COSTO TOTAL
COSTO DE INVERSION U.M Metas
PRIVADO
Suficiente y adecuada infraestructura educativa 3,345,868.77
OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES Glb 1.00 253,970.05
HORIZ
Costo Mensuales COSTO ANUAL COSTO ANUAL
F.C Año 0 Año 1
(S/.) PRIVADO SOCIAL
112,620.00 112,610.82 112,620 112,620 112,620 112,620
112,560.00 112,560.00 112,560.00 112,560.00 112,560.00 112,560.00
2680 32,160.00 1.000 32,160.00 32,160 32,160 32,160 32,160
2680 80,400.00 1.000 80,400.00 80,400 80,400 80,400 80,400
60.00 50.82 60 60 60 60
5 60.00 0.847 50.82 60 60 60 60
7,200.00 6,098.40 7,200 7,200 7,200 7,200
4826 4,826.00 0.847 4,087.62 4,826 4,826 4,826 4,826
975 975.00 0.847 825.83 975 975 975 975
1399 1,399.00 0.847 1,184.95 1,399 1,399 1,399 1,399
ENTO S/. 119,820.00 S/. 118,709.22 119,820 119,820 119,820 119,820
OS - SIN PROYECTO
HORIZ
Costo Mensuales COSTO ANUAL COSTO ANUAL
F.C Año 0 Año 1
(S/.) PRIVADO SOCIAL
112,980.00 112,915.74 112,980 112,980 112,980 112,980
112,560.00 112,560.00 112,560.00 112,560.00 112,560.00 112,560.00
2680 32,160.00 1.000 32,160.00 32,160 32,160 32,160 32,160
2680 80,400.00 1.000 80,400.00 80,400 80,400 80,400 80,400
420.00 355.74 420 420 420 420
10 120.00 0.847 101.64 120 120 120 120
25 300.00 0.847 254.10 300 300 300 300
8,000.00 6,776.00 8,000.00 8,000.00 8,000.00 8,000.00
5000 5,000.00 0.847 4,235.00 5,000 5,000 5,000 5,000
1150 1,150.00 0.847 974.05 1,150 1,150 1,150 1,150
1850 1,850.00 0.847 1,566.95 1,850 1,850 1,850 1,850
ENTO S/. 120,980.00 S/. 119,691.74 120,980 120,980 120,980 120,980
OS - SIN PROYECTO
AÑO 0 HORI
Rubro
2023-2024 2025 2026 2027
I.-FASE DE INVERSION
Expediente Técnico 100,000.00
a) Costo Directo (C.D.) 3,431,846.76
Suficiente y adecuada infraestructura educativa 3,345,868.77
HORIZONTE DE EVALUACIÓN
2028 2029 2030 2031 2032 2033 2034
AÑO 0 HORIZONTE DE
Rubro
2023-2024 2025 2026 2027 2028
I.-FASE DE INVERSION
Expediente Técnico 79,000.00
a) Costo Directo (C.D.) 2,585,389.63
Suficiente y adecuada infraestructura educativa 2,511,844.06
3,273,967.381
ES- ALTERNATIVA UNICA
HORIZONTE DE EVALUACIÓN
2029 2030 2031 2032 2033 2034
ESTUDIANTES MATRICULADOS
2025 2026 2027 2028 2029 2030
I.E. N° 38669 Ccatu Pata 46 54 55 57 58 59
FLUJO DE MATRICULADOS CON PROYECTO 46 54 55 57 58 59
Fuente: Elaboracion del proyectista.
