Está en la página 1de 80

ANEXO A N° 04

CRONOGRAMA DE EJECUCIÓN DE LA OBRA - 2019


PROYECTO: "AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA PARA RIEGO PALLQA - PAMPA WIÑAY, DE LOS DISTRITOS DE PARAS Y TOTOS, PROVINCIA DE CANGALLO-AYACUCHO”.
DEPARTAMENTO : AYACUCHO DISTRITO : PARAS Y TOTOS
PROVINCIA : CANGALLO LUGAR :PAMPA WIÑAY, SAN ISIDRO, SAN ANTONIO, SAN MARCOS Y
MONTO VALOR REFERENCIAL S/. 8,113,104.64 NUEVO CANGALLO.
ASIGNACIÓN PRESUPUESTAS S/. 3,668,109.58
FUENTE FINANCIAMIENTO : RECURSOS ORDINARIOS
2019
COD DESCRIPCION DE UNID. PPTO ACUM. ANTERIOR SALDO AL 31 DIC 2018 14 al 31 ENERO 01 AL 28 FEBRERO 01 AL 31 MARZO 01 AL 30 ABRIL 01 AL 31 MAYO 01 AL 30 JUNIO 01 AL 31 JULIO 01 AL 31 AGOSTO 01 AL 30 SETIEMBRE 01 AL 31 OCTUBRE 01 AL 30 NOVIEMBRE 01 AL 31 DICIEMBREEJECUTADOS (ENE - DIC) 2019
SALDO AL 31 DIC 2019
PAR PARTIDA MED. TOTAL % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/.
01 ADECUADA INFRAESTRUCTURA DE RIEGO 6,885,946.01
01.01 OBRAS PROVISIONALES 24,316.00
01.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 5.0mx3.0m und 750.00 100.0% 750.00 0.00% - 0.00% - 0.00% -
01.01.02 CAMPAMENTO TRIPLAY Y TECHO CALAMINA m2 2,838.00 100.0% 2,838.00 0.00% - 0.00% - 0.00% -
01.01.03 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS Y EQUIPO glb 20,728.00 100.0% 20,728.00 0.00% - 0.00% - 0.00% -
01.02 CONSTRUCCION DE BOCATOMA (02 UND) 184,377.97
01.02.01 CAPTACION LATERAL DIRECTA - RIO TUCUMAYO 95,202.83
01.02.01.01 DESVIO DE RIACHUELO m 334.98 100.0% 334.98 0.00% - 0.00% - 0.00% -
01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 898.70 100.0% 898.70 0.00% - 0.00% - 0.00% -
01.02.01.03 EXCAVACION CON MAQUINARIA m3 2,528.64 45.8% 1,158.96 54.17% 1,369.68 54.2% 1,369.68 54.17% 1,369.68 0.00% -
01.02.01.04 ENCOFRADO Y DESENCOFRADO m2 23,301.12 100.0% 23,301.12 0.00% - 0.00% - 0.00% -
01.02.01.05 CONCRETO f'c=140 kg/cm2+30%PM m3 26,040.73 48.4% 12,604.56 51.60% 13,436.17 51.6% 13,436.17 51.60% 13,436.17 0.00% -
01.02.01.06 CONCRETO f'c=175 kg/cm2 m3 41,585.53 35.2% 14,634.40 64.81% 26,951.13 64.8% 26,951.13 64.81% 26,951.13 0.00% -
01.02.01.07 COMPUERTA METALICA m3 513.13 0.0% - 100.00% 513.13 100.0% 513.13 100.00% 513.13 0.00% -
01.02.02 BOCATOMA - RIO CHALANA 89,175.14
01.02.02.01 DESVIO DE RIACHUELO m 758.48 - 100.00% 758.48 100.0% 758.48 100.00% 758.48 0.00% -
01.02.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 712.74 - 100.00% 712.74 78.51% 559.55 21.5% 153.17 100.00% 712.72 0.00% -
01.02.02.03 EXCAVACION CON MAQUINARIA m3 3,130.25 - 100.00% 3,130.25 42.63% 1,334.56 13.04% 408.18 44.3% 1,387.64 100.00% 3,130.38 0.00% -
01.02.02.04 ENCOFRADO Y DESENCOFRADO m2 20,536.24 - 100.00% 20,536.24 59.19% 12,155.40 23.71% 4,869.14 17.1% 3,511.70 100.00% 20,536.24 0.00% -
01.02.02.05 CONCRETO f'c=140 kg/cm2+30%PM m3 15,041.44 - 100.00% 15,041.44 41.15% 6,189.55 11.37% 1,710.21 47.5% 7,141.68 100.00% 15,041.44 0.00% -
01.02.02.06 CONCRETO f'c=175 kg/cm2 m3 48,114.73 - 100.00% 48,114.73 5.37% 2,583.76 2.69% 1,294.29 91.9% 44,236.68 100.00% 48,114.73 0.00% -
01.02.02.07 COMPUERTA METALICA und 513.13 - 100.00% 513.13 100.0% 513.13 100.00% 513.13 0.00% -
01.02.02.08 REJILLA METALICA und 368.13 - 100.00% 368.13 100.0% 368.13 100.00% 368.13 0.00% -
01.03 GAVIONES (L=80m, L=265m, L=150m) 908,358.44
01.03.01 LIMPIEZA DEL TERRENO MANUAL m2 2,910.60 30.3% 882.00 69.70% 2,028.60 10.10% 293.97 10.10% 293.97 20.20% 587.94 49.50% 1,440.66
01.03.02 TRAZO Y REPLANTEO PRELIMINAR m2 9,405.00 30.3% 2,850.00 69.70% 6,555.00 10.10% 949.91 10.10% 949.91 20.20% 1,899.81 49.50% 4,655.19
01.03.03 EXCAVACION C/ MAQUINARIA EN EL LECHO DEL RIACHUELO m3 68,879.10 44.4% 30,607.08 55.56% 38,272.02 4.46% 3,072.01 4.46% 3,072.01 8.92% 6,144.02 46.64% 32,128.00
01.03.04 EXCAVACION EN ROCA FIJA m3 33,324.00 100.0% 33,324.00 0.00% - 0.00% - 0.00% -
01.03.05 RELLENO CON MATERIAL PROPIO m3 2,294.33 30.3% 695.25 69.70% 1,599.08 3.03% 69.52 7.07% 162.21 2.75% 63.16 12.85% 294.89 56.84% 1,304.19
01.03.06 ACARREO DE PIEDRAS PARA RELLENO m3 40,748.40 58.3% 23,769.90 41.67% 16,978.50 12.63% 5,146.52 12.63% 5,146.52 25.26% 10,293.05 16.41% 6,685.45
01.03.07 GAVION EXAGONAL TIPO CAJA (5mx1mx1m) m3 146,667.51 100.0% 146,667.51 0.00% - 0.00% - 0.00% -
01.03.08 GAVION EXAGONAL TIPO COLCHON (5mx2mx0.3m) m3 604,129.50 13.0% 78,799.50 86.96% 525,330.00 1.30% 7,853.68 3.04% 18,365.54 0.5% 3,020.65 2.24% 13,532.50 7.08% 42,772.37 79.88% 482,557.63
01.04 CONSTRUCCION DE DESARENADOR (02 UND) 11,975.07
01.04.01 TRAZO Y REPLANTEO PRELIMINAR m2 71.20 50.2% 35.77 49.77% 35.44 49.77% 35.44 49.77% 35.44 0.00% -
01.04.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 3,593.27 52.6% 1,891.71 47.35% 1,701.55 47.35% 1,701.41 47.35% 1,701.41 0.00% -
01.04.03 CONCRETO f'c=100 kg/cm2 PARA SOLADOS m3 349.64 54.0% 188.89 45.98% 160.76 45.98% 160.77 45.98% 160.77 0.00% -
01.04.04 CONCRETO f'c=175 kg/cm2 m3 2,141.08 50.3% 1,077.16 49.69% 1,063.92 49.69% 1,063.90 49.69% 1,063.90 0.00% -
01.04.05 ENCOFRADO Y DESENCOFRADO m2 1,955.02 53.6% 1,047.84 46.40% 907.18 46.40% 907.13 46.40% 907.13 0.00% -
01.04.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 1,264.59 54.2% 685.09 45.83% 579.50 45.83% 579.56 45.83% 579.56 0.00% -
01.04.07 TARRAJEO Y SOLAQUEO DE ESTRUCTURA m2 798.21 50.5% 402.79 49.54% 395.42 49.54% 395.43 49.54% 395.43 0.00% -
01.04.08 COMPUERTA METALICA DESARENADOR und 1,065.80 50.0% 532.90 50.00% 532.90 50.0% 532.90 50.00% 532.90 0.00% -
01.04.09 REJILLA METALICA DESARENADOR und 736.26 50.0% 368.13 50.00% 368.13 50.00% 368.13 50.00% 368.13 0.00% -
01.05 LINEA DE CONDUCCION PRINCIPAL 4,607,341.30
01.05.01 LINEA DE CONDUCCION CON TUB. PVC (L=20.3Km) 4,529,008.17
01.05.01.01 LIMPIEZA DEL TERRENO MANUAL m2 13,388.76 35.1% 4,695.18 64.93% 8,693.58 9.44% 1,264.20 53.93% 7,220.64 1.56% 208.74 64.93% 8,693.58 0.00% -
01.05.01.02 TRAZO, NIVELACION Y REPLANTEO EN CANAL km 31,649.65 23.1% 7,297.78 76.94% 24,351.87 3.93% 1,244.82 35.00% 11,078.93 23.89% 7,562.31 12.49% 3,952.32 1.62% 513.49 0.01% 3.16 76.94% 24,355.03 0.00% -
01.05.01.03 EXCAVACION DE ZANJA, MATERIAL SUELTO m3 919,986.09 16.9% 155,381.47 83.11% 764,604.62 0.08% 781.42 2.59% 23,825.98 4.3% 39,427.99 1.66% 15,301.44 0.6% 5,466.05 0.2% 1,889.24 0.14% 1,287.98 7.00% 64,399.03 15.0% 137,997.91 14.0% 128,798.05 45.56% 419,175.09 37.56% 345,429.54
01.05.01.04 EXCAVACION EN ROCA SUELTA m3 105,493.21 4.4% 4,631.74 95.61% 100,861.46 6.49% 6,846.84 28.14% 29,684.46 14.71% 15,514.07 20.92% 22,072.91 13.01% 13,724.67 83.27% 87,842.95 12.34% 13,018.51
01.05.01.05 EXCAVACION DE ZANJA, EN ROCA FIJA m3 203,540.88 8.3% 16,824.85 91.73% 186,716.03 55.00% 111,947.49 5.00% 5,274.66 5.00% 10,177.04 65.00% 127,399.19 26.73% 59,316.84
01.05.01.06 REFINE, PERFILADO Y NIVELACION ZANJA m2 69,474.61 30.7% 21,312.42 69.32% 48,162.18 1.08% 750.33 1.18% 819.80 15.00% 10,421.19 10.00% 20,354.09 10.00% 6,947.46 37.26% 39,292.87 32.06% 8,869.32
01.05.01.07 COLOCACION DE CAMA DE APOYO e=10 cm m 19,117.72 18.2% 3,477.06 81.81% 15,640.66 1.38% 263.82 1.18% 225.59 25.00% 4,779.43 10.00% 6,947.46 10.00% 1,911.77 47.56% 14,128.08 34.25% 1,512.58
01.05.01.08 RELLENO CON MATERIAL PROPIO m3 32,679.10 16.6% 5,421.34 83.41% 27,257.76 0.79% 258.16 1.18% 385.61 6.84% 2,233.81 20.00% 3,823.54 20.00% 6,535.82 48.81% 13,236.95 34.60% 14,020.80
01.05.01.09 TUBERIA PVC NTP ISO 1452, UF C-5. D=200mm m 31,137.20 0.0% - 100.00% 31,137.20 100.00% 31,137.20 100.00% 31,137.20 0.00% -
01.05.01.10 TUBERIA PVC-U NTP ISO 1452, D=355mm C-5 m 2,765,005.00 23.3% 643,388.06 76.73% 2,121,616.94 1.66% 45,766.36 34.6% 956,691.73 7.00% 193,550.35 6.10% 168,665.31 49.36% ### 27.38% 756,943.19
01.05.01.11 TUBERIA PVC-U NTP ISO 1452, D=250mm C-5 m 236,184.82 0.0% - 100.00% 236,184.82 - 100.00% 236,184.82
01.05.01.12 SUMNISTRO E INSTALACION DE ACCESORIOS PVC und 81,013.13 29.8% 24,141.91 70.20% 56,871.22 2.00% 1,620.26 9.0% 7,291.18 7.0% 5,670.92 7.00% 5,670.92 25.00% 20,253.28 45.20% 36,617.93
01.05.01.13 PRUEBA HIDRAULICA DE TUBERIA m 20,338.00 16.2% 3,300.00 83.77% 17,038.00 10.00% 2,033.80 5.0% 1,016.90 5.00% 1,016.90 20.00% 4,067.60 63.77% 12,970.40
01.05.02 CANAL ACUEDUCTO SUBTERRANEO (L=131m) 78,333.13
01.05.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 622.25 - 100.00% 622.25 100.0% 622.25 100.00% 622.25 0.00% -
01.05.02.02 DESVIO DE RIACHUELO m 4,249.20 - 100.00% 4,249.20 100.0% 4,249.20 100.00% 4,249.20 0.00% -
01.05.02.03 EXCAVACION C/ MAQUINARIA EN EL LECHO DEL RIACHUELO m3 5,980.94 - 100.00% 5,980.94 100.0% 5,980.94 100.00% 5,980.94 0.00% -
01.05.02.04 RELLENO CON MATERIAL PROPIO m3 109.29 - 100.00% 109.29 100.0% 109.29 100.00% 109.29 0.00% -
01.05.02.05 CONCRETO f'c=100 kg/cm2 PARA SOLADOS m3 4,738.28 - 100.00% 4,738.28 100.0% 4,738.28 100.00% 4,738.28 0.00% -
01.05.02.06 CONCRETO f'c=210 kg/cm2 m3 26,167.41 - 100.00% 26,167.41 100.0% 26,167.41 100.00% 26,167.41 0.00% -
01.05.02.07 ENCOFRADO Y DESENCOFRADO m2 12,098.11 - 100.00% 12,098.11 100.0% 12,098.11 100.00% 12,098.11 0.00% -
01.05.02.08 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 24,367.64 - 100.00% 24,367.64 100.0% 24,367.64 100.00% 24,367.64 0.00% -
01.06 OBRAS DE ARTE 325,390.43
01.06.01 TOMA LATERAL C/ LIMPIA (59 UND) 299,202.01
01.06.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 1,034.12 8.5% 87.64 91.53% 946.49 3.39% 35.06 20.0% 206.82 15.0% 155.12 38.39% 397.00 53.14% 549.49
01.06.01.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 14,862.05 8.5% 1,259.50 91.53% 13,602.56 3.39% 503.82 20.0% 2,972.41 15.5% 2,303.62 38.89% 5,779.85 52.64% 7,822.70
01.06.01.03 CONCRETO f'c=100 kg/cm2 PARA SOLADOS m3 4,268.07 8.5% 361.70 91.53% 3,906.37 3.39% 144.69 20.0% 853.61 15.0% 640.21 38.39% 1,638.51 53.14% 2,267.86
01.06.01.04 CONCRETO f'c=210 kg/cm2 m3 73,658.26 8.5% 6,242.23 91.53% 67,416.03 3.39% 2,497.01 20.0% 14,731.65 15.0% 11,048.74 38.39% 28,277.40 53.14% 39,138.63
01.06.01.05 ENCOFRADO Y DESENCOFRADO m2 43,841.63 8.5% 3,715.39 91.53% 40,126.23 6.78% 2,972.46 20.0% 8,768.33 15.0% 6,576.24 41.78% 18,317.03 49.75% 21,809.20
01.06.01.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 17,494.75 8.5% 1,482.62 91.53% 16,012.13 3.39% 593.07 20.0% 3,498.95 15.0% 2,624.21 38.39% 6,716.23 53.14% 9,295.90
01.06.01.07 TARRAJEO INTERIOR Y SOLAQUEO m2 17,596.10 8.5% 1,491.20 91.53% 16,104.91 3.24% 570.11 20.0% 3,519.22 15.0% 2,639.42 38.24% 6,728.75 53.29% 9,376.16
01.06.01.08 TAPAS METALICAS ESTRIADO und 47,954.02 8.5% 4,063.90 91.53% 43,890.12 3.39% 1,625.64 14.0% 6,713.56 10.0% 4,795.40 27.39% 13,134.61 64.14% 30,755.51
01.06.01.09 ACCESORIOS Y VALVULAS D=110mm UF und 78,493.01 8.5% 6,651.95 91.53% 71,841.06 3.39% 2,660.91 15.0% 11,773.95 10.0% 7,849.30 28.39% 22,284.17 63.14% 49,556.89
01.06.02 CAMARA DE CARGA Y DESCARGA SIFON (08 UND) 15,849.86
01.06.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 62.70 51.7% 32.40 48.33% 30.31 26.7% 16.72 15.0% 9.41 41.67% 26.13 6.66% 4.18
01.06.02.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 898.93 54.0% 485.28 46.02% 413.66 29.0% 260.51 15.0% 134.84 43.98% 395.35 2.04% 18.31
01.06.02.03 CONCRETO f'c=100 kg/cm2 PARA SOLADOS m3 241.13 55.0% 132.62 45.00% 108.51 10.0% 24.11 10.00% 24.11 35.00% 84.40
01.06.02.04 CONCRETO f'c=210 kg/cm2 m3 5,701.99 44.6% 2,542.29 55.41% 3,159.70 10.0% 570.20 10.00% 570.20 45.41% 2,589.50
01.06.02.05 ENCOFRADO Y DESENCOFRADO m2 2,787.61 49.9% 1,391.67 50.08% 1,395.94 15.0% 418.14 15.00% 418.14 35.08% 977.79
01.06.02.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 2,571.86 25.0% 642.97 75.00% 1,928.90 20.0% 514.37 20.00% 514.37 55.00% 1,414.52
01.06.02.07 TARRAJEO INTERIOR Y SOLAQUEO m2 643.39 51.3% 329.74 48.75% 313.65 10.0% 64.34 10.00% 64.34 38.75% 249.31
01.06.02.08 TAPA METALICA EN CAMARA und 2,942.24 50.0% 1,471.12 50.00% 1,471.12 10.0% 294.22 10.00% 294.22 40.00% 1,176.90
01.06.03 CAMARA DE PURGA SIFON (04 UND) 10,338.56
01.06.03.01 TRAZO Y REPLANTEO PRELIMINAR m2 42.75 50.0% 21.38 50.00% 21.38 10.0% 4.28 10.00% 4.28 40.00% 17.10
01.06.03.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 750.76 43.8% 328.46 56.25% 422.30 20.0% 150.15 20.00% 150.15 36.25% 272.15
01.06.03.03 CONCRETO f'c=100 kg/cm2 PARA SOLADOS m3 128.60 50.0% 64.30 50.00% 64.30 10.0% 12.86 10.00% 12.86 40.00% 51.44
01.06.03.04 CONCRETO f'c=210 kg/cm2 m3 1,961.19 48.4% 948.82 51.62% 1,012.38 14.0% 274.57 14.00% 274.57 37.62% 737.81
01.06.03.05 ENCOFRADO Y DESENCOFRADO m2 1,679.39 48.5% 814.12 51.52% 865.27 14.0% 235.11 14.00% 235.11 37.52% 630.15
01.06.03.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 974.03 25.0% 243.51 75.00% 730.52 20.0% 194.81 20.00% 194.81 55.00% 535.72
01.06.03.07 TAPA METALICA CAMARA PURGA und 1,251.12 50.0% 625.56 50.00% 625.56 15.0% 187.67 15.00% 187.67 35.00% 437.89
01.06.03.08 ACCESORIOS PARA VALVULA DE PURGA und 3,550.72 50.0% 1,775.36 50.00% 1,775.36 14.0% 497.10 14.00% 497.10 36.00% 1,278.26
01.07 CONSTRUCCION DE CANAL CRUCE AEREO (06 UND) 46,627.57
01.07.01 CRUCE AEREO L=9m (01 UND) 3,265.87
01.07.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 29.83 100.0% 29.83 0.00% - 0.00% - 0.00% -
01.07.01.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 185.22 100.0% 185.22 0.00% - 0.00% - 0.00% -
01.07.01.03 CONCRETO f'c=175 kg/cm2 m3 604.80 100.0% 604.80 0.00% - 0.00% - 0.00% -
01.07.01.04 CONCRETO f'c=210 kg/cm2 m3 712.75 100.0% 712.75 0.00% - 0.00% - 0.00% -
01.07.01.05 ENCOFRADO Y DESENCOFRADO m2 1,076.26 93.2% 1,003.08 6.80% 73.17 0.00% - 6.80% 73.17
01.07.01.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 657.01 100.0% 657.01 0.00% - 0.00% - 0.00% -
01.07.02 CRUCE AEREO L=12m (02 UND) 8,103.37
01.07.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 79.80 50.0% 39.90 50.00% 39.90 50.0% 39.90 50.00% 39.90 0.00% -
01.07.02.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 148.18 100.0% 148.18 0.00% - 0.00% - 0.00% -
01.07.02.03 CONCRETO f'c=175 kg/cm2 m3 1,262.58 50.0% 631.29 50.00% 631.29 50.0% 631.29 50.00% 631.29 0.00% -
01.07.02.04 CONCRETO f'c=210 kg/cm2 m3 1,897.64 100.0% 1,897.64 0.00% - 0.00% - 0.00% -
01.07.02.05 ENCOFRADO Y DESENCOFRADO m2 2,813.18 77.9% 2,190.87 22.12% 622.31 22.12% 622.28 22.12% 622.28 0.00% -
01.07.02.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 1,902.00 83.7% 1,591.96 16.30% 310.03 16.3% 310.03 16.30% 310.03 0.00% -
01.07.03 CRUCE AEREO L=18m (02 UND) 22,732.78
01.07.03.01 TRAZO Y REPLANTEO PRELIMINAR m2 114.00 - 100.00% 114.00 100.0% 114.00 100.00% 114.00 0.00% -
01.07.03.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 1,307.65 - 100.00% 1,307.65 100.0% 1,307.65 100.00% 1,307.65 0.00% -
01.07.03.03 CONCRETO f'c=175 kg/cm2 m3 6,462.97 - 100.00% 6,462.97 100.0% 6,462.97 100.00% 6,462.97 0.00% -
01.07.03.04 CONCRETO f'c=210 kg/cm2 m3 5,756.47 - 100.00% 5,756.47 100.0% 5,756.47 100.00% 5,756.47 0.00% -
01.07.03.05 ENCOFRADO Y DESENCOFRADO m2 5,271.17 - 100.00% 5,271.17 100.0% 5,271.17 100.00% 5,271.17 0.00% -
01.07.03.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 3,820.52 - 100.00% 3,820.52 100.0% 3,820.52 100.00% 3,820.52 0.00% -
01.07.04 CRUCE AEREO L=20m (01 UND) 12,525.55
01.07.04.01 TRAZO Y REPLANTEO PRELIMINAR m2 62.70 - 100.00% 62.70 100.0% 62.70 100.00% 62.70 0.00% -
01.07.04.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 653.83 - 100.00% 653.83 100.0% 653.83 100.00% 653.83 0.00% -
01.07.04.03 CONCRETO f'c=175 kg/cm2 m3 3,266.80 - 100.00% 3,266.80 100.0% 3,266.80 100.00% 3,266.80 0.00% -
01.07.04.04 CONCRETO f'c=210 kg/cm2 m3 3,196.02 - 100.00% 3,196.02 100.0% 3,196.02 100.00% 3,196.02 0.00% -
01.07.04.05 ENCOFRADO Y DESENCOFRADO m2 3,076.03 - 100.00% 3,076.03 100.0% 3,076.03 100.00% 3,076.03 0.00% -
01.07.04.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 2,270.17 - 100.00% 2,270.17 100.0% 2,270.17 100.00% 2,270.17 0.00% -
01.08 CONSTRUCCION DE RESERVORIO C°A° (04 UND) 524,339.53
01.08.01 RESERVORIO DE V=300m3 (03 UND) 321,669.46
01.08.01.01 LIMPIEZA DEL TERRENO MANUAL m2 873.18 - 100.00% 873.18 0.00% - 100.00% 873.18
01.08.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 2,137.50 - 100.00% 2,137.50 0.00% - 100.00% 2,137.50
01.08.01.03 CORTE DE PLATAFORMA MANUAL m3 12,202.41 - 100.00% 12,202.41 33.3% 4,066.50 33.33% 4,066.50 66.67% 8,135.91
01.08.01.04 EXCAVACION MANUAL VOLUMEN RESERVORIO m3 18,522.00 - 100.00% 18,522.00 33.3% 6,167.82 33.30% 6,167.82 66.70% 12,354.18
01.08.01.05 ELIMINACION DE MATERIAL EXCEDENTE m3 21,649.61 - 100.00% 21,649.61 33.3% 7,209.32 33.30% 7,209.32 66.70% 14,440.29
01.08.01.06 PERFILADO Y COMPACTADO DEL RESERVORIO m2 15,650.64 - 100.00% 15,650.64 33.3% 5,211.66 33.30% 5,211.66 66.70% 10,438.98
01.08.01.07 CONCRETO f'c=100 kg/cm2 PARA SOLADOS m3 6,703.53 - 100.00% 6,703.53 0.00% - 100.00% 6,703.53
01.08.01.08 CONCRETO f'c=140 kg/cm2+30%PM m3 12,874.04 - 100.00% 12,874.04 0.00% - 100.00% 12,874.04
01.08.01.09 CONCRETO f'c=210 kg/cm2 m3 84,739.91 - 100.00% 84,739.91 0.00% - 100.00% 84,739.91
01.08.01.10 ENCOFRADO Y DESENCOFRADO m2 40,978.71 - 100.00% 40,978.71 0.00% - 100.00% 40,978.71
01.08.01.11 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 73,725.52 - 100.00% 73,725.52 0.00% - 100.00% 73,725.52
01.08.01.12 TARRAJEO Y SOLAQUEO DE ESTRUCTURA m2 24,284.03 - 100.00% 24,284.03 0.00% - 100.00% 24,284.03
01.08.01.13 JUNTA WATER STOP 6" m 3,444.34 - 100.00% 3,444.34 0.00% - 100.00% 3,444.34
01.08.01.14 JUNTA DE MATERIAL ELASTOMERICO m 3,884.06 - 100.00% 3,884.06 0.00% - 100.00% 3,884.06
01.08.02 RESERVORIO DE V=400m3 (01 UND) 148,815.97
01.08.02.01 LIMPIEZA DEL TERRENO MANUAL m2 407.93 - 100.00% 407.93 0.00% - 100.00% 407.93
01.08.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 988.00 - 100.00% 988.00 0.00% - 100.00% 988.00
01.08.02.03 CORTE DE PLATAFORMA MANUAL m3 5,019.19 - 100.00% 5,019.19 0.00% - 100.00% 5,019.19
01.08.02.04 EXCAVACION MANUAL VOLUMEN RESERVORIO m3 8,232.00 - 100.00% 8,232.00 0.00% - 100.00% 8,232.00
01.08.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 9,353.64 - 100.00% 9,353.64 0.00% - 100.00% 9,353.64
01.08.02.06 PERFILADO Y COMPACTADO DEL RESERVORIO m2 4,416.81 - 100.00% 4,416.81 0.00% - 100.00% 4,416.81
01.08.02.07 CONCRETO f'c=100 kg/cm2 PARA SOLADOS m3 2,234.51 - 100.00% 2,234.51 0.00% - 100.00% 2,234.51
01.08.02.08 CONCRETO f'c=140 kg/cm2+30%PM m3 4,291.35 - 100.00% 4,291.35 0.00% - 100.00% 4,291.35
01.08.02.09 CONCRETO f'c=210 kg/cm2 m3 28,237.56 - 100.00% 28,237.56 0.00% - 100.00% 28,237.56
01.08.02.10 ENCOFRADO Y DESENCOFRADO m2 13,659.57 - 100.00% 13,659.57 0.00% - 100.00% 13,659.57
01.08.02.11 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 61,437.95 - 100.00% 61,437.95 0.00% - 100.00% 61,437.95
01.08.02.12 TARRAJEO Y SOLAQUEO DE ESTRUCTURA m2 8,094.68 - 100.00% 8,094.68 0.00% - 100.00% 8,094.68
01.08.02.13 JUNTA WATER STOP 6" m 1,148.11 - 100.00% 1,148.11 0.00% - 100.00% 1,148.11
01.08.02.14 JUNTA DE MATERIAL ELASTOMERICO m 1,294.69 - 100.00% 1,294.69 0.00% - 100.00% 1,294.69
01.08.03 CAMARA DE INGRESO (04 UND) 4,263.25
01.08.03.01 TRAZO Y REPLANTEO PRELIMINAR m2 38.57 - 100.00% 38.57 0.00% - 100.00% 38.57
01.08.03.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 501.33 - 100.00% 501.33 0.00% - 100.00% 501.33
01.08.03.03 CONCRETO f'c=210 kg/cm2 m3 2,614.97 - 100.00% 2,614.92 0.00% - 100.00% 2,614.92
01.08.03.04 ENCOFRADO Y DESENCOFRADO m2 457.50 - 100.00% 457.50 0.00% - 100.00% 457.50
01.08.03.05 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 496.74 - 100.00% 496.74 0.00% - 100.00% 496.74
01.08.03.06 TARRAJEO INTERIOR Y SOLAQUEO m2 154.15 - 100.00% 154.15 0.00% - 100.00% 154.15
01.08.04 CAMARA DE SALIDA Y PURGA (04 UND) 25,617.51
01.08.04.01 TRAZO Y REPLANTEO PRELIMINAR m2 77.14 - 100.00% 77.14 0.00% - 100.00% 77.14
01.08.04.02 EXCAVACION DE ZANJA EN MATERIAL SUELTO m3 731.84 - 100.00% 731.84 0.00% - 100.00% 731.84
01.08.04.03 EXCAVACION MANUAL PARA ESTRUCTURA m3 1,002.66 - 100.00% 1,002.66 0.00% - 100.00% 1,002.66
01.08.04.04 CONCRETO f'c=100 kg/cm2 PARA SOLADOS m3 321.51 - 100.00% 321.51 0.00% - 100.00% 321.51
01.08.04.05 CONCRETO f'c=210 kg/cm2 m3 3,631.84 - 100.00% 3,631.84 0.00% - 100.00% 3,631.84
01.08.04.06 ENCOFRADO Y DESENCOFRADO m2 821.22 - 100.00% 821.22 0.00% - 100.00% 821.22
01.08.04.07 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 1,418.26 - 100.00% 1,418.26 0.00% - 100.00% 1,418.26
01.08.04.08 TUBERIAS Y ACCESORIOS und 13,611.60 - 100.00% 13,611.60 0.00% - 100.00% 13,611.60
01.08.04.09 TAPA METALICA Y REJILLA und 4,001.44 - 100.00% 4,001.44 0.00% - 100.00% 4,001.44
ANEXO A N° 04
CRONOGRAMA DE EJECUCIÓN DE LA OBRA - 2019
PROYECTO: "AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA PARA RIEGO PALLQA - PAMPA WIÑAY, DE LOS DISTRITOS DE PARAS Y TOTOS, PROVINCIA DE CANGALLO-AYACUCHO”.
DEPARTAMENTO : AYACUCHO DISTRITO : PARAS Y TOTOS
PROVINCIA : CANGALLO LUGAR :PAMPA WIÑAY, SAN ISIDRO, SAN ANTONIO, SAN MARCOS Y
MONTO VALOR REFERENCIAL S/. 8,113,104.64 NUEVO CANGALLO.
ASIGNACIÓN PRESUPUESTAS S/. 3,668,109.58
FUENTE FINANCIAMIENTO : RECURSOS ORDINARIOS
2019
COD DESCRIPCION DE UNID. PPTO ACUM. ANTERIOR SALDO AL 31 DIC 2018 14 al 31 ENERO 01 AL 28 FEBRERO 01 AL 31 MARZO 01 AL 30 ABRIL 01 AL 31 MAYO 01 AL 30 JUNIO 01 AL 31 JULIO 01 AL 31 AGOSTO 01 AL 30 SETIEMBRE 01 AL 31 OCTUBRE 01 AL 30 NOVIEMBRE 01 AL 31 DICIEMBREEJECUTADOS (ENE - DIC) 2019
SALDO AL 31 DIC 2019
PAR PARTIDA MED. TOTAL % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/. % S/.
01.08.05 CERCO PERIMETRICO (L=135.4m) 23,973.34
01.08.05.01 TRAZO Y REPLANTEO PRELIMINAR m2 9,006.00 - 100.00% 9,006.00 0.00% - 100.00% 9,006.00
01.08.05.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 521.09 - 100.00% 521.09 0.00% - 100.00% 521.09
01.08.05.03 CONCRETO f'c=140 kg/cm2 m3 2,445.57 - 100.00% 2,445.57 0.00% - 100.00% 2,445.57
01.08.05.04 ALAMBRE DE PUAS Y TUBO NEGRO und 8,000.68 - 100.00% 8,000.68 0.00% - 100.00% 8,000.68
01.08.05.05 PUERTA METALICA m2 4,000.00 - 100.00% 4,000.00 0.00% - 100.00% 4,000.00
01.09 FLETE TERRESTRE 253,219.71
01.09.01 FLETE TERRESTRE glb 187,719.71 20.0% 37,543.94 80.00% 150,175.77 30.0% 56,315.91 30.00% 56,315.91 50.00% 93,859.86
01.09.02 FLETE RURAL glb 65,500.00 15.0% 9,825.00 85.00% 55,675.00 30.0% 19,650.00 30.00% 19,650.00 55.00% 36,025.00
02 ADECUADA CAPACITACION Y ASISTENCIA TECNICA 125,400.00
02.01 CAPACITACION EN OPERACION Y MANTENIMIENTO mes 39,000.00 - 100.00% 39,000.00 0.00% - 100.00% 39,000.00
02.02 CAPACITACION EN FORTALECIMIENTO DE USUARIOS mes 38,400.00 50.0% 19,200.00 50.00% 19,200.00 0.00% - 50.00% 19,200.00
02.03 CAPACITACION EN EL MANEJO DE CULTIVOS und 25,000.00 - 100.00% 25,000.00 0.00% - 100.00% 25,000.00
02.04 CAPACITACION EN EL MANEJO DE AGUA und 11,500.00 - 100.00% 11,500.00 0.00% - 100.00% 11,500.00
02.05 MITIGACION DEL IMPACTO AMBIENTAL glb 11,500.00 - 100.00% 11,500.00 0.00% - 100.00% 11,500.00

A COSTO DIRECTO (CD) 7,011,346.01 20.03% 1,404,413.23 79.97% 5,606,932.73 0.05% 3,290.45 0.60% 42,125.55 0.8% 54,045.87 0.70% 48,938.21 0.31% 21,493.61 0.34% 23,962.15 0.54% 38,060.01 0.62% 43,616.80 1.00% 69,897.54 21.97% 1,540,252.70 6.22% 436,326.17 5.03% 352,381.75 38.14% ### 41.83% ###
B GASTOS GENERALES (10.0% CD) 701,134.60 20.03% 140,441.32 79.97% 560,693.27 0.05% 329.04 0.60% 4,212.56 0.8% 5,404.59 0.70% 4,893.82 0.31% 2,149.36 0.34% 2,396.22 0.54% 3,806.00 0.62% 4,361.68 1.00% 6,989.75 21.97% 154,025.27 6.22% 43,632.62 5.03% 35,238.17 38.14% 267,439.08 41.83% 293,254.50
C SUB TOTAL (A+B) 7,712,480.61 1,544,854.56 6,167,626.00 3,619.49 46,338.11 59,450.46 53,832.03 23,642.97 26,358.37 41,866.01 47,978.48 76,887.30 1,694,277.97 479,958.78 387,619.92 ### ###
D GASTOS DE SUPERVISION Y LIQUIDACION (5.71 CD) 400,624.03 20.03% 80,247.31 79.97% 320,376.71 0.05% 188.01 0.60% 2,407.03 0.8% 3,088.15 0.70% 2,796.30 0.31% 1,228.13 0.34% 1,369.18 0.54% 2,174.73 0.62% 2,492.24 1.00% 3,993.90 21.97% 88,009.10 6.22% 24,931.41 5.03% 20,134.88 38.14% 152,813.06 41.83% 167,563.83
1,625,101.87 3,807.51 48,745.14 62,538.61 56,628.33 24,871.10 27,727.55 44,040.74 50,470.72 80,881.20 1,782,287.06 504,890.19 407,754.80
PRESUPUESTO DE OBRA (C+D) 8,113,104.64 20.03% 1,625,101.87 79.97% 6,488,002.71 0.05% 3,807.51 0.60% 48,745.14 0.77% 62,538.61 0.70% 56,628.33 0.31% 24,871.10 0.34% 27,727.55 0.54% 44,040.74 0.62% 50,470.72 1.00% 80,881.20 21.97% 1,782,287.06 6.22% 504,890.19 5.03% 407,754.80 38.14% ### 41.83% ###
ANEXO B N° 02
VALORIZACIÓN DEL AVANCE FISICO Nº 01 1
mes de NOVIEMBRE - 2020
PROGRAMA REGIONAL DE IRRIGACIÓ N Y DESARROLLO RURAL INTEGRADO
SUPERVISOR DE OBRA : Ing. Wilfredo Molina Rojas
COMPONENTE :MEJORAMIENTO DEL SERVICIO DE AGUA EN EL SISTEMA DE RIEGO CANAL CACHI-HUANTA, DISTRITO DE HUANTA-
HUANTA AYACUCHO RESIDENTE DE OBRA : Ing. Jean Pierre Ricardo Serpa Santa Cruz
DEPARTAMENTO : AYACUCHO
:MEJORAMIENTO DEL SERVICIO DE AGUA EN EL SISTEMA DE RIEGO CANAL CACHI-HUANTA, DISTRITO DE HUANTA-
OBRA/META HUANTA AYACUCHO PROVINCIA : HUANTA
MONTO VALOR REFERENCIAL S/. 5,291,767.49 DISTRITO : HUANTA
ASIGNACIÓ N PRESUPUESTAL S/. 850,000.00
LUGAR : PACCOSAN, AZANGARO.
EJECUCIÓ N PRESUPUESTAL DIRECTA S/. 850,000.00
FUENTE FINANCIAMIENTO : RECURSOS ORDINARIOS FECHA DE PRESENTACIÓ N : 07 DE DICIEMBRE DEL 2020
MES/AÑ O : NOVIEMBRE 2020

AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO


PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01 TRABAJOS PRELIMINARES Y OBRAS PROVISIONALES 51,822.55
01.01 CARTEL DE IDENTIFICACIÓN DE OBRA DE 3.60 X 4.80 m (Gigantografía) und 2.00 1,083.47 2,166.94 2.00 2,166.94 100.00% 0.00 0.00 0.00% 2.00 2,166.94 100.00% 0.00 0.00 0.00%
01.02 CAMPAMENTO DE OBRA (6mX4.2m) und 5.00 2,450.61 12,253.05 2.04 5,000.96 40.81% 0.00 0.00 0.00% 2.04 5,000.96 40.81% 2.96 7,252.09 59.19%
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS viaje 4.00 700.00 2,800.00 4.00 2,800.00 100.00% 0.00 0.00 0.00% 4.00 2,800.00 100.00% 0.00 0.00 0.00%
01.04 TALLER DE CAPACITACION EN SEGURIDAD EN OBRA TAL 6.00 388.76 2,332.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 2,332.56 100.00%
01.05 CINTA PLASTICA P/SEÑAL DE PELIGRO - LIMITE DE OBRA m 5,000.00 1.19 5,950.00 809.00 962.71 16.18% 0.00 0.00 0.00% 809.00 962.71 16.18% 4,191.00 4,987.29 83.82%
01.06 EQUIPOS DE PROTECICON INDIVIDUAL jgo 1.00 24,520.00 24,520.00 1.00 24,520.00 100.00% 0.00 0.00 0.00% 1.00 24,520.00 100.00% 0.00 0.00 0.00%
01.07 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA LA OBRA (IDA VJE 2.00 900.00 1,800.00 2.00 1,800.00 100.00% 0.00 0.00 0.00% 2.00 1,800.00 100.00% 0.00 0.00 0.00%
02 MEJORAMIENTO Y REABILITACION EN EL CANAL MATRIZ O PRINCIPAL - CACHI HUANTA 2,676,185.48
02.01 OBRAS DE MEJORAMIENTO DE LA BOCATOMA EXISTENTE CACHI HUANTA 198,854.07
02.01.01 MEJORAMIENTO DE LA BOCATOMA EXISTENTE CACHI HUANTA 108,505.43
02.01.01.01 LIMPIEZA Y DESBROSE MANUAL m2 3,000.00 0.61 1,830.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,000.00 1,830.00 100.00%
02.01.01.02 DESVIO PROVISIONAL DEL RIO - CON MAQUINARIA m3 36.60 22.50 823.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 36.60 823.50 100.00%
02.01.01.03 DESCOLMATACION Y ACOMODO DE MATERIAL AGUAS ARRIBA D m3 456.00 22.50 10,260.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 456.00 10,260.00 100.00%
02.01.01.04 DESCOLMATACION Y ACOMODO MANUAL DE MATERIAL EN EL C m3 127.70 32.30 4,124.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 127.70 4,124.71 100.00%
02.01.01.05 DEMOLICION DEL DADO DE CONCRETO (0.25X0.45M.) m3 0.04 40.38 1.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.04 1.62 100.00%
02.01.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 0.63 33.99 21.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.63 21.41 100.00%
02.01.01.07 ACERO FY=4200 KG/CM2, GRADO 60 kg 5.99 6.24 37.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.99 37.38 100.00%
02.01.01.08 CONCRETO f´c=210Kg/cm2 m3 0.04 419.89 16.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.04 16.80 100.00%
02.01.01.09 DESMONTAJE DE COMPUERTA METALICA (6.30X1.80m.), e=3/8" und 2.00 1,606.53 3,213.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 3,213.06 100.00%
02.01.01.10 DESMONTAJE DE COMPUERTA METALICA (1.50x1.05m.), e=3/8" und 1.00 493.66 493.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 493.66 100.00%
02.01.01.11 DESMONTAJE DE COMPUERTA METALICA (2.0x1.00m.), e=3/8" und 2.00 763.27 1,526.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,526.54 100.00%
02.01.01.12 SUMINISTRO E INSTALACION DE COMPUERTA METALICA (6.30X1.80m.), und 2.00 32,004.13 64,008.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 64,008.26 100.00%
02.01.01.13 SUMINISTRO E INSTALACION DE COMPUERTA METALICA (1.50x1.05m.), und 1.00 6,000.63 6,000.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 6,000.63 100.00%
02.01.01.14 SUMINISTRO E INSTALACION DE COMPUERTA METALICA (2.0x1.00m.), und 2.00 5,844.11 11,688.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 11,688.22 100.00%
02.01.01.15 DESMONTAJE DE REJILLA METALICA 2.00X0.96m., e=3/8" - espaciado 0 und 4.00 205.45 821.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 821.80 100.00%
02.01.01.16 SUMINISTRO E INSTALACION DE REJILLA METALICA 2.00X0.96, e=3/8" und 4.00 762.56 3,050.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 3,050.24 100.00%
02.01.01.17 PINTURA EPOXICA EN BARANDAS m 52.00 11.30 587.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 52.00 587.60 100.00%
02.01.02 MEJORAMIENTO Y EQUIPAMIENTO DE LA CASETA DE VIGILANCIA EXISTENTE 12,050.72
02.01.02.01 TARRAJEO EN EXTERIORES E INTERIORES - CASETA DE CONTROL m2 96.72 15.10 1,460.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 96.72 1,460.47 100.00%
02.01.02.02 TARRAJEO CIELORASO - CASETA DE CONTROL m2 26.67 25.30 674.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.67 674.75 100.00%
02.01.02.03 PISO DE CEMENTO PULIDO Y BRUÑADO, S/COLOREAR e=2" m2 26.67 26.63 710.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.67 710.22 100.00%
02.01.02.04 PINTURA LATEX 02 MANOS EN MUROS Y CIELORASO m2 123.39 7.46 920.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 123.39 920.49 100.00%
02.01.02.05 SUMINISTRO E INST. DE VENTANAS 1.25x1.25 (Incluye vidrio) und 2.00 261.79 523.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 523.58 100.00%
02.01.02.06 SUMINISTRO E INST. DE VENTANAS 2.45x1.25 (Incluye vidrio) und 1.00 451.79 451.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 451.79 100.00%
02.01.02.07 SUMINISTRO E INST. DE VENTANAS 1.50x1.25 (Incluye vidrio) und 1.00 303.79 303.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 303.79 100.00%
02.01.02.08 MANTENIMIENTO DE LA PUERTA METALICA EXISTENTE (1.20X2.20 und 1.00 196.97 196.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 196.97 100.00%
02.01.02.09 KIT DE HERRAMIENTAS Y MATERIALES PARA LA OPERACION DE jgo 1.00 5,544.00 5,544.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 5,544.00 100.00%
02.01.02.10 INSTALACION DE BAÑO DE HOYO SECO und 1.00 1,264.66 1,264.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,264.66 100.00%
02.01.03 ELECTRIFICACION EN LA BOCATOMA Y CASETA DE VIGILANCIA EXISTENTE 78,297.92
02.01.03.01 INSTALACION DE RED SECUNDARIO DE 10KVA 60,645.50
02.01.03.01.01 LIMPIEZA DE LINEA m 819.11 0.72 589.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 819.11 589.76 100.00%
02.01.03.01.02 TRAZO Y REPLANTEO DE POSTES und 9.00 105.12 946.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.00 946.08 100.00%
02.01.03.01.03 TRASLADO DE POSTES und 9.00 343.99 3,095.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.00 3,095.91 100.00%
02.01.03.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 5.73 20.19 115.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.73 115.69 100.00%
02.01.03.01.05 POSTES DE C.A.C. 12/300/165/345 und 7.00 953.49 6,674.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.00 6,674.43 100.00%
02.01.03.01.06 POSTES DE C.A.C. 13/500/210/405 und 2.00 1,003.49 2,006.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 2,006.98 100.00%
02.01.03.01.07 RETENIDA INCLINADA SIMPLE AISLADA R1 und 6.00 988.97 5,933.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 5,933.82 100.00%
02.01.03.01.08 PUESTA A TIERRA PAT-SED und 2.00 1,525.77 3,051.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 3,051.54 100.00%
02.01.03.01.09 PUESTA A TIERRA PAT-1 und 3.00 1,043.27 3,129.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 3,129.81 100.00%
02.01.03.01.10 PUESTA A TIERRA PAT-2 und 4.00 864.02 3,456.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 3,456.08 100.00%
02.01.03.01.11 ARMADO TIPO SOPORTE EN ALINIAMIENTO 0-5° PS1-0 und 4.00 1,079.96 4,319.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 4,319.84 100.00%
02.01.03.01.12 ARMADO TIPO SOPORTE DE ANGULO 60-90° PA3-0 und 4.00 1,195.17 4,780.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 4,780.68 100.00%
02.01.03.01.13 ARMADO TIPO SUBESTACION CON VANO FLOJO SAM und 1.00 14,509.77 14,509.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 14,509.77 100.00%
02.01.03.01.14 CABLE AAAC 1 X 35 mm2 m 819.11 7.84 6,421.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 819.11 6,421.82 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
02.01.03.01.15 PRUEBA Y PUESTA EN SERVICIO DE LAS LINEAS Y REDES KM 0.82 891.57 731.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.82 731.09 100.00%
02.01.03.01.16 PRUEBA Y PUESTA EN SERVICIO DE LAS SUB ESTACIONES S.E. 1.00 882.20 882.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 882.20 100.00%
02.01.03.02 INSTALACIONES ELECTRICAS EN INTERIORES Y EXTERIORES DE BOCATOMA 17,652.42
02.01.03.02.01 SALIDA PARA CENTROS DE LUZ CASETA DE VIGILANCIA pto 4.00 83.38 333.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 333.52 100.00%
02.01.03.02.02 SALIDA PARA LUZ DE ALUMBRADO BOCATOMA pto 6.00 400.57 2,403.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 2,403.42 100.00%
02.01.03.02.03 SALIDA PARA INTERRUPTOR SIMPLE pto 2.00 49.27 98.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 98.54 100.00%
02.01.03.02.04 SALIDA PARA INTERRUPTOR DOBLE pto 1.00 59.27 59.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 59.27 100.00%
02.01.03.02.05 CABLE ELECTRICO NH-80 2 X 2.5 mm2 m 34.56 4.79 165.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 34.56 165.54 100.00%
02.01.03.02.06 CABLE ELECTRICO NH-80 2 X 4 mm2 m 42.04 10.56 443.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 42.04 443.94 100.00%
02.01.03.02.07 CABLE ELECTRICO NH-80 2 X 6 mm2 m 333.12 12.14 4,044.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 333.12 4,044.08 100.00%
02.01.03.02.08 TUBERIA PVC SEL 3/4" PARA TOMACORRIENTE m 17.28 4.58 79.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.28 79.14 100.00%
02.01.03.02.09 TUBERIA PVC SAP 3/4" PARA ILUMINACION m 21.02 4.58 96.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 21.02 96.27 100.00%
02.01.03.02.10 TUBERIA PVC SAP 3/4" PARA ALUMBRADO EXTERIOR m 51.64 7.00 361.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 51.64 361.48 100.00%
02.01.03.02.11 TUBERIA PVC SAP 3/4" PARA MOTOR ELECTRICO m 48.20 7.80 375.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 48.20 375.96 100.00%
02.01.03.02.12 SALIDA PARA TOMACORRIENTE DOBLE C/LINEA DE TIERRA pto 4.00 58.73 234.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 234.92 100.00%
02.01.03.02.13 TABLERO GENERAL Y INTERRUPTORES und 1.00 953.72 953.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 953.72 100.00%
02.01.03.02.14 TABLERO DESTRIBUCION, INTERRUPTORE Y CONTACTORES und 1.00 1,706.10 1,706.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,706.10 100.00%
02.01.03.02.15 POZO DE PUESTA TIERRA und 1.00 1,503.98 1,503.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,503.98 100.00%
02.01.03.02.16 POSTE DE TUBO CIRCULAR REDONDO DE 6" X 3.5m und 3.00 567.79 1,703.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 1,703.37 100.00%
02.01.03.02.17 INSTALACION DE MOTOR MONOFASICO DE INVERSION DE GI und 1.00 3,089.17 3,089.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,089.17 100.00%
02.02 MEJORAMIENTO DEL DESARENADOR EXISTENTE 29,914.12
02.02.01 DESCOLMATACION Y LIMPIEZA DENTRO DEL DESARENADOR m3 14.08 12.11 170.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.08 170.51 100.00%
02.02.02 DESMONTAJE DE COMPUERTA METALICA TIPO IZAJE (1.85x1.40m.), e= und 2.00 670.66 1,341.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,341.32 100.00%
02.02.03 DESMONTAJE DE COMPUERTA METALICA TIPO IZAJE (0.80x0.70m.), e= und 1.00 411.34 411.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 411.34 100.00%
02.02.04 DESMONTAJE DE COMPUERTA METALICA TIPO IZAJE (0.70x0.75m.), e= und 2.00 411.34 822.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 822.68 100.00%
02.02.05 DESMONTAJE DE REJILLA METALICA - DESARENADOR und 1.00 394.67 394.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 394.67 100.00%
02.02.06 SUMINISTRO E INSTALACION DE COMPUERTA METALICA (1.85x1.40m.), Hvund 2.00 7,843.31 15,686.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 15,686.62 100.00%
02.02.07 SUMINISTRO E INSTALACION DE COMPUERTA METALICA (0.80x0.70m.), H und 1.00 3,068.14 3,068.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,068.14 100.00%
02.02.08 SUMINISTRO E INSTALACION DE COMPUERTA METALICA (0.70x0.75m.), Hvund 2.00 2,953.14 5,906.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 5,906.28 100.00%
02.02.09 SUMINISTRO E INSTALACION DE REJILLA DE PLATINA 1/4"X1"- Esp und 1.00 2,112.56 2,112.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 2,112.56 100.00%
02.03 MEJORAMIENTO DEL CANAL PRINCIPAL CACHI HUANTA (42.645 km) 1,415,053.95
02.03.01 LIMPIEZA Y DESBROSE MANUAL m2 16,290.00 0.61 9,936.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16,290.00 9,936.90 100.00%
02.03.02 DESCOLMATACION Y ACOMODO MANUAL DEL MATERIAL DE LA PLA m3 3,588.16 12.11 43,452.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,588.16 43,452.62 100.00%
02.03.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJEC mes 3.00 8,069.46 24,208.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 24,208.38 100.00%
02.03.04 EXCAVACION EN METERIAL SUELTO m3 5,314.68 20.19 107,303.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5,314.68 107,303.39 100.00%
02.03.05 DEMOLICION DE CANAL DE CONCRETO CON MARTILLO DEMOLEDO m3 1,146.20 40.07 45,928.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,146.20 45,928.23 100.00%
02.03.06 RELLENO, NIVELACION Y COMPACTACION CON MATERIAL CLASIF m3 5,190.80 58.32 302,727.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5,190.80 302,727.46 100.00%
02.03.07 RELLENO CON MATERIAL PROPIO m3 114.80 15.71 1,803.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 114.80 1,803.51 100.00%
02.03.08 ELIMINACION DE MATERIAL PRODUCTO DE LA DEMOLICION CON EQUI m3 1,215.04 28.40 34,507.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,215.04 34,507.14 100.00%
02.03.09 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 520.73 13.46 7,009.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 520.73 7,009.03 100.00%
02.03.10 ENCOFRADO Y DESENCOFRADO NORMAL m2 498.50 33.99 16,944.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 498.50 16,944.02 100.00%
02.03.11 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 443.12 31.32 13,878.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 443.12 13,878.52 100.00%
02.03.12 CONCRETO f´c=175Kg/cm2 m3 1,346.94 395.69 532,970.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,346.94 532,970.69 100.00%
02.03.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETANO m 5,967.07 36.46 217,559.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5,967.07 217,559.37 100.00%
02.03.14 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 88.82 72.87 6,472.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 88.82 6,472.31 100.00%
02.03.15 SELLADO DE GRIETAS Y FISURAS ep=2cm m 541.80 43.06 23,329.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 541.80 23,329.91 100.00%
02.03.16 SELLADO DE GRIETAS Y FISURAS A PRESION ep=2cm m 447.54 60.38 27,022.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 447.54 27,022.47 100.00%
02.04 MEJORAMIENTO DEL CANOAS EXISTENTES 18,369.35
02.04.01 LIMPIEZA Y DESBROSE MANUAL m2 1,090.00 0.61 664.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,090.00 664.90 100.00%
02.04.02 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 130.80 10.09 1,319.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 130.80 1,319.77 100.00%
02.04.03 EMBOQUILLADO DE PIEDRA CON CONCRETO FC=140KG/CM2+60%PM, m2 99.31 46.96 4,663.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 99.31 4,663.60 100.00%
02.04.04 PICADO, LIMPIEZA DE MUROS, BASE Y PAÑOS DEL CANAL e=2.5cm m2 6.89 17.14 118.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.89 118.09 100.00%
02.04.05 DEMOLICION MANUAL DE CONCRETO m3 2.13 40.38 86.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.13 86.01 100.00%
02.04.06 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 5.16 31.32 161.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.16 161.61 100.00%
02.04.07 COLOCACION DE ACERO FY=4200 KG/CM2, GRADO 60 EN ESTRUCTU kg 343.22 7.60 2,608.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 343.22 2,608.47 100.00%
02.04.08 ENCOFRADO Y DESENCOFRA CARAVISTA m2 61.01 48.48 2,957.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 61.01 2,957.76 100.00%
02.04.09 CONCRETO f´c=210Kg/cm2 m3 7.51 419.89 3,153.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.51 3,153.37 100.00%
02.04.10 CONCRETO f´c=175Kg/cm2 m3 5.00 395.69 1,978.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 1,978.45 100.00%
02.04.11 REPOSICION DE JUNTAS DE DILATACION CON SELLO ELASTOMÉRI m 12.90 31.90 411.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.90 411.51 100.00%
02.04.12 REPARACION Y RESANE EN CANOAS EXISTENTES e=8cm (C:A 1:4) m2 4.01 61.30 245.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.01 245.81 100.00%
02.05 MUROS DE PROTECCION DE LAS CANOAS EXISTENTES (H=5.0m L=5m., H=3.0m L=15m y H=2.5m. L=7.30m.) 70,177.52
02.05.01 LIMPIEZA Y DESBROSE MANUAL m2 51.91 0.61 31.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 51.91 31.67 100.00%
02.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 80.98 3.85 311.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 80.98 311.77 100.00%
02.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 256.31 20.19 5,174.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 256.31 5,174.90 100.00%
02.05.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 116.60 15.71 1,831.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 116.60 1,831.79 100.00%
02.05.05 EMBOQUILLADO DE PIEDRA CON CONCRETO FC=140KG/CM2+60%PM, m2 23.40 46.96 1,098.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23.40 1,098.86 100.00%
02.05.06 CONCRETO CICLOPEO F'C=140 KG/CM2+70%PG m3 27.90 172.00 4,798.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.90 4,798.80 100.00%
02.05.07 CONCRETO CICLOPEO F'C=140 KG/CM2+50%PG m3 20.44 235.87 4,821.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.44 4,821.18 100.00%
02.05.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 191.10 33.99 6,495.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 191.10 6,495.49 100.00%
02.05.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 2,626.09 6.24 16,386.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,626.09 16,386.80 100.00%
02.05.10 CONCRETO f´c=210Kg/cm2 m3 68.30 419.89 28,678.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 68.30 28,678.49 100.00%
02.05.11 COLOCACION DE FILTRO DE GRAVA 3/4" a 1 1/2" m3 3.02 52.02 157.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.02 157.10 100.00%
02.05.12 TUBERIA PVC SAP Ø=4", C-5 NTP ISO 399.002 m 27.30 11.03 301.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.30 301.12 100.00%
02.05.13 TUBERIA PVC SAP Ø=21/2", C-5 NTP ISO 399.002 m 3.70 8.13 30.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.70 30.08 100.00%
02.05.14 TUBERIA PVC SAP Ø=2", C-5 NTP ISO 399.002 m 8.40 7.08 59.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.40 59.47 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
02.06 MEJORAMIENTO DE POZAS DESIPADORAS DE ENERGIA (13 UND) 5,683.08
02.06.01 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 7.80 10.09 78.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.80 78.70 100.00%
02.06.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 8.00 3.85 30.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 30.80 100.00%
02.06.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 6.00 20.19 121.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 121.14 100.00%
02.06.04 REFINE, COMPACTACION Y NIVELACION m2 8.00 1.70 13.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 13.60 100.00%
02.06.05 DEMOLICION MANUAL DE CONCRETO m3 1.20 40.38 48.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.20 48.46 100.00%
02.06.06 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 1.11 31.32 34.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.11 34.77 100.00%
02.06.07 COLOCACION DE ACERO FY=4200 KG/CM2, GRADO 60 EN ESTRUCTU kg 51.09 7.60 388.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 51.09 388.28 100.00%
02.06.08 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 23.27 50.06 1,164.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23.27 1,164.90 100.00%
02.06.09 CONCRETO f´c=210Kg/cm2 m3 1.10 419.89 461.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.10 461.88 100.00%
02.06.10 CONCRETO f´c=175Kg/cm2 m3 2.10 395.69 830.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.10 830.95 100.00%
02.06.11 RESANE EN MUROS, BASE, PAÑOS DE CANAL y OBRAS DE ARTE EXISTE m2 6.54 72.87 476.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.54 476.57 100.00%
02.06.12 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETANO - C m 11.00 36.46 401.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.00 401.06 100.00%
02.06.13 SELLADO DE GRIETAS Y FISURAS ep=2cm m 37.90 43.06 1,631.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 37.90 1,631.97 100.00%
02.07 MEJORAMIENTO DEL ACUEDUCTO 35+438 (L=8.30m.) 814.18
02.07.01 PICADO DE MUROS, BASE Y PAÑOS DEL CANAL e=2.5cm m2 1.29 17.14 22.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.29 22.11 100.00%
02.07.02 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 1.29 31.32 40.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.29 40.40 100.00%
02.07.03 COLOCACION DE ACERO FY=4200 KG/CM2, GRADO 60 EN ESTRUCTU kg 15.90 7.60 120.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.90 120.84 100.00%
02.07.04 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 8.24 50.06 412.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.24 412.49 100.00%
02.07.05 CONCRETO f´c=210Kg/cm2 m3 0.52 419.89 218.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.52 218.34 100.00%
02.08 MEJORAMIENTO DESARENADOR EXISTENTE 34+948 Y CANAL DE LIMPIA 5,370.20
02.08.01 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 7.50 10.09 75.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.50 75.68 100.00%
02.08.02 PICADO DE MUROS, BASES, PAÑOS DEL CANAL Y OBRAS DE ARTE e= m2 1.25 17.14 21.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.25 21.43 100.00%
02.08.03 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 1.25 31.32 39.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.25 39.15 100.00%
02.08.04 COLOCACION DE ACERO FY=4200 KG/CM2, GRADO 60 EN ESTRUCTU kg 15.46 7.60 117.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.46 117.50 100.00%
02.08.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 8.00 50.06 400.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 400.48 100.00%
02.08.06 CONCRETO f´c=210Kg/cm2 m3 0.50 419.89 209.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.50 209.95 100.00%
02.08.07 SELLADO DE GRIETAS Y FISURAS ep=2cm m 17.50 43.06 753.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.50 753.55 100.00%
02.08.08 DESMONTAJE DE COMPUERTA METALICA TIPO IZAJE (0.70x0.90m.), Ht= und 1.00 411.34 411.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 411.34 100.00%
02.08.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA, IZAJE TIPO ARM und 1.00 3,341.12 3,341.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,341.12 100.00%
02.09 MEJORAMIENTO BOCATOMA DE FONDO 37+940 5,392.25
02.09.01 LIMPIEZA Y DESBROSE MANUAL m2 137.25 0.61 83.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 137.25 83.72 100.00%
02.09.02 DESMONTAJE DE COMPUERTA METALICA TIPO IZAJE EN BOCATOM und 2.00 411.34 822.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 822.68 100.00%
02.09.03 DESMONTAJE DE REJILLA METALICA 1.40X5.00m., e=1/4" - espaciado 5C und 1.00 205.45 205.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 205.45 100.00%
02.09.04 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO (0.8und 1.00 1,658.92 1,658.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,658.92 100.00%
02.09.05 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO (0.6und 1.00 1,658.92 1,658.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,658.92 100.00%
02.09.06 SUMINISTRO E INST. DE REJILLA DE PLATINA 1/4"X1"- Espaciado 5Cm. ( und 1.00 962.56 962.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 962.56 100.00%
02.10 MEJORAMIENTO DE TOMAS LATERALES (27 UND) 29,888.43
02.10.01 DESMONTAJE DE COMPUERTA METALICA TIPO IZAJE EN TOMAS L und 27.00 185.55 5,009.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.00 5,009.85 100.00%
02.10.02 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO ( und 17.00 992.56 16,873.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.00 16,873.52 100.00%
02.10.03 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO ( und 3.00 872.56 2,617.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 2,617.68 100.00%
02.10.04 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO ( und 3.00 813.29 2,439.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 2,439.87 100.00%
02.10.05 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO ( und 1.00 1,761.34 1,761.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,761.34 100.00%
02.10.06 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO ( und 3.00 395.39 1,186.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 1,186.17 100.00%
02.11 CANOAS L=Variable (18 UND) 118,779.38
02.11.01 LIMPIEZA Y DESBROSE MANUAL m2 335.60 0.61 204.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 335.60 204.72 100.00%
02.11.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 453.35 3.85 1,745.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 453.35 1,745.40 100.00%
02.11.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 225.82 20.19 4,559.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 225.82 4,559.31 100.00%
02.11.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 282.28 12.11 3,418.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 282.28 3,418.41 100.00%
02.11.05 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 86.26 297.98 25,703.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 86.26 25,703.75 100.00%
02.11.06 ENCOFRADO Y DESENCOFRA CARAVISTA m2 237.49 48.48 11,513.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 237.49 11,513.52 100.00%
02.11.07 ACERO FY=4200 KG/CM2, GRADO 60 kg 3,389.36 6.24 21,149.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,389.36 21,149.61 100.00%
02.11.08 CONCRETO f´c=210Kg/cm2 m3 48.88 419.89 20,524.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 48.88 20,524.22 100.00%
02.11.09 EMBOQUILLADO DE PIEDRA CON CONCRETO FC=140KG/CM2+60%PM, m2 216.80 46.96 10,180.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 216.80 10,180.93 100.00%
02.11.10 CONCRETO CICLOPEO F'C=175 KG/CM2+30%PM m3 54.72 310.30 16,979.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 54.72 16,979.62 100.00%
02.11.11 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETANO O m 109.20 25.64 2,799.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 109.20 2,799.89 100.00%
02.12 PASES VEHICULARES (05 UND) 58,524.52
02.12.01 LIMPIEZA Y DESBROSE MANUAL m2 72.00 0.61 43.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 72.00 43.92 100.00%
02.12.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 72.00 3.85 277.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 72.00 277.20 100.00%
02.12.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 126.00 20.19 2,543.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 126.00 2,543.94 100.00%
02.12.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 102.00 15.71 1,602.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 102.00 1,602.42 100.00%
02.12.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 282.28 12.11 3,418.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 282.28 3,418.41 100.00%
02.12.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 69.20 297.98 20,620.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 69.20 20,620.22 100.00%
02.12.07 ENCOFRADO Y DESENCOFRA CARAVISTA m2 76.00 48.48 3,684.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 76.00 3,684.48 100.00%
02.12.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 2,023.16 6.24 12,624.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,023.16 12,624.52 100.00%
02.12.09 CONCRETO f´c=210Kg/cm2 m3 19.00 419.89 7,977.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 19.00 7,977.91 100.00%
02.12.10 BARANDA METALICA CON TUBO DE F°GALV. DE 2" m 102.00 51.04 5,206.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 102.00 5,206.08 100.00%
02.12.11 PINTURA EPOXICA ANTICORROSIVA m2 15.50 29.73 460.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.50 460.82 100.00%
02.12.12 JUNTAS DE DILATACION CON TECNOPORT E=1" m 20.00 3.23 64.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.00 64.60 100.00%
02.13 PASE PEATONAL (17 UND) 72,145.47
02.13.01 LIMPIEZA Y DESBROSE MANUAL m2 34.00 0.61 20.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 34.00 20.74 100.00%
02.13.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 34.00 3.85 130.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 34.00 130.90 100.00%
02.13.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 107.08 20.19 2,161.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 107.08 2,161.95 100.00%
02.13.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 8.50 15.71 133.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.50 133.54 100.00%
02.13.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 123.22 12.11 1,492.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 123.22 1,492.19 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
02.13.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 71.15 297.98 21,201.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 71.15 21,201.28 100.00%
02.13.07 ENCOFRADO Y DESENCOFRA CARAVISTA m2 129.20 48.48 6,263.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 129.20 6,263.62 100.00%
02.13.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 1,635.18 6.24 10,203.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,635.18 10,203.52 100.00%
02.13.09 CONCRETO f´c=210Kg/cm2 m3 27.20 419.89 11,421.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.20 11,421.01 100.00%
02.13.10 BARANDA METALICA CON TUBO DE F°GALV. DE 2" m 344.08 51.04 17,561.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 344.08 17,561.84 100.00%
02.13.11 PINTURA EPOXICA ANTICORROSIVA m2 52.30 29.73 1,554.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 52.30 1,554.88 100.00%
02.14 TAPAS DE CANAL (L=75m. A=3.10m.; L=72m. A=3.30; L=50m. A=1.45m. y L=184m., A=1.30m.) 72,896.45
02.14.01 LIMPIEZA Y DESBROSE MANUAL m2 228.60 0.61 139.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 228.60 139.45 100.00%
02.14.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 228.60 3.85 880.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 228.60 880.11 100.00%
02.14.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 76.20 20.19 1,538.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 76.20 1,538.48 100.00%
02.14.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 95.25 12.11 1,153.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 95.25 1,153.48 100.00%
02.14.05 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 76.20 297.98 22,706.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 76.20 22,706.08 100.00%
02.14.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 593.34 33.99 20,167.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 593.34 20,167.63 100.00%
02.14.07 ACERO FY=4200 KG/CM2, GRADO 60 kg 237.68 6.24 1,483.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 237.68 1,483.12 100.00%
02.14.08 CONCRETO f´c=210Kg/cm2 m3 59.13 419.89 24,828.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 59.13 24,828.10 100.00%
02.15 MURO DE CONCRETO CICLOPEO (L=5.00m.) 5,159.13
02.15.01 LIMPIEZA Y DESBROSE MANUAL m2 12.00 0.61 7.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 7.32 100.00%
02.15.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 12.00 3.85 46.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 46.20 100.00%
02.15.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 25.90 20.19 522.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 25.90 522.92 100.00%
02.15.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 14.35 15.71 225.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.35 225.44 100.00%
02.15.05 CONCRETO CICLOPEO F'C=140 KG/CM2+50%PG m3 14.00 235.87 3,302.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.00 3,302.18 100.00%
02.15.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 28.00 33.99 951.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 28.00 951.72 100.00%
02.15.07 COLOCACION DE FILTRO DE GRAVA 3/4" a 1 1/2" m3 0.60 52.02 31.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.60 31.21 100.00%
02.15.08 TUBERIA PVC SAP Ø=4", C-5 NTP ISO 399.002 m 5.00 11.03 55.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 55.15 100.00%
02.15.09 TUBERIA PVC SAP Ø=2", C-5 NTP ISO 399.002 m 2.40 7.08 16.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.40 16.99 100.00%
02.16 MUROS DE CONCRETO ARMADO (H=3.0m L=35m., H=3.5m L=10m, H=4.5m. L=7m., H=5m. L=40m., H=5.5m. L=3m. 399,116.64
02.16.01 LIMPIEZA Y DESBROSE MANUAL m2 377.30 0.61 230.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 377.30 230.15 100.00%
02.16.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 377.30 3.85 1,452.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 377.30 1,452.61 100.00%
02.16.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1,321.40 20.19 26,679.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,321.40 26,679.07 100.00%
02.16.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 725.90 15.71 11,403.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 725.90 11,403.89 100.00%
02.16.05 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 14.55 19.98 290.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.55 290.71 100.00%
02.16.06 CONCRETO CICLOPEO F'C=140 KG/CM2+70%PG m3 139.20 172.00 23,942.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 139.20 23,942.40 100.00%
02.16.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 807.13 33.99 27,434.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 807.13 27,434.35 100.00%
02.16.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 17,456.62 6.24 108,929.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17,456.62 108,929.31 100.00%
02.16.09 CONCRETO f´c=210Kg/cm2 m3 468.15 419.89 196,571.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 468.15 196,571.50 100.00%
02.16.10 COLOCACION DE FILTRO DE GRAVA 3/4" a 1 1/2" m3 10.26 52.02 533.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.26 533.73 100.00%
02.16.11 TUBERIA PVC SAP Ø=4", C-5 NTP ISO 399.002 m 95.00 11.03 1,047.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 95.00 1,047.85 100.00%
02.16.12 TUBERIA PVC SAP Ø=21/2", C-5 NTP ISO 399.002 m 46.50 8.13 378.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 46.50 378.05 100.00%
02.16.13 TUBERIA PVC SAP Ø=2", C-5 NTP ISO 399.002 m 31.50 7.08 223.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 31.50 223.02 100.00%
02.17 TOMAS PREDIALES Bc=0.25XHc1=0.25m. y Hc=Variable (95 UND) 60,946.38
02.17.01 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 52.25 3.85 201.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 52.25 201.16 100.00%
02.17.02 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 93.79 20.19 1,893.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 93.79 1,893.62 100.00%
02.17.03 DEMOLICION MANUAL DE CONCRETO m3 4.87 40.38 196.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.87 196.65 100.00%
02.17.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 41.10 15.71 645.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 41.10 645.68 100.00%
02.17.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 57.38 12.11 694.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 57.38 694.87 100.00%
02.17.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 181.13 33.99 6,156.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 181.13 6,156.61 100.00%
02.17.07 ACERO FY=4200 KG/CM2, GRADO 60 kg 204.46 6.24 1,275.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 204.46 1,275.83 100.00%
02.17.08 CONCRETO f´c=210Kg/cm2 m3 22.99 419.89 9,653.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 22.99 9,653.27 100.00%
02.17.09 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 112.81 24.03 2,710.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 112.81 2,710.82 100.00%
02.17.10 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE ((Bc=0.25xH und 32.00 445.39 14,252.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 32.00 14,252.48 100.00%
02.17.11 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE (Bc=0.25xHc und 11.00 425.39 4,679.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.00 4,679.29 100.00%
02.17.12 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE (Bc=0.25xHc und 6.00 425.39 2,552.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 2,552.34 100.00%
02.17.13 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE (Bc=0.25xH und 2.00 348.56 697.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 697.12 100.00%
02.17.14 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE (Bc=0.25xH und 28.00 348.56 9,759.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 28.00 9,759.68 100.00%
02.17.15 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE (Bc=0.25xHc und 2.00 348.56 697.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 697.12 100.00%
02.17.16 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE (Bc=0.25xHc und 14.00 348.56 4,879.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.00 4,879.84 100.00%
02.18 ACUEDUCTO O PUENTE CANAL L=4.00m. (01 UND) 2,134.10
02.18.01 LIMPIEZA Y DESBROSE MANUAL m2 5.10 0.61 3.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.10 3.11 100.00%
02.18.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 5.00 3.85 19.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 19.25 100.00%
02.18.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.62 20.19 52.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.62 52.90 100.00%
02.18.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 1.96 15.71 30.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.96 30.79 100.00%
02.18.05 CONCRETO CICLOPEO F'C=140 KG/CM2+50%PG m3 1.42 235.87 334.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.42 334.94 100.00%
02.18.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 13.61 33.99 462.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.61 462.60 100.00%
02.18.07 ACERO FY=4200 KG/CM2, GRADO 60 kg 87.90 6.24 548.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 87.90 548.50 100.00%
02.18.08 CONCRETO f´c=210Kg/cm2 m3 0.92 419.89 386.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.92 386.30 100.00%
02.18.09 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 4.80 24.03 115.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.80 115.34 100.00%
02.18.10 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 6.84 13.52 92.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.84 92.48 100.00%
02.18.11 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETANO m 1.30 36.46 47.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.30 47.40 100.00%
02.18.12 PINTURA LATEX 02 MANOS EN MUROS EXTERIORES m2 6.84 5.92 40.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.84 40.49 100.00%
02.19 ESPIGONES L=Variable - PROTECCION CANAL (04 UND) 106,966.26
02.19.01 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 5.00 3.85 19.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 19.25 100.00%
02.19.02 EXCAVACION CON MAQUINARIA m3 142.68 21.27 3,034.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 142.68 3,034.80 100.00%
02.19.03 ENRROCADO Y ACOMODADO CON MAQUINARIA Dmedio de 1.00@2.00m m3 791.48 67.88 53,725.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 791.48 53,725.66 100.00%
02.19.04 CONCRETO CICLOPEO F'C=140 KG/CM2+70%PG - ESPIGON m3 364.94 137.52 50,186.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 364.94 50,186.55 100.00%
03 MEJORAMIENTO Y AMPLIACION DE CANALES LATERALES (22 CANALES LATERALES) 1,071,044.40
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 01 - CANGARI 37,438.63
03.01.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 22,296.04
03.01.01.01 LIMPIEZA Y DESBROSE MANUAL m2 2,436.00 0.61 1,485.96 2,436.00 1,485.96 100.00% 0.00 0.00 0.00% 2,436.00 1,485.96 100.00% 0.00 0.00 0.00%
03.01.01.02 DEMOLICION MANUAL DE CONCRETO m3 21.49 40.38 867.77 0.85 34.32 3.96% 0.00 0.00 0.00% 0.85 34.32 3.96% 20.64 833.44 96.04%
03.01.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.13 8,069.46 1,049.03 0.08 645.56 61.54% 0.00 0.00 0.00% 0.08 645.56 61.54% 0.05 403.47 38.46%
03.01.01.04 EXCAVACION MANUAL EN MATERIAL CONGLOMERADO m3 30.77 20.19 621.25 9.96 201.09 32.37% 0.00 0.00 0.00% 9.96 201.09 32.37% 20.81 420.15 67.63%
03.01.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 32.24 13.46 433.95 1.14 15.34 3.54% 0.00 0.00 0.00% 1.14 15.34 3.54% 31.10 418.61 96.46%
03.01.01.06 REFINE, COMPACTACION Y NIVELACION m2 345.04 1.70 586.57 26.40 44.88 7.65% 0.00 0.00 0.00% 26.40 44.88 7.65% 318.64 541.69 92.35%
03.01.01.07 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 21.12 31.32 661.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 21.12 661.48 100.00%
03.01.01.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 13.57 33.99 461.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 461.24 100.00%
03.01.01.09 CONCRETO f´c=175Kg/cm2 m3 26.62 395.69 10,533.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.62 10,533.27 100.00%
03.01.01.10 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 153.47 36.46 5,595.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 153.47 5,595.52 100.00%
03.01.02 TOMA LATERAL TIPO I - CANGARI (14 UND) 9,082.24
03.01.02.01 LIMPIEZA Y DESBROSE MANUAL m2 42.00 0.61 25.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 42.00 25.62 100.00%
03.01.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 26.60 3.85 102.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.60 102.41 100.00%
03.01.02.03 DEMOLICION MANUAL DE CONCRETO m3 1.12 40.38 45.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.12 45.23 100.00%
03.01.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 3.58 20.19 72.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.58 72.28 100.00%
03.01.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 4.60 13.46 61.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.60 61.92 100.00%
03.01.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 46.26 50.06 2,315.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 46.26 2,315.78 100.00%
03.01.02.07 CONCRETO f´c=175Kg/cm2 m3 3.64 395.69 1,440.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.64 1,440.31 100.00%
03.01.02.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 35.84 36.46 1,306.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 35.84 1,306.73 100.00%
03.01.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 14.00 265.14 3,711.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.00 3,711.96 100.00%
03.01.03 TOMA LATERAL TIPO II - CANGARI (01 UND) 1,167.65
03.01.03.01 LIMPIEZA Y DESBROSE MANUAL m2 4.00 0.61 2.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 2.44 100.00%
03.01.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 3.85 5.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.50 5.78 100.00%
03.01.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 40.38 3.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.09 3.63 100.00%
03.01.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.51 20.19 10.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.51 10.30 100.00%
03.01.03.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 0.65 13.46 8.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.65 8.75 100.00%
03.01.03.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 6.14 50.06 307.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.14 307.37 100.00%
03.01.03.07 CONCRETO f´c=175Kg/cm2 m3 0.52 395.69 205.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.52 205.76 100.00%
03.01.03.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.56 36.46 93.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.56 93.34 100.00%
03.01.03.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 2.00 265.14 530.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 530.28 100.00%
03.01.04 MEJORAMIENTO DE TOMAS LATERALES EXISTENTE - CANGARI (03 UND) 873.01
03.01.04.01 LIMPIEZA Y DESBROSE MANUAL m2 6.00 0.61 3.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 3.66 100.00%
03.01.04.02 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 0.05 72.87 3.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.05 3.64 100.00%
03.01.04.03 DESMONTAJE DE COMPUERTA METALICA (0.25X0.65m.), e=3/16" und 3.00 23.43 70.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 70.29 100.00%
03.01.04.04 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 3.00 265.14 795.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 795.42 100.00%
03.01.05 AFORADOR PARSHALL - CANGARI (01 UND) 1,953.75
03.01.05.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.01.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.01.05.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.01.05.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.01.05.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.01.05.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.01.05.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.01.05.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.01.05.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.01.05.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.01.05.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.01.05.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.01.05.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.01.05.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.01.05.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.01.06 PASES PEATONALES - CANGARI (02 UND) 2,065.94
03.01.06.01 LIMPIEZA Y DESBROSE MANUAL m2 11.44 0.61 6.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.44 6.98 100.00%
03.01.06.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 8.80 3.85 33.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.80 33.88 100.00%
03.01.06.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.51 20.19 50.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.51 50.68 100.00%
03.01.06.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 0.40 15.71 6.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.40 6.28 100.00%
03.01.06.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 2.64 12.11 31.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.64 31.97 100.00%
03.01.06.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 1.06 297.98 315.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.06 315.86 100.00%
03.01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.00 33.99 475.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.00 475.86 100.00%
03.01.06.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 62.43 6.24 389.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 62.43 389.56 100.00%
03.01.06.09 CONCRETO f´c=210Kg/cm2 m3 1.52 419.89 638.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.52 638.23 100.00%
03.01.06.10 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 6.00 13.52 81.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 81.12 100.00%
03.01.06.11 PINTURA LATEX 02 MANOS EN MUROS EXTERIORES m2 6.00 5.92 35.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 35.52 100.00%
03.02 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 02 - CANGARI 87,856.28
03.02.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 68,857.85
03.02.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,330.05 0.61 811.33 1,330.05 811.33 100.00% 0.00 0.00 0.00% 1,330.05 811.33 100.00% 0.00 0.00 0.00%
03.02.01.02 DEMOLICION MANUAL DE CONCRETO m3 22.29 40.38 900.07 22.29 900.07 100.00% 0.00 0.00 0.00% 22.29 900.07 100.00% 0.00 0.00 0.00%
03.02.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.50 8,069.46 4,034.73 0.50 4,034.73 100.00% 0.00 0.00 0.00% 0.50 4,034.73 100.00% 0.00 0.00 0.00%
03.02.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 659.96 20.19 13,324.59 615.12 12,419.27 93.21% 0.00 0.00 0.00% 615.12 12,419.27 93.21% 44.84 905.32 6.79%
03.02.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 33.43 13.46 449.97 33.43 449.97 100.00% 0.00 0.00 0.00% 33.43 449.97 100.00% 0.00 0.00 0.00%
03.02.01.06 REFINE, COMPACTACION Y NIVELACION m2 980.54 1.70 1,666.92 378.32 643.14 38.58% 0.00 0.00 0.00% 378.32 643.14 38.58% 602.22 1,023.77 61.42%
03.02.01.07 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 2.40 31.32 75.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.40 75.17 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.02.01.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 37.23 33.99 1,265.45 37.23 1,265.45 100.00% 0.00 0.00 0.00% 37.23 1,265.45 100.00% 0.00 0.00 0.00%
03.02.01.09 CONCRETO f´c=175Kg/cm2 m3 73.21 395.69 28,968.46 47.11 18,640.96 64.35% 0.00 0.00 0.00% 47.11 18,640.96 64.35% 26.10 10,327.51 35.65%
03.02.01.10 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 476.17 36.46 17,361.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 476.17 17,361.16 100.00%
03.02.02 TOMA LATERAL TIPO I - CANGARI (18 UND) 11,644.60
03.02.02.01 LIMPIEZA Y DESBROSE MANUAL m2 54.00 0.61 32.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 54.00 32.94 100.00%
03.02.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 34.20 3.85 131.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 34.20 131.67 100.00%
03.02.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.66 40.38 26.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.66 26.65 100.00%
03.02.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 4.60 20.19 92.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.60 92.87 100.00%
03.02.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 5.83 13.46 78.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.83 78.47 100.00%
03.02.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 59.48 50.06 2,977.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 59.48 2,977.57 100.00%
03.02.02.07 CONCRETO f´c=175Kg/cm2 m3 4.68 395.69 1,851.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.68 1,851.83 100.00%
03.02.02.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 46.08 36.46 1,680.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 46.08 1,680.08 100.00%
03.02.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 18.00 265.14 4,772.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.00 4,772.52 100.00%
03.02.03 TOMA LATERAL TIPO II - CANGARI (01 UND) 1,167.65
03.02.03.01 LIMPIEZA Y DESBROSE MANUAL m2 4.00 0.61 2.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 2.44 100.00%
03.02.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 3.85 5.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.50 5.78 100.00%
03.02.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 40.38 3.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.09 3.63 100.00%
03.02.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.51 20.19 10.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.51 10.30 100.00%
03.02.03.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 0.65 13.46 8.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.65 8.75 100.00%
03.02.03.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 6.14 50.06 307.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.14 307.37 100.00%
03.02.03.07 CONCRETO f´c=175Kg/cm2 m3 0.52 395.69 205.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.52 205.76 100.00%
03.02.03.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.56 36.46 93.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.56 93.34 100.00%
03.02.03.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 2.00 265.14 530.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 530.28 100.00%
03.02.04 AFORADOR PARSHALL - CANGARI (01 UND) 1,953.75
03.02.04.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.02.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.02.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.02.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.02.04.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.02.04.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.02.04.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.02.04.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.02.04.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.02.04.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.02.04.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.02.04.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.02.04.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.02.04.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.02.04.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.02.05 PASES PEATONALES - CANGARI (01 UND) 1,032.85
03.02.05.01 LIMPIEZA Y DESBROSE MANUAL m2 5.72 0.61 3.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.72 3.49 100.00%
03.02.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 4.40 3.85 16.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.40 16.94 100.00%
03.02.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.25 20.19 25.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.25 25.24 100.00%
03.02.05.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 0.20 15.71 3.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.20 3.14 100.00%
03.02.05.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 1.32 12.11 15.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.32 15.99 100.00%
03.02.05.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 0.53 297.98 157.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.53 157.93 100.00%
03.02.05.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 7.00 33.99 237.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.00 237.93 100.00%
03.02.05.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 31.21 6.24 194.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 31.21 194.75 100.00%
03.02.05.09 CONCRETO f´c=210Kg/cm2 m3 0.76 419.89 319.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.76 319.12 100.00%
03.02.05.10 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 3.00 13.52 40.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 40.56 100.00%
03.02.05.11 PINTURA LATEX 02 MANOS EN MUROS EXTERIORES m2 3.00 5.92 17.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 17.76 100.00%
03.02.06 TAPA DE CONCRETO EN CANAL ABIERTO - CANGARI (5 MT) 365.93
03.02.06.01 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.10 20.19 2.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.10 2.02 100.00%
03.02.06.02 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 0.10 297.98 29.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.10 29.80 100.00%
03.02.06.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 1.28 33.99 43.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.28 43.51 100.00%
03.02.06.04 ACERO FY=4200 KG/CM2, GRADO 60 kg 18.31 6.24 114.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.31 114.25 100.00%
03.02.06.05 CONCRETO f´c=210Kg/cm2 m3 0.42 419.89 176.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.42 176.35 100.00%
03.02.07 POZA DESIPADORA DE ENERGIA - CANGARI (02 UND) 2,833.65
03.02.07.01 LIMPIEZA Y DESBROSE MANUAL m2 11.55 0.61 7.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.55 7.05 100.00%
03.02.07.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 4.88 3.85 18.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.88 18.79 100.00%
03.02.07.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 5.46 20.19 110.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.46 110.24 100.00%
03.02.07.04 REFINE, COMPACTACION Y NIVELACION m2 21.15 1.70 35.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 21.15 35.96 100.00%
03.02.07.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 6.83 13.46 91.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.83 91.93 100.00%
03.02.07.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 4.88 19.98 97.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.88 97.50 100.00%
03.02.07.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.02.07.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 86.51 6.24 539.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 86.51 539.82 100.00%
03.02.07.09 CONCRETO f´c=210Kg/cm2 m3 2.15 419.89 902.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.15 902.76 100.00%
03.02.07.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 14.78 24.03 355.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.78 355.16 100.00%
03.02.07.11 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 5.40 36.46 196.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.40 196.88 100.00%
03.03 CANAL LATERAL 03 - CHIWA 108,196.00
03.03.01 CONSTRUCCION DEL CANAL LATERAL 03 - CHIWA 903.54 m. 81,418.13
03.03.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,490.84 0.61 909.41 1,490.84 909.41 100.00% 0.00 0.00 0.00% 1,490.84 909.41 100.00% 0.00 0.00 0.00%
03.03.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.50 8,069.46 4,034.73 0.20 1,613.89 40.00% 0.00 0.00 0.00% 0.20 1,613.89 40.00% 0.30 2,420.84 60.00%
03.03.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 873.91 20.19 17,644.24 12.45 251.37 1.42% 0.00 0.00 0.00% 12.45 251.37 1.42% 861.46 17,393 98.58%
03.03.01.04 REFINE, COMPACTACION Y NIVELACION m2 1,192.67 1.70 2,027.54 33.00 56.10 2.77% 0.00 0.00 0.00% 33.00 56.10 2.77% 1,159.67 1,971.44 97.23%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.03.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.46 33.99 491.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.46 491.50 100.00%
03.03.01.06 CONCRETO f´c=175Kg/cm2 m3 89.00 395.69 35,216.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 89.00 35,216.41 100.00%
03.03.01.07 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 578.56 36.46 21,094.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 578.56 21,094.30 100.00%
03.03.02 TOMA LATERAL TIPO I - CHIWA (26 UND) 16,783.44
03.03.02.01 LIMPIEZA Y DESBROSE MANUAL m2 78.00 0.61 47.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 78.00 47.58 100.00%
03.03.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 49.40 3.85 190.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 49.40 190.19 100.00%
03.03.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 6.64 20.19 134.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.64 134.06 100.00%
03.03.02.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 8.30 13.46 111.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.30 111.72 100.00%
03.03.02.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 85.91 50.06 4,300.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 85.91 4,300.65 100.00%
03.03.02.06 CONCRETO f´c=175Kg/cm2 m3 6.77 395.69 2,678.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.77 2,678.82 100.00%
03.03.02.07 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 66.56 36.46 2,426.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 66.56 2,426.78 100.00%
03.03.02.08 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 26.00 265.14 6,893.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 6,893.64 100.00%
03.03.03 AFORADOR PARSHALL - CANGARI (01 UND) 1,953.75
03.03.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.03.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.03.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.03.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.03.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.03.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.03.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.03.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.03.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.03.03.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.03.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.03.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.03.03.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.03.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.03.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.03.04 PASES PEATONALES - 05 UND 5,169.68
03.03.04.01 LIMPIEZA Y DESBROSE MANUAL m2 28.60 0.61 17.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 28.60 17.45 100.00%
03.03.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 22.00 3.85 84.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 22.00 84.70 100.00%
03.03.04.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 6.67 20.19 134.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.67 134.67 100.00%
03.03.04.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 0.99 15.71 15.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.99 15.55 100.00%
03.03.04.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 6.60 12.11 79.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.60 79.93 100.00%
03.03.04.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 2.64 297.98 786.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.64 786.67 100.00%
03.03.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 35.00 33.99 1,189.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 35.00 1,189.65 100.00%
03.03.04.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 156.07 6.24 973.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 156.07 973.88 100.00%
03.03.04.09 CONCRETO f´c=210Kg/cm2 m3 3.80 419.89 1,595.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.80 1,595.58 100.00%
03.03.04.10 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 15.00 13.52 202.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.00 202.80 100.00%
03.03.04.11 PINTURA LATEX 02 MANOS EN MUROS EXTERIORES m2 15.00 5.92 88.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.00 88.80 100.00%
03.03.05 POZA DESIPADORA DE ENERGIA - CANGARI (02 UND) 2,871.00
03.03.05.01 LIMPIEZA Y DESBROSE MANUAL m2 11.55 0.61 7.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.55 7.05 100.00%
03.03.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 4.88 3.85 18.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.88 18.79 100.00%
03.03.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 5.46 20.19 110.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.46 110.24 100.00%
03.03.05.04 REFINE, COMPACTACION Y NIVELACION m2 21.15 1.70 35.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 21.15 35.96 100.00%
03.03.05.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 6.83 12.11 82.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.83 82.71 100.00%
03.03.05.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 4.88 19.98 97.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.88 97.50 100.00%
03.03.05.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 15.42 33.99 524.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.42 524.13 100.00%
03.03.05.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 86.51 6.24 539.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 86.51 539.82 100.00%
03.03.05.09 CONCRETO f´c=210Kg/cm2 m3 2.15 419.89 902.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.15 902.76 100.00%
03.03.05.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 14.78 24.03 355.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.78 355.16 100.00%
03.03.05.11 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 5.40 36.46 196.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.40 196.88 100.00%
03.04 CANAL LATERAL 04 - CHIWA 42,264.30
03.04.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 04 - CHIWA 30,578.60
03.04.01.01 LIMPIEZA Y DESBROSE MANUAL m2 821.15 0.61 500.90 821.15 500.90 100.00% 0.00 0.00 0.00% 821.15 500.90 100.00% 0.00 0.00 0.00%
03.04.01.02 DEMOLICION MANUAL DE CONCRETO m3 20.69 40.38 835.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.69 835.46 100.00%
03.04.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.10 8,069.46 806.95 0.10 806.95 100.00% 0.00 0.00 0.00% 0.10 806.95 100.00% 0.00 0.00 0.00%
03.04.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 65.52 20.19 1,322.85 65.52 1,322.85 100.00% 0.00 0.00 0.00% 65.52 1,322.85 100.00% 0.00 0.00 0.00%
03.04.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 31.03 13.46 417.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 31.03 417.66 100.00%
03.04.01.06 REFINE, COMPACTACION Y NIVELACION m2 448.30 1.70 762.11 448.30 762.11 100.00% 0.00 0.00 0.00% 448.30 762.11 100.00% 0.00 0.00 0.00%
03.04.01.07 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 5.60 31.32 175.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.60 175.39 100.00%
03.04.01.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 131.81 33.99 4,480.22 131.81 4,480.22 100.00% 0.00 0.00 0.00% 131.81 4,480.22 100.00% 0.00 0.00 0.00%
03.04.01.09 CONCRETO f´c=175Kg/cm2 m3 33.59 395.69 13,291.23 33.59 13,291.23 100.00% 0.00 0.00 0.00% 33.59 13,291.23 100.00% 0.00 0.00 0.00%
03.04.01.10 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 219.03 36.46 7,985.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 219.03 7,985.83 100.00%
03.04.02 TOMA LATERAL TIPO I - CHIWA (15 UND) 9,731.95
03.04.02.01 LIMPIEZA Y DESBROSE MANUAL m2 45.00 0.61 27.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 45.00 27.45 100.00%
03.04.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 28.50 3.85 109.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 28.50 109.73 100.00%
03.04.02.03 DEMOLICION MANUAL DE CONCRETO m3 1.22 40.38 49.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.22 49.26 100.00%
03.04.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 3.83 20.19 77.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.83 77.33 100.00%
03.04.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 4.93 13.46 66.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.93 66.36 100.00%
03.04.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 49.57 50.06 2,481.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 49.57 2,481.47 100.00%
03.04.02.07 CONCRETO f´c=175Kg/cm2 m3 3.90 395.69 1,543.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.90 1,543.19 100.00%
03.04.02.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 38.40 36.46 1,400.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 38.40 1,400.06 100.00%
03.04.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 15.00 265.14 3,977.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.00 3,977.10 100.00%
03.04.03 AFORADOR PARSHALL - CHIWA CL-04 (01 UND) 1,953.75
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.04.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.04.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.04.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.04.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.04.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.04.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.04.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.04.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.04.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.04.03.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.04.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.04.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.04.03.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.04.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.04.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.05 CANAL LATERAL 05 - CHIWA 37,501.75
03.05.01 CONSTRUCCION DEL CANAL LATERAL 04 - CHIWA (L=377M.) 27,855.32
03.05.01.01 LIMPIEZA Y DESBROSE MANUAL m2 569.25 0.61 347.24 569.25 347.24 100.00% 0.00 0.00 0.00% 569.25 347.24 100.00% 0.00 0.00 0.00%
03.05.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.15 8,069.46 1,210.42 0.15 1,210.42 100.00% 0.00 0.00 0.00% 0.15 1,210.42 100.00% 0.00 0.00 0.00%
03.05.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 193.58 20.19 3,908.38 193.58 3,908.38 100.00% 0.00 0.00 0.00% 193.58 3,908.38 100.00% 0.00 0.00 0.00%
03.05.01.04 REFINE, COMPACTACION Y NIVELACION m2 455.40 1.70 774.18 455.40 774.18 100.00% 0.00 0.00 0.00% 455.40 774.18 100.00% 0.00 0.00 0.00%
03.05.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 7.36 33.99 250.17 7.36 250.17 100.00% 0.00 0.00 0.00% 7.36 250.17 100.00% 0.00 0.00 0.00%
03.05.01.06 CONCRETO f´c=175Kg/cm2 m3 33.59 395.69 13,291.23 33.59 13,291.23 100.00% 0.00 0.00 0.00% 33.59 13,291.23 100.00% 0.00 0.00 0.00%
03.05.01.07 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 221.44 36.46 8,073.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 221.44 8,073.70 100.00%
03.05.02 TOMA LATERAL TIPO I - CHIWA (12 UND) 7,692.68
03.05.02.01 LIMPIEZA Y DESBROSE MANUAL m2 36.00 0.61 21.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 36.00 21.96 100.00%
03.05.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 22.80 3.85 87.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 22.80 87.78 100.00%
03.05.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 3.06 20.19 61.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.06 61.78 100.00%
03.05.02.04 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 39.65 50.06 1,984.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 39.65 1,984.88 100.00%
03.05.02.05 CONCRETO f´c=175Kg/cm2 m3 3.12 395.69 1,234.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 1,234.55 100.00%
03.05.02.06 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 30.72 36.46 1,120.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.72 1,120.05 100.00%
03.05.02.07 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 12.00 265.14 3,181.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 3,181.68 100.00%
03.05.03 AFORADOR PARSHALL - CHIWA CL-05 (01 UND) 1,953.75
03.05.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.05.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.05.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.05.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.05.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.05.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.05.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.05.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.05.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.05.03.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.05.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.05.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.05.03.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.05.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.05.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.06 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 06 - VIRU VIRU 45,546.74
03.06.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 06 (SUBLATERAL 02 - 06 Y 01 - 06) VIRU VIRU. 22,221.13
03.06.01.01 LIMPIEZA Y DESBROSE MANUAL m2 2,535.23 0.61 1,546.49 1,774.66 1,082.54 70.00% 0.00 0.00 0.00% 1,774.66 1,082.54 70.00% 760.57 463.95 30.00%
03.06.01.02 DEMOLICION MANUAL DE CONCRETO m3 22.90 40.38 924.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 22.90 924.70 100.00%
03.06.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.05 8,069.46 403.47 0.05 403.47 100.00% 0.00 0.00 0.00% 0.05 403.47 100.00% 0.00 0.00 0.00%
03.06.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 18.82 20.19 379.98 4.05 81.77 21.52% 0.00 0.00 0.00% 4.05 81.77 21.52% 14.77 298.21 78.48%
03.06.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 34.34 13.46 462.22 5.06 68.11 14.74% 0.00 0.00 0.00% 5.06 68.11 14.74% 29.28 394.11 85.26%
03.06.01.06 REFINE, COMPACTACION Y NIVELACION m2 343.98 1.70 584.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 343.98 584.77 100.00%
03.06.01.07 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 12.00 31.32 375.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 375.84 100.00%
03.06.01.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 33.40 33.99 1,135.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 33.40 1,135.27 100.00%
03.06.01.09 CONCRETO f´c=175Kg/cm2 m3 25.95 395.69 10,268.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 25.95 10,268.16 100.00%
03.06.01.10 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 168.41 36.46 6,140.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 168.41 6,140.23 100.00%
03.06.02 TOMA LATERAL TIPO I - VIRU VIRU (24 UND) 15,544.39
03.06.02.01 LIMPIEZA Y DESBROSE MANUAL m2 72.00 0.61 43.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 72.00 43.92 100.00%
03.06.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 45.60 3.85 175.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 45.60 175.56 100.00%
03.06.02.03 DEMOLICION MANUAL DE CONCRETO m3 2.15 40.38 86.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.15 86.82 100.00%
03.06.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 6.13 20.19 123.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.13 123.76 100.00%
03.06.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 7.92 13.46 106.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.92 106.60 100.00%
03.06.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 78.53 50.06 3,931.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 78.53 3,931.21 100.00%
03.06.02.07 CONCRETO f´c=175Kg/cm2 m3 6.25 395.69 2,473.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.25 2,473.06 100.00%
03.06.02.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 61.44 36.46 2,240.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 61.44 2,240.10 100.00%
03.06.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 24.00 265.14 6,363.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 24.00 6,363.36 100.00%
03.06.03 TOMA LATERAL TIPO II - VIRU VIRU (01 UND) 1,166.43
03.06.03.01 LIMPIEZA Y DESBROSE MANUAL m2 2.00 0.61 1.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1.22 100.00%
03.06.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 3.85 5.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.50 5.78 100.00%
03.06.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 40.38 3.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.09 3.63 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.06.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.51 20.19 10.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.51 10.30 100.00%
03.06.03.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 0.65 13.46 8.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.65 8.75 100.00%
03.06.03.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 6.14 50.06 307.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.14 307.37 100.00%
03.06.03.07 CONCRETO f´c=175Kg/cm2 m3 0.52 395.69 205.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.52 205.76 100.00%
03.06.03.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.56 36.46 93.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.56 93.34 100.00%
03.06.03.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 2.00 265.14 530.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 530.28 100.00%
03.06.04 AFORADOR PARSHALL - VIRU VIRU (01 UND) 1,953.75
03.06.04.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.06.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.06.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.06.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.06.04.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.06.04.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.06.04.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.06.04.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.06.04.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.06.04.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.06.04.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.06.04.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.06.04.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.06.04.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.06.04.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.06.05 PASES PEATONALES - VIRU VIRU (02 UND) 2,065.94
03.06.05.01 LIMPIEZA Y DESBROSE MANUAL m2 11.44 0.61 6.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.44 6.98 100.00%
03.06.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 8.80 3.85 33.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.80 33.88 100.00%
03.06.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.51 20.19 50.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.51 50.68 100.00%
03.06.05.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 0.40 15.71 6.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.40 6.28 100.00%
03.06.05.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 2.64 12.11 31.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.64 31.97 100.00%
03.06.05.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 1.06 297.98 315.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.06 315.86 100.00%
03.06.05.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.00 33.99 475.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.00 475.86 100.00%
03.06.05.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 62.43 6.24 389.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 62.43 389.56 100.00%
03.06.05.09 CONCRETO f´c=210Kg/cm2 m3 1.52 419.89 638.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.52 638.23 100.00%
03.06.05.10 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 6.00 13.52 81.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 81.12 100.00%
03.06.05.11 PINTURA LATEX 02 MANOS EN MUROS EXTERIORES m2 6.00 5.92 35.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 35.52 100.00%
03.06.06 POZA DESIPADORA DE ENERGIA - VIRU VIRU (01 UND) 1,442.12
03.06.06.01 LIMPIEZA Y DESBROSE MANUAL m2 5.78 0.61 3.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.78 3.53 100.00%
03.06.06.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 2.44 3.85 9.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.44 9.39 100.00%
03.06.06.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.73 20.19 55.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.73 55.12 100.00%
03.06.06.04 REFINE, COMPACTACION Y NIVELACION m2 10.58 1.70 17.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.58 17.99 100.00%
03.06.06.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 3.41 13.46 45.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.41 45.90 100.00%
03.06.06.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 2.44 19.98 48.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.44 48.75 100.00%
03.06.06.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 7.71 33.99 262.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.71 262.06 100.00%
03.06.06.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 43.25 6.24 269.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 43.25 269.88 100.00%
03.06.06.09 CONCRETO f´c=210Kg/cm2 m3 1.08 419.89 453.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.08 453.48 100.00%
03.06.06.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 7.39 24.03 177.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.39 177.58 100.00%
03.06.06.11 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.70 36.46 98.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.70 98.44 100.00%
03.06.07 PARTIDOR DE CAUDAL TIPO I - VIRU VIRU (01 UND) 1,152.98
03.06.07.01 LIMPIEZA Y DESBROSE MANUAL m2 2.25 0.61 1.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.25 1.37 100.00%
03.06.07.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.43 3.85 5.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.43 5.51 100.00%
03.06.07.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 40.38 3.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.09 3.63 100.00%
03.06.07.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.26 20.19 5.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.26 5.25 100.00%
03.06.07.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 0.32 13.46 4.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.32 4.31 100.00%
03.06.07.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 5.54 50.06 277.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.54 277.33 100.00%
03.06.07.07 CONCRETO f´c=175Kg/cm2 m3 0.26 395.69 102.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.26 102.88 100.00%
03.06.07.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 4.00 36.46 145.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 145.84 100.00%
03.06.07.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.6 und 2.00 303.43 606.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 606.86 100.00%
03.07 MEJORAMIENTO DEL CANAL LATERAL 07 - VIRU VIRU 26,224.45
03.07.01 MEJORAMIENTO DEL CANAL LATERAL 07 - VIRU VIRU. 6,970.56
03.07.01.01 LIMPIEZA Y DESBROSE MANUAL m2 543.00 0.61 331.23 543.00 331.23 100.00% 0.00 0.00 0.00% 543.00 331.23 100.00% 0.00 0.00 0.00%
03.07.01.02 DEMOLICION MANUAL DE CONCRETO m3 7.29 40.38 294.37 1.10 44.42 15.09% 0.00 0.00 0.00% 1.10 44.42 15.09% 6.19 249.95 84.91%
03.07.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.05 8,069.46 403.47 0.05 403.47 100.00% 0.00 0.00 0.00% 0.05 403.47 100.00% 0.00 0.00 0.00%
03.07.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 10.93 13.46 147.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.93 147.12 100.00%
03.07.01.05 REFINE, COMPACTACION Y NIVELACION m2 97.68 1.70 166.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 97.68 166.06 100.00%
03.07.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 29.92 33.99 1,016.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 29.92 1,016.98 100.00%
03.07.01.07 CONCRETO f´c=175Kg/cm2 m3 7.29 395.69 2,884.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.29 2,884.58 100.00%
03.07.01.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 47.36 36.46 1,726.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 47.36 1,726.75 100.00%
03.07.02 TOMA LATERAL TIPO I - VIRU VIRU (03 UND) 15,352.35
03.07.02.01 LIMPIEZA Y DESBROSE MANUAL m2 9.00 0.61 5.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.00 5.49 100.00%
03.07.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 5.70 3.85 21.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.70 21.95 100.00%
03.07.02.03 DEMOLICION MANUAL DE CONCRETO m3 2.15 40.38 86.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.15 86.82 100.00%
03.07.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 6.13 20.19 123.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.13 123.76 100.00%
03.07.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 7.92 13.46 106.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.92 106.60 100.00%
03.07.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 78.53 50.06 3,931.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 78.53 3,931.21 100.00%
03.07.02.07 CONCRETO f´c=175Kg/cm2 m3 6.25 395.69 2,473.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.25 2,473.06 100.00%
03.07.02.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 61.44 36.46 2,240.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 61.44 2,240.10 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.07.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 24.00 265.14 6,363.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 24.00 6,363.36 100.00%
03.07.03 TOMA LATERAL TIPO II - VIRU VIRU (01 UND) 1,947.79
03.07.03.01 LIMPIEZA Y DESBROSE MANUAL m2 9.00 0.61 5.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.00 5.49 100.00%
03.07.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 5.70 3.85 21.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.70 21.95 100.00%
03.07.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.28 40.38 11.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.28 11.31 100.00%
03.07.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.77 20.19 15.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.77 15.55 100.00%
03.07.03.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 0.99 13.46 13.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.99 13.33 100.00%
03.07.03.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 9.91 50.06 496.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.91 496.09 100.00%
03.07.03.07 CONCRETO f´c=175Kg/cm2 m3 0.78 395.69 308.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.78 308.64 100.00%
03.07.03.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 7.68 36.46 280.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.68 280.01 100.00%
03.07.03.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 3.00 265.14 795.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 795.42 100.00%
03.07.04 AFORADOR PARSHALL - VIRU VIRU (01 UND) 1,953.75
03.07.04.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.07.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.07.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.07.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.07.04.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.07.04.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.07.04.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.07.04.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.07.04.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.07.04.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.07.04.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.07.04.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.07.04.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.07.04.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.07.04.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.08 CANAL LATERAL 08 - CHACCO 44,547.60
03.08.01 CONSTRUCCION DEL CANAL LATERAL 08 - CHACCO (L=384m.) 32,044.23
03.08.01.01 LIMPIEZA Y DESBROSE MANUAL m2 633.60 0.61 386.50 633.60 386.50 100.00% 0.00 0.00 0.00% 633.60 386.50 100.00% 0.00 0.00 0.00%
03.08.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.15 8,069.46 1,210.42 0.15 1,210.42 100.00% 0.00 0.00 0.00% 0.15 1,210.42 100.00% 0.00 0.00 0.00%
03.08.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 270.01 20.19 5,451.50 270.01 5,451.50 100.00% 0.00 0.00 0.00% 270.01 5,451.50 100.00% 0.00 0.00 0.00%
03.08.01.04 REFINE, COMPACTACION Y NIVELACION m2 506.88 1.70 861.70 396.00 673.20 78.13% 0.00 0.00 0.00% 396.00 673.20 78.13% 110.88 188.50 21.88%
03.08.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.14 33.99 208.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.14 208.70 100.00%
03.08.01.06 CONCRETO f´c=175Kg/cm2 m3 37.82 395.69 14,965.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 37.82 14,965.00 100.00%
03.08.01.07 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 245.76 36.46 8,960.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 245.76 8,960.41 100.00%
03.08.02 TOMA LATERAL TIPO I - CHACCO (08 UND) 6,567.23
03.08.02.01 LIMPIEZA Y DESBROSE MANUAL m2 12.00 0.61 7.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 7.32 100.00%
03.08.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 7.60 3.85 29.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.60 29.26 100.00%
03.08.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.02 20.19 20.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.02 20.59 100.00%
03.08.02.04 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 1.02 50.06 51.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.02 51.06 100.00%
03.08.02.05 CONCRETO f´c=175Kg/cm2 m3 3.64 395.69 1,440.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.64 1,440.31 100.00%
03.08.02.06 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 35.84 36.46 1,306.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 35.84 1,306.73 100.00%
03.08.02.07 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 14.00 265.14 3,711.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.00 3,711.96 100.00%
03.08.03 TOMA LATERAL TIPO II - CHACCO (01 UND) 2,544.87
03.08.03.01 LIMPIEZA Y DESBROSE MANUAL m2 4.00 0.61 2.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 2.44 100.00%
03.08.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 3.85 5.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.50 5.78 100.00%
03.08.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 40.38 3.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.09 3.63 100.00%
03.08.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.51 20.19 10.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.51 10.30 100.00%
03.08.03.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 1.28 12.11 15.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.28 15.50 100.00%
03.08.03.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 13.22 50.06 661.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.22 661.79 100.00%
03.08.03.07 CONCRETO f´c=175Kg/cm2 m3 1.04 395.69 411.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.04 411.52 100.00%
03.08.03.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 10.24 36.46 373.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.24 373.35 100.00%
03.08.03.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 4.00 265.14 1,060.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 1,060.56 100.00%
03.08.04 AFORADOR PARSHALL - CHACCO (01 UND) 1,953.75
03.08.04.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.08.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.08.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.08.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.08.04.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.08.04.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.08.04.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.08.04.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.08.04.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.08.04.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.08.04.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.08.04.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.08.04.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.08.04.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.08.04.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.08.05 POZA DESIPADORA DE ENERGIA - CHACCO (01 UND) 1,437.52
03.08.05.01 LIMPIEZA Y DESBROSE MANUAL m2 5.78 0.61 3.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.78 3.53 100.00%
03.08.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 2.44 3.85 9.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.44 9.39 100.00%
03.08.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.73 20.19 55.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.73 55.12 100.00%
03.08.05.04 REFINE, COMPACTACION Y NIVELACION m2 10.58 1.70 17.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.58 17.99 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.08.05.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 3.41 12.11 41.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.41 41.30 100.00%
03.08.05.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 2.44 19.98 48.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.44 48.75 100.00%
03.08.05.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 7.71 33.99 262.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.71 262.06 100.00%
03.08.05.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 43.25 6.24 269.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 43.25 269.88 100.00%
03.08.05.09 CONCRETO f´c=210Kg/cm2 m3 1.08 419.89 453.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.08 453.48 100.00%
03.08.05.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 7.39 24.03 177.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.39 177.58 100.00%
03.08.05.11 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.70 36.46 98.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.70 98.44 100.00%
03.09 CANAL LATERAL 09 - CHACCO 90,751.37
03.09.01 CONSTRUCCION DEL CANAL LATERAL 09 (SUBLATERAL 01 - 09, 02 - 09 Y ,3-09) - CHACCO. 73,720.48
03.09.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,498.02 0.61 913.79 1,498.02 913.79 100.00% 0.00 0.00 0.00% 1,498.02 913.79 100.00% 0.00 0.00 0.00%
03.09.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.25 8,069.46 2,017.37 0.25 2,017.37 100.00% 0.00 0.00 0.00% 0.25 2,017.37 100.00% 0.00 0.00 0.00%
03.09.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 578.70 20.19 11,683.95 500.70 10,109.13 86.52% 0.00 0.00 0.00% 500.70 10,109.13 86.52% 78.00 1,574.82 13.48%
03.09.01.04 REFINE, COMPACTACION Y NIVELACION m2 1,198.41 1.70 2,037.30 1,119.21 1,902.66 93.39% 0.00 0.00 0.00% 1,119.21 1,902.66 93.39% 79.20 134.64 6.61%
03.09.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.53 33.99 493.87 14.53 493.81 99.99% 0.00 0.00 0.00% 14.53 493.81 99.99% 0.00 0.07 0.01%
03.09.01.06 CONCRETO f´c=175Kg/cm2 m3 89.43 395.69 35,386.56 56.55 22,376.27 63.23% 0.00 0.00 0.00% 56.55 22,376.27 63.23% 32.88 13,010.29 36.77%
03.09.01.07 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 581.12 36.46 21,187.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 581.12 21,187.64 100.00%
03.09.02 TOMA LATERAL TIPO I - CHACCO (09 UND) 5,804.50
03.09.02.01 LIMPIEZA Y DESBROSE MANUAL m2 27.00 0.61 16.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.00 16.47 100.00%
03.09.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 17.10 3.85 65.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.10 65.84 100.00%
03.09.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.30 20.19 46.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.30 46.44 100.00%
03.09.02.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 2.87 12.11 34.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.87 34.76 100.00%
03.09.02.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 29.74 50.06 1,488.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 29.74 1,488.78 100.00%
03.09.02.06 CONCRETO f´c=175Kg/cm2 m3 2.34 395.69 925.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.34 925.91 100.00%
03.09.02.07 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 23.04 36.46 840.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23.04 840.04 100.00%
03.09.02.08 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 9.00 265.14 2,386.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.00 2,386.26 100.00%
03.09.03 TOMA LATERAL TIPO II - CHACCO (02 UND) 2,325.93
03.09.03.01 LIMPIEZA Y DESBROSE MANUAL m2 8.00 0.61 4.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 4.88 100.00%
03.09.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 3.00 3.85 11.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 11.55 100.00%
03.09.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 40.38 3.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.09 3.63 100.00%
03.09.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.02 20.19 20.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.02 20.59 100.00%
03.09.03.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 1.30 12.11 15.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.30 15.74 100.00%
03.09.03.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 12.28 50.06 614.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.28 614.74 100.00%
03.09.03.07 CONCRETO f´c=175Kg/cm2 m3 1.03 395.69 407.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.03 407.56 100.00%
03.09.03.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 5.12 36.46 186.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.12 186.68 100.00%
03.09.03.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 4.00 265.14 1,060.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 1,060.56 100.00%
03.09.04 AFORADOR PARSHALL - CHACCO (01 UND) 1,953.75
03.09.04.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.09.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.09.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.09.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.09.04.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.09.04.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.09.04.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.09.04.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.09.04.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.09.04.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.09.04.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.09.04.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.09.04.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.09.04.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.09.04.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.09.05 POZA DESIPADORA DE ENERGIA - CHACCO (04 UND) 5,745.98
03.09.05.01 LIMPIEZA Y DESBROSE MANUAL m2 23.10 0.61 14.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23.10 14.09 100.00%
03.09.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 9.75 3.85 37.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.75 37.54 100.00%
03.09.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 10.92 20.19 220.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.92 220.47 100.00%
03.09.05.04 REFINE, COMPACTACION Y NIVELACION m2 42.31 1.70 71.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 42.31 71.93 100.00%
03.09.05.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 13.66 12.11 165.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.66 165.42 100.00%
03.09.05.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 9.75 19.98 194.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.75 194.81 100.00%
03.09.05.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 30.84 33.99 1,048.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.84 1,048.25 100.00%
03.09.05.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 173.02 6.24 1,079.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 173.02 1,079.64 100.00%
03.09.05.09 CONCRETO f´c=210Kg/cm2 m3 4.31 419.89 1,809.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.31 1,809.73 100.00%
03.09.05.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 29.56 24.03 710.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 29.56 710.33 100.00%
03.09.05.11 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 10.80 36.46 393.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.80 393.77 100.00%
03.09.06 PARTIDOR DE CAUDAL TIPO II - CHACCO (01 UND) 1,200.73
03.09.06.01 LIMPIEZA Y DESBROSE MANUAL m2 2.25 0.61 1.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.25 1.37 100.00%
03.09.06.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 3.85 5.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.50 5.78 100.00%
03.09.06.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 40.38 3.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.09 3.63 100.00%
03.09.06.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.26 20.19 5.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.26 5.25 100.00%
03.09.06.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 0.32 13.46 4.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.32 4.31 100.00%
03.09.06.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 5.54 50.06 277.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.54 277.33 100.00%
03.09.06.07 CONCRETO f´c=175Kg/cm2 m3 0.38 395.69 150.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 150.36 100.00%
03.09.06.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 4.00 36.46 145.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 145.84 100.00%
03.09.06.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.6 und 2.00 303.43 606.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 606.86 100.00%
03.10 CANAL LATERAL 10 - CHACCO 30,925.22
03.10.01 CONSTRUCCION DEL CANAL LATERAL 10 - CHACCO (L=236m.) 24,165.69
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.10.01.01 LIMPIEZA Y DESBROSE MANUAL m2 389.40 0.61 237.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 389.40 237.53 100.00%
03.10.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.30 8,069.46 2,420.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.30 2,420.84 100.00%
03.10.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 301.37 20.19 6,084.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 301.37 6,084.66 100.00%
03.10.01.04 REFINE, COMPACTACION Y NIVELACION m2 311.52 1.70 529.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 311.52 529.58 100.00%
03.10.01.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 1.30 12.11 15.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.30 15.74 100.00%
03.10.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 5.02 33.99 170.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.02 170.63 100.00%
03.10.01.07 CONCRETO f´c=175Kg/cm2 m3 23.25 395.69 9,199.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23.25 9,199.79 100.00%
03.10.01.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 151.04 36.46 5,506.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 151.04 5,506.92 100.00%
03.10.02 TOMA LATERAL TIPO I - CHACCO (03 UND) 1,934.78
03.10.02.01 LIMPIEZA Y DESBROSE MANUAL m2 9.00 0.61 5.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.00 5.49 100.00%
03.10.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 5.70 3.85 21.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.70 21.95 100.00%
03.10.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.77 20.19 15.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.77 15.55 100.00%
03.10.02.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 0.96 12.11 11.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.96 11.63 100.00%
03.10.02.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 9.91 50.06 496.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.91 496.09 100.00%
03.10.02.06 CONCRETO f´c=175Kg/cm2 m3 0.78 395.69 308.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.78 308.64 100.00%
03.10.02.07 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 7.68 36.46 280.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.68 280.01 100.00%
03.10.02.08 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 3.00 265.14 795.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 795.42 100.00%
03.10.03 AFORADOR PARSHALL - CHACCO (01 UND) 1,953.75
03.10.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.10.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.10.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.10.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.10.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.10.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.10.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.10.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.10.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.10.03.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.10.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.10.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.10.03.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.10.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.10.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.10.04 POZA DESIPADORA DE ENERGIA - CHACCO (02 UND) 2,871.00
03.10.04.01 LIMPIEZA Y DESBROSE MANUAL m2 11.55 0.61 7.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.55 7.05 100.00%
03.10.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 4.88 3.85 18.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.88 18.79 100.00%
03.10.04.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 5.46 20.19 110.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.46 110.24 100.00%
03.10.04.04 REFINE, COMPACTACION Y NIVELACION m2 21.15 1.70 35.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 21.15 35.96 100.00%
03.10.04.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 6.83 12.11 82.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.83 82.71 100.00%
03.10.04.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 4.88 19.98 97.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.88 97.50 100.00%
03.10.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 15.42 33.99 524.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.42 524.13 100.00%
03.10.04.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 86.51 6.24 539.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 86.51 539.82 100.00%
03.10.04.09 CONCRETO f´c=210Kg/cm2 m3 2.15 419.89 902.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.15 902.76 100.00%
03.10.04.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 14.78 24.03 355.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.78 355.16 100.00%
03.10.04.11 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 5.40 36.46 196.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.40 196.88 100.00%
03.11 CANAL LATERAL 11 - CHACCO 42,920.07
03.11.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 11 - CHACCO 26,330.44
03.11.01.01 LIMPIEZA Y DESBROSE MANUAL m2 607.98 0.61 370.87 607.98 370.87 100.00% 0.00 0.00 0.00% 607.98 370.87 100.00% 0.00 0.00 0.00%
03.11.01.02 DEMOLICION MANUAL DE CONCRETO m3 1.18 40.38 47.65 1.18 47.65 100.00% 0.00 0.00 0.00% 1.18 47.65 100.00% 0.00 0.00 0.00%
03.11.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.15 8,069.46 1,210.42 0.15 1,210.42 100.00% 0.00 0.00 0.00% 0.15 1,210.42 100.00% 0.00 0.00 0.00%
03.11.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 189.95 20.19 3,835.09 189.95 3,835.09 100.00% 0.00 0.00 0.00% 189.95 3,835.09 100.00% 0.00 0.00 0.00%
03.11.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 1.78 13.46 23.96 1.78 23.96 100.00% 0.00 0.00 0.00% 1.78 23.96 100.00% 0.00 0.00 0.00%
03.11.01.06 REFINE, COMPACTACION Y NIVELACION m2 394.48 1.70 670.62 320.48 544.82 81.24% 0.00 0.00 0.00% 320.48 544.82 81.24% 74.00 125.80 18.76%
03.11.01.07 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 3.20 31.32 100.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.20 100.22 100.00%
03.11.01.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 41.21 33.99 1,400.73 41.21 1,400.73 100.00% 0.00 0.00 0.00% 41.21 1,400.73 100.00% 0.00 0.00 0.00%
03.11.01.09 CONCRETO f´c=175Kg/cm2 m3 29.52 395.69 11,680.77 26.65 10,545.14 90.28% 0.00 0.00 0.00% 26.65 10,545.14 90.28% 2.87 1,135.63 9.72%
03.11.01.10 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 191.72 36.46 6,990.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 191.72 6,990.11 100.00%
03.11.02 TOMA LATERAL TIPO I _SUBLATERAL 01-11 Y SUBLATERAL 03-11 DE CHACCO (07 UND) 4,514.56 0.00 0.00
03.11.02.01 LIMPIEZA Y DESBROSE MANUAL m2 21.00 0.61 12.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 21.00 12.81 100.00%
03.11.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 13.30 3.85 51.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.30 51.21 100.00%
03.11.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.79 20.19 36.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.79 36.14 100.00%
03.11.02.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 2.23 12.11 27.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.23 27.01 100.00%
03.11.02.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 23.13 50.06 1,157.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23.13 1,157.89 100.00%
03.11.02.06 CONCRETO f´c=175Kg/cm2 m3 1.82 395.69 720.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.82 720.16 100.00%
03.11.02.07 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 17.92 36.46 653.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.92 653.36 100.00%
03.11.02.08 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 7.00 265.14 1,855.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.00 1,855.98 100.00%
03.11.03 AFORADOR PARSHALL - CHACCO (01 UND) 1,953.75
03.11.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.11.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.11.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.11.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.11.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.11.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.11.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.11.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.11.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.11.03.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.11.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.11.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.11.03.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.11.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.11.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.11.04 PARTIDOR DE CAUDAL TIPO II - CHACCO (01 UND) 1,504.16
03.11.04.01 LIMPIEZA Y DESBROSE MANUAL m2 2.25 0.61 1.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.25 1.37 100.00%
03.11.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 3.85 5.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.50 5.78 100.00%
03.11.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 40.38 3.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.09 3.63 100.00%
03.11.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.26 20.19 5.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.26 5.25 100.00%
03.11.04.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 0.32 13.46 4.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.32 4.31 100.00%
03.11.04.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 5.54 50.06 277.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.54 277.33 100.00%
03.11.04.07 CONCRETO f´c=175Kg/cm2 m3 0.38 395.69 150.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 150.36 100.00%
03.11.04.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 4.00 36.46 145.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 145.84 100.00%
03.11.04.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.6 und 3.00 303.43 910.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 910.29 100.00%
03.11.05 POZA DESIPADORA DE ENERGIA (SUBLATERAL 01-11, 02-11 Y 03-11) (06 UND) 8,617.16
03.11.05.01 LIMPIEZA Y DESBROSE MANUAL m2 34.65 0.61 21.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 34.65 21.14 100.00%
03.11.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 14.63 3.85 56.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.63 56.33 100.00%
03.11.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 16.39 20.19 330.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16.39 330.91 100.00%
03.11.05.04 REFINE, COMPACTACION Y NIVELACION m2 63.46 1.70 107.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 63.46 107.88 100.00%
03.11.05.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 20.48 12.11 248.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.48 248.01 100.00%
03.11.05.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 14.63 19.98 292.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.63 292.31 100.00%
03.11.05.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 46.27 33.99 1,572.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 46.27 1,572.72 100.00%
03.11.05.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 259.53 6.24 1,619.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 259.53 1,619.47 100.00%
03.11.05.09 CONCRETO f´c=210Kg/cm2 m3 6.46 419.89 2,712.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.46 2,712.49 100.00%
03.11.05.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 44.33 24.03 1,065.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 44.33 1,065.25 100.00%
03.11.05.11 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 16.20 36.46 590.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16.20 590.65 100.00%
03.12 CANAL LATERAL 12 - CHACCO 26,040.85
03.12.01 MEJORAMIENTO DEL CANAL LATERAL 12 - CHACCO 17,680.45
03.12.01.01 LIMPIEZA Y DESBROSE MANUAL m2 3,061.17 0.61 1,867.31 2,061.17 1,257.31 67.33% 0.00 0.00 0.00% 2,061.17 1,257.31 67.33% 1,000.00 610.00 32.67%
03.12.01.02 DEMOLICION MANUAL DE CONCRETO m3 19.80 40.38 799.52 0.99 39.77 4.97% 0.00 0.00 0.00% 0.99 39.77 4.97% 18.82 759.75 95.03%
03.12.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.08 8,069.46 645.56 0.08 645.56 100.00% 0.00 0.00 0.00% 0.08 645.56 100.00% 0.00 0.00 0.00%
03.12.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 29.70 13.46 399.76 1.48 19.88 4.97% 0.00 0.00 0.00% 1.48 19.88 4.97% 28.22 379.88 95.03%
03.12.01.05 REFINE, COMPACTACION Y NIVELACION m2 265.32 1.70 451.04 46.20 78.54 17.41% 0.00 0.00 0.00% 46.20 78.54 17.41% 219.12 372.50 82.59%
03.12.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 28.51 33.99 969.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 28.51 969.05 100.00%
03.12.01.07 CONCRETO f´c=175Kg/cm2 m3 19.80 395.69 7,834.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 19.80 7,834.66 100.00%
03.12.01.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 129.28 36.46 4,713.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 129.28 4,713.55 100.00%
03.12.02 TOMA LATERAL TIPO I CHACCO (09 UND) 5,843.64
03.12.02.01 LIMPIEZA Y DESBROSE MANUAL m2 27.00 0.61 16.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.00 16.47 100.00%
03.12.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 17.10 3.85 65.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.10 65.84 100.00%
03.12.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.84 40.38 33.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.84 33.92 100.00%
03.12.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.30 20.19 46.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.30 46.44 100.00%
03.12.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.97 13.46 39.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.97 39.98 100.00%
03.12.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 29.74 50.06 1,488.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 29.74 1,488.78 100.00%
03.12.02.07 CONCRETO f´c=175Kg/cm2 m3 2.34 395.69 925.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.34 925.91 100.00%
03.12.02.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 23.04 36.46 840.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23.04 840.04 100.00%
03.12.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 9.00 265.14 2,386.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.00 2,386.26 100.00%
03.12.03 AFORADOR PARSHALL - CHACCO (01 UND) 1,953.75
03.12.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.12.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.12.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.12.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.12.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.12.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.12.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.12.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.12.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.12.03.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.12.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.12.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.12.03.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.12.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.12.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.12.04 REHABILITACION DE POZA DISIPADORA DE ENERGIA CL 12 - CHACCO (03 UND) 563.01
03.12.04.01 LIMPIEZA Y DESBROSE MANUAL m2 17.33 0.61 10.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.33 10.57 100.00%
03.12.04.02 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 0.98 10.09 9.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.98 9.89 100.00%
03.12.04.03 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 3.90 72.87 284.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.90 284.19 100.00%
03.12.04.04 SELLADO DE GRIETAS Y FISURAS ep=2cm m 6.00 43.06 258.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 258.36 100.00%
03.13 CANAL LATERAL 13 - AZANGARO GRANDE 30,671.28
03.13.01 MEJORAMIENTO CANAL LATERAL 13 - AZANGARO GRANDE 21,387.31
03.13.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,714.00 0.61 1,045.54 1,714.00 1,045.54 100.00% 0.00 0.00 0.00% 1,714.00 1,045.54 100.00% 0.00 0.00 0.00%
03.13.01.02 DEMOLICION MANUAL DE CONCRETO m3 25.51 40.38 1,030.09 25.51 1,030.09 100.00% 0.00 0.00 0.00% 25.51 1,030.09 100.00% 0.00 0.00 0.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.13.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.10 8,069.46 806.95 0.10 806.95 100.00% 0.00 0.00 0.00% 0.10 806.95 100.00% 0.00 0.00 0.00%
03.13.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 38.27 13.46 515.11 38.27 515.11 100.00% 0.00 0.00 0.00% 38.27 515.11 100.00% 0.00 0.00 0.00%
03.13.01.05 REFINE, COMPACTACION Y NIVELACION m2 341.88 1.70 581.20 260.04 442.07 76.06% 0.00 0.00 0.00% 260.04 442.07 76.06% 81.84 139.13 23.94%
03.13.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 36.70 33.99 1,247.43 36.70 1,247.43 100.00% 0.00 0.00 0.00% 36.70 1,247.43 100.00% 0.00 0.00 0.00%
03.13.01.07 CONCRETO f´c=175Kg/cm2 m3 25.51 395.69 10,094.05 25.51 10,094.05 100.00% 0.00 0.00 0.00% 25.51 10,094.05 100.00% 0.00 0.00 0.00%
03.13.01.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 166.40 36.46 6,066.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 166.40 6,066.94 100.00%
03.13.02 TOMA LATERAL TIPO I - AZANGARO GRANDE (11 UND) 7,142.51
03.13.02.01 LIMPIEZA Y DESBROSE MANUAL m2 33.00 0.61 20.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 33.00 20.13 100.00%
03.13.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 20.90 3.85 80.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.90 80.47 100.00%
03.13.02.03 DEMOLICION MANUAL DE CONCRETO m3 1.03 40.38 41.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.03 41.59 100.00%
03.13.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.81 20.19 56.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.81 56.73 100.00%
03.13.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 3.64 13.46 48.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.64 48.99 100.00%
03.13.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 36.35 50.06 1,819.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 36.35 1,819.68 100.00%
03.13.02.07 CONCRETO f´c=175Kg/cm2 m3 2.86 395.69 1,131.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.86 1,131.67 100.00%
03.13.02.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 28.16 36.46 1,026.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 28.16 1,026.71 100.00%
03.13.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 11.00 265.14 2,916.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.00 2,916.54 100.00%
03.13.03 AFORADOR PARSHALL - AZANGARO (01 UND) 1,953.75
03.13.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.13.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.13.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.13.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.13.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.13.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.13.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.13.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.13.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.13.03.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.13.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.13.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.13.03.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.13.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.13.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.13.04 REHABILITACION DE POZA DISIPADORA DE ENERGIA CL 13 - AZANGARO GRANDE (01 UND) 187.71
03.13.04.01 LIMPIEZA Y DESBROSE MANUAL m2 5.78 0.61 3.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.78 3.53 100.00%
03.13.04.02 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 0.33 10.09 3.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.33 3.33 100.00%
03.13.04.03 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 1.30 72.87 94.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.30 94.73 100.00%
03.13.04.04 SELLADO DE GRIETAS Y FISURAS ep=2cm m 2.00 43.06 86.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 86.12 100.00%
03.14 CANAL LATERAL 14 - AZANGARO 1 65,940.07
03.14.01 MEJORAMIENTO DEL CANAL LATERAL 14, SUBLATERAL (01 - 14, 02-01-14, 02-14, 01-01 -14) AZANGARO 1. 51,296.19
03.14.01.01 LIMPIEZA Y DESBROSE MANUAL m2 2,595.00 0.61 1,582.95 2,595.00 1,582.95 100.00% 0.00 0.00 0.00% 2,595.00 1,582.95 100.00% 0.00 0.00 0.00%
03.14.01.02 DEMOLICION MANUAL DE CONCRETO m3 63.43 40.38 2,561.30 6.90 278.62 10.88% 0.00 0.00 0.00% 6.90 278.62 10.88% 56.53 2,282.68 89.12%
03.14.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.15 8,069.46 1,210.42 0.15 1,210.42 100.00% 0.00 0.00 0.00% 0.15 1,210.42 100.00% 0.00 0.00 0.00%
03.14.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 95.15 13.46 1,280.72 10.34 139.18 10.87% 0.00 0.00 0.00% 10.34 139.18 10.87% 84.81 1,141.54 89.13%
03.14.01.05 REFINE, COMPACTACION Y NIVELACION m2 850.08 1.70 1,445.14 92.40 157.08 10.87% 0.00 0.00 0.00% 92.40 157.08 10.87% 757.68 1,288.06 89.13%
03.14.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 90.90 33.99 3,089.69 39.52 1,343.28 43.48% 0.00 0.00 0.00% 39.52 1,343.28 43.48% 51.38 1,746.41 56.52%
03.14.01.07 CONCRETO f´c=175Kg/cm2 m3 63.43 395.69 25,098.62 10.19 4,032.08 16.06% 0.00 0.00 0.00% 10.19 4,032.08 16.06% 53.24 21,066.54 83.94%
03.14.01.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 412.16 36.46 15,027.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 412.16 15,027.35 100.00%
03.14.02 TOMA LATERAL TIPO I EN CL 14 (SUBLATERAL 01 - 14, 02-01-14, 02-14 Y 01-01 -14) - 14 und 9,090.31
03.14.02.01 LIMPIEZA Y DESBROSE MANUAL m2 42.00 0.61 25.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 42.00 25.62 100.00%
03.14.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 26.60 3.85 102.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.60 102.41 100.00%
03.14.02.03 DEMOLICION MANUAL DE CONCRETO m3 1.31 40.38 52.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.31 52.90 100.00%
03.14.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 3.58 20.19 72.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.58 72.28 100.00%
03.14.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 4.63 13.46 62.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.63 62.32 100.00%
03.14.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 46.26 50.06 2,315.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 46.26 2,315.78 100.00%
03.14.02.07 CONCRETO f´c=175Kg/cm2 m3 3.64 395.69 1,440.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.64 1,440.31 100.00%
03.14.02.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 35.84 36.46 1,306.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 35.84 1,306.73 100.00%
03.14.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 14.00 265.14 3,711.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.00 3,711.96 100.00%
03.14.03 AFORADOR PARSHALL - AZANGARO (01 UND) 1,953.75
03.14.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.14.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.14.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.14.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.14.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.14.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.14.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.14.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.14.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.14.03.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.14.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.14.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.14.03.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.14.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.14.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.14.04 REHABILITACION DE POZA DISIPADORA DE ENERGIA CL 14 - AZANGARO 1 (07 UND) 476.61
03.14.04.01 LIMPIEZA Y DESBROSE MANUAL m2 40.43 0.61 24.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 40.43 24.66 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.14.04.02 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 2.28 10.09 23.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.28 23.01 100.00%
03.14.04.03 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 1.75 72.87 127.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.75 127.52 100.00%
03.14.04.04 SELLADO DE GRIETAS Y FISURAS ep=2cm m 7.00 43.06 301.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.00 301.42 100.00%
03.14.05 PARTIDOR DE CAUDAL TIPO I - AZANGARO 1 (03 UND) 3,123.21
03.14.05.01 LIMPIEZA Y DESBROSE MANUAL m2 6.75 0.61 4.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.75 4.12 100.00%
03.14.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 4.28 3.85 16.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.28 16.48 100.00%
03.14.05.03 DEMOLICION MANUAL DE CONCRETO m3 0.28 40.38 11.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.28 11.31 100.00%
03.14.05.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.77 20.19 15.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.77 15.55 100.00%
03.14.05.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 0.96 13.46 12.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.96 12.92 100.00%
03.14.05.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 9.91 50.06 496.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.91 496.09 100.00%
03.14.05.07 CONCRETO f´c=175Kg/cm2 m3 0.78 395.69 308.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.78 308.64 100.00%
03.14.05.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 12.00 36.46 437.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 437.52 100.00%
03.14.05.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.6 und 6.00 303.43 1,820.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 1,820.58 100.00%
03.15 CANAL LATERAL 15 - AZANGARO 28,107.13
03.15.01 MEJORAMIENTO DEL CANAL LATERAL 15 DE AZANGARO. 22,257.52
03.15.01.01 LIMPIEZA Y DESBROSE MANUAL m2 842.00 0.61 513.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 842.00 513.62 100.00%
03.15.01.02 DEMOLICION MANUAL DE CONCRETO m3 27.38 40.38 1,105.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.38 1,105.60 100.00%
03.15.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.10 8,069.46 806.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.10 806.95 100.00%
03.15.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 41.07 13.46 552.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 41.07 552.80 100.00%
03.15.01.05 REFINE, COMPACTACION Y NIVELACION m2 366.96 1.70 623.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 366.96 623.83 100.00%
03.15.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 39.24 33.99 1,333.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 39.24 1,333.77 100.00%
03.15.01.07 CONCRETO f´c=175Kg/cm2 m3 27.38 395.69 10,833.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.38 10,833.99 100.00%
03.15.01.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 177.92 36.46 6,486.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 177.92 6,486.96 100.00%
03.15.02 TOMA LATERAL TIPO I - AZANGARO (06 UND) 3,895.86
03.15.02.01 LIMPIEZA Y DESBROSE MANUAL m2 18.00 0.61 10.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.00 10.98 100.00%
03.15.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 11.40 3.85 43.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.40 43.89 100.00%
03.15.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.56 40.38 22.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.56 22.61 100.00%
03.15.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.53 20.19 30.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.53 30.89 100.00%
03.15.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 1.98 13.46 26.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.98 26.65 100.00%
03.15.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 19.83 50.06 992.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 19.83 992.69 100.00%
03.15.02.07 CONCRETO f´c=175Kg/cm2 m3 1.56 395.69 617.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.56 617.28 100.00%
03.15.02.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 15.36 36.46 560.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.36 560.03 100.00%
03.15.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 6.00 265.14 1,590.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 1,590.84 100.00%
03.15.03 AFORADOR PARSHALL - AZANGARO (01 UND) 1,953.75
03.15.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.15.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.15.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.15.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.15.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.15.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.15.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.15.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.15.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.15.03.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.15.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.15.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.15.03.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.15.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.15.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.16 CANAL LATERAL 16 - AZANGARO 37,037.22
03.16.01 MEJORAMIENTO DEL CANAL LATERAL 16 - AZANGARO 29,888.85
03.16.01.01 LIMPIEZA Y DESBROSE MANUAL m2 731.00 0.61 445.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 731.00 445.91 100.00%
03.16.01.02 DEMOLICION MANUAL DE CONCRETO m3 39.12 40.38 1,579.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 39.12 1,579.67 100.00%
03.16.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.08 8,069.46 645.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.08 645.56 100.00%
03.16.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 58.68 13.46 789.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 58.68 789.83 100.00%
03.16.01.05 REFINE, COMPACTACION Y NIVELACION m2 500.54 1.70 850.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 500.54 850.92 100.00%
03.16.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 31.01 33.99 1,054.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 31.01 1,054.03 100.00%
03.16.01.07 CONCRETO f´c=175Kg/cm2 m3 39.12 395.69 15,479.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 39.12 15,479.39 100.00%
03.16.01.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 248.04 36.46 9,043.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 248.04 9,043.54 100.00%
03.16.02 TOMA LATERAL TIPO I - CANAL LATERAL 16 AZANGARO (08 UND) 5,194.62
03.16.02.01 LIMPIEZA Y DESBROSE MANUAL m2 24.00 0.61 14.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 24.00 14.64 100.00%
03.16.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 15.20 3.85 58.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.20 58.52 100.00%
03.16.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.75 40.38 30.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.75 30.29 100.00%
03.16.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.04 20.19 41.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.04 41.19 100.00%
03.16.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.64 13.46 35.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.64 35.53 100.00%
03.16.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 26.44 50.06 1,323.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.44 1,323.59 100.00%
03.16.02.07 CONCRETO f´c=175Kg/cm2 m3 2.08 395.69 823.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.08 823.04 100.00%
03.16.02.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 20.48 36.46 746.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.48 746.70 100.00%
03.16.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 8.00 265.14 2,121.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 2,121.12 100.00%
03.16.03 AFORADOR PARSHALL - AZANGARO (01 UND) 1,953.75
03.16.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.16.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.16.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.16.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.16.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.16.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.16.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.16.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.16.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.16.03.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.16.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.16.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.16.03.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.16.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.16.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.17 CANAL LATERAL 17 DE AZANGARO 62,579.93
03.17.01 CONSTRUCCION DEL CANAL LATERAL 17 (SUBLATERALES 03 - 17, 01-17 Y 02-17) (Lt=801m.) 48,822.14
03.17.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,321.65 0.61 806.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,321.65 806.21 100.00%
03.17.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.40 8,069.46 3,227.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.40 3,227.78 100.00%
03.17.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 406.67 20.19 8,210.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 406.67 8,210.67 100.00%
03.17.01.04 REFINE, COMPACTACION Y NIVELACION m2 1,057.32 1.70 1,797.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,057.32 1,797.44 100.00%
03.17.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 12.83 33.99 436.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.83 436.09 100.00%
03.17.01.06 CONCRETO f´c=175Kg/cm2 m3 39.50 395.69 15,629.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 39.50 15,629.76 100.00%
03.17.01.07 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 513.28 36.46 18,714.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 513.28 18,714.19 100.00%
03.17.02 TOMA LATERAL TIPO I - CL 17 (SUBLATERALES 03 - 17, 01-17 Y 02-17) 06 UND 3,051.18
03.17.02.01 LIMPIEZA Y DESBROSE MANUAL m2 18.00 0.61 10.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.00 10.98 100.00%
03.17.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 11.40 3.85 43.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.40 43.89 100.00%
03.17.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.53 20.19 30.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.53 30.89 100.00%
03.17.02.04 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 19.83 50.06 992.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 19.83 992.69 100.00%
03.17.02.05 CONCRETO f´c=175Kg/cm2 m3 1.56 395.69 617.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.56 617.28 100.00%
03.17.02.06 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 15.36 36.46 560.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.36 560.03 100.00%
03.17.02.07 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 3.00 265.14 795.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 795.42 100.00%
03.17.03 AFORADOR PARSHALL - AZANGARO (01 UND) 1,953.75
03.17.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.17.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.17.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.17.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.17.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.17.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.17.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.17.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.17.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.17.03.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.17.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.17.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.17.03.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.17.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.17.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.17.04 POZA DISIPADORA DE ENERGIA - AZANGARO (05 UND) 7,179.84
03.17.04.01 LIMPIEZA Y DESBROSE MANUAL m2 28.88 0.61 17.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 28.88 17.62 100.00%
03.17.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 12.19 3.85 46.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.19 46.93 100.00%
03.17.04.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 13.66 20.19 275.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.66 275.80 100.00%
03.17.04.04 REFINE, COMPACTACION Y NIVELACION m2 52.89 1.70 89.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 52.89 89.91 100.00%
03.17.04.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 17.07 12.11 206.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.07 206.72 100.00%
03.17.04.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 12.19 19.98 243.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.19 243.56 100.00%
03.17.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 38.56 33.99 1,310.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 38.56 1,310.65 100.00%
03.17.04.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 216.27 6.24 1,349.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 216.27 1,349.52 100.00%
03.17.04.09 CONCRETO f´c=210Kg/cm2 m3 5.38 419.89 2,259.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.38 2,259.01 100.00%
03.17.04.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 36.95 24.03 887.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 36.95 887.91 100.00%
03.17.04.11 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 13.50 36.46 492.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.50 492.21 100.00%
03.17.05 PARTIDOR DE CAUDAL TIPO II - AZANGARO (01 UND) 1,573.02
03.17.05.01 LIMPIEZA Y DESBROSE MANUAL m2 2.25 0.61 1.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.25 1.37 100.00%
03.17.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 3.85 5.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.50 5.78 100.00%
03.17.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.26 20.19 5.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.26 5.25 100.00%
03.17.05.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 0.32 12.11 3.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.32 3.88 100.00%
03.17.05.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 5.54 50.06 277.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.54 277.33 100.00%
03.17.05.06 CONCRETO f´c=175Kg/cm2 m3 0.38 395.69 150.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 150.36 100.00%
03.17.05.07 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 6.00 36.46 218.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 218.76 100.00%
03.17.05.08 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.6 und 3.00 303.43 910.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 910.29 100.00%
03.18 CANAL LATERAL 18 - IRIBAMBA 39,260.66
03.18.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 18 (SUBLATERALES 01 - 18 Y 02 - 18) - IRIBAMBA 25,569.51
03.18.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,229.05 0.61 749.72 1,229.05 749.72 100.00% 0.00 0.00 0.00% 1,229.05 749.72 100.00% 0.00 0.00 0.00%
03.18.01.02 DEMOLICION MANUAL DE CONCRETO m3 15.37 40.38 620.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.37 620.64 100.00%
03.18.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.08 8,069.46 645.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.08 645.56 100.00%
03.18.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 64.95 20.19 1,311.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 64.95 1,311.34 100.00%
03.18.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 23.05 13.46 310.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23.05 310.25 100.00%
03.18.01.06 REFINE, COMPACTACION Y NIVELACION m2 347.70 1.70 591.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 347.70 591.09 100.00%
03.18.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 37.26 33.99 1,266.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 37.26 1,266.47 100.00%
03.18.01.08 CONCRETO f´c=175Kg/cm2 m3 25.95 395.69 10,268.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 25.95 10,268.16 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.18.01.09 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 268.96 36.46 9,806.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 268.96 9,806.28 100.00%
03.18.02 TOMA LATERAL TIPO I CL 18 (SUBLATERALES 01 - 18 Y 02-18) IRIBAMBA - 09 UND. 5,836.10
03.18.02.01 LIMPIEZA Y DESBROSE MANUAL m2 27.00 0.61 16.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.00 16.47 100.00%
03.18.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 17.10 3.85 65.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.10 65.84 100.00%
03.18.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.66 40.38 26.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.66 26.65 100.00%
03.18.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.30 20.19 46.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.30 46.44 100.00%
03.18.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.95 13.46 39.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.95 39.71 100.00%
03.18.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 29.74 50.06 1,488.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 29.74 1,488.78 100.00%
03.18.02.07 CONCRETO f´c=175Kg/cm2 m3 2.34 395.69 925.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.34 925.91 100.00%
03.18.02.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 23.04 36.46 840.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23.04 840.04 100.00%
03.18.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 9.00 265.14 2,386.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.00 2,386.26 100.00%
03.18.03 TOMA LATERAL TIPO II - CANAL SUBLATERAL 02-18 DE IRIBAMBAI (01 UND) 1,166.77
03.18.03.01 LIMPIEZA Y DESBROSE MANUAL m2 4.00 0.61 2.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 2.44 100.00%
03.18.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 3.85 5.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.50 5.78 100.00%
03.18.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 40.38 3.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.09 3.63 100.00%
03.18.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.51 20.19 10.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.51 10.30 100.00%
03.18.03.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 0.65 12.11 7.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.65 7.87 100.00%
03.18.03.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 6.14 50.06 307.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.14 307.37 100.00%
03.18.03.07 CONCRETO f´c=175Kg/cm2 m3 0.52 395.69 205.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.52 205.76 100.00%
03.18.03.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.56 36.46 93.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.56 93.34 100.00%
03.18.03.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 2.00 265.14 530.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 530.28 100.00%
03.18.04 AFORADOR PARSHALL - IRIBAMBA CL-18 (01 UND) 1,953.75
03.18.04.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.18.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.18.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.18.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.18.04.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.18.04.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.18.04.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.18.04.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.18.04.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.18.04.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.18.04.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.18.04.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.18.04.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.18.04.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.18.04.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.18.05 PARTIDOR DE CAUDAL TIPO I - IRIBAMBA (01 UND) 1,040.85
03.18.05.01 LIMPIEZA Y DESBROSE MANUAL m2 2.25 0.61 1.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.25 1.37 100.00%
03.18.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.43 3.85 5.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.43 5.51 100.00%
03.18.05.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 40.38 3.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.09 3.63 100.00%
03.18.05.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.26 20.19 5.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.26 5.25 100.00%
03.18.05.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 0.32 13.46 4.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.32 4.31 100.00%
03.18.05.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 3.30 50.06 165.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.30 165.20 100.00%
03.18.05.07 CONCRETO f´c=175Kg/cm2 m3 0.26 395.69 102.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.26 102.88 100.00%
03.18.05.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 4.00 36.46 145.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 145.84 100.00%
03.18.05.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.6 und 2.00 303.43 606.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 606.86 100.00%
03.18.06 PASE VEHICULAR - IRIBAMBA (01 UND) 3,693.68
03.18.06.01 LIMPIEZA Y DESBROSE MANUAL m2 8.00 0.61 4.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 4.88 100.00%
03.18.06.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 8.00 3.85 30.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 30.80 100.00%
03.18.06.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 5.46 20.19 110.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.46 110.24 100.00%
03.18.06.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 3.15 15.71 49.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.15 49.49 100.00%
03.18.06.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 2.89 12.11 35.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.89 35.00 100.00%
03.18.06.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 3.96 297.98 1,180.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.96 1,180.00 100.00%
03.18.06.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 11.60 33.99 394.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.60 394.28 100.00%
03.18.06.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 162.51 6.24 1,014.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 162.51 1,014.06 100.00%
03.18.06.09 CONCRETO f´c=210Kg/cm2 m3 1.88 419.89 789.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.88 789.39 100.00%
03.18.06.10 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 4.40 13.52 59.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.40 59.49 100.00%
03.18.06.11 PINTURA LATEX 02 MANOS EN MUROS EXTERIORES m2 4.40 5.92 26.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.40 26.05 100.00%
03.19 CANAL LATERAL 19 - IRIBAMBA 117,045.83
03.19.01 MEJORAMIENTO DEL CANAL LATERAL 19 (SUBLATERALES 02 - 19, 01 - 19, 01-01 - 19 y 02-01 - 19) - IRIBAMB 82,012.04
03.19.01.01 LIMPIEZA Y DESBROSE MANUAL m2 3,686.00 0.61 2,248.46 3,686.00 2,248.46 100.00% 0.00 0.00 0.00% 3,686.00 2,248.46 100.00% 0.00 0.00 0.00%
03.19.01.02 DEMOLICION MANUAL DE CONCRETO m3 107.48 40.38 4,340.04 107.48 4,340.04 100.00% 0.00 0.00 0.00% 107.48 4,340.04 100.00% 0.00 0.00 0.00%
03.19.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.10 8,069.46 806.95 0.10 806.95 100.00% 0.00 0.00 0.00% 0.10 806.95 100.00% 0.00 0.00 0.00%
03.19.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 161.22 13.46 2,170.02 161.22 2,170.02 100.00% 0.00 0.00 0.00% 161.22 2,170.02 100.00% 0.00 0.00 0.00%
03.19.01.05 REFINE, COMPACTACION Y NIVELACION m2 1,439.15 1.70 2,446.56 1,439.15 2,446.56 100.00% 0.00 0.00 0.00% 1,439.15 2,446.56 100.00% 0.00 0.00 0.00%
03.19.01.06 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 6.00 31.32 187.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 187.92 100.00%
03.19.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 53.75 33.99 1,826.96 53.75 1,826.96 100.00% 0.00 0.00 0.00% 53.75 1,826.96 100.00% 0.00 0.00 0.00%
03.19.01.08 CONCRETO f´c=175Kg/cm2 m3 107.48 395.69 42,528.76 73.57 29,110.91 68.45% 0.00 0.00 0.00% 73.57 29,110.91 68.45% 33.91 13,417.85 31.55%
03.19.01.09 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 698.20 36.46 25,456.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 698.20 25,456.37 100.00%
03.19.02 TOMA LATERAL TIPO I - IRIBAMBA (43 UND) - CL 19 Y SUS SUBLATERALES 27,873.81
03.19.02.01 LIMPIEZA Y DESBROSE MANUAL m2 129.00 0.61 78.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 129.00 78.69 100.00%
03.19.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 81.70 3.85 314.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 81.70 314.55 100.00%
03.19.02.03 DEMOLICION MANUAL DE CONCRETO m3 4.02 40.38 162.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.02 162.33 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.19.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 10.98 20.19 221.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.98 221.69 100.00%
03.19.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 14.21 13.46 191.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.21 191.27 100.00%
03.19.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 141.09 50.06 7,062.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 141.09 7,062.97 100.00%
03.19.02.07 CONCRETO f´c=175Kg/cm2 m3 11.19 395.69 4,427.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.19 4,427.77 100.00%
03.19.02.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 110.08 36.46 4,013.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 110.08 4,013.52 100.00%
03.19.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 43.00 265.14 11,401.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 43.00 11,401.02 100.00%
03.19.03 AFORADOR PARSHALL - IRIBAMBA CL-19 (01 UND) 1,953.75
03.19.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.19.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.19.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.19.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.19.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.19.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.19.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.19.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.19.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.19.03.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.19.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.19.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.19.03.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.19.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.19.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.19.04 PARTIDOR DE CAUDAL TIPO I - CL 19 IRIBAMBA (05 UND) 5,206.23
03.19.04.01 LIMPIEZA Y DESBROSE MANUAL m2 11.25 0.61 6.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.25 6.86 100.00%
03.19.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 7.13 3.85 27.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.13 27.45 100.00%
03.19.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.47 40.38 18.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.47 18.98 100.00%
03.19.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.28 20.19 25.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.28 25.84 100.00%
03.19.04.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 1.65 13.46 22.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.65 22.21 100.00%
03.19.04.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 16.52 50.06 826.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16.52 826.99 100.00%
03.19.04.07 CONCRETO f´c=175Kg/cm2 m3 1.30 395.69 514.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.30 514.40 100.00%
03.19.04.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 20.00 36.46 729.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.00 729.20 100.00%
03.19.04.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.6 und 10.00 303.43 3,034.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 3,034.30 100.00%
03.20 CANAL LATERAL 20 - BADO 13,496.21
03.20.01 MEJORAMIENTO DEL CANAL LATERAL 20 - BADO 5,416.31
03.20.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,740.00 0.61 1,061.40 1,740.00 1,061.40 100.00% 0.00 0.00 0.00% 1,740.00 1,061.40 100.00% 0.00 0.00 0.00%
03.20.01.02 DEMOLICION MANUAL DE CONCRETO m3 5.37 40.38 216.84 5.37 216.84 100.00% 0.00 0.00 0.00% 5.37 216.84 100.00% 0.00 0.00 0.00%
03.20.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.02 8,069.46 161.39 0.02 161.39 100.00% 0.00 0.00 0.00% 0.02 161.39 100.00% 0.00 0.00 0.00%
03.20.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 8.05 13.46 108.35 8.05 108.35 100.00% 0.00 0.00 0.00% 8.05 108.35 100.00% 0.00 0.00 0.00%
03.20.01.05 REFINE, COMPACTACION Y NIVELACION m2 70.10 1.70 119.17 70.10 119.17 100.00% 0.00 0.00 0.00% 70.10 119.17 100.00% 0.00 0.00 0.00%
03.20.01.06 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 5.60 31.32 175.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.60 175.39 100.00%
03.20.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 5.76 33.99 195.78 5.76 195.78 100.00% 0.00 0.00 0.00% 5.76 195.78 100.00% 0.00 0.00 0.00%
03.20.01.08 CONCRETO f´c=175Kg/cm2 m3 5.37 395.69 2,124.86 5.37 2,124.86 100.00% 0.00 0.00 0.00% 5.37 2,124.86 100.00% 0.00 0.00 0.00%
03.20.01.09 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 34.37 36.46 1,253.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 34.37 1,253.13 100.00%
03.20.02 TOMA LATERAL TIPO I - CANAL LATERAL 20 DE BADO (09 UND) 5,843.64
03.20.02.01 LIMPIEZA Y DESBROSE MANUAL m2 27.00 0.61 16.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.00 16.47 100.00%
03.20.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 17.10 3.85 65.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.10 65.84 100.00%
03.20.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.84 40.38 33.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.84 33.92 100.00%
03.20.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.30 20.19 46.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.30 46.44 100.00%
03.20.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.97 13.46 39.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.97 39.98 100.00%
03.20.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 29.74 50.06 1,488.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 29.74 1,488.78 100.00%
03.20.02.07 CONCRETO f´c=175Kg/cm2 m3 2.34 395.69 925.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.34 925.91 100.00%
03.20.02.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 23.04 36.46 840.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23.04 840.04 100.00%
03.20.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 9.00 265.14 2,386.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.00 2,386.26 100.00%
03.20.03 AFORADOR PARSHALL - BADO CL-20 (01 UND) 1,953.75
03.20.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.20.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.20.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.20.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.20.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.20.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.20.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.20.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.20.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.20.03.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.20.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.20.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.20.03.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.20.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.20.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.20.04 REHABILITACION DE POZA DISIPADORA DE ENERGIA - BADO (02 UND) 282.51
03.20.04.01 LIMPIEZA Y DESBROSE MANUAL m2 11.55 0.61 7.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.55 7.05 100.00%
03.20.04.02 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 0.71 10.09 7.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.71 7.16 100.00%
03.20.04.03 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 2.50 72.87 182.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.50 182.18 100.00%
03.20.04.04 SELLADO DE GRIETAS Y FISURAS ep=2cm m 2.00 43.06 86.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 86.12 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.21 CANAL LATERAL 21 - BADO 34,358.56
03.21.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 21 (SUBLATERALES 01 - 21 y 02 - 21) - BADO 27,264.69
03.21.01.01 LIMPIEZA Y DESBROSE MANUAL m2 928.05 0.61 566.11 928.05 566.11 100.00% 0.00 0.00 0.00% 928.05 566.11 100.00% 0.00 0.00 0.00%
03.21.01.02 DEMOLICION MANUAL DE CONCRETO m3 11.52 40.38 465.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.52 465.18 100.00%
03.21.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.08 8,069.46 645.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.08 645.56 100.00%
03.21.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 121.58 20.19 2,454.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 121.58 2,454.70 100.00%
03.21.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 17.28 13.46 232.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.28 232.59 100.00%
03.21.01.06 REFINE, COMPACTACION Y NIVELACION m2 404.03 1.70 686.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 404.03 686.85 100.00%
03.21.01.07 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 50.32 31.32 1,576.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 50.32 1,576.02 100.00%
03.21.01.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 33.65 33.99 1,143.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 33.65 1,143.76 100.00%
03.21.01.09 CONCRETO f´c=175Kg/cm2 m3 30.92 395.69 12,234.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.92 12,234.73 100.00%
03.21.01.10 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 199.10 36.46 7,259.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 199.10 7,259.19 100.00%
03.21.02 TOMA LATERAL TIPO I DEL CL 21 (SUBLATERALES 01 - 21 Y 02-21) - BADO 06 UND. 3,895.86
03.21.02.01 LIMPIEZA Y DESBROSE MANUAL m2 18.00 0.61 10.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.00 10.98 100.00%
03.21.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 11.40 3.85 43.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.40 43.89 100.00%
03.21.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.56 40.38 22.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.56 22.61 100.00%
03.21.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.53 20.19 30.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.53 30.89 100.00%
03.21.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 1.98 13.46 26.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.98 26.65 100.00%
03.21.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 19.83 50.06 992.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 19.83 992.69 100.00%
03.21.02.07 CONCRETO f´c=175Kg/cm2 m3 1.56 395.69 617.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.56 617.28 100.00%
03.21.02.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 15.36 36.46 560.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.36 560.03 100.00%
03.21.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE und 6.00 265.14 1,590.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 1,590.84 100.00%
03.21.03 AFORADOR PARSHALL - BADO CL-21 (01 UND) 1,953.75
03.21.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.21.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.21.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.21.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.21.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.21.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.21.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.21.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.21.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.21.03.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.21.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.21.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
03.21.03.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.21.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.21.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.21.04 PARTIDOR DE CAUDAL TIPO I - CL 21 BADO (01 UND) 1,040.85
03.21.04.01 LIMPIEZA Y DESBROSE MANUAL m2 2.25 0.61 1.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.25 1.37 100.00%
03.21.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.43 3.85 5.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.43 5.51 100.00%
03.21.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 40.38 3.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.09 3.63 100.00%
03.21.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.26 20.19 5.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.26 5.25 100.00%
03.21.04.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 0.32 13.46 4.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.32 4.31 100.00%
03.21.04.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 3.30 50.06 165.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.30 165.20 100.00%
03.21.04.07 CONCRETO f´c=175Kg/cm2 m3 0.26 395.69 102.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.26 102.88 100.00%
03.21.04.08 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 4.00 36.46 145.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 145.84 100.00%
03.21.04.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.6 und 2.00 303.43 606.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 606.86 100.00%
03.21.05 REHABILITACION DE POZA DISIPADORA DE ENERGIA - BADO (03 UND) CL-21
03.21.05.01 LIMPIEZA Y DESBROSE MANUAL m2 17.33 0.61 10.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.33 10.57 100.00%
03.21.05.02 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 1.07 10.09 10.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.07 10.80 100.00%
03.21.05.03 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 1.08 72.87 78.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.08 78.70 100.00%
03.21.05.04 SELLADO DE GRIETAS Y FISURAS ep=2cm m 2.40 43.06 103.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.40 103.34 100.00%
03.22 CANAL LATERAL 22 - BADO 15,524.25
03.22.01 CONSTRUCCION DEL CANAL LATERAL 22 - BADO) 12,132.98
03.22.01.01 LIMPIEZA Y DESBROSE MANUAL m2 237.60 0.61 144.94 237.60 144.94 100.00% 0.00 0.00 0.00% 237.60 144.94 100.00% 0.00 0.00 0.00%
03.22.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJE mes 0.05 8,069.46 403.47 0.05 403.47 100.00% 0.00 0.00 0.00% 0.05 403.47 100.00% 0.00 0.00 0.00%
03.22.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 109.57 20.19 2,212.22 109.57 2,212.22 100.00% 0.00 0.00 0.00% 109.57 2,212.22 100.00% 0.00 0.00 0.00%
03.22.01.04 REFINE, COMPACTACION Y NIVELACION m2 190.08 1.70 323.14 190.08 323.14 100.00% 0.00 0.00 0.00% 190.08 323.14 100.00% 0.00 0.00 0.00%
03.22.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.30 33.99 78.18 2.30 78.18 100.00% 0.00 0.00 0.00% 2.30 78.18 100.00% 0.00 0.00 0.00%
03.22.01.06 CONCRETO f´c=175Kg/cm2 m3 14.18 395.69 5,610.88 14.18 5,610.88 100.00% 0.00 0.00 0.00% 14.18 5,610.88 100.00% 0.00 0.00 0.00%
03.22.01.07 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 92.16 36.46 3,360.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 92.16 3,360.15 100.00%
03.22.02 AFORADOR PARSHALL - CL 22 BADO (01 UND) 1,953.75
03.22.02.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.61 8.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.57 8.28 100.00%
03.22.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 3.85 25.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.74 25.95 100.00%
03.22.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 40.38 15.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 15.34 100.00%
03.22.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 20.19 32.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.59 32.10 100.00%
03.22.02.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 1.70 10.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.09 10.35 100.00%
03.22.02.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION m3 2.03 13.46 27.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.03 27.32 100.00%
03.22.02.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 19.98 62.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.12 62.34 100.00%
03.22.02.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 33.99 477.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.05 477.56 100.00%
03.22.02.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.24 188.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.17 188.26 100.00%
03.22.02.10 CONCRETO f´c=210Kg/cm2 m3 0.83 419.89 348.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 348.51 100.00%
03.22.02.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 24.03 167.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.97 167.49 100.00%
03.22.02.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 13.52 24.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.81 24.47 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.22.02.13 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.88 36.46 105.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.88 105.00 100.00%
03.22.02.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 240.39 240.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 240.39 100.00%
03.22.02.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 220.39 220.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 220.39 100.00%
03.22.03 POZA DISIPADORA DE ENERGIA - BADO (01 UND) 1,437.52
03.22.03.01 LIMPIEZA Y DESBROSE MANUAL m2 5.78 0.61 3.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.78 3.53 100.00%
03.22.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 2.44 3.85 9.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.44 9.39 100.00%
03.22.03.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.73 20.19 55.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.73 55.12 100.00%
03.22.03.04 REFINE, COMPACTACION Y NIVELACION m2 10.58 1.70 17.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.58 17.99 100.00%
03.22.03.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 3.41 12.11 41.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.41 41.30 100.00%
03.22.03.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 2.44 19.98 48.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.44 48.75 100.00%
03.22.03.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 7.71 33.99 262.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.71 262.06 100.00%
03.22.03.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 43.25 6.24 269.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 43.25 269.88 100.00%
03.22.03.09 CONCRETO f´c=210Kg/cm2 m3 1.08 419.89 453.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.08 453.48 100.00%
03.22.03.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 7.39 24.03 177.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.39 177.58 100.00%
03.22.03.11 JUNTAS DE DILATACION CON SELLO ELASTOMÉRICO PULEURETA m 2.70 36.46 98.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.70 98.44 100.00%
03.23 PRUEBAS DE LABORATORIO Y DISEÑO DE MEZCLA 6,810.00
03.23.01 ENSAYO DE MECANICA DE SUELOS und 12.00 380.00 4,560.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 4,560.00 100.00%
03.23.02 PRUEBA DE CALIDAD DEL CONCRETO und 50.00 30.00 1,500.00 50.00 1,500.00 100.00% 0.00 0.00 0.00% 50.00 1,500.00 100.00% 0.00 0.00 0.00%
03.23.03 DISEÑO DE MEZCLAS und 3.00 250.00 750.00 3.00 750.00 100.00% 0.00 0.00 0.00% 3.00 750.00 100.00% 0.00 0.00 0.00%
04 FLETE 138,594.98
04.01 FLETE TERRESTRE 75,157.89
04.01.01 FLETE TERRESTRE POR PESO EN CAMION DE CARGA 10TON AYACUC kg 450,000.00 0.08 36,000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 450,000.00 36,000.00 100.00%
04.01.02 FLETE TERRESTRE DE CEMENTO EN CAMION VOLQUETE DE 15M3 H kg 1,281,929.63 0.03 38,457.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,281,929.63 38,457.89 100.00%
04.01.03 FLETE TERRESTRE POR VOLUMEN AYACUCHO - OBRA VJE 1.00 700.00 700.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 700.00 100.00%
04.02 FLETE RURAL 63,437.09
04.02.01 ACARREO DE MATERIALES POR PESO A PIE DE OBRA CON CARRETI kg 14,148.99 0.02 282.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14,148.99 282.98 100.00%
04.02.02 ACARREO DE AGREGADOS A PIE DE OBRA CON CARRETILLA BUGUI m3 670.05 20.37 13,648.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 670.05 13,648.92 100.00%
04.02.03 ACARREO DE CEMENTO A PIE DE OBRA CON CARRETILLA BUGUI - BOL 4,315.86 0.75 3,236.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,315.86 3,236.90 100.00%
04.02.04 ACARREO DE MATERIALES POR PESO A PIE DE OBRA CON CARRET kg 32,520.38 0.03 975.61 2,000.00 60.00 6.15% 0.00 0.00 0.00% 2,000.00 60.00 6.15% 30,520.38 915.61 93.85%
04.02.05 ACARREO DE AGREGADOS A PIE DE OBRA CON CARRETILLA BUGUI m3 1,090.03 33.74 36,777.61 500.00 16,870.00 45.87% 0.00 0.00 0.00% 500.00 16,870.00 45.87% 590.03 19,907.61 54.13%
04.02.06 ACARREO DE CEMENTO A PIE DE OBRA CON CARRETILLA BUGUI BOL 6,866.99 1.24 8,515.07 2,000.00 2,480.00 29.12% 0.00 0.00 0.00% 2,000.00 2,480.00 29.12% 4,866.99 6,035.07 70.88%
05 PLAN DE MANEJO AMBIEMTAL 48,608.02
05.01 MEDIDAS DE MITIGACION Y CONTROL DE LOS IMPACTOS AMBIENTALES 34,665.54
05.01.01 ACONDICIONAMIENTO DE BOTADEROS m3 2,481.17 7.28 18,062.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,481.17 18,062.92 100.00%
05.01.02 CHARLAS EN TEMAS AMBIENTALES AL PERSONAL DE LA OBRA TAL 4.00 486.86 1,947.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 1,947.44 100.00%
05.01.03 IMPLEMENTACIÓN Y ACONDICIONAMIENTO DE CONTENEDORES DE und 10.00 626.15 6,261.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 6,261.50 100.00%
05.01.04 INSTALACION DE LETRINAS SANITARIA und 9.00 621.52 5,593.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.00 5,593.68 100.00%
05.01.05 MONITOREO DE CALIDAD DE AGUA und 4.00 700.00 2,800.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 2,800.00 100.00%
05.02 PLAN DE CONTINGENCIAS 3,703.72
05.02.01 CAPACITACION Y CONFORMACION DE BRIGADAS DE EMERGENCIA TAL 2.00 411.86 823.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 823.72 100.00%
05.02.02 RESPUESTA ANTE EMERGENCIAS mes 8.00 360.00 2,880.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 2,880.00 100.00%
05.03 PARTICIPACION CIUDADANA 5,095.00
05.03.01 CHARLA DE EDUCACION AMBIENTAL A LA POBLACION TAL 5.00 761.86 3,809.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 3,809.30 100.00%
05.03.02 APERTURA E INSTALCION DE BUZON DE SUGERENCIAS und 10.00 128.57 1,285.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 1,285.70 100.00%
05.04 PROGRAMA DE CIERRE Y ABANDONO 5,143.76
05.04.01 RESTAURACION DE AREAS AFECTADAS POR CAMPAMENTO m2 1,000.00 1.31 1,310.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,000.00 1,310.00 100.00%
05.04.02 RESTAURACION DE AREAS AFECTADAS POR PREPARACION DE CON m2 1,500.00 1.96 2,940.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,500.00 2,940.00 100.00%
05.04.03 CIERRE DE CONTENEDORES DE RESIDUOS SOLIDOS Y LETRINAS m2 114.00 7.84 893.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 114.00 893.76 100.00%
06 CAPACITACIONES Y FORTALECIMIENTO ORGANIZACIONAL 67,867.30
06.01 CAPACITACIONES 22,777.30
06.01.01 CAPACITACION EN OPERACIÓN Y MANTENIMIENTO DE LA INFRAE TAL 5.00 614.74 3,073.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 3,073.70 100.00%
06.01.02 ELABORACION DEL PLAN DE DISTRIBUCION DEL AGUA EN EL SIS und 1.00 11,050.00 11,050.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 11,050.00 100.00%
06.01.03 CAPACITACION EN OPERACIÓN DE LAS TOMAS LATERALES, AFORA TAL 5.00 614.74 3,073.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 3,073.70 100.00%
06.01.04 ASISTENCIA TECNICA Y ENTRENAMIENTO EN EL USO DEL AFORAD Visita 5.00 501.24 2,506.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 2,506.20 100.00%
06.01.05 CAPACITACION EN TECNICAS DE RIEGO TAL 5.00 614.74 3,073.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 3,073.70 100.00%
06.02 FORTALECIMIENTO ORGANIZACIONAL DEL COMITÉ Y DE JUNTA DE USUARIOS 25,794.00
06.02.01 CAPACITACION EN MANEJO DE HERRAMIENTAS DE GESTION TAL 2.00 1,160.00 2,320.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 2,320.00 100.00%
06.02.02 CAPACITACION EN LEGISLACION Y NORMATIVIDAD DE AGUA TAL 2.00 1,080.00 2,160.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 2,160.00 100.00%
06.02.03 CAPACITACION EN ORGANIZACIÓN DE REGANTES (DEBERES Y DE TAL 10.00 920.00 9,200.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 9,200.00 100.00%
06.02.04 EQUIPAMIENTO DE LA OFICINA CENTRAL DEL COMITÉ DE RIEGO jgo 1.00 12,114.00 12,114.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 12,114.00 100.00%
06.03 PASANTIA NACIONAL 19,296.00
06.03.01 PASANTIA NACIONAL (PROYECTO ESPECIAL CHAVIMOCHIC) VJE 1.00 19,296.00 19,296.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 19,296.00 100.00%
COSTO DIRECTO 4,054,122.73 293,199.92 7.23% 0.00 0.00% 293,199.92 7.23% 3,760,922.81 92.77%
GASTOS GENERALES 0.13 520,483.86 69,994.43 0.00 69,994.43 450,489.43
SUPERVISIÓN 0.06 240,570.00 29,791.10 0.00 29,791.10 210,778.90
GESTIÓN DEL PROYECTO 265,000.00 32,663.69 0.00 32,663.69 232,336.31
LIQUIDACIÓN 31,590.90 31,590.90
EXPEDIENTE TÉCNICO 180,000.00 180,000.00
PRESUPUESTO TOTAL 5,291,767.49 425,649.14 8.04% 0.00 0.00% 425,649.14 8.04% 4,866,118.35 91.96%
Fuente: Equipo Tecnico 2019.
RESUMEN DE VALORIZACIÓN DEL AVANCE FISICO Nº 03 - 2020 1
mes de MARZO 2020
PROGRAMA REGIONAL DE IRRIGACIÓN Y DESARROLLO RURAL INTEGRADO
COMPONENTE :"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA PARA RIEGO PALLQA - PAMPA WIÑAY, DE LOS DISTRITOS DE SUPERVISOR DE OBRA #REF!
PARAS Y TOTOS, PROVINCIA DE CANGALLO-AYACUCHO”. RESIDENTE DE OBRA : ing. Percy Sulca Carrasco
OBRA/META :"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA PARA RIEGO PALLQA - PAMPA WIÑAY, DE LOS DISTRITOS DE DEPARTAMENTO : AYACUCHO
PARAS Y TOTOS, PROVINCIA DE CANGALLO-AYACUCHO” / 0024. PROVINCIA : CANGALLO
MONTO VALOR REFERENCIAL S/. 8,113,104.64 DISTRITO : PARAS Y TOTOS
ASIGNACIÓN PRESUPUESTAL #REF! LUGAR : PAMPA WIÑAY, SAN ISIDRO, SAN ANTONIO,
EJECUCIÓN PRESUPUESTAL DIRECTA #REF! SAN MARCOS Y NUEVO CANGALLO.
FUENTE FINANCIAMIENTO : RECURSOS ORDINARIOS FECHA DE PRESENTACIÓN #REF!
MES/AÑO #REF!

