DISEÑO DE MURO DE CONTENCION PARTE CENTRAL

A) DIMENSIONAMIENTO:

Hp = 4.00 m
FSD = 1.5
FSV = 1.75
Peso especifico suelo o Agua=(gs)= 1.70 Tn/m³
Angulo de Friccion (ø)= 29.50 º
Presion admisible de terreno=(s t) 1.86 Kg/cm²
f 'c= 210 kg/cm²
fy = 4200 kg/cm²
recub. pantalla= 4.00 cm
recub. cimentación= 7.50 cm
Peso especifico del concreto (wc) = 2.40 Tn/m³

Para concreto vaciado in situ :


Coeficiente Friccion: f =tg ø= 0.57

debe ser < = 0.6, por lo tanto asumimos

f= 0.57

1. DIMENSIONAMIENTO DE LA PANTALLA

2
Ka = tg (45 - Ø/2)= 0.340
Ka x gs = 0.578 Ton/m³

T1 = 0.25 m

Mu = 1.7 M = 1.7 (Ka ss) Hp^3/6 = 10.48 Ton x m

2
Mu = 0.9 x b x d' x f´c x w x ( 1 - 0.59w ) w = ro x fy / fc = 0.08

Despejando, d= 26.98 cm

Refuerzo flexion Dvarilla= 1/2 "

T2 = d + recub+(Dvarilla/2) = 31.61 cm

USAR T2 = 0.4 m d= 35.37 cm


Pág. 2

DISEÑO DE MURO DE CONTENCION PARTE CENTRAL

2. VERIFICACION POR CORTE

Vdu = 1.7 Vd = 1.7 x 0.5 x (Ka x ss) x (hp-d)2 = 6.53 Ton

Vu / Ø = 7.69 Ton

Vc=0.53 x ( fc1/2 ) x b x d = 27.16 Ton

Si As se traslapa en la base:

Vce=2/3Vc = 18.11 Ton > Vu / Ø = 7.69 CONFORME

3. DIMENSIONAMIENTO DE LA ZAPATA

Hz = T2 + 5 cm = 45 cm

Po lo tanto : H = Hp + Hz = 4.45 m

- B1 / H >= FSD x (Ka. ss)/(2.sm.f) = 0.383

B1 > = 1.71m

B1 = 1.71 + (T2-T1)/2 =

B1 = 1.78m

USAR B1 = 2.00 m

- B2 / H >= (fxFSD)/(3 x FSD) - B1/(2H)= -0.005

B2 > = -0.02m

Valor minimo de B2 = Hz = 0.45m

USAR B2 = 0.50
Pág. 3

DISEÑO DE MURO DE CONTENCION PARTE CENTRAL

B) VERIFICACIONES

DATOS
Hp = 4.00 m
Hz = 0.45 m
B1 = 2.00 m
B2 = 0.50 m
T1 = 0.25 m
T2 = 0.40 m

P PESOS (Ton) Brazo Giro(m) P*X


P1 2.70 1.250 3.38
P2 2.40 0.775 1.86
P3 0.72 0.600 0.43
P4 10.88 1.700 18.50
TOTAL 16.70 4.325 24.16
N Mr

2
Ka = tg ( 45 - Ø / 2 ) = 0.340

Ha=1/2 x (Ka x gs) x H =


2
5.725 Ma= 8.49 T-m

VERIFICACION AL DESLIZAMIENTO Y AL VOLTEO

FSD = Hr / Ha = f * N / Ha = 1.65 > 1.5 CONFORME


FSV = Mr / Ma = 2.85 > 1.75 CONFORME

VERIFICACION DE PRESIONES EN EL TERRENO

Xo = ( Mr - Ma ) / N = 0.94 m

e = B / 2 - Xo = 0.31 m
B/6 = 0.42 m
e= 0.31 > B/6 CONFORME

q1 = N / B (1 + 6*e/B ) = 11.68 Ton/m²


q2 = N / B (1 - 6*e/B ) = 1.68 Ton/m²
q mayor = 11.68 < σt = 18.60 Ton/m² CONFORME