TO
Total de estudiantes
2031 2032 2033 2034 atendidos que mejoran el
59 59 60 61 nivel de aprendizajes
59 59 60 61 568
N PROYECTO
625
Precio Social
1,004.91
1,794.49
3,301.86
1,076.70
1,794.49
2,153.39
1,435.60
12,561.43
EVALUACION ECONOMICA A PRECIOS
Evaluación económica a precio Privados de la alternat
HORIZONTE DE
DESCRIPCION 2023-2024 2025 2026 2027
0 1 2 3
COSTOS INCREMENTALES 4,954,538.74 1,160 1,160 1,160
VALOR ACTUAL DE COSTOS INCREME 4,954,539 1,074 995 921
Factor de Actual. 1.00 0.93 0.86 0.79
VALOR ACTUAL DE LOS COSTOS VAC = 4,979,285.21
Tasa de descuento = 8% = 8.0%
CANTIDAD DE NIÑOS ATENDIDOS
NIÑOS
QUE LOGRAN CAMBIOS = 568
ATENDIDOS
SIGNIFICATIVOS
VACS/
RATIO COSTO/EFECTIVIDAD CE = 8,766.35
ATENDIDOS
HORIZONTE DE
DESCRIPCION 2023-2024 2025 2026 2027
0 1 2 3
COSTOS INCREMENTALES 3,253,007 983 983 983
VALOR ACTUAL DE COSTOS INCREME 3,253,007 910 842 780
Factor de Actual. 1.00 0.93 0.86 0.79
VALOR ACTUAL DE LOS COSTOS VACS = 3,273,967.38
Tasa de descuento = 8% = 8.0%
CANTIDAD DE NIÑOS ATENDIDOS
NIÑOS
QUE LOGRAN CAMBIOS = 568
ATENDIDOS
SIGNIFICATIVOS
VACS/
RATIO COSTO/EFECTIVIDAD CE = 5,764.03
ATENDIDOS
OMICA A PRECIOS DE MERCADO
a a precio Privados de la alternativa Unica
VARIACIÓN DE LA INVERSIÓN
ALTERNATIVAS INVERSIÓN INDICADOR
-40% -20% -10% -5% 0% 5% 10% 20% 30% 40%
VAN 2,997,469.7 3,988,377.5 4,483,831.3 4,731,558.3 4,979,285.2 5,227,012.1 5,474,739.1 5,970,193.0 6,465,646.8 6,961,100.7
ALTERNATIVA UNICA 4,954,538.74
C/E 5,259.81 7,013.08 7,889.71 8,328.03 8,766.3 9,204.66 9,642.98 10,519.62 11,396.25 12,272.89
VAN 1,972,764.5 2,623,366.0 2,948,666.7 3,111,317.0 3,273,967.4 3,111,317.0 2,948,666.7 2,623,366.0 2,298,065.2 1,972,764.5
ALTERNATIVA UNICA 3,253,007.12
C/E 3,458.42 4,611.22 5,187.62 5,475.83 5,764.0 6,052.23 6,340.43 6,916.83 7,493.24 8,069.64
INVERSIÓN
VARIACIÓN DE
LA INVERSIÓN
VAN C/E SENSIBILIDAD DEL VAN ANTE VARIACIONES DE
-40% 2,997,469.72 5259.808
LA INVERSIÓN
8,000,000.00
-30% 3,492,923.59 6136.443
7,000,000.00
-20% 3,988,377.46 7013.078
6,000,000.00
-10% 4,483,831.34 7889.712
5,000,000.00
-5% 4,731,558.27 8328.030 ALTERNATIVA UNICA
VAN
4,000,000.00
4,954,538.74 0% 4,979,285.21 8766.347
3,000,000.00
5% 5,227,012.15 9204.665 2,000,000.00
10% 5,474,739.09 9642.982 1,000,000.00
20% 5,970,192.96 10519.617 0.00
-50% -40% -30% -20% -10% 0% 10% 20% 30% 40% 50%
30% 6,465,646.83 11396.251
VARIACIÓN PORCENTAL
40% 6,961,100.71 12272.886
INVERSIÓN
VARIACIÓN DE
LA INVERSIÓN
VAN C/E SENSIBILIZACIÓN DEL VAN ANTE VARIACIÓN DE
-40% 1,972,764.53 3458.42 PRECIO DEL PRODUCTO
-30% 3,111,317.03 4034.82 9000.00
8000.00
-20% 2,623,365.96 4611.22
7000.00
-10% 2,948,666.67 5187.62 6000.00
Ratio C/E
CONSTRUCCION DEL MODULO III (01 SUM DE 89.90 M2, 01 BIBLIOTECA DE 40.00 M2,
