PROYECTO:__VIVIENDA VIA BETHANIA___________________________________________________________________________________________________________

PROPIETARIO:_SUSANA TREJO___________________________________________________________
DIRECCIÓN:______________________________________________________________
CALCULO:______________________________________________________________________________
FECHA:___________SEPTIEMBRE DEL AÑO 2019 _

RENGLON:
TOTAL DE TOTAL DE TOTAL DE
LARGO ALTO AREA AREA DE AREA
M M M² PUERTAS ALTO LARGO AREA DE VENTANAS ALTO LARGO AREA DE DECREMENT TOTAL
No. EJE PUERTAS VENTANAS O

TOTAL 0.00 TOTAL 0.00

TOTAL 0.00 TOTAL 0.00

TOTAL 0.00 TOTAL 0.00

TOTAL TOTAL

TOTAL TOTAL

TOTAL TOTAL

7
7

TOTAL TOTAL

TOTAL TOTAL

TOTAL TOTAL

10

TOTAL TOTAL

11

TOTAL TOTAL

12

TOTAL TOTAL 0.00

13

TOTAL TOTAL

14

TOTAL TOTAL
0.00 TOTAL DE M²
#REF!
PROYECTO:_______________________________________________________________________________________________________________________________________________________
PROPIETARIO: DIRECCIÓN:______________________________________________________________
CALCULO:______________________________________________________________________________
FECHA: 01 DE AGOSTO DEL AÑO 2017

REGLON: CALCULO DE BLOCK


DIMESIONES TIPO DE AREA SUB - 10% 20%
UNID./ TIPO VOLUMEN
MATERIAL LEVANTAD UNIDAD M² TOTAL TOTAL APROX. Bolsas / m3 M³ Sub Total
ANCHO ALTO LARGO O M² UNIDADES DESP. DE DESP.
MORTERO

RESUMEN
MATERIAL FACTOR /UNIDAD MATERIAL Area de muro TOTAL Unidad
Cemento
Arena de rio
Agua

OBSERVACIONES:_____________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________________
Total de
sacos de
50Kg
PROYECTO:_______________________________________________________________________________________________________________________________________________________
PROPIETARIO:__________________________________________________________________________
DIRECCIÓN:______________________________________________________________
CALCULO:______________________________________________________________________________
FECHA:______01 DE AGOSTO DEL AÑO 2017 __________________________________

REGLAMENTO: CALCULO DE CONCRETO


DIMENSIONES VOLUMEN MATER. 10% VOLUMEN TOTAL APROX. VOLUMETRICA
VOLUMEN No. VOLUMEN
ELEMENTO UNIDAD UNIDADES TOTAL MATERIALES FACTOR
No. CONSTRUCTIVO ANCHO ALTO LARGO M³ M³ CANTIDAD UNIDADES Desp. y fugas CANTIDAD UNIDADES CANTIDAD UNIDADES

ESPECIFICACIONES:_______________________________________________________________ RESUMEN
__________________________________________________________________________________ CEMENTO SACOS
__________________________________________________________________________________ ARENA M3
__________________________________________________________________________________ GRAVA M3

OBSERVACIONES:____________________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________________________________
#REF!
#REF!
#REF!
PROYECTO:_______________________________________________________________________________________________________________________________________________________
PROPIETARIO:__________________________________________________________________________
DIRECCIÓN:______________________________________________________________
CALCULO:______________________________________________________________________________
FECHA:______01 DE AGOSTO DEL AÑO 2017 __________________________________

