RESUMEN ITEMIZADO DE CONTRATO

HORAS HOMBRE

ITEM DESCRIPCION BASE LINE BUDGETED


B.1 00 CIVIL Y MOVIMIENTO DE TIERRA 223,873.79 223,873.79
B.2 10 CONCRETO 369,194.29 369,194.29
B.3 20 ACERO ESTRUCTURAL 99,667.20 99,667.20
B.4 30 ARQUITECTURA 0.00 0.00
B.5 40 MAQUINAS Y EQUIPAMIENTO 419,244.35 419,244.35
B.6 50 TUBERIAS 115,651.11 115,651.11
B.7 60 ELECTRICIDAD 266,184.76 266,184.76
B.8 70 INSTRUMENTACION Y CONTROL 21,826.56 21,826.56
B.9 81 PINTURA Y RECUBRIMIENTO 0.00 0.00
B.10 83 MODULARIZACION 224,002.33 224,002.33
TOTAL

CONSORCIO SACYR - AJANI


CANTIADADES

ACTUAL REMAINING BASE LINE BUDGETED ACTUAL


0.00 223,873.79 644,337.75 644,337.75 0.00
0.00 369,194.29 2,490,897.74 2,490,897.74 0.00
0.00 99,667.20 2,088.85 2,088.85 0.00
0.00 0.00 0.00 0.00 0.00
0.00 419,244.35 356,318.36 356,318.36 0.00
0.00 115,651.11 26,049.41 26,049.41 0.00
0.00 266,184.76 342,881.00 342,881.00 0.00
0.00 21,826.56 929.00 929.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 224,002.33 892.00 892.00 0.00
1,739,644.38 TOTAL
COSTO

REMAINING BASE LINE BUDGETED ACTUAL REMAINING


644,337.75 USD 8,507,559.21 USD 8,507,559.21 USD - USD 8,507,559.21
2,490,897.74 USD 10,867,035.05 USD 10,867,035.05 USD - USD 10,867,035.05
2,088.85 USD 1,050,960.23 USD 1,050,960.23 USD - USD 1,050,960.23
0.00 USD - USD - USD - USD -
356,318.36 USD 4,161,454.73 USD 4,161,454.73 USD - USD 4,161,454.73
26,049.41 USD 2,740,942.94 USD 2,740,942.94 USD - USD 2,740,942.94
342,881.00 USD 4,043,634.90 USD 4,043,634.90 USD - USD 4,043,634.90
929.00 USD 341,121.02 USD 341,121.02 USD - USD 341,121.02
0.00 USD - USD - USD - USD -
892.00 USD 4,360,483.77 USD 4,360,483.77 USD - USD 4,360,483.77
3,864,394.12 TOTAL USD 36,073,191.84
Costos Anteriores
8,122,638.38
11,074,688.54
2,346,318.48
0.00
9,605,980.09
4,693,007.50
4,167,885.80
338,369.55
0.00
4,456,590.40
DISCIPLINA
SUBAREA
PAQUETE

PARTIDA
FRENTE
AREA
FASE

TMI
A B C D E F TMI H
EARLY WORKS
EXECUTION GENERALES
2000 GENERAL
2000 - General
20100GE - Temporary Office, Workshops & Facilities Erection
20000GE0000 - Implantacion
IMPLANTACION A.90.10.001 - - Movilización de Instalaciones / Preparación
IMPLANTACION
IMPLANTACION A.91.10.002 - - Instalación del Campamento de Construcción (Contratista)
IMPLANTACION
CONSTRUCTION
EXECUTION FRONT 01
2000 GENERAL (No existe en BoQ)
2010 - Mine General Works (No existe en BoQ)
2010002 - Access Road Overland Conveyor Tunnel Inlet Portal
20100020000 - Civil Works
EXCAVACION 00.20.003.0001 - Montaje / Ejecución - Excavación de Escarpe
EXCAVACION
EXCAVACION 00.30.004.0002 - Montaje / Ejecución - Relleno Masivo Clase B
EXCAVACION
EXCAVACION 00.30.007.0001 - Montaje / Ejecución - Preparación de Subrasante
EXCAVACION
RELLENO 00.40.002.0001 - - Afirmado granular para plataformas y caminos
RELLENO
EXCAVACION 00.40.007.0001 - Montaje / Ejecución - Pretil de seguridad h=0,5m
EXCAVACION
2010013 - Trench Excavation for Underground Mine Area
20100130000 - Civil Works (No se encuentra en Bill Quantity)
2010014 - Electrical Utilities Bulk / Lighting Quellaveco Area
20100140006 - Electrical Works (Bill Quantity menciona 2000/2010)
CONDUIT 60.20.002.0004 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0007 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0043 - Montaje / Ejecución - Conduit directamente enterrado, acero ga
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0044 - Montaje / Ejecución - Conduit directamente enterrado, acero ga
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0058 - Montaje / Ejecución - Conduit en banco de ductos, PVC Schedule
CONDUIT
CONDUIT
CONDUIT
CABLE 60.30.001.6505 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.6512 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.6513 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.6514 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.9113 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
CABLE 60.30.001.9114 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
PUESTA A TIERRA 60.40.001.0001 - Montaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0001 - Montaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PARARRAYOS 60.40.006.0001 - Montaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", c
PARARRAYOS
PARARRAYOS
PARARRAYOS
PARARRAYOS 60.40.006.0004 - Montaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", c
PARARRAYOS
PARARRAYOS
PARARRAYOS
PARARRAYOS 60.40.006.0005 - Montaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", c
PARARRAYOS
PARARRAYOS
PARARRAYOS
CABLE 60.50.001.6505 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6512 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6513 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6514 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.9113 - Montaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.9114 - Montaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE
CABLE
CABLE
CABLE
CABLE
ILUMINACION 60.60.005.0073 - Montaje / Ejecución - Equipo alumbrado público (1 unidad), LED
ILUMINACION
ILUMINACION
ILUMINACION
ILUMINACION 60.60.005.0202 - Montaje / Ejecución - Corona móvil de iluminación de 10 lumina
ILUMINACION
ILUMINACION
ILUMINACION
ILUMINACION 60.60.005.0203 - Montaje / Ejecución - Corona móvil de iluminación de 3 luminar
ILUMINACION
ILUMINACION
ILUMINACION
2010015 - Final Grading Area 2000 ( Excluded Area 2810)
20100150000 - Civil Works
RELLENO 00.30.007.0001 - Montaje / Ejecución - Preparación de Subrasante
RELLENO
RELLENO 00.40.002.0001 - - Afirmado granular para plataformas y caminos
RELLENO
2040 - Mine Drainage (No existe en CWP List, no pertenece a K170)
2040002 - Mine Water Management Part I
20400020004 - Mechanical Works
40.60.001.1711 - Desmontaje - BOMBA CENTRIFUGA HORIZONTAL AGUA RECUPE

40.60.001.1712 - Desmontaje - MOTOR ELECTRICO BOMBA CENTRIFUGA HORIZON

40.60.001.1713 - Desmontaje - BOMBA CENTRIFUGA HORIZONTAL AGUA RECUPE

40.60.001.1714 - Desmontaje - MOTOR ELECTRICO BOMBA CENTRIFUGA HORIZON

2600 PRIMARY CRUSHER


2610 - Primary Crusher Building
2610002 - Primary Crusher Building
26100020000 - Civil Works
EXCAVACION 00.20.003.0001 - Montaje / Ejecución - Excavación de Escarpe
EXCAVACION
EXCAVACION 00.25.001.0001 - Grounding system excavation
EXCAVACION
EXCAVACION 00.25.002.0002 - Burried Conduit excavation
EXCAVACION
RELLENO 00.30.001.0007 - Montaje/Ejecución - Cama de Apoyo
RELLENO
RELLENO 00.30.002.0001 - Grounding system backfill and compaction
RELLENO
RELLENO 00.30.002.0002 - Burried conduit backfill and compaction
RELLENO
26100020001 - Concrete Works
PERNO 10.20.001.0001 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0002 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0101 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0102 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0003 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0004 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0103 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0104 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.2018 - Montaje/Ejecución - Perno de anclaje especial AISI 1020 Diámet
PERNO
PERNO
PERNO
PERNO 10.20.002.0001 - Suministro - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
PERNO 10.20.002.0002 - Montaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
PERNO 10.20.002.0202 - Montaje/Ejecución - Insertos especiales ASTM A36 Peso ≥ 200 k
PERNO
PERNO
PERNO
MORTERO NIVELAC10.30.001.0001 - Suministro - Mortero de nivelación cementicio sin retracción
MORTERO NIVELACION
MORTERO NIVELAC10.30.001.0002 - Montaje/Ejecución - Mortero de nivelación cementicio sin retrac
MORTERO NIVELACION
MORTERO NIVELACION
MORTERO NIVELACION
MORTERO NIVELAC10.30.001.0003 - Suministro - Mortero de nivelación epóxico
MORTERO NIVELACION
MORTERO NIVELAC10.30.001.0004 - Montaje/Ejecución - Mortero de nivelación epóxico
MORTERO NIVELACION
MORTERO NIVELACION
MORTERO NIVELACION
ACERO REFUERZO 10.40.001.0001 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0002 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0003 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0005 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0006 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0007 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0009 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0010 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0020 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0021 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0022 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0023 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0026 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0027 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0028 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
CONCRETO 10.40.002.2801 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2802 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2803 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.3507 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.3509 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.3510 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.3520 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.3521 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.3522 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.3523 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.3526 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.3527 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.3528 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.3540 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.60.002.1061 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.60.002.1062 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
2610003 - Retainig Wall and Structural Back Fill
26100030000 - Civil Works
RELLENO 00.30.003.0002 - Montaje / Ejecución - Relleno estructural para muro TEM, Tmáx
RELLENO
RELLENO 00.50.005.0005 - Montaje / Ejecución - Muro de tierra reforzada (TEM)
RELLENO
26100030001 - Concrete Works (Con mediciones iguales a "0" en Bill Quantity)
CONCRETO 10.20.001.0001 - Montaje / Ejecución - Relleno estructural para muro TEM, Tmáx
CONCRETO
2610004 - Primary Crusher
26100040002 - Steel Works
ESTRUCTURA ACER20.10.001.0003 - Montaje / Ejecución - Acero Estructural Liviano (<= 30 kg/m)
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0103 - Montaje / Ejecución - Acero Estructural Mediano (> 30 kg/m y <=
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0203 - Montaje / Ejecución - Acero Estructural Pesado (> 60 kg/m y <=
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0303 - Montaje / Ejecución - Acero Estructural Extra Pesado (> 90 kg/m
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0403 - Montaje / Ejecución - Acero Estructural Doble Extra Pesado (> 15
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0503 - Montaje / Ejecución - Acero Estructural Triple Extra Pesado (> 30
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.005.0003 - Montaje / Ejecución - Rejilla de Piso - Acero Carbono 32mm x 5m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.006.0003 - Montaje / Ejecución - Baranda de acero con Guardapies
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.008.0003 - Montaje / Ejecución - Escalera Ensamblada, incluye largueros, de
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0003 - Montaje / Ejecución - Estructura Ensamblada Liviana (<= 30 kg/m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0103 - Montaje / Ejecución - Estructura Ensamblada Mediana (> 30 kg/
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0203 - Montaje / Ejecución - Estructura Ensamblada Pesada (> 60 kg/m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
RIEL PUENTE GRUA20.10.015.0003 - Montaje / Ejecución - Riel Puente Grúa 85 lb/yard con colocació
RIEL PUENTE GRUA
RIEL PUENTE GRUA
26100040004 - Mechanical Works
NIVEL 5 - TANQUE 40.70.001.3001 - Montaje / Ejecución - TANQUE DE AIRE CHANCADO PRIMARIO ;
NIVEL 5 - TANQUE DE AIRE CHANCADO PRIMARIO 1
NIVEL 5 - TANQUE DE AIRE CHANCADO PRIMARIO 1
NIVEL 5 - TANQUE DE AIRE CHANCADO PRIMARIO 1
NIVEL 5 - TANQUE DE AIRE CHANCADO PRIMARIO 1
NIVEL 5 - TANQUE 40.70.001.3002 - Montaje / Ejecución - TANQUE DE AIRE CHANCADO PRIMARIO ;
NIVEL 5 - TANQUE DE AIRE CHANCADO PRIMARIO 2
NIVEL 5 - TANQUE DE AIRE CHANCADO PRIMARIO 2
NIVEL 5 - TANQUE DE AIRE CHANCADO PRIMARIO 2
NIVEL 5 - TANQUE DE AIRE CHANCADO PRIMARIO 2
NIVEL 5 - COMPRE 40.70.001.3003 - Montaje / Ejecución - COMPRESOR DE AIRE CHANCADO PRIMAR
NIVEL 5 - COMPRESOR DE AIRE CHANCADO PRIMARI
NIVEL 5 - COMPRESOR DE AIRE CHANCADO PRIMARI
NIVEL 5 - COMPRESOR DE AIRE CHANCADO PRIMARI
NIVEL 5 - COMPRESOR DE AIRE CHANCADO PRIMARI
NIVEL 5 - MOTOR 40.70.001.3004 - Montaje / Ejecución - MOTOR ELECTRICO COMPRESOR DE AIRE
NIVEL 5 - MOTOR ELECTRICO COMPRESOR DE AIRE
NIVEL 5 - MOTOR ELECTRICO COMPRESOR DE AIRE
NIVEL 5 - MOTOR ELECTRICO COMPRESOR DE AIRE
NIVEL 5 - MOTOR ELECTRICO COMPRESOR DE AIRE
NIVEL 5 - COMPRE 40.70.001.3005 - Montaje / Ejecución - COMPRESOR DE AIRE CHANCADO PRIMAR
NIVEL 5 - COMPRESOR DE AIRE CHANCADO PRIMARI
NIVEL 5 - COMPRESOR DE AIRE CHANCADO PRIMARI
NIVEL 5 - COMPRESOR DE AIRE CHANCADO PRIMARI
NIVEL 5 - COMPRESOR DE AIRE CHANCADO PRIMARI
NIVEL 5 - MOTOR 40.70.001.3006 - Montaje / Ejecución - MOTOR ELECTRICO COMPRESOR DE AIRE
NIVEL 5 - MOTOR ELECTRICO COMPRESOR DE AIRE
NIVEL 5 - MOTOR ELECTRICO COMPRESOR DE AIRE
NIVEL 5 - MOTOR ELECTRICO COMPRESOR DE AIRE
NIVEL 5 - MOTOR ELECTRICO COMPRESOR DE AIRE
NIVEL 1 - SECADOR40.70.001.3007 - Montaje / Ejecución - SECADOR DE AIRE ; 220 NM3/H ; 0,5x0,9x1
NIVEL 1 - SECADOR DE AIRE
NIVEL 1 - SECADOR DE AIRE
NIVEL 1 - SECADOR DE AIRE
NIVEL 1 - SECADOR DE AIRE
NIVEL 1 - AIR SUPP 40.30.001.5002 - Montaje / Ejecución - PRIMARY CRUSHER BUILDING AIR SUPPLY
NIVEL 1 - AIR SUPPLY FAN
NIVEL 1 - AIR SUPPLY FAN
NIVEL 1 - AIR SUPPLY FAN
NIVEL 1 - AIR SUPPLY FAN
NIVEL 1 - AIR SUPPLY FAN
NIVEL 1 - AIR SUP 40.30.001.5003 - Montaje / Ejecución - PRIMARY CRUSHER BUILDING AIR SUPPLY
NIVEL 1 - AIR SUPPLY FAN ELECTRIC MOTOR
NIVEL 1 - AIR SUPPLY FAN ELECTRIC MOTOR
NIVEL 1 - AIR SUPPLY FAN ELECTRIC MOTOR
NIVEL 1 - AIR SUPPLY FAN ELECTRIC MOTOR
NIVEL 1 - AIR SUPPLY FAN ELECTRIC MOTOR
NIVEL 1 - MAKE UP 40.30.001.5004 - Montaje / Ejecución - PRIMARY CRUSHER BUILDING MAKE UP A
NIVEL 1 - MAKE UP AIR FILTER
NIVEL 1 - MAKE UP AIR FILTER
NIVEL 1 - MAKE UP AIR FILTER
NIVEL 1 - MAKE UP AIR FILTER
NIVEL 1 - MAKE UP AIR FILTER
NIVEL 1 - VENTIL 40.30.001.5034 - Montaje / Ejecución - PRIMARY CRUSHER BUILDING VENTILATIO
NIVEL 1 - VENTILATION SYSTEM DUCTWORK
NIVEL 1 - VENTILATION SYSTEM DUCTWORK
NIVEL 1 - VENTILATION SYSTEM DUCTWORK
NIVEL 1 - VENTILATION SYSTEM DUCTWORK
NIVEL 1 - VENTILATION SYSTEM DUCTWORK
NIVEL 1 - VENTILA 40.30.001.5035 - Suministro, Fabricación,Montaje / Ejecución - PRIMARY CRUSHE
NIVEL 1 - VENTILATION SYSTEM SUPPLY GRILLES W
NIVEL 1 - VENTILATION SYSTEM SUPPLY GRILLES W
NIVEL 1 - VENTILATION SYSTEM SUPPLY GRILLES W
NIVEL 1 - VENTILATION SYSTEM SUPPLY GRILLES W
NIVEL 1 - VENTILATION SYSTEM SUPPLY GRILLES W
NIVEL 1 - VENTILA 40.30.001.5036 - Suministro, Fabricación,Montaje / Ejecución - PRIMARY CRUSHE
NIVEL 1 - VENTILATION SYSTEM SUPPLY GRILLES W
NIVEL 1 - VENTILATION SYSTEM SUPPLY GRILLES W
NIVEL 1 - VENTILATION SYSTEM SUPPLY GRILLES W
NIVEL 1 - VENTILATION SYSTEM SUPPLY GRILLES W
NIVEL 1 - VENTILATION SYSTEM SUPPLY GRILLES W
NIVEL 1 - MAKE UP40.30.001.5037 - Montaje / Ejecución - PRIMARY CRUSHER BUILDING MAKE UP A
NIVEL 1 - MAKE UP AIR FILTER ROTARY VALVE
NIVEL 1 - MAKE UP AIR FILTER ROTARY VALVE
NIVEL 1 - MAKE UP AIR FILTER ROTARY VALVE
NIVEL 1 - MAKE UP AIR FILTER ROTARY VALVE
NIVEL 1 - MAKE UP AIR FILTER ROTARY VALVE
NIVEL 1 - MAKE UP40.30.001.5038 - Montaje / Ejecución - PRIMARY CRUSHER BUILDING MAKE UP A
NIVEL 1 - MAKE UP AIR FILTER ROTARY VALVE EL
NIVEL 1 - MAKE UP AIR FILTER ROTARY VALVE EL
NIVEL 1 - MAKE UP AIR FILTER ROTARY VALVE EL
NIVEL 1 - MAKE UP AIR FILTER ROTARY VALVE EL
NIVEL 1 - MAKE UP AIR FILTER ROTARY VALVE EL
NIVEL 1 - MAKE UP40.30.001.5039 - Montaje / Ejecución - PRIMARY CRUSHER BUILDING MAKE UP A
NIVEL 1 - MAKE UP AIR FILTER DISCHARGE CHUTE
NIVEL 1 - MAKE UP AIR FILTER DISCHARGE CHUTE
NIVEL 1 - MAKE UP AIR FILTER DISCHARGE CHUTE
NIVEL 1 - MAKE UP AIR FILTER DISCHARGE CHUTE
NIVEL 1 - MAKE UP AIR FILTER DISCHARGE CHUTE
NIVEL 1 - MAKE UP40.30.001.5040 - Montaje / Ejecución - PRIMARY CRUSHER BUILDING MAKE UP A
NIVEL 1 - MAKE UP AIR FILTER DUST COLLECTION B
NIVEL 1 - MAKE UP AIR FILTER DUST COLLECTION B
NIVEL 1 - MAKE UP AIR FILTER DUST COLLECTION B
NIVEL 1 - MAKE UP AIR FILTER DUST COLLECTION B
NIVEL 1 - MAKE UP AIR FILTER DUST COLLECTION B
NIVEL 3 - PORTON 40.70.001.2601 - Montaje / Ejecución - PORTON MANTENCION EXCENTRICA 1 ; 7,
NIVEL 3 - PORTON MANTENCION EXCENTRICA 1
NIVEL 3 - PORTON MANTENCION EXCENTRICA 1
NIVEL 3 - PORTON MANTENCION EXCENTRICA 1
NIVEL 3 - PORTON MANTENCION EXCENTRICA 1
NIVEL 3 - PORTON 40.70.001.2604 - Montaje / Ejecución - PORTON MANTENCION EXCENTRICA 2 ; 7,
NIVEL 3 - PORTON MANTENCION EXCENTRICA 2
NIVEL 3 - PORTON MANTENCION EXCENTRICA 2
NIVEL 3 - PORTON MANTENCION EXCENTRICA 2
NIVEL 3 - PORTON MANTENCION EXCENTRICA 2
NIVEL 5 - REVEST 40.70.001.2607 - Montaje / Ejecución - REVESTIMIENTO TOLVA RECEPCION CHAN
NIVEL 5 - REVESTIMIENTO TOLVA RECEPCION CHA
NIVEL 5 - REVESTIMIENTO TOLVA RECEPCION CHA
NIVEL 5 - REVESTIMIENTO TOLVA RECEPCION CHA
NIVEL 5 - REVESTIMIENTO TOLVA RECEPCION CHA
NIVEL 3 - REVEST 40.70.001.2608 - Montaje / Ejecución - REVESTIMIENTO TOLVA DESCARGA CHAN
NIVEL 3 - REVESTIMIENTO TOLVA DESCARGA CHAN
NIVEL 3 - REVESTIMIENTO TOLVA DESCARGA CHAN
NIVEL 3 - REVESTIMIENTO TOLVA DESCARGA CHAN
NIVEL 3 - REVESTIMIENTO TOLVA DESCARGA CHAN
NIVEL 5 - REVEST 40.70.001.2609 - Montaje / Ejecución - REVESTIMIENTO TOLVA RECEPCION CHAN
NIVEL 5 - REVESTIMIENTO TOLVA RECEPCION CHA
NIVEL 5 - REVESTIMIENTO TOLVA RECEPCION CHA
NIVEL 5 - REVESTIMIENTO TOLVA RECEPCION CHA
NIVEL 5 - REVESTIMIENTO TOLVA RECEPCION CHA
NIVEL 3 - REVEST 40.70.001.2610 - Montaje / Ejecución - REVESTIMIENTO TOLVA DESCARGA CHAN
NIVEL 3 - REVESTIMIENTO TOLVA DESCARGA CHAN
NIVEL 3 - REVESTIMIENTO TOLVA DESCARGA CHAN
NIVEL 3 - REVESTIMIENTO TOLVA DESCARGA CHAN
NIVEL 3 - REVESTIMIENTO TOLVA DESCARGA CHAN
NIVEL 6 - ESTRUC 40.70.001.2611 - Montaje / Ejecución - ESTRUCTURA SOPORTE EJE PRINCIPAL CHA
NIVEL 6 - ESTRUCTURA SOPORTE EJE PRINCIPAL C
NIVEL 6 - ESTRUCTURA SOPORTE EJE PRINCIPAL C
NIVEL 6 - ESTRUCTURA SOPORTE EJE PRINCIPAL C
NIVEL 6 - ESTRUCTURA SOPORTE EJE PRINCIPAL C
NIVEL 5 - SELLO S 40.70.001.2612 - Montaje / Ejecución - SELLO SUPERIOR CHANCADO PRIMARIO 1
NIVEL 5 - SELLO SUPERIOR CHANCADO PRIMARIO 1
NIVEL 5 - SELLO SUPERIOR CHANCADO PRIMARIO 1
NIVEL 5 - SELLO SUPERIOR CHANCADO PRIMARIO 1
NIVEL 5 - SELLO SUPERIOR CHANCADO PRIMARIO 1
NIVEL 3 - REVEST 40.70.001.2614 - Montaje / Ejecución - REVESTIMIENTO BOCA DESCARGA CHANC
NIVEL 3 - REVESTIMIENTO BOCA DESCARGA CHANC
NIVEL 3 - REVESTIMIENTO BOCA DESCARGA CHANC
NIVEL 3 - REVESTIMIENTO BOCA DESCARGA CHANC
NIVEL 3 - REVESTIMIENTO BOCA DESCARGA CHANC
NIVEL 5 - SELLO S 40.70.001.2616 - Montaje / Ejecución - SELLO SUPERIOR CHANCADO PRIMARIO 2
NIVEL 5 - SELLO SUPERIOR CHANCADO PRIMARIO 2
NIVEL 5 - SELLO SUPERIOR CHANCADO PRIMARIO 2
NIVEL 5 - SELLO SUPERIOR CHANCADO PRIMARIO 2
NIVEL 5 - SELLO SUPERIOR CHANCADO PRIMARIO 2
NIVEL 3 - REVEST 40.70.001.2618 - Montaje / Ejecución - REVESTIMIENTO BOCA DESCARGA CHANC
NIVEL 3 - REVESTIMIENTO BOCA DESCARGA CHANC
NIVEL 3 - REVESTIMIENTO BOCA DESCARGA CHANC
NIVEL 3 - REVESTIMIENTO BOCA DESCARGA CHANC
NIVEL 3 - REVESTIMIENTO BOCA DESCARGA CHANC
NIVEL 2 - CAJON 40.70.001.2620 - Montaje / Ejecución - CAJON COLECTOR 1 CHATARRA MAGNETO
NIVEL 2 - CAJON COLECTOR 1 CHATARRA MAGNET
NIVEL 2 - CAJON COLECTOR 1 CHATARRA MAGNET
NIVEL 2 - CAJON COLECTOR 1 CHATARRA MAGNET
NIVEL 2 - CAJON COLECTOR 1 CHATARRA MAGNET
NIVEL 2 - CAJON 40.70.001.2621 - Montaje / Ejecución - CAJON COLECTOR 2 CHATARRA MAGNETO
NIVEL 2 - CAJON COLECTOR 2 CHATARRA MAGNET
NIVEL 2 - CAJON COLECTOR 2 CHATARRA MAGNET
NIVEL 2 - CAJON COLECTOR 2 CHATARRA MAGNET
NIVEL 2 - CAJON COLECTOR 2 CHATARRA MAGNET
NIVEL 2 - CAJON 40.70.001.2622 - Montaje / Ejecución - CAJON COLECTOR 3 CHATARRA MAGNETO
NIVEL 2 - CAJON COLECTOR 3 CHATARRA MAGNETO
NIVEL 2 - CAJON COLECTOR 3 CHATARRA MAGNETO
NIVEL 2 - CAJON COLECTOR 3 CHATARRA MAGNETO
NIVEL 2 - CAJON COLECTOR 3 CHATARRA MAGNETO
NIVEL 1 - CHUTE D 40.70.001.2625 - Montaje / Ejecución - CHUTE DE DESCARGA DE FINOS ALIMENTA
NIVEL 1 - CHUTE DE DESCARGA DE FINOS ALIMENTA
NIVEL 1 - CHUTE DE DESCARGA DE FINOS ALIMENTA
NIVEL 1 - CHUTE DE DESCARGA DE FINOS ALIMENTA
NIVEL 1 - CHUTE DE DESCARGA DE FINOS ALIMENTA
NIVEL 1 - CHUTE A 40.70.001.2628 - Montaje / Ejecución - CHUTE ALIMENTACION FAJA SACRIFICIO ;
NIVEL 1 - CHUTE ALIMENTACION FAJA SACRIFICIO 1
NIVEL 1 - CHUTE ALIMENTACION FAJA SACRIFICIO 1
NIVEL 1 - CHUTE ALIMENTACION FAJA SACRIFICIO 1
NIVEL 1 - CHUTE ALIMENTACION FAJA SACRIFICIO 1
NIVEL 1 - CHUTE A 40.70.001.2629 - Montaje / Ejecución - CHUTE ALIMENTACION FAJA SACRIFICIO ;
NIVEL 1 - CHUTE ALIMENTACION FAJA SACRIFICIO 2
NIVEL 1 - CHUTE ALIMENTACION FAJA SACRIFICIO 2
NIVEL 1 - CHUTE ALIMENTACION FAJA SACRIFICIO 2
NIVEL 1 - CHUTE ALIMENTACION FAJA SACRIFICIO 2
NIVEL 2 - CHUTE 40.70.001.2632 - Montaje / Ejecución - CHUTE ALIMENTACION FAJA ALIMENTADO
NIVEL 2 - CHUTE ALIMENTACION FAJA ALIMENTAD
NIVEL 2 - CHUTE ALIMENTACION FAJA ALIMENTAD
NIVEL 2 - CHUTE ALIMENTACION FAJA ALIMENTAD
NIVEL 2 - CHUTE ALIMENTACION FAJA ALIMENTAD
NIVEL 2 - CHUTE 40.70.001.2633 - Montaje / Ejecución - CHUTE DESCARGA FAJA ALIMENTADORA 1
NIVEL 2 - CHUTE DESCARGA FAJA ALIMENTADORA
NIVEL 2 - CHUTE DESCARGA FAJA ALIMENTADORA
NIVEL 2 - CHUTE DESCARGA FAJA ALIMENTADORA
NIVEL 2 - CHUTE DESCARGA FAJA ALIMENTADORA
NIVEL 2 - CHUTE 40.70.001.2634 - Montaje / Ejecución - CHUTE ALIMENTACION FAJA ALIMENTADO
NIVEL 2 - CHUTE ALIMENTACION FAJA ALIMENTAD
NIVEL 2 - CHUTE ALIMENTACION FAJA ALIMENTAD
NIVEL 2 - CHUTE ALIMENTACION FAJA ALIMENTAD
NIVEL 2 - CHUTE ALIMENTACION FAJA ALIMENTAD
NIVEL 2 - CHUTE 40.70.001.2635 - Montaje / Ejecución - CHUTE DESCARGA FAJA ALIMENTADORA 2
NIVEL 2 - CHUTE DESCARGA FAJA ALIMENTADORA
NIVEL 2 - CHUTE DESCARGA FAJA ALIMENTADORA
NIVEL 2 - CHUTE DESCARGA FAJA ALIMENTADORA
NIVEL 2 - CHUTE DESCARGA FAJA ALIMENTADORA
NIVEL 6 - PRIMAR 40.70.001.3806 - Montaje / Ejecución - SISTEMA SUPRESOR DE POLVO DESCARGA
NIVEL 6 - PRIMARY CRUSHER 1 DUMP POCKET DUST
NIVEL 6 - PRIMARY CRUSHER 1 DUMP POCKET DUST
NIVEL 6 - PRIMARY CRUSHER 1 DUMP POCKET DUST
NIVEL 6 - PRIMARY 40.70.001.3807
CRUSHER 1 DUMP POCKET/DUST
- Montaje Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESO
NIVEL 6 - PRIMAR DISTRIBUTION BOX, 0.72 Kw,
NIVEL 6 - PRIMARY CRUSHER 1 DUMP POCKET DUST
NIVEL 6 - PRIMARY CRUSHER 1 DUMP POCKET DUST
NIVEL 6 - PRIMARY CRUSHER 1 DUMP POCKET DUST
NIVEL 6 - PRIMARY CRUSHER 1 DUMP POCKET DUST
NIVEL 6 - PRIMAR 40.70.001.3808 - Montaje / Ejecución - DIFUSOR SISTEMA SUPRESOR DE POLVO 1
NIVEL 6 - PRIMARY CRUSHER 1 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 1 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 1 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 1 TRUCK UNLOADING
NIVEL 6 - PRIMAR 40.70.001.3809 - Montaje / Ejecución - DIFUSOR SISTEMA SUPRESOR DE POLVO 2
NIVEL 6 - PRIMARY CRUSHER 1 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 1 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 1 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 1 TRUCK UNLOADING
NIVEL 6 - PRIMAR 40.70.001.3810 - Montaje / Ejecución - DIFUSOR SISTEMA SUPRESOR DE POLVO 3
NIVEL 6 - PRIMARY CRUSHER 1 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 1 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 1 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 1 TRUCK UNLOADING
NIVEL 6 - PRIMAR 40.70.001.3811 - Montaje / Ejecución - DIFUSOR SISTEMA SUPRESOR DE POLVO 4
NIVEL 6 - PRIMARY CRUSHER 1 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 1 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 1 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 1 TRUCK UNLOADING
NIVEL 6 - PRIMAR 40.70.001.3813 - Montaje / Ejecución - SISTEMA SUPRESOR DE POLVO DESCARGA
NIVEL 6 - PRIMARY CRUSHER 2 DUMP POCKET DUST
NIVEL 6 - PRIMARY CRUSHER 2 DUMP POCKET DUST
NIVEL 6 - PRIMARY CRUSHER 2 DUMP POCKET DUST
NIVEL 6 - PRIMARY 40.70.001.3814
CRUSHER 2 DUMP POCKET/DUST
- Montaje Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESO
NIVEL 6 - PRIMAR DISTRIBUTION BOX, 0.72 Kw,
NIVEL 6 - PRIMARY CRUSHER 2 DUMP POCKET DUST
NIVEL 6 - PRIMARY CRUSHER 2 DUMP POCKET DUST
NIVEL 6 - PRIMARY CRUSHER 2 DUMP POCKET DUST
NIVEL 6 - PRIMARY CRUSHER 2 DUMP POCKET DUST
NIVEL 6 - PRIMAR 40.70.001.3815 - Montaje / Ejecución - DIFUSOR SISTEMA SUPRESOR DE POLVO 1
NIVEL 6 - PRIMARY CRUSHER 2 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 2 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 2 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 2 TRUCK UNLOADING
NIVEL 6 - PRIMAR 40.70.001.3816 - Montaje / Ejecución - DIFUSOR SISTEMA SUPRESOR DE POLVO 2
NIVEL 6 - PRIMARY CRUSHER 2 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 2 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 2 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 2 TRUCK UNLOADING
NIVEL 6 - PRIMAR 40.70.001.3817 - Montaje / Ejecución - DIFUSOR SISTEMA SUPRESOR DE POLVO 3
NIVEL 6 - PRIMARY CRUSHER 2 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 2 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 2 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 2 TRUCK UNLOADING
NIVEL 6 - PRIMAR 40.70.001.3818 - Montaje / Ejecución - DIFUSOR SISTEMA SUPRESOR DE POLVO 4
NIVEL 6 - PRIMARY CRUSHER 2 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 2 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 2 TRUCK UNLOADING
NIVEL 6 - PRIMARY CRUSHER 2 TRUCK UNLOADING
NIVEL 4 - BOTTOM 40.80.001.0101 - Montaje / Ejecución - CHANCADORA PRIMARIA 1 ; 5312 TPH
NIVEL 4 - BOTTOM SHELL 1
NIVEL 4 - BOTTOM SHELL 1
NIVEL 4 - BOTTOM SHELL 1
NIVEL 4 - BOTTOM SHELL 1
NIVEL 4 - BOTTOM SHELL 1
NIVEL 4 - EXCENTRI40.80.001.0101 - Montaje / Ejecución - CHANCADORA PRIMARIA 1 ; 5312 TPH
NIVEL 4 - EXCENTRICA 1
NIVEL 4 - EXCENTRICA 1
NIVEL 4 - EXCENTRICA 1
NIVEL 4 - EXCENTRICA 1
NIVEL 4 - EXCENTRICA 1
NIVEL 4 - COUNTER40.80.001.0101 - Montaje / Ejecución - CHANCADORA PRIMARIA 1 ; 5312 TPH
NIVEL 4 - COUNTERSHAFT 1
NIVEL 4 - COUNTERSHAFT 1
NIVEL 4 - COUNTERSHAFT 1
NIVEL 4 - COUNTERSHAFT 1
NIVEL 4 - COUNTERSHAFT 1
NIVEL 4 - DUST BO 40.80.001.0101 - Montaje / Ejecución - CHANCADORA PRIMARIA 1 ; 5312 TPH
NIVEL 4 - DUST BONNET 1
NIVEL 4 - DUST BONNET 1
NIVEL 4 - DUST BONNET 1
NIVEL 4 - DUST BONNET 1
NIVEL 4 - DUST BONNET 1
NIVEL 4 - MIDDLE S40.80.001.0101 - Montaje / Ejecución - CHANCADORA PRIMARIA 1 ; 5312 TPH
NIVEL 4 - MIDDLE SHELL 1
NIVEL 4 - MIDDLE SHELL 1
NIVEL 4 - MIDDLE SHELL 1
NIVEL 4 - MIDDLE SHELL 1
NIVEL 4 - MIDDLE SHELL 1
NIVEL 4 - TOP SHEL40.80.001.0101 - Montaje / Ejecución - CHANCADORA PRIMARIA 1 ; 5312 TPH
NIVEL 4 - TOP SHELL 1
NIVEL 4 - TOP SHELL 1
NIVEL 4 - TOP SHELL 1
NIVEL 4 - TOP SHELL 1
NIVEL 4 - TOP SHELL 1
NIVEL 5 - MAIN SHA40.80.001.0101 - Montaje / Ejecución - CHANCADORA PRIMARIA 1 ; 5312 TPH
NIVEL 5 - MAIN SHAFT 1
NIVEL 5 - MAIN SHAFT 1
NIVEL 5 - MAIN SHAFT 1
NIVEL 5 - MAIN SHAFT 1
NIVEL 5 - MAIN SHAFT 1
NIVEL 5 - SPIDER 1 40.80.001.0101 - Montaje / Ejecución - CHANCADORA PRIMARIA 1 ; 5312 TPH
NIVEL 5 - SPIDER 1
NIVEL 5 - SPIDER 1
NIVEL 5 - SPIDER 1
NIVEL 5 - SPIDER 1
NIVEL 5 - SPIDER 1
NIVEL 3 - UNIDAD 40.80.001.0102 - Montaje / Ejecución - UNIDAD DE LUBRICACION E HIDRAULICA C
NIVEL 3 - UNIDAD DE LUBRICACION E HIDRAULICA
NIVEL 3 - UNIDAD DE LUBRICACION E HIDRAULICA
NIVEL 3 - UNIDAD DE LUBRICACION E HIDRAULICA
NIVEL 3 - UNIDAD DE LUBRICACION E HIDRAULICA
NIVEL 3 - UNIDAD DE LUBRICACION E HIDRAULICA
NIVEL 3 - MOTOR 40.80.001.0103 - Montaje / Ejecución - MOTOR ELECTRICO BOMBA DE LUBRICACI
NIVEL 3 - MOTOR ELECTRICO BOMBA DE LUBRICAC
NIVEL 3 - MOTOR ELECTRICO BOMBA DE LUBRICAC
NIVEL 3 - MOTOR ELECTRICO BOMBA DE LUBRICAC
NIVEL 3 - MOTOR ELECTRICO BOMBA DE LUBRICAC
NIVEL 3 - MOTOR ELECTRICO BOMBA DE LUBRICAC
NIVEL 3 - MOTOR 40.80.001.0104 - Montaje / Ejecución - MOTOR ELECTRICO BOMBA STAND BY DE
NIVEL 3 - MOTOR ELECTRICO BOMBA STAND BY DE
NIVEL 3 - MOTOR ELECTRICO BOMBA STAND BY DE
NIVEL 3 - MOTOR ELECTRICO BOMBA STAND BY DE
NIVEL 3 - MOTOR ELECTRICO BOMBA STAND BY DE
NIVEL 3 - MOTOR ELECTRICO BOMBA STAND BY DE
NIVEL 5 - MOTOR 40.80.001.0105 - Montaje / Ejecución - MOTOR ELECTRICO BOMBA HIDRAULICA C
NIVEL 5 - MOTOR ELECTRICO BOMBA HIDRAULICA
NIVEL 5 - MOTOR ELECTRICO BOMBA HIDRAULICA
NIVEL 5 - MOTOR ELECTRICO BOMBA HIDRAULICA
NIVEL 5 - MOTOR ELECTRICO BOMBA HIDRAULICA
NIVEL 5 - MOTOR ELECTRICO BOMBA HIDRAULICA
NIVEL 5 - MOTOR 40.80.001.0106 - Montaje / Ejecución - MOTOR ELECTRICO BOMBA STAND BY HID
NIVEL 5 - MOTOR ELECTRICO BOMBA STAND BY HI
NIVEL 5 - MOTOR ELECTRICO BOMBA STAND BY HI
NIVEL 5 - MOTOR ELECTRICO BOMBA STAND BY HI
NIVEL 5 - MOTOR ELECTRICO BOMBA STAND BY HI
NIVEL 5 - MOTOR ELECTRICO BOMBA STAND BY HI
NIVEL 4 - MOTOR 40.80.001.0107 - Montaje / Ejecución - MOTOR ELECTRICO BOMBA LIMPIEZA ACE
NIVEL 4 - MOTOR ELECTRICO BOMBA LIMPIEZA AC
NIVEL 4 - MOTOR ELECTRICO BOMBA LIMPIEZA AC
NIVEL 4 - MOTOR ELECTRICO BOMBA LIMPIEZA AC
NIVEL 4 - MOTOR ELECTRICO BOMBA LIMPIEZA AC
NIVEL 4 - MOTOR ELECTRICO BOMBA LIMPIEZA AC
NIVEL 3 - SISTEM 40.80.001.0108 - Montaje / Ejecución - SISTEMA LUBRICACION ARAÑA CHANCAD
NIVEL 3 - SISTEMA LUBRICACION ARAÑA CHANCAD
NIVEL 3 - SISTEMA LUBRICACION ARAÑA CHANCAD
NIVEL 3 - SISTEMA LUBRICACION ARAÑA CHANCAD
NIVEL 3 - SISTEMA LUBRICACION ARAÑA CHANCAD
NIVEL 3 - SISTEMA LUBRICACION ARAÑA CHANCAD
NIVEL 3 - MOTOR 40.80.001.0109 - Montaje / Ejecución - MOTOR ELECTRICO SISTEMA LUBRICACION
NIVEL 3 - MOTOR ELECTRICO SISTEMA LUBRICACI
NIVEL 3 - MOTOR ELECTRICO SISTEMA LUBRICACI
NIVEL 3 - MOTOR ELECTRICO SISTEMA LUBRICACI
NIVEL 3 - MOTOR ELECTRICO SISTEMA LUBRICACI
NIVEL 3 - MOTOR ELECTRICO SISTEMA LUBRICACI
NIVEL 4 - MOTOR 40.80.001.0110 - Montaje / Ejecución - MOTOR ELECTRICO CHANCADORA PRIMA
NIVEL 4 - MOTOR ELECTRICO CHANCADORA PRIMAR
NIVEL 4 - MOTOR ELECTRICO CHANCADORA PRIMAR
NIVEL 4 - MOTOR ELECTRICO CHANCADORA PRIMAR
NIVEL 4 - MOTOR ELECTRICO CHANCADORA PRIMAR
NIVEL 4 - MOTOR ELECTRICO CHANCADORA PRIMAR
NIVEL 4 - SISTEM 40.80.001.0111 - Montaje / Ejecución - SISTEMA SELLO POLVO CHANCADORA PRI
NIVEL 4 - SISTEMA SELLO POLVO CHANCADORA PRI
NIVEL 4 - SISTEMA SELLO POLVO CHANCADORA PRI
NIVEL 4 - SISTEMA SELLO POLVO CHANCADORA PRI
NIVEL 4 - SISTEMA SELLO POLVO CHANCADORA PRI
NIVEL 4 - SISTEMA SELLO POLVO CHANCADORA PRI
NIVEL 4 - MOTOR 40.80.001.0112 - Montaje / Ejecución - MOTOR ELECTRICO SISTEMA SELLO POLVO
NIVEL 4 - MOTOR ELECTRICO SISTEMA SELLO POL
NIVEL 4 - MOTOR ELECTRICO SISTEMA SELLO POL
NIVEL 4 - MOTOR ELECTRICO SISTEMA SELLO POL
NIVEL 4 - MOTOR ELECTRICO SISTEMA SELLO POL
NIVEL 4 - MOTOR ELECTRICO SISTEMA SELLO POL
NIVEL 4 - SISTEM 40.80.001.0113 - Montaje / Ejecución - SISTEMA DE ENFRIAMIENTO DE ACEITE CH
NIVEL 4 - SISTEMA DE ENFRIAMIENTO DE ACEITE
NIVEL 4 - SISTEMA DE ENFRIAMIENTO DE ACEITE
NIVEL 4 - SISTEMA DE ENFRIAMIENTO DE ACEITE
NIVEL 4 - SISTEMA DE ENFRIAMIENTO DE ACEITE
NIVEL 4 - SISTEMA DE ENFRIAMIENTO DE ACEITE
NIVEL 4 - MOTOR 40.80.001.0114 - Montaje / Ejecución - MOTOR ELECTRICO VENTILADOR 1 SISTEM
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 1 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 1 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 1 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 1 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 1 SISTE
NIVEL 4 - MOTOR 40.80.001.0115 - Montaje / Ejecución - MOTOR ELECTRICO VENTILADOR 2 SISTEM
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 2 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 2 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 2 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 2 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 2 SISTE
NIVEL 6 - REPUEST 40.80.001.0116 - Montaje / Ejecución - REPUESTO DE EJE PRINCIPAL CHANCADOR
NIVEL 6 - REPUESTO DE EJE PRINCIPAL CHANCADOR
NIVEL 6 - REPUESTO DE EJE PRINCIPAL CHANCADOR
NIVEL 6 - REPUESTO DE EJE PRINCIPAL CHANCADOR
NIVEL 6 - REPUESTO DE EJE PRINCIPAL CHANCADOR
NIVEL 6 - REPUESTO DE EJE PRINCIPAL CHANCADOR
NIVEL 6 - SISTEM 40.80.001.0117 - Montaje / Ejecución - SISTEMA DE POSICIONAMIENTO VERTICAL
NIVEL 6 - SISTEMA DE POSICIONAMIENTO VERTICA
NIVEL 6 - SISTEMA DE POSICIONAMIENTO VERTICA
NIVEL 6 - SISTEMA DE POSICIONAMIENTO VERTICA
NIVEL 6 - SISTEMA DE POSICIONAMIENTO VERTICA
NIVEL 6 - SISTEMA DE POSICIONAMIENTO VERTICA
NIVEL 4 - BOTTOM 40.80.001.0118 - Montaje / Ejecución - CHANCADORA PRIMARIA 2 ; 5312 TPH
NIVEL 4 - BOTTOM SHELL 2
NIVEL 4 - BOTTOM SHELL 2
NIVEL 4 - BOTTOM SHELL 2
NIVEL 4 - BOTTOM SHELL 2
NIVEL 4 - BOTTOM SHELL 2
NIVEL 4 - EXCENTRI40.80.001.0118 - Montaje / Ejecución - CHANCADORA PRIMARIA 2 ; 5312 TPH
NIVEL 4 - EXCENTRICA 2
NIVEL 4 - EXCENTRICA 2
NIVEL 4 - EXCENTRICA 2
NIVEL 4 - EXCENTRICA 2
NIVEL 4 - EXCENTRICA 2
NIVEL 4 - COUNTER40.80.001.0118 - Montaje / Ejecución - CHANCADORA PRIMARIA 2 ; 5312 TPH
NIVEL 4 - COUNTERSHAFT 2
NIVEL 4 - COUNTERSHAFT 2
NIVEL 4 - COUNTERSHAFT 2
NIVEL 4 - COUNTERSHAFT 2
NIVEL 4 - COUNTERSHAFT 2
NIVEL 4 - DUST BO 40.80.001.0118 - Montaje / Ejecución - CHANCADORA PRIMARIA 2 ; 5312 TPH
NIVEL 4 - DUST BONNET 2
NIVEL 4 - DUST BONNET 2
NIVEL 4 - DUST BONNET 2
NIVEL 4 - DUST BONNET 2
NIVEL 4 - DUST BONNET 2
NIVEL 4 - MIDDLE S40.80.001.0118 - Montaje / Ejecución - CHANCADORA PRIMARIA 2 ; 5312 TPH
NIVEL 4 - MIDDLE SHELL 2
NIVEL 4 - MIDDLE SHELL 2
NIVEL 4 - MIDDLE SHELL 2
NIVEL 4 - MIDDLE SHELL 2
NIVEL 4 - MIDDLE SHELL 2
NIVEL 4 - TOP SHEL40.80.001.0118 - Montaje / Ejecución - CHANCADORA PRIMARIA 2 ; 5312 TPH
NIVEL 4 - TOP SHELL 2
NIVEL 4 - TOP SHELL 2
NIVEL 4 - TOP SHELL 2
NIVEL 4 - TOP SHELL 2
NIVEL 4 - TOP SHELL 2
NIVEL 5 - MAIN SHA40.80.001.0118 - Montaje / Ejecución - CHANCADORA PRIMARIA 2 ; 5312 TPH
NIVEL 5 - MAIN SHAFT 2
NIVEL 5 - MAIN SHAFT 2
NIVEL 5 - MAIN SHAFT 2
NIVEL 5 - MAIN SHAFT 2
NIVEL 5 - MAIN SHAFT 2
NIVEL 5 - SPIDER 2 40.80.001.0118 - Montaje / Ejecución - CHANCADORA PRIMARIA 2 ; 5312 TPH
NIVEL 5 - SPIDER 2
NIVEL 5 - SPIDER 2
NIVEL 5 - SPIDER 2
NIVEL 5 - SPIDER 2
NIVEL 5 - SPIDER 2
NIVEL 3 - UNIDAD 40.80.001.0119 - Montaje / Ejecución - UNIDAD DE LUBRICACION E HIDRAULICA C
NIVEL 3 - UNIDAD DE LUBRICACION E HIDRAULICA
NIVEL 3 - UNIDAD DE LUBRICACION E HIDRAULICA
NIVEL 3 - UNIDAD DE LUBRICACION E HIDRAULICA
NIVEL 3 - UNIDAD DE LUBRICACION E HIDRAULICA
NIVEL 3 - UNIDAD DE LUBRICACION E HIDRAULICA
NIVEL 3 - MOTOR 40.80.001.0120 - Montaje / Ejecución - MOTOR ELECTRICO BOMBA DE LUBRICACI
NIVEL 3 - MOTOR ELECTRICO BOMBA DE LUBRICAC
NIVEL 3 - MOTOR ELECTRICO BOMBA DE LUBRICAC
NIVEL 3 - MOTOR ELECTRICO BOMBA DE LUBRICAC
NIVEL 3 - MOTOR ELECTRICO BOMBA DE LUBRICAC
NIVEL 3 - MOTOR ELECTRICO BOMBA DE LUBRICAC
NIVEL 3 - MOTOR 40.80.001.0121 - Montaje / Ejecución - MOTOR ELECTRICO BOMBA STAND BY DE
NIVEL 3 - MOTOR ELECTRICO BOMBA STAND BY DE
NIVEL 3 - MOTOR ELECTRICO BOMBA STAND BY DE
NIVEL 3 - MOTOR ELECTRICO BOMBA STAND BY DE
NIVEL 3 - MOTOR ELECTRICO BOMBA STAND BY DE
NIVEL 3 - MOTOR ELECTRICO BOMBA STAND BY DE
NIVEL 5 - MOTOR 40.80.001.0122 - Montaje / Ejecución - MOTOR ELECTRICO BOMBA HIDRAULICA C
NIVEL 5 - MOTOR ELECTRICO BOMBA HIDRAULICA
NIVEL 5 - MOTOR ELECTRICO BOMBA HIDRAULICA
NIVEL 5 - MOTOR ELECTRICO BOMBA HIDRAULICA
NIVEL 5 - MOTOR ELECTRICO BOMBA HIDRAULICA
NIVEL 5 - MOTOR ELECTRICO BOMBA HIDRAULICA
NIVEL 5 - MOTOR 40.80.001.0123 - Montaje / Ejecución - MOTOR ELECTRICO BOMBA STAND BY HID
NIVEL 5 - MOTOR ELECTRICO BOMBA STAND BY HI
NIVEL 5 - MOTOR ELECTRICO BOMBA STAND BY HI
NIVEL 5 - MOTOR ELECTRICO BOMBA STAND BY HI
NIVEL 5 - MOTOR ELECTRICO BOMBA STAND BY HI
NIVEL 5 - MOTOR ELECTRICO BOMBA STAND BY HI
NIVEL 4 - MOTOR 40.80.001.0124 - Montaje / Ejecución - MOTOR ELECTRICO BOMBA LIMPIEZA ACE
NIVEL 4 - MOTOR ELECTRICO BOMBA LIMPIEZA AC
NIVEL 4 - MOTOR ELECTRICO BOMBA LIMPIEZA AC
NIVEL 4 - MOTOR ELECTRICO BOMBA LIMPIEZA AC
NIVEL 4 - MOTOR ELECTRICO BOMBA LIMPIEZA AC
NIVEL 4 - MOTOR ELECTRICO BOMBA LIMPIEZA AC
NIVEL 3 - SISTEM 40.80.001.0125 - Montaje / Ejecución - SISTEMA LUBRICACION ARAÑA CHANCAD
NIVEL 3 - SISTEMA LUBRICACION ARAÑA CHANCAD
NIVEL 3 - SISTEMA LUBRICACION ARAÑA CHANCAD
NIVEL 3 - SISTEMA LUBRICACION ARAÑA CHANCAD
NIVEL 3 - SISTEMA LUBRICACION ARAÑA CHANCAD
NIVEL 3 - SISTEMA LUBRICACION ARAÑA CHANCAD
NIVEL 3 - MOTOR 40.80.001.0126 - Montaje / Ejecución - MOTOR ELECTRICO SISTEMA LUBRICACION
NIVEL 3 - MOTOR ELECTRICO SISTEMA LUBRICACI
NIVEL 3 - MOTOR ELECTRICO SISTEMA LUBRICACI
NIVEL 3 - MOTOR ELECTRICO SISTEMA LUBRICACI
NIVEL 3 - MOTOR ELECTRICO SISTEMA LUBRICACI
NIVEL 3 - MOTOR ELECTRICO SISTEMA LUBRICACI
NIVEL 4 - MOTOR 40.80.001.0127 - Montaje / Ejecución - MOTOR ELECTRICO CHANCADORA PRIMA
NIVEL 4 - MOTOR ELECTRICO CHANCADORA PRIMAR
NIVEL 4 - MOTOR ELECTRICO CHANCADORA PRIMAR
NIVEL 4 - MOTOR ELECTRICO CHANCADORA PRIMAR
NIVEL 4 - MOTOR ELECTRICO CHANCADORA PRIMAR
NIVEL 4 - MOTOR ELECTRICO CHANCADORA PRIMAR
NIVEL 4 - SISTEM 40.80.001.0128 - Montaje / Ejecución - SISTEMA SELLO POLVO CHANCADORA PRI
NIVEL 4 - SISTEMA SELLO POLVO CHANCADORA PRI
NIVEL 4 - SISTEMA SELLO POLVO CHANCADORA PRI
NIVEL 4 - SISTEMA SELLO POLVO CHANCADORA PRI
NIVEL 4 - SISTEMA SELLO POLVO CHANCADORA PRI
NIVEL 4 - SISTEMA SELLO POLVO CHANCADORA PRI
NIVEL 4 - MOTOR 40.80.001.0129 - Montaje / Ejecución - MOTOR ELECTRICO SISTEMA SELLO POLVO
NIVEL 4 - MOTOR ELECTRICO SISTEMA SELLO POL
NIVEL 4 - MOTOR ELECTRICO SISTEMA SELLO POL
NIVEL 4 - MOTOR ELECTRICO SISTEMA SELLO POL
NIVEL 4 - MOTOR ELECTRICO SISTEMA SELLO POL
NIVEL 4 - MOTOR ELECTRICO SISTEMA SELLO POL
NIVEL 4 - SISTEM 40.80.001.0130 - Montaje / Ejecución - SISTEMA DE ENFRIAMIENTO DE ACEITE CH
NIVEL 4 - SISTEMA DE ENFRIAMIENTO DE ACEITE
NIVEL 4 - SISTEMA DE ENFRIAMIENTO DE ACEITE
NIVEL 4 - SISTEMA DE ENFRIAMIENTO DE ACEITE
NIVEL 4 - SISTEMA DE ENFRIAMIENTO DE ACEITE
NIVEL 4 - SISTEMA DE ENFRIAMIENTO DE ACEITE
NIVEL 4 - MOTOR 40.80.001.0131 - Montaje / Ejecución - MOTOR ELECTRICO VENTILADOR 1 SISTEM
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 1 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 1 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 1 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 1 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 1 SISTE
NIVEL 4 - MOTOR 40.80.001.0132 - Montaje / Ejecución - MOTOR ELECTRICO VENTILADOR 2 SISTEM
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 2 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 2 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 2 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 2 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 2 SISTE
NIVEL 6 - SISTEM 40.80.001.0133 - Montaje / Ejecución - SISTEMA DE POSICIONAMIENTO VERTICAL
NIVEL 6 - SISTEMA DE POSICIONAMIENTO VERTIC
NIVEL 6 - SISTEMA DE POSICIONAMIENTO VERTIC
NIVEL 6 - SISTEMA DE POSICIONAMIENTO VERTIC
NIVEL 6 - SISTEMA DE POSICIONAMIENTO VERTIC
NIVEL 6 - SISTEMA DE POSICIONAMIENTO VERTIC
NIVEL 4 - MOTOR 40.80.001.0134 - Montaje / Ejecución - MOTOR ELECTRICO VENTILADOR 2 SISTEM
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 2 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 2 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 2 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 2 SISTE
NIVEL 4 - MOTOR ELECTRICO VENTILADOR 2 SISTE
NIVEL 6 - SISTEM 40.80.001.0135 - Montaje / Ejecución - SISTEMA DE POSICIONAMIENTO VERTICAL
NIVEL 6 - SISTEMA DE POSICIONAMIENTO VERTIC
NIVEL 6 - SISTEMA DE POSICIONAMIENTO VERTIC
NIVEL 6 - SISTEMA DE POSICIONAMIENTO VERTIC
NIVEL 6 - SISTEMA DE POSICIONAMIENTO VERTIC
NIVEL 6 - SISTEMA DE POSICIONAMIENTO VERTIC
NIVEL 2 - FAJA A 40.80.001.0501 - Montaje / Ejecución - FAJA ALIMENTADORA 1 CHANCADORA PR
NIVEL 2 - FAJA ALIMENTADORA 1 CHANCADORA PR
NIVEL 2 - FAJA ALIMENTADORA 1 CHANCADORA PR
NIVEL 2 - FAJA ALIMENTADORA 1 CHANCADORA PR
NIVEL 2 - FAJA ALIMENTADORA 1 CHANCADORA PR
NIVEL 2 - FAJA ALIMENTADORA 1 CHANCADORA PR
NIVEL 2 - FAJA ALIMENTADORA 1 CHANCADORA PR
NIVEL 1 - UNIDAD 40.80.001.0502 - Montaje / Ejecución - UNIDAD HIDRAULICA FAJA ALIMENTADOR
NIVEL 1 - UNIDAD HIDRAULICA FAJA ALIMENTADO
NIVEL 1 - UNIDAD HIDRAULICA FAJA ALIMENTADO
NIVEL 1 - UNIDAD HIDRAULICA FAJA ALIMENTADO
NIVEL 1 - UNIDAD HIDRAULICA FAJA ALIMENTADO
NIVEL 1 - UNIDAD HIDRAULICA FAJA ALIMENTADO
NIVEL 1 - UNIDAD HIDRAULICA FAJA ALIMENTADO
NIVEL 1 - MOTOR 40.80.001.0503 - Montaje / Ejecución - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR 40.80.001.0504 - Montaje / Ejecución - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR 40.80.001.0505 - Montaje / Ejecución - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - UNIDAD 40.80.001.0506 - Montaje / Ejecución - UNIDAD ENFRIAMIENTO ACEITE HIDRAUL
NIVEL 1 - UNIDAD ENFRIAMIENTO ACEITE HIDRAU
NIVEL 1 - UNIDAD ENFRIAMIENTO ACEITE HIDRAU
NIVEL 1 - UNIDAD ENFRIAMIENTO ACEITE HIDRAU
NIVEL 1 - UNIDAD ENFRIAMIENTO ACEITE HIDRAU
NIVEL 1 - UNIDAD ENFRIAMIENTO ACEITE HIDRAU
NIVEL 1 - UNIDAD ENFRIAMIENTO ACEITE HIDRAU
NIVEL 1 - MOTOR 40.80.001.0507 - Montaje / Ejecución - MOTOR ELECTRICO UNIDAD ENFRIAMIENT
NIVEL 1 - MOTOR ELECTRICO UNIDAD ENFRIAMIEN
NIVEL 1 - MOTOR ELECTRICO UNIDAD ENFRIAMIEN
NIVEL 1 - MOTOR ELECTRICO UNIDAD ENFRIAMIEN
NIVEL 1 - MOTOR ELECTRICO UNIDAD ENFRIAMIEN
NIVEL 1 - MOTOR ELECTRICO UNIDAD ENFRIAMIEN
NIVEL 1 - MOTOR ELECTRICO UNIDAD ENFRIAMIEN
NIVEL 1 - MOTOR 40.80.001.0508 - Montaje / Ejecución - MOTOR HIDRAULICO 1 FAJA ALIMENTADO
NIVEL 1 - MOTOR HIDRAULICO 1 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 1 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 1 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 1 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 1 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 1 FAJA ALIMENTAD
NIVEL 1 - MOTOR 40.80.001.0509 - Montaje / Ejecución - MOTOR HIDRAULICO 2 FAJA ALIMENTADO
NIVEL 1 - MOTOR HIDRAULICO 2 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 2 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 2 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 2 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 2 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 2 FAJA ALIMENTAD
NIVEL 2 - FAJA A 40.80.001.0510 - Montaje / Ejecución - FAJA ALIMENTADORA 2 CHANCADORA PR
NIVEL 2 - FAJA ALIMENTADORA 2 CHANCADORA PR
NIVEL 2 - FAJA ALIMENTADORA 2 CHANCADORA PR
NIVEL 2 - FAJA ALIMENTADORA 2 CHANCADORA PR
NIVEL 2 - FAJA ALIMENTADORA 2 CHANCADORA PR
NIVEL 2 - FAJA ALIMENTADORA 2 CHANCADORA PR
NIVEL 2 - FAJA ALIMENTADORA 2 CHANCADORA PR
NIVEL 1 - UNIDAD 40.80.001.0511 - Montaje / Ejecución - UNIDAD HIDRAULICA FAJA ALIMENTADOR
NIVEL 1 - UNIDAD HIDRAULICA FAJA ALIMENTADO
NIVEL 1 - UNIDAD HIDRAULICA FAJA ALIMENTADO
NIVEL 1 - UNIDAD HIDRAULICA FAJA ALIMENTADO
NIVEL 1 - UNIDAD HIDRAULICA FAJA ALIMENTADO
NIVEL 1 - UNIDAD HIDRAULICA FAJA ALIMENTADO
NIVEL 1 - UNIDAD HIDRAULICA FAJA ALIMENTADO
NIVEL 1 - MOTOR 40.80.001.0512 - Montaje / Ejecución - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR 40.80.001.0513 - Montaje / Ejecución - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR 40.80.001.0514 - Montaje / Ejecución - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 1 - UNIDAD 40.80.001.0515 - Montaje / Ejecución - UNIDAD ENFRIAMIENTO ACEITE HIDRAUL
NIVEL 1 - UNIDAD ENFRIAMIENTO ACEITE HIDRAU
NIVEL 1 - UNIDAD ENFRIAMIENTO ACEITE HIDRAU
NIVEL 1 - UNIDAD ENFRIAMIENTO ACEITE HIDRAU
NIVEL 1 - UNIDAD ENFRIAMIENTO ACEITE HIDRAU
NIVEL 1 - UNIDAD ENFRIAMIENTO ACEITE HIDRAU
NIVEL 1 - UNIDAD ENFRIAMIENTO ACEITE HIDRAU
NIVEL 1 - MOTOR 40.80.001.0516 - Montaje / Ejecución - MOTOR HIDRAULICO 1 FAJA ALIMENTADO
NIVEL 1 - MOTOR HIDRAULICO 1 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 1 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 1 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 1 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 1 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 1 FAJA ALIMENTAD
NIVEL 1 - MOTOR 40.80.001.0517 - Montaje / Ejecución - MOTOR HIDRAULICO 2 FAJA ALIMENTADO
NIVEL 1 - MOTOR HIDRAULICO 2 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 2 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 2 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 2 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 2 FAJA ALIMENTAD
NIVEL 1 - MOTOR HIDRAULICO 2 FAJA ALIMENTAD
NIVEL 6 - PUENTE 40.80.001.3101 - Montaje / Ejecución - PUENTE GRUA CHANCADO PRIMARIO ; 85
NIVEL 6 - PUENTE GRUA CHANCADO PRIMARIO
NIVEL 6 - PUENTE GRUA CHANCADO PRIMARIO
NIVEL 6 - PUENTE GRUA CHANCADO PRIMARIO
NIVEL 6 - PUENTE GRUA CHANCADO PRIMARIO
NIVEL 6 - PUENTE GRUA CHANCADO PRIMARIO
NIVEL 6 - PUENTE GRUA CHANCADO PRIMARIO
NIVEL 6 - PUENTE 40.80.001.3102 - Montaje / Ejecución - PUENTE GRUA DE MANTENCION MOTOR Y
NIVEL 6 - PUENTE GRUA DE MANTENCION MOTOR
NIVEL 6 - PUENTE GRUA DE MANTENCION MOTOR
NIVEL 6 - PUENTE GRUA DE MANTENCION MOTOR
NIVEL 6 - PUENTE GRUA DE MANTENCION MOTOR
NIVEL 6 - PUENTE GRUA DE MANTENCION MOTOR
NIVEL 6 - PUENTE GRUA DE MANTENCION MOTOR
NIVEL 1 - POLIPAS 40.80.001.3202 - Montaje / Ejecución - POLIPASTO ELECTRICO POLEA COLA FAJA
NIVEL 1 - POLIPASTO ELECTRICO POLEA COLA FAJA S
NIVEL 1 - POLIPASTO ELECTRICO POLEA COLA FAJA S
NIVEL 1 - POLIPASTO ELECTRICO POLEA COLA FAJA S
NIVEL 1 - POLIPASTO ELECTRICO POLEA COLA FAJA S
NIVEL 1 - POLIPAS 40.80.001.3203 - Montaje / Ejecución - POLIPASTO ELECTRICO POLEA COLA FAJA
NIVEL 1 - POLIPASTO ELECTRICO POLEA COLA FAJA
NIVEL 1 - POLIPASTO ELECTRICO POLEA COLA FAJA
NIVEL 1 - POLIPASTO ELECTRICO POLEA COLA FAJA
NIVEL 1 - POLIPASTO ELECTRICO POLEA COLA FAJA
NIVEL 2 - POLIPAS 40.80.001.3207 - Montaje / Ejecución - POLIPASTO ELECTRICO POLEAS FAJAS ALIM
NIVEL 2 - POLIPASTO ELECTRICO POLEAS FAJAS AL
NIVEL 2 - POLIPASTO ELECTRICO POLEAS FAJAS AL
NIVEL 2 - POLIPASTO ELECTRICO POLEAS FAJAS AL
NIVEL 2 - POLIPASTO ELECTRICO POLEAS FAJAS AL
NIVEL 6 - ELEVAD 40.80.001.3401 - Montaje / Ejecución - ELEVADOR EDIFICIO CHANCADORA PRIMA
NIVEL 6 - ELEVADOR EDIFICIO CHANCADORA PRIMA
NIVEL 6 - ELEVADOR EDIFICIO CHANCADORA PRIMA
NIVEL 6 - ELEVADOR EDIFICIO CHANCADORA PRIMA
NIVEL 6 - ELEVADOR EDIFICIO CHANCADORA PRIMA
NIVEL 6 - ELEVADOR EDIFICIO CHANCADORA PRIMA
NIVEL 1 - SISTEM 40.80.001.3501 - Montaje / Ejecución - SISTEMA COLECTOR DE POLVO CHANCADO
NIVEL 1 - SISTEMA COLECTOR DE POLVO CHANCAD
NIVEL 1 - SISTEMA COLECTOR DE POLVO CHANCAD
NIVEL 1 - SISTEMA COLECTOR DE POLVO CHANCAD
NIVEL 1 - SISTEMA COLECTOR DE POLVO CHANCAD
NIVEL 1 - SISTEMA COLECTOR DE POLVO CHANCAD
NIVEL 1 - DUCTOS 40.80.001.3502 - Montaje / Ejecución - DUCTOS SISTEMA COLECTOR DE POLVO CH
NIVEL 1 - DUCTOS SISTEMA COLECTOR DE POLVO
NIVEL 1 - DUCTOS SISTEMA COLECTOR DE POLVO
NIVEL 1 - DUCTOS SISTEMA COLECTOR DE POLVO
NIVEL 1 - DUCTOS SISTEMA COLECTOR DE POLVO
NIVEL 1 - DUCTOS SISTEMA COLECTOR DE POLVO
NIVEL 1 - VENTIL 40.80.001.3503 - Montaje / Ejecución - VENTILADOR SISTEMA COLECTOR DE POLV
NIVEL 1 - VENTILADOR SISTEMA COLECTOR DE PO
NIVEL 1 - VENTILADOR SISTEMA COLECTOR DE PO
NIVEL 1 - VENTILADOR SISTEMA COLECTOR DE PO
NIVEL 1 - VENTILADOR SISTEMA COLECTOR DE PO
NIVEL 1 - VENTILADOR SISTEMA COLECTOR DE PO
NIVEL 1 - MOTOR 40.80.001.3504 - Montaje / Ejecución - MOTOR ELECTRICO VENTILADOR SISTEMA
NIVEL 1 - MOTOR ELECTRICO VENTILADOR SISTE
NIVEL 1 - MOTOR ELECTRICO VENTILADOR SISTE
NIVEL 1 - MOTOR ELECTRICO VENTILADOR SISTE
NIVEL 1 - MOTOR ELECTRICO VENTILADOR SISTE
NIVEL 1 - MOTOR ELECTRICO VENTILADOR SISTE
NIVEL 1 - VALVUL 40.80.001.3505 - Montaje / Ejecución - VALVULA ROTATORIA SISTEMA COLECTOR
NIVEL 1 - VALVULA ROTATORIA SISTEMA COLECTO
NIVEL 1 - VALVULA ROTATORIA SISTEMA COLECTO
NIVEL 1 - VALVULA ROTATORIA SISTEMA COLECTO
NIVEL 1 - VALVULA ROTATORIA SISTEMA COLECTO
NIVEL 1 - VALVULA ROTATORIA SISTEMA COLECTO
NIVEL 1 - MOTOR 40.80.001.3506 - Montaje / Ejecución - MOTOR ELECTRICO VALVULA ROTATORIA
NIVEL 1 - MOTOR ELECTRICO VALVULA ROTATORI
NIVEL 1 - MOTOR ELECTRICO VALVULA ROTATORI
NIVEL 1 - MOTOR ELECTRICO VALVULA ROTATORI
NIVEL 1 - MOTOR ELECTRICO VALVULA ROTATORI
NIVEL 1 - MOTOR ELECTRICO VALVULA ROTATORI
NIVEL 1 - PRIMAR 40.80.001.3507 - Montaje / Ejecución - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SY
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SY
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SY
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SY
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SY
NIVEL 1 - PRIMAR 40.80.001.3508 - Montaje / Ejecución - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SY
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SY
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SY
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SY
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SY
NIVEL 1 - PRIMAR 40.80.001.3509 - Montaje / Ejecución - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMAR 40.80.001.3510 - Montaje / Ejecución - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMAR 40.80.001.3511 - Montaje / Ejecución - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SY
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SY
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SY
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SY
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SY
NIVEL 1 - PRIMAR 40.80.001.3512 - Montaje / Ejecución - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMAR 40.80.001.3513 - Montaje / Ejecución - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMAR 40.80.001.3514 - Montaje / Ejecución - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR SYS
NIVEL 1 - PRIMAR 40.80.001.3515 - Suministro, Fabricación,Montaje / Ejecución - PRIMARY CRUSHE
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR DIS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR DIS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR DIS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR DIS
NIVEL 1 - PRIMARY CRUSHER DUST COLLECTOR DIS
NIVEL 2 - COMPUE 40.80.001.3901 - Montaje / Ejecución - COMPUERTA DE LANZAS FAJA ALIMENTAD
NIVEL 2 - COMPUERTA DE LANZAS FAJA ALIMENTA
NIVEL 2 - COMPUERTA DE LANZAS FAJA ALIMENTA
NIVEL 2 - COMPUERTA DE LANZAS FAJA ALIMENTA
NIVEL 2 - COMPUERTA DE LANZAS FAJA ALIMENTA
NIVEL 2 - UNIDAD 40.80.001.3902 - Montaje / Ejecución - UNIDAD HIDRAULICA COMPUERTA DE LAN
NIVEL 2 - UNIDAD HIDRAULICA COMPUERTA DE LA
NIVEL 2 - UNIDAD HIDRAULICA COMPUERTA DE LA
NIVEL 2 - UNIDAD HIDRAULICA COMPUERTA DE LA
NIVEL 2 - UNIDAD HIDRAULICA COMPUERTA DE LA
NIVEL 2 - COMPUE 40.80.001.3903 - Montaje / Ejecución - COMPUERTA DE LANZAS FAJA ALIMENTAD
NIVEL 2 - COMPUERTA DE LANZAS FAJA ALIMENTA
NIVEL 2 - COMPUERTA DE LANZAS FAJA ALIMENTA
NIVEL 2 - COMPUERTA DE LANZAS FAJA ALIMENTA
NIVEL 2 - COMPUERTA DE LANZAS FAJA ALIMENTA
NIVEL 2 - CARRO 40.80.001.3904 - Montaje / Ejecución - CARRO MONORIEL 1 COMPUERTA DE LAN
NIVEL 2 - CARRO MONORIEL 1 COMPUERTA DE LAN
NIVEL 2 - CARRO MONORIEL 1 COMPUERTA DE LAN
NIVEL 2 - CARRO MONORIEL 1 COMPUERTA DE LAN
NIVEL 2 - CARRO MONORIEL 1 COMPUERTA DE LAN
NIVEL 2 - CARRO 40.80.001.3905 - Montaje / Ejecución - CARRO MONORIEL 2 COMPUERTA DE LAN
NIVEL 2 - CARRO MONORIEL 2 COMPUERTA DE LAN
NIVEL 2 - CARRO MONORIEL 2 COMPUERTA DE LAN
NIVEL 2 - CARRO MONORIEL 2 COMPUERTA DE LAN
NIVEL 2 - CARRO MONORIEL 2 COMPUERTA DE LAN
NIVEL 2 - CARRO 40.80.001.3906 - Montaje / Ejecución - CARRO MONORIEL 1 COMPUERTA DE LAN
NIVEL 2 - CARRO MONORIEL 1 COMPUERTA DE LAN
NIVEL 2 - CARRO MONORIEL 1 COMPUERTA DE LAN
NIVEL 2 - CARRO MONORIEL 1 COMPUERTA DE LAN
NIVEL 2 - CARRO MONORIEL 1 COMPUERTA DE LAN
NIVEL 2 - CARRO 40.80.001.3907 - Montaje / Ejecución - CARRO MONORIEL 2 COMPUERTA DE LAN
NIVEL 2 - CARRO MONORIEL 2 COMPUERTA DE LAN
NIVEL 2 - CARRO MONORIEL 2 COMPUERTA DE LAN
NIVEL 2 - CARRO MONORIEL 2 COMPUERTA DE LAN
NIVEL 2 - CARRO MONORIEL 2 COMPUERTA DE LAN
NIVEL 2 - MAGNET 40.80.001.4001 - Montaje / Ejecución - MAGNETO FAJA ALIMENTADORA 1 CHANC
NIVEL 2 - MAGNETO FAJA ALIMENTADORA 1 CHAN
NIVEL 2 - MAGNETO FAJA ALIMENTADORA 1 CHAN
NIVEL 2 - MAGNETO FAJA ALIMENTADORA 1 CHAN
NIVEL 2 - MAGNETO FAJA ALIMENTADORA 1 CHAN
NIVEL 2 - PANEL 40.80.001.4002 - Montaje / Ejecución - PANEL DE CONTROL (INC. RECTIFICADOR)
NIVEL 2 - PANEL DE CONTROL (INC. RECTIFICAD
NIVEL 2 - PANEL DE CONTROL (INC. RECTIFICAD
NIVEL 2 - PANEL DE CONTROL (INC. RECTIFICAD
NIVEL 2 - PANEL DE CONTROL (INC. RECTIFICAD
NIVEL 2 - CARRO 40.80.001.4003 - Montaje / Ejecución - CARRO MAGNETO FAJA ALIMENTADORA 1
NIVEL 2 - CARRO MAGNETO FAJA ALIMENTADORA
NIVEL 2 - CARRO MAGNETO FAJA ALIMENTADORA
NIVEL 2 - CARRO MAGNETO FAJA ALIMENTADORA
NIVEL 2 - CARRO MAGNETO FAJA ALIMENTADORA
NIVEL 2 - UNIDAD 40.80.001.4004 - Montaje / Ejecución - UNIDAD DE ENFRIAMIENTO MAGNETO FA
NIVEL 2 - UNIDAD DE ENFRIAMIENTO MAGNETO F
NIVEL 2 - UNIDAD DE ENFRIAMIENTO MAGNETO F
NIVEL 2 - UNIDAD DE ENFRIAMIENTO MAGNETO F
NIVEL 2 - UNIDAD DE ENFRIAMIENTO MAGNETO F
NIVEL 2 - MAGNET 40.80.001.4005 - Montaje / Ejecución - MAGNETO FAJA ALIMENTADORA 2 CHANC
NIVEL 2 - MAGNETO FAJA ALIMENTADORA 2 CHAN
NIVEL 2 - MAGNETO FAJA ALIMENTADORA 2 CHAN
NIVEL 2 - MAGNETO FAJA ALIMENTADORA 2 CHAN
NIVEL 2 - MAGNETO FAJA ALIMENTADORA 2 CHAN
NIVEL 2 - PANEL 40.80.001.4006 - Montaje / Ejecución - PANEL DE CONTROL (INC. RECTIFICADOR)
NIVEL 2 - PANEL DE CONTROL (INC. RECTIFICAD
NIVEL 2 - PANEL DE CONTROL (INC. RECTIFICAD
NIVEL 2 - PANEL DE CONTROL (INC. RECTIFICAD
NIVEL 2 - PANEL DE CONTROL (INC. RECTIFICAD
NIVEL 2 - CARRO 40.80.001.4007 - Montaje / Ejecución - CARRO MAGNETO FAJA ALIMENTADORA 2
NIVEL 2 - CARRO MAGNETO FAJA ALIMENTADORA
NIVEL 2 - CARRO MAGNETO FAJA ALIMENTADORA
NIVEL 2 - CARRO MAGNETO FAJA ALIMENTADORA
NIVEL 2 - CARRO MAGNETO FAJA ALIMENTADORA
NIVEL 6 - PICA RO 40.80.001.4901 - Montaje / Ejecución - PICA ROCA CHANCADORA 1 ; 12x1,9x1,9m
NIVEL 6 - PICA ROCA CHANCADORA 1
NIVEL 6 - PICA ROCA CHANCADORA 1
NIVEL 6 - PICA ROCA CHANCADORA 1
NIVEL 6 - PICA ROCA CHANCADORA 1
NIVEL 6 - UNIDAD 40.80.001.4902 - Montaje / Ejecución - UNIDAD HIDRAULICA PICA ROCA ; 1,42x0,
NIVEL 6 - UNIDAD HIDRAULICA PICA ROCA 1
NIVEL 6 - UNIDAD HIDRAULICA PICA ROCA 1
NIVEL 6 - UNIDAD HIDRAULICA PICA ROCA 1
NIVEL 6 - UNIDAD HIDRAULICA PICA ROCA 1
NIVEL 6 - MOTOR E40.80.001.4903 - Montaje / Ejecución - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 6 - MOTOR ELECTRICO UNIDAD HIDRAULICA P
NIVEL 6 - MOTOR ELECTRICO UNIDAD HIDRAULICA P
NIVEL 6 - MOTOR ELECTRICO UNIDAD HIDRAULICA P
NIVEL 6 - MOTOR ELECTRICO UNIDAD HIDRAULICA P
NIVEL 6 - PICA R 40.80.001.4904 - Montaje / Ejecución - PICA ROCA CHANCADORA 2 ; 12x1,9x1,9m
NIVEL 6 - PICA ROCA CHANCADORA 2
NIVEL 6 - PICA ROCA CHANCADORA 2
NIVEL 6 - PICA ROCA CHANCADORA 2
NIVEL 6 - PICA ROCA CHANCADORA 2
NIVEL 6 - UNIDAD 40.80.001.4905 - Montaje / Ejecución - UNIDAD HIDRAULICA PICA ROCA ; 1,42x0,
NIVEL 6 - UNIDAD HIDRAULICA PICA ROCA 2
NIVEL 6 - UNIDAD HIDRAULICA PICA ROCA 2
NIVEL 6 - UNIDAD HIDRAULICA PICA ROCA 2
NIVEL 6 - UNIDAD HIDRAULICA PICA ROCA 2
NIVEL 6 - MOTOR E40.80.001.4906 - Montaje / Ejecución - MOTOR ELECTRICO UNIDAD HIDRAULICA
NIVEL 6 - MOTOR ELECTRICO UNIDAD HIDRAULICA P
NIVEL 6 - MOTOR ELECTRICO UNIDAD HIDRAULICA P
NIVEL 6 - MOTOR ELECTRICO UNIDAD HIDRAULICA P
NIVEL 6 - MOTOR ELECTRICO UNIDAD HIDRAULICA P
26100040005 - Piping Works
FABRICACION DE T 51.20.001.0002 - Fabricate - Handling of pipe PIPE XS SMLS STL A106-B, NPS 1.00"
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.001.0003 - Fabricate - Handling of pipe PIPE XS SMLS STL A106-B, NPS 1.50"
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.001.0004 - Fabricate - Handling of pipe PIPE XS WELDED STL A53-F GALV T&
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.001.0005 - Fabricate - Handling of pipe PIPE XS WELDED STL A53-F GALV T&
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
INSTALACION DE T 51.20.001.0008 - Install / Perform - Handling of pipe PIPE XS SMLS STL A106-B, NP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.001.0009 - Install / Perform - Handling of pipe PIPE XS SMLS STL A106-B, NP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.001.0010 - Install / Perform - Handling of pipe PIPE XS WELDED STL A53-F G
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.001.0011 - Install / Perform - Handling of pipe PIPE XS WELDED STL A53-F G
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0001 - Install / Perform - Handling of 2 LUG UNIVERSAL HOSE COUPLIN
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0002 - Install / Perform - Handling of BA-04: BALL 1500 WOG SCRD CS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0003 - Install / Perform - Handling of BA-08: BALL 1000 CWP SCRD SS R
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0004 - Install / Perform - Handling of BA-08: BALL 1000 CWP SCRD SS R
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0005 - Install / Perform - Handling of BA-08: BALL 1000 CWP SCRD SS R
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0006 - Install / Perform - Handling of BA-08: BALL 1000 CWP SCRD SS R
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0007 - Install / Perform - Handling of BA-16: BALL 600# SCRD CS PTFE H
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0008 - Install / Perform - Handling of BA-16: BALL 600# SCRD CS PTFE H
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0011 - Install / Perform - Handling of CAP 300# SCRD GALV MI A197, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0012 - Install / Perform - Handling of COUPLING 300# SCRD MI A197, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0013 - Install / Perform - Handling of COUPLING 300# SCRD MI A197, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0014 - Install / Perform - Handling of COUPLING REDUCING 300# SCRD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0015 - Install / Perform - Handling of ELL 45 DEG 300# SCRD MI A197, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0016 - Install / Perform - Handling of ELL 90 DEG 300# SCRD GALV MI A
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0017 - Install / Perform - Handling of ELL 90 DEG 300# SCRD GALV MI A
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0018 - Install / Perform - Handling of ELL 90 DEG 300# SCRD MI A197, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0019 - Install / Perform - Handling of ELL 90 DEG 300# SCRD MI A197, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0021 - Install / Perform - Handling of FLG SCRD 150# RF GALV STL A105
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0022 - Install / Perform - Handling of FLG SCRD 150# RF GALV STL A105
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0023 - Install / Perform - Handling of FLG SCRD 150# RF STL A105, NPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0024 - Install / Perform - Handling of FLG SCRD 150# RF STL A105, NPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0026 - Install / Perform - Handling of GL-03: GLOBE 800# SCRD CS F6/S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0027 - Install / Perform - Handling of NIPPLE XS GALV STL A106-B TBE 4
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0028 - Install / Perform - Handling of NIPPLE XS GALV STL A106-B TBE 4
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0029 - Install / Perform - Handling of NIPPLE XS GALV STL A106-B TBE 4
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0030 - Install / Perform - Handling of NIPPLE XS STL A106-B PBE 3" LON
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0031 - Install / Perform - Handling of NIPPLE XS STL A106-B PBE 3" LON
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0032 - Install / Perform - Handling of NIPPLE XS STL A106-B TBE 3" LON
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0033 - Install / Perform - Handling of NIPPLE XS STL A106-B TBE 3" LON
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0034 - Install / Perform - Handling of NIPPLE XS STL A106-B TBE 4" LON
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0035 - Install / Perform - Handling of NIPPLE XS STL A106-B TBE 4" LON
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0036 - Install / Perform - Handling of PLUG SQ HEAD 300# SCRD MI A1
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0037 - Install / Perform - Handling of PLUG SQUARE HEAD SCRD GALV
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0038 - Install / Perform - Handling of REDUCER 1.5x2 300# SCRD GALV
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0039 - Install / Perform - Handling of SWAGE CONC 1.5x1 XS STL A234
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0040 - Install / Perform - Handling of TEE 300# SCRD GALV MI A197, NP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0041 - Install / Perform - Handling of TEE 300# SCRD GALV MI A197, NP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0042 - Install / Perform - Handling of TEE 300# SCRD MI A197, NPS 1.00
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0043 - Install / Perform - Handling of TEE RED 1.5x1 300# SCRD MI A19
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0044 - Install / Perform - Handling of LUG 4 LUG UNIVERSAL HOSE COU
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0046 - Install / Perform - Handling of NIPPLE SCH 40S 316/316L SS PBE
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
FABRICACION DE T 51.30.001.0001 - Fabricate - Butt Weld / Slip-on SS, NPS 1.00", Schedule SCH XS
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0003 - Fabricate - Butt Weld / Slip-on CS, NPS 12.00", Schedule SCH10S
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0006 - Fabricate - Butt Weld / Slip-on SS, NPS 2.00", Schedule SCH XS
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0007 - Fabricate - Butt Weld / Slip-on CS, NPS 3.00", Schedule SCH10S
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0008 - Fabricate - Butt Weld / Slip-on SS, NPS 3.00", Schedule SCH STD
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0009 - Fabricate - Butt Weld / Slip-on SS, NPS 4.00", Schedule SCH STD
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0010 - Fabricate - Butt Weld / Slip-on CS, NPS 6.00", Schedule SCH10S
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0011 - Fabricate - Butt Weld / Slip-on SS, NPS 6.00", Schedule SCH STD
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0014 - Fabricate - Socket Weld CS, NPS 1.00", Schedule SCH STD
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0015 - Fabricate - Socket Weld CS, NPS 1.50", Schedule SCH STD
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0016 - Fabricate - Socket Weld SS, NPS 2.00", Schedule SCH40S
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
INSTALACION DE T 51.40.001.0001 - Install / Perform - RT, NPS 3.00", Schedule SCH10S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0002 - Install / Perform - RT, NPS 4.00", Schedule SCH10S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0004 - Install / Perform - RT, NPS 10.00", Schedule SCH10S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0005 - Install / Perform - RT, NPS 18.00", Schedule SCH10S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0007 - Install / Perform - RT, NPS 0.75", Schedule SCH40S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0014 - Install / Perform - RT, NPS 20.00", Schedule SCH STD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0015 - Install / Perform - RT, NPS 0.50", Schedule SCH80S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0016 - Install / Perform - RT, NPS 0.75", Schedule SCH80S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0017 - Install / Perform - RT, NPS 1.00", Schedule SCH80S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0018 - Install / Perform - RT, NPS 2.00", Schedule SCH80S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0021 - Install / Perform - RT, NPS 6.00", Schedule SCH STD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0022 - Install / Perform - RT, NPS 8.00", Schedule SCH STD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0023 - Install / Perform - RT, NPS 12.00", Schedule SCH STD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0027 - Install / Perform - RT, NPS 1.00", Schedule SCH XS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0028 - Install / Perform - RT, NPS 1.50", Schedule SCH XS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0029 - Install / Perform - RT, NPS 2.00", Schedule SCH XS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0030 - Install / Perform - RT, NPS 3.00", Schedule SCH XS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0031 - Install / Perform - RT, NPS 4.00", Schedule SCH XS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0032 - Install / Perform - RT, NPS 6.00", Schedule SCH XS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0002 - Install / Perform - HYDROSTATIC of PIPE XS SMLS STL A106-B, NP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0003 - Install / Perform - HYDROSTATIC of PIPE XS SMLS STL A106-B, NP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0004 - Install / Perform - HYDROSTATIC of PIPE XS WELDED STL A53-F G
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0005 - Install / Perform - HYDROSTATIC of PIPE XS WELDED STL A53-F G
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0006 - Install / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E B
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0007 - Install / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E B
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0008 - Install / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E B
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0009 - Install / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E B
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0011 - Install / Perform - HYDROSTATIC of PIPE XS SMLS STL A106-B, NP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0012 - Install / Perform - HYDROSTATIC of PIPE XS WELDED STL A53-F G
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0018 - Install / Perform - HYDROSTATIC of PIPE SCH 10S EFW 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0019 - Install / Perform - HYDROSTATIC of PIPE SCH 10S EFW 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0024 - Install / Perform - HYDROSTATIC of PIPE SCH 40S SMLS 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0002 - Install / Perform - Double handling of CS A106, NPS 0.75", Sched
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0004 - Install / Perform - Double handling of CS A106, NPS 1.50", Sched
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0005 - Install / Perform - Double handling of CS A106, NPS 2.00", Sched
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0006 - Install / Perform - Double handling of CS A53, NPS 3.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0007 - Install / Perform - Double handling of CS A53, NPS 4.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0008 - Install / Perform - Double handling of CS A53, NPS 6.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0009 - Install / Perform - Double handling of SS 304, NPS 0.75", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0010 - Install / Perform - Double handling of SS 304, NPS 2.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0011 - Install / Perform - Double handling of SS 304, NPS 3.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0012 - Install / Perform - Double handling of SS 304, NPS 4.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0013 - Install / Perform - Double handling of SS 304, NPS 6.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0014 - Install / Perform - Double handling of SS 304, NPS 0.50", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0015 - Install / Perform - Double handling of SS 304, NPS 0.75", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0016 - Install / Perform - Double handling of SS 304, NPS 1.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0017 - Install / Perform - Double handling of SS 304, NPS 2.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0018 - Install / Perform - Double handling of SS 316, NPS 3.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0019 - Install / Perform - Double handling of SS 316, NPS 6.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0020 - Install / Perform - Double handling of SS 316, NPS 3.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0021 - Install / Perform - Double handling of SS 316, NPS 6.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0022 - Install / Perform - Double handling of SS 316, NPS 1.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0023 - Install / Perform - Double handling of SS 316, NPS 2.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0002 - Install / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0003 - Install / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0004 - Install / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0005 - Install / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0006 - Install / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0007 - Install / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0008 - Install / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0009 - Install / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0012 - Install / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0013 - Install / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0019 - Install / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0020 - Install / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0025 - Install / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/31
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0001 - Install / Perform - HANDLING of pipe BA-08: BALL 1000 CWP SCR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0002 - Install / Perform - HANDLING of pipe BA-16: BALL 600# SCRD CS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0003 - Install / Perform - HANDLING of pipe BU-10: BUTTERFLY LUG 150
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0004 - Install / Perform - HANDLING of pipe BU-12: BUTTERFLY LUG HP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0005 - Install / Perform - HANDLING of pipe CAP 300# SCRD GALV MI A
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0009 - Install / Perform - HANDLING of pipe CH-20: CHECK DUAL PLATE
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0010 - Install / Perform - HANDLING of pipe CH-30: CHECK 150# CS WAF
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0011 - Install / Perform - HANDLING of pipe COUPLING 300# SCRD MI A
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0012 - Install / Perform - HANDLING of pipe COUPLING REDUCING 300#
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0013 - Install / Perform - HANDLING of pipe ELL 45 DEG STD WT STL A2
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0017 - Install / Perform - HANDLING of pipe ELL 90 DEG 300# SCRD GAL
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0019 - Install / Perform - HANDLING of pipe ELL 90 DEG 300# SCRD MI A
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0020 - Install / Perform - HANDLING of pipe ELL 90 DEG 3D STD WT CS A
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0021 - Install / Perform - HANDLING of pipe ELL 90 DEG LR STD WT STL
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0022 - Install / Perform - HANDLING of pipe ELL 90 DEG LR STD WT STL
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0026 - Install / Perform - HANDLING of pipe FLG BLIND 150# RF STL A10
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0027 - Install / Perform - HANDLING of pipe FLG SCRD 150# RF GALV ST
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0028 - Install / Perform - HANDLING of pipe FLG SCRD 150# RF GALV ST
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0029 - Install / Perform - HANDLING of pipe FLG SCRD 150# RF STL A105
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0030 - Install / Perform - HANDLING of pipe FLG SO 150# RF STL A105, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0031 - Install / Perform - HANDLING of pipe FLG SO 150# RF STL A105, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0032 - Install / Perform - HANDLING of pipe FLG SO 150# RF STL A105, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0033 - Install / Perform - HANDLING of pipe FLG SO 150# RF STL A105, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0034 - Install / Perform - HANDLING of pipe FLG SO 150# RF STL A105, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0035 - Install / Perform - HANDLING of pipe GA-05: GATE 125# FF DI UL
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0042 - Install / Perform - HANDLING of pipe SOCKOLET 3x1 3000# STL A
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0044 - Install / Perform - HANDLING of pipe SWAGE CONC 3x2 XS STL A
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0045 - Install / Perform - HANDLING of pipe TEE 300# SCRD MI A197, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0046 - Install / Perform - HANDLING of pipe TEE RED 2x1 300# SCRD GA
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0047 - Install / Perform - HANDLING of pipe TEE RED 2x0.75 300# SCRD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0048 - Install / Perform - HANDLING of pipe TEE RED 2x1 300# SCRD MI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0050 - Install / Perform - HANDLING of pipe TEE STD WT STL A234 WPB
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0051 - Install / Perform - HANDLING of pipe TEE STD WT STL A234 WPB
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0053 - Install / Perform - HANDLING of pipe THREDOLET 4x2 3000# STL
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0054 - Install / Perform - HANDLING of pipe BA-10: BALL VALVE 2000 W
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0055 - Install / Perform - HANDLING of pipe BU-22: BUTTEFLY LUG HP 1
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0056 - Install / Perform - HANDLING of pipe BU-22: BUTTEFLY LUG HP 1
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0060 - Install / Perform - HANDLING of pipe CAP SCH 10S 316/316L SS A
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0061 - Install / Perform - HANDLING of pipe COUPLING RED 300# SW 31
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0062 - Install / Perform - HANDLING of pipe ELL 45 DEG 3000# SW 316/
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0065 - Install / Perform - HANDLING of pipe ELL 90 DEG 3000# SW 316/
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0068 - Install / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0069 - Install / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0077 - Install / Perform - HANDLING of pipe FLG SO 150# RF 316/316L S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0081 - Install / Perform - HANDLING of pipe FLG SW 150# RF 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0083 - Install / Perform - HANDLING of pipe GL-11: GLOBE 800# SW SS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0084 - Install / Perform - HANDLING of pipe NIPPLE SCH 40S 316/316L S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0089 - Install / Perform - HANDLING of pipe SOCKOLET 3X2 3000# 316/
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0090 - Install / Perform - HANDLING of pipe SOCKOLET 6X2 3000# 316/
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0091 - Install / Perform - HANDLING of pipe TEE 3000# SW 316/316L SS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0092 - Install / Perform - HANDLING of pipe RED TEE 6X3 SCH 10S 316/
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0094 - Install / Perform - HANDLING of pipe TEE SCH 10S 316/316L SS A
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0095 - Install / Perform - HANDLING of pipe UNION 3000# SW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0001 - Install / Perform - Butt Weld / Slip-on SS, NPS 1.00", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0007 - Install / Perform - Butt Weld / Slip-on CS, NPS 3.00", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0008 - Install / Perform - Butt Weld / Slip-on SS, NPS 3.00", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0009 - Install / Perform - Butt Weld / Slip-on SS, NPS 4.00", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0010 - Install / Perform - Butt Weld / Slip-on CS, NPS 6.00", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0015 - Install / Perform - Butt Weld / Slip-on CS, NPS 1.50", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0016 - Install / Perform - Butt Weld / Slip-on SS, NPS 2.00", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0002 - Install / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0003 - Install / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0004 - Install / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0005 - Install / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0006 - Install / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0007 - Install / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0008 - Install / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0009 - Install / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0011 - Install / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0012 - Install / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0018 - Install / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0019 - Install / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0024 - Install / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/31
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
26100040007 - I&C Works
TRANSMISOR 70.20.001.00X1 - Montaje / Ejecución - Interruptor de nivel nuclear (With Auotma
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR 70.20.001.0009 - Montaje / Ejecución - Transmisor Flujo Tipo Magnético
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR 70.20.001.0010 - Montaje / Ejecución - Transmisor Flujo Tipo Coriolis
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
INDICADOR 70.20.001.0016 - Montaje / Ejecución - Indicadores de Presión sin/con Sello
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INDICADOR 70.20.001.0018 - Montaje / Ejecución - Indicadores de Presión Diferencial sin Sello
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INTERRUPTOR 70.20.001.0020 - Montaje / Ejecución - Interruptores de Presión sin/con Sello
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
TRANSMISOR 70.20.001.0022 - Montaje / Ejecución - Transmisores de Presión sin/con Sello
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR 70.20.001.0023 - Montaje / Ejecución - Transmisores de Presión Diferencial con S
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR 70.20.001.0026 - Montaje / Ejecución - Transmisor de Nivel Celdas de Flotación
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR 70.20.001.0028 - Montaje / Ejecución - Transmisor de Nivel Tipo Ultrasónico 1” N
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR 70.20.001.0029 - Montaje / Ejecución - Transmisor de Nivel Tipo Radar Flanged
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
INTERRUPTOR 70.20.001.0030 - Montaje / Ejecución - Interruptor de Nivel Vibratorio
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
SENSOR 70.20.001.0031 - Montaje / Ejecución - Sensor Temperatura
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
TRANSMISOR 70.20.001.0032 - Montaje / Ejecución - Transmisor de Temperatura
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
INDICADOR 70.20.001.0034 - Montaje / Ejecución - Indicador de Temperatura Local (Termóme
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INDICADOR 70.20.001.0035 - Montaje / Ejecución - Indicadores Remotos
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INDICADOR
SEMAFORO 70.20.001.0037 - Montaje / Ejecución - Semáforos
SEMAFORO
SEMAFORO
SEMAFORO
SEMAFORO
SEMAFORO
SIRENA 70.20.001.0038 - Montaje / Ejecución - Sirena (Horn)
SIRENA
SIRENA
SIRENA
SIRENA
SIRENA
BALIZA 70.20.001.0039 - Montaje / Ejecución - Baliza (Beacon)
BALIZA
BALIZA
BALIZA
BALIZA
BALIZA
SENSOR 70.20.001.0045 - Montaje / Ejecución - Sensor/Interruptor de Velocidad
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR 70.20.001.0049 - Montaje / Ejecución - Sensor/Transmisor de Vibración
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR 70.20.001.0053 - Montaje / Ejecución - Sensor transmision de posicion
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
DETECTOR 70.20.001.0055 - Montaje / Ejecución - Detectores de Camiones
DETECTOR
DETECTOR
DETECTOR
DETECTOR
DETECTOR
INTERRUPTOR 70.20.001.00X2 - Montaje / Ejecución - Interruptor de posición cerrado / abierto
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
ANALIZADOR 70.20.003.0001 - Montaje / Ejecución - Cámara Analizador Tamaño de Roca
ANALIZADOR
ANALIZADOR
ANALIZADOR
ANALIZADOR
ANALIZADOR
UNIDAD DE COMUN70.20.003.0002 - Montaje / Ejecución - Unidad de Comunicaciones y alimentación
UNIDAD DE COMUNICACIÓN
UNIDAD DE COMUNICACIÓN
UNIDAD DE COMUNICACIÓN
UNIDAD DE COMUNICACIÓN
UNIDAD DE COMUNICACIÓN
ILUMINACION 70.20.003.0003 - Montaje / Ejecución - Sistema de Iluminación Cámaras Analizado
ILUMINACION
ILUMINACION
ILUMINACION
ILUMINACION
ILUMINACION
DETECTOR 70.20.003.0010 - Montaje / Ejecución - Detector Manga Rota
DETECTOR
DETECTOR
DETECTOR
DETECTOR
DETECTOR
MANIFOLD 70.20.004.0005 - Montaje / Ejecución - Manifold Aire Instrumentación (AM)
MANIFOLD
MANIFOLD
MANIFOLD
MANIFOLD
MANIFOLD
PANEL 70.20.005.0001 - Montaje / Ejecución - Panel Paquete Mecánico Tipo # 1 (Hasta 4
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL 70.20.005.0002 - Montaje / Ejecución - Panel Paquete Mecánico Tipo # 2 (Entre 41
PANEL
PANEL
PANEL
PANEL
PANEL
CAJA DE CONEXIÓN70.20.005.0005 - Montaje / Ejecución - Caja de Conexionado para Válvulas
CAJA DE CONEXIÓN
CAJA DE CONEXIÓN
CAJA DE CONEXIÓN
CAJA DE CONEXIÓN
CAJA DE CONEXIÓN
TABLERO 70.20.006.0002 - Montaje / Ejecución - Tablero de Alimentación para Instrumenta
TABLERO
TABLERO
TABLERO
TABLERO
TABLERO
PLACA DE MONTAJ70.20.008.0005 - Suministro / Instalación - Suministro e Instalación Placa de Mon
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
CAMARA CCTV 70.20.008.0009 - Suministro / Instalación - Soporte de Instalación cámaras CCTV T
CAMARA CCTV
CAMARA CCTV
CAMARA CCTV
CAMARA CCTV
CAMARA CCTV
MONTAJE INSTRU 70.40.002.0001 - Montaje / Ejecución - Caja de Terreno PROFIBUS PA
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.40.002.0002 - Montaje / Ejecución - Caja de Terreno MONITOREO DE CONDICIO
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.40.002.0005 - Montaje / Ejecución - Rack Remoto (IO Block Terreno)
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.50.001.0002 - Montaje / Ejecución - Estaciones de Teléfono de Terreno
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.50.001.0003 - Montaje / Ejecución - Bocinas
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.50.001.0005 - Montaje / Ejecución - Gabinetes Comunicaciones en Terreno
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.60.001.0002 - Montaje / Ejecución - Cámaras CCTV OUTDOOR
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.60.001.0003 - Montaje / Ejecución - Gabinete CCTV Outdoor (Power & Signal)
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.70.002.0001 - Montaje / Ejecución - Instalacion Laboratorio de Pruebas Instrum
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.80.001.0001 - Montaje / Ejecución - Bandejas de protección para tubing
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.80.001.0002 - Montaje / Ejecución - Tubing Aire Instrumentación
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
2610006 - Corrugated Tunnel at Exit Crusher Building
26100060000 - Civil Works (No se encuentra en Bill Quantity)
ALCANTARILLA 00.25.002.0001 - Montaje / Ejecución - Excavación de Canales y Zanjas de Drenaje
ALCANTARILLA
ALCANTARILLA 00.40.005.0009 - Montaje / Ejecución - Túnel acero corrugado galvanizado MP152
ALCANTARILLA
26100060001 - Concrete Works
PERNO 10.20.001.0001 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0002 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0101 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0102 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0003 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0004 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0103 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0104 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.002.0001 - Suministro - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
PERNO 10.20.002.0002 - Montaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
MORTERO NIVELAC10.30.001.0001 - Suministro - Mortero de nivelación cementicio sin retracción
MORTERO NIVELACION
MORTERO NIVELAC10.30.001.0002 - Montaje/Ejecución - Mortero de nivelación cementicio sin retrac
MORTERO NIVELACION
MORTERO NIVELACION
MORTERO NIVELACION
MORTERO NIVELAC10.30.001.0003 - Suministro - Mortero de nivelación epóxico
MORTERO NIVELACION
MORTERO NIVELAC10.30.001.0004 - Montaje/Ejecución - Mortero de nivelación epóxico
MORTERO NIVELACION
MORTERO NIVELACION
MORTERO NIVELACION
ACERO REFUERZO 10.40.001.0002 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0005 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0009 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0029 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0030 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0040 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0042 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
CONCRETO 10.40.002.2169 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2805 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2809 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2829 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2830 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2840 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2842 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.60.002.1061 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
26100060002 - Steel Works
ESTRUCTURA ACERO 20.10.005.0003 - Montaje / Ejecución - Rejilla de Piso - Acero Carbono 32mm x 5m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
2610009 - Primary Crusher DataCenter (Only Erection)
26100090002 - Steel Works
ESTRUCTURA ACER20.10.001.0003 - Montaje / Ejecución - Acero Estructural Liviano (<= 30 kg/m)
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0103 - Montaje / Ejecución - Acero Estructural Mediano (> 30 kg/m y <=
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0203 - Montaje / Ejecución - Acero Estructural Pesado (> 60 kg/m y <=
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO 20.10.005.0003 - Montaje / Ejecución - Rejilla de Piso - Acero Carbono 32mm x 5m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.006.0003 - Montaje / Ejecución - Baranda de acero con Guardapies
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0003 - Montaje / Ejecución - Estructura Ensamblada Liviana (<= 30 kg/m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0103 - Montaje / Ejecución - Estructura Ensamblada Mediana (> 30 kg/
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0203 - Montaje / Ejecución - Estructura Ensamblada Pesada (> 60 kg/m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
26100090003 - Architecture Works
REVESTIMIENTO 30.10.001.2001 - Montaje / Ejecución - Revestimiento de Techo Plancha sin Aislac
REVESTIMIENTO
REVESTIMIENTO
REVESTIMIENTO
REVESTIMIENTO 30.10.002.2003 - Montaje / Ejecución - Revestimiento Lateral Plancha con Aislació
REVESTIMIENTO
REVESTIMIENTO
REVESTIMIENTO
26100090007 - I&C Works (No se encuentra en Bill Quantity)
2610016 - Platform Earthworks Mine Primary Crusher (Excavation & Backfill Type B)
26100160000 - Civil Works
EXCAVACION 00.25.004.0001 - Montaje / Ejecución - Excavación Masiva en Terreno Común
EXCAVACION
EXCAVACION 00.25.007.0001 - Montaje / Ejecución - Excavación Masiva con Ripper
EXCAVACION
EXCAVACION 00.25.007.0002 - Montaje / Ejecución - Excavación Masiva en Roca
EXCAVACION
RELLENO 00.30.001.0004 - Montaje/Ejecución - Grava de Aislación, Tmáx 1 1/2"
RELLENO
RELLENO 00.30.004.0002 - Montaje/Ejecución - Relleno Masivo Clase B
RELLENO
RELLENO 00.30.004.0003 - Montaje / Ejecución - Relleno Masivo Clase C
RELLENO
RELLENO 00.30.007.0001 - Montaje/Ejecución - Preparación de Subrasante
RELLENO
RELLENO 00.30.007.0002 - Montaje/Ejecución - Perfilado de Plataformas
RELLENO
RELLENO 00.40.002.0001 - Afirmado granular para plataformas y caminos
RELLENO
BERMA 00.40.007.0002 - Montaje / Ejecución - Pretil de seguridad h=0,8m
BERMA
2630 - Primary Crusher Subestation & Electrical Room
2630001 - Primary Crusher Electrical Room (2630-ER-001) (Include Sub-station)
26300010000 - Civil Works (No se encuentra en Bill Quantity)
EXCAVACION 00.25.001.0001 - Grounding system excavation
EXCAVACION
EXCAVACION 00.25.001.0002 - Burried Conduit excavation
EXCAVACION
EXCAVACION 00.25.003.0001 - - Duct Bank excavation
EXCAVACION
EXCAVACION 00.25.003.0002 - - Manhole excavation
EXCAVACION
EXCAVACION 00.25.003.0003 - - Lighting pole foundation excavation
EXCAVACION
RELLENO 00.30.002.0001 - Grounding system backfill and compaction
RELLENO
RELLENO 00.30.002.0002 - Burried conduit backfill and compaction
RELLENO
RELLENO 00.30.003.0004 - Montaje/Ejecución - Duct Bank backfill and compaction
RELLENO
RELLENO 00.30.003.0005 - Montaje/Ejecución - Manhole backfill and compaction
RELLENO
RELLENO 00.30.003.0006 - Montaje/Ejecución - Lighting pole foundation backfill and compa
RELLENO
26300010001 - Concrete Works
PERNO 10.20.001.0001 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0002 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0101 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0102 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0003 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0004 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0103 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0104 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.002.0001 - Suministro - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
PERNO 10.20.002.0002 - Montaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
ACERO REFUERZO 10.40.001.0001 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0003 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0005 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0009 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0010 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0020 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0021 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0022 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0026 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0064 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0069 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
CONCRETO 10.40.002.2169 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2801 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2803 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2805 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2809 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2810 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2820 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2821 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2822 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2826 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.1564 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.1565 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.60.002.1061 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.60.002.1062 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
26300010002 - Steel Works
ESTRUCTURA ACER20.10.001.0003 - Montaje / Ejecución - Acero Estructural Liviano (<= 30 kg/m)
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0103 - Montaje / Ejecución - Acero Estructural Mediano (> 30 kg/m y <=
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
26300010006 - Electrical Works
ESCALERILLA POR 60.20.001.0003 - Montaje / Ejecución - Escalerilla portaconductores, acero galvan
ESCALERILLA PORTACONDUCTOR
ESCALERILLA PORTACONDUCTOR
ESCALERILLA PORTACONDUCTOR
ESCALERILLA POR 60.20.001.0005 - Montaje / Ejecución - Escalerilla portaconductores, acero galvan
ESCALERILLA PORTACONDUCTOR
ESCALERILLA PORTACONDUCTOR
ESCALERILLA PORTACONDUCTOR
ESCALERILLA POR 60.20.001.0006 - Montaje / Ejecución - Escalerilla portaconductores, acero galvan
ESCALERILLA PORTACONDUCTOR
ESCALERILLA PORTACONDUCTOR
ESCALERILLA PORTACONDUCTOR
BANDEJA 60.20.001.0026 - Montaje / Ejecución - Bandeja portaconductores, acero galvaniz
BANDEJA
BANDEJA
BANDEJA
CONDUIT 60.20.002.0002 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0003 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0004 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0005 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0006 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0007 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0032 - Montaje / Ejecución - Conduit a la vista, acero flexible y cubierta
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0043 - Montaje / Ejecución - Conduit directamente enterrado, acero ga
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0057 - Montaje / Ejecución - Conduit en banco de ductos, PVC Schedule
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0058 - Montaje / Ejecución - Conduit en banco de ductos, PVC Schedule
CONDUIT
CONDUIT
CONDUIT
CABLE 60.30.001.1103 - Montaje / Ejecución - Monoconductor de cobre, clase 25 kV, apa
CABLE
CABLE
CABLE
CABLE 60.30.001.3103 - Montaje / Ejecución - Monoconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
CABLE 60.30.001.3305 - Montaje / Ejecución - Monoconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
CABLE 60.30.001.3306 - Montaje / Ejecución - Monoconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
CABLE 60.30.001.3310 - Montaje / Ejecución - Monoconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
CABLE 60.30.001.3311 - Montaje / Ejecución - Monoconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
CABLE 60.30.001.6102 - Montaje / Ejecución - Monoconductor de fuerza, cobre, clase 60
CABLE
CABLE
CABLE
CABLE 60.30.001.6104 - Montaje / Ejecución - Monoconductor de fuerza, cobre, clase 60
CABLE
CABLE
CABLE
CABLE 60.30.001.6305 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.6306 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.6307 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.6309 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.6313 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.6314 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.6409 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.6410 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.6411 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.6412 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.6413 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.6414 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.6511 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.6513 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.6514 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.7002 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.001.7012 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.001.8011 - Montaje / Ejecución - Multi-triada, conductor de cobre, clase 30
CABLE
CABLE
CABLE
CABLE 60.30.001.8012 - Montaje / Ejecución - Multi-triada, conductor de cobre, clase 30
CABLE
CABLE
CABLE
CABLE 60.30.001.9113 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
CABLE 60.30.001.9114 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
CABLE 60.30.002.1103 - Montaje / Ejecución - Monoconductor de cobre, clase 25 kV, apa
CABLE
CABLE
CABLE
CABLE 60.30.002.1306 - Montaje / Ejecución - Multiconductor de cobre, clase 25 kV, apa
CABLE
CABLE
CABLE
CABLE 60.30.002.1307 - Montaje / Ejecución - Multiconductor de cobre, clase 25 kV, apa
CABLE
CABLE
CABLE
CABLE 60.30.002.1405 - Montaje / Ejecución - Multiconductor de cobre, clase 25 kV, apa
CABLE
CABLE
CABLE
CABLE 60.30.002.3103 - Montaje / Ejecución - Monoconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
CABLE 60.30.002.3105 - Montaje / Ejecución - Monoconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
CABLE 60.30.002.3305 - Montaje / Ejecución - Multiconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
CABLE 60.30.002.3306 - Montaje / Ejecución - Multiconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
CABLE 60.30.002.3310 - Montaje / Ejecución - Multiconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
CABLE 60.30.002.3311 - Montaje / Ejecución - Multiconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
CABLE 60.30.002.6102 - Montaje / Ejecución - Monoconductor de fuerza, cobre, clase 60
CABLE
CABLE
CABLE
CABLE 60.30.002.6104 - Montaje / Ejecución - Monoconductor de fuerza, cobre, clase 60
CABLE
CABLE
CABLE
CABLE 60.30.002.6305 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6306 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6307 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6309 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6312 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6313 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6314 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6315 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6409 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6410 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6411 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6412 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6413 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6414 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6511 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6513 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6514 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.7002 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7012 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7021 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7022 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7221 - Montaje / Ejecución - Par apantallado, conductor de cobre, Clas
CABLE
CABLE
CABLE
CABLE 60.30.002.7331 - Montaje / Ejecución - Cable de Instrumentación 1x1t;# 18 AWG
CABLE
CABLE
CABLE
CABLE 60.30.002.7334 - Montaje / Ejecución - Multi-triada, conductor de cobre, clase 30
CABLE
CABLE
CABLE
CABLE 60.30.002.7338 - Montaje / Ejecución - Multi-triada, conductor de cobre, clase 30
CABLE
CABLE
CABLE
CABLE 60.30.002.8101 - Montaje / Ejecución - Cable Profibus PA 1x1p;# 18 AWG, Tipo A
CABLE
CABLE
CABLE
CABLE 60.30.002.8102 - Montaje / Ejecución - Cable Profibus DP 1x1p;# 22 AWG Tipo A
CABLE
CABLE
CABLE
CABLE 60.30.002.8300 - Montaje / Ejecución - Cable Ethernet (UTP)
CABLE
CABLE
CABLE
CABLE 60.30.002.9114 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
PUESTA A TIERRA 60.40.001.0001 - Montaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.001.0002 - Montaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0001 - Montaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0002 - Montaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0003 - Montaje / Ejecución - Monoconductor de fuerza, cobre, aislado,
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.003.0001 - Montaje / Ejecución - Ground Bar In Man Holes (Supplied and in
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.004.0001 - Montaje / Ejecución - Ground Rod 3/4"x3m (Supplied and instal
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.005.0001 - Montaje / Ejecución - Conexionado Cable de Aterrizamiento 1x1
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PARARRAYOS 60.40.006.0004 - Montaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", c
PARARRAYOS
PARARRAYOS
PARARRAYOS
PARARRAYOS 60.40.006.0005 - Montaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", c
PARARRAYOS
PARARRAYOS
PARARRAYOS
CABLE 60.50.001.1123 - Montaje / Ejecución - CABLE TERMINATION KIT, 1/C MCM 350, 2
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.1406 - Montaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 2/0, 2
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.1407 - Montaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 1/0, 2
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.3103 - Montaje / Ejecución - CABLE TERMINATION KIT, 1/C MCM 350, 5
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.3105 - Montaje / Ejecución - CABLE TERMINATION KIT, 1/C AWG 4/0, 5
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.3405 - Montaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 4/0, 5
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.3406 - Montaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 2/0, 5
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.3410 - Montaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 4, 5 KV
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.3411 - Montaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 6, 5 KV
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6102 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, SINGLE CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6104 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, SINGLE CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6305 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6306 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6307 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6309 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6312 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6313 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6314 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6315 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6409 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6410 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6411 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6412 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6413 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6414 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6511 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6513 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6514 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7002 - Montaje / Ejecución - TERMINATION OF CONTROL CABLE, 600 V
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7012 - Montaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI C
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7021 - Montaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI C
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7022 - Montaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI C
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7026 - Montaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI C
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7221 - Montaje / Ejecución - TERM OF CONTROL CABLE, 300 V, PAR, 1 X
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7331 - Montaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI T
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7334 - Montaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI T
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7338 - Montaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI T
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.8101 - Montaje / Ejecución - Terminal para Cable Profibus PA 1x1p;# 18
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.8102 - Montaje / Ejecución - Terminal para Cable Profibus DP 1x1p;# 22
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.8300 - Montaje / Ejecución - Terminal para Cable Ethernet UTP ( n° DE
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.9114 - Montaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE
CABLE
CABLE
CABLE
CABLE
ACCESORIO ELECTR60.60.002.0002 - Montaje / Ejecución - Estación de control local (Botonera), "Para
ACCESORIO ELECTRICO
ACCESORIO ELECTRICO
ACCESORIO ELECTRICO
ACCESORIO ELECTR60.60.002.0004 - Montaje / Ejecución - THREE PHASE RECEPTACLE ASSEMBLY, 600
ACCESORIO ELECTRICO
ACCESORIO ELECTRICO
ACCESORIO ELECTRICO
ACCESORIO ELECTR60.60.002.0005 - Montaje / Ejecución - SINGLE PHASE RECEPTACLE ASSEMBLY, 60
ACCESORIO ELECTRICO
ACCESORIO ELECTRICO
ACCESORIO ELECTRICO
LUMINARIA 60.60.005.0004 - Montaje / Ejecución - Luminaria industrial LED, montaje colgant
LUMINARIA
LUMINARIA
LUMINARIA
LUMINARIA 60.60.005.0014 - Montaje / Ejecución - Luminaria industrial LED, montaje a cielo,
LUMINARIA
LUMINARIA
LUMINARIA
LUMINARIA 60.60.005.0034 - Montaje / Ejecución - Luminaria industrial LED, montaje en muro
LUMINARIA
LUMINARIA
LUMINARIA
PROYECTOR LED 60.60.005.0061 - Montaje / Ejecución - Proyector industrial LED, montaje en muro
PROYECTOR LED
PROYECTOR LED
PROYECTOR LED
PROYECTOR LED 60.60.005.0062 - Montaje / Ejecución - Proyector industrial LED, montaje en muro
PROYECTOR LED
PROYECTOR LED
PROYECTOR LED
PROYECTOR LED 60.60.005.0071 - Montaje / Ejecución - Equipo alumbrado público (1 unidad), LED
PROYECTOR LED
PROYECTOR LED
PROYECTOR LED
ILUMINACION EME60.60.005.0092 - Montaje / Ejecución - Equipo de alumbrado de emergencia, mon
ILUMINACION EMERGENCIA
ILUMINACION EMERGENCIA
ILUMINACION EMERGENCIA
ILUMINACION EME60.60.005.0202 - Montaje / Ejecución - Corona móvil de iluminación de 10 lumina
ILUMINACION EMERGENCIA
ILUMINACION EMERGENCIA
ILUMINACION EMERGENCIA
TRANSFORMADOR 60.70.001.0001 - Montaje / Ejecución - DISTRIBUTION TRANSFORMER, 7,5 MVA, 2
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.001.0002 - Montaje / Ejecución - DISTRIBUTION TRANSFORMER, 7,5 MVA, 2
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.001.0003 - Montaje / Ejecución - DISTRIBUTION TRANSFORMER, 2,5 MVA,
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.001.0004 - Montaje / Ejecución - DISTRIBUTION TRANSFORMER, 250 kVA ,
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
PANEL 60.70.004.0002 - Montaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G,
PANEL
PANEL
PANEL
PANEL
PANEL 60.70.004.0003 - Montaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G,
PANEL
PANEL
PANEL
PANEL
PANEL 60.70.004.0004 - Montaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 2P, 125 V
PANEL
PANEL
PANEL
PANEL 03 FEEDER CIRCUIT BREAKER, 630 A
SWITCHGEAR (TAG No.: XXXX-HA-XXX-XX)
SWITCHGEAR
SWITCHGEAR
SWITCHGEAR
SWITCHGEAR 05 FEEDER CIRCUIT BREAKER, 1200 A
SWITCHGEAR (TAG No.: XXXX-HA-XXX-XX)
SWITCHGEAR
SWITCHGEAR
SWITCHGEAR
SWITCHGEAR 01 TIE CIRCUIT BREAKER, 1200 A
MOTOR CONTROL C08 MOTOR STARTER, 400 A
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
MOTOR CONTROL C60.70.006.0005 - Montaje / Ejecución - MOTOR CONTROL CENTER, 480 V, 1200 A,
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
BATERIA 60.70.008.0101 - Montaje / Ejecución - BATTERY CHARGER, 400 V-125 V (dc)
BATERIA
BATERIA
BATERIA
BATERIA
BATERIA 60.70.009.0002 - Montaje / Ejecución - BATTERY BANK, 125 V (dc)
BATERIA
BATERIA
BATERIA
BATERIA 60.70.014.0001 - Montaje / Ejecución - BUSBAR DUCT, 480 V, 3200 A, 65 kA
BUSBAR (TAG No.: XXXX-ED-XXX)
BUSBAR
BUSBAR
BUSBAR
BUSBAR
SALA ELECTRICA 60.70.020.0000
SALA ELECTRICA
26300010007 - I&C Works (No se encuentra en Bill Quantity)
2700 COARSE ORE HANDLING TO STOCKPILE
2730 - Conveyor Belt From Primary Crusher Ore To Stockpile
2730002 - Sacrificial Conveyor To Transfer Tower
27300020000 - Civil Works (No se encuentra en Bill Quantity)
EXCAVACION 00.25.001.0001 - Grounding system excavation
EXCAVACION
EXCAVACION 00.25.001.0002 - Burried Conduit excavation
EXCAVACION
RELLENO 00.30.002.0001 - Grounding system backfill and compaction
RELLENO
RELLENO 00.30.002.0002 - Burried conduit backfill and compaction
RELLENO
27300020001 - Concrete Works
PERNO 10.20.001.0001 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0002 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0101 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0102 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0003 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0004 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0103 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0104 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.002.0001 - Suministro - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
PERNO 10.20.002.0002 - Montaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
ACERO REFUERZO 10.40.001.0005 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0009 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0011 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
CONCRETO 10.40.002.2805 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2809 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2811 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.60.002.1061 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
27300020004 - Mechanical Works
CHUTE DESCARGA F40.70.001.2627 - Montaje / Ejecución - CHUTE DESCARGA FAJA SACRIFICIO ; 1415
CHUTE DESCARGA FAJA SACRIFICIO
CHUTE DESCARGA FAJA SACRIFICIO
CHUTE DESCARGA FAJA SACRIFICIO
CHUTE DESCARGA FAJA SACRIFICIO
FAJA SACRIFICIO 40.80.001.201 - Montaje / Ejecución - CINTA FAJA TRANSPORTADORA DE SACRIFI
FAJA SACRIFICIO FLUJO HUMEDO
FAJA SACRIFICIO FLUJO HUMEDO
FAJA SACRIFICIO FLUJO HUMEDO
FAJA SACRIFICIO FLUJO HUMEDO
FAJA SACRIFICIO FLUJO HUMEDO
FAJA SACRIFICIO FLUJO HUMEDO
GALERIAS FAJA SAC40.80.001.202 - Montaje / Ejecución - SACRIFICE BELT CONVEYOR 2730-CV-001-G
GALERIAS FAJA SACRIFICIO
GALERIAS FAJA SACRIFICIO
GALERIAS FAJA SACRIFICIO
GALERIAS FAJA SACRIFICIO
GALERIAS FAJA SACRIFICIO
GALERIAS FAJA SACRIFICIO
MESA IMPACTO FAJ40.80.001.203 - Montaje / Ejecución - SACRIFICE BELT CONVEYOR 2730-CV-001-IM
MESA IMPACTO FAJA SACRIFICIO
MESA IMPACTO FAJA SACRIFICIO
MESA IMPACTO FAJA SACRIFICIO
MESA IMPACTO FAJA SACRIFICIO
MESA IMPACTO FAJA SACRIFICIO
MESA IMPACTO FAJA SACRIFICIO
MESA DE CARGA FAJ40.80.001.204 - Montaje / Ejecución - SACRIFICE BELT CONVEYOR 2730-CV-001-LO
MESA DE CARGA FAJA SACRIFICIO
MESA DE CARGA FAJA SACRIFICIO
MESA DE CARGA FAJA SACRIFICIO
MESA DE CARGA FAJA SACRIFICIO
MESA DE CARGA FAJA SACRIFICIO
MESA DE CARGA FAJA SACRIFICIO
TAIL ASSEMBLY FAJ40.80.001.205 - Montaje / Ejecución - SACRIFICE BELT CONVEYOR 2730-CV-001-TA
TAIL ASSEMBLY FAJA SACRIFICIO
TAIL ASSEMBLY FAJA SACRIFICIO
TAIL ASSEMBLY FAJA SACRIFICIO
TAIL ASSEMBLY FAJA SACRIFICIO
TAIL ASSEMBLY FAJA SACRIFICIO
TAIL ASSEMBLY FAJA SACRIFICIO
MISCELANEOS TAKE40.80.001.206 - Montaje / Ejecución - SACRIFICE BELT CONVEYOR 2730-CV-001-M
MISCELANEOS TAKE UP FAJA SACRIFICIO
MISCELANEOS TAKE UP FAJA SACRIFICIO
MISCELANEOS TAKE UP FAJA SACRIFICIO
MISCELANEOS TAKE UP FAJA SACRIFICIO
MISCELANEOS TAKE UP FAJA SACRIFICIO
MISCELANEOS TAKE UP FAJA SACRIFICIO
MISCELANEOS COUN 40.80.001.207 - Montaje / Ejecución - SACRIFICE BELT CONVEYOR 2730-CV-001-M
MISCELANEOS COUNTERWEIGHT FAJA SACRIFICIO
MISCELANEOS COUNTERWEIGHT FAJA SACRIFICIO
MISCELANEOS COUNTERWEIGHT FAJA SACRIFICIO
MISCELANEOS COUNTERWEIGHT FAJA SACRIFICIO
MISCELANEOS COUNTERWEIGHT FAJA SACRIFICIO
MISCELANEOS COUNTERWEIGHT FAJA SACRIFICIO
MISCELANEOS FAJA40.80.001.208 - Montaje / Ejecución - SACRIFICE BELT CONVEYOR 2730-CV-001-M
MISCELANEOS FAJA SACRIFICIO
MISCELANEOS FAJA SACRIFICIO
MISCELANEOS FAJA SACRIFICIO
MISCELANEOS FAJA SACRIFICIO
MISCELANEOS FAJA SACRIFICIO
MISCELANEOS FAJA SACRIFICIO
REDUCTOR FAJA DE40.80.001.209 - Montaje / Ejecución - REDUCTOR FAJA DE SACRIFICIO
REDUCTOR FAJA DE SACRIFICIO
REDUCTOR FAJA DE SACRIFICIO
REDUCTOR FAJA DE SACRIFICIO
REDUCTOR FAJA DE SACRIFICIO
REDUCTOR FAJA DE SACRIFICIO
REDUCTOR FAJA DE SACRIFICIO
MOTOR VENTILADOR 40.80.001.210 - Montaje / Ejecución - MOTOR VENTILADOR UNIDAD MOTRIZ FAJ
MOTOR VENTILADOR UNIDAD MOTRIZ FAJA SACRIF
MOTOR VENTILADOR UNIDAD MOTRIZ FAJA SACRIF
MOTOR VENTILADOR UNIDAD MOTRIZ FAJA SACRIF
MOTOR VENTILADOR UNIDAD MOTRIZ FAJA SACRIF
MOTOR VENTILADOR UNIDAD MOTRIZ FAJA SACRIF
MOTOR VENTILADOR UNIDAD MOTRIZ FAJA SACRIF
CALEFACTOR UNIDA40.80.001.211 - Montaje / Ejecución - CALEFACTOR UNIDAD MOTRIZ FAJA TRANS
CALEFACTOR UNIDAD MOTRIS FAJA SACRIFICIO
CALEFACTOR UNIDAD MOTRIS FAJA SACRIFICIO
CALEFACTOR UNIDAD MOTRIS FAJA SACRIFICIO
CALEFACTOR UNIDAD MOTRIS FAJA SACRIFICIO
CALEFACTOR UNIDAD MOTRIS FAJA SACRIFICIO
CALEFACTOR UNIDAD MOTRIS FAJA SACRIFICIO
MOTOR BOMBA UNID 40.80.001.212 - Montaje / Ejecución - MOTOR BOMBA ACEITE UNIDAD MOTRIZ F
MOTOR BOMBA UNIDAD MOTRIZ FAJA SACRIFICIO
MOTOR BOMBA UNIDAD MOTRIZ FAJA SACRIFICIO
MOTOR BOMBA UNIDAD MOTRIZ FAJA SACRIFICIO
MOTOR BOMBA UNIDAD MOTRIZ FAJA SACRIFICIO
MOTOR BOMBA UNIDAD MOTRIZ FAJA SACRIFICIO
MOTOR BOMBA UNIDAD MOTRIZ FAJA SACRIFICIO
DETECTOR METALES 40.80.001.213 - Montaje / Ejecución - DETECTOR DE METALES EN FAJA DE SACRIF
DETECTOR METALES FAJA SACRIFICIO
DETECTOR METALES FAJA SACRIFICIO
DETECTOR METALES FAJA SACRIFICIO
DETECTOR METALES FAJA SACRIFICIO
DETECTOR METALES FAJA SACRIFICIO
DETECTOR METALES FAJA SACRIFICIO
MOTOR ELECTRICO40.80.001.214 - Montaje / Ejecución - MOTOR ELECTRICO FAJA DE SACRIFICIO ; 7
MOTOR ELECTRICO FAJA DE SACRIFICIO
MOTOR ELECTRICO FAJA DE SACRIFICIO
MOTOR ELECTRICO FAJA DE SACRIFICIO
MOTOR ELECTRICO FAJA DE SACRIFICIO
MOTOR ELECTRICO FAJA DE SACRIFICIO
MOTOR ELECTRICO FAJA DE SACRIFICIO
MOTOR CREEP DRIVE 40.80.001.215 - Montaje / Ejecución - MOTOR CREEP DRIVE PARA FAJA TRANSPO
MOTOR CREEP DRIVE FAJA DE SACRIFICIO
MOTOR CREEP DRIVE FAJA DE SACRIFICIO
MOTOR CREEP DRIVE FAJA DE SACRIFICIO
MOTOR CREEP DRIVE FAJA DE SACRIFICIO
MOTOR CREEP DRIVE FAJA DE SACRIFICIO
MOTOR CREEP DRIVE FAJA DE SACRIFICIO
TORRE DE TRANSFE40.80.001.216 - Montaje / Ejecución - TORRE DE TRANSFERENCIA FAJA DE SACRIF
TORRE DE TRANSFERENCIA FAJA DE SACRIFICIO
TORRE DE TRANSFERENCIA FAJA DE SACRIFICIO
TORRE DE TRANSFERENCIA FAJA DE SACRIFICIO
TORRE DE TRANSFERENCIA FAJA DE SACRIFICIO
TORRE DE TRANSFERENCIA FAJA DE SACRIFICIO
TORRE DE TRANSFERENCIA FAJA DE SACRIFICIO
ELECTRIC HOIST CH40.80.001.3204 - Montaje / Ejecución - ELECTRIC HOIST SACRIFICE CONVEYOR SPO
ELECTRIC HOIST CHUTE FAJA SACRIFICIO
ELECTRIC HOIST CHUTE FAJA SACRIFICIO
ELECTRIC HOIST CHUTE FAJA SACRIFICIO
ELECTRIC HOIST CHUTE FAJA SACRIFICIO
27300020005 - Piping Works
FABRICACION DE T 51.20.001.0002 - Fabricate - Handling of pipe PIPE XS SMLS STL A106-B, NPS 1.00"
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.001.0005 - Fabricate - Handling of pipe PIPE XS WELDED STL A53-F GALV T&
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
INSTALACION DE T 51.20.001.0008 - Install / Perform - Handling of pipe PIPE XS SMLS STL A106-B, NP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.001.0011 - Install / Perform - Handling of pipe PIPE XS WELDED STL A53-F G
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0001 - Install / Perform - Handling of 2 LUG UNIVERSAL HOSE COUPLIN
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0007 - Install / Perform - Handling of BA-16: BALL 600# SCRD CS PTFE H
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0014 - Install / Perform - Handling of COUPLING REDUCING 300# SCRD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0023 - Install / Perform - Handling of FLG SCRD 150# RF STL A105, NPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0032 - Install / Perform - Handling of NIPPLE XS STL A106-B TBE 3" LON
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0033 - Install / Perform - Handling of NIPPLE XS STL A106-B TBE 3" LON
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0034 - Install / Perform - Handling of NIPPLE XS STL A106-B TBE 4" LON
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0044 - Install / Perform - Handling of LUG 4 LUG UNIVERSAL HOSE COU
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0046 - Install / Perform - Handling of NIPPLE SCH 40S 316/316L SS PBE
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
FABRICACION DE T 51.30.001.0015 - Fabricate - Socket Weld CS, NPS 1.50", Schedule SCH STD
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0016 - Fabricate - Socket Weld SS, NPS 2.00", Schedule SCH40S
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
INSTALACION DE T 51.40.001.0011 - Install / Perform - RT, NPS 3.00", Schedule SCH40S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0019 - Install / Perform - RT, NPS 3.00", Schedule SCH STD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0020 - Install / Perform - RT, NPS 4.00", Schedule SCH STD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0024 - Install / Perform - RT, NPS 14.00", Schedule SCH STD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0002 - Install / Perform - HYDROSTATIC of PIPE XS SMLS STL A106-B, NP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0005 - Install / Perform - HYDROSTATIC of PIPE XS WELDED STL A53-F G
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0011 - Install / Perform - HYDROSTATIC of PIPE XS SMLS STL A106-B, NP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0024 - Install / Perform - HYDROSTATIC of PIPE SCH 40S SMLS 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0015 - Install / Perform - Double handling of SS 304, NPS 0.75", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0017 - Install / Perform - Double handling of SS 304, NPS 2.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0018 - Install / Perform - Double handling of SS 316, NPS 3.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0019 - Install / Perform - Double handling of SS 316, NPS 6.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0020 - Install / Perform - Double handling of SS 316, NPS 3.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0021 - Install / Perform - Double handling of SS 316, NPS 6.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0002 - Install / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0005 - Install / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0012 - Install / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0025 - Install / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/31
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0019 - Install / Perform - HANDLING of pipe ELL 90 DEG 300# SCRD MI A
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0048 - Install / Perform - HANDLING of pipe TEE RED 2x1 300# SCRD MI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0054 - Install / Perform - HANDLING of pipe BA-10: BALL VALVE 2000 W
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0065 - Install / Perform - HANDLING of pipe ELL 90 DEG 3000# SW 316/
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0068 - Install / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0072 - Install / Perform - HANDLING of pipe FLG BLIND 150# RF 316/31
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0081 - Install / Perform - HANDLING of pipe FLG SW 150# RF 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0083 - Install / Perform - HANDLING of pipe GL-11: GLOBE 800# SW SS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0084 - Install / Perform - HANDLING of pipe NIPPLE SCH 40S 316/316L S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0089 - Install / Perform - HANDLING of pipe SOCKOLET 3X2 3000# 316/
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0095 - Install / Perform - HANDLING of pipe UNION 3000# SW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0015 - Install / Perform - Butt Weld / Slip-on CS, NPS 1.50", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0016 - Install / Perform - Butt Weld / Slip-on SS, NPS 2.00", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0002 - Install / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0005 - Install / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0011 - Install / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0024 - Install / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/31
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
TUBERIAS 52.40.006.0024 - Install / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/31
27300020007 - I&C Works
TRANSMISOR 70.20.001.0001 - Montaje / Ejecución - Interruptor de nivel nuclear
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
INDICADOR 70.20.001.0016 - Montaje / Ejecución - Indicadores de Presión sin/con Sello
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INTERRUPTOR 70.20.001.0020 - Montaje / Ejecución - Interruptores de Presión sin/con Sello
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
SENSOR 70.20.001.0031 - Montaje / Ejecución - Sensor Temperatura
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
TRANSMISOR 70.20.001.0032 - Montaje / Ejecución - Transmisor de Temperatura
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
SIRENA 70.20.001.0038 - Montaje / Ejecución - Sirena (Horn)
SIRENA
SIRENA
SIRENA
SIRENA
SIRENA
BALIZA 70.20.001.0039 - Montaje / Ejecución - Baliza (Beacon)
BALIZA
BALIZA
BALIZA
BALIZA
BALIZA
INTERRUPTOR 70.20.001.0040 - Montaje / Ejecución - Interruptor de Desalineamiento Faja
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.0041 - Montaje / Ejecución - Interruptor de Seguridad tipo Pull Cord
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.0042 - Montaje / Ejecución - Interruptor de Corte de Faja Mecánico
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.0044 - Montaje / Ejecución - Sensor/Transmisor de Velocidad
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
SENSOR 70.20.001.0049 - Montaje / Ejecución - Sensor/Transmisor de Vibración
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
INTERRUPTOR 70.20.001.0050 - Montaje / Ejecución - Interruptor posición contrapeso fajas
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.0052 - Montaje / Ejecución - Interruptor posición carro repartidor
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.00X3 - Montaje / Ejecución - Tipo de radar de interruptor de nivel
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
ANALIZADOR 70.20.003.0001 - Montaje / Ejecución - Cámara Analizador Tamaño de Roca
ANALIZADOR
ANALIZADOR
ANALIZADOR
ANALIZADOR
ANALIZADOR
UNIDAD DE COMUN70.20.003.0002 - Montaje / Ejecución - Unidad de Comunicaciones y alimentación
UNIDAD DE COMUNICACIÓN
UNIDAD DE COMUNICACIÓN
UNIDAD DE COMUNICACIÓN
UNIDAD DE COMUNICACIÓN
UNIDAD DE COMUNICACIÓN
ILUMINACION 70.20.003.0003 - Montaje / Ejecución - Sistema de Iluminación Cámaras Analizado
ILUMINACION
ILUMINACION
ILUMINACION
ILUMINACION
ILUMINACION
TRANSMISOR 70.20.003.0011 - Montaje / Ejecución - Transmisor detector de metales
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
MONTAJE INSTRU 70.20.005.0001 - Montaje / Ejecución - Panel Paquete Mecánico Tipo # 1 (Hasta 4
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
UNIDAD HIDRAULI 70.20.007.0001 - Montaje / Ejecución - Unidad Hidraulica para Actuadores
UNIDAD HIDRAULICA
UNIDAD HIDRAULICA
UNIDAD HIDRAULICA
UNIDAD HIDRAULICA
UNIDAD HIDRAULICA
PLACA DE MONTAJ70.20.008.0005 - Suministro / Instalación - Suministro e Instalación Placa de Mon
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
EXECUTION FRONT 02
2700 COARSE ORE HANDLING TO STOCKPILE
2710A - Coarse Ore Conveyance Tunnel
2710003A - Additional Works In Coarse Ore Conveyor Tunnel
27100030004A - Mechanical Works
COMPRESOR 40.70.001.3009 - Montaje / Ejecución - COMPRESOR AIRE SERVICIO OVERLAND ; 5
COMPRESOR
COMPRESOR
COMPRESOR
COMPRESOR
COMPRESOR
MOTOR ELECTRICO40.70.001.3010 - Montaje / Ejecución - MOTOR ELECTRICO COMPRESOR AIRE SER
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
VENTILACION 40.30.001.5001 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 01 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5005 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 02 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5006 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 03 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5007 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 04 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5008 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 05 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5009 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 06 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5010 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 07 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5011 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 08 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5012 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 09 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5013 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 10 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5014 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 11 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5015 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 12 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5022 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 01 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5023 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 02 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5024 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 03 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5025 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 04 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5026 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 05 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5027 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 06 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5028 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 07 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5029 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 08 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5030 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 09 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5031 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 10 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5032 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 11 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5033 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 12 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
27100030005A - Piping Works
INSTALACION DE T 51.40.001.0009 - Install / Perform - RT, NPS 1.50", Schedule SCH40S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0018 - Install / Perform - RT, NPS 2.00", Schedule SCH80S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0025 - Install / Perform - RT, NPS 0.50", Schedule SCH XS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0023 - Install / Perform - HYDROSTATIC of PIPE SCH 40S EFW 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0001 - Install / Perform - Double handling of CS A106, NPS 0.50", Sched
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0002 - Install / Perform - Double handling of CS A106, NPS 0.75", Sched
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0004 - Install / Perform - Double handling of CS A106, NPS 1.50", Sched
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0005 - Install / Perform - Double handling of CS A106, NPS 2.00", Sched
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0006 - Install / Perform - Double handling of CS A53, NPS 3.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0007 - Install / Perform - Double handling of CS A53, NPS 4.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0013 - Install / Perform - Double handling of SS 304, NPS 6.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0017 - Install / Perform - Double handling of SS 304, NPS 2.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0019 - Install / Perform - Double handling of SS 316, NPS 6.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0020 - Install / Perform - Double handling of SS 316, NPS 3.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0021 - Install / Perform - Double handling of SS 316, NPS 6.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0024 - Install / Perform - HANDLING of pipe PIPE SCH 40S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0055 - Install / Perform - HANDLING of pipe BU-22: BUTTEFLY LUG HP 1
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0059 - Install / Perform - HANDLING of pipe BU-25: BUTTERFLY LUG HP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0068 - Install / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0071 - Install / Perform - HANDLING of pipe ELL 90 LR SCH 40S 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0076 - Install / Perform - HANDLING of pipe FLG SO 150# RF 316/316L S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0082 - Install / Perform - HANDLING of pipe FLG WN 300# RF 316 SS 40
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0023 - Install / Perform - HANDLING of pipe PIPE SCH 40S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
27100030006A - Electrical Works
CONDUIT 60.20.002.0002 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0005 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0032 - Montaje / Ejecución - Conduit a la vista, acero flexible y cubierta
CONDUIT
CONDUIT
CONDUIT
CABLE 60.30.002.6312 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6314 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6315 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.7021 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7022 - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 1
CABLE
CABLE
CABLE
CABLE 60.30.002.7221 - Montaje / Ejecución - Par apantallado, conductor de cobre, Clas
CABLE
CABLE
CABLE
CABLE 60.30.002.7331 - Montaje / Ejecución - Cable de Instrumentación 1x1t;# 18 AWG
CABLE
CABLE
CABLE
CABLE 60.30.002.8101 - Montaje / Ejecución - Cable Profibus PA 1x1p;# 18 AWG, Tipo A
CABLE
CABLE
CABLE
CABLE 60.30.002.8102 - Montaje / Ejecución - Cable Profibus DP 1x1p;# 22 AWG Tipo A
CABLE
CABLE
CABLE
CABLE 60.30.002.9113 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
CABLE 60.30.002.9114 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
CABLE 60.30.003.0001 - Montaje / Ejecución - Messenger cable with hardware for 22.9kV
CABLE
CABLE
CABLE
PUESTA A TIERRA 60.40.001.0001 - Montaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.001.0002 - Montaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0001 - Montaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0002 - Montaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0003 - Montaje / Ejecución - Monoconductor de fuerza, cobre, aislado,
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.005.0001 - Montaje / Ejecución - Conexionado Cable de Aterrizamiento 1x1
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
CABLE 60.50.001.1405 - Montaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 4/0, 2
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6306 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6315 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7021 - Montaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI C
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7334 - Montaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI T
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7338 - Montaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI T
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.9113 - Montaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.9114 - Montaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE
CABLE
CABLE
CABLE
CABLE
LUMINARIA 60.60.005.0081 - Montaje / Ejecución - Luminaria fluorescente industrial hermétic
LUMINARIA
LUMINARIA
LUMINARIA
LUMINARIA 60.60.005.0092 - Montaje / Ejecución - Equipo de alumbrado de emergencia, mon
LUMINARIA
LUMINARIA
LUMINARIA
TRANSFORMADOR 60.70.001.0006 - Montaje / Ejecución - DISTRIBUTION TRANSFORMER, 500 kVA, 2
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
MOTOR CONTROL C60.70.006.0006 - Montaje / Ejecución - MOTOR CONTROL CENTER, 480 V, 1200 A,
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
27100030007A - I&C Works
PLACA DE MONTAJ70.20.008.0005 - Suministro / Instalación - Suministro e Instalación Placa de Mon
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
CAMARA CCTV 70.20.008.0009 - Suministro / Instalación - Soporte de Instalación cámaras CCTV T
CAMARA CCTV
CAMARA CCTV
CAMARA CCTV
CAMARA CCTV
CAMARA CCTV
MONTAJE INSTRU 70.40.002.0002 - Montaje / Ejecución - Caja de Terreno MONITOREO DE CONDICIO
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.40.002.0005 - Montaje / Ejecución - Rack Remoto (IO Block Terreno)
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.50.001.0005 - Montaje / Ejecución - Gabinetes Comunicaciones en Terreno
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.60.001.0002 - Montaje / Ejecución - Cámaras CCTV OUTDOOR
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.60.001.0003 - Montaje / Ejecución - Gabinete CCTV Outdoor (Power & Signal)
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
2710005A - Portal Entry Platform Seccion
27100050000A - Civil Works
EXCAVACION 00.20.003.0001 - Montaje / Ejecución - Excavación de Escarpe
EXCAVACION
EXCAVACION 00.20.004.0003 - Montaje / Ejecución - Revestimiento de Fondo con Mampostería
EXCAVACION
EXCAVACION 00.25.001.0001 - Montaje / Ejecución - Grounding system excavation
EXCAVACION
EXCAVACION 00.25.002.0001 - Montaje / Ejecución - Excavación de Canales y Zanjas de Drenaje
EXCAVACION
EXCAVACION 00.25.004.0001 - Montaje / Ejecución - Excavación Masiva en Terreno Común
EXCAVACION
EXCAVACION 00.25.007.0001 - Montaje / Ejecución - Excavación Masiva con Ripper
EXCAVACION
EXCAVACION 00.25.007.0002 - Montaje / Ejecución - Excavación Masiva en Roca
EXCAVACION
RELLENO 00.30.002.0001 - Montaje / Ejecución - Excavación de Canales y Zanjas de Drenaje
RELLENO
PERFILADO 00.30.007.0001 - Montaje / Ejecución - Preparación de Subrasante
PERFILADO
BERMA 00.40.007.0002 - Montaje / Ejecución - Pretil de seguridad h=0,8m
BERMA
2710B - Coarse Ore Conveyance Tunnel
2710003B - Additional Works In Coarse Ore Conveyor Tunnel
27100030004B - Mechanical Works
COMPRESOR 40.70.001.3009 - Montaje / Ejecución - COMPRESOR AIRE SERVICIO OVERLAND ; 5
COMPRESOR
COMPRESOR
COMPRESOR
COMPRESOR
COMPRESOR
MOTOR ELECTRICO40.70.001.3010 - Montaje / Ejecución - MOTOR ELECTRICO COMPRESOR AIRE SER
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
VENTILACION 40.30.001.5001 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 01 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5005 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 02 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5006 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 03 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5007 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 04 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5008 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 05 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5009 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 06 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5010 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 07 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5011 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 08 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5012 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 09 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5013 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 10 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5014 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 11 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5015 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 12 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5022 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 01 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5023 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 02 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5024 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 03 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5025 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 04 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5026 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 05 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5027 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 06 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5028 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 07 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5029 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 08 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5030 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 09 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5031 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 10 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5032 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 11 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5033 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 12 AX
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
27100030005B - Piping Works
INSTALACION DE T 51.40.001.0009 - Install / Perform - RT, NPS 1.50", Schedule SCH40S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0018 - Install / Perform - RT, NPS 2.00", Schedule SCH80S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0025 - Install / Perform - RT, NPS 0.50", Schedule SCH XS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0023 - Install / Perform - HYDROSTATIC of PIPE SCH 40S EFW 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0001 - Install / Perform - Double handling of CS A106, NPS 0.50", Sched
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0002 - Install / Perform - Double handling of CS A106, NPS 0.75", Sched
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0004 - Install / Perform - Double handling of CS A106, NPS 1.50", Sched
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0005 - Install / Perform - Double handling of CS A106, NPS 2.00", Sched
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0006 - Install / Perform - Double handling of CS A53, NPS 3.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0007 - Install / Perform - Double handling of CS A53, NPS 4.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0013 - Install / Perform - Double handling of SS 304, NPS 6.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0017 - Install / Perform - Double handling of SS 304, NPS 2.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0019 - Install / Perform - Double handling of SS 316, NPS 6.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0020 - Install / Perform - Double handling of SS 316, NPS 3.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0021 - Install / Perform - Double handling of SS 316, NPS 6.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0024 - Install / Perform - HANDLING of pipe PIPE SCH 40S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0055 - Install / Perform - HANDLING of pipe BU-22: BUTTEFLY LUG HP 1
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0059 - Install / Perform - HANDLING of pipe BU-25: BUTTERFLY LUG HP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0068 - Install / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0071 - Install / Perform - HANDLING of pipe ELL 90 LR SCH 40S 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0076 - Install / Perform - HANDLING of pipe FLG SO 150# RF 316/316L S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0082 - Install / Perform - HANDLING of pipe FLG WN 300# RF 316 SS 40
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0023 - Install / Perform - HANDLING of pipe PIPE SCH 40S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
27100030006B - Electrical Works
CONDUIT 60.20.002.0002 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0005 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0032 - Montaje / Ejecución - Conduit a la vista, acero flexible y cubierta
CONDUIT
CONDUIT
CONDUIT
CABLE 60.30.002.6312 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6314 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6315 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.7021 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7022 - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 1
CABLE
CABLE
CABLE
CABLE 60.30.002.7221 - Montaje / Ejecución - Par apantallado, conductor de cobre, Clas
CABLE
CABLE
CABLE
CABLE 60.30.002.7331 - Montaje / Ejecución - Cable de Instrumentación 1x1t;# 18 AWG
CABLE
CABLE
CABLE
CABLE 60.30.002.8101 - Montaje / Ejecución - Cable Profibus PA 1x1p;# 18 AWG, Tipo A
CABLE
CABLE
CABLE
CABLE 60.30.002.8102 - Montaje / Ejecución - Cable Profibus DP 1x1p;# 22 AWG Tipo A
CABLE
CABLE
CABLE
CABLE 60.30.002.9113 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
CABLE 60.30.002.9114 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
CABLE 60.30.003.0001 - Montaje / Ejecución - Messenger cable with hardware for 22.9kV
CABLE
CABLE
CABLE
PUESTA A TIERRA 60.40.001.0001 - Montaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.001.0002 - Montaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0001 - Montaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0002 - Montaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0003 - Montaje / Ejecución - Monoconductor de fuerza, cobre, aislado,
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.005.0001 - Montaje / Ejecución - Conexionado Cable de Aterrizamiento 1x1
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
CABLE 60.50.001.1405 - Montaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 4/0, 2
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6306 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6315 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7021 - Montaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI C
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7334 - Montaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI T
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7338 - Montaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI T
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.9113 - Montaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.9114 - Montaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE
CABLE
CABLE
CABLE
CABLE
LUMINARIA 60.60.005.0081 - Montaje / Ejecución - Luminaria fluorescente industrial hermétic
LUMINARIA
LUMINARIA
LUMINARIA
LUMINARIA 60.60.005.0092 - Montaje / Ejecución - Equipo de alumbrado de emergencia, mon
LUMINARIA
LUMINARIA
LUMINARIA
TRANSFORMADOR 60.70.001.0006 - Montaje / Ejecución - DISTRIBUTION TRANSFORMER, 500 kVA, 2
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
MOTOR CONTROL C60.70.006.0006 - Montaje / Ejecución - MOTOR CONTROL CENTER, 480 V, 1200 A,
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
27100030007B - I&C Works
PLACA DE MONTAJ70.20.008.0005 - Suministro / Instalación - Suministro e Instalación Placa de Mon
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
CAMARA CCTV 70.20.008.0009 - Suministro / Instalación - Soporte de Instalación cámaras CCTV T
CAMARA CCTV
CAMARA CCTV
CAMARA CCTV
CAMARA CCTV
CAMARA CCTV
MONTAJE INSTRU 70.40.002.0002 - Montaje / Ejecución - Caja de Terreno MONITOREO DE CONDICIO
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.40.002.0005 - Montaje / Ejecución - Rack Remoto (IO Block Terreno)
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.50.001.0005 - Montaje / Ejecución - Gabinetes Comunicaciones en Terreno
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.60.001.0002 - Montaje / Ejecución - Cámaras CCTV OUTDOOR
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.60.001.0003 - Montaje / Ejecución - Gabinete CCTV Outdoor (Power & Signal)
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
2710005B - Portal Entry Platform Seccion
27100050000B - Civil Works
EXCAVACION 00.20.003.0001 - Montaje / Ejecución - Excavación de Escarpe
EXCAVACION
EXCAVACION 00.20.004.0003 - Montaje / Ejecución - Revestimiento de Fondo con Mampostería
EXCAVACION
EXCAVACION 00.25.001.0001 - Montaje / Ejecución - Grounding system excavation
EXCAVACION
EXCAVACION 00.25.002.0001 - Montaje / Ejecución - Excavación de Canales y Zanjas de Drenaje
EXCAVACION
EXCAVACION 00.25.004.0001 - Montaje / Ejecución - Excavación Masiva en Terreno Común
EXCAVACION
EXCAVACION 00.25.007.0001 - Montaje / Ejecución - Excavación Masiva con Ripper
EXCAVACION
EXCAVACION 00.25.007.0002 - Montaje / Ejecución - Excavación Masiva en Roca
EXCAVACION
RELLENO 00.30.002.0001 - Montaje / Ejecución - Excavación de Canales y Zanjas de Drenaje
RELLENO
PERFILADO 00.30.007.0001 - Montaje / Ejecución - Preparación de Subrasante
PERFILADO
BERMA 00.40.007.0002 - Montaje / Ejecución - Pretil de seguridad h=0,8m
BERMA
2730A - Conveyor Belt From Primary Crusher Ore To Stockpile (Compartido con Frente 03)
2730001A - Overland Conveyor Belt To Ore Stockpile
27300010001A - Concrete Works
PERNO 10.20.001.0001 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0002 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0101 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0102 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0003 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0004 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0103 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0104 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0008 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0108 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0012 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0112 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.002.0001 - Suministro - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
PERNO 10.20.002.0002 - Montaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
ACERO REFUERZO 10.40.001.0005 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0006 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0009 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0010 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0011 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0027 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
CONCRETO 10.40.002.2805 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2806 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2809 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2810 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2811 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.3527 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.60.002.1061 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
27300010002A - Steel Works
ESTRUCTURA ACER20.10.001.0003 - Montaje / Ejecución - Acero Estructural Liviano (<= 30 kg/m)
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0103 - Montaje / Ejecución - Acero Estructural Mediano (> 30 kg/m y <=
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0203 - Montaje / Ejecución - Acero Estructural Pesado (> 60 kg/m y <=
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0303 - Montaje / Ejecución - Acero Estructural Extra Pesado (> 90 kg/m
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0403 - Montaje / Ejecución - Acero Estructural Doble Extra Pesado (> 15
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0503 - Montaje / Ejecución - Acero Estructural Triple Extra Pesado (> 30
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO 20.10.005.0003 - Montaje / Ejecución - Rejilla de Piso - Acero Carbono 32mm x 5m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.006.0003 - Montaje / Ejecución - Baranda de acero con Guardapies
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0003 - Montaje / Ejecución - Estructura Ensamblada Liviana (<= 30 kg/m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0103 - Montaje / Ejecución - Estructura Ensamblada Mediana (> 30 kg/
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0203 - Montaje / Ejecución - Estructura Ensamblada Pesada (> 60 kg/m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
27300010003A - Architectual Works
REVESTIMIENTO 30.10.001.2001 - Montaje / Ejecución - Revestimiento de Techo Plancha sin Aislac
REVESTIMIENTO
REVESTIMIENTO
REVESTIMIENTO
REVESTIMIENTO 30.10.002.2001 - Montaje / Ejecución - Revestimiento Lateral Plancha sin Aislació
REVESTIMIENTO
REVESTIMIENTO
REVESTIMIENTO
27300010004A - Mechanical Works
CHUTE ALIMENTACI40.70.001.2631 - Montaje / Ejecución - CHUTE ALIMENTACION FAJA OVERLAND ;
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
VENTILACION 40.30.001.5016 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VEN
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5017 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VEN
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5018 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VEN
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
BOMBA 40.60.001.1707 - Montaje / Ejecución - BOMBA BOOSTER AGUA FRESCA SISTEMA
BOMBA
BOMBA
BOMBA
BOMBA
MOTOR ELECTRICO40.60.001.1708 - Montaje / Ejecución - MOTOR ELECTRICO BOMBA BOOSTER AGU
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
SUPRESOR DE POL 40.70.001.3801 - Montaje / Ejecución - SISTEMA SUPRESOR DE POLVO DESCARGA
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POL 40.70.001.3802 - Montaje / Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POL 40.70.001.3803 - Montaje / Ejecución - SISTEMA SUPRESOR DE POLVO 3, DESCAR
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POL 40.70.001.3804 - Montaje / Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
FAJA TRANSPORTA 40.80.001.218 - Montaje / Ejecución - CINTA FAJA TRANSPORTADORA OVERLAND
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
MESAS DE IMPACT 40.80.001.252 - Montaje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-IMPAC
MESAS DE IMPACTO
MESAS DE IMPACTO
MESAS DE IMPACTO
MESAS DE IMPACTO
MESAS DE IMPACTO
MESAS DE IMPACTO
MESAS CARGA 40.80.001.253 - Montaje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-LOAD
MESAS CARGA
MESAS CARGA
MESAS CARGA
MESAS CARGA
MESAS CARGA
MESAS CARGA
POLEA DE COLA 40.80.001.255 - Montaje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-TAIL F
POLEA DE COLA
POLEA DE COLA
POLEA DE COLA
POLEA DE COLA
POLEA DE COLA
POLEA DE COLA
MOTOR ELECTRICO40.80.001.258 - Montaje / Ejecución - MOTOR ELECTRICO GEARLESS 1 FAJA OVER
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO40.80.001.259 - Montaje / Ejecución - MOTOR ELECTRICO GEARLESS 2 FAJA OVER
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
BALANZA FAJA 40.80.001.260 - Montaje / Ejecución - BALANZA FAJA OVERLAND ; 0,5kW
BALANZA FAJA
BALANZA FAJA
BALANZA FAJA
BALANZA FAJA
BALANZA FAJA
BALANZA FAJA
FRENO POLEA MOTR
40.80.001.263 - Montaje / Ejecución - FRENO HIDRAULICO POLEA MOTRIZ 1 FAJA
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
MOTOR BOMBA POL40.80.001.264 - Montaje / Ejecución - MOTOR DE BOMBA FRENO HIDRAULICO PO
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
FRENO POLEA MOTR
40.80.001.265 - Montaje / Ejecución - FRENO HIDRAULICO POLEA MOTRIZ 2 FAJA
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
MOTOR BOMBA POL40.80.001.266 - Montaje / Ejecución - MOTOR DE BOMBA FRENO HIDRAULICO PO
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
FRENO CABESTRAN40.80.001.267 - Montaje / Ejecución - FRENO CABRESTANTE PARA FAJA TRANSPO
FRENO CABESTRANTE
FRENO CABESTRANTE
FRENO CABESTRANTE
FRENO CABESTRANTE
FRENO CABESTRANTE
FRENO CABESTRANTE
BOMBA 1 ENFRIAM40.80.001.270 - Montaje / Ejecución - MOTOR BOMBA 1 SISTEMA DE ENFRIAMIEN
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAM40.80.001.271 - Montaje / Ejecución - MOTOR BOMBA 2 SISTEMA DE ENFRIAMIEN
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
UNIDAD DE ENFRIA40.80.001.272 - Montaje / Ejecución - UNIDAD DE ENFRIAMIENTO 1 SISTEMA DE E
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIA40.80.001.273 - Montaje / Ejecución - UNIDAD DE ENFRIAMIENTO 2 SISTEMA DE E
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIA40.80.001.274 - Montaje / Ejecución - UNIDAD DE ENFRIAMIENTO 2 SISTEMA DE E
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
PANEL DE CONTROL40.80.001.275 - Montaje / Ejecución - OVERLAND CONVEYOR MOTOR WATER CO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
IDLER GUARDING 40.80.001.276 - Montaje / Ejecución - OVERLAND CONVEYOR IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
POLIPLASTO MANTE40.80.001.3201 - Montaje / Ejecución - POLIPASTO ELECTRICO MANTENCION FAJA
POLIPLASTO MANTENCION FAJAS
POLIPLASTO MANTENCION FAJAS
POLIPLASTO MANTENCION FAJAS
POLIPLASTO MANTENCION FAJAS
POLIPLASTO MANTE40.80.001.3206 - Montaje / Ejecución - POLIPASTO ELECTRICO MANTENCION FAJA
POLIPLASTO MANTENCION FAJAS
POLIPLASTO MANTENCION FAJAS
POLIPLASTO MANTENCION FAJAS
POLIPLASTO MANTENCION FAJAS
27300010005A - Piping Works
FABRICACION DE T 51.20.001.0006 - Fabricate - Handling of pipe PIPE SCH 40S SMLS 316/316L SS A31
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
INSTALACION DE T 51.20.001.0012 - Install / Perform - Handling of pipe PIPE SCH 40S SMLS 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0045 - Install / Perform - Handling of CAP 3000# SW 316/316L SS, NPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
FABRICACION DE T 51.30.001.0016 - Fabricate - Socket Weld SS, NPS 2.00", Schedule SCH40S
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
INSTALACION DE T 51.40.001.0003 - Install / Perform - RT, NPS 6.00", Schedule SCH10S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0010 - Install / Perform - RT, NPS 2.00", Schedule SCH40S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0015 - Install / Perform - RT, NPS 0.50", Schedule SCH80S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0024 - Install / Perform - RT, NPS 14.00", Schedule SCH STD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0025 - Install / Perform - RT, NPS 0.50", Schedule SCH XS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0026 - Install / Perform - RT, NPS 0.75", Schedule SCH XS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0011 - Install / Perform - HYDROSTATIC of PIPE XS SMLS STL A106-B, NP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0014 - Install / Perform - HYDROSTATIC of PIPE SCH 40S SMLS 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0024 - Install / Perform - HYDROSTATIC of PIPE SCH 40S SMLS 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0003 - Install / Perform - Double handling of CS A106, NPS 1.00", Sched
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0004 - Install / Perform - Double handling of CS A106, NPS 1.50", Sched
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0019 - Install / Perform - Double handling of SS 316, NPS 6.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0021 - Install / Perform - Double handling of SS 316, NPS 6.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0012 - Install / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0015 - Install / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/31
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0025 - Install / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/31
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0002 - Install / Perform - HANDLING of pipe BA-16: BALL 600# SCRD CS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0019 - Install / Perform - HANDLING of pipe ELL 90 DEG 300# SCRD MI A
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0061 - Install / Perform - HANDLING of pipe COUPLING RED 300# SW 31
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0064 - Install / Perform - HANDLING of pipe ELL 45 SCH 10S 316/316L S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0065 - Install / Perform - HANDLING of pipe ELL 90 DEG 3000# SW 316/
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0068 - Install / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0081 - Install / Perform - HANDLING of pipe FLG SW 150# RF 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0011 - Install / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0014 - Install / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/31
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0024 - Install / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/31
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
27300010007A - I&C Works
PESOMETRO 70.20.001.0003 - Montaje / Ejecución - Pesómetro de Faja
PESOMETRO
PESOMETRO
PESOMETRO
PESOMETRO
PESOMETRO
INTERRUPTOR 70.20.001.0015 - Montaje / Ejecución - Interruptor de Flujo Tipo Térmico
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INDICADOR 70.20.001.0016 - Montaje / Ejecución - Indicadores de Presión sin/con Sello
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INTERRUPTOR 70.20.001.0020 - Montaje / Ejecución - Interruptores de Presión sin/con Sello
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
SENSOR 70.20.001.0031 - Montaje / Ejecución - Sensor Temperatura
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
TRANSMISOR 70.20.001.0032 - Montaje / Ejecución - Transmisor de Temperatura
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
SIRENA 70.20.001.0038 - Montaje / Ejecución - Sirena (Horn)
SIRENA
SIRENA
SIRENA
SIRENA
SIRENA
BALIZA 70.20.001.0039 - Montaje / Ejecución - Baliza (Beacon)
BALIZA
BALIZA
BALIZA
BALIZA
BALIZA
INTERRUPTOR 70.20.001.0040 - Montaje / Ejecución - Interruptor de Desalineamiento Faja
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.0041 - Montaje / Ejecución - Interruptor de Seguridad tipo Pull Cord
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.0042 - Montaje / Ejecución - Interruptor de Corte de Faja Mecánico
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
SENSOR 70.20.001.0044 - Montaje / Ejecución - Sensor/Transmisor de Velocidad
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
DETECCION DE RU 70.20.001.0048 - Montaje / Ejecución - Sistema de Detección de Ruptura de Fajas
DETECCION DE RUPTURA
DETECCION DE RUPTURA
DETECCION DE RUPTURA
DETECCION DE RUPTURA
DETECCION DE RUPTURA
SENSOR 70.20.001.0049 - Montaje / Ejecución - Sensor/Transmisor de Vibración
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
INTERRUPTOR 70.20.001.0050 - Montaje / Ejecución - Interruptor posición contrapeso fajas
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.0052 - Montaje / Ejecución - Interruptor posición carro repartidor
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
SENSOR 70.20.001.0053 - Montaje / Ejecución - Sensor transmision de posicion
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
INTERRUPTOR 70.20.001.00X2 - Montaje / Ejecución - Interruptor de posición cerrado / abierto
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.00X3 - Montaje / Ejecución - Tipo de radar de interruptor de nivel
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
PANEL 70.20.005.0001 - Montaje / Ejecución - Panel Paquete Mecánico Tipo # 1 (Hasta 4
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL 70.20.005.0002 - Montaje / Ejecución - Panel Paquete Mecánico Tipo # 2 (Entre 41
PANEL
PANEL
PANEL
PANEL
PANEL
PLACA DE MONTAJ70.20.008.0005 - Suministro / Instalación - Suministro e Instalación Placa de Mon
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
MONTAJE INSTRU 70.40.002.0002 - Montaje / Ejecución - Caja de Terreno MONITOREO DE CONDICIO
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.40.002.0005 - Montaje / Ejecución - Rack Remoto (IO Block Terreno)
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.60.001.0002 - Montaje / Ejecución - Cámaras CCTV OUTDOOR
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.60.001.0003 - Montaje / Ejecución - Gabinete CCTV Outdoor (Power & Signal)
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
2730B - Conveyor Belt From Primary Crusher Ore To Stockpile (Compartido con Frente 03)
2730001B - Overland Conveyor Belt To Ore Stockpile
27300010001B - Concrete Works
PERNO 10.20.001.0001 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0002 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0101 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0102 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0003 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0004 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0103 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0104 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0008 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0108 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0012 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0112 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.002.0001 - Suministro - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
PERNO 10.20.002.0002 - Montaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
ACERO REFUERZO 10.40.001.0005 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0006 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0009 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0010 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0011 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0027 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
CONCRETO 10.40.002.2805 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2806 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2809 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2810 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2811 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.3527 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.60.002.1061 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
27300010002B - Steel Works
ESTRUCTURA ACER20.10.001.0003 - Montaje / Ejecución - Acero Estructural Liviano (<= 30 kg/m)
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0103 - Montaje / Ejecución - Acero Estructural Mediano (> 30 kg/m y <=
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0203 - Montaje / Ejecución - Acero Estructural Pesado (> 60 kg/m y <=
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0303 - Montaje / Ejecución - Acero Estructural Extra Pesado (> 90 kg/m
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0403 - Montaje / Ejecución - Acero Estructural Doble Extra Pesado (> 15
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0503 - Montaje / Ejecución - Acero Estructural Triple Extra Pesado (> 30
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO 20.10.005.0003 - Montaje / Ejecución - Rejilla de Piso - Acero Carbono 32mm x 5m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.006.0003 - Montaje / Ejecución - Baranda de acero con Guardapies
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0003 - Montaje / Ejecución - Estructura Ensamblada Liviana (<= 30 kg/m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0103 - Montaje / Ejecución - Estructura Ensamblada Mediana (> 30 kg/
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0203 - Montaje / Ejecución - Estructura Ensamblada Pesada (> 60 kg/m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
27300010003B - Architectual Works
REVESTIMIENTO 30.10.001.2001 - Montaje / Ejecución - Revestimiento de Techo Plancha sin Aislac
REVESTIMIENTO
REVESTIMIENTO
REVESTIMIENTO
REVESTIMIENTO 30.10.002.2001 - Montaje / Ejecución - Revestimiento Lateral Plancha sin Aislació
REVESTIMIENTO
REVESTIMIENTO
REVESTIMIENTO
27300010004B - Mechanical Works
VENTILACION 40.30.001.5016 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VEN
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5017 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VEN
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5018 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VEN
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
BOMBA 40.60.001.1707 - Montaje / Ejecución - BOMBA BOOSTER AGUA FRESCA SISTEMA
BOMBA
BOMBA
BOMBA
BOMBA
MOTOR ELECTRICO40.60.001.1708 - Montaje / Ejecución - MOTOR ELECTRICO BOMBA BOOSTER AGU
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
SUPRESOR DE POL 40.70.001.3801 - Montaje / Ejecución - SISTEMA SUPRESOR DE POLVO DESCARGA
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POL 40.70.001.3802 - Montaje / Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POL 40.70.001.3803 - Montaje / Ejecución - SISTEMA SUPRESOR DE POLVO 3, DESCAR
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POL 40.70.001.3804 - Montaje / Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
FAJA TRANSPORTA 40.80.001.218 - Montaje / Ejecución - CINTA FAJA TRANSPORTADORA OVERLAND
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
MESAS CARGA 40.80.001.253 - Montaje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-LOAD
MESAS CARGA
MESAS CARGA
MESAS CARGA
MESAS CARGA
MESAS CARGA
MESAS CARGA
POLEA DE COLA 40.80.001.255 - Montaje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-TAIL F
POLEA DE COLA
POLEA DE COLA
POLEA DE COLA
POLEA DE COLA
POLEA DE COLA
POLEA DE COLA
MOTOR ELECTRICO40.80.001.258 - Montaje / Ejecución - MOTOR ELECTRICO GEARLESS 1 FAJA OVER
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO40.80.001.259 - Montaje / Ejecución - MOTOR ELECTRICO GEARLESS 2 FAJA OVER
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
BALANZA FAJA 40.80.001.260 - Montaje / Ejecución - BALANZA FAJA OVERLAND ; 0,5kW
BALANZA FAJA
BALANZA FAJA
BALANZA FAJA
BALANZA FAJA
BALANZA FAJA
BALANZA FAJA
FRENO POLEA MOTR
40.80.001.263 - Montaje / Ejecución - FRENO HIDRAULICO POLEA MOTRIZ 1 FAJA
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
MOTOR BOMBA POL40.80.001.264 - Montaje / Ejecución - MOTOR DE BOMBA FRENO HIDRAULICO PO
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
FRENO POLEA MOTR
40.80.001.265 - Montaje / Ejecución - FRENO HIDRAULICO POLEA MOTRIZ 2 FAJA
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
MOTOR BOMBA POL40.80.001.266 - Montaje / Ejecución - MOTOR DE BOMBA FRENO HIDRAULICO PO
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
FRENO CABESTRAN40.80.001.267 - Montaje / Ejecución - FRENO CABRESTANTE PARA FAJA TRANSPO
FRENO CABESTRANTE
FRENO CABESTRANTE
FRENO CABESTRANTE
FRENO CABESTRANTE
FRENO CABESTRANTE
FRENO CABESTRANTE
BOMBA 1 ENFRIAM40.80.001.270 - Montaje / Ejecución - MOTOR BOMBA 1 SISTEMA DE ENFRIAMIEN
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAM40.80.001.271 - Montaje / Ejecución - MOTOR BOMBA 2 SISTEMA DE ENFRIAMIEN
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
UNIDAD DE ENFRIA40.80.001.272 - Montaje / Ejecución - UNIDAD DE ENFRIAMIENTO 1 SISTEMA DE E
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIA40.80.001.273 - Montaje / Ejecución - UNIDAD DE ENFRIAMIENTO 2 SISTEMA DE E
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIA40.80.001.274 - Montaje / Ejecución - UNIDAD DE ENFRIAMIENTO 2 SISTEMA DE E
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
PANEL DE CONTROL40.80.001.275 - Montaje / Ejecución - OVERLAND CONVEYOR MOTOR WATER CO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
IDLER GUARDING 40.80.001.276 - Montaje / Ejecución - OVERLAND CONVEYOR IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
27300010007B - I&C Works
PESOMETRO 70.20.001.0003 - Montaje / Ejecución - Pesómetro de Faja
PESOMETRO
PESOMETRO
PESOMETRO
PESOMETRO
PESOMETRO
INTERRUPTOR 70.20.001.0015 - Montaje / Ejecución - Interruptor de Flujo Tipo Térmico
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INDICADOR 70.20.001.0016 - Montaje / Ejecución - Indicadores de Presión sin/con Sello
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INTERRUPTOR 70.20.001.0020 - Montaje / Ejecución - Interruptores de Presión sin/con Sello
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
SENSOR 70.20.001.0031 - Montaje / Ejecución - Sensor Temperatura
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
TRANSMISOR 70.20.001.0032 - Montaje / Ejecución - Transmisor de Temperatura
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
SIRENA 70.20.001.0038 - Montaje / Ejecución - Sirena (Horn)
SIRENA
SIRENA
SIRENA
SIRENA
SIRENA
BALIZA 70.20.001.0039 - Montaje / Ejecución - Baliza (Beacon)
BALIZA
BALIZA
BALIZA
BALIZA
BALIZA
INTERRUPTOR 70.20.001.0040 - Montaje / Ejecución - Interruptor de Desalineamiento Faja
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.0041 - Montaje / Ejecución - Interruptor de Seguridad tipo Pull Cord
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.0042 - Montaje / Ejecución - Interruptor de Corte de Faja Mecánico
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
SENSOR 70.20.001.0044 - Montaje / Ejecución - Sensor/Transmisor de Velocidad
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
DETECCION DE RU 70.20.001.0048 - Montaje / Ejecución - Sistema de Detección de Ruptura de Fajas
DETECCION DE RUPTURA
DETECCION DE RUPTURA
DETECCION DE RUPTURA
DETECCION DE RUPTURA
DETECCION DE RUPTURA
SENSOR 70.20.001.0049 - Montaje / Ejecución - Sensor/Transmisor de Vibración
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
INTERRUPTOR 70.20.001.0050 - Montaje / Ejecución - Interruptor posición contrapeso fajas
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.0052 - Montaje / Ejecución - Interruptor posición carro repartidor
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
SENSOR 70.20.001.0053 - Montaje / Ejecución - Sensor transmision de posicion
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
INTERRUPTOR 70.20.001.00X2 - Montaje / Ejecución - Interruptor de posición cerrado / abierto
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.00X3 - Montaje / Ejecución - Tipo de radar de interruptor de nivel
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
PANEL 70.20.005.0001 - Montaje / Ejecución - Panel Paquete Mecánico Tipo # 1 (Hasta 4
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL 70.20.005.0002 - Montaje / Ejecución - Panel Paquete Mecánico Tipo # 2 (Entre 41
PANEL
PANEL
PANEL
PANEL
PANEL
PLACA DE MONTAJ70.20.008.0005 - Suministro / Instalación - Suministro e Instalación Placa de Mon
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
MONTAJE INSTRU 70.40.002.0002 - Montaje / Ejecución - Caja de Terreno MONITOREO DE CONDICIO
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.40.002.0005 - Montaje / Ejecución - Rack Remoto (IO Block Terreno)
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.60.001.0002 - Montaje / Ejecución - Cámaras CCTV OUTDOOR
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.60.001.0003 - Montaje / Ejecución - Gabinete CCTV Outdoor (Power & Signal)
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
2730C - Conveyor Belt From Primary Crusher Ore To Stockpile (Compartido con Frente 03)
2730001C - Overland Conveyor Belt To Ore Stockpile
27300010001C - Concrete Works
PERNO 10.20.001.0001 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0002 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0101 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0102 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0003 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0004 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0103 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0104 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0008 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0108 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0012 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0112 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.002.0001 - Suministro - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
PERNO 10.20.002.0002 - Montaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
ACERO REFUERZO 10.40.001.0005 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0006 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0009 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0010 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0011 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0027 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
CONCRETO 10.40.002.2805 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2806 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2809 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2810 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2811 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.3527 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.60.002.1061 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
27300010002C - Steel Works
ESTRUCTURA ACER20.10.001.0003 - Montaje / Ejecución - Acero Estructural Liviano (<= 30 kg/m)
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0103 - Montaje / Ejecución - Acero Estructural Mediano (> 30 kg/m y <=
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0203 - Montaje / Ejecución - Acero Estructural Pesado (> 60 kg/m y <=
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0303 - Montaje / Ejecución - Acero Estructural Extra Pesado (> 90 kg/m
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0403 - Montaje / Ejecución - Acero Estructural Doble Extra Pesado (> 15
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0503 - Montaje / Ejecución - Acero Estructural Triple Extra Pesado (> 30
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO 20.10.005.0003 - Montaje / Ejecución - Rejilla de Piso - Acero Carbono 32mm x 5m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.006.0003 - Montaje / Ejecución - Baranda de acero con Guardapies
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0003 - Montaje / Ejecución - Estructura Ensamblada Liviana (<= 30 kg/m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0103 - Montaje / Ejecución - Estructura Ensamblada Mediana (> 30 kg/
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0203 - Montaje / Ejecución - Estructura Ensamblada Pesada (> 60 kg/m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
27300010003C - Architectual Works
REVESTIMIENTO 30.10.001.2001 - Montaje / Ejecución - Revestimiento de Techo Plancha sin Aislac
REVESTIMIENTO
REVESTIMIENTO
REVESTIMIENTO
REVESTIMIENTO 30.10.002.2001 - Montaje / Ejecución - Revestimiento Lateral Plancha sin Aislació
REVESTIMIENTO
REVESTIMIENTO
REVESTIMIENTO
27300010004C - Mechanical Works
VENTILACION 40.30.001.5016 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VEN
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5017 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VEN
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5018 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VEN
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
BOMBA 40.60.001.1707 - Montaje / Ejecución - BOMBA BOOSTER AGUA FRESCA SISTEMA
BOMBA
BOMBA
BOMBA
BOMBA
MOTOR ELECTRICO40.60.001.1708 - Montaje / Ejecución - MOTOR ELECTRICO BOMBA BOOSTER AGU
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
SUPRESOR DE POL 40.70.001.3801 - Montaje / Ejecución - SISTEMA SUPRESOR DE POLVO DESCARGA
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POL 40.70.001.3802 - Montaje / Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POL 40.70.001.3803 - Montaje / Ejecución - SISTEMA SUPRESOR DE POLVO 3, DESCAR
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POL 40.70.001.3804 - Montaje / Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
FAJA TRANSPORTA 40.80.001.218 - Montaje / Ejecución - CINTA FAJA TRANSPORTADORA OVERLAND
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
MESAS CARGA 40.80.001.253 - Montaje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-LOAD
MESAS CARGA
MESAS CARGA
MESAS CARGA
MESAS CARGA
MESAS CARGA
MESAS CARGA
POLEA DE COLA 40.80.001.255 - Montaje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-TAIL F
POLEA DE COLA
POLEA DE COLA
POLEA DE COLA
POLEA DE COLA
POLEA DE COLA
POLEA DE COLA
MOTOR ELECTRICO40.80.001.258 - Montaje / Ejecución - MOTOR ELECTRICO GEARLESS 1 FAJA OVER
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO40.80.001.259 - Montaje / Ejecución - MOTOR ELECTRICO GEARLESS 2 FAJA OVER
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
BALANZA FAJA 40.80.001.260 - Montaje / Ejecución - BALANZA FAJA OVERLAND ; 0,5kW
BALANZA FAJA
BALANZA FAJA
BALANZA FAJA
BALANZA FAJA
BALANZA FAJA
BALANZA FAJA
FRENO POLEA MOTR
40.80.001.263 - Montaje / Ejecución - FRENO HIDRAULICO POLEA MOTRIZ 1 FAJA
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
MOTOR BOMBA POL40.80.001.264 - Montaje / Ejecución - MOTOR DE BOMBA FRENO HIDRAULICO PO
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
FRENO POLEA MOTR
40.80.001.265 - Montaje / Ejecución - FRENO HIDRAULICO POLEA MOTRIZ 2 FAJA
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
MOTOR BOMBA POL40.80.001.266 - Montaje / Ejecución - MOTOR DE BOMBA FRENO HIDRAULICO PO
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
FRENO CABESTRAN40.80.001.267 - Montaje / Ejecución - FRENO CABRESTANTE PARA FAJA TRANSPO
FRENO CABESTRANTE
FRENO CABESTRANTE
FRENO CABESTRANTE
FRENO CABESTRANTE
FRENO CABESTRANTE
FRENO CABESTRANTE
BOMBA 1 ENFRIAM40.80.001.270 - Montaje / Ejecución - MOTOR BOMBA 1 SISTEMA DE ENFRIAMIEN
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAM40.80.001.271 - Montaje / Ejecución - MOTOR BOMBA 2 SISTEMA DE ENFRIAMIEN
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
UNIDAD DE ENFRIA40.80.001.272 - Montaje / Ejecución - UNIDAD DE ENFRIAMIENTO 1 SISTEMA DE E
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIA40.80.001.273 - Montaje / Ejecución - UNIDAD DE ENFRIAMIENTO 2 SISTEMA DE E
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIA40.80.001.274 - Montaje / Ejecución - UNIDAD DE ENFRIAMIENTO 2 SISTEMA DE E
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
PANEL DE CONTROL40.80.001.275 - Montaje / Ejecución - OVERLAND CONVEYOR MOTOR WATER CO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
IDLER GUARDING 40.80.001.276 - Montaje / Ejecución - OVERLAND CONVEYOR IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
27300010007C - I&C Works
PESOMETRO 70.20.001.0003 - Montaje / Ejecución - Pesómetro de Faja
PESOMETRO
PESOMETRO
PESOMETRO
PESOMETRO
PESOMETRO
INTERRUPTOR 70.20.001.0015 - Montaje / Ejecución - Interruptor de Flujo Tipo Térmico
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INDICADOR 70.20.001.0016 - Montaje / Ejecución - Indicadores de Presión sin/con Sello
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INTERRUPTOR 70.20.001.0020 - Montaje / Ejecución - Interruptores de Presión sin/con Sello
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
SENSOR 70.20.001.0031 - Montaje / Ejecución - Sensor Temperatura
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
TRANSMISOR 70.20.001.0032 - Montaje / Ejecución - Transmisor de Temperatura
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
SIRENA 70.20.001.0038 - Montaje / Ejecución - Sirena (Horn)
SIRENA
SIRENA
SIRENA
SIRENA
SIRENA
BALIZA 70.20.001.0039 - Montaje / Ejecución - Baliza (Beacon)
BALIZA
BALIZA
BALIZA
BALIZA
BALIZA
INTERRUPTOR 70.20.001.0040 - Montaje / Ejecución - Interruptor de Desalineamiento Faja
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.0041 - Montaje / Ejecución - Interruptor de Seguridad tipo Pull Cord
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.0042 - Montaje / Ejecución - Interruptor de Corte de Faja Mecánico
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
SENSOR 70.20.001.0044 - Montaje / Ejecución - Sensor/Transmisor de Velocidad
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
DETECCION DE RU 70.20.001.0048 - Montaje / Ejecución - Sistema de Detección de Ruptura de Fajas
DETECCION DE RUPTURA
DETECCION DE RUPTURA
DETECCION DE RUPTURA
DETECCION DE RUPTURA
DETECCION DE RUPTURA
SENSOR 70.20.001.0049 - Montaje / Ejecución - Sensor/Transmisor de Vibración
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
INTERRUPTOR 70.20.001.0050 - Montaje / Ejecución - Interruptor posición contrapeso fajas
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.0052 - Montaje / Ejecución - Interruptor posición carro repartidor
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
SENSOR 70.20.001.0053 - Montaje / Ejecución - Sensor transmision de posicion
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
INTERRUPTOR 70.20.001.00X2 - Montaje / Ejecución - Interruptor de posición cerrado / abierto
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.00X3 - Montaje / Ejecución - Tipo de radar de interruptor de nivel
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
PANEL 70.20.005.0001 - Montaje / Ejecución - Panel Paquete Mecánico Tipo # 1 (Hasta 4
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL 70.20.005.0002 - Montaje / Ejecución - Panel Paquete Mecánico Tipo # 2 (Entre 41
PANEL
PANEL
PANEL
PANEL
PANEL
PLACA DE MONTAJ70.20.008.0005 - Suministro / Instalación - Suministro e Instalación Placa de Mon
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
MONTAJE INSTRU 70.40.002.0002 - Montaje / Ejecución - Caja de Terreno MONITOREO DE CONDICIO
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.40.002.0005 - Montaje / Ejecución - Rack Remoto (IO Block Terreno)
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.60.001.0002 - Montaje / Ejecución - Cámaras CCTV OUTDOOR
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.60.001.0003 - Montaje / Ejecución - Gabinete CCTV Outdoor (Power & Signal)
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
2800 MINE ANCIllARY FACILITIES
2810 - Mine Workshop
2810003 - Water Truck Tank (2810-TK-008)
28100030001- Concrete Works
PERNO 10.20.001.0003 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0004 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0103 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0104 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0008 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0108 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.002.0001 - Suministro - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
PERNO 10.20.002.0002 - Montaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
ACERO REFUERZO 10.40.001.0008 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0040 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
CONCRETO 10.40.002.2808 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2840 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.60.002.1061 - Concreto vaciado en obra - Tipo 61- Solado - Concreto f´c =100 k
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
28100030005 - Piping Works
FABRICACION DE T 51.20.004.0005 - Fabricate - Handling of pipe BU-22: BUTTERFLY LUG HP 150# SS 3
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0007 - Fabricate - Handling of pipe BU-23: BUTTERFLY LUG HP 150# SS 3
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0015 - Fabricate - Handling of pipe ELL 45 DEG FAB HDPE 130 PSI TO SD
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0025 - Fabricate - Handling of pipe ELL 45 DEG MOLDED HDPE SDR 17 P
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0028 - Fabricate - Handling of pipe ELL 90 DEG FAB HDPE 130 PSI TO SD
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0030 - Fabricate - Handling of pipe ELL 90 DEG FAB HDPE 130 PSI TO SD
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0044 - Fabricate - Handling of pipe ELL 90 DEG MOLDED HDPE SDR 17 P
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0066 - Fabricate - Handling of pipe FLANGE ADAPTOR HDPE SDR 17 PE
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0068 - Fabricate - Handling of pipe FLANGE ADAPTOR HDPE SDR 17 PE
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0070 - Fabricate - Handling of pipe FLANGE ADAPTOR HDPE SDR 17 PE
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0076 - Fabricate - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPO
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0078 - Fabricate - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPO
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0080 - Fabricate - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPO
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0114 - Fabricate - Handling of pipe TEE RED 10x6 FAB HDPE 130 PSI TO
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0010 - Fabricate - Butt Weld / Slip-on CS, NPS 6.00", Schedule SCH10S
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
INSTALACION DE T 51.40.001.0003 - Install / Perform - RT, NPS 6.00", Schedule SCH10S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0008 - Install / Perform - RT, NPS 1.00", Schedule SCH40S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0014 - Install / Perform - RT, NPS 20.00", Schedule SCH STD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0025 - Install / Perform - RT, NPS 0.50", Schedule SCH XS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0019 - Install / Perform - HYDROSTATIC of PIPE SCH 10S EFW 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0003 - Install / Perform - Double handling of CS A106, NPS 1.00", Sched
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0008 - Install / Perform - Double handling of CS A53, NPS 6.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0012 - Install / Perform - Double handling of SS 304, NPS 4.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0018 - Install / Perform - Double handling of SS 316, NPS 3.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0020 - Install / Perform - Double handling of SS 316, NPS 3.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0020 - Install / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0044 - Install / Perform - HANDLING of pipe PIPE HDPE SDR 17 PE 4710
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0049 - Install / Perform - HANDLING of pipe PIPE HDPE SDR 17 PE 4710
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0056 - Install / Perform - HANDLING of pipe BU-22: BUTTEFLY LUG HP 1
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0069 - Install / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0077 - Install / Perform - HANDLING of pipe FLG SO 150# RF 316/316L S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0010 - Install / Perform - Butt Weld / Slip-on CS, NPS 6.00", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0019 - Install / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
28100030007 - I&C Works
TRANSMISOR 70.20.001.0029 - Montaje / Ejecución - Transmisor de Nivel Tipo Radar Flanged
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
INDICADOR 70.20.001.0035 - Montaje / Ejecución - Indicadores Remotos
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INDICADOR
ACTUADOR 70.20.001.00X4 - Montaje / Ejecución - Actuador eléctrico con interruptores de po
ACTUADOR
ACTUADOR
ACTUADOR
ACTUADOR
ACTUADOR
2820 - Ancillary Facilities (No se encuentra K170 en CONTRACT de CWP List by Discipline)
2900 MINE SERVICES
2910 - Mine Fresh Water And Fire Water Systems
2910001 - Fresh Water Tank (2910-TK-001)
29100010000 - Civil Works (No se encuentra en Bill Quantity)
EXCAVACION 00.25.001.0001 - Grounding system excavation
EXCAVACION
EXCAVACION 00.25.001.0002 - Burried Conduit excavation
EXCAVACION
EXCAVACION 00.25.003.0001 - - Duct Bank excavation
EXCAVACION
RELLENO 00.30.002.0001 - Grounding system backfill and compaction
RELLENO
RELLENO 00.30.002.0002 - Burried conduit backfill and compaction
RELLENO
RELLENO 00.30.003.0004 - Montaje/Ejecución - Duct Bank backfill and compaction
RELLENO
29100010001 - Concrete Works
PERNO 10.20.001.0003 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0004 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0103 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0104 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0008 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0108 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.002.0001 - Suministro - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
PERNO 10.20.002.0002 - Montaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
ACERO REFUERZO 10.40.001.0008 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0026 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0040 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
CONCRETO 10.40.002.2808 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2826 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2840 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.60.002.1061 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
2910005 - Piping A/G (Include Fresh Water Storage, Potable Water Storage, Potable Water System, Reverse
29100050001 - Concrete Works
PERNO 10.20.001.0003 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0004 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0103 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0104 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0008 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0108 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.002.0001 - Suministro - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
PERNO 10.20.002.0002 - Montaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
ACERO REFUERZO 10.40.001.0005 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0008 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0040 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0069 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
CONCRETO 10.40.002.2169 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2805 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2808 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2840 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.60.002.1061 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
29100050005 - Piping Works
FABRICACION DE T 51.20.004.0001 - Fabricate - Handling of pipe BU-10: BUTTERFLY LUG 150 PSI CI BU
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0005 - Fabricate - Handling of pipe BU-22: BUTTERFLY LUG HP 150# SS 3
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0043 - Fabricate - Handling of pipe ELL 90 DEG MOLDED HDPE SDR 17 P
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0046 - Fabricate - Handling of pipe ELL 90 DEG MOLDED HDPE SDR 21 P
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0064 - Fabricate - Handling of pipe FLANGE ADAPTOR HDPE SDR 17 PE
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0066 - Fabricate - Handling of pipe FLANGE ADAPTOR HDPE SDR 17 PE
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0071 - Fabricate - Handling of pipe FLANGE ADAPTOR HDPE SDR 21 PE
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0074 - Fabricate - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPO
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0075 - Fabricate - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPO
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.004.0076 - Fabricate - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPO
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0002 - Fabricate - Butt Weld / Slip-on SS, NPS 10.00", Schedule SCH10S
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0003 - Fabricate - Butt Weld / Slip-on CS, NPS 12.00", Schedule SCH10S
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0004 - Fabricate - Butt Weld / Slip-on CS, NPS 12.00", Schedule SCH STD
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0010 - Fabricate - Butt Weld / Slip-on CS, NPS 6.00", Schedule SCH10S
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0011 - Fabricate - Butt Weld / Slip-on SS, NPS 6.00", Schedule SCH STD
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0012 - Fabricate - Butt Weld / Slip-on SS, NPS 8.00", Schedule SCH10S
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0016 - Fabricate - Socket Weld SS, NPS 2.00", Schedule SCH40S
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
INSTALACION DE T 51.40.001.0012 - Install / Perform - RT, NPS 6.00", Schedule SCH40S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0014 - Install / Perform - RT, NPS 20.00", Schedule SCH STD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0025 - Install / Perform - RT, NPS 0.50", Schedule SCH XS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0013 - Install / Perform - HYDROSTATIC of PIPE XS WELDED STL A53-F G
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0015 - Install / Perform - HYDROSTATIC of PIPE SCH 10S EFW 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0016 - Install / Perform - HYDROSTATIC of PIPE SCH 10S EFW 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0019 - Install / Perform - HYDROSTATIC of PIPE SCH 10S EFW 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0020 - Install / Perform - HYDROSTATIC of PIPE SCH 10S EFW 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0024 - Install / Perform - HYDROSTATIC of PIPE SCH 40S SMLS 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0014 - Install / Perform - Double handling of SS 304, NPS 0.50", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0015 - Install / Perform - Double handling of SS 304, NPS 0.75", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0017 - Install / Perform - Double handling of SS 304, NPS 2.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0018 - Install / Perform - Double handling of SS 316, NPS 3.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0021 - Install / Perform - Double handling of SS 316, NPS 3.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0014 - Install / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0016 - Install / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0017 - Install / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0020 - Install / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0021 - Install / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0025 - Install / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/31
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0047 - Install / Perform - HANDLING of pipe PIPE HDPE SDR 17 PE 4710
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0051 - Install / Perform - HANDLING of pipe PIPE HDPE SDR 21 PE 4710
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0018 - Install / Perform - HANDLING of pipe ELL 90 DEG 300# SCRD GAL
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0028 - Install / Perform - HANDLING of pipe FLG SCRD 150# RF GALV ST
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0054 - Install / Perform - HANDLING of pipe BA-10: BALL VALVE 2000 W
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0057 - Install / Perform - HANDLING of pipe BU-23: BUTTERFLY LUG HP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0058 - Install / Perform - HANDLING of pipe BU-23: BUTTERFLY LUG HP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0063 - Install / Perform - HANDLING of pipe ELL 45 SCH 10S 316/316L S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0065 - Install / Perform - HANDLING of pipe ELL 90 DEG 3000# SW 316/
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0066 - Install / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0067 - Install / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0069 - Install / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0073 - Install / Perform - HANDLING of pipe FLG SO 150# RF 316/316L S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0074 - Install / Perform - HANDLING of pipe FLG SO 150# RF 316/316L S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0078 - Install / Perform - HANDLING of pipe FLG SO 150# RF 316/316L S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0081 - Install / Perform - HANDLING of pipe FLG SW 150# RF 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0087 - Install / Perform - HANDLING of pipe REDUCER CONC SCH 10S 31
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0093 - Install / Perform - HANDLING of pipe RED TEE 10X6 SCH 10S 316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0002 - Install / Perform - Butt Weld / Slip-on SS, NPS 10.00", Schedule S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0003 - Install / Perform - Butt Weld / Slip-on CS, NPS 12.00", Schedule S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0004 - Install / Perform - Butt Weld / Slip-on CS, NPS 12.00", Schedule S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0010 - Install / Perform - Butt Weld / Slip-on CS, NPS 6.00", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0011 - Install / Perform - Butt Weld / Slip-on SS, NPS 6.00", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0012 - Install / Perform - Butt Weld / Slip-on SS, NPS 8.00", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0016 - Install / Perform - Butt Weld / Slip-on SS, NPS 2.00", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0013 - Install / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0015 - Install / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0016 - Install / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0019 - Install / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0020 - Install / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0024 - Install / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/31
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
29100050007 - I&C Works
TRANSMISOR 70.20.001.0009 - Montaje / Ejecución - Transmisor Flujo Tipo Magnético
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR 70.20.001.0022 - Montaje / Ejecución - Transmisores de Presión sin/con Sello
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR 70.20.001.0025 - Montaje / Ejecución - Sensor/Transmisor de Nivel Hidrostático
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
ACTUADOR 70.20.001.00X4 - Montaje / Ejecución - Actuador eléctrico con interruptores de po
ACTUADOR
ACTUADOR
ACTUADOR
ACTUADOR
ACTUADOR
MONTAJE INSTRU 70.40.002.0005 - Montaje / Ejecución - Rack Remoto (IO Block Terreno)
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
2910006 - Yard Pipes U/G Area Mine Service (Include Garza & Fluor Eng)
29100060000 - Civil Works
EXCAVACION 00.25.002.0007 - Excavation for Pipe trench
EXCAVACION
RELLENO 00.30.001.0009 - Sand fill
RELLENO
RELLENO 00.30.001.0010 - Pipe zone fill
RELLENO
RELLENO 00.30.001.0011 - Common fill
RELLENO
29100060005 - Piping Works
FABRICACION DE T 51.30.001.0005 - Fabricate - Butt Weld / Slip-on SS, NPS 18.00", Schedule SCH40S
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0009 - Fabricate - Butt Weld / Slip-on SS, NPS 4.00", Schedule SCH STD
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0011 - Fabricate - Butt Weld / Slip-on SS, NPS 6.00", Schedule SCH STD
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
INSTALACION DE T 51.40.001.0003 - Install / Perform - RT, NPS 6.00", Schedule SCH10S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0013 - Install / Perform - RT, NPS 18.00", Schedule SCH STD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0014 - Install / Perform - RT, NPS 20.00", Schedule SCH STD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0021 - Install / Perform - RT, NPS 6.00", Schedule SCH STD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.001.0022 - Install / Perform - RT, NPS 8.00", Schedule SCH STD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0008 - Install / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E B
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0009 - Install / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E B
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0012 - Install / Perform - HYDROSTATIC of PIPE XS WELDED STL A53-F G
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0013 - Install / Perform - HYDROSTATIC of PIPE XS WELDED STL A53-F G
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0021 - Install / Perform - HYDROSTATIC of PIPE SCH 40S EFW 316/316L
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0025 - Install / Perform - HYDROSTATIC of PIPE SDR35 B&S C/W GASKE
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0026 - Install / Perform - HYDROSTATIC of PIPE SDR35 B&S C/W GASKE
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0027 - Install / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E B
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0005 - Install / Perform - Double handling of CS A106, NPS 2.00", Sched
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0006 - Install / Perform - Double handling of CS A53, NPS 3.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0007 - Install / Perform - Double handling of CS A53, NPS 4.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0009 - Install / Perform - Double handling of SS 304, NPS 0.75", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0016 - Install / Perform - Double handling of SS 304, NPS 1.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0018 - Install / Perform - Double handling of SS 316, NPS 3.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0019 - Install / Perform - Double handling of SS 316, NPS 6.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0020 - Install / Perform - Double handling of SS 316, NPS 3.00", Schedu
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0008 - Install / Perform - HANDLING of pipe BA-08: BALL 1000 CWP SCR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0009 - Install / Perform - HANDLING of pipe BA-08: BALL 1000 CWP SCR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0011 - Install / Perform - HANDLING of pipe BA-08: BALL 1000 CWP SCR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0013 - Install / Perform - HANDLING of pipe BA-08: BALL 1000 CWP SCR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0014 - Install / Perform - HANDLING of pipe BA-08: BALL 1000 CWP SCR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0022 - Install / Perform - HANDLING of pipe BA-08: BALL 1000 CWP SCR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0001 - Install / Perform - HANDLING of pipe BA-08: BALL 1000 CWP SCR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0006 - Install / Perform - HANDLING of pipe CAP STD WT STL A234 WPB
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0007 - Install / Perform - HANDLING of pipe CAP STD WT STL A234 WPB
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0015 - Install / Perform - HANDLING of pipe ELL 45 DEG STD WT STL A2
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0017 - Install / Perform - HANDLING of pipe ELL 90 DEG 300# SCRD GAL
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0022 - Install / Perform - HANDLING of pipe ELL 90 DEG LR STD WT STL
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0023 - Install / Perform - HANDLING of pipe ELL 90 DEG LR STD WT STL
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0025 - Install / Perform - HANDLING of pipe FLG BLIND 150# RF GALV S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0027 - Install / Perform - HANDLING of pipe FLG SCRD 150# RF GALV ST
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0028 - Install / Perform - HANDLING of pipe FLG SCRD 150# RF GALV ST
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0032 - Install / Perform - HANDLING of pipe FLG SO 150# RF STL A105, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0033 - Install / Perform - HANDLING of pipe FLG SO 150# RF STL A105, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0036 - Install / Perform - HANDLING of pipe GA-19: GATE 150# RF CS A2
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0039 - Install / Perform - HANDLING of pipe GL-10: GLOBE 150# RF CS F
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0040 - Install / Perform - HANDLING of pipe LATERAL STD WT STL A234
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0041 - Install / Perform - HANDLING of pipe REDUCER 3x2 300# SCRD G
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0049 - Install / Perform - HANDLING of pipe TEE RED 6x4 STD WT STL A
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0051 - Install / Perform - HANDLING of pipe TEE STD WT STL A234 WPB
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0052 - Install / Perform - HANDLING of pipe TEE STD WT STL A234 WPB
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0070 - Install / Perform - HANDLING of pipe ELL 90 LR SCH 40S 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0079 - Install / Perform - HANDLING of pipe FLG SO 300# RF 316/316L S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0005 - Install / Perform - Butt Weld / Slip-on SS, NPS 18.00", Schedule S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0009 - Install / Perform - Butt Weld / Slip-on SS, NPS 4.00", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0011 - Install / Perform - Butt Weld / Slip-on SS, NPS 6.00", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0002 - Install / Perform - Thermo Fusion PIPE HDPE SDR 11 PE 4710 IPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0003 - Install / Perform - Thermo Fusion PIPE HDPE SDR 11 PE 4710 IPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0004 - Install / Perform - Thermo Fusion PIPE HDPE SDR 11 PE 4710 IPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0005 - Install / Perform - Thermo Fusion PIPE HDPE SDR 11 PE 4710 IPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0006 - Install / Perform - Thermo Fusion PIPE HDPE SDR 11 PE 4710 IPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0007 - Install / Perform - Thermo Fusion PIPE HDPE SDR 11 PE 4710 IPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0008 - Install / Perform - Thermo Fusion PIPE HDPE SDR 11 PE 4710 IPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0009 - Install / Perform - Thermo Fusion PIPE HDPE SDR 13.5 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0010 - Install / Perform - Thermo Fusion PIPE HDPE SDR 13.5 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0011 - Install / Perform - Thermo Fusion PIPE HDPE SDR 13.5 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0012 - Install / Perform - Thermo Fusion PIPE HDPE SDR 13.5 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0013 - Install / Perform - Thermo Fusion PIPE HDPE SDR 13.5 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0014 - Install / Perform - Thermo Fusion PIPE HDPE SDR 13.5 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0015 - Install / Perform - Thermo Fusion PIPE HDPE SDR 17 PE 4710 IPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0016 - Install / Perform - Thermo Fusion PIPE HDPE SDR 17 PE 4710 IPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0018 - Install / Perform - Thermo Fusion PIPE HDPE SDR 17 PE 4710 IPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0019 - Install / Perform - Thermo Fusion PIPE HDPE SDR 17 PE 4710 IPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0020 - Install / Perform - Thermo Fusion PIPE HDPE SDR 17 PE 4710 IPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0021 - Install / Perform - Thermo Fusion PIPE HDPE SDR 17 PE 4710 IPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0022 - Install / Perform - Thermo Fusion PIPE HDPE SDR 17 PE 4710 IPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0023 - Install / Perform - Thermo Fusion PIPE HDPE SDR 17 PE 4710 IPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.005.0053 - Install / Perform - Thermo Fusion PIPE HDPE SDR 11 PE 4710 IPS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0002 - Install / Perform - UT, PIPE HDPE SDR 11 PE 4710 IPS, NPS 10.00"
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0003 - Install / Perform - UT, PIPE HDPE SDR 11 PE 4710 IPS, NPS 12.00"
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0004 - Install / Perform - UT, PIPE HDPE SDR 11 PE 4710 IPS, NPS 2.00",
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0005 - Install / Perform - UT, PIPE HDPE SDR 11 PE 4710 IPS, NPS 3.00",
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0006 - Install / Perform - UT, PIPE HDPE SDR 11 PE 4710 IPS, NPS 4.00",
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0007 - Install / Perform - UT, PIPE HDPE SDR 11 PE 4710 IPS, NPS 6.00",
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0008 - Install / Perform - UT, PIPE HDPE SDR 11 PE 4710 IPS, NPS 8.00",
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0009 - Install / Perform - UT, PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 18.0
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0010 - Install / Perform - UT, PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 10.0
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0011 - Install / Perform - UT, PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 12.0
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0012 - Install / Perform - UT, PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 4.00
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0013 - Install / Perform - UT, PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 6.00
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0014 - Install / Perform - UT, PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 8.00
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0015 - Install / Perform - UT, PIPE HDPE SDR 17 PE 4710 IPS, NPS 10.00"
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0016 - Install / Perform - UT, PIPE HDPE SDR 17 PE 4710 IPS, NPS 12.00"
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0018 - Install / Perform - UT, PIPE HDPE SDR 17 PE 4710 IPS, NPS 16.00"
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0019 - Install / Perform - UT, PIPE HDPE SDR 17 PE 4710 IPS, NPS 2.00",
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0020 - Install / Perform - UT, PIPE HDPE SDR 17 PE 4710 IPS, NPS 3.00",
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0021 - Install / Perform - UT, PIPE HDPE SDR 17 PE 4710 IPS, NPS 4.00",
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0022 - Install / Perform - UT, PIPE HDPE SDR 17 PE 4710 IPS, NPS 6.00",
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0023 - Install / Perform - UT, PIPE HDPE SDR 17 PE 4710 IPS, NPS 8.00",
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.004.0024 - Install / Perform - UT, PIPE HDPE SDR 11 PE 4710 IPS, NPS , Sche
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0008 - Install / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0009 - Install / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0012 - Install / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0013 - Install / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0021 - Install / Perform - HANDLING of pipe PIPE SCH 40S EFW 316/316
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.80.003.0001 - Supply - Handling of pipe FH01: FIRE HYDRANT 200# FF CI/DI BA
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.80.003.0002 - Install / Perform - Handling of pipe FH01: FIRE HYDRANT 200# FF
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.80.006.0001 - Supply - HOSE REEL
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.80.006.0002 - Install / Perform - HOSE REEL
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.80.006.0003 - Supply - HOSE CABINET
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.80.006.0004 - Install / Perform - HOSE CABINET
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0001 - Install / Perform - Handling of pipe PIPE SDR35 B&S C/W GASKE
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0002 - Install / Perform - Handling of pipe PIPE SDR35 B&S C/W GASKE
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0004 - Install / Perform - Handling of pipe PIPE HDPE SDR 11 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0005 - Install / Perform - Handling of pipe PIPE HDPE SDR 11 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0006 - Install / Perform - Handling of pipe PIPE HDPE SDR 11 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0007 - Install / Perform - Handling of pipe PIPE HDPE SDR 11 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0008 - Install / Perform - Handling of pipe PIPE HDPE SDR 11 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0009 - Install / Perform - Handling of pipe PIPE HDPE SDR 11 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0010 - Install / Perform - Handling of pipe PIPE HDPE SDR 11 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0011 - Install / Perform - Handling of pipe PIPE HDPE SDR 13.5 PE 4710
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0012 - Install / Perform - Handling of pipe PIPE HDPE SDR 13.5 PE 4710
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0013 - Install / Perform - Handling of pipe PIPE HDPE SDR 13.5 PE 4710
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0014 - Install / Perform - Handling of pipe PIPE HDPE SDR 13.5 PE 4710
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0015 - Install / Perform - Handling of pipe PIPE HDPE SDR 13.5 PE 4710
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0016 - Install / Perform - Handling of pipe PIPE HDPE SDR 13.5 PE 4710
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0017 - Install / Perform - Handling of pipe PIPE HDPE SDR 17 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0018 - Install / Perform - Handling of pipe PIPE HDPE SDR 17 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0020 - Install / Perform - Handling of pipe PIPE HDPE SDR 17 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0021 - Install / Perform - Handling of pipe PIPE HDPE SDR 17 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0022 - Install / Perform - Handling of pipe PIPE HDPE SDR 17 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0023 - Install / Perform - Handling of pipe PIPE HDPE SDR 17 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0024 - Install / Perform - Handling of pipe PIPE HDPE SDR 17 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.001.0025 - Install / Perform - Handling of pipe PIPE HDPE SDR 17 PE 4710 IP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0001 - Install / Perform - Handling of pipe GA-09 GATE 125# FF DI W/VA
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0002 - Install / Perform - Handling of pipe GA-05 GATE 125# FF DI UL/FM
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0003 - Install / Perform - Handling of pipe GA-10 GATE 125# FF DI W/P
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0004 - Install / Perform - Handling of pipe GA-10 GATE 125# FF DI W/P
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0005 - Install / Perform - Handling of pipe GA-19 GATE 150# RF CS A21
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0006 - Install / Perform - Handling of pipe BU-22 BUTTERFLY LUG HP 15
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0007 - Install / Perform - Handling of pipe BU-22 BUTTERFLY LUG HP 15
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0008 - Install / Perform - Handling of pipe ELL 22.5 DEG FAB HDPE 130 P
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0009 - Install / Perform - Handling of pipe ELL 22.5 DEG FAB HDPE 160 P
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0010 - Install / Perform - Handling of pipe ELL 22.5 DEG FAB HDPE 160 P
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0011 - Install / Perform - Handling of pipe ELL 30 DEG FAB HDPE 130 PS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0012 - Install / Perform - Handling of pipe ELL 30 DEG FAB HDPE 160 PS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0013 - Install / Perform - Handling of pipe ELL 30 DEG FAB HDPE 200 PS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0014 - Install / Perform - Handling of pipe ELL 45 DEG FAB HDPE 130 PS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0015 - Install / Perform - Handling of pipe ELL 45 DEG FAB HDPE 130 PS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0016 - Install / Perform - Handling of pipe ELL 45 DEG FAB HDPE 160 PS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0017 - Install / Perform - Handling of pipe ELL 45 DEG FAB HDPE 160 PS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0018 - Install / Perform - Handling of pipe ELL 45 DEG FAB HDPE 200 PS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0019 - Install / Perform - Handling of pipe ELL 45 DEG MOLDED HDPE SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0020 - Install / Perform - Handling of pipe ELL 45 DEG MOLDED HDPE SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0021 - Install / Perform - Handling of pipe ELL 45 DEG MOLDED HDPE SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0022 - Install / Perform - Handling of pipe ELL 45 DEG MOLDED HDPE SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0023 - Install / Perform - Handling of pipe ELL 45 DEG MOLDED HDPE SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0024 - Install / Perform - Handling of pipe ELL 45 DEG MOLDED HDPE SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0025 - Install / Perform - Handling of pipe ELL 45 DEG SDR35 BxS W/GA
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0026 - Install / Perform - Handling of pipe ELL 60 DEG FAB HDPE 130 PS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0027 - Install / Perform - Handling of pipe ELL 90 DEG FAB HDPE 130 PS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0028 - Install / Perform - Handling of pipe ELL 90 DEG FAB HDPE 130 PS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0029 - Install / Perform - Handling of pipe ELL 90 DEG FAB HDPE 130 PS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0030 - Install / Perform - Handling of pipe ELL 90 DEG FAB HDPE 160 PS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0031 - Install / Perform - Handling of pipe ELL 90 DEG FAB HDPE 160 PS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0032 - Install / Perform - Handling of pipe ELL 90 DEG FAB HDPE 200 PS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0033 - Install / Perform - Handling of pipe ELL 90 DEG FAB HDPE 200 PS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0034 - Install / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0035 - Install / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0036 - Install / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0037 - Install / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0038 - Install / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0039 - Install / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0040 - Install / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0041 - Install / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0042 - Install / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0043 - Install / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0044 - Install / Perform - Handling of pipe FIRE HYDRANT 200# FF CI/DI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0045 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0046 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0047 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0048 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0049 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0050 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0051 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0052 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0053 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0054 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0055 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0056 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0057 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0058 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0059 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0060 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0061 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0062 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0063 - Install / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0064 - Install / Perform - Handling of pipe FLG BACKING, CONV, 150 PSI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0065 - Install / Perform - Handling of pipe FLG BACKING, CONV, 150 PSI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0066 - Install / Perform - Handling of pipe FLG BACKING, CONV, 150 PSI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0067 - Install / Perform - Handling of pipe FLG BACKING, CONV, 150 PSI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0068 - Install / Perform - Handling of pipe FLG BACKING, CONV, 150 PSI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0069 - Install / Perform - Handling of pipe FLG BACKING, CONV, 150 PSI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0070 - Install / Perform - Handling of pipe FLG BACKING, CONV, 150 PSI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0071 - Install / Perform - Handling of pipe FLG BACKING, CONV, 252 PSI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0072 - Install / Perform - Handling of pipe FLG BACKING, CONV, 252 PSI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0073 - Install / Perform - Handling of pipe FLG BACKING, CONV, 252 PSI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0074 - Install / Perform - Handling of pipe FLG BACKING, CONV, 252 PSI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0075 - Install / Perform - Handling of pipe FLG BACKING, CONV, 252 PSI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0076 - Install / Perform - Handling of pipe FLG BACKING, CONV, 252 PSI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0077 - Install / Perform - Handling of pipe FLG BACKING, CONV, 252 PSI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0078 - Install / Perform - Handling of pipe FLG BACKING, CONV, 252 PSI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0079 - Install / Perform - Handling of pipe FLG BLIND 150# FF STL A105,
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0080 - Install / Perform - Handling of pipe FLG BLIND 150# FF STL A105,
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0081 - Install / Perform - Handling of pipe FLG BLIND 150# FF STL A105,
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0082 - Install / Perform - Handling of pipe BU-23 BUTTERFLY LUG HP 15
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0083 - Install / Perform - Handling of pipe GA-05 GATE 125# FF DI UL/FM
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0084 - Install / Perform - Handling of pipe GA-10 GATE 125# FF DI W/PO
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0085 - Install / Perform - Handling of pipe GA-05 GATE 125# FF DI UL/F
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0086 - Install / Perform - Handling of pipe GA-09 GATE 125# FF DI W/VA
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0087 - Install / Perform - Handling of pipe BU-22 BUTTERFLY LUG HP 15
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0088 - Install / Perform - Handling of pipe BU-22 BUTTERFLY LUG HP 15
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0089 - Install / Perform - Handling of pipe RED CONC 8x6 FAB HDPE 160
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0090 - Install / Perform - Handling of pipe RED CONC 10x8 FAB HDPE 16
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0091 - Install / Perform - Handling of pipe RED CONC 6x3 HDPE 130 PSI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0092 - Install / Perform - Handling of pipe RED CONC 8x6 HDPE 130 PSI
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0093 - Install / Perform - Handling of pipe RED CONC 10x8 HDPE 130 PS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0094 - Install / Perform - Handling of pipe RED CONC 12x10 HDPE 130 P
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0095 - Install / Perform - Handling of pipe RED CONC 20x8 HDPE 255 PS
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0096 - Install / Perform - Handling of pipe TEE FAB HDPE 130 PSI TO SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0097 - Install / Perform - Handling of pipe TEE FAB HDPE 160 PSI TO SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0098 - Install / Perform - Handling of pipe TEE FAB HDPE 200 PSI TO SD
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0099 - Install / Perform - Handling of pipe TEE MOLDED HDPE SDR 11 P
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0100 - Install / Perform - Handling of pipe TEE MOLDED HDPE SDR 17 P
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0101 - Install / Perform - Handling of pipe TEE RED 6x4 FAB HDPE 130 P
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0102 - Install / Perform - Handling of pipe TEE RED 8x6 FAB HDPE 130 P
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0103 - Install / Perform - Handling of pipe TEE RED 10x6 FAB HDPE 130
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0104 - Install / Perform - Handling of pipe TEE RED 8x6 FAB HDPE 160 P
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0105 - Install / Perform - Handling of pipe TEE RED 12x4 FAB HDPE 160
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0106 - Install / Perform - Handling of pipe TEE RED 12x6 FAB HDPE 160
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0107 - Install / Perform - Handling of pipe TEE RED 12x10 FAB HDPE 16
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0108 - Install / Perform - Handling of pipe TEE RED 3x2 FAB HDPE 200 P
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0109 - Install / Perform - Handling of pipe TEE RED FAB 8x3 HDPE 200 P
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0110 - Install / Perform - Handling of pipe TEE RED FAB 8x4 HDPE 200 P
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0111 - Install / Perform - Handling of pipe TEE RED FAB 8x6 HDPE 200 P
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.90.002.0112 - Install / Perform - Handling of pipe TEE RED FAB 12x6 HDPE 200
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
2920 - Potable Water System
2920001 - Potable Water Tank (2920-TK-001)
29200010001 - Concrete Works
PERNO 10.20.001.0003 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0004 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0103 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0104 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0008 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0108 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.002.0001 - Suministro - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
PERNO 10.20.002.0002 - Montaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
ACERO REFUERZO 10.40.001.0012 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0026 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0040 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
CONCRETO 10.40.002.2812 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2826 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2840 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.1564 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.60.002.1061 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
29200010006 - Electrical Works
CONDUIT 60.20.001.0006 - Montaje / Ejecución - Escalerilla portaconductores, acero galvan
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0002 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0032 - Montaje / Ejecución - Conduit a la vista, acero flexible y cubierta
CONDUIT
CONDUIT
CONDUIT
CABLE 60.30.002.6312 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6314 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6315 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6511 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.7021 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7022 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.8101 - Montaje / Ejecución - Cable Profibus PA 1x1p;# 18 AWG, Tipo A
CABLE
CABLE
CABLE
CABLE 60.30.002.8102 - Montaje / Ejecución - Cable Profibus DP 1x1p;# 22 AWG Tipo A
CABLE
CABLE
CABLE
CABLE 60.30.002.9114 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
PUESTA A TIERRA 60.40.001.0001 - Montaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.001.0002 - Montaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0002 - Montaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0003 - Montaje / Ejecución - Monoconductor de fuerza, cobre, aislado,
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.004.0001 - Montaje / Ejecución - Ground Rod 3/4"x3m (Supplied and instal
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
CABLE 60.50.001.6315 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7021 - Montaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI C
CABLE
CABLE
CABLE
CABLE
29200010007 - I&C Works
INDICADOR 70.20.001.0016 - Montaje / Ejecución - Indicadores de Presión sin/con Sello
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INDICADOR
2930 - Plan Water Treatment Plant
2930001 - Reverse Osmosis And Potable Water Treatment Plant
29300010004 - Mechanical Works
PLANTA AGUA POT40.70.001.4701 - Montaje / Ejecución - PLANTA DE AGUA POTABLE- AREA MINA ;
PLANTA AGUA POTABLE
PLANTA AGUA POTABLE
PLANTA AGUA POTABLE
PLANTA AGUA POTABLE
PLANTA AGUA POTABLE40.70.001.4702 - Montaje / Ejecución - PLANTA OSMOSIS INVERSA
PLANTA OSMOSIS QUELLAVECO ; 3,5 M3/H AGUA RO ; 50 kW
PLANTA OSMOSIS
PLANTA OSMOSIS
PLANTA OSMOSIS
PLANTA OSMOSIS
PLANTA OSMOSIS
29300010006 - Electrical Works
CONDUIT 60.20.001.0006 - Montaje / Ejecución - Escalerilla portaconductores, acero galvan
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0002 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0032 - Montaje / Ejecución - Conduit a la vista, acero flexible y cubierta
CONDUIT
CONDUIT
CONDUIT
CABLE 60.30.002.6312 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6314 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6315 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6511 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.7021 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7022 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.8101 - Montaje / Ejecución - Cable Profibus PA 1x1p;# 18 AWG, Tipo A
CABLE
CABLE
CABLE
CABLE 60.30.002.8102 - Montaje / Ejecución - Cable Profibus DP 1x1p;# 22 AWG Tipo A
CABLE
CABLE
CABLE
CABLE 60.30.002.9114 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
PUESTA A TIERRA 60.40.001.0001 - Montaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.001.0002 - Montaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0002 - Montaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0003 - Montaje / Ejecución - Monoconductor de fuerza, cobre, aislado,
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.004.0001 - Montaje / Ejecución - Ground Rod 3/4"x3m (Supplied and instal
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
CABLE 60.50.001.6315 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7021 - Montaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI C
CABLE
CABLE
CABLE
CABLE
29300010007 - I&C Wroks
TRANSMISOR 70.20.001.0029 - Montaje / Ejecución - Transmisor de Nivel Tipo Radar Flanged
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
MONTAJE INSTRU 70.40.002.0005 - Montaje / Ejecución - Rack Remoto (IO Block Terreno)
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
2940 - Plant Mine Sewage Treatment Plant
2940001 - Mine Sewage Treatment Plant
29400010003 - Architectual Works (No se encuentra en Bill Quantity)
29400010004 - Mechanical Works
PLANTA TRATAMIE40.70.001.4601 - Montaje / Ejecución - PLANTA TRATAMIENTO AGUAS SERVIDAS
PLANTA TRATAMIENTO AGUAS SERVIDAS
PLANTA TRATAMIENTO AGUAS SERVIDAS
PLANTA TRATAMIENTO AGUAS SERVIDAS
PLANTA TRATAMIENTO AGUAS SERVIDAS
PLANTA TRATAMIENTO AGUAS SERVIDAS
29400010006 - Electrical Works
CONDUIT 60.20.001.0003 - Montaje / Ejecución - Escalerilla portaconductores, acero galvan
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.001.0005 - Montaje / Ejecución - Escalerilla portaconductores, acero galvan
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0002 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0003 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0004 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0005 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0006 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0032 - Montaje / Ejecución - Conduit a la vista, acero flexible y cubierta
CONDUIT
CONDUIT
CONDUIT
60.20.002.0043 - Montaje / Ejecución - Conduit directamente enterrado, acero ga
CONDUIT
CONDUIT
CONDUIT
60.20.002.0057 - Montaje / Ejecución - Conduit en banco de ductos, PVC Schedule
CONDUIT
CONDUIT
CONDUIT
60.20.002.0058 - Montaje / Ejecución - Conduit en banco de ductos, PVC Schedule
CONDUIT
CONDUIT
CONDUIT
60.30.001.1307 - Montaje / Ejecución - Multiconductor de cobre, clase 25 kV, apa
CABLE
CABLE
CABLE
60.30.001.3103 - Montaje / Ejecución - Monoconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
60.30.001.3310 - Montaje / Ejecución - Monoconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
60.30.001.6103 - Montaje / Ejecución - Monoconductor de fuerza, cobre, clase 60
CABLE
CABLE
CABLE
60.30.001.6308 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
60.30.001.6313 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
60.30.001.6314 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
60.30.001.6409 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
60.30.001.6410 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
60.30.001.6411 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
60.30.001.6412 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
60.30.001.6511 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
60.30.001.7012 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
60.30.001.8011 - Montaje / Ejecución - Multi-triada, conductor de cobre, clase 30
CABLE
CABLE
CABLE
60.30.001.8012 - Montaje / Ejecución - Multi-triada, conductor de cobre, clase 30
CABLE
CABLE
CABLE
60.30.001.9113 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
60.30.001.9114 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
60.30.002.1307 - Montaje / Ejecución - Multiconductor de cobre, clase 25 kV, apa
CABLE
CABLE
CABLE
60.30.002.3103 - Montaje / Ejecución - Monoconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
60.30.002.3105 - Montaje / Ejecución - Monoconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
60.30.002.3310 - Montaje / Ejecución - Multiconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
60.30.002.6103 - Montaje / Ejecución - Monoconductor de fuerza, cobre, clase 60
CABLE
CABLE
CABLE
60.30.002.6308 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6312 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6313 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6314 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6315 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6409 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6410 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6411 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6412 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6413 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6508 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6511 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.7012 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7021 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7022 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7334 - Montaje / Ejecución - Multi-triada, conductor de cobre, clase 30
CABLE
CABLE
CABLE
CABLE 60.30.002.7338 - Montaje / Ejecución - Multi-triada, conductor de cobre, clase 30
CABLE
CABLE
CABLE
CABLE 60.30.002.8101 - Montaje / Ejecución - Cable Profibus PA 1x1p;# 18 AWG, Tipo A
CABLE
CABLE
CABLE
CABLE 60.30.002.8102 - Montaje / Ejecución - Cable Profibus DP 1x1p;# 22 AWG Tipo A
CABLE
CABLE
CABLE
CABLE 60.30.002.8300 - Montaje / Ejecución - Cable Ethernet (UTP)
CABLE
CABLE
CABLE
CABLE 60.30.002.9114 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
PUESTA A TIERRA 60.40.001.0001 - Montaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.001.0002 - Montaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0001 - Montaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0002 - Montaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0003 - Montaje / Ejecución - Monoconductor de fuerza, cobre, aislado,
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.004.0001 - Montaje / Ejecución - Ground Rod 3/4"x3m (Supplied and instal
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.005.0001 - Montaje / Ejecución - Conexionado Cable de Aterrizamiento 1x1
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.006.0004 - Montaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", c
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
CABLE 60.50.001.1407 - Montaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 1/0, 2
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.1427 - Montaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 1/0, 2
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.3103 - Montaje / Ejecución - CABLE TERMINATION KIT, 1/C MCM 350, 5
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.3105 - Montaje / Ejecución - CABLE TERMINATION KIT, 1/C AWG 4/0, 5
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.3410 - Montaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 4, 5 KV
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6103 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, SINGLE CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6308 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6313 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6314 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6315 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6409 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6410 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6411 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6412 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6413 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6508 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6511 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7012 - Montaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI C
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7021 - Montaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI C
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7334 - Montaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI T
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7338 - Montaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI T
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.9113 - Montaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE
CABLE
CABLE
CABLE
CABLE
CABLE 60.60.002.0002 - Montaje / Ejecución - Estación de control local (Botonera), "Para
CABLE
CABLE
CABLE
CABLE 60.60.002.0004 - Montaje / Ejecución - THREE PHASE RECEPTACLE ASSEMBLY, 600
CABLE
CABLE
CABLE
CABLE 60.60.002.0005 - Montaje / Ejecución - SINGLE PHASE RECEPTACLE ASSEMBLY, 60
CABLE
CABLE
CABLE
CABLE 60.60.005.0062 - Montaje / Ejecución - Proyector industrial LED, montaje en muro
CABLE
CABLE
CABLE
CABLE 60.60.005.0073 - Montaje / Ejecución - Equipo alumbrado público (1 unidad), LED
CABLE
CABLE
CABLE
TRANSFORMADOR 60.70.001.0006 - Montaje / Ejecución - DISTRIBUTION TRANSFORMER, 500 kVA, 2
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.001.0008 - Montaje / Ejecución - DISTRIBUTION TRANSFORMER, 150 kVA, 4
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.004.0001 - Montaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G,
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.004.0002 - Montaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G,
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.004.0003 - Montaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G,
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.004.0004 - Montaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 2P, 125 V
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 02 FEEDER CIRCUIT BREAKER, 630 A
TRANSFORMADOR (TAG No.: XXXX-HA-XXX-XX)
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 02 FEEDER CIRCUIT BREAKER, 600 A
TRANSFORMADOR (TAG No.: XXXX-HA-XXX-XX)
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 01 MAIN CIRCUIT BREAKER, 1200 A
TRANSFORMADOR 05 MOTOR STARTER, 400 A
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 01 MAIN CIRCUIT BREAKER, 1200 A
TRANSFORMADOR 04 MOTOR STARTER, 400 A
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.006.0005 - Montaje / Ejecución - MOTOR CONTROL CENTER, 480 V, 1200 A,
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.008.0101 - Montaje / Ejecución - BATTERY CHARGER, 400 V-125 V (dc)
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.009.0002 - Montaje / Ejecución - BATTERY BANK, 125 V (dc)
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.020.0000 - - Installation of Electrical Room
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
2950 - Mine Pit Reclaim Water System
2950004 - Mine Pit Reclaim Water Storage Sub-station & Eroon (2950-ER-001)
29500040000 - Civil Works (No se encuentra en Bill Quantity, solo el paquete 8)
EXCAVACION 00.25.001.0001 - Grounding system excavation
EXCAVACION
EXCAVACION 00.25.001.0002 - Burried Conduit excavation
EXCAVACION
EXCAVACION 00.25.003.0001 - - Duct Bank excavation
EXCAVACION
EXCAVACION 00.25.003.0002 - - Manhole excavation
EXCAVACION
RELLENO 00.30.002.0001 - Grounding system backfill and compaction
RELLENO
RELLENO 00.30.002.0002 - Burried conduit backfill and compaction
RELLENO
RELLENO 00.30.003.0004 - Montaje/Ejecución - Duct Bank backfill and compaction
RELLENO
RELLENO 00.30.003.0005 - Montaje/Ejecución - Manhole backfill and compaction
RELLENO
29500040001 - Concrete Works
PERNO 10.20.001.0001 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0002 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0101 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0102 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0003 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0004 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0103 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0104 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.002.0001 - Suministro - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
PERNO 10.20.002.0002 - Montaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
ACERO REFUERZO 10.40.001.0001 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0002 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0005 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0006 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0009 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0026 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0064 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0069 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
CONCRETO 10.40.002.2169 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2801 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2802 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2805 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2806 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2809 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2826 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.1564 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.60.002.1061 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
29500040006 - Electrical Works
CONDUIT 60.20.001.0003 - Montaje / Ejecución - Escalerilla portaconductores, acero galvan
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.001.0005 - Montaje / Ejecución - Escalerilla portaconductores, acero galvan
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0002 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0003 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0004 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0005 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0006 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0032 - Montaje / Ejecución - Conduit a la vista, acero flexible y cubierta
CONDUIT
CONDUIT
CONDUIT
60.20.002.0043 - Montaje / Ejecución - Conduit directamente enterrado, acero ga
CONDUIT
CONDUIT
CONDUIT
60.20.002.0057 - Montaje / Ejecución - Conduit en banco de ductos, PVC Schedule
CONDUIT
CONDUIT
CONDUIT
60.20.002.0058 - Montaje / Ejecución - Conduit en banco de ductos, PVC Schedule
CONDUIT
CONDUIT
CONDUIT
60.30.001.1307 - Montaje / Ejecución - Multiconductor de cobre, clase 25 kV, apa
CABLE
CABLE
CABLE
60.30.001.3103 - Montaje / Ejecución - Monoconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
60.30.001.3310 - Montaje / Ejecución - Monoconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
60.30.001.6103 - Montaje / Ejecución - Monoconductor de fuerza, cobre, clase 60
CABLE
CABLE
CABLE
60.30.001.6308 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
60.30.001.6313 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
60.30.001.6314 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
60.30.001.6409 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
60.30.001.6410 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
60.30.001.6411 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
60.30.001.6412 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
60.30.001.6511 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
60.30.001.7012 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
60.30.001.8011 - Montaje / Ejecución - Multi-triada, conductor de cobre, clase 30
CABLE
CABLE
CABLE
60.30.001.8012 - Montaje / Ejecución - Multi-triada, conductor de cobre, clase 30
CABLE
CABLE
CABLE
60.30.001.9113 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
60.30.001.9114 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
60.30.002.1307 - Montaje / Ejecución - Multiconductor de cobre, clase 25 kV, apa
CABLE
CABLE
CABLE
60.30.002.3103 - Montaje / Ejecución - Monoconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
60.30.002.3105 - Montaje / Ejecución - Monoconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
60.30.002.3310 - Montaje / Ejecución - Multiconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
60.30.002.6103 - Montaje / Ejecución - Monoconductor de fuerza, cobre, clase 60
CABLE
CABLE
CABLE
60.30.002.6308 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6312 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6313 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6314 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6315 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6409 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6410 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6411 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6412 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6413 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6508 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6511 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.7012 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7021 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7022 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7334 - Montaje / Ejecución - Multi-triada, conductor de cobre, clase 30
CABLE
CABLE
CABLE
CABLE 60.30.002.7338 - Montaje / Ejecución - Multi-triada, conductor de cobre, clase 30
CABLE
CABLE
CABLE
CABLE 60.30.002.8101 - Montaje / Ejecución - Cable Profibus PA 1x1p;# 18 AWG, Tipo A
CABLE
CABLE
CABLE
CABLE 60.30.002.8102 - Montaje / Ejecución - Cable Profibus DP 1x1p;# 22 AWG Tipo A
CABLE
CABLE
CABLE
CABLE 60.30.002.8300 - Montaje / Ejecución - Cable Ethernet (UTP)
CABLE
CABLE
CABLE
CABLE 60.30.002.9114 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
PUESTA A TIERRA 60.40.001.0001 - Montaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.001.0002 - Montaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0001 - Montaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0002 - Montaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0003 - Montaje / Ejecución - Monoconductor de fuerza, cobre, aislado,
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.004.0001 - Montaje / Ejecución - Ground Rod 3/4"x3m (Supplied and instal
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.005.0001 - Montaje / Ejecución - Conexionado Cable de Aterrizamiento 1x1
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.006.0004 - Montaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", c
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
CABLE 60.50.001.1407 - Montaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 1/0, 2
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.1427 - Montaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 1/0, 2
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.3103 - Montaje / Ejecución - CABLE TERMINATION KIT, 1/C MCM 350, 5
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.3105 - Montaje / Ejecución - CABLE TERMINATION KIT, 1/C AWG 4/0, 5
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.3410 - Montaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 4, 5 KV
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6103 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, SINGLE CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6308 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6313 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6314 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6315 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6409 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6410 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6411 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6412 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6413 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6508 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6511 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7012 - Montaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI C
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7021 - Montaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI C
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7334 - Montaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI T
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7338 - Montaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI T
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.9113 - Montaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE
CABLE
CABLE
CABLE
CABLE
CABLE 60.60.002.0002 - Montaje / Ejecución - Estación de control local (Botonera), "Para
CABLE
CABLE
CABLE
CABLE 60.60.002.0004 - Montaje / Ejecución - THREE PHASE RECEPTACLE ASSEMBLY, 600
CABLE
CABLE
CABLE
CABLE 60.60.002.0005 - Montaje / Ejecución - SINGLE PHASE RECEPTACLE ASSEMBLY, 60
CABLE
CABLE
CABLE
CABLE 60.60.005.0062 - Montaje / Ejecución - Proyector industrial LED, montaje en muro
CABLE
CABLE
CABLE
CABLE 60.60.005.0073 - Montaje / Ejecución - Equipo alumbrado público (1 unidad), LED
CABLE
CABLE
CABLE
TRANSFORMADOR 60.70.001.0006 - Montaje / Ejecución - DISTRIBUTION TRANSFORMER, 500 kVA, 2
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.001.0008 - Montaje / Ejecución - DISTRIBUTION TRANSFORMER, 150 kVA, 4
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.004.0001 - Montaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G,
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.004.0002 - Montaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G,
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.004.0003 - Montaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G,
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.004.0004 - Montaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 2P, 125 V
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 02 FEEDER CIRCUIT BREAKER, 630 A
TRANSFORMADOR (TAG No.: XXXX-HA-XXX-XX)
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 02 FEEDER CIRCUIT BREAKER, 600 A
TRANSFORMADOR (TAG No.: XXXX-HA-XXX-XX)
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
01 MAIN CIRCUIT BREAKER, 1200 A
TRANSFORMADOR 05 MOTOR STARTER, 400 A
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 01 MAIN CIRCUIT BREAKER, 1200 A
TRANSFORMADOR 04 MOTOR STARTER, 400 A
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.006.0005 - Montaje / Ejecución - MOTOR CONTROL CENTER, 480 V, 1200 A,
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.008.0101 - Montaje / Ejecución - BATTERY CHARGER, 400 V-125 V (dc)
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.009.0002 - Montaje / Ejecución - BATTERY BANK, 125 V (dc)
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.020.0000 - - Installation of Electrical Room
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
29500040007 - I&C Works
TRANSMISOR 70.20.001.0009 - Montaje / Ejecución - Transmisor Flujo Tipo Magnético
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
ACTUADOR 70.20.001.00X4 - Montaje / Ejecución - Actuador eléctrico con interruptores de po
ACTUADOR
ACTUADOR
ACTUADOR
ACTUADOR
ACTUADOR
TABLERO 70.20.006.0002 - Montaje / Ejecución - Tablero de Alimentación para Instrumenta
TABLERO
TABLERO
TABLERO
TABLERO
TABLERO
MONTAJE INSTRU 70.40.002.0005 - Montaje / Ejecución - Rack Remoto (IO Block Terreno)
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
2950008 - Reclaim Water Platform Earthworks (ERoom & Transformer)
29500080000 - Civil Works (No se encuentra en CWP)
EXCAVACION 00.20.003.0001 - Montaje / Ejecución - Excavación de Escarpe
EXCAVACION
RELLENO 00.30.004.0002 - Montaje/Ejecución - Relleno Masivo Clase B
RELLENO
RELLENO 00.30.007.0001 - Montaje/Ejecución - Preparación de Subrasante
RELLENO
EXECUTION FRONT 03
2700 COARSE ORE HANDLING TO STOCKPILE
2720 - Coarse Ore Handling Substations And Electrical Room
2720001 - Coarse Ore Handling Electrical Room
27200010000 - Civil Works (No se encuentra en Bill Quantity)
EXCAVACION 00.25.001.0001 - Grounding system excavation
EXCAVACION
EXCAVACION 00.25.001.0002 - Burried Conduit excavation
EXCAVACION
EXCAVACION 00.25.003.0001 - - Duct Bank excavation
EXCAVACION
EXCAVACION 00.25.003.0002 - - Manhole excavation
EXCAVACION
EXCAVACION 00.25.003.0003 - - Lighting pole foundation excavation
EXCAVACION
RELLENO 00.30.002.0001 - Grounding system backfill and compaction
RELLENO
RELLENO 00.30.002.0002 - Burried conduit backfill and compaction
RELLENO
RELLENO 00.30.003.0004 - Montaje/Ejecución - Duct Bank backfill and compaction
RELLENO
RELLENO 00.30.003.0005 - Montaje/Ejecución - Manhole backfill and compaction
RELLENO
RELLENO 00.30.003.0006 - Montaje/Ejecución - Lighting pole foundation backfill and compa
RELLENO
27200010001 - Concrete Works
PERNO 10.20.001.0001 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0002 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0101 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0102 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0003 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0004 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0103 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0104 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.002.0001 - Suministro - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
PERNO 10.20.002.0002 - Montaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
ACERO REFUERZO 10.40.001.0001 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0002 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0005 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0006 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0009 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0026 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0064 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0069 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
CONCRETO 10.40.002.2169 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2801 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2802 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2805 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2806 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2809 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2826 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.1564 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.1565 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.60.002.1061 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
27200010006 - Electrical Works
ESCALERILLA POR 60.20.001.0003 - Montaje / Ejecución - Escalerilla portaconductores, acero galvan
ESCALERILLA PORTACONDUCTOR
ESCALERILLA PORTACONDUCTOR
ESCALERILLA PORTACONDUCTOR
ESCALERILLA POR 60.20.001.0005 - Montaje / Ejecución - Escalerilla portaconductores, acero galvan
ESCALERILLA PORTACONDUCTOR
ESCALERILLA PORTACONDUCTOR
ESCALERILLA PORTACONDUCTOR
ESCALERILLA POR 60.20.001.0006 - Montaje / Ejecución - Escalerilla portaconductores, acero galvan
ESCALERILLA PORTACONDUCTOR
ESCALERILLA PORTACONDUCTOR
ESCALERILLA PORTACONDUCTOR
CONDUIT 60.20.002.0002 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0003 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0004 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0005 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0006 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0007 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0014 - Montaje / Ejecución - Conduit a la vista, PVC Schedule 80 resiste
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0043 - Montaje / Ejecución - Conduit directamente enterrado, acero ga
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0057 - Montaje / Ejecución - Conduit en banco de ductos, PVC Schedule
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0058 - Montaje / Ejecución - Conduit en banco de ductos, PVC Schedule
CONDUIT
CONDUIT
CONDUIT
CABLE 60.30.001.9113 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
CABLE 60.30.002.1102 - Montaje / Ejecución - Monoconductor de cobre, clase 25 kV, apa
CABLE
CABLE
CABLE
CABLE 60.30.002.1103 - Montaje / Ejecución - Monoconductor de cobre, clase 25 kV, apa
CABLE
CABLE
CABLE
CABLE 60.30.002.3103 - Montaje / Ejecución - Monoconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
CABLE 60.30.002.3105 - Montaje / Ejecución - Monoconductor de cobre, clase 5 kV, apan
CABLE
CABLE
CABLE
CABLE 60.30.002.6102 - Montaje / Ejecución - Monoconductor de fuerza, cobre, clase 60
CABLE
CABLE
CABLE
CABLE 60.30.002.6103 - Montaje / Ejecución - Monoconductor de fuerza, cobre, clase 60
CABLE
CABLE
CABLE
CABLE 60.30.002.6306 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6313 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6314 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6315 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6409 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6410 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6411 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6412 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6414 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6505 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6507 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6509 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6511 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6512 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6513 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6514 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.7002 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7011 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7012 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7014 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7021 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7022 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7221 - Montaje / Ejecución - Par apantallado, conductor de cobre, Clas
CABLE
CABLE
CABLE
CABLE 60.30.002.7331 - Montaje / Ejecución - Cable de Instrumentación 1x1t;# 18 AWG
CABLE
CABLE
CABLE
CABLE 60.30.002.7334 - Montaje / Ejecución - Multi-triada, conductor de cobre, clase 30
CABLE
CABLE
CABLE
CABLE 60.30.002.7338 - Montaje / Ejecución - Multi-triada, conductor de cobre, clase 30
CABLE
CABLE
CABLE
CABLE 60.30.002.8101 - Montaje / Ejecución - Cable Profibus PA 1x1p;# 18 AWG, Tipo A
CABLE
CABLE
CABLE
CABLE 60.30.002.8102 - Montaje / Ejecución - Cable Profibus DP 1x1p;# 22 AWG Tipo A
CABLE
CABLE
CABLE
CABLE 60.30.002.8300 - Montaje / Ejecución - Cable Ethernet (UTP)
CABLE
CABLE
CABLE
CABLE 60.30.002.9113 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
CABLE 60.30.002.9114 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
PUESTA A TIERRA 60.40.001.0001 - Montaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.001.0002 - Montaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0001 - Montaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0002 - Montaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0003 - Montaje / Ejecución - Monoconductor de fuerza, cobre, aislado,
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.003.0001 - Montaje / Ejecución - Ground Bar In Man Holes (Supplied and in
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.004.0001 - Montaje / Ejecución - Ground Rod 3/4"x3m (Supplied and instal
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.005.0001 - Montaje / Ejecución - Conexionado Cable de Aterrizamiento 1x1
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PARARRAYOS 60.40.006.0004 - Montaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", c
PARARRAYOS
PARARRAYOS
PARARRAYOS
CABLE 60.50.001.1103 - Montaje / Ejecución - CABLE TERMINATION KIT, 1/C MCM 350, 2
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.1122 - Montaje / Ejecución - CABLE TERMINATION KIT, 1/C MCM 350, 2
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.1425 - Montaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 2/0, 2
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.3103 - Montaje / Ejecución - CABLE TERMINATION KIT, 1/C MCM 350, 5
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.3105 - Montaje / Ejecución - CABLE TERMINATION KIT, 1/C AWG 4/0, 5
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6102 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, SINGLE CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6103 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, SINGLE CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6306 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6313 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6314 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6315 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6409 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6410 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6411 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6412 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6414 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6505 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6507 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6509 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6511 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6512 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6513 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.6514 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7002 - Montaje / Ejecución - TERMINATION OF CONTROL CABLE, 600 V
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7011 - Montaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI C
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7012 - Montaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI C
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7014 - Montaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI C
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7021 - Montaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI C
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7334 - Montaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI T
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7338 - Montaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI T
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.9113 - Montaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.9114 - Montaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE
CABLE
CABLE
CABLE
CABLE
ACCESORIO ELECTR60.60.002.0002 - Montaje / Ejecución - Estación de control local (Botonera), "Para
ACCESORIO ELECTRICO
ACCESORIO ELECTRICO
ACCESORIO ELECTRICO
ACCESORIO ELECTR60.60.002.0004 - Montaje / Ejecución - THREE PHASE RECEPTACLE ASSEMBLY, 600
ACCESORIO ELECTRICO
ACCESORIO ELECTRICO
ACCESORIO ELECTRICO
ACCESORIO ELECTR60.60.002.0005 - Montaje / Ejecución - SINGLE PHASE RECEPTACLE ASSEMBLY, 60
ACCESORIO ELECTRICO
ACCESORIO ELECTRICO
ACCESORIO ELECTRICO
LUMINARIA 60.60.005.0034 - Montaje / Ejecución - Luminaria industrial LED, montaje en muro
LUMINARIA
LUMINARIA
LUMINARIA
PROYECTOR LED 60.60.005.0073 - Montaje / Ejecución - Equipo alumbrado público (1 unidad), LED
PROYECTOR LED
PROYECTOR LED
PROYECTOR LED
ILUMINACION EME60.60.005.0092 - Montaje / Ejecución - Equipo de alumbrado de emergencia, mon
ILUMINACION EMERGENCIA
ILUMINACION EMERGENCIA
ILUMINACION EMERGENCIA
TRANSFORMADOR 60.70.001.0005 - Montaje / Ejecución - DISTRIBUTION TRANSFORMER, 250 kVA ,
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.001.0006 - Montaje / Ejecución - DISTRIBUTION TRANSFORMER, 250 kVA ,
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR 60.70.001.0007 - Montaje / Ejecución - DISTRIBUTION TRANSFORMER, 250 kVA ,
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
TRANSFORMADOR
PANEL 60.70.004.0002 - Montaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G,
PANEL
PANEL
PANEL
PANEL
PANEL 60.70.004.0003 - Montaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G,
PANEL
PANEL
PANEL
PANEL
PANEL 60.70.004.0004 - Montaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 2P, 125 V
PANEL
PANEL
PANEL
PANEL 03 FEEDER CIRCUIT BREAKER, 630 A
SWITCHGEAR (TAG No.: XXXX-HA-XXX-XX)
SWITCHGEAR
SWITCHGEAR
SWITCHGEAR
SWITCHGEAR 01 TIE CIRCUIT BREAKER, 1200 A
MOTOR CONTROL C08 MOTOR STARTER, 400 A
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
MOTOR CONTROL C60.70.006.0005 - Montaje / Ejecución - MOTOR CONTROL CENTER, 480 V, 1200 A,
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
VARIABLE FREQUEN60.70.007.0001 - Montaje / Ejecución - VARIABLE FREQUENCY DRIVE, 3550 kW, 4
VARIABLE FREQUENCY DRIVE
VARIABLE FREQUENCY DRIVE
VARIABLE FREQUENCY DRIVE
VARIABLE FREQUENCY DRIVE
BATERIA 60.70.008.0101 - Montaje / Ejecución - BATTERY CHARGER, 400 V-125 V (dc)
BATERIA
BATERIA
BATERIA
BATERIA
BATERIA 60.70.009.0002 - Montaje / Ejecución - BATTERY BANK, 125 V (dc)
BATERIA
BATERIA
BATERIA
BATERIA 60.70.014.0002 - Montaje / Ejecución - BUSBAR DUCT, 480 V, 3200 A, 65 kA
BUSBAR (TAG No.: XXXX-ED-XXX)
BUSBAR
BUSBAR
BUSBAR
BUSBAR
SALA ELECTRICA 60.70.020.0000
SALA ELECTRICA
HARMONIC EQ 60.70.030.0000
HARMONIC EQ
2730D - Conveyor Belt From Primary Crusher Ore To Stockpile (Compartido con Frente 02)
2730001D - Overland Conveyor Belt To Ore Stockpile
27300010000D - Civil Works (No se encuentra en Bill Quantity)
27300010001D - Concrete Works
PERNO 10.20.001.0001 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0002 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0101 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0102 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0003 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0004 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0103 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0104 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0008 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0108 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0012 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0112 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.002.0001 - Suministro - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
PERNO 10.20.002.0002 - Montaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
ACERO REFUERZO 10.40.001.0005 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0006 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0009 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0010 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0011 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0027 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
CONCRETO 10.40.002.2805 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2806 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2809 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2810 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.2811 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.3527 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.60.002.1061 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
27300010002D - Steel Works
ESTRUCTURA ACER20.10.001.0003 - Montaje / Ejecución - Acero Estructural Liviano (<= 30 kg/m)
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0103 - Montaje / Ejecución - Acero Estructural Mediano (> 30 kg/m y <=
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0203 - Montaje / Ejecución - Acero Estructural Pesado (> 60 kg/m y <=
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0303 - Montaje / Ejecución - Acero Estructural Extra Pesado (> 90 kg/m
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0403 - Montaje / Ejecución - Acero Estructural Doble Extra Pesado (> 15
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0503 - Montaje / Ejecución - Acero Estructural Triple Extra Pesado (> 30
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO 20.10.005.0003 - Montaje / Ejecución - Rejilla de Piso - Acero Carbono 32mm x 5m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.006.0003 - Montaje / Ejecución - Baranda de acero con Guardapies
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0003 - Montaje / Ejecución - Estructura Ensamblada Liviana (<= 30 kg/m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0103 - Montaje / Ejecución - Estructura Ensamblada Mediana (> 30 kg/
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0203 - Montaje / Ejecución - Estructura Ensamblada Pesada (> 60 kg/m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
27300010003D - Architectual Works
REVESTIMIENTO 30.10.001.2001 - Montaje / Ejecución - Revestimiento de Techo Plancha sin Aislac
REVESTIMIENTO
REVESTIMIENTO
REVESTIMIENTO
REVESTIMIENTO 30.10.002.2001 - Montaje / Ejecución - Revestimiento Lateral Plancha sin Aislació
REVESTIMIENTO
REVESTIMIENTO
REVESTIMIENTO
27300010004D - Mechanical Works
VENTILACION 40.30.001.5016 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VEN
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5017 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VEN
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION 40.30.001.5018 - Montaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VEN
VENTILACION
VENTILACION
VENTILACION
VENTILACION
VENTILACION
BOMBA 40.60.001.1707 - Montaje / Ejecución - BOMBA BOOSTER AGUA FRESCA SISTEMA
BOMBA
BOMBA
BOMBA
BOMBA
MOTOR ELECTRICO40.60.001.1708 - Montaje / Ejecución - MOTOR ELECTRICO BOMBA BOOSTER AGU
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
CHUTE DESCARGA F40.70.001.2630 - Montaje / Ejecución - CHUTE DESCARGA FAJA OVERLAND ; 1200
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
CHUTE ALIMENTACI40.70.001.2631 - Montaje / Ejecución - CHUTE ALIMENTACION FAJA OVERLAND ;
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
SUPRESOR DE POL 40.70.001.3801 - Montaje / Ejecución - SISTEMA SUPRESOR DE POLVO DESCARGA
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POL 40.70.001.3802 - Montaje / Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POL 40.70.001.3803 - Montaje / Ejecución - SISTEMA SUPRESOR DE POLVO 3, DESCAR
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POL 40.70.001.3804 - Montaje / Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
SUPRESOR DE POLVO
FAJA TRANSPORTA 40.80.001.218 - Montaje / Ejecución - CINTA FAJA TRANSPORTADORA OVERLAND
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
FAJA TRANSPORTADORA
GALERIAS FAJA 83.10.003.3002 - Montaje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-GALE
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
GALERIAS STACKER40.80.001.249 - Montaje / Ejecución - Galerías
GALERIAS STACKER
GALERIAS STACKER
GALERIAS STACKER
GALERIAS STACKER
GALERIAS STACKER
GALERIAS STACKER
GALERIAS STACKER40.80.001.250 - Montaje / Ejecución - Item 3: Galería Stacker
GALERIAS STACKER
GALERIAS STACKER
GALERIAS STACKER
GALERIAS STACKER
GALERIAS STACKER
GALERIAS STACKER
GALERIA CHUTE 40.80.001.251 - Montaje / Ejecución - Item 5: Galería Inc 5000 kg Chute/sin Pulley
GALERIA CHUTE
GALERIA CHUTE
GALERIA CHUTE
GALERIA CHUTE
GALERIA CHUTE
GALERIA CHUTE
MESAS DE IMPACT 40.80.001.252 - Montaje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-IMPAC
MESAS DE IMPACTO
MESAS DE IMPACTO
MESAS DE IMPACTO
MESAS DE IMPACTO
MESAS DE IMPACTO
MESAS DE IMPACTO
MESAS CARGA 40.80.001.253 - Montaje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-LOAD
MESAS CARGA
MESAS CARGA
MESAS CARGA
MESAS CARGA
MESAS CARGA
MESAS CARGA
POLEA DE CABEZA 40.80.001.254 - Montaje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-HEAD
POLEA DE CABEZA
POLEA DE CABEZA
POLEA DE CABEZA
POLEA DE CABEZA
POLEA DE CABEZA
POLEA DE CABEZA
POLEA DE COLA 40.80.001.255 - Montaje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-TAIL F
POLEA DE COLA
POLEA DE COLA
POLEA DE COLA
POLEA DE COLA
POLEA DE COLA
POLEA DE COLA
TAKE UP ASSEMBLY40.80.001.256 - Montaje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-TAKE-
TAKE UP ASSEMBLY
TAKE UP ASSEMBLY
TAKE UP ASSEMBLY
TAKE UP ASSEMBLY
TAKE UP ASSEMBLY
TAKE UP ASSEMBLY
COUNTERWEIGHT A40.80.001.257 - Montaje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-COUN
COUNTERWEIGHT ASSEMBLY
COUNTERWEIGHT ASSEMBLY
COUNTERWEIGHT ASSEMBLY
COUNTERWEIGHT ASSEMBLY
COUNTERWEIGHT ASSEMBLY
COUNTERWEIGHT ASSEMBLY
MOTOR ELECTRICO40.80.001.258 - Montaje / Ejecución - MOTOR ELECTRICO GEARLESS 1 FAJA OVER
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO GEARLESS 1
MOTOR ELECTRICO40.80.001.259 - Montaje / Ejecución - MOTOR ELECTRICO GEARLESS 2 FAJA OVER
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
MOTOR ELECTRICO GEARLESS 2
BALANZA FAJA 40.80.001.260 - Montaje / Ejecución - BALANZA FAJA OVERLAND ; 0,5kW
BALANZA FAJA
BALANZA FAJA
BALANZA FAJA
BALANZA FAJA
BALANZA FAJA
BALANZA FAJA
WINCHE MANTENIM40.80.001.261 - Montaje / Ejecución - WINCHE DE MANTENIENTO DE CONTRAPES
WINCHE MANTENIMIENTO FAJA
WINCHE MANTENIMIENTO FAJA
WINCHE MANTENIMIENTO FAJA
WINCHE MANTENIMIENTO FAJA
WINCHE MANTENIMIENTO FAJA
WINCHE MANTENIMIENTO FAJA
WINCHE MANTENIM40.80.001.262 - Montaje / Ejecución - WINCHE MANTENIMIENTO POLEA DE CABE
WINCHE MANTENIMIENTO POLEA CABEZA
WINCHE MANTENIMIENTO POLEA CABEZA
WINCHE MANTENIMIENTO POLEA CABEZA
WINCHE MANTENIMIENTO POLEA CABEZA
WINCHE MANTENIMIENTO POLEA CABEZA
WINCHE MANTENIMIENTO POLEA CABEZA
FRENO POLEA MOTR
40.80.001.263 - Montaje / Ejecución - FRENO HIDRAULICO POLEA MOTRIZ 1 FAJA
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
FRENO POLEA MOTRIZ 1
MOTOR BOMBA POL 40.80.001.264 - Montaje / Ejecución - MOTOR DE BOMBA FRENO HIDRAULICO PO
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
FRENO POLEA MOTR 40.80.001.265 - Montaje / Ejecución - FRENO HIDRAULICO POLEA MOTRIZ 2 FAJA
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
FRENO POLEA MOTRIZ 2
MOTOR BOMBA POL 40.80.001.266 - Montaje / Ejecución - MOTOR DE BOMBA FRENO HIDRAULICO PO
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
MOTOR BOMBA POLEA MOTRIZ 2
FRENO CABESTRAN40.80.001.267 - Montaje / Ejecución - FRENO CABRESTANTE PARA FAJA TRANSPO
FRENO CABESTRANTE
FRENO CABESTRANTE
FRENO CABESTRANTE
FRENO CABESTRANTE
FRENO CABESTRANTE
FRENO CABESTRANTE
MOTOR BOMBA FR40.80.001.268 - Montaje / Ejecución - MOTOR BOMBA FRENO CABRESTANTE PAR
MOTOR BOMBA FRENO CABESTRANTE
MOTOR BOMBA FRENO CABESTRANTE
MOTOR BOMBA FRENO CABESTRANTE
MOTOR BOMBA FRENO CABESTRANTE
MOTOR BOMBA FRENO CABESTRANTE
MOTOR BOMBA FRENO CABESTRANTE
SISTEMA DE ENFRI 40.80.001.269 - Montaje / Ejecución - SISTEMA DE ENFRIAMIENTO MOTORES FAJ
SISTEMA DE ENFRIAMIENTO
SISTEMA DE ENFRIAMIENTO
SISTEMA DE ENFRIAMIENTO
SISTEMA DE ENFRIAMIENTO
SISTEMA DE ENFRIAMIENTO
SISTEMA DE ENFRIAMIENTO
BOMBA 1 ENFRIAM40.80.001.270 - Montaje / Ejecución - MOTOR BOMBA 1 SISTEMA DE ENFRIAMIEN
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 1 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAM40.80.001.271 - Montaje / Ejecución - MOTOR BOMBA 2 SISTEMA DE ENFRIAMIEN
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
BOMBA 2 ENFRIAMIENTO MOTORES
UNIDAD DE ENFRIA40.80.001.272 - Montaje / Ejecución - UNIDAD DE ENFRIAMIENTO 1 SISTEMA DE E
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIAMIENTO 1
UNIDAD DE ENFRIA40.80.001.273 - Montaje / Ejecución - UNIDAD DE ENFRIAMIENTO 2 SISTEMA DE E
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIA40.80.001.274 - Montaje / Ejecución - UNIDAD DE ENFRIAMIENTO 2 SISTEMA DE E
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
UNIDAD DE ENFRIAMIENTO 2
PANEL DE CONTROL40.80.001.275 - Montaje / Ejecución - OVERLAND CONVEYOR MOTOR WATER CO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
PANEL DE CONTROL SISTEMA ENFRIAMIENTO
IDLER GUARDING 40.80.001.276 - Montaje / Ejecución - OVERLAND CONVEYOR IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
IDLER GUARDING
POLIPLASTO MANTE40.80.001.3201 - Montaje / Ejecución - POLIPASTO ELECTRICO MANTENCION FAJA
POLIPLASTO MANTENCION FAJAS
POLIPLASTO MANTENCION FAJAS
POLIPLASTO MANTENCION FAJAS
POLIPLASTO MANTENCION FAJAS
POLIPLASTO POLEA40.80.001.3205 - Montaje / Ejecución - POLIPASTO ELECTRICO POLEA CABEZA FAJ
POLIPLASTO POLEA CABEZA
POLIPLASTO POLEA CABEZA
POLIPLASTO POLEA CABEZA
POLIPLASTO POLEA CABEZA
POLIPLASTO MANTE40.80.001.3206 - Montaje / Ejecución - POLIPASTO ELECTRICO MANTENCION FAJA
POLIPLASTO MANTENCION FAJAS
POLIPLASTO MANTENCION FAJAS
POLIPLASTO MANTENCION FAJAS
POLIPLASTO MANTENCION FAJAS
27300010007D - I&C Works
PESOMETRO 70.20.001.0003 - Montaje / Ejecución - Pesómetro de Faja
PESOMETRO
PESOMETRO
PESOMETRO
PESOMETRO
PESOMETRO
INTERRUPTOR 70.20.001.0015 - Montaje / Ejecución - Interruptor de Flujo Tipo Térmico
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INDICADOR 70.20.001.0016 - Montaje / Ejecución - Indicadores de Presión sin/con Sello
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INTERRUPTOR 70.20.001.0020 - Montaje / Ejecución - Interruptores de Presión sin/con Sello
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
SENSOR 70.20.001.0031 - Montaje / Ejecución - Sensor Temperatura
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
TRANSMISOR 70.20.001.0032 - Montaje / Ejecución - Transmisor de Temperatura
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
SIRENA 70.20.001.0038 - Montaje / Ejecución - Sirena (Horn)
SIRENA
SIRENA
SIRENA
SIRENA
SIRENA
BALIZA 70.20.001.0039 - Montaje / Ejecución - Baliza (Beacon)
BALIZA
BALIZA
BALIZA
BALIZA
BALIZA
INTERRUPTOR 70.20.001.0040 - Montaje / Ejecución - Interruptor de Desalineamiento Faja
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.0041 - Montaje / Ejecución - Interruptor de Seguridad tipo Pull Cord
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.0042 - Montaje / Ejecución - Interruptor de Corte de Faja Mecánico
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
SENSOR 70.20.001.0044 - Montaje / Ejecución - Sensor/Transmisor de Velocidad
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
DETECCION DE RU 70.20.001.0048 - Montaje / Ejecución - Sistema de Detección de Ruptura de Fajas
DETECCION DE RUPTURA
DETECCION DE RUPTURA
DETECCION DE RUPTURA
DETECCION DE RUPTURA
DETECCION DE RUPTURA
SENSOR 70.20.001.0049 - Montaje / Ejecución - Sensor/Transmisor de Vibración
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
INTERRUPTOR 70.20.001.0050 - Montaje / Ejecución - Interruptor posición contrapeso fajas
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.0052 - Montaje / Ejecución - Interruptor posición carro repartidor
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
SENSOR 70.20.001.0053 - Montaje / Ejecución - Sensor transmision de posicion
SENSOR
SENSOR
SENSOR
SENSOR
SENSOR
INTERRUPTOR 70.20.001.00X2 - Montaje / Ejecución - Interruptor de posición cerrado / abierto
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR 70.20.001.00X3 - Montaje / Ejecución - Tipo de radar de interruptor de nivel
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
PANEL 70.20.005.0001 - Montaje / Ejecución - Panel Paquete Mecánico Tipo # 1 (Hasta 4
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL 70.20.005.0002 - Montaje / Ejecución - Panel Paquete Mecánico Tipo # 2 (Entre 41
PANEL
PANEL
PANEL
PANEL
PANEL
PLACA DE MONTAJ70.20.008.0005 - Suministro / Instalación - Suministro e Instalación Placa de Mon
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
PLACA DE MONTAJE
MONTAJE INSTRU 70.40.002.0002 - Montaje / Ejecución - Caja de Terreno MONITOREO DE CONDICIO
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.40.002.0005 - Montaje / Ejecución - Rack Remoto (IO Block Terreno)
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.60.001.0002 - Montaje / Ejecución - Cámaras CCTV OUTDOOR
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.60.001.0003 - Montaje / Ejecución - Gabinete CCTV Outdoor (Power & Signal)
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
2800 MINE ANCIllARY FACILITIES
2840 - Fuel Tanks And Stations
2840002 - Light Duty Vehicles Fuel Station
28400020002 - Steel Structures
ESTRUCTURA ACER20.10.001.0003 - Montaje / Ejecución - Acero Estructural Liviano (<= 30 kg/m)
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0103 - Montaje / Ejecución - Acero Estructural Mediano (> 30 kg/m y <=
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACER20.10.001.0203 - Montaje / Ejecución - Acero Estructural Pesado (> 60 kg/m y <=
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO 20.10.005.0003 - Montaje / Ejecución - Rejilla de Piso - Acero Carbono 32mm x 5m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.008.0003 - Montaje / Ejecución - Escalera Ensamblada, incluye largueros, de
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0003 - Montaje / Ejecución - Estructura Ensamblada Liviana (<= 30 kg/m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0103 - Montaje / Ejecución - Estructura Ensamblada Mediana (> 30 kg/
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO 20.10.009.0203 - Montaje / Ejecución - Estructura Ensamblada Pesada (> 60 kg/m
ESTRUCTURA ACERO AUXILIAR
ESTRUCTURA ACERO AUXILIAR
2840004 - Diesel Storage Discharge Area
28400040000 - Civil Works
EXCAVACION 00.25.001.0001 - Grounding system excavation
EXCAVACION
EXCAVACION 00.25.001.0002 - Burried Conduit excavation
EXCAVACION
EXCAVACION 00.25.003.0001 - - Duct Bank excavation
EXCAVACION
EXCAVACION 00.25.003.0002 - - Manhole excavation
EXCAVACION
EXCAVACION 00.25.003.0003 - - Lighting pole foundation excavation
EXCAVACION
RELLENO 00.30.002.0001 - Grounding system backfill and compaction
RELLENO
RELLENO 00.30.002.0002 - Burried conduit backfill and compaction
RELLENO
RELLENO 00.30.003.0004 - Montaje/Ejecución - Duct Bank backfill and compaction
RELLENO
RELLENO 00.30.003.0005 - Montaje/Ejecución - Manhole backfill and compaction
RELLENO
RELLENO 00.30.003.0006 - Montaje/Ejecución - Lighting pole foundation backfill and compa
RELLENO
28400040001 - Concrete Works
PERNO 10.20.001.0003 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0004 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0103 - Suministro - Perno de anclaje estándar ASTM F1554 Gr36 Diáme
PERNO
PERNO
PERNO
PERNO 10.20.001.0104 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0008 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.001.0108 - Montaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr3
PERNO
PERNO
PERNO
PERNO 10.20.002.0001 - Suministro - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
PERNO 10.20.002.0002 - Montaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
PERNO
PERNO
PERNO
ACERO REFUERZO 10.40.001.0008 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO 10.40.001.0069 - Suministro e Instalación/Ejecución - Refuerzo de Concreto ASTM
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
ACERO REFUERZO
CONCRETO 10.40.002.2808 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.1564 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.40.002.1565 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO 10.60.002.1061 - Suministro e Instalación/Ejecución - Concreto vaciado en obra -
CONCRETO
CONCRETO
CONCRETO
CONCRETO
CONCRETO
28400040002 - Steel Works (No existe en BoQ)
ESTRUCTURA ACER20.10.001.0003 - Montaje / Ejecución - Acero Estructural Liviano (<= 30 kg/m)
ESTRUCTURA ACERO
ESTRUCTURA ACERO
ESTRUCTURA ACERO
28400040004 - Mechanical Works (Excluding Diesel Tanks) (Se muestra en CWP contrato K170 pero no e
BOMBA 40.60.001.1715 - Montaje / Ejecución - BOMBA DESCARGA DIESEL MINA; 60 M3/H
BOMBA
BOMBA
BOMBA
BOMBA
MOTOR CONTROL C40.60.001.1716 - Montaje / Ejecución - MOTOR ELECTRICO BOMBA DESCARGA DI
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
MOTOR CONTROL CENTER
BOMBA 40.60.001.1717 - Montaje / Ejecución - BOMBA DESCARGA DIESEL MINA; 60 M3/H
BOMBA
BOMBA
BOMBA
BOMBA
MOTOR ELECTRICO40.60.001.1718 - Montaje / Ejecución - MOTOR ELECTRICO BOMBA DESCARGA DI
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
MOTOR ELECTRICO
28400040006 - Electrical Works
ESCALERILLA POR 60.20.001.0005 - Montaje / Ejecución - Escalerilla portaconductores, acero galvan
ESCALERILLA PORTACONDUCTOR
ESCALERILLA PORTACONDUCTOR
ESCALERILLA PORTACONDUCTOR
CONDUIT 60.20.002.0002 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0004 - Montaje / Ejecución - Conduit a la vista, acero galvanizado en ca
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0032 - Montaje / Ejecución - Conduit a la vista, acero flexible y cubierta
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0043 - Montaje / Ejecución - Conduit directamente enterrado, acero ga
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0057 - Montaje / Ejecución - Conduit en banco de ductos, PVC Schedule
CONDUIT
CONDUIT
CONDUIT
CONDUIT 60.20.002.0058 - Montaje / Ejecución - Conduit en banco de ductos, PVC Schedule
CONDUIT
CONDUIT
CONDUIT
CABLE 60.30.001.6314 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.001.9113 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
CABLE 60.30.002.6312 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6314 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.6315 - Montaje / Ejecución - Multiconductor de fuerza, cobre, clase 600
CABLE
CABLE
CABLE
CABLE 60.30.002.7021 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7022 - Montaje / Ejecución - Multiconductor de control, clase 600 V, ai
CABLE
CABLE
CABLE
CABLE 60.30.002.7331 - Montaje / Ejecución - Cable de Instrumentación 1x1t;# 18 AWG
CABLE
CABLE
CABLE
CABLE 60.30.002.8101 - Montaje / Ejecución - Cable Profibus PA 1x1p;# 18 AWG, Tipo A
CABLE
CABLE
CABLE
CABLE 60.30.002.8102 - Montaje / Ejecución - Cable Profibus DP 1x1p;# 22 AWG Tipo A
CABLE
CABLE
CABLE
CABLE 60.30.002.9114 - Montaje / Ejecución - Monoconductor de alumbrado, cobre, clas
CABLE
CABLE
CABLE
PUESTA A TIERRA 60.40.001.0001 - Montaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.001.0002 - Montaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0001 - Montaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0002 - Montaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.002.0003 - Montaje / Ejecución - Monoconductor de fuerza, cobre, aislado,
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.005.0001 - Montaje / Ejecución - Conexionado Cable de Aterrizamiento 1x1
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.003.0001 - Montaje / Ejecución - Ground Bar In Man Holes (Supplied and in
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA 60.40.004.0001 - Montaje / Ejecución - Ground Rod 3/4"x3m (Supplied and instal
PUESTA A TIERRA
PUESTA A TIERRA
PUESTA A TIERRA
PARARRAYOS 60.40.006.0004 - Montaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", c
PARARRAYOS
PARARRAYOS
PARARRAYOS
PARARRAYOS 60.40.006.0005 - Montaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", c
PARARRAYOS
PARARRAYOS
PARARRAYOS 60.40.006.0006 - Montaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", c
PARARRAYOS
PARARRAYOS
CABLE 60.50.001.6315 - Montaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CO
CABLE
CABLE
CABLE
CABLE
CABLE 60.50.001.7021 - Montaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI C
CABLE
CABLE
CABLE
CABLE
PROYECTOR LED 60.60.005.0071 - Montaje / Ejecución - Equipo alumbrado público (1 unidad), LED
PROYECTOR LED
PROYECTOR LED
PROYECTOR LED
28400040007 - I&C Works
TRANSMISOR 70.20.001.0010 - Montaje / Ejecución - Transmisor Flujo Tipo Coriolis
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
INDICADOR 70.20.001.0016 - Montaje / Ejecución - Indicadores de Presión sin/con Sello
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INDICADOR
TRANSMISOR 70.20.001.0029 - Montaje / Ejecución - Transmisor de Nivel Tipo Radar Flanged
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
TRANSMISOR
INTERRUPTOR 70.20.001.0030 - Montaje / Ejecución - Interruptor de Nivel Vibratorio
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INTERRUPTOR
INDICADOR 70.20.001.0036 - Montaje / Ejecución - Indicadores Remotos Carguío Camiones
INDICADOR
INDICADOR
INDICADOR
INDICADOR
INDICADOR
SIRENA 70.20.001.0038 - Montaje / Ejecución - Sirena (Horn)
SIRENA
SIRENA
SIRENA
SIRENA
SIRENA
BALIZA 70.20.001.0039 - Montaje / Ejecución - Baliza (Beacon)
BALIZA
BALIZA
BALIZA
BALIZA
BALIZA
MONTAJE INSTRU 70.50.001.0005 - Montaje / Ejecución - Gabinetes Comunicaciones en Terreno
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.60.001.0002 - Montaje / Ejecución - Cámaras CCTV OUTDOOR
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRU 70.60.001.0003 - Montaje / Ejecución - Gabinete CCTV Outdoor (Power & Signal)
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
MONTAJE INSTRUMENTOS
2840007 - Piping A/G Diesel Storage (Charge & Discharge)
28400070005 - Piping Works
FABRICACION DE T 51.20.001.0001 - Fabricate - Handling of pipe PIPE XS SMLS STL A106-B, NPS 0.75"
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.20.001.0002 - Fabricate - Handling of pipe PIPE XS SMLS STL A106-B, NPS 1.00"
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
INSTALACION DE T 51.20.001.0007 - Install / Perform - Handling of pipe PIPE XS SMLS STL A106-B, NP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.001.0008 - Install / Perform - Handling of pipe PIPE XS SMLS STL A106-B, NP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0009 - Install / Perform - Handling of BA-18: BALL 600# SW CS RTFE HN
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0010 - Install / Perform - Handling of BA-18: BALL 600# SW CS RTFE HN
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0020 - Install / Perform - Handling of ELL 90 DEG 3000# SW STL A105, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.20.002.0025 - Install / Perform - Handling of GA-08: GATE 800# SW CS F6/STEL
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
FABRICACION DE T 51.30.001.0009 - Fabricate - Butt Weld / Slip-on SS, NPS 4.00", Schedule SCH STD
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0011 - Fabricate - Butt Weld / Slip-on SS, NPS 6.00", Schedule SCH STD
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0012 - Fabricate - Butt Weld / Slip-on SS, NPS 8.00", Schedule SCH10S
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
FABRICACION DE T 51.30.001.0013 - Fabricate - Socket Weld SS, NPS 0.75", Schedule SCH XS
FABRICACION DE TUBERIAS
FABRICACION DE TUBERIAS
INSTALACION DE T 51.40.001.0007 - Install / Perform - RT, NPS 0.75", Schedule SCH40S
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0001 - Install / Perform - HYDROSTATIC of PIPE XS SMLS STL A106-B, NP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0002 - Install / Perform - HYDROSTATIC of PIPE XS SMLS STL A106-B, NP
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0008 - Install / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E B
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0009 - Install / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E B
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.40.007.0010 - Install / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E B
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0004 - Install / Perform - Double handling of CS A106, NPS 1.50", Sched
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0005 - Install / Perform - Double handling of CS A106, NPS 2.00", Sched
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 51.60.101.0008 - Install / Perform - Double handling of CS A106, NPS 2.00", Sched
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0001 - Install / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0002 - Install / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0008 - Install / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0009 - Install / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.001.0010 - Install / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0008 - Install / Perform - HANDLING of pipe CH-02: CHECK SWING 150#
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0014 - Install / Perform - HANDLING of pipe ELL 45 DEG STD WT STL A2
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0016 - Install / Perform - HANDLING of pipe ELL 45 DEG STD WT STL A2
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0022 - Install / Perform - HANDLING of pipe ELL 90 DEG LR STD WT STL
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0023 - Install / Perform - HANDLING of pipe ELL 90 DEG LR STD WT STL
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0024 - Install / Perform - HANDLING of pipe ELL 90 DEG LR STD WT STL
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0026 - Install / Perform - HANDLING of pipe FLG BLIND 150# RF STL A10
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0031 - Install / Perform - HANDLING of pipe FLG SO 150# RF STL A105, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0032 - Install / Perform - HANDLING of pipe FLG SO 150# RF STL A105, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0033 - Install / Perform - HANDLING of pipe FLG SO 150# RF STL A105, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0034 - Install / Perform - HANDLING of pipe FLG SO 150# RF STL A105, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0036 - Install / Perform - HANDLING of pipe GA-19: GATE 150# RF CS A2
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0037 - Install / Perform - HANDLING of pipe GA-19: GATE 150# RF CS A2
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0038 - Install / Perform - HANDLING of pipe GA-21: GATE 150# RF CS F6
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0043 - Install / Perform - HANDLING of pipe SOCKOLET 4x0.75 3000# ST
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0049 - Install / Perform - HANDLING of pipe TEE RED 6x4 STD WT STL A
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.20.003.0051 - Install / Perform - HANDLING of pipe TEE STD WT STL A234 WPB
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0009 - Install / Perform - Butt Weld / Slip-on SS, NPS 4.00", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0011 - Install / Perform - Butt Weld / Slip-on SS, NPS 6.00", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0012 - Install / Perform - Butt Weld / Slip-on SS, NPS 8.00", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.30.001.0013 - Install / Perform - Butt Weld / Slip-on SS, NPS 0.75", Schedule SC
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0001 - Install / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0002 - Install / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, N
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0008 - Install / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0009 - Install / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.40.006.0010 - Install / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
INSTALACION DE T 52.80.004.0002 - Install / Perform - DUCHA EMERGENCIA DESCARGA DIESEL 2840
INSTALACION DE TUBERIAS
INSTALACION DE TUBERIAS
WBS
WBS
WBS
WBS - I&C Works
CAMARA CCTV 70.20.008.0009 - Suministro / Instalación - Soporte de Instalación cámaras CCTV T
CAMARA CCTV
CAMARA CCTV
CAMARA CCTV
CAMARA CCTV
CAMARA CCTV
EXECUTION FRONT 04
2600 PRIMARY CRUSHER BUILDING
2610 - Primary Crusher Building
2610004 - Primary Crusher
26100040083 - Modularizacion
PREENSAMBLE 83.10.002.1001 - Preensamble Cajas de Escaleras eje B, parte inferior - Chancador
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE 83.10.002.1002 - Preensamble Cajas de Escaleras eje B, parte superior - Chancado
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE
2610009 - Primary Crusher DataCenter (Only Erection)
26100090083 - Modularizacion
MODULOS 83.10.006.1001 - Modulos fabricados en el taller del proveedor - Primary Crusher
MODULOS
MODULOS
MODULOS
2610014 - Control Room, UPS & Communication Rooms (Include Fire detection System)
26100140083 - Modularizacion
MODULOS 83.10.006.1002 - Modulos fabricados en el taller del proveedor - Control Room, U
MODULOS
MODULOS
MODULOS
2700 COARSE ORE HANDLING TO STOCKPILE
2730 - Conveyor Belt from Primary Crusher Ore to Stockpile
2730001 - Overland Conveyor Belt to Coarse Ore Stockpile
27300010083 - Modularizacion
PREENSAMBLE 83.10.003.1002 - Preensamble de Mesas de Impacto -Overland Conveyor 2730-CV
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE 83.10.003.2002 - Preensamble de Mesas de Carga -Overland Conveyor 2730-CV-0
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE 83.10.003.3002 - Preensamble de Galerias - Overland Conveyor 2730-CV-001-GAL
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE 83.10.003.5001 - Preensamble de Marco de Poleas de Cabeza - Overland Conveyo
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE 83.10.003.6002 - Preensamble de Marco de Poleas de Cola - OVERLAND CONVEYO
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE 83.10.003.7002 - Preensamble del Sistema Tensor - OVERLAND CONVEYOR 2730-
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE 83.10.003.8002 - Preensamble de Contrapeso - OVERLAND CONVEYOR 2730-CV-0
PREENSAMBLE 83.10.003.9001 - Preensamble de Miscelaneos - SACRIFICE BELT CONVEYOR 2730
2730002 - Sacrificial Conveyor To Transfer Tower
27300020083 - Modularizacion
PREENSAMBLE 83.10.003.1001 - Preensamble de Mesas de Impacto - Faja de Sacrificio 2730-CV-0
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE 83.10.003.2001 - Preensamble de Mesas de Carga - Faja de Sacrificio 2730-CV-001
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE 83.10.003.3001 - Preensamble de Galerias - Faja de Sacrificio 2730-CV-001-GALER
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE 83.10.003.5001 - Preensamble de Marco de Poleas de Cabeza - Overland Conveyo
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE 83.10.003.6001 - Preensamble de Marco de Poleas de Cola - Faja de Sacrificio 273
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE 83.10.003.7001 - Preensamble del Sistema Tensor - SACRIFICE BELT CONVEYOR 27
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE 83.10.003.8001 - Preensamble de Contrapeso - SACRIFICE BELT CONVEYOR 2730-C
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE 83.10.003.9001 - Preensamble de Miscelaneos - SACRIFICE BELT CONVEYOR 2730
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE
2900 MINE SERVICES
2930 - Plant Water Treatment Plant
2930001 - Reverse Osmosis and Potable Water Treatment Plant
29300010083 - Modularizacion
PREENSAMBLE 83.10.006.1006 - Modulos fabricados en el taller del proveedor - Mine Potable W
PREENSAMBLE
PREENSAMBLE
PREENSAMBLE
2940 - Plant Mine Sewage Treatment Plant
2940001 - Mine Sewage Treatment Plant
29400010083 - Modularizacion
MODULOS 83.10.006.1003 - Modulos fabricados en el taller del proveedor - Mine Sewage Tre
MODULOS
MODULOS
MODULOS
MODULOS 83.10.006.1004 - Modulos fabricados en el taller del proveedor - Mine Sewage Tre
MODULOS
MODULOS
MODULOS
MODULOS 83.10.006.1005 - Modulos fabricados en el taller del proveedor - Mine Sewage Tre
MODULOS
MODULOS
MODULOS
FRENTE
FASE
Activity ID Peso C.FASE C.FRENTE