DEPOSITO SUM - TALLERCREATIVO - IMPLEMENTOS DEPORTIVOS DE 47.53 M2) 853,541.91 0.00 85,354.19 170,708.38 256,062.57
CONSTRUCCION DEL MODULO IV (01 COCINA DE 10.00 M2, 01 ALMACEN DE
ALIMENTOS 4.20 M2 Y 01 DEPOSITO DE COMBUSTIBLES DE 3.00 M2) 208,823.86 0.00 20,882.39 41,764.77 62,647.16
CONSTRUCCION DEL MODULO V (SS.HH. NIÑOS DE 3.50 M2, SS.HH. NIÑAS DE 2.76
M2, SS.HH. DISCAPACITADOS DE 4.60 M2, SS.HH. DOCENTES DE 3.50 M2 Y CUARTO DE
LIMPIEZA DE 1.50 M2) 270,967.96 0.00 27,096.80 54,193.59 81,290.39
CONSTRUCCION DEL MODULO VI (02 AULAS DE 60 M2 C/U) 588,861.74 0.00 58,886.17 117,772.35 176,658.52
CERCO PERIMETRICO 337,092.17 0.00 0.00 67,418.43 134,836.87
LOSA MULTIUSO 126,326.53 0.00 0.00 0.00 37,897.96
COBERTURA METALICA EN LOSA MULTIUSO 291,554.01 0.00 0.00 0.00 87,466.20
MUROS DE CONTENCION 296,005.52 0.00 0.00 59,201.10 88,801.66
OBRAS DE CIRCULACION (VEREDAS EXTERIORES) 73,665.61 0.00 0.00 0.00 0.00
ASTA DE BANDERA 5,271.37 0.00 0.00 0.00 0.00
SUMINISTRO E INSTALACIÓN DE BIODIGESTOR DE 3,000 LITROS 22,545.43 0.00 0.00 0.00 0.00
CONSTRUCCIÓN DE POZO PERCOLADOR 9,662.46 0.00 0.00 0.00 0.00
CISTERNA Y TANQUE ELEVADO 84,808.94 0.00 0.00 0.00 25,442.68
PORTADA DE INGRESO 29,313.71 0.00 0.00 0.00 0.00
BANCAS EXTERIORES 5,309.59 0.00 0.00 0.00 0.00
INSTALACIONES SANITARIAS GENERALES 57,694.54 0.00 0.00 0.00 0.00
INSTALACIONES ELECTRICAS GENERALES 60,024.50 0.00 0.00 0.00 0.00
PLAN DE GESTION DE RIESGOS 4,798.11 0.00 0.00 0.00 0.00
PLAN DE GESTION AMBIENTAL 6,854.44 685.44 1,028.17 1,028.17 1,028.17
Suficiente y adecuado mobiliario y equipamiento educativo. 117,866.28 0.00 0.00 0.00
Mobiliario del nivel primaria 97,535.31 0.00 0.00 0.00
Equipamiento del nivel primaria 20,330.97 0.00 0.00 0.00
COSTO DIRECTO 4,704,680.96 126,054.67 443,986.17 888,194.48 1,202,870.63
SUPERVISIÓN 149,857.78 8,991.47 17,982.93 29,971.56 35,965.87
COSTO TOTAL DE INVERSION 4,954,538.74 50,000.00 50,000.00 135,046.14 461,969.10 918,166.04 1,238,836.50
€ 4,830,675.49
CONSTRUCCION DEL MODULO III (01 SUM DE 89.90 M2, 01 BIBLIOTECA DE 40.00 M2, 10% 20% 30%
DEPOSITO SUM - TALLERCREATIVO - IMPLEMENTOS DEPORTIVOS DE 47.53 M2) 853,541.91
CONSTRUCCION DEL MODULO IV (01 COCINA DE 10.00 M2, 01 ALMACEN DE
10% 20% 30%
ALIMENTOS 4.20 M2 Y 01 DEPOSITO DE COMBUSTIBLES DE 3.00 M2) 208,823.86
CONSTRUCCION DEL MODULO V (SS.HH. NIÑOS DE 3.50 M2, SS.HH. NIÑAS DE 2.76
M2, SS.HH. DISCAPACITADOS DE 4.60 M2, SS.HH. DOCENTES DE 3.50 M2 Y CUARTO DE 10% 20% 30%
LIMPIEZA DE 1.50 M2) 270,967.96
CONSTRUCCION DEL MODULO VI (02 AULAS DE 60 M2 C/U) 588,861.74 10% 20% 30%
CERCO PERIMETRICO 337,092.17 20% 40%
LOSA MULTIUSO 126,326.53 30%
COBERTURA METALICA EN LOSA MULTIUSO 291,554.01 30%
MUROS DE CONTENCION 296,005.52 20% 30%
OBRAS DE CIRCULACION (VEREDAS EXTERIORES) 73,665.61
