PROYECTO: INSTALACIÓN DEL PUENTE CARROZABLE SOBRE EL RÍO AUCAYACU EN LA LOCALIDAD DE AUCAYACU, DISTRITO DE JOSÉ CRESPO Y CASTILLO – LEONCIO PRADO – HUÁNUCO
CRONOGRAMA DE DESEMBOLSOS
Descripción Parcial (S/.) MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08
Und.
Item Metrado Precio (S/.)
LOCALIDAD DE AUCAYACU, DISTRITO DE JOSÉ CRESPO Y CASTILLO – LEONCIO S/. 6,106,499.61 S/. 378,072.36 % DE AVANCE % ACUMULADO S/. 384,466.60 % DE AVANCE % ACUMULADO S/. 1,121,854.63 % DE AVANCE % ACUMULADO S/. 1,447,956.98 % DE AVANCE % ACUMULADO S/. 1,559,851.42 % DE AVANCE % ACUMULADO S/. 861,379.93 % DE AVANCE % ACUMULADO S/. 249,584.99 % DE AVANCE % ACUMULADO S/. 103,332.72 % DE AVANCE % ACUMULADO
PRADO – HUÁNUCO
01 OBRAS PROVISIONALES 193,340.92 162,059.79 83.82% 83.82% 8,854.70 4.58% 88.40% 9,149.86 4.73% 93.13% 8,854.70 4.58% 97.71% 3,578.77 1.85% 99.56% 0.00 0.00% 99.56% 0.00 0.00% 99.56% 843.10 0.44% 100.00%
01.01 OBRAS PROVISIONALES 22,274.98 22,274.98 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
01.01.01 CONSTRUCCIONES PROVISIONALES 22,274.98 22,274.98 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
01.01.01.01 CAMPAMENTO DE OBRA m2 180.00 101.31 18,235.80 18,235.80 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
01.01.01.02 CERCO DE PROTECCION m 160.00 17.30 2,768.00 2,768.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
01.01.01.03 CARTEL DE IDENTIFICACIÓN DE OBRA 2.40 X 3.60 M. und 1.00 1,271.18 1,271.18 1,271.18 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
01.02 OBRAS PRELIMINARES 170,222.84 139,784.81 82.12% 82.12% 8,854.70 5.20% 87.32% 9,149.86 5.38% 92.70% 8,854.70 5.20% 97.90% 3,578.77 2.10% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
01.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA GLB 1.00 53,764.00 53,764.00 53,764.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
01.02.02 TRANSPORTE DE MATERIALES DE CONSTRUCCION A OBRA GLB 1.00 66,001.00 66,001.00 66,001.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
01.02.03 LIMPIEZA Y DESFORESTACION MANUAL m2 1,900.00 4.36 8,284.00 8,284.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
01.02.04 TRAZO Y REPLANTEO PRELIMINAR m2 1,900.00 1.42 2,698.00 2,698.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
01.02.05 TRAZO, Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO mes 8.00 4,484.48 35,875.84 5,437.81 15.16% 15.16% 8,854.70 24.68% 39.84% 9,149.86 25.50% 65.34% 8,854.70 24.68% 90.02% 3,578.77 9.98% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
01.02.06 REUBICACION DE POSTES DE ALUMBRADO PÚBLICO und 2.00 1,800.00 3,600.00 3,600.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
01.03 VARIOS 843.10 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 843.10 100.00% 100.00%
01.03.01 PLACA RECORDATORIA DE OBRA DE ACRÍLICO DE 0.45 x 0.55 SEGÚN pza DISEÑO 1.00 764.73 764.73 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 764.73 100.00% 100.00%
01.03.02 LIMPIEZA FINAL DE OBRA GLB 1.00 78.37 78.37 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 78.37 100.00% 100.00%
02 SEGURIDAD Y SALUD EN OBRA 64,131.34 62,350.40 97.22% 97.22% 1,780.95 2.78% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.01 ELABORACION DE DOCUMENTOS 1,000.00 1,000.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.01.01 ELABORACIÓN, IMPLEMENTACIÓN Y ADMINISTRACIÓN DEL PLAN DE GLBSEGURIDAD 1.00Y SALUD
1,000.00
EN EL TRABAJO1,000.00 1,000.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.02 EXAMEN MEDICOS OCUPACIONALES 6,377.00 6,377.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.02.01 EXÁMENES MÉDICOS PARA EQUIPO TÉCNICO (PROFESIONALES) und 5.00 182.20 911.00 911.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.02.02 EXÁMENES MÉDICOS PARA OPERARIOS Y OFICIALES und 10.00 182.20 1,822.00 1,822.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.02.03 EXÁMENES MÉDICOS PARA PEONES und 20.00 182.20 3,644.00 3,644.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.03 CAPACITACIONES EN SEGURIDAD Y SALUD EN EL TRABAJO 1,132.64 820.80 72.47% 72.47% 311.84 27.53% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.03.01 CAPACITACIONES Y CHARLAS EN SEGURIDAD Y SALUD EN EL TRABAJO 140.80 140.80 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.03.01.01 CAPACITACIONES PREVENTIVAS mes 8.00 8.80 70.40 70.40 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.03.01.02 CAPACITACIONES CORRECTIVA mes 8.00 8.80 70.40 70.40 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.03.02 CHARLAS EN SEGURIDAD Y SALUD EN EL TRABAJO 991.84 680.00 68.56% 68.56% 311.84 31.44% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.03.02.01 CHARLAS DE INICIO DE JORNADA (10 MINUTOS) mes 8.00 85.00 680.00 680.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.03.02.02 CHARLAS DE INDUCCIÓN mes 8.00 38.98 311.84 0.00 0.00% 0.00% 311.84 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.04 EQUIPOS DE PROTECCIÓN 8,667.83 8,667.83 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.04.01 EQUIPO DE PROTECCION PERSONAL TRIMES 2.67 2,560.11 6,835.49 6,835.49 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.04.02 EQUIPO DE PROTECCION COLECTIVA TRIMES 2.67 686.27 1,832.34 1,832.34 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.05 SEÑALIZACION TEMPORAL DE SEGURIDAD 3,209.50 3,209.50 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.05.01 LETRERO DE SEÑALES DE USO OBLIGATORIO und 5.00 641.90 3,209.50 3,209.50 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.06 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO 1,467.47 1,467.47 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.06.01 INSTALACION DE BOTIQUIN DE EMERGENCIA und 1.00 120.43 120.43 120.43 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.06.02 INSTALACION DE EXTINTOR TIPO DE POLVO PQS DE 6kg und 1.00 72.04 72.04 72.04 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.06.03 CAPACITACIÓN DE PRIMEROS AUXILIOS mes 4.00 300.00 1,200.00 1,200.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.06.04 CREACIÓN DE COMITE DE SEGURIDAD Y SALUD EN EL TRABAJO und 1.00 60.00 60.00 60.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.06.05 PROGRAMA DE INSPECCIONES Y AUDITORIAS und 1.00 15.00 15.00 15.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07 VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 42,276.90 40,807.80 96.53% 96.53% 1,469.11 3.47% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.01 ELABORACION DE DOCUMENTOS 1,500.00 1,500.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.01.01 ELABORACION DEL PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL
GLB DE1.00
COVID-191,500.00
EN EL TRABAJO 1,500.00 1,500.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.02 TRABAJOS PRELIMINARES 7,259.84 7,259.84 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.02.01 LIMPIEZA Y DESINFECCION EN OBRA mes 8.00 719.98 5,759.84 5,759.84 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.02.02 SENSIBILIZACION DE LA PREVENCION DEL CONTAGIO COVID-19GLB EN OBRA 1.00 1,500.00 1,500.00 1,500.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.03 IMPLEMENTOS DE PROTECCION PERSONAL 2,240.00 2,240.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.03.01 PROTECCION DEL PERSONAL DE LA OBRA - COVID - 19 GLB 1.00 2,240.00 2,240.00 2,240.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.04 EN LA FASE DE INICIO DE ACTIVIDADES A SER IMPLEMENTADAS 13,352.50 13,352.50 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.04.01 EVALUACION DE DESCARTE mes 8.00 1,000.00 8,000.00 8,000.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.04.02 IDENTIFICACION DE SINTOMALOGIA COVID-19 und 50.00 27.05 1,352.50 1,352.50 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.04.03 PANELES INFORMATIVOS COVID-19 und 5.00 300.00 1,500.00 1,500.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.04.04 EVALUACION MEDICA (GRUPOS ETARIOS) und 50.00 10.00 500.00 500.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.04.05 SERVICIO DE TRASLADO DEL PERSONAL HASTA LA OBRA mes 8.00 250.00 2,000.00 2,000.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.05 EN LA FASE DE EJECUCION Y FASE DE CIERRE DE ACTIVIDADES A SER IMPLEMENTADAS 11,782.48 11,737.63 99.62% 99.62% 44.86 0.38% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.05.01 ZONA DE CONTROL PREVIO mes 8.00 436.74 3,493.92 3,449.07 98.72% 98.72% 44.86 1.28% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.05.02 ZONA DE CONTROL DE DESINFECCION mes 8.00 391.74 3,133.92 3,133.92 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.05.03 ZONA DE CONTROL DE VESTUARIOS mes 8.00 320.69 2,565.52 2,565.52 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.05.04 ZONA DE TRABAJO mes 8.00 323.64 2,589.12 2,589.12 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.06 MEDIDAS PARA LA OPERACION DE MAQUINARIAS PESADAS Y VEHICULOS LIGEROS 1,374.00 1,374.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.06.01 ZONAS DOTADAS DE AGUA, JABON, PAPEL SECANTE Y SOLUCION mesHIDROALCOHOLICA
8.00 AL
115.50
70% 924.00 924.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.06.02 CONTENEDOR DE DESECHOS und 3.00 150.00 450.00 450.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.07 MEDIDAS PREVENTIVAS DURANTE EL TRABAJO A CARGO DE LOS ACTORES DEL PROCESO 4,768.08 3,343.83 70.13% 70.13% 1,424.25 29.87% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
02.07.07.01 ZONA DE SEGUIMIENTO Y CONTROL DE LIMPIEZA Y DESINFECCION mes DE MAQUINARIAS
8.00 PESADAS
596.01 Y VEHICULOS
4,768.08 3,343.83 70.13% 70.13% 1,424.25 29.87% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03 SUB-ESTRUCTURA 2,958,982.52 9,126.36 0.31% 0.31% 343,039.35 11.59% 11.90% 1,112,704.77 37.60% 49.51% 1,429,606.48 48.31% 97.82% 64,505.56 2.18% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.01 TRABAJOS PRELIMINARES 108,084.00 9,126.36 8.44% 8.44% 98,957.64 91.56% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,500.00 4.44 6,660.00 6,660.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.01.02 TRAZO Y NIVELACIÓN Y REPLANTEO m2 1,500.00 2.60 3,900.00 2,466.36 63.24% 63.24% 1,433.64 36.76% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.01.03 ENCAUSAMIENTO DE CURSOS DE AGUA RENDIMIENTO=350 M3/DIA m3 4,050.00 24.08 97,524.00 0.00 0.00% 0.00% 97,524.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.02 MOVIMIENTO DE TIERRAS 513,918.95 0.00 0.00% 0.00% 89,681.77 17.45% 17.45% 0.00 0.00% 17.45% 424,237.18 82.55% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.02.01 EXCAVACIONES 89,681.77 0.00 0.00% 0.00% 89,681.77 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.02.01.01 EXCAVACIÓN EN SUELO NO CLASIFICADO BAJO AGUA m3 1,602.03 16.38 26,241.25 0.00 0.00% 0.00% 26,241.25 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.02.01.02 EXCAVACIÓN EN SUELO NO CLASIFICADO SECO DURO m3 4,806.10 13.20 63,440.52 0.00 0.00% 0.00% 63,440.52 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.02.02 RELLENOS 293,697.15 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 293,697.15 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.02.02.01 RELLENO CON MATERIAL SELECCIONADO (FILTRO), ESTRIBOS Ym3 ALAS 23.17 123.99 2,872.85 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 2,872.85 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.02.02.02 RELLENO CON MATERIAL DE PRÉSTAMO (ESTRIBOS Y ALAS) m3 4,718.11 61.64 290,824.30 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 290,824.30 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.02.03 ELIMINACION DE MATERIAL EXEDENTE 130,540.03 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 130,540.03 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.02.03.01 ELIMINACIÓN DE MATERIAL EXCEDENTE D< 5.00 Km m3 8,330.57 15.67 130,540.03 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 130,540.03 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.03 OBRAS DE CONCRETO SIMPLE 31,851.73 0.00 0.00% 0.00% 19,400.18 60.91% 60.91% 12,451.55 39.09% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.03.01 SOLADO DE ESTRIBOS 31,851.73 0.00 0.00% 0.00% 19,400.18 60.91% 60.91% 12,451.55 39.09% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.03.01.01 SOLADO, e= 20cm, f´c= 140 kg/cm2 m2 601.43 52.96 31,851.73 0.00 0.00% 0.00% 19,400.18 60.91% 60.91% 12,451.55 39.09% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.04 OBRAS DE CONCRETO ARMADO 1,948,480.68 0.00 0.00% 0.00% 134,999.76 6.93% 6.93% 1,100,253.22 56.47% 63.40% 713,227.70 36.60% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.04.01 ENCOFRADO 394,444.36 0.00 0.00% 0.00% 0.00 0.00% 0.00% 166,430.81 42.19% 42.19% 228,013.55 57.81% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.04.01.01 ENCOFRADO Y DESENCOFRADO DE CIMENTACIÓN BAJO AGUA m2 325.26 187.93 61,126.11 0.00 0.00% 0.00% 0.00 0.00% 0.00% 61,126.11 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.04.01.02 ENCOFRADO Y DESENCOFRADO DE PANTALLAS DE ESTRIBOS -m2 BAJO AGUA 560.34 187.93 105,304.70 0.00 0.00% 0.00% 0.00 0.00% 0.00% 105,304.70 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.04.01.03 ENCOFRADO Y DESENCOFRADO DE PANTALLAS DE ESTRIBOS -m2 SECO 1,681.02 135.64 228,013.55 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 228,013.55 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.04.02 CONCRETO 1,080,280.47 0.00 0.00% 0.00% 0.00 0.00% 0.00% 643,612.64 59.58% 59.58% 436,667.83 40.42% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.04.02.01 CONCRETO, f´c= 280 kg/cm2, EN CIMIENTOS DE ESTRIBOS BAJO m3AGUA 713.52 708.61 505,607.41 0.00 0.00% 0.00% 0.00 0.00% 0.00% 505,607.41 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.04.02.02 CONCRETO, f´c= 280 kg/cm2, EN PANTALLA DE ESTRIBOS BAJO AGUA
m3 204.85 708.61 145,158.76 0.00 0.00% 0.00% 0.00 0.00% 0.00% 138,005.23 95.07% 95.07% 7,153.53 4.93% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.04.02.03 CONCRETO, f´c= 280 kg/cm2, EN PANTALLA DE ESTRIBOS SECO m3 614.54 698.92 429,514.30 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 429,514.30 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.04.03 ACERO 473,755.85 0.00 0.00% 0.00% 134,999.76 28.50% 28.50% 290,209.77 61.26% 89.75% 48,546.32 10.25% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.04.03.01 ACERO, fy= 4200 kg/cm2, EN CIMIENTOS DE ESTRIBOS BAJO AGUA kg 20,971.02 7.92 166,090.48 0.00 0.00% 0.00% 134,999.76 81.28% 81.28% 31,090.72 18.72% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.04.03.02 ACERO, fy= 4200 kg/cm2, EN PANTALLA DE ESTRIBOS BAJO AGUA kg 9,110.05 7.92 72,151.60 0.00 0.00% 0.00% 0.00 0.00% 0.00% 72,151.60 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.04.03.03 ACERO, fy= 4200 kg/cm2, EN PANTALLA DE ESTRIBOS SECO kg 32,042.69 7.35 235,513.77 0.00 0.00% 0.00% 0.00 0.00% 0.00% 186,967.45 79.39% 79.39% 48,546.32 20.61% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.05 FALSO PUENTE 333,639.20 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 279,281.90 83.71% 83.71% 54,357.30 16.29% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.05.01 ALQUILER DE FALSO PUENTE CON ENCOFRADO METALICO m 58.00 5,752.40 333,639.20 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 279,281.90 83.71% 83.71% 54,357.30 16.29% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.06 OTROS 23,007.96 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 12,859.70 55.89% 55.89% 10,148.26 44.11% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.06.01 ACCESORIOS 3,681.76 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 3,681.76 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.06.01.01 APARATO DE APOYO MÓVIL 1,848.78 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,848.78 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.06.01.01.01 APOYO MOVIL TIPO I und 2.00 633.80 1,267.60 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,267.60 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.06.01.01.02 APOYO MOVIL TIPO II und 1.00 581.18 581.18 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 581.18 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.06.01.02 APARATO DE APOYO FIJO 1,832.98 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,832.98 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.06.01.02.01 APOYO FIJO TIPO I und 2.00 625.90 1,251.80 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,251.80 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.06.01.02.02 APOYO FIJO TIPO II und 1.00 581.18 581.18 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 581.18 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.06.02 JUNTAS DE DILATACIÓN 6,466.50 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 6,466.50 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.06.02.01 JUNTA DE DILATACION METALICA m 30.00 215.55 6,466.50 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 6,466.50 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.06.03 VARIOS 12,859.70 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 12,859.70 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
03.06.03.01 DRENAJE DE ESTRIBOS CON TUBOS PVC SAP; Ø=2" m 343.20 37.47 12,859.70 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 12,859.70 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04 SUPER-ESTRUCTURA 2,311,266.83 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,472,324.63 63.70% 63.70% 811,480.59 35.11% 98.81% 27,461.61 1.19% 100.00% 0.00 0.00% 100.00%
04.01 CONCRETO ARMADO 2,198,139.46 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,472,324.63 66.98% 66.98% 725,687.32 33.01% 99.99% 127.51 0.01% 100.00% 0.00 0.00% 100.00%
04.01.01 VEREDAS Y GUARDAVIAS 108,801.71 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 34,254.54 31.48% 31.48% 74,547.17 68.52% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.01.01 VEREDA Y GUARDAVIA: CONCRETO F'c=280 kg/cm2 m3 51.04 706.47 36,058.23 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 36,058.23 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.01.02 VEREDA Y GUARDAVIA : ENCOFRADO Y DESENCOFRADO m2 279.56 187.46 52,406.32 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 34,254.54 65.36% 65.36% 18,151.78 34.64% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.01.03 VEREDA Y GUARDAVIA : ACERO ; fy=4200 kg/cm2 kg 3,058.22 6.65 20,337.16 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 20,337.16 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.02 LOSA DE PUENTE 435,563.80 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 73,817.01 16.95% 16.95% 361,746.79 83.05% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.02.01 LOSA PUENTE: CONCRETO; fc=280 Kg/cm2 m3 156.60 706.47 110,633.20 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 110,633.20 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.02.02 LOSA PUENTE: ENCOFRADO Y DESENCOFRADO m2 660.80 187.46 123,873.57 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 73,817.01 59.59% 59.59% 50,056.56 40.41% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.02.03 LOSA PUENTE: ACERO ; fy=4200 kg/cm2 kg 30,234.14 6.65 201,057.03 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 201,057.03 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.03 VIGA DIAFRAGMA 286,565.41 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 254,815.83 88.92% 88.92% 31,622.07 11.03% 99.96% 127.51 0.04% 100.00% 0.00 0.00% 100.00%
04.01.03.01 VIGA DIAFRAGMA : CONCRETO: Fc=350 Kg/cm2 m3 55.44 758.97 42,077.30 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 42,077.30 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.03.02 VIGA DIAFRAGMA : ENCOFRADO Y DESENCOFRADO m2 184.80 187.46 34,642.61 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 34,642.61 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.03.03 VIGA DIAFRAGMA: ACERO ; fy=4200 kg/cm2 kg 17,060.03 6.65 113,449.20 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 113,449.20 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.03.04 CABLE POSTENSADO PARA VIGAS - VIGA DIAFRAGMA TxM 30,602.00 3.15 96,396.30 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 64,646.72 67.06% 67.06% 31,622.07 32.80% 99.87% 127.51 0.13% 100.00% 0.00 0.00% 100.00%
04.01.04 VIGA ARCO PARABOLICO 172,984.83 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 33,754.19 19.51% 19.51% 139,230.64 80.49% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.04.01 VIGA ARCO PARABOLICO DE 0.50m x 1.00m : CONCRETO: Fc=350m3 Kg/cm2 59.37 758.97 45,060.05 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 45,060.05 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.04.02 VIGA ARCO PARABOLICO DE 0.50m x 1.00m: ENCOFRADO Y DESENCOFRADO
m2 294.76 187.46 55,255.71 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 33,754.19 61.09% 61.09% 21,501.52 38.91% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.04.03 VIGA ARCO PARABOLICO DE 0.50m x 1.00m: ACERO ; fy=4200 kg/cm2
kg 10,927.68 6.65 72,669.07 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 72,669.07 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.05 VIGA ARRIOSTRE METALICO 35,650.92 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 35,650.92 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.05.01 VIGA DE ARRIOSTRE METALICO acero A36 10X20 Cm e=12mm m 285.39 124.92 35,650.92 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 35,650.92 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.06 VIGAS LONGITUDINALES DE 080m x 1.50m 1,158,572.79 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,075,683.06 92.85% 92.85% 82,889.73 7.15% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.06.01 VIGA LONGITUDINALES : CONCRETO: Fc=350 Kg/cm2 m3 208.80 758.97 158,472.94 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 158,472.94 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.06.02 VIGA LONGITUDINALES: ENCOFRADO Y DESENCOFRADO m2 502.80 187.46 94,254.89 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 94,254.89 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.06.03 VIGA LONGITUDINALES: ACERO ; fy=4200 kg/cm2 kg 93,578.13 6.65 622,294.56 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 622,294.56 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.01.06.04 CABLE POSTENSADO PARA VIGAS - VIGA PRINCIPAL TxM 90,016.00 3.15 283,550.40 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 200,660.67 70.77% 70.77% 82,889.73 29.23% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.02 CABLES 22,384.76 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 22,336.61 99.78% 99.78% 48.15 0.22% 100.00% 0.00 0.00% 100.00%
04.02.01 CABLE DE SUJECCION ENTRE VIGAS PARABOLICAS Y TABLERO 22,384.76 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 22,336.61 99.78% 99.78% 48.15 0.22% 100.00% 0.00 0.00% 100.00%
04.02.01.01 CABLES: CABLE DE ACERO STRANDPLAST A-586 Ø=65 mm m 138.92 133.96 18,609.72 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 18,609.72 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.02.01.02 PENDOLAS PARA PUENTE GLB 1.00 3,389.81 3,389.81 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 3,389.81 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.02.01.03 IZAJE Y COLOCACION DE CABLE DE ACERO ton 1.17 329.26 385.23 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 337.08 87.50% 87.50% 48.15 12.50% 100.00% 0.00 0.00% 100.00%
04.03 PAVIMENTOS 16,653.05 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 16,653.05 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.03.01 PAVIMENTO ASFALTICO 16,653.05 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 16,653.05 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.03.01.01 IMPRIMACION BITUMINOSA m2 417.60 8.00 3,340.80 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 3,340.80 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.03.01.02 PREPARACION DE MEZCLA ASFALTICA EN FRIO m3 15.66 609.28 9,541.32 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 9,541.32 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.03.01.03 ESPARCIDO Y COMPACTADO DE MEZCLA ASFALTICA m2 417.60 9.03 3,770.93 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 3,770.93 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.04 SEÑALES INFORMATIVAS Y PINTURA 11,212.63 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 3,157.51 28.16% 28.16% 8,055.12 71.84% 100.00% 0.00 0.00% 100.00%
04.04.01 PINTURA 11,212.63 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 3,157.51 28.16% 28.16% 8,055.12 71.84% 100.00% 0.00 0.00% 100.00%
04.04.01.01 PINTURA EN SEÑALIZACIÓN DE VÍA m2 30.59 4.32 132.15 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 132.15 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.04.01.02 PINTURA EN BARANDA METALICA m 963.52 11.50 11,080.48 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 3,025.36 27.30% 27.30% 8,055.12 72.70% 100.00% 0.00 0.00% 100.00%
04.05 OTROS 55,660.67 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 43,646.10 78.41% 78.41% 12,014.57 21.59% 100.00% 0.00 0.00% 100.00%
04.05.01 BARANDAS METALICAS 55,345.92 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 43,331.35 78.29% 78.29% 12,014.57 21.71% 100.00% 0.00 0.00% 100.00%
04.05.01.01 BARANDAS METÁLICA SEGÚN DISEÑO m 232.00 238.56 55,345.92 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 43,331.35 78.29% 78.29% 12,014.57 21.71% 100.00% 0.00 0.00% 100.00%
04.05.02 DRENAJE PLUVIAL 314.75 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 314.75 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.05.02.01 DRENAJE PLUVIAL EN LOSA; TUBO F°G° Ø=4" m 8.40 37.47 314.75 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 314.75 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
04.06 PRUEBAS 7,216.26 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 7,216.26 100.00% 100.00% 0.00 0.00% 100.00%
04.06.01 BARANDAS METÁLICA SEGÚN DISEÑO GLB 1.00 7,216.26 7,216.26 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 7,216.26 100.00% 100.00% 0.00 0.00% 100.00%
05 VIA DE ACCESOS 403,450.59 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 9,495.80 2.35% 2.35% 19,442.46 4.82% 7.17% 49,899.34 12.37% 19.54% 222,123.38 55.06% 74.60% 102,489.62 25.40% 100.00%
05.01 PAVIMENTOS 161,863.19 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 895.01 0.55% 0.55% 42,529.69 26.28% 26.83% 118,438.49 73.17% 100.00% 0.00 0.00% 100.00%
05.01.01 MOVIMIENTO DE TIERRAS 11,701.35 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 11,701.35 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.01.01.01 CORTE DEL TERRENO EN MATERIAL SUELTO CON MAQUINARIAm3 427.72 7.77 3,323.38 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 3,323.38 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.01.01.02 ELIMINACIÓN DE MATERIAL EXCEDENTE CON MAQUINARIA m3 534.65 15.67 8,377.97 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 8,377.97 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.01.02 PAVIMENTO RIGIDO e=8" 150,161.84 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 895.01 0.60% 0.60% 30,828.34 20.53% 21.13% 118,438.49 78.87% 100.00% 0.00 0.00% 100.00%
05.01.02.01 SUB RASANTE 2,897.78 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 2,897.78 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.01.02.01.01 PERFILADO Y COMPACTACION DE SUB RASANTE m2 1,069.29 2.71 2,897.78 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 2,897.78 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.01.02.02 PAVIMENTO RIGIDO e=8" 136,520.08 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 19,486.30 14.27% 14.27% 117,033.78 85.73% 100.00% 0.00 0.00% 100.00%
05.01.02.02.01 BASE GRANULAR E=0.20 M m2 1,069.29 14.42 15,419.16 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 15,419.16 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.01.02.02.02 ENCOFRADO Y DESENCOFRADO m2 42.96 96.30 4,137.05 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 4,067.14 98.31% 98.31% 69.91 1.69% 100.00% 0.00 0.00% 100.00%
05.01.02.02.03 ACERO EN JUNTAS DE CONSTRUCCION TRANSVERSAL D=3/4"kg - LISO 162.00 7.37 1,193.94 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,193.94 100.00% 100.00% 0.00 0.00% 100.00%
05.01.02.02.04 ACERO EN JUNTAS DE CONSTRUCCION LONGITUDINAL D=5/8"kg - CORUGADO257.54 5.68 1,462.83 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,462.83 100.00% 100.00% 0.00 0.00% 100.00%
05.01.02.02.05 PAVIMENTO DE CONCRETO f'c=210kg/cm2, e=0.20M, INC. ACABADO,
m2 FROTACHADO
1,069.29 Y CURADO
103.87 111,067.15 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 111,067.15 100.00% 100.00% 0.00 0.00% 100.00%
05.01.02.02.06 CURADO DE CONCRETO CON ADITIVO m2 1,069.29 3.03 3,239.95 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 3,239.95 100.00% 100.00% 0.00 0.00% 100.00%
05.01.02.03 SELLADO DE JUNTAS 1,404.71 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,404.71 100.00% 100.00% 0.00 0.00% 100.00%
05.01.02.03.01 JUNTAS DE CONTRACCIÓN E=1/2", H=2" m 72.00 6.04 434.88 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 434.88 100.00% 100.00% 0.00 0.00% 100.00%
05.01.02.03.02 JUNTAS DE DILATACIÓN EN LOSA E = 1", H = 0.15 M m 147.00 6.57 965.79 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 965.79 100.00% 100.00% 0.00 0.00% 100.00%
05.01.02.03.03 JUNTAS DE AISLAMIENTO CON TEKNOPORT E = 1" m 1.77 2.28 4.04 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 4.04 100.00% 100.00% 0.00 0.00% 100.00%
05.01.02.04 TRANSPORTE DE MATERIAL GRANULAR DE CANTERA 9,339.27 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 895.01 9.58% 9.58% 8,444.26 90.42% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.01.02.04.01 TRANSPORTE DE MATERIAL GRANULAR - BASE m3 213.86 43.67 9,339.27 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 895.01 9.58% 9.58% 8,444.26 90.42% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.02 CUNETAS DE CONCRETO F'C=175 KG/CM2 53,576.70 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 53,576.70 100.00% 100.00% 0.00 0.00% 100.00%
05.02.01 TRABAJOS PRELIMINARES 472.60 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 472.60 100.00% 100.00% 0.00 0.00% 100.00%
05.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 67.13 4.44 298.06 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 298.06 100.00% 100.00% 0.00 0.00% 100.00%
05.02.01.02 TRAZO, NIVELACIÓN Y REPLANTEO m2 67.13 2.60 174.54 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 174.54 100.00% 100.00% 0.00 0.00% 100.00%
05.02.02 MOVIMIENTO DE TIERRAS 249.05 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 249.05 100.00% 100.00% 0.00 0.00% 100.00%
05.02.02.01 PERFILADO Y COMPACTADO DE TERRENO PARA CUNETAS m2 67.13 3.71 249.05 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 249.05 100.00% 100.00% 0.00 0.00% 100.00%
05.02.03 OBRAS DE CONCRETO SIMPLE 52,104.03 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 52,104.03 100.00% 100.00% 0.00 0.00% 100.00%
05.02.03.01 ENCOFRADO Y DESENCOFRADO m2 271.55 96.30 26,150.27 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 26,150.27 100.00% 100.00% 0.00 0.00% 100.00%
05.02.03.02 CONCRETO F'C=175 KG/CM2 m3 17.62 412.01 7,259.62 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 7,259.62 100.00% 100.00% 0.00 0.00% 100.00%
05.02.03.03 ACERO DE REFUERZO FY = 4200 KG/CM2 kg 1,751.84 6.65 11,649.74 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 11,649.74 100.00% 100.00% 0.00 0.00% 100.00%
05.02.03.04 TAPA DE CONCRETO PARA CANAL Fc=210 Kg/Cm2 und 84.00 81.88 6,877.92 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 6,877.92 100.00% 100.00% 0.00 0.00% 100.00%
05.02.03.05 CURADO DE CONCRETO CON ADITIVO m2 67.13 2.48 166.48 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 166.48 100.00% 100.00% 0.00 0.00% 100.00%
05.02.04 SELLADO DE JUNTAS 751.02 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 751.02 100.00% 100.00% 0.00 0.00% 100.00%
05.02.04.01 JUNTAS DE DILATACIÓN EN LOSA E = 1", H = 0.15 M m 114.31 6.57 751.02 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 751.02 100.00% 100.00% 0.00 0.00% 100.00%
05.03 VEREDA DE CONCRETO F'C=175 KG/CM2 52,777.07 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 22,277.10 42.21% 42.21% 30,499.97 57.79% 100.00%
05.03.01 TRABAJOS PRELIMINARES 2,635.64 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 2,635.64 100.00% 100.00% 0.00 0.00% 100.00%
05.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 374.38 4.44 1,662.25 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,662.25 100.00% 100.00% 0.00 0.00% 100.00%
05.03.01.02 TRAZO, NIVELACIÓN Y REPLANTEO m2 374.38 2.60 973.39 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 973.39 100.00% 100.00% 0.00 0.00% 100.00%