cilities Erection

ilización de Instalaciones / Preparación


2000 Movilizacion de Instalaciones / Preparacion EARLY WOREXECUTION GENERALES
lación del Campamento de Construcción (Contratista)
2000 Instalacion del Campamento de Construccion (Contratista) EARLY WOREXECUTION GENERALES

nnel Inlet Portal

ntaje / Ejecución - Excavación de Escarpe


2010 Excavacion de escarpe en Access Road Overland Conv 100% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Relleno Masivo Clase B
2010 Relleno Masivo Clase B en Access Road Overland Con 100% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Preparación de Subrasante
2010 Preparacion de Subrasante en Access Road Overland 100% CONSTRUCTEXECUTION FRONT 01
firmado granular para plataformas y caminos
2010 Afirmado granular para plataformas y caminos en Ac 100% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Pretil de seguridad h=0,5m
2010 Pretil de seguridad h=0,5m en Access Road Overland 100% CONSTRUCTEXECUTION FRONT 01
Mine Area
ra en Bill Quantity)
uellaveco Area
tity menciona 2000/2010)
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 1 1/2"
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 4"
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Conduit directamente enterrado, acero galvanizado en caliente ANSI C80.1, diámetro 1"
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Conduit directamente enterrado, acero galvanizado en caliente ANSI C80.1, diámetro 1 1/2"
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Conduit en banco de ductos, PVC Schedule 40, diámetro 6"
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 4/0 AWG, 1x4c+T
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Tendido terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 8 AWG, 1x4c+T
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Tendido terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 10 AWG, 1x4c+T
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Tendido terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x4c+T
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Tendido terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 10 AWG, 1x1c
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Tendido terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 12 AWG, 1x1c
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Tendido terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", con base horizontal, montado en poste recto ortogonal de acero galvan
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", con base horizontal, montado en poste recto ortogonal de acero galvan
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", con base horizontal, montado en estructura
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 4/0, XLPE/LSZH, BLACK JACKET
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Instalacion de mufas de terminacion y union y/o termi 50% CONSTRUCTEXECUTION FRONT 01
2010 Conexionado en Electrical Utilities Bulk / Lighting Q 20% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 8, XLPE/LSZH, BLACK
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Instalacion de mufas de terminacion y union y/o termi 50% CONSTRUCTEXECUTION FRONT 01
2010 Conexionado en Electrical Utilities Bulk / Lighting Q 20% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 10, XLPE/LSZH, BLACK
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Instalacion de mufas de terminacion y union y/o termi 50% CONSTRUCTEXECUTION FRONT 01
2010 Conexionado en Electrical Utilities Bulk / Lighting Q 20% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 12, XLPE/LSZH, BLACK
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Instalacion de mufas de terminacion y union y/o termi 50% CONSTRUCTEXECUTION FRONT 01
2010 Conexionado en Electrical Utilities Bulk / Lighting Q 20% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE CONDUCTOR, 1/C AWG 10, HALOGEN FREE, RED
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Instalacion de mufas de terminacion y union y/o termi 50% CONSTRUCTEXECUTION FRONT 01
2010 Conexionado en Electrical Utilities Bulk / Lighting Q 20% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE CONDUCTOR, 1/C AWG 12, HALOGEN FREE, RED
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Instalacion de mufas de terminacion y union y/o termi 50% CONSTRUCTEXECUTION FRONT 01
2010 Conexionado en Electrical Utilities Bulk / Lighting Q 20% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Equipo alumbrado público (1 unidad), LED, montaje en poste recto ortogonal de acero galvanizado de 9 m, 258 W
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Corona móvil de iluminación de 10 luminarias, montaje en poste de 30 m
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Corona móvil de iluminación de 3 luminarias, montaje en poste de 30 m
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01

ntaje / Ejecución - Preparación de Subrasante


2010 Preparacion de Subrasante en Final Grading Area 20 100% CONSTRUCTEXECUTION FRONT 01
firmado granular para plataformas y caminos
2010 Afirmado granular para plataformas y caminos en Fi 100% CONSTRUCTEXECUTION FRONT 01
pertenece a K170)

smontaje - BOMBA CENTRIFUGA HORIZONTAL AGUA RECUPERADA MINA ; 276 M3/H @ 260.5 MCF
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
smontaje - MOTOR ELECTRICO BOMBA CENTRIFUGA HORIZONTAL AGUA RECUPERADA (DEWATERING) ; 336kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
smontaje - BOMBA CENTRIFUGA HORIZONTAL AGUA RECUPERADA MINA ; 276 M3/H @ 260.5 MCF
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
smontaje - MOTOR ELECTRICO BOMBA CENTRIFUGA HORIZONTAL AGUA RECUPERADA (DEWATERING) ; 336kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01

ntaje / Ejecución - Excavación de Escarpe


2610 Excavación de escarpe e=0.30 cm 100% CONSTRUCTEXECUTION FRONT 01
ounding system excavation
2610 Excavación para puesta a tierra 100% CONSTRUCTEXECUTION FRONT 01
ried Conduit excavation
2610 Excavación para conductos enterrados 100% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Cama de Apoyo
2610 Suministro, transporte, la colocación y compactació 100% CONSTRUCTEXECUTION FRONT 01
ounding system backfill and compaction
2610 Relleno para puesta a tierra 100% CONSTRUCTEXECUTION FRONT 01
ried conduit backfill and compaction
2610 Relleno para conductos enterrados 100% CONSTRUCTEXECUTION FRONT 01
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”
2610 Suministro y Colocacion en Primary Crusher Building 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”
2610 Suministro y Colocacion en Primary Crusher Building 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 01
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2610 Suministro y Colocacion en Primary Crusher Building 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2610 Suministro y Colocacion en Primary Crusher Building 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 01
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2610 Suministro y Colocacion en Primary Crusher Building 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2610 Suministro y Colocacion en Primary Crusher Building 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 01
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2610 Suministro y Colocacion en Primary Crusher Building 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2610 Suministro y Colocacion en Primary Crusher Building 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Perno de anclaje especial AISI 1020 Diámetro 4 1/2”
2610 Suministro y Colocacion en Primary Crusher Building 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 01
ministro - Inserto estándar ASTM A36 Peso < 200 kg
2610 Suministro y Colocacion en Primary Crusher Building 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
2610 Suministro y Colocacion en Primary Crusher Building 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Insertos especiales ASTM A36 Peso ≥ 200 kg
2610 Suministro y Colocacion en Primary Crusher Building 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 01
ministro - Mortero de nivelación cementicio sin retracción
2610 Suministro - Mortero de nivelación cementicio sin re 100% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Mortero de nivelación cementicio sin retracción
2610 Colocación de placas de Nivelación 10% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de mortero cementicio sin retracción 40% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado 50% CONSTRUCTEXECUTION FRONT 01
ministro - Mortero de nivelación epóxico
2610 Suministro - Mortero de nivelación epóxico 100% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Mortero de nivelación epóxico
2610 Colocación de placas de Nivelación 10% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de mortero epoxico 40% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado 50% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 01- Cimentación Aislada, vol <8m3
2610 Suministro en Primary Crusher Building 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado en Primary Crusher Building 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 02- Cimentación Continua
2610 Suministro en Primary Crusher Building 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado en Primary Crusher Building 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 03- Viga de Cimentación
2610 Suministro en Primary Crusher Building 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado en Primary Crusher Building 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 05- Losa Cimentación e < 1m
2610 Suministro en Primary Crusher Building 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado en Primary Crusher Building 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 06- Losa Cimentación 1m <= e < 2m
2610 Suministro en Primary Crusher Building 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado en Primary Crusher Building 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 07- Losa Cimentación e => 2m
2610 Suministro en Primary Crusher Building 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado en Primary Crusher Building 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 09- Pedestal Sección <= 1m2
2610 Suministro en Primary Crusher Building 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado en Primary Crusher Building 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 10- Pedestal Sección > 1m2
2610 Suministro en Primary Crusher Building 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado en Primary Crusher Building 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 20- Columnas
2610 Suministro en Primary Crusher Building 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado en Primary Crusher Building 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 21- Vigas
2610 Suministro en Primary Crusher Building 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado en Primary Crusher Building 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 22- Losa Elevada e < 0.6m
2610 Suministro en Primary Crusher Building 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado en Primary Crusher Building 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 23- Losa Elevada 0.6 <= e <= 1.5m
2610 Suministro en Primary Crusher Building 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado en Primary Crusher Building 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 26- Muro e<= 0.4m
2610 Suministro en Primary Crusher Building 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado en Primary Crusher Building 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 27- Muro 0.4m < e <= 1m
2610 Suministro en Primary Crusher Building 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado en Primary Crusher Building 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 28- Muro e > 1m
2610 Suministro en Primary Crusher Building 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Primary Crusher Building 15% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado en Primary Crusher Building 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 01- Cimentación Aislada, vol <8m3 - Concreto f´c =280 kg/cm2
2610 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Primary Crusher Buildin 20% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Primary Crusher Building 45% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 02- Cimentación Continua - Concreto f´c =280 kg/cm2
2610 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Primary Crusher Buildin 20% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Primary Crusher Building 45% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 03- Viga de Cimentación - Concreto f´c =280 kg/cm2
2610 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Primary Crusher Buildin 20% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Primary Crusher Building 45% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 07- Losa Cimentación e => 2m - Concreto f´c =350 kg/cm2
2610 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Primary Crusher Buildin 20% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Primary Crusher Building 45% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 09- Pedestal Sección <= 1m2 - Concreto f´c =350 kg/cm2
2610 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Primary Crusher Buildin 20% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Primary Crusher Building 35% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 10- Pedestal Sección > 1m2 - Concreto f´c =350 kg/cm2
2610 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Primary Crusher Buildin 20% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Primary Crusher Building 35% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 20- Columnas - Concreto f´c =350 kg/cm2
2610 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Primary Crusher Buildin 20% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Primary Crusher Building 35% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 21- Vigas - Concreto f´c =350 kg/cm2
2610 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Primary Crusher Buildin 20% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Primary Crusher Building 35% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 22- Losa Elevada e < 0.6m - Concreto f´c =350 kg/cm2
2610 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Primary Crusher Buildin 20% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Primary Crusher Building 35% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 23- Losa Elevada 0.6 <= e <= 1.5m - Concreto f´c =350 kg/cm2
2610 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Primary Crusher Buildin 20% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Primary Crusher Building 35% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 26- Muro e<= 0.4m - Concreto f´c =350 kg/cm2
2610 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Primary Crusher Buildin 20% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Primary Crusher Building 35% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 27- Muro 0.4m < e <= 1m - Concreto f´c =350 kg/cm2
2610 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Primary Crusher Buildin 20% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Primary Crusher Building 35% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 28- Muro e > 1m - Concreto f´c =350 kg/cm2
2610 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Primary Crusher Buildin 20% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Primary Crusher Building 35% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 40- Losa de Piso Incluye Sumidero y Sobre-espesores - Concreto f´c
2610 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Primary Crusher Buildin 20% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Primary Crusher Building 45% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 61- Solado - Concreto f´c =100 kg/cm2
2610 Colocacion de Encofrado en Primary Crusher Buildin 25% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Primary Crusher Building 30% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Primary Crusher Building 25% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 62- Relleno de Concreto Pobre - Concreto f´c =100 kg/cm2
2610 Colocacion de Encofrado en Primary Crusher Buildin 25% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Primary Crusher Building 30% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Primary Crusher Building 25% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher Building 10% CONSTRUCTEXECUTION FRONT 01

ntaje / Ejecución - Relleno estructural para muro TEM, Tmáx=4”


2610 Relleno estructural para muro TEM, Tmax=4” en Retai 100% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Muro de tierra reforzada (TEM)
2610 Muro de tierra reforzada (TEM) en Retainig Wall and 100% CONSTRUCTEXECUTION FRONT 01
ciones iguales a "0" en Bill Quantity)
ntaje / Ejecución - Relleno estructural para muro TEM, Tmáx=4”
2610 Relleno estructural para muro TEM, Tmax=4” en Retai 100% CONSTRUCTEXECUTION FRONT 01

ntaje / Ejecución - Acero Estructural Liviano (<= 30 kg/m)


2610 Pre-armado en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje y Conexion en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Acero Estructural Mediano (> 30 kg/m y <= 60 kg/m)
2610 Pre-armado en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje y Conexion en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Acero Estructural Pesado (> 60 kg/m y <= 90 kg/m)
2610 Pre-armado en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje y Conexion en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Acero Estructural Extra Pesado (> 90 kg/m y <= 150 kg/m)
2610 Pre-armado en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje y Conexion en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Acero Estructural Doble Extra Pesado (> 150 kg/m <= 300 kg/m)
2610 Pre-armado en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje y Conexion en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Acero Estructural Triple Extra Pesado (> 300 kg/m y <= 642 kg/m)
2610 Pre-armado en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje y Conexion en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Rejilla de Piso - Acero Carbono 32mm x 5mm
2610 Montaje y Conexion en Primary Crusher 80% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Baranda de acero con Guardapies
2610 Montaje y Conexion en Primary Crusher 80% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Escalera Ensamblada, incluye largueros, descansos y baranda
2610 Montaje y Conexion en Primary Crusher 80% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Estructura Ensamblada Liviana (<= 30 kg/m)
2610 Montaje y Conexion en Primary Crusher 80% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Estructura Ensamblada Mediana (> 30 kg/m y <= 60 kgf/m)
2610 Montaje y Conexion en Primary Crusher 80% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Estructura Ensamblada Pesada (> 60 kg/m y <= 90 kgf/m)
2610 Montaje y Conexion en Primary Crusher 80% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Riel Puente Grúa 85 lb/yard con colocación de rail clip en taller
2610 Montaje y Conexion en Primary Crusher 80% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01

ntaje / Ejecución - TANQUE DE AIRE CHANCADO PRIMARIO ; 4 M3 ; 1,2x3,9m ; 1000KG


2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TANQUE DE AIRE CHANCADO PRIMARIO ; 4 M3 ; 1,2x3,9m ; 1000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - COMPRESOR DE AIRE CHANCADO PRIMARIO ; 930 NM3/H @ 900 KPA ; 2,9x1,8x2 m ; 3000 KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO COMPRESOR DE AIRE ; 160 kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - COMPRESOR DE AIRE CHANCADO PRIMARIO ; 930 NM3/H @ 900 KPA ; 2,9x1,8x2 m ; 3000 KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO COMPRESOR DE AIRE ; 160 kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - SECADOR DE AIRE ; 220 NM3/H ; 0,5x0,9x1,5 m ; 250KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PRIMARY CRUSHER BUILDING AIR SUPPLY FAN, 43200 Am3/h,
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Ventilador en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje ducteria y soportacion en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PRIMARY CRUSHER BUILDING AIR SUPPLY FAN ELECTRIC MOTOR, 75 Kw
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Ventilador en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje ducteria y soportacion en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PRIMARY CRUSHER BUILDING MAKE UP AIR FILTER, 43200 Am3/h,
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Ventilador en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje ducteria y soportacion en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PRIMARY CRUSHER BUILDING VENTILATION SYSTEM DUCTWORK, 15000 KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Ventilador en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje ducteria y soportacion en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ministro, Fabricación,Montaje / Ejecución - PRIMARY CRUSHER BUILDING VENTILATION SYSTEM SUPPLY GRILLES WITH DAMPERS 12
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Ventilador en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje ducteria y soportacion en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ministro, Fabricación,Montaje / Ejecución - PRIMARY CRUSHER BUILDING VENTILATION SYSTEM SUPPLY GRILLES WITH DAMPERS 40
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Ventilador en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje ducteria y soportacion en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PRIMARY CRUSHER BUILDING MAKE UP AIR FILTER ROTARY VALVE, 300 KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Ventilador en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje ducteria y soportacion en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PRIMARY CRUSHER BUILDING MAKE UP AIR FILTER ROTARY VALVE ELECTRIC MOTOR, 1.1 kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Ventilador en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje ducteria y soportacion en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PRIMARY CRUSHER BUILDING MAKE UP AIR FILTER DISCHARGE CHUTE, 150 KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Ventilador en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje ducteria y soportacion en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PRIMARY CRUSHER BUILDING MAKE UP AIR FILTER DUST COLLECTION BAG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Ventilador en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje ducteria y soportacion en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PORTON MANTENCION EXCENTRICA 1 ; 7,7x5,7x3,6m ; 7911,09KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PORTON MANTENCION EXCENTRICA 2 ; 7,7x5,7x3,6m ; 7911,09KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - REVESTIMIENTO TOLVA RECEPCION CHANCADORA PRIMARIA 1 ; 600 T, 930 M3 ; 13x12x6m ; 70832,3KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - REVESTIMIENTO TOLVA DESCARGA CHANCADORA PRIMARIA 1 ; 600 T, 225 M3 ; 13x12x1,45m ; 40024,6KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - REVESTIMIENTO TOLVA RECEPCION CHANCADORA PRIMARIA 2 ; 600 T, 930 M3 ; 13x12x6m ; 70832,3KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - REVESTIMIENTO TOLVA DESCARGA CHANCADORA PRIMARIA 2 ; 600 T ,225 M3 ; 13x12x1,45m ; 40024,6KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - ESTRUCTURA SOPORTE EJE PRINCIPAL CHANCADORA PRIMARIA ; 100T 85T; 8,6x4,5x3,2m ; 19545,9KG Redesign i
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - SELLO SUPERIOR CHANCADO PRIMARIO 1 ; 8728,5KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - REVESTIMIENTO BOCA DESCARGA CHANCADO PRIMARIO 1 ; 18936,61KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - SELLO SUPERIOR CHANCADO PRIMARIO 2 ; 8728,5KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - REVESTIMIENTO BOCA DESCARGA CHANCADO PRIMARIO 2 ; 18936,61KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CAJON COLECTOR 1 CHATARRA MAGNETO FAJA ALIMENTADORA ; 6 M3 ; 3,4x1,99x0,65m ; 869KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CAJON COLECTOR 2 CHATARRA MAGNETO FAJA ALIMENTADORA ; 6 M3 ; 3,4x1,99x0,65m ; 869KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CAJON COLECTOR 3 CHATARRA MAGNETO FAJA ALIMENTADORA EN ESPERA ; 6 M3 ; 3,4x1,99x0,65m ; 904,2KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHUTE DE DESCARGA DE FINOS ALIMENTADOR DE FAJA 1 ; 10275,98KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHUTE ALIMENTACION FAJA SACRIFICIO ; 9910KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHUTE ALIMENTACION FAJA SACRIFICIO ; 9910KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHUTE ALIMENTACION FAJA ALIMENTADORA 1 CHANCADORA PRIMARIA ; 23000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHUTE DESCARGA FAJA ALIMENTADORA 1 CHANCADORA PRIMARIA ; 3800KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHUTE ALIMENTACION FAJA ALIMENTADORA 2 CHANCADORA PRIMARIA ; 23000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHUTE DESCARGA FAJA ALIMENTADORA 2 CHANCADORA PRIMARIA ; 3800KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - SISTEMA SUPRESOR DE POLVO DESCARGA CAMIONES CHANCADORA 1 ; 5312 TPH ; 19 kW ; 1000KG PRIMARY C
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo
ntaje / Ejecución - CAJA DE Entrega de Equipos
DISTRIBUCIÓN en Primary
SISTEMA Crusher
SUPRESOR DE POLVO10% CONSTRUCTEXECUTION
; 0,7x0,76x0,2m FRONT 01
; 100KG PRIMARY CRUSHER 1 DUMP POC
0.72 Kw,
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - DIFUSOR SISTEMA SUPRESOR DE POLVO 1 PRIMARY CRUSHER 1 TRUCK UNLOADING DUST SUPPRESSOR SYSTEM
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - DIFUSOR SISTEMA SUPRESOR DE POLVO 2 PRIMARY CRUSHER 1 TRUCK UNLOADING DUST SUPPRESSOR SYSTEM
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - DIFUSOR SISTEMA SUPRESOR DE POLVO 3 PRIMARY CRUSHER 1 TRUCK UNLOADING DUST SUPPRESSOR SYSTEM
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - DIFUSOR SISTEMA SUPRESOR DE POLVO 4 PRIMARY CRUSHER 1 TRUCK UNLOADING DUST SUPPRESSOR SYSTEM
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - SISTEMA SUPRESOR DE POLVO DESCARGA CAMIONES CHANCADORA 2 ; 19 kW ; 1000KG PRIMARY CRUSHER 2 D
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESOR DE POLVO10%
2610 Protocolo Entrega de Equipos en Primary Crusher CONSTRUCTEXECUTION
; 0,7x0,76x0,2m FRONT 01
; 100KG PRIMARY CRUSHER 2 DUMP POC
0.72 Kw,
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - DIFUSOR SISTEMA SUPRESOR DE POLVO 1 PRIMARY CRUSHER 2 TRUCK UNLOADING DUST SUPPRESSOR SYSTEM
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - DIFUSOR SISTEMA SUPRESOR DE POLVO 2 PRIMARY CRUSHER 2 TRUCK UNLOADING DUST SUPPRESSOR SYSTEM
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - DIFUSOR SISTEMA SUPRESOR DE POLVO 3 PRIMARY CRUSHER 2 TRUCK UNLOADING DUST SUPPRESSOR SYSTEM
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - DIFUSOR SISTEMA SUPRESOR DE POLVO 4 PRIMARY CRUSHER 2 TRUCK UNLOADING DUST SUPPRESSOR SYSTEM
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos Supresores de Polvo en Primary 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHANCADORA PRIMARIA 1 ; 5312 TPH
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHANCADORA PRIMARIA 1 ; 5312 TPH
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHANCADORA PRIMARIA 1 ; 5312 TPH
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHANCADORA PRIMARIA 1 ; 5312 TPH
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHANCADORA PRIMARIA 1 ; 5312 TPH
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHANCADORA PRIMARIA 1 ; 5312 TPH
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHANCADORA PRIMARIA 1 ; 5312 TPH
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHANCADORA PRIMARIA 1 ; 5312 TPH
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - UNIDAD DE LUBRICACION E HIDRAULICA CHANCADORA PRIMARIA 1 ; 3028 L
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO BOMBA DE LUBRICACION CHANCADORA PRIMARIA 1 ; 379 L/min ; 22,5kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO BOMBA STAND BY DE LUBRICACION CHANCADORA PRIMARIA 1 ; 379 L/min ; 22,5kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO BOMBA HIDRAULICA CHANCADORA PRIMARIA 1 ; 17 L/min ; 5,5kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO BOMBA STAND BY HIDRAULICA CHANCADORA PRIMARIA 1 ; 17 L/min ; 5,5kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO BOMBA LIMPIEZA ACEITE CHANCADORA PRIMARIA 1 ; 60 L/min ; 1,5kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - SISTEMA LUBRICACION ARAÑA CHANCADORA PRIMARIA 1 ; 200 L
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO SISTEMA LUBRICACION ARAÑA CHANCADORA PRIMARIA 1 ; 0.4 L/min ; 0,38kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO CHANCADORA PRIMARIA 1 ; 750kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - SISTEMA SELLO POLVO CHANCADORA PRIMARIA 1
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO SISTEMA SELLO POLVO CHANCADORA PRIMARIA 1 ; 1,5kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - SISTEMA DE ENFRIAMIENTO DE ACEITE CHANCADORA PRIMARIA 1 ; 379 L/min
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO VENTILADOR 1 SISTEMA DE ENFRIAMIENTO DE ACEITE CHANCADORA PRIMARIA 1 ; 22,5kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO VENTILADOR 2 SISTEMA DE ENFRIAMIENTO DE ACEITE CHANCADORA PRIMARIA 1 ; 22,5kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - REPUESTO DE EJE PRINCIPAL CHANCADORA PRIMARIA 1 ; 77331 kg
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - SISTEMA DE POSICIONAMIENTO VERTICAL POSTE CHANCADORA PRIMARIA 1 ; 568 L
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHANCADORA PRIMARIA 2 ; 5312 TPH
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHANCADORA PRIMARIA 2 ; 5312 TPH
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHANCADORA PRIMARIA 2 ; 5312 TPH
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHANCADORA PRIMARIA 2 ; 5312 TPH
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHANCADORA PRIMARIA 2 ; 5312 TPH
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHANCADORA PRIMARIA 2 ; 5312 TPH
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHANCADORA PRIMARIA 2 ; 5312 TPH
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CHANCADORA PRIMARIA 2 ; 5312 TPH
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - UNIDAD DE LUBRICACION E HIDRAULICA CHANCADORA PRIMARIA 2 ; 3028 L
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO BOMBA DE LUBRICACION CHANCADORA PRIMARIA 2 ; 379 L/min ; 22,5kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO BOMBA STAND BY DE LUBRICACION CHANCADORA PRIMARIA 2 ; 379 L/min ; 22,5kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO BOMBA HIDRAULICA CHANCADORA PRIMARIA 2 ; 17 L/min ; 5,5kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO BOMBA STAND BY HIDRAULICA CHANCADORA PRIMARIA 2 ; 17 L/min ; 5,5kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO BOMBA LIMPIEZA ACEITE CHANCADORA PRIMARIA 2 ; 60 L/min ; 1,5kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - SISTEMA LUBRICACION ARAÑA CHANCADORA PRIMARIA 2 ; 200 L
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO SISTEMA LUBRICACION ARAÑA CHANCADORA PRIMARIA 2 ; 0.4 L/min ; 0,38kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO CHANCADORA PRIMARIA 2 ; 750kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - SISTEMA SELLO POLVO CHANCADORA PRIMARIA 2
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO SISTEMA SELLO POLVO CHANCADORA PRIMARIA 2 ; 1,5kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - SISTEMA DE ENFRIAMIENTO DE ACEITE CHANCADORA PRIMARIA 2 ; 379 L/min
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO VENTILADOR 1 SISTEMA DE ENFRIAMIENTO DE ACEITE CHANCADORA PRIMARIA 2 ; 22,5kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO VENTILADOR 2 SISTEMA DE ENFRIAMIENTO DE ACEITE CHANCADORA PRIMARIA 2 ; 22,5kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - SISTEMA DE POSICIONAMIENTO VERTICAL POSTE CHANCADORA PRIMARIA2 ; 568 L
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO VENTILADOR 2 SISTEMA DE ENFRIAMIENTO DE ACEITE CHANCADORA PRIMARIA 2 ; 22,5kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - SISTEMA DE POSICIONAMIENTO VERTICAL POSTE CHANCADORA PRIMARIA2 ; 568 L
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chancadora en Primary Crusher 50% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Unidad Lubricacion y perifericos en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - FAJA ALIMENTADORA 1 CHANCADORA PRIMARIA ; 7508 MTPH HÚMEDO ; 13x3,05x2m ; 90000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos estructurales en Primary Crushe 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos mecanicos en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chutes en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - UNIDAD HIDRAULICA FAJA ALIMENTADORA 1 CHANCADORA PRIMARIA ; 15000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos estructurales en Primary Crushe 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos mecanicos en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chutes en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO UNIDAD HIDRAULICA FAJA ALIMENTADORA 1 CHANCADORA PRIMARIA ; 150kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos estructurales en Primary Crushe 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos mecanicos en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chutes en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO UNIDAD HIDRAULICA FAJA ALIMENTADORA 1 CHANCADORA PRIMARIA ; 150kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos estructurales en Primary Crushe 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos mecanicos en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chutes en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO UNIDAD HIDRAULICA FAJA ALIMENTADORA 1 CHANCADORA PRIMARIA ; 150kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos estructurales en Primary Crushe 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos mecanicos en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chutes en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - UNIDAD ENFRIAMIENTO ACEITE HIDRAULICO FAJA ALIMENTADORA 1 CHANCADORA PRIMARIA ; 1500KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos estructurales en Primary Crushe 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos mecanicos en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chutes en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO UNIDAD ENFRIAMIENTO ACEITE HIDRAULICO FAJA ALIMENTADORA 1 CHANCADORA PRIMAR
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos estructurales en Primary Crushe 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos mecanicos en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chutes en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR HIDRAULICO 1 FAJA ALIMENTADORA 1 CHANCADORA PRIMARIA ; 3000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos estructurales en Primary Crushe 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos mecanicos en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chutes en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR HIDRAULICO 2 FAJA ALIMENTADORA 1 CHANCADORA PRIMARIA ; 3000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos estructurales en Primary Crushe 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos mecanicos en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chutes en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - FAJA ALIMENTADORA 2 CHANCADORA PRIMARIA ; 7508 MTPH HÚMEDO ; 13x3,05x2m ; 90000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos estructurales en Primary Crushe 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos mecanicos en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chutes en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - UNIDAD HIDRAULICA FAJA ALIMENTADORA 2 CHANCADORA PRIMARIA ; 15000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos estructurales en Primary Crushe 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos mecanicos en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chutes en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO UNIDAD HIDRAULICA FAJA ALIMENTADORA 2 CHANCADORA PRIMARIA ; 150kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos estructurales en Primary Crushe 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos mecanicos en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chutes en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO UNIDAD HIDRAULICA FAJA ALIMENTADORA 2 CHANCADORA PRIMARIA ; 150kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos estructurales en Primary Crushe 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos mecanicos en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chutes en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO UNIDAD HIDRAULICA FAJA ALIMENTADORA 2 CHANCADORA PRIMARIA ; 150kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos estructurales en Primary Crushe 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos mecanicos en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chutes en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - UNIDAD ENFRIAMIENTO ACEITE HIDRAULICO FAJA ALIMENTADORA 2 CHANCADORA PRIMARIA ; 5 kW ; 1500KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos estructurales en Primary Crushe 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos mecanicos en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chutes en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR HIDRAULICO 1 FAJA ALIMENTADORA 2 CHANCADORA PRIMARIA ; 3000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos estructurales en Primary Crushe 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos mecanicos en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chutes en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR HIDRAULICO 2 FAJA ALIMENTADORA 2 CHANCADORA PRIMARIA ; 3000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos estructurales en Primary Crushe 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje elementos mecanicos en Primary Crusher 30% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Chutes en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PUENTE GRUA CHANCADO PRIMARIO ; 85 T/ 20 T ; 14x7,9x3,2m ; 110 kW ; 42000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Instalacion Rieles y Vigas Puente en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Polipastos, Ganchos, Motores en Primary C 30% CONSTRUCTEXECUTION FRONT 01
2610 Inst. Electrificacion en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PUENTE GRUA DE MANTENCION MOTOR Y CONTRAEJE CHANCADO PRIMARIO ; 15 T ; 15,2m ; 30 kW ; 2100KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Instalacion Rieles y Vigas Puente en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Polipastos, Ganchos, Motores en Primary C 30% CONSTRUCTEXECUTION FRONT 01
2610 Inst. Electrificacion en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - POLIPASTO ELECTRICO POLEA COLA FAJA SACRIFICIO ; 10 T ; 2,27x1,275x1,16m ; 7,5kW ; 1000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje en sitio Polipastos y Gruas Pescantes en Pr 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - POLIPASTO ELECTRICO POLEA COLA FAJA OVERLAND ; 20 T ; 1,2x2,05x1,1m ; 10 kW ; 1300KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje en sitio Polipastos y Gruas Pescantes en Pr 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - POLIPASTO ELECTRICO POLEAS FAJAS ALIMENTADORAS ; 12.5 T ; 2,27x1,275x1,16m ; 7,5kW ; 1000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje en sitio Polipastos y Gruas Pescantes en Pr 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - ELEVADOR EDIFICIO CHANCADORA PRIMARIA ; 1 T ; 25 kW ; 2500KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Rieles Rodado, Cables, Contrapeso en Prim 20% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Elevador en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - SISTEMA COLECTOR DE POLVO CHANCADO PRIMARIO ; 44,500 Am3/h (26,200 ACFM) ; 7x6x7m ; 50000KG 49,02
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Colector de Polvo en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Elevador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - DUCTOS SISTEMA COLECTOR DE POLVO CHANCADORA PRIMARIA ; 50000KG 14000 KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Colector de Polvo en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Elevador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - VENTILADOR SISTEMA COLECTOR DE POLVO CHANCADORA PRIMARIA ; 44,500 Am3/h (26,200 ACFM) ; 4000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Colector de Polvo en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Elevador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO VENTILADOR SISTEMA COLECTOR DE POLVO CHANCADORA PRIMARIA ; 90 (C) kW ; 4000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Colector de Polvo en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Elevador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - VALVULA ROTATORIA SISTEMA COLECTOR DE POLVO CHANCADO PRIMARIO ; 200KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Colector de Polvo en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Elevador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO VALVULA ROTATORIA SISTEMA COLECTOR DE POLVO CHANCADO PRIMARIO ; 7,5kW 1.5 kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Colector de Polvo en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Elevador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PRIMARY CRUSHER DUST COLLECTOR SYSTEM DUCTWORK (FILTER AND FAN CONNECTION), 1500 KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Colector de Polvo en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Elevador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PRIMARY CRUSHER DUST COLLECTOR SYSTEM DAMPER AND HOOD FOR CONNECTION TO FE-001 DISCHARGE CH
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Colector de Polvo en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Elevador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PRIMARY CRUSHER DUST COLLECTOR SYSTEM DAMPER AND HOOD FOR CONNECTION TO FE-001 DISCHARGE CH
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Colector de Polvo en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Elevador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PRIMARY CRUSHER DUST COLLECTOR SYSTEM DAMPER FOR CONNECTION 1 TO SACRIFICE BELT SKIRBOARD
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Colector de Polvo en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Elevador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PRIMARY CRUSHER DUST COLLECTOR SYSTEM DAMPER FOR CONNECTION 2 TO SACRIFICE BELT SKIRBOARD
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Colector de Polvo en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Elevador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PRIMARY CRUSHER DUST COLLECTOR SYSTEM DAMPER FOR CONNECTION TO FE-002 DISCHARGE CHUTE
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Colector de Polvo en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Elevador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PRIMARY CRUSHER DUST COLLECTOR SYSTEM DAMPER FOR CONNECTION 3 TO SACRIFICE BELT SKIRBOARD
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Colector de Polvo en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Elevador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PRIMARY CRUSHER DUST COLLECTOR SYSTEM DAMPER FOR CONNECTION 4 TO SACRIFICE BELT SKIRBOARD
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Colector de Polvo en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Elevador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ministro, Fabricación,Montaje / Ejecución - PRIMARY CRUSHER DUST COLLECTOR SYSTEM STACK, ø1070, H=19 m, 1700 KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Colector de Polvo en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Elevador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - COMPUERTA DE LANZAS FAJA ALIMENTADORA 1 CHANCADORA PRIMARIA ; 3000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Sistema de Lanzas en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - UNIDAD HIDRAULICA COMPUERTA DE LANZAS FAJA ALIMENTADORA 1 CHANCADORA PRIMARIA ; 1000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Sistema de Lanzas en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - COMPUERTA DE LANZAS FAJA ALIMENTADORA 2 CHANCADORA PRIMARIA ; 3000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Sistema de Lanzas en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CARRO MONORIEL 1 COMPUERTA DE LANZAS FAJA ALIMENTADORA 1 ; 0,55kW ; 3000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Sistema de Lanzas en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CARRO MONORIEL 2 COMPUERTA DE LANZAS FAJA ALIMENTADORA 1 ; 0,55kW ; 3000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Sistema de Lanzas en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CARRO MONORIEL 1 COMPUERTA DE LANZAS FAJA ALIMENTADORA 2 ; 0,55kW ; 3000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Sistema de Lanzas en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CARRO MONORIEL 2 COMPUERTA DE LANZAS FAJA ALIMENTADORA 2 ; 0,55kW ; 3000KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Sistema de Lanzas en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MAGNETO FAJA ALIMENTADORA 1 CHANCADO PRIMARIO ; 7508 MTPH ÚMEDO ; 2,845x3,81x1,625m ; 30 kW ; 5
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Magneto en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PANEL DE CONTROL (INC. RECTIFICADOR) MAGNETO FAJA ALIMENTADORA 1 CHANCADO PRIMARIO
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Magneto en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CARRO MAGNETO FAJA ALIMENTADORA 1 CHANCADO PRIMARIO ; 30 T ; 2,5 kW ; 1800KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Magneto en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - UNIDAD DE ENFRIAMIENTO MAGNETO FAJA ALIMENTADORA 1 CHANCADO PRIMARIO ; 1,5 kW ; 1500KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Magneto en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MAGNETO FAJA ALIMENTADORA 2 CHANCADO PRIMARIO ; 7508 MTPH ÚMEDO ; 1,625x1,981x0,838m ; 30 kW ;
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Magneto en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PANEL DE CONTROL (INC. RECTIFICADOR) MAGNETO FAJA ALIMENTADORA 2 CHANCADO PRIMARIO
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Magneto en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CARRO MAGNETO FAJA ALIMENTADORA 2 CHANCADO PRIMARIO ; 30 T ; 2,5 kW ; 1800KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Magneto en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PICA ROCA CHANCADORA 1 ; 12x1,9x1,9m ; 12500KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Picarrocas en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - UNIDAD HIDRAULICA PICA ROCA ; 1,42x0,9x1,67m ; 600KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Picarrocas en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO UNIDAD HIDRAULICA PICA ROCA ; 95 kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Picarrocas en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - PICA ROCA CHANCADORA 2 ; 12x1,9x1,9m ; 12500KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Picarrocas en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - UNIDAD HIDRAULICA PICA ROCA ; 1,42x0,9x1,67m ; 600KG
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Picarrocas en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR ELECTRICO UNIDAD HIDRAULICA PICA ROCA ; 95 kW
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje Picarrocas en Primary Crusher 60% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion Primary Crus 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01

bricate - Handling of pipe PIPE XS SMLS STL A106-B, NPS 1.00", Schedule SCH XS
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
bricate - Handling of pipe PIPE XS SMLS STL A106-B, NPS 1.50", Schedule SCH XS
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
bricate - Handling of pipe PIPE XS WELDED STL A53-F GALV T&C, NPS 1.00", Schedule SCH XS
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
bricate - Handling of pipe PIPE XS WELDED STL A53-F GALV T&C, NPS 1.50", Schedule SCH XS
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of pipe PIPE XS SMLS STL A106-B, NPS 1.00", Schedule SCH XS
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of pipe PIPE XS SMLS STL A106-B, NPS 1.50", Schedule SCH XS
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of pipe PIPE XS WELDED STL A53-F GALV T&C, NPS 1.00", Schedule SCH XS
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of pipe PIPE XS WELDED STL A53-F GALV T&C, NPS 1.50", Schedule SCH XS
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of 2 LUG UNIVERSAL HOSE COUPLING QUICK ACTING FNPT, NPS 0.75", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of BA-04: BALL 1500 WOG SCRD CS RTFE 2-P HO, NPS 0.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of BA-08: BALL 1000 CWP SCRD SS RTFE 2-P HO, NPS 0.75", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of BA-08: BALL 1000 CWP SCRD SS RTFE 2-P HO, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of BA-08: BALL 1000 CWP SCRD SS RTFE 2-P HO, NPS 1.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of BA-08: BALL 1000 CWP SCRD SS RTFE 2-P HO, NPS 0.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of BA-16: BALL 600# SCRD CS PTFE HO, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of BA-16: BALL 600# SCRD CS PTFE HO, NPS 1.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of CAP 300# SCRD GALV MI A197, NPS 1.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of COUPLING 300# SCRD MI A197, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of COUPLING 300# SCRD MI A197, NPS 1.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of COUPLING REDUCING 300# SCRD MI A197, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of ELL 45 DEG 300# SCRD MI A197, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of ELL 90 DEG 300# SCRD GALV MI A197, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of ELL 90 DEG 300# SCRD GALV MI A197, NPS 1.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of ELL 90 DEG 300# SCRD MI A197, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of ELL 90 DEG 300# SCRD MI A197, NPS 1.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of FLG SCRD 150# RF GALV STL A105, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of FLG SCRD 150# RF GALV STL A105, NPS 1.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of FLG SCRD 150# RF STL A105, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of FLG SCRD 150# RF STL A105, NPS 1.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of GL-03: GLOBE 800# SCRD CS F6/STEL HO, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of NIPPLE XS GALV STL A106-B TBE 4" LONG, NPS 0.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of NIPPLE XS GALV STL A106-B TBE 4" LONG, NPS 0.75", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of NIPPLE XS GALV STL A106-B TBE 4" LONG, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of NIPPLE XS STL A106-B PBE 3" LONG, NPS 0.75", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of NIPPLE XS STL A106-B PBE 3" LONG, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of NIPPLE XS STL A106-B TBE 3" LONG, NPS 0.75", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of NIPPLE XS STL A106-B TBE 3" LONG, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of NIPPLE XS STL A106-B TBE 4" LONG, NPS 0.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of NIPPLE XS STL A106-B TBE 4" LONG, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of PLUG SQ HEAD 300# SCRD MI A197, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of PLUG SQUARE HEAD SCRD GALV MI A197, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of REDUCER 1.5x2 300# SCRD GALV MI A197, NPS 1.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of SWAGE CONC 1.5x1 XS STL A234 WPB TBE, NPS 1.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of TEE 300# SCRD GALV MI A197, NPS 1.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of TEE 300# SCRD GALV MI A197, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of TEE 300# SCRD MI A197, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of TEE RED 1.5x1 300# SCRD MI A197, NPS 1.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of LUG 4 LUG UNIVERSAL HOSE COUPLING QUICK ACTING FNPT SS, NPS 1.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of NIPPLE SCH 40S 316/316L SS PBE 4" LONG, NPS 1.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
bricate - Butt Weld / Slip-on SS, NPS 1.00", Schedule SCH XS
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
bricate - Butt Weld / Slip-on CS, NPS 12.00", Schedule SCH10S
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
bricate - Butt Weld / Slip-on SS, NPS 2.00", Schedule SCH XS
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
bricate - Butt Weld / Slip-on CS, NPS 3.00", Schedule SCH10S
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
bricate - Butt Weld / Slip-on SS, NPS 3.00", Schedule SCH STD
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
bricate - Butt Weld / Slip-on SS, NPS 4.00", Schedule SCH STD
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
bricate - Butt Weld / Slip-on CS, NPS 6.00", Schedule SCH10S
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
bricate - Butt Weld / Slip-on SS, NPS 6.00", Schedule SCH STD
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
bricate - Socket Weld CS, NPS 1.00", Schedule SCH STD
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
bricate - Socket Weld CS, NPS 1.50", Schedule SCH STD
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
bricate - Socket Weld SS, NPS 2.00", Schedule SCH40S
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 3.00", Schedule SCH10S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 4.00", Schedule SCH10S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 10.00", Schedule SCH10S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 18.00", Schedule SCH10S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 0.75", Schedule SCH40S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 20.00", Schedule SCH STD
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 0.50", Schedule SCH80S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 0.75", Schedule SCH80S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 1.00", Schedule SCH80S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 2.00", Schedule SCH80S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 6.00", Schedule SCH STD
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 8.00", Schedule SCH STD
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 12.00", Schedule SCH STD
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 1.00", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 1.50", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 2.00", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 3.00", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 4.00", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 6.00", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HYDROSTATIC of PIPE XS SMLS STL A106-B, NPS 1.00", Schedule SCH XS
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HYDROSTATIC of PIPE XS SMLS STL A106-B, NPS 1.50", Schedule SCH XS
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HYDROSTATIC of PIPE XS WELDED STL A53-F GALV T&C, NPS 1.00", Schedule SCH XS
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HYDROSTATIC of PIPE XS WELDED STL A53-F GALV T&C, NPS 1.50", Schedule SCH XS
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E BE, NPS 12.00", Schedule SCH STD
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E BE, NPS 3.00", Schedule SCH STD
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E BE, NPS 4.00", Schedule SCH STD
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E BE, NPS 6.00", Schedule SCH STD
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HYDROSTATIC of PIPE XS SMLS STL A106-B, NPS 2.00", Schedule SCH XS
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HYDROSTATIC of PIPE XS WELDED STL A53-F GALV T&C, NPS 2.00", Schedule SCH XS
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HYDROSTATIC of PIPE SCH 10S EFW 316/316L SS A312, NPS 3.00", Schedule SCH10S
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HYDROSTATIC of PIPE SCH 10S EFW 316/316L SS A312, NPS 6.00", Schedule SCH10S
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HYDROSTATIC of PIPE SCH 40S SMLS 316/316L SS A312, NPS 2.00", Schedule SCH40S
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of CS A106, NPS 0.75", Schedule SCH XS pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of CS A106, NPS 1.50", Schedule SCH XS pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of CS A106, NPS 2.00", Schedule SCH XS pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of CS A53, NPS 3.00", Schedule SCH STD pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of CS A53, NPS 4.00", Schedule SCH STD pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of CS A53, NPS 6.00", Schedule SCH STD pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 304, NPS 0.75", Schedule SCH40S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 304, NPS 2.00", Schedule SCH40S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 304, NPS 3.00", Schedule SCH10S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 304, NPS 4.00", Schedule SCH10S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 304, NPS 6.00", Schedule SCH10S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 304, NPS 0.50", Schedule SCH80S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 304, NPS 0.75", Schedule SCH80S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 304, NPS 1.00", Schedule SCH80S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 304, NPS 2.00", Schedule SCH80S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 316, NPS 3.00", Schedule SCH10S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 316, NPS 6.00", Schedule SCH10S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 316, NPS 3.00", Schedule SCH40S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 316, NPS 6.00", Schedule SCH40S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 316, NPS 1.00", Schedule SCH40S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 316, NPS 2.00", Schedule SCH40S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, NPS 1.00", Schedule SCH XS
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, NPS 1.50", Schedule SCH XS
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F GALV T&C, NPS 1.00", Schedule SCH XS
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F GALV T&C, NPS 1.50", Schedule SCH XS
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E BE, NPS 12.00", Schedule SCH STD
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E BE, NPS 3.00", Schedule SCH STD
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E BE, NPS 4.00", Schedule SCH STD
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E BE, NPS 6.00", Schedule SCH STD
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, NPS 2.00", Schedule SCH XS
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F GALV T&C, NPS 2.00", Schedule SCH XS
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316L SS A312, NPS 3.00", Schedule SCH10S
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316L SS A312, NPS 6.00", Schedule SCH10S
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/316L SS A312, NPS 2.00", Schedule SCH40S
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe BA-08: BALL 1000 CWP SCRD SS RTFE 2-P HO, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe BA-16: BALL 600# SCRD CS PTFE HO, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe BU-10: BUTTERFLY LUG 150 PSI CI BUNA-N HO, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe BU-12: BUTTERFLY LUG HP 150# CS BUNA-N HO, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe CAP 300# SCRD GALV MI A197, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe CH-20: CHECK DUAL PLATE 150# WAFER SS 316 SS, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe CH-30: CHECK 150# CS WAFER BUNA-N DUAL PLATE, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe COUPLING 300# SCRD MI A197, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe COUPLING REDUCING 300# SCRD MI A197, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe ELL 45 DEG STD WT STL A234 WPB, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe ELL 90 DEG 300# SCRD GALV MI A197, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe ELL 90 DEG 300# SCRD MI A197, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe ELL 90 DEG 3D STD WT CS A53 GR B BE, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe ELL 90 DEG LR STD WT STL A234 WPB, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe ELL 90 DEG LR STD WT STL A234 WPB, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe FLG BLIND 150# RF STL A105, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe FLG SCRD 150# RF GALV STL A105, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe FLG SCRD 150# RF GALV STL A105, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe FLG SCRD 150# RF STL A105, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe FLG SO 150# RF STL A105, NPS 12.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe FLG SO 150# RF STL A105, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe FLG SO 150# RF STL A105, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe FLG SO 150# RF STL A105, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe FLG SO 150# RF STL A105, NPS 8.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe GA-05: GATE 125# FF DI UL/FM HO, NPS 8.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe SOCKOLET 3x1 3000# STL A105, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe SWAGE CONC 3x2 XS STL A234 WPB TSE, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe TEE 300# SCRD MI A197, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe TEE RED 2x1 300# SCRD GALV MI A197, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe TEE RED 2x0.75 300# SCRD GALV MI A197, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe TEE RED 2x1 300# SCRD MI A197, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe TEE STD WT STL A234 WPB, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe TEE STD WT STL A234 WPB, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe THREDOLET 4x2 3000# STL A105, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe BA-10: BALL VALVE 2000 WOG SW SS RTFE 3-P HO, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe BU-22: BUTTEFLY LUG HP 150# SS 316 SS HO, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe BU-22: BUTTEFLY LUG HP 150# SS 316 SS HO, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe CAP SCH 10S 316/316L SS A403, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe COUPLING RED 300# SW 316/316L SS, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe ELL 45 DEG 3000# SW 316/316L SS, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe ELL 90 DEG 3000# SW 316/316L SS, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316L SS A403-W, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316L SS A403-W, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe FLG SO 150# RF 316/316L SS, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe FLG SW 150# RF 316/316L SS 40S BORE, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe GL-11: GLOBE 800# SW SS HO, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe NIPPLE SCH 40S 316/316L SS PBE 4" LONG, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe SOCKOLET 3X2 3000# 316/316L SS, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe SOCKOLET 6X2 3000# 316/316L SS, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe TEE 3000# SW 316/316L SS, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe RED TEE 6X3 SCH 10S 316/316L SS A403-W, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe TEE SCH 10S 316/316L SS A403-W, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe UNION 3000# SW 316/316L SS, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Butt Weld / Slip-on SS, NPS 1.00", Schedule SCH XS
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Butt Weld / Slip-on CS, NPS 3.00", Schedule SCH10S
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Butt Weld / Slip-on SS, NPS 3.00", Schedule SCH STD
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Butt Weld / Slip-on SS, NPS 4.00", Schedule SCH STD
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Butt Weld / Slip-on CS, NPS 6.00", Schedule SCH10S
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Butt Weld / Slip-on CS, NPS 1.50", Schedule SCH STD
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Butt Weld / Slip-on SS, NPS 2.00", Schedule SCH40S
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, NPS 1.00", Schedule SCH XS
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, NPS 1.50", Schedule SCH XS
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F GALV T&C, NPS 1.00", Schedule SCH XS
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F GALV T&C, NPS 1.50", Schedule SCH XS
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E BE, NPS 12.00", Schedule SCH STD
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E BE, NPS 3.00", Schedule SCH STD
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E BE, NPS 4.00", Schedule SCH STD
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E BE, NPS 6.00", Schedule SCH STD
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, NPS 2.00", Schedule SCH XS
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F GALV T&C, NPS 2.00", Schedule SCH XS
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316L SS A312, NPS 3.00", Schedule SCH10S
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316L SS A312, NPS 6.00", Schedule SCH10S
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/316L SS A312, NPS 2.00", Schedule SCH40S
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01

ntaje / Ejecución - Interruptor de nivel nuclear (With Auotmated Shutter - EV, ZSC,ZSO)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Transmisor Flujo Tipo Magnético
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Transmisor Flujo Tipo Coriolis
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Indicadores de Presión sin/con Sello
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Indicador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Indicadores de Presión Diferencial sin Sello
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Indicador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Interruptores de Presión sin/con Sello
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Transmisores de Presión sin/con Sello
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Transmisores de Presión Diferencial con Sello y capilar
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Transmisor de Nivel Celdas de Flotación
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Transmisor de Nivel Tipo Ultrasónico 1” NPT
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Transmisor de Nivel Tipo Radar Flanged
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Interruptor de Nivel Vibratorio
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Sensor Temperatura
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Sensor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Transmisor de Temperatura
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Indicador de Temperatura Local (Termómetro)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Indicador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Indicadores Remotos
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Indicador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Semáforos
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Semaforo en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Sirena (Horn)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Sirena en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Baliza (Beacon)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Baliza en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Sensor/Interruptor de Velocidad
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Sensor/Transmisor de Vibración
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Sensor transmision de posicion
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Detectores de Camiones
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Detector en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Interruptor de posición cerrado / abierto
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Cámara Analizador Tamaño de Roca
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Unidad de Comunicaciones y alimentación Analizador Tamaño de Rocas
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Sistema de Iluminación Cámaras Analizador Tamaño de Roca
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Detector Manga Rota
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Manifold Aire Instrumentación (AM)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Panel Paquete Mecánico Tipo # 1 (Hasta 40 kg)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Panel Paquete Mecánico Tipo # 2 (Entre 41 kg y 80 kg)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Caja de Conexionado para Válvulas
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Tablero de Alimentación para Instrumentación en Terreno
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ministro / Instalación - Suministro e Instalación Placa de Montaje Tipo 3
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ministro / Instalación - Soporte de Instalación cámaras CCTV Tipo 1
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Caja de Terreno PROFIBUS PA
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Caja de Terreno MONITOREO DE CONDICIONES
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Rack Remoto (IO Block Terreno)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Estaciones de Teléfono de Terreno
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Bocinas
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Gabinetes Comunicaciones en Terreno
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Cámaras CCTV OUTDOOR
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Gabinete CCTV Outdoor (Power & Signal)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Instalacion Laboratorio de Pruebas Instrumentación
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Bandejas de protección para tubing
2610 Metro Lineal bandeja de protección Verificada (Ruteo 20% CONSTRUCTEXECUTION FRONT 01
2610 Metro Lineal bandeja de protección Instalada y Red 60% CONSTRUCTEXECUTION FRONT 01
2610 Bandeja con protocolo 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Tubing Aire Instrumentación
2610 Metro Lineal Circuito Tubing Verificado (Ruteo y Lar 20% CONSTRUCTEXECUTION FRONT 01
2610 Metro Lineal Circuito Tubing Instalada y Red Line re 60% CONSTRUCTEXECUTION FRONT 01
2610 Lineal debidamente Etiquetado y Protocolizado 20% CONSTRUCTEXECUTION FRONT 01

ra en Bill Quantity)
ntaje / Ejecución - Excavación de Canales y Zanjas de Drenaje en Suelo Común
2610 Instalación de planchas, accesorios y pernos, extrac 100% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Túnel acero corrugado galvanizado MP152 (Modelo B101 de Prosil
2610 Instalación de planchas, accesorios y pernos, extrac 100% CONSTRUCTEXECUTION FRONT 01

ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”


2610 Suministro y Colocacion en Corrugated Tunnel at Exi 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Corrugated Tunnel at Exit Crusher Build 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”
2610 Suministro y Colocacion en Corrugated Tunnel at Exi 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Corrugated Tunnel at Exit Crusher Build 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2610 Suministro y Colocacion en Corrugated Tunnel at Exi 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Corrugated Tunnel at Exit Crusher Build 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2610 Suministro y Colocacion en Corrugated Tunnel at Exi 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Corrugated Tunnel at Exit Crusher Build 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2610 Suministro y Colocacion en Corrugated Tunnel at Exi 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Corrugated Tunnel at Exit Crusher Build 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2610 Suministro y Colocacion en Corrugated Tunnel at Exi 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Corrugated Tunnel at Exit Crusher Build 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2610 Suministro y Colocacion en Corrugated Tunnel at Exi 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Corrugated Tunnel at Exit Crusher Build 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2610 Suministro y Colocacion en Corrugated Tunnel at Exi 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Corrugated Tunnel at Exit Crusher Build 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ministro - Inserto estándar ASTM A36 Peso < 200 kg
2610 Suministro y Colocacion en Corrugated Tunnel at Exi 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Corrugated Tunnel at Exit Crusher Build 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
2610 Suministro y Colocacion en Corrugated Tunnel at Exi 50% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Corrugated Tunnel at Exit Crusher Build 10% CONSTRUCTEXECUTION FRONT 01
2610 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ministro - Mortero de nivelación cementicio sin retracción
2610 Suministro - Mortero de nivelación cementicio sin re 100% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Mortero de nivelación cementicio sin retracción
2610 Colocación de placas de Nivelación 10% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de mortero cementicio sin retracción 40% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado 50% CONSTRUCTEXECUTION FRONT 01
ministro - Mortero de nivelación epóxico
2610 Suministro - Mortero de nivelación epóxico 100% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Mortero de nivelación epóxico
2610 Colocación de placas de Nivelación 10% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de mortero epoxico 40% CONSTRUCTEXECUTION FRONT 01
2610 Puch List Completado 50% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 02- Cimentación Continua
2610 Suministro en Corrugated Tunnel at Exit Crusher Bui 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Corrugated Tunnel at Exit Crusher Buildi 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Corrugated Tunnel at Exit Crusher Build 15% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 05- Losa Cimentación e < 1m
2610 Suministro en Corrugated Tunnel at Exit Crusher Bui 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Corrugated Tunnel at Exit Crusher Buildi 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Corrugated Tunnel at Exit Crusher Build 15% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Corrugated Tunnel at Exit 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 09- Pedestal Sección <= 1m2
2610 Suministro en Corrugated Tunnel at Exit Crusher Bui 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Corrugated Tunnel at Exit Crusher Buildi 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Corrugated Tunnel at Exit Crusher Build 15% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Corrugated Tunnel at Exit 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 29- Muro Contención, Cimentación
2610 Suministro en Corrugated Tunnel at Exit Crusher Bui 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Corrugated Tunnel at Exit Crusher Buildi 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Corrugated Tunnel at Exit Crusher Build 15% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Corrugated Tunnel at Exit 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 30- Muro Contención, Muro.
2610 Suministro en Corrugated Tunnel at Exit Crusher Bui 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Corrugated Tunnel at Exit Crusher Buildi 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Corrugated Tunnel at Exit Crusher Build 15% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Corrugated Tunnel at Exit 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 40- Losa de Piso Incluye Sumidero y Sobre-espesores
2610 Suministro en Corrugated Tunnel at Exit Crusher Bui 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Corrugated Tunnel at Exit Crusher Buildi 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Corrugated Tunnel at Exit Crusher Build 15% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Corrugated Tunnel at Exit 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 42- Canaleta Ancho/Profundidad <= 2 y Profundidad
2610 Suministro en Corrugated Tunnel at Exit Crusher Bui 30% CONSTRUCTEXECUTION FRONT 01
2610 Cortado en Corrugated Tunnel at Exit Crusher Buildi 15% CONSTRUCTEXECUTION FRONT 01
2610 Doblado en Corrugated Tunnel at Exit Crusher Build 15% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Corrugated Tunnel at Exit 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 69- Cámara - Concreto f´c =210 kg/cm2
2610 Colocacion de Acero de Refuerzo en Corrugated Tunne 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Corrugated Tunnel at Exi 20% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Corrugated Tunnel at Exit Cr 35% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Corrugated Tunnel at Exit Crusher Bui 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Corrugated Tunnel at Exit Crusher Build 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Corrugated Tunnel at Exit 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 05- Losa Cimentación e < 1m - Concreto f´c =280 kg/cm2
2610 Colocacion de Acero de Refuerzo en Corrugated Tunne 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Corrugated Tunnel at Exi 20% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Corrugated Tunnel at Exit Cr 45% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Corrugated Tunnel at Exit Crusher Bui 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Corrugated Tunnel at Exit Crusher Build 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Corrugated Tunnel at Exit 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 09- Pedestal Sección <= 1m2 - Concreto f´c =280 kg/cm2
2610 Colocacion de Acero de Refuerzo en Corrugated Tunne 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Corrugated Tunnel at Exi 20% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Corrugated Tunnel at Exit Cr 35% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Corrugated Tunnel at Exit Crusher Bui 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Corrugated Tunnel at Exit Crusher Build 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Corrugated Tunnel at Exit 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 29- Muro Contención, Cimentación - Concreto f´c =280 kg/cm2
2610 Colocacion de Acero de Refuerzo en Corrugated Tunne 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Corrugated Tunnel at Exi 20% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Corrugated Tunnel at Exit Cr 35% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Corrugated Tunnel at Exit Crusher Bui 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Corrugated Tunnel at Exit Crusher Build 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Corrugated Tunnel at Exit 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 30- Muro Contención, Muro. - Concreto f´c =280 kg/cm2
2610 Colocacion de Acero de Refuerzo en Corrugated Tunne 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Corrugated Tunnel at Exi 20% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Corrugated Tunnel at Exit Cr 35% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Corrugated Tunnel at Exit Crusher Bui 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Corrugated Tunnel at Exit Crusher Build 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Corrugated Tunnel at Exit 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 40- Losa de Piso Incluye Sumidero y Sobre-espesores - Concreto f´c
2610 Colocacion de Acero de Refuerzo en Corrugated Tunne 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Corrugated Tunnel at Exi 20% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Corrugated Tunnel at Exit Cr 45% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Corrugated Tunnel at Exit Crusher Bui 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Corrugated Tunnel at Exit Crusher Build 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Corrugated Tunnel at Exit 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 42- Canaleta Ancho/Profundidad <= 2 y Profundidad <= 1.9m - Con
2610 Colocacion de Acero de Refuerzo en Corrugated Tunne 10% CONSTRUCTEXECUTION FRONT 01
2610 Colocacion de Encofrado en Corrugated Tunnel at Exi 20% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Corrugated Tunnel at Exit Cr 45% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Corrugated Tunnel at Exit Crusher Bui 10% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Corrugated Tunnel at Exit Crusher Build 5% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Corrugated Tunnel at Exit 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 61- Solado - Concreto f´c =100 kg/cm2
2610 Colocacion de Encofrado en Corrugated Tunnel at Exi 25% CONSTRUCTEXECUTION FRONT 01
2610 Vaciado de Concreto en Corrugated Tunnel at Exit Cr 30% CONSTRUCTEXECUTION FRONT 01
2610 Descimbre en Corrugated Tunnel at Exit Crusher Bui 25% CONSTRUCTEXECUTION FRONT 01
2610 Limpieza en Corrugated Tunnel at Exit Crusher Build 10% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Corrugated Tunnel at Exit 10% CONSTRUCTEXECUTION FRONT 01

ntaje / Ejecución - Rejilla de Piso - Acero Carbono 32mm x 5mm


2610 Montaje y Conexion en Corrugated Tunnel at Exit Cr 80% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Corrugated Tunnel at Exit 20% CONSTRUCTEXECUTION FRONT 01

ntaje / Ejecución - Acero Estructural Liviano (<= 30 kg/m)


2610 Pre-armado en Primary Crusher DataCenter (Only Er 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje y Conexion en Primary Crusher DataCenter 60% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher DataCente 30% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Acero Estructural Mediano (> 30 kg/m y <= 60 kg/m)
2610 Pre-armado en Primary Crusher DataCenter (Only Er 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje y Conexion en Primary Crusher DataCenter 60% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher DataCente 30% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Acero Estructural Pesado (> 60 kg/m y <= 90 kg/m)
2610 Pre-armado en Primary Crusher DataCenter (Only Er 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje y Conexion en Primary Crusher DataCenter 60% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher DataCente 30% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Rejilla de Piso - Acero Carbono 32mm x 5mm
2610 Montaje y Conexion en Primary Crusher DataCenter 80% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher DataCente 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Baranda de acero con Guardapies
2610 Montaje y Conexion en Primary Crusher DataCenter 80% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher DataCente 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Estructura Ensamblada Liviana (<= 30 kg/m)
2610 Montaje y Conexion en Primary Crusher DataCenter 80% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher DataCente 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Estructura Ensamblada Mediana (> 30 kg/m y <= 60 kgf/m)
2610 Montaje y Conexion en Primary Crusher DataCenter 80% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher DataCente 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Estructura Ensamblada Pesada (> 60 kg/m y <= 90 kgf/m)
2610 Montaje y Conexion en Primary Crusher DataCenter 80% CONSTRUCTEXECUTION FRONT 01
2610 Punch List Completado en Primary Crusher DataCente 20% CONSTRUCTEXECUTION FRONT 01

ntaje / Ejecución - Revestimiento de Techo Plancha sin Aislación


2610 Armado y Montaje en Primary Crusher DataCenter (O 70% CONSTRUCTEXECUTION FRONT 01
2610 Fijaciones en Primary Crusher DataCenter (Only Erec 20% CONSTRUCTEXECUTION FRONT 01
2610 -Protocolos de Entregas en Primary Crusher DataCent 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Revestimiento Lateral Plancha con Aislación
2610 Armado y Montaje en Primary Crusher DataCenter (O 70% CONSTRUCTEXECUTION FRONT 01
2610 Fijaciones en Primary Crusher DataCenter (Only Erec 20% CONSTRUCTEXECUTION FRONT 01
2610 -Protocolos de Entregas en Primary Crusher DataCent 10% CONSTRUCTEXECUTION FRONT 01
a en Bill Quantity)
Crusher (Excavation & Backfill Type B)

ntaje / Ejecución - Excavación Masiva en Terreno Común


2610 Excavación masiva en terreno común 100% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Excavación Masiva con Ripper
2610 Excavación masiva con ripper 100% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Excavación Masiva en Roca
2610 Excavación masiva en roca 100% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Grava de Aislación, Tmáx 1 1/2"
2610 Suministro, colocación y compactación de grava de a 100% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Relleno Masivo Clase B
2610 Relleno Masivo Clase B en Platform Earthworks Min 100% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Relleno Masivo Clase C
2610 Relleno Masivo Clase C en Platform Earthworks Min 100% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Preparación de Subrasante
2610 Perfiladura, compactación y terminación de subrasa 100% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Perfilado de Plataformas
2610 Perfiladura, compactación y terminación de platafo 100% CONSTRUCTEXECUTION FRONT 01
rmado granular para plataformas y caminos
2610 Suministro, transporte, colocación y compactación 100% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Pretil de seguridad h=0,8m
2610 Suministro, transporte, colocación y compactación de 100% CONSTRUCTEXECUTION FRONT 01

630-ER-001) (Include Sub-station)


ra en Bill Quantity)
ounding system excavation
2610 Excavación para puesta a tierra 100% CONSTRUCTEXECUTION FRONT 01
ried Conduit excavation
2610 Excavación para conductos enterrados 100% CONSTRUCTEXECUTION FRONT 01
uct Bank excavation
2610 Excavación para bancoductos 100% CONSTRUCTEXECUTION FRONT 01
Manhole excavation
2610 Excavación para manholes 100% CONSTRUCTEXECUTION FRONT 01
ghting pole foundation excavation
2610 Excavación para fundación de pararrayo 100% CONSTRUCTEXECUTION FRONT 01
ounding system backfill and compaction
2610 Relleno para puesta a tierra 100% CONSTRUCTEXECUTION FRONT 01
ried conduit backfill and compaction
2610 Relleno para conductos enterrados 100% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Duct Bank backfill and compaction
2610 Relleno de bancoductos 100% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Manhole backfill and compaction
2610 Relleno y compactación para manholes 100% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Lighting pole foundation backfill and compaction
2610 Rellno y compactación para fundación de pararrayo 100% CONSTRUCTEXECUTION FRONT 01

ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”


2630 Suministro y Colocacion en Primary Crusher Electric 50% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 10% CONSTRUCTEXECUTION FRONT 01
2630 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”
2630 Suministro y Colocacion en Primary Crusher Electric 50% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 10% CONSTRUCTEXECUTION FRONT 01
2630 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2630 Suministro y Colocacion en Primary Crusher Electric 50% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 10% CONSTRUCTEXECUTION FRONT 01
2630 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2630 Suministro y Colocacion en Primary Crusher Electric 50% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 10% CONSTRUCTEXECUTION FRONT 01
2630 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2630 Suministro y Colocacion en Primary Crusher Electric 50% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 10% CONSTRUCTEXECUTION FRONT 01
2630 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2630 Suministro y Colocacion en Primary Crusher Electric 50% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 10% CONSTRUCTEXECUTION FRONT 01
2630 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2630 Suministro y Colocacion en Primary Crusher Electric 50% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 10% CONSTRUCTEXECUTION FRONT 01
2630 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2630 Suministro y Colocacion en Primary Crusher Electric 50% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 10% CONSTRUCTEXECUTION FRONT 01
2630 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ministro - Inserto estándar ASTM A36 Peso < 200 kg
2630 Suministro y Colocacion en Primary Crusher Electric 50% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 10% CONSTRUCTEXECUTION FRONT 01
2630 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
2630 Suministro y Colocacion en Primary Crusher Electric 50% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 10% CONSTRUCTEXECUTION FRONT 01
2630 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 01- Cimentación Aislada, vol <8m3
2630 Suministro en Primary Crusher Electrical Room (2630 30% CONSTRUCTEXECUTION FRONT 01
2630 Cortado en Primary Crusher Electrical Room (2630-ER 15% CONSTRUCTEXECUTION FRONT 01
2630 Doblado en Primary Crusher Electrical Room (2630-E 15% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 03- Viga de Cimentación
2630 Suministro en Primary Crusher Electrical Room (2630 30% CONSTRUCTEXECUTION FRONT 01
2630 Cortado en Primary Crusher Electrical Room (2630-ER 15% CONSTRUCTEXECUTION FRONT 01
2630 Doblado en Primary Crusher Electrical Room (2630-E 15% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 05- Losa Cimentación e < 1m
2630 Suministro en Primary Crusher Electrical Room (2630 30% CONSTRUCTEXECUTION FRONT 01
2630 Cortado en Primary Crusher Electrical Room (2630-ER 15% CONSTRUCTEXECUTION FRONT 01
2630 Doblado en Primary Crusher Electrical Room (2630-E 15% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 09- Pedestal Sección <= 1m2
2630 Suministro en Primary Crusher Electrical Room (2630 30% CONSTRUCTEXECUTION FRONT 01
2630 Cortado en Primary Crusher Electrical Room (2630-ER 15% CONSTRUCTEXECUTION FRONT 01
2630 Doblado en Primary Crusher Electrical Room (2630-E 15% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 10- Pedestal Sección > 1m2
2630 Suministro en Primary Crusher Electrical Room (2630 30% CONSTRUCTEXECUTION FRONT 01
2630 Cortado en Primary Crusher Electrical Room (2630-ER 15% CONSTRUCTEXECUTION FRONT 01
2630 Doblado en Primary Crusher Electrical Room (2630-E 15% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 20- Columnas
2630 Suministro en Primary Crusher Electrical Room (2630 30% CONSTRUCTEXECUTION FRONT 01
2630 Cortado en Primary Crusher Electrical Room (2630-ER 15% CONSTRUCTEXECUTION FRONT 01
2630 Doblado en Primary Crusher Electrical Room (2630-E 15% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 21- Vigas
2630 Suministro en Primary Crusher Electrical Room (2630 30% CONSTRUCTEXECUTION FRONT 01
2630 Cortado en Primary Crusher Electrical Room (2630-ER 15% CONSTRUCTEXECUTION FRONT 01
2630 Doblado en Primary Crusher Electrical Room (2630-E 15% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 22- Losa Elevada e < 0.6m
2630 Suministro en Primary Crusher Electrical Room (2630 30% CONSTRUCTEXECUTION FRONT 01
2630 Cortado en Primary Crusher Electrical Room (2630-ER 15% CONSTRUCTEXECUTION FRONT 01
2630 Doblado en Primary Crusher Electrical Room (2630-E 15% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 26- Muro e<= 0.4m
2630 Suministro en Primary Crusher Electrical Room (2630 30% CONSTRUCTEXECUTION FRONT 01
2630 Cortado en Primary Crusher Electrical Room (2630-ER 15% CONSTRUCTEXECUTION FRONT 01
2630 Doblado en Primary Crusher Electrical Room (2630-E 15% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 64- Banco de Ductos Reforzado
2630 Suministro en Primary Crusher Electrical Room (2630 30% CONSTRUCTEXECUTION FRONT 01
2630 Cortado en Primary Crusher Electrical Room (2630-ER 15% CONSTRUCTEXECUTION FRONT 01
2630 Doblado en Primary Crusher Electrical Room (2630-E 15% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 69- Cámara
2630 Suministro en Primary Crusher Electrical Room (2630 30% CONSTRUCTEXECUTION FRONT 01
2630 Cortado en Primary Crusher Electrical Room (2630-ER 15% CONSTRUCTEXECUTION FRONT 01
2630 Doblado en Primary Crusher Electrical Room (2630-E 15% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 69- Cámara - Concreto f´c =210 kg/cm2
2630 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion de Encofrado en Primary Crusher Electric 20% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2630 Vaciado de Concreto en Primary Crusher Electrical R 35% CONSTRUCTEXECUTION FRONT 01
2630 Descimbre en Primary Crusher Electrical Room (2630 10% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 5% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 01- Cimentación Aislada, vol <8m3 - Concreto f´c =280 kg/cm2
2630 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion de Encofrado en Primary Crusher Electric 20% CONSTRUCTEXECUTION FRONT 01
2630 Vaciado de Concreto en Primary Crusher Electrical R 45% CONSTRUCTEXECUTION FRONT 01
2630 Descimbre en Primary Crusher Electrical Room (2630 10% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 5% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 03- Viga de Cimentación - Concreto f´c =280 kg/cm2
2630 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion de Encofrado en Primary Crusher Electric 20% CONSTRUCTEXECUTION FRONT 01
2630 Vaciado de Concreto en Primary Crusher Electrical R 45% CONSTRUCTEXECUTION FRONT 01
2630 Descimbre en Primary Crusher Electrical Room (2630 10% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 5% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 05- Losa Cimentación e < 1m - Concreto f´c =280 kg/cm2
2630 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion de Encofrado en Primary Crusher Electric 20% CONSTRUCTEXECUTION FRONT 01
2630 Vaciado de Concreto en Primary Crusher Electrical R 45% CONSTRUCTEXECUTION FRONT 01
2630 Descimbre en Primary Crusher Electrical Room (2630 10% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 5% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 09- Pedestal Sección <= 1m2 - Concreto f´c =280 kg/cm2
2630 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion de Encofrado en Primary Crusher Electric 20% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2630 Vaciado de Concreto en Primary Crusher Electrical R 35% CONSTRUCTEXECUTION FRONT 01
2630 Descimbre en Primary Crusher Electrical Room (2630 10% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 5% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 10- Pedestal Sección > 1m2 - Concreto f´c =280 kg/cm2
2630 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion de Encofrado en Primary Crusher Electric 20% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2630 Vaciado de Concreto en Primary Crusher Electrical R 35% CONSTRUCTEXECUTION FRONT 01
2630 Descimbre en Primary Crusher Electrical Room (2630 10% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 5% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 20- Columnas - Concreto f´c =280 kg/cm2
2630 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion de Encofrado en Primary Crusher Electric 20% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2630 Vaciado de Concreto en Primary Crusher Electrical R 35% CONSTRUCTEXECUTION FRONT 01
2630 Descimbre en Primary Crusher Electrical Room (2630 10% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 5% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 21- Vigas - Concreto f´c =280 kg/cm2
2630 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion de Encofrado en Primary Crusher Electric 20% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2630 Vaciado de Concreto en Primary Crusher Electrical R 35% CONSTRUCTEXECUTION FRONT 01
2630 Descimbre en Primary Crusher Electrical Room (2630 10% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 5% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 22- Losa Elevada e < 0.6m - Concreto f´c =280 kg/cm2
2630 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion de Encofrado en Primary Crusher Electric 20% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2630 Vaciado de Concreto en Primary Crusher Electrical R 35% CONSTRUCTEXECUTION FRONT 01
2630 Descimbre en Primary Crusher Electrical Room (2630 10% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 5% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 26- Muro e<= 0.4m - Concreto f´c =280 kg/cm2
2630 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion de Encofrado en Primary Crusher Electric 20% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2630 Vaciado de Concreto en Primary Crusher Electrical R 35% CONSTRUCTEXECUTION FRONT 01
2630 Descimbre en Primary Crusher Electrical Room (2630 10% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 5% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 64- Banco de Ductos Reforzado - Concreto f´c =150 kg/cm2
2630 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion de Encofrado en Primary Crusher Electric 20% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion Ductos en Primary Crusher Electrical Roo 15% CONSTRUCTEXECUTION FRONT 01
2630 Vaciado de Concreto en Primary Crusher Electrical R 30% CONSTRUCTEXECUTION FRONT 01
2630 Descimbre en Primary Crusher Electrical Room (2630 10% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 5% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 69- Base de poste de iluminacion - Concreto f´c =210 kg/cm2
2630 Colocacion de Acero de Refuerzo en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion de Encofrado en Primary Crusher Electric 20% CONSTRUCTEXECUTION FRONT 01
2630 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2630 Vaciado de Concreto en Primary Crusher Electrical R 35% CONSTRUCTEXECUTION FRONT 01
2630 Descimbre en Primary Crusher Electrical Room (2630 10% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 5% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 61- Solado - Concreto f´c =100 kg/cm2
2630 Colocacion de Encofrado en Primary Crusher Electric 25% CONSTRUCTEXECUTION FRONT 01
2630 Vaciado de Concreto en Primary Crusher Electrical R 30% CONSTRUCTEXECUTION FRONT 01
2630 Descimbre en Primary Crusher Electrical Room (2630 25% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 10% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 62- Relleno de Concreto Pobre - Concreto f´c =100 kg/cm2
2630 Colocacion de Encofrado en Primary Crusher Electric 25% CONSTRUCTEXECUTION FRONT 01
2630 Vaciado de Concreto en Primary Crusher Electrical R 30% CONSTRUCTEXECUTION FRONT 01
2630 Descimbre en Primary Crusher Electrical Room (2630 25% CONSTRUCTEXECUTION FRONT 01
2630 Limpieza en Primary Crusher Electrical Room (2630-E 10% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 10% CONSTRUCTEXECUTION FRONT 01

ntaje / Ejecución - Acero Estructural Liviano (<= 30 kg/m)


2630 Pre-armado en Primary Crusher Electrical Room (263 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje y Conexion en Primary Crusher Electrical R 60% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 30% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Acero Estructural Mediano (> 30 kg/m y <= 60 kg/m)
2630 Pre-armado en Primary Crusher Electrical Room (263 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje y Conexion en Primary Crusher Electrical R 60% CONSTRUCTEXECUTION FRONT 01
2630 Punch List Completado en Primary Crusher Electrica 30% CONSTRUCTEXECUTION FRONT 01

ntaje / Ejecución - Escalerilla portaconductores, acero galvanizado en caliente, 600x100 mm


2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Escalerilla portaconductores, acero galvanizado en caliente, 300x100 mm
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Escalerilla portaconductores, acero galvanizado en caliente, 150x100 mm
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Bandeja portaconductores, acero galvanizado en caliente, 150x100 mm
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 3/4"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 1"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 1 1/2"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 2"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 3"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 4"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Conduit a la vista, acero flexible y cubierta de PVC resistente a la radiación UV, diámetro 3/4"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Conduit directamente enterrado, acero galvanizado en caliente ANSI C80.1, diámetro 1"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Conduit en banco de ductos, PVC Schedule 40, diámetro 4"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Conduit en banco de ductos, PVC Schedule 40, diámetro 6"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de cobre, clase 25 kV, apantallado, aislamiento de XLPE, IL=100%, 350 kcmil, 1x1c+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, 350 kcmil, 1x1c+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, # 4/0 AWG, 1x3c+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, # 2/0 AWG, 1x3c+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, # 4 AWG, 1x3c+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, # 6 AWG, 1x3c+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, 500 kcmil, 1x1c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, 250 kcmil, 1x1c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 4/0 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 2/0 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 1/0 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 2 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 10 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 2 AWG, 1x3c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 4 AWG, 1x3c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x3c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 8 AWG, 1x3c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 10 AWG, 1x3c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x3c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x4c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 10 AWG, 1x4c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x4c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x5c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 14 AWG, 1x5c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multi-triada, conductor de cobre, clase 300 V, aislamiento de PVC, # 18 AWG, 1x4T (+Pantalla por triada y total)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multi-triada, conductor de cobre, clase 300 V, aislamiento de PVC, # 18 AWG, 1x8T (+Pantalla por triada y total)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 10 AWG, 1x1c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 12 AWG, 1x1c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de cobre, clase 25 kV, apantallado, aislamiento de XLPE, IL=100%, 350 kcmil, 1x1c+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de cobre, clase 25 kV, apantallado, aislamiento de XLPE, IL=100%, # 2/0 AWG, 1x3c+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de cobre, clase 25 kV, apantallado, aislamiento de XLPE, IL=100%, # 1/0 AWG, 1x3c+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de cobre, clase 25 kV, apantallado, aislamiento de XLPE, IL=100%, # 4/0 AWG, 1x3c+T+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, 350 kcmil, 1x1c+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, # 4/0 AWG, 1x3c+T+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, # 4/0 AWG, 1x3c+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, # 2/0 AWG, 1x3c+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, # 4 AWG, 1x3c+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, # 6 AWG, 1x3c+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, 500 kcmil, 1x1c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, 250 kcmil, 1x1c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 4/0 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 2/0 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 1/0 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 2 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 8 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 10 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 14 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 2 AWG, 1x3c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 4 AWG, 1x3c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x3c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 8 AWG, 1x3c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 10 AWG, 1x3c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x3c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x4c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 10 AWG, 1x4c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x4c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x5c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 14 AWG, 1x5c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 16 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 16 AWG, 1x5c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Par apantallado, conductor de cobre, Clase 300 V, aislamiento de PVC, # 16 AWG, 1x1P (+Pantalla)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Cable de Instrumentación 1x1t;# 18 AWG apantallado
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multi-triada, conductor de cobre, clase 300 V, aislamiento de PVC, # 18 AWG, 1x4T (+Pantalla por triada y total)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Multi-triada, conductor de cobre, clase 300 V, aislamiento de PVC, # 18 AWG, 1x8T (+Pantalla por triada y total)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Cable Profibus PA 1x1p;# 18 AWG, Tipo A
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Cable Profibus DP 1x1p;# 22 AWG Tipo A
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Cable Ethernet (UTP)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 12 AWG, 1x1c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Monoconductor de fuerza, cobre, aislado, clase 600 V, #8 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Ground Bar In Man Holes (Supplied and installed by Contractor)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Ground Rod 3/4"x3m (Supplied and installed by Contractor)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Conexionado Cable de Aterrizamiento 1x1c;8 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", con base horizontal, montado en poste recto ortogonal de acero galvan
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", con base horizontal, montado en estructura
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 01
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 01
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CABLE TERMINATION KIT, 1/C MCM 350, 25 KV, SHLD, SHRINKABLE, 100-133 % I.L., OUT
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 2/0, 25 KV, SHLD, 100-133 % I.L., INDOOR
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 1/0, 25 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CABLE TERMINATION KIT, 1/C MCM 350, 5 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CABLE TERMINATION KIT, 1/C AWG 4/0, 5 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 4/0, 5 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 2/0, 5 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 4, 5 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 6, 5 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, SINGLE CONDUCTOR, 1/C MCM 500, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, SINGLE CONDUCTOR, 1/C MCM 250, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 4/0, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 2/0, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 1/0, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 2, XLPE/LSZH, BLACK JACKET
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 8, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 10, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 12, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 14, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 2, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 4, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 6, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 8, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 10, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 12, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 6, XLPE/PVC, BLACK JACKET
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 10, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 12, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERMINATION OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 12,XLPE/LSZH, BLACK JACKET
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 5 x 14 AWG, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 3 X 16 AWG, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 5 X 16 AWG, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 19 X 16 AWG, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF CONTROL CABLE, 300 V, PAR, 1 X 16 AWG, INDIVIDUAL SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI TRIAD, 1 x 18 AWG INDIVIDUAL & OVERALL SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI TRIAD, 4 x 18 AWG INDIVIDUAL & OVERALL SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI TRIAD, 8 x 18 AWG INDIVIDUAL & OVERALL SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Terminal para Cable Profibus PA 1x1p;# 18 AWG, Tipo A (N° de Cables a Conectar)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Terminal para Cable Profibus DP 1x1p;# 22 AWG Tipo A (N° de Cables a Conectar)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Terminal para Cable Ethernet UTP ( n° DE Cables a conectar)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE CONDUCTOR, 1/C AWG 12, HALOGEN FREE, RED
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Estación de control local (Botonera), "Parada Emergencia / JOG", acero galvanizado, NEMA 4
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - THREE PHASE RECEPTACLE ASSEMBLY, 600 V, 63 AMP, 3 PH+G , 63 x 600 m
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - SINGLE PHASE RECEPTACLE ASSEMBLY, 600 V, 16 AMP, 1 PH+G , 16 x 600 m
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Luminaria industrial LED, montaje colgante, 113 W
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Luminaria industrial LED, montaje a cielo, 113 W
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Luminaria industrial LED, montaje en muro o columna, 113 W
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Proyector industrial LED, montaje en muro o columna, 263 W
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Proyector industrial LED, montaje en muro o columna, 531 W
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Equipo alumbrado público (1 unidad), LED, montaje en poste recto ortogonal de acero galvanizado de 9 m, 159 W
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Equipo de alumbrado de emergencia, montaje en muro o columna, 2x50 W
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Corona móvil de iluminación de 10 luminarias, montaje en poste de 30 m
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - DISTRIBUTION TRANSFORMER, 7,5 MVA, 22900/4160 V, Dyn1, KNAN, 65°C, SILICONE OIL IMMERSED (TAG No.: X
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - DISTRIBUTION TRANSFORMER, 7,5 MVA, 22900/4160 V, Dyn1, KNAN, 65°C, SILICONE OIL IMMERSED (TAG No.: X
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - DISTRIBUTION TRANSFORMER, 2,5 MVA, 22900/480 V, Dyn1, KNAN, 65°C, SILICONE OIL IMMERSED (TAG No.: XX
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - DISTRIBUTION TRANSFORMER, 250 kVA , 480/400-231 V, Dyn1, KNAN, 65°C, SILICONE OIL IMMERSED (TAG No.: X
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G, 400-231 V, 14 kA
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G, 208-120 V, 10 kA
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 2P, 125 V (dc), 5 kA
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 01
2630
BREAKER, 630 A Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
XXX-XX)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 01
BREAKER, 12002630A Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
XXX-XX)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 01
AKER, 1200 A2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
R, 400 A
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - MOTOR CONTROL CENTER, 480 V, 1200 A, 65 kA
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - BATTERY CHARGER, 400 V-125 V (dc)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - BATTERY BANK, 125 V (dc)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos
ntaje / Ejecución de pruebas
- BUSBAR DUCT, 480 V,y 3200
recepcion
A, 65finales
kA en Primar 20% CONSTRUCTEXECUTION FRONT 01
XXX)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 01
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 01
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 01
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 01

2630 Instalación de sala eléctrica 100% CONSTRUCTEXECUTION FRONT 01


a en Bill Quantity)

o Stockpile

ra en Bill Quantity)
ounding system excavation
2610 Excavación para puesta a tierra 100% CONSTRUCTEXECUTION FRONT 01
ried Conduit excavation
2610 Excavación para conductos enterrados 100% CONSTRUCTEXECUTION FRONT 01
ounding system backfill and compaction
2610 Relleno para puesta a tierra 100% CONSTRUCTEXECUTION FRONT 01
ried conduit backfill and compaction
2610 Relleno para conductos enterrados 100% CONSTRUCTEXECUTION FRONT 01

ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”


2730 Suministro y Colocacion en Sacrificial Conveyor To 50% CONSTRUCTEXECUTION FRONT 01
2730 Limpieza en Sacrificial Conveyor To Transfer Tower 10% CONSTRUCTEXECUTION FRONT 01
2730 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”
2730 Suministro y Colocacion en Sacrificial Conveyor To 50% CONSTRUCTEXECUTION FRONT 01
2730 Limpieza en Sacrificial Conveyor To Transfer Tower 10% CONSTRUCTEXECUTION FRONT 01
2730 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2730 Suministro y Colocacion en Sacrificial Conveyor To 50% CONSTRUCTEXECUTION FRONT 01
2730 Limpieza en Sacrificial Conveyor To Transfer Tower 10% CONSTRUCTEXECUTION FRONT 01
2730 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2730 Suministro y Colocacion en Sacrificial Conveyor To 50% CONSTRUCTEXECUTION FRONT 01
2730 Limpieza en Sacrificial Conveyor To Transfer Tower 10% CONSTRUCTEXECUTION FRONT 01
2730 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2730 Suministro y Colocacion en Sacrificial Conveyor To 50% CONSTRUCTEXECUTION FRONT 01
2730 Limpieza en Sacrificial Conveyor To Transfer Tower 10% CONSTRUCTEXECUTION FRONT 01
2730 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2730 Suministro y Colocacion en Sacrificial Conveyor To 50% CONSTRUCTEXECUTION FRONT 01
2730 Limpieza en Sacrificial Conveyor To Transfer Tower 10% CONSTRUCTEXECUTION FRONT 01
2730 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2730 Suministro y Colocacion en Sacrificial Conveyor To 50% CONSTRUCTEXECUTION FRONT 01
2730 Limpieza en Sacrificial Conveyor To Transfer Tower 10% CONSTRUCTEXECUTION FRONT 01
2730 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2730 Suministro y Colocacion en Sacrificial Conveyor To 50% CONSTRUCTEXECUTION FRONT 01
2730 Limpieza en Sacrificial Conveyor To Transfer Tower 10% CONSTRUCTEXECUTION FRONT 01
2730 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ministro - Inserto estándar ASTM A36 Peso < 200 kg
2730 Suministro y Colocacion en Sacrificial Conveyor To 50% CONSTRUCTEXECUTION FRONT 01
2730 Limpieza en Sacrificial Conveyor To Transfer Tower 10% CONSTRUCTEXECUTION FRONT 01
2730 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ntaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
2730 Suministro y Colocacion en Sacrificial Conveyor To 50% CONSTRUCTEXECUTION FRONT 01
2730 Limpieza en Sacrificial Conveyor To Transfer Tower 10% CONSTRUCTEXECUTION FRONT 01
2730 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 05- Losa Cimentación e < 1m
2730 Suministro en Sacrificial Conveyor To Transfer Towe 30% CONSTRUCTEXECUTION FRONT 01
2730 Cortado en Sacrificial Conveyor To Transfer Tower 15% CONSTRUCTEXECUTION FRONT 01
2730 Doblado en Sacrificial Conveyor To Transfer Tower 15% CONSTRUCTEXECUTION FRONT 01
2730 Punch List Completado en Sacrificial Conveyor To T 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 09- Pedestal Sección <= 1m2
2730 Suministro en Sacrificial Conveyor To Transfer Towe 30% CONSTRUCTEXECUTION FRONT 01
2730 Cortado en Sacrificial Conveyor To Transfer Tower 15% CONSTRUCTEXECUTION FRONT 01
2730 Doblado en Sacrificial Conveyor To Transfer Tower 15% CONSTRUCTEXECUTION FRONT 01
2730 Punch List Completado en Sacrificial Conveyor To T 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 11- Durmiente
2730 Suministro en Sacrificial Conveyor To Transfer Towe 30% CONSTRUCTEXECUTION FRONT 01
2730 Cortado en Sacrificial Conveyor To Transfer Tower 15% CONSTRUCTEXECUTION FRONT 01
2730 Doblado en Sacrificial Conveyor To Transfer Tower 15% CONSTRUCTEXECUTION FRONT 01
2730 Punch List Completado en Sacrificial Conveyor To T 40% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 05- Losa Cimentación e < 1m - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Conveyor To Tr 10% CONSTRUCTEXECUTION FRONT 01
2730 Colocacion de Encofrado en Sacrificial Conveyor To 20% CONSTRUCTEXECUTION FRONT 01
2730 Vaciado de Concreto en Sacrificial Conveyor To Tran 45% CONSTRUCTEXECUTION FRONT 01
2730 Descimbre en Sacrificial Conveyor To Transfer Towe 10% CONSTRUCTEXECUTION FRONT 01
2730 Limpieza en Sacrificial Conveyor To Transfer Tower 5% CONSTRUCTEXECUTION FRONT 01
2730 Punch List Completado en Sacrificial Conveyor To T 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 09- Pedestal Sección <= 1m2 - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Conveyor To Tr 10% CONSTRUCTEXECUTION FRONT 01
2730 Colocacion de Encofrado en Sacrificial Conveyor To 20% CONSTRUCTEXECUTION FRONT 01
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2730 Vaciado de Concreto en Sacrificial Conveyor To Tran 35% CONSTRUCTEXECUTION FRONT 01
2730 Descimbre en Sacrificial Conveyor To Transfer Towe 10% CONSTRUCTEXECUTION FRONT 01
2730 Limpieza en Sacrificial Conveyor To Transfer Tower 5% CONSTRUCTEXECUTION FRONT 01
2730 Punch List Completado en Sacrificial Conveyor To T 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 11- Durmiente - Concreto f´c =280 kg/cm2 (No se encuentra en Ba
2730 Colocacion de Acero de Refuerzo en Conveyor To Tr 10% CONSTRUCTEXECUTION FRONT 01
2730 Colocacion de Encofrado en Sacrificial Conveyor To 20% CONSTRUCTEXECUTION FRONT 01
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 01
2730 Vaciado de Concreto en Sacrificial Conveyor To Tran 35% CONSTRUCTEXECUTION FRONT 01
2730 Descimbre en Sacrificial Conveyor To Transfer Towe 10% CONSTRUCTEXECUTION FRONT 01
2730 Limpieza en Sacrificial Conveyor To Transfer Tower 5% CONSTRUCTEXECUTION FRONT 01
2730 Punch List Completado en Sacrificial Conveyor To T 10% CONSTRUCTEXECUTION FRONT 01
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 61- Solado - Concreto f´c =100 kg/cm2
2730 Colocacion de Encofrado en Sacrificial Conveyor To 25% CONSTRUCTEXECUTION FRONT 01
2730 Vaciado de Concreto en Sacrificial Conveyor To Tran 30% CONSTRUCTEXECUTION FRONT 01
2730 Descimbre en Sacrificial Conveyor To Transfer Towe 25% CONSTRUCTEXECUTION FRONT 01
2730 Limpieza en Sacrificial Conveyor To Transfer Tower 10% CONSTRUCTEXECUTION FRONT 01
2730 Punch List Completado en Sacrificial Conveyor To T 10% CONSTRUCTEXECUTION FRONT 01

ntaje / Ejecución - CHUTE DESCARGA FAJA SACRIFICIO ; 14150KG


2730 Recepcion y traslado de elementos en Sacrificial Co 10% CONSTRUCTEXECUTION FRONT 01
2730 Montaje en sitio 60% CONSTRUCTEXECUTION FRONT 01
2730 Conexionado 20% CONSTRUCTEXECUTION FRONT 01
2730 Protocolo de entrega 10% CONSTRUCTEXECUTION FRONT 01
taje / Ejecución - CINTA FAJA TRANSPORTADORA DE SACRIFICIO ; FLUJO HUMEDO 10897 TPH, 2,5 % HUMEDAD ; 148x2,134x8,7m
2730 Recepcion y traslado de elementos en Sacrificial Co 10% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos estructurales en Sacrificial Con 20% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos mecanicos en Sacrificial Convey 30% CONSTRUCTEXECUTION FRONT 01
2730 Montaje Chutes en Sacrificial Conveyor To Transfer 10% CONSTRUCTEXECUTION FRONT 01
2730 Conexionado (*), Pruebas e Inspeccion en Sacrificia 20% CONSTRUCTEXECUTION FRONT 01
2730 Protocolo Entrega de Equipos en Sacrificial Conveyo 10% CONSTRUCTEXECUTION FRONT 01
taje / Ejecución - SACRIFICE BELT CONVEYOR 2730-CV-001-GALERIES
2730 Recepcion y traslado de elementos en Sacrificial Co 10% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos estructurales en Sacrificial Con 20% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos mecanicos en Sacrificial Convey 30% CONSTRUCTEXECUTION FRONT 01
2730 Montaje Chutes en Sacrificial Conveyor To Transfer 10% CONSTRUCTEXECUTION FRONT 01
2730 Conexionado (*), Pruebas e Inspeccion en Sacrificia 20% CONSTRUCTEXECUTION FRONT 01
2730 Protocolo Entrega de Equipos en Sacrificial Conveyo 10% CONSTRUCTEXECUTION FRONT 01
taje / Ejecución - SACRIFICE BELT CONVEYOR 2730-CV-001-IMPACT TABLE
2730 Recepcion y traslado de elementos en Sacrificial Co 10% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos estructurales en Sacrificial Con 20% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos mecanicos en Sacrificial Convey 30% CONSTRUCTEXECUTION FRONT 01
2730 Montaje Chutes en Sacrificial Conveyor To Transfer 10% CONSTRUCTEXECUTION FRONT 01
2730 Conexionado (*), Pruebas e Inspeccion en Sacrificia 20% CONSTRUCTEXECUTION FRONT 01
2730 Protocolo Entrega de Equipos en Sacrificial Conveyo 10% CONSTRUCTEXECUTION FRONT 01
taje / Ejecución - SACRIFICE BELT CONVEYOR 2730-CV-001-LOAD TABLE
2730 Recepcion y traslado de elementos en Sacrificial Co 10% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos estructurales en Sacrificial Con 20% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos mecanicos en Sacrificial Convey 30% CONSTRUCTEXECUTION FRONT 01
2730 Montaje Chutes en Sacrificial Conveyor To Transfer 10% CONSTRUCTEXECUTION FRONT 01
2730 Conexionado (*), Pruebas e Inspeccion en Sacrificia 20% CONSTRUCTEXECUTION FRONT 01
2730 Protocolo Entrega de Equipos en Sacrificial Conveyo 10% CONSTRUCTEXECUTION FRONT 01
taje / Ejecución - SACRIFICE BELT CONVEYOR 2730-CV-001-TAIL FRAME SYSTEM
2730 Recepcion y traslado de elementos en Sacrificial Co 10% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos estructurales en Sacrificial Con 20% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos mecanicos en Sacrificial Convey 30% CONSTRUCTEXECUTION FRONT 01
2730 Montaje Chutes en Sacrificial Conveyor To Transfer 10% CONSTRUCTEXECUTION FRONT 01
2730 Conexionado (*), Pruebas e Inspeccion en Sacrificia 20% CONSTRUCTEXECUTION FRONT 01
2730 Protocolo Entrega de Equipos en Sacrificial Conveyo 10% CONSTRUCTEXECUTION FRONT 01
taje / Ejecución - SACRIFICE BELT CONVEYOR 2730-CV-001-MISCELLANEOUS_TAKE-UP ASSEMBLY
2730 Recepcion y traslado de elementos en Sacrificial Co 10% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos estructurales en Sacrificial Con 20% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos mecanicos en Sacrificial Convey 30% CONSTRUCTEXECUTION FRONT 01
2730 Montaje Chutes en Sacrificial Conveyor To Transfer 10% CONSTRUCTEXECUTION FRONT 01
2730 Conexionado (*), Pruebas e Inspeccion en Sacrificia 20% CONSTRUCTEXECUTION FRONT 01
2730 Protocolo Entrega de Equipos en Sacrificial Conveyo 10% CONSTRUCTEXECUTION FRONT 01
taje / Ejecución - SACRIFICE BELT CONVEYOR 2730-CV-001-MISCELLANEOUS_COUNTERWEIGHT ASSEMBLY
2730 Recepcion y traslado de elementos en Sacrificial Co 10% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos estructurales en Sacrificial Con 20% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos mecanicos en Sacrificial Convey 30% CONSTRUCTEXECUTION FRONT 01
2730 Montaje Chutes en Sacrificial Conveyor To Transfer 10% CONSTRUCTEXECUTION FRONT 01
2730 Conexionado (*), Pruebas e Inspeccion en Sacrificia 20% CONSTRUCTEXECUTION FRONT 01
2730 Protocolo Entrega de Equipos en Sacrificial Conveyo 10% CONSTRUCTEXECUTION FRONT 01
taje / Ejecución - SACRIFICE BELT CONVEYOR 2730-CV-001-MISCELLANEOUS_Transfer Tower
2730 Recepcion y traslado de elementos en Sacrificial Co 10% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos estructurales en Sacrificial Con 20% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos mecanicos en Sacrificial Convey 30% CONSTRUCTEXECUTION FRONT 01
2730 Montaje Chutes en Sacrificial Conveyor To Transfer 10% CONSTRUCTEXECUTION FRONT 01
2730 Conexionado (*), Pruebas e Inspeccion en Sacrificia 20% CONSTRUCTEXECUTION FRONT 01
2730 Protocolo Entrega de Equipos en Sacrificial Conveyo 10% CONSTRUCTEXECUTION FRONT 01
taje / Ejecución - REDUCTOR FAJA DE SACRIFICIO
2730 Recepcion y traslado de elementos en Sacrificial Co 10% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos estructurales en Sacrificial Con 20% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos mecanicos en Sacrificial Convey 30% CONSTRUCTEXECUTION FRONT 01
2730 Montaje Chutes en Sacrificial Conveyor To Transfer 10% CONSTRUCTEXECUTION FRONT 01
2730 Conexionado (*), Pruebas e Inspeccion en Sacrificia 20% CONSTRUCTEXECUTION FRONT 01
2730 Protocolo Entrega de Equipos en Sacrificial Conveyo 10% CONSTRUCTEXECUTION FRONT 01
taje / Ejecución - MOTOR VENTILADOR UNIDAD MOTRIZ FAJA TRANSPORTADORA DE SACRIFICIO ; 3,6kW
2730 Recepcion y traslado de elementos en Sacrificial Co 10% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos estructurales en Sacrificial Con 20% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos mecanicos en Sacrificial Convey 30% CONSTRUCTEXECUTION FRONT 01
2730 Montaje Chutes en Sacrificial Conveyor To Transfer 10% CONSTRUCTEXECUTION FRONT 01
2730 Conexionado (*), Pruebas e Inspeccion en Sacrificia 20% CONSTRUCTEXECUTION FRONT 01
2730 Protocolo Entrega de Equipos en Sacrificial Conveyo 10% CONSTRUCTEXECUTION FRONT 01
taje / Ejecución - CALEFACTOR UNIDAD MOTRIZ FAJA TRANSPORTADORA DE SACRIFICIO ; 5,25kW
2730 Recepcion y traslado de elementos en Sacrificial Co 10% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos estructurales en Sacrificial Con 20% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos mecanicos en Sacrificial Convey 30% CONSTRUCTEXECUTION FRONT 01
2730 Montaje Chutes en Sacrificial Conveyor To Transfer 10% CONSTRUCTEXECUTION FRONT 01
2730 Conexionado (*), Pruebas e Inspeccion en Sacrificia 20% CONSTRUCTEXECUTION FRONT 01
2730 Protocolo Entrega de Equipos en Sacrificial Conveyo 10% CONSTRUCTEXECUTION FRONT 01
taje / Ejecución - MOTOR BOMBA ACEITE UNIDAD MOTRIZ FAJA TRANSPORTADORA DE SACRIFICIO ; 5,36kW
2730 Recepcion y traslado de elementos en Sacrificial Co 10% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos estructurales en Sacrificial Con 20% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos mecanicos en Sacrificial Convey 30% CONSTRUCTEXECUTION FRONT 01
2730 Montaje Chutes en Sacrificial Conveyor To Transfer 10% CONSTRUCTEXECUTION FRONT 01
2730 Conexionado (*), Pruebas e Inspeccion en Sacrificia 20% CONSTRUCTEXECUTION FRONT 01
2730 Protocolo Entrega de Equipos en Sacrificial Conveyo 10% CONSTRUCTEXECUTION FRONT 01
taje / Ejecución - DETECTOR DE METALES EN FAJA DE SACRIFICIO ; 2,2kW
2730 Recepcion y traslado de elementos en Sacrificial Co 10% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos estructurales en Sacrificial Con 20% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos mecanicos en Sacrificial Convey 30% CONSTRUCTEXECUTION FRONT 01
2730 Montaje Chutes en Sacrificial Conveyor To Transfer 10% CONSTRUCTEXECUTION FRONT 01
2730 Conexionado (*), Pruebas e Inspeccion en Sacrificia 20% CONSTRUCTEXECUTION FRONT 01
2730 Protocolo Entrega de Equipos en Sacrificial Conveyo 10% CONSTRUCTEXECUTION FRONT 01
taje / Ejecución - MOTOR ELECTRICO FAJA DE SACRIFICIO ; 700kW
2730 Recepcion y traslado de elementos en Sacrificial Co 10% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos estructurales en Sacrificial Con 20% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos mecanicos en Sacrificial Convey 30% CONSTRUCTEXECUTION FRONT 01
2730 Montaje Chutes en Sacrificial Conveyor To Transfer 10% CONSTRUCTEXECUTION FRONT 01
2730 Conexionado (*), Pruebas e Inspeccion en Sacrificia 20% CONSTRUCTEXECUTION FRONT 01
2730 Protocolo Entrega de Equipos en Sacrificial Conveyo 10% CONSTRUCTEXECUTION FRONT 01
taje / Ejecución - MOTOR CREEP DRIVE PARA FAJA TRANSPORTADORA DE SACRIFICIO ; 25kW
2730 Recepcion y traslado de elementos en Sacrificial Co 10% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos estructurales en Sacrificial Con 20% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos mecanicos en Sacrificial Convey 30% CONSTRUCTEXECUTION FRONT 01
2730 Montaje Chutes en Sacrificial Conveyor To Transfer 10% CONSTRUCTEXECUTION FRONT 01
2730 Conexionado (*), Pruebas e Inspeccion en Sacrificia 20% CONSTRUCTEXECUTION FRONT 01
2730 Protocolo Entrega de Equipos en Sacrificial Conveyo 10% CONSTRUCTEXECUTION FRONT 01
taje / Ejecución - TORRE DE TRANSFERENCIA FAJA DE SACRIFICIO
2730 Recepcion y traslado de elementos en Sacrificial Co 10% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos estructurales en Sacrificial Con 20% CONSTRUCTEXECUTION FRONT 01
2730 Montaje elementos mecanicos en Sacrificial Convey 30% CONSTRUCTEXECUTION FRONT 01
2730 Montaje Chutes en Sacrificial Conveyor To Transfer 10% CONSTRUCTEXECUTION FRONT 01
2730 Conexionado (*), Pruebas e Inspeccion en Sacrificia 20% CONSTRUCTEXECUTION FRONT 01
2730 Protocolo Entrega de Equipos en Sacrificial Conveyo 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - ELECTRIC HOIST SACRIFICE CONVEYOR SPOON CHUTE
2730 Recepcion y traslado de elementos en Sacrificial Co 10% CONSTRUCTEXECUTION FRONT 01
2730 Montaje en sitio 60% CONSTRUCTEXECUTION FRONT 01
2730 Conexionado 20% CONSTRUCTEXECUTION FRONT 01
2730 Protocolo de entrega 10% CONSTRUCTEXECUTION FRONT 01

bricate - Handling of pipe PIPE XS SMLS STL A106-B, NPS 1.00", Schedule SCH XS
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
bricate - Handling of pipe PIPE XS WELDED STL A53-F GALV T&C, NPS 1.50", Schedule SCH XS
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of pipe PIPE XS SMLS STL A106-B, NPS 1.00", Schedule SCH XS
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of pipe PIPE XS WELDED STL A53-F GALV T&C, NPS 1.50", Schedule SCH XS
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of 2 LUG UNIVERSAL HOSE COUPLING QUICK ACTING FNPT, NPS 0.75", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of BA-16: BALL 600# SCRD CS PTFE HO, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of COUPLING REDUCING 300# SCRD MI A197, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of FLG SCRD 150# RF STL A105, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of NIPPLE XS STL A106-B TBE 3" LONG, NPS 0.75", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of NIPPLE XS STL A106-B TBE 3" LONG, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of NIPPLE XS STL A106-B TBE 4" LONG, NPS 0.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of LUG 4 LUG UNIVERSAL HOSE COUPLING QUICK ACTING FNPT SS, NPS 1.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Handling of NIPPLE SCH 40S 316/316L SS PBE 4" LONG, NPS 1.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
bricate - Socket Weld CS, NPS 1.50", Schedule SCH STD
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
bricate - Socket Weld SS, NPS 2.00", Schedule SCH40S
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 3.00", Schedule SCH40S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 3.00", Schedule SCH STD
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 4.00", Schedule SCH STD
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - RT, NPS 14.00", Schedule SCH STD
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HYDROSTATIC of PIPE XS SMLS STL A106-B, NPS 1.00", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HYDROSTATIC of PIPE XS WELDED STL A53-F GALV T&C, NPS 1.50", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HYDROSTATIC of PIPE XS SMLS STL A106-B, NPS 2.00", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HYDROSTATIC of PIPE SCH 40S SMLS 316/316L SS A312, NPS 2.00", Schedule SCH40S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 304, NPS 0.75", Schedule SCH80S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 304, NPS 2.00", Schedule SCH80S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 316, NPS 3.00", Schedule SCH10S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 316, NPS 6.00", Schedule SCH10S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 316, NPS 3.00", Schedule SCH40S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Double handling of SS 316, NPS 6.00", Schedule SCH40S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, NPS 1.00", Schedule SCH XS
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F GALV T&C, NPS 1.50", Schedule SCH XS
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, NPS 2.00", Schedule SCH XS
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/316L SS A312, NPS 2.00", Schedule SCH40S
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe ELL 90 DEG 300# SCRD MI A197, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe TEE RED 2x1 300# SCRD MI A197, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe BA-10: BALL VALVE 2000 WOG SW SS RTFE 3-P HO, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe ELL 90 DEG 3000# SW 316/316L SS, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316L SS A403-W, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe FLG BLIND 150# RF 316/316L SS, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe FLG SW 150# RF 316/316L SS 40S BORE, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe GL-11: GLOBE 800# SW SS HO, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe NIPPLE SCH 40S 316/316L SS PBE 4" LONG, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe SOCKOLET 3X2 3000# 316/316L SS, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe UNION 3000# SW 316/316L SS, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Butt Weld / Slip-on CS, NPS 1.50", Schedule SCH STD
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - Butt Weld / Slip-on SS, NPS 2.00", Schedule SCH40S
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, NPS 1.00", Schedule SCH XS
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F GALV T&C, NPS 1.50", Schedule SCH XS
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, NPS 2.00", Schedule SCH XS
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/316L SS A312, NPS 2.00", Schedule SCH40S
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 01
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 01
tall / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/316L SS A312, NPS 2.00", Schedule SCH40S

ntaje / Ejecución - Interruptor de nivel nuclear


2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Indicadores de Presión sin/con Sello
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Indicador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Interruptores de Presión sin/con Sello
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Sensor Temperatura
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Sensor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Transmisor de Temperatura
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Sirena (Horn)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Sirena en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Baliza (Beacon)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Baliza en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Interruptor de Desalineamiento Faja
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Interruptor de Seguridad tipo Pull Cord
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Interruptor de Corte de Faja Mecánico
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Sensor/Transmisor de Velocidad
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Sensor/Transmisor de Vibración
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Interruptor posición contrapeso fajas
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Interruptor posición carro repartidor
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Tipo de radar de interruptor de nivel
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Cámara Analizador Tamaño de Roca
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Unidad de Comunicaciones y alimentación Analizador Tamaño de Rocas
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Sistema de Iluminación Cámaras Analizador Tamaño de Roca
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Transmisor detector de metales
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Panel Paquete Mecánico Tipo # 1 (Hasta 40 kg)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ntaje / Ejecución - Unidad Hidraulica para Actuadores
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01
ministro / Instalación - Suministro e Instalación Placa de Montaje Tipo 3
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 01
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 01
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 01
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 01

onveyor Tunnel

ntaje / Ejecución - COMPRESOR AIRE SERVICIO OVERLAND ; 50 NM3/H@690 KPA ; 200KG


2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Compresores en Additional Works In Coars 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Acumuladores, Secadores y Filtros en Addi 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - MOTOR ELECTRICO COMPRESOR AIRE SERVICIO OVERLAND ; 10 kW ; 100KG
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Compresores en Additional Works In Coars 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Acumuladores, Secadores y Filtros en Addi 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 01 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 02 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 03 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 04 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 05 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 06 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 07 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 08 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 09 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 10 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 11 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 12 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 01 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 02 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 03 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 04 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 05 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 06 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 07 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 08 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 09 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 10 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 11 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 12 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02

tall / Perform - RT, NPS 1.50", Schedule SCH40S


2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 2.00", Schedule SCH80S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 0.50", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE SCH 40S EFW 316/316L SS A312, NPS 3.00", Schedule SCH40S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A106, NPS 0.50", Schedule SCH XS pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A106, NPS 0.75", Schedule SCH XS pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A106, NPS 1.50", Schedule SCH XS pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A106, NPS 2.00", Schedule SCH XS pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A53, NPS 3.00", Schedule SCH STD pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A53, NPS 4.00", Schedule SCH STD pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 304, NPS 6.00", Schedule SCH10S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 304, NPS 2.00", Schedule SCH80S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 316, NPS 6.00", Schedule SCH10S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 316, NPS 3.00", Schedule SCH40S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 316, NPS 6.00", Schedule SCH40S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 40S EFW 316/316L SS A312, NPS 3.00", Schedule SCH40S
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe BU-22: BUTTEFLY LUG HP 150# SS 316 SS HO, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe BU-25: BUTTERFLY LUG HP 300# SS 316 SS GO, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316L SS A403-W, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 90 LR SCH 40S 316/316SS A403-W, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe FLG SO 150# RF 316/316L SS, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe FLG WN 300# RF 316 SS 40S BORE, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 40S EFW 316/316L SS A312, NPS 3.00", Schedule SCH40S
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 3/4"
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 2"
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero flexible y cubierta de PVC resistente a la radiación UV, diámetro 3/4"
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 8 AWG, 1x3c
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x3c
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 14 AWG, 1x3c
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 16 AWG, 1x3c
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
lticonductor de control, clase 600 V, aislamiento de XLPE, # 16 AWG, 1x5c
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Par apantallado, conductor de cobre, Clase 300 V, aislamiento de PVC, # 16 AWG, 1x1P (+Pantalla)
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de Instrumentación 1x1t;# 18 AWG apantallado
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable Profibus PA 1x1p;# 18 AWG, Tipo A
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable Profibus DP 1x1p;# 22 AWG Tipo A
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 10 AWG, 1x1c
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 12 AWG, 1x1c
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Messenger cable with hardware for 22.9kV cable
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de fuerza, cobre, aislado, clase 600 V, #8 AWG
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conexionado Cable de Aterrizamiento 1x1c;8 AWG
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 4/0, 25 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado en Additional Works In Coarse Ore Co 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 2/0, XLPE/LSZH, BLACK
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado en Additional Works In Coarse Ore Co 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 14, XLPE/LSZH, BLACK
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado en Additional Works In Coarse Ore Co 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 3 X 16 AWG, XLPE/LSZH, BLACK
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado en Additional Works In Coarse Ore Co 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI TRIAD, 4 x 18 AWG INDIVIDUAL & OVERALL SH
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado en Additional Works In Coarse Ore Co 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI TRIAD, 8 x 18 AWG INDIVIDUAL & OVERALL SH
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado en Additional Works In Coarse Ore Co 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE CONDUCTOR, 1/C AWG 10, HALOGEN FREE, RED
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado en Additional Works In Coarse Ore Co 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE CONDUCTOR, 1/C AWG 12, HALOGEN FREE, RED
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado en Additional Works In Coarse Ore Co 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Luminaria fluorescente industrial hermética, montaje a cielo, 2x32 W
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Equipo de alumbrado de emergencia, montaje en muro o columna, 2x50 W
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - DISTRIBUTION TRANSFORMER, 500 kVA, 22900/480 V, Dyn1, KNAN, 65°C, SILICONE OIL IMMERSED (TAG No.: XX
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 60% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado interior en Additional Works In Coars 10% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - MOTOR CONTROL CENTER, 480 V, 1200 A, 65 kA, NEMA 4
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 60% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado interior en Additional Works In Coars 10% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02

ministro / Instalación - Suministro e Instalación Placa de Montaje Tipo 3


2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ministro / Instalación - Soporte de Instalación cámaras CCTV Tipo 1
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Caja de Terreno MONITOREO DE CONDICIONES
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 50% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Rack Remoto (IO Block Terreno)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Gabinetes Comunicaciones en Terreno
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cámaras CCTV OUTDOOR
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Gabinete CCTV Outdoor (Power & Signal)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Excavación de Escarpe