REGLAMENTO: CALCULO DE CONCRETO


DIMENSIONES VOLUMEN MATER. 10% VOLUMEN TOTAL APROX. VOLUMETRICA
VOLUMEN No. VOLUMEN
ELEMENTO UNIDAD UNIDADES TOTAL MATERIALES FACTOR
No. CONSTRUCTIVO ANCHO ALTO LARGO M³ M³ CANTIDAD UNIDADES Desp. y fugas CANTIDAD UNIDADES CANTIDAD UNIDADES
Cemento 8.40 2.36 Sacos 0.24 2.60 Sacos 3 Sacos
1 Zapata tipo 1 0.75 0.25 0.75 0.14 2 0.28 Arena de rio 0.47 0.13 M3 0.01 0.15 M3 0.1 M3
Grava 0.71 0.20 M3 0.02 0.22 M3 0.2 M3
Cemento 8.40 111.01 Sacos 11.10 122.12 Sacos 122 Sacos
2 Cimiento Corrido 0.40 0.20 165.20 13.22 1 13.22 Arena de rio 0.47 6.21 M3 0.62 6.83 M3 6.8 M3
Grava 0.71 9.38 M3 0.94 10.32 M3 10.3 M3
Cemento 8.40 41.58 Sacos 4.16 45.74 Sacos 46 Sacos
Soleras de
3 0.15 0.20 165.00 4.95 1 4.95 Arena de rio 0.47 2.33 M3 0.23 2.56 M3 2.6 M3
humedad
Grava 0.71 3.51 M3 0.35 3.87 M3 3.9 M3
Cemento 8.40 0.00 Sacos 0.00 0.00 Sacos 0 Sacos
4 Arena de rio 0.47 0.00 M3 0.00 0.00 M3 0.0 M3
Grava 0.71 0.00 M3 0.00 0.00 M3 0.0 M3
Cemento 8.40 0.00 Sacos 0.00 0.00 Sacos 0 Sacos
5 Arena de rio 0.47 0.00 M3 0.00 0.00 M3 0.0 M3
Grava 0.71 0.00 M3 0.00 0.00 M3 0.0 M3

6
ESPECIFICACIONES:_______________________________________________________________ RESUMEN
__________________________________________________________________________________ CEMENTO 170 SACOS
__________________________________________________________________________________ ARENA 9.5 M3
__________________________________________________________________________________ GRAVA 14.4 M3

OBSERVACIONES:____________________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________________________________
170
10
14
PROYECTO:_______________________________________________________________________________________________________________________________________________________
PROPIETARIO: LUIS PEDRO GODOY SOLARES DIRECCIÓN:______________________________________________________________
CALCULO:______________________________________________________________________________ FECHA: 01 DE AGOSTO DEL AÑO 2017

RENGLON: CALCULO DE HIERRO


ELEMENTO LONGITUD 15%
LARGO CANTIDAD No. DE TOTAL LONGITUD CANTIDAD VARILLAS/
CONSTRUCTIV COLOCACIÓN DIAMETRO MTS DE ELEMENTOS DE TOTAL TOTAL VARILLAS qq qq
No. O HIERROS UNID. MTS Desp. Ancl. Tr MTS 20'/6.10
Transversal 1/2" 0.60 7 2 14 8.40 1.26 9.66 1.61 7.00 0.23
1 Zapata tipo 1
Longitudinal 1/2" 0.60 7 2 14 8.40 1.26 9.66 1.61 7.00 0.23
Transversal 1/4" 0.50 1 825 825 412.50 61.88 474.38 79.06 30.00 2.64
2 Cimiento Corrido
Longitudinal 3/8" 165.00 4 1 4 660.00 99.00 759.00 126.50 13.00 9.73
Transversal 1/4" 0.65 3 825 2475 1608.75 241.31 1850.06 308.34 30.00 10.28
3 Soleras
Longitudinal 3/8" 165.00 4 3 12 1980.00 297.00 2277.00 379.50 13.00 29.19
Transversal 0.00 0.00 0.00 0.00 #DIV/0!
4
Longitudinal 0.00 0.00 0.00 0.00 #DIV/0!
Transversal 0.00 0.00 0.00 0.00 #DIV/0!
Longitudinal 0.00 0.00 0.00 0.00 #DIV/0!
Transversal 0.00 0.00 0.00 0.00 #DIV/0!
Longitudinal 0.00 0.00 0.00 0.00 #DIV/0!