ASTA DE BANDERA 5,271.37
SUMINISTRO E INSTALACIÓN DE BIODIGESTOR DE 3,000 LITROS 22,545.43
CONSTRUCCIÓN DE POZO PERCOLADOR 9,662.46
CISTERNA Y TANQUE ELEVADO 84,808.94 30%
PORTADA DE INGRESO 29,313.71
BANCAS EXTERIORES 5,309.59
INSTALACIONES SANITARIAS GENERALES 57,694.54
INSTALACIONES ELECTRICAS GENERALES 60,024.50
PLAN DE GESTION DE RIESGOS 4,798.11
PLAN DE GESTION AMBIENTAL 6,854.44 10% 15% 15% 15%
Suficiente y adecuado mobiliario y equipamiento educativo. 117,866.28
Mobiliario del nivel primaria 97,535.31
Equipamiento del nivel primaria 20,330.97
COSTO DIRECTO 4,704,680.96
SUPERVISIÓN 149,857.78 6% 12% 20% 24%
COSTO TOTAL DE INVERSION 4,954,538.74
INANCIERO DE LA ALTERNATIVA UNICO
TIEMPO DE EJECUCION
20%
20%
20%
20% 20%
20% 20%
20% 20%
20% 20%
20% 20%
40% 30%
30% 20% 20%
30% 20%
50% 50%
100%
100%
100%
40% 30%
50% 50%
100%
50% 50%
50% 50%
50% 50%
15% 15% 15%
22% 11% 5%
INVERSION ALTERNATIVA SELECCIONADA
585557.699799619 Expediente Técnico 100,000.00
a) Costo Directo (C.D.) 3,431,846.76
Infraestructura
97.49% Suficiente y adecuada infraestructura educativa 3,345,868.77
7.40% OBRAS PROVISIONALES Y TRABAJOS PRELIMINARE 253,970.05
CONSTRUCCION DEL MODULO I (01 GESTION ADM. Y PEDAGOGICO DE 10.70 M2, ALMACEN
6.73% 230,993.03
15.10 M2)
12.52% CONSTRUCCION DEL MODULO II (02 AULAS DE 60 M2 429,547.35
18.14% CONSTRUCCION DEL MODULO III (01 SUM DE 89.90 622,619.27
4.44% CONSTRUCCION DEL MODULO IV (01 COCINA DE 10. 152,327.33
5.76% CONSTRUCCION DEL MODULO V (SS.HH. NIÑOS DE 3.5 197,658.57
12.52% CONSTRUCCION DEL MODULO VI (02 AULAS DE 60 M 429,547.35
7.17% CERCO PERIMETRICO 245,893.12
2.69% LOSA MULTIUSO 92,149.35
6.20% COBERTURA METALICA EN LOSA MULTIUSO 212,675.14
6.29% MUROS DE CONTENCION 215,922.31
1.57% OBRAS DE CIRCULACION (VEREDAS EXTERIORES) 53,735.65
0.11% ASTA DE BANDERA 3,845.22
0.48% SUMINISTRO E INSTALACIÓN DE BIODIGESTOR DE 3 16,445.85
0.21% CONSTRUCCIÓN DE POZO PERCOLADOR 7,048.32
1.80% CISTERNA Y TANQUE ELEVADO 61,864.19
0.62% PORTADA DE INGRESO 21,382.99
0.11% BANCAS EXTERIORES 3,873.10
1.23% INSTALACIONES SANITARIAS GENERALES 42,085.49
1.28% INSTALACIONES ELECTRICAS GENERALES 43,785.09
0.10% PLAN DE GESTION DE RIESGOS 3,500.00
0.15% PLAN DE GESTION AMBIENTAL 5,000.00
85,977.99 Suficiente y adecuado mobiliario y equipamiento educativo. 85,977.99
Mobiliario del nivel primaria 71,147.49
Equipamiento del nivel primaria 14,830.50
COSTO DIRECTO 3,431,846.76
Gastos Generales (9.18% CD) 314,941.73
Utilidad (7% CD) 240,229.27
Impuesto General a las Ventas IGV (18%) 717,663.20
Gastos de Supervisión 149,857.78
TOTAL 4,954,538.74
4954538.7368
302,696.96
7892.779482
0.09
GG+IGV UTL+IGV IGV CD CD+IGV+UTL
337092.17
417880.54 417880.54
296005.52
73665.61
5271.37
22545.43
9662.46
84808.94
29313.71
5309.59
57694.54
60024.50