2710 Excavacion de Escarpe en Portal Entry Platform Secc 100% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Revestimiento de Fondo con Mampostería, e=0,30 m
2710 Revestimiento de Fondo con Mamposteria, e=0,30 m 100% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Grounding system excavation
2710 Grounding system excavation en Portal Entry Platfo 100% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Excavación de Canales y Zanjas de Drenaje en Suelo Común
2710 Excavacion de Canales y Zanjas de Drenaje en Suelo 100% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Excavación Masiva en Terreno Común
2710 Excavacion Masiva en Terreno Comun en Portal Entr 100% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Excavación Masiva con Ripper
2710 Excavacion Masiva con Ripper en Portal Entry Platf 100% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Excavación Masiva en Roca
2710 Excavacion Masiva en Roca en Portal Entry Platform 100% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Excavación de Canales y Zanjas de Drenaje en Suelo Común
2710 Excavacion de Canales y Zanjas de Drenaje en Suelo 100% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Preparación de Subrasante
2710 Preparacion de Subrasante en Portal Entry Platform 100% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Pretil de seguridad h=0,8m
2710 Pretil de seguridad h=0,8m en Portal Entry Platform 100% CONSTRUCTEXECUTION FRONT 02

onveyor Tunnel

ntaje / Ejecución - COMPRESOR AIRE SERVICIO OVERLAND ; 50 NM3/H@690 KPA ; 200KG


2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Compresores en Additional Works In Coars 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Acumuladores, Secadores y Filtros en Addi 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - MOTOR ELECTRICO COMPRESOR AIRE SERVICIO OVERLAND ; 10 kW ; 100KG
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Compresores en Additional Works In Coars 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Acumuladores, Secadores y Filtros en Addi 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 01 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 02 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 03 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 04 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 05 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 06 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 07 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 08 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 09 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 10 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 11 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 12 AXIAL VENTILATION FAN WITH SILENCERS, 16990 Am3/h, 68 Pa
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 01 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 02 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 03 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 04 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 05 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 06 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 07 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 08 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 09 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 10 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 11 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL BAY 12 AXIAL VENTILATION FAN ELECTRIC MOTOR, 3.7 kW
2710 Recepcion y traslado de elementos a obra en Additi 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje Ventilador en Additional Works In Coarse 40% CONSTRUCTEXECUTION FRONT 02
2710 Montaje ducteria y soportacion en Additional Works 20% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado (*), Pruebas e Inspeccion en Additiona 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolo Entrega de Equipos en Additional Works 10% CONSTRUCTEXECUTION FRONT 02

tall / Perform - RT, NPS 1.50", Schedule SCH40S


2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 2.00", Schedule SCH80S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 0.50", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE SCH 40S EFW 316/316L SS A312, NPS 3.00", Schedule SCH40S
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A106, NPS 0.50", Schedule SCH XS pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A106, NPS 0.75", Schedule SCH XS pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A106, NPS 1.50", Schedule SCH XS pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A106, NPS 2.00", Schedule SCH XS pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A53, NPS 3.00", Schedule SCH STD pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A53, NPS 4.00", Schedule SCH STD pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 304, NPS 6.00", Schedule SCH10S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 304, NPS 2.00", Schedule SCH80S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 316, NPS 6.00", Schedule SCH10S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 316, NPS 3.00", Schedule SCH40S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 316, NPS 6.00", Schedule SCH40S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 40S EFW 316/316L SS A312, NPS 3.00", Schedule SCH40S
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe BU-22: BUTTEFLY LUG HP 150# SS 316 SS HO, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe BU-25: BUTTERFLY LUG HP 300# SS 316 SS GO, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316L SS A403-W, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 90 LR SCH 40S 316/316SS A403-W, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe FLG SO 150# RF 316/316L SS, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe FLG WN 300# RF 316 SS 40S BORE, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 40S EFW 316/316L SS A312, NPS 3.00", Schedule SCH40S
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 3/4"
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 2"
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero flexible y cubierta de PVC resistente a la radiación UV, diámetro 3/4"
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 8 AWG, 1x3c
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x3c
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 14 AWG, 1x3c
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 16 AWG, 1x3c
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
lticonductor de control, clase 600 V, aislamiento de XLPE, # 16 AWG, 1x5c
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Par apantallado, conductor de cobre, Clase 300 V, aislamiento de PVC, # 16 AWG, 1x1P (+Pantalla)
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de Instrumentación 1x1t;# 18 AWG apantallado
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable Profibus PA 1x1p;# 18 AWG, Tipo A
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable Profibus DP 1x1p;# 22 AWG Tipo A
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 10 AWG, 1x1c
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 12 AWG, 1x1c
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Messenger cable with hardware for 22.9kV cable
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Tendido terminado en Additional Works In Coarse O 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de fuerza, cobre, aislado, clase 600 V, #8 AWG
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conexionado Cable de Aterrizamiento 1x1c;8 AWG
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 4/0, 25 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado en Additional Works In Coarse Ore Co 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 2/0, XLPE/LSZH, BLACK
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado en Additional Works In Coarse Ore Co 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 14, XLPE/LSZH, BLACK
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado en Additional Works In Coarse Ore Co 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 3 X 16 AWG, XLPE/LSZH, BLACK
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado en Additional Works In Coarse Ore Co 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI TRIAD, 4 x 18 AWG INDIVIDUAL & OVERALL SH
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado en Additional Works In Coarse Ore Co 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI TRIAD, 8 x 18 AWG INDIVIDUAL & OVERALL SH
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado en Additional Works In Coarse Ore Co 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE CONDUCTOR, 1/C AWG 10, HALOGEN FREE, RED
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado en Additional Works In Coarse Ore Co 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE CONDUCTOR, 1/C AWG 12, HALOGEN FREE, RED
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado en Additional Works In Coarse Ore Co 20% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Luminaria fluorescente industrial hermética, montaje a cielo, 2x32 W
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Equipo de alumbrado de emergencia, montaje en muro o columna, 2x50 W
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 70% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - DISTRIBUTION TRANSFORMER, 500 kVA, 22900/480 V, Dyn1, KNAN, 65°C, SILICONE OIL IMMERSED (TAG No.: XX
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 60% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado interior en Additional Works In Coars 10% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - MOTOR CONTROL CENTER, 480 V, 1200 A, 65 kA, NEMA 4
2710 Suministro de materiales en Additional Works In Co 10% CONSTRUCTEXECUTION FRONT 02
2710 Montaje terminado en Additional Works In Coarse 60% CONSTRUCTEXECUTION FRONT 02
2710 Conexionado interior en Additional Works In Coars 10% CONSTRUCTEXECUTION FRONT 02
2710 Protocolos de pruebas y recepcion finales en Addit 20% CONSTRUCTEXECUTION FRONT 02

ministro / Instalación - Suministro e Instalación Placa de Montaje Tipo 3


2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ministro / Instalación - Soporte de Instalación cámaras CCTV Tipo 1
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Caja de Terreno MONITOREO DE CONDICIONES
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 50% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Rack Remoto (IO Block Terreno)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Gabinetes Comunicaciones en Terreno
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cámaras CCTV OUTDOOR
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Gabinete CCTV Outdoor (Power & Signal)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Excavación de Escarpe


2710 Excavacion de Escarpe en Portal Entry Platform Secc 100% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Revestimiento de Fondo con Mampostería, e=0,30 m
2710 Revestimiento de Fondo con Mamposteria, e=0,30 m 100% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Grounding system excavation
2710 Grounding system excavation en Portal Entry Platfo 100% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Excavación de Canales y Zanjas de Drenaje en Suelo Común
2710 Excavacion de Canales y Zanjas de Drenaje en Suelo 100% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Excavación Masiva en Terreno Común
2710 Excavacion Masiva en Terreno Comun en Portal Entr 100% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Excavación Masiva con Ripper
2710 Excavacion Masiva con Ripper en Portal Entry Platf 100% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Excavación Masiva en Roca
2710 Excavacion Masiva en Roca en Portal Entry Platform 100% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Excavación de Canales y Zanjas de Drenaje en Suelo Común
2710 Excavacion de Canales y Zanjas de Drenaje en Suelo 100% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Preparación de Subrasante
2710 Preparacion de Subrasante en Portal Entry Platform 100% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Pretil de seguridad h=0,8m
2710 Pretil de seguridad h=0,8m en Portal Entry Platform 100% CONSTRUCTEXECUTION FRONT 02
To Stockpile (Compartido con Frente 03)

ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”


2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2 1/2”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2 1/2” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro - Inserto estándar ASTM A36 Peso < 200 kg
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 05- Losa Cimentación e < 1m
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 06- Losa Cimentación 1m <= e < 2m
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 09- Pedestal Sección <= 1m2
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 10- Pedestal Sección > 1m2
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 11- Durmiente
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 27- Muro 0.4m < e <= 1m
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 05- Losa Cimentación e < 1m - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 06- Losa Cimentación 1m <= e < 2m - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 09- Pedestal Sección <= 1m2 - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 10- Pedestal Sección > 1m2 - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 11- Durmiente - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 27- Muro 0.4m < e <= 1m - Concreto f´c =350 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 61- Solado - Concreto f´c =100 kg/cm2
2730 Colocacion de Encofrado en Overland Conveyor Belt 25% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 30% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 25% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Acero Estructural Liviano (<= 30 kg/m)


2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Acero Estructural Mediano (> 30 kg/m y <= 60 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Acero Estructural Pesado (> 60 kg/m y <= 90 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Acero Estructural Extra Pesado (> 90 kg/m y <= 150 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Acero Estructural Doble Extra Pesado (> 150 kg/m <= 300 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Acero Estructural Triple Extra Pesado (> 300 kg/m y <= 642 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Rejilla de Piso - Acero Carbono 32mm x 5mm
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Baranda de acero con Guardapies
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Estructura Ensamblada Liviana (<= 30 kg/m)
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Estructura Ensamblada Mediana (> 30 kg/m y <= 60 kgf/m)
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Estructura Ensamblada Pesada (> 60 kg/m y <= 90 kgf/m)
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Revestimiento de Techo Plancha sin Aislación


2730 Armado y Montaje en Overland Conveyor Belt To Ore 70% CONSTRUCTEXECUTION FRONT 02
2730 Fijaciones en Overland Conveyor Belt To Ore Stockpi 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolos de Entregas en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Revestimiento Lateral Plancha sin Aislación
2730 Armado y Montaje en Overland Conveyor Belt To Ore 70% CONSTRUCTEXECUTION FRONT 02
2730 Fijaciones en Overland Conveyor Belt To Ore Stockpi 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolos de Entregas en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - CHUTE ALIMENTACION FAJA OVERLAND ; 8470KG


2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Bomba en Overland Conveyor Belt To Ore S 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VENTILATION FAN #1 WITH SILENCERS, 120000 Am3/h, 490 Pa
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Ventilador en Overland Conveyor Belt To Or 40% CONSTRUCTEXECUTION FRONT 02
2730 Montaje ducteria y soportacion en Overland Conveyo 20% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VENTILATION FAN #2 WITH SILENCERS, 120000 Am3/h, 490 Pa
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Ventilador en Overland Conveyor Belt To Or 40% CONSTRUCTEXECUTION FRONT 02
2730 Montaje ducteria y soportacion en Overland Conveyo 20% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VENTILATION FAN #3 WITH SILENCERS, 120000 Am3/h, 490 Pa
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Ventilador en Overland Conveyor Belt To Or 40% CONSTRUCTEXECUTION FRONT 02
2730 Montaje ducteria y soportacion en Overland Conveyo 20% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - BOMBA BOOSTER AGUA FRESCA SISTEMA SUPRESION DE POLVO ; 9,5 M3/H ; 100KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Bomba en Overland Conveyor Belt To Ore S 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - MOTOR ELECTRICO BOMBA BOOSTER AGUA FRESCA SISTEMA SUPRESION DE POLVO ; 3 kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Bomba en Overland Conveyor Belt To Ore S 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - SISTEMA SUPRESOR DE POLVO DESCARGA FAJA DE SACRIFICIO ; 3 kW ; 300KG SACRIFICE CONVEYOR DISCHARGE
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos Supresores de Polvo en Overland 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESOR DE POLVO SACRIFICE CONVEYOR DISCHARGE DUST SUPPRESSOR SY
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos Supresores de Polvo en Overland 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - SISTEMA SUPRESOR DE POLVO 3, DESCARGA FAJA OVERLAND ; 3 kW ; 500KG OVERLAND CONVEYOR DISCHARGE
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos Supresores de Polvo en Overland 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESOR DE POLVO OVERLAND CONVEYOR DISCHARGE DUST SUPPRESSOR S
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos Supresores de Polvo en Overland 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - CINTA FAJA TRANSPORTADORA OVERLAND ; FLUJO HUMEDO 10897 TPH, 2,5 % HUMEDAD ; 4711x1,829x195m
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-IMPACT TABLE
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-LOAD TABLE
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-TAIL FRAME SYSTEM
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - MOTOR ELECTRICO GEARLESS 1 FAJA OVERLAND ; 5500kW ; 80000KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - MOTOR ELECTRICO GEARLESS 2 FAJA OVERLAND ; 5500kW ; 80000KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - BALANZA FAJA OVERLAND ; 0,5kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - FRENO HIDRAULICO POLEA MOTRIZ 1 FAJA OVERLAND
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - MOTOR DE BOMBA FRENO HIDRAULICO POLEA MOTRIZ 1 FAJA OVERLAND ; 3kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - FRENO HIDRAULICO POLEA MOTRIZ 2 FAJA OVERLAND
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - MOTOR DE BOMBA FRENO HIDRAULICO POLEA MOTRIZ 2 FAJA OVERLAND ; 3kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - FRENO CABRESTANTE PARA FAJA TRANSPORTADORA OVERLAND ; 2,6x1,4x1,4m
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - MOTOR BOMBA 1 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 37kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - MOTOR BOMBA 2 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 37kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - UNIDAD DE ENFRIAMIENTO 1 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 36kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - UNIDAD DE ENFRIAMIENTO 2 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 36kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - UNIDAD DE ENFRIAMIENTO 2 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 36kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - OVERLAND CONVEYOR MOTOR WATER COOLING SYSTEM CONTROL PANEL
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - OVERLAND CONVEYOR IDLER GUARDING
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - POLIPASTO ELECTRICO MANTENCION FAJAS ALIMENTADORAS ; 25 T ; 1,2x2,05x1,1m ; 10 kW ; 1300KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje En sitio de poliplastos 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - POLIPASTO ELECTRICO MANTENCION FAJAS ALIMENTADORAS ; 25 T ; 1,2x2,05x1,1m ; 10 kW ; 1300KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje En sitio de poliplastos 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02

bricate - Handling of pipe PIPE SCH 40S SMLS 316/316L SS A312, NPS 1.50", Schedule SCH40S
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE SCH 40S SMLS 316/316L SS A312, NPS 1.50", Schedule SCH40S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of CAP 3000# SW 316/316L SS, NPS 1.50", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Socket Weld SS, NPS 2.00", Schedule SCH40S
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 6.00", Schedule SCH10S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 2.00", Schedule SCH40S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 0.50", Schedule SCH80S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 14.00", Schedule SCH STD
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 0.50", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 0.75", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE XS SMLS STL A106-B, NPS 2.00", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE SCH 40S SMLS 316/316L SS A312, NPS 1.50", Schedule SCH40S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE SCH 40S SMLS 316/316L SS A312, NPS 2.00", Schedule SCH40S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A106, NPS 1.00", Schedule SCH XS pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A106, NPS 1.50", Schedule SCH XS pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 316, NPS 6.00", Schedule SCH10S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 316, NPS 6.00", Schedule SCH40S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, NPS 2.00", Schedule SCH XS
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/316L SS A312, NPS 1.50", Schedule SCH40S
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/316L SS A312, NPS 2.00", Schedule SCH40S
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe BA-16: BALL 600# SCRD CS PTFE HO, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 90 DEG 300# SCRD MI A197, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe COUPLING RED 300# SW 316/316L SS, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 45 SCH 10S 316/316L SS A403-W, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 90 DEG 3000# SW 316/316L SS, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316L SS A403-W, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe FLG SW 150# RF 316/316L SS 40S BORE, NPS 2.00", Schedule
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, NPS 2.00", Schedule SCH XS
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/316L SS A312, NPS 1.50", Schedule SCH40S
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/316L SS A312, NPS 2.00", Schedule SCH40S
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Pesómetro de Faja


2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Indicador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor de Flujo Tipo Térmico
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Indicadores de Presión sin/con Sello
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Indicador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptores de Presión sin/con Sello
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sensor Temperatura
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Sensor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Transmisor de Temperatura
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sirena (Horn)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Sirena en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Baliza (Beacon)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Baliza en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor de Desalineamiento Faja
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor de Seguridad tipo Pull Cord
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor de Corte de Faja Mecánico
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sensor/Transmisor de Velocidad
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sistema de Detección de Ruptura de Fajas Electrónico
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sensor/Transmisor de Vibración
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor posición contrapeso fajas
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor posición carro repartidor
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sensor transmision de posicion
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor de posición cerrado / abierto
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Tipo de radar de interruptor de nivel
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Panel Paquete Mecánico Tipo # 1 (Hasta 40 kg)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Panel Paquete Mecánico Tipo # 2 (Entre 41 kg y 80 kg)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ministro / Instalación - Suministro e Instalación Placa de Montaje Tipo 3
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Caja de Terreno MONITOREO DE CONDICIONES
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Rack Remoto (IO Block Terreno)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cámaras CCTV OUTDOOR
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Gabinete CCTV Outdoor (Power & Signal)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
To Stockpile (Compartido con Frente 03)

ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”


2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2 1/2”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2 1/2” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro - Inserto estándar ASTM A36 Peso < 200 kg
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 05- Losa Cimentación e < 1m
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 06- Losa Cimentación 1m <= e < 2m
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 09- Pedestal Sección <= 1m2
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 10- Pedestal Sección > 1m2
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 11- Durmiente
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 27- Muro 0.4m < e <= 1m
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 05- Losa Cimentación e < 1m - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 06- Losa Cimentación 1m <= e < 2m - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 09- Pedestal Sección <= 1m2 - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 10- Pedestal Sección > 1m2 - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 11- Durmiente - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 27- Muro 0.4m < e <= 1m - Concreto f´c =350 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 61- Solado - Concreto f´c =100 kg/cm2
2730 Colocacion de Encofrado en Overland Conveyor Belt 25% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 30% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 25% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Acero Estructural Liviano (<= 30 kg/m)


2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Acero Estructural Mediano (> 30 kg/m y <= 60 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Acero Estructural Pesado (> 60 kg/m y <= 90 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Acero Estructural Extra Pesado (> 90 kg/m y <= 150 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Acero Estructural Doble Extra Pesado (> 150 kg/m <= 300 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Acero Estructural Triple Extra Pesado (> 300 kg/m y <= 642 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Rejilla de Piso - Acero Carbono 32mm x 5mm
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Baranda de acero con Guardapies
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Estructura Ensamblada Liviana (<= 30 kg/m)
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Estructura Ensamblada Mediana (> 30 kg/m y <= 60 kgf/m)
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Estructura Ensamblada Pesada (> 60 kg/m y <= 90 kgf/m)
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Revestimiento de Techo Plancha sin Aislación
2730 Armado y Montaje en Overland Conveyor Belt To Ore 70% CONSTRUCTEXECUTION FRONT 02
2730 Fijaciones en Overland Conveyor Belt To Ore Stockpi 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolos de Entregas en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Revestimiento Lateral Plancha sin Aislación
2730 Armado y Montaje en Overland Conveyor Belt To Ore 70% CONSTRUCTEXECUTION FRONT 02
2730 Fijaciones en Overland Conveyor Belt To Ore Stockpi 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolos de Entregas en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VENTILATION FAN #1 WITH SILENCERS, 120000 Am3/h, 490 Pa
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Ventilador en Overland Conveyor Belt To Or 40% CONSTRUCTEXECUTION FRONT 02
2730 Montaje ducteria y soportacion en Overland Conveyo 20% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VENTILATION FAN #2 WITH SILENCERS, 120000 Am3/h, 490 Pa
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Ventilador en Overland Conveyor Belt To Or 40% CONSTRUCTEXECUTION FRONT 02
2730 Montaje ducteria y soportacion en Overland Conveyo 20% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VENTILATION FAN #3 WITH SILENCERS, 120000 Am3/h, 490 Pa
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Ventilador en Overland Conveyor Belt To Or 40% CONSTRUCTEXECUTION FRONT 02
2730 Montaje ducteria y soportacion en Overland Conveyo 20% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - BOMBA BOOSTER AGUA FRESCA SISTEMA SUPRESION DE POLVO ; 9,5 M3/H ; 100KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Bomba en Overland Conveyor Belt To Ore S 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - MOTOR ELECTRICO BOMBA BOOSTER AGUA FRESCA SISTEMA SUPRESION DE POLVO ; 3 kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Bomba en Overland Conveyor Belt To Ore S 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - SISTEMA SUPRESOR DE POLVO DESCARGA FAJA DE SACRIFICIO ; 3 kW ; 300KG SACRIFICE CONVEYOR DISCHARGE
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos Supresores de Polvo en Overland 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESOR DE POLVO SACRIFICE CONVEYOR DISCHARGE DUST SUPPRESSOR SY
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos Supresores de Polvo en Overland 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - SISTEMA SUPRESOR DE POLVO 3, DESCARGA FAJA OVERLAND ; 3 kW ; 500KG OVERLAND CONVEYOR DISCHARGE
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos Supresores de Polvo en Overland 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESOR DE POLVO OVERLAND CONVEYOR DISCHARGE DUST SUPPRESSOR S
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos Supresores de Polvo en Overland 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - CINTA FAJA TRANSPORTADORA OVERLAND ; FLUJO HUMEDO 10897 TPH, 2,5 % HUMEDAD ; 4711x1,829x195m
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-LOAD TABLE
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-TAIL FRAME SYSTEM
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - MOTOR ELECTRICO GEARLESS 1 FAJA OVERLAND ; 5500kW ; 80000KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - MOTOR ELECTRICO GEARLESS 2 FAJA OVERLAND ; 5500kW ; 80000KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - BALANZA FAJA OVERLAND ; 0,5kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - FRENO HIDRAULICO POLEA MOTRIZ 1 FAJA OVERLAND
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - MOTOR DE BOMBA FRENO HIDRAULICO POLEA MOTRIZ 1 FAJA OVERLAND ; 3kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - FRENO HIDRAULICO POLEA MOTRIZ 2 FAJA OVERLAND
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - MOTOR DE BOMBA FRENO HIDRAULICO POLEA MOTRIZ 2 FAJA OVERLAND ; 3kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - FRENO CABRESTANTE PARA FAJA TRANSPORTADORA OVERLAND ; 2,6x1,4x1,4m
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - MOTOR BOMBA 1 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 37kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - MOTOR BOMBA 2 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 37kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - UNIDAD DE ENFRIAMIENTO 1 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 36kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - UNIDAD DE ENFRIAMIENTO 2 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 36kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - UNIDAD DE ENFRIAMIENTO 2 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 36kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - OVERLAND CONVEYOR MOTOR WATER COOLING SYSTEM CONTROL PANEL
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - OVERLAND CONVEYOR IDLER GUARDING
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Pesómetro de Faja


2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Indicador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor de Flujo Tipo Térmico
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Indicadores de Presión sin/con Sello
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Indicador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptores de Presión sin/con Sello
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sensor Temperatura
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Sensor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Transmisor de Temperatura
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sirena (Horn)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Sirena en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Baliza (Beacon)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Baliza en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor de Desalineamiento Faja
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor de Seguridad tipo Pull Cord
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor de Corte de Faja Mecánico
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sensor/Transmisor de Velocidad
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sistema de Detección de Ruptura de Fajas Electrónico
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sensor/Transmisor de Vibración
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor posición contrapeso fajas
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor posición carro repartidor
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sensor transmision de posicion
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor de posición cerrado / abierto
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Tipo de radar de interruptor de nivel
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Panel Paquete Mecánico Tipo # 1 (Hasta 40 kg)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Panel Paquete Mecánico Tipo # 2 (Entre 41 kg y 80 kg)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ministro / Instalación - Suministro e Instalación Placa de Montaje Tipo 3
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Caja de Terreno MONITOREO DE CONDICIONES
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Rack Remoto (IO Block Terreno)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cámaras CCTV OUTDOOR
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Gabinete CCTV Outdoor (Power & Signal)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
To Stockpile (Compartido con Frente 03)

ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”


2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2 1/2”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2 1/2” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro - Inserto estándar ASTM A36 Peso < 200 kg
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 05- Losa Cimentación e < 1m
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 06- Losa Cimentación 1m <= e < 2m
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 09- Pedestal Sección <= 1m2
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 10- Pedestal Sección > 1m2
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 11- Durmiente
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 27- Muro 0.4m < e <= 1m
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 05- Losa Cimentación e < 1m - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 06- Losa Cimentación 1m <= e < 2m - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 09- Pedestal Sección <= 1m2 - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 10- Pedestal Sección > 1m2 - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 11- Durmiente - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 27- Muro 0.4m < e <= 1m - Concreto f´c =350 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 61- Solado - Concreto f´c =100 kg/cm2
2730 Colocacion de Encofrado en Overland Conveyor Belt 25% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 30% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 25% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Acero Estructural Liviano (<= 30 kg/m)


2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Acero Estructural Mediano (> 30 kg/m y <= 60 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Acero Estructural Pesado (> 60 kg/m y <= 90 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Acero Estructural Extra Pesado (> 90 kg/m y <= 150 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Acero Estructural Doble Extra Pesado (> 150 kg/m <= 300 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Acero Estructural Triple Extra Pesado (> 300 kg/m y <= 642 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Rejilla de Piso - Acero Carbono 32mm x 5mm
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Baranda de acero con Guardapies
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Estructura Ensamblada Liviana (<= 30 kg/m)
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Estructura Ensamblada Mediana (> 30 kg/m y <= 60 kgf/m)
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Estructura Ensamblada Pesada (> 60 kg/m y <= 90 kgf/m)
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Revestimiento de Techo Plancha sin Aislación


2730 Armado y Montaje en Overland Conveyor Belt To Ore 70% CONSTRUCTEXECUTION FRONT 02
2730 Fijaciones en Overland Conveyor Belt To Ore Stockpi 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolos de Entregas en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Revestimiento Lateral Plancha sin Aislación
2730 Armado y Montaje en Overland Conveyor Belt To Ore 70% CONSTRUCTEXECUTION FRONT 02
2730 Fijaciones en Overland Conveyor Belt To Ore Stockpi 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolos de Entregas en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VENTILATION FAN #1 WITH SILENCERS, 120000 Am3/h, 490 Pa
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Ventilador en Overland Conveyor Belt To Or 40% CONSTRUCTEXECUTION FRONT 02
2730 Montaje ducteria y soportacion en Overland Conveyo 20% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VENTILATION FAN #2 WITH SILENCERS, 120000 Am3/h, 490 Pa
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Ventilador en Overland Conveyor Belt To Or 40% CONSTRUCTEXECUTION FRONT 02
2730 Montaje ducteria y soportacion en Overland Conveyo 20% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VENTILATION FAN #3 WITH SILENCERS, 120000 Am3/h, 490 Pa
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Ventilador en Overland Conveyor Belt To Or 40% CONSTRUCTEXECUTION FRONT 02
2730 Montaje ducteria y soportacion en Overland Conveyo 20% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - BOMBA BOOSTER AGUA FRESCA SISTEMA SUPRESION DE POLVO ; 9,5 M3/H ; 100KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Bomba en Overland Conveyor Belt To Ore S 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - MOTOR ELECTRICO BOMBA BOOSTER AGUA FRESCA SISTEMA SUPRESION DE POLVO ; 3 kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Bomba en Overland Conveyor Belt To Ore S 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - SISTEMA SUPRESOR DE POLVO DESCARGA FAJA DE SACRIFICIO ; 3 kW ; 300KG SACRIFICE CONVEYOR DISCHARGE
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos Supresores de Polvo en Overland 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESOR DE POLVO SACRIFICE CONVEYOR DISCHARGE DUST SUPPRESSOR SY
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos Supresores de Polvo en Overland 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - SISTEMA SUPRESOR DE POLVO 3, DESCARGA FAJA OVERLAND ; 3 kW ; 500KG OVERLAND CONVEYOR DISCHARGE
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos Supresores de Polvo en Overland 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESOR DE POLVO OVERLAND CONVEYOR DISCHARGE DUST SUPPRESSOR S
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos Supresores de Polvo en Overland 60% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - CINTA FAJA TRANSPORTADORA OVERLAND ; FLUJO HUMEDO 10897 TPH, 2,5 % HUMEDAD ; 4711x1,829x195m
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-LOAD TABLE
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-TAIL FRAME SYSTEM
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - MOTOR ELECTRICO GEARLESS 1 FAJA OVERLAND ; 5500kW ; 80000KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - MOTOR ELECTRICO GEARLESS 2 FAJA OVERLAND ; 5500kW ; 80000KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - BALANZA FAJA OVERLAND ; 0,5kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - FRENO HIDRAULICO POLEA MOTRIZ 1 FAJA OVERLAND
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - MOTOR DE BOMBA FRENO HIDRAULICO POLEA MOTRIZ 1 FAJA OVERLAND ; 3kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - FRENO HIDRAULICO POLEA MOTRIZ 2 FAJA OVERLAND
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - MOTOR DE BOMBA FRENO HIDRAULICO POLEA MOTRIZ 2 FAJA OVERLAND ; 3kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - FRENO CABRESTANTE PARA FAJA TRANSPORTADORA OVERLAND ; 2,6x1,4x1,4m
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - MOTOR BOMBA 1 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 37kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - MOTOR BOMBA 2 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 37kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - UNIDAD DE ENFRIAMIENTO 1 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 36kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - UNIDAD DE ENFRIAMIENTO 2 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 36kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - UNIDAD DE ENFRIAMIENTO 2 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 36kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - OVERLAND CONVEYOR MOTOR WATER COOLING SYSTEM CONTROL PANEL
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02
taje / Ejecución - OVERLAND CONVEYOR IDLER GUARDING
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 02
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 02
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 02
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 02
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Pesómetro de Faja


2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Indicador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor de Flujo Tipo Térmico
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Indicadores de Presión sin/con Sello
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Indicador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptores de Presión sin/con Sello
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sensor Temperatura
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Sensor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Transmisor de Temperatura
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sirena (Horn)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Sirena en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Baliza (Beacon)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Baliza en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor de Desalineamiento Faja
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor de Seguridad tipo Pull Cord
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor de Corte de Faja Mecánico
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sensor/Transmisor de Velocidad
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sistema de Detección de Ruptura de Fajas Electrónico
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sensor/Transmisor de Vibración
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor posición contrapeso fajas
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor posición carro repartidor
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sensor transmision de posicion
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Interruptor de posición cerrado / abierto
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Tipo de radar de interruptor de nivel
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Panel Paquete Mecánico Tipo # 1 (Hasta 40 kg)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Panel Paquete Mecánico Tipo # 2 (Entre 41 kg y 80 kg)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ministro / Instalación - Suministro e Instalación Placa de Montaje Tipo 3
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Caja de Terreno MONITOREO DE CONDICIONES
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Rack Remoto (IO Block Terreno)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cámaras CCTV OUTDOOR
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Gabinete CCTV Outdoor (Power & Signal)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02

ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”


2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro - Inserto estándar ASTM A36 Peso < 200 kg
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 08- Anillo de Cimentación
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 40- Losa de Piso Incluye Sumidero y Sobre-espesores
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 02
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 02
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 08- Anillo de Cimentación - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 40- Losa de Piso Incluye Sumidero y Sobre-espesores - Concreto f´c
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 02
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02
ncreto vaciado en obra - Tipo 61- Solado - Concreto f´c =100 kg/cm2
2730 Colocacion de Encofrado en Overland Conveyor Belt 25% CONSTRUCTEXECUTION FRONT 02
2730 Vaciado de Concreto en Overland Conveyor Belt To O 30% CONSTRUCTEXECUTION FRONT 02
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 25% CONSTRUCTEXECUTION FRONT 02
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 02
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 02

bricate - Handling of pipe BU-22: BUTTERFLY LUG HP 150# SS 316 SS HO, NPS 6.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe BU-23: BUTTERFLY LUG HP 150# SS 316 SS GO, NPS 10.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe ELL 45 DEG FAB HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 14.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe ELL 45 DEG MOLDED HDPE SDR 17 PE 4710 IPS, NPS 6.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe ELL 90 DEG FAB HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 10.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe ELL 90 DEG FAB HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 14.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe ELL 90 DEG MOLDED HDPE SDR 17 PE 4710 IPS, NPS 6.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe FLANGE ADAPTOR HDPE SDR 17 PE 4710 IPS, NPS 6.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe FLANGE ADAPTOR HDPE SDR 17 PE 4710 IPS, NPS 10.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe FLANGE ADAPTOR HDPE SDR 17 PE 4710 IPS, NPS 14.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPOXY COATED, NPS 6.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPOXY COATED, NPS 10.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPOXY COATED, NPS 14.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe TEE RED 10x6 FAB HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 10.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Butt Weld / Slip-on CS, NPS 6.00", Schedule SCH10S
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 6.00", Schedule SCH10S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 1.00", Schedule SCH40S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 20.00", Schedule SCH STD
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 0.50", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE SCH 10S EFW 316/316L SS A312, NPS 6.00", Schedule SCH10S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A106, NPS 1.00", Schedule SCH XS pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A53, NPS 6.00", Schedule SCH STD pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 304, NPS 4.00", Schedule SCH10S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 316, NPS 3.00", Schedule SCH10S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 316, NPS 3.00", Schedule SCH40S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316L SS A312, NPS 6.00", Schedule SCH10S
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE HDPE SDR 17 PE 4710 IPS, NPS 14.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE HDPE SDR 17 PE 4710 IPS, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe BU-22: BUTTEFLY LUG HP 150# SS 316 SS HO, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316L SS A403-W, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe FLG SO 150# RF 316/316L SS, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Butt Weld / Slip-on CS, NPS 6.00", Schedule SCH10S
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316L SS A312, NPS 6.00", Schedule SCH10S
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Transmisor de Nivel Tipo Radar Flanged


2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Indicadores Remotos
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Indicador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Actuador eléctrico con interruptores de posición
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
en CONTRACT de CWP List by Discipline)
ra en Bill Quantity)
ounding system excavation
2610 Excavación para puesta a tierra 100% CONSTRUCTEXECUTION FRONT 02
ried Conduit excavation
2610 Excavación para conductos enterrados 100% CONSTRUCTEXECUTION FRONT 02
uct Bank excavation
8 100% CONSTRUCTEXECUTION FRONT 02
ounding system backfill and compaction
2610 Relleno para puesta a tierra 100% CONSTRUCTEXECUTION FRONT 02
ried conduit backfill and compaction
2610 Relleno para conductos enterrados 100% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Duct Bank backfill and compaction
2610 Relleno de bancoductos 100% CONSTRUCTEXECUTION FRONT 02

ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”


2910 Suministro y Colocacion en Fresh Water Tank (2910 50% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Fresh Water Tank (2910-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2910 Recepcion de Protocolo Topografico sin observacio 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2910 Suministro y Colocacion en Fresh Water Tank (2910 50% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Fresh Water Tank (2910-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2910 Recepcion de Protocolo Topografico sin observacio 40% CONSTRUCTEXECUTION FRONT 02
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2910 Suministro y Colocacion en Fresh Water Tank (2910 50% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Fresh Water Tank (2910-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2910 Recepcion de Protocolo Topografico sin observacio 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2910 Suministro y Colocacion en Fresh Water Tank (2910 50% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Fresh Water Tank (2910-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2910 Recepcion de Protocolo Topografico sin observacio 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2”
2910 Suministro y Colocacion en Fresh Water Tank (2910 50% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Fresh Water Tank (2910-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2910 Recepcion de Protocolo Topografico sin observacio 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2” con camisa
2910 Suministro y Colocacion en Fresh Water Tank (2910 50% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Fresh Water Tank (2910-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2910 Recepcion de Protocolo Topografico sin observacio 40% CONSTRUCTEXECUTION FRONT 02
ministro - Inserto estándar ASTM A36 Peso < 200 kg
2910 Suministro y Colocacion en Fresh Water Tank (2910 50% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Fresh Water Tank (2910-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2910 Recepcion de Protocolo Topografico sin observacio 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
2910 Suministro y Colocacion en Fresh Water Tank (2910 50% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Fresh Water Tank (2910-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2910 Recepcion de Protocolo Topografico sin observacio 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 08- Anillo de Cimentación
2910 Suministro en Fresh Water Tank (2910-TK-001) 30% CONSTRUCTEXECUTION FRONT 02
2910 Cortado en Fresh Water Tank (2910-TK-001) 15% CONSTRUCTEXECUTION FRONT 02
2910 Doblado en Fresh Water Tank (2910-TK-001) 15% CONSTRUCTEXECUTION FRONT 02
2910 Punch List Completado en Fresh Water Tank (2910- 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 26- Muro e<= 0.4m
2910 Suministro en Fresh Water Tank (2910-TK-001) 30% CONSTRUCTEXECUTION FRONT 02
2910 Cortado en Fresh Water Tank (2910-TK-001) 15% CONSTRUCTEXECUTION FRONT 02
2910 Doblado en Fresh Water Tank (2910-TK-001) 15% CONSTRUCTEXECUTION FRONT 02
2910 Punch List Completado en Fresh Water Tank (2910- 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 40- Losa de Piso Incluye Sumidero y Sobre-espesores
2910 Suministro en Fresh Water Tank (2910-TK-001) 30% CONSTRUCTEXECUTION FRONT 02
2910 Cortado en Fresh Water Tank (2910-TK-001) 15% CONSTRUCTEXECUTION FRONT 02
2910 Doblado en Fresh Water Tank (2910-TK-001) 15% CONSTRUCTEXECUTION FRONT 02
2910 Punch List Completado en Fresh Water Tank (2910- 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 08- Anillo de Cimentación - Concreto f´c =280 kg/cm2
2910 Colocacion de Acero de Refuerzo en Fresh Water Ta 10% CONSTRUCTEXECUTION FRONT 02
2910 Colocacion de Encofrado en Fresh Water Tank (2910 20% CONSTRUCTEXECUTION FRONT 02
2910 Colocacion Topografica de Insertos Estandar y Pern 10% CONSTRUCTEXECUTION FRONT 02
2910 Vaciado de Concreto en Fresh Water Tank (2910-TK 35% CONSTRUCTEXECUTION FRONT 02
2910 Descimbrado en Fresh Water Tank (2910-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Fresh Water Tank (2910-TK-001) 5% CONSTRUCTEXECUTION FRONT 02
2910 Punch List Completado en Fresh Water Tank (2910- 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 26- Muro e<= 0.4m - Concreto f´c =280 kg/cm2
2910 Colocacion de Acero de Refuerzo en Fresh Water Ta 10% CONSTRUCTEXECUTION FRONT 02
2910 Colocacion de Encofrado en Fresh Water Tank (2910 20% CONSTRUCTEXECUTION FRONT 02
2910 Colocacion Topografica de Insertos Estandar y Pern 10% CONSTRUCTEXECUTION FRONT 02
2910 Vaciado de Concreto en Fresh Water Tank (2910-TK 35% CONSTRUCTEXECUTION FRONT 02
2910 Descimbrado en Fresh Water Tank (2910-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Fresh Water Tank (2910-TK-001) 5% CONSTRUCTEXECUTION FRONT 02
2910 Punch List Completado en Fresh Water Tank (2910- 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 40- Losa de Piso Incluye Sumidero y Sobre-espesores - Concreto f´c
2910 Colocacion de Acero de Refuerzo en Fresh Water Ta 10% CONSTRUCTEXECUTION FRONT 02
2910 Colocacion de Encofrado en Fresh Water Tank (2910 20% CONSTRUCTEXECUTION FRONT 02
2910 Vaciado de Concreto en Fresh Water Tank (2910-TK 45% CONSTRUCTEXECUTION FRONT 02
2910 Descimbrado en Fresh Water Tank (2910-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Fresh Water Tank (2910-TK-001) 5% CONSTRUCTEXECUTION FRONT 02
2910 Punch List Completado en Fresh Water Tank (2910- 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 61- Solado - Concreto f´c =100 kg/cm2
2910 Colocacion de Encofrado en Fresh Water Tank (2910 25% CONSTRUCTEXECUTION FRONT 02
2910 Vaciado de Concreto en Fresh Water Tank (2910-TK 30% CONSTRUCTEXECUTION FRONT 02
2910 Descimbrado en Fresh Water Tank (2910-TK-001) 25% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Fresh Water Tank (2910-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2910 Punch List Completado en Fresh Water Tank (2910- 10% CONSTRUCTEXECUTION FRONT 02
orage, Potable Water Storage, Potable Water System, Reverse Osmosis Plant, Water Truck Filling Station)

ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”


2910 Suministro y Colocacion en Piping A/G (Include Fres 50% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Piping A/G (Include Fresh Water Storage 10% CONSTRUCTEXECUTION FRONT 02
2910 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2910 Suministro y Colocacion en Piping A/G (Include Fres 50% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Piping A/G (Include Fresh Water Storage 10% CONSTRUCTEXECUTION FRONT 02
2910 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 02
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2910 Suministro y Colocacion en Piping A/G (Include Fres 50% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Piping A/G (Include Fresh Water Storage 10% CONSTRUCTEXECUTION FRONT 02
2910 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2910 Suministro y Colocacion en Piping A/G (Include Fres 50% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Piping A/G (Include Fresh Water Storage 10% CONSTRUCTEXECUTION FRONT 02
2910 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2”
2910 Suministro y Colocacion en Piping A/G (Include Fres 50% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Piping A/G (Include Fresh Water Storage 10% CONSTRUCTEXECUTION FRONT 02
2910 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2” con camisa
2910 Suministro y Colocacion en Piping A/G (Include Fres 50% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Piping A/G (Include Fresh Water Storage 10% CONSTRUCTEXECUTION FRONT 02
2910 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 02
ministro - Inserto estándar ASTM A36 Peso < 200 kg
2910 Suministro y Colocacion en Piping A/G (Include Fres 50% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Piping A/G (Include Fresh Water Storage 10% CONSTRUCTEXECUTION FRONT 02
2910 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
2910 Suministro y Colocacion en Piping A/G (Include Fres 50% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Piping A/G (Include Fresh Water Storage 10% CONSTRUCTEXECUTION FRONT 02
2910 Recepcion de Protocolo Topografico sin observacione 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 05- Losa Cimentación e < 1m
2910 Suministro en Piping A/G (Include Fresh Water Stora 30% CONSTRUCTEXECUTION FRONT 02
2910 Cortado en Piping A/G (Include Fresh Water Storage, 15% CONSTRUCTEXECUTION FRONT 02
2910 Doblado en Piping A/G (Include Fresh Water Storage, 15% CONSTRUCTEXECUTION FRONT 02
2910 Punch List Completado en Piping A/G (Include Fresh 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 08- Anillo de Cimentación
2910 Suministro en Piping A/G (Include Fresh Water Stora 30% CONSTRUCTEXECUTION FRONT 02
2910 Cortado en Piping A/G (Include Fresh Water Storage, 15% CONSTRUCTEXECUTION FRONT 02
2910 Doblado en Piping A/G (Include Fresh Water Storage, 15% CONSTRUCTEXECUTION FRONT 02
2910 Punch List Completado en Piping A/G (Include Fresh 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 40- Losa de Piso Incluye Sumidero y Sobre-espesores
2910 Suministro en Piping A/G (Include Fresh Water Stora 30% CONSTRUCTEXECUTION FRONT 02
2910 Cortado en Piping A/G (Include Fresh Water Storage, 15% CONSTRUCTEXECUTION FRONT 02
2910 Doblado en Piping A/G (Include Fresh Water Storage, 15% CONSTRUCTEXECUTION FRONT 02
2910 Punch List Completado en Piping A/G (Include Fresh 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 69- Cámara
2910 Suministro en Piping A/G (Include Fresh Water Stora 30% CONSTRUCTEXECUTION FRONT 02
2910 Cortado en Piping A/G (Include Fresh Water Storage, 15% CONSTRUCTEXECUTION FRONT 02
2910 Doblado en Piping A/G (Include Fresh Water Storage, 15% CONSTRUCTEXECUTION FRONT 02
2910 Punch List Completado en Piping A/G (Include Fresh 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 69- Cámara - Concreto f´c =210 kg/cm2
2910 Colocacion de Acero de Refuerzo en Piping A/G (Incl 10% CONSTRUCTEXECUTION FRONT 02
2910 Colocacion de Encofrado en Piping A/G (Include Fres 20% CONSTRUCTEXECUTION FRONT 02
2910 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2910 Vaciado de Concreto en Piping A/G (Include Fresh Wa 35% CONSTRUCTEXECUTION FRONT 02
2910 Descimbre en Piping A/G (Include Fresh Water Storag 10% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Piping A/G (Include Fresh Water Storage 5% CONSTRUCTEXECUTION FRONT 02
2910 Punch List Completado en Piping A/G (Include Fresh 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 05- Losa Cimentación e < 1m - Concreto f´c =280 kg/cm2
2910 Colocacion de Acero de Refuerzo en Piping A/G (Incl 10% CONSTRUCTEXECUTION FRONT 02
2910 Colocacion de Encofrado en Piping A/G (Include Fres 20% CONSTRUCTEXECUTION FRONT 02
2910 Vaciado de Concreto en Piping A/G (Include Fresh Wa 45% CONSTRUCTEXECUTION FRONT 02
2910 Descimbre en Piping A/G (Include Fresh Water Storag 10% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Piping A/G (Include Fresh Water Storage 5% CONSTRUCTEXECUTION FRONT 02
2910 Punch List Completado en Piping A/G (Include Fresh 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 08- Anillo de Cimentación - Concreto f´c =280 kg/cm2
2910 Colocacion de Acero de Refuerzo en Piping A/G (Incl 10% CONSTRUCTEXECUTION FRONT 02
2910 Colocacion de Encofrado en Piping A/G (Include Fres 20% CONSTRUCTEXECUTION FRONT 02
2910 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 02
2910 Vaciado de Concreto en Piping A/G (Include Fresh Wa 35% CONSTRUCTEXECUTION FRONT 02
2910 Descimbre en Piping A/G (Include Fresh Water Storag 10% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Piping A/G (Include Fresh Water Storage 5% CONSTRUCTEXECUTION FRONT 02
2910 Punch List Completado en Piping A/G (Include Fresh 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 40- Losa de Piso Incluye Sumidero y Sobre-espesores - Concreto f´c
2910 Colocacion de Acero de Refuerzo en Piping A/G (Incl 10% CONSTRUCTEXECUTION FRONT 02
2910 Colocacion de Encofrado en Piping A/G (Include Fres 20% CONSTRUCTEXECUTION FRONT 02
2910 Vaciado de Concreto en Piping A/G (Include Fresh Wa 45% CONSTRUCTEXECUTION FRONT 02
2910 Descimbre en Piping A/G (Include Fresh Water Storag 10% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Piping A/G (Include Fresh Water Storage 5% CONSTRUCTEXECUTION FRONT 02
2910 Punch List Completado en Piping A/G (Include Fresh 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 61- Solado - Concreto f´c =100 kg/cm2
2910 Colocacion de Encofrado en Piping A/G (Include Fres 25% CONSTRUCTEXECUTION FRONT 02
2910 Vaciado de Concreto en Piping A/G (Include Fresh Wa 30% CONSTRUCTEXECUTION FRONT 02
2910 Descimbre en Piping A/G (Include Fresh Water Storag 25% CONSTRUCTEXECUTION FRONT 02
2910 Limpieza en Piping A/G (Include Fresh Water Storage 10% CONSTRUCTEXECUTION FRONT 02
2910 Punch List Completado en Piping A/G (Include Fresh 10% CONSTRUCTEXECUTION FRONT 02

bricate - Handling of pipe BU-10: BUTTERFLY LUG 150 PSI CI BUNA-N HO, NPS 4.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe BU-22: BUTTERFLY LUG HP 150# SS 316 SS HO, NPS 6.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe ELL 90 DEG MOLDED HDPE SDR 17 PE 4710 IPS, NPS 3.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe ELL 90 DEG MOLDED HDPE SDR 21 PE 4710 IPS, NPS 4.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe FLANGE ADAPTOR HDPE SDR 17 PE 4710 IPS, NPS 3.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe FLANGE ADAPTOR HDPE SDR 17 PE 4710 IPS, NPS 6.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe FLANGE ADAPTOR HDPE SDR 21 PE 4710 IPS, NPS 4.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPOXY COATED, NPS 3.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPOXY COATED, NPS 4.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPOXY COATED, NPS 6.00", Schedule
2610 Manejo de accesorios y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Butt Weld / Slip-on SS, NPS 10.00", Schedule SCH10S
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Butt Weld / Slip-on CS, NPS 12.00", Schedule SCH10S
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Butt Weld / Slip-on CS, NPS 12.00", Schedule SCH STD
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Butt Weld / Slip-on CS, NPS 6.00", Schedule SCH10S
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Butt Weld / Slip-on SS, NPS 6.00", Schedule SCH STD
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Butt Weld / Slip-on SS, NPS 8.00", Schedule SCH10S
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Socket Weld SS, NPS 2.00", Schedule SCH40S
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 6.00", Schedule SCH40S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 20.00", Schedule SCH STD
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 0.50", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE XS WELDED STL A53-F GALV T&C, NPS 3.00", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE SCH 10S EFW 316/316L SS A312, NPS 10.00", Schedule SCH10S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE SCH 10S EFW 316/316L SS A312, NPS 12.00", Schedule SCH10S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE SCH 10S EFW 316/316L SS A312, NPS 6.00", Schedule SCH10S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE SCH 10S EFW 316/316L SS A312, NPS 8.00", Schedule SCH10S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE SCH 40S SMLS 316/316L SS A312, NPS 2.00", Schedule SCH40S
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 304, NPS 0.50", Schedule SCH80S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 304, NPS 0.75", Schedule SCH80S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 304, NPS 2.00", Schedule SCH80S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 316, NPS 3.00", Schedule SCH10S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 316, NPS 3.00", Schedule SCH10S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F GALV T&C, NPS 3.00", Schedule SCH XS
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316L SS A312, NPS 10.00", Schedule SCH10S
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316L SS A312, NPS 12.00", Schedule SCH10S
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316L SS A312, NPS 6.00", Schedule SCH10S
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316L SS A312, NPS 8.00", Schedule SCH10S
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/316L SS A312, NPS 2.00", Schedule SCH40S
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE HDPE SDR 17 PE 4710 IPS, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE HDPE SDR 21 PE 4710 IPS, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 90 DEG 300# SCRD GALV MI A197, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe FLG SCRD 150# RF GALV STL A105, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe BA-10: BALL VALVE 2000 WOG SW SS RTFE 3-P HO, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe BU-23: BUTTERFLY LUG HP 150# SS 316 SS GO, NPS 12.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe BU-23: BUTTERFLY LUG HP 150# SS 316 SS GO, NPS 10.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 45 SCH 10S 316/316L SS A403-W, NPS 10.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 90 DEG 3000# SW 316/316L SS, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316L SS A403-W, NPS 10.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316L SS A403-W, NPS 12.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 90 LR SCH 10S 316/316L SS A403-W, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe FLG SO 150# RF 316/316L SS, NPS 10.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe FLG SO 150# RF 316/316L SS, NPS 12.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe FLG SO 150# RF 316/316L SS, NPS 8.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe FLG SW 150# RF 316/316L SS 40S BORE, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe REDUCER CONC SCH 10S 316/316L SS A403-W, NPS 8.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe RED TEE 10X6 SCH 10S 316/316L SS A403-W, NPS 10.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Butt Weld / Slip-on SS, NPS 10.00", Schedule SCH10S
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Butt Weld / Slip-on CS, NPS 12.00", Schedule SCH10S
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Butt Weld / Slip-on CS, NPS 12.00", Schedule SCH STD
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Butt Weld / Slip-on CS, NPS 6.00", Schedule SCH10S
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Butt Weld / Slip-on SS, NPS 6.00", Schedule SCH STD
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Butt Weld / Slip-on SS, NPS 8.00", Schedule SCH10S
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Butt Weld / Slip-on SS, NPS 2.00", Schedule SCH40S
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F GALV T&C, NPS 3.00", Schedule SCH XS
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316L SS A312, NPS 10.00", Schedule SCH10S
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316L SS A312, NPS 12.00", Schedule SCH10S
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316L SS A312, NPS 6.00", Schedule SCH10S
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 10S EFW 316/316L SS A312, NPS 8.00", Schedule SCH10S
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 40S SMLS 316/316L SS A312, NPS 2.00", Schedule SCH40S
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Transmisor Flujo Tipo Magnético


2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Transmisores de Presión sin/con Sello
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Sensor/Transmisor de Nivel Hidrostático
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Actuador eléctrico con interruptores de posición
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Rack Remoto (IO Block Terreno)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
Include Garza & Fluor Eng)

avation for Pipe trench


2610 Excavación para zanjas 100% CONSTRUCTEXECUTION FRONT 02

2610 Relleno de arena 100% CONSTRUCTEXECUTION FRONT 02

2610 Relleno para conductos 100% CONSTRUCTEXECUTION FRONT 02

2610 Relleno para conductos enterrados 100% CONSTRUCTEXECUTION FRONT 02

bricate - Butt Weld / Slip-on SS, NPS 18.00", Schedule SCH40S


2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Butt Weld / Slip-on SS, NPS 4.00", Schedule SCH STD
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
bricate - Butt Weld / Slip-on SS, NPS 6.00", Schedule SCH STD
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 6.00", Schedule SCH10S
2610 Realización del examen 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 18.00", Schedule SCH STD
2610 Realización del examen 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 20.00", Schedule SCH STD
2610 Realización del examen 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 6.00", Schedule SCH STD
2610 Realización del examen 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - RT, NPS 8.00", Schedule SCH STD
2610 Realización del examen 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E BE, NPS 4.00", Schedule SCH STD
2610 Realización del examen 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E BE, NPS 6.00", Schedule SCH STD
2610 Realización del examen 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE XS WELDED STL A53-F GALV T&C, NPS 2.00", Schedule SCH XS
2610 Realización del examen 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE XS WELDED STL A53-F GALV T&C, NPS 3.00", Schedule SCH XS
2610 Realización del examen 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE SCH 40S EFW 316/316L SS A312, NPS 18.00", Schedule SCH40S
2610 Realización del examen 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE SDR35 B&S C/W GASKET PVC D3034, NPS 4.00", Schedule
2610 Realización del examen 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE SDR35 B&S C/W GASKET PVC D3034, NPS 6.00", Schedule
2610 Realización del examen 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E BE, NPS 10.00", Schedule SCH STD
2610 Realización del examen 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A106, NPS 2.00", Schedule SCH XS pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A53, NPS 3.00", Schedule SCH STD pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of CS A53, NPS 4.00", Schedule SCH STD pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 304, NPS 0.75", Schedule SCH40S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 304, NPS 1.00", Schedule SCH80S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 316, NPS 3.00", Schedule SCH10S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 316, NPS 6.00", Schedule SCH10S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Double handling of SS 316, NPS 3.00", Schedule SCH40S pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe BA-08: BALL 1000 CWP SCRD SS RTFE 2-P HO, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe BA-08: BALL 1000 CWP SCRD SS RTFE 2-P HO, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe BA-08: BALL 1000 CWP SCRD SS RTFE 2-P HO, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe BA-08: BALL 1000 CWP SCRD SS RTFE 2-P HO, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe BA-08: BALL 1000 CWP SCRD SS RTFE 2-P HO, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe BA-08: BALL 1000 CWP SCRD SS RTFE 2-P HO, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe BA-08: BALL 1000 CWP SCRD SS RTFE 2-P HO, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe CAP STD WT STL A234 WPB, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe CAP STD WT STL A234 WPB, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 45 DEG STD WT STL A234 WPB, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 90 DEG 300# SCRD GALV MI A197, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 90 DEG LR STD WT STL A234 WPB, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 90 DEG LR STD WT STL A234 WPB, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe FLG BLIND 150# RF GALV STL A105, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe FLG SCRD 150# RF GALV STL A105, NPS 2.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe FLG SCRD 150# RF GALV STL A105, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe FLG SO 150# RF STL A105, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe FLG SO 150# RF STL A105, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe GA-19: GATE 150# RF CS A216 WCB HO, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe GL-10: GLOBE 150# RF CS F6/STEL SEAT, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe LATERAL STD WT STL A234 WPB-W, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe REDUCER 3x2 300# SCRD GALV MI A197, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe TEE RED 6x4 STD WT STL A234 WPB, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe TEE STD WT STL A234 WPB, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe TEE STD WT STL A234 WPB, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe ELL 90 LR SCH 40S 316/316SS A403-W, NPS 18.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe FLG SO 300# RF 316/316L SS, NPS 18.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Butt Weld / Slip-on SS, NPS 18.00", Schedule SCH40S
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Butt Weld / Slip-on SS, NPS 4.00", Schedule SCH STD
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Butt Weld / Slip-on SS, NPS 6.00", Schedule SCH STD
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 11 PE 4710 IPS, NPS 10.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 11 PE 4710 IPS, NPS 12.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 11 PE 4710 IPS, NPS 2.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 11 PE 4710 IPS, NPS 3.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 11 PE 4710 IPS, NPS 4.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 11 PE 4710 IPS, NPS 6.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 11 PE 4710 IPS, NPS 8.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 18.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 10.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 12.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 4.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 6.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 8.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 17 PE 4710 IPS, NPS 10.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 17 PE 4710 IPS, NPS 12.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 17 PE 4710 IPS, NPS 16.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 17 PE 4710 IPS, NPS 2.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 17 PE 4710 IPS, NPS 3.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 17 PE 4710 IPS, NPS 4.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 17 PE 4710 IPS, NPS 6.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 17 PE 4710 IPS, NPS 8.00", Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Thermo Fusion PIPE HDPE SDR 11 PE 4710 IPS, NPS , Schedule
2610 Realización de la Unión por termofusión de acero in 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 11 PE 4710 IPS, NPS 10.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 11 PE 4710 IPS, NPS 12.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 11 PE 4710 IPS, NPS 2.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 11 PE 4710 IPS, NPS 3.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 11 PE 4710 IPS, NPS 4.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 11 PE 4710 IPS, NPS 6.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 11 PE 4710 IPS, NPS 8.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 18.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 10.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 12.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 4.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 6.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 8.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 17 PE 4710 IPS, NPS 10.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 17 PE 4710 IPS, NPS 12.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 17 PE 4710 IPS, NPS 16.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 17 PE 4710 IPS, NPS 2.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 17 PE 4710 IPS, NPS 3.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 17 PE 4710 IPS, NPS 4.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 17 PE 4710 IPS, NPS 6.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 17 PE 4710 IPS, NPS 8.00", Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - UT, PIPE HDPE SDR 11 PE 4710 IPS, NPS , Schedule
2610 Realización de la Prueba de ultrasonido 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E BE, NPS 4.00", Schedule SCH STD
2610 Realización de la Prueba 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E BE, NPS 6.00", Schedule SCH STD
2610 Realización de la Prueba 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F GALV T&C, NPS 2.00", Schedule SCH XS
2610 Realización de la Prueba 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE XS WELDED STL A53-F GALV T&C, NPS 3.00", Schedule SCH XS
2610 Realización de la Prueba 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HANDLING of pipe PIPE SCH 40S EFW 316/316L SS A312, NPS 18.00", Schedule SCH40S
2610 Realización de la Prueba 70% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 30% CONSTRUCTEXECUTION FRONT 02
pply - Handling of pipe FH01: FIRE HYDRANT 200# FF CI/DI BARREL 3 VIAS, NPS 6.00", Schedule
2610 Instalación de Monitor Agua Contra Incendio / Hidr 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FH01: FIRE HYDRANT 200# FF CI/DI BARREL 3 VIAS, NPS 6.00", Schedule
2610 Instalación de Monitor Agua Contra Incendio / Hidr 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
pply - HOSE REEL
2610 Instalación de Carretes y Gabinetes de Mangueras 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HOSE REEL
2610 Instalación de Carretes y Gabinetes de Mangueras 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
pply - HOSE CABINET
2610 Instalación de Carretes y Gabinetes de Mangueras 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - HOSE CABINET
2610 Instalación de Carretes y Gabinetes de Mangueras 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE SDR35 B&S C/W GASKET PVC D3034, NPS 4.00", Schedule
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE SDR35 B&S C/W GASKET PVC D3034, NPS 6.00", Schedule
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 11 PE 4710 IPS, NPS 10.00", Schedule SDR 11
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 11 PE 4710 IPS, NPS 12.00", Schedule SDR 11
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 11 PE 4710 IPS, NPS 2.00", Schedule SDR 11
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 11 PE 4710 IPS, NPS 3.00", Schedule SDR 11
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 11 PE 4710 IPS, NPS 4.00", Schedule SDR 11
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 11 PE 4710 IPS, NPS 6.00", Schedule
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 11 PE 4710 IPS, NPS 8.00", Schedule
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 18.00", Schedule
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 10.00", Schedule
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 12.00", Schedule
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 4.00", Schedule
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 6.00", Schedule
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 13.5 PE 4710 IPS, NPS 8.00", Schedule
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 17 PE 4710 IPS, NPS 10.00", Schedule
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 17 PE 4710 IPS, NPS 12.00", Schedule
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 17 PE 4710 IPS, NPS 16.00", Schedule
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 17 PE 4710 IPS, NPS 2.00", Schedule
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 17 PE 4710 IPS, NPS 3.00", Schedule
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 17 PE 4710 IPS, NPS 4.00", Schedule
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 17 PE 4710 IPS, NPS 6.00", Schedule
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe PIPE HDPE SDR 17 PE 4710 IPS, NPS 8.00", Schedule
2610 Manejo, fabricación y montaje de tuberías en su posi 70% CONSTRUCTEXECUTION FRONT 02
2610 Pruebas, Limpieza 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe GA-09 GATE 125# FF DI W/VALVE BOX UL/FM HO, NPS 6.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe GA-05 GATE 125# FF DI UL/FM HO, NPS 4.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe GA-10 GATE 125# FF DI W/POST INDICATOR UL/FM HO, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe GA-10 GATE 125# FF DI W/POST INDICATOR UL/FM HO, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe GA-19 GATE 150# RF CS A216 WCB HO, NPS 4.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe BU-22 BUTTERFLY LUG HP 150# SS 316 SS LO, NPS 6.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe BU-22 BUTTERFLY LUG HP 150# SS 316 SS LO, NPS 3.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 22.5 DEG FAB HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 22.5 DEG FAB HDPE 160 PSI TO SDR 13.5 PE 4710 IPS, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 22.5 DEG FAB HDPE 160 PSI TO SDR 13.5 PE 4710 IPS, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 30 DEG FAB HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 30 DEG FAB HDPE 160 PSI TO SDR 13.5 PE 4710 IPS, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 30 DEG FAB HDPE 200 PSI TO SDR 11 PE 4710 IPS, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 45 DEG FAB HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 45 DEG FAB HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 16.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 45 DEG FAB HDPE 160 PSI TO SDR 13.5 PE 4710 IPS, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 45 DEG FAB HDPE 160 PSI TO SDR 13.5 PE 4710 IPS, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 45 DEG FAB HDPE 200 PSI TO SDR 11 PE 4710 IPS, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 45 DEG MOLDED HDPE SDR 11 PE 4710 IPS, NPS 3.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 45 DEG MOLDED HDPE SDR 11 PE 4710 IPS, NPS 6.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 45 DEG MOLDED HDPE SDR 13.5 PE 4710 IPS, NPS 4.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 45 DEG MOLDED HDPE SDR 17 PE 4710 IPS, NPS 2.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 45 DEG MOLDED HDPE SDR 17 PE 4710 IPS, NPS 3.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 45 DEG MOLDED HDPE SDR 17 PE 4710 IPS, NPS 6.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 45 DEG SDR35 BxS W/GASKET PVC D3034, NPS 4.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 60 DEG FAB HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 90 DEG FAB HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 90 DEG FAB HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 90 DEG FAB HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 16.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 90 DEG FAB HDPE 160 PSI TO SDR 13.5 PE 4710 IPS, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 90 DEG FAB HDPE 160 PSI TO SDR 13.5 PE 4710 IPS, NPS 18.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 90 DEG FAB HDPE 200 PSI TO SDR 11 PE 4710 IPS, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 90 DEG FAB HDPE 200 PSI TO SDR 11 PE 4710 IPS, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SDR 11 PE 4710 IPS, NPS 2.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SDR 11 PE 4710 IPS, NPS 3.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SDR 11 PE 4710 IPS, NPS 4.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SDR 11 PE 4710 IPS, NPS 6.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SDR 11 PE 4710 IPS, NPS 8.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SDR 13.5 PE 4710 IPS, NPS 4.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SDR 13.5 PE 4710 IPS, NPS 6.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SDR 17 PE 4710 IPS, NPS 3.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SDR 17 PE 4710 IPS, NPS 6.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe ELL 90 DEG MOLDED HDPE SDR 17 PE 4710 IPS, NPS 8.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FIRE HYDRANT 200# FF CI/DI BARREL 3 VIAS, NPS 6.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 11 PE 4710 IPS, NPS 2.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 11 PE 4710 IPS, NPS 3.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 11 PE 4710 IPS, NPS 4.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 11 PE 4710 IPS, NPS 6.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 11 PE 4710 IPS, NPS 8.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 11 PE 4710 IPS, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 11 PE 4710 IPS, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 13.5 PE4710 IPS, NPS 4.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 13.5 PE4710 IPS, NPS 6.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 13.5 PE4710 IPS, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 13.5 PE4710 IPS, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 13.5 PE4710 IPS, NPS 18.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 17 PE 4710 IPS, NPS 2.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 17 PE 4710 IPS, NPS 3.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 17 PE 4710 IPS, NPS 4.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 17 PE 4710 IPS, NPS 6.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 17 PE 4710 IPS, NPS 8.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 17 PE 4710 IPS, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLANGE ADAPTOR HDPE SDR 17 PE 4710 IPS, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPOXY COATED, NPS 2.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPOXY COATED, NPS 3.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPOXY COATED, NPS 4.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPOXY COATED, NPS 6.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPOXY COATED, NPS 8.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPOXY COATED, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLG BACKING, CONV, 150 PSI, DI EPOXY COATED, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLG BACKING, CONV, 252 PSI, DI EPOXY COATED, NPS 2.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLG BACKING, CONV, 252 PSI, DI EPOXY COATED, NPS 3.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLG BACKING, CONV, 252 PSI, DI EPOXY COATED, NPS 4.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLG BACKING, CONV, 252 PSI, DI EPOXY COATED, NPS 6.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLG BACKING, CONV, 252 PSI, DI EPOXY COATED, NPS 8.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLG BACKING, CONV, 252 PSI, DI EPOXY COATED, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLG BACKING, CONV, 252 PSI, DI EPOXY COATED, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLG BACKING, CONV, 252 PSI, DI EPOXY COATED, NPS 18.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLG BLIND 150# FF STL A105, NPS 3.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLG BLIND 150# FF STL A105, NPS 8.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe FLG BLIND 150# FF STL A105, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe BU-23 BUTTERFLY LUG HP 150# SS 316 SS GO, NPS 8.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe GA-05 GATE 125# FF DI UL/FM HO, NPS 8.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe GA-10 GATE 125# FF DI W/POST INDICATOR UL/FM HO, NPS 8.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe GA-05 GATE 125# FF DI UL/FM HO, NPS 4.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe GA-09 GATE 125# FF DI W/VALVE BOX UL/FM HO, NPS 6.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe BU-22 BUTTERFLY LUG HP 150# SS 316 SS LO, NPS 2.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe BU-22 BUTTERFLY LUG HP 150# SS 316 SS LO, NPS 4.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe RED CONC 8x6 FAB HDPE 160 PSI TO SDR 13.5 PE 4710 IPS, NPS 8.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe RED CONC 10x8 FAB HDPE 160 PSI TO SDR 13.5 PE 4710 IPS, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe RED CONC 6x3 HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 6.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe RED CONC 8x6 HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 8.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe RED CONC 10x8 HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe RED CONC 12x10 HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe RED CONC 20x8 HDPE 255 PSI TO SDR 9 PE 4710 IPS, NPS 20.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe TEE FAB HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe TEE FAB HDPE 160 PSI TO SDR 13.5 PE 4710 IPS, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe TEE FAB HDPE 200 PSI TO SDR 11 PE 4710 IPS, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe TEE MOLDED HDPE SDR 11 PE 4710 IPS, NPS 8.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe TEE MOLDED HDPE SDR 17 PE 4710 IPS, NPS 6.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe TEE RED 6x4 FAB HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 6.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe TEE RED 8x6 FAB HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 8.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe TEE RED 10x6 FAB HDPE 130 PSI TO SDR 17 PE 4710 IPS, NPS 10.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe TEE RED 8x6 FAB HDPE 160 PSI TO SDR 13.5 PE 4710 IPS, NPS 8.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe TEE RED 12x4 FAB HDPE 160 PSI TO SDR 13.5 PE 4710 IPS, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe TEE RED 12x6 FAB HDPE 160 PSI TO SDR 13.5 PE 4710 IPS, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe TEE RED 12x10 FAB HDPE 160 PSI TO SDR 13.5 PE 4710 IPS, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe TEE RED 3x2 FAB HDPE 200 PSI TO SDR 11 PE 4710 IPS, NPS 3.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe TEE RED FAB 8x3 HDPE 200 PSI TO SDR 11 PE 4710 IPS, NPS 8.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe TEE RED FAB 8x4 HDPE 200 PSI TO SDR 11 PE 4710 IPS, NPS 8.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe TEE RED FAB 8x6 HDPE 200 PSI TO SDR 11 PE 4710 IPS, NPS 8.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02
tall / Perform - Handling of pipe TEE RED FAB 12x6 HDPE 200 PSI TO SDR 11 PE 4710 IPS, NPS 12.00", Schedule
2610 Instalación mecánica en su posición final 90% CONSTRUCTEXECUTION FRONT 02
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 02

ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”


2920 Suministro y Colocacion en Potable Water Tank (29 50% CONSTRUCTEXECUTION FRONT 02
2920 Limpieza en Potable Water Tank (2920-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2920 Recepcion de Protocolo Topografico sin observacio 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2920 Suministro y Colocacion en Potable Water Tank (29 50% CONSTRUCTEXECUTION FRONT 02
2920 Limpieza en Potable Water Tank (2920-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2920 Recepcion de Protocolo Topografico sin observacio 40% CONSTRUCTEXECUTION FRONT 02
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2920 Suministro y Colocacion en Potable Water Tank (29 50% CONSTRUCTEXECUTION FRONT 02
2920 Limpieza en Potable Water Tank (2920-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2920 Recepcion de Protocolo Topografico sin observacio 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2920 Suministro y Colocacion en Potable Water Tank (29 50% CONSTRUCTEXECUTION FRONT 02
2920 Limpieza en Potable Water Tank (2920-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2920 Recepcion de Protocolo Topografico sin observacio 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2”
2920 Suministro y Colocacion en Potable Water Tank (29 50% CONSTRUCTEXECUTION FRONT 02
2920 Limpieza en Potable Water Tank (2920-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2920 Recepcion de Protocolo Topografico sin observacio 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2” con camisa
2920 Suministro y Colocacion en Potable Water Tank (29 50% CONSTRUCTEXECUTION FRONT 02
2920 Limpieza en Potable Water Tank (2920-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2920 Recepcion de Protocolo Topografico sin observacio 40% CONSTRUCTEXECUTION FRONT 02
ministro - Inserto estándar ASTM A36 Peso < 200 kg
2920 Suministro y Colocacion en Potable Water Tank (29 50% CONSTRUCTEXECUTION FRONT 02
2920 Limpieza en Potable Water Tank (2920-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2920 Recepcion de Protocolo Topografico sin observacio 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
2920 Suministro y Colocacion en Potable Water Tank (29 50% CONSTRUCTEXECUTION FRONT 02
2920 Limpieza en Potable Water Tank (2920-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2920 Recepcion de Protocolo Topografico sin observacio 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 12- Cimentación y Pedestal Octogonal
2920 Suministro en Potable Water Tank (2920-TK-001) 30% CONSTRUCTEXECUTION FRONT 02
2920 Cortado en Potable Water Tank (2920-TK-001) 15% CONSTRUCTEXECUTION FRONT 02
2920 Doblado en Potable Water Tank (2920-TK-001) 15% CONSTRUCTEXECUTION FRONT 02
2920 Punch List Completado sin observaciones en Potabl 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 26- Muro e<= 0.4m
2920 Suministro en Potable Water Tank (2920-TK-001) 30% CONSTRUCTEXECUTION FRONT 02
2920 Cortado en Potable Water Tank (2920-TK-001) 15% CONSTRUCTEXECUTION FRONT 02
2920 Doblado en Potable Water Tank (2920-TK-001) 15% CONSTRUCTEXECUTION FRONT 02
2920 Punch List Completado sin observaciones en Potabl 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 40- Losa de Piso Incluye Sumidero y Sobre-espesores
2920 Suministro en Potable Water Tank (2920-TK-001) 30% CONSTRUCTEXECUTION FRONT 02
2920 Cortado en Potable Water Tank (2920-TK-001) 15% CONSTRUCTEXECUTION FRONT 02
2920 Doblado en Potable Water Tank (2920-TK-001) 15% CONSTRUCTEXECUTION FRONT 02
2920 Punch List Completado sin observaciones en Potabl 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 12- Cimentación y Pedestal Octogonal - Concreto f´c =280 kg/cm2
2920 Colocacion de Acero de Refuerzo en Potable Water 10% CONSTRUCTEXECUTION FRONT 02
2920 Colocacion de Encofrado en Potable Water Tank (29 20% CONSTRUCTEXECUTION FRONT 02
2920 Vaciado de Concreto en Potable Water Tank (2920- 45% CONSTRUCTEXECUTION FRONT 02
2920 Descimbre en Potable Water Tank (2920-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2920 Limpieza en Potable Water Tank (2920-TK-001) 5% CONSTRUCTEXECUTION FRONT 02
2920 Punch List Completado sin observaciones en Potabl 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 26- Muro e<= 0.4m - Concreto f´c =280 kg/cm2
2920 Colocacion de Acero de Refuerzo en Potable Water 10% CONSTRUCTEXECUTION FRONT 02
2920 Colocacion de Encofrado en Potable Water Tank (29 20% CONSTRUCTEXECUTION FRONT 02
2920 Colocacion Topografica de Insertos Estandar y Pern 10% CONSTRUCTEXECUTION FRONT 02
2920 Vaciado de Concreto en Potable Water Tank (2920- 35% CONSTRUCTEXECUTION FRONT 02
2920 Descimbre en Potable Water Tank (2920-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2920 Limpieza en Potable Water Tank (2920-TK-001) 5% CONSTRUCTEXECUTION FRONT 02
2920 Punch List Completado sin observaciones en Potabl 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 40- Losa de Piso Incluye Sumidero y Sobre-espesores - Concreto f´c
2920 Colocacion de Acero de Refuerzo en Potable Water 10% CONSTRUCTEXECUTION FRONT 02
2920 Colocacion de Encofrado en Potable Water Tank (29 20% CONSTRUCTEXECUTION FRONT 02
2920 Vaciado de Concreto en Potable Water Tank (2920- 45% CONSTRUCTEXECUTION FRONT 02
2920 Descimbre en Potable Water Tank (2920-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2920 Limpieza en Potable Water Tank (2920-TK-001) 5% CONSTRUCTEXECUTION FRONT 02
2920 Punch List Completado sin observaciones en Potabl 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 64- Banco de Ductos Reforzado - Concreto f´c =150 kg/cm2
2920 Colocacion de Acero de Refuerzo en Potable Water 10% CONSTRUCTEXECUTION FRONT 02
2920 Colocacion de Encofrado en Potable Water Tank (29 20% CONSTRUCTEXECUTION FRONT 02
2920 Colocacion Ductos en Potable Water Tank (2920-TK- 15% CONSTRUCTEXECUTION FRONT 02
2920 Vaciado de Concreto en Potable Water Tank (2920- 30% CONSTRUCTEXECUTION FRONT 02
2920 Descimbre en Potable Water Tank (2920-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2920 Limpieza en Potable Water Tank (2920-TK-001) 5% CONSTRUCTEXECUTION FRONT 02
2920 Punch List Completado sin observaciones en Potabl 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 61- Solado - Concreto f´c =100 kg/cm2
2920 Colocacion de Encofrado en Potable Water Tank (29 25% CONSTRUCTEXECUTION FRONT 02
2920 Vaciado de Concreto en Potable Water Tank (2920- 30% CONSTRUCTEXECUTION FRONT 02
2920 Descimbre en Potable Water Tank (2920-TK-001) 25% CONSTRUCTEXECUTION FRONT 02
2920 Limpieza en Potable Water Tank (2920-TK-001) 10% CONSTRUCTEXECUTION FRONT 02
2920 Punch List Completado sin observaciones en Potabl 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Escalerilla portaconductores, acero galvanizado en caliente, 150x100 mm


2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 3/4"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero flexible y cubierta de PVC resistente a la radiación UV, diámetro 3/4"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 8 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 14 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x4c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 16 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 16 AWG, 1x5c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable Profibus PA 1x1p;# 18 AWG, Tipo A
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable Profibus DP 1x1p;# 22 AWG Tipo A
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 12 AWG, 1x1c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de fuerza, cobre, aislado, clase 600 V, #8 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Ground Rod 3/4"x3m (Supplied and installed by Contractor)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 14, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 02
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 3 X 16 AWG, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 02
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Indicadores de Presión sin/con Sello


2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Indicador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02

r Treatment Plant

ntaje / Ejecución - PLANTA DE AGUA POTABLE- AREA MINA ; 4,38 M3/HAGUA POTABLE ; 50 kW
2930 Recepcion y traslado de elementos a obra en Rever 10% CONSTRUCTEXECUTION FRONT 02
2930 Montaje elementos estructurales en Reverse Osmos 10% CONSTRUCTEXECUTION FRONT 02
2930 Montaje equipos mecanicos en Reverse Osmosis And 50% CONSTRUCTEXECUTION FRONT 02
2930 Conexionado (*), Pruebas e Inspeccion en Reverse 20% CONSTRUCTEXECUTION FRONT 02
2930 Protocolo
ntaje / Ejecución - PLANTA Entrega
OSMOSIS deINVERSA
Equipos en Reverse Osmosis A 10% CONSTRUCTEXECUTION FRONT 02
M3/H AGUA RO ; 50 kW
2930 Recepcion y traslado de elementos a obra en Rever 10% CONSTRUCTEXECUTION FRONT 02
2930 Montaje elementos estructurales en Reverse Osmos 10% CONSTRUCTEXECUTION FRONT 02
2930 Montaje equipos mecanicos en Reverse Osmosis And 50% CONSTRUCTEXECUTION FRONT 02
2930 Conexionado (*), Pruebas e Inspeccion en Reverse 20% CONSTRUCTEXECUTION FRONT 02
2930 Protocolo Entrega de Equipos en Reverse Osmosis A 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Escalerilla portaconductores, acero galvanizado en caliente, 150x100 mm


2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 3/4"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero flexible y cubierta de PVC resistente a la radiación UV, diámetro 3/4"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 8 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 14 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x4c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 16 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 16 AWG, 1x5c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable Profibus PA 1x1p;# 18 AWG, Tipo A
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable Profibus DP 1x1p;# 22 AWG Tipo A
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 12 AWG, 1x1c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de fuerza, cobre, aislado, clase 600 V, #8 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Ground Rod 3/4"x3m (Supplied and installed by Contractor)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 14, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 02
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 3 X 16 AWG, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 02
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 02
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 02
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Transmisor de Nivel Tipo Radar Flanged


2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Rack Remoto (IO Block Terreno)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02

encuentra en Bill Quantity)

ntaje / Ejecución - PLANTA TRATAMIENTO AGUAS SERVIDAS - AREA MINA ; 69 M3/DIA ; 10kW
2940 Recepcion y traslado de elementos a obra en Mine 10% CONSTRUCTEXECUTION FRONT 02
2940 Montaje elementos estructurales en Mine Sewage T 10% CONSTRUCTEXECUTION FRONT 02
2940 Montaje equipos mecanicos en Mine Sewage Treatm 50% CONSTRUCTEXECUTION FRONT 02
2940 Conexionado (*), Pruebas e Inspeccion en Mine Sew 20% CONSTRUCTEXECUTION FRONT 02
2940 Protocolo Entrega de Equipos en Mine Sewage Trea 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Escalerilla portaconductores, acero galvanizado en caliente, 600x100 mm


2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Escalerilla portaconductores, acero galvanizado en caliente, 300x100 mm
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 3/4"
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 1"
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 1 1/2"
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 2"
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 3"
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero flexible y cubierta de PVC resistente a la radiación UV, diámetro 3/4"
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit directamente enterrado, acero galvanizado en caliente ANSI C80.1, diámetro 1"
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit en banco de ductos, PVC Schedule 40, diámetro 4"
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit en banco de ductos, PVC Schedule 40, diámetro 6"
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de cobre, clase 25 kV, apantallado, aislamiento de XLPE, IL=100%, # 1/0 AWG, 1x3c+SH
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, 350 kcmil, 1x1c+SH
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, # 4 AWG, 1x3c+SH
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, 350 kcmil, 1x1c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 1 AWG, 1x3c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 10 AWG, 1x3c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x3c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 2 AWG, 1x3c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 4 AWG, 1x3c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x3c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 8 AWG, 1x3c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x4c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 14 AWG, 1x5c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multi-triada, conductor de cobre, clase 300 V, aislamiento de PVC, # 18 AWG, 1x4T (+Pantalla por triada y total)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multi-triada, conductor de cobre, clase 300 V, aislamiento de PVC, # 18 AWG, 1x8T (+Pantalla por triada y total)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 10 AWG, 1x1c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 12 AWG, 1x1c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de cobre, clase 25 kV, apantallado, aislamiento de XLPE, IL=100%, # 1/0 AWG, 1x3c+SH
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, 350 kcmil, 1x1c+SH
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, # 4/0 AWG, 1x3c+T+SH
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, # 4 AWG, 1x3c+SH
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, 350 kcmil, 1x1c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 1 AWG, 1x3c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 8 AWG, 1x3c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 10 AWG, 1x3c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x3c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 14 AWG, 1x3c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 2 AWG, 1x3c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 4 AWG, 1x3c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x3c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 8 AWG, 1x3c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 10 AWG, 1x3c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 1 AWG, 1x4c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x4c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 14 AWG, 1x5c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 16 AWG, 1x3c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 16 AWG, 1x5c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multi-triada, conductor de cobre, clase 300 V, aislamiento de PVC, # 18 AWG, 1x4T (+Pantalla por triada y total)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multi-triada, conductor de cobre, clase 300 V, aislamiento de PVC, # 18 AWG, 1x8T (+Pantalla por triada y total)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable Profibus PA 1x1p;# 18 AWG, Tipo A
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable Profibus DP 1x1p;# 22 AWG Tipo A
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable Ethernet (UTP)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 12 AWG, 1x1c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de fuerza, cobre, aislado, clase 600 V, #8 AWG
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Ground Rod 3/4"x3m (Supplied and installed by Contractor)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conexionado Cable de Aterrizamiento 1x1c;8 AWG
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", con base horizontal, montado en poste recto ortogonal de acero galvan
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 1/0, 25 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 1/0, 25 KV, SHLD, SHRINKABLE, 100-133 % I.L., OUT
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - CABLE TERMINATION KIT, 1/C MCM 350, 5 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - CABLE TERMINATION KIT, 1/C AWG 4/0, 5 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 4, 5 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, SINGLE CONDUCTOR, 1/C MCM 350, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 1, XLPE/LSZH, BLACK JACKET
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 10, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 12, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 14, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 2, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 4, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 6, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 8, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 10, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 1, XLPE/LSZH, BLACK JACKET
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 6, XLPE/PVC, BLACK JACKET
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 5 x 14 AWG, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 3 X 16 AWG, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI TRIAD, 4 x 18 AWG INDIVIDUAL & OVERALL SH
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI TRIAD, 8 x 18 AWG INDIVIDUAL & OVERALL SH
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE CONDUCTOR, 1/C AWG 10, HALOGEN FREE, RED
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Estación de control local (Botonera), "Parada Emergencia / JOG", acero galvanizado, NEMA 4
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - THREE PHASE RECEPTACLE ASSEMBLY, 600 V, 63 AMP, 3 PH+G , 63 x 600 m
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - SINGLE PHASE RECEPTACLE ASSEMBLY, 600 V, 16 AMP, 1 PH+G , 16 x 600 m
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Proyector industrial LED, montaje en muro o columna, 531 W
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Equipo alumbrado público (1 unidad), LED, montaje en poste recto ortogonal de acero galvanizado de 9 m, 258 W
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - DISTRIBUTION TRANSFORMER, 500 kVA, 22900/480 V, Dyn1, KNAN, 65°C, SILICONE OIL IMMERSED (TAG No.: XX
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - DISTRIBUTION TRANSFORMER, 150 kVA, 480/400-231 V, Dyn1, KNAN, 65°C, SILICONE OIL IMMERSED (TAG No.: X
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G, 480 V, 20 kA
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G, 400-231 V, 14 kA
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G, 208-120 V, 10 kA
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 2P, 125 V (dc), 5 kA
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
BREAKER, 630 2950
A Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
XXX-XX)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
BREAKER, 600 2950
A Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
XXX-XX)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
REAKER, 1200 2950
A Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
R, 400 A
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
REAKER, 1200 2950
A Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
R, 400 A
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - MOTOR CONTROL CENTER, 480 V, 1200 A, 65 kA
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - BATTERY CHARGER, 400 V-125 V (dc)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - BATTERY BANK, 125 V (dc)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
nstallation of Electrical Room
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02

b-station & Eroon (2950-ER-001)


ra en Bill Quantity, solo el paquete 8)
ounding system excavation
2610 Excavación para puesta a tierra 100% CONSTRUCTEXECUTION FRONT 02
ried Conduit excavation
2610 Excavación para conductos enterrados 100% CONSTRUCTEXECUTION FRONT 02
uct Bank excavation
2610 Excavación para bancoductos 100% CONSTRUCTEXECUTION FRONT 02
Manhole excavation
2610 Excavación para manholes 100% CONSTRUCTEXECUTION FRONT 02
ounding system backfill and compaction
2610 Relleno para puesta a tierra 100% CONSTRUCTEXECUTION FRONT 02
ried conduit backfill and compaction
2610 Relleno para conductos enterrados 100% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Duct Bank backfill and compaction
2610 Relleno de bancoductos 100% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Manhole backfill and compaction
2610 Relleno y compactación para manholes 100% CONSTRUCTEXECUTION FRONT 02

ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”


2950 Suministro y Colocacion en Mine Pit Reclaim Water 50% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 10% CONSTRUCTEXECUTION FRONT 02
2950 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”
2950 Suministro y Colocacion en Mine Pit Reclaim Water 50% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 10% CONSTRUCTEXECUTION FRONT 02
2950 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2950 Suministro y Colocacion en Mine Pit Reclaim Water 50% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 10% CONSTRUCTEXECUTION FRONT 02
2950 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2950 Suministro y Colocacion en Mine Pit Reclaim Water 50% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 10% CONSTRUCTEXECUTION FRONT 02
2950 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2950 Suministro y Colocacion en Mine Pit Reclaim Water 50% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 10% CONSTRUCTEXECUTION FRONT 02
2950 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2950 Suministro y Colocacion en Mine Pit Reclaim Water 50% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 10% CONSTRUCTEXECUTION FRONT 02
2950 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2950 Suministro y Colocacion en Mine Pit Reclaim Water 50% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 10% CONSTRUCTEXECUTION FRONT 02
2950 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2950 Suministro y Colocacion en Mine Pit Reclaim Water 50% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 10% CONSTRUCTEXECUTION FRONT 02
2950 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro - Inserto estándar ASTM A36 Peso < 200 kg
2950 Suministro y Colocacion en Mine Pit Reclaim Water 50% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 10% CONSTRUCTEXECUTION FRONT 02
2950 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
2950 Suministro y Colocacion en Mine Pit Reclaim Water 50% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 10% CONSTRUCTEXECUTION FRONT 02
2950 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 01- Cimentación Aislada, vol <8m3
2950 Suministro en Mine Pit Reclaim Water Storage Sub-s 30% CONSTRUCTEXECUTION FRONT 02
2950 Cortado en Mine Pit Reclaim Water Storage Sub-sta 15% CONSTRUCTEXECUTION FRONT 02
2950 Doblado en Mine Pit Reclaim Water Storage Sub-sta 15% CONSTRUCTEXECUTION FRONT 02
2950 Punch List Completado en Mine Pit Reclaim Water S 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 02- Cimentación Continua
2950 Suministro en Mine Pit Reclaim Water Storage Sub-s 30% CONSTRUCTEXECUTION FRONT 02
2950 Cortado en Mine Pit Reclaim Water Storage Sub-sta 15% CONSTRUCTEXECUTION FRONT 02
2950 Doblado en Mine Pit Reclaim Water Storage Sub-sta 15% CONSTRUCTEXECUTION FRONT 02
2950 Punch List Completado en Mine Pit Reclaim Water S 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 05- Losa Cimentación e < 1m
2950 Suministro en Mine Pit Reclaim Water Storage Sub-s 30% CONSTRUCTEXECUTION FRONT 02
2950 Cortado en Mine Pit Reclaim Water Storage Sub-sta 15% CONSTRUCTEXECUTION FRONT 02
2950 Doblado en Mine Pit Reclaim Water Storage Sub-sta 15% CONSTRUCTEXECUTION FRONT 02
2950 Punch List Completado en Mine Pit Reclaim Water S 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 06- Losa Cimentación 1m <= e < 2m
2950 Suministro en Mine Pit Reclaim Water Storage Sub-s 30% CONSTRUCTEXECUTION FRONT 02
2950 Cortado en Mine Pit Reclaim Water Storage Sub-sta 15% CONSTRUCTEXECUTION FRONT 02
2950 Doblado en Mine Pit Reclaim Water Storage Sub-sta 15% CONSTRUCTEXECUTION FRONT 02
2950 Punch List Completado en Mine Pit Reclaim Water S 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 09- Pedestal Sección <= 1m2
2950 Suministro en Mine Pit Reclaim Water Storage Sub-s 30% CONSTRUCTEXECUTION FRONT 02
2950 Cortado en Mine Pit Reclaim Water Storage Sub-sta 15% CONSTRUCTEXECUTION FRONT 02
2950 Doblado en Mine Pit Reclaim Water Storage Sub-sta 15% CONSTRUCTEXECUTION FRONT 02
2950 Punch List Completado en Mine Pit Reclaim Water S 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 26- Muro e<= 0.4m
2950 Suministro en Mine Pit Reclaim Water Storage Sub-s 30% CONSTRUCTEXECUTION FRONT 02
2950 Cortado en Mine Pit Reclaim Water Storage Sub-sta 15% CONSTRUCTEXECUTION FRONT 02
2950 Doblado en Mine Pit Reclaim Water Storage Sub-sta 15% CONSTRUCTEXECUTION FRONT 02
2950 Punch List Completado en Mine Pit Reclaim Water S 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 64- Banco de Ductos Reforzado
2950 Suministro en Mine Pit Reclaim Water Storage Sub-s 30% CONSTRUCTEXECUTION FRONT 02
2950 Cortado en Mine Pit Reclaim Water Storage Sub-sta 15% CONSTRUCTEXECUTION FRONT 02
2950 Doblado en Mine Pit Reclaim Water Storage Sub-sta 15% CONSTRUCTEXECUTION FRONT 02
2950 Punch List Completado en Mine Pit Reclaim Water S 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 69- Cámara
2950 Suministro en Mine Pit Reclaim Water Storage Sub-s 30% CONSTRUCTEXECUTION FRONT 02
2950 Cortado en Mine Pit Reclaim Water Storage Sub-sta 15% CONSTRUCTEXECUTION FRONT 02
2950 Doblado en Mine Pit Reclaim Water Storage Sub-sta 15% CONSTRUCTEXECUTION FRONT 02
2950 Punch List Completado en Mine Pit Reclaim Water S 40% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 69- Cámara - Concreto f´c =210 kg/cm2
2950 Colocacion de Acero de Refuerzo en Mine Pit Reclai 10% CONSTRUCTEXECUTION FRONT 02
2950 Colocacion de Encofrado en Mine Pit Reclaim Water 20% CONSTRUCTEXECUTION FRONT 02
2950 Colocacion Topografica de Insertos Estandar y Pern 10% CONSTRUCTEXECUTION FRONT 02
2950 Vaciado de Concreto en Mine Pit Reclaim Water Sto 35% CONSTRUCTEXECUTION FRONT 02
2950 Descimbre en Mine Pit Reclaim Water Storage Sub-s 10% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 5% CONSTRUCTEXECUTION FRONT 02
2950 Punch List Completado en Mine Pit Reclaim Water S 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 01- Cimentación Aislada, vol <8m3 - Concreto f´c =280 kg/cm2
2950 Colocacion de Acero de Refuerzo en Mine Pit Reclai 10% CONSTRUCTEXECUTION FRONT 02
2950 Colocacion de Encofrado en Mine Pit Reclaim Water 20% CONSTRUCTEXECUTION FRONT 02
2950 Vaciado de Concreto en Mine Pit Reclaim Water Sto 45% CONSTRUCTEXECUTION FRONT 02
2950 Descimbre en Mine Pit Reclaim Water Storage Sub-s 10% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 5% CONSTRUCTEXECUTION FRONT 02
2950 Punch List Completado en Mine Pit Reclaim Water S 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 02- Cimentación Continua - Concreto f´c =280 kg/cm2
2950 Colocacion de Acero de Refuerzo en Mine Pit Reclai 10% CONSTRUCTEXECUTION FRONT 02
2950 Colocacion de Encofrado en Mine Pit Reclaim Water 20% CONSTRUCTEXECUTION FRONT 02
2950 Vaciado de Concreto en Mine Pit Reclaim Water Sto 45% CONSTRUCTEXECUTION FRONT 02
2950 Descimbre en Mine Pit Reclaim Water Storage Sub-s 10% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 5% CONSTRUCTEXECUTION FRONT 02
2950 Punch List Completado en Mine Pit Reclaim Water S 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 05- Losa Cimentación e < 1m - Concreto f´c =280 kg/cm2
2950 Colocacion de Acero de Refuerzo en Mine Pit Reclai 10% CONSTRUCTEXECUTION FRONT 02
2950 Colocacion de Encofrado en Mine Pit Reclaim Water 20% CONSTRUCTEXECUTION FRONT 02
2950 Vaciado de Concreto en Mine Pit Reclaim Water Sto 45% CONSTRUCTEXECUTION FRONT 02
2950 Descimbre en Mine Pit Reclaim Water Storage Sub-s 10% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 5% CONSTRUCTEXECUTION FRONT 02
2950 Punch List Completado en Mine Pit Reclaim Water S 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 06- Losa Cimentación 1m <= e < 2m - Concreto f´c =280 kg/cm2
2950 Colocacion de Acero de Refuerzo en Mine Pit Reclai 10% CONSTRUCTEXECUTION FRONT 02
2950 Colocacion de Encofrado en Mine Pit Reclaim Water 20% CONSTRUCTEXECUTION FRONT 02
2950 Vaciado de Concreto en Mine Pit Reclaim Water Sto 45% CONSTRUCTEXECUTION FRONT 02
2950 Descimbre en Mine Pit Reclaim Water Storage Sub-s 10% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 5% CONSTRUCTEXECUTION FRONT 02
2950 Punch List Completado en Mine Pit Reclaim Water S 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 09- Pedestal Sección <= 1m2 - Concreto f´c =280 kg/cm2
2950 Colocacion de Acero de Refuerzo en Mine Pit Reclai 10% CONSTRUCTEXECUTION FRONT 02
2950 Colocacion de Encofrado en Mine Pit Reclaim Water 20% CONSTRUCTEXECUTION FRONT 02
2950 Colocacion Topografica de Insertos Estandar y Pern 10% CONSTRUCTEXECUTION FRONT 02
2950 Vaciado de Concreto en Mine Pit Reclaim Water Sto 35% CONSTRUCTEXECUTION FRONT 02
2950 Descimbre en Mine Pit Reclaim Water Storage Sub-s 10% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 5% CONSTRUCTEXECUTION FRONT 02
2950 Punch List Completado en Mine Pit Reclaim Water S 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 26- Muro e<= 0.4m - Concreto f´c =280 kg/cm2
2950 Colocacion de Acero de Refuerzo en Mine Pit Reclai 10% CONSTRUCTEXECUTION FRONT 02
2950 Colocacion de Encofrado en Mine Pit Reclaim Water 20% CONSTRUCTEXECUTION FRONT 02
2950 Colocacion Topografica de Insertos Estandar y Pern 10% CONSTRUCTEXECUTION FRONT 02
2950 Vaciado de Concreto en Mine Pit Reclaim Water Sto 35% CONSTRUCTEXECUTION FRONT 02
2950 Descimbre en Mine Pit Reclaim Water Storage Sub-s 10% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 5% CONSTRUCTEXECUTION FRONT 02
2950 Punch List Completado en Mine Pit Reclaim Water S 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 64- Banco de Ductos Reforzado - Concreto f´c =150 kg/cm2
2950 Colocacion de Acero de Refuerzo en Mine Pit Reclai 10% CONSTRUCTEXECUTION FRONT 02
2950 Colocacion de Encofrado en Mine Pit Reclaim Water 20% CONSTRUCTEXECUTION FRONT 02
2950 Colocación de ductos en Mine Pit Reclaim Water Sto 15% CONSTRUCTEXECUTION FRONT 02
2950 Vaciado de Concreto en Mine Pit Reclaim Water Sto 30% CONSTRUCTEXECUTION FRONT 02
2950 Descimbre en Mine Pit Reclaim Water Storage Sub-s 10% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 5% CONSTRUCTEXECUTION FRONT 02
2950 Punch List Completado en Mine Pit Reclaim Water S 10% CONSTRUCTEXECUTION FRONT 02
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 61- Solado - Concreto f´c =100 kg/cm2
2950 Colocacion de Encofrado en Mine Pit Reclaim Water 25% CONSTRUCTEXECUTION FRONT 02
2950 Vaciado de Concreto en Mine Pit Reclaim Water Sto 30% CONSTRUCTEXECUTION FRONT 02
2950 Descimbre en Mine Pit Reclaim Water Storage Sub-s 25% CONSTRUCTEXECUTION FRONT 02
2950 Limpieza en Mine Pit Reclaim Water Storage Sub-sta 10% CONSTRUCTEXECUTION FRONT 02
2950 Punch List Completado en Mine Pit Reclaim Water S 10% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Escalerilla portaconductores, acero galvanizado en caliente, 600x100 mm


2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Escalerilla portaconductores, acero galvanizado en caliente, 300x100 mm
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 3/4"
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 1"
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 1 1/2"
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 2"
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 3"
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit a la vista, acero flexible y cubierta de PVC resistente a la radiación UV, diámetro 3/4"
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit directamente enterrado, acero galvanizado en caliente ANSI C80.1, diámetro 1"
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit en banco de ductos, PVC Schedule 40, diámetro 4"
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conduit en banco de ductos, PVC Schedule 40, diámetro 6"
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de cobre, clase 25 kV, apantallado, aislamiento de XLPE, IL=100%, # 1/0 AWG, 1x3c+SH
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, 350 kcmil, 1x1c+SH
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, # 4 AWG, 1x3c+SH
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, 350 kcmil, 1x1c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 1 AWG, 1x3c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 10 AWG, 1x3c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x3c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 2 AWG, 1x3c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 4 AWG, 1x3c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x3c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 8 AWG, 1x3c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x4c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 14 AWG, 1x5c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multi-triada, conductor de cobre, clase 300 V, aislamiento de PVC, # 18 AWG, 1x4T (+Pantalla por triada y total)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multi-triada, conductor de cobre, clase 300 V, aislamiento de PVC, # 18 AWG, 1x8T (+Pantalla por triada y total)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 10 AWG, 1x1c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 12 AWG, 1x1c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de cobre, clase 25 kV, apantallado, aislamiento de XLPE, IL=100%, # 1/0 AWG, 1x3c+SH
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, 350 kcmil, 1x1c+SH
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, # 4/0 AWG, 1x3c+T+SH
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, # 4 AWG, 1x3c+SH
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, 350 kcmil, 1x1c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 1 AWG, 1x3c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 8 AWG, 1x3c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 10 AWG, 1x3c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x3c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 14 AWG, 1x3c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 2 AWG, 1x3c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 4 AWG, 1x3c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x3c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 8 AWG, 1x3c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 10 AWG, 1x3c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 1 AWG, 1x4c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x4c+T
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 14 AWG, 1x5c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 16 AWG, 1x3c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 16 AWG, 1x5c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multi-triada, conductor de cobre, clase 300 V, aislamiento de PVC, # 18 AWG, 1x4T (+Pantalla por triada y total)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Multi-triada, conductor de cobre, clase 300 V, aislamiento de PVC, # 18 AWG, 1x8T (+Pantalla por triada y total)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable Profibus PA 1x1p;# 18 AWG, Tipo A
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable Profibus DP 1x1p;# 22 AWG Tipo A
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable Ethernet (UTP)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 12 AWG, 1x1c
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Tendido terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Monoconductor de fuerza, cobre, aislado, clase 600 V, #8 AWG
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Ground Rod 3/4"x3m (Supplied and installed by Contractor)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Conexionado Cable de Aterrizamiento 1x1c;8 AWG
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", con base horizontal, montado en poste recto ortogonal de acero galvan
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 1/0, 25 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 1/0, 25 KV, SHLD, SHRINKABLE, 100-133 % I.L., OUT
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - CABLE TERMINATION KIT, 1/C MCM 350, 5 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - CABLE TERMINATION KIT, 1/C AWG 4/0, 5 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 4, 5 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, SINGLE CONDUCTOR, 1/C MCM 350, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 1, XLPE/LSZH, BLACK JACKET
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 10, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 12, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 14, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 2, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 4, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 6, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 8, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 10, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 1, XLPE/LSZH, BLACK JACKET
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 6, XLPE/PVC, BLACK JACKET
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 5 x 14 AWG, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 3 X 16 AWG, XLPE/LSZH, BLACK
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI TRIAD, 4 x 18 AWG INDIVIDUAL & OVERALL SH
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI TRIAD, 8 x 18 AWG INDIVIDUAL & OVERALL SH
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE CONDUCTOR, 1/C AWG 10, HALOGEN FREE, RED
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Instalacion de mufas de terminacion y union y/o te 50% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado en Mine Pit Reclaim Water Storage Sub 20% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Estación de control local (Botonera), "Parada Emergencia / JOG", acero galvanizado, NEMA 4
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - THREE PHASE RECEPTACLE ASSEMBLY, 600 V, 63 AMP, 3 PH+G , 63 x 600 m
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - SINGLE PHASE RECEPTACLE ASSEMBLY, 600 V, 16 AMP, 1 PH+G , 16 x 600 m
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Proyector industrial LED, montaje en muro o columna, 531 W
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Equipo alumbrado público (1 unidad), LED, montaje en poste recto ortogonal de acero galvanizado de 9 m, 258 W
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 70% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - DISTRIBUTION TRANSFORMER, 500 kVA, 22900/480 V, Dyn1, KNAN, 65°C, SILICONE OIL IMMERSED (TAG No.: XX
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - DISTRIBUTION TRANSFORMER, 150 kVA, 480/400-231 V, Dyn1, KNAN, 65°C, SILICONE OIL IMMERSED (TAG No.: X
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G, 480 V, 20 kA
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G, 400-231 V, 14 kA
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G, 208-120 V, 10 kA
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 2P, 125 V (dc), 5 kA
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950
BREAKER, 630 A Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
XXX-XX)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950
BREAKER, 600 A Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
XXX-XX)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
REAKER, 1200 A
R, 400 A
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
REAKER, 1200 2950
A Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
R, 400 A
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - MOTOR CONTROL CENTER, 480 V, 1200 A, 65 kA
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - BATTERY CHARGER, 400 V-125 V (dc)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - BATTERY BANK, 125 V (dc)
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02
nstallation of Electrical Room
2950 Suministro de materiales en Mine Pit Reclaim Water 10% CONSTRUCTEXECUTION FRONT 02
2950 Montaje terminado en Mine Pit Reclaim Water Stora 60% CONSTRUCTEXECUTION FRONT 02
2950 Conexionado interior en Mine Pit Reclaim Water Sto 10% CONSTRUCTEXECUTION FRONT 02
2950 Protocolos de pruebas y recepcion finales en Mine 20% CONSTRUCTEXECUTION FRONT 02

ntaje / Ejecución - Transmisor Flujo Tipo Magnético


2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Actuador eléctrico con interruptores de posición
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Tablero de Alimentación para Instrumentación en Terreno
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
ntaje / Ejecución - Rack Remoto (IO Block Terreno)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 02
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 02
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 02
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 02
s (ERoom & Transformer)

ntaje / Ejecución - Excavación de Escarpe


2610 Excavación de escarpe e=0.30 cm 100% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Relleno Masivo Clase B
2610 Relleno Masivo Clase B en Platform Earthworks Min 100% CONSTRUCTEXECUTION FRONT 02
ntaje/Ejecución - Preparación de Subrasante
2610 Perfiladura, compactación y terminación de subrasa 100% CONSTRUCTEXECUTION FRONT 02

ra en Bill Quantity)
ounding system excavation
2610 Excavación para puesta a tierra 100% CONSTRUCTEXECUTION FRONT 03
ried Conduit excavation
2610 Excavación para conductos enterrados 100% CONSTRUCTEXECUTION FRONT 03
uct Bank excavation
2610 Excavación para bancoductos 100% CONSTRUCTEXECUTION FRONT 03
Manhole excavation
2610 Excavación para manholes 100% CONSTRUCTEXECUTION FRONT 03
ghting pole foundation excavation
2610 Excavación para fundación de pararrayo 100% CONSTRUCTEXECUTION FRONT 03
ounding system backfill and compaction
2610 Relleno para puesta a tierra 100% CONSTRUCTEXECUTION FRONT 03
ried conduit backfill and compaction
2610 Relleno para conductos enterrados 100% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Duct Bank backfill and compaction
2610 Relleno de bancoductos 100% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Manhole backfill and compaction
2610 Relleno y compactación para manholes 100% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Lighting pole foundation backfill and compaction
2610 Rellno y compactación para fundación de pararrayo 100% CONSTRUCTEXECUTION FRONT 03

ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”


2720 Suministro y Colocacion en Coarse Ore Handling Ele 50% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”
2720 Suministro y Colocacion en Coarse Ore Handling Ele 50% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2720 Suministro y Colocacion en Coarse Ore Handling Ele 50% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2720 Suministro y Colocacion en Coarse Ore Handling Ele 50% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2720 Suministro y Colocacion en Coarse Ore Handling Ele 50% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2720 Suministro y Colocacion en Coarse Ore Handling Ele 50% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2720 Suministro y Colocacion en Coarse Ore Handling Ele 50% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2720 Suministro y Colocacion en Coarse Ore Handling Ele 50% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ministro - Inserto estándar ASTM A36 Peso < 200 kg
2720 Suministro y Colocacion en Coarse Ore Handling Ele 50% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
2720 Suministro y Colocacion en Coarse Ore Handling Ele 50% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 01- Cimentación Aislada, vol <8m3
2720 Suministro en Coarse Ore Handling Electrical Room 30% CONSTRUCTEXECUTION FRONT 03
2720 Cortado en Coarse Ore Handling Electrical Room 15% CONSTRUCTEXECUTION FRONT 03
2720 Doblado en Coarse Ore Handling Electrical Room 15% CONSTRUCTEXECUTION FRONT 03
2720 Punch List Completado en Coarse Ore Handling Elec 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 02- Cimentación Continua
2720 Suministro en Coarse Ore Handling Electrical Room 30% CONSTRUCTEXECUTION FRONT 03
2720 Cortado en Coarse Ore Handling Electrical Room 15% CONSTRUCTEXECUTION FRONT 03
2720 Doblado en Coarse Ore Handling Electrical Room 15% CONSTRUCTEXECUTION FRONT 03
2720 Punch List Completado en Coarse Ore Handling Elec 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 05- Losa Cimentación e < 1m
2720 Suministro en Coarse Ore Handling Electrical Room 30% CONSTRUCTEXECUTION FRONT 03
2720 Cortado en Coarse Ore Handling Electrical Room 15% CONSTRUCTEXECUTION FRONT 03
2720 Doblado en Coarse Ore Handling Electrical Room 15% CONSTRUCTEXECUTION FRONT 03
2720 Punch List Completado en Coarse Ore Handling Elec 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 06- Losa Cimentación 1m <= e < 2m
2720 Suministro en Coarse Ore Handling Electrical Room 30% CONSTRUCTEXECUTION FRONT 03
2720 Cortado en Coarse Ore Handling Electrical Room 15% CONSTRUCTEXECUTION FRONT 03
2720 Doblado en Coarse Ore Handling Electrical Room 15% CONSTRUCTEXECUTION FRONT 03
2720 Punch List Completado en Coarse Ore Handling Elec 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 09- Pedestal Sección <= 1m2
2720 Suministro en Coarse Ore Handling Electrical Room 30% CONSTRUCTEXECUTION FRONT 03
2720 Cortado en Coarse Ore Handling Electrical Room 15% CONSTRUCTEXECUTION FRONT 03
2720 Doblado en Coarse Ore Handling Electrical Room 15% CONSTRUCTEXECUTION FRONT 03
2720 Punch List Completado en Coarse Ore Handling Elec 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 26- Muro e<= 0.4m
2720 Suministro en Coarse Ore Handling Electrical Room 30% CONSTRUCTEXECUTION FRONT 03
2720 Cortado en Coarse Ore Handling Electrical Room 15% CONSTRUCTEXECUTION FRONT 03
2720 Doblado en Coarse Ore Handling Electrical Room 15% CONSTRUCTEXECUTION FRONT 03
2720 Punch List Completado en Coarse Ore Handling Elec 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 64- Banco de Ductos Reforzado
2720 Suministro en Coarse Ore Handling Electrical Room 30% CONSTRUCTEXECUTION FRONT 03
2720 Cortado en Coarse Ore Handling Electrical Room 15% CONSTRUCTEXECUTION FRONT 03
2720 Doblado en Coarse Ore Handling Electrical Room 15% CONSTRUCTEXECUTION FRONT 03
2720 Punch List Completado en Coarse Ore Handling Elec 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 69- Cámara
2720 Suministro en Coarse Ore Handling Electrical Room 30% CONSTRUCTEXECUTION FRONT 03
2720 Cortado en Coarse Ore Handling Electrical Room 15% CONSTRUCTEXECUTION FRONT 03
2720 Doblado en Coarse Ore Handling Electrical Room 15% CONSTRUCTEXECUTION FRONT 03
2720 Punch List Completado en Coarse Ore Handling Elec 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 69- Cámara - Concreto f´c =210 kg/cm2
2720 Colocacion de Acero de Refuerzo en Coarse Ore Hand 10% CONSTRUCTEXECUTION FRONT 03
2720 Colocacion de Encofrado en Coarse Ore Handling Ele 20% CONSTRUCTEXECUTION FRONT 03
2720 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 03
2720 Vaciado de Concreto en Coarse Ore Handling Electr 35% CONSTRUCTEXECUTION FRONT 03
2720 Descimbre en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 5% CONSTRUCTEXECUTION FRONT 03
2720 Punch List Completado en Coarse Ore Handling Elec 10% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 01- Cimentación Aislada, vol <8m3 - Concreto f´c =280 kg/cm2
2720 Colocacion de Acero de Refuerzo en Coarse Ore Hand 10% CONSTRUCTEXECUTION FRONT 03
2720 Colocacion de Encofrado en Coarse Ore Handling Ele 20% CONSTRUCTEXECUTION FRONT 03
2720 Vaciado de Concreto en Coarse Ore Handling Electr 45% CONSTRUCTEXECUTION FRONT 03
2720 Descimbre en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 5% CONSTRUCTEXECUTION FRONT 03
2720 Punch List Completado en Coarse Ore Handling Elec 10% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 02- Cimentación Continua - Concreto f´c =280 kg/cm2
2720 Colocacion de Acero de Refuerzo en Coarse Ore Hand 10% CONSTRUCTEXECUTION FRONT 03
2720 Colocacion de Encofrado en Coarse Ore Handling Ele 20% CONSTRUCTEXECUTION FRONT 03
2720 Vaciado de Concreto en Coarse Ore Handling Electr 45% CONSTRUCTEXECUTION FRONT 03
2720 Descimbre en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 5% CONSTRUCTEXECUTION FRONT 03
2720 Punch List Completado en Coarse Ore Handling Elec 10% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 05- Losa Cimentación e < 1m - Concreto f´c =280 kg/cm2
2720 Colocacion de Acero de Refuerzo en Coarse Ore Hand 10% CONSTRUCTEXECUTION FRONT 03
2720 Colocacion de Encofrado en Coarse Ore Handling Ele 20% CONSTRUCTEXECUTION FRONT 03
2720 Vaciado de Concreto en Coarse Ore Handling Electr 45% CONSTRUCTEXECUTION FRONT 03
2720 Descimbre en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 5% CONSTRUCTEXECUTION FRONT 03
2720 Punch List Completado en Coarse Ore Handling Elec 10% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 06- Losa Cimentación 1m <= e < 2m - Concreto f´c =280 kg/cm2
2720 Colocacion de Acero de Refuerzo en Coarse Ore Hand 10% CONSTRUCTEXECUTION FRONT 03
2720 Colocacion de Encofrado en Coarse Ore Handling Ele 20% CONSTRUCTEXECUTION FRONT 03
2720 Vaciado de Concreto en Coarse Ore Handling Electr 45% CONSTRUCTEXECUTION FRONT 03
2720 Descimbre en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 5% CONSTRUCTEXECUTION FRONT 03
2720 Punch List Completado en Coarse Ore Handling Elec 10% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 09- Pedestal Sección <= 1m2 - Concreto f´c =280 kg/cm2
2720 Colocacion de Acero de Refuerzo en Coarse Ore Hand 10% CONSTRUCTEXECUTION FRONT 03
2720 Colocacion de Encofrado en Coarse Ore Handling Ele 20% CONSTRUCTEXECUTION FRONT 03
2720 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 03
2720 Vaciado de Concreto en Coarse Ore Handling Electr 35% CONSTRUCTEXECUTION FRONT 03
2720 Descimbre en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 5% CONSTRUCTEXECUTION FRONT 03
2720 Punch List Completado en Coarse Ore Handling Elec 10% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 26- Muro e<= 0.4m - Concreto f´c =280 kg/cm2
2720 Colocacion de Acero de Refuerzo en Coarse Ore Hand 10% CONSTRUCTEXECUTION FRONT 03
2720 Colocacion de Encofrado en Coarse Ore Handling Ele 20% CONSTRUCTEXECUTION FRONT 03
2720 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 03
2720 Vaciado de Concreto en Coarse Ore Handling Electr 35% CONSTRUCTEXECUTION FRONT 03
2720 Descimbre en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 5% CONSTRUCTEXECUTION FRONT 03
2720 Punch List Completado en Coarse Ore Handling Elec 10% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 64- Banco de Ductos Reforzado - Concreto f´c =150 kg/cm2
2720 Colocacion de Acero de Refuerzo en Coarse Ore Hand 10% CONSTRUCTEXECUTION FRONT 03
2720 Colocacion de Encofrado en Coarse Ore Handling Ele 20% CONSTRUCTEXECUTION FRONT 03
2720 Colocacion Ductos en Coarse Ore Handling Electrica 15% CONSTRUCTEXECUTION FRONT 03
2720 Vaciado de Concreto en Coarse Ore Handling Electr 30% CONSTRUCTEXECUTION FRONT 03
2720 Descimbre en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 5% CONSTRUCTEXECUTION FRONT 03
2720 Punch List Completado en Coarse Ore Handling Elec 10% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 69- Base de poste de iluminacion - Concreto f´c =210 kg/cm2
2720 Colocacion de Acero de Refuerzo en Coarse Ore Hand 10% CONSTRUCTEXECUTION FRONT 03
2720 Colocacion de Encofrado en Coarse Ore Handling Ele 20% CONSTRUCTEXECUTION FRONT 03
2720 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 03
2720 Vaciado de Concreto en Coarse Ore Handling Electr 35% CONSTRUCTEXECUTION FRONT 03
2720 Descimbre en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 5% CONSTRUCTEXECUTION FRONT 03
2720 Punch List Completado en Coarse Ore Handling Elec 10% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 61- Solado - Concreto f´c =100 kg/cm2
2720 Colocacion de Encofrado en Coarse Ore Handling Ele 25% CONSTRUCTEXECUTION FRONT 03
2720 Vaciado de Concreto en Coarse Ore Handling Electr 30% CONSTRUCTEXECUTION FRONT 03
2720 Descimbre en Coarse Ore Handling Electrical Room 25% CONSTRUCTEXECUTION FRONT 03
2720 Limpieza en Coarse Ore Handling Electrical Room 10% CONSTRUCTEXECUTION FRONT 03
2720 Punch List Completado en Coarse Ore Handling Elec 10% CONSTRUCTEXECUTION FRONT 03

ntaje / Ejecución - Escalerilla portaconductores, acero galvanizado en caliente, 600x100 mm


2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Escalerilla portaconductores, acero galvanizado en caliente, 300x100 mm
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Escalerilla portaconductores, acero galvanizado en caliente, 150x100 mm
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 3/4"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 1"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 1 1/2"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 2"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 3"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 4"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Conduit a la vista, PVC Schedule 80 resistente a la radiación UV, diámetro 1 1/2"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Conduit directamente enterrado, acero galvanizado en caliente ANSI C80.1, diámetro 1"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Conduit en banco de ductos, PVC Schedule 40, diámetro 4"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Conduit en banco de ductos, PVC Schedule 40, diámetro 4"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 10 AWG, 1x1c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Monoconductor de cobre, clase 25 kV, apantallado, aislamiento de XLPE, IL=100%, 500 kcmil, 1x1c+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Monoconductor de cobre, clase 25 kV, apantallado, aislamiento de XLPE, IL=100%, 350 kcmil, 1x1c+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Monoconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, 350 kcmil, 1x1c+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Monoconductor de cobre, clase 5 kV, apantallado, aislamiento de XLPE, IL=100%, # 4/0 AWG, 1x3c+T+SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Monoconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, 500 kcmil, 1x1c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Monoconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, 350 kcmil, 1x1c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 2/0 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 10 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 14 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 2 AWG, 1x3c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 4 AWG, 1x3c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x3c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 8 AWG, 1x3c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x3c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x4c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x4c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x4c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x4c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 6 AWG, 1x4c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 10 AWG, 1x4c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x4c+T
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x5c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 14 AWG, 1x5c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 14 AWG, 1x5c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 14 AWG, 1x5c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 16 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 16 AWG, 1x5c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Par apantallado, conductor de cobre, Clase 300 V, aislamiento de PVC, # 16 AWG, 1x1P (+Pantalla)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Cable de Instrumentación 1x1t;# 18 AWG apantallado
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multi-triada, conductor de cobre, clase 300 V, aislamiento de PVC, # 18 AWG, 1x4T (+Pantalla por triada y total)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multi-triada, conductor de cobre, clase 300 V, aislamiento de PVC, # 18 AWG, 1x8T (+Pantalla por triada y total)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Cable Profibus PA 1x1p;# 18 AWG, Tipo A
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Cable Profibus DP 1x1p;# 22 AWG Tipo A
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Cable Ethernet (UTP)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 12 AWG, 1x1c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 12 AWG, 1x1c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Monoconductor de fuerza, cobre, aislado, clase 600 V, #8 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Ground Bar In Man Holes (Supplied and installed by Contractor)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Ground Rod 3/4"x3m (Supplied and installed by Contractor)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Conexionado Cable de Aterrizamiento 1x1c;8 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", con base horizontal, montado en poste recto ortogonal de acero galvan
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 03
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 03
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - CABLE TERMINATION KIT, 1/C MCM 350, 25 KV, SHLD, SHRINKABLE, 100-133 % I.L., OUT
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - CABLE TERMINATION KIT, 1/C MCM 350, 25 KV, SHLD, SHRINKABLE, 100-133 % I.L., OUT
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - CABLE TERMINATION KIT, 3/C AWG 2/0, 25 KV, SHLD, 100-133 % I.L., INDOOR
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - CABLE TERMINATION KIT, 1/C MCM 350, 5 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - CABLE TERMINATION KIT, 1/C AWG 4/0, 5 KV, SHLD, SHRINKABLE, 100-133 % I.L., IN
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, SINGLE CONDUCTOR, 1/C MCM 500, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, SINGLE CONDUCTOR, 1/C MCM 250, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 2/0, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 10, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 12, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 14, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 2, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 4, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 6, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 8, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C+G AWG 12, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 6, XLPE/PVC, BLACK JACKET
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 6, XLPE/PVC, BLACK JACKET
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 6, XLPE/PVC, BLACK JACKET
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 6, XLPE/PVC, BLACK JACKET
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 6, XLPE/PVC, BLACK JACKET
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 10, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 12, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERMINATION OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 5/C AWG 12,XLPE/LSZH, BLACK JACKET
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 5 x 14 AWG, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 5 x 14 AWG, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 5 x 14 AWG, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 3 X 16 AWG, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI TRIAD, 4 x 18 AWG INDIVIDUAL & OVERALL SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF CONTROL CABLE, 300 V, MULTI TRIAD, 8 x 18 AWG INDIVIDUAL & OVERALL SH
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE CONDUCTOR, 1/C AWG 12, HALOGEN FREE, RED
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF LIGHTING CABLE, 600 V, SINGLE CONDUCTOR, 1/C AWG 12, HALOGEN FREE, RED
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Estación de control local (Botonera), "Parada Emergencia / JOG", acero galvanizado, NEMA 4
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - THREE PHASE RECEPTACLE ASSEMBLY, 600 V, 63 AMP, 3 PH+G , 63 x 600 m
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - SINGLE PHASE RECEPTACLE ASSEMBLY, 600 V, 16 AMP, 1 PH+G , 16 x 600 m
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Luminaria industrial LED, montaje en muro o columna, 113 W
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Equipo alumbrado público (1 unidad), LED, montaje en poste recto ortogonal de acero galvanizado de 9 m, 159 W
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Equipo de alumbrado de emergencia, montaje en muro o columna, 2x50 W
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - DISTRIBUTION TRANSFORMER, 250 kVA , 480/400-231 V, Dyn1, KNAN, 65°C, SILICONE OIL IMMERSED (TAG No.: X
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - DISTRIBUTION TRANSFORMER, 250 kVA , 480/400-231 V, Dyn1, KNAN, 65°C, SILICONE OIL IMMERSED (TAG No.: X
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - DISTRIBUTION TRANSFORMER, 250 kVA , 480/400-231 V, Dyn1, KNAN, 65°C, SILICONE OIL IMMERSED (TAG No.: X
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G, 400-231 V, 14 kA
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 3P+N+G, 208-120 V, 10 kA
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - DISTRIBUTION PANEL, NEMA 12, 2P, 125 V (dc), 5 kA
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 03
BREAKER, 630 2630
A Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
XXX-XX)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 03
AKER, 1200 A2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
R, 400 A
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - MOTOR CONTROL CENTER, 480 V, 1200 A, 65 kA
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - VARIABLE FREQUENCY DRIVE, 3550 kW, 4160 V
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - BATTERY CHARGER, 400 V-125 V (dc)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - BATTERY BANK, 125 V (dc)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos
ntaje / Ejecución de pruebas
- BUSBAR DUCT, 480 V,y 3200
recepcion
A, 65finales
kA en Primar 20% CONSTRUCTEXECUTION FRONT 03
XXX)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 60% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado interior en Primary Crusher Electrical 10% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03

2630 Instalación de sala eléctrica 100% CONSTRUCTEXECUTION FRONT 03

2630 nstallation of Harmonic equipment 100% CONSTRUCTEXECUTION FRONT 03


To Stockpile (Compartido con Frente 02)

tra en Bill Quantity)

ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”


2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 03
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 03
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 03
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro ≥ ¾” y ≤ 1” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 03
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 03
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 03
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 03
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 03
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 03
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 03
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2 1/2”
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 03
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2 1/2” con camisa
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 03
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ministro - Inserto estándar ASTM A36 Peso < 200 kg
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 03
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
2730 Suministro y Colocacion en Overland Conveyor Belt 50% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 03
2730 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 05- Losa Cimentación e < 1m
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 03
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 03
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 06- Losa Cimentación 1m <= e < 2m
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 03
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 03
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 09- Pedestal Sección <= 1m2
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 03
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 03
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 10- Pedestal Sección > 1m2
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 03
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 03
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 11- Durmiente
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 03
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 03
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 27- Muro 0.4m < e <= 1m
2730 Suministro en Overland Conveyor Belt To Ore Stockp 30% CONSTRUCTEXECUTION FRONT 03
2730 Cortado en Overland Conveyor Belt To Ore Stockpile 15% CONSTRUCTEXECUTION FRONT 03
2730 Doblado en Overland Conveyor Belt To Ore Stockpil 15% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 05- Losa Cimentación e < 1m - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 03
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 03
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 03
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 03
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 06- Losa Cimentación 1m <= e < 2m - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 03
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 03
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 03
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 03
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 09- Pedestal Sección <= 1m2 - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 03
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 03
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 03
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 03
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 10- Pedestal Sección > 1m2 - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 03
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 03
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 03
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 03
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 11- Durmiente - Concreto f´c =280 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 03
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 03
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 03
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 03
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 27- Muro 0.4m < e <= 1m - Concreto f´c =350 kg/cm2
2730 Colocacion de Acero de Refuerzo en Overland Convey 10% CONSTRUCTEXECUTION FRONT 03
2730 Colocacion de Encofrado en Overland Conveyor Belt 20% CONSTRUCTEXECUTION FRONT 03
2730 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 03
2730 Vaciado de Concreto en Overland Conveyor Belt To O 35% CONSTRUCTEXECUTION FRONT 03
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 10% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 5% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 61- Solado - Concreto f´c =100 kg/cm2
2730 Colocacion de Encofrado en Overland Conveyor Belt 25% CONSTRUCTEXECUTION FRONT 03
2730 Vaciado de Concreto en Overland Conveyor Belt To O 30% CONSTRUCTEXECUTION FRONT 03
2730 Descimbre en Overland Conveyor Belt To Ore Stockp 25% CONSTRUCTEXECUTION FRONT 03
2730 Limpieza en Overland Conveyor Belt To Ore Stockpil 10% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 03

ntaje / Ejecución - Acero Estructural Liviano (<= 30 kg/m)


2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Acero Estructural Mediano (> 30 kg/m y <= 60 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Acero Estructural Pesado (> 60 kg/m y <= 90 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Acero Estructural Extra Pesado (> 90 kg/m y <= 150 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Acero Estructural Doble Extra Pesado (> 150 kg/m <= 300 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Acero Estructural Triple Extra Pesado (> 300 kg/m y <= 642 kg/m)
2730 Pre-armado en Overland Conveyor Belt To Ore Stock 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje y Conexion en Overland Conveyor Belt To O 60% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 30% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Rejilla de Piso - Acero Carbono 32mm x 5mm
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Baranda de acero con Guardapies
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Estructura Ensamblada Liviana (<= 30 kg/m)
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Estructura Ensamblada Mediana (> 30 kg/m y <= 60 kgf/m)
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Estructura Ensamblada Pesada (> 60 kg/m y <= 90 kgf/m)
2730 Montaje y Conexion en Overland Conveyor Belt To O 80% CONSTRUCTEXECUTION FRONT 03
2730 Punch List Completado en Overland Conveyor Belt T 20% CONSTRUCTEXECUTION FRONT 03

ntaje / Ejecución - Revestimiento de Techo Plancha sin Aislación


2730 Armado y Montaje en Overland Conveyor Belt To Ore 70% CONSTRUCTEXECUTION FRONT 03
2730 Fijaciones en Overland Conveyor Belt To Ore Stockpi 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolos de Entregas en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Revestimiento Lateral Plancha sin Aislación
2730 Armado y Montaje en Overland Conveyor Belt To Ore 70% CONSTRUCTEXECUTION FRONT 03
2730 Fijaciones en Overland Conveyor Belt To Ore Stockpi 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolos de Entregas en Overland Conveyor Belt T 10% CONSTRUCTEXECUTION FRONT 03

ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VENTILATION FAN #1 WITH SILENCERS, 120000 Am3/h, 490 Pa
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Ventilador en Overland Conveyor Belt To Or 40% CONSTRUCTEXECUTION FRONT 03
2730 Montaje ducteria y soportacion en Overland Conveyo 20% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VENTILATION FAN #2 WITH SILENCERS, 120000 Am3/h, 490 Pa
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Ventilador en Overland Conveyor Belt To Or 40% CONSTRUCTEXECUTION FRONT 03
2730 Montaje ducteria y soportacion en Overland Conveyo 20% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - OVERLAND CONVEYOR TUNNEL AXIAL VENTILATION FAN #3 WITH SILENCERS, 120000 Am3/h, 490 Pa
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Ventilador en Overland Conveyor Belt To Or 40% CONSTRUCTEXECUTION FRONT 03
2730 Montaje ducteria y soportacion en Overland Conveyo 20% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - BOMBA BOOSTER AGUA FRESCA SISTEMA SUPRESION DE POLVO ; 9,5 M3/H ; 100KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Bomba en Overland Conveyor Belt To Ore S 60% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - MOTOR ELECTRICO BOMBA BOOSTER AGUA FRESCA SISTEMA SUPRESION DE POLVO ; 3 kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Bomba en Overland Conveyor Belt To Ore S 60% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - CHUTE DESCARGA FAJA OVERLAND ; 12000KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Bomba en Overland Conveyor Belt To Ore S 60% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - CHUTE ALIMENTACION FAJA OVERLAND ; 8470KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Bomba en Overland Conveyor Belt To Ore S 60% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - SISTEMA SUPRESOR DE POLVO DESCARGA FAJA DE SACRIFICIO ; 3 kW ; 300KG SACRIFICE CONVEYOR DISCHARGE
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos Supresores de Polvo en Overland 60% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESOR DE POLVO SACRIFICE CONVEYOR DISCHARGE DUST SUPPRESSOR SY
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos Supresores de Polvo en Overland 60% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - SISTEMA SUPRESOR DE POLVO 3, DESCARGA FAJA OVERLAND ; 3 kW ; 500KG OVERLAND CONVEYOR DISCHARGE
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos Supresores de Polvo en Overland 60% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - CAJA DE DISTRIBUCIÓN SISTEMA SUPRESOR DE POLVO OVERLAND CONVEYOR DISCHARGE DUST SUPPRESSOR S
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos Supresores de Polvo en Overland 60% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - CINTA FAJA TRANSPORTADORA OVERLAND ; FLUJO HUMEDO 10897 TPH, 2,5 % HUMEDAD ; 4711x1,829x195m
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-GALERIES
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Bomba en Overland Conveyor Belt To Ore S 60% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - Galerías
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - Item 3: Galería Stacker
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - Item 5: Galería Inc 5000 kg Chute/sin Pulley
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-IMPACT TABLE
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-LOAD TABLE
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-HEAD FRAME ASSEMBLY
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-TAIL FRAME SYSTEM
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-TAKE-UP ASSEMBLY
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - OVERLAND CONVEYOR 2730-CV-002-COUNTERWEIGHT ASSEMBLY
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - MOTOR ELECTRICO GEARLESS 1 FAJA OVERLAND ; 5500kW ; 80000KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - MOTOR ELECTRICO GEARLESS 2 FAJA OVERLAND ; 5500kW ; 80000KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - BALANZA FAJA OVERLAND ; 0,5kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - WINCHE DE MANTENIENTO DE CONTRAPESO FAJA OVERLAND
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - WINCHE MANTENIMIENTO POLEA DE CABEZA FAJA OVERLAND ; 10kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - FRENO HIDRAULICO POLEA MOTRIZ 1 FAJA OVERLAND
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - MOTOR DE BOMBA FRENO HIDRAULICO POLEA MOTRIZ 1 FAJA OVERLAND ; 3kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - FRENO HIDRAULICO POLEA MOTRIZ 2 FAJA OVERLAND
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - MOTOR DE BOMBA FRENO HIDRAULICO POLEA MOTRIZ 2 FAJA OVERLAND ; 3kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - FRENO CABRESTANTE PARA FAJA TRANSPORTADORA OVERLAND ; 2,6x1,4x1,4m
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - MOTOR BOMBA FRENO CABRESTANTE PARA FAJA TRANSPORTADORA OVERLAND ; 2kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - MOTOR BOMBA 1 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 37kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - MOTOR BOMBA 2 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 37kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - UNIDAD DE ENFRIAMIENTO 1 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 36kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - UNIDAD DE ENFRIAMIENTO 2 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 36kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - UNIDAD DE ENFRIAMIENTO 2 SISTEMA DE ENFRIAMIENTO MOTORES FAJA OVERLAND ; 36kW
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - OVERLAND CONVEYOR MOTOR WATER COOLING SYSTEM CONTROL PANEL
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
taje / Ejecución - OVERLAND CONVEYOR IDLER GUARDING
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos estructurales en Overland Convey 20% CONSTRUCTEXECUTION FRONT 03
2730 Montaje elementos mecanicos 30% CONSTRUCTEXECUTION FRONT 03
2730 Montaje Chutes de Polvo en Overland Conveyor Belt 10% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - POLIPASTO ELECTRICO MANTENCION FAJAS ALIMENTADORAS ; 25 T ; 1,2x2,05x1,1m ; 10 kW ; 1300KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje En sitio de poliplastos 60% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - POLIPASTO ELECTRICO POLEA CABEZA FAJA OVERLAND ; 20 T ; 1,2x2,05x1,1m ; 10 kW ; 1300KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje En sitio de poliplastos 60% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - POLIPASTO ELECTRICO MANTENCION FAJAS ALIMENTADORAS ; 25 T ; 1,2x2,05x1,1m ; 10 kW ; 1300KG
2730 Recepcion y traslado de elementos a obra en Overla 10% CONSTRUCTEXECUTION FRONT 03
2730 Montaje En sitio de poliplastos 60% CONSTRUCTEXECUTION FRONT 03
2730 Conexionado (*), Pruebas e Inspeccion en Overland 20% CONSTRUCTEXECUTION FRONT 03
2730 Protocolo Entrega de Equipos en Overland Conveyor 10% CONSTRUCTEXECUTION FRONT 03

ntaje / Ejecución - Pesómetro de Faja


2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Indicador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Interruptor de Flujo Tipo Térmico
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Indicadores de Presión sin/con Sello
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Indicador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Interruptores de Presión sin/con Sello
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Sensor Temperatura
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Sensor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Transmisor de Temperatura
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Sirena (Horn)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Sirena en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Baliza (Beacon)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Baliza en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Interruptor de Desalineamiento Faja
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Interruptor de Seguridad tipo Pull Cord
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Interruptor de Corte de Faja Mecánico
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Sensor/Transmisor de Velocidad
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Sistema de Detección de Ruptura de Fajas Electrónico
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Sensor/Transmisor de Vibración
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Interruptor posición contrapeso fajas
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Interruptor posición carro repartidor
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Sensor transmision de posicion
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Sensor/Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Interruptor de posición cerrado / abierto
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Tipo de radar de interruptor de nivel
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Panel Paquete Mecánico Tipo # 1 (Hasta 40 kg)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Panel Paquete Mecánico Tipo # 2 (Entre 41 kg y 80 kg)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ministro / Instalación - Suministro e Instalación Placa de Montaje Tipo 3
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Caja de Terreno MONITOREO DE CONDICIONES
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Rack Remoto (IO Block Terreno)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Cámaras CCTV OUTDOOR
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Gabinete CCTV Outdoor (Power & Signal)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03

ntaje / Ejecución - Acero Estructural Liviano (<= 30 kg/m)


2840 Pre-armado en Diesel Storage Discharge Area 10% CONSTRUCTEXECUTION FRONT 03
2840 Montaje y Conexion en Diesel Storage Discharge Ar 60% CONSTRUCTEXECUTION FRONT 03
2840 Punch List Completado en Diesel Storage Discharge 30% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Acero Estructural Mediano (> 30 kg/m y <= 60 kg/m)
2840 Pre-armado en Diesel Storage Discharge Area 10% CONSTRUCTEXECUTION FRONT 03
2840 Montaje y Conexion en Diesel Storage Discharge Ar 60% CONSTRUCTEXECUTION FRONT 03
2840 Punch List Completado en Diesel Storage Discharge 30% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Acero Estructural Pesado (> 60 kg/m y <= 90 kg/m)
2840 Pre-armado en Diesel Storage Discharge Area 10% CONSTRUCTEXECUTION FRONT 03
2840 Montaje y Conexion en Diesel Storage Discharge Ar 60% CONSTRUCTEXECUTION FRONT 03
2840 Punch List Completado en Diesel Storage Discharge 30% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Rejilla de Piso - Acero Carbono 32mm x 5mm
2840 Montaje y Conexion en Diesel Storage Discharge Ar 80% CONSTRUCTEXECUTION FRONT 03
2840 Punch List Completado en Diesel Storage Discharge 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Escalera Ensamblada, incluye largueros, descansos y baranda
2840 Montaje y Conexion en Diesel Storage Discharge Ar 80% CONSTRUCTEXECUTION FRONT 03
2840 Punch List Completado en Diesel Storage Discharge 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Estructura Ensamblada Liviana (<= 30 kg/m)
2840 Montaje y Conexion en Diesel Storage Discharge Ar 80% CONSTRUCTEXECUTION FRONT 03
2840 Punch List Completado en Diesel Storage Discharge 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Estructura Ensamblada Mediana (> 30 kg/m y <= 60 kgf/m)
2840 Montaje y Conexion en Diesel Storage Discharge Ar 80% CONSTRUCTEXECUTION FRONT 03
2840 Punch List Completado en Diesel Storage Discharge 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Estructura Ensamblada Pesada (> 60 kg/m y <= 90 kgf/m)
2840 Montaje y Conexion en Diesel Storage Discharge Ar 80% CONSTRUCTEXECUTION FRONT 03
2840 Punch List Completado en Diesel Storage Discharge 20% CONSTRUCTEXECUTION FRONT 03

ounding system excavation


2610 Excavación para puesta a tierra 100% CONSTRUCTEXECUTION FRONT 03
ried Conduit excavation
2610 Excavación para conductos enterrados 100% CONSTRUCTEXECUTION FRONT 03
uct Bank excavation
2610 Excavación para bancoductos 100% CONSTRUCTEXECUTION FRONT 03
Manhole excavation
2610 Excavación para manholes 100% CONSTRUCTEXECUTION FRONT 03
ghting pole foundation excavation
2610 Excavación para fundación de pararrayo 100% CONSTRUCTEXECUTION FRONT 03
ounding system backfill and compaction
2610 Relleno para puesta a tierra 100% CONSTRUCTEXECUTION FRONT 03
ried conduit backfill and compaction
2610 Relleno para conductos enterrados 100% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Duct Bank backfill and compaction
2610 Relleno de bancoductos 100% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Manhole backfill and compaction
2610 Relleno y compactación para manholes 100% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Lighting pole foundation backfill and compaction
2610 Rellno y compactación para fundación de pararrayo 100% CONSTRUCTEXECUTION FRONT 03

ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”


2840 Suministro y Colocacion en Diesel Storage Discharge 50% CONSTRUCTEXECUTION FRONT 03
2840 Limpieza en Diesel Storage Discharge Area 10% CONSTRUCTEXECUTION FRONT 03
2840 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½”
2840 Suministro y Colocacion en Diesel Storage Discharge 50% CONSTRUCTEXECUTION FRONT 03
2840 Limpieza en Diesel Storage Discharge Area 10% CONSTRUCTEXECUTION FRONT 03
2840 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ministro - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2840 Suministro y Colocacion en Diesel Storage Discharge 50% CONSTRUCTEXECUTION FRONT 03
2840 Limpieza en Diesel Storage Discharge Area 10% CONSTRUCTEXECUTION FRONT 03
2840 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro < 1” y ≤ 1 ½” con camisa
2840 Suministro y Colocacion en Diesel Storage Discharge 50% CONSTRUCTEXECUTION FRONT 03
2840 Limpieza en Diesel Storage Discharge Area 10% CONSTRUCTEXECUTION FRONT 03
2840 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2”
2840 Suministro y Colocacion en Diesel Storage Discharge 50% CONSTRUCTEXECUTION FRONT 03
2840 Limpieza en Diesel Storage Discharge Area 10% CONSTRUCTEXECUTION FRONT 03
2840 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Perno de anclaje estándar ASTM F1554 Gr36 Diámetro 2” con camisa
2840 Suministro y Colocacion en Diesel Storage Discharge 50% CONSTRUCTEXECUTION FRONT 03
2840 Limpieza en Diesel Storage Discharge Area 10% CONSTRUCTEXECUTION FRONT 03
2840 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ministro - Inserto estándar ASTM A36 Peso < 200 kg
2840 Suministro y Colocacion en Diesel Storage Discharge 50% CONSTRUCTEXECUTION FRONT 03
2840 Limpieza en Diesel Storage Discharge Area 10% CONSTRUCTEXECUTION FRONT 03
2840 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ntaje/Ejecución - Inserto estándar ASTM A36 Peso < 200 kg
2840 Suministro y Colocacion en Diesel Storage Discharge 50% CONSTRUCTEXECUTION FRONT 03
2840 Limpieza en Diesel Storage Discharge Area 10% CONSTRUCTEXECUTION FRONT 03
2840 Recepcion de Protocolo Topografico sin observacion 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 08- Anillo de Cimentación
2840 Suministro en Diesel Storage Discharge Area 30% CONSTRUCTEXECUTION FRONT 03
2840 Cortado en Diesel Storage Discharge Area 15% CONSTRUCTEXECUTION FRONT 03
2840 Doblado en Diesel Storage Discharge Area 15% CONSTRUCTEXECUTION FRONT 03
2840 Punch List Completado en Diesel Storage Discharge 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Refuerzo de Concreto ASTM A615 Gr60 - Tipo 69- Cámara
2840 Suministro en Diesel Storage Discharge Area 30% CONSTRUCTEXECUTION FRONT 03
2840 Cortado en Diesel Storage Discharge Area 15% CONSTRUCTEXECUTION FRONT 03
2840 Doblado en Diesel Storage Discharge Area 15% CONSTRUCTEXECUTION FRONT 03
2840 Punch List Completado en Diesel Storage Discharge 40% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 08- Anillo de Cimentación - Concreto f´c =280 kg/cm2
2840 Colocacion de Acero de Refuerzo en Diesel Storage 10% CONSTRUCTEXECUTION FRONT 03
2840 Colocacion de Encofrado en Diesel Storage Discharg 20% CONSTRUCTEXECUTION FRONT 03
2840 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 03
2840 Vaciado de Concreto en Diesel Storage Discharge Ar 35% CONSTRUCTEXECUTION FRONT 03
2840 Descimbre en Diesel Storage Discharge Area 10% CONSTRUCTEXECUTION FRONT 03
2840 Limpieza en Diesel Storage Discharge Area 5% CONSTRUCTEXECUTION FRONT 03
2840 Punch List Completado en Diesel Storage Discharge 10% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 64- Banco de Ductos Reforzado - Concreto f´c =150 kg/cm2
2840 Colocacion de Acero de Refuerzo en Diesel Storage 10% CONSTRUCTEXECUTION FRONT 03
2840 Colocacion de Encofrado en Diesel Storage Discharg 20% CONSTRUCTEXECUTION FRONT 03
2840 Colocacion Ductos en Diesel Storage Discharge Area 15% CONSTRUCTEXECUTION FRONT 03
2840 Vaciado de Concreto en Diesel Storage Discharge Ar 30% CONSTRUCTEXECUTION FRONT 03
2840 Descimbre en Diesel Storage Discharge Area 10% CONSTRUCTEXECUTION FRONT 03
2840 Limpieza en Diesel Storage Discharge Area 5% CONSTRUCTEXECUTION FRONT 03
2840 Punch List Completado en Diesel Storage Discharge 10% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 69- Base de poste de iluminacion - Concreto f´c =210 kg/cm2
2840 Colocacion de Acero de Refuerzo en Diesel Storage 10% CONSTRUCTEXECUTION FRONT 03
2840 Colocacion de Encofrado en Diesel Storage Discharg 20% CONSTRUCTEXECUTION FRONT 03
2840 Colocacion Topografica de Insertos Estandar y Perno 10% CONSTRUCTEXECUTION FRONT 03
2840 Vaciado de Concreto en Diesel Storage Discharge Ar 35% CONSTRUCTEXECUTION FRONT 03
2840 Descimbre en Diesel Storage Discharge Area 10% CONSTRUCTEXECUTION FRONT 03
2840 Limpieza en Diesel Storage Discharge Area 5% CONSTRUCTEXECUTION FRONT 03
2840 Punch List Completado en Diesel Storage Discharge 10% CONSTRUCTEXECUTION FRONT 03
ministro e Instalación/Ejecución - Concreto vaciado en obra - Tipo 61- Solado - Concreto f´c =100 kg/cm2
2840 Colocacion de Encofrado en Diesel Storage Discharg 25% CONSTRUCTEXECUTION FRONT 03
2840 Vaciado de Concreto en Diesel Storage Discharge Ar 30% CONSTRUCTEXECUTION FRONT 03
2840 Descimbre en Diesel Storage Discharge Area 25% CONSTRUCTEXECUTION FRONT 03
2840 Limpieza en Diesel Storage Discharge Area 10% CONSTRUCTEXECUTION FRONT 03
2840 Punch List Completado en Diesel Storage Discharge 10% CONSTRUCTEXECUTION FRONT 03

ntaje / Ejecución - Acero Estructural Liviano (<= 30 kg/m)


2840 Pre-armado en Diesel Storage Discharge Area 10% CONSTRUCTEXECUTION FRONT 03
2840 Montaje y Conexion en Diesel Storage Discharge Ar 60% CONSTRUCTEXECUTION FRONT 03
2840 Punch List Completado en Diesel Storage Discharge 30% CONSTRUCTEXECUTION FRONT 03
ng Diesel Tanks) (Se muestra en CWP contrato K170 pero no en BOQ)
ntaje / Ejecución - BOMBA DESCARGA DIESEL MINA; 60 M3/H @ 16,7MCF ; 150KG
2840 Recepcion y traslado de elementos a obra en Diesel 10% CONSTRUCTEXECUTION FRONT 03
2840 Montaje Bomba en Diesel Storage Discharge Area 60% CONSTRUCTEXECUTION FRONT 03
2840 Conexionado (*), Pruebas e Inspeccion en Diesel St 20% CONSTRUCTEXECUTION FRONT 03
2840 Protocolo Entrega de Equipos en Diesel Storage Dis 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - MOTOR ELECTRICO BOMBA DESCARGA DIESEL MINA; 3,8 Kw ; 150KG
2840 Recepcion y traslado de elementos a obra en Diesel 10% CONSTRUCTEXECUTION FRONT 03
2840 Montaje Bomba en Diesel Storage Discharge Area 60% CONSTRUCTEXECUTION FRONT 03
2840 Conexionado (*), Pruebas e Inspeccion en Diesel St 20% CONSTRUCTEXECUTION FRONT 03
2840 Protocolo Entrega de Equipos en Diesel Storage Dis 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - BOMBA DESCARGA DIESEL MINA; 60 M3/H @ 16,7MCF ; 150KG
2840 Recepcion y traslado de elementos a obra en Diesel 10% CONSTRUCTEXECUTION FRONT 03
2840 Montaje Bomba en Diesel Storage Discharge Area 60% CONSTRUCTEXECUTION FRONT 03
2840 Conexionado (*), Pruebas e Inspeccion en Diesel St 20% CONSTRUCTEXECUTION FRONT 03
2840 Protocolo Entrega de Equipos en Diesel Storage Dis 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - MOTOR ELECTRICO BOMBA DESCARGA DIESEL MINA; 3,8 Kw ; 150KG
2840 Recepcion y traslado de elementos a obra en Diesel 10% CONSTRUCTEXECUTION FRONT 03
2840 Montaje Bomba en Diesel Storage Discharge Area 60% CONSTRUCTEXECUTION FRONT 03
2840 Conexionado (*), Pruebas e Inspeccion en Diesel St 20% CONSTRUCTEXECUTION FRONT 03
2840 Protocolo Entrega de Equipos en Diesel Storage Dis 10% CONSTRUCTEXECUTION FRONT 03

ntaje / Ejecución - Escalerilla portaconductores, acero galvanizado en caliente, 300x100 mm


2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 3/4"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Conduit a la vista, acero galvanizado en caliente ANSI C80.1, diámetro 1 1/2"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Conduit a la vista, acero flexible y cubierta de PVC resistente a la radiación UV, diámetro 3/4"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Conduit directamente enterrado, acero galvanizado en caliente ANSI C80.1, diámetro 1"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Conduit en banco de ductos, PVC Schedule 40, diámetro 4"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Conduit en banco de ductos, PVC Schedule 40, diámetro 6"
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 10 AWG, 1x1c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 8 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 12 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de fuerza, cobre, clase 600 V, aislamiento de XLPE, # 14 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 16 AWG, 1x3c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Multiconductor de control, clase 600 V, aislamiento de XLPE, # 16 AWG, 1x5c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Cable de Instrumentación 1x1t;# 18 AWG apantallado
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Cable Profibus PA 1x1p;# 18 AWG, Tipo A
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Cable Profibus DP 1x1p;# 22 AWG Tipo A
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Monoconductor de alumbrado, cobre, clase 600 V, tipo THHN, # 12 AWG, 1x1c
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Tendido terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Cable de cobre desnudo # 4/0 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Cable de cobre desnudo # 2/0 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Monoconductor de fuerza, cobre, aislado, clase 600 V, #8 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Conexionado Cable de Aterrizamiento 1x1c;8 AWG
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Ground Bar In Man Holes (Supplied and installed by Contractor)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Ground Rod 3/4"x3m (Supplied and installed by Contractor)
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", con base horizontal, montado en poste recto ortogonal de acero galvan
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 03
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 70% CONSTRUCTEXECUTION FRONT 03
2010 Protocolos de pruebas y recepcion finales en Electrica 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", con base horizontal, montado en estructura
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 03
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 90% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Pararrayos (punta Franklin) de 1/2"x48", con base horizontal, montado en estructura
2010 Suministro de materiales en Electrical Utilities Bulk 10% CONSTRUCTEXECUTION FRONT 03
2010 Montaje terminado en Electrical Utilities Bulk / Ligh 90% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF POWER CABLE, 600 V, MULTI CONDUCTOR, 3/C AWG 14, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - TERM OF CONTROL CABLE, 600 V, MULTI CONDUCTOR, 3 X 16 AWG, XLPE/LSZH, BLACK
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Instalacion de mufas de terminacion y union y/o ter 50% CONSTRUCTEXECUTION FRONT 03
2630 Conexionado en Primary Crusher Electrical Room (26 20% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Equipo alumbrado público (1 unidad), LED, montaje en poste recto ortogonal de acero galvanizado de 9 m, 159 W
2630 Suministro de materiales en Primary Crusher Electri 10% CONSTRUCTEXECUTION FRONT 03
2630 Montaje terminado en Primary Crusher Electrical Ro 70% CONSTRUCTEXECUTION FRONT 03
2630 Protocolos de pruebas y recepcion finales en Primar 20% CONSTRUCTEXECUTION FRONT 03

ntaje / Ejecución - Transmisor Flujo Tipo Coriolis


2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Indicadores de Presión sin/con Sello
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Indicador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Transmisor de Nivel Tipo Radar Flanged
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Transmisor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Interruptor de Nivel Vibratorio
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Indicadores Remotos Carguío Camiones
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Indicador en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Sirena (Horn)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Sirena en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Baliza (Beacon)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Baliza en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Gabinetes Comunicaciones en Terreno
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Cámaras CCTV OUTDOOR
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
ntaje / Ejecución - Gabinete CCTV Outdoor (Power & Signal)
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03
& Discharge)

bricate - Handling of pipe PIPE XS SMLS STL A106-B, NPS 0.75", Schedule SCH XS
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
bricate - Handling of pipe PIPE XS SMLS STL A106-B, NPS 1.00", Schedule SCH XS
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - Handling of pipe PIPE XS SMLS STL A106-B, NPS 0.75", Schedule SCH XS
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - Handling of pipe PIPE XS SMLS STL A106-B, NPS 1.00", Schedule SCH XS
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - Handling of BA-18: BALL 600# SW CS RTFE HNDL OP, NPS 0.75", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - Handling of BA-18: BALL 600# SW CS RTFE HNDL OP, NPS 1.00", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - Handling of ELL 90 DEG 3000# SW STL A105, NPS 0.75", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - Handling of GA-08: GATE 800# SW CS F6/STEL SEATS HO, NPS 0.75", Schedule
2610 Manejo de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
bricate - Butt Weld / Slip-on SS, NPS 4.00", Schedule SCH STD
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
bricate - Butt Weld / Slip-on SS, NPS 6.00", Schedule SCH STD
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
bricate - Butt Weld / Slip-on SS, NPS 8.00", Schedule SCH10S
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
bricate - Socket Weld SS, NPS 0.75", Schedule SCH XS
2610 Realización de la unión soldada 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - RT, NPS 0.75", Schedule SCH40S
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HYDROSTATIC of PIPE XS SMLS STL A106-B, NPS 0.75", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HYDROSTATIC of PIPE XS SMLS STL A106-B, NPS 1.00", Schedule SCH XS
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E BE, NPS 4.00", Schedule SCH STD
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E BE, NPS 4.00", Schedule SCH STD
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HYDROSTATIC of PIPE ERW CS A53-B TYPE E BE, NPS 8.00", Schedule SCH STD
2610 Realización del examen 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - Double handling of CS A106, NPS 1.50", Schedule SCH XS pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - Double handling of CS A106, NPS 2.00", Schedule SCH XS pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - Double handling of CS A106, NPS 2.00", Schedule SCH XS pipe spools for modification works
2610 Manejo de spool de tuberías y acopio 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, NPS 0.75", Schedule SCH XS
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, NPS 1.00", Schedule SCH XS
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E BE, NPS 4.00", Schedule SCH STD
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E BE, NPS 6.00", Schedule SCH STD
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E BE, NPS 8.00", Schedule SCH STD
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe CH-02: CHECK SWING 150# RF CS F6/STEL, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe ELL 45 DEG STD WT STL A234 WPB, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe ELL 45 DEG STD WT STL A234 WPB, NPS 8.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe ELL 90 DEG LR STD WT STL A234 WPB, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe ELL 90 DEG LR STD WT STL A234 WPB, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe ELL 90 DEG LR STD WT STL A234 WPB, NPS 8.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe FLG BLIND 150# RF STL A105, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe FLG SO 150# RF STL A105, NPS 3.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe FLG SO 150# RF STL A105, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe FLG SO 150# RF STL A105, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe FLG SO 150# RF STL A105, NPS 8.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe GA-19: GATE 150# RF CS A216 WCB HO, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe GA-19: GATE 150# RF CS A216 WCB HO, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe GA-21: GATE 150# RF CS F6/STEL SEATS GO, NPS 8.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe SOCKOLET 4x0.75 3000# STL A105, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe TEE RED 6x4 STD WT STL A234 WPB, NPS 6.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe TEE STD WT STL A234 WPB, NPS 4.00", Schedule
2610 Manejo y montaje de spools de tuberías en su posici 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - Butt Weld / Slip-on SS, NPS 4.00", Schedule SCH STD
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - Butt Weld / Slip-on SS, NPS 6.00", Schedule SCH STD
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - Butt Weld / Slip-on SS, NPS 8.00", Schedule SCH10S
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - Butt Weld / Slip-on SS, NPS 0.75", Schedule SCH XS
2610 Realización de la Unión Soldada en Terreno 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, NPS 0.75", Schedule SCH XS
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe PIPE XS SMLS STL A106-B, NPS 1.00", Schedule SCH XS
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E BE, NPS 4.00", Schedule SCH STD
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E BE, NPS 6.00", Schedule SCH STD
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - HANDLING of pipe PIPE ERW CS A53-B TYPE E BE, NPS 8.00", Schedule SCH STD
2610 Realización de la Prueba 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
tall / Perform - DUCHA EMERGENCIA DESCARGA DIESEL 2840-ES-001
2610 Montaje ducha de seguridad 90% CONSTRUCTEXECUTION FRONT 03
2610 Protocolos aprobados y recibidos oficialmente 10% CONSTRUCTEXECUTION FRONT 03
ministro / Instalación - Soporte de Instalación cámaras CCTV Tipo 1
2610 Recepcion y traslado de elementos a obra en Primar 10% CONSTRUCTEXECUTION FRONT 03
2610 Montaje de Interruptor en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Conexionado (*), Pruebas e Inspeccion en Primary C 40% CONSTRUCTEXECUTION FRONT 03
2610 Contrastación en Primary Crusher 20% CONSTRUCTEXECUTION FRONT 03
2610 Protocolo Entrega de Equipos en Primary Crusher 10% CONSTRUCTEXECUTION FRONT 03

ensamble Cajas de Escaleras eje B, parte inferior - Chancadora


2610 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2610 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2610 Despacho 20% CONSTRUCTEXECUTION FRONT 04
ensamble Cajas de Escaleras eje B, parte superior - Chancadora
2610 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2610 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2610 Despacho 20% CONSTRUCTEXECUTION FRONT 04

dulos fabricados en el taller del proveedor - Primary Crusher DataCenter and washroom
2610 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2610 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2610 Despacho 20% CONSTRUCTEXECUTION FRONT 04
on Rooms (Include Fire detection System)

dulos fabricados en el taller del proveedor - Control Room, UPS & Communication Rooms
2940 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2940 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2940 Despacho 20% CONSTRUCTEXECUTION FRONT 04

Ore Stockpile

ensamble de Mesas de Impacto -Overland Conveyor 2730-CV-002-IMPACT TABLE


2730 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2730 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2730 Despacho 20% CONSTRUCTEXECUTION FRONT 04
ensamble de Mesas de Carga -Overland Conveyor 2730-CV-002 - LOAD TABLE
2730 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2730 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2730 Despacho 20% CONSTRUCTEXECUTION FRONT 04
ensamble de Galerias - Overland Conveyor 2730-CV-001-GALERIES
2730 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2730 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2730 Despacho 20% CONSTRUCTEXECUTION FRONT 04
ensamble de Marco de Poleas de Cabeza - Overland Conveyor 2730-CV-001-HEAD FRAME ASSEMBLY
2730 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2730 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2730 Despacho 20% CONSTRUCTEXECUTION FRONT 04
ensamble de Marco de Poleas de Cola - OVERLAND CONVEYOR 2730-CV-002-TAIL FRAME SYSTEM
2730 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2730 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2730 Despacho 20% CONSTRUCTEXECUTION FRONT 04
eensamble del Sistema Tensor - OVERLAND CONVEYOR 2730-CV-002-TAKE-UP ASSEMBLY
2730 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2730 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2730 Despacho 20% CONSTRUCTEXECUTION FRONT 04
ensamble de Contrapeso - OVERLAND CONVEYOR 2730-CV-002-COUNTERWEIGHT ASSEMBLY
ensamble de Miscelaneos - SACRIFICE BELT CONVEYOR 2730-CV-001-MISCELLANEOUS

ensamble de Mesas de Impacto - Faja de Sacrificio 2730-CV-001-IMPACT TABLE


2730 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2730 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2730 Despacho 20% CONSTRUCTEXECUTION FRONT 04
ensamble de Mesas de Carga - Faja de Sacrificio 2730-CV-001-LOAD TABLE
2730 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2730 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2730 Despacho 20% CONSTRUCTEXECUTION FRONT 04
ensamble de Galerias - Faja de Sacrificio 2730-CV-001-GALERIES
2730 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2730 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2730 Despacho 20% CONSTRUCTEXECUTION FRONT 04
ensamble de Marco de Poleas de Cabeza - Overland Conveyor 2730-CV-001-HEAD FRAME ASSEMBLY
2730 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2730 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2730 Despacho 20% CONSTRUCTEXECUTION FRONT 04
ensamble de Marco de Poleas de Cola - Faja de Sacrificio 2730-CV-001-TAIL FRAME SYSTEM
2730 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2730 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2730 Despacho 20% CONSTRUCTEXECUTION FRONT 04
ensamble del Sistema Tensor - SACRIFICE BELT CONVEYOR 2730-CV-001-MISCELLANEOUS_TAKE-UP ASSEMBLY
2730 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2730 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2730 Despacho 20% CONSTRUCTEXECUTION FRONT 04
ensamble de Contrapeso - SACRIFICE BELT CONVEYOR 2730-CV-001-MISCELLANEOUS_COUNTERWEIGHT ASSEMBLY
2730 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2730 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2730 Despacho 20% CONSTRUCTEXECUTION FRONT 04
ensamble de Miscelaneos - SACRIFICE BELT CONVEYOR 2730-CV-001-MISCELLANEOUS
2730 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2730 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2730 Despacho 20% CONSTRUCTEXECUTION FRONT 04

r Treatment Plant

dulos fabricados en el taller del proveedor - Mine Potable Water Treatment Plant Reagent Warehouse
2930 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2930 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2930 Despacho 20% CONSTRUCTEXECUTION FRONT 04

dulos fabricados en el taller del proveedor - Mine Sewage Treatment Plant washroom (Only Erection) - 2940-YBP-001
2930 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2930 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2930 Despacho 20% CONSTRUCTEXECUTION FRONT 04
dulos fabricados en el taller del proveedor - Mine Sewage Treatment Plant Warehouse
2930 Recepción 20% CONSTRUCTEXECUTION FRONT 04
2930 Pre-ensamble en el patio de pre-ensamblado 60% CONSTRUCTEXECUTION FRONT 04
2930 Despacho 20% CONSTRUCTEXECUTION FRONT 04
dulos fabricados en el taller del proveedor - Mine Sewage Treatment Plant office
2930 Recepción 50% CONSTRUCTEXECUTION FRONT 04
2930 Pre-ensamble en el patio de pre-ensamblado 10% CONSTRUCTEXECUTION FRONT 04
2930 Despacho 40% CONSTRUCTEXECUTION FRONT 04
PAQUETE +TMI GRUPAL
PAQUETE + CWP
AREA NOMBRE

SUBAREA

PAQUETE

CWP
C.AREA NO C.SUBAREA C.PAQUETE C.DISCIPLINA D.PAQ+DIS D. PAQ+TMI GRUP

2000 GENE 2000 - Gene20100GE - Temporary20000GE0000 - Impla20000GE0000 - Implan


20000GE0000 - Impl

2000 GENE 2000 - Gene20100GE - Temporary20000GE0000 - Impla20000GE0000 - Implan


20000GE0000 - Impl

2000 GENE 2010 - Mine2010002 - Access Roa20100020000 - Civil 20100020000 - Civil 20100020000 - Civil

2000 GENE 2010 - Mine2010002 - Access Roa20100020000 - Civil 20100020000 - Civil 20100020000 - Civil

2000 GENE 2010 - Mine2010002 - Access Roa20100020000 - Civil 20100020000 - Civil 20100020000 - Civil

2000 GENE 2010 - Mine2010002 - Access Roa20100020000 - Civil 20100020000 - Civil 20100020000 - Civil

2000 GENE 2010 - Mine2010002 - Access Roa20100020000 - Civil 20100020000 - Civil 20100020000 - Civil

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Electr
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Electr
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Electr

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Electr
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Electr
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Electr

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Electr
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Electr
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Electr

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Electr
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Electr
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Electr

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Electr
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Electr
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Electr

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
ecto ortogonal de acero galvanizado de 6 m
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
ecto ortogonal de acero galvanizado de 18 m
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
ACK JACKET
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
ero galvanizado de 9 m, 258 W
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect

2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical


20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect
2000 GENE 2010 - Mine2010014 - Electrical U20100140006 - Electrical
20100140006
Works (Bill
- Electri
Quantity
20100140006
menciona- 2000/2010)
Elect

2000 GENE 2010 - Mine2010015 - Final Grad 20100150000 - Civil 20100150000 - Civil 20100150000 - Civil

2000 GENE 2010 - Mine2010015 - Final Grad 20100150000 - Civil 20100150000 - Civil 20100150000 - Civil

2000 GENE 2040 - Mine2040002 - Mine Wate20400020004 - Mech20400020004 - Mecha


20400020004 - Mech
2000 GENE 2040 - Mine2040002 - Mine Wate20400020004 - Mech20400020004 - Mecha
20400020004 - Mech
2000 GENE 2040 - Mine2040002 - Mine Wate20400020004 - Mech20400020004 - Mecha
20400020004 - Mech
2000 GENE 2040 - Mine2040002 - Mine Wate20400020004 - Mech20400020004 - Mecha
20400020004 - Mech

2000 GENE 2040 - Mine2040002 - Mine Wate20400020004 - Mech20400020004 - Mecha


20400020004 - Mech
2000 GENE 2040 - Mine2040002 - Mine Wate20400020004 - Mech20400020004 - Mecha
20400020004 - Mech
2000 GENE 2040 - Mine2040002 - Mine Wate20400020004 - Mech20400020004 - Mecha
20400020004 - Mech
2000 GENE 2040 - Mine2040002 - Mine Wate20400020004 - Mech20400020004 - Mecha
20400020004 - Mech

2000 GENE 2040 - Mine2040002 - Mine Wate20400020004 - Mech20400020004 - Mecha


20400020004 - Mech
2000 GENE 2040 - Mine2040002 - Mine Wate20400020004 - Mech20400020004 - Mecha
20400020004 - Mech
2000 GENE 2040 - Mine2040002 - Mine Wate20400020004 - Mech20400020004 - Mecha
20400020004 - Mech
2000 GENE 2040 - Mine2040002 - Mine Wate20400020004 - Mech20400020004 - Mecha
20400020004 - Mech

2000 GENE 2040 - Mine2040002 - Mine Wate20400020004 - Mech20400020004 - Mecha


20400020004 - Mech
2000 GENE 2040 - Mine2040002 - Mine Wate20400020004 - Mech20400020004 - Mecha
20400020004 - Mech
2000 GENE 2040 - Mine2040002 - Mine Wate20400020004 - Mech20400020004 - Mecha
20400020004 - Mech
2000 GENE 2040 - Mine2040002 - Mine Wate20400020004 - Mech20400020004 - Mecha
20400020004 - Mech

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020000 - Civil 26100020000 - Civil 26100020000 - Civil

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020000 - Civil 26100020000 - Civil 26100020000 - Civil

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020000 - Civil 26100020000 - Civil 26100020000 - Civil

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020000 - Civil 26100020000 - Civil 26100020000 - Civil

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020000 - Civil 26100020000 - Civil 26100020000 - Civil

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020000 - Civil 26100020000 - Civil 26100020000 - Civil
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
da, vol <8m3
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
1m <= e < 2m
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
= e <= 1.5m
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
Concreto f´c =280 kg/cm2
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
o f´c =280 kg/cm2
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
f´c =280 kg/cm2
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
creto f´c =350 kg/cm2
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
eto f´c =350 kg/cm2
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
to f´c =350 kg/cm2
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
o f´c =350 kg/cm2
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
Concreto f´c =350 kg/cm2
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
f´c =350 kg/cm2
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
Sobre-espesores - Concreto f´c =350 kg/cm2
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre


26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
creto f´c =100 kg/cm2
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc
2600 PRIM 2610 - Prim2610002 - Primary Cr26100020001 - Conc 26100020001 - Concre
26100020001 - Conc

2600 PRIM 2610 - Prim2610003 - Retainig Wa


26100030000 - Civil 26100030000 - Civil W
26100030000 - Civil

2600 PRIM 2610 - Prim2610003 - Retainig Wa


26100030000 - Civil 26100030000 - Civil W
26100030000 - Civil

2600 PRIM 2610 - Prim2610003 - Retainig Wa


26100030001 - Conc 26100030001 - Concre
26100030001 - Conc

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Stee

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Steel
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040002 - Steel 26100040002 - Steel 26100040002 - Steel

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
m ; 3000 KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
m ; 3000 KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
LY GRILLES WITH DAMPERS 1200X500 mm
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
LY GRILLES WITH DAMPERS 400X250 mm
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
TOR, 1.1 kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
3x12x6m ; 70832,3KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
3x12x1,45m ; 40024,6KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
3x12x6m ; 70832,3KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
3x12x1,45m ; 40024,6KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
5x3,2m ; 19545,9KG Redesign in Progress: 3 stands @ 5,000kg each = 15,000 kg
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
x0,65m ; 869KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
x0,65m ; 869KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
3 ; 3,4x1,99x0,65m ; 904,2KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
; 19 kW ; 1000KG PRIMARY CRUSHER 1 DUMP POCKET DUST SUPPRESSOR SYSTEM
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM
RIMARY CRUSHER 2610
1 DUMP - Prim2610004
POCKET - Primary Cr26100040004
DUST SUPPRESSOR SYSTEM - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
NG DUST SUPPRESSOR SYSTEM #1
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
NG DUST SUPPRESSOR SYSTEM #1 DISTRIBUTION BOX, 0.72 Kw,
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
NG DUST SUPPRESSOR SYSTEM #2
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
NG DUST SUPPRESSOR SYSTEM #2 DISTRIBUTION BOX, 0.72 Kw,
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
000KG PRIMARY CRUSHER 2 DUMP POCKET DUST SUPPRESSOR SYSTEM
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004
RIMARY CRUSHER 2 DUMP POCKET DUST SUPPRESSOR SYSTEM - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
NG DUST SUPPRESSOR SYSTEM #1
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
NG DUST SUPPRESSOR SYSTEM #1 DISTRIBUTION BOX, 0.72 Kw,
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
NG DUST SUPPRESSOR SYSTEM #2
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
NG DUST SUPPRESSOR SYSTEM #2 DISTRIBUTION BOX, 0.72 Kw,
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
min ; 22,5kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
1 ; 379 L/min ; 22,5kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
7 L/min ; 5,5kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
4 L/min ; 0,38kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
ADORA PRIMARIA 1 ; 22,5kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
ADORA PRIMARIA 1 ; 22,5kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
min ; 22,5kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2 ; 379 L/min ; 22,5kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
7 L/min ; 5,5kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
4 L/min ; 0,38kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
ADORA PRIMARIA 2 ; 22,5kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
ADORA PRIMARIA 2 ; 22,5kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
ADORA PRIMARIA 2 ; 22,5kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
x2m ; 90000KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
RIMARIA ; 150kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
RIMARIA ; 150kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
RIMARIA ; 150kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
RA PRIMARIA ; 1500KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
DORA 1 CHANCADORA PRIMARIA ; 5 kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
x2m ; 90000KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
RIMARIA ; 150kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
RIMARIA ; 150kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
RIMARIA ; 150kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
RA PRIMARIA ; 5 kW ; 1500KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
5 T ; 15,2m ; 30 kW ; 2100KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mec
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mec
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mec
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mec
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mec
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mec
5kW ; 1000KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
m ; 7,5kW ; 1000KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
M) ; 7x6x7m ; 50000KG 49,020 Am3/h ; 6.5x4x16.57m ;
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
3/h (26,200 ACFM) ; 4000KG 49,020 Am3/h;
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
IMARIA ; 90 (C) kW ; 4000KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
DO PRIMARIO ; 7,5kW 1.5 kW
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
ECTION), 1500 KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
ION TO FE-001 DISCHARGE CHUTE
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
ION TO FE-001 DISCHARGE CHUTE
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
CRIFICE BELT SKIRBOARD
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
CRIFICE BELT SKIRBOARD
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
02 DISCHARGE CHUTE
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
CRIFICE BELT SKIRBOARD
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
CRIFICE BELT SKIRBOARD
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
70, H=19 m, 1700 KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
ORA PRIMARIA ; 1000KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mec
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mec
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mec
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mec

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2,845x3,81x1,625m ; 30 kW ; 59377KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
NCADO PRIMARIO
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
ARIO ; 1,5 kW ; 1500KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mec
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mec
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mec
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mec
1,625x1,981x0,838m ; 30 kW ; 59377KG
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
NCADO PRIMARIO
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mecha

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha


26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040004 - Mech26100040004 - Mecha
26100040004 - Mech

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
, Schedule
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin


2600 PRIM 2610 - Prim2610004 - Primary Cr26100040005 - Pipin26100040005 - Pipin26100040005 - Pipin

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C

2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W
2600 PRIM 2610 - Prim2610004 - Primary Cr26100040007 - I&C 26100040007 - I&C W26100040007 - I&C W

2600 PRIM 2610 - Prim2610006 - Corrugated26100060000 - Civil 26100060000 - Civil 26100060000 - Civil

2600 PRIM 2610 - Prim2610006 - Corrugated26100060000 - Civil 26100060000 - Civil 26100060000 - Civil

2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre


26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc

2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre


26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc

2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre


26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc

2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre


26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc

2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre


26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc

2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre


26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc

2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre


26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc

2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre


26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc

2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre


26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc

2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre


26100060001 - Conc

2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre


26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc

2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre


26100060001 - Conc

2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre


26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc

2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre


26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc

2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre


26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc

2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre


26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
Cimentación
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
e Sumidero y Sobre-espesores
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
ofundidad <= 2 y Profundidad <= 1.9m
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc

2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre


26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
eto f´c =280 kg/cm2
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
eto f´c =280 kg/cm2
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
Concreto f´c =280 kg/cm2
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
eto f´c =280 kg/cm2
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
Sobre-espesores - Concreto f´c =280 kg/cm2
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2 y Profundidad <= 1.9m - Concreto f´c =280 kg/cm2
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc

2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre


26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc
2600 PRIM 2610 - Prim2610006 - Corrugated26100060001 - Conc 26100060001 - Concre
26100060001 - Conc

2600 PRIM 2610 - Prim2610006 - Corrugated26100060002 - Steel 26100060002 - Steel 26100060002 - Stee
2600 PRIM 2610 - Prim2610006 - Corrugated26100060002 - Steel 26100060002 - Steel 26100060002 - Stee

2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee
2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee
2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee

2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee
2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee
2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee

2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee
2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee
2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee

2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee
2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee
2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee
2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee

2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee
2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee

2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee
2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee

2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee
2600 PRIM 2610 - Prim2610009 - Primary Cr26100090002 - Steel 26100090002 - Steel 26100090002 - Stee

2600 PRIM 2610 - Prim2610009 - Primary Cr26100090003 - Archi26100090003 - Archit26100090003 - Archi


2600 PRIM 2610 - Prim2610009 - Primary Cr26100090003 - Archi26100090003 - Archit26100090003 - Archi
2600 PRIM 2610 - Prim2610009 - Primary Cr26100090003 - Archi26100090003 - Archit26100090003 - Archi

2600 PRIM 2610 - Prim2610009 - Primary Cr26100090003 - Archi26100090003 - Archit26100090003 - Archi


2600 PRIM 2610 - Prim2610009 - Primary Cr26100090003 - Archi26100090003 - Archit26100090003 - Archi
2600 PRIM 2610 - Prim2610009 - Primary Cr26100090003 - Archi26100090003 - Archit26100090003 - Archi

2600 PRIM 2610 - Prim2610016 - Platform E26100160000 - Civil 26100160000 - Civil 26100160000 - Civil

2600 PRIM 2610 - Prim2610016 - Platform E26100160000 - Civil 26100160000 - Civil 26100160000 - Civil

2600 PRIM 2610 - Prim2610016 - Platform E26100160000 - Civil 26100160000 - Civil 26100160000 - Civil

2600 PRIM 2610 - Prim2610016 - Platform E26100160000 - Civil 26100160000 - Civil 26100160000 - Civil

2600 PRIM 2610 - Prim2610016 - Platform E26100160000 - Civil 26100160000 - Civil 26100160000 - Civil

2600 PRIM 2610 - Prim2610016 - Platform E26100160000 - Civil 26100160000 - Civil 26100160000 - Civil

2600 PRIM 2610 - Prim2610016 - Platform E26100160000 - Civil 26100160000 - Civil 26100160000 - Civil

2600 PRIM 2610 - Prim2610016 - Platform E26100160000 - Civil 26100160000 - Civil 26100160000 - Civil

2600 PRIM 2610 - Prim2610016 - Platform E26100160000 - Civil 26100160000 - Civil 26100160000 - Civil

2600 PRIM 2610 - Prim2610016 - Platform E26100160000 - Civil 26100160000 - Civil 26100160000 - Civil

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010000 - Civil 26300010000 - Civil 26300010000 - Civil
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010000 - Civil 26300010000 - Civil 26300010000 - Civil

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010000 - Civil 26300010000 - Civil 26300010000 - Civil

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010000 - Civil 26300010000 - Civil 26300010000 - Civil

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010000 - Civil 26300010000 - Civil 26300010000 - Civil

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010000 - Civil 26300010000 - Civil 26300010000 - Civil

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010000 - Civil 26300010000 - Civil 26300010000 - Civil

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010000 - Civil 26300010000 - Civil 26300010000 - Civil

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010000 - Civil 26300010000 - Civil 26300010000 - Civil

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010000 - Civil 26300010000 - Civil 26300010000 - Civil

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
da, vol <8m3
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
Concreto f´c =280 kg/cm2
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
f´c =280 kg/cm2
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
eto f´c =280 kg/cm2
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
eto f´c =280 kg/cm2
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
to f´c =280 kg/cm2
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
o f´c =280 kg/cm2
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
ncreto f´c =150 kg/cm2
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
oncreto f´c =210 kg/cm2
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
creto f´c =100 kg/cm2
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010001 - Conc 26300010001 - Concre
26300010001 - Conc

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010002 - Steel 26300010002 - Steel 26300010002 - Stee
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010002 - Steel 26300010002 - Steel 26300010002 - Stee
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010002 - Steel 26300010002 - Steel 26300010002 - Stee

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010002 - Steel 26300010002 - Steel 26300010002 - Stee
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010002 - Steel 26300010002 - Steel 26300010002 - Stee
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010002 - Steel 26300010002 - Steel 26300010002 - Stee

