1,978.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 399.11 18,734.22 0.00 Metrado PPTO. 100.00%
01.03.07 CARPINTERIA METALICA Y HERRERIA
01.03.07.01 BARANDA DE TUBO FO. GDO. PASAMANO 2"-PARANTE 1" X 1M.ALT ml 52.00 41.74 2,170.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52.00 2,170.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52.00 2,170.48 0.00 Metrado PPTO. 100.00%
01.03.07.02 ESCALERA GATO EMPOTRADA DE ALUMINIO m 3.20 80.92 258.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.20 258.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.20 258.94 0.00 Metrado PPTO. 100.00%
01.03.07.03 COMPUERTA DE MADERA TRATADA 0.55 x 0.65m INCL. ACCESORIOS P/INSTALACI und 2.00 147.34 294.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 294.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 294.68 0.00 Metrado PPTO. 100.00%
01.03.07.04 COMPUERTA DE MADERA TRATADA 0.30 x 0.60m INCL. ACCESORIOS P/INSTALACI und 1.00 178.44 178.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 178.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 178.44 0.00 Metrado PPTO. 100.00%
01.03.08 ADITAMENTOS VARIOS
01.03.08.01 LOSAS PREFABRICADAS (0.50 m x 0.30 m) und 132.00 79.41 10,482.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.00 10,482.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.00 10,482.12 0.00 Metrado PPTO. 100.00%
01.03.08.02 LOSAS PREFABRICADAS (1.10 m x 0.60 m) und 17.00 286.40 4,868.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.00 4,868.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.00 4,868.80 0.00 Metrado PPTO. 100.00%
01.03.08.03 GRAVA P/FILTRO (PROV. Y COLOC) SEGUN ESPECIFICACIONES m3 263.30 131.27 34,563.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 263.30 34,563.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 263.30 34,563.39 0.00 Metrado PPTO. 100.00%
01.03.08.04 VEREDA DE CONCRETO F'C=175 KG/CM2, E=0.10 M PASTA 1:2 C/EMPLEO DE MEZ m2 34.26 81.68 2,798.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.42 769.43 24.84 2,028.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.26 2,798.36 0.00 Metrado PPTO. 100.00%
01.03.08.05 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA ANCLAJES Y/O DADOS m2 11.42 39.16 447.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.28 245.92 5.14 201.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.42 447.20 0.00 Metrado PPTO. 100.00%
01.03.09 EQUIPAMIENTO HIDRAULICO PREFILTRO
01.03.09.01 TUBERIA DE HºDº, BRIDADA Ø 6" m 18.00 220.50 3,969.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.00 3,969.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.00 3,969.00 0.00 Metrado PPTO. 100.00%
01.03.09.02 BRIDA ROMPE AGUA Ø 6" Hº Dº_x000D_ und 2.00 480.00 960.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 960.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 960.00 0.00 Metrado PPTO. 100.00%
01.03.09.03 VALVULA Hº Dº BRIDADA DE 6"_x000D_ und 1.00 725.00 725.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 725.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 725.00 0.00 Metrado PPTO. 100.00%
01.03.09.04 ABRAZADERA Hº Dº DE Ø 6" und 4.00 68.00 272.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 272.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 272.00 0.00 Metrado PPTO. 100.00%
01.03.09.05 TUBERIA DE HºDº, BRIDADA Ø 4" m 4.00 189.00 756.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 756.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 756.00 0.00 Metrado PPTO. 100.00%
01.03.09.06 CODO Ø 4" H°D° BRIDADA_x000D_ und 8.00 320.00 2,560.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 2,560.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 2,560.00 0.00 Metrado PPTO. 100.00%
01.03.09.07 NIPLE Hº Dº BRIDADA DE 4"_x000D_ und 8.00 56.00 448.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 448.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 448.00 0.00 Metrado PPTO. 100.00%
01.03.09.08 BRIDA ROMPE AGUA Ø 4" Hº Dº"_x000D_ und 8.00 322.03 2,576.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 2,576.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 2,576.24 0.00 Metrado PPTO. 100.00%
01.03.09.09 VALVULA Hº Dº BRIDADA DE 4"_x000D_ und 8.00 415.25 3,322.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 3,322.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 3,322.00 0.00 Metrado PPTO. 100.00%
01.03.09.10 INSTALACION
01.03.09.10.01 MONTAJE DE INSTALACIÓN HIDRÁULICA DE PRE FILTRO GLB 1.00 684.25 684.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 684.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 684.25 0.00 Metrado PPTO. 100.00%
01.04 FILTRO LENTO
01.04.01 OBRAS PRELIMINARES
01.04.01.01 TRAZO Y REPLANTEO INICIAL DEL PROYECTO, PARA EDIFICACIÓN CON ESTACIÓN T m2 125.88 1.98 249.24 0.00 125.88 249.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 125.88 249.24 0.00 Metrado PPTO. 100.00%
01.04.01.02 REPLANTEO FINAL DE LA OBRA CON ESTACIÓN TOTAL m2 125.88 0.62 78.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 125.88 78.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 125.88 78.05 0.00 Metrado PPTO. 100.00%
01.04.01.03 TRANSPORTE DE MATERIALES, HER-EQUIPOS EN ZONA SIN ACCESO VEHICULAR P/F GLB 1.00 1,168.84 1,168.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,168.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,168.84 0.00 Metrado PPTO. 100.00%
01.04.02 MOVIMIENTO DE TIERRAS
01.04.02.01 EXCAVACIONES TERRENO SEMI ROCOSO C/EQUIPO, HASTA 3.00 M PROF.(SIN EM m3 478.05 79.76 38,129.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 445.52 35,534.68 32.53 2,594.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 478.05 38,129.27 0.00 Metrado PPTO. 100.00%
01.04.02.02 REFINE, NIVELACIÓN Y COMPACTACIÓN EN TERRENO SEMI ROCOSO m2 125.08 2.63 328.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 112.32 295.40 12.76 33.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 125.08 328.96 0.00 Metrado PPTO. 100.00%
01.04.02.03 RELLENO COMPACTADO EN TERRENO SEMIROCOSO A PULSO, CON MATERIAL PRO m3 46.59 22.10 1,029.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.74 988.75 1.85 40.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 46.59 1,029.64 0.00 Metrado PPTO. 100.00%
01.04.02.04 RELLENO Y COMPACTADO CON MATERIAL HORMIGON m3 25.02 122.95 3,076.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.46 2,761.46 2.56 314.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.02 3,076.21 0.00 Metrado PPTO. 100.00%
01.04.02.05 RELLENO COMPACTADO CON MATERIAL DE PRÉSTAMO AFIRMADO (INCL. PROVISI m3 25.02 119.06 2,978.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.46 2,674.09 2.56 304.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.02 2,978.88 0.00 Metrado PPTO. 100.00%
01.04.02.06 ELIMINACION (MAQ) DE MATERIAL EXCENTE DP= 5.00 KM m3 597.57 11.99 7,164.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 557.40 6,683.23 40.17 481.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 597.57 7,164.87 0.00 Metrado PPTO. 100.00%
01.04.03 OBRAS DE CONCRETO SIMPLE
01.04.03.01 CONCRETO F'C= 100KG/CM2 P/SOLADOS Y/O SUB BASES m3 12.51 332.75 4,162.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.23 3,736.78 1.28 425.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.51 4,162.70 0.00 Metrado PPTO. 100.00%
01.04.04 OBRAS DE CONCRETO ARMADO
01.04.04.01 CONCRETO F'C=210 KG/CM2 P/LOSA DE FONDO-PISO m3 35.82 442.78 15,860.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.97 15,485.68 0.85 374.15 0.00125 0.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35.82 15,860.38 0.00 Metrado PPTO. 100.00%
01.04.04.02 ACERO ESTRUC. TRABAJADO P/LOSA DE FONDO (COSTO PROM. INCL. DESPERDICIO kg 2,278.70 4.18 9,524.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,248.69 9,399.51 30.01 125.44 0.004 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,278.70 9,524.97 0.00 Metrado PPTO. 100.00%
01.04.04.03 CONCRETO F'C= 210 KG/CM2 P/MUROS REFORZADOS m3 50.29 461.17 23,192.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 48.59 22,409.98 1.70 781.68 0.00125 0.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.29 23,192.24 0.00 Metrado PPTO. 100.00%
01.04.04.04 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA MUROS TIPO CARAVISTA m2 170.76 75.11 12,825.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 159.90 12,010.39 10.86 815.32 0.001 0.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 170.76 12,825.79 0.00 Metrado PPTO. 100.00%
01.04.04.05 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA MUROS RECTOS m2 264.63 57.66 15,258.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 241.63 13,932.33 23.00 1,326.18 0.001 0.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 264.63 15,258.57 0.00 Metrado PPTO. 100.00%
01.04.04.06 ACERO ESTRUC. TRABAJADO P/MURO (COSTO PROM. INCL. DESPERDICIOS) kg 4,647.35 4.29 19,937.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,193.59 17,990.50 453.76 1,946.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,647.35 19,937.13 0.00 Metrado PPTO. 100.00%
01.04.04.07 CONCRETO F'C=210 KG/CM2 EN LOSAS MACIZAS m3 5.09 446.10 2,270.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.41 1,075.10 2.68 1,195.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.09 2,270.65 0.00 Metrado PPTO. 100.00%
01.04.04.08 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA LOSAS MACIZAS m2 30.55 55.52 1,696.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.35 907.75 14.20 788.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.55 1,696.13 0.00 Metrado PPTO. 100.00%
01.04.04.09 ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIO kg 455.69 4.17 1,900.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 227.85 950.11 227.85 950.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 455.69 1,900.22 0.00 Metrado PPTO. 100.00%
01.04.05 REVOQUES, ENLUCIDOS Y MOLDURAS
01.04.05.01 TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO, CANALES m2 93.93 31.66 2,973.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 93.93 2,973.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 93.93 2,973.82 0.00 Metrado PPTO. 100.00%
01.04.05.02 TARRAJEO CON IMPERMEABILIZANTE DE MUROS EN CÁMARAS m2 264.63 46.94 12,421.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 264.63 12,421.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 264.63 12,421.73 0.00 Metrado PPTO. 100.00%
01.04.06 CARPINTERIA METALICA Y HERRERIA
01.04.06.01 COMPUERTAS TIPO MARIPOSA PARA ELIMINACION DE AGUA DE LIMPIEZA DE FILT und 2.00 417.01 834.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 834.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 834.02 0.00 Metrado PPTO. 100.00%
01.04.06.02 COMPUERTAS DE ACERO INOXIDABLE TIPO PLANCHA 0.18 M x 0.25 M VASTAGO L und 3.00 349.32 1,047.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 1,047.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 1,047.96 0.00 Metrado PPTO. 100.00%
01.04.06.03 TAPA METALICA TIPO 4, SANITARIA C/PLANCHA ESTRIADA DE ACERO E=3/16" und 4.00 633.29 2,533.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 2,533.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 2,533.16 0.00 Metrado PPTO. 100.00%
01.04.06.04 TAPA METALICA TIPO 5, SANITARIA C/PLANCHA ESTRIADA DE ACERO E=3/16" und 1.00 667.21 667.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 667.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 667.21 0.00 Metrado PPTO. 100.00%
01.04.06.05 BARANDA DE TUBO FO. GDO. PASAMANO 2"-PARANTE 1" X 1M.ALT ml 39.80 41.74 1,661.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.80 1,661.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.80 1,661.25 0.00 Metrado PPTO. 100.00%
01.04.06.06 VERTEDERO TRIANGULAR 90º 0.40 x 0.25m DE ACERO INOXIDABLE (SUMINISTRO und 1.00 246.03 246.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 246.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 246.03 0.00 Metrado PPTO. 100.00%
01.04.06.07 TARJETA E=1" 0.60 x 0.55 m PVC (Suministro e instalacion) und 1.00 313.63 313.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 313.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 313.63 0.00 Metrado PPTO. 100.00%
01.04.06.08 TARJETA E=1" 0.65 x 0.55 m PVC (Suministro e instalacion) und 3.00 313.63 940.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 940.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 940.89 0.00 Metrado PPTO. 100.00%
01.04.07 MATERIAL FILTRANTE
01.04.07.01 GRAVA P/FILTRO (PROV. Y COLOC) SEGUN ESPECIFICACIONES m3 26.95 131.27 3,537.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.95 3,537.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.95 3,537.73 0.00 Metrado PPTO. 100.00%
01.04.07.02 LECHO DE ARENA (PROV. Y COLOC) SEGUN ESPECIFICACIONES m3 69.30 120.77 8,369.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 69.30 8,369.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 69.30 8,369.36 0.00 Metrado PPTO. 100.00%
01.04.08 MANPOSTERIA
01.04.08.01 LADRILLO MACIZO/ARCILLA 9X14X24 P/FILTRO und 3,260.00 1.54 5,020.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,260.00 5,020.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,260.00 5,020.40 0.00 Metrado PPTO. 100.00%
01.04.08.02 MURO DE CANTO LADRILLO KING-KONG CON CEMENTO-ARENA m2 71.62 41.75 2,990.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 71.62 2,990.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 71.62 2,990.14 0.00 Metrado PPTO. 100.00%
01.04.09 ADITAMENTOS VARIOS
01.04.09.01 PROVISION Y COLOCACION DE JUNTA WATER STOP DE PVC E=6" m 64.60 22.20 1,434.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.60 1,434.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.60 1,434.12 0.00 Metrado PPTO. 100.00%
01.04.09.02 VEREDA DE CONCRETO F'C=175 KG/CM2, E=0.10 M PASTA 1:2 C/EMPLEO DE MEZ m2 30.13 81.68 2,461.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.07 1,230.51 15.07 1,230.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.13 2,461.02 0.00 Metrado PPTO. 100.00%
01.04.09.03 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA ANCLAJES Y/O DADOS m2 10.04 39.16 393.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.02 196.58 5.02 196.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.04 393.16 0.00 Metrado PPTO. 100.00%
01.04.10 EQUIPAMIENTO HIDRAULICO SEDIMENTADOR
01.04.10.01 TUBERIA DE HºDº, BRIDADA Ø 6" m 4.00 220.50 882.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 882.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 882.00 0.00 Metrado PPTO. 100.00%
01.04.10.02 BRIDA ROMPE AGUA Ø 6" Hº Dº_x000D_ und 2.00 480.00 960.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 960.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 960.00 0.00 Metrado PPTO. 100.00%
01.04.10.03 VALVULA Hº Dº BRIDADA DE 6"_x000D_ und 2.00 725.00 1,450.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,450.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,450.00 0.00 Metrado PPTO. 100.00%
01.04.10.04 TUBERIA DE HºDº, BRIDADA Ø 4" m 7.00 189.00 1,323.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 1,323.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 1,323.00 0.00 Metrado PPTO. 100.00%
01.04.10.05 BRIDA ROMPE AGUA Ø 4" Hº Dº"_x000D_ und 6.00 322.03 1,932.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 1,932.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 1,932.18 0.00 Metrado PPTO. 100.00%
01.04.10.06 VALVULA Hº Dº BRIDADA DE 4"_x000D_ und 5.00 415.25 2,076.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 2,076.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 2,076.25 0.00 Metrado PPTO. 100.00%
01.04.10.07 CODO Ø 4" H°D° BRIDADA_x000D_ und 2.00 320.00 640.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 640.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 640.00 0.00 Metrado PPTO. 100.00%
01.04.10.08 NIPLE Hº Dº BRIDADA DE 4"_x000D_ und 4.00 56.00 224.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 224.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 224.00 0.00 Metrado PPTO. 100.00%
RESUMEN DE METRADOS
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
“INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PIURA
OBRA
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88 F.R. =
CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S.
CONTRATISTA CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL
MORROPON HUANCABAMBA (GR)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
RESUMEN DE METRADOS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 TOTAL METRADO SALDO DE Porcentaje de
VALORIZADO TOTAL METRADO Control de Metrados Avance
VALORIZACIÓN N° 01 VALORIZACIÓN N° 02 VALORIZACIÓN N° 03 VALORIZACIÓN N° 04 VALORIZACIÓN N° 05 VALORIZACIÓN N° 06 VALORIZACIÓN N° 07 VALORIZACIÓN N° 08 VALORIZACIÓN N° 09 VALORIZACIÓN N° 10 VALORIZACIÓN N° 11 VALORIZACIÓN N° 12 VALORIZACIÓN N° 13 VALORIZACIÓN N° 14 VALORIZACIÓN N° 15 VALORIZACIÓN N° 16 VALORIZACIÓN N° 17 VALORIZACIÓN N° 18 VALORIZACIÓN N° 19 VALORIZACIÓN N° 20 PRESUPUESTO
Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/.
01.04.10.09 INSTALACION
01.04.10.09.01 MONTAJE DE INSTALACIÓN HIDRÁULICA DE FILTRO LENTO GLB 1.00 684.25 684.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 684.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 684.25 0.00 Metrado PPTO. 100.00%
01.05 CAMARA DE CONTACTO Y TANQUE DE CLORACIÓN_x000D_
01.05.01 OBRAS PRELIMINARES
01.05.01.01 TRAZO Y REPLANTEO INICIAL DEL PROYECTO, PARA EDIFICACIÓN CON ESTACIÓN T m2 11.51 1.98 22.79 0.00 11.51 22.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.51 22.79 0.00 Metrado PPTO. 100.00%
01.05.01.02 REPLANTEO FINAL DE LA OBRA CON ESTACIÓN TOTAL m2 11.51 0.62 7.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.51 7.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.51 7.14 0.00 Metrado PPTO. 100.00%
01.05.01.03 TRANSPORTE DE MATERIALES, HER-EQUIPOS EN ZONA SIN ACCESO VEHICULAR GLB 1.00 1,016.38 1,016.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,016.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,016.38 0.00 Metrado PPTO. 100.00%
01.05.02 MOVIMIENTO DE TIERRAS
01.05.02.01 EXCAVACIONES TERRENO SEMI ROCOSO C/EQUIPO, HASTA 3.00 M PROF.(SIN EM m3 28.47 79.76 2,270.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.76 1,735.58 6.71 535.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.47 2,270.77 0.00 Metrado PPTO. 100.00%
01.05.02.02 RELLENO COMPACTADO EN TERRENO SEMIROCOSO A PULSO, CON MATERIAL PRO m3 3.44 22.10 76.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.23 27.18 2.21 48.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.44 76.02 0.00 Metrado PPTO. 100.00%
01.05.02.03 RELLENO Y COMPACTADO CON MATERIAL HORMIGON m3 3.73 122.95 458.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.52 186.88 2.21 271.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.73 458.60 0.00 Metrado PPTO. 100.00%
01.05.02.04 REFINE, NIVELACIÓN Y COMPACTACIÓN EN TERRENO SEMI ROCOSO m2 11.51 2.63 30.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.51 30.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.51 30.27 0.00 Metrado PPTO. 100.00%
01.05.02.05 ELIMINAC. DE MATERIAL EXCEDENTE T. SEMI ROCOSO DP=100M A PULSO M3. 31.29 31.54 986.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.66 809.32 5.63 177.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31.29 986.89 0.00 Metrado PPTO. 100.00%
01.05.03 OBRAS DE CONCRETO SIMPLE
01.05.03.01 CONCRETO F'C= 100KG/CM2 P/SOLADOS Y/O SUB BASES m3 0.66 332.75 219.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.66 219.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.66 219.62 0.00 Metrado PPTO. 100.00%
01.05.03.02 CONCRETO 1:10+30% P.G. P/CIMIENTOS. m3 2.34 291.84 682.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.34 682.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.34 682.91 0.00 Metrado PPTO. 100.00%
01.05.03.03 CONCRETO 1:8+25% P.M. P/SOBRECIMIENTOS m3 0.99 303.96 300.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.99 300.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.99 300.92 0.00 Metrado PPTO. 100.00%
01.05.03.04 ENCOFRADO Y DESENCOFRADO (INCL HABILIT DE MADERA) PARA SOBRECIMIENTO m2 7.90 38.72 305.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.90 305.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.90 305.89 0.00 Metrado PPTO. 100.00%
01.05.04 OBRAS DE CONCRETO ARMADO
01.05.04.01 CONCRETO F'C=210 KG/CM2 P/LOSA DE FONDO-PISO m3 1.31 442.78 580.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.31 580.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.31 580.04 0.00 Metrado PPTO. 100.00%
01.05.04.02 ACERO ESTRUC. TRABAJADO P/LOSA DE FONDO (COSTO PROM. INCL. DESPERDICIO kg 109.24 4.18 456.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 109.24 456.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 109.24 456.62 0.00 Metrado PPTO. 100.00%
01.05.04.03 CONCRETO F'C 210 KG/CM2 PARA COLUMNAS m3 0.74 488.75 361.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.74 361.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.74 361.68 0.00 Metrado PPTO. 100.00%
01.05.04.04 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA COLUMNAS TIPO CARAVIST m2 6.53 100.78 658.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.53 658.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.53 658.09 0.00 Metrado PPTO. 100.00%
01.05.04.05 ACERO ESTRUC. TRABAJADO PARA COLUMNAS (COSTO PROM. INCL. DESPERDICIO kg 98.24 4.29 421.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 98.24 421.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 98.24 421.45 0.00 Metrado PPTO. 100.00%
01.05.04.06 CONCRETO F'C= 210 KG/CM2 P/MUROS REFORZADOS m3 6.42 461.17 2,960.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.42 2,960.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.42 2,960.71 0.00 Metrado PPTO. 100.00%
01.05.04.07 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA MUROS RECTOS m2 73.51 57.66 4,238.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 73.51 4,238.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 73.51 4,238.59 0.00 Metrado PPTO. 100.00%
01.05.04.08 ACERO ESTRUC. TRABAJADO P/MURO (COSTO PROM. INCL. DESPERDICIOS) kg 454.15 4.29 1,948.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 454.15 1,948.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 454.15 1,948.30 0.00 Metrado PPTO. 100.00%
01.05.04.09 CONCRETO F'C= 210 KG/CM2 PARA VIGAS m3 0.72 446.10 321.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.72 321.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.72 321.19 0.00 Metrado PPTO. 100.00%
01.05.04.10 ENCOFRADO (INC. HABILITACION DE MADERA)P/VIGAS RECTAS Y DINTELES m2 4.63 72.73 336.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.63 336.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.63 336.74 0.00 Metrado PPTO. 100.00%
01.05.04.11 ACERO ESTRUC. TRABAJADO P/VIGAS Y DINTELES (COSTO PROM. INCL. DESPERDIC kg 103.14 4.18 431.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 103.14 431.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 103.14 431.13 0.00 Metrado PPTO. 100.00%
01.05.04.12 CONCRETO F'C=210 KG/CM2 EN LOSAS MACIZAS m3 2.03 446.10 905.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.03 905.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.03 905.58 0.00 Metrado PPTO. 100.00%
01.05.04.13 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA LOSAS MACIZAS m2 13.73 55.52 762.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.73 762.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.73 762.29 0.00 Metrado PPTO. 100.00%
01.05.04.14 ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIO kg 178.92 4.17 746.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 178.92 746.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 178.92 746.10 0.00 Metrado PPTO. 100.00%
01.05.05 MANPOSTERIA
01.05.05.01 MURO DE LADRILLO K.K. DE ARCILLA D/SOGA C/MORTERO 1:4x1.5 cm m2 18.21 54.57 993.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.21 993.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.21 993.72 0.00 Metrado PPTO. 100.00%
01.05.06 REVOQUES, ENLUCIDOS Y MOLDURAS
01.05.06.01 TARRAJEO INTERIOR C/MORTERO 1:5 X 1.5 CM (INCL. COLUMNAS EMPOT.) m2 17.70 31.87 564.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.70 564.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.70 564.10 0.00 Metrado PPTO. 100.00%
01.05.06.02 TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5 CM (INCL. COLUMNAS EMPOT.) m2 23.92 31.87 762.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.92 762.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.92 762.33 0.00 Metrado PPTO. 100.00%
01.05.06.03 VESTIDURA DE DERRAME EN PUERTA, VENTANA Y VANO m 9.90 26.11 258.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.90 258.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.90 258.49 0.00 Metrado PPTO. 100.00%
01.05.06.04 TARRAJEO DE CIELO RASOS INCLUYE VIGAS EMPOTRADAS CON MORTERO DE 1:4 X m2 9.24 37.99 351.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.24 351.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.24 351.03 0.00 Metrado PPTO. 100.00%
01.05.06.05 TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO, CANALES m2 3.95 31.66 125.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.95 125.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.95 125.06 0.00 Metrado PPTO. 100.00%
01.05.06.06 TARRAJEO CON IMPERMEABILIZANTE DE MUROS EN CÁMARAS m2 37.63 46.94 1,766.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 37.63 1,766.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 37.63 1,766.35 0.00 Metrado PPTO. 100.00%
01.05.07 PISOS Y PAVIMENTOS
01.05.07.01 FALSO PISO DE CONCRETO 1:10 DE ESPESOR 4" m2 2.97 33.44 99.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.97 99.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.97 99.32 0.00 Metrado PPTO. 100.00%
01.05.07.02 CONTRAPISO DE 48 mm C/MORTERO 1:5 x 38 mm EN BASE 1:2 x 10 mm ACABADO m2 2.97 29.76 88.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.97 88.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.97 88.39 0.00 Metrado PPTO. 100.00%
01.05.08 ZOCALOS Y CONTRAZOCALOS_x000D_
01.05.08.01 CONTRAZOCALO DE CEMENTO S/COLOREAR, CON IMPERMEABILIZANTE H= 0,30 M m 8.10 10.22 82.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.10 82.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.10 82.78 0.00 Metrado PPTO. 100.00%
01.05.09 CUBIERTAS_x000D_
01.05.09.01 COBERTURAS C/TEJA ANDINA 1.16X0.72M SEGUN DISEÑO m2 9.24 95.66 883.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.24 883.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.24 883.90 0.00 Metrado PPTO. 100.00%
01.05.10 CARPINTERIA METALICA Y HERRERIA
01.05.10.01 PUERTA METALICA LAC 1/8" CON MARCO DE 2"X2"X1/4 Y REFUERZOS m2 1.68 354.03 594.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.68 594.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.68 594.77 0.00 Metrado PPTO. 100.00%
01.05.10.02 VENTANA DE FIERRO C/PERFIL DE " L"DE 2" X 1/4"FIJA MAS FIERRO CORRUGADO D m2 0.66 167.66 110.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.66 110.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.66 110.66 0.00 Metrado PPTO. 100.00%
01.05.10.03 CERRADURA PARA EXTERIOR C/LLAVES INT. Y EXT. DE 2 GOLPES und 1.00 57.77 57.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 57.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 57.77 0.00 Metrado PPTO. 100.00%
01.05.11 PINTURA
01.05.11.01 PINTADO DE CIELO RASO CON LATEX VINILICO (SIMILAR) m2 9.24 9.73 89.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.24 89.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.24 89.91 0.00 Metrado PPTO. 100.00%
01.05.11.02 PINTADO DE MURO INTERIOR CON LATEX VINILICO (SIMILAR) m2 17.70 7.47 132.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.70 132.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.70 132.22 0.00 Metrado PPTO. 100.00%
01.05.11.03 PINTADO DE MURO EXTERIOR C/ LATEX VINILICO (SIMILAR) m2 23.92 8.22 196.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.92 196.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.92 196.62 0.00 Metrado PPTO. 100.00%
01.05.11.04 PINTADO DE PUERTAS METALICAS (2manos anticorrosiva+2esmalte) m2 3.36 14.63 49.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.36 49.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.36 49.16 0.00 Metrado PPTO. 100.00%
01.05.11.05 PINTADO DE VENTANAS METALICAS (2MANOS ANTICORROSIVA + 2ESMALTE) m2 0.66 9.10 6.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.66 6.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.66 6.01 0.00 Metrado PPTO. 100.00%
01.05.12 ADITAMENTOS VARIOS
01.05.12.01 PROVISION Y COLOCACION DE JUNTA WATER STOP DE PVC E=6" m 13.20 22.20 293.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.20 293.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.20 293.04 0.00 Metrado PPTO. 100.00%
01.05.12.02 TAPA SANITARIA DE INSPECCION 0.80 x 0.80 m und 3.00 339.19 1,017.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 1,017.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 1,017.57 0.00 Metrado PPTO. 100.00%
01.05.12.03 VEREDA DE CONCRETO F'C=175 KG/CM2, E=0.10 M PASTA 1:2 C/EMPLEO DE MEZ m2 10.81 81.68 882.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.41 441.48 5.41 441.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.81 882.96 0.00 Metrado PPTO. 100.00%
01.05.12.04 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA ANCLAJES Y/O DADOS m2 20.41 39.16 799.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.21 399.63 10.21 399.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.41 799.26 0.00 Metrado PPTO. 100.00%
01.05.13 EQUIPAMIENTO HIDRAULICO_x000D_
01.05.13.01 TUBERIA PVC SAP C-10 P/AGUA D= 1/2" m 10.00 1.34 13.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 13.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 13.40 0.00 Metrado PPTO. 100.00%
01.05.13.02 BRIDA ROMPE AGUA Ø 6" Hº Dº_x000D_ und 2.00 480.00 960.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 960.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 960.00 0.00 Metrado PPTO. 100.00%
01.05.13.03 TUBERIA DE HºDº, BRIDADA Ø 6" m 4.00 220.50 882.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 882.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 882.00 0.00 Metrado PPTO. 100.00%
01.05.13.04 EQUIPO DE CLORACION Y ACCESORIOS INCL. INSTALACION (TUBERIA, VALVULAS Y GLB 1.00 2,923.73 2,923.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,923.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,923.73 0.00 Metrado PPTO. 100.00%
01.05.13.05 BRIDA ROMPE AGUA Ø 4" Hº Dº"_x000D_ und 6.00 322.03 1,932.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 1,932.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 1,932.18 0.00 Metrado PPTO. 100.00%
01.05.13.06 TUBERIA DE HºDº, BRIDADA Ø 4" m 7.00 189.00 1,323.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 1,323.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 1,323.00 0.00 Metrado PPTO. 100.00%
01.05.13.07 INSTALACION
01.05.13.07.01 MONTAJE DE INSTALACIÓN HIDRÁULICA DE CAMARA DE CONTACTO GLB 1.00 664.32 664.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.80 531.46 0.20 132.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 664.32 0.00 Metrado PPTO. 100.00%
01.06 LAVADO DE ARENAS_x000D_
01.06.01 OBRAS PRELIMINARES
01.06.01.01 TRAZO Y REPLANTEO INICIAL DEL PROYECTO, PARA EDIFICACIÓN CON ESTACIÓN T m2 12.00 1.98 23.76 0.00 12.00 23.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 23.76 0.00 Metrado PPTO. 100.00%
01.06.01.02 REPLANTEO FINAL DE LA OBRA CON ESTACIÓN TOTAL m2 12.00 0.62 7.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 7.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 7.44 0.00 Metrado PPTO. 100.00%
01.06.02 MOVIMIENTO DE TIERRAS
01.06.02.01 EXCAVACIONES TERRENO SEMI ROCOSO C/EQUIPO, HASTA 3.00 M PROF.(SIN EM m3 0.13 79.76 10.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.13 10.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.13 10.37 0.00 Metrado PPTO. 100.00%
01.06.02.02 REFINE, NIVELACIÓN Y COMPACTACIÓN EN TERRENO SEMI ROCOSO m2 0.32 2.63 0.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.32 0.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.32 0.84 0.00 Metrado PPTO. 100.00%
01.06.02.03 ELIMINAC. DE MATERIAL EXCEDENTE T. SEMI ROCOSO DP=100M A PULSO M3. 0.18 31.54 5.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.18 5.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.18 5.68 0.00 Metrado PPTO. 100.00%
01.06.03 CONCRETO SIMPLE
01.06.03.01 CONCRETO F'C= 100KG/CM2 P/SOLADOS Y/O SUB BASES m3 0.60 332.75 199.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.60 199.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.60 199.65 0.00 Metrado PPTO. 100.00%
01.06.03.02 CONCRETO 1:10+30% P.G. P/CIMIENTOS. m3 0.13 291.84 37.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.13 37.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.13 37.94 0.00 Metrado PPTO. 100.00%
01.06.03.03 CONCRETO 1:8+25% P.M. P/SOBRECIMIENTOS m3 0.02 303.96 6.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 6.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 6.08 0.00 Metrado PPTO. 100.00%
01.06.03.04 ENCOFRADO Y DESENCOFRADO (INCL HABILIT DE MADERA) PARA SOBRECIMIENTO m2 0.07 38.72 2.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.07 2.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.07 2.71 0.00 Metrado PPTO. 100.00%
01.06.04 CONCRETO ARMADO
01.06.04.01 CONCRETO F'C=210 KG/CM2 P/LOSA DE FONDO-PISO m3 1.80 442.78 797.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.80 797.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.80 797.00 0.00 Metrado PPTO. 100.00%
01.06.04.02 ACERO ESTRUC. TRABAJADO P/LOSA DE FONDO (COSTO PROM. INCL. DESPERDICIO kg 58.97 4.18 246.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.97 246.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.97 246.49 0.00 Metrado PPTO. 100.00%
01.06.05 MUROS Y TABIQUES DE ALBAÑILERIA_x000D_
01.06.05.01 MURO DE LADRILLO K.K. DE ARCILLA D/SOGA C/MORTERO 1:4x1.5 cm m2 12.76 54.57 696.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.76 696.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.76 696.31 0.00 Metrado PPTO. 100.00%
01.06.06 REVOQUES ENLUCIDOS Y MOLDURAS
01.06.06.01 TARRAJEO INTERIOR C/MORTERO 1:5 X 1.5 CM (INCL. COLUMNAS EMPOT.) m2 11.48 31.87 365.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.48 365.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.48 365.87 0.00 Metrado PPTO. 100.00%
01.06.06.02 TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5 CM (INCL. COLUMNAS EMPOT.) m2 14.00 31.87 446.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 446.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 446.18 0.00 Metrado PPTO. 100.00%
01.06.07 EQUIPAMIENTO HIDRAULICO_x000D_
01.06.07.01 TUBERIA FIE.GALVANIZADO PESADO C-40 2" I/ELEM.UNION+ 2%DESP. ML. 0.40 20.14 8.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.40 Metrado PPTO. 0.00%
01.06.07.02 TUBERIA FIE.GALVANIZADO PESADO C-40 1" I/ELEM.UNION+ 2%DESP. ML. 0.20 10.37 2.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.20 Metrado PPTO. 0.00%
01.06.07.03 VALVULA COMPUERTA DE BRONCE ROSCADA DE 2" und 1.00 93.05 93.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
01.06.07.04 VALVULA COMPUERTA DE BRONCE ROSCADA DE 1" und 1.00 29.49 29.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
01.06.07.05 INSTALACION DE TUBERIA FºGº PESADO C-40 Ø 1" - 2"_x000D_ m 0.60 1.71 1.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.60 Metrado PPTO. 0.00%
01.06.07.06 INSTALACION DE ACCESORIOS DE BRONCE Ø 1"- 2 1/2"_x000D_ und 2.00 1.42 2.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 Metrado PPTO. 0.00%
01.07 SISTEMA DE LIMPIEZA Y PURGA DE PTAP SONDOR
01.07.01 CUNETA DE CORONACION_x000D_
01.07.01.01 TRABAJOS PRELIMINARES
01.07.01.01.01 TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACI KM 0.13 391.63 50.91 0.00 0.13 50.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.13 50.91 0.00 Metrado PPTO. 100.00%
01.07.01.01.02 REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL KM 0.13 127.78 16.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.13 16.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.13 16.61 0.00 Metrado PPTO. 100.00%
01.07.01.02 MOVIMIENTO DE TIERRAS
01.07.01.02.01 EXCAVACION MANUAL EN T-SEMI ROCOSO HASTA H=1.00M m3 58.57 53.50 3,133.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.57 3,133.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.57 3,133.50 0.00 Metrado PPTO. 100.00%
01.07.01.02.02 REFINE, NIVELACIÓN Y COMPACTACIÓN EN TERRENO SEMI ROCOSO m2 130.15 2.63 342.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 130.15 342.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 130.15 342.29 0.00 Metrado PPTO. 100.00%
01.07.01.02.03 ELIMINAC. DE MATERIAL EXCEDENTE T. SEMI ROCOSO DP=100M A PULSO M3. 73.21 31.54 2,309.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 73.21 2,309.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 73.21 2,309.04 0.00 Metrado PPTO. 100.00%
01.07.01.03 REVESTIMIENTO DE CUNETA_x000D_
01.07.01.03.01 EMPEDRADO E = 0.10 M P.M._x000D_ m2 130.15 68.73 8,945.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 130.15 8,945.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 130.15 8,945.21 0.00 Metrado PPTO. 100.00%
01.07.02 COLECTORES_x000D_
01.07.02.01 TRABAJOS PRELIMINARES
01.07.02.01.01 TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACI KM 0.08 391.63 31.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.08 31.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.08 31.33 0.00 Metrado PPTO. 100.00%
01.07.02.01.02 REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL KM 0.08 127.78 10.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.08 10.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.08 10.22 0.00 Metrado PPTO. 100.00%
01.07.02.02 MOVIMIENTO DE TIERRAS
01.07.02.02.01 EXCAVACIONES TERRENO SEMI ROCOSO C/EQUIPO, DN 200-250 MM H=1.01 A m 77.34 54.42 4,208.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77.34 4,208.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77.34 4,208.84 0.00 Metrado PPTO. 100.00%
01.07.02.02.02 REFINE Y NIVELACION ZANJA T. SEMI ROCOSO PARA TUB. DN 200-250 PARA TOD m 77.34 2.52 194.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77.34 194.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77.34 194.90 0.00 Metrado PPTO. 100.00%
01.07.02.02.03 RELLENO COMP. ZANJA (PULSO) MATERIAL PROPIO SELECCIONADO P/TUB. DN m 77.34 23.75 1,836.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77.34 1,836.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77.34 1,836.83 0.00 Metrado PPTO. 100.00%
01.07.02.02.04 ELIMINAC. DE MATERIAL EXCEDENTE T. SEMI ROCOSO DP=100M A PULSO M3. 64.97 31.54 2,049.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.97 2,049.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.97 2,049.15 0.00 Metrado PPTO. 100.00%
01.07.02.03 SUMINISTRO E INSTALACION DE TUBERIA PVC U UF, NTP ISO 4435:2005
01.07.02.03.01 TUBERIA PVC-U UR NTP ISO 4435:2005 SN-2, SDR-51 DN 200 MM INCL. ANILLO m 77.34 45.37 3,508.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77.34 3,508.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77.34 3,508.92 0.00 Metrado PPTO. 100.00%
01.07.02.03.02 INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 200 INC. PRUEBA HIDRAULICA m 77.34 7.43 574.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77.34 574.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77.34 574.64 0.00 Metrado PPTO. 100.00%
01.07.02.04 CONSTRUCCION DE BUZONES STANDAR
01.07.02.04.01 BUZON STANDAR, T. SEMI ROCOSO, HASTA H= 2.00M PROF. (INCL. ENCOFR. INT und 8.00 4,351.25 34,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 34,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 34,810.00 0.00 Metrado PPTO. 100.00%
01.07.02.05 PRUEBAS DE CALIDAD
01.07.02.05.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 8.00 65.29 522.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 522.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 522.32 0.00 Metrado PPTO. 100.00%
01.07.02.05.02 PRUEBA DE COMPACTACION DE SUELOS (PROCTO MODIF) und 2.00 111.90 223.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 223.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 223.80 0.00 Metrado PPTO. 100.00%
01.08 CERCO PERIMETRICO (INCL. PUERTA DE INGRESO)
01.08.01 OBRAS PRELIMINARES
01.08.01.01 TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS CON ESTACION TOTA KM 0.14 391.63 54.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.05 19.58 0.00 0.00 0.00 0.09 35.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.14 54.83 0.00 Metrado PPTO. 100.00%
01.08.01.02 REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL KM 0.14 127.78 17.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.14 17.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.14 17.89 0.00 Metrado PPTO. 100.00%
01.08.02 MOVIMIENTO DE TIERRAS
01.08.02.01 EXCAVACION MANUAL EN T-SEMI ROCOSO HASTA H=1.00M m3 98.00 53.50 5,243.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.00 2,621.50 49.00 2,621.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 98.00 5,243.00 0.00 Metrado PPTO. 100.00%
01.08.02.02 RELLENO Y COMPACTADO CON MATERIAL HORMIGON m3 28.00 122.95 3,442.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 1,721.30 14.00 1,721.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 3,442.60 0.00 Metrado PPTO. 100.00%
01.08.02.03 ELIMINAC. DE MATERIAL EXCEDENTE T. SEMI ROCOSO DP=100M A PULSO M3. 87.50 31.54 2,759.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43.75 1,379.88 43.75 1,379.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 87.50 2,759.76 0.00 Metrado PPTO. 100.00%
01.08.03 OBRAS DE CONCRETO
01.08.03.01 CONCRETO 1:10+30% P.G. P/CIMIENTOS. m3 42.00 291.84 12,257.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.00 6,128.64 21.00 6,128.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.00 12,257.28 0.00 Metrado PPTO. 100.00%
01.08.03.02 CONCRETO 1:8+25% P.M. P/SOBRECIMIENTOS m3 8.40 303.96 2,553.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.70 820.69 0.00 0.00 0.00 4.20 1,276.63 1.50 455.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.40 2,553.26 0.00 Metrado PPTO. 100.00%
01.08.03.03 ENCOFRADO Y DESENCOFRADO (INCL HABILIT DE MADERA) PARA SOBRECIMIENTO m2 112.00 38.72 4,336.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.00 1,393.92 0.00 0.00 0.00 56.00 2,168.32 20.00 774.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 112.00 4,336.64 0.00 Metrado PPTO. 100.00%
01.08.03.04 CONCRETO F'C 210 KG/CM2 PARA COLUMNAS m3 4.32 488.75 2,111.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.44 703.80 0.00 0.00 0.00 0.90 439.88 0.00 1.98 967.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.32 2,111.41 0.00 Metrado PPTO. 100.00%
01.08.03.05 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA COLUMNAS TIPO CARAVIST m2 100.80 100.78 10,158.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.60 3,386.21 0.00 0.00 0.00 56.00 5,643.68 0.00 11.20 1,128.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.80 10,158.63 0.00 Metrado PPTO. 100.00%
01.08.03.06 ACERO ESTRUC. TRABAJADO PARA COLUMNAS (COSTO PROM. INCL. DESPERDICIO kg 609.41 4.29 2,614.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 203.14 871.47 0.00 0.00 0.00 126.96 544.66 0.00 279.31 1,198.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 609.41 2,614.37 0.00 Metrado PPTO. 100.00%
01.08.04 CARPINTERIA METALICA Y HERRERIA 0
01.08.04.01 MALLA ALAMBRE GALV #10 COCADA 51MM P/CERCO PERIMETRICO m2 308.16 124.32 38,310.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 168.00 20,885.76 0.00 140.16 17,424.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 308.16 38,310.45 0.00 Metrado PPTO. 100.00%
01.08.04.02 PUERTA METAL LAC 1/16" C/MARCO 2"X2"X1/4" Y REFUERZOS Y TUBO FºGº Ø4" M2. 6.00 299.91 1,799.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 1,799.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 1,799.46 0.00 Metrado PPTO. 100.00%
01.08.05 CERRAJERIA
01.08.05.01 CERRADURA PARA EXTERIOR C/LLAVES INT. Y EXT. DE 2 GOLPES und 1.00 57.77 57.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 57.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 57.77 0.00 Metrado PPTO. 100.00%
01.08.05.02 CANDADO INCLUYENDO ALDABAS und 2.00 44.00 88.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 88.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 88.00 0.00 Metrado PPTO. 100.00%
01.08.05.03 BISAGRAS TUBULARES und 6.00 9.00 54.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 54.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 54.00 0.00 Metrado PPTO. 100.00%
01.08.05.04 CERROJO Y PESTILLO und 2.00 57.08 114.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 114.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 114.16 0.00 Metrado PPTO. 100.00%
01.08.05.05 PICAPORTE DE FIERRO REDONDO DE 1/2" X 0.50 M. und 2.00 14.42 28.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 28.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 28.84 0.00 Metrado PPTO. 100.00%
01.08.06 PINTURA
01.08.06.01 PINTADO DE PUERTAS METALICAS LAC (2 MANOS ANTIC.+2 ESMALTE) m2 12.00 8.64 103.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 103.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 103.68 0.00 Metrado PPTO. 100.00%
01.08.07 DADOS DE CONCRETO_x000D_
01.08.07.01 CONCRETO F'C= 175 KG/CM2 (CEMENTO MS) m3 0.05 399.94 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.05 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.05 20.00 0.00 Metrado PPTO. 100.00%
01.09 MURO DE CONTENCION
01.09.01 OBRAS PRELIMINARES
01.09.01.01 TRAZO Y REPLANTEO INICIAL DEL PROYECTO, PARA EDIFICACIÓN CON ESTACIÓN T m2 232.75 1.98 460.85 0.00 0.00 0.00 232.75 460.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 232.75 460.85 0.00 Metrado PPTO. 100%
01.09.01.02 REPLANTEO FINAL DE LA OBRA CON ESTACIÓN TOTAL m2 232.75 0.62 144.31 0.00 0.00 0.00 0.00 0.00 0.00 232.75 144.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 232.75 144.31 0.00 Metrado PPTO. 100%
01.09.02 MOVIMIENTO DE TIERRAS
01.09.02.01 EXCAVACIONES TERRENO SEMI ROCOSO C/EQUIPO, HASTA 3.00 M PROF.(SIN EM m3 436.96 79.76 34,851.93 0.00 0.00 0.00 436.96 34,851.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 436.96 34,851.93 0.00 Metrado PPTO. 100%
01.09.02.02 REFINE, NIVELACIÓN Y COMPACTACIÓN EN TERRENO SEMI ROCOSO m2 232.75 2.63 612.13 0.00 0.00 0.00 0.00 0.00 0.00 232.75 612.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 232.75 612.13 0.00 Metrado PPTO. 100%
01.09.02.03 RELLENO COMPACTADO EN TERRENO SEMIROCOSO A PULSO, CON MATERIAL PRO m3 297.31 22.10 6,570.55 0.00 0.00 0.00 0.00 0.00 0.00 148.66 3,285.28 148.66 3,285.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 297.31 6,570.56 0.00 Metrado PPTO. 100%
01.09.02.04 RELLENO Y COMPACTADO CON MATERIAL HORMIGON m3 69.83 122.95 8,585.60 0.00 0.00 0.00 0.00 0.00 0.00 69.83 8,585.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 69.83 8,585.60 0.00 Metrado PPTO. 100%
01.09.02.05 RELLENO COMPACTADO CON MATERIAL DE PRÉSTAMO AFIRMADO (INCL. PROVISI m3 46.55 119.06 5,542.24 0.00 0.00 0.00 0.00 0.00 0.00 46.55 5,542.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 46.55 5,542.24 0.00 Metrado PPTO. 100%
01.09.02.06 ELIMINACION (MAQ) DE MATERIAL EXCENTE DP= 5.00 KM m3 234.61 11.99 2,812.97 0.00 0.00 0.00 234.61 2,812.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 234.61 2,812.97 0.00 Metrado PPTO. 100.00%
RESUMEN DE METRADOS
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
“INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PIURA
OBRA
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88 F.R. =
CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S.
CONTRATISTA CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL
MORROPON HUANCABAMBA (GR)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
RESUMEN DE METRADOS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 SALDO DE
TOTAL METRADO TOTAL METRADO Control de Metrados Porcentaje de
VALORIZADO Avance
VALORIZACIÓN N° 01 VALORIZACIÓN N° 02 VALORIZACIÓN N° 03 VALORIZACIÓN N° 04 VALORIZACIÓN N° 05 VALORIZACIÓN N° 06 VALORIZACIÓN N° 07 VALORIZACIÓN N° 08 VALORIZACIÓN N° 09 VALORIZACIÓN N° 10 VALORIZACIÓN N° 11 VALORIZACIÓN N° 12 VALORIZACIÓN N° 13 VALORIZACIÓN N° 14 VALORIZACIÓN N° 15 VALORIZACIÓN N° 16 VALORIZACIÓN N° 17 VALORIZACIÓN N° 18 VALORIZACIÓN N° 19 VALORIZACIÓN N° 20 PRESUPUESTO
Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/.
01.09.03 OBRAS DE CONCRETO SIMPLE
01.09.03.01 CONCRETO F'C= 100KG/CM2 P/SOLADOS Y/O SUB BASES m3 23.28 332.75 7,746.42 0.00 0.00 0.00 0.00 0.00 0.00 23.28 7,746.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.28 7,746.42 0.00 Metrado PPTO. 100.00%
01.09.04 OBRAS DE CONCRETO ARMADO
01.09.04.01 CONCRETO F'C=210 KG/CM2 P/ZAPATA m3 116.38 425.70 49,542.97 0.00 0.00 0.00 0.00 0.00 0.00 116.38 49,542.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 116.38 49,542.97 0.00 Metrado PPTO. 100.00%
01.09.04.02 ACERO ESTRUC. TRABAJADO P/ZAPATA, LOSA DE FONDO (COSTO PROM. INCL. DE kg 5,575.34 4.18 23,304.92 0.00 0.00 0.00 0.00 0.00 0.00 5,575.34 23,304.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,575.34 23,304.92 0.00 Metrado PPTO. 100.00%
01.09.04.03 CONCRETO F'C= 210 KG/CM2 P/MUROS REFORZADOS m3 116.73 461.17 53,832.37 0.00 0.00 0.00 0.00 0.00 0.00 60.66 27,974.57 56.07 25,857.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 116.73 53,832.37 0.00 Metrado PPTO. 100.00%
01.09.04.04 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA MUROS RECTOS m2 621.13 57.66 35,814.36 0.00 0.00 0.00 0.00 0.00 0.00 242.95 14,008.50 378.18 21,805.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 621.13 35,814.36 0.00 Metrado PPTO. 100.00%
01.09.04.05 ACERO ESTRUC. TRABAJADO P/MURO (COSTO PROM. INCL. DESPERDICIOS) kg 8,376.54 4.29 35,935.36 0.00 0.00 0.00 0.00 0.00 0.00 8,376.54 35,935.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,376.54 35,935.36 0.00 Metrado PPTO. 100.00%
01.09.05 ADITAMENTOS VARIOS 0.00 0.00
01.09.05.01 PROVISION Y COLOCADO DE TECNOPORT DE 1" m2 29.18 17.93 523.20 0.00 0.00 0.00 0.00 0.00 0.00 17.97 322.20 11.21 201.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29.18 523.20 0.00 Metrado PPTO. 100.00%
01.09.05.02 TUBERIA DE PVC Ø 1" m 21.60 8.41 181.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.60 181.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.60 181.66 0.00 Metrado PPTO. 100.00%
01.10 FLETES
01.10.01 FLETE TRANSPORTE DE MATERIALES (PIURA - PTAP SONDOR). GLB 1.00 227,915.68 227,915.68 0.00 0.00 0.00 0.00 0.60 136,749.41 0.20 45,583.14 0.20 45,583.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 227,915.69 0.00
COSTO DIRECTO 1,541,799.26 0.00 26,553.13 227,228.33 136,749.41 45,583.14 222,587.64 59,414.26 25,058.81 85,134.15 193,272.51 222,057.48 195,727.23 102,296.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,541,662.73
GASTOS GENERALES NO RELACIONADOS CON EL TIEMPO DE EJECUCION DE LA OBRA
(GASTOS FIJOS) 1.1469736% 17,684.03 0.00 304.56 2,606.25 1,568.48 522.83 2,553.02 681.47 287.42 976.47 2,216.78 2,546.94 2,244.94 1,173.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17,682.46
GASTOS GENERALES RELACIONADOS CON EL TIEMPO DE EJECUCION DE LA OBRA 5.1765349% 79,811.78 0.00 1,374.53 11,762.55 7,078.88 2,359.63 11,522.33 3,075.60 1,297.18 4,407.00 10,004.82 11,494.88 10,131.89 5,295.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 79,804.71
(GASTOS VARIABLES)
UTILIDAD 7.00% 107,925.95 0.00 1,858.72 15,905.98 9,572.46 3,190.82 15,581.13 4,159.00 1,754.12 5,959.39 13,529.08 15,544.02 13,700.91 7,160.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 107,916.39
SUB TOTAL 1,747,221.02 0.00 30,090.94 257,503.11 154,969.23 51,656.42 252,244.12 67,330.33 28,397.53 96,477.01 219,023.19 251,643.32 221,804.97 115,926.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,747,066.29
IGV (18%) 314,499.78 0.00 5,416.37 46,350.56 27,894.46 9,298.16 45,403.94 12,119.46 5,111.56 17,365.86 39,424.17 45,295.80 39,924.89 20,866.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 314,471.93
PRESUPUESTO TOTAL 2,061,720.80 0.00 35,507.31 303,853.67 182,863.69 60,954.58 297,648.06 79,449.79 33,509.09 113,842.87 258,447.36 296,939.12 261,729.86 136,792.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,061,538.22
“INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PIURA
OBRA
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88 F.R. =
CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S.
CONTRATISTA CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL
MORROPON HUANCABAMBA (GR)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
RESUMEN DE METRADOS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 TOTAL METRADO SALDO DE Porcentaje de
VALORIZADO TOTAL METRADO Control de Metrados Avance
VALORIZACIÓN N° 01 VALORIZACIÓN N° 02 VALORIZACIÓN N° 03 VALORIZACIÓN N° 04 VALORIZACIÓN N° 05 VALORIZACIÓN N° 06 VALORIZACIÓN N° 07 VALORIZACIÓN N° 08 VALORIZACIÓN N° 09 VALORIZACIÓN N° 10 VALORIZACIÓN N° 11 VALORIZACIÓN N° 12 VALORIZACIÓN N° 13 VALORIZACIÓN N° 14 VALORIZACIÓN N° 15 VALORIZACIÓN N° 16 VALORIZACIÓN N° 17 VALORIZACIÓN N° 18 VALORIZACIÓN N° 19 VALORIZACIÓN N° 20 PRESUPUESTO
Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/.
02.10.01 OBRAS PRELIMINARES
02.10.01.01 TRAZO Y REPLANTEO INICIALES m2 0.75 1.35 1.01 0.00 0.75 1.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 1.01 0.00 Metrado PPTO. 100.00%
02.10.01.02 TRAZO Y REPLANTEO FINALES m2 0.75 1.02 0.77 0.00 0.00 0.00 0.00 0.00 0.00 0.75 0.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 0.77 0.00 Metrado PPTO. 100.00%
02.10.02 MOVIMIENTO DE TIERRAS
02.10.02.01 EXCAVACIONES TERRENO SEMI ROCOSO C/EQUIPO, HASTA 3.00 M PROF.(SIN EM m3 1.01 79.76 80.56 0.00 0.00 0.00 0.00 0.00 0.00 1.01 80.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.01 80.56 0.00 Metrado PPTO. 100.00%
02.10.02.02 REFINE, NIVELACIÓN Y COMPACTACIÓN EN TERRENO SEMI ROCOSO m2 0.75 2.63 1.97 0.00 0.00 0.00 0.00 0.00 0.00 0.75 1.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 1.97 0.00 Metrado PPTO. 100.00%
02.10.02.03 ELIMINAC. DE MATERIAL EXCEDENTE T. SEMI ROCOSO DP=100M A PULSO M3. 1.27 31.54 40.06 0.00 0.00 0.00 0.00 0.00 0.00 1.27 40.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.27 40.06 0.00 Metrado PPTO. 100.00%
02.10.03 OBRAS DE CONCRETO
02.10.03.01 CONCRETO F'C= 100KG/CM2 P/SOLADOS Y/O SUB BASES m3 0.04 332.75 13.31 0.00 0.00 0.00 0.00 0.00 0.00 0.04 13.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 13.31 0.00 Metrado PPTO. 100.00%
02.10.03.02 CONCRETO F'C=210 KG/CM2 P/LOSA DE FONDO-PISO m3 0.08 442.78 35.42 0.00 0.00 0.00 0.00 0.00 0.00 0.08 35.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.08 35.42 0.00 Metrado PPTO. 100.00%
02.10.03.03 ACERO ESTRUC. TRABAJADO P/LOSA DE FONDO (COSTO PROM. INCL. DESPERDICIO kg 4.76 4.15 19.75 0.00 0.00 0.00 0.00 0.00 0.00 4.76 19.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.76 19.75 0.00 Metrado PPTO. 100.00%
02.10.03.04 CONCRETO F'C= 210 KG/CM2 P/MUROS REFORZADOS m3 0.24 493.25 118.38 0.00 0.00 0.00 0.00 0.00 0.00 0.24 118.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.24 118.38 0.00 Metrado PPTO. 100.00%
02.10.03.05 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA MUROS RECTOS m2 4.92 57.66 283.69 0.00 0.00 0.00 0.00 0.00 0.00 4.92 283.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.92 283.69 0.00 Metrado PPTO. 100.00%
02.10.03.06 ACERO ESTRUC. TRABAJADO P/MURO (COSTO PROM. INCL. DESPERDICIOS) kg 10.58 4.26 45.07 0.00 0.00 0.00 0.00 0.00 0.00 10.58 45.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.58 45.07 0.00 Metrado PPTO. 100.00%
02.10.04 REVOQUES, ENLUCIDOS Y MOLDURAS
02.10.04.01 TARRAJEO CON IMPERMEABILIZANTE DE MUROS EN CAJA DE VALVULA m2 4.82 39.79 191.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.82 191.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.82 191.79 0.00 Metrado PPTO. 100.00%
02.10.05 CARPINTERIA METALICA Y HERRERIA
02.10.05.01 TAPA METALICA SANITARIA C/PLANCHA ESTRIADA E=1/4" m2 1.00 794.17 794.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 794.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 794.17 0.00 Metrado PPTO. 100.00%
02.11 EQUIPAMIENTO HIDRAULICO
02.11.01 CANASTILLA DE PVC DE 4" A 3" und 1.00 62.40 62.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 62.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 62.40 0.00 Metrado PPTO. 100.00%
02.11.02 UNION PVC SP Ø 3"_x000D_ und 1.00 11.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 11.00 0.00 Metrado PPTO. 100.00%
02.11.03 UNION UNIVERSAL PVC SP Ø 2"_x000D_ und 6.00 32.00 192.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 192.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 192.00 0.00 Metrado PPTO. 100.00%
02.11.04 ADAPTADOR PVC SP Ø 2"_x000D_ und 6.00 7.35 44.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 44.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 44.10 0.00 Metrado PPTO. 100.00%
02.11.05 VALVULA DE BRONCE ROSCADA Ø 2"_x000D_ und 3.00 91.53 274.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 274.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 274.59 0.00 Metrado PPTO. 100.00%
02.11.06 CONO DE REBOSE PVC SP Ø 2"_x000D_ und 1.00 12.80 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 12.80 0.00 Metrado PPTO. 100.00%
02.11.07 CODO 90º PVC SP Ø 2"_x000D_ und 5.00 8.20 41.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 41.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 41.00 0.00 Metrado PPTO. 100.00%
02.11.08 TEE PVC SP Ø 2"_x000D_ und 4.00 9.50 38.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 38.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 38.00 0.00 Metrado PPTO. 100.00%
02.11.09 VALVULA FLOTADORA Ø2" und 1.00 211.90 211.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 211.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 211.90 0.00 Metrado PPTO. 100.00%
02.11.10 TAPON MACHO SP PVC Ø 2"_x000D_ und 2.00 6.02 12.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 12.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 12.04 0.00 Metrado PPTO. 100.00%
02.11.11 TEE PVC Ø 3" A 2" und 1.00 30.54 30.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 30.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 30.54 0.00 Metrado PPTO. 100.00%
02.11.12 UNION UNIVERSAL PVC SP Ø 3"_x000D_ und 2.00 62.50 125.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 125.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 125.00 0.00 Metrado PPTO. 100.00%
02.11.13 ADAPTADOR PVC SP Ø 3"_x000D_ und 2.00 9.96 19.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 19.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 19.92 0.00 Metrado PPTO. 100.00%
02.11.14 VALVULA DE BRONCE ROSCADA Ø 3"_x000D_ und 1.00 156.80 156.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 156.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 156.80 0.00 Metrado PPTO. 100.00%
02.11.15 HIPOCLORADOR_x000D_ und 1.00 110.00 110.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 110.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 110.00 0.00 Metrado PPTO. 100.00%
02.11.16 TUBERIA PVS SP Ø 2" I/ELEM DE UNION + 2% DESP_x000D_ m 9.23 16.29 150.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.23 150.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.23 150.36 0.00 Metrado PPTO. 100.00%
02.11.17 TUBERIA PVS SP Ø 3" I/ELEM DE UNION + 2% DESP_x000D_ m 2.04 29.39 59.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.04 59.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.04 59.96 0.00 Metrado PPTO. 100.00%
02.11.18 CODO FIERRO GALVANIZADO Ø2" und 2.00 7.05 14.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 14.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 14.10 0.00 Metrado PPTO. 100.00%
02.11.19 TUBERIA Fº Gº Ø 2 1/2" I/ELEM DE UNION + 2% DESP_x000D_ m 0.41 16.60 6.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.41 6.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.41 6.81 0.00 Metrado PPTO. 100.00%
02.11.20 INSTALACION
02.11.20.01 MONTAJE DE INSTALACIÓN HIDRÁULICA DE RESERVORIO ROSARIO V=8M3 GLB 1.00 664.43 664.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 664.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 664.43 0.00 Metrado PPTO. 100.00%
02.12 CERCO PERIMETRICO INCL. PUERTA DE INGRESO
02.12.01 OBRAS PRELIMINARES
02.12.01.01 TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACIO KM 0.04 391.63 15.67 0.00 0.04 15.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 15.67 0.00 Metrado PPTO. 100.00%
02.12.01.02 REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL KM 0.04 127.78 5.11 0.00 0.00 0.00 0.00 0.00 0.00 0.04 5.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 5.11 0.00 Metrado PPTO. 100.00%
02.12.01.03 LIMPIEZA DE TERRENO MANUAL m2 80.00 3.65 292.00 0.00 0.00 0.00 0.00 0.00 0.00 80.00 292.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 80.00 292.00 0.00 Metrado PPTO. 100.00%
02.12.02 MOVIMIENTO DE TIERRAS
02.12.02.01 EXCAVACION MANUAL T. SEMI ROCOSO HASTA H=0,60M m3 1.92 61.17 117.45 0.00 0.00 0.00 0.00 0.00 0.00 1.92 117.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.92 117.45 0.00 Metrado PPTO. 100.00%
02.12.02.02 ELIMINAC. DE MATERIAL EXCEDENTE T. SEMI ROCOSO DP=100M A PULSO M3. 2.40 31.54 75.70 0.00 0.00 0.00 0.00 0.00 0.00 2.40 75.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.40 75.70 0.00 Metrado PPTO. 100.00%
02.12.03 OBRAS DE CONCRETO
02.12.03.01 CONCRETO F'C 140 KG/CM2 P/CIMIENTO CORRIDO (CEMENTO MS) m3 1.28 410.37 525.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.28 525.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.28 525.27 0.00 Metrado PPTO. 100.00%
02.12.04 CARPINTERIA Y CERRAJERIA
02.12.04.01 PUERTA DE MADERA CON ALAMBRE SE PUAS S/DISEÑO und 1.00 681.18 681.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 681.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 681.18 0.00 Metrado PPTO. 100.00%
02.12.05 PINTURA
02.12.05.01 PINTADO DE PUERTAS METALICAS LAC (2 MANOS ANTIC.+2 ESMALTE) m2 6.66 8.64 57.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.66 57.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.66 57.54 0.00 Metrado PPTO. 100.00%
02.12.06 CERCO DE ALAMBRE DE PUAS
02.12.06.01 POSTE DE CONCRETO F'C= 175 KG/CM2 und 20.00 323.55 6,471.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 6,471.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 6,471.00 0.00 Metrado PPTO. 100.00%
02.12.06.02 SUMINISTRO E INSTALACION DE ALAMBRE DE PUAS m 40.00 14.10 564.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 564.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 564.00 0.00 Metrado PPTO. 100.00%
03 CONSTRUCCION DE RESERVORIO LAGUNAS V= 11 M3 _x000D_
03.01 OBRAS PRELIMINARES
03.01.01 LIMPIEZA Y ACONDICIOMIENTO DEL TERRENO m2 10.75 4.16 44.72 0.00 10.75 44.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.75 44.72 0.00 Metrado PPTO. 100.00%
03.01.02 TRAZO Y REPLANTEO INICIAL DEL PROYECTO, PARA EDIFICACIÓN CON ESTACIÓN TO m2 10.75 1.04 11.18 0.00 10.75 11.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.75 11.18 0.00 Metrado PPTO. 100.00%
03.01.03 REPLANTEO FINAL DE LA OBRA CON ESTACIÓN TOTAL m2 10.75 0.60 6.45 0.00 0.00 0.00 0.00 0.00 10.75 6.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.75 6.45 0.00 Metrado PPTO. 100.00%
03.01.04 TRANSPORTE DE MATERIALES, HER-EQUIPOS EN ZONA SIN ACCESO VEHICULAR P/IN GLB 1.00 1,304.31 1,304.31 0.00 0.00 0.00 0.00 0.00 1.00 1,304.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,304.31 0.00 Metrado PPTO. 100.00%
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACIONES TERRENO SEMI ROCOSO C/EQUIPO, HASTA 3.00 M PROF.(SIN EMPL m3 164.44 79.76 13,115.73 0.00 32.89 2,623.31 0.00 0.00 0.00 131.55 10,492.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 164.44 13,115.74 0.00 Metrado PPTO. 100.00%
03.02.02 RELLENO COMPACTADO EN TERRENO SEMIROCOSO A PULSO, CON MATERIAL PROP m3 140.61 21.66 3,045.61 0.00 0.00 0.00 0.00 0.00 140.61 3,045.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 140.61 3,045.61 0.00 Metrado PPTO. 100.00%
03.02.03 RELLENO COMPACTADO MANUAL CON MATERIAL MEZCLA COMPACTADA (OVER+H m3 2.15 119.55 257.03 0.00 0.00 0.00 0.00 0.00 2.15 257.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.15 257.03 0.00 Metrado PPTO. 100.00%
03.02.04 RELLENO COMPACTADO CON MATERIAL DE PRÉSTAMO AFIRMADO (INCL. PROVISIÓ m3 2.05 119.06 244.07 0.00 0.00 0.00 0.00 0.00 2.05 244.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.05 244.07 0.00 Metrado PPTO. 100.00%
03.02.05 REFINE, NIVELACIÓN Y COMPACTACIÓN EN TERRENO SEMI ROCOSO m2 100.00 2.63 263.00 0.00 0.00 0.00 0.00 0.00 100.00 263.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 263.00 0.00 Metrado PPTO. 100.00%
03.02.06 ELIMINAC. DE MATERIAL EXCEDENTE T. SEMI ROCOSO DP=100M A PULSO M3. 27.10 31.54 854.73 0.00 4.07 128.37 0.00 0.00 0.00 23.03 726.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27.10 854.74 0.00 Metrado PPTO. 100.00%
03.03 OBRAS DE CONCRETO SIMPLE
03.03.01 CONCRETO F'C= 100KG/CM2 P/SOLADOS Y/O SUB BASES m3 0.54 332.75 179.69 0.00 0.00 0.00 0.00 0.00 0.54 179.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.54 179.69 0.00 Metrado PPTO. 100.00%
03.04 OBRAS DE CONCRETO ARMADO
03.04.01 CONCRETO F'C=210 KG/CM2 P/LOSA DE FONDO-PISO m3 2.15 442.78 951.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.15 951.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.15 951.98 0.00 Metrado PPTO. 100.00%
03.04.02 ACERO ESTRUC. TRABAJADO P/LOSA DE FONDO (COSTO PROM. INCL. DESPERDICIOS kg 201.69 4.15 837.01 0.00 0.00 0.00 100.85 418.51 0.00 0.00 0.00 100.85 418.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 201.69 837.02 0.00 Metrado PPTO. 100.00%
03.04.03 CONCRETO F'C= 210 KG/CM2 P/MUROS REFORZADOS m3 2.89 493.25 1,425.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.89 1,425.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.89 1,425.49 0.00 Metrado PPTO. 100.00%
03.04.04 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA MUROS RECTOS m2 38.59 57.66 2,225.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.59 2,225.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.59 2,225.10 0.00 Metrado PPTO. 100.00%
03.04.05 ACERO ESTRUC. TRABAJADO P/MURO (COSTO PROM. INCL. DESPERDICIOS) kg 158.21 4.26 673.97 0.00 0.00 0.00 79.11 336.99 0.00 0.00 0.00 79.11 336.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 158.21 673.98 0.00 Metrado PPTO. 100.00%
03.04.06 ACERO MALLA HEXAGONAL DE 5/8"_x000D_ m2 33.52 28.29 948.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.52 948.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.52 948.28 0.00 Metrado PPTO. 100.00%
03.04.07 CONCRETO F'C=210 KG/CM2 EN LOSAS MACIZAS m3 0.48 446.10 214.13 0.00 0.00 0.00 0.00 0.00 0.00 0.48 214.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.48 214.13 0.00 Metrado PPTO. 100.00%
03.04.08 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA LOSAS MACIZAS m2 8.34 58.02 483.89 0.00 0.00 0.00 0.00 0.00 0.00 8.34 483.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.34 483.89 0.00 Metrado PPTO. 100.00%
03.04.09 ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS kg 155.39 4.26 661.96 0.00 0.00 0.00 77.70 330.98 0.00 0.00 0.00 77.70 330.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 155.39 661.96 0.00 Metrado PPTO. 100.00%
03.05 REVOQUES, ENLUCIDOS Y MOLDURAS
03.05.01 TARRAJEO C/IMPERMEABILIZANTE MUROS P/RESERVORIO APOYADO E=20MM C:A 1 m2 18.38 39.79 731.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.38 731.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.38 731.34 0.00 Metrado PPTO. 100.00%
03.05.02 TARRAJEO C/IMPERMEABILIZANTE LOSA FONDO-PISO, RESERVORIO E=20MM C:A 1: m2 7.07 32.05 226.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.07 226.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.07 226.59 0.00 Metrado PPTO. 100.00%
03.06 CARPINTERIA METALICA Y HERRERIA
03.06.01 ESCALERA GATO EMPOTRADA DE ALUMINIO m 7.30 80.92 590.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.30 590.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.30 590.72 0.00 Metrado PPTO. 100.00%
03.06.02 TAPA METALICA TIPO T-3 C/PLANCHA ESTRIADA E=1/8" m2 0.36 378.93 136.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.36 136.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.36 136.41 0.00 Metrado PPTO. 100.00%
03.06.03 VENTILACION C/TUBERIA DE ACERO S/DISEÑO DE 2" und 1.00 59.40 59.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 59.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 59.40 0.00 Metrado PPTO. 100.00%
03.07 PINTURA
03.07.01 PINTADO EXTERIOR C/TEKNOMATE O SIMILAR DE RESERVORIO APOYADO INCL. ME m2 22.45 9.67 217.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.45 217.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.45 217.09 0.00 Metrado PPTO. 100.00%
03.08 ADITAMENTOS VARIOS
03.08.01 PROVISION Y COLOCACION DE JUNTA WATER STOP DE PVC E=4" m 16.65 15.22 253.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.65 253.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.65 253.41 0.00 Metrado PPTO. 100.00%
03.08.02 PROVISION Y COLOCADO DE TECNOPORT DE 1" m2 0.10 17.93 1.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 1.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 1.79 0.00 Metrado PPTO. 100.00%
03.09 PRUEBAS DE CALIDAD
03.09.01 PRUEBA HIDRÁULICA CON EMPLEO DE CISTERNA Y EQUIPO DE BOMBEO PARA EL LL m3 11.00 31.93 351.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.00 351.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.00 351.23 0.00 Metrado PPTO. 100.00%
03.09.02 EVACUACION AGUA DE PRUEBA C/EMPLEO DE LINEA DE SALIDA m3 11.00 0.98 10.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.00 10.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.00 10.78 0.00 Metrado PPTO. 100.00%
03.09.03 LIMPIEZA Y DESINFECCION DE RESERVORIOS APOYADOS m2 19.95 2.85 56.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.95 56.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.95 56.86 0.00 Metrado PPTO. 100.00%
03.10 CONSTRUCCION DE CASETA DE VALVULAS
03.10.01 OBRAS PRELIMINARES
03.10.01.01 TRAZO Y REPLANTEO INICIALES m2 0.75 1.35 1.01 0.00 0.75 1.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 1.01 0.00 Metrado PPTO. 100.00%
03.10.01.02 TRAZO Y REPLANTEO FINALES m2 0.75 1.02 0.77 0.00 0.00 0.00 0.00 0.00 0.00 0.75 0.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 0.77 0.00 Metrado PPTO. 100.00%
03.10.02 MOVIMIENTO DE TIERRAS
03.10.02.01 EXCAVACIONES TERRENO SEMI ROCOSO C/EQUIPO, HASTA 3.00 M PROF.(SIN EM m3 1.01 79.76 80.56 0.00 0.20 15.95 0.00 0.00 0.00 0.00 0.81 64.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.01 80.56 0.00 Metrado PPTO. 100.00%
03.10.02.02 REFINE, NIVELACIÓN Y COMPACTACIÓN EN TERRENO SEMI ROCOSO m2 0.75 2.63 1.97 0.00 0.08 0.21 0.00 0.00 0.00 0.00 0.67 1.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 1.97 0.00 Metrado PPTO. 100.00%
03.10.02.03 ELIMINAC. DE MATERIAL EXCEDENTE T. SEMI ROCOSO DP=100M A PULSO M3. 1.27 31.54 40.06 0.00 0.19 5.99 0.00 0.00 0.00 0.00 1.08 34.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.27 40.05 0.00 Metrado PPTO. 99.98%
03.10.03 OBRAS DE CONCRETO SIMPLE_x000D_
03.10.03.01 CONCRETO F'C= 100KG/CM2 P/SOLADOS Y/O SUB BASES m3 0.04 332.75 13.31 0.00 0.00 0.00 0.00 0.00 0.00 0.04 13.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 13.31 0.00 Metrado PPTO. 100.00%
03.10.04 OBRAS DE CONCRETO ARMADO
03.10.04.01 CONCRETO F'C=210 KG/CM2 P/LOSA DE FONDO-PISO m3 0.08 442.78 35.42 0.00 0.00 0.00 0.00 0.00 0.00 0.08 35.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.08 35.42 0.00 Metrado PPTO. 100.00%
03.10.04.02 ACERO ESTRUC. TRABAJADO P/LOSA DE FONDO (COSTO PROM. INCL. DESPERDICIO kg 5.32 4.15 22.08 0.00 0.00 0.00 0.00 0.00 0.00 5.32 22.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.32 22.08 0.00 Metrado PPTO. 100.00%
03.10.04.03 CONCRETO F'C= 210 KG/CM2 P/MUROS REFORZADOS m3 0.24 493.25 118.38 0.00 0.00 0.00 0.00 0.00 0.00 0.24 118.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.24 118.38 0.00 Metrado PPTO. 100.00%
03.10.04.04 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA MUROS RECTOS m2 4.92 57.66 283.69 0.00 0.00 0.00 0.00 0.00 0.00 4.92 283.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.92 283.69 0.00 Metrado PPTO. 100.00%
03.10.04.05 ACERO ESTRUC. TRABAJADO P/MURO (COSTO PROM. INCL. DESPERDICIOS) kg 11.17 4.26 47.58 0.00 0.00 0.00 0.00 0.00 0.00 11.17 47.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.17 47.58 0.00 Metrado PPTO. 100.00%
03.10.05 REVOQUES, ENLUCIDOS Y MOLDURAS
03.10.05.01 TARRAJEO CON IMPERMEABILIZANTE DE MUROS EN CAJA DE VALVULA m2 4.82 39.79 191.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.82 191.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.82 191.79 0.00 Metrado PPTO. 100.00%
03.10.06 CARPINTERIA METALICA Y HERRERIA
03.10.06.01 TAPA METALICA SANITARIA C/PLANCHA ESTRIADA E=1/4" m2 1.00 794.17 794.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 794.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 794.17 0.00 Metrado PPTO. 100.00%
03.10.07 EQUIPAMIENTO HIDRAULICO
03.10.07.01 CANASTILLA DE PVC DE 4" A 3" und 1.00 62.40 62.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 62.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 62.40 0.00 Metrado PPTO. 100.00%
03.10.07.02 UNION PVC SP Ø 3"_x000D_ und 1.00 11.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 11.00 0.00 Metrado PPTO. 100.00%
03.10.07.03 UNION UNIVERSAL PVC SP Ø 2"_x000D_ und 6.00 32.00 192.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 192.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 192.00 0.00 Metrado PPTO. 100.00%
03.10.07.04 ADAPTADOR PVC SP Ø 2"_x000D_ und 6.00 7.35 44.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 44.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 44.10 0.00 Metrado PPTO. 100.00%
03.10.07.05 VALVULA DE BRONCE ROSCADA Ø 2"_x000D_ und 3.00 91.53 274.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 274.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 274.59 0.00 Metrado PPTO. 100.00%
03.10.07.06 CONO DE REBOSE PVC SP Ø 2"_x000D_ und 1.00 12.80 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 12.80 0.00 Metrado PPTO. 100.00%
03.10.07.07 CODO 90º PVC SP Ø 2"_x000D_ und 5.00 8.20 41.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 41.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 41.00 0.00 Metrado PPTO. 100.00%
03.10.07.08 TEE PVC SP Ø 2"_x000D_ und 4.00 9.50 38.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 38.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 38.00 0.00 Metrado PPTO. 100.00%
03.10.07.09 VALVULA FLOTADORA Ø2" und 1.00 211.90 211.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 211.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 211.90 0.00 Metrado PPTO. 100.00%
03.10.07.10 TAPON MACHO SP PVC Ø 2"_x000D_ und 2.00 6.02 12.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 12.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 12.04 0.00 Metrado PPTO. 100.00%
03.10.07.11 TEE PVC Ø 3" A 2" und 1.00 30.54 30.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 30.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 30.54 0.00 Metrado PPTO. 100.00%
03.10.07.12 UNION UNIVERSAL PVC SP Ø 3"_x000D_ und 2.00 62.50 125.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 125.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 125.00 0.00 Metrado PPTO. 100.00%
03.10.07.13 ADAPTADOR PVC SP Ø 3"_x000D_ und 2.00 9.96 19.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 19.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 19.92 0.00 Metrado PPTO. 100.00%
03.10.07.14 VALVULA DE BRONCE ROSCADA Ø 3"_x000D_ und 1.00 156.80 156.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 156.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 156.80 0.00 Metrado PPTO. 100.00%
03.10.07.15 HIPOCLORADOR_x000D_ und 1.00 110.00 110.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 110.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 110.00 0.00 Metrado PPTO. 100.00%
03.10.07.16 TUBERIA PVS SP Ø 2" I/ELEM DE UNION + 2% DESP_x000D_ m 9.23 16.29 150.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.23 150.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.23 150.36 0.00 Metrado PPTO. 100.00%
03.10.07.17 TUBERIA PVS SP Ø 3" I/ELEM DE UNION + 2% DESP_x000D_ m 2.04 29.39 59.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.04 59.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.04 59.96 0.00 Metrado PPTO. 100.00%
03.10.07.18 CODO FIERRO GALVANIZADO Ø2" und 2.00 7.05 14.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 14.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 14.10 0.00 Metrado PPTO. 100.00%
03.10.07.19 TUBERIA Fº Gº Ø 2 1/2" I/ELEM DE UNION + 2% DESP_x000D_ m 0.41 16.60 6.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.41 6.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.41 6.81 0.00 Metrado PPTO. 100.00%
03.10.08 INSTALACION
03.10.08.01 MONTAJE DE INSTALACIÓN HIDRÁULICA DE RESERVORIO LAGUNAS V=11M3 GLB 1.00 846.39 846.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 846.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 846.39 0.00 Metrado PPTO. 100.00%
03.11 CERCO PERIMETRICO INCL. PUERTA DE INGRESO
03.11.01 OBRAS PRELIMINARES
03.11.01.01 TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACIO KM 0.04 391.63 15.67 0.00 0.04 15.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 15.67 0.00 Metrado PPTO. 100.00%
03.11.01.02 REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL KM 0.04 127.78 5.11 0.00 0.00 0.00 0.00 0.00 0.00 0.04 5.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 5.11 0.00 Metrado PPTO. 100.00%
03.11.01.03 LIMPIEZA DE TERRENO MANUAL m2 80.00 3.65 292.00 0.00 0.00 0.00 0.00 0.00 0.00 80.00 292.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 80.00 292.00 0.00 Metrado PPTO. 100.00%
03.11.02 MOVIMIENTO DE TIERRAS
03.11.02.01 EXCAVACION MANUAL T. SEMI ROCOSO HASTA H=0,60M m3 1.92 61.17 117.45 0.00 0.00 0.00 0.00 0.00 0.00 1.92 117.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.92 117.45 0.00 Metrado PPTO. 100.00%
03.11.02.02 ELIMINAC. DE MATERIAL EXCEDENTE T. SEMI ROCOSO DP=100M A PULSO M3. 2.40 31.54 75.70 0.00 0.00 0.00 0.00 0.00 0.00 2.40 75.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.40 75.70 0.00 Metrado PPTO. 100.00%
03.11.03 OBRAS DE CONCRETO
03.11.03.01 CONCRETO F'C 140 KG/CM2 P/CIMIENTO CORRIDO (CEMENTO MS) m3 1.28 410.37 525.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.28 525.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.28 525.27 0.00 Metrado PPTO. 100.00%
03.11.04 CARPINTERIA Y CERRAJERIA
03.11.04.01 PUERTA DE MADERA CON ALAMBRE SE PUAS S/DISEÑO und 1.00 681.18 681.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 681.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 681.18 0.00 Metrado PPTO. 100.00%
03.11.05 PINTURA
03.11.05.01 PINTADO DE PUERTAS METALICAS LAC (2 MANOS ANTIC.+2 ESMALTE) m2 6.66 8.64 57.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.66 57.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.66 57.54 0.00 Metrado PPTO. 100.00%
03.11.06 CERCO DE ALAMBRE DE PUAS
03.11.06.01 POSTE DE CONCRETO F'C= 175 KG/CM2 und 20.00 323.55 6,471.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 6,471.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 6,471.00 0.00 Metrado PPTO. 100.00%
03.11.06.02 SUMINISTRO E INSTALACION DE ALAMBRE DE PUAS m 40.00 14.10 564.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 564.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 564.00 0.00 Metrado PPTO. 100.00%
04 CONSTRUCCION DE RESERVORIO - AGUPAMPA V= 12 M3 _x000D_
04.01 OBRAS PRELIMINARES
04.01.01 LIMPIEZA Y ACONDICIOMIENTO DEL TERRENO m2 10.75 4.16 44.72 0.00 10.75 44.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.75 44.72 0.00 Metrado PPTO. 100.00%
04.01.02 TRAZO Y REPLANTEO INICIAL DEL PROYECTO, PARA EDIFICACIÓN CON ESTACIÓN TO m2 10.75 1.04 11.18 0.00 10.75 11.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.75 11.18 0.00 Metrado PPTO. 100.00%
04.01.03 REPLANTEO FINAL DE LA OBRA CON ESTACIÓN TOTAL m2 10.75 0.60 6.45 0.00 0.00 0.00 0.00 0.00 10.75 6.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.75 6.45 0.00 Metrado PPTO. 100.00%
04.01.04 TRANSPORTE DE MATERIALES, HER-EQUIPOS EN ZONA SIN ACCESO VEHICULAR P/IN GLB 1.00 1,278.65 1,278.65 0.00 0.00 0.00 0.00 0.00 1.00 1,278.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,278.65 0.00 Metrado PPTO. 100.00%
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACIONES TERRENO SEMI ROCOSO C/EQUIPO, HASTA 3.00 M PROF.(SIN EMPL m3 95.00 79.76 7,577.20 0.00 19.00 1,515.44 0.00 0.00 0.00 76.00 6,061.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 95.00 7,577.20 0.00 Metrado PPTO. 100.00%
04.02.02 RELLENO COMPACTADO EN TERRENO SEMIROCOSO A PULSO, CON MATERIAL PROP m3 85.00 21.66 1,841.10 0.00 0.00 0.00 0.00 0.00 85.00 1,841.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 85.00 1,841.10 0.00 Metrado PPTO. 100.00%
04.02.03 RELLENO COMPACTADO MANUAL CON MATERIAL MEZCLA COMPACTADA (OVER+H m3 2.15 119.55 257.03 0.00 0.00 0.00 0.00 0.00 2.15 257.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.15 257.03 0.00 Metrado PPTO. 100.00%
04.02.04 RELLENO COMPACTADO CON MATERIAL DE PRÉSTAMO AFIRMADO (INCL. PROVISIÓ m3 2.05 119.06 244.07 0.00 0.00 0.00 0.00 0.00 2.05 244.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.05 244.07 0.00 Metrado PPTO. 100.00%
RESUMEN DE METRADOS
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
“INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PIURA
OBRA
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88 F.R. =
CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S.
CONTRATISTA CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL
MORROPON HUANCABAMBA (GR)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
RESUMEN DE METRADOS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 TOTAL METRADO SALDO DE Porcentaje de
VALORIZADO TOTAL METRADO Control de Metrados Avance
VALORIZACIÓN N° 01 VALORIZACIÓN N° 02 VALORIZACIÓN N° 03 VALORIZACIÓN N° 04 VALORIZACIÓN N° 05 VALORIZACIÓN N° 06 VALORIZACIÓN N° 07 VALORIZACIÓN N° 08 VALORIZACIÓN N° 09 VALORIZACIÓN N° 10 VALORIZACIÓN N° 11 VALORIZACIÓN N° 12 VALORIZACIÓN N° 13 VALORIZACIÓN N° 14 VALORIZACIÓN N° 15 VALORIZACIÓN N° 16 VALORIZACIÓN N° 17 VALORIZACIÓN N° 18 VALORIZACIÓN N° 19 VALORIZACIÓN N° 20 PRESUPUESTO
Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/.
04.02.05 REFINE, NIVELACIÓN Y COMPACTACIÓN EN TERRENO SEMI ROCOSO m2 100.00 2.63 263.00 0.00 0.00 0.00 0.00 0.00 100.00 263.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 263.00 0.00 Metrado PPTO. 100.00%
04.02.06 ELIMINAC. DE MATERIAL EXCEDENTE T. SEMI ROCOSO DP=100M A PULSO M3. 21.50 31.54 678.11 0.00 2.15 67.81 0.00 0.00 0.00 19.35 610.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.50 678.11 0.00 Metrado PPTO. 100.00%
04.03 OBRAS DE CONCRETO SIMPLE
04.03.01 CONCRETO F'C= 100KG/CM2 P/SOLADOS Y/O SUB BASES m3 0.54 332.75 179.69 0.00 0.00 0.00 0.00 0.00 0.54 179.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.54 179.69 0.00 Metrado PPTO. 100.00%
04.04 OBRAS DE CONCRETO ARMADO
04.04.01 CONCRETO F'C=210 KG/CM2 P/LOSA DE FONDO-PISO m3 2.15 442.78 951.98 0.00 0.00 0.00 0.00 0.00 2.15 951.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.15 951.98 0.00 Metrado PPTO. 100.00%
04.04.02 ACERO ESTRUC. TRABAJADO P/LOSA DE FONDO (COSTO PROM. INCL. DESPERDICIOS kg 201.69 4.15 837.01 0.00 0.00 0.00 100.8450 418.51 0.00 100.84 418.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.005 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 201.69 837.02 0.00 Metrado PPTO. 100.00%
04.04.03 CONCRETO F'C= 210 KG/CM2 P/MUROS REFORZADOS m3 3.19 493.25 1,573.47 0.00 0.00 0.00 0.00 0.00 3.19 1,573.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.19 1,573.47 0.00 Metrado PPTO. 100.00%
04.04.04 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA MUROS RECTOS m2 42.55 57.66 2,453.43 0.00 0.00 0.00 0.00 0.00 42.55 2,453.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.55 2,453.43 0.00 Metrado PPTO. 100.00%
04.04.05 ACERO ESTRUC. TRABAJADO P/MURO (COSTO PROM. INCL. DESPERDICIOS) kg 156.99 4.26 668.78 0.00 0.00 0.00 78.4950 334.39 0.00 78.49 334.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.005 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 156.99 668.78 0.00 Metrado PPTO. 100.00%
04.04.06 ACERO MALLA HEXAGONAL DE 5/8"_x000D_ m2 36.64 28.29 1,036.55 0.00 0.00 0.00 0.00 0.00 36.64 1,036.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.64 1,036.55 0.00 Metrado PPTO. 100.00%
04.04.07 CONCRETO F'C=210 KG/CM2 EN LOSAS MACIZAS m3 0.48 446.10 214.13 0.00 0.00 0.00 0.00 0.00 0.48 214.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.48 214.13 0.00 Metrado PPTO. 100.00%
04.04.08 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA LOSAS MACIZAS m2 8.42 58.02 488.53 0.00 0.00 0.00 0.00 0.00 8.42 488.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.42 488.53 0.00 Metrado PPTO. 100.00%
04.04.09 ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS kg 155.39 4.26 661.96 0.00 0.00 0.00 77.6950 330.98 0.00 77.69 330.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.005 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 155.39 661.96 0.00 Metrado PPTO. 100.00%
04.05 REVOQUES, ENLUCIDOS Y MOLDURAS
04.05.01 TARRAJEO C/IMPERMEABILIZANTE MUROS P/RESERVORIO APOYADO E=20MM C:A 1 m2 20.26 39.79 806.15 0.00 0.00 0.00 0.00 0.00 20.26 806.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.26 806.15 0.00 Metrado PPTO. 100.00%
04.05.02 TARRAJEO C/IMPERMEABILIZANTE LOSA FONDO-PISO, RESERVORIO E=20MM C:A 1: m2 7.07 32.05 226.59 0.00 0.00 0.00 0.00 0.00 7.07 226.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.07 226.59 0.00 Metrado PPTO. 100.00%
04.06 CARPINTERIA METALICA Y HERRERIA
04.06.01 ESCALERA GATO EMPOTRADA DE ALUMINIO m 7.70 80.92 623.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.70 623.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.70 623.08 0.00 Metrado PPTO. 100.00%
04.06.02 TAPA METALICA TIPO T-3 C/PLANCHA ESTRIADA E=1/8" m2 0.36 378.93 136.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.36 136.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.36 136.41 0.00 Metrado PPTO. 100.00%
04.06.03 VENTILACION C/TUBERIA DE ACERO S/DISEÑO DE 2" und 1.00 59.40 59.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 59.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 59.40 0.00 Metrado PPTO. 100.00%
04.07 PINTURA
04.07.01 PINTADO EXTERIOR C/TEKNOMATE O SIMILAR DE RESERVORIO APOYADO INCL. ME m2 22.61 9.67 218.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.61 218.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.61 218.64 0.00 Metrado PPTO. 100.00%
04.08 ADITAMENTOS VARIOS
04.08.01 PROVISION Y COLOCACION DE JUNTA WATER STOP DE PVC E=4" m 19.79 15.22 301.20 0.00 0.00 0.00 0.00 0.00 19.79 301.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.79 301.20 0.00 Metrado PPTO. 100.00%
04.08.02 PROVISION Y COLOCADO DE TECNOPORT DE 1" m2 0.10 17.93 1.79 0.00 0.00 0.00 0.00 0.00 0.10 1.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 1.79 0.00 Metrado PPTO. 100.00%
04.09 PRUEBAS DE CALIDAD
04.09.01 PRUEBA HIDRÁULICA CON EMPLEO DE CISTERNA Y EQUIPO DE BOMBEO PARA EL LL m3 12.00 31.93 383.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 383.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 383.16 0.00 Metrado PPTO. 100.00%
04.09.02 EVACUACION AGUA DE PRUEBA C/EMPLEO DE LINEA DE SALIDA m3 12.00 0.98 11.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 11.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 11.76 0.00 Metrado PPTO. 100.00%
04.09.03 LIMPIEZA Y DESINFECCION DE RESERVORIOS APOYADOS m2 20.65 2.85 58.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.65 58.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.65 58.85 0.00 Metrado PPTO. 100.00%
04.10 CONSTRUCCION DE CASETA DE VALVULAS
04.10.01 OBRAS PRELIMINARES
04.10.01.01 TRAZO Y REPLANTEO INICIALES m2 0.75 1.35 1.01 0.00 0.75 1.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 1.01 0.00 Metrado PPTO. 100.00%
04.10.01.02 TRAZO Y REPLANTEO FINALES m2 0.75 1.02 0.77 0.00 0.00 0.00 0.00 0.00 0.00 0.75 0.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 0.77 0.00 Metrado PPTO. 100.00%
04.10.02 MOVIMIENTO DE TIERRAS
04.10.02.01 EXCAVACIONES TERRENO SEMI ROCOSO C/EQUIPO, HASTA 3.00 M PROF.(SIN EM m3 1.01 79.76 80.56 0.00 0.00 0.00 0.00 0.00 0.00 1.01 80.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.01 80.56 0.00 Metrado PPTO. 100.00%
04.10.02.02 REFINE, NIVELACIÓN Y COMPACTACIÓN EN TERRENO SEMI ROCOSO m2 0.75 2.63 1.97 0.00 0.00 0.00 0.00 0.00 0.00 0.75 1.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 1.97 0.00 Metrado PPTO. 100.00%
04.10.02.03 RELLENO COMPACTADO MANUAL CON MATERIAL MEZCLA COMPACTADA (OVER m3 0.15 119.55 17.93 0.00 0.00 0.00 0.00 0.00 0.00 0.15 17.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.15 17.93 0.00 Metrado PPTO. 100.00%
04.10.02.04 RELLENO COMPACTADO CON MATERIAL DE PRÉSTAMO AFIRMADO (INCL. PROVISI m3 0.11 119.06 13.10 0.00 0.00 0.00 0.00 0.00 0.00 0.11 13.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.11 13.10 0.00 Metrado PPTO. 100.00%
04.10.02.05 ELIMINAC. DE MATERIAL EXCEDENTE T. SEMI ROCOSO DP=100M A PULSO M3. 1.27 31.54 40.06 0.00 0.00 0.00 0.00 0.00 0.00 1.27 40.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.27 40.06 0.00 Metrado PPTO. 100.00%
04.10.03 OBRAS DE CONCRETO SIMPLE_x000D_
04.10.03.01 CONCRETO F'C= 100KG/CM2 P/SOLADOS Y/O SUB BASES m3 0.04 332.75 13.31 0.00 0.00 0.00 0.00 0.00 0.00 0.04 13.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 13.31 0.00 Metrado PPTO. 100.00%
04.10.04 OBRAS DE CONCRETO ARMADO
04.10.04.01 CONCRETO F'C=210 KG/CM2 P/LOSA DE FONDO-PISO m3 0.08 442.78 35.42 0.00 0.00 0.00 0.00 0.00 0.00 0.08 35.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.08 35.42 0.00 Metrado PPTO. 100.00%
04.10.04.02 ACERO ESTRUC. TRABAJADO P/LOSA DE FONDO (COSTO PROM. INCL. DESPERDICIO kg 5.32 4.15 22.08 0.00 0.00 0.00 0.00 0.00 0.00 5.32 22.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.32 22.08 0.00 Metrado PPTO. 100.00%
04.10.04.03 CONCRETO F'C= 210 KG/CM2 P/MUROS REFORZADOS m3 0.24 493.25 118.38 0.00 0.00 0.00 0.00 0.00 0.00 0.24 118.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.24 118.38 0.00 Metrado PPTO. 100.00%
04.10.04.04 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA MUROS RECTOS m2 4.92 57.66 283.69 0.00 0.00 0.00 0.00 0.00 0.00 4.92 283.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.92 283.69 0.00 Metrado PPTO. 100.00%
04.10.04.05 ACERO ESTRUC. TRABAJADO P/MURO (COSTO PROM. INCL. DESPERDICIOS) kg 10.39 4.26 44.26 0.00 0.00 0.00 0.00 0.00 0.00 10.39 44.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.39 44.26 0.00 Metrado PPTO. 100.00%
04.10.05 REVOQUES, ENLUCIDOS Y MOLDURAS
04.10.05.01 TARRAJEO CON IMPERMEABILIZANTE DE MUROS EN CAJA DE VALVULA m2 4.82 39.79 191.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.82 191.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.82 191.79 0.00 Metrado PPTO. 100.00%
04.10.06 CARPINTERIA METALICA Y HERRERIA
04.10.06.01 TAPA METALICA SANITARIA C/PLANCHA ESTRIADA E=1/4" m2 1.00 794.17 794.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 794.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 794.17 0.00 Metrado PPTO. 100.00%
04.11 EQUIPAMIENTO HIDRAULICO
04.11.01 CANASTILLA DE PVC DE 3" A 2 1/2" und 1.00 56.20 56.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 56.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 56.20 0.00 Metrado PPTO. 100.00%
04.11.02 UNION PVC SP Ø 2 1/2"_x000D_ und 1.00 8.90 8.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.90 0.00 Metrado PPTO. 100.00%
04.11.03 UNION UNIVERSAL PVC SP Ø 2"_x000D_ und 6.00 32.00 192.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 192.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 192.00 0.00 Metrado PPTO. 100.00%
04.11.04 ADAPTADOR PVC SP Ø 2"_x000D_ und 6.00 7.35 44.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 44.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 44.10 0.00 Metrado PPTO. 100.00%
04.11.05 VALVULA DE BRONCE ROSCADA Ø 2"_x000D_ und 3.00 91.53 274.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 274.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 274.59 0.00 Metrado PPTO. 100.00%
04.11.06 CONO DE REBOSE PVC SP Ø 2"_x000D_ und 1.00 12.80 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 12.80 0.00 Metrado PPTO. 100.00%
04.11.07 CODO 90º PVC SP Ø 2"_x000D_ und 5.00 8.20 41.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 41.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 41.00 0.00 Metrado PPTO. 100.00%
RESUMEN DE METRADOS
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
“INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PIURA
OBRA
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88 F.R. =
CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S.
CONTRATISTA CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL
MORROPON HUANCABAMBA (GR)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
RESUMEN DE METRADOS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 SALDO DE
TOTAL METRADO TOTAL METRADO Control de Metrados Porcentaje de
VALORIZADO Avance
VALORIZACIÓN N° 01 VALORIZACIÓN N° 02 VALORIZACIÓN N° 03 VALORIZACIÓN N° 04 VALORIZACIÓN N° 05 VALORIZACIÓN N° 06 VALORIZACIÓN N° 07 VALORIZACIÓN N° 08 VALORIZACIÓN N° 09 VALORIZACIÓN N° 10 VALORIZACIÓN N° 11 VALORIZACIÓN N° 12 VALORIZACIÓN N° 13 VALORIZACIÓN N° 14 VALORIZACIÓN N° 15 VALORIZACIÓN N° 16 VALORIZACIÓN N° 17 VALORIZACIÓN N° 18 VALORIZACIÓN N° 19 VALORIZACIÓN N° 20 PRESUPUESTO
Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/.
04.11.08 TEE PVC SP Ø 2"_x000D_ und 4.00 9.50 38.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 38.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 38.00 0.00 Metrado PPTO. 100.00%
04.11.09 VALVULA FLOTADORA Ø2" und 1.00 211.90 211.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 211.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 211.90 0.00 Metrado PPTO. 100.00%
04.11.10 TAPON MACHO SP PVC Ø 2"_x000D_ und 2.00 6.02 12.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 12.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 12.04 0.00 Metrado PPTO. 100.00%
04.11.11 TEE PVC Ø 2 1/2" A 2" und 1.00 18.90 18.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 18.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 18.90 0.00 Metrado PPTO. 100.00%
04.11.12 UNION UNIVERSAL PVC SP Ø 2 1/2" und 2.00 42.00 84.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 84.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 84.00 0.00 Metrado PPTO. 100.00%
04.11.13 ADAPTADOR PVC SP Ø 2 1/2"_x000D_ und 2.00 8.31 16.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 16.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 16.62 0.00 Metrado PPTO. 100.00%
04.11.14 VALVULA DE BRONCE ROSCADA DE 2 1/2"_x000D_ und 1.00 91.53 91.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 91.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 91.53 0.00 Metrado PPTO. 100.00%
04.11.15 HIPOCLORADOR_x000D_ und 1.00 110.00 110.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 110.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 110.00 0.00 Metrado PPTO. 100.00%
04.11.16 TUBERIA PVS SP Ø 2" I/ELEM DE UNION + 2% DESP_x000D_ m 7.80 16.29 127.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.80 127.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.80 127.06 0.00 Metrado PPTO. 100.00%
04.11.17 TUBERIA PVC SP Ø 2 1/2" I/ELEM DE UNION + 2% DESP m 2.04 21.51 43.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.04 43.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.04 43.88 0.00 Metrado PPTO. 100.00%
04.11.18 CODO FIERRO GALVANIZADO Ø2" und 2.00 7.05 14.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 14.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 14.10 0.00 Metrado PPTO. 100.00%
04.11.19 TUBERIA Fº Gº Ø 2 1/2" I/ELEM DE UNION + 2% DESP_x000D_ m 0.41 16.60 6.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.41 6.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.41 6.81 0.00 Metrado PPTO. 100.00%
04.11.20 INSTALACION
04.11.20.01 MONTAJE DE INSTALACIÓN HIDRÁULICA DE RESERVORIO AGUPAMPA V=12M3 GLB 1.00 767.07 767.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 767.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 767.07 0.00 Metrado PPTO. 100.00%
04.12 CERCO PERIMETRICO INCL. PUERTA DE INGRESO
04.12.01 OBRAS PRELIMINARES
04.12.01.01 TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACIO KM 0.04 391.63 15.67 0.00 0.04 15.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 15.67 0.00 Metrado PPTO. 100.00%
04.12.01.02 REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL KM 0.04 127.78 5.11 0.00 0.00 0.00 0.00 0.00 0.00 0.04 5.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 5.11 0.00 Metrado PPTO. 100.00%
04.12.01.03 LIMPIEZA DE TERRENO MANUAL m2 80.00 3.65 292.00 0.00 0.00 0.00 0.00 0.00 0.00 80.00 292.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 80.00 292.00 0.00 Metrado PPTO. 100.00%
04.12.02 MOVIMIENTO DE TIERRAS
04.12.02.01 EXCAVACION MANUAL T. SEMI ROCOSO HASTA H=0,60M m3 1.92 61.17 117.45 0.00 0.00 0.00 0.00 0.00 0.00 1.92 117.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.92 117.45 0.00 Metrado PPTO. 100.00%
04.12.02.02 ELIMINAC. DE MATERIAL EXCEDENTE T. SEMI ROCOSO DP=100M A PULSO M3. 2.40 31.54 75.70 0.00 0.00 0.00 0.00 0.00 0.00 2.40 75.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.40 75.70 0.00 Metrado PPTO. 100.00%
04.12.03 OBRAS DE CONCRETO
04.12.03.01 CONCRETO F'C 140 KG/CM2 P/CIMIENTO CORRIDO (CEMENTO MS) m3 1.28 410.37 525.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.28 525.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.28 525.27 0.00 Metrado PPTO. 100.00%
04.12.04 CARPINTERIA Y CERRAJERIA
04.12.04.01 PUERTA DE MADERA CON ALAMBRE SE PUAS S/DISEÑO und 1.00 681.18 681.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 681.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 681.18 0.00 Metrado PPTO. 100.00%
04.12.05 PINTURA
04.12.05.01 PINTADO DE PUERTAS METALICAS LAC (2 MANOS ANTIC.+2 ESMALTE) m2 6.66 8.64 57.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.66 57.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.66 57.54 0.00 Metrado PPTO. 100.00%
04.12.06 CERCO DE ALAMBRE DE PUAS
04.12.06.01 POSTE DE CONCRETO F'C= 175 KG/CM2 und 20.00 323.55 6,471.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 6,471.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 6,471.00 0.00 Metrado PPTO. 100.00%
04.12.06.02 SUMINISTRO E INSTALACION DE ALAMBRE DE PUAS m 40.00 14.10 564.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 564.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 564.00 0.00 Metrado PPTO. 100.00%
05 MEJORAMIENTO RESERVORIO EXISTENTE - SHILCAYA (V=10M3).
05.01 OBRAS PRELIMINARES
05.01.01 LIMPIEZA Y ACONDICIOMIENTO DEL TERRENO m2 100.00 4.16 416.00 0.00 100.00 416.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -100.00 -416.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 Metrado PPTO. 0.00%
05.01.02 TRANSPORTE DE MATERIALES, HER-EQUIPOS EN ZONA SIN ACCESO VEHICULAR P/IN GLB 1.00 359.22 359.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
05.02 CARPINTERIA METALICA Y HERRERIA
05.02.01 ESCALERA GATO EMPOTRADA DE ALUMINIO m 7.70 80.92 623.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.70 Metrado PPTO. 0.00%
05.02.02 MANTENIMIENTO DE TAPAS METALICAS DE RESERV. EXISTENTE m2 0.36 186.83 67.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.36 Metrado PPTO. 0.00%
05.02.03 VENTILACION C/TUBERIA DE ACERO S/DISEÑO DE 2" und 1.00 59.40 59.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
05.03 PINTURA
05.03.01 PINTADO EXTERIOR C/TEKNOMATE O SIMILAR DE RESERVORIO APOYADO INCL. ME m2 18.16 9.67 175.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.16 Metrado PPTO. 0.00%
05.04 PRUEBAS DE CALIDAD
05.04.01 PRUEBA HIDRÁULICA CON EMPLEO DE CISTERNA Y EQUIPO DE BOMBEO PARA EL LL m3 10.00 31.93 319.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 Metrado PPTO. 0.00%
05.04.02 EVACUACION AGUA DE PRUEBA C/EMPLEO DE LINEA DE SALIDA m3 10.00 0.98 9.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 Metrado PPTO. 0.00%
05.04.03 LIMPIEZA Y DESINFECCION DE RESERVORIOS APOYADOS m2 16.82 2.85 47.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.82 Metrado PPTO. 0.00%
05.05 EQUIPAMIENTO HIDRAULICO
RESUMEN DE METRADOS
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
“INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PIURA
OBRA
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88 F.R. =
CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S.
