t1=0.70m
S = 1.50 m
t2=0.70m
T = 1.50 m
DATOS
Pd = 7.76 Tn
Pl = 0.44 Tn
hf = 1.50 m
γs = 1.85 Tn/m3
f'c = 210 Kg/cm2
f'y = 4200 Kg/cm2
qa = 1.17 Kg/cm2
γc = 2.40 Tn/m3
DIMENSIONAMIENTO
Asumimos
h= 0.40 m d= 0.30 m
Hs = 1.10 m
qe = qa - γs x Hs - γc x h qe = 8.71 Tn/m2
T S Total
A = (Pd+Pl)/qe = 0.94 m2 Area = 0.97 m x 0.97 m 0.94 m2
0.97 m Asumimos Area = 1.50 m x 1.50 m 2.25 m2
Lv1 = 0.40
Reacciòn Neta del terreno Lv2 = 0.40 ok
Wu = Pu/A
Pu = 1.4xPd + 1.7xPl = 11.61 Tn Wu = 0.52 Kg/cm2
241.6 Wu = 5.2 Tn/m2
(1) = (2)
527.43 d2 + 372.81 d -9.08 = 0
d = 0.024 m
d= -0.730 m Conforme
Usamos h= 0.40 m
Recubrimiento 7.50 cm
Acero ɸ 5/8 d= 30.91 cm
Verificación por Cortante
As = Mu
ɸ*f'y*(d-a/2)
As = 0.53 cm2
a= 0.08
Espaciamiento (s)
s= 0.23 m
En la dirección Transversal
Espaciamiento (s)
s= 0.23 m
t1=0.70m
5 (unidades)
S = 1.50 m
@ 0.23 m
t2=0.70m
T = 1.50 m
5 (unidades)
@ 0.23 m
Ld = 40.17 m Conforme
Longitud de Desarrollo Lde = 32.14 m
Ldisponible = 32.50 m Conforme
Pn = Pu/ɸ = 16.59 Tn
Pnb = 0.85*f'c*Ao
t1=0.70m
S = 1.50 m
Xo t2=0.70m
T = 1.50 m
Ao = √(A2/A1)*Aco1 ≤ 2Aco1
Xo = 1.50 m
A2 = 2.25 m2
√(A2/A1) = 2.14 m
Ao=2*Ac Pn<Pnb
Pnb = 1749.30 Tn Conforme
DISEÑO DE ZAPATA 2 - BLOQUE A - COLUMNAS T (44-45-54-55)
t1=0.70m
S = 1.35 m
t2=0.50m
T = 1.55 m
DATOS
Pd = 10.95 Tn
Pl = 1.06 Tn
hf = 1.50 m
γs = 1.85 Tn/m3
f'c = 210 Kg/cm2
f'y = 4200 Kg/cm2
qa = 1.17 Kg/cm2
γc = 2.40 Tn/m3
DIMENSIONAMIENTO
Asumimos
h= 0.40 m d= 0.30 m
Hs = 1.10 m
qe = qa - γs x Hs - γc x h qe = 6.21 Tn/m2
T S Total
A = (Pd+Pl)/qe = 1.94 m2 Area = 1.49 m x 1.29 m 1.93 m2
1.39 m Asumimos Area = 1.55 m x 1.35 m 2.09 m2
Lv1 = 0.43
Reacciòn Neta del terreno Lv2 = 0.43 ok
Wu = Pu/A
Pu = 1.4xPd + 1.7xPl = 17.13 Tn Wu = 0.82 Kg/cm2
241.6 Wu = 8.2 Tn/m2
(1) = (2)
530.46 d2 + 323.19 d -14.27 = 0
d = 0.041 m
d= -0.651 m Conforme
Usamos h= 0.40 m
Recubrimiento 7.50 cm
Acero ɸ 5/8 d= 30.91 cm
Verificación por Cortante
As = Mu
ɸ*f'y*(d-a/2)
As = 0.85 cm2
a= 0.15
Espaciamiento (s)
s= 0.29 m
En la dirección Transversal
Espaciamiento (s)
s= 0.25 m
t1=0.70m
5 (unidades)