ACUMULADO ANTERIOR AVANCE EN EL MES AVANCE ACUMULADO TOTAL


PRESUPUESTO SALDO
ITEM D E S C R I P C I Ó N PARTIDA ANTERIOR
%
ACTUAL
%
ACUMULADO
%
%
UND METRADO P.U. PRESUPUESTO METRADO VALORIZACIÓN METRADO VALORIZACIÓN METRADO VALORIZACIÓN METRADO VALORIZACIÓN
01 ADECUADA INFRAESTRUCTURA DE RIEGO 6,885,946.01
01.01 OBRAS PROVISIONALES 24,316.00
01.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 5.0mx3.0m und 1.00 750.00 750.00 1.00 750.00 100.00% 0.00 0.00% 1.00 750.00 100.00% 0.00 0.00 0.00%
01.01.02 CAMPAMENTO TRIPLAY Y TECHO CALAMINA m2 40.00 70.95 2,838.00 40.00 2,838.00 100.00% 0.00 0.00% 40.00 2,838.00 100.00% 0.00 0.00 0.00%
01.01.03 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS Y EQUIPO glb 1.00 20,728.00 20,728.00 1.00 20,728.00 100.00% 0.00 0.00% 1.00 20,728.00 100.00% 0.00 0.00 0.00%
01.02 CONSTRUCCION DE BOCATOMA (02 UND) 184,377.97
01.02.01 CAPTACION LATERAL DIRECTA - RIO TUCUMAYO 95,202.83
01.02.01.01 DESVIO DE RIACHUELO m 4.73 70.82 334.98 4.73 334.98 100.00% 0.00 0.00% 4.73 334.98 100.00% 0.00 0.00 0.00%
01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 189.20 4.75 898.70 189.20 898.70 100.00% 0.00 0.00% 189.20 898.70 100.00% 0.00 0.00 0.00%
01.02.01.03 EXCAVACION CON MAQUINARIA m3 144.00 17.56 2,528.64 66.00 1,158.96 45.83% 0.00 0.00% 66.00 1,158.96 45.83% 78.00 1,369.68 54.17%
01.02.01.04 ENCOFRADO Y DESENCOFRADO m2 328.00 71.04 23,301.12 328.00 23,301.12 100.00% 0.00 0.00% 328.00 23,301.12 100.00% 0.00 0.00 0.00%
01.02.01.05 CONCRETO f'c=140 kg/cm2+30%PM m3 89.87 289.76 26,040.73 43.50 12,604.56 48.40% 0.00 0.00% 43.50 12,604.56 48.40% 46.37 13,436.17 51.60%
01.02.01.06 CONCRETO f'c=175 kg/cm2 m3 94.20 441.46 41,585.53 33.15 14,634.40 35.19% 0.00 0.00% 33.15 14,634.40 35.19% 61.05 26,951.13 64.81%
01.02.01.07 COMPUERTA METALICA und 1.00 513.13 513.13 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 513.13 100.00%
01.02.02 BOCATOMA - RIO CHALANA 89,175.14
01.02.02.01 DESVIO DE RIACHUELO m 10.71 70.82 758.48 10.71 758.48 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.02.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 150.05 4.75 712.74 117.80 559.55 78.51% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.02.02.03 EXCAVACION CON MAQUINARIA m3 178.26 17.56 3,130.25 99.25 1,742.83 55.68% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.02.02.04 ENCOFRADO Y DESENCOFRADO m2 289.08 71.04 20,536.24 239.65 17,024.74 82.90% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.02.02.05 CONCRETO f'c=140 kg/cm2+30%PM m3 51.91 289.76 15,041.44 27.26 7,898.86 52.51% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.02.02.06 CONCRETO f'c=175 kg/cm2 m3 108.99 441.46 48,114.73 8.78 3,876.02 8.06% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.02.02.07 COMPUERTA METALICA und 1.00 513.13 513.13 1.00 513.13 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.02.02.08 REJILLA METALICA und 1.00 368.13 368.13 0.00 0.00 0.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.03 GAVIONES (L=80m, L=265m, L=150m) 908,358.44 #REF! #REF! #REF!
01.03.01 LIMPIEZA DEL TERRENO MANUAL m2 1,980.00 1.47 2,910.60 800.00 1,176.00 40.40% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.03.02 TRAZO Y REPLANTEO PRELIMINAR m2 1,980.00 4.75 9,405.00 800.00 3,800.00 40.40% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.03.03 EXCAVACION C/ MAQUINARIA EN EL LECHO DEL RIACHUELO m3 3,922.50 17.56 68,879.10 1,918.00 33,680.08 48.90% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.03.04 EXCAVACION EN ROCA FIJA m3 600.00 55.54 33,324.00 600.00 33,324.00 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.03.05 RELLENO CON MATERIAL PROPIO m3 742.50 3.09 2,294.33 300.00 927.00 40.40% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.03.06 ACARREO DE PIEDRAS PARA RELLENO m3 1,980.00 20.58 40,748.40 1,405.00 28,914.90 70.96% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.03.07 GAVION HEXAGONAL TIPO CAJA (5mx1mx1m) m3 445.50 329.22 146,667.51 445.50 146,667.51 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.03.08 GAVION HEXAGONAL TIPO COLCHON (5mx2mx0.3m) m3 1,725.00 350.22 604,129.50 300.00 105,066.00 17.39% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.04 CONSTRUCCION DE DESARENADOR (02 UND) 11,975.07 #REF! #REF! #REF!
01.04.01 TRAZO Y REPLANTEO PRELIMINAR m2 14.99 4.75 71.20 14.99 71.20 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.04.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 58.20 61.74 3,593.27 58.20 3,593.27 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.04.03 CONCRETO f'c=100 kg/cm2 PARA SOLADOS m3 0.87 401.89 349.64 0.87 349.64 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.04.04 CONCRETO f'c=175 kg/cm2 m3 4.85 441.46 2,141.08 4.85 2,141.08 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.04.05 ENCOFRADO Y DESENCOFRADO m2 27.52 71.04 1,955.02 27.52 1,955.02 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.04.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 250.91 5.04 1,264.59 250.91 1,264.59 100.00% #REF! #REF! #REF! #REF! #REF! #REF! 0.00 0.00 0.00%
01.04.07 TARRAJEO Y SOLAQUEO DE ESTRUCTURA m2 23.82 33.51 798.21 23.82 798.21 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.04.08 COMPUERTA METALICA DESARENADOR und 2.00 532.90 1,065.80 2.00 1,065.80 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.04.09 REJILLA METALICA DESARENADOR und 2.00 368.13 736.26 2.00 736.26 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05 LINEA DE CONDUCCION PRINCIPAL 4,607,341.30
01.05.01 LINEA DE CONDUCCION CON TUB. PVC (L=20.3Km) 4,529,008.17
01.05.01.01 LIMPIEZA DEL TERRENO MANUAL m2 9,108.00 1.47 13,388.76 9,108.00 13,388.76 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
RESUMEN DE VALORIZACIÓN DEL AVANCE FISICO Nº 03 - 2020 1
mes de MARZO 2020
PROGRAMA REGIONAL DE IRRIGACIÓN Y DESARROLLO RURAL INTEGRADO
COMPONENTE :"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA PARA RIEGO PALLQA - PAMPA WIÑAY, DE LOS DISTRITOS DE SUPERVISOR DE OBRA #REF!
PARAS Y TOTOS, PROVINCIA DE CANGALLO-AYACUCHO”. RESIDENTE DE OBRA : ing. Percy Sulca Carrasco
OBRA/META :"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA PARA RIEGO PALLQA - PAMPA WIÑAY, DE LOS DISTRITOS DE DEPARTAMENTO : AYACUCHO
PARAS Y TOTOS, PROVINCIA DE CANGALLO-AYACUCHO” / 0024. PROVINCIA : CANGALLO
MONTO VALOR REFERENCIAL S/. 8,113,104.64 DISTRITO : PARAS Y TOTOS
ASIGNACIÓN PRESUPUESTAL #REF! LUGAR : PAMPA WIÑAY, SAN ISIDRO, SAN ANTONIO,
EJECUCIÓN PRESUPUESTAL DIRECTA #REF! SAN MARCOS Y NUEVO CANGALLO.
FUENTE FINANCIAMIENTO : RECURSOS ORDINARIOS FECHA DE PRESENTACIÓN #REF!
MES/AÑO #REF!

ACUMULADO ANTERIOR AVANCE EN EL MES AVANCE ACUMULADO TOTAL


PRESUPUESTO SALDO
ITEM D E S C R I P C I Ó N PARTIDA ANTERIOR
%
ACTUAL
%
ACUMULADO
%
%
UND METRADO P.U. PRESUPUESTO METRADO VALORIZACIÓN METRADO VALORIZACIÓN METRADO VALORIZACIÓN METRADO VALORIZACIÓN
01.05.01.02 TRAZO, NIVELACION Y REPLANTEO EN CANAL km 20.34 1,556.03 31,649.65 20.34 31,649.65 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.01.03 EXCAVACION DE ZANJA, MATERIAL SUELTO m3 44,702.92 20.58 919,986.09 13,287.97 273,466.32 29.73% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.01.04 EXCAVACION EN ROCA SUELTA m3 4,270.98 24.70 105,493.21 3,902.98 96,403.61 91.38% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.01.05 EXCAVACION DE ZANJA, EN ROCA FIJA m3 2,115.15 96.23 203,540.88 871.58 83,872.14 41.21% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.01.06 REFINE, PERFILADO Y NIVELACION ZANJA m2 56,946.40 1.22 69,474.61 26,786.00 32,678.92 47.04% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.01.07 COLOCACION DE CAMA DE APOYO e=10 cm m 20,338.00 0.94 19,117.72 9,237.00 8,682.78 45.42% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.01.08 RELLENO CON MATERIAL PROPIO m3 10,575.76 3.09 32,679.10 3,075.26 9,502.55 29.08% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.01.09 TUBERIA PVC NTP ISO 1452, UF C-5. D=200mm m 680.00 45.79 31,137.20 680.00 31,137.20 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.01.10 TUBERIA PVC-U NTP ISO 1452, D=355mm C-5 m 14,500.00 190.69 2,765,005.00 7,487.00 1,427,696.03 51.63% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.01.11 TUBERIA PVC-U NTP ISO 1452, D=250mm C-5 m 5,158.00 45.79 236,184.82 0.00 0.00 0.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.01.12 SUMNISTRO E INSTALACION DE ACCESORIOS PVC und 1.00 81,013.13 81,013.13 0.76 61,407.95 75.80% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.01.13 PRUEBA HIDRAULICA DE TUBERIA m 20,338.00 1.00 20,338.00 3,300.00 3,300.00 16.23% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.02 CANAL ACUEDUCTO SUBTERRANEO (L=131m) 78,333.13
01.05.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 131.00 4.75 622.25 130.00 617.50 99.24% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.02.02 DESVIO DE RIACHUELO m 60.00 70.82 4,249.20 48.00 3,399.36 80.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.02.03 EXCAVACION C/ MAQUINARIA EN EL LECHO DEL RIACHUELO m3 340.60 17.56 5,980.94 119.60 2,100.18 35.11% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.02.04 RELLENO CON MATERIAL PROPIO m3 35.37 3.09 109.29 24.84 76.76 70.23% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.02.05 CONCRETO f'c=100 kg/cm2 PARA SOLADOS m3 11.79 401.89 4,738.28 4.41 1,772.33 37.40% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.02.06 CONCRETO f'c=210 kg/cm2 m3 57.64 453.98 26,167.41 15.66 7,109.33 27.17% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.02.07 ENCOFRADO Y DESENCOFRADO m2 170.30 71.04 12,098.11 35.28 2,506.29 20.72% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.05.02.08 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 4,834.85 5.04 24,367.64 679.95 3,426.95 14.06% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06 OBRAS DE ARTE 325,390.43
01.06.01 TOMA LATERAL C/ LIMPIA (59 UND) 299,202.01
01.06.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 217.71 4.75 1,034.12 47.97 227.86 22.03% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.01.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 240.72 61.74 14,862.05 53.04 3,274.69 22.03% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.01.03 CONCRETO f'c=100 kg/cm2 PARA SOLADOS m3 10.62 401.89 4,268.07 2.34 940.42 22.03% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.01.04 CONCRETO f'c=210 kg/cm2 m3 162.25 453.98 73,658.26 35.75 16,229.79 22.03% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.01.05 ENCOFRADO Y DESENCOFRADO m2 617.14 71.04 43,841.63 219.66 15,604.65 35.59% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.01.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 3,471.18 5.04 17,494.75 764.84 3,854.79 22.03% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.01.07 TARRAJEO INTERIOR Y SOLAQUEO m2 525.10 33.51 17,596.10 115.70 3,877.11 22.03% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.01.08 TAPAS METALICAS ESTRIADO und 59.00 812.78 47,954.02 13.00 10,566.14 22.03% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.01.09 ACCESORIOS Y VALVULAS D=110mm UF und 59.00 1,330.39 78,493.01 13.00 17,295.07 22.03% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.02 CAMARA DE CARGA Y DESCARGA SIFON (08 UND) 15,849.86
01.06.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 13.20 4.75 62.70 13.20 62.70 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.02.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 14.56 61.74 898.93 14.56 898.93 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.02.03 CONCRETO f'c=100 kg/cm2 PARA SOLADOS m3 0.60 401.89 241.13 0.60 241.13 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.02.04 CONCRETO f'c=210 kg/cm2 m3 12.56 453.98 5,701.99 10.52 4,775.87 83.76% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.02.05 ENCOFRADO Y DESENCOFRADO m2 39.24 71.04 2,787.61 39.24 2,787.61 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.02.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 510.29 5.04 2,571.86 363.50 1,832.05 71.23% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.02.07 TARRAJEO INTERIOR Y SOLAQUEO m2 19.20 33.51 643.39 19.20 643.39 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.02.08 TAPA METALICA EN CAMARA und 8.00 367.78 2,942.24 8.00 2,942.24 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.03 CAMARA DE PURGA SIFON (04 UND) 10,338.56
01.06.03.01 TRAZO Y REPLANTEO PRELIMINAR m2 9.00 4.75 42.75 8.19 38.90 91.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.03.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 12.16 61.74 750.76 8.02 495.15 65.95% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.03.03 CONCRETO f'c=100 kg/cm2 PARA SOLADOS m3 0.32 401.89 128.60 0.26 104.49 81.25% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
RESUMEN DE VALORIZACIÓN DEL AVANCE FISICO Nº 03 - 2020 1
mes de MARZO 2020
PROGRAMA REGIONAL DE IRRIGACIÓN Y DESARROLLO RURAL INTEGRADO
COMPONENTE :"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA PARA RIEGO PALLQA - PAMPA WIÑAY, DE LOS DISTRITOS DE SUPERVISOR DE OBRA #REF!
PARAS Y TOTOS, PROVINCIA DE CANGALLO-AYACUCHO”. RESIDENTE DE OBRA : ing. Percy Sulca Carrasco
OBRA/META :"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA PARA RIEGO PALLQA - PAMPA WIÑAY, DE LOS DISTRITOS DE DEPARTAMENTO : AYACUCHO
PARAS Y TOTOS, PROVINCIA DE CANGALLO-AYACUCHO” / 0024. PROVINCIA : CANGALLO
MONTO VALOR REFERENCIAL S/. 8,113,104.64 DISTRITO : PARAS Y TOTOS
ASIGNACIÓN PRESUPUESTAL #REF! LUGAR : PAMPA WIÑAY, SAN ISIDRO, SAN ANTONIO,
EJECUCIÓN PRESUPUESTAL DIRECTA #REF! SAN MARCOS Y NUEVO CANGALLO.
FUENTE FINANCIAMIENTO : RECURSOS ORDINARIOS FECHA DE PRESENTACIÓN #REF!
MES/AÑO #REF!

ACUMULADO ANTERIOR AVANCE EN EL MES AVANCE ACUMULADO TOTAL


PRESUPUESTO SALDO
ITEM D E S C R I P C I Ó N PARTIDA ANTERIOR
%
ACTUAL
%
ACUMULADO
%
%
UND METRADO P.U. PRESUPUESTO METRADO VALORIZACIÓN METRADO VALORIZACIÓN METRADO VALORIZACIÓN METRADO VALORIZACIÓN
01.06.03.04 CONCRETO f'c=210 kg/cm2 m3 4.32 453.98 1,961.19 3.91 1,775.06 90.51% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.03.05 ENCOFRADO Y DESENCOFRADO m2 23.64 71.04 1,679.39 21.70 1,541.57 91.79% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.03.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 193.26 5.04 974.03 131.12 660.82 67.84% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.03.07 TAPA METALICA CAMARA PURGA und 4.00 312.78 1,251.12 4.00 1,251.12 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.06.03.08 ACCESORIOS PARA VALVULA DE PURGA und 4.00 887.68 3,550.72 4.00 3,550.72 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.07 CONSTRUCCION DE CANAL CRUCE AEREO (06 UND) 46,627.57
01.07.01 CRUCE AEREO L=9m (01 UND) 3,265.87
01.07.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 6.28 4.75 29.83 6.28 29.83 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.07.01.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 3.00 61.74 185.22 3.00 185.22 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.07.01.03 CONCRETO f'c=175 kg/cm2 m3 1.37 441.46 604.80 1.37 604.80 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.07.01.04 CONCRETO f'c=210 kg/cm2 m3 1.57 453.98 712.75 1.57 712.75 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.07.01.05 ENCOFRADO Y DESENCOFRADO m2 15.15 71.04 1,076.26 14.12 1,003.08 93.20% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.07.01.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 130.36 5.04 657.01 130.36 657.01 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.07.02 CRUCE AEREO L=12m (02 UND) 8,103.37
01.07.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 16.80 4.75 79.80 16.80 79.80 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.07.02.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 2.40 61.74 148.18 2.40 148.18 100.00% 0.00 0.00 0.00% 2.40 148.18 100.00% 0.00 0.00 0.00%
01.07.02.03 CONCRETO f'c=175 kg/cm2 m3 2.86 441.46 1,262.58 2.86 1,262.58 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.07.02.04 CONCRETO f'c=210 kg/cm2 m3 4.18 453.98 1,897.64 4.18 1,897.64 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.07.02.05 ENCOFRADO Y DESENCOFRADO m2 39.60 71.04 2,813.18 39.60 2,813.18 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.07.02.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 377.38 5.04 1,902.00 377.38 1,901.98 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
01.07.03 CRUCE AEREO L=18m (02 UND) 22,732.78
01.07.03.01 TRAZO Y REPLANTEO PRELIMINAR m2 24.00 4.75 114.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.00 114.00 100.00%
01.07.03.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 21.18 61.74 1,307.65 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 21.18 1,307.65 100.00%
01.07.03.03 CONCRETO f'c=175 kg/cm2 m3 14.64 441.46 6,462.97 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.64 6,462.97 100.00%
01.07.03.04 CONCRETO f'c=210 kg/cm2 m3 12.68 453.98 5,756.47 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.68 5,756.47 100.00%
01.07.03.05 ENCOFRADO Y DESENCOFRADO m2 74.20 71.04 5,271.17 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 74.20 5,271.17 100.00%
01.07.03.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 758.04 5.04 3,820.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 758.04 3,820.52 100.00%
01.07.04 CRUCE AEREO L=20m (01 UND) 12,525.55
01.07.04.01 TRAZO Y REPLANTEO PRELIMINAR m2 13.20 4.75 62.70 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.20 62.70 100.00%
01.07.04.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 10.59 61.74 653.83 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.59 653.83 100.00%
01.07.04.03 CONCRETO f'c=175 kg/cm2 m3 7.40 441.46 3,266.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.40 3,266.80 100.00%
01.07.04.04 CONCRETO f'c=210 kg/cm2 m3 7.04 453.98 3,196.02 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.04 3,196.02 100.00%
01.07.04.05 ENCOFRADO Y DESENCOFRADO m2 43.30 71.04 3,076.03 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 43.30 3,076.03 100.00%
01.07.04.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 450.43 5.04 2,270.17 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 450.43 2,270.17 100.00%
01.08 CONSTRUCCION DE RESERVORIO C°A° (04 UND) 524,339.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.08.01 RESERVORIO DE V=300m3 (03 UND) 321,669.46
01.08.01.01 LIMPIEZA DEL TERRENO MANUAL m2 594.00 1.47 873.18 450.00 661.50 75.76% 0.00 0.00% 450.00 661.50 75.76% 144.00 211.68 24.24%
01.08.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 450.00 4.75 2,137.50 218.75 1,039.06 48.61% 0.00 0.00% 218.75 1,039.06 48.61% 231.25 1,098.44 51.39%
01.08.01.03 CORTE DE PLATAFORMA MANUAL m3 269.25 45.32 12,202.41 269.25 12,202.41 100.00% 0.00 0.00% 269.25 12,202.41 100.00% 0.00 0.00 0.00%
01.08.01.04 EXCAVACION MANUAL VOLUMEN RESERVORIO m3 450.00 41.16 18,522.00 398.63 16,407.61 88.58% 0.00 0.00% 398.63 16,407.61 88.58% 51.37 2,114.39 11.42%
01.08.01.05 ELIMINACION DE MATERIAL EXCEDENTE m3 899.07 24.08 21,649.61 899.07 21,649.61 100.00% 0.00 0.00% 899.07 21,649.61 100.00% 0.00 0.00 0.00%
01.08.01.06 PERFILADO Y COMPACTADO DEL RESERVORIO m2 481.41 32.51 15,650.64 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 481.41 15,650.64 100.00%
01.08.01.07 CONCRETO f'c=100 kg/cm2 PARA SOLADOS m3 16.68 401.89 6,703.53 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.68 6,703.53 100.00%
01.08.01.08 CONCRETO f'c=140 kg/cm2+30%PM m3 44.43 289.76 12,874.04 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 44.43 12,874.04 100.00%
01.08.01.09 CONCRETO f'c=210 kg/cm2 m3 186.66 453.98 84,739.91 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 186.66 84,739.91 100.00%
RESUMEN DE VALORIZACIÓN DEL AVANCE FISICO Nº 03 - 2020 1
mes de MARZO 2020
PROGRAMA REGIONAL DE IRRIGACIÓN Y DESARROLLO RURAL INTEGRADO
COMPONENTE :"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA PARA RIEGO PALLQA - PAMPA WIÑAY, DE LOS DISTRITOS DE SUPERVISOR DE OBRA #REF!
PARAS Y TOTOS, PROVINCIA DE CANGALLO-AYACUCHO”. RESIDENTE DE OBRA : ing. Percy Sulca Carrasco
OBRA/META :"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA PARA RIEGO PALLQA - PAMPA WIÑAY, DE LOS DISTRITOS DE DEPARTAMENTO : AYACUCHO
PARAS Y TOTOS, PROVINCIA DE CANGALLO-AYACUCHO” / 0024. PROVINCIA : CANGALLO
MONTO VALOR REFERENCIAL S/. 8,113,104.64 DISTRITO : PARAS Y TOTOS
ASIGNACIÓN PRESUPUESTAL #REF! LUGAR : PAMPA WIÑAY, SAN ISIDRO, SAN ANTONIO,
EJECUCIÓN PRESUPUESTAL DIRECTA #REF! SAN MARCOS Y NUEVO CANGALLO.
FUENTE FINANCIAMIENTO : RECURSOS ORDINARIOS FECHA DE PRESENTACIÓN #REF!
MES/AÑO #REF!