CONTRATISTA CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL
MORROPON HUANCABAMBA (GR)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
RESUMEN DE METRADOS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 SALDO DE
TOTAL METRADO TOTAL METRADO Control de Metrados Porcentaje de
VALORIZADO Avance
VALORIZACIÓN N° 01 VALORIZACIÓN N° 02 VALORIZACIÓN N° 03 VALORIZACIÓN N° 04 VALORIZACIÓN N° 05 VALORIZACIÓN N° 06 VALORIZACIÓN N° 07 VALORIZACIÓN N° 08 VALORIZACIÓN N° 09 VALORIZACIÓN N° 10 VALORIZACIÓN N° 11 VALORIZACIÓN N° 12 VALORIZACIÓN N° 13 VALORIZACIÓN N° 14 VALORIZACIÓN N° 15 VALORIZACIÓN N° 16 VALORIZACIÓN N° 17 VALORIZACIÓN N° 18 VALORIZACIÓN N° 19 VALORIZACIÓN N° 20 PRESUPUESTO
Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/.
05.05.01 CANASTILLA DE PVC DE 3" A 2 1/2" und 1.00 56.20 56.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
05.05.02 UNION PVC SP Ø 2 1/2"_x000D_ und 1.00 8.90 8.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
05.05.03 UNION UNIVERSAL PVC SP Ø 2"_x000D_ und 6.00 32.00 192.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 Metrado PPTO. 0.00%
05.05.04 ADAPTADOR PVC SP Ø 2"_x000D_ und 6.00 7.35 44.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 Metrado PPTO. 0.00%
05.05.05 VALVULA DE BRONCE ROSCADA Ø 2"_x000D_ und 3.00 91.53 274.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 Metrado PPTO. 0.00%
05.05.06 CONO DE REBOSE PVC SP Ø 2"_x000D_ und 1.00 12.80 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
05.05.07 CODO 90º PVC SP Ø 2"_x000D_ und 5.00 8.20 41.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 Metrado PPTO. 0.00%
05.05.08 TEE PVC SP Ø 2"_x000D_ und 3.00 9.50 28.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 Metrado PPTO. 0.00%
05.05.09 VALVULA FLOTADORA Ø2" und 1.00 211.90 211.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
05.05.10 TAPON MACHO SP PVC Ø 2"_x000D_ und 2.00 6.02 12.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 Metrado PPTO. 0.00%
05.05.11 TEE PVC Ø 2 1/2" A 2" und 1.00 18.90 18.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
05.05.12 UNION UNIVERSAL PVC SP Ø 2 1/2" und 2.00 42.00 84.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 Metrado PPTO. 0.00%
05.05.13 ADAPTADOR PVC SP Ø 2 1/2"_x000D_ und 2.00 8.31 16.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 Metrado PPTO. 0.00%
05.05.14 VALVULA DE BRONCE ROSCADA DE 2 1/2"_x000D_ und 1.00 91.53 91.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
05.05.15 HIPOCLORADOR_x000D_ und 1.00 110.00 110.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
05.05.16 TUBERIA PVS SP Ø 2" I/ELEM DE UNION + 2% DESP_x000D_ m 7.80 16.29 127.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.80 Metrado PPTO. 0.00%
05.05.17 TUBERIA PVC SP Ø 2 1/2" I/ELEM DE UNION + 2% DESP m 2.04 21.51 43.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.04 Metrado PPTO. 0.00%
05.05.18 CODO FIERRO GALVANIZADO Ø2" und 2.00 7.05 14.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 Metrado PPTO. 0.00%
05.05.19 TUBERIA Fº Gº Ø 2 1/2" I/ELEM DE UNION + 2% DESP_x000D_ m 0.41 16.60 6.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.41 Metrado PPTO. 0.00%
05.05.20 INSTALACION
05.05.20.01 MONTAJE DE INSTALACIÓN HIDRÁULICA DE RESERVORIO SHILCAYA V=10M3 GLB 1.00 407.03 407.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
05.06 CERCO PERIMETRICO INCL. PUERTA DE INGRESO
05.06.01 OBRAS PRELIMINARES
05.06.01.01 TRAZOS Y REPLANTEOS INICIAL DEL PROYECTO PARA LINEAS-REDES CON ESTACIO KM 0.04 391.63 15.67 0.00 0.04 15.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -0.04 -15.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 Metrado PPTO. 0.00%
05.06.01.02 REPLANTEO FINAL DE LA OBRA PARA LINEAS REDES CON ESTACION TOTAL KM 0.04 127.78 5.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 Metrado PPTO. 0.00%
05.06.01.03 LIMPIEZA DE TERRENO MANUAL m2 80.00 3.65 292.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 80.00 Metrado PPTO. 0.00%
05.06.02 MOVIMIENTO DE TIERRAS
05.06.02.01 EXCAVACION MANUAL T. SEMI ROCOSO HASTA H=0,60M m3 1.92 61.17 117.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.92 Metrado PPTO. 0.00%
05.06.02.02 ELIMINAC. DE MATERIAL EXCEDENTE T. SEMI ROCOSO DP=100M A PULSO M3. 2.40 31.54 75.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.40 Metrado PPTO. 0.00%
05.06.03 OBRAS DE CONCRETO
05.06.03.01 CONCRETO F'C 140 KG/CM2 P/CIMIENTO CORRIDO (CEMENTO MS) m3 1.28 410.37 525.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.28 Metrado PPTO. 0.00%
05.06.04 CARPINTERIA Y CERRAJERIA
05.06.04.01 PUERTA DE MADERA CON ALAMBRE SE PUAS S/DISEÑO und 1.00 681.18 681.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 Metrado PPTO. 0.00%
05.06.05 PINTURA
05.06.05.01 PINTADO DE PUERTAS METALICAS LAC (2 MANOS ANTIC.+2 ESMALTE) m2 6.66 8.64 57.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.66 Metrado PPTO. 0.00%
05.06.06 CERCO DE ALAMBRE DE PUAS
05.06.06.01 POSTE DE CONCRETO F'C= 175 KG/CM2 und 20.00 323.55 6,471.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 Metrado PPTO. 0.00%
05.06.06.02 SUMINISTRO E INSTALACION DE ALAMBRE DE PUAS m 40.00 14.10 564.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 Metrado PPTO. 0.00%
06 FLETES
06.01 FLETE TRANSPORTE DE MATERIALES (PIURA - HUANCABAMBA - RESERVORIOS SONDOR GLB 1.00 17,000.77 17,000.77 0.00 0.10 1,700.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.8412 14,300.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.94 16,000.77 0.06 Metrado PPTO.
94.12%
COSTO DIRECTO 161,697.13 0.00 6,751.04 0.00 2,977.81 0.00 36,398.65 23,200.06 8,982.13 12,942.00 780.47 10,899.54 4,491.08 27,229.86 4,379.51 0.00 0.00 0.00 0.00 0.00 0.00 139,032.15
GASTOS GENERALES NO RELACIONADOS CON EL TIEMPO DE EJECUCION DE LA OBRA 1.1469736% 1,854.62 0.00 77.43 0.00 34.15 0.00 417.48 266.10 103.02 148.44 8.95 125.01 51.51 312.32 50.23 0.00 0.00 0.00 0.00 0.00 0.00 1,594.66
(GASTOS FIJOS)
GASTOS GENERALES RELACIONADOS CON EL TIEMPO DE EJECUCION DE LA OBRA 5.1765349% 8,370.31 0.00 349.47 0.00 154.15 0.00 1,884.19 1,200.96 464.96 669.95 40.40 564.22 232.48 1,409.56 226.71 0.00 0.00 0.00 0.00 0.00 0.00 7,197.05
(GASTOS VARIABLES)
UTILIDAD 7.00% 11,318.80 0.00 472.57 0.00 208.45 0.00 2,547.91 1,624.00 628.75 905.94 54.63 762.97 314.38 1,906.09 306.57 0.00 0.00 0.00 0.00 0.00 0.00 9,732.25
SUB TOTAL 183,240.86 0.00 7,650.51 0.00 3,374.56 0.00 41,248.23 26,291.12 10,178.86 14,666.33 884.45 12,351.74 5,089.45 30,857.83 4,963.02 0.00 0.00 0.00 0.00 0.00 0.00 157,556.11
IGV (18%) 32,983.35 0.00 1,377.09 0.00 607.42 0.00 7,424.68 4,732.40 1,832.19 2,639.94 159.20 2,223.31 916.10 5,554.41 893.34 0.00 0.00 0.00 0.00 0.00 0.00 28,360.10
PRESUPUESTO TOTAL 216,224.21 0.00 9,027.60 0.00 3,981.98 0.00 48,672.91 31,023.52 12,011.05 17,306.27 1,043.65 14,575.05 6,005.55 36,412.24 5,856.36 0.00 0.00 0.00 0.00 0.00 0.00 185,916.21
“INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PIURA
OBRA
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88 F.R. =
CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S.
CONTRATISTA CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL
MORROPON HUANCABAMBA (GR)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
RESUMEN DE METRADOS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 TOTAL METRADO SALDO DE Porcentaje de
TOTAL METRADO Control de Metrados
VALORIZADO Avance
VALORIZACIÓN N° 01 VALORIZACIÓN N° 02 VALORIZACIÓN N° 03 VALORIZACIÓN N° 04 VALORIZACIÓN N° 05 VALORIZACIÓN N° 06 VALORIZACIÓN N° 07 VALORIZACIÓN N° 08 VALORIZACIÓN N° 09 VALORIZACIÓN N° 10 VALORIZACIÓN N° 11 VALORIZACIÓN N° 12 VALORIZACIÓN N° 13 VALORIZACIÓN N° 14 VALORIZACIÓN N° 15 VALORIZACIÓN N° 16 VALORIZACIÓN N° 17 VALORIZACIÓN N° 18 VALORIZACIÓN N° 19 VALORIZACIÓN N° 20 PRESUPUESTO
Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/.
01201209201.03 CONCRETO F'C 210 KG/CM2 PARA ANCLAJES Y/O DADOS m3 1.60 449.15 718.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.60 718.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.60 718.64 0.00 Metrado PPTO. 100.00%
01201209201.03 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA ANCLAJES Y/O DADOS m2 8.00 36.20 289.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 289.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 289.60 0.00 Metrado PPTO. 100.00%
01201209201.03 ACERO ESTRUCTURAL TRABAJADO PARA DADO DE ANCLAJEDESPERDICIOS) kg 33.34 4.18 139.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.34 139.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.34 139.36 0.00 Metrado PPTO. 100.00%
01201209201.03 CONCRETO F'C= 210 KG/CM2 PARA COLUMNAS m3 0.54 488.75 263.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.54 263.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.54 263.93 0.00 Metrado PPTO. 100.00%
01201209201.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 7.20 44.94 323.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.20 323.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.20 323.57 0.00 Metrado PPTO. 100.00%
01201209201.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 61.97 4.29 265.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 61.97 265.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 61.97 265.85 0.00 Metrado PPTO. 100.00%
01201209201.04 CARPINTERIA METALICA
01201209201.04 SOPORTE Y ANCLAJE DE CABLE PRINCIPAL und 2.00 229.87 459.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 459.74 0.00 0.00 0.00 0.00 0.00 0.00 2.00 459.74 0.00 Metrado PPTO. 100.00%
01201209201.04 SOPORTE DE TUBERIA DN 100mm CON CABLE DE ACERO und 5.00 248.74 1,243.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 1,243.70 0.00 0.00 0.00 0.00 0.00 0.00 5.00 1,243.70 0.00 Metrado PPTO. 100.00%
01201209201.04 CABLE DE ACERO GALV. Ø1/2" 6X19 TIPO BOA (ALMA DE ACERO) m 25.00 29.05 726.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 726.25 0.00 0.00 0.00 0.00 0.00 0.00 25.00 726.25 0.00 Metrado PPTO. 100.00%
01201209201.04 TUBERIA FIE.GALVANIZADO PESADO C-40 1" I/ELEM.UNION+ 2%DESP. m 18.00 100.14 1,802.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.00 1,802.52 0.00 0.00 0.00 0.00 0.00 0.00 18.00 1,802.52 0.00 Metrado PPTO. 100.00%
01201209202 CRUCE-AEREO-02, L=9.00m
01201209202.01 OBRAS PRELIMINARES
01201209202.01 TRAZO, NIVELACION Y REPLANTEO DE CRUCE DE TUBERIA KM 0.01 886.68 8.87 0.00 0.01 8.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 8.87 0.00 Metrado PPTO. 100.00%
01201209202.02 MOVIMIENTO DE TIERRAS
01201209202.02 EXCAVACIONES EN TERRENO SEMIROCOSO A PULSO HASTA 1.50 M DE PROF m3 24.00 55.27 1,326.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.00 1,326.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.00 1,326.48 0.00 Metrado PPTO. 100.00%
01201209202.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO SEMIROCOSO A PULSO m2 5.00 2.63 13.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 13.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 13.15 0.00 Metrado PPTO. 100.00%
01201209202.02 RELLENO COMPACTADO EN TERRENO SEMIRROCOSO A PULSO m3 1.50 25.95 38.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.50 38.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.50 38.93 0.00 Metrado PPTO. 100.00%
01201209202.02 ELIMINACION DE MATERIAL EXCEDENTE A 30 M DE DIST. INCL. ESPONJAMIENT m3 30.00 24.16 724.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00 724.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00 724.80 0.00 Metrado PPTO. 100.00%
01201209202.03 OBRAS DE CONCRETO
01201209202.03 CONCRETO F'C=100 KG/CM2. PARA SOLADOS Y/O SUB BASES m3 0.50 332.75 166.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 166.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 166.38 0.00 Metrado PPTO. 100.00%
01201209202.03 CONCRETO F'C= 210 KG/CM2 EN ZAPATAS m3 1.50 425.70 638.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.50 638.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.50 638.55 0.00 Metrado PPTO. 100.00%
01201209202.03 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATA kg 37.90 4.18 158.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 37.90 158.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 37.90 158.42 0.00 Metrado PPTO. 100.00%
01201209202.03 CONCRETO F'C 210 KG/CM2 PARA ANCLAJES Y/O DADOS m3 1.60 449.15 718.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.60 718.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.60 718.64 0.00 Metrado PPTO. 100.00%
01201209202.03 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA ANCLAJES Y/O DADOS m2 8.00 36.20 289.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 289.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 289.60 0.00 Metrado PPTO. 100.00%
01201209202.03 ACERO ESTRUCTURAL TRABAJADO PARA DADO DE ANCLAJEDESPERDICIOS) kg 33.34 4.18 139.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.34 139.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.34 139.36 0.00 Metrado PPTO. 100.00%
01201209202.03 CONCRETO F'C= 210 KG/CM2 PARA COLUMNAS m3 0.54 488.75 263.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.54 263.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.54 263.93 0.00 Metrado PPTO. 100.00%
01201209202.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 7.20 44.94 323.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.20 323.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.20 323.57 0.00 Metrado PPTO. 100.00%
01201209202.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 61.97 4.29 265.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 61.97 265.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 61.97 265.85 0.00 Metrado PPTO. 100.00%
01201209202.04 CARPINTERIA METALICA
01201209202.04 SOPORTE Y ANCLAJE DE CABLE PRINCIPAL und 2.00 229.87 459.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 459.74 0.00 0.00 0.00 0.00 0.00 0.00 2.00 459.74 0.00 Metrado PPTO. 100.00%
01201209202.04 SOPORTE DE TUBERIA DN 100mm CON CABLE DE ACERO und 5.00 248.74 1,243.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 1,243.70 0.00 0.00 0.00 0.00 0.00 0.00 5.00 1,243.70 0.00 Metrado PPTO. 100.00%
01201209202.04 CABLE DE ACERO GALV. Ø1/2" 6X19 TIPO BOA (ALMA DE ACERO) m 23.00 29.05 668.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.00 668.15 0.00 0.00 0.00 0.00 0.00 0.00 23.00 668.15 0.00 Metrado PPTO. 100.00%
01201209202.04 TUBERIA FIE.GALVANIZADO PESADO C-40 1" I/ELEM.UNION+ 2%DESP. m 15.00 100.14 1,502.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 1,502.10 0.00 0.00 0.00 0.00 0.00 0.00 15.00 1,502.10 0.00 Metrado PPTO. 100.00%
01201210 ROTURA DE PAVIMENTOS
01201210201 ROTURA Y REPOSICION DE PAVIMENTOS
01201210201.01 LINEA TRANSVERSAL
01201210201.01 LEVANTAMIENTO Y REPOSICION DE PAVIMENTO ASFALTO, E=1", INC. ELIMIN m 60.00 161.93 9,715.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 9,715.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 9,715.80 0.00 Metrado PPTO. 100.00%
01201210201.01 EXCAV. ZANJA (PULSO) P/TUB. TERRENO SEMIRROCOSO DN 26.5MM A 88.5MM m 60.00 29.84 1,790.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 1,790.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 1,790.40 0.00 Metrado PPTO. 100.00%
01201210201.01 ELIMINACION Y ACOMODO DE MATERIAL EXCEDENTE A ZONA ALEDAÑA P/ m 60.00 14.50 870.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 870.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 870.00 0.00 Metrado PPTO. 100.00%
01201210201.02 LINEA LONGITUDINAL
01201210201.02 REPOSICION DE PAVIMENTO FLEXIBLE, ESPESOR 1 PULGADA m2 1,500.95 28.78 43,197.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,500.95 Metrado PPTO. 0.00%
01202 CONEXIONES DOMICILIARIAS Y MICROMEDICION
01202201 CONEXIONES DOMICILIARIAS
01202201201 CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 26.5 MM T-NORMAL - SISTE und 53.00 181.78 9,634.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.00 4,726.28 0.00 0.00 0.00 0.00 0.00 26.00 4,726.28 27.00 Metrado PPTO. 49.06%
01202201202 CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 33 MM T-NORMAL - SISTEMA und 70.00 180.29 12,620.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.00 5,949.57 0.00 0.00 0.00 0.00 0.00 33.00 5,949.57 37.00 Metrado PPTO. 47.14%
01202201203 CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 48 MM T-NORMAL - SISTEMA und 46.00 193.52 8,901.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 3,096.32 0.00 0.00 0.00 0.00 0.00 16.00 3,096.32 30.00 Metrado PPTO. 34.78%
01202201204 CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 60 MM T-NORMAL - SISTEMA und 124.00 221.46 27,461.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 13,287.60 0.00 0.00 0.00 0.00 0.00 60.00 13,287.60 64.00 Metrado PPTO. 48.39%
01202201205 CONEXION DOMICILIARIA AGUA POTABLE TUBO DN 75 MM T-NORMAL - SISTEMA und 10.00 243.60 2,436.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 1,218.00 0.00 0.00 0.00 0.00 0.00 5.00 1,218.00 5.00 Metrado PPTO. 50.00%
01202202 MICROMEDICION
01202202201 MEDIDOR P/CONEXION DOMICILIARIA Ø1/2" TIPO CHORRO UNICO - VERIFICADO und 303.00 140.09 42,447.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.00 42,447.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.00 42,447.27 0.00 Metrado PPTO. 100.00%
01202202202 DISPOSITIVO METALICO DE SEGURIDAD TIPO ARGOLLA PARA MEDIDOR DE Ø1/2" und 303.00 9.38 2,842.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.00 2,842.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.00 2,842.14 0.00 Metrado PPTO. 100.00%
01202202203 INSTALACION DE MEDIDOR PARA CONEXION DOMICILIARIA DE AGUA DE 1/2" und 303.00 7.81 2,366.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 140.00 1,093.40 0.00 0.00 0.00 0.00 0.00 140.00 1,093.40 163.00 Metrado PPTO. 46.20%
01203 FLETE AGUA POTABLE
01203201 FLETE TRANSPORTE PIURA-HUANCABAMBA-SONDOR GLB 1.00 56,460.79 56,460.79 0.00 0.80 45,168.63 0.00 0.00 0.00 0.00 0.00 0.00 0.10 5,646.08 0.00 0.00 0.10 5,646.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 56,460.79 0.00 Metrado PPTO. 100.00%
COSTO DIRECTO 2,661,252.55 0.00 283,889.95 178,173.81 534,999.15 505,725.91 296,951.29 80,122.02 176,360.57 10,958.65 0.00 195,583.25 10,918.27 81,333.69 66,167.30 29,371.17 0.00 0.00 0.00 0.00 0.00 2,450,555.03
GASTOS GENERALES NO RELACIONADOS CON EL TIEMPO DE EJECUCION DE LA OBRA
(GASTOS FIJOS) 1.1469736% 30,523.86 0.00 3,256.14 2,043.61 6,136.30 5,800.54 3,405.95 918.98 2,022.81 125.69 0.00 2,243.29 125.23 932.88 758.92 336.88 0.00 0.00 0.00 0.00 0.00 28,107.22
GASTOS GENERALES RELACIONADOS CON EL TIEMPO DE EJECUCION DE LA OBRA 5.1765349% 137,760.67 0.00 14,695.66 9,223.23 27,694.42 26,179.08 15,371.79 4,147.54 9,129.37 567.28 0.00 10,124.44 565.19 4,210.27 3,425.17 1,520.41 0.00 0.00 0.00 0.00 0.00 126,853.84
(GASTOS VARIABLES)
UTILIDAD 7.00% 186,287.68 0.00 19,872.30 12,472.17 37,449.94 35,400.81 20,786.59 5,608.54 12,345.24 767.11 0.00 13,690.83 764.28 5,693.36 4,631.71 2,055.98 0.00 0.00 0.00 0.00 0.00 171,538.85
SUB TOTAL 3,015,824.76 0.00 321,714.05 201,912.82 606,279.81 573,106.34 336,515.62 90,797.08 199,857.99 12,418.73 0.00 221,641.81 12,372.97 92,170.20 74,983.10 33,284.44 0.00 0.00 0.00 0.00 0.00 2,777,054.94
IGV (18%) 542,848.46 0.00 57,908.53 36,344.31 109,130.37 103,159.14 60,572.81 16,343.47 35,974.44 2,235.37 0.00 39,895.53 2,227.13 16,590.64 13,496.96 5,991.20 0.00 0.00 0.00 0.00 0.00 499,869.89
PRESUPUESTO TOTAL 3,558,673.22 0.00 379,622.58 238,257.13 715,410.18 676,265.48 397,088.43 107,140.55 235,832.43 14,654.10 0.00 261,537.34 14,600.10 108,760.84 88,480.06 39,275.64 0.00 0.00 0.00 0.00 0.00 3,276,924.83
01 LETRINA - UBS
01.01 TRABAJO PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,527.12 2.52 3,848.34 0.00 763.56 1,924.17 0.00 0.00 478.8 1,206.58 0.00 0.00 0 0.00 120.96 304.82 0.00 0.00 148.70 374.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,512.02 3,810.29 15.10 Metrado PPTO. 99.01%
01.01.02 TRAZO, NIVELES Y REPLANTEO INICIAL DE EDIFICACIONES m2 1,527.12 1.98 3,023.70 0.00 763.56 1,511.85 0.00 0.00 478.8 948.02 0 0.00 0.00 0 0.00 120.96 239.50 0.00 0.00 148.70 294.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,512.02 2,993.80 15.10 Metrado PPTO. 99.01%
01.02 MOVIMIENTO DE TIERRAS
01.02.01 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS Y ZAPATAS m3 457.53 50.46 23,086.96 0.00 0 0.00 0.00 30.240 1,525.91 143.64 7,248.07 140.62 7,095.69 78.62 3,967.17 9.07 457.67 36.29 1,831.19 0.00 0.00 14.52 732.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 453.00 22,858.38 4.53 Metrado PPTO. 99.01%
01.02.02 RELLENO COMPACTADO CON AFIRMADO m3 457.53 103.26 47,244.55 0.00 0 0.00 0.00 30.240 3,122.58 143.64 14,832.27 140.62 14,520.42 78.62 8,118.30 9.07 936.57 36.29 3,747.31 0.00 0.00 14.52 1,499.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 453.00 46,776.79 4.53 Metrado PPTO. 99.01%
01.02.03 ELIMINACION DE MATERIAL EXCEDENTE A 200 M DE DIST. INCL. ESPONJAMIENTO m3 548.43 36.25 19,880.59 0.00 0 0.00 0.00 36.270 1,314.79 172.28 6,245.15 168.66 6,113.93 94.3 3,418.38 10.88 394.40 43.52 1,577.60 0.00 0.00 17.09 619.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 543.00 19,683.76 5.43 Metrado PPTO. 99.01%
01.03 OBRAS DE CONCRETO SIMPLE
01.03.01 SOLADOS DE CONCRETO F'C=100KG/CM² m2 1,527.12 30.75 46,958.94 0.00 0 0.00 0.00 100.800 3,099.60 478.8 14,723.10 468.72 14,413.14 262.08 8,058.96 30.24 929.88 120.96 3,719.52 0.00 0.00 50.40 1,549.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,512.00 46,494.00 15.12 Metrado PPTO. 99.01%
01.04 OBRAS DE CONCRETO ARMADO
01.04.01 CONCRETO F'C =175 KG/CM2 PARA BASE m3 151.50 360.56 54,624.84 0.00 0 0.00 0.00 10.080 3,634.44 47.88 17,263.61 46.87 16,899.45 26.21 9,450.28 3.02 1,088.89 12.1 4,362.78 0.00 0.00 3.84 1,384.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 150.00 54,084.00 1.50 Metrado PPTO. 99.01%
01.04.02 ACERO F'Y=4200 KG/CM2 kg 3,866.28 3.89 15,039.83 0.00 0 0.00 0.00 255.200 992.73 1212.2 4,715.46 1186.68 4,616.19 663.52 2,581.09 76.56 297.82 306.24 1,191.27 0.00 0.00 127.60 496.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,828.00 14,890.92 38.28 Metrado PPTO. 99.01%
01.04.03 CONCRETO F'C=175 KG/CM2 SOBRECIMIENTO m3 87.87 409.77 36,006.49 0.00 0 0.00 0.00 5.700 2,335.69 27.08 11,096.57 26.51 10,863.00 14.82 6,072.79 1.71 700.71 6.84 2,802.83 0.00 0.00 4.33 1,774.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 86.99 35,645.89 0.88 Metrado PPTO. 99.00%
01.04.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 1,181.70 38.5 45,495.45 0.00 0 0.00 0.00 78.000 3,003.00 78.00 3,003.00 78 3,003.00 78 3,003.00 23.4 900.90 93.6 3,603.60 0.00 0.00 741.00 28,528.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,170.00 45,045.00 11.70 Metrado PPTO. 99.01%
01.05 MUROS Y TABIQUES DE ALBAÑILERIA
01.05.01 MURO DE LADRILLO 9 x 13 x 24 cm. MAQUINADO DE SOGA m2 4,011.72 59.45 238,496.75 0.00 0 0.00 0.00 264.760 15,739.98 1257.61 74,764.91 1231.13 73,190.68 688.38 40,924.19 79.43 4,722.11 317.71 18,887.86 0.00 0.00 132.98 7,905.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,972.00 236,135.39 39.72 Metrado PPTO. 99.01%
01.05.02 MURO DE LADRILLO 9 x 13 x 24 cm. MAQUINADO DE CANTO m2 109.08 41.75 4,554.09 0.00 0 0.00 0.00 7.200 300.60 34.2 1,427.85 7.2 300.60 7.2 300.60 2.16 90.18 8.64 360.72 0.00 0.00 41.40 1,728.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 108.00 4,509.00 1.08 Metrado PPTO. 99.01%
01.06 PISOS
01.06.01 PISO CEMENTO PULIDO m2 1,199.88 27.65 33,176.68 0.00 0 0.00 0.00 79.200 2,189.88 376.2 10,401.93 368.28 10,182.94 205.2 5,673.78 23.76 656.96 95.04 2,627.86 0.00 0.00 40.32 1,114.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,188.00 32,848.20 11.88 Metrado PPTO. 99.01%
01.07 ZOCALOS Y CONTRAZOCALOS
01.07.01 CONTRAZOCALOS
01.07.01.01 CONTRAZÓCALO DE CEMENTO S/COLOREAR, H=25 cm. m2 1,308.96 12.51 16,375.09 0.00 0 0.00 0.00 86.400 1,080.86 410.4 5,134.10 401.76 5,026.02 224.64 2,810.25 25.92 324.26 103.68 1,297.04 0.00 0.00 43.20 540.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,296.00 16,212.96 12.96 Metrado PPTO. 99.01%
01.08 COBERTURA
01.08.01 SUMINISTRO Y COLOCACION DE TEJA ANDINA DE 1,14x0,72 m.x 2mm m2 1,527.12 59.68 91,138.52 0.00 0 0.00 1,206.42 71,999.43 100.800 6,015.74 0.00 0.00 0.00 0.00 0 0.00 120.96 7,218.89 0.00 0.00 83.81 5,001.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,511.99 90,235.84 15.125 Metrado PPTO. 99.01%
01.08.02 COLOCACIÓN DE CORREAS DE MADERA TORNILLO DE 2"x2". m 4,726.80 15.52 73,359.94 0.00 0 0.00 1,218.00 18,903.36 312.000 4,842.24 1014.00 15,737.28 1201.2 18,642.62 780 12,105.60 0 0.00 0 0.00 0.00 0.00 154.80 2,402.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,680.00 72,633.60 46.80 Metrado PPTO. 99.01%
01.09 CARPINTERIA METALICA
01.09.01 PUERTA DE CALAMINA F°G° E=0.27MM, MARCO DE MADERA m2 402.99 180.61 72,784.02 0.00 0 0.00 0.00 26.600 4,804.23 86.45 15,613.73 90.44 16,334.37 26.6 4,804.23 122.36 22,099.44 31.92 5,765.07 0.00 0.00 14.63 2,642.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 399.00 72,063.39 3.99 Metrado PPTO. 99.01%
01.09.02 VENTANA DE MALLA METALICA m2 121.20 174.98 21,207.58 0.00 0 0.00 0.00 7.900 1,382.34 25.68 4,493.49 26.86 4,699.96 7.9 1,382.34 36.34 6,358.77 9.48 1,658.81 0.00 0.00 5.84 1,021.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 120.00 20,997.59 1.20 Metrado PPTO. 99.01%
01.10 VARIOS
01.10.01 LIMPIEZA GENERAL DE OBRA m2 1,527.12 1.28 1,954.71 0.00 0 0.00 0.00 100.800 129.02 327.60 419.33 342.72 438.68 100.8 129.02 463.68 593.51 120.96 154.83 0.00 0.00 55.44 70.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,512.00 1,935.35 15.12 Metrado PPTO. 99.01%
01.11 INSTALACIONES SANITARIAS
01.11.01 SISTEMA DE AGUA FRIA
01.11.01.01 SALIDA DE AGUA FRIA CON TUBERIA PVC-SAP DE 1/2'' pto 1,212.00 58.58 70,998.96 0.00 0 0.00 0.00 80.000 4,686.40 380.00 22,260.40 372 21,791.76 208 12,184.64 24 1,405.92 96 5,623.68 0.00 0.00 40.00 2,343.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,200.00 70,296.00 12.00 Metrado PPTO. 99.01%
01.11.01.02 RED DE DISTRIBUCION TUBERIA DE PVC-SAP CLASE-10 Ø 1/2" m 3,336.03 21.9 73,059.06 0.00 1134.25 24,840.08 0.00 220.200 4,822.38 1045.95 22,906.31 803.73 17,601.69 0.00 66.06 1,446.71 0 0.00 0.00 0.00 32.81 718.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,303.00 72,335.71 33.03 Metrado PPTO. 99.01%
01.11.01.03 SUMINISTRO E INSTALACION TEE PVC 1/2" x 1/2" und 909.00 11.84 10,762.56 0.00 0 0.00 0.00 60.000 710.40 285.00 3,374.40 279 3,303.36 156 1,847.04 18 213.12 72 852.48 0.00 0.00 30.00 355.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 900.00 10,656.00 9.00 Metrado PPTO. 99.01%
01.11.01.04 SUMINISTRO E INSTALACIÓN DE CODO DE Ø 1/2" x 90°- PVC und 4,242.00 4.4 18,664.80 0.00 0 0.00 0.00 280.000 1,232.00 1330.00 5,852.00 1302 5,728.80 728 3,203.20 84 369.60 336 1,478.40 0.00 0.00 140.00 616.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,200.00 18,480.00 42.00 Metrado PPTO. 99.01%
01.11.01.05 SUMINISTRO E INSTALACIÓN DE VALVULA COMPUERTA DE Ø 1/2" und 606.00 46.85 28,391.10 0.00 0 0.00 0.00 40.000 1,874.00 190.00 8,901.50 186 8,714.10 104 4,872.40 12 562.20 48 2,248.80 0.00 0.00 20.00 937.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 600.00 28,110.00 6.00 Metrado PPTO. 99.01%
01.11.01.06 CAJA DE VALVULAS DE MADERA und 606.00 66.57 40,341.42 0.00 0 0.00 0.00 40.000 2,662.80 190.00 12,648.30 186 12,382.02 104 6,923.28 12 798.84 48 3,195.36 0.00 0.00 20.00 1,331.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 600.00 39,942.00 6.00 Metrado PPTO. 99.01%
01.11.02 SISTEMA DE DESAGUE Y VENTILACION
01.11.02.01 SUMINISTRO E INSTALACION DE TUBERIA PVC-SAL DE Ø 4'' PARA DESAGUE m 909.00 28.97 26,333.73 0.00 309.06 8,953.47 0.00 60.000 1,738.20 285.00 8,256.45 219 6,344.43 0.00 18 521.46 0 0.00 0.00 0.00 8.94 258.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 900.00 26,073.00 9.00 Metrado PPTO. 99%
01.11.02.02 SUMINISTRO E INSTALACION DE TUBERIA PVC-SAL DE Ø 2'' PARA DESAGUE m 4,393.50 19.33 84,926.36 0.00 1493.79 28,874.96 0.00 290.000 5,605.70 1377.50 26,627.08 1058.5 20,460.81 0.00 87 1,681.71 0 0.00 0.00 0.00 43.21 835.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,350.00 84,085.51 43.50 Metrado PPTO. 99.01%
01.11.02.03 SALIDA DE PVC-SAL DE 4'' PARA DESAGUE pto 606.00 71.77 43,492.62 0.00 0 0.00 0.00 40.000 2,870.80 190.00 13,636.30 186 13,349.22 104 7,464.08 12 861.24 48 3,444.96 0.00 0.00 20.00 1,435.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 600.00 43,062.00 6.00 Metrado PPTO. 99.01%
01.11.02.04 SALIDA DE PVC-SAL DE 2'' PARA DESAGUE pto 1,212.00 43.99 53,315.88 0.00 0 0.00 0.00 80.000 3,519.20 380.00 16,716.20 372 16,364.28 208 9,149.92 24 1,055.76 96 4,223.04 0.00 0.00 40.00 1,759.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,200.00 52,788.00 12.00 Metrado PPTO. 99.01%
01.11.02.05 SALIDA DE PVC-SAL DE 2'' PARA VENTILACION pto 303.00 37.5 11,362.50 0.00 0 0.00 0.00 20.000 750.00 95.00 3,562.50 93 3,487.50 52 1,950.00 6 225.00 24 900.00 0.00 0.00 10.00 375.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 11,250.00 3.00 Metrado PPTO. 99.01%
01.11.02.06 SUMIDERO DE BRONCE 2", PROVISION Y COLOCACION und 606.00 59.53 36,075.18 0.00 0 0.00 0.00 40.000 2,381.20 190.00 11,310.70 186 11,072.58 104 6,191.12 12 714.36 48 2,857.44 0.00 0.00 20.00 1,190.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 600.00 35,718.00 6.00 Metrado PPTO. 99.01%
01.11.02.07 YEE PVC - SAL CON REDUCCION DE 4'' A 2'' und 606.00 15.83 9,592.98 0.00 0 0.00 0.00 40.000 633.20 190.00 3,007.70 186 2,944.38 104 1,646.32 12 189.96 48 759.84 0.00 0.00 20.00 316.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 600.00 9,498.00 6.00 Metrado PPTO. 99.01%
01.11.02.08 CODO PVC SAL 2"X45° und 1,212.00 9.87 11,962.44 0.00 0 0.00 0.00 80.000 789.60 380.00 3,750.60 372 3,671.64 208 2,052.96 24 236.88 96 947.52 0.00 0.00 40.00 394.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,200.00 11,844.00 12.00 Metrado PPTO. 99.01%
01.11.02.09 CODO PVC SAL 4"X90° pza 303.00 13.76 4,169.28 0.00 0 0.00 0.00 20.000 275.20 95.00 1,307.20 93 1,279.68 52 715.52 6 82.56 24 330.24 0.00 0.00 10.00 137.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 4,128.00 3.00 Metrado PPTO. 99.01%
01.11.02.10 TEE PVC-SAL 4" X 4" SANITARIA und 303.00 24.13 7,311.39 0.00 0 0.00 0.00 20.000 482.60 95.00 2,292.35 93 2,244.09 52 1,254.76 6 144.78 24 579.12 0.00 0.00 10.00 241.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 7,239.00 3.00 Metrado PPTO. 99.01%
01.11.02.11 REGISTRO ROSCADO DE BRONCE 4", PROVISION Y COLOCACION und 303.00 46.11 13,971.33 0.00 0 0.00 0.00 20.000 922.20 95.00 4,380.45 93 4,288.23 52 2,397.72 6 276.66 24 1,106.64 0.00 0.00 10.00 461.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 13,833.00 3.00 Metrado PPTO. 99.01%
01.11.03 APARATOS Y ACCESORIOS SANITARIOS
01.11.03.01 SUMINISTRO E INSTALACION DE INODORO BLANCO INC. ACCESORIOS und 303.00 234.68 71,108.04 0.00 0 0.00 0.00 20.000 4,693.60 65.00 15,254.20 68 15,958.24 20 4,693.60 90 21,121.20 24 5,632.32 0.00 0.00 13.00 3,050.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 70,404.00 3.00 Metrado PPTO. 99.01%
01.11.03.02 SUMINISTRO E INSTALACIÓN DE DUCHA CROMADA INC. ACCESORIOS und 303.00 89.81 27,212.43 0.00 0 0.00 0.00 20.000 1,796.20 65.00 5,837.65 68 6,107.08 20 1,796.20 90 8,082.90 24 2,155.44 0.00 0.00 13.00 1,167.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 26,943.00 3.00 Metrado PPTO. 99.01%
01.11.03.03 LAVATORIO DE PARED BLANCO 1 LLAVE und 303.00 116.67 35,351.01 0.00 0 0.00 0.00 20.000 2,333.40 65.00 7,583.55 68 7,933.56 20 2,333.40 90 10,500.30 24 2,800.08 0.00 0.00 13.00 1,516.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 35,001.00 3.00 Metrado PPTO. 99.01%
01.11.03.04 LAVADERO DE GRANITO und 303.00 80.52 24,397.56 0.00 0 0.00 0.00 20.000 1,610.40 53.00 4,267.56 69 5,555.88 24 1,932.48 92 7,407.84 24 1,932.48 0.00 0.00 18.00 1,449.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 24,156.00 3.00 Metrado PPTO. 99.01%
01.11.03.05 CAJA DE REGISTRO PARA DESAGUE DE 30x60 cm und 303.00 92.2 27,936.60 0.00 0 0.00 0.00 20.000 1,844.00 66.00 6,085.20 73 6,730.60 22 2,028.40 84 7,744.80 24 2,212.80 0.00 0.00 11.00 1,014.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 27,660.00 3.00 Metrado PPTO. 99.01%
01.11.04 BIODIGESTOR
01.11.04.01 TRAZO, NIVELES Y REPLANTEO INICIAL DE EDIFICACIONES m2 618.12 1.98 1,223.88 0.00 309.06 611.94 0.00 40.800 80.78 106.08 210.04 142.8 282.74 0.00 0 0.00 0 0.00 0.00 0.00 13.26 26.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 612.00 1,211.75 6.12 Metrado PPTO. 99.01%
01.11.04.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS Y ZAPATAS m3 1,302.90 50.46 65,744.33 0.00 0 0.00 0.00 86.090 4,344.10 223.83 11,294.46 387.4 19,548.20 301.31 15,204.10 73.17 3,692.16 103.31 5,213.02 0.00 0.00 114.89 5,797.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,290.00 65,093.39 12.90 Metrado PPTO. 99.01%
01.11.04.03 RELLENO CON MATERIAL PROPIO ZARANDEADO m3 778.71 27.22 21,196.49 0.00 0 0.00 0.00 51.410 1,399.38 48.84 1,329.42 128.52 3,498.31 233.91 6,367.03 92.53 2,518.67 56.55 1,539.29 0.00 0.00 159.24 4,334.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 771.00 20,986.61 7.71 Metrado PPTO. 99.01%
01.11.04.04 RELLENO CON MORTERO 1:8 m3 751.44 21.45 16,118.39 0.00 0 0.00 0.00 49.570 1,063.28 47.09 1,010.08 0 0.00 225.55 4,838.05 89.23 1,913.98 54.53 1,169.67 0.00 0.00 278.03 5,963.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 744.00 15,958.80 7.44 Metrado PPTO. 99.01%
01.11.04.05 RELLENO CON MATERIAL DE PRESTAMO HORMIGON m3 6.06 41.06 248.82 0.00 0 0.00 0.00 0.410 16.83 0.39 16.01 0 0.00 1.86 76.37 0.73 29.97 0.45 18.48 0.00 0.00 2.16 88.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 246.35 0.06 Metrado PPTO. 99.01%
01.11.04.06 ACERO F'Y=4200 KG/CM2 kg 469.65 3.89 1,826.94 0.00 0 0.00 0.00 30.910 120.24 29.37 114.25 0 0.00 140.65 547.13 55.64 216.44 34 132.26 0.00 0.00 174.43 678.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 465.00 1,808.85 4.65 Metrado PPTO. 99.01%
01.11.04.07 CONCRETO F'C=175 KG/CM2 LOSA FONDO m3 6.06 343.48 2,081.49 0.00 0 0.00 0.00 0.410 140.83 0.39 133.96 0 0.00 1.86 638.87 0.73 250.74 0.45 154.57 0.00 0.00 2.16 741.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 2,060.89 0.06 Metrado PPTO. 99.01%
01.11.04.08 ENCOFRADO Y DESENCOFRADO DE LOSA FONDO m2 42.42 32.23 1,367.20 0.00 0 0.00 0.00 2.800 90.24 2.66 85.73 0 0.00 12.74 410.61 5.04 162.44 3.08 99.27 0.00 0.00 15.68 505.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.00 1,353.66 0.42 Metrado PPTO. 99.01%
01.11.04.09 ELIMINACION DE MATERIAL EXCEDENTE A 100 M DE DIST. INCL. ESPONJAMIENT m3 630.24 36.25 22,846.20 0.00 0 0.00 0.00 41.680 1,510.90 39.59 1,435.14 104.19 3,776.89 189.63 6,874.09 75.02 2,719.48 45.84 1,661.70 0.00 0.00 128.05 4,641.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 624.00 22,620.01 6.24 Metrado PPTO. 99.01%
01.11.04.10 TANQUE BIODIGESTOR DE POLIETILENO DE 1600 LT, INC. ACCESORIOS und 303.00 1578.61 478,318.83 0.00 0 0.00 77 121,552.97 20.000 31,572.20 43.00 67,880.23 89 140,496.29 70 110,502.70 0 0.00 0.00 0.00 0.00 1.00 1,578.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 473,583.00 3.00 Metrado PPTO. 99.01%
01.11.05 POZO PERCOLADOR
01.11.05.01 TRAZO, NIVELES Y REPLANTEO INICIAL DE EDIFICACIONES m2 842.34 1.98 1,667.83 0.00 421.17 833.92 0.00 55.600 110.09 139.00 275.22 216.84 429.34 0.00 0 0.00 0.00 0.00 0.00 1.39 2.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 834.00 1,651.32 8.34 Metrado PPTO. 99.01%
01.11.05.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS Y ZAPATAS m3 2,102.75 50.46 106,104.77 0.00 0 0.00 0.00 138.720 6,999.81 346.81 17,500.03 679.74 34,299.68 450.85 22,749.89 208.08 10,499.72 166.47 8,400.08 0.00 0.00 91.28 4,605.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,081.95 105,055.20 20.80 Metrado PPTO. 99.01%
RESUMEN DE METRADOS
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
“INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE
PIURA
OBRA
PROCESO 001-2018/GOB.REG.PIURA-GSRMH-G PRESUPUESTO BASE : 13,977,395.88 F.R. =
CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S.
CONTRATISTA CAROLINA E.I.R.L.) MONTO DEL CONTRATO : 13,977,395.88
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL
MORROPON HUANCABAMBA (GR)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
RESUMEN DE METRADOS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 SALDO DE
TOTAL METRADO TOTAL METRADO Control de Metrados Porcentaje de
VALORIZADO PRESUPUESTO Avance
VALORIZACIÓN N° 01 VALORIZACIÓN N° 02 VALORIZACIÓN N° 03 VALORIZACIÓN N° 04 VALORIZACIÓN N° 05 VALORIZACIÓN N° 06 VALORIZACIÓN N° 07 VALORIZACIÓN N° 08 VALORIZACIÓN N° 09 VALORIZACIÓN N° 10 VALORIZACIÓN N° 11 VALORIZACIÓN N° 12 VALORIZACIÓN N° 13 VALORIZACIÓN N° 14 VALORIZACIÓN N° 15 VALORIZACIÓN N° 16 VALORIZACIÓN N° 17 VALORIZACIÓN N° 18 VALORIZACIÓN N° 19 VALORIZACIÓN N° 20
PARTIDA DESCRIPCION UND METRADO PRECIO UNIT. COSTO TOTAL
Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/. Metrado S/.
01.11.05.03 NIVELACION Y COMPACTADO DE TERRENO NATURAL m2 842.34 2.6 2,190.08 0.00 0 0.00 0.00 55.600 144.56 139.00 361.40 272.44 708.34 180.7 469.82 83.4 216.84 66.72 173.47 0.00 0.00 36.14 93.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 834.00 2,168.39 8.34 Metrado PPTO. 99.01%
01.11.05.04 RELLENO CON MATERIAL GRAVA DE 2" - 3" m3 93.93 97.52 9,160.05 0.00 0 0.00 0.00 6.170 601.70 5.55 541.24 12.96 1,263.86 15.12 1,474.50 23.45 2,286.84 8.64 842.57 0.00 0.00 21.11 2,058.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 93.00 9,069.36 0.93 Metrado PPTO. 99.01%
01.11.05.05 RELLENO LATERAL CON MATERIAL GRAVA DE 3/4" - 1" m3 93.93 115.96 10,892.12 0.00 0 0.00 0.00 6.170 715.47 5.55 643.58 12.96 1,502.84 15.12 1,753.32 23.45 2,719.26 8.64 1,001.89 0.00 0.00 21.11 2,447.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 93.00 10,784.28 0.93 Metrado PPTO. 99.01%
01.11.05.06 ELIMINACION DE MATERIAL EXCEDENTE A 100 M DE DIST. INCL. ESPONJAMIENT m3 1,893.75 36.25 68,648.44 0.00 0 0.00 0.00 124.950 4,529.44 312.39 11,324.14 612.27 22,194.79 406.1 14,721.13 187.43 6,794.34 149.94 5,435.33 0.00 0.00 81.92 2,969.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,875.00 67,968.77 18.75 Metrado PPTO. 99.01%
01.11.05.07 ACERO F'Y=4200 KG/CM2 kg 5,572.17 3.89 21,675.74 0.00 0 0.00 0.00 367.720 1,430.43 680.28 2,646.29 1158.31 4,505.83 1139.93 4,434.33 735.44 2,860.86 514.81 2,002.61 0.00 0.00 920.51 3,580.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,517.00 21,461.13 55.17 Metrado PPTO. 99.01%
01.11.05.08 CONCRETO PARA SOLADOS,e=0.10cm C:H, 1:12 m2 712.05 42.65 30,368.93 0.00 0 0.00 0.00 47.040 2,006.26 117.59 5,015.21 230.48 9,829.97 152.87 6,519.91 70.56 3,009.38 56.45 2,407.59 0.00 0.00 30.01 1,279.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 705.00 30,068.25 7.05 Metrado PPTO. 99.01%
01.11.05.09 CONCRETO F'C =175 KG/CM2 m3 96.96 360.56 34,959.90 0.00 0 0.00 0.00 6.320 2,278.74 11.70 4,218.55 19.82 7,146.30 19.6 7,066.98 12.65 4,561.08 8.85 3,190.96 0.00 0.00 17.06 6,151.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 96.00 34,613.76 0.96 Metrado PPTO. 99.01%
01.11.05.10 ENCOFRADO Y DESENCOFRADO P/ LOSA Y TAPA m2 330.27 35.91 11,860.00 0.00 0 0.00 0.00 21.700 779.25 40.15 1,441.79 68.36 2,454.81 67.27 2,415.67 43.4 1,558.49 30.38 1,090.95 0.00 0.00 55.74 2,001.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 327.00 11,742.58 3.27 Metrado PPTO. 99.01%
01.11.05.11 MURO DE LADRILLO 9 x 12 x 22 cm. ARTESANAL DE CABEZA EN POZO PERCOLAC m2 3,066.36 90.1 276,279.04 0.00 0 0.00 0.00 202.400 18,236.24 465.52 41,943.35 870.32 78,415.83 617.32 55,620.53 354.2 31,913.42 242.88 21,883.49 0.00 0.00 283.36 25,530.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,036.00 273,543.60 30.36 Metrado PPTO. 99.01%
01.11.05.12 TUBERIA DE PVC-SAL DE 2'' m 909.00 17.98 16,343.82 0.00 0 0.00 0.00 60.000 1,078.80 138.00 2,481.24 258 4,638.84 183 3,290.34 105 1,887.90 72 1,294.56 0.00 0.00 84.00 1,510.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 900.00 16,182.00 9.00 Metrado PPTO. 99.01%
01.11.05.13 CODO PVC SAL 2"X90° pza 303.00 13.76 4,169.28 0.00 0 0.00 0.00 20.000 275.20 46.00 632.96 86 1,183.36 61 839.36 35 481.60 24 330.24 0.00 0.00 28.00 385.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 4,128.00 3.00 Metrado PPTO. 99.01%
01.11.06 CAJA DE LODOS
01.11.06.01 TRAZO, NIVELES Y REPLANTEO INICIAL DE EDIFICACIONES m2 193.92 1.98 383.96 0.00 96.96 191.98 0.00 12.800 25.34 16.00 31.68 62.72 124.19 0.00 0 0.00 0.00 0.00 0.00 3.52 6.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 192.00 380.16 1.92 Metrado PPTO. 99.01%
01.11.06.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS Y ZAPATAS m3 233.31 50.46 11,772.82 0.00 0 0.00 0.00 15.360 775.07 19.20 968.83 93.7 4,728.10 47.62 2,402.91 16.9 852.77 18.43 929.98 0.00 0.00 19.79 998.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 231.00 11,656.26 2.31 Metrado PPTO. 99.01%
01.11.06.03 NIVELACION Y COMPACTADO DE TERRENO NATURAL m2 193.92 2.6 504.19 0.00 0 0.00 0.00 12.800 33.28 16.00 41.60 78.08 203.01 39.68 103.17 14.08 36.61 15.36 39.94 0.00 0.00 16.00 41.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 192.00 499.21 1.92 Metrado PPTO. 99.01%
01.11.06.04 BUZONETA DE CONCRETO, D=0.60M, H=1.2M und 303.00 1418.13 429,693.39 0.00 0 0.00 0.00 20.000 28,362.60 25.00 35,453.25 122 173,011.86 62 87,924.06 22 31,198.86 24 34,035.12 0.00 0.00 25.00 35,453.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 425,439.00 3.00 Metrado PPTO. 99.01%
01.11.06.05 TUBERIA DE PVC-SAL DE 2'' m 318.15 17.98 5,720.34 0.00 0 0.00 0.00 21.000 377.58 26.25 471.98 128.1 2,303.24 65.1 1,170.50 23.1 415.34 25.2 453.10 0.00 0.00 26.25 471.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 315.00 5,663.72 3.15 Metrado PPTO. 99.01%
01.11.06.06 VALVULA ESFERICA DE 2" und 303.00 118.41 35,878.23 0.00 0 0.00 0.00 20.000 2,368.20 25.00 2,960.25 122 14,446.02 62 7,341.42 22 2,605.02 24 2,841.84 0.00 0.00 25.00 2,960.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 35,523.00 3.00 Metrado PPTO. 99.01%
01.12 FLETE UBS
01.12.01 FLETE TRANSPORTE DE MATERIALES (PIURA-UBS-SONDOR) GLB 303.00 451.54 136,816.62 0.00 60.6 27,363.32 92 41,541.68 150.400 67,911.62 0 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.00 136,816.62 0.00
COSTO DIRECTO 3,405,056.42 0.00 95,105.69 253,997.44 283,125.57 631,554.96 934,647.26 553,193.81 221,598.08 200,974.12 0.00 198,497.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,372,694.29
GASTOS GENERALES NO RELACIONADOS CON EL TIEMPO DE EJECUCION DE LA OBRA 1.1469736% 39,055.10 0.00 1,090.84 2,913.28 3,247.38 7,243.77 10,720.16 6,344.99 2,541.67 2,305.12 0.00 2,276.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38,683.91
(GASTOS FIJOS)
GASTOS GENERALES RELACIONADOS CON EL TIEMPO DE EJECUCION DE LA OBRA 5.1765349% 176,263.93 0.00 4,923.18 13,148.27 14,656.09 32,692.66 48,382.34 28,636.27 11,471.10 10,403.50 0.00 10,275.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 174,588.70
(GASTOS VARIABLES)
UTILIDAD 7.00% 238,353.95 0.00 6,657.40 17,779.82 19,818.79 44,208.85 65,425.31 38,723.57 15,511.87 14,068.19 0.00 13,894.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 236,088.60
SUB TOTAL 3,858,729.40 0.00 107,777.11 287,838.81 320,847.83 715,700.24 1,059,175.07 626,898.64 251,122.72 227,750.93 0.00 224,944.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,822,055.50
IGV (18%) 694,571.29 0.00 19,399.88 51,810.99 57,752.61 128,826.04 190,651.51 112,841.76 45,202.09 40,995.17 0.00 40,489.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 687,969.99
PRESUPUESTO TOTAL 4,553,300.69 0.00 127,176.99 339,649.80 378,600.44 844,526.28 1,249,826.58 739,740.40 296,324.81 268,746.10 0.00 265,434.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,510,025.49
EQUIPAMIENTO DE JASS
1.00 Oficina Administrativa
1.10 Computadora Und. 2.00 2,160.00 4,320.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 4,320.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 4,320.00 0.00 Metrado PPTO. 100.00%
1.20 Impresora Und. 2.00 500.00 1,000.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,000.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,000.00 0.00 Metrado PPTO. 100.00%
1.30 Escritorio (1.8 x 0.85) Und. 4.00 405.00 1,620.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 1,620.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 1,620.00 0.00 Metrado PPTO. 100.00%
1.40 Estante de Metal de 2 x 0.8 x 0.3 Und. 3.00 300.00 900.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 900.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 900.00 0.00 Metrado PPTO. 100.00%
1.50 Sillas Und. 8.00 115.00 920.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 920.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 920.00 0.00 Metrado PPTO. 100.00%
1.60 Utiles de escritorio glb 1.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 Metrado PPTO.
2.00 Operación y Mantenimiento del Sistema
2.1 Herramientas
2.1.1 Anteojos de seguridad Und. 2.00 15.50 31.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 31.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 31.00 0.00 Metrado PPTO. 100.00%
2.1.2 Llaves fijas Juego 2.00 307.20 614.40 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 614.40 0.00 0.00 0.00 0.00 0.00 0.00 2.00 614.40 0.00 Metrado PPTO. 100.00%
2.1.3 Llave p/grifo Und. 2.00 18.00 36.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 36.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 36.00 0.00 Metrado PPTO. 100.00%
2.1.4 Llave estilson juego 10" a 18" Juego 2.00 479.23 958.46 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 958.46 0.00 0.00 0.00 0.00 0.00 0.00 2.00 958.46 0.00 Metrado PPTO. 100.00%
2.1.5 Llave francesa juego (8" - 18") Juego 2.00 731.16 1,462.33 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,462.33 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,462.33 0.00 Metrado PPTO. 100.00%
2.1.6 Arco de sierra tubular Und. 2.00 12.65 25.30 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 25.30 0.00 0.00 0.00 0.00 0.00 0.00 2.00 25.30 0.00 Metrado PPTO. 100.00%
2.1.7 Desarmadores juego de 10 piezas Juego 1.00 67.09 67.09 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 67.09 0.00 0.00 0.00 0.00 0.00 0.00 1.00 67.09 0.00 Metrado PPTO. 100.00%
2.1.8 Alicate mecánico Und. 2.00 14.28 28.56 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 28.56 0.00 0.00 0.00 0.00 0.00 0.00 2.00 28.56 0.00 Metrado PPTO. 100.00%
2.1.9 Espátula de 6" x 15 Und. 2.00 28.56 57.12 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 57.12 0.00 0.00 0.00 0.00 0.00 0.00 2.00 57.12 0.00 Metrado PPTO. 100.00%
2.1.10 Pala c/cuchara Und. 2.00 44.23 88.45 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 88.45 0.00 0.00 0.00 0.00 0.00 0.00 2.00 88.45 0.00 Metrado PPTO. 100.00%
2.1.11 Comba de acero forjado 4 libras Und. 2.00 126.69 253.38 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 253.38 0.00 0.00 0.00 0.00 0.00 0.00 2.00 253.38 0.00 Metrado PPTO. 100.00%
2.2 Materiales
2.2.01 Tubería de 2 1/2" Ml 600.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 600.00 0.00 0.00 600.00 0.00 0.00 Metrado PPTO.
2.2.02 Tubería de 2" Ml 598.00 7.20 4,303.88 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 598.00 4,303.88 0.00 0.00 0.00 0.00 0.00 0.00 598.00 4,303.88 0.00 Metrado PPTO. 100.00%
2.2.03 Tubería de 1 1/2" Ml 238.50 4.80 1,144.34 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 238.50 1,144.34 0.00 0.00 0.00 0.00 0.00 0.00 238.50 1,144.34 0.00 Metrado PPTO. 100.00%
2.2.04 Tubería de 1/2" Ml 500.00 2.14 1,071.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 500.00 1,071.00 0.00 0.00 0.00 0.00 0.00 0.00 500.00 1,071.00 0.00 Metrado PPTO. 100.00%
2.2.05 "T" 2 1/2" Und. 10.00 14.28 142.80 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 142.80 0.00 0.00 0.00 0.00 0.00 0.00 10.00 142.80 0.00 Metrado PPTO. 100.00%
2.2.06 "T" 2" Und. 50.00 10.20 509.80 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.00 509.80 0.00 0.00 0.00 0.00 0.00 0.00 50.00 509.80 0.00 Metrado PPTO. 100.00%
2.2.07 "T" 1 1/2" Und. 10.00 7.80 77.97 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 77.97 0.00 0.00 0.00 0.00 0.00 0.00 10.00 77.97 0.00 Metrado PPTO. 100.00%
2.2.08 Reducción 2 1/2" a 1/2" Und. 10.00 5.71 57.12 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 57.12 0.00 0.00 0.00 0.00 0.00 0.00 10.00 57.12 0.00 Metrado PPTO. 100.00%
2.2.09 Reducción 2" a 1/2" Und. 50.00 5.16 257.75 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.00 257.75 0.00 0.00 0.00 0.00 0.00 0.00 50.00 257.75 0.00 Metrado PPTO. 100.00%
2.2.10 Reducción 1 1/2" a 1/2" Und. 10.00 4.28 42.84 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 42.84 0.00 0.00 0.00 0.00 0.00 0.00 10.00 42.84 0.00 Metrado PPTO. 100.00%
2.2.11 Pegamento PVC Agua Gln 10.00 155.94 1,559.38 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 1,559.38 0.00 0.00 0.00 0.00 0.00 0.00 10.00 1,559.38 0.00 Metrado PPTO. 100.00%
2.2.12 Cinta Teflón Und. 54.00 1.80 97.16 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.00 97.16 0.00 0.00 0.00 0.00 0.00 0.00 54.00 97.16 0.00 Metrado PPTO. 100.00%
2.2.13 Llave Paso PVC 1/2" Und. 100.00 9.60 959.62 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 959.62 0.00 0.00 0.00 0.00 0.00 0.00 100.00 959.62 0.00 Metrado PPTO. 100.00%
2.2.14 Válvula esférica de bronce de 1 1/2" Und. 11.00 59.98 659.74 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.00 659.74 0.00 0.00 0.00 0.00 0.00 0.00 11.00 659.74 0.00 Metrado PPTO. 100.00%
2.2.15 Medidor de caudal chorro unico Ø 1/2" Und 20.00 75.00 1,500.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 1,500.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 1,500.00 0.00 Metrado PPTO. 100.00%
2.2.16 Válvula esférica de bronce de 2" Und. 10.00 239.90 2,399.04 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 2,399.04 0.00 0.00 0.00 0.00 0.00 0.00 10.00 2,399.04 0.00 Metrado PPTO. 100.00%
2.2.17 Arena especial para filtro lento m3 30.00 85.00 2,550.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00 2,550.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00 2,550.00 0.00 Metrado PPTO. 100.00%
COSTO DIRECTO 29,714.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29,714.53 0.00 0.00 0.00 0.00 0.00 0.00 29,714.53
GASTOS GENERALES (8%) 2,377.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,377.16 0.00 0.00 0.00 0.00 0.00 0.00 2,377.16
UTILIDAD (7%) 2,080.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,080.02 0.00 0.00 0.00 0.00 0.00 0.00 2,080.02
SUB TOTAL 34,171.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34,171.71 0.00 0.00 0.00 0.00 0.00 0.00 34,171.71
IMPUESTO GENERAL A LAS VENTAS (18%) 6,150.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,150.91 0.00 0.00 0.00 0.00 0.00 0.00 6,150.91
TOTAL 40,322.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40,322.62 0.00 0.00 0.00 0.00 0.00 0.00 40,322.62
Valorización Amortizacion
Actual Adelanto Acumulado de Saldo por
Monto Amortización Amortizar
No. Mes Directo
(S/)
V (S/) (S/) (S/)
Obra : “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO
PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE PIURA
Contratista : CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) ZONA 01
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
INSPECTOR DE OBRA ING°. FELIPE PURISACA SOSA
Material Valorización Real Bruta Adelanto Pagado Coef. Incid. del Mater. Adelanto Adelanto Reintegros Amortización Amortización
(a la fecha del ANTERIOR
Denominación Cód. No. Mes Monto S/. Monto Indice mes Io Ir Coef. % en Deflacio- Utilizado que NO corresp. Adelanto)
Valorizado del Pago Aug-17 Incid. Mon. Monom. nado D Amort. Amort.
V A Ima Imo Imr C % A*Imo / Ima U = V *C*% U*(Imr - Ima) / Imo AM=U*Ima/Imo
Obra : “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO
PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE PIURA
Contratista : CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) ZONA 01
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
INSPECTOR DE OBRA ING°. FELIPE PURISACA SOSA
Material Valorización Real Bruta Adelanto Pagado Coef. Incid. del Mater. Adelanto Adelanto Reintegros Amortización Amortización
(a la fecha del ANTERIOR
Denominación Cód. No. Mes Monto S/. Monto Indice mes Io Ir Coef. % en Deflacio- Utilizado que NO corresp. Adelanto)
Valorizado del Pago Aug-17 Incid. Mon. Monom. nado D Amort. Amort.
V A Ima Imo Imr C % A*Imo / Ima U = V *C*% U*(Imr - Ima) / Imo AM=U*Ima/Imo
06 Oct-18 3,373.01 363,331.44 1,067,685.73
07 Nov-18 2,157.83 186,833.24 1,254,518.97
08 Dec-18 1,908.38 117,400.99 1,371,919.96
09 Jan-19 833.47 159,523.48 1,531,443.44
10 Feb-19 1,531,443.44
11 Mar-19 1,531,443.44
REINTEGROS QUE NO CORRESPONDEN Y AMORTIZACION
POR LOS ADELANTOS PARA MATERIALES
(Con los Indices del mes siguiente de la valorización)
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
Obra : “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO
PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE PIURA
Contratista : CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) ZONA 01
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
INSPECTOR DE OBRA ING°. FELIPE PURISACA SOSA
Material Valorización Real Bruta Adelanto Pagado Coef. Incid. del Mater. Adelanto Adelanto Reintegros Amortización Amortización
(a la fecha del ANTERIOR
Denominación Cód. No. Mes Monto S/. Monto Indice mes Io Ir Coef. % en Deflacio- Utilizado que NO corresp. Adelanto)
Valorizado del Pago Aug-17 Incid. Mon. Monom. nado D Amort. Amort.
V A Ima Imo Imr C % A*Imo / Ima U = V *C*% U*(Imr - Ima) / Imo AM=U*Ima/Imo
Obra : “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO
PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE PIURA
Contratista : CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) ZONA 01
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
INSPECTOR DE OBRA ING°. FELIPE PURISACA SOSA
Material Valorización Real Bruta Adelanto Pagado Coef. Incid. del Mater. Adelanto Adelanto Reintegros Amortización Amortización
(a la fecha del ANTERIOR
Denominación Cód. No. Mes Monto S/. Monto Indice mes Io Ir Coef. % en Deflacio- Utilizado que NO corresp. Adelanto)
Valorizado del Pago Aug-17 Incid. Mon. Monom. nado D Amort. Amort.
V A Ima Imo Imr C % A*Imo / Ima U = V *C*% U*(Imr - Ima) / Imo AM=U*Ima/Imo
PLANTA DE TRATAMIENTO DE AGUA POTABLE (PTAP) 349,444.20 20-Jul-18
MADERA NACIONAL PARA ENCOF. Y CA 43 01 May-18 36,529.00 718.60 715.43 718.60 0.094 22.340% 36,367.86
p2 02 Jun-18 30,090.94 720.10 0.00 0.00 0.00
03 Jul-18 257,503.11 720.10 5,407.46 0.00 5,431.42
04 Aug-18 154,969.23 725.34 3,254.29 30.66 3,268.71
05 Sep-18 51,656.42 732.90 1,084.76 21.68 1,089.57
06 Oct-18 252,244.12 744.41 5,297.03 191.10 5,320.50
07 Nov-18 67,330.33 749.42 1,413.91 60.91 1,420.17
08 Dec-18 28,397.53 751.45 596.34 27.38 598.98
09 Jan-19 96,477.01 752.94 2,025.98 97.25 16,034.96
10 Feb-19
CEMENTO PORTLAND TIPO V 23 01 May-18 19,489.20 439.25 418.10 450.97 0.094 77.660% 18,550.79
Bls 02 Jun-18 30,090.94 453.10 0.00 0.00 0.00
03 Jul-18 257,503.11 453.10 18,797.83 622.70 19,748.74
04 Aug-18 154,969.23 453.63 11,312.82 389.09 11,885.09
05 Sep-18 51,656.42 453.45 3,770.94 128.07 3,961.70
06 Oct-18 252,244.12 447.09 18,413.92 345.29 19,345.41
07 Nov-18 67,330.33 444.38 4,915.14 60.31 5,163.78
08 Dec-18 28,397.53 446.63 2,073.03 36.59 2,177.90
09 Jan-19 96,477.01 448.95 7,042.86 163.40 0.00
10 Feb-19
AGREGADO GRUESO 05 01 May-18 149,330.00 450.97 448.18 450.97 0.205 41.951% 148,406.15
m3 02 Jun-18 30,090.94 453.10 0.00 0.00 0.00
03 Jul-18 257,503.11 453.10 22,145.15 0.00 22,283.01
04 Aug-18 154,969.23 453.63 13,327.28 79.10 13,410.24
05 Sep-18 51,656.42 453.45 4,442.43 24.58 4,470.08
06 Oct-18 252,244.12 447.09 21,692.88 0.00 21,827.92
07 Nov-18 67,330.33 444.38 5,790.38 0.00 5,826.43
08 Dec-18 28,397.53 446.63 2,442.17 0.00 2,457.37
09 Jan-19 96,477.01 448.95 8,296.98 0.00 28,348.63
10 Feb-19
ACERO DE CONSTRUCCION CORRUGA 03 01 May-18 144,096.00 513.58 460.39 513.58 0.092 100.000% 129,172.39
var 02 Jun-18 30,090.94 508.81 0.00 0.00 0.00
03 Jul-18 257,503.11 508.81 23,690.29 0.00 26,427.29
04 Aug-18 154,969.23 512.37 14,257.17 0.00 15,904.34
05 Sep-18 51,656.42 512.37 4,752.39 0.00 5,301.45
06 Oct-18 252,244.12 527.89 23,206.46 721.31 25,887.56
07 Nov-18 67,330.33 531.71 6,194.39 243.93 6,910.04
08 Dec-18 28,397.53 539.69 2,612.57 148.17 2,914.41
09 Jan-19 96,477.01 542.08 8,875.88 549.45 29,901.33
10 Feb-19
01 May-18 0.00 0.00
02 Jun-18 0.00 0.00 0.00
03 Jul-18 622.70 73,890.46 73,890.46
04 Aug-18 498.85 44,468.38 118,358.84
05 Sep-18 174.34 14,822.80 133,181.64
06 Oct-18 1,257.70 72,381.39 205,563.03
REINTEGROS QUE NO CORRESPONDEN Y AMORTIZACION
POR LOS ADELANTOS PARA MATERIALES
(Con los Indices del mes siguiente de la valorización)
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
Obra : “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO
PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE PIURA
Contratista : CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) ZONA 01
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
INSPECTOR DE OBRA ING°. FELIPE PURISACA SOSA
Material Valorización Real Bruta Adelanto Pagado Coef. Incid. del Mater. Adelanto Adelanto Reintegros Amortización Amortización
(a la fecha del ANTERIOR
Denominación Cód. No. Mes Monto S/. Monto Indice mes Io Ir Coef. % en Deflacio- Utilizado que NO corresp. Adelanto)
Valorizado del Pago Aug-17 Incid. Mon. Monom. nado D Amort. Amort.
V A Ima Imo Imr C % A*Imo / Ima U = V *C*% U*(Imr - Ima) / Imo AM=U*Ima/Imo
07 Nov-18 365.15 19,320.42 224,883.45
08 Dec-18 212.14 8,148.66 233,032.11
09 Jan-19 810.09 74,284.92 307,317.03
10 Feb-19 307,317.03
11 Mar-19 307,317.03
REINTEGROS QUE NO CORRESPONDEN Y AMORTIZACION
POR LOS ADELANTOS PARA MATERIALES
(Con los Indices del mes siguiente de la valorización)
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
Obra : “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO
PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE PIURA
Contratista : CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.) ZONA 01
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
INSPECTOR DE OBRA ING°. FELIPE PURISACA SOSA
Material Valorización Real Bruta Adelanto Pagado Coef. Incid. del Mater. Adelanto Adelanto Reintegros Amortización Amortización
(a la fecha del ANTERIOR
Denominación Cód. No. Mes Monto S/. Monto Indice mes Io Ir Coef. % en Deflacio- Utilizado que NO corresp. Adelanto)
Valorizado del Pago Aug-17 Incid. Mon. Monom. nado D Amort. Amort.
V A Ima Imo Imr C % A*Imo / Ima U = V *C*% U*(Imr - Ima) / Imo AM=U*Ima/Imo
RESERVORIOS CASERIOS 36,648.17 20-Jul-18
ACERO DE CONSTRUCCION CORRUGA 03 01 May-18 11,005.00 513.58 460.39 513.58 0.146 45.890% 9,865.24
var 02 Jun-18 7,650.51 508.81 0.00 0.00 0.00
03 Jul-18 0.00 508.81 0.00 0.00 0.00
04 Aug-18 3,374.56 512.37 226.09 0.00 252.21
05 Sep-18 0.00 525.48 0.00 0.00 0.00
06 Oct-18 41,248.23 527.89 2,763.61 85.90 3,082.90
07 Nov-18 26,291.12 531.71 1,761.49 69.37 1,965.00
08 Dec-18 10,178.86 539.69 681.98 38.68 760.77
09 Jan-19 14,666.33 542.08 982.64 60.83 1,096.17
10 Feb-19
CEMENTO PORTLAND TIPO V 23 01 May-18 2,123.07 439.25 418.10 513.58 0.146 54.110% 2,020.84
Bls 02 Jun-18 7,650.51 508.81 604.39 100.55 634.96
03 Jul-18 0.00 508.81 0.00 0.00 0.00
04 Aug-18 3,374.56 512.37 266.59 46.62 280.08
05 Sep-18 0.00 525.48 0.00 0.00 0.00
06 Oct-18 41,248.23 527.89 3,258.63 690.85 3,423.47
07 Nov-18 26,291.12 531.71 2,077.01 459.32 2,182.08
08 Dec-18 10,178.86 539.69 804.14 193.18 844.82
09 Jan-19 14,666.33 542.08 1,158.65 284.97 0.00
10 Feb-19
DÓLAR MAS INFLACION USA Y DUCTO 31 01 May-18 23,520.10 378.03 373.25 378.03 0.130 100.000% 23,222.70
02 Jun-18 7,650.51 377.94 0.00 0.00 0.00
03 Jul-18 0.00 377.94 0.00 0.00 0.00
04 Aug-18 3,374.56 378.15 438.69 0.14 444.31
05 Sep-18 0.00 378.47 0.00 0.00 0.00
06 Oct-18 41,248.23 379.12 5,362.27 15.66 5,430.94
07 Nov-18 26,291.12 382.29 3,417.85 39.01 3,461.62
08 Dec-18 10,178.86 383.50 1,323.25 19.39 1,340.20
09 Jan-19 14,666.33 383.18 1,906.62 26.31 1,931.04
10 Feb-19
01 May-18 0.00 0.00
02 Jun-18 100.55 634.96 634.96
03 Jul-18 0.00 0.00 634.96
04 Aug-18 46.76 976.60 1,611.56
05 Sep-18 0.00 0.00 1,611.56
06 Oct-18 792.41 11,937.31 13,548.87
07 Nov-18 567.69 7,608.70 21,157.57
08 Dec-18 251.25 2,945.79 24,103.36
09 Jan-19 372.10 3,027.21 27,130.57
10 Feb-19 27,130.57
11 Mar-19 27,130.57
CALCULO DE K
K = 0.060*(FMr / FMo) + 0.474*(Mr / Mo) + 0.125*(CAr / CAo) + 0.064*(Ar / Ao) + 0.066*(Tr / To) + 0.211*(Ir / Io)
Monom. Elemento Representativo Código Coef. % Ind. Base May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19
No. Inc. Aug-17 Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K
FM FLETE TERRESTRE 32 0.060 66.667% 467.18 468.41 470.47 470.47 470.47 468.39 468.39 468.39 469.40 469.40 469.40 471.42 471.42 0.00 0.00 0.00 0.00 0.00
MAQUINARIA Y EQUIPO IMPORTADO 49 33.333% 292.36 298.68 298.83 299.69 302.20 304.74 307.20 311.07 311.16 309.88 309.14 308.64 309.08 0.00 0.00 0.00 0.00 0.00
408.91 411.83 0.060 413.26 0.061 413.54 0.061 414.38 0.061 413.84 0.061 414.66 0.061 415.95 0.061 416.65 0.061 416.23 0.061 415.98 0.061 417.16 0.061 417.31 0.061 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
M MANO DE OBRA 47 0.474 100.00% 580.90 582.52 582.52 582.52 602.11 602.11 602.11 602.11 602.11 600.40 600.40 600.40 600.40 0.00 0.00 0.00 0.00 0.00
580.90 582.52 0.475 582.52 0.475 582.52 0.475 602.11 0.491 602.11 0.491 602.11 0.491 602.11 0.491 602.11 0.491 600.40 0.490 600.40 0.490 600.40 0.490 600.40 0.490 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
CA CEMENTO PORTLAND TIPO II 22 0.125 72.000% 367.30 367.30 367.30 367.30 367.30 367.30 367.30 367.30 367.30 367.30 367.30 367.30 367.30 0.00 0.00 0.00 0.00 0.00
ACERO DE CONSTRUCCION CORRUGADO 03 28.000% 460.39 513.58 508.81 512.37 525.48 527.89 531.71 539.69 542.08 537.43 536.72 530.00 529.91 0.00 0.00 0.00 0.00 0.00
393.37 408.26 0.130 406.92 0.129 407.92 0.130 411.59 0.131 412.27 0.131 413.33 0.131 415.57 0.132 416.24 0.132 414.94 0.132 414.74 0.132 412.86 0.131 412.83 0.131 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
A AGREGADO FINO 04 0.064 100.00% 554.25 545.10 546.69 547.19 548.83 550.37 551.14 553.52 554.80 558.32 560.42 563.20 562.40 0.00 0.00 0.00 0.00 0.00
554.25 545.10 0.063 546.69 0.063 547.19 0.063 548.83 0.063 550.37 0.064 551.14 0.064 553.52 0.064 554.80 0.064 558.32 0.064 560.42 0.065 563.20 0.065 562.40 0.065 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
T TUBERIA DE PVC 72 0.066 100.00% 416.90 431.66 434.23 434.41 435.02 436.21 437.54 439.71 432.82 431.72 433.33 432.33 432.33 0.00 0.00 0.00 0.00 0.00
416.90 431.66 0.068 434.23 0.069 434.41 0.069 435.02 0.069 436.21 0.069 437.54 0.069 439.71 0.070 432.82 0.069 431.72 0.068 433.33 0.069 432.33 0.068 432.33 0.068 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.211 100.00% 444.64 445.61 447.10 448.81 449.40 450.26 450.63 451.18 452.00 452.29 452.87 456.16 457.08 0.00 0.00 0.00 0.00 0.00
444.64 445.61 0.211 447.10 0.212 448.81 0.213 449.40 0.213 450.26 0.214 450.63 0.214 451.18 0.214 452.00 0.214 452.29 0.215 452.87 0.215 456.16 0.216 457.08 0.217 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
COEFICIENTE DE REAJUSTE K = 1.007 1.009 1.011 1.028 1.030 1.030 1.032 1.031 1.030 1.032 1.031 1.032 0.000 0.000 0.000 0.000 0.000
K = 0.331*(Jr / Jo) + 0.067*(Vr / Vo) + 0.117*(AAr / AAo) + 0.161*(Er / Eo) + 0.206*(Tr / To) + 0.118*(GGUr / GGUo)
Monom. Elemento Representativo Código Coef. % Ind. Base May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19
No. Inc. Aug-17 Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K
M MANO DE OBRA 47 0.331 100.00% 580.90 582.52 582.52 582.52 602.11 602.11 602.11 602.11 602.11 600.40 600.40 600.40 600.40 0.00 0.00 0.00 0.00 0.00
580.90 582.52 0.332 582.52 0.332 582.52 0.332 602.11 0.343 602.11 0.343 602.11 0.343 602.11 0.343 602.11 0.343 600.40 0.342 600.40 0.342 600.40 0.342 600.40 0.342 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
V DÓLAR (GENERAL PONDERADO) 30 0.067 47.761% 462.48 478.04 479.58 481.37 483.02 486.67 490.47 497.53 494.24 489.58 487.29 486.86 489.59 0.00 0.00 0.00 0.00 0.00
FLETE TERRESTRE 32 52.239% 467.18 468.41 470.47 470.47 470.47 468.39 468.39 468.39 469.40 469.40 469.40 471.42 471.42 0.00 0.00 0.00 0.00 0.00
464.94 473.01 0.068 474.82 0.068 475.68 0.069 476.46 0.069 477.12 0.069 478.94 0.069 482.31 0.070 481.26 0.069 479.04 0.069 477.94 0.069 478.79 0.069 480.10 0.069 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
AA ACERO DE CONSTRUCCION CORRUGADO 03 0.117 21.368% 460.39 513.58 508.81 512.37 525.48 527.89 531.71 539.69 542.08 537.43 536.72 530.00 529.91 0.00 0.00 0.00 0.00 0.00
AGREGADO FINO 04 78.632% 554.25 545.10 546.69 547.19 548.83 550.37 551.14 553.52 554.80 558.32 560.42 563.20 562.40 0.00 0.00 0.00 0.00 0.00
534.19 538.36 0.118 538.60 0.118 539.75 0.118 543.84 0.119 545.57 0.119 546.99 0.120 550.56 0.121 552.08 0.121 553.86 0.121 555.36 0.122 556.11 0.122 555.46 0.122 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
E MAQUINARIA Y EQUIPO IMPORTADO 49 0.161 100.00% 292.36 298.68 298.83 299.69 302.20 304.74 307.20 311.07 311.16 309.88 309.14 308.64 309.08 0.00 0.00 0.00 0.00 0.00
292.36 298.68 0.164 298.83 0.165 299.69 0.165 302.20 0.166 304.74 0.168 307.20 0.169 311.07 0.171 311.16 0.171 309.88 0.171 309.14 0.170 308.64 0.170 309.08 0.170 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
T TUBERIA DE PVC PARA AGUA 72 0.206 100.00% 416.90 431.66 434.23 434.41 435.02 436.21 437.54 439.71 432.82 431.72 433.33 432.33 432.33 0.00 0.00 0.00 0.00 0.00
416.90 431.66 0.213 434.23 0.215 434.41 0.215 435.02 0.215 436.21 0.216 437.54 0.216 439.71 0.217 432.82 0.214 431.72 0.213 433.33 0.214 432.33 0.214 432.33 0.214 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
GGU INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.118 100.00% 444.64 445.61 447.10 448.81 449.40 450.26 450.63 451.18 452.00 452.29 452.87 456.16 457.08 0.00 0.00 0.00 0.00 0.00
444.64 445.61 0.118 447.10 0.119 448.81 0.119 449.40 0.119 450.26 0.119 450.63 0.120 451.18 0.120 452.00 0.120 452.29 0.120 452.87 0.120 456.16 0.121 457.08 0.121 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
COEFICIENTE DE REAJUSTE K = 1.013 1.017 1.018 1.031 1.034 1.037 1.042 1.038 1.036 1.037 1.038 1.038 0.000 0.000 0.000 0.000 0.000
PTAP
K = 0.236*(Mr / Mo) + 0.221*(Ir / Io) + 0.094*(CMr / CMo) + 0.205*(FAr / FAo) + 0.092*(Ar / Ao) + 0.152*(Mr / Mo)
Monom. Elemento Representativo Código Coef. % Ind. Base May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19
No. Inc. Aug-17 Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K
M MANO DE OBRA 47 0.236 100.00% 580.90 582.52 582.52 582.52 602.11 602.11 602.11 602.11 602.11 600.40 600.40 600.40 600.40 0.00 0.00 0.00 0.00 0.00
580.90 582.52 0.237 582.52 0.237 582.52 0.237 602.11 0.245 602.11 0.245 602.11 0.245 602.11 0.245 602.11 0.245 600.40 0.244 600.40 0.244 600.40 0.244 600.40 0.244 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.221 100.00% 444.64 445.61 447.10 448.81 449.40 450.26 450.63 451.18 452.00 452.29 452.87 456.16 457.08 0.00 0.00 0.00 0.00 0.00
CALCULO DE K
RESERVORIOS
K = 0.284*(Mr / Mo) + 0.146*(CAr / CAo) + 0.080*(Fr / Fo) + 0.130*(Dr / Do) + 0.100*(Mr / Mo) + 0.260*(Ir / Io)
Monom. Elemento Representativo Código Coef. % Ind. Base May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19
No. Inc. Aug-17 Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K Indice K
M MANO DE OBRA 47 0.284 100.00% 580.90 582.52 582.52 582.52 602.11 602.11 602.11 602.11 602.11 600.40 600.40 600.40 600.40 0.00 0.00 0.00 0.00 0.00
580.90 582.52 0.285 582.52 0.285 582.52 0.285 602.11 0.294 602.11 0.294 602.11 0.294 602.11 0.294 602.11 0.294 600.40 0.294 600.40 0.294 600.40 0.294 600.40 0.294 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
V ACERO DE CONSTRUCCION CORRUGADO 03 0.146 45.890% 460.39 513.58 508.81 512.37 525.48 527.89 531.71 539.69 542.08 537.43 536.72 530.00 529.91 0.00 0.00 0.00 0.00 0.00
CEMENTO PORTLAND TIPO V 23 54.110% 418.10 439.25 439.25 439.25 439.25 439.25 439.25 439.25 439.25 439.25 439.25 439.25 439.25 0.00 0.00 0.00 0.00 0.00
437.51 473.36 0.158 471.17 0.157 472.80 0.158 478.82 0.160 479.93 0.160 481.68 0.161 485.34 0.162 486.44 0.162 484.30 0.162 483.98 0.162 480.90 0.160 480.85 0.160 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
F FLETE TERRESTRE 32 0.080 21.368% 467.18 468.41 470.47 470.47 470.47 468.39 468.39 468.39 469.40 469.40 469.40 471.42 471.42 0.00 0.00 0.00 0.00 0.00
99.83 100.09 0.080 100.53 0.081 100.53 0.081 100.53 0.081 100.09 0.080 100.09 0.080 100.09 0.080 100.30 0.080 100.30 0.080 100.30 0.080 100.73 0.081 100.73 0.081 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
D DÓLAR MAS INFLACION USA Y DUCTO DE CONCRET 31 0.130 100.00% 373.25 378.03 377.94 378.15 378.47 379.12 382.29 383.50 383.18 382.52 381.96 381.47 381.47 0.00 0.00 0.00 0.00 0.00
373.25 378.03 0.132 377.94 0.132 378.15 0.132 378.47 0.132 379.12 0.132 382.29 0.133 383.50 0.134 383.18 0.133 382.52 0.133 381.96 0.133 381.47 0.133 381.47 0.133 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
M MAQUINARIA Y EQUIPO IMPORTADO 49 0.100 100.00% 292.36 298.68 298.83 299.69 302.20 304.74 307.20 311.07 311.16 309.88 309.14 308.64 309.08 0.00 0.00 0.00 0.00 0.00
292.36 298.68 0.102 298.83 0.102 299.69 0.103 302.20 0.103 304.74 0.104 307.20 0.105 311.07 0.106 311.16 0.106 309.88 0.106 309.14 0.106 308.64 0.106 309.08 0.106 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.260 100.00% 444.64 445.61 447.10 448.81 449.40 450.26 450.63 451.18 452.00 452.29 452.87 456.16 457.08 0.00 0.00 0.00 0.00 0.00
444.64 445.61 0.261 447.10 0.261 448.81 0.262 449.40 0.263 450.26 0.263 450.63 0.264 451.18 0.264 452.00 0.264 452.29 0.264 452.87 0.265 456.16 0.267 457.08 0.267 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000 0.00 0.000
COEFICIENTE DE REAJUSTE K = 1.018 1.018 1.021 1.033 1.033 1.037 1.040 1.039 1.039 1.040 1.041 1.041 0.000 0.000 0.000 0.000 0.000
VALORIZACION DE OBRA Nº 15 31 de Octubre 2019
OBRA : “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO
PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE PIURA
UBICACIÓN : SONDOR
CONTRATISTA : CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.)
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON HUANCABAMBA (GR)
INSPECTOR DE OBRA : ING°. FELIPE PURISACA SOSA
Val. Nº Mes Valorizacion Real Valorizacion Programada Valoriz. Real Valoriz- Program. Mes K Reajuste Real Reajuste Real Reajuste Reajuste Prog. Reintegro
Acumul. Acumul. Acumul. Programado Acumul. Autorizado Neto
01 May-18 0.00 0.00 0.00 May-18 1.007 0.00 0.00
02 Jun-18 429,491.16 0.00 429,491.16 0.00 Jun-18 1.009 3,865.42 3,865.42 0.00 0.00 0.00
03 Jul-18 489,751.63 0.00 919,242.79 0.00 Jul-18 1.011 5,387.27 9,252.69 0.00 0.00 0.00
04 Aug-18 927,127.64 0.00 1,846,370.43 0.00 Jul-18 1.011 10,198.40 19,451.09 0.00 0.00 0.00
05 Sep-18 1,288,806.58 0.00 3,135,177.01 0.00 Aug-18 1.028 36,086.58 55,537.67 0.00 0.00 0.00
06 Oct-18 1,395,690.69 0.00 4,530,867.70 0.00 Sep-18 1.030 41,870.72 97,408.39 0.00 0.00 0.00
07 Nov-18 717,695.72 0.00 5,248,563.42 0.00 Oct-18 1.030 21,530.87 118,939.26 0.00 0.00 0.00
08 Dec-18 450,980.71 0.00 5,699,544.13 0.00 Nov-18 1.032 14,431.38 133,370.64 0.00 0.00 0.00
09 Jan-19 240,169.66 0.00 5,939,713.79 0.00 Dec-18 1.031 7,445.26 140,815.90 0.00 0.00 0.00
10 Feb-19 0.00 0.00 0.00 Jan-19 1.030 0.00 0.00
11 Mar-19 446,585.99 0.00 446,585.99 0.00 Feb-19 1.032 14,290.75 14,290.75 0.00 0.00 0.00
12 Apr-19 12,372.97 0.00 458,958.96 0.00 Mar-19 1.031 383.56 14,674.31 0.00 0.00 0.00
13 May-19 92,170.20 0.00 551,129.16 0.00 Apr-19 1.032 2,949.45 17,623.76 0.00 0.00 0.00
14 Jun-19 0.00 0.00
15 Oct-19 0.00 0.00
16 Nov-19 0.00 0.00
17 Dec-19 0.00 0.00
18 Jan-20 0.00 0.00
19 Feb-20 0.00 0.00
6,490,842.95 0.00 158,439.66 0.00 0.00
Valoriz. Real Valoriz- Program. Reajuste Real Reajuste Reajuste Prog. Reintegro
Val. Nº Mes Valorizacion Real Valorizacion Programada Mes K Reajuste Real
Acumul. Acumul. Acumul. Programado Acumul. Autorizado Neto
01 May-18 0.00 0.00 0.00 0.00 May-18 1.013 0.00 0.00 0.00 0.00 0.00
02 Jun-18 617,671.54 0.00 617,671.54 0.00 Jun-18 1.017 10,500.42 10,500.42 0.00 0.00 0.00
03 Jul-18 29,699.28 0.00 647,370.82 0.00 Jul-18 1.018 534.59 11,035.01 0.00 0.00 0.00
04 Aug-18 98,334.08 0.00 745,704.90 0.00 Jul-18 1.018 1,770.01 12,805.02 0.00 0.00 0.00
05 Sep-18 71,988.95 0.00 817,693.85 0.00 Aug-18 1.031 2,231.66 15,036.68 0.00 0.00 0.00
06 Oct-18 40,897.25 0.00 858,591.10 0.00 Sep-18 1.034 1,390.51 16,427.19 0.00 0.00 0.00
07 Nov-18 156,629.19 0.00 1,015,220.29 0.00 Oct-18 1.037 5,795.28 22,222.47 0.00 0.00 0.00
08 Dec-18 298,058.51 0.00 1,313,278.80 0.00 Nov-18 1.042 12,518.46 34,740.93 0.00 0.00 0.00
09 Jan-19 262,519.61 0.00 1,575,798.41 0.00 Dec-18 1.038 9,975.75 44,716.68 0.00 0.00 0.00
10 Feb-19 339,397.81 0.00 1,915,196.22 0.00 Jan-19 1.036 12,218.32 56,935.00 0.00 0.00 0.00
11 Mar-19 237,550.94 0.00 2,152,747.16 0.00 Feb-19 1.037 8,789.38 65,724.38 0.00 0.00 0.00
12 Apr-19 -757.08 0.00 2,151,990.08 0.00 Mar-19 1.038 -28.77 65,695.61 0.00 0.00 -28.77
13 May-19 187,422.77 0.00 2,339,412.85 0.00 Apr-19 1.038 7,122.07 72,817.68 0.00 0.00 0.00
14 Jun-19 59,617.47 0.00 2,399,030.32 0.00 -59,617.47 13,200.21 0.00 0.00 -59,617.47
15 Oct-19 0.00 0.00 2,399,030.32 0.00 0.00 13,200.21 0.00 0.00 0.00
16 Nov-19 0.00 0.00
17 Dec-19 0.00 0.00
18 Jan-20 0.00 0.00
19 Feb-20 0.00 0.00
Val. Nº Mes Valorizacion Real Valorizacion Programada Valoriz. Real Valoriz- Program. Mes K Reajuste Real Reajuste Real Reajuste Reajuste Prog. Reintegro
Acumul. Acumul. Acumul. Programado Acumul. Autorizado Neto
01 May-18 0.00 0.00 0.00 May-18 1.022 0.00 0.00
02 Jun-18 30,090.94 0.00 30,090.94 0.00 Jun-18 1.022 662.00 662.00 0.00 0.00 0.00
03 Jul-18 257,503.11 0.00 287,594.05 0.00 Jul-18 1.026 6,695.08 7,357.08 0.00 0.00 0.00
04 Aug-18 154,969.23 0.00 442,563.28 0.00 Jul-18 1.026 4,029.20 11,386.28 0.00 0.00 0.00
05 Sep-18 51,656.42 0.00 494,219.70 0.00 Aug-18 1.040 2,066.26 13,452.54 0.00 0.00 0.00
06 Oct-18 252,244.12 0.00 746,463.82 0.00 Sep-18 1.044 11,098.74 24,551.28 0.00 0.00 0.00
07 Nov-18 67,330.33 0.00 813,794.15 0.00 Oct-18 1.049 3,299.19 27,850.47 0.00 0.00 0.00
08 Dec-18 28,397.53 0.00 842,191.68 0.00 Nov-18 1.053 1,505.07 29,355.54 0.00 0.00 0.00
09 Jan-19 96,477.01 0.00 938,668.69 0.00 Dec-18 1.055 5,306.24 34,661.78 0.00 0.00 0.00
10 Feb-19 219,023.19 0.00 1,157,691.88 0.00 Jan-19 1.051 11,170.18 45,831.96 0.00 0.00 0.00
11 Mar-19 251,643.32 0.00 1,409,335.20 0.00 Feb-19 1.051 12,833.81 58,665.77 0.00 0.00 0.00
12 Apr-19 221,804.97 0.00 1,631,140.17 0.00 Mar-19 1.051 11,312.05 69,977.82 0.00 0.00 0.00
13 May-19 115,926.14 0.00 1,747,066.31 0.00 Apr-19 1.054 6,260.01 76,237.83 0.00 0.00 0.00
14 Jun-19 0.00 0.00
15 Oct-19 0.00 0.00
16 Nov-19 0.00 0.00
17 Dec-19 0.00 0.00
18 Jan-20 0.00 0.00
19 Feb-20 0.00 0.00
Valoriz. Real Valoriz- Program. Reajuste Real Reajuste Reajuste Prog. Reintegro
Val. Nº Mes Valorizacion Real Valorizacion Programada Mes K Reajuste Real
Acumul. Acumul. Acumul. Programado Acumul. Autorizado Neto
01 May-18 0.00 0.00 0.00 May-18 1.018 0.00 0.00
02 Jun-18 7,650.51 0.00 7,650.51 0.00 Jun-18 1.018 137.71 137.71 0.00 0.00 0.00
03 Jul-18 0.00 0.00 7,650.51 0.00 Jul-18 1.021 0.00 137.71 0.00 0.00 0.00
04 Aug-18 3,374.56 0.00 11,025.07 0.00 Jul-18 1.021 70.87 208.58 0.00 0.00 0.00
05 Sep-18 0.00 0.00 11,025.07 0.00 Aug-18 1.033 0.00 208.58 0.00 0.00 0.00
06 Oct-18 41,248.23 0.00 52,273.30 0.00 Sep-18 1.033 1,361.19 1,569.77 0.00 0.00 0.00
07 Nov-18 26,291.12 0.00 78,564.42 0.00 Oct-18 1.037 972.77 2,542.54 0.00 0.00 0.00
08 Dec-18 10,178.86 0.00 88,743.28 0.00 Nov-18 1.040 407.15 2,949.69 0.00 0.00 0.00
09 Jan-19 14,666.33 0.00 103,409.61 0.00 Dec-18 1.039 571.99 3,521.68 0.00 0.00 0.00
10 Feb-19 884.45 0.00 104,294.06 0.00 Jan-19 1.039 34.49 3,556.17 0.00 0.00 0.00
11 Mar-19 12,351.74 0.00 116,645.80 0.00 Feb-19 1.040 494.07 4,050.24 0.00 0.00 0.00
12 Apr-19 5,089.45 0.00 121,735.25 0.00 Mar-19 1.041 208.67 4,258.91 0.00 0.00 0.00
13 May-19 30,857.83 0.00 152,593.08 0.00 Apr-19 1.041 1,265.17 5,524.08 0.00 0.00 0.00
14 Jun-19 0.00 0.00
15 Oct-19 0.00 0.00
16 Nov-19 0.00 0.00
17 Dec-19 0.00 0.00
18 Jan-20 0.00 0.00
19 Feb-20 0.00 0.00
RESERVORIOS CASERIOS
Valorización Coeficientes del mes del Reintegro Acumul. Ant.
Pago del Adel. En que NO Reintegro que
Monto Reajuste NO corresp.
No. Mes Efectivo Corresponde
V K Ka D = V*A/C (K / Ka - 1)
Carta Fianza Nº BANCO Monto de la Fianza Fecha Emisión Fecha Estado de la Fianza
Incuye IGV Vencimiento
Fiel Cumplimiento de Contrato 0011-0245-9800006961-81 BBVA CONTINENTAL 1,397,739.59 24-Jul-19 14-Nov-19 PRORROGADA VIGENTE
Adelanto de Directo 0131001-2019/FG/PIURA FOGAPI 442,193.52 Amortizada Al 100%
Adelanto de Materiales 097001-2018/FG/PIURA FOGAPI 2,016,543.89 Amortizada Al 100%
INDICES UNIFICADOS
“INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION
PROYECTO : SANITARIAS DE EXCRETAS EN LOS CENTROS POBLADOS: NUEVO PROGRESO,LAGUNAS,
SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE
HUANCABAMBA - DEPARTAMENTO DE PIURA
UBICACIÓN : SONDOR
Fecha de Presup. Base: : August-17
Area Geográfica: : ZONA 1
IND. BASE
ELEMENTO CODIGO
Aug-17
01 MAY. 2018 0.00 0.00 0.00% 0.00% 0.00 0.00 0.00% 0.00% 0.00%
02 JUN. 2018 1,087,277.04 1,087,277.04 9.44% 9.44% 1,087,277.04 1,087,277.04 9.44% 9.44% 0.00%
03 JUL. 2018 779,326.90 1,866,603.94 6.76% 16.20% 779,326.91 1,866,603.95 6.76% 16.20% 0.00%
04 AGO. 2018 1,244,414.39 3,111,018.33 10.80% 27.00% 1,244,414.39 3,111,018.34 10.80% 27.00% 0.00%
05 SET. 2018 1,469,192.64 4,580,210.97 12.75% 39.75% 1,469,192.64 4,580,210.98 12.75% 39.75% 0.00%
06 OCT. 2018 1,732,453.18 6,312,664.15 15.04% 54.79% 1,732,453.18 6,312,664.16 15.04% 54.79% 0.00%
07 NOV. 2018 994,235.96 7,306,900.11 8.63% 63.42% 994,235.96 7,306,900.12 8.63% 63.42% 0.00%
08 DIC. 2018 790,946.18 8,097,846.29 6.86% 70.28% 790,947.27 8,097,847.39 6.86% 70.28% 0.00%
09 ENE. 2019 622,093.89 8,719,940.18 5.40% 75.68% 622,166.82 8,720,014.21 5.40% 75.68% 0.00% Obra Adelantada
10 FEB. 2019 559,815.42 9,279,755.60 4.86% 80.54% 559,822.95 9,279,837.16 4.86% 80.54% 0.00% Obra Adelantada
11 MAR. 2019 948,131.97 10,227,887.57 8.23% 88.77% 948,131.99 10,227,969.15 8.23% 88.77% 0.00% Obra Adelantada
12 ABR. 2019 240,176.16 10,468,063.73 2.084% 90.85% 240,176.17 10,468,145.32 2.08% 90.85% 0.00% Obra Atrasada
13 MAY. 2019 432,394.17 10,900,457.90 3.753% 94.60% 440,351.87 10,908,497.19 3.82% 94.67% 0.07% Obra Adelantada
14 JUN. 2019 187,623.55 11,088,081.45 1.628% 96.23% 188,242.85 11,096,740.04 1.63% 96.30% 0.07% Obra Adelantada
15 SET. 2019 317,482.18 11,405,563.63 2.755% 98.99% 0.00 11,096,740.04 0.00% 96.30% -2.69% Obra Atrasada
15 OCT. 2019 116,829.07 11,522,392.70 1.014% 100.00% 33,284.44 11,130,024.48 0.29% 96.59% -3.41% Obra Atrasada
16 NOV. 2019
17 DIC. 2019
18 ENE. 2020
Programado Ejecutado
RESUMEN DE LA VALORIZACION MENSUAL Nº 15 31 de Octubre 2019
CONTRATISTA CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. Monto del Presupuesto Base : S/ 13,977,395.88
CAROLINA E.I.R.L.) Fecha del Presupuesto Base : August-2017
INSPECTOR DE OBRA ING°. FELIPE PURISACA SOSA
GOBIERNO REGIONAL DE PIURA - GERENCIA SUB REGIONAL MORROPON
ENTIDAD HUANCABAMBA (GR) Monto del Presupuesto Contratado : S/ 13,977,395.88 FECHA DE PAGO
FECHA 31 de Octubre 2019 Adelanto Directo C/IGV S/ 1,397,739.59 14/05/2018
Adelanto de Materiales N°001 S/IGV S/. 1,271,186.44 7/23/2013
MONTO % SALDO
DESCRIPCIÓN CONTRATO VALORIZACIÓN AVANCE POR
(S/IGV) ANTERIOR ACTUAL ACUMULADO ACUM. VALORIZAR
A: VALORIZACIÓN CONTRACTUAL
1 O.P - CAPTACION - L.C-CDC 2,811,840.24 2,399,030.32 0.00 2,399,030.32 85.32% 412,809.92
2 Planta de Tratamiento de Agua Potable 1,747,221.02 1,747,066.31 0.00 1,747,066.31 99.99% 154.71
3 Reservorio Caserios 183,240.86 157,556.10 0.00 157,556.10 85.98% 25,684.76
4 Redes de Agua Pot. de reserv. a Cas. Sondor - UBS 6,874,554.16 6,565,826.05 33,284.44 6,599,110.49 95.99% 275,443.67
5 Impacto Ambiental 44,649.46 43,516.24 0.00 43,516.24 97.46% 1,133.22
6 Educación Sanitaria 125,844.50 125,844.50 0.00 125,844.50 100.00% 0.00
7 Equipamiento de JASS 34,171.71 34,171.71 0.00 34,171.71 100.00% 0.00
8 Monitoreo Arqueologico 23,728.81 23,728.81 0.00 23,728.81 100.00% 0.00
COSTO DIRECTO SUB TOTAL (A) 11,845,250.76 11,096,740.04 33,284.44 11,130,024.48 93.96% 715,226.28
B: REAJUSTES DE VALORIZACION
1 LINEA DE ADUCCION Y DISTRIBUCION-LETRINAS DE ARRASTRE HIDRAULICO (303UBS) 0.00 0.00
2 O.P - CAPTACION - L.C-CDC 0.00 0.00
3 PLANTA DE TRATAMIENTO DE AGUA POTABLE (PTAP) 0.00 0.00
4 RESERVORIOS CASERIOS 0.00 0.00
D. AMORTIZACIONES
AMORTIZACIONES ADEL. DIRECTO 1,184,525.08 0.00 0.00 0.00 0.00% 1,184,525.08
AMORTIZACIONES ADEL. MATERIALES 2,369,050.15 2,369,050.15 0.00 2,369,050.15 100.00% 0.00
3,553,575.23 2,369,050.15 0.00 2,369,050.15
E. RETENCIONES
GASTOS DE LICITACIÓN 0.00 0.00 0.00
MULTA POR ATRASO DE OBRA 0.00 0.00 0.00
TOTAL (E) 0.00 0.00 0.00
OBRA: “INSTALACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIAS DE EXCRETAS EN LOS CENTROS
POBLADOS: NUEVO PROGRESO,LAGUNAS, SHILCAYA, EL ROSARIO Y AGUAPAMPA DEL DISTRITO DE SONDOR - PROVINCIA DE
HUANCABAMBA - DEPARTAMENTO DE PIURA
CTTA: CONSORCIO EL ROSARIO (CASTILLO RUIZ JOSE HUMBERTO - C. S. CAROLINA E.I.R.L.)
Valorización 31 de Octubre 2019