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
350 kcmil, 1x1c+SH
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
50 kcmil, 1x1c+SH
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
4/0 AWG, 1x3c+SH
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2/0 AWG, 1x3c+SH
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
4 AWG, 1x3c+SH
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
6 AWG, 1x3c+SH
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
(+Pantalla por triada y total)
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
(+Pantalla por triada y total)
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
350 kcmil, 1x1c+SH
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
# 2/0 AWG, 1x3c+SH
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
# 1/0 AWG, 1x3c+SH
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
# 4/0 AWG, 1x3c+T+SH
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
50 kcmil, 1x1c+SH
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
4/0 AWG, 1x3c+T+SH
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
4/0 AWG, 1x3c+SH
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2/0 AWG, 1x3c+SH
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
4 AWG, 1x3c+SH
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
6 AWG, 1x3c+SH
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
x1P (+Pantalla)
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
(+Pantalla por triada y total)
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
(+Pantalla por triada y total)
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
ecto ortogonal de acero galvanizado de 18 m
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
LSZH, BLACK JACKET
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
ero galvanizado de 9 m, 159 W
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
NE OIL IMMERSED (TAG No.: XXXX-TF-XXX)
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
NE OIL IMMERSED (TAG No.: XXXX-TF-XXX)
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
NE OIL IMMERSED (TAG No.: XXXX-TF-XXX)
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
ONE OIL IMMERSED (TAG No.: XXXX-TF-XXX)
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Electr
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Electr
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Electr
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Electr

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Electr
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Electr
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Electr
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Electr

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Electr
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Electr
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Electr
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Electr

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elec

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Electr
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Electr
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Electr
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Electr
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Electr
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Electr
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Electr
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Electr

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect
2600 PRIM 2630 - Prim2630001 - Primary Cru
26300010006 - Electr26300010006 - Electr26300010006 - Elect

2600 PRIM 2630 - Prim2630001 - Primary Cru


26300010006 - Electr26300010006 - Electr26300010006 - Electr

2700 COARS2730 - Conv2730002 - Sacrificial 27300020000 - Civil 27300020000 - Civil W


27300020000 - Civil

2700 COARS2730 - Conv2730002 - Sacrificial 27300020000 - Civil 27300020000 - Civil W


27300020000 - Civil

2700 COARS2730 - Conv2730002 - Sacrificial 27300020000 - Civil 27300020000 - Civil W


27300020000 - Civil

2700 COARS2730 - Conv2730002 - Sacrificial 27300020000 - Civil 27300020000 - Civil W


27300020000 - Civil

2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre


27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc

2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre


27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc

2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre


27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc

2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre


27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc

2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre


27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc

2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre


27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc

2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre


27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc

2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre


27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc

2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre


27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc

2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre


27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc

2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre


27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc

2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre


27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc

2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre


27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
eto f´c =280 kg/cm2
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
eto f´c =280 kg/cm2
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
g/cm2 (No se encuentra en Base de Medición y Pago)
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc

2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre


27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc
2700 COARS2730 - Conv2730002 - Sacrificial 27300020001 - Conc 27300020001 - Concre
27300020001 - Conc

2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan


27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
HUMEDAD ; 148x2,134x8,7m
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech

2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan


27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha

2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan


27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech

2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan


27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha

2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan


27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech

2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan


27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech

2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan


27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech

2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan


27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech

2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan


27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech

2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan


27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech

2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan


27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech

2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan


27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mech

2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan


27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha

2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan


27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha

2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan


27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha

2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan


27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha
2700 COARS2730 - Conv2730002 - Sacrificial 27300020004 - Mech27300020004 - Mechan
27300020004 - Mecha

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin
2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin
2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin
, Schedule
2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin
2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin
2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin
2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin
2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin
2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin

2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin


2700 COARS2730 - Conv2730002 - Sacrificial 27300020005 - Pipin27300020005 - Piping27300020005 - Pipin
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C W
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C W
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C W
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C W
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C W

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C W
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C W
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C W
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C W
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C W

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C W
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C W
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C W
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C W
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C W

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo


27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C
2700 COARS2730 - Conv2730002 - Sacrificial 27300020007 - I&C 27300020007 - I&C Wo
27300020007 - I&C

2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech


27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec

2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech


27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
16990 Am3/h, 68 Pa
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
16990 Am3/h, 68 Pa
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
16990 Am3/h, 68 Pa
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
16990 Am3/h, 68 Pa
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
16990 Am3/h, 68 Pa
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
16990 Am3/h, 68 Pa
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
16990 Am3/h, 68 Pa
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
16990 Am3/h, 68 Pa
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
16990 Am3/h, 68 Pa
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
16990 Am3/h, 68 Pa
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
16990 Am3/h, 68 Pa
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
16990 Am3/h, 68 Pa
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec

2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech


27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec

2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech


27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec

2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech


27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec

2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech


27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec

2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech


27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec

2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech


27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec

2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech


27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec

2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech


27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec

2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech


27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec

2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech


27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec

2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech


27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec

2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech


27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec
2700 COARS2710A - Coa2710003A - Additiona27100030004A - Mec27100030004A - Mech
27100030004A - Mec

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin


27100030005A - Pip
2700 COARS2710A - Coa2710003A - Additiona27100030005A - Pipi27100030005A - Pipin
27100030005A - Pip

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
x1P (+Pantalla)
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Elec
E OIL IMMERSED (TAG No.: XXXX-TF-XXX)
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele


2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele
2700 COARS2710A - Coa2710003A - Additiona27100030006A - Elect27100030006A - Elect27100030006A - Ele

2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&


2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&

2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&


2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&

2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&


2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&

2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&


2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&

2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&


2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&

2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&


2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&

2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&C


2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&C
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&C
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&C
2700 COARS2710A - Coa2710003A - Additiona27100030007A - I& 27100030007A - I&C27100030007A - I&C

2700 COARS2710A - Coa2710005A - Portal En27100050000A - Civi27100050000A - Civil27100050000A - Civi

2700 COARS2710A - Coa2710005A - Portal En27100050000A - Civi27100050000A - Civil27100050000A - Civi

2700 COARS2710A - Coa2710005A - Portal En27100050000A - Civi27100050000A - Civil27100050000A - Civi

2700 COARS2710A - Coa2710005A - Portal En27100050000A - Civi27100050000A - Civil27100050000A - Civi

2700 COARS2710A - Coa2710005A - Portal En27100050000A - Civi27100050000A - Civil27100050000A - Civi

2700 COARS2710A - Coa2710005A - Portal En27100050000A - Civi27100050000A - Civil27100050000A - Civi

2700 COARS2710A - Coa2710005A - Portal En27100050000A - Civi27100050000A - Civil27100050000A - Civi

2700 COARS2710A - Coa2710005A - Portal En27100050000A - Civi27100050000A - Civil27100050000A - Civi

2700 COARS2710A - Coa2710005A - Portal En27100050000A - Civi27100050000A - Civil27100050000A - Civi

2700 COARS2710A - Coa2710005A - Portal En27100050000A - Civi27100050000A - Civil27100050000A - Civi

2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech


27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec

2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech


27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
16990 Am3/h, 68 Pa
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
16990 Am3/h, 68 Pa
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
16990 Am3/h, 68 Pa
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
16990 Am3/h, 68 Pa
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
16990 Am3/h, 68 Pa
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
16990 Am3/h, 68 Pa
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
16990 Am3/h, 68 Pa
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
16990 Am3/h, 68 Pa
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
16990 Am3/h, 68 Pa
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
16990 Am3/h, 68 Pa
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
16990 Am3/h, 68 Pa
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
16990 Am3/h, 68 Pa
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec

2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech


27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec

2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech


27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec

2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech


27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec

2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech


27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec

2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech


27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec

2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech


27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec

2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech


27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec

2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech


27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec

2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech


27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec

2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech


27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec

2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech


27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec

2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech


27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec
2700 COARS2710B - Coa2710003B - Additiona27100030004B - Mec27100030004B - Mech
27100030004B - Mec

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi


2700 COARS2710B - Coa2710003B - Additiona27100030005B - Pipi27100030005B - Pipin27100030005B - Pipi

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
x1P (+Pantalla)
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Elec
E OIL IMMERSED (TAG No.: XXXX-TF-XXX)
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele


2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele
2700 COARS2710B - Coa2710003B - Additiona27100030006B - Elect27100030006B - Elect27100030006B - Ele

2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&


2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&

2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&


2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&

2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&


2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&

2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&


2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&

2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&


2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&

2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&


2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&

2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&C


2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&C
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&C
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&C
2700 COARS2710B - Coa2710003B - Additiona27100030007B - I&C27100030007B - I&C27100030007B - I&C

2700 COARS2710B - Coa2710005B - Portal En27100050000B - Civi 27100050000B - Civil27100050000B - Civi

2700 COARS2710B - Coa2710005B - Portal En27100050000B - Civi 27100050000B - Civil27100050000B - Civi

2700 COARS2710B - Coa2710005B - Portal En27100050000B - Civi 27100050000B - Civil27100050000B - Civi

2700 COARS2710B - Coa2710005B - Portal En27100050000B - Civi 27100050000B - Civil27100050000B - Civi

2700 COARS2710B - Coa2710005B - Portal En27100050000B - Civi 27100050000B - Civil27100050000B - Civi

2700 COARS2710B - Coa2710005B - Portal En27100050000B - Civi 27100050000B - Civil27100050000B - Civi

2700 COARS2710B - Coa2710005B - Portal En27100050000B - Civi 27100050000B - Civil27100050000B - Civi

2700 COARS2710B - Coa2710005B - Portal En27100050000B - Civi 27100050000B - Civil27100050000B - Civi

2700 COARS2710B - Coa2710005B - Portal En27100050000B - Civi 27100050000B - Civil27100050000B - Civi

2700 COARS2710B - Coa2710005B - Portal En27100050000B - Civi 27100050000B - Civil27100050000B - Civi


2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
1m <= e < 2m
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
eto f´c =280 kg/cm2
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
- Concreto f´c =280 kg/cm2
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
eto f´c =280 kg/cm2
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
to f´c =280 kg/cm2
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
f´c =350 kg/cm2
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010001A
Crusher Ore- Con27300010001A
To Stockpile (Compartido
- Concr
27300010001A
con Frente 03)- Con

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010002A
Crusher Ore- Stee
To Stockpile
27300010002A
(Compartido
- Steel
27300010002A
con Frente 03)- Ste

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010003A
Crusher Ore- Arch
To Stockpile
27300010003A
(Compartido
- Archi
27300010003A
con Frente 03)- Arch
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010003A
Crusher Ore- Arch
To Stockpile
27300010003A
(Compartido
- Archi
27300010003A
con Frente 03)- Arch
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010003A
Crusher Ore- Arch
To Stockpile
27300010003A
(Compartido
- Archi
27300010003A
con Frente 03)- Arch

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010003A
Crusher Ore- Arch
To Stockpile
27300010003A
(Compartido
- Archi
27300010003A
con Frente 03)- Arch
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010003A
Crusher Ore- Arch
To Stockpile
27300010003A
(Compartido
- Archi
27300010003A
con Frente 03)- Arch
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010003A
Crusher Ore- Arch
To Stockpile
27300010003A
(Compartido
- Archi
27300010003A
con Frente 03)- Arch

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
000 Am3/h, 490 Pa
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
000 Am3/h, 490 Pa
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
000 Am3/h, 490 Pa
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
RIFICE CONVEYOR DISCHARGE DUST SUPPRESSOR SYSTEM
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
HARGE DUST SUPPRESSOR SYSTEM DISTRIBUTION BOX, 0.72 Kw,
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
RLAND CONVEYOR DISCHARGE DUST SUPPRESSOR SYSTEM
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
CHARGE DUST SUPPRESSOR SYSTEM DISTRIBUTION BOX, 2.4 Kw,
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
MEDAD ; 4711x1,829x195m
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Me

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
m ; 10 kW ; 1300KG
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
m ; 10 kW ; 1300KG
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010004A
Crusher Ore- Mec
To Stockpile
27300010004A
(Compartido
- Mech
27300010004A
con Frente 03)- Mec

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010005A
Crusher Ore- Pipi27300010005A
To Stockpile (Compartido
- Pipin
27300010005A
con Frente 03)- Pip

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730A - Conveyor


2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C
2700 COARS2730A - Conveyor
2730001A
Belt-From
Overland
Primary
27300010007A
Crusher Ore- I&C27300010007A
To Stockpile (Compartido
- I&C 27300010007A
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
1m <= e < 2m
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
eto f´c =280 kg/cm2
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
- Concreto f´c =280 kg/cm2
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
eto f´c =280 kg/cm2
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
to f´c =280 kg/cm2
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
f´c =350 kg/cm2
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010001B
Crusher Ore- Con27300010001B
To Stockpile (Compartido
- Concr
27300010001B
con Frente 03)- Con

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010002B
Crusher Ore- Stee
To Stockpile
27300010002B
(Compartido
- Steel27300010002B
con Frente 03)- Ste
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010003B
Crusher Ore- Arch
To Stockpile
27300010003B
(Compartido
- Archi
27300010003B
con Frente 03)- Arch
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010003B
Crusher Ore- Arch
To Stockpile
27300010003B
(Compartido
- Archi
27300010003B
con Frente 03)- Arch
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010003B
Crusher Ore- Arch
To Stockpile
27300010003B
(Compartido
- Archi
27300010003B
con Frente 03)- Arch

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010003B
Crusher Ore- Arch
To Stockpile
27300010003B
(Compartido
- Archi
27300010003B
con Frente 03)- Arch
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010003B
Crusher Ore- Arch
To Stockpile
27300010003B
(Compartido
- Archi
27300010003B
con Frente 03)- Arch
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010003B
Crusher Ore- Arch
To Stockpile
27300010003B
(Compartido
- Archi
27300010003B
con Frente 03)- Arch

000 Am3/h, 490 Pa


2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
000 Am3/h, 490 Pa
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
000 Am3/h, 490 Pa
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
RIFICE CONVEYOR DISCHARGE DUST SUPPRESSOR SYSTEM
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
HARGE DUST SUPPRESSOR SYSTEM DISTRIBUTION BOX, 0.72 Kw,
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
RLAND CONVEYOR DISCHARGE DUST SUPPRESSOR SYSTEM
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
CHARGE DUST SUPPRESSOR SYSTEM DISTRIBUTION BOX, 2.4 Kw,
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
MEDAD ; 4711x1,829x195m
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Me

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010004B
Crusher Ore- Mec27300010004B
To Stockpile (Compartido
- Mech
27300010004B
con Frente 03)- Mec

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730B - Conveyor


2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C
2700 COARS2730B - Conveyor
2730001B
Belt-From
Overland
Primary
27300010007B
Crusher Ore- I&C27300010007B
To Stockpile (Compartido
- I&C 27300010007B
Wcon Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
1m <= e < 2m
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
eto f´c =280 kg/cm2
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
- Concreto f´c =280 kg/cm2
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
eto f´c =280 kg/cm2
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
to f´c =280 kg/cm2
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
f´c =350 kg/cm2
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010001C
Crusher Ore- Con27300010001C
To Stockpile (Compartido
- Concr
27300010001C
con Frente 03)- Con

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010002C
Crusher Ore- Stee27300010002C
To Stockpile (Compartido
- Steel27300010002C
con Frente 03)- Ste

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010003C
Crusher Ore- Arch
To Stockpile
27300010003C
(Compartido
- Archi
27300010003C
con Frente 03)- Arch
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010003C
Crusher Ore- Arch
To Stockpile
27300010003C
(Compartido
- Archi
27300010003C
con Frente 03)- Arch
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010003C
Crusher Ore- Arch
To Stockpile
27300010003C
(Compartido
- Archi
27300010003C
con Frente 03)- Arch

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010003C
Crusher Ore- Arch
To Stockpile
27300010003C
(Compartido
- Archi
27300010003C
con Frente 03)- Arch
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010003C
Crusher Ore- Arch
To Stockpile
27300010003C
(Compartido
- Archi
27300010003C
con Frente 03)- Arch
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010003C
Crusher Ore- Arch
To Stockpile
27300010003C
(Compartido
- Archi
27300010003C
con Frente 03)- Arch

000 Am3/h, 490 Pa


2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
000 Am3/h, 490 Pa
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
000 Am3/h, 490 Pa
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
RIFICE CONVEYOR DISCHARGE DUST SUPPRESSOR SYSTEM
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
HARGE DUST SUPPRESSOR SYSTEM DISTRIBUTION BOX, 0.72 Kw,
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
RLAND CONVEYOR DISCHARGE DUST SUPPRESSOR SYSTEM
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
CHARGE DUST SUPPRESSOR SYSTEM DISTRIBUTION BOX, 2.4 Kw,
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
MEDAD ; 4711x1,829x195m
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Me
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Me
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Me
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Me
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Me
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Me

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Me
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Me
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Me
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Me
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Me
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Me

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010004C
Crusher Ore- Mec27300010004C
To Stockpile (Compartido
- Mecha
27300010004C
con Frente 03)- Mec

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2700 COARS2730C - Conveyor


2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C
2700 COARS2730C - Conveyor
2730001C
Belt-From
Overland
Primary
27300010007C
Crusher Ore- I&C
To Stockpile
27300010007C
(Compartido
- I&C 2W7300010007C
con Frente 03)- I&C

2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr

2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr

2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr

2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr

2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr

2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr

2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr

2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr

2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
e Sumidero y Sobre-espesores
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
o f´c =280 kg/cm2
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
Sobre-espesores - Concreto f´c =280 kg/cm2
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr

2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr
2800 MINE 2A810 - Min 2810003 - Water Truc28100030001- Concr28100030001- Concre28100030001- Concr

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin
2800 MINE 2A810 - Min 2810003 - Water Truc28100030005 - Pipin28100030005 - Piping28100030005 - Pipin

2800 MINE 2A810 - Min 2810003 - Water Truc28100030007 - I&C 28100030007 - I&C W28100030007 - I&C
2800 MINE 2A810 - Min 2810003 - Water Truc28100030007 - I&C 28100030007 - I&C W28100030007 - I&C
2800 MINE 2A810 - Min 2810003 - Water Truc28100030007 - I&C 28100030007 - I&C W28100030007 - I&C
2800 MINE 2A810 - Min 2810003 - Water Truc28100030007 - I&C 28100030007 - I&C W28100030007 - I&C
2800 MINE 2A810 - Min 2810003 - Water Truc28100030007 - I&C 28100030007 - I&C W28100030007 - I&C

2800 MINE 2A810 - Min 2810003 - Water Truc28100030007 - I&C 28100030007 - I&C W28100030007 - I&C
2800 MINE 2A810 - Min 2810003 - Water Truc28100030007 - I&C 28100030007 - I&C W28100030007 - I&C
2800 MINE 2A810 - Min 2810003 - Water Truc28100030007 - I&C 28100030007 - I&C W28100030007 - I&C
2800 MINE 2A810 - Min 2810003 - Water Truc28100030007 - I&C 28100030007 - I&C W28100030007 - I&C
2800 MINE 2A810 - Min 2810003 - Water Truc28100030007 - I&C 28100030007 - I&C W28100030007 - I&C

2800 MINE 2A810 - Min 2810003 - Water Truc28100030007 - I&C 28100030007 - I&C W28100030007 - I&C
2800 MINE 2A810 - Min 2810003 - Water Truc28100030007 - I&C 28100030007 - I&C W28100030007 - I&C
2800 MINE 2A810 - Min 2810003 - Water Truc28100030007 - I&C 28100030007 - I&C W28100030007 - I&C
2800 MINE 2A810 - Min 2810003 - Water Truc28100030007 - I&C 28100030007 - I&C W28100030007 - I&C
2800 MINE 2A810 - Min 2810003 - Water Truc28100030007 - I&C 28100030007 - I&C W28100030007 - I&C
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010000 - Civil 29100010000 - Civil 29100010000 - Civil

2900 MINE 2910 - Mine2910001 - Fresh Wate29100010000 - Civil 29100010000 - Civil 29100010000 - Civil

2900 MINE 2910 - Mine2910001 - Fresh Wate29100010000 - Civil 29100010000 - Civil 29100010000 - Civil

2900 MINE 2910 - Mine2910001 - Fresh Wate29100010000 - Civil 29100010000 - Civil 29100010000 - Civil

2900 MINE 2910 - Mine2910001 - Fresh Wate29100010000 - Civil 29100010000 - Civil 29100010000 - Civil

2900 MINE 2910 - Mine2910001 - Fresh Wate29100010000 - Civil 29100010000 - Civil 29100010000 - Civil

2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc

2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc

2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc

2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc

2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc

2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc

2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc

2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc

2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc

2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
e Sumidero y Sobre-espesores
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
o f´c =280 kg/cm2
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc

2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
Sobre-espesores - Concreto f´c =280 kg/cm2
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc

2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc
2900 MINE 2910 - Mine2910001 - Fresh Wate29100010001 - Conc 29100010001 - Concr29100010001 - Conc

2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre


29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc

2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre


29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc

2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre


29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc

2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre


29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc

2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre


29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc

2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre


29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc

2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre


29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc

2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre


29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc

2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre


29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
e Sumidero y Sobre-espesores
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc

2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre


29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
eto f´c =280 kg/cm2
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
o f´c =280 kg/cm2
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
Sobre-espesores - Concreto f´c =280 kg/cm2
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc

2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre


29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc
2900 MINE 2910 - Mine2910005 - Piping A/G29100050001 - Conc 29100050001 - Concre
29100050001 - Conc

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin


2900 MINE 2910 - Mine2910005 - Piping A/G29100050005 - Pipin29100050005 - Piping29100050005 - Pipin

2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo


29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C

2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo


29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C

2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo


29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C

2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo


29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C

2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo


29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C
2900 MINE 2910 - Mine2910005 - Piping A/G29100050007 - I&C 29100050007 - I&C Wo
29100050007 - I&C

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060000 - Civil 29100060000 - Civil 29100060000 - Civil

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060000 - Civil 29100060000 - Civil 29100060000 - Civil

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060000 - Civil 29100060000 - Civil 29100060000 - Civil

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060000 - Civil 29100060000 - Civil 29100060000 - Civil

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
0", Schedule
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
", Schedule
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
", Schedule
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
0", Schedule
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin
2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin


2900 MINE 2910 - Mine2910006 - Yard Pipes29100060005 - Pipin29100060005 - Piping29100060005 - Pipin

2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc

2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc

2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc

2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc

2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc

2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc

2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
estal Octogonal
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc

2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
e Sumidero y Sobre-espesores
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
al - Concreto f´c =280 kg/cm2
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc

2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
Sobre-espesores - Concreto f´c =280 kg/cm2
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
ncreto f´c =150 kg/cm2
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc

2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc
2900 MINE 2920 - Pota2920001 - Potable Wa29200010001 - Conc 29200010001 - Concr29200010001 - Conc

2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect


2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect

2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect


2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect

2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect


2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect

2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec


2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec

2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec


2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec

2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec


2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec

2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec


2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec

2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec


2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec

2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec


2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec

2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec


2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec

2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec


2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec

2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect


2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect

2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect


2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect

2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect


2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect

2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect


2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect

2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect


2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elect

2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec


2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec

2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec


2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec
2900 MINE 2920 - Pota2920001 - Potable Wa29200010006 - Electr29200010006 - Electr29200010006 - Elec

2900 MINE 2920 - Pota2920001 - Potable Wa29200010007 - I&C 29200010007 - I&C W29200010007 - I&C
2900 MINE 2920 - Pota2920001 - Potable Wa29200010007 - I&C 29200010007 - I&C W29200010007 - I&C
2900 MINE 2920 - Pota2920001 - Potable Wa29200010007 - I&C 29200010007 - I&C W29200010007 - I&C
2900 MINE 2920 - Pota2920001 - Potable Wa29200010007 - I&C 29200010007 - I&C W29200010007 - I&C
2900 MINE 2920 - Pota2920001 - Potable Wa29200010007 - I&C 29200010007 - I&C W29200010007 - I&C

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010004 - Mech29300010004 - Mecha


29300010004 - Mech
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010004 - Mech29300010004 - Mecha
29300010004 - Mech
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010004 - Mech29300010004 - Mecha
29300010004 - Mech
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010004 - Mech29300010004 - Mecha
29300010004 - Mech
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010004 - Mech29300010004 - Mecha
29300010004 - Mech

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010004 - Mech29300010004 - Mecha


29300010004 - Mech
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010004 - Mech29300010004 - Mecha
29300010004 - Mech
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010004 - Mech29300010004 - Mecha
29300010004 - Mech
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010004 - Mech29300010004 - Mecha
29300010004 - Mech
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010004 - Mech29300010004 - Mecha
29300010004 - Mech

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elect

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010006 - Electr29300010006 - Electr29300010006 - Elec

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010007 - I&C 29300010007 - I&C W29300010007 - I&C
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010007 - I&C 29300010007 - I&C W29300010007 - I&C
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010007 - I&C 29300010007 - I&C W29300010007 - I&C
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010007 - I&C 29300010007 - I&C W29300010007 - I&C
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010007 - I&C 29300010007 - I&C W29300010007 - I&C

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010007 - I&C 29300010007 - I&C W29300010007 - I&C
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010007 - I&C 29300010007 - I&C W29300010007 - I&C
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010007 - I&C 29300010007 - I&C W29300010007 - I&C
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010007 - I&C 29300010007 - I&C W29300010007 - I&C
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010007 - I&C 29300010007 - I&C W29300010007 - I&C

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010004 - Mech29400010004 - Mecha


29400010004 - Mech
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010004 - Mech29400010004 - Mecha
29400010004 - Mech
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010004 - Mech29400010004 - Mecha
29400010004 - Mech
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010004 - Mech29400010004 - Mecha
29400010004 - Mech
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010004 - Mech29400010004 - Mecha
29400010004 - Mech

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
# 1/0 AWG, 1x3c+SH
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
50 kcmil, 1x1c+SH
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
4 AWG, 1x3c+SH
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
(+Pantalla por triada y total)
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
(+Pantalla por triada y total)
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
# 1/0 AWG, 1x3c+SH
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
50 kcmil, 1x1c+SH
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
4/0 AWG, 1x3c+T+SH
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
4 AWG, 1x3c+SH
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
(+Pantalla por triada y total)
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
(+Pantalla por triada y total)
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
ecto ortogonal de acero galvanizado de 18 m
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elect

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
ero galvanizado de 9 m, 258 W
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
E OIL IMMERSED (TAG No.: XXXX-TF-XXX)
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
NE OIL IMMERSED (TAG No.: XXXX-TF-XXX)
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec
2900 MINE 2940 - Mine2940001 - Mine Sewa29400010006 - Electr29400010006 - Elect 29400010006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040000 - Civil W


29500040000 - Civil 29500040000 - Civil
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040000 - Civil W
29500040000 - Civil 29500040000 - Civil

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040000 - Civil W


29500040000 - Civil 29500040000 - Civil

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040000 - Civil W


29500040000 - Civil 29500040000 - Civil

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040000 - Civil W


29500040000 - Civil 29500040000 - Civil

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040000 - Civil W


29500040000 - Civil 29500040000 - Civil

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040000 - Civil W


29500040000 - Civil 29500040000 - Civil

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040000 - Civil W


29500040000 - Civil 29500040000 - Civil

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
da, vol <8m3
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
1m <= e < 2m
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
Concreto f´c =280 kg/cm2
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
o f´c =280 kg/cm2
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
eto f´c =280 kg/cm2
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
- Concreto f´c =280 kg/cm2
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
eto f´c =280 kg/cm2
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
ncreto f´c =150 kg/cm2
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040001 - Conc 29500040001 - Concr29500040001 - Conc

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
# 1/0 AWG, 1x3c+SH
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
50 kcmil, 1x1c+SH
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
4 AWG, 1x3c+SH
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
(+Pantalla por triada y total)
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
(+Pantalla por triada y total)
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
# 1/0 AWG, 1x3c+SH
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
50 kcmil, 1x1c+SH
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
4/0 AWG, 1x3c+T+SH
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
4 AWG, 1x3c+SH
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
(+Pantalla por triada y total)
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
(+Pantalla por triada y total)
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
ecto ortogonal de acero galvanizado de 18 m
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elect

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
ero galvanizado de 9 m, 258 W
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
E OIL IMMERSED (TAG No.: XXXX-TF-XXX)
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
NE OIL IMMERSED (TAG No.: XXXX-TF-XXX)
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040006 - Electr29500040006 - Electr29500040006 - Elec

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C

2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C
2900 MINE 2950 - Mine2950004 - Mine Pit R29500040007 - I&C 29500040007 - I&C Wo
29500040007 - I&C

2900 MINE 2950 - Mine2950008 - Reclaim W29500080000 - Civil 29500080000 - Civil 29500080000 - Civil

2900 MINE 2950 - Mine2950008 - Reclaim W29500080000 - Civil 29500080000 - Civil 29500080000 - Civil

2900 MINE 2950 - Mine2950008 - Reclaim W29500080000 - Civil 29500080000 - Civil 29500080000 - Civil

2700 COARS2720 - Coar2720001 - Coarse Ore27200010000 - Civil 27200010000 - Civil 27200010000 - Civil

2700 COARS2720 - Coar2720001 - Coarse Ore27200010000 - Civil 27200010000 - Civil 27200010000 - Civil

2700 COARS2720 - Coar2720001 - Coarse Ore27200010000 - Civil 27200010000 - Civil 27200010000 - Civil

2700 COARS2720 - Coar2720001 - Coarse Ore27200010000 - Civil 27200010000 - Civil 27200010000 - Civil

2700 COARS2720 - Coar2720001 - Coarse Ore27200010000 - Civil 27200010000 - Civil 27200010000 - Civil

2700 COARS2720 - Coar2720001 - Coarse Ore27200010000 - Civil 27200010000 - Civil 27200010000 - Civil

2700 COARS2720 - Coar2720001 - Coarse Ore27200010000 - Civil 27200010000 - Civil 27200010000 - Civil

2700 COARS2720 - Coar2720001 - Coarse Ore27200010000 - Civil 27200010000 - Civil 27200010000 - Civil

2700 COARS2720 - Coar2720001 - Coarse Ore27200010000 - Civil 27200010000 - Civil 27200010000 - Civil

2700 COARS2720 - Coar2720001 - Coarse Ore27200010000 - Civil 27200010000 - Civil 27200010000 - Civil

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
da, vol <8m3
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
1m <= e < 2m
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
Concreto f´c =280 kg/cm2
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
o f´c =280 kg/cm2
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
eto f´c =280 kg/cm2
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
- Concreto f´c =280 kg/cm2
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
eto f´c =280 kg/cm2
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
ncreto f´c =150 kg/cm2
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
oncreto f´c =210 kg/cm2
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre


27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc
2700 COARS2720 - Coar2720001 - Coarse Ore27200010001 - Conc 27200010001 - Concre
27200010001 - Conc

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
500 kcmil, 1x1c+SH
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
350 kcmil, 1x1c+SH
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
50 kcmil, 1x1c+SH
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
4/0 AWG, 1x3c+T+SH
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
x1P (+Pantalla)
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
(+Pantalla por triada y total)
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
(+Pantalla por triada y total)
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
ecto ortogonal de acero galvanizado de 18 m
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
LSZH, BLACK JACKET
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
ero galvanizado de 9 m, 159 W
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
ONE OIL IMMERSED (TAG No.: XXXX-TF-XXX)
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
ONE OIL IMMERSED (TAG No.: XXXX-TF-XXX)
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
ONE OIL IMMERSED (TAG No.: XXXX-TF-XXX)
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elec

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect


2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect
2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Elect

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr

2700 COARS2720 - Coar2720001 - Coarse Ore27200010006 - Electr27200010006 - Electr27200010006 - Electr

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
1m <= e < 2m
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
eto f´c =280 kg/cm2
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
- Concreto f´c =280 kg/cm2
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
eto f´c =280 kg/cm2
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
to f´c =280 kg/cm2
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
f´c =350 kg/cm2
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010001D
Crusher Ore- Con27300010001D
To Stockpile (Compartido
- Concr
27300010001D
con Frente 02)- Con

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010002D
Crusher Ore- Stee
To Stockpile
27300010002D
(Compartido
- Steel
27300010002D
con Frente 02)- Ste

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010003D
Crusher Ore- Arch
To Stockpile
27300010003D
(Compartido
- Archi
27300010003D
con Frente 02)- Arch
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010003D
Crusher Ore- Arch
To Stockpile
27300010003D
(Compartido
- Archi
27300010003D
con Frente 02)- Arch
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010003D
Crusher Ore- Arch
To Stockpile
27300010003D
(Compartido
- Archi
27300010003D
con Frente 02)- Arch

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010003D
Crusher Ore- Arch
To Stockpile
27300010003D
(Compartido
- Archi
27300010003D
con Frente 02)- Arch
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010003D
Crusher Ore- Arch
To Stockpile
27300010003D
(Compartido
- Archi
27300010003D
con Frente 02)- Arch
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010003D
Crusher Ore- Arch
To Stockpile
27300010003D
(Compartido
- Archi
27300010003D
con Frente 02)- Arch

000 Am3/h, 490 Pa


2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
000 Am3/h, 490 Pa
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
000 Am3/h, 490 Pa
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
RIFICE CONVEYOR DISCHARGE DUST SUPPRESSOR SYSTEM
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
HARGE DUST SUPPRESSOR SYSTEM DISTRIBUTION BOX, 0.72 Kw,
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
RLAND CONVEYOR DISCHARGE DUST SUPPRESSOR SYSTEM
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
CHARGE DUST SUPPRESSOR SYSTEM DISTRIBUTION BOX, 2.4 Kw,
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
MEDAD ; 4711x1,829x195m
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Me

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
m ; 10 kW ; 1300KG
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
kW ; 1300KG
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
m ; 10 kW ; 1300KG
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010004D
Crusher Ore- Mec
To Stockpile
27300010004D
(Compartido
- Mech
27300010004D
con Frente 02)- Mec

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2700 COARS2730D - Conveyor


2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C
2700 COARS2730D - Conveyor
2730001D
Belt-From
Overland
Primary
27300010007D
Crusher Ore- I&C27300010007D
To Stockpile (Compartido
- I&C 27300010007D
Wcon Frente 02)- I&C

2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee
2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee
2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee

2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee
2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee
2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee

2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee
2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee
2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee

2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee
2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee

2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee
2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee

2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee
2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee

2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee
2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee

2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee
2800 MINE 2A840 - Fuel 2840002 - Light Duty 28400020002 - Steel 28400020002 - Steel 28400020002 - Stee

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040000 - Civil 28400040000 - Civil 28400040000 - Civil

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040000 - Civil 28400040000 - Civil 28400040000 - Civil

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040000 - Civil 28400040000 - Civil 28400040000 - Civil

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040000 - Civil 28400040000 - Civil 28400040000 - Civil

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040000 - Civil 28400040000 - Civil 28400040000 - Civil

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040000 - Civil 28400040000 - Civil 28400040000 - Civil

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040000 - Civil 28400040000 - Civil 28400040000 - Civil

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040000 - Civil 28400040000 - Civil 28400040000 - Civil

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040000 - Civil 28400040000 - Civil 28400040000 - Civil

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040000 - Civil 28400040000 - Civil 28400040000 - Civil

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
o f´c =280 kg/cm2
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
ncreto f´c =150 kg/cm2
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
oncreto f´c =210 kg/cm2
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040001 - Conc 28400040001 - Concre
28400040001 - Conc

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040002 - Steel 28400040002 - Steel 28400040002 - Stee
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040002 - Steel 28400040002 - Steel 28400040002 - Stee
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040002 - Steel 28400040002 - Steel 28400040002 - Stee

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040004 - Mecha


28400040004 - Mechan
28400040004 - Mecha
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040004 - Mecha
28400040004 - Mechan
28400040004 - Mecha
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040004 - Mecha
28400040004 - Mechan
28400040004 - Mecha
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040004 - Mecha
28400040004 - Mechan
28400040004 - Mecha

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040004 - Mecha


28400040004 - Mechan
28400040004 - Mecha
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040004 - Mecha
28400040004 - Mechan
28400040004 - Mecha
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040004 - Mecha
28400040004 - Mechan
28400040004 - Mecha
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040004 - Mecha
28400040004 - Mechan
28400040004 - Mecha

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040004 - Mecha


28400040004 - Mechan
28400040004 - Mecha
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040004 - Mecha
28400040004 - Mechan
28400040004 - Mecha
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040004 - Mecha
28400040004 - Mechan
28400040004 - Mecha
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040004 - Mecha
28400040004 - Mechan
28400040004 - Mecha

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040004 - Mecha


28400040004 - Mechan
28400040004 - Mecha
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040004 - Mecha
28400040004 - Mechan
28400040004 - Mecha
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040004 - Mecha
28400040004 - Mechan
28400040004 - Mecha
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040004 - Mecha
28400040004 - Mechan
28400040004 - Mecha

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Electr
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Electr
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Electr

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Electr
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Electr
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Electr

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Electr
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Electr
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Electr

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Electr
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Electr
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Electr

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Electr
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Electr
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Electr

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Electr
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Electr
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Electr

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
ecto ortogonal de acero galvanizado de 18 m
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elec
ero galvanizado de 9 m, 159 W
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040006 - Electr28400040006 - Electr28400040006 - Elect

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C W
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C W
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C W
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C W
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C W

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C W
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C W
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C W
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C W
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C W

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C

2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin

2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840007 - Piping A/G28400070005 - Pipin28400070005 - Piping28400070005 - Pipin
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C
2800 MINE 2A840 - Fuel 2840004 - Diesel Sto 28400040007 - I&C 28400040007 - I&C Wo
28400040007 - I&C

2600 PRIMA2610 - Prim2610004 - Primary Cr26100040083 - Modul


26100040083 - Modul
26100040083 - Modu
2600 PRIMA2610 - Prim2610004 - Primary Cr26100040083 - Modul
26100040083 - Modul
26100040083 - Modu
2600 PRIMA2610 - Prim2610004 - Primary Cr26100040083 - Modul
26100040083 - Modul
26100040083 - Modu

2600 PRIMA2610 - Prim2610004 - Primary Cr26100040083 - Modul


26100040083 - Modul
26100040083 - Modu
2600 PRIMA2610 - Prim2610004 - Primary Cr26100040083 - Modul
26100040083 - Modul
26100040083 - Modu
2600 PRIMA2610 - Prim2610004 - Primary Cr26100040083 - Modul
26100040083 - Modul
26100040083 - Modu

2600 PRIMA2610 - Prim2610014 - Control Ro26100090083 - Modul


26100090083 - Modul
26100090083 - Mod
2600 PRIMA2610 - Prim2610014 - Control Ro26100090083 - Modul
26100090083 - Modul
26100090083 - Mod
2600 PRIMA2610 - Prim2610014 - Control Ro26100090083 - Modul
26100090083 - Modul
26100090083 - Mod

2600 PRIMA2610 - Prim2610014 - Control Ro26100140083 - Modul


26100140083 - Modul
26100140083 - Mod
2600 PRIMA2610 - Prim2610014 - Control Ro26100140083 - Modul
26100140083 - Modul
26100140083 - Mod
2600 PRIMA2610 - Prim2610014 - Control Ro26100140083 - Modul
26100140083 - Modul
26100140083 - Mod

2700 COARS2730 - Conv2730001 - Overland C27300010083 - Modul


27300010083 - Modula
27300010083 - Modu
2700 COARS2730 - Conv2730001 - Overland C27300010083 - Modul
27300010083 - Modula
27300010083 - Modu
2700 COARS2730 - Conv2730001 - Overland C27300010083 - Modul
27300010083 - Modula
27300010083 - Modu

2700 COARS2730 - Conv2730001 - Overland C27300010083 - Modul


27300010083 - Modula
27300010083 - Modu
2700 COARS2730 - Conv2730001 - Overland C27300010083 - Modul
27300010083 - Modula
27300010083 - Modu
2700 COARS2730 - Conv2730001 - Overland C27300010083 - Modul
27300010083 - Modula
27300010083 - Modu

2700 COARS2730 - Conv2730001 - Overland C27300010083 - Modul


27300010083 - Modula
27300010083 - Modu
2700 COARS2730 - Conv2730001 - Overland C27300010083 - Modul
27300010083 - Modula
27300010083 - Modu
2700 COARS2730 - Conv2730001 - Overland C27300010083 - Modul
27300010083 - Modula
27300010083 - Modu

2700 COARS2730 - Conv2730001 - Overland C27300010083 - Modul


27300010083 - Modula
27300010083 - Modu
2700 COARS2730 - Conv2730001 - Overland C27300010083 - Modul
27300010083 - Modula
27300010083 - Modu
2700 COARS2730 - Conv2730001 - Overland C27300010083 - Modul
27300010083 - Modula
27300010083 - Modu

2700 COARS2730 - Conv2730001 - Overland C27300010083 - Modul


27300010083 - Modula
27300010083 - Modu
2700 COARS2730 - Conv2730001 - Overland C27300010083 - Modul
27300010083 - Modula
27300010083 - Modu
2700 COARS2730 - Conv2730001 - Overland C27300010083 - Modul
27300010083 - Modula
27300010083 - Modu

2700 COARS2730 - Conv2730001 - Overland C27300010083 - Modul


27300010083 - Modula
27300010083 - Modu
2700 COARS2730 - Conv2730001 - Overland C27300010083 - Modul
27300010083 - Modula
27300010083 - Modu
2700 COARS2730 - Conv2730001 - Overland C27300010083 - Modul
27300010083 - Modula
27300010083 - Modu

2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul


27300020083 - Modula
27300020083 - Modu
2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul
27300020083 - Modula
27300020083 - Modu
2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul
27300020083 - Modula
27300020083 - Modu

2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul


27300020083 - Modula
27300020083 - Modu
2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul
27300020083 - Modula
27300020083 - Modu
2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul
27300020083 - Modula
27300020083 - Modu

2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul


27300020083 - Modula
27300020083 - Modu
2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul
27300020083 - Modula
27300020083 - Modu
2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul
27300020083 - Modula
27300020083 - Modu

2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul


27300020083 - Modula
27300020083 - Modu
2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul
27300020083 - Modula
27300020083 - Modu
2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul
27300020083 - Modula
27300020083 - Modu

2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul


27300020083 - Modula
27300020083 - Modu
2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul
27300020083 - Modula
27300020083 - Modu
2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul
27300020083 - Modula
27300020083 - Modu

2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul


27300020083 - Modula
27300020083 - Modu
2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul
27300020083 - Modula
27300020083 - Modu
2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul
27300020083 - Modula
27300020083 - Modu
HT ASSEMBLY
2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul
27300020083 - Modula
27300020083 - Modu
2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul
27300020083 - Modula
27300020083 - Modu
2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul
27300020083 - Modula
27300020083 - Modu

2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul


27300020083 - Modula
27300020083 - Modu
2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul
27300020083 - Modula
27300020083 - Modu
2700 COARS2730 - Conv2730002 - Sacrificial 27300020083 - Modul
27300020083 - Modula
27300020083 - Modu

2900 MINE 2930 - Plan 2930001 - Reverse O 29300010083 - Modu


29300010083 - Modu
29300010083 - Mo
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010083 - Modu
29300010083 - Modu
29300010083 - Mo
2900 MINE 2930 - Plan 2930001 - Reverse O 29300010083 - Modu
29300010083 - Modu
29300010083 - Mo

- 2940-YBP-001
2900 MINE 2940 - Plan 2940001 - Mine Sewa29400010083 - Modul
29400010083 - Modul
29400010083 - Mod
2900 MINE 2940 - Plan 2940001 - Mine Sewa29400010083 - Modul
29400010083 - Modul
29400010083 - Mod
2900 MINE 2940 - Plan 2940001 - Mine Sewa29400010083 - Modul
29400010083 - Modul
29400010083 - Mod

2900 MINE 2940 - Plan 2940001 - Mine Sewa29400010083 - Modul


29400010083 - Modul
29400010083 - Mod
2900 MINE 2940 - Plan 2940001 - Mine Sewa29400010083 - Modul
29400010083 - Modul
29400010083 - Mod
2900 MINE 2940 - Plan 2940001 - Mine Sewa29400010083 - Modul
29400010083 - Modul
29400010083 - Mod

2900 MINE 2940 - Plan 2940001 - Mine Sewa29400010083 - Modul


29400010083 - Modul
29400010083 - Mod
2900 MINE 2940 - Plan 2940001 - Mine Sewa29400010083 - Modul
29400010083 - Modul
29400010083 - Mod
2900 MINE 2940 - Plan 2940001 - Mine Sewa29400010083 - Modul
29400010083 - Modul
29400010083 - Mod
C.TMI GRUPAL

PARTIDA
TMI
C.TMI GRUPAL C.TMI C.PARTIDA Cost ID-QTY

A.90.10.001
IMPLANTACION IMPLANTACION A.90.10.001
A.91.10.002
IMPLANTACION IMPLANTACION A.91.10.002

00.20.003.0001
EXCAVACION EXCAVACION DE ESCARPE 00.20.003.0001 00.20.003.0001
00.30.004.0002
RELLENO RELLENO MASIVO CLASE B 00.30.004.0002 00.30.004.0002
00.30.007.0001
RELLENO PERFILADO SUBRASANTE 00.30.007.0001 00.30.007.0001
00.40.002.0001
RELLENO AFIRMADO PARA PLATAFORM00.40.002.0001 00.40.002.0001
00.40.007.0001
BERMA PRETIL DE SEGURIDAD 00.40.007.0001 00.40.007.0001

60.20.002.0004
CONDUIT SUMINISTRO CONDUIT 60.20.002.0004 60.20.002.0004
CONDUIT MONTAJE CONDUIT 60.20.002.0004 60.20.002.0004
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0004 60.20.002.0004
60.20.002.0007
CONDUIT SUMINISTRO CONDUIT 60.20.002.0007 60.20.002.0007
CONDUIT MONTAJE CONDUIT 60.20.002.0007 60.20.002.0007
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0007 60.20.002.0007
60.20.002.0043
CONDUIT SUMINISTRO CONDUIT 60.20.002.0043 60.20.002.0043
CONDUIT MONTAJE CONDUIT 60.20.002.0043 60.20.002.0043
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0043 60.20.002.0043
60.20.002.0044
CONDUIT SUMINISTRO CONDUIT 60.20.002.0044 60.20.002.0044
CONDUIT MONTAJE CONDUIT 60.20.002.0044 60.20.002.0044
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0044 60.20.002.0044
60.20.002.0058
CONDUIT SUMINISTRO CONDUIT 60.20.002.0058 60.20.002.0058
CONDUIT MONTAJE CONDUIT 60.20.002.0058 60.20.002.0058
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0058 60.20.002.0058
60.30.001.6505
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6505 60.30.001.6505
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6505 60.30.001.6505
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6505 60.30.001.6505
60.30.001.6512
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6512 60.30.001.6512
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6512 60.30.001.6512
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6512 60.30.001.6512
60.30.001.6513
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6513 60.30.001.6513
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6513 60.30.001.6513
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6513 60.30.001.6513
60.30.001.6514
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6514 60.30.001.6514
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6514 60.30.001.6514
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6514 60.30.001.6514
60.30.001.9113
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.9113 60.30.001.9113
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.9113 60.30.001.9113
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.9113 60.30.001.9113
60.30.001.9114
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.9114 60.30.001.9114
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.9114 60.30.001.9114
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.9114 60.30.001.9114
60.40.001.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0001 60.40.001.0001
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0001 60.40.001.0001
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0001 60.40.001.0001
60.40.002.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0001 60.40.002.0001
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0001 60.40.002.0001
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0001 60.40.002.0001
60.40.006.0001
PARARRAYOS SUMINISTRO PARARRAYOS 60.40.006.0001 60.40.006.0001
PARARRAYOS MONTAJE PARARRAYOS 60.40.006.0001 60.40.006.0001
PARARRAYOS PROTOCOLO PARARRAYOS 60.40.006.0001 60.40.006.0001
60.40.006.0004
PARARRAYOS SUMINISTRO PARARRAYOS 60.40.006.0004 60.40.006.0004
PARARRAYOS MONTAJE PARARRAYOS 60.40.006.0004 60.40.006.0004
PARARRAYOS PROTOCOLO PARARRAYOS 60.40.006.0004 60.40.006.0004
60.40.006.0005
PARARRAYOS SUMINISTRO PARARRAYOS 60.40.006.0005 60.40.006.0005
PARARRAYOS MONTAJE PARARRAYOS 60.40.006.0005 60.40.006.0005
PARARRAYOS PROTOCOLO PARARRAYOS 60.40.006.0005 60.40.006.0005
60.50.001.6505
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6505 60.50.001.6505
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6505 60.50.001.6505
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6505 60.50.001.6505
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6505 60.50.001.6505
60.50.001.6512
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6512 60.50.001.6512
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6512 60.50.001.6512
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6512 60.50.001.6512
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6512 60.50.001.6512
60.50.001.6513
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6513 60.50.001.6513
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6513 60.50.001.6513
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6513 60.50.001.6513
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6513 60.50.001.6513
60.50.001.6514
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6514 60.50.001.6514
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6514 60.50.001.6514
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6514 60.50.001.6514
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6514 60.50.001.6514
60.50.001.9113
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.9113 60.50.001.9113
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.9113 60.50.001.9113
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.9113 60.50.001.9113
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.9113 60.50.001.9113
60.50.001.9114
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.9114 60.50.001.9114
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.9114 60.50.001.9114
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.9114 60.50.001.9114
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.9114 60.50.001.9114
60.60.005.0073
ILUMINACION SUMINISTRO ILUMINACION 60.60.005.0073 60.60.005.0073
ILUMINACION MONTAJE ILUMINACION 60.60.005.0073 60.60.005.0073
ILUMINACION PROTOCOLO ILUMINACION 60.60.005.0073 60.60.005.0073
60.60.005.0202
ILUMINACION SUMINISTRO ILUMINACION 60.60.005.0202 60.60.005.0202
ILUMINACION MONTAJE ILUMINACION 60.60.005.0202 60.60.005.0202
ILUMINACION PROTOCOLO ILUMINACION 60.60.005.0202 60.60.005.0202
60.60.005.0203
ILUMINACION SUMINISTRO ILUMINACION 60.60.005.0203 60.60.005.0203
ILUMINACION MONTAJE ILUMINACION 60.60.005.0203 60.60.005.0203
ILUMINACION PROTOCOLO ILUMINACION 60.60.005.0203 60.60.005.0203

00.30.007.0001
RELLENO PERFILADO SUBRASANTE 00.30.007.0001 00.30.007.0001
00.40.002.0001
RELLENO AFIRMADO PARA PLATAFORM00.40.002.0001 00.40.002.0001

40.60.001.1711
BOMBA CENTRIFUGA RECEPCION 40.60.001.1711 40.60.001.1711
BOMBA CENTRIFUGA MONTAJE 40.60.001.1711 40.60.001.1711
BOMBA CENTRIFUGA CONEXIONADO 40.60.001.1711 40.60.001.1711
BOMBA CENTRIFUGA PROTOCOLO DE ENTREGA 40.60.001.1711 40.60.001.1711
40.60.001.1712
BOMBA CENTRIFUGA RECEPCION 40.60.001.1712 40.60.001.1712
BOMBA CENTRIFUGA MONTAJE 40.60.001.1712 40.60.001.1712
BOMBA CENTRIFUGA CONEXIONADO 40.60.001.1712 40.60.001.1712
BOMBA CENTRIFUGA PROTOCOLO DE ENTREGA 40.60.001.1712 40.60.001.1712
40.60.001.1713
BOMBA CENTRIFUGA RECEPCION 40.60.001.1713 40.60.001.1713
BOMBA CENTRIFUGA MONTAJE 40.60.001.1713 40.60.001.1713
BOMBA CENTRIFUGA CONEXIONADO 40.60.001.1713 40.60.001.1713
BOMBA CENTRIFUGA PROTOCOLO DE ENTREGA 40.60.001.1713 40.60.001.1713
40.60.001.1714
BOMBA CENTRIFUGA RECEPCION 40.60.001.1714 40.60.001.1714
BOMBA CENTRIFUGA MONTAJE 40.60.001.1714 40.60.001.1714
BOMBA CENTRIFUGA CONEXIONADO 40.60.001.1714 40.60.001.1714
BOMBA CENTRIFUGA PROTOCOLO DE ENTREGA 40.60.001.1714 40.60.001.1714

00.20.003.0001
EXCAVACION EXCAVACION DE ESCARPE 00.20.003.0001 00.20.003.000
00.25.001.0001
EXCAVACION EXCAVACION PARA PUESTA A T00.25.001.0001 00.25.001.000
00.25.002.0002
EXCAVACION EXCAVACION PARA CONDUIT 00.25.002.0002 00.25.002.000
00.30.001.0007
RELLENO CAMA APOYO TUBERIA 00.30.001.0007 00.30.001.000
00.30.002.0001
RELLENO RELLENO PARA PUESTA A TIER 00.30.002.0001 00.30.002.000
00.30.002.0002
RELLENO RELLENO PARA CONDUIT 00.30.002.0002 00.30.002.000
10.20.001.0001
PERNO SUMINISTRO Y COLOCACION 10.20.001.0001 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0001 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0001 10.20.001.000
10.20.001.0002
PERNO SUMINISTRO Y COLOCACION 10.20.001.0002 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0002 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0002 10.20.001.000
10.20.001.0101
PERNO SUMINISTRO Y COLOCACION 10.20.001.0101 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0101 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0101 10.20.001.010
10.20.001.0102
PERNO SUMINISTRO Y COLOCACION 10.20.001.0102 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0102 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0102 10.20.001.010
10.20.001.0003
PERNO SUMINISTRO Y COLOCACION 10.20.001.0003 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0003 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0003 10.20.001.000
10.20.001.0004
PERNO SUMINISTRO Y COLOCACION 10.20.001.0004 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0004 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0004 10.20.001.000
10.20.001.0103
PERNO SUMINISTRO Y COLOCACION 10.20.001.0103 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0103 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0103 10.20.001.010
10.20.001.0104
PERNO SUMINISTRO Y COLOCACION 10.20.001.0104 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0104 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0104 10.20.001.010
10.20.001.2018
PERNO SUMINISTRO Y COLOCACION 10.20.001.2018 10.20.001.201
PERNO LIMPIEZA PERNO 10.20.001.2018 10.20.001.201
PERNO PROTOCOLO PERNO 10.20.001.2018 10.20.001.201
10.20.002.0001
PERNO SUMINISTRO Y COLOCACION 10.20.002.0001 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0001 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0001 10.20.002.000
10.20.002.0002
PERNO SUMINISTRO Y COLOCACION 10.20.002.0002 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0002 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0002 10.20.002.000
10.20.002.0202
PERNO SUMINISTRO Y COLOCACION 10.20.002.0202 10.20.002.020
PERNO LIMPIEZA PERNO 10.20.002.0202 10.20.002.020
PERNO PROTOCOLO PERNO 10.20.002.0202 10.20.002.020
10.30.001.0001
MORTERO NIVELACIONSUMINISTRO MORTERO CEME10.30.001.0001 10.30.001.000
10.30.001.0002
MORTERO NIVELACIONPLACAS NIVELACIÓN MORTER10.30.001.0002 10.30.001.000
MORTERO NIVELACIONVACIADO MORTERO CEMENTI10.30.001.0002 10.30.001.000
MORTERO NIVELACIONPUNCH LIST MORTERO CEMEN10.30.001.0002 10.30.001.000
10.30.001.0003
MORTERO NIVELACIONSUMINISTRO MORTERO EPOX10.30.001.0003 10.30.001.000
10.30.001.0004
MORTERO NIVELACIONPLACAS NIVELACIÓN MORTER10.30.001.0004 10.30.001.000
MORTERO NIVELACIONVACIADO MORTERO EPOXICO10.30.001.0004 10.30.001.000
MORTERO NIVELACIONPUNCH LIST MORTERO EPOXI 10.30.001.0004 10.30.001.000
10.40.001.0001
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0001 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0001 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0001 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0001 10.40.001.000
10.40.001.0002
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0002 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0002 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0002 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0002 10.40.001.000
10.40.001.0003
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0003 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0003 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0003 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0003 10.40.001.000
10.40.001.0005
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0005 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0005 10.40.001.000
10.40.001.0006
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0006 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0006 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0006 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0006 10.40.001.000
10.40.001.0007
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0007 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0007 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0007 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0007 10.40.001.000
10.40.001.0009
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0009 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0009 10.40.001.000
10.40.001.0010
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0010 10.40.001.001
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0010 10.40.001.001
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0010 10.40.001.001
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0010 10.40.001.001
10.40.001.0020
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0020 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0020 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0020 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0020 10.40.001.002
10.40.001.0021
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0021 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0021 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0021 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0021 10.40.001.002
10.40.001.0022
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0022 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0022 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0022 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0022 10.40.001.002
10.40.001.0023
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0023 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0023 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0023 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0023 10.40.001.002
10.40.001.0026
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0026 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0026 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0026 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0026 10.40.001.002
10.40.001.0027
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0027 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0027 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0027 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0027 10.40.001.002
10.40.001.0028
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0028 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0028 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0028 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0028 10.40.001.002
10.40.002.2801
CONCRETO COLOCACION ACERO 10.40.002.2801 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2801 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2801 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2801 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2801 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2801 10.40.002.280
10.40.002.2802
CONCRETO COLOCACION ACERO 10.40.002.2802 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2802 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2802 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2802 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2802 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2802 10.40.002.280
10.40.002.2803
CONCRETO COLOCACION ACERO 10.40.002.2803 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2803 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2803 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2803 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2803 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2803 10.40.002.280
10.40.002.3507
CONCRETO COLOCACION ACERO 10.40.002.3507 10.40.002.350
CONCRETO ENCOFRADO CONCRETO 10.40.002.3507 10.40.002.350
CONCRETO VACIADO CONCRETO 10.40.002.3507 10.40.002.350
CONCRETO DESCIMBRE CONCRETO 10.40.002.3507 10.40.002.350
CONCRETO LIMPIEZA CONCRETO 10.40.002.3507 10.40.002.350
CONCRETO PUNCH LIST CONCRETO 10.40.002.3507 10.40.002.350
10.40.002.3509
CONCRETO COLOCACION ACERO 10.40.002.3509 10.40.002.350
CONCRETO ENCOFRADO CONCRETO 10.40.002.3509 10.40.002.350
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.3509 10.40.002.350
CONCRETO VACIADO CONCRETO 10.40.002.3509 10.40.002.350
CONCRETO DESCIMBRE CONCRETO 10.40.002.3509 10.40.002.350
CONCRETO LIMPIEZA CONCRETO 10.40.002.3509 10.40.002.350
CONCRETO PUNCH LIST CONCRETO 10.40.002.3509 10.40.002.350
10.40.002.3510
CONCRETO COLOCACION ACERO 10.40.002.3510 10.40.002.351
CONCRETO ENCOFRADO CONCRETO 10.40.002.3510 10.40.002.351
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.3510 10.40.002.351
CONCRETO VACIADO CONCRETO 10.40.002.3510 10.40.002.351
CONCRETO DESCIMBRE CONCRETO 10.40.002.3510 10.40.002.351
CONCRETO LIMPIEZA CONCRETO 10.40.002.3510 10.40.002.351
CONCRETO PUNCH LIST CONCRETO 10.40.002.3510 10.40.002.351
10.40.002.3520
CONCRETO COLOCACION ACERO 10.40.002.3520 10.40.002.352
CONCRETO ENCOFRADO CONCRETO 10.40.002.3520 10.40.002.352
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.3520 10.40.002.352
CONCRETO VACIADO CONCRETO 10.40.002.3520 10.40.002.352
CONCRETO DESCIMBRE CONCRETO 10.40.002.3520 10.40.002.352
CONCRETO LIMPIEZA CONCRETO 10.40.002.3520 10.40.002.352
CONCRETO PUNCH LIST CONCRETO 10.40.002.3520 10.40.002.352
10.40.002.3521
CONCRETO COLOCACION ACERO 10.40.002.3521 10.40.002.3521
CONCRETO ENCOFRADO CONCRETO 10.40.002.3521 10.40.002.3521
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.3521 10.40.002.3521
CONCRETO VACIADO CONCRETO 10.40.002.3521 10.40.002.352
CONCRETO DESCIMBRE CONCRETO 10.40.002.3521 10.40.002.3521
CONCRETO LIMPIEZA CONCRETO 10.40.002.3521 10.40.002.352
CONCRETO PUNCH LIST CONCRETO 10.40.002.3521 10.40.002.3521
10.40.002.3522
CONCRETO COLOCACION ACERO 10.40.002.3522 10.40.002.352
CONCRETO ENCOFRADO CONCRETO 10.40.002.3522 10.40.002.352
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.3522 10.40.002.352
CONCRETO VACIADO CONCRETO 10.40.002.3522 10.40.002.352
CONCRETO DESCIMBRE CONCRETO 10.40.002.3522 10.40.002.352
CONCRETO LIMPIEZA CONCRETO 10.40.002.3522 10.40.002.352
CONCRETO PUNCH LIST CONCRETO 10.40.002.3522 10.40.002.352
10.40.002.3523
CONCRETO COLOCACION ACERO 10.40.002.3523 10.40.002.352
CONCRETO ENCOFRADO CONCRETO 10.40.002.3523 10.40.002.352
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.3523 10.40.002.352
CONCRETO VACIADO CONCRETO 10.40.002.3523 10.40.002.352
CONCRETO DESCIMBRE CONCRETO 10.40.002.3523 10.40.002.352
CONCRETO LIMPIEZA CONCRETO 10.40.002.3523 10.40.002.352
CONCRETO PUNCH LIST CONCRETO 10.40.002.3523 10.40.002.352
10.40.002.3526
CONCRETO COLOCACION ACERO 10.40.002.3526 10.40.002.352
CONCRETO ENCOFRADO CONCRETO 10.40.002.3526 10.40.002.352
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.3526 10.40.002.352
CONCRETO VACIADO CONCRETO 10.40.002.3526 10.40.002.352
CONCRETO DESCIMBRE CONCRETO 10.40.002.3526 10.40.002.352
CONCRETO LIMPIEZA CONCRETO 10.40.002.3526 10.40.002.352
CONCRETO PUNCH LIST CONCRETO 10.40.002.3526 10.40.002.352
10.40.002.3527
CONCRETO COLOCACION ACERO 10.40.002.3527 10.40.002.352
CONCRETO ENCOFRADO CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO VACIADO CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO DESCIMBRE CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO LIMPIEZA CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO PUNCH LIST CONCRETO 10.40.002.3527 10.40.002.352
10.40.002.3528
CONCRETO COLOCACION ACERO 10.40.002.3528 10.40.002.352
CONCRETO ENCOFRADO CONCRETO 10.40.002.3528 10.40.002.352
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.3528 10.40.002.352
CONCRETO VACIADO CONCRETO 10.40.002.3528 10.40.002.352
CONCRETO DESCIMBRE CONCRETO 10.40.002.3528 10.40.002.352
CONCRETO LIMPIEZA CONCRETO 10.40.002.3528 10.40.002.352
CONCRETO PUNCH LIST CONCRETO 10.40.002.3528 10.40.002.352
10.40.002.3540
CONCRETO COLOCACION ACERO 10.40.002.3540 10.40.002.354
CONCRETO ENCOFRADO CONCRETO 10.40.002.3540 10.40.002.354
CONCRETO VACIADO CONCRETO 10.40.002.3540 10.40.002.354
CONCRETO DESCIMBRE CONCRETO 10.40.002.3540 10.40.002.354
CONCRETO LIMPIEZA CONCRETO 10.40.002.3540 10.40.002.354
CONCRETO PUNCH LIST CONCRETO 10.40.002.3540 10.40.002.354
10.60.002.1061
SOLADO ENCOFRADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO VACIADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO DESCIMBRE CONCRETO 10.60.002.1061 10.60.002.106
SOLADO LIMPIEZA CONCRETO 10.60.002.1061 10.60.002.106
SOLADO PUNCH LIST CONCRETO 10.60.002.1061 10.60.002.106
10.60.002.1062
CONCRETO ENCOFRADO CONCRETO 10.60.002.1062 10.60.002.106
CONCRETO VACIADO CONCRETO 10.60.002.1062 10.60.002.106
CONCRETO DESCIMBRE CONCRETO 10.60.002.1062 10.60.002.106
CONCRETO LIMPIEZA CONCRETO 10.60.002.1062 10.60.002.106
CONCRETO PUNCH LIST CONCRETO 10.60.002.1062 10.60.002.106

00.30.003.0002
RELLENO RELLENO MURO TEM 00.30.003.0002 00.30.003.000
00.50.005.0005
RELLENO RELLENO MURO TEM 00.50.005.0005 00.50.005.000

10.20.001.0001
CONCRETO RELLENO MURO TEM 10.20.001.0001 10.20.001.000

20.10.001.0003
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0003 20.10.001.000
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0003 20.10.001.000
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0003 20.10.001.000
20.10.001.0103
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0103 20.10.001.010
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0103 20.10.001.010
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0103 20.10.001.010
20.10.001.0203
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0203 20.10.001.020
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0203 20.10.001.020
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0203 20.10.001.020
20.10.001.0303
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0303 20.10.001.030
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0303 20.10.001.030
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0303 20.10.001.030
20.10.001.0403
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0403 20.10.001.040
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0403 20.10.001.040
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0403 20.10.001.040
20.10.001.0503
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0503 20.10.001.050
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0503 20.10.001.050
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0503 20.10.001.050
20.10.005.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.005.0003 20.10.005.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.005.0003 20.10.005.000
20.10.006.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.006.0003 20.10.006.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.006.0003 20.10.006.000
20.10.008.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.008.0003 20.10.008.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.008.0003 20.10.008.000
20.10.009.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0003 20.10.009.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0003 20.10.009.000
20.10.009.0103
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0103 20.10.009.010
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0103 20.10.009.010
20.10.009.0203
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0203 20.10.009.020
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0203 20.10.009.020
20.10.015.0003
RIEL PUENTE GRUA MONTAJE Y CONEXIÓN RIEL P 20.10.015.0003 20.10.015.000
RIEL PUENTE GRUA PUNCH LIST RIEL PUENTE GRU20.10.015.0003 20.10.015.000

40.70.001.3001
NIVEL 5 - TANQUE DE RECEPCION 40.70.001.3001 40.70.001.3001
NIVEL 5 - TANQUE DE MONTAJE 40.70.001.3001 40.70.001.3001
NIVEL 5 - TANQUE DE CONEXIONADO 40.70.001.3001 40.70.001.3001
NIVEL 5 - TANQUE DE PROTOCOLO DE ENTREGA 40.70.001.3001 40.70.001.3001
40.70.001.3002
NIVEL 5 - TANQUE DE RECEPCION 40.70.001.3002 40.70.001.3002
NIVEL 5 - TANQUE DE MONTAJE 40.70.001.3002 40.70.001.3002
NIVEL 5 - TANQUE DE CONEXIONADO 40.70.001.3002 40.70.001.3002
NIVEL 5 - TANQUE DE PROTOCOLO DE ENTREGA 40.70.001.3002 40.70.001.3002
40.70.001.3003
NIVEL 5 - COMPRESOR RECEPCION 40.70.001.3003 40.70.001.3003
NIVEL 5 - COMPRESOR MONTAJE 40.70.001.3003 40.70.001.3003
NIVEL 5 - COMPRESOR CONEXIONADO 40.70.001.3003 40.70.001.3003
NIVEL 5 - COMPRESOR PROTOCOLO DE ENTREGA 40.70.001.3003 40.70.001.3003
40.70.001.3004
NIVEL 5 - MOTOR ELEC RECEPCION 40.70.001.3004 40.70.001.3004
NIVEL 5 - MOTOR ELEC MONTAJE 40.70.001.3004 40.70.001.3004
NIVEL 5 - MOTOR ELEC CONEXIONADO 40.70.001.3004 40.70.001.3004
NIVEL 5 - MOTOR ELEC PROTOCOLO DE ENTREGA 40.70.001.3004 40.70.001.3004
40.70.001.3005
NIVEL 5 - COMPRESOR RECEPCION 40.70.001.3005 40.70.001.3005
NIVEL 5 - COMPRESOR MONTAJE 40.70.001.3005 40.70.001.3005
NIVEL 5 - COMPRESOR CONEXIONADO 40.70.001.3005 40.70.001.3005
NIVEL 5 - COMPRESOR PROTOCOLO DE ENTREGA 40.70.001.3005 40.70.001.3005
40.70.001.3006
NIVEL 5 - MOTOR ELEC RECEPCION 40.70.001.3006 40.70.001.3006
NIVEL 5 - MOTOR ELEC MONTAJE 40.70.001.3006 40.70.001.3006
NIVEL 5 - MOTOR ELEC CONEXIONADO 40.70.001.3006 40.70.001.3006
NIVEL 5 - MOTOR ELEC PROTOCOLO DE ENTREGA 40.70.001.3006 40.70.001.3006
40.70.001.3007
NIVEL 1 - SECADOR DE RECEPCION 40.70.001.3007 40.70.001.3007
NIVEL 1 - SECADOR DE MONTAJE 40.70.001.3007 40.70.001.3007
NIVEL 1 - SECADOR DE CONEXIONADO 40.70.001.3007 40.70.001.3007
NIVEL 1 - SECADOR DE PROTOCOLO DE ENTREGA 40.70.001.3007 40.70.001.3007
40.30.001.5002
NIVEL 1 - AIR SUPPLY F RECEPCION 40.30.001.5002 40.30.001.5002
NIVEL 1 - AIR SUPPLY F MONTAJE 40.30.001.5002 40.30.001.5002
NIVEL 1 - AIR SUPPLY F MONTAJE DUCTERIA 40.30.001.5002 40.30.001.5002
NIVEL 1 - AIR SUPPLY F CONEXIONADO 40.30.001.5002 40.30.001.5002
NIVEL 1 - AIR SUPPLY F PROTOCOLO DE ENTREGA 40.30.001.5002 40.30.001.5002
40.30.001.5003
NIVEL 1 - AIR SUPPLY RECEPCION 40.30.001.5003 40.30.001.5003
NIVEL 1 - AIR SUPPLY MONTAJE 40.30.001.5003 40.30.001.5003
NIVEL 1 - AIR SUPPLY MONTAJE DUCTERIA 40.30.001.5003 40.30.001.5003
NIVEL 1 - AIR SUPPLY CONEXIONADO 40.30.001.5003 40.30.001.5003
NIVEL 1 - AIR SUPPLY PROTOCOLO DE ENTREGA 40.30.001.5003 40.30.001.5003
40.30.001.5004
NIVEL 1 - MAKE UP AIR RECEPCION 40.30.001.5004 40.30.001.5004
NIVEL 1 - MAKE UP AIR MONTAJE 40.30.001.5004 40.30.001.5004
NIVEL 1 - MAKE UP AIR MONTAJE DUCTERIA 40.30.001.5004 40.30.001.5004
NIVEL 1 - MAKE UP AIR CONEXIONADO 40.30.001.5004 40.30.001.5004
NIVEL 1 - MAKE UP AIR PROTOCOLO DE ENTREGA 40.30.001.5004 40.30.001.5004
40.30.001.5034
NIVEL 1 - VENTILATIO RECEPCION 40.30.001.5034 40.30.001.5034
NIVEL 1 - VENTILATIO MONTAJE 40.30.001.5034 40.30.001.5034
NIVEL 1 - VENTILATIO MONTAJE DUCTERIA 40.30.001.5034 40.30.001.5034
NIVEL 1 - VENTILATIO CONEXIONADO 40.30.001.5034 40.30.001.5034
NIVEL 1 - VENTILATIO PROTOCOLO DE ENTREGA 40.30.001.5034 40.30.001.5034
40.30.001.5035
NIVEL 1 - VENTILATIO RECEPCION 40.30.001.5035 40.30.001.5035
NIVEL 1 - VENTILATIO MONTAJE 40.30.001.5035 40.30.001.5035
NIVEL 1 - VENTILATIO MONTAJE DUCTERIA 40.30.001.5035 40.30.001.5035
NIVEL 1 - VENTILATIO CONEXIONADO 40.30.001.5035 40.30.001.5035
NIVEL 1 - VENTILATIO PROTOCOLO DE ENTREGA 40.30.001.5035 40.30.001.5035
40.30.001.5036
NIVEL 1 - VENTILATIO RECEPCION 40.30.001.5036 40.30.001.503
NIVEL 1 - VENTILATIO MONTAJE 40.30.001.5036 40.30.001.503
NIVEL 1 - VENTILATIO MONTAJE DUCTERIA 40.30.001.5036 40.30.001.503
NIVEL 1 - VENTILATIO CONEXIONADO 40.30.001.5036 40.30.001.503
NIVEL 1 - VENTILATIO PROTOCOLO DE ENTREGA 40.30.001.5036 40.30.001.503
40.30.001.5037
NIVEL 1 - MAKE UP AIR RECEPCION 40.30.001.5037 40.30.001.5037
NIVEL 1 - MAKE UP AIR MONTAJE 40.30.001.5037 40.30.001.5037
NIVEL 1 - MAKE UP AIR MONTAJE DUCTERIA 40.30.001.5037 40.30.001.5037
NIVEL 1 - MAKE UP AIR CONEXIONADO 40.30.001.5037 40.30.001.5037
NIVEL 1 - MAKE UP AIR PROTOCOLO DE ENTREGA 40.30.001.5037 40.30.001.5037
40.30.001.5038
NIVEL 1 - MAKE UP AIR RECEPCION 40.30.001.5038 40.30.001.5038
NIVEL 1 - MAKE UP AIR MONTAJE 40.30.001.5038 40.30.001.5038
NIVEL 1 - MAKE UP AIR MONTAJE DUCTERIA 40.30.001.5038 40.30.001.5038
NIVEL 1 - MAKE UP AIR CONEXIONADO 40.30.001.5038 40.30.001.5038
NIVEL 1 - MAKE UP AIR PROTOCOLO DE ENTREGA 40.30.001.5038 40.30.001.5038
40.30.001.5039
NIVEL 1 - MAKE UP AIR RECEPCION 40.30.001.5039 40.30.001.5039
NIVEL 1 - MAKE UP AIR MONTAJE 40.30.001.5039 40.30.001.5039
NIVEL 1 - MAKE UP AIR MONTAJE DUCTERIA 40.30.001.5039 40.30.001.5039
NIVEL 1 - MAKE UP AIR CONEXIONADO 40.30.001.5039 40.30.001.5039
NIVEL 1 - MAKE UP AIR PROTOCOLO DE ENTREGA 40.30.001.5039 40.30.001.5039
40.30.001.5040
NIVEL 1 - MAKE UP AIR RECEPCION 40.30.001.5040 40.30.001.5040
NIVEL 1 - MAKE UP AIR MONTAJE 40.30.001.5040 40.30.001.5040
NIVEL 1 - MAKE UP AIR MONTAJE DUCTERIA 40.30.001.5040 40.30.001.5040
NIVEL 1 - MAKE UP AIR CONEXIONADO 40.30.001.5040 40.30.001.5040
NIVEL 1 - MAKE UP AIR PROTOCOLO DE ENTREGA 40.30.001.5040 40.30.001.5040
40.70.001.2601
NIVEL 3 - PORTON MANRECEPCION 40.70.001.2601 40.70.001.260
NIVEL 3 - PORTON MANMONTAJE 40.70.001.2601 40.70.001.260
NIVEL 3 - PORTON MANCONEXIONADO 40.70.001.2601 40.70.001.260
NIVEL 3 - PORTON MANPROTOCOLO DE ENTREGA 40.70.001.2601 40.70.001.260
40.70.001.2604
NIVEL 3 - PORTON MANRECEPCION 40.70.001.2604 40.70.001.260
NIVEL 3 - PORTON MANMONTAJE 40.70.001.2604 40.70.001.260
NIVEL 3 - PORTON MANCONEXIONADO 40.70.001.2604 40.70.001.260
NIVEL 3 - PORTON MANPROTOCOLO DE ENTREGA 40.70.001.2604 40.70.001.260
40.70.001.2607
NIVEL 5 - REVESTIMIE RECEPCION 40.70.001.2607 40.70.001.260
NIVEL 5 - REVESTIMIE MONTAJE 40.70.001.2607 40.70.001.260
NIVEL 5 - REVESTIMIE CONEXIONADO 40.70.001.2607 40.70.001.260
NIVEL 5 - REVESTIMIE PROTOCOLO DE ENTREGA 40.70.001.2607 40.70.001.260
40.70.001.2608
NIVEL 3 - REVESTIMIE RECEPCION 40.70.001.2608 40.70.001.260
NIVEL 3 - REVESTIMIE MONTAJE 40.70.001.2608 40.70.001.260
NIVEL 3 - REVESTIMIE CONEXIONADO 40.70.001.2608 40.70.001.260
NIVEL 3 - REVESTIMIE PROTOCOLO DE ENTREGA 40.70.001.2608 40.70.001.260
40.70.001.2609
NIVEL 5 - REVESTIMIE RECEPCION 40.70.001.2609 40.70.001.260
NIVEL 5 - REVESTIMIE MONTAJE 40.70.001.2609 40.70.001.260
NIVEL 5 - REVESTIMIE CONEXIONADO 40.70.001.2609 40.70.001.260
NIVEL 5 - REVESTIMIE PROTOCOLO DE ENTREGA 40.70.001.2609 40.70.001.260
40.70.001.2610
NIVEL 3 - REVESTIMIE RECEPCION 40.70.001.2610 40.70.001.261
NIVEL 3 - REVESTIMIE MONTAJE 40.70.001.2610 40.70.001.261
NIVEL 3 - REVESTIMIE CONEXIONADO 40.70.001.2610 40.70.001.261
NIVEL 3 - REVESTIMIE PROTOCOLO DE ENTREGA 40.70.001.2610 40.70.001.261
40.70.001.2611
NIVEL 6 - ESTRUCTURA RECEPCION 40.70.001.2611 40.70.001.261
NIVEL 6 - ESTRUCTURA MONTAJE 40.70.001.2611 40.70.001.261
NIVEL 6 - ESTRUCTURA CONEXIONADO 40.70.001.2611 40.70.001.261
NIVEL 6 - ESTRUCTURA PROTOCOLO DE ENTREGA 40.70.001.2611 40.70.001.261
40.70.001.2612
NIVEL 5 - SELLO SUPE RECEPCION 40.70.001.2612 40.70.001.261
NIVEL 5 - SELLO SUPE MONTAJE 40.70.001.2612 40.70.001.261
NIVEL 5 - SELLO SUPE CONEXIONADO 40.70.001.2612 40.70.001.261
NIVEL 5 - SELLO SUPE PROTOCOLO DE ENTREGA 40.70.001.2612 40.70.001.261
40.70.001.2614
NIVEL 3 - REVESTIMIE RECEPCION 40.70.001.2614 40.70.001.261
NIVEL 3 - REVESTIMIE MONTAJE 40.70.001.2614 40.70.001.261
NIVEL 3 - REVESTIMIE CONEXIONADO 40.70.001.2614 40.70.001.261
NIVEL 3 - REVESTIMIE PROTOCOLO DE ENTREGA 40.70.001.2614 40.70.001.261
40.70.001.2616
NIVEL 5 - SELLO SUPE RECEPCION 40.70.001.2616 40.70.001.261
NIVEL 5 - SELLO SUPE MONTAJE 40.70.001.2616 40.70.001.261
NIVEL 5 - SELLO SUPE CONEXIONADO 40.70.001.2616 40.70.001.261
NIVEL 5 - SELLO SUPE PROTOCOLO DE ENTREGA 40.70.001.2616 40.70.001.261
40.70.001.2618
NIVEL 3 - REVESTIMIE RECEPCION 40.70.001.2618 40.70.001.261
NIVEL 3 - REVESTIMIE MONTAJE 40.70.001.2618 40.70.001.261
NIVEL 3 - REVESTIMIE CONEXIONADO 40.70.001.2618 40.70.001.261
NIVEL 3 - REVESTIMIE PROTOCOLO DE ENTREGA 40.70.001.2618 40.70.001.261
40.70.001.2620
NIVEL 2 - CAJON COL RECEPCION 40.70.001.2620 40.70.001.262
NIVEL 2 - CAJON COL MONTAJE 40.70.001.2620 40.70.001.262
NIVEL 2 - CAJON COL CONEXIONADO 40.70.001.2620 40.70.001.262
NIVEL 2 - CAJON COL PROTOCOLO DE ENTREGA 40.70.001.2620 40.70.001.262
40.70.001.2621
NIVEL 2 - CAJON COL RECEPCION 40.70.001.2621 40.70.001.262
NIVEL 2 - CAJON COL MONTAJE 40.70.001.2621 40.70.001.262
NIVEL 2 - CAJON COL CONEXIONADO 40.70.001.2621 40.70.001.262
NIVEL 2 - CAJON COL PROTOCOLO DE ENTREGA 40.70.001.2621 40.70.001.262
40.70.001.2622
NIVEL 2 - CAJON COL RECEPCION 40.70.001.2622 40.70.001.262
NIVEL 2 - CAJON COL MONTAJE 40.70.001.2622 40.70.001.262
NIVEL 2 - CAJON COL CONEXIONADO 40.70.001.2622 40.70.001.262
NIVEL 2 - CAJON COL PROTOCOLO DE ENTREGA 40.70.001.2622 40.70.001.262
40.70.001.2625
NIVEL 1 - CHUTE DE D RECEPCION 40.70.001.2625 40.70.001.262
NIVEL 1 - CHUTE DE D MONTAJE 40.70.001.2625 40.70.001.262
NIVEL 1 - CHUTE DE D CONEXIONADO 40.70.001.2625 40.70.001.262
NIVEL 1 - CHUTE DE D PROTOCOLO DE ENTREGA 40.70.001.2625 40.70.001.262
40.70.001.2628
NIVEL 1 - CHUTE ALIMERECEPCION 40.70.001.2628 40.70.001.262
NIVEL 1 - CHUTE ALIMEMONTAJE 40.70.001.2628 40.70.001.262
NIVEL 1 - CHUTE ALIMECONEXIONADO 40.70.001.2628 40.70.001.262
NIVEL 1 - CHUTE ALIMEPROTOCOLO DE ENTREGA 40.70.001.2628 40.70.001.262
40.70.001.2629
NIVEL 1 - CHUTE ALIMERECEPCION 40.70.001.2629 40.70.001.262
NIVEL 1 - CHUTE ALIMEMONTAJE 40.70.001.2629 40.70.001.262
NIVEL 1 - CHUTE ALIMECONEXIONADO 40.70.001.2629 40.70.001.262
NIVEL 1 - CHUTE ALIMEPROTOCOLO DE ENTREGA 40.70.001.2629 40.70.001.262
40.70.001.2632
NIVEL 2 - CHUTE ALI RECEPCION 40.70.001.2632 40.70.001.263
NIVEL 2 - CHUTE ALI MONTAJE 40.70.001.2632 40.70.001.263
NIVEL 2 - CHUTE ALI CONEXIONADO 40.70.001.2632 40.70.001.263
NIVEL 2 - CHUTE ALI PROTOCOLO DE ENTREGA 40.70.001.2632 40.70.001.263
40.70.001.2633
NIVEL 2 - CHUTE DES RECEPCION 40.70.001.2633 40.70.001.263
NIVEL 2 - CHUTE DES MONTAJE 40.70.001.2633 40.70.001.263
NIVEL 2 - CHUTE DES CONEXIONADO 40.70.001.2633 40.70.001.263
NIVEL 2 - CHUTE DES PROTOCOLO DE ENTREGA 40.70.001.2633 40.70.001.263
40.70.001.2634
NIVEL 2 - CHUTE ALI RECEPCION 40.70.001.2634 40.70.001.263
NIVEL 2 - CHUTE ALI MONTAJE 40.70.001.2634 40.70.001.263
NIVEL 2 - CHUTE ALI CONEXIONADO 40.70.001.2634 40.70.001.263
NIVEL 2 - CHUTE ALI PROTOCOLO DE ENTREGA 40.70.001.2634 40.70.001.263
40.70.001.2635
NIVEL 2 - CHUTE DES RECEPCION 40.70.001.2635 40.70.001.263
NIVEL 2 - CHUTE DES MONTAJE 40.70.001.2635 40.70.001.263
NIVEL 2 - CHUTE DES CONEXIONADO 40.70.001.2635 40.70.001.263
NIVEL 2 - CHUTE DES PROTOCOLO DE ENTREGA 40.70.001.2635 40.70.001.263
40.70.001.3806
NIVEL 6 - PRIMARY CR RECEPCION 40.70.001.3806 40.70.001.3806
NIVEL 6 - PRIMARY CR MONTAJE 40.70.001.3806 40.70.001.3806
NIVEL 6 - PRIMARY CR CONEXIONADO 40.70.001.3806 40.70.001.3806
NIVEL 6 - PRIMARY CR PROTOCOLO DE ENTREGA 40.70.001.3806 40.70.001.3806
40.70.001.3807
NIVEL 6 - PRIMARY CR RECEPCION 40.70.001.3807 40.70.001.3807
NIVEL 6 - PRIMARY CR MONTAJE 40.70.001.3807 40.70.001.3807
NIVEL 6 - PRIMARY CR CONEXIONADO 40.70.001.3807 40.70.001.3807
NIVEL 6 - PRIMARY CR PROTOCOLO DE ENTREGA 40.70.001.3807 40.70.001.3807
40.70.001.3808
NIVEL 6 - PRIMARY CR RECEPCION 40.70.001.3808 40.70.001.3808
NIVEL 6 - PRIMARY CR MONTAJE 40.70.001.3808 40.70.001.3808
NIVEL 6 - PRIMARY CR CONEXIONADO 40.70.001.3808 40.70.001.3808
NIVEL 6 - PRIMARY CR PROTOCOLO DE ENTREGA 40.70.001.3808 40.70.001.3808
40.70.001.3809
NIVEL 6 - PRIMARY CR RECEPCION 40.70.001.3809 40.70.001.3809
NIVEL 6 - PRIMARY CR MONTAJE 40.70.001.3809 40.70.001.3809
NIVEL 6 - PRIMARY CR CONEXIONADO 40.70.001.3809 40.70.001.3809
NIVEL 6 - PRIMARY CR PROTOCOLO DE ENTREGA 40.70.001.3809 40.70.001.3809
40.70.001.3810
NIVEL 6 - PRIMARY CR RECEPCION 40.70.001.3810 40.70.001.3810
NIVEL 6 - PRIMARY CR MONTAJE 40.70.001.3810 40.70.001.3810
NIVEL 6 - PRIMARY CR CONEXIONADO 40.70.001.3810 40.70.001.3810
NIVEL 6 - PRIMARY CR PROTOCOLO DE ENTREGA 40.70.001.3810 40.70.001.3810
40.70.001.3811
NIVEL 6 - PRIMARY CR RECEPCION 40.70.001.3811 40.70.001.3811
NIVEL 6 - PRIMARY CR MONTAJE 40.70.001.3811 40.70.001.3811
NIVEL 6 - PRIMARY CR CONEXIONADO 40.70.001.3811 40.70.001.3811
NIVEL 6 - PRIMARY CR PROTOCOLO DE ENTREGA 40.70.001.3811 40.70.001.3811
40.70.001.3813
NIVEL 6 - PRIMARY CR RECEPCION 40.70.001.3813 40.70.001.3813
NIVEL 6 - PRIMARY CR MONTAJE 40.70.001.3813 40.70.001.3813
NIVEL 6 - PRIMARY CR CONEXIONADO 40.70.001.3813 40.70.001.3813
NIVEL 6 - PRIMARY CR PROTOCOLO DE ENTREGA 40.70.001.3813 40.70.001.3813
40.70.001.3814
NIVEL 6 - PRIMARY CR RECEPCION 40.70.001.3814 40.70.001.3814
NIVEL 6 - PRIMARY CR MONTAJE 40.70.001.3814 40.70.001.3814
NIVEL 6 - PRIMARY CR CONEXIONADO 40.70.001.3814 40.70.001.3814
NIVEL 6 - PRIMARY CR PROTOCOLO DE ENTREGA 40.70.001.3814 40.70.001.3814
40.70.001.3815
NIVEL 6 - PRIMARY CR RECEPCION 40.70.001.3815 40.70.001.3815
NIVEL 6 - PRIMARY CR MONTAJE 40.70.001.3815 40.70.001.3815
NIVEL 6 - PRIMARY CR CONEXIONADO 40.70.001.3815 40.70.001.3815
NIVEL 6 - PRIMARY CR PROTOCOLO DE ENTREGA 40.70.001.3815 40.70.001.3815
40.70.001.3816
NIVEL 6 - PRIMARY CR RECEPCION 40.70.001.3816 40.70.001.3816
NIVEL 6 - PRIMARY CR MONTAJE 40.70.001.3816 40.70.001.3816
NIVEL 6 - PRIMARY CR CONEXIONADO 40.70.001.3816 40.70.001.3816
NIVEL 6 - PRIMARY CR PROTOCOLO DE ENTREGA 40.70.001.3816 40.70.001.3816
40.70.001.3817
NIVEL 6 - PRIMARY CR RECEPCION 40.70.001.3817 40.70.001.3817
NIVEL 6 - PRIMARY CR MONTAJE 40.70.001.3817 40.70.001.3817
NIVEL 6 - PRIMARY CR CONEXIONADO 40.70.001.3817 40.70.001.3817
NIVEL 6 - PRIMARY CR PROTOCOLO DE ENTREGA 40.70.001.3817 40.70.001.3817
40.70.001.3818
NIVEL 6 - PRIMARY CR RECEPCION 40.70.001.3818 40.70.001.3818
NIVEL 6 - PRIMARY CR MONTAJE 40.70.001.3818 40.70.001.3818
NIVEL 6 - PRIMARY CR CONEXIONADO 40.70.001.3818 40.70.001.3818
NIVEL 6 - PRIMARY CR PROTOCOLO DE ENTREGA 40.70.001.3818 40.70.001.3818
40.80.001.0101
NIVEL 4 - BOTTOM SHELRECEPCION 40.80.001.0101 40.80.001.010
NIVEL 4 - BOTTOM SHELMONTAJE CHANCADOR 40.80.001.0101 40.80.001.010
NIVEL 4 - BOTTOM SHELMONTAJE LUBRICANTE Y PERI40.80.001.0101 40.80.001.010
NIVEL 4 - BOTTOM SHELCONEXIONADO 40.80.001.0101 40.80.001.010
NIVEL 4 - BOTTOM SHELPROTOCOLO DE ENTREGA 40.80.001.0101 40.80.001.010
40.80.001.0101
NIVEL 4 - EXCENTRICA 1RECEPCION 40.80.001.0101 40.80.001.010
NIVEL 4 - EXCENTRICA 1MONTAJE CHANCADOR 40.80.001.0101 40.80.001.010
NIVEL 4 - EXCENTRICA 1MONTAJE LUBRICANTE Y PERI40.80.001.0101 40.80.001.010
NIVEL 4 - EXCENTRICA 1CONEXIONADO 40.80.001.0101 40.80.001.010
NIVEL 4 - EXCENTRICA 1PROTOCOLO DE ENTREGA 40.80.001.0101 40.80.001.010
40.80.001.0101
NIVEL 4 - COUNTERSHARECEPCION 40.80.001.0101 40.80.001.010
NIVEL 4 - COUNTERSHAMONTAJE CHANCADOR 40.80.001.0101 40.80.001.010
NIVEL 4 - COUNTERSHAMONTAJE LUBRICANTE Y PERI40.80.001.0101 40.80.001.010
NIVEL 4 - COUNTERSHACONEXIONADO 40.80.001.0101 40.80.001.010
NIVEL 4 - COUNTERSHAPROTOCOLO DE ENTREGA 40.80.001.0101 40.80.001.010
40.80.001.0101
NIVEL 4 - DUST BONNETRECEPCION 40.80.001.0101 40.80.001.010
NIVEL 4 - DUST BONNETMONTAJE CHANCADOR 40.80.001.0101 40.80.001.010
NIVEL 4 - DUST BONNETMONTAJE LUBRICANTE Y PERI40.80.001.0101 40.80.001.010
NIVEL 4 - DUST BONNETCONEXIONADO 40.80.001.0101 40.80.001.010
NIVEL 4 - DUST BONNETPROTOCOLO DE ENTREGA 40.80.001.0101 40.80.001.010
40.80.001.0101
NIVEL 4 - MIDDLE SHELLRECEPCION 40.80.001.0101 40.80.001.010
NIVEL 4 - MIDDLE SHELLMONTAJE CHANCADOR 40.80.001.0101 40.80.001.010
NIVEL 4 - MIDDLE SHELLMONTAJE LUBRICANTE Y PERI40.80.001.0101 40.80.001.010
NIVEL 4 - MIDDLE SHELLCONEXIONADO 40.80.001.0101 40.80.001.010
NIVEL 4 - MIDDLE SHELLPROTOCOLO DE ENTREGA 40.80.001.0101 40.80.001.010
40.80.001.0101
NIVEL 4 - TOP SHELL 1 RECEPCION 40.80.001.0101 40.80.001.010
NIVEL 4 - TOP SHELL 1 MONTAJE CHANCADOR 40.80.001.0101 40.80.001.010
NIVEL 4 - TOP SHELL 1 MONTAJE LUBRICANTE Y PERI40.80.001.0101 40.80.001.010
NIVEL 4 - TOP SHELL 1 CONEXIONADO 40.80.001.0101 40.80.001.010
NIVEL 4 - TOP SHELL 1 PROTOCOLO DE ENTREGA 40.80.001.0101 40.80.001.010
40.80.001.0101
NIVEL 5 - MAIN SHAFT RECEPCION 40.80.001.0101 40.80.001.010
NIVEL 5 - MAIN SHAFT MONTAJE CHANCADOR 40.80.001.0101 40.80.001.010
NIVEL 5 - MAIN SHAFT MONTAJE LUBRICANTE Y PERI40.80.001.0101 40.80.001.010
NIVEL 5 - MAIN SHAFT CONEXIONADO 40.80.001.0101 40.80.001.010
NIVEL 5 - MAIN SHAFT PROTOCOLO DE ENTREGA 40.80.001.0101 40.80.001.010
40.80.001.0101
NIVEL 5 - SPIDER 1 RECEPCION 40.80.001.0101 40.80.001.010
NIVEL 5 - SPIDER 1 MONTAJE CHANCADOR 40.80.001.0101 40.80.001.010
NIVEL 5 - SPIDER 1 MONTAJE LUBRICANTE Y PERI40.80.001.0101 40.80.001.010
NIVEL 5 - SPIDER 1 CONEXIONADO 40.80.001.0101 40.80.001.010
NIVEL 5 - SPIDER 1 PROTOCOLO DE ENTREGA 40.80.001.0101 40.80.001.010
40.80.001.0102
NIVEL 3 - UNIDAD DE RECEPCION LUBRICADOR 40.80.001.0102 40.80.001.0102
NIVEL 3 - UNIDAD DE MONTAJE CHACADORA P/LUB40.80.001.0102 40.80.001.0102
NIVEL 3 - UNIDAD DE MONTAJE LUBRICADOR 40.80.001.0102 40.80.001.0102
NIVEL 3 - UNIDAD DE CONEXIONADO LUBRICADOR 40.80.001.0102 40.80.001.0102
NIVEL 3 - UNIDAD DE PROTOCOLOS LUBRICADOR 40.80.001.0102 40.80.001.0102
40.80.001.0103
NIVEL 3 - MOTOR ELE RECEPCION MOTOR ELECTRIC 40.80.001.0103 40.80.001.0103
NIVEL 3 - MOTOR ELE MONTAJE CHANCADORA 40.80.001.0103 40.80.001.0103
NIVEL 3 - MOTOR ELE MONTAJE LUBRICACION 40.80.001.0103 40.80.001.0103
NIVEL 3 - MOTOR ELE CONEXIONADO MOTOR ELECT40.80.001.0103 40.80.001.0103
NIVEL 3 - MOTOR ELE PROTOCOLOS MOTOR ELECTRI40.80.001.0103 40.80.001.0103
40.80.001.0104
NIVEL 3 - MOTOR ELE RECEPCION MOTOR ELECTRIC 40.80.001.0104 40.80.001.0104
NIVEL 3 - MOTOR ELE MONTAJE CHANCADORA 40.80.001.0104 40.80.001.0104
NIVEL 3 - MOTOR ELE MONTAJE LUBRICACION 40.80.001.0104 40.80.001.0104
NIVEL 3 - MOTOR ELE CONEXIONADO MOTOR ELECT40.80.001.0104 40.80.001.0104
NIVEL 3 - MOTOR ELE PROTOCOLOS MOTOR ELECTRI40.80.001.0104 40.80.001.0104
40.80.001.0105
NIVEL 5 - MOTOR ELE RECEPCION MOTOR ELECTRIC 40.80.001.0105 40.80.001.0105
NIVEL 5 - MOTOR ELE MONTAJE CHANCADORA 40.80.001.0105 40.80.001.0105
NIVEL 5 - MOTOR ELE MONTAJE LUBRICACION 40.80.001.0105 40.80.001.0105
NIVEL 5 - MOTOR ELE CONEXIONADO MOTOR ELECT40.80.001.0105 40.80.001.0105
NIVEL 5 - MOTOR ELE PROTOCOLOS MOTOR ELECTRI40.80.001.0105 40.80.001.0105
40.80.001.0106
NIVEL 5 - MOTOR ELE RECEPCION MOTOR ELECTRIC 40.80.001.0106 40.80.001.0106
NIVEL 5 - MOTOR ELE MONTAJE CHANCADORA 40.80.001.0106 40.80.001.0106
NIVEL 5 - MOTOR ELE MONTAJE LUBRICACION 40.80.001.0106 40.80.001.0106
NIVEL 5 - MOTOR ELE CONEXIONADO MOTOR ELECT40.80.001.0106 40.80.001.0106
NIVEL 5 - MOTOR ELE PROTOCOLOS MOTOR ELECTRI40.80.001.0106 40.80.001.0106
40.80.001.0107
NIVEL 4 - MOTOR ELEC RECEPCION MOTOR ELECTRIC 40.80.001.0107 40.80.001.0107
NIVEL 4 - MOTOR ELEC MONTAJE CHANCADORA 40.80.001.0107 40.80.001.0107
NIVEL 4 - MOTOR ELEC MONTAJE LUBRICACION 40.80.001.0107 40.80.001.0107
NIVEL 4 - MOTOR ELEC CONEXIONADO MOTOR ELECT40.80.001.0107 40.80.001.0107
NIVEL 4 - MOTOR ELEC PROTOCOLOS MOTOR ELECTRI40.80.001.0107 40.80.001.0107
40.80.001.0108
NIVEL 3 - SISTEMA LU RECEPCION LUBRICADOR 40.80.001.0108 40.80.001.0108
NIVEL 3 - SISTEMA LU MONTAJE CHACADORA P/LUB40.80.001.0108 40.80.001.0108
NIVEL 3 - SISTEMA LU MONTAJE LUBRICADOR 40.80.001.0108 40.80.001.0108
NIVEL 3 - SISTEMA LU CONEXIONADO LUBRICADOR 40.80.001.0108 40.80.001.0108
NIVEL 3 - SISTEMA LU PROTOCOLOS LUBRICADOR 40.80.001.0108 40.80.001.0108
40.80.001.0109
NIVEL 3 - MOTOR ELEC RECEPCION MOTOR ELECTRIC 40.80.001.0109 40.80.001.0109
NIVEL 3 - MOTOR ELEC MONTAJE CHANCADORA 40.80.001.0109 40.80.001.0109
NIVEL 3 - MOTOR ELEC MONTAJE LUBRICACION 40.80.001.0109 40.80.001.0109
NIVEL 3 - MOTOR ELEC CONEXIONADO MOTOR ELECT40.80.001.0109 40.80.001.0109
NIVEL 3 - MOTOR ELEC PROTOCOLOS MOTOR ELECTRI40.80.001.0109 40.80.001.0109
40.80.001.0110
NIVEL 4 - MOTOR ELEC RECEPCION MOTOR ELECTRIC 40.80.001.0110 40.80.001.0110
NIVEL 4 - MOTOR ELEC MONTAJE CHANCADORA 40.80.001.0110 40.80.001.0110
NIVEL 4 - MOTOR ELEC MONTAJE LUBRICACION 40.80.001.0110 40.80.001.0110
NIVEL 4 - MOTOR ELEC CONEXIONADO MOTOR ELECT40.80.001.0110 40.80.001.0110
NIVEL 4 - MOTOR ELEC PROTOCOLOS MOTOR ELECTRI40.80.001.0110 40.80.001.0110
40.80.001.0111
NIVEL 4 - SISTEMA SE RECEPCION SELLO POLVO 40.80.001.0111 40.80.001.0111
NIVEL 4 - SISTEMA SE MONTAJE CHANCADORA 40.80.001.0111 40.80.001.0111
NIVEL 4 - SISTEMA SE MONTAJE LUBRICADOR 40.80.001.0111 40.80.001.0111
NIVEL 4 - SISTEMA SE CONEXIONADO SECADOR 40.80.001.0111 40.80.001.0111
NIVEL 4 - SISTEMA SE PROTOCOLOS SECADOR 40.80.001.0111 40.80.001.0111
40.80.001.0112
NIVEL 4 - MOTOR ELEC RECEPCION MOTOR ELECTRIC 40.80.001.0112 40.80.001.0112
NIVEL 4 - MOTOR ELEC MONTAJE CHANCADORA 40.80.001.0112 40.80.001.0112
NIVEL 4 - MOTOR ELEC MONTAJE LUBRICACION 40.80.001.0112 40.80.001.0112
NIVEL 4 - MOTOR ELEC CONEXIONADO MOTOR ELECT40.80.001.0112 40.80.001.0112
NIVEL 4 - MOTOR ELEC PROTOCOLOS MOTOR ELECTRI40.80.001.0112 40.80.001.0112
40.80.001.0113
NIVEL 4 - SISTEMA DE RECEPCION EQUIPOS 40.80.001.0113 40.80.001.0113
NIVEL 4 - SISTEMA DE MONTAJE CHANCADORA 40.80.001.0113 40.80.001.0113
NIVEL 4 - SISTEMA DE MONTAJE LUBRICACION 40.80.001.0113 40.80.001.0113
NIVEL 4 - SISTEMA DE CONEXIONADO EQUIPOS 40.80.001.0113 40.80.001.0113
NIVEL 4 - SISTEMA DE PROTOCOLO EQUIPOS 40.80.001.0113 40.80.001.0113
40.80.001.0114
NIVEL 4 - MOTOR ELEC RECEPCION EQUIPOS 40.80.001.0114 40.80.001.0114
NIVEL 4 - MOTOR ELEC MONTAJE CHANCADORA 40.80.001.0114 40.80.001.0114
NIVEL 4 - MOTOR ELEC MONTAJE LUBRICACION 40.80.001.0114 40.80.001.0114
NIVEL 4 - MOTOR ELEC CONEXIONADO EQUIPOS 40.80.001.0114 40.80.001.0114
NIVEL 4 - MOTOR ELEC PROTOCOLO EQUIPOS 40.80.001.0114 40.80.001.0114
40.80.001.0115
NIVEL 4 - MOTOR ELEC RECEPCION EQUIPOS 40.80.001.0115 40.80.001.0115
NIVEL 4 - MOTOR ELEC MONTAJE CHANCADORA 40.80.001.0115 40.80.001.0115
NIVEL 4 - MOTOR ELEC MONTAJE LUBRICACION 40.80.001.0115 40.80.001.0115
NIVEL 4 - MOTOR ELEC CONEXIONADO EQUIPOS 40.80.001.0115 40.80.001.0115
NIVEL 4 - MOTOR ELEC PROTOCOLO EQUIPOS 40.80.001.0115 40.80.001.0115
40.80.001.0116
NIVEL 6 - REPUESTO D RECEPCION EQUIPOS 40.80.001.0116 40.80.001.0116
NIVEL 6 - REPUESTO D MONTAJE CHANCADORA 40.80.001.0116 40.80.001.0116
NIVEL 6 - REPUESTO D MONTAJE LUBRICACION 40.80.001.0116 40.80.001.0116
NIVEL 6 - REPUESTO D CONEXIONADO EQUIPOS 40.80.001.0116 40.80.001.0116
NIVEL 6 - REPUESTO D PROTOCOLO EQUIPOS 40.80.001.0116 40.80.001.0116
40.80.001.0117
NIVEL 6 - SISTEMA DE RECEPCION EQUIPOS 40.80.001.0117 40.80.001.0117
NIVEL 6 - SISTEMA DE MONTAJE CHANCADORA 40.80.001.0117 40.80.001.0117
NIVEL 6 - SISTEMA DE MONTAJE LUBRICACION 40.80.001.0117 40.80.001.0117
NIVEL 6 - SISTEMA DE CONEXIONADO EQUIPOS 40.80.001.0117 40.80.001.0117
NIVEL 6 - SISTEMA DE PROTOCOLO EQUIPOS 40.80.001.0117 40.80.001.0117
40.80.001.0118
NIVEL 4 - BOTTOM SHELRECEPCION EQUIPOS 40.80.001.0118 40.80.001.011
NIVEL 4 - BOTTOM SHELMONTAJE CHANCADORA 40.80.001.0118 40.80.001.011
NIVEL 4 - BOTTOM SHELMONTAJE LUBRICACION Y PER40.80.001.0118 40.80.001.011
NIVEL 4 - BOTTOM SHELCONEXIONADO EQUIPOS 40.80.001.0118 40.80.001.011
NIVEL 4 - BOTTOM SHELPROTOCOLO EQUIPOS 40.80.001.0118 40.80.001.011
40.80.001.0118
NIVEL 4 - EXCENTRICA 2RECEPCION EQUIPOS 40.80.001.0118 40.80.001.011
NIVEL 4 - EXCENTRICA 2MONTAJE CHANCADORA 40.80.001.0118 40.80.001.011
NIVEL 4 - EXCENTRICA 2MONTAJE LUBRICACION Y PER40.80.001.0118 40.80.001.011
NIVEL 4 - EXCENTRICA 2CONEXIONADO EQUIPOS 40.80.001.0118 40.80.001.011
NIVEL 4 - EXCENTRICA 2PROTOCOLO EQUIPOS 40.80.001.0118 40.80.001.011
40.80.001.0118
NIVEL 4 - COUNTERSHARECEPCION EQUIPOS 40.80.001.0118 40.80.001.011
NIVEL 4 - COUNTERSHAMONTAJE CHANCADORA 40.80.001.0118 40.80.001.011
NIVEL 4 - COUNTERSHAMONTAJE LUBRICACION Y PER40.80.001.0118 40.80.001.011
NIVEL 4 - COUNTERSHACONEXIONADO EQUIPOS 40.80.001.0118 40.80.001.011
NIVEL 4 - COUNTERSHAPROTOCOLO EQUIPOS 40.80.001.0118 40.80.001.011
40.80.001.0118
NIVEL 4 - DUST BONNETRECEPCION EQUIPOS 40.80.001.0118 40.80.001.011
NIVEL 4 - DUST BONNETMONTAJE CHANCADORA 40.80.001.0118 40.80.001.011
NIVEL 4 - DUST BONNETMONTAJE LUBRICACION Y PER40.80.001.0118 40.80.001.011
NIVEL 4 - DUST BONNETCONEXIONADO EQUIPOS 40.80.001.0118 40.80.001.011
NIVEL 4 - DUST BONNETPROTOCOLO EQUIPOS 40.80.001.0118 40.80.001.011
40.80.001.0118
NIVEL 4 - MIDDLE SHELLRECEPCION EQUIPOS 40.80.001.0118 40.80.001.011
NIVEL 4 - MIDDLE SHELLMONTAJE CHANCADORA 40.80.001.0118 40.80.001.011
NIVEL 4 - MIDDLE SHELLMONTAJE LUBRICACION Y PER40.80.001.0118 40.80.001.011
NIVEL 4 - MIDDLE SHELLCONEXIONADO EQUIPOS 40.80.001.0118 40.80.001.011
NIVEL 4 - MIDDLE SHELLPROTOCOLO EQUIPOS 40.80.001.0118 40.80.001.011
40.80.001.0118
NIVEL 4 - TOP SHELL 2 RECEPCION EQUIPOS 40.80.001.0118 40.80.001.011
NIVEL 4 - TOP SHELL 2 MONTAJE CHANCADORA 40.80.001.0118 40.80.001.011
NIVEL 4 - TOP SHELL 2 MONTAJE LUBRICACION Y PER40.80.001.0118 40.80.001.011
NIVEL 4 - TOP SHELL 2 CONEXIONADO EQUIPOS 40.80.001.0118 40.80.001.011
NIVEL 4 - TOP SHELL 2 PROTOCOLO EQUIPOS 40.80.001.0118 40.80.001.011
40.80.001.0118
NIVEL 5 - MAIN SHAFT RECEPCION EQUIPOS 40.80.001.0118 40.80.001.011
NIVEL 5 - MAIN SHAFT MONTAJE CHANCADORA 40.80.001.0118 40.80.001.011
NIVEL 5 - MAIN SHAFT MONTAJE LUBRICACION Y PER40.80.001.0118 40.80.001.011
NIVEL 5 - MAIN SHAFT CONEXIONADO EQUIPOS 40.80.001.0118 40.80.001.011
NIVEL 5 - MAIN SHAFT PROTOCOLO EQUIPOS 40.80.001.0118 40.80.001.011
40.80.001.0118
NIVEL 5 - SPIDER 2 RECEPCION EQUIPOS 40.80.001.0118 40.80.001.011
NIVEL 5 - SPIDER 2 MONTAJE CHANCADORA 40.80.001.0118 40.80.001.011
NIVEL 5 - SPIDER 2 MONTAJE LUBRICACION Y PER40.80.001.0118 40.80.001.011
NIVEL 5 - SPIDER 2 CONEXIONADO EQUIPOS 40.80.001.0118 40.80.001.011
NIVEL 5 - SPIDER 2 PROTOCOLO EQUIPOS 40.80.001.0118 40.80.001.011
40.80.001.0119
NIVEL 3 - UNIDAD DE RECEPCION EQUIPOS 40.80.001.0119 40.80.001.0119
NIVEL 3 - UNIDAD DE MONTAJE CHANCADORA 40.80.001.0119 40.80.001.0119
NIVEL 3 - UNIDAD DE MONTAJE LUBRICACION 40.80.001.0119 40.80.001.0119
NIVEL 3 - UNIDAD DE CONEXIONADO EQUIPOS 40.80.001.0119 40.80.001.0119
NIVEL 3 - UNIDAD DE PROTOCOLO EQUIPOS 40.80.001.0119 40.80.001.0119
40.80.001.0120
NIVEL 3 - MOTOR ELE RECEPCION EQUIPOS 40.80.001.0120 40.80.001.0120
NIVEL 3 - MOTOR ELE MONTAJE CHANCADORA 40.80.001.0120 40.80.001.0120
NIVEL 3 - MOTOR ELE MONTAJE LUBRICACION 40.80.001.0120 40.80.001.0120
NIVEL 3 - MOTOR ELE CONEXIONADO EQUIPOS 40.80.001.0120 40.80.001.0120
NIVEL 3 - MOTOR ELE PROTOCOLO EQUIPOS 40.80.001.0120 40.80.001.0120
40.80.001.0121
NIVEL 3 - MOTOR ELE RECEPCION EQUIPOS 40.80.001.0121 40.80.001.0121
NIVEL 3 - MOTOR ELE MONTAJE CHANCADORA 40.80.001.0121 40.80.001.0121
NIVEL 3 - MOTOR ELE MONTAJE LUBRICACION 40.80.001.0121 40.80.001.0121
NIVEL 3 - MOTOR ELE CONEXIONADO EQUIPOS 40.80.001.0121 40.80.001.0121
NIVEL 3 - MOTOR ELE PROTOCOLO EQUIPOS 40.80.001.0121 40.80.001.0121
40.80.001.0122
NIVEL 5 - MOTOR ELE RECEPCION EQUIPOS 40.80.001.0122 40.80.001.0122
NIVEL 5 - MOTOR ELE MONTAJE CHANCADORA 40.80.001.0122 40.80.001.0122
NIVEL 5 - MOTOR ELE MONTAJE LUBRICACION 40.80.001.0122 40.80.001.0122
NIVEL 5 - MOTOR ELE CONEXIONADO EQUIPOS 40.80.001.0122 40.80.001.0122
NIVEL 5 - MOTOR ELE PROTOCOLO EQUIPOS 40.80.001.0122 40.80.001.0122
40.80.001.0123
NIVEL 5 - MOTOR ELE RECEPCION EQUIPOS 40.80.001.0123 40.80.001.0123
NIVEL 5 - MOTOR ELE MONTAJE CHANCADORA 40.80.001.0123 40.80.001.0123
NIVEL 5 - MOTOR ELE MONTAJE LUBRICACION 40.80.001.0123 40.80.001.0123
NIVEL 5 - MOTOR ELE CONEXIONADO EQUIPOS 40.80.001.0123 40.80.001.0123
NIVEL 5 - MOTOR ELE PROTOCOLO EQUIPOS 40.80.001.0123 40.80.001.0123
40.80.001.0124
NIVEL 4 - MOTOR ELEC RECEPCION EQUIPOS 40.80.001.0124 40.80.001.0124
NIVEL 4 - MOTOR ELEC MONTAJE CHANCADORA 40.80.001.0124 40.80.001.0124
NIVEL 4 - MOTOR ELEC MONTAJE LUBRICACION 40.80.001.0124 40.80.001.0124
NIVEL 4 - MOTOR ELEC CONEXIONADO EQUIPOS 40.80.001.0124 40.80.001.0124
NIVEL 4 - MOTOR ELEC PROTOCOLO EQUIPOS 40.80.001.0124 40.80.001.0124
40.80.001.0125
NIVEL 3 - SISTEMA LU RECEPCION EQUIPOS 40.80.001.0125 40.80.001.0125
NIVEL 3 - SISTEMA LU MONTAJE CHANCADORA 40.80.001.0125 40.80.001.0125
NIVEL 3 - SISTEMA LU MONTAJE LUBRICACION 40.80.001.0125 40.80.001.0125
NIVEL 3 - SISTEMA LU CONEXIONADO EQUIPOS 40.80.001.0125 40.80.001.0125
NIVEL 3 - SISTEMA LU PROTOCOLO EQUIPOS 40.80.001.0125 40.80.001.0125
40.80.001.0126
NIVEL 3 - MOTOR ELEC RECEPCION EQUIPOS 40.80.001.0126 40.80.001.0126
NIVEL 3 - MOTOR ELEC MONTAJE CHANCADORA 40.80.001.0126 40.80.001.0126
NIVEL 3 - MOTOR ELEC MONTAJE LUBRICACION 40.80.001.0126 40.80.001.0126
NIVEL 3 - MOTOR ELEC CONEXIONADO EQUIPOS 40.80.001.0126 40.80.001.0126
NIVEL 3 - MOTOR ELEC PROTOCOLO EQUIPOS 40.80.001.0126 40.80.001.0126
40.80.001.0127
NIVEL 4 - MOTOR ELEC RECEPCION EQUIPOS 40.80.001.0127 40.80.001.0127
NIVEL 4 - MOTOR ELEC MONTAJE CHANCADORA 40.80.001.0127 40.80.001.0127
NIVEL 4 - MOTOR ELEC MONTAJE LUBRICACION 40.80.001.0127 40.80.001.0127
NIVEL 4 - MOTOR ELEC CONEXIONADO EQUIPOS 40.80.001.0127 40.80.001.0127
NIVEL 4 - MOTOR ELEC PROTOCOLO EQUIPOS 40.80.001.0127 40.80.001.0127
40.80.001.0128
NIVEL 4 - SISTEMA SE RECEPCION EQUIPOS 40.80.001.0128 40.80.001.0128
NIVEL 4 - SISTEMA SE MONTAJE CHANCADORA 40.80.001.0128 40.80.001.0128
NIVEL 4 - SISTEMA SE MONTAJE LUBRICACION 40.80.001.0128 40.80.001.0128
NIVEL 4 - SISTEMA SE CONEXIONADO EQUIPOS 40.80.001.0128 40.80.001.0128
NIVEL 4 - SISTEMA SE PROTOCOLO EQUIPOS 40.80.001.0128 40.80.001.0128
40.80.001.0129
NIVEL 4 - MOTOR ELEC RECEPCION EQUIPOS 40.80.001.0129 40.80.001.0129
NIVEL 4 - MOTOR ELEC MONTAJE CHANCADORA 40.80.001.0129 40.80.001.0129
NIVEL 4 - MOTOR ELEC MONTAJE LUBRICACION 40.80.001.0129 40.80.001.0129
NIVEL 4 - MOTOR ELEC CONEXIONADO EQUIPOS 40.80.001.0129 40.80.001.0129
NIVEL 4 - MOTOR ELEC PROTOCOLO EQUIPOS 40.80.001.0129 40.80.001.0129
40.80.001.0130
NIVEL 4 - SISTEMA DE RECEPCION EQUIPOS 40.80.001.0130 40.80.001.0130
NIVEL 4 - SISTEMA DE MONTAJE CHANCADORA 40.80.001.0130 40.80.001.0130
NIVEL 4 - SISTEMA DE MONTAJE LUBRICACION 40.80.001.0130 40.80.001.0130
NIVEL 4 - SISTEMA DE CONEXIONADO EQUIPOS 40.80.001.0130 40.80.001.0130
NIVEL 4 - SISTEMA DE PROTOCOLO EQUIPOS 40.80.001.0130 40.80.001.0130
40.80.001.0131
NIVEL 4 - MOTOR ELEC RECEPCION EQUIPOS 40.80.001.0131 40.80.001.0131
NIVEL 4 - MOTOR ELEC MONTAJE CHANCADORA 40.80.001.0131 40.80.001.0131
NIVEL 4 - MOTOR ELEC MONTAJE LUBRICACION 40.80.001.0131 40.80.001.0131
NIVEL 4 - MOTOR ELEC CONEXIONADO EQUIPOS 40.80.001.0131 40.80.001.0131
NIVEL 4 - MOTOR ELEC PROTOCOLO EQUIPOS 40.80.001.0131 40.80.001.0131
40.80.001.0132
NIVEL 4 - MOTOR ELEC RECEPCION EQUIPOS 40.80.001.0132 40.80.001.0132
NIVEL 4 - MOTOR ELEC MONTAJE CHANCADORA 40.80.001.0132 40.80.001.0132
NIVEL 4 - MOTOR ELEC MONTAJE LUBRICACION 40.80.001.0132 40.80.001.0132
NIVEL 4 - MOTOR ELEC CONEXIONADO EQUIPOS 40.80.001.0132 40.80.001.0132
NIVEL 4 - MOTOR ELEC PROTOCOLO EQUIPOS 40.80.001.0132 40.80.001.0132
40.80.001.0133
NIVEL 6 - SISTEMA DE RECEPCION EQUIPOS 40.80.001.0133 40.80.001.0133
NIVEL 6 - SISTEMA DE MONTAJE CHANCADORA 40.80.001.0133 40.80.001.0133
NIVEL 6 - SISTEMA DE MONTAJE LUBRICACION 40.80.001.0133 40.80.001.0133
NIVEL 6 - SISTEMA DE CONEXIONADO EQUIPOS 40.80.001.0133 40.80.001.0133
NIVEL 6 - SISTEMA DE PROTOCOLO EQUIPOS 40.80.001.0133 40.80.001.0133
40.80.001.0134
NIVEL 4 - MOTOR ELEC RECEPCION EQUIPOS 40.80.001.0134 40.80.001.0134
NIVEL 4 - MOTOR ELEC MONTAJE CHANCADORA 40.80.001.0134 40.80.001.0134
NIVEL 4 - MOTOR ELEC MONTAJE LUBRICACION 40.80.001.0134 40.80.001.0134
NIVEL 4 - MOTOR ELEC CONEXIONADO EQUIPOS 40.80.001.0134 40.80.001.0134
NIVEL 4 - MOTOR ELEC PROTOCOLO EQUIPOS 40.80.001.0134 40.80.001.0134
40.80.001.0135
NIVEL 6 - SISTEMA DE RECEPCION EQUIPOS 40.80.001.0135 40.80.001.0135
NIVEL 6 - SISTEMA DE MONTAJE CHANCADORA 40.80.001.0135 40.80.001.0135
NIVEL 6 - SISTEMA DE MONTAJE LUBRICACION 40.80.001.0135 40.80.001.0135
NIVEL 6 - SISTEMA DE CONEXIONADO EQUIPOS 40.80.001.0135 40.80.001.0135
NIVEL 6 - SISTEMA DE PROTOCOLO EQUIPOS 40.80.001.0135 40.80.001.0135
40.80.001.0501
NIVEL 2 - FAJA ALIME RECEPCION EQUIPOS 40.80.001.0501 40.80.001.0501
NIVEL 2 - FAJA ALIME MONTAJE ESTUCTURAS 40.80.001.0501 40.80.001.0501
NIVEL 2 - FAJA ALIME MONTAJE ELEMENTOS MECAN40.80.001.0501 40.80.001.0501
NIVEL 2 - FAJA ALIME MONTAJE CHUTES 40.80.001.0501 40.80.001.0501
NIVEL 2 - FAJA ALIME CONEXIONADO EQUIPOS 40.80.001.0501 40.80.001.0501
NIVEL 2 - FAJA ALIME PROTOCOLO EQUIPOS 40.80.001.0501 40.80.001.0501
40.80.001.0502
NIVEL 1 - UNIDAD HID RECEPCION EQUIPOS 40.80.001.0502 40.80.001.0502
NIVEL 1 - UNIDAD HID MONTAJE ESTUCTURAS 40.80.001.0502 40.80.001.0502
NIVEL 1 - UNIDAD HID MONTAJE ELEMENTOS MECAN40.80.001.0502 40.80.001.0502
NIVEL 1 - UNIDAD HID MONTAJE CHUTES 40.80.001.0502 40.80.001.0502
NIVEL 1 - UNIDAD HID CONEXIONADO EQUIPOS 40.80.001.0502 40.80.001.0502
NIVEL 1 - UNIDAD HID PROTOCOLO EQUIPOS 40.80.001.0502 40.80.001.0502
40.80.001.0503
NIVEL 1 - MOTOR ELE RECEPCION EQUIPOS 40.80.001.0503 40.80.001.0503
NIVEL 1 - MOTOR ELE MONTAJE ESTUCTURAS 40.80.001.0503 40.80.001.0503
NIVEL 1 - MOTOR ELE MONTAJE ELEMENTOS MECAN40.80.001.0503 40.80.001.0503
NIVEL 1 - MOTOR ELE MONTAJE CHUTES 40.80.001.0503 40.80.001.0503
NIVEL 1 - MOTOR ELE CONEXIONADO EQUIPOS 40.80.001.0503 40.80.001.0503
NIVEL 1 - MOTOR ELE PROTOCOLO EQUIPOS 40.80.001.0503 40.80.001.0503
40.80.001.0504
NIVEL 1 - MOTOR ELE RECEPCION EQUIPOS 40.80.001.0504 40.80.001.0504
NIVEL 1 - MOTOR ELE MONTAJE ESTUCTURAS 40.80.001.0504 40.80.001.0504
NIVEL 1 - MOTOR ELE MONTAJE ELEMENTOS MECAN40.80.001.0504 40.80.001.0504
NIVEL 1 - MOTOR ELE MONTAJE CHUTES 40.80.001.0504 40.80.001.0504
NIVEL 1 - MOTOR ELE CONEXIONADO EQUIPOS 40.80.001.0504 40.80.001.0504
NIVEL 1 - MOTOR ELE PROTOCOLO EQUIPOS 40.80.001.0504 40.80.001.0504
40.80.001.0505
NIVEL 1 - MOTOR ELE RECEPCION EQUIPOS 40.80.001.0505 40.80.001.0505
NIVEL 1 - MOTOR ELE MONTAJE ESTUCTURAS 40.80.001.0505 40.80.001.0505
NIVEL 1 - MOTOR ELE MONTAJE ELEMENTOS MECAN40.80.001.0505 40.80.001.0505
NIVEL 1 - MOTOR ELE MONTAJE CHUTES 40.80.001.0505 40.80.001.0505
NIVEL 1 - MOTOR ELE CONEXIONADO EQUIPOS 40.80.001.0505 40.80.001.0505
NIVEL 1 - MOTOR ELE PROTOCOLO EQUIPOS 40.80.001.0505 40.80.001.0505
40.80.001.0506
NIVEL 1 - UNIDAD ENF RECEPCION EQUIPOS 40.80.001.0506 40.80.001.0506
NIVEL 1 - UNIDAD ENF MONTAJE ESTUCTURAS 40.80.001.0506 40.80.001.0506
NIVEL 1 - UNIDAD ENF MONTAJE ELEMENTOS MECAN40.80.001.0506 40.80.001.0506
NIVEL 1 - UNIDAD ENF MONTAJE CHUTES 40.80.001.0506 40.80.001.0506
NIVEL 1 - UNIDAD ENF CONEXIONADO EQUIPOS 40.80.001.0506 40.80.001.0506
NIVEL 1 - UNIDAD ENF PROTOCOLO EQUIPOS 40.80.001.0506 40.80.001.0506
40.80.001.0507
NIVEL 1 - MOTOR ELE RECEPCION EQUIPOS 40.80.001.0507 40.80.001.0507
NIVEL 1 - MOTOR ELE MONTAJE ESTUCTURAS 40.80.001.0507 40.80.001.0507
NIVEL 1 - MOTOR ELE MONTAJE ELEMENTOS MECAN40.80.001.0507 40.80.001.0507
NIVEL 1 - MOTOR ELE MONTAJE CHUTES 40.80.001.0507 40.80.001.0507
NIVEL 1 - MOTOR ELE CONEXIONADO EQUIPOS 40.80.001.0507 40.80.001.0507
NIVEL 1 - MOTOR ELE PROTOCOLO EQUIPOS 40.80.001.0507 40.80.001.0507
40.80.001.0508
NIVEL 1 - MOTOR HID RECEPCION EQUIPOS 40.80.001.0508 40.80.001.0508
NIVEL 1 - MOTOR HID MONTAJE ESTUCTURAS 40.80.001.0508 40.80.001.0508
NIVEL 1 - MOTOR HID MONTAJE ELEMENTOS MECAN40.80.001.0508 40.80.001.0508
NIVEL 1 - MOTOR HID MONTAJE CHUTES 40.80.001.0508 40.80.001.0508
NIVEL 1 - MOTOR HID CONEXIONADO EQUIPOS 40.80.001.0508 40.80.001.0508
NIVEL 1 - MOTOR HID PROTOCOLO EQUIPOS 40.80.001.0508 40.80.001.0508
40.80.001.0509
NIVEL 1 - MOTOR HID RECEPCION EQUIPOS 40.80.001.0509 40.80.001.0509
NIVEL 1 - MOTOR HID MONTAJE ESTUCTURAS 40.80.001.0509 40.80.001.0509
NIVEL 1 - MOTOR HID MONTAJE ELEMENTOS MECAN40.80.001.0509 40.80.001.0509
NIVEL 1 - MOTOR HID MONTAJE CHUTES 40.80.001.0509 40.80.001.0509
NIVEL 1 - MOTOR HID CONEXIONADO EQUIPOS 40.80.001.0509 40.80.001.0509
NIVEL 1 - MOTOR HID PROTOCOLO EQUIPOS 40.80.001.0509 40.80.001.0509
40.80.001.0510
NIVEL 2 - FAJA ALIME RECEPCION EQUIPOS 40.80.001.0510 40.80.001.0510
NIVEL 2 - FAJA ALIME MONTAJE ESTUCTURAS 40.80.001.0510 40.80.001.0510
NIVEL 2 - FAJA ALIME MONTAJE ELEMENTOS MECAN40.80.001.0510 40.80.001.0510
NIVEL 2 - FAJA ALIME MONTAJE CHUTES 40.80.001.0510 40.80.001.0510
NIVEL 2 - FAJA ALIME CONEXIONADO EQUIPOS 40.80.001.0510 40.80.001.0510
NIVEL 2 - FAJA ALIME PROTOCOLO EQUIPOS 40.80.001.0510 40.80.001.0510
40.80.001.0511
NIVEL 1 - UNIDAD HID RECEPCION EQUIPOS 40.80.001.0511 40.80.001.0511
NIVEL 1 - UNIDAD HID MONTAJE ESTUCTURAS 40.80.001.0511 40.80.001.0511
NIVEL 1 - UNIDAD HID MONTAJE ELEMENTOS MECAN40.80.001.0511 40.80.001.0511
NIVEL 1 - UNIDAD HID MONTAJE CHUTES 40.80.001.0511 40.80.001.0511
NIVEL 1 - UNIDAD HID CONEXIONADO EQUIPOS 40.80.001.0511 40.80.001.0511
NIVEL 1 - UNIDAD HID PROTOCOLO EQUIPOS 40.80.001.0511 40.80.001.0511
40.80.001.0512
NIVEL 1 - MOTOR ELE RECEPCION EQUIPOS 40.80.001.0512 40.80.001.0512
NIVEL 1 - MOTOR ELE MONTAJE ESTUCTURAS 40.80.001.0512 40.80.001.0512
NIVEL 1 - MOTOR ELE MONTAJE ELEMENTOS MECAN40.80.001.0512 40.80.001.0512
NIVEL 1 - MOTOR ELE MONTAJE CHUTES 40.80.001.0512 40.80.001.0512
NIVEL 1 - MOTOR ELE CONEXIONADO EQUIPOS 40.80.001.0512 40.80.001.0512
NIVEL 1 - MOTOR ELE PROTOCOLO EQUIPOS 40.80.001.0512 40.80.001.0512
40.80.001.0513
NIVEL 1 - MOTOR ELE RECEPCION EQUIPOS 40.80.001.0513 40.80.001.0513
NIVEL 1 - MOTOR ELE MONTAJE ESTUCTURAS 40.80.001.0513 40.80.001.0513
NIVEL 1 - MOTOR ELE MONTAJE ELEMENTOS MECAN40.80.001.0513 40.80.001.0513
NIVEL 1 - MOTOR ELE MONTAJE CHUTES 40.80.001.0513 40.80.001.0513
NIVEL 1 - MOTOR ELE CONEXIONADO EQUIPOS 40.80.001.0513 40.80.001.0513
NIVEL 1 - MOTOR ELE PROTOCOLO EQUIPOS 40.80.001.0513 40.80.001.0513
40.80.001.0514
NIVEL 1 - MOTOR ELE RECEPCION EQUIPOS 40.80.001.0514 40.80.001.0514
NIVEL 1 - MOTOR ELE MONTAJE ESTUCTURAS 40.80.001.0514 40.80.001.0514
NIVEL 1 - MOTOR ELE MONTAJE ELEMENTOS MECAN40.80.001.0514 40.80.001.0514
NIVEL 1 - MOTOR ELE MONTAJE CHUTES 40.80.001.0514 40.80.001.0514
NIVEL 1 - MOTOR ELE CONEXIONADO EQUIPOS 40.80.001.0514 40.80.001.0514
NIVEL 1 - MOTOR ELE PROTOCOLO EQUIPOS 40.80.001.0514 40.80.001.0514
40.80.001.0515
NIVEL 1 - UNIDAD ENF RECEPCION EQUIPOS 40.80.001.0515 40.80.001.0515
NIVEL 1 - UNIDAD ENF MONTAJE ESTUCTURAS 40.80.001.0515 40.80.001.0515
NIVEL 1 - UNIDAD ENF MONTAJE ELEMENTOS MECAN40.80.001.0515 40.80.001.0515
NIVEL 1 - UNIDAD ENF MONTAJE CHUTES 40.80.001.0515 40.80.001.0515
NIVEL 1 - UNIDAD ENF CONEXIONADO EQUIPOS 40.80.001.0515 40.80.001.0515
NIVEL 1 - UNIDAD ENF PROTOCOLO EQUIPOS 40.80.001.0515 40.80.001.0515
40.80.001.0516
NIVEL 1 - MOTOR HID RECEPCION EQUIPOS 40.80.001.0516 40.80.001.0516
NIVEL 1 - MOTOR HID MONTAJE ESTUCTURAS 40.80.001.0516 40.80.001.0516
NIVEL 1 - MOTOR HID MONTAJE ELEMENTOS MECAN40.80.001.0516 40.80.001.0516
NIVEL 1 - MOTOR HID MONTAJE CHUTES 40.80.001.0516 40.80.001.0516
NIVEL 1 - MOTOR HID CONEXIONADO EQUIPOS 40.80.001.0516 40.80.001.0516
NIVEL 1 - MOTOR HID PROTOCOLO EQUIPOS 40.80.001.0516 40.80.001.0516
40.80.001.0517
NIVEL 1 - MOTOR HID RECEPCION EQUIPOS 40.80.001.0517 40.80.001.0517
NIVEL 1 - MOTOR HID MONTAJE ESTUCTURAS 40.80.001.0517 40.80.001.0517
NIVEL 1 - MOTOR HID MONTAJE ELEMENTOS MECAN40.80.001.0517 40.80.001.0517
NIVEL 1 - MOTOR HID MONTAJE CHUTES 40.80.001.0517 40.80.001.0517
NIVEL 1 - MOTOR HID CONEXIONADO EQUIPOS 40.80.001.0517 40.80.001.0517
NIVEL 1 - MOTOR HID PROTOCOLO EQUIPOS 40.80.001.0517 40.80.001.0517
40.80.001.3101
NIVEL 6 - PUENTE GR RECEPCION 40.80.001.3101 40.80.001.3101
NIVEL 6 - PUENTE GR INSTALACION RIELES 40.80.001.3101 40.80.001.3101
NIVEL 6 - PUENTE GR MONTAJE POLIPLASTOS 40.80.001.3101 40.80.001.3101
NIVEL 6 - PUENTE GR INSTALACION ELECTRIFICACIO40.80.001.3101 40.80.001.3101
NIVEL 6 - PUENTE GR CONEXIONADO EQUIPOS 40.80.001.3101 40.80.001.3101
NIVEL 6 - PUENTE GR PROTOCOLOS 40.80.001.3101 40.80.001.3101
40.80.001.3102
NIVEL 6 - PUENTE GR RECEPCION 40.80.001.3102 40.80.001.3102
NIVEL 6 - PUENTE GR INSTALACION RIELES 40.80.001.3102 40.80.001.3102
NIVEL 6 - PUENTE GR MONTAJE POLIPLASTOS 40.80.001.3102 40.80.001.3102
NIVEL 6 - PUENTE GR INSTALACION ELECTRIFICACIO40.80.001.3102 40.80.001.3102
NIVEL 6 - PUENTE GR CONEXIONADO EQUIPOS 40.80.001.3102 40.80.001.3102
NIVEL 6 - PUENTE GR PROTOCOLOS 40.80.001.3102 40.80.001.3102
40.80.001.3202
NIVEL 1 - POLIPASTO E RECEPCION EQUIPOS 40.80.001.3202 40.80.001.3202
NIVEL 1 - POLIPASTO E MONTAJE POLIPLASTOS 40.80.001.3202 40.80.001.3202
NIVEL 1 - POLIPASTO E CONEXIONADO EQUIPOS 40.80.001.3202 40.80.001.3202
NIVEL 1 - POLIPASTO E PROTOCOLO EQUIPOS 40.80.001.3202 40.80.001.3202
40.80.001.3203
NIVEL 1 - POLIPASTO RECEPCION EQUIPOS 40.80.001.3203 40.80.001.3203
NIVEL 1 - POLIPASTO MONTAJE POLIPLASTOS 40.80.001.3203 40.80.001.3203
NIVEL 1 - POLIPASTO CONEXIONADO EQUIPOS 40.80.001.3203 40.80.001.3203
NIVEL 1 - POLIPASTO PROTOCOLO EQUIPOS 40.80.001.3203 40.80.001.3203
40.80.001.3207
NIVEL 2 - POLIPASTO RECEPCION EQUIPOS 40.80.001.3207 40.80.001.3207
NIVEL 2 - POLIPASTO MONTAJE POLIPLASTOS 40.80.001.3207 40.80.001.3207
NIVEL 2 - POLIPASTO CONEXIONADO EQUIPOS 40.80.001.3207 40.80.001.3207
NIVEL 2 - POLIPASTO PROTOCOLO EQUIPOS 40.80.001.3207 40.80.001.3207
40.80.001.3401
NIVEL 6 - ELEVADOR E RECEPCION EQUIPOS 40.80.001.3401 40.80.001.3401
NIVEL 6 - ELEVADOR E MONTAJE EQUIPOS 40.80.001.3401 40.80.001.3401
NIVEL 6 - ELEVADOR E MONTAJE EQUIPOS 40.80.001.3401 40.80.001.3401
NIVEL 6 - ELEVADOR E CONEXIONADO EQUIPOS 40.80.001.3401 40.80.001.3401
NIVEL 6 - ELEVADOR E PROTOCOLO EQUIPOS 40.80.001.3401 40.80.001.3401
40.80.001.3501
NIVEL 1 - SISTEMA CO RECEPCION EQUIPOS 40.80.001.3501 40.80.001.3501
NIVEL 1 - SISTEMA CO MONTAJE COLECTOR POLVO 40.80.001.3501 40.80.001.3501
NIVEL 1 - SISTEMA CO MONTAJE EQUIPOS 40.80.001.3501 40.80.001.3501
NIVEL 1 - SISTEMA CO CONEXIONADO EQUIPOS 40.80.001.3501 40.80.001.3501
NIVEL 1 - SISTEMA CO PROTOCOLO EQUIPOS 40.80.001.3501 40.80.001.3501
40.80.001.3502
NIVEL 1 - DUCTOS SI RECEPCION EQUIPOS 40.80.001.3502 40.80.001.3502
NIVEL 1 - DUCTOS SI MONTAJE COLECTOR POLVO 40.80.001.3502 40.80.001.3502
NIVEL 1 - DUCTOS SI MONTAJE EQUIPOS 40.80.001.3502 40.80.001.3502
NIVEL 1 - DUCTOS SI CONEXIONADO EQUIPOS 40.80.001.3502 40.80.001.3502
NIVEL 1 - DUCTOS SI PROTOCOLO EQUIPOS 40.80.001.3502 40.80.001.3502
40.80.001.3503
NIVEL 1 - VENTILADO RECEPCION EQUIPOS 40.80.001.3503 40.80.001.3503
NIVEL 1 - VENTILADO MONTAJE COLECTOR POLVO 40.80.001.3503 40.80.001.3503
NIVEL 1 - VENTILADO MONTAJE EQUIPOS 40.80.001.3503 40.80.001.3503
NIVEL 1 - VENTILADO CONEXIONADO EQUIPOS 40.80.001.3503 40.80.001.3503
NIVEL 1 - VENTILADO PROTOCOLO EQUIPOS 40.80.001.3503 40.80.001.3503
40.80.001.3504
NIVEL 1 - MOTOR ELEC RECEPCION EQUIPOS 40.80.001.3504 40.80.001.3504
NIVEL 1 - MOTOR ELEC MONTAJE COLECTOR POLVO 40.80.001.3504 40.80.001.3504
NIVEL 1 - MOTOR ELEC MONTAJE EQUIPOS 40.80.001.3504 40.80.001.3504
NIVEL 1 - MOTOR ELEC CONEXIONADO EQUIPOS 40.80.001.3504 40.80.001.3504
NIVEL 1 - MOTOR ELEC PROTOCOLO EQUIPOS 40.80.001.3504 40.80.001.3504
40.80.001.3505
NIVEL 1 - VALVULA R RECEPCION EQUIPOS 40.80.001.3505 40.80.001.3505
NIVEL 1 - VALVULA R MONTAJE COLECTOR POLVO 40.80.001.3505 40.80.001.3505
NIVEL 1 - VALVULA R MONTAJE EQUIPOS 40.80.001.3505 40.80.001.3505
NIVEL 1 - VALVULA R CONEXIONADO EQUIPOS 40.80.001.3505 40.80.001.3505
NIVEL 1 - VALVULA R PROTOCOLO EQUIPOS 40.80.001.3505 40.80.001.3505
40.80.001.3506
NIVEL 1 - MOTOR ELE RECEPCION EQUIPOS 40.80.001.3506 40.80.001.3506
NIVEL 1 - MOTOR ELE MONTAJE COLECTOR POLVO 40.80.001.3506 40.80.001.3506
NIVEL 1 - MOTOR ELE MONTAJE EQUIPOS 40.80.001.3506 40.80.001.3506
NIVEL 1 - MOTOR ELE CONEXIONADO EQUIPOS 40.80.001.3506 40.80.001.3506
NIVEL 1 - MOTOR ELE PROTOCOLO EQUIPOS 40.80.001.3506 40.80.001.3506
40.80.001.3507
NIVEL 1 - PRIMARY CR RECEPCION EQUIPOS 40.80.001.3507 40.80.001.3507
NIVEL 1 - PRIMARY CR MONTAJE COLECTOR POLVO 40.80.001.3507 40.80.001.3507
NIVEL 1 - PRIMARY CR MONTAJE EQUIPOS 40.80.001.3507 40.80.001.3507
NIVEL 1 - PRIMARY CR CONEXIONADO EQUIPOS 40.80.001.3507 40.80.001.3507
NIVEL 1 - PRIMARY CR PROTOCOLO EQUIPOS 40.80.001.3507 40.80.001.3507
40.80.001.3508
NIVEL 1 - PRIMARY C RECEPCION EQUIPOS 40.80.001.3508 40.80.001.3508
NIVEL 1 - PRIMARY C MONTAJE COLECTOR POLVO 40.80.001.3508 40.80.001.3508
NIVEL 1 - PRIMARY C MONTAJE EQUIPOS 40.80.001.3508 40.80.001.3508
NIVEL 1 - PRIMARY C CONEXIONADO EQUIPOS 40.80.001.3508 40.80.001.3508
NIVEL 1 - PRIMARY C PROTOCOLO EQUIPOS 40.80.001.3508 40.80.001.3508
40.80.001.3509
NIVEL 1 - PRIMARY CR RECEPCION EQUIPOS 40.80.001.3509 40.80.001.3509
NIVEL 1 - PRIMARY CR MONTAJE COLECTOR POLVO 40.80.001.3509 40.80.001.3509
NIVEL 1 - PRIMARY CR MONTAJE EQUIPOS 40.80.001.3509 40.80.001.3509
NIVEL 1 - PRIMARY CR CONEXIONADO EQUIPOS 40.80.001.3509 40.80.001.3509
NIVEL 1 - PRIMARY CR PROTOCOLO EQUIPOS 40.80.001.3509 40.80.001.3509
40.80.001.3510
NIVEL 1 - PRIMARY CR RECEPCION EQUIPOS 40.80.001.3510 40.80.001.3510
NIVEL 1 - PRIMARY CR MONTAJE COLECTOR POLVO 40.80.001.3510 40.80.001.3510
NIVEL 1 - PRIMARY CR MONTAJE EQUIPOS 40.80.001.3510 40.80.001.3510
NIVEL 1 - PRIMARY CR CONEXIONADO EQUIPOS 40.80.001.3510 40.80.001.3510
NIVEL 1 - PRIMARY CR PROTOCOLO EQUIPOS 40.80.001.3510 40.80.001.3510
40.80.001.3511
NIVEL 1 - PRIMARY CR RECEPCION EQUIPOS 40.80.001.3511 40.80.001.3511
NIVEL 1 - PRIMARY CR MONTAJE COLECTOR POLVO 40.80.001.3511 40.80.001.3511
NIVEL 1 - PRIMARY CR MONTAJE EQUIPOS 40.80.001.3511 40.80.001.3511
NIVEL 1 - PRIMARY CR CONEXIONADO EQUIPOS 40.80.001.3511 40.80.001.3511
NIVEL 1 - PRIMARY CR PROTOCOLO EQUIPOS 40.80.001.3511 40.80.001.3511
40.80.001.3512
NIVEL 1 - PRIMARY CR RECEPCION EQUIPOS 40.80.001.3512 40.80.001.3512
NIVEL 1 - PRIMARY CR MONTAJE COLECTOR POLVO 40.80.001.3512 40.80.001.3512
NIVEL 1 - PRIMARY CR MONTAJE EQUIPOS 40.80.001.3512 40.80.001.3512
NIVEL 1 - PRIMARY CR CONEXIONADO EQUIPOS 40.80.001.3512 40.80.001.3512
NIVEL 1 - PRIMARY CR PROTOCOLO EQUIPOS 40.80.001.3512 40.80.001.3512
40.80.001.3513
NIVEL 1 - PRIMARY CR RECEPCION EQUIPOS 40.80.001.3513 40.80.001.3513
NIVEL 1 - PRIMARY CR MONTAJE COLECTOR POLVO 40.80.001.3513 40.80.001.3513
NIVEL 1 - PRIMARY CR MONTAJE EQUIPOS 40.80.001.3513 40.80.001.3513
NIVEL 1 - PRIMARY CR CONEXIONADO EQUIPOS 40.80.001.3513 40.80.001.3513
NIVEL 1 - PRIMARY CR PROTOCOLO EQUIPOS 40.80.001.3513 40.80.001.3513
40.80.001.3514
NIVEL 1 - PRIMARY CR RECEPCION EQUIPOS 40.80.001.3514 40.80.001.3514
NIVEL 1 - PRIMARY CR MONTAJE COLECTOR POLVO 40.80.001.3514 40.80.001.3514
NIVEL 1 - PRIMARY CR MONTAJE EQUIPOS 40.80.001.3514 40.80.001.3514
NIVEL 1 - PRIMARY CR CONEXIONADO EQUIPOS 40.80.001.3514 40.80.001.3514
NIVEL 1 - PRIMARY CR PROTOCOLO EQUIPOS 40.80.001.3514 40.80.001.3514
40.80.001.3515
NIVEL 1 - PRIMARY CR RECEPCION EQUIPOS 40.80.001.3515 40.80.001.3515
NIVEL 1 - PRIMARY CR MONTAJE COLECTOR POLVO 40.80.001.3515 40.80.001.3515
NIVEL 1 - PRIMARY CR MONTAJE EQUIPOS 40.80.001.3515 40.80.001.3515
NIVEL 1 - PRIMARY CR CONEXIONADO EQUIPOS 40.80.001.3515 40.80.001.3515
NIVEL 1 - PRIMARY CR PROTOCOLO EQUIPOS 40.80.001.3515 40.80.001.3515
40.80.001.3901
NIVEL 2 - COMPUERTA RECEPCION EQUIPOS 40.80.001.3901 40.80.001.3901
NIVEL 2 - COMPUERTA MONTAJE EQUIPOS 40.80.001.3901 40.80.001.3901
NIVEL 2 - COMPUERTA CONEXIONADO EQUIPOS 40.80.001.3901 40.80.001.3901
NIVEL 2 - COMPUERTA PROTOCOLO EQUIPOS 40.80.001.3901 40.80.001.3901
40.80.001.3902
NIVEL 2 - UNIDAD HI RECEPCION EQUIPOS 40.80.001.3902 40.80.001.3902
NIVEL 2 - UNIDAD HI MONTAJE EQUIPOS 40.80.001.3902 40.80.001.3902
NIVEL 2 - UNIDAD HI CONEXIONADO EQUIPOS 40.80.001.3902 40.80.001.3902
NIVEL 2 - UNIDAD HI PROTOCOLO EQUIPOS 40.80.001.3902 40.80.001.3902
40.80.001.3903
NIVEL 2 - COMPUERTA RECEPCION EQUIPOS 40.80.001.3903 40.80.001.3903
NIVEL 2 - COMPUERTA MONTAJE EQUIPOS 40.80.001.3903 40.80.001.3903
NIVEL 2 - COMPUERTA CONEXIONADO EQUIPOS 40.80.001.3903 40.80.001.3903
NIVEL 2 - COMPUERTA PROTOCOLO EQUIPOS 40.80.001.3903 40.80.001.3903
40.80.001.3904
NIVEL 2 - CARRO MONORECEPCION EQUIPOS 40.80.001.3904 40.80.001.3904
NIVEL 2 - CARRO MONOMONTAJE EQUIPOS 40.80.001.3904 40.80.001.3904
NIVEL 2 - CARRO MONOCONEXIONADO EQUIPOS 40.80.001.3904 40.80.001.3904
NIVEL 2 - CARRO MONOPROTOCOLO EQUIPOS 40.80.001.3904 40.80.001.3904
40.80.001.3905
NIVEL 2 - CARRO MONORECEPCION EQUIPOS 40.80.001.3905 40.80.001.3905
NIVEL 2 - CARRO MONOMONTAJE EQUIPOS 40.80.001.3905 40.80.001.3905
NIVEL 2 - CARRO MONOCONEXIONADO EQUIPOS 40.80.001.3905 40.80.001.3905
NIVEL 2 - CARRO MONOPROTOCOLO EQUIPOS 40.80.001.3905 40.80.001.3905
40.80.001.3906
NIVEL 2 - CARRO MONORECEPCION EQUIPOS 40.80.001.3906 40.80.001.3906
NIVEL 2 - CARRO MONOMONTAJE EQUIPOS 40.80.001.3906 40.80.001.3906
NIVEL 2 - CARRO MONOCONEXIONADO EQUIPOS 40.80.001.3906 40.80.001.3906
NIVEL 2 - CARRO MONOPROTOCOLO EQUIPOS 40.80.001.3906 40.80.001.3906
40.80.001.3907
NIVEL 2 - CARRO MONORECEPCION EQUIPOS 40.80.001.3907 40.80.001.3907
NIVEL 2 - CARRO MONOMONTAJE EQUIPOS 40.80.001.3907 40.80.001.3907
NIVEL 2 - CARRO MONOCONEXIONADO EQUIPOS 40.80.001.3907 40.80.001.3907
NIVEL 2 - CARRO MONOPROTOCOLO EQUIPOS 40.80.001.3907 40.80.001.3907
40.80.001.4001
NIVEL 2 - MAGNETO F RECEPCION EQUIPOS 40.80.001.4001 40.80.001.4001
NIVEL 2 - MAGNETO F MONTAJE EQUIPOS 40.80.001.4001 40.80.001.4001
NIVEL 2 - MAGNETO F CONEXIONADO EQUIPOS 40.80.001.4001 40.80.001.4001
NIVEL 2 - MAGNETO F PROTOCOLO EQUIPOS 40.80.001.4001 40.80.001.4001
40.80.001.4002
NIVEL 2 - PANEL DE C RECEPCION EQUIPOS 40.80.001.4002 40.80.001.4002
NIVEL 2 - PANEL DE C MONTAJE EQUIPOS 40.80.001.4002 40.80.001.4002
NIVEL 2 - PANEL DE C CONEXIONADO EQUIPOS 40.80.001.4002 40.80.001.4002
NIVEL 2 - PANEL DE C PROTOCOLO EQUIPOS 40.80.001.4002 40.80.001.4002
40.80.001.4003
NIVEL 2 - CARRO MAG RECEPCION EQUIPOS 40.80.001.4003 40.80.001.4003
NIVEL 2 - CARRO MAG MONTAJE EQUIPOS 40.80.001.4003 40.80.001.4003
NIVEL 2 - CARRO MAG CONEXIONADO EQUIPOS 40.80.001.4003 40.80.001.4003
NIVEL 2 - CARRO MAG PROTOCOLO EQUIPOS 40.80.001.4003 40.80.001.4003
40.80.001.4004
NIVEL 2 - UNIDAD DE RECEPCION EQUIPOS 40.80.001.4004 40.80.001.4004
NIVEL 2 - UNIDAD DE MONTAJE EQUIPOS 40.80.001.4004 40.80.001.4004
NIVEL 2 - UNIDAD DE CONEXIONADO EQUIPOS 40.80.001.4004 40.80.001.4004
NIVEL 2 - UNIDAD DE PROTOCOLO EQUIPOS 40.80.001.4004 40.80.001.4004
40.80.001.4005
NIVEL 2 - MAGNETO F RECEPCION EQUIPOS 40.80.001.4005 40.80.001.4005
NIVEL 2 - MAGNETO F MONTAJE EQUIPOS 40.80.001.4005 40.80.001.4005
NIVEL 2 - MAGNETO F CONEXIONADO EQUIPOS 40.80.001.4005 40.80.001.4005
NIVEL 2 - MAGNETO F PROTOCOLO EQUIPOS 40.80.001.4005 40.80.001.4005
40.80.001.4006
NIVEL 2 - PANEL DE C RECEPCION EQUIPOS 40.80.001.4006 40.80.001.4006
NIVEL 2 - PANEL DE C MONTAJE EQUIPOS 40.80.001.4006 40.80.001.4006
NIVEL 2 - PANEL DE C CONEXIONADO EQUIPOS 40.80.001.4006 40.80.001.4006
NIVEL 2 - PANEL DE C PROTOCOLO EQUIPOS 40.80.001.4006 40.80.001.4006
40.80.001.4007
NIVEL 2 - CARRO MAG RECEPCION EQUIPOS 40.80.001.4007 40.80.001.4007
NIVEL 2 - CARRO MAG MONTAJE EQUIPOS 40.80.001.4007 40.80.001.4007
NIVEL 2 - CARRO MAG CONEXIONADO EQUIPOS 40.80.001.4007 40.80.001.4007
NIVEL 2 - CARRO MAG PROTOCOLO EQUIPOS 40.80.001.4007 40.80.001.4007
40.80.001.4901
NIVEL 6 - PICA ROCA RECEPCION EQUIPOS 40.80.001.4901 40.80.001.4901
NIVEL 6 - PICA ROCA MONTAJE EQUIPOS 40.80.001.4901 40.80.001.4901
NIVEL 6 - PICA ROCA CONEXIONADO EQUIPOS 40.80.001.4901 40.80.001.4901
NIVEL 6 - PICA ROCA PROTOCOLO EQUIPOS 40.80.001.4901 40.80.001.4901
40.80.001.4902
NIVEL 6 - UNIDAD HIDRRECEPCION EQUIPOS 40.80.001.4902 40.80.001.4902
NIVEL 6 - UNIDAD HIDRMONTAJE EQUIPOS 40.80.001.4902 40.80.001.4902
NIVEL 6 - UNIDAD HIDRCONEXIONADO EQUIPOS 40.80.001.4902 40.80.001.4902
NIVEL 6 - UNIDAD HIDRPROTOCOLO EQUIPOS 40.80.001.4902 40.80.001.4902
40.80.001.4903
NIVEL 6 - MOTOR ELEC RECEPCION EQUIPOS 40.80.001.4903 40.80.001.4903
NIVEL 6 - MOTOR ELEC MONTAJE EQUIPOS 40.80.001.4903 40.80.001.4903
NIVEL 6 - MOTOR ELEC CONEXIONADO EQUIPOS 40.80.001.4903 40.80.001.4903
NIVEL 6 - MOTOR ELEC PROTOCOLO EQUIPOS 40.80.001.4903 40.80.001.4903
40.80.001.4904
NIVEL 6 - PICA ROCA RECEPCION EQUIPOS 40.80.001.4904 40.80.001.4904
NIVEL 6 - PICA ROCA MONTAJE EQUIPOS 40.80.001.4904 40.80.001.4904
NIVEL 6 - PICA ROCA CONEXIONADO EQUIPOS 40.80.001.4904 40.80.001.4904
NIVEL 6 - PICA ROCA PROTOCOLO EQUIPOS 40.80.001.4904 40.80.001.4904
40.80.001.4905
NIVEL 6 - UNIDAD HIDRRECEPCION EQUIPOS 40.80.001.4905 40.80.001.4905
NIVEL 6 - UNIDAD HIDRMONTAJE EQUIPOS 40.80.001.4905 40.80.001.4905
NIVEL 6 - UNIDAD HIDRCONEXIONADO EQUIPOS 40.80.001.4905 40.80.001.4905
NIVEL 6 - UNIDAD HIDRPROTOCOLO EQUIPOS 40.80.001.4905 40.80.001.4905
40.80.001.4906
NIVEL 6 - MOTOR ELEC RECEPCION EQUIPOS 40.80.001.4906 40.80.001.4906
NIVEL 6 - MOTOR ELEC MONTAJE EQUIPOS 40.80.001.4906 40.80.001.4906
NIVEL 6 - MOTOR ELEC CONEXIONADO EQUIPOS 40.80.001.4906 40.80.001.4906
NIVEL 6 - MOTOR ELEC PROTOCOLO EQUIPOS 40.80.001.4906 40.80.001.4906

51.20.001.0002
FABRICACION DE TUBERFABRICACION DE TUBERIAS R51.20.001.0002 51.20.001.000
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0002 51.20.001.000
51.20.001.0003
FABRICACION DE TUBERFABRICACION DE TUBERIAS R51.20.001.0003 51.20.001.000
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0003 51.20.001.000
51.20.001.0004
FABRICACION DE TUBERFABRICACION DE TUBERIAS R51.20.001.0004 51.20.001.000
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0004 51.20.001.000
51.20.001.0005
FABRICACION DE TUBERFABRICACION DE TUBERIAS R51.20.001.0005 51.20.001.000
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0005 51.20.001.000
51.20.001.0008
INSTALACION DE TUBERFABRICACION DE TUBERIAS R51.20.001.0008 51.20.001.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0008 51.20.001.000
51.20.001.0009
INSTALACION DE TUBERFABRICACION DE TUBERIAS R51.20.001.0009 51.20.001.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0009 51.20.001.000
51.20.001.0010
INSTALACION DE TUBERFABRICACION DE TUBERIAS R51.20.001.0010 51.20.001.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0010 51.20.001.001
51.20.001.0011
INSTALACION DE TUBERFABRICACION DE TUBERIAS R51.20.001.0011 51.20.001.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0011 51.20.001.001
51.20.002.0001
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0001 51.20.002.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0001 51.20.002.0001
51.20.002.0002
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0002 51.20.002.0002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0002 51.20.002.0002
51.20.002.0003
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0003 51.20.002.0003
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0003 51.20.002.0003
51.20.002.0004
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0004 51.20.002.0004
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0004 51.20.002.0004
51.20.002.0005
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0005 51.20.002.0005
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0005 51.20.002.0005
51.20.002.0006
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0006 51.20.002.0006
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0006 51.20.002.0006
51.20.002.0007
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0007 51.20.002.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0007 51.20.002.0007
51.20.002.0008
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0008 51.20.002.0008
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0008 51.20.002.0008
51.20.002.0011
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0011 51.20.002.0011
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0011 51.20.002.0011
51.20.002.0012
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0012 51.20.002.0012
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0012 51.20.002.0012
51.20.002.0013
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0013 51.20.002.0013
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0013 51.20.002.0013
51.20.002.0014
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0014 51.20.002.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0014 51.20.002.0014
51.20.002.0015
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0015 51.20.002.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0015 51.20.002.0015
51.20.002.0016
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0016 51.20.002.0016
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0016 51.20.002.0016
51.20.002.0017
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0017 51.20.002.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0017 51.20.002.0017
51.20.002.0018
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0018 51.20.002.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0018 51.20.002.0018
51.20.002.0019
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0019 51.20.002.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0019 51.20.002.0019
51.20.002.0021
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0021 51.20.002.0021
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0021 51.20.002.0021
51.20.002.0022
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0022 51.20.002.0022
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0022 51.20.002.0022
51.20.002.0023
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0023 51.20.002.0023
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0023 51.20.002.0023
51.20.002.0024
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0024 51.20.002.0024
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0024 51.20.002.0024
51.20.002.0026
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0026 51.20.002.0026
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0026 51.20.002.0026
51.20.002.0027
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0027 51.20.002.0027
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0027 51.20.002.0027
51.20.002.0028
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0028 51.20.002.0028
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0028 51.20.002.0028
51.20.002.0029
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0029 51.20.002.0029
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0029 51.20.002.0029
51.20.002.0030
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0030 51.20.002.0030
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0030 51.20.002.0030
51.20.002.0031
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0031 51.20.002.0031
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0031 51.20.002.0031
51.20.002.0032
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0032 51.20.002.003
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0032 51.20.002.0032
51.20.002.0033
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0033 51.20.002.003
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0033 51.20.002.0033
51.20.002.0034
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0034 51.20.002.0034
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0034 51.20.002.0034
51.20.002.0035
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0035 51.20.002.0035
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0035 51.20.002.0035
51.20.002.0036
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0036 51.20.002.0036
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0036 51.20.002.0036
51.20.002.0037
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0037 51.20.002.0037
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0037 51.20.002.0037
51.20.002.0038
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0038 51.20.002.0038
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0038 51.20.002.0038
51.20.002.0039
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0039 51.20.002.0039
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0039 51.20.002.0039
51.20.002.0040
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0040 51.20.002.0040
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0040 51.20.002.0040
51.20.002.0041
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0041 51.20.002.0041
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0041 51.20.002.0041
51.20.002.0042
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0042 51.20.002.0042
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0042 51.20.002.0042
51.20.002.0043
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0043 51.20.002.0043
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0043 51.20.002.0043
51.20.002.0044
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0044 51.20.002.004
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0044 51.20.002.0044
51.20.002.0046
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0046 51.20.002.004
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0046 51.20.002.0046
51.30.001.0001
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0001 51.30.001.0001
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0001 51.30.001.0001
51.30.001.0003
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0003 51.30.001.0003
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0003 51.30.001.0003
51.30.001.0006
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0006 51.30.001.0006
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0006 51.30.001.0006
51.30.001.0007
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0007 51.30.001.0007
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0007 51.30.001.0007
51.30.001.0008
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0008 51.30.001.000
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0008 51.30.001.0008
51.30.001.0009
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0009 51.30.001.000
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0009 51.30.001.0009
51.30.001.0010
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0010 51.30.001.001
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0010 51.30.001.001
51.30.001.0011
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0011 51.30.001.0011
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0011 51.30.001.0011
51.30.001.0014
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0014 51.30.001.0014
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0014 51.30.001.0014
51.30.001.0015
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0015 51.30.001.001
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0015 51.30.001.0015
51.30.001.0016
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0016 51.30.001.001
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0016 51.30.001.001
51.40.001.0001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0001 51.40.001.0001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0001 51.40.001.0001
51.40.001.0002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0002 51.40.001.0002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0002 51.40.001.0002
51.40.001.0004
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0004 51.40.001.0004
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0004 51.40.001.0004
51.40.001.0005
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0005 51.40.001.0005
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0005 51.40.001.0005
51.40.001.0007
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0007 51.40.001.0007
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0007 51.40.001.0007
51.40.001.0014
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0014 51.40.001.0014
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0014 51.40.001.0014
51.40.001.0015
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0015 51.40.001.0015
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0015 51.40.001.0015
51.40.001.0016
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0016 51.40.001.0016
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0016 51.40.001.0016
51.40.001.0017
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0017 51.40.001.0017
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0017 51.40.001.0017
51.40.001.0018
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0018 51.40.001.0018
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0018 51.40.001.0018
51.40.001.0021
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0021 51.40.001.0021
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0021 51.40.001.0021
51.40.001.0022
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0022 51.40.001.0022
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0022 51.40.001.0022
51.40.001.0023
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0023 51.40.001.0023
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0023 51.40.001.0023
51.40.001.0027
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0027 51.40.001.0027
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0027 51.40.001.0027
51.40.001.0028
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0028 51.40.001.0028
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0028 51.40.001.0028
51.40.001.0029
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0029 51.40.001.0029
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0029 51.40.001.0029
51.40.001.0030
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0030 51.40.001.0030
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0030 51.40.001.0030
51.40.001.0031
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0031 51.40.001.0031
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0031 51.40.001.0031
51.40.001.0032
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0032 51.40.001.0032
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0032 51.40.001.0032
51.40.007.0002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0002 51.40.007.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0002 51.40.007.000
51.40.007.0003
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0003 51.40.007.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0003 51.40.007.000
51.40.007.0004
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0004 51.40.007.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0004 51.40.007.000
51.40.007.0005
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0005 51.40.007.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0005 51.40.007.000
51.40.007.0006
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0006 51.40.007.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0006 51.40.007.000
51.40.007.0007
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0007 51.40.007.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0007 51.40.007.000
51.40.007.0008
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0008 51.40.007.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0008 51.40.007.000
51.40.007.0009
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0009 51.40.007.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0009 51.40.007.000
51.40.007.0011
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0011 51.40.007.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0011 51.40.007.001
51.40.007.0012
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0012 51.40.007.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0012 51.40.007.001
51.40.007.0018
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0018 51.40.007.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0018 51.40.007.001
51.40.007.0019
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0019 51.40.007.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0019 51.40.007.001
51.40.007.0024
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0024 51.40.007.002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0024 51.40.007.002
51.60.101.0002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0002 51.60.101.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0002 51.60.101.000
51.60.101.0004
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0004 51.60.101.0004
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0004 51.60.101.0004
51.60.101.0005
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0005 51.60.101.0005
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0005 51.60.101.0005
51.60.101.0006
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0006 51.60.101.0006
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0006 51.60.101.0006
51.60.101.0007
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0007 51.60.101.0007
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0007 51.60.101.0007
51.60.101.0008
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0008 51.60.101.0008
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0008 51.60.101.0008
51.60.101.0009
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0009 51.60.101.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0009 51.60.101.000
51.60.101.0010
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0010 51.60.101.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0010 51.60.101.0010
51.60.101.0011
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0011 51.60.101.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0011 51.60.101.001
51.60.101.0012
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0012 51.60.101.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0012 51.60.101.001
51.60.101.0013
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0013 51.60.101.0013
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0013 51.60.101.0013
51.60.101.0014
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0014 51.60.101.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0014 51.60.101.0014
51.60.101.0015
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0015 51.60.101.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0015 51.60.101.0015
51.60.101.0016
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0016 51.60.101.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0016 51.60.101.0016
51.60.101.0017
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0017 51.60.101.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0017 51.60.101.0017
51.60.101.0018
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0018 51.60.101.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0018 51.60.101.0018
51.60.101.0019
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0019 51.60.101.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0019 51.60.101.0019
51.60.101.0020
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0020 51.60.101.002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0020 51.60.101.0020
51.60.101.0021
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0021 51.60.101.002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0021 51.60.101.0021
51.60.101.0022
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0022 51.60.101.002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0022 51.60.101.0022
51.60.101.0023
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0023 51.60.101.002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0023 51.60.101.0023
52.20.001.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0002 52.20.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0002 52.20.001.000
52.20.001.0003
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0003 52.20.001.0003
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0003 52.20.001.0003
52.20.001.0004
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0004 52.20.001.0004
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0004 52.20.001.0004
52.20.001.0005
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0005 52.20.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0005 52.20.001.0005
52.20.001.0006
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0006 52.20.001.0006
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0006 52.20.001.0006
52.20.001.0007
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0007 52.20.001.0007
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0007 52.20.001.0007
52.20.001.0008
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0008 52.20.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0008 52.20.001.0008
52.20.001.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0009 52.20.001.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0009 52.20.001.0009
52.20.001.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0012 52.20.001.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0012 52.20.001.0012
52.20.001.0013
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0013 52.20.001.0013
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0013 52.20.001.0013
52.20.001.0019
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0019 52.20.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0019 52.20.001.001
52.20.001.0020
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0020 52.20.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0020 52.20.001.002
52.20.001.0025
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0025 52.20.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0025 52.20.001.002
52.20.003.0001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0001 52.20.003.0001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0001 52.20.003.0001
52.20.003.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0002 52.20.003.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0002 52.20.003.0002
52.20.003.0003
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0003 52.20.003.0003
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0003 52.20.003.0003
52.20.003.0004
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0004 52.20.003.0004
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0004 52.20.003.0004
52.20.003.0005
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0005 52.20.003.0005
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0005 52.20.003.0005
52.20.003.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0009 52.20.003.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0009 52.20.003.0009
52.20.003.0010
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0010 52.20.003.0010
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0010 52.20.003.0010
52.20.003.0011
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0011 52.20.003.0011
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0011 52.20.003.0011
52.20.003.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0012 52.20.003.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0012 52.20.003.0012
52.20.003.0013
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0013 52.20.003.0013
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0013 52.20.003.0013
52.20.003.0017
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0017 52.20.003.0017
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0017 52.20.003.0017
52.20.003.0019
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0019 52.20.003.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0019 52.20.003.0019
52.20.003.0020
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0020 52.20.003.0020
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0020 52.20.003.0020
52.20.003.0021
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0021 52.20.003.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0021 52.20.003.0021
52.20.003.0022
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0022 52.20.003.0022
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0022 52.20.003.0022
52.20.003.0026
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0026 52.20.003.0026
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0026 52.20.003.0026
52.20.003.0027
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0027 52.20.003.0027
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0027 52.20.003.0027
52.20.003.0028
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0028 52.20.003.0028
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0028 52.20.003.0028
52.20.003.0029
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0029 52.20.003.0029
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0029 52.20.003.0029
52.20.003.0030
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0030 52.20.003.0030
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0030 52.20.003.0030
52.20.003.0031
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0031 52.20.003.003
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0031 52.20.003.0031
52.20.003.0032
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0032 52.20.003.0032
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0032 52.20.003.0032
52.20.003.0033
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0033 52.20.003.0033
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0033 52.20.003.0033
52.20.003.0034
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0034 52.20.003.0034
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0034 52.20.003.0034
52.20.003.0035
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0035 52.20.003.0035
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0035 52.20.003.0035
52.20.003.0042
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0042 52.20.003.0042
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0042 52.20.003.0042
52.20.003.0044
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0044 52.20.003.0044
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0044 52.20.003.0044
52.20.003.0045
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0045 52.20.003.0045
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0045 52.20.003.0045
52.20.003.0046
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0046 52.20.003.0046
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0046 52.20.003.0046
52.20.003.0047
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0047 52.20.003.0047
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0047 52.20.003.0047
52.20.003.0048
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0048 52.20.003.0048
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0048 52.20.003.0048
52.20.003.0050
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0050 52.20.003.0050
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0050 52.20.003.0050
52.20.003.0051
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0051 52.20.003.0051
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0051 52.20.003.0051
52.20.003.0053
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0053 52.20.003.0053
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0053 52.20.003.0053
52.20.003.0054
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0054 52.20.003.0054
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0054 52.20.003.0054
52.20.003.0055
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0055 52.20.003.0055
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0055 52.20.003.0055
52.20.003.0056
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0056 52.20.003.0056
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0056 52.20.003.0056
52.20.003.0060
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0060 52.20.003.0060
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0060 52.20.003.0060
52.20.003.0061
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0061 52.20.003.006
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0061 52.20.003.0061
52.20.003.0062
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0062 52.20.003.006
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0062 52.20.003.0062
52.20.003.0065
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0065 52.20.003.006
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0065 52.20.003.0065
52.20.003.0068
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0068 52.20.003.0068
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0068 52.20.003.0068
52.20.003.0069
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0069 52.20.003.0069
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0069 52.20.003.0069
52.20.003.0077
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0077 52.20.003.0077
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0077 52.20.003.0077
52.20.003.0081
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0081 52.20.003.008
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0081 52.20.003.0081
52.20.003.0083
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0083 52.20.003.008
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0083 52.20.003.0083
52.20.003.0084
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0084 52.20.003.008
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0084 52.20.003.0084
52.20.003.0089
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0089 52.20.003.0089
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0089 52.20.003.0089
52.20.003.0090
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0090 52.20.003.0090
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0090 52.20.003.0090
52.20.003.0091
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0091 52.20.003.0091
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0091 52.20.003.0091
52.20.003.0092
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0092 52.20.003.0092
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0092 52.20.003.0092
52.20.003.0094
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0094 52.20.003.0094
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0094 52.20.003.0094
52.20.003.0095
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0095 52.20.003.009
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0095 52.20.003.0095
52.30.001.0001
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0001 52.30.001.0001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0001 52.30.001.0001
52.30.001.0007
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0007 52.30.001.0007
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0007 52.30.001.0007
52.30.001.0008
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0008 52.30.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0008 52.30.001.0008
52.30.001.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0009 52.30.001.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0009 52.30.001.0009
52.30.001.0010
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0010 52.30.001.0010
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0010 52.30.001.0010
52.30.001.0015
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0015 52.30.001.0015
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0015 52.30.001.0015
52.30.001.0016
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0016 52.30.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0016 52.30.001.001
52.40.006.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0002 52.40.006.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0002 52.40.006.000
52.40.006.0003
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0003 52.40.006.0003
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0003 52.40.006.0003
52.40.006.0004
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0004 52.40.006.0004
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0004 52.40.006.0004
52.40.006.0005
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0005 52.40.006.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0005 52.40.006.0005
52.40.006.0006
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0006 52.40.006.0006
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0006 52.40.006.0006
52.40.006.0007
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0007 52.40.006.0007
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0007 52.40.006.0007
52.40.006.0008
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0008 52.40.006.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0008 52.40.006.0008
52.40.006.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0009 52.40.006.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0009 52.40.006.0009
52.40.006.0011
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0011 52.40.006.0011
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0011 52.40.006.0011
52.40.006.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0012 52.40.006.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0012 52.40.006.0012
52.40.006.0018
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0018 52.40.006.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0018 52.40.006.001
52.40.006.0019
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0019 52.40.006.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0019 52.40.006.001
52.40.006.0024
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0024 52.40.006.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0024 52.40.006.002

70.20.001.00X1
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.00X1 70.20.001.00X1
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.00X1 70.20.001.00X1
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.00X1 70.20.001.00X1
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.00X1 70.20.001.00X1
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.00X1 70.20.001.00X1
70.20.001.0009
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0009 70.20.001.0009
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0009 70.20.001.0009
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0009 70.20.001.0009
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0009 70.20.001.0009
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0009 70.20.001.0009
70.20.001.0010
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0010 70.20.001.001
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0010 70.20.001.001
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0010 70.20.001.001
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0010 70.20.001.001
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0010 70.20.001.001
70.20.001.0016
INDICADOR RECEPCION INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR MONTAJE INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR CONEXIONADO INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR CONTRASTACION INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR PROTOCOLOS INDICADOR 70.20.001.0016 70.20.001.001
70.20.001.0018
INDICADOR RECEPCION INDICADOR 70.20.001.0018 70.20.001.0018
INDICADOR MONTAJE INDICADOR 70.20.001.0018 70.20.001.001
INDICADOR CONEXIONADO INDICADOR 70.20.001.0018 70.20.001.001
INDICADOR CONTRASTACION INDICADOR 70.20.001.0018 70.20.001.001
INDICADOR PROTOCOLOS INDICADOR 70.20.001.0018 70.20.001.0018
70.20.001.0020
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0020 70.20.001.0020
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0020 70.20.001.0020
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0020 70.20.001.0020
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0020 70.20.001.0020
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0020 70.20.001.0020
70.20.001.0022
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0022 70.20.001.0022
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0022 70.20.001.0022
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0022 70.20.001.0022
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0022 70.20.001.0022
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0022 70.20.001.0022
70.20.001.0023
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0023 70.20.001.0023
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0023 70.20.001.0023
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0023 70.20.001.0023
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0023 70.20.001.0023
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0023 70.20.001.0023
70.20.001.0026
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0026 70.20.001.0026
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0026 70.20.001.0026
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0026 70.20.001.0026
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0026 70.20.001.0026
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0026 70.20.001.0026
70.20.001.0028
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0028 70.20.001.0028
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0028 70.20.001.0028
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0028 70.20.001.0028
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0028 70.20.001.0028
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0028 70.20.001.0028
70.20.001.0029
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0029 70.20.001.0029
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0029 70.20.001.0029
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0029 70.20.001.0029
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0029 70.20.001.0029
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0029 70.20.001.0029
70.20.001.0030
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0030 70.20.001.0030
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0030 70.20.001.0030
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0030 70.20.001.0030
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0030 70.20.001.0030
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0030 70.20.001.0030
70.20.001.0031
SENSOR RECEPCION SENSOR 70.20.001.0031 70.20.001.0031
SENSOR MONTAJE SENSOR 70.20.001.0031 70.20.001.0031
SENSOR CONEXIONADO SENSOR 70.20.001.0031 70.20.001.0031
SENSOR CONTRASTACION SENSOR 70.20.001.0031 70.20.001.0031
SENSOR PROTOCOLOS SENSOR 70.20.001.0031 70.20.001.0031
70.20.001.0032
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0032 70.20.001.0032
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0032 70.20.001.0032
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0032 70.20.001.0032
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0032 70.20.001.0032
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0032 70.20.001.0032
70.20.001.0034
INDICADOR RECEPCION INDICADOR 70.20.001.0034 70.20.001.003
INDICADOR MONTAJE INDICADOR 70.20.001.0034 70.20.001.003
INDICADOR CONEXIONADO INDICADOR 70.20.001.0034 70.20.001.003
INDICADOR CONTRASTACION INDICADOR 70.20.001.0034 70.20.001.003
INDICADOR PROTOCOLOS INDICADOR 70.20.001.0034 70.20.001.003
70.20.001.0035
INDICADOR RECEPCION INDICADOR 70.20.001.0035 70.20.001.0035
INDICADOR MONTAJE INDICADOR 70.20.001.0035 70.20.001.0035
INDICADOR CONEXIONADO INDICADOR 70.20.001.0035 70.20.001.0035
INDICADOR CONTRASTACION INDICADOR 70.20.001.0035 70.20.001.0035
INDICADOR PROTOCOLOS INDICADOR 70.20.001.0035 70.20.001.0035
70.20.001.0037
SEMAFORO RECEPCION SEMAFORO 70.20.001.0037 70.20.001.0037
SEMAFORO MONTAJE SEMAFORO 70.20.001.0037 70.20.001.0037
SEMAFORO CONEXIONADO SEMAFORO 70.20.001.0037 70.20.001.0037
SEMAFORO CONTRASTACION SEMAFORO 70.20.001.0037 70.20.001.0037
SEMAFORO PROTOCOLOS SEMAFORO 70.20.001.0037 70.20.001.0037
70.20.001.0038
SIRENA RECEPCION SIRENA 70.20.001.0038 70.20.001.0038
SIRENA MONTAJE SIRENA 70.20.001.0038 70.20.001.0038
SIRENA CONEXIONADO SIRENA 70.20.001.0038 70.20.001.0038
SIRENA CONTRASTACION SIRENA 70.20.001.0038 70.20.001.0038
SIRENA PROTOCOLOS SIRENA 70.20.001.0038 70.20.001.0038
70.20.001.0039
BALIZA RECEPCION BALIZA 70.20.001.0039 70.20.001.0039
BALIZA MONTAJE BALIZA 70.20.001.0039 70.20.001.0039
BALIZA CONEXIONADO BALIZA 70.20.001.0039 70.20.001.0039
BALIZA CONTRASTACION BALIZA 70.20.001.0039 70.20.001.0039
BALIZA PROTOCOLO BALIZA 70.20.001.0039 70.20.001.0039
70.20.001.0045
SENSOR RECEPCION SENSOR 70.20.001.0045 70.20.001.0045
SENSOR MONTAJE SENSOR 70.20.001.0045 70.20.001.0045
SENSOR CONEXIONADO SENSOR 70.20.001.0045 70.20.001.0045
SENSOR CONTRASTACION SENSOR 70.20.001.0045 70.20.001.0045
SENSOR PROTOCOLOS SENSOR 70.20.001.0045 70.20.001.0045
70.20.001.0049
SENSOR RECEPCION SENSOR 70.20.001.0049 70.20.001.004
SENSOR MONTAJE SENSOR 70.20.001.0049 70.20.001.004
SENSOR CONEXIONADO SENSOR 70.20.001.0049 70.20.001.004
SENSOR CONTRASTACION SENSOR 70.20.001.0049 70.20.001.004
SENSOR PROTOCOLOS SENSOR 70.20.001.0049 70.20.001.004
70.20.001.0053
SENSOR RECEPCION SENSOR 70.20.001.0053 70.20.001.0053
SENSOR MONTAJE SENSOR 70.20.001.0053 70.20.001.0053
SENSOR CONEXIONADO SENSOR 70.20.001.0053 70.20.001.0053
SENSOR CONTRASTACION SENSOR 70.20.001.0053 70.20.001.0053
SENSOR PROTOCOLOS SENSOR 70.20.001.0053 70.20.001.0053
70.20.001.0055
DETECTOR RECEPCION DETECTOR 70.20.001.0055 70.20.001.0055
DETECTOR MONTAJE DETECTOR 70.20.001.0055 70.20.001.0055
DETECTOR CONEXIONADO DETECTOR 70.20.001.0055 70.20.001.0055
DETECTOR CONTRASTACION DETECTOR 70.20.001.0055 70.20.001.0055
DETECTOR PROTOCOLOS DETECTOR 70.20.001.0055 70.20.001.0055
70.20.001.00X2
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.00X2 70.20.001.00X2
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.00X2 70.20.001.00X2
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.00X2 70.20.001.00X2
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.00X2 70.20.001.00X2
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.00X2 70.20.001.00X2
70.20.003.0001
ANALIZADOR RECEPCION ANALIZADOR 70.20.003.0001 70.20.003.0001
ANALIZADOR MONTAJE ANALIZADOR 70.20.003.0001 70.20.003.0001
ANALIZADOR CONEXIONADO ANALIZADOR 70.20.003.0001 70.20.003.0001
ANALIZADOR CONTRASTACION ANALIZADO70.20.003.0001 70.20.003.0001
ANALIZADOR PROTOCOLO ANALIZADOR 70.20.003.0001 70.20.003.0001
70.20.003.0002
UNIDAD DE COMUNICARECEPCION UNIDAD COMUNI70.20.003.0002 70.20.003.0002
UNIDAD DE COMUNICAMONTAJE UNIDAD COMUNIC70.20.003.0002 70.20.003.0002
UNIDAD DE COMUNICACONEXIONADO UNIDAD COM70.20.003.0002 70.20.003.0002
UNIDAD DE COMUNICACONTRASTACION UNIDAD C 70.20.003.0002 70.20.003.0002
UNIDAD DE COMUNICAPROTOCOLOS UNIDAD COMUN70.20.003.0002 70.20.003.0002
70.20.003.0003
ILUMINACION RECEPCION ILUMINACION 70.20.003.0003 70.20.003.0003
ILUMINACION MONTAJE ILUMINACION 70.20.003.0003 70.20.003.0003
ILUMINACION CONEXIONADO ILUMINACION70.20.003.0003 70.20.003.0003
ILUMINACION CONTRASTACIONILUMINACIO70.20.003.0003 70.20.003.0003
ILUMINACION PROTOCOLOSILUMINACION 70.20.003.0003 70.20.003.0003
70.20.003.0010
DETECTOR RECEPCION DETECTOR 70.20.003.0010 70.20.003.0010
DETECTOR MONTAJE DETECTOR 70.20.003.0010 70.20.003.0010
DETECTOR CONEXIONADO DETECTOR 70.20.003.0010 70.20.003.0010
DETECTOR CONTRASTACION DETECTOR 70.20.003.0010 70.20.003.0010
DETECTOR PROTOCOLOS DETECTOR 70.20.003.0010 70.20.003.0010
70.20.004.0005
MANIFOLD RECEPCION MANIFOLD 70.20.004.0005 70.20.004.0005
MANIFOLD MONTAJE MANIFOLD 70.20.004.0005 70.20.004.0005
MANIFOLD CONEXIONADO MANIFOLD 70.20.004.0005 70.20.004.0005
MANIFOLD CONTRASTACION MANIFOLD 70.20.004.0005 70.20.004.0005
MANIFOLD PROTOCOLOS MANIFOLD 70.20.004.0005 70.20.004.0005
70.20.005.0001
PANEL RECEPCION PANEL 70.20.005.0001 70.20.005.0001
PANEL MONTAJE PANEL 70.20.005.0001 70.20.005.000
PANEL CONEXIONADO PANEL 70.20.005.0001 70.20.005.000
PANEL CONTRASTACION PANEL 70.20.005.0001 70.20.005.000
PANEL PROTOCOLOS PANEL 70.20.005.0001 70.20.005.0001
70.20.005.0002
PANEL RECEPCION PANEL 70.20.005.0002 70.20.005.0002
PANEL MONTAJE PANEL 70.20.005.0002 70.20.005.0002
PANEL CONEXIONADO PANEL 70.20.005.0002 70.20.005.0002
PANEL CONTRASTACION PANEL 70.20.005.0002 70.20.005.0002
PANEL PROTOCOLOS PANEL 70.20.005.0002 70.20.005.0002
70.20.005.0005
CAJA DE CONEXION RECEPCION CONEXIONADO VA70.20.005.0005 70.20.005.0005
CAJA DE CONEXION MONTAJE CONEXIONADO VAL70.20.005.0005 70.20.005.0005
CAJA DE CONEXION MONTAJE DUCTERIA CONEXI 70.20.005.0005 70.20.005.0005
CAJA DE CONEXION CONEXIONADO CONEXIONADO 70.20.005.0005 70.20.005.0005
CAJA DE CONEXION PROTOCOLOS CONEXIONADO 70.20.005.0005 70.20.005.0005
70.20.006.0002
TABLERO RECEPCION TABLERO 70.20.006.0002 70.20.006.0002
TABLERO MONTAJE INTERRUPTOR TABL70.20.006.0002 70.20.006.0002
TABLERO CONEXIONADO TABLERO 70.20.006.0002 70.20.006.0002
TABLERO CONTRASTACION TABLERO 70.20.006.0002 70.20.006.0002
TABLERO PROTOCOLOS TABLERO 70.20.006.0002 70.20.006.0002
70.20.008.0005
PLACA DE MONTAJE RECEPCION PLACAS DE MONTA
70.20.008.0005 70.20.008.0005
PLACA DE MONTAJE MONTAJE PLACAS DE MONTAJ70.20.008.0005 70.20.008.0005
PLACA DE MONTAJE CONEXIONADO PLACAS DE MO70.20.008.0005 70.20.008.0005
PLACA DE MONTAJE CONTRASTACION PLACAS DE 70.20.008.0005 70.20.008.0005
PLACA DE MONTAJE PROTOCOLOS PLACA DE MONT70.20.008.0005 70.20.008.0005
70.20.008.0009
CAMARA CCTV RECEPCION CAMARA CCTV 70.20.008.0009 70.20.008.0009
CAMARA CCTV MONTAJE CAMARA CCTV 70.20.008.0009 70.20.008.0009
CAMARA CCTV CONEXIONADO CAMARA CCT70.20.008.0009 70.20.008.0009
CAMARA CCTV CONTRASTACION CAMARA CC70.20.008.0009 70.20.008.0009
CAMARA CCTV PROTOCOLOS CAMARA CCTV 70.20.008.0009 70.20.008.0009
70.40.002.0001
CAJA DE CONEXION RECEPCION INSTRUMENTOS 70.40.002.0001 70.40.002.000
CAJA DE CONEXION MONTAJE INSTRUMENTOS 70.40.002.0001 70.40.002.000
CAJA DE CONEXION CONEXIONADO INSTRUMENTO70.40.002.0001 70.40.002.000
CAJA DE CONEXION CONTRASTACION INSTRUMEN70.40.002.0001 70.40.002.000
CAJA DE CONEXION PROTOCOLOS INSTRUMENTOS70.40.002.0001 70.40.002.000
70.40.002.0002
CAJA DE CONEXION RECEPCION INSTRUMENTOS 70.40.002.0002 70.40.002.0002
CAJA DE CONEXION MONTAJE INSTRUMENTOS 70.40.002.0002 70.40.002.0002
CAJA DE CONEXION CONEXIONADO INSTRUMENTO70.40.002.0002 70.40.002.0002
CAJA DE CONEXION CONTRASTACION INSTRUMEN70.40.002.0002 70.40.002.0002
CAJA DE CONEXION PROTOCOLOS INSTRUMENTOS70.40.002.0002 70.40.002.0002
70.40.002.0005
RACK REMOTO RECEPCION INSTRUMENTOS 70.40.002.0005 70.40.002.0005
RACK REMOTO MONTAJE INSTRUMENTOS 70.40.002.0005 70.40.002.000
RACK REMOTO CONEXIONADO INSTRUMENTO70.40.002.0005 70.40.002.000
RACK REMOTO CONTRASTACION INSTRUMEN70.40.002.0005 70.40.002.000
RACK REMOTO PROTOCOLOS INSTRUMENTOS70.40.002.0005 70.40.002.0005
70.50.001.0002
ESTACION DE TELEFON RECEPCION INSTRUMENTOS 70.50.001.0002 70.50.001.0002
ESTACION DE TELEFON MONTAJE INSTRUMENTOS 70.50.001.0002 70.50.001.000
ESTACION DE TELEFON CONEXIONADO INSTRUMENTO70.50.001.0002 70.50.001.000
ESTACION DE TELEFON CONTRASTACION INSTRUMEN70.50.001.0002 70.50.001.000
ESTACION DE TELEFON PROTOCOLOS INSTRUMENTOS70.50.001.0002 70.50.001.0002
70.50.001.0003
BOCINA RECEPCION INSTRUMENTOS 70.50.001.0003 70.50.001.0003
BOCINA MONTAJE INSTRUMENTOS 70.50.001.0003 70.50.001.000
BOCINA CONEXIONADO INSTRUMENTO70.50.001.0003 70.50.001.000
BOCINA CONTRASTACION INSTRUMEN70.50.001.0003 70.50.001.000
BOCINA PROTOCOLOS INSTRUMENTOS70.50.001.0003 70.50.001.0003
70.50.001.0005
GABINETE DE COMUNI RECEPCION INSTRUMENTOS 70.50.001.0005 70.50.001.0005
GABINETE DE COMUNI MONTAJE INSTRUMENTOS 70.50.001.0005 70.50.001.0005
GABINETE DE COMUNI CONEXIONADO INSTRUMENTO70.50.001.0005 70.50.001.0005
GABINETE DE COMUNI CONTRASTACION INSTRUMEN70.50.001.0005 70.50.001.0005
GABINETE DE COMUNI PROTOCOLOS INSTRUMENTOS70.50.001.0005 70.50.001.0005
70.60.001.0002
CAMARA CCTV RECEPCION INSTRUMENTOS 70.60.001.0002 70.60.001.0002
CAMARA CCTV MONTAJE INSTRUMENTOS 70.60.001.0002 70.60.001.0002
CAMARA CCTV CONEXIONADO INSTRUMENTO70.60.001.0002 70.60.001.0002
CAMARA CCTV CONTRASTACION INSTRUMEN70.60.001.0002 70.60.001.0002
CAMARA CCTV PROTOCOLOS INSTRUMENTOS70.60.001.0002 70.60.001.0002
70.60.001.0003
GABINETE CCTV RECEPCION INSTRUMENTOS 70.60.001.0003 70.60.001.0003
GABINETE CCTV MONTAJE INSTRUMENTOS 70.60.001.0003 70.60.001.0003
GABINETE CCTV CONEXIONADO INSTRUMENTO70.60.001.0003 70.60.001.0003
GABINETE CCTV CONTRASTACION INSTRUMEN70.60.001.0003 70.60.001.0003
GABINETE CCTV PROTOCOLOS INSTRUMENTOS70.60.001.0003 70.60.001.0003
70.70.002.0001
LABORATORIO DE PRUERECEPCION INSTRUMENTOS 70.70.002.0001 70.70.002.0001
LABORATORIO DE PRUEMONTAJE INSTRUMENTOS 70.70.002.0001 70.70.002.0001
LABORATORIO DE PRUECONEXIONADO INSTRUMENTO70.70.002.0001 70.70.002.0001
LABORATORIO DE PRUECONTRASTACION INSTRUMEN70.70.002.0001 70.70.002.0001
LABORATORIO DE PRUEPROTOCOLOS INSTRUMENTOS70.70.002.0001 70.70.002.0001
70.80.001.0001
BANDEJAS DE PROTECCRECEPCION INSTRUMENTOS 70.80.001.0001 70.80.001.0001
BANDEJAS DE PROTECCMONTAJE INSTRUMENTOS 70.80.001.0001 70.80.001.0001
BANDEJAS DE PROTECCCONEXIONADO INSTRUMENTO70.80.001.0001 70.80.001.0001
70.80.001.0002
TUBING AIRE RECEPCION INSTRUMENTOS 70.80.001.0002 70.80.001.000
TUBING AIRE MONTAJE INSTRUMENTOS 70.80.001.0002 70.80.001.000
TUBING AIRE CONEXIONADO INSTRUMENTO70.80.001.0002 70.80.001.000

