ALTERNATIVA 02 21000
CENTROS POBALDOS DE PACCHO MOLINOS, SANTA CRUZ DE 1,024,792.24
PACCHO Y EL ANEXO DE CHILHUAPAMPA
RECURSOS PRECIO TOTAL S/.
Mano de Obra Calificada 7,450.68
Mano de Obra No Calificada 947,326.67
Equipos y Herramientas 524,835.96
Insumos 1741121.4
Sub Contratos 67,700.00 1740561.01
COSTO DIRECTO 3,288,434.71 0.00 1,740,561.01
3288434.71
ALTERNATIVA 01
IE HUAYLACUCHO
RECURSOS PRECIO TOTAL S/.
Mano de Obra Calificada 100,090.96
Insumos 353,313.89
COSTO DIRECTO 541,543.70
I. TANGIBLES 1,714,619.34
1.1. MEJORAMIENTO DEL SERVICIO EDUCATIVO NIVEL
PRIMARIO DE N° 36292 CCOSNIPUQUIO DEL DISTRITO DE
1,714,619.34
ACORIA, PROVINCIA Y DEPARTAMENTO DE
HUANCAVELICA.
1.1.1. Mano de Obra Calificada 316,766.15
1.1.2. Mano de Obra No Calificada 333,084.15
1.1.3. Equipos y Herramientas 60,976.80
1.1.4. Insumos 1,003,792.24
I. TANGIBLES 3,288,434.71
1.1. CONSTRUCCION Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y
3,288,434.71
SISTEMA DE DESAGÜE.
1.1.1. Mano de Obra Calificada 7,450.68
1.1.2. Mano de Obra No Calificada 947,326.67
1.1.3. Equipos y Herramientas 524,835.96
1.1.4. Insumos 1,741,121.40
1.1.5. Sub Contratos 67,700.00
I. TANGIBLES 1,714,619.34
MEJORAMIENTO DEL SERVICIO EDUCATIVO NIVEL
PRIMARIO DE N° 36292 CCOSNIPUQUIO DEL DISTRITO DE
ACORIA, PROVINCIA Y DEPARTAMENTO DE
HUANCAVELICA.
1. ESTRUCTURAS 848,311.08
1.1 OBRAS EXTERIORES 132,755.12
1.2 MODULO 01: AULAS 219,880.61
1.3 MODULO 02: AMBIENTES ADMINISTRATIVOS 119,277.37
1.4 MODULO 03: ADMINISTRATIVO - SUM 120,601.35
1.5 MODULO 04: SERVICIOS HIGENICOS 36,161.29
1.6 CERCO PERIMETRICO 163,642.56
1.7 TANQUE CISTERNA Y TANQUE ELEVADO 21,423.00
1.8 LOSA DEPORTIVA 34,569.78
2 ARQUITECTURA 558,247.72
2.1 OBRAS EXTERIORES 28,188.73
2.2 MODULO 01: AULAS 177,579.49
2.3 MODULO 02: AMBIENTE - ADMINISTRATIVO 112,423.64
2.4 MODULO 03: ADMINISTRATIVO-SUM 114,527.28
2.5 MODULO 04: SERVICIOS HIGENICOS 55,032.52
2.6 CERCO PERIMETRICO 46,260.71
2.7 TANQUE CISTERNA Y TANQUE ELEVADO 6,127.74
2.8 LOSA DEPORTIVA 18,107.61
3 INSTALACIONES ELECTRICAS 105,078.10
3.1 OBRAS EXTERIORES 30,912.36
3.2 MODULO 01: AULAS 23,888.74
3.3 MODULO 02: SISTEMA - ADMINISTRATIVO 18,504.04
3.4 MODULO 03: ADMINISTRATIVO-SUM 23,888.74
3.5 MODULO 04: SERVICIOS HIGENICOS 3,593.14
3.6 TANQUE CISTERNA Y TANQUE ELEVADO 4,291.08
4 INSTALACIONES SANITARIAS 41,009.53
4.1 OBRAS EXTERIORES 16,372.63
4.2 MODULO 01: AULAS 2,713.77