ESPECIFICACIONES: RESUMEN costo unitario


______________________________________________________________
______________________________________________________________
DIAMETRO VARILLAS qq
______________________________________________________________ HIERRO DE 1/4
______________________________________________________________ HIERRO DE 3/8
______________________ HIERRON DE 1/2
ALAMBRE DE AMARRE (libras)
OBSERVACIONES:__________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________________________
costo total

0
PROYECTO:_______________________________________________________________________________________________________________________________________________________
PROPIETARIO: LUIS PEDRO GODOY SOLARES DIRECCIÓN:_____________________________________________________
CALCULO:______________________________________________________________________________ FECHA: 01 DE AGOSTO DEL AÑO 2017

RENGLON: CALCULO DE HIERRO


DIMENSIONES DE LONGITUD
ELEMENTO AMBIENTE LARGO CANTIDAD No. DE TOTAL 15% LONGITUD CANTIDAD VARILLAS/
CONSTRUCTIV LADO COLOCACIÓN DIAMETRO MTS DE ELEMENTOS DE
TOTAL
TOTAL VARILLAS qq
No. O ANCHO LARGO MTS
HIERROS UNID. Desp. Ancl. Tr MTS 20'/6.10
ESPECIFICACIONES: RESUMEN
_______________________________________________________________________________________
_______________________________________________________________________________________
DIAMETRO VARILLAS qq
_______________________________________________________________________________________ HIERRO DE 1/4
_________ HIERRO DE 3/8
HIERRON DE 1/2
ALAMBRE DE AMARRE (libras) 0
OBSERVACIONES:____________________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________________________________
_______________
______________________________________

qq
qq

0
______________
_____________
TUBERIA PARA DRENAJE / PLUVIAL
No. Tipo Uso Cantidad Precion unidad Total
1 Tubo PVC de 4" Drenaje 9 Q 74.00 Q 666.00
2 Tubo PVC de 2" Drenaje 4 Q 29.00 Q 116.00
3 Tubo PVC de 4" Pluvial 8 Q 74.00 Q 592.00
4 Tubo PVC de 3" Pluvial 3 Q 45.00 Q 135.00
5 Reductor de 4" a 2" Drenaje 10 Q 7.00 Q 70.00
6 Reductor de 4" a 2" Pluvial 6 Q 7.00 Q 42.00
7 Codo a 90 de 4" Drenaje 6 Q 16.50 Q 99.00
8 Codo a 90 de 2" Drenaje 16 Q 10.00 Q 160.00
9 Codo a 90 de 4" Pluvial 7 Q 16.50 Q 115.50
10 Yee de 4" Drenaje 10 Q 25.00 Q 250.00
11 Yee de 4" Pluvial 1 Q 25.00 Q 25.00
12 Tee de 4" Drenaje 0 Q -
13 Tee de 4" Pluvial 2 Q 28.00 Q 56.00
14 Caja tipo reposadera Drenaje 4 Q -
15 Uniones PVC de 4" Drenaje 8 Q 9.90 Q 79.20
16 Uniones PVC de 2" Drenaje 8 Q 7.50 Q 60.00
17 3/4" de pegamento Durman PVC D/P 1 Q 135.00 Q 135.00
TOTAL Q 2,600.70

TUBERIA PARA AGUA FRIA / CALIENTE


No. Tipo Uso Cantidad Precion unidad Total
1 Tubo PVC de 3/4" Fria 9 Q 18.75 Q 168.75
2 Tubo PVC de 1/2" Fria 9 Q 14.25 Q 128.25
3 Tubo CPVC de 3/4" Caliente 5 Q 72.50 Q 362.50
4 Tubo CPVC de 1/2" Caliente 5 Q 43.80 Q 219.00
5 Reductor PVC de 3/4" a 1/2" liso Fria 25 Q 4.50 Q 112.50
6 Reductor CPVC de 3/4" a 1/2" liso Caliente 12 Q 6.00 Q 72.00
7 Codo PVC a 90 de 3/4" Fria 8 Q 4.00 Q 32.00
8 Codo PVC a 90 de 1/2" Fria 50 Q 2.50 Q 125.00
9 Codo CPVC a 90 de 3/4" Caliente 10 Q 7.00 Q 70.00
10 Codo CPVC a 90 de 1/2" Caliente 20 Q 5.00 Q 100.00
11 Tee de PVC de 3/4" Fria 22 Q 4.50 Q 99.00
12 Tee de PVC de 1/2" Fria 5 Q 3.50 Q 17.50
13 Tee de CPVC de 3/4" Caliente 12 Q 12.00 Q 144.00
14 Tee de CPVC de 1/2" Caliente 5 Q 10.00 Q 50.00
15 3/4" de pegamento Durman PVC F/C 1 Q 150.00 Q 150.00

TOTAL Q 1,850.50
PRECIOS SUPER MAYEN

TUBERIA PARA DRENAJE / PLUVIAL


No. Tipo Uso Cantidad Precion unidad Total
1 Tubo PVC de 4" Drenaje Q -
2 Tuvo PVC de 3" Drenaje Q -
3 Tubo PVC de 2" Drenaje Q -
4 Tubo PVC de 4" Pluvial Q -
5 Tubo PVC de 3" Pluvial Q -
6 Reductor de 4" a 2" Drenaje Q -
7 Reductor de 4" a 2" Pluvial Q -
7 Reductor de 4" a 3" Pluvial Q -
8 Codo a 90 de 4" Drenaje Q -
9 Codo a 90 de 2" Drenaje Q -
10 Codo a 90 de 4" Pluvial Q -
11 Yee de 4" Drenaje Q -
12 Yee de 4" Pluvial Q -
13 Tee de 4" Drenaje Q -
14 Tee de 4" Pluvial Q -
15 Caja tipo reposadera Drenaje Q -
16 Copla PVC de 4" Drenaje Q -
17 Copla PVC de 2" Drenaje Q -
18 3/4" de pegamento Durman PVC D/P Q -
TOTAL Q -

TUBERIA PARA AGUA FRIA / CALIENTE


No. Tipo Uso Cantidad Precion unidad Total
1 Tubo PVC de 3/4" Fria 9 Q 18.70 Q 168.30
2 Tubo PVC de 1/2" Fria 9 Q 14.25 Q 128.25
3 Tubo CPVC de 3/4" Caliente 5 Q 74.40 Q 372.00
4 Tubo CPVC de 1/2" Caliente 5 Q 43.80 Q 219.00
5 ReducidorPVC de 3/4" a 1/2" liso Fria 25 Q 1.00 Q 25.00
6 Reducidor CPVC de 3/4" a 1/2" liso Caliente 12 Q 2.50 Q 30.00
7 Codo PVC a 90 de 3/4" Fria 8 Q 1.00 Q 8.00
8 Codo PVC a 90 de 1/2" Fria 50 Q 2.50 Q 125.00
9 Codo CPVC a 90 de 3/4" Caliente 10 Q 6.00 Q 60.00
10 Codo CPVC a 90 de 1/2" Caliente 20 Q 2.40 Q 48.00
11 Tee de PVC de 3/4" Fria 22 Q 1.30 Q 28.60
12 Tee de PVC de 1/2" Fria 5 Q 1.00 Q 5.00
13 Tee de CPVC de 3/4" Caliente 12 Q 6.70 Q 80.40
14 Tee de CPVC de 1/2" Caliente 5 Q 2.70 Q 13.50
15 3/4" de pegamento Durman PVC F/C 1 Q 104.60 Q 104.60

TOTAL Q 1,415.65
Drenaje 4" Drenaje 2" Drenaje 4" plu

3.13 1.35 2.98


2.33 1.2 3.00
0.57 0.9 4.87
3.37 1.47 3.00
6.5 0.35 5.35
4.95 1.05 3.00
2.32 0.9 5.62

2.05 0.35 6.13


3.01 0.77 6.58
3.01 0.9 3.00
1.78 1.02 3.00
6.02 2.05 3.07
0.9 2.80
1.2
6.50666667 0.9 8.733

2.552

PVC de 3/4" PVC de 1/2" CPVC de 3/4" CPVC de 1/2"


1.67 1.17 0.42 0.91
1.27 1.75 3.95 1.75
8.58 1.17 0.6 1.18
3.51 0.75 1.95 0.9
0.53 1.00 2.05 1.9
2.87 0.9 0.36 1.75
8.06 1.52 3.00 1.9
| 0.65 0.4 6.2 0.9
1.43 1.7 1.8 1.33
3.00 1.75 3 0.9
2.41 1.7 1.02 1.33
4.35 0.75 0.82 1.75
3.00 1.7 3.96 3.15
10.00 0.9 0.9
1.12 0.54
8.555 0.9 4.855 1.53
1.12 0.9
0.75 0.6
1.12
1.75 4.02
3.84
0.4
3.84
0.6
3.82
0.9
2.65
0.9