S = 1.35 m
@ 0.25 m
t2=0.50m
T = 1.55 m
4 (unidades)
@ 0.29 m
Ld = 40.17 m Conforme
Longitud de Desarrollo Lde = 32.14 m
Ldisponible = 35.00 m Conforme
Pn = Pu/ɸ = 24.47 Tn
Pnb = 0.85*f'c*Ao
t1=0.70m
S = 1.35 m
Xo t2=0.50m
T = 1.55 m
Ao = √(A2/A1)*Aco1 ≤ 2Aco1
Xo = 1.11 m
A2 = 1.72 m2
√(A2/A1) = 2.21 m
Ao=2*Ac Pn<Pnb
Pnb = 1249.50 Tn Conforme
DISEÑO DE ZAPATA 3 RECTANGULAR - BLOQUE A (47-48-51-52-46-49)
t1=0.25m
S = 1.45 m
t2=0.60m
T = 1.10 m
DATOS
Pd = 8.32 Tn
Pl = 0.96 Tn
hf = 1.50 m
γs = 1.85 Tn/m3
f'c = 210 Kg/cm2
f'y = 4200 Kg/cm2
qa = 1.17 Kg/cm2
γc = 2.40 Tn/m3
DIMENSIONAMIENTO
Asumimos
h= 0.40 m d= 0.30 m
Hs = 1.10 m
qe = qa - γs x Hs - γc x h qe = 6.21 Tn/m2
T S Total
A = (Pd+Pl)/qe = 1.50 m2 Area = 1.05 m x 1.40 m 1.46 m2
1.22 m Asumimos Area = 1.10 m x 1.45 m 1.60 m2
Lv1 = 0.43
Reacciòn Neta del terreno Lv2 = 0.43 ok
Wu = Pu/A
Pu = 1.4xPd + 1.7xPl = 13.28 Tn Wu = 0.83 Kg/cm2
241.6 Wu = 8.3 Tn/m2
(1) = (2)
530.60 d2 + 229.04 d -12.03 = 0
d = 0.047 m
d= -0.479 m Conforme
Usamos h= 0.40 m
Recubrimiento 7.50 cm
Acero ɸ 5/8 d= 30.91 cm
Verificación por Cortante
As = Mu
ɸ*f'y*(d-a/2)
As = 0.93 cm2
a= 0.15
Espaciamiento (s)
s= 0.22 m
En la dirección Transversal
Espaciamiento (s)
s= 0.21 m
t1=0.25m
4 (unidades)
S = 1.45 m
@ 0.21 m
t2=0.60m
T = 1.10 m
5 (unidades)
@ 0.22 m
Ld = 40.17 m Conforme
Longitud de Desarrollo Lde = 32.14 m
Ldisponible = 35.00 m Conforme
Pn = Pu/ɸ = 18.97 Tn
Pnb = 0.85*f'c*Ao
t1=0.25m
S = 1.45 m
Xo t2=0.60m
T = 1.10 m
Ao = √(A2/A1)*Aco1 ≤ 2Aco1
Xo = 2.64 m
A2 = 2.90 m2
√(A2/A1) = 4.40 m
Ao=2*Ac Pn<Pnb
Pnb = 535.50 Tn Conforme
DISEÑO DE ZAPATA 4 RECTANGULAR - BLOQUE A (41-42)
t1=0.25m
S = 1.40 m
t2=0.60m
T = 1.05 m
DATOS
Pd = 6.59 Tn
Pl = 0.63 Tn
hf = 1.50 m
γs = 1.85 Tn/m3
f'c = 210 Kg/cm2
f'y = 4200 Kg/cm2
qa = 1.17 Kg/cm2
γc = 2.40 Tn/m3
DIMENSIONAMIENTO
Asumimos
h= 0.40 m d= 0.30 m
Hs = 1.10 m
qe = qa - γs x Hs - γc x h qe = 6.21 Tn/m2
T S Total
A = (Pd+Pl)/qe = 1.16 m2 Area = 0.90 m x 1.25 m 1.13 m2
1.08 m Asumimos Area = 1.05 m x 1.40 m 1.47 m2
Lv1 = 0.40
Reacciòn Neta del terreno Lv2 = 0.40 ok
Wu = Pu/A
Pu = 1.4xPd + 1.7xPl = 10.30 Tn Wu = 0.70 Kg/cm2
241.6 Wu = 7.0 Tn/m2
(1) = (2)
529.27 d2 + 227.92 d -9.25 = 0
d = 0.037 m
d= -0.468 m Conforme
Usamos h= 0.40 m
Recubrimiento 7.50 cm
Acero ɸ 5/8 d= 30.91 cm
Verificación por Cortante
As = Mu
ɸ*f'y*(d-a/2)
As = 0.67 cm2
a= 0.11
Espaciamiento (s)
s= 0.31 m
En la dirección Transversal
Espaciamiento (s)
s= 0.34 m
t1=0.25m
3 (unidades)
S = 1.40 m
@ 0.34 m
t2=0.60m
T = 1.05 m
4 (unidades)
@ 0.31 m
Ld = 40.17 m Conforme
Longitud de Desarrollo Lde = 32.14 m
Ldisponible = 32.50 m Conforme
Pn = Pu/ɸ = 14.71 Tn
Pnb = 0.85*f'c*Ao
t1=0.25m
S = 1.40 m
Xo t2=0.60m
T = 1.05 m
Ao = √(A2/A1)*Aco1 ≤ 2Aco1
Xo = 2.52 m
A2 = 2.65 m2
√(A2/A1) = 4.20 m
Ao=2*Ac Pn<Pnb
Pnb = 535.50 Tn Conforme
DISEÑO DE ZAPATA 5 RECTANGULAR - BLOQUE A (7-8-1-3-6-9)
t1=0.30m
S = 1.10 m
t2=0.30m
T = 1.10 m
DATOS
Pd = 6.01 Tn
Pl = 0.42 Tn
hf = 1.50 m
γs = 1.85 Tn/m3
f'c = 210 Kg/cm2
f'y = 4200 Kg/cm2
qa = 1.17 Kg/cm2
γc = 2.40 Tn/m3
DIMENSIONAMIENTO
Asumimos
h= 0.40 m d= 0.30 m
Hs = 1.10 m
qe = qa - γs x Hs - γc x h qe = 6.21 Tn/m2
T S Total
A = (Pd+Pl)/qe = 1.04 m2 Area = 1.02 m x 1.02 m 1.04 m2
1.02 m Asumimos Area = 1.10 m x 1.10 m 1.21 m2
Lv1 = 0.40
Reacciòn Neta del terreno Lv2 = 0.40 ok
Wu = Pu/A
Pu = 1.4xPd + 1.7xPl = 9.13 Tn Wu = 0.75 Kg/cm2
241.6 Wu = 7.5 Tn/m2
(1) = (2)
529.81 d2 + 161.21 d -8.45 = 0
d = 0.046 m
d= -0.350 m Conforme
Usamos h= 0.40 m
Recubrimiento 7.50 cm
Acero ɸ 5/8 d= 30.91 cm
Verificación por Cortante
As = Mu
ɸ*f'y*(d-a/2)
As = 0.57 cm2
a= 0.12
Espaciamiento (s)
s= 0.21 m
En la dirección Transversal
Espaciamiento (s)
s= 0.21 m
t1=0.30m
4 (unidades)
S = 1.10 m
@ 0.21 m
t2=0.30m
T = 1.10 m
4 (unidades)
@ 0.21 m
Ld = 40.17 m Conforme
Longitud de Desarrollo Lde = 32.14 m
Ldisponible = 32.50 m Conforme
Pn = Pu/ɸ = 13.04 Tn
Pnb = 0.85*f'c*Ao
t1=0.30m
S = 1.10 m
Xo t2=0.30m
T = 1.10 m
Ao = √(A2/A1)*Aco1 ≤ 2Aco1
Xo = 1.10 m
A2 = 1.21 m2
√(A2/A1) = 3.67 m
Ao=2*Ac Pn<Pnb
Pnb = 321.30 Tn Conforme
DISEÑO DE VIGAS DE CONEXIÓN - BLOQUE A - EJE A-F
50 46
P1 P2
hf
hz
Re 4.00 m.
L1
σ= 1.17 Kg/cm2
hf= 1.50 m
jm= 1.85 Tn/m3
f'c= 210 Kg/cm2
f'y= 4200 Kg/cm2
s/c = 0.20 Tn/m2
Pd= 7.76 Tn Pd= 7.69 Tn
Pl= 0.44 Tn Pl= 0.67 Tn
P1= 8.2 Tn P2= 8.36 Tn
0.57 m
0.07 m = 0.29 m
Entonces usamos:
b h
V-C 0.25 x 0.60 m2
Estimamos
σn = 8.725 Tn/m2
Az = 1.13 m2 T = 2*S
S= 0.75 m
Preliminar
T= 1.50 m
T T=2S
S
Dimensiones Finales de zapata S = 0.75 m T = 1.50 m
Pu = 1.4Pd + 1.7Pl
Pu= 11.612 Tn
Wv = 0.36 Tn/m
ΣM2=0
Ru= 12.54 Tn Wnu = Ru/S
Wnu= 16.72 Tn/m
Vx=(Wnu-Wv)Xo-Pu=0
Xo= 0.71 < S OK¡
Mumax = (Wnu-Wv)Xo2/2-Pu(Xo-T1/2)
0.00453
OK
0.00333
As = 4.33 cm2
Vc = 0.53*√f'c*10*b*d = 10.08 Tn OK
Debe ser mayor
Estribos de Montaje
S = 36*Ø = 57.16 cm
Usamos Ø 3/8 @ 50.00 cm
Diseño Final
S = 0.75 m
Viga de Conexión
h = 50.00 cm 3 Ø 5/8
4 Ø 5/8
T = 1.50 m
0.60 cm
3 Ø 5/8
b = 0.25 cm
10 Ø 5/8
DISEÑO DE VIGAS DE CONEXIÓN - BLOQUE A - EJE C-D
47 51
P1 P2
hf
hz
Re 4.00 m.
L1
σ= 1.17 Kg/cm2
hf= 1.50 m
jm= 1.85 Tn/m3
f'c= 210 Kg/cm2
f'y= 4200 Kg/cm2
s/c = 0.20 Tn/m2
Pd= 8.32 Tn Pd= 7.9 Tn
Pl= 0.96 Tn Pl= 0.61 Tn
P1= 9.28 Tn P2= 8.51 Tn
0.57 m
0.07 m = 0.29 m
Entonces usamos:
b h
V-C 0.25 x 0.60 m2
Estimamos
σn = 8.725 Tn/m2
Az = 1.28 m2 T = 2*S
S= 0.80 m
Preliminar
T= 1.60 m
T T=2S
S
Dimensiones Finales de zapata S = 0.73 m T = 1.45 m
Pu = 1.4Pd + 1.7Pl
Pu= 13.28 Tn
Wv = 0.36 Tn/m
ΣM2=0
Ru= 15.08 Tn Wnu = Ru/S
Wnu= 20.80 Tn/m
Vx=(Wnu-Wv)Xo-Pu=0
Xo= 0.65 < S OK¡
Mumax = (Wnu-Wv)Xo2/2-Pu(Xo-T1/2)
0.00453
OK
0.00333
As = 4.33 cm2
Vc = 0.53*√f'c*10*b*d = 10.08 Tn OK
Debe ser mayor
Estribos de Montaje
S = 36*Ø = 57.16 cm
Usamos Ø 3/8 @ 50.00 cm
Diseño Final
S = 0.73 m
Viga de Conexión
h = 50.00 cm 3 Ø 5/8
4 Ø 5/8
T = 1.45 m
0.60 cm
3 Ø 5/8
b = 0.25 cm
10 Ø 5/8
DISEÑO DE VIGAS DE CONEXIÓN - BLOQUE A - EJE 4
54 51
P1 P2
hf
hz
Re 4.05 m.
L1
σ= 1.17 Kg/cm2
hf= 1.50 m
jm= 1.85 Tn/m3
f'c= 210 Kg/cm2
f'y= 4200 Kg/cm2
s/c = 0.20 Tn/m2
Pd= 10.95 Tn Pd= 7.9 Tn
Pl= 0.94 Tn Pl= 0.61 Tn
P1= 11.89 Tn P2= 8.51 Tn
0.58 m
0.09 m = 0.29 m
Entonces usamos:
b h
V-C 0.25 x 0.60 m2
Estimamos
σn = 8.725 Tn/m2
Az = 1.64 m2 T = 2*S
S= 0.90 m
Preliminar
T= 1.81 m
T T=2S
S
Dimensiones Finales de zapata S = 0.78 m T = 1.35 m
Pu = 1.4Pd + 1.7Pl
Pu= 16.928 Tn
Wv = 0.36 Tn/m
ΣM2=0
Ru= 18.25 Tn Wnu = Ru/S
Wnu= 23.55 Tn/m
Vx=(Wnu-Wv)Xo-Pu=0
Xo= 0.73 < S OK¡
Mumax = (Wnu-Wv)Xo2/2-Pu(Xo-T1/2)
0.00453
OK
0.00333
As = 4.33 cm2
Vc = 0.53*√f'c*10*b*d = 10.08 Tn OK
Debe ser mayor
Estribos de Montaje
S = 36*Ø = 57.16 cm
Usamos Ø 3/8 @ 50.00 cm
Diseño Final
S = 0.78 m
Viga de Conexión
h = 50.00 cm 3 Ø 5/8
4 Ø 5/8
T = 1.35 m
0.60 cm
3 Ø 5/8
b = 0.25 cm
10 Ø 5/8
DISEÑO DE VIGAS DE CONEXIÓN - BLOQUE A - EJE 2
44 39
P1 P2
hf
hz
Re 4.05 m.