4.3 MODULO 02: SISTEMA - ADMINISTRATIVO 1,798.86
4.4 MODULO 03: ADMINISTRATIVO-SUM 2,741.71
4.5 MODULO 04: SERVICIOS HIGENICOS 14,076.81
4.6 TANQUE CISTERNA Y TANQUE ELEVADO 3,305.75
5 EQUIPAMIENTO 161,972.91
5 I. EQUIPAMIENTO CON MOBILIARIOS 50,673.15
5 2. EQUIPAMIENTO CON EQUIPO 105,932.42
5 3. IMPLEMENTACION DE MATERIALES EDUCATIVOS 847.45
5 4. IMPLEMENTACION DE EQUIPAMIENTO COMPLEMENTARI 2,542.35
5 5. IMPLEMENTACION DE MATERIALES DE SEÑALIZACION Y 1,977.54
COSTO DIRECTO TOTAL 1,714,619.34
GASTO GENERALES (10%) 171,461.93
UTILIDADES (8%) 137,169.55
SUB TOTAL 2,023,250.82
IGV (18%) 364,185.15
COSTO TOTAL DE LA OBRA 2,387,435.97
EXPEDIENTE TÉCNICO (5%) 119,371.80
SUPERVISIÓN (5%) 119,371.80
INVERSIÓN TOTAL S/. 2,626,179.57
I. TANGIBLES 3,289,410.79
1. CONSTRUCCION Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y
SISTEMA DE DESAGÜE
1.1 SISTEMA DE AGUA POTABLE 750,469.30
1.1.1 CONSTRUCCIONES PRELIMINARES 4,791.03
1.1.2 CAPTACION TIPO LADERA 51,941.58
1.1.3 LINEA DE CONDUCCION 86,701.69
1.1.4 CAMARA DE REUNION 3,929.81
1.1.5 CAMARA ROMPE PRESION 30,173.84
1.1.6 PASE AERIO 21,663.87
1.1.7 RESERVORIO 84,919.97
1.1.8 CLORADOR POR GOTEO 8,034.85
1.1.9 RED DE DISTRIBUCION 366,121.76
1.1.10 VALVULA DE PURGA 9,200.55
1.1.11 VALVULA DE AIRE 523.83
1.1.12 CONEXIONES DOMICILIARIAS 77,896.52
1.2 SISTEMA DE ALCANTARILLADO 1,303,170.29
1.2.1 COLECTORES 875,025.54
1.2.2 RED EMISORA 4,625.62
1.2.3 BUZONES DE CONCRETO 273,206.57
1.2.4 PASE AERIO 54,957.56
1.2.5 CONEXIONES DOMICILIARIAS 95,359.00
1.3 PLANTA DE TRATAMIENTO 02 UND 1,153,168.45
1.3.1 COMPONENTES DE PETAR 1,119,563.43
1.3.2 SISTEMA DE DRENAJE 18,908.02
1.3.3 REFORESTACION PARA ESTABILIDAD DE TALUD 14,697.00
1.4 CAPACITACION 21,202.75
1.4.1 CAPACITACION EN EDUCACION SANITARIA, PROMOCION DE LA
21202,75
SALUD Y AOM
1.5 MITIGACION DE IMPACTO AMBIENTAL 12,050.00
1.5 I. MITIGACION DE IMPACTO AMBIENTAL 12,050.00
1.6 OTROS 49,350.00
1.6.1 FLETE 45,550.00
1.6.1 MOBILIZACION DE EQUIPOS Y MAQUINARIAS 3,800.00
COSTO DIRECTO TOTAL 3,289,410.79
GASTO GENERALES (10%) 328,941.08
UTILIDADES (8%) 263,152.86
SUB TOTAL 3,881,504.73
IGV (18%) 698,670.85
COSTO TOTAL DE LA OBRA 4,580,175.58
EXPEDIENTE TÉCNICO (7.1011%) 325,246.60
SUPERVISIÓN (5%) 229,008.78
INVERSIÓN TOTAL S/. 5,134,430.96
I. TANGIBLES 325,931.87
1. Construcción de Infraestructura. 275,576.87
1.1 OBRAS PRELIMINARES 37,982.94
1.2 ESTRUCTURAS 105,750.64
1.3 ARQUITECTURA 96,535.37
1.4 I. ELECTRICAS 23,129.02
1.5 I. SANITARIAS 12,178.90
2. Equipamiento. 44,160.00
2.1 EQUIPAMIENTO Y MATERIALES 44,160.00
3. Capacitacion 3,695.00
3.1 CAPACITACION EN GESTION DE DESASTRES Y DEFENSA CIVIL 1,825.00
3.2 TALLER DE RELACIONES HUMANAS 1,870.00
4. Mitigacion Ambiental 2,500.00
4.1 MITIGACION DEL INPACTO AMBIENTAL 2,500.00
I. TANGIBLES 310,529.83
1. Construcción de Infraestructura. 260,174.83
1.1 OBRAS PRELIMINARES 37,982.94
1.2 ESTRUCTURAS 105,750.64
1.3 ARQUITECTURA 81,133.33
1.4 I. ELECTRICAS 23,129.02
1.5 I. SANITARIAS 12,178.90
2. Equipamiento. 44,160.00
2.1 EQUIPAMIENTO Y MATERIALES 44,160.00
3. Capacitacion 3,695.00
3.1 CAPACITACION EN GESTION DE DESASTRES Y DEFENSA CIVIL 1,825.00
3.2 TALLER DE RELACIONES HUMANAS 1,870.00
4. Mitigacion Ambiental 2,500.00
4.1 MITIGACION DEL INPACTO AMBIENTAL 2,500.00
1,329,558.62
1,329,558.62
0.909 287,940.43
0.410 136,564.50
0.85 51,830.28
0.85 853,223.40
57,473.54
1,329,558.62 1.3110095
132,955.86 sub total 75,348.36 21,515.20
106,364.69 53,833.16 27514.31 (26,318.85)
1,568,879.17
282,398.25 5,981.46 27514.61
1,851,277.42 0.1
0.847 101,107.91 59,814.63 55,383.91
0.909 108,508.96
2,060,894.29
70,581.26 0.18 59,814.63
12,704.63
ALTERNATIVA 02
Costos a Precios
FC COSTO DIRECTO TOTAL 0.00
Sociales (S/.)
GASTO GENERALES (10%) 0.00
2,388,940.36 UTILIDAD ( 8%) 0.00
2,388,940.36 (0.01)
238,894.04
191,115.23 55,383.91 -148.04
2,818,949.62 55531.95
507,410.93
3,326,360.56 6033.78 5,885.74
0.847 275,402.12
0.909 208,107.21
3,809,869.89
848,311.08 933800.55
132,755.12 85,489.47
219,880.61
119,277.37
120,601.35
36,161.29
163,642.56
21,423.00 848,311.08
34,569.78
558,247.72
558,247.72
105,078.10
41,009.53
VA 01 y 02
325,931.87
275,576.87
37,982.94
105,750.64
96,535.37
23,129.02
12,178.90
44,160.00
44,160.00
3,695.00
1,825.00
1,870.00
2,500.00
2,500.00
325,931.87
32,593.19
358,525.06
64,534.51
423,059.57
16,922.38
21,152.98
461,134.93
(16,748.10)
55,383.91
2,215.36
2,215.36
59,814.62 m
10,766.63
70,581.25
70,581.25
COSTOS DE OPERACIÓN Y MANTENIMIENTO
COSTOEN LA SITUACIÓN SIN PROYECTO
COSTO ANUAL
MENSUAL
CONCEPTOS CANTIDAD (precios
(precios
privados)
privados)
COSTOS DE OPERACIÓN 0.00
MEJORAMIENTO DEL SERVICIO EDUCATIVO
NIVEL PRIMARIO DE N° 36292 CCOSNIPUQUIO
DEL DISTRITO DE ACORIA, PROVINCIA Y Cantidad Precio Unitario 0.00
DEPARTAMENTO DE HUANCAVELICA.
Personal 0.00
Limpieza 0 0.00 0.00
Insumos 0.00
Insumos de Limpieza 0 0.00 0.00
Herramientas Manuales 0 0.00 0.00
COSTOS DE MANTENIMIENTO 228.00
Insumos 228.00
Materiales (Aulas, Direcccion, etc)
Limpieza de Aulas 45.00 12.00 540.00
Limpieza de Modulo Administrativo 15.00 12.00 180.00
Limpieza de Modulo Sum 0.00 12.00 0.00
Limpieza Servicios Higenicos 1.00 12.00 48.00
Limpieza de Cerco Perimetrico 0 12.00 0.00
Mantenimiento de Tanque Elevado y
0 0.50 0.00
Tanque Cisterna
Limpieza de Losa Deportiva 0.00 12.00 0.00
Materiales (Equipamiento con Mobiliario)
0 50 0
en Aulas
Materiales (Equipamiento con Equipos) en
0 50 0
Aulas
TOTAL DE COSTOS DE OPERACIÓN Y MANTENIMIENTO S/. 228.00
0.00
0.00
1.00 0.00
0.00
0.847 0.00
0.847 0.00
698.19
698.19
698.19
0.9091 490.91
0.9091 163.64
0.9091 0.00
0.9091 43.64
0.9091 0.00
0.9091 0.00
0.9091 0.00
0.9091 0.00
0.9091 0.00
698.19
1,733.53
1,733.53
606.60
1.00 606.60
1,126.93
0.847 1,118.04
0.847 8.89
11,585.26
11,585.26
11,585.26
0.9091 2,258.20
0.9091 2,258.20
0.9091 2,258.20
0.9091 10.91
0.9091 2,879.27
0.9091 0.45
0.9091 10.91
0.9091 318.19
0.9091 1,590.93
13,318.79
COSTOS DE OPERACIÓN Y MANTENIMIENTO EN LA SITUACIÓN SIN PROYECTO A PRECIO
AÑOS
DESCRIPCIÓN 2019 2020 2021 2022 2023 2024
0 1 2 3 4 5
DESCRIPCIÓN
0 1 2
1. COSTOS DE INVERSIÓN: 2,626,179.57 - -
1.1. MEJORAMIENTO DEL SERVICIO EDUCATIVO
NIVEL PRIMARIO DE N° 36292 CCOSNIPUQUIO DEL
1,714,619.34
DISTRITO DE ACORIA, PROVINCIA Y
DEPARTAMENTO DE HUANCAVELICA.
1.1.1. Mano de Obra Calificada 316,766.15
1.1.2. Mano de Obra No Calificada 333,084.15
1.1.3. Equipos y Herramientas 60,976.80
1.1.4. Insumos 1,003,792.24
PRECIOS SOCIALES
MENTALES - ALTERNATIVA
a Precios de Mercado sin Proyecto)
AÑOS
3 4 5 6 7 8 9 10
- - - - - - - -
- - - - - - - -
12,743.66 12,743.66 12,743.66 12,743.66 12,743.66 12,743.66 12,743.66 12,743.66
EMENTALES - ALTERNATIVA II
a Precios de Mercado Sin Proyecto)
AÑOS
3 4 5 6 7 8 9 10
- - - - - - - -
12,743.66 12,743.66 12,743.66 12,743.66 12,743.66 12,743.66 12,743.66 12,743.66
- - - - - - - -
12,743.66 12,743.66 12,743.66 12,743.66 12,743.66 12,743.66 12,743.66 12,743.66
228.00 228.00 228.00 228.00 228.00 228.00 228.00 228.00
- - - - - - - -
228.00 228.00 228.00 228.00 228.00 228.00 228.00 228.00
12,515.66 12,515.66 12,515.66 12,515.66 12,515.66 12,515.66 12,515.66 12,515.66
0.73 0.66 0.59 0.53 0.48 0.43 0.39 0.35
9,123.92 8,211.52 7,390.37 6,651.33 5,986.20 5,387.58 4,848.82 4,363.94
EMENTALES - ALTERNATIVA
s Soles a Precios de Sociales)
AÑOS
3 4 5 6 7 8 9 10
- - - - - - - -
11,585.26 11,585.26 11,585.26 11,585.26 11,585.26 11,585.26 11,585.26 11,585.26
- - - - - - - -
11,585.26 11,585.26 11,585.26 11,585.26 11,585.26 11,585.26 11,585.26 11,585.26
698.19 698.19 698.19 698.19 698.19 698.19 698.19 698.19
- - - - - - - -
698.19 698.19 698.19 698.19 698.19 698.19 698.19 698.19
10,887.07 10,887.07 10,887.07 10,887.07 10,887.07 10,887.07 10,887.07 10,887.07
EMENTALES - ALTERNATIVA II
s Soles a Precios de Sociales)
AÑOS
3 4 5 6 7 8 9 10
- - - - - - - -
- - - - - - - -
11,585.26 11,585.26 11,585.26 11,585.26 11,585.26 11,585.26 11,585.26 11,585.26
698.19 698.19 698.19 698.19 698.19 698.19 698.19 698.19
- - - - - - - -
698.19 698.19 698.19 698.19 698.19 698.19 698.19 698.19
10,887.07 10,887.07 10,887.07 10,887.07 10,887.07 10,887.07 10,887.07 10,887.07
0.73 0.66 0.59 0.53 0.48 0.43 0.39 0.35
7,936.68 7,143.01 6,428.71 5,785.84 5,207.25 4,686.53 4,217.87 3,796.09
ANALISIS DE RESULTADOS
ALTERNATIVA SELECCIONADA
DESCRIPCIÓN
Precios Privados Precios Sociales
N° BENEFICIARIOS 80 80
CAE (Costo Anual Equivalente) 242959 191224
VACT (Valor Actual de Costos) S/. 2699545 2124713
C/E (Costo Efectividad) 33744 26559
INVERSIÓN a Precios Privados S 2,626,1
2,626,179.57
ANÁLISIS DE SENSIBILIDAD
ESCENARIO INVERSIÓN VACT
LIDAD
C/E
37,182.48
31,870.70
29,214.81
27,886.86
26,558.91
25,230.97
23,903.02
21,247.13
15,935.35
CRONOGRAMA DE OBRA VALORIZADO
Metas
1 2 3 4 5 6
Componente I I: Suficiente y 251,280.07 251,280.07 251,280.07
Apropiados Ambientes
Componente II: Suficiente Mobiliario
y Equipamiento .
SUPERVISIÓN 39,790.60
GASTO GENERALES X
IGV 18% X
SUPERVICIÓN X
EXPEDIENTE TÉCNICO X X
Total por
7 8 9 10 Meta
251,280.07 1,507,680.40
11,808.00 11,808.00
119,371.80
1,946,659.29
X X 7.4%
X 0.4%
X X 6.5%
X X 13.9%
X X 2.0%
4.5%
CRONOGRAMA DE EJECUCIÓN FISICA ALTERNATIVAS I Y II
AÑO 0 (PERIODO EN MESES)
ITEM Metas MES MES MES MES MES MES MES MES MES MES
1 2 3 4 5 6 7 8 9 10
INVERSION
04.01 Capacitaciones x
ES)
MES MES Metas Responsable
11 12