ACUMULADO ANTERIOR AVANCE EN EL MES AVANCE ACUMULADO TOTAL


PRESUPUESTO SALDO
ITEM D E S C R I P C I Ó N PARTIDA ANTERIOR
%
ACTUAL
%
ACUMULADO
%
%
UND METRADO P.U. PRESUPUESTO METRADO VALORIZACIÓN METRADO VALORIZACIÓN METRADO VALORIZACIÓN METRADO VALORIZACIÓN
01.08.01.10 ENCOFRADO Y DESENCOFRADO m2 576.84 71.04 40,978.71 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 576.84 40,978.71 100.00%
01.08.01.11 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 14,628.08 5.04 73,725.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14,628.08 73,725.52 100.00%
01.08.01.12 TARRAJEO Y SOLAQUEO DE ESTRUCTURA m2 724.68 33.51 24,284.03 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 724.68 24,284.03 100.00%
01.08.01.13 JUNTA WATER STOP 6" m 91.80 37.52 3,444.34 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 91.80 3,444.34 100.00%
01.08.01.14 JUNTA DE MATERIAL ELASTOMERICO m 91.80 42.31 3,884.06 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 91.80 3,884.06 100.00%
01.08.02 RESERVORIO DE V=400m3 (01 UND) 148,815.97
01.08.02.01 LIMPIEZA DEL TERRENO MANUAL m2 277.50 1.47 407.93 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 277.50 407.93 100.00%
01.08.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 208.00 4.75 988.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 208.00 988.00 100.00%
01.08.02.03 CORTE DE PLATAFORMA MANUAL m3 110.75 45.32 5,019.19 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 110.75 5,019.19 100.00%
01.08.02.04 EXCAVACION MANUAL VOLUMEN RESERVORIO m3 200.00 41.16 8,232.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 200.00 8,232.00 100.00%
01.08.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 388.44 24.08 9,353.64 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 388.44 9,353.64 100.00%
01.08.02.06 PERFILADO Y COMPACTADO DEL RESERVORIO m2 135.86 32.51 4,416.81 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 135.86 4,416.81 100.00%
01.08.02.07 CONCRETO f'c=100 kg/cm2 PARA SOLADOS m3 5.56 401.89 2,234.51 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.56 2,234.51 100.00%
01.08.02.08 CONCRETO f'c=140 kg/cm2+30%PM m3 14.81 289.76 4,291.35 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.81 4,291.35 100.00%
01.08.02.09 CONCRETO f'c=210 kg/cm2 m3 62.20 453.98 28,237.56 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 62.20 28,237.56 100.00%
01.08.02.10 ENCOFRADO Y DESENCOFRADO m2 192.28 71.04 13,659.57 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 192.28 13,659.57 100.00%
01.08.02.11 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 12,190.07 5.04 61,437.95 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12,190.07 61,437.95 100.00%
01.08.02.12 TARRAJEO Y SOLAQUEO DE ESTRUCTURA m2 241.56 33.51 8,094.68 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 241.56 8,094.68 100.00%
01.08.02.13 JUNTA WATER STOP 6" m 30.60 37.52 1,148.11 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 30.60 1,148.11 100.00%
01.08.02.14 JUNTA DE MATERIAL ELASTOMERICO m 30.60 42.31 1,294.69 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 30.60 1,294.69 100.00%
01.08.03 CAMARA DE INGRESO (04 UND) 4,263.25
01.08.03.01 TRAZO Y REPLANTEO PRELIMINAR m2 8.12 4.75 38.57 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.12 38.57 100.00%
01.08.03.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 8.12 61.74 501.33 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.12 501.33 100.00%
01.08.03.03 CONCRETO f'c=210 kg/cm2 m3 5.76 453.98 2,614.97 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.76 2,614.92 100.00%
01.08.03.04 ENCOFRADO Y DESENCOFRADO m2 6.44 71.04 457.50 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.44 457.50 100.00%
01.08.03.05 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 98.56 5.04 496.74 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.56 496.74 100.00%
01.08.03.06 TARRAJEO INTERIOR Y SOLAQUEO m2 4.60 33.51 154.15 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.60 154.15 100.00%
01.08.04 CAMARA DE SALIDA Y PURGA (04 UND) 25,617.51
01.08.04.01 TRAZO Y REPLANTEO PRELIMINAR m2 16.24 4.75 77.14 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.24 77.14 100.00%
01.08.04.02 EXCAVACION DE ZANJA EN MATERIAL SUELTO m3 16.00 45.74 731.84 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.00 731.84 100.00%
01.08.04.03 EXCAVACION MANUAL PARA ESTRUCTURA m3 16.24 61.74 1,002.66 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.24 1,002.66 100.00%
01.08.04.04 CONCRETO f'c=100 kg/cm2 PARA SOLADOS m3 0.80 401.89 321.51 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.80 321.51 100.00%
01.08.04.05 CONCRETO f'c=210 kg/cm2 m3 8.00 453.98 3,631.84 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 3,631.84 100.00%
01.08.04.06 ENCOFRADO Y DESENCOFRADO m2 11.56 71.04 821.22 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.56 821.22 100.00%
01.08.04.07 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 281.40 5.04 1,418.26 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 281.40 1,418.26 100.00%
01.08.04.08 TUBERIAS Y ACCESORIOS und 4.00 3,402.90 13,611.60 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 13,611.60 100.00%
01.08.04.09 TAPA METALICA Y REJILLA und 4.00 1,000.36 4,001.44 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 4,001.44 100.00%
01.08.05 CERCO PERIMETRICO (L=135.4m) 23,973.34
01.08.05.01 TRAZO Y REPLANTEO PRELIMINAR m2 1,896.00 4.75 9,006.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,896.00 9,006.00 100.00%
01.08.05.02 EXCAVACION MANUAL PARA ESTRUCTURA m3 8.44 61.74 521.09 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.44 521.09 100.00%
01.08.05.03 CONCRETO f'c=140 kg/cm2 m3 8.44 289.76 2,445.57 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.44 2,445.57 100.00%
01.08.05.04 ALAMBRE DE PUAS Y TUBO NEGRO und 4.00 2,000.17 8,000.68 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 8,000.68 100.00%
01.08.05.05 PUERTA METALICA m2 4.00 1,000.00 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 4,000.00 100.00%
01.09 FLETE TERRESTRE 253,219.71
01.09.01 FLETE TERRESTRE glb 1.00 187,719.71 187,719.71 0.20 37,543.94 20.00% 0.00 0.00% 0.20 37,543.94 20.00% 0.80 150,175.77 80.00%
RESUMEN DE VALORIZACIÓN DEL AVANCE FISICO Nº 03 - 2020 1
mes de MARZO 2020
PROGRAMA REGIONAL DE IRRIGACIÓN Y DESARROLLO RURAL INTEGRADO
COMPONENTE :"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA PARA RIEGO PALLQA - PAMPA WIÑAY, DE LOS DISTRITOS DE SUPERVISOR DE OBRA #REF!
PARAS Y TOTOS, PROVINCIA DE CANGALLO-AYACUCHO”. RESIDENTE DE OBRA : ing. Percy Sulca Carrasco
OBRA/META :"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA PARA RIEGO PALLQA - PAMPA WIÑAY, DE LOS DISTRITOS DE DEPARTAMENTO : AYACUCHO
PARAS Y TOTOS, PROVINCIA DE CANGALLO-AYACUCHO” / 0024. PROVINCIA : CANGALLO
MONTO VALOR REFERENCIAL S/. 8,113,104.64 DISTRITO : PARAS Y TOTOS
ASIGNACIÓN PRESUPUESTAL #REF! LUGAR : PAMPA WIÑAY, SAN ISIDRO, SAN ANTONIO,
EJECUCIÓN PRESUPUESTAL DIRECTA #REF! SAN MARCOS Y NUEVO CANGALLO.
FUENTE FINANCIAMIENTO : RECURSOS ORDINARIOS FECHA DE PRESENTACIÓN #REF!
MES/AÑO #REF!

ACUMULADO ANTERIOR AVANCE EN EL MES AVANCE ACUMULADO TOTAL


PRESUPUESTO SALDO
ITEM D E S C R I P C I Ó N PARTIDA ANTERIOR
%
ACTUAL
%
ACUMULADO
%
%
UND METRADO P.U. PRESUPUESTO METRADO VALORIZACIÓN METRADO VALORIZACIÓN METRADO VALORIZACIÓN METRADO VALORIZACIÓN
01.09.02 FLETE RURAL glb 1.00 65,500.00 65,500.00 0.29 19,233.00 29.36% 0.00 0.00% 0.29 19,233.00 29.36% 0.71 46,267.00 70.64%
02 ADECUADA CAPACITACION Y ASISTENCIA TECNICA 125,400.00
02.01 CAPACITACION EN OPERACION Y MANTENIMIENTO mes 6.00 6,500.00 39,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 39,000.00 100.00%
02.02 CAPACITACION EN FORTALECIMIENTO DE USUARIOS mes 6.00 6,400.00 38,400.00 3.00 19,200.00 50.00% 0.00 0.00% 3.00 19,200.00 50.00% 3.00 19,200.00 50.00%
02.03 CAPACITACION EN EL MANEJO DE CULTIVOS und 1.00 25,000.00 25,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 25,000.00 100.00%
02.04 CAPACITACION EN EL MANEJO DE AGUA und 1.00 11,500.00 11,500.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 11,500.00 100.00%
02.05 MITIGACION DEL IMPACTO AMBIENTAL glb 1.00 11,500.00 11,500.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 11,500.00 100.00%
COSTO DIRECTO 7,011,346.01 2,804,052.95 39.99% #REF! #REF! #REF! #REF! #REF! #REF!
GASTOS GENERALES (10.0%) 701,134.60 280,405.29 39.99% #REF! #REF! #REF! #REF! #REF! #REF!
===============================
SUB TOTAL 7,712,480.61
GASTOS DE SUPERVISION Y LIQUIDACION (5.19%) 400,624.03 160,221.87 39.99% #REF! #REF! #REF! #REF! #REF! #REF!
===============================

PRESUPUESTO TOTAL 8,113,104.64 3,244,680.12 39.99% #REF! #REF! #REF! #REF! #REF! #REF!
ANEXO B N° 04
VALORIZACIÓN ADICIONALES Nº 06 - 2019 4
#REF!

PROGRAMA REGIONAL DE IRRIGACIÓN Y DESARROLLO RURAL INTEGRADO

SUPERVISOR DE OBRA #REF!


:"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA PARA RIEGO PALLQA - PAMPA WIÑAY, DE LOS DISTRITOS DE PARAS Y TOTOS,
COMPONENTE
PROVINCIA DE CANGALLO-AYACUCHO”.
RESIDENTE DE OBRA #REF!

DEPARTAMENTO : AYACUCHO
:"AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA PARA RIEGO PALLQA - PAMPA WIÑAY, DE LOS DISTRITOS DE PARAS Y TOTOS,
OBRA/META
PROVINCIA DE CANGALLO-AYACUCHO” / 0024. PROVINCIA : CANGALLO

MONTO VALOR REFERENCIAL #REF! DISTRITO : PARAS Y TOTOS


ASIGNACIÓN PRESUPUESTAL #REF! LUGAR : PAMPA WIÑAY, SAN ISIDRO, SAN
ANTONIO, SAN MARCOS Y NUEVO
EJECUCIÓN PRESUPUESTAL DIRECTA #REF! CANGALLO.
FUENTE FINANCIAMIENTO : RECURSOS ORDINARIOS FECHA DE PRESENTACIÓN #REF!
MES/AÑO #REF!

PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE EN EL MES AVANCE ACUMULADO TOTAL SALDO POR VALORIZAR
ITEM D E S C R I P C I O N UND METRADO
COST. UNIT.
(S/.)
PARCIAL
(S/.)
METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO %
S/. S/. S/. S/.
02.00 MURO
02.01 MURO SECO DE PIEDRA M3 276.33 117.45 32,454.96 276.33 32,454.96 100.00% 0.00 0.00 0.00% 276.33 32,454.96 100.00% 0.00 0.00 0.00%
07.00 CONSTRUCCION DE CAMARA DE INSPECCION
07.01 TRAZO Y REPLANTEO PRELIMINAR M2 36.25 4.75 172.19 36.25 172.19 100.00% 0.00 0.00 0.00% 36.25 172.19 100.00% 0.00 0.00 0.00%
07.02 EXCAVACION PARA ESTRUCTURAS M3 37.13 61.74 2,292.41 37.13 2,292.41 100.00% 0.00 0.00 0.00% 37.13 2,292.41 100.00% 0.00 0.00 0.00%
07.03 CONCRETO F´c=100 kg/cm2 PARA SOLADOS M3 1.57 401.89 630.97 1.57 630.97 100.00% 0.00 0.00 0.00% 1.57 630.97 100.00% 0.00 0.00 0.00%
07.04 CONCRETO f´c=210 kg/cm2 M3 19.00 470.44 8,938.36 19.00 8,938.36 100.00% 0.00 0.00 0.00% 19.00 8,938.36 100.00% 0.00 0.00 0.00%
07.05 ENCOFRADO Y DESENCOFRADO M2 150.90 71.04 10,719.94 150.90 10,719.94 100.00% 0.00 0.00 0.00% 150.90 10,719.94 100.00% 0.00 0.00 0.00%
07.06 ACERO DE REFUERZO F'y=4200 Kg/cm2 Kg 567.89 5.08 2,884.88 567.89 2,884.88 100.00% 0.00 0.00 0.00% 567.89 2,884.88 100.00% 0.00 0.00 0.00%
07.07 TARRAJEO INTERIOR Y SOLAQUEO M2 133.26 33.51 4,465.54 133.26 4,465.54 100.00% 0.00 0.00 0.00% 133.26 4,465.54 100.00% 0.00 0.00 0.00%
07.08 TAPAS DE CONCRETO 0.74mx0.74mx0.06m M3 0.74 470.44 348.13 0.74 348.13 100.00% 0.00 0.00 0.00% 0.74 348.13 100.00% 0.00 0.00 0.00%
15.00 BADEN DE SIFON
15.01 TRAZO Y REPLANTEO PRELIMINAR M2 16.00 4.75 76.00 16.00 76.00 100.00% 0.00 0.00 0.00% 16.00 76.00 100.00% 0.00 0.00 0.00%
15.02 EXCAVACION PARA ESTRUCTURAS M3 21.00 61.74 1,296.54 21.00 1,296.54 100.00% 0.00 0.00 0.00% 21.00 1,296.54 100.00% 0.00 0.00 0.00%
15.03 CONCRETO F´c=100 kg/cm2 PARA ZAPATA M3 1.00 401.89 401.89 1.00 401.89 100.00% 0.00 0.00 0.00% 1.00 401.89 100.00% 0.00 0.00 0.00%
15.04 CONCRETO f´c=175 kg/cm2 M3 13.66 441.46 6,030.34 13.66 6,030.34 100.00% 0.00 0.00 0.00% 13.66 6,030.34 100.00% 0.00 0.00 0.00%
15.05 ENCOFRADO Y DESENCOFRADO M2 20.75 71.04 1,474.08 20.75 1,474.08 100.00% 0.00 0.00 0.00% 20.75 1,474.08 100.00% 0.00 0.00 0.00%

COSTO DIRECTO 287,850.95 287,850.95 4.11% 0.00 0.00% 287,850.95 4.11% 0.00 0.00%
GASTOS GENERALES (10.0%) 28,785.09 28,785.09 4.11% 0.00 0.00% 28,785.09 4.11% 0.00 0.00%
===============================
SUB TOTAL 316,636.04 316,636.04 0.00 316,636.04 0.00
GASTOS DE SUPERVISION Y LIQUIDACION (5.19%) 16,446.08 16,446.08 4.11% 0.00 0.00% 16,446.08 4.11% 0.00 0.00%
===============================

PRESUPUESTO TOTAL 333,082.12 333,082.12 4.11% 0.00 0.00% 333,082.12 4.11% 0.00 0.00%
ANEXO B N° 02
VALORIZACIÓN DEL AVANCE FISICO Nº 01 1
mes de NOVIEMBRE - 2020

PROGRAMA REGIONAL DE IRRIGACIÓ N Y DESARROLLO RURAL INTEGRADO


SUPERVISOR DE OBRA : Ing. Wilfredo Molina Rojas
:MEJORAMIENTO DEL SERVICIO DE AGUA EN EL SISTEMA DE RIEGO CANAL CACHI-HUANTA, DISTRITO DE HUANTA-HUANTA
COMPONENTE AYACUCHO RESIDENTE DE OBRA : Ing. Jean Pierre Ricardo Serpa Santa Cruz
DEPARTAMENTO : AYACUCHO
OBRA/META :MEJORAMIENTO DEL SERVICIO DE AGUA EN EL SISTEMA DE RIEGO CANAL CACHI-HUANTA, DISTRITO DE HUANTA-HUANTA
AYACUCHO PROVINCIA : HUANTA
MONTO VALOR REFERENCIAL S/. 7,843,020.36 DISTRITO : HUANTA
ASIGNACIÓ N PRESUPUESTAL S/. 850,000.00
LUGAR : PACCOSAN, AZANGARO.
EJECUCIÓ N PRESUPUESTAL DIRECTA S/. 850,000.00
FUENTE FINANCIAMIENTO : RECURSOS ORDINARIOS FECHA DE PRESENTACIÓ N : 07 DE DICIEMBRE DEL 2020
MES/AÑ O : NOVIEMBRE 2020

AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO


PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01 TRABAJOS PRELIMINARES Y OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACIÓN DE OBRA DE 3.60 X 4.80 m (Gigantografía) und 2.00 1,129.60 2,259.20 2 2,259.20 100.00% 0.00 0.00% 2 2,259.20 100.00% 0.00 0.00 0.00%
01.02 CAMPAMENTO DE OBRA (6mX4.2m) und 5.00 2,504.13 12,520.65 2.04 5,108.43 40.80% 0.00 0.00% 2.04 5,108.43 40.80% 2.96 7,412.22 59.20%
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS PARA VJE 4.00 700.00 2,800.00 4 2,800.00 100.00% 0.00 0.00% 4 2,800.00 100.00% 0.00 0.00 0.00%
01.04 TALLER DE CAPACITACION EN SEGURIDAD EN OBRA TAL 6.00 388.76 2,332.56 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 2,332.56 100.00%
01.05 CINTA PLASTICA P/SEÑAL DE PELIGRO - LIMITE DE OBRA m 5,000.00 1.25 6,250.00 809 1,011.25 16.18% 0.00 0.00% 809 1,011.25 16.18% 4,191.00 5,238.75 83.82%
01.06 EQUIPOS DE PROTECICON INDIVIDUAL jgo 1.00 24,520.00 24,520.00 1 24,520.00 100.00% 0.00 0.00% 1 24,520.00 100.00% 0.00 0.00 0.00%
01.07 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA LA OBRA (IDA Y V VJE 2.00 900.00 1,800.00 2 1,800.00 100.00% 0.00 0.00% 2 1,800.00 100.00% 0.00 0.00 0.00%
02 MEJORAMIENTO Y REABILITACION EN EL CANAL MATRIZ O PRINCIPAL - CACHI HUANTA
02.01 OBRAS DE MEJORAMIENTO DE LA BOCATOMA EXISTENTE CACHI HUANTA
02.01.01 MEJORAMIENTO DE LA BOCATOMA EXISTENTE CACHI HUANTA
02.01.01.01 LIMPIEZA Y DESBROSE MANUAL m2 3,000.00 0.91 2,730.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3,000.00 2,730.00 100.00%
02.01.01.02 DESVIO PROVISIONAL DEL RIO - CON MAQUINARIA m3 36.60 22.62 827.89 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 36.60 827.89 100.00%
02.01.01.03 DESCOLMATACION Y ACOMODO DE MATERIAL AGUAS ARRIBA DE LA m3 456.00 22.62 10,314.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 456.00 10,314.72 100.00%
02.01.01.04 DESCOLMATACION Y ACOMODO MANUAL DE MATERIAL EN EL COLCHO m3 127.70 48.51 6,194.73 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 127.70 6,194.73 100.00%
02.01.01.05 DEMOLICION DEL DADO DE CONCRETO (0.25X0.45M.) m3 0.04 60.65 2.43 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.04 2.43 99.84%
02.01.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 0.63 40.58 25.57 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.63 25.57 99.98%
02.01.01.07 ACERO FY=4200 KG/CM2, GRADO 60 kg 5.99 6.55 39.23 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.99 39.23 100.01%
02.01.01.08 CONCRETO f´c=210Kg/cm2 m3 0.04 581.72 23.27 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.04 23.27 99.99%
02.01.01.09 DESMONTAJE DE COMPUERTA METALICA (6.30X1.80m.), e=3/8" und 2.00 1,707.58 3,415.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 3,415.16 100.00%
02.01.01.10 DESMONTAJE DE COMPUERTA METALICA (1.50x1.05m.), e=3/8" und 1.00 571.36 571.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 571.36 100.00%
02.01.01.11 DESMONTAJE DE COMPUERTA METALICA (2.0x1.00m.), e=3/8" und 2.00 895.32 1,790.64 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 1,790.64 100.00%
02.01.01.12 SUMINISTRO E INSTALACION DE COMPUERTA METALICA (6.30X1.80m.), Hvas und 2.00 32,237.23 64,474.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 64,474.46 100.00%
02.01.01.13 SUMINISTRO E INSTALACION DE COMPUERTA METALICA (1.50x1.05m.), Hvas und 1.00 6,218.86 6,218.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 6,218.86 100.00%
02.01.01.14 SUMINISTRO E INSTALACION DE COMPUERTA METALICA (2.0x1.00m.), Hvast und 2.00 6,124.33 12,248.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 12,248.66 100.00%
02.01.01.15 DESMONTAJE DE REJILLA METALICA 2.00X0.96m., e=3/8" - espaciado 0.1m. und 4.00 223.63 894.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 894.52 100.00%
02.01.01.16 SUMINISTRO E INSTALACION DE REJILLA METALICA 2.00X0.96, e=3/8" - Es und 4.00 789.84 3,159.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 3,159.36 100.00%
02.01.01.17 PINTURA EPOXICA EN BARANDAS m 52.00 13.77 716.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 52.00 716.04 100.00%
02.01.02 MEJORAMIENTO Y EQUIPAMIENTO DE LA CASETA DE VIGILANCIA EXISTENTE
02.01.02.01 TARRAJEO EN EXTERIORES E INTERIORES - CASETA DE CONTROL m2 96.72 19.19 1,856.06 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 96.72 1,856.06 100.00%
02.01.02.02 TARRAJEO CIELORASO - CASETA DE CONTROL m2 26.67 32.20 858.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 26.67 858.77 100.00%
02.01.02.03 PISO DE CEMENTO PULIDO Y BRUÑADO, S/COLOREAR e=2" m2 26.67 31.26 833.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 26.67 833.70 100.00%
02.01.02.04 PINTURA LATEX 02 MANOS EN MUROS Y CIELORASO m2 123.39 8.87 1,094.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 123.39 1,094.47 100.00%
02.01.02.05 SUMINISTRO E INST. DE VENTANAS 1.25x1.25 (Incluye vidrio) und 2.00 269.47 538.94 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 538.94 100.00%
02.01.02.06 SUMINISTRO E INST. DE VENTANAS 2.45x1.25 (Incluye vidrio) und 1.00 459.47 459.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 459.47 100.00%
02.01.02.07 SUMINISTRO E INST. DE VENTANAS 1.50x1.25 (Incluye vidrio) und 1.00 311.47 311.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 311.47 100.00%
02.01.02.08 MANTENIMIENTO DE LA PUERTA METALICA EXISTENTE (1.20X2.20m.) und 1.00 231.35 231.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 231.35 100.00%
02.01.02.09 KIT DE HERRAMIENTAS Y MATERIALES PARA LA OPERACION DE LA jgo 1.00 5,544.00 5,544.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 5,544.00 100.00%
02.01.02.10 INSTALACION DE BAÑO DE HOYO SECO und 1.00 1,349.86 1,349.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 1,349.86 100.00%
02.01.03 ELECTRIFICACION EN LA BOCATOMA Y CASETA DE VIGILANCIA EXISTENTE
02.01.03.01 INSTALACION DE RED SECUNDARIO DE 10KVA
02.01.03.01.01 LIMPIEZA DE LINEA m 819.11 0.91 745.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 819.11 745.39 100.00%
02.01.03.01.02 TRAZO Y REPLANTEO DE POSTES und 9.00 118.93 1,070.37 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 1,070.37 100.00%
02.01.03.01.03 TRASLADO DE POSTES und 9.00 364.26 3,278.34 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 3,278.34 100.00%
02.01.03.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 5.73 30.32 173.73 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.73 173.73 100.00%
02.01.03.01.05 POSTES DE C.A.C. 12/300/165/345 und 7.00 973.76 6,816.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.00 6,816.32 100.00%
02.01.03.01.06 POSTES DE C.A.C. 13/500/210/405 und 2.00 1,023.76 2,047.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 2,047.52 100.00%
02.01.03.01.07 RETENIDA INCLINADA SIMPLE AISLADA R1 und 6.00 1,080.19 6,481.14 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 6,481.14 100.00%
02.01.03.01.08 PUESTA A TIERRA PAT-SED und 2.00 1,616.99 3,233.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 3,233.98 100.00%
02.01.03.01.09 PUESTA A TIERRA PAT-1 und 3.00 1,134.49 3,403.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 3,403.47 100.00%
02.01.03.01.10 PUESTA A TIERRA PAT-2 und 4.00 955.24 3,820.96 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 3,820.96 100.00%
02.01.03.01.11 ARMADO TIPO SOPORTE EN ALINIAMIENTO 0-5° PS1-0 und 4.00 1,168.52 4,674.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 4,674.08 100.00%
02.01.03.01.12 ARMADO TIPO SOPORTE DE ANGULO 60-90° PA3-0 und 4.00 1,286.39 5,145.56 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 5,145.56 100.00%
02.01.03.01.13 ARMADO TIPO SUBESTACION CON VANO FLOJO SAM und 1.00 14,600.99 14,600.99 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 14,600.99 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
02.01.03.01.14 CABLE AAAC 1 X 35 mm2 m 819.11 8.21 6,724.89 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 819.11 6,724.89 100.00%
02.01.03.01.15 PRUEBA Y PUESTA EN SERVICIO DE LAS LINEAS Y REDES KM 0.82 953.56 781.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.82 781.92 100.00%
02.01.03.01.16 PRUEBA Y PUESTA EN SERVICIO DE LAS SUB ESTACIONES S.E. 1.00 943.02 943.02 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 943.02 100.00%
02.01.03.02 INSTALACIONES ELECTRICAS EN INTERIORES Y EXTERIORES DE BOCATOMA
02.01.03.02.01 SALIDA PARA CENTROS DE LUZ CASETA DE VIGILANCIA pto 4.00 89.46 357.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 357.84 100.00%
02.01.03.02.02 SALIDA PARA LUZ DE ALUMBRADO BOCATOMA pto 6.00 421.24 2,527.44 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 2,527.44 100.00%
02.01.03.02.03 SALIDA PARA INTERRUPTOR SIMPLE pto 2.00 52.31 104.62 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 104.62 100.00%
02.01.03.02.04 SALIDA PARA INTERRUPTOR DOBLE pto 1.00 62.31 62.31 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 62.31 100.00%
02.01.03.02.05 CABLE ELECTRICO NH-80 2 X 2.5 mm2 m 34.56 4.94 170.73 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 34.56 170.73 100.00%
02.01.03.02.06 CABLE ELECTRICO NH-80 2 X 4 mm2 m 42.04 10.71 450.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 42.04 450.25 100.00%
02.01.03.02.07 CABLE ELECTRICO NH-80 2 X 6 mm2 m 333.12 12.29 4,094.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 333.12 4,094.04 100.00%
02.01.03.02.08 TUBERIA PVC SEL 3/4" PARA TOMACORRIENTE m 17.28 4.88 84.33 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.28 84.33 100.00%
02.01.03.02.09 TUBERIA PVC SAP 3/4" PARA ILUMINACION m 21.02 4.88 102.58 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 21.02 102.58 100.00%
02.01.03.02.10 TUBERIA PVC SAP 3/4" PARA ALUMBRADO EXTERIOR m 51.64 7.61 392.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 51.64 392.98 100.00%
02.01.03.02.11 TUBERIA PVC SAP 3/4" PARA MOTOR ELECTRICO m 48.20 8.41 405.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 48.20 405.36 100.00%
02.01.03.02.12 SALIDA PARA TOMACORRIENTE DOBLE C/LINEA DE TIERRA pto 4.00 61.77 247.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 247.08 100.00%
02.01.03.02.13 TABLERO GENERAL Y INTERRUPTORES und 1.00 968.92 968.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 968.92 100.00%
02.01.03.02.14 TABLERO DESTRIBUCION, INTERRUPTORE Y CONTACTORES und 1.00 1,736.51 1,736.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 1,736.51 100.00%
02.01.03.02.15 POZO DE PUESTA TIERRA und 1.00 1,595.20 1,595.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 1,595.20 100.00%
02.01.03.02.16 POSTE DE TUBO CIRCULAR REDONDO DE 6" X 3.5m und 3.00 583.58 1,750.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 1,750.74 100.00%
02.01.03.02.17 INSTALACION DE MOTOR MONOFASICO DE INVERSION DE GIRO C und 1.00 3,149.98 3,149.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 3,149.98 100.00%
02.02 MEJORAMIENTO DEL DESARENADOR EXISTENTE
02.02.01 DESCOLMATACION Y LIMPIEZA DENTRO DEL DESARENADOR m3 14.08 18.19 256.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.08 256.12 100.00%
02.02.02 DESMONTAJE DE COMPUERTA METALICA TIPO IZAJE (1.85x1.40m.), e=1/4" und 2.00 756.22 1,512.44 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 1,512.44 100.00%
02.02.03 DESMONTAJE DE COMPUERTA METALICA TIPO IZAJE (0.80x0.70m.), e=1/4" und 1.00 447.72 447.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 447.72 100.00%
02.02.04 DESMONTAJE DE COMPUERTA METALICA TIPO IZAJE (0.70x0.75m.), e=1/4" und 2.00 447.72 895.44 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 895.44 100.00%
02.02.05 DESMONTAJE DE REJILLA METALICA - DESARENADOR und 1.00 431.05 431.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 431.05 100.00%
02.02.06 SUMINISTRO E INSTALACION DE COMPUERTA METALICA (1.85x1.40m.), Hvastag und 2.00 8,061.54 16,123.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 16,123.08 100.00%
02.02.07 SUMINISTRO E INSTALACION DE COMPUERTA METALICA (0.80x0.70m.), Hvasta und 1.00 3,224.38 3,224.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 3,224.38 100.00%
02.02.08 SUMINISTRO E INSTALACION DE COMPUERTA METALICA (0.70x0.75m.), Hvastag und 2.00 3,109.38 6,218.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 6,218.76 100.00%
02.02.09 SUMINISTRO E INSTALACION DE REJILLA DE PLATINA 1/4"X1"- Espaciad und 1.00 2,139.84 2,139.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 2,139.84 100.00%
02.03 MEJORAMIENTO DEL CANAL PRINCIPAL CACHI HUANTA (42.645 km)
02.03.01 LIMPIEZA Y DESBROSE MANUAL m2 37,505.25 0.91 34,129.78 3,070.00 2,793.70 8.19% 0.00 0.00% 3070 2,793.70 8.19% 34,435.25 31,336.08 91.81%
02.03.02 DESCOLMATACION Y ACOMODO MANUAL DEL MATERIAL DE LA PLATAFO m3 4,345.29 18.19 79,040.83 97.75 1,778.07 2.25% 0.00 0.00% 97.75 1,778.07 2.25% 4,247.54 77,262.75 97.75%
02.03.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCION mes 4.50 9,074.25 40,834.13 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.50 40,834.13 100.00%
02.03.04 EXCAVACION EN METERIAL SUELTO m3 4,222.57 30.32 128,028.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4,222.57 128,028.32 100.00%
02.03.05 DEMOLICION DE CANAL DE CONCRETO CON MARTILLO DEMOLEDOR m3 1,240.39 49.65 61,585.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,240.39 61,585.36 100.00%
02.03.06 RELLENO, NIVELACION Y COMPACTACION CON MATERIAL CLASIFICAD m3 9,741.33 67.64 658,903.56 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9,741.33 658,903.56 100.00%
02.03.07 RELLENO CON MATERIAL PROPIO m3 114.80 21.92 2,516.42 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 114.80 2,516.42 100.00%
02.03.08 ELIMINACION DE MATERIAL PRODUCTO DE LA DEMOLICION CON EQUIPO Di m3 1,215.58 28.44 34,571.10 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,215.58 34,571.10 100.00%
02.03.09 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Dist m3 520.96 20.22 10,533.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 520.96 10,533.81 100.00%
02.03.10 EMPEDRADO DE PISO SOBRE TERRENO COMPACTO TRAMO ALTO PATA DE m3 181.26 136.59 24,758.30 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 181.26 24,758.30 100.00%
02.03.11 MURO DE PIEDRA CARAVISTA TRAMO ALTO PATA DE 34+960 AL 36+020 m3 365.70 136.59 49,950.96 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 365.70 49,950.96 100.00%
02.03.12 ENCOFRADO Y DESENCOFRADO NORMAL m2 12,186.27 40.58 494,518.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12,186.27 494,518.84 100.00%
02.03.13 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 254.01 35.25 8,953.85 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 254.01 8,953.85 100.00%
02.03.14 CONCRETO f´c=175Kg/cm2 m3 1,441.13 557.52 803,458.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,441.13 803,458.80 100.00%
02.03.15 JUNTAS ASFALTICAS m 5,486.43 6.54 35,881.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5,486.43 35,881.25 100.00%
02.03.16 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 309.32 100.78 31,173.27 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 309.32 31,173.27 100.00%
02.03.17 SELLADO DE GRIETAS Y FISURAS ep=2cm m 546.80 50.51 27,618.87 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 546.80 27,618.87 100.00%
02.03.18 SELLADO DE GRIETAS Y FISURAS A PRESION ep=2cm m 449.49 68.08 30,601.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 449.49 30,601.28 100.00%
02.04 MEJORAMIENTO DEL CANOAS EXISTENTES
02.04.01 LIMPIEZA Y DESBROSE MANUAL m2 1,090.00 0.91 991.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,090.00 991.90 100.00%
02.04.02 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 130.80 15.16 1,982.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 130.80 1,982.93 100.00%
02.04.03 EMBOQUILLADO DE PIEDRA CON CONCRETO FC=140KG/CM2+60%PM, e=20 m2 99.31 54.23 5,385.58 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 99.31 5,385.58 100.00%
02.04.04 PICADO, LIMPIEZA DE MUROS, BASE Y PAÑOS DEL CANAL e=2.5cm m2 6.89 25.89 178.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.89 178.38 100.00%
02.04.05 DEMOLICION MANUAL DE CONCRETO m3 2.13 60.65 129.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.13 129.18 100.00%
02.04.06 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 5.16 35.25 181.89 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.16 181.89 100.00%
02.04.07 COLOCACION DE ACERO FY=4200 KG/CM2, GRADO 60 EN ESTRUCTURAS kg 343.22 8.13 2,790.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 343.22 2,790.38 100.00%
02.04.08 ENCOFRADO Y DESENCOFRA CARAVISTA m2 61.01 54.85 3,346.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 61.01 3,346.40 100.00%
02.04.09 CONCRETO f´c=210Kg/cm2 m3 7.51 581.72 4,368.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.51 4,368.72 100.00%
02.04.10 CONCRETO f´c=175Kg/cm2 m3 5.00 557.52 2,787.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.00 2,787.60 100.00%
02.04.11 JUNTAS ASFALTICAS m 12.90 6.54 84.37 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.90 84.37 100.00%
02.04.12 REPARACION Y RESANE EN CANOAS EXISTENTES e=8cm (C:A 1:4) m2 4.01 80.46 322.64 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.01 322.64 100.00%
02.05 MUROS DE PROTECCION DE LAS CANOAS EXISTENTES (H=5.0m L=5m., H=3.0m L=15m y H=2.5m. L=7.30m.)
02.05.01 LIMPIEZA Y DESBROSE MANUAL m2 51.91 0.91 47.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 51.91 47.24 100.00%
02.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 80.98 4.54 367.65 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 80.98 367.65 100.00%
02.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 256.31 30.32 7,771.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 256.31 7,771.32 100.00%
02.05.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 116.60 21.92 2,555.87 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 116.60 2,555.87 100.00%
02.05.05 EMBOQUILLADO DE PIEDRA CON CONCRETO FC=140KG/CM2+60%PM, e=20 m2 23.40 54.23 1,268.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.40 1,268.98 100.00%
02.05.06 CONCRETO CICLOPEO F'C=140 KG/CM2+70%PG m3 27.90 190.05 5,302.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.90 5,302.40 100.00%
02.05.07 CONCRETO CICLOPEO F'C=140 KG/CM2+50%PG m3 20.44 261.58 5,346.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 20.44 5,346.70 100.00%
02.05.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 191.10 40.58 7,754.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 191.10 7,754.84 100.00%
02.05.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 2,626.09 6.55 17,200.89 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2,626.09 17,200.89 100.00%
02.05.10 CONCRETO f´c=210Kg/cm2 m3 68.30 581.72 39,731.48 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 68.30 39,731.48 100.00%
02.05.11 COLOCACION DE FILTRO DE GRAVA 3/4" a 1 1/2" m3 3.02 58.00 175.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.02 175.16 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
02.05.12 TUBERIA PVC SAP Ø=4", C-5 NTP ISO 399.002 m 27.30 11.37 310.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.30 310.40 100.00%
02.05.13 TUBERIA PVC SAP Ø=21/2", C-5 NTP ISO 399.002 m 3.70 8.43 31.19 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.70 31.19 100.00%
02.05.14 TUBERIA PVC SAP Ø=2", C-5 NTP ISO 399.002 m 8.40 7.38 61.99 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.40 61.99 100.00%
02.06 MEJORAMIENTO DE POZAS DESIPADORAS DE ENERGIA (13 UND)
02.06.01 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 7.80 15.16 118.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.80 118.25 100.00%
02.06.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 8.00 4.54 36.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 36.32 100.00%
02.06.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 6.00 30.32 181.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 181.92 100.00%
02.06.04 REFINE, COMPACTACION Y NIVELACION m2 8.00 2.34 18.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 18.72 100.00%
02.06.05 DEMOLICION MANUAL DE CONCRETO m3 1.20 60.65 72.78 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.20 72.78 100.00%
02.06.06 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 1.11 35.25 39.13 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.11 39.13 99.99%
02.06.07 COLOCACION DE ACERO FY=4200 KG/CM2, GRADO 60 EN ESTRUCTURAS kg 51.09 8.13 415.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 51.09 415.36 100.00%
02.06.08 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 23.27 56.94 1,324.99 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.27 1,324.99 100.00%
02.06.09 CONCRETO f´c=210Kg/cm2 m3 1.10 581.72 639.89 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.10 639.89 100.00%
02.06.10 CONCRETO f´c=175Kg/cm2 m3 2.10 557.52 1,170.79 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.10 1,170.79 100.00%
02.06.11 RESANE EN MUROS, BASE, PAÑOS DE CANAL y OBRAS DE ARTE EXISTENTE m2 6.54 100.78 659.10 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.54 659.10 100.00%
02.06.12 JUNTAS ASFALTICAS m 11.00 6.54 71.94 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.00 71.94 100.00%
02.06.13 SELLADO DE GRIETAS Y FISURAS ep=2cm m 37.90 50.51 1,914.33 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 37.90 1,914.33 100.00%
02.07 MEJORAMIENTO DEL ACUEDUCTO 35+438 (L=8.30m.)
02.07.01 PICADO DE MUROS, BASE Y PAÑOS DEL CANAL e=2.5cm m2 1.29 25.89 33.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.29 33.40 99.99%
02.07.02 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 1.29 35.25 45.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.29 45.47 100.01%
02.07.03 COLOCACION DE ACERO FY=4200 KG/CM2, GRADO 60 EN ESTRUCTURAS kg 15.90 8.13 129.27 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.90 129.27 100.00%
02.07.04 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 8.24 56.94 469.19 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.24 469.19 100.00%
02.07.05 CONCRETO f´c=210Kg/cm2 m3 0.52 581.72 302.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.52 302.49 100.00%
02.08 MEJORAMIENTO DESARENADOR EXISTENTE 34+948 Y CANAL DE LIMPIA
02.08.01 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 7.50 15.16 113.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.50 113.70 100.00%
02.08.02 PICADO DE MUROS, BASES, PAÑOS DEL CANAL Y OBRAS DE ARTE e=2.5cm m2 1.25 25.89 32.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.25 32.36 100.01%
02.08.03 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 1.25 35.25 44.06 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.25 44.06 100.01%
02.08.04 COLOCACION DE ACERO FY=4200 KG/CM2, GRADO 60 EN ESTRUCTURAS kg 16.22 8.13 131.87 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 16.22 131.87 100.00%
02.08.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 8.00 56.94 455.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 455.52 100.00%
02.08.06 CONCRETO f´c=210Kg/cm2 m3 0.50 581.72 290.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 290.86 100.00%
02.08.07 SELLADO DE GRIETAS Y FISURAS ep=2cm m 17.50 50.51 883.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.50 883.93 100.00%
02.08.08 DESMONTAJE DE COMPUERTA METALICA TIPO IZAJE (0.70x0.90m.), Ht=3.00m und 1.00 447.72 447.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 447.72 100.00%
02.08.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA, IZAJE TIPO ARMACOund ( 1.00 3,559.35 3,559.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 3,559.35 100.00%
02.09 MEJORAMIENTO BOCATOMA DE FONDO 37+940
02.09.01 LIMPIEZA Y DESBROSE MANUAL m2 137.25 0.91 124.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 137.25 124.90 100.00%
02.09.02 DESMONTAJE DE COMPUERTA METALICA TIPO IZAJE EN BOCATOMA DE und 2.00 447.72 895.44 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 895.44 100.00%
02.09.03 DESMONTAJE DE REJILLA METALICA 1.40X5.00m., e=1/4" - espaciado 5Cm.. und 1.00 223.63 223.63 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 223.63 100.00%
02.09.04 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO (0.85x0.6und 1.00 1,713.48 1,713.48 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 1,713.48 100.00%
02.09.05 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO (0.60x0.6und 1.00 1,713.48 1,713.48 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 1,713.48 100.00%
02.09.06 SUMINISTRO E INST. DE REJILLA DE PLATINA 1/4"X1"- Espaciado 5Cm. (1.40x und 1.00 989.84 989.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 989.84 100.00%
02.10 MEJORAMIENTO DE TOMAS LATERALES (27 UND)
02.10.01 DESMONTAJE DE COMPUERTA METALICA TIPO IZAJE EN TOMAS LATERA und 27.00 201.13 5,430.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.00 5,430.51 100.00%
02.10.02 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO (Bc=0. und 17.00 1,019.84 17,337.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.00 17,337.28 100.00%
02.10.03 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO (Bc=0. und 3.00 899.84 2,699.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 2,699.52 100.00%
02.10.04 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO (Bc=0. und 3.00 835.11 2,505.33 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 2,505.33 100.00%
02.10.05 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO (Bc=1. und 1.00 1,797.72 1,797.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 1,797.72 100.00%
02.10.06 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO (Bc=0. und 3.00 408.41 1,225.23 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 1,225.23 100.00%
02.11 CANOAS L=Variable (18 UND)
02.11.01 LIMPIEZA Y DESBROSE MANUAL m2 335.60 0.91 305.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 335.60 305.40 100.00%
02.11.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 453.35 4.54 2,058.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 453.35 2,058.21 100.00%
02.11.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 225.82 30.32 6,846.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 225.82 6,846.86 100.00%
02.11.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 282.28 18.19 5,134.67 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 282.28 5,134.67 100.00%
02.11.05 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 86.26 331.36 28,583.11 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 86.26 28,583.11 100.00%
02.11.06 ENCOFRADO Y DESENCOFRA CARAVISTA m2 237.49 54.85 13,026.33 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 237.49 13,026.33 100.00%
02.11.07 ACERO FY=4200 KG/CM2, GRADO 60 kg 3,399.84 6.55 22,268.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3,399.84 22,268.95 100.00%
02.11.08 CONCRETO f´c=210Kg/cm2 m3 48.88 581.72 28,434.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 48.88 28,434.47 100.00%
02.11.09 EMBOQUILLADO DE PIEDRA CON CONCRETO FC=140KG/CM2+60%PM, e=20 m2 216.80 54.23 11,757.06 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 216.80 11,757.06 100.00%
02.11.10 CONCRETO CICLOPEO F'C=175 KG/CM2+30%PM m3 54.72 343.68 18,806.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 54.72 18,806.17 100.00%
02.11.11 JUNTAS ASFALTICAS m 109.20 6.54 714.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 109.20 714.17 100.00%
02.12 PASES VEHICULARES (05 UND)
02.12.01 LIMPIEZA Y DESBROSE MANUAL m2 72.00 0.91 65.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 72.00 65.52 100.00%
02.12.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 72.00 4.54 326.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 72.00 326.88 100.00%
02.12.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 126.00 30.32 3,820.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 126.00 3,820.32 100.00%
02.12.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 102.00 21.92 2,235.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 102.00 2,235.84 100.00%
02.12.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 282.28 18.19 5,134.67 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 282.28 5,134.67 100.00%
02.12.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 69.20 331.36 22,930.11 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 69.20 22,930.11 100.00%
02.12.07 ENCOFRADO Y DESENCOFRA CARAVISTA m2 76.00 54.85 4,168.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 76.00 4,168.60 100.00%
02.12.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 2,023.16 6.55 13,251.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2,023.16 13,251.70 100.00%
02.12.09 CONCRETO f´c=210Kg/cm2 m3 19.00 581.72 11,052.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 19.00 11,052.68 100.00%
02.12.10 BARANDA METALICA CON TUBO DE F°GALV. DE 2" m 102.00 57.80 5,895.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 102.00 5,895.60 100.00%
02.12.11 PINTURA EPOXICA ANTICORROSIVA m2 15.50 36.24 561.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.50 561.72 100.00%
02.12.12 JUNTAS DE DILATACION CON TECNOPORT E=1" m 20.00 3.76 75.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 20.00 75.20 100.00%
02.13 PASE PEATONAL (17 UND)
02.13.01 LIMPIEZA Y DESBROSE MANUAL m2 34.00 0.91 30.94 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 34.00 30.94 100.00%
02.13.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 34.00 4.54 154.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 34.00 154.36 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
02.13.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 107.08 30.32 3,246.67 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 107.08 3,246.67 100.00%
02.13.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 8.50 21.92 186.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.50 186.32 100.00%
02.13.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 123.22 18.19 2,241.37 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 123.22 2,241.37 100.00%
02.13.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 71.15 331.36 23,576.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 71.15 23,576.26 100.00%
02.13.07 ENCOFRADO Y DESENCOFRA CARAVISTA m2 129.20 54.85 7,086.62 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 129.20 7,086.62 100.00%
02.13.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 1,635.18 6.55 10,710.43 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,635.18 10,710.43 100.00%
02.13.09 CONCRETO f´c=210Kg/cm2 m3 27.20 581.72 15,822.78 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.20 15,822.78 100.00%
02.13.10 BARANDA METALICA CON TUBO DE F°GALV. DE 2" m 344.08 57.80 19,887.82 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 344.08 19,887.82 100.00%
02.13.11 PINTURA EPOXICA ANTICORROSIVA m2 52.30 36.24 1,895.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 52.30 1,895.35 100.00%
02.14 TAPAS DE CANAL (L=75m. A=3.10m.; L=72m. A=3.30; L=50m. A=1.45m. y L=184m., A=1.30m.)
02.14.01 LIMPIEZA Y DESBROSE MANUAL m2 228.60 0.91 208.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 228.60 208.03 100.00%
02.14.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 228.60 4.54 1,037.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 228.60 1,037.84 100.00%
02.14.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 76.20 30.32 2,310.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 76.20 2,310.38 100.00%
02.14.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 95.25 18.19 1,732.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 95.25 1,732.60 100.00%
02.14.05 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 76.20 331.36 25,249.63 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 76.20 25,249.63 100.00%
02.14.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 593.34 40.58 24,077.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 593.34 24,077.74 100.00%
02.14.07 ACERO FY=4200 KG/CM2, GRADO 60 kg 237.68 6.55 1,556.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 237.68 1,556.80 100.00%
02.14.08 CONCRETO f´c=210Kg/cm2 m3 59.13 581.72 34,397.10 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 59.13 34,397.10 100.00%
02.15 MURO DE CONCRETO CICLOPEO (L=5.00m.)
02.15.01 LIMPIEZA Y DESBROSE MANUAL m2 12.00 0.91 10.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.00 10.92 100.00%
02.15.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 12.00 4.54 54.48 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.00 54.48 100.00%
02.15.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 25.90 30.32 785.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 25.90 785.29 100.00%
02.15.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 14.35 21.92 314.55 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.35 314.55 100.00%
02.15.05 CONCRETO CICLOPEO F'C=140 KG/CM2+50%PG m3 14.00 261.58 3,662.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.00 3,662.12 100.00%
02.15.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 28.00 40.58 1,136.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 28.00 1,136.24 100.00%
02.15.07 COLOCACION DE FILTRO DE GRAVA 3/4" a 1 1/2" m3 0.60 58.00 34.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.60 34.80 100.00%
02.15.08 TUBERIA PVC SAP Ø=4", C-5 NTP ISO 399.002 m 5.00 11.37 56.85 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.00 56.85 100.00%
02.15.09 TUBERIA PVC SAP Ø=2", C-5 NTP ISO 399.002 m 2.40 7.38 17.71 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.40 17.71 100.01%
02.16 MUROS DE CONCRETO ARMADO (H=3.0m L=35m., H=3.5m L=10m, H=4.5m. L=7m., H=5m. L=40m., H=5.5m. L=3m.)
02.16.01 LIMPIEZA Y DESBROSE MANUAL m2 377.30 0.91 343.34 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 377.30 343.34 100.00%
02.16.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 377.30 4.54 1,712.94 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 377.30 1,712.94 100.00%
02.16.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1,321.40 30.32 40,064.85 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,321.40 40,064.85 100.00%
02.16.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 725.90 21.92 15,911.73 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 725.90 15,911.73 100.00%
02.16.05 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 14.55 24.01 349.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.55 349.35 100.00%
02.16.06 CONCRETO CICLOPEO F'C=140 KG/CM2+70%PG m3 139.20 190.05 26,454.96 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 139.20 26,454.96 100.00%
02.16.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 807.13 40.58 32,753.34 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 807.13 32,753.34 100.00%
02.16.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 17,456.62 6.55 114,340.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17,456.62 114,340.86 100.00%
02.16.09 CONCRETO f´c=210Kg/cm2 m3 468.15 581.72 272,332.22 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 468.15 272,332.22 100.00%
02.16.10 COLOCACION DE FILTRO DE GRAVA 3/4" a 1 1/2" m3 10.26 58.00 595.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.26 595.08 100.00%
02.16.11 TUBERIA PVC SAP Ø=4", C-5 NTP ISO 399.002 m 95.00 11.37 1,080.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 95.00 1,080.15 100.00%
02.16.12 TUBERIA PVC SAP Ø=21/2", C-5 NTP ISO 399.002 m 46.50 8.43 392.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 46.50 392.00 100.00%
02.16.13 TUBERIA PVC SAP Ø=2", C-5 NTP ISO 399.002 m 31.50 7.38 232.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 31.50 232.47 100.00%
02.17 TOMAS PREDIALES Bc=0.25XHc1=0.25m. y Hc=Variable (95 UND)
02.17.01 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 52.25 4.54 237.22 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 52.25 237.22 100.00%
02.17.02 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 93.79 30.32 2,843.71 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 93.79 2,843.71 100.00%
02.17.03 DEMOLICION MANUAL DE CONCRETO m3 4.87 60.65 295.37 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.87 295.37 100.00%
02.17.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 41.10 21.92 900.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 41.10 900.91 100.00%
02.17.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 57.38 18.19 1,043.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 57.38 1,043.74 100.00%
02.17.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 181.13 40.58 7,350.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 181.13 7,350.26 100.00%
02.17.07 ACERO FY=4200 KG/CM2, GRADO 60 kg 204.46 6.55 1,339.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 204.46 1,339.21 100.00%
02.17.08 CONCRETO f´c=210Kg/cm2 m3 22.99 581.72 13,373.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 22.99 13,373.74 100.00%
02.17.09 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 112.81 29.15 3,288.41 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 112.81 3,288.41 100.00%
02.17.10 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE ((Bc=0.25xHc1=0. und 32.00 458.41 14,669.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 32.00 14,669.12 100.00%
02.17.11 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE (Bc=0.25xHc1=0.2 und 11.00 438.41 4,822.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.00 4,822.51 100.00%
02.17.12 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE (Bc=0.25xHc1=0.2 und 6.00 438.41 2,630.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 2,630.46 100.00%
02.17.13 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE (Bc=0.25xHc1=0. und 2.00 358.33 716.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 716.66 100.00%
02.17.14 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE (Bc=0.25xHc1=0. und 28.00 358.33 10,033.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 28.00 10,033.24 100.00%
02.17.15 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE (Bc=0.25xHc1=0.2 und 2.00 358.33 716.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 716.66 100.00%
02.17.16 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE (Bc=0.25xHc1=0.2 und 14.00 358.33 5,016.62 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.00 5,016.62 100.00%
02.18 ACUEDUCTO O PUENTE CANAL L=4.00m. (01 UND)
02.18.01 LIMPIEZA Y DESBROSE MANUAL m2 5.10 0.91 4.64 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.10 4.64 100.02%
02.18.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 5.00 4.54 22.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.00 22.70 100.00%
02.18.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.62 30.32 79.44 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.62 79.44 100.00%
02.18.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 1.96 21.92 42.96 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.96 42.96 100.01%
02.18.05 CONCRETO CICLOPEO F'C=140 KG/CM2+50%PG m3 1.42 261.58 371.44 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.42 371.44 100.00%
02.18.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 13.61 40.58 552.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.61 552.29 100.00%
02.18.07 ACERO FY=4200 KG/CM2, GRADO 60 kg 87.90 6.55 575.75 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 87.90 575.75 100.00%
02.18.08 CONCRETO f´c=210Kg/cm2 m3 0.92 581.72 535.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.92 535.18 100.00%
02.18.09 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 4.80 29.15 139.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.80 139.92 100.00%
02.18.10 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 6.84 18.64 127.50 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.84 127.50 100.00%
02.18.11 JUNTAS ASFALTICAS m 1.30 6.54 8.50 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.30 8.50 100.02%
02.18.12 PINTURA LATEX 02 MANOS EN MUROS EXTERIORES m2 6.84 7.97 54.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.84 54.51 100.01%
02.19 ESPIGONES L=Variable - PROTECCION CANAL (04 UND)
02.19.01 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 142.68 4.54 647.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 142.68 647.77 100.00%
02.19.02 EXCAVACION CON MAQUINARIA m3 791.48 21.37 16,913.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 791.48 16,913.93 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
02.19.03 ENRROCADO Y ACOMODADO CON MAQUINARIA Dmedio de 1.00@2.00m. m3 791.48 67.94 53,773.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 791.48 53,773.15 100.00%
02.19.04 CONCRETO CICLOPEO F'C=140 KG/CM2+70%PG - ESPIGON m3 364.94 161.10 58,791.83 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 364.94 58,791.83 100.00%
03 MEJORAMIENTO Y AMPLIACION DE CANALES LATERALES (22 CANALES LATERALES)
03.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 01 - CANGARI
03.01.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL
03.01.01.01 LIMPIEZA Y DESBROSE MANUAL m2 2,436.00 0.91 2,216.76 2436 2,216.76 100.00% 0.00 0.00% 2436 2,216.76 100.00% 0.00 0.00 0.00%
03.01.01.02 DEMOLICION MANUAL DE CONCRETO m3 21.86 60.65 1,325.81 21.49 1,303.37 98.31% 0.00 0.00% 21.49 1,303.37 98.31% 0.37 22.44 1.69%
03.01.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.30 9,074.25 2,722.28 0.13 1,179.65 43.33% 0.00 0.00% 0.13 1,179.65 43.33% 0.17 1,542.62 56.67%
03.01.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 30.77 30.32 932.95 30.77 932.95 100.00% 0.00 0.00% 30.77 932.95 100.00% 0.00 0.00 0.00%
03.01.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 32.80 20.22 663.22 32.24 651.89 98.29% 0.00 0.00% 32.24 651.89 98.29% 0.56 11.32 1.71%
03.01.01.06 REFINE, COMPACTACION Y NIVELACION m2 346.41 2.34 810.60 345.04 807.39 99.60% 0.00 0.00% 345.04 807.39 99.60% 1.37 3.21 0.40%
03.01.01.07 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 8.00 35.25 282.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 282.00 100.00%
03.01.01.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 267.80 40.58 10,867.32 13.57 550.67 5.07% 0.00 0.00% 13.57 550.67 5.07% 254.23 10,316.65 94.93%
03.01.01.09 CONCRETO f´c=175Kg/cm2 m3 37.24 557.52 20,762.04 26.62 14,841.18 71.48% 0.00 0.00% 26.62 14,841.18 71.48% 10.62 5,920.86 28.52%
03.01.01.10 JUNTAS ASFALTICAS m 161.52 6.54 1,056.34 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 161.52 1,056.34 100.00%
03.01.01.11 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 35.30 25.96 916.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 35.30 916.39 100.00%
03.01.01.12 CURADO DE CONCRETO m2 242.27 0.49 118.71 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 242.27 118.71 100.00%
03.01.02 TOMA LATERAL TIPO I - CANGARI (14 UND)
03.01.02.01 LIMPIEZA Y DESBROSE MANUAL m2 42.00 0.91 38.22 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 42.00 38.22 100.00%
03.01.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 26.60 4.54 120.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 26.60 120.76 100.00%
03.01.02.03 DEMOLICION MANUAL DE CONCRETO m3 1.12 60.65 67.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.12 67.93 100.00%
03.01.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 3.58 30.32 108.55 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.58 108.55 100.00%
03.01.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 4.60 20.22 93.01 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.60 93.01 100.00%
03.01.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 46.26 56.94 2,634.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 46.26 2,634.04 100.00%
03.01.02.07 CONCRETO f´c=175Kg/cm2 m3 3.90 557.52 2,174.33 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.90 2,174.33 100.00%
03.01.02.08 JUNTAS ASFALTICAS m 35.84 6.54 234.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 35.84 234.39 100.00%
03.01.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 14.00 284.30 3,980.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.00 3,980.20 100.00%
03.01.03 TOMA LATERAL TIPO II - CANGARI (01 UND)
03.01.03.01 LIMPIEZA Y DESBROSE MANUAL m2 4.00 0.91 3.64 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 3.64 100.00%
03.01.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 4.54 6.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.50 6.81 100.00%
03.01.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 60.65 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.09 5.46 99.97%
03.01.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.51 30.32 15.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.51 15.46 100.02%
03.01.03.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.65 20.22 13.14 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.65 13.14 100.02%
03.01.03.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 6.14 56.94 349.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.14 349.61 100.00%
03.01.03.07 CONCRETO f´c=175Kg/cm2 m3 0.58 557.52 323.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.58 323.36 100.00%
03.01.03.08 JUNTAS ASFALTICAS m 2.56 6.54 16.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.56 16.74 100.01%
03.01.03.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 2.00 284.30 568.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 568.60 100.00%
03.01.04 MEJORAMIENTO DE TOMAS LATERALES EXISTENTE - CANGARI (03 UND)
03.01.04.01 LIMPIEZA Y DESBROSE MANUAL m2 6.00 0.91 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 5.46 100.00%
03.01.04.02 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 0.05 100.78 5.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.05 5.04 99.98%
03.01.04.03 DESMONTAJE DE COMPUERTA METALICA (0.25X0.65m.), e=3/16" und 3.00 36.20 108.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 108.60 100.00%
03.01.04.04 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 3.00 284.30 852.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 852.90 100.00%
03.01.05 AFORADOR PARSHALL - CANGARI (01 UND)
03.01.05.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.01.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.01.05.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.01.05.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.01.05.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.01.05.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.01.05.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.01.05.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.01.05.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.01.05.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.01.05.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.01.05.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.01.05.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.01.05.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.01.05.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.01.06 PASES PEATONALES - CANGARI (02 UND)
03.01.06.01 LIMPIEZA Y DESBROSE MANUAL m2 11.44 0.91 10.41 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.44 10.41 100.00%
03.01.06.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 8.80 4.54 39.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.80 39.95 100.01%
03.01.06.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.51 30.32 76.10 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.51 76.10 100.00%
03.01.06.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 0.40 21.92 8.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.40 8.77 99.98%
03.01.06.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 2.64 18.19 48.02 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.64 48.02 100.00%
03.01.06.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 1.06 331.36 351.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.06 351.24 100.00%
03.01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.00 40.58 568.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.00 568.12 100.00%
03.01.06.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 62.43 6.55 408.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 62.43 408.92 100.00%
03.01.06.09 CONCRETO f´c=210Kg/cm2 m3 1.52 581.72 884.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.52 884.21 100.00%
03.01.06.10 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 6.00 18.64 111.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 111.84 100.00%
03.01.06.11 PINTURA LATEX 02 MANOS EN MUROS EXTERIORES m2 6.00 7.97 47.82 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 47.82 100.00%
03.02 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 02 - CANGARI
03.02.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL
03.02.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,640.10 0.91 1,492.49 1330.05 1,210.35 81.10% 0.00 0.00% 1330.05 1,210.35 81.10% 310.05 282.15 18.90%
03.02.01.02 DEMOLICION MANUAL DE CONCRETO m3 6.72 60.65 407.57 22.29 1,351.89 331.69% 0.00 0.00% 22.29 1,351.89 331.69% -15.57 -944.32 -231.70%
03.02.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.50 9,074.25 4,537.13 0.5 4,537.13 100.00% 0.00 0.00% 0.5 4,537.13 100.00% 0.00 0.00 0.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.02.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 261.96 30.32 7,942.63 615.12 18,650.44 234.81% 0.00 0.00% 615.12 18,650.44 234.81% -353.16 -10,707.81 -134.81%
03.02.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 10.08 20.22 203.82 33.43 675.95 331.64% 0.00 0.00% 33.43 675.95 331.64% -23.35 -472.14 -231.64%
03.02.01.06 REFINE, COMPACTACION Y NIVELACION m2 830.84 2.34 1,944.17 378.32 885.27 45.53% 0.00 0.00% 378.32 885.27 45.53% 452.52 1,058.90 54.47%
03.02.01.07 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 13.00 35.25 458.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.00 458.25 100.00%
03.02.01.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 538.30 40.58 21,844.21 37.23 1,510.79 6.92% 0.00 0.00% 37.23 1,510.79 6.92% 501.07 20,333.42 93.08%
03.02.01.09 CONCRETO f´c=175Kg/cm2 m3 79.90 557.52 44,545.85 47.11 26,264.77 58.96% 0.00 0.00% 47.11 26,264.77 58.96% 32.79 18,281.08 41.04%
03.02.01.10 JUNTAS ASFALTICAS m 476.17 6.54 3,114.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 476.17 3,114.15 100.00%
03.02.01.11 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 76.86 25.96 1,995.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 76.86 1,995.29 100.00%
03.02.01.12 CURADO DE CONCRETO m2 445.90 0.49 218.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 445.90 218.49 100.00%
03.02.02 TOMA LATERAL TIPO I - CANGARI (18 UND)
03.02.02.01 LIMPIEZA Y DESBROSE MANUAL m2 54.00 0.91 49.14 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 54.00 49.14 100.00%
03.02.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 34.20 4.54 155.27 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 34.20 155.27 100.00%
03.02.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.66 60.65 40.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.66 40.03 100.00%
03.02.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 4.60 30.32 139.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.60 139.47 100.00%
03.02.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 5.83 20.22 117.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.83 117.88 100.00%
03.02.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 59.48 56.94 3,386.79 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 59.48 3,386.79 100.00%
03.02.02.07 CONCRETO f´c=175Kg/cm2 m3 4.90 557.52 2,731.85 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.90 2,731.85 100.00%
03.02.02.08 JUNTAS ASFALTICAS m 46.08 6.54 301.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 46.08 301.36 100.00%
03.02.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 18.00 284.30 5,117.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 18.00 5,117.40 100.00%
03.02.03 TOMA LATERAL TIPO II - CANGARI (01 UND)
03.02.03.01 LIMPIEZA Y DESBROSE MANUAL m2 4.00 0.91 3.64 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 3.64 100.00%
03.02.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 4.54 6.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.50 6.81 100.00%
03.02.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 60.65 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.09 5.46 99.97%
03.02.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.51 30.32 15.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.51 15.46 100.02%
03.02.03.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.65 20.22 13.14 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.65 13.14 100.02%
03.02.03.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 6.14 56.94 349.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.14 349.61 100.00%
03.02.03.07 CONCRETO f´c=175Kg/cm2 m3 0.52 557.52 289.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.52 289.91 100.00%
03.02.03.08 JUNTAS ASFALTICAS m 2.56 6.54 16.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.56 16.74 100.01%
03.02.03.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 2.00 284.30 568.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 568.60 100.00%
03.02.04 AFORADOR PARSHALL - CANGARI (01 UND)
03.02.04.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.02.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.02.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.02.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.02.04.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.02.04.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.02.04.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.02.04.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.02.04.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.02.04.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.02.04.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.02.04.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.02.04.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.02.04.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.02.04.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.02.05 PASES PEATONALES - CANGARI (01 UND)
03.02.05.01 LIMPIEZA Y DESBROSE MANUAL m2 5.72 0.91 5.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.72 5.21 99.91%
03.02.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 4.40 4.54 19.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.40 19.98 99.98%
03.02.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.25 30.32 37.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.25 37.90 100.00%
03.02.05.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 0.20 21.92 4.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.20 4.38 100.09%
03.02.05.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 1.32 18.19 24.01 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.32 24.01 100.00%
03.02.05.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 0.53 331.36 175.62 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.53 175.62 100.00%
03.02.05.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 7.00 40.58 284.06 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.00 284.06 100.00%
03.02.05.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 31.21 6.55 204.43 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 31.21 204.43 100.00%
03.02.05.09 CONCRETO f´c=210Kg/cm2 m3 0.76 581.72 442.11 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.76 442.11 100.00%
03.02.05.10 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 3.00 18.64 55.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 55.92 100.00%
03.02.05.11 PINTURA LATEX 02 MANOS EN MUROS EXTERIORES m2 3.00 7.97 23.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 23.91 100.00%
03.02.06 TAPA DE CONCRETO EN CANAL ABIERTO - CANGARI (5 MT)
03.02.06.01 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.10 30.32 3.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.10 3.03 100.07%
03.02.06.02 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 0.10 331.36 33.14 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.10 33.14 99.99%
03.02.06.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 1.28 40.58 51.94 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.28 51.94 100.00%
03.02.06.04 ACERO FY=4200 KG/CM2, GRADO 60 kg 18.31 6.55 119.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 18.31 119.93 100.00%
03.02.06.05 CONCRETO f´c=210Kg/cm2 m3 0.42 581.72 244.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.42 244.32 100.00%
03.02.07 POZA DESIPADORA DE ENERGIA - CANGARI (08 UND)
03.02.07.01 LIMPIEZA Y DESBROSE MANUAL m2 46.20 0.91 42.04 11.55 10.51 25.00% 0.00 0.00% 11.55 10.51 25.00% 34.65 31.53 75.00%
03.02.07.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 19.51 4.54 88.58 4.88 22.16 25.01% 0.00 0.00% 4.88 22.16 25.01% 14.63 66.42 74.98%
03.02.07.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 21.85 30.32 662.49 5.46 165.55 24.99% 0.00 0.00% 5.46 165.55 24.99% 16.39 496.94 75.01%
03.02.07.04 REFINE, COMPACTACION Y NIVELACION m2 84.62 2.34 198.01 21.15 49.49 24.99% 0.00 0.00% 21.15 49.49 24.99% 63.47 148.52 75.01%
03.02.07.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 27.31 20.22 552.21 6.83 138.10 25.01% 0.00 0.00% 6.83 138.10 25.01% 20.48 414.11 74.99%
03.02.07.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 19.51 24.01 468.44 4.88 117.17 25.01% 0.00 0.00% 4.88 117.17 25.01% 14.63 351.27 74.99%
03.02.07.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 61.69 40.58 2,503.38 14.05 570.15 22.78% 0.00 0.00% 14.05 570.15 22.78% 47.64 1,933.23 77.22%
03.02.07.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 346.04 6.55 2,266.56 86.51 566.64 25.00% 0.00 0.00% 86.51 566.64 25.00% 259.53 1,699.92 75.00%
03.02.07.09 CONCRETO f´c=210Kg/cm2 m3 8.61 581.72 5,008.61 2.15 1,250.70 24.97% 0.00 0.00% 2.15 1,250.70 24.97% 6.46 3,757.91 75.03%
03.02.07.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 59.11 29.15 1,723.06 14.78 430.84 25.00% 0.00 0.00% 14.78 430.84 25.00% 44.33 1,292.22 75.00%
03.02.07.11 JUNTAS ASFALTICAS m 21.60 6.54 141.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 21.60 141.26 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.03 CANAL LATERAL 03 - CHIWA
03.03.01 CONSTRUCCION DEL CANAL LATERAL 03 - CHIWA 903.54 m.
03.03.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,056.00 0.91 960.96 1490.84 1,356.66 141.18% 0.00 0.00% 1490.84 1,356.66 141.18% -434.84 -395.70 -41.18%
03.03.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.50 9,074.25 4,537.13 0.5 4,537.13 100.00% 0.00 0.00% 0.5 4,537.13 100.00% 0.00 0.00 0.00%
03.03.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 344.99 30.32 10,460.10 773.91 23,464.95 224.33% 0.00 0.00% 773.91 23,464.95 224.33% -428.92 -13,004.85 -124.33%
03.03.01.04 REFINE, COMPACTACION Y NIVELACION m2 844.80 2.34 1,976.83 1092.67 2,556.85 129.34% 0.00 0.00% 1092.67 2,556.85 129.34% -247.87 -580.02 -29.34%
03.03.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 544.00 40.58 22,075.52 14.46 586.79 2.66% 0.00 0.00% 14.46 586.79 2.66% 529.54 21,488.73 97.34%
03.03.01.06 CONCRETO f´c=175Kg/cm2 m3 83.20 557.52 46,385.66 47.24 26,337.24 56.78% 0.00 0.00% 47.24 26,337.24 56.78% 35.96 20,048.42 43.22%
03.03.01.07 JUNTAS ASFALTICAS m 409.60 6.54 2,678.78 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 409.60 2,678.78 100.00%
03.03.01.08 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 115.20 25.96 2,990.59 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 115.20 2,990.59 100.00%
03.03.01.09 CURADO DE CONCRETO m2 448.00 0.49 219.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 448.00 219.52 100.00%
03.03.02 TOMA LATERAL TIPO I - CHIWA (26 UND)
03.03.02.01 LIMPIEZA Y DESBROSE MANUAL m2 78.00 0.91 70.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 78.00 70.98 100.00%
03.03.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 49.40 4.54 224.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 49.40 224.28 100.00%
03.03.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 6.64 30.32 201.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.64 201.32 100.00%
03.03.02.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 8.30 20.22 167.83 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.30 167.83 100.00%
03.03.02.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 85.91 56.94 4,891.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 85.91 4,891.72 100.00%
03.03.02.06 CONCRETO f´c=175Kg/cm2 m3 6.77 557.52 3,774.41 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.77 3,774.41 100.00%
03.03.02.07 JUNTAS ASFALTICAS m 66.56 6.54 435.30 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 66.56 435.30 100.00%
03.03.02.08 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 26.00 284.30 7,391.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 26.00 7,391.80 100.00%
03.03.03 AFORADOR PARSHALL - CANGARI (01 UND)
03.03.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.03.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.03.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.03.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.03.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.03.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.03.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.03.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.03.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.03.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.03.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.03.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.03.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.03.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.03.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.03.04 PASES PEATONALES - 05 UND
03.03.04.01 LIMPIEZA Y DESBROSE MANUAL m2 28.60 0.91 26.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 28.60 26.03 99.98%
03.03.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 22.00 4.54 99.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 22.00 99.88 100.00%
03.03.04.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 6.67 30.32 202.23 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.67 202.23 100.00%
03.03.04.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 0.99 21.92 21.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.99 21.70 100.00%
03.03.04.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 6.60 18.19 120.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.60 120.05 100.00%
03.03.04.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 2.64 331.36 874.79 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.64 874.79 100.00%
03.03.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 35.00 40.58 1,420.30 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 35.00 1,420.30 100.00%
03.03.04.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 156.07 6.55 1,022.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 156.07 1,022.26 100.00%
03.03.04.09 CONCRETO f´c=210Kg/cm2 m3 3.80 581.72 2,210.54 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.80 2,210.54 100.00%
03.03.04.10 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 15.00 18.64 279.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.00 279.60 100.00%
03.03.04.11 PINTURA LATEX 02 MANOS EN MUROS EXTERIORES m2 15.00 7.97 119.55 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.00 119.55 100.00%
03.03.05 POZA DESIPADORA DE ENERGIA - CANGARI (02 UND)
03.03.05.01 LIMPIEZA Y DESBROSE MANUAL m2 11.55 0.91 10.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.55 10.51 100.00%
03.03.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 4.88 4.54 22.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.88 22.16 99.98%
03.03.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 5.46 30.32 165.55 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.46 165.55 100.00%
03.03.05.04 REFINE, COMPACTACION Y NIVELACION m2 21.15 2.34 49.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 21.15 49.49 100.00%
03.03.05.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 6.83 18.19 124.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.83 124.24 100.00%
03.03.05.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 4.88 24.01 117.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.88 117.17 100.00%
03.03.05.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 15.42 40.58 625.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.42 625.74 100.00%
03.03.05.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 86.51 6.55 566.64 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 86.51 566.64 100.00%
03.03.05.09 CONCRETO f´c=210Kg/cm2 m3 2.15 581.72 1,250.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.15 1,250.70 100.00%
03.03.05.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 14.78 29.15 430.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.78 430.84 100.00%
03.03.05.11 JUNTAS ASFALTICAS m 5.40 6.54 35.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.40 35.32 99.99%
03.04 CANAL LATERAL 04 - CHIWA
03.04.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 04 - CHIWA
03.04.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,038.95 0.91 945.44 821.15 747.25 79.04% 0.00 0.00% 821.15 747.25 79.04% 217.80 198.20 20.96%
03.04.01.02 DEMOLICION MANUAL DE CONCRETO m3 2.05 60.65 124.33 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.05 124.33 100.00%
03.04.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.25 9,074.25 2,268.56 0.1 907.43 40.00% 0.00 0.00% 0.1 907.43 40.00% 0.15 1,361.14 60.00%
03.04.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 104.72 30.32 3,175.11 65.52 1,986.57 62.57% 0.00 0.00% 65.52 1,986.57 62.57% 39.20 1,188.54 37.43%
03.04.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 3.08 20.22 62.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.08 62.28 100.00%
03.04.01.06 REFINE, COMPACTACION Y NIVELACION m2 436.60 2.34 1,021.64 448.3 1,049.02 102.68% 0.00 0.00% 448.3 1,049.02 102.68% -11.70 -27.38 -2.68%
03.04.01.07 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 3.80 35.25 133.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.80 133.95 100.00%
03.04.01.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 253.20 40.58 10,274.86 131.81 5,348.85 52.06% 0.00 0.00% 131.81 5,348.85 52.06% 121.39 4,926.01 47.94%
03.04.01.09 CONCRETO f´c=175Kg/cm2 m3 37.28 557.52 20,784.35 33.59 18,727.10 90.10% 0.00 0.00% 33.59 18,727.10 90.10% 3.69 2,057.25 9.90%
03.04.01.10 JUNTAS ASFALTICAS m 205.48 6.54 1,343.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 205.48 1,343.84 100.00%
03.04.01.11 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 47.34 25.96 1,228.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 47.34 1,228.95 100.00%
03.04.01.12 CURADO DE CONCRETO m2 184.10 0.49 90.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 184.10 90.21 100.00%
03.04.02 TOMA LATERAL TIPO I - CHIWA (15 UND)
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.04.02.01 LIMPIEZA Y DESBROSE MANUAL m2 45.00 0.91 40.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 45.00 40.95 100.00%
03.04.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 28.50 4.54 129.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 28.50 129.39 100.00%
03.04.02.03 DEMOLICION MANUAL DE CONCRETO m3 1.22 60.65 73.99 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.22 73.99 100.00%
03.04.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 3.83 30.32 116.13 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.83 116.13 100.00%
03.04.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 4.93 20.22 99.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.93 99.68 100.00%
03.04.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 49.57 56.94 2,822.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 49.57 2,822.52 100.00%
03.04.02.07 CONCRETO f´c=175Kg/cm2 m3 4.18 557.52 2,330.43 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.18 2,330.43 100.00%
03.04.02.08 JUNTAS ASFALTICAS m 38.40 6.54 251.14 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 38.40 251.14 100.00%
03.04.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 15.00 284.30 4,264.50 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.00 4,264.50 100.00%
03.04.03 AFORADOR PARSHALL - CHIWA CL-04 (01 UND)
03.04.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.04.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.04.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.04.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.04.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.04.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.04.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.04.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.04.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.04.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.04.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.04.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.04.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.04.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.04.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.05 CANAL LATERAL 05 - CHIWA
03.05.01 CONSTRUCCION DEL CANAL LATERAL 05 - CHIWA (L=377M.)
03.05.01.01 LIMPIEZA Y DESBROSE MANUAL m2 600.60 0.91 546.55 569.25 518.02 94.78% 0.00 0.00% 569.25 518.02 94.78% 31.35 28.53 5.22%
03.05.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.25 9,074.25 2,268.56 0.15 1,361.14 60.00% 0.00 0.00% 0.15 1,361.14 60.00% 0.10 907.43 40.00%
03.05.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 193.58 30.32 5,869.35 193.58 5,869.35 100.00% 0.00 0.00% 193.58 5,869.35 100.00% 0.00 0.00 0.00%
03.05.01.04 REFINE, COMPACTACION Y NIVELACION m2 538.72 2.34 1,260.60 455.4 1,065.64 84.53% 0.00 0.00% 455.4 1,065.64 84.53% 83.32 194.97 15.47%
03.05.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 309.40 40.58 12,555.45 7.36 298.67 2.38% 0.00 0.00% 7.36 298.67 2.38% 302.04 12,256.78 97.62%
03.05.01.06 CONCRETO f´c=175Kg/cm2 m3 45.86 557.52 25,567.87 33.59 18,727.10 73.24% 0.00 0.00% 33.59 18,727.10 73.24% 12.27 6,840.77 26.76%
03.05.01.07 JUNTAS ASFALTICAS m 254.80 6.54 1,666.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 254.80 1,666.39 100.00%
03.05.01.08 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 32.76 25.96 850.45 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 32.76 850.45 100.00%
03.05.01.09 CURADO DE CONCRETO m2 254.80 0.49 124.85 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 254.80 124.85 100.00%
03.05.02 TOMA LATERAL TIPO I - CHIWA (12 UND)
03.05.02.01 LIMPIEZA Y DESBROSE MANUAL m2 36.00 0.91 32.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 36.00 32.76 100.00%
03.05.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 22.80 4.54 103.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 22.80 103.51 100.00%
03.05.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 3.06 30.32 92.78 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.06 92.78 100.00%
03.05.02.04 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 39.65 56.94 2,257.67 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 39.65 2,257.67 100.00%
03.05.02.05 CONCRETO f´c=175Kg/cm2 m3 3.49 557.52 1,945.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.49 1,945.74 100.00%
03.05.02.06 JUNTAS ASFALTICAS m 30.72 6.54 200.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.72 200.91 100.00%
03.05.02.07 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 12.00 284.30 3,411.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.00 3,411.60 100.00%
03.05.03 AFORADOR PARSHALL - CHIWA CL-05 (01 UND)
03.05.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.05.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.05.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.05.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.05.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.05.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.05.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.05.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.05.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.05.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.05.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.05.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.05.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.05.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.05.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.06 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 06 - VIRU VIRU
03.06.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 06 (SUBLATERAL 02 - 06 Y 01 - 06) VIRU VIRU.
03.06.01.01 LIMPIEZA Y DESBROSE MANUAL m2 2,535.23 0.91 2,307.06 1774.66 1,614.94 70.00% 0.00 0.00% 1774.66 1,614.94 70.00% 760.57 692.12 30.00%
03.06.01.02 DEMOLICION MANUAL DE CONCRETO m3 3.81 60.65 231.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.81 231.08 100.00%
03.06.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.50 9,074.25 4,537.13 0.05 453.71 10.00% 0.00 0.00% 0.05 453.71 10.00% 0.45 4,083.41 90.00%
03.06.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 48.82 30.32 1,480.22 4.05 122.80 8.30% 0.00 0.00% 4.05 122.80 8.30% 44.77 1,357.43 91.70%
03.06.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 5.71 20.22 115.46 5.06 102.31 88.61% 0.00 0.00% 5.06 102.31 88.61% 0.65 13.14 11.38%
03.06.01.06 REFINE, COMPACTACION Y NIVELACION m2 343.98 2.34 804.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 343.98 804.91 100.00%
03.06.01.07 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 15.00 35.25 528.75 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.00 528.75 100.00%
03.06.01.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 776.05 40.58 31,492.11 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 776.05 31,492.11 100.00%
03.06.01.09 CONCRETO f´c=175Kg/cm2 m3 33.26 557.52 18,543.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 33.26 18,543.12 100.00%
03.06.01.10 JUNTAS ASFALTICAS m 168.41 6.54 1,101.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 168.41 1,101.40 100.00%
03.06.01.11 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 32.04 25.96 831.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 32.04 831.76 100.00%
03.06.01.12 CURADO DE CONCRETO m2 249.20 0.49 122.11 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 249.20 122.11 100.00%
03.06.02 TOMA LATERAL TIPO I - VIRU VIRU (24 UND)
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.06.02.01 LIMPIEZA Y DESBROSE MANUAL m2 72.00 0.91 65.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 72.00 65.52 100.00%
03.06.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 45.60 4.54 207.02 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 45.60 207.02 100.00%
03.06.02.03 DEMOLICION MANUAL DE CONCRETO m3 2.15 60.65 130.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.15 130.40 100.00%
03.06.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 6.13 30.32 185.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.13 185.86 100.00%
03.06.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 7.92 20.22 160.14 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.92 160.14 100.00%
03.06.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 78.53 56.94 4,471.50 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 78.53 4,471.50 100.00%
03.06.02.07 CONCRETO f´c=175Kg/cm2 m3 6.98 557.52 3,891.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.98 3,891.49 100.00%
03.06.02.08 JUNTAS ASFALTICAS m 61.44 6.54 401.82 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 61.44 401.82 100.00%
03.06.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 24.00 284.30 6,823.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 24.00 6,823.20 100.00%
03.06.03 TOMA LATERAL TIPO II - VIRU VIRU (01 UND)
03.06.03.01 LIMPIEZA Y DESBROSE MANUAL m2 2.00 0.91 1.82 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 1.82 100.00%
03.06.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 4.54 6.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.50 6.81 100.00%
03.06.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 60.65 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.09 5.46 99.97%
03.06.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.51 30.32 15.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.51 15.46 100.02%
03.06.03.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.65 20.22 13.14 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.65 13.14 100.02%
03.06.03.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 6.14 56.94 349.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.14 349.61 100.00%
03.06.03.07 CONCRETO f´c=175Kg/cm2 m3 0.58 557.52 323.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.58 323.36 100.00%
03.06.03.08 JUNTAS ASFALTICAS m 2.56 6.54 16.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.56 16.74 100.01%
03.06.03.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 2.00 284.30 568.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 568.60 100.00%
03.06.04 AFORADOR PARSHALL - VIRU VIRU (01 UND)
03.06.04.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.06.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.06.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.06.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.06.04.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.06.04.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.06.04.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.06.04.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.06.04.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.06.04.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.06.04.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.06.04.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.06.04.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.06.04.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.06.04.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.06.05 PASES PEATONALES - VIRU VIRU (02 UND)
03.06.05.01 LIMPIEZA Y DESBROSE MANUAL m2 11.44 0.91 10.41 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.44 10.41 100.00%
03.06.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 8.80 4.54 39.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.80 39.95 100.01%
03.06.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.51 30.32 76.10 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.51 76.10 100.00%
03.06.05.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 0.40 21.92 8.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.40 8.77 99.98%
03.06.05.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 2.64 18.19 48.02 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.64 48.02 100.00%
03.06.05.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 1.06 331.36 351.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.06 351.24 100.00%
03.06.05.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.00 40.58 568.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.00 568.12 100.00%
03.06.05.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 62.43 6.55 408.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 62.43 408.92 100.00%
03.06.05.09 CONCRETO f´c=210Kg/cm2 m3 1.52 581.72 884.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.52 884.21 100.00%
03.06.05.10 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 6.00 18.64 111.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 111.84 100.00%
03.06.05.11 PINTURA LATEX 02 MANOS EN MUROS EXTERIORES m2 6.00 7.97 47.82 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 47.82 100.00%
03.06.06 POZA DESIPADORA DE ENERGIA - VIRU VIRU (01 UND)
03.06.06.01 LIMPIEZA Y DESBROSE MANUAL m2 5.78 0.91 5.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.78 5.26 100.00%
03.06.06.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 2.44 4.54 11.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 11.08 99.98%
03.06.06.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.73 30.32 82.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.73 82.77 100.00%
03.06.06.04 REFINE, COMPACTACION Y NIVELACION m2 10.58 2.34 24.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.58 24.76 99.99%
03.06.06.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 3.41 20.22 68.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.41 68.95 100.00%
03.06.06.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 2.44 24.01 58.58 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 58.58 100.01%
03.06.06.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 7.71 40.58 312.87 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.71 312.87 100.00%
03.06.06.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 43.25 6.55 283.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 43.25 283.29 100.00%
03.06.06.09 CONCRETO f´c=210Kg/cm2 m3 1.08 581.72 628.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.08 628.26 100.00%
03.06.06.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 7.39 29.15 215.42 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.39 215.42 100.00%
03.06.06.11 JUNTAS ASFALTICAS m 2.70 6.54 17.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.70 17.66 99.99%
03.06.07 PARTIDOR DE CAUDAL TIPO I - VIRU VIRU (01 UND)
03.06.07.01 LIMPIEZA Y DESBROSE MANUAL m2 2.25 0.91 2.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.25 2.05 99.88%
03.06.07.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.43 4.54 6.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.43 6.49 100.03%
03.06.07.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 60.65 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.09 5.46 99.97%
03.06.07.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.26 30.32 7.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.26 7.88 100.04%
03.06.07.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.32 20.22 6.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.32 6.47 100.01%
03.06.07.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 3.50 56.94 199.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.50 199.29 100.00%
03.06.07.07 CONCRETO f´c=175Kg/cm2 m3 0.29 557.52 161.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.29 161.68 100.00%
03.06.07.08 JUNTAS ASFALTICAS m 4.00 6.54 26.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 26.16 100.00%
03.06.07.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.65m. und 2.00 316.20 632.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 632.40 100.00%
03.07 MEJORAMIENTO DEL CANAL LATERAL 07 - VIRU VIRU
03.07.01 MEJORAMIENTO DEL CANAL LATERAL 07 - VIRU VIRU.
03.07.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,137.00 0.91 1,034.67 543 494.13 47.76% 0.00 0.00% 543 494.13 47.76% 594.00 540.54 52.24%
03.07.01.02 DEMOLICION MANUAL DE CONCRETO m3 4.79 60.65 290.51 1.1 66.72 22.96% 0.00 0.00% 1.1 66.72 22.96% 3.69 223.80 77.04%
03.07.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.05 9,074.25 453.71 0.05 453.71 100.00% 0.00 0.00% 0.05 453.71 100.00% 0.00 0.00 0.00%
03.07.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 7.19 20.22 145.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.19 145.38 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.07.01.05 REFINE, COMPACTACION Y NIVELACION m2 686.96 2.34 1,607.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 686.96 1,607.49 100.00%
03.07.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 399.50 40.58 16,211.71 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 399.50 16,211.71 100.00%
03.07.01.07 CONCRETO f´c=175Kg/cm2 m3 59.56 557.52 33,205.89 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 59.56 33,205.89 100.00%
03.07.01.08 JUNTAS ASFALTICAS m 343.68 6.54 2,247.67 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 343.68 2,247.67 100.00%
03.07.01.09 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 32.40 25.96 841.10 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 32.40 841.10 100.00%
03.07.01.10 CURADO DE CONCRETO m2 252.00 0.49 123.48 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 252.00 123.48 100.00%
03.07.02 TOMA LATERAL TIPO I - VIRU VIRU (03 UND)
03.07.02.01 LIMPIEZA Y DESBROSE MANUAL m2 9.00 0.91 8.19 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 8.19 100.00%
03.07.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 5.70 4.54 25.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.70 25.88 99.99%
03.07.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.28 60.65 16.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.28 16.98 100.01%
03.07.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.77 30.32 23.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.77 23.35 99.98%
03.07.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.99 20.22 20.02 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.99 20.02 99.99%
03.07.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 9.91 56.94 564.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.91 564.28 100.00%
03.07.02.07 CONCRETO f´c=175Kg/cm2 m3 0.87 557.52 485.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.87 485.04 100.00%
03.07.02.08 JUNTAS ASFALTICAS m 7.68 6.54 50.23 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.68 50.23 99.99%
03.07.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 3.00 284.30 852.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 852.90 100.00%
03.07.03 AFORADOR PARSHALL - VIRU VIRU (01 UND)
03.07.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.07.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.07.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.07.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.07.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.07.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.07.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.07.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.07.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.07.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.07.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.07.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.07.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.07.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.07.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.07.04 POZA DESIPADORA DE ENERGIA - VIRU VIRU (03 UND)
03.07.04.01 LIMPIEZA Y DESBROSE MANUAL m2 17.33 0.91 15.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.33 15.77 100.00%
03.07.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 7.32 4.54 33.23 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.32 33.23 100.01%
03.07.04.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 8.19 30.32 248.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.19 248.32 100.00%
03.07.04.04 REFINE, COMPACTACION Y NIVELACION m2 31.73 2.34 74.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 31.73 74.25 100.00%
03.07.04.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 10.24 20.22 207.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.24 207.05 100.00%
03.07.04.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 7.32 24.01 175.75 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.32 175.75 100.00%
03.07.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 23.13 40.58 938.62 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.13 938.62 100.00%
03.07.04.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 129.76 6.55 849.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 129.76 849.93 100.00%
03.07.04.09 CONCRETO f´c=210Kg/cm2 m3 3.23 581.72 1,878.96 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.23 1,878.96 100.00%
03.07.04.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 22.17 29.15 646.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 22.17 646.26 100.00%
03.07.04.11 JUNTAS ASFALTICAS m 8.10 6.54 52.97 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.10 52.97 100.01%
03.07.05 CAJAS DE INSPECCION
03.07.05.01 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 22.50 4.54 102.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 22.50 102.15 100.00%
03.07.05.02 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.25 30.32 68.22 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.25 68.22 100.00%
03.07.05.03 REFINE, COMPACTACION Y NIVELACION m2 11.25 2.34 26.33 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.25 26.33 99.98%
03.07.05.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 50.35 85.82 4,321.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 50.35 4,321.04 100.00%
03.07.05.05 CONCRETO f´c=175Kg/cm2 m3 5.05 557.52 2,815.48 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.05 2,815.48 100.00%
03.07.05.06 ACERO FY=4200 KG/CM2, GRADO 60 kg 59.00 6.55 386.45 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 59.00 386.45 100.00%
03.07.05.07 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 25.18 29.15 734.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 25.18 734.00 100.00%
03.07.06 CANAL ENTUBADO DEL KM 0+000 A 0+370
03.07.06.01 LIMPIEZA Y DESBROSE MANUAL m2 740.00 0.91 673.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 740.00 673.40 100.00%
03.07.06.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 370.00 4.54 1,679.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 370.00 1,679.80 100.00%
03.07.06.03 EXCAVACION EN METERIAL SUELTO m3 111.00 29.59 3,284.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 111.00 3,284.49 100.00%
03.07.06.04 REFINE, COMPACTACION Y NIVELACION m2 740.00 2.34 1,731.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 740.00 1,731.60 100.00%
03.07.06.05 PREPARACION Y TENDIDO DE CAMA DE APOYO m3 22.10 67.39 1,489.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 22.10 1,489.32 100.00%
03.07.06.06 RELLENO Y COMPACTACIÓN CON MATERIAL SELECCIONADO m3 33.30 44.20 1,471.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 33.30 1,471.86 100.00%
03.07.06.07 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 101.01 18.19 1,837.37 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 101.01 1,837.37 100.00%
03.07.06.08 SUMINISTRO E INST. TUBERIA PVC-UF/S-25 DIAM 8" m 370.00 200.17 74,062.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 370.00 74,062.90 100.00%
03.07.06.09 PRUEBA HIDRÁULICA EN TUBERIA PVC UF 8" m 370.00 3.22 1,191.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 370.00 1,191.40 100.00%
03.08 CANAL LATERAL 08 - CHACCO
03.08.01 CONSTRUCCION DEL CANAL LATERAL 08 - CHACCO (L=384m.)
03.08.01.01 LIMPIEZA Y DESBROSE MANUAL m2 633.60 0.91 576.58 633.6 576.58 100.00% 0.00 0.00% 633.6 576.58 100.00% 0.00 0.00 0.00%
03.08.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.25 9,074.25 2,268.56 0.15 1,361.14 60.00% 0.00 0.00% 0.15 1,361.14 60.00% 0.10 907.43 40.00%
03.08.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 270.01 30.32 8,186.70 270.01 8,186.70 100.00% 0.00 0.00% 270.01 8,186.70 100.00% 0.00 0.00 0.00%
03.08.01.04 REFINE, COMPACTACION Y NIVELACION m2 506.88 2.34 1,186.10 506.88 1,186.10 100.00% 0.00 0.00% 506.88 1,186.10 100.00% 0.00 0.00 0.00%
03.08.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 326.40 40.58 13,245.31 6.14 249.16 1.88% 0.00 0.00% 6.14 249.16 1.88% 320.26 12,996.15 98.12%
03.08.01.06 CONCRETO f´c=175Kg/cm2 m3 48.38 557.52 26,972.82 37.82 21,085.41 78.17% 0.00 0.00% 37.82 21,085.41 78.17% 10.56 5,887.41 21.83%
03.08.01.07 JUNTAS ASFALTICAS m 268.80 6.54 1,757.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 268.80 1,757.95 100.00%
03.08.01.08 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 34.56 25.96 897.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 34.56 897.18 100.00%
03.08.01.09 CURADO DE CONCRETO m2 268.80 0.49 131.71 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 268.80 131.71 100.00%
03.08.02 TOMA LATERAL TIPO I - CHACCO (04 UND)
03.08.02.01 LIMPIEZA Y DESBROSE MANUAL m2 12.00 0.91 10.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.00 10.92 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.08.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 7.60 4.54 34.50 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.60 34.50 100.01%
03.08.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.02 30.32 30.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.02 30.93 99.99%
03.08.02.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 1.28 18.19 23.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.28 23.28 100.01%
03.08.02.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 13.22 56.94 752.75 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.22 752.75 100.00%
03.08.02.06 CONCRETO f´c=175Kg/cm2 m3 1.16 557.52 646.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.16 646.72 100.00%
03.08.02.07 JUNTAS ASFALTICAS m 10.24 6.54 66.97 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.24 66.97 100.00%
03.08.02.08 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 4.00 284.30 1,137.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 1,137.20 100.00%
03.08.03 AFORADOR PARSHALL - CHACCO (01 UND)
03.08.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.08.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.08.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.08.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.08.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.08.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.08.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.08.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.08.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.08.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.08.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.08.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.08.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.08.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.08.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.08.04 POZA DESIPADORA DE ENERGIA - CHACCO (01 UND)
03.08.04.01 LIMPIEZA Y DESBROSE MANUAL m2 5.78 0.91 5.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.78 5.26 100.00%
03.08.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 2.44 4.54 11.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 11.08 99.98%
03.08.04.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.73 30.32 82.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.73 82.77 100.00%
03.08.04.04 REFINE, COMPACTACION Y NIVELACION m2 10.58 2.34 24.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.58 24.76 99.99%
03.08.04.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 3.41 18.19 62.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.41 62.03 100.00%
03.08.04.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 2.44 24.01 58.58 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 58.58 100.01%
03.08.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 7.71 40.58 312.87 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.71 312.87 100.00%
03.08.04.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 43.25 6.55 283.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 43.25 283.29 100.00%
03.08.04.09 CONCRETO f´c=210Kg/cm2 m3 1.08 581.72 628.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.08 628.26 100.00%
03.08.04.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 7.39 29.15 215.42 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.39 215.42 100.00%
03.08.04.11 JUNTAS ASFALTICAS m 2.70 6.54 17.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.70 17.66 99.99%
03.09 CANAL LATERAL 09 - CHACCO
03.09.01 CONSTRUCCION DEL CANAL LATERAL 09 (SUBLATERAL 01 - 09, 02 - 09 Y ,3-09) - CHACCO.
03.09.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,498.02 0.91 1,363.20 1498.02 1,363.20 100.00% 0.00 0.00% 1498.02 1,363.20 100.00% 0.00 0.00 0.00%
03.09.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.50 9,074.25 4,537.13 0.25 2,268.56 50.00% 0.00 0.00% 0.25 2,268.56 50.00% 0.25 2,268.56 50.00%
03.09.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 578.70 30.32 17,546.18 500.7 15,181.22 86.52% 0.00 0.00% 500.7 15,181.22 86.52% 78.00 2,364.96 13.48%
03.09.01.04 REFINE, COMPACTACION Y NIVELACION m2 1,198.41 2.34 2,804.28 1119.21 2,618.95 93.39% 0.00 0.00% 1119.21 2,618.95 93.39% 79.20 185.33 6.61%
03.09.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 771.80 40.58 31,319.64 14.53 589.63 1.88% 0.00 0.00% 14.53 589.63 1.88% 757.27 30,730.02 98.12%
03.09.01.06 CONCRETO f´c=175Kg/cm2 m3 114.39 557.52 63,774.71 56.55 31,527.76 49.44% 0.00 0.00% 56.55 31,527.76 49.44% 57.84 32,246.96 50.56%
03.09.01.07 JUNTAS ASFALTICAS m 635.60 6.54 4,156.82 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 635.60 4,156.82 100.00%
03.09.01.08 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 81.71 25.96 2,121.19 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 81.71 2,121.19 100.00%
03.09.01.09 CURADO DE CONCRETO m2 635.52 0.49 311.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 635.52 311.40 100.00%
03.09.02 TOMA LATERAL TIPO I - CHACCO (09 UND)
03.09.02.01 LIMPIEZA Y DESBROSE MANUAL m2 27.00 0.91 24.57 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.00 24.57 100.00%
03.09.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 17.10 4.54 77.63 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.10 77.63 100.01%
03.09.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.30 30.32 69.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.30 69.74 99.99%
03.09.02.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 2.87 18.19 52.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.87 52.21 99.99%
03.09.02.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 29.74 56.94 1,693.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 29.74 1,693.40 100.00%
03.09.02.06 CONCRETO f´c=175Kg/cm2 m3 2.62 557.52 1,460.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.62 1,460.70 100.00%
03.09.02.07 JUNTAS ASFALTICAS m 23.04 6.54 150.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.04 150.68 100.00%
03.09.02.08 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 9.00 284.30 2,558.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 2,558.70 100.00%
03.09.03 TOMA LATERAL TIPO II - CHACCO (02 UND)
03.09.03.01 LIMPIEZA Y DESBROSE MANUAL m2 8.00 0.91 7.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 7.28 100.00%
03.09.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 3.00 4.54 13.62 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 13.62 100.00%
03.09.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.19 60.65 11.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.19 11.52 100.03%
03.09.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.02 30.32 30.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.02 30.93 99.99%
03.09.03.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 1.30 18.19 23.65 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.30 23.65 99.99%
03.09.03.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 12.28 56.94 699.22 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.28 699.22 100.00%
03.09.03.07 CONCRETO f´c=175Kg/cm2 m3 1.11 557.52 618.85 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.11 618.85 100.00%
03.09.03.08 JUNTAS ASFALTICAS m 5.12 6.54 33.48 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.12 33.48 100.01%
03.09.03.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 4.00 284.30 1,137.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 1,137.20 100.00%
03.09.04 AFORADOR PARSHALL - CHACCO (01 UND)
03.09.04.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.09.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.09.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.09.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.09.04.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.09.04.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.09.04.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.09.04.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.09.04.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.09.04.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.09.04.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.09.04.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.09.04.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.09.04.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.09.04.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.09.05 POZA DESIPADORA DE ENERGIA - CHACCO (01 UND)
03.09.05.01 LIMPIEZA Y DESBROSE MANUAL m2 5.78 0.91 5.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.78 5.26 100.00%
03.09.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 2.44 4.54 11.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 11.08 99.98%
03.09.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.73 30.32 82.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.73 82.77 100.00%
03.09.05.04 REFINE, COMPACTACION Y NIVELACION m2 10.58 2.34 24.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.58 24.76 99.99%
03.09.05.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 3.41 18.19 62.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.41 62.03 100.00%
03.09.05.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 2.44 24.01 58.58 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 58.58 100.01%
03.09.05.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 7.71 40.58 312.87 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.71 312.87 100.00%
03.09.05.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 43.25 6.55 283.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 43.25 283.29 100.00%
03.09.05.09 CONCRETO f´c=210Kg/cm2 m3 1.08 581.72 628.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.08 628.26 100.00%
03.09.05.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 7.39 29.15 215.42 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.39 215.42 100.00%
03.09.05.11 JUNTAS ASFALTICAS m 2.70 6.54 17.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.70 17.66 99.99%
03.09.06 PARTIDOR DE CAUDAL TIPO II - CHACCO (01 UND)
03.09.06.01 LIMPIEZA Y DESBROSE MANUAL m2 2.25 0.91 2.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.25 2.05 99.88%
03.09.06.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 4.54 6.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.50 6.81 100.00%
03.09.06.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 60.65 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.09 5.46 99.97%
03.09.06.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.26 30.32 7.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.26 7.88 100.04%
03.09.06.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.32 20.22 6.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.32 6.47 100.01%
03.09.06.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 5.54 56.94 315.45 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.54 315.45 100.00%
03.09.06.07 CONCRETO f´c=175Kg/cm2 m3 0.38 557.52 211.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 211.86 100.00%
03.09.06.08 JUNTAS ASFALTICAS m 4.00 6.54 26.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 26.16 100.00%
03.09.06.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.65m. und 3.00 316.20 948.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 948.60 100.00%
03.10 CANAL LATERAL 10 - CHACCO
03.10.01 CONSTRUCCION DEL CANAL LATERAL 10 - CHACCO (L=236m.)
03.10.01.01 LIMPIEZA Y DESBROSE MANUAL m2 396.00 0.91 360.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 396.00 360.36 100.00%
03.10.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.50 9,074.25 4,537.13 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 4,537.13 100.00%
03.10.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 301.37 30.32 9,137.54 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 301.37 9,137.54 100.00%
03.10.01.04 REFINE, COMPACTACION Y NIVELACION m2 316.80 2.34 741.31 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 316.80 741.31 100.00%
03.10.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 204.00 40.58 8,278.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 204.00 8,278.32 100.00%
03.10.01.06 CONCRETO f´c=175Kg/cm2 m3 30.24 557.52 16,859.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.24 16,859.40 100.00%
03.10.01.07 JUNTAS ASFALTICAS m 168.00 6.54 1,098.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 168.00 1,098.72 100.00%
03.10.01.08 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 21.60 25.96 560.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 21.60 560.74 100.00%
03.10.01.09 CURADO DE CONCRETO m2 168.00 0.49 82.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 168.00 82.32 100.00%
03.10.02 TOMA LATERAL TIPO I - CHACCO (03 UND)
03.10.02.01 LIMPIEZA Y DESBROSE MANUAL m2 9.00 0.91 8.19 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 8.19 100.00%
03.10.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 5.70 4.54 25.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.70 25.88 99.99%
03.10.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.77 30.32 23.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.77 23.35 99.98%
03.10.02.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 0.96 18.19 17.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.96 17.46 100.01%
03.10.02.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 9.91 56.94 564.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.91 564.28 100.00%
03.10.02.06 CONCRETO f´c=175Kg/cm2 m3 0.87 557.52 485.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.87 485.04 100.00%
03.10.02.07 JUNTAS ASFALTICAS m 7.68 6.54 50.23 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.68 50.23 99.99%
03.10.02.08 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 3.00 284.30 852.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 852.90 100.00%
03.10.03 AFORADOR PARSHALL - CHACCO (01 UND)
03.10.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.10.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.10.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.10.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.10.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.10.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.10.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.10.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.10.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.10.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.10.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.10.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.10.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.10.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.10.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.10.04 POZA DISIPADORA DE ENERGIA - CHACCO (01 UND)
03.10.04.01 LIMPIEZA Y DESBROSE MANUAL m2 5.78 0.91 5.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.78 5.26 100.00%
03.10.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 2.44 4.54 11.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 11.08 99.98%
03.10.04.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.73 30.32 82.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.73 82.77 100.00%
03.10.04.04 REFINE, COMPACTACION Y NIVELACION m2 10.58 2.34 24.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.58 24.76 99.99%
03.10.04.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 3.41 18.19 62.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.41 62.03 100.00%
03.10.04.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 2.44 24.01 58.58 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 58.58 100.01%
03.10.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 7.71 40.58 312.87 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.71 312.87 100.00%
03.10.04.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 43.25 6.55 283.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 43.25 283.29 100.00%
03.10.04.09 CONCRETO f´c=210Kg/cm2 m3 1.08 581.72 628.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.08 628.26 100.00%
03.10.04.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 7.39 29.15 215.42 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.39 215.42 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.10.04.11 JUNTAS ASFALTICAS m 2.70 6.54 17.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.70 17.66 99.99%
03.11 CANAL LATERAL 11 - CHACCO
03.11.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 11 - CHACCO
03.11.01.01 LIMPIEZA Y DESBROSE MANUAL m2 607.98 0.91 553.26 607.98 553.26 100.00% 0.00 0.00% 607.98 553.26 100.00% 0.00 0.00 0.00%
03.11.01.02 DEMOLICION MANUAL DE CONCRETO m3 0.36 60.65 21.83 1.18 71.57 327.84% 0.00 0.00% 1.18 71.57 327.84% -0.82 -49.73 -227.82%
03.11.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.25 9,074.25 2,268.56 0.15 1,361.14 60.00% 0.00 0.00% 0.15 1,361.14 60.00% 0.10 907.43 40.00%
03.11.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 189.85 30.32 5,756.25 189.95 5,759.28 100.05% 0.00 0.00% 189.95 5,759.28 100.05% -0.10 -3.03 -0.05%
03.11.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.53 20.22 10.72 1.78 35.99 335.74% 0.00 0.00% 1.78 35.99 335.74% -1.25 -25.28 -235.77%
03.11.01.06 REFINE, COMPACTACION Y NIVELACION m2 403.53 2.34 944.26 394.48 923.08 97.76% 0.00 0.00% 394.48 923.08 97.76% 9.05 21.18 2.24%
03.11.01.07 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 0.96 35.25 33.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.96 33.84 100.00%
03.11.01.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 260.95 40.58 10,589.35 41.21 1,672.30 15.79% 0.00 0.00% 41.21 1,672.30 15.79% 219.74 8,917.05 84.21%
03.11.01.09 CONCRETO f´c=175Kg/cm2 m3 38.54 557.52 21,486.82 29.52 16,457.99 76.60% 0.00 0.00% 29.52 16,457.99 76.60% 9.02 5,028.83 23.40%
03.11.01.10 JUNTAS ASFALTICAS m 196.21 6.54 1,283.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 196.21 1,283.21 100.00%
03.11.01.11 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 27.59 25.96 716.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.59 716.24 100.00%
03.11.01.12 CURADO DE CONCRETO m2 306.60 0.49 150.23 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 306.60 150.23 100.00%
03.11.02 TOMA LATERAL TIPO I _SUBLATERAL 01-11 Y SUBLATERAL 03-11 DE CHACCO (07 UND)
03.11.02.01 LIMPIEZA Y DESBROSE MANUAL m2 21.00 0.91 19.11 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 21.00 19.11 100.00%
03.11.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 13.30 4.54 60.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.30 60.38 100.00%
03.11.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.79 30.32 54.27 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.79 54.27 100.01%
03.11.02.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 2.23 18.19 40.56 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.23 40.56 100.01%
03.11.02.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 23.13 56.94 1,317.02 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.13 1,317.02 100.00%
03.11.02.06 CONCRETO f´c=175Kg/cm2 m3 2.04 557.52 1,137.34 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.04 1,137.34 100.00%
03.11.02.07 JUNTAS ASFALTICAS m 17.92 6.54 117.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.92 117.20 100.00%
03.11.02.08 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 7.00 284.30 1,990.10 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.00 1,990.10 100.00%
03.11.03 AFORADOR PARSHALL - CHACCO (01 UND)
03.11.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.11.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.11.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.11.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.11.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.11.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.11.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.11.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.11.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.11.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.11.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.11.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.11.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.11.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.11.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.11.04 PARTIDOR DE CAUDAL TIPO II - CHACCO (01 UND)
03.11.04.01 LIMPIEZA Y DESBROSE MANUAL m2 2.25 0.91 2.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.25 2.05 99.88%
03.11.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 4.54 6.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.50 6.81 100.00%
03.11.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 60.65 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.09 5.46 99.97%
03.11.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.26 30.32 7.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.26 7.88 100.04%
03.11.04.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.32 20.22 6.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.32 6.47 100.01%
03.11.04.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 5.54 56.94 315.45 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.54 315.45 100.00%
03.11.04.07 CONCRETO f´c=175Kg/cm2 m3 0.42 557.52 234.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.42 234.16 100.00%
03.11.04.08 JUNTAS ASFALTICAS m 6.00 6.54 39.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 39.24 100.00%
03.11.04.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.65m. und 3.00 316.20 948.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 948.60 100.00%
03.11.05 POZA DESIPADORA DE ENERGIA (SUBLATERAL 01-11, 02-11 Y 03-11) (02 UND)
03.11.05.01 LIMPIEZA Y DESBROSE MANUAL m2 11.55 0.91 10.51 5.57 5.07 48.23% 0.00 0.00% 5.57 5.07 48.23% 5.98 5.44 51.78%
03.11.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 4.88 4.54 22.16 2.44 11.08 49.99% 0.00 0.00% 2.44 11.08 49.99% 2.44 11.08 49.99%
03.11.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 5.46 30.32 165.55 2.73 82.77 50.00% 0.00 0.00% 2.73 82.77 50.00% 2.73 82.77 50.00%
03.11.05.04 REFINE, COMPACTACION Y NIVELACION m2 21.15 2.34 49.49 10.58 24.76 50.02% 0.00 0.00% 10.58 24.76 50.02% 10.57 24.73 49.98%
03.11.05.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 6.83 18.19 124.24 3.41 62.03 49.93% 0.00 0.00% 3.41 62.03 49.93% 3.42 62.21 50.07%
03.11.05.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 4.88 24.01 117.17 2.43 58.34 49.79% 0.00 0.00% 2.43 58.34 49.79% 2.45 58.82 50.20%
03.11.05.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 15.42 40.58 625.74 7.71 312.87 50.00% 0.00 0.00% 7.71 312.87 50.00% 7.71 312.87 50.00%
03.11.05.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 86.51 6.55 566.64 43.28 283.48 50.03% 0.00 0.00% 43.28 283.48 50.03% 43.23 283.16 49.97%
03.11.05.09 CONCRETO f´c=210Kg/cm2 m3 2.15 581.72 1,250.70 1.07 622.44 49.77% 0.00 0.00% 1.07 622.44 49.77% 1.08 628.26 50.23%
03.11.05.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 14.78 29.15 430.84 7.39 215.42 50.00% 0.00 0.00% 7.39 215.42 50.00% 7.39 215.42 50.00%
03.11.05.11 JUNTAS ASFALTICAS m 5.40 6.54 35.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.40 35.32 99.99%
03.12 CANAL LATERAL 12 - CHACCO
03.12.01 MEJORAMIENTO DEL CANAL LATERAL 12 - CHACCO
03.12.01.01 LIMPIEZA Y DESBROSE MANUAL m2 3,061.17 0.91 2,785.66 2061.17 1,875.66 67.33% 0.00 0.00% 2061.17 1,875.66 67.33% 1,000.00 910.00 32.67%
03.12.01.02 DEMOLICION MANUAL DE CONCRETO m3 3.90 60.65 236.54 0.99 60.04 25.38% 0.00 0.00% 0.99 60.04 25.38% 2.91 176.49 74.61%
03.12.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.25 9,074.25 2,268.56 0.08 725.94 32.00% 0.00 0.00% 0.08 725.94 32.00% 0.17 1,542.62 68.00%
03.12.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 5.85 20.22 118.29 1.48 29.93 25.30% 0.00 0.00% 1.48 29.93 25.30% 4.37 88.36 74.70%
03.12.01.05 REFINE, COMPACTACION Y NIVELACION m2 133.32 2.34 311.97 46.2 108.11 34.65% 0.00 0.00% 46.2 108.11 34.65% 87.12 203.86 65.35%
03.12.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 88.74 40.58 3,601.07 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 88.74 3,601.07 100.00%
03.12.01.07 CONCRETO f´c=175Kg/cm2 m3 12.73 557.52 7,097.23 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.73 7,097.23 100.00%
03.12.01.08 JUNTAS ASFALTICAS m 65.28 6.54 426.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 65.28 426.93 100.00%
03.12.01.09 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 9.09 25.96 235.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.09 235.98 100.00%
03.12.01.10 CURADO DE CONCRETO m2 70.70 0.49 34.64 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 70.70 34.64 100.01%
03.12.02 TOMA LATERAL TIPO I CHACCO (09 UND)
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.12.02.01 LIMPIEZA Y DESBROSE MANUAL m2 27.00 0.91 24.57 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.00 24.57 100.00%
03.12.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 17.10 4.54 77.63 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.10 77.63 100.01%
03.12.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.84 60.65 50.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.84 50.95 99.99%
03.12.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.30 30.32 69.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.30 69.74 99.99%
03.12.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.97 20.22 60.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.97 60.05 100.01%
03.12.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 29.74 56.94 1,693.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 29.74 1,693.40 100.00%
03.12.02.07 CONCRETO f´c=175Kg/cm2 m3 2.62 557.52 1,460.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.62 1,460.70 100.00%
03.12.02.08 JUNTAS ASFALTICAS m 23.04 6.54 150.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.04 150.68 100.00%
03.12.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 9.00 284.30 2,558.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 2,558.70 100.00%
03.12.03 AFORADOR PARSHALL - CHACCO (01 UND)
03.12.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.12.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.12.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.12.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.12.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.12.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.12.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.12.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.12.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.12.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.12.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.12.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.12.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.12.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.12.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.12.04 REHABILITACION DE POZA DISIPADORA DE ENERGIA CL 12 - CHACCO (03 UND)
03.12.04.01 LIMPIEZA Y DESBROSE MANUAL m2 17.33 0.91 15.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.33 15.77 100.00%
03.12.04.02 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 0.98 15.16 14.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.98 14.86 99.98%
03.12.04.03 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 3.90 100.78 393.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.90 393.04 100.00%
03.12.04.04 SELLADO DE GRIETAS Y FISURAS ep=2cm m 6.00 50.51 303.06 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 303.06 100.00%
03.13 CANAL LATERAL 13 - AZANGARO GRANDE
03.13.01 MEJORAMIENTO CANAL LATERAL 13 - AZANGARO GRANDE
03.13.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,714.00 0.91 1,559.74 1714 1,559.74 100.00% 0.00 0.00% 1714 1,559.74 100.00% 0.00 0.00 0.00%
03.13.01.02 DEMOLICION MANUAL DE CONCRETO m3 10.00 60.65 606.50 25.51 1,547.18 255.10% 0.00 0.00% 25.51 1,547.18 255.10% -15.51 -940.68 -155.10%
03.13.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.25 9,074.25 2,268.56 0.1 907.43 40.00% 0.00 0.00% 0.1 907.43 40.00% 0.15 1,361.14 60.00%
03.13.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 15.00 20.22 303.30 38.27 773.82 255.13% 0.00 0.00% 38.27 773.82 255.13% -23.27 -470.52 -155.13%
03.13.01.05 REFINE, COMPACTACION Y NIVELACION m2 341.88 2.34 800.00 260.04 608.49 76.06% 0.00 0.00% 260.04 608.49 76.06% 81.84 191.51 23.94%
03.13.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 221.00 40.58 8,968.18 36.7 1,489.29 16.61% 0.00 0.00% 36.7 1,489.29 16.61% 184.30 7,478.89 83.39%
03.13.01.07 CONCRETO f´c=175Kg/cm2 m3 32.63 557.52 18,191.88 25.51 14,222.34 78.18% 0.00 0.00% 25.51 14,222.34 78.18% 7.12 3,969.54 21.82%
03.13.01.08 JUNTAS ASFALTICAS m 166.40 6.54 1,088.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 166.40 1,088.26 100.00%
03.13.01.09 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 23.31 25.96 605.13 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.31 605.13 100.00%
03.13.01.10 CURADO DE CONCRETO m2 181.30 0.49 88.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 181.30 88.84 100.00%
03.13.02 TOMA LATERAL TIPO I - AZANGARO GRANDE (11 UND)
03.13.02.01 LIMPIEZA Y DESBROSE MANUAL m2 33.00 0.91 30.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 33.00 30.03 100.00%
03.13.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 20.90 4.54 94.89 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 20.90 94.89 100.00%
03.13.02.03 DEMOLICION MANUAL DE CONCRETO m3 1.03 60.65 62.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.03 62.47 100.00%
03.13.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.81 30.32 85.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.81 85.20 100.00%
03.13.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 3.64 20.22 73.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.64 73.60 100.00%
03.13.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 36.35 56.94 2,069.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 36.35 2,069.77 100.00%
03.13.02.07 CONCRETO f´c=175Kg/cm2 m3 3.20 557.52 1,784.06 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.20 1,784.06 100.00%
03.13.02.08 JUNTAS ASFALTICAS m 28.16 6.54 184.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 28.16 184.17 100.00%
03.13.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 11.00 284.30 3,127.30 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.00 3,127.30 100.00%
03.13.03 AFORADOR PARSHALL - AZANGARO (01 UND)
03.13.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.13.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.13.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.13.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.13.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.13.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.13.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.13.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.13.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.13.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.13.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.13.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.13.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.13.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.13.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.13.04 REHABILITACION DE POZA DISIPADORA DE ENERGIA CL 13 - AZANGARO GRANDE (01 UND)
03.13.04.01 LIMPIEZA Y DESBROSE MANUAL m2 5.78 0.91 5.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.78 5.26 100.00%
03.13.04.02 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 0.33 15.16 5.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.33 5.00 100.06%
03.13.04.03 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 1.30 100.78 131.01 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.30 131.01 100.00%
03.13.04.04 SELLADO DE GRIETAS Y FISURAS ep=2cm m 2.00 50.51 101.02 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 101.02 100.00%
03.14 CANAL LATERAL 14 - AZANGARO 1
03.14.01 MEJORAMIENTO DEL CANAL LATERAL 14, SUBLATERAL (01 - 14, 02-01-14, 02-14, 01-01 -14) AZANGARO 1.
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.14.01.01 LIMPIEZA Y DESBROSE MANUAL m2 3,273.00 0.91 2,978.43 2595 2,361.45 79.29% 0.00 0.00% 2595 2,361.45 79.29% 678.00 616.98 20.71%
03.14.01.02 DEMOLICION MANUAL DE CONCRETO m3 50.05 60.65 3,035.53 53.43 3,240.53 106.75% 0.00 0.00% 53.43 3,240.53 106.75% -3.38 -205.00 -6.75%
03.14.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 1.00 9,074.25 9,074.25 0.15 1,361.14 15.00% 0.00 0.00% 0.15 1,361.14 15.00% 0.85 7,713.11 85.00%
03.14.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 76.57 20.22 1,548.25 77 1,556.94 100.56% 0.00 0.00% 77 1,556.94 100.56% -0.43 -8.69 -0.56%
03.14.01.05 REFINE, COMPACTACION Y NIVELACION m2 1,540.80 2.34 3,605.47 700.08 1,638.19 45.44% 0.00 0.00% 700.08 1,638.19 45.44% 840.72 1,967.28 54.56%
03.14.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 1,095.30 40.58 44,447.27 90.9 3,688.72 8.30% 0.00 0.00% 90.9 3,688.72 8.30% 1,004.40 40,758.55 91.70%
03.14.01.07 CONCRETO f´c=175Kg/cm2 m3 158.20 557.52 88,199.66 49.68 27,697.59 31.40% 0.00 0.00% 49.68 27,697.59 31.40% 108.52 60,502.07 68.60%
03.14.01.08 JUNTAS ASFALTICAS m 860.70 6.54 5,628.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 860.70 5,628.98 100.00%
03.14.01.09 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 110.70 25.96 2,873.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 110.70 2,873.77 100.00%
03.14.01.10 CURADO DE CONCRETO m2 861.00 0.49 421.89 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 861.00 421.89 100.00%
03.14.02 TOMA LATERAL TIPO I EN CL 14 (SUBLATERAL 01 - 14, 02-01-14, 02-14 Y 01-01 -14) - 14 und
03.14.02.01 LIMPIEZA Y DESBROSE MANUAL m2 42.00 0.91 38.22 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 42.00 38.22 100.00%
03.14.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 26.60 4.54 120.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 26.60 120.76 100.00%
03.14.02.03 DEMOLICION MANUAL DE CONCRETO m3 1.31 60.65 79.45 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.31 79.45 100.00%
03.14.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 3.58 30.32 108.55 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.58 108.55 100.00%
03.14.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 4.63 20.22 93.62 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.63 93.62 100.00%
03.14.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 46.26 56.94 2,634.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 46.26 2,634.04 100.00%
03.14.02.07 CONCRETO f´c=175Kg/cm2 m3 4.07 557.52 2,269.11 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.07 2,269.11 100.00%
03.14.02.08 JUNTAS ASFALTICAS m 35.84 6.54 234.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 35.84 234.39 100.00%
03.14.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 14.00 284.30 3,980.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.00 3,980.20 100.00%
03.14.03 AFORADOR PARSHALL - AZANGARO (01 UND)
03.14.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.14.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.14.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.14.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.14.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.14.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.14.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.14.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.14.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.14.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.14.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.14.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.14.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.14.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.14.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.14.04 REHABILITACION DE POZA DISIPADORA DE ENERGIA CL 14 - AZANGARO 1 (07 UND)
03.14.04.01 LIMPIEZA Y DESBROSE MANUAL m2 40.43 0.91 36.79 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 40.43 36.79 100.00%
03.14.04.02 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 2.28 15.16 34.56 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.28 34.56 100.01%
03.14.04.03 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 1.75 100.78 176.37 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.75 176.37 100.00%
03.14.04.04 SELLADO DE GRIETAS Y FISURAS ep=2cm m 7.00 50.51 353.57 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.00 353.57 100.00%
03.14.05 PARTIDOR DE CAUDAL TIPO I - AZANGARO 1 (03 UND)
03.14.05.01 LIMPIEZA Y DESBROSE MANUAL m2 6.75 0.91 6.14 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.75 6.14 100.04%
03.14.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 4.28 4.54 19.43 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.28 19.43 100.01%
03.14.05.03 DEMOLICION MANUAL DE CONCRETO m3 0.28 60.65 16.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.28 16.98 100.01%
03.14.05.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.77 30.32 23.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.77 23.35 99.98%
03.14.05.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.96 20.22 19.41 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.96 19.41 100.01%
03.14.05.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 9.91 56.94 564.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.91 564.28 100.00%
03.14.05.07 CONCRETO f´c=175Kg/cm2 m3 0.87 557.52 485.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.87 485.04 100.00%
03.14.05.08 JUNTAS ASFALTICAS m 12.00 6.54 78.48 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.00 78.48 100.00%
03.14.05.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.65m. und 6.00 316.20 1,897.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 1,897.20 100.00%
03.15 CANAL LATERAL 15 - AZANGARO
03.15.01 MEJORAMIENTO DEL CANAL LATERAL 15 DE AZANGARO.
03.15.01.01 LIMPIEZA Y DESBROSE MANUAL m2 842.00 0.91 766.22 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 842.00 766.22 100.00%
03.15.01.02 DEMOLICION MANUAL DE CONCRETO m3 27.38 60.65 1,660.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.38 1,660.60 100.00%
03.15.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.10 9,074.25 907.43 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.10 907.43 100.00%
03.15.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 41.07 20.22 830.44 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 41.07 830.44 100.00%
03.15.01.05 REFINE, COMPACTACION Y NIVELACION m2 366.96 2.34 858.69 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 366.96 858.69 100.00%
03.15.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 236.30 40.58 9,589.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 236.30 9,589.05 100.00%
03.15.01.07 CONCRETO f´c=175Kg/cm2 m3 35.03 557.52 19,529.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 35.03 19,529.93 100.00%
03.15.01.08 JUNTAS ASFALTICAS m 177.92 6.54 1,163.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 177.92 1,163.60 100.00%
03.15.01.09 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 25.02 25.96 649.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 25.02 649.52 100.00%
03.15.01.10 CURADO DE CONCRETO m2 194.60 0.49 95.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 194.60 95.35 100.00%
03.15.02 TOMA LATERAL TIPO I - AZANGARO (06 UND)
03.15.02.01 LIMPIEZA Y DESBROSE MANUAL m2 18.00 0.91 16.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 18.00 16.38 100.00%
03.15.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 11.40 4.54 51.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.40 51.76 99.99%
03.15.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.56 60.65 33.96 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.56 33.96 100.01%
03.15.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.53 30.32 46.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.53 46.39 100.00%
03.15.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 1.98 20.22 40.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.98 40.04 99.99%
03.15.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 19.83 56.94 1,129.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 19.83 1,129.12 100.00%
03.15.02.07 CONCRETO f´c=175Kg/cm2 m3 1.75 557.52 975.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.75 975.66 100.00%
03.15.02.08 JUNTAS ASFALTICAS m 16.36 6.54 106.99 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 16.36 106.99 100.00%
03.15.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 6.00 284.30 1,705.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 1,705.80 100.00%
03.15.03 AFORADOR PARSHALL - AZANGARO (01 UND)
03.15.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.15.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.15.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.15.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.15.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.15.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.15.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.15.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.15.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.15.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.15.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.15.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.15.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.15.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.15.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.16 CANAL LATERAL 16 - AZANGARO
03.16.01 MEJORAMIENTO DEL CANAL LATERAL 16 - AZANGARO
03.16.01.01 LIMPIEZA Y DESBROSE MANUAL m2 731.00 0.91 665.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 731.00 665.21 100.00%
03.16.01.02 DEMOLICION MANUAL DE CONCRETO m3 39.12 60.65 2,372.63 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 39.12 2,372.63 100.00%
03.16.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.08 9,074.25 725.94 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.08 725.94 100.00%
03.16.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 58.68 20.22 1,186.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 58.68 1,186.51 100.00%
03.16.01.05 REFINE, COMPACTACION Y NIVELACION m2 500.54 2.34 1,171.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 500.54 1,171.26 100.00%
03.16.01.06 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 91.44 35.25 3,223.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 91.44 3,223.26 100.00%
03.16.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 392.70 40.58 15,935.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 392.70 15,935.77 100.00%
03.16.01.08 CONCRETO f´c=175Kg/cm2 m3 53.81 557.52 30,000.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 53.81 30,000.15 100.00%
03.16.01.09 JUNTAS ASFALTICAS m 248.04 6.54 1,622.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 248.04 1,622.18 100.00%
03.16.01.10 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 90.18 25.96 2,341.07 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 90.18 2,341.07 100.00%
03.16.01.11 CURADO DE CONCRETO m2 701.40 0.49 343.69 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 701.40 343.69 100.00%
03.16.02 TOMA LATERAL TIPO I - CANAL LATERAL 16 AZANGARO (08 UND)
03.16.02.01 LIMPIEZA Y DESBROSE MANUAL m2 24.00 0.91 21.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 24.00 21.84 100.00%
03.16.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 15.20 4.54 69.01 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.20 69.01 100.00%
03.16.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.75 60.65 45.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.75 45.49 99.99%
03.16.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.04 30.32 61.85 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.04 61.85 100.00%
03.16.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.64 20.22 53.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.64 53.38 100.00%
03.16.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 26.44 56.94 1,505.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 26.44 1,505.49 100.00%
03.16.02.07 CONCRETO f´c=175Kg/cm2 m3 2.33 557.52 1,299.02 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.33 1,299.02 100.00%
03.16.02.08 JUNTAS ASFALTICAS m 20.48 6.54 133.94 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 20.48 133.94 100.00%
03.16.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 8.00 284.30 2,274.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 2,274.40 100.00%
03.16.03 AFORADOR PARSHALL - AZANGARO (01 UND)
03.16.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.16.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.16.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.16.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.16.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.16.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.16.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.16.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.16.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.16.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.16.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.16.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.16.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.16.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.16.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.17 CANAL LATERAL 17 DE AZANGARO
03.17.01 CONSTRUCCION DEL CANAL LATERAL 17 (SUBLATERALES 03 - 17, 01-17 Y 02-17) (Lt=801m.)
03.17.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,321.65 0.91 1,202.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,321.65 1,202.70 100.00%
03.17.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.40 9,074.25 3,629.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.40 3,629.70 100.00%
03.17.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 406.67 30.32 12,330.23 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 406.67 12,330.23 100.00%
03.17.01.04 REFINE, COMPACTACION Y NIVELACION m2 1,057.32 2.34 2,474.13 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,057.32 2,474.13 100.00%
03.17.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 681.70 40.58 27,663.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 681.70 27,663.39 100.00%
03.17.01.06 CONCRETO f´c=175Kg/cm2 m3 100.93 557.52 56,270.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 100.93 56,270.49 100.00%
03.17.01.07 JUNTAS ASFALTICAS m 513.28 6.54 3,356.85 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 513.28 3,356.85 100.00%
03.17.01.08 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 72.09 25.96 1,871.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 72.09 1,871.46 100.00%
03.17.01.09 CURADO DE CONCRETO m2 560.70 0.49 274.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 560.70 274.74 100.00%
03.17.02 TOMA LATERAL TIPO I - CL 17 (SUBLATERALES 03 - 17, 01-17 Y 02-17) 06 UND
03.17.02.01 LIMPIEZA Y DESBROSE MANUAL m2 18.00 0.91 16.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 18.00 16.38 100.00%
03.17.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 11.40 4.54 51.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.40 51.76 99.99%
03.17.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.53 30.32 46.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.53 46.39 100.00%
03.17.02.04 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 19.83 56.94 1,129.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 19.83 1,129.12 100.00%
03.17.02.05 CONCRETO f´c=175Kg/cm2 m3 1.75 557.52 975.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.75 975.66 100.00%
03.17.02.06 JUNTAS ASFALTICAS m 15.36 6.54 100.45 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.36 100.45 100.00%
03.17.02.07 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 6.00 284.30 1,705.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 1,705.80 100.00%
03.17.03 AFORADOR PARSHALL - AZANGARO (01 UND)
03.17.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.17.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.17.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.17.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.17.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.17.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.17.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.17.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.17.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.17.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.17.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.17.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.17.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.17.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.17.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.17.04 POZA DISIPADORA DE ENERGIA - AZANGARO (05 UND)
03.17.04.01 LIMPIEZA Y DESBROSE MANUAL m2 28.88 0.91 26.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 28.88 26.28 100.00%
03.17.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 12.19 4.54 55.34 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.19 55.34 100.00%
03.17.04.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 13.66 30.32 414.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.66 414.17 100.00%
03.17.04.04 REFINE, COMPACTACION Y NIVELACION m2 52.89 2.34 123.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 52.89 123.76 100.00%
03.17.04.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 17.07 18.19 310.50 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.07 310.50 100.00%
03.17.04.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 12.19 24.01 292.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.19 292.68 100.00%
03.17.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 38.56 40.58 1,564.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 38.56 1,564.76 100.00%
03.17.04.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 216.27 6.55 1,416.57 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 216.27 1,416.57 100.00%
03.17.04.09 CONCRETO f´c=210Kg/cm2 m3 5.38 581.72 3,129.65 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.38 3,129.65 100.00%
03.17.04.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 36.95 29.15 1,077.09 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 36.95 1,077.09 100.00%
03.17.04.11 JUNTAS ASFALTICAS m 13.50 6.54 88.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.50 88.29 100.00%
03.17.05 PARTIDOR DE CAUDAL TIPO II - AZANGARO (01 UND)
03.17.05.01 LIMPIEZA Y DESBROSE MANUAL m2 2.25 0.91 2.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.25 2.05 99.88%
03.17.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 4.54 6.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.50 6.81 100.00%
03.17.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.26 30.32 7.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.26 7.88 100.04%
03.17.05.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 0.32 18.19 5.82 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.32 5.82 100.01%
03.17.05.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 5.54 56.94 315.45 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.54 315.45 100.00%
03.17.05.06 CONCRETO f´c=175Kg/cm2 m3 0.42 557.52 234.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.42 234.16 100.00%
03.17.05.07 JUNTAS ASFALTICAS m 6.00 6.54 39.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 39.24 100.00%
03.17.05.08 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.65m. und 3.00 316.20 948.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 948.60 100.00%
03.18 CANAL LATERAL 18 - IRIBAMBA
03.18.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 18 (SUBLATERALES 01 - 18 Y 02 - 18) - IRIBAMBA
03.18.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,229.05 0.91 1,118.44 1229.05 1,118.44 100.00% 0.00 0.00% 1229.05 1,118.44 100.00% 0.00 0.00 0.00%
03.18.01.02 DEMOLICION MANUAL DE CONCRETO m3 15.37 60.65 932.19 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.37 932.19 100.00%
03.18.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.08 9,074.25 725.94 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.08 725.94 100.00%
03.18.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 64.95 30.32 1,969.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 64.95 1,969.28 100.00%
03.18.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 23.05 20.22 466.07 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.05 466.07 100.00%
03.18.01.06 REFINE, COMPACTACION Y NIVELACION m2 347.70 2.34 813.62 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 347.70 813.62 100.00%
03.18.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 224.40 40.58 9,106.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 224.40 9,106.15 100.00%
03.18.01.08 CONCRETO f´c=175Kg/cm2 m3 28.90 557.52 16,112.33 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 28.90 16,112.33 100.00%
03.18.01.09 JUNTAS ASFALTICAS m 168.96 6.54 1,105.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 168.96 1,105.00 100.00%
03.18.01.10 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 47.41 25.96 1,230.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 47.41 1,230.76 100.00%
03.18.01.11 CURADO DE CONCRETO m2 184.39 0.49 90.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 184.39 90.35 100.00%
03.18.02 TOMA LATERAL TIPO I CL 18 (SUBLATERALES 01 - 18 Y 02-18) IRIBAMBA - 09 UND.
03.18.02.01 LIMPIEZA Y DESBROSE MANUAL m2 27.00 0.91 24.57 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.00 24.57 100.00%
03.18.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 17.10 4.54 77.63 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.10 77.63 100.01%
03.18.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.66 60.65 40.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.66 40.03 100.00%
03.18.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.30 30.32 69.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.30 69.74 99.99%
03.18.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.95 20.22 59.65 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.95 59.65 100.00%
03.18.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 29.74 56.94 1,693.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 29.74 1,693.40 100.00%
03.18.02.07 CONCRETO f´c=175Kg/cm2 m3 2.62 557.52 1,460.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.62 1,460.70 100.00%
03.18.02.08 JUNTAS ASFALTICAS m 23.04 6.54 150.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.04 150.68 100.00%
03.18.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 9.00 284.30 2,558.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 2,558.70 100.00%
03.18.03 TOMA LATERAL TIPO II - CANAL SUBLATERAL 02-18 DE IRIBAMBAI (01 UND)
03.18.03.01 LIMPIEZA Y DESBROSE MANUAL m2 4.00 0.91 3.64 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 3.64 100.00%
03.18.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 4.54 6.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.50 6.81 100.00%
03.18.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 60.65 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.09 5.46 99.97%
03.18.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.51 30.32 15.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.51 15.46 100.02%
03.18.03.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 0.65 18.19 11.82 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.65 11.82 100.03%
03.18.03.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 6.14 56.94 349.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.14 349.61 100.00%
03.18.03.07 CONCRETO f´c=175Kg/cm2 m3 0.58 557.52 323.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.58 323.36 100.00%
03.18.03.08 JUNTAS ASFALTICAS m 2.56 6.54 16.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.56 16.74 100.01%
03.18.03.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 2.00 284.30 568.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 568.60 100.00%
03.18.04 AFORADOR PARSHALL - IRIBAMBA CL-18 (01 UND)
03.18.04.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.18.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.18.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.18.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.18.04.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.18.04.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.18.04.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.18.04.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.18.04.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.18.04.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.18.04.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.18.04.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.18.04.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.18.04.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.18.04.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.18.05 PARTIDOR DE CAUDAL TIPO I - IRIBAMBA (01 UND)
03.18.05.01 LIMPIEZA Y DESBROSE MANUAL m2 2.25 0.91 2.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.25 2.05 99.88%
03.18.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.43 4.54 6.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.43 6.49 100.03%
03.18.05.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 60.65 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.09 5.46 99.97%
03.18.05.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.26 30.32 7.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.26 7.88 100.04%
03.18.05.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.32 20.22 6.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.32 6.47 100.01%
03.18.05.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 3.30 56.94 187.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.30 187.90 100.00%
03.18.05.07 CONCRETO f´c=175Kg/cm2 m3 0.29 557.52 161.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.29 161.68 100.00%
03.18.05.08 JUNTAS ASFALTICAS m 4.00 6.54 26.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 26.16 100.00%
03.18.05.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.65m. und 2.00 316.20 632.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 632.40 100.00%
03.18.06 PASE VEHICULAR - IRIBAMBA (01 UND)
03.18.06.01 LIMPIEZA Y DESBROSE MANUAL m2 8.00 0.91 7.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 7.28 100.00%
03.18.06.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 8.00 4.54 36.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 36.32 100.00%
03.18.06.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 5.46 30.32 165.55 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.46 165.55 100.00%
03.18.06.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 3.15 21.92 69.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.15 69.05 100.00%
03.18.06.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 2.89 18.19 52.57 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.89 52.57 100.00%
03.18.06.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 3.96 331.36 1,312.19 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.96 1,312.19 100.00%
03.18.06.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 11.60 40.58 470.73 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.60 470.73 100.00%
03.18.06.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 162.51 6.55 1,064.44 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 162.51 1,064.44 100.00%
03.18.06.09 CONCRETO f´c=210Kg/cm2 m3 1.88 581.72 1,093.63 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.88 1,093.63 100.00%
03.18.06.10 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 4.40 18.64 82.02 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.40 82.02 100.00%
03.18.06.11 PINTURA LATEX 02 MANOS EN MUROS EXTERIORES m2 4.40 7.97 35.07 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.40 35.07 99.99%
03.19 CANAL LATERAL 19 - IRIBAMBA
03.19.01 MEJORAMIENTO DEL CANAL LATERAL 19 (SUBLATERALES 02 - 19, 01 - 19, 01-01 - 19 y 02-01 - 19) - IRIBAMBA
03.19.01.01 LIMPIEZA Y DESBROSE MANUAL m2 3,966.00 0.91 3,609.06 3686 3,354.26 92.94% 0.00 0.00% 3686 3,354.26 92.94% 280.00 254.80 7.06%
03.19.01.02 DEMOLICION MANUAL DE CONCRETO m3 73.48 60.65 4,456.56 107.48 6,518.66 146.27% 0.00 0.00% 107.48 6,518.66 146.27% -34.00 -2,062.10 -46.27%
03.19.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 1.00 9,074.25 9,074.25 0.1 907.43 10.00% 0.00 0.00% 0.1 907.43 10.00% 0.90 8,166.83 90.00%
03.19.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 110.22 20.22 2,228.65 161.22 3,259.87 146.27% 0.00 0.00% 161.22 3,259.87 146.27% -51.00 -1,031.22 -46.27%
03.19.01.05 REFINE, COMPACTACION Y NIVELACION m2 1,693.84 2.34 3,963.59 1439.15 3,367.61 84.96% 0.00 0.00% 1439.15 3,367.61 84.96% 254.69 595.97 15.04%
03.19.01.06 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 117.83 35.25 4,153.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 117.83 4,153.51 100.00%
03.19.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 1,034.04 40.58 41,961.34 53.75 2,181.18 5.20% 0.00 0.00% 53.75 2,181.18 5.20% 980.29 39,780.17 94.80%
03.19.01.08 CONCRETO f´c=175Kg/cm2 m3 151.71 557.52 84,581.36 107.48 59,922.25 70.85% 0.00 0.00% 107.48 59,922.25 70.85% 44.23 24,659.11 29.15%
03.19.01.09 JUNTAS ASFALTICAS m 846.70 6.54 5,537.42 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 846.70 5,537.42 100.00%
03.19.01.10 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 201.42 25.96 5,228.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 201.42 5,228.86 100.00%
03.19.01.11 CURADO DE CONCRETO m2 783.30 0.49 383.82 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 783.30 383.82 100.00%
03.19.02 TOMA LATERAL TIPO I - IRIBAMBA (43 UND) - CL 19 Y SUS SUBLATERALES
03.19.02.01 LIMPIEZA Y DESBROSE MANUAL m2 129.00 0.91 117.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 129.00 117.39 100.00%
03.19.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 81.70 4.54 370.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 81.70 370.92 100.00%
03.19.02.03 DEMOLICION MANUAL DE CONCRETO m3 4.02 60.65 243.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.02 243.81 100.00%
03.19.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 10.98 30.32 332.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.98 332.91 100.00%
03.19.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 14.21 20.22 287.33 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.21 287.33 100.00%
03.19.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 142.09 56.94 8,090.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 142.09 8,090.60 100.00%
03.19.02.07 CONCRETO f´c=175Kg/cm2 m3 12.51 557.52 6,974.58 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.51 6,974.58 100.00%
03.19.02.08 JUNTAS ASFALTICAS m 110.08 6.54 719.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 110.08 719.92 100.00%
03.19.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 43.00 284.30 12,224.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 43.00 12,224.90 100.00%
03.19.03 AFORADOR PARSHALL - IRIBAMBA CL-19 (01 UND)
03.19.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.19.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.19.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.19.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.19.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.19.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.19.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.19.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.19.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.19.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.19.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.19.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.19.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.19.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.19.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.19.04 PARTIDOR DE CAUDAL TIPO I - CL 19 IRIBAMBA (05 UND)
03.19.04.01 LIMPIEZA Y DESBROSE MANUAL m2 11.25 0.91 10.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.25 10.24 99.98%
03.19.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 7.13 4.54 32.37 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.13 32.37 100.00%
03.19.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.47 60.65 28.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.47 28.51 99.98%
03.19.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.28 30.32 38.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.28 38.81 100.00%
03.19.04.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 1.65 20.22 33.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.65 33.36 100.01%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.19.04.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 16.52 56.94 940.65 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 16.52 940.65 100.00%
03.19.04.07 CONCRETO f´c=175Kg/cm2 m3 1.45 557.52 808.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.45 808.40 100.00%
03.19.04.08 JUNTAS ASFALTICAS m 20.00 6.54 130.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 20.00 130.80 100.00%
03.19.04.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.65m. und 10.00 316.20 3,162.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.00 3,162.00 100.00%
03.20 CANAL LATERAL 20 - BADO
03.20.01 MEJORAMIENTO DEL CANAL LATERAL 20 - BADO
03.20.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,740.00 0.91 1,583.40 1740 1,583.40 100.00% 0.00 0.00% 1740 1,583.40 100.00% 0.00 0.00 0.00%
03.20.01.02 DEMOLICION MANUAL DE CONCRETO m3 70.53 60.65 4,277.64 5.37 325.69 7.61% 0.00 0.00% 5.37 325.69 7.61% 65.16 3,951.95 92.39%
03.20.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.50 9,074.25 4,537.13 0.02 181.49 4.00% 0.00 0.00% 0.02 181.49 4.00% 0.48 4,355.64 96.00%
03.20.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 105.80 20.22 2,139.28 8.05 162.77 7.61% 0.00 0.00% 8.05 162.77 7.61% 97.75 1,976.51 92.39%
03.20.01.05 REFINE, COMPACTACION Y NIVELACION m2 1,511.40 2.34 3,536.68 70.1 164.03 4.64% 0.00 0.00% 70.1 164.03 4.64% 1,441.30 3,372.64 95.36%
03.20.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 974.10 40.58 39,528.98 5.76 233.74 0.59% 0.00 0.00% 5.76 233.74 0.59% 968.34 39,295.24 99.41%
03.20.01.07 CONCRETO f´c=175Kg/cm2 m3 144.27 557.52 80,433.41 5.37 2,993.88 3.72% 0.00 0.00% 5.37 2,993.88 3.72% 138.90 77,439.53 96.28%
03.20.01.08 JUNTAS ASFALTICAS m 733.44 6.54 4,796.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 733.44 4,796.70 100.00%
03.20.01.09 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 206.10 25.96 5,350.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 206.10 5,350.36 100.00%
03.20.01.10 CURADO DE CONCRETO m2 801.50 0.49 392.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 801.50 392.74 100.00%
03.20.02 TOMA LATERAL TIPO I - CANAL LATERAL 20 DE BADO (09 UND)
03.20.02.01 LIMPIEZA Y DESBROSE MANUAL m2 27.00 0.91 24.57 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.00 24.57 100.00%
03.20.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 17.10 4.54 77.63 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.10 77.63 100.01%
03.20.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.84 60.65 50.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.84 50.95 99.99%
03.20.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.30 30.32 69.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.30 69.74 99.99%
03.20.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.97 20.22 60.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.97 60.05 100.01%
03.20.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 29.74 56.94 1,693.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 29.74 1,693.40 100.00%
03.20.02.07 CONCRETO f´c=175Kg/cm2 m3 2.62 557.52 1,460.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.62 1,460.70 100.00%
03.20.02.08 JUNTAS ASFALTICAS m 23.04 6.54 150.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.04 150.68 100.00%
03.20.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 9.00 284.30 2,558.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 2,558.70 100.00%
03.20.03 AFORADOR PARSHALL - BADO CL-20 (01 UND)
03.20.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.20.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.20.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.20.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.20.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.20.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.20.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.20.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.20.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.20.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.20.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.20.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.20.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.20.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.20.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.20.04 REHABILITACION DE POZA DISIPADORA DE ENERGIA - BADO (02 UND)
03.20.04.01 LIMPIEZA Y DESBROSE MANUAL m2 11.55 0.91 10.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.55 10.51 100.00%
03.20.04.02 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 0.71 15.16 10.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.71 10.76 100.03%
03.20.04.03 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 2.50 100.78 251.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.50 251.95 100.00%
03.20.04.04 SELLADO DE GRIETAS Y FISURAS ep=2cm m 4.00 50.51 202.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 202.04 100.00%
03.21 CANAL LATERAL 21 - BADO
03.21.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 21 (SUBLATERALES 01 - 21 y 02 - 21) - BADO
03.21.01.01 LIMPIEZA Y DESBROSE MANUAL m2 928.05 0.91 844.53 928.05 844.53 100.00% 0.00 0.00% 928.05 844.53 100.00% 0.00 0.00 0.00%
03.21.01.02 DEMOLICION MANUAL DE CONCRETO m3 7.20 60.65 436.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.20 436.68 100.00%
03.21.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.25 9,074.25 2,268.56 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.25 2,268.56 100.00%
03.21.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 71.58 30.32 2,170.31 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 71.58 2,170.31 100.00%
03.21.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 10.80 20.22 218.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.80 218.38 100.00%
03.21.01.06 REFINE, COMPACTACION Y NIVELACION m2 401.89 2.34 940.42 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 401.89 940.42 100.00%
03.21.01.07 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 31.45 35.25 1,108.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 31.45 1,108.61 100.00%
03.21.01.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 219.44 40.58 8,904.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 219.44 8,904.88 100.00%
03.21.01.09 CONCRETO f´c=175Kg/cm2 m3 63.96 557.52 35,658.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 63.96 35,658.98 100.00%
03.21.01.10 JUNTAS ASFALTICAS m 198.02 6.54 1,295.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 198.02 1,295.05 100.00%
03.21.01.11 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 101.70 25.96 2,640.13 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 101.70 2,640.13 100.00%
03.21.01.12 CURADO DE CONCRETO m2 395.50 0.49 193.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 395.50 193.80 100.00%
03.21.02 TOMA LATERAL TIPO I DEL CL 21 (SUBLATERALES 01 - 21 Y 02-21) - BADO 06 UND.
03.21.02.01 LIMPIEZA Y DESBROSE MANUAL m2 18.00 0.91 16.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 18.00 16.38 100.00%
03.21.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 11.40 4.54 51.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.40 51.76 99.99%
03.21.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.56 60.65 33.96 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.56 33.96 100.01%
03.21.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.53 30.32 46.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.53 46.39 100.00%
03.21.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 1.98 20.22 40.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.98 40.04 99.99%
03.21.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 19.83 56.94 1,129.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 19.83 1,129.12 100.00%
03.21.02.07 CONCRETO f´c=175Kg/cm2 m3 1.75 557.52 975.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.75 975.66 100.00%
03.21.02.08 JUNTAS ASFALTICAS m 15.36 6.54 100.45 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.36 100.45 100.00%
03.21.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 6.00 284.30 1,705.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 1,705.80 100.00%
03.21.03 AFORADOR PARSHALL - BADO CL-21 (01 UND)
03.21.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.21.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.21.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.21.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.21.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.21.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.21.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.21.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.21.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.21.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.21.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.21.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.21.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.21.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.21.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.21.04 PARTIDOR DE CAUDAL TIPO I - CL 21 BADO (01 UND)
03.21.04.01 LIMPIEZA Y DESBROSE MANUAL m2 2.25 0.91 2.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.25 2.05 99.88%
03.21.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.43 4.54 6.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.43 6.49 100.03%
03.21.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 60.65 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.09 5.46 99.97%
03.21.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.26 30.32 7.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.26 7.88 100.04%
03.21.04.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.32 20.22 6.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.32 6.47 100.01%
03.21.04.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 3.30 56.94 187.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.30 187.90 100.00%
03.21.04.07 CONCRETO f´c=175Kg/cm2 m3 0.29 557.52 161.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.29 161.68 100.00%
03.21.04.08 JUNTAS ASFALTICAS m 4.00 6.54 26.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 26.16 100.00%
03.21.04.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.65m. und 2.00 316.20 632.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 632.40 100.00%
03.21.05 REHABILITACION DE POZA DISIPADORA DE ENERGIA - BADO (03 UND) CL-21
03.21.05.01 LIMPIEZA Y DESBROSE MANUAL m2 17.33 0.91 15.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.33 15.77 100.00%
03.21.05.02 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 1.07 15.16 16.22 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.07 16.22 100.01%
03.21.05.03 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 1.08 100.78 108.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.08 108.84 100.00%
03.21.05.04 SELLADO DE GRIETAS Y FISURAS ep=2cm m 2.40 50.51 121.22 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.40 121.22 100.00%
03.22 CANAL LATERAL 22 - BADO
03.22.01 CONSTRUCCION DEL CANAL LATERAL 22 - BADO)
03.22.01.01 LIMPIEZA Y DESBROSE MANUAL m2 237.60 0.91 216.22 237.6 216.22 100.00% 0.00 0.00% 237.6 216.22 100.00% 0.00 0.00 0.00%
03.22.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.05 9,074.25 453.71 0.05 453.71 100.00% 0.00 0.00% 0.05 453.71 100.00% 0.00 0.00 0.00%
03.22.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 109.57 30.32 3,322.16 109.57 3,322.16 100.00% 0.00 0.00% 109.57 3,322.16 100.00% 0.00 0.00 0.00%
03.22.01.04 REFINE, COMPACTACION Y NIVELACION m2 190.08 2.34 444.79 190.08 444.79 100.00% 0.00 0.00% 190.08 444.79 100.00% 0.00 0.00 0.00%
03.22.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 122.40 40.58 4,966.99 2.3 93.33 1.88% 0.00 0.00% 2.3 93.33 1.88% 120.10 4,873.66 98.12%
03.22.01.06 CONCRETO f´c=175Kg/cm2 m3 18.14 557.52 10,113.41 14.18 7,905.63 78.17% 0.00 0.00% 14.18 7,905.63 78.17% 3.96 2,207.78 21.83%
03.22.01.07 JUNTAS ASFALTICAS m 92.16 6.54 602.73 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 92.16 602.73 100.00%
03.22.01.08 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 25.92 25.96 672.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 25.92 672.88 100.00%
03.22.01.09 CURADO DE CONCRETO m2 100.80 0.49 49.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 100.80 49.39 100.00%
03.22.02 AFORADOR PARSHALL - CL 22 BADO (01 UND)
03.22.02.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.22.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.22.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.22.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.22.02.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.22.02.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.22.02.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.22.02.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.22.02.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.22.02.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.22.02.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.22.02.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.22.02.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.22.02.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.22.02.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.22.03 POZA DISIPADORA DE ENERGIA - BADO (01 UND)
03.22.03.01 LIMPIEZA Y DESBROSE MANUAL m2 5.78 0.91 5.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.78 5.26 100.00%
03.22.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 2.44 4.54 11.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 11.08 99.98%
03.22.03.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.73 30.32 82.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.73 82.77 100.00%
03.22.03.04 REFINE, COMPACTACION Y NIVELACION m2 10.58 2.34 24.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.58 24.76 99.99%
03.22.03.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 3.41 18.19 62.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.41 62.03 100.00%
03.22.03.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 2.44 24.01 58.58 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 58.58 100.01%
03.22.03.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 7.71 40.58 312.87 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.71 312.87 100.00%
03.22.03.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 43.25 6.55 283.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 43.25 283.29 100.00%
03.22.03.09 CONCRETO f´c=210Kg/cm2 m3 1.08 581.72 628.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.08 628.26 100.00%
03.22.03.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 7.39 29.15 215.42 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.39 215.42 100.00%
03.22.03.11 JUNTAS ASFALTICAS m 2.70 6.54 17.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.70 17.66 99.99%
03.23 PRUEBAS DE LABORATORIO Y DISEÑO DE MEZCLA
03.23.01 ENSAYO DE MECANICA DE SUELOS und 13.00 380.00 4,940.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.00 4,940.00 100.00%
03.23.02 PRUEBA DE CALIDAD DEL CONCRETO und 200.00 30.00 6,000.00 50 1,500.00 25.00% 0.00 0.00% 50 1,500.00 25.00% 150.00 4,500.00 75.00%
03.23.03 DISEÑO DE MEZCLAS und 10.00 250.00 2,500.00 3 750.00 30.00% 0.00 0.00% 3 750.00 30.00% 7.00 1,750.00 70.00%
04 FLETE TERRESTRE
04.01 FLETE TERRESTRE
04.01.01 FLETE TERRESTRE POR PESO EN CAMION DE CARGA 10TON AYACUCHO - kg 296,330.89 0.07 20,743.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 296,330.89 20,743.16 100.00%
04.01.02 FLETE TERRESTRE DE CEMENTO EN CAMION VOLQUETE DE 15M3 HUANTA kg 1,511,045.00 0.04 60,441.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,511,045.00 60,441.80 100.00%
04.01.03 FLETE TERRESTRE POR VOLUMEN AYACUCHO - OBRA VJE 1.00 1,500.00 1,500.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 1,500.00 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
04.02 FLETE RURAL
04.02.01 ACARREO DE MATERIALES POR PESO A PIE DE OBRA CON CARRETILLA B kg 35,784.64 0.03 1,073.54 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 35,784.64 1,073.54 100.00%
04.02.02 ACARREO DE AGREGADOS A PIE DE OBRA CON CARRETILLA BUGUI - C m3 735.75 30.60 22,513.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 735.75 22,513.95 100.00%
04.02.03 ACARREO DE CEMENTO A PIE DE OBRA CON CARRETILLA BUGUI - CANA BOL 4,489.00 1.12 5,027.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4,489.00 5,027.68 100.00%
04.02.04 ACARREO DE MATERIALES POR PESO A PIE DE OBRA CON CARRETILLA kg 93,926.14 0.05 4,696.31 2000 100.00 2.13% 0.00 0.00% 2000 100.00 2.13% 91,926.14 4,596.31 97.87%
04.02.05 ACARREO DE AGREGADOS A PIE DE OBRA CON CARRETILLA BUGUI - m3 1,669.81 50.68 84,625.97 500 25,340.00 29.94% 0.00 0.00% 500 25,340.00 29.94% 1,169.81 59,285.97 70.06%
04.02.06 ACARREO DE CEMENTO A PIE DE OBRA CON CARRETILLA BUGUI - CAN BOL 10,487.20 1.86 19,506.19 2000 3,720.00 19.07% 0.00 0.00% 2000 3,720.00 19.07% 8,487.20 15,786.19 80.93%
05 PLAN DE MANEJO AMBIEMTAL
05.01 MEDIDAS DE MITIGACION Y CONTROL DE LOS IMPACTOS AMBIENTALES
05.01.01 ACONDICIONAMIENTO DE BOTADEROS m3 2,481.17 7.39 18,335.85 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2,481.17 18,335.85 100.00%
05.01.02 CHARLAS EN TEMAS AMBIENTALES AL PERSONAL DE LA OBRA TAL 4.00 1,275.00 5,100.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 5,100.00 100.00%
05.01.03 IMPLEMENTACIÓN Y ACONDICIONAMIENTO DE CONTENEDORES DE RESI und 10.00 632.30 6,323.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.00 6,323.00 100.00%
05.01.04 INSTALACION DE LETRINAS SANITARIA und 9.00 670.48 6,034.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 6,034.32 100.00%
05.01.05 MONITOREO DE CALIDAD DE AGUA und 4.00 700.00 2,800.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 2,800.00 100.00%
05.02 PLAN DE CONTINGENCIAS
05.02.01 CAPACITACION Y CONFORMACION DE BRIGADAS DE EMERGENCIA TAL 8.00 1,225.00 9,800.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 9,800.00 100.00%
05.02.02 RESPUESTA ANTE EMERGENCIAS mes 8.00 360.00 2,880.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 2,880.00 100.00%
05.03 PARTICIPACION CIUDADANA
05.03.01 CHARLA DE EDUCACION AMBIENTAL A LA POBLACION TAL 5.00 1,550.00 7,750.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.00 7,750.00 100.00%
05.03.02 APERTURA E INSTALCION DE BUZON DE SUGERENCIAS und 9.00 132.68 1,194.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 1,194.12 100.00%
05.04 PROGRAMA DE CIERRE Y ABANDONO
05.04.01 RESTAURACION DE AREAS AFECTADAS POR CAMPAMENTO m2 1,000.00 1.96 1,960.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,000.00 1,960.00 100.00%
05.04.02 RESTAURACION DE AREAS AFECTADAS POR PREPARACION DE CONCRET m2 1,500.00 2.94 4,410.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,500.00 4,410.00 100.00%
05.04.03 CIERRE DE CONTENEDORES DE RESIDUOS SOLIDOS Y LETRINAS m2 114.00 11.78 1,342.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 114.00 1,342.92 100.00%
06 CAPACITACIONES Y FORTALECIMIENTO ORGANIZACIONAL
06.01 CAPACITACIONES
06.01.01 CAPACITACION EN OPERACIÓN Y MANTENIMIENTO DE LA INFRAESTRU TAL 5.00 614.74 3,073.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.00 3,073.70 100.00%
06.01.02 ELABORACION DEL PLAN DE DISTRIBUCION DEL AGUA EN EL SISTEMA und 1.00 11,950.00 11,950.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 11,950.00 100.00%
06.01.03 CAPACITACION EN OPERACIÓN DE LAS TOMAS LATERALES, AFORADOR TAL 5.00 614.74 3,073.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.00 3,073.70 100.00%
06.01.04 ASISTENCIA TECNICA Y ENTRENAMIENTO EN EL USO DEL AFORADOR Visita 6.00 501.24 3,007.44 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 3,007.44 100.00%
06.01.05 CAPACITACION EN TECNICAS DE RIEGO TAL 5.00 614.74 3,073.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.00 3,073.70 100.00%
06.02 FORTALECIMIENTO ORGANIZACIONAL DEL COMITÉ Y DE JUNTA DE USUARIOS
06.02.01 CAPACITACION EN MANEJO DE HERRAMIENTAS DE GESTION TAL 2.00 1,160.00 2,320.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 2,320.00 100.00%
06.02.02 CAPACITACION EN LEGISLACION Y NORMATIVIDAD DE AGUA TAL 2.00 1,080.00 2,160.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 2,160.00 100.00%
06.02.03 CAPACITACION EN ORGANIZACIÓN DE REGANTES (DEBERES Y DERECHO TAL 10.00 920.00 9,200.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.00 9,200.00 100.00%
06.02.04 EQUIPAMIENTO DE LA OFICINA CENTRAL DEL COMITÉ DE RIEGO jgo 1.00 12,114.00 12,114.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 12,114.00 100.00%
06.03 PASANTIA NACIONAL
06.03.01 PASANTIA NACIONAL (PROYECTO ESPECIAL CHAVIMOCHIC) VJE 1.00 27,720.00 27,720.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 27,720.00 100.00%
07 IMPLEMENTACION DEL PLAN DE VIGILANCIA, PREVENCION Y CONTROL DE COVID 19
07.01 FASE 1
07.01.01 TRABAJOS PRELIMINARES
07.01.01.01 ELABORACION DEL PLAN DE VIGILANCIA, PREVENCION Y CONTROL DE glb 1.00 1,800.00 1,800.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 1,800.00 100.00%
07.01.01.02 SUMINISTRO E INSTALACION DE LAVAMANOS glb 1.00 1,750.00 1,750.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 1,750.00 100.00%
07.01.01.03 ACONDICIONAMIENTO DE ZONAS DE CONTROL Y DESINFECCION (TOPI glb 1.00 7,170.00 7,170.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 7,170.00 100.00%
07.01.01.04 SERVICIO DE TRASLADO DE PERSONAL STAFF A OBRA glb 0.50 10,000.00 5,000.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 5,000.00 100.00%
07.01.01.05 SUELDOS DE PERSONAL OBRERO EN CUARENTENA mes 0.50 7,065.60 3,532.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 3,532.80 100.00%
07.01.01.06 SEGURIDAD EN HOSPEDAJES DE OBREROS mes 0.50 3,000.00 1,500.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 1,500.00 100.00%
07.01.01.07 ACONDICIONAMIENTO SANITARIO DE ALMACEN glb 1.00 3,000.00 3,000.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 3,000.00 100.00%
07.01.02 EQUIPOS DE BIOSEGURIDAD
07.01.02.01 MASCARILLA DE USO PERSONAL DESCARTABLE mes 0.50 600.00 300.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 300.00 100.00%
07.01.02.02 GUANTES DE LATEX (QUIRURGICOS) mes 0.50 240.00 120.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 120.00 100.00%
07.01.02.03 LENTES DE SEGURIDAD TIPO GOOGLE mes 0.50 960.00 480.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 480.00 100.00%
07.01.03 IMPLEMENTACION DE AREAS DE AISLAMIENTO SOCIAL DE PERSONAL OBRERO
07.01.03.01 ALQUILER DE VIVIENDAS PARA PERSONAL OBRERO mes 0.50 2,400.00 1,200.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 1,200.00 100.00%
07.01.03.02 ACONDICIONAMIENTO SANITARIO DE VIVIENDA glb 1.00 3,000.00 3,000.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 3,000.00 100.00%
07.01.03.03 ALIMENTACION DE PERSONAL OBRERO (DESAYUNO, ALMUERZO Y CEN mes 0.50 1,200.00 600.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 600.00 100.00%
07.02 FASE 2 - ADECUACIONES Y ADAPTACIONES
07.02.01 EQUIPOS DE BIOSEGURIDAD
07.02.01.01 MASCARILLA DE USO PERSONAL DESCARTABLE mes 6.00 600.00 3,600.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 3,600.00 100.00%
07.02.01.02 GUANTES DE LATEX (QUIRURGICOS) mes 6.00 240.00 1,440.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 1,440.00 100.00%
07.02.01.03 LENTES DE SEGURIDAD TIPO GOOGLE mes 6.00 960.00 5,760.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 5,760.00 100.00%
07.02.01.04 TRAJE IMPERMEABLE TIPO TYVET mes 6.00 2,280.00 13,680.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 13,680.00 100.00%
07.02.02 IMPLEMENTACION DE AREAS DE DESINFECCION
07.02.02.01 SUMINISTRO E INSTALACION DE LAVAMANOS mes 3.00 1,650.00 4,950.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 4,950.00 100.00%
07.02.02.02 SUMINISTRO E INSTALACION DE DUCHAS DE DESINFECCION mes 3.00 3,000.00 9,000.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 9,000.00 100.00%
07.02.02.03 CUADRILLA DE DESINFECCION DE AMBIENTES mes 3.00 829.92 2,489.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 2,489.76 100.00%
07.02.02.04 IMPLEMENTOS DE ASEO PERSONAL mes 3.00 660.00 1,980.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 1,980.00 100.00%
07.02.03 IMPLEMENTACION DE AREAS DE AISLAMIENTO SOCIAL DE PERSONAL OBRERO
07.02.03.01 ALQUILER DE VIVIENDAS PARA PERSONAL OBRERO mes 3.00 2,400.00 7,200.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 7,200.00 100.00%
07.02.03.02 ALIMENTACION DE PERSONAL OBRERO (DESAYUNO Y CENA) mes 3.00 800.00 2,400.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 2,400.00 100.00%
07.02.03.03 TRANSPORTE DE PERSONAL OBRERO mes 3.00 3,000.00 9,000.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 9,000.00 100.00%
07.02.03.04 SEGURIDAD EN HOSPEDAJES DE OBREROS mes 3.00 3,000.00 9,000.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 9,000.00 100.00%
07.02.04 PLAN DEL MANEJO DEL COVID
07.02.04.01 CUADRILLA COVID-19 mes 6.00 8,400.00 50,400.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 50,400.00 100.00%
07.02.04.02 PLAN DE MANEJO DE RESIDUOS USADOS PARA PROTECCION DE COVID- mes 6.00 3,050.00 18,300.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 18,300.00 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
COSTO DIRECTO 6,605,375.60 552,841.31 8.37% 0.00 0.00% 552,841.31 8.37% 6,052,533.93 91.63%
GASTOS GENERALES 0.08 520,483.86 43,562.24 0.00 43,562.24 476,921.62
SUPERVISIÓN 0.04 240,570.00 20,134.67 0.00 20,134.67 220,435.33
GESTIÓN DEL PROYECTO 0.04 265,000.00 22,179.35 0.00 22,179.35 242,820.65
LIQUIDACIÓN 31,590.90 31,590.90
EXPEDIENTE TÉCNICO 180,000.00 180,000.00
PRESUPUESTO TOTAL 7,843,020.36 638,717.57 8.14% 0.00 0.00% 638,717.57 8.14% 7,204,302.42 91.86%
Fuente: Equipo Tecnico 2019.
ANEXO B N° 02
VALORIZACION DEL AVANCE FISICO DE OBRA DE ADICIONAL N° 01 1
Del 10 al 20 de Febrero - 2021

PROGRAMA REGIONAL DE IRRIGACIÓ N Y DESARROLLO RURAL INTEGRADO


SUPERVISOR DE OBRA : Ing. Wilfredo Molina Rojas
COMPONENTE :MEJORAMIENTO DEL SERVICIO DE AGUA EN EL SISTEMA DE RIEGO CANAL CACHI-HUANTA, DISTRITO DE HUANTA-HUANTA
AYACUCHO RESIDENTE DE OBRA : Ing. Pablo Vladimir Huamani Huamani
DEPARTAMENTO : AYACUCHO
:MEJORAMIENTO DEL SERVICIO DE AGUA EN EL SISTEMA DE RIEGO CANAL CACHI-HUANTA, DISTRITO DE HUANTA-HUANTA
OBRA/META AYACUCHO PROVINCIA : HUANTA
MONTO VALOR REFERENCIAL S/. 165,722.81 DISTRITO : IGUAIN
FUENTE FINANCIAMIENTO : RECURSOS ORDINARIOS
LUGAR : CCONONCCA-CANGARI
MES/AÑ O : FEBRERO 2021
FECHA DE PRESENTACIÓN : 06 DE MARZO DEL 2021

AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO


PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01 OBRAS PRELIMINARES 900.00
1.02 MOVILIZACIÓN Y DESMOVILIZACIÓN DE MAQUINARIA UND 1.00 900.00 900.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 900.00 100.00%
2 CANAL DE CONDUCCIÓN (TRAPEZOIDAL) 139,158.63
2.01 OBRAS PRELIMINARES 7,795.53
02.01.01 LIMPIEZA DE TERRENO MANUAL M2 290.00 0.91 263.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 290.00 263.90 100.00%
02.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCION EN CANAL MES 0.83 9,074.25 7,531.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.83 7,531.63 100.00%
2.02 MOVIMIENTO DE TIERRAS 48,066.69
02.02.01 CORTE DE TERRENO CON MAQINARIA M3 2,616.92 13.24 34,648.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,616.92 34,648.02 100.00%
02.02.02 REFINE, NIVELACIÓN Y COMPACTACIÓN M2 439.20 2.34 1,027.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 439.20 1,027.73 100.00%
02.02.03 RELLENO CON MATERIAL PROPIO M3 565.28 21.92 12,390.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 565.28 12,390.94 100.00%
2.03 OBRAS DE CONCRETO 82,338.96
02.03.01 ENCOFRADO Y DESENCOFRADO EN OBRAS DE ARTE UND 439.20 40.58 17,822.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 439.20 17,822.74 100.00%
02.03.01 CONCRETO f'c=210 kg/cm2 M3 115.72 557.52 64,516.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 115.72 64,516.21 100.00%
2.04 JUNTAS 957.46
02.04.01 JUNTA DE DILATACIÓN M 146.40 6.54 957.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 146.40 957.46 100.00%
3 MITIGACIÓN AMBIENTAL 2,740.98
3.01 REVEGETACIÓN CON PLANTAS DE LA ZONA 2,740.98
03.01.01 COMPRA DE PLANTONES (nativas de la zona) UND 30.00 2.50 75.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.00 75.00 100.00%
HABILITACIÓN HOYO PARA PLANTACION DE PLANTAS (apertura de hoyos) HOYOS 30.00 10.78 323.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.00 323.40 100.00%
PLANTACION DE PLANTONES UND 30.00 14.33 429.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.00 429.90 100.00%
HABILITACIÓN DE LETRINAS SANITARIAS UND 1.00 1,775.12 1,775.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,775.12 100.00%
03.01.02 CLAUSURA DE LETRINAS SANITARIOS UND 1.00 137.56 137.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 137.56 100.00%
4 FLETE 1,836.40
4.01 FLETE TERRESTRE 1,836.40
04.01.01 FLETE TERRESTRE GLB 1.00 1,836.40 1,836.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,836.40 100.00%
COSTO DIRECTO 144,636.01 0.00 0.00% 0.00 0.00% 0.00 0.00% 144,636.00 100.00%
GASTOS GENERALES 15,571.82 0.00 0.00 0.00 15,571.82
GASTOS DE SUPERVISION Y LIQUIDACION 5,514.98 0.00 0.00 0.00 5,514.98
PRESUPUESTO TOTAL 165,722.81 0.00 0.00% 0.00 0.00% 0.00 0.00% 165,722.80 100.00%
Fuente: Equipo Tecnico 2021.
ANEXO B N° 02
VALORIZACIÓN DEL AVANCE FISICO Nº 01 1
mes de NOVIEMBRE - 2020

PROGRAMA REGIONAL DE IRRIGACIÓ N Y DESARROLLO RURAL INTEGRADO


SUPERVISOR DE OBRA : Ing. Wilfredo Molina Rojas
:MEJORAMIENTO DEL SERVICIO DE AGUA EN EL SISTEMA DE RIEGO CANAL CACHI-HUANTA, DISTRITO DE HUANTA-HUANTA
COMPONENTE AYACUCHO RESIDENTE DE OBRA : Ing. Jean Pierre Ricardo Serpa Santa Cruz
DEPARTAMENTO : AYACUCHO
OBRA/META :MEJORAMIENTO DEL SERVICIO DE AGUA EN EL SISTEMA DE RIEGO CANAL CACHI-HUANTA, DISTRITO DE HUANTA-HUANTA
AYACUCHO PROVINCIA : HUANTA
MONTO VALOR REFERENCIAL S/. 7,843,020.36 DISTRITO : HUANTA
ASIGNACIÓ N PRESUPUESTAL S/. 850,000.00
LUGAR : PACCOSAN, AZANGARO.
EJECUCIÓ N PRESUPUESTAL DIRECTA S/. 850,000.00
FUENTE FINANCIAMIENTO : RECURSOS ORDINARIOS FECHA DE PRESENTACIÓ N : 07 DE DICIEMBRE DEL 2020
MES/AÑ O : NOVIEMBRE 2020

AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO


PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01 TRABAJOS PRELIMINARES Y OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACIÓN DE OBRA DE 3.60 X 4.80 m (Gigantografía) und 2.00 1,129.60 2,259.20 2 2,166.94 95.92% 0.00 0.00% 2 2,259.20 100.00% 0.00 0.00 0.00%
01.02 CAMPAMENTO DE OBRA (6mX4.2m) und 5.00 2,504.13 12,520.65 2.04 5,000.96 39.94% 0.00 0.00% 2.04 5,108.43 40.80% 2.96 7,412.22 59.20%
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS PARA VJE 4.00 700.00 2,800.00 4 2,800.00 100.00% 0.00 0.00% 4 2,800.00 100.00% 0.00 0.00 0.00%
01.04 TALLER DE CAPACITACION EN SEGURIDAD EN OBRA TAL 6.00 388.76 2,332.56 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 2,332.56 100.00%
01.05 CINTA PLASTICA P/SEÑAL DE PELIGRO - LIMITE DE OBRA m 5,000.00 1.25 6,250.00 809 962.71 15.40% 0.00 0.00% 809 1,011.25 16.18% 4,191.00 5,238.75 83.82%
01.06 EQUIPOS DE PROTECICON INDIVIDUAL jgo 1.00 24,520.00 24,520.00 1 24,520.00 100.00% 0.00 0.00% 1 24,520.00 100.00% 0.00 0.00 0.00%
01.07 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA LA OBRA (IDA Y V VJE 2.00 900.00 1,800.00 2 1,800.00 100.00% 0.00 0.00% 2 1,800.00 100.00% 0.00 0.00 0.00%
02 MEJORAMIENTO Y REABILITACION EN EL CANAL MATRIZ O PRINCIPAL - CACHI HUANTA
02.01 OBRAS DE MEJORAMIENTO DE LA BOCATOMA EXISTENTE CACHI HUANTA
02.01.01 MEJORAMIENTO DE LA BOCATOMA EXISTENTE CACHI HUANTA
02.01.01.01 LIMPIEZA Y DESBROSE MANUAL m2 3,000.00 0.91 2,730.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3,000.00 2,730.00 100.00%
02.01.01.02 DESVIO PROVISIONAL DEL RIO - CON MAQUINARIA m3 36.60 22.62 827.89 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 36.60 827.89 100.00%
02.01.01.03 DESCOLMATACION Y ACOMODO DE MATERIAL AGUAS ARRIBA DE LA m3 456.00 22.62 10,314.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 456.00 10,314.72 100.00%
02.01.01.04 DESCOLMATACION Y ACOMODO MANUAL DE MATERIAL EN EL COLCHO m3 127.70 48.51 6,194.73 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 127.70 6,194.73 100.00%
02.01.01.05 DEMOLICION DEL DADO DE CONCRETO (0.25X0.45M.) m3 0.04 60.65 2.43 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.04 2.43 99.84%
02.01.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 0.63 40.58 25.57 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.63 25.57 99.98%
02.01.01.07 ACERO FY=4200 KG/CM2, GRADO 60 kg 5.99 6.55 39.23 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.99 39.23 100.01%
02.01.01.08 CONCRETO f´c=210Kg/cm2 m3 0.04 581.72 23.27 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.04 23.27 99.99%
02.01.01.09 DESMONTAJE DE COMPUERTA METALICA (6.30X1.80m.), e=3/8" und 2.00 1,707.58 3,415.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 3,415.16 100.00%
02.01.01.10 DESMONTAJE DE COMPUERTA METALICA (1.50x1.05m.), e=3/8" und 1.00 571.36 571.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 571.36 100.00%
02.01.01.11 DESMONTAJE DE COMPUERTA METALICA (2.0x1.00m.), e=3/8" und 2.00 895.32 1,790.64 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 1,790.64 100.00%
02.01.01.12 SUMINISTRO E INSTALACION DE COMPUERTA METALICA (6.30X1.80m.), Hvas und 2.00 32,237.23 64,474.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 64,474.46 100.00%
02.01.01.13 SUMINISTRO E INSTALACION DE COMPUERTA METALICA (1.50x1.05m.), Hvas und 1.00 6,218.86 6,218.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 6,218.86 100.00%
02.01.01.14 SUMINISTRO E INSTALACION DE COMPUERTA METALICA (2.0x1.00m.), Hvast und 2.00 6,124.33 12,248.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 12,248.66 100.00%
02.01.01.15 DESMONTAJE DE REJILLA METALICA 2.00X0.96m., e=3/8" - espaciado 0.1m. und 4.00 223.63 894.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 894.52 100.00%
02.01.01.16 SUMINISTRO E INSTALACION DE REJILLA METALICA 2.00X0.96, e=3/8" - Es und 4.00 789.84 3,159.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 3,159.36 100.00%
02.01.01.17 PINTURA EPOXICA EN BARANDAS m 52.00 13.77 716.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 52.00 716.04 100.00%
02.01.02 MEJORAMIENTO Y EQUIPAMIENTO DE LA CASETA DE VIGILANCIA EXISTENTE
02.01.02.01 TARRAJEO EN EXTERIORES E INTERIORES - CASETA DE CONTROL m2 96.72 19.19 1,856.06 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 96.72 1,856.06 100.00%
02.01.02.02 TARRAJEO CIELORASO - CASETA DE CONTROL m2 26.67 32.20 858.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 26.67 858.77 100.00%
02.01.02.03 PISO DE CEMENTO PULIDO Y BRUÑADO, S/COLOREAR e=2" m2 26.67 31.26 833.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 26.67 833.70 100.00%
02.01.02.04 PINTURA LATEX 02 MANOS EN MUROS Y CIELORASO m2 123.39 8.87 1,094.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 123.39 1,094.47 100.00%
02.01.02.05 SUMINISTRO E INST. DE VENTANAS 1.25x1.25 (Incluye vidrio) und 2.00 269.47 538.94 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 538.94 100.00%
02.01.02.06 SUMINISTRO E INST. DE VENTANAS 2.45x1.25 (Incluye vidrio) und 1.00 459.47 459.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 459.47 100.00%
02.01.02.07 SUMINISTRO E INST. DE VENTANAS 1.50x1.25 (Incluye vidrio) und 1.00 311.47 311.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 311.47 100.00%
02.01.02.08 MANTENIMIENTO DE LA PUERTA METALICA EXISTENTE (1.20X2.20m.) und 1.00 231.35 231.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 231.35 100.00%
02.01.02.09 KIT DE HERRAMIENTAS Y MATERIALES PARA LA OPERACION DE LA jgo 1.00 5,544.00 5,544.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 5,544.00 100.00%
02.01.02.10 INSTALACION DE BAÑO DE HOYO SECO und 1.00 1,349.86 1,349.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 1,349.86 100.00%
02.01.03 ELECTRIFICACION EN LA BOCATOMA Y CASETA DE VIGILANCIA EXISTENTE
02.01.03.01 INSTALACION DE RED SECUNDARIO DE 10KVA
02.01.03.01.01 LIMPIEZA DE LINEA m 819.11 0.91 745.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 819.11 745.39 100.00%
02.01.03.01.02 TRAZO Y REPLANTEO DE POSTES und 9.00 118.93 1,070.37 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 1,070.37 100.00%
02.01.03.01.03 TRASLADO DE POSTES und 9.00 364.26 3,278.34 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 3,278.34 100.00%
02.01.03.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 5.73 30.32 173.73 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.73 173.73 100.00%
02.01.03.01.05 POSTES DE C.A.C. 12/300/165/345 und 7.00 973.76 6,816.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.00 6,816.32 100.00%
02.01.03.01.06 POSTES DE C.A.C. 13/500/210/405 und 2.00 1,023.76 2,047.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 2,047.52 100.00%
02.01.03.01.07 RETENIDA INCLINADA SIMPLE AISLADA R1 und 6.00 1,080.19 6,481.14 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 6,481.14 100.00%
02.01.03.01.08 PUESTA A TIERRA PAT-SED und 2.00 1,616.99 3,233.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 3,233.98 100.00%
02.01.03.01.09 PUESTA A TIERRA PAT-1 und 3.00 1,134.49 3,403.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 3,403.47 100.00%
02.01.03.01.10 PUESTA A TIERRA PAT-2 und 4.00 955.24 3,820.96 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 3,820.96 100.00%
02.01.03.01.11 ARMADO TIPO SOPORTE EN ALINIAMIENTO 0-5° PS1-0 und 4.00 1,168.52 4,674.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 4,674.08 100.00%
02.01.03.01.12 ARMADO TIPO SOPORTE DE ANGULO 60-90° PA3-0 und 4.00 1,286.39 5,145.56 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 5,145.56 100.00%
02.01.03.01.13 ARMADO TIPO SUBESTACION CON VANO FLOJO SAM und 1.00 14,600.99 14,600.99 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 14,600.99 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
02.01.03.01.14 CABLE AAAC 1 X 35 mm2 m 819.11 8.21 6,724.89 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 819.11 6,724.89 100.00%
02.01.03.01.15 PRUEBA Y PUESTA EN SERVICIO DE LAS LINEAS Y REDES KM 0.82 953.56 781.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.82 781.92 100.00%
02.01.03.01.16 PRUEBA Y PUESTA EN SERVICIO DE LAS SUB ESTACIONES S.E. 1.00 943.02 943.02 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 943.02 100.00%
02.01.03.02 INSTALACIONES ELECTRICAS EN INTERIORES Y EXTERIORES DE BOCATOMA
02.01.03.02.01 SALIDA PARA CENTROS DE LUZ CASETA DE VIGILANCIA pto 4.00 89.46 357.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 357.84 100.00%
02.01.03.02.02 SALIDA PARA LUZ DE ALUMBRADO BOCATOMA pto 6.00 421.24 2,527.44 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 2,527.44 100.00%
02.01.03.02.03 SALIDA PARA INTERRUPTOR SIMPLE pto 2.00 52.31 104.62 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 104.62 100.00%
02.01.03.02.04 SALIDA PARA INTERRUPTOR DOBLE pto 1.00 62.31 62.31 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 62.31 100.00%
02.01.03.02.05 CABLE ELECTRICO NH-80 2 X 2.5 mm2 m 34.56 4.94 170.73 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 34.56 170.73 100.00%
02.01.03.02.06 CABLE ELECTRICO NH-80 2 X 4 mm2 m 42.04 10.71 450.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 42.04 450.25 100.00%
02.01.03.02.07 CABLE ELECTRICO NH-80 2 X 6 mm2 m 333.12 12.29 4,094.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 333.12 4,094.04 100.00%
02.01.03.02.08 TUBERIA PVC SEL 3/4" PARA TOMACORRIENTE m 17.28 4.88 84.33 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.28 84.33 100.00%
02.01.03.02.09 TUBERIA PVC SAP 3/4" PARA ILUMINACION m 21.02 4.88 102.58 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 21.02 102.58 100.00%
02.01.03.02.10 TUBERIA PVC SAP 3/4" PARA ALUMBRADO EXTERIOR m 51.64 7.61 392.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 51.64 392.98 100.00%
02.01.03.02.11 TUBERIA PVC SAP 3/4" PARA MOTOR ELECTRICO m 48.20 8.41 405.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 48.20 405.36 100.00%
02.01.03.02.12 SALIDA PARA TOMACORRIENTE DOBLE C/LINEA DE TIERRA pto 4.00 61.77 247.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 247.08 100.00%
02.01.03.02.13 TABLERO GENERAL Y INTERRUPTORES und 1.00 968.92 968.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 968.92 100.00%
02.01.03.02.14 TABLERO DESTRIBUCION, INTERRUPTORE Y CONTACTORES und 1.00 1,736.51 1,736.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 1,736.51 100.00%
02.01.03.02.15 POZO DE PUESTA TIERRA und 1.00 1,595.20 1,595.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 1,595.20 100.00%
02.01.03.02.16 POSTE DE TUBO CIRCULAR REDONDO DE 6" X 3.5m und 3.00 583.58 1,750.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 1,750.74 100.00%
02.01.03.02.17 INSTALACION DE MOTOR MONOFASICO DE INVERSION DE GIRO C und 1.00 3,149.98 3,149.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 3,149.98 100.00%
02.02 MEJORAMIENTO DEL DESARENADOR EXISTENTE
02.02.01 DESCOLMATACION Y LIMPIEZA DENTRO DEL DESARENADOR m3 14.08 18.19 256.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.08 256.12 100.00%
02.02.02 DESMONTAJE DE COMPUERTA METALICA TIPO IZAJE (1.85x1.40m.), e=1/4" und 2.00 756.22 1,512.44 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 1,512.44 100.00%
02.02.03 DESMONTAJE DE COMPUERTA METALICA TIPO IZAJE (0.80x0.70m.), e=1/4" und 1.00 447.72 447.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 447.72 100.00%
02.02.04 DESMONTAJE DE COMPUERTA METALICA TIPO IZAJE (0.70x0.75m.), e=1/4" und 2.00 447.72 895.44 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 895.44 100.00%
02.02.05 DESMONTAJE DE REJILLA METALICA - DESARENADOR und 1.00 431.05 431.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 431.05 100.00%
02.02.06 SUMINISTRO E INSTALACION DE COMPUERTA METALICA (1.85x1.40m.), Hvastag und 2.00 8,061.54 16,123.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 16,123.08 100.00%
02.02.07 SUMINISTRO E INSTALACION DE COMPUERTA METALICA (0.80x0.70m.), Hvasta und 1.00 3,224.38 3,224.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 3,224.38 100.00%
02.02.08 SUMINISTRO E INSTALACION DE COMPUERTA METALICA (0.70x0.75m.), Hvastag und 2.00 3,109.38 6,218.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 6,218.76 100.00%
02.02.09 SUMINISTRO E INSTALACION DE REJILLA DE PLATINA 1/4"X1"- Espaciad und 1.00 2,139.84 2,139.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 2,139.84 100.00%
02.03 MEJORAMIENTO DEL CANAL PRINCIPAL CACHI HUANTA (42.645 km)
02.03.01 LIMPIEZA Y DESBROSE MANUAL m2 37,505.25 0.91 34,129.78 3,070.00 1,872.70 5.49% 86.76 78.95 0.23% 3156.76 2,872.65 8.42% 34,348.49 31,257.13 91.58%
02.03.02 DESCOLMATACION Y ACOMODO MANUAL DEL MATERIAL DE LA PLATAFO m3 4,345.29 18.19 79,040.83 97.75 1,183.75 1.50% 241.41 4,391.25 5.56% 339.16 6,169.32 7.81% 4,006.13 72,871.50 92.19%
02.03.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCION mes 4.50 9,074.25 40,834.13 0.00 0.00% 2.3 20,870.78 51.11% 2.3 20,870.78 51.11% 2.20 19,963.35 48.89%
02.03.04 EXCAVACION EN METERIAL SUELTO m3 4,222.57 30.32 128,028.32 0.00 0.00% 241.41 7,319.55 5.72% 241.41 7,319.55 5.72% 3,981.16 120,708.77 94.28%
02.03.05 DEMOLICION DE CANAL DE CONCRETO CON MARTILLO DEMOLEDOR m3 1,240.39 49.65 61,585.36 0.00 0.00% 48.13 2,389.65 3.88% 48.13 2,389.65 3.88% 1,192.26 59,195.71 96.12%
02.03.06 RELLENO, NIVELACION Y COMPACTACION CON MATERIAL CLASIFICAD m3 9,741.33 67.64 658,903.56 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9,741.33 658,903.56 100.00%
02.03.07 RELLENO CON MATERIAL PROPIO m3 114.80 21.92 2,516.42 0.00 0.00% 25.5 558.96 22.21% 25.5 558.96 22.21% 89.30 1,957.46 77.79%
02.03.08 ELIMINACION DE MATERIAL PRODUCTO DE LA DEMOLICION CON EQUIPO Di m3 1,215.58 28.44 34,571.10 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,215.58 34,571.10 100.00%
02.03.09 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Dist m3 520.96 20.22 10,533.81 0.00 0.00% 48.13 973.19 9.24% 48.13 973.19 9.24% 472.83 9,560.62 90.76%
02.03.10 EMPEDRADO DE PISO SOBRE TERRENO COMPACTO TRAMO ALTO PATA DE m3 181.26 136.59 24,758.30 0.00 0.00% 85.07 11,619.71 46.93% 85.07 11,619.71 46.93% 96.19 13,138.59 53.07%
02.03.11 MURO DE PIEDRA CARAVISTA TRAMO ALTO PATA DE 34+960 AL 36+020 m3 365.70 136.59 49,950.96 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 365.70 49,950.96 100.00%
02.03.12 ENCOFRADO Y DESENCOFRADO NORMAL m2 12,186.27 40.58 494,518.84 0.00 0.00% 158.6 6,435.99 1.30% 158.6 6,435.99 1.30% 12,027.67 488,082.85 98.70%
02.03.13 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 254.01 35.25 8,953.85 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 254.01 8,953.85 100.00%
02.03.14 CONCRETO f´c=175Kg/cm2 m3 1,441.13 557.52 803,458.80 0.00 0.00% 9.95 5,547.32 0.69% 9.95 5,547.32 0.69% 1,431.18 797,911.47 99.31%
02.03.15 JUNTAS ASFALTICAS m 5,486.43 6.54 35,881.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5,486.43 35,881.25 100.00%
02.03.16 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 309.32 100.78 31,173.27 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 309.32 31,173.27 100.00%
02.03.17 SELLADO DE GRIETAS Y FISURAS ep=2cm m 546.80 50.51 27,618.87 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 546.80 27,618.87 100.00%
02.03.18 SELLADO DE GRIETAS Y FISURAS A PRESION ep=2cm m 449.49 68.08 30,601.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 449.49 30,601.28 100.00%
02.04 MEJORAMIENTO DEL CANOAS EXISTENTES
02.04.01 LIMPIEZA Y DESBROSE MANUAL m2 1,090.00 0.91 991.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,090.00 991.90 100.00%
02.04.02 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 130.80 15.16 1,982.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 130.80 1,982.93 100.00%
02.04.03 EMBOQUILLADO DE PIEDRA CON CONCRETO FC=140KG/CM2+60%PM, e=20 m2 99.31 54.23 5,385.58 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 99.31 5,385.58 100.00%
02.04.04 PICADO, LIMPIEZA DE MUROS, BASE Y PAÑOS DEL CANAL e=2.5cm m2 6.89 25.89 178.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.89 178.38 100.00%
02.04.05 DEMOLICION MANUAL DE CONCRETO m3 2.13 60.65 129.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.13 129.18 100.00%
02.04.06 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 5.16 35.25 181.89 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.16 181.89 100.00%
02.04.07 COLOCACION DE ACERO FY=4200 KG/CM2, GRADO 60 EN ESTRUCTURAS kg 343.22 8.13 2,790.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 343.22 2,790.38 100.00%
02.04.08 ENCOFRADO Y DESENCOFRA CARAVISTA m2 61.01 54.85 3,346.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 61.01 3,346.40 100.00%
02.04.09 CONCRETO f´c=210Kg/cm2 m3 7.51 581.72 4,368.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.51 4,368.72 100.00%
02.04.10 CONCRETO f´c=175Kg/cm2 m3 5.00 557.52 2,787.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.00 2,787.60 100.00%
02.04.11 JUNTAS ASFALTICAS m 12.90 6.54 84.37 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.90 84.37 100.00%
02.04.12 REPARACION Y RESANE EN CANOAS EXISTENTES e=8cm (C:A 1:4) m2 4.01 80.46 322.64 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.01 322.64 100.00%
02.05 MUROS DE PROTECCION DE LAS CANOAS EXISTENTES (H=5.0m L=5m., H=3.0m L=15m y H=2.5m. L=7.30m.)
02.05.01 LIMPIEZA Y DESBROSE MANUAL m2 51.91 0.91 47.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 51.91 47.24 100.00%
02.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 80.98 4.54 367.65 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 80.98 367.65 100.00%
02.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 256.31 30.32 7,771.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 256.31 7,771.32 100.00%
02.05.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 116.60 21.92 2,555.87 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 116.60 2,555.87 100.00%
02.05.05 EMBOQUILLADO DE PIEDRA CON CONCRETO FC=140KG/CM2+60%PM, e=20 m2 23.40 54.23 1,268.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.40 1,268.98 100.00%
02.05.06 CONCRETO CICLOPEO F'C=140 KG/CM2+70%PG m3 27.90 190.05 5,302.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.90 5,302.40 100.00%
02.05.07 CONCRETO CICLOPEO F'C=140 KG/CM2+50%PG m3 20.44 261.58 5,346.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 20.44 5,346.70 100.00%
02.05.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 191.10 40.58 7,754.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 191.10 7,754.84 100.00%
02.05.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 2,626.09 6.55 17,200.89 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2,626.09 17,200.89 100.00%
02.05.10 CONCRETO f´c=210Kg/cm2 m3 68.30 581.72 39,731.48 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 68.30 39,731.48 100.00%
02.05.11 COLOCACION DE FILTRO DE GRAVA 3/4" a 1 1/2" m3 3.02 58.00 175.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.02 175.16 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
02.05.12 TUBERIA PVC SAP Ø=4", C-5 NTP ISO 399.002 m 27.30 11.37 310.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.30 310.40 100.00%
02.05.13 TUBERIA PVC SAP Ø=21/2", C-5 NTP ISO 399.002 m 3.70 8.43 31.19 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.70 31.19 100.00%
02.05.14 TUBERIA PVC SAP Ø=2", C-5 NTP ISO 399.002 m 8.40 7.38 61.99 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.40 61.99 100.00%
02.06 MEJORAMIENTO DE POZAS DESIPADORAS DE ENERGIA (13 UND)
02.06.01 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 7.80 15.16 118.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.80 118.25 100.00%
02.06.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 8.00 4.54 36.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 36.32 100.00%
02.06.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 6.00 30.32 181.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 181.92 100.00%
02.06.04 REFINE, COMPACTACION Y NIVELACION m2 8.00 2.34 18.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 18.72 100.00%
02.06.05 DEMOLICION MANUAL DE CONCRETO m3 1.20 60.65 72.78 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.20 72.78 100.00%
02.06.06 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 1.11 35.25 39.13 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.11 39.13 99.99%
02.06.07 COLOCACION DE ACERO FY=4200 KG/CM2, GRADO 60 EN ESTRUCTURAS kg 51.09 8.13 415.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 51.09 415.36 100.00%
02.06.08 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 23.27 56.94 1,324.99 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.27 1,324.99 100.00%
02.06.09 CONCRETO f´c=210Kg/cm2 m3 1.10 581.72 639.89 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.10 639.89 100.00%
02.06.10 CONCRETO f´c=175Kg/cm2 m3 2.10 557.52 1,170.79 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.10 1,170.79 100.00%
02.06.11 RESANE EN MUROS, BASE, PAÑOS DE CANAL y OBRAS DE ARTE EXISTENTE m2 6.54 100.78 659.10 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.54 659.10 100.00%
02.06.12 JUNTAS ASFALTICAS m 11.00 6.54 71.94 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.00 71.94 100.00%
02.06.13 SELLADO DE GRIETAS Y FISURAS ep=2cm m 37.90 50.51 1,914.33 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 37.90 1,914.33 100.00%
02.07 MEJORAMIENTO DEL ACUEDUCTO 35+438 (L=8.30m.)
02.07.01 PICADO DE MUROS, BASE Y PAÑOS DEL CANAL e=2.5cm m2 1.29 25.89 33.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.29 33.40 99.99%
02.07.02 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 1.29 35.25 45.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.29 45.47 100.01%
02.07.03 COLOCACION DE ACERO FY=4200 KG/CM2, GRADO 60 EN ESTRUCTURAS kg 15.90 8.13 129.27 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.90 129.27 100.00%
02.07.04 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 8.24 56.94 469.19 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.24 469.19 100.00%
02.07.05 CONCRETO f´c=210Kg/cm2 m3 0.52 581.72 302.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.52 302.49 100.00%
02.08 MEJORAMIENTO DESARENADOR EXISTENTE 34+948 Y CANAL DE LIMPIA
02.08.01 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 7.50 15.16 113.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.50 113.70 100.00%
02.08.02 PICADO DE MUROS, BASES, PAÑOS DEL CANAL Y OBRAS DE ARTE e=2.5cm m2 1.25 25.89 32.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.25 32.36 100.01%
02.08.03 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 1.25 35.25 44.06 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.25 44.06 100.01%
02.08.04 COLOCACION DE ACERO FY=4200 KG/CM2, GRADO 60 EN ESTRUCTURAS kg 16.22 8.13 131.87 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 16.22 131.87 100.00%
02.08.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 8.00 56.94 455.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 455.52 100.00%
02.08.06 CONCRETO f´c=210Kg/cm2 m3 0.50 581.72 290.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 290.86 100.00%
02.08.07 SELLADO DE GRIETAS Y FISURAS ep=2cm m 17.50 50.51 883.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.50 883.93 100.00%
02.08.08 DESMONTAJE DE COMPUERTA METALICA TIPO IZAJE (0.70x0.90m.), Ht=3.00m und 1.00 447.72 447.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 447.72 100.00%
02.08.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA, IZAJE TIPO ARMACOund ( 1.00 3,559.35 3,559.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 3,559.35 100.00%
02.09 MEJORAMIENTO BOCATOMA DE FONDO 37+940
02.09.01 LIMPIEZA Y DESBROSE MANUAL m2 137.25 0.91 124.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 137.25 124.90 100.00%
02.09.02 DESMONTAJE DE COMPUERTA METALICA TIPO IZAJE EN BOCATOMA DE und 2.00 447.72 895.44 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 895.44 100.00%
02.09.03 DESMONTAJE DE REJILLA METALICA 1.40X5.00m., e=1/4" - espaciado 5Cm.. und 1.00 223.63 223.63 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 223.63 100.00%
02.09.04 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO (0.85x0.6und 1.00 1,713.48 1,713.48 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 1,713.48 100.00%
02.09.05 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO (0.60x0.6und 1.00 1,713.48 1,713.48 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 1,713.48 100.00%
02.09.06 SUMINISTRO E INST. DE REJILLA DE PLATINA 1/4"X1"- Espaciado 5Cm. (1.40x und 1.00 989.84 989.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 989.84 100.00%
02.10 MEJORAMIENTO DE TOMAS LATERALES (27 UND)
02.10.01 DESMONTAJE DE COMPUERTA METALICA TIPO IZAJE EN TOMAS LATERA und 27.00 201.13 5,430.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.00 5,430.51 100.00%
02.10.02 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO (Bc=0. und 17.00 1,019.84 17,337.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.00 17,337.28 100.00%
02.10.03 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO (Bc=0. und 3.00 899.84 2,699.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 2,699.52 100.00%
02.10.04 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO (Bc=0. und 3.00 835.11 2,505.33 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 2,505.33 100.00%
02.10.05 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO (Bc=1. und 1.00 1,797.72 1,797.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 1,797.72 100.00%
02.10.06 SUMINISTRO E INST. DE COMPUERTA METALICA, IZAJE TIPO ARMACO (Bc=0. und 3.00 408.41 1,225.23 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 1,225.23 100.00%
02.11 CANOAS L=Variable (18 UND)
02.11.01 LIMPIEZA Y DESBROSE MANUAL m2 335.60 0.91 305.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 335.60 305.40 100.00%
02.11.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 453.35 4.54 2,058.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 453.35 2,058.21 100.00%
02.11.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 225.82 30.32 6,846.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 225.82 6,846.86 100.00%
02.11.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 282.28 18.19 5,134.67 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 282.28 5,134.67 100.00%
02.11.05 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 86.26 331.36 28,583.11 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 86.26 28,583.11 100.00%
02.11.06 ENCOFRADO Y DESENCOFRA CARAVISTA m2 237.49 54.85 13,026.33 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 237.49 13,026.33 100.00%
02.11.07 ACERO FY=4200 KG/CM2, GRADO 60 kg 3,399.84 6.55 22,268.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3,399.84 22,268.95 100.00%
02.11.08 CONCRETO f´c=210Kg/cm2 m3 48.88 581.72 28,434.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 48.88 28,434.47 100.00%
02.11.09 EMBOQUILLADO DE PIEDRA CON CONCRETO FC=140KG/CM2+60%PM, e=20 m2 216.80 54.23 11,757.06 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 216.80 11,757.06 100.00%
02.11.10 CONCRETO CICLOPEO F'C=175 KG/CM2+30%PM m3 54.72 343.68 18,806.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 54.72 18,806.17 100.00%
02.11.11 JUNTAS ASFALTICAS m 109.20 6.54 714.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 109.20 714.17 100.00%
02.12 PASES VEHICULARES (05 UND)
02.12.01 LIMPIEZA Y DESBROSE MANUAL m2 72.00 0.91 65.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 72.00 65.52 100.00%
02.12.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 72.00 4.54 326.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 72.00 326.88 100.00%
02.12.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 126.00 30.32 3,820.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 126.00 3,820.32 100.00%
02.12.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 102.00 21.92 2,235.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 102.00 2,235.84 100.00%
02.12.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 282.28 18.19 5,134.67 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 282.28 5,134.67 100.00%
02.12.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 69.20 331.36 22,930.11 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 69.20 22,930.11 100.00%
02.12.07 ENCOFRADO Y DESENCOFRA CARAVISTA m2 76.00 54.85 4,168.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 76.00 4,168.60 100.00%
02.12.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 2,023.16 6.55 13,251.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2,023.16 13,251.70 100.00%
02.12.09 CONCRETO f´c=210Kg/cm2 m3 19.00 581.72 11,052.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 19.00 11,052.68 100.00%
02.12.10 BARANDA METALICA CON TUBO DE F°GALV. DE 2" m 102.00 57.80 5,895.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 102.00 5,895.60 100.00%
02.12.11 PINTURA EPOXICA ANTICORROSIVA m2 15.50 36.24 561.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.50 561.72 100.00%
02.12.12 JUNTAS DE DILATACION CON TECNOPORT E=1" m 20.00 3.76 75.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 20.00 75.20 100.00%
02.13 PASE PEATONAL (17 UND)
02.13.01 LIMPIEZA Y DESBROSE MANUAL m2 34.00 0.91 30.94 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 34.00 30.94 100.00%
02.13.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 34.00 4.54 154.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 34.00 154.36 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
02.13.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 107.08 30.32 3,246.67 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 107.08 3,246.67 100.00%
02.13.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 8.50 21.92 186.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.50 186.32 100.00%
02.13.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 123.22 18.19 2,241.37 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 123.22 2,241.37 100.00%
02.13.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 71.15 331.36 23,576.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 71.15 23,576.26 100.00%
02.13.07 ENCOFRADO Y DESENCOFRA CARAVISTA m2 129.20 54.85 7,086.62 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 129.20 7,086.62 100.00%
02.13.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 1,635.18 6.55 10,710.43 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,635.18 10,710.43 100.00%
02.13.09 CONCRETO f´c=210Kg/cm2 m3 27.20 581.72 15,822.78 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.20 15,822.78 100.00%
02.13.10 BARANDA METALICA CON TUBO DE F°GALV. DE 2" m 344.08 57.80 19,887.82 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 344.08 19,887.82 100.00%
02.13.11 PINTURA EPOXICA ANTICORROSIVA m2 52.30 36.24 1,895.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 52.30 1,895.35 100.00%
02.14 TAPAS DE CANAL (L=75m. A=3.10m.; L=72m. A=3.30; L=50m. A=1.45m. y L=184m., A=1.30m.)
02.14.01 LIMPIEZA Y DESBROSE MANUAL m2 228.60 0.91 208.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 228.60 208.03 100.00%
02.14.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 228.60 4.54 1,037.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 228.60 1,037.84 100.00%
02.14.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 76.20 30.32 2,310.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 76.20 2,310.38 100.00%
02.14.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 95.25 18.19 1,732.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 95.25 1,732.60 100.00%
02.14.05 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 76.20 331.36 25,249.63 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 76.20 25,249.63 100.00%
02.14.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 593.34 40.58 24,077.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 593.34 24,077.74 100.00%
02.14.07 ACERO FY=4200 KG/CM2, GRADO 60 kg 237.68 6.55 1,556.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 237.68 1,556.80 100.00%
02.14.08 CONCRETO f´c=210Kg/cm2 m3 59.13 581.72 34,397.10 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 59.13 34,397.10 100.00%
02.15 MURO DE CONCRETO CICLOPEO (L=5.00m.)
02.15.01 LIMPIEZA Y DESBROSE MANUAL m2 12.00 0.91 10.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.00 10.92 100.00%
02.15.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 12.00 4.54 54.48 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.00 54.48 100.00%
02.15.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 25.90 30.32 785.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 25.90 785.29 100.00%
02.15.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 14.35 21.92 314.55 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.35 314.55 100.00%
02.15.05 CONCRETO CICLOPEO F'C=140 KG/CM2+50%PG m3 14.00 261.58 3,662.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.00 3,662.12 100.00%
02.15.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 28.00 40.58 1,136.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 28.00 1,136.24 100.00%
02.15.07 COLOCACION DE FILTRO DE GRAVA 3/4" a 1 1/2" m3 0.60 58.00 34.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.60 34.80 100.00%
02.15.08 TUBERIA PVC SAP Ø=4", C-5 NTP ISO 399.002 m 5.00 11.37 56.85 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.00 56.85 100.00%
02.15.09 TUBERIA PVC SAP Ø=2", C-5 NTP ISO 399.002 m 2.40 7.38 17.71 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.40 17.71 100.01%
02.16 MUROS DE CONCRETO ARMADO (H=3.0m L=35m., H=3.5m L=10m, H=4.5m. L=7m., H=5m. L=40m., H=5.5m. L=3m.)
02.16.01 LIMPIEZA Y DESBROSE MANUAL m2 377.30 0.91 343.34 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 377.30 343.34 100.00%
02.16.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 377.30 4.54 1,712.94 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 377.30 1,712.94 100.00%
02.16.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1,321.40 30.32 40,064.85 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,321.40 40,064.85 100.00%
02.16.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 725.90 21.92 15,911.73 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 725.90 15,911.73 100.00%
02.16.05 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 14.55 24.01 349.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.55 349.35 100.00%
02.16.06 CONCRETO CICLOPEO F'C=140 KG/CM2+70%PG m3 139.20 190.05 26,454.96 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 139.20 26,454.96 100.00%
02.16.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 807.13 40.58 32,753.34 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 807.13 32,753.34 100.00%
02.16.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 17,456.62 6.55 114,340.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17,456.62 114,340.86 100.00%
02.16.09 CONCRETO f´c=210Kg/cm2 m3 468.15 581.72 272,332.22 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 468.15 272,332.22 100.00%
02.16.10 COLOCACION DE FILTRO DE GRAVA 3/4" a 1 1/2" m3 10.26 58.00 595.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.26 595.08 100.00%
02.16.11 TUBERIA PVC SAP Ø=4", C-5 NTP ISO 399.002 m 95.00 11.37 1,080.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 95.00 1,080.15 100.00%
02.16.12 TUBERIA PVC SAP Ø=21/2", C-5 NTP ISO 399.002 m 46.50 8.43 392.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 46.50 392.00 100.00%
02.16.13 TUBERIA PVC SAP Ø=2", C-5 NTP ISO 399.002 m 31.50 7.38 232.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 31.50 232.47 100.00%
02.17 TOMAS PREDIALES Bc=0.25XHc1=0.25m. y Hc=Variable (95 UND)
02.17.01 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 52.25 4.54 237.22 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 52.25 237.22 100.00%
02.17.02 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 93.79 30.32 2,843.71 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 93.79 2,843.71 100.00%
02.17.03 DEMOLICION MANUAL DE CONCRETO m3 4.87 60.65 295.37 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.87 295.37 100.00%
02.17.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 41.10 21.92 900.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 41.10 900.91 100.00%
02.17.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 57.38 18.19 1,043.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 57.38 1,043.74 100.00%
02.17.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 181.13 40.58 7,350.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 181.13 7,350.26 100.00%
02.17.07 ACERO FY=4200 KG/CM2, GRADO 60 kg 204.46 6.55 1,339.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 204.46 1,339.21 100.00%
02.17.08 CONCRETO f´c=210Kg/cm2 m3 22.99 581.72 13,373.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 22.99 13,373.74 100.00%
02.17.09 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 112.81 29.15 3,288.41 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 112.81 3,288.41 100.00%
02.17.10 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE ((Bc=0.25xHc1=0. und 32.00 458.41 14,669.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 32.00 14,669.12 100.00%
02.17.11 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE (Bc=0.25xHc1=0.2 und 11.00 438.41 4,822.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.00 4,822.51 100.00%
02.17.12 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE (Bc=0.25xHc1=0.2 und 6.00 438.41 2,630.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 2,630.46 100.00%
02.17.13 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE (Bc=0.25xHc1=0. und 2.00 358.33 716.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 716.66 100.00%
02.17.14 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE (Bc=0.25xHc1=0. und 28.00 358.33 10,033.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 28.00 10,033.24 100.00%
02.17.15 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE (Bc=0.25xHc1=0.2 und 2.00 358.33 716.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 716.66 100.00%
02.17.16 SUMINISTRO E INST. DE COMPUERTA METALICA, TIPO IZAJE (Bc=0.25xHc1=0.2 und 14.00 358.33 5,016.62 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.00 5,016.62 100.00%
02.18 ACUEDUCTO O PUENTE CANAL L=4.00m. (01 UND)
02.18.01 LIMPIEZA Y DESBROSE MANUAL m2 5.10 0.91 4.64 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.10 4.64 100.02%
02.18.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 5.00 4.54 22.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.00 22.70 100.00%
02.18.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.62 30.32 79.44 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.62 79.44 100.00%
02.18.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 1.96 21.92 42.96 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.96 42.96 100.01%
02.18.05 CONCRETO CICLOPEO F'C=140 KG/CM2+50%PG m3 1.42 261.58 371.44 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.42 371.44 100.00%
02.18.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 13.61 40.58 552.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.61 552.29 100.00%
02.18.07 ACERO FY=4200 KG/CM2, GRADO 60 kg 87.90 6.55 575.75 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 87.90 575.75 100.00%
02.18.08 CONCRETO f´c=210Kg/cm2 m3 0.92 581.72 535.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.92 535.18 100.00%
02.18.09 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 4.80 29.15 139.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.80 139.92 100.00%
02.18.10 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 6.84 18.64 127.50 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.84 127.50 100.00%
02.18.11 JUNTAS ASFALTICAS m 1.30 6.54 8.50 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.30 8.50 100.02%
02.18.12 PINTURA LATEX 02 MANOS EN MUROS EXTERIORES m2 6.84 7.97 54.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.84 54.51 100.01%
02.19 ESPIGONES L=Variable - PROTECCION CANAL (04 UND)
02.19.01 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 142.68 4.54 647.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 142.68 647.77 100.00%
02.19.02 EXCAVACION CON MAQUINARIA m3 791.48 21.37 16,913.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 791.48 16,913.93 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
02.19.03 ENRROCADO Y ACOMODADO CON MAQUINARIA Dmedio de 1.00@2.00m. m3 791.48 67.94 53,773.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 791.48 53,773.15 100.00%
02.19.04 CONCRETO CICLOPEO F'C=140 KG/CM2+70%PG - ESPIGON m3 364.94 161.10 58,791.83 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 364.94 58,791.83 100.00%
03 MEJORAMIENTO Y AMPLIACION DE CANALES LATERALES (22 CANALES LATERALES)
03.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 01 - CANGARI
03.01.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL
03.01.01.01 LIMPIEZA Y DESBROSE MANUAL m2 2,436.00 0.91 2,216.76 2436 1,485.96 67.03% 0.00 0.00% 2436 2,216.76 100.00% 0.00 0.00 0.00%
03.01.01.02 DEMOLICION MANUAL DE CONCRETO m3 21.86 60.65 1,325.81 21.49 867.77 65.45% 0.00 0.00% 21.49 1,303.37 98.31% 0.37 22.44 1.69%
03.01.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.30 9,074.25 2,722.28 0.13 1,049.03 38.53% 0.00 0.00% 0.13 1,179.65 43.33% 0.17 1,542.62 56.67%
03.01.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 30.77 30.32 932.95 30.77 621.25 66.59% 0.00 0.00% 30.77 932.95 100.00% 0.00 0.00 0.00%
03.01.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 32.80 20.22 663.22 32.24 433.95 65.43% 0.00 0.00% 32.24 651.89 98.29% 0.56 11.32 1.71%
03.01.01.06 REFINE, COMPACTACION Y NIVELACION m2 346.41 2.34 810.60 345.04 586.57 72.36% 0.00 0.00% 345.04 807.39 99.60% 1.37 3.21 0.40%
03.01.01.07 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 8.00 35.25 282.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 282.00 100.00%
03.01.01.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 267.80 40.58 10,867.32 13.57 461.24 4.24% 0.00 0.00% 13.57 550.67 5.07% 254.23 10,316.65 94.93%
03.01.01.09 CONCRETO f´c=175Kg/cm2 m3 37.24 557.52 20,762.04 26.62 10,533.27 50.73% 0.00 0.00% 26.62 14,841.18 71.48% 10.62 5,920.86 28.52%
03.01.01.10 JUNTAS ASFALTICAS m 161.52 6.54 1,056.34 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 161.52 1,056.34 100.00%
03.01.01.11 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 35.30 25.96 916.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 35.30 916.39 100.00%
03.01.01.12 CURADO DE CONCRETO m2 242.27 0.49 118.71 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 242.27 118.71 100.00%
03.01.02 TOMA LATERAL TIPO I - CANGARI (14 UND)
03.01.02.01 LIMPIEZA Y DESBROSE MANUAL m2 42.00 0.91 38.22 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 42.00 38.22 100.00%
03.01.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 26.60 4.54 120.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 26.60 120.76 100.00%
03.01.02.03 DEMOLICION MANUAL DE CONCRETO m3 1.12 60.65 67.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.12 67.93 100.00%
03.01.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 3.58 30.32 108.55 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.58 108.55 100.00%
03.01.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 4.60 20.22 93.01 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.60 93.01 100.00%
03.01.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 46.26 56.94 2,634.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 46.26 2,634.04 100.00%
03.01.02.07 CONCRETO f´c=175Kg/cm2 m3 3.90 557.52 2,174.33 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.90 2,174.33 100.00%
03.01.02.08 JUNTAS ASFALTICAS m 35.84 6.54 234.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 35.84 234.39 100.00%
03.01.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 14.00 284.30 3,980.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.00 3,980.20 100.00%
03.01.03 TOMA LATERAL TIPO II - CANGARI (01 UND)
03.01.03.01 LIMPIEZA Y DESBROSE MANUAL m2 4.00 0.91 3.64 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 3.64 100.00%
03.01.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 4.54 6.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.50 6.81 100.00%
03.01.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 60.65 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.09 5.46 99.97%
03.01.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.51 30.32 15.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.51 15.46 100.02%
03.01.03.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.65 20.22 13.14 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.65 13.14 100.02%
03.01.03.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 6.14 56.94 349.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.14 349.61 100.00%
03.01.03.07 CONCRETO f´c=175Kg/cm2 m3 0.58 557.52 323.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.58 323.36 100.00%
03.01.03.08 JUNTAS ASFALTICAS m 2.56 6.54 16.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.56 16.74 100.01%
03.01.03.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 2.00 284.30 568.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 568.60 100.00%
03.01.04 MEJORAMIENTO DE TOMAS LATERALES EXISTENTE - CANGARI (03 UND)
03.01.04.01 LIMPIEZA Y DESBROSE MANUAL m2 6.00 0.91 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 5.46 100.00%
03.01.04.02 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 0.05 100.78 5.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.05 5.04 99.98%
03.01.04.03 DESMONTAJE DE COMPUERTA METALICA (0.25X0.65m.), e=3/16" und 3.00 36.20 108.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 108.60 100.00%
03.01.04.04 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 3.00 284.30 852.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 852.90 100.00%
03.01.05 AFORADOR PARSHALL - CANGARI (01 UND)
03.01.05.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.01.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.01.05.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.01.05.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.01.05.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.01.05.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.01.05.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.01.05.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.01.05.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.01.05.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.01.05.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.01.05.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.01.05.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.01.05.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.01.05.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.01.06 PASES PEATONALES - CANGARI (02 UND)
03.01.06.01 LIMPIEZA Y DESBROSE MANUAL m2 11.44 0.91 10.41 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.44 10.41 100.00%
03.01.06.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 8.80 4.54 39.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.80 39.95 100.01%
03.01.06.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.51 30.32 76.10 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.51 76.10 100.00%
03.01.06.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 0.40 21.92 8.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.40 8.77 99.98%
03.01.06.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 2.64 18.19 48.02 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.64 48.02 100.00%
03.01.06.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 1.06 331.36 351.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.06 351.24 100.00%
03.01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.00 40.58 568.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.00 568.12 100.00%
03.01.06.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 62.43 6.55 408.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 62.43 408.92 100.00%
03.01.06.09 CONCRETO f´c=210Kg/cm2 m3 1.52 581.72 884.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.52 884.21 100.00%
03.01.06.10 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 6.00 18.64 111.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 111.84 100.00%
03.01.06.11 PINTURA LATEX 02 MANOS EN MUROS EXTERIORES m2 6.00 7.97 47.82 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 47.82 100.00%
03.02 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 02 - CANGARI
03.02.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL
03.02.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,640.10 0.91 1,492.49 1330.05 811.33 54.36% 0.00 0.00% 1330.05 1,210.35 81.10% 310.05 282.15 18.90%
03.02.01.02 DEMOLICION MANUAL DE CONCRETO m3 6.72 60.65 407.57 22.29 900.07 220.84% 0.00 0.00% 22.29 1,351.89 331.69% -15.57 -944.32 -231.70%
03.02.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.50 9,074.25 4,537.13 0.5 4,034.73 88.93% 0.00 0.00% 0.5 4,537.13 100.00% 0.00 0.00 0.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.02.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 261.96 30.32 7,942.63 615.12 12,419.27 156.36% 0.00 0.00% 615.12 18,650.44 234.81% -353.16 -10,707.81 -134.81%
03.02.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 10.08 20.22 203.82 33.43 449.97 220.77% 0.00 0.00% 33.43 675.95 331.64% -23.35 -472.14 -231.64%
03.02.01.06 REFINE, COMPACTACION Y NIVELACION m2 830.84 2.34 1,944.17 378.32 643.14 33.08% 0.00 0.00% 378.32 885.27 45.53% 452.52 1,058.90 54.47%
03.02.01.07 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 13.00 35.25 458.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.00 458.25 100.00%
03.02.01.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 538.30 40.58 21,844.21 37.23 1,265.45 5.79% 0.00 0.00% 37.23 1,510.79 6.92% 501.07 20,333.42 93.08%
03.02.01.09 CONCRETO f´c=175Kg/cm2 m3 79.90 557.52 44,545.85 47.11 18,640.96 41.85% 0.00 0.00% 47.11 26,264.77 58.96% 32.79 18,281.08 41.04%
03.02.01.10 JUNTAS ASFALTICAS m 476.17 6.54 3,114.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 476.17 3,114.15 100.00%
03.02.01.11 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 76.86 25.96 1,995.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 76.86 1,995.29 100.00%
03.02.01.12 CURADO DE CONCRETO m2 445.90 0.49 218.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 445.90 218.49 100.00%
03.02.02 TOMA LATERAL TIPO I - CANGARI (18 UND)
03.02.02.01 LIMPIEZA Y DESBROSE MANUAL m2 54.00 0.91 49.14 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 54.00 49.14 100.00%
03.02.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 34.20 4.54 155.27 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 34.20 155.27 100.00%
03.02.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.66 60.65 40.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.66 40.03 100.00%
03.02.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 4.60 30.32 139.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.60 139.47 100.00%
03.02.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 5.83 20.22 117.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.83 117.88 100.00%
03.02.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 59.48 56.94 3,386.79 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 59.48 3,386.79 100.00%
03.02.02.07 CONCRETO f´c=175Kg/cm2 m3 4.90 557.52 2,731.85 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.90 2,731.85 100.00%
03.02.02.08 JUNTAS ASFALTICAS m 46.08 6.54 301.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 46.08 301.36 100.00%
03.02.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 18.00 284.30 5,117.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 18.00 5,117.40 100.00%
03.02.03 TOMA LATERAL TIPO II - CANGARI (01 UND)
03.02.03.01 LIMPIEZA Y DESBROSE MANUAL m2 4.00 0.91 3.64 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 3.64 100.00%
03.02.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 4.54 6.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.50 6.81 100.00%
03.02.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 60.65 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.09 5.46 99.97%
03.02.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.51 30.32 15.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.51 15.46 100.02%
03.02.03.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.65 20.22 13.14 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.65 13.14 100.02%
03.02.03.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 6.14 56.94 349.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.14 349.61 100.00%
03.02.03.07 CONCRETO f´c=175Kg/cm2 m3 0.52 557.52 289.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.52 289.91 100.00%
03.02.03.08 JUNTAS ASFALTICAS m 2.56 6.54 16.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.56 16.74 100.01%
03.02.03.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 2.00 284.30 568.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 568.60 100.00%
03.02.04 AFORADOR PARSHALL - CANGARI (01 UND)
03.02.04.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.02.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.02.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.02.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.02.04.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.02.04.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.02.04.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.02.04.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.02.04.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.02.04.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.02.04.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.02.04.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.02.04.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.02.04.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.02.04.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.02.05 PASES PEATONALES - CANGARI (01 UND)
03.02.05.01 LIMPIEZA Y DESBROSE MANUAL m2 5.72 0.91 5.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.72 5.21 99.91%
03.02.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 4.40 4.54 19.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.40 19.98 99.98%
03.02.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.25 30.32 37.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.25 37.90 100.00%
03.02.05.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 0.20 21.92 4.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.20 4.38 100.09%
03.02.05.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 1.32 18.19 24.01 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.32 24.01 100.00%
03.02.05.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 0.53 331.36 175.62 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.53 175.62 100.00%
03.02.05.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 7.00 40.58 284.06 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.00 284.06 100.00%
03.02.05.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 31.21 6.55 204.43 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 31.21 204.43 100.00%
03.02.05.09 CONCRETO f´c=210Kg/cm2 m3 0.76 581.72 442.11 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.76 442.11 100.00%
03.02.05.10 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 3.00 18.64 55.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 55.92 100.00%
03.02.05.11 PINTURA LATEX 02 MANOS EN MUROS EXTERIORES m2 3.00 7.97 23.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 23.91 100.00%
03.02.06 TAPA DE CONCRETO EN CANAL ABIERTO - CANGARI (5 MT)
03.02.06.01 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.10 30.32 3.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.10 3.03 100.07%
03.02.06.02 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 0.10 331.36 33.14 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.10 33.14 99.99%
03.02.06.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 1.28 40.58 51.94 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.28 51.94 100.00%
03.02.06.04 ACERO FY=4200 KG/CM2, GRADO 60 kg 18.31 6.55 119.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 18.31 119.93 100.00%
03.02.06.05 CONCRETO f´c=210Kg/cm2 m3 0.42 581.72 244.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.42 244.32 100.00%
03.02.07 POZA DESIPADORA DE ENERGIA - CANGARI (08 UND)
03.02.07.01 LIMPIEZA Y DESBROSE MANUAL m2 46.20 0.91 42.04 11.55 7.05 16.76% 0.00 0.00% 11.55 10.51 25.00% 34.65 31.53 75.00%
03.02.07.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 19.51 4.54 88.58 4.88 18.79 21.21% 0.00 0.00% 4.88 22.16 25.01% 14.63 66.42 74.98%
03.02.07.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 21.85 30.32 662.49 5.46 110.24 16.64% 0.00 0.00% 5.46 165.55 24.99% 16.39 496.94 75.01%
03.02.07.04 REFINE, COMPACTACION Y NIVELACION m2 84.62 2.34 198.01 21.15 35.96 18.16% 0.00 0.00% 21.15 49.49 24.99% 63.47 148.52 75.01%
03.02.07.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 27.31 20.22 552.21 6.83 91.93 16.65% 0.00 0.00% 6.83 138.10 25.01% 20.48 414.11 74.99%
03.02.07.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 19.51 24.01 468.44 4.88 97.50 20.81% 0.00 0.00% 4.88 117.17 25.01% 14.63 351.27 74.99%
03.02.07.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 61.69 40.58 2,503.38 14.05 477.56 19.08% 0.00 0.00% 14.05 570.15 22.78% 47.64 1,933.23 77.22%
03.02.07.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 346.04 6.55 2,266.56 86.51 539.82 23.82% 0.00 0.00% 86.51 566.64 25.00% 259.53 1,699.92 75.00%
03.02.07.09 CONCRETO f´c=210Kg/cm2 m3 8.61 581.72 5,008.61 2.15 902.76 18.02% 0.00 0.00% 2.15 1,250.70 24.97% 6.46 3,757.91 75.03%
03.02.07.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 59.11 29.15 1,723.06 14.78 355.16 20.61% 0.00 0.00% 14.78 430.84 25.00% 44.33 1,292.22 75.00%
03.02.07.11 JUNTAS ASFALTICAS m 21.60 6.54 141.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 21.60 141.26 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.03 CANAL LATERAL 03 - CHIWA
03.03.01 CONSTRUCCION DEL CANAL LATERAL 03 - CHIWA 903.54 m.
03.03.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,056.00 0.91 960.96 1490.84 909.41 94.64% 0.00 0.00% 1490.84 1,356.66 141.18% -434.84 -395.70 -41.18%
03.03.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.50 9,074.25 4,537.13 0.5 4,034.73 88.93% 0.00 0.00% 0.5 4,537.13 100.00% 0.00 0.00 0.00%
03.03.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 344.99 30.32 10,460.10 773.91 15,625.24 149.38% 0.00 0.00% 773.91 23,464.95 224.33% -428.92 -13,004.85 -124.33%
03.03.01.04 REFINE, COMPACTACION Y NIVELACION m2 844.80 2.34 1,976.83 1092.67 1,857.54 93.97% 0.00 0.00% 1092.67 2,556.85 129.34% -247.87 -580.02 -29.34%
03.03.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 544.00 40.58 22,075.52 14.46 491.50 2.23% 0.00 0.00% 14.46 586.79 2.66% 529.54 21,488.73 97.34%
03.03.01.06 CONCRETO f´c=175Kg/cm2 m3 83.20 557.52 46,385.66 47.24 18,692.40 40.30% 0.00 0.00% 47.24 26,337.24 56.78% 35.96 20,048.42 43.22%
03.03.01.07 JUNTAS ASFALTICAS m 409.60 6.54 2,678.78 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 409.60 2,678.78 100.00%
03.03.01.08 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 115.20 25.96 2,990.59 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 115.20 2,990.59 100.00%
03.03.01.09 CURADO DE CONCRETO m2 448.00 0.49 219.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 448.00 219.52 100.00%
03.03.02 TOMA LATERAL TIPO I - CHIWA (26 UND)
03.03.02.01 LIMPIEZA Y DESBROSE MANUAL m2 78.00 0.91 70.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 78.00 70.98 100.00%
03.03.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 49.40 4.54 224.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 49.40 224.28 100.00%
03.03.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 6.64 30.32 201.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.64 201.32 100.00%
03.03.02.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 8.30 20.22 167.83 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.30 167.83 100.00%
03.03.02.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 85.91 56.94 4,891.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 85.91 4,891.72 100.00%
03.03.02.06 CONCRETO f´c=175Kg/cm2 m3 6.77 557.52 3,774.41 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.77 3,774.41 100.00%
03.03.02.07 JUNTAS ASFALTICAS m 66.56 6.54 435.30 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 66.56 435.30 100.00%
03.03.02.08 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 26.00 284.30 7,391.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 26.00 7,391.80 100.00%
03.03.03 AFORADOR PARSHALL - CANGARI (01 UND)
03.03.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.03.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.03.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.03.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.03.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.03.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.03.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.03.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.03.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.03.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.03.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.03.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.03.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.03.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.03.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.03.04 PASES PEATONALES - 05 UND
03.03.04.01 LIMPIEZA Y DESBROSE MANUAL m2 28.60 0.91 26.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 28.60 26.03 99.98%
03.03.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 22.00 4.54 99.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 22.00 99.88 100.00%
03.03.04.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 6.67 30.32 202.23 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.67 202.23 100.00%
03.03.04.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 0.99 21.92 21.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.99 21.70 100.00%
03.03.04.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 6.60 18.19 120.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.60 120.05 100.00%
03.03.04.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 2.64 331.36 874.79 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.64 874.79 100.00%
03.03.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 35.00 40.58 1,420.30 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 35.00 1,420.30 100.00%
03.03.04.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 156.07 6.55 1,022.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 156.07 1,022.26 100.00%
03.03.04.09 CONCRETO f´c=210Kg/cm2 m3 3.80 581.72 2,210.54 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.80 2,210.54 100.00%
03.03.04.10 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 15.00 18.64 279.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.00 279.60 100.00%
03.03.04.11 PINTURA LATEX 02 MANOS EN MUROS EXTERIORES m2 15.00 7.97 119.55 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.00 119.55 100.00%
03.03.05 POZA DESIPADORA DE ENERGIA - CANGARI (02 UND)
03.03.05.01 LIMPIEZA Y DESBROSE MANUAL m2 11.55 0.91 10.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.55 10.51 100.00%
03.03.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 4.88 4.54 22.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.88 22.16 99.98%
03.03.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 5.46 30.32 165.55 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.46 165.55 100.00%
03.03.05.04 REFINE, COMPACTACION Y NIVELACION m2 21.15 2.34 49.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 21.15 49.49 100.00%
03.03.05.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 6.83 18.19 124.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.83 124.24 100.00%
03.03.05.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 4.88 24.01 117.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.88 117.17 100.00%
03.03.05.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 15.42 40.58 625.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.42 625.74 100.00%
03.03.05.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 86.51 6.55 566.64 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 86.51 566.64 100.00%
03.03.05.09 CONCRETO f´c=210Kg/cm2 m3 2.15 581.72 1,250.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.15 1,250.70 100.00%
03.03.05.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 14.78 29.15 430.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.78 430.84 100.00%
03.03.05.11 JUNTAS ASFALTICAS m 5.40 6.54 35.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.40 35.32 99.99%
03.04 CANAL LATERAL 04 - CHIWA
03.04.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 04 - CHIWA
03.04.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,038.95 0.91 945.44 821.15 500.90 52.98% 0.00 0.00% 821.15 747.25 79.04% 217.80 198.20 20.96%
03.04.01.02 DEMOLICION MANUAL DE CONCRETO m3 2.05 60.65 124.33 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.05 124.33 100.00%
03.04.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.25 9,074.25 2,268.56 0.1 806.95 35.57% 0.00 0.00% 0.1 907.43 40.00% 0.15 1,361.14 60.00%
03.04.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 104.72 30.32 3,175.11 65.52 1,322.85 41.66% 0.00 0.00% 65.52 1,986.57 62.57% 39.20 1,188.54 37.43%
03.04.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 3.08 20.22 62.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.08 62.28 100.00%
03.04.01.06 REFINE, COMPACTACION Y NIVELACION m2 436.60 2.34 1,021.64 448.3 762.11 74.60% 0.00 0.00% 448.3 1,049.02 102.68% -11.70 -27.38 -2.68%
03.04.01.07 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 3.80 35.25 133.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.80 133.95 100.00%
03.04.01.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 253.20 40.58 10,274.86 131.81 4,480.22 43.60% 0.00 0.00% 131.81 5,348.85 52.06% 121.39 4,926.01 47.94%
03.04.01.09 CONCRETO f´c=175Kg/cm2 m3 37.28 557.52 20,784.35 33.59 13,291.23 63.95% 0.00 0.00% 33.59 18,727.10 90.10% 3.69 2,057.25 9.90%
03.04.01.10 JUNTAS ASFALTICAS m 205.48 6.54 1,343.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 205.48 1,343.84 100.00%
03.04.01.11 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 47.34 25.96 1,228.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 47.34 1,228.95 100.00%
03.04.01.12 CURADO DE CONCRETO m2 184.10 0.49 90.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 184.10 90.21 100.00%
03.04.02 TOMA LATERAL TIPO I - CHIWA (15 UND)
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.04.02.01 LIMPIEZA Y DESBROSE MANUAL m2 45.00 0.91 40.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 45.00 40.95 100.00%
03.04.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 28.50 4.54 129.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 28.50 129.39 100.00%
03.04.02.03 DEMOLICION MANUAL DE CONCRETO m3 1.22 60.65 73.99 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.22 73.99 100.00%
03.04.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 3.83 30.32 116.13 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.83 116.13 100.00%
03.04.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 4.93 20.22 99.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.93 99.68 100.00%
03.04.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 49.57 56.94 2,822.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 49.57 2,822.52 100.00%
03.04.02.07 CONCRETO f´c=175Kg/cm2 m3 4.18 557.52 2,330.43 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.18 2,330.43 100.00%
03.04.02.08 JUNTAS ASFALTICAS m 38.40 6.54 251.14 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 38.40 251.14 100.00%
03.04.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 15.00 284.30 4,264.50 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.00 4,264.50 100.00%
03.04.03 AFORADOR PARSHALL - CHIWA CL-04 (01 UND)
03.04.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.04.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.04.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.04.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.04.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.04.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.04.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.04.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.04.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.04.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.04.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.04.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.04.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.04.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.04.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.05 CANAL LATERAL 05 - CHIWA
03.05.01 CONSTRUCCION DEL CANAL LATERAL 05 - CHIWA (L=377M.)
03.05.01.01 LIMPIEZA Y DESBROSE MANUAL m2 600.60 0.91 546.55 569.25 347.24 63.53% 0.00 0.00% 569.25 518.02 94.78% 31.35 28.53 5.22%
03.05.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.25 9,074.25 2,268.56 0.15 1,210.42 53.36% 0.00 0.00% 0.15 1,361.14 60.00% 0.10 907.43 40.00%
03.05.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 193.58 30.32 5,869.35 193.58 3,908.38 66.59% 0.00 0.00% 193.58 5,869.35 100.00% 0.00 0.00 0.00%
03.05.01.04 REFINE, COMPACTACION Y NIVELACION m2 538.72 2.34 1,260.60 455.4 774.18 61.41% 0.00 0.00% 455.4 1,065.64 84.53% 83.32 194.97 15.47%
03.05.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 309.40 40.58 12,555.45 7.36 250.17 1.99% 0.00 0.00% 7.36 298.67 2.38% 302.04 12,256.78 97.62%
03.05.01.06 CONCRETO f´c=175Kg/cm2 m3 45.86 557.52 25,567.87 33.59 13,291.23 51.98% 0.00 0.00% 33.59 18,727.10 73.24% 12.27 6,840.77 26.76%
03.05.01.07 JUNTAS ASFALTICAS m 254.80 6.54 1,666.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 254.80 1,666.39 100.00%
03.05.01.08 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 32.76 25.96 850.45 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 32.76 850.45 100.00%
03.05.01.09 CURADO DE CONCRETO m2 254.80 0.49 124.85 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 254.80 124.85 100.00%
03.05.02 TOMA LATERAL TIPO I - CHIWA (12 UND)
03.05.02.01 LIMPIEZA Y DESBROSE MANUAL m2 36.00 0.91 32.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 36.00 32.76 100.00%
03.05.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 22.80 4.54 103.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 22.80 103.51 100.00%
03.05.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 3.06 30.32 92.78 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.06 92.78 100.00%
03.05.02.04 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 39.65 56.94 2,257.67 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 39.65 2,257.67 100.00%
03.05.02.05 CONCRETO f´c=175Kg/cm2 m3 3.49 557.52 1,945.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.49 1,945.74 100.00%
03.05.02.06 JUNTAS ASFALTICAS m 30.72 6.54 200.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.72 200.91 100.00%
03.05.02.07 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 12.00 284.30 3,411.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.00 3,411.60 100.00%
03.05.03 AFORADOR PARSHALL - CHIWA CL-05 (01 UND)
03.05.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.05.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.05.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.05.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.05.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.05.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.05.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.05.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.05.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.05.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.05.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.05.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.05.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.05.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.05.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.06 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 06 - VIRU VIRU
03.06.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 06 (SUBLATERAL 02 - 06 Y 01 - 06) VIRU VIRU.
03.06.01.01 LIMPIEZA Y DESBROSE MANUAL m2 2,535.23 0.91 2,307.06 1774.66 1,082.54 46.92% 0.00 0.00% 1774.66 1,614.94 70.00% 760.57 692.12 30.00%
03.06.01.02 DEMOLICION MANUAL DE CONCRETO m3 3.81 60.65 231.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.81 231.08 100.00%
03.06.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.50 9,074.25 4,537.13 0.05 403.47 8.89% 0.00 0.00% 0.05 453.71 10.00% 0.45 4,083.41 90.00%
03.06.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 48.82 30.32 1,480.22 4.05 81.77 5.52% 0.00 0.00% 4.05 122.80 8.30% 44.77 1,357.43 91.70%
03.06.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 5.71 20.22 115.46 5.06 68.11 58.99% 0.00 0.00% 5.06 102.31 88.61% 0.65 13.14 11.38%
03.06.01.06 REFINE, COMPACTACION Y NIVELACION m2 343.98 2.34 804.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 343.98 804.91 100.00%
03.06.01.07 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 15.00 35.25 528.75 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.00 528.75 100.00%
03.06.01.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 776.05 40.58 31,492.11 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 776.05 31,492.11 100.00%
03.06.01.09 CONCRETO f´c=175Kg/cm2 m3 33.26 557.52 18,543.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 33.26 18,543.12 100.00%
03.06.01.10 JUNTAS ASFALTICAS m 168.41 6.54 1,101.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 168.41 1,101.40 100.00%
03.06.01.11 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 32.04 25.96 831.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 32.04 831.76 100.00%
03.06.01.12 CURADO DE CONCRETO m2 249.20 0.49 122.11 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 249.20 122.11 100.00%
03.06.02 TOMA LATERAL TIPO I - VIRU VIRU (24 UND)
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.06.02.01 LIMPIEZA Y DESBROSE MANUAL m2 72.00 0.91 65.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 72.00 65.52 100.00%
03.06.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 45.60 4.54 207.02 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 45.60 207.02 100.00%
03.06.02.03 DEMOLICION MANUAL DE CONCRETO m3 2.15 60.65 130.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.15 130.40 100.00%
03.06.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 6.13 30.32 185.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.13 185.86 100.00%
03.06.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 7.92 20.22 160.14 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.92 160.14 100.00%
03.06.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 78.53 56.94 4,471.50 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 78.53 4,471.50 100.00%
03.06.02.07 CONCRETO f´c=175Kg/cm2 m3 6.98 557.52 3,891.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.98 3,891.49 100.00%
03.06.02.08 JUNTAS ASFALTICAS m 61.44 6.54 401.82 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 61.44 401.82 100.00%
03.06.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 24.00 284.30 6,823.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 24.00 6,823.20 100.00%
03.06.03 TOMA LATERAL TIPO II - VIRU VIRU (01 UND)
03.06.03.01 LIMPIEZA Y DESBROSE MANUAL m2 2.00 0.91 1.82 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 1.82 100.00%
03.06.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 4.54 6.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.50 6.81 100.00%
03.06.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 60.65 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.09 5.46 99.97%
03.06.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.51 30.32 15.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.51 15.46 100.02%
03.06.03.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.65 20.22 13.14 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.65 13.14 100.02%
03.06.03.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 6.14 56.94 349.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.14 349.61 100.00%
03.06.03.07 CONCRETO f´c=175Kg/cm2 m3 0.58 557.52 323.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.58 323.36 100.00%
03.06.03.08 JUNTAS ASFALTICAS m 2.56 6.54 16.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.56 16.74 100.01%
03.06.03.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 2.00 284.30 568.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 568.60 100.00%
03.06.04 AFORADOR PARSHALL - VIRU VIRU (01 UND)
03.06.04.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.06.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.06.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.06.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.06.04.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.06.04.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.06.04.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.06.04.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.06.04.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.06.04.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.06.04.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.06.04.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.06.04.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.06.04.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.06.04.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.06.05 PASES PEATONALES - VIRU VIRU (02 UND)
03.06.05.01 LIMPIEZA Y DESBROSE MANUAL m2 11.44 0.91 10.41 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.44 10.41 100.00%
03.06.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 8.80 4.54 39.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.80 39.95 100.01%
03.06.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.51 30.32 76.10 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.51 76.10 100.00%
03.06.05.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 0.40 21.92 8.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.40 8.77 99.98%
03.06.05.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 2.64 18.19 48.02 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.64 48.02 100.00%
03.06.05.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 1.06 331.36 351.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.06 351.24 100.00%
03.06.05.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.00 40.58 568.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.00 568.12 100.00%
03.06.05.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 62.43 6.55 408.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 62.43 408.92 100.00%
03.06.05.09 CONCRETO f´c=210Kg/cm2 m3 1.52 581.72 884.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.52 884.21 100.00%
03.06.05.10 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 6.00 18.64 111.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 111.84 100.00%
03.06.05.11 PINTURA LATEX 02 MANOS EN MUROS EXTERIORES m2 6.00 7.97 47.82 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 47.82 100.00%
03.06.06 POZA DESIPADORA DE ENERGIA - VIRU VIRU (01 UND)
03.06.06.01 LIMPIEZA Y DESBROSE MANUAL m2 5.78 0.91 5.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.78 5.26 100.00%
03.06.06.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 2.44 4.54 11.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 11.08 99.98%
03.06.06.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.73 30.32 82.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.73 82.77 100.00%
03.06.06.04 REFINE, COMPACTACION Y NIVELACION m2 10.58 2.34 24.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.58 24.76 99.99%
03.06.06.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 3.41 20.22 68.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.41 68.95 100.00%
03.06.06.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 2.44 24.01 58.58 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 58.58 100.01%
03.06.06.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 7.71 40.58 312.87 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.71 312.87 100.00%
03.06.06.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 43.25 6.55 283.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 43.25 283.29 100.00%
03.06.06.09 CONCRETO f´c=210Kg/cm2 m3 1.08 581.72 628.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.08 628.26 100.00%
03.06.06.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 7.39 29.15 215.42 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.39 215.42 100.00%
03.06.06.11 JUNTAS ASFALTICAS m 2.70 6.54 17.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.70 17.66 99.99%
03.06.07 PARTIDOR DE CAUDAL TIPO I - VIRU VIRU (01 UND)
03.06.07.01 LIMPIEZA Y DESBROSE MANUAL m2 2.25 0.91 2.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.25 2.05 99.88%
03.06.07.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.43 4.54 6.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.43 6.49 100.03%
03.06.07.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 60.65 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.09 5.46 99.97%
03.06.07.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.26 30.32 7.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.26 7.88 100.04%
03.06.07.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.32 20.22 6.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.32 6.47 100.01%
03.06.07.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 3.50 56.94 199.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.50 199.29 100.00%
03.06.07.07 CONCRETO f´c=175Kg/cm2 m3 0.29 557.52 161.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.29 161.68 100.00%
03.06.07.08 JUNTAS ASFALTICAS m 4.00 6.54 26.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 26.16 100.00%
03.06.07.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.65m. und 2.00 316.20 632.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 632.40 100.00%
03.07 MEJORAMIENTO DEL CANAL LATERAL 07 - VIRU VIRU
03.07.01 MEJORAMIENTO DEL CANAL LATERAL 07 - VIRU VIRU.
03.07.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,137.00 0.91 1,034.67 543 331.23 32.01% 0.00 0.00% 543 494.13 47.76% 594.00 540.54 52.24%
03.07.01.02 DEMOLICION MANUAL DE CONCRETO m3 4.79 60.65 290.51 1.1 44.42 15.29% 0.00 0.00% 1.1 66.72 22.96% 3.69 223.80 77.04%
03.07.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.05 9,074.25 453.71 0.05 403.47 88.93% 0.00 0.00% 0.05 453.71 100.00% 0.00 0.00 0.00%
03.07.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 7.19 20.22 145.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.19 145.38 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.07.01.05 REFINE, COMPACTACION Y NIVELACION m2 686.96 2.34 1,607.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 686.96 1,607.49 100.00%
03.07.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 399.50 40.58 16,211.71 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 399.50 16,211.71 100.00%
03.07.01.07 CONCRETO f´c=175Kg/cm2 m3 59.56 557.52 33,205.89 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 59.56 33,205.89 100.00%
03.07.01.08 JUNTAS ASFALTICAS m 343.68 6.54 2,247.67 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 343.68 2,247.67 100.00%
03.07.01.09 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 32.40 25.96 841.10 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 32.40 841.10 100.00%
03.07.01.10 CURADO DE CONCRETO m2 252.00 0.49 123.48 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 252.00 123.48 100.00%
03.07.02 TOMA LATERAL TIPO I - VIRU VIRU (03 UND)
03.07.02.01 LIMPIEZA Y DESBROSE MANUAL m2 9.00 0.91 8.19 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 8.19 100.00%
03.07.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 5.70 4.54 25.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.70 25.88 99.99%
03.07.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.28 60.65 16.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.28 16.98 100.01%
03.07.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.77 30.32 23.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.77 23.35 99.98%
03.07.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.99 20.22 20.02 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.99 20.02 99.99%
03.07.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 9.91 56.94 564.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.91 564.28 100.00%
03.07.02.07 CONCRETO f´c=175Kg/cm2 m3 0.87 557.52 485.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.87 485.04 100.00%
03.07.02.08 JUNTAS ASFALTICAS m 7.68 6.54 50.23 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.68 50.23 99.99%
03.07.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 3.00 284.30 852.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 852.90 100.00%
03.07.03 AFORADOR PARSHALL - VIRU VIRU (01 UND)
03.07.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.07.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.07.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.07.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.07.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.07.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.07.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.07.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.07.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.07.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.07.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.07.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.07.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.07.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.07.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.07.04 POZA DESIPADORA DE ENERGIA - VIRU VIRU (03 UND)
03.07.04.01 LIMPIEZA Y DESBROSE MANUAL m2 17.33 0.91 15.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.33 15.77 100.00%
03.07.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 7.32 4.54 33.23 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.32 33.23 100.01%
03.07.04.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 8.19 30.32 248.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.19 248.32 100.00%
03.07.04.04 REFINE, COMPACTACION Y NIVELACION m2 31.73 2.34 74.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 31.73 74.25 100.00%
03.07.04.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 10.24 20.22 207.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.24 207.05 100.00%
03.07.04.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 7.32 24.01 175.75 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.32 175.75 100.00%
03.07.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 23.13 40.58 938.62 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.13 938.62 100.00%
03.07.04.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 129.76 6.55 849.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 129.76 849.93 100.00%
03.07.04.09 CONCRETO f´c=210Kg/cm2 m3 3.23 581.72 1,878.96 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.23 1,878.96 100.00%
03.07.04.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 22.17 29.15 646.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 22.17 646.26 100.00%
03.07.04.11 JUNTAS ASFALTICAS m 8.10 6.54 52.97 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.10 52.97 100.01%
03.07.05 CAJAS DE INSPECCION
03.07.05.01 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 22.50 4.54 102.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 22.50 102.15 100.00%
03.07.05.02 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.25 30.32 68.22 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.25 68.22 100.00%
03.07.05.03 REFINE, COMPACTACION Y NIVELACION m2 11.25 2.34 26.33 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.25 26.33 99.98%
03.07.05.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 50.35 85.82 4,321.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 50.35 4,321.04 100.00%
03.07.05.05 CONCRETO f´c=175Kg/cm2 m3 5.05 557.52 2,815.48 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.05 2,815.48 100.00%
03.07.05.06 ACERO FY=4200 KG/CM2, GRADO 60 kg 59.00 6.55 386.45 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 59.00 386.45 100.00%
03.07.05.07 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 25.18 29.15 734.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 25.18 734.00 100.00%
03.07.06 CANAL ENTUBADO DEL KM 0+000 A 0+370
03.07.06.01 LIMPIEZA Y DESBROSE MANUAL m2 740.00 0.91 673.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 740.00 673.40 100.00%
03.07.06.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 370.00 4.54 1,679.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 370.00 1,679.80 100.00%
03.07.06.03 EXCAVACION EN METERIAL SUELTO m3 111.00 29.59 3,284.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 111.00 3,284.49 100.00%
03.07.06.04 REFINE, COMPACTACION Y NIVELACION m2 740.00 2.34 1,731.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 740.00 1,731.60 100.00%
03.07.06.05 PREPARACION Y TENDIDO DE CAMA DE APOYO m3 22.10 67.39 1,489.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 22.10 1,489.32 100.00%
03.07.06.06 RELLENO Y COMPACTACIÓN CON MATERIAL SELECCIONADO m3 33.30 44.20 1,471.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 33.30 1,471.86 100.00%
03.07.06.07 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 101.01 18.19 1,837.37 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 101.01 1,837.37 100.00%
03.07.06.08 SUMINISTRO E INST. TUBERIA PVC-UF/S-25 DIAM 8" m 370.00 200.17 74,062.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 370.00 74,062.90 100.00%
03.07.06.09 PRUEBA HIDRÁULICA EN TUBERIA PVC UF 8" m 370.00 3.22 1,191.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 370.00 1,191.40 100.00%
03.08 CANAL LATERAL 08 - CHACCO
03.08.01 CONSTRUCCION DEL CANAL LATERAL 08 - CHACCO (L=384m.)
03.08.01.01 LIMPIEZA Y DESBROSE MANUAL m2 633.60 0.91 576.58 633.6 386.50 67.03% 0.00 0.00% 633.6 576.58 100.00% 0.00 0.00 0.00%
03.08.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.25 9,074.25 2,268.56 0.15 1,210.42 53.36% 0.00 0.00% 0.15 1,361.14 60.00% 0.10 907.43 40.00%
03.08.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 270.01 30.32 8,186.70 270.01 5,451.50 66.59% 0.00 0.00% 270.01 8,186.70 100.00% 0.00 0.00 0.00%
03.08.01.04 REFINE, COMPACTACION Y NIVELACION m2 506.88 2.34 1,186.10 506.88 861.70 72.65% 0.00 0.00% 506.88 1,186.10 100.00% 0.00 0.00 0.00%
03.08.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 326.40 40.58 13,245.31 6.14 208.70 1.58% 0.00 0.00% 6.14 249.16 1.88% 320.26 12,996.15 98.12%
03.08.01.06 CONCRETO f´c=175Kg/cm2 m3 48.38 557.52 26,972.82 37.82 14,965.00 55.48% 0.00 0.00% 37.82 21,085.41 78.17% 10.56 5,887.41 21.83%
03.08.01.07 JUNTAS ASFALTICAS m 268.80 6.54 1,757.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 268.80 1,757.95 100.00%
03.08.01.08 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 34.56 25.96 897.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 34.56 897.18 100.00%
03.08.01.09 CURADO DE CONCRETO m2 268.80 0.49 131.71 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 268.80 131.71 100.00%
03.08.02 TOMA LATERAL TIPO I - CHACCO (04 UND)
03.08.02.01 LIMPIEZA Y DESBROSE MANUAL m2 12.00 0.91 10.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.00 10.92 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.08.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 7.60 4.54 34.50 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.60 34.50 100.01%
03.08.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.02 30.32 30.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.02 30.93 99.99%
03.08.02.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 1.28 18.19 23.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.28 23.28 100.01%
03.08.02.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 13.22 56.94 752.75 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.22 752.75 100.00%
03.08.02.06 CONCRETO f´c=175Kg/cm2 m3 1.16 557.52 646.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.16 646.72 100.00%
03.08.02.07 JUNTAS ASFALTICAS m 10.24 6.54 66.97 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.24 66.97 100.00%
03.08.02.08 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 4.00 284.30 1,137.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 1,137.20 100.00%
03.08.03 AFORADOR PARSHALL - CHACCO (01 UND)
03.08.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.08.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.08.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.08.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.08.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.08.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.08.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.08.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.08.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.08.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.08.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.08.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.08.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.08.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.08.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.08.04 POZA DESIPADORA DE ENERGIA - CHACCO (01 UND)
03.08.04.01 LIMPIEZA Y DESBROSE MANUAL m2 5.78 0.91 5.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.78 5.26 100.00%
03.08.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 2.44 4.54 11.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 11.08 99.98%
03.08.04.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.73 30.32 82.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.73 82.77 100.00%
03.08.04.04 REFINE, COMPACTACION Y NIVELACION m2 10.58 2.34 24.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.58 24.76 99.99%
03.08.04.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 3.41 18.19 62.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.41 62.03 100.00%
03.08.04.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 2.44 24.01 58.58 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 58.58 100.01%
03.08.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 7.71 40.58 312.87 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.71 312.87 100.00%
03.08.04.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 43.25 6.55 283.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 43.25 283.29 100.00%
03.08.04.09 CONCRETO f´c=210Kg/cm2 m3 1.08 581.72 628.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.08 628.26 100.00%
03.08.04.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 7.39 29.15 215.42 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.39 215.42 100.00%
03.08.04.11 JUNTAS ASFALTICAS m 2.70 6.54 17.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.70 17.66 99.99%
03.09 CANAL LATERAL 09 - CHACCO
03.09.01 CONSTRUCCION DEL CANAL LATERAL 09 (SUBLATERAL 01 - 09, 02 - 09 Y ,3-09) - CHACCO.
03.09.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,498.02 0.91 1,363.20 1498.02 913.79 67.03% 0.00 0.00% 1498.02 1,363.20 100.00% 0.00 0.00 0.00%
03.09.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.50 9,074.25 4,537.13 0.25 2,017.37 44.46% 0.00 0.00% 0.25 2,268.56 50.00% 0.25 2,268.56 50.00%
03.09.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 578.70 30.32 17,546.18 500.7 10,109.13 57.61% 0.00 0.00% 500.7 15,181.22 86.52% 78.00 2,364.96 13.48%
03.09.01.04 REFINE, COMPACTACION Y NIVELACION m2 1,198.41 2.34 2,804.28 1119.21 1,902.66 67.85% 0.00 0.00% 1119.21 2,618.95 93.39% 79.20 185.33 6.61%
03.09.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 771.80 40.58 31,319.64 14.53 493.81 1.58% 0.00 0.00% 14.53 589.63 1.88% 757.27 30,730.02 98.12%
03.09.01.06 CONCRETO f´c=175Kg/cm2 m3 114.39 557.52 63,774.71 56.55 22,376.27 35.09% 0.00 0.00% 56.55 31,527.76 49.44% 57.84 32,246.96 50.56%
03.09.01.07 JUNTAS ASFALTICAS m 635.60 6.54 4,156.82 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 635.60 4,156.82 100.00%
03.09.01.08 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 81.71 25.96 2,121.19 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 81.71 2,121.19 100.00%
03.09.01.09 CURADO DE CONCRETO m2 635.52 0.49 311.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 635.52 311.40 100.00%
03.09.02 TOMA LATERAL TIPO I - CHACCO (09 UND)
03.09.02.01 LIMPIEZA Y DESBROSE MANUAL m2 27.00 0.91 24.57 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.00 24.57 100.00%
03.09.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 17.10 4.54 77.63 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.10 77.63 100.01%
03.09.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.30 30.32 69.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.30 69.74 99.99%
03.09.02.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 2.87 18.19 52.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.87 52.21 99.99%
03.09.02.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 29.74 56.94 1,693.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 29.74 1,693.40 100.00%
03.09.02.06 CONCRETO f´c=175Kg/cm2 m3 2.62 557.52 1,460.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.62 1,460.70 100.00%
03.09.02.07 JUNTAS ASFALTICAS m 23.04 6.54 150.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.04 150.68 100.00%
03.09.02.08 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 9.00 284.30 2,558.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 2,558.70 100.00%
03.09.03 TOMA LATERAL TIPO II - CHACCO (02 UND)
03.09.03.01 LIMPIEZA Y DESBROSE MANUAL m2 8.00 0.91 7.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 7.28 100.00%
03.09.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 3.00 4.54 13.62 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 13.62 100.00%
03.09.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.19 60.65 11.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.19 11.52 100.03%
03.09.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.02 30.32 30.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.02 30.93 99.99%
03.09.03.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 1.30 18.19 23.65 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.30 23.65 99.99%
03.09.03.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 12.28 56.94 699.22 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.28 699.22 100.00%
03.09.03.07 CONCRETO f´c=175Kg/cm2 m3 1.11 557.52 618.85 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.11 618.85 100.00%
03.09.03.08 JUNTAS ASFALTICAS m 5.12 6.54 33.48 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.12 33.48 100.01%
03.09.03.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 4.00 284.30 1,137.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 1,137.20 100.00%
03.09.04 AFORADOR PARSHALL - CHACCO (01 UND)
03.09.04.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.09.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.09.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.09.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.09.04.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.09.04.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.09.04.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.09.04.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.09.04.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.09.04.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.09.04.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.09.04.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.09.04.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.09.04.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.09.04.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.09.05 POZA DESIPADORA DE ENERGIA - CHACCO (01 UND)
03.09.05.01 LIMPIEZA Y DESBROSE MANUAL m2 5.78 0.91 5.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.78 5.26 100.00%
03.09.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 2.44 4.54 11.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 11.08 99.98%
03.09.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.73 30.32 82.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.73 82.77 100.00%
03.09.05.04 REFINE, COMPACTACION Y NIVELACION m2 10.58 2.34 24.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.58 24.76 99.99%
03.09.05.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 3.41 18.19 62.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.41 62.03 100.00%
03.09.05.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 2.44 24.01 58.58 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 58.58 100.01%
03.09.05.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 7.71 40.58 312.87 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.71 312.87 100.00%
03.09.05.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 43.25 6.55 283.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 43.25 283.29 100.00%
03.09.05.09 CONCRETO f´c=210Kg/cm2 m3 1.08 581.72 628.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.08 628.26 100.00%
03.09.05.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 7.39 29.15 215.42 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.39 215.42 100.00%
03.09.05.11 JUNTAS ASFALTICAS m 2.70 6.54 17.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.70 17.66 99.99%
03.09.06 PARTIDOR DE CAUDAL TIPO II - CHACCO (01 UND)
03.09.06.01 LIMPIEZA Y DESBROSE MANUAL m2 2.25 0.91 2.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.25 2.05 99.88%
03.09.06.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 4.54 6.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.50 6.81 100.00%
03.09.06.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 60.65 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.09 5.46 99.97%
03.09.06.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.26 30.32 7.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.26 7.88 100.04%
03.09.06.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.32 20.22 6.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.32 6.47 100.01%
03.09.06.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 5.54 56.94 315.45 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.54 315.45 100.00%
03.09.06.07 CONCRETO f´c=175Kg/cm2 m3 0.38 557.52 211.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 211.86 100.00%
03.09.06.08 JUNTAS ASFALTICAS m 4.00 6.54 26.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 26.16 100.00%
03.09.06.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.65m. und 3.00 316.20 948.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 948.60 100.00%
03.10 CANAL LATERAL 10 - CHACCO
03.10.01 CONSTRUCCION DEL CANAL LATERAL 10 - CHACCO (L=236m.)
03.10.01.01 LIMPIEZA Y DESBROSE MANUAL m2 396.00 0.91 360.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 396.00 360.36 100.00%
03.10.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.50 9,074.25 4,537.13 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 4,537.13 100.00%
03.10.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 301.37 30.32 9,137.54 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 301.37 9,137.54 100.00%
03.10.01.04 REFINE, COMPACTACION Y NIVELACION m2 316.80 2.34 741.31 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 316.80 741.31 100.00%
03.10.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 204.00 40.58 8,278.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 204.00 8,278.32 100.00%
03.10.01.06 CONCRETO f´c=175Kg/cm2 m3 30.24 557.52 16,859.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.24 16,859.40 100.00%
03.10.01.07 JUNTAS ASFALTICAS m 168.00 6.54 1,098.72 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 168.00 1,098.72 100.00%
03.10.01.08 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 21.60 25.96 560.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 21.60 560.74 100.00%
03.10.01.09 CURADO DE CONCRETO m2 168.00 0.49 82.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 168.00 82.32 100.00%
03.10.02 TOMA LATERAL TIPO I - CHACCO (03 UND)
03.10.02.01 LIMPIEZA Y DESBROSE MANUAL m2 9.00 0.91 8.19 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 8.19 100.00%
03.10.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 5.70 4.54 25.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.70 25.88 99.99%
03.10.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.77 30.32 23.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.77 23.35 99.98%
03.10.02.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 0.96 18.19 17.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.96 17.46 100.01%
03.10.02.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 9.91 56.94 564.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.91 564.28 100.00%
03.10.02.06 CONCRETO f´c=175Kg/cm2 m3 0.87 557.52 485.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.87 485.04 100.00%
03.10.02.07 JUNTAS ASFALTICAS m 7.68 6.54 50.23 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.68 50.23 99.99%
03.10.02.08 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 3.00 284.30 852.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 852.90 100.00%
03.10.03 AFORADOR PARSHALL - CHACCO (01 UND)
03.10.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.10.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.10.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.10.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.10.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.10.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.10.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.10.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.10.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.10.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.10.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.10.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.10.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.10.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.10.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.10.04 POZA DISIPADORA DE ENERGIA - CHACCO (01 UND)
03.10.04.01 LIMPIEZA Y DESBROSE MANUAL m2 5.78 0.91 5.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.78 5.26 100.00%
03.10.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 2.44 4.54 11.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 11.08 99.98%
03.10.04.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.73 30.32 82.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.73 82.77 100.00%
03.10.04.04 REFINE, COMPACTACION Y NIVELACION m2 10.58 2.34 24.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.58 24.76 99.99%
03.10.04.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 3.41 18.19 62.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.41 62.03 100.00%
03.10.04.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 2.44 24.01 58.58 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 58.58 100.01%
03.10.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 7.71 40.58 312.87 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.71 312.87 100.00%
03.10.04.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 43.25 6.55 283.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 43.25 283.29 100.00%
03.10.04.09 CONCRETO f´c=210Kg/cm2 m3 1.08 581.72 628.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.08 628.26 100.00%
03.10.04.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 7.39 29.15 215.42 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.39 215.42 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.10.04.11 JUNTAS ASFALTICAS m 2.70 6.54 17.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.70 17.66 99.99%
03.11 CANAL LATERAL 11 - CHACCO
03.11.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 11 - CHACCO
03.11.01.01 LIMPIEZA Y DESBROSE MANUAL m2 607.98 0.91 553.26 607.98 370.87 67.03% 0.00 0.00% 607.98 553.26 100.00% 0.00 0.00 0.00%
03.11.01.02 DEMOLICION MANUAL DE CONCRETO m3 0.36 60.65 21.83 1.18 47.65 218.27% 0.00 0.00% 1.18 71.57 327.84% -0.82 -49.73 -227.82%
03.11.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.25 9,074.25 2,268.56 0.15 1,210.42 53.36% 0.00 0.00% 0.15 1,361.14 60.00% 0.10 907.43 40.00%
03.11.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 189.85 30.32 5,756.25 189.95 3,835.09 66.62% 0.00 0.00% 189.95 5,759.28 100.05% -0.10 -3.03 -0.05%
03.11.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.53 20.22 10.72 1.78 23.96 223.50% 0.00 0.00% 1.78 35.99 335.74% -1.25 -25.28 -235.77%
03.11.01.06 REFINE, COMPACTACION Y NIVELACION m2 403.53 2.34 944.26 394.48 670.62 71.02% 0.00 0.00% 394.48 923.08 97.76% 9.05 21.18 2.24%
03.11.01.07 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 0.96 35.25 33.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.96 33.84 100.00%
03.11.01.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 260.95 40.58 10,589.35 41.21 1,400.73 13.23% 0.00 0.00% 41.21 1,672.30 15.79% 219.74 8,917.05 84.21%
03.11.01.09 CONCRETO f´c=175Kg/cm2 m3 38.54 557.52 21,486.82 29.52 11,680.77 54.36% 0.00 0.00% 29.52 16,457.99 76.60% 9.02 5,028.83 23.40%
03.11.01.10 JUNTAS ASFALTICAS m 196.21 6.54 1,283.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 196.21 1,283.21 100.00%
03.11.01.11 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 27.59 25.96 716.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.59 716.24 100.00%
03.11.01.12 CURADO DE CONCRETO m2 306.60 0.49 150.23 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 306.60 150.23 100.00%
03.11.02 TOMA LATERAL TIPO I _SUBLATERAL 01-11 Y SUBLATERAL 03-11 DE CHACCO (07 UND)
03.11.02.01 LIMPIEZA Y DESBROSE MANUAL m2 21.00 0.91 19.11 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 21.00 19.11 100.00%
03.11.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 13.30 4.54 60.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.30 60.38 100.00%
03.11.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.79 30.32 54.27 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.79 54.27 100.01%
03.11.02.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 2.23 18.19 40.56 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.23 40.56 100.01%
03.11.02.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 23.13 56.94 1,317.02 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.13 1,317.02 100.00%
03.11.02.06 CONCRETO f´c=175Kg/cm2 m3 2.04 557.52 1,137.34 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.04 1,137.34 100.00%
03.11.02.07 JUNTAS ASFALTICAS m 17.92 6.54 117.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.92 117.20 100.00%
03.11.02.08 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 7.00 284.30 1,990.10 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.00 1,990.10 100.00%
03.11.03 AFORADOR PARSHALL - CHACCO (01 UND)
03.11.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.11.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.11.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.11.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.11.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.11.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.11.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.11.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.11.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.11.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.11.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.11.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.11.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.11.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.11.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.11.04 PARTIDOR DE CAUDAL TIPO II - CHACCO (01 UND)
03.11.04.01 LIMPIEZA Y DESBROSE MANUAL m2 2.25 0.91 2.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.25 2.05 99.88%
03.11.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 4.54 6.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.50 6.81 100.00%
03.11.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 60.65 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.09 5.46 99.97%
03.11.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.26 30.32 7.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.26 7.88 100.04%
03.11.04.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.32 20.22 6.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.32 6.47 100.01%
03.11.04.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 5.54 56.94 315.45 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.54 315.45 100.00%
03.11.04.07 CONCRETO f´c=175Kg/cm2 m3 0.42 557.52 234.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.42 234.16 100.00%
03.11.04.08 JUNTAS ASFALTICAS m 6.00 6.54 39.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 39.24 100.00%
03.11.04.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.65m. und 3.00 316.20 948.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 948.60 100.00%
03.11.05 POZA DESIPADORA DE ENERGIA (SUBLATERAL 01-11, 02-11 Y 03-11) (02 UND)
03.11.05.01 LIMPIEZA Y DESBROSE MANUAL m2 11.55 0.91 10.51 5.57 3.40 32.33% 0.00 0.00% 5.57 5.07 48.23% 5.98 5.44 51.78%
03.11.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 4.88 4.54 22.16 2.44 9.39 42.39% 0.00 0.00% 2.44 11.08 49.99% 2.44 11.08 49.99%
03.11.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 5.46 30.32 165.55 2.73 55.12 33.29% 0.00 0.00% 2.73 82.77 50.00% 2.73 82.77 50.00%
03.11.05.04 REFINE, COMPACTACION Y NIVELACION m2 21.15 2.34 49.49 10.58 17.99 36.34% 0.00 0.00% 10.58 24.76 50.02% 10.57 24.73 49.98%
03.11.05.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 6.83 18.19 124.24 3.41 41.30 33.24% 0.00 0.00% 3.41 62.03 49.93% 3.42 62.21 50.07%
03.11.05.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 4.88 24.01 117.17 2.43 48.55 41.44% 0.00 0.00% 2.43 58.34 49.79% 2.45 58.82 50.20%
03.11.05.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 15.42 40.58 625.74 7.71 262.06 41.88% 0.00 0.00% 7.71 312.87 50.00% 7.71 312.87 50.00%
03.11.05.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 86.51 6.55 566.64 43.28 270.07 47.66% 0.00 0.00% 43.28 283.48 50.03% 43.23 283.16 49.97%
03.11.05.09 CONCRETO f´c=210Kg/cm2 m3 2.15 581.72 1,250.70 1.07 449.28 35.92% 0.00 0.00% 1.07 622.44 49.77% 1.08 628.26 50.23%
03.11.05.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 14.78 29.15 430.84 7.39 177.58 41.22% 0.00 0.00% 7.39 215.42 50.00% 7.39 215.42 50.00%
03.11.05.11 JUNTAS ASFALTICAS m 5.40 6.54 35.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.40 35.32 99.99%
03.12 CANAL LATERAL 12 - CHACCO
03.12.01 MEJORAMIENTO DEL CANAL LATERAL 12 - CHACCO
03.12.01.01 LIMPIEZA Y DESBROSE MANUAL m2 3,061.17 0.91 2,785.66 2061.17 1,257.31 45.14% 0.00 0.00% 2061.17 1,875.66 67.33% 1,000.00 910.00 32.67%
03.12.01.02 DEMOLICION MANUAL DE CONCRETO m3 3.90 60.65 236.54 0.99 39.77 16.82% 0.00 0.00% 0.99 60.04 25.38% 2.91 176.49 74.61%
03.12.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.25 9,074.25 2,268.56 0.08 645.56 28.46% 0.00 0.00% 0.08 725.94 32.00% 0.17 1,542.62 68.00%
03.12.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 5.85 20.22 118.29 1.48 19.88 16.81% 0.00 0.00% 1.48 29.93 25.30% 4.37 88.36 74.70%
03.12.01.05 REFINE, COMPACTACION Y NIVELACION m2 133.32 2.34 311.97 46.2 78.54 25.18% 0.00 0.00% 46.2 108.11 34.65% 87.12 203.86 65.35%
03.12.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 88.74 40.58 3,601.07 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 88.74 3,601.07 100.00%
03.12.01.07 CONCRETO f´c=175Kg/cm2 m3 12.73 557.52 7,097.23 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.73 7,097.23 100.00%
03.12.01.08 JUNTAS ASFALTICAS m 65.28 6.54 426.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 65.28 426.93 100.00%
03.12.01.09 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 9.09 25.96 235.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.09 235.98 100.00%
03.12.01.10 CURADO DE CONCRETO m2 70.70 0.49 34.64 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 70.70 34.64 100.01%
03.12.02 TOMA LATERAL TIPO I CHACCO (09 UND)
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.12.02.01 LIMPIEZA Y DESBROSE MANUAL m2 27.00 0.91 24.57 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.00 24.57 100.00%
03.12.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 17.10 4.54 77.63 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.10 77.63 100.01%
03.12.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.84 60.65 50.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.84 50.95 99.99%
03.12.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.30 30.32 69.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.30 69.74 99.99%
03.12.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.97 20.22 60.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.97 60.05 100.01%
03.12.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 29.74 56.94 1,693.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 29.74 1,693.40 100.00%
03.12.02.07 CONCRETO f´c=175Kg/cm2 m3 2.62 557.52 1,460.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.62 1,460.70 100.00%
03.12.02.08 JUNTAS ASFALTICAS m 23.04 6.54 150.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.04 150.68 100.00%
03.12.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 9.00 284.30 2,558.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 2,558.70 100.00%
03.12.03 AFORADOR PARSHALL - CHACCO (01 UND)
03.12.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.12.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.12.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.12.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.12.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.12.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.12.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.12.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.12.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.12.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.12.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.12.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.12.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.12.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.12.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.12.04 REHABILITACION DE POZA DISIPADORA DE ENERGIA CL 12 - CHACCO (03 UND)
03.12.04.01 LIMPIEZA Y DESBROSE MANUAL m2 17.33 0.91 15.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.33 15.77 100.00%
03.12.04.02 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 0.98 15.16 14.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.98 14.86 99.98%
03.12.04.03 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 3.90 100.78 393.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.90 393.04 100.00%
03.12.04.04 SELLADO DE GRIETAS Y FISURAS ep=2cm m 6.00 50.51 303.06 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 303.06 100.00%
03.13 CANAL LATERAL 13 - AZANGARO GRANDE
03.13.01 MEJORAMIENTO CANAL LATERAL 13 - AZANGARO GRANDE
03.13.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,714.00 0.91 1,559.74 1714 1,045.54 67.03% 0.00 0.00% 1714 1,559.74 100.00% 0.00 0.00 0.00%
03.13.01.02 DEMOLICION MANUAL DE CONCRETO m3 10.00 60.65 606.50 25.51 1,030.09 169.84% 0.00 0.00% 25.51 1,547.18 255.10% -15.51 -940.68 -155.10%
03.13.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.25 9,074.25 2,268.56 0.1 806.95 35.57% 0.00 0.00% 0.1 907.43 40.00% 0.15 1,361.14 60.00%
03.13.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 15.00 20.22 303.30 38.27 515.11 169.84% 0.00 0.00% 38.27 773.82 255.13% -23.27 -470.52 -155.13%
03.13.01.05 REFINE, COMPACTACION Y NIVELACION m2 341.88 2.34 800.00 260.04 442.07 55.26% 0.00 0.00% 260.04 608.49 76.06% 81.84 191.51 23.94%
03.13.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 221.00 40.58 8,968.18 36.7 1,247.43 13.91% 0.00 0.00% 36.7 1,489.29 16.61% 184.30 7,478.89 83.39%
03.13.01.07 CONCRETO f´c=175Kg/cm2 m3 32.63 557.52 18,191.88 25.51 10,094.05 55.49% 0.00 0.00% 25.51 14,222.34 78.18% 7.12 3,969.54 21.82%
03.13.01.08 JUNTAS ASFALTICAS m 166.40 6.54 1,088.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 166.40 1,088.26 100.00%
03.13.01.09 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 23.31 25.96 605.13 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.31 605.13 100.00%
03.13.01.10 CURADO DE CONCRETO m2 181.30 0.49 88.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 181.30 88.84 100.00%
03.13.02 TOMA LATERAL TIPO I - AZANGARO GRANDE (11 UND)
03.13.02.01 LIMPIEZA Y DESBROSE MANUAL m2 33.00 0.91 30.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 33.00 30.03 100.00%
03.13.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 20.90 4.54 94.89 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 20.90 94.89 100.00%
03.13.02.03 DEMOLICION MANUAL DE CONCRETO m3 1.03 60.65 62.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.03 62.47 100.00%
03.13.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.81 30.32 85.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.81 85.20 100.00%
03.13.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 3.64 20.22 73.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.64 73.60 100.00%
03.13.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 36.35 56.94 2,069.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 36.35 2,069.77 100.00%
03.13.02.07 CONCRETO f´c=175Kg/cm2 m3 3.20 557.52 1,784.06 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.20 1,784.06 100.00%
03.13.02.08 JUNTAS ASFALTICAS m 28.16 6.54 184.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 28.16 184.17 100.00%
03.13.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 11.00 284.30 3,127.30 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.00 3,127.30 100.00%
03.13.03 AFORADOR PARSHALL - AZANGARO (01 UND)
03.13.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.13.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.13.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.13.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.13.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.13.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.13.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.13.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.13.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.13.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.13.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.13.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.13.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.13.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.13.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.13.04 REHABILITACION DE POZA DISIPADORA DE ENERGIA CL 13 - AZANGARO GRANDE (01 UND)
03.13.04.01 LIMPIEZA Y DESBROSE MANUAL m2 5.78 0.91 5.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.78 5.26 100.00%
03.13.04.02 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 0.33 15.16 5.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.33 5.00 100.06%
03.13.04.03 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 1.30 100.78 131.01 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.30 131.01 100.00%
03.13.04.04 SELLADO DE GRIETAS Y FISURAS ep=2cm m 2.00 50.51 101.02 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 101.02 100.00%
03.14 CANAL LATERAL 14 - AZANGARO 1
03.14.01 MEJORAMIENTO DEL CANAL LATERAL 14, SUBLATERAL (01 - 14, 02-01-14, 02-14, 01-01 -14) AZANGARO 1.
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.14.01.01 LIMPIEZA Y DESBROSE MANUAL m2 3,273.00 0.91 2,978.43 2595 1,582.95 53.15% 0.00 0.00% 2595 2,361.45 79.29% 678.00 616.98 20.71%
03.14.01.02 DEMOLICION MANUAL DE CONCRETO m3 50.05 60.65 3,035.53 53.43 2,157.50 71.08% 0.00 0.00% 53.43 3,240.53 106.75% -3.38 -205.00 -6.75%
03.14.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 1.00 9,074.25 9,074.25 0.15 1,210.42 13.34% 0.00 0.00% 0.15 1,361.14 15.00% 0.85 7,713.11 85.00%
03.14.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 76.57 20.22 1,548.25 77 1,036.42 66.94% 0.00 0.00% 77 1,556.94 100.56% -0.43 -8.69 -0.56%
03.14.01.05 REFINE, COMPACTACION Y NIVELACION m2 1,540.80 2.34 3,605.47 700.08 1,190.14 33.01% 0.00 0.00% 700.08 1,638.19 45.44% 840.72 1,967.28 54.56%
03.14.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 1,095.30 40.58 44,447.27 90.9 3,089.69 6.95% 0.00 0.00% 90.9 3,688.72 8.30% 1,004.40 40,758.55 91.70%
03.14.01.07 CONCRETO f´c=175Kg/cm2 m3 158.20 557.52 88,199.66 49.68 19,657.88 22.29% 0.00 0.00% 49.68 27,697.59 31.40% 108.52 60,502.07 68.60%
03.14.01.08 JUNTAS ASFALTICAS m 860.70 6.54 5,628.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 860.70 5,628.98 100.00%
03.14.01.09 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 110.70 25.96 2,873.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 110.70 2,873.77 100.00%
03.14.01.10 CURADO DE CONCRETO m2 861.00 0.49 421.89 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 861.00 421.89 100.00%
03.14.02 TOMA LATERAL TIPO I EN CL 14 (SUBLATERAL 01 - 14, 02-01-14, 02-14 Y 01-01 -14) - 14 und
03.14.02.01 LIMPIEZA Y DESBROSE MANUAL m2 42.00 0.91 38.22 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 42.00 38.22 100.00%
03.14.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 26.60 4.54 120.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 26.60 120.76 100.00%
03.14.02.03 DEMOLICION MANUAL DE CONCRETO m3 1.31 60.65 79.45 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.31 79.45 100.00%
03.14.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 3.58 30.32 108.55 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.58 108.55 100.00%
03.14.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 4.63 20.22 93.62 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.63 93.62 100.00%
03.14.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 46.26 56.94 2,634.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 46.26 2,634.04 100.00%
03.14.02.07 CONCRETO f´c=175Kg/cm2 m3 4.07 557.52 2,269.11 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.07 2,269.11 100.00%
03.14.02.08 JUNTAS ASFALTICAS m 35.84 6.54 234.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 35.84 234.39 100.00%
03.14.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 14.00 284.30 3,980.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.00 3,980.20 100.00%
03.14.03 AFORADOR PARSHALL - AZANGARO (01 UND)
03.14.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.14.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.14.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.14.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.14.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.14.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.14.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.14.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.14.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.14.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.14.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.14.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.14.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.14.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.14.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.14.04 REHABILITACION DE POZA DISIPADORA DE ENERGIA CL 14 - AZANGARO 1 (07 UND)
03.14.04.01 LIMPIEZA Y DESBROSE MANUAL m2 40.43 0.91 36.79 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 40.43 36.79 100.00%
03.14.04.02 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 2.28 15.16 34.56 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.28 34.56 100.01%
03.14.04.03 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 1.75 100.78 176.37 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.75 176.37 100.00%
03.14.04.04 SELLADO DE GRIETAS Y FISURAS ep=2cm m 7.00 50.51 353.57 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.00 353.57 100.00%
03.14.05 PARTIDOR DE CAUDAL TIPO I - AZANGARO 1 (03 UND)
03.14.05.01 LIMPIEZA Y DESBROSE MANUAL m2 6.75 0.91 6.14 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.75 6.14 100.04%
03.14.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 4.28 4.54 19.43 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.28 19.43 100.01%
03.14.05.03 DEMOLICION MANUAL DE CONCRETO m3 0.28 60.65 16.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.28 16.98 100.01%
03.14.05.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.77 30.32 23.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.77 23.35 99.98%
03.14.05.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.96 20.22 19.41 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.96 19.41 100.01%
03.14.05.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 9.91 56.94 564.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.91 564.28 100.00%
03.14.05.07 CONCRETO f´c=175Kg/cm2 m3 0.87 557.52 485.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.87 485.04 100.00%
03.14.05.08 JUNTAS ASFALTICAS m 12.00 6.54 78.48 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.00 78.48 100.00%
03.14.05.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.65m. und 6.00 316.20 1,897.20 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 1,897.20 100.00%
03.15 CANAL LATERAL 15 - AZANGARO
03.15.01 MEJORAMIENTO DEL CANAL LATERAL 15 DE AZANGARO.
03.15.01.01 LIMPIEZA Y DESBROSE MANUAL m2 842.00 0.91 766.22 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 842.00 766.22 100.00%
03.15.01.02 DEMOLICION MANUAL DE CONCRETO m3 27.38 60.65 1,660.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.38 1,660.60 100.00%
03.15.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.10 9,074.25 907.43 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.10 907.43 100.00%
03.15.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 41.07 20.22 830.44 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 41.07 830.44 100.00%
03.15.01.05 REFINE, COMPACTACION Y NIVELACION m2 366.96 2.34 858.69 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 366.96 858.69 100.00%
03.15.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 236.30 40.58 9,589.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 236.30 9,589.05 100.00%
03.15.01.07 CONCRETO f´c=175Kg/cm2 m3 35.03 557.52 19,529.93 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 35.03 19,529.93 100.00%
03.15.01.08 JUNTAS ASFALTICAS m 177.92 6.54 1,163.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 177.92 1,163.60 100.00%
03.15.01.09 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 25.02 25.96 649.52 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 25.02 649.52 100.00%
03.15.01.10 CURADO DE CONCRETO m2 194.60 0.49 95.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 194.60 95.35 100.00%
03.15.02 TOMA LATERAL TIPO I - AZANGARO (06 UND)
03.15.02.01 LIMPIEZA Y DESBROSE MANUAL m2 18.00 0.91 16.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 18.00 16.38 100.00%
03.15.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 11.40 4.54 51.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.40 51.76 99.99%
03.15.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.56 60.65 33.96 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.56 33.96 100.01%
03.15.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.53 30.32 46.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.53 46.39 100.00%
03.15.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 1.98 20.22 40.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.98 40.04 99.99%
03.15.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 19.83 56.94 1,129.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 19.83 1,129.12 100.00%
03.15.02.07 CONCRETO f´c=175Kg/cm2 m3 1.75 557.52 975.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.75 975.66 100.00%
03.15.02.08 JUNTAS ASFALTICAS m 16.36 6.54 106.99 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 16.36 106.99 100.00%
03.15.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 6.00 284.30 1,705.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 1,705.80 100.00%
03.15.03 AFORADOR PARSHALL - AZANGARO (01 UND)
03.15.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.15.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.15.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.15.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.15.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.15.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.15.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.15.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.15.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.15.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.15.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.15.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.15.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.15.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.15.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.16 CANAL LATERAL 16 - AZANGARO
03.16.01 MEJORAMIENTO DEL CANAL LATERAL 16 - AZANGARO
03.16.01.01 LIMPIEZA Y DESBROSE MANUAL m2 731.00 0.91 665.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 731.00 665.21 100.00%
03.16.01.02 DEMOLICION MANUAL DE CONCRETO m3 39.12 60.65 2,372.63 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 39.12 2,372.63 100.00%
03.16.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.08 9,074.25 725.94 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.08 725.94 100.00%
03.16.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 58.68 20.22 1,186.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 58.68 1,186.51 100.00%
03.16.01.05 REFINE, COMPACTACION Y NIVELACION m2 500.54 2.34 1,171.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 500.54 1,171.26 100.00%
03.16.01.06 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 91.44 35.25 3,223.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 91.44 3,223.26 100.00%
03.16.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 392.70 40.58 15,935.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 392.70 15,935.77 100.00%
03.16.01.08 CONCRETO f´c=175Kg/cm2 m3 53.81 557.52 30,000.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 53.81 30,000.15 100.00%
03.16.01.09 JUNTAS ASFALTICAS m 248.04 6.54 1,622.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 248.04 1,622.18 100.00%
03.16.01.10 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 90.18 25.96 2,341.07 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 90.18 2,341.07 100.00%
03.16.01.11 CURADO DE CONCRETO m2 701.40 0.49 343.69 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 701.40 343.69 100.00%
03.16.02 TOMA LATERAL TIPO I - CANAL LATERAL 16 AZANGARO (08 UND)
03.16.02.01 LIMPIEZA Y DESBROSE MANUAL m2 24.00 0.91 21.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 24.00 21.84 100.00%
03.16.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 15.20 4.54 69.01 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.20 69.01 100.00%
03.16.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.75 60.65 45.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.75 45.49 99.99%
03.16.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.04 30.32 61.85 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.04 61.85 100.00%
03.16.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.64 20.22 53.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.64 53.38 100.00%
03.16.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 26.44 56.94 1,505.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 26.44 1,505.49 100.00%
03.16.02.07 CONCRETO f´c=175Kg/cm2 m3 2.33 557.52 1,299.02 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.33 1,299.02 100.00%
03.16.02.08 JUNTAS ASFALTICAS m 20.48 6.54 133.94 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 20.48 133.94 100.00%
03.16.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 8.00 284.30 2,274.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 2,274.40 100.00%
03.16.03 AFORADOR PARSHALL - AZANGARO (01 UND)
03.16.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.16.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.16.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.16.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.16.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.16.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.16.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.16.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.16.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.16.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.16.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.16.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.16.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.16.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.16.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.17 CANAL LATERAL 17 DE AZANGARO
03.17.01 CONSTRUCCION DEL CANAL LATERAL 17 (SUBLATERALES 03 - 17, 01-17 Y 02-17) (Lt=801m.)
03.17.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,321.65 0.91 1,202.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,321.65 1,202.70 100.00%
03.17.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.40 9,074.25 3,629.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.40 3,629.70 100.00%
03.17.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 406.67 30.32 12,330.23 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 406.67 12,330.23 100.00%
03.17.01.04 REFINE, COMPACTACION Y NIVELACION m2 1,057.32 2.34 2,474.13 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,057.32 2,474.13 100.00%
03.17.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 681.70 40.58 27,663.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 681.70 27,663.39 100.00%
03.17.01.06 CONCRETO f´c=175Kg/cm2 m3 100.93 557.52 56,270.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 100.93 56,270.49 100.00%
03.17.01.07 JUNTAS ASFALTICAS m 513.28 6.54 3,356.85 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 513.28 3,356.85 100.00%
03.17.01.08 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 72.09 25.96 1,871.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 72.09 1,871.46 100.00%
03.17.01.09 CURADO DE CONCRETO m2 560.70 0.49 274.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 560.70 274.74 100.00%
03.17.02 TOMA LATERAL TIPO I - CL 17 (SUBLATERALES 03 - 17, 01-17 Y 02-17) 06 UND
03.17.02.01 LIMPIEZA Y DESBROSE MANUAL m2 18.00 0.91 16.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 18.00 16.38 100.00%
03.17.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 11.40 4.54 51.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.40 51.76 99.99%
03.17.02.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.53 30.32 46.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.53 46.39 100.00%
03.17.02.04 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 19.83 56.94 1,129.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 19.83 1,129.12 100.00%
03.17.02.05 CONCRETO f´c=175Kg/cm2 m3 1.75 557.52 975.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.75 975.66 100.00%
03.17.02.06 JUNTAS ASFALTICAS m 15.36 6.54 100.45 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.36 100.45 100.00%
03.17.02.07 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 6.00 284.30 1,705.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 1,705.80 100.00%
03.17.03 AFORADOR PARSHALL - AZANGARO (01 UND)
03.17.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.17.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.17.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.17.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.17.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.17.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.17.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.17.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.17.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.17.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.17.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.17.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.17.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.17.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.17.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.17.04 POZA DISIPADORA DE ENERGIA - AZANGARO (05 UND)
03.17.04.01 LIMPIEZA Y DESBROSE MANUAL m2 28.88 0.91 26.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 28.88 26.28 100.00%
03.17.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 12.19 4.54 55.34 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.19 55.34 100.00%
03.17.04.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 13.66 30.32 414.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.66 414.17 100.00%
03.17.04.04 REFINE, COMPACTACION Y NIVELACION m2 52.89 2.34 123.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 52.89 123.76 100.00%
03.17.04.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 17.07 18.19 310.50 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.07 310.50 100.00%
03.17.04.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 12.19 24.01 292.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.19 292.68 100.00%
03.17.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 38.56 40.58 1,564.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 38.56 1,564.76 100.00%
03.17.04.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 216.27 6.55 1,416.57 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 216.27 1,416.57 100.00%
03.17.04.09 CONCRETO f´c=210Kg/cm2 m3 5.38 581.72 3,129.65 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.38 3,129.65 100.00%
03.17.04.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 36.95 29.15 1,077.09 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 36.95 1,077.09 100.00%
03.17.04.11 JUNTAS ASFALTICAS m 13.50 6.54 88.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.50 88.29 100.00%
03.17.05 PARTIDOR DE CAUDAL TIPO II - AZANGARO (01 UND)
03.17.05.01 LIMPIEZA Y DESBROSE MANUAL m2 2.25 0.91 2.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.25 2.05 99.88%
03.17.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 4.54 6.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.50 6.81 100.00%
03.17.05.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.26 30.32 7.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.26 7.88 100.04%
03.17.05.04 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 0.32 18.19 5.82 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.32 5.82 100.01%
03.17.05.05 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 5.54 56.94 315.45 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.54 315.45 100.00%
03.17.05.06 CONCRETO f´c=175Kg/cm2 m3 0.42 557.52 234.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.42 234.16 100.00%
03.17.05.07 JUNTAS ASFALTICAS m 6.00 6.54 39.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 39.24 100.00%
03.17.05.08 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.65m. und 3.00 316.20 948.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 948.60 100.00%
03.18 CANAL LATERAL 18 - IRIBAMBA
03.18.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 18 (SUBLATERALES 01 - 18 Y 02 - 18) - IRIBAMBA
03.18.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,229.05 0.91 1,118.44 1229.05 749.72 67.03% 0.00 0.00% 1229.05 1,118.44 100.00% 0.00 0.00 0.00%
03.18.01.02 DEMOLICION MANUAL DE CONCRETO m3 15.37 60.65 932.19 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.37 932.19 100.00%
03.18.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.08 9,074.25 725.94 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.08 725.94 100.00%
03.18.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 64.95 30.32 1,969.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 64.95 1,969.28 100.00%
03.18.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 23.05 20.22 466.07 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.05 466.07 100.00%
03.18.01.06 REFINE, COMPACTACION Y NIVELACION m2 347.70 2.34 813.62 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 347.70 813.62 100.00%
03.18.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 224.40 40.58 9,106.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 224.40 9,106.15 100.00%
03.18.01.08 CONCRETO f´c=175Kg/cm2 m3 28.90 557.52 16,112.33 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 28.90 16,112.33 100.00%
03.18.01.09 JUNTAS ASFALTICAS m 168.96 6.54 1,105.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 168.96 1,105.00 100.00%
03.18.01.10 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 47.41 25.96 1,230.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 47.41 1,230.76 100.00%
03.18.01.11 CURADO DE CONCRETO m2 184.39 0.49 90.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 184.39 90.35 100.00%
03.18.02 TOMA LATERAL TIPO I CL 18 (SUBLATERALES 01 - 18 Y 02-18) IRIBAMBA - 09 UND.
03.18.02.01 LIMPIEZA Y DESBROSE MANUAL m2 27.00 0.91 24.57 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.00 24.57 100.00%
03.18.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 17.10 4.54 77.63 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.10 77.63 100.01%
03.18.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.66 60.65 40.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.66 40.03 100.00%
03.18.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.30 30.32 69.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.30 69.74 99.99%
03.18.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.95 20.22 59.65 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.95 59.65 100.00%
03.18.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 29.74 56.94 1,693.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 29.74 1,693.40 100.00%
03.18.02.07 CONCRETO f´c=175Kg/cm2 m3 2.62 557.52 1,460.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.62 1,460.70 100.00%
03.18.02.08 JUNTAS ASFALTICAS m 23.04 6.54 150.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.04 150.68 100.00%
03.18.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 9.00 284.30 2,558.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 2,558.70 100.00%
03.18.03 TOMA LATERAL TIPO II - CANAL SUBLATERAL 02-18 DE IRIBAMBAI (01 UND)
03.18.03.01 LIMPIEZA Y DESBROSE MANUAL m2 4.00 0.91 3.64 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 3.64 100.00%
03.18.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.50 4.54 6.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.50 6.81 100.00%
03.18.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 60.65 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.09 5.46 99.97%
03.18.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.51 30.32 15.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.51 15.46 100.02%
03.18.03.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 0.65 18.19 11.82 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.65 11.82 100.03%
03.18.03.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 6.14 56.94 349.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.14 349.61 100.00%
03.18.03.07 CONCRETO f´c=175Kg/cm2 m3 0.58 557.52 323.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.58 323.36 100.00%
03.18.03.08 JUNTAS ASFALTICAS m 2.56 6.54 16.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.56 16.74 100.01%
03.18.03.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 2.00 284.30 568.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 568.60 100.00%
03.18.04 AFORADOR PARSHALL - IRIBAMBA CL-18 (01 UND)
03.18.04.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.18.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.18.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.18.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.18.04.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.18.04.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.18.04.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.18.04.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.18.04.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.18.04.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.18.04.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.18.04.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.18.04.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.18.04.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.18.04.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.18.05 PARTIDOR DE CAUDAL TIPO I - IRIBAMBA (01 UND)
03.18.05.01 LIMPIEZA Y DESBROSE MANUAL m2 2.25 0.91 2.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.25 2.05 99.88%
03.18.05.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.43 4.54 6.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.43 6.49 100.03%
03.18.05.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 60.65 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.09 5.46 99.97%
03.18.05.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.26 30.32 7.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.26 7.88 100.04%
03.18.05.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.32 20.22 6.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.32 6.47 100.01%
03.18.05.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 3.30 56.94 187.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.30 187.90 100.00%
03.18.05.07 CONCRETO f´c=175Kg/cm2 m3 0.29 557.52 161.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.29 161.68 100.00%
03.18.05.08 JUNTAS ASFALTICAS m 4.00 6.54 26.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 26.16 100.00%
03.18.05.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.65m. und 2.00 316.20 632.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 632.40 100.00%
03.18.06 PASE VEHICULAR - IRIBAMBA (01 UND)
03.18.06.01 LIMPIEZA Y DESBROSE MANUAL m2 8.00 0.91 7.28 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 7.28 100.00%
03.18.06.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 8.00 4.54 36.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 36.32 100.00%
03.18.06.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 5.46 30.32 165.55 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.46 165.55 100.00%
03.18.06.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 3.15 21.92 69.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.15 69.05 100.00%
03.18.06.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 2.89 18.19 52.57 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.89 52.57 100.00%
03.18.06.06 CONCRETO CICLOPEO F'C=140 KG/CM2+30%PM m3 3.96 331.36 1,312.19 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.96 1,312.19 100.00%
03.18.06.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 11.60 40.58 470.73 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.60 470.73 100.00%
03.18.06.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 162.51 6.55 1,064.44 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 162.51 1,064.44 100.00%
03.18.06.09 CONCRETO f´c=210Kg/cm2 m3 1.88 581.72 1,093.63 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.88 1,093.63 100.00%
03.18.06.10 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 4.40 18.64 82.02 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.40 82.02 100.00%
03.18.06.11 PINTURA LATEX 02 MANOS EN MUROS EXTERIORES m2 4.40 7.97 35.07 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.40 35.07 99.99%
03.19 CANAL LATERAL 19 - IRIBAMBA
03.19.01 MEJORAMIENTO DEL CANAL LATERAL 19 (SUBLATERALES 02 - 19, 01 - 19, 01-01 - 19 y 02-01 - 19) - IRIBAMBA
03.19.01.01 LIMPIEZA Y DESBROSE MANUAL m2 3,966.00 0.91 3,609.06 3686 2,248.46 62.30% 0.00 0.00% 3686 3,354.26 92.94% 280.00 254.80 7.06%
03.19.01.02 DEMOLICION MANUAL DE CONCRETO m3 73.48 60.65 4,456.56 107.48 4,340.04 97.39% 0.00 0.00% 107.48 6,518.66 146.27% -34.00 -2,062.10 -46.27%
03.19.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 1.00 9,074.25 9,074.25 0.1 806.95 8.89% 0.00 0.00% 0.1 907.43 10.00% 0.90 8,166.83 90.00%
03.19.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 110.22 20.22 2,228.65 161.22 2,170.02 97.37% 0.00 0.00% 161.22 3,259.87 146.27% -51.00 -1,031.22 -46.27%
03.19.01.05 REFINE, COMPACTACION Y NIVELACION m2 1,693.84 2.34 3,963.59 1439.15 2,446.56 61.73% 0.00 0.00% 1439.15 3,367.61 84.96% 254.69 595.97 15.04%
03.19.01.06 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 117.83 35.25 4,153.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 117.83 4,153.51 100.00%
03.19.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 1,034.04 40.58 41,961.34 53.75 1,826.96 4.35% 0.00 0.00% 53.75 2,181.18 5.20% 980.29 39,780.17 94.80%
03.19.01.08 CONCRETO f´c=175Kg/cm2 m3 151.71 557.52 84,581.36 107.48 42,528.76 50.28% 0.00 0.00% 107.48 59,922.25 70.85% 44.23 24,659.11 29.15%
03.19.01.09 JUNTAS ASFALTICAS m 846.70 6.54 5,537.42 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 846.70 5,537.42 100.00%
03.19.01.10 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 201.42 25.96 5,228.86 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 201.42 5,228.86 100.00%
03.19.01.11 CURADO DE CONCRETO m2 783.30 0.49 383.82 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 783.30 383.82 100.00%
03.19.02 TOMA LATERAL TIPO I - IRIBAMBA (43 UND) - CL 19 Y SUS SUBLATERALES
03.19.02.01 LIMPIEZA Y DESBROSE MANUAL m2 129.00 0.91 117.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 129.00 117.39 100.00%
03.19.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 81.70 4.54 370.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 81.70 370.92 100.00%
03.19.02.03 DEMOLICION MANUAL DE CONCRETO m3 4.02 60.65 243.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.02 243.81 100.00%
03.19.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 10.98 30.32 332.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.98 332.91 100.00%
03.19.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 14.21 20.22 287.33 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.21 287.33 100.00%
03.19.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 142.09 56.94 8,090.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 142.09 8,090.60 100.00%
03.19.02.07 CONCRETO f´c=175Kg/cm2 m3 12.51 557.52 6,974.58 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 12.51 6,974.58 100.00%
03.19.02.08 JUNTAS ASFALTICAS m 110.08 6.54 719.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 110.08 719.92 100.00%
03.19.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 43.00 284.30 12,224.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 43.00 12,224.90 100.00%
03.19.03 AFORADOR PARSHALL - IRIBAMBA CL-19 (01 UND)
03.19.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.19.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.19.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.19.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.19.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.19.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.19.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.19.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.19.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.19.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.19.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.19.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.19.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.19.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.19.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.19.04 PARTIDOR DE CAUDAL TIPO I - CL 19 IRIBAMBA (05 UND)
03.19.04.01 LIMPIEZA Y DESBROSE MANUAL m2 11.25 0.91 10.24 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.25 10.24 99.98%
03.19.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 7.13 4.54 32.37 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.13 32.37 100.00%
03.19.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.47 60.65 28.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.47 28.51 99.98%
03.19.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.28 30.32 38.81 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.28 38.81 100.00%
03.19.04.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 1.65 20.22 33.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.65 33.36 100.01%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.19.04.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 16.52 56.94 940.65 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 16.52 940.65 100.00%
03.19.04.07 CONCRETO f´c=175Kg/cm2 m3 1.45 557.52 808.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.45 808.40 100.00%
03.19.04.08 JUNTAS ASFALTICAS m 20.00 6.54 130.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 20.00 130.80 100.00%
03.19.04.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.65m. und 10.00 316.20 3,162.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.00 3,162.00 100.00%
03.20 CANAL LATERAL 20 - BADO
03.20.01 MEJORAMIENTO DEL CANAL LATERAL 20 - BADO
03.20.01.01 LIMPIEZA Y DESBROSE MANUAL m2 1,740.00 0.91 1,583.40 1740 1,061.40 67.03% 0.00 0.00% 1740 1,583.40 100.00% 0.00 0.00 0.00%
03.20.01.02 DEMOLICION MANUAL DE CONCRETO m3 70.53 60.65 4,277.64 5.37 216.84 5.07% 0.00 0.00% 5.37 325.69 7.61% 65.16 3,951.95 92.39%
03.20.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.50 9,074.25 4,537.13 0.02 161.39 3.56% 0.00 0.00% 0.02 181.49 4.00% 0.48 4,355.64 96.00%
03.20.01.04 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 105.80 20.22 2,139.28 8.05 108.35 5.06% 0.00 0.00% 8.05 162.77 7.61% 97.75 1,976.51 92.39%
03.20.01.05 REFINE, COMPACTACION Y NIVELACION m2 1,511.40 2.34 3,536.68 70.1 119.17 3.37% 0.00 0.00% 70.1 164.03 4.64% 1,441.30 3,372.64 95.36%
03.20.01.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 974.10 40.58 39,528.98 5.76 195.78 0.50% 0.00 0.00% 5.76 233.74 0.59% 968.34 39,295.24 99.41%
03.20.01.07 CONCRETO f´c=175Kg/cm2 m3 144.27 557.52 80,433.41 5.37 2,124.86 2.64% 0.00 0.00% 5.37 2,993.88 3.72% 138.90 77,439.53 96.28%
03.20.01.08 JUNTAS ASFALTICAS m 733.44 6.54 4,796.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 733.44 4,796.70 100.00%
03.20.01.09 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 206.10 25.96 5,350.36 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 206.10 5,350.36 100.00%
03.20.01.10 CURADO DE CONCRETO m2 801.50 0.49 392.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 801.50 392.74 100.00%
03.20.02 TOMA LATERAL TIPO I - CANAL LATERAL 20 DE BADO (09 UND)
03.20.02.01 LIMPIEZA Y DESBROSE MANUAL m2 27.00 0.91 24.57 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 27.00 24.57 100.00%
03.20.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 17.10 4.54 77.63 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.10 77.63 100.01%
03.20.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.84 60.65 50.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.84 50.95 99.99%
03.20.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.30 30.32 69.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.30 69.74 99.99%
03.20.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.97 20.22 60.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.97 60.05 100.01%
03.20.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 29.74 56.94 1,693.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 29.74 1,693.40 100.00%
03.20.02.07 CONCRETO f´c=175Kg/cm2 m3 2.62 557.52 1,460.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.62 1,460.70 100.00%
03.20.02.08 JUNTAS ASFALTICAS m 23.04 6.54 150.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 23.04 150.68 100.00%
03.20.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 9.00 284.30 2,558.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 2,558.70 100.00%
03.20.03 AFORADOR PARSHALL - BADO CL-20 (01 UND)
03.20.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.20.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.20.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.20.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.20.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.20.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.20.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.20.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.20.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.20.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.20.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.20.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.20.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.20.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.20.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.20.04 REHABILITACION DE POZA DISIPADORA DE ENERGIA - BADO (02 UND)
03.20.04.01 LIMPIEZA Y DESBROSE MANUAL m2 11.55 0.91 10.51 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.55 10.51 100.00%
03.20.04.02 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 0.71 15.16 10.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.71 10.76 100.03%
03.20.04.03 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 2.50 100.78 251.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.50 251.95 100.00%
03.20.04.04 SELLADO DE GRIETAS Y FISURAS ep=2cm m 4.00 50.51 202.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 202.04 100.00%
03.21 CANAL LATERAL 21 - BADO
03.21.01 MEJORAMIENTO Y AMPLIACION DEL CANAL LATERAL 21 (SUBLATERALES 01 - 21 y 02 - 21) - BADO
03.21.01.01 LIMPIEZA Y DESBROSE MANUAL m2 928.05 0.91 844.53 928.05 566.11 67.03% 0.00 0.00% 928.05 844.53 100.00% 0.00 0.00 0.00%
03.21.01.02 DEMOLICION MANUAL DE CONCRETO m3 7.20 60.65 436.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.20 436.68 100.00%
03.21.01.03 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.25 9,074.25 2,268.56 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.25 2,268.56 100.00%
03.21.01.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 71.58 30.32 2,170.31 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 71.58 2,170.31 100.00%
03.21.01.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 10.80 20.22 218.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.80 218.38 100.00%
03.21.01.06 REFINE, COMPACTACION Y NIVELACION m2 401.89 2.34 940.42 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 401.89 940.42 100.00%
03.21.01.07 ADHESIVO PARA UNIR CONCRETO ANTIGUO Y NUEVO m2 31.45 35.25 1,108.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 31.45 1,108.61 100.00%
03.21.01.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 219.44 40.58 8,904.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 219.44 8,904.88 100.00%
03.21.01.09 CONCRETO f´c=175Kg/cm2 m3 63.96 557.52 35,658.98 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 63.96 35,658.98 100.00%
03.21.01.10 JUNTAS ASFALTICAS m 198.02 6.54 1,295.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 198.02 1,295.05 100.00%
03.21.01.11 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 101.70 25.96 2,640.13 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 101.70 2,640.13 100.00%
03.21.01.12 CURADO DE CONCRETO m2 395.50 0.49 193.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 395.50 193.80 100.00%
03.21.02 TOMA LATERAL TIPO I DEL CL 21 (SUBLATERALES 01 - 21 Y 02-21) - BADO 06 UND.
03.21.02.01 LIMPIEZA Y DESBROSE MANUAL m2 18.00 0.91 16.38 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 18.00 16.38 100.00%
03.21.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 11.40 4.54 51.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 11.40 51.76 99.99%
03.21.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.56 60.65 33.96 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.56 33.96 100.01%
03.21.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.53 30.32 46.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.53 46.39 100.00%
03.21.02.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 1.98 20.22 40.04 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.98 40.04 99.99%
03.21.02.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 19.83 56.94 1,129.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 19.83 1,129.12 100.00%
03.21.02.07 CONCRETO f´c=175Kg/cm2 m3 1.75 557.52 975.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.75 975.66 100.00%
03.21.02.08 JUNTAS ASFALTICAS m 15.36 6.54 100.45 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 15.36 100.45 100.00%
03.21.02.09 SUMINISTRO E INSTALACION DE COMPUERTA METALICA TIPO IZAJE 0.25 und 6.00 284.30 1,705.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 1,705.80 100.00%
03.21.03 AFORADOR PARSHALL - BADO CL-21 (01 UND)
03.21.03.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.21.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.21.03.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
03.21.03.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.21.03.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.21.03.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.21.03.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.21.03.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.21.03.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.21.03.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.21.03.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.21.03.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.21.03.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.21.03.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.21.03.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.21.04 PARTIDOR DE CAUDAL TIPO I - CL 21 BADO (01 UND)
03.21.04.01 LIMPIEZA Y DESBROSE MANUAL m2 2.25 0.91 2.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.25 2.05 99.88%
03.21.04.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 1.43 4.54 6.49 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.43 6.49 100.03%
03.21.04.03 DEMOLICION MANUAL DE CONCRETO m3 0.09 60.65 5.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.09 5.46 99.97%
03.21.04.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 0.26 30.32 7.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.26 7.88 100.04%
03.21.04.05 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 0.32 20.22 6.47 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.32 6.47 100.01%
03.21.04.06 ENCOFRADO Y DESENCOFRA CARAVISTA EN OBRAS HIDRAULICAS m2 3.30 56.94 187.90 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.30 187.90 100.00%
03.21.04.07 CONCRETO f´c=175Kg/cm2 m3 0.29 557.52 161.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.29 161.68 100.00%
03.21.04.08 JUNTAS ASFALTICAS m 4.00 6.54 26.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 26.16 100.00%
03.21.04.09 SUMINISTRO E INST. DE COMPUERTA METALICA TIPO IZAJE 0.40X0.65m. und 2.00 316.20 632.40 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 632.40 100.00%
03.21.05 REHABILITACION DE POZA DISIPADORA DE ENERGIA - BADO (03 UND) CL-21
03.21.05.01 LIMPIEZA Y DESBROSE MANUAL m2 17.33 0.91 15.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 17.33 15.77 100.00%
03.21.05.02 DESCOLMATACION MANUAL EN OBRAS DE ARTE m3 1.07 15.16 16.22 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.07 16.22 100.01%
03.21.05.03 RESANE EN MUROS, BASE Y PAÑOS DE CANAL e=2.5cm (C:A 1:2) m2 1.08 100.78 108.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.08 108.84 100.00%
03.21.05.04 SELLADO DE GRIETAS Y FISURAS ep=2cm m 2.40 50.51 121.22 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.40 121.22 100.00%
03.22 CANAL LATERAL 22 - BADO
03.22.01 CONSTRUCCION DEL CANAL LATERAL 22 - BADO)
03.22.01.01 LIMPIEZA Y DESBROSE MANUAL m2 237.60 0.91 216.22 237.6 144.94 67.03% 0.00 0.00% 237.6 216.22 100.00% 0.00 0.00 0.00%
03.22.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCI mes 0.05 9,074.25 453.71 0.05 403.47 88.93% 0.00 0.00% 0.05 453.71 100.00% 0.00 0.00 0.00%
03.22.01.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 109.57 30.32 3,322.16 109.57 2,212.22 66.59% 0.00 0.00% 109.57 3,322.16 100.00% 0.00 0.00 0.00%
03.22.01.04 REFINE, COMPACTACION Y NIVELACION m2 190.08 2.34 444.79 190.08 323.14 72.65% 0.00 0.00% 190.08 444.79 100.00% 0.00 0.00 0.00%
03.22.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 122.40 40.58 4,966.99 2.3 78.18 1.57% 0.00 0.00% 2.3 93.33 1.88% 120.10 4,873.66 98.12%
03.22.01.06 CONCRETO f´c=175Kg/cm2 m3 18.14 557.52 10,113.41 14.18 5,610.88 55.48% 0.00 0.00% 14.18 7,905.63 78.17% 3.96 2,207.78 21.83%
03.22.01.07 JUNTAS ASFALTICAS m 92.16 6.54 602.73 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 92.16 602.73 100.00%
03.22.01.08 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 25.92 25.96 672.88 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 25.92 672.88 100.00%
03.22.01.09 CURADO DE CONCRETO m2 100.80 0.49 49.39 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 100.80 49.39 100.00%
03.22.02 AFORADOR PARSHALL - CL 22 BADO (01 UND)
03.22.02.01 LIMPIEZA Y DESBROSE MANUAL m2 13.57 0.91 12.35 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.57 12.35 99.99%
03.22.02.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 6.74 4.54 30.60 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.74 30.60 100.00%
03.22.02.03 DEMOLICION MANUAL DE CONCRETO m3 0.38 60.65 23.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.38 23.05 99.99%
03.22.02.04 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 1.59 30.32 48.21 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.59 48.21 100.00%
03.22.02.05 REFINE, COMPACTACION Y NIVELACION m2 6.09 2.34 14.25 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.09 14.25 100.00%
03.22.02.06 ELIMINACION MANUAL DE MATERIAL PRODUCTO DE LA DEMOLICION Di m3 2.03 20.22 41.05 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.03 41.05 99.99%
03.22.02.07 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 3.12 24.01 74.91 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.12 74.91 100.00%
03.22.02.08 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.05 40.58 570.15 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 14.05 570.15 100.00%
03.22.02.09 ACERO FY=4200 KG/CM2, GRADO 60 kg 30.17 6.55 197.61 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 30.17 197.61 100.00%
03.22.02.10 CONCRETO f´c=210Kg/cm2 m3 0.85 581.72 494.46 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.85 494.46 100.00%
03.22.02.11 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 6.97 29.15 203.18 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.97 203.18 100.00%
03.22.02.12 TARRAJEO EN EXTERIORES, MEZCLA 1:5, E=1.5CM m2 1.81 18.64 33.74 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.81 33.74 100.00%
03.22.02.13 JUNTAS ASFALTICAS m 2.88 6.54 18.84 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.88 18.84 99.97%
03.22.02.14 SUMINISTRO E INST. DE LIMNIMETRO segun plano und 1.00 252.17 252.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 252.17 100.00%
03.22.02.15 SUMINISTRO E INST. DE REGLA GRADUADA segun plano und 1.00 232.17 232.17 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 232.17 100.00%
03.22.03 POZA DISIPADORA DE ENERGIA - BADO (01 UND)
03.22.03.01 LIMPIEZA Y DESBROSE MANUAL m2 5.78 0.91 5.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.78 5.26 100.00%
03.22.03.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 2.44 4.54 11.08 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 11.08 99.98%
03.22.03.03 EXCAVACION MANUAL EN METERIAL CONGLOMERADO m3 2.73 30.32 82.77 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.73 82.77 100.00%
03.22.03.04 REFINE, COMPACTACION Y NIVELACION m2 10.58 2.34 24.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.58 24.76 99.99%
03.22.03.05 ELIMINACION MANUAL DE MATERIAL EXEDENTE Dist. Prom.=50M. m3 3.41 18.19 62.03 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.41 62.03 100.00%
03.22.03.06 SOLADO DE CONCRETO 2", C:H - 1:10 (FC=100KG/CM2) m2 2.44 24.01 58.58 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.44 58.58 100.01%
03.22.03.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 7.71 40.58 312.87 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.71 312.87 100.00%
03.22.03.08 ACERO FY=4200 KG/CM2, GRADO 60 kg 43.25 6.55 283.29 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 43.25 283.29 100.00%
03.22.03.09 CONCRETO f´c=210Kg/cm2 m3 1.08 581.72 628.26 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.08 628.26 100.00%
03.22.03.10 TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:2, E=1.5CM m2 7.39 29.15 215.42 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 7.39 215.42 100.00%
03.22.03.11 JUNTAS ASFALTICAS m 2.70 6.54 17.66 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.70 17.66 99.99%
03.23 PRUEBAS DE LABORATORIO Y DISEÑO DE MEZCLA
03.23.01 ENSAYO DE MECANICA DE SUELOS und 13.00 380.00 4,940.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 13.00 4,940.00 100.00%
03.23.02 PRUEBA DE CALIDAD DEL CONCRETO und 200.00 30.00 6,000.00 50 1,500.00 25.00% 0.00 0.00% 50 1,500.00 25.00% 150.00 4,500.00 75.00%
03.23.03 DISEÑO DE MEZCLAS und 10.00 250.00 2,500.00 3 750.00 30.00% 0.00 0.00% 3 750.00 30.00% 7.00 1,750.00 70.00%
04 FLETE TERRESTRE
04.01 FLETE TERRESTRE
04.01.01 FLETE TERRESTRE POR PESO EN CAMION DE CARGA 10TON AYACUCHO - kg 296,330.89 0.07 20,743.16 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 296,330.89 20,743.16 100.00%
04.01.02 FLETE TERRESTRE DE CEMENTO EN CAMION VOLQUETE DE 15M3 HUANTA kg 1,511,045.00 0.04 60,441.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,511,045.00 60,441.80 100.00%
04.01.03 FLETE TERRESTRE POR VOLUMEN AYACUCHO - OBRA VJE 1.00 1,500.00 1,500.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 1,500.00 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
04.02 FLETE RURAL
04.02.01 ACARREO DE MATERIALES POR PESO A PIE DE OBRA CON CARRETILLA B kg 35,784.64 0.03 1,073.54 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 35,784.64 1,073.54 100.00%
04.02.02 ACARREO DE AGREGADOS A PIE DE OBRA CON CARRETILLA BUGUI - C m3 735.75 30.60 22,513.95 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 735.75 22,513.95 100.00%
04.02.03 ACARREO DE CEMENTO A PIE DE OBRA CON CARRETILLA BUGUI - CANA BOL 4,489.00 1.12 5,027.68 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4,489.00 5,027.68 100.00%
04.02.04 ACARREO DE MATERIALES POR PESO A PIE DE OBRA CON CARRETILLA kg 93,926.14 0.05 4,696.31 2000 60.00 1.28% 0.00 0.00% 2000 100.00 2.13% 91,926.14 4,596.31 97.87%
04.02.05 ACARREO DE AGREGADOS A PIE DE OBRA CON CARRETILLA BUGUI - m3 1,669.81 50.68 84,625.97 500 16,870.00 19.93% 0.00 0.00% 500 25,340.00 29.94% 1,169.81 59,285.97 70.06%
04.02.06 ACARREO DE CEMENTO A PIE DE OBRA CON CARRETILLA BUGUI - CAN BOL 10,487.20 1.86 19,506.19 2000 2,480.00 12.71% 0.00 0.00% 2000 3,720.00 19.07% 8,487.20 15,786.19 80.93%
05 PLAN DE MANEJO AMBIEMTAL
05.01 MEDIDAS DE MITIGACION Y CONTROL DE LOS IMPACTOS AMBIENTALES
05.01.01 ACONDICIONAMIENTO DE BOTADEROS m3 2,481.17 7.39 18,335.85 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2,481.17 18,335.85 100.00%
05.01.02 CHARLAS EN TEMAS AMBIENTALES AL PERSONAL DE LA OBRA TAL 4.00 1,275.00 5,100.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 5,100.00 100.00%
05.01.03 IMPLEMENTACIÓN Y ACONDICIONAMIENTO DE CONTENEDORES DE RESI und 10.00 632.30 6,323.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.00 6,323.00 100.00%
05.01.04 INSTALACION DE LETRINAS SANITARIA und 9.00 670.48 6,034.32 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 6,034.32 100.00%
05.01.05 MONITOREO DE CALIDAD DE AGUA und 4.00 700.00 2,800.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 4.00 2,800.00 100.00%
05.02 PLAN DE CONTINGENCIAS
05.02.01 CAPACITACION Y CONFORMACION DE BRIGADAS DE EMERGENCIA TAL 8.00 1,225.00 9,800.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 9,800.00 100.00%
05.02.02 RESPUESTA ANTE EMERGENCIAS mes 8.00 360.00 2,880.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 8.00 2,880.00 100.00%
05.03 PARTICIPACION CIUDADANA
05.03.01 CHARLA DE EDUCACION AMBIENTAL A LA POBLACION TAL 5.00 1,550.00 7,750.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.00 7,750.00 100.00%
05.03.02 APERTURA E INSTALCION DE BUZON DE SUGERENCIAS und 9.00 132.68 1,194.12 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 9.00 1,194.12 100.00%
05.04 PROGRAMA DE CIERRE Y ABANDONO
05.04.01 RESTAURACION DE AREAS AFECTADAS POR CAMPAMENTO m2 1,000.00 1.96 1,960.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,000.00 1,960.00 100.00%
05.04.02 RESTAURACION DE AREAS AFECTADAS POR PREPARACION DE CONCRET m2 1,500.00 2.94 4,410.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1,500.00 4,410.00 100.00%
05.04.03 CIERRE DE CONTENEDORES DE RESIDUOS SOLIDOS Y LETRINAS m2 114.00 11.78 1,342.92 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 114.00 1,342.92 100.00%
06 CAPACITACIONES Y FORTALECIMIENTO ORGANIZACIONAL
06.01 CAPACITACIONES
06.01.01 CAPACITACION EN OPERACIÓN Y MANTENIMIENTO DE LA INFRAESTRU TAL 5.00 614.74 3,073.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.00 3,073.70 100.00%
06.01.02 ELABORACION DEL PLAN DE DISTRIBUCION DEL AGUA EN EL SISTEMA und 1.00 11,950.00 11,950.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 11,950.00 100.00%
06.01.03 CAPACITACION EN OPERACIÓN DE LAS TOMAS LATERALES, AFORADOR TAL 5.00 614.74 3,073.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.00 3,073.70 100.00%
06.01.04 ASISTENCIA TECNICA Y ENTRENAMIENTO EN EL USO DEL AFORADOR Visita 6.00 501.24 3,007.44 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 3,007.44 100.00%
06.01.05 CAPACITACION EN TECNICAS DE RIEGO TAL 5.00 614.74 3,073.70 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 5.00 3,073.70 100.00%
06.02 FORTALECIMIENTO ORGANIZACIONAL DEL COMITÉ Y DE JUNTA DE USUARIOS
06.02.01 CAPACITACION EN MANEJO DE HERRAMIENTAS DE GESTION TAL 2.00 1,160.00 2,320.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 2,320.00 100.00%
06.02.02 CAPACITACION EN LEGISLACION Y NORMATIVIDAD DE AGUA TAL 2.00 1,080.00 2,160.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 2.00 2,160.00 100.00%
06.02.03 CAPACITACION EN ORGANIZACIÓN DE REGANTES (DEBERES Y DERECHO TAL 10.00 920.00 9,200.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 10.00 9,200.00 100.00%
06.02.04 EQUIPAMIENTO DE LA OFICINA CENTRAL DEL COMITÉ DE RIEGO jgo 1.00 12,114.00 12,114.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 12,114.00 100.00%
06.03 PASANTIA NACIONAL
06.03.01 PASANTIA NACIONAL (PROYECTO ESPECIAL CHAVIMOCHIC) VJE 1.00 27,720.00 27,720.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 27,720.00 100.00%
07 IMPLEMENTACION DEL PLAN DE VIGILANCIA, PREVENCION Y CONTROL DE COVID 19
07.01 FASE 1
07.01.01 TRABAJOS PRELIMINARES
07.01.01.01 ELABORACION DEL PLAN DE VIGILANCIA, PREVENCION Y CONTROL DE glb 1.00 1,800.00 1,800.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 1,800.00 100.00%
07.01.01.02 SUMINISTRO E INSTALACION DE LAVAMANOS glb 1.00 1,750.00 1,750.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 1,750.00 100.00%
07.01.01.03 ACONDICIONAMIENTO DE ZONAS DE CONTROL Y DESINFECCION (TOPI glb 1.00 7,170.00 7,170.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 7,170.00 100.00%
07.01.01.04 SERVICIO DE TRASLADO DE PERSONAL STAFF A OBRA glb 0.50 10,000.00 5,000.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 5,000.00 100.00%
07.01.01.05 SUELDOS DE PERSONAL OBRERO EN CUARENTENA mes 0.50 7,065.60 3,532.80 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 3,532.80 100.00%
07.01.01.06 SEGURIDAD EN HOSPEDAJES DE OBREROS mes 0.50 3,000.00 1,500.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 1,500.00 100.00%
07.01.01.07 ACONDICIONAMIENTO SANITARIO DE ALMACEN glb 1.00 3,000.00 3,000.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 3,000.00 100.00%
07.01.02 EQUIPOS DE BIOSEGURIDAD
07.01.02.01 MASCARILLA DE USO PERSONAL DESCARTABLE mes 0.50 600.00 300.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 300.00 100.00%
07.01.02.02 GUANTES DE LATEX (QUIRURGICOS) mes 0.50 240.00 120.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 120.00 100.00%
07.01.02.03 LENTES DE SEGURIDAD TIPO GOOGLE mes 0.50 960.00 480.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 480.00 100.00%
07.01.03 IMPLEMENTACION DE AREAS DE AISLAMIENTO SOCIAL DE PERSONAL OBRERO
07.01.03.01 ALQUILER DE VIVIENDAS PARA PERSONAL OBRERO mes 0.50 2,400.00 1,200.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 1,200.00 100.00%
07.01.03.02 ACONDICIONAMIENTO SANITARIO DE VIVIENDA glb 1.00 3,000.00 3,000.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 1.00 3,000.00 100.00%
07.01.03.03 ALIMENTACION DE PERSONAL OBRERO (DESAYUNO, ALMUERZO Y CEN mes 0.50 1,200.00 600.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 0.50 600.00 100.00%
07.02 FASE 2 - ADECUACIONES Y ADAPTACIONES
07.02.01 EQUIPOS DE BIOSEGURIDAD
07.02.01.01 MASCARILLA DE USO PERSONAL DESCARTABLE mes 6.00 600.00 3,600.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 3,600.00 100.00%
07.02.01.02 GUANTES DE LATEX (QUIRURGICOS) mes 6.00 240.00 1,440.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 1,440.00 100.00%
07.02.01.03 LENTES DE SEGURIDAD TIPO GOOGLE mes 6.00 960.00 5,760.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 5,760.00 100.00%
07.02.01.04 TRAJE IMPERMEABLE TIPO TYVET mes 6.00 2,280.00 13,680.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 13,680.00 100.00%
07.02.02 IMPLEMENTACION DE AREAS DE DESINFECCION
07.02.02.01 SUMINISTRO E INSTALACION DE LAVAMANOS mes 3.00 1,650.00 4,950.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 4,950.00 100.00%
07.02.02.02 SUMINISTRO E INSTALACION DE DUCHAS DE DESINFECCION mes 3.00 3,000.00 9,000.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 9,000.00 100.00%
07.02.02.03 CUADRILLA DE DESINFECCION DE AMBIENTES mes 3.00 829.92 2,489.76 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 2,489.76 100.00%
07.02.02.04 IMPLEMENTOS DE ASEO PERSONAL mes 3.00 660.00 1,980.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 1,980.00 100.00%
07.02.03 IMPLEMENTACION DE AREAS DE AISLAMIENTO SