Fisica 0.00 0.00 20843.575 20843.575 20843.575 20843.575 20843.575 20843.575 20843.575 20843.575 0.00 0.00 166748.60
COMPONENTE 01: ADECUADA
AO1 INFRAESTRUCTURA VIAL+ 80601 M3 Muy Alta 2023
2334951
Costeo S/ 0.00 S/ 0.00 S/ 40,563.27 S/ 12,084.19 S/ 184,550.01 S/ 62,591.39 S/ 177,476.69 S/ 106,116.31 S/ 38,166.69 S/ 28,196.37 S/ 0.00 S/ 0.00 649744.92
COMPONENTE 02: ADECUADA Fisica 0.00 0.00 0.00 583.894 583.894 583.894 583.894 583.89 0.00 0.00 0.00 0.00 2919.47
AO2 INFRAESTRUCTURA 80601 M2 Muy Alta 2023
PEATONAL+ 2334951
Costeo S/ 0.00 S/ 0.00 S/ 0.00 S/ 63,393.56 S/ 81,882.32 S/ 36,970.08 S/ 22,486.00 S/ 19,448.54 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 224180.50
Fisica 0.00 0.00 8.00 12.00 21.00 25.00 298.25 298.25 45.00 485.49 0.00 0.00 1192.98
COMPONENTE 03: ADECUADA
AO3 EVACUACIÓN DE AGUAS 80601 M2 Muy Alta 2023
PLUVIALES+ 2334951 Costeo S/ 0.00 S/ 0.00 S/ 2,167.78 S/ 1,884.42 S/ 1,919.78 S/ 0.00 S/ 1,764.78 S/ 6,278.54 S/ 10,462.42 S/ 12,227.20 S/ 0.00 S/ 0.00 36704.92
TOTAL S/ - S/ - S/ 42,731.05 S/ 77,362.17 S/ 268,352.11 S/ 99,561.47 S/ 201,727.47 S/ 131,843.39 S/ 48,629.11 S/ 40,423.57 S/ - S/ - S/ 910,630.34
PIM
RESUM. METRDO METRDO
P. P. METRDO
MAYORE METRAD METRDO EJECUT.
Item Descripción Und. METRADO EJECUTA MAYORE
S.M. O P.N,
P.N,
EXPT ACUMULD
SALDO. MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE TOTAL
DAS EXT S.M. EJECUT. ACUMULD.
EJECUT. MODF. .
01.01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA 3.60 x 4.80 m INCL. MARCO DE MADERA UND 1.00 1.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.02.02 ENERGIA ELECTRICA PROVISIONAL MES 8.00 8.00 0.00 8.00 0.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.20
01.02.02 EQUIPOS DE PROTECCION COLECTIVA GLB 1.00 1.00 0.00 1.00 0.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.05
01.02.03 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 1.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.04 CAPACITACIÒN EN SEGURIDAD Y SALUD GLB 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.05 RECURSOS PARA RESPUESTA ANTE EMERGENCIA GLB 1.00 1.00 0.00 1.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02
02.02 CORTE DE MATERIAL COMPACTADO A NIVEL SE SUB RASANTE M3 4,940.53 4940.53 0.00 4940.53 2228.92 0.00 22.69 0.00 88.21 88.21 88.21 88.21 2604.45
02.03 PERFILADO Y COMPACTADO DE LA SUB RASANTE M2 12,806.04 12806.04 0.00 12806.04 0.00 0.00 3193.87 854.25 1140.43 1140.43 1140.43 1140.43 8609.84
02.04 ELIMINACION DE MATERIAL EXCEDENTE M3K 22,479.41 22479.41 0.00 22479.41 10141.59 0.00 179.57 0.00 288.57 288.57 288.57 288.57 11475.45
03.01.02 EXTRACCION Y PREPARACION DE MATERIAL DE CANTERA M3 1,606.72 0.00 0.00 0.00 867.70 162.26 162.26 162.26 162.26 1516.72
03.01.03 CARGUIO Y TRANSPORTE DE AFIRMADO D>1 km M3K 5,623.52 0.00 0.00 0.00 3036.95 567.89 567.89 567.89 567.89 5308.52
03.01.04 CONFORMACION DE SUBBASE E=0.20M, EXTENDIDO, RIEGO Y COMPACTADO M2 8,033.60 8033.60 0.00 8033.60 0.00 0.00 0.00 2506.36 380.68 380.68 380.68 380.68 4029.08
03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL M2 1,195.96 0.00 0.00 0.00 0.00 286.75 286.75 286.75 286.75 1147.00
03.02.03 ACERO LISO DE Ø 1/2'' EN JUNTAS DE CONSTRUCCION Y CONTRACCION kg 3,645.68 3645.68 0.00 3645.68 0.00 0.00 0.00 0.00 492.51 492.51 492.51 492.51 1970.03
03.02.04 CONCRETO F'C=210 KG/CM2 M3 1,584.11 1584.11 0.00 1584.11 0.00 0.00 0.00 0.00 380.37 380.37 380.37 380.37 1521.48
03.02.05 JUNTAS ASFALTICAS M 3,898.48 3898.48 0.00 3898.48 0.00 0.00 0.00 0.00 555.29 555.29 555.29 555.29 2221.16
04 VEREDAS Y SARDINELES
04.01 VEREDAS 0.00 0.00 0.00
04.01.01 DEMOLICION DE VEREDA DE CONCRETO M2 1,719.74 614.82 1719.74 614.82 1104.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.02 EXCAVACION PARA VEREDAS M3 291.95 147 291.95 147.00 144.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.03 NIVELACION Y COMPACTADO TERRENO NORMAL (CON PLANCHA) M2 2,919.47 2919.47 0.00 2919.47 347.90 267.40 239.30 111.76 3.11 3.11 3.11 3.11 978.82
04.01.04 ELIMINACION DE MATERIAL EXCEDENTE M3K 9,153.18 2587.72 9153.18 2587.72 6565.46 740.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 740.62
04.01.05 EMPEDRADO PARA VEREDAS E=6" M2 2,919.47 97.48 2919.47 97.48 2821.99 303.90 311.40 239.30 14.28 0.00 0.00 0.00 0.00 868.88
04.01.06 ENCOFRADO Y DESENCOFRADO NORMAL M2 750.72 750.72 0.00 750.72 25.47 60.44 38.80 7.67 74.07 74.07 74.07 74.07 428.66
04.01.07 CONCRETO F'C=175 KG/CM2 M3 175.17 57.73 175.17 57.73 117.44 18.03 19.35 0.00 0.00 0.00 0.00 0.00 0.00 37.38
04.01.08 JUNTAS ASFALTICAS M 973.16 0.00 0.00 0.00 317.92 53.13 53.13 53.13 53.13 530.45
04.01.09 CURADO CON AGUA M2 973.16 908.36 0.00 0.00 0.00 317.92 53.13 53.13 53.13 53.13 530.45
04.02.02 ELIMINACION DE MATERIAL EXCEDENTE M3K 326.18 326.18 0.00 326.18 0.00 0.00 85.11 0.00 14.95 14.95 14.95 14.95 144.92
04.02.03 ENCOFRADO Y DESENCOFRADO NORMAL M2 1,033.97 1033.97 0.00 1033.97 25.47 87.74 58.20 128.82 6.33 6.33 6.33 6.33 325.54
04.02.04 CONCRETO F'C=175 KG/CM2 M3 155.10 155.10 0.00 155.10 7.04 22.80 14.40 9.70 0.70 0.70 0.70 0.70 56.74
04.02.05 JUNTAS ASFALTICAS M 229.77 229.77 0.00 229.77 0.00 0.00 0.00 34.85 32.59 32.59 32.59 32.59 165.22
04.02.06 CURADO CON AGUA M 229.77 109.17 229.77 109.17 120.60 0.00 0.00 0.00 34.85 32.59 32.59 32.59 32.59 165.22
05 DRENAJE PLUVIAL
05.01 CUNETA LATERAL 0.00 0.00 0.00
05.01.01 TRAZO Y REPLANTEO M 1,545.09 0.00 0.00 0.00 0.00 244.41 244.41 244.41 244.41 977.63
05.01.02 EXCAVACION MANUAL EN TERRENO NATURAL M3 231.76 0.00 0.00 0.00 0.00 16.18 16.18 16.18 16.18 64.73
05.01.03 ELIMINACION DE MATERIAL EXCEDENTE M3K 1,054.53 1054.53 0.00 1054.53 482.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 482.50
05.01.04 PERFILADO Y COMPACTADO DE CUNETA M2 772.55 772.55 0.00 772.55 0.00 0.00 419.50 0.00 88.26 88.26 88.26 88.26 772.55
05.01.05 ENCOFRADO Y DESENCOFRADO NORMAL M2 360.52 360.52 0.00 360.52 0.00 0.00 0.00 0.00 89.52 89.52 89.52 89.52 358.08
05.01.06 CONCRETO F'C=210 KG/CM2 M3 136.12 136.12 0.00 136.12 0.00 0.00 0.00 0.00 29.75 29.75 29.75 29.75 119.01
05.01.07 JUNTAS ASFALTICAS M 309.02 309.02 0.00 309.02 0.00 0.00 0.00 0.00 40.63 40.63 40.63 40.63 162.52
05.01.10 CORTE DE MATERIAL COMPACTADO A NIVEL SE SUB RASANTE EN CUNETAS M 309.02 291.17 309.02 291.17 17.85 0.00 0.00 0.00 0.00 40.63 40.63 40.63 40.63 162.52
05.02.02 EXCAVACION MANUAL EN TERRENO NATURAL M3 236.23 236.23 0.00 236.23 0.00 0.00 0.00 0.00 18.95 18.95 18.95 18.95 75.78
05.02.03 ELIMINACION DE MATERIAL EXCEDENTE M3K 1,074.84 1074.84 0.00 1074.84 0.00 0.00 0.00 0.00 268.71 268.71 268.71 268.71 1074.84
05.02.04 ACERO DE REFUERZO Fy=4200 kg/cm2 KG 8,073.67 8073.67 0.00 8073.67 0.00 0.00 0.00 0.00 1091.35 1091.35 1091.35 1091.35 4365.40
05.02.05 ENCOFRADO Y DESENCOFRADO NORMAL M2 1,453.71 0.00 0.00 0.00 0.00 246.22 246.22 246.22 246.22 984.88
05.02.06 CONCRETO F'C=210 KG/CM2 M3 97.85 97.85 0.00 97.85 0.00 0.00 0.00 0.00 7.82 7.82 7.82 7.82 31.28
05.02.07 JUNTAS ASFALTICAS M 288.88 288.88 0.00 288.88 0.00 0.00 0.00 0.00 68.01 68.01 68.01 68.01 272.02
05.02.08 TAPA DE CONCRETO ARMADO RENURADO ANCHO=0.80M M 687.93 687.93 0.00 687.93 0.00 0.00 0.00 0.00 98.24 98.24 98.24 98.24 392.98
05.03.02 EXCAVACION MANUAL EN TERRENO NATURAL M3 20.79 20.79 0.00 20.79 0.00 0.00 0.00 0.00 5.20 5.20 5.20 5.20 20.79
05.03.03 ELIMINACION DE MATERIAL EXCEDENTE M3K 94.59 94.59 0.00 94.59 0.00 0.00 0.00 0.00 23.65 23.65 23.65 23.65 94.59
05.03.04 ACERO DE REFUERZO Fy=4200 kg/cm2 KG 595.52 595.52 0.00 595.52 0.00 0.00 0.00 0.00 148.88 148.88 148.88 148.88 595.52
05.03.05 ENCOFRADO Y DESENCOFRADO NORMAL M2 92.40 0.00 0.00 0.00 0.00 23.10 23.10 23.10 23.10 92.40
05.03.06 CONCRETO F'C=210 KG/CM2 M3 9.01 0.00 0.00 0.00 0.00 2.25 2.25 2.25 2.25 9.01
05.03.07 SUMINISTRO, FABRICACION, PINTADO Y COLOCACION REJILLA DE PLATINA 2"x1/2" M 23.10 23.10 0.00 23.10 0.00 0.00 0.00 0.00 5.78 5.78 5.78 5.78 23.10
05.03.08 JUNTAS ASFALTICAS M 16.78 16.78 0.00 16.78 0.00 0.00 0.00 0.00 4.20 4.20 4.20 4.20 16.78
05.04.02 ELIMINACION DE MATERIAL EXCEDENTE M3K 19.66 19.66 0.00 19.66 0.00 0.00 0.00 0.00 4.92 4.92 4.92 4.92 19.66
05.04.03 ACERO DE REFUERZO Fy=4200 kg/cm2 KG 246.13 246.13 0.00 246.13 0.00 0.00 0.00 0.00 61.53 61.53 61.53 61.53 246.13
05.04.04 ENCOFRADO Y DESENCOFRADO NORMAL M2 43.56 43.56 0.00 43.56 0.00 0.00 0.00 0.00 10.82 10.82 10.82 10.82 43.26
05.04.05 CONCRETO F'C=210 KG/CM2 M3 4.32 4.32 0.00 4.32 0.00 0.00 0.00 0.00 1.07 1.07 1.07 1.07 4.28
06.02 COLOCACION DE GRASS M2 159.43 159.43 0.00 159.43 0.00 0.00 0.00 0.00 39.86 39.86 39.86 39.86 159.43
06.03 PLANTACION DE ARBUSTOS NATIVOS UND 108.00 108.00 0.00 108.00 0.00 0.00 0.00 0.00 27.00 27.00 27.00 27.00 108.00
07 SEÑALIZACIÓN
07.01 SEÑALIZACIÓN HORIZONTAL 0.00 0.00 0.00
07.01.01 DEMARCACION DE CRUCE DE VIAS M2 261.00 261.00 0.00 261.00 0.00 0.00 0.00 0.00 65.25 65.25 65.25 65.25 261.00
07.01.02 DEMARCACION LINEAL DE PAVIMENTO M 1,145.88 1145.88 0.00 1145.88 0.00 0.00 0.00 0.00 286.47 286.47 286.47 286.47 1145.88
07.01.03 PINTURA EN SARDINELES M 2,297.72 2297.72 0.00 2297.72 0.00 0.00 0.00 0.00 376.18 376.18 376.18 376.18 1504.74
07.02.02 SEÑALES REGLAMENTARIAS UND 30.00 30.00 0.00 30.00 0.00 0.00 0.00 0.00 7.50 7.50 7.50 7.50 30.00
07.02.03 SEÑALES PREVENTIVAS UND 20.00 20.00 0.00 20.00 0.00 0.00 0.00 0.00 5.00 5.00 5.00 5.00 20.00
08.01 NIVELACION DE TAPAS DE BUZONES UND 17.00 17.00 0.00 17.00 0.00 0.00 0.00 2.00 3.75 3.75 3.75 3.75 17.00
08.02 NIVELACION DE CAJA DE MEDIDORES DE AGUA UND 180.00 180.00 0.00 180.00 28.00 12.00 5.00 0.00 7.50 7.50 7.50 7.50 75.00
08.03 NIVELACION DE CAJA DE MEDIDORES DE DESAGUE UND 180.00 180.00 0.00 180.00 28.00 12.00 4.00 0.00 7.75 7.75 7.75 7.75 75.00
08.04 REPARACION DE CONEXIONES DOMICILIARIAS DE AGUA UND 180.00 180.00 0.00 180.00 28.00 12.00 5.00 0.00 5.25 5.25 5.25 5.25 66.00
08.05 REPARACION DE CONEXIONES DOMICILIARIAS DE DESAGUE UND 180.00 180.00 0.00 180.00 28.00 12.00 4.00 0.00 5.50 5.50 5.50 5.50 66.00
08.06 REUBICACION DE POSTES DE ENERGIA ELECTRICA UND 9.00 9.00 0.00 9.00 0.00 9.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00
08.07 LIMPIEZA FINAL DE OBRA M2 12,806.04 12806.04 0.00 12806.04 0.00 0.00 0.00 0.00 3201.51 3201.51 3201.51 3201.51 12806.04
BIENES S/ 416,429.10
C1 2 6 2 3 2 5 CD-B LENTES DE SEGURIDAD LUNA OSCURA UND S/.5.50 0 0 20 0 0 0 0 0 0 0 0 0 20 S/110.00
C1 2 6 2 3 2 5 CD-B GUANTES DE CUERO REFORZADO PAR S/.8.80 0 0 50 0 0 0 0 0 0 0 0 0 50 S/440.00
CASCO DE SEGURIDAD TIPO JOKEY CON BARBIQUEJO PARA PERSONAL S/300.00
C1 2 6 2 3 2 5 CD-B UND S/.10.00 0 0 30 0 0 0 0 0 0 0 0 0 30
OBRERO
CASCO DE SEGURIDAD TIPO JOKEY CON BARBIQUEJO PARA PERSONAL
C1 2 6 2 3 2 5 CD-B UND S/.8.80 0 0 5 0 0 0 0 0 0 0 0 0 5 S/44.00
OBRERO
C1 2 6 2 3 2 5 CD-B CASCO DE SEGURIDAD TIPO JOKEY CON BARBIQUEJO PARA PERSONAL OBRERO
UND S/.10.00 0 0 5 0 0 0 0 0 0 0 0 0 5 S/50.00
C/AZUL
C1 2 6 2 3 2 5 CD-B CORTAVIENTO PARA CASCO COLOR NARANJA UND S/.5.50 0 0 40 0 0 0 0 0 0 0 0 0 40 S/220.00
C1 2 6 2 3 2 5 CD-B GUANTES DE CUERO TIPO BADANA DE BUENA CALIDAD PAR S/.8.80 0 0 80 0 0 0 0 0 0 0 0 0 80 S/704.00
C1 2 6 2 3 2 5 CD-B BOTAS DE JEBE PUNTA ACERO PAR S/.44.00 0 0 20 0 0 0 0 0 0 0 0 0 20 S/880.00
C1 2 6 2 3 2 5 CD-B LENTES DE SEGURIDAD LUNA TRANSPARENTE UND S/.5.50 0 0 10 0 0 0 0 0 0 0 0 0 10 S/55.00
C1 2 6 2 3 2 5 CD-B MANDIL DE CUERO P/SOLDAR UND S/.30.20 0 0 1 0 0 0 0 0 0 0 0 0 1 S/30.20
C1 2 6 2 3 2 5 CD-B PROTECTOR DE OIDO TAMPON UND S/.3.00 0 0 30 0 0 0 0 0 0 0 0 0 30 S/90.00
C1 2 6 2 3 2 5 CD-B TRAJE TYBEX UND S/.13.00 0 0 20 0 0 0 0 0 0 0 0 0 20 S/260.00
C1 2 6 2 3 2 5 CD-B GUANTES DE JEBE PARA ALBAÑIL N°8 Y N°9 PAR S/.8.80 0 0 60 0 0 0 0 0 0 0 0 0 60 S/528.00
UNIFORME MAMELUCO DE 2 PIEZAS CAMISA Y PANTALON CON CINTA S/2,915.00
C1 2 6 2 3 2 5 CD-B UND S/.58.30 0 0 50 0 0 0 0 0 0 0 0 0 50
REFLECTIVA C/LOGO
C1 2 6 2 3 2 5 CD-B ZAPATOS DE SEGURIDAD PUNTA DE ACERO UND S/.60.00 0 0 50 0 0 0 0 0 0 0 0 0 50 S/3,000.00
CASCO DE SEGURIDAD TIPO JOKEY COLOR BLANCO CON PERILLA P/ S/232.00
C1 2 6 2 3 2 5 CD-B UND S/.58.00 0 0 4 0 0 0 0 0 0 0 0 0 4
PERSONAL TÉCNICO
C1 2 6 2 3 2 5 CD-B ZAPATO PUNTA DE ACERO PARA EL PERSONAL TÉCNICO PAR S/.380.00 0 0 6 0 0 0 0 0 0 0 0 0 6 S/2,280.00
C1 2 6 2 3 2 5 CD-B CASACA TERMICA P/PERSONAL TÉCNICO UND S/.140.00 0 0 6 0 0 0 0 0 0 0 0 0 6 S/840.00
LENTES DE SEGURIDAD CONTRA RAYOS LV COLOR OSCURO BUENA S/120.00
C1 2 6 2 3 2 5 CD-B PAR S/.20.00 0 0 6 0 0 0 0 0 0 0 0 0 6
CALIDAD
C1 2 6 2 3 2 5 CD-B GUANTES DE HILO CON PALMA DE LATEX PAR S/.7.00 0 0 0 0 60 0 0 0 0 0 0 0 60 S/420.00
ACEITE MONOGRADO PARA MOTOR DE EQUIPOS LIVIANOS X 1/4 MOVIL GLN S/120.00
C1 2 6 2 3 2 5 CD-B UND S/.20.00 0 0 2 2 2 0 0 0 0 0 0 0 6
20W-50 CUARTO DE GALON SUPER MIL ROW 50
C1 2 6 2 3 2 5 CD-B ACEITE DE DIFERENCIAL 85W - 140 BALDE S/.428.00 0 0 0 0 2 0 0 0 0 0 0 0 2 S/856.00
C1 2 6 2 3 2 5 CD-B FILTRO DE CAJA DE CAMBIOS COD.102291324-4-17 UND S/.92.00 0 0 0 0 1 0 0 0 0 0 0 0 1 S/92.00
C1 2 6 2 3 2 5 CD-B GRASA EP2 X 5 GLN UND S/.280.00 0 0 0 0 1 0 0 0 0 0 0 0 1 S/280.00
C1 2 6 2 3 2 5 CD-B FILTRO DE SERVO DIRECCION COD.349619 UND S/.187.00 0 0 0 0 1 0 0 0 0 0 0 0 1 S/187.00
C1 2 6 2 3 2 5 CD-B FILTRO DE ACEITE DE MOTOR COD. 21707133 UND S/.159.00 0 0 0 0 4 0 0 0 0 0 0 0 4 S/636.00
C1 2 6 2 3 2 5 CD-B FILTRO DE ACEITE DE MOTOR BY PASS COD. 21707132 UND S/.168.00 0 0 0 0 2 0 0 0 0 0 0 0 2 S/336.00
C1 2 6 2 3 2 5 CD-B FILTRO DE COMBUSTIBLE COD.20976003 UND S/.245.00 0 0 0 0 2 0 0 0 0 0 0 0 2 S/490.00
C1 2 6 2 3 2 5 CD-B FILTRO DE SEPARADOR DE AGUA COD.21380488 UND S/.343.00 0 0 0 0 2 0 0 0 0 0 0 0 2 S/686.00
C1 2 6 2 3 2 5 CD-B FILTRO SECADOR DE AIRE COD. 21620181 UND S/.510.00 0 0 0 0 1 0 0 0 0 0 0 0 1 S/510.00
C1 2 6 2 3 2 5 CD-B FILTRO DE AIRE PRIMARIO COD. 21041296 UND S/.499.00 0 0 0 0 1 0 0 0 0 0 0 0 1 S/499.00
C1 2 6 2 3 2 5 CD-B FILTRO DE AIRE SECUNDARIO COD. 21834199 UND S/.497.00 0 0 0 0 1 0 0 0 0 0 0 0 1 S/497.00
C1 2 6 2 3 2 5 CD-B BASE SOPORTE DE FILTRO DEPARADORDE AGUA UND S/.857.00 0 0 0 0 1 0 0 0 0 0 0 0 1 S/857.00
C1 2 6 2 3 2 5 CD-B RETROVISOR DERECHO, IZQUIERDOY LATERAL UND S/.788.00 0 0 0 0 1 0 0 0 0 0 0 0 1 S/788.00
C1 2 6 2 3 2 5 CD-B KIT DE REPARACION PARA CAJA DE DIRECCION VOLVO UND S/.336.00 0 0 0 0 1 0 0 0 0 0 0 0 1 S/336.00
C1 2 6 2 3 2 5 CD-B ACEITE 80W-90 X 5GLN. BALDE S/.428.00 0 0 0 0 1 0 0 0 0 0 0 0 1 S/428.00
C1 2 6 2 3 2 5 CD-B BORNES DE BATERIA UND S/.10.00 0 0 0 0 2 0 0 0 0 0 0 0 2 S/20.00
C1 2 6 2 3 2 5 CD-B DISCO DE CORTE DE MADERA DE 7" UND S/.20.00 0 0 15 0 0 0 0 0 0 0 0 0 15 S/300.00
C1 2 6 2 3 2 5 CD-B DISCO DE CORTE DE ACERO DE 7" UND S/.20.00 0 0 30 0 0 0 0 0 0 0 0 0 30 S/600.00
C1 2 6 2 3 2 5 CD-B DISCO DE CORTE DE CONCRETO DE 7" UND S/.26.50 0 0 4 0 0 0 0 0 0 0 0 0 4 S/106.00
C1 2 6 2 3 2 5 CD-B DISCO PARA PULIR CONCRETO DE 7" UND S/.110.00 0 0 3 0 0 0 0 0 0 0 0 0 3 S/330.00
C1 2 6 2 3 2 5 CD-B FILTRO DE CAJA DE CAMBIOS COD.102291324-4-17 UND S/.92.00 0 0 1 0 0 0 0 0 0 0 0 0 1 S/92.00
C1 2 6 2 3 2 5 CD-B PINTURA ESMALTE DE 1/4 (BLANCO Y ROJO) UND S/.20.00 0 0 4 0 0 0 0 0 0 0 0 0 4 S/80.00
C1 2 6 2 3 2 5 CD-B HOJA DE SIERRA N°24 UND S/.7.50 0 0 50 0 0 0 0 0 0 0 0 0 50 S/375.00
C1 2 6 2 3 2 5 CD-B PLASTICO DOBLE ANCHO ROLLO DE 100 M X 3M RLL S/.440.00 0 0 4 0 0 0 0 0 0 0 0 0 4 S/1,760.00
C1 2 6 2 3 2 5 CD-B REGLA DE ALUMINIO DE 1 1/2"X 4" X 6M UND S/.165.00 0 0 5 0 0 0 0 0 0 0 0 0 5 S/825.00
C1 2 6 2 3 2 5 CD-B TECNOPOR DE 1" PARA JUNTAS DE 1.2M X 2.4M UND S/.20.00 0 0 10 0 0 0 0 0 0 0 0 0 10 S/200.00
C1 2 6 2 3 2 5 CD-B LACA DESMOLDANTE PARA MADERA GLN S/.158.00 0 0 1 1 1 0 0 0 0 0 0 0 3 S/474.00
C1 2 6 2 3 2 5 CD-B ESCOBA CON MANGO DE MADERA UND S/.12.00 0 0 8 0 0 0 0 0 0 0 0 0 8 S/96.00
C1 2 6 2 3 2 5 CD-B MANGUERA DUPLEX REFORZADA DE 3/4" X 100 M RLL S/.195.00 0 0 1 0 0 0 0 0 0 0 0 0 1 S/195.00
C1 2 6 2 3 2 5 CD-B NIVEL DE INGENIERO INCL. ACCESORIOS UND S/.2,750.00 0 0 1 0 0 0 0 0 0 0 0 0 1 S/2,750.00
C1 2 6 2 3 2 5 CD-B BROCA DE 3/8" PARA MADERA UND S/.8.50 0 0 20 0 0 0 0 0 0 0 0 0 20 S/170.00
C1 2 6 2 3 2 5 CD-B TRAPO INDUSTRIAL KG S/.9.50 0 0 30 0 0 0 0 0 0 0 0 0 30 S/285.00
C1 2 6 2 3 2 5 CD-B CINTA TEFLON 19MM X 50 YARDAS UND S/.3.50 0 0 50 0 0 0 0 0 0 0 0 0 50 S/175.00
C1 2 6 2 3 2 5 CD-B BUGIA NGR HONDA UND S/.20.00 0 0 0 8 8 0 0 0 0 0 0 0 16 S/320.00
C1 2 6 2 3 2 5 CD-B ADITIVO REMOVEDOR DE OXIDO GLN S/.135.00 0 0 5 0 0 0 0 0 0 0 0 0 5 S/675.00
C1 2 6 2 3 2 5 CD-B BALDE DE 20LTS DE PLASTICO INCLUYE TAPA UND S/.9.00 0 0 0 0 10 0 0 0 0 0 0 0 10 S/90.00
C1 2 6 2 3 2 5 CD-B DISCO DE CORTE PARA ACERO Nº 14 UND S/.8.50 0 0 0 0 20 0 0 0 0 0 0 0 20 S/170.00
C1 2 6 2 3 2 5 CD-B REGLA DE ALUMINIO DE 1 1/2´´ X 4´´ X 6MTS, E=1.5MM (PESADO) UND S/.210.00 0 0 0 0 3 0 0 0 0 0 0 0 3 S/630.00
C1 2 6 2 3 2 5 CD-B CLAVO PARA MADERA C/C DE 4" KG S/.6.20 0 0 0 0 60 0 0 0 0 0 0 0 60 S/372.00
C1 2 6 2 3 2 4 CD-B DIESEL B5-S50 (PETROLEO) GLN S/.17.59 0 0 0 0 750 0 0 0 0 0 0 0 750 S/13,192.50
C1 2 6 2 3 2 4 CD-B GASOLINA DE 90 OCT GLN S/.19.00 0 0 0 0 30 0 0 0 0 0 0 0 30 S/570.00
C1 2 6 2 3 2 5 CD-B ACERO CORRUGADO FY= 4200 KG/CM2 DE 6MM VRLL S/.10.70 0 0 0 0 3,750 0 0 0 0 0 0 0 3,750 S/40,125.00
C1 2 6 2 3 2 5 CD-B ACERO CORRUGADO FY= 4200 KG/CM2 DE 3/4" VRLL S/.104.00 0 0 0 0 20 0 0 0 0 0 0 0 20 S/2,080.00
C1 2 6 2 3 2 4 CD-B ACERO LISO DE 1/2 VRLL S/.49.00 0 0 0 0 0 0 0 0 0 0 0 0 0 S/0.00
C1 2 6 2 3 2 5 CD-B ACERO CORRUGADO FY= 4200 KG/CM2 DE 1/2" VRLL S/.48.00 0 0 0 0 40 0 60 0 0 0 0 0 100 S/4,800.00
C1 2 6 2 3 2 5 CD-B ACERO CORRUGADO FY= 4200 KG/CM2 DE 3/8" VRLL S/.33.00 0 0 0 0 0 0 0 0 0 0 0 0 0 S/0.00
C1 2 6 2 3 2 4 CD-B ALAMBRE N° 8 KG S/.6.60 0 0 100 0 0 0 0 0 0 0 0 0 100 S/660.00
C1 2 6 2 3 2 5 CD-B ALAMBRE N° 16 KG S/.7.70 0 0 100 0 0 0 0 0 0 0 0 0 100 S/770.00
C1 2 6 2 3 2 4 CD-B CLAVO P/MADERA CON CABEZA DE 1" KG S/.9.00 0 0 0 0 0 0 0 0 0 0 0 0 0 S/0.00
C1 2 6 2 3 2 4 CD-B CLAVO P/MADERA CON CABEZA DE 1 1/2" KG S/.7.60 0 0 30 0 0 0 0 0 0 0 0 0 30 S/228.00
C1 2 6 2 3 2 5 CD-B CLAVO P/MADERA CON CABEZA DE 2" KG S/.9.00 0 0 0 0 0 0 0 0 0 0 0 0 0 S/0.00
C1 2 6 2 3 2 5 CD-B CLAVO P/MADERA CON CABEZA DE 3" KG S/.6.60 0 0 120 0 0 0 0 0 0 0 0 0 120 S/792.00
C1 2 6 2 3 2 4 CD-B CLAVO P/MADERA CON CABEZA DE 4" KG S/.6.60 0 0 30 0 0 0 0 0 0 0 0 0 30 S/198.00
C1 2 6 2 3 2 4 CD-B CODO CPVC SAP C-10 DE 1/2" DE 90° UND S/.3.50 0 0 20 0 0 0 0 0 0 0 0 0 20 S/70.00
C1 2 6 2 3 2 5 CD-B LISTONES DE MADERA CORRIENTE 2"X2"X10P UND S/.20.00 0 0 0 0 0 0 0 0 0 0 0 0 0 S/0.00
C1 2 6 2 3 2 4 CD-B LISTONES DE MADERA CORRIENTE 2"X3"X10P UND S/.28.50 0 0 80 0 0 0 0 0 0 0 0 0 80 S/2,280.00
C1 2 6 2 3 2 5 CD-B LISTONES DE MADERA CORRIENTE 2"X3"X10P UND S/.23.00 0 0 0 0 50 0 0 0 0 0 0 0 50 S/1,150.00
C1 2 6 2 3 2 4 CD-B TRIPLAY FENÓLICO DOBLE FILM DE 18MM X 1.22 M X 2.44 M PLN S/.138.00 0 0 30 0 0 0 0 0 0 0 0 0 30 S/4,140.00
C1 2 6 2 3 2 4 CD-B MADERA NACIONAL P/ENCOFRAD - CARP 1 1/2´´X8´´X10P UND S/.48.00 0 0 20 0 0 0 0 0 0 0 0 0 20 S/960.00
C1 2 6 2 3 2 5 CD-B MADERA NACIONAL P/ENCOFRAD - CARP 1 1/2´´X8´´X10P UND S/.43.00 0 0 0 0 20 0 0 0 0 0 0 0 20 S/860.00
C1 2 6 2 3 2 4 CD-B MATERIAL LASTRE PARA BASE M3 S/.46.00 0 0 0 0 1,500 0 0 0 0 0 0 0 1,500 S/69,000.00
C1 2 6 2 3 2 4 CD-B LIJAR PARA FIERRO N° 80 PLGO S/.3.20 0 0 25 0 0 0 0 0 0 0 0 0 25 S/80.00
C1 2 6 2 3 2 4 CD-B PINTURA ESMALTE TRAFICO COLOR AMARILLO GLN S/.66.00 0 0 0 0 0 0 0 0 0 0 0 0 0 S/0.00
C1 2 6 2 3 2 5 CD-B PINTURA ESMALTE TRAFICO COLOR BLANCO GLN S/.66.00 0 0 0 0 0 0 0 0 0 0 0 0 0 S/0.00
C1 2 6 2 3 2 4 CD-B ROLLIZOS DE 5´´ X 6MTS UND S/.40.00 0 0 5 0 0 0 0 0 0 0 0 0 5 S/200.00
C1 2 6 2 3 2 4 CD-B ROLLIZOS DE 6´´ X 8MTS UND S/.110.00 0 0 0 0 0 0 10 0 0 0 0 0 10 S/1,100.00
C1 2 6 2 3 2 5 CD-B LEÑA QUINTAL S/.18.00 0 0 0 0 0 0 10 0 0 0 0 0 10 S/180.00
C1 2 6 2 3 2 5 CD-B THIÑER GLN S/.24.00 0 0 0 0 0 0 0 0 0 0 0 0 0 S/0.00
C1 2 6 2 3 2 4 CD-B TUBO DE 1/2" PVC SAP C-10 C/R BUENA CALIDAD UND S/.15.50 0 0 10 0 0 0 0 0 0 0 0 0 10 S/155.00
C1 2 6 2 3 2 4 CD-B ESPATULA DE 4" UND S/.10.00 0 0 0 0 0 0 0 0 0 0 0 0 0 S/0.00
C1 2 6 2 3 2 5 CD-B BROCHA UND S/.30.00 0 0 0 0 0 0 0 0 0 0 0 0 0 S/0.00
C1 2 6 2 3 2 4 CD-B ADITIVO CURADOR DE CONCRETO GLN S/.35.00 0 0 0 0 305 305 307 0 0 0 0 0 917 S/32,095.00
C1 2 6 2 3 2 5 CD-B CONCRETO PRE MEZCLADO FC=210KG/CM2 M3 S/.347.71 0 0 0 0 0 0 304 186 0 0 0 0 490 S/170,550.90
C1 2 6 2 3 2 4 CD-B ADHESIVO EPOXICO DE ALTA RESISTENCIA PARA CONCRETO JUEGO/ 5KG UND S/.550.00 0 0 0 0 0 0 1 0 0 0 0 0 1 S/550.00
C1 2 6 2 3 2 4 CD-B PINTURA P/TRÁFICO C/AMARILLO GLN S/.53.10 0 0 0 0 0 0 60 0 0 0 0 0 60 S/3,186.00
C1 2 6 2 3 2 5 CD-B PINTURA P/TRÁFICO C/BLANCO GLN S/.53.10 0 0 0 0 0 0 20 0 0 0 0 0 20 S/1,062.00
C1 2 6 2 3 2 4 CD-B RESPIRADOR DOBLE VIA OV/P95 UND S/.199.00 0 0 0 0 0 0 6 0 0 0 0 0 6 S/1,194.00
C1 2 6 2 3 2 4 CD-B MASCARILLA RESPIRADOR CON VALVULA N95-8210V CAJA/10UND CAJA S/.129.00 0 0 0 0 0 0 2 0 0 0 0 0 2 S/258.00
C1 2 6 2 3 2 4 CD-B CINTA DE SEGURIDADx200M (Color Rojo) ROLLO S/.30.00 0 0 0 0 0 0 2 0 0 0 0 0 2 S/60.00
C1 2 6 2 3 2 5 CD-B DISCO DE CORTE DE CONCRETO DE 7” UND S/.32.00 0 0 0 0 0 0 2 0 0 0 0 0 2 S/64.00
C1 2 6 2 3 2 4 CD-B TUBO PVC-U TIPO: ELECTRICO DIAMETRO NOMINAL DE 5/8” x 3mts UND S/.4.72 0 0 0 0 0 0 240 0 0 0 0 0 240 S/1,132.80
C1 2 6 2 3 2 4 CD-B TUBO PVC-U TIPO: ELECTRICO DIAMETRO NOMINAL DE 1” x 3mts UND S/.9.44 0 0 0 0 0 0 170 0 0 0 0 0 170 S/1,604.80
C1 2 6 2 3 2 4 CD-B GEOTEXTIL PARA CURADO DE CONCRETO x 100mts ROLLO S/.2,900.00 0 0 0 0 0 0 1 0 0 0 0 0 1 S/2,900.00
C1 2 6 2 3 2 4 CD-B GUANTES DE JEBE UND S/.13.00 0 0 0 0 0 0 20 0 0 0 0 0 20 S/260.00
C1 2 6 2 3 2 5 CD-B GUANTES DE HILO CON PALMA DE LÁTEX UND S/.11.00 0 0 0 0 0 0 30 0 0 0 0 0 30 S/330.00
C1 2 6 2 3 2 4 CD-B BROCHA DE 3” UND S/.20.00 0 0 0 0 0 0 5 0 0 0 0 0 5 S/100.00
C1 2 6 2 3 2 4 CD-B THINNER GLN S/.29.00 0 0 0 0 0 0 50 0 0 0 0 0 50 S/1,450.00
C1 2 6 2 3 2 5 CD-B TAPAS PARA VÁLVULA DE F°F° (0.23x0.30m) UND S/.35.00 0 0 0 0 0 0 5 0 0 0 0 0 5 S/175.00
C1 2 6 2 3 2 5 CD-B LIJAR N°80 (Rollo x 50mts) ROLLO S/.770.00 0 0 0 0 0 0 2 0 0 0 0 0 2 S/1,540.00
C1 2 6 2 3 2 4 CD-B ACEITE DE DIFERENCIAL 85W - 140 BALDE S/.428.00 0 0 0 0 0 2 0 0 0 0 0 0 2 S/856.00
C1 2 6 2 3 2 4 CD-B FILTRO DE CAJA DE CAMBIOS COD.102291324-4-17 UND S/.92.00 0 0 0 0 0 1 0 0 0 0 0 0 1 S/92.00
C1 2 6 2 3 2 5 CD-B GRASA EP2 X 5 GLN BALDE S/.280.00 0 0 0 0 0 1 0 0 0 0 0 0 1 S/280.00
C1 2 6 2 3 2 4 CD-B FILTRO DE SERVO DIRECCION COD.349619 UND S/.187.00 0 0 0 0 0 1 0 0 0 0 0 0 1 S/187.00
C1 2 6 2 3 2 5 CD-B FILTRO DE ACEITE DE MOTOR COD. 21707133 UND S/.159.00 0 0 0 0 0 4 0 0 0 0 0 0 4 S/636.00
C1 2 6 2 3 2 4 CD-B FILTRO DE ACEITE DE MOTOR BY PASS COD. 21707132 UND S/.168.00 0 0 0 0 0 2 0 0 0 0 0 0 2 S/336.00
C1 2 6 2 3 2 4 CD-B FILTRO DE COMBUSTIBLE COD.20976003 UND S/.245.00 0 0 0 0 0 2 0 0 0 0 0 0 2 S/490.00
C1 2 6 2 3 2 5 CD-B FILTRO DE SEPARADOR DE AGUA COD.21380488 UND S/.343.00 0 0 0 0 0 2 0 0 0 0 0 0 2 S/686.00
C1 2 6 2 3 2 4 CD-B FILTRO SECADOR DE AIRE COD. 21620181 UND S/.510.00 0 0 0 0 0 1 0 0 0 0 0 0 1 S/510.00
C1 2 6 2 3 2 4 CD-B FILTRO DE AIRE PRIMARIO COD. 21041296 UND S/.499.00 0 0 0 0 0 1 0 0 0 0 0 0 1 S/499.00
C1 2 6 2 3 2 4 CD-B FILTRO DE AIRE SECUNDARIO COD. 21834199 UND S/.497.00 0 0 0 0 0 1 0 0 0 0 0 0 1 S/497.00
C1 2 6 2 3 2 5 CD-B BASE SOPORTE DE FILTRO DEPARADORDE AGUA UND S/.857.00 0 0 0 0 0 1 0 0 0 0 0 0 1 S/857.00
C1 2 6 2 3 2 4 CD-B RETROVISOR DERECHO, IZQUIERDOY LATERAL UND S/.788.00 0 0 0 0 0 1 0 0 0 0 0 0 1 S/788.00
C1 2 6 2 3 2 4 CD-B KIT DE REPARACION PARA CAJA DE DIRECCION VOLVO UND S/.336.00 0 0 0 0 0 1 0 0 0 0 0 0 1 S/336.00
C1 2 6 2 3 2 5 CD-B ACEITE 80W-90 X 5GLN. BALDE S/.428.00 0 0 0 0 0 1 0 0 0 0 0 0 1 S/428.00
C1 2 6 2 3 2 5 CD-B BORNES DE BATERIA UND S/.10.00 0 0 0 0 0 2 0 0 0 0 0 0 2 S/20.00
C1 2 6 2 3 2 4 CD-B ANGULAR DE 1"X1"X6M, E=2MM UND S/.28.50 0 0 0 0 0 10 0 0 0 0 0 0 10 S/285.00
C1 2 6 2 3 2 4 CD-B ANGULAR DE 2 1/2" X 2 1/2" X 6M, E=3.16MM UND S/.173.00 0 0 0 0 0 3 0 0 0 0 0 0 3 S/519.00
C1 2 6 2 3 2 5 CD-B ELECTRODO PUNTO AZUL DE 1/8" KG S/.20.20 0 0 0 0 0 60 0 0 0 0 0 0 60 S/1,212.00
C1 2 6 2 3 2 4 CD-B ELECTRODO SUPERCITO DE 1/8" KG S/.21.50 0 0 0 0 0 30 0 0 0 0 0 0 30 S/645.00
C1 2 6 2 3 2 5 CD-B PLATINA DE ACERO DE 1/2" X 2" X 6M UND S/.201.00 0 0 0 0 0 38 0 0 0 0 0 0 38 S/7,638.00
C1 2 6 2 3 2 5 CD-B PLATINA DE 2"X1/8"X6M UND S/.49.00 0 0 0 0 0 0 8 0 0 0 0 0 8 S/392.00
PROBETAS CILINDRICAS METALICAS P/BRIQUETAS DE CONCRETO S/840.00
C1 2 6 2 3 2 5 CD-B UND S/.280.00 0 0 0 0 0 0 3 0 0 0 0 0 3
(BRIQUETERAS)
C1 2 6 2 3 2 5 CD-B ADQUISICION DE CATEL DE OBRA UND S/.850.00 0 0 0 0 0 1 0 0 0 0 0 0 1 S/850.00
ARCHIVADOR DE CARTON CON PALANCA LOMO ANCHO TAMAÑO MEDIO S/54.00
C1 2 6 2 3 2 4 GG-B UND S/.9.00 0 0 6 0 0 0 0 0 0 0 0 0 6
OFICIO
C1 2 6 2 3 2 4 GG-B ARCHIVADOR TIPO PALANCA LOMO ANCHO PARA FORMATO A-4 UND S/.15.00 0 0 9 0 0 0 0 0 0 0 0 0 9 S/135.00
C1 2 6 2 3 2 5 GG-B BINDER CLIPS 15/8 CAJA S/.10.00 0 0 2 0 0 0 0 0 0 0 0 0 2 S/20.00
C1 2 6 2 3 2 4 GG-B CD BLANCO INCLUIDO ESTUCHE UND S/.1.50 0 0 25 0 0 0 0 0 0 0 0 0 25 S/37.50
C1 2 6 2 3 2 4 GG-B CINTA ADHESIVA DE 3/4" 72YARDAS UND S/.5.50 0 0 3 0 0 0 0 0 0 0 0 0 3 S/16.50
C1 2 6 2 3 2 4 GG-B CLIPS TIPO MARIPOSA DE 45MM CAJA S/.5.00 0 0 2 0 0 0 0 0 0 0 0 0 2 S/10.00
C1 2 6 2 3 2 5 GG-B CLIPS METALICO PEQUEÑO CAJA S/.2.50 0 0 2 0 0 0 0 0 0 0 0 0 2 S/5.00
C1 2 6 2 3 2 4 GG-B CORRECTOR LIQUIDO TIPO LAPIZ DE 9ML UND S/.3.50 0 0 6 0 0 0 0 0 0 0 0 0 6 S/21.00
C1 2 6 2 3 2 4 GG-B CUADERNO CON ESPIRAL DE 100 HOJAS UND S/.9.50 0 0 8 0 0 0 0 0 0 0 0 0 8 S/76.00
C1 2 6 2 3 2 4 GG-B CUADERNO DE OBRA AUTOCOPIATIVO DE 100 HOJAS 1X 3 COPIAS UND S/.70.00 0 0 2 0 0 0 0 0 0 0 0 0 2 S/140.00
C1 2 6 2 3 2 5 GG-B FOLDER MANILA A-4 (INCLUYE FASTENER) PQT S/.16.00 0 0 2 0 0 0 0 0 0 0 0 0 2 S/32.00
C1 2 6 2 3 2 4 GG-B FOLIADOR METALICO AUTOMATICO DE 6 DIGITOS (BUENA CALIDAD) UND S/.70.00 0 0 1 0 0 0 0 0 0 0 0 0 1 S/70.00
C1 2 6 2 3 2 5 GG-B GRAPAS 26/6 X 5000 UND CAJA S/.6.00 0 0 1 0 0 0 0 0 0 0 0 0 1 S/6.00
C1 2 6 2 3 2 4 GG-B BOLIGRAFO (LAPICERO) COLOR AZUL NRO. 0.70 CAJA S/.38.00 0 0 1 0 0 0 0 0 0 0 0 0 1 S/38.00
BOLÍGRAFO (LAPICERO) TINTA LIQUIDA PUNTA FINA 0.6 MM C/AZUL, NEGRO S/30.00
C1 2 6 2 3 2 4 GG-B CAJA S/.5.00 0 0 6 0 0 0 0 0 0 0 0 0 6
Y ROJO
C1 2 6 2 3 2 4 GG-B LIBRETA TOPOGRÁFICA UND S/.9.00 0 0 3 0 0 0 0 0 0 0 0 0 3 S/27.00
C1 2 6 2 3 2 5 GG-B POSIT DE COLORES 3X3 X 500 UNIDADES PQT S/.15.00 0 0 4 0 0 0 0 0 0 0 0 0 4 S/60.00
C1 2 6 2 3 2 4 GG-B PAPEL BOND COLOR MILL S/.90.00 0 0 1 0 0 0 0 0 0 0 0 0 1 S/90.00
C1 2 6 2 3 2 4 GG-B PAPEL BOND DE 75GR. TAMAÑO A4 HOJAS DE COLOR BLANDO MILL S/.43.00 0 0 10 0 0 0 0 0 0 0 0 0 10 S/430.00
C1 2 6 2 3 2 4 GG-B PARTES DIARIO DE EQUIPO (MAQUINARIA X 50HOJAS AUTOCOPIABLES 1X3) TAL S/.23.00 0 0 6 0 0 0 0 0 0 0 0 0 6 S/138.00
C1 2 6 2 3 2 5 GG-B PLUMON RESALTADOR (COLOR: AMARILLO, ANARANJADO Y VERDE) UND S/.3.50 0 0 12 0 0 0 0 0 0 0 0 0 12 S/42.00
C1 2 6 2 3 2 5 GG-B NOTA DE ENTRADA DE 50 HOJAS (1ORIGINAL + 3 AUTOCOPIAS) UND S/.23.00 0 0 2 0 0 0 0 0 0 0 0 0 2 S/46.00
C1 2 6 2 3 2 4 GG-B NOTA DE SALIDA DE 50 HOJAS (1ORIGINAL + 3 AUTOCOPIAS) UND S/.23.00 0 0 6 0 0 0 0 0 0 0 0 0 6 S/138.00
C1 2 6 2 3 2 4 GG-B SOBRE MANILA A4 (PAQUETE X 50 UNIDADES) PQT S/.25.00 0 0 1 0 0 0 0 0 0 0 0 0 1 S/25.00
C1 2 6 2 3 2 4 GG-B TIJERA DE OFICINA UNIVERSAL 8 PULGADAS UND S/.7.00 0 0 2 0 0 0 0 0 0 0 0 0 2 S/14.00
C1 2 6 2 3 2 5 GG-B TINTA LÍQUIDA PARA SELLO AUTOMÁTICO COLOR NEGRO UND S/.17.00 0 0 2 0 0 0 0 0 0 0 0 0 2 S/34.00
C1 2 6 2 3 2 4 GG-B TINTA PARA IMPRESORA (NEGRO, CIAN, MAGENTA Y AMARILLO) LTR S/.100.00 0 0 4 0 0 0 0 0 0 0 0 0 4 S/400.00
C1 2 6 2 3 2 5 GG-B CUTER GRANDE UND S/.3.50 0 0 1 0 0 0 0 0 0 0 0 0 1 S/3.50
C1 2 6 2 3 2 4 GG-B PAPEL LUSTRE COLOR PLG S/.0.60 0 0 14 0 0 0 0 0 0 0 0 0 14 S/8.40
C1 2 6 2 3 2 4 GG-B GOMA EN BARRA DE 40GR UND S/.8.00 0 0 3 0 0 0 0 0 0 0 0 0 3 S/24.00
C1 2 6 2 3 2 4 GG-B SELLO AUTOMÁTICO SEGÚN MODELO UND S/.27.00 0 0 2 0 0 0 0 0 0 0 0 0 2 S/54.00
C1 2 6 2 3 2 5 GG-B REGLA METÁLICA UND S/.8.00 0 0 2 0 0 0 0 0 0 0 0 0 2 S/16.00
SERVICIOS
C1 2 6 2 3 2 6 CD-S HERRAMIENTAS MANUALES %MO 0 0 0 0 0 0 0 0 0 0 0 0 0 S/0.00
C1 2 6 2 3 2 6 CD-S TROZADORA DE METAL ELECTRICO DE 14" UND S/.1,000.00 0 0 0 0 0 0 0 0 0 0 0 0 0 S/0.00
C1 2 6 2 3 2 6 CD-S CARGADOR SOBRE LLANTAS DE 125-155 HP 3.5 yd3 HM S/.104.75 0 0 0 15 15 15 0 0 0 0 0 0 45 S/4,713.75
C1 2 6 2 3 2 6 CD-S TRACTOR DE ORUGAS DE 190-240 HP HM S/.135.59 0 0 0 10 10 10 0 0 0 0 0 0 30 S/4,067.70
C1 2 6 2 3 2 6 CD-S CAMION VOLQUETE 15 M3 HM S/.101.69 0 0 0 15 15 15 0 0 0 0 0 0 45 S/4,576.05
C1 2 6 2 3 2 6 CD-S MOTONIVELADORA DE 130-135 HP HM S/.152.54 0 0 0 10 10 10 0 0 0 0 0 0 30 S/4,576.20
C1 2 6 2 3 2 6 CD-S RODILLO LISO VIBR AUTOP 101-135HP 10-12T HM S/.127.12 0 0 0 12 12 12 0 0 0 0 0 0 36 S/4,576.32
C1 2 6 2 3 2 6 CD-S CAMION CISTERNA 4X2 (AGUA) 1,500 GAL HM S/.118.64 0 0 0 12 12 12 0 0 0 0 0 0 36 S/4,271.04
C1 2 6 2 3 2 6 CD-S FLETE TERRESTRE GLB S/.2,500.00 0 0 0 0 1 0 0 0 0 0 0 0 1 S/2,500.00
C1 2 6 2 3 2 6 CD-S SC DENSIDAD DE CAMPO UND S/.30.00 0 0 25 0 0 0 0 0 0 0 0 0 25 S/750.00
C1 2 6 2 3 2 6 CD-S SC RUPTURA DE BRIQUETAS UND S/.25.00 0 0 0 0 0 0 0 60 0 0 0 0 60 S/1,500.00
C1 2 6 2 3 2 6 CD-S SC ESTUDIO DE SUELOS GLB S/.1,100.00 0 0 1 0 0 0 0 0 0 0 0 0 1 S/1,100.00
C1 2 6 2 3 2 6 CD-S SC ESTUDIO DE CANTERA DE MATERIAL BASE GLB S/.350.00 0 0 1 0 0 0 0 0 0 0 0 0 1 S/350.00
C1 2 6 2 3 2 6 CD-S SC DISEÑO DE MEZCLAS DE CONCRETO GLB S/.480.00 0 0 1 0 0 0 0 0 0 0 0 0 1 S/480.00
PERSONAL S/ 36,027.28
C3 2 6 2 3 2 4 CD-P OPERARIO mes S/.2,256.88 0 0 0 0 0 0 0 2 3 3 0 0 8 S/18,055.04
C3 2 6 2 3 2 4 CD-P OFICIAL mes S/.1,927.00 0 0 0 0 0 0 0 0 1 1 0 0 2 S/3,854.00
C3 2 6 2 3 2 4 CD-P PEON mes S/.1,764.78 0 0 1 1 1 0 1 1 1 2 0 0 8 S/14,118.24
BIENES S/ 677.64
C3 2 6 2 3 2 5 CD-B ANGULAR DE FIERRO 2X1/4X6M E=3.16MM VAR S/.90.00 0 0 0 0 0 0 0 0 0 0 0 0 0 S/0.00
C3 2 6 2 3 2 5 CD-B PLATINA DE E= 1/2"X2"X6M VAR S/.260.00 0 0 0 0 0 0 0 0 0 0 0 0 0 S/0.00
C3 2 6 2 3 2 5 CD-B CODO DE 1/2" PVC SAP C-10 UND S/.2.00 0 0 0 0 0 0 0 0 0 0 0 0 0 S/0.00
C3 2 6 2 3 2 5 CD-B UNION REPARACION DE 1/2" PVC SAP C-10 UND S/.13.40 0 0 20 0 0 0 0 0 0 0 0 0 20 S/268.00
C3 2 6 2 3 2 5 CD-B LLAVE DE PASO CORPORATION DE 1/2" UND S/.13.50 0 0 10 0 0 0 0 0 0 0 0 0 10 S/135.00
C3 2 6 2 3 2 5 CD-B TUBO DE 1/2" PVC SAP C-10 C/R BUENA CALIDAD UND S/.15.50 0 0 0 0 10 0 0 0 0 0 0 0 10 S/155.00
TUBO: MATERIAL: PVC-U TIPO:ELECTRICO DIAMETRO NOMINAL:3/4 ESPESOR 1.2MM
C3 2 6 2 3 2 5 CD-B LONGITUD: 3M RIGIDEZ NOMINAL: CLASE LIVIANA ENPALME: SIMPLE PRESION.
UND S/.12.00 0 0 0 10 0 0 0 0 0 0 0 0 10
S/119.64
CUADRO RESUMEN
COSTOS DIRECTOS
2 6 2 3 2 4 CD-P PERSONAL GLB 1 41,822.51 46,336.27 62,747.35 46,828.37 60,982.57 46,047.79 48,629.11 40,423.57 S/ 393,817.54
2 6 2 3 2 5 CD-B BIENES GLB 1 58,147.20 40,587.64 149,265.50 29,322.00 137,707.42 64,847.06 0.00 0.00 S/ 479,876.82
2 6 2 3 2 6 CD-S SERVICIO GLB 1 3,930.00 8,927.02 11,427.02 8,927.02 0.00 1,500.00 0.00 0.00 S/ 34,711.06
COSTO DIRECTO 103,899.71 95,850.93 223,439.87 85,077.39 198,689.99 112,394.85 48,629.11 40,423.57 S/ 908,405.42
COSTOS INDIRECTOS
SUB GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Centro de Costo
CÓDIGO DE P.U
N° Ord. Detalle Especifica Descripcion Unidad de Medida Programación de Acciones - Cantidad - FISICA
CUBSO (Referencial)
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC CANT. TOTAL
TOTAL (S/)
1º 2º 3º 4º 5º 6º 7º 8º 9º 10º 11º 12º
GASTOS GENERALES 7,828.00 10,475.00 10,475.00 10,475.00 10,475.00 10,475.00 10,475.00 10,475.00 10,475.00 S/ 93,852.90
2 6 2 3 2 4 GG-P PERSONAL GLB 1 7,828.00 10,475.00 10,475.00 10,475.00 10,475.00 10,475.00 10,475.00 10,475.00 10,475.00 S/ 91,628.00
2 6 2 3 2 5 GG-B BIENES GLB 1 2,224.90 S/ 2,224.90
2 6 2 3 2 6 GG-S SERVICIO GLB 1 S/ -
GASTOS DE SUPERVISION 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 S/ 40,077.00
2 6 8 1 4 1 GS-P PERSONAL GLB 1 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 S/ 40,077.00
2 6 8 1 4 2 GS-B BIENES GLB 1 S/ -
2 6 8 1 4 3 GS-S SERVICIO GLB 1 S/ -
GASTOS DE LIQUIDACIÓN 16,520.15 S/ 16,520.15
2 6 2 3 2 4 GG-P PERSONAL GLB 1 16,520.15 S/ 16,520.15
2 6 2 3 2 5 GG-B BIENES GLB 1 S/ -
2 6 2 3 2 6 GG-S SERVICIO GLB 1 S/ -
PLAN DE MONITOREO ARQUEOLÓGICO S/ -
2 6 8 1 4 1 GS-P PERSONAL GLB 1 S/ -
2 6 8 1 4 2 GS-B BIENES GLB 1 S/ -
2 6 8 1 4 3 GS-S SERVICIO GLB 1 S/ -
COSTO INDIRECTO 6,566.99 30,195.81 32,370.81 30,384.81 29,184.77 33,217.27 0.00 0.00 150,450.05
PIM 2023 (CD+CI) 1 0.00 24562.00 239880.32 221557.86 476735.74 91644.38 228885.80 144765.66 79013.92 69608.34 33217.27 0.00 S/ 1,058,855.47
C1
C2
C3
CI
0
USCO
CONSOLIDADO 2023
Ejercicio Fiscal 2023
(Detallado)
Centro de Costo
2 6 2 3 2 4 PERSONAL S/ 393,817.54
2 6 2 3 2 4 CD-P OPERARIO mes 2256.88 0 0 3 5 9 6 9 8 9 7 0 0 56.00 S/ 126,385.28
2 6 2 3 2 4 CD-P OFICIAL mes 1927 0 0 3 3 5 3 5 3 5 4 0 0 31.00 S/ 59,737.00
2 6 2 3 2 4 CD-P PEON mes 1764.78 0 0 15 15 17 14 16 11 9 8 0 0 105.00 S/ 185,301.90
2 6 2 3 2 4 CD-P ALMACENERO mes 1405.14 0 0 1 1 1 1 1 1 1 1 0 0 8.00 S/ 11,241.12
2 6 2 3 2 4 GS-P GUARDIAN mes 1394.03 0 0 1 1 1 1 1 1 1 1 0 0 8.00 S/ 11,152.24
2 6 2 3 2 5 BIENES S/ 482,101.74
2 6 2 3 2 5 CD-B LENTES DE SEGURIDAD LUNA OSCURA UND 5.5 0 0 20 0 0 0 0 0 0 0 0 0 20.00 S/ 110.00
2 6 2 3 2 5 CD-B GUANTES DE CUERO REFORZADO PAR 8.8 0 0 50 0 0 0 0 0 0 0 0 0 50.00 S/ 440.00
2 6 2 3 2 5 CD-B CASCO DE SEGURIDAD TIPO JOKEY CON BARBIQUEJO PARA PERSONAL OBRERO UND 10 0 0 30 0 0 0 0 0 0 0 0 0 30.00 S/ 300.00
2 6 2 3 2 5 CD-B CASCO DE SEGURIDAD TIPO JOKEY CON BARBIQUEJO PARA PERSONAL OBRERO UND 8.8 0 0 5 0 0 0 0 0 0 0 0 0 5.00 S/ 44.00
CASCO DE SEGURIDAD TIPO JOKEY CON BARBIQUEJO PARA PERSONAL OBRERO
2 6 2 3 2 5 CD-B UND 10 0 0 5 0 0 0 0 0 0 0 0 0 5.00 S/ 50.00
C/AZUL
2 6 2 3 2 5 CD-B CORTAVIENTO PARA CASCO COLOR NARANJA UND 5.5 0 0 40 0 0 0 0 0 0 0 0 0 40.00 S/ 220.00
2 6 2 3 2 5 CD-B GUANTES DE CUERO TIPO BADANA DE BUENA CALIDAD PAR 8.8 0 0 80 0 0 0 0 0 0 0 0 0 80.00 S/ 704.00
2 6 2 3 2 5 CD-B BOTAS DE JEBE PUNTA ACERO PAR 44 0 0 20 0 0 0 0 0 0 0 0 0 20.00 S/ 880.00
2 6 2 3 2 5 CD-B LENTES DE SEGURIDAD LUNA TRANSPARENTE UND 5.5 0 0 10 0 0 0 0 0 0 0 0 0 10.00 S/ 55.00
2 6 2 3 2 5 CD-B MANDIL DE CUERO P/SOLDAR UND 30.2 0 0 1 0 0 0 0 0 0 0 0 0 1.00 S/ 30.20
2 6 2 3 2 5 CD-B PROTECTOR DE OIDO TAMPON UND 3 0 0 30 0 0 0 0 0 0 0 0 0 30.00 S/ 90.00
2 6 2 3 2 6 CD-S TRAJE TYBEX UND 13 0 0 20 0 0 0 0 0 0 0 0 0 20.00 S/ 260.00
2 6 2 3 2 6 CD-S GUANTES DE JEBE PARA ALBAÑIL N°8 Y N°9 PAR 8.8 0 0 60 0 0 0 0 0 0 0 0 0 60.00 S/ 528.00
UNIFORME MAMELUCO DE 2 PIEZAS CAMISA Y PANTALON CON CINTA
2 6 2 3 2 5 CD-B UND 58.3 0 0 50 0 0 0 0 0 0 0 0 0 50.00 S/ 2,915.00
REFLECTIVA C/LOGO
2 6 2 3 2 5 CD-B ZAPATOS DE SEGURIDAD PUNTA DE ACERO UND 60 0 0 50 0 0 0 0 0 0 0 0 0 50.00 S/ 3,000.00
CASCO DE SEGURIDAD TIPO JOKEY COLOR BLANCO CON PERILLA P/ PERSONAL
2 6 2 3 2 5 CD-B UND 58 0 0 4 0 0 0 0 0 0 0 0 0 4.00 S/ 232.00
TÉCNICO
2 6 2 3 2 5 CD-B ZAPATO PUNTA DE ACERO PARA EL PERSONAL TÉCNICO PAR 380 0 0 6 0 0 0 0 0 0 0 0 0 6.00 S/ 2,280.00
2 6 2 3 2 5 CD-B CASACA TERMICA P/PERSONAL TÉCNICO UND 140 0 0 6 0 0 0 0 0 0 0 0 0 6.00 S/ 840.00
2 6 2 3 2 5 CD-B LENTES DE SEGURIDAD CONTRA RAYOS LV COLOR OSCURO BUENA CALIDAD PAR 20 0 0 6 0 0 0 0 0 0 0 0 0 6.00 S/ 120.00
2 6 2 3 2 5 CD-B GUANTES DE HILO CON PALMA DE LATEX PAR 7 0 0 0 0 60 0 0 0 0 0 0 0 60.00 S/ 420.00
ACEITE MONOGRADO PARA MOTOR DE EQUIPOS LIVIANOS X 1/4 MOVIL GLN 20W-
2 6 2 3 2 5 CD-B UND 20 0 0 2 2 2 0 0 0 0 0 0 0 6.00 S/ 120.00
50 CUARTO DE GALON SUPER MIL ROW 50
2 6 2 3 2 5 CD-B ACEITE DE DIFERENCIAL 85W - 140 BALDE 428 0 0 0 0 2 0 0 0 0 0 0 0 2.00 S/ 856.00
2 6 2 3 2 5 CD-B FILTRO DE CAJA DE CAMBIOS COD.102291324-4-17 UND 92 0 0 0 0 1 0 0 0 0 0 0 0 1.00 S/ 92.00
2 6 2 3 2 5 CD-B GRASA EP2 X 5 GLN UND 280 0 0 0 0 1 0 0 0 0 0 0 0 1.00 S/ 280.00
2 6 2 3 2 5 CD-B FILTRO DE SERVO DIRECCION COD.349619 UND 187 0 0 0 0 1 0 0 0 0 0 0 0 1.00 S/ 187.00
2 6 2 3 2 5 CD-B FILTRO DE ACEITE DE MOTOR COD. 21707133 UND 159 0 0 0 0 4 0 0 0 0 0 0 0 4.00 S/ 636.00
2 6 2 3 2 5 CD-B FILTRO DE ACEITE DE MOTOR BY PASS COD. 21707132 UND 168 0 0 0 0 2 0 0 0 0 0 0 0 2.00 S/ 336.00
2 6 2 3 2 5 CD-B FILTRO DE COMBUSTIBLE COD.20976003 UND 245 0 0 0 0 2 0 0 0 0 0 0 0 2.00 S/ 490.00
2 6 2 3 2 5 CD-B FILTRO DE SEPARADOR DE AGUA COD.21380488 UND 343 0 0 0 0 2 0 0 0 0 0 0 0 2.00 S/ 686.00
2 6 2 3 2 5 CD-B FILTRO SECADOR DE AIRE COD. 21620181 UND 510 0 0 0 0 1 0 0 0 0 0 0 0 1.00 S/ 510.00
2 6 2 3 2 5 CD-B FILTRO DE AIRE PRIMARIO COD. 21041296 UND 499 0 0 0 0 1 0 0 0 0 0 0 0 1.00 S/ 499.00
SUB GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Centro de Costo
2 6 2 3 2 5 CD-B FILTRO DE AIRE SECUNDARIO COD. 21834199 UND 497 0 0 0 0 1 0 0 0 0 0 0 0 1.00 S/ 497.00
2 6 2 3 2 5 CD-B BASE SOPORTE DE FILTRO DEPARADORDE AGUA UND 857 0 0 0 0 1 0 0 0 0 0 0 0 1.00 S/ 857.00
2 6 2 3 2 5 CD-B RETROVISOR DERECHO, IZQUIERDOY LATERAL UND 788 0 0 0 0 1 0 0 0 0 0 0 0 1.00 S/ 788.00
2 6 2 3 2 5 CD-B KIT DE REPARACION PARA CAJA DE DIRECCION VOLVO UND 336 0 0 0 0 1 0 0 0 0 0 0 0 1.00 S/ 336.00
2 6 2 3 2 5 CD-B ACEITE 80W-90 X 5GLN. BALDE 428 0 0 0 0 1 0 0 0 0 0 0 0 1.00 S/ 428.00
2 6 2 3 2 5 CD-B BORNES DE BATERIA UND 10 0 0 0 0 2 0 0 0 0 0 0 0 2.00 S/ 20.00
2 6 2 3 2 5 CD-B DISCO DE CORTE DE MADERA DE 7" UND 20 0 0 15 0 0 0 0 0 0 0 0 0 15.00 S/ 300.00
2 6 2 3 2 5 CD-B DISCO DE CORTE DE ACERO DE 7" UND 20 0 0 30 0 0 0 0 0 0 0 0 0 30.00 S/ 600.00
2 6 2 3 2 5 CD-B DISCO DE CORTE DE CONCRETO DE 7" UND 26.5 0 0 4 0 0 0 0 0 0 0 0 0 4.00 S/ 106.00
2 6 2 3 2 5 CD-B DISCO PARA PULIR CONCRETO DE 7" UND 110 0 0 3 0 0 0 0 0 0 0 0 0 3.00 S/ 330.00
2 6 2 3 2 5 CD-B FILTRO DE CAJA DE CAMBIOS COD.102291324-4-17 UND 92 0 0 1 0 0 0 0 0 0 0 0 0 1.00 S/ 92.00
2 6 2 3 2 5 CD-B PINTURA ESMALTE DE 1/4 (BLANCO Y ROJO) UND 20 0 0 4 0 0 0 0 0 0 0 0 0 4.00 S/ 80.00
2 6 2 3 2 6 CD-S HOJA DE SIERRA N°24 UND 7.5 0 0 50 0 0 0 0 0 0 0 0 0 50.00 S/ 375.00
2 6 2 3 2 6 CD-S PLASTICO DOBLE ANCHO ROLLO DE 100 M X 3M RLL 440 0 0 4 0 0 0 0 0 0 0 0 0 4.00 S/ 1,760.00
2 6 2 3 2 5 CD-B REGLA DE ALUMINIO DE 1 1/2"X 4" X 6M UND 165 0 0 5 0 0 0 0 0 0 0 0 0 5.00 S/ 825.00
2 6 2 3 2 5 CD-B TECNOPOR DE 1" PARA JUNTAS DE 1.2M X 2.4M UND 20 0 0 10 0 0 0 0 0 0 0 0 0 10.00 S/ 200.00
2 6 2 3 2 5 CD-B LACA DESMOLDANTE PARA MADERA GLN 158 0 0 1 1 1 0 0 0 0 0 0 0 3.00 S/ 474.00
2 6 2 3 2 5 CD-B ESCOBA CON MANGO DE MADERA UND 12 0 0 8 0 0 0 0 0 0 0 0 0 8.00 S/ 96.00
2 6 2 3 2 5 CD-B MANGUERA DUPLEX REFORZADA DE 3/4" X 100 M RLL 195 0 0 1 0 0 0 0 0 0 0 0 0 1.00 S/ 195.00
2 6 2 3 2 5 CD-B NIVEL DE INGENIERO INCL. ACCESORIOS UND 2750 0 0 1 0 0 0 0 0 0 0 0 0 1.00 S/ 2,750.00
2 6 2 3 2 5 CD-B BROCA DE 3/8" PARA MADERA UND 8.5 0 0 20 0 0 0 0 0 0 0 0 0 20.00 S/ 170.00
2 6 2 3 2 5 CD-B TRAPO INDUSTRIAL KG 9.5 0 0 30 0 0 0 0 0 0 0 0 0 30.00 S/ 285.00
2 6 2 3 2 5 CD-B CINTA TEFLON 19MM X 50 YARDAS UND 3.5 0 0 50 0 0 0 0 0 0 0 0 0 50.00 S/ 175.00
2 6 2 3 2 5 CD-B BUGIA NGR HONDA UND 20 0 0 0 8 8 0 0 0 0 0 0 0 16.00 S/ 320.00
2 6 2 3 2 5 CD-B ADITIVO REMOVEDOR DE OXIDO GLN 135 0 0 5 0 0 0 0 0 0 0 0 0 5.00 S/ 675.00
2 6 2 3 2 5 CD-B BALDE DE 20LTS DE PLASTICO INCLUYE TAPA UND 9 0 0 0 0 10 0 0 0 0 0 0 0 10.00 S/ 90.00
2 6 2 3 2 5 CD-B DISCO DE CORTE PARA ACERO Nº 14 UND 8.5 0 0 0 0 20 0 0 0 0 0 0 0 20.00 S/ 170.00
2 6 2 3 2 5 CD-B REGLA DE ALUMINIO DE 1 1/2´´ X 4´´ X 6MTS, E=1.5MM (PESADO) UND 210 0 0 0 0 3 0 0 0 0 0 0 0 3.00 S/ 630.00
2 6 2 3 2 5 CD-B CLAVO PARA MADERA C/C DE 4" KG 6.2 0 0 0 0 60 0 0 0 0 0 0 0 60.00 S/ 372.00
2 6 2 3 2 5 CD-B DIESEL B5-S50 (PETROLEO) GLN 17.59 0 0 0 0 750 0 0 0 0 0 0 0 750.00 S/ 13,192.50
2 6 2 3 2 5 CD-B GASOLINA DE 90 OCT GLN 19 0 0 0 0 30 0 0 0 0 0 0 0 30.00 S/ 570.00
2 6 2 3 2 5 CD-B ACERO CORRUGADO FY= 4200 KG/CM2 DE 6MM VRLL 10.7 0 0 0 0 3750 0 0 0 0 0 0 0 3,750.00 S/ 40,125.00
2 6 2 3 2 5 CD-B ACERO CORRUGADO FY= 4200 KG/CM2 DE 3/4" VRLL 104 0 0 0 0 20 0 0 0 0 0 0 0 20.00 S/ 2,080.00
2 6 2 3 2 5 CD-B ACERO LISO DE 1/2 VRLL 49 0 0 0 0 0 0 0 0 0 0 0 0 0.00 S/ -
2 6 2 3 2 5 CD-B ACERO CORRUGADO FY= 4200 KG/CM2 DE 1/2" VRLL 48 0 0 0 0 40 0 60 0 0 0 0 0 100.00 S/ 4,800.00
2 6 2 3 2 5 CD-B ACERO CORRUGADO FY= 4200 KG/CM2 DE 3/8" VRLL 33 0 0 0 0 0 0 0 0 0 0 0 0 0.00 S/ -
2 6 2 3 2 5 CD-B ALAMBRE N° 8 KG 6.6 0 0 100 0 0 0 0 0 0 0 0 0 100.00 S/ 660.00
2 6 2 3 2 5 CD-B ALAMBRE N° 16 KG 7.7 0 0 100 0 0 0 0 0 0 0 0 0 100.00 S/ 770.00
2 6 2 3 2 5 CD-B CLAVO P/MADERA CON CABEZA DE 1" KG 9 0 0 0 0 0 0 0 0 0 0 0 0 0.00 S/ -
2 6 2 3 2 5 CD-B CLAVO P/MADERA CON CABEZA DE 1 1/2" KG 7.6 0 0 30 0 0 0 0 0 0 0 0 0 30.00 S/ 228.00
2 6 2 3 2 5 CD-B CLAVO P/MADERA CON CABEZA DE 2" KG 9 0 0 0 0 0 0 0 0 0 0 0 0 0.00 S/ -
2 6 2 3 2 5 CD-B CLAVO P/MADERA CON CABEZA DE 3" KG 6.6 0 0 120 0 0 0 0 0 0 0 0 0 120.00 S/ 792.00
2 6 2 3 2 5 CD-B CLAVO P/MADERA CON CABEZA DE 4" KG 6.6 0 0 30 0 0 0 0 0 0 0 0 0 30.00 S/ 198.00
2 6 2 3 2 5 CD-B CODO CPVC SAP C-10 DE 1/2" DE 90° UND 3.5 0 0 20 0 0 0 0 0 0 0 0 0 20.00 S/ 70.00
2 6 2 3 2 5 CD-B LISTONES DE MADERA CORRIENTE 2"X2"X10P UND 20 0 0 0 0 0 0 0 0 0 0 0 0 0.00 S/ -
2 6 2 3 2 5 CD-B LISTONES DE MADERA CORRIENTE 2"X3"X10P UND 28.5 0 0 80 0 0 0 0 0 0 0 0 0 80.00 S/ 2,280.00
2 6 2 3 2 5 CD-B LISTONES DE MADERA CORRIENTE 2"X3"X10P UND 23 0 0 0 0 50 0 0 0 0 0 0 0 50.00 S/ 1,150.00
2 6 2 3 2 5 CD-B TRIPLAY FENÓLICO DOBLE FILM DE 18MM X 1.22 M X 2.44 M PLN 138 0 0 30 0 0 0 0 0 0 0 0 0 30.00 S/ 4,140.00
2 6 2 3 2 5 CD-B MADERA NACIONAL P/ENCOFRAD - CARP 1 1/2´´X8´´X10P UND 48 0 0 20 0 0 0 0 0 0 0 0 0 20.00 S/ 960.00
2 6 2 3 2 5 CD-B MADERA NACIONAL P/ENCOFRAD - CARP 1 1/2´´X8´´X10P UND 43 0 0 0 0 20 0 0 0 0 0 0 0 20.00 S/ 860.00
2 6 2 3 2 5 CD-B MATERIAL LASTRE PARA BASE M3 46 0 0 0 0 1500 0 0 0 0 0 0 0 1,500.00 S/ 69,000.00
2 6 2 3 2 5 CD-B LIJAR PARA FIERRO N° 80 PLGO 3.2 0 0 25 0 0 0 0 0 0 0 0 0 25.00 S/ 80.00
2 6 2 3 2 5 CD-B PINTURA ESMALTE TRAFICO COLOR AMARILLO GLN 66 0 0 0 0 0 0 0 0 0 0 0 0 0.00 S/ -
2 6 2 3 2 5 CD-B PINTURA ESMALTE TRAFICO COLOR BLANCO GLN 66 0 0 0 0 0 0 0 0 0 0 0 0 0.00 S/ -
2 6 2 3 2 5 CD-B ROLLIZOS DE 5´´ X 6MTS UND 40 0 0 5 0 0 0 0 0 0 0 0 0 5.00 S/ 200.00
2 6 2 3 2 5 CD-B ROLLIZOS DE 6´´ X 8MTS UND 110 0 0 0 0 0 0 10 0 0 0 0 0 10.00 S/ 1,100.00
2 6 2 3 2 5 CD-B LEÑA QUINTAL 18 0 0 0 0 0 0 10 0 0 0 0 0 10.00 S/ 180.00
2 6 2 3 2 5 CD-B THIÑER GLN 24 0 0 0 0 0 0 0 0 0 0 0 0 0.00 S/ -
SUB GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Centro de Costo
2 6 2 3 2 5 CD-B TUBO DE 1/2" PVC SAP C-10 C/R BUENA CALIDAD UND 15.5 0 0 10 0 0 0 0 0 0 0 0 0 10.00 S/ 155.00
2 6 2 3 2 5 CD-B ESPATULA DE 4" UND 10 0 0 0 0 0 0 0 0 0 0 0 0 0.00 S/ -
2 6 2 3 2 5 CD-B BROCHA UND 30 0 0 0 0 0 0 0 0 0 0 0 0 0.00 S/ -
2 6 2 3 2 5 CD-B ADITIVO CURADOR DE CONCRETO GLN 35 0 0 0 0 305 305 307 0 0 0 0 0 917.00 S/ 32,095.00
2 6 2 3 2 5 CD-B CONCRETO PRE MEZCLADO FC=210KG/CM2 M3 347.71 0 0 0 0 0 0 304 186.49753 0 0 0 0 490.50 S/ 170,550.90
2 6 2 3 2 5 CD-B ADHESIVO EPOXICO DE ALTA RESISTENCIA PARA CONCRETO JUEGO/ 5KG UND 550 0 0 0 0 0 0 1 0 0 0 0 0 1.00 S/ 550.00
2 6 2 3 2 5 CD-B PINTURA P/TRÁFICO C/AMARILLO GLN 53.1 0 0 0 0 0 0 60 0 0 0 0 0 60.00 S/ 3,186.00
2 6 2 3 2 5 CD-B PINTURA P/TRÁFICO C/BLANCO GLN 53.1 0 0 0 0 0 0 20 0 0 0 0 0 20.00 S/ 1,062.00
2 6 2 3 2 5 CD-B RESPIRADOR DOBLE VIA OV/P95 UND 199 0 0 0 0 0 0 6 0 0 0 0 0 6.00 S/ 1,194.00
2 6 2 3 2 5 CD-B MASCARILLA RESPIRADOR CON VALVULA N95-8210V CAJA/10UND CAJA 129 0 0 0 0 0 0 2 0 0 0 0 0 2.00 S/ 258.00
2 6 2 3 2 5 CD-B CINTA DE SEGURIDADx200M (Color Rojo) ROLLO 30 0 0 0 0 0 0 2 0 0 0 0 0 2.00 S/ 60.00
2 6 2 3 2 5 CD-B DISCO DE CORTE DE CONCRETO DE 7” UND 32 0 0 0 0 0 0 2 0 0 0 0 0 2.00 S/ 64.00
2 6 2 3 2 5 CD-B TUBO PVC-U TIPO: ELECTRICO DIAMETRO NOMINAL DE 5/8” x 3mts UND 4.72 0 0 0 0 0 0 240 0 0 0 0 0 240.00 S/ 1,132.80
2 6 2 3 2 5 CD-B TUBO PVC-U TIPO: ELECTRICO DIAMETRO NOMINAL DE 1” x 3mts UND 9.44 0 0 0 0 0 0 170 0 0 0 0 0 170.00 S/ 1,604.80
2 6 2 3 2 5 CD-B GEOTEXTIL PARA CURADO DE CONCRETO x 100mts ROLLO 2900 0 0 0 0 0 0 1 0 0 0 0 0 1.00 S/ 2,900.00
2 6 2 3 2 5 CD-B GUANTES DE JEBE UND 13 0 0 0 0 0 0 20 0 0 0 0 0 20.00 S/ 260.00
2 6 2 3 2 5 CD-B GUANTES DE HILO CON PALMA DE LÁTEX UND 11 0 0 0 0 0 0 30 0 0 0 0 0 30.00 S/ 330.00
2 6 2 3 2 5 CD-B BROCHA DE 3” UND 20 0 0 0 0 0 0 5 0 0 0 0 0 5.00 S/ 100.00
2 6 2 3 2 5 CD-B THINNER GLN 29 0 0 0 0 0 0 50 0 0 0 0 0 50.00 S/ 1,450.00
2 6 2 3 2 5 CD-B TAPAS PARA VÁLVULA DE F°F° (0.23x0.30m) UND 35 0 0 0 0 0 0 5 0 0 0 0 0 5.00 S/ 175.00
2 6 2 3 2 5 CD-B LIJAR N°80 (Rollo x 50mts) ROLLO 770 0 0 0 0 0 0 2 0 0 0 0 0 2.00 S/ 1,540.00
2 6 2 3 2 5 CD-B ACEITE DE DIFERENCIAL 85W - 140 BALDE 428 0 0 0 0 0 2 0 0 0 0 0 0 2.00 S/ 856.00
2 6 2 3 2 5 CD-B FILTRO DE CAJA DE CAMBIOS COD.102291324-4-17 UND 92 0 0 0 0 0 1 0 0 0 0 0 0 1.00 S/ 92.00
2 6 2 3 2 5 CD-B GRASA EP2 X 5 GLN BALDE 280 0 0 0 0 0 1 0 0 0 0 0 0 1.00 S/ 280.00
2 6 2 3 2 5 CD-B FILTRO DE SERVO DIRECCION COD.349619 UND 187 0 0 0 0 0 1 0 0 0 0 0 0 1.00 S/ 187.00
2 6 2 3 2 5 CD-B FILTRO DE ACEITE DE MOTOR COD. 21707133 UND 159 0 0 0 0 0 4 0 0 0 0 0 0 4.00 S/ 636.00
2 6 2 3 2 5 CD-B FILTRO DE ACEITE DE MOTOR BY PASS COD. 21707132 UND 168 0 0 0 0 0 2 0 0 0 0 0 0 2.00 S/ 336.00
2 6 2 3 2 5 CD-B FILTRO DE COMBUSTIBLE COD.20976003 UND 245 0 0 0 0 0 2 0 0 0 0 0 0 2.00 S/ 490.00
2 6 2 3 2 5 CD-B FILTRO DE SEPARADOR DE AGUA COD.21380488 UND 343 0 0 0 0 0 2 0 0 0 0 0 0 2.00 S/ 686.00
2 6 2 3 2 5 CD-B FILTRO SECADOR DE AIRE COD. 21620181 UND 510 0 0 0 0 0 1 0 0 0 0 0 0 1.00 S/ 510.00
2 6 2 3 2 5 CD-B FILTRO DE AIRE PRIMARIO COD. 21041296 UND 499 0 0 0 0 0 1 0 0 0 0 0 0 1.00 S/ 499.00
2 6 2 3 2 5 CD-B FILTRO DE AIRE SECUNDARIO COD. 21834199 UND 497 0 0 0 0 0 1 0 0 0 0 0 0 1.00 S/ 497.00
2 6 2 3 2 5 CD-B BASE SOPORTE DE FILTRO DEPARADORDE AGUA UND 857 0 0 0 0 0 1 0 0 0 0 0 0 1.00 S/ 857.00
2 6 2 3 2 5 CD-B RETROVISOR DERECHO, IZQUIERDOY LATERAL UND 788 0 0 0 0 0 1 0 0 0 0 0 0 1.00 S/ 788.00
2 6 2 3 2 5 CD-B KIT DE REPARACION PARA CAJA DE DIRECCION VOLVO UND 336 0 0 0 0 0 1 0 0 0 0 0 0 1.00 S/ 336.00
2 6 2 3 2 5 CD-B ACEITE 80W-90 X 5GLN. BALDE 428 0 0 0 0 0 1 0 0 0 0 0 0 1.00 S/ 428.00
2 6 2 3 2 5 CD-B BORNES DE BATERIA UND 10 0 0 0 0 0 2 0 0 0 0 0 0 2.00 S/ 20.00
2 6 2 3 2 5 CD-B ANGULAR DE 1"X1"X6M, E=2MM UND 28.5 0 0 0 0 0 10 0 0 0 0 0 0 10.00 S/ 285.00
2 6 2 3 2 5 CD-B ANGULAR DE 2 1/2" X 2 1/2" X 6M, E=3.16MM UND 173 0 0 0 0 0 3 0 0 0 0 0 0 3.00 S/ 519.00
2 6 2 3 2 5 CD-B ELECTRODO PUNTO AZUL DE 1/8" KG 20.2 0 0 0 0 0 60 0 0 0 0 0 0 60.00 S/ 1,212.00
2 6 2 3 2 5 CD-B ELECTRODO SUPERCITO DE 1/8" KG 21.5 0 0 0 0 0 30 0 0 0 0 0 0 30.00 S/ 645.00
2 6 2 3 2 5 CD-B PLATINA DE ACERO DE 1/2" X 2" X 6M UND 201 0 0 0 0 0 38 0 0 0 0 0 0 38.00 S/ 7,638.00
2 6 2 3 2 5 CD-B PLATINA DE 2"X1/8"X6M UND 49 0 0 0 0 0 0 8 0 0 0 0 0 8.00 S/ 392.00
2 6 2 3 2 5 CD-B PROBETAS CILINDRICAS METALICAS P/BRIQUETAS DE CONCRETO (BRIQUETERAS) UND 280 0 0 0 0 0 0 3 0 0 0 0 0 3.00 S/ 840.00
2 6 2 3 2 5 CD-B ADQUISICION DE CATEL DE OBRA UND 850 0 0 0 0 0 1 0 0 0 0 0 0 1.00 S/ 850.00
2 6 2 3 2 5 GG-B ARCHIVADOR DE CARTON CON PALANCA LOMO ANCHO TAMAÑO MEDIO OFICIO UND 9 0 0 6 0 0 0 0 0 0 0 0 0 6.00 S/ 54.00
2 6 2 3 2 5 GG-B ARCHIVADOR TIPO PALANCA LOMO ANCHO PARA FORMATO A-4 UND 15 0 0 9 0 0 0 0 0 0 0 0 0 9.00 S/ 135.00
2 6 2 3 2 5 GG-B BINDER CLIPS 15/8 CAJA 10 0 0 2 0 0 0 0 0 0 0 0 0 2.00 S/ 20.00
2 6 2 3 2 5 GG-B CD BLANCO INCLUIDO ESTUCHE UND 1.5 0 0 25 0 0 0 0 0 0 0 0 0 25.00 S/ 37.50
2 6 2 3 2 5 GG-B CINTA ADHESIVA DE 3/4" 72YARDAS UND 5.5 0 0 3 0 0 0 0 0 0 0 0 0 3.00 S/ 16.50
2 6 2 3 2 5 GG-B CLIPS TIPO MARIPOSA DE 45MM CAJA 5 0 0 2 0 0 0 0 0 0 0 0 0 2.00 S/ 10.00
2 6 2 3 2 5 GG-B CLIPS METALICO PEQUEÑO CAJA 2.5 0 0 2 0 0 0 0 0 0 0 0 0 2.00 S/ 5.00
2 6 2 3 2 5 GG-B CORRECTOR LIQUIDO TIPO LAPIZ DE 9ML UND 3.5 0 0 6 0 0 0 0 0 0 0 0 0 6.00 S/ 21.00
2 6 2 3 2 5 GG-B CUADERNO CON ESPIRAL DE 100 HOJAS UND 9.5 0 0 8 0 0 0 0 0 0 0 0 0 8.00 S/ 76.00
2 6 2 3 2 5 GG-B CUADERNO DE OBRA AUTOCOPIATIVO DE 100 HOJAS 1X 3 COPIAS UND 70 0 0 2 0 0 0 0 0 0 0 0 0 2.00 S/ 140.00
2 6 2 3 2 5 GG-B FOLDER MANILA A-4 (INCLUYE FASTENER) PQT 16 0 0 2 0 0 0 0 0 0 0 0 0 2.00 S/ 32.00
2 6 2 3 2 5 GG-B FOLIADOR METALICO AUTOMATICO DE 6 DIGITOS (BUENA CALIDAD) UND 70 0 0 1 0 0 0 0 0 0 0 0 0 1.00 S/ 70.00
2 6 2 3 2 5 GG-B GRAPAS 26/6 X 5000 UND CAJA 6 0 0 1 0 0 0 0 0 0 0 0 0 1.00 S/ 6.00
SUB GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Centro de Costo
2 6 2 3 2 5 GG-B BOLIGRAFO (LAPICERO) COLOR AZUL NRO. 0.70 CAJA 38 0 0 1 0 0 0 0 0 0 0 0 0 1.00 S/ 38.00
BOLÍGRAFO (LAPICERO) TINTA LIQUIDA PUNTA FINA 0.6 MM C/AZUL, NEGRO Y
2 6 2 3 2 5 GG-B CAJA 5 0 0 6 0 0 0 0 0 0 0 0 0 6.00 S/ 30.00
ROJO
2 6 2 3 2 5 GG-B LIBRETA TOPOGRÁFICA UND 9 0 0 3 0 0 0 0 0 0 0 0 0 3.00 S/ 27.00
2 6 2 3 2 5 GG-B POSIT DE COLORES 3X3 X 500 UNIDADES PQT 15 0 0 4 0 0 0 0 0 0 0 0 0 4.00 S/ 60.00
2 6 2 3 2 5 GG-B PAPEL BOND COLOR MILL 90 0 0 1 0 0 0 0 0 0 0 0 0 1.00 S/ 90.00
2 6 2 3 2 5 GG-B PAPEL BOND DE 75GR. TAMAÑO A4 HOJAS DE COLOR BLANDO MILL 43 0 0 10 0 0 0 0 0 0 0 0 0 10.00 S/ 430.00
2 6 2 3 2 5 GG-B PARTES DIARIO DE EQUIPO (MAQUINARIA X 50HOJAS AUTOCOPIABLES 1X3) TAL 23 0 0 6 0 0 0 0 0 0 0 0 0 6.00 S/ 138.00
2 6 2 3 2 5 GG-B PLUMON RESALTADOR (COLOR: AMARILLO, ANARANJADO Y VERDE) UND 3.5 0 0 12 0 0 0 0 0 0 0 0 0 12.00 S/ 42.00
2 6 2 3 2 5 GG-B NOTA DE ENTRADA DE 50 HOJAS (1ORIGINAL + 3 AUTOCOPIAS) UND 23 0 0 2 0 0 0 0 0 0 0 0 0 2.00 S/ 46.00
2 6 2 3 2 5 GG-B NOTA DE SALIDA DE 50 HOJAS (1ORIGINAL + 3 AUTOCOPIAS) UND 23 0 0 6 0 0 0 0 0 0 0 0 0 6.00 S/ 138.00
2 6 2 3 2 5 GG-B SOBRE MANILA A4 (PAQUETE X 50 UNIDADES) PQT 25 0 0 1 0 0 0 0 0 0 0 0 0 1.00 S/ 25.00
2 6 2 3 2 5 GG-B TIJERA DE OFICINA UNIVERSAL 8 PULGADAS UND 7 0 0 2 0 0 0 0 0 0 0 0 0 2.00 S/ 14.00
2 6 2 3 2 5 GG-B TINTA LÍQUIDA PARA SELLO AUTOMÁTICO COLOR NEGRO UND 17 0 0 2 0 0 0 0 0 0 0 0 0 2.00 S/ 34.00
2 6 2 3 2 5 GG-B TINTA PARA IMPRESORA (NEGRO, CIAN, MAGENTA Y AMARILLO) LTR 100 0 0 4 0 0 0 0 0 0 0 0 0 4.00 S/ 400.00
2 6 2 3 2 5 GG-B CUTER GRANDE UND 3.5 0 0 1 0 0 0 0 0 0 0 0 0 1.00 S/ 3.50
2 6 2 3 2 5 GG-B PAPEL LUSTRE COLOR PLG 0.6 0 0 14 0 0 0 0 0 0 0 0 0 14.00 S/ 8.40
2 6 2 3 2 5 GG-B GOMA EN BARRA DE 40GR UND 8 0 0 3 0 0 0 0 0 0 0 0 0 3.00 S/ 24.00
2 6 2 3 2 5 GG-B SELLO AUTOMÁTICO SEGÚN MODELO UND 27 0 0 2 0 0 0 0 0 0 0 0 0 2.00 S/ 54.00
2 6 2 3 2 5 CD-B REGLA METÁLICA UND 8 0 0 2 0 0 0 0 0 0 0 0 0 2.00 S/ 16.00
2 6 2 3 2 5 CD-B CARRETILLA TIPO BUGUIE UND 277 0 0 0 0 0 0 0 0 0 0 0 0 0.00 S/ -
2 6 2 3 2 5 CD-B PEGAMENTO PARA PVC DE 1GLN UND 160 0 0 1 0 0 0 0 0 0 0 0 0 1.00 S/ 160.00
2 6 2 3 2 5 CD-B GRASA EP2 X 5 GLN BALDE 280 0 0 1 0 0 0 0 0 0 0 0 0 1.00 S/ 280.00
2 6 2 3 2 5 CD-B CABLE VULCANIZADO TIPO NLT DE 2 X 16 AWG AISLADO PVC X 100M RLL 380 0 0 1 0 0 0 0 0 0 0 0 0 1.00 S/ 380.00
2 6 2 3 2 5 CD-B CINTA AISLANTE UND 5.5 0 0 2 0 0 0 0 0 0 0 0 0 2.00 S/ 11.00
2 6 2 3 2 5 CD-B ELECTRODO 6011 1/8 KG 20 0 0 40 0 0 0 0 0 0 0 0 0 40.00 S/ 800.00
2 6 2 3 2 5 CD-B MULTICONTACTO TRIPLE PARA EXTENCION UND 30 0 0 2 0 0 0 0 0 0 0 0 0 2.00 S/ 60.00
2 6 2 3 2 5 CD-B ENCHUFE PLANO UND 9.5 0 0 2 0 0 0 0 0 0 0 0 0 2.00 S/ 19.00
2 6 2 3 2 5 CD-B TERMOMAGNETICO DE 32 AMPERIOS UND 55 0 0 2 0 0 0 0 0 0 0 0 0 2.00 S/ 110.00
2 6 2 3 2 5 CD-B BALDE DE 20LTS DE PLASTICO INCLUYE TAPA UND 10 0 0 10 0 0 0 0 0 0 0 0 0 10.00 S/ 100.00
2 6 2 3 2 5 CD-B ZAPAPICO DE 5 LBS CON MANGO DE MADERA UND 45 0 0 15 0 0 0 0 0 0 0 0 0 15.00 S/ 675.00
2 6 2 3 2 5 CD-B CORREA PARA MEZCLADORA DE CONCRETO UND 30 0 0 3 0 0 0 0 0 0 0 0 0 3.00 S/ 90.00
2 6 2 3 2 5 CD-B ARENA GRUESA M3 90 0 0 105 0 0 0 0 0 0 0 0 0 105.00 S/ 9,450.00
2 6 2 3 2 5 CD-B PIEDRA MEDIANA DE 6" M3 85 0 0 150 0 0 0 0 0 0 0 0 0 150.00 S/ 12,750.00
2 6 2 3 2 5 CD-B CEMENTO PORTLAND TIPO IP (42.5 KG) BLS 26.74 0 0 0 1500 0 0 0 0 0 0 0 0 1,500.00 S/ 40,110.00
2 6 2 3 2 5 CD-B ANGULAR DE FIERRO 2X1/4X6M E=3.16MM VAR 90 0 0 0 0 0 0 0 0 0 0 0 0 0.00 S/ -
2 6 2 3 2 5 CD-B PLATINA DE E= 1/2"X2"X6M VAR 260 0 0 0 0 0 0 0 0 0 0 0 0 0.00 S/ -
2 6 2 3 2 5 CD-B CODO DE 1/2" PVC SAP C-10 UND 2 0 0 0 0 0 0 0 0 0 0 0 0 0.00 S/ -
2 6 2 3 2 5 CD-B UNION REPARACION DE 1/2" PVC SAP C-10 UND 13.4 0 0 20 0 0 0 0 0 0 0 0 0 20.00 S/ 268.00
2 6 2 3 2 5 CD-B LLAVE DE PASO CORPORATION DE 1/2" UND 13.5 0 0 10 0 0 0 0 0 0 0 0 0 10.00 S/ 135.00
2 6 2 3 2 5 CD-B TUBO DE 1/2" PVC SAP C-10 C/R BUENA CALIDAD UND 15.5 0 0 0 0 10 0 0 0 0 0 0 0 10.00 S/ 155.00
TUBO: MATERIAL: PVC-U TIPO:ELECTRICO DIAMETRO NOMINAL:3/4 ESPESOR
2 6 2 3 2 5 CD-B 1.2MM LONGITUD: 3M RIGIDEZ NOMINAL: CLASE LIVIANA ENPALME: SIMPLE UND 12 0 0 0 9.9702601153 0 0 0 0 0 0 0 0 9.97 S/ 119.64
PRESION.
2 6 2 3 2 5 SERVICIOS S/ 34,711.06
2 6 2 3 2 5 CD-S TROZADORA DE METAL ELECTRICO DE 14" UND 1000 0 0 0 0 0 0 0 0 0 0 0 0 0.00 S/ -
2 6 2 3 2 5 CD-S CARGADOR SOBRE LLANTAS DE 125-155 HP 3.5 yd3 HM 104.75 0 0 0 15 15 15 0 0 0 0 0 0 45.00 S/ 4,713.75
2 6 2 3 2 6 CD-S TRACTOR DE ORUGAS DE 190-240 HP HM 135.59 0 0 0 10 10 10 0 0 0 0 0 0 30.00 S/ 4,067.70
2 6 2 3 2 6 CD-S CAMION VOLQUETE 15 M3 HM 101.69 0 0 0 15 15 15 0 0 0 0 0 0 45.00 S/ 4,576.05
2 6 2 3 2 6 CD-S MOTONIVELADORA DE 130-135 HP HM 152.54 0 0 0 10 10 10 0 0 0 0 0 0 30.00 S/ 4,576.20
2 6 2 3 2 6 CD-S RODILLO LISO VIBR AUTOP 101-135HP 10-12T HM 127.12 0 0 0 12 12 12 0 0 0 0 0 0 36.00 S/ 4,576.32
2 6 2 3 2 6 CD-S CAMION CISTERNA 4X2 (AGUA) 1,500 GAL HM 118.64 0 0 0 12 12 12 0 0 0 0 0 0 36.00 S/ 4,271.04
2 6 2 3 2 5 CD-S FLETE TERRESTRE GLB 2500 0 0 0 0 1 0 0 0 0 0 0 0 1.00 S/ 2,500.00
2 6 2 3 2 5 CD-S SC DENSIDAD DE CAMPO UND 30 0 0 25 0 0 0 0 0 0 0 0 0 25.00 S/ 750.00
2 6 2 3 2 6 CD-S SC RUPTURA DE BRIQUETAS UND 25 0 0 0 0 0 0 0 60 0 0 0 0 60.00 S/ 1,500.00
2 6 2 3 2 6 CD-S SC ESTUDIO DE SUELOS GLB 1100 0 0 1 0 0 0 0 0 0 0 0 0 1.00 S/ 1,100.00
2 6 2 3 2 6 CD-S SC ESTUDIO DE CANTERA DE MATERIAL BASE GLB 350 0 0 1 0 0 0 0 0 0 0 0 0 1.00 S/ 350.00
2 6 2 3 2 6 CD-S SC DISEÑO DE MEZCLAS DE CONCRETO GLB 480 0 0 1 0 0 0 0 0 0 0 0 0 1.00 S/ 480.00
2 6 2 3 2 6 CD-S SC RUPTURA DE BRIQUETAS UND 25 0 0 50 0 0 0 0 0 0 0 0 0 50.00 S/ 1,250.00
TOTAL PRESUPUESTO S/ 910,630.34
SUB GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Centro de Costo
Centro de Costo
N° CÓDIGO DE Unidad de P.U
Detalle Especifica Descripcion
Ord. CUBSO Medida (Referencial) Programación de Acciones - Cantidad - FISICA
TOTAL
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC CANT. TOTAL
(S/)
1º 2º 3º 4º 5º 6º 7º 8º 9º 10º 11º 12º
COSTO DIRECTO S/ 908,405.42
2 6 2 3 2 4 CD-P PERSONAL GLB 1 0.00 0.00 41,822.51 46,336.27 62,747.35 46,828.37 60,982.57 46,047.79 48,629.11 40,423.57 0.00 0.00 S/ 393,817.54
2 6 2 3 2 5 CD-B BIENES GLB 1 0.00 0.00 58,147.20 40,587.64 149,265.50 29,322.00 137,707.42 64,847.06 0.00 0.00 0.00 0.00 S/ 479,876.82
2 6 2 3 2 6 CD-S SERVICIO GLB 1 0.00 0.00 3,930.00 8,927.02 11,427.02 8,927.02 0.00 1,500.00 0.00 0.00 0.00 0.00 S/ 34,711.06
GASTOS GENERALES S/ 93,852.90
2 6 2 3 2 4 GG-P PERSONAL GLB 1 7,828.00 10,475.00 10,475.00 10,475.00 10,475.00 10,475.00 10,475.00 10,475.00 10,475.00 0.00 0.00 S/ 91,628.00
2 6 2 3 2 5 GG-B BIENES GLB 1 2,224.90 S/ 2,224.90
2 6 2 3 2 6 GG-S SERVICIO GLB 1 S/ -
GASTOS DE SUPERVISION S/ 40,077.00
2 6 8 1 4 1 GS-P PERSONAL GLB 1 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 S/ 40,077.00
2 6 8 1 4 2 GS-B BIENES GLB 1 S/ -
2 6 8 1 4 3 GS-S SERVICIO GLB 1 S/ -
GASTOS DE LIQUIDACIÓN S/ 16,520.15
2 6 2 3 2 4 GG-P PERSONAL GLB 1 16,520.15 S/ 16,520.15
2 6 2 3 2 5 GG-B BIENES GLB 1 S/ -
2 6 2 3 2 6 GG-S SERVICIO GLB 1 S/ -
PLAN DE MONITOREO ARQUEOLÓGICO S/ -
2 6 8 1 4 1 GS-P PERSONAL GLB 1 S/ -
2 6 8 1 4 2 GS-B BIENES GLB 1 S/ -
2 6 8 1 4 3 GS-S SERVICIO GLB 1 S/ -
COSTO DIRECTO GLB 1 0.00 0.00 103,899.71 95,850.93 223,439.87 85,077.39 198,689.99 112,394.85 48,629.11 40,423.57 0.00 0.00 S/ 908,405.42
GASTOS GENERALES GLB 1 0.00 7,828.00 12,699.90 10,475.00 10,475.00 10,475.00 10,475.00 10,475.00 10,475.00 10,475.00 0.00 0.00 S/ 93,852.90
GASTOS DE SUPERVISION GLB 1 0.00 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 4,453.00 0.00 0.00 S/ 40,077.00
GASTOS DE LIQUIDACIÓN GLB 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16,520.15 0.00 S/ 16,520.15
PLAN DE MONITOREO ARQUEOLÓGICO GLB 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 S/ -
TOTAL PIM 1 0 12281 121052.61 110778.93 238367.87 100005.39 213617.99 127322.85 63557.11 55351.57 16520 0 S/ 1,058,855.47
S/ 1,058,855.47
S/ -
CUADRO DE NECESIDADES
Ejercicio Fiscal 2023
(Detallado)
Nro 1 :Tarea (Actividad Operati : COMPONENTE 01: ADECUADA INFRAESTRUCTURA VIAL+ 2334951
Indicador de Desempeño (*: ACCION
Indicador de Producción Fís: ACCION
Responsable : ING. YURI VLADIMIR NIEVES NUÑONCCA
Residente de obra : ING. JHON ALAN VILCA FERNÁNDEZ
2 6 2 3 2 4 PERSONAL S/ 560,155.83
COSTO DIRECTO - PERSONAL S/ 321,033.60
1 PLANILLA DE PERSONAL OBRERO S/ 321,033.60
1.1 CD-P OPERARIO mes 36.00 2529.60 0 0 3 7 7 6 9 9 7 5 53.00 S/ 134,068.80
1.2 CD-P OFICIAL mes 28.00 2164.80 0 0 3 3 2 1 4 4 2 2 21.00 S/ 45,460.80
1.3 CD-P PEON mes 98.00 1768.80 0 0 14 14 12 9 10 10 8 3 80.00 S/ 141,504.00
GASTOS GENERALES - PERSONAL S/ 188,450.49
2 PLANILLA DE PERSONAL TECNICO ADMINISTRATIVO S/ 188,450.49
2.1 GG-P RESIDENTE DE OBRA MES 8 5,565.52 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 9.00 S/ 50,089.70
2.3 GG-P ASISTENTE TECNICO I MES 8 4,412.85 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 9.00 S/ 39,715.65
2.4 GG-P ASISTENTE ADMINISTRATIVO MES 8 2,619.82 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 9.00 S/ 23,578.35
2.4 GG-P ESP. EN SEGURIDAD Y SALUD EN EL TRABAJO MES 8 4,540.93 1.00 1.00 1.00 1.00 1.00 1.00 6.00 S/ 27,245.58
2.5 GG-P MAESTRO DE OBRA MES 8 2,363.67 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 9.00 S/ 21,273.02
2.6 GG-P ALMACENERO MES 8 1,979.45 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 8.00 S/ 15,835.57
2.7 GG-P GUARDIÁN MES 8 1,339.08 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 8.00 S/ 10,712.62
1 S/ -
SUB TOTAL Err:520
Nro 2 :Tarea (Actividad Operati COMPONENTE 02: ADECUADA INFRAESTRUCTURA PEATONAL+ 2334951 Err:520
Indicador de Desempeño (*: ACCION
Indicador de Producción Fís: ACCION
Responsable : ING. YURI VLADIMIR NIEVES NUÑONCCA
Residente de obra : ING. JHON ALAN VILCA FERNÁNDEZ
2 6 2 3 2 4 PERSONAL S/ -
COSTO DIRECTO - PERSONAL S/ -
S/ -
GASTOS GENERALES - PERSONAL S/ -
S/ -
GASTOS DE SUPERVISION - PERSONAL S/ -
S/ -
2 6 2 3 2 5 BIENES Err:520
COSTO DIRECTO - BIENES Err:520
6 ADQUISICIÓN DE CEMENTO PORTLAND S/ 40,110.00
6.1 CD-B CEMENTO PORTLAND TIPO IP (42.50KG) BLS 26.74 750.00 ### 1500.00 S/ 40,110.00
7 ADQUISICION DE MATERIALES DE FERRETERÍA S/ 1,742.00
7.1 CD-B GUANTES DE HILO CON PALMA DE LÁTEX PAR S/ 7.00 ### 60.00 S/ 420.00
7.2 CD-B BALDE DE 20 LTS DE PLÁSTICO INCLUYE TAPA UND S/ 9.00 ### 10.00 S/ 90.00
7.2 CD-B DISCO DE CORTE DE ACERO PARA ACERO N°14 UND S/ 8.50 ### 20.00 S/ 170.00
7.2 CD-B REGLA DE ALUMINIO DE 1 1/2" X 4" X6MTS, E=1.5MM (PESADO) UND S/ 230.00 3.00 3.00 S/ 690.00
7.2 CD-B CLAVO PARA MADERA C/C DE 4" KG S/ 6.20 ### 60.00 S/ 372.00
3 CONTRATACION DE MADERAMEN S/ 3,705.00
3.1 CD-B LISTONES DE MADERA CORRIENTE 2"X3"X10P UND 12.00 S/ 28.50 80.00 ### 130.00 S/ 3,705.00
3.2 CD-B MADERA NACIONAL P/ENCOFRAD - CARP 1 1/2"X8"X10p UND 28.00 S/ 48.00 20.00 ### 40.00 S/ 1,920.00
3.3 CD-B ROLLIZOS DE 5”X6MTS UND 62.00 S/ 40.00 5.00 5.00 S/ 200.00
3.4 CD-B TRIPLAY FENÓLICO DOBLE FILM DE 18MM X 1.22 M X 2.44 M PLN 12.00 S/ 138.00 30.00 30.00 S/ 4,140.00
GASTOS GENERALES - BIENES S/ -
GASTOS DE SUPERVISION - BIENES S/ -
2 6 2 3 2 6 SERVICIOS S/ -
COSTO DIRECTO - SERVICIOS S/ -
Nro 3 :Tarea (Actividad Operati COMPONENTE 03: ADECUADA EVACUACIÓN DE AGUAS PLUVIALES+ 2334951
Indicador de Desempeño (*: ACCION
Indicador de Producción Fís: ACCION
Responsable : ING. YURI VLADIMIR NIEVES NUÑONCCA
Residente de obra : ING. JHON ALAN VILCA FERNÁNDEZ
2 6 2 3 2 4 PERSONAL S/ -
COSTO DIRECTO - PERSONAL S/ -
S/ -
GASTOS GENERALES - PERSONAL S/ -
S/ -
GASTOS DE SUPERVISION - PERSONAL S/ -
S/ -
2 6 2 3 2 5 BIENES Err:520
COSTO DIRECTO - BIENES Err:520
ADQUISICION DE MATERIALES Y ACCESORIOS PARA
13 S/ 10,299.00
ESTRUCTURAS METALICAS
13.1 CD-B ANGULAR DE 1"X1"X6M, E=2MM UND S/ 28.50 10.00 10.00 S/ 285.00
13.2 CD-B ANGULAR DE 2 1/2" X 2 1/2" X 6M, E=3.16MM UND S/ 173.00 3.00 3.00 S/ 519.00
13.3 CD-B ELECTRODO PUNTO AZUL DE 1/8" KG S/ 20.20 60.00 60.00 S/ 1,212.00
13.4 CD-B ELECTRODO SUPERCITO DE 1/8" KG S/ 21.50 30.00 30.00 S/ 645.00
13.5 CD-B PLATINA DE ACERO DE 1/2" X 2" X 6M UND S/ 201.00 38.00 38.00 S/ 7,638.00
GASTOS GENERALES - BIENES S/ -
GASTOS DE SUPERVISION - BIENES S/ -
S/ -
2 6 2 3 2 6 SERVICIOS Err:520
COSTO DIRECTO - SERVICIOS Err:520
GASTOS GENERALES - SERVICIOS S/ -
Centro de Costo
2 6 2 3 2 4 PERSONAL
2 6 2 3 2 4 CD-P OPERARIO mes 2,529.60 0 0 3 7 7 6 9.00 9 7 5 0 0
2 6 2 3 2 4 CD-P OFICIAL mes 2,164.80 0 0 3 3 2 1 4.00 4 2 2 0 0
2 6 2 3 2 4 CD-P PEON mes 1,768.80 0 0 14 14 12 9 10.00 10 8 3 0 0
2 6 2 3 2 4 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 4 GG-P RESIDENTE DE OBRA MES 5,565.52 0 1 1 1 1 1 1 1 1 1 0 0
2 6 2 3 2 4 GG-P ASISTENTE TECNICO I MES 4,412.85 0 1 1 1 1 1 1 1 1 1 0 0
2 6 2 3 2 4 GG-P ASISTENTE ADMINISTRATIVO MES 2,619.82 0 1 1 1 1 1 1 1 1 1 0 0
2 6 2 3 2 4 GG-P MAESTRO DE OBRA MES 2,363.67 0 1 1 1 1 1 1 1 1 1 0 0
2 6 2 3 2 4 GG-P ALMACENERO MES 1,979.45 0 0 1 1 1 1 1 1 1 1 0 0
2 6 2 3 2 4 GG-P GUARDIÁN MES 1,339.08 0 0 1 1 1 1 1 1 1 1 0 0
2 6 2 3 2 4 GS-P SUPERVISOR DE OBRA MES 6,333.97 0 1 1 0 1 1 1 1 1 1 0 0
2 6 2 3 2 5 BIENES
Construccion de obras exteriores : OBRAS PRELIMINARES
2 6 2 3 2 5 CD-B Err:520 hm 7.00 0 0 0 0 0 Err:520 0 0 0 0 0 0
2 6 2 3 2 5 CD-B Err:520 hm 12.00 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B RETROVISOR DERECHO, IZQUIERDOY LATERAL UND 788.00 Err:520 Err:520 Err:520 Err:520 0 1.00 0 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 0 0 0 0 0 0
2 6 2 3 2 5 CD-B PARTES DIARIOS DE EQUIPO/MAQUINARIA X 50 HOJAS (AUTOCOPIATIVO 1X3 COPIAS) TAL 23.00 0 0 105 0 0 0.00 0 0 0 0 0 0
2 6 2 3 2 5 CD-B NOTAS DE SALIDA DE ALMACEN (1X3 COPIAS) AUTOCOPIATIVO X 50 HOJAS TALONARIO 23.00 Err:520 Err:520 Err:520 Err:520 0 0.00 0 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B SELLO AUTOMATIVO SEGÚN MODELO UNIDAD 27.00 Err:520 Err:520 Err:520 Err:520 0 0.00 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 0 0 0 0 0 0
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 0 0 0 0 0 0
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
SUB GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Centro de Costo
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 0 0 0 0 0 0
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 0 0 0 0 0 0
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 0 0 0 0 0 0
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B LENTES DE SEGURIDAD CONTRA RAYOS LV COLOR OSCURO UND 20.00 Err:520 Err:520 Err:520 Err:520 0 0.00 0 0 Err:520 Err:520 Err:520 Err:520
Centro de Costo
Centro de Costo
BIENES
Adquisicion de mobiliario urbano : MOBILIARIO EN ESPACIOS PUBLICOS
2 6 2 3 2 6 SERVICIO
2 6 2 3 2 6 Err:520 Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 6 Err:520 Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 6 Err:520 Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 0 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 6 Err:520 Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 6 GG-S Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 Err:520 0 0 0 0 0
2 6 2 3 2 6 CD-S Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 6 CD-S Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 Err:520 Err:520 0 0 0 0
2 6 2 3 2 6 CD-S ZAPATO PUNTA ACERO PARA EL PERSONAL TECNICO PAR 380.00 0 0 0 0 0 1 1 1 0 0 0 0
2 6 2 3 2 6 CD-S SERVICIO DE ESTUDIO DE MECANICA DE SUELOS GLB 1,100.00 0 0 0 0 0 1 0 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 6 CD-S Err:520 Err:520 Err:520 5 0 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 6 CD-S Err:520 Err:520 Err:520 5 0 Err:520 Err:520 Err:520 Err:520 Err:520
TOTAL PRESUPUESTO
Centro de Costo
N° CÓDIGO DE Unidad de P.U
Detalle Especifica Descripcion
Ord. CUBSO Medida (Referencial)
SUB GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Centro de Costo
COSTO DIRECTO GLB 1 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 ### ###
GASTOS GENERALES GLB 1 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 ### ###
GASTOS DE SUPERVISION GLB 1 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 ### ###
GASTOS PROGRAMADOS 1 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 ### ###
CONSOLIDADO 2023
Ejercicio Fiscal 2023
(Detallado)
PROVINCIA DE CANCHIS-CUSCO
Centro de Costo
TOTAL
CANT. TOTAL
(S/)
Err:520
53.00 S/ 134,068.80
21.00 S/ 45,460.80
80.00 S/ 141,504.00
Err:520 Err:520
9 S/ 50,089.70
9 S/ 39,715.65
9 S/ 23,578.35
9 S/ 21,273.02
8 S/ 15,835.57
8 S/ 10,712.62
8 S/ 50,671.74
Err:520
Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
105.00 S/ 2,415.00
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
SUB GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Centro de Costo
TOTAL
CANT. TOTAL
(S/)
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
0.00 S/ -
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
0.00 S/ -
0.00 S/ -
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
2.00 S/ 856.00
1.00 S/ 497.00
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
SUB GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Centro de Costo
TOTAL
CANT. TOTAL
(S/)
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
0.00 S/ -
Err:520 Err:520
0 S/ -
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
SUB GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Centro de Costo
TOTAL
CANT. TOTAL
(S/)
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
0 Err:520
0 S/ -
Err:520 Err:520
Err:520 Err:520
1 Err:520
Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
1 Err:520
Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
3 S/ 1,140.00
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520
Centro de Costo
SUB GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Centro de Costo
TOTAL
CANT. TOTAL
(S/)
TOTAL
CANT. TOTAL
(S/)
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
CONSOLIDADO 2023
Ejercicio Fiscal 2023
(Detallado)
Centro de Costo
2 6 2 3 2 5 BIENES
Construccion de obras exteriores : OBRAS PRELIMINARES
2 6 2 3 2 5 CD-B Err:520 hm 7.00 0 0 0 0 0 Err:520 0 0 0 0 0 0
2 6 2 3 2 5 CD-B Err:520 hm 12.00 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B RETROVISOR DERECHO, IZQUIERDOY LATERAL UND 788.00 Err:520 Err:520 Err:520 Err:520 0 1.00 0 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 0 0 0 0 0 0
2 6 2 3 2 5 CD-B PARTES DIARIOS DE EQUIPO/MAQUINARIA X 50 HOJAS (AUTOCOPIATIVO 1X3 COPIAS) TAL 23.00 0 0 105 0 0 0.00 0 0 0 0 0 0
2 6 2 3 2 5 CD-B NOTAS DE SALIDA DE ALMACEN (1X3 COPIAS) AUTOCOPIATIVO X 50 HOJAS TALONARIO 23.00 Err:520 Err:520 Err:520 Err:520 0 0.00 0 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B SELLO AUTOMATIVO SEGÚN MODELO UNIDAD 27.00 Err:520 Err:520 Err:520 Err:520 0 0.00 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 0 0 0 0 0 0
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 0 0 0 0 0 0
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 0 0 0 0 0 0
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 0 0 0 0 0 0
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 0 0 0 0 0 0
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 5 CD-B Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 0 Err:520 0 0 Err:520 Err:520 Err:520 Err:520
SUB GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Centro de Costo
2 6 2 3 2 5 CD-B LENTES DE SEGURIDAD CONTRA RAYOS LV COLOR OSCURO UND 20.00 Err:520 Err:520 Err:520 Err:520 0 0.00 0 0 Err:520 Err:520 Err:520 Err:520
Centro de Costo
Centro de Costo
2 6 2 3 2 4 PERSONAL
2 6 2 3 2 4 CD-P OPERARIO mes 2,529.60 0 0 3 7 7 6 9.00 9 7 5 0 0
2 6 2 3 2 4 CD-P OFICIAL mes 2,164.80 0 0 3 3 2 1 4.00 4 2 2 0 0
2 6 2 3 2 4 CD-P PEON mes 1,768.80 0 0 14 14 12 9 10.00 10 8 3 0 0
2 6 2 3 2 4 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 4 GG-P RESIDENTE DE OBRA MES 5,565.52 0 1 1 1 1 1 1 1 1 1 0 0
2 6 2 3 2 4 GG-P ASISTENTE TECNICO I MES 4,412.85 0 1 1 1 1 1 1 1 1 1 0 0
2 6 2 3 2 4 GG-P ASISTENTE ADMINISTRATIVO MES 2,619.82 0 1 1 1 1 1 1 1 1 1 0 0
2 6 2 3 2 4 GG-P MAESTRO DE OBRA MES 2,363.67 0 1 1 1 1 1 1 1 1 1 0 0
2 6 2 3 2 4 GG-P ALMACENERO MES 1,979.45 0 0 1 1 1 1 1 1 1 1 0 0
2 6 2 3 2 4 GG-P GUARDIÁN MES 1,339.08 0 0 1 1 1 1 1 1 1 1 0 0
2 6 2 3 2 4 GS-P SUPERVISOR DE OBRA MES 6,333.97 0 1 1 0 1 1 1 1 1 1 0 0
2 6 2 3 2 6 SERVICIO
2 6 2 3 2 6 Err:520 Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 6 Err:520 Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 6 Err:520 Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 0 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 6 Err:520 Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 6 GG-S Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 Err:520 0 0 0 0 0
2 6 2 3 2 6 CD-S Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 6 CD-S Err:520 Err:520 Err:520 0 0 0 0 0 Err:520 Err:520 Err:520 0 0 0 0
2 6 2 3 2 6 CD-S ZAPATO PUNTA ACERO PARA EL PERSONAL TECNICO PAR 380.00 0 0 0 0 0 1 1 1 0 0 0 0
2 6 2 3 2 6 CD-S SERVICIO DE ESTUDIO DE MECANICA DE SUELOS GLB 1,100.00 0 0 0 0 0 1 0 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 6 CD-S Err:520 Err:520 Err:520 5 0 Err:520 Err:520 Err:520 Err:520 Err:520
2 6 2 3 2 6 CD-S Err:520 Err:520 Err:520 5 0 Err:520 Err:520 Err:520 Err:520 Err:520
BIENES
Adquisicion de mobiliario urbano : MOBILIARIO EN ESPACIOS PUBLICOS
TOTAL PRESUPUESTO
Centro de Costo
N° CÓDIGO DE Unidad de P.U
Detalle Especifica Descripcion
Ord. CUBSO Medida (Referencial)
SUB GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Centro de Costo
COSTO DIRECTO GLB 1 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 ### ###
GASTOS GENERALES GLB 1 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 ### ###
GASTOS DE SUPERVISION GLB 1 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 ### ###
GASTOS PROGRAMADOS 1 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 Err:520 ### ###
CONSOLIDADO 2023
Ejercicio Fiscal 2023
(Detallado)
PROVINCIA DE CANCHIS-CUSCO
Centro de Costo
TOTAL
CANT. TOTAL
(S/)
Err:520
Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
105.00 S/ 2,415.00
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
SUB GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Centro de Costo
TOTAL
CANT. TOTAL
(S/)
Err:520 Err:520
0.00 S/ -
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
0.00 S/ -
0.00 S/ -
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
2.00 S/ 856.00
1.00 S/ 497.00
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
0.00 S/ -
Err:520 Err:520
0 S/ -
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
SUB GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Centro de Costo
TOTAL
CANT. TOTAL
(S/)
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
0 Err:520
0 S/ -
SUB GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Centro de Costo
TOTAL
CANT. TOTAL
(S/)
Err:520 Err:520
Err:520 Err:520
1 Err:520
Err:520
53.00 S/ 134,068.80
21.00 S/ 45,460.80
80.00 S/ 141,504.00
Err:520 Err:520
9 S/ 50,089.70
9 S/ 39,715.65
9 S/ 23,578.35
9 S/ 21,273.02
8 S/ 15,835.57
8 S/ 10,712.62
8 S/ 50,671.74
Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
3 S/ 1,140.00
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
Err:520 Err:520
1 Err:520
Err:520
Centro de Costo
SUB GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Centro de Costo
TOTAL
CANT. TOTAL
(S/)
TOTAL
CANT. TOTAL
(S/)
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
PLANILLA DE METRADO EXP TEC.
01.01.10.02 PISO DE CONCRETO FC=175KG/CM2 E=4" SIN COLOREAR FROTACHADO MEZC m2 562.12
01.01.11 PINTURAS
01.01.12 JARDINERIA
01.01.12.02 RELLENO CON TIERRA DE CHACRA EN AREAS VERDES CON MATERIAL DE m3 155.88
01.01.14.02.01 EXCAVACION DE ZANJA PARA POZO A TIERRA (EN TERRENO COMPACTO) m3 4.95
02.01.01 MOBILIARIO
02.01.02 EQUIPAMIENTO
PROYECTO: MEJORAMIENTO DE LA PLAZA DEL CENTRO POBLADO DE PHINAYA DE DISTRITO DE PITUMARCA, PROVINCIA DE CANCHIS - CUSCO
LUGAR: CUSCO - CANCHIS - PITUMARCA
Medida P. P. METRDO SALDO DE
MAYORES.M. METRDO P.N,
Item Descripción Und. Cant. Nº Veces Parcial Total EJECUTADAS MAYORES. METRADO P.N, EJECUT. METRADO
Largo Ancho Alto EJECUT. EJECUT.
EXT M. ACUMULD. S
01 COMPONENTE 01: ADECUADA INFRAESTRUCTURA PARA LA RECREACION
01.01.01.01 ALQUILER DE LOCAL PARA ALMACEN DE OBRA Y RESIDENCIA mes 3.00 3.00
3.00 3.00
1.00 1 1.00
01.01.01.04 CARTEL DE IDENTIFICACIÓN DE LA OBRA 3.60X2.40 CON GIGANTOGRA und 1.00 1.00
1.00 1 1.00
1.00 1 1.00
1.00 1 1.00
1.00 1 1.00
1.00 1 1.00
1.00 1 1.00
01.01.04.05 EXCAVACION DE ZANJA PARA FALSA ZAPATA EN TERRENO NORMAL m3 74.09 74.09
43.08 1 43.08
642.56 1 642.56
111.12 1 111.12
240.00 1 240.00
01.01.07.01.01 SOLADO E=4" MEZCLA 1:10 INCL. CURADO m2 64.74 64.74 108.33 108.33
1223.55
01.01.07.01.06 ACERO fy=4200 kg/cm2 GRADO 60 EN MUROS DE CONTENCION kg 1817.81 1817.81 218.31 218.31
1817.81
01.01.07.01.07 FALSA ZAPATA CONCRETO CICLOPEO F´C=175KG/CM2 + 30% PG m3 69.23 69.23 0.00
15.75
01.01.09.01 TARRAJEO DE TIPO RAYADO O PRIMARIOC/MORTERO 1:5 (PEDESTAL) m2 14.28 0.2142 7.56 1.51
01.01.09.02 REVESTIMIENTO Y FORJADO DE GRADAS DE ESCALERA ACABADO FR m2 256.38 7.69 271.62 67.91
01.01.09.03 TARRAJEO DE SUPERFICIE DE SARDINELES CON CEMENTO-ARENA m2 358.96 5.38 190.15 38.03
01.01.10.01 PISO DE CONCRETO FC=175KG/CM2 E=4" C/COLOR FROTACHADO MEZC m2 Area 76.54
01.01.10.02 PISO DE CONCRETO FC=175KG/CM2 E=4" SIN COLOREAR FROTACHADO m2 AREA 562.12
01.01.10.06 PISO DE CONCRETO FC=175KG/CM2 C/COLOR FROTACHADO MEZCLA 1 m2 76.59 76.59 15.318 9.1908 6.1272
01.01.10.07 PISO DE CONCRETO FC=175KG/CM2 SIN COLOREAR FROTACHADO MEZC m2 525.36 525.36 105.072 63.0432 42.0288
01.01.10.08 CONCRETO FC=175KG/CM2 UÑA DE ANCLAJE PARA CONCRETO EMBO m3 4.01 4.01 0.802 0.4812 0.3208
01.01.10.09 CONCRETO FC=175KG/CM2 PARA ENBOQUILLADO m3 20.32 20.32 4.064 2.4384 1.6256
01.01.10.10 EMPEDRADO PARA PISOS EMBOQUILLADO m2 135.48 135.48 27.096 16.2576 10.8384
01.01.11 PINTURAS
01.01.12 JARDINERIA
01.01.12.02 RELLENO CON TIERRA DE CHACRA EN AREAS VERDES CON MATERIA m3 155.88
8.00 3 24.00
01.01.13.01 EXCAVACION DE ZANJAS PARA INSTALACION DE AGUA PARA RIEGO m3 30.40 23.88
8.00 1 8.00
1.00 1 10 10.00
01.01.14.01.04 CONCRETO CICLOPEO F´C= 175KG/CM2 + 30% DE PG PARA CIMEN m3 9.00 9.00
01.01.14.02.01 EXCAVACION DE ZANJA PARA POZO A TIERRA (EN TERRENO COMPA m3 4.95
1.00 1 1.00
01.01.14.02.02 POZO PUESTA A TIERRA PLAZA INC. INSTALACION und 1.00 0.044
1.00 1 1.00
1.00 1 1.00
1.00
01.01.15.02 MITIGACION POR IMPACTOS NEGATIVOS EN EL AIRE (RUIDOS, POLVOS glb 1.00 1 1.00 1.00
1.00 4 4.00
01.01.16.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 30.00 30.00
30.00 1 30.00
2.00 1 2.00
2.00 1 2.00
01.01.19 PLACAS
02.01.01 MOBILIARIO
24.00 1 24.00
24.00
02.01.01.02 PARASOL EN ESPACIOS PUBLICOS und 24.00 1 24.00
02.01.02 EQUIPAMIENTO
8.00 8.00
1.00 1.00
4.00 4.00
01 JORNAL
399.01
COSTO DIRECTO - PERSONAL CD-P 1.1.
COSTO DIRECTO - BIENES CD-B 1.2.
COSTO DIRECTO - SERVICIOS CD-S 1.3.
GASTOS GENERALES - PERSONAL GG-P 2.1.
GASTOS GENERALES - BIENES GG-B 2.2.
GASTOS GENERALES - SERVICIOS GG-S 2.3.
GASTOS DE GESTION - PERSONAL GM-P 3.1.
GASTOS DE GESTION - BIENES GM-B 3.2.
GASTOS DE GESTION - SERVICIOS GM-S 3.3.
PLAN DE MONITOREO ARQUEOLOGICO - PERSONAL GA-P 4.1.
PLAN DE MONITOREO ARQUEOLOGICO - BIENES GA-B 4.2.
PLAN DE MONITOREO ARQUEOLOGICO - SERVICIOS GA-S 4.3.
GASTOS DE SUPERVISION - PERSONAL GS-P 5.1.
GASTOS DE SUPERVISION - BIENES GS-B 5.2.
GASTOS DE SUPERVISION - SERVICIOS GS-S 5.3.