05.03.02 MOVIMIENTO DE TIERRAS 12,987.85 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 12,424.00 95.66% 95.66% 563.85 4.34% 100.00%
05.03.02.01 CORTE DE TERRENO MANUAL m3 56.16 43.62 2,449.70 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 2,449.70 100.00% 100.00% 0.00 0.00% 100.00%
05.03.02.02 ELIMINACIÓN DE MATERIAL EXCEDENTE CON MAQUINARIA m3 70.20 15.67 1,100.03 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 536.18 48.74% 48.74% 563.85 51.26% 100.00%
05.03.02.03 PERFILADO Y COMPACTADO DE TERRENO PARA CUNETAS m2 374.38 3.71 1,388.95 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,388.95 100.00% 100.00% 0.00 0.00% 100.00%
05.03.02.04 AFIRMADO DE e = 4" PARA VEREDAS m2 374.38 21.50 8,049.17 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 8,049.17 100.00% 100.00% 0.00 0.00% 100.00%
05.03.03 OBRAS DE CONCRETO SIMPLE 36,302.11 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 7,217.46 19.88% 19.88% 29,084.65 80.12% 100.00%
05.03.03.01 ENCOFRADO Y DESENCOFRADO m2 135.31 96.30 13,030.35 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 7,217.46 55.39% 55.39% 5,812.89 44.61% 100.00%
05.03.03.02 CONCRETO F'C=175 KG/CM2 m3 54.23 412.01 22,343.30 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 22,343.30 100.00% 100.00%
05.03.03.03 CURADO DE CONCRETO CON ADITIVO m2 374.38 2.48 928.46 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 928.46 100.00% 100.00%
05.03.04 SELLADO DE JUNTAS 851.47 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 851.47 100.00% 100.00%
05.03.04.01 JUNTAS DE DILATACIÓN EN LOSA E = 1", H = 0.15 M m 129.60 6.57 851.47 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 851.47 100.00% 100.00%
05.04 RAMPAS 1,499.72 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,499.73 100.00% 100.00%
05.04.01 RAMPAS PEATONAL 1,499.72 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,499.73 100.00% 100.00%
05.04.01.01 TRABAJOS PRELIMINARES 116.59 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 116.59 100.00% 100.00%
05.04.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 16.56 4.44 73.53 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 73.53 100.00% 100.00%
05.04.01.01.02 TRAZO, NIVELACIÓN Y REPLANTEO m2 16.56 2.60 43.06 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 43.06 100.00% 100.00%
05.04.01.02 MOVIMIENTO DE TIERRAS 529.11 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 529.12 100.00% 100.00%
05.04.01.02.01 CORTE DE TERRENO MANUAL m3 7.39 43.62 322.35 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 322.35 100.00% 100.00%
05.04.01.02.02 ELIMINACIÓN DE MATERIAL EXCEDENTE CON MAQUINARIA m3 9.24 15.67 144.79 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 144.79 100.00% 100.00%
05.04.01.02.03 PERFILADO Y COMPACTADO DE TERRENO PARA CUNETAS m2 10.56 3.71 39.18 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 39.18 100.00% 100.00%
05.04.01.02.04 AFIRMADO DE e = 4" PARA VEREDAS m2 1.06 21.50 22.79 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 22.80 100.04% 100.04%
05.04.01.03 OBRAS DE CONCRETO SIMPLE 854.02 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 854.02 100.00% 100.00%
05.04.01.03.01 CONCRETO F'C=175 KG/CM2 m3 1.06 412.01 436.73 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 436.73 100.00% 100.00%
05.04.01.03.02 CURADO DE CONCRETO CON ADITIVO m2 10.56 2.48 26.19 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 26.19 100.00% 100.00%
05.04.01.03.03 BRUÑADO DE RAMPAS D=5 CM m 201.60 1.94 391.10 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 391.10 100.00% 100.00%
05.05 SEÑALIZACIÓN Y SEGURIDAD VIAL 34,936.49 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 34,936.49 100.00% 100.00%
05.05.01 SEÑALIZACIÓN VERTICAL 10,427.20 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 10,427.20 100.00% 100.00%
05.05.01.01 SEÑAL REGLAMENTARIA INC/ POSTE DE SOPORTE TIPO I (0.60x0.60)
und 5.00 665.71 3,328.55 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 3,328.55 100.00% 100.00%
05.05.01.02 SEÑAL REGLAMENTARIA INC/ POSTE DE SOPORTE TIPO II (0.60X1.20)
und 3.00 1,319.73 3,959.19 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 3,959.19 100.00% 100.00%
05.05.01.03 SEÑAL REGLAMENTARIA INC/ POSTE DE SOPORTE TIPO III (0.90X2.25)
und 2.00 1,569.73 3,139.46 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 3,139.46 100.00% 100.00%
05.05.02 PINTADO DE LÍNEAS, SÍMBOLOS 2,549.72 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 2,549.72 100.00% 100.00%
05.05.02.01 PINTADO EN AMBOS BORDES, COLOR BLANCO m 239.90 2.38 570.96 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 570.96 100.00% 100.00%
05.05.02.02 PINTADO EN LÍNEA CENTRAL. COLOR AMARILLO m 170.00 1.99 338.30 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 338.30 100.00% 100.00%
05.05.02.03 PINTADO EN CRUCE PEATONAL, COLOR BLANCO m2 114.00 14.39 1,640.46 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,640.46 100.00% 100.00%
05.05.03 PINTADO EN FLECHA COLOR BLANCO 174.75 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 174.75 100.00% 100.00%
05.05.03.01 PINTADO EN FLECHA EN LÍNEA RECTA m2 6.40 11.55 73.92 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 73.92 100.00% 100.00%
05.05.03.02 PINTADO EN FLECHA EN LÍNEA RECTA Y GIRA EN UNA DIRECCIÓN m2 1.78 11.55 20.56 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 20.56 100.00% 100.00%
05.05.03.03 PINTADO EN FLECHA EN LÍNEA RECTA Y GIRA EN DOS DIRECCIONES m2 6.95 11.55 80.27 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 80.27 100.00% 100.00%
05.05.04
05.05.04.01
05.06
This document was created by an application that isn’t licensed to use novaPDF.
GUARDAVIAS
GUARDAVIAS METÁLICAS (L = 3.81 M)
PARQUES Y JARDINES
und 33.90 642.62
21,784.82
21,784.82
35,553.43
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
21,784.82
21,784.82
35,553.43
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
05.06.01 AREA VERDE 19,110.58 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 19,110.58 100.00% 100.00%
05.06.01.01
Purchase a license to generate PDF files without this notice.
TRABAJOS PRELIMINARES 1,830.40 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,830.40 100.00% 100.00%
CRONOGRAMA VALORIZADO DE OBRA
PROYECTO: INSTALACIÓN DEL PUENTE CARROZABLE SOBRE EL RÍO AUCAYACU EN LA LOCALIDAD DE AUCAYACU, DISTRITO DE JOSÉ CRESPO Y CASTILLO – LEONCIO PRADO – HUÁNUCO
CRONOGRAMA DE DESEMBOLSOS
Descripción Parcial (S/.) MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08
Und.
Item Metrado Precio (S/.)
LOCALIDAD DE AUCAYACU, DISTRITO DE JOSÉ CRESPO Y CASTILLO – LEONCIO S/. 6,106,499.61 S/. 378,072.36 % DE AVANCE % ACUMULADO S/. 384,466.60 % DE AVANCE % ACUMULADO S/. 1,121,854.63 % DE AVANCE % ACUMULADO S/. 1,447,956.98 % DE AVANCE % ACUMULADO S/. 1,559,851.42 % DE AVANCE % ACUMULADO S/. 861,379.93 % DE AVANCE % ACUMULADO S/. 249,584.99 % DE AVANCE % ACUMULADO S/. 103,332.72 % DE AVANCE % ACUMULADO
PRADO – HUÁNUCO
05.06.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 260.00 4.44 1,154.40 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,154.40 100.00% 100.00%
05.06.01.01.02 TRAZO, NIVELACIÓN Y REPLANTEO m2 260.00 2.60 676.00 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 676.00 100.00% 100.00%
05.06.01.02 MOVIMIENTO DE TIERRAS 17,280.18 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 17,280.18 100.00% 100.00%
05.06.01.02.01 TIERRA NEGRA DE CULTIVO m3 52.00 74.18 3,857.36 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 3,857.36 100.00% 100.00%
05.06.01.02.02 SIEMBRA DE GRASS AMERICANO m2 260.00 50.54 13,140.40 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 13,140.40 100.00% 100.00%
05.06.01.02.03 SIEMBRA DE PLANTONES - FICUS und 6.00 47.07 282.42 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 282.42 100.00% 100.00%
05.06.02 BASURRERO METALICO 988.97 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 988.97 100.00% 100.00%
05.06.02.01 CONCRETO F'C=175 KG/CM2 m3 0.58 412.01 238.97 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 238.97 100.00% 100.00%
05.06.02.02 BASURERO DE Fe C/PINTURA ANTICORROSIVA und 3.00 250.00 750.00 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 750.00 100.00% 100.00%
05.06.03 BANCAS ORDAMENTALES 15,453.88 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 15,453.88 100.00% 100.00%
05.06.03.01 CONCRETO F'C=175 KG/CM2 m3 4.20 412.01 1,730.44 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,730.44 100.00% 100.00%
05.06.03.02 INSTALACIÓN DE BANCA S/ DISEÑO INCL. PERGOLAS und 8.00 1,715.43 13,723.44 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 13,723.44 100.00% 100.00%
05.07 ALCANTARILLA TIPO MARCO 28,043.25 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 9,495.80 33.86% 33.86% 18,547.45 66.14% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.07.01 TRABAJOS PRELIMINARES 246.26 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 246.26 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.07.01.01 LIMPIEZA DE TERRENO MANUAL m2 34.98 4.44 155.31 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 155.31 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.07.01.02 TRAZO, NIVELACIÓN Y REPLANTEO m2 34.98 2.60 90.95 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 90.95 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.07.02 MOVIMIENTO DE TIERRAS 129.78 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 129.78 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.07.02.01 PERFILADO Y COMPACTADO DE TERRENO PARA CUNETAS m2 34.98 3.71 129.78 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 129.78 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.07.03 OBRAS DE CONCRETO SIMPLE 27,667.21 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 9,119.76 32.96% 32.96% 18,547.45 67.04% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.07.03.01 ENCOFRADO Y DESENCOFRADO m2 145.75 96.30 14,035.73 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 9,119.76 64.98% 64.98% 4,915.97 35.02% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.07.03.02 CONCRETO F'C=175 KG/CM2 m3 12.83 412.01 5,286.09 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 5,286.09 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.07.03.03 ACERO DE REFUERZO FY = 4200 KG/CM2 kg 1,241.90 6.65 8,258.64 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 8,258.64 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.07.03.04 CURADO DE CONCRETO CON ADITIVO m2 34.98 2.48 86.75 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 86.75 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.08 INSTALACIONES ELECTRICAS 35,200.74 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 7,369.65 20.94% 20.94% 27,831.09 79.06% 100.00% 0.00 0.00% 100.00%
05.08.01 SUMINISTRO Y MONTAJE DE RED DE ALIMENTACION 20,913.02 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 7,369.65 35.24% 35.24% 13,543.37 64.76% 100.00% 0.00 0.00% 100.00%
05.08.01.01 TRAZOS DE NIVELES Y REPLANTEO 90.95 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 90.95 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.08.01.01.01 TRAZO, NIVELACIÓN Y REPLANTEO m2 34.98 2.60 90.95 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 90.95 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.08.01.02 MOVIMIENTO DE TIERRAS 256.51 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 256.51 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.08.01.02.01 EXCAVACION DE ZANJAS P/CABLE NYY 0.75m x 0.60m (PROF.x ANCHO)
m 7.00 21.82 152.74 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 152.74 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.08.01.02.02 EXCAVACION DE HOYOS P/PUESTA A TIERRA Ø 1.00 m xx 2.70 ml
und 1.00 103.77 103.77 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 103.77 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.08.01.03 SUMINISTRO Y TENDIDO DE CABLES DE ENERGIA 892.67 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 892.67 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.08.01.03.01 CABLE DE ENERGIA DE Cu TIPO NYY DE 2-1 x 10 mm2; EN TUBOmPVC SAP 35.00 22.54 788.90 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 788.90 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.08.01.03.02 EXCAVACION DE HOYOS P/PUESTA A TIERRA Ø 1.00 m xx 2.70 ml
und 1.00 103.77 103.77 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 103.77 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
05.08.01.04 SUMINISTRO E INSTALACION DE EMPALMES , DERIVACION Y CRUCES 15,849.20 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 6,129.52 38.67% 38.67% 9,719.68 61.33% 100.00% 0.00 0.00% 100.00%
05.08.01.04.01 CRUCE DE CALLE C/TUB. DE CONCRETO CON (02) ORIFICIOS DE m Ø = 4" 20.00 792.46 15,849.20 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 6,129.52 38.67% 38.67% 9,719.68 61.33% 100.00% 0.00 0.00% 100.00%
05.08.01.05 SUMINISTRO E INSTALACION DE TABLEROS DE DISTRIBUCION 3,066.55 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 3,066.55 100.00% 100.00% 0.00 0.00% 100.00%
05.08.01.05.01 TABLERO DE DISTRIBUCION. und 1.00 1,865.66 1,865.66 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,865.66 100.00% 100.00% 0.00 0.00% 100.00%
05.08.01.05.02 PEDESTAL DE CONCRETO Y ENMALLADO PARA TABLERO GENERAL und 1.00 1,200.89 1,200.89 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,200.89 100.00% 100.00% 0.00 0.00% 100.00%
05.08.01.06 SUMINISTRO E INSTALACION DE PUESTA A TIERRA 757.14 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 757.14 100.00% 100.00% 0.00 0.00% 100.00%
05.08.01.06.01 PUESTA A TIERRA und 1.00 757.14 757.14 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 757.14 100.00% 100.00% 0.00 0.00% 100.00%
05.08.02 SUMINISTRO Y MONTAJE DE RED DE ALUMBRADO 14,127.74 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 14,127.74 100.00% 100.00% 0.00 0.00% 100.00%
05.08.02.01 MOVIMIENTO DE TIERRAS 1,178.78 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 1,178.78 100.00% 100.00% 0.00 0.00% 100.00%
05.08.02.01.01 EXCAVACION DE HOYO P/POSTE Ø 0.50m x 0.60m und 4.00 103.77 415.08 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 415.08 100.00% 100.00% 0.00 0.00% 100.00%
05.08.02.01.02 EXCAVACION DE ZANJAS P/CABLE NYY 0.75m x 0.60m (PROF.x ANCHO)
m 35.00 21.82 763.70 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 763.70 100.00% 100.00% 0.00 0.00% 100.00%
05.08.02.02 SUMINISTRO Y MONTAJE DE ESTRUCTURAS DE ALUMBRADO PUBLICO 10,736.96 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 10,736.96 100.00% 100.00% 0.00 0.00% 100.00%
05.08.02.02.01 SALIDA PARA ALUMBRADO DE ACCESO C/POSTE DE FIERRO DE und4" Ø x 4m CON
4.00 (02) FAROLAS
1,256.90 CON LAMPARA
5,027.60
DE VAPOR DE Na DE0.00
70 W SEGUN0.00%
DISEÑO 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 5,027.60 100.00% 100.00% 0.00 0.00% 100.00%
05.08.02.02.02 PEDESTAL DE CONCRETO PARA POSTE DE FAROLA und 24.00 237.89 5,709.36 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 5,709.36 100.00% 100.00% 0.00 0.00% 100.00%
05.08.02.03 SUMINISTRO Y TENDIDO DE CABLES DE ENERGIA 2,212.00 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 2,212.00 100.00% 100.00% 0.00 0.00% 100.00%
05.08.02.03.01 CABLE DE ENERGIA DE CU NYY 2-1X6 mm2, ALUMBRADO EXTERIORm 140.00 15.80 2,212.00 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 2,212.00 100.00% 100.00% 0.00 0.00% 100.00%
05.08.03 PRUEBAS 159.98 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 159.98 100.00% 100.00% 0.00 0.00% 100.00%
05.08.03.01 PRUEBAS ELECTRICAS 159.98 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 159.98 100.00% 100.00% 0.00 0.00% 100.00%
05.08.03.01.01 PRUEBAS DE AISLAMIENTO und 1.00 126.20 126.20 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 126.20 100.00% 100.00% 0.00 0.00% 100.00%
05.08.03.01.02 PRUEBAS DE PUESTA A TIERRA und 1.00 33.78 33.78 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00% 33.78 100.00% 100.00% 0.00 0.00% 100.00%
06 PLAN DE MANEJO AMBIENTAL - MONITOREO ARQUEOLOGICO 175,327.41 144,535.81 82.44% 82.44% 30,791.60 17.56% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
06.01 PLAN DE MANEJO AMBIENTAL Y MONITOREO ARQUEOLOGICO 144,535.81 144,535.81 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
06.01.01 PLAN DE MANEJO AMBIENTAL GLB 1.00 144,535.81 144,535.81 144,535.81 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
06.02 MONITOREO ARQUEOLOGICO 30,791.60 0.00 0.00% 0.00% 30,791.60 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
06.02.01 MONITOREO E INDUCCION ARQUEOLOGICA mes 3.00 7,737.20 23,211.60 0.00 0.00% 0.00% 23,211.60 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
06.02.02 INFORME MENSUAL DE MONITOREO ARQUEOLOGICO mes 3.00 1,000.00 3,000.00 0.00 0.00% 0.00% 3,000.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
06.02.03 INFORME FINAL DE MONITOREO ARQUEOLOGICO mes 1.00 4,580.00 4,580.00 0.00 0.00% 0.00% 4,580.00 100.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00% 0.00 0.00% 100.00%
COSTO DIRECTO C.D 6,106,499.61 378,072.36 6.19% 6.19% 384,466.60 6.30% 12.49% 1,121,854.63 18.37% 30.86% 1,447,956.98 23.71% 54.57% 1,559,851.42 25.54% 80.11% 861,379.93 14.11% 94.22% 249,584.99 4.09% 98.31% 103,332.72 1.69% 100.00%
GASTOS GENERALES G.G 10.00% 610,649.96 37,807.24 6.19% 6.19% 38,446.66 6.30% 12.49% 112,185.46 18.37% 30.86% 144,795.70 23.71% 54.57% 155,985.14 25.54% 80.11% 86,137.99 14.11% 94.22% 24,958.50 4.09% 98.31% 10,333.27 1.69% 100.00%
UTILIDAD UT. 10.00% 610,649.96 37,807.24 6.19% 6.19% 38,446.66 6.30% 12.49% 112,185.46 18.37% 30.86% 144,795.70 23.71% 54.57% 155,985.14 25.54% 80.11% 86,137.99 14.11% 94.22% 24,958.50 4.09% 98.31% 10,333.27 1.69% 100.00%
SUB TOTAL S_T 7,327,799.53 453,686.83 6.19% 6.19% 461,359.92 6.30% 12.49% 1,346,225.56 18.37% 30.86% 1,737,548.38 23.71% 54.57% 1,871,821.70 25.54% 80.11% 1,033,655.92 14.11% 94.22% 299,501.99 4.09% 98.31% 123,999.26 1.69% 100.00%
I.G.V. I.G.V 18.00% 1,319,003.92 81,663.63 6.19% 6.19% 83,044.79 6.30% 12.49% 242,320.60 18.37% 30.86% 312,758.71 23.71% 54.57% 336,927.91 25.54% 80.11% 186,058.06 14.11% 94.22% 53,910.36 4.09% 98.31% 22,319.87 1.69% 100.00%
TOTAL 8,646,803.45 535,350.46 6.19% 6.19% 544,404.71 6.30% 12.49% 1,588,546.16 18.37% 30.86% 2,050,307.08 23.71% 54.57% 2,208,749.61 25.54% 80.11% 1,219,713.98 14.11% 94.22% 353,412.35 4.09% 98.31% 146,319.13 1.69% 100.00%