L1
σ= 1.17 Kg/cm2
hf= 1.50 m
jm= 1.85 Tn/m3
f'c= 210 Kg/cm2
f'y= 4200 Kg/cm2
s/c = 0.20 Tn/m2
Pd= 10.49 Tn Pd= 6.83 Tn
Pl= 1.06 Tn Pl= 0.44 Tn
P1= 11.55 Tn P2= 7.27 Tn
0.58 m
0.09 m = 0.29 m
Entonces usamos:
b h
V-C 0.25 x 0.60 m2
Estimamos
σn = 8.725 Tn/m2
Az = 1.59 m2 T = 2*S
S= 0.89 m
Preliminar
T= 1.78 m
T T=2S
S
Dimensiones Finales de zapata S = 0.78 m T = 1.35 m
Pu = 1.4Pd + 1.7Pl
Pu= 16.488 Tn
Wv = 0.36 Tn/m
ΣM2=0
Ru= 17.77 Tn Wnu = Ru/S
Wnu= 22.93 Tn/m
Vx=(Wnu-Wv)Xo-Pu=0
Xo= 0.73 < S OK¡
Mumax = (Wnu-Wv)Xo2/2-Pu(Xo-T1/2)
0.00453
OK
0.00333
As = 4.33 cm2
Vc = 0.53*√f'c*10*b*d = 10.08 Tn OK
Debe ser mayor
Estribos de Montaje
S = 36*Ø = 57.16 cm
Usamos Ø 3/8 @ 50.00 cm
Diseño Final
S = 0.78 m
Viga de Conexión
h = 50.00 cm 3 Ø 5/8
4 Ø 5/8
T = 1.35 m
0.60 cm
3 Ø 5/8
b = 0.25 cm
10 Ø 5/8
DISEÑO DE VIGAS DE CONEXIÓN - BLOQUE A - EJE 1
7 8
P1 P2
hf
hz
Re 4.35 m.
L1
σ= 1.17 Kg/cm2
hf= 1.50 m
jm= 1.85 Tn/m3
f'c= 210 Kg/cm2
f'y= 4200 Kg/cm2
s/c = 0.20 Tn/m2
Pd= 6.01 Tn Pd= 6.01 Tn
Pl= 0.42 Tn Pl= 0.42 Tn
P1= 6.43 Tn P2= 6.43 Tn
0.62 m
0.05 m = 0.31 m
Entonces usamos:
b h
V-C 0.25 x 0.50 m2
Estimamos
σn = 8.725 Tn/m2
Az = 0.88 m2 T = 2*S
S= 0.66 m
Preliminar
T= 1.33 m
T T=2S
S
Dimensiones Finales de zapata S = 0.55 m T = 1.10 m
Pu = 1.4Pd + 1.7Pl
Pu= 9.128 Tn
Wv = 0.30 Tn/m
ΣM2=0
Ru= 10.26 Tn Wnu = Ru/S
Wnu= 18.65 Tn/m
Vx=(Wnu-Wv)Xo-Pu=0
Xo= 0.50 < S OK¡
Mumax = (Wnu-Wv)Xo2/2-Pu(Xo-T1/2)
0.00559
OK
0.00333
As = 3.51 cm2
Vc = 0.53*√f'c*10*b*d = 8.16 Tn OK
Debe ser mayor
Estribos de Montaje
S = 36*Ø = 57.16 cm
Usamos Ø 3/8 @ 50.00 cm
Diseño Final
S = 0.55 m
Viga de Conexión
h = 50.00 cm 3 Ø 5/8
4 Ø 5/8
T = 1.10 m
0.50 cm
3 Ø 5/8
b = 0.25 cm
10 Ø 5/8