00.25.002.0001
ALCANTARILLA TUNEL CORRUGADO 00.25.002.0001 00.25.002.000
00.40.005.0009
ALCANTARILLA TUNEL CORRUGADO 00.40.005.0009 00.40.005.000

10.20.001.0001
PERNO SUMINISTRO Y COLOCACION 10.20.001.0001 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0001 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0001 10.20.001.000
10.20.001.0002
PERNO SUMINISTRO Y COLOCACION 10.20.001.0002 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0002 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0002 10.20.001.000
10.20.001.0101
PERNO SUMINISTRO Y COLOCACION 10.20.001.0101 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0101 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0101 10.20.001.010
10.20.001.0102
PERNO SUMINISTRO Y COLOCACION 10.20.001.0102 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0102 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0102 10.20.001.010
10.20.001.0003
PERNO SUMINISTRO Y COLOCACION 10.20.001.0003 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0003 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0003 10.20.001.000
10.20.001.0004
PERNO SUMINISTRO Y COLOCACION 10.20.001.0004 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0004 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0004 10.20.001.000
10.20.001.0103
PERNO SUMINISTRO Y COLOCACION 10.20.001.0103 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0103 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0103 10.20.001.010
10.20.001.0104
PERNO SUMINISTRO Y COLOCACION 10.20.001.0104 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0104 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0104 10.20.001.010
10.20.002.0001
PERNO SUMINISTRO Y COLOCACION 10.20.002.0001 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0001 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0001 10.20.002.000
10.20.002.0002
PERNO SUMINISTRO Y COLOCACION 10.20.002.0002 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0002 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0002 10.20.002.000
10.30.001.0001
MORTERO NIVELACIONSUMINISTRO MORTERO CEME10.30.001.0001 10.30.001.000
10.30.001.0002
MORTERO NIVELACIONPLACAS NIVELACIÓN MORTER10.30.001.0002 10.30.001.0002
MORTERO NIVELACIONVACIADO MORTERO CEMENTI10.30.001.0002 10.30.001.000
MORTERO NIVELACIONPUNCH LIST MORTERO CEMEN10.30.001.0002 10.30.001.000
10.30.001.0003
MORTERO NIVELACIONSUMINISTRO MORTERO EPOX10.30.001.0003 10.30.001.000
10.30.001.0004
MORTERO NIVELACIONPLACAS NIVELACIÓN MORTER10.30.001.0004 10.30.001.0004
MORTERO NIVELACIONVACIADO MORTERO EPOXICO10.30.001.0004 10.30.001.000
MORTERO NIVELACIONPUNCH LIST MORTERO EPOXI 10.30.001.0004 10.30.001.000
10.40.001.0002
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0002 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0002 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0002 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0002 10.40.001.000
10.40.001.0005
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0005 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0005 10.40.001.000
10.40.001.0009
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0009 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0009 10.40.001.000
10.40.001.0029
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0029 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0029 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0029 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0029 10.40.001.002
10.40.001.0030
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0030 10.40.001.003
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0030 10.40.001.003
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0030 10.40.001.003
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0030 10.40.001.003
10.40.001.0040
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0040 10.40.001.004
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0040 10.40.001.004
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0040 10.40.001.004
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0040 10.40.001.004
10.40.001.0042
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0042 10.40.001.004
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0042 10.40.001.004
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0042 10.40.001.004
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0042 10.40.001.004
10.40.002.2169
CONCRETO COLOCACION ACERO 10.40.002.2169 10.40.002.216
CONCRETO ENCOFRADO CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO VACIADO CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO DESCIMBRE CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO LIMPIEZA CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO PUNCH LIST CONCRETO 10.40.002.2169 10.40.002.216
10.40.002.2805
CONCRETO COLOCACION ACERO 10.40.002.2805 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2805 10.40.002.280
10.40.002.2809
CONCRETO COLOCACION ACERO 10.40.002.2809 10.40.002.2809
CONCRETO ENCOFRADO CONCRETO 10.40.002.2809 10.40.002.2809
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2809 10.40.002.2809
CONCRETO VACIADO CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2809 10.40.002.2809
CONCRETO LIMPIEZA CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2809 10.40.002.2809
10.40.002.2829
CONCRETO COLOCACION ACERO 10.40.002.2829 10.40.002.282
CONCRETO ENCOFRADO CONCRETO 10.40.002.2829 10.40.002.282
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2829 10.40.002.282
CONCRETO VACIADO CONCRETO 10.40.002.2829 10.40.002.282
CONCRETO DESCIMBRE CONCRETO 10.40.002.2829 10.40.002.282
CONCRETO LIMPIEZA CONCRETO 10.40.002.2829 10.40.002.282
CONCRETO PUNCH LIST CONCRETO 10.40.002.2829 10.40.002.282
10.40.002.2830
CONCRETO COLOCACION ACERO 10.40.002.2830 10.40.002.283
CONCRETO ENCOFRADO CONCRETO 10.40.002.2830 10.40.002.283
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2830 10.40.002.283
CONCRETO VACIADO CONCRETO 10.40.002.2830 10.40.002.283
CONCRETO DESCIMBRE CONCRETO 10.40.002.2830 10.40.002.283
CONCRETO LIMPIEZA CONCRETO 10.40.002.2830 10.40.002.283
CONCRETO PUNCH LIST CONCRETO 10.40.002.2830 10.40.002.283
10.40.002.2840
CONCRETO COLOCACION ACERO 10.40.002.2840 10.40.002.284
CONCRETO ENCOFRADO CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO VACIADO CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO DESCIMBRE CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO LIMPIEZA CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO PUNCH LIST CONCRETO 10.40.002.2840 10.40.002.284
10.40.002.2842
CONCRETO COLOCACION ACERO 10.40.002.2842 10.40.002.284
CONCRETO ENCOFRADO CONCRETO 10.40.002.2842 10.40.002.284
CONCRETO VACIADO CONCRETO 10.40.002.2842 10.40.002.284
CONCRETO DESCIMBRE CONCRETO 10.40.002.2842 10.40.002.284
CONCRETO LIMPIEZA CONCRETO 10.40.002.2842 10.40.002.284
CONCRETO PUNCH LIST CONCRETO 10.40.002.2842 10.40.002.284
10.60.002.1061
SOLADO ENCOFRADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO VACIADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO DESCIMBRE CONCRETO 10.60.002.1061 10.60.002.106
SOLADO LIMPIEZA CONCRETO 10.60.002.1061 10.60.002.106
SOLADO PUNCH LIST CONCRETO 10.60.002.1061 10.60.002.106

20.10.005.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.005.0003 20.10.005.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.005.0003 20.10.005.0003

20.10.001.0003
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0003 20.10.001.000
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0003 20.10.001.000
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0003 20.10.001.000
20.10.001.0103
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0103 20.10.001.010
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0103 20.10.001.010
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0103 20.10.001.010
20.10.001.0203
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0203 20.10.001.020
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0203 20.10.001.0203
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0203 20.10.001.020
20.10.005.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.005.0003 20.10.005.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.005.0003 20.10.005.000
20.10.006.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.006.0003 20.10.006.0003
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.006.0003 20.10.006.0003
20.10.009.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0003 20.10.009.0003
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0003 20.10.009.0003
20.10.009.0103
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0103 20.10.009.0103
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0103 20.10.009.0103
20.10.009.0203
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0203 20.10.009.0203
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0203 20.10.009.0203

30.10.001.2001
REVESTIMIENTO ARMADO Y MONTAJE REVEST 30.10.001.2001 30.10.001.20010
REVESTIMIENTO FIJACIONES REVESTIMIENTO 30.10.001.2001 30.10.001.20010
REVESTIMIENTO PROTOCOLOS REVESTIMIENTO30.10.001.2001 30.10.001.20010
30.10.002.2003
REVESTIMIENTO ARMADO Y MONTAJE REVEST 30.10.002.2003 30.10.002.20030
REVESTIMIENTO FIJACIONES REVESTIMIENTO 30.10.002.2003 30.10.002.20030
REVESTIMIENTO PROTOCOLOS REVESTIMIENTO30.10.002.2003 30.10.002.20030

00.25.004.0001
EXCAVACION EXCAVACION MASIVA TERREN 00.25.004.0001 00.25.004.000
00.25.007.0001
EXCAVACION EXCAVACION MASIVA RIPPER 00.25.007.0001 00.25.007.000
00.25.007.0002
EXCAVACION EXCAVACION MASIVA EN ROC 00.25.007.0002 00.25.007.000
00.30.001.0004
RELLENO RELLENO GRAVA DE AISLACIÓN00.30.001.0004 00.30.001.000
00.30.004.0002
RELLENO RELLENO MASIVO CLASE B 00.30.004.0002 00.30.004.000
00.30.004.0003
RELLENO RELLENO MASIVO CLASE C 00.30.004.0003 00.30.004.000
00.30.007.0001
RELLENO PERFILADO SUBRASANTE 00.30.007.0001 00.30.007.000
00.30.007.0002
RELLENO PERFILADO PLATAFORMAS 00.30.007.0002 00.30.007.000
00.40.002.0001
RELLENO AFIRMADO PARA PLATAFORM00.40.002.0001 00.40.002.000
00.40.007.0002
BERMA PRETIL DE SEGURIDAD 00.40.007.0002 00.40.007.000

00.25.001.0001
EXCAVACION EXCAVACION PARA PUESTA A T00.25.001.0001 00.25.001.000
00.25.001.0002
EXCAVACION EXCAVACION PARA CONDUIT 00.25.001.0002 00.25.001.000
00.25.003.0001
EXCAVACION EXCAVACION PARA BANCODUC00.25.003.0001 00.25.003.000
00.25.003.0002
EXCAVACION EXCAVACION PARA MANHOLES00.25.003.0002 00.25.003.000
00.25.003.0003
EXCAVACION EXCAVACION FUNDACIONES D00.25.003.0003 00.25.003.000
00.30.002.0001
RELLENO RELLENO PARA PUESTA A TIER 00.30.002.0001 00.30.002.000
00.30.002.0002
RELLENO RELLENO PARA CONDUIT 00.30.002.0002 00.30.002.000
00.30.003.0004
RELLENO RELLENO PARA BANCODUCTOS00.30.003.0004 00.30.003.000
00.30.003.0005
RELLENO RELLENO PARA MANHOLES 00.30.003.0005 00.30.003.000
00.30.003.0006
RELLENO RELLENO FUNDACIONES DE PA00.30.003.0006 00.30.003.000

10.20.001.0001
PERNO SUMINISTRO Y COLOCACION 10.20.001.0001 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0001 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0001 10.20.001.000
10.20.001.0002
PERNO SUMINISTRO Y COLOCACION 10.20.001.0002 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0002 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0002 10.20.001.000
10.20.001.0101
PERNO SUMINISTRO Y COLOCACION 10.20.001.0101 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0101 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0101 10.20.001.010
10.20.001.0102
PERNO SUMINISTRO Y COLOCACION 10.20.001.0102 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0102 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0102 10.20.001.010
10.20.001.0003
PERNO SUMINISTRO Y COLOCACION 10.20.001.0003 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0003 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0003 10.20.001.000
10.20.001.0004
PERNO SUMINISTRO Y COLOCACION 10.20.001.0004 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0004 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0004 10.20.001.000
10.20.001.0103
PERNO SUMINISTRO Y COLOCACION 10.20.001.0103 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0103 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0103 10.20.001.010
10.20.001.0104
PERNO SUMINISTRO Y COLOCACION 10.20.001.0104 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0104 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0104 10.20.001.010
10.20.002.0001
PERNO SUMINISTRO Y COLOCACION 10.20.002.0001 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0001 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0001 10.20.002.000
10.20.002.0002
PERNO SUMINISTRO Y COLOCACION 10.20.002.0002 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0002 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0002 10.20.002.000
10.40.001.0001
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0001 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0001 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0001 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0001 10.40.001.000
10.40.001.0003
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0003 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0003 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0003 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0003 10.40.001.000
10.40.001.0005
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0005 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0005 10.40.001.000
10.40.001.0009
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0009 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0009 10.40.001.000
10.40.001.0010
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0010 10.40.001.001
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0010 10.40.001.001
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0010 10.40.001.001
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0010 10.40.001.001
10.40.001.0020
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0020 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0020 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0020 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0020 10.40.001.002
10.40.001.0021
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0021 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0021 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0021 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0021 10.40.001.002
10.40.001.0022
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0022 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0022 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0022 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0022 10.40.001.002
10.40.001.0026
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0026 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0026 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0026 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0026 10.40.001.002
10.40.001.0064
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0064 10.40.001.006
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0064 10.40.001.006
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0064 10.40.001.006
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0064 10.40.001.006
10.40.001.0069
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0069 10.40.001.006
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0069 10.40.001.006
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0069 10.40.001.006
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0069 10.40.001.006
10.40.002.2169
CONCRETO COLOCACION ACERO 10.40.002.2169 10.40.002.216
CONCRETO ENCOFRADO CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO VACIADO CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO DESCIMBRE CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO LIMPIEZA CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO PUNCH LIST CONCRETO 10.40.002.2169 10.40.002.216
10.40.002.2801
CONCRETO COLOCACION ACERO 10.40.002.2801 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2801 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2801 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2801 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2801 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2801 10.40.002.280
10.40.002.2803
CONCRETO COLOCACION ACERO 10.40.002.2803 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2803 10.40.002.2803
CONCRETO VACIADO CONCRETO 10.40.002.2803 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2803 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2803 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2803 10.40.002.280
10.40.002.2805
CONCRETO COLOCACION ACERO 10.40.002.2805 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2805 10.40.002.280
10.40.002.2809
CONCRETO COLOCACION ACERO 10.40.002.2809 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2809 10.40.002.2809
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2809 10.40.002.280
10.40.002.2810
CONCRETO COLOCACION ACERO 10.40.002.2810 10.40.002.281
CONCRETO ENCOFRADO CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO VACIADO CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO DESCIMBRE CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO LIMPIEZA CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO PUNCH LIST CONCRETO 10.40.002.2810 10.40.002.281
10.40.002.2820
CONCRETO COLOCACION ACERO 10.40.002.2820 10.40.002.282
CONCRETO ENCOFRADO CONCRETO 10.40.002.2820 10.40.002.282
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2820 10.40.002.282
CONCRETO VACIADO CONCRETO 10.40.002.2820 10.40.002.282
CONCRETO DESCIMBRE CONCRETO 10.40.002.2820 10.40.002.282
CONCRETO LIMPIEZA CONCRETO 10.40.002.2820 10.40.002.282
CONCRETO PUNCH LIST CONCRETO 10.40.002.2820 10.40.002.282
10.40.002.2821
CONCRETO COLOCACION ACERO 10.40.002.2821 10.40.002.282
CONCRETO ENCOFRADO CONCRETO 10.40.002.2821 10.40.002.282
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2821 10.40.002.282
CONCRETO VACIADO CONCRETO 10.40.002.2821 10.40.002.282
CONCRETO DESCIMBRE CONCRETO 10.40.002.2821 10.40.002.282
CONCRETO LIMPIEZA CONCRETO 10.40.002.2821 10.40.002.282
CONCRETO PUNCH LIST CONCRETO 10.40.002.2821 10.40.002.282
10.40.002.2822
CONCRETO COLOCACION ACERO 10.40.002.2822 10.40.002.282
CONCRETO ENCOFRADO CONCRETO 10.40.002.2822 10.40.002.282
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2822 10.40.002.282
CONCRETO VACIADO CONCRETO 10.40.002.2822 10.40.002.282
CONCRETO DESCIMBRE CONCRETO 10.40.002.2822 10.40.002.282
CONCRETO LIMPIEZA CONCRETO 10.40.002.2822 10.40.002.282
CONCRETO PUNCH LIST CONCRETO 10.40.002.2822 10.40.002.282
10.40.002.2826
CONCRETO COLOCACION ACERO 10.40.002.2826 10.40.002.282
CONCRETO ENCOFRADO CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO VACIADO CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO DESCIMBRE CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO LIMPIEZA CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO PUNCH LIST CONCRETO 10.40.002.2826 10.40.002.282
10.40.002.1564
CONCRETO COLOCACION ACERO 10.40.002.1564 10.40.002.156
CONCRETO ENCOFRADO CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO VACIADO CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO DESCIMBRE CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO LIMPIEZA CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO PUNCH LIST CONCRETO 10.40.002.1564 10.40.002.156
10.40.002.1565
CONCRETO COLOCACION ACERO 10.40.002.1565 10.40.002.156
CONCRETO ENCOFRADO CONCRETO 10.40.002.1565 10.40.002.156
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.1565 10.40.002.156
CONCRETO VACIADO CONCRETO 10.40.002.1565 10.40.002.156
CONCRETO DESCIMBRE CONCRETO 10.40.002.1565 10.40.002.156
CONCRETO LIMPIEZA CONCRETO 10.40.002.1565 10.40.002.156
CONCRETO PUNCH LIST CONCRETO 10.40.002.1565 10.40.002.156
10.60.002.1061
SOLADO ENCOFRADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO VACIADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO DESCIMBRE CONCRETO 10.60.002.1061 10.60.002.106
SOLADO LIMPIEZA CONCRETO 10.60.002.1061 10.60.002.106
SOLADO PUNCH LIST CONCRETO 10.60.002.1061 10.60.002.106
10.60.002.1062
CONCRETO ENCOFRADO CONCRETO 10.60.002.1062 10.60.002.106
CONCRETO VACIADO CONCRETO 10.60.002.1062 10.60.002.106
CONCRETO DESCIMBRE CONCRETO 10.60.002.1062 10.60.002.106
CONCRETO LIMPIEZA CONCRETO 10.60.002.1062 10.60.002.1062
CONCRETO PUNCH LIST CONCRETO 10.60.002.1062 10.60.002.1062

20.10.001.0003
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0003 20.10.001.000
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0003 20.10.001.000
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0003 20.10.001.000
20.10.001.0103
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0103 20.10.001.010
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0103 20.10.001.010
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0103 20.10.001.010

60.20.001.0003
ESCALERILLA PORTAC SUMINISTRO ESCALERILLA 60.20.001.0003 60.20.001.000
ESCALERILLA PORTAC MONTAJE ESCALERILLA 60.20.001.0003 60.20.001.000
ESCALERILLA PORTAC PROTOCOLO ESCALERILLA 60.20.001.0003 60.20.001.000
60.20.001.0005
ESCALERILLA PORTAC SUMINISTRO ESCALERILLA 60.20.001.0005 60.20.001.000
ESCALERILLA PORTAC MONTAJE ESCALERILLA 60.20.001.0005 60.20.001.000
ESCALERILLA PORTAC PROTOCOLO ESCALERILLA 60.20.001.0005 60.20.001.000
60.20.001.0006
ESCALERILLA PORTAC SUMINISTRO ESCALERILLA 60.20.001.0006 60.20.001.000
ESCALERILLA PORTAC MONTAJE ESCALERILLA 60.20.001.0006 60.20.001.000
ESCALERILLA PORTAC PROTOCOLO ESCALERILLA 60.20.001.0006 60.20.001.000
60.20.001.0026
BANDEJA SUMINISTRO BANDEJA 60.20.001.0026 60.20.001.002
BANDEJA MONTAJE BANDEJA 60.20.001.0026 60.20.001.002
BANDEJA PROTOCOLOS BANDEJA 60.20.001.0026 60.20.001.002
60.20.002.0002
CONDUIT SUMINISTRO CONDUIT 60.20.002.0002 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0002 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0002 60.20.002.000
60.20.002.0003
CONDUIT SUMINISTRO CONDUIT 60.20.002.0003 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0003 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0003 60.20.002.000
60.20.002.0004
CONDUIT SUMINISTRO CONDUIT 60.20.002.0004 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0004 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0004 60.20.002.000
60.20.002.0005
CONDUIT SUMINISTRO CONDUIT 60.20.002.0005 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0005 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0005 60.20.002.000
60.20.002.0006
CONDUIT SUMINISTRO CONDUIT 60.20.002.0006 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0006 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0006 60.20.002.000
60.20.002.0007
CONDUIT SUMINISTRO CONDUIT 60.20.002.0007 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0007 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0007 60.20.002.000
60.20.002.0032
CONDUIT SUMINISTRO CONDUIT 60.20.002.0032 60.20.002.003
CONDUIT MONTAJE CONDUIT 60.20.002.0032 60.20.002.003
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0032 60.20.002.003
60.20.002.0043
CONDUIT SUMINISTRO CONDUIT 60.20.002.0043 60.20.002.004
CONDUIT MONTAJE CONDUIT 60.20.002.0043 60.20.002.004
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0043 60.20.002.004
60.20.002.0057
CONDUIT SUMINISTRO CONDUIT 60.20.002.0057 60.20.002.005
CONDUIT MONTAJE CONDUIT 60.20.002.0057 60.20.002.005
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0057 60.20.002.005
60.20.002.0058
CONDUIT SUMINISTRO CONDUIT 60.20.002.0058 60.20.002.005
CONDUIT MONTAJE CONDUIT 60.20.002.0058 60.20.002.005
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0058 60.20.002.005
60.30.001.1103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.1103 60.30.001.110
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.1103 60.30.001.110
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.1103 60.30.001.110
60.30.001.3103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.3103 60.30.001.3103
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.3103 60.30.001.310
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.3103 60.30.001.310
60.30.001.3305
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.3305 60.30.001.3305
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.3305 60.30.001.330
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.3305 60.30.001.3305
60.30.001.3306
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.3306 60.30.001.3306
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.3306 60.30.001.330
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.3306 60.30.001.3306
60.30.001.3310
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.3310 60.30.001.3310
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.3310 60.30.001.331
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.3310 60.30.001.331
60.30.001.3311
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.3311 60.30.001.331
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.3311 60.30.001.331
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.3311 60.30.001.331
60.30.001.6102
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6102 60.30.001.610
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6102 60.30.001.610
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6102 60.30.001.610
60.30.001.6104
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6104 60.30.001.610
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6104 60.30.001.610
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6104 60.30.001.610
60.30.001.6305
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6305 60.30.001.6305
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6305 60.30.001.630
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6305 60.30.001.630
60.30.001.6306
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6306 60.30.001.6306
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6306 60.30.001.630
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6306 60.30.001.6306
60.30.001.6307
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6307 60.30.001.6307
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6307 60.30.001.630
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6307 60.30.001.6307
60.30.001.6309
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6309 60.30.001.6309
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6309 60.30.001.630
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6309 60.30.001.6309
60.30.001.6313
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6313 60.30.001.6313
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6313 60.30.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6313 60.30.001.6313
60.30.001.6314
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6314 60.30.001.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6314 60.30.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6314 60.30.001.631
60.30.001.6409
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6409 60.30.001.640
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6409 60.30.001.640
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6409 60.30.001.640
60.30.001.6410
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6410 60.30.001.6410
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6410 60.30.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6410 60.30.001.641
60.30.001.6411
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6411 60.30.001.6411
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6411 60.30.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6411 60.30.001.6411
60.30.001.6412
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6412 60.30.001.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6412 60.30.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6412 60.30.001.641
60.30.001.6413
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6413 60.30.001.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6413 60.30.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6413 60.30.001.641
60.30.001.6414
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6414 60.30.001.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6414 60.30.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6414 60.30.001.641
60.30.001.6511
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6511 60.30.001.6511
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6511 60.30.001.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6511 60.30.001.651
60.30.001.6513
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6513 60.30.001.651
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6513 60.30.001.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6513 60.30.001.651
60.30.001.6514
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6514 60.30.001.651
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6514 60.30.001.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6514 60.30.001.651
60.30.001.7002
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.7002 60.30.001.700
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.7002 60.30.001.700
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.7002 60.30.001.700
60.30.001.7012
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.7012 60.30.001.701
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.7012 60.30.001.701
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.7012 60.30.001.701
60.30.001.8011
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.8011 60.30.001.801
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.8011 60.30.001.801
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.8011 60.30.001.801
60.30.001.8012
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.8012 60.30.001.801
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.8012 60.30.001.801
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.8012 60.30.001.801
60.30.001.9113
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.9113 60.30.001.911
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.9113 60.30.001.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.9113 60.30.001.911
60.30.001.9114
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.9114 60.30.001.911
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.9114 60.30.001.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.9114 60.30.001.911
60.30.002.1103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.1103 60.30.002.110
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.1103 60.30.002.110
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.1103 60.30.002.110
60.30.002.1306
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.1306 60.30.002.130
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.1306 60.30.002.130
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.1306 60.30.002.130
60.30.002.1307
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.1307 60.30.002.130
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.1307 60.30.002.130
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.1307 60.30.002.130
60.30.002.1405
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.1405 60.30.002.140
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.1405 60.30.002.140
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.1405 60.30.002.140
60.30.002.3103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.3103 60.30.002.310
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.3103 60.30.002.310
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.3103 60.30.002.310
60.30.002.3105
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.3105 60.30.002.3105
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.3105 60.30.002.310
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.3105 60.30.002.310
60.30.002.3305
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.3305 60.30.002.330
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.3305 60.30.002.330
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.3305 60.30.002.330
60.30.002.3306
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.3306 60.30.002.330
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.3306 60.30.002.330
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.3306 60.30.002.330
60.30.002.3310
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.3310 60.30.002.331
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.3310 60.30.002.331
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.3310 60.30.002.331
60.30.002.3311
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.3311 60.30.002.331
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.3311 60.30.002.331
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.3311 60.30.002.331
60.30.002.6102
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6102 60.30.002.610
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6102 60.30.002.610
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6102 60.30.002.610
60.30.002.6104
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6104 60.30.002.610
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6104 60.30.002.610
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6104 60.30.002.610
60.30.002.6305
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6305 60.30.002.630
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6305 60.30.002.630
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6305 60.30.002.630
60.30.002.6306
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6306 60.30.002.630
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6306 60.30.002.630
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6306 60.30.002.630
60.30.002.6307
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6307 60.30.002.630
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6307 60.30.002.630
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6307 60.30.002.630
60.30.002.6309
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6309 60.30.002.630
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6309 60.30.002.630
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6309 60.30.002.630
60.30.002.6312
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6312 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6312 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6312 60.30.002.631
60.30.002.6313
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6313 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6313 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6313 60.30.002.631
60.30.002.6314
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6314 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6314 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6314 60.30.002.631
60.30.002.6315
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6315 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6315 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6315 60.30.002.631
60.30.002.6409
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6409 60.30.002.640
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6409 60.30.002.640
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6409 60.30.002.640
60.30.002.6410
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6410 60.30.002.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6410 60.30.002.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6410 60.30.002.641
60.30.002.6411
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6411 60.30.002.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6411 60.30.002.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6411 60.30.002.641
60.30.002.6412
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6412 60.30.002.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6412 60.30.002.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6412 60.30.002.641
60.30.002.6413
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6413 60.30.002.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6413 60.30.002.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6413 60.30.002.641
60.30.002.6414
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6414 60.30.002.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6414 60.30.002.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6414 60.30.002.641
60.30.002.6511
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6511 60.30.002.651
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6511 60.30.002.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6511 60.30.002.651
60.30.002.6513
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6513 60.30.002.651
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6513 60.30.002.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6513 60.30.002.651
60.30.002.6514
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6514 60.30.002.651
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6514 60.30.002.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6514 60.30.002.651
60.30.002.7002
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7002 60.30.002.700
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7002 60.30.002.700
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7002 60.30.002.700
60.30.002.7012
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7012 60.30.002.701
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7012 60.30.002.701
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7012 60.30.002.701
60.30.002.7021
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7021 60.30.002.702
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7021 60.30.002.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7021 60.30.002.702
60.30.002.7022
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7022 60.30.002.702
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7022 60.30.002.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7022 60.30.002.702
60.30.002.7221
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7221 60.30.002.722
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7221 60.30.002.722
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7221 60.30.002.722
60.30.002.7331
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7331 60.30.002.733
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7331 60.30.002.733
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7331 60.30.002.733
60.30.002.7334
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7334 60.30.002.733
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7334 60.30.002.733
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7334 60.30.002.733
60.30.002.7338
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7338 60.30.002.733
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7338 60.30.002.733
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7338 60.30.002.733
60.30.002.8101
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8101 60.30.002.810
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8101 60.30.002.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8101 60.30.002.810
60.30.002.8102
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8102 60.30.002.810
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8102 60.30.002.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8102 60.30.002.810
60.30.002.8300
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8300 60.30.002.830
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8300 60.30.002.830
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8300 60.30.002.830
60.30.002.9114
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.9114 60.30.002.911
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.9114 60.30.002.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.9114 60.30.002.911
60.40.001.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0001 60.40.001.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0001 60.40.001.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0001 60.40.001.000
60.40.001.0002
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0002 60.40.001.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0002 60.40.001.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0002 60.40.001.000
60.40.002.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0001 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0001 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0001 60.40.002.000
60.40.002.0002
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0002 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0002 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0002 60.40.002.000
60.40.002.0003
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0003 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0003 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0003 60.40.002.000
60.40.003.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.003.0001 60.40.003.0001
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.003.0001 60.40.003.0001
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.003.0001 60.40.003.0001
60.40.004.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.004.0001 60.40.004.0001
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.004.0001 60.40.004.0001
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.004.0001 60.40.004.0001
60.40.005.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.005.0001 60.40.005.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.005.0001 60.40.005.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.005.0001 60.40.005.000
60.40.006.0004
PARARRAYOS SUMINISTRO PARARRAYOS 60.40.006.0004 60.40.006.0004
PARARRAYOS MONTAJE PARARRAYOS 60.40.006.0004 60.40.006.0004
PARARRAYOS PROTOCOLO PARARRAYOS 60.40.006.0004 60.40.006.0004
60.40.006.0005
PARARRAYOS SUMINISTRO PARARRAYOS 60.40.006.0005 60.40.006.0005
PARARRAYOS MONTAJE PARARRAYOS 60.40.006.0005 60.40.006.0005
PARARRAYOS PROTOCOLO PARARRAYOS 60.40.006.0005 60.40.006.000
60.50.001.1123
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.1123 60.50.001.1123
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.1123 60.50.001.1123
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.1123 60.50.001.1123
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.1123 60.50.001.1123
60.50.001.1406
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.1406 60.50.001.1406
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.1406 60.50.001.140
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.1406 60.50.001.1406
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.1406 60.50.001.1406
60.50.001.1407
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.1407 60.50.001.1407
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.1407 60.50.001.1407
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.1407 60.50.001.1407
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.1407 60.50.001.1407
60.50.001.3103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.3103 60.50.001.3103
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.3103 60.50.001.310
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.3103 60.50.001.3103
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.3103 60.50.001.3103
60.50.001.3105
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.3105 60.50.001.3105
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.3105 60.50.001.310
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.3105 60.50.001.3105
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.3105 60.50.001.3105
60.50.001.3405
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.3405 60.50.001.3405
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.3405 60.50.001.340
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.3405 60.50.001.3405
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.3405 60.50.001.3405
60.50.001.3406
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.3406 60.50.001.3406
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.3406 60.50.001.340
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.3406 60.50.001.3406
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.3406 60.50.001.3406
60.50.001.3410
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.3410 60.50.001.3410
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.3410 60.50.001.341
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.3410 60.50.001.3410
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.3410 60.50.001.3410
60.50.001.3411
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.3411 60.50.001.3411
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.3411 60.50.001.341
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.3411 60.50.001.3411
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.3411 60.50.001.3411
60.50.001.6102
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6102 60.50.001.610
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6102 60.50.001.610
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6102 60.50.001.610
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6102 60.50.001.610
60.50.001.6104
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6104 60.50.001.6104
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6104 60.50.001.610
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6104 60.50.001.6104
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6104 60.50.001.6104
60.50.001.6305
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6305 60.50.001.6305
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6305 60.50.001.630
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6305 60.50.001.6305
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6305 60.50.001.6305
60.50.001.6306
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6306 60.50.001.6306
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6306 60.50.001.630
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6306 60.50.001.6306
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6306 60.50.001.6306
60.50.001.6307
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6307 60.50.001.6307
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6307 60.50.001.630
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6307 60.50.001.6307
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6307 60.50.001.6307
60.50.001.6309
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6309 60.50.001.6309
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6309 60.50.001.630
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6309 60.50.001.6309
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6309 60.50.001.6309
60.50.001.6312
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6312 60.50.001.6312
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6312 60.50.001.631
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6312 60.50.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6312 60.50.001.631
60.50.001.6313
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6313 60.50.001.6313
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6313 60.50.001.631
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6313 60.50.001.6313
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6313 60.50.001.6313
60.50.001.6314
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6314 60.50.001.6314
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6314 60.50.001.631
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6314 60.50.001.6314
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6314 60.50.001.6314
60.50.001.6315
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6315 60.50.001.631
60.50.001.6409
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6409 60.50.001.640
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6409 60.50.001.640
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6409 60.50.001.640
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6409 60.50.001.640
60.50.001.6410
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6410 60.50.001.641
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6410 60.50.001.641
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6410 60.50.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6410 60.50.001.641
60.50.001.6411
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6411 60.50.001.6411
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6411 60.50.001.641
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6411 60.50.001.6411
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6411 60.50.001.6411
60.50.001.6412
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6412 60.50.001.641
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6412 60.50.001.641
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6412 60.50.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6412 60.50.001.641
60.50.001.6413
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6413 60.50.001.641
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6413 60.50.001.641
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6413 60.50.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6413 60.50.001.641
60.50.001.6414
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6414 60.50.001.641
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6414 60.50.001.641
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6414 60.50.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6414 60.50.001.641
60.50.001.6511
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6511 60.50.001.6511
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6511 60.50.001.651
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6511 60.50.001.6511
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6511 60.50.001.6511
60.50.001.6513
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6513 60.50.001.651
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6513 60.50.001.651
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6513 60.50.001.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6513 60.50.001.651
60.50.001.6514
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6514 60.50.001.651
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6514 60.50.001.651
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6514 60.50.001.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6514 60.50.001.651
60.50.001.7002
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7002 60.50.001.7002
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7002 60.50.001.700
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7002 60.50.001.7002
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7002 60.50.001.7002
60.50.001.7012
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7012 60.50.001.701
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7012 60.50.001.701
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7012 60.50.001.701
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7012 60.50.001.701
60.50.001.7021
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7021 60.50.001.702
60.50.001.7022
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7022 60.50.001.702
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7022 60.50.001.702
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7022 60.50.001.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7022 60.50.001.702
60.50.001.7026
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7026 60.50.001.7026
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7026 60.50.001.702
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7026 60.50.001.7026
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7026 60.50.001.7026
60.50.001.7221
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7221 60.50.001.722
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7221 60.50.001.722
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7221 60.50.001.722
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7221 60.50.001.722
60.50.001.7331
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7331 60.50.001.7331
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7331 60.50.001.733
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7331 60.50.001.7331
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7331 60.50.001.7331
60.50.001.7334
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7334 60.50.001.7334
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7334 60.50.001.733
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7334 60.50.001.7334
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7334 60.50.001.7334
60.50.001.7338
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7338 60.50.001.7338
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7338 60.50.001.733
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7338 60.50.001.7338
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7338 60.50.001.7338
60.50.001.8101
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.8101 60.50.001.8101
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.8101 60.50.001.810
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.8101 60.50.001.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.8101 60.50.001.810
60.50.001.8102
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.8102 60.50.001.8102
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.8102 60.50.001.810
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.8102 60.50.001.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.8102 60.50.001.810
60.50.001.8300
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.8300 60.50.001.8300
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.8300 60.50.001.830
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.8300 60.50.001.8300
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.8300 60.50.001.8300
60.50.001.9114
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.9114 60.50.001.911
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.9114 60.50.001.911
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.9114 60.50.001.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.9114 60.50.001.911
60.60.002.0002
ACCESORIO ELECTRICO SUMINISTRO ACC. ELECTRICO 60.60.002.0002 60.60.002.0002
ACCESORIO ELECTRICO MONTAJE AC. ELECTRICO 60.60.002.0002 60.60.002.000
ACCESORIO ELECTRICO PROTOCOLO AC. ELECTRICO 60.60.002.0002 60.60.002.0002
60.60.002.0004
ACCESORIO ELECTRICO SUMINISTRO ACC. ELECTRICO 60.60.002.0004 60.60.002.0004
ACCESORIO ELECTRICO MONTAJE AC. ELECTRICO 60.60.002.0004 60.60.002.0004
ACCESORIO ELECTRICO PROTOCOLO AC. ELECTRICO 60.60.002.0004 60.60.002.0004
60.60.002.0005
ACCESORIO ELECTRICO SUMINISTRO ACC. ELECTRICO 60.60.002.0005 60.60.002.0005
ACCESORIO ELECTRICO MONTAJE AC. ELECTRICO 60.60.002.0005 60.60.002.0005
ACCESORIO ELECTRICO PROTOCOLO AC. ELECTRICO 60.60.002.0005 60.60.002.0005
60.60.005.0004
LUMINARIA SUMINISTRO LUMINARIA 60.60.005.0004 60.60.005.000
LUMINARIA MONTAJE LUMINARIA 60.60.005.0004 60.60.005.000
LUMINARIA PROTOCOLO LUMINARIA 60.60.005.0004 60.60.005.000
60.60.005.0014
LUMINARIA SUMINISTRO LUMINARIA 60.60.005.0014 60.60.005.0014
LUMINARIA MONTAJE LUMINARIA 60.60.005.0014 60.60.005.001
LUMINARIA PROTOCOLO LUMINARIA 60.60.005.0014 60.60.005.0014
60.60.005.0034
LUMINARIA SUMINISTRO LUMINARIA 60.60.005.0034 60.60.005.0034
LUMINARIA MONTAJE LUMINARIA 60.60.005.0034 60.60.005.003
LUMINARIA PROTOCOLO LUMINARIA 60.60.005.0034 60.60.005.0034
60.60.005.0061
PROYECTOR LED SUMINISTRO PROYECTOR LED60.60.005.0061 60.60.005.006
PROYECTOR LED MONTAJE PROYECTOR LED 60.60.005.0061 60.60.005.006
PROYECTOR LED PROTOCOLO PROYECTOR LED 60.60.005.0061 60.60.005.006
60.60.005.0062
PROYECTOR LED SUMINISTRO PROYECTOR LED60.60.005.0062 60.60.005.006
PROYECTOR LED MONTAJE PROYECTOR LED 60.60.005.0062 60.60.005.006
PROYECTOR LED PROTOCOLO PROYECTOR LED 60.60.005.0062 60.60.005.006
60.60.005.0071
PROYECTOR LED SUMINISTRO PROYECTOR LED60.60.005.0071 60.60.005.007
PROYECTOR LED MONTAJE PROYECTOR LED 60.60.005.0071 60.60.005.007
PROYECTOR LED PROTOCOLO PROYECTOR LED 60.60.005.0071 60.60.005.007
60.60.005.0092
ILUMINACION EMERGESUMINISTRO ILUMINACION E 60.60.005.0092 60.60.005.0092
ILUMINACION EMERGEMONTAJE ILUMINACION EMER60.60.005.0092 60.60.005.0092
ILUMINACION EMERGEPROTOCOLO ILUMINACION E 60.60.005.0092 60.60.005.0092
60.60.005.0202
ILUMINACION EMERGESUMINISTRO ILUMINACION E 60.60.005.0202 60.60.005.0202
ILUMINACION EMERGEMONTAJE ILUMINACION EMER60.60.005.0202 60.60.005.0202
ILUMINACION EMERGEPROTOCOLO ILUMINACION E 60.60.005.0202 60.60.005.0202
60.70.001.0001
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.001.0001 60.70.001.0001
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.001.0001 60.70.001.0001
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.001.0001 60.70.001.0001
60.70.001.0002
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.001.0002 60.70.001.0002
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.001.0002 60.70.001.0002
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.001.0002 60.70.001.0002
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.001.0002 60.70.001.0002
60.70.001.0003
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.001.0003 60.70.001.0003
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.001.0003 60.70.001.0003
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.001.0003 60.70.001.0003
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.001.0003 60.70.001.0003
60.70.001.0004
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.001.0004 60.70.001.0004
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.001.0004 60.70.001.0004
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.001.0004 60.70.001.0004
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.001.0004 60.70.001.0004
60.70.004.0002
PANEL RECEPCION PANEL 60.70.004.0002 60.70.004.0002
PANEL MONTAJE PANEL 60.70.004.0002 60.70.004.0002
PANEL CONEXIONADO PANEL 60.70.004.0002 60.70.004.0002
PANEL PROTOCOLOS PANEL 60.70.004.0002 60.70.004.0002
60.70.004.0003
PANEL RECEPCION PANEL 60.70.004.0003 60.70.004.0003
PANEL MONTAJE PANEL 60.70.004.0003 60.70.004.0003
PANEL CONEXIONADO PANEL 60.70.004.0003 60.70.004.0003
PANEL PROTOCOLOS PANEL 60.70.004.0003 60.70.004.0003
60.70.004.0004
PANEL RECEPCION PANEL 60.70.004.0004 60.70.004.0004
PANEL MONTAJE PANEL 60.70.004.0004 60.70.004.0004
PANEL CONEXIONADO PANEL 60.70.004.0004 60.70.004.0004
PANEL PROTOCOLOS PANEL 60.70.004.0004 60.70.004.0004
60.70.005.0001
SWITCHGEAR SUMINISTRO SWITCHGEAR 60.70.005.0001 60.70.005.0001
SWITCHGEAR MONTAJE SWITCHGEAR 60.70.005.0001 60.70.005.0001
SWITCHGEAR CONEXIONADO SWITCHGEAR 60.70.005.0001 60.70.005.0001
SWITCHGEAR PROTOCOLOS SWITCHGEAR 60.70.005.0001 60.70.005.0001
60.70.005.0004
SWITCHGEAR SUMINISTRO SWITCHGEAR 60.70.005.0004 60.70.005.0004
SWITCHGEAR MONTAJE SWITCHGEAR 60.70.005.0004 60.70.005.0004
SWITCHGEAR CONEXIONADO SWITCHGEAR 60.70.005.0004 60.70.005.0004
SWITCHGEAR PROTOCOLOS SWITCHGEAR 60.70.005.0004 60.70.005.0004
60.70.006.0003
MOTOR CONTROL CENTSUMINISTRO MOTOR CONTROL
60.70.006.0003 60.70.006.0003
MOTOR CONTROL CENTMONTAJE MOTOR CONTROL C60.70.006.0003 60.70.006.0003
MOTOR CONTROL CENTCONEXIONADO MOTOR CONTR60.70.006.0003 60.70.006.0003
MOTOR CONTROL CENTPROTOCOLOS MOTOR CONTRO60.70.006.0003 60.70.006.0003
60.70.006.0005
MOTOR CONTROL CENTSUMINISTRO MOTOR CONTROL
60.70.006.0005 60.70.006.0005
MOTOR CONTROL CENTMONTAJE MOTOR CONTROL C60.70.006.0005 60.70.006.0005
MOTOR CONTROL CENTCONEXIONADO MOTOR CONTR60.70.006.0005 60.70.006.0005
MOTOR CONTROL CENTPROTOCOLOS MOTOR CONTRO60.70.006.0005 60.70.006.0005
60.70.008.0101
BATERIA SUMINISTRO BATERIA 60.70.008.0101 60.70.008.0101
BATERIA MONTAJE BATERIA 60.70.008.0101 60.70.008.0101
BATERIA PROTOCOLO BATERIA 60.70.008.0101 60.70.008.0101
BATERIA PROTOCOLO BATERIA 60.70.008.0101 60.70.008.0101
60.70.009.0002
BATERIA SUMINISTRO BATERIA 60.70.009.0002 60.70.009.0002
BATERIA MONTAJE BATERIA 60.70.009.0002 60.70.009.0002
BATERIA CONEXIONADO BATERIA 60.70.009.0002 60.70.009.0002
BATERIA PROTOCOLO BATERIA 60.70.009.0002 60.70.009.0002
60.70.014.0001
BUSBAR SUMINISTRO BUSBAR 60.70.014.0001 60.70.014.0001
BUSBAR MONTAJE BUSBAR 60.70.014.0001 60.70.014.0001
BUSBAR CONEXIONADO BUSBAR 60.70.014.0001 60.70.014.0001
BUSBAR PROTOCOLO BUSBAR 60.70.014.0001 60.70.014.0001
60.70.020.0000
SALA ELECTRICA INSTALACION SALA ELECTRICA60.70.020.0000 60.70.020.000

00.25.001.0001
EXCAVACION EXCAVACION PARA PUESTA A T00.25.001.0001 00.25.001.000
00.25.001.0002
EXCAVACION EXCAVACION PARA COUNDUIT00.25.001.0002 00.25.001.000
00.30.002.0001
RELLENO RELLENO PARA PUESTA A TIER 00.30.002.0001 00.30.002.000
00.30.002.0002
RELLENO RELLENO PARA CONDUIT 00.30.002.0002 00.30.002.000

10.20.001.0001
PERNO SUMINISTRO Y COLOCACION 10.20.001.0001 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0001 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0001 10.20.001.000
10.20.001.0002
PERNO SUMINISTRO Y COLOCACION 10.20.001.0002 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0002 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0002 10.20.001.000
10.20.001.0101
PERNO SUMINISTRO Y COLOCACION 10.20.001.0101 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0101 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0101 10.20.001.010
10.20.001.0102
PERNO SUMINISTRO Y COLOCACION 10.20.001.0102 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0102 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0102 10.20.001.010
10.20.001.0003
PERNO SUMINISTRO Y COLOCACION 10.20.001.0003 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0003 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0003 10.20.001.000
10.20.001.0004
PERNO SUMINISTRO Y COLOCACION 10.20.001.0004 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0004 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0004 10.20.001.000
10.20.001.0103
PERNO SUMINISTRO Y COLOCACION 10.20.001.0103 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0103 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0103 10.20.001.010
10.20.001.0104
PERNO SUMINISTRO Y COLOCACION 10.20.001.0104 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0104 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0104 10.20.001.010
10.20.002.0001
PERNO SUMINISTRO Y COLOCACION 10.20.002.0001 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0001 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0001 10.20.002.000
10.20.002.0002
PERNO SUMINISTRO Y COLOCACION 10.20.002.0002 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0002 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0002 10.20.002.000
10.40.001.0005
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0005 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0005 10.40.001.000
10.40.001.0009
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0009 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0009 10.40.001.000
10.40.001.0011
ACERO REFUERZO DUR SUMINISTRO DE ACERO REFU 10.40.001.0011 10.40.001.001
ACERO REFUERZO DUR CORTADO ACERO REFUERZO 10.40.001.0011 10.40.001.001
ACERO REFUERZO DUR DOBLADO ACERO REFUERZO 10.40.001.0011 10.40.001.001
ACERO REFUERZO DUR PUNCH LIST ACERO REFUERZO10.40.001.0011 10.40.001.001
10.40.002.2805
CONCRETO COLOCACION ACERO 10.40.002.2805 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2805 10.40.002.280
10.40.002.2809
CONCRETO COLOCACION ACERO 10.40.002.2809 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2809 10.40.002.280
10.40.002.2811
CONCRETO DURMIENTECOLOCACION ACERO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEENCOFRADO CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTETOPOGRAFIA CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEVACIADO CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEDESCIMBRE CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTELIMPIEZA CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEPUNCH LIST CONCRETO 10.40.002.2811 10.40.002.281
10.60.002.1061
SOLADO ENCOFRADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO VACIADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO DESCIMBRE CONCRETO 10.60.002.1061 10.60.002.106
SOLADO LIMPIEZA CONCRETO 10.60.002.1061 10.60.002.106
SOLADO PUNCH LIST CONCRETO 10.60.002.1061 10.60.002.106

40.70.001.2627
CHUTE DESCARGA FAJARECEPCION 40.70.001.2627 40.70.001.262
CHUTE DESCARGA FAJAMONTAJE 40.70.001.2627 40.70.001.262
CHUTE DESCARGA FAJACONEXIONADO 40.70.001.2627 40.70.001.262
CHUTE DESCARGA FAJAPROTOCOLOS 40.70.001.2627 40.70.001.262
40.80.001.201
FAJA SACRIFICIO FLU RECEPCION F. TRANSPORTAD 40.80.001.201 40.80.001.201
FAJA SACRIFICIO FLU MONTAJE EST F. TRANSPORT 40.80.001.201 40.80.001.201
FAJA SACRIFICIO FLU MONTAJE MEC F. TRANSPOR 40.80.001.201 40.80.001.201
FAJA SACRIFICIO FLU MONTAJE CHUTES F. TRANSP 40.80.001.201 40.80.001.201
FAJA SACRIFICIO FLU CONEXIONADO F. TRANSPOR 40.80.001.201 40.80.001.201
FAJA SACRIFICIO FLU PROTOCOLOS F. TRANSPORT 40.80.001.201 40.80.001.201
40.80.001.202
GALERIAS FAJA SACRIFIRECEPCION F. TRANSPORTAD 40.80.001.202 40.80.001.202
GALERIAS FAJA SACRIFIMONTAJE EST F. TRANSPORT 40.80.001.202 40.80.001.202
GALERIAS FAJA SACRIFIMONTAJE MEC F. TRANSPOR 40.80.001.202 40.80.001.202
GALERIAS FAJA SACRIFIMONTAJE CHUTES F. TRANSP 40.80.001.202 40.80.001.202
GALERIAS FAJA SACRIFICONEXIONADO F. TRANSPOR 40.80.001.202 40.80.001.202
GALERIAS FAJA SACRIFIPROTOCOLOS F. TRANSPORT 40.80.001.202 40.80.001.202
40.80.001.203
MESA IMPACTO FAJA SARECEPCION F. TRANSPORTAD 40.80.001.203 40.80.001.203
MESA IMPACTO FAJA SAMONTAJE EST F. TRANSPORT 40.80.001.203 40.80.001.203
MESA IMPACTO FAJA SAMONTAJE MEC F. TRANSPOR 40.80.001.203 40.80.001.203
MESA IMPACTO FAJA SAMONTAJE CHUTES F. TRANSP 40.80.001.203 40.80.001.203
MESA IMPACTO FAJA SACONEXIONADO F. TRANSPOR 40.80.001.203 40.80.001.203
MESA IMPACTO FAJA SAPROTOCOLOS F. TRANSPORT 40.80.001.203 40.80.001.203
40.80.001.204
MESA DE CARGA FAJA SRECEPCION F. TRANSPORTAD 40.80.001.204 40.80.001.204
MESA DE CARGA FAJA SMONTAJE EST F. TRANSPORT 40.80.001.204 40.80.001.204
MESA DE CARGA FAJA SMONTAJE MEC F. TRANSPOR 40.80.001.204 40.80.001.204
MESA DE CARGA FAJA SMONTAJE CHUTES F. TRANSP 40.80.001.204 40.80.001.204
MESA DE CARGA FAJA SCONEXIONADO F. TRANSPOR 40.80.001.204 40.80.001.204
MESA DE CARGA FAJA SPROTOCOLOS F. TRANSPORT 40.80.001.204 40.80.001.204
40.80.001.205
TAIL ASSEMBLY FAJA SARECEPCION F. TRANSPORTAD 40.80.001.205 40.80.001.205
TAIL ASSEMBLY FAJA SAMONTAJE EST F. TRANSPORT 40.80.001.205 40.80.001.205
TAIL ASSEMBLY FAJA SAMONTAJE MEC F. TRANSPOR 40.80.001.205 40.80.001.205
TAIL ASSEMBLY FAJA SAMONTAJE CHUTES F. TRANSP 40.80.001.205 40.80.001.205
TAIL ASSEMBLY FAJA SACONEXIONADO F. TRANSPOR 40.80.001.205 40.80.001.205
TAIL ASSEMBLY FAJA SAPROTOCOLOS F. TRANSPORT 40.80.001.205 40.80.001.205
40.80.001.206
MISCELANEOS TAKE UPRECEPCION F. TRANSPORTAD 40.80.001.206 40.80.001.206
MISCELANEOS TAKE UPMONTAJE EST F. TRANSPORT 40.80.001.206 40.80.001.206
MISCELANEOS TAKE UPMONTAJE MEC F. TRANSPOR 40.80.001.206 40.80.001.206
MISCELANEOS TAKE UPMONTAJE CHUTES F. TRANSP 40.80.001.206 40.80.001.206
MISCELANEOS TAKE UPCONEXIONADO F. TRANSPOR 40.80.001.206 40.80.001.206
MISCELANEOS TAKE UPPROTOCOLOS F. TRANSPORT 40.80.001.206 40.80.001.206
40.80.001.207
MISCELANEOS COUNTER
RECEPCION F. TRANSPORTAD 40.80.001.207 40.80.001.207
MISCELANEOS COUNTER
MONTAJE EST F. TRANSPORT 40.80.001.207 40.80.001.207
MISCELANEOS COUNTER
MONTAJE MEC F. TRANSPOR 40.80.001.207 40.80.001.207
MISCELANEOS COUNTER
MONTAJE CHUTES F. TRANSP 40.80.001.207 40.80.001.207
MISCELANEOS COUNTER
CONEXIONADO F. TRANSPOR 40.80.001.207 40.80.001.207
MISCELANEOS COUNTER
PROTOCOLOS F. TRANSPORT 40.80.001.207 40.80.001.207
40.80.001.208
MISCELANEOS FAJA SACRECEPCION F. TRANSPORTAD 40.80.001.208 40.80.001.208
MISCELANEOS FAJA SACMONTAJE EST F. TRANSPORT 40.80.001.208 40.80.001.208
MISCELANEOS FAJA SACMONTAJE MEC F. TRANSPOR 40.80.001.208 40.80.001.208
MISCELANEOS FAJA SACMONTAJE CHUTES F. TRANSP 40.80.001.208 40.80.001.208
MISCELANEOS FAJA SACCONEXIONADO F. TRANSPOR 40.80.001.208 40.80.001.208
MISCELANEOS FAJA SACPROTOCOLOS F. TRANSPORT 40.80.001.208 40.80.001.208
40.80.001.209
REDUCTOR FAJA DE SACRECEPCION F. TRANSPORTAD 40.80.001.209 40.80.001.209
REDUCTOR FAJA DE SACMONTAJE EST F. TRANSPORT 40.80.001.209 40.80.001.209
REDUCTOR FAJA DE SACMONTAJE MEC F. TRANSPOR 40.80.001.209 40.80.001.209
REDUCTOR FAJA DE SACMONTAJE CHUTES F. TRANSP 40.80.001.209 40.80.001.209
REDUCTOR FAJA DE SACCONEXIONADO F. TRANSPOR 40.80.001.209 40.80.001.209
REDUCTOR FAJA DE SACPROTOCOLOS F. TRANSPORT 40.80.001.209 40.80.001.209
40.80.001.210
MOTOR VENTILADOR UNI
RECEPCION F. TRANSPORTAD 40.80.001.210 40.80.001.210
MOTOR VENTILADOR UNI
MONTAJE EST F. TRANSPORT 40.80.001.210 40.80.001.210
MOTOR VENTILADOR UNI
MONTAJE MEC F. TRANSPOR 40.80.001.210 40.80.001.210
MOTOR VENTILADOR UNI
MONTAJE CHUTES F. TRANSP 40.80.001.210 40.80.001.210
MOTOR VENTILADOR UNI
CONEXIONADO F. TRANSPOR 40.80.001.210 40.80.001.210
MOTOR VENTILADOR UNI
PROTOCOLOS F. TRANSPORT 40.80.001.210 40.80.001.210
40.80.001.211
CALEFACTOR UNIDAD MO
RECEPCION F. TRANSPORTAD 40.80.001.211 40.80.001.211
CALEFACTOR UNIDAD MO
MONTAJE EST F. TRANSPORT 40.80.001.211 40.80.001.211
CALEFACTOR UNIDAD MO
MONTAJE MEC F. TRANSPOR 40.80.001.211 40.80.001.211
CALEFACTOR UNIDAD MO
MONTAJE CHUTES F. TRANSP 40.80.001.211 40.80.001.211
CALEFACTOR UNIDAD MO
CONEXIONADO F. TRANSPOR 40.80.001.211 40.80.001.211
CALEFACTOR UNIDAD MO
PROTOCOLOS F. TRANSPORT 40.80.001.211 40.80.001.211
40.80.001.212
MOTOR BOMBA UNIDAD
RECEPCION F. TRANSPORTAD 40.80.001.212 40.80.001.212
MOTOR BOMBA UNIDAD
MONTAJE EST F. TRANSPORT 40.80.001.212 40.80.001.212
MOTOR BOMBA UNIDAD
MONTAJE MEC F. TRANSPOR 40.80.001.212 40.80.001.212
MOTOR BOMBA UNIDAD
MONTAJE CHUTES F. TRANSP 40.80.001.212 40.80.001.212
MOTOR BOMBA UNIDAD
CONEXIONADO F. TRANSPOR 40.80.001.212 40.80.001.212
MOTOR BOMBA UNIDAD
PROTOCOLOS F. TRANSPORT 40.80.001.212 40.80.001.212
40.80.001.213
DETECTOR METALES FAJRECEPCION F. TRANSPORTAD 40.80.001.213 40.80.001.213
DETECTOR METALES FAJMONTAJE EST F. TRANSPORT 40.80.001.213 40.80.001.213
DETECTOR METALES FAJMONTAJE MEC F. TRANSPOR 40.80.001.213 40.80.001.213
DETECTOR METALES FAJMONTAJE CHUTES F. TRANSP 40.80.001.213 40.80.001.213
DETECTOR METALES FAJCONEXIONADO F. TRANSPOR 40.80.001.213 40.80.001.213
DETECTOR METALES FAJPROTOCOLOS F. TRANSPORT 40.80.001.213 40.80.001.213
40.80.001.214
MOTOR ELECTRICO FAJRECEPCION F. TRANSPORTAD 40.80.001.214 40.80.001.214
MOTOR ELECTRICO FAJMONTAJE EST F. TRANSPORT 40.80.001.214 40.80.001.214
MOTOR ELECTRICO FAJMONTAJE MEC F. TRANSPOR 40.80.001.214 40.80.001.214
MOTOR ELECTRICO FAJMONTAJE CHUTES F. TRANSP 40.80.001.214 40.80.001.214
MOTOR ELECTRICO FAJCONEXIONADO F. TRANSPOR 40.80.001.214 40.80.001.214
MOTOR ELECTRICO FAJPROTOCOLOS F. TRANSPORT 40.80.001.214 40.80.001.214
40.80.001.215
MOTOR CREEP DRIVE FAJ
RECEPCION F. TRANSPORTAD 40.80.001.215 40.80.001.215
MOTOR CREEP DRIVE FAJ
MONTAJE EST F. TRANSPORT 40.80.001.215 40.80.001.215
MOTOR CREEP DRIVE FAJ
MONTAJE MEC F. TRANSPOR 40.80.001.215 40.80.001.215
MOTOR CREEP DRIVE FAJ
MONTAJE CHUTES F. TRANSP 40.80.001.215 40.80.001.215
MOTOR CREEP DRIVE FAJ
CONEXIONADO F. TRANSPOR 40.80.001.215 40.80.001.215
MOTOR CREEP DRIVE FAJ
PROTOCOLOS F. TRANSPORT 40.80.001.215 40.80.001.215
40.80.001.216
TORRE DE TRANSFERENC
RECEPCION F. TRANSPORTAD 40.80.001.216 40.80.001.216
TORRE DE TRANSFERENC
MONTAJE EST F. TRANSPORT 40.80.001.216 40.80.001.216
TORRE DE TRANSFERENC
MONTAJE MEC F. TRANSPOR 40.80.001.216 40.80.001.216
TORRE DE TRANSFERENC
MONTAJE CHUTES F. TRANSP 40.80.001.216 40.80.001.216
TORRE DE TRANSFERENC
CONEXIONADO F. TRANSPOR 40.80.001.216 40.80.001.216
TORRE DE TRANSFERENC
PROTOCOLOS F. TRANSPORT 40.80.001.216 40.80.001.216
40.80.001.3204
ELECTRIC HOIST CHUTE RECEPCION 40.80.001.3204 40.80.001.3204
ELECTRIC HOIST CHUTE MONTAJE 40.80.001.3204 40.80.001.3204
ELECTRIC HOIST CHUTE CONEXIONADO 40.80.001.3204 40.80.001.3204
ELECTRIC HOIST CHUTE PROTOCOLOS 40.80.001.3204 40.80.001.3204

51.20.001.0002
FABRICACION DE TUBERFABRICACION DE TUBERIAS R51.20.001.0002 51.20.001.000
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0002 51.20.001.000
51.20.001.0005
FABRICACION DE TUBERFABRICACION DE TUBERIAS R51.20.001.0005 51.20.001.000
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0005 51.20.001.000
51.20.001.0008
INSTALACION DE TUBERFABRICACION DE TUBERIAS R51.20.001.0008 51.20.001.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0008 51.20.001.000
51.20.001.0011
INSTALACION DE TUBERFABRICACION DE TUBERIAS R51.20.001.0011 51.20.001.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0011 51.20.001.001
51.20.002.0001
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0001 51.20.002.0001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0001 51.20.002.0001
51.20.002.0007
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0007 51.20.002.0007
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0007 51.20.002.0007
51.20.002.0014
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0014 51.20.002.0014
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0014 51.20.002.0014
51.20.002.0023
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0023 51.20.002.0023
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0023 51.20.002.0023
51.20.002.0032
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0032 51.20.002.0032
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0032 51.20.002.0032
51.20.002.0033
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0033 51.20.002.0033
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0033 51.20.002.0033
51.20.002.0034
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0034 51.20.002.003
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0034 51.20.002.003
51.20.002.0044
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0044 51.20.002.0044
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0044 51.20.002.0044
51.20.002.0046
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0046 51.20.002.0046
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0046 51.20.002.0046
51.30.001.0015
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0015 51.30.001.0015
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0015 51.30.001.0015
51.30.001.0016
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0016 51.30.001.001
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0016 51.30.001.0016
51.40.001.0011
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0011 51.40.001.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0011 51.40.001.001
51.40.001.0019
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0019 51.40.001.0019
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0019 51.40.001.0019
51.40.001.0020
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0020 51.40.001.0020
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0020 51.40.001.0020
51.40.001.0024
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0024 51.40.001.0024
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0024 51.40.001.0024
51.40.007.0002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0002 51.40.007.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0002 51.40.007.000
51.40.007.0005
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0005 51.40.007.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0005 51.40.007.000
51.40.007.0011
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0011 51.40.007.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0011 51.40.007.001
51.40.007.0024
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0024 51.40.007.002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0024 51.40.007.002
51.60.101.0015
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0015 51.60.101.0015
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0015 51.60.101.0015
51.60.101.0017
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0017 51.60.101.0017
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0017 51.60.101.0017
51.60.101.0018
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0018 51.60.101.0018
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0018 51.60.101.0018
51.60.101.0019
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0019 51.60.101.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0019 51.60.101.001
51.60.101.0020
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0020 51.60.101.0020
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0020 51.60.101.0020
51.60.101.0021
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0021 51.60.101.0021
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0021 51.60.101.0021
52.20.001.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0002 52.20.001.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0002 52.20.001.0002
52.20.001.0005
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0005 52.20.001.0005
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0005 52.20.001.0005
52.20.001.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0012 52.20.001.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0012 52.20.001.0012
52.20.001.0025
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0025 52.20.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0025 52.20.001.002
52.20.003.0019
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0019 52.20.003.0019
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0019 52.20.003.0019
52.20.003.0048
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0048 52.20.003.0048
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0048 52.20.003.0048
52.20.003.0054
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0054 52.20.003.0054
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0054 52.20.003.0054
52.20.003.0065
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0065 52.20.003.0065
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0065 52.20.003.0065
52.20.003.0068
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0068 52.20.003.0068
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0068 52.20.003.0068
52.20.003.0072
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0072 52.20.003.0072
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0072 52.20.003.0072
52.20.003.0081
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0081 52.20.003.0081
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0081 52.20.003.0081
52.20.003.0083
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0083 52.20.003.0083
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0083 52.20.003.0083
52.20.003.0084
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0084 52.20.003.0084
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0084 52.20.003.0084
52.20.003.0089
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0089 52.20.003.0089
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0089 52.20.003.0089
52.20.003.0095
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0095 52.20.003.0095
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0095 52.20.003.0095
52.30.001.0015
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0015 52.30.001.0015
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0015 52.30.001.0015
52.30.001.0016
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0016 52.30.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0016 52.30.001.001
52.40.006.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0002 52.40.006.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0002 52.40.006.0002
52.40.006.0005
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0005 52.40.006.0005
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0005 52.40.006.0005
52.40.006.0011
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0011 52.40.006.0011
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0011 52.40.006.0011
52.40.006.0024
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0024 52.40.006.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0024 52.40.006.002
52.40.006.0024

70.20.001.0001
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0001 70.20.001.0001
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0001 70.20.001.0001
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0001 70.20.001.0001
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0001 70.20.001.0001
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0001 70.20.001.0001
70.20.001.0016
INDICADOR RECEPCION INDICADOR 70.20.001.0016 70.20.001.0016
INDICADOR MONTAJE INDICADOR 70.20.001.0016 70.20.001.0016
INDICADOR CONEXIONADO INDICADOR 70.20.001.0016 70.20.001.0016
INDICADOR CONTRASTACION INDICADOR 70.20.001.0016 70.20.001.0016
INDICADOR PROTOCOLOS INDICADOR 70.20.001.0016 70.20.001.0016
70.20.001.0020
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0020 70.20.001.0020
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0020 70.20.001.0020
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0020 70.20.001.0020
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0020 70.20.001.0020
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0020 70.20.001.0020
70.20.001.0031
SENSOR RECEPCION SENSOR 70.20.001.0031 70.20.001.0031
SENSOR MONTAJE SENSOR 70.20.001.0031 70.20.001.0031
SENSOR CONEXIONADO SENSOR 70.20.001.0031 70.20.001.0031
SENSOR CONTRASTACION SENSOR 70.20.001.0031 70.20.001.0031
SENSOR PROTOCOLOS SENSOR 70.20.001.0031 70.20.001.0031
70.20.001.0032
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0032 70.20.001.0032
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0032 70.20.001.0032
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0032 70.20.001.0032
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0032 70.20.001.0032
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0032 70.20.001.0032
70.20.001.0038
SIRENA RECEPCION SIRENA 70.20.001.0038 70.20.001.0038
SIRENA MONTAJE SIRENA 70.20.001.0038 70.20.001.0038
SIRENA CONEXIONADO SIRENA 70.20.001.0038 70.20.001.0038
SIRENA CONTRASTACION SIRENA 70.20.001.0038 70.20.001.0038
SIRENA PROTOCOLOS SIRENA 70.20.001.0038 70.20.001.0038
70.20.001.0039
BALIZA RECEPCION BALIZA 70.20.001.0039 70.20.001.0039
BALIZA MONTAJE BALIZA 70.20.001.0039 70.20.001.0039
BALIZA CONEXIONADO BALIZA 70.20.001.0039 70.20.001.0039
BALIZA CONTRASTACION BALIZA 70.20.001.0039 70.20.001.0039
BALIZA PROTOCOLO BALIZA 70.20.001.0039 70.20.001.0039
70.20.001.0040
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0040 70.20.001.0040
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0040 70.20.001.0040
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0040 70.20.001.0040
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0040 70.20.001.0040
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0040 70.20.001.0040
70.20.001.0041
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0041 70.20.001.0041
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0041 70.20.001.0041
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0041 70.20.001.0041
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0041 70.20.001.0041
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0041 70.20.001.0041
70.20.001.0042
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0042 70.20.001.0042
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0042 70.20.001.0042
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0042 70.20.001.0042
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0042 70.20.001.0042
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0042 70.20.001.0042
70.20.001.0044
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0044 70.20.001.0044
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0044 70.20.001.004
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0044 70.20.001.004
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0044 70.20.001.004
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0044 70.20.001.0044
70.20.001.0049
SENSOR RECEPCION SENSOR 70.20.001.0049 70.20.001.0049
SENSOR MONTAJE SENSOR 70.20.001.0049 70.20.001.0049
SENSOR CONEXIONADO SENSOR 70.20.001.0049 70.20.001.0049
SENSOR CONTRASTACION SENSOR 70.20.001.0049 70.20.001.0049
SENSOR PROTOCOLOS SENSOR 70.20.001.0049 70.20.001.0049
70.20.001.0050
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0050 70.20.001.0050
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0050 70.20.001.0050
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0050 70.20.001.0050
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0050 70.20.001.0050
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0050 70.20.001.0050
70.20.001.0052
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0052 70.20.001.0052
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0052 70.20.001.0052
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0052 70.20.001.0052
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0052 70.20.001.0052
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0052 70.20.001.0052
70.20.001.00X3
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.00X3 70.20.001.00X3
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.00X3 70.20.001.00X3
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.00X3 70.20.001.00X3
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.00X3 70.20.001.00X3
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.00X3 70.20.001.00X3
70.20.003.0001
ANALIZADOR RECEPCION ANALIZADOR 70.20.003.0001 70.20.003.0001
ANALIZADOR MONTAJE ANALIZADOR 70.20.003.0001 70.20.003.0001
ANALIZADOR CONEXIONADO ANALIZADOR 70.20.003.0001 70.20.003.0001
ANALIZADOR CONTRASTACION ANALIZADO70.20.003.0001 70.20.003.0001
ANALIZADOR PROTOCOLO ANALIZADOR 70.20.003.0001 70.20.003.0001
70.20.003.0002
UNIDAD DE COMUNICARECEPCION UNIDAD COMUNI70.20.003.0002 70.20.003.0002
UNIDAD DE COMUNICAMONTAJE UNIDAD COMUNIC70.20.003.0002 70.20.003.0002
UNIDAD DE COMUNICACONEXIONADO UNIDAD COM70.20.003.0002 70.20.003.0002
UNIDAD DE COMUNICACONTRASTACION UNIDAD C 70.20.003.0002 70.20.003.0002
UNIDAD DE COMUNICAPROTOCOLOS UNIDAD COMUN70.20.003.0002 70.20.003.0002
70.20.003.0003
ILUMINACION RECEPCION ILUMINACION 70.20.003.0003 70.20.003.0003
ILUMINACION MONTAJE ILUMINACION 70.20.003.0003 70.20.003.0003
ILUMINACION CONEXIONADO ILUMINACION70.20.003.0003 70.20.003.0003
ILUMINACION CONTRASTACIONILUMINACIO70.20.003.0003 70.20.003.0003
ILUMINACION PROTOCOLOSILUMINACION 70.20.003.0003 70.20.003.0003
70.20.003.0011
TRANSMISOR RECEPCION TRANSMISOR 70.20.003.0011 70.20.003.0011
TRANSMISOR MONTAJE TRANSMISOR 70.20.003.0011 70.20.003.0011
TRANSMISOR CONEXIONADO TRANSMISOR70.20.003.0011 70.20.003.0011
TRANSMISOR CONTRASTACION TRANSMISO70.20.003.0011 70.20.003.0011
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.003.0011 70.20.003.0011
70.20.005.0001
PANEL RECEPCION INSTRUMENTOS 70.20.005.0001 70.20.005.0001
PANEL MONTAJE INSTRUMENTOS 70.20.005.0001 70.20.005.000
PANEL CONEXIONADO INSTRUMENTO70.20.005.0001 70.20.005.000
PANEL CONTRASTACION INSTRUMEN70.20.005.0001 70.20.005.000
PANEL PROTOCOLOS INSTRUMENTOS70.20.005.0001 70.20.005.0001
70.20.007.0001
UNIDAD HIDRAULICA RECEPCION UNIDAD HIDRAULI70.20.007.0001 70.20.007.0001
UNIDAD HIDRAULICA MONTAJE UNIDAD HIDRAULIC70.20.007.0001 70.20.007.0001
UNIDAD HIDRAULICA CONEXIONADO UNIDAD HIDRA70.20.007.0001 70.20.007.0001
UNIDAD HIDRAULICA CONTRASTACION UNIDAD HID70.20.007.0001 70.20.007.0001
UNIDAD HIDRAULICA PROTOCOLOS UNIDAD HIDRAU70.20.007.0001 70.20.007.0001
70.20.008.0005
PLACA DE MONTAJE RECEPCION PLACAS DE MONTA
70.20.008.0005 70.20.008.0005
PLACA DE MONTAJE MONTAJE PLACAS DE MONTAJ70.20.008.0005 70.20.008.0005
PLACA DE MONTAJE CONEXIONADO PLACAS DE MO70.20.008.0005 70.20.008.0005
PLACA DE MONTAJE CONTRASTACION PLACAS DE 70.20.008.0005 70.20.008.0005
PLACA DE MONTAJE PROTOCOLOS PLACA DE MONT70.20.008.0005 70.20.008.0005

40.70.001.3009
COMPRESOR RECEPCION COMPRESOR 40.70.001.3009 40.70.001.300
COMPRESOR MONTAJE COMPRESOR 40.70.001.3009 40.70.001.3009
COMPRESOR MONTAJE COMPRESOR 40.70.001.3009 40.70.001.3009
COMPRESOR CONEXIONADO COMPRESOR 40.70.001.3009 40.70.001.3009
COMPRESOR PROTOCOLOS COMPRESOR 40.70.001.3009 40.70.001.300
40.70.001.3010
MOTOR ELECTRICO RECEPCION MOTOR ELECTRIC 40.70.001.3010 40.70.001.301
MOTOR ELECTRICO MONTAJE COMPRESORES 40.70.001.3010 40.70.001.3010
MOTOR ELECTRICO MONTAJE ACUMULADORES 40.70.001.3010 40.70.001.3010
MOTOR ELECTRICO CONEXIONADO MOTOR ELECT40.70.001.3010 40.70.001.3010
MOTOR ELECTRICO PROTOCOLOS MOTOR ELECTRI40.70.001.3010 40.70.001.301
40.30.001.5001
VENTILACION RECEPCION VENTILADOR 40.30.001.5001 40.30.001.500
VENTILACION MONTAJE VENTILADOR 40.30.001.5001 40.30.001.5001
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5001 40.30.001.5001
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5001 40.30.001.5001
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5001 40.30.001.500
40.30.001.5005
VENTILACION RECEPCION VENTILADOR 40.30.001.5005 40.30.001.500
VENTILACION MONTAJE VENTILADOR 40.30.001.5005 40.30.001.5005
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5005 40.30.001.5005
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5005 40.30.001.5005
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5005 40.30.001.500
40.30.001.5006
VENTILACION RECEPCION VENTILADOR 40.30.001.5006 40.30.001.500
VENTILACION MONTAJE VENTILADOR 40.30.001.5006 40.30.001.5006
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5006 40.30.001.5006
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5006 40.30.001.5006
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5006 40.30.001.500
40.30.001.5007
VENTILACION RECEPCION VENTILADOR 40.30.001.5007 40.30.001.500
VENTILACION MONTAJE VENTILADOR 40.30.001.5007 40.30.001.5007
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5007 40.30.001.5007
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5007 40.30.001.5007
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5007 40.30.001.500
40.30.001.5008
VENTILACION RECEPCION VENTILADOR 40.30.001.5008 40.30.001.500
VENTILACION MONTAJE VENTILADOR 40.30.001.5008 40.30.001.5008
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5008 40.30.001.5008
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5008 40.30.001.5008
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5008 40.30.001.500
40.30.001.5009
VENTILACION RECEPCION VENTILADOR 40.30.001.5009 40.30.001.500
VENTILACION MONTAJE VENTILADOR 40.30.001.5009 40.30.001.5009
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5009 40.30.001.5009
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5009 40.30.001.5009
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5009 40.30.001.500
40.30.001.5010
VENTILACION RECEPCION VENTILADOR 40.30.001.5010 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5010 40.30.001.5010
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5010 40.30.001.5010
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5010 40.30.001.5010
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5010 40.30.001.501
40.30.001.5011
VENTILACION RECEPCION VENTILADOR 40.30.001.5011 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5011 40.30.001.5011
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5011 40.30.001.5011
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5011 40.30.001.5011
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5011 40.30.001.501
40.30.001.5012
VENTILACION RECEPCION VENTILADOR 40.30.001.5012 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5012 40.30.001.5012
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5012 40.30.001.5012
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5012 40.30.001.5012
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5012 40.30.001.501
40.30.001.5013
VENTILACION RECEPCION VENTILADOR 40.30.001.5013 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5013 40.30.001.5013
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5013 40.30.001.5013
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5013 40.30.001.5013
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5013 40.30.001.501
40.30.001.5014
VENTILACION RECEPCION VENTILADOR 40.30.001.5014 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5014 40.30.001.5014
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5014 40.30.001.5014
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5014 40.30.001.5014
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5014 40.30.001.501
40.30.001.5015
VENTILACION RECEPCION VENTILADOR 40.30.001.5015 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5015 40.30.001.5015
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5015 40.30.001.5015
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5015 40.30.001.5015
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5015 40.30.001.501
40.30.001.5022
VENTILACION RECEPCION VENTILADOR 40.30.001.5022 40.30.001.502
VENTILACION MONTAJE VENTILADOR 40.30.001.5022 40.30.001.5022
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5022 40.30.001.5022
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5022 40.30.001.5022
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5022 40.30.001.502
40.30.001.5023
VENTILACION RECEPCION VENTILADOR 40.30.001.5023 40.30.001.502
VENTILACION MONTAJE VENTILADOR 40.30.001.5023 40.30.001.5023
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5023 40.30.001.5023
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5023 40.30.001.5023
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5023 40.30.001.502
40.30.001.5024
VENTILACION RECEPCION VENTILADOR 40.30.001.5024 40.30.001.502
VENTILACION MONTAJE VENTILADOR 40.30.001.5024 40.30.001.5024
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5024 40.30.001.5024
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5024 40.30.001.5024
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5024 40.30.001.502
40.30.001.5025
VENTILACION RECEPCION VENTILADOR 40.30.001.5025 40.30.001.502
VENTILACION MONTAJE VENTILADOR 40.30.001.5025 40.30.001.5025
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5025 40.30.001.5025
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5025 40.30.001.5025
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5025 40.30.001.502
40.30.001.5026
VENTILACION RECEPCION VENTILADOR 40.30.001.5026 40.30.001.502
VENTILACION MONTAJE VENTILADOR 40.30.001.5026 40.30.001.5026
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5026 40.30.001.5026
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5026 40.30.001.5026
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5026 40.30.001.502
40.30.001.5027
VENTILACION RECEPCION VENTILADOR 40.30.001.5027 40.30.001.502
VENTILACION MONTAJE VENTILADOR 40.30.001.5027 40.30.001.5027
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5027 40.30.001.5027
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5027 40.30.001.5027
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5027 40.30.001.502
40.30.001.5028
VENTILACION RECEPCION VENTILADOR 40.30.001.5028 40.30.001.502
VENTILACION MONTAJE VENTILADOR 40.30.001.5028 40.30.001.5028
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5028 40.30.001.5028
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5028 40.30.001.5028
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5028 40.30.001.502
40.30.001.5029
VENTILACION RECEPCION VENTILADOR 40.30.001.5029 40.30.001.502
VENTILACION MONTAJE VENTILADOR 40.30.001.5029 40.30.001.5029
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5029 40.30.001.5029
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5029 40.30.001.5029
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5029 40.30.001.502
40.30.001.5030
VENTILACION RECEPCION VENTILADOR 40.30.001.5030 40.30.001.503
VENTILACION MONTAJE VENTILADOR 40.30.001.5030 40.30.001.5030
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5030 40.30.001.5030
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5030 40.30.001.5030
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5030 40.30.001.503
40.30.001.5031
VENTILACION RECEPCION VENTILADOR 40.30.001.5031 40.30.001.503
VENTILACION MONTAJE VENTILADOR 40.30.001.5031 40.30.001.5031
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5031 40.30.001.5031
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5031 40.30.001.5031
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5031 40.30.001.503
40.30.001.5032
VENTILACION RECEPCION VENTILADOR 40.30.001.5032 40.30.001.503
VENTILACION MONTAJE VENTILADOR 40.30.001.5032 40.30.001.5032
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5032 40.30.001.5032
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5032 40.30.001.5032
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5032 40.30.001.503
40.30.001.5033
VENTILACION RECEPCION VENTILADOR 40.30.001.5033 40.30.001.503
VENTILACION MONTAJE VENTILADOR 40.30.001.5033 40.30.001.5033
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5033 40.30.001.5033
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5033 40.30.001.5033
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5033 40.30.001.503

51.40.001.0009
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0009 51.40.001.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0009 51.40.001.000
51.40.001.0018
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0018 51.40.001.0018
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0018 51.40.001.0018
51.40.001.0025
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0025 51.40.001.0025
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0025 51.40.001.0025
51.40.007.0023
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0023 51.40.007.002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0023 51.40.007.002
51.60.101.0001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0001 51.60.101.0001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0001 51.60.101.0001
51.60.101.0002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0002 51.60.101.0002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0002 51.60.101.0002
51.60.101.0004
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0004 51.60.101.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0004 51.60.101.000
51.60.101.0005
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0005 51.60.101.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0005 51.60.101.000
51.60.101.0006
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0006 51.60.101.0006
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0006 51.60.101.0006
51.60.101.0007
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0007 51.60.101.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0007 51.60.101.000
51.60.101.0013
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0013 51.60.101.0013
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0013 51.60.101.0013
51.60.101.0017
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0017 51.60.101.0017
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0017 51.60.101.0017
51.60.101.0019
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0019 51.60.101.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0019 51.60.101.001
51.60.101.0020
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0020 51.60.101.002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0020 51.60.101.002
51.60.101.0021
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0021 51.60.101.0021
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0021 51.60.101.0021
52.20.001.0024
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.001.0024 52.20.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0024 52.20.001.002
52.20.003.0055
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0055 52.20.003.005
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0055 52.20.003.005
52.20.003.0059
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0059 52.20.003.005
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0059 52.20.003.005
52.20.003.0068
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0068 52.20.003.0068
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0068 52.20.003.0068
52.20.003.0071
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0071 52.20.003.0071
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0071 52.20.003.0071
52.20.003.0076
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0076 52.20.003.007
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0076 52.20.003.007
52.20.003.0082
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0082 52.20.003.0082
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0082 52.20.003.0082
52.40.006.0023
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0023 52.40.006.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0023 52.40.006.002

60.20.002.0002
CONDUIT SUMINISTRO CONDUIT 60.20.002.0002 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0002 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0002 60.20.002.000
60.20.002.0005
CONDUIT SUMINISTRO CONDUIT 60.20.002.0005 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0005 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0005 60.20.002.000
60.20.002.0032
CONDUIT SUMINISTRO CONDUIT 60.20.002.0032 60.20.002.003
CONDUIT MONTAJE CONDUIT 60.20.002.0032 60.20.002.003
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0032 60.20.002.003
60.30.002.6312
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6312 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6312 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6312 60.30.002.631
60.30.002.6314
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6314 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6314 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6314 60.30.002.631
60.30.002.6315
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6315 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6315 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6315 60.30.002.631
60.30.002.7021
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7021 60.30.002.702
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7021 60.30.002.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7021 60.30.002.702
60.30.002.7022
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7022 60.30.002.702
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7022 60.30.002.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7022 60.30.002.702
60.30.002.7221
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7221 60.30.002.722
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7221 60.30.002.722
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7221 60.30.002.722
60.30.002.7331
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7331 60.30.002.733
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7331 60.30.002.733
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7331 60.30.002.733
60.30.002.8101
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8101 60.30.002.810
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8101 60.30.002.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8101 60.30.002.810
60.30.002.8102
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8102 60.30.002.810
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8102 60.30.002.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8102 60.30.002.810
60.30.002.9113
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.9113 60.30.002.911
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.9113 60.30.002.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.9113 60.30.002.911
60.30.002.9114
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.9114 60.30.002.911
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.9114 60.30.002.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.9114 60.30.002.911
60.30.003.0001
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.003.0001 60.30.003.000
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.003.0001 60.30.003.000
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.003.0001 60.30.003.000
60.40.001.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0001 60.40.001.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0001 60.40.001.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0001 60.40.001.000
60.40.001.0002
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0002 60.40.001.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0002 60.40.001.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0002 60.40.001.000
60.40.002.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0001 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0001 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0001 60.40.002.000
60.40.002.0002
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0002 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0002 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0002 60.40.002.000
60.40.002.0003
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0003 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0003 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0003 60.40.002.000
60.40.005.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.005.0001 60.40.005.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.005.0001 60.40.005.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.005.0001 60.40.005.000
60.50.001.1405
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.1405 60.50.001.1405
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.1405 60.50.001.140
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.1405 60.50.001.1405
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.1405 60.50.001.1405
60.50.001.6306
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6306 60.50.001.630
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6306 60.50.001.630
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6306 60.50.001.6306
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6306 60.50.001.6306
60.50.001.6315
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6315 60.50.001.6315
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6315 60.50.001.6315
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6315 60.50.001.631
60.50.001.7021
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7021 60.50.001.702
60.50.001.7334
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7334 60.50.001.7334
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7334 60.50.001.7334
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7334 60.50.001.7334
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7334 60.50.001.7334
60.50.001.7338
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7338 60.50.001.7338
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7338 60.50.001.7338
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7338 60.50.001.7338
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7338 60.50.001.7338
60.50.001.9113
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.9113 60.50.001.911
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.9113 60.50.001.911
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.9113 60.50.001.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.9113 60.50.001.911
60.50.001.9114
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.9114 60.50.001.911
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.9114 60.50.001.911
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.9114 60.50.001.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.9114 60.50.001.911
60.60.005.0081
LUMINARIA SUMINISTRO LUMINARIA 60.60.005.0081 60.60.005.008
LUMINARIA MONTAJE LUMINARIA 60.60.005.0081 60.60.005.008
LUMINARIA PROTOCOLO LUMINARIA 60.60.005.0081 60.60.005.008
60.60.005.0092
LUMINARIA SUMINISTRO LUMINARIA 60.60.005.0092 60.60.005.009
LUMINARIA MONTAJE LUMINARIA 60.60.005.0092 60.60.005.009
LUMINARIA PROTOCOLO LUMINARIA 60.60.005.0092 60.60.005.0092
60.70.001.0006
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.001.0006 60.70.001.0006
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.001.0006 60.70.001.0006
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.001.0006 60.70.001.0006
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.001.0006 60.70.001.0006
60.70.006.0006
MOTOR CONTROL CENTSUMINISTRO MOTOR CONTROL
60.70.006.0006 60.70.006.0006
MOTOR CONTROL CENTMONTAJE MOTOR CONTROL C60.70.006.0006 60.70.006.0006
MOTOR CONTROL CENTCONEXIONADO MOTOR CONTR60.70.006.0006 60.70.006.0006
MOTOR CONTROL CENTPROTOCOLOS MOTOR CONTRO60.70.006.0006 60.70.006.0006

70.20.008.0005
PLACA DE MONTAJE RECEPCION PLACAS DE MONTA
70.20.008.0005 70.20.008.0005
PLACA DE MONTAJE MONTAJE PLACAS DE MONTAJ70.20.008.0005 70.20.008.0005
PLACA DE MONTAJE CONEXIONADO PLACAS DE MO70.20.008.0005 70.20.008.0005
PLACA DE MONTAJE CONTRASTACION PLACAS DE 70.20.008.0005 70.20.008.0005
PLACA DE MONTAJE PROTOCOLOS PLACA DE MONT70.20.008.0005 70.20.008.0005
70.20.008.0009
CAMARA CCTV RECEPCION CAMARA CCTV 70.20.008.0009 70.20.008.000
CAMARA CCTV MONTAJE CAMARA CCTV 70.20.008.0009 70.20.008.0009
CAMARA CCTV CONEXIONADO CAMARA CCT70.20.008.0009 70.20.008.0009
CAMARA CCTV CONTRASTACION CAMARA CC70.20.008.0009 70.20.008.0009
CAMARA CCTV PROTOCOLOS CAMARA CCTV 70.20.008.0009 70.20.008.000
70.40.002.0002
CAJA DE CONEXION RECEPCION INSTRUMENTOS 70.40.002.0002 70.40.002.0002
CAJA DE CONEXION MONTAJE INSTRUMENTOS 70.40.002.0002 70.40.002.0002
CAJA DE CONEXION CONEXIONADO INSTRUMENTO70.40.002.0002 70.40.002.000
CAJA DE CONEXION CONTRASTACION INSTRUMEN70.40.002.0002 70.40.002.0002
70.40.002.0005
RACK REMOTO RECEPCION INSTRUMENTOS 70.40.002.0005 70.40.002.000
RACK REMOTO MONTAJE INSTRUMENTOS 70.40.002.0005 70.40.002.0005
RACK REMOTO CONEXIONADO INSTRUMENTO70.40.002.0005 70.40.002.000
RACK REMOTO CONTRASTACION INSTRUMEN70.40.002.0005 70.40.002.0005
RACK REMOTO PROTOCOLOS INSTRUMENTOS70.40.002.0005 70.40.002.000
70.50.001.0005
GABINETE DE COMUNI RECEPCION INSTRUMENTOS 70.50.001.0005 70.50.001.0005
GABINETE DE COMUNI MONTAJE INSTRUMENTOS 70.50.001.0005 70.50.001.0005
GABINETE DE COMUNI CONEXIONADO INSTRUMENTO70.50.001.0005 70.50.001.0005
GABINETE DE COMUNI CONTRASTACION INSTRUMEN70.50.001.0005 70.50.001.0005
GABINETE DE COMUNI PROTOCOLOS INSTRUMENTOS70.50.001.0005 70.50.001.0005
70.60.001.0002
CAMARA CCTV RECEPCION INSTRUMENTOS 70.60.001.0002 70.60.001.000
CAMARA CCTV MONTAJE INSTRUMENTOS 70.60.001.0002 70.60.001.0002
CAMARA CCTV CONEXIONADO INSTRUMENTO70.60.001.0002 70.60.001.0002
CAMARA CCTV CONTRASTACION INSTRUMEN70.60.001.0002 70.60.001.0002
CAMARA CCTV PROTOCOLOS INSTRUMENTOS70.60.001.0002 70.60.001.000
70.60.001.0003
GABINETE CCTV RECEPCION INSTRUMENTOS 70.60.001.0003 70.60.001.0003
GABINETE CCTV MONTAJE INSTRUMENTOS 70.60.001.0003 70.60.001.0003
GABINETE CCTV CONEXIONADO INSTRUMENTO70.60.001.0003 70.60.001.0003
GABINETE CCTV CONTRASTACION INSTRUMEN70.60.001.0003 70.60.001.0003
GABINETE CCTV PROTOCOLOS INSTRUMENTOS70.60.001.0003 70.60.001.0003

00.20.003.0001
EXCAVACION EXCAVACION DE ESCARPE 00.20.003.0001 00.20.003.000
00.20.004.0003
EXCAVACION REVESTIMIENTO CON MAMPO00.20.004.0003 00.20.004.000
00.25.001.0001
EXCAVACION EXCAVACION PARA PUESTA A T00.25.001.0001 00.25.001.000
00.25.002.0001
EXCAVACION EXCAVACION PARA PUESTA A T00.25.002.0001 00.25.002.000
00.25.004.0001
EXCAVACION EXCAVACION MASIVA TERREN 00.25.004.0001 00.25.004.000
00.25.007.0001
EXCAVACION EXCAVACION MASIVA RIPPER 00.25.007.0001 00.25.007.000
00.25.007.0002
EXCAVACION EXCAVACION MASIVA EN ROC 00.25.007.0002 00.25.007.000
00.30.002.0001
RELLENO RELLENO PARA PUESTA A TIER 00.30.002.0001 00.30.002.000
00.30.007.0001
RELLENO PERFILADO SUBRASANTE 00.30.007.0001 00.30.007.000
00.40.007.0002
BERMA PRETIL DE SEGURIDAD 00.40.007.0002 00.40.007.000

40.70.001.3009
COMPRESOR RECEPCION COMPRESOR 40.70.001.3009 40.70.001.300
COMPRESOR MONTAJE COMPRESOR 40.70.001.3009 40.70.001.3009
COMPRESOR MONTAJE COMPRESOR 40.70.001.3009 40.70.001.3009
COMPRESOR CONEXIONADO COMPRESOR 40.70.001.3009 40.70.001.3009
COMPRESOR PROTOCOLOS COMPRESOR 40.70.001.3009 40.70.001.300
40.70.001.3010
MOTOR ELECTRICO RECEPCION MOTOR ELECTRIC 40.70.001.3010 40.70.001.301
MOTOR ELECTRICO MONTAJE COMPRESORES 40.70.001.3010 40.70.001.3010
MOTOR ELECTRICO MONTAJE ACUMULADORES 40.70.001.3010 40.70.001.3010
MOTOR ELECTRICO CONEXIONADO MOTOR ELECT40.70.001.3010 40.70.001.3010
MOTOR ELECTRICO PROTOCOLOS MOTOR ELECTRI40.70.001.3010 40.70.001.301
40.30.001.5001
VENTILACION RECEPCION VENTILADOR 40.30.001.5001 40.30.001.500
VENTILACION MONTAJE VENTILADOR 40.30.001.5001 40.30.001.5001
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5001 40.30.001.5001
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5001 40.30.001.5001
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5001 40.30.001.500
40.30.001.5005
VENTILACION RECEPCION VENTILADOR 40.30.001.5005 40.30.001.500
VENTILACION MONTAJE VENTILADOR 40.30.001.5005 40.30.001.5005
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5005 40.30.001.5005
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5005 40.30.001.5005
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5005 40.30.001.500
40.30.001.5006
VENTILACION RECEPCION VENTILADOR 40.30.001.5006 40.30.001.500
VENTILACION MONTAJE VENTILADOR 40.30.001.5006 40.30.001.5006
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5006 40.30.001.5006
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5006 40.30.001.5006
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5006 40.30.001.500
40.30.001.5007
VENTILACION RECEPCION VENTILADOR 40.30.001.5007 40.30.001.500
VENTILACION MONTAJE VENTILADOR 40.30.001.5007 40.30.001.5007
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5007 40.30.001.5007
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5007 40.30.001.5007
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5007 40.30.001.500
40.30.001.5008
VENTILACION RECEPCION VENTILADOR 40.30.001.5008 40.30.001.500
VENTILACION MONTAJE VENTILADOR 40.30.001.5008 40.30.001.5008
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5008 40.30.001.5008
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5008 40.30.001.5008
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5008 40.30.001.500
40.30.001.5009
VENTILACION RECEPCION VENTILADOR 40.30.001.5009 40.30.001.500
VENTILACION MONTAJE VENTILADOR 40.30.001.5009 40.30.001.5009
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5009 40.30.001.5009
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5009 40.30.001.5009
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5009 40.30.001.500
40.30.001.5010
VENTILACION RECEPCION VENTILADOR 40.30.001.5010 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5010 40.30.001.5010
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5010 40.30.001.5010
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5010 40.30.001.5010
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5010 40.30.001.501
40.30.001.5011
VENTILACION RECEPCION VENTILADOR 40.30.001.5011 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5011 40.30.001.5011
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5011 40.30.001.5011
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5011 40.30.001.5011
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5011 40.30.001.501
40.30.001.5012
VENTILACION RECEPCION VENTILADOR 40.30.001.5012 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5012 40.30.001.5012
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5012 40.30.001.5012
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5012 40.30.001.5012
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5012 40.30.001.501
40.30.001.5013
VENTILACION RECEPCION VENTILADOR 40.30.001.5013 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5013 40.30.001.5013
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5013 40.30.001.5013
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5013 40.30.001.5013
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5013 40.30.001.501
40.30.001.5014
VENTILACION RECEPCION VENTILADOR 40.30.001.5014 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5014 40.30.001.5014
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5014 40.30.001.5014
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5014 40.30.001.5014
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5014 40.30.001.501
40.30.001.5015
VENTILACION RECEPCION VENTILADOR 40.30.001.5015 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5015 40.30.001.5015
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5015 40.30.001.5015
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5015 40.30.001.5015
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5015 40.30.001.501
40.30.001.5022
VENTILACION RECEPCION VENTILADOR 40.30.001.5022 40.30.001.502
VENTILACION MONTAJE VENTILADOR 40.30.001.5022 40.30.001.5022
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5022 40.30.001.5022
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5022 40.30.001.5022
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5022 40.30.001.502
40.30.001.5023
VENTILACION RECEPCION VENTILADOR 40.30.001.5023 40.30.001.502
VENTILACION MONTAJE VENTILADOR 40.30.001.5023 40.30.001.5023
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5023 40.30.001.5023
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5023 40.30.001.5023
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5023 40.30.001.502
40.30.001.5024
VENTILACION RECEPCION VENTILADOR 40.30.001.5024 40.30.001.502
VENTILACION MONTAJE VENTILADOR 40.30.001.5024 40.30.001.5024
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5024 40.30.001.5024
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5024 40.30.001.5024
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5024 40.30.001.502
40.30.001.5025
VENTILACION RECEPCION VENTILADOR 40.30.001.5025 40.30.001.502
VENTILACION MONTAJE VENTILADOR 40.30.001.5025 40.30.001.5025
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5025 40.30.001.5025
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5025 40.30.001.5025
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5025 40.30.001.502
40.30.001.5026
VENTILACION RECEPCION VENTILADOR 40.30.001.5026 40.30.001.502
VENTILACION MONTAJE VENTILADOR 40.30.001.5026 40.30.001.5026
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5026 40.30.001.5026
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5026 40.30.001.5026
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5026 40.30.001.502
40.30.001.5027
VENTILACION RECEPCION VENTILADOR 40.30.001.5027 40.30.001.502
VENTILACION MONTAJE VENTILADOR 40.30.001.5027 40.30.001.5027
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5027 40.30.001.5027
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5027 40.30.001.5027
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5027 40.30.001.502
40.30.001.5028
VENTILACION RECEPCION VENTILADOR 40.30.001.5028 40.30.001.502
VENTILACION MONTAJE VENTILADOR 40.30.001.5028 40.30.001.5028
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5028 40.30.001.5028
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5028 40.30.001.5028
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5028 40.30.001.502
40.30.001.5029
VENTILACION RECEPCION VENTILADOR 40.30.001.5029 40.30.001.502
VENTILACION MONTAJE VENTILADOR 40.30.001.5029 40.30.001.5029
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5029 40.30.001.5029
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5029 40.30.001.5029
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5029 40.30.001.502
40.30.001.5030
VENTILACION RECEPCION VENTILADOR 40.30.001.5030 40.30.001.503
VENTILACION MONTAJE VENTILADOR 40.30.001.5030 40.30.001.5030
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5030 40.30.001.5030
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5030 40.30.001.5030
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5030 40.30.001.503
40.30.001.5031
VENTILACION RECEPCION VENTILADOR 40.30.001.5031 40.30.001.503
VENTILACION MONTAJE VENTILADOR 40.30.001.5031 40.30.001.5031
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5031 40.30.001.5031
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5031 40.30.001.5031
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5031 40.30.001.503
40.30.001.5032
VENTILACION RECEPCION VENTILADOR 40.30.001.5032 40.30.001.503
VENTILACION MONTAJE VENTILADOR 40.30.001.5032 40.30.001.5032
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5032 40.30.001.5032
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5032 40.30.001.5032
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5032 40.30.001.503
40.30.001.5033
VENTILACION RECEPCION VENTILADOR 40.30.001.5033 40.30.001.503
VENTILACION MONTAJE VENTILADOR 40.30.001.5033 40.30.001.5033
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5033 40.30.001.5033
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5033 40.30.001.5033
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5033 40.30.001.503

51.40.001.0009
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0009 51.40.001.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0009 51.40.001.000
51.40.001.0018
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0018 51.40.001.0018
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0018 51.40.001.0018
51.40.001.0025
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0025 51.40.001.0025
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0025 51.40.001.0025
51.40.007.0023
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0023 51.40.007.002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0023 51.40.007.002
51.60.101.0001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0001 51.60.101.0001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0001 51.60.101.0001
51.60.101.0002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0002 51.60.101.0002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0002 51.60.101.0002
51.60.101.0004
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0004 51.60.101.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0004 51.60.101.000
51.60.101.0005
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0005 51.60.101.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0005 51.60.101.000
51.60.101.0006
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0006 51.60.101.0006
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0006 51.60.101.0006
51.60.101.0007
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0007 51.60.101.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0007 51.60.101.000
51.60.101.0013
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0013 51.60.101.0013
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0013 51.60.101.0013
51.60.101.0017
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0017 51.60.101.0017
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0017 51.60.101.0017
51.60.101.0019
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0019 51.60.101.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0019 51.60.101.001
51.60.101.0020
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0020 51.60.101.002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0020 51.60.101.002
51.60.101.0021
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0021 51.60.101.0021
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0021 51.60.101.0021
52.20.001.0024
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.001.0024 52.20.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0024 52.20.001.002
52.20.003.0055
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0055 52.20.003.005
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0055 52.20.003.005
52.20.003.0059
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0059 52.20.003.005
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0059 52.20.003.005
52.20.003.0068
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0068 52.20.003.0068
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0068 52.20.003.0068
52.20.003.0071
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0071 52.20.003.0071
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0071 52.20.003.0071
52.20.003.0076
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0076 52.20.003.007
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0076 52.20.003.007
52.20.003.0082
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0082 52.20.003.0082
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0082 52.20.003.0082
52.40.006.0023
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0023 52.40.006.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0023 52.40.006.002

60.20.002.0002
CONDUIT SUMINISTRO CONDUIT 60.20.002.0002 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0002 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0002 60.20.002.000
60.20.002.0005
CONDUIT SUMINISTRO CONDUIT 60.20.002.0005 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0005 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0005 60.20.002.000
60.20.002.0032
CONDUIT SUMINISTRO CONDUIT 60.20.002.0032 60.20.002.003
CONDUIT MONTAJE CONDUIT 60.20.002.0032 60.20.002.003
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0032 60.20.002.003
60.30.002.6312
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6312 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6312 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6312 60.30.002.631
60.30.002.6314
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6314 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6314 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6314 60.30.002.631
60.30.002.6315
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6315 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6315 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6315 60.30.002.631
60.30.002.7021
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7021 60.30.002.702
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7021 60.30.002.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7021 60.30.002.702
60.30.002.7022
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7022 60.30.002.702
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7022 60.30.002.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7022 60.30.002.702
60.30.002.7221
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7221 60.30.002.722
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7221 60.30.002.722
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7221 60.30.002.722
60.30.002.7331
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7331 60.30.002.733
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7331 60.30.002.733
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7331 60.30.002.733
60.30.002.8101
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8101 60.30.002.810
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8101 60.30.002.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8101 60.30.002.810
60.30.002.8102
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8102 60.30.002.810
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8102 60.30.002.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8102 60.30.002.810
60.30.002.9113
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.9113 60.30.002.911
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.9113 60.30.002.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.9113 60.30.002.911
60.30.002.9114
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.9114 60.30.002.911
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.9114 60.30.002.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.9114 60.30.002.911
60.30.003.0001
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.003.0001 60.30.003.000
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.003.0001 60.30.003.000
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.003.0001 60.30.003.000
60.40.001.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0001 60.40.001.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0001 60.40.001.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0001 60.40.001.000
60.40.001.0002
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0002 60.40.001.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0002 60.40.001.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0002 60.40.001.000
60.40.002.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0001 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0001 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0001 60.40.002.000
60.40.002.0002
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0002 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0002 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0002 60.40.002.000
60.40.002.0003
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0003 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0003 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0003 60.40.002.000
60.40.005.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.005.0001 60.40.005.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.005.0001 60.40.005.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.005.0001 60.40.005.000
60.50.001.1405
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.1405 60.50.001.1405
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.1405 60.50.001.140
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.1405 60.50.001.1405
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.1405 60.50.001.1405
60.50.001.6306
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6306 60.50.001.630
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6306 60.50.001.630
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6306 60.50.001.6306
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6306 60.50.001.6306
60.50.001.6315
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6315 60.50.001.6315
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6315 60.50.001.6315
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6315 60.50.001.631
60.50.001.7021
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7021 60.50.001.702
60.50.001.7334
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7334 60.50.001.7334
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7334 60.50.001.7334
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7334 60.50.001.7334
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7334 60.50.001.7334
60.50.001.7338
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7338 60.50.001.7338
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7338 60.50.001.7338
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7338 60.50.001.7338
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7338 60.50.001.7338
60.50.001.9113
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.9113 60.50.001.911
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.9113 60.50.001.911
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.9113 60.50.001.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.9113 60.50.001.911
60.50.001.9114
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.9114 60.50.001.911
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.9114 60.50.001.911
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.9114 60.50.001.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.9114 60.50.001.911
60.60.005.0081
LUMINARIA SUMINISTRO LUMINARIA 60.60.005.0081 60.60.005.008
LUMINARIA MONTAJE LUMINARIA 60.60.005.0081 60.60.005.008
LUMINARIA PROTOCOLO LUMINARIA 60.60.005.0081 60.60.005.008
60.60.005.0092
LUMINARIA SUMINISTRO LUMINARIA 60.60.005.0092 60.60.005.009
LUMINARIA MONTAJE LUMINARIA 60.60.005.0092 60.60.005.009
LUMINARIA PROTOCOLO LUMINARIA 60.60.005.0092 60.60.005.0092
60.70.001.0006
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.001.0006 60.70.001.0006
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.001.0006 60.70.001.0006
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.001.0006 60.70.001.0006
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.001.0006 60.70.001.0006
60.70.006.0006
MOTOR CONTROL CENTSUMINISTRO MOTOR CONTROL
60.70.006.0006 60.70.006.0006
MOTOR CONTROL CENTMONTAJE MOTOR CONTROL C60.70.006.0006 60.70.006.0006
MOTOR CONTROL CENTCONEXIONADO MOTOR CONTR60.70.006.0006 60.70.006.0006
MOTOR CONTROL CENTPROTOCOLOS MOTOR CONTRO60.70.006.0006 60.70.006.0006

70.20.008.0005
PLACA DE MONTAJE RECEPCION PLACAS DE MONTA
70.20.008.0005 70.20.008.0005
PLACA DE MONTAJE MONTAJE PLACAS DE MONTAJ70.20.008.0005 70.20.008.0005
PLACA DE MONTAJE CONEXIONADO PLACAS DE MO70.20.008.0005 70.20.008.0005
PLACA DE MONTAJE CONTRASTACION PLACAS DE 70.20.008.0005 70.20.008.0005
PLACA DE MONTAJE PROTOCOLOS PLACA DE MONT70.20.008.0005 70.20.008.0005
70.20.008.0009
CAMARA CCTV RECEPCION CAMARA CCTV 70.20.008.0009 70.20.008.000
CAMARA CCTV MONTAJE CAMARA CCTV 70.20.008.0009 70.20.008.0009
CAMARA CCTV CONEXIONADO CAMARA CCT70.20.008.0009 70.20.008.0009
CAMARA CCTV CONTRASTACION CAMARA CC70.20.008.0009 70.20.008.0009
CAMARA CCTV PROTOCOLOS CAMARA CCTV 70.20.008.0009 70.20.008.000
70.40.002.0002
CAJA DE CONEXION RECEPCION INSTRUMENTOS 70.40.002.0002 70.40.002.0002
CAJA DE CONEXION MONTAJE INSTRUMENTOS 70.40.002.0002 70.40.002.0002
CAJA DE CONEXION CONEXIONADO INSTRUMENTO70.40.002.0002 70.40.002.000
CAJA DE CONEXION CONTRASTACION INSTRUMEN70.40.002.0002 70.40.002.0002
70.40.002.0005
RACK REMOTO RECEPCION INSTRUMENTOS 70.40.002.0005 70.40.002.000
RACK REMOTO MONTAJE INSTRUMENTOS 70.40.002.0005 70.40.002.0005
RACK REMOTO CONEXIONADO INSTRUMENTO70.40.002.0005 70.40.002.000
RACK REMOTO CONTRASTACION INSTRUMEN70.40.002.0005 70.40.002.0005
RACK REMOTO PROTOCOLOS INSTRUMENTOS70.40.002.0005 70.40.002.000
70.50.001.0005
GABINETE DE COMUNI RECEPCION INSTRUMENTOS 70.50.001.0005 70.50.001.0005
GABINETE DE COMUNI MONTAJE INSTRUMENTOS 70.50.001.0005 70.50.001.0005
GABINETE DE COMUNI CONEXIONADO INSTRUMENTO70.50.001.0005 70.50.001.0005
GABINETE DE COMUNI CONTRASTACION INSTRUMEN70.50.001.0005 70.50.001.0005
GABINETE DE COMUNI PROTOCOLOS INSTRUMENTOS70.50.001.0005 70.50.001.0005
70.60.001.0002
CAMARA CCTV RECEPCION INSTRUMENTOS 70.60.001.0002 70.60.001.000
CAMARA CCTV MONTAJE INSTRUMENTOS 70.60.001.0002 70.60.001.0002
CAMARA CCTV CONEXIONADO INSTRUMENTO70.60.001.0002 70.60.001.0002
CAMARA CCTV CONTRASTACION INSTRUMEN70.60.001.0002 70.60.001.0002
CAMARA CCTV PROTOCOLOS INSTRUMENTOS70.60.001.0002 70.60.001.000
70.60.001.0003
GABINETE CCTV RECEPCION INSTRUMENTOS 70.60.001.0003 70.60.001.0003
GABINETE CCTV MONTAJE INSTRUMENTOS 70.60.001.0003 70.60.001.0003
GABINETE CCTV CONEXIONADO INSTRUMENTO70.60.001.0003 70.60.001.0003
GABINETE CCTV CONTRASTACION INSTRUMEN70.60.001.0003 70.60.001.0003
GABINETE CCTV PROTOCOLOS INSTRUMENTOS70.60.001.0003 70.60.001.0003

00.20.003.0001
EXCAVACION EXCAVACION DE ESCARPE 00.20.003.0001 00.20.003.000
00.20.004.0003
EXCAVACION REVESTIMIENTO CON MAMPO00.20.004.0003 00.20.004.000
00.25.001.0001
EXCAVACION EXCAVACION PARA PUESTA A T00.25.001.0001 00.25.001.000
00.25.002.0001
EXCAVACION EXCAVACION PARA PUESTA A T00.25.002.0001 00.25.002.000
00.25.004.0001
EXCAVACION EXCAVACION MASIVA TERREN 00.25.004.0001 00.25.004.000
00.25.007.0001
EXCAVACION EXCAVACION MASIVA RIPPER 00.25.007.0001 00.25.007.000
00.25.007.0002
EXCAVACION EXCAVACION MASIVA EN ROC 00.25.007.0002 00.25.007.000
00.30.002.0001
RELLENO RELLENO PARA PUESTA A TIER 00.30.002.0001 00.30.002.000
00.30.007.0001
RELLENO PERFILADO SUBRASANTE 00.30.007.0001 00.30.007.000
00.40.007.0002
BERMA PRETIL DE SEGURIDAD 00.40.007.0002 00.40.007.000

10.20.001.0001
PERNO SUMINISTRO Y COLOCACION 10.20.001.0001 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0001 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0001 10.20.001.000
10.20.001.0002
PERNO SUMINISTRO Y COLOCACION 10.20.001.0002 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0002 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0002 10.20.001.000
10.20.001.0101
PERNO SUMINISTRO Y COLOCACION 10.20.001.0101 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0101 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0101 10.20.001.010
10.20.001.0102
PERNO SUMINISTRO Y COLOCACION 10.20.001.0102 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0102 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0102 10.20.001.010
10.20.001.0003
PERNO SUMINISTRO Y COLOCACION 10.20.001.0003 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0003 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0003 10.20.001.000
10.20.001.0004
PERNO SUMINISTRO Y COLOCACION 10.20.001.0004 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0004 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0004 10.20.001.000
10.20.001.0103
PERNO SUMINISTRO Y COLOCACION 10.20.001.0103 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0103 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0103 10.20.001.010
10.20.001.0104
PERNO SUMINISTRO Y COLOCACION 10.20.001.0104 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0104 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0104 10.20.001.010
10.20.001.0008
PERNO SUMINISTRO Y COLOCACION 10.20.001.0008 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0008 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0008 10.20.001.000
10.20.001.0108
PERNO SUMINISTRO Y COLOCACION 10.20.001.0108 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0108 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0108 10.20.001.010
10.20.001.0012
PERNO SUMINISTRO Y COLOCACION 10.20.001.0012 10.20.001.001
PERNO LIMPIEZA PERNO 10.20.001.0012 10.20.001.001
PERNO PROTOCOLO PERNO 10.20.001.0012 10.20.001.001
10.20.001.0112
PERNO SUMINISTRO Y COLOCACION 10.20.001.0112 10.20.001.011
PERNO LIMPIEZA PERNO 10.20.001.0112 10.20.001.011
PERNO PROTOCOLO PERNO 10.20.001.0112 10.20.001.011
10.20.002.0001
PERNO SUMINISTRO Y COLOCACION 10.20.002.0001 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0001 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0001 10.20.002.000
10.20.002.0002
PERNO SUMINISTRO Y COLOCACION 10.20.002.0002 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0002 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0002 10.20.002.000
10.40.001.0005
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0005 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0005 10.40.001.000
10.40.001.0006
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0006 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0006 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0006 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0006 10.40.001.000
10.40.001.0009
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0009 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0009 10.40.001.000
10.40.001.0010
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0010 10.40.001.001
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0010 10.40.001.001
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0010 10.40.001.001
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0010 10.40.001.001
10.40.001.0011
ACERO REFUERZO DUR SUMINISTRO DE ACERO REFU 10.40.001.0011 10.40.001.001
ACERO REFUERZO DUR CORTADO ACERO REFUERZO 10.40.001.0011 10.40.001.001
ACERO REFUERZO DUR DOBLADO ACERO REFUERZO 10.40.001.0011 10.40.001.001
ACERO REFUERZO DUR PUNCH LIST ACERO REFUERZO10.40.001.0011 10.40.001.001
10.40.001.0027
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0027 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0027 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0027 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0027 10.40.001.002
10.40.002.2805
CONCRETO COLOCACION ACERO 10.40.002.2805 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2805 10.40.002.280
10.40.002.2806
CONCRETO COLOCACION ACERO 10.40.002.2806 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2806 10.40.002.280
10.40.002.2809
CONCRETO COLOCACION ACERO 10.40.002.2809 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2809 10.40.002.280
10.40.002.2810
CONCRETO COLOCACION ACERO 10.40.002.2810 10.40.002.281
CONCRETO ENCOFRADO CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO VACIADO CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO DESCIMBRE CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO LIMPIEZA CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO PUNCH LIST CONCRETO 10.40.002.2810 10.40.002.281
10.40.002.2811
CONCRETO DURMIENTECOLOCACION ACERO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEENCOFRADO CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTETOPOGRAFIA CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEVACIADO CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEDESCIMBRE CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTELIMPIEZA CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEPUNCH LIST CONCRETO 10.40.002.2811 10.40.002.281
10.40.002.3527
CONCRETO COLOCACION ACERO 10.40.002.3527 10.40.002.352
CONCRETO ENCOFRADO CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO VACIADO CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO DESCIMBRE CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO LIMPIEZA CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO PUNCH LIST CONCRETO 10.40.002.3527 10.40.002.352
10.60.002.1061
SOLADO ENCOFRADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO VACIADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO DESCIMBRE CONCRETO 10.60.002.1061 10.60.002.106
SOLADO LIMPIEZA CONCRETO 10.60.002.1061 10.60.002.106
SOLADO PUNCH LIST CONCRETO 10.60.002.1061 10.60.002.106

20.10.001.0003
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0003 20.10.001.000
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0003 20.10.001.000
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0003 20.10.001.000
20.10.001.0103
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0103 20.10.001.010
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0103 20.10.001.010
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0103 20.10.001.010
20.10.001.0203
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0203 20.10.001.020
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0203 20.10.001.020
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0203 20.10.001.020
20.10.001.0303
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0303 20.10.001.030
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0303 20.10.001.030
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0303 20.10.001.030
20.10.001.0403
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0403 20.10.001.040
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0403 20.10.001.040
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0403 20.10.001.040
20.10.001.0503
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0503 20.10.001.050
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0503 20.10.001.050
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0503 20.10.001.050
20.10.005.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.005.0003 20.10.005.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.005.0003 20.10.005.000
20.10.006.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.006.0003 20.10.006.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.006.0003 20.10.006.000
20.10.009.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0003 20.10.009.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0003 20.10.009.000
20.10.009.0103
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0103 20.10.009.010
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0103 20.10.009.010
20.10.009.0203
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0203 20.10.009.020
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0203 20.10.009.020

30.10.001.2001
REVESTIMIENTO ARMADO Y MONTAJE REVEST 30.10.001.2001 30.10.001.20010
REVESTIMIENTO FIJACIONES REVESTIMIENTO 30.10.001.2001 30.10.001.20010
REVESTIMIENTO PROTOCOLOS REVESTIMIENTO30.10.001.2001 30.10.001.20010
30.10.002.2001
REVESTIMIENTO ARMADO Y MONTAJE REVEST 30.10.002.2001 30.10.002.20010
REVESTIMIENTO FIJACIONES REVESTIMIENTO 30.10.002.2001 30.10.002.20010
REVESTIMIENTO PROTOCOLOS REVESTIMIENTO30.10.002.2001 30.10.002.20010

40.70.001.2631
MOTOR ELECTRICO RECEPCION MOTOR ELECTRIC 40.70.001.2631 40.70.001.263
MOTOR ELECTRICO MONTAJE BOMBA 40.70.001.2631 40.70.001.263
MOTOR ELECTRICO CONEXIONADO MOTOR ELECT40.70.001.2631 40.70.001.263
MOTOR ELECTRICO PROTOCOLOS MOTOR ELECTRI40.70.001.2631 40.70.001.263
40.30.001.5016
VENTILACION RECEPCION VENTILADOR 40.30.001.5016 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5016 40.30.001.501
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5016 40.30.001.501
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5016 40.30.001.501
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5016 40.30.001.501
40.30.001.5017
VENTILACION RECEPCION VENTILADOR 40.30.001.5017 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5017 40.30.001.501
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5017 40.30.001.501
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5017 40.30.001.501
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5017 40.30.001.501
40.30.001.5018
VENTILACION RECEPCION VENTILADOR 40.30.001.5018 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5018 40.30.001.501
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5018 40.30.001.501
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5018 40.30.001.501
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5018 40.30.001.501
40.60.001.1707
BOMBA SUMINISTRO BOMBA 40.60.001.1707 40.60.001.170
BOMBA MONTAJE BOMBA 40.60.001.1707 40.60.001.170
BOMBA CONEXIONADO BOMBA 40.60.001.1707 40.60.001.170
BOMBA PROTOCOLO BOMBA 40.60.001.1707 40.60.001.170
40.60.001.1708
MOTOR ELECTRICO RECEPCION MOTOR ELECTRIC 40.60.001.1708 40.60.001.170
MOTOR ELECTRICO MONTAJE BOMBA 40.60.001.1708 40.60.001.170
MOTOR ELECTRICO CONEXIONADO MOTOR ELECT40.60.001.1708 40.60.001.170
MOTOR ELECTRICO PROTOCOLOS MOTOR ELECTRI40.60.001.1708 40.60.001.170
40.70.001.3801
SUPRESOR DE POLVO RECEPCION SUPRESOR POLVO40.70.001.3801 40.70.001.380
SUPRESOR DE POLVO MONTAJE SUPRESOR POLVO 40.70.001.3801 40.70.001.380
SUPRESOR DE POLVO CONEXIONADO SUPRESOR PO40.70.001.3801 40.70.001.380
SUPRESOR DE POLVO PROTOCOLO SUPRESOR POLV 40.70.001.3801 40.70.001.380
40.70.001.3802
SUPRESOR DE POLVO RECEPCION SUPRESOR POLVO40.70.001.3802 40.70.001.380
SUPRESOR DE POLVO MONTAJE SUPRESOR POLVO 40.70.001.3802 40.70.001.380
SUPRESOR DE POLVO CONEXIONADO SUPRESOR PO40.70.001.3802 40.70.001.380
SUPRESOR DE POLVO PROTOCOLO SUPRESOR POLV 40.70.001.3802 40.70.001.380
40.70.001.3803
SUPRESOR DE POLVO RECEPCION SUPRESOR POLVO40.70.001.3803 40.70.001.380
SUPRESOR DE POLVO MONTAJE SUPRESOR POLVO 40.70.001.3803 40.70.001.380
SUPRESOR DE POLVO CONEXIONADO SUPRESOR PO40.70.001.3803 40.70.001.380
SUPRESOR DE POLVO PROTOCOLO SUPRESOR POLV 40.70.001.3803 40.70.001.380
40.70.001.3804
SUPRESOR DE POLVO RECEPCION SUPRESOR POLVO40.70.001.3804 40.70.001.380
SUPRESOR DE POLVO MONTAJE SUPRESOR POLVO 40.70.001.3804 40.70.001.380
SUPRESOR DE POLVO CONEXIONADO SUPRESOR PO40.70.001.3804 40.70.001.380
SUPRESOR DE POLVO PROTOCOLO SUPRESOR POLV 40.70.001.3804 40.70.001.380
40.80.001.218
FAJA TRANSPORTADORRECEPCION 40.80.001.218 40.80.001.218
FAJA TRANSPORTADORMONTAJE ELEMENTOS ESTRUC40.80.001.218 40.80.001.218
FAJA TRANSPORTADORMONTAJE ELEMENTOS MECAN40.80.001.218 40.80.001.218
FAJA TRANSPORTADORMONTAJE CHUTES 40.80.001.218 40.80.001.218
FAJA TRANSPORTADORCONEXIONADO Y PRUEBAS 40.80.001.218 40.80.001.218
FAJA TRANSPORTADORPROTOCOLOS ENTREGA 40.80.001.218 40.80.001.218
40.80.001.252
MESAS DE IMPACTO RECEPCION 40.80.001.252 40.80.001.252
MESAS DE IMPACTO MONTAJE ELEMENTOS ESTRUC40.80.001.252 40.80.001.252
MESAS DE IMPACTO MONTAJE ELEMENTOS MECAN40.80.001.252 40.80.001.252
MESAS DE IMPACTO MONTAJE CHUTES 40.80.001.252 40.80.001.252
MESAS DE IMPACTO CONEXIONADO Y PRUEBAS 40.80.001.252 40.80.001.252
MESAS DE IMPACTO PROTOCOLOS ENTREGA 40.80.001.252 40.80.001.252
40.80.001.253
MESAS CARGA RECEPCION 40.80.001.253 40.80.001.253
MESAS CARGA MONTAJE ELEMENTOS ESTRUC40.80.001.253 40.80.001.253
MESAS CARGA MONTAJE ELEMENTOS MECAN40.80.001.253 40.80.001.253
MESAS CARGA MONTAJE CHUTES 40.80.001.253 40.80.001.253
MESAS CARGA CONEXIONADO Y PRUEBAS 40.80.001.253 40.80.001.253
MESAS CARGA PROTOCOLOS ENTREGA 40.80.001.253 40.80.001.253
40.80.001.255
POLEA DE COLA RECEPCION 40.80.001.255 40.80.001.255
POLEA DE COLA MONTAJE ELEMENTOS ESTRUC40.80.001.255 40.80.001.255
POLEA DE COLA MONTAJE ELEMENTOS MECAN40.80.001.255 40.80.001.255
POLEA DE COLA MONTAJE CHUTES 40.80.001.255 40.80.001.255
POLEA DE COLA CONEXIONADO Y PRUEBAS 40.80.001.255 40.80.001.255
POLEA DE COLA PROTOCOLOS ENTREGA 40.80.001.255 40.80.001.255
40.80.001.258
MOTOR ELECTRICO GEARECEPCION 40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEAMONTAJE ELEMENTOS ESTRUC40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEAMONTAJE ELEMENTOS MECAN40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEAMONTAJE CHUTES 40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEACONEXIONADO Y PRUEBAS 40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEAPROTOCOLOS ENTREGA 40.80.001.258 40.80.001.258
40.80.001.259
MOTOR ELECTRICO GEARECEPCION 40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEAMONTAJE ELEMENTOS ESTRUC40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEAMONTAJE ELEMENTOS MECAN40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEAMONTAJE CHUTES 40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEACONEXIONADO Y PRUEBAS 40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEAPROTOCOLOS ENTREGA 40.80.001.259 40.80.001.259
40.80.001.260
BALANZA FAJA RECEPCION 40.80.001.260 40.80.001.260
BALANZA FAJA MONTAJE ELEMENTOS ESTRUC40.80.001.260 40.80.001.260
BALANZA FAJA MONTAJE ELEMENTOS MECAN40.80.001.260 40.80.001.260
BALANZA FAJA MONTAJE CHUTES 40.80.001.260 40.80.001.260
BALANZA FAJA CONEXIONADO Y PRUEBAS 40.80.001.260 40.80.001.260
BALANZA FAJA PROTOCOLOS ENTREGA 40.80.001.260 40.80.001.260
40.80.001.263
FRENO POLEA MOTRIZ RECEPCION 40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ MONTAJE ELEMENTOS ESTRUC40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ MONTAJE ELEMENTOS MECAN40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ MONTAJE CHUTES 40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ CONEXIONADO Y PRUEBAS 40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ PROTOCOLOS ENTREGA 40.80.001.263 40.80.001.263
40.80.001.264
MOTOR BOMBA POLEARECEPCION 40.80.001.264 40.80.001.264
MOTOR BOMBA POLEAMONTAJE ELEMENTOS ESTRUC40.80.001.264 40.80.001.264
MOTOR BOMBA POLEAMONTAJE ELEMENTOS MECAN40.80.001.264 40.80.001.264
MOTOR BOMBA POLEAMONTAJE CHUTES 40.80.001.264 40.80.001.264
MOTOR BOMBA POLEACONEXIONADO Y PRUEBAS 40.80.001.264 40.80.001.264
MOTOR BOMBA POLEAPROTOCOLOS ENTREGA 40.80.001.264 40.80.001.264
40.80.001.265
FRENO POLEA MOTRIZ RECEPCION 40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ MONTAJE ELEMENTOS ESTRUC40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ MONTAJE ELEMENTOS MECAN40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ MONTAJE CHUTES 40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ CONEXIONADO Y PRUEBAS 40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ PROTOCOLOS ENTREGA 40.80.001.265 40.80.001.265
40.80.001.266
MOTOR BOMBA POLEARECEPCION 40.80.001.266 40.80.001.266
MOTOR BOMBA POLEAMONTAJE ELEMENTOS ESTRUC40.80.001.266 40.80.001.266
MOTOR BOMBA POLEAMONTAJE ELEMENTOS MECAN40.80.001.266 40.80.001.266
MOTOR BOMBA POLEAMONTAJE CHUTES 40.80.001.266 40.80.001.266
MOTOR BOMBA POLEACONEXIONADO Y PRUEBAS 40.80.001.266 40.80.001.266
MOTOR BOMBA POLEAPROTOCOLOS ENTREGA 40.80.001.266 40.80.001.266
40.80.001.267
FRENO CABESTRANTE RECEPCION 40.80.001.267 40.80.001.267
FRENO CABESTRANTE MONTAJE ELEMENTOS ESTRUC40.80.001.267 40.80.001.267
FRENO CABESTRANTE MONTAJE ELEMENTOS MECAN40.80.001.267 40.80.001.267
FRENO CABESTRANTE MONTAJE CHUTES 40.80.001.267 40.80.001.267
FRENO CABESTRANTE CONEXIONADO Y PRUEBAS 40.80.001.267 40.80.001.267
FRENO CABESTRANTE PROTOCOLOS ENTREGA 40.80.001.267 40.80.001.267
40.80.001.270
BOMBA 1 ENFRIAMIEN RECEPCION 40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN MONTAJE ELEMENTOS ESTRUC40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN MONTAJE ELEMENTOS MECAN40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN MONTAJE CHUTES 40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN CONEXIONADO Y PRUEBAS 40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN PROTOCOLOS ENTREGA 40.80.001.270 40.80.001.270
40.80.001.271
BOMBA 2 ENFRIAMIEN RECEPCION 40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN MONTAJE ELEMENTOS ESTRUC40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN MONTAJE ELEMENTOS MECAN40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN MONTAJE CHUTES 40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN CONEXIONADO Y PRUEBAS 40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN PROTOCOLOS ENTREGA 40.80.001.271 40.80.001.271
40.80.001.272
UNIDAD DE ENFRIAMIERECEPCION 40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS ESTRUC40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS MECAN40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIEMONTAJE CHUTES 40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIECONEXIONADO Y PRUEBAS 40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIEPROTOCOLOS ENTREGA 40.80.001.272 40.80.001.272
40.80.001.273
UNIDAD DE ENFRIAMIERECEPCION 40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS ESTRUC40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS MECAN40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIEMONTAJE CHUTES 40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIECONEXIONADO Y PRUEBAS 40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIEPROTOCOLOS ENTREGA 40.80.001.273 40.80.001.273
40.80.001.274
UNIDAD DE ENFRIAMIERECEPCION 40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS ESTRUC40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS MECAN40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIEMONTAJE CHUTES 40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIECONEXIONADO Y PRUEBAS 40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIEPROTOCOLOS ENTREGA 40.80.001.274 40.80.001.274
40.80.001.275
PANEL DE CONTROL SI RECEPCION 40.80.001.275 40.80.001.275
PANEL DE CONTROL SI MONTAJE ELEMENTOS ESTRUC40.80.001.275 40.80.001.275
PANEL DE CONTROL SI MONTAJE ELEMENTOS MECAN40.80.001.275 40.80.001.275
PANEL DE CONTROL SI MONTAJE CHUTES 40.80.001.275 40.80.001.275
PANEL DE CONTROL SI CONEXIONADO Y PRUEBAS 40.80.001.275 40.80.001.275
PANEL DE CONTROL SI PROTOCOLOS ENTREGA 40.80.001.275 40.80.001.275
40.80.001.276
IDLER GUARDING RECEPCION 40.80.001.276 40.80.001.276
IDLER GUARDING MONTAJE ELEMENTOS ESTRUC40.80.001.276 40.80.001.276
IDLER GUARDING MONTAJE ELEMENTOS MECAN40.80.001.276 40.80.001.276
IDLER GUARDING MONTAJE CHUTES 40.80.001.276 40.80.001.276
IDLER GUARDING CONEXIONADO Y PRUEBAS 40.80.001.276 40.80.001.276
IDLER GUARDING PROTOCOLOS ENTREGA 40.80.001.276 40.80.001.276
40.80.001.3201
POLIPLASTO MANTENCIRECEPCION 40.80.001.3201 40.80.001.3201
POLIPLASTO MANTENCIMONTAJE ELEMENTOS ESTRUC40.80.001.3201 40.80.001.3201
POLIPLASTO MANTENCIMONTAJE ELEMENTOS MECAN40.80.001.3201 40.80.001.3201
POLIPLASTO MANTENCIMONTAJE CHUTES 40.80.001.3201 40.80.001.3201
40.80.001.3206
POLIPLASTO MANTENCIRECEPCION 40.80.001.3206 40.80.001.3206
POLIPLASTO MANTENCIMONTAJE ELEMENTOS ESTRUC40.80.001.3206 40.80.001.3206
POLIPLASTO MANTENCIMONTAJE ELEMENTOS MECAN40.80.001.3206 40.80.001.3206
POLIPLASTO MANTENCIMONTAJE CHUTES 40.80.001.3206 40.80.001.3206

51.20.001.0006
FABRICACION DE TUBERFABRICACION DE TUBERIAS R51.20.001.0006 51.20.001.000
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0006 51.20.001.000
51.20.001.0012
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0012 51.20.001.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0012 51.20.001.001
51.20.002.0045
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0045 51.20.002.0045
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0045 51.20.002.0045
51.30.001.0016
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0016 51.30.001.0016
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0016 51.30.001.0016
51.40.001.0003
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0003 51.40.001.0003
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0003 51.40.001.0003
51.40.001.0010
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0010 51.40.001.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0010 51.40.001.0010
51.40.001.0015
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0015 51.40.001.0015
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0015 51.40.001.0015
51.40.001.0024
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0024 51.40.001.0024
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0024 51.40.001.0024
51.40.001.0025
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0025 51.40.001.0025
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0025 51.40.001.0025
51.40.001.0026
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0026 51.40.001.0026
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0026 51.40.001.0026
51.40.007.0011
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0011 51.40.007.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0011 51.40.007.001
51.40.007.0014
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0014 51.40.007.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0014 51.40.007.001
51.40.007.0024
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0024 51.40.007.002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0024 51.40.007.002
51.60.101.0003
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0003 51.60.101.0003
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0003 51.60.101.0003
51.60.101.0004
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0004 51.60.101.0004
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0004 51.60.101.0004
51.60.101.0019
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0019 51.60.101.0019
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0019 51.60.101.0019
51.60.101.0021
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0021 51.60.101.0021
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0021 51.60.101.0021
52.20.001.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.001.0012 52.20.001.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0012 52.20.001.0012
52.20.001.0015
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.001.0015 52.20.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0015 52.20.001.001
52.20.001.0025
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.001.0025 52.20.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0025 52.20.001.002
52.20.003.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0002 52.20.003.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0002 52.20.003.0002
52.20.003.0019
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0019 52.20.003.0019
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0019 52.20.003.0019
52.20.003.0061
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0061 52.20.003.0061
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0061 52.20.003.0061
52.20.003.0064
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0064 52.20.003.0064
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0064 52.20.003.0064
52.20.003.0065
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0065 52.20.003.0065
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0065 52.20.003.0065
52.20.003.0068
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0068 52.20.003.0068
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0068 52.20.003.0068
52.20.003.0081
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.20.003.0081 52.20.003.0081
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0081 52.20.003.0081
52.40.006.0011
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0011 52.40.006.0011
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0011 52.40.006.0011
52.40.006.0014
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0014 52.40.006.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0014 52.40.006.001
52.40.006.0024
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0024 52.40.006.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0024 52.40.006.002

70.20.001.0003
PESOMETRO RECEPCION PESOMETRO 70.20.001.0003 70.20.001.000
PESOMETRO MONTAJE PESOMETRO 70.20.001.0003 70.20.001.000
PESOMETRO CONEXIONADO PESOMETRO 70.20.001.0003 70.20.001.000
PESOMETRO CONTRASTACION PESOMETRO70.20.001.0003 70.20.001.000
PESOMETRO PROTOCOLOS PESOMETRO 70.20.001.0003 70.20.001.000
70.20.001.0015
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0015 70.20.001.001
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0015 70.20.001.001
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0015 70.20.001.001
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0015 70.20.001.001
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0015 70.20.001.001
70.20.001.0016
INDICADOR RECEPCION INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR MONTAJE INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR CONEXIONADO INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR CONTRASTACION INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR PROTOCOLOS INDICADOR 70.20.001.0016 70.20.001.001
70.20.001.0020
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0020 70.20.001.002
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0020 70.20.001.002
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0020 70.20.001.002
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0020 70.20.001.002
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0020 70.20.001.002
70.20.001.0031
SENSOR RECEPCION SENSOR 70.20.001.0031 70.20.001.003
SENSOR MONTAJE SENSOR 70.20.001.0031 70.20.001.003
SENSOR CONEXIONADO SENSOR 70.20.001.0031 70.20.001.003
SENSOR CONTRASTACION SENSOR 70.20.001.0031 70.20.001.003
SENSOR PROTOCOLOS SENSOR 70.20.001.0031 70.20.001.003
70.20.001.0032
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0032 70.20.001.003
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0032 70.20.001.003
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0032 70.20.001.003
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0032 70.20.001.003
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0032 70.20.001.003
70.20.001.0038
SIRENA RECEPCION SIRENA 70.20.001.0038 70.20.001.003
SIRENA MONTAJE SIRENA 70.20.001.0038 70.20.001.003
SIRENA CONEXIONADO SIRENA 70.20.001.0038 70.20.001.003
SIRENA CONTRASTACION SIRENA 70.20.001.0038 70.20.001.003
SIRENA PROTOCOLOS SIRENA 70.20.001.0038 70.20.001.003
70.20.001.0039
BALIZA RECEPCION BALIZA 70.20.001.0039 70.20.001.003
BALIZA MONTAJE BALIZA 70.20.001.0039 70.20.001.003
BALIZA CONEXIONADO BALIZA 70.20.001.0039 70.20.001.003
BALIZA CONTRASTACION BALIZA 70.20.001.0039 70.20.001.003
BALIZA PROTOCOLO BALIZA 70.20.001.0039 70.20.001.003
70.20.001.0040
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0040 70.20.001.004
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0040 70.20.001.004
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0040 70.20.001.004
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0040 70.20.001.004
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0040 70.20.001.004
70.20.001.0041
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0041 70.20.001.004
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0041 70.20.001.004
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0041 70.20.001.004
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0041 70.20.001.004
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0041 70.20.001.004
70.20.001.0042
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0042 70.20.001.004
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0042 70.20.001.004
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0042 70.20.001.004
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0042 70.20.001.004
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0042 70.20.001.004
70.20.001.0044
SENSOR RECEPCION SENSOR 70.20.001.0044 70.20.001.004
SENSOR MONTAJE SENSOR 70.20.001.0044 70.20.001.004
SENSOR CONEXIONADO SENSOR 70.20.001.0044 70.20.001.004
SENSOR CONTRASTACION SENSOR 70.20.001.0044 70.20.001.004
SENSOR PROTOCOLOS SENSOR 70.20.001.0044 70.20.001.004
70.20.001.0048
DETECCION DE RUPTURRECEPCION UNIDAD DETECCI 70.20.001.0048 70.20.001.004
DETECCION DE RUPTURMONTAJE UNIDAD DETECCIO 70.20.001.0048 70.20.001.004
DETECCION DE RUPTURCONEXIONADO UNIDAD DETE70.20.001.0048 70.20.001.004
DETECCION DE RUPTURCONTRASTACION UNIDAD DET70.20.001.0048 70.20.001.004
DETECCION DE RUPTURPROTOCOLOS UNIDAD DETECC70.20.001.0048 70.20.001.004
70.20.001.0049
SENSOR RECEPCION SENSOR 70.20.001.0049 70.20.001.004
SENSOR MONTAJE SENSOR 70.20.001.0049 70.20.001.004
SENSOR CONEXIONADO SENSOR 70.20.001.0049 70.20.001.004
SENSOR CONTRASTACION SENSOR 70.20.001.0049 70.20.001.004
SENSOR PROTOCOLOS SENSOR 70.20.001.0049 70.20.001.004
70.20.001.0050
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0050 70.20.001.005
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0050 70.20.001.005
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0050 70.20.001.005
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0050 70.20.001.005
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0050 70.20.001.005
70.20.001.0052
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0052 70.20.001.005
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0052 70.20.001.005
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0052 70.20.001.005
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0052 70.20.001.005
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0052 70.20.001.005
70.20.001.0053
SENSOR RECEPCION SENSOR 70.20.001.0053 70.20.001.005
SENSOR MONTAJE SENSOR 70.20.001.0053 70.20.001.005
SENSOR CONEXIONADO SENSOR 70.20.001.0053 70.20.001.005
SENSOR CONTRASTACION SENSOR 70.20.001.0053 70.20.001.005
SENSOR PROTOCOLOS SENSOR 70.20.001.0053 70.20.001.005
70.20.001.00X2
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.00X2 70.20.001.00X
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.00X2 70.20.001.00X
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.00X2 70.20.001.00X
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.00X2 70.20.001.00X
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.00X2 70.20.001.00X
70.20.001.00X3
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.00X3 70.20.001.00X
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.00X3 70.20.001.00X
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.00X3 70.20.001.00X
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.00X3 70.20.001.00X
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.00X3 70.20.001.00X
70.20.005.0001
PANEL RECEPCION PANEL 70.20.005.0001 70.20.005.000
PANEL MONTAJE PANEL 70.20.005.0001 70.20.005.000
PANEL CONEXIONADO PANEL 70.20.005.0001 70.20.005.000
PANEL CONTRASTACION PANEL 70.20.005.0001 70.20.005.000
PANEL PROTOCOLOS PANEL 70.20.005.0001 70.20.005.000
70.20.005.0002
PANEL RECEPCION PANEL 70.20.005.0002 70.20.005.000
PANEL MONTAJE PANEL 70.20.005.0002 70.20.005.000
PANEL CONEXIONADO PANEL 70.20.005.0002 70.20.005.000
PANEL CONTRASTACION PANEL 70.20.005.0002 70.20.005.000
PANEL PROTOCOLOS PANEL 70.20.005.0002 70.20.005.000
70.20.008.0005
PLACA DE MONTAJE RECEPCION PLACAS DE MONTA
70.20.008.0005 70.20.008.000
PLACA DE MONTAJE MONTAJE PLACAS DE MONTAJ70.20.008.0005 70.20.008.000
PLACA DE MONTAJE CONEXIONADO PLACAS DE MO70.20.008.0005 70.20.008.000
PLACA DE MONTAJE CONTRASTACION PLACAS DE 70.20.008.0005 70.20.008.000
PLACA DE MONTAJE PROTOCOLOS PLACA DE MONT70.20.008.0005 70.20.008.000
70.40.002.0002
CAJA DE CONEXION RECEPCION INSTRUMENTOS 70.40.002.0002 70.40.002.000
CAJA DE CONEXION MONTAJE INSTRUMENTOS 70.40.002.0002 70.40.002.000
CAJA DE CONEXION CONEXIONADO INSTRUMENTO70.40.002.0002 70.40.002.000
CAJA DE CONEXION CONTRASTACION INSTRUMEN70.40.002.0002 70.40.002.000
CAJA DE CONEXION PROTOCOLOS INSTRUMENTOS70.40.002.0002 70.40.002.000
70.40.002.0005
RACK REMOTO RECEPCION INSTRUMENTOS 70.40.002.0005 70.40.002.000
RACK REMOTO MONTAJE INSTRUMENTOS 70.40.002.0005 70.40.002.000
RACK REMOTO CONEXIONADO INSTRUMENTO70.40.002.0005 70.40.002.000
RACK REMOTO CONTRASTACION INSTRUMEN70.40.002.0005 70.40.002.000
RACK REMOTO PROTOCOLOS INSTRUMENTOS70.40.002.0005 70.40.002.000
70.60.001.0002
CAMARA CCTV RECEPCION INSTRUMENTOS 70.60.001.0002 70.60.001.000
CAMARA CCTV MONTAJE INSTRUMENTOS 70.60.001.0002 70.60.001.000
CAMARA CCTV CONEXIONADO INSTRUMENTO70.60.001.0002 70.60.001.000
CAMARA CCTV CONTRASTACION INSTRUMEN70.60.001.0002 70.60.001.000
CAMARA CCTV PROTOCOLOS INSTRUMENTOS70.60.001.0002 70.60.001.000
70.60.001.0003
GABINETE CCTV RECEPCION INSTRUMENTOS 70.60.001.0003 70.60.001.000
GABINETE CCTV MONTAJE INSTRUMENTOS 70.60.001.0003 70.60.001.000
GABINETE CCTV CONEXIONADO INSTRUMENTO70.60.001.0003 70.60.001.000
GABINETE CCTV CONTRASTACION INSTRUMEN70.60.001.0003 70.60.001.000
GABINETE CCTV PROTOCOLOS INSTRUMENTOS70.60.001.0003 70.60.001.000

10.20.001.0001
PERNO SUMINISTRO Y COLOCACION 10.20.001.0001 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0001 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0001 10.20.001.000
10.20.001.0002
PERNO SUMINISTRO Y COLOCACION 10.20.001.0002 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0002 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0002 10.20.001.000
10.20.001.0101
PERNO SUMINISTRO Y COLOCACION 10.20.001.0101 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0101 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0101 10.20.001.010
10.20.001.0102
PERNO SUMINISTRO Y COLOCACION 10.20.001.0102 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0102 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0102 10.20.001.010
10.20.001.0003
PERNO SUMINISTRO Y COLOCACION 10.20.001.0003 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0003 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0003 10.20.001.000
10.20.001.0004
PERNO SUMINISTRO Y COLOCACION 10.20.001.0004 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0004 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0004 10.20.001.000
10.20.001.0103
PERNO SUMINISTRO Y COLOCACION 10.20.001.0103 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0103 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0103 10.20.001.010
10.20.001.0104
PERNO SUMINISTRO Y COLOCACION 10.20.001.0104 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0104 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0104 10.20.001.010
10.20.001.0008
PERNO SUMINISTRO Y COLOCACION 10.20.001.0008 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0008 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0008 10.20.001.000
10.20.001.0108
PERNO SUMINISTRO Y COLOCACION 10.20.001.0108 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0108 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0108 10.20.001.010
10.20.001.0012
PERNO SUMINISTRO Y COLOCACION 10.20.001.0012 10.20.001.001
PERNO LIMPIEZA PERNO 10.20.001.0012 10.20.001.001
PERNO PROTOCOLO PERNO 10.20.001.0012 10.20.001.001
10.20.001.0112
PERNO SUMINISTRO Y COLOCACION 10.20.001.0112 10.20.001.011
PERNO LIMPIEZA PERNO 10.20.001.0112 10.20.001.011
PERNO PROTOCOLO PERNO 10.20.001.0112 10.20.001.011
10.20.002.0001
PERNO SUMINISTRO Y COLOCACION 10.20.002.0001 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0001 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0001 10.20.002.000
10.20.002.0002
PERNO SUMINISTRO Y COLOCACION 10.20.002.0002 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0002 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0002 10.20.002.000
10.40.001.0005
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0005 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0005 10.40.001.000
10.40.001.0006
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0006 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0006 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0006 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0006 10.40.001.000
10.40.001.0009
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0009 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0009 10.40.001.000
10.40.001.0010
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0010 10.40.001.001
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0010 10.40.001.001
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0010 10.40.001.001
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0010 10.40.001.001
10.40.001.0011
ACERO REFUERZO DUR SUMINISTRO DE ACERO REFU 10.40.001.0011 10.40.001.001
ACERO REFUERZO DUR CORTADO ACERO REFUERZO 10.40.001.0011 10.40.001.001
ACERO REFUERZO DUR DOBLADO ACERO REFUERZO 10.40.001.0011 10.40.001.001
ACERO REFUERZO DUR PUNCH LIST ACERO REFUERZO10.40.001.0011 10.40.001.001
10.40.001.0027
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0027 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0027 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0027 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0027 10.40.001.002
10.40.002.2805
CONCRETO COLOCACION ACERO 10.40.002.2805 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2805 10.40.002.280
10.40.002.2806
CONCRETO COLOCACION ACERO 10.40.002.2806 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2806 10.40.002.280
10.40.002.2809
CONCRETO COLOCACION ACERO 10.40.002.2809 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2809 10.40.002.280
10.40.002.2810
CONCRETO COLOCACION ACERO 10.40.002.2810 10.40.002.281
CONCRETO ENCOFRADO CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO VACIADO CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO DESCIMBRE CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO LIMPIEZA CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO PUNCH LIST CONCRETO 10.40.002.2810 10.40.002.281
10.40.002.2811
CONCRETO DURMIENTECOLOCACION ACERO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEENCOFRADO CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTETOPOGRAFIA CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEVACIADO CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEDESCIMBRE CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTELIMPIEZA CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEPUNCH LIST CONCRETO 10.40.002.2811 10.40.002.281
10.40.002.3527
CONCRETO COLOCACION ACERO 10.40.002.3527 10.40.002.352
CONCRETO ENCOFRADO CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO VACIADO CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO DESCIMBRE CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO LIMPIEZA CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO PUNCH LIST CONCRETO 10.40.002.3527 10.40.002.352
10.60.002.1061
SOLADO ENCOFRADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO VACIADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO DESCIMBRE CONCRETO 10.60.002.1061 10.60.002.106
SOLADO LIMPIEZA CONCRETO 10.60.002.1061 10.60.002.106
SOLADO PUNCH LIST CONCRETO 10.60.002.1061 10.60.002.106

20.10.001.0003
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0003 20.10.001.000
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0003 20.10.001.000
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0003 20.10.001.000
20.10.001.0103
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0103 20.10.001.010
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0103 20.10.001.010
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0103 20.10.001.010
20.10.001.0203
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0203 20.10.001.020
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0203 20.10.001.020
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0203 20.10.001.020
20.10.001.0303
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0303 20.10.001.030
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0303 20.10.001.030
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0303 20.10.001.030
20.10.001.0403
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0403 20.10.001.040
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0403 20.10.001.040
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0403 20.10.001.040
20.10.001.0503
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0503 20.10.001.050
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0503 20.10.001.050
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0503 20.10.001.050
20.10.005.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.005.0003 20.10.005.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.005.0003 20.10.005.000
20.10.006.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.006.0003 20.10.006.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.006.0003 20.10.006.000
20.10.009.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0003 20.10.009.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0003 20.10.009.000
20.10.009.0103
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0103 20.10.009.010
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0103 20.10.009.010
20.10.009.0203
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0203 20.10.009.020
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0203 20.10.009.020
30.10.001.2001
REVESTIMIENTO ARMADO Y MONTAJE REVEST 30.10.001.2001 30.10.001.20010
REVESTIMIENTO FIJACIONES REVESTIMIENTO 30.10.001.2001 30.10.001.20010
REVESTIMIENTO PROTOCOLOS REVESTIMIENTO30.10.001.2001 30.10.001.20010
30.10.002.2001
REVESTIMIENTO ARMADO Y MONTAJE REVEST 30.10.002.2001 30.10.002.20010
REVESTIMIENTO FIJACIONES REVESTIMIENTO 30.10.002.2001 30.10.002.20010
REVESTIMIENTO PROTOCOLOS REVESTIMIENTO30.10.002.2001 30.10.002.20010

40.30.001.5016
VENTILACION RECEPCION VENTILADOR 40.30.001.5016 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5016 40.30.001.501
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5016 40.30.001.501
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5016 40.30.001.501
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5016 40.30.001.501
40.30.001.5017
VENTILACION RECEPCION VENTILADOR 40.30.001.5017 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5017 40.30.001.501
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5017 40.30.001.501
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5017 40.30.001.501
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5017 40.30.001.501
40.30.001.5018
VENTILACION RECEPCION VENTILADOR 40.30.001.5018 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5018 40.30.001.501
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5018 40.30.001.501
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5018 40.30.001.501
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5018 40.30.001.501
40.60.001.1707
BOMBA SUMINISTRO BOMBA 40.60.001.1707 40.60.001.170
BOMBA MONTAJE BOMBA 40.60.001.1707 40.60.001.170
BOMBA CONEXIONADO BOMBA 40.60.001.1707 40.60.001.170
BOMBA PROTOCOLO BOMBA 40.60.001.1707 40.60.001.170
40.60.001.1708
MOTOR ELECTRICO RECEPCION MOTOR ELECTRIC 40.60.001.1708 40.60.001.170
MOTOR ELECTRICO MONTAJE BOMBA 40.60.001.1708 40.60.001.170
MOTOR ELECTRICO CONEXIONADO MOTOR ELECT40.60.001.1708 40.60.001.170
MOTOR ELECTRICO PROTOCOLOS MOTOR ELECTRI40.60.001.1708 40.60.001.170
40.70.001.3801
SUPRESOR DE POLVO RECEPCION SUPRESOR POLVO40.70.001.3801 40.70.001.380
SUPRESOR DE POLVO MONTAJE SUPRESOR POLVO 40.70.001.3801 40.70.001.380
SUPRESOR DE POLVO CONEXIONADO SUPRESOR PO40.70.001.3801 40.70.001.380
SUPRESOR DE POLVO PROTOCOLO SUPRESOR POLV 40.70.001.3801 40.70.001.380
40.70.001.3802
SUPRESOR DE POLVO RECEPCION SUPRESOR POLVO40.70.001.3802 40.70.001.380
SUPRESOR DE POLVO MONTAJE SUPRESOR POLVO 40.70.001.3802 40.70.001.380
SUPRESOR DE POLVO CONEXIONADO SUPRESOR PO40.70.001.3802 40.70.001.380
SUPRESOR DE POLVO PROTOCOLO SUPRESOR POLV 40.70.001.3802 40.70.001.380
40.70.001.3803
SUPRESOR DE POLVO RECEPCION SUPRESOR POLVO40.70.001.3803 40.70.001.380
SUPRESOR DE POLVO MONTAJE SUPRESOR POLVO 40.70.001.3803 40.70.001.380
SUPRESOR DE POLVO CONEXIONADO SUPRESOR PO40.70.001.3803 40.70.001.380
SUPRESOR DE POLVO PROTOCOLO SUPRESOR POLV 40.70.001.3803 40.70.001.380
40.70.001.3804
SUPRESOR DE POLVO RECEPCION SUPRESOR POLVO40.70.001.3804 40.70.001.380
SUPRESOR DE POLVO MONTAJE SUPRESOR POLVO 40.70.001.3804 40.70.001.380
SUPRESOR DE POLVO CONEXIONADO SUPRESOR PO40.70.001.3804 40.70.001.380
SUPRESOR DE POLVO PROTOCOLO SUPRESOR POLV 40.70.001.3804 40.70.001.380
40.80.001.218
FAJA TRANSPORTADORRECEPCION 40.80.001.218 40.80.001.218
FAJA TRANSPORTADORMONTAJE ELEMENTOS ESTRUC40.80.001.218 40.80.001.218
FAJA TRANSPORTADORMONTAJE ELEMENTOS MECAN40.80.001.218 40.80.001.218
FAJA TRANSPORTADORMONTAJE CHUTES 40.80.001.218 40.80.001.218
FAJA TRANSPORTADORCONEXIONADO Y PRUEBAS 40.80.001.218 40.80.001.218
FAJA TRANSPORTADORPROTOCOLOS ENTREGA 40.80.001.218 40.80.001.218
40.80.001.253
MESAS CARGA RECEPCION 40.80.001.253 40.80.001.253
MESAS CARGA MONTAJE ELEMENTOS ESTRUC40.80.001.253 40.80.001.253
MESAS CARGA MONTAJE ELEMENTOS MECAN40.80.001.253 40.80.001.253
MESAS CARGA MONTAJE CHUTES 40.80.001.253 40.80.001.253
MESAS CARGA CONEXIONADO Y PRUEBAS 40.80.001.253 40.80.001.253
MESAS CARGA PROTOCOLOS ENTREGA 40.80.001.253 40.80.001.253
40.80.001.255
POLEA DE COLA RECEPCION 40.80.001.255 40.80.001.255
POLEA DE COLA MONTAJE ELEMENTOS ESTRUC40.80.001.255 40.80.001.255
POLEA DE COLA MONTAJE ELEMENTOS MECAN40.80.001.255 40.80.001.255
POLEA DE COLA MONTAJE CHUTES 40.80.001.255 40.80.001.255
POLEA DE COLA CONEXIONADO Y PRUEBAS 40.80.001.255 40.80.001.255
POLEA DE COLA PROTOCOLOS ENTREGA 40.80.001.255 40.80.001.255
40.80.001.258
MOTOR ELECTRICO GEARECEPCION 40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEAMONTAJE ELEMENTOS ESTRUC40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEAMONTAJE ELEMENTOS MECAN40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEAMONTAJE CHUTES 40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEACONEXIONADO Y PRUEBAS 40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEAPROTOCOLOS ENTREGA 40.80.001.258 40.80.001.258
40.80.001.259
MOTOR ELECTRICO GEARECEPCION 40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEAMONTAJE ELEMENTOS ESTRUC40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEAMONTAJE ELEMENTOS MECAN40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEAMONTAJE CHUTES 40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEACONEXIONADO Y PRUEBAS 40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEAPROTOCOLOS ENTREGA 40.80.001.259 40.80.001.259
40.80.001.260
BALANZA FAJA RECEPCION 40.80.001.260 40.80.001.260
BALANZA FAJA MONTAJE ELEMENTOS ESTRUC40.80.001.260 40.80.001.260
BALANZA FAJA MONTAJE ELEMENTOS MECAN40.80.001.260 40.80.001.260
BALANZA FAJA MONTAJE CHUTES 40.80.001.260 40.80.001.260
BALANZA FAJA CONEXIONADO Y PRUEBAS 40.80.001.260 40.80.001.260
BALANZA FAJA PROTOCOLOS ENTREGA 40.80.001.260 40.80.001.260
40.80.001.263
FRENO POLEA MOTRIZ RECEPCION 40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ MONTAJE ELEMENTOS ESTRUC40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ MONTAJE ELEMENTOS MECAN40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ MONTAJE CHUTES 40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ CONEXIONADO Y PRUEBAS 40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ PROTOCOLOS ENTREGA 40.80.001.263 40.80.001.263
40.80.001.264
MOTOR BOMBA POLEARECEPCION 40.80.001.264 40.80.001.264
MOTOR BOMBA POLEAMONTAJE ELEMENTOS ESTRUC40.80.001.264 40.80.001.264
MOTOR BOMBA POLEAMONTAJE ELEMENTOS MECAN40.80.001.264 40.80.001.264
MOTOR BOMBA POLEAMONTAJE CHUTES 40.80.001.264 40.80.001.264
MOTOR BOMBA POLEACONEXIONADO Y PRUEBAS 40.80.001.264 40.80.001.264
MOTOR BOMBA POLEAPROTOCOLOS ENTREGA 40.80.001.264 40.80.001.264
40.80.001.265
FRENO POLEA MOTRIZ RECEPCION 40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ MONTAJE ELEMENTOS ESTRUC40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ MONTAJE ELEMENTOS MECAN40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ MONTAJE CHUTES 40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ CONEXIONADO Y PRUEBAS 40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ PROTOCOLOS ENTREGA 40.80.001.265 40.80.001.265
40.80.001.266
MOTOR BOMBA POLEARECEPCION 40.80.001.266 40.80.001.266
MOTOR BOMBA POLEAMONTAJE ELEMENTOS ESTRUC40.80.001.266 40.80.001.266
MOTOR BOMBA POLEAMONTAJE ELEMENTOS MECAN40.80.001.266 40.80.001.266
MOTOR BOMBA POLEAMONTAJE CHUTES 40.80.001.266 40.80.001.266
MOTOR BOMBA POLEACONEXIONADO Y PRUEBAS 40.80.001.266 40.80.001.266
MOTOR BOMBA POLEAPROTOCOLOS ENTREGA 40.80.001.266 40.80.001.266
40.80.001.267
FRENO CABESTRANTE RECEPCION 40.80.001.267 40.80.001.267
FRENO CABESTRANTE MONTAJE ELEMENTOS ESTRUC40.80.001.267 40.80.001.267
FRENO CABESTRANTE MONTAJE ELEMENTOS MECAN40.80.001.267 40.80.001.267
FRENO CABESTRANTE MONTAJE CHUTES 40.80.001.267 40.80.001.267
FRENO CABESTRANTE CONEXIONADO Y PRUEBAS 40.80.001.267 40.80.001.267
FRENO CABESTRANTE PROTOCOLOS ENTREGA 40.80.001.267 40.80.001.267
40.80.001.270
BOMBA 1 ENFRIAMIEN RECEPCION 40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN MONTAJE ELEMENTOS ESTRUC40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN MONTAJE ELEMENTOS MECAN40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN MONTAJE CHUTES 40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN CONEXIONADO Y PRUEBAS 40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN PROTOCOLOS ENTREGA 40.80.001.270 40.80.001.270
40.80.001.271
BOMBA 2 ENFRIAMIEN RECEPCION 40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN MONTAJE ELEMENTOS ESTRUC40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN MONTAJE ELEMENTOS MECAN40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN MONTAJE CHUTES 40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN CONEXIONADO Y PRUEBAS 40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN PROTOCOLOS ENTREGA 40.80.001.271 40.80.001.271
40.80.001.272
UNIDAD DE ENFRIAMIERECEPCION 40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS ESTRUC40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS MECAN40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIEMONTAJE CHUTES 40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIECONEXIONADO Y PRUEBAS 40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIEPROTOCOLOS ENTREGA 40.80.001.272 40.80.001.272
40.80.001.273
UNIDAD DE ENFRIAMIERECEPCION 40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS ESTRUC40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS MECAN40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIEMONTAJE CHUTES 40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIECONEXIONADO Y PRUEBAS 40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIEPROTOCOLOS ENTREGA 40.80.001.273 40.80.001.273
40.80.001.274
UNIDAD DE ENFRIAMIERECEPCION 40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS ESTRUC40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS MECAN40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIEMONTAJE CHUTES 40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIECONEXIONADO Y PRUEBAS 40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIEPROTOCOLOS ENTREGA 40.80.001.274 40.80.001.274
40.80.001.275
PANEL DE CONTROL SI RECEPCION 40.80.001.275 40.80.001.275
PANEL DE CONTROL SI MONTAJE ELEMENTOS ESTRUC40.80.001.275 40.80.001.275
PANEL DE CONTROL SI MONTAJE ELEMENTOS MECAN40.80.001.275 40.80.001.275
PANEL DE CONTROL SI MONTAJE CHUTES 40.80.001.275 40.80.001.275
PANEL DE CONTROL SI CONEXIONADO Y PRUEBAS 40.80.001.275 40.80.001.275
PANEL DE CONTROL SI PROTOCOLOS ENTREGA 40.80.001.275 40.80.001.275
40.80.001.276
IDLER GUARDING RECEPCION 40.80.001.276 40.80.001.276
IDLER GUARDING MONTAJE ELEMENTOS ESTRUC40.80.001.276 40.80.001.276
IDLER GUARDING MONTAJE ELEMENTOS MECAN40.80.001.276 40.80.001.276
IDLER GUARDING MONTAJE CHUTES 40.80.001.276 40.80.001.276
IDLER GUARDING CONEXIONADO Y PRUEBAS 40.80.001.276 40.80.001.276
IDLER GUARDING PROTOCOLOS ENTREGA 40.80.001.276 40.80.001.276

70.20.001.0003
PESOMETRO RECEPCION PESOMETRO 70.20.001.0003 70.20.001.000
PESOMETRO MONTAJE PESOMETRO 70.20.001.0003 70.20.001.000
PESOMETRO CONEXIONADO PESOMETRO 70.20.001.0003 70.20.001.000
PESOMETRO CONTRASTACION PESOMETRO70.20.001.0003 70.20.001.000
PESOMETRO PROTOCOLOS PESOMETRO 70.20.001.0003 70.20.001.000
70.20.001.0015
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0015 70.20.001.001
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0015 70.20.001.001
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0015 70.20.001.001
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0015 70.20.001.001
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0015 70.20.001.001
70.20.001.0016
INDICADOR RECEPCION INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR MONTAJE INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR CONEXIONADO INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR CONTRASTACION INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR PROTOCOLOS INDICADOR 70.20.001.0016 70.20.001.001
70.20.001.0020
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0020 70.20.001.002
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0020 70.20.001.002
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0020 70.20.001.002
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0020 70.20.001.002
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0020 70.20.001.002
70.20.001.0031
SENSOR RECEPCION SENSOR 70.20.001.0031 70.20.001.003
SENSOR MONTAJE SENSOR 70.20.001.0031 70.20.001.003
SENSOR CONEXIONADO SENSOR 70.20.001.0031 70.20.001.003
SENSOR CONTRASTACION SENSOR 70.20.001.0031 70.20.001.003
SENSOR PROTOCOLOS SENSOR 70.20.001.0031 70.20.001.003
70.20.001.0032
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0032 70.20.001.003
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0032 70.20.001.003
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0032 70.20.001.003
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0032 70.20.001.003
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0032 70.20.001.003
70.20.001.0038
SIRENA RECEPCION SIRENA 70.20.001.0038 70.20.001.003
SIRENA MONTAJE SIRENA 70.20.001.0038 70.20.001.003
SIRENA CONEXIONADO SIRENA 70.20.001.0038 70.20.001.003
SIRENA CONTRASTACION SIRENA 70.20.001.0038 70.20.001.003
SIRENA PROTOCOLOS SIRENA 70.20.001.0038 70.20.001.003
70.20.001.0039
BALIZA RECEPCION BALIZA 70.20.001.0039 70.20.001.003
BALIZA MONTAJE BALIZA 70.20.001.0039 70.20.001.003
BALIZA CONEXIONADO BALIZA 70.20.001.0039 70.20.001.003
BALIZA CONTRASTACION BALIZA 70.20.001.0039 70.20.001.003
BALIZA PROTOCOLO BALIZA 70.20.001.0039 70.20.001.003
70.20.001.0040
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0040 70.20.001.004
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0040 70.20.001.004
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0040 70.20.001.004
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0040 70.20.001.004
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0040 70.20.001.004
70.20.001.0041
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0041 70.20.001.004
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0041 70.20.001.004
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0041 70.20.001.004
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0041 70.20.001.004
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0041 70.20.001.004
70.20.001.0042
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0042 70.20.001.004
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0042 70.20.001.004
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0042 70.20.001.004
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0042 70.20.001.004
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0042 70.20.001.004
70.20.001.0044
SENSOR RECEPCION SENSOR 70.20.001.0044 70.20.001.004
SENSOR MONTAJE SENSOR 70.20.001.0044 70.20.001.004
SENSOR CONEXIONADO SENSOR 70.20.001.0044 70.20.001.004
SENSOR CONTRASTACION SENSOR 70.20.001.0044 70.20.001.004
SENSOR PROTOCOLOS SENSOR 70.20.001.0044 70.20.001.004
70.20.001.0048
DETECCION DE RUPTURRECEPCION UNIDAD DETECCI 70.20.001.0048 70.20.001.004
DETECCION DE RUPTURMONTAJE UNIDAD DETECCIO 70.20.001.0048 70.20.001.004
DETECCION DE RUPTURCONEXIONADO UNIDAD DETE70.20.001.0048 70.20.001.004
DETECCION DE RUPTURCONTRASTACION UNIDAD DET70.20.001.0048 70.20.001.004
DETECCION DE RUPTURPROTOCOLOS UNIDAD DETECC70.20.001.0048 70.20.001.004
70.20.001.0049
SENSOR RECEPCION SENSOR 70.20.001.0049 70.20.001.004
SENSOR MONTAJE SENSOR 70.20.001.0049 70.20.001.004
SENSOR CONEXIONADO SENSOR 70.20.001.0049 70.20.001.004
SENSOR CONTRASTACION SENSOR 70.20.001.0049 70.20.001.004
SENSOR PROTOCOLOS SENSOR 70.20.001.0049 70.20.001.004
70.20.001.0050
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0050 70.20.001.005
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0050 70.20.001.005
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0050 70.20.001.005
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0050 70.20.001.005
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0050 70.20.001.005
70.20.001.0052
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0052 70.20.001.005
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0052 70.20.001.005
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0052 70.20.001.005
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0052 70.20.001.005
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0052 70.20.001.005
70.20.001.0053
SENSOR RECEPCION SENSOR 70.20.001.0053 70.20.001.005
SENSOR MONTAJE SENSOR 70.20.001.0053 70.20.001.005
SENSOR CONEXIONADO SENSOR 70.20.001.0053 70.20.001.005
SENSOR CONTRASTACION SENSOR 70.20.001.0053 70.20.001.005
SENSOR PROTOCOLOS SENSOR 70.20.001.0053 70.20.001.005
70.20.001.00X2
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.00X2 70.20.001.00X
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.00X2 70.20.001.00X
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.00X2 70.20.001.00X
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.00X2 70.20.001.00X
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.00X2 70.20.001.00X
70.20.001.00X3
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.00X3 70.20.001.00X
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.00X3 70.20.001.00X
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.00X3 70.20.001.00X
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.00X3 70.20.001.00X
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.00X3 70.20.001.00X
70.20.005.0001
PANEL RECEPCION PANEL 70.20.005.0001 70.20.005.000
PANEL MONTAJE PANEL 70.20.005.0001 70.20.005.000
PANEL CONEXIONADO PANEL 70.20.005.0001 70.20.005.000
PANEL CONTRASTACION PANEL 70.20.005.0001 70.20.005.000
PANEL PROTOCOLOS PANEL 70.20.005.0001 70.20.005.000
70.20.005.0002
PANEL RECEPCION PANEL 70.20.005.0002 70.20.005.000
PANEL MONTAJE PANEL 70.20.005.0002 70.20.005.000
PANEL CONEXIONADO PANEL 70.20.005.0002 70.20.005.000
PANEL CONTRASTACION PANEL 70.20.005.0002 70.20.005.000
PANEL PROTOCOLOS PANEL 70.20.005.0002 70.20.005.000
70.20.008.0005
PLACA DE MONTAJE RECEPCION PLACAS DE MONTA
70.20.008.0005 70.20.008.000
PLACA DE MONTAJE MONTAJE PLACAS DE MONTAJ70.20.008.0005 70.20.008.000
PLACA DE MONTAJE CONEXIONADO PLACAS DE MO70.20.008.0005 70.20.008.000
PLACA DE MONTAJE CONTRASTACION PLACAS DE 70.20.008.0005 70.20.008.000
PLACA DE MONTAJE PROTOCOLOS PLACA DE MONT70.20.008.0005 70.20.008.000
70.40.002.0002
CAJA DE CONEXION RECEPCION INSTRUMENTOS 70.40.002.0002 70.40.002.000
CAJA DE CONEXION MONTAJE INSTRUMENTOS 70.40.002.0002 70.40.002.000
CAJA DE CONEXION CONEXIONADO INSTRUMENTO70.40.002.0002 70.40.002.000
CAJA DE CONEXION CONTRASTACION INSTRUMEN70.40.002.0002 70.40.002.000
CAJA DE CONEXION PROTOCOLOS INSTRUMENTOS70.40.002.0002 70.40.002.000
70.40.002.0005
RACK REMOTO RECEPCION INSTRUMENTOS 70.40.002.0005 70.40.002.000
RACK REMOTO MONTAJE INSTRUMENTOS 70.40.002.0005 70.40.002.000
RACK REMOTO CONEXIONADO INSTRUMENTO70.40.002.0005 70.40.002.000
RACK REMOTO CONTRASTACION INSTRUMEN70.40.002.0005 70.40.002.000
RACK REMOTO PROTOCOLOS INSTRUMENTOS70.40.002.0005 70.40.002.000
70.60.001.0002
CAMARA CCTV RECEPCION INSTRUMENTOS 70.60.001.0002 70.60.001.000
CAMARA CCTV MONTAJE INSTRUMENTOS 70.60.001.0002 70.60.001.000
CAMARA CCTV CONEXIONADO INSTRUMENTO70.60.001.0002 70.60.001.000
CAMARA CCTV CONTRASTACION INSTRUMEN70.60.001.0002 70.60.001.000
CAMARA CCTV PROTOCOLOS INSTRUMENTOS70.60.001.0002 70.60.001.000
70.60.001.0003
GABINETE CCTV RECEPCION INSTRUMENTOS 70.60.001.0003 70.60.001.000
GABINETE CCTV MONTAJE INSTRUMENTOS 70.60.001.0003 70.60.001.000
GABINETE CCTV CONEXIONADO INSTRUMENTO70.60.001.0003 70.60.001.000
GABINETE CCTV CONTRASTACION INSTRUMEN70.60.001.0003 70.60.001.000
GABINETE CCTV PROTOCOLOS INSTRUMENTOS70.60.001.0003 70.60.001.000

10.20.001.0001
PERNO SUMINISTRO Y COLOCACION 10.20.001.0001 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0001 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0001 10.20.001.000
10.20.001.0002
PERNO SUMINISTRO Y COLOCACION 10.20.001.0002 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0002 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0002 10.20.001.000
10.20.001.0101
PERNO SUMINISTRO Y COLOCACION 10.20.001.0101 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0101 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0101 10.20.001.010
10.20.001.0102
PERNO SUMINISTRO Y COLOCACION 10.20.001.0102 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0102 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0102 10.20.001.010
10.20.001.0003
PERNO SUMINISTRO Y COLOCACION 10.20.001.0003 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0003 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0003 10.20.001.000
10.20.001.0004
PERNO SUMINISTRO Y COLOCACION 10.20.001.0004 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0004 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0004 10.20.001.000
10.20.001.0103
PERNO SUMINISTRO Y COLOCACION 10.20.001.0103 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0103 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0103 10.20.001.010
10.20.001.0104
PERNO SUMINISTRO Y COLOCACION 10.20.001.0104 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0104 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0104 10.20.001.010
10.20.001.0008
PERNO SUMINISTRO Y COLOCACION 10.20.001.0008 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0008 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0008 10.20.001.000
10.20.001.0108
PERNO SUMINISTRO Y COLOCACION 10.20.001.0108 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0108 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0108 10.20.001.010
10.20.001.0012
PERNO SUMINISTRO Y COLOCACION 10.20.001.0012 10.20.001.001
PERNO LIMPIEZA PERNO 10.20.001.0012 10.20.001.001
PERNO PROTOCOLO PERNO 10.20.001.0012 10.20.001.001
10.20.001.0112
PERNO SUMINISTRO Y COLOCACION 10.20.001.0112 10.20.001.011
PERNO LIMPIEZA PERNO 10.20.001.0112 10.20.001.011
PERNO PROTOCOLO PERNO 10.20.001.0112 10.20.001.011
10.20.002.0001
PERNO SUMINISTRO Y COLOCACION 10.20.002.0001 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0001 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0001 10.20.002.000
10.20.002.0002
PERNO SUMINISTRO Y COLOCACION 10.20.002.0002 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0002 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0002 10.20.002.000
10.40.001.0005
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0005 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0005 10.40.001.000
10.40.001.0006
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0006 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0006 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0006 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0006 10.40.001.000
10.40.001.0009
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0009 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0009 10.40.001.000
10.40.001.0010
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0010 10.40.001.001
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0010 10.40.001.001
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0010 10.40.001.001
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0010 10.40.001.001
10.40.001.0011
ACERO REFUERZO DUR SUMINISTRO DE ACERO REFU 10.40.001.0011 10.40.001.001
ACERO REFUERZO DUR CORTADO ACERO REFUERZO 10.40.001.0011 10.40.001.001
ACERO REFUERZO DUR DOBLADO ACERO REFUERZO 10.40.001.0011 10.40.001.001
ACERO REFUERZO DUR PUNCH LIST ACERO REFUERZO10.40.001.0011 10.40.001.001
10.40.001.0027
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0027 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0027 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0027 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0027 10.40.001.002
10.40.002.2805
CONCRETO COLOCACION ACERO 10.40.002.2805 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2805 10.40.002.280
10.40.002.2806
CONCRETO COLOCACION ACERO 10.40.002.2806 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2806 10.40.002.280
10.40.002.2809
CONCRETO COLOCACION ACERO 10.40.002.2809 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2809 10.40.002.280
10.40.002.2810
CONCRETO COLOCACION ACERO 10.40.002.2810 10.40.002.281
CONCRETO ENCOFRADO CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO VACIADO CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO DESCIMBRE CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO LIMPIEZA CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO PUNCH LIST CONCRETO 10.40.002.2810 10.40.002.281
10.40.002.2811
CONCRETO DURMIENTECOLOCACION ACERO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEENCOFRADO CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTETOPOGRAFIA CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEVACIADO CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEDESCIMBRE CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTELIMPIEZA CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEPUNCH LIST CONCRETO 10.40.002.2811 10.40.002.281
10.40.002.3527
CONCRETO COLOCACION ACERO 10.40.002.3527 10.40.002.352
CONCRETO ENCOFRADO CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO VACIADO CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO DESCIMBRE CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO LIMPIEZA CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO PUNCH LIST CONCRETO 10.40.002.3527 10.40.002.352
10.60.002.1061
SOLADO ENCOFRADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO VACIADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO DESCIMBRE CONCRETO 10.60.002.1061 10.60.002.106
SOLADO LIMPIEZA CONCRETO 10.60.002.1061 10.60.002.106
SOLADO PUNCH LIST CONCRETO 10.60.002.1061 10.60.002.106

20.10.001.0003
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0003 20.10.001.000
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0003 20.10.001.000
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0003 20.10.001.000
20.10.001.0103
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0103 20.10.001.010
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0103 20.10.001.010
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0103 20.10.001.010
20.10.001.0203
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0203 20.10.001.020
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0203 20.10.001.020
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0203 20.10.001.020
20.10.001.0303
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0303 20.10.001.030
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0303 20.10.001.030
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0303 20.10.001.030
20.10.001.0403
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0403 20.10.001.040
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0403 20.10.001.040
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0403 20.10.001.040
20.10.001.0503
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0503 20.10.001.050
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0503 20.10.001.050
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0503 20.10.001.050
20.10.005.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.005.0003 20.10.005.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.005.0003 20.10.005.000
20.10.006.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.006.0003 20.10.006.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.006.0003 20.10.006.000
20.10.009.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0003 20.10.009.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0003 20.10.009.000
20.10.009.0103
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0103 20.10.009.010
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0103 20.10.009.010
20.10.009.0203
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0203 20.10.009.020
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0203 20.10.009.020

30.10.001.2001
REVESTIMIENTO ARMADO Y MONTAJE REVEST 30.10.001.2001 30.10.001.20010
REVESTIMIENTO FIJACIONES REVESTIMIENTO 30.10.001.2001 30.10.001.20010
REVESTIMIENTO PROTOCOLOS REVESTIMIENTO30.10.001.2001 30.10.001.20010
30.10.002.2001
REVESTIMIENTO ARMADO Y MONTAJE REVEST 30.10.002.2001 30.10.002.20010
REVESTIMIENTO FIJACIONES REVESTIMIENTO 30.10.002.2001 30.10.002.20010
REVESTIMIENTO PROTOCOLOS REVESTIMIENTO30.10.002.2001 30.10.002.20010

40.30.001.5016
VENTILACION RECEPCION VENTILADOR 40.30.001.5016 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5016 40.30.001.501
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5016 40.30.001.501
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5016 40.30.001.501
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5016 40.30.001.501
40.30.001.5017
VENTILACION RECEPCION VENTILADOR 40.30.001.5017 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5017 40.30.001.501
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5017 40.30.001.501
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5017 40.30.001.501
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5017 40.30.001.501
40.30.001.5018
VENTILACION RECEPCION VENTILADOR 40.30.001.5018 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5018 40.30.001.501
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5018 40.30.001.501
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5018 40.30.001.501
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5018 40.30.001.501
40.60.001.1707
BOMBA SUMINISTRO BOMBA 40.60.001.1707 40.60.001.170
BOMBA MONTAJE BOMBA 40.60.001.1707 40.60.001.170
BOMBA CONEXIONADO BOMBA 40.60.001.1707 40.60.001.170
BOMBA PROTOCOLO BOMBA 40.60.001.1707 40.60.001.170
40.60.001.1708
MOTOR ELECTRICO RECEPCION MOTOR ELECTRIC 40.60.001.1708 40.60.001.170
MOTOR ELECTRICO MONTAJE BOMBA 40.60.001.1708 40.60.001.170
MOTOR ELECTRICO CONEXIONADO MOTOR ELECT40.60.001.1708 40.60.001.170
MOTOR ELECTRICO PROTOCOLOS MOTOR ELECTRI40.60.001.1708 40.60.001.170
40.70.001.3801
SUPRESOR DE POLVO RECEPCION SUPRESOR POLVO40.70.001.3801 40.70.001.380
SUPRESOR DE POLVO MONTAJE SUPRESOR POLVO 40.70.001.3801 40.70.001.380
SUPRESOR DE POLVO CONEXIONADO SUPRESOR PO40.70.001.3801 40.70.001.380
SUPRESOR DE POLVO PROTOCOLO SUPRESOR POLV 40.70.001.3801 40.70.001.380
40.70.001.3802
SUPRESOR DE POLVO RECEPCION SUPRESOR POLVO40.70.001.3802 40.70.001.380
SUPRESOR DE POLVO MONTAJE SUPRESOR POLVO 40.70.001.3802 40.70.001.380
SUPRESOR DE POLVO CONEXIONADO SUPRESOR PO40.70.001.3802 40.70.001.380
SUPRESOR DE POLVO PROTOCOLO SUPRESOR POLV 40.70.001.3802 40.70.001.380
40.70.001.3803
SUPRESOR DE POLVO RECEPCION SUPRESOR POLVO40.70.001.3803 40.70.001.380
SUPRESOR DE POLVO MONTAJE SUPRESOR POLVO 40.70.001.3803 40.70.001.380
SUPRESOR DE POLVO CONEXIONADO SUPRESOR PO40.70.001.3803 40.70.001.380
SUPRESOR DE POLVO PROTOCOLO SUPRESOR POLV 40.70.001.3803 40.70.001.380
40.70.001.3804
SUPRESOR DE POLVO RECEPCION SUPRESOR POLVO40.70.001.3804 40.70.001.380
SUPRESOR DE POLVO MONTAJE SUPRESOR POLVO 40.70.001.3804 40.70.001.380
SUPRESOR DE POLVO CONEXIONADO SUPRESOR PO40.70.001.3804 40.70.001.380
SUPRESOR DE POLVO PROTOCOLO SUPRESOR POLV 40.70.001.3804 40.70.001.380
40.80.001.218
FAJA TRANSPORTADORRECEPCION 40.80.001.218 40.80.001.218
FAJA TRANSPORTADORMONTAJE ELEMENTOS ESTRUC40.80.001.218 40.80.001.218
FAJA TRANSPORTADORMONTAJE ELEMENTOS MECAN40.80.001.218 40.80.001.218
FAJA TRANSPORTADORMONTAJE CHUTES 40.80.001.218 40.80.001.218
FAJA TRANSPORTADORCONEXIONADO Y PRUEBAS 40.80.001.218 40.80.001.218
FAJA TRANSPORTADORPROTOCOLOS ENTREGA 40.80.001.218 40.80.001.218
40.80.001.253
MESAS CARGA RECEPCION 40.80.001.253 40.80.001.253
MESAS CARGA MONTAJE ELEMENTOS ESTRUC40.80.001.253 40.80.001.253
MESAS CARGA MONTAJE ELEMENTOS MECAN40.80.001.253 40.80.001.253
MESAS CARGA MONTAJE CHUTES 40.80.001.253 40.80.001.253
MESAS CARGA CONEXIONADO Y PRUEBAS 40.80.001.253 40.80.001.253
MESAS CARGA PROTOCOLOS ENTREGA 40.80.001.253 40.80.001.253
40.80.001.255
POLEA DE COLA RECEPCION 40.80.001.255 40.80.001.255
POLEA DE COLA MONTAJE ELEMENTOS ESTRUC40.80.001.255 40.80.001.255
POLEA DE COLA MONTAJE ELEMENTOS MECAN40.80.001.255 40.80.001.255
POLEA DE COLA MONTAJE CHUTES 40.80.001.255 40.80.001.255
POLEA DE COLA CONEXIONADO Y PRUEBAS 40.80.001.255 40.80.001.255
POLEA DE COLA PROTOCOLOS ENTREGA 40.80.001.255 40.80.001.255
40.80.001.258
MOTOR ELECTRICO GEARECEPCION 40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEAMONTAJE ELEMENTOS ESTRUC40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEAMONTAJE ELEMENTOS MECAN40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEAMONTAJE CHUTES 40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEACONEXIONADO Y PRUEBAS 40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEAPROTOCOLOS ENTREGA 40.80.001.258 40.80.001.258
40.80.001.259
MOTOR ELECTRICO GEARECEPCION 40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEAMONTAJE ELEMENTOS ESTRUC40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEAMONTAJE ELEMENTOS MECAN40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEAMONTAJE CHUTES 40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEACONEXIONADO Y PRUEBAS 40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEAPROTOCOLOS ENTREGA 40.80.001.259 40.80.001.259
40.80.001.260
BALANZA FAJA RECEPCION 40.80.001.260 40.80.001.260
BALANZA FAJA MONTAJE ELEMENTOS ESTRUC40.80.001.260 40.80.001.260
BALANZA FAJA MONTAJE ELEMENTOS MECAN40.80.001.260 40.80.001.260
BALANZA FAJA MONTAJE CHUTES 40.80.001.260 40.80.001.260
BALANZA FAJA CONEXIONADO Y PRUEBAS 40.80.001.260 40.80.001.260
BALANZA FAJA PROTOCOLOS ENTREGA 40.80.001.260 40.80.001.260
40.80.001.263
FRENO POLEA MOTRIZ RECEPCION 40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ MONTAJE ELEMENTOS ESTRUC40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ MONTAJE ELEMENTOS MECAN40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ MONTAJE CHUTES 40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ CONEXIONADO Y PRUEBAS 40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ PROTOCOLOS ENTREGA 40.80.001.263 40.80.001.263
40.80.001.264
MOTOR BOMBA POLEARECEPCION 40.80.001.264 40.80.001.264
MOTOR BOMBA POLEAMONTAJE ELEMENTOS ESTRUC40.80.001.264 40.80.001.264
MOTOR BOMBA POLEAMONTAJE ELEMENTOS MECAN40.80.001.264 40.80.001.264
MOTOR BOMBA POLEAMONTAJE CHUTES 40.80.001.264 40.80.001.264
MOTOR BOMBA POLEACONEXIONADO Y PRUEBAS 40.80.001.264 40.80.001.264
MOTOR BOMBA POLEAPROTOCOLOS ENTREGA 40.80.001.264 40.80.001.264
40.80.001.265
FRENO POLEA MOTRIZ RECEPCION 40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ MONTAJE ELEMENTOS ESTRUC40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ MONTAJE ELEMENTOS MECAN40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ MONTAJE CHUTES 40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ CONEXIONADO Y PRUEBAS 40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ PROTOCOLOS ENTREGA 40.80.001.265 40.80.001.265
40.80.001.266
MOTOR BOMBA POLEARECEPCION 40.80.001.266 40.80.001.266
MOTOR BOMBA POLEAMONTAJE ELEMENTOS ESTRUC40.80.001.266 40.80.001.266
MOTOR BOMBA POLEAMONTAJE ELEMENTOS MECAN40.80.001.266 40.80.001.266
MOTOR BOMBA POLEAMONTAJE CHUTES 40.80.001.266 40.80.001.266
MOTOR BOMBA POLEACONEXIONADO Y PRUEBAS 40.80.001.266 40.80.001.266
MOTOR BOMBA POLEAPROTOCOLOS ENTREGA 40.80.001.266 40.80.001.266
40.80.001.267
FRENO CABESTRANTE RECEPCION 40.80.001.267 40.80.001.267
FRENO CABESTRANTE MONTAJE ELEMENTOS ESTRUC40.80.001.267 40.80.001.267
FRENO CABESTRANTE MONTAJE ELEMENTOS MECAN40.80.001.267 40.80.001.267
FRENO CABESTRANTE MONTAJE CHUTES 40.80.001.267 40.80.001.267
FRENO CABESTRANTE CONEXIONADO Y PRUEBAS 40.80.001.267 40.80.001.267
FRENO CABESTRANTE PROTOCOLOS ENTREGA 40.80.001.267 40.80.001.267
40.80.001.270
BOMBA 1 ENFRIAMIEN RECEPCION 40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN MONTAJE ELEMENTOS ESTRUC40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN MONTAJE ELEMENTOS MECAN40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN MONTAJE CHUTES 40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN CONEXIONADO Y PRUEBAS 40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN PROTOCOLOS ENTREGA 40.80.001.270 40.80.001.270
40.80.001.271
BOMBA 2 ENFRIAMIEN RECEPCION 40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN MONTAJE ELEMENTOS ESTRUC40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN MONTAJE ELEMENTOS MECAN40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN MONTAJE CHUTES 40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN CONEXIONADO Y PRUEBAS 40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN PROTOCOLOS ENTREGA 40.80.001.271 40.80.001.271
40.80.001.272
UNIDAD DE ENFRIAMIERECEPCION 40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS ESTRUC40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS MECAN40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIEMONTAJE CHUTES 40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIECONEXIONADO Y PRUEBAS 40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIEPROTOCOLOS ENTREGA 40.80.001.272 40.80.001.272
40.80.001.273
UNIDAD DE ENFRIAMIERECEPCION 40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS ESTRUC40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS MECAN40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIEMONTAJE CHUTES 40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIECONEXIONADO Y PRUEBAS 40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIEPROTOCOLOS ENTREGA 40.80.001.273 40.80.001.273
40.80.001.274
UNIDAD DE ENFRIAMIERECEPCION 40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS ESTRUC40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS MECAN40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIEMONTAJE CHUTES 40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIECONEXIONADO Y PRUEBAS 40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIEPROTOCOLOS ENTREGA 40.80.001.274 40.80.001.274
40.80.001.275
PANEL DE CONTROL SI RECEPCION 40.80.001.275 40.80.001.275
PANEL DE CONTROL SI MONTAJE ELEMENTOS ESTRUC40.80.001.275 40.80.001.275
PANEL DE CONTROL SI MONTAJE ELEMENTOS MECAN40.80.001.275 40.80.001.275
PANEL DE CONTROL SI MONTAJE CHUTES 40.80.001.275 40.80.001.275
PANEL DE CONTROL SI CONEXIONADO Y PRUEBAS 40.80.001.275 40.80.001.275
PANEL DE CONTROL SI PROTOCOLOS ENTREGA 40.80.001.275 40.80.001.275
40.80.001.276
IDLER GUARDING RECEPCION 40.80.001.276 40.80.001.276
IDLER GUARDING MONTAJE ELEMENTOS ESTRUC40.80.001.276 40.80.001.276
IDLER GUARDING MONTAJE ELEMENTOS MECAN40.80.001.276 40.80.001.276
IDLER GUARDING MONTAJE CHUTES 40.80.001.276 40.80.001.276
IDLER GUARDING CONEXIONADO Y PRUEBAS 40.80.001.276 40.80.001.276
IDLER GUARDING PROTOCOLOS ENTREGA 40.80.001.276 40.80.001.276

70.20.001.0003
PESOMETRO RECEPCION PESOMETRO 70.20.001.0003 70.20.001.000
PESOMETRO MONTAJE PESOMETRO 70.20.001.0003 70.20.001.000
PESOMETRO CONEXIONADO PESOMETRO 70.20.001.0003 70.20.001.000
PESOMETRO CONTRASTACION PESOMETRO70.20.001.0003 70.20.001.000
PESOMETRO PROTOCOLOS PESOMETRO 70.20.001.0003 70.20.001.000
70.20.001.0015
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0015 70.20.001.001
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0015 70.20.001.001
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0015 70.20.001.001
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0015 70.20.001.001
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0015 70.20.001.001
70.20.001.0016
INDICADOR RECEPCION INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR MONTAJE INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR CONEXIONADO INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR CONTRASTACION INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR PROTOCOLOS INDICADOR 70.20.001.0016 70.20.001.001
70.20.001.0020
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0020 70.20.001.002
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0020 70.20.001.002
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0020 70.20.001.002
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0020 70.20.001.002
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0020 70.20.001.002
70.20.001.0031
SENSOR RECEPCION SENSOR 70.20.001.0031 70.20.001.003
SENSOR MONTAJE SENSOR 70.20.001.0031 70.20.001.003
SENSOR CONEXIONADO SENSOR 70.20.001.0031 70.20.001.003
SENSOR CONTRASTACION SENSOR 70.20.001.0031 70.20.001.003
SENSOR PROTOCOLOS SENSOR 70.20.001.0031 70.20.001.003
70.20.001.0032
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0032 70.20.001.003
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0032 70.20.001.003
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0032 70.20.001.003
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0032 70.20.001.003
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0032 70.20.001.003
70.20.001.0038
SIRENA RECEPCION SIRENA 70.20.001.0038 70.20.001.003
SIRENA MONTAJE SIRENA 70.20.001.0038 70.20.001.003
SIRENA CONEXIONADO SIRENA 70.20.001.0038 70.20.001.003
SIRENA CONTRASTACION SIRENA 70.20.001.0038 70.20.001.003
SIRENA PROTOCOLOS SIRENA 70.20.001.0038 70.20.001.003
70.20.001.0039
BALIZA RECEPCION BALIZA 70.20.001.0039 70.20.001.003
BALIZA MONTAJE BALIZA 70.20.001.0039 70.20.001.003
BALIZA CONEXIONADO BALIZA 70.20.001.0039 70.20.001.003
BALIZA CONTRASTACION BALIZA 70.20.001.0039 70.20.001.003
BALIZA PROTOCOLO BALIZA 70.20.001.0039 70.20.001.003
70.20.001.0040
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0040 70.20.001.004
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0040 70.20.001.004
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0040 70.20.001.004
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0040 70.20.001.004
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0040 70.20.001.004
70.20.001.0041
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0041 70.20.001.004
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0041 70.20.001.004
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0041 70.20.001.004
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0041 70.20.001.004
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0041 70.20.001.004
70.20.001.0042
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0042 70.20.001.004
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0042 70.20.001.004
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0042 70.20.001.004
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0042 70.20.001.004
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0042 70.20.001.004
70.20.001.0044
SENSOR RECEPCION SENSOR 70.20.001.0044 70.20.001.004
SENSOR MONTAJE SENSOR 70.20.001.0044 70.20.001.004
SENSOR CONEXIONADO SENSOR 70.20.001.0044 70.20.001.004
SENSOR CONTRASTACION SENSOR 70.20.001.0044 70.20.001.004
SENSOR PROTOCOLOS SENSOR 70.20.001.0044 70.20.001.004
70.20.001.0048
DETECCION DE RUPTURRECEPCION UNIDAD DETECCI 70.20.001.0048 70.20.001.004
DETECCION DE RUPTURMONTAJE UNIDAD DETECCIO 70.20.001.0048 70.20.001.004
DETECCION DE RUPTURCONEXIONADO UNIDAD DETE70.20.001.0048 70.20.001.004
DETECCION DE RUPTURCONTRASTACION UNIDAD DET70.20.001.0048 70.20.001.004
DETECCION DE RUPTURPROTOCOLOS UNIDAD DETECC70.20.001.0048 70.20.001.004
70.20.001.0049
SENSOR RECEPCION SENSOR 70.20.001.0049 70.20.001.004
SENSOR MONTAJE SENSOR 70.20.001.0049 70.20.001.004
SENSOR CONEXIONADO SENSOR 70.20.001.0049 70.20.001.004
SENSOR CONTRASTACION SENSOR 70.20.001.0049 70.20.001.004
SENSOR PROTOCOLOS SENSOR 70.20.001.0049 70.20.001.004
70.20.001.0050
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0050 70.20.001.005
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0050 70.20.001.005
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0050 70.20.001.005
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0050 70.20.001.005
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0050 70.20.001.005
70.20.001.0052
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0052 70.20.001.005
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0052 70.20.001.005
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0052 70.20.001.005
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0052 70.20.001.005
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0052 70.20.001.005
70.20.001.0053
SENSOR RECEPCION SENSOR 70.20.001.0053 70.20.001.005
SENSOR MONTAJE SENSOR 70.20.001.0053 70.20.001.005
SENSOR CONEXIONADO SENSOR 70.20.001.0053 70.20.001.005
SENSOR CONTRASTACION SENSOR 70.20.001.0053 70.20.001.005
SENSOR PROTOCOLOS SENSOR 70.20.001.0053 70.20.001.005
70.20.001.00X2
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.00X2 70.20.001.00X
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.00X2 70.20.001.00X
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.00X2 70.20.001.00X
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.00X2 70.20.001.00X
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.00X2 70.20.001.00X
70.20.001.00X3
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.00X3 70.20.001.00X
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.00X3 70.20.001.00X
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.00X3 70.20.001.00X
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.00X3 70.20.001.00X
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.00X3 70.20.001.00X
70.20.005.0001
PANEL RECEPCION PANEL 70.20.005.0001 70.20.005.000
PANEL MONTAJE PANEL 70.20.005.0001 70.20.005.000
PANEL CONEXIONADO PANEL 70.20.005.0001 70.20.005.000
PANEL CONTRASTACION PANEL 70.20.005.0001 70.20.005.000
PANEL PROTOCOLOS PANEL 70.20.005.0001 70.20.005.000
70.20.005.0002
PANEL RECEPCION PANEL 70.20.005.0002 70.20.005.000
PANEL MONTAJE PANEL 70.20.005.0002 70.20.005.000
PANEL CONEXIONADO PANEL 70.20.005.0002 70.20.005.000
PANEL CONTRASTACION PANEL 70.20.005.0002 70.20.005.000
PANEL PROTOCOLOS PANEL 70.20.005.0002 70.20.005.000
70.20.008.0005
PLACA DE MONTAJE RECEPCION PLACAS DE MONTA
70.20.008.0005 70.20.008.000
PLACA DE MONTAJE MONTAJE PLACAS DE MONTAJ70.20.008.0005 70.20.008.000
PLACA DE MONTAJE CONEXIONADO PLACAS DE MO70.20.008.0005 70.20.008.000
PLACA DE MONTAJE CONTRASTACION PLACAS DE 70.20.008.0005 70.20.008.000
PLACA DE MONTAJE PROTOCOLOS PLACA DE MONT70.20.008.0005 70.20.008.000
70.40.002.0002
CAJA DE CONEXION RECEPCION INSTRUMENTOS 70.40.002.0002 70.40.002.000
CAJA DE CONEXION MONTAJE INSTRUMENTOS 70.40.002.0002 70.40.002.000
CAJA DE CONEXION CONEXIONADO INSTRUMENTO70.40.002.0002 70.40.002.000
CAJA DE CONEXION CONTRASTACION INSTRUMEN70.40.002.0002 70.40.002.000
CAJA DE CONEXION PROTOCOLOS INSTRUMENTOS70.40.002.0002 70.40.002.000
70.40.002.0005
RACK REMOTO RECEPCION INSTRUMENTOS 70.40.002.0005 70.40.002.000
RACK REMOTO MONTAJE INSTRUMENTOS 70.40.002.0005 70.40.002.000
RACK REMOTO CONEXIONADO INSTRUMENTO70.40.002.0005 70.40.002.000
RACK REMOTO CONTRASTACION INSTRUMEN70.40.002.0005 70.40.002.000
RACK REMOTO PROTOCOLOS INSTRUMENTOS70.40.002.0005 70.40.002.000
70.60.001.0002
CAMARA CCTV RECEPCION INSTRUMENTOS 70.60.001.0002 70.60.001.000
CAMARA CCTV MONTAJE INSTRUMENTOS 70.60.001.0002 70.60.001.000
CAMARA CCTV CONEXIONADO INSTRUMENTO70.60.001.0002 70.60.001.000
CAMARA CCTV CONTRASTACION INSTRUMEN70.60.001.0002 70.60.001.000
CAMARA CCTV PROTOCOLOS INSTRUMENTOS70.60.001.0002 70.60.001.000
70.60.001.0003
GABINETE CCTV RECEPCION INSTRUMENTOS 70.60.001.0003 70.60.001.000
GABINETE CCTV MONTAJE INSTRUMENTOS 70.60.001.0003 70.60.001.000
GABINETE CCTV CONEXIONADO INSTRUMENTO70.60.001.0003 70.60.001.000
GABINETE CCTV CONTRASTACION INSTRUMEN70.60.001.0003 70.60.001.000
GABINETE CCTV PROTOCOLOS INSTRUMENTOS70.60.001.0003 70.60.001.000

10.20.001.0003
PERNO SUMINISTRO Y COLOCACION 10.20.001.0003 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0003 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0003 10.20.001.000
10.20.001.0004
PERNO SUMINISTRO Y COLOCACION 10.20.001.0004 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0004 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0004 10.20.001.000
10.20.001.0103
PERNO SUMINISTRO Y COLOCACION 10.20.001.0103 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0103 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0103 10.20.001.010
10.20.001.0104
PERNO SUMINISTRO Y COLOCACION 10.20.001.0104 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0104 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0104 10.20.001.010
10.20.001.0008
PERNO SUMINISTRO Y COLOCACION 10.20.001.0008 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0008 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0008 10.20.001.000
10.20.001.0108
PERNO SUMINISTRO Y COLOCACION 10.20.001.0108 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0108 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0108 10.20.001.010
10.20.002.0001
PERNO SUMINISTRO Y COLOCACION 10.20.002.0001 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0001 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0001 10.20.002.000
10.20.002.0002
PERNO SUMINISTRO Y COLOCACION 10.20.002.0002 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0002 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0002 10.20.002.000
10.40.001.0008
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0008 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0008 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0008 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0008 10.40.001.000
10.40.001.0040
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0040 10.40.001.004
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0040 10.40.001.004
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0040 10.40.001.004
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0040 10.40.001.004
10.40.002.2808
CONCRETO COLOCACION ACERO 10.40.002.2808 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2808 10.40.002.280
10.40.002.2840
CONCRETO COLOCACION ACERO 10.40.002.2840 10.40.002.284
CONCRETO ENCOFRADO CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO VACIADO CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO DESCIMBRE CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO LIMPIEZA CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO PUNCH LIST CONCRETO 10.40.002.2840 10.40.002.284
10.60.002.1061
SOLADO COLOCACION ACERO 10.60.002.1061 10.60.002.106
SOLADO VACIADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO DESCIMBRE CONCRETO 10.60.002.1061 10.60.002.106
SOLADO LIMPIEZA CONCRETO 10.60.002.1061 10.60.002.106
SOLADO PUNCH LIST CONCRETO 10.60.002.1061 10.60.002.106

51.20.004.0005
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0005 51.20.004.0005
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0005 51.20.004.0005
51.20.004.0007
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0007 51.20.004.0007
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0007 51.20.004.0007
51.20.004.0015
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0015 51.20.004.0015
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0015 51.20.004.0015
51.20.004.0025
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0025 51.20.004.0025
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0025 51.20.004.0025
51.20.004.0028
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0028 51.20.004.0028
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0028 51.20.004.0028
51.20.004.0030
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0030 51.20.004.0030
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0030 51.20.004.0030
51.20.004.0044
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0044 51.20.004.0044
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0044 51.20.004.0044
51.20.004.0066
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0066 51.20.004.0066
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0066 51.20.004.0066
51.20.004.0068
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0068 51.20.004.0068
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0068 51.20.004.0068
51.20.004.0070
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0070 51.20.004.0070
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0070 51.20.004.0070
51.20.004.0076
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0076 51.20.004.0076
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0076 51.20.004.0076
51.20.004.0078
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0078 51.20.004.0078
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0078 51.20.004.0078
51.20.004.0080
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0080 51.20.004.0080
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0080 51.20.004.0080
51.20.004.0114
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0114 51.20.004.0114
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0114 51.20.004.0114
51.30.001.0010
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0010 51.30.001.0010
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0010 51.30.001.0010
51.40.001.0003
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0003 51.40.001.0003
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0003 51.40.001.0003
51.40.001.0008
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0008 51.40.001.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0008 51.40.001.000
51.40.001.0014
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0014 51.40.001.0014
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0014 51.40.001.0014
51.40.001.0025
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0025 51.40.001.0025
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0025 51.40.001.0025
51.40.007.0019
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0019 51.40.007.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0019 51.40.007.001
51.60.101.0003
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0003 51.60.101.0003
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0003 51.60.101.0003
51.60.101.0008
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0008 51.60.101.0008
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0008 51.60.101.0008
51.60.101.0012
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0012 51.60.101.0012
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0012 51.60.101.0012
51.60.101.0018
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0018 51.60.101.0018
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0018 51.60.101.0018
51.60.101.0020
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0020 51.60.101.0020
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0020 51.60.101.0020
52.20.001.0020
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.001.0020 52.20.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0020 52.20.001.002
52.20.001.0044
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.001.0044 52.20.001.004
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0044 52.20.001.004
52.20.001.0049
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.001.0049 52.20.001.004
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0049 52.20.001.004
52.20.003.0056
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0056 52.20.003.0056
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0056 52.20.003.0056
52.20.003.0069
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0069 52.20.003.0069
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0069 52.20.003.0069
52.20.003.0077
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0077 52.20.003.0077
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0077 52.20.003.0077
52.30.001.0010
INSTALACION DE TUBERFABRICACION DE TUBERIAS 52.30.001.0010 52.30.001.0010
INSTALACION DE TUBERFABRICACION DE TUBERIAS 52.30.001.0010 52.30.001.0010
52.40.006.0019
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0019 52.40.006.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0019 52.40.006.001

70.20.001.0029
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0029 70.20.001.0029
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0029 70.20.001.0029
TRANSMISOR CONEXIONADO TRANSMISOR 70.20.001.0029 70.20.001.0029
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0029 70.20.001.0029
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0029 70.20.001.0029
70.20.001.0035
INDICADOR RECEPCION INDICADOR 70.20.001.0035 70.20.001.0035
INDICADOR MONTAJE INDICADOR 70.20.001.0035 70.20.001.0035
INDICADOR CONEXIONADO INDICADOR 70.20.001.0035 70.20.001.0035
INDICADOR CONTRASTACION INDICADOR 70.20.001.0035 70.20.001.0035
INDICADOR PROTOCOLOS INDICADOR 70.20.001.0035 70.20.001.0035
70.20.001.00X4
ACTUADOR RECEPCION ACTUADOR 70.20.001.00X4 70.20.001.00X4
ACTUADOR MONTAJE ACTUADOR 70.20.001.00X4 70.20.001.00X4
ACTUADOR CONEXIONADO ACTUADOR 70.20.001.00X4 70.20.001.00X4
ACTUADOR CONTRASTACION ACTUADOR 70.20.001.00X4 70.20.001.00X4
ACTUADOR PROTOCOLO ACTUADOR 70.20.001.00X4 70.20.001.00X4
00.25.001.0001
EXCAVACION EXCAVACION PARA PUESTA A T00.25.001.0001 00.25.001.000
00.25.001.0002
EXCAVACION EXCAVACION PARA CONDUIT 00.25.001.0002 00.25.001.000
00.25.003.0001
EXCAVACION EXCAVACION PARA BANCODUC00.25.003.0001 00.25.003.000
00.30.002.0001
RELLENO RELLENO PARA PUESTA A TIER 00.30.002.0001 00.30.002.000
00.30.002.0002
RELLENO RELLENO PARA CONDUIT 00.30.002.0002 00.30.002.000
00.30.003.0004
RELLENO RELLENO PARA BANCODUCTOS00.30.003.0004 00.30.003.000

10.20.001.0003
PERNO SUMINISTRO Y COLOCACION 10.20.001.0003 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0003 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0003 10.20.001.000
10.20.001.0004
PERNO SUMINISTRO Y COLOCACION 10.20.001.0004 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0004 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0004 10.20.001.000
10.20.001.0103
PERNO SUMINISTRO Y COLOCACION 10.20.001.0103 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0103 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0103 10.20.001.010
10.20.001.0104
PERNO SUMINISTRO Y COLOCACION 10.20.001.0104 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0104 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0104 10.20.001.010
10.20.001.0008
PERNO SUMINISTRO Y COLOCACION 10.20.001.0008 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0008 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0008 10.20.001.000
10.20.001.0108
PERNO SUMINISTRO Y COLOCACION 10.20.001.0108 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0108 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0108 10.20.001.010
10.20.002.0001
PERNO SUMINISTRO Y COLOCACION 10.20.002.0001 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0001 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0001 10.20.002.000
10.20.002.0002
PERNO SUMINISTRO Y COLOCACION 10.20.002.0002 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0002 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0002 10.20.002.000
10.40.001.0008
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0008 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0008 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0008 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0008 10.40.001.000
10.40.001.0026
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0026 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0026 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0026 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0026 10.40.001.002
10.40.001.0040
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0040 10.40.001.004
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0040 10.40.001.004
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0040 10.40.001.004
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0040 10.40.001.004
10.40.002.2808
CONCRETO COLOCACION ACERO 10.40.002.2808 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2808 10.40.002.280
10.40.002.2826
CONCRETO COLOCACION ACERO 10.40.002.2826 10.40.002.282
CONCRETO ENCOFRADO CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO VACIADO CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO DESCIMBRE CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO LIMPIEZA CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO PUNCH LIST CONCRETO 10.40.002.2826 10.40.002.282
10.40.002.2840
CONCRETO COLOCACION ACERO 10.40.002.2840 10.40.002.284
CONCRETO ENCOFRADO CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO VACIADO CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO DESCIMBRE CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO LIMPIEZA CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO PUNCH LIST CONCRETO 10.40.002.2840 10.40.002.284
10.60.002.1061
SOLADO ENCOFRADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO VACIADO CONCRETO 10.60.002.1061 10.60.002.1061
SOLADO DESCIMBRE CONCRETO 10.60.002.1061 10.60.002.106
SOLADO LIMPIEZA CONCRETO 10.60.002.1061 10.60.002.1061
SOLADO PUNCH LIST CONCRETO 10.60.002.1061 10.60.002.1061

10.20.001.0003
PERNO SUMINISTRO Y COLOCACION 10.20.001.0003 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0003 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0003 10.20.001.000
10.20.001.0004
PERNO SUMINISTRO Y COLOCACION 10.20.001.0004 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0004 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0004 10.20.001.000
10.20.001.0103
PERNO SUMINISTRO Y COLOCACION 10.20.001.0103 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0103 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0103 10.20.001.010
10.20.001.0104
PERNO SUMINISTRO Y COLOCACION 10.20.001.0104 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0104 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0104 10.20.001.010
10.20.001.0008
PERNO SUMINISTRO Y COLOCACION 10.20.001.0008 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0008 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0008 10.20.001.000
10.20.001.0108
PERNO SUMINISTRO Y COLOCACION 10.20.001.0108 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0108 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0108 10.20.001.010
10.20.002.0001
PERNO SUMINISTRO Y COLOCACION 10.20.002.0001 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0001 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0001 10.20.002.000
10.20.002.0002
PERNO SUMINISTRO Y COLOCACION 10.20.002.0002 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0002 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0002 10.20.002.000
10.40.001.0005
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0005 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0005 10.40.001.000
10.40.001.0008
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0008 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0008 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0008 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0008 10.40.001.000
10.40.001.0040
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0040 10.40.001.004
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0040 10.40.001.004
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0040 10.40.001.004
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0040 10.40.001.004
10.40.001.0069
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0069 10.40.001.006
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0069 10.40.001.006
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0069 10.40.001.006
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0069 10.40.001.006
10.40.002.2169
CONCRETO COLOCACION ACERO 10.40.002.2169 10.40.002.216
CONCRETO ENCOFRADO CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO VACIADO CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO DESCIMBRE CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO LIMPIEZA CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO PUNCH LIST CONCRETO 10.40.002.2169 10.40.002.216
10.40.002.2805
CONCRETO COLOCACION ACERO 10.40.002.2805 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2805 10.40.002.280
10.40.002.2808
CONCRETO COLOCACION ACERO 10.40.002.2808 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2808 10.40.002.280
10.40.002.2840
CONCRETO COLOCACION ACERO 10.40.002.2840 10.40.002.284
CONCRETO ENCOFRADO CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO VACIADO CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO DESCIMBRE CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO LIMPIEZA CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO PUNCH LIST CONCRETO 10.40.002.2840 10.40.002.284
10.60.002.1061
SOLADO ENCOFRADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO VACIADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO DESCIMBRE CONCRETO 10.60.002.1061 10.60.002.106
SOLADO LIMPIEZA CONCRETO 10.60.002.1061 10.60.002.106
SOLADO PUNCH LIST CONCRETO 10.60.002.1061 10.60.002.106

51.20.004.0001
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0001 51.20.004.0001
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0001 51.20.004.0001
51.20.004.0005
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0005 51.20.004.0005
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0005 51.20.004.0005
51.20.004.0043
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0043 51.20.004.0043
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0043 51.20.004.0043
51.20.004.0046
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0046 51.20.004.0046
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0046 51.20.004.0046
51.20.004.0064
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0064 51.20.004.0064
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0064 51.20.004.0064
51.20.004.0066
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0066 51.20.004.0066
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0066 51.20.004.0066
51.20.004.0071
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0071 51.20.004.0071
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0071 51.20.004.0071
51.20.004.0074
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0074 51.20.004.0074
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0074 51.20.004.0074
51.20.004.0075
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0075 51.20.004.0075
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0075 51.20.004.0075
51.20.004.0076
FABRICACION DE TUBERFABRICACION DE TUBERIAS M51.20.004.0076 51.20.004.0076
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.004.0076 51.20.004.0076
51.30.001.0002
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0002 51.30.001.000
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0002 51.30.001.0002
51.30.001.0003
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0003 51.30.001.0003
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0003 51.30.001.0003
51.30.001.0004
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0004 51.30.001.0004
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0004 51.30.001.0004
51.30.001.0010
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0010 51.30.001.0010
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0010 51.30.001.0010
51.30.001.0011
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0011 51.30.001.0011
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0011 51.30.001.0011
51.30.001.0012
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0012 51.30.001.0012
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0012 51.30.001.0012
51.30.001.0016
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0016 51.30.001.001
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0016 51.30.001.0016
51.40.001.0012
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0012 51.40.001.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0012 51.40.001.0012
51.40.001.0014
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0014 51.40.001.0014
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0014 51.40.001.0014
51.40.001.0025
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0025 51.40.001.0025
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0025 51.40.001.0025
51.40.007.0013
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0013 51.40.007.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0013 51.40.007.001
51.40.007.0015
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0015 51.40.007.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0015 51.40.007.001
51.40.007.0016
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0016 51.40.007.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0016 51.40.007.001
51.40.007.0019
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0019 51.40.007.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0019 51.40.007.001
51.40.007.0020
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0020 51.40.007.002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0020 51.40.007.002
51.40.007.0024
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0024 51.40.007.002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0024 51.40.007.002
51.60.101.0014
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0014 51.60.101.0014
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0014 51.60.101.0014
51.60.101.0015
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0015 51.60.101.0015
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0015 51.60.101.0015
51.60.101.0017
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0017 51.60.101.0017
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0017 51.60.101.0017
51.60.101.0018
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0018 51.60.101.0018
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0018 51.60.101.0018
51.60.101.0021
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0021 51.60.101.0021
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0021 51.60.101.0021
52.20.001.0014
INSTALACION DE TUBERFABRICACION DE TUBERIAS 52.20.001.0014 52.20.001.0014
INSTALACION DE TUBERFABRICACION DE TUBERIAS 52.20.001.0014 52.20.001.0014
52.20.001.0016
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0016 52.20.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0016 52.20.001.001
52.20.001.0017
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0017 52.20.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0017 52.20.001.001
52.20.001.0020
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0020 52.20.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0020 52.20.001.002
52.20.001.0021
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0021 52.20.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0021 52.20.001.002
52.20.001.0025
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0025 52.20.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0025 52.20.001.002
52.20.001.0047
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0047 52.20.001.004
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0047 52.20.001.004
52.20.001.0051
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0051 52.20.001.005
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0051 52.20.001.005
52.20.003.0018
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0018 52.20.003.0018
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0018 52.20.003.0018
52.20.003.0028
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0028 52.20.003.0028
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0028 52.20.003.0028
52.20.003.0054
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0054 52.20.003.0054
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0054 52.20.003.0054
52.20.003.0057
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0057 52.20.003.0057
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0057 52.20.003.0057
52.20.003.0058
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0058 52.20.003.0058
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0058 52.20.003.0058
52.20.003.0063
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0063 52.20.003.0063
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0063 52.20.003.0063
52.20.003.0065
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0065 52.20.003.0065
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0065 52.20.003.0065
52.20.003.0066
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0066 52.20.003.0066
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0066 52.20.003.0066
52.20.003.0067
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0067 52.20.003.0067
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0067 52.20.003.0067
52.20.003.0069
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0069 52.20.003.0069
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0069 52.20.003.0069
52.20.003.0073
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0073 52.20.003.0073
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0073 52.20.003.0073
52.20.003.0074
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0074 52.20.003.0074
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0074 52.20.003.0074
52.20.003.0078
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0078 52.20.003.0078
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0078 52.20.003.0078
52.20.003.0081
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0081 52.20.003.0081
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0081 52.20.003.0081
52.20.003.0087
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0087 52.20.003.0087
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0087 52.20.003.0087
52.20.003.0093
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0093 52.20.003.0093
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0093 52.20.003.0093
52.30.001.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.30.001.0002 52.30.001.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0002 52.30.001.0002
52.30.001.0003
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0003 52.30.001.0003
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0003 52.30.001.0003
52.30.001.0004
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0004 52.30.001.0004
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0004 52.30.001.0004
52.30.001.0010
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0010 52.30.001.0010
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0010 52.30.001.0010
52.30.001.0011
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0011 52.30.001.0011
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0011 52.30.001.0011
52.30.001.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0012 52.30.001.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0012 52.30.001.0012
52.30.001.0016
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0016 52.30.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0016 52.30.001.001
52.40.006.0013
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0013 52.40.006.0013
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0013 52.40.006.0013
52.40.006.0015
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0015 52.40.006.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0015 52.40.006.001
52.40.006.0016
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0016 52.40.006.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0016 52.40.006.001
52.40.006.0019
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0019 52.40.006.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0019 52.40.006.001
52.40.006.0020
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0020 52.40.006.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0020 52.40.006.002
52.40.006.0024
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0024 52.40.006.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0024 52.40.006.002

70.20.001.0009
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0009 70.20.001.0009
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0009 70.20.001.0009
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0009 70.20.001.0009
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0009 70.20.001.0009
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0009 70.20.001.0009
70.20.001.0022
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0022 70.20.001.0022
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0022 70.20.001.0022
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0022 70.20.001.0022
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0022 70.20.001.0022
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0022 70.20.001.0022
70.20.001.0025
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0025 70.20.001.0025
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0025 70.20.001.0025
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0025 70.20.001.0025
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0025 70.20.001.0025
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0025 70.20.001.0025
70.20.001.00X4
ACTUADOR RECEPCION ACTUADOR 70.20.001.00X4 70.20.001.00X4
ACTUADOR MONTAJE ACTUADOR 70.20.001.00X4 70.20.001.00X4
ACTUADOR CONEXIONADO ACTUADOR 70.20.001.00X4 70.20.001.00X4
ACTUADOR CONTRASTACION ACTUADOR 70.20.001.00X4 70.20.001.00X4
ACTUADOR PROTOCOLO ACTUADOR 70.20.001.00X4 70.20.001.00X4
70.40.002.0005
RACK REMOTO RECEPCION INSTRUMENTOS 70.40.002.0005 70.40.002.0005
RACK REMOTO MONTAJE INSTRUMENTOS 70.40.002.0005 70.40.002.0005
RACK REMOTO CONEXIONADO INSTRUMENTO70.40.002.0005 70.40.002.0005
RACK REMOTO CONTRASTACION INSTRUMEN70.40.002.0005 70.40.002.0005
RACK REMOTO PROTOCOLOS INSTRUMENTOS70.40.002.0005 70.40.002.0005

00.25.002.0007
EXCAVACION EXCAVACION PARA BANCODUC00.25.002.0007 00.25.002.000
00.30.001.0009
RELLENO RELLENO PARA PUESTA A TIER 00.30.001.0009 00.30.001.000
00.30.001.0010
RELLENO RELLENO PARA CONDUIT 00.30.001.0010 00.30.001.001
00.30.001.0011
RELLENO RELLENO PARA CONDUIT 00.30.001.0011 00.30.001.001

51.30.001.0005
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0005 51.30.001.0005
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0005 51.30.001.0005
51.30.001.0009
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0009 51.30.001.000
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0009 51.30.001.0009
51.30.001.0011
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0011 51.30.001.001
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0011 51.30.001.0011
51.40.001.0003
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0003 51.40.001.0003
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0003 51.40.001.0003
51.40.001.0013
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0013 51.40.001.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0013 51.40.001.001
51.40.001.0014
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0014 51.40.001.0014
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0014 51.40.001.0014
51.40.001.0021
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0021 51.40.001.0021
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0021 51.40.001.0021
51.40.001.0022
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0022 51.40.001.0022
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0022 51.40.001.0022
51.40.007.0008
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0008 51.40.007.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0008 51.40.007.000
51.40.007.0009
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0009 51.40.007.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0009 51.40.007.000
51.40.007.0012
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0012 51.40.007.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0012 51.40.007.001
51.40.007.0013
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0013 51.40.007.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0013 51.40.007.001
51.40.007.0021
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0021 51.40.007.002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0021 51.40.007.002
51.40.007.0025
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0025 51.40.007.002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0025 51.40.007.002
51.40.007.0026
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0026 51.40.007.002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0026 51.40.007.002
51.40.007.0027
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0027 51.40.007.002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0027 51.40.007.002
51.60.101.0005
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0005 51.60.101.0005
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0005 51.60.101.0005
51.60.101.0006
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0006 51.60.101.0006
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0006 51.60.101.0006
51.60.101.0007
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0007 51.60.101.0007
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0007 51.60.101.0007
51.60.101.0009
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0009 51.60.101.0009
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0009 51.60.101.0009
51.60.101.0016
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0016 51.60.101.0016
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0016 51.60.101.0016
51.60.101.0018
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0018 51.60.101.0018
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0018 51.60.101.0018
51.60.101.0019
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0019 51.60.101.0019
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0019 51.60.101.0019
51.60.101.0020
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0020 51.60.101.0020
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0020 51.60.101.0020
52.20.001.0008
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.001.0008 52.20.001.0008
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0008 52.20.001.0008
52.20.001.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.001.0009 52.20.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0009 52.20.001.000
52.20.001.0011
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.001.0011 52.20.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0011 52.20.001.001
52.20.001.0013
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.001.0013 52.20.001.0013
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0013 52.20.001.0013
52.20.001.0014
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.001.0014 52.20.001.0014
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0014 52.20.001.0014
52.20.001.0022
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.001.0022 52.20.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0022 52.20.001.002
52.20.003.0001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0001 52.20.003.0001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0001 52.20.003.0001
52.20.003.0006
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0006 52.20.003.0006
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0006 52.20.003.0006
52.20.003.0007
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0007 52.20.003.0007
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0007 52.20.003.0007
52.20.003.0015
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0015 52.20.003.0015
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0015 52.20.003.0015
52.20.003.0017
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0017 52.20.003.0017
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0017 52.20.003.0017
52.20.003.0022
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0022 52.20.003.0022
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0022 52.20.003.0022
52.20.003.0023
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0023 52.20.003.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0023 52.20.003.0023
52.20.003.0025
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0025 52.20.003.0025
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0025 52.20.003.0025
52.20.003.0027
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0027 52.20.003.0027
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0027 52.20.003.0027
52.20.003.0028
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0028 52.20.003.0028
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0028 52.20.003.0028
52.20.003.0032
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0032 52.20.003.0032
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0032 52.20.003.0032
52.20.003.0033
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0033 52.20.003.0033
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0033 52.20.003.0033
52.20.003.0036
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0036 52.20.003.0036
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0036 52.20.003.0036
52.20.003.0039
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0039 52.20.003.0039
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0039 52.20.003.0039
52.20.003.0040
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0040 52.20.003.0040
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0040 52.20.003.0040
52.20.003.0041
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0041 52.20.003.0041
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0041 52.20.003.0041
52.20.003.0049
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0049 52.20.003.0049
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0049 52.20.003.0049
52.20.003.0051
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0051 52.20.003.0051
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0051 52.20.003.0051
52.20.003.0052
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0052 52.20.003.0052
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0052 52.20.003.0052
52.20.003.0070
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0070 52.20.003.0070
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0070 52.20.003.0070
52.20.003.0079
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0079 52.20.003.0079
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0079 52.20.003.0079
52.30.001.0005
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0005 52.30.001.0005
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0005 52.30.001.0005
52.30.001.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0009 52.30.001.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0009 52.30.001.0009
52.30.001.0011
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0011 52.30.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0011 52.30.001.0011
52.30.005.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0002 52.30.005.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0002 52.30.005.000
52.30.005.0003
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0003 52.30.005.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0003 52.30.005.0003
52.30.005.0004
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0004 52.30.005.0004
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0004 52.30.005.0004
52.30.005.0005
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0005 52.30.005.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0005 52.30.005.000
52.30.005.0006
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0006 52.30.005.0006
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0006 52.30.005.0006
52.30.005.0007
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0007 52.30.005.0007
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0007 52.30.005.0007
52.30.005.0008
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0008 52.30.005.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0008 52.30.005.000
52.30.005.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0009 52.30.005.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0009 52.30.005.0009
52.30.005.0010
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0010 52.30.005.0010
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0010 52.30.005.0010
52.30.005.0011
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0011 52.30.005.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0011 52.30.005.001
52.30.005.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0012 52.30.005.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0012 52.30.005.0012
52.30.005.0013
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0013 52.30.005.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0013 52.30.005.0013
52.30.005.0014
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0014 52.30.005.0014
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0014 52.30.005.0014
52.30.005.0015
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0015 52.30.005.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0015 52.30.005.001
52.30.005.0016
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0016 52.30.005.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0016 52.30.005.001
52.30.005.0018
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0018 52.30.005.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0018 52.30.005.001
52.30.005.0019
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0019 52.30.005.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0019 52.30.005.0019
52.30.005.0020
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0020 52.30.005.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0020 52.30.005.0020
52.30.005.0021
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0021 52.30.005.0021
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0021 52.30.005.0021
52.30.005.0022
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0022 52.30.005.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0022 52.30.005.002
52.30.005.0023
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0023 52.30.005.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0023 52.30.005.0023
52.30.005.0053
INSTALACION DE TUBERMONTAJE DE TUBERIAS TER 52.30.005.0053 52.30.005.005
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.005.0053 52.30.005.005
52.40.004.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0002 52.40.004.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0002 52.40.004.0002
52.40.004.0003
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0003 52.40.004.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0003 52.40.004.000
52.40.004.0004
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0004 52.40.004.0004
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0004 52.40.004.0004
52.40.004.0005
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0005 52.40.004.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0005 52.40.004.000
52.40.004.0006
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0006 52.40.004.0006
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0006 52.40.004.0006
52.40.004.0007
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0007 52.40.004.0007
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0007 52.40.004.0007
52.40.004.0008
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0008 52.40.004.0008
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0008 52.40.004.0008
52.40.004.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0009 52.40.004.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0009 52.40.004.0009
52.40.004.0010
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0010 52.40.004.0010
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0010 52.40.004.0010
52.40.004.0011
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0011 52.40.004.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0011 52.40.004.0011
52.40.004.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0012 52.40.004.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0012 52.40.004.0012
52.40.004.0013
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0013 52.40.004.0013
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0013 52.40.004.0013
52.40.004.0014
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0014 52.40.004.0014
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0014 52.40.004.0014
52.40.004.0015
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0015 52.40.004.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0015 52.40.004.001
52.40.004.0016
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0016 52.40.004.0016
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0016 52.40.004.0016
52.40.004.0018
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0018 52.40.004.0018
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0018 52.40.004.0018
52.40.004.0019
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0019 52.40.004.0019
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0019 52.40.004.0019
52.40.004.0020
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0020 52.40.004.0020
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0020 52.40.004.0020
52.40.004.0021
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0021 52.40.004.0021
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0021 52.40.004.0021
52.40.004.0022
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0022 52.40.004.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0022 52.40.004.0022
52.40.004.0023
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0023 52.40.004.0023
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0023 52.40.004.0023
52.40.004.0024
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRU 52.40.004.0024 52.40.004.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.004.0024 52.40.004.0024
52.40.006.0008
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0008 52.40.006.0008
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0008 52.40.006.0008
52.40.006.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0009 52.40.006.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0009 52.40.006.000
52.40.006.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0012 52.40.006.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0012 52.40.006.0012
52.40.006.0013
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0013 52.40.006.0013
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0013 52.40.006.0013
52.40.006.0021
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0021 52.40.006.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0021 52.40.006.002
52.80.003.0001
INSTALACION DE TUBERMONTAJE DE MISCELANEOS 52.80.003.0001 52.80.003.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.80.003.0001 52.80.003.0001
52.80.003.0002
INSTALACION DE TUBERMONTAJE DE MISCELANEOS 52.80.003.0002 52.80.003.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.80.003.0002 52.80.003.0002
52.80.006.0001
INSTALACION DE TUBERMONTAJE DE MISCELANEOS 52.80.006.0001 52.80.006.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.80.006.0001 52.80.006.0001
52.80.006.0002
INSTALACION DE TUBERMONTAJE DE MISCELANEOS 52.80.006.0002 52.80.006.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.80.006.0002 52.80.006.0002
52.80.006.0003
INSTALACION DE TUBERMONTAJE DE MISCELANEOS 52.80.006.0003 52.80.006.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.80.006.0003 52.80.006.0003
52.80.006.0004
INSTALACION DE TUBERMONTAJE DE MISCELANEOS 52.80.006.0004 52.80.006.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.80.006.0004 52.80.006.0004
52.90.001.0001
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0001 52.90.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0001 52.90.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0001 52.90.001.000
52.90.001.0002
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0002 52.90.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0002 52.90.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0002 52.90.001.000
52.90.001.0004
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0004 52.90.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0004 52.90.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0004 52.90.001.000
52.90.001.0005
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0005 52.90.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0005 52.90.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0005 52.90.001.000
52.90.001.0006
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0006 52.90.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0006 52.90.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0006 52.90.001.000
52.90.001.0007
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0007 52.90.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0007 52.90.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0007 52.90.001.000
52.90.001.0008
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0008 52.90.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0008 52.90.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0008 52.90.001.000
52.90.001.0009
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0009 52.90.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0009 52.90.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0009 52.90.001.000
52.90.001.0010
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0010 52.90.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0010 52.90.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0010 52.90.001.001
52.90.001.0011
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0011 52.90.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0011 52.90.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0011 52.90.001.001
52.90.001.0012
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0012 52.90.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0012 52.90.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0012 52.90.001.001
52.90.001.0013
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0013 52.90.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0013 52.90.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0013 52.90.001.001
52.90.001.0014
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0014 52.90.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0014 52.90.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0014 52.90.001.001
52.90.001.0015
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0015 52.90.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0015 52.90.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0015 52.90.001.001
52.90.001.0016
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0016 52.90.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0016 52.90.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0016 52.90.001.001
52.90.001.0017
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0017 52.90.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0017 52.90.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0017 52.90.001.001
52.90.001.0018
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0018 52.90.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0018 52.90.001.001
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0018 52.90.001.001
52.90.001.0020
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0020 52.90.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0020 52.90.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0020 52.90.001.002
52.90.001.0021
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0021 52.90.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0021 52.90.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0021 52.90.001.002
52.90.001.0022
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0022 52.90.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0022 52.90.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0022 52.90.001.002
52.90.001.0023
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0023 52.90.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0023 52.90.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0023 52.90.001.002
52.90.001.0024
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0024 52.90.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0024 52.90.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0024 52.90.001.002
52.90.001.0025
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.001.0025 52.90.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0025 52.90.001.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS ENTE 52.90.001.0025 52.90.001.002
52.90.002.0001
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0001 52.90.002.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0001 52.90.002.0001
52.90.002.0002
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0002 52.90.002.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0002 52.90.002.0002
52.90.002.0003
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0003 52.90.002.0003
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0003 52.90.002.0003
52.90.002.0004
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0004 52.90.002.0004
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0004 52.90.002.0004
52.90.002.0005
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0005 52.90.002.0005
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0005 52.90.002.0005
52.90.002.0006
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0006 52.90.002.0006
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0006 52.90.002.0006
52.90.002.0007
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0007 52.90.002.0007
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0007 52.90.002.0007
52.90.002.0008
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0008 52.90.002.0008
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0008 52.90.002.0008
52.90.002.0009
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0009 52.90.002.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0009 52.90.002.0009
52.90.002.0010
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0010 52.90.002.0010
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0010 52.90.002.0010
52.90.002.0011
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0011 52.90.002.0011
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0011 52.90.002.0011
52.90.002.0012
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0012 52.90.002.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0012 52.90.002.0012
52.90.002.0013
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0013 52.90.002.0013
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0013 52.90.002.0013
52.90.002.0014
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0014 52.90.002.0014
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0014 52.90.002.0014
52.90.002.0015
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0015 52.90.002.0015
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0015 52.90.002.0015
52.90.002.0016
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0016 52.90.002.0016
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0016 52.90.002.0016
52.90.002.0017
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0017 52.90.002.0017
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0017 52.90.002.0017
52.90.002.0018
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0018 52.90.002.0018
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0018 52.90.002.0018
52.90.002.0019
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0019 52.90.002.0019
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0019 52.90.002.0019
52.90.002.0020
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0020 52.90.002.0020
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0020 52.90.002.0020
52.90.002.0021
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0021 52.90.002.0021
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0021 52.90.002.0021
52.90.002.0022
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0022 52.90.002.0022
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0022 52.90.002.0022
52.90.002.0023
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0023 52.90.002.0023
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0023 52.90.002.0023
52.90.002.0024
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0024 52.90.002.0024
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0024 52.90.002.0024
52.90.002.0025
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0025 52.90.002.0025
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0025 52.90.002.0025
52.90.002.0026
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0026 52.90.002.0026
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0026 52.90.002.0026
52.90.002.0027
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0027 52.90.002.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0027 52.90.002.0027
52.90.002.0028
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0028 52.90.002.0028
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0028 52.90.002.0028
52.90.002.0029
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0029 52.90.002.0029
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0029 52.90.002.0029
52.90.002.0030
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0030 52.90.002.0030
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0030 52.90.002.0030
52.90.002.0031
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0031 52.90.002.0031
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0031 52.90.002.0031
52.90.002.0032
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0032 52.90.002.0032
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0032 52.90.002.0032
52.90.002.0033
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0033 52.90.002.0033
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0033 52.90.002.0033
52.90.002.0034
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0034 52.90.002.0034
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0034 52.90.002.0034
52.90.002.0035
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0035 52.90.002.0035
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0035 52.90.002.0035
52.90.002.0036
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0036 52.90.002.0036
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0036 52.90.002.0036
52.90.002.0037
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0037 52.90.002.0037
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0037 52.90.002.0037
52.90.002.0038
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0038 52.90.002.0038
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0038 52.90.002.0038
52.90.002.0039
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0039 52.90.002.0039
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0039 52.90.002.0039
52.90.002.0040
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0040 52.90.002.004
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0040 52.90.002.004
52.90.002.0041
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0041 52.90.002.0041
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0041 52.90.002.0041
52.90.002.0042
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0042 52.90.002.0042
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0042 52.90.002.0042
52.90.002.0043
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0043 52.90.002.0043
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0043 52.90.002.0043
52.90.002.0044
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0044 52.90.002.004
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0044 52.90.002.0044
52.90.002.0045
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0045 52.90.002.0045
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0045 52.90.002.0045
52.90.002.0046
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0046 52.90.002.0046
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0046 52.90.002.0046
52.90.002.0047
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0047 52.90.002.0047
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0047 52.90.002.0047
52.90.002.0048
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0048 52.90.002.004
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0048 52.90.002.0048
52.90.002.0049
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0049 52.90.002.0049
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0049 52.90.002.0049
52.90.002.0050
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0050 52.90.002.0050
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0050 52.90.002.0050
52.90.002.0051
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0051 52.90.002.0051
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0051 52.90.002.0051
52.90.002.0052
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0052 52.90.002.0052
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0052 52.90.002.0052
52.90.002.0053
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0053 52.90.002.005
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0053 52.90.002.0053
52.90.002.0054
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0054 52.90.002.0054
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0054 52.90.002.0054
52.90.002.0055
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0055 52.90.002.005
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0055 52.90.002.0055
52.90.002.0056
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0056 52.90.002.0056
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0056 52.90.002.0056
52.90.002.0057
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0057 52.90.002.0057
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0057 52.90.002.0057
52.90.002.0058
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0058 52.90.002.0058
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0058 52.90.002.0058
52.90.002.0059
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0059 52.90.002.0059
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0059 52.90.002.0059
52.90.002.0060
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0060 52.90.002.0060
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0060 52.90.002.0060
52.90.002.0061
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0061 52.90.002.0061
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0061 52.90.002.0061
52.90.002.0062
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0062 52.90.002.0062
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0062 52.90.002.0062
52.90.002.0063
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0063 52.90.002.0063
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0063 52.90.002.0063
52.90.002.0064
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0064 52.90.002.0064
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0064 52.90.002.0064
52.90.002.0065
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0065 52.90.002.0065
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0065 52.90.002.0065
52.90.002.0066
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0066 52.90.002.0066
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0066 52.90.002.0066
52.90.002.0067
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0067 52.90.002.0067
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0067 52.90.002.0067
52.90.002.0068
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0068 52.90.002.0068
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0068 52.90.002.0068
52.90.002.0069
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0069 52.90.002.0069
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0069 52.90.002.0069
52.90.002.0070
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0070 52.90.002.0070
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0070 52.90.002.0070
52.90.002.0071
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0071 52.90.002.0071
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0071 52.90.002.0071
52.90.002.0072
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0072 52.90.002.0072
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0072 52.90.002.0072
52.90.002.0073
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0073 52.90.002.0073
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0073 52.90.002.0073
52.90.002.0074
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0074 52.90.002.007
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0074 52.90.002.0074
52.90.002.0075
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0075 52.90.002.0075
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0075 52.90.002.0075
52.90.002.0076
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0076 52.90.002.0076
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0076 52.90.002.0076
52.90.002.0077
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0077 52.90.002.007
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0077 52.90.002.0077
52.90.002.0078
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0078 52.90.002.0078
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0078 52.90.002.0078
52.90.002.0079
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0079 52.90.002.0079
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0079 52.90.002.0079
52.90.002.0080
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0080 52.90.002.0080
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0080 52.90.002.0080
52.90.002.0081
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0081 52.90.002.0081
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0081 52.90.002.0081
52.90.002.0082
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0082 52.90.002.0082
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0082 52.90.002.0082
52.90.002.0083
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0083 52.90.002.0083
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0083 52.90.002.0083
52.90.002.0084
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0084 52.90.002.0084
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0084 52.90.002.0084
52.90.002.0085
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0085 52.90.002.0085
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0085 52.90.002.0085
52.90.002.0086
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0086 52.90.002.0086
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0086 52.90.002.0086
52.90.002.0087
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0087 52.90.002.0087
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0087 52.90.002.0087
52.90.002.0088
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0088 52.90.002.0088
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0088 52.90.002.0088
52.90.002.0089
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0089 52.90.002.0089
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0089 52.90.002.0089
52.90.002.0090
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0090 52.90.002.0090
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0090 52.90.002.0090
52.90.002.0091
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0091 52.90.002.0091
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0091 52.90.002.0091
52.90.002.0092
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0092 52.90.002.0092
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0092 52.90.002.0092
52.90.002.0093
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0093 52.90.002.0093
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0093 52.90.002.0093
52.90.002.0094
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0094 52.90.002.0094
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0094 52.90.002.0094
52.90.002.0095
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0095 52.90.002.0095
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0095 52.90.002.0095
52.90.002.0096
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0096 52.90.002.0096
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0096 52.90.002.0096
52.90.002.0097
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0097 52.90.002.0097
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0097 52.90.002.0097
52.90.002.0098
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0098 52.90.002.0098
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0098 52.90.002.0098
52.90.002.0099
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0099 52.90.002.0099
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0099 52.90.002.0099
52.90.002.0100
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0100 52.90.002.0100
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0100 52.90.002.0100
52.90.002.0101
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0101 52.90.002.0101
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0101 52.90.002.0101
52.90.002.0102
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0102 52.90.002.0102
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0102 52.90.002.0102
52.90.002.0103
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0103 52.90.002.0103
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0103 52.90.002.0103
52.90.002.0104
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0104 52.90.002.0104
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0104 52.90.002.0104
52.90.002.0105
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0105 52.90.002.0105
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0105 52.90.002.0105
52.90.002.0106
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0106 52.90.002.010
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0106 52.90.002.0106
52.90.002.0107
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0107 52.90.002.0107
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0107 52.90.002.0107
52.90.002.0108
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0108 52.90.002.0108
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0108 52.90.002.0108
52.90.002.0109
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0109 52.90.002.0109
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0109 52.90.002.0109
52.90.002.0110
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0110 52.90.002.0110
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0110 52.90.002.0110
52.90.002.0111
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0111 52.90.002.0111
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0111 52.90.002.0111
52.90.002.0112
INSTALACION DE TUBERMONTAJE TUBERIAS ENTERRA52.90.002.0112 52.90.002.0112
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.90.002.0112 52.90.002.0112

10.20.001.0003
PERNO SUMINISTRO Y COLOCACION 10.20.001.0003 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0003 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0003 10.20.001.000
10.20.001.0004
PERNO SUMINISTRO Y COLOCACION 10.20.001.0004 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0004 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0004 10.20.001.000
10.20.001.0103
PERNO SUMINISTRO Y COLOCACION 10.20.001.0103 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0103 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0103 10.20.001.010
10.20.001.0104
PERNO SUMINISTRO Y COLOCACION 10.20.001.0104 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0104 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0104 10.20.001.010
10.20.001.0008
PERNO SUMINISTRO Y COLOCACION 10.20.001.0008 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0008 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0008 10.20.001.000
10.20.001.0108
PERNO SUMINISTRO Y COLOCACION 10.20.001.0108 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0108 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0108 10.20.001.010
10.20.002.0001
PERNO SUMINISTRO Y COLOCACION 10.20.002.0001 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0001 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0001 10.20.002.000
10.20.002.0002
PERNO SUMINISTRO Y COLOCACION 10.20.002.0002 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0002 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0002 10.20.002.000
10.40.001.0012
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0012 10.40.001.001
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0012 10.40.001.001
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0012 10.40.001.001
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0012 10.40.001.001
10.40.001.0026
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0026 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0026 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0026 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0026 10.40.001.002
10.40.001.0040
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0040 10.40.001.004
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0040 10.40.001.004
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0040 10.40.001.004
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0040 10.40.001.004
10.40.002.2812
CONCRETO COLOCACION ACERO 10.40.002.2812 10.40.002.281
CONCRETO ENCOFRADO CONCRETO 10.40.002.2812 10.40.002.281
CONCRETO VACIADO CONCRETO 10.40.002.2812 10.40.002.281
CONCRETO DESCIMBRE CONCRETO 10.40.002.2812 10.40.002.281
CONCRETO LIMPIEZA CONCRETO 10.40.002.2812 10.40.002.281
CONCRETO PUNCH LIST CONCRETO 10.40.002.2812 10.40.002.281
10.40.002.2826
CONCRETO COLOCACION ACERO 10.40.002.2826 10.40.002.282
CONCRETO ENCOFRADO CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO VACIADO CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO DESCIMBRE CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO LIMPIEZA CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO PUNCH LIST CONCRETO 10.40.002.2826 10.40.002.282
10.40.002.2840
CONCRETO COLOCACION ACERO 10.40.002.2840 10.40.002.284
CONCRETO ENCOFRADO CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO VACIADO CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO DESCIMBRE CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO LIMPIEZA CONCRETO 10.40.002.2840 10.40.002.284
CONCRETO PUNCH LIST CONCRETO 10.40.002.2840 10.40.002.284
10.40.002.1564
CONCRETO COLOCACION ACERO 10.40.002.1564 10.40.002.156
CONCRETO ENCOFRADO CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO ENCOFRADO CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO VACIADO CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO DESCIMBRE CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO LIMPIEZA CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO PUNCH LIST CONCRETO 10.40.002.1564 10.40.002.156
10.60.002.1061
SOLADO ENCOFRADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO VACIADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO DESCIMBRE CONCRETO 10.60.002.1061 10.60.002.106
SOLADO LIMPIEZA CONCRETO 10.60.002.1061 10.60.002.106
SOLADO PUNCH LIST CONCRETO 10.60.002.1061 10.60.002.106

60.20.001.0006
CONDUIT SUMINISTRO CONDUIT 60.20.001.0006 60.20.001.000
CONDUIT MONTAJE CONDUIT 60.20.001.0006 60.20.001.000
CONDUIT PROTOCOLOS CONDUIT 60.20.001.0006 60.20.001.000
60.20.002.0002
CONDUIT SUMINISTRO CONDUIT 60.20.002.0002 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0002 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0002 60.20.002.000
60.20.002.0032
CONDUIT SUMINISTRO CONDUIT 60.20.002.0032 60.20.002.003
CONDUIT MONTAJE CONDUIT 60.20.002.0032 60.20.002.003
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0032 60.20.002.003
60.30.002.6312
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6312 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6312 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6312 60.30.002.631
60.30.002.6314
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6314 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6314 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6314 60.30.002.631
60.30.002.6315
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6315 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6315 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6315 60.30.002.631
60.30.002.6511
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6511 60.30.002.6511
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6511 60.30.002.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6511 60.30.002.651
60.30.002.7021
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7021 60.30.002.702
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7021 60.30.002.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7021 60.30.002.702
60.30.002.7022
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7022 60.30.002.702
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7022 60.30.002.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7022 60.30.002.702
60.30.002.8101
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8101 60.30.002.810
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8101 60.30.002.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8101 60.30.002.810
60.30.002.8102
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8102 60.30.002.810
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8102 60.30.002.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8102 60.30.002.810
60.30.002.9114
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.9114 60.30.002.9114
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.9114 60.30.002.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.9114 60.30.002.911
60.40.001.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0001 60.40.001.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0001 60.40.001.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0001 60.40.001.000
60.40.001.0002
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0002 60.40.001.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0002 60.40.001.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0002 60.40.001.000
60.40.002.0002
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0002 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0002 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0002 60.40.002.000
60.40.002.0003
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0003 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0003 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0003 60.40.002.000
60.40.004.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.004.0001 60.40.004.0001
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.004.0001 60.40.004.0001
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.004.0001 60.40.004.0001
60.50.001.6315
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6315 60.50.001.631
60.50.001.7021
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7021 60.50.001.702

70.20.001.0016
INDICADOR RECEPCION INDICADOR 70.20.001.0016 70.20.001.0016
INDICADOR MONTAJE INDICADOR 70.20.001.0016 70.20.001.0016
INDICADOR CONEXIONADO INDICADOR 70.20.001.0016 70.20.001.0016
INDICADOR CONTRASTACION INDICADOR 70.20.001.0016 70.20.001.0016
INDICADOR PROTOCOLOS INDICADOR 70.20.001.0016 70.20.001.0016

40.70.001.4701
PLANTA AGUA POTABLERECEPCION PLANTA OSMOSIS40.70.001.4701 40.70.001.4701
PLANTA AGUA POTABLEMONTAJE ESTRUCTURAS PLAN40.70.001.4701 40.70.001.4701
PLANTA AGUA POTABLEMONTAJE EQ MECANICOS PLA40.70.001.4701 40.70.001.4701
PLANTA AGUA POTABLECONEXIONADO PLANTA OSMO40.70.001.4701 40.70.001.4701
PLANTA AGUA POTABLEPROTOCOLOS PLANTA OSMOS40.70.001.4701 40.70.001.4701
40.70.001.4702
PLANTA OSMOSIS RECEPCION PLANTA OSMOSIS40.70.001.4702 40.70.001.4702
PLANTA OSMOSIS MONTAJE ESTRUCTURAS PLAN40.70.001.4702 40.70.001.4702
PLANTA OSMOSIS MONTAJE EQ MECANICOS PLA40.70.001.4702 40.70.001.4702
PLANTA OSMOSIS CONEXIONADO PLANTA OSMO40.70.001.4702 40.70.001.4702
PLANTA OSMOSIS PROTOCOLOS PLANTA OSMOS40.70.001.4702 40.70.001.4702

60.20.001.0006
CONDUIT SUMINISTRO CONDUIT 60.20.001.0006 60.20.001.000
CONDUIT MONTAJE CONDUIT 60.20.001.0006 60.20.001.000
CONDUIT PROTOCOLOS CONDUIT 60.20.001.0006 60.20.001.000
60.20.002.0002
CONDUIT SUMINISTRO CONDUIT 60.20.002.0002 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0002 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0002 60.20.002.000
60.20.002.0032
CONDUIT SUMINISTRO CONDUIT 60.20.002.0032 60.20.002.003
CONDUIT MONTAJE CONDUIT 60.20.002.0032 60.20.002.003
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0032 60.20.002.003
60.30.002.6312
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6312 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6312 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6312 60.30.002.631
60.30.002.6314
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6314 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6314 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6314 60.30.002.631
60.30.002.6315
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6315 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6315 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6315 60.30.002.631
60.30.002.6511
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6511 60.30.002.6511
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6511 60.30.002.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6511 60.30.002.651
60.30.002.7021
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7021 60.30.002.702
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7021 60.30.002.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7021 60.30.002.702
60.30.002.7022
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7022 60.30.002.702
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7022 60.30.002.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7022 60.30.002.702
60.30.002.8101
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8101 60.30.002.810
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8101 60.30.002.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8101 60.30.002.810
60.30.002.8102
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8102 60.30.002.810
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8102 60.30.002.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8102 60.30.002.810
60.30.002.9114
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.9114 60.30.002.9114
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.9114 60.30.002.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.9114 60.30.002.911
60.40.001.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0001 60.40.001.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0001 60.40.001.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0001 60.40.001.000
60.40.001.0002
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0002 60.40.001.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0002 60.40.001.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0002 60.40.001.000
60.40.002.0002
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0002 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0002 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0002 60.40.002.000
60.40.002.0003
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0003 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0003 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0003 60.40.002.000
60.40.004.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.004.0001 60.40.004.0001
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.004.0001 60.40.004.0001
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.004.0001 60.40.004.0001
60.50.001.6315
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6315 60.50.001.631
60.50.001.7021
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7021 60.50.001.702

70.20.001.0029
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0029 70.20.001.0029
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0029 70.20.001.0029
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0029 70.20.001.0029
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0029 70.20.001.0029
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0029 70.20.001.0029
70.40.002.0005
RACK REMOTO RECEPCION INSTRUMENTOS 70.40.002.0005 70.40.002.0005
RACK REMOTO MONTAJE INSTRUMENTOS 70.40.002.0005 70.40.002.0005
RACK REMOTO CONEXIONADO INSTRUMENTO70.40.002.0005 70.40.002.0005
RACK REMOTO CONTRASTACION INSTRUMEN70.40.002.0005 70.40.002.0005
RACK REMOTO PROTOCOLOS INSTRUMENTOS70.40.002.0005 70.40.002.0005

40.70.001.4601
PLANTA TRATAMIENTORECEPCION PTAS 40.70.001.4601 40.70.001.4601
PLANTA TRATAMIENTOMONTAJE ESTRUCTURAS PTAS40.70.001.4601 40.70.001.4601
PLANTA TRATAMIENTOMONTAJE EQUIPOS PTAS 40.70.001.4601 40.70.001.4601
PLANTA TRATAMIENTOCONEXIONADO PTAS 40.70.001.4601 40.70.001.4601
PLANTA TRATAMIENTOPROTOCOLOS PTAS 40.70.001.4601 40.70.001.4601

60.20.001.0003
CONDUIT SUMINISTRO CONDUIT 60.20.001.0003 60.20.001.000
CONDUIT MONTAJE CONDUIT 60.20.001.0003 60.20.001.000
CONDUIT PROTOCOLOS CONDUIT 60.20.001.0003 60.20.001.000
60.20.001.0005
CONDUIT SUMINISTRO CONDUIT 60.20.001.0005 60.20.001.000
CONDUIT MONTAJE CONDUIT 60.20.001.0005 60.20.001.000
CONDUIT PROTOCOLOS CONDUIT 60.20.001.0005 60.20.001.000
60.20.002.0002
CONDUIT SUMINISTRO CONDUIT 60.20.002.0002 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0002 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0002 60.20.002.000
60.20.002.0003
CONDUIT SUMINISTRO CONDUIT 60.20.002.0003 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0003 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0003 60.20.002.000
60.20.002.0004
CONDUIT SUMINISTRO CONDUIT 60.20.002.0004 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0004 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0004 60.20.002.000
60.20.002.0005
CONDUIT SUMINISTRO CONDUIT 60.20.002.0005 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0005 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0005 60.20.002.000
60.20.002.0006
CONDUIT SUMINISTRO CONDUIT 60.20.002.0006 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0006 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0006 60.20.002.000
60.20.002.0032
CONDUIT SUMINISTRO CONDUIT 60.20.002.0032 60.20.002.0032
CONDUIT MONTAJE CONDUIT 60.20.002.0032 60.20.002.003
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0032 60.20.002.0032
60.20.002.0043
CONDUIT SUMINISTRO CONDUIT 60.20.002.0043 60.20.002.004
CONDUIT MONTAJE CONDUIT 60.20.002.0043 60.20.002.004
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0043 60.20.002.004
60.20.002.0057
CONDUIT SUMINISTRO CONDUIT 60.20.002.0057 60.20.002.0057
CONDUIT MONTAJE CONDUIT 60.20.002.0057 60.20.002.005
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0057 60.20.002.005
60.20.002.0058
CONDUIT SUMINISTRO CONDUIT 60.20.002.0058 60.20.002.005
CONDUIT MONTAJE CONDUIT 60.20.002.0058 60.20.002.005
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0058 60.20.002.005
60.30.001.1307
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.1307 60.30.001.1307
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.1307 60.30.001.130
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.1307 60.30.001.130
60.30.001.3103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.3103 60.30.001.310
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.3103 60.30.001.310
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.3103 60.30.001.310
60.30.001.3310
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.3310 60.30.001.331
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.3310 60.30.001.331
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.3310 60.30.001.331
60.30.001.6103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6103 60.30.001.610
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6103 60.30.001.610
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6103 60.30.001.6103
60.30.001.6308
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6308 60.30.001.630
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6308 60.30.001.630
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6308 60.30.001.630
60.30.001.6313
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6313 60.30.001.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6313 60.30.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6313 60.30.001.631
60.30.001.6314
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6314 60.30.001.6314
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6314 60.30.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6314 60.30.001.6314
60.30.001.6409
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6409 60.30.001.640
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6409 60.30.001.640
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6409 60.30.001.640
60.30.001.6410
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6410 60.30.001.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6410 60.30.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6410 60.30.001.641
60.30.001.6411
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6411 60.30.001.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6411 60.30.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6411 60.30.001.641
60.30.001.6412
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6412 60.30.001.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6412 60.30.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6412 60.30.001.641
60.30.001.6511
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6511 60.30.001.651
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6511 60.30.001.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6511 60.30.001.651
60.30.001.7012
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.7012 60.30.001.7012
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.7012 60.30.001.701
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.7012 60.30.001.7012
60.30.001.8011
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.8011 60.30.001.8011
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.8011 60.30.001.801
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.8011 60.30.001.8011
60.30.001.8012
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.8012 60.30.001.8012
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.8012 60.30.001.801
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.8012 60.30.001.8012
60.30.001.9113
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.9113 60.30.001.911
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.9113 60.30.001.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.9113 60.30.001.911
60.30.001.9114
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.9114 60.30.001.911
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.9114 60.30.001.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.9114 60.30.001.911
60.30.002.1307
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.1307 60.30.002.130
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.1307 60.30.002.130
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.1307 60.30.002.130
60.30.002.3103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.3103 60.30.002.310
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.3103 60.30.002.310
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.3103 60.30.002.310
60.30.002.3105
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.3105 60.30.002.310
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.3105 60.30.002.310
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.3105 60.30.002.310
60.30.002.3310
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.3310 60.30.002.331
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.3310 60.30.002.331
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.3310 60.30.002.331
60.30.002.6103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6103 60.30.002.610
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6103 60.30.002.610
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6103 60.30.002.610
60.30.002.6308
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6308 60.30.002.6308
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6308 60.30.002.630
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6308 60.30.002.630
60.30.002.6312
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6312 60.30.002.6312
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6312 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6312 60.30.002.6312
60.30.002.6313
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6313 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6313 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6313 60.30.002.631
60.30.002.6314
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6314 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6314 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6314 60.30.002.631
60.30.002.6315
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6315 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6315 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6315 60.30.002.631
60.30.002.6409
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6409 60.30.002.640
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6409 60.30.002.640
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6409 60.30.002.640
60.30.002.6410
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6410 60.30.002.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6410 60.30.002.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6410 60.30.002.641
60.30.002.6411
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6411 60.30.002.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6411 60.30.002.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6411 60.30.002.641
60.30.002.6412
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6412 60.30.002.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6412 60.30.002.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6412 60.30.002.641
60.30.002.6413
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6413 60.30.002.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6413 60.30.002.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6413 60.30.002.641
60.30.002.6508
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6508 60.30.002.650
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6508 60.30.002.650
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6508 60.30.002.6508
60.30.002.6511
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6511 60.30.002.651
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6511 60.30.002.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6511 60.30.002.651
60.30.002.7012
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7012 60.30.002.701
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7012 60.30.002.701
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7012 60.30.002.701
60.30.002.7021
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7021 60.30.002.702
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7021 60.30.002.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7021 60.30.002.702
60.30.002.7022
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7022 60.30.002.702
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7022 60.30.002.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7022 60.30.002.702
60.30.002.7334
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7334 60.30.002.733
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7334 60.30.002.733
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7334 60.30.002.733
60.30.002.7338
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7338 60.30.002.733
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7338 60.30.002.733
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7338 60.30.002.733
60.30.002.8101
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8101 60.30.002.8101
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8101 60.30.002.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8101 60.30.002.810
60.30.002.8102
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8102 60.30.002.8102
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8102 60.30.002.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8102 60.30.002.810
60.30.002.8300
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8300 60.30.002.8300
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8300 60.30.002.830
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8300 60.30.002.8300
60.30.002.9114
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.9114 60.30.002.911
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.9114 60.30.002.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.9114 60.30.002.911
60.40.001.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0001 60.40.001.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0001 60.40.001.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0001 60.40.001.000
60.40.001.0002
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0002 60.40.001.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0002 60.40.001.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0002 60.40.001.000
60.40.002.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0001 60.40.002.0001
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0001 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0001 60.40.002.000
60.40.002.0002
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0002 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0002 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0002 60.40.002.000
60.40.002.0003
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0003 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0003 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0003 60.40.002.000
60.40.004.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.004.0001 60.40.004.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.004.0001 60.40.004.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.004.0001 60.40.004.000
60.40.005.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.005.0001 60.40.005.0001
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.005.0001 60.40.005.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.005.0001 60.40.005.000
60.40.006.0004
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.006.0004 60.40.006.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.006.0004 60.40.006.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.006.0004 60.40.006.000
60.50.001.1407
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.1407 60.50.001.140
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.1407 60.50.001.140
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.1407 60.50.001.140
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.1407 60.50.001.140
60.50.001.1427
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.1427 60.50.001.142
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.1427 60.50.001.142
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.1427 60.50.001.142
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.1427 60.50.001.142
60.50.001.3103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.3103 60.50.001.310
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.3103 60.50.001.310
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.3103 60.50.001.310
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.3103 60.50.001.310
60.50.001.3105
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.3105 60.50.001.310
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.3105 60.50.001.310
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.3105 60.50.001.310
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.3105 60.50.001.310
60.50.001.3410
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.3410 60.50.001.341
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.3410 60.50.001.341
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.3410 60.50.001.341
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.3410 60.50.001.341
60.50.001.6103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6103 60.50.001.610
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6103 60.50.001.610
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6103 60.50.001.610
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6103 60.50.001.610
60.50.001.6308
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6308 60.50.001.630
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6308 60.50.001.6308
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6308 60.50.001.630
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6308 60.50.001.630
60.50.001.6313
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6313 60.50.001.631
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6313 60.50.001.631
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6313 60.50.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6313 60.50.001.631
60.50.001.6314
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6314 60.50.001.631
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6314 60.50.001.6314
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6314 60.50.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6314 60.50.001.631
60.50.001.6315
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6315 60.50.001.631
60.50.001.6409
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6409 60.50.001.640
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6409 60.50.001.640
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6409 60.50.001.640
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6409 60.50.001.640
60.50.001.6410
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6410 60.50.001.641
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6410 60.50.001.641
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6410 60.50.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6410 60.50.001.641
60.50.001.6411
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6411 60.50.001.641
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6411 60.50.001.641
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6411 60.50.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6411 60.50.001.641
60.50.001.6412
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6412 60.50.001.641
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6412 60.50.001.641
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6412 60.50.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6412 60.50.001.641
60.50.001.6413
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6413 60.50.001.641
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6413 60.50.001.641
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6413 60.50.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6413 60.50.001.641
60.50.001.6508
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6508 60.50.001.650
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6508 60.50.001.650
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6508 60.50.001.650
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6508 60.50.001.650
60.50.001.6511
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6511 60.50.001.651
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6511 60.50.001.651
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6511 60.50.001.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6511 60.50.001.651
60.50.001.7012
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7012 60.50.001.701
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7012 60.50.001.701
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7012 60.50.001.701
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7012 60.50.001.701
60.50.001.7021
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7021 60.50.001.7021
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7021 60.50.001.702
60.50.001.7334
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7334 60.50.001.733
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7334 60.50.001.7334
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7334 60.50.001.733
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7334 60.50.001.733
60.50.001.7338
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7338 60.50.001.733
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7338 60.50.001.7338
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7338 60.50.001.733
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7338 60.50.001.733
60.50.001.9113
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.9113 60.50.001.911
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.9113 60.50.001.911
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.9113 60.50.001.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.9113 60.50.001.911
60.60.002.0002
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.60.002.0002 60.60.002.000
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.60.002.0002 60.60.002.000
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.60.002.0002 60.60.002.000
60.60.002.0004
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.60.002.0004 60.60.002.000
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.60.002.0004 60.60.002.000
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.60.002.0004 60.60.002.000
60.60.002.0005
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.60.002.0005 60.60.002.000
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.60.002.0005 60.60.002.000
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.60.002.0005 60.60.002.000
60.60.005.0062
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.60.005.0062 60.60.005.006
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.60.005.0062 60.60.005.006
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.60.005.0062 60.60.005.006
60.60.005.0073
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.60.005.0073 60.60.005.007
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.60.005.0073 60.60.005.007
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.60.005.0073 60.60.005.007
60.70.001.0006
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.001.0006 60.70.001.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.001.0006 60.70.001.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.001.0006 60.70.001.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.001.0006 60.70.001.000
60.70.001.0008
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.001.0008 60.70.001.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.001.0008 60.70.001.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.001.0008 60.70.001.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.001.0008 60.70.001.000
60.70.004.0001
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.004.0001 60.70.004.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.004.0001 60.70.004.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.004.0001 60.70.004.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.004.0001 60.70.004.000
60.70.004.0002
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.004.0002 60.70.004.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.004.0002 60.70.004.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.004.0002 60.70.004.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.004.0002 60.70.004.000
60.70.004.0003
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.004.0003 60.70.004.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.004.0003 60.70.004.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.004.0003 60.70.004.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.004.0003 60.70.004.000
60.70.004.0004
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.004.0004 60.70.004.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.004.0004 60.70.004.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.004.0004 60.70.004.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.004.0004 60.70.004.000
60.70.005.0003
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.005.0003 60.70.005.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.005.0003 60.70.005.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.005.0003 60.70.005.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.005.0003 60.70.005.000
60.70.005.0006
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.005.0006 60.70.005.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.005.0006 60.70.005.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.005.0006 60.70.005.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.005.0006 60.70.005.000
60.70.006.0001
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.006.0001 60.70.006.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.006.0001 60.70.006.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.006.0001 60.70.006.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.006.0001 60.70.006.000
60.70.006.0002
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.006.0002 60.70.006.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.006.0002 60.70.006.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.006.0002 60.70.006.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.006.0002 60.70.006.000
60.70.006.0005
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.006.0005 60.70.006.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.006.0005 60.70.006.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.006.0005 60.70.006.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.006.0005 60.70.006.000
60.70.008.0101
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.008.0101 60.70.008.010
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.008.0101 60.70.008.010
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.008.0101 60.70.008.010
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.008.0101 60.70.008.010
60.70.009.0002
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.009.0002 60.70.009.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.009.0002 60.70.009.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.009.0002 60.70.009.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.009.0002 60.70.009.000
60.70.020.0000
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.020.0000 60.70.020.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.020.0000 60.70.020.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.020.0000 60.70.020.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.020.0000 60.70.020.000

00.25.001.0001
EXCAVACION EXCAVACION PARA PUESTA A T00.25.001.0001 00.25.001.000
00.25.001.0002
EXCAVACION EXCAVACION PARA CONDUIT 00.25.001.0002 00.25.001.000
00.25.003.0001
EXCAVACION EXCAVACION PARA BANCODUC00.25.003.0001 00.25.003.000
00.25.003.0002
EXCAVACION EXCAVACION PARA MANHOLES00.25.003.0002 00.25.003.000
00.30.002.0001
RELLENO RELLENO PARA PUESTA A TIER 00.30.002.0001 00.30.002.000
00.30.002.0002
RELLENO RELLENO PARA CONDUIT 00.30.002.0002 00.30.002.000
00.30.003.0004
RELLENO RELLENO PARA BANCODUCTOS00.30.003.0004 00.30.003.000
00.30.003.0005
RELLENO RELLENO PARA MANHOLES 00.30.003.0005 00.30.003.000

10.20.001.0001
PERNO SUMINISTRO Y COLOCACION 10.20.001.0001 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0001 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0001 10.20.001.000
10.20.001.0002
PERNO SUMINISTRO Y COLOCACION 10.20.001.0002 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0002 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0002 10.20.001.000
10.20.001.0101
PERNO SUMINISTRO Y COLOCACION 10.20.001.0101 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0101 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0101 10.20.001.010
10.20.001.0102
PERNO SUMINISTRO Y COLOCACION 10.20.001.0102 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0102 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0102 10.20.001.010
10.20.001.0003
PERNO SUMINISTRO Y COLOCACION 10.20.001.0003 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0003 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0003 10.20.001.000
10.20.001.0004
PERNO SUMINISTRO Y COLOCACION 10.20.001.0004 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0004 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0004 10.20.001.000
10.20.001.0103
PERNO SUMINISTRO Y COLOCACION 10.20.001.0103 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0103 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0103 10.20.001.010
10.20.001.0104
PERNO SUMINISTRO Y COLOCACION 10.20.001.0104 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0104 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0104 10.20.001.010
10.20.002.0001
PERNO SUMINISTRO Y COLOCACION 10.20.002.0001 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0001 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0001 10.20.002.000
10.20.002.0002
PERNO SUMINISTRO Y COLOCACION 10.20.002.0002 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0002 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0002 10.20.002.000
10.40.001.0001
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0001 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0001 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0001 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0001 10.40.001.000
10.40.001.0002
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0002 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0002 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0002 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0002 10.40.001.000
10.40.001.0005
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0005 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0005 10.40.001.000
10.40.001.0006
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0006 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0006 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0006 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0006 10.40.001.000
10.40.001.0009
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0009 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0009 10.40.001.000
10.40.001.0026
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0026 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0026 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0026 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0026 10.40.001.002
10.40.001.0064
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0064 10.40.001.006
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0064 10.40.001.006
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0064 10.40.001.006
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0064 10.40.001.006
10.40.001.0069
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0069 10.40.001.006
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0069 10.40.001.006
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0069 10.40.001.006
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0069 10.40.001.006
10.40.002.2169
CONCRETO COLOCACION ACERO 10.40.002.2169 10.40.002.216
CONCRETO ENCOFRADO CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO VACIADO CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO DESCIMBRE CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO LIMPIEZA CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO PUNCH LIST CONCRETO 10.40.002.2169 10.40.002.216
10.40.002.2801
CONCRETO COLOCACION ACERO 10.40.002.2801 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2801 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2801 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2801 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2801 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2801 10.40.002.280
10.40.002.2802
CONCRETO COLOCACION ACERO 10.40.002.2802 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2802 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2802 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2802 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2802 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2802 10.40.002.280
10.40.002.2805
CONCRETO COLOCACION ACERO 10.40.002.2805 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2805 10.40.002.280
10.40.002.2806
CONCRETO COLOCACION ACERO 10.40.002.2806 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2806 10.40.002.280
10.40.002.2809
CONCRETO COLOCACION ACERO 10.40.002.2809 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2809 10.40.002.280
10.40.002.2826
CONCRETO COLOCACION ACERO 10.40.002.2826 10.40.002.2826
CONCRETO ENCOFRADO CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2826 10.40.002.2826
CONCRETO VACIADO CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO DESCIMBRE CONCRETO 10.40.002.2826 10.40.002.2826
CONCRETO LIMPIEZA CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO PUNCH LIST CONCRETO 10.40.002.2826 10.40.002.2826
10.40.002.1564
CONCRETO COLOCACION ACERO 10.40.002.1564 10.40.002.156
CONCRETO ENCOFRADO CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO VACIADO CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO DESCIMBRE CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO LIMPIEZA CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO PUNCH LIST CONCRETO 10.40.002.1564 10.40.002.156
10.60.002.1061
SOLADO ENCOFRADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO VACIADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO DESCIMBRE CONCRETO 10.60.002.1061 10.60.002.106
SOLADO LIMPIEZA CONCRETO 10.60.002.1061 10.60.002.106
SOLADO PUNCH LIST CONCRETO 10.60.002.1061 10.60.002.106

60.20.001.0003
CONDUIT SUMINISTRO CONDUIT 60.20.001.0003 60.20.001.000
CONDUIT MONTAJE CONDUIT 60.20.001.0003 60.20.001.000
CONDUIT PROTOCOLOS CONDUIT 60.20.001.0003 60.20.001.000
60.20.001.0005
CONDUIT SUMINISTRO CONDUIT 60.20.001.0005 60.20.001.000
CONDUIT MONTAJE CONDUIT 60.20.001.0005 60.20.001.000
CONDUIT PROTOCOLOS CONDUIT 60.20.001.0005 60.20.001.000
60.20.002.0002
CONDUIT SUMINISTRO CONDUIT 60.20.002.0002 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0002 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0002 60.20.002.000
60.20.002.0003
CONDUIT SUMINISTRO CONDUIT 60.20.002.0003 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0003 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0003 60.20.002.000
60.20.002.0004
CONDUIT SUMINISTRO CONDUIT 60.20.002.0004 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0004 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0004 60.20.002.000
60.20.002.0005
CONDUIT SUMINISTRO CONDUIT 60.20.002.0005 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0005 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0005 60.20.002.000
60.20.002.0006
CONDUIT SUMINISTRO CONDUIT 60.20.002.0006 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0006 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0006 60.20.002.000
60.20.002.0032
CONDUIT SUMINISTRO CONDUIT 60.20.002.0032 60.20.002.0032
CONDUIT MONTAJE CONDUIT 60.20.002.0032 60.20.002.003
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0032 60.20.002.003
60.20.002.0043
CONDUIT SUMINISTRO CONDUIT 60.20.002.0043 60.20.002.004
CONDUIT MONTAJE CONDUIT 60.20.002.0043 60.20.002.004
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0043 60.20.002.004
60.20.002.0057
CONDUIT SUMINISTRO CONDUIT 60.20.002.0057 60.20.002.005
CONDUIT MONTAJE CONDUIT 60.20.002.0057 60.20.002.005
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0057 60.20.002.005
60.20.002.0058
CONDUIT SUMINISTRO CONDUIT 60.20.002.0058 60.20.002.005
CONDUIT MONTAJE CONDUIT 60.20.002.0058 60.20.002.005
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0058 60.20.002.005
60.30.001.1307
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.1307 60.30.001.1307
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.1307 60.30.001.130
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.1307 60.30.001.130
60.30.001.3103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.3103 60.30.001.310
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.3103 60.30.001.310
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.3103 60.30.001.310
60.30.001.3310
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.3310 60.30.001.331
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.3310 60.30.001.331
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.3310 60.30.001.331
60.30.001.6103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6103 60.30.001.610
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6103 60.30.001.610
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6103 60.30.001.6103
60.30.001.6308
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6308 60.30.001.630
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6308 60.30.001.630
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6308 60.30.001.630
60.30.001.6313
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6313 60.30.001.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6313 60.30.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6313 60.30.001.631
60.30.001.6314
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6314 60.30.001.6314
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6314 60.30.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6314 60.30.001.631
60.30.001.6409
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6409 60.30.001.640
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6409 60.30.001.640
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6409 60.30.001.640
60.30.001.6410
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6410 60.30.001.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6410 60.30.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6410 60.30.001.641
60.30.001.6411
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6411 60.30.001.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6411 60.30.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6411 60.30.001.641
60.30.001.6412
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6412 60.30.001.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6412 60.30.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6412 60.30.001.641
60.30.001.6511
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6511 60.30.001.651
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6511 60.30.001.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6511 60.30.001.651
60.30.001.7012
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.7012 60.30.001.7012
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.7012 60.30.001.701
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.7012 60.30.001.701
60.30.001.8011
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.8011 60.30.001.8011
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.8011 60.30.001.801
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.8011 60.30.001.8011
60.30.001.8012
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.8012 60.30.001.8012
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.8012 60.30.001.801
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.8012 60.30.001.8012
60.30.001.9113
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.9113 60.30.001.911
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.9113 60.30.001.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.9113 60.30.001.911
60.30.001.9114
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.9114 60.30.001.911
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.9114 60.30.001.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.9114 60.30.001.911
60.30.002.1307
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.1307 60.30.002.130
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.1307 60.30.002.130
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.1307 60.30.002.130
60.30.002.3103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.3103 60.30.002.310
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.3103 60.30.002.310
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.3103 60.30.002.310
60.30.002.3105
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.3105 60.30.002.310
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.3105 60.30.002.310
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.3105 60.30.002.310
60.30.002.3310
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.3310 60.30.002.331
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.3310 60.30.002.331
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.3310 60.30.002.331
60.30.002.6103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6103 60.30.002.610
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6103 60.30.002.610
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6103 60.30.002.610
60.30.002.6308
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6308 60.30.002.630
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6308 60.30.002.630
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6308 60.30.002.630
60.30.002.6312
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6312 60.30.002.6312
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6312 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6312 60.30.002.631
60.30.002.6313
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6313 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6313 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6313 60.30.002.631
60.30.002.6314
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6314 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6314 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6314 60.30.002.631
60.30.002.6315
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6315 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6315 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6315 60.30.002.631
60.30.002.6409
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6409 60.30.002.640
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6409 60.30.002.640
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6409 60.30.002.640
60.30.002.6410
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6410 60.30.002.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6410 60.30.002.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6410 60.30.002.641
60.30.002.6411
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6411 60.30.002.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6411 60.30.002.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6411 60.30.002.641
60.30.002.6412
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6412 60.30.002.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6412 60.30.002.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6412 60.30.002.641
60.30.002.6413
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6413 60.30.002.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6413 60.30.002.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6413 60.30.002.641
60.30.002.6508
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6508 60.30.002.650
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6508 60.30.002.650
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6508 60.30.002.6508
60.30.002.6511
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6511 60.30.002.651
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6511 60.30.002.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6511 60.30.002.651
60.30.002.7012
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7012 60.30.002.701
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7012 60.30.002.701
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7012 60.30.002.701
60.30.002.7021
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7021 60.30.002.702
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7021 60.30.002.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7021 60.30.002.702
60.30.002.7022
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7022 60.30.002.702
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7022 60.30.002.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7022 60.30.002.702
60.30.002.7334
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7334 60.30.002.733
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7334 60.30.002.733
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7334 60.30.002.733
60.30.002.7338
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7338 60.30.002.733
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7338 60.30.002.733
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7338 60.30.002.733
60.30.002.8101
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8101 60.30.002.810
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8101 60.30.002.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8101 60.30.002.810
60.30.002.8102
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8102 60.30.002.8102
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8102 60.30.002.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8102 60.30.002.810
60.30.002.8300
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8300 60.30.002.8300
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8300 60.30.002.830
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8300 60.30.002.830
60.30.002.9114
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.9114 60.30.002.911
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.9114 60.30.002.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.9114 60.30.002.911
60.40.001.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0001 60.40.001.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0001 60.40.001.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0001 60.40.001.000
60.40.001.0002
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0002 60.40.001.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0002 60.40.001.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0002 60.40.001.000
60.40.002.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0001 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0001 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0001 60.40.002.000
60.40.002.0002
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0002 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0002 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0002 60.40.002.000
60.40.002.0003
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0003 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0003 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0003 60.40.002.000
60.40.004.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.004.0001 60.40.004.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.004.0001 60.40.004.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.004.0001 60.40.004.000
60.40.005.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.005.0001 60.40.005.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.005.0001 60.40.005.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.005.0001 60.40.005.000
60.40.006.0004
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.006.0004 60.40.006.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.006.0004 60.40.006.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.006.0004 60.40.006.000
60.50.001.1407
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.1407 60.50.001.140
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.1407 60.50.001.140
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.1407 60.50.001.140
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.1407 60.50.001.140
60.50.001.1427
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.1427 60.50.001.142
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.1427 60.50.001.142
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.1427 60.50.001.142
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.1427 60.50.001.142
60.50.001.3103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.3103 60.50.001.310
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.3103 60.50.001.310
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.3103 60.50.001.310
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.3103 60.50.001.310
60.50.001.3105
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.3105 60.50.001.310
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.3105 60.50.001.310
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.3105 60.50.001.310
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.3105 60.50.001.310
60.50.001.3410
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.3410 60.50.001.341
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.3410 60.50.001.341
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.3410 60.50.001.341
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.3410 60.50.001.341
60.50.001.6103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6103 60.50.001.610
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6103 60.50.001.610
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6103 60.50.001.610
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6103 60.50.001.610
60.50.001.6308
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6308 60.50.001.630
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6308 60.50.001.6308
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6308 60.50.001.630
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6308 60.50.001.630
60.50.001.6313
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6313 60.50.001.631
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6313 60.50.001.631
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6313 60.50.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6313 60.50.001.631
60.50.001.6314
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6314 60.50.001.631
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6314 60.50.001.6314
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6314 60.50.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6314 60.50.001.631
60.50.001.6315
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6315 60.50.001.631
60.50.001.6409
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6409 60.50.001.640
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6409 60.50.001.640
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6409 60.50.001.640
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6409 60.50.001.640
60.50.001.6410
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6410 60.50.001.641
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6410 60.50.001.641
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6410 60.50.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6410 60.50.001.641
60.50.001.6411
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6411 60.50.001.641
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6411 60.50.001.641
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6411 60.50.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6411 60.50.001.641
60.50.001.6412
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6412 60.50.001.641
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6412 60.50.001.641
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6412 60.50.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6412 60.50.001.641
60.50.001.6413
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6413 60.50.001.641
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6413 60.50.001.641
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6413 60.50.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6413 60.50.001.641
60.50.001.6508
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6508 60.50.001.650
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6508 60.50.001.650
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6508 60.50.001.650
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6508 60.50.001.650
60.50.001.6511
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6511 60.50.001.651
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6511 60.50.001.651
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6511 60.50.001.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6511 60.50.001.651
60.50.001.7012
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7012 60.50.001.701
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7012 60.50.001.701
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7012 60.50.001.701
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7012 60.50.001.701
60.50.001.7021
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7021 60.50.001.702
60.50.001.7334
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7334 60.50.001.733
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7334 60.50.001.7334
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7334 60.50.001.733
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7334 60.50.001.733
60.50.001.7338
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7338 60.50.001.733
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7338 60.50.001.7338
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7338 60.50.001.733
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7338 60.50.001.733
60.50.001.9113
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.9113 60.50.001.911
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.9113 60.50.001.911
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.9113 60.50.001.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.9113 60.50.001.911
60.60.002.0002
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.60.002.0002 60.60.002.000
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.60.002.0002 60.60.002.000
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.60.002.0002 60.60.002.000
60.60.002.0004
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.60.002.0004 60.60.002.000
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.60.002.0004 60.60.002.000
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.60.002.0004 60.60.002.000
60.60.002.0005
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.60.002.0005 60.60.002.000
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.60.002.0005 60.60.002.000
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.60.002.0005 60.60.002.000
60.60.005.0062
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.60.005.0062 60.60.005.006
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.60.005.0062 60.60.005.006
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.60.005.0062 60.60.005.006
60.60.005.0073
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.60.005.0073 60.60.005.007
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.60.005.0073 60.60.005.007
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.60.005.0073 60.60.005.007
60.70.001.0006
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.001.0006 60.70.001.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.001.0006 60.70.001.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.001.0006 60.70.001.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.001.0006 60.70.001.000
60.70.001.0008
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.001.0008 60.70.001.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.001.0008 60.70.001.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.001.0008 60.70.001.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.001.0008 60.70.001.000
60.70.004.0001
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.004.0001 60.70.004.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.004.0001 60.70.004.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.004.0001 60.70.004.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.004.0001 60.70.004.000
60.70.004.0002
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.004.0002 60.70.004.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.004.0002 60.70.004.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.004.0002 60.70.004.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.004.0002 60.70.004.000
60.70.004.0003
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.004.0003 60.70.004.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.004.0003 60.70.004.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.004.0003 60.70.004.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.004.0003 60.70.004.000
60.70.004.0004
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.004.0004 60.70.004.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.004.0004 60.70.004.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.004.0004 60.70.004.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.004.0004 60.70.004.000
60.70.005.0003
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.005.0003 60.70.005.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.005.0003 60.70.005.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.005.0003 60.70.005.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.005.0003 60.70.005.000
60.70.005.0006
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.005.0006 60.70.005.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.005.0006 60.70.005.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.005.0006 60.70.005.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.005.0006 60.70.005.000
60.70.006.0001
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.006.0001 60.70.006.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.006.0001 60.70.006.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.006.0001 60.70.006.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.006.0001 60.70.006.000
60.70.006.0002
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.006.0002 60.70.006.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.006.0002 60.70.006.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.006.0002 60.70.006.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.006.0002 60.70.006.000
60.70.006.0005
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.006.0005 60.70.006.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.006.0005 60.70.006.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.006.0005 60.70.006.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.006.0005 60.70.006.000
60.70.008.0101
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.008.0101 60.70.008.010
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.008.0101 60.70.008.010
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.008.0101 60.70.008.010
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.008.0101 60.70.008.010
60.70.009.0002
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.009.0002 60.70.009.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.009.0002 60.70.009.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.009.0002 60.70.009.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.009.0002 60.70.009.000
60.70.020.0000
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.020.0000 60.70.020.000
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.020.0000 60.70.020.000
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.020.0000 60.70.020.000
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.020.0000 60.70.020.000

70.20.001.0009
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0009 70.20.001.0009
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0009 70.20.001.0009
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0009 70.20.001.0009
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0009 70.20.001.0009
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0009 70.20.001.0009
70.20.001.00X4
ACTUADOR RECEPCION ACTUADOR 70.20.001.00X4 70.20.001.00X4
ACTUADOR MONTAJE ACTUADOR 70.20.001.00X4 70.20.001.00X4
ACTUADOR CONEXIONADO ACTUADOR 70.20.001.00X4 70.20.001.00X4
ACTUADOR CONTRASTACION ACTUADOR 70.20.001.00X4 70.20.001.00X4
ACTUADOR PROTOCOLO ACTUADOR 70.20.001.00X4 70.20.001.00X4
70.20.006.0002
TABLERO RECEPCION TABLERO 70.20.006.0002 70.20.006.0002
TABLERO MONTAJE INTERRUPTOR TABL70.20.006.0002 70.20.006.0002
TABLERO CONEXIONADO TABLERO 70.20.006.0002 70.20.006.0002
TABLERO CONTRASTACION TABLERO 70.20.006.0002 70.20.006.0002
TABLERO PROTOCOLOS TABLERO 70.20.006.0002 70.20.006.0002
70.40.002.0005
RACK REMOTO RECEPCION INSTRUMENTOS 70.40.002.0005 70.40.002.0005
RACK REMOTO MONTAJE INSTRUMENTOS 70.40.002.0005 70.40.002.0005
RACK REMOTO CONEXIONADO INSTRUMENTO70.40.002.0005 70.40.002.0005
RACK REMOTO CONTRASTACION INSTRUMEN70.40.002.0005 70.40.002.0005
RACK REMOTO PROTOCOLOS INSTRUMENTOS70.40.002.0005 70.40.002.0005

00.20.003.0001
EXCAVACION EXCAVACION DE ESCARPE 00.20.003.0001 00.20.003.000
00.30.004.0002
RELLENO RELLENO MASIVO CLASE B 00.30.004.0002 00.30.004.000
00.30.007.0001
RELLENO PERFILADO SUBRASANTE 00.30.007.0001 00.30.007.000

00.25.001.0001
EXCAVACION EXCAVACION PARA PUESTA A T00.25.001.0001 00.25.001.000
00.25.001.0002
EXCAVACION EXCAVACION PARA CONDUIT 00.25.001.0002 00.25.001.000
00.25.003.0001
EXCAVACION EXCAVACION PARA BANCODUC00.25.003.0001 00.25.003.000
00.25.003.0002
EXCAVACION EXCAVACION PARA MANHOLES00.25.003.0002 00.25.003.000
00.25.003.0003
EXCAVACION EXCAVACION FUNDACIONES D00.25.003.0003 00.25.003.000
00.30.002.0001
RELLENO RELLENO PARA PUESTA A TIER 00.30.002.0001 00.30.002.000
00.30.002.0002
RELLENO RELLENO PARA CONDUIT 00.30.002.0002 00.30.002.000
00.30.003.0004
EXCAVACION RELLENO PARA BANCODUCTOS00.30.003.0004 00.30.003.000
00.30.003.0005
EXCAVACION RELLENO PARA MANHOLES 00.30.003.0005 00.30.003.000
00.30.003.0006
EXCAVACION RELLENO FUNDACIONES DE PA00.30.003.0006 00.30.003.000

10.20.001.0001
PERNO SUMINISTRO Y COLOCACION 10.20.001.0001 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0001 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0001 10.20.001.000
10.20.001.0002
PERNO SUMINISTRO Y COLOCACION 10.20.001.0002 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0002 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0002 10.20.001.000
10.20.001.0101
PERNO SUMINISTRO Y COLOCACION 10.20.001.0101 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0101 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0101 10.20.001.010
10.20.001.0102
PERNO SUMINISTRO Y COLOCACION 10.20.001.0102 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0102 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0102 10.20.001.010
10.20.001.0003
PERNO SUMINISTRO Y COLOCACION 10.20.001.0003 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0003 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0003 10.20.001.000
10.20.001.0004
PERNO SUMINISTRO Y COLOCACION 10.20.001.0004 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0004 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0004 10.20.001.000
10.20.001.0103
PERNO SUMINISTRO Y COLOCACION 10.20.001.0103 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0103 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0103 10.20.001.010
10.20.001.0104
PERNO SUMINISTRO Y COLOCACION 10.20.001.0104 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0104 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0104 10.20.001.010
10.20.002.0001
PERNO SUMINISTRO Y COLOCACION 10.20.002.0001 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0001 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0001 10.20.002.000
10.20.002.0002
PERNO SUMINISTRO Y COLOCACION 10.20.002.0002 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0002 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0002 10.20.002.000
10.40.001.0001
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0001 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0001 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0001 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0001 10.40.001.000
10.40.001.0002
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0002 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0002 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0002 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0002 10.40.001.000
10.40.001.0005
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0005 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0005 10.40.001.000
10.40.001.0006
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0006 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0006 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0006 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0006 10.40.001.000
10.40.001.0009
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0009 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0009 10.40.001.000
10.40.001.0026
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0026 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0026 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0026 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0026 10.40.001.002
10.40.001.0064
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0064 10.40.001.006
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0064 10.40.001.006
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0064 10.40.001.006
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0064 10.40.001.006
10.40.001.0069
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0069 10.40.001.006
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0069 10.40.001.006
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0069 10.40.001.006
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0069 10.40.001.006
10.40.002.2169
CONCRETO COLOCACION ACERO 10.40.002.2169 10.40.002.216
CONCRETO ENCOFRADO CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO VACIADO CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO DESCIMBRE CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO LIMPIEZA CONCRETO 10.40.002.2169 10.40.002.216
CONCRETO PUNCH LIST CONCRETO 10.40.002.2169 10.40.002.216
10.40.002.2801
CONCRETO COLOCACION ACERO 10.40.002.2801 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2801 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2801 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2801 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2801 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2801 10.40.002.280
10.40.002.2802
CONCRETO COLOCACION ACERO 10.40.002.2802 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2802 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2802 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2802 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2802 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2802 10.40.002.280
10.40.002.2805
CONCRETO COLOCACION ACERO 10.40.002.2805 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2805 10.40.002.280
10.40.002.2806
CONCRETO COLOCACION ACERO 10.40.002.2806 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2806 10.40.002.280
10.40.002.2809
CONCRETO COLOCACION ACERO 10.40.002.2809 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2809 10.40.002.280
10.40.002.2826
CONCRETO COLOCACION ACERO 10.40.002.2826 10.40.002.282
CONCRETO ENCOFRADO CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO VACIADO CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO DESCIMBRE CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO LIMPIEZA CONCRETO 10.40.002.2826 10.40.002.282
CONCRETO PUNCH LIST CONCRETO 10.40.002.2826 10.40.002.282
10.40.002.1564
CONCRETO COLOCACION ACERO 10.40.002.1564 10.40.002.156
CONCRETO ENCOFRADO CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO VACIADO CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO DESCIMBRE CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO LIMPIEZA CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO PUNCH LIST CONCRETO 10.40.002.1564 10.40.002.156
10.40.002.1565
CONCRETO COLOCACION ACERO 10.40.002.1565 10.40.002.156
CONCRETO ENCOFRADO CONCRETO 10.40.002.1565 10.40.002.156
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.1565 10.40.002.156
CONCRETO VACIADO CONCRETO 10.40.002.1565 10.40.002.156
CONCRETO DESCIMBRE CONCRETO 10.40.002.1565 10.40.002.156
CONCRETO LIMPIEZA CONCRETO 10.40.002.1565 10.40.002.156
CONCRETO PUNCH LIST CONCRETO 10.40.002.1565 10.40.002.156
10.60.002.1061
SOLADO ENCOFRADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO VACIADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO DESCIMBRE CONCRETO 10.60.002.1061 10.60.002.106
SOLADO LIMPIEZA CONCRETO 10.60.002.1061 10.60.002.106
SOLADO PUNCH LIST CONCRETO 10.60.002.1061 10.60.002.106

60.20.001.0003
ESCALERILLA PORTAC SUMINISTRO ESCALERILLA 60.20.001.0003 60.20.001.000
ESCALERILLA PORTAC MONTAJE ESCALERILLA 60.20.001.0003 60.20.001.000
ESCALERILLA PORTAC PROTOCOLO ESCALERILLA 60.20.001.0003 60.20.001.000
60.20.001.0005
ESCALERILLA PORTAC SUMINISTRO ESCALERILLA 60.20.001.0005 60.20.001.000
ESCALERILLA PORTAC MONTAJE ESCALERILLA 60.20.001.0005 60.20.001.000
ESCALERILLA PORTAC PROTOCOLO ESCALERILLA 60.20.001.0005 60.20.001.000
60.20.001.0006
ESCALERILLA PORTAC SUMINISTRO ESCALERILLA 60.20.001.0006 60.20.001.000
ESCALERILLA PORTAC MONTAJE ESCALERILLA 60.20.001.0006 60.20.001.000
ESCALERILLA PORTAC PROTOCOLO ESCALERILLA 60.20.001.0006 60.20.001.000
60.20.002.0002
CONDUIT SUMINISTRO CONDUIT 60.20.002.0002 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0002 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0002 60.20.002.000
60.20.002.0003
CONDUIT SUMINISTRO CONDUIT 60.20.002.0003 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0003 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0003 60.20.002.000
60.20.002.0004
CONDUIT SUMINISTRO CONDUIT 60.20.002.0004 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0004 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0004 60.20.002.000
60.20.002.0005
CONDUIT SUMINISTRO CONDUIT 60.20.002.0005 60.20.002.0005
CONDUIT MONTAJE CONDUIT 60.20.002.0005 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0005 60.20.002.000
60.20.002.0006
CONDUIT SUMINISTRO CONDUIT 60.20.002.0006 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0006 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0006 60.20.002.000
60.20.002.0007
CONDUIT SUMINISTRO CONDUIT 60.20.002.0007 60.20.002.0007
CONDUIT MONTAJE CONDUIT 60.20.002.0007 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0007 60.20.002.0007
60.20.002.0014
CONDUIT SUMINISTRO CONDUIT 60.20.002.0014 60.20.002.001
CONDUIT MONTAJE CONDUIT 60.20.002.0014 60.20.002.001
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0014 60.20.002.001
60.20.002.0043
CONDUIT SUMINISTRO CONDUIT 60.20.002.0043 60.20.002.004
CONDUIT MONTAJE CONDUIT 60.20.002.0043 60.20.002.004
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0043 60.20.002.004
60.20.002.0057
CONDUIT SUMINISTRO CONDUIT 60.20.002.0057 60.20.002.005
CONDUIT MONTAJE CONDUIT 60.20.002.0057 60.20.002.005
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0057 60.20.002.005
60.20.002.0058
CONDUIT SUMINISTRO CONDUIT 60.20.002.0058 60.20.002.005
CONDUIT MONTAJE CONDUIT 60.20.002.0058 60.20.002.005
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0058 60.20.002.005
60.30.001.9113
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.9113 60.30.001.911
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.9113 60.30.001.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.9113 60.30.001.911
60.30.002.1102
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.1102 60.30.002.110
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.1102 60.30.002.110
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.1102 60.30.002.110
60.30.002.1103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.1103 60.30.002.110
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.1103 60.30.002.110
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.1103 60.30.002.110
60.30.002.3103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.3103 60.30.002.310
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.3103 60.30.002.310
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.3103 60.30.002.310
60.30.002.3105
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.3105 60.30.002.310
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.3105 60.30.002.310
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.3105 60.30.002.310
60.30.002.6102
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6102 60.30.002.610
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6102 60.30.002.610
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6102 60.30.002.610
60.30.002.6103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6103 60.30.002.610
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6103 60.30.002.610
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6103 60.30.002.610
60.30.002.6306
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6306 60.30.002.630
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6306 60.30.002.630
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6306 60.30.002.630
60.30.002.6313
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6313 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6313 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6313 60.30.002.631
60.30.002.6314
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6314 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6314 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6314 60.30.002.631
60.30.002.6315
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6315 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6315 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6315 60.30.002.631
60.30.002.6409
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6409 60.30.002.640
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6409 60.30.002.640
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6409 60.30.002.640
60.30.002.6410
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6410 60.30.002.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6410 60.30.002.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6410 60.30.002.641
60.30.002.6411
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6411 60.30.002.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6411 60.30.002.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6411 60.30.002.641
60.30.002.6412
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6412 60.30.002.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6412 60.30.002.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6412 60.30.002.641
60.30.002.6414
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6414 60.30.002.641
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6414 60.30.002.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6414 60.30.002.641
60.30.002.6505
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6505 60.30.002.650
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6505 60.30.002.650
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6505 60.30.002.650
60.30.002.6507
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6507 60.30.002.650
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6507 60.30.002.650
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6507 60.30.002.650
60.30.002.6509
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6509 60.30.002.650
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6509 60.30.002.650
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6509 60.30.002.650
60.30.002.6511
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6511 60.30.002.651
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6511 60.30.002.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6511 60.30.002.651
60.30.002.6512
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6512 60.30.002.651
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6512 60.30.002.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6512 60.30.002.651
60.30.002.6513
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6513 60.30.002.651
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6513 60.30.002.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6513 60.30.002.651
60.30.002.6514
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6514 60.30.002.651
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6514 60.30.002.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6514 60.30.002.651
60.30.002.7002
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7002 60.30.002.700
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7002 60.30.002.700
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7002 60.30.002.700
60.30.002.7011
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7011 60.30.002.701
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7011 60.30.002.701
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7011 60.30.002.701
60.30.002.7012
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7012 60.30.002.701
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7012 60.30.002.701
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7012 60.30.002.701
60.30.002.7014
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7014 60.30.002.701
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7014 60.30.002.701
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7014 60.30.002.701
60.30.002.7021
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7021 60.30.002.702
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7021 60.30.002.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7021 60.30.002.702
60.30.002.7022
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7022 60.30.002.702
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7022 60.30.002.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7022 60.30.002.702
60.30.002.7221
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7221 60.30.002.722
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7221 60.30.002.722
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7221 60.30.002.722
60.30.002.7331
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7331 60.30.002.733
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7331 60.30.002.733
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7331 60.30.002.733
60.30.002.7334
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7334 60.30.002.733
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7334 60.30.002.733
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7334 60.30.002.733
60.30.002.7338
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7338 60.30.002.733
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7338 60.30.002.733
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7338 60.30.002.733
60.30.002.8101
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8101 60.30.002.810
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8101 60.30.002.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8101 60.30.002.810
60.30.002.8102
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8102 60.30.002.810
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8102 60.30.002.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8102 60.30.002.810
60.30.002.8300
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8300 60.30.002.830
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8300 60.30.002.830
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8300 60.30.002.830
60.30.002.9113
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.9113 60.30.002.911
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.9113 60.30.002.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.9113 60.30.002.911
60.30.002.9114
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.9114 60.30.002.911
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.9114 60.30.002.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.9114 60.30.002.911
60.40.001.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0001 60.40.001.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0001 60.40.001.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0001 60.40.001.000
60.40.001.0002
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0002 60.40.001.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0002 60.40.001.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0002 60.40.001.000
60.40.002.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0001 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0001 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0001 60.40.002.000
60.40.002.0002
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0002 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0002 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0002 60.40.002.000
60.40.002.0003
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0003 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0003 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0003 60.40.002.000
60.40.003.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.003.0001 60.40.003.0001
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.003.0001 60.40.003.0001
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.003.0001 60.40.003.0001
60.40.004.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.004.0001 60.40.004.0001
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.004.0001 60.40.004.0001
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.004.0001 60.40.004.0001
60.40.005.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.005.0001 60.40.005.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.005.0001 60.40.005.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.005.0001 60.40.005.000
60.40.006.0004
PARARRAYOS SUMINISTRO PARARRAYOS 60.40.006.0004 60.40.006.0004
PARARRAYOS MONTAJE PARARRAYOS 60.40.006.0004 60.40.006.0004
PARARRAYOS PROTOCOLO PARARRAYOS 60.40.006.0004 60.40.006.0004
60.50.001.1103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.1103 60.50.001.1103
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.1103 60.50.001.110
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.1103 60.50.001.1103
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.1103 60.50.001.1103
60.50.001.1122
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.1122 60.50.001.1122
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.1122 60.50.001.112
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.1122 60.50.001.1122
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.1122 60.50.001.1122
60.50.001.1425
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.1425 60.50.001.1425
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.1425 60.50.001.1425
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.1425 60.50.001.1425
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.1425 60.50.001.1425
60.50.001.3103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.3103 60.50.001.310
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.3103 60.50.001.310
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.3103 60.50.001.310
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.3103 60.50.001.310
60.50.001.3105
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.3105 60.50.001.3105
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.3105 60.50.001.310
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.3105 60.50.001.3105
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.3105 60.50.001.3105
60.50.001.6102
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6102 60.50.001.6102
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6102 60.50.001.610
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6102 60.50.001.6102
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6102 60.50.001.6102
60.50.001.6103
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6103 60.50.001.6103
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6103 60.50.001.610
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6103 60.50.001.610
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6103 60.50.001.610
60.50.001.6306
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6306 60.50.001.6306
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6306 60.50.001.6306
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6306 60.50.001.630
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6306 60.50.001.630
60.50.001.6313
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6313 60.50.001.6313
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6313 60.50.001.631
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6313 60.50.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6313 60.50.001.631
60.50.001.6314
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6314 60.50.001.631
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6314 60.50.001.631
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6314 60.50.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6314 60.50.001.631
60.50.001.6315
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6315 60.50.001.631
60.50.001.6409
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6409 60.50.001.640
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6409 60.50.001.640
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6409 60.50.001.640
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6409 60.50.001.640
60.50.001.6410
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6410 60.50.001.641
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6410 60.50.001.641
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6410 60.50.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6410 60.50.001.641
60.50.001.6411
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6411 60.50.001.6411
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6411 60.50.001.641
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6411 60.50.001.6411
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6411 60.50.001.6411
60.50.001.6412
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6412 60.50.001.641
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6412 60.50.001.641
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6412 60.50.001.641
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6412 60.50.001.641
60.50.001.6414
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6414 60.50.001.6414
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6414 60.50.001.641
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6414 60.50.001.6414
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6414 60.50.001.6414
60.50.001.6505
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6505 60.50.001.6505
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6505 60.50.001.650
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6505 60.50.001.6505
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6505 60.50.001.6505
60.50.001.6507
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6507 60.50.001.6507
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6507 60.50.001.650
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6507 60.50.001.6507
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6507 60.50.001.6507
60.50.001.6509
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6509 60.50.001.6509
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6509 60.50.001.650
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6509 60.50.001.6509
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6509 60.50.001.6509
60.50.001.6511
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6511 60.50.001.651
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6511 60.50.001.651
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6511 60.50.001.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6511 60.50.001.651
60.50.001.6512
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6512 60.50.001.651
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6512 60.50.001.651
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6512 60.50.001.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6512 60.50.001.651
60.50.001.6513
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6513 60.50.001.651
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6513 60.50.001.651
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6513 60.50.001.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6513 60.50.001.651
60.50.001.6514
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6514 60.50.001.651
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6514 60.50.001.651
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6514 60.50.001.651
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6514 60.50.001.651
60.50.001.7002
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7002 60.50.001.700
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7002 60.50.001.700
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7002 60.50.001.700
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7002 60.50.001.700
60.50.001.7011
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7011 60.50.001.701
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7011 60.50.001.701
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7011 60.50.001.701
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7011 60.50.001.701
60.50.001.7012
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7012 60.50.001.701
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7012 60.50.001.701
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7012 60.50.001.701
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7012 60.50.001.701
60.50.001.7014
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7014 60.50.001.7014
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7014 60.50.001.701
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7014 60.50.001.7014
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7014 60.50.001.7014
60.50.001.7021
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7021 60.50.001.702
60.50.001.7334
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7334 60.50.001.7334
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7334 60.50.001.733
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7334 60.50.001.7334
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7334 60.50.001.7334
60.50.001.7338
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7338 60.50.001.7338
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7338 60.50.001.733
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7338 60.50.001.7338
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7338 60.50.001.7338
60.50.001.9113
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.9113 60.50.001.911
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.9113 60.50.001.911
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.9113 60.50.001.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.9113 60.50.001.911
60.50.001.9114
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.9114 60.50.001.911
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.9114 60.50.001.911
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.9114 60.50.001.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.9114 60.50.001.911
60.60.002.0002
ACCESORIO ELECTRICO SUMINISTRO ACC. ELECTRICO 60.60.002.0002 60.60.002.0002
ACCESORIO ELECTRICO MONTAJE AC. ELECTRICO 60.60.002.0002 60.60.002.0002
ACCESORIO ELECTRICO PROTOCOLO AC. ELECTRICO 60.60.002.0002 60.60.002.0002
60.60.002.0004
ACCESORIO ELECTRICO SUMINISTRO ACC. ELECTRICO 60.60.002.0004 60.60.002.0004
ACCESORIO ELECTRICO MONTAJE AC. ELECTRICO 60.60.002.0004 60.60.002.000
ACCESORIO ELECTRICO PROTOCOLO AC. ELECTRICO 60.60.002.0004 60.60.002.0004
60.60.002.0005
ACCESORIO ELECTRICO SUMINISTRO ACC. ELECTRICO 60.60.002.0005 60.60.002.0005
ACCESORIO ELECTRICO MONTAJE AC. ELECTRICO 60.60.002.0005 60.60.002.000
ACCESORIO ELECTRICO PROTOCOLO AC. ELECTRICO 60.60.002.0005 60.60.002.0005
60.60.005.0034
LUMINARIA SUMINISTRO LUMINARIA 60.60.005.0034 60.60.005.003
LUMINARIA MONTAJE LUMINARIA 60.60.005.0034 60.60.005.003
LUMINARIA PROTOCOLO LUMINARIA 60.60.005.0034 60.60.005.003
60.60.005.0073
PROYECTOR LED SUMINISTRO PROYECTOR LED60.60.005.0073 60.60.005.0073
PROYECTOR LED MONTAJE PROYECTOR LED 60.60.005.0073 60.60.005.007
PROYECTOR LED PROTOCOLO PROYECTOR LED 60.60.005.0073 60.60.005.0073
60.60.005.0092
ILUMINACION EMERGESUMINISTRO ILUMINACION E 60.60.005.0092 60.60.005.0092
ILUMINACION EMERGEMONTAJE ILUMINACION EMER60.60.005.0092 60.60.005.009
ILUMINACION EMERGEPROTOCOLO ILUMINACION E 60.60.005.0092 60.60.005.0092
60.70.001.0005
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.001.0005 60.70.001.0005
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.001.0005 60.70.001.0005
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.001.0005 60.70.001.0005
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.001.0005 60.70.001.0005
60.70.001.0006
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.001.0006 60.70.001.0006
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.001.0006 60.70.001.0006
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.001.0006 60.70.001.0006
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.001.0006 60.70.001.0006
60.70.001.0007
TRANSFORMADOR SUMINISTRO TRANSFORMAD 60.70.001.0007 60.70.001.0007
TRANSFORMADOR MONTAJE TRANSFORMADOR 60.70.001.0007 60.70.001.0007
TRANSFORMADOR CONEXIONADO TRANSFORMA60.70.001.0007 60.70.001.0007
TRANSFORMADOR PROTOCOLOS TRANSFORMAD60.70.001.0007 60.70.001.0007
60.70.004.0002
PANEL RECEPCION PANEL 60.70.004.0002 60.70.004.0002
PANEL MONTAJE PANEL 60.70.004.0002 60.70.004.0002
PANEL CONEXIONADO PANEL 60.70.004.0002 60.70.004.0002
PANEL PROTOCOLOS PANEL 60.70.004.0002 60.70.004.0002
60.70.004.0003
PANEL RECEPCION PANEL 60.70.004.0003 60.70.004.0003
PANEL MONTAJE PANEL 60.70.004.0003 60.70.004.0003
PANEL CONEXIONADO PANEL 60.70.004.0003 60.70.004.0003
PANEL PROTOCOLOS PANEL 60.70.004.0003 60.70.004.0003
60.70.004.0004
PANEL RECEPCION PANEL 60.70.004.0004 60.70.004.0004
PANEL MONTAJE PANEL 60.70.004.0004 60.70.004.0004
PANEL CONEXIONADO PANEL 60.70.004.0004 60.70.004.0004
PANEL PROTOCOLOS PANEL 60.70.004.0004 60.70.004.0004
60.70.005.0002
SWITCHGEAR SUMINISTRO SWITCHGEAR 60.70.005.0002 60.70.005.0002
SWITCHGEAR MONTAJE SWITCHGEAR 60.70.005.0002 60.70.005.0002
SWITCHGEAR CONEXIONADO SWITCHGEAR 60.70.005.0002 60.70.005.0002
SWITCHGEAR PROTOCOLOS SWITCHGEAR 60.70.005.0002 60.70.005.0002
60.70.006.0004
MOTOR CONTROL CENTSUMINISTRO MOTOR CONTROL
60.70.006.0004 60.70.006.0004
MOTOR CONTROL CENTMONTAJE MOTOR CONTROL C60.70.006.0004 60.70.006.0004
MOTOR CONTROL CENTCONEXIONADO MOTOR CONTR60.70.006.0004 60.70.006.0004
MOTOR CONTROL CENTPROTOCOLOS MOTOR CONTRO60.70.006.0004 60.70.006.0004
60.70.006.0005
MOTOR CONTROL CENTSUMINISTRO MOTOR CONTROL
60.70.006.0005 60.70.006.0005
MOTOR CONTROL CENTMONTAJE MOTOR CONTROL C60.70.006.0005 60.70.006.0005
MOTOR CONTROL CENTCONEXIONADO MOTOR CONTR60.70.006.0005 60.70.006.0005
MOTOR CONTROL CENTPROTOCOLOS MOTOR CONTRO60.70.006.0005 60.70.006.0005
60.70.007.0001
VARIABLE FREQUENCY SUMINISTRO 60.70.007.0001 60.70.007.0001
VARIABLE FREQUENCY MONTAJE 60.70.007.0001 60.70.007.0001
VARIABLE FREQUENCY CONEXIONADO 60.70.007.0001 60.70.007.0001
VARIABLE FREQUENCY PROTOCOLOS 60.70.007.0001 60.70.007.0001
60.70.008.0101
BATERIA SUMINISTRO BATERIA 60.70.008.0101 60.70.008.0101
BATERIA MONTAJE BATERIA 60.70.008.0101 60.70.008.0101
BATERIA PROTOCOLO BATERIA 60.70.008.0101 60.70.008.0101
BATERIA PROTOCOLO BATERIA 60.70.008.0101 60.70.008.0101
60.70.009.0002
BATERIA SUMINISTRO BATERIA 60.70.009.0002 60.70.009.0002
BATERIA MONTAJE BATERIA 60.70.009.0002 60.70.009.0002
BATERIA CONEXIONADO BATERIA 60.70.009.0002 60.70.009.0002
BATERIA PROTOCOLO BATERIA 60.70.009.0002 60.70.009.0002
60.70.014.0002
BUSBAR SUMINISTRO BUSBAR 60.70.014.0002 60.70.014.0002
BUSBAR MONTAJE BUSBAR 60.70.014.0002 60.70.014.0002
BUSBAR CONEXIONADO BUSBAR 60.70.014.0002 60.70.014.0002
BUSBAR PROTOCOLO BUSBAR 60.70.014.0002 60.70.014.0002
60.70.020.0000
SALA ELECTRICA INSTALACION SALA ELECTRICA60.70.020.0000 60.70.020.000
60.70.030.0000
SALA ELECTRICA INSTALACION HARMONIC EQU60.70.030.0000 60.70.030.000

10.20.001.0001
PERNO SUMINISTRO Y COLOCACION 10.20.001.0001 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0001 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0001 10.20.001.000
10.20.001.0002
PERNO SUMINISTRO Y COLOCACION 10.20.001.0002 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0002 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0002 10.20.001.000
10.20.001.0101
PERNO SUMINISTRO Y COLOCACION 10.20.001.0101 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0101 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0101 10.20.001.010
10.20.001.0102
PERNO SUMINISTRO Y COLOCACION 10.20.001.0102 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0102 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0102 10.20.001.010
10.20.001.0003
PERNO SUMINISTRO Y COLOCACION 10.20.001.0003 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0003 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0003 10.20.001.000
10.20.001.0004
PERNO SUMINISTRO Y COLOCACION 10.20.001.0004 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0004 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0004 10.20.001.000
10.20.001.0103
PERNO SUMINISTRO Y COLOCACION 10.20.001.0103 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0103 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0103 10.20.001.010
10.20.001.0104
PERNO SUMINISTRO Y COLOCACION 10.20.001.0104 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0104 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0104 10.20.001.010
10.20.001.0008
PERNO SUMINISTRO Y COLOCACION 10.20.001.0008 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0008 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0008 10.20.001.000
10.20.001.0108
PERNO SUMINISTRO Y COLOCACION 10.20.001.0108 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0108 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0108 10.20.001.010
10.20.001.0012
PERNO SUMINISTRO Y COLOCACION 10.20.001.0012 10.20.001.001
PERNO LIMPIEZA PERNO 10.20.001.0012 10.20.001.001
PERNO PROTOCOLO PERNO 10.20.001.0012 10.20.001.001
10.20.001.0112
PERNO SUMINISTRO Y COLOCACION 10.20.001.0112 10.20.001.011
PERNO LIMPIEZA PERNO 10.20.001.0112 10.20.001.011
PERNO PROTOCOLO PERNO 10.20.001.0112 10.20.001.011
10.20.002.0001
PERNO SUMINISTRO Y COLOCACION 10.20.002.0001 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0001 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0001 10.20.002.000
10.20.002.0002
PERNO SUMINISTRO Y COLOCACION 10.20.002.0002 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0002 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0002 10.20.002.000
10.40.001.0005
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0005 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0005 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0005 10.40.001.000
10.40.001.0006
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0006 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0006 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0006 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0006 10.40.001.000
10.40.001.0009
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0009 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0009 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0009 10.40.001.000
10.40.001.0010
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0010 10.40.001.001
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0010 10.40.001.001
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0010 10.40.001.001
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0010 10.40.001.001
10.40.001.0011
ACERO REFUERZO DUR SUMINISTRO DE ACERO REFU 10.40.001.0011 10.40.001.001
ACERO REFUERZO DUR CORTADO ACERO REFUERZO 10.40.001.0011 10.40.001.001
ACERO REFUERZO DUR DOBLADO ACERO REFUERZO 10.40.001.0011 10.40.001.001
ACERO REFUERZO DUR PUNCH LIST ACERO REFUERZO10.40.001.0011 10.40.001.001
10.40.001.0027
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0027 10.40.001.002
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0027 10.40.001.002
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0027 10.40.001.002
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0027 10.40.001.002
10.40.002.2805
CONCRETO COLOCACION ACERO 10.40.002.2805 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2805 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2805 10.40.002.280
10.40.002.2806
CONCRETO COLOCACION ACERO 10.40.002.2806 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2806 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2806 10.40.002.280
10.40.002.2809
CONCRETO COLOCACION ACERO 10.40.002.2809 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2809 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2809 10.40.002.280
10.40.002.2810
CONCRETO COLOCACION ACERO 10.40.002.2810 10.40.002.281
CONCRETO ENCOFRADO CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO VACIADO CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO DESCIMBRE CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO LIMPIEZA CONCRETO 10.40.002.2810 10.40.002.281
CONCRETO PUNCH LIST CONCRETO 10.40.002.2810 10.40.002.281
10.40.002.2811
CONCRETO DURMIENTECOLOCACION ACERO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEENCOFRADO CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTETOPOGRAFIA CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEVACIADO CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEDESCIMBRE CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTELIMPIEZA CONCRETO 10.40.002.2811 10.40.002.281
CONCRETO DURMIENTEPUNCH LIST CONCRETO 10.40.002.2811 10.40.002.281
10.40.002.3527
CONCRETO COLOCACION ACERO 10.40.002.3527 10.40.002.352
CONCRETO ENCOFRADO CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO VACIADO CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO DESCIMBRE CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO LIMPIEZA CONCRETO 10.40.002.3527 10.40.002.352
CONCRETO PUNCH LIST CONCRETO 10.40.002.3527 10.40.002.352
10.60.002.1061
SOLADO ENCOFRADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO VACIADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO DESCIMBRE CONCRETO 10.60.002.1061 10.60.002.106
SOLADO LIMPIEZA CONCRETO 10.60.002.1061 10.60.002.106
SOLADO PUNCH LIST CONCRETO 10.60.002.1061 10.60.002.106

20.10.001.0003
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0003 20.10.001.000
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0003 20.10.001.000
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0003 20.10.001.000
20.10.001.0103
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0103 20.10.001.010
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0103 20.10.001.010
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0103 20.10.001.010
20.10.001.0203
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0203 20.10.001.020
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0203 20.10.001.020
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0203 20.10.001.020
20.10.001.0303
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0303 20.10.001.030
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0303 20.10.001.030
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0303 20.10.001.030
20.10.001.0403
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0403 20.10.001.040
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0403 20.10.001.040
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0403 20.10.001.040
20.10.001.0503
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0503 20.10.001.050
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0503 20.10.001.050
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0503 20.10.001.050
20.10.005.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.005.0003 20.10.005.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.005.0003 20.10.005.0003
20.10.006.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.006.0003 20.10.006.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.006.0003 20.10.006.000
20.10.009.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0003 20.10.009.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0003 20.10.009.000
20.10.009.0103
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0103 20.10.009.010
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0103 20.10.009.010
20.10.009.0203
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0203 20.10.009.020
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0203 20.10.009.020

30.10.001.2001
REVESTIMIENTO ARMADO Y MONTAJE REVEST 30.10.001.2001 30.10.001.20010
REVESTIMIENTO FIJACIONES REVESTIMIENTO 30.10.001.2001 30.10.001.20010
REVESTIMIENTO PROTOCOLOS REVESTIMIENTO30.10.001.2001 30.10.001.20010
30.10.002.2001
REVESTIMIENTO ARMADO Y MONTAJE REVEST 27300010003D 27300010003D0
REVESTIMIENTO FIJACIONES REVESTIMIENTO 27300010003D 27300010003D0
REVESTIMIENTO PROTOCOLOS REVESTIMIENTO27300010003D 27300010003D0

40.30.001.5016
VENTILACION RECEPCION VENTILADOR 40.30.001.5016 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5016 40.30.001.501
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5016 40.30.001.501
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5016 40.30.001.501
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5016 40.30.001.501
40.30.001.5017
VENTILACION RECEPCION VENTILADOR 40.30.001.5017 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5017 40.30.001.501
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5017 40.30.001.501
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5017 40.30.001.501
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5017 40.30.001.501
40.30.001.5018
VENTILACION RECEPCION VENTILADOR 40.30.001.5018 40.30.001.501
VENTILACION MONTAJE VENTILADOR 40.30.001.5018 40.30.001.501
VENTILACION MONTAJE DUCTERIA P/VENTI 40.30.001.5018 40.30.001.501
VENTILACION CONEXIONADO VENTILADOR 40.30.001.5018 40.30.001.501
VENTILACION PROTOCOLOS VENTILADOR 40.30.001.5018 40.30.001.501
40.60.001.1707
SUPRESOR DE POLVO SUMINISTRO BOMBA 40.60.001.1707 40.60.001.170
SUPRESOR DE POLVO MONTAJE BOMBA 40.60.001.1707 40.60.001.170
SUPRESOR DE POLVO CONEXIONADO BOMBA 40.60.001.1707 40.60.001.170
SUPRESOR DE POLVO PROTOCOLO BOMBA 40.60.001.1707 40.60.001.170
40.60.001.1708
SUPRESOR DE POLVO RECEPCION MOTOR ELECTRIC 40.60.001.1708 40.60.001.170
SUPRESOR DE POLVO MONTAJE BOMBA 40.60.001.1708 40.60.001.170
SUPRESOR DE POLVO CONEXIONADO MOTOR ELECT40.60.001.1708 40.60.001.170
SUPRESOR DE POLVO PROTOCOLOS MOTOR ELECTRI40.60.001.1708 40.60.001.170
40.70.001.2630
CHUTE DESCARGA RECEPCION MOTOR ELECTRIC 40.70.001.2630 40.70.001.263
CHUTE DESCARGA MONTAJE BOMBA 40.70.001.2630 40.70.001.263
CHUTE DESCARGA CONEXIONADO MOTOR ELECT40.70.001.2630 40.70.001.263
CHUTE DESCARGA PROTOCOLOS MOTOR ELECTRI40.70.001.2630 40.70.001.263
40.70.001.2631
CHUTE ALIMENTACION RECEPCION MOTOR ELECTRIC 40.70.001.2631 40.70.001.263
CHUTE ALIMENTACION MONTAJE BOMBA 40.70.001.2631 40.70.001.263
CHUTE ALIMENTACION CONEXIONADO MOTOR ELECT40.70.001.2631 40.70.001.263
CHUTE ALIMENTACION PROTOCOLOS MOTOR ELECTRI40.70.001.2631 40.70.001.263
40.70.001.3801
SUPRESOR DE POLVO RECEPCION SUPRESOR POLVO40.70.001.3801 40.70.001.380
SUPRESOR DE POLVO MONTAJE SUPRESOR POLVO 40.70.001.3801 40.70.001.380
SUPRESOR DE POLVO CONEXIONADO SUPRESOR PO40.70.001.3801 40.70.001.380
SUPRESOR DE POLVO PROTOCOLO SUPRESOR POLV 40.70.001.3801 40.70.001.380
40.70.001.3802
SUPRESOR DE POLVO RECEPCION SUPRESOR POLVO40.70.001.3802 40.70.001.380
SUPRESOR DE POLVO MONTAJE SUPRESOR POLVO 40.70.001.3802 40.70.001.380
SUPRESOR DE POLVO CONEXIONADO SUPRESOR PO40.70.001.3802 40.70.001.380
SUPRESOR DE POLVO PROTOCOLO SUPRESOR POLV 40.70.001.3802 40.70.001.380
40.70.001.3803
SUPRESOR DE POLVO RECEPCION SUPRESOR POLVO40.70.001.3803 40.70.001.380
SUPRESOR DE POLVO MONTAJE SUPRESOR POLVO 40.70.001.3803 40.70.001.380
SUPRESOR DE POLVO CONEXIONADO SUPRESOR PO40.70.001.3803 40.70.001.380
SUPRESOR DE POLVO PROTOCOLO SUPRESOR POLV 40.70.001.3803 40.70.001.380
40.70.001.3804
SUPRESOR DE POLVO RECEPCION SUPRESOR POLVO40.70.001.3804 40.70.001.380
SUPRESOR DE POLVO MONTAJE SUPRESOR POLVO 40.70.001.3804 40.70.001.380
SUPRESOR DE POLVO CONEXIONADO SUPRESOR PO40.70.001.3804 40.70.001.380
SUPRESOR DE POLVO PROTOCOLO SUPRESOR POLV 40.70.001.3804 40.70.001.380
40.80.001.218
FAJA TRANSPORTADORRECEPCION 40.80.001.218 40.80.001.218
FAJA TRANSPORTADORMONTAJE ELEMENTOS ESTRUC40.80.001.218 40.80.001.218
FAJA TRANSPORTADORMONTAJE ELEMENTOS MECAN40.80.001.218 40.80.001.218
FAJA TRANSPORTADORMONTAJE CHUTES 40.80.001.218 40.80.001.218
FAJA TRANSPORTADORCONEXIONADO Y PRUEBAS 40.80.001.218 40.80.001.218
FAJA TRANSPORTADORPROTOCOLOS ENTREGA 40.80.001.218 40.80.001.218
83.10.003.3002
GALERIAS RECEPCION MOTOR ELECTRIC 83.10.003.3002 83.10.003.3002
GALERIAS MONTAJE BOMBA 83.10.003.3002 83.10.003.300
GALERIAS CONEXIONADO MOTOR ELECT83.10.003.3002 83.10.003.3002
GALERIAS PROTOCOLOS MOTOR ELECTRI83.10.003.3002 83.10.003.3002
40.80.001.249
GALERIAS VIGA CANTIL RECEPCION 40.80.001.249 40.80.001.249
GALERIAS VIGA CANTIL MONTAJE ELEMENTOS ESTRUC40.80.001.249 40.80.001.249
GALERIAS VIGA CANTIL MONTAJE ELEMENTOS MECAN40.80.001.249 40.80.001.249
GALERIAS VIGA CANTIL MONTAJE CHUTES 40.80.001.249 40.80.001.249
GALERIAS VIGA CANTIL CONEXIONADO Y PRUEBAS 40.80.001.249 40.80.001.249
GALERIAS VIGA CANTIL PROTOCOLOS ENTREGA 40.80.001.249 40.80.001.249
40.80.001.250
GALERIAS VIGA CANTIL RECEPCION 40.80.001.250 40.80.001.250
GALERIAS VIGA CANTIL MONTAJE ELEMENTOS ESTRUC40.80.001.250 40.80.001.250
GALERIAS VIGA CANTIL MONTAJE ELEMENTOS MECAN40.80.001.250 40.80.001.250
GALERIAS VIGA CANTIL MONTAJE CHUTES 40.80.001.250 40.80.001.250
GALERIAS VIGA CANTIL CONEXIONADO Y PRUEBAS 40.80.001.250 40.80.001.250
GALERIAS VIGA CANTIL PROTOCOLOS ENTREGA 40.80.001.250 40.80.001.250
40.80.001.251
GALERIAS VIGA CANTIL RECEPCION 40.80.001.251 40.80.001.251
GALERIAS VIGA CANTIL MONTAJE ELEMENTOS ESTRUC40.80.001.251 40.80.001.251
GALERIAS VIGA CANTIL MONTAJE ELEMENTOS MECAN40.80.001.251 40.80.001.251
GALERIAS VIGA CANTIL MONTAJE CHUTES 40.80.001.251 40.80.001.251
GALERIAS VIGA CANTIL CONEXIONADO Y PRUEBAS 40.80.001.251 40.80.001.251
GALERIAS VIGA CANTIL PROTOCOLOS ENTREGA 40.80.001.251 40.80.001.251
40.80.001.252
MESAS DE IMPACTO RECEPCION 40.80.001.252 40.80.001.252
MESAS DE IMPACTO MONTAJE ELEMENTOS ESTRUC40.80.001.252 40.80.001.252
MESAS DE IMPACTO MONTAJE ELEMENTOS MECAN40.80.001.252 40.80.001.252
MESAS DE IMPACTO MONTAJE CHUTES 40.80.001.252 40.80.001.252
MESAS DE IMPACTO CONEXIONADO Y PRUEBAS 40.80.001.252 40.80.001.252
MESAS DE IMPACTO PROTOCOLOS ENTREGA 40.80.001.252 40.80.001.252
40.80.001.253
MESAS CARGA RECEPCION 40.80.001.253 40.80.001.253
MESAS CARGA MONTAJE ELEMENTOS ESTRUC40.80.001.253 40.80.001.253
MESAS CARGA MONTAJE ELEMENTOS MECAN40.80.001.253 40.80.001.253
MESAS CARGA MONTAJE CHUTES 40.80.001.253 40.80.001.253
MESAS CARGA CONEXIONADO Y PRUEBAS 40.80.001.253 40.80.001.253
MESAS CARGA PROTOCOLOS ENTREGA 40.80.001.253 40.80.001.253
40.80.001.254
POLEA DE CABEZA RECEPCION 40.80.001.254 40.80.001.254
POLEA DE CABEZA MONTAJE ELEMENTOS ESTRUC40.80.001.254 40.80.001.254
POLEA DE CABEZA MONTAJE ELEMENTOS MECAN40.80.001.254 40.80.001.254
POLEA DE CABEZA MONTAJE CHUTES 40.80.001.254 40.80.001.254
POLEA DE CABEZA CONEXIONADO Y PRUEBAS 40.80.001.254 40.80.001.254
POLEA DE CABEZA PROTOCOLOS ENTREGA 40.80.001.254 40.80.001.254
40.80.001.255
POLEA DE COLA RECEPCION 40.80.001.255 40.80.001.255
POLEA DE COLA MONTAJE ELEMENTOS ESTRUC40.80.001.255 40.80.001.255
POLEA DE COLA MONTAJE ELEMENTOS MECAN40.80.001.255 40.80.001.255
POLEA DE COLA MONTAJE CHUTES 40.80.001.255 40.80.001.255
POLEA DE COLA CONEXIONADO Y PRUEBAS 40.80.001.255 40.80.001.255
POLEA DE COLA PROTOCOLOS ENTREGA 40.80.001.255 40.80.001.255
40.80.001.256
TAKE UP ASSEMBLY RECEPCION 40.80.001.256 40.80.001.256
TAKE UP ASSEMBLY MONTAJE ELEMENTOS ESTRUC40.80.001.256 40.80.001.256
TAKE UP ASSEMBLY MONTAJE ELEMENTOS MECAN40.80.001.256 40.80.001.256
TAKE UP ASSEMBLY MONTAJE CHUTES 40.80.001.256 40.80.001.256
TAKE UP ASSEMBLY CONEXIONADO Y PRUEBAS 40.80.001.256 40.80.001.256
TAKE UP ASSEMBLY PROTOCOLOS ENTREGA 40.80.001.256 40.80.001.256
40.80.001.257
COUNTERWEIGHT ASSERECEPCION 40.80.001.257 40.80.001.257
COUNTERWEIGHT ASSEMONTAJE ELEMENTOS ESTRUC40.80.001.257 40.80.001.257
COUNTERWEIGHT ASSEMONTAJE ELEMENTOS MECAN40.80.001.257 40.80.001.257
COUNTERWEIGHT ASSEMONTAJE CHUTES 40.80.001.257 40.80.001.257
COUNTERWEIGHT ASSECONEXIONADO Y PRUEBAS 40.80.001.257 40.80.001.257
COUNTERWEIGHT ASSEPROTOCOLOS ENTREGA 40.80.001.257 40.80.001.257
40.80.001.258
MOTOR ELECTRICO GEARECEPCION 40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEAMONTAJE ELEMENTOS ESTRUC40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEAMONTAJE ELEMENTOS MECAN40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEAMONTAJE CHUTES 40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEACONEXIONADO Y PRUEBAS 40.80.001.258 40.80.001.258
MOTOR ELECTRICO GEAPROTOCOLOS ENTREGA 40.80.001.258 40.80.001.258
40.80.001.259
MOTOR ELECTRICO GEARECEPCION 40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEAMONTAJE ELEMENTOS ESTRUC40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEAMONTAJE ELEMENTOS MECAN40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEAMONTAJE CHUTES 40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEACONEXIONADO Y PRUEBAS 40.80.001.259 40.80.001.259
MOTOR ELECTRICO GEAPROTOCOLOS ENTREGA 40.80.001.259 40.80.001.259
40.80.001.260
BALANZA FAJA RECEPCION 40.80.001.260 40.80.001.260
BALANZA FAJA MONTAJE ELEMENTOS ESTRUC40.80.001.260 40.80.001.260
BALANZA FAJA MONTAJE ELEMENTOS MECAN40.80.001.260 40.80.001.260
BALANZA FAJA MONTAJE CHUTES 40.80.001.260 40.80.001.260
BALANZA FAJA CONEXIONADO Y PRUEBAS 40.80.001.260 40.80.001.260
BALANZA FAJA PROTOCOLOS ENTREGA 40.80.001.260 40.80.001.260
40.80.001.261
WINCHE MANTENIMIENRECEPCION 40.80.001.261 40.80.001.261
WINCHE MANTENIMIENMONTAJE ELEMENTOS ESTRUC40.80.001.261 40.80.001.261
WINCHE MANTENIMIENMONTAJE ELEMENTOS MECAN40.80.001.261 40.80.001.261
WINCHE MANTENIMIENMONTAJE CHUTES 40.80.001.261 40.80.001.261
WINCHE MANTENIMIENCONEXIONADO Y PRUEBAS 40.80.001.261 40.80.001.261
WINCHE MANTENIMIENPROTOCOLOS ENTREGA 40.80.001.261 40.80.001.261
40.80.001.262
WINCHE MANTENIMIENT
RECEPCION 40.80.001.262 40.80.001.262
WINCHE MANTENIMIENT
MONTAJE ELEMENTOS ESTRUC40.80.001.262 40.80.001.262
WINCHE MANTENIMIENT
MONTAJE ELEMENTOS MECAN40.80.001.262 40.80.001.262
WINCHE MANTENIMIENT
MONTAJE CHUTES 40.80.001.262 40.80.001.262
WINCHE MANTENIMIENT
CONEXIONADO Y PRUEBAS 40.80.001.262 40.80.001.262
WINCHE MANTENIMIENT
PROTOCOLOS ENTREGA 40.80.001.262 40.80.001.262
40.80.001.263
FRENO POLEA MOTRIZ RECEPCION 40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ MONTAJE ELEMENTOS ESTRUC40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ MONTAJE ELEMENTOS MECAN40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ MONTAJE CHUTES 40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ CONEXIONADO Y PRUEBAS 40.80.001.263 40.80.001.263
FRENO POLEA MOTRIZ PROTOCOLOS ENTREGA 40.80.001.263 40.80.001.263
40.80.001.264
MOTOR BOMBA POLEARECEPCION 40.80.001.264 40.80.001.264
MOTOR BOMBA POLEAMONTAJE ELEMENTOS ESTRUC40.80.001.264 40.80.001.264
MOTOR BOMBA POLEAMONTAJE ELEMENTOS MECAN40.80.001.264 40.80.001.264
MOTOR BOMBA POLEAMONTAJE CHUTES 40.80.001.264 40.80.001.264
MOTOR BOMBA POLEACONEXIONADO Y PRUEBAS 40.80.001.264 40.80.001.264
MOTOR BOMBA POLEAPROTOCOLOS ENTREGA 40.80.001.264 40.80.001.264
40.80.001.265
FRENO POLEA MOTRIZ RECEPCION 40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ MONTAJE ELEMENTOS ESTRUC40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ MONTAJE ELEMENTOS MECAN40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ MONTAJE CHUTES 40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ CONEXIONADO Y PRUEBAS 40.80.001.265 40.80.001.265
FRENO POLEA MOTRIZ PROTOCOLOS ENTREGA 40.80.001.265 40.80.001.265
40.80.001.266
MOTOR BOMBA POLEARECEPCION 40.80.001.266 40.80.001.266
MOTOR BOMBA POLEAMONTAJE ELEMENTOS ESTRUC40.80.001.266 40.80.001.266
MOTOR BOMBA POLEAMONTAJE ELEMENTOS MECAN40.80.001.266 40.80.001.266
MOTOR BOMBA POLEAMONTAJE CHUTES 40.80.001.266 40.80.001.266
MOTOR BOMBA POLEACONEXIONADO Y PRUEBAS 40.80.001.266 40.80.001.266
MOTOR BOMBA POLEAPROTOCOLOS ENTREGA 40.80.001.266 40.80.001.266
40.80.001.267
FRENO CABESTRANTE RECEPCION 40.80.001.267 40.80.001.267
FRENO CABESTRANTE MONTAJE ELEMENTOS ESTRUC40.80.001.267 40.80.001.267
FRENO CABESTRANTE MONTAJE ELEMENTOS MECAN40.80.001.267 40.80.001.267
FRENO CABESTRANTE MONTAJE CHUTES 40.80.001.267 40.80.001.267
FRENO CABESTRANTE CONEXIONADO Y PRUEBAS 40.80.001.267 40.80.001.267
FRENO CABESTRANTE PROTOCOLOS ENTREGA 40.80.001.267 40.80.001.267
40.80.001.268
MOTOR BOMBA FRENORECEPCION 40.80.001.268 40.80.001.268
MOTOR BOMBA FRENOMONTAJE ELEMENTOS ESTRUC40.80.001.268 40.80.001.268
MOTOR BOMBA FRENOMONTAJE ELEMENTOS MECAN40.80.001.268 40.80.001.268
MOTOR BOMBA FRENOMONTAJE CHUTES 40.80.001.268 40.80.001.268
MOTOR BOMBA FRENOCONEXIONADO Y PRUEBAS 40.80.001.268 40.80.001.268
MOTOR BOMBA FRENOPROTOCOLOS ENTREGA 40.80.001.268 40.80.001.268
40.80.001.269
SISTEMA DE ENFRIAMI RECEPCION 40.80.001.269 40.80.001.269
SISTEMA DE ENFRIAMI MONTAJE ELEMENTOS ESTRUC40.80.001.269 40.80.001.269
SISTEMA DE ENFRIAMI MONTAJE ELEMENTOS MECAN40.80.001.269 40.80.001.269
SISTEMA DE ENFRIAMI MONTAJE CHUTES 40.80.001.269 40.80.001.269
SISTEMA DE ENFRIAMI CONEXIONADO Y PRUEBAS 40.80.001.269 40.80.001.269
SISTEMA DE ENFRIAMI PROTOCOLOS ENTREGA 40.80.001.269 40.80.001.269
40.80.001.270
BOMBA 1 ENFRIAMIEN RECEPCION 40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN MONTAJE ELEMENTOS ESTRUC40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN MONTAJE ELEMENTOS MECAN40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN MONTAJE CHUTES 40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN CONEXIONADO Y PRUEBAS 40.80.001.270 40.80.001.270
BOMBA 1 ENFRIAMIEN PROTOCOLOS ENTREGA 40.80.001.270 40.80.001.270
40.80.001.271
BOMBA 2 ENFRIAMIEN RECEPCION 40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN MONTAJE ELEMENTOS ESTRUC40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN MONTAJE ELEMENTOS MECAN40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN MONTAJE CHUTES 40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN CONEXIONADO Y PRUEBAS 40.80.001.271 40.80.001.271
BOMBA 2 ENFRIAMIEN PROTOCOLOS ENTREGA 40.80.001.271 40.80.001.271
40.80.001.272
UNIDAD DE ENFRIAMIERECEPCION 40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS ESTRUC40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS MECAN40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIEMONTAJE CHUTES 40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIECONEXIONADO Y PRUEBAS 40.80.001.272 40.80.001.272
UNIDAD DE ENFRIAMIEPROTOCOLOS ENTREGA 40.80.001.272 40.80.001.272
40.80.001.273
UNIDAD DE ENFRIAMIERECEPCION 40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS ESTRUC40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS MECAN40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIEMONTAJE CHUTES 40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIECONEXIONADO Y PRUEBAS 40.80.001.273 40.80.001.273
UNIDAD DE ENFRIAMIEPROTOCOLOS ENTREGA 40.80.001.273 40.80.001.273
40.80.001.274
UNIDAD DE ENFRIAMIERECEPCION 40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS ESTRUC40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIEMONTAJE ELEMENTOS MECAN40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIEMONTAJE CHUTES 40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIECONEXIONADO Y PRUEBAS 40.80.001.274 40.80.001.274
UNIDAD DE ENFRIAMIEPROTOCOLOS ENTREGA 40.80.001.274 40.80.001.274
40.80.001.275
SISTEMA DE ENFRIAMI RECEPCION 40.80.001.275 40.80.001.275
SISTEMA DE ENFRIAMI MONTAJE ELEMENTOS ESTRUC40.80.001.275 40.80.001.275
SISTEMA DE ENFRIAMI MONTAJE ELEMENTOS MECAN40.80.001.275 40.80.001.275
SISTEMA DE ENFRIAMI MONTAJE CHUTES 40.80.001.275 40.80.001.275
SISTEMA DE ENFRIAMI CONEXIONADO Y PRUEBAS 40.80.001.275 40.80.001.275
SISTEMA DE ENFRIAMI PROTOCOLOS ENTREGA 40.80.001.275 40.80.001.275
40.80.001.276
IDLER GUARDING RECEPCION 40.80.001.276 40.80.001.276
IDLER GUARDING MONTAJE ELEMENTOS ESTRUC40.80.001.276 40.80.001.276
IDLER GUARDING MONTAJE ELEMENTOS MECAN40.80.001.276 40.80.001.276
IDLER GUARDING MONTAJE CHUTES 40.80.001.276 40.80.001.276
IDLER GUARDING CONEXIONADO Y PRUEBAS 40.80.001.276 40.80.001.276
IDLER GUARDING PROTOCOLOS ENTREGA 40.80.001.276 40.80.001.276
40.80.001.3201
POLIPLASTO MANTENCIRECEPCION 40.80.001.3201 40.80.001.3201
POLIPLASTO MANTENCIMONTAJE ELEMENTOS ESTRUC40.80.001.3201 40.80.001.3201
POLIPLASTO MANTENCIMONTAJE ELEMENTOS MECAN40.80.001.3201 40.80.001.3201
POLIPLASTO MANTENCIMONTAJE CHUTES 40.80.001.3201 40.80.001.3201
40.80.001.3205
POLIPLASTO POLEA CA RECEPCION 40.80.001.3205 40.80.001.3205
POLIPLASTO POLEA CA MONTAJE ELEMENTOS ESTRUC40.80.001.3205 40.80.001.3205
POLIPLASTO POLEA CA MONTAJE ELEMENTOS MECAN40.80.001.3205 40.80.001.3205
POLIPLASTO POLEA CA MONTAJE CHUTES 40.80.001.3205 40.80.001.3205
40.80.001.3206
POLIPLASTO MANTENCIRECEPCION 40.80.001.3206 40.80.001.3206
POLIPLASTO MANTENCIMONTAJE ELEMENTOS ESTRUC40.80.001.3206 40.80.001.3206
POLIPLASTO MANTENCIMONTAJE ELEMENTOS MECAN40.80.001.3206 40.80.001.3206
POLIPLASTO MANTENCIMONTAJE CHUTES 40.80.001.3206 40.80.001.3206

70.20.001.0003
PESOMETRO RECEPCION PESOMETRO 70.20.001.0003 70.20.001.000
PESOMETRO MONTAJE PESOMETRO 70.20.001.0003 70.20.001.000
PESOMETRO CONEXIONADO PESOMETRO 70.20.001.0003 70.20.001.000
PESOMETRO CONTRASTACION PESOMETRO70.20.001.0003 70.20.001.000
PESOMETRO PROTOCOLOS PESOMETRO 70.20.001.0003 70.20.001.000
70.20.001.0015
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0015 70.20.001.001
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0015 70.20.001.001
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0015 70.20.001.001
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0015 70.20.001.001
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0015 70.20.001.001
70.20.001.0016
INDICADOR RECEPCION INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR MONTAJE INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR CONEXIONADO INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR CONTRASTACION INDICADOR 70.20.001.0016 70.20.001.001
INDICADOR PROTOCOLOS INDICADOR 70.20.001.0016 70.20.001.001
70.20.001.0020
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0020 70.20.001.002
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0020 70.20.001.002
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0020 70.20.001.002
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0020 70.20.001.002
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0020 70.20.001.002
70.20.001.0031
SENSOR RECEPCION SENSOR 70.20.001.0031 70.20.001.003
SENSOR MONTAJE SENSOR 70.20.001.0031 70.20.001.003
SENSOR CONEXIONADO SENSOR 70.20.001.0031 70.20.001.003
SENSOR CONTRASTACION SENSOR 70.20.001.0031 70.20.001.003
SENSOR PROTOCOLOS SENSOR 70.20.001.0031 70.20.001.003
70.20.001.0032
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0032 70.20.001.003
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0032 70.20.001.003
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0032 70.20.001.003
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0032 70.20.001.003
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0032 70.20.001.003
70.20.001.0038
SIRENA RECEPCION SIRENA 70.20.001.0038 70.20.001.003
SIRENA MONTAJE SIRENA 70.20.001.0038 70.20.001.003
SIRENA CONEXIONADO SIRENA 70.20.001.0038 70.20.001.003
SIRENA CONTRASTACION SIRENA 70.20.001.0038 70.20.001.003
SIRENA PROTOCOLOS SIRENA 70.20.001.0038 70.20.001.003
70.20.001.0039
BALIZA RECEPCION BALIZA 70.20.001.0039 70.20.001.003
BALIZA MONTAJE BALIZA 70.20.001.0039 70.20.001.003
BALIZA CONEXIONADO BALIZA 70.20.001.0039 70.20.001.003
BALIZA CONTRASTACION BALIZA 70.20.001.0039 70.20.001.003
BALIZA PROTOCOLO BALIZA 70.20.001.0039 70.20.001.003
70.20.001.0040
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0040 70.20.001.004
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0040 70.20.001.004
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0040 70.20.001.004
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0040 70.20.001.004
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0040 70.20.001.004
70.20.001.0041
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0041 70.20.001.004
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0041 70.20.001.004
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0041 70.20.001.004
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0041 70.20.001.004
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0041 70.20.001.004
70.20.001.0042
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0042 70.20.001.004
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0042 70.20.001.004
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0042 70.20.001.004
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0042 70.20.001.004
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0042 70.20.001.004
70.20.001.0044
SENSOR RECEPCION SENSOR 70.20.001.0044 70.20.001.004
SENSOR MONTAJE SENSOR 70.20.001.0044 70.20.001.004
SENSOR CONEXIONADO SENSOR 70.20.001.0044 70.20.001.004
SENSOR CONTRASTACION SENSOR 70.20.001.0044 70.20.001.004
SENSOR PROTOCOLOS SENSOR 70.20.001.0044 70.20.001.004
70.20.001.0048
DETECCION DE RUPTURRECEPCION UNIDAD DETECCI 70.20.001.0048 70.20.001.004
DETECCION DE RUPTURMONTAJE UNIDAD DETECCIO 70.20.001.0048 70.20.001.004
DETECCION DE RUPTURCONEXIONADO UNIDAD DETE70.20.001.0048 70.20.001.004
DETECCION DE RUPTURCONTRASTACION UNIDAD DET70.20.001.0048 70.20.001.004
DETECCION DE RUPTURPROTOCOLOS UNIDAD DETECC70.20.001.0048 70.20.001.004
70.20.001.0049
SENSOR RECEPCION SENSOR 70.20.001.0049 70.20.001.004
SENSOR MONTAJE SENSOR 70.20.001.0049 70.20.001.004
SENSOR CONEXIONADO SENSOR 70.20.001.0049 70.20.001.004
SENSOR CONTRASTACION SENSOR 70.20.001.0049 70.20.001.004
SENSOR PROTOCOLOS SENSOR 70.20.001.0049 70.20.001.004
70.20.001.0050
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0050 70.20.001.005
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0050 70.20.001.005
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0050 70.20.001.005
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0050 70.20.001.005
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0050 70.20.001.005
70.20.001.0052
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0052 70.20.001.005
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0052 70.20.001.005
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0052 70.20.001.005
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0052 70.20.001.005
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0052 70.20.001.005
70.20.001.0053
SENSOR RECEPCION SENSOR 70.20.001.0053 70.20.001.005
SENSOR MONTAJE SENSOR 70.20.001.0053 70.20.001.005
SENSOR CONEXIONADO SENSOR 70.20.001.0053 70.20.001.005
SENSOR CONTRASTACION SENSOR 70.20.001.0053 70.20.001.005
SENSOR PROTOCOLOS SENSOR 70.20.001.0053 70.20.001.005
70.20.001.00X2
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.00X2 70.20.001.00X
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.00X2 70.20.001.00X
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.00X2 70.20.001.00X
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.00X2 70.20.001.00X
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.00X2 70.20.001.00X
70.20.001.00X3
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.00X3 70.20.001.00X
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.00X3 70.20.001.00X
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.00X3 70.20.001.00X
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.00X3 70.20.001.00X
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.00X3 70.20.001.00X
70.20.005.0001
PANEL RECEPCION PANEL 70.20.005.0001 70.20.005.000
PANEL MONTAJE PANEL 70.20.005.0001 70.20.005.000
PANEL CONEXIONADO PANEL 70.20.005.0001 70.20.005.000
PANEL CONTRASTACION PANEL 70.20.005.0001 70.20.005.000
PANEL PROTOCOLOS PANEL 70.20.005.0001 70.20.005.000
70.20.005.0002
PANEL RECEPCION PANEL 70.20.005.0002 70.20.005.000
PANEL MONTAJE PANEL 70.20.005.0002 70.20.005.000
PANEL CONEXIONADO PANEL 70.20.005.0002 70.20.005.000
PANEL CONTRASTACION PANEL 70.20.005.0002 70.20.005.000
PANEL PROTOCOLOS PANEL 70.20.005.0002 70.20.005.000
70.20.008.0005
PLACA DE MONTAJE RECEPCION PLACAS DE MONTA
70.20.008.0005 70.20.008.000
PLACA DE MONTAJE MONTAJE PLACAS DE MONTAJ70.20.008.0005 70.20.008.000
PLACA DE MONTAJE CONEXIONADO PLACAS DE MO70.20.008.0005 70.20.008.000
PLACA DE MONTAJE CONTRASTACION PLACAS DE 70.20.008.0005 70.20.008.000
PLACA DE MONTAJE PROTOCOLOS PLACA DE MONT70.20.008.0005 70.20.008.000
70.40.002.0002
CAJA DE CONEXION RECEPCION INSTRUMENTOS 70.40.002.0002 70.40.002.000
CAJA DE CONEXION MONTAJE INSTRUMENTOS 70.40.002.0002 70.40.002.000
CAJA DE CONEXION CONEXIONADO INSTRUMENTO70.40.002.0002 70.40.002.000
CAJA DE CONEXION CONTRASTACION INSTRUMEN70.40.002.0002 70.40.002.000
CAJA DE CONEXION PROTOCOLOS INSTRUMENTOS70.40.002.0002 70.40.002.000
70.40.002.0005
RACK REMOTO RECEPCION INSTRUMENTOS 70.40.002.0005 70.40.002.000
RACK REMOTO MONTAJE INSTRUMENTOS 70.40.002.0005 70.40.002.000
RACK REMOTO CONEXIONADO INSTRUMENTO70.40.002.0005 70.40.002.000
RACK REMOTO CONTRASTACION INSTRUMEN70.40.002.0005 70.40.002.000
RACK REMOTO PROTOCOLOS INSTRUMENTOS70.40.002.0005 70.40.002.000
70.60.001.0002
CAMARA CCTV RECEPCION INSTRUMENTOS 70.60.001.0002 70.60.001.000
CAMARA CCTV MONTAJE INSTRUMENTOS 70.60.001.0002 70.60.001.000
CAMARA CCTV CONEXIONADO INSTRUMENTO70.60.001.0002 70.60.001.000
CAMARA CCTV CONTRASTACION INSTRUMEN70.60.001.0002 70.60.001.000
CAMARA CCTV PROTOCOLOS INSTRUMENTOS70.60.001.0002 70.60.001.000
70.60.001.0003
GABINETE CCTV RECEPCION INSTRUMENTOS 70.60.001.0003 70.60.001.000
GABINETE CCTV MONTAJE INSTRUMENTOS 70.60.001.0003 70.60.001.000
GABINETE CCTV CONEXIONADO INSTRUMENTO70.60.001.0003 70.60.001.000
GABINETE CCTV CONTRASTACION INSTRUMEN70.60.001.0003 70.60.001.000
GABINETE CCTV PROTOCOLOS INSTRUMENTOS70.60.001.0003 70.60.001.000

20.10.001.0003
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0003 20.10.001.000
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0003 20.10.001.0003
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0003 20.10.001.000
20.10.001.0103
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0103 20.10.001.010
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0103 20.10.001.010
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0103 20.10.001.010
20.10.001.0203
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0203 20.10.001.020
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0203 20.10.001.0203
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0203 20.10.001.020
20.10.005.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.005.0003 20.10.005.0003
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.005.0003 20.10.005.0003
20.10.008.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.008.0003 20.10.008.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.008.0003 20.10.008.000
20.10.009.0003
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0003 20.10.009.000
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0003 20.10.009.000
20.10.009.0103
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0103 20.10.009.010
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0103 20.10.009.010
20.10.009.0203
ESTRUCTURA ACERO AUMONTAJE EST. ACERO AUXILI 20.10.009.0203 20.10.009.020
ESTRUCTURA ACERO AUPUNC LIST EST.ACERO AUXILIA20.10.009.0203 20.10.009.020

00.25.001.0001
EXCAVACION EXCAVACION PARA PUESTA A T00.25.001.0001 00.25.001.000
00.25.001.0002
EXCAVACION EXCAVACION PARA CONDUIT 00.25.001.0002 00.25.001.000
00.25.003.0001
EXCAVACION EXCAVACION PARA BANCODUC00.25.003.0001 00.25.003.000
00.25.003.0002
EXCAVACION EXCAVACION PARA MANHOLES00.25.003.0002 00.25.003.000
00.25.003.0003
EXCAVACION EXCAVACION FUNDACIONES D00.25.003.0003 00.25.003.000
00.30.002.0001
RELLENO RELLENO PARA PUESTA A TIER 00.30.002.0001 00.30.002.000
00.30.002.0002
RELLENO RELLENO PARA CONDUIT 00.30.002.0002 00.30.002.000
00.30.003.0004
EXCAVACION RELLENO PARA BANCODUCTOS00.30.003.0004 00.30.003.000
00.30.003.0005
EXCAVACION RELLENO PARA MANHOLES 00.30.003.0005 00.30.003.000
00.30.003.0006
EXCAVACION RELLENO FUNDACIONES DE PA00.30.003.0006 00.30.003.000

10.20.001.0003
PERNO SUMINISTRO Y COLOCACION 10.20.001.0003 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0003 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0003 10.20.001.000
10.20.001.0004
PERNO SUMINISTRO Y COLOCACION 10.20.001.0004 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0004 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0004 10.20.001.000
10.20.001.0103
PERNO SUMINISTRO Y COLOCACION 10.20.001.0103 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0103 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0103 10.20.001.010
10.20.001.0104
PERNO SUMINISTRO Y COLOCACION 10.20.001.0104 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0104 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0104 10.20.001.010
10.20.001.0008
PERNO SUMINISTRO Y COLOCACION 10.20.001.0008 10.20.001.000
PERNO LIMPIEZA PERNO 10.20.001.0008 10.20.001.000
PERNO PROTOCOLO PERNO 10.20.001.0008 10.20.001.000
10.20.001.0108
PERNO SUMINISTRO Y COLOCACION 10.20.001.0108 10.20.001.010
PERNO LIMPIEZA PERNO 10.20.001.0108 10.20.001.010
PERNO PROTOCOLO PERNO 10.20.001.0108 10.20.001.010
10.20.002.0001
PERNO SUMINISTRO Y COLOCACION 10.20.002.0001 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0001 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0001 10.20.002.000
10.20.002.0002
PERNO SUMINISTRO Y COLOCACION 10.20.002.0002 10.20.002.000
PERNO LIMPIEZA PERNO 10.20.002.0002 10.20.002.000
PERNO PROTOCOLO PERNO 10.20.002.0002 10.20.002.000
10.40.001.0008
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0008 10.40.001.000
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0008 10.40.001.000
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0008 10.40.001.000
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0008 10.40.001.000
10.40.001.0069
ACERO REFUERZO SUMINISTRO DE ACERO REFU 10.40.001.0069 10.40.001.006
ACERO REFUERZO CORTADO ACERO REFUERZO 10.40.001.0069 10.40.001.006
ACERO REFUERZO DOBLADO ACERO REFUERZO 10.40.001.0069 10.40.001.006
ACERO REFUERZO PUNCH LIST ACERO REFUERZO10.40.001.0069 10.40.001.006
10.40.002.2808
CONCRETO COLOCACION ACERO 10.40.002.2808 10.40.002.280
CONCRETO ENCOFRADO CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO VACIADO CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO DESCIMBRE CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO LIMPIEZA CONCRETO 10.40.002.2808 10.40.002.280
CONCRETO PUNCH LIST CONCRETO 10.40.002.2808 10.40.002.280
10.40.002.1564
CONCRETO COLOCACION ACERO 10.40.002.1564 10.40.002.156
CONCRETO ENCOFRADO CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO VACIADO CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO DESCIMBRE CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO LIMPIEZA CONCRETO 10.40.002.1564 10.40.002.156
CONCRETO PUNCH LIST CONCRETO 10.40.002.1564 10.40.002.156
10.40.002.1565
CONCRETO COLOCACION ACERO 10.40.002.1565 10.40.002.156
CONCRETO ENCOFRADO CONCRETO 10.40.002.1565 10.40.002.156
CONCRETO TOPOGRAFIA CONCRETO 10.40.002.1565 10.40.002.156
CONCRETO VACIADO CONCRETO 10.40.002.1565 10.40.002.156
CONCRETO DESCIMBRE CONCRETO 10.40.002.1565 10.40.002.156
CONCRETO LIMPIEZA CONCRETO 10.40.002.1565 10.40.002.156
CONCRETO PUNCH LIST CONCRETO 10.40.002.1565 10.40.002.156
10.60.002.1061
SOLADO ENCOFRADO CONCRETO 10.60.002.1061 10.60.002.1061
SOLADO VACIADO CONCRETO 10.60.002.1061 10.60.002.106
SOLADO DESCIMBRE CONCRETO 10.60.002.1061 10.60.002.1061
SOLADO LIMPIEZA CONCRETO 10.60.002.1061 10.60.002.106
SOLADO PUNCH LIST CONCRETO 10.60.002.1061 10.60.002.106

20.10.001.0003
ESTRUCTURA ACERO PRE-ARMADOESTRUCTURA AC20.10.001.0003 20.10.001.000
ESTRUCTURA ACERO MONTAJE ESTRUCTURA ACER 20.10.001.0003 20.10.001.000
ESTRUCTURA ACERO PUNCH LIST EST. ACERO 20.10.001.0003 20.10.001.000

40.60.001.1715
BOMBA SUMINISTRO BOMBA 40.60.001.1715 40.60.001.1715
BOMBA MONTAJE BOMBA 40.60.001.1715 40.60.001.1715
BOMBA CONEXIONADO BOMBA 40.60.001.1715 40.60.001.1715
BOMBA PROTOCOLO BOMBA 40.60.001.1715 40.60.001.1715
40.60.001.1716
MOTOR CONTROL CENTMOTOR CONTROL CENTER 40.60.001.1716 40.60.001.1716
MOTOR CONTROL CENTMONTAJE MOTOR CONTROL C40.60.001.1716 40.60.001.1716
MOTOR CONTROL CENTCONEXIONADO MOTOR CONTR40.60.001.1716 40.60.001.1716
MOTOR CONTROL CENTPROTOCOLOS MOTOR CONTRO40.60.001.1716 40.60.001.1716
40.60.001.1717
BOMBA SUMINISTRO BOMBA 40.60.001.1717 40.60.001.1717
BOMBA MONTAJE BOMBA 40.60.001.1717 40.60.001.1717
BOMBA CONEXIONADO BOMBA 40.60.001.1717 40.60.001.1717
BOMBA PROTOCOLO BOMBA 40.60.001.1717 40.60.001.1717
40.60.001.1718
MOTOR ELECTRICO RECEPCION MOTOR ELECTRIC 40.60.001.1718 40.60.001.1718
MOTOR ELECTRICO MONTAJE BOMBA 40.60.001.1718 40.60.001.1718
MOTOR ELECTRICO CONEXIONADO MOTOR ELECT40.60.001.1718 40.60.001.1718
MOTOR ELECTRICO PROTOCOLOS MOTOR ELECTRI40.60.001.1718 40.60.001.1718

60.20.001.0005
ESCALERILLA PORTAC SUMINISTRO ESCALERILLA 60.20.001.0005 60.20.001.000
ESCALERILLA PORTAC MONTAJE ESCALERILLA 60.20.001.0005 60.20.001.000
ESCALERILLA PORTAC PROTOCOLO ESCALERILLA 60.20.001.0005 60.20.001.000
60.20.002.0002
CONDUIT SUMINISTRO CONDUIT 60.20.002.0002 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0002 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0002 60.20.002.000
60.20.002.0004
CONDUIT SUMINISTRO CONDUIT 60.20.002.0004 60.20.002.000
CONDUIT MONTAJE CONDUIT 60.20.002.0004 60.20.002.000
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0004 60.20.002.000
60.20.002.0032
CONDUIT SUMINISTRO CONDUIT 60.20.002.0032 60.20.002.003
CONDUIT MONTAJE CONDUIT 60.20.002.0032 60.20.002.003
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0032 60.20.002.003
60.20.002.0043
CONDUIT SUMINISTRO CONDUIT 60.20.002.0043 60.20.002.004
CONDUIT MONTAJE CONDUIT 60.20.002.0043 60.20.002.004
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0043 60.20.002.004
60.20.002.0057
CONDUIT SUMINISTRO CONDUIT 60.20.002.0057 60.20.002.005
CONDUIT MONTAJE CONDUIT 60.20.002.0057 60.20.002.005
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0057 60.20.002.005
60.20.002.0058
CONDUIT SUMINISTRO CONDUIT 60.20.002.0058 60.20.002.005
CONDUIT MONTAJE CONDUIT 60.20.002.0058 60.20.002.005
CONDUIT PROTOCOLOS CONDUIT 60.20.002.0058 60.20.002.005
60.30.001.6314
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.6314 60.30.001.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.6314 60.30.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.6314 60.30.001.631
60.30.001.9113
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.001.9113 60.30.001.911
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.001.9113 60.30.001.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.001.9113 60.30.001.911
60.30.002.6312
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6312 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6312 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6312 60.30.002.631
60.30.002.6314
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6314 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6314 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6314 60.30.002.631
60.30.002.6315
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.6315 60.30.002.631
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.6315 60.30.002.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.6315 60.30.002.631
60.30.002.7021
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7021 60.30.002.702
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7021 60.30.002.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7021 60.30.002.702
60.30.002.7022
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7022 60.30.002.702
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7022 60.30.002.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7022 60.30.002.702
60.30.002.7331
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.7331 60.30.002.733
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.7331 60.30.002.733
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.7331 60.30.002.733
60.30.002.8101
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8101 60.30.002.810
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8101 60.30.002.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8101 60.30.002.810
60.30.002.8102
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.8102 60.30.002.810
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.8102 60.30.002.810
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.8102 60.30.002.810
60.30.002.9114
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.30.002.9114 60.30.002.911
CABLE FUERZA, CONTR TENDIDO CABLE 60.30.002.9114 60.30.002.911
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.30.002.9114 60.30.002.911
60.40.001.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0001 60.40.001.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0001 60.40.001.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0001 60.40.001.000
60.40.001.0002
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.001.0002 60.40.001.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.001.0002 60.40.001.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.001.0002 60.40.001.000
60.40.002.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0001 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0001 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0001 60.40.002.000
60.40.002.0002
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0002 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0002 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0002 60.40.002.000
60.40.002.0003
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.002.0003 60.40.002.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.002.0003 60.40.002.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.002.0003 60.40.002.000
60.40.005.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.005.0001 60.40.005.000
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.005.0001 60.40.005.000
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.005.0001 60.40.005.000
60.40.003.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.003.0001 60.40.003.0001
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.003.0001 60.40.003.0001
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.003.0001 60.40.003.0001
60.40.004.0001
CABLE DESNUDO PUESTSUMINISTRO CABLE 60.40.004.0001 60.40.004.0001
CABLE DESNUDO PUESTMONTAJE CABLE 60.40.004.0001 60.40.004.0001
CABLE DESNUDO PUESTPROTOCOLOS CABLE 60.40.004.0001 60.40.004.0001
60.40.006.0004
PARARRAYOS SUMINISTRO PARARRAYOS 60.40.006.0004 60.40.006.0004
PARARRAYOS MONTAJE PARARRAYOS 60.40.006.0004 60.40.006.0004
PARARRAYOS PROTOCOLO PARARRAYOS 60.40.006.0004 60.40.006.0004
60.40.006.0005
PARARRAYOS SUMINISTRO PARARRAYOS 60.40.006.0005 60.40.006.0005
PARARRAYOS MONTAJE PARARRAYOS 60.40.006.0005 60.40.006.0005
60.40.006.0006
PARARRAYOS SUMINISTRO PARARRAYOS 60.40.006.0006 60.40.006.0006
PARARRAYOS MONTAJE PARARRAYOS 60.40.006.0006 60.40.006.0006
60.50.001.6315
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.6315 60.50.001.631
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.6315 60.50.001.631
60.50.001.7021
CABLE FUERZA, CONTR SUMINISTRO CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR INSTALACION MUFAS CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR CONEXIONADO CABLE 60.50.001.7021 60.50.001.702
CABLE FUERZA, CONTR PROTOCOLOS CABLE 60.50.001.7021 60.50.001.702
60.60.005.0071
PROYECTOR LED SUMINISTRO PROYECTOR LED60.60.005.0071 60.60.005.0071
PROYECTOR LED MONTAJE PROYECTOR LED 60.60.005.0071 60.60.005.0071
PROYECTOR LED PROTOCOLO PROYECTOR LED 60.60.005.0071 60.60.005.007

70.20.001.0010
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0010 70.20.001.0010
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0010 70.20.001.0010
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0010 70.20.001.0010
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0010 70.20.001.0010
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0010 70.20.001.0010
70.20.001.0016
INDICADOR RECEPCION INDICADOR 70.20.001.0016 70.20.001.0016
INDICADOR MONTAJE INDICADOR 70.20.001.0016 70.20.001.0016
INDICADOR CONEXIONADO INDICADOR 70.20.001.0016 70.20.001.0016
INDICADOR CONTRASTACION INDICADOR 70.20.001.0016 70.20.001.0016
INDICADOR PROTOCOLOS INDICADOR 70.20.001.0016 70.20.001.0016
70.20.001.0029
TRANSMISOR RECEPCION TRANSMISOR 70.20.001.0029 70.20.001.0029
TRANSMISOR MONTAJE TRANSMISOR 70.20.001.0029 70.20.001.0029
TRANSMISOR CONEXIONADO TRANSMISOR70.20.001.0029 70.20.001.0029
TRANSMISOR CONTRASTACION TRANSMISO70.20.001.0029 70.20.001.0029
TRANSMISOR PROTOCOLOS TRANSMISOR 70.20.001.0029 70.20.001.0029
70.20.001.0030
INTERRUPTOR RECEPCION INTERRUPTOR 70.20.001.0030 70.20.001.0030
INTERRUPTOR MONTAJE INTERRUPTOR 70.20.001.0030 70.20.001.0030
INTERRUPTOR CONEXIONADO INTERRUPTOR70.20.001.0030 70.20.001.0030
INTERRUPTOR CONTRASTACION INTERRUPT 70.20.001.0030 70.20.001.0030
INTERRUPTOR PROTOCOLOS INTERRUPTOR 70.20.001.0030 70.20.001.0030
70.20.001.0036
INDICADOR RECEPCION INDICADOR 70.20.001.0036 70.20.001.0036
INDICADOR MONTAJE INDICADOR 70.20.001.0036 70.20.001.0036
INDICADOR CONEXIONADO INDICADOR 70.20.001.0036 70.20.001.0036
INDICADOR CONTRASTACION INDICADOR 70.20.001.0036 70.20.001.0036
INDICADOR PROTOCOLOS INDICADOR 70.20.001.0036 70.20.001.0036
70.20.001.0038
SIRENA RECEPCION SIRENA 70.20.001.0038 70.20.001.0038
SIRENA MONTAJE SIRENA 70.20.001.0038 70.20.001.0038
SIRENA CONEXIONADO SIRENA 70.20.001.0038 70.20.001.0038
SIRENA CONTRASTACION SIRENA 70.20.001.0038 70.20.001.0038
SIRENA PROTOCOLOS SIRENA 70.20.001.0038 70.20.001.0038
70.20.001.0039
BALIZA RECEPCION BALIZA 70.20.001.0039 70.20.001.0039
BALIZA MONTAJE BALIZA 70.20.001.0039 70.20.001.0039
BALIZA CONEXIONADO BALIZA 70.20.001.0039 70.20.001.0039
BALIZA CONTRASTACION BALIZA 70.20.001.0039 70.20.001.0039
BALIZA PROTOCOLO BALIZA 70.20.001.0039 70.20.001.0039
70.50.001.0005
GABINETE COMUNICACRECEPCION INSTRUMENTOS 70.50.001.0005 70.50.001.0005
GABINETE COMUNICACMONTAJE INSTRUMENTOS 70.50.001.0005 70.50.001.0005
GABINETE COMUNICACCONEXIONADO INSTRUMENTO70.50.001.0005 70.50.001.0005
GABINETE COMUNICACCONTRASTACION INSTRUMEN70.50.001.0005 70.50.001.0005
GABINETE COMUNICACPROTOCOLOS INSTRUMENTOS70.50.001.0005 70.50.001.0005
70.60.001.0002
CAMARA CCTV RECEPCION INSTRUMENTOS 70.60.001.0002 70.60.001.0002
CAMARA CCTV MONTAJE INSTRUMENTOS 70.60.001.0002 70.60.001.0002
CAMARA CCTV CONEXIONADO INSTRUMENTO70.60.001.0002 70.60.001.0002
CAMARA CCTV CONTRASTACION INSTRUMEN70.60.001.0002 70.60.001.0002
CAMARA CCTV PROTOCOLOS INSTRUMENTOS70.60.001.0002 70.60.001.0002
70.60.001.0003
GABINETE CCTV RECEPCION INSTRUMENTOS 70.60.001.0003 70.60.001.0003
GABINETE CCTV MONTAJE INSTRUMENTOS 70.60.001.0003 70.60.001.0003
GABINETE CCTV CONEXIONADO INSTRUMENTO70.60.001.0003 70.60.001.0003
GABINETE CCTV CONTRASTACION INSTRUMEN70.60.001.0003 70.60.001.0003
GABINETE CCTV PROTOCOLOS INSTRUMENTOS70.60.001.0003 70.60.001.0003

51.20.001.0001
FABRICACION DE TUBERFABRICACION DE TUBERIAS R51.20.001.0001 51.20.001.000
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0001 51.20.001.000
51.20.001.0002
FABRICACION DE TUBERFABRICACION DE TUBERIAS R51.20.001.0002 51.20.001.000
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0002 51.20.001.000
51.20.001.0007
INSTALACION DE TUBERFABRICACION DE TUBERIAS R51.20.001.0007 51.20.001.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0007 51.20.001.000
51.20.001.0008
INSTALACION DE TUBERFABRICACION DE TUBERIAS R51.20.001.0008 51.20.001.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.001.0008 51.20.001.000
51.20.002.0009
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0009 51.20.002.0009
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0009 51.20.002.0009
51.20.002.0010
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0010 51.20.002.0010
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0010 51.20.002.0010
51.20.002.0020
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0020 51.20.002.0020
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0020 51.20.002.0020
51.20.002.0025
INSTALACION DE TUBERFABRICACION DE TUBERIAS A51.20.002.0025 51.20.002.0025
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.20.002.0025 51.20.002.0025
51.30.001.0009
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0009 51.30.001.000
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0009 51.30.001.0009
51.30.001.0011
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0011 51.30.001.0011
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0011 51.30.001.0011
51.30.001.0012
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0012 51.30.001.001
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0012 51.30.001.0012
51.30.001.0013
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0013 51.30.001.001
FABRICACION DE TUBERFABRICACION DE TUBERIAS 51.30.001.0013 51.30.001.0013
51.40.001.0007
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0007 51.40.001.0007
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.001.0007 51.40.001.0007
51.40.007.0001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0001 51.40.007.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0001 51.40.007.000
51.40.007.0002
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0002 51.40.007.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0002 51.40.007.000
51.40.007.0008
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0008 51.40.007.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0008 51.40.007.000
51.40.007.0009
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0009 51.40.007.000
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0009 51.40.007.000
51.40.007.0010
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0010 51.40.007.001
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.40.007.0010 51.40.007.001
51.60.101.0004
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0004 51.60.101.0004
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0004 51.60.101.0004
51.60.101.0005
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0005 51.60.101.0005
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0005 51.60.101.0005
51.60.101.0008
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0008 51.60.101.0008
INSTALACION DE TUBERFABRICACION DE TUBERIAS 51.60.101.0008 51.60.101.0008
52.20.001.0001
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0001 52.20.001.0001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0001 52.20.001.0001
52.20.001.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0002 52.20.001.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0002 52.20.001.0002
52.20.001.0008
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0008 52.20.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0008 52.20.001.000
52.20.001.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0009 52.20.001.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0009 52.20.001.0009
52.20.001.0010
INSTALACION DE TUBERMONTAJE DE TUBERIAS SPOO52.20.001.0010 52.20.001.0010
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.001.0010 52.20.001.0010
52.20.003.0008
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0008 52.20.003.0008
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0008 52.20.003.0008
52.20.003.0014
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0014 52.20.003.0014
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0014 52.20.003.0014
52.20.003.0016
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0016 52.20.003.0016
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0016 52.20.003.0016
52.20.003.0022
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0022 52.20.003.002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0022 52.20.003.002
52.20.003.0023
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0023 52.20.003.0023
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0023 52.20.003.0023
52.20.003.0024
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0024 52.20.003.0024
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0024 52.20.003.0024
52.20.003.0026
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0026 52.20.003.0026
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0026 52.20.003.0026
52.20.003.0031
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0031 52.20.003.0031
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0031 52.20.003.0031
52.20.003.0032
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0032 52.20.003.003
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0032 52.20.003.0032
52.20.003.0033
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0033 52.20.003.0033
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0033 52.20.003.0033
52.20.003.0034
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0034 52.20.003.0034
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0034 52.20.003.0034
52.20.003.0036
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0036 52.20.003.003
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0036 52.20.003.003
52.20.003.0037
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0037 52.20.003.0037
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0037 52.20.003.0037
52.20.003.0038
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0038 52.20.003.0038
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0038 52.20.003.0038
52.20.003.0043
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0043 52.20.003.0043
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0043 52.20.003.0043
52.20.003.0049
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0049 52.20.003.0049
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0049 52.20.003.0049
52.20.003.0051
INSTALACION DE TUBERMONTAJE DE TUBERIAS ELEM52.20.003.0051 52.20.003.0051
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.20.003.0051 52.20.003.0051
52.30.001.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0009 52.30.001.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0009 52.30.001.0009
52.30.001.0011
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0011 52.30.001.0011
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0011 52.30.001.0011
52.30.001.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0012 52.30.001.0012
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0012 52.30.001.0012
52.30.001.0013
INSTALACION DE TUBERMONTAJE DE TUBERIAS SOL 52.30.001.0013 52.30.001.0013
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.30.001.0013 52.30.001.0013
52.40.006.0001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0001 52.40.006.0001
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0001 52.40.006.0001
52.40.006.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0002 52.40.006.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0002 52.40.006.0002
52.40.006.0008
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0008 52.40.006.000
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0008 52.40.006.000
52.40.006.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0009 52.40.006.0009
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0009 52.40.006.0009
52.40.006.0010
INSTALACION DE TUBERMONTAJE DE TUBERIAS PRUE52.40.006.0010 52.40.006.0010
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.40.006.0010 52.40.006.0010
52.80.004.0002
INSTALACION DE TUBERMONTAJE DE MISCELANEOS 52.80.004.0002 52.80.004.0002
INSTALACION DE TUBERMONTAJE DE TUBERIAS PROT52.80.004.0002 52.80.004.0002
70.20.008.0009
SOPORTE INSTALACIONRECEPCION CAMARA CCTV 70.20.008.0009 70.20.008.0009
SOPORTE INSTALACIONMONTAJE CAMARA CCTV 70.20.008.0009 70.20.008.0009
SOPORTE INSTALACIONCONEXIONADO CAMARA CCT70.20.008.0009 70.20.008.0009
SOPORTE INSTALACIONCONTRASTACION CAMARA CC70.20.008.0009 70.20.008.0009
SOPORTE INSTALACIONPROTOCOLOS CAMARA CCTV 70.20.008.0009 70.20.008.0009

83.10.002.1001
PREENSAMBLE BLDG-STA
RECEPCION 83.10.002.1001 83.10.002.1001
PREENSAMBLE BLDG-STA
PRE-ARMADO 83.10.002.1001 83.10.002.1001
PREENSAMBLE BLDG-STA
DESPACHO 83.10.002.1001 83.10.002.1001
83.10.002.1002
PREENSAMBLE BLDG-STA
RECEPCION 83.10.002.1002 83.10.002.1002
PREENSAMBLE BLDG-STA
PRE-ARMADO 83.10.002.1002 83.10.002.1002
PREENSAMBLE BLDG-STA
DESPACHO 83.10.002.1002 83.10.002.1002

83.10.006.1001
PREENSAMBLE DATA C RECEPCION 83.10.006.1001 83.10.006.1001
PREENSAMBLE DATA C PRE-ARMADO 83.10.006.1001 83.10.006.1001
PREENSAMBLE DATA C DESPACHO 83.10.006.1001 83.10.006.1001

83.10.006.1002
PREENSAMBLE CONTRORECEPCION 83.10.006.1002 83.10.006.1002
PREENSAMBLE CONTROPRE-ARMADO 83.10.006.1002 83.10.006.1002
PREENSAMBLE CONTRODESPACHO 83.10.006.1002 83.10.006.1002

83.10.003.1002
PREENSAMBLE IMPACT RECEPCION 83.10.003.1002 83.10.003.1002
PREENSAMBLE IMPACT PRE-ARMADO 83.10.003.1002 83.10.003.1002
PREENSAMBLE IMPACT DESPACHO 83.10.003.1002 83.10.003.1002
83.10.003.2002
PREENSAMBLE LOAD TARECEPCION 83.10.003.2002 83.10.003.200
PREENSAMBLE LOAD TAPRE-ARMADO 83.10.003.2002 83.10.003.200
PREENSAMBLE LOAD TADESPACHO 83.10.003.2002 83.10.003.200
83.10.003.3002
PREENSAMBLE GALERIERECEPCION 83.10.003.3002 83.10.003.3002
PREENSAMBLE GALERIEPRE-ARMADO 83.10.003.3002 83.10.003.300
PREENSAMBLE GALERIEDESPACHO 83.10.003.3002 83.10.003.3002
83.10.003.5001
PREENSAMBLE GALERIERECEPCION 83.10.003.5001 83.10.003.5001
PREENSAMBLE GALERIEPRE-ARMADO 83.10.003.5001 83.10.003.5001
PREENSAMBLE GALERIEDESPACHO 83.10.003.5001 83.10.003.5001
83.10.003.6002
PREENSAMBLE GALERIERECEPCION 83.10.003.6002 83.10.003.6002
PREENSAMBLE GALERIEPRE-ARMADO 83.10.003.6002 83.10.003.6002
PREENSAMBLE GALERIEDESPACHO 83.10.003.6002 83.10.003.6002
83.10.003.7002
PREENSAMBLE GALERIERECEPCION 83.10.003.7002 83.10.003.7002
PREENSAMBLE GALERIEPRE-ARMADO 83.10.003.7002 83.10.003.7002
PREENSAMBLE GALERIEDESPACHO 83.10.003.7002 83.10.003.7002
83.10.003.8002
83.10.003.9001

83.10.003.1001
PREENSAMBLE IMPACT RECEPCION 83.10.003.1001 83.10.003.1001
PREENSAMBLE IMPACT PRE-ARMADO 83.10.003.1001 83.10.003.1001
PREENSAMBLE IMPACT DESPACHO 83.10.003.1001 83.10.003.1001
83.10.003.2001
PREENSAMBLE LOAD TARECEPCION 83.10.003.2001 83.10.003.200
PREENSAMBLE LOAD TAPRE-ARMADO 83.10.003.2001 83.10.003.200
PREENSAMBLE LOAD TADESPACHO 83.10.003.2001 83.10.003.200
83.10.003.3001
PREENSAMBLE GALERIERECEPCION 83.10.003.3001 83.10.003.3001
PREENSAMBLE GALERIEPRE-ARMADO 83.10.003.3001 83.10.003.3001
PREENSAMBLE GALERIEDESPACHO 83.10.003.3001 83.10.003.3001
83.10.003.5001
PREENSAMBLE GALERIERECEPCION 83.10.003.5001 83.10.003.500
PREENSAMBLE GALERIEPRE-ARMADO 83.10.003.5001 83.10.003.500
PREENSAMBLE GALERIEDESPACHO 83.10.003.5001 83.10.003.500
83.10.003.6001
PREENSAMBLE GALERIERECEPCION 83.10.003.6001 83.10.003.6001
PREENSAMBLE GALERIEPRE-ARMADO 83.10.003.6001 83.10.003.6001
PREENSAMBLE GALERIEDESPACHO 83.10.003.6001 83.10.003.6001
83.10.003.7001
PREENSAMBLE GALERIERECEPCION 83.10.003.7001 83.10.003.7001
PREENSAMBLE GALERIEPRE-ARMADO 83.10.003.7001 83.10.003.7001
PREENSAMBLE GALERIEDESPACHO 83.10.003.7001 83.10.003.7001
83.10.003.8001
PREENSAMBLE GALERIERECEPCION 83.10.003.8001 83.10.003.8001
PREENSAMBLE GALERIEPRE-ARMADO 83.10.003.8001 83.10.003.8001
PREENSAMBLE GALERIEDESPACHO 83.10.003.8001 83.10.003.8001
83.10.003.9001
PREENSAMBLE GALERIERECEPCION 83.10.003.9001 83.10.003.9001
PREENSAMBLE GALERIEPRE-ARMADO 83.10.003.9001 83.10.003.9001
PREENSAMBLE GALERIEDESPACHO 83.10.003.9001 83.10.003.9001

83.10.006.1006
PREENSAMBLE POTABLRECEPCION 83.10.006.1006 83.10.006.1006
PREENSAMBLE POTABLPRE-ARMADO 83.10.006.1006 83.10.006.1006
PREENSAMBLE POTABLDESPACHO 83.10.006.1006 83.10.006.1006

83.10.006.1003
PREENSAMBLE SEWAGERECEPCION 83.10.006.1003 83.10.006.1003
PREENSAMBLE SEWAGEPRE-ARMADO 83.10.006.1003 83.10.006.1003
PREENSAMBLE SEWAGEDESPACHO 83.10.006.1003 83.10.006.1003
83.10.006.1004
PREENSAMBLE SEWAGERECEPCION 83.10.006.1004 83.10.006.1004
PREENSAMBLE SEWAGEPRE-ARMADO 83.10.006.1004 83.10.006.1004
PREENSAMBLE SEWAGEDESPACHO 83.10.006.1004 83.10.006.1004
83.10.006.1005
PREENSAMBLE SEWAGERECEPCION 83.10.006.1005 83.10.006.1005
PREENSAMBLE SEWAGEPRE-ARMADO 83.10.006.1005 83.10.006.1005
PREENSAMBLE SEWAGEDESPACHO 83.10.006.1005 83.10.006.1005
00.20.003.000148INTERRUPTOR 10 CIVIL

0.00

21,840,387.90 12,306,143.39 1,757,644.38 3,864,396.12 $37,811,456.94


8

Evalúa Evalúa X Base d Horas Hombre Cantidades Costo 00.01.0001

1,863.93 1.00 180,000.00

16,136.07 1.00 1,558,265.10

20.003.0001
20.003.0001
30.004.0002
30.004.0002
30.007.0001
30.007.0001
40.002.0001
40.002.0001
40.007.0001
40.007.0001

20.002.0004
20.002.0004
20.002.0004
20.002.0004
20.002.0007
20.002.0007
20.002.0007
20.002.0007
20.002.0043
20.002.0043
20.002.0043
20.002.0043
20.002.0044
20.002.0044
20.002.0044
20.002.0044
20.002.0058
20.002.0058
20.002.0058
20.002.0058
30.001.6505
30.001.6505
30.001.6505
30.001.6505
30.001.6512
30.001.6512
30.001.6512
30.001.6512
30.001.6513
30.001.6513
30.001.6513
30.001.6513
30.001.6514
30.001.6514
30.001.6514
30.001.6514
30.001.9113
30.001.9113
30.001.9113
30.001.9113
30.001.9114
30.001.9114
30.001.9114
30.001.9114
40.001.0001
40.001.0001
40.001.0001
40.001.0001
40.002.0001
40.002.0001
40.002.0001
40.002.0001
40.006.0001
40.006.0001
40.006.0001
40.006.0001
40.006.0004
40.006.0004
40.006.0004
40.006.0004
40.006.0005
40.006.0005
40.006.0005
40.006.0005
50.001.6505
50.001.6505
50.001.6505
50.001.6505
50.001.6505
50.001.6512
50.001.6512
50.001.6512
50.001.6512
50.001.6512
50.001.6513
50.001.6513
50.001.6513
50.001.6513
50.001.6513
50.001.6514
50.001.6514
50.001.6514
50.001.6514
50.001.6514
50.001.9113
50.001.9113
50.001.9113
50.001.9113
50.001.9113
50.001.9114
50.001.9114
50.001.9114
50.001.9114
50.001.9114
60.005.0073
60.005.0073
60.005.0073
60.005.0073
60.005.0202
60.005.0202
60.005.0202
60.005.0202
60.005.0203
60.005.0203
60.005.0203
60.005.0203

30.007.0001
30.007.0001
40.002.0001
40.002.0001

60.001.1711
330.00 33.00 33.00 0.10 50
330.00 198.00 198.00 0.60 300
330.00 66.00 66.00 0.20 100
330.00 33.00 33.00 0.10 50
60.001.1712
198.00 19.80 19.80 0.10 50
198.00 118.80 118.80 0.60 300
198.00 39.60 39.60 0.20 100
198.00 19.80 19.80 0.10 50
60.001.1713
330.00 33.00 33.00 0.10 50
330.00 198.00 198.00 0.60 300
330.00 66.00 66.00 0.20 100
330.00 33.00 33.00 0.10 50
60.001.1714
198.00 19.80 19.80 0.10 50
198.00 118.80 118.80 0.60 300
198.00 39.60 39.60 0.20 100
198.00 19.80 19.80 0.10 50

20.003.0001
35,311.68 35,311.68 964.80 4,824.00 35311.68 0.00
25.001.0001
0.00 0.00 0.00 0.00 0 0.02
25.002.0002
0.00 0.00 0.00 0.00 0 0.00
30.001.0007
14,448.15 14,448.15 826.44 291.00 14448.15 0.04
30.002.0001
0.00 0.00 0.00 0.00 0 0.13
30.002.0002
0.00 0.00 0.00 0.00 0 0.13
20.001.0001
0.00 0.00 0.00 70.00 0
0.00 0.00 0.00 14.00 0
0.00 0.00 0.00 56.00 0
20.001.0002
51.35 25.68 25.68 70.00 296.8
51.35 5.14 5.14 14.00 59.36
51.35 20.54 20.54 56.00 237.44
20.001.0101
0.00 0.00 0.00 70.00 0
0.00 0.00 0.00 14.00 0
0.00 0.00 0.00 56.00 0
20.001.0102
53.68 26.84 26.84 70.00 310.8
53.68 5.37 5.37 14.00 62.16
53.68 21.47 21.47 56.00 248.64
20.001.0003
0.00 0.00 0.00 505.00 0
0.00 0.00 0.00 101.00 0
0.00 0.00 0.00 404.00 0
20.001.0004
317.54 158.77 158.77 505.00 1843.25
317.54 31.75 31.75 101.00 368.65
317.54 127.02 127.02 404.00 1474.6
20.001.0103
0.00 0.00 0.00 505.00 0
0.00 0.00 0.00 101.00 0
0.00 0.00 0.00 404.00 0
20.001.0104
331.99 165.99 165.99 505.00 1929.1
331.99 33.20 33.20 101.00 385.82
331.99 132.79 132.79 404.00 1543.28
20.001.2018
349.24 174.62 174.62 667.00 2034.35
349.24 34.92 34.92 133.40 406.87
349.24 139.70 139.70 533.60 1627.48
20.002.0001
0.00 0.00 0.00 7,350.00 0
0.00 0.00 0.00 1,470.00 0
0.00 0.00 0.00 5,880.00 0
20.002.0002
4,621.68 2,310.84 2,310.84 7,350.00 26827.5
4,621.68 462.17 462.17 1,470.00 5365.5
4,621.68 1,848.67 1,848.67 5,880.00 21462
20.002.0202
9,922.22 4,961.11 4,961.11 18,950.00 72389
9,922.22 992.22 992.22 3,790.00 14477.8
9,922.22 3,968.89 3,968.89 15,160.00 57911.2
30.001.0001
0.00 0.00 0.00 350.00 0
30.001.0002
98.67 9.87 9.87 35.00 97.3
98.67 39.47 39.47 140.00 389.2
98.67 49.33 49.33 175.00 486.5
30.001.0003
0.00 0.00 0.00 350.00 0
30.001.0004
98.67 9.87 9.87 35.00 97.3
98.67 39.47 39.47 140.00 389.2
98.67 49.33 49.33 175.00 486.5
40.001.0001
180.65 54.20 54.20 764.40 1414.14
180.65 27.10 27.10 382.20 707.07
180.65 27.10 27.10 382.20 707.07
180.65 72.26 72.26 1,019.20 1885.52
40.001.0002
3.50 1.05 1.05 14.82 27.416999656
3.50 0.53 0.53 7.41 13.708499828
3.50 0.53 0.53 7.41 13.708499828
3.50 1.40 1.40 19.76 36.5559995413
40.001.0003
13.10 3.93 3.93 55.44 102.564
13.10 1.97 1.97 27.72 51.282
13.10 1.97 1.97 27.72 51.282
13.10 5.24 5.24 73.92 136.752
40.001.0005
566.85 170.05 170.05 2,398.50 4437.22494495
566.85 85.03 85.03 1,199.25 2218.61247248
566.85 85.03 85.03 1,199.25 2218.61247248
566.85 226.74 226.74 3,198.00 5916.29992661
40.001.0006
6,203.20 1,860.96 1,860.96 26,247.66 48558.1709894
6,203.20 930.48 930.48 13,123.83 24279.0854947
6,203.20 930.48 930.48 13,123.83 24279.0854947
6,203.20 2,481.28 2,481.28 34,996.88 64744.2279859
40.001.0007
14,040.69 4,212.21 4,212.21 60,174.39 117340.05465
14,040.69 2,106.10 2,106.10 30,087.19 58670.027325
14,040.69 2,106.10 2,106.10 30,087.19 58670.027325
14,040.69 5,616.28 5,616.28 80,232.52 156453.4062
40.001.0009
41.31 12.39 12.39 174.78 323.343
41.31 6.20 6.20 87.39 161.6715
41.31 6.20 6.20 87.39 161.6715
41.31 16.52 16.52 233.04 431.124
40.001.0010
148.04 44.41 44.41 626.40 1158.84
148.04 22.21 22.21 313.20 579.42
148.04 22.21 22.21 313.20 579.42
148.04 59.22 59.22 835.20 1545.12
40.001.0020
193.12 57.94 57.94 817.15 1511.7312
193.12 28.97 28.97 408.58 755.8656
193.12 28.97 28.97 408.58 755.8656
193.12 77.25 77.25 1,089.54 2015.6416
40.001.0021
3,821.39 1,146.42 1,146.42 16,169.47 29913.5232
3,821.39 573.21 573.21 8,084.74 14956.7616
3,821.39 573.21 573.21 8,084.74 14956.7616
3,821.39 1,528.55 1,528.55 21,559.30 39884.6976
40.001.0022
6,005.67 1,801.70 1,801.70 25,411.86 47011.941
6,005.67 900.85 900.85 12,705.93 23505.9705
6,005.67 900.85 900.85 12,705.93 23505.9705
6,005.67 2,402.27 2,402.27 33,882.48 62682.588
40.001.0023
15,732.84 4,719.85 4,719.85 66,570.57 123155.5545
15,732.84 2,359.93 2,359.93 33,285.29 61577.77725
15,732.84 2,359.93 2,359.93 33,285.29 61577.77725
15,732.84 6,293.14 6,293.14 88,760.76 164207.406
40.001.0026
226.65 68.00 68.00 959.04 1774.224
226.65 34.00 34.00 479.52 887.112
226.65 34.00 34.00 479.52 887.112
226.65 90.66 90.66 1,278.72 2365.632
40.001.0027
25,374.59 7,612.38 7,612.38 107,367.80 198630.4374
25,374.59 3,806.19 3,806.19 53,683.90 99315.2187
25,374.59 3,806.19 3,806.19 53,683.90 99315.2187
25,374.59 10,149.84 10,149.84 143,157.07 264840.5832
40.001.0028
34,362.29 10,308.69 10,308.69 145,397.57 268985.49525
34,362.29 5,154.34 5,154.34 72,698.78 134492.747625
34,362.29 5,154.34 5,154.34 72,698.78 134492.747625
34,362.29 13,744.92 13,744.92 193,863.42 358647.327
40.002.2801
314.52 31.45 31.45 1.96 720.1628
314.52 62.90 62.90 3.92 1440.3256
314.52 141.53 141.53 8.82 3240.7326
314.52 31.45 31.45 1.96 720.1628
314.52 15.73 15.73 0.98 360.0814
314.52 31.45 31.45 1.96 720.1628
40.002.2802
1.35 0.14 0.14 0.04 8.26233989632
1.35 0.27 0.27 0.08 16.5246797926
1.35 0.61 0.61 0.17 37.1805295334
1.35 0.14 0.14 0.04 8.26233989632
1.35 0.07 0.07 0.02 4.13116994816
1.35 0.14 0.14 0.04 8.26233989632
40.002.2803
20.52 2.05 2.05 0.17 52.5336
20.52 4.10 4.10 0.34 105.0672
20.52 9.23 9.23 0.76 236.4012
20.52 2.05 2.05 0.17 52.5336
20.52 1.03 1.03 0.08 26.2668
20.52 2.05 2.05 0.17 52.5336
40.002.3507
5,224.75 522.48 522.48 250.00 53705
5,224.75 1,044.95 1,044.95 500.00 107410
5,224.75 2,351.14 2,351.14 1,125.00 241672.5
5,224.75 522.48 522.48 250.00 53705
5,224.75 261.24 261.24 125.00 26852.5
5,224.75 522.48 522.48 250.00 53705
40.002.3509
192.76 19.28 19.28 0.86 374.10516
192.76 38.55 38.55 1.72 748.21032
192.76 19.28 19.28 0.86 374.10516
192.76 67.46 67.46 3.00 1309.36806
192.76 19.28 19.28 0.86 374.10516
192.76 9.64 9.64 0.43 187.05258
192.76 19.28 19.28 0.86 374.10516
40.002.3510
396.18 39.62 39.62 3.60 1197.0686
396.18 79.24 79.24 7.21 2394.1372
396.18 39.62 39.62 3.60 1197.0686
396.18 138.66 138.66 12.61 4189.7401
396.18 39.62 39.62 3.60 1197.0686
396.18 19.81 19.81 1.80 598.5343
396.18 39.62 39.62 3.60 1197.0686
40.002.3520
1,517.13 151.71 151.71 8.04 3402.87079
1,517.13 303.43 303.43 16.08 6805.74158
1,517.13 151.71 151.71 8.04 3402.87079
1,517.13 530.99 530.99 28.14 11910.047765
1,517.13 151.71 151.71 8.04 3402.87079
1,517.13 75.86 75.86 4.02 1701.435395
1,517.13 151.71 151.71 8.04 3402.87079
40.002.3521
547.30 54.73 54.73 2.90 1633.396
547.30 109.46 109.46 5.80 3266.792
547.30 54.73 54.73 2.90 1633.396
547.30 191.55 191.55 10.15 5716.886
547.30 54.73 54.73 2.90 1633.396
547.30 27.36 27.36 1.45 816.698
547.30 54.73 54.73 2.90 1633.396
40.002.3522
4,624.08 462.41 462.41 45.61 22849.2417
4,624.08 924.82 924.82 91.22 45698.4834
4,624.08 462.41 462.41 45.61 22849.2417
4,624.08 1,618.43 1,618.43 159.64 79972.34595
4,624.08 462.41 462.41 45.61 22849.2417
4,624.08 231.20 231.20 22.81 11424.62085
4,624.08 462.41 462.41 45.61 22849.2417
40.002.3523
14,082.38 1,408.24 1,408.24 187.73 70338.68025
14,082.38 2,816.48 2,816.48 375.45 140677.3605
14,082.38 1,408.24 1,408.24 187.73 70338.68025
14,082.38 4,928.83 4,928.83 657.04 246185.380875
14,082.38 1,408.24 1,408.24 187.73 70338.68025
14,082.38 704.12 704.12 93.86 35169.340125
14,082.38 1,408.24 1,408.24 187.73 70338.68025
40.002.3526
248.58 24.86 24.86 0.92 488.33822
248.58 49.72 49.72 1.84 976.67644
248.58 24.86 24.86 0.92 488.33822
248.58 87.00 87.00 3.22 1709.18377
248.58 24.86 24.86 0.92 488.33822
248.58 12.43 12.43 0.46 244.16911
248.58 24.86 24.86 0.92 488.33822
40.002.3527
34,874.99 3,487.50 3,487.50 328.30 110140.36053
34,874.99 6,975.00 6,975.00 656.59 220280.72106
34,874.99 3,487.50 3,487.50 328.30 110140.36053
34,874.99 12,206.25 12,206.25 1,149.04 385491.261855
34,874.99 3,487.50 3,487.50 328.30 110140.36053
34,874.99 1,743.75 1,743.75 164.15 55070.180265
34,874.99 3,487.50 3,487.50 328.30 110140.36053
40.002.3528
28,289.79 2,828.98 2,828.98 321.16 100802.80307
28,289.79 5,657.96 5,657.96 642.32 201605.60614
28,289.79 2,828.98 2,828.98 321.16 100802.80307
28,289.79 9,901.43 9,901.43 1,124.06 352809.810745
28,289.79 2,828.98 2,828.98 321.16 100802.80307
28,289.79 1,414.49 1,414.49 160.58 50401.401535
28,289.79 2,828.98 2,828.98 321.16 100802.80307
40.002.3540
2,479.04 247.90 247.90 63.60 14835.56926
2,479.04 495.81 495.81 127.20 29671.13852
2,479.04 1,115.57 1,115.57 286.20 66760.06167
2,479.04 247.90 247.90 63.60 14835.56926
2,479.04 123.95 123.95 31.80 7417.78463
2,479.04 247.90 247.90 63.60 14835.56926
60.002.1061
448.40 112.10 112.10 25.03 5061.5566519
448.40 134.52 134.52 30.03 6073.86798228
448.40 112.10 112.10 25.03 5061.5566519
448.40 44.84 44.84 10.01 2024.62266076
448.40 44.84 44.84 10.01 2024.62266076
60.002.1062
138.00 34.50 34.50 15.00 2659.35
138.00 41.40 41.40 18.00 3191.22
138.00 34.50 34.50 15.00 2659.35
138.00 13.80 13.80 6.00 1063.74
138.00 13.80 13.80 6.00 1063.74

30.003.0002
830,331.95 830,331.95 29,262.80 52,255.00 830331.95 0.02
50.005.0005
1,242,834.32 1,242,834.32 18,644.51 4,424.00 1242834.32 0.00

20.001.0001
0.00 0.00 0.00 0.00 0

10.001.0003
97.20 9.72 874.80 9.72 9203.2257607
97.20 58.32 5,248.80 58.32 55219.3545642
97.20 29.16 2,624.40 29.16 27609.6772821
10.001.0103
32.80 3.28 236.16 3.28 2499.01922883
32.80 19.68 1,416.96 19.68 14994.115373
32.80 9.84 708.48 9.84 7497.0576865
10.001.0203
61.90 6.19 371.40 6.19 3917.03075627
61.90 37.14 2,228.40 37.14 23502.1845376
61.90 18.57 1,114.20 18.57 11751.0922688
10.001.0303
75.40 7.54 361.92 7.54 3825.14308343
75.40 45.24 2,171.52 45.24 22950.8585006
75.40 22.62 1,085.76 22.62 11475.4292503
10.001.0403
73.20 7.32 307.44 7.32 3248.72659063
73.20 43.92 1,844.64 43.92 19492.3595438
73.20 21.96 922.32 21.96 9746.1797719
10.001.0503
129.50 12.95 466.20 12.95 4893.54887974
129.50 77.70 2,797.20 77.70 29361.2932784
129.50 38.85 1,398.60 38.85 14680.6466392
10.005.0003
297.80 238.24 714.72 238.24 7465.88322497
297.80 59.56 178.68 59.56 1866.47080624
10.006.0003
9.30 7.44 714.24 7.44 7467.4163052
9.30 1.86 178.56 1.86 1866.8540763
10.008.0003
21.90 17.52 1,681.92 17.52 17544.8917899
21.90 4.38 420.48 4.38 4386.22294747
10.009.0003
7.40 5.92 461.76 5.92 4828.52037432
7.40 1.48 115.44 1.48 1207.13009358
10.009.0103
7.40 5.92 355.20 5.92 3714.24644179
7.40 1.48 88.80 1.48 928.561610447
10.009.0203
7.40 5.92 284.16 5.92 2965.6703227
7.40 1.48 71.04 1.48 741.417580675
10.015.0003
12.80 10.24 983.04 10.24 10244.8760877
12.80 2.56 245.76 2.56 2561.21902192

70.001.3001
96.00 9.60 9.60 0.10 189.682
96.00 57.60 57.60 0.60 1138.092
96.00 19.20 19.20 0.20 379.364
96.00 9.60 9.60 0.10 189.682
70.001.3002
96.00 9.60 9.60 0.10 189.682
96.00 57.60 57.60 0.60 1138.092
96.00 19.20 19.20 0.20 379.364
96.00 9.60 9.60 0.10 189.682
70.001.3003
311.32 31.13 31.13 0.10 615.126
311.32 186.79 186.79 0.60 3690.756
311.32 62.26 62.26 0.20 1230.252
311.32 31.13 31.13 0.10 615.126
70.001.3004
48.00 4.80 4.80 0.10 94.841
48.00 28.80 28.80 0.60 569.046
48.00 9.60 9.60 0.20 189.682
48.00 4.80 4.80 0.10 94.841
70.001.3005
311.32 31.13 31.13 0.10 615.126
311.32 186.79 186.79 0.60 3690.756
311.32 62.26 62.26 0.20 1230.252
311.32 31.13 31.13 0.10 615.126
70.001.3006
48.00 4.80 4.80 0.10 94.841
48.00 28.80 28.80 0.60 569.046
48.00 9.60 9.60 0.20 189.682
48.00 4.80 4.80 0.10 94.841
70.001.3007
96.00 9.60 9.60 0.10 189.682
96.00 57.60 57.60 0.60 1138.092
96.00 19.20 19.20 0.20 379.364
96.00 9.60 9.60 0.10 189.682
30.001.5002
480.00 48.00 48.00 0.10 948.408
480.00 192.00 192.00 0.40 3793.632
480.00 96.00 96.00 0.20 1896.816
480.00 96.00 96.00 0.20 1896.816
480.00 48.00 48.00 0.10 948.408
30.001.5003
480.00 48.00 48.00 0.10 948.408
480.00 192.00 192.00 0.40 3793.632
480.00 96.00 96.00 0.20 1896.816
480.00 96.00 96.00 0.20 1896.816
480.00 48.00 48.00 0.10 948.408
30.001.5004
360.00 36.00 36.00 0.10 711.306
360.00 144.00 144.00 0.40 2845.224
360.00 72.00 72.00 0.20 1422.612
360.00 72.00 72.00 0.20 1422.612
360.00 36.00 36.00 0.10 711.306
30.001.5034
3,600.00 360.00 360.00 0.10 7113.061
3,600.00 1,440.00 1,440.00 0.40 28452.244
3,600.00 720.00 720.00 0.20 14226.122
3,600.00 720.00 720.00 0.20 14226.122
3,600.00 360.00 360.00 0.10 7113.061
30.001.5035
768.00 76.80 76.80 0.40 1517.452
768.00 307.20 307.20 1.60 6069.808
768.00 153.60 153.60 0.80 3034.904
768.00 153.60 153.60 0.80 3034.904
768.00 76.80 76.80 0.40 1517.452
30.001.5036
1,920.00 192.00 192.00 1.00 3793.63
1,920.00 768.00 768.00 4.00 15174.52
1,920.00 384.00 384.00 2.00 7587.26
1,920.00 384.00 384.00 2.00 7587.26
1,920.00 192.00 192.00 1.00 3793.63
30.001.5037
32.40 3.24 3.24 0.10 64.018
32.40 12.96 12.96 0.40 256.072
32.40 6.48 6.48 0.20 128.036
32.40 6.48 6.48 0.20 128.036
32.40 3.24 3.24 0.10 64.018
30.001.5038
32.40 3.24 3.24 0.10 64.018
32.40 12.96 12.96 0.40 256.072
32.40 6.48 6.48 0.20 128.036
32.40 6.48 6.48 0.20 128.036
32.40 3.24 3.24 0.10 64.018
30.001.5039
32.40 3.24 3.24 0.10 64.018
32.40 12.96 12.96 0.40 256.072
32.40 6.48 6.48 0.20 128.036
32.40 6.48 6.48 0.20 128.036
32.40 3.24 3.24 0.10 64.018
30.001.5040
60.00 6.00 6.00 0.10 118.551
60.00 24.00 24.00 0.40 474.204
60.00 12.00 12.00 0.20 237.102
60.00 12.00 12.00 0.20 237.102
60.00 6.00 6.00 0.10 118.551
70.001.2601
759.46 75.95 75.95 791.11 1534.75146
759.46 455.68 455.68 4,746.65 9208.50876
759.46 151.89 151.89 1,582.22 3069.50292
759.46 75.95 75.95 791.11 1534.75146
70.001.2604
759.46 75.95 75.95 791.11 1534.75146
759.46 455.68 455.68 4,746.65 9208.50876
759.46 151.89 151.89 1,582.22 3069.50292
759.46 75.95 75.95 791.11 1534.75146
70.001.2607
4,952.52 495.25 495.25 5,502.80 9960.068
4,952.52 2,971.51 2,971.51 33,016.80 59760.408
4,952.52 990.50 990.50 11,005.60 19920.136
4,952.52 495.25 495.25 5,502.80 9960.068
70.001.2608
1,389.42 138.94 138.94 1,543.80 2794.278
1,389.42 833.65 833.65 9,262.80 16765.668
1,389.42 277.88 277.88 3,087.60 5588.556
1,389.42 138.94 138.94 1,543.80 2794.278
70.001.2609
4,952.52 495.25 495.25 5,502.80 9960.068
4,952.52 2,971.51 2,971.51 33,016.80 59760.408
4,952.52 990.50 990.50 11,005.60 19920.136
4,952.52 495.25 495.25 5,502.80 9960.068
70.001.2610
1,389.42 138.94 138.94 1,543.80 2794.278
1,389.42 833.65 833.65 9,262.80 16765.668
1,389.42 277.88 277.88 3,087.60 5588.556
1,389.42 138.94 138.94 1,543.80 2794.278
70.001.2611
1,350.00 135.00 135.00 1,500.00 2715
1,350.00 810.00 810.00 9,000.00 16290
1,350.00 270.00 270.00 3,000.00 5430
1,350.00 135.00 135.00 1,500.00 2715
70.001.2612
837.94 83.79 83.79 872.85 1693.329
837.94 502.76 502.76 5,237.10 10159.974
837.94 167.59 167.59 1,745.70 3386.658
837.94 83.79 83.79 872.85 1693.329
70.001.2614
1,536.75 153.68 153.68 1,707.50 3090.575
1,536.75 922.05 922.05 10,245.00 18543.45
1,536.75 307.35 307.35 3,415.00 6181.15
1,536.75 153.68 153.68 1,707.50 3090.575
70.001.2616
837.94 83.79 83.79 872.85 1693.329
837.94 502.76 502.76 5,237.10 10159.974
837.94 167.59 167.59 1,745.70 3386.658
837.94 83.79 83.79 872.85 1693.329
70.001.2618
1,536.75 153.68 153.68 1,707.50 3090.575
1,536.75 922.05 922.05 10,245.00 18543.45
1,536.75 307.35 307.35 3,415.00 6181.15
1,536.75 153.68 153.68 1,707.50 3090.575
70.001.2620
73.00 7.30 7.30 86.90 146.861
73.00 43.80 43.80 521.40 881.166
73.00 14.60 14.60 173.80 293.722
73.00 7.30 7.30 86.90 146.861
70.001.2621
73.00 7.30 7.30 86.90 146.861
73.00 43.80 43.80 521.40 881.166
73.00 14.60 14.60 173.80 293.722
73.00 7.30 7.30 86.90 146.861
70.001.2622
75.95 7.60 7.60 90.42 152.8098
75.95 45.57 45.57 542.52 916.8588
75.95 15.19 15.19 180.84 305.6196
75.95 7.60 7.60 90.42 152.8098
70.001.2625
986.49 98.65 98.65 1,027.60 1993.54012
986.49 591.90 591.90 6,165.59 11961.24072
986.49 197.30 197.30 2,055.20 3987.08024
986.49 98.65 98.65 1,027.60 1993.54012
70.001.2628
951.36 95.14 95.14 991.00 1922.54
951.36 570.82 570.82 5,946.00 11535.24
951.36 190.27 190.27 1,982.00 3845.08
951.36 95.14 95.14 991.00 1922.54
70.001.2629
951.36 95.14 95.14 991.00 1922.54
951.36 570.82 570.82 5,946.00 11535.24
951.36 190.27 190.27 1,982.00 3845.08
951.36 95.14 95.14 991.00 1922.54
70.001.2632
2,208.00 220.80 220.80 2,300.00 4462
2,208.00 1,324.80 1,324.80 13,800.00 26772
2,208.00 441.60 441.60 4,600.00 8924
2,208.00 220.80 220.80 2,300.00 4462
70.001.2633
364.80 36.48 36.48 380.00 737.2
364.80 218.88 218.88 2,280.00 4423.2
364.80 72.96 72.96 760.00 1474.4
364.80 36.48 36.48 380.00 737.2
70.001.2634
2,208.00 220.80 220.80 2,300.00 4462
2,208.00 1,324.80 1,324.80 13,800.00 26772
2,208.00 441.60 441.60 4,600.00 8924
2,208.00 220.80 220.80 2,300.00 4462
70.001.2635
364.80 36.48 36.48 380.00 737.2
364.80 218.88 218.88 2,280.00 4423.2
364.80 72.96 72.96 760.00 1474.4
364.80 36.48 36.48 380.00 737.2
70.001.3806
108.00 10.80 10.80 0.10 213.392
108.00 64.80 64.80 0.60 1280.352
108.00 21.60 21.60 0.20 426.784
108.00 10.80 10.80 0.10 213.392
70.001.3807
180.00 18.00 18.00 0.10 355.653
180.00 108.00 108.00 0.60 2133.918
180.00 36.00 36.00 0.20 711.306
180.00 18.00 18.00 0.10 355.653
70.001.3808
192.00 19.20 19.20 0.10 379.363
192.00 115.20 115.20 0.60 2276.178
192.00 38.40 38.40 0.20 758.726
192.00 19.20 19.20 0.10 379.363
70.001.3809
192.00 19.20 19.20 0.10 379.363
192.00 115.20 115.20 0.60 2276.178
192.00 38.40 38.40 0.20 758.726
192.00 19.20 19.20 0.10 379.363
70.001.3810
192.00 19.20 19.20 0.10 379.363
192.00 115.20 115.20 0.60 2276.178
192.00 38.40 38.40 0.20 758.726
192.00 19.20 19.20 0.10 379.363
70.001.3811
192.00 19.20 19.20 0.10 379.363
192.00 115.20 115.20 0.60 2276.178
192.00 38.40 38.40 0.20 758.726
192.00 19.20 19.20 0.10 379.363
70.001.3813
108.00 10.80 10.80 0.10 213.392
108.00 64.80 64.80 0.60 1280.352
108.00 21.60 21.60 0.20 426.784
108.00 10.80 10.80 0.10 213.392
70.001.3814
180.00 18.00 18.00 0.10 355.653
180.00 108.00 108.00 0.60 2133.918
180.00 36.00 36.00 0.20 711.306
180.00 18.00 18.00 0.10 355.653
70.001.3815
192.00 19.20 19.20 0.10 379.363
192.00 115.20 115.20 0.60 2276.178
192.00 38.40 38.40 0.20 758.726
192.00 19.20 19.20 0.10 379.363
70.001.3816
192.00 19.20 19.20 0.10 379.363
192.00 115.20 115.20 0.60 2276.178
192.00 38.40 38.40 0.20 758.726
192.00 19.20 19.20 0.10 379.363
70.001.3817
192.00 19.20 19.20 0.10 379.363
192.00 115.20 115.20 0.60 2276.178
192.00 38.40 38.40 0.20 758.726
192.00 19.20 19.20 0.10 379.363
70.001.3818
192.00 19.20 19.20 0.10 379.363
192.00 115.20 115.20 0.60 2276.178
192.00 38.40 38.40 0.20 758.726
192.00 19.20 19.20 0.10 379.363
80.001.0101
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 1,582.86 1,582.86 0.06 34280.725
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 633.14 633.14 0.03 13712.29
25,325.78 316.57 316.57 0.01 6856.145
80.001.0101
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 1,582.86 1,582.86 0.06 34280.725
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 633.14 633.14 0.03 13712.29
25,325.78 316.57 316.57 0.01 6856.145
80.001.0101
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 1,582.86 1,582.86 0.06 34280.725
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 633.14 633.14 0.03 13712.29
25,325.78 316.57 316.57 0.01 6856.145
80.001.0101
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 1,582.86 1,582.86 0.06 34280.725
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 633.14 633.14 0.03 13712.29
25,325.78 316.57 316.57 0.01 6856.145
80.001.0101
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 1,582.86 1,582.86 0.06 34280.725
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 633.14 633.14 0.03 13712.29
25,325.78 316.57 316.57 0.01 6856.145
80.001.0101
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 1,582.86 1,582.86 0.06 34280.725
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 633.14 633.14 0.03 13712.29
25,325.78 316.57 316.57 0.01 6856.145
80.001.0101
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 1,582.86 1,582.86 0.06 34280.725
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 633.14 633.14 0.03 13712.29
25,325.78 316.57 316.57 0.01 6856.145
80.001.0101
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 1,582.86 1,582.86 0.06 34280.725
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 633.14 633.14 0.03 13712.29
25,325.78 316.57 316.57 0.01 6856.145
80.001.0102
192.00 19.20 19.20 0.10 415.823
192.00 96.00 96.00 0.50 2079.115
192.00 19.20 19.20 0.10 415.823
192.00 38.40 38.40 0.20 831.646
192.00 19.20 19.20 0.10 415.823
80.001.0103
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0104
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0105
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0106
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0107
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0108
192.00 19.20 19.20 0.10 415.823
192.00 96.00 96.00 0.50 2079.115
192.00 19.20 19.20 0.10 415.823
192.00 38.40 38.40 0.20 831.646
192.00 19.20 19.20 0.10 415.823
80.001.0109
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0110
720.00 72.00 72.00 0.10 1559.336
720.00 360.00 360.00 0.50 7796.68
720.00 72.00 72.00 0.10 1559.336
720.00 144.00 144.00 0.20 3118.672
720.00 72.00 72.00 0.10 1559.336
80.001.0111
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0112
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0113
192.00 19.20 19.20 0.10 415.823
192.00 96.00 96.00 0.50 2079.115
192.00 19.20 19.20 0.10 415.823
192.00 38.40 38.40 0.20 831.646
192.00 19.20 19.20 0.10 415.823
80.001.0114
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0115
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0116
1,620.00 162.00 162.00 0.10 3508.505
1,620.00 810.00 810.00 0.50 17542.525
1,620.00 162.00 162.00 0.10 3508.505
1,620.00 324.00 324.00 0.20 7017.01
1,620.00 162.00 162.00 0.10 3508.505
80.001.0117
192.00 19.20 19.20 0.10 415.823
192.00 96.00 96.00 0.50 2079.115
192.00 19.20 19.20 0.10 415.823
192.00 38.40 38.40 0.20 831.646
192.00 19.20 19.20 0.10 415.823
80.001.0118
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 1,582.86 1,582.86 0.06 34280.725
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 633.14 633.14 0.03 13712.29
25,325.78 316.57 316.57 0.01 6856.145
80.001.0118
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 1,582.86 1,582.86 0.06 34280.725
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 633.14 633.14 0.03 13712.29
25,325.78 316.57 316.57 0.01 6856.145
80.001.0118
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 1,582.86 1,582.86 0.06 34280.725
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 633.14 633.14 0.03 13712.29
25,325.78 316.57 316.57 0.01 6856.145
80.001.0118
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 1,582.86 1,582.86 0.06 34280.725
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 633.14 633.14 0.03 13712.29
25,325.78 316.57 316.57 0.01 6856.145
80.001.0118
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 1,582.86 1,582.86 0.06 34280.725
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 633.14 633.14 0.03 13712.29
25,325.78 316.57 316.57 0.01 6856.145
80.001.0118
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 1,582.86 1,582.86 0.06 34280.725
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 633.14 633.14 0.03 13712.29
25,325.78 316.57 316.57 0.01 6856.145
80.001.0118
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 1,582.86 1,582.86 0.06 34280.725
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 633.14 633.14 0.03 13712.29
25,325.78 316.57 316.57 0.01 6856.145
80.001.0118
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 1,582.86 1,582.86 0.06 34280.725
25,325.78 316.57 316.57 0.01 6856.145
25,325.78 633.14 633.14 0.03 13712.29
25,325.78 316.57 316.57 0.01 6856.145
80.001.0119
192.00 19.20 19.20 0.10 415.823
192.00 96.00 96.00 0.50 2079.115
192.00 19.20 19.20 0.10 415.823
192.00 38.40 38.40 0.20 831.646
192.00 19.20 19.20 0.10 415.823
80.001.0120
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0121
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0122
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0123
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0124
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0125
192.00 19.20 19.20 0.10 415.823
192.00 96.00 96.00 0.50 2079.115
192.00 19.20 19.20 0.10 415.823
192.00 38.40 38.40 0.20 831.646
192.00 19.20 19.20 0.10 415.823
80.001.0126
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0127
720.00 72.00 72.00 0.10 1559.336
720.00 360.00 360.00 0.50 7796.68
720.00 72.00 72.00 0.10 1559.336
720.00 144.00 144.00 0.20 3118.672
720.00 72.00 72.00 0.10 1559.336
80.001.0128
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0129
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0130
192.00 19.20 19.20 0.10 415.823
192.00 96.00 96.00 0.50 2079.115
192.00 19.20 19.20 0.10 415.823
192.00 38.40 38.40 0.20 831.646
192.00 19.20 19.20 0.10 415.823
80.001.0131
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0132
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0133
192.00 19.20 19.20 0.10 415.823
192.00 96.00 96.00 0.50 2079.115
192.00 19.20 19.20 0.10 415.823
192.00 38.40 38.40 0.20 831.646
192.00 19.20 19.20 0.10 415.823
80.001.0134
96.00 9.60 9.60 0.10 207.911
96.00 48.00 48.00 0.50 1039.555
96.00 9.60 9.60 0.10 207.911
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.0135
192.00 19.20 19.20 0.10 415.823
192.00 96.00 96.00 0.50 2079.115
192.00 19.20 19.20 0.10 415.823
192.00 38.40 38.40 0.20 831.646
192.00 19.20 19.20 0.10 415.823
80.001.0501
4,320.00 432.00 432.00 0.10 9356.013
4,320.00 864.00 864.00 0.20 18712.026
4,320.00 1,296.00 1,296.00 0.30 28068.039
4,320.00 432.00 432.00 0.10 9356.013
4,320.00 864.00 864.00 0.20 18712.026
4,320.00 432.00 432.00 0.10 9356.013
80.001.0502
900.00 90.00 90.00 0.10 1949.169
900.00 180.00 180.00 0.20 3898.338
900.00 270.00 270.00 0.30 5847.507
900.00 90.00 90.00 0.10 1949.169
900.00 180.00 180.00 0.20 3898.338
900.00 90.00 90.00 0.10 1949.169
80.001.0503
420.00 42.00 42.00 0.10 909.612
420.00 84.00 84.00 0.20 1819.224
420.00 126.00 126.00 0.30 2728.836
420.00 42.00 42.00 0.10 909.612
420.00 84.00 84.00 0.20 1819.224
420.00 42.00 42.00 0.10 909.612
80.001.0504
420.00 42.00 42.00 0.10 909.612
420.00 84.00 84.00 0.20 1819.224
420.00 126.00 126.00 0.30 2728.836
420.00 42.00 42.00 0.10 909.612
420.00 84.00 84.00 0.20 1819.224
420.00 42.00 42.00 0.10 909.612
80.001.0505
420.00 42.00 42.00 0.10 909.612
420.00 84.00 84.00 0.20 1819.224
420.00 126.00 126.00 0.30 2728.836
420.00 42.00 42.00 0.10 909.612
420.00 84.00 84.00 0.20 1819.224
420.00 42.00 42.00 0.10 909.612
80.001.0506
144.00 14.40 14.40 0.10 311.867
144.00 28.80 28.80 0.20 623.734
144.00 43.20 43.20 0.30 935.601
144.00 14.40 14.40 0.10 311.867
144.00 28.80 28.80 0.20 623.734
144.00 14.40 14.40 0.10 311.867
80.001.0507
60.00 6.00 6.00 0.10 129.945
60.00 12.00 12.00 0.20 259.89
60.00 18.00 18.00 0.30 389.835
60.00 6.00 6.00 0.10 129.945
60.00 12.00 12.00 0.20 259.89
60.00 6.00 6.00 0.10 129.945
80.001.0508
393.60 39.36 39.36 0.10 852.437
393.60 78.72 78.72 0.20 1704.874
393.60 118.08 118.08 0.30 2557.311
393.60 39.36 39.36 0.10 852.437
393.60 78.72 78.72 0.20 1704.874
393.60 39.36 39.36 0.10 852.437
80.001.0509
393.60 39.36 39.36 0.10 852.437
393.60 78.72 78.72 0.20 1704.874
393.60 118.08 118.08 0.30 2557.311
393.60 39.36 39.36 0.10 852.437
393.60 78.72 78.72 0.20 1704.874
393.60 39.36 39.36 0.10 852.437
80.001.0510
4,320.00 432.00 432.00 0.10 9356.013
4,320.00 864.00 864.00 0.20 18712.026
4,320.00 1,296.00 1,296.00 0.30 28068.039
4,320.00 432.00 432.00 0.10 9356.013
4,320.00 864.00 864.00 0.20 18712.026
4,320.00 432.00 432.00 0.10 9356.013
80.001.0511
900.00 90.00 90.00 0.10 1949.169
900.00 180.00 180.00 0.20 3898.338
900.00 270.00 270.00 0.30 5847.507
900.00 90.00 90.00 0.10 1949.169
900.00 180.00 180.00 0.20 3898.338
900.00 90.00 90.00 0.10 1949.169
80.001.0512
420.00 42.00 42.00 0.10 909.612
420.00 84.00 84.00 0.20 1819.224
420.00 126.00 126.00 0.30 2728.836
420.00 42.00 42.00 0.10 909.612
420.00 84.00 84.00 0.20 1819.224
420.00 42.00 42.00 0.10 909.612
80.001.0513
420.00 42.00 42.00 0.10 909.612
420.00 84.00 84.00 0.20 1819.224
420.00 126.00 126.00 0.30 2728.836
420.00 42.00 42.00 0.10 909.612
420.00 84.00 84.00 0.20 1819.224
420.00 42.00 42.00 0.10 909.612
80.001.0514
420.00 42.00 42.00 0.10 909.612
420.00 84.00 84.00 0.20 1819.224
420.00 126.00 126.00 0.30 2728.836
420.00 42.00 42.00 0.10 909.612
420.00 84.00 84.00 0.20 1819.224
420.00 42.00 42.00 0.10 909.612
80.001.0515
180.00 18.00 18.00 0.10 389.834
180.00 36.00 36.00 0.20 779.668
180.00 54.00 54.00 0.30 1169.502
180.00 18.00 18.00 0.10 389.834
180.00 36.00 36.00 0.20 779.668
180.00 18.00 18.00 0.10 389.834
80.001.0516
492.00 49.20 49.20 0.10 1065.546
492.00 98.40 98.40 0.20 2131.092
492.00 147.60 147.60 0.30 3196.638
492.00 49.20 49.20 0.10 1065.546
492.00 98.40 98.40 0.20 2131.092
492.00 49.20 49.20 0.10 1065.546
80.001.0517
492.00 49.20 49.20 0.10 1065.546
492.00 98.40 98.40 0.20 2131.092
492.00 147.60 147.60 0.30 3196.638
492.00 49.20 49.20 0.10 1065.546
492.00 98.40 98.40 0.20 2131.092
492.00 49.20 49.20 0.10 1065.546
80.001.3101
2,520.00 252.00 252.00 0.10 5457.674
2,520.00 504.00 504.00 0.20 10915.348
2,520.00 756.00 756.00 0.30 16373.022
2,520.00 252.00 252.00 0.10 5457.674
2,520.00 504.00 504.00 0.20 10915.348
2,520.00 252.00 252.00 0.10 5457.674
80.001.3102
252.00 25.20 25.20 0.10 497.914
252.00 50.40 50.40 0.20 995.828
252.00 75.60 75.60 0.30 1493.742
252.00 25.20 25.20 0.10 497.914
252.00 50.40 50.40 0.20 995.828
252.00 25.20 25.20 0.10 497.914
80.001.3202
84.00 8.40 8.40 0.10 165.971
84.00 50.40 50.40 0.60 995.826
84.00 16.80 16.80 0.20 331.942
84.00 8.40 8.40 0.10 165.971
80.001.3203
117.00 11.70 11.70 0.10 310.213
117.00 70.20 70.20 0.60 1861.278
117.00 23.40 23.40 0.20 620.426
117.00 11.70 11.70 0.10 310.213
80.001.3207
117.00 11.70 11.70 0.10 231.174
117.00 70.20 70.20 0.60 1387.044
117.00 23.40 23.40 0.20 462.348
117.00 11.70 11.70 0.10 231.174
80.001.3401
432.00 43.20 43.20 0.10 853.567
432.00 86.40 86.40 0.20 1707.134
432.00 172.80 172.80 0.40 3414.268
432.00 86.40 86.40 0.20 1707.134
432.00 43.20 43.20 0.10 853.567
80.001.3501
4,800.00 480.00 480.00 0.10 10395.57
4,800.00 1,920.00 1,920.00 0.40 41582.28
4,800.00 960.00 960.00 0.20 20791.14
4,800.00 960.00 960.00 0.20 20791.14
4,800.00 480.00 480.00 0.10 10395.57
80.001.3502
3,360.00 336.00 336.00 0.10 6773.82
3,360.00 1,344.00 1,344.00 0.40 27095.28
3,360.00 672.00 672.00 0.20 13547.64
3,360.00 672.00 672.00 0.20 13547.64
3,360.00 336.00 336.00 0.10 6773.82
80.001.3503
288.00 28.80 28.80 0.10 569.045
288.00 115.20 115.20 0.40 2276.18
288.00 57.60 57.60 0.20 1138.09
288.00 57.60 57.60 0.20 1138.09
288.00 28.80 28.80 0.10 569.045
80.001.3504
384.00 38.40 38.40 0.10 758.727
384.00 153.60 153.60 0.40 3034.908
384.00 76.80 76.80 0.20 1517.454
384.00 76.80 76.80 0.20 1517.454
384.00 38.40 38.40 0.10 758.727
80.001.3505
54.00 5.40 5.40 0.10 106.696
54.00 21.60 21.60 0.40 426.784
54.00 10.80 10.80 0.20 213.392
54.00 10.80 10.80 0.20 213.392
54.00 5.40 5.40 0.10 106.696
80.001.3506
24.00 2.40 2.40 0.10 47.42
24.00 9.60 9.60 0.40 189.68
24.00 4.80 4.80 0.20 94.84
24.00 4.80 4.80 0.20 94.84
24.00 2.40 2.40 0.10 47.42
80.001.3507
360.00 36.00 36.00 0.10 725.766
360.00 144.00 144.00 0.40 2903.064
360.00 72.00 72.00 0.20 1451.532
360.00 72.00 72.00 0.20 1451.532
360.00 36.00 36.00 0.10 725.766
80.001.3508
360.00 36.00 36.00 0.10 711.306
360.00 144.00 144.00 0.40 2845.224
360.00 72.00 72.00 0.20 1422.612
360.00 72.00 72.00 0.20 1422.612
360.00 36.00 36.00 0.10 711.306
80.001.3509
360.00 36.00 36.00 0.10 711.306
360.00 144.00 144.00 0.40 2845.224
360.00 72.00 72.00 0.20 1422.612
360.00 72.00 72.00 0.20 1422.612
360.00 36.00 36.00 0.10 711.306
80.001.3510
360.00 36.00 36.00 0.10 711.306
360.00 144.00 144.00 0.40 2845.224
360.00 72.00 72.00 0.20 1422.612
360.00 72.00 72.00 0.20 1422.612
360.00 36.00 36.00 0.10 711.306
80.001.3511
360.00 36.00 36.00 0.10 711.306
360.00 144.00 144.00 0.40 2845.224
360.00 72.00 72.00 0.20 1422.612
360.00 72.00 72.00 0.20 1422.612
360.00 36.00 36.00 0.10 711.306
80.001.3512
360.00 36.00 36.00 0.10 711.306
360.00 144.00 144.00 0.40 2845.224
360.00 72.00 72.00 0.20 1422.612
360.00 72.00 72.00 0.20 1422.612
360.00 36.00 36.00 0.10 711.306
80.001.3513
360.00 36.00 36.00 0.10 711.306
360.00 144.00 144.00 0.40 2845.224
360.00 72.00 72.00 0.20 1422.612
360.00 72.00 72.00 0.20 1422.612
360.00 36.00 36.00 0.10 711.306
80.001.3514
408.00 40.80 40.80 0.10 806.147
408.00 163.20 163.20 0.40 3224.588
408.00 81.60 81.60 0.20 1612.294
408.00 81.60 81.60 0.20 1612.294
408.00 40.80 40.80 0.10 806.147
80.001.3515
36.00 3.60 3.60 0.10 72.577
36.00 14.40 14.40 0.40 290.308
36.00 7.20 7.20 0.20 145.154
36.00 7.20 7.20 0.20 145.154
36.00 3.60 3.60 0.10 72.577
80.001.3901
288.00 28.80 28.80 0.10 569.045
288.00 172.80 172.80 0.60 3414.27
288.00 57.60 57.60 0.20 1138.09
288.00 28.80 28.80 0.10 569.045
80.001.3902
120.00 12.00 12.00 0.10 237.102
120.00 72.00 72.00 0.60 1422.612
120.00 24.00 24.00 0.20 474.204
120.00 12.00 12.00 0.10 237.102
80.001.3903
288.00 28.80 28.80 0.10 569.045
288.00 172.80 172.80 0.60 3414.27
288.00 57.60 57.60 0.20 1138.09
288.00 28.80 28.80 0.10 569.045
80.001.3904
216.00 21.60 21.60 0.10 426.784
216.00 129.60 129.60 0.60 2560.704
216.00 43.20 43.20 0.20 853.568
216.00 21.60 21.60 0.10 426.784
80.001.3905
216.00 21.60 21.60 0.10 426.784
216.00 129.60 129.60 0.60 2560.704
216.00 43.20 43.20 0.20 853.568
216.00 21.60 21.60 0.10 426.784
80.001.3906
216.00 21.60 21.60 0.10 426.784
216.00 129.60 129.60 0.60 2560.704
216.00 43.20 43.20 0.20 853.568
216.00 21.60 21.60 0.10 426.784
80.001.3907
216.00 21.60 21.60 0.10 426.784
216.00 129.60 129.60 0.60 2560.704
216.00 43.20 43.20 0.20 853.568
216.00 21.60 21.60 0.10 426.784
80.001.4001
2,137.57 213.76 213.76 0.10 4629.433
2,137.57 1,282.54 1,282.54 0.60 27776.598
2,137.57 427.51 427.51 0.20 9258.866
2,137.57 213.76 213.76 0.10 4629.433
80.001.4002
96.00 9.60 9.60 0.10 207.911
96.00 57.60 57.60 0.60 1247.466
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.4003
129.60 12.96 12.96 0.10 280.68
129.60 77.76 77.76 0.60 1684.08
129.60 25.92 25.92 0.20 561.36
129.60 12.96 12.96 0.10 280.68
80.001.4004
90.00 9.00 9.00 0.10 194.917
90.00 54.00 54.00 0.60 1169.502
90.00 18.00 18.00 0.20 389.834
90.00 9.00 9.00 0.10 194.917
80.001.4005
2,137.57 213.76 213.76 0.10 4629.433
2,137.57 1,282.54 1,282.54 0.60 27776.598
2,137.57 427.51 427.51 0.20 9258.866
2,137.57 213.76 213.76 0.10 4629.433
80.001.4006
96.00 9.60 9.60 0.10 207.911
96.00 57.60 57.60 0.60 1247.466
96.00 19.20 19.20 0.20 415.822
96.00 9.60 9.60 0.10 207.911
80.001.4007
129.60 12.96 12.96 0.10 280.68
129.60 77.76 77.76 0.60 1684.08
129.60 25.92 25.92 0.20 561.36
129.60 12.96 12.96 0.10 280.68
80.001.4901
1,050.00 105.00 105.00 0.10 2074.643
1,050.00 630.00 630.00 0.60 12447.858
1,050.00 210.00 210.00 0.20 4149.286
1,050.00 105.00 105.00 0.10 2074.643
80.001.4902
108.00 10.80 10.80 0.10 213.392
108.00 64.80 64.80 0.60 1280.352
108.00 21.60 21.60 0.20 426.784
108.00 10.80 10.80 0.10 213.392
80.001.4903
96.00 9.60 9.60 0.10 189.682
96.00 57.60 57.60 0.60 1138.092
96.00 19.20 19.20 0.20 379.364
96.00 9.60 9.60 0.10 189.682
80.001.4904
1,050.00 105.00 105.00 0.10 2074.643
1,050.00 630.00 630.00 0.60 12447.858
1,050.00 210.00 210.00 0.20 4149.286
1,050.00 105.00 105.00 0.10 2074.643
80.001.4905
108.00 10.80 10.80 0.10 213.392
108.00 64.80 64.80 0.60 1280.352
108.00 21.60 21.60 0.20 426.784
108.00 10.80 10.80 0.10 213.392
80.001.4906
96.00 9.60 9.60 0.10 189.682
96.00 57.60 57.60 0.60 1138.092
96.00 19.20 19.20 0.20 379.364
96.00 9.60 9.60 0.10 189.682

20.001.0002
3,041.35 2,737.21 165.44 252.51 2737.211652
3,041.35 304.13 18.38 28.06 304.134628
20.001.0003
699.63 629.66 38.20 44.85 629.664516
699.63 69.96 4.24 4.98 69.962724
20.001.0004
74.43 66.99 4.06 6.20 66.99024
74.43 7.44 0.45 0.69 7.44336
20.001.0005
1,611.47 1,450.32 84.84 99.61 1450.324512
1,611.47 161.15 9.43 11.07 161.147168
20.001.0008
7,266.69 6,540.02 270.23 252.51 6540.01677
7,266.69 726.67 30.03 28.06 726.66853
20.001.0009
1,772.99 1,595.69 64.65 44.85 1595.688282
1,772.99 177.30 7.18 4.98 177.298698
20.001.0010
178.64 160.78 6.64 6.20 160.776576
178.64 17.86 0.74 0.69 17.864064
20.001.0011
3,906.93 3,516.24 143.58 99.61 3516.24006
3,906.93 390.69 15.95 11.07 390.69334
20.002.0001
590.24 531.22 31.08 15.30 531.216
590.24 59.02 3.45 1.70 59.024
20.002.0002
64.82 58.34 3.54 1.80 58.338
64.82 6.48 0.39 0.20 6.482
20.002.0003
32.41 29.17 1.77 0.90 29.169
32.41 3.24 0.20 0.10 3.241
20.002.0004
129.63 116.67 7.08 2.70 116.667
129.63 12.96 0.79 0.30 12.963
20.002.0005
194.46 175.01 10.61 2.70 175.014
194.46 19.45 1.18 0.30 19.446
20.002.0006
32.41 29.17 1.77 0.90 29.169
32.41 3.24 0.20 0.10 3.241
20.002.0007
1,556.18 1,400.56 81.38 20.70 1400.562
1,556.18 155.62 9.04 2.30 155.618
20.002.0008
432.15 388.94 23.59 4.50 388.935
432.15 43.22 2.62 0.50 43.215
20.002.0011
58.70 52.83 3.20 0.90 52.83
58.70 5.87 0.36 0.10 5.87
20.002.0012
167.08 150.37 9.12 3.60 150.372
167.08 16.71 1.01 0.40 16.708
20.002.0013
176.10 158.49 9.61 2.70 158.49
176.10 17.61 1.07 0.30 17.61
20.002.0014
736.27 662.64 38.76 15.30 662.643
736.27 73.63 4.31 1.70 73.627
20.002.0015
1,244.64 1,120.18 67.93 14.40 1120.176
1,244.64 124.46 7.55 1.60 124.464
20.002.0016
155.58 140.02 8.49 1.80 140.022
155.58 15.56 0.94 0.20 15.558
20.002.0017
1,745.92 1,571.33 95.29 14.40 1571.328
1,745.92 174.59 10.59 1.60 174.592
20.002.0018
5,600.88 5,040.79 305.69 64.80 5040.792
5,600.88 560.09 33.97 7.20 560.088
20.002.0019
1,855.04 1,669.54 101.25 15.30 1669.536
1,855.04 185.50 11.25 1.70 185.504
20.002.0021
19.45 17.51 1.06 0.90 17.505
19.45 1.95 0.12 0.10 1.945
20.002.0022
85.35 76.82 4.66 2.70 76.815
85.35 8.54 0.52 0.30 8.535
20.002.0023
104.35 93.92 5.31 4.50 93.915
104.35 10.44 0.59 0.50 10.435
20.002.0024
28.45 25.61 1.55 0.90 25.605
28.45 2.85 0.17 0.10 2.845
20.002.0026
43.21 38.89 2.36 0.90 38.889
43.21 4.32 0.26 0.10 4.321
20.002.0027
58.34 52.51 3.18 1.80 52.506
58.34 5.83 0.35 0.20 5.834
20.002.0028
33.49 30.14 1.83 0.90 30.141
33.49 3.35 0.20 0.10 3.349
20.002.0029
250.62 225.56 13.68 5.40 225.558
250.62 25.06 1.52 0.60 25.062
20.002.0030
33.49 30.14 1.83 0.90 30.141
33.49 3.35 0.20 0.10 3.349
20.002.0031
83.54 75.19 4.56 1.80 75.186
83.54 8.35 0.51 0.20 8.354
20.002.0032
556.64 500.98 29.25 14.40 500.976
556.64 55.66 3.25 1.60 55.664
20.002.0033
1,506.05 1,355.45 79.80 31.50 1355.445
1,506.05 150.61 8.87 3.50 150.605
20.002.0034
116.68 105.01 6.37 3.60 105.012
116.68 11.67 0.71 0.40 11.668
20.002.0035
250.62 225.56 13.68 5.40 225.558
250.62 25.06 1.52 0.60 25.062
20.002.0036
41.77 37.59 2.28 0.90 37.593
41.77 4.18 0.25 0.10 4.177
20.002.0037
41.77 37.59 2.28 0.90 37.593
41.77 4.18 0.25 0.10 4.177
20.002.0038
109.12 98.21 5.96 0.90 98.208
109.12 10.91 0.66 0.10 10.912
20.002.0039
436.48 392.83 23.82 3.60 392.832
436.48 43.65 2.65 0.40 43.648
20.002.0040
638.12 574.31 34.83 3.60 574.308
638.12 63.81 3.87 0.40 63.812
20.002.0041
113.80 102.42 6.21 0.90 102.42
113.80 11.38 0.69 0.10 11.38
20.002.0042
569.00 512.10 31.06 4.50 512.1
569.00 56.90 3.45 0.50 56.9
20.002.0043
957.18 861.46 52.25 5.40 861.462
957.18 95.72 5.81 0.60 95.718
20.002.0044
1,263.10 1,136.79 66.50 15.30 1136.79
1,263.10 126.31 7.39 1.70 126.31
20.002.0046
1,122.51 1,010.26 59.09 15.30 1010.259
1,122.51 112.25 6.57 1.70 112.251
30.001.0001
97.48 87.73 4.39 1.80 87.732
97.48 9.75 0.49 0.20 9.748
30.001.0003
316.82 285.14 14.03 0.90 285.138
316.82 31.68 1.56 0.10 31.682
30.001.0006
125.02 112.52 5.38 0.90 112.518
125.02 12.50 0.60 0.10 12.502
30.001.0007
633.54 570.19 23.22 5.40 570.186
633.54 63.35 2.58 0.60 63.354
30.001.0008
11,211.19 10,090.07 482.07 54.90 10090.071
11,211.19 1,121.12 53.56 6.10 1121.119
30.001.0009
3,572.80 3,215.52 180.30 14.40 3215.52
3,572.80 357.28 20.03 1.60 357.28
30.001.0010
1,430.70 1,287.63 67.74 9.00 1287.63
1,430.70 143.07 7.53 1.00 143.07
30.001.0011
308.90 278.01 18.75 0.90 278.01
308.90 30.89 2.08 0.10 30.89
30.001.0014
50.42 45.38 2.75 1.80 45.378
50.42 5.04 0.31 0.20 5.042
30.001.0015
571.20 514.08 30.07 15.30 514.08
571.20 57.12 3.34 1.70 57.12
30.001.0016
24,875.50 22,387.95 1,107.29 292.50 22387.95
24,875.50 2,487.55 123.03 32.50 2487.55
40.001.0001
0.00 0.00 0.00 4.50 0
0.00 0.00 0.00 0.50 0
40.001.0002
0.00 0.00 0.00 1.80 0
0.00 0.00 0.00 0.20 0
40.001.0004
0.00 0.00 0.00 4.50 0
0.00 0.00 0.00 0.50 0
40.001.0005
0.00 0.00 0.00 2.70 0
0.00 0.00 0.00 0.30 0
40.001.0007
0.00 0.00 0.00 4.50 0
0.00 0.00 0.00 0.50 0
40.001.0014
0.00 0.00 0.00 0.90 0
0.00 0.00 0.00 0.10 0
40.001.0015
0.00 0.00 0.00 4.50 0
0.00 0.00 0.00 0.50 0
40.001.0016
0.00 0.00 0.00 4.50 0
0.00 0.00 0.00 0.50 0
40.001.0017
0.00 0.00 0.00 4.50 0
0.00 0.00 0.00 0.50 0
40.001.0018
0.00 0.00 0.00 4.50 0
0.00 0.00 0.00 0.50 0
40.001.0021
0.00 0.00 0.00 2.70 0
0.00 0.00 0.00 0.30 0
40.001.0022
0.00 0.00 0.00 1.80 0
0.00 0.00 0.00 0.20 0
40.001.0023
0.00 0.00 0.00 6.30 0
0.00 0.00 0.00 0.70 0
40.001.0027
0.00 0.00 0.00 0.90 0
0.00 0.00 0.00 0.10 0
40.001.0028
0.00 0.00 0.00 1.80 0
0.00 0.00 0.00 0.20 0
40.001.0029
0.00 0.00 0.00 3.60 0
0.00 0.00 0.00 0.40 0
40.001.0030
0.00 0.00 0.00 5.40 0
0.00 0.00 0.00 0.60 0
40.001.0031
0.00 0.00 0.00 6.30 0
0.00 0.00 0.00 0.70 0
40.001.0032
0.00 0.00 0.00 3.60 0
0.00 0.00 0.00 0.40 0
40.007.0002
664.94 598.45 36.19 252.51 598.449411
664.94 66.49 4.02 28.06 66.494379
40.007.0003
117.60 105.84 6.43 44.85 105.841044
117.60 11.76 0.71 4.98 11.760116
40.007.0004
16.27 14.64 0.89 6.20 14.638608
16.27 1.63 0.10 0.69 1.626512
40.007.0005
271.16 244.04 14.27 99.61 244.04499
271.16 27.12 1.59 11.07 27.11611
40.007.0006
81.38 73.24 2.98 0.27 73.2375
81.38 8.14 0.33 0.03 8.1375
40.007.0007
3,169.47 2,852.52 116.19 37.55 2852.52156
3,169.47 316.95 12.91 4.17 316.94684
40.007.0008
12,385.65 11,147.09 404.21 102.25 11147.087862
12,385.65 1,238.57 44.91 11.36 1238.565318
40.007.0009
11.79 10.61 0.65 0.11 10.60704
11.79 1.18 0.07 0.01 1.17856
40.007.0011
5,402.45 4,862.21 201.87 84.53 4862.205864
5,402.45 540.25 22.43 9.39 540.245096
40.007.0012
1,814.63 1,633.16 66.91 28.02 1633.163391
1,814.63 181.46 7.43 3.11 181.462599
40.007.0018
2,664.17 2,397.75 114.56 62.10 2397.750498
2,664.17 266.42 12.73 6.90 266.416722
40.007.0019
3,284.46 2,956.01 157.86 48.59 2956.009518
3,284.46 328.45 17.54 5.40 328.445502
40.007.0024
10,768.51 9,691.66 528.84 285.05 9691.6626
10,768.51 1,076.85 58.76 31.67 1076.8514
60.101.0002
484.10 435.69 20.38 9.00 435.69
484.10 48.41 2.26 1.00 48.41
60.101.0004
705.92 635.33 27.59 7.20 635.328
705.92 70.59 3.07 0.80 70.592
60.101.0005
528.64 475.78 16.51 3.60 475.776
528.64 52.86 1.83 0.40 52.864
60.101.0006
788.34 709.51 35.85 6.30 709.506
788.34 78.83 3.98 0.70 78.834
60.101.0007
942.90 848.61 45.72 6.30 848.61
942.90 94.29 5.08 0.70 94.29
60.101.0008
2,188.96 1,970.06 72.74 7.20 1970.064
2,188.96 218.90 8.08 0.80 218.896
60.101.0009
380.20 342.18 18.81 9.00 342.18
380.20 38.02 2.09 1.00 38.02
60.101.0010
1,622.65 1,460.39 69.77 15.30 1460.385
1,622.65 162.27 7.75 1.70 162.265
60.101.0011
1,134.90 1,021.41 48.80 9.00 1021.41
1,134.90 113.49 5.42 1.00 113.49
60.101.0012
1,239.40 1,115.46 57.51 9.00 1115.46
1,239.40 123.94 6.39 1.00 123.94
60.101.0013
1,990.89 1,791.80 93.53 9.90 1791.801
1,990.89 199.09 10.39 1.10 199.089
60.101.0014
475.92 428.33 22.57 10.80 428.328
475.92 47.59 2.51 1.20 47.592
60.101.0015
641.16 577.04 32.21 11.70 577.044
641.16 64.12 3.58 1.30 64.116
60.101.0016
830.34 747.31 40.37 12.60 747.306
830.34 83.03 4.49 1.40 83.034
60.101.0017
1,669.44 1,502.50 83.83 14.40 1502.496
1,669.44 166.94 9.31 1.60 166.944
60.101.0018
1,550.57 1,395.51 82.96 15.30 1395.513
1,550.57 155.06 9.22 1.70 155.057
60.101.0019
2,885.41 2,596.87 144.55 15.30 2596.869
2,885.41 288.54 16.06 1.70 288.541
60.101.0020
2,488.80 2,239.92 126.22 15.30 2239.92
2,488.80 248.88 14.02 1.70 248.88
60.101.0021
4,875.26 4,387.73 253.88 15.30 4387.734
4,875.26 487.53 28.21 1.70 487.526
60.101.0022
1,016.60 914.94 43.71 15.30 914.94
1,016.60 101.66 4.86 1.70 101.66
60.101.0023
1,622.65 1,460.39 69.77 15.30 1460.385
1,622.65 162.27 7.75 1.70 162.265
20.001.0002
1,390.00 1,251.00 66.68 36.00 1251
1,390.00 139.00 7.41 4.00 139
20.001.0003
285.00 256.50 13.42 5.40 256.5
285.00 28.50 1.49 0.60 28.5
20.001.0004
103.41 93.07 5.00 2.70 93.069
103.41 10.34 0.56 0.30 10.341
20.001.0005
782.56 704.30 35.79 14.40 704.304
782.56 78.26 3.98 1.60 78.256
20.001.0006
187.76 168.98 11.08 0.90 168.984
187.76 18.78 1.23 0.10 18.776
20.001.0007
286.25 257.63 17.02 4.50 257.625
286.25 28.63 1.89 0.50 28.625
20.001.0008
1,424.00 1,281.60 69.20 14.40 1281.6
1,424.00 142.40 7.69 1.60 142.4
20.001.0009
315.88 284.29 12.12 1.80 284.292
315.88 31.59 1.35 0.20 31.588
20.001.0012
330.48 297.43 16.33 5.40 297.432
330.48 33.05 1.81 0.60 33.048
20.001.0013
204.76 184.28 10.89 3.60 184.284
204.76 20.48 1.21 0.40 20.476
20.001.0019
4,092.51 3,683.26 184.35 62.10 3683.257758
4,092.51 409.25 20.48 6.90 409.250862
20.001.0020
6,140.20 5,526.18 262.22 48.59 5526.177912
6,140.20 614.02 29.14 5.40 614.019768
20.001.0025
16,954.08 15,258.67 733.86 285.05 15258.667617
16,954.08 1,695.41 81.54 31.67 1695.407513
20.003.0001
92.28 83.05 4.13 0.90 83.052
92.28 9.23 0.46 0.10 9.228
20.003.0002
92.28 83.05 4.13 0.90 83.052
92.28 9.23 0.46 0.10 9.228
20.003.0003
172.86 155.57 9.43 0.90 155.574
172.86 17.29 1.05 0.10 17.286
20.003.0004
648.20 583.38 35.38 4.50 583.38
648.20 64.82 3.93 0.50 64.82
20.003.0005
20.88 18.79 1.14 1.80 18.792
20.88 2.09 0.13 0.20 2.088
20.003.0009
129.64 116.68 7.08 0.90 116.676
129.64 12.96 0.79 0.10 12.964
20.003.0010
388.92 350.03 21.23 2.70 350.028
388.92 38.89 2.36 0.30 38.892
20.003.0011
31.32 28.19 1.71 2.70 28.188
31.32 3.13 0.19 0.30 3.132
20.003.0012
20.88 18.79 1.14 1.80 18.792
20.88 2.09 0.13 0.20 2.088
20.003.0013
57.60 51.84 3.14 3.60 51.84
57.60 5.76 0.35 0.40 5.76
20.003.0017
69.52 62.57 3.62 7.20 62.568
69.52 6.95 0.40 0.80 6.952
20.003.0019
163.05 146.75 8.55 13.50 146.745
163.05 16.31 0.95 1.50 16.305
20.003.0020
24.13 21.72 1.32 0.90 21.717
24.13 2.41 0.15 0.10 2.413
20.003.0021
302.40 272.16 16.51 18.90 272.16
302.40 30.24 1.83 2.10 30.24
20.003.0022
162.82 146.54 7.15 6.30 146.538
162.82 16.28 0.79 0.70 16.282
20.003.0026
58.26 52.43 3.07 5.40 52.434
58.26 5.83 0.34 0.60 5.826
20.003.0027
44.45 40.01 2.26 4.50 40.005
44.45 4.45 0.25 0.50 4.445
20.003.0028
35.16 31.64 1.57 1.80 31.644
35.16 3.52 0.17 0.20 3.516
20.003.0029
16.56 14.90 0.90 1.80 14.904
16.56 1.66 0.10 0.20 1.656
20.003.0030
61.94 55.75 3.38 0.90 55.746
61.94 6.19 0.38 0.10 6.194
20.003.0031
280.44 252.40 14.94 17.10 252.396
280.44 28.04 1.66 1.90 28.044
20.003.0032
185.04 166.54 8.18 7.20 166.536
185.04 18.50 0.91 0.80 18.504
20.003.0033
109.74 98.77 4.78 2.70 98.766
109.74 10.97 0.53 0.30 10.974
20.003.0034
46.87 42.18 2.18 0.90 42.183
46.87 4.69 0.24 0.10 4.687
20.003.0035
356.52 320.87 19.46 0.90 320.868
356.52 35.65 2.16 0.10 35.652
20.003.0042
46.82 42.14 2.56 1.80 42.138
46.82 4.68 0.28 0.20 4.682
20.003.0044
36.02 32.42 1.97 1.80 32.418
36.02 3.60 0.22 0.20 3.602
20.003.0045
20.88 18.79 1.14 1.80 18.792
20.88 2.09 0.13 0.20 2.088
20.003.0046
10.44 9.40 0.57 0.90 9.396
10.44 1.04 0.06 0.10 1.044
20.003.0047
10.44 9.40 0.57 0.90 9.396
10.44 1.04 0.06 0.10 1.044
20.003.0048
62.51 56.26 3.16 6.30 56.259
62.51 6.25 0.35 0.70 6.251
20.003.0050
72.00 64.80 3.93 4.50 64.8
72.00 7.20 0.44 0.50 7.2
20.003.0051
66.99 60.29 3.07 2.70 60.291
66.99 6.70 0.34 0.30 6.699
20.003.0053
132.52 119.27 7.23 3.60 119.268
132.52 13.25 0.80 0.40 13.252
20.003.0054
425.70 383.13 20.64 4.50 383.13
425.70 42.57 2.29 0.50 42.57
20.003.0055
158.19 142.37 7.08 0.90 142.371
158.19 15.82 0.79 0.10 15.819
20.003.0056
316.37 284.73 14.15 0.90 284.733
316.37 31.64 1.57 0.10 31.637
20.003.0060
26.88 24.19 1.21 0.90 24.192
26.88 2.69 0.13 0.10 2.688
20.003.0061
274.04 246.64 12.30 15.30 246.636
274.04 27.40 1.37 1.70 27.404
20.003.0062
256.96 231.26 11.57 14.40 231.264
256.96 25.70 1.29 1.60 25.696
20.003.0065
1,740.80 1,566.72 76.36 57.60 1566.72
1,740.80 174.08 8.48 6.40 174.08
20.003.0068
44.22 39.80 1.88 2.70 39.798
44.22 4.42 0.21 0.30 4.422
20.003.0069
90.63 81.57 3.63 2.70 81.567
90.63 9.06 0.40 0.30 9.063
20.003.0077
285.00 256.50 11.65 4.50 256.5
285.00 28.50 1.29 0.50 28.5
20.003.0081
448.44 403.60 19.73 33.30 403.596
448.44 44.84 2.19 3.70 44.844
20.003.0083
1,885.13 1,696.62 84.60 15.30 1696.617
1,885.13 188.51 9.40 1.70 188.513
20.003.0084
573.12 515.81 25.60 43.20 515.808
573.12 57.31 2.84 4.80 57.312
20.003.0089
52.16 46.94 2.30 0.90 46.944
52.16 5.22 0.26 0.10 5.216
20.003.0090
834.54 751.09 37.59 5.40 751.086
834.54 83.45 4.18 0.60 83.454
20.003.0091
291.39 262.25 13.12 9.90 262.251
291.39 29.14 1.46 1.10 29.139
20.003.0092
26.88 24.19 1.21 0.90 24.192
26.88 2.69 0.13 0.10 2.688
20.003.0094
26.88 24.19 1.21 0.90 24.192
26.88 2.69 0.13 0.10 2.688
20.003.0095
425.44 382.90 19.09 14.40 382.896
425.44 42.54 2.12 1.60 42.544
30.001.0001
48.74 43.87 2.20 0.90 43.866
48.74 4.87 0.24 0.10 4.874
30.001.0007
172.86 155.57 9.43 2.70 155.574
172.86 17.29 1.05 0.30 17.286
30.001.0008
3,421.34 3,079.21 154.10 23.40 3079.206
3,421.34 342.13 17.12 2.60 342.134
30.001.0009
527.46 474.71 25.35 2.70 474.714
527.46 52.75 2.82 0.30 52.746
30.001.0010
265.10 238.59 11.01 1.80 238.59
265.10 26.51 1.22 0.20 26.51
30.001.0015
459.14 413.23 23.78 9.90 413.226
459.14 45.91 2.64 1.10 45.914
30.001.0016
11,212.50 10,091.25 497.66 135.00 10091.25
11,212.50 1,121.25 55.30 15.00 1121.25
40.006.0002
96.00 86.40 5.16 36.00 86.4
96.00 9.60 0.57 4.00 9.6
40.006.0003
14.16 12.74 0.77 5.40 12.744
14.16 1.42 0.09 0.60 1.416
40.006.0004
7.08 6.37 0.39 2.70 6.372
7.08 0.71 0.04 0.30 0.708
40.006.0005
40.00 36.00 2.06 14.40 36
40.00 4.00 0.23 1.60 4
40.006.0006
14.18 12.76 0.77 0.90 12.762
14.18 1.42 0.09 0.10 1.418
40.006.0007
23.65 21.29 1.29 4.50 21.285
23.65 2.37 0.14 0.50 2.365
40.006.0008
109.92 98.93 5.16 14.40 98.928
109.92 10.99 0.57 1.60 10.992
40.006.0009
23.54 21.19 0.90 1.80 21.186
23.54 2.35 0.10 0.20 2.354
40.006.0011
24.48 22.03 1.16 5.40 22.032
24.48 2.45 0.13 0.60 2.448
40.006.0012
15.44 13.90 0.77 3.60 13.896
15.44 1.54 0.09 0.40 1.544
40.006.0018
273.25 245.92 12.32 62.10 245.923128
273.25 27.32 1.37 6.90 27.324792
40.006.0019
470.29 423.26 20.09 48.59 423.258966
470.29 47.03 2.23 5.40 47.028774
40.006.0024
1,960.50 1,764.45 84.84 285.05 1764.452691
1,960.50 196.05 9.43 31.67 196.050299

20.001.00X1
2.00 0.20 5.40 0.20 100
2.00 0.40 10.80 0.40 200
2.00 0.80 21.60 0.80 400
2.00 0.40 10.80 0.40 200
2.00 0.20 5.40 0.20 100
20.001.0009
6.00 0.60 8.64 0.60 132.426
6.00 1.20 17.28 1.20 264.852
6.00 2.40 34.56 2.40 529.704
6.00 1.20 17.28 1.20 264.852
6.00 0.60 8.64 0.60 132.426
20.001.0010
10.00 1.00 54.00 1.00 632.74
10.00 2.00 108.00 2.00 1265.48
10.00 4.00 216.00 4.00 2530.96
10.00 2.00 108.00 2.00 1265.48
10.00 1.00 54.00 1.00 632.74
20.001.0016
30.00 3.00 43.20 3.00 662.31
30.00 6.00 86.40 6.00 1324.62
30.00 12.00 172.80 12.00 2649.24
30.00 6.00 86.40 6.00 1324.62
30.00 3.00 43.20 3.00 662.31
20.001.0018
5.00 0.50 7.20 0.50 110.35
5.00 1.00 14.40 1.00 220.7
5.00 2.00 28.80 2.00 441.4
5.00 1.00 14.40 1.00 220.7
5.00 0.50 7.20 0.50 110.35
20.001.0020
6.00 0.60 16.20 0.60 211.146
6.00 1.20 32.40 1.20 422.292
6.00 2.40 64.80 2.40 844.584
6.00 1.20 32.40 1.20 422.292
6.00 0.60 16.20 0.60 211.146
20.001.0022
8.00 0.80 33.60 0.80 406.112
8.00 1.60 67.20 1.60 812.224
8.00 3.20 134.40 3.20 1624.448
8.00 1.60 67.20 1.60 812.224
8.00 0.80 33.60 0.80 406.112
20.001.0023
7.00 0.70 29.40 0.70 355.348
7.00 1.40 58.80 1.40 710.696
7.00 2.80 117.60 2.80 1421.392
7.00 1.40 58.80 1.40 710.696
7.00 0.70 29.40 0.70 355.348
20.001.0026
2.00 0.20 8.40 0.20 101.528
2.00 0.40 16.80 0.40 203.056
2.00 0.80 33.60 0.80 406.112
2.00 0.40 16.80 0.40 203.056
2.00 0.20 8.40 0.20 101.528
20.001.0028
2.00 0.20 2.40 0.20 39.15
2.00 0.40 4.80 0.40 78.3
2.00 0.80 9.60 0.80 156.6
2.00 0.40 4.80 0.40 78.3
2.00 0.20 2.40 0.20 39.15
20.001.0029
2.00 0.20 5.40 0.20 70.41
2.00 0.40 10.80 0.40 140.82
2.00 0.80 21.60 0.80 281.64
2.00 0.40 10.80 0.40 140.82
2.00 0.20 5.40 0.20 70.41
20.001.0030
2.00 0.20 3.36 0.20 49.196
2.00 0.40 6.72 0.40 98.392
2.00 0.80 13.44 0.80 196.784
2.00 0.40 6.72 0.40 98.392
2.00 0.20 3.36 0.20 49.196
20.001.0031
8.00 0.80 7.68 0.80 136.664
8.00 1.60 15.36 1.60 273.328
8.00 3.20 30.72 3.20 546.656
8.00 1.60 15.36 1.60 273.328
8.00 0.80 7.68 0.80 136.664
20.001.0032
8.00 0.80 11.52 0.80 176.664
8.00 1.60 23.04 1.60 353.328
8.00 3.20 46.08 3.20 706.656
8.00 1.60 23.04 1.60 353.328
8.00 0.80 11.52 0.80 176.664
20.001.0034
10.00 1.00 27.00 1.00 351.7
10.00 2.00 54.00 2.00 703.4
10.00 4.00 108.00 4.00 1406.8
10.00 2.00 54.00 2.00 703.4
10.00 1.00 27.00 1.00 351.7
20.001.0035
2.00 0.20 5.40 0.20 70.34
2.00 0.40 10.80 0.40 140.68
2.00 0.80 21.60 0.80 281.36
2.00 0.40 10.80 0.40 140.68
2.00 0.20 5.40 0.20 70.34
20.001.0037
4.00 0.40 7.68 0.40 108.244
4.00 0.80 15.36 0.80 216.488
4.00 1.60 30.72 1.60 432.976
4.00 0.80 15.36 0.80 216.488
4.00 0.40 7.68 0.40 108.244
20.001.0038
2.00 0.20 2.40 0.20 39.162
2.00 0.40 4.80 0.40 78.324
2.00 0.80 9.60 0.80 156.648
2.00 0.40 4.80 0.40 78.324
2.00 0.20 2.40 0.20 39.162
20.001.0039
2.00 0.20 1.92 0.20 34.17
2.00 0.40 3.84 0.40 68.34
2.00 0.80 7.68 0.80 136.68
2.00 0.40 3.84 0.40 68.34
2.00 0.20 1.92 0.20 34.17
20.001.0045
2.00 0.20 5.40 0.20 70.34
2.00 0.40 10.80 0.40 140.68
2.00 0.80 21.60 0.80 281.36
2.00 0.40 10.80 0.40 140.68
2.00 0.20 5.40 0.20 70.34
20.001.0049
10.00 1.00 16.80 1.00 245.82
10.00 2.00 33.60 2.00 491.64
10.00 4.00 67.20 4.00 983.28
10.00 2.00 33.60 2.00 491.64
10.00 1.00 16.80 1.00 245.82
20.001.0053
2.00 0.20 5.40 0.20 70.34
2.00 0.40 10.80 0.40 140.68
2.00 0.80 21.60 0.80 281.36
2.00 0.40 10.80 0.40 140.68
2.00 0.20 5.40 0.20 70.34
20.001.0055
4.00 0.40 19.20 0.40 228.004
4.00 0.80 38.40 0.80 456.008
4.00 1.60 76.80 1.60 912.016
4.00 0.80 38.40 0.80 456.008
4.00 0.40 19.20 0.40 228.004
20.001.00X2
2.00 0.20 6.36 0.20 100
2.00 0.40 12.72 0.40 200
2.00 0.80 25.44 0.80 400
2.00 0.40 12.72 0.40 200
2.00 0.20 6.36 0.20 100
20.003.0001
24.00 2.40 23.04 2.40 410.232
24.00 4.80 46.08 4.80 820.464
24.00 9.60 92.16 9.60 1640.928
24.00 4.80 46.08 4.80 820.464
24.00 2.40 23.04 2.40 410.232
20.003.0002
4.00 0.40 38.40 0.40 428.108
4.00 0.80 76.80 0.80 856.216
4.00 1.60 153.60 1.60 1712.432
4.00 0.80 76.80 0.80 856.216
4.00 0.40 38.40 0.40 428.108
20.003.0003
4.00 0.40 21.60 0.40 253.236
4.00 0.80 43.20 0.80 506.472
4.00 1.60 86.40 1.60 1012.944
4.00 0.80 43.20 0.80 506.472
4.00 0.40 21.60 0.40 253.236
20.003.0010
2.00 0.20 6.36 0.20 100
2.00 0.40 12.72 0.40 200
2.00 0.80 25.44 0.80 400
2.00 0.40 12.72 0.40 200
2.00 0.20 6.36 0.20 100
20.004.0005
2.00 0.20 5.40 0.20 70.34
2.00 0.40 10.80 0.40 140.68
2.00 0.80 21.60 0.80 281.36
2.00 0.40 10.80 0.40 140.68
2.00 0.20 5.40 0.20 70.34
20.005.0001
5.00 0.50 9.00 0.50 222.8
5.00 1.00 18.00 1.00 445.6
5.00 2.00 36.00 2.00 891.2
5.00 1.00 18.00 1.00 445.6
5.00 0.50 9.00 0.50 222.8
20.005.0002
2.00 0.20 6.00 0.20 133.718
2.00 0.40 12.00 0.40 267.436
2.00 0.80 24.00 0.80 534.872
2.00 0.40 12.00 0.40 267.436
2.00 0.20 6.00 0.20 133.718
20.005.0005
2.00 0.20 8.40 0.20 118.464
2.00 0.40 16.80 0.40 236.928
2.00 0.80 33.60 0.80 473.856
2.00 0.40 16.80 0.40 236.928
2.00 0.20 8.40 0.20 118.464
20.006.0002
7.00 0.70 37.80 0.70 490.945
7.00 1.40 75.60 1.40 981.89
7.00 2.80 151.20 2.80 1963.78
7.00 1.40 75.60 1.40 981.89
7.00 0.70 37.80 0.70 490.945
20.008.0005
2.00 0.20 1.44 0.20 92.118
2.00 0.40 2.88 0.40 184.236
2.00 0.80 5.76 0.80 368.472
2.00 0.40 2.88 0.40 184.236
2.00 0.20 1.44 0.20 92.118
20.008.0009
1.00 0.10 0.36 0.10 24.401
1.00 0.20 0.72 0.20 48.802
1.00 0.40 1.44 0.40 97.604
1.00 0.20 0.72 0.20 48.802
1.00 0.10 0.36 0.10 24.401
40.002.0001
10.00 1.00 48.00 1.00 646.76
10.00 2.00 96.00 2.00 1293.52
10.00 4.00 192.00 4.00 2587.04
10.00 2.00 96.00 2.00 1293.52
10.00 1.00 48.00 1.00 646.76
40.002.0002
6.00 0.60 32.40 0.60 421.086
6.00 1.20 64.80 1.20 842.172
6.00 2.40 129.60 2.40 1684.344
6.00 1.20 64.80 1.20 842.172
6.00 0.60 32.40 0.60 421.086
40.002.0005
5.00 0.50 30.00 0.50 378.39
5.00 1.00 60.00 1.00 756.78
5.00 2.00 120.00 2.00 1513.56
5.00 1.00 60.00 1.00 756.78
5.00 0.50 30.00 0.50 378.39
50.001.0002
25.00 2.50 60.00 2.50 1072.55
25.00 5.00 120.00 5.00 2145.1
25.00 10.00 240.00 10.00 4290.2
25.00 5.00 120.00 5.00 2145.1
25.00 2.50 60.00 2.50 1072.55
50.001.0003
25.00 2.50 24.00 2.50 305.225
25.00 5.00 48.00 5.00 610.45
25.00 10.00 96.00 10.00 1220.9
25.00 5.00 48.00 5.00 610.45
25.00 2.50 24.00 2.50 305.225
50.001.0005
2.00 0.20 14.40 0.20 171.97
2.00 0.40 28.80 0.40 343.94
2.00 0.80 57.60 0.80 687.88
2.00 0.40 28.80 0.40 343.94
2.00 0.20 14.40 0.20 171.97
60.001.0002
4.00 0.40 4.80 0.40 56.968
4.00 0.80 9.60 0.80 113.936
4.00 1.60 19.20 1.60 227.872
4.00 0.80 9.60 0.80 113.936
4.00 0.40 4.80 0.40 56.968
60.001.0003
2.00 0.20 9.60 0.20 127.682
2.00 0.40 19.20 0.40 255.364
2.00 0.80 38.40 0.80 510.728
2.00 0.40 19.20 0.40 255.364
2.00 0.20 9.60 0.20 127.682
70.002.0001
1.00 0.10 57.60 0.10 4098.816
1.00 0.20 115.20 0.20 8197.632
1.00 0.40 230.40 0.40 16395.264
1.00 0.20 115.20 0.20 8197.632
1.00 0.10 57.60 0.10 4098.816
80.001.0001
16.00 3.20 18.43 3.20 251.04
16.00 9.60 55.30 9.60 753.12
16.00 3.20 18.43 3.20 251.04
80.001.0002
20.00 4.00 16.80 4.00 188.4
20.00 12.00 50.40 12.00 565.2
20.00 4.00 16.80 4.00 188.4

25.002.0001
1,698.00 1,698.00 65.02 108.36 1698.0012 0.02
40.005.0009
8,624.00 8,624.00 430.06 35.00 8624 0.00

20.001.0001
0.00 0.00 0.00 14.55 0
0.00 0.00 0.00 2.91 0
0.00 0.00 0.00 11.64 0
20.001.0002
10.67 5.34 5.34 14.55 61.692
10.67 1.07 1.07 2.91 12.3384
10.67 4.27 4.27 11.64 49.3536
20.001.0101
0.00 0.00 0.00 14.55 0
0.00 0.00 0.00 2.91 0
0.00 0.00 0.00 11.64 0
20.001.0102
11.16 5.58 5.58 14.55 64.602
11.16 1.12 1.12 2.91 12.9204
11.16 4.46 4.46 11.64 51.6816
20.001.0003
0.00 0.00 0.00 11.85 0
0.00 0.00 0.00 2.37 0
0.00 0.00 0.00 9.48 0
20.001.0004
7.45 3.73 3.73 11.85 43.2525
7.45 0.75 0.75 2.37 8.6505
7.45 2.98 2.98 9.48 34.602
20.001.0103
0.00 0.00 0.00 11.85 0
0.00 0.00 0.00 2.37 0
0.00 0.00 0.00 9.48 0
20.001.0104
7.79 3.90 3.90 11.85 45.267
7.79 0.78 0.78 2.37 9.0534
7.79 3.12 3.12 9.48 36.2136
20.002.0001
0.00 0.00 0.00 1,119.50 0
0.00 0.00 0.00 223.90 0
0.00 0.00 0.00 895.60 0
20.002.0002
703.94 351.97 351.97 1,119.50 4086.175
703.94 70.39 70.39 223.90 817.235
703.94 281.58 281.58 895.60 3268.94
30.001.0001
0.00 0.00 0.00 25.00 0
30.001.0002
7.05 0.70 0.70 2.50 6.95
7.05 2.82 2.82 10.00 27.8
7.05 3.52 3.52 12.50 34.75
30.001.0003
0.00 0.00 0.00 25.00 0
30.001.0004
7.05 0.70 0.70 2.50 6.95
7.05 2.82 2.82 10.00 27.8
7.05 3.52 3.52 12.50 34.75
40.001.0002
481.79 144.54 144.54 2,038.61 3771.4248
481.79 72.27 72.27 1,019.30 1885.7124
481.79 72.27 72.27 1,019.30 1885.7124
481.79 192.72 192.72 2,718.14 5028.5664
40.001.0005
511.54 153.46 153.46 2,164.50 4004.325
511.54 76.73 76.73 1,082.25 2002.1625
511.54 76.73 76.73 1,082.25 2002.1625
511.54 204.62 204.62 2,886.00 5339.1
40.001.0009
42.54 12.76 12.76 180.00 333
42.54 6.38 6.38 90.00 166.5
42.54 6.38 6.38 90.00 166.5
42.54 17.02 17.02 240.00 444
40.001.0029
1,233.59 370.08 370.08 5,219.72 9656.48385
1,233.59 185.04 185.04 2,609.86 4828.241925
1,233.59 185.04 185.04 2,609.86 4828.241925
1,233.59 493.44 493.44 6,959.63 12875.3118
40.001.0030
2,478.81 743.64 743.64 10,488.60 19403.91
2,478.81 371.82 371.82 5,244.30 9701.955
2,478.81 371.82 371.82 5,244.30 9701.955
2,478.81 991.52 991.52 13,984.80 25871.88
40.001.0040
584.93 175.48 175.48 2,475.00 4578.75
584.93 87.74 87.74 1,237.50 2289.375
584.93 87.74 87.74 1,237.50 2289.375
584.93 233.97 233.97 3,300.00 6105
40.001.0042
54.59 16.38 16.38 231.00 427.35
54.59 8.19 8.19 115.50 213.675
54.59 8.19 8.19 115.50 213.675
54.59 21.84 21.84 308.00 569.8
40.002.2169
689.96 69.00 69.00 1.79 1196.06472
689.96 137.99 137.99 3.58 2392.12944
689.96 69.00 69.00 1.79 1196.06472
689.96 241.49 241.49 6.26 4186.22652
689.96 69.00 69.00 1.79 1196.06472
689.96 34.50 34.50 0.89 598.03236
689.96 69.00 69.00 1.79 1196.06472
40.002.2805
200.15 20.01 20.01 6.15 1416.714
200.15 40.03 40.03 12.30 2833.428
200.15 90.07 90.07 27.68 6375.213
200.15 20.01 20.01 6.15 1416.714
200.15 10.01 10.01 3.08 708.357
200.15 20.01 20.01 6.15 1416.714
40.002.2809
66.65 6.67 6.67 0.30 125.751
66.65 13.33 13.33 0.60 251.502
66.65 6.67 6.67 0.30 125.751
66.65 23.33 23.33 1.05 440.1285
66.65 6.67 6.67 0.30 125.751
66.65 3.33 3.33 0.15 62.8755
66.65 6.67 6.67 0.30 125.751
40.002.2829
941.87 94.19 94.19 27.25 5891.9475
941.87 188.37 188.37 54.49 11783.895
941.87 94.19 94.19 27.25 5891.9475
941.87 329.65 329.65 95.36 20621.81625
941.87 94.19 94.19 27.25 5891.9475
941.87 47.09 47.09 13.62 2945.97375
941.87 94.19 94.19 27.25 5891.9475
40.002.2830
4,389.65 438.96 438.96 28.65 10151.53912
4,389.65 877.93 877.93 57.31 20303.07824
4,389.65 438.96 438.96 28.65 10151.53912
4,389.65 1,536.38 1,536.38 100.29 35530.38692
4,389.65 438.96 438.96 28.65 10151.53912
4,389.65 219.48 219.48 14.33 5075.76956
4,389.65 438.96 438.96 28.65 10151.53912
40.002.2840
303.43 30.34 30.34 7.32 1620.86574
303.43 60.69 60.69 14.64 3241.73148
303.43 136.54 136.54 32.94 7293.89583
303.43 30.34 30.34 7.32 1620.86574
303.43 15.17 15.17 3.66 810.43287
303.43 30.34 30.34 7.32 1620.86574
40.002.2842
270.04 27.00 27.00 1.45 562.18023
270.04 54.01 54.01 2.91 1124.36046
270.04 121.52 121.52 6.54 2529.811035
270.04 27.00 27.00 1.45 562.18023
270.04 13.50 13.50 0.73 281.090115
270.04 27.00 27.00 1.45 562.18023
60.002.1061
17.02 4.26 4.26 0.95 192.146997589
17.02 5.11 5.11 1.14 230.576397107
17.02 4.26 4.26 0.95 192.146997589
17.02 1.70 1.70 0.38 76.8587990355
17.02 1.70 1.70 0.38 76.8587990355

10.005.0003
26.00 20.80 62.40 20.80 651.823249997
26.00 5.20 15.60 5.20 162.955812499

10.001.0003
2.90 0.29 26.10 0.29 274.581838539
2.90 1.74 156.60 1.74 1647.49103124
2.90 0.87 78.30 0.87 823.745515618
10.001.0103
6.70 0.67 48.24 0.67 510.470391256
6.70 4.02 289.44 4.02 3062.82234753
6.70 2.01 144.72 2.01 1531.41117377
10.001.0203
4.50 0.45 27.00 0.45 284.759909583
4.50 2.70 162.00 2.70 1708.5594575
4.50 1.35 81.00 1.35 854.279728749
10.005.0003
20.00 16.00 48.00 16.00 501.402499998
20.00 4.00 12.00 4.00 125.350624999
10.006.0003
0.50 0.40 38.40 0.40 401.473994903
0.50 0.10 9.60 0.10 100.368498726
10.009.0003
0.50 0.40 31.20 0.40 326.251376643
0.50 0.10 7.80 0.10 81.5628441608
10.009.0103
0.50 0.40 24.00 0.40 250.962597418
0.50 0.10 6.00 0.10 62.7406493545
10.009.0203
0.50 0.40 19.20 0.40 200.383129912
0.50 0.10 4.80 0.10 50.095782478

10.001.2001
10.001.20010 0.00 0.00 0.00 0
10.001.20010 0.00 0.00 0.00 0
10.001.20010 0.00 0.00 0.00 0
10.002.2003
10.002.20030 0.00 0.00 0.00 0
10.002.20030 0.00 0.00 0.00 0
10.002.20030 0.00 0.00 0.00 0

25.004.0001
109,669.42 109,669.42 2,034.34 18,494.00 109669.42 0.00
25.007.0001
169,749.18 169,749.18 2,750.94 16,182.00 169749.18 0.00
25.007.0002
192,804.12 192,804.12 3,814.47 11,559.00 192804.12 0.03
30.001.0004
5,880.30 5,880.30 358.70 170.00 5880.3 0.03
30.004.0002
3,220,323.48 3,220,323.48 66,656.36 271,071.00 3220323.48 0.03
30.004.0003
826,881.20 826,881.20 17,420.25 116,135.00 826881.2 0.01
30.007.0001
3,187.92 3,187.92 86.16 2,154.00 3187.92 0.00
30.007.0002
149,291.67 149,291.67 2,567.67 36,681.00 149291.67 0.00
40.002.0001
3,743.57 3,743.57 90.44 323.00 3743.57 0.01
40.007.0002
5,760.85 5,760.85 358.15 145.00 5760.85 0.13

25.001.0001
9,572.42 9,572.42 287.84 669.40 9572.42 0.02
25.001.0002
900.90 900.90 27.09 63.00 900.90 0.02
25.003.0001
17,598.55 17,598.55 1,309.77 793.80 17598.55 0.13
25.003.0002
5,579.57 5,579.57 606.12 135.30 5579.57 0.40
25.003.0003
3,396.11 3,396.11 368.93 82.35 3396.11 0.40
30.002.0001
19,076.76 19,076.76 1,178.07 669.36 19076.76 0.13
30.002.0002
1,795.50 1,795.50 110.88 63.00 1795.50 0.13
30.003.0004
41,293.48 41,293.48 2,786.24 793.80 41293.48 0.33
30.003.0005
7,465.59 7,465.59 483.00 135.30 7465.59 0.34
30.003.0006
4,544.07 4,544.07 293.99 82.35 4544.07 0.34

20.001.0001
0.00 0.00 0.00 89.73 0
0.00 0.00 0.00 17.95 0
0.00 0.00 0.00 71.78 0
20.001.0002
65.82 32.91 32.91 89.73 380.434
65.82 6.58 6.58 17.95 76.0868
65.82 26.33 26.33 71.78 304.3472
20.001.0101
0.00 0.00 0.00 89.73 0
0.00 0.00 0.00 17.95 0
0.00 0.00 0.00 71.78 0
20.001.0102
68.80 34.40 34.40 89.73 398.379
68.80 6.88 6.88 17.95 79.6758
68.80 27.52 27.52 71.78 318.7032
20.001.0003
0.00 0.00 0.00 73.08 0
0.00 0.00 0.00 14.62 0
0.00 0.00 0.00 58.46 0
20.001.0004
45.95 22.97 22.97 73.08 266.72375
45.95 4.59 4.59 14.62 53.34475
45.95 18.38 18.38 58.46 213.379
20.001.0103
0.00 0.00 0.00 73.08 0
0.00 0.00 0.00 14.62 0
0.00 0.00 0.00 58.46 0
20.001.0104
48.04 24.02 24.02 73.08 279.1465
48.04 4.80 4.80 14.62 55.8293
48.04 19.22 19.22 58.46 223.3172
20.002.0001
0.00 0.00 0.00 375.00 0
0.00 0.00 0.00 75.00 0
0.00 0.00 0.00 300.00 0
20.002.0002
235.80 117.90 117.90 375.00 1368.75
235.80 23.58 23.58 75.00 273.75
235.80 94.32 94.32 300.00 1095
40.001.0001
124.78 37.44 37.44 528.00 976.8
124.78 18.72 18.72 264.00 488.4
124.78 18.72 18.72 264.00 488.4
124.78 49.91 49.91 704.00 1302.4
40.001.0003
105.29 31.59 31.59 445.50 824.175
105.29 15.79 15.79 222.75 412.0875
105.29 15.79 15.79 222.75 412.0875
105.29 42.11 42.11 594.00 1098.9
40.001.0005
808.26 242.48 242.48 3,420.00 6327
808.26 121.24 121.24 1,710.00 3163.5
808.26 121.24 121.24 1,710.00 3163.5
808.26 323.30 323.30 4,560.00 8436
40.001.0009
31.91 9.57 9.57 135.00 249.75
31.91 4.79 4.79 67.50 124.875
31.91 4.79 4.79 67.50 124.875
31.91 12.76 12.76 180.00 333
40.001.0010
276.51 82.95 82.95 1,170.00 2164.5
276.51 41.48 41.48 585.00 1082.25
276.51 41.48 41.48 585.00 1082.25
276.51 110.60 110.60 1,560.00 2886
40.001.0020
478.58 143.57 143.57 2,025.00 3746.25
478.58 71.79 71.79 1,012.50 1873.125
478.58 71.79 71.79 1,012.50 1873.125
478.58 191.43 191.43 2,700.00 4995
40.001.0021
393.50 118.05 118.05 1,665.00 3080.25
393.50 59.02 59.02 832.50 1540.125
393.50 59.02 59.02 832.50 1540.125
393.50 157.40 157.40 2,220.00 4107
40.001.0022
374.35 112.31 112.31 1,584.00 2930.4
374.35 56.15 56.15 792.00 1465.2
374.35 56.15 56.15 792.00 1465.2
374.35 149.74 149.74 2,112.00 3907.2
40.001.0026
816.77 245.03 245.03 3,456.00 6393.6
816.77 122.52 122.52 1,728.00 3196.8
816.77 122.52 122.52 1,728.00 3196.8
816.77 326.71 326.71 4,608.00 8524.8
40.001.0064
318.34 95.50 95.50 1,347.00 2491.95008469
318.34 47.75 47.75 673.50 1245.97504234
318.34 47.75 47.75 673.50 1245.97504234
318.34 127.34 127.34 1,796.00 3322.60011292
40.001.0069
239.80 71.94 71.94 1,014.65 1877.09882117
239.80 35.97 35.97 507.32 938.549410586
239.80 35.97 35.97 507.32 938.549410586
239.80 95.92 95.92 1,352.86 2502.79842823
40.002.2169
679.16 67.92 67.92 1.76 1177.33442552
679.16 135.83 135.83 3.52 2354.66885104
679.16 67.92 67.92 1.76 1177.33442552
679.16 237.71 237.71 6.16 4120.67048931
679.16 67.92 67.92 1.76 1177.33442552
679.16 33.96 33.96 0.88 588.667212759
679.16 67.92 67.92 1.76 1177.33442552
40.002.2801
260.60 26.06 26.06 1.62 596.70632
260.60 52.12 52.12 3.25 1193.41264
260.60 117.27 117.27 7.31 2685.17844
260.60 26.06 26.06 1.62 596.70632
260.60 13.03 13.03 0.81 298.35316
260.60 26.06 26.06 1.62 596.70632
40.002.2803
164.88 16.49 16.49 1.35 422.145
164.88 32.98 32.98 2.70 844.29
164.88 74.20 74.20 6.08 1899.6525
164.88 16.49 16.49 1.35 422.145
164.88 8.24 8.24 0.68 211.0725
164.88 16.49 16.49 1.35 422.145
40.002.2805
369.05 36.90 36.90 11.34 2612.2824
369.05 73.81 73.81 22.68 5224.5648
369.05 166.07 166.07 51.03 11755.2708
369.05 36.90 36.90 11.34 2612.2824
369.05 18.45 18.45 5.67 1306.1412
369.05 36.90 36.90 11.34 2612.2824
40.002.2809
411.03 41.10 41.10 1.85 775.4645
411.03 82.21 82.21 3.70 1550.929
411.03 41.10 41.10 1.85 775.4645
411.03 143.86 143.86 6.48 2714.12575
411.03 41.10 41.10 1.85 775.4645
411.03 20.55 20.55 0.93 387.73225
411.03 41.10 41.10 1.85 775.4645
40.002.2810
275.82 27.58 27.58 2.62 764.7518
275.82 55.16 55.16 5.24 1529.5036
275.82 27.58 27.58 2.62 764.7518
275.82 96.54 96.54 9.17 2676.6313
275.82 27.58 27.58 2.62 764.7518
275.82 13.79 13.79 1.31 382.3759
275.82 27.58 27.58 2.62 764.7518
40.002.2820
833.81 83.38 83.38 4.53 1735.05583
833.81 166.76 166.76 9.06 3470.11166
833.81 83.38 83.38 4.53 1735.05583
833.81 291.83 291.83 15.86 6072.695405
833.81 83.38 83.38 4.53 1735.05583
833.81 41.69 41.69 2.27 867.527915
833.81 83.38 83.38 4.53 1735.05583
40.002.2821
689.17 68.92 68.92 3.74 1952.60832
689.17 137.83 137.83 7.49 3905.21664
689.17 68.92 68.92 3.74 1952.60832
689.17 241.21 241.21 13.10 6834.12912
689.17 68.92 68.92 3.74 1952.60832
689.17 34.46 34.46 1.87 976.30416
689.17 68.92 68.92 3.74 1952.60832
40.002.2822
422.53 42.25 42.25 4.37 2012.38128
422.53 84.51 84.51 8.74 4024.76256
422.53 42.25 42.25 4.37 2012.38128
422.53 147.88 147.88 15.29 7043.33448
422.53 42.25 42.25 4.37 2012.38128
422.53 21.13 21.13 2.18 1006.19064
422.53 42.25 42.25 4.37 2012.38128
40.002.2826
2,546.52 254.65 254.65 9.58 4704.43848
2,546.52 509.30 509.30 19.16 9408.87696
2,546.52 254.65 254.65 9.58 4704.43848
2,546.52 891.28 891.28 33.53 16465.53468
2,546.52 254.65 254.65 9.58 4704.43848
2,546.52 127.33 127.33 4.79 2352.21924
2,546.52 254.65 254.65 9.58 4704.43848
40.002.1564
2,123.96 212.40 212.40 11.66 4114.82592
2,123.96 424.79 424.79 23.33 8229.65184
2,123.96 318.59 318.59 17.50 6172.23888
2,123.96 637.19 637.19 34.99 12344.47776
2,123.96 212.40 212.40 11.66 4114.82592
2,123.96 106.20 106.20 5.83 2057.41296
2,123.96 212.40 212.40 11.66 4114.82592
40.002.1565
68.24 6.82 6.82 3.24 616.096368
68.24 13.65 13.65 6.49 1232.192736
68.24 6.82 6.82 3.24 616.096368
68.24 23.89 23.89 11.36 2156.337288
68.24 6.82 6.82 3.24 616.096368
68.24 3.41 3.41 1.62 308.048184
68.24 6.82 6.82 3.24 616.096368
60.002.1061
16.57 4.14 4.14 0.92 187.090496383
16.57 4.97 4.97 1.11 224.50859566
16.57 4.14 4.14 0.92 187.090496383
16.57 1.66 1.66 0.37 74.8361985533
16.57 1.66 1.66 0.37 74.8361985533
60.002.1062
82.80 20.70 20.70 9.00 1595.61
82.80 24.84 24.84 10.80 1914.732
82.80 20.70 20.70 9.00 1595.61
82.80 8.28 8.28 3.60 638.244
82.80 8.28 8.28 3.60 638.244

10.001.0003
4.10 0.41 36.90 0.41 388.201909659
4.10 2.46 221.40 2.46 2329.21145795
4.10 1.23 110.70 1.23 1164.60572898
10.001.0103
13.40 1.34 96.48 1.34 1020.94078251
13.40 8.04 578.88 8.04 6125.64469507
13.40 4.02 289.44 4.02 3062.82234753

20.001.0003
8,064.00 806.40 806.40 140.00 12415.2 0.00
8,064.00 5,644.80 5,644.80 980.00 86906.4
8,064.00 1,612.80 1,612.80 280.00 24830.4
20.001.0005
4,128.00 412.80 412.80 80.00 6555.2
4,128.00 2,889.60 2,889.60 560.00 45886.4
4,128.00 825.60 825.60 160.00 13110.4
20.001.0006
1,980.00 198.00 198.00 50.00 3325
1,980.00 1,386.00 1,386.00 350.00 23275
1,980.00 396.00 396.00 100.00 6650
20.001.0026
3,456.00 345.60 345.60 80.00 5972.8
3,456.00 2,419.20 2,419.20 560.00 41809.6
3,456.00 691.20 691.20 160.00 11945.6
20.002.0002
11,587.80 1,158.78 1,158.78 623.00 16372.44
11,587.80 8,111.46 8,111.46 4,361.00 114607.08
11,587.80 2,317.56 2,317.56 1,246.00 32744.88
20.002.0003
129.60 12.96 12.96 6.00 182.58
129.60 90.72 90.72 42.00 1278.06
129.60 25.92 25.92 12.00 365.16
20.002.0004
216.00 21.60 21.60 9.00 297.99
216.00 151.20 151.20 63.00 2085.93
216.00 43.20 43.20 18.00 595.98
20.002.0005
120.00 12.00 12.00 4.00 164.36
120.00 84.00 84.00 28.00 1150.52
120.00 24.00 24.00 8.00 328.72
20.002.0006
108.00 10.80 10.80 3.00 144.39
108.00 75.60 75.60 21.00 1010.73
108.00 21.60 21.60 6.00 288.78
20.002.0007
84.00 8.40 8.40 2.00 111.4
84.00 58.80 58.80 14.00 779.8
84.00 16.80 16.80 4.00 222.8
20.002.0032
312.00 31.20 31.20 40.00 665.2
312.00 218.40 218.40 280.00 4656.4
312.00 62.40 62.40 80.00 1330.4
20.002.0043
504.00 50.40 50.40 60.00 648
504.00 352.80 352.80 420.00 4536
504.00 100.80 100.80 120.00 1296
20.002.0057
1,080.00 108.00 108.00 40.00 1348.4
1,080.00 756.00 756.00 280.00 9438.8
1,080.00 216.00 216.00 80.00 2696.8
20.002.0058
2,230.80 223.08 223.08 55.00 2780.25
2,230.80 1,561.56 1,561.56 385.00 19461.75
2,230.80 446.16 446.16 110.00 5560.5
30.001.1103
309.12 30.91 30.91 56.00 419.44
309.12 216.38 216.38 392.00 2936.08
309.12 61.82 61.82 112.00 838.88
30.001.3103
46.92 4.69 4.69 8.50 65.62
46.92 32.84 32.84 59.50 459.34
46.92 9.38 9.38 17.00 131.24
30.001.3305
36.43 3.64 3.64 4.60 49.404
36.43 25.50 25.50 32.20 345.828
36.43 7.29 7.29 9.20 98.808
30.001.3306
23.76 2.38 2.38 4.40 32.208
23.76 16.63 16.63 30.80 225.456
23.76 4.75 4.75 8.80 64.416
30.001.3310
9.00 0.90 0.90 2.50 12.925
9.00 6.30 6.30 17.50 90.475
9.00 1.80 1.80 5.00 25.85
30.001.3311
12.96 1.30 1.30 4.00 17.56
12.96 9.07 9.07 28.00 122.92
12.96 2.59 2.59 8.00 35.12
30.001.6102
354.00 35.40 35.40 50.00 480
354.00 247.80 247.80 350.00 3360
354.00 70.80 70.80 100.00 960
30.001.6104
56.16 5.62 5.62 12.00 76.2
56.16 39.31 39.31 84.00 533.4
56.16 11.23 11.23 24.00 152.4
30.001.6305
19.50 1.95 1.95 2.50 26.45
19.50 13.65 13.65 17.50 185.15
19.50 3.90 3.90 5.00 52.9
30.001.6306
11.35 1.14 1.14 2.20 15.4
11.35 7.95 7.95 15.40 107.8
11.35 2.27 2.27 4.40 30.8
30.001.6307
10.30 1.03 1.03 2.20 13.97
10.30 7.21 7.21 15.40 97.79
10.30 2.06 2.06 4.40 27.94
30.001.6309
7.66 0.77 0.77 2.20 10.384
7.66 5.36 5.36 15.40 72.688
7.66 1.53 1.53 4.40 20.768
30.001.6313
4.32 0.43 0.43 1.80 5.958
4.32 3.02 3.02 12.60 41.706
4.32 0.86 0.86 3.60 11.916
30.001.6314
47.88 4.79 4.79 21.00 65.31
47.88 33.52 33.52 147.00 457.17
47.88 9.58 9.58 42.00 130.62
30.001.6409
47.52 4.75 4.75 12.00 64.8
47.52 33.26 33.26 84.00 453.6
47.52 9.50 9.50 24.00 129.6
30.001.6410
24.48 2.45 2.45 6.80 33.524
24.48 17.14 17.14 47.60 234.668
24.48 4.90 4.90 13.60 67.048
30.001.6411
7.78 0.78 0.78 2.40 10.68
7.78 5.44 5.44 16.80 74.76
7.78 1.56 1.56 4.80 21.36
30.001.6412
39.00 3.90 3.90 13.00 53.17
39.00 27.30 27.30 91.00 372.19
39.00 7.80 7.80 26.00 106.34
30.001.6413
30.36 3.04 3.04 11.00 41.14
30.36 21.25 21.25 77.00 287.98
30.36 6.07 6.07 22.00 82.28
30.001.6414
73.08 7.31 7.31 29.00 99.18
73.08 51.16 51.16 203.00 694.26
73.08 14.62 14.62 58.00 198.36
30.001.6511
19.98 2.00 2.00 4.50 27.945
19.98 13.99 13.99 31.50 195.615
19.98 4.00 4.00 9.00 55.89
30.001.6513
35.64 3.56 3.56 9.00 48.33
35.64 24.95 24.95 63.00 338.31
35.64 7.13 7.13 18.00 96.66
30.001.6514
74.40 7.44 7.44 20.00 101
74.40 52.08 52.08 140.00 707
74.40 14.88 14.88 40.00 202
30.001.7002
7.20 0.72 0.72 4.00 9.76
7.20 5.04 5.04 28.00 68.32
7.20 1.44 1.44 8.00 19.52
30.001.7012
110.40 11.04 11.04 46.00 151.8
110.40 77.28 77.28 322.00 1062.6
110.40 22.08 22.08 92.00 303.6
30.001.8011
34.32 3.43 3.43 13.00 47.58
34.32 24.02 24.02 91.00 333.06
34.32 6.86 6.86 26.00 95.16
30.001.8012
39.00 3.90 3.90 13.00 53.95
39.00 27.30 27.30 91.00 377.65
39.00 7.80 7.80 26.00 107.9
30.001.9113
151.20 15.12 15.12 90.00 208.8
151.20 105.84 105.84 630.00 1461.6
151.20 30.24 30.24 180.00 417.6
30.001.9114
319.20 31.92 31.92 190.00 450.3
319.20 223.44 223.44 1,330.00 3152.1
319.20 63.84 63.84 380.00 900.6
30.002.1103
72.24 7.22 7.22 14.00 96.6
72.24 50.57 50.57 98.00 676.2
72.24 14.45 14.45 28.00 193.2
30.002.1306
46.80 4.68 4.68 10.00 63.5
46.80 32.76 32.76 70.00 444.5
46.80 9.36 9.36 20.00 127
30.002.1307
25.92 2.59 2.59 6.00 36.48
25.92 18.14 18.14 42.00 255.36
25.92 5.18 5.18 12.00 72.96
30.002.1405
3,120.00 312.00 312.00 400.00 4232
3,120.00 2,184.00 2,184.00 2,800.00 29624
3,120.00 624.00 624.00 800.00 8464
30.002.3103
394.74 39.47 39.47 76.50 532.44
394.74 276.32 276.32 535.50 3727.08
394.74 78.95 78.95 153.00 1064.88
30.002.3105
19.50 1.95 1.95 2.50 26.625
19.50 13.65 13.65 17.50 186.375
19.50 3.90 3.90 5.00 53.25
30.002.3305
293.11 29.31 29.31 41.40 397.44
293.11 205.18 205.18 289.80 2782.08
293.11 58.62 58.62 82.80 794.88
30.002.3306
185.33 18.53 18.53 39.60 251.46
185.33 129.73 129.73 277.20 1760.22
185.33 37.07 37.07 79.20 502.92
30.002.3310
64.80 6.48 6.48 22.50 91.575
64.80 45.36 45.36 157.50 641.025
64.80 12.96 12.96 45.00 183.15
30.002.3311
95.04 9.50 9.50 36.00 128.88
95.04 66.53 66.53 252.00 902.16
95.04 19.01 19.01 72.00 257.76
30.002.6102
2,322.00 232.20 232.20 450.00 3141
2,322.00 1,625.40 1,625.40 3,150.00 21987
2,322.00 464.40 464.40 900.00 6282
30.002.6104
362.88 36.29 36.29 108.00 492.48
362.88 254.02 254.02 756.00 3447.36
362.88 72.58 72.58 216.00 984.96
30.002.6305
132.30 13.23 13.23 22.50 179.325
132.30 92.61 92.61 157.50 1255.275
132.30 26.46 26.46 45.00 358.65
30.002.6306
87.91 8.79 8.79 19.80 117.81
87.91 61.54 61.54 138.60 824.67
87.91 17.58 17.58 39.60 235.62
30.002.6307
80.78 8.08 8.08 19.80 109.494
80.78 56.55 56.55 138.60 766.458
80.78 16.16 16.16 39.60 218.988
30.002.6309
57.02 5.70 5.70 19.80 77.418
57.02 39.92 39.92 138.60 541.926
57.02 11.40 11.40 39.60 154.836
30.002.6312
204.00 20.40 20.40 100.00 291
204.00 142.80 142.80 700.00 2037
204.00 40.80 40.80 200.00 582
30.002.6313
27.22 2.72 2.72 16.20 36.288
27.22 19.05 19.05 113.40 254.016
27.22 5.44 5.44 32.40 72.576
30.002.6314
341.64 34.16 34.16 219.00 473.04
341.64 239.15 239.15 1,533.00 3311.28
341.64 68.33 68.33 438.00 946.08
30.002.6315
288.00 28.80 28.80 200.00 402
288.00 201.60 201.60 1,400.00 2814
288.00 57.60 57.60 400.00 804
30.002.6409
336.96 33.70 33.70 108.00 452.52
336.96 235.87 235.87 756.00 3167.64
336.96 67.39 67.39 216.00 905.04
30.002.6410
176.26 17.63 17.63 61.20 235.62
176.26 123.38 123.38 428.40 1649.34
176.26 35.25 35.25 122.40 471.24
30.002.6411
57.02 5.70 5.70 21.60 76.896
57.02 39.92 39.92 151.20 538.272
57.02 11.40 11.40 43.20 153.792
30.002.6412
280.80 28.08 28.08 117.00 377.91
280.80 196.56 196.56 819.00 2645.37
280.80 56.16 56.16 234.00 755.82
30.002.6413
190.08 19.01 19.01 99.00 258.39
190.08 133.06 133.06 693.00 1808.73
190.08 38.02 38.02 198.00 516.78
30.002.6414
469.80 46.98 46.98 261.00 636.84
469.80 328.86 328.86 1,827.00 4457.88
469.80 93.96 93.96 522.00 1273.68
30.002.6511
121.50 12.15 12.15 40.50 166.455
121.50 85.05 85.05 283.50 1165.185
121.50 24.30 24.30 81.00 332.91
30.002.6513
194.40 19.44 19.44 81.00 259.2
194.40 136.08 136.08 567.00 1814.4
194.40 38.88 38.88 162.00 518.4
30.002.6514
410.40 41.04 41.04 180.00 550.8
410.40 287.28 287.28 1,260.00 3855.6
410.40 82.08 82.08 360.00 1101.6
30.002.7002
64.80 6.48 6.48 36.00 87.12
64.80 45.36 45.36 252.00 609.84
64.80 12.96 12.96 72.00 174.24
30.002.7012
993.60 99.36 99.36 414.00 1353.78
993.60 695.52 695.52 2,898.00 9476.46
993.60 198.72 198.72 828.00 2707.56
30.002.7021
960.00 96.00 96.00 1,000.00 1320
960.00 672.00 672.00 7,000.00 9240
960.00 192.00 192.00 2,000.00 2640
30.002.7022
312.00 31.20 31.20 200.00 430
312.00 218.40 218.40 1,400.00 3010
312.00 62.40 62.40 400.00 860
30.002.7221
96.00 9.60 9.60 100.00 131
96.00 67.20 67.20 700.00 917
96.00 19.20 19.20 200.00 262
30.002.7331
9.60 0.96 0.96 4.00 12.88
9.60 6.72 6.72 28.00 90.16
9.60 1.92 1.92 8.00 25.76
30.002.7334
280.80 28.08 28.08 117.00 383.76
280.80 196.56 196.56 819.00 2686.32
280.80 56.16 56.16 234.00 767.52
30.002.7338
322.92 32.29 32.29 117.00 442.26
322.92 226.04 226.04 819.00 3095.82
322.92 64.58 64.58 234.00 884.52
30.002.8101
300.00 30.00 30.00 100.00 414
300.00 210.00 210.00 700.00 2898
300.00 60.00 60.00 200.00 828
30.002.8102
240.00 24.00 24.00 100.00 332
240.00 168.00 168.00 700.00 2324
240.00 48.00 48.00 200.00 664
30.002.8300
105.60 10.56 10.56 40.00 144
105.60 73.92 73.92 280.00 1008
105.60 21.12 21.12 80.00 288
30.002.9114
884.40 88.44 88.44 670.00 1226.1
884.40 619.08 619.08 4,690.00 8582.7
884.40 176.88 176.88 1,340.00 2452.2
40.001.0001
1,360.80 136.08 136.08 90.00 1903.5
1,360.80 952.56 952.56 630.00 13324.5
1,360.80 272.16 272.16 180.00 3807
40.001.0002
113.40 11.34 11.34 35.00 156.8
113.40 79.38 79.38 245.00 1097.6
113.40 22.68 22.68 70.00 313.6
40.002.0001
54.00 5.40 5.40 10.00 75.9
54.00 37.80 37.80 70.00 531.3
54.00 10.80 10.80 20.00 151.8
40.002.0002
84.00 8.40 8.40 25.00 117.75
84.00 58.80 58.80 175.00 824.25
84.00 16.80 16.80 50.00 235.5
40.002.0003
360.00 36.00 36.00 200.00 498
360.00 252.00 252.00 1,400.00 3486
360.00 72.00 72.00 400.00 996
40.003.0001
19.20 1.92 1.92 0.20 60.388
19.20 13.44 13.44 1.40 422.716
19.20 3.84 3.84 0.40 120.776
40.004.0001
1,008.00 100.80 100.80 1.20 2305.716
1,008.00 705.60 705.60 8.40 16140.012
1,008.00 201.60 201.60 2.40 4611.432
40.005.0001
1,296.00 129.60 129.60 60.00 3702.6
1,296.00 907.20 907.20 420.00 25918.2
1,296.00 259.20 259.20 120.00 7405.2
40.006.0004
84.00 8.40 8.40 0.20 256.824
84.00 58.80 58.80 1.40 1797.768
84.00 16.80 16.80 0.40 513.648
40.006.0005
60.00 6.00 6.00 0.50 310.22
60.00 42.00 42.00 3.50 2171.54
60.00 12.00 12.00 1.00 620.44
50.001.1123
36.00 3.60 3.60 0.10 129.902
36.00 18.00 18.00 0.50 649.51
36.00 7.20 7.20 0.20 259.804
36.00 7.20 7.20 0.20 259.804
50.001.1406
72.00 7.20 7.20 0.20 259.804
72.00 36.00 36.00 1.00 1299.02
72.00 14.40 14.40 0.40 519.608
72.00 14.40 14.40 0.40 519.608
50.001.1407
36.00 3.60 3.60 0.10 129.905
36.00 18.00 18.00 0.50 649.525
36.00 7.20 7.20 0.20 259.81
36.00 7.20 7.20 0.20 259.81
50.001.3103
432.00 43.20 43.20 1.20 559.2
432.00 216.00 216.00 6.00 2796
432.00 86.40 86.40 2.40 1118.4
432.00 86.40 86.40 2.40 1118.4
50.001.3105
120.00 12.00 12.00 0.40 159.7
120.00 60.00 60.00 2.00 798.5
120.00 24.00 24.00 0.80 319.4
120.00 24.00 24.00 0.80 319.4
50.001.3405
120.00 12.00 12.00 0.40 159.7
120.00 60.00 60.00 2.00 798.5
120.00 24.00 24.00 0.80 319.4
120.00 24.00 24.00 0.80 319.4
50.001.3406
60.00 6.00 6.00 0.20 79.85
60.00 30.00 30.00 1.00 399.25
60.00 12.00 12.00 0.40 159.7
60.00 12.00 12.00 0.40 159.7
50.001.3410
48.00 4.80 4.80 0.20 66.5
48.00 24.00 24.00 1.00 332.5
48.00 9.60 9.60 0.40 133
48.00 9.60 9.60 0.40 133
50.001.3411
96.00 9.60 9.60 0.40 132.992
96.00 48.00 48.00 2.00 664.96
96.00 19.20 19.20 0.80 265.984
96.00 19.20 19.20 0.80 265.984
50.001.6102
120.00 12.00 12.00 5.00 133.55
120.00 60.00 60.00 25.00 667.75
120.00 24.00 24.00 10.00 267.1
120.00 24.00 24.00 10.00 267.1
50.001.6104
12.96 1.30 1.30 0.60 14.424
12.96 6.48 6.48 3.00 72.12
12.96 2.59 2.59 1.20 28.848
12.96 2.59 2.59 1.20 28.848
50.001.6305
10.80 1.08 1.08 0.60 12.018
10.80 5.40 5.40 3.00 60.09
10.80 2.16 2.16 1.20 24.036
10.80 2.16 2.16 1.20 24.036
50.001.6306
5.76 0.58 0.58 0.40 6.412
5.76 2.88 2.88 2.00 32.06
5.76 1.15 1.15 0.80 12.824
5.76 1.15 1.15 0.80 12.824
50.001.6307
5.76 0.58 0.58 0.40 6.412
5.76 2.88 2.88 2.00 32.06
5.76 1.15 1.15 0.80 12.824
5.76 1.15 1.15 0.80 12.824
50.001.6309
4.80 0.48 0.48 0.40 5.34
4.80 2.40 2.40 2.00 26.7
4.80 0.96 0.96 0.80 10.68
4.80 0.96 0.96 0.80 10.68
50.001.6312
25.20 2.52 2.52 3.50 28.035
25.20 12.60 12.60 17.50 140.175
25.20 5.04 5.04 7.00 56.07
25.20 5.04 5.04 7.00 56.07
50.001.6313
9.60 0.96 0.96 1.60 10.688
9.60 4.80 4.80 8.00 53.44
9.60 1.92 1.92 3.20 21.376
9.60 1.92 1.92 3.20 21.376
50.001.6314
12.48 1.25 1.25 2.60 13.884
12.48 6.24 6.24 13.00 69.42
12.48 2.50 2.50 5.20 27.768
12.48 2.50 2.50 5.20 27.768
50.001.6315
28.80 2.88 2.88 6.00 32.04
28.80 14.40 14.40 30.00 160.2
28.80 5.76 5.76 12.00 64.08
28.80 5.76 5.76 12.00 64.08
50.001.6409
28.80 2.88 2.88 2.00 32.04
28.80 14.40 14.40 10.00 160.2
28.80 5.76 5.76 4.00 64.08
28.80 5.76 5.76 4.00 64.08
50.001.6410
28.80 2.88 2.88 2.00 32.04
28.80 14.40 14.40 10.00 160.2
28.80 5.76 5.76 4.00 64.08
28.80 5.76 5.76 4.00 64.08
50.001.6411
8.16 0.82 0.82 0.80 9.08
8.16 4.08 4.08 4.00 45.4
8.16 1.63 1.63 1.60 18.16
8.16 1.63 1.63 1.60 18.16
50.001.6412
25.92 2.59 2.59 3.00 28.83
25.92 12.96 12.96 15.00 144.15
25.92 5.18 5.18 6.00 57.66
25.92 5.18 5.18 6.00 57.66
50.001.6413
14.40 1.44 1.44 2.00 16.02
14.40 7.20 7.20 10.00 80.1
14.40 2.88 2.88 4.00 32.04
14.40 2.88 2.88 4.00 32.04
50.001.6414
21.60 2.16 2.16 4.00 24.04
21.60 10.80 10.80 20.00 120.2
21.60 4.32 4.32 8.00 48.08
21.60 4.32 4.32 8.00 48.08
50.001.6511
7.20 0.72 0.72 0.60 8.01
7.20 3.60 3.60 3.00 40.05
7.20 1.44 1.44 1.20 16.02
7.20 1.44 1.44 1.20 16.02
50.001.6513
43.20 4.32 4.32 4.00 48.08
43.20 21.60 21.60 20.00 240.4
43.20 8.64 8.64 8.00 96.16
43.20 8.64 8.64 8.00 96.16
50.001.6514
76.80 7.68 7.68 8.00 85.44
76.80 38.40 38.40 40.00 427.2
76.80 15.36 15.36 16.00 170.88
76.80 15.36 15.36 16.00 170.88
50.001.7002
5.76 0.58 0.58 0.60 6.408
5.76 2.88 2.88 3.00 32.04
5.76 1.15 1.15 1.20 12.816
5.76 1.15 1.15 1.20 12.816
50.001.7012
67.20 6.72 6.72 7.00 74.76
67.20 33.60 33.60 35.00 373.8
67.20 13.44 13.44 14.00 149.52
67.20 13.44 13.44 14.00 149.52
50.001.7021
86.40 8.64 8.64 24.00 96.24
86.40 43.20 43.20 120.00 481.2
86.40 17.28 17.28 48.00 192.48
86.40 17.28 17.28 48.00 192.48
50.001.7022
75.60 7.56 7.56 9.00 84.15
75.60 37.80 37.80 45.00 420.75
75.60 15.12 15.12 18.00 168.3
75.60 15.12 15.12 18.00 168.3
50.001.7026
28.80 2.88 2.88 1.60 32.048
28.80 14.40 14.40 8.00 160.24
28.80 5.76 5.76 3.20 64.096
28.80 5.76 5.76 3.20 64.096
50.001.7221
16.80 1.68 1.68 7.00 18.69
16.80 8.40 8.40 35.00 93.45
16.80 3.36 3.36 14.00 37.38
16.80 3.36 3.36 14.00 37.38
50.001.7331
5.76 0.58 0.58 1.60 6.416
5.76 2.88 2.88 8.00 32.08
5.76 1.15 1.15 3.20 12.832
5.76 1.15 1.15 3.20 12.832
50.001.7334
15.36 1.54 1.54 1.60 17.088
15.36 7.68 7.68 8.00 85.44
15.36 3.07 3.07 3.20 34.176
15.36 3.07 3.07 3.20 34.176
50.001.7338
28.80 2.88 2.88 1.60 32.048
28.80 14.40 14.40 8.00 160.24
28.80 5.76 5.76 3.20 64.096
28.80 5.76 5.76 3.20 64.096
50.001.8101
21.00 2.10 2.10 3.50 23.38
21.00 10.50 10.50 17.50 116.9
21.00 4.20 4.20 7.00 46.76
21.00 4.20 4.20 7.00 46.76
50.001.8102
44.40 4.44 4.44 7.40 49.432
44.40 22.20 22.20 37.00 247.16
44.40 8.88 8.88 14.80 98.864
44.40 8.88 8.88 14.80 98.864
50.001.8300
3.60 0.36 0.36 0.60 4.008
3.60 1.80 1.80 3.00 20.04
3.60 0.72 0.72 1.20 8.016
3.60 0.72 0.72 1.20 8.016
50.001.9114
432.00 43.20 43.20 180.00 480.6
432.00 216.00 216.00 900.00 2403
432.00 86.40 86.40 360.00 961.2
432.00 86.40 86.40 360.00 961.2
60.002.0002
193.20 19.32 19.32 2.30 367.954
193.20 135.24 135.24 16.10 2575.678
193.20 38.64 38.64 4.60 735.908
60.002.0004
64.80 6.48 6.48 0.60 192.204
64.80 45.36 45.36 4.20 1345.428
64.80 12.96 12.96 1.20 384.408
60.002.0005
36.00 3.60 3.60 0.60 81.084
36.00 25.20 25.20 4.20 567.588
36.00 7.20 7.20 1.20 162.168
60.005.0004
504.00 50.40 50.40 6.00 1276.92
504.00 352.80 352.80 42.00 8938.44
504.00 100.80 100.80 12.00 2553.84
60.005.0014
184.80 18.48 18.48 2.20 460.812
184.80 129.36 129.36 15.40 3225.684
184.80 36.96 36.96 4.40 921.624
60.005.0034
201.60 20.16 20.16 2.40 368.808
201.60 141.12 141.12 16.80 2581.656
201.60 40.32 40.32 4.80 737.616
60.005.0061
192.00 19.20 19.20 2.00 502.16
192.00 134.40 134.40 14.00 3515.12
192.00 38.40 38.40 4.00 1004.32
60.005.0062
120.00 12.00 12.00 1.00 282.85
120.00 84.00 84.00 7.00 1979.95
120.00 24.00 24.00 2.00 565.7
60.005.0071
264.00 26.40 26.40 1.00 573.96
264.00 184.80 184.80 7.00 4017.72
264.00 52.80 52.80 2.00 1147.92
60.005.0092
38.64 3.86 3.86 0.70 91.994
38.64 27.05 27.05 4.90 643.958
38.64 7.73 7.73 1.40 183.988
60.005.0202
216.00 21.60 21.60 0.30 543.366
216.00 151.20 151.20 2.10 3803.562
216.00 43.20 43.20 0.60 1086.732
70.001.0001
1,008.00 100.80 100.80 0.10 1407.773
1,008.00 705.60 705.60 0.70 9854.411
1,008.00 201.60 201.60 0.20 2815.546
70.001.0002
1,008.00 100.80 100.80 0.10 1407.773
1,008.00 604.80 604.80 0.60 8446.638
1,008.00 100.80 100.80 0.10 1407.773
1,008.00 201.60 201.60 0.20 2815.546
70.001.0003
384.00 38.40 38.40 0.10 540.503
384.00 230.40 230.40 0.60 3243.018
384.00 38.40 38.40 0.10 540.503
384.00 76.80 76.80 0.20 1081.006
70.001.0004
96.00 9.60 9.60 0.10 140.225
96.00 57.60 57.60 0.60 841.35
96.00 9.60 9.60 0.10 140.225
96.00 19.20 19.20 0.20 280.45
70.004.0002
144.00 14.40 14.40 0.30 257.646
144.00 86.40 86.40 1.80 1545.876
144.00 14.40 14.40 0.30 257.646
144.00 28.80 28.80 0.60 515.292
70.004.0003
48.00 4.80 4.80 0.10 88.061
48.00 28.80 28.80 0.60 528.366
48.00 4.80 4.80 0.10 88.061
48.00 9.60 9.60 0.20 176.122
70.004.0004
48.00 4.80 4.80 0.10 88.061
48.00 28.80 28.80 0.60 528.366
48.00 4.80 4.80 0.10 88.061
48.00 9.60 9.60 0.20 176.122
70.005.0001
480.00 48.00 48.00 0.10 1043.498
480.00 288.00 288.00 0.60 6260.988
480.00 48.00 48.00 0.10 1043.498
480.00 96.00 96.00 0.20 2086.996
70.005.0004
672.00 67.20 67.20 0.10 1310.351
672.00 403.20 403.20 0.60 7862.106
672.00 67.20 67.20 0.10 1310.351
672.00 134.40 134.40 0.20 2620.702
70.006.0003
720.00 72.00 72.00 0.10 1377.064
720.00 432.00 432.00 0.60 8262.384
720.00 72.00 72.00 0.10 1377.064
720.00 144.00 144.00 0.20 2754.128
70.006.0005
432.00 43.20 43.20 0.30 1730.703
432.00 259.20 259.20 1.80 10384.218
432.00 43.20 43.20 0.30 1730.703
432.00 86.40 86.40 0.60 3461.406
70.008.0101
60.00 6.00 6.00 0.10 86.365
60.00 36.00 36.00 0.60 518.19
60.00 6.00 6.00 0.10 86.365
60.00 12.00 12.00 0.20 172.73
70.009.0002
48.00 4.80 4.80 0.10 69.632
48.00 28.80 28.80 0.60 417.792
48.00 4.80 4.80 0.10 69.632
48.00 9.60 9.60 0.20 139.264
70.014.0001
60.00 6.00 6.00 0.10 451.891
60.00 36.00 36.00 0.60 2711.346
60.00 6.00 6.00 0.10 451.891
60.00 12.00 12.00 0.20 903.782
70.020.0000
4,500.00 4,500.00 4,500.00 1.00 30000

25.001.0001
0.00 0.00 0.00 0.00 0 0.02
25.001.0002
0.00 0.00 0.00 0.00 0 0.02
30.002.0001
0.00 0.00 0.00 0.00 0 0.13
30.002.0002
0.00 0.00 0.00 0.00 0 0.13

20.001.0001
0.00 0.00 0.00 52.86 0
0.00 0.00 0.00 10.57 0
0.00 0.00 0.00 42.29 0
20.001.0002
38.78 19.39 19.39 52.86 224.147592155
38.78 3.88 3.88 10.57 44.8295184311
38.78 15.51 15.51 42.29 179.318073724
20.001.0101
0.00 0.00 0.00 52.86 0
0.00 0.00 0.00 10.57 0
0.00 0.00 0.00 42.29 0
20.001.0102
40.54 20.27 20.27 52.86 234.720591785
40.54 4.05 4.05 10.57 46.9441183571
40.54 16.21 16.21 42.29 187.776473428
20.001.0003
0.00 0.00 0.00 43.05 0
0.00 0.00 0.00 8.61 0
0.00 0.00 0.00 34.44 0
20.001.0004
27.07 13.54 13.54 43.05 157.1507445
27.07 2.71 2.71 8.61 31.4301489
27.07 10.83 10.83 34.44 125.7205956
20.001.0103
0.00 0.00 0.00 43.05 0
0.00 0.00 0.00 8.61 0
0.00 0.00 0.00 34.44 0
20.001.0104
28.30 14.15 14.15 43.05 164.470094244
28.30 2.83 2.83 8.61 32.8940188488
28.30 11.32 11.32 34.44 131.576075395
20.002.0001
0.00 0.00 0.00 476.50 0
0.00 0.00 0.00 95.30 0
0.00 0.00 0.00 381.20 0
20.002.0002
299.62 149.81 149.81 476.50 1739.225
299.62 29.96 29.96 95.30 347.845
299.62 119.85 119.85 381.20 1391.38
40.001.0005
2,075.67 622.70 622.70 8,782.80 16248.1797798
2,075.67 311.35 311.35 4,391.40 8124.08988991
2,075.67 311.35 311.35 4,391.40 8124.08988991
2,075.67 830.27 830.27 11,710.40 21664.2397064
40.001.0009
154.56 46.37 46.37 654.00 1209.89995766
154.56 23.18 23.18 327.00 604.949978828
154.56 23.18 23.18 327.00 604.949978828
154.56 61.82 61.82 872.00 1613.19994354
40.001.0011
11.91 3.57 3.57 50.40 93.2399957657
11.91 1.79 1.79 25.20 46.6199978828
11.91 1.79 1.79 25.20 46.6199978828
11.91 4.76 4.76 67.20 124.319994354
40.002.2805
732.89 73.29 73.29 22.52 5187.7071297
732.89 146.58 146.58 45.04 10375.4142594
732.89 329.80 329.80 101.34 23344.6820836
732.89 73.29 73.29 22.52 5187.7071297
732.89 36.64 36.64 11.26 2593.85356485
732.89 73.29 73.29 22.52 5187.7071297
40.002.2809
242.17 24.22 24.22 1.09 456.89528401
242.17 48.43 48.43 2.18 913.79056802
242.17 24.22 24.22 1.09 456.89528401
242.17 84.76 84.76 3.81 1599.13349403
242.17 24.22 24.22 1.09 456.89528401
242.17 12.11 12.11 0.54 228.447642005
242.17 24.22 24.22 1.09 456.89528401
40.002.2811
71.56 7.16 7.16 0.21 149.141993227
71.56 14.31 14.31 0.42 298.283986454
71.56 7.16 7.16 0.21 149.141993227
71.56 25.05 25.05 0.73 521.996976295
71.56 7.16 7.16 0.21 149.141993227
71.56 3.58 3.58 0.10 74.5709966135
71.56 7.16 7.16 0.21 149.141993227
60.002.1061
54.20 13.55 13.55 3.03 611.836519289
54.20 16.26 16.26 3.63 734.203823147
54.20 13.55 13.55 3.03 611.836519289
54.20 5.42 5.42 1.21 244.734607716
54.20 5.42 5.42 1.21 244.734607716

70.001.2627
1,358.40 135.84 135.84 1,415.00 2745.1
1,358.40 815.04 815.04 8,490.00 16470.6
1,358.40 271.68 271.68 2,830.00 5490.2
1,358.40 135.84 135.84 1,415.00 2745.1
80.001.201
543.91 54.39 54.39 0.10 20
543.91 108.78 108.78 0.20 40
543.91 163.17 163.17 0.30 60
543.91 54.39 54.39 0.10 20
543.91 108.78 108.78 0.20 40
543.91 54.39 54.39 0.10 20
80.001.202
3,183.95 318.40 318.40 0.20 40
3,183.95 636.79 636.79 0.40 80
3,183.95 955.19 955.19 0.60 120
3,183.95 318.40 318.40 0.20 40
3,183.95 636.79 636.79 0.40 80
3,183.95 318.40 318.40 0.20 40
80.001.203
2,056.20 205.62 205.62 0.60 120
2,056.20 411.24 411.24 1.20 240
2,056.20 616.86 616.86 1.80 360
2,056.20 205.62 205.62 0.60 120
2,056.20 411.24 411.24 1.20 240
2,056.20 205.62 205.62 0.60 120
80.001.204
1,206.00 120.60 120.60 1.00 200
1,206.00 241.20 241.20 2.00 400
1,206.00 361.80 361.80 3.00 600
1,206.00 120.60 120.60 1.00 200
1,206.00 241.20 241.20 2.00 400
1,206.00 120.60 120.60 1.00 200
80.001.205
529.68 52.97 52.97 0.10 20
529.68 105.94 105.94 0.20 40
529.68 158.90 158.90 0.30 60
529.68 52.97 52.97 0.10 20
529.68 105.94 105.94 0.20 40
529.68 52.97 52.97 0.10 20
80.001.206
1,295.00 129.50 129.50 0.10 20
1,295.00 259.00 259.00 0.20 40
1,295.00 388.50 388.50 0.30 60
1,295.00 129.50 129.50 0.10 20
1,295.00 259.00 259.00 0.20 40
1,295.00 129.50 129.50 0.10 20
80.001.207
1,240.00 124.00 124.00 0.10 20
1,240.00 248.00 248.00 0.20 40
1,240.00 372.00 372.00 0.30 60
1,240.00 124.00 124.00 0.10 20
1,240.00 248.00 248.00 0.20 40
1,240.00 124.00 124.00 0.10 20
80.001.208
0.00 0.00 0.00 0.10 0
0.00 0.00 0.00 0.20 0
0.00 0.00 0.00 0.30 0
0.00 0.00 0.00 0.10 0
0.00 0.00 0.00 0.20 0
0.00 0.00 0.00 0.10 0
80.001.209
2,068.02 206.80 206.80 0.10 20
2,068.02 413.60 413.60 0.20 40
2,068.02 620.41 620.41 0.30 60
2,068.02 206.80 206.80 0.10 20
2,068.02 413.60 413.60 0.20 40
2,068.02 206.80 206.80 0.10 20
80.001.210
288.00 28.80 28.80 0.10 20
288.00 57.60 57.60 0.20 40
288.00 86.40 86.40 0.30 60
288.00 28.80 28.80 0.10 20
288.00 57.60 57.60 0.20 40
288.00 28.80 28.80 0.10 20
80.001.211
96.00 9.60 9.60 0.10 20
96.00 19.20 19.20 0.20 40
96.00 28.80 28.80 0.30 60
96.00 9.60 9.60 0.10 20
96.00 19.20 19.20 0.20 40
96.00 9.60 9.60 0.10 20
80.001.212
288.00 28.80 28.80 0.10 20
288.00 57.60 57.60 0.20 40
288.00 86.40 86.40 0.30 60
288.00 28.80 28.80 0.10 20
288.00 57.60 57.60 0.20 40
288.00 28.80 28.80 0.10 20
80.001.213
288.00 28.80 28.80 0.10 20
288.00 57.60 57.60 0.20 40
288.00 86.40 86.40 0.30 60
288.00 28.80 28.80 0.10 20
288.00 57.60 57.60 0.20 40
288.00 28.80 28.80 0.10 20
80.001.214
723.00 72.30 72.30 0.10 20
723.00 144.60 144.60 0.20 40
723.00 216.90 216.90 0.30 60
723.00 72.30 72.30 0.10 20
723.00 144.60 144.60 0.20 40
723.00 72.30 72.30 0.10 20
80.001.215
288.00 28.80 28.80 0.10 20
288.00 57.60 57.60 0.20 40
288.00 86.40 86.40 0.30 60
288.00 28.80 28.80 0.10 20
288.00 57.60 57.60 0.20 40
288.00 28.80 28.80 0.10 20
80.001.216
1,860.00 186.00 186.00 0.10 20
1,860.00 372.00 372.00 0.20 40
1,860.00 558.00 558.00 0.30 60
1,860.00 186.00 186.00 0.10 20
1,860.00 372.00 372.00 0.20 40
1,860.00 186.00 186.00 0.10 20
80.001.3204
60.00 6.00 6.00 0.10 0
60.00 36.00 36.00 0.60 0
60.00 12.00 12.00 0.20 0
60.00 6.00 6.00 0.10 0

20.001.0002
23.52 21.17 1.28 1.95 21.17052
23.52 2.35 0.14 0.22 2.35228
20.001.0005
175.67 158.10 9.25 10.86 158.09976
175.67 17.57 1.03 1.21 17.56664
20.001.0008
56.20 50.58 2.09 1.95 50.5827
56.20 5.62 0.23 0.22 5.6203
20.001.0011
425.89 383.31 15.65 10.86 383.30505
425.89 42.59 1.74 1.21 42.58945
20.002.0001
69.44 62.50 3.66 1.80 62.496
69.44 6.94 0.41 0.20 6.944
20.002.0007
202.98 182.68 10.61 2.70 182.682
202.98 20.30 1.18 0.30 20.298
20.002.0014
86.62 77.96 4.56 1.80 77.958
86.62 8.66 0.51 0.20 8.662
20.002.0023
20.87 18.78 1.06 0.90 18.783
20.87 2.09 0.12 0.10 2.087
20.002.0032
69.58 62.62 3.66 1.80 62.622
69.58 6.96 0.41 0.20 6.958
20.002.0033
129.09 116.18 6.84 2.70 116.181
129.09 12.91 0.76 0.30 12.909
20.002.0034
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.002.0044
148.60 133.74 7.82 1.80 133.74
148.60 14.86 0.87 0.20 14.86
20.002.0046
132.06 118.85 6.95 1.80 118.854
132.06 13.21 0.77 0.20 13.206
30.001.0015
67.20 60.48 3.54 1.80 60.48
67.20 6.72 0.39 0.20 6.72
30.001.0016
1,607.34 1,446.61 71.55 18.90 1446.606
1,607.34 160.73 7.95 2.10 160.734
40.001.0011
0.00 0.00 0.00 27.00 0
0.00 0.00 0.00 3.00 0
40.001.0019
0.00 0.00 0.00 4.50 0
0.00 0.00 0.00 0.50 0
40.001.0020
0.00 0.00 0.00 3.60 0
0.00 0.00 0.00 0.40 0
40.001.0024
0.00 0.00 0.00 0.90 0
0.00 0.00 0.00 0.10 0
40.007.0002
5.14 4.63 0.28 1.95 4.62861
5.14 0.51 0.03 0.22 0.51429
40.007.0005
29.56 26.60 1.56 10.86 26.603325
29.56 2.96 0.17 1.21 2.955925
40.007.0011
1,366.91 1,230.21 51.08 21.39 1230.214752
1,366.91 136.69 5.68 2.38 136.690528
40.007.0024
88.74 79.87 4.36 2.35 79.866
88.74 8.87 0.48 0.26 8.874
60.101.0015
443.88 399.49 22.30 8.10 399.492
443.88 44.39 2.48 0.90 44.388
60.101.0017
521.70 469.53 26.20 4.50 469.53
521.70 52.17 2.91 0.50 52.17
60.101.0018
273.63 246.27 14.64 2.70 246.267
273.63 27.36 1.63 0.30 27.363
60.101.0019
1,697.30 1,527.57 85.03 9.00 1527.57
1,697.30 169.73 9.45 1.00 169.73
60.101.0020
1,317.60 1,185.84 66.82 8.10 1185.84
1,317.60 131.76 7.42 0.90 131.76
60.101.0021
2,294.24 2,064.82 119.47 7.20 2064.816
2,294.24 229.42 13.27 0.80 229.424
20.001.0002
34.75 31.28 1.67 0.90 31.275
34.75 3.48 0.19 0.10 3.475
20.001.0005
146.73 132.06 6.71 2.70 132.057
146.73 14.67 0.75 0.30 14.673
20.001.0012
165.24 148.72 8.17 2.70 148.716
165.24 16.52 0.91 0.30 16.524
20.001.0025
139.71 125.74 6.05 2.35 125.74197
139.71 13.97 0.67 0.26 13.97133
20.003.0019
10.87 9.78 0.57 0.90 9.783
10.87 1.09 0.06 0.10 1.087
20.003.0048
17.86 16.07 0.90 1.80 16.074
17.86 1.79 0.10 0.20 1.786
20.003.0054
85.14 76.63 4.13 0.90 76.626
85.14 8.51 0.46 0.10 8.514
20.003.0065
136.00 122.40 5.97 4.50 122.4
136.00 13.60 0.66 0.50 13.6
20.003.0068
14.74 13.27 0.63 0.90 13.266
14.74 1.47 0.07 0.10 1.474
20.003.0072
13.52 12.17 0.52 0.90 12.168
13.52 1.35 0.06 0.10 1.352
20.003.0081
60.60 54.54 2.67 4.50 54.54
60.60 6.06 0.30 0.50 6.06
20.003.0083
221.78 199.60 9.95 1.80 199.602
221.78 22.18 1.11 0.20 22.178
20.003.0084
71.64 64.48 3.20 5.40 64.476
71.64 7.16 0.36 0.60 7.164
20.003.0089
104.32 93.89 4.59 1.80 93.888
104.32 10.43 0.51 0.20 10.432
20.003.0095
53.18 47.86 2.39 1.80 47.862
53.18 5.32 0.27 0.20 5.318
30.001.0015
83.48 75.13 4.32 1.80 75.132
83.48 8.35 0.48 0.20 8.348
30.001.0016
747.50 672.75 33.18 9.00 672.75
747.50 74.75 3.69 1.00 74.75
40.006.0002
2.40 2.16 0.13 0.90 2.16
2.40 0.24 0.01 0.10 0.24
40.006.0005
7.50 6.75 0.39 2.70 6.75
7.50 0.75 0.04 0.30 0.75
40.006.0011
12.24 11.02 0.58 2.70 11.016
12.24 1.22 0.06 0.30 1.224
40.006.0024
16.16 14.54 0.70 2.35 14.54031
16.16 1.62 0.08 0.26 1.61559
40.006.0024

20.001.0001
2.00 0.20 5.40 0.20 70.548
2.00 0.40 10.80 0.40 141.096
2.00 0.80 21.60 0.80 282.192
2.00 0.40 10.80 0.40 141.096
2.00 0.20 5.40 0.20 70.548
20.001.0016
2.00 0.20 2.88 0.20 44.154
2.00 0.40 5.76 0.40 88.308
2.00 0.80 11.52 0.80 176.616
2.00 0.40 5.76 0.40 88.308
2.00 0.20 2.88 0.20 44.154
20.001.0020
2.00 0.20 5.40 0.20 70.382
2.00 0.40 10.80 0.40 140.764
2.00 0.80 21.60 0.80 281.528
2.00 0.40 10.80 0.40 140.764
2.00 0.20 5.40 0.20 70.382
20.001.0031
6.00 0.60 5.76 0.60 102.498
6.00 1.20 11.52 1.20 204.996
6.00 2.40 23.04 2.40 409.992
6.00 1.20 11.52 1.20 204.996
6.00 0.60 5.76 0.60 102.498
20.001.0032
6.00 0.60 8.64 0.60 132.498
6.00 1.20 17.28 1.20 264.996
6.00 2.40 34.56 2.40 529.992
6.00 1.20 17.28 1.20 264.996
6.00 0.60 8.64 0.60 132.498
20.001.0038
6.00 0.60 7.20 0.60 117.486
6.00 1.20 14.40 1.20 234.972
6.00 2.40 28.80 2.40 469.944
6.00 1.20 14.40 1.20 234.972
6.00 0.60 7.20 0.60 117.486
20.001.0039
6.00 0.60 5.76 0.60 102.51
6.00 1.20 11.52 1.20 205.02
6.00 2.40 23.04 2.40 410.04
6.00 1.20 11.52 1.20 205.02
6.00 0.60 5.76 0.60 102.51
20.001.0040
24.00 2.40 64.80 2.40 845.352
24.00 4.80 129.60 4.80 1690.704
24.00 9.60 259.20 9.60 3381.408
24.00 4.80 129.60 4.80 1690.704
24.00 2.40 64.80 2.40 845.352
20.001.0041
16.00 1.60 33.60 1.60 463.104
16.00 3.20 67.20 3.20 926.208
16.00 6.40 134.40 6.40 1852.416
16.00 3.20 67.20 3.20 926.208
16.00 1.60 33.60 1.60 463.104
20.001.0042
8.00 0.80 15.36 0.80 216.96
8.00 1.60 30.72 1.60 433.92
8.00 3.20 61.44 3.20 867.84
8.00 1.60 30.72 1.60 433.92
8.00 0.80 15.36 0.80 216.96
20.001.0044
5.00 0.50 13.50 0.50 176.175
5.00 1.00 27.00 1.00 352.35
5.00 2.00 54.00 2.00 704.7
5.00 1.00 27.00 1.00 352.35
5.00 0.50 13.50 0.50 176.175
20.001.0049
6.00 0.60 10.08 0.60 147.492
6.00 1.20 20.16 1.20 294.984
6.00 2.40 40.32 2.40 589.968
6.00 1.20 20.16 1.20 294.984
6.00 0.60 10.08 0.60 147.492
20.001.0050
4.00 0.40 9.60 0.40 128.328
4.00 0.80 19.20 0.80 256.656
4.00 1.60 38.40 1.60 513.312
4.00 0.80 19.20 0.80 256.656
4.00 0.40 9.60 0.40 128.328
20.001.0052
7.00 0.70 18.90 0.70 246.414
7.00 1.40 37.80 1.40 492.828
7.00 2.80 75.60 2.80 985.656
7.00 1.40 37.80 1.40 492.828
7.00 0.70 18.90 0.70 246.414
20.001.00X3
3.00 0.30 9.54 0.30 150
3.00 0.60 19.08 0.60 300
3.00 1.20 38.16 1.20 600
3.00 0.60 19.08 0.60 300
3.00 0.30 9.54 0.30 150
20.003.0001
12.00 1.20 11.52 1.20 205.116
12.00 2.40 23.04 2.40 410.232
12.00 4.80 46.08 4.80 820.464
12.00 2.40 23.04 2.40 410.232
12.00 1.20 11.52 1.20 205.116
20.003.0002
2.00 0.20 19.20 0.20 214.054
2.00 0.40 38.40 0.40 428.108
2.00 0.80 76.80 0.80 856.216
2.00 0.40 38.40 0.40 428.108
2.00 0.20 19.20 0.20 214.054
20.003.0003
2.00 0.20 10.80 0.20 126.618
2.00 0.40 21.60 0.40 253.236
2.00 0.80 43.20 0.80 506.472
2.00 0.40 21.60 0.40 253.236
2.00 0.20 10.80 0.20 126.618
20.003.0011
1.00 0.10 3.18 0.10 50
1.00 0.20 6.36 0.20 100
1.00 0.40 12.72 0.40 200
1.00 0.20 6.36 0.20 100
1.00 0.10 3.18 0.10 50
20.005.0001
5.00 0.50 9.00 0.50 222.8
5.00 1.00 18.00 1.00 445.6
5.00 2.00 36.00 2.00 891.2
5.00 1.00 18.00 1.00 445.6
5.00 0.50 9.00 0.50 222.8
20.007.0001
1.00 0.10 0.00 0.10 0
1.00 0.20 0.00 0.20 0
1.00 0.40 0.00 0.40 0
1.00 0.20 0.00 0.20 0
1.00 0.10 0.00 0.10 0
20.008.0005
2.00 0.20 1.44 0.20 92.118
2.00 0.40 2.88 0.40 184.236
2.00 0.80 5.76 0.80 368.472
2.00 0.40 2.88 0.40 184.236
2.00 0.20 1.44 0.20 92.118

70.001.3009
120.00 12.00 12.00 0.05 318.1675
120.00 48.00 48.00 0.20 1272.67
120.00 24.00 24.00 0.10 636.335
120.00 24.00 24.00 0.10 636.335
120.00 12.00 12.00 0.05 318.1675
70.001.3010
24.00 2.40 2.40 0.05 63.6335
24.00 9.60 9.60 0.20 254.534
24.00 4.80 4.80 0.10 127.267
24.00 4.80 4.80 0.10 127.267
24.00 2.40 2.40 0.05 63.6335
30.001.5001
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5005
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5006
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5007
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5008
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5009
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5010
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5011
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5012
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5013
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5014
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5015
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5022
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5023
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5024
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5025
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5026
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5027
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5028
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5029
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5030
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5031
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5032
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5033
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45

40.001.0009
0.00 0.00 0.00 2.25 0
0.00 0.00 0.00 0.25 0
40.001.0018
0.00 0.00 0.00 3.60 0
0.00 0.00 0.00 0.40 0
40.001.0025
0.00 0.00 0.00 3.60 0
0.00 0.00 0.00 0.40 0
40.007.0023
8.54 7.68 0.54 0.18 7.6842
8.54 0.85 0.06 0.02 0.8538
60.101.0001
33.64 30.28 1.88 0.90 30.276
33.64 3.36 0.21 0.10 3.364
60.101.0002
145.23 130.71 6.11 2.70 130.707
145.23 14.52 0.68 0.30 14.523
60.101.0004
132.36 119.12 5.17 1.35 119.124
132.36 13.24 0.57 0.15 13.236
60.101.0005
66.08 59.47 2.06 0.45 59.472
66.08 6.61 0.23 0.05 6.608
60.101.0006
112.62 101.36 5.12 0.90 101.358
112.62 11.26 0.57 0.10 11.262
60.101.0007
606.15 545.54 29.39 4.05 545.535
606.15 60.62 3.27 0.45 60.615
60.101.0013
361.98 325.78 17.01 1.80 325.782
361.98 36.20 1.89 0.20 36.198
60.101.0017
208.68 187.81 10.48 1.80 187.812
208.68 20.87 1.16 0.20 20.868
60.101.0019
84.87 76.38 4.25 0.45 76.3785
84.87 8.49 0.47 0.05 8.4865
60.101.0020
366.00 329.40 18.56 2.25 329.4
366.00 36.60 2.06 0.25 36.6
60.101.0021
1,433.90 1,290.51 74.67 4.50 1290.51
1,433.90 143.39 8.30 0.50 143.39
20.001.0024
21.59 19.43 0.83 0.18 19.4328
21.59 2.16 0.09 0.02 2.1592
20.003.0055
79.10 71.19 3.54 0.45 71.1855
79.10 7.91 0.39 0.05 7.9095
20.003.0059
93.37 84.03 3.54 0.45 84.0285
93.37 9.34 0.39 0.05 9.3365
20.003.0068
14.74 13.27 0.63 0.90 13.266
14.74 1.47 0.07 0.10 1.474
20.003.0071
25.92 23.33 1.00 0.90 23.328
25.92 2.59 0.11 0.10 2.592
20.003.0076
90.72 81.65 3.51 3.15 81.648
90.72 9.07 0.39 0.35 9.072
20.003.0082
63.54 57.19 2.46 1.80 57.186
63.54 6.35 0.27 0.20 6.354
40.006.0023
1.93 1.73 0.07 0.18 1.7334
1.93 0.19 0.01 0.02 0.1926

20.002.0002
8,370.00 837.00 837.00 450.00 11826
8,370.00 5,859.00 5,859.00 3,150.00 82782
8,370.00 1,674.00 1,674.00 900.00 23652
20.002.0005
150.00 15.00 15.00 5.00 205.45
150.00 105.00 105.00 35.00 1438.15
150.00 30.00 30.00 10.00 410.9
20.002.0032
273.00 27.30 27.30 35.00 582.05
273.00 191.10 191.10 245.00 4074.35
273.00 54.60 54.60 70.00 1164.1
30.002.6312
255.00 25.50 25.50 125.00 363.75
255.00 178.50 178.50 875.00 2546.25
255.00 51.00 51.00 250.00 727.5
30.002.6314
39.00 3.90 3.90 25.00 54
39.00 27.30 27.30 175.00 378
39.00 7.80 7.80 50.00 108
30.002.6315
216.00 21.60 21.60 150.00 301.5
216.00 151.20 151.20 1,050.00 2110.5
216.00 43.20 43.20 300.00 603
30.002.7021
240.00 24.00 24.00 250.00 330
240.00 168.00 168.00 1,750.00 2310
240.00 48.00 48.00 500.00 660
30.002.7022
78.00 7.80 7.80 50.00 107.5
78.00 54.60 54.60 350.00 752.5
78.00 15.60 15.60 100.00 215
30.002.7221
24.00 2.40 2.40 25.00 32.75
24.00 16.80 16.80 175.00 229.25
24.00 4.80 4.80 50.00 65.5
30.002.7331
2.40 0.24 0.24 1.00 3.22
2.40 1.68 1.68 7.00 22.54
2.40 0.48 0.48 2.00 6.44
30.002.8101
75.00 7.50 7.50 25.00 103.5
75.00 52.50 52.50 175.00 724.5
75.00 15.00 15.00 50.00 207
30.002.8102
60.00 6.00 6.00 25.00 83
60.00 42.00 42.00 175.00 581
60.00 12.00 12.00 50.00 166
30.002.9113
792.00 79.20 79.20 600.00 1104
792.00 554.40 554.40 4,200.00 7728
792.00 158.40 158.40 1,200.00 2208
30.002.9114
2,640.00 264.00 264.00 2,000.00 3660
2,640.00 1,848.00 1,848.00 14,000.00 25620
2,640.00 528.00 528.00 4,000.00 7320
30.003.0001
735.00 73.50 73.50 175.00 1072.75
735.00 514.50 514.50 1,225.00 7509.25
735.00 147.00 147.00 350.00 2145.5
40.001.0001
302.40 30.24 30.24 20.00 423
302.40 211.68 211.68 140.00 2961
302.40 60.48 60.48 40.00 846
40.001.0002
32.40 3.24 3.24 10.00 44.8
32.40 22.68 22.68 70.00 313.6
32.40 6.48 6.48 20.00 89.6
40.002.0001
10.80 1.08 1.08 2.00 15.18
10.80 7.56 7.56 14.00 106.26
10.80 2.16 2.16 4.00 30.36
40.002.0002
588.00 58.80 58.80 175.00 824.25
588.00 411.60 411.60 1,225.00 5769.75
588.00 117.60 117.60 350.00 1648.5
40.002.0003
90.00 9.00 9.00 50.00 124.5
90.00 63.00 63.00 350.00 871.5
90.00 18.00 18.00 100.00 249
40.005.0001
324.00 32.40 32.40 15.00 925.65
324.00 226.80 226.80 105.00 6479.55
324.00 64.80 64.80 30.00 1851.3
50.001.1405
432.00 43.20 43.20 1.20 1558.884
432.00 216.00 216.00 6.00 7794.42
432.00 86.40 86.40 2.40 3117.768
432.00 86.40 86.40 2.40 3117.768
50.001.6306
10.80 1.08 1.08 0.75 12.0225
10.80 5.40 5.40 3.75 60.1125
10.80 2.16 2.16 1.50 24.045
10.80 2.16 2.16 1.50 24.045
50.001.6315
7.20 0.72 0.72 1.50 8.01
7.20 3.60 3.60 7.50 40.05
7.20 1.44 1.44 3.00 16.02
7.20 1.44 1.44 3.00 16.02
50.001.7021
18.00 1.80 1.80 5.00 20.05
18.00 9.00 9.00 25.00 100.25
18.00 3.60 3.60 10.00 40.1
18.00 3.60 3.60 10.00 40.1
50.001.7334
2.88 0.29 0.29 0.30 3.204
2.88 1.44 1.44 1.50 16.02
2.88 0.58 0.58 0.60 6.408
2.88 0.58 0.58 0.60 6.408
50.001.7338
5.40 0.54 0.54 0.30 6.009
5.40 2.70 2.70 1.50 30.045
5.40 1.08 1.08 0.60 12.018
5.40 1.08 1.08 0.60 12.018
50.001.9113
120.00 12.00 12.00 50.00 133.5
120.00 60.00 60.00 250.00 667.5
120.00 24.00 24.00 100.00 267
120.00 24.00 24.00 100.00 267
50.001.9114
240.00 24.00 24.00 100.00 267
240.00 120.00 120.00 500.00 1335
240.00 48.00 48.00 200.00 534
240.00 48.00 48.00 200.00 534
60.005.0081
2,538.00 253.80 253.80 35.25 5487.015
2,538.00 1,776.60 1,776.60 246.75 38409.105
2,538.00 507.60 507.60 70.50 10974.03
60.005.0092
35.88 3.59 3.59 0.65 85.423
35.88 25.12 25.12 4.55 597.961
35.88 7.18 7.18 1.30 170.846
70.001.0006
1,080.00 108.00 108.00 0.60 1622.43
1,080.00 648.00 648.00 3.60 9734.58
1,080.00 108.00 108.00 0.60 1622.43
1,080.00 216.00 216.00 1.20 3244.86
70.006.0006
1,296.00 129.60 129.60 0.60 4170.816
1,296.00 777.60 777.60 3.60 25024.896
1,296.00 129.60 129.60 0.60 4170.816
1,296.00 259.20 259.20 1.20 8341.632

20.008.0005
1.00 0.10 0.72 0.10 46.059
1.00 0.20 1.44 0.20 92.118
1.00 0.40 2.88 0.40 184.236
1.00 0.20 1.44 0.20 92.118
1.00 0.10 0.72 0.10 46.059
20.008.0009
0.50 0.05 0.18 0.05 12.2005
0.50 0.10 0.36 0.10 24.401
0.50 0.20 0.72 0.20 48.802
0.50 0.10 0.36 0.10 24.401
0.50 0.05 0.18 0.05 12.2005
40.002.0002
2.00 0.20 10.80 0.20 140.362
2.00 0.40 21.60 0.40 280.724
2.00 1.00 54.00 1.00 701.81
2.00 0.40 21.60 0.40 280.724
40.002.0005
7.50 0.75 45.00 0.75 567.585
7.50 1.50 90.00 1.50 1135.17
7.50 3.00 180.00 3.00 2270.34
7.50 1.50 90.00 1.50 1135.17
7.50 0.75 45.00 0.75 567.585
50.001.0005
6.00 0.60 43.20 0.60 515.91
6.00 1.20 86.40 1.20 1031.82
6.00 2.40 172.80 2.40 2063.64
6.00 1.20 86.40 1.20 1031.82
6.00 0.60 43.20 0.60 515.91
60.001.0002
1.50 0.15 1.80 0.15 21.363
1.50 0.30 3.60 0.30 42.726
1.50 0.60 7.20 0.60 85.452
1.50 0.30 3.60 0.30 42.726
1.50 0.15 1.80 0.15 21.363
60.001.0003
1.00 0.10 4.80 0.10 63.841
1.00 0.20 9.60 0.20 127.682
1.00 0.40 19.20 0.40 255.364
1.00 0.20 9.60 0.20 127.682
1.00 0.10 4.80 0.10 63.841

20.003.0001
3,352.56 3,352.56 91.60 458.00 3352.56 0.00
20.004.0003
1,911.41 1,911.41 108.55 39.50 1911.405 0.00
25.001.0001
1,624.48 1,624.48 48.85 113.60 1624.48 0.02
25.002.0001
2,483.70 2,483.70 95.10 158.50 2483.695 0.02
25.004.0001
7,247.76 7,247.76 134.44 1,222.22 7247.759856 0.00
25.007.0001
11,776.85 11,776.85 190.85 1,122.67 11776.846064 0.00
25.007.0002
46,246.50 46,246.50 914.95 2,772.57 46246.504296 0.03
30.002.0001
3,238.06 3,238.06 199.96 113.62 3238.056 0.13
30.007.0001
6,430.47 6,430.47 173.80 4,344.92 6430.4742 0.00
40.007.0002
2,095.16 2,095.16 130.26 52.74 2095.16155 0.13

70.001.3009
120.00 12.00 12.00 0.05 318.1675
120.00 48.00 48.00 0.20 1272.67
120.00 24.00 24.00 0.10 636.335
120.00 24.00 24.00 0.10 636.335
120.00 12.00 12.00 0.05 318.1675
70.001.3010
24.00 2.40 2.40 0.05 63.6335
24.00 9.60 9.60 0.20 254.534
24.00 4.80 4.80 0.10 127.267
24.00 4.80 4.80 0.10 127.267
24.00 2.40 2.40 0.05 63.6335
30.001.5001
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5005
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5006
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5007
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5008
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5009
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5010
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5011
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5012
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5013
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5014
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5015
180.00 18.00 18.00 0.05 477.251
180.00 72.00 72.00 0.20 1909.004
180.00 36.00 36.00 0.10 954.502
180.00 36.00 36.00 0.10 954.502
180.00 18.00 18.00 0.05 477.251
30.001.5022
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5023
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5024
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5025
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5026
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5027
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5028
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5029
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5030
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5031
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5032
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45
30.001.5033
36.00 3.60 3.60 0.05 95.45
36.00 14.40 14.40 0.20 381.8
36.00 7.20 7.20 0.10 190.9
36.00 7.20 7.20 0.10 190.9
36.00 3.60 3.60 0.05 95.45

40.001.0009
0.00 0.00 0.00 2.25 0
0.00 0.00 0.00 0.25 0
40.001.0018
0.00 0.00 0.00 3.60 0
0.00 0.00 0.00 0.40 0
40.001.0025
0.00 0.00 0.00 3.60 0
0.00 0.00 0.00 0.40 0
40.007.0023
8.54 7.68 0.54 0.18 7.6842
8.54 0.85 0.06 0.02 0.8538
60.101.0001
33.64 30.28 1.88 0.90 30.276
33.64 3.36 0.21 0.10 3.364
60.101.0002
145.23 130.71 6.11 2.70 130.707
145.23 14.52 0.68 0.30 14.523
60.101.0004
132.36 119.12 5.17 1.35 119.124
132.36 13.24 0.57 0.15 13.236
60.101.0005
66.08 59.47 2.06 0.45 59.472
66.08 6.61 0.23 0.05 6.608
60.101.0006
112.62 101.36 5.12 0.90 101.358
112.62 11.26 0.57 0.10 11.262
60.101.0007
606.15 545.54 29.39 4.05 545.535
606.15 60.62 3.27 0.45 60.615
60.101.0013
361.98 325.78 17.01 1.80 325.782
361.98 36.20 1.89 0.20 36.198
60.101.0017
208.68 187.81 10.48 1.80 187.812
208.68 20.87 1.16 0.20 20.868
60.101.0019
84.87 76.38 4.25 0.45 76.3785
84.87 8.49 0.47 0.05 8.4865
60.101.0020
366.00 329.40 18.56 2.25 329.4
366.00 36.60 2.06 0.25 36.6
60.101.0021
1,433.90 1,290.51 74.67 4.50 1290.51
1,433.90 143.39 8.30 0.50 143.39
20.001.0024
21.59 19.43 0.83 0.18 19.4328
21.59 2.16 0.09 0.02 2.1592
20.003.0055
79.10 71.19 3.54 0.45 71.1855
79.10 7.91 0.39 0.05 7.9095
20.003.0059
93.37 84.03 3.54 0.45 84.0285
93.37 9.34 0.39 0.05 9.3365
20.003.0068
14.74 13.27 0.63 0.90 13.266
14.74 1.47 0.07 0.10 1.474
20.003.0071
25.92 23.33 1.00 0.90 23.328
25.92 2.59 0.11 0.10 2.592
20.003.0076
90.72 81.65 3.51 3.15 81.648
90.72 9.07 0.39 0.35 9.072
20.003.0082
63.54 57.19 2.46 1.80 57.186
63.54 6.35 0.27 0.20 6.354
40.006.0023
1.93 1.73 0.07 0.18 1.7334
1.93 0.19 0.01 0.02 0.1926

20.002.0002
8,370.00 837.00 837.00 450.00 11826
8,370.00 5,859.00 5,859.00 3,150.00 82782
8,370.00 1,674.00 1,674.00 900.00 23652
20.002.0005
150.00 15.00 15.00 5.00 205.45
150.00 105.00 105.00 35.00 1438.15
150.00 30.00 30.00 10.00 410.9
20.002.0032
273.00 27.30 27.30 35.00 582.05
273.00 191.10 191.10 245.00 4074.35
273.00 54.60 54.60 70.00 1164.1
30.002.6312
255.00 25.50 25.50 125.00 363.75
255.00 178.50 178.50 875.00 2546.25
255.00 51.00 51.00 250.00 727.5
30.002.6314
39.00 3.90 3.90 25.00 54
39.00 27.30 27.30 175.00 378
39.00 7.80 7.80 50.00 108
30.002.6315
216.00 21.60 21.60 150.00 301.5
216.00 151.20 151.20 1,050.00 2110.5
216.00 43.20 43.20 300.00 603
30.002.7021
240.00 24.00 24.00 250.00 330
240.00 168.00 168.00 1,750.00 2310
240.00 48.00 48.00 500.00 660
30.002.7022
78.00 7.80 7.80 50.00 107.5
78.00 54.60 54.60 350.00 752.5
78.00 15.60 15.60 100.00 215
30.002.7221
24.00 2.40 2.40 25.00 32.75
24.00 16.80 16.80 175.00 229.25
24.00 4.80 4.80 50.00 65.5
30.002.7331
2.40 0.24 0.24 1.00 3.22
2.40 1.68 1.68 7.00 22.54
2.40 0.48 0.48 2.00 6.44
30.002.8101
75.00 7.50 7.50 25.00 103.5
75.00 52.50 52.50 175.00 724.5
75.00 15.00 15.00 50.00 207
30.002.8102
60.00 6.00 6.00 25.00 83
60.00 42.00 42.00 175.00 581
60.00 12.00 12.00 50.00 166
30.002.9113
792.00 79.20 79.20 600.00 1104
792.00 554.40 554.40 4,200.00 7728
792.00 158.40 158.40 1,200.00 2208
30.002.9114
2,640.00 264.00 264.00 2,000.00 3660
2,640.00 1,848.00 1,848.00 14,000.00 25620
2,640.00 528.00 528.00 4,000.00 7320
30.003.0001
735.00 73.50 73.50 175.00 1072.75
735.00 514.50 514.50 1,225.00 7509.25
735.00 147.00 147.00 350.00 2145.5
40.001.0001
302.40 30.24 30.24 20.00 423
302.40 211.68 211.68 140.00 2961
302.40 60.48 60.48 40.00 846
40.001.0002
32.40 3.24 3.24 10.00 44.8
32.40 22.68 22.68 70.00 313.6
32.40 6.48 6.48 20.00 89.6
40.002.0001
10.80 1.08 1.08 2.00 15.18
10.80 7.56 7.56 14.00 106.26
10.80 2.16 2.16 4.00 30.36
40.002.0002
588.00 58.80 58.80 175.00 824.25
588.00 411.60 411.60 1,225.00 5769.75
588.00 117.60 117.60 350.00 1648.5
40.002.0003
90.00 9.00 9.00 50.00 124.5
90.00 63.00 63.00 350.00 871.5
90.00 18.00 18.00 100.00 249
40.005.0001
324.00 32.40 32.40 15.00 925.65
324.00 226.80 226.80 105.00 6479.55
324.00 64.80 64.80 30.00 1851.3
50.001.1405
432.00 43.20 43.20 1.20 1558.884
432.00 216.00 216.00 6.00 7794.42
432.00 86.40 86.40 2.40 3117.768
432.00 86.40 86.40 2.40 3117.768
50.001.6306
10.80 1.08 1.08 0.75 12.0225
10.80 5.40 5.40 3.75 60.1125
10.80 2.16 2.16 1.50 24.045
10.80 2.16 2.16 1.50 24.045
50.001.6315
7.20 0.72 0.72 1.50 8.01
7.20 3.60 3.60 7.50 40.05
7.20 1.44 1.44 3.00 16.02
7.20 1.44 1.44 3.00 16.02
50.001.7021
18.00 1.80 1.80 5.00 20.05
18.00 9.00 9.00 25.00 100.25
18.00 3.60 3.60 10.00 40.1
18.00 3.60 3.60 10.00 40.1
50.001.7334
2.88 0.29 0.29 0.30 3.204
2.88 1.44 1.44 1.50 16.02
2.88 0.58 0.58 0.60 6.408
2.88 0.58 0.58 0.60 6.408
50.001.7338
5.40 0.54 0.54 0.30 6.009
5.40 2.70 2.70 1.50 30.045
5.40 1.08 1.08 0.60 12.018
5.40 1.08 1.08 0.60 12.018
50.001.9113
120.00 12.00 12.00 50.00 133.5
120.00 60.00 60.00 250.00 667.5
120.00 24.00 24.00 100.00 267
120.00 24.00 24.00 100.00 267
50.001.9114
240.00 24.00 24.00 100.00 267
240.00 120.00 120.00 500.00 1335
240.00 48.00 48.00 200.00 534
240.00 48.00 48.00 200.00 534
60.005.0081
2,538.00 253.80 253.80 35.25 5487.015
2,538.00 1,776.60 1,776.60 246.75 38409.105
2,538.00 507.60 507.60 70.50 10974.03
60.005.0092
35.88 3.59 3.59 0.65 85.423
35.88 25.12 25.12 4.55 597.961
35.88 7.18 7.18 1.30 170.846
70.001.0006
1,080.00 108.00 108.00 0.60 1622.43
1,080.00 648.00 648.00 3.60 9734.58
1,080.00 108.00 108.00 0.60 1622.43
1,080.00 216.00 216.00 1.20 3244.86
70.006.0006
1,296.00 129.60 129.60 0.60 4170.816
1,296.00 777.60 777.60 3.60 25024.896
1,296.00 129.60 129.60 0.60 4170.816
1,296.00 259.20 259.20 1.20 8341.632

20.008.0005
1.00 0.10 0.72 0.10 46.059
1.00 0.20 1.44 0.20 92.118
1.00 0.40 2.88 0.40 184.236
1.00 0.20 1.44 0.20 92.118
1.00 0.10 0.72 0.10 46.059
20.008.0009
0.50 0.05 0.18 0.05 12.2005
0.50 0.10 0.36 0.10 24.401
0.50 0.20 0.72 0.20 48.802
0.50 0.10 0.36 0.10 24.401
0.50 0.05 0.18 0.05 12.2005
40.002.0002
2.00 0.20 10.80 0.20 140.362
2.00 0.40 21.60 0.40 280.724
2.00 1.00 54.00 1.00 701.81
2.00 0.40 21.60 0.40 280.724
40.002.0005
7.50 0.75 45.00 0.75 567.585
7.50 1.50 90.00 1.50 1135.17
7.50 3.00 180.00 3.00 2270.34
7.50 1.50 90.00 1.50 1135.17
7.50 0.75 45.00 0.75 567.585
50.001.0005
6.00 0.60 43.20 0.60 515.91
6.00 1.20 86.40 1.20 1031.82
6.00 2.40 172.80 2.40 2063.64
6.00 1.20 86.40 1.20 1031.82
6.00 0.60 43.20 0.60 515.91
60.001.0002
1.50 0.15 1.80 0.15 21.363
1.50 0.30 3.60 0.30 42.726
1.50 0.60 7.20 0.60 85.452
1.50 0.30 3.60 0.30 42.726
1.50 0.15 1.80 0.15 21.363
60.001.0003
1.00 0.10 4.80 0.10 63.841
1.00 0.20 9.60 0.20 127.682
1.00 0.40 19.20 0.40 255.364
1.00 0.20 9.60 0.20 127.682
1.00 0.10 4.80 0.10 63.841

20.003.0001
3,352.56 3,352.56 91.60 458.00 3352.56 0.00
20.004.0003
1,911.41 1,911.41 108.55 39.50 1911.405 0.00
25.001.0001
1,624.48 1,624.48 48.85 113.60 1624.48 0.02
25.002.0001
2,483.70 2,483.70 95.10 158.50 2483.695 0.02
25.004.0001
7,247.76 7,247.76 134.44 1,222.22 7247.759856 0.00
25.007.0001
11,776.85 11,776.85 190.85 1,122.67 11776.846064 0.00
25.007.0002
46,246.50 46,246.50 914.95 2,772.57 46246.504296 0.03
30.002.0001
3,238.06 3,238.06 199.96 113.62 3238.056 0.13
30.007.0001
6,430.47 6,430.47 173.80 4,344.92 6430.4742 0.00
40.007.0002
2,095.16 2,095.16 130.26 52.74 2095.16155 0.13

20.001.0001
0.00 0.00 0.00 16.35 0
0.00 0.00 0.00 3.27 0
0.00 0.00 0.00 13.08 0
20.001.0002
12.00 6.00 6.00 16.35 69.3418105103
12.00 1.20 1.20 3.27 13.8683621021
12.00 4.80 4.80 13.08 55.4734484082
20.001.0101
0.00 0.00 0.00 16.35 0
0.00 0.00 0.00 3.27 0
0.00 0.00 0.00 13.08 0
20.001.0102
12.54 6.27 6.27 16.35 72.6126506287
12.54 1.25 1.25 3.27 14.5225301257
12.54 5.02 5.02 13.08 58.0901205029
20.001.0003
0.00 0.00 0.00 13.32 0
0.00 0.00 0.00 2.66 0
0.00 0.00 0.00 10.66 0
20.001.0004
8.38 4.19 4.19 13.32 48.6158117599
8.38 0.84 0.84 2.66 9.72316235199
8.38 3.35 3.35 10.66 38.892649408
20.001.0103
0.00 0.00 0.00 13.32 0
0.00 0.00 0.00 2.66 0
0.00 0.00 0.00 10.66 0
20.001.0104
8.76 4.38 4.38 13.32 50.8801098419
8.76 0.88 0.88 2.66 10.1760219684
8.76 3.50 3.50 10.66 40.7040878735
20.001.0008
17.00 8.50 8.50 29.00 98.2964401423
17.00 1.70 1.70 5.80 19.6592880285
17.00 6.80 6.80 23.20 78.6371521138
20.001.0108
17.78 8.89 8.89 29.00 102.935800149
17.78 1.78 1.78 5.80 20.5871600298
17.78 7.11 7.11 23.20 82.3486401192
20.001.0012
13.05 6.52 6.52 23.72 75.4423201092
13.05 1.30 1.30 4.74 15.0884640218
13.05 5.22 5.22 18.98 60.3538560873
20.001.0112
13.64 6.82 6.82 23.72 79.0009201143
13.64 1.36 1.36 4.74 15.8001840229
13.64 5.46 5.46 18.98 63.2007360915
20.002.0001
0.00 0.00 0.00 141.81 0
0.00 0.00 0.00 28.36 0
0.00 0.00 0.00 113.45 0
20.002.0002
89.17 44.59 44.59 141.81 517.6065
89.17 8.92 8.92 28.36 103.5213
89.17 35.67 35.67 113.45 414.0852
40.001.0005
298.48 89.54 89.54 1,262.98 2336.50552954
298.48 44.77 44.77 631.49 1168.25276477
298.48 44.77 44.77 631.49 1168.25276477
298.48 119.39 119.39 1,683.97 3115.34070605
40.001.0006
105.07 31.52 31.52 444.60 822.51
105.07 15.76 15.76 222.30 411.255
105.07 15.76 15.76 222.30 411.255
105.07 42.03 42.03 592.80 1096.68
40.001.0009
47.81 14.34 14.34 202.32 374.29201355
47.81 7.17 7.17 101.16 187.146006775
47.81 7.17 7.17 101.16 187.146006775
47.81 19.13 19.13 269.76 499.056018066
40.001.0010
93.45 28.03 28.03 395.40 731.490001059
93.45 14.02 14.02 197.70 365.745000529
93.45 14.02 14.02 197.70 365.745000529
93.45 37.38 37.38 527.20 975.320001411
40.001.0011
59.08 17.72 17.72 249.98 462.47038916
59.08 8.86 8.86 124.99 231.23519458
59.08 8.86 8.86 124.99 231.23519458
59.08 23.63 23.63 333.31 616.627185547
40.001.0027
39.48 11.84 11.84 167.04 309.024
39.48 5.92 5.92 83.52 154.512
39.48 5.92 5.92 83.52 154.512
39.48 15.79 15.79 222.72 412.032
40.002.2805
105.39 10.54 10.54 3.24 745.997801504
105.39 21.08 21.08 6.48 1491.99560301
105.39 10.54 10.54 3.24 745.997801504
105.39 36.89 36.89 11.33 2610.99230526
105.39 10.54 10.54 3.24 745.997801504
105.39 5.27 5.27 1.62 372.998900752
105.39 10.54 10.54 3.24 745.997801504
40.002.2806
33.68 3.37 3.37 1.48 309.6639
33.68 6.74 6.74 2.96 619.3278
33.68 3.37 3.37 1.48 309.6639
33.68 11.79 11.79 5.19 1083.82365
33.68 3.37 3.37 1.48 309.6639
33.68 1.68 1.68 0.74 154.83195
33.68 3.37 3.37 1.48 309.6639
40.002.2809
74.92 7.49 7.49 0.34 141.344129117
74.92 14.98 14.98 0.67 282.688258234
74.92 7.49 7.49 0.34 141.344129117
74.92 26.22 26.22 1.18 494.704451909
74.92 7.49 7.49 0.34 141.344129117
74.92 3.75 3.75 0.17 70.6720645584
74.92 7.49 7.49 0.34 141.344129117
40.002.2810
55.50 5.55 5.55 0.53 153.884408223
55.50 11.10 11.10 1.05 307.768816445
55.50 5.55 5.55 0.53 153.884408223
55.50 19.43 19.43 1.85 538.595428779
55.50 5.55 5.55 0.53 153.884408223
55.50 2.78 2.78 0.26 76.9422041113
55.50 5.55 5.55 0.53 153.884408223
40.002.2811
354.94 35.49 35.49 1.04 739.744302661
354.94 70.99 70.99 2.08 1479.48860532
354.94 35.49 35.49 1.04 739.744302661
354.94 124.23 124.23 3.65 2589.10505931
354.94 35.49 35.49 1.04 739.744302661
354.94 17.75 17.75 0.52 369.872151331
354.94 35.49 35.49 1.04 739.744302661
40.002.3527
49.29 4.93 4.93 0.46 155.66736
49.29 9.86 9.86 0.93 311.33472
49.29 4.93 4.93 0.46 155.66736
49.29 17.25 17.25 1.62 544.83576
49.29 4.93 4.93 0.46 155.66736
49.29 2.46 2.46 0.23 77.83368
49.29 4.93 4.93 0.46 155.66736
60.002.1061
12.60 3.15 3.15 0.70 142.18878
12.60 3.78 3.78 0.84 170.626536
12.60 3.15 3.15 0.70 142.18878
12.60 1.26 1.26 0.28 56.875512
12.60 1.26 1.26 0.28 56.875512

10.001.0003
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.001.0103
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.001.0203
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.001.0303
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.001.0403
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.001.0503
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.005.0003
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.006.0003
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.009.0003
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.009.0103
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.009.0203
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0

10.001.2001
10.001.20010 0.00 0.00 0.00 0
10.001.20010 0.00 0.00 0.00 0
10.001.20010 0.00 0.00 0.00 0
10.002.2001
10.002.20010 0.00 0.00 0.00 0
10.002.20010 0.00 0.00 0.00 0
10.002.20010 0.00 0.00 0.00 0

70.001.2631
813.12 81.31 81.31 847.00 3955.49
813.12 487.87 487.87 5,082.00 23732.94
813.12 162.62 162.62 1,694.00 7910.98
813.12 81.31 81.31 847.00 3955.49
30.001.5016
0.00 0.00 0.00 0.00 6.99968
0.00 0.00 0.00 0.01 27.99872
0.00 0.00 0.00 0.00 13.99936
0.00 0.00 0.00 0.00 13.99936
0.00 0.00 0.00 0.00 6.99968
30.001.5017
0.00 0.00 0.00 0.00 6.99968
0.00 0.00 0.00 0.01 27.99872
0.00 0.00 0.00 0.00 13.99936
0.00 0.00 0.00 0.00 13.99936
0.00 0.00 0.00 0.00 6.99968
30.001.5018
0.00 0.00 0.00 0.00 6.99968
0.00 0.00 0.00 0.01 27.99872
0.00 0.00 0.00 0.00 13.99936
0.00 0.00 0.00 0.00 13.99936
0.00 0.00 0.00 0.00 6.99968
60.001.1707
0.00 0.00 0.00 0.00 10.49952
0.00 0.00 0.00 0.01 62.99712
0.00 0.00 0.00 0.00 20.99904
0.00 0.00 0.00 0.00 10.49952
60.001.1708
0.00 0.00 0.00 0.00 3.18168
0.00 0.00 0.00 0.01 19.09008
0.00 0.00 0.00 0.00 6.36336
0.00 0.00 0.00 0.00 3.18168
70.001.3801
180.00 18.00 18.00 0.00 7.11306
180.00 108.00 108.00 0.01 42.67836
180.00 36.00 36.00 0.00 14.22612
180.00 18.00 18.00 0.00 7.11306
70.001.3802
144.00 14.40 14.40 0.00 5.69044
144.00 86.40 86.40 0.01 34.14264
144.00 28.80 28.80 0.00 11.38088
144.00 14.40 14.40 0.00 5.69044
70.001.3803
0.00 0.00 0.00 0.00 9.54502
0.00 0.00 0.00 0.01 57.27012
0.00 0.00 0.00 0.00 19.09004
0.00 0.00 0.00 0.00 9.54502
70.001.3804
0.00 0.00 0.00 0.00 7.63602
0.00 0.00 0.00 0.01 45.81612
0.00 0.00 0.00 0.00 15.27204
0.00 0.00 0.00 0.00 7.63602
80.001.218
616.48 61.65 61.65 0.00 0.4
616.48 123.30 123.30 0.00 0.8
616.48 184.95 184.95 0.01 1.2
616.48 61.65 61.65 0.00 0.4
616.48 123.30 123.30 0.00 0.8
616.48 61.65 61.65 0.00 0.4
80.001.252
1,290.72 129.07 129.07 0.20 40
1,290.72 258.14 258.14 0.40 80
1,290.72 387.22 387.22 0.60 120
1,290.72 129.07 129.07 0.20 40
1,290.72 258.14 258.14 0.40 80
1,290.72 129.07 129.07 0.20 40
80.001.253
1,437.62 143.76 143.76 81.10 16220
1,437.62 287.52 287.52 162.20 32440
1,437.62 431.29 431.29 243.30 48660
1,437.62 143.76 143.76 81.10 16220
1,437.62 287.52 287.52 162.20 32440
1,437.62 143.76 143.76 81.10 16220
80.001.255
529.68 52.97 52.97 0.10 20
529.68 105.94 105.94 0.20 40
529.68 158.90 158.90 0.30 60
529.68 52.97 52.97 0.10 20
529.68 105.94 105.94 0.20 40
529.68 52.97 52.97 0.10 20
80.001.258
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.01 1.2
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.00 0.4
80.001.259
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.01 1.2
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.00 0.4
80.001.260
108.00 10.80 10.80 0.10 20
108.00 21.60 21.60 0.20 40
108.00 32.40 32.40 0.30 60
108.00 10.80 10.80 0.10 20
108.00 21.60 21.60 0.20 40
108.00 10.80 10.80 0.10 20
80.001.263
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.01 1.2
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.00 0.4
80.001.264
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.01 1.2
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.00 0.4
80.001.265
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.01 1.2
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.00 0.4
80.001.266
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.01 1.2
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.00 0.4
80.001.267
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.01 1.2
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.00 0.4
80.001.270
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.01 1.2
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.00 0.4
80.001.271
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.01 1.2
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.00 0.4
80.001.272
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.01 1.2
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.00 0.4
80.001.273
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.01 1.2
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.00 0.4
80.001.274
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.01 1.2
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.00 0.4
80.001.275
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.01 1.2
0.00 0.00 0.00 0.00 0.4
0.00 0.00 0.00 0.00 0.8
0.00 0.00 0.00 0.00 0.4
80.001.276
434.81 43.48 43.48 0.10 20
434.81 86.96 86.96 0.20 40
434.81 130.44 130.44 0.30 60
434.81 43.48 43.48 0.10 20
434.81 86.96 86.96 0.20 40
434.81 43.48 43.48 0.10 20
80.001.3201
117.00 11.70 11.70 0.10 231.174
117.00 70.20 70.20 0.60 1387.044
117.00 23.40 23.40 0.20 462.348
117.00 11.70 11.70 0.10 231.174
80.001.3206
117.00 11.70 11.70 0.10 231.174
117.00 70.20 70.20 0.60 1387.044
117.00 23.40 23.40 0.20 462.348
117.00 11.70 11.70 0.10 231.174

20.001.0006
196.30 176.67 8.30 9.00 176.67
196.30 19.63 0.92 1.00 19.63
20.001.0012
318.90 287.01 13.49 9.00 287.01
318.90 31.89 1.50 1.00 31.89
20.002.0045
110.09 99.08 4.17 0.90 99.081
110.09 11.01 0.46 0.10 11.009
30.001.0016
76.54 68.89 3.41 0.90 68.886
76.54 7.65 0.38 0.10 7.654
40.001.0003
0.00 0.00 0.00 5.40 0
0.00 0.00 0.00 0.60 0
40.001.0010
0.00 0.00 0.00 25.20 0
0.00 0.00 0.00 2.80 0
40.001.0015
0.00 0.00 0.00 8.10 0
0.00 0.00 0.00 0.90 0
40.001.0024
0.00 0.00 0.00 2.70 0
0.00 0.00 0.00 0.30 0
40.001.0025
0.00 0.00 0.00 2.70 0
0.00 0.00 0.00 0.30 0
40.001.0026
0.00 0.00 0.00 3.60 0
0.00 0.00 0.00 0.40 0
40.007.0011
122.63 110.37 4.58 1.92 110.369376
122.63 12.26 0.51 0.21 12.263264
40.007.0014
28.40 25.56 1.19 9.00 25.56
28.40 2.84 0.13 1.00 2.84
40.007.0024
8,233.17 7,409.85 404.33 217.94 7409.8512
8,233.17 823.32 44.93 24.22 823.3168
60.101.0003
269.70 242.73 12.80 4.50 242.73
269.70 26.97 1.42 0.50 26.97
60.101.0004
352.96 317.66 13.80 3.60 317.664
352.96 35.30 1.53 0.40 35.296
60.101.0019
848.65 763.79 42.52 4.50 763.785
848.65 84.87 4.72 0.50 84.865
60.101.0021
573.56 516.20 29.87 1.80 516.204
573.56 57.36 3.32 0.20 57.356
20.001.0012
55.08 49.57 2.72 0.90 49.572
55.08 5.51 0.30 0.10 5.508
20.001.0015
475.80 428.22 19.96 9.00 428.22
475.80 47.58 2.22 1.00 47.58
20.001.0025
12,962.40 11,666.16 561.08 217.94 11666.156904
12,962.40 1,296.24 62.34 24.22 1296.239656
20.003.0002
92.28 83.05 4.13 0.90 83.052
92.28 9.23 0.46 0.10 9.228
20.003.0019
10.87 9.78 0.57 0.90 9.783
10.87 1.09 0.06 0.10 1.087
20.003.0061
32.24 29.02 1.45 1.80 29.016
32.24 3.22 0.16 0.20 3.224
20.003.0064
28.84 25.96 1.26 1.80 25.956
28.84 2.88 0.14 0.20 2.884
20.003.0065
190.40 171.36 8.35 6.30 171.36
190.40 19.04 0.93 0.70 19.04
20.003.0068
14.74 13.27 0.63 0.90 13.266
14.74 1.47 0.07 0.10 1.474
20.003.0081
12.12 10.91 0.53 0.90 10.908
12.12 1.21 0.06 0.10 1.212
40.006.0011
4.08 3.67 0.19 0.90 3.672
4.08 0.41 0.02 0.10 0.408
40.006.0014
28.40 25.56 1.19 9.00 25.56
28.40 2.84 0.13 1.00 2.84
40.006.0024
1,498.92 1,349.03 64.87 217.94 1349.028792
1,498.92 149.89 7.21 24.22 149.892088

20.001.0003
0.36 0.04 4.10 0.04 45.2232
0.36 0.07 8.21 0.07 90.4464
0.36 0.14 16.42 0.14 180.8928
0.36 0.07 8.21 0.07 90.4464
0.36 0.04 4.10 0.04 45.2232
20.001.0015
5.40 0.54 9.07 0.54 132.6564
5.40 1.08 18.14 1.08 265.3128
5.40 2.16 36.29 2.16 530.6256
5.40 1.08 18.14 1.08 265.3128
5.40 0.54 9.07 0.54 132.6564
20.001.0016
0.72 0.07 1.04 0.07 15.89544
0.72 0.14 2.07 0.14 31.79088
0.72 0.29 4.15 0.29 63.58176
0.72 0.14 2.07 0.14 31.79088
0.72 0.07 1.04 0.07 15.89544
20.001.0020
0.72 0.07 1.94 0.07 25.33752
0.72 0.14 3.89 0.14 50.67504
0.72 0.29 7.78 0.29 101.35008
0.72 0.14 3.89 0.14 50.67504
0.72 0.07 1.94 0.07 25.33752
20.001.0031
25.20 2.52 24.19 2.52 430.4916
25.20 5.04 48.38 5.04 860.9832
25.20 10.08 96.77 10.08 1721.9664
25.20 5.04 48.38 5.04 860.9832
25.20 2.52 24.19 2.52 430.4916
20.001.0032
5.04 0.50 7.26 0.50 111.29832
5.04 1.01 14.52 1.01 222.59664
5.04 2.02 29.03 2.02 445.19328
5.04 1.01 14.52 1.01 222.59664
5.04 0.50 7.26 0.50 111.29832
20.001.0038
17.64 1.76 21.17 1.76 345.40884
17.64 3.53 42.34 3.53 690.81768
17.64 7.06 84.67 7.06 1381.63536
17.64 3.53 42.34 3.53 690.81768
17.64 1.76 21.17 1.76 345.40884
20.001.0039
17.64 1.76 16.93 1.76 301.3794
17.64 3.53 33.87 3.53 602.7588
17.64 7.06 67.74 7.06 1205.5176
17.64 3.53 33.87 3.53 602.7588
17.64 1.76 16.93 1.76 301.3794
20.001.0040
8.64 0.86 23.33 0.86 304.32672
8.64 1.73 46.66 1.73 608.65344
8.64 3.46 93.31 3.46 1217.30688
8.64 1.73 46.66 1.73 608.65344
8.64 0.86 23.33 0.86 304.32672
20.001.0041
35.28 3.53 74.09 3.53 1021.14432
35.28 7.06 148.18 7.06 2042.28864
35.28 14.11 296.35 14.11 4084.57728
35.28 7.06 148.18 7.06 2042.28864
35.28 3.53 74.09 3.53 1021.14432
20.001.0042
0.72 0.07 1.38 0.07 19.5264
0.72 0.14 2.76 0.14 39.0528
0.72 0.29 5.53 0.29 78.1056
0.72 0.14 2.76 0.14 39.0528
0.72 0.07 1.38 0.07 19.5264
20.001.0044
1.08 0.11 2.92 0.11 38.0538
1.08 0.22 5.83 0.22 76.1076
1.08 0.43 11.66 0.43 152.2152
1.08 0.22 5.83 0.22 76.1076
1.08 0.11 2.92 0.11 38.0538
20.001.0048
0.36 0.04 5.18 0.04 56.4516
0.36 0.07 10.37 0.07 112.9032
0.36 0.14 20.74 0.14 225.8064
0.36 0.07 10.37 0.07 112.9032
0.36 0.04 5.18 0.04 56.4516
20.001.0049
2.88 0.29 4.84 0.29 70.79616
2.88 0.58 9.68 0.58 141.59232
2.88 1.15 19.35 1.15 283.18464
2.88 0.58 9.68 0.58 141.59232
2.88 0.29 4.84 0.29 70.79616
20.001.0050
2.88 0.29 6.91 0.29 92.39616
2.88 0.58 13.82 0.58 184.79232
2.88 1.15 27.65 1.15 369.58464
2.88 0.58 13.82 0.58 184.79232
2.88 0.29 6.91 0.29 92.39616
20.001.0052
5.76 0.58 15.55 0.58 202.76352
5.76 1.15 31.10 1.15 405.52704
5.76 2.30 62.21 2.30 811.05408
5.76 1.15 31.10 1.15 405.52704
5.76 0.58 15.55 0.58 202.76352
20.001.0053
5.76 0.58 15.55 0.58 202.5792
5.76 1.15 31.10 1.15 405.1584
5.76 2.30 62.21 2.30 810.3168
5.76 1.15 31.10 1.15 405.1584
5.76 0.58 15.55 0.58 202.5792
20.001.00X2
4.32 0.43 13.74 0.43 216
4.32 0.86 27.48 0.86 432
4.32 1.73 54.95 1.73 864
4.32 0.86 27.48 0.86 432
4.32 0.43 13.74 0.43 216
20.001.00X3
0.36 0.04 1.14 0.04 18
0.36 0.07 2.29 0.07 36
0.36 0.14 4.58 0.14 72
0.36 0.07 2.29 0.07 36
0.36 0.04 1.14 0.04 18
20.005.0001
0.36 0.04 0.65 0.04 16.0416
0.36 0.07 1.30 0.07 32.0832
0.36 0.14 2.59 0.14 64.1664
0.36 0.07 1.30 0.07 32.0832
0.36 0.04 0.65 0.04 16.0416
20.005.0002
1.08 0.11 3.24 0.11 72.20772
1.08 0.22 6.48 0.22 144.41544
1.08 0.43 12.96 0.43 288.83088
1.08 0.22 6.48 0.22 144.41544
1.08 0.11 3.24 0.11 72.20772
20.008.0005
0.72 0.07 0.52 0.07 33.16248
0.72 0.14 1.04 0.14 66.32496
0.72 0.29 2.07 0.29 132.64992
0.72 0.14 1.04 0.14 66.32496
0.72 0.07 0.52 0.07 33.16248
40.002.0002
0.72 0.07 3.89 0.07 50.53032
0.72 0.14 7.78 0.14 101.06064
0.72 0.29 15.55 0.29 202.12128
0.72 0.14 7.78 0.14 101.06064
0.72 0.07 3.89 0.07 50.53032
40.002.0005
2.52 0.25 15.12 0.25 190.70856
2.52 0.50 30.24 0.50 381.41712
2.52 1.01 60.48 1.01 762.83424
2.52 0.50 30.24 0.50 381.41712
2.52 0.25 15.12 0.25 190.70856
60.001.0002
1.08 0.11 1.30 0.11 15.38136
1.08 0.22 2.59 0.22 30.76272
1.08 0.43 5.18 0.43 61.52544
1.08 0.22 2.59 0.22 30.76272
1.08 0.11 1.30 0.11 15.38136
60.001.0003
0.72 0.07 3.46 0.07 45.96552
0.72 0.14 6.91 0.14 91.93104
0.72 0.29 13.82 0.29 183.86208
0.72 0.14 6.91 0.14 91.93104
0.72 0.07 3.46 0.07 45.96552

20.001.0001
0.00 0.00 0.00 278.02 0
0.00 0.00 0.00 55.60 0
0.00 0.00 0.00 222.42 0
20.001.0002
203.96 101.98 101.98 278.02 1178.81077867
203.96 20.40 20.40 55.60 235.762155735
203.96 81.58 81.58 222.42 943.048622939
20.001.0101
0.00 0.00 0.00 278.02 0
0.00 0.00 0.00 55.60 0
0.00 0.00 0.00 222.42 0
20.001.0102
213.19 106.59 106.59 278.02 1234.41506069
213.19 21.32 21.32 55.60 246.883012137
213.19 85.27 85.27 222.42 987.53204855
20.001.0003
0.00 0.00 0.00 226.43 0
0.00 0.00 0.00 45.29 0
0.00 0.00 0.00 181.14 0
20.001.0004
142.38 71.19 71.19 226.43 826.468799919
142.38 14.24 14.24 45.29 165.293759984
142.38 56.95 56.95 181.14 661.175039935
20.001.0103
0.00 0.00 0.00 226.43 0
0.00 0.00 0.00 45.29 0
0.00 0.00 0.00 181.14 0
20.001.0104
148.85 74.43 74.43 226.43 864.961867313
148.85 14.89 14.89 45.29 172.992373463
148.85 59.54 59.54 181.14 691.96949385
20.001.0008
289.06 144.53 144.53 492.93 1671.03948242
289.06 28.91 28.91 98.59 334.207896484
289.06 115.62 115.62 394.35 1336.83158593
20.001.0108
302.27 151.13 151.13 492.93 1749.90860253
302.27 30.23 30.23 98.59 349.981720506
302.27 120.91 120.91 394.35 1399.92688203
20.001.0012
221.82 110.91 110.91 403.31 1282.51944186
221.82 22.18 22.18 80.66 256.503888371
221.82 88.73 88.73 322.65 1026.01555348
20.001.0112
231.90 115.95 115.95 403.31 1343.01564194
231.90 23.19 23.19 80.66 268.603128389
231.90 92.76 92.76 322.65 1074.41251355
20.002.0001
0.00 0.00 0.00 2,410.77 0
0.00 0.00 0.00 482.15 0
0.00 0.00 0.00 1,928.62 0
20.002.0002
1,515.89 757.95 757.95 2,410.77 8799.3105
1,515.89 151.59 151.59 482.15 1759.8621
1,515.89 606.36 606.36 1,928.62 7039.4484
40.001.0005
5,074.22 1,522.26 1,522.26 21,470.59 39720.5940022
5,074.22 761.13 761.13 10,735.30 19860.2970011
5,074.22 761.13 761.13 10,735.30 19860.2970011
5,074.22 2,029.69 2,029.69 28,627.46 52960.7920029
40.001.0006
1,786.25 535.88 535.88 7,558.20 13982.67
1,786.25 267.94 267.94 3,779.10 6991.335
1,786.25 267.94 267.94 3,779.10 6991.335
1,786.25 714.50 714.50 10,077.60 18643.56
40.001.0009
812.85 243.86 243.86 3,439.44 6362.96423035
812.85 121.93 121.93 1,719.72 3181.48211517
812.85 121.93 121.93 1,719.72 3181.48211517
812.85 325.14 325.14 4,585.92 8483.95230713
40.001.0010
1,588.59 476.58 476.58 6,721.80 12435.330018
1,588.59 238.29 238.29 3,360.90 6217.665009
1,588.59 238.29 238.29 3,360.90 6217.665009
1,588.59 635.43 635.43 8,962.40 16580.440024
40.001.0011
1,004.35 301.31 301.31 4,249.73 7861.99661572
1,004.35 150.65 150.65 2,124.86 3930.99830786
1,004.35 150.65 150.65 2,124.86 3930.99830786
1,004.35 401.74 401.74 5,666.30 10482.6621543
40.001.0027
671.11 201.33 201.33 2,839.68 5253.408
671.11 100.67 100.67 1,419.84 2626.704
671.11 100.67 100.67 1,419.84 2626.704
671.11 268.44 268.44 3,786.24 7004.544
40.002.2805
1,791.64 179.16 179.16 55.05 12681.9626256
1,791.64 358.33 358.33 110.11 25363.9252511
1,791.64 179.16 179.16 55.05 12681.9626256
1,791.64 627.07 627.07 192.68 44386.8691895
1,791.64 179.16 179.16 55.05 12681.9626256
1,791.64 89.58 89.58 27.53 6340.98131278
1,791.64 179.16 179.16 55.05 12681.9626256
40.002.2806
572.53 57.25 57.25 25.19 5264.2863
572.53 114.51 114.51 50.39 10528.5726
572.53 57.25 57.25 25.19 5264.2863
572.53 200.39 200.39 88.18 18425.00205
572.53 57.25 57.25 25.19 5264.2863
572.53 28.63 28.63 12.60 2632.14315
572.53 57.25 57.25 25.19 5264.2863
40.002.2809
1,273.61 127.36 127.36 5.73 2402.85019499
1,273.61 254.72 254.72 11.46 4805.70038997
1,273.61 127.36 127.36 5.73 2402.85019499
1,273.61 445.76 445.76 20.06 8409.97568245
1,273.61 127.36 127.36 5.73 2402.85019499
1,273.61 63.68 63.68 2.87 1201.42509749
1,273.61 127.36 127.36 5.73 2402.85019499
40.002.2810
943.53 94.35 94.35 8.96 2616.03493979
943.53 188.71 188.71 17.92 5232.06987957
943.53 94.35 94.35 8.96 2616.03493979
943.53 330.23 330.23 31.37 9156.12228925
943.53 94.35 94.35 8.96 2616.03493979
943.53 47.18 47.18 4.48 1308.01746989
943.53 94.35 94.35 8.96 2616.03493979
40.002.2811
6,033.99 603.40 603.40 17.71 12575.6531452
6,033.99 1,206.80 1,206.80 35.41 25151.3062905
6,033.99 603.40 603.40 17.71 12575.6531452
6,033.99 2,111.90 2,111.90 61.98 44014.7860083
6,033.99 603.40 603.40 17.71 12575.6531452
6,033.99 301.70 301.70 8.85 6287.82657262
6,033.99 603.40 603.40 17.71 12575.6531452
40.002.3527
837.94 83.79 83.79 7.89 2646.34512
837.94 167.59 167.59 15.78 5292.69024
837.94 83.79 83.79 7.89 2646.34512
837.94 293.28 293.28 27.61 9262.20792
837.94 83.79 83.79 7.89 2646.34512
837.94 41.90 41.90 3.94 1323.17256
837.94 83.79 83.79 7.89 2646.34512
60.002.1061
214.14 53.53 53.53 11.95 2417.20926
214.14 64.24 64.24 14.34 2900.651112
214.14 53.53 53.53 11.95 2417.20926
214.14 21.41 21.41 4.78 966.883704
214.14 21.41 21.41 4.78 966.883704

10.001.0003
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.001.0103
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.001.0203
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.001.0303
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.001.0403
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.001.0503
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.005.0003
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.006.0003
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.009.0003
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.009.0103
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.009.0203
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.001.2001
10.001.20010 0.00 0.00 0.00 0
10.001.20010 0.00 0.00 0.00 0
10.001.20010 0.00 0.00 0.00 0
10.002.2001
10.002.20010 0.00 0.00 0.00 0
10.002.20010 0.00 0.00 0.00 0
10.002.20010 0.00 0.00 0.00 0

30.001.5016
132.00 13.20 13.20 0.03 118.99456
132.00 52.80 52.80 0.14 475.97824
132.00 26.40 26.40 0.07 237.98912
132.00 26.40 26.40 0.07 237.98912
132.00 13.20 13.20 0.03 118.99456
30.001.5017
66.00 6.60 6.60 0.03 118.99456
66.00 26.40 26.40 0.14 475.97824
66.00 13.20 13.20 0.07 237.98912
66.00 13.20 13.20 0.07 237.98912
66.00 6.60 6.60 0.03 118.99456
30.001.5018
0.00 0.00 0.00 0.03 118.99456
0.00 0.00 0.00 0.14 475.97824
0.00 0.00 0.00 0.07 237.98912
0.00 0.00 0.00 0.07 237.98912
0.00 0.00 0.00 0.03 118.99456
60.001.1707
0.00 0.00 0.00 0.03 178.49184
0.00 0.00 0.00 0.20 1070.95104
0.00 0.00 0.00 0.07 356.98368
0.00 0.00 0.00 0.03 178.49184
60.001.1708
0.00 0.00 0.00 0.03 54.08856
0.00 0.00 0.00 0.20 324.53136
0.00 0.00 0.00 0.07 108.17712
0.00 0.00 0.00 0.03 54.08856
70.001.3801
0.00 0.00 0.00 0.03 120.92202
0.00 0.00 0.00 0.20 725.53212
0.00 0.00 0.00 0.07 241.84404
0.00 0.00 0.00 0.03 120.92202
70.001.3802
0.00 0.00 0.00 0.03 96.73748
0.00 0.00 0.00 0.20 580.42488
0.00 0.00 0.00 0.07 193.47496
0.00 0.00 0.00 0.03 96.73748
70.001.3803
90.00 9.00 9.00 0.03 162.26534
90.00 54.00 54.00 0.20 973.59204
90.00 18.00 18.00 0.07 324.53068
90.00 9.00 9.00 0.03 162.26534
70.001.3804
72.00 7.20 7.20 0.03 129.81234
72.00 43.20 43.20 0.20 778.87404
72.00 14.40 14.40 0.07 259.62468
72.00 7.20 7.20 0.03 129.81234
80.001.218
10,480.23 1,048.02 1,048.02 0.03 6.8
10,480.23 2,096.05 2,096.05 0.07 13.6
10,480.23 3,144.07 3,144.07 0.10 20.4
10,480.23 1,048.02 1,048.02 0.03 6.8
10,480.23 2,096.05 2,096.05 0.07 13.6
10,480.23 1,048.02 1,048.02 0.03 6.8
80.001.253
24,439.53 2,443.95 2,443.95 81.10 16220
24,439.53 4,887.91 4,887.91 162.20 32440
24,439.53 7,331.86 7,331.86 243.30 48660
24,439.53 2,443.95 2,443.95 81.10 16220
24,439.53 4,887.91 4,887.91 162.20 32440
24,439.53 2,443.95 2,443.95 81.10 16220
80.001.255
0.00 0.00 0.00 0.10 20
0.00 0.00 0.00 0.20 40
0.00 0.00 0.00 0.30 60
0.00 0.00 0.00 0.10 20
0.00 0.00 0.00 0.20 40
0.00 0.00 0.00 0.10 20
80.001.258
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.259
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.260
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
80.001.263
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.264
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.265
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.266
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.267
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.270
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.271
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.272
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.273
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.274
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.275
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.276
7,391.74 739.17 739.17 0.10 20
7,391.74 1,478.35 1,478.35 0.20 40
7,391.74 2,217.52 2,217.52 0.30 60
7,391.74 739.17 739.17 0.10 20
7,391.74 1,478.35 1,478.35 0.20 40
7,391.74 739.17 739.17 0.10 20

20.001.0003
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0015
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0016
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0020
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0031
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0032
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0038
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0039
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0040
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0041
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0042
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0044
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0048
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0049
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0050
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0052
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0053
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.00X2
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.00X3
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.005.0001
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.005.0002
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.008.0005
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
40.002.0002
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
40.002.0005
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
60.001.0002
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
60.001.0003
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0

20.001.0001
0.00 0.00 0.00 278.02 0
0.00 0.00 0.00 55.60 0
0.00 0.00 0.00 222.42 0
20.001.0002
203.96 101.98 101.98 278.02 1178.81077867
203.96 20.40 20.40 55.60 235.762155735
203.96 81.58 81.58 222.42 943.048622939
20.001.0101
0.00 0.00 0.00 278.02 0
0.00 0.00 0.00 55.60 0
0.00 0.00 0.00 222.42 0
20.001.0102
213.19 106.59 106.59 278.02 1234.41506069
213.19 21.32 21.32 55.60 246.883012137
213.19 85.27 85.27 222.42 987.53204855
20.001.0003
0.00 0.00 0.00 226.43 0
0.00 0.00 0.00 45.29 0
0.00 0.00 0.00 181.14 0
20.001.0004
142.38 71.19 71.19 226.43 826.468799919
142.38 14.24 14.24 45.29 165.293759984
142.38 56.95 56.95 181.14 661.175039935
20.001.0103
0.00 0.00 0.00 226.43 0
0.00 0.00 0.00 45.29 0
0.00 0.00 0.00 181.14 0
20.001.0104
148.85 74.43 74.43 226.43 864.961867313
148.85 14.89 14.89 45.29 172.992373463
148.85 59.54 59.54 181.14 691.96949385
20.001.0008
289.06 144.53 144.53 492.93 1671.03948242
289.06 28.91 28.91 98.59 334.207896484
289.06 115.62 115.62 394.35 1336.83158593
20.001.0108
302.27 151.13 151.13 492.93 1749.90860253
302.27 30.23 30.23 98.59 349.981720506
302.27 120.91 120.91 394.35 1399.92688203
20.001.0012
221.82 110.91 110.91 403.31 1282.51944186
221.82 22.18 22.18 80.66 256.503888371
221.82 88.73 88.73 322.65 1026.01555348
20.001.0112
231.90 115.95 115.95 403.31 1343.01564194
231.90 23.19 23.19 80.66 268.603128389
231.90 92.76 92.76 322.65 1074.41251355
20.002.0001
0.00 0.00 0.00 2,410.77 0
0.00 0.00 0.00 482.15 0
0.00 0.00 0.00 1,928.62 0
20.002.0002
1,515.89 757.95 757.95 2,410.77 8799.3105
1,515.89 151.59 151.59 482.15 1759.8621
1,515.89 606.36 606.36 1,928.62 7039.4484
40.001.0005
5,074.22 1,522.26 1,522.26 21,470.59 39720.5940022
5,074.22 761.13 761.13 10,735.30 19860.2970011
5,074.22 761.13 761.13 10,735.30 19860.2970011
5,074.22 2,029.69 2,029.69 28,627.46 52960.7920029
40.001.0006
1,786.25 535.88 535.88 7,558.20 13982.67
1,786.25 267.94 267.94 3,779.10 6991.335
1,786.25 267.94 267.94 3,779.10 6991.335
1,786.25 714.50 714.50 10,077.60 18643.56
40.001.0009
812.85 243.86 243.86 3,439.44 6362.96423035
812.85 121.93 121.93 1,719.72 3181.48211517
812.85 121.93 121.93 1,719.72 3181.48211517
812.85 325.14 325.14 4,585.92 8483.95230713
40.001.0010
1,588.59 476.58 476.58 6,721.80 12435.330018
1,588.59 238.29 238.29 3,360.90 6217.665009
1,588.59 238.29 238.29 3,360.90 6217.665009
1,588.59 635.43 635.43 8,962.40 16580.440024
40.001.0011
1,004.35 301.31 301.31 4,249.73 7861.99661572
1,004.35 150.65 150.65 2,124.86 3930.99830786
1,004.35 150.65 150.65 2,124.86 3930.99830786
1,004.35 401.74 401.74 5,666.30 10482.6621543
40.001.0027
671.11 201.33 201.33 2,839.68 5253.408
671.11 100.67 100.67 1,419.84 2626.704
671.11 100.67 100.67 1,419.84 2626.704
671.11 268.44 268.44 3,786.24 7004.544
40.002.2805
1,791.64 179.16 179.16 55.05 12681.9626256
1,791.64 358.33 358.33 110.11 25363.9252511
1,791.64 179.16 179.16 55.05 12681.9626256
1,791.64 627.07 627.07 192.68 44386.8691895
1,791.64 179.16 179.16 55.05 12681.9626256
1,791.64 89.58 89.58 27.53 6340.98131278
1,791.64 179.16 179.16 55.05 12681.9626256
40.002.2806
572.53 57.25 57.25 25.19 5264.2863
572.53 114.51 114.51 50.39 10528.5726
572.53 57.25 57.25 25.19 5264.2863
572.53 200.39 200.39 88.18 18425.00205
572.53 57.25 57.25 25.19 5264.2863
572.53 28.63 28.63 12.60 2632.14315
572.53 57.25 57.25 25.19 5264.2863
40.002.2809
1,273.61 127.36 127.36 5.73 2402.85019499
1,273.61 254.72 254.72 11.46 4805.70038997
1,273.61 127.36 127.36 5.73 2402.85019499
1,273.61 445.76 445.76 20.06 8409.97568245
1,273.61 127.36 127.36 5.73 2402.85019499
1,273.61 63.68 63.68 2.87 1201.42509749
1,273.61 127.36 127.36 5.73 2402.85019499
40.002.2810
943.53 94.35 94.35 8.96 2616.03493979
943.53 188.71 188.71 17.92 5232.06987957
943.53 94.35 94.35 8.96 2616.03493979
943.53 330.23 330.23 31.37 9156.12228925
943.53 94.35 94.35 8.96 2616.03493979
943.53 47.18 47.18 4.48 1308.01746989
943.53 94.35 94.35 8.96 2616.03493979
40.002.2811
6,033.99 603.40 603.40 17.71 12575.6531452
6,033.99 1,206.80 1,206.80 35.41 25151.3062905
6,033.99 603.40 603.40 17.71 12575.6531452
6,033.99 2,111.90 2,111.90 61.98 44014.7860083
6,033.99 603.40 603.40 17.71 12575.6531452
6,033.99 301.70 301.70 8.85 6287.82657262
6,033.99 603.40 603.40 17.71 12575.6531452
40.002.3527
837.94 83.79 83.79 7.89 2646.34512
837.94 167.59 167.59 15.78 5292.69024
837.94 83.79 83.79 7.89 2646.34512
837.94 293.28 293.28 27.61 9262.20792
837.94 83.79 83.79 7.89 2646.34512
837.94 41.90 41.90 3.94 1323.17256
837.94 83.79 83.79 7.89 2646.34512
60.002.1061
214.14 53.53 53.53 11.95 2417.20926
214.14 64.24 64.24 14.34 2900.651112
214.14 53.53 53.53 11.95 2417.20926
214.14 21.41 21.41 4.78 966.883704
214.14 21.41 21.41 4.78 966.883704

10.001.0003
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.001.0103
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.001.0203
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.001.0303
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.001.0403
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.001.0503
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.005.0003
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.006.0003
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.009.0003
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.009.0103
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
10.009.0203
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0

10.001.2001
10.001.20010 0.00 0.00 0.00 0
10.001.20010 0.00 0.00 0.00 0
10.001.20010 0.00 0.00 0.00 0
10.002.2001
10.002.20010 0.00 0.00 0.00 0
10.002.20010 0.00 0.00 0.00 0
10.002.20010 0.00 0.00 0.00 0

30.001.5016
0.00 0.00 0.00 0.03 118.99456
0.00 0.00 0.00 0.14 475.97824
0.00 0.00 0.00 0.07 237.98912
0.00 0.00 0.00 0.07 237.98912
0.00 0.00 0.00 0.03 118.99456
30.001.5017
66.00 6.60 6.60 0.03 118.99456
66.00 26.40 26.40 0.14 475.97824
66.00 13.20 13.20 0.07 237.98912
66.00 13.20 13.20 0.07 237.98912
66.00 6.60 6.60 0.03 118.99456
30.001.5018
132.00 13.20 13.20 0.03 118.99456
132.00 52.80 52.80 0.14 475.97824
132.00 26.40 26.40 0.07 237.98912
132.00 26.40 26.40 0.07 237.98912
132.00 13.20 13.20 0.03 118.99456
60.001.1707
0.00 0.00 0.00 0.03 178.49184
0.00 0.00 0.00 0.20 1070.95104
0.00 0.00 0.00 0.07 356.98368
0.00 0.00 0.00 0.03 178.49184
60.001.1708
0.00 0.00 0.00 0.03 54.08856
0.00 0.00 0.00 0.20 324.53136
0.00 0.00 0.00 0.07 108.17712
0.00 0.00 0.00 0.03 54.08856
70.001.3801
0.00 0.00 0.00 0.03 120.92202
0.00 0.00 0.00 0.20 725.53212
0.00 0.00 0.00 0.07 241.84404
0.00 0.00 0.00 0.03 120.92202
70.001.3802
0.00 0.00 0.00 0.03 96.73748
0.00 0.00 0.00 0.20 580.42488
0.00 0.00 0.00 0.07 193.47496
0.00 0.00 0.00 0.03 96.73748
70.001.3803
90.00 9.00 9.00 0.03 162.26534
90.00 54.00 54.00 0.20 973.59204
90.00 18.00 18.00 0.07 324.53068
90.00 9.00 9.00 0.03 162.26534
70.001.3804
72.00 7.20 7.20 0.03 129.81234
72.00 43.20 43.20 0.20 778.87404
72.00 14.40 14.40 0.07 259.62468
72.00 7.20 7.20 0.03 129.81234
80.001.218
10,480.23 1,048.02 1,048.02 0.03 6.8
10,480.23 2,096.05 2,096.05 0.07 13.6
10,480.23 3,144.07 3,144.07 0.10 20.4
10,480.23 1,048.02 1,048.02 0.03 6.8
10,480.23 2,096.05 2,096.05 0.07 13.6
10,480.23 1,048.02 1,048.02 0.03 6.8
80.001.253
24,439.53 2,443.95 2,443.95 81.10 16220
24,439.53 4,887.91 4,887.91 162.20 32440
24,439.53 7,331.86 7,331.86 243.30 48660
24,439.53 2,443.95 2,443.95 81.10 16220
24,439.53 4,887.91 4,887.91 162.20 32440
24,439.53 2,443.95 2,443.95 81.10 16220
80.001.255
0.00 0.00 0.00 0.10 20
0.00 0.00 0.00 0.20 40
0.00 0.00 0.00 0.30 60
0.00 0.00 0.00 0.10 20
0.00 0.00 0.00 0.20 40
0.00 0.00 0.00 0.10 20
80.001.258
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.259
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.260
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
80.001.263
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.264
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.265
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.266
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.267
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.270
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.271
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.272
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.273
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.274
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.275
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.10 20.4
0.00 0.00 0.00 0.03 6.8
0.00 0.00 0.00 0.07 13.6
0.00 0.00 0.00 0.03 6.8
80.001.276
7,391.74 739.17 739.17 0.10 20
7,391.74 1,478.35 1,478.35 0.20 40
7,391.74 2,217.52 2,217.52 0.30 60
7,391.74 739.17 739.17 0.10 20
7,391.74 1,478.35 1,478.35 0.20 40
7,391.74 739.17 739.17 0.10 20

20.001.0003
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0015
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0016
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0020
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0031
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0032
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0038
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0039
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0040
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0041
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0042
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0044
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0048
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0049
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0050
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0052
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.0053
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.00X2
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.001.00X3
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.005.0001
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.005.0002
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
20.008.0005
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
40.002.0002
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
40.002.0005
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
60.001.0002
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
60.001.0003
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0

20.001.0003
0.00 0.00 0.00 91.69 0
0.00 0.00 0.00 18.34 0
0.00 0.00 0.00 73.35 0
20.001.0004
57.65 28.83 28.83 91.69 334.659385443
57.65 5.77 5.77 18.34 66.9318770885
57.65 23.06 23.06 73.35 267.727508354
20.001.0103
0.00 0.00 0.00 91.69 0
0.00 0.00 0.00 18.34 0
0.00 0.00 0.00 73.35 0
20.001.0104
60.28 30.14 30.14 91.69 350.246260929
60.28 6.03 6.03 18.34 70.0492521858
60.28 24.11 24.11 73.35 280.197008743
20.001.0008
17.92 8.96 8.96 30.56 103.606878233
17.92 1.79 1.79 6.11 20.7213756466
17.92 7.17 7.17 24.45 82.8855025864
20.001.0108
18.74 9.37 9.37 30.56 108.496878386
18.74 1.87 1.87 6.11 21.6993756771
18.74 7.50 7.50 24.45 86.7975027084
20.002.0001
0.00 0.00 0.00 180.50 0
0.00 0.00 0.00 36.10 0
0.00 0.00 0.00 144.40 0
20.002.0002
113.50 56.75 56.75 180.50 658.825
113.50 11.35 11.35 36.10 131.765
113.50 45.40 45.40 144.40 527.06
40.001.0008
450.71 135.21 135.21 1,907.10 3528.13511009
450.71 67.61 67.61 953.55 1764.06755505
450.71 67.61 67.61 953.55 1764.06755505
450.71 180.28 180.28 2,542.80 4704.18014679
40.001.0040
322.88 96.86 96.86 1,366.20 2527.47
322.88 48.43 48.43 683.10 1263.735
322.88 48.43 48.43 683.10 1263.735
322.88 129.15 129.15 1,821.60 3369.96
40.002.2808
654.74 65.47 65.47 4.89 1636.63415107
654.74 130.95 130.95 9.78 3273.26830214
654.74 65.47 65.47 4.89 1636.63415107
654.74 229.16 229.16 17.12 5728.21952874
654.74 65.47 65.47 4.89 1636.63415107
654.74 32.74 32.74 2.45 818.317075535
654.74 65.47 65.47 4.89 1636.63415107
40.002.2840
171.64 17.16 17.16 4.14 916.8444
171.64 34.33 34.33 8.28 1833.6888
171.64 17.16 17.16 4.14 916.8444
171.64 60.07 60.07 14.49 3208.9554
171.64 17.16 17.16 4.14 916.8444
171.64 8.58 8.58 2.07 458.4222
171.64 17.16 17.16 4.14 916.8444
60.002.1061
11.20 2.80 2.80 0.63 126.4125
11.20 3.36 3.36 0.75 151.695
11.20 2.80 2.80 0.63 126.4125
11.20 1.12 1.12 0.25 50.565
11.20 1.12 1.12 0.25 50.565

20.004.0005
373.46 336.11 14.15 0.90 336.114
373.46 37.35 1.57 0.10 37.346
20.004.0007
684.68 616.21 25.95 0.90 616.212
684.68 68.47 2.88 0.10 68.468
20.004.0015
63.96 57.56 2.10 0.90 57.564
63.96 6.40 0.23 0.10 6.396
20.004.0025
84.00 75.60 2.76 2.70 75.6
84.00 8.40 0.31 0.30 8.4
20.004.0028
50.48 45.43 0.00 0.90 45.432
50.48 5.05 0.00 0.10 5.048
20.004.0030
63.96 57.56 0.00 0.90 57.564
63.96 6.40 0.00 0.10 6.396
20.004.0044
56.00 50.40 1.84 1.80 50.4
56.00 5.60 0.20 0.20 5.6
20.004.0066
56.00 50.40 1.84 1.80 50.4
56.00 5.60 0.20 0.20 5.6
20.004.0068
0.00 0.00 0.00 1.80 0
0.00 0.00 0.00 0.20 0
20.004.0070
63.96 57.56 2.10 0.90 57.564
63.96 6.40 0.23 0.10 6.396
20.004.0076
56.00 50.40 1.84 1.80 50.4
56.00 5.60 0.20 0.20 5.6
20.004.0078
100.96 90.86 3.31 1.80 90.864
100.96 10.10 0.37 0.20 10.096
20.004.0080
63.96 57.56 2.10 0.90 57.564
63.96 6.40 0.23 0.10 6.396
20.004.0114
50.48 45.43 1.66 0.90 45.432
50.48 5.05 0.18 0.10 5.048
30.001.0010
1,144.56 1,030.10 54.19 7.20 1030.104
1,144.56 114.46 6.02 0.80 114.456
40.001.0003
0.00 0.00 0.00 7.20 0
0.00 0.00 0.00 0.80 0
40.001.0008
0.00 0.00 0.00 18.00 0
0.00 0.00 0.00 2.00 0
40.001.0014
0.00 0.00 0.00 3.60 0
0.00 0.00 0.00 0.40 0
40.001.0025
0.00 0.00 0.00 7.20 0
0.00 0.00 0.00 0.80 0
40.007.0019
674.54 607.09 32.42 9.98 607.089483
674.54 67.45 3.60 1.11 67.454387
60.101.0003
323.64 291.28 15.36 5.40 291.276
323.64 32.36 1.71 0.60 32.364
60.101.0008
547.24 492.52 18.18 1.80 492.516
547.24 54.72 2.02 0.20 54.724
60.101.0012
371.82 334.64 17.25 2.70 334.638
371.82 37.18 1.92 0.30 37.182
60.101.0018
729.68 656.71 39.04 7.20 656.712
729.68 72.97 4.34 0.80 72.968
60.101.0020
439.20 395.28 22.27 2.70 395.28
439.20 43.92 2.47 0.30 43.92
20.001.0020
1,261.04 1,134.94 53.85 9.98 1134.936972
1,261.04 126.10 5.98 1.11 126.104108
20.001.0044
1,265.50 1,138.95 41.51 5.50 1138.949325
1,265.50 126.55 4.61 0.61 126.549925
20.001.0049
896.35 806.72 29.40 7.57 806.718906
896.35 89.64 3.27 0.84 89.635434
20.003.0056
316.37 284.73 14.15 0.90 284.733
316.37 31.64 1.57 0.10 31.637
20.003.0069
120.84 108.76 4.84 3.60 108.756
120.84 12.08 0.54 0.40 12.084
20.003.0077
456.00 410.40 18.64 7.20 410.4
456.00 45.60 2.07 0.80 45.6
30.001.0010
265.10 238.59 11.01 1.80 238.59
265.10 26.51 1.22 0.20 26.51
40.006.0019
96.59 86.93 4.13 9.98 86.926671
96.59 9.66 0.46 1.11 9.658519

20.001.0029
1.00 0.10 2.70 0.10 35.205
1.00 0.20 5.40 0.20 70.41
1.00 0.40 10.80 0.40 140.82
1.00 0.20 5.40 0.20 70.41
1.00 0.10 2.70 0.10 35.205
20.001.0035
1.00 0.10 2.70 0.10 35.17
1.00 0.20 5.40 0.20 70.34
1.00 0.40 10.80 0.40 140.68
1.00 0.20 5.40 0.20 70.34
1.00 0.10 2.70 0.10 35.17
20.001.00X4
1.00 0.10 3.18 0.10 50
1.00 0.20 6.36 0.20 100
1.00 0.40 12.72 0.40 200
1.00 0.20 6.36 0.20 100
1.00 0.10 3.18 0.10 50
25.001.0001
1,502.53 1,502.53 45.18 105.07 1502.5296 0.02
25.001.0002
128.70 128.70 3.87 9.00 128.7 0.02
25.003.0001
2,607.19 2,607.19 194.04 117.60 2607.192 0.13
30.002.0001
2,994.55 2,994.55 184.93 105.07 2994.552 0.13
30.002.0002
256.50 256.50 15.84 9.00 256.5 0.13
30.003.0004
6,117.55 6,117.55 412.78 117.60 6117.552 0.33

20.001.0003
0.00 0.00 0.00 125.00 0
0.00 0.00 0.00 25.00 0
0.00 0.00 0.00 100.00 0
20.001.0004
78.60 39.30 39.30 125.00 456.25
78.60 7.86 7.86 25.00 91.25
78.60 31.44 31.44 100.00 365
20.001.0103
0.00 0.00 0.00 125.00 0
0.00 0.00 0.00 25.00 0
0.00 0.00 0.00 100.00 0
20.001.0104
82.18 41.09 41.09 125.00 477.5
82.18 8.22 8.22 25.00 95.5
82.18 32.87 32.87 100.00 382
20.001.0008
29.32 14.66 14.66 50.00 169.5
29.32 2.93 2.93 10.00 33.9
29.32 11.73 11.73 40.00 135.6
20.001.0108
30.66 15.33 15.33 50.00 177.5
30.66 3.07 3.07 10.00 35.5
30.66 12.26 12.26 40.00 142
20.002.0001
0.00 0.00 0.00 100.00 0
0.00 0.00 0.00 20.00 0
0.00 0.00 0.00 80.00 0
20.002.0002
62.88 31.44 31.44 100.00 365
62.88 6.29 6.29 20.00 73
62.88 25.15 25.15 80.00 292
40.001.0008
170.16 51.05 51.05 720.00 1332
170.16 25.52 25.52 360.00 666
170.16 25.52 25.52 360.00 666
170.16 68.06 68.06 960.00 1776
40.001.0026
43.96 13.19 13.19 186.00 344.1
43.96 6.59 6.59 93.00 172.05
43.96 6.59 6.59 93.00 172.05
43.96 17.58 17.58 248.00 458.8
40.001.0040
514.03 154.21 154.21 2,175.00 4023.75
514.03 77.10 77.10 1,087.50 2011.875
514.03 77.10 77.10 1,087.50 2011.875
514.03 205.61 205.61 2,900.00 5365
40.002.2808
267.92 26.79 26.79 2.00 669.71469
267.92 53.58 53.58 4.00 1339.42938
267.92 26.79 26.79 2.00 669.71469
267.92 93.77 93.77 7.00 2344.001415
267.92 26.79 26.79 2.00 669.71469
267.92 13.40 13.40 1.00 334.857345
267.92 26.79 26.79 2.00 669.71469
40.002.2826
136.64 13.66 13.66 0.51 252.43568
136.64 27.33 27.33 1.03 504.87136
136.64 13.66 13.66 0.51 252.43568
136.64 47.83 47.83 1.80 883.52488
136.64 13.66 13.66 0.51 252.43568
136.64 6.83 6.83 0.26 126.21784
136.64 13.66 13.66 0.51 252.43568
40.002.2840
300.61 30.06 30.06 7.25 1605.80646
300.61 60.12 60.12 14.50 3211.61292
300.61 135.28 135.28 32.63 7226.12907
300.61 30.06 30.06 7.25 1605.80646
300.61 15.03 15.03 3.63 802.90323
300.61 30.06 30.06 7.25 1605.80646
60.002.1061
22.40 5.60 5.60 1.25 252.825
22.40 6.72 6.72 1.50 303.39
22.40 5.60 5.60 1.25 252.825
22.40 2.24 2.24 0.50 101.13
22.40 2.24 2.24 0.50 101.13

20.001.0003
0.00 0.00 0.00 89.74 0
0.00 0.00 0.00 17.95 0
0.00 0.00 0.00 71.79 0
20.001.0004
56.43 28.21 28.21 89.74 327.54188244
56.43 5.64 5.64 17.95 65.5083764881
56.43 22.57 22.57 71.79 262.033505952
20.001.0103
0.00 0.00 0.00 89.74 0
0.00 0.00 0.00 17.95 0
0.00 0.00 0.00 71.79 0
20.001.0104
58.99 29.50 29.50 89.74 342.797257787
58.99 5.90 5.90 17.95 68.5594515574
58.99 23.60 23.60 71.79 274.23780623
20.001.0008
17.54 8.77 8.77 29.91 101.403377303
17.54 1.75 1.75 5.98 20.2806754607
17.54 7.02 7.02 23.93 81.1227018428
20.001.0108
18.34 9.17 9.17 29.91 106.189377412
18.34 1.83 1.83 5.98 21.2378754824
18.34 7.34 7.34 23.93 84.9515019298
20.002.0001
0.00 0.00 0.00 666.50 0
0.00 0.00 0.00 133.30 0
0.00 0.00 0.00 533.20 0
20.002.0002
419.10 209.55 209.55 666.50 2432.725
419.10 41.91 41.91 133.30 486.545
419.10 167.64 167.64 533.20 1946.18
40.001.0005
926.58 277.98 277.98 3,920.67 7253.23941193
926.58 138.99 138.99 1,960.33 3626.61970596
926.58 138.99 138.99 1,960.33 3626.61970596
926.58 370.63 370.63 5,227.56 9670.98588257
40.001.0008
441.13 132.34 132.34 1,866.54 3453.09907844
441.13 66.17 66.17 933.27 1726.54953922
441.13 66.17 66.17 933.27 1726.54953922
441.13 176.45 176.45 2,488.72 4604.13210459
40.001.0040
572.45 171.73 171.73 2,422.20 4481.07009315
572.45 85.87 85.87 1,211.10 2240.53504658
572.45 85.87 85.87 1,211.10 2240.53504658
572.45 228.98 228.98 3,229.60 5974.76012421
40.001.0069
1,974.03 592.21 592.21 8,352.72 15452.5319881
1,974.03 296.10 296.10 4,176.36 7726.26599407
1,974.03 296.10 296.10 4,176.36 7726.26599407
1,974.03 789.61 789.61 11,136.96 20603.3759842
40.002.2169
10,743.99 1,074.40 1,074.40 27.84 18624.8950417
10,743.99 2,148.80 2,148.80 55.68 37249.7900834
10,743.99 1,074.40 1,074.40 27.84 18624.8950417
10,743.99 3,760.40 3,760.40 97.45 65187.132646
10,743.99 1,074.40 1,074.40 27.84 18624.8950417
10,743.99 537.20 537.20 13.92 9312.44752085
10,743.99 1,074.40 1,074.40 27.84 18624.8950417
40.002.2805
327.16 32.72 32.72 10.05 2315.80905188
327.16 65.43 65.43 20.11 4631.61810376
327.16 147.22 147.22 45.24 10421.1407335
327.16 32.72 32.72 10.05 2315.80905188
327.16 16.36 16.36 5.03 1157.90452594
327.16 32.72 32.72 10.05 2315.80905188
40.002.2808
640.81 64.08 64.08 4.79 1601.82637639
640.81 128.16 128.16 9.57 3203.65275277
640.81 64.08 64.08 4.79 1601.82637639
640.81 224.28 224.28 16.75 5606.39231735
640.81 64.08 64.08 4.79 1601.82637639
640.81 32.04 32.04 2.39 800.913188194
640.81 64.08 64.08 4.79 1601.82637639
40.002.2840
304.30 30.43 30.43 7.34 1625.51643379
304.30 60.86 60.86 14.68 3251.03286758
304.30 136.94 136.94 33.03 7314.82395206
304.30 30.43 30.43 7.34 1625.51643379
304.30 15.22 15.22 3.67 812.758216896
304.30 30.43 30.43 7.34 1625.51643379
60.002.1061
43.70 10.92 10.92 2.44 493.261583801
43.70 13.11 13.11 2.93 591.913900561
43.70 10.92 10.92 2.44 493.261583801
43.70 4.37 4.37 0.98 197.30463352
43.70 4.37 4.37 0.98 197.30463352

20.004.0001
248.97 224.07 9.43 0.90 224.073
248.97 24.90 1.05 0.10 24.897
20.004.0005
373.46 336.11 14.15 0.90 336.114
373.46 37.35 1.57 0.10 37.346
20.004.0043
55.32 49.79 1.81 3.60 49.788
55.32 5.53 0.20 0.40 5.532
20.004.0046
71.92 64.73 2.36 3.60 64.728
71.92 7.19 0.26 0.40 7.192
20.004.0064
13.83 12.45 0.45 0.90 12.447
13.83 1.38 0.05 0.10 1.383
20.004.0066
28.00 25.20 0.92 0.90 25.2
28.00 2.80 0.10 0.10 2.8
20.004.0071
53.94 48.55 1.77 2.70 48.546
53.94 5.39 0.20 0.30 5.394
20.004.0074
13.83 12.45 0.45 0.90 12.447
13.83 1.38 0.05 0.10 1.383
20.004.0075
53.94 48.55 1.77 2.70 48.546
53.94 5.39 0.20 0.30 5.394
20.004.0076
28.00 25.20 0.92 0.90 25.2
28.00 2.80 0.10 0.10 2.8
30.001.0002
4,605.44 4,144.90 290.30 14.40 4144.896
4,605.44 460.54 32.26 1.60 460.544
30.001.0003
316.82 285.14 14.03 0.90 285.138
316.82 31.68 1.56 0.10 31.682
30.001.0004
445.54 400.99 24.92 0.90 400.986
445.54 44.55 2.77 0.10 44.554
30.001.0010
1,573.77 1,416.39 74.51 9.90 1416.393
1,573.77 157.38 8.28 1.10 157.377
30.001.0011
2,780.10 2,502.09 168.78 8.10 2502.09
2,780.10 278.01 18.75 0.90 278.01
30.001.0012
541.30 487.17 27.67 1.80 487.17
541.30 54.13 3.07 0.20 54.13
30.001.0016
1,683.88 1,515.49 74.95 19.80 1515.492
1,683.88 168.39 8.33 2.20 168.388
40.001.0012
0.00 0.00 0.00 19.80 0
0.00 0.00 0.00 2.20 0
40.001.0014
0.00 0.00 0.00 2.70 0
0.00 0.00 0.00 0.30 0
40.001.0025
0.00 0.00 0.00 4.50 0
0.00 0.00 0.00 0.50 0
40.007.0013
352.46 317.22 19.71 5.19 317.215386
352.46 35.25 2.19 0.58 35.246154
40.007.0015
2,109.46 1,898.52 132.96 23.97 1898.516898
2,109.46 210.95 14.77 2.66 210.946322
40.007.0016
878.38 790.54 55.37 9.78 790.53912
878.38 87.84 6.15 1.09 87.83768
40.007.0019
953.63 858.27 45.83 14.11 858.268719
953.63 95.36 5.09 1.57 95.363191
40.007.0020
192.99 173.69 12.16 2.77 173.694456
192.99 19.30 1.35 0.31 19.299384
40.007.0024
1,305.60 1,175.04 64.12 34.56 1175.04
1,305.60 130.56 7.12 3.84 130.56
60.101.0014
198.30 178.47 9.41 4.50 178.47
198.30 19.83 1.05 0.50 19.83
60.101.0015
246.60 221.94 12.39 4.50 221.94
246.60 24.66 1.38 0.50 24.66
60.101.0017
626.04 563.44 31.44 5.40 563.436
626.04 62.60 3.49 0.60 62.604
60.101.0018
820.89 738.80 43.92 8.10 738.801
820.89 82.09 4.88 0.90 82.089
60.101.0021
1,433.90 1,290.51 74.67 4.50 1290.51
1,433.90 143.39 8.30 0.50 143.39
20.001.0014
880.48 792.43 33.36 7.20 792.432
880.48 88.05 3.71 0.80 88.048
20.001.0016
5,726.37 5,153.73 221.34 23.97 5153.733774
5,726.37 572.64 24.59 2.66 572.637086
20.001.0017
2,796.89 2,517.20 108.11 9.78 2517.201792
2,796.89 279.69 12.01 1.09 279.689088
20.001.0020
1,782.79 1,604.51 76.13 14.11 1604.509596
1,782.79 178.28 8.46 1.57 178.278844
20.001.0021
505.19 454.67 19.53 2.77 454.672413
505.19 50.52 2.17 0.31 50.519157
20.001.0025
2,055.55 1,850.00 88.97 34.56 1849.9968
2,055.55 205.56 9.89 3.84 205.5552
20.001.0047
849.08 764.17 27.85 12.76 764.168706
849.08 84.91 3.09 1.42 84.907634
20.001.0051
806.42 725.78 26.45 9.54 725.776263
806.42 80.64 2.94 1.06 80.641807
20.003.0018
25.93 23.34 0.98 0.90 23.337
25.93 2.59 0.11 0.10 2.593
20.003.0028
17.58 15.82 0.79 0.90 15.822
17.58 1.76 0.09 0.10 1.758
20.003.0054
85.14 76.63 4.13 0.90 76.626
85.14 8.51 0.46 0.10 8.514
20.003.0057
793.61 714.25 30.07 0.90 714.249
793.61 79.36 3.34 0.10 79.361
20.003.0058
684.68 616.21 25.95 0.90 616.212
684.68 68.47 2.88 0.10 68.468
20.003.0063
59.86 53.87 2.31 0.90 53.874
59.86 5.99 0.26 0.10 5.986
20.003.0065
217.60 195.84 9.55 7.20 195.84
217.60 21.76 1.06 0.80 21.76
20.003.0066
299.30 269.37 11.57 4.50 269.37
299.30 29.93 1.29 0.50 29.93
20.003.0067
153.66 138.29 5.94 1.80 138.294
153.66 15.37 0.66 0.20 15.366
20.003.0069
151.05 135.95 6.05 4.50 135.945
151.05 15.11 0.67 0.50 15.105
20.003.0073
748.68 673.81 28.94 5.40 673.812
748.68 74.87 3.22 0.60 74.868
20.003.0074
301.44 271.30 11.65 1.80 271.296
301.44 30.14 1.29 0.20 30.144
20.003.0078
177.82 160.04 6.87 1.80 160.038
177.82 17.78 0.76 0.20 17.782
20.003.0081
48.48 43.63 2.13 3.60 43.632
48.48 4.85 0.24 0.40 4.848
20.003.0087
87.46 78.71 3.38 1.80 78.714
87.46 8.75 0.38 0.20 8.746
20.003.0093
59.86 53.87 2.31 0.90 53.874
59.86 5.99 0.26 0.10 5.986
30.001.0002
2,816.48 2,534.83 108.86 7.20 2534.832
2,816.48 281.65 12.10 0.80 281.648
30.001.0003
300.84 270.76 11.40 0.90 270.756
300.84 30.08 1.27 0.10 30.084
30.001.0004
534.26 480.83 20.25 0.90 480.834
534.26 53.43 2.25 0.10 53.426
30.001.0010
397.65 357.89 16.51 2.70 357.885
397.65 39.77 1.83 0.30 39.765
30.001.0011
1,793.90 1,614.51 70.33 4.50 1614.51
1,793.90 179.39 7.81 0.50 179.39
30.001.0012
223.20 200.88 10.38 0.90 200.88
223.20 22.32 1.15 0.10 22.32
30.001.0016
747.50 672.75 33.18 9.00 672.75
747.50 74.75 3.69 1.00 74.75
40.006.0013
68.08 61.27 2.58 7.20 61.272
68.08 6.81 0.29 0.80 6.808
40.006.0015
375.06 337.56 14.50 23.97 337.556736
375.06 37.51 1.61 2.66 37.506304
40.006.0016
2.07 1.86 0.08 9.78 1.858941
2.07 0.21 0.01 1.09 0.206549
40.006.0019
136.55 122.89 5.83 14.11 122.892003
136.55 13.65 0.65 1.57 13.654667
40.006.0020
46.49 41.84 1.80 2.77 41.843061
46.49 4.65 0.20 0.31 4.649229
40.006.0024
237.70 213.93 10.29 34.56 213.9264
237.70 23.77 1.14 3.84 23.7696

20.001.0009
3.00 0.30 4.32 0.30 66.213
3.00 0.60 8.64 0.60 132.426
3.00 1.20 17.28 1.20 264.852
3.00 0.60 8.64 0.60 132.426
3.00 0.30 4.32 0.30 66.213
20.001.0022
1.00 0.10 4.20 0.10 50.764
1.00 0.20 8.40 0.20 101.528
1.00 0.40 16.80 0.40 203.056
1.00 0.20 8.40 0.20 101.528
1.00 0.10 4.20 0.10 50.764
20.001.0025
1.00 0.10 2.70 0.10 35.171
1.00 0.20 5.40 0.20 70.342
1.00 0.40 10.80 0.40 140.684
1.00 0.20 5.40 0.20 70.342
1.00 0.10 2.70 0.10 35.171
20.001.00X4
2.00 0.20 6.36 0.20 100
2.00 0.40 12.72 0.40 200
2.00 0.80 25.44 0.80 400
2.00 0.40 12.72 0.40 200
2.00 0.20 6.36 0.20 100
40.002.0005
1.00 0.10 6.00 0.10 75.678
1.00 0.20 12.00 0.20 151.356
1.00 0.40 24.00 0.40 302.712
1.00 0.20 12.00 0.20 151.356
1.00 0.10 6.00 0.10 75.678

25.002.0007
247,691.11 247,691.11 7,625.61 28,243.00 247691.11 0.01
30.001.0009
57,262.55 57,262.55 3,690.94 883.00 57262.55 0.15
30.001.0010
278,056.68 278,056.68 15,975.52 6,886.00 278056.68 0.08
30.001.0011
392,067.26 392,067.26 19,614.14 21,554.00 392067.26 0.03

30.001.0005
7,536.20 6,782.58 475.05 4.50 6782.58
7,536.20 753.62 52.78 0.50 753.62
30.001.0009
4,019.40 3,617.46 202.84 16.20 3617.46
4,019.40 401.94 22.54 1.80 401.94
30.001.0011
15,136.10 13,622.49 918.94 44.10 13622.49
15,136.10 1,513.61 102.10 4.90 1513.61
40.001.0003
0.00 0.00 0.00 2.10 0
0.00 0.00 0.00 0.90 0
40.001.0013
0.00 0.00 0.00 24.50 0
0.00 0.00 0.00 10.50 0
40.001.0014
0.00 0.00 0.00 1.40 0
0.00 0.00 0.00 0.60 0
40.001.0021
0.00 0.00 0.00 2.10 0
0.00 0.00 0.00 0.90 0
40.001.0022
0.00 0.00 0.00 1.40 0
0.00 0.00 0.00 0.60 0
40.007.0008
2,946.37 2,062.46 74.79 18.92 2062.462164
2,946.37 883.91 32.05 8.11 883.912356
40.007.0009
59,837.72 41,886.40 2,559.57 451.36 41886.40288
59,837.72 17,951.32 1,096.96 193.44 17951.31552
40.007.0012
31.24 21.87 0.90 0.38 21.870408
31.24 9.37 0.38 0.16 9.373032
40.007.0013
37.56 26.29 1.63 0.43 26.290866
37.56 11.27 0.70 0.18 11.267514
40.007.0021
6,962.67 4,873.87 341.37 15.47 4873.869392
6,962.67 2,088.80 146.30 6.63 2088.801168
40.007.0025
6,711.14 4,697.80 171.25 497.12 4697.80101
6,711.14 2,013.34 73.39 213.05 2013.34329
40.007.0026
7,596.41 5,317.49 193.84 401.93 5317.490241
7,596.41 2,278.92 83.08 172.25 2278.924389
40.007.0027
211,954.44 148,368.11 9,219.61 953.40 148368.108
211,954.44 63,586.33 3,951.26 408.60 63586.332
60.101.0005
132.16 118.94 4.13 0.90 118.944
132.16 13.22 0.46 0.10 13.216
60.101.0006
788.34 709.51 35.85 6.30 709.506
788.34 78.83 3.98 0.70 78.834
60.101.0007
1,077.60 969.84 52.25 7.20 969.84
1,077.60 107.76 5.81 0.80 107.76
60.101.0009
266.14 239.53 13.17 6.30 239.526
266.14 26.61 1.46 0.70 26.614
60.101.0016
474.48 427.03 23.07 7.20 427.032
474.48 47.45 2.56 0.80 47.448
60.101.0018
820.89 738.80 43.92 8.10 738.801
820.89 82.09 4.88 0.90 82.089
60.101.0019
509.19 458.27 25.51 2.70 458.271
509.19 50.92 2.83 0.30 50.919
60.101.0020
292.80 263.52 14.85 1.80 263.52
292.80 29.28 1.65 0.20 29.28
20.001.0008
534.00 480.60 25.95 5.40 480.6
534.00 53.40 2.88 0.60 53.4
20.001.0009
15,794.00 14,214.60 606.18 90.00 14214.6
15,794.00 1,579.40 67.35 10.00 1579.4
20.001.0011
350,333.64 315,300.28 13,275.94 1,225.80 315300.276
350,333.64 35,033.36 1,475.10 136.20 35033.364
20.001.0013
51.19 46.07 2.72 0.90 46.071
51.19 5.12 0.30 0.10 5.119
20.001.0014
110.06 99.05 4.17 0.90 99.054
110.06 11.01 0.46 0.10 11.006
20.001.0022
18,215.72 16,394.15 704.09 19.89 16394.149296
18,215.72 1,821.57 78.23 2.21 1821.572144
20.003.0001
92.28 83.05 4.13 0.90 83.052
92.28 9.23 0.46 0.10 9.228
20.003.0006
57.58 51.82 2.18 0.90 51.822
57.58 5.76 0.24 0.10 5.758
20.003.0007
34.75 31.28 1.32 0.90 31.275
34.75 3.48 0.15 0.10 3.475
20.003.0015
378.09 340.28 14.33 8.10 340.281
378.09 37.81 1.59 0.90 37.809
20.003.0017
8.69 7.82 0.45 0.90 7.821
8.69 0.87 0.05 0.10 0.869
20.003.0022
139.56 125.60 6.13 5.40 125.604
139.56 13.96 0.68 0.60 13.956
20.003.0023
578.90 521.01 22.29 12.60 521.01
578.90 57.89 2.48 1.40 57.89
20.003.0025
6.22 5.60 0.24 0.90 5.598
6.22 0.62 0.03 0.10 0.622
20.003.0027
8.89 8.00 0.45 0.90 8.001
8.89 0.89 0.05 0.10 0.889
20.003.0028
17.58 15.82 0.79 0.90 15.822
17.58 1.76 0.09 0.10 1.758
20.003.0032
138.78 124.90 6.13 5.40 124.902
138.78 13.88 0.68 0.60 13.878
20.003.0033
146.32 131.69 6.37 3.60 131.688
146.32 14.63 0.71 0.40 14.632
20.003.0036
445.60 401.04 18.87 1.80 401.04
445.60 44.56 2.10 0.20 44.56
20.003.0039
248.97 224.07 9.43 0.90 224.073
248.97 24.90 1.05 0.10 24.897
20.003.0040
42.01 37.81 1.59 0.90 37.809
42.01 4.20 0.18 0.10 4.201
20.003.0041
25.93 23.34 0.98 0.90 23.337
25.93 2.59 0.11 0.10 2.593
20.003.0049
38.48 34.63 1.59 0.90 34.632
38.48 3.85 0.18 0.10 3.848
20.003.0051
22.33 20.10 1.02 0.90 20.097
22.33 2.23 0.11 0.10 2.233
20.003.0052
42.01 37.81 1.59 0.90 37.809
42.01 4.20 0.18 0.10 4.201
20.003.0070
921.03 828.93 35.60 2.70 828.927
921.03 92.10 3.96 0.30 92.103
20.003.0079
507.08 456.37 19.60 1.80 456.372
507.08 50.71 2.18 0.20 50.708
30.001.0005
3,687.08 3,318.37 142.51 1.80 3318.372
3,687.08 368.71 15.83 0.20 368.708
30.001.0009
527.46 474.71 25.35 2.70 474.714
527.46 52.75 2.82 0.30 52.746
30.001.0011
8,969.50 8,072.55 351.63 22.50 8072.55
8,969.50 896.95 39.07 2.50 896.95
30.005.0002
34,683.90 31,215.51 1,137.63 102.60 31215.5098437
34,683.90 3,468.39 126.40 11.40 3468.38998264
30.005.0003
14,956.39 13,460.76 490.57 37.80 13460.7551419
14,956.39 1,495.64 54.51 4.20 1495.63946022
30.005.0004
96.81 87.12 3.18 1.80 87.1246287505
96.81 9.68 0.35 0.20 9.68051430561
30.005.0005
4,148.79 3,733.91 136.08 45.00 3733.91266073
4,148.79 414.88 15.12 5.00 414.879184526
30.005.0006
214.35 192.92 7.03 1.80 192.918820805
214.35 21.44 0.78 0.20 21.4354245338
30.005.0007
829.76 746.78 27.22 4.50 746.782532147
829.76 82.98 3.02 0.50 82.9758369052
30.005.0008
9,265.64 8,339.07 303.91 36.00 8339.07160897
9,265.64 926.56 33.77 4.00 926.563512108
30.005.0009
940.39 846.35 30.84 1.80 846.353536433
940.39 94.04 3.43 0.20 94.0392818259
30.005.0010
608.49 547.64 19.96 1.80 547.640523574
608.49 60.85 2.22 0.20 60.8489470638
30.005.0011
58,757.26 52,881.54 1,927.23 148.50 52881.5380577
58,757.26 5,875.73 214.14 16.50 5875.72645085
30.005.0012
857.42 771.68 28.12 7.20 771.675283219
857.42 85.74 3.12 0.80 85.7416981354
30.005.0013
4,148.79 3,733.91 136.08 22.50 3733.91266073
4,148.79 414.88 15.12 2.50 414.879184526
30.005.0014
926.56 833.91 30.39 3.60 833.907160897
926.56 92.66 3.38 0.40 92.6563512108
30.005.0015
45,636.71 41,073.04 1,496.88 135.00 41073.0392681
45,636.71 4,563.67 166.32 15.00 4563.67102979
30.005.0016
14,244.19 12,819.77 467.21 36.00 12819.7668019
14,244.19 1,424.42 51.91 4.00 1424.41853354
30.005.0018
30,009.59 27,008.63 984.31 63.00 27008.6349126
30,009.59 3,000.96 109.37 7.00 3000.95943474
30.005.0019
580.83 522.75 19.05 10.80 522.747772503
580.83 58.08 2.12 1.20 58.0830858337
30.005.0020
5,393.43 4,854.09 176.90 58.50 4854.08645896
5,393.43 539.34 19.66 6.50 539.342939884
30.005.0021
535.89 482.30 17.58 4.50 482.297052012
535.89 53.59 1.95 0.50 53.5885613346
30.005.0022
13,276.13 11,948.52 435.46 72.00 11948.5205144
13,276.13 1,327.61 48.38 8.00 1327.61339048
30.005.0023
2,779.69 2,501.72 91.17 10.80 2501.72148269
2,779.69 277.97 10.13 1.20 277.969053632
30.005.0053
26,407.06 23,766.35 866.15 102.60 23766.3540856
26,407.06 2,640.71 96.24 11.40 2640.70600951
40.004.0002
0.00 0.00 0.00 16.10 0
0.00 0.00 0.00 6.90 0
40.004.0003
0.00 0.00 0.00 7.00 0
0.00 0.00 0.00 3.00 0
40.004.0004
0.00 0.00 0.00 1.40 0
0.00 0.00 0.00 0.60 0
40.004.0005
0.00 0.00 0.00 7.00 0
0.00 0.00 0.00 3.00 0
40.004.0006
0.00 0.00 0.00 1.40 0
0.00 0.00 0.00 0.60 0
40.004.0007
0.00 0.00 0.00 3.50 0
0.00 0.00 0.00 1.50 0
40.004.0008
0.00 0.00 0.00 5.60 0
0.00 0.00 0.00 2.40 0
40.004.0009
0.00 0.00 0.00 1.40 0
0.00 0.00 0.00 0.60 0
40.004.0010
0.00 0.00 0.00 1.40 0
0.00 0.00 0.00 0.60 0
40.004.0011
0.00 0.00 0.00 23.10 0
0.00 0.00 0.00 9.90 0
40.004.0012
0.00 0.00 0.00 1.40 0
0.00 0.00 0.00 0.60 0
40.004.0013
0.00 0.00 0.00 3.50 0
0.00 0.00 0.00 1.50 0
40.004.0014
0.00 0.00 0.00 2.80 0
0.00 0.00 0.00 1.20 0
40.004.0015
0.00 0.00 0.00 21.00 0
0.00 0.00 0.00 9.00 0
40.004.0016
0.00 0.00 0.00 5.60 0
0.00 0.00 0.00 2.40 0
40.004.0018
0.00 0.00 0.00 9.80 0
0.00 0.00 0.00 4.20 0
40.004.0019
0.00 0.00 0.00 2.10 0
0.00 0.00 0.00 0.90 0
40.004.0020
0.00 0.00 0.00 9.10 0
0.00 0.00 0.00 3.90 0
40.004.0021
0.00 0.00 0.00 3.50 0
0.00 0.00 0.00 1.50 0
40.004.0022
0.00 0.00 0.00 11.20 0
0.00 0.00 0.00 4.80 0
40.004.0023
0.00 0.00 0.00 2.10 0
0.00 0.00 0.00 0.90 0
40.004.0024
0.00 0.00 0.00 16.10 0
0.00 0.00 0.00 6.90 0
40.006.0008
41.22 28.85 1.50 4.20 28.854
41.22 12.37 0.64 1.80 12.366
40.006.0009
1,177.00 823.90 35.11 70.00 823.9
1,177.00 353.10 15.05 30.00 353.1
40.006.0012
3.86 2.70 0.15 0.70 2.702
3.86 1.16 0.06 0.30 1.158
40.006.0013
8.51 5.96 0.25 0.70 5.957
8.51 2.55 0.11 0.30 2.553
40.006.0021
1,430.94 1,001.66 43.02 15.47 1001.655872
1,430.94 429.28 18.44 6.63 429.281088
80.003.0001
2,477.04 2,229.34 0.00 23.40 2229.3372964
2,477.04 247.70 0.00 2.60 247.704144045
80.003.0002
0.00 0.00 93.87 23.40 0
0.00 0.00 10.43 2.60 0
80.006.0001
4,623.81 4,161.43 0.00 23.40 4161.42961995
4,623.81 462.38 0.00 2.60 462.381068884
80.006.0002
0.00 0.00 175.22 23.40 0
0.00 0.00 19.47 2.60 0
80.006.0003
4,623.81 4,161.43 0.00 23.40 4161.42961995
4,623.81 462.38 0.00 2.60 462.381068884
80.006.0004
0.00 0.00 175.22 23.40 0
0.00 0.00 19.47 2.60 0
90.001.0001
34,064.27 23,844.99 869.02 497.12 23844.991682
34,064.27 6,812.85 248.29 142.03 6812.85476629
34,064.27 3,406.43 124.15 71.02 3406.42738315
90.001.0002
39,232.65 27,462.86 1,000.87 401.93 27462.8574356
39,232.65 7,846.53 285.96 114.84 7846.53069589
39,232.65 3,923.27 142.98 57.42 3923.26534794
90.001.0004
158,003.08 110,602.16 4,030.82 955.64 110602.158538
158,003.08 31,600.62 1,151.66 273.04 31600.6167252
158,003.08 15,800.31 575.83 136.52 15800.3083626
90.001.0005
65,441.91 45,809.34 1,669.49 346.22 45809.3371827
65,441.91 13,088.38 477.00 98.92 13088.3820522
65,441.91 6,544.19 238.50 49.46 6544.19102609
90.001.0006
36.15 25.31 0.92 1.12 25.3074973169
36.15 7.23 0.26 0.32 7.23071351911
36.15 3.62 0.13 0.16 3.61535675956
90.001.0007
21,822.78 15,275.94 556.72 407.39 15275.9448311
21,822.78 4,364.56 159.06 116.40 4364.55566604
21,822.78 2,182.28 79.53 58.20 2182.27783302
90.001.0008
624.90 437.43 15.94 9.12 437.43160357
624.90 124.98 4.55 2.61 124.980458163
624.90 62.49 2.28 1.30 62.4902290814
90.001.0009
3,240.46 2,268.32 82.67 33.20 2268.31959588
3,240.46 648.09 23.62 9.49 648.09131311
3,240.46 324.05 11.81 4.74 324.045656555
90.001.0010
42,228.39 29,559.87 1,077.29 324.03 29559.8702781
42,228.39 8,445.68 307.80 92.58 8445.67722232
42,228.39 4,222.84 153.90 46.29 4222.83861116
90.001.0011
1,096.09 767.26 27.96 4.51 767.263368951
1,096.09 219.22 7.99 1.29 219.218105415
1,096.09 109.61 3.99 0.64 109.609052707
90.001.0012
481.92 337.35 12.29 2.91 337.347431481
481.92 96.38 3.51 0.83 96.3849804233
481.92 48.19 1.76 0.42 48.1924902116
90.001.0013
256,218.30 179,352.81 6,536.40 1,355.52 179352.809112
256,218.30 51,243.66 1,867.54 387.29 51243.6597463
256,218.30 25,621.83 933.77 193.65 25621.8298732
90.001.0014
3,138.18 2,196.73 80.06 45.80 2196.72725388
3,138.18 627.64 22.87 13.09 627.636358251
3,138.18 313.82 11.44 6.54 313.818179126
90.001.0015
19,000.25 13,300.17 484.72 194.65 13300.1729743
19,000.25 3,800.05 138.49 55.61 3800.04942123
19,000.25 1,900.02 69.25 27.81 1900.02471061
90.001.0016
3,566.18 2,496.33 90.98 27.36 2496.3263259
3,566.18 713.24 25.99 7.82 713.236093114
3,566.18 356.62 13.00 3.91 356.618046557
90.001.0017
200,666.40 140,466.48 5,119.21 1,213.68 140466.47993
200,666.40 40,133.28 1,462.63 346.77 40133.2799801
200,666.40 20,066.64 731.32 173.38 20066.6399901
90.001.0018
57,597.07 40,317.95 1,469.36 304.72 40317.9479935
57,597.07 11,519.41 419.82 87.06 11519.4137124
57,597.07 5,759.71 209.91 43.53 5759.70685622
90.001.0020
128,450.87 89,915.61 3,276.92 577.17 89915.6106
128,450.87 25,690.17 936.26 164.91 25690.1744572
128,450.87 12,845.09 468.13 82.45 12845.0872286
90.001.0021
3,073.64 2,151.55 78.41 94.92 2151.54980794
3,073.64 614.73 22.40 27.12 614.728516555
3,073.64 307.36 11.20 13.56 307.364258277
90.001.0022
28,664.86 20,065.40 731.27 535.12 20065.401732
28,664.86 5,732.97 208.93 152.89 5732.97192342
28,664.86 2,866.49 104.47 76.45 2866.48596171
90.001.0023
1,848.33 1,293.83 47.15 26.97 1293.82786398
1,848.33 369.67 13.47 7.71 369.665103995
1,848.33 184.83 6.74 3.85 184.832551997
90.001.0024
64,899.19 45,429.43 1,655.65 664.87 45429.4313531
64,899.19 12,979.84 473.04 189.96 12979.8375295
64,899.19 6,489.92 236.52 94.98 6489.91876473
90.001.0025
12,364.59 8,655.21 315.43 94.88 8655.21267488
12,364.59 2,472.92 90.12 27.11 2472.91790711
12,364.59 1,236.46 45.06 13.55 1236.45895355
90.002.0001
9,127.34 8,214.61 299.38 19.80 8214.60785362
9,127.34 912.73 33.26 2.20 912.734205957
90.002.0002
1,382.93 1,244.64 45.36 4.50 1244.63755358
1,382.93 138.29 5.04 0.50 138.293061509
90.002.0003
2,644.85 2,380.37 86.75 2.70 2380.36932122
2,644.85 264.49 9.64 0.30 264.485480135
90.002.0004
1,521.22 1,369.10 49.90 1.80 1369.10130894
1,521.22 152.12 5.54 0.20 152.12236766
90.002.0005
1,106.34 995.71 36.29 3.60 995.710042863
1,106.34 110.63 4.03 0.40 110.634449207
90.002.0006
829.76 746.78 27.22 1.80 746.782532147
829.76 82.98 3.02 0.20 82.9758369052
90.002.0007
207.44 186.70 6.80 0.90 186.695633037
207.44 20.74 0.76 0.10 20.7439592263
90.002.0008
2,220.99 1,998.89 72.85 3.60 1998.88791105
2,220.99 222.10 8.09 0.40 222.098656783
90.002.0009
3,270.63 2,943.57 107.28 4.50 2943.56781421
3,270.63 327.06 11.92 0.50 327.063090468
90.002.0010
555.25 499.72 18.21 0.90 499.721977762
555.25 55.52 2.02 0.10 55.5246641957
90.002.0011
1,110.49 999.44 36.42 1.80 999.443955523
1,110.49 111.05 4.05 0.20 111.049328391
90.002.0012
3,924.76 3,532.28 128.73 5.40 3532.28137706
3,924.76 392.48 14.30 0.60 392.475708562
90.002.0013
555.25 499.72 18.21 0.90 499.721977762
555.25 55.52 2.02 0.10 55.5246641957
90.002.0014
2,776.23 2,498.61 91.06 4.50 2498.60988881
2,776.23 277.62 10.12 0.50 277.623320979
90.002.0015
3,135.10 2,821.59 102.83 3.60 2821.59333396
3,135.10 313.51 11.43 0.40 313.51037044
90.002.0016
555.25 499.72 18.21 0.90 499.721977762
555.25 55.52 2.02 0.10 55.5246641957
90.002.0017
2,616.50 2,354.85 85.82 3.60 2354.85425137
2,616.50 261.65 9.54 0.40 261.650472374
90.002.0018
3,924.76 3,532.28 128.73 5.40 3532.28137706
3,924.76 392.48 14.30 0.60 392.475708562
90.002.0019
760.61 684.55 24.95 4.50 684.550654468
760.61 76.06 2.77 0.50 76.0611838298
90.002.0020
304.59 274.13 9.99 0.90 274.131421176
304.59 30.46 1.11 0.10 30.4590467973
90.002.0021
791.04 711.93 25.95 3.60 711.932680647
791.04 79.10 2.88 0.40 79.103631183
90.002.0022
90.93 81.83 2.98 0.90 81.8349191478
90.93 9.09 0.33 0.10 9.0927687942
90.002.0023
608.49 547.64 19.96 3.60 547.640523574
608.49 60.85 2.22 0.40 60.8489470638
90.002.0024
304.59 274.13 9.99 0.90 274.131421176
304.59 30.46 1.11 0.10 30.4590467973
90.002.0025
197.76 177.98 6.49 0.90 177.983170162
197.76 19.78 0.72 0.10 19.7759077957
90.002.0026
555.25 499.72 18.21 0.90 499.721977762
555.25 55.52 2.02 0.10 55.5246641957
90.002.0027
8,883.95 7,995.55 291.39 14.40 7995.55164419
8,883.95 888.39 32.38 1.60 888.394627132
90.002.0028
3,270.63 2,943.57 107.28 4.50 2943.56781421
3,270.63 327.06 11.92 0.50 327.063090468
90.002.0029
783.78 705.40 25.71 0.90 705.39833349
783.78 78.38 2.86 0.10 78.3775926101
90.002.0030
3,924.76 3,532.28 128.73 5.40 3532.28137706
3,924.76 392.48 14.30 0.60 392.475708562
90.002.0031
2,600.26 2,340.23 85.29 2.70 2340.22976012
2,600.26 260.03 9.48 0.30 260.025528902
90.002.0032
1,110.49 999.44 36.42 1.80 999.443955523
1,110.49 111.05 4.05 0.20 111.049328391
90.002.0033
654.13 588.71 21.46 0.90 588.713562843
654.13 65.41 2.38 0.10 65.4126180936
90.002.0034
90.93 81.83 2.98 0.90 81.8349191478
90.93 9.09 0.33 0.10 9.0927687942
90.002.0035
1,064.86 958.37 34.93 6.30 958.370916255
1,064.86 106.49 3.88 0.70 106.485657362
90.002.0036
593.28 533.95 19.46 2.70 533.949510485
593.28 59.33 2.16 0.30 59.3277233872
90.002.0037
1,522.95 1,370.66 49.95 4.50 1370.65710588
1,522.95 152.30 5.55 0.50 152.295233986
90.002.0038
425.60 383.04 13.96 0.90 383.037207114
425.60 42.56 1.55 0.10 42.5596896793
90.002.0039
791.04 711.93 25.95 3.60 711.932680647
791.04 79.10 2.88 0.40 79.103631183
90.002.0040
6,091.81 5,482.63 199.81 18.00 5482.62842351
6,091.81 609.18 22.20 2.00 609.180935946
90.002.0041
912.73 821.46 29.94 5.40 821.460785362
912.73 91.27 3.33 0.60 91.2734205957
90.002.0042
3,350.50 3,015.45 109.90 9.90 3015.44563293
3,350.50 335.05 12.21 1.10 335.04951477
90.002.0043
1,702.39 1,532.15 55.84 3.60 1532.14882845
1,702.39 170.24 6.20 0.40 170.238758717
90.002.0044
2,963.42 2,667.08 97.20 25.20 2667.08047195
2,963.42 296.34 10.80 2.80 296.342274661
90.002.0045
49.44 44.50 1.62 0.90 44.4957925404
49.44 4.94 0.18 0.10 4.94397694894
90.002.0046
248.93 224.03 8.16 2.70 224.034759644
248.93 24.89 0.91 0.30 24.8927510716
90.002.0047
323.61 291.25 10.61 2.70 291.245187537
323.61 32.36 1.18 0.30 32.360576393
90.002.0048
2,993.35 2,694.02 98.18 16.20 2694.01798472
2,993.35 299.34 10.91 1.80 299.335331636
90.002.0049
927.95 835.15 30.44 3.60 835.151798451
927.95 92.79 3.38 0.40 92.7946442723
90.002.0050
302.86 272.58 9.93 0.90 272.575624234
302.86 30.29 1.10 0.10 30.2861804704
90.002.0051
713.59 642.23 23.41 1.80 642.232977646
713.59 71.36 2.60 0.20 71.3592197385
90.002.0052
539.34 485.41 17.69 4.50 485.408645896
539.34 53.93 1.97 0.50 53.9342939884
90.002.0053
11,308.22 10,177.40 370.91 61.20 10177.4012756
11,308.22 1,130.82 41.21 6.80 1130.82236396
90.002.0054
605.72 545.15 19.87 1.80 545.151248467
605.72 60.57 2.21 0.20 60.5723609408
90.002.0055
4,995.15 4,495.63 163.84 12.60 4495.63084352
4,995.15 499.51 18.20 1.40 499.514538169
90.002.0056
472.62 425.35 15.50 0.90 425.354883935
472.62 47.26 1.72 0.10 47.2616537706
90.002.0057
98.88 88.99 3.24 1.80 88.9915850808
98.88 9.89 0.36 0.20 9.88795389787
90.002.0058
414.88 373.39 13.61 4.50 373.391266073
414.88 41.49 1.51 0.50 41.4879184526
90.002.0059
323.61 291.25 10.61 2.70 291.245187537
323.61 32.36 1.18 0.30 32.360576393
90.002.0060
1,164.08 1,047.67 38.18 6.30 1047.67366072
1,164.08 116.41 4.24 0.70 116.408184525
90.002.0061
463.97 417.58 15.22 1.80 417.575899226
463.97 46.40 1.69 0.20 46.3973221362
90.002.0062
908.59 817.73 29.80 2.70 817.726872701
908.59 90.86 3.31 0.30 90.8585414112
90.002.0063
713.59 642.23 23.41 1.80 642.232977646
713.59 71.36 2.60 0.20 71.3592197385
90.002.0064
64.31 57.88 2.11 1.80 57.8756462414
64.31 6.43 0.23 0.20 6.43062736015
90.002.0065
414.88 373.39 13.61 4.50 373.391266073
414.88 41.49 1.51 0.50 41.4879184526
90.002.0066
323.61 291.25 10.61 2.70 291.245187537
323.61 32.36 1.18 0.30 32.360576393
90.002.0067
1,164.08 1,047.67 38.18 6.30 1047.67366072
1,164.08 116.41 4.24 0.70 116.408184525
90.002.0068
463.97 417.58 15.22 1.80 417.575899226
463.97 46.40 1.69 0.20 46.3973221362
90.002.0069
908.59 817.73 29.80 2.70 817.726872701
908.59 90.86 3.31 0.30 90.8585414112
90.002.0070
713.59 642.23 23.41 1.80 642.232977646
713.59 71.36 2.60 0.20 71.3592197385
90.002.0071
49.44 44.50 1.62 0.90 44.4957925404
49.44 4.94 0.18 0.10 4.94397694894
90.002.0072
248.93 224.03 8.16 2.70 224.034759644
248.93 24.89 0.91 0.30 24.8927510716
90.002.0073
862.95 776.65 28.30 7.20 776.653833433
862.95 86.29 3.14 0.80 86.2948703814
90.002.0074
14,301.58 12,871.42 469.09 77.40 12871.4192603
14,301.58 1,430.16 52.12 8.60 1430.15769559
90.002.0075
927.95 835.15 30.44 3.60 835.151798451
927.95 92.79 3.38 0.40 92.7946442723
90.002.0076
908.59 817.73 29.80 2.70 817.726872701
908.59 90.86 3.31 0.30 90.8585414112
90.002.0077
6,422.33 5,780.10 210.65 16.20 5780.09679882
6,422.33 642.23 23.41 1.80 642.232977646
90.002.0078
472.62 425.35 15.50 0.90 425.354883935
472.62 47.26 1.72 0.10 47.2616537706
90.002.0079
48.40 43.56 1.59 0.90 43.5623143752
48.40 4.84 0.18 0.10 4.8402571528
90.002.0080
266.91 240.22 8.75 1.80 240.215047841
266.91 26.69 0.97 0.20 26.6905608712
90.002.0081
206.06 185.45 6.76 0.90 185.450995483
206.06 20.61 0.75 0.10 20.6056661648
90.002.0082
3,422.75 3,080.48 112.27 5.40 3080.47794511
3,422.75 342.28 12.47 0.60 342.275327234
90.002.0083
1,140.92 1,026.83 37.42 1.80 1026.8259817
1,140.92 114.09 4.16 0.20 114.091775745
90.002.0084
570.46 513.41 18.71 0.90 513.412990851
570.46 57.05 2.08 0.10 57.0458878723
90.002.0085
276.59 248.93 9.07 0.90 248.927510716
276.59 27.66 1.01 0.10 27.6586123017
90.002.0086
2,489.28 2,240.35 81.65 5.40 2240.34759644
2,489.28 248.93 9.07 0.60 248.927510716
90.002.0087
121.01 108.91 3.97 0.90 108.905785938
121.01 12.10 0.44 0.10 12.100642882
90.002.0088
276.59 248.93 9.07 0.90 248.927510716
276.59 27.66 1.01 0.10 27.6586123017
90.002.0089
425.60 383.04 13.96 0.90 383.037207114
425.60 42.56 1.55 0.10 42.5596896793
90.002.0090
555.25 499.72 18.21 0.90 499.721977762
555.25 55.52 2.02 0.10 55.5246641957
90.002.0091
304.59 274.13 9.99 0.90 274.131421176
304.59 30.46 1.11 0.10 30.4590467973
90.002.0092
425.60 383.04 13.96 0.90 383.037207114
425.60 42.56 1.55 0.10 42.5596896793
90.002.0093
555.25 499.72 18.21 0.90 499.721977762
555.25 55.52 2.02 0.10 55.5246641957
90.002.0094
1,308.25 1,177.43 42.91 1.80 1177.42712569
1,308.25 130.83 4.77 0.20 130.825236187
90.002.0095
1,886.32 1,697.69 61.87 1.80 1697.68562308
1,886.32 188.63 6.87 0.20 188.631735898
90.002.0096
1,615.26 1,453.74 52.98 1.80 1453.73666258
1,615.26 161.53 5.89 0.20 161.526295842
90.002.0097
2,854.37 2,568.93 93.62 2.70 2568.93191059
2,854.37 285.44 10.40 0.30 285.436878954
90.002.0098
2,854.37 2,568.93 93.62 2.70 2568.93191059
2,854.37 285.44 10.40 0.30 285.436878954
90.002.0099
619.21 557.29 20.31 0.90 557.286464615
619.21 61.92 2.26 0.10 61.9207182905
90.002.0100
442.88 398.60 14.53 0.90 398.595176533
442.88 44.29 1.61 0.10 44.2883529482
90.002.0101
442.88 398.60 14.53 0.90 398.595176533
442.88 44.29 1.61 0.10 44.2883529482
90.002.0102
619.21 557.29 20.31 0.90 557.286464615
619.21 61.92 2.26 0.10 61.9207182905
90.002.0103
807.63 726.87 26.49 0.90 726.86833129
807.63 80.76 2.94 0.10 80.7631479211
90.002.0104
619.21 557.29 20.31 0.90 557.286464615
619.21 61.92 2.26 0.10 61.9207182905
90.002.0105
4,757.28 4,281.55 156.04 4.50 4281.55318431
4,757.28 475.73 17.34 0.50 475.72813159
90.002.0106
17,126.21 15,413.59 561.74 16.20 15413.5914635
17,126.21 1,712.62 62.42 1.80 1712.62127372
90.002.0107
951.46 856.31 31.21 0.90 856.310636862
951.46 95.15 3.47 0.10 95.145626318
90.002.0108
221.27 199.14 7.26 0.90 199.142008573
221.27 22.13 0.81 0.10 22.1268898414
90.002.0109
619.21 557.29 20.31 0.90 557.286464615
619.21 61.92 2.26 0.10 61.9207182905
90.002.0110
619.21 557.29 20.31 0.90 557.286464615
619.21 61.92 2.26 0.10 61.9207182905
90.002.0111
1,857.62 1,671.86 60.93 2.70 1671.85939384
1,857.62 185.76 6.77 0.30 185.762154872
90.002.0112
1,902.91 1,712.62 62.42 1.80 1712.62127372
1,902.91 190.29 6.94 0.20 190.291252636

20.001.0003
0.00 0.00 0.00 100.50 0
0.00 0.00 0.00 20.10 0
0.00 0.00 0.00 80.40 0
20.001.0004
63.19 31.60 31.60 100.50 366.825002611
63.19 6.32 6.32 20.10 73.3650005221
63.19 25.28 25.28 80.40 293.460002089
20.001.0103
0.00 0.00 0.00 100.50 0
0.00 0.00 0.00 20.10 0
0.00 0.00 0.00 80.40 0
20.001.0104
66.07 33.03 33.03 100.50 383.910002732
66.07 6.61 6.61 20.10 76.7820005465
66.07 26.43 26.43 80.40 307.128002186
20.001.0008
19.64 9.82 9.82 33.50 113.565000808
19.64 1.96 1.96 6.70 22.7130001616
19.64 7.86 7.86 26.80 90.8520006466
20.001.0108
20.54 10.27 10.27 33.50 118.925000846
20.54 2.05 2.05 6.70 23.7850001693
20.54 8.22 8.22 26.80 95.1400006771
20.002.0001
0.00 0.00 0.00 100.00 0
0.00 0.00 0.00 20.00 0
0.00 0.00 0.00 80.00 0
20.002.0002
62.88 31.44 31.44 100.00 365
62.88 6.29 6.29 20.00 73
62.88 25.15 25.15 80.00 292
40.001.0012
370.10 111.03 111.03 1,566.00 2897.1
370.10 55.51 55.51 783.00 1448.55
370.10 55.51 55.51 783.00 1448.55
370.10 148.04 148.04 2,088.00 3862.8
40.001.0026
10.64 3.19 3.19 45.00 83.25
10.64 1.60 1.60 22.50 41.625
10.64 1.60 1.60 22.50 41.625
10.64 4.25 4.25 60.00 111
40.001.0040
88.63 26.59 26.59 375.00 693.75
88.63 13.29 13.29 187.50 346.875
88.63 13.29 13.29 187.50 346.875
88.63 35.45 35.45 500.00 925
40.002.2812
593.53 59.35 59.35 4.35 1453.82392
593.53 118.71 118.71 8.69 2907.64784
593.53 267.09 267.09 19.56 6542.20764
593.53 59.35 59.35 4.35 1453.82392
593.53 29.68 29.68 2.17 726.91196
593.53 59.35 59.35 4.35 1453.82392
40.002.2826
37.75 3.77 3.77 0.14 69.73904
37.75 7.55 7.55 0.28 139.47808
37.75 3.77 3.77 0.14 69.73904
37.75 13.21 13.21 0.50 244.08664
37.75 3.77 3.77 0.14 69.73904
37.75 1.89 1.89 0.07 34.86952
37.75 3.77 3.77 0.14 69.73904
40.002.2840
51.16 5.12 5.12 1.23 273.28164
51.16 10.23 10.23 2.47 546.56328
51.16 23.02 23.02 5.55 1229.76738
51.16 5.12 5.12 1.23 273.28164
51.16 2.56 2.56 0.62 136.64082
51.16 5.12 5.12 1.23 273.28164
40.002.1564
314.66 31.47 31.47 1.73 609.60384
314.66 62.93 62.93 3.46 1219.20768
314.66 47.20 47.20 2.59 914.40576
314.66 94.40 94.40 5.18 1828.81152
314.66 31.47 31.47 1.73 609.60384
314.66 15.73 15.73 0.86 304.80192
314.66 31.47 31.47 1.73 609.60384
60.002.1061
22.62 5.66 5.66 1.26 255.353241561
22.62 6.79 6.79 1.51 306.423889873
22.62 5.66 5.66 1.26 255.353241561
22.62 2.26 2.26 0.50 102.141296624
22.62 2.26 2.26 0.50 102.141296624

20.001.0006
495.00 49.50 49.50 12.50 831.25
495.00 346.50 346.50 87.50 5,818.75
495.00 99.00 99.00 25.00 1,662.50
20.002.0002
558.00 55.80 55.80 30.00 788.40
558.00 390.60 390.60 210.00 5,518.80
558.00 111.60 111.60 60.00 1,576.80
20.002.0032
78.00 7.80 7.80 10.00 166.30
78.00 54.60 54.60 70.00 1,164.10
78.00 15.60 15.60 20.00 332.60
30.002.6312
20.40 2.04 2.04 10.00 29.10
20.40 14.28 14.28 70.00 203.70
20.40 4.08 4.08 20.00 58.20
30.002.6314
7.80 0.78 0.78 5.00 10.80
7.80 5.46 5.46 35.00 75.60
7.80 1.56 1.56 10.00 21.60
30.002.6315
14.40 1.44 1.44 10.00 20.10
14.40 10.08 10.08 70.00 140.70
14.40 2.88 2.88 20.00 40.20
30.002.6511
22.50 2.25 2.25 7.50 30.83
22.50 15.75 15.75 52.50 215.78
22.50 4.50 4.50 15.00 61.65
30.002.7021
96.00 9.60 9.60 100.00 132.00
96.00 67.20 67.20 700.00 924.00
96.00 19.20 19.20 200.00 264.00
30.002.7022
31.20 3.12 3.12 20.00 43.00
31.20 21.84 21.84 140.00 301.00
31.20 6.24 6.24 40.00 86.00
30.002.8101
60.00 6.00 6.00 20.00 82.80
60.00 42.00 42.00 140.00 579.60
60.00 12.00 12.00 40.00 165.60
30.002.8102
48.00 4.80 4.80 20.00 66.40
48.00 33.60 33.60 140.00 464.80
48.00 9.60 9.60 40.00 132.80
30.002.9114
9.90 0.99 0.99 7.50 13.73
9.90 6.93 6.93 52.50 96.08
9.90 1.98 1.98 15.00 27.45
40.001.0001
75.60 7.56 7.56 5.00 105.75
75.60 52.92 52.92 35.00 740.25
75.60 15.12 15.12 10.00 211.50
40.001.0002
9.72 0.97 0.97 3.00 13.44
9.72 6.80 6.80 21.00 94.08
9.72 1.94 1.94 6.00 26.88
40.002.0002
67.20 6.72 6.72 20.00 94.20
67.20 47.04 47.04 140.00 659.40
67.20 13.44 13.44 40.00 188.40
40.002.0003
54.00 5.40 5.40 30.00 74.70
54.00 37.80 37.80 210.00 522.90
54.00 10.80 10.80 60.00 149.40
40.004.0001
84.00 8.40 8.40 0.10 192.14
84.00 58.80 58.80 0.70 1,345.00
84.00 16.80 16.80 0.20 384.29
50.001.6315
4.80 0.48 0.48 1.00 5.34
4.80 2.40 2.40 5.00 26.70
4.80 0.96 0.96 2.00 10.68
4.80 0.96 0.96 2.00 10.68
50.001.7021
7.20 0.72 0.72 2.00 8.02
7.20 3.60 3.60 10.00 40.10
7.20 1.44 1.44 4.00 16.04
7.20 1.44 1.44 4.00 16.04

20.001.0016
1.00 0.10 1.44 0.10 22.077
1.00 0.20 2.88 0.20 44.154
1.00 0.40 5.76 0.40 88.308
1.00 0.20 2.88 0.20 44.154
1.00 0.10 1.44 0.10 22.077

70.001.4701
3,000.00 300.00 300.00 0.10 7954.184
3,000.00 300.00 300.00 0.10 7954.184
3,000.00 1,500.00 1,500.00 0.50 39770.92
3,000.00 600.00 600.00 0.20 15908.368
3,000.00 300.00 300.00 0.10 7954.184
70.001.4702
3,000.00 300.00 300.00 0.10 7954.184
3,000.00 300.00 300.00 0.10 7954.184
3,000.00 1,500.00 1,500.00 0.50 39770.92
3,000.00 600.00 600.00 0.20 15908.368
3,000.00 300.00 300.00 0.10 7954.184

20.001.0006
495.00 49.50 49.50 12.50 831.25
495.00 346.50 346.50 87.50 5818.75
495.00 99.00 99.00 25.00 1662.5
20.002.0002
558.00 55.80 55.80 30.00 788.4
558.00 390.60 390.60 210.00 5518.8
558.00 111.60 111.60 60.00 1576.8
20.002.0032
78.00 7.80 7.80 10.00 166.3
78.00 54.60 54.60 70.00 1164.1
78.00 15.60 15.60 20.00 332.6
30.002.6312
20.40 2.04 2.04 10.00 29.1
20.40 14.28 14.28 70.00 203.7
20.40 4.08 4.08 20.00 58.2
30.002.6314
7.80 0.78 0.78 5.00 10.8
7.80 5.46 5.46 35.00 75.6
7.80 1.56 1.56 10.00 21.6
30.002.6315
14.40 1.44 1.44 10.00 20.1
14.40 10.08 10.08 70.00 140.7
14.40 2.88 2.88 20.00 40.2
30.002.6511
22.50 2.25 2.25 7.50 30.825
22.50 15.75 15.75 52.50 215.775
22.50 4.50 4.50 15.00 61.65
30.002.7021
96.00 9.60 9.60 100.00 132
96.00 67.20 67.20 700.00 924
96.00 19.20 19.20 200.00 264
30.002.7022
31.20 3.12 3.12 20.00 43
31.20 21.84 21.84 140.00 301
31.20 6.24 6.24 40.00 86
30.002.8101
60.00 6.00 6.00 20.00 82.8
60.00 42.00 42.00 140.00 579.6
60.00 12.00 12.00 40.00 165.6
30.002.8102
48.00 4.80 4.80 20.00 66.4
48.00 33.60 33.60 140.00 464.8
48.00 9.60 9.60 40.00 132.8
30.002.9114
9.90 0.99 0.99 7.50 13.725
9.90 6.93 6.93 52.50 96.075
9.90 1.98 1.98 15.00 27.45
40.001.0001
75.60 7.56 7.56 5.00 105.75
75.60 52.92 52.92 35.00 740.25
75.60 15.12 15.12 10.00 211.5
40.001.0002
9.72 0.97 0.97 3.00 13.44
9.72 6.80 6.80 21.00 94.08
9.72 1.94 1.94 6.00 26.88
40.002.0002
67.20 6.72 6.72 20.00 94.2
67.20 47.04 47.04 140.00 659.4
67.20 13.44 13.44 40.00 188.4
40.002.0003
54.00 5.40 5.40 30.00 74.7
54.00 37.80 37.80 210.00 522.9
54.00 10.80 10.80 60.00 149.4
40.004.0001
84.00 8.40 8.40 0.10 192.143
84.00 58.80 58.80 0.70 1345.001
84.00 16.80 16.80 0.20 384.286
50.001.6315
4.80 0.48 0.48 1.00 5.34
4.80 2.40 2.40 5.00 26.7
4.80 0.96 0.96 2.00 10.68
4.80 0.96 0.96 2.00 10.68
50.001.7021
7.20 0.72 0.72 2.00 8.02
7.20 3.60 3.60 10.00 40.1
7.20 1.44 1.44 4.00 16.04
7.20 1.44 1.44 4.00 16.04

20.001.0029
1.00 0.10 2.70 0.10 35.205
1.00 0.20 5.40 0.20 70.41
1.00 0.40 10.80 0.40 140.82
1.00 0.20 5.40 0.20 70.41
1.00 0.10 2.70 0.10 35.205
40.002.0005
1.00 0.10 6.00 0.10 75.678
1.00 0.20 12.00 0.20 151.356
1.00 0.40 24.00 0.40 302.712
1.00 0.20 12.00 0.20 151.356
1.00 0.10 6.00 0.10 75.678

70.001.4601
2,400.00 240.00 240.00 0.10 11105.388
2,400.00 240.00 240.00 0.10 11105.388
2,400.00 1,200.00 1,200.00 0.50 55526.94
2,400.00 480.00 480.00 0.20 22210.776
2,400.00 240.00 240.00 0.10 11105.388

20.001.0003
548.35 54.84 54.84 9.52 844.23
548.35 383.85 383.85 66.64 5,909.64
548.35 109.67 109.67 19.04 1,688.47
20.001.0005
403.51 40.35 40.35 7.82 640.77
403.51 282.46 282.46 54.74 4,485.40
403.51 80.70 80.70 15.64 1,281.54
20.002.0002
269.40 26.94 26.94 14.48 380.64
269.40 188.58 188.58 101.39 2,664.48
269.40 53.88 53.88 28.97 761.28
20.002.0003
7.34 0.73 0.73 0.34 10.35
7.34 5.14 5.14 2.38 72.42
7.34 1.47 1.47 0.68 20.69
20.002.0004
32.64 3.26 3.26 1.36 45.03
32.64 22.85 22.85 9.52 315.21
32.64 6.53 6.53 2.72 90.06
20.002.0005
24.48 2.45 2.45 0.82 33.53
24.48 17.14 17.14 5.71 234.71
24.48 4.90 4.90 1.63 67.06
20.002.0006
9.79 0.98 0.98 0.27 13.09
9.79 6.85 6.85 1.90 91.64
9.79 1.96 1.96 0.54 26.18
20.002.0032
26.52 2.65 2.65 3.40 56.54
26.52 18.56 18.56 23.80 395.79
26.52 5.30 5.30 6.80 113.08
20.002.0043
228.48 22.85 22.85 27.20 293.76
228.48 159.94 159.94 190.40 2,056.32
228.48 45.70 45.70 54.40 587.52
20.002.0057
229.50 22.95 22.95 8.50 286.54
229.50 160.65 160.65 59.50 2,005.75
229.50 45.90 45.90 17.00 573.07
20.002.0058
482.66 48.27 48.27 11.90 601.55
482.66 337.86 337.86 83.30 4,210.82
482.66 96.53 96.53 23.80 1,203.09
30.001.1307
26.32 2.63 2.63 5.10 38.40
26.32 18.42 18.42 35.70 268.82
26.32 5.26 5.26 10.20 76.81
30.001.3103
11.26 1.13 1.13 2.04 15.75
11.26 7.88 7.88 14.28 110.24
11.26 2.25 2.25 4.08 31.50
30.001.3310
9.79 0.98 0.98 2.72 14.06
9.79 6.85 6.85 19.04 98.44
9.79 1.96 1.96 5.44 28.12
30.001.6103
2.96 0.30 0.30 0.85 4.32
2.96 2.07 2.07 5.95 30.23
2.96 0.59 0.59 1.70 8.64
30.001.6308
10.34 1.03 1.03 2.21 15.09
10.34 7.24 7.24 15.47 105.66
10.34 2.07 2.07 4.42 30.19
30.001.6313
0.41 0.04 0.04 0.17 0.56
0.41 0.29 0.29 1.19 3.94
0.41 0.08 0.08 0.34 1.13
30.001.6314
7.75 0.78 0.78 3.40 10.57
7.75 5.43 5.43 23.80 74.02
7.75 1.55 1.55 6.80 21.15
30.001.6409
1.35 0.13 0.13 0.34 1.84
1.35 0.94 0.94 2.38 12.85
1.35 0.27 0.27 0.68 3.67
30.001.6410
1.22 0.12 0.12 0.34 1.68
1.22 0.86 0.86 2.38 11.73
1.22 0.24 0.24 0.68 3.35
30.001.6411
0.55 0.06 0.06 0.17 0.76
0.55 0.39 0.39 1.19 5.30
0.55 0.11 0.11 0.34 1.51
30.001.6412
1.02 0.10 0.10 0.34 1.39
1.02 0.71 0.71 2.38 9.73
1.02 0.20 0.20 0.68 2.78
30.001.6511
4.53 0.45 0.45 1.02 6.33
4.53 3.17 3.17 7.14 44.34
4.53 0.91 0.91 2.04 12.67
30.001.7012
8.16 0.82 0.82 3.40 11.22
8.16 5.71 5.71 23.80 78.54
8.16 1.63 1.63 6.80 22.44
30.001.8011
4.49 0.45 0.45 1.70 6.22
4.49 3.14 3.14 11.90 43.55
4.49 0.90 0.90 3.40 12.44
30.001.8012
5.10 0.51 0.51 1.70 7.06
5.10 3.57 3.57 11.90 49.39
5.10 1.02 1.02 3.40 14.11
30.001.9113
68.54 6.85 6.85 40.80 94.66
68.54 47.98 47.98 285.60 662.59
68.54 13.71 13.71 81.60 189.31
30.001.9114
111.38 11.14 11.14 66.30 157.13
111.38 77.97 77.97 464.10 1,099.92
111.38 22.28 22.28 132.60 314.26
30.002.1307
8.81 0.88 0.88 2.04 12.40
8.81 6.17 6.17 14.28 86.82
8.81 1.76 1.76 4.08 24.81
30.002.3103
35.97 3.60 3.60 6.97 48.51
35.97 25.18 25.18 48.79 339.58
35.97 7.19 7.19 13.94 97.02
30.002.3105
2.65 0.27 0.27 0.34 3.62
2.65 1.86 1.86 2.38 25.35
2.65 0.53 0.53 0.68 7.24
30.002.3310
27.42 2.74 2.74 9.52 38.75
27.42 19.19 19.19 66.64 271.22
27.42 5.48 5.48 19.04 77.49
30.002.6103
19.99 2.00 2.00 4.76 26.85
19.99 13.99 13.99 33.32 187.92
19.99 4.00 4.00 9.52 53.69
30.002.6308
25.30 2.53 2.53 6.80 36.92
25.30 17.71 17.71 47.60 258.47
25.30 5.06 5.06 13.60 73.85
30.002.6312
6.94 0.69 0.69 3.40 9.89
6.94 4.86 4.86 23.80 69.26
6.94 1.39 1.39 6.80 19.79
30.002.6313
1.71 0.17 0.17 1.02 2.28
1.71 1.20 1.20 7.14 15.99
1.71 0.34 0.34 2.04 4.57
30.002.6314
26.52 2.65 2.65 17.00 36.72
26.52 18.56 18.56 119.00 257.04
26.52 5.30 5.30 34.00 73.44
30.002.6315
14.69 1.47 1.47 10.20 20.50
14.69 10.28 10.28 71.40 143.51
14.69 2.94 2.94 20.40 41.00
30.002.6409
6.36 0.64 0.64 2.04 8.55
6.36 4.46 4.46 14.28 59.83
6.36 1.27 1.27 4.08 17.10
30.002.6410
5.88 0.59 0.59 2.04 7.85
5.88 4.11 4.11 14.28 54.98
5.88 1.18 1.18 4.08 15.71
30.002.6411
3.59 0.36 0.36 1.36 4.84
3.59 2.51 2.51 9.52 33.89
3.59 0.72 0.72 2.72 9.68
30.002.6412
4.90 0.49 0.49 2.04 6.59
4.90 3.43 3.43 14.28 46.12
4.90 0.98 0.98 4.08 13.18
30.002.6413
0.98 0.10 0.10 0.51 1.33
0.98 0.69 0.69 3.57 9.32
0.98 0.20 0.20 1.02 2.66
30.002.6508
3.57 0.36 0.36 0.85 5.21
3.57 2.50 2.50 5.95 36.47
3.57 0.71 0.71 1.70 10.42
30.002.6511
17.34 1.73 1.73 5.78 23.76
17.34 12.14 12.14 40.46 166.29
17.34 3.47 3.47 11.56 47.51
30.002.7012
53.04 5.30 5.30 22.10 72.27
53.04 37.13 37.13 154.70 505.87
53.04 10.61 10.61 44.20 144.53
30.002.7021
65.28 6.53 6.53 68.00 89.76
65.28 45.70 45.70 476.00 628.32
65.28 13.06 13.06 136.00 179.52
30.002.7022
21.22 2.12 2.12 13.60 29.24
21.22 14.85 14.85 95.20 204.68
21.22 4.24 4.24 27.20 58.48
30.002.7334
24.48 2.45 2.45 10.20 33.46
24.48 17.14 17.14 71.40 234.19
24.48 4.90 4.90 20.40 66.91
30.002.7338
28.15 2.82 2.82 10.20 38.56
28.15 19.71 19.71 71.40 269.89
28.15 5.63 5.63 20.40 77.11
30.002.8101
20.40 2.04 2.04 6.80 28.15
20.40 14.28 14.28 47.60 197.06
20.40 4.08 4.08 13.60 56.30
30.002.8102
12.24 1.22 1.22 5.10 16.93
12.24 8.57 8.57 35.70 118.52
12.24 2.45 2.45 10.20 33.86
30.002.8300
8.98 0.90 0.90 3.40 12.24
8.98 6.28 6.28 23.80 85.68
8.98 1.80 1.80 6.80 24.48
30.002.9114
78.54 7.85 7.85 59.50 108.89
78.54 54.98 54.98 416.50 762.20
78.54 15.71 15.71 119.00 217.77
40.001.0001
539.78 53.98 53.98 35.70 755.06
539.78 377.85 377.85 249.90 5,285.39
539.78 107.96 107.96 71.40 1,510.11
40.001.0002
35.25 3.53 3.53 10.88 48.74
35.25 24.68 24.68 76.16 341.20
35.25 7.05 7.05 21.76 97.48
40.002.0001
36.72 3.67 3.67 6.80 51.61
36.72 25.70 25.70 47.60 361.28
36.72 7.34 7.34 13.60 103.22
40.002.0002
47.98 4.80 4.80 14.28 67.26
47.98 33.59 33.59 99.96 470.81
47.98 9.60 9.60 28.56 134.52
40.002.0003
42.84 4.28 4.28 23.80 59.26
42.84 29.99 29.99 166.60 414.83
42.84 8.57 8.57 47.60 118.52
40.004.0001
171.36 17.14 17.14 0.20 391.97
171.36 119.95 119.95 1.43 2,743.80
171.36 34.27 34.27 0.41 783.94
40.005.0001
146.88 14.69 14.69 6.80 419.63
146.88 102.82 102.82 47.60 2,937.40
146.88 29.38 29.38 13.60 839.26
40.006.0004
57.12 5.71 5.71 0.14 174.64
57.12 39.98 39.98 0.95 1,222.48
57.12 11.42 11.42 0.27 349.28
50.001.1407
24.48 2.45 2.45 0.07 88.34
24.48 12.24 12.24 0.34 441.68
24.48 4.90 4.90 0.14 176.67
24.48 4.90 4.90 0.14 176.67
50.001.1427
12.24 1.22 1.22 0.03 44.17
12.24 6.12 6.12 0.17 220.84
12.24 2.45 2.45 0.07 88.34
12.24 2.45 2.45 0.07 88.34
50.001.3103
48.96 4.90 4.90 0.14 63.38
48.96 24.48 24.48 0.68 316.88
48.96 9.79 9.79 0.27 126.75
48.96 9.79 9.79 0.27 126.75
50.001.3105
20.40 2.04 2.04 0.07 27.15
20.40 10.20 10.20 0.34 135.75
20.40 4.08 4.08 0.14 54.30
20.40 4.08 4.08 0.14 54.30
50.001.3410
48.96 4.90 4.90 0.20 67.83
48.96 24.48 24.48 1.02 339.15
48.96 9.79 9.79 0.41 135.66
48.96 9.79 9.79 0.41 135.66
50.001.6103
8.81 0.88 0.88 0.41 9.81
8.81 4.41 4.41 2.04 49.04
8.81 1.76 1.76 0.82 19.62
8.81 1.76 1.76 0.82 19.62
50.001.6308
4.49 0.45 0.45 0.34 4.99
4.49 2.24 2.24 1.70 24.97
4.49 0.90 0.90 0.68 9.99
4.49 0.90 0.90 0.68 9.99
50.001.6313
0.82 0.08 0.08 0.14 0.91
0.82 0.41 0.41 0.68 4.54
0.82 0.16 0.16 0.27 1.82
0.82 0.16 0.16 0.27 1.82
50.001.6314
3.26 0.33 0.33 0.68 3.63
3.26 1.63 1.63 3.40 18.16
3.26 0.65 0.65 1.36 7.26
3.26 0.65 0.65 1.36 7.26
50.001.6315
0.82 0.08 0.08 0.17 0.91
0.82 0.41 0.41 0.85 4.54
0.82 0.16 0.16 0.34 1.82
0.82 0.16 0.16 0.34 1.82
50.001.6409
0.98 0.10 0.10 0.07 1.09
0.98 0.49 0.49 0.34 5.45
0.98 0.20 0.20 0.14 2.18
0.98 0.20 0.20 0.14 2.18
50.001.6410
3.92 0.39 0.39 0.27 4.36
3.92 1.96 1.96 1.36 21.79
3.92 0.78 0.78 0.54 8.71
3.92 0.78 0.78 0.54 8.71
50.001.6411
1.39 0.14 0.14 0.14 1.54
1.39 0.69 0.69 0.68 7.72
1.39 0.28 0.28 0.27 3.09
1.39 0.28 0.28 0.27 3.09
50.001.6412
0.59 0.06 0.06 0.07 0.65
0.59 0.29 0.29 0.34 3.27
0.59 0.12 0.12 0.14 1.31
0.59 0.12 0.12 0.14 1.31
50.001.6413
0.49 0.05 0.05 0.07 0.54
0.49 0.24 0.24 0.34 2.72
0.49 0.10 0.10 0.14 1.09
0.49 0.10 0.10 0.14 1.09
50.001.6508
2.12 0.21 0.21 0.14 2.36
2.12 1.06 1.06 0.68 11.80
2.12 0.42 0.42 0.27 4.72
2.12 0.42 0.42 0.27 4.72
50.001.6511
0.82 0.08 0.08 0.07 0.91
0.82 0.41 0.41 0.34 4.54
0.82 0.16 0.16 0.14 1.82
0.82 0.16 0.16 0.14 1.82
50.001.7012
5.22 0.52 0.52 0.54 5.81
5.22 2.61 2.61 2.72 29.05
5.22 1.04 1.04 1.09 11.62
5.22 1.04 1.04 1.09 11.62
50.001.7021
4.90 0.49 0.49 1.36 5.45
4.90 2.45 2.45 6.80 27.27
4.90 0.98 0.98 2.72 10.91
4.90 0.98 0.98 2.72 10.91
50.001.7334
3.26 0.33 0.33 0.34 3.63
3.26 1.63 1.63 1.70 18.16
3.26 0.65 0.65 0.68 7.26
3.26 0.65 0.65 0.68 7.26
50.001.7338
6.12 0.61 0.61 0.34 6.81
6.12 3.06 3.06 1.70 34.05
6.12 1.22 1.22 0.68 13.62
6.12 1.22 1.22 0.68 13.62
50.001.9113
24.48 2.45 2.45 10.20 27.23
24.48 12.24 12.24 51.00 136.17
24.48 4.90 4.90 20.40 54.47
24.48 4.90 4.90 20.40 54.47
60.002.0002
8.57 0.86 0.86 0.10 16.32
8.57 6.00 6.00 0.71 114.23
8.57 1.71 1.71 0.20 32.64
60.002.0004
7.34 0.73 0.73 0.07 21.78
7.34 5.14 5.14 0.48 152.48
7.34 1.47 1.47 0.14 43.57
60.002.0005
4.08 0.41 0.41 0.07 9.19
4.08 2.86 2.86 0.48 64.33
4.08 0.82 0.82 0.14 18.38
60.005.0062
40.80 4.08 4.08 0.34 96.17
40.80 28.56 28.56 2.38 673.18
40.80 8.16 8.16 0.68 192.34
60.005.0073
176.26 17.63 17.63 0.61 309.64
176.26 123.38 123.38 4.28 2,167.49
176.26 35.25 35.25 1.22 619.28
70.001.0006
61.20 6.12 6.12 0.03 91.94
61.20 36.72 36.72 0.20 551.63
61.20 6.12 6.12 0.03 91.94
61.20 12.24 12.24 0.07 183.88
70.001.0008
48.96 4.90 4.90 0.03 74.57
48.96 29.38 29.38 0.20 447.39
48.96 4.90 4.90 0.03 74.57
48.96 9.79 9.79 0.07 149.13
70.004.0001
16.32 1.63 1.63 0.03 31.27
16.32 9.79 9.79 0.20 187.61
16.32 1.63 1.63 0.03 31.27
16.32 3.26 3.26 0.07 62.54
70.004.0002
48.96 4.90 4.90 0.10 87.60
48.96 29.38 29.38 0.61 525.60
48.96 4.90 4.90 0.10 87.60
48.96 9.79 9.79 0.20 175.20
70.004.0003
16.32 1.63 1.63 0.03 29.94
16.32 9.79 9.79 0.20 179.64
16.32 1.63 1.63 0.03 29.94
16.32 3.26 3.26 0.07 59.88
70.004.0004
16.32 1.63 1.63 0.03 29.94
16.32 9.79 9.79 0.20 179.64
16.32 1.63 1.63 0.03 29.94
16.32 3.26 3.26 0.07 59.88
70.005.0003
130.56 13.06 13.06 0.03 320.64
130.56 78.34 78.34 0.20 1,923.85
130.56 13.06 13.06 0.03 320.64
130.56 26.11 26.11 0.07 641.28
70.005.0006
342.72 34.27 34.27 0.03 633.74
342.72 205.63 205.63 0.20 3,802.46
342.72 34.27 34.27 0.03 633.74
342.72 68.54 68.54 0.07 1,267.49
70.006.0001
199.92 19.99 19.99 0.03 423.00
199.92 119.95 119.95 0.20 2,538.02
199.92 19.99 19.99 0.03 423.00
199.92 39.98 39.98 0.07 846.01
70.006.0002
171.36 17.14 17.14 0.03 380.85
171.36 102.82 102.82 0.20 2,285.12
171.36 17.14 17.14 0.03 380.85
171.36 34.27 34.27 0.07 761.71
70.006.0005
48.96 4.90 4.90 0.03 196.15
48.96 29.38 29.38 0.20 1,176.88
48.96 4.90 4.90 0.03 196.15
48.96 9.79 9.79 0.07 392.29
70.008.0101
20.40 2.04 2.04 0.03 29.36
20.40 12.24 12.24 0.20 176.18
20.40 2.04 2.04 0.03 29.36
20.40 4.08 4.08 0.07 58.73
70.009.0002
16.32 1.63 1.63 0.03 23.67
16.32 9.79 9.79 0.20 142.05
16.32 1.63 1.63 0.03 23.67
16.32 3.26 3.26 0.07 47.35
70.020.0000
1,530.00 153.00 153.00 0.03 1,020.00
1,530.00 918.00 918.00 0.20 6,120.00
1,530.00 153.00 153.00 0.03 1,020.00
1,530.00 306.00 306.00 0.07 2,040.00

25.001.0001
3,950.92 3,950.92 118.80 276.29 3950.9184 0.02
25.001.0002
772.20 772.20 23.22 54.00 772.2 0.02
25.003.0001
10,428.77 10,428.77 776.16 470.40 10428.768 0.13
25.003.0002
3,719.72 3,719.72 404.08 90.20 3719.716032 0.40
30.002.0001
7,874.21 7,874.21 486.27 276.29 7874.208 0.13
30.002.0002
1,539.00 1,539.00 95.04 54.00 1539 0.13
30.003.0004
24,470.21 24,470.21 1,651.10 470.40 24470.208 0.33
30.003.0005
4,977.06 4,977.06 322.00 90.20 4977.059424 0.34

20.001.0001
0.00 0.00 0.00 81.96 0
0.00 0.00 0.00 16.39 0
0.00 0.00 0.00 65.57 0
20.001.0002
60.13 30.06 30.06 81.96 347.531592155
60.13 6.01 6.01 16.39 69.5063184311
60.13 24.05 24.05 65.57 278.025273724
20.001.0101
0.00 0.00 0.00 81.96 0
0.00 0.00 0.00 16.39 0
0.00 0.00 0.00 65.57 0
20.001.0102
62.85 31.43 31.43 81.96 363.924591785
62.85 6.29 6.29 16.39 72.7849183571
62.85 25.14 25.14 65.57 291.139673428
20.001.0003
0.00 0.00 0.00 66.75 0
0.00 0.00 0.00 13.35 0
0.00 0.00 0.00 53.40 0
20.001.0004
41.98 20.99 20.99 66.75 243.6557445
41.98 4.20 4.20 13.35 48.7311489
41.98 16.79 16.79 53.40 194.9245956
20.001.0103
0.00 0.00 0.00 66.75 0
0.00 0.00 0.00 13.35 0
0.00 0.00 0.00 53.40 0
20.001.0104
43.88 21.94 21.94 66.75 255.004094244
43.88 4.39 4.39 13.35 51.0008188488
43.88 17.55 17.55 53.40 204.003275395
20.002.0001
0.00 0.00 0.00 585.50 0
0.00 0.00 0.00 117.10 0
0.00 0.00 0.00 468.40 0
20.002.0002
368.16 184.08 184.08 585.50 2137.075
368.16 36.82 36.82 117.10 427.415
368.16 147.26 147.26 468.40 1709.66
40.001.0001
31.80 9.54 9.54 134.55 248.91750344
31.80 4.77 4.77 67.28 124.45875172
31.80 4.77 4.77 67.28 124.45875172
31.80 12.72 12.72 179.40 331.890004587
40.001.0002
199.09 59.73 59.73 842.40 1558.44002752
199.09 29.86 29.86 421.20 779.220013762
199.09 29.86 29.86 421.20 779.220013762
199.09 79.63 79.63 1,123.20 2077.9200367
40.001.0005
799.11 239.73 239.73 3,381.30 6255.40477982
799.11 119.87 119.87 1,690.65 3127.70238991
799.11 119.87 119.87 1,690.65 3127.70238991
799.11 319.65 319.65 4,508.40 8340.53970642
40.001.0006
543.09 162.93 162.93 2,298.00 4251.29991531
543.09 81.46 81.46 1,149.00 2125.64995766
543.09 81.46 81.46 1,149.00 2125.64995766
543.09 217.24 217.24 3,064.00 5668.39988708
40.001.0009
239.64 71.89 71.89 1,014.00 1875.89995766
239.64 35.95 35.95 507.00 937.949978828
239.64 35.95 35.95 507.00 937.949978828
239.64 95.86 95.86 1,352.00 2501.19994354
40.001.0026
518.99 155.70 155.70 2,196.00 4062.6
518.99 77.85 77.85 1,098.00 2031.3
518.99 77.85 77.85 1,098.00 2031.3
518.99 207.60 207.60 2,928.00 5416.8
40.001.0064
164.49 49.35 49.35 696.00 1287.60004234
164.49 24.67 24.67 348.00 643.800021172
164.49 24.67 24.67 348.00 643.800021172
164.49 65.80 65.80 928.00 1716.80005646
40.001.0069
187.18 56.15 56.15 792.00 1465.19997883
187.18 28.08 28.08 396.00 732.599989414
187.18 28.08 28.08 396.00 732.599989414
187.18 74.87 74.87 1,056.00 1953.59997177
40.002.2169
1,018.74 101.87 101.87 2.64 1766.00157448
1,018.74 203.75 203.75 5.28 3532.00314896
1,018.74 101.87 101.87 2.64 1766.00157448
1,018.74 356.56 356.56 9.24 6181.00551069
1,018.74 101.87 101.87 2.64 1766.00157448
1,018.74 50.94 50.94 1.32 883.000787241
1,018.74 101.87 101.87 2.64 1766.00157448
40.002.2801
55.36 5.54 5.54 0.35 126.763351752
55.36 11.07 11.07 0.69 253.526703504
55.36 24.91 24.91 1.55 570.435082884
55.36 5.54 5.54 0.35 126.763351752
55.36 2.77 2.77 0.17 63.381675876
55.36 5.54 5.54 0.35 126.763351752
40.002.2802
76.76 7.68 7.68 2.16 469.648808294
76.76 15.35 15.35 4.32 939.297616589
76.76 34.54 34.54 9.72 2113.41963732
76.76 7.68 7.68 2.16 469.648808294
76.76 3.84 3.84 1.08 234.824404147
76.76 7.68 7.68 2.16 469.648808294
40.002.2805
282.16 28.22 28.22 8.67 1997.2211297
282.16 56.43 56.43 17.34 3994.4422594
282.16 126.97 126.97 39.01 8987.49508365
282.16 28.22 28.22 8.67 1997.2211297
282.16 14.11 14.11 4.33 998.61056485
282.16 28.22 28.22 8.67 1997.2211297
40.002.2806
174.07 17.41 17.41 7.66 1600.55696812
174.07 34.81 34.81 15.32 3201.11393623
174.07 78.33 78.33 34.47 7202.50635653
174.07 17.41 17.41 7.66 1600.55696812
174.07 8.70 8.70 3.83 800.278484058
174.07 17.41 17.41 7.66 1600.55696812
40.002.2809
375.48 37.55 37.55 1.69 708.39728401
375.48 75.10 75.10 3.38 1416.79456802
375.48 37.55 37.55 1.69 708.39728401
375.48 131.42 131.42 5.91 2479.39049403
375.48 37.55 37.55 1.69 708.39728401
375.48 18.77 18.77 0.84 354.198642005
375.48 37.55 37.55 1.69 708.39728401
40.002.2826
1,621.65 162.16 162.16 6.10 2995.832
1,621.65 324.33 324.33 12.20 5991.664
1,621.65 162.16 162.16 6.10 2995.832
1,621.65 567.58 567.58 21.35 10485.412
1,621.65 162.16 162.16 6.10 2995.832
1,621.65 81.08 81.08 3.05 1497.916
1,621.65 162.16 162.16 6.10 2995.832
40.002.1564
1,258.64 125.86 125.86 6.91 2438.41536
1,258.64 251.73 251.73 13.82 4876.83072
1,258.64 188.80 188.80 10.37 3657.62304
1,258.64 377.59 377.59 20.74 7315.24608
1,258.64 125.86 125.86 6.91 2438.41536
1,258.64 62.93 62.93 3.46 1219.20768
1,258.64 125.86 125.86 6.91 2438.41536
60.002.1061
60.92 15.23 15.23 3.40 687.68398915
60.92 18.28 18.28 4.08 825.22078698
60.92 15.23 15.23 3.40 687.68398915
60.92 6.09 6.09 1.36 275.07359566
60.92 6.09 6.09 1.36 275.07359566

20.001.0003
1,064.45 106.44 106.44 18.48 1638.8064
1,064.45 745.11 745.11 129.36 11471.6448
1,064.45 212.89 212.89 36.96 3277.6128
20.001.0005
783.29 78.33 78.33 15.18 1243.8492
783.29 548.30 548.30 106.26 8706.9444
783.29 156.66 156.66 30.36 2487.6984
20.002.0002
522.96 52.30 52.30 28.12 738.88848
522.96 366.07 366.07 196.81 5172.21936
522.96 104.59 104.59 56.23 1477.77696
20.002.0003
14.26 1.43 1.43 0.66 20.0838
14.26 9.98 9.98 4.62 140.5866
14.26 2.85 2.85 1.32 40.1676
20.002.0004
63.36 6.34 6.34 2.64 87.4104
63.36 44.35 44.35 18.48 611.8728
63.36 12.67 12.67 5.28 174.8208
20.002.0005
47.52 4.75 4.75 1.58 65.08656
47.52 33.26 33.26 11.09 455.60592
47.52 9.50 9.50 3.17 130.17312
20.002.0006
19.01 1.90 1.90 0.53 25.41264
19.01 13.31 13.31 3.70 177.88848
19.01 3.80 3.80 1.06 50.82528
20.002.0032
51.48 5.15 5.15 6.60 109.758
51.48 36.04 36.04 46.20 768.306
51.48 10.30 10.30 13.20 219.516
20.002.0043
443.52 44.35 44.35 52.80 570.24
443.52 310.46 310.46 369.60 3991.68
443.52 88.70 88.70 105.60 1140.48
20.002.0057
445.50 44.55 44.55 16.50 556.215
445.50 311.85 311.85 115.50 3893.505
445.50 89.10 89.10 33.00 1112.43
20.002.0058
936.94 93.69 93.69 23.10 1167.705
936.94 655.86 655.86 161.70 8173.935
936.94 187.39 187.39 46.20 2335.41
30.001.1307
51.08 5.11 5.11 9.90 74.547
51.08 35.76 35.76 69.30 521.829
51.08 10.22 10.22 19.80 149.094
30.001.3103
21.86 2.19 2.19 3.96 30.5712
21.86 15.30 15.30 27.72 213.9984
21.86 4.37 4.37 7.92 61.1424
30.001.3310
19.01 1.90 1.90 5.28 27.2976
19.01 13.31 13.31 36.96 191.0832
19.01 3.80 3.80 10.56 54.5952
30.001.6103
5.74 0.57 0.57 1.65 8.382
5.74 4.02 4.02 11.55 58.674
5.74 1.15 1.15 3.30 16.764
30.001.6308
20.08 2.01 2.01 4.29 29.3007
20.08 14.05 14.05 30.03 205.1049
20.08 4.02 4.02 8.58 58.6014
30.001.6313
0.79 0.08 0.08 0.33 1.0923
0.79 0.55 0.55 2.31 7.6461
0.79 0.16 0.16 0.66 2.1846
30.001.6314
15.05 1.50 1.50 6.60 20.526
15.05 10.53 10.53 46.20 143.682
15.05 3.01 3.01 13.20 41.052
30.001.6409
2.61 0.26 0.26 0.66 3.564
2.61 1.83 1.83 4.62 24.948
2.61 0.52 0.52 1.32 7.128
30.001.6410
2.38 0.24 0.24 0.66 3.2538
2.38 1.66 1.66 4.62 22.7766
2.38 0.48 0.48 1.32 6.5076
30.001.6411
1.07 0.11 0.11 0.33 1.4685
1.07 0.75 0.75 2.31 10.2795
1.07 0.21 0.21 0.66 2.937
30.001.6412
1.98 0.20 0.20 0.66 2.6994
1.98 1.39 1.39 4.62 18.8958
1.98 0.40 0.40 1.32 5.3988
30.001.6511
8.79 0.88 0.88 1.98 12.2958
8.79 6.15 6.15 13.86 86.0706
8.79 1.76 1.76 3.96 24.5916
30.001.7012
15.84 1.58 1.58 6.60 21.78
15.84 11.09 11.09 46.20 152.46
15.84 3.17 3.17 13.20 43.56
30.001.8011
8.71 0.87 0.87 3.30 12.078
8.71 6.10 6.10 23.10 84.546
8.71 1.74 1.74 6.60 24.156
30.001.8012
9.90 0.99 0.99 3.30 13.695
9.90 6.93 6.93 23.10 95.865
9.90 1.98 1.98 6.60 27.39
30.001.9113
133.06 13.31 13.31 79.20 183.744
133.06 93.14 93.14 554.40 1286.208
133.06 26.61 26.61 158.40 367.488
30.001.9114
216.22 21.62 21.62 128.70 305.019
216.22 151.35 151.35 900.90 2135.133
216.22 43.24 43.24 257.40 610.038
30.002.1307
17.11 1.71 1.71 3.96 24.0768
17.11 11.98 11.98 27.72 168.5376
17.11 3.42 3.42 7.92 48.1536
30.002.3103
69.81 6.98 6.98 13.53 94.1688
69.81 48.87 48.87 94.71 659.1816
69.81 13.96 13.96 27.06 188.3376
30.002.3105
5.15 0.51 0.51 0.66 7.029
5.15 3.60 3.60 4.62 49.203
5.15 1.03 1.03 1.32 14.058
30.002.3310
53.22 5.32 5.32 18.48 75.2136
53.22 37.26 37.26 129.36 526.4952
53.22 10.64 10.64 36.96 150.4272
30.002.6103
38.81 3.88 3.88 9.24 52.1136
38.81 27.17 27.17 64.68 364.7952
38.81 7.76 7.76 18.48 104.2272
30.002.6308
49.10 4.91 4.91 13.20 71.676
49.10 34.37 34.37 92.40 501.732
49.10 9.82 9.82 26.40 143.352
30.002.6312
13.46 1.35 1.35 6.60 19.206
13.46 9.42 9.42 46.20 134.442
13.46 2.69 2.69 13.20 38.412
30.002.6313
3.33 0.33 0.33 1.98 4.4352
3.33 2.33 2.33 13.86 31.0464
3.33 0.67 0.67 3.96 8.8704
30.002.6314
51.48 5.15 5.15 33.00 71.28
51.48 36.04 36.04 231.00 498.96
51.48 10.30 10.30 66.00 142.56
30.002.6315
28.51 2.85 2.85 19.80 39.798
28.51 19.96 19.96 138.60 278.586
28.51 5.70 5.70 39.60 79.596
30.002.6409
12.36 1.24 1.24 3.96 16.5924
12.36 8.65 8.65 27.72 116.1468
12.36 2.47 2.47 7.92 33.1848
30.002.6410
11.40 1.14 1.14 3.96 15.246
11.40 7.98 7.98 27.72 106.722
11.40 2.28 2.28 7.92 30.492
30.002.6411
6.97 0.70 0.70 2.64 9.3984
6.97 4.88 4.88 18.48 65.7888
6.97 1.39 1.39 5.28 18.7968
30.002.6412
9.50 0.95 0.95 3.96 12.7908
9.50 6.65 6.65 27.72 89.5356
9.50 1.90 1.90 7.92 25.5816
30.002.6413
1.90 0.19 0.19 0.99 2.5839
1.90 1.33 1.33 6.93 18.0873
1.90 0.38 0.38 1.98 5.1678
30.002.6508
6.93 0.69 0.69 1.65 10.1145
6.93 4.85 4.85 11.55 70.8015
6.93 1.39 1.39 3.30 20.229
30.002.6511
33.66 3.37 3.37 11.22 46.1142
33.66 23.56 23.56 78.54 322.7994
33.66 6.73 6.73 22.44 92.2284
30.002.7012
102.96 10.30 10.30 42.90 140.283
102.96 72.07 72.07 300.30 981.981
102.96 20.59 20.59 85.80 280.566
30.002.7021
126.72 12.67 12.67 132.00 174.24
126.72 88.70 88.70 924.00 1219.68
126.72 25.34 25.34 264.00 348.48
30.002.7022
41.18 4.12 4.12 26.40 56.76
41.18 28.83 28.83 184.80 397.32
41.18 8.24 8.24 52.80 113.52
30.002.7334
47.52 4.75 4.75 19.80 64.944
47.52 33.26 33.26 138.60 454.608
47.52 9.50 9.50 39.60 129.888
30.002.7338
54.65 5.46 5.46 19.80 74.844
54.65 38.25 38.25 138.60 523.908
54.65 10.93 10.93 39.60 149.688
30.002.8101
39.60 3.96 3.96 13.20 54.648
39.60 27.72 27.72 92.40 382.536
39.60 7.92 7.92 26.40 109.296
30.002.8102
23.76 2.38 2.38 9.90 32.868
23.76 16.63 16.63 69.30 230.076
23.76 4.75 4.75 19.80 65.736
30.002.8300
17.42 1.74 1.74 6.60 23.76
17.42 12.20 12.20 46.20 166.32
17.42 3.48 3.48 13.20 47.52
30.002.9114
152.46 15.25 15.25 115.50 211.365
152.46 106.72 106.72 808.50 1479.555
152.46 30.49 30.49 231.00 422.73
40.001.0001
1,047.82 104.78 104.78 69.30 1465.695
1,047.82 733.47 733.47 485.10 10259.865
1,047.82 209.56 209.56 138.60 2931.39
40.001.0002
68.43 6.84 6.84 21.12 94.6176
68.43 47.90 47.90 147.84 662.3232
68.43 13.69 13.69 42.24 189.2352
40.002.0001
71.28 7.13 7.13 13.20 100.188
71.28 49.90 49.90 92.40 701.316
71.28 14.26 14.26 26.40 200.376
40.002.0002
93.14 9.31 9.31 27.72 130.5612
93.14 65.20 65.20 194.04 913.9284
93.14 18.63 18.63 55.44 261.1224
40.002.0003
83.16 8.32 8.32 46.20 115.038
83.16 58.21 58.21 323.40 805.266
83.16 16.63 16.63 92.40 230.076
40.004.0001
332.64 33.26 33.26 0.40 760.88628
332.64 232.85 232.85 2.77 5326.20396
332.64 66.53 66.53 0.79 1521.77256
40.005.0001
285.12 28.51 28.51 13.20 814.572
285.12 199.58 199.58 92.40 5702.004
285.12 57.02 57.02 26.40 1629.144
40.006.0004
110.88 11.09 11.09 0.26 339.00768
110.88 77.62 77.62 1.85 2373.05376
110.88 22.18 22.18 0.53 678.01536
50.001.1407
47.52 4.75 4.75 0.13 171.4746
47.52 23.76 23.76 0.66 857.373
47.52 9.50 9.50 0.26 342.9492
47.52 9.50 9.50 0.26 342.9492
50.001.1427
23.76 2.38 2.38 0.07 85.73862
23.76 11.88 11.88 0.33 428.6931
23.76 4.75 4.75 0.13 171.47724
23.76 4.75 4.75 0.13 171.47724
50.001.3103
95.04 9.50 9.50 0.26 123.024
95.04 47.52 47.52 1.32 615.12
95.04 19.01 19.01 0.53 246.048
95.04 19.01 19.01 0.53 246.048
50.001.3105
39.60 3.96 3.96 0.13 52.701
39.60 19.80 19.80 0.66 263.505
39.60 7.92 7.92 0.26 105.402
39.60 7.92 7.92 0.26 105.402
50.001.3410
95.04 9.50 9.50 0.40 131.67
95.04 47.52 47.52 1.98 658.35
95.04 19.01 19.01 0.79 263.34
95.04 19.01 19.01 0.79 263.34
50.001.6103
17.11 1.71 1.71 0.79 19.03968
17.11 8.55 8.55 3.96 95.1984
17.11 3.42 3.42 1.58 38.07936
17.11 3.42 3.42 1.58 38.07936
50.001.6308
8.71 0.87 0.87 0.66 9.6954
8.71 4.36 4.36 3.30 48.477
8.71 1.74 1.74 1.32 19.3908
8.71 1.74 1.74 1.32 19.3908
50.001.6313
1.58 0.16 0.16 0.26 1.76352
1.58 0.79 0.79 1.32 8.8176
1.58 0.32 0.32 0.53 3.52704
1.58 0.32 0.32 0.53 3.52704
50.001.6314
6.34 0.63 0.63 1.32 7.0488
6.34 3.17 3.17 6.60 35.244
6.34 1.27 1.27 2.64 14.0976
6.34 1.27 1.27 2.64 14.0976
50.001.6315
1.58 0.16 0.16 0.33 1.7622
1.58 0.79 0.79 1.65 8.811
1.58 0.32 0.32 0.66 3.5244
1.58 0.32 0.32 0.66 3.5244
50.001.6409
1.90 0.19 0.19 0.13 2.11464
1.90 0.95 0.95 0.66 10.5732
1.90 0.38 0.38 0.26 4.22928
1.90 0.38 0.38 0.26 4.22928
50.001.6410
7.60 0.76 0.76 0.53 8.45856
7.60 3.80 3.80 2.64 42.2928
7.60 1.52 1.52 1.06 16.91712
7.60 1.52 1.52 1.06 16.91712
50.001.6411
2.69 0.27 0.27 0.26 2.9964
2.69 1.35 1.35 1.32 14.982
2.69 0.54 0.54 0.53 5.9928
2.69 0.54 0.54 0.53 5.9928
50.001.6412
1.14 0.11 0.11 0.13 1.26852
1.14 0.57 0.57 0.66 6.3426
1.14 0.23 0.23 0.26 2.53704
1.14 0.23 0.23 0.26 2.53704
50.001.6413
0.95 0.10 0.10 0.13 1.05732
0.95 0.48 0.48 0.66 5.2866
0.95 0.19 0.19 0.26 2.11464
0.95 0.19 0.19 0.26 2.11464
50.001.6508
4.12 0.41 0.41 0.26 4.58304
4.12 2.06 2.06 1.32 22.9152
4.12 0.82 0.82 0.53 9.16608
4.12 0.82 0.82 0.53 9.16608
50.001.6511
1.58 0.16 0.16 0.13 1.7622
1.58 0.79 0.79 0.66 8.811
1.58 0.32 0.32 0.26 3.5244
1.58 0.32 0.32 0.26 3.5244
50.001.7012
10.14 1.01 1.01 1.06 11.27808
10.14 5.07 5.07 5.28 56.3904
10.14 2.03 2.03 2.11 22.55616
10.14 2.03 2.03 2.11 22.55616
50.001.7021
9.50 0.95 0.95 2.64 10.5864
9.50 4.75 4.75 13.20 52.932
9.50 1.90 1.90 5.28 21.1728
9.50 1.90 1.90 5.28 21.1728
50.001.7334
6.34 0.63 0.63 0.66 7.0488
6.34 3.17 3.17 3.30 35.244
6.34 1.27 1.27 1.32 14.0976
6.34 1.27 1.27 1.32 14.0976
50.001.7338
11.88 1.19 1.19 0.66 13.2198
11.88 5.94 5.94 3.30 66.099
11.88 2.38 2.38 1.32 26.4396
11.88 2.38 2.38 1.32 26.4396
50.001.9113
47.52 4.75 4.75 19.80 52.866
47.52 23.76 23.76 99.00 264.33
47.52 9.50 9.50 39.60 105.732
47.52 9.50 9.50 39.60 105.732
60.002.0002
16.63 1.66 1.66 0.20 31.67604
16.63 11.64 11.64 1.39 221.73228
16.63 3.33 3.33 0.40 63.35208
60.002.0004
14.26 1.43 1.43 0.13 42.28488
14.26 9.98 9.98 0.92 295.99416
14.26 2.85 2.85 0.26 84.56976
60.002.0005
7.92 0.79 0.79 0.13 17.83848
7.92 5.54 5.54 0.92 124.86936
7.92 1.58 1.58 0.26 35.67696
60.005.0062
79.20 7.92 7.92 0.66 186.681
79.20 55.44 55.44 4.62 1306.767
79.20 15.84 15.84 1.32 373.362
60.005.0073
342.14 34.21 34.21 1.19 601.0686
342.14 239.50 239.50 8.32 4207.4802
342.14 68.43 68.43 2.38 1202.1372
70.001.0006
118.80 11.88 11.88 0.07 178.4673
118.80 71.28 71.28 0.40 1070.8038
118.80 11.88 11.88 0.07 178.4673
118.80 23.76 23.76 0.13 356.9346
70.001.0008
95.04 9.50 9.50 0.07 144.74526
95.04 57.02 57.02 0.40 868.47156
95.04 9.50 9.50 0.07 144.74526
95.04 19.01 19.01 0.13 289.49052
70.004.0001
31.68 3.17 3.17 0.07 60.69756
31.68 19.01 19.01 0.40 364.18536
31.68 3.17 3.17 0.07 60.69756
31.68 6.34 6.34 0.13 121.39512
70.004.0002
95.04 9.50 9.50 0.20 170.04636
95.04 57.02 57.02 1.19 1020.27816
95.04 9.50 9.50 0.20 170.04636
95.04 19.01 19.01 0.40 340.09272
70.004.0003
31.68 3.17 3.17 0.07 58.12026
31.68 19.01 19.01 0.40 348.72156
31.68 3.17 3.17 0.07 58.12026
31.68 6.34 6.34 0.13 116.24052
70.004.0004
31.68 3.17 3.17 0.07 58.12026
31.68 19.01 19.01 0.40 348.72156
31.68 3.17 3.17 0.07 58.12026
31.68 6.34 6.34 0.13 116.24052
70.005.0003
253.44 25.34 25.34 0.07 622.42356
253.44 152.06 152.06 0.40 3734.54136
253.44 25.34 25.34 0.07 622.42356
253.44 50.69 50.69 0.13 1244.84712
70.005.0006
665.28 66.53 66.53 0.07 1230.20766
665.28 399.17 399.17 0.40 7381.24596
665.28 66.53 66.53 0.07 1230.20766
665.28 133.06 133.06 0.13 2460.41532
70.006.0001
388.08 38.81 38.81 0.07 821.1225
388.08 232.85 232.85 0.40 4926.735
388.08 38.81 38.81 0.07 821.1225
388.08 77.62 77.62 0.13 1642.245
70.006.0002
332.64 33.26 33.26 0.07 739.30494
332.64 199.58 199.58 0.40 4435.82964
332.64 33.26 33.26 0.07 739.30494
332.64 66.53 66.53 0.13 1478.60988
70.006.0005
95.04 9.50 9.50 0.07 380.75466
95.04 57.02 57.02 0.40 2284.52796
95.04 9.50 9.50 0.07 380.75466
95.04 19.01 19.01 0.13 761.50932
70.008.0101
39.60 3.96 3.96 0.07 57.0009
39.60 23.76 23.76 0.40 342.0054
39.60 3.96 3.96 0.07 57.0009
39.60 7.92 7.92 0.13 114.0018
70.009.0002
31.68 3.17 3.17 0.07 45.95712
31.68 19.01 19.01 0.40 275.74272
31.68 3.17 3.17 0.07 45.95712
31.68 6.34 6.34 0.13 91.91424
70.020.0000
2,970.00 297.00 297.00 0.07 1980
2,970.00 1,782.00 1,782.00 0.40 11880
2,970.00 297.00 297.00 0.07 1980
2,970.00 594.00 594.00 0.13 3960

20.001.0009
1.00 0.10 1.44 0.10 22.071
1.00 0.20 2.88 0.20 44.142
1.00 0.40 5.76 0.40 88.284
1.00 0.20 2.88 0.20 44.142
1.00 0.10 1.44 0.10 22.071
20.001.00X4
1.00 0.10 3.18 0.10 50
1.00 0.20 6.36 0.20 100
1.00 0.40 12.72 0.40 200
1.00 0.20 6.36 0.20 100
1.00 0.10 3.18 0.10 50
20.006.0002
1.00 0.10 5.40 0.10 70.135
1.00 0.20 10.80 0.20 140.27
1.00 0.40 21.60 0.40 280.54
1.00 0.20 10.80 0.20 140.27
1.00 0.10 5.40 0.10 70.135
40.002.0005
1.00 0.10 6.00 0.10 75.678
1.00 0.20 12.00 0.20 151.356
1.00 0.40 24.00 0.40 302.712
1.00 0.20 12.00 0.20 151.356
1.00 0.10 6.00 0.10 75.678

20.003.0001
3,477.00 3,477.00 95.00 475.00 3477 0.00
30.004.0002
196,381.86 196,381.86 4,064.84 16,530.46 196381.8648 0.03
30.007.0001
5,170.05 5,170.05 139.73 3,493.28 5170.0544 0.00

25.001.0001
11,631.62 11,631.62 349.76 813.40 11631.62 0.02
25.001.0002
2,059.20 2,059.20 61.92 144.00 2059.2 0.02
25.003.0001
15,014.63 15,014.63 1,117.46 677.25 15014.6325 0.13
25.003.0002
3,719.72 3,719.72 404.08 90.20 3719.716032 0.40
25.003.0003
1,855.80 1,855.80 201.60 45.00 1855.8 0.40
30.002.0001
23,180.76 23,180.76 1,431.51 813.36 23180.76 0.13
30.002.0002
4,104.00 4,104.00 253.44 144.00 4104 0.13
30.003.0004
35,230.55 35,230.55 2,377.15 677.25 35230.545 0.33
30.003.0005
4,977.06 4,977.06 322.00 90.20 4977.059424 0.34
30.003.0006
2,483.10 2,483.10 160.65 45.00 2483.1 0.34

20.001.0001
0.00 0.00 0.00 81.48 0
0.00 0.00 0.00 16.30 0
0.00 0.00 0.00 65.18 0
20.001.0002
59.77 29.89 29.89 81.48 345.475184311
59.77 5.98 5.98 16.30 69.0950368622
59.77 23.91 23.91 65.18 276.380147449
20.001.0101
0.00 0.00 0.00 81.48 0
0.00 0.00 0.00 16.30 0
0.00 0.00 0.00 65.18 0
20.001.0102
62.48 31.24 31.24 81.48 361.771183571
62.48 6.25 6.25 16.30 72.3542367142
62.48 24.99 24.99 65.18 289.416946857
20.001.0003
0.00 0.00 0.00 66.36 0
0.00 0.00 0.00 13.27 0
0.00 0.00 0.00 53.09 0
20.001.0004
41.73 20.86 20.86 66.36 242.213989
41.73 4.17 4.17 13.27 48.4427978001
41.73 16.69 16.69 53.09 193.7711912
20.001.0103
0.00 0.00 0.00 66.36 0
0.00 0.00 0.00 13.27 0
0.00 0.00 0.00 53.09 0
20.001.0104
43.63 21.81 21.81 66.36 253.495188488
43.63 4.36 4.36 13.27 50.6990376976
43.63 17.45 17.45 53.09 202.79615079
20.002.0001
0.00 0.00 0.00 753.00 0
0.00 0.00 0.00 150.60 0
0.00 0.00 0.00 602.40 0
20.002.0002
473.49 236.74 236.74 753.00 2748.45
473.49 47.35 47.35 150.60 549.69
473.49 189.39 189.39 602.40 2198.76
40.001.0001
40.55 12.17 12.17 171.60 317.460006881
40.55 6.08 6.08 85.80 158.73000344
40.55 6.08 6.08 85.80 158.73000344
40.55 16.22 16.22 228.80 423.280009174
40.001.0002
217.52 65.26 65.26 920.40 1702.74002752
217.52 32.63 32.63 460.20 851.370013762
217.52 32.63 32.63 460.20 851.370013762
217.52 87.01 87.01 1,227.20 2270.3200367
40.001.0005
973.32 291.99 291.99 4,118.40 7619.03988991
973.32 146.00 146.00 2,059.20 3809.51994495
973.32 146.00 146.00 2,059.20 3809.51994495
973.32 389.33 389.33 5,491.20 10158.7198532
40.001.0006
748.70 224.61 224.61 3,168.00 5860.79991531
748.70 112.31 112.31 1,584.00 2930.39995766
748.70 112.31 112.31 1,584.00 2930.39995766
748.70 299.48 299.48 4,224.00 7814.39988708
40.001.0009
238.22 71.47 71.47 1,008.00 1864.79991531
238.22 35.73 35.73 504.00 932.399957657
238.22 35.73 35.73 504.00 932.399957657
238.22 95.29 95.29 1,344.00 2486.39988708
40.001.0026
585.35 175.61 175.61 2,476.80 4582.08020325
585.35 87.80 87.80 1,238.40 2291.04010162
585.35 87.80 87.80 1,238.40 2291.04010162
585.35 234.14 234.14 3,302.40 6109.440271
40.001.0064
200.29 60.09 60.09 847.50 1567.875
200.29 30.04 30.04 423.75 783.9375
200.29 30.04 30.04 423.75 783.9375
200.29 80.12 80.12 1,130.00 2090.5
40.001.0069
420.15 126.05 126.05 1,777.80 3288.93009527
420.15 63.02 63.02 888.90 1644.46504764
420.15 63.02 63.02 888.90 1644.46504764
420.15 168.06 168.06 2,370.40 4385.24012703
40.002.2169
1,995.03 199.50 199.50 5.17 3458.41991483
1,995.03 399.01 399.01 10.34 6916.83982966
1,995.03 199.50 199.50 5.17 3458.41991483
1,995.03 698.26 698.26 18.10 12104.4697019
1,995.03 199.50 199.50 5.17 3458.41991483
1,995.03 99.75 99.75 2.59 1729.20995742
1,995.03 199.50 199.50 5.17 3458.41991483
40.002.2801
70.61 7.06 7.06 0.44 161.669203504
70.61 14.12 14.12 0.88 323.338407008
70.61 31.77 31.77 1.98 727.511415768
70.61 7.06 7.06 0.44 161.669203504
70.61 3.53 3.53 0.22 80.834601752
70.61 7.06 7.06 0.44 161.669203504
40.002.2802
83.86 8.39 8.39 2.36 513.134808294
83.86 16.77 16.77 4.72 1026.26961659
83.86 37.74 37.74 10.62 2309.10663732
83.86 8.39 8.39 2.36 513.134808294
83.86 4.19 4.19 1.18 256.567404147
83.86 8.39 8.39 2.36 513.134808294
40.002.2805
343.66 34.37 34.37 10.56 2432.60156485
343.66 68.73 68.73 21.12 4865.2031297
343.66 154.65 154.65 47.52 10946.7070418
343.66 34.37 34.37 10.56 2432.60156485
343.66 17.18 17.18 5.28 1216.30078242
343.66 34.37 34.37 10.56 2432.60156485
40.002.2806
239.98 24.00 24.00 10.56 2206.51196812
239.98 48.00 48.00 21.12 4413.02393623
239.98 107.99 107.99 47.52 9929.30385653
239.98 24.00 24.00 10.56 2206.51196812
239.98 12.00 12.00 5.28 1103.25598406
239.98 24.00 24.00 10.56 2206.51196812
40.002.2809
373.26 37.33 37.33 1.68 704.20556802
373.26 74.65 74.65 3.36 1408.41113604
373.26 37.33 37.33 1.68 704.20556802
373.26 130.64 130.64 5.88 2464.71948807
373.26 37.33 37.33 1.68 704.20556802
373.26 18.66 18.66 0.84 352.10278401
373.26 37.33 37.33 1.68 704.20556802
40.002.2826
1,829.01 182.90 182.90 6.88 3378.90574988
1,829.01 365.80 365.80 13.76 6757.81149976
1,829.01 182.90 182.90 6.88 3378.90574988
1,829.01 640.15 640.15 24.08 11826.1701246
1,829.01 182.90 182.90 6.88 3378.90574988
1,829.01 91.45 91.45 3.44 1689.45287494
1,829.01 182.90 182.90 6.88 3378.90574988
40.002.1564
2,409.12 240.91 240.91 13.23 4667.2794
2,409.12 481.82 481.82 26.46 9334.5588
2,409.12 361.37 361.37 19.85 7000.9191
2,409.12 722.74 722.74 39.69 14001.8382
2,409.12 240.91 240.91 13.23 4667.2794
2,409.12 120.46 120.46 6.62 2333.6397
2,409.12 240.91 240.91 13.23 4667.2794
40.002.1565
31.80 3.18 3.18 1.51 287.1288
31.80 6.36 6.36 3.02 574.2576
31.80 3.18 3.18 1.51 287.1288
31.80 11.13 11.13 5.29 1004.9508
31.80 3.18 3.18 1.51 287.1288
31.80 1.59 1.59 0.76 143.5644
31.80 3.18 3.18 1.51 287.1288
60.002.1061
86.45 21.61 21.61 4.82 975.904464436
86.45 25.94 25.94 5.79 1171.08535732
86.45 21.61 21.61 4.82 975.904464436
86.45 8.65 8.65 1.93 390.361785774
86.45 8.65 8.65 1.93 390.361785774

20.001.0003
20,160.00 2,016.00 2,016.00 350.00 31038
20,160.00 14,112.00 14,112.00 2,450.00 217266
20,160.00 4,032.00 4,032.00 700.00 62076
20.001.0005
12,900.00 1,290.00 1,290.00 250.00 20485
12,900.00 9,030.00 9,030.00 1,750.00 143395
12,900.00 2,580.00 2,580.00 500.00 40970
20.001.0006
7,920.00 792.00 792.00 200.00 13300
7,920.00 5,544.00 5,544.00 1,400.00 93100
7,920.00 1,584.00 1,584.00 400.00 26600
20.002.0002
22,320.00 2,232.00 2,232.00 1,200.00 31536
22,320.00 15,624.00 15,624.00 8,400.00 220752
22,320.00 4,464.00 4,464.00 2,400.00 63072
20.002.0003
8,640.00 864.00 864.00 400.00 12172
8,640.00 6,048.00 6,048.00 2,800.00 85204
8,640.00 1,728.00 1,728.00 800.00 24344
20.002.0004
480.00 48.00 48.00 20.00 662.2
480.00 336.00 336.00 140.00 4635.4
480.00 96.00 96.00 40.00 1324.4
20.002.0005
255.00 25.50 25.50 8.50 349.265
255.00 178.50 178.50 59.50 2444.855
255.00 51.00 51.00 17.00 698.53
20.002.0006
324.00 32.40 32.40 9.00 433.17
324.00 226.80 226.80 63.00 3032.19
324.00 64.80 64.80 18.00 866.34
20.002.0007
142.80 14.28 14.28 3.40 189.38
142.80 99.96 99.96 23.80 1325.66
142.80 28.56 28.56 6.80 378.76
20.002.0014
990.00 99.00 99.00 75.00 1781.25
990.00 693.00 693.00 525.00 12468.75
990.00 198.00 198.00 150.00 3562.5
20.002.0043
420.00 42.00 42.00 50.00 540
420.00 294.00 294.00 350.00 3780
420.00 84.00 84.00 100.00 1080
20.002.0057
729.00 72.90 72.90 27.00 910.17
729.00 510.30 510.30 189.00 6371.19
729.00 145.80 145.80 54.00 1820.34
20.002.0058
3,163.68 316.37 316.37 78.00 3942.9
3,163.68 2,214.58 2,214.58 546.00 27600.3
3,163.68 632.74 632.74 156.00 7885.8
30.001.9113
151.20 15.12 15.12 90.00 208.8
151.20 105.84 105.84 630.00 1461.6
151.20 30.24 30.24 180.00 417.6
30.002.1102
363.00 36.30 36.30 55.00 482.9
363.00 254.10 254.10 385.00 3380.3
363.00 72.60 72.60 110.00 965.8
30.002.1103
165.12 16.51 16.51 32.00 220.8
165.12 115.58 115.58 224.00 1545.6
165.12 33.02 33.02 64.00 441.6
30.002.3103
722.40 72.24 72.24 140.00 974.4
722.40 505.68 505.68 980.00 6820.8
722.40 144.48 144.48 280.00 1948.8
30.002.3105
15.60 1.56 1.56 2.00 21.3
15.60 10.92 10.92 14.00 149.1
15.60 3.12 3.12 4.00 42.6
30.002.6102
283.80 28.38 28.38 55.00 383.9
283.80 198.66 198.66 385.00 2687.3
283.80 56.76 56.76 110.00 767.8
30.002.6103
546.00 54.60 54.60 130.00 733.2
546.00 382.20 382.20 910.00 5132.4
546.00 109.20 109.20 260.00 1466.4
30.002.6306
155.40 15.54 15.54 35.00 208.25
155.40 108.78 108.78 245.00 1457.75
155.40 31.08 31.08 70.00 416.5
30.002.6313
302.40 30.24 30.24 180.00 403.2
302.40 211.68 211.68 1,260.00 2822.4
302.40 60.48 60.48 360.00 806.4
30.002.6314
54.60 5.46 5.46 35.00 75.6
54.60 38.22 38.22 245.00 529.2
54.60 10.92 10.92 70.00 151.2
30.002.6315
288.00 28.80 28.80 200.00 402
288.00 201.60 201.60 1,400.00 2814
288.00 57.60 57.60 400.00 804
30.002.6409
592.80 59.28 59.28 190.00 796.1
592.80 414.96 414.96 1,330.00 5572.7
592.80 118.56 118.56 380.00 1592.2
30.002.6410
720.00 72.00 72.00 250.00 962.5
720.00 504.00 504.00 1,750.00 6737.5
720.00 144.00 144.00 500.00 1925
30.002.6411
92.40 9.24 9.24 35.00 124.6
92.40 64.68 64.68 245.00 872.2
92.40 18.48 18.48 70.00 249.2
30.002.6412
336.00 33.60 33.60 140.00 452.2
336.00 235.20 235.20 980.00 3165.4
336.00 67.20 67.20 280.00 904.4
30.002.6414
54.00 5.40 5.40 30.00 73.2
54.00 37.80 37.80 210.00 512.4
54.00 10.80 10.80 60.00 146.4
30.002.6505
273.00 27.30 27.30 35.00 362.95
273.00 191.10 191.10 245.00 2540.65
273.00 54.60 54.60 70.00 725.9
30.002.6507
18.72 1.87 1.87 4.00 24.88
18.72 13.10 13.10 28.00 174.16
18.72 3.74 3.74 8.00 49.76
30.002.6509
17.40 1.74 1.74 5.00 23.15
17.40 12.18 12.18 35.00 162.05
17.40 3.48 3.48 10.00 46.3
30.002.6511
180.00 18.00 18.00 60.00 246.6
180.00 126.00 126.00 420.00 1726.2
180.00 36.00 36.00 120.00 493.2
30.002.6512
400.20 40.02 40.02 145.00 532.15
400.20 280.14 280.14 1,015.00 3725.05
400.20 80.04 80.04 290.00 1064.3
30.002.6513
1,476.00 147.60 147.60 615.00 1968
1,476.00 1,033.20 1,033.20 4,305.00 13776
1,476.00 295.20 295.20 1,230.00 3936
30.002.6514
410.40 41.04 41.04 180.00 550.8
410.40 287.28 287.28 1,260.00 3855.6
410.40 82.08 82.08 360.00 1101.6
30.002.7002
63.00 6.30 6.30 35.00 84.7
63.00 44.10 44.10 245.00 592.9
63.00 12.60 12.60 70.00 169.4
30.002.7011
42.00 4.20 4.20 35.00 56
42.00 29.40 29.40 245.00 392
42.00 8.40 8.40 70.00 112
30.002.7012
312.00 31.20 31.20 130.00 425.1
312.00 218.40 218.40 910.00 2975.7
312.00 62.40 62.40 260.00 850.2
30.002.7014
36.96 3.70 3.70 14.00 49.14
36.96 25.87 25.87 98.00 343.98
36.96 7.39 7.39 28.00 98.28
30.002.7021
1,056.00 105.60 105.60 1,100.00 1452
1,056.00 739.20 739.20 7,700.00 10164
1,056.00 211.20 211.20 2,200.00 2904
30.002.7022
312.00 31.20 31.20 200.00 430
312.00 218.40 218.40 1,400.00 3010
312.00 62.40 62.40 400.00 860
30.002.7221
96.00 9.60 9.60 100.00 131
96.00 67.20 67.20 700.00 917
96.00 19.20 19.20 200.00 262
30.002.7331
9.60 0.96 0.96 4.00 12.88
9.60 6.72 6.72 28.00 90.16
9.60 1.92 1.92 8.00 25.76
30.002.7334
84.00 8.40 8.40 35.00 114.8
84.00 58.80 58.80 245.00 803.6
84.00 16.80 16.80 70.00 229.6
30.002.7338
96.60 9.66 9.66 35.00 132.3
96.60 67.62 67.62 245.00 926.1
96.60 19.32 19.32 70.00 264.6
30.002.8101
300.00 30.00 30.00 100.00 414
300.00 210.00 210.00 700.00 2898
300.00 60.00 60.00 200.00 828
30.002.8102
216.00 21.60 21.60 90.00 298.8
216.00 151.20 151.20 630.00 2091.6
216.00 43.20 43.20 180.00 597.6
30.002.8300
52.80 5.28 5.28 20.00 72
52.80 36.96 36.96 140.00 504
52.80 10.56 10.56 40.00 144
30.002.9113
1,716.00 171.60 171.60 1,300.00 2392
1,716.00 1,201.20 1,201.20 9,100.00 16744
1,716.00 343.20 343.20 2,600.00 4784
30.002.9114
5,940.00 594.00 594.00 4,500.00 8235
5,940.00 4,158.00 4,158.00 31,500.00 57645
5,940.00 1,188.00 1,188.00 9,000.00 16470
40.001.0001
982.80 98.28 98.28 65.00 1374.75
982.80 687.96 687.96 455.00 9623.25
982.80 196.56 196.56 130.00 2749.5
40.001.0002
194.40 19.44 19.44 60.00 268.8
194.40 136.08 136.08 420.00 1881.6
194.40 38.88 38.88 120.00 537.6
40.002.0001
32.40 3.24 3.24 6.00 45.54
32.40 22.68 22.68 42.00 318.78
32.40 6.48 6.48 12.00 91.08
40.002.0002
1,075.20 107.52 107.52 320.00 1507.2
1,075.20 752.64 752.64 2,240.00 10550.4
1,075.20 215.04 215.04 640.00 3014.4
40.002.0003
360.00 36.00 36.00 200.00 498
360.00 252.00 252.00 1,400.00 3486
360.00 72.00 72.00 400.00 996
40.003.0001
9.60 0.96 0.96 0.10 30.194
9.60 6.72 6.72 0.70 211.358
9.60 1.92 1.92 0.20 60.388
40.004.0001
1,008.00 100.80 100.80 1.20 2305.716
1,008.00 705.60 705.60 8.40 16140.012
1,008.00 201.60 201.60 2.40 4611.432
40.005.0001
648.00 64.80 64.80 30.00 1851.3
648.00 453.60 453.60 210.00 12959.1
648.00 129.60 129.60 60.00 3702.6
40.006.0004
168.00 16.80 16.80 0.40 513.648
168.00 117.60 117.60 2.80 3595.536
168.00 33.60 33.60 0.80 1027.296
50.001.1103
72.00 7.20 7.20 0.20 259.8
72.00 36.00 36.00 1.00 1299
72.00 14.40 14.40 0.40 519.6
72.00 14.40 14.40 0.40 519.6
50.001.1122
72.00 7.20 7.20 0.20 259.8
72.00 36.00 36.00 1.00 1299
72.00 14.40 14.40 0.40 519.6
72.00 14.40 14.40 0.40 519.6
50.001.1425
36.00 3.60 3.60 0.10 129.9
36.00 18.00 18.00 0.50 649.5
36.00 7.20 7.20 0.20 259.8
36.00 7.20 7.20 0.20 259.8
50.001.3103
3,600.00 360.00 360.00 10.00 4660
3,600.00 1,800.00 1,800.00 50.00 23300
3,600.00 720.00 720.00 20.00 9320
3,600.00 720.00 720.00 20.00 9320
50.001.3105
60.00 6.00 6.00 0.20 79.85
60.00 30.00 30.00 1.00 399.25
60.00 12.00 12.00 0.40 159.7
60.00 12.00 12.00 0.40 159.7
50.001.6102
33.60 3.36 3.36 1.40 37.394
33.60 16.80 16.80 7.00 186.97
33.60 6.72 6.72 2.80 74.788
33.60 6.72 6.72 2.80 74.788
50.001.6103
207.36 20.74 20.74 9.60 230.784
207.36 103.68 103.68 48.00 1153.92
207.36 41.47 41.47 19.20 461.568
207.36 41.47 41.47 19.20 461.568
50.001.6306
21.60 2.16 2.16 1.50 24.045
21.60 10.80 10.80 7.50 120.225
21.60 4.32 4.32 3.00 48.09
21.60 4.32 4.32 3.00 48.09
50.001.6313
51.60 5.16 5.16 8.60 57.448
51.60 25.80 25.80 43.00 287.24
51.60 10.32 10.32 17.20 114.896
51.60 10.32 10.32 17.20 114.896
50.001.6314
4.80 0.48 0.48 1.00 5.34
4.80 2.40 2.40 5.00 26.7
4.80 0.96 0.96 2.00 10.68
4.80 0.96 0.96 2.00 10.68
50.001.6315
28.80 2.88 2.88 6.00 32.04
28.80 14.40 14.40 30.00 160.2
28.80 5.76 5.76 12.00 64.08
28.80 5.76 5.76 12.00 64.08
50.001.6409
86.40 8.64 8.64 6.00 96.12
86.40 43.20 43.20 30.00 480.6
86.40 17.28 17.28 12.00 192.24
86.40 17.28 17.28 12.00 192.24
50.001.6410
144.00 14.40 14.40 10.00 160.2
144.00 72.00 72.00 50.00 801
144.00 28.80 28.80 20.00 320.4
144.00 28.80 28.80 20.00 320.4
50.001.6411
6.12 0.61 0.61 0.60 6.81
6.12 3.06 3.06 3.00 34.05
6.12 1.22 1.22 1.20 13.62
6.12 1.22 1.22 1.20 13.62
50.001.6412
25.92 2.59 2.59 3.00 28.83
25.92 12.96 12.96 15.00 144.15
25.92 5.18 5.18 6.00 57.66
25.92 5.18 5.18 6.00 57.66
50.001.6414
2.16 0.22 0.22 0.40 2.404
2.16 1.08 1.08 2.00 12.02
2.16 0.43 0.43 0.80 4.808
2.16 0.43 0.43 0.80 4.808
50.001.6505
84.00 8.40 8.40 2.80 93.464
84.00 42.00 42.00 14.00 467.32
84.00 16.80 16.80 5.60 186.928
84.00 16.80 16.80 5.60 186.928
50.001.6507
9.60 0.96 0.96 0.40 10.684
9.60 4.80 4.80 2.00 53.42
9.60 1.92 1.92 0.80 21.368
9.60 1.92 1.92 0.80 21.368
50.001.6509
7.68 0.77 0.77 0.40 8.548
7.68 3.84 3.84 2.00 42.74
7.68 1.54 1.54 0.80 17.096
7.68 1.54 1.54 0.80 17.096
50.001.6511
36.00 3.60 3.60 3.00 40.05
36.00 18.00 18.00 15.00 200.25
36.00 7.20 7.20 6.00 80.1
36.00 7.20 7.20 6.00 80.1
50.001.6512
57.00 5.70 5.70 5.00 63.45
57.00 28.50 28.50 25.00 317.25
57.00 11.40 11.40 10.00 126.9
57.00 11.40 11.40 10.00 126.9
50.001.6513
108.00 10.80 10.80 10.00 120.2
108.00 54.00 54.00 50.00 601
108.00 21.60 21.60 20.00 240.4
108.00 21.60 21.60 20.00 240.4
50.001.6514
76.80 7.68 7.68 8.00 85.44
76.80 38.40 38.40 40.00 427.2
76.80 15.36 15.36 16.00 170.88
76.80 15.36 15.36 16.00 170.88
50.001.7002
9.60 0.96 0.96 1.00 10.68
9.60 4.80 4.80 5.00 53.4
9.60 1.92 1.92 2.00 21.36
9.60 1.92 1.92 2.00 21.36
50.001.7011
4.20 0.42 0.42 1.00 4.67
4.20 2.10 2.10 5.00 23.35
4.20 0.84 0.84 2.00 9.34
4.20 0.84 0.84 2.00 9.34
50.001.7012
28.80 2.88 2.88 3.00 32.04
28.80 14.40 14.40 15.00 160.2
28.80 5.76 5.76 6.00 64.08
28.80 5.76 5.76 6.00 64.08
50.001.7014
18.72 1.87 1.87 1.20 20.832
18.72 9.36 9.36 6.00 104.16
18.72 3.74 3.74 2.40 41.664
18.72 3.74 3.74 2.40 41.664
50.001.7021
72.00 7.20 7.20 20.00 80.2
72.00 36.00 36.00 100.00 401
72.00 14.40 14.40 40.00 160.4
72.00 14.40 14.40 40.00 160.4
50.001.7334
5.76 0.58 0.58 0.60 6.408
5.76 2.88 2.88 3.00 32.04
5.76 1.15 1.15 1.20 12.816
5.76 1.15 1.15 1.20 12.816
50.001.7338
10.80 1.08 1.08 0.60 12.018
10.80 5.40 5.40 3.00 60.09
10.80 2.16 2.16 1.20 24.036
10.80 2.16 2.16 1.20 24.036
50.001.9113
240.00 24.00 24.00 100.00 267
240.00 120.00 120.00 500.00 1335
240.00 48.00 48.00 200.00 534
240.00 48.00 48.00 200.00 534
50.001.9114
480.00 48.00 48.00 200.00 534
480.00 240.00 240.00 1,000.00 2670
480.00 96.00 96.00 400.00 1068
480.00 96.00 96.00 400.00 1068
60.002.0002
92.40 9.24 9.24 1.10 175.978
92.40 64.68 64.68 7.70 1231.846
92.40 18.48 18.48 2.20 351.956
60.002.0004
453.60 45.36 45.36 4.20 1345.428
453.60 317.52 317.52 29.40 9417.996
453.60 90.72 90.72 8.40 2690.856
60.002.0005
252.00 25.20 25.20 4.20 567.588
252.00 176.40 176.40 29.40 3973.116
252.00 50.40 50.40 8.40 1135.176
60.005.0034
4,032.00 403.20 403.20 48.00 7376.16
4,032.00 2,822.40 2,822.40 336.00 51633.12
4,032.00 806.40 806.40 96.00 14752.32
60.005.0073
691.20 69.12 69.12 2.40 1214.28
691.20 483.84 483.84 16.80 8499.96
691.20 138.24 138.24 4.80 2428.56
60.005.0092
126.96 12.70 12.70 2.30 302.266
126.96 88.87 88.87 16.10 2115.862
126.96 25.39 25.39 4.60 604.532
70.001.0005
2,220.00 222.00 222.00 0.10 2931.866
2,220.00 1,332.00 1,332.00 0.60 17591.196
2,220.00 222.00 222.00 0.10 2931.866
2,220.00 444.00 444.00 0.20 5863.732
70.001.0006
180.00 18.00 18.00 0.10 270.405
180.00 108.00 108.00 0.60 1622.43
180.00 18.00 18.00 0.10 270.405
180.00 36.00 36.00 0.20 540.81
70.001.0007
144.00 14.40 14.40 0.10 196.533
144.00 86.40 86.40 0.60 1179.198
144.00 14.40 14.40 0.10 196.533
144.00 28.80 28.80 0.20 393.066
70.004.0002
768.00 76.80 76.80 1.60 1374.112
768.00 460.80 460.80 9.60 8244.672
768.00 76.80 76.80 1.60 1374.112
768.00 153.60 153.60 3.20 2748.224
70.004.0003
48.00 4.80 4.80 0.10 88.061
48.00 28.80 28.80 0.60 528.366
48.00 4.80 4.80 0.10 88.061
48.00 9.60 9.60 0.20 176.122
70.004.0004
48.00 4.80 4.80 0.10 88.061
48.00 28.80 28.80 0.60 528.366
48.00 4.80 4.80 0.10 88.061
48.00 9.60 9.60 0.20 176.122
70.005.0002
384.00 38.40 38.40 0.10 882.326
384.00 230.40 230.40 0.60 5293.956
384.00 38.40 38.40 0.10 882.326
384.00 76.80 76.80 0.20 1764.652
70.006.0004
588.00 58.80 58.80 0.10 1151.116
588.00 352.80 352.80 0.60 6906.696
588.00 58.80 58.80 0.10 1151.116
588.00 117.60 117.60 0.20 2302.232
70.006.0005
144.00 14.40 14.40 0.10 576.901
144.00 86.40 86.40 0.60 3461.406
144.00 14.40 14.40 0.10 576.901
144.00 28.80 28.80 0.20 1153.802
70.007.0001
1,536.00 153.60 153.60 0.40 3529.304
1,536.00 921.60 921.60 2.40 21175.824
1,536.00 153.60 153.60 0.40 3529.304
1,536.00 307.20 307.20 0.80 7058.608
70.008.0101
60.00 6.00 6.00 0.10 86.365
60.00 36.00 36.00 0.60 518.19
60.00 6.00 6.00 0.10 86.365
60.00 12.00 12.00 0.20 172.73
70.009.0002
48.00 4.80 4.80 0.10 69.632
48.00 28.80 28.80 0.60 417.792
48.00 4.80 4.80 0.10 69.632
48.00 9.60 9.60 0.20 139.264
70.014.0002
60.00 6.00 6.00 0.10 447.556
60.00 36.00 36.00 0.60 2685.336
60.00 6.00 6.00 0.10 447.556
60.00 12.00 12.00 0.20 895.112
70.020.0000
4,500.00 4,500.00 4,500.00 1.00 30000
70.030.0000
1,980.00 1,980.00 1,980.00 1.00 15000

20.001.0001
0.00 0.00 0.00 245.31 0
0.00 0.00 0.00 49.06 0
0.00 0.00 0.00 196.25 0
20.001.0002
179.96 89.98 89.98 245.31 1040.12715765
179.96 18.00 18.00 49.06 208.025431531
179.96 71.98 71.98 196.25 832.101726123
20.001.0101
0.00 0.00 0.00 245.31 0
0.00 0.00 0.00 49.06 0
0.00 0.00 0.00 196.25 0
20.001.0102
188.11 94.05 94.05 245.31 1089.18975943
188.11 18.81 18.81 49.06 217.837951886
188.11 75.24 75.24 196.25 871.351807544
20.001.0003
0.00 0.00 0.00 199.79 0
0.00 0.00 0.00 39.96 0
0.00 0.00 0.00 159.83 0
20.001.0004
125.63 62.81 62.81 199.79 729.237176399
125.63 12.56 12.56 39.96 145.84743528
125.63 50.25 50.25 159.83 583.389741119
20.001.0103
0.00 0.00 0.00 199.79 0
0.00 0.00 0.00 39.96 0
0.00 0.00 0.00 159.83 0
20.001.0104
131.34 65.67 65.67 199.79 763.201647629
131.34 13.13 13.13 39.96 152.640329526
131.34 52.54 52.54 159.83 610.561318103
20.001.0008
255.05 127.52 127.52 434.94 1474.44660213
255.05 25.50 25.50 86.99 294.889320427
255.05 102.02 102.02 347.95 1179.55728171
20.001.0108
266.71 133.35 133.35 434.94 1544.03700223
266.71 26.67 26.67 86.99 308.807400447
266.71 106.68 106.68 347.95 1235.22960179
20.001.0012
195.72 97.86 97.86 355.86 1131.63480164
195.72 19.57 19.57 71.17 226.326960328
195.72 78.29 78.29 284.69 905.30784131
20.001.0112
204.62 102.31 102.31 355.86 1185.01380171
204.62 20.46 20.46 71.17 237.002760343
204.62 81.85 81.85 284.69 948.011041372
20.002.0001
0.00 0.00 0.00 2,127.15 0
0.00 0.00 0.00 425.43 0
0.00 0.00 0.00 1,701.72 0
20.002.0002
1,337.55 668.78 668.78 2,127.15 7764.0975
1,337.55 133.76 133.76 425.43 1552.8195
1,337.55 535.02 535.02 1,701.72 6211.278
40.001.0005
4,477.25 1,343.17 1,343.17 18,944.64 35047.5829431
4,477.25 671.59 671.59 9,472.32 17523.7914716
4,477.25 671.59 671.59 9,472.32 17523.7914716
4,477.25 1,790.90 1,790.90 25,259.52 46730.1105908
40.001.0006
1,576.11 472.83 472.83 6,669.00 12337.65
1,576.11 236.42 236.42 3,334.50 6168.825
1,576.11 236.42 236.42 3,334.50 6168.825
1,576.11 630.44 630.44 8,892.00 16450.2
40.001.0009
717.22 215.17 215.17 3,034.80 5614.38020325
717.22 107.58 107.58 1,517.40 2807.19010162
717.22 107.58 107.58 1,517.40 2807.19010162
717.22 286.89 286.89 4,046.40 7485.840271
40.001.0010
1,401.69 420.51 420.51 5,931.00 10972.3500159
1,401.69 210.25 210.25 2,965.50 5486.17500794
1,401.69 210.25 210.25 2,965.50 5486.17500794
1,401.69 560.68 560.68 7,908.00 14629.8000212
40.001.0011
886.19 265.86 265.86 3,749.76 6937.0558374
886.19 132.93 132.93 1,874.88 3468.5279187
886.19 132.93 132.93 1,874.88 3468.5279187
886.19 354.48 354.48 4,999.68 9249.4077832
40.001.0027
592.16 177.65 177.65 2,505.60 4635.36
592.16 88.82 88.82 1,252.80 2317.68
592.16 88.82 88.82 1,252.80 2317.68
592.16 236.86 236.86 3,340.80 6180.48
40.002.2805
1,580.86 158.09 158.09 48.58 11189.9670226
1,580.86 316.17 316.17 97.15 22379.9340451
1,580.86 158.09 158.09 48.58 11189.9670226
1,580.86 553.30 553.30 170.02 39164.884579
1,580.86 158.09 158.09 48.58 11189.9670226
1,580.86 79.04 79.04 24.29 5594.98351128
1,580.86 158.09 158.09 48.58 11189.9670226
40.002.2806
505.18 50.52 50.52 22.23 4644.9585
505.18 101.04 101.04 44.46 9289.917
505.18 50.52 50.52 22.23 4644.9585
505.18 176.81 176.81 77.81 16257.35475
505.18 50.52 50.52 22.23 4644.9585
505.18 25.26 25.26 11.12 2322.47925
505.18 50.52 50.52 22.23 4644.9585
40.002.2809
1,123.78 112.38 112.38 5.06 2120.16193675
1,123.78 224.76 224.76 10.12 4240.3238735
1,123.78 112.38 112.38 5.06 2120.16193675
1,123.78 393.32 393.32 17.70 7420.56677863
1,123.78 112.38 112.38 5.06 2120.16193675
1,123.78 56.19 56.19 2.53 1060.08096838
1,123.78 112.38 112.38 5.06 2120.16193675
40.002.2810
832.52 83.25 83.25 7.91 2308.26612334
832.52 166.50 166.50 15.82 4616.53224668
832.52 83.25 83.25 7.91 2308.26612334
832.52 291.38 291.38 27.68 8078.93143169
832.52 83.25 83.25 7.91 2308.26612334
832.52 41.63 41.63 3.95 1154.13306167
832.52 83.25 83.25 7.91 2308.26612334
40.002.2811
5,324.11 532.41 532.41 15.62 11096.1645399
5,324.11 1,064.82 1,064.82 31.25 22192.3290798
5,324.11 532.41 532.41 15.62 11096.1645399
5,324.11 1,863.44 1,863.44 54.68 38836.5758897
5,324.11 532.41 532.41 15.62 11096.1645399
5,324.11 266.21 266.21 7.81 5548.08226996
5,324.11 532.41 532.41 15.62 11096.1645399
40.002.3527
739.36 73.94 73.94 6.96 2335.0104
739.36 147.87 147.87 13.92 4670.0208
739.36 73.94 73.94 6.96 2335.0104
739.36 258.78 258.78 24.36 8172.5364
739.36 73.94 73.94 6.96 2335.0104
739.36 36.97 36.97 3.48 1167.5052
739.36 73.94 73.94 6.96 2335.0104
60.002.1061
188.95 47.24 47.24 10.55 2132.8317
188.95 56.68 56.68 12.65 2559.39804
188.95 47.24 47.24 10.55 2132.8317
188.95 18.89 18.89 4.22 853.13268
188.95 18.89 18.89 4.22 853.13268

10.001.0003
86.70 8.67 780.30 8.67 8209.0501384
86.70 52.02 4,681.80 52.02 49254.3008304
86.70 26.01 2,340.90 26.01 24627.1504152
10.001.0103
277.10 27.71 1,995.12 27.71 21112.141107
277.10 166.26 11,970.72 166.26 126672.846642
277.10 83.13 5,985.36 83.13 63336.423321
10.001.0203
129.20 12.92 775.20 12.92 8175.77340403
129.20 77.52 4,651.20 77.52 49054.6404242
129.20 38.76 2,325.60 38.76 24527.3202121
10.001.0303
262.65 26.27 1,260.72 26.27 13324.5866162
262.65 157.59 7,564.32 157.59 79947.5196974
262.65 78.80 3,782.16 78.80 39973.7598487
10.001.0403
240.55 24.06 1,010.31 24.06 10675.9724232
240.55 144.33 6,061.86 144.33 64055.8345391
240.55 72.17 3,030.93 72.17 32027.9172696
10.001.0503
96.05 9.61 345.78 9.61 3629.5395359
96.05 57.63 2,074.68 57.63 21777.2372154
96.05 28.82 1,037.34 28.82 10888.6186077
10.005.0003
42.00 33.60 100.80 33.60 1052.94525
42.00 8.40 25.20 8.40 263.236312499
10.006.0003
2.10 1.68 161.28 1.68 1686.19077859
2.10 0.42 40.32 0.42 421.547694649
10.009.0003
0.90 0.72 56.16 0.72 587.252477958
0.90 0.18 14.04 0.18 146.81311949
10.009.0103
0.90 0.72 43.20 0.72 451.732675352
0.90 0.18 10.80 0.18 112.933168838
10.009.0203
0.90 0.72 34.56 0.72 360.689633842
0.90 0.18 8.64 0.18 90.1724084604

10.001.2001
10.001.20010 0.00 0.00 0.00 0
10.001.20010 0.00 0.00 0.00 0
10.001.20010 0.00 0.00 0.00 0
10.002.2001
300010003D0 0.00 0.00 0.00 0
300010003D0 0.00 0.00 0.00 0
300010003D0 0.00 0.00 0.00 0

30.001.5016
0.00 0.00 0.00 0.03 104.9952
0.00 0.00 0.00 0.12 419.9808
0.00 0.00 0.00 0.06 209.9904
0.00 0.00 0.00 0.06 209.9904
0.00 0.00 0.00 0.03 104.9952
30.001.5017
0.00 0.00 0.00 0.03 104.9952
0.00 0.00 0.00 0.12 419.9808
0.00 0.00 0.00 0.06 209.9904
0.00 0.00 0.00 0.06 209.9904
0.00 0.00 0.00 0.03 104.9952
30.001.5018
0.00 0.00 0.00 0.03 104.9952
0.00 0.00 0.00 0.12 419.9808
0.00 0.00 0.00 0.06 209.9904
0.00 0.00 0.00 0.06 209.9904
0.00 0.00 0.00 0.03 104.9952
60.001.1707
198.00 19.80 19.80 0.03 157.4928
198.00 118.80 118.80 0.18 944.9568
198.00 39.60 39.60 0.06 314.9856
198.00 19.80 19.80 0.03 157.4928
60.001.1708
60.00 6.00 6.00 0.03 47.7252
60.00 36.00 36.00 0.18 286.3512
60.00 12.00 12.00 0.06 95.4504
60.00 6.00 6.00 0.03 47.7252
70.001.2630
1,152.00 115.20 115.20 1,200.00 5604
1,152.00 691.20 691.20 7,200.00 33624
1,152.00 230.40 230.40 2,400.00 11208
1,152.00 115.20 115.20 1,200.00 5604
70.001.2631
0.00 0.00 0.00 847.00 3955.49
0.00 0.00 0.00 5,082.00 23732.94
0.00 0.00 0.00 1,694.00 7910.98
0.00 0.00 0.00 847.00 3955.49
70.001.3801
0.00 0.00 0.00 0.03 106.6959
0.00 0.00 0.00 0.18 640.1754
0.00 0.00 0.00 0.06 213.3918
0.00 0.00 0.00 0.03 106.6959
70.001.3802
0.00 0.00 0.00 0.03 85.3566
0.00 0.00 0.00 0.18 512.1396
0.00 0.00 0.00 0.06 170.7132
0.00 0.00 0.00 0.03 85.3566
70.001.3803
0.00 0.00 0.00 0.03 143.1753
0.00 0.00 0.00 0.18 859.0518
0.00 0.00 0.00 0.06 286.3506
0.00 0.00 0.00 0.03 143.1753
70.001.3804
0.00 0.00 0.00 0.03 114.5403
0.00 0.00 0.00 0.18 687.2418
0.00 0.00 0.00 0.06 229.0806
0.00 0.00 0.00 0.03 114.5403
80.001.218
9,247.26 924.73 924.73 0.03 6
9,247.26 1,849.45 1,849.45 0.06 12
9,247.26 2,774.18 2,774.18 0.09 18
9,247.26 924.73 924.73 0.03 6
9,247.26 1,849.45 1,849.45 0.06 12
9,247.26 924.73 924.73 0.03 6
10.003.3002
86,203.84 8,620.38 8,620.38 3.10 620
86,203.84 51,722.30 51,722.30 18.60 3720
86,203.84 17,240.77 17,240.77 6.20 1240
86,203.84 8,620.38 8,620.38 3.10 620
80.001.249
2,780.77 278.08 278.08 0.10 20
2,780.77 556.15 556.15 0.20 40
2,780.77 834.23 834.23 0.30 60
2,780.77 278.08 278.08 0.10 20
2,780.77 556.15 556.15 0.20 40
2,780.77 278.08 278.08 0.10 20
80.001.250
2,780.77 278.08 278.08 0.10 20
2,780.77 556.15 556.15 0.20 40
2,780.77 834.23 834.23 0.30 60
2,780.77 278.08 278.08 0.10 20
2,780.77 556.15 556.15 0.20 40
2,780.77 278.08 278.08 0.10 20
80.001.251
2,780.77 278.08 278.08 0.10 20
2,780.77 556.15 556.15 0.20 40
2,780.77 834.23 834.23 0.30 60
2,780.77 278.08 278.08 0.10 20
2,780.77 556.15 556.15 0.20 40
2,780.77 278.08 278.08 0.10 20
80.001.252
0.00 0.00 0.00 0.20 40
0.00 0.00 0.00 0.40 80
0.00 0.00 0.00 0.60 120
0.00 0.00 0.00 0.20 40
0.00 0.00 0.00 0.40 80
0.00 0.00 0.00 0.20 40
80.001.253
21,564.29 2,156.43 2,156.43 81.10 16220
21,564.29 4,312.86 4,312.86 162.20 32440
21,564.29 6,469.29 6,469.29 243.30 48660
21,564.29 2,156.43 2,156.43 81.10 16220
21,564.29 4,312.86 4,312.86 162.20 32440
21,564.29 2,156.43 2,156.43 81.10 16220
80.001.254
529.68 52.97 52.97 0.10 20
529.68 105.94 105.94 0.20 40
529.68 158.90 158.90 0.30 60
529.68 52.97 52.97 0.10 20
529.68 105.94 105.94 0.20 40
529.68 52.97 52.97 0.10 20
80.001.255
0.00 0.00 0.00 0.10 20
0.00 0.00 0.00 0.20 40
0.00 0.00 0.00 0.30 60
0.00 0.00 0.00 0.10 20
0.00 0.00 0.00 0.20 40
0.00 0.00 0.00 0.10 20
80.001.256
1,820.00 182.00 182.00 0.10 20
1,820.00 364.00 364.00 0.20 40
1,820.00 546.00 546.00 0.30 60
1,820.00 182.00 182.00 0.10 20
1,820.00 364.00 364.00 0.20 40
1,820.00 182.00 182.00 0.10 20
80.001.257
2,760.00 276.00 276.00 0.10 20
2,760.00 552.00 552.00 0.20 40
2,760.00 828.00 828.00 0.30 60
2,760.00 276.00 276.00 0.10 20
2,760.00 552.00 552.00 0.20 40
2,760.00 276.00 276.00 0.10 20
80.001.258
7,680.00 768.00 768.00 0.03 6
7,680.00 1,536.00 1,536.00 0.06 12
7,680.00 2,304.00 2,304.00 0.09 18
7,680.00 768.00 768.00 0.03 6
7,680.00 1,536.00 1,536.00 0.06 12
7,680.00 768.00 768.00 0.03 6
80.001.259
7,680.00 768.00 768.00 0.03 6
7,680.00 1,536.00 1,536.00 0.06 12
7,680.00 2,304.00 2,304.00 0.09 18
7,680.00 768.00 768.00 0.03 6
7,680.00 1,536.00 1,536.00 0.06 12
7,680.00 768.00 768.00 0.03 6
80.001.260
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
80.001.261
768.00 76.80 76.80 0.10 20
768.00 153.60 153.60 0.20 40
768.00 230.40 230.40 0.30 60
768.00 76.80 76.80 0.10 20
768.00 153.60 153.60 0.20 40
768.00 76.80 76.80 0.10 20
80.001.262
960.00 96.00 96.00 0.10 20
960.00 192.00 192.00 0.20 40
960.00 288.00 288.00 0.30 60
960.00 96.00 96.00 0.10 20
960.00 192.00 192.00 0.20 40
960.00 96.00 96.00 0.10 20
80.001.263
472.80 47.28 47.28 0.03 6
472.80 94.56 94.56 0.06 12
472.80 141.84 141.84 0.09 18
472.80 47.28 47.28 0.03 6
472.80 94.56 94.56 0.06 12
472.80 47.28 47.28 0.03 6
80.001.264
36.00 3.60 3.60 0.03 6
36.00 7.20 7.20 0.06 12
36.00 10.80 10.80 0.09 18
36.00 3.60 3.60 0.03 6
36.00 7.20 7.20 0.06 12
36.00 3.60 3.60 0.03 6
80.001.265
472.80 47.28 47.28 0.03 6
472.80 94.56 94.56 0.06 12
472.80 141.84 141.84 0.09 18
472.80 47.28 47.28 0.03 6
472.80 94.56 94.56 0.06 12
472.80 47.28 47.28 0.03 6
80.001.266
36.00 3.60 3.60 0.03 6
36.00 7.20 7.20 0.06 12
36.00 10.80 10.80 0.09 18
36.00 3.60 3.60 0.03 6
36.00 7.20 7.20 0.06 12
36.00 3.60 3.60 0.03 6
80.001.267
472.80 47.28 47.28 0.03 6
472.80 94.56 94.56 0.06 12
472.80 141.84 141.84 0.09 18
472.80 47.28 47.28 0.03 6
472.80 94.56 94.56 0.06 12
472.80 47.28 47.28 0.03 6
80.001.268
36.00 3.60 3.60 0.10 20
36.00 7.20 7.20 0.20 40
36.00 10.80 10.80 0.30 60
36.00 3.60 3.60 0.10 20
36.00 7.20 7.20 0.20 40
36.00 3.60 3.60 0.10 20
80.001.269
600.00 60.00 60.00 0.10 20
600.00 120.00 120.00 0.20 40
600.00 180.00 180.00 0.30 60
600.00 60.00 60.00 0.10 20
600.00 120.00 120.00 0.20 40
600.00 60.00 60.00 0.10 20
80.001.270
54.00 5.40 5.40 0.03 6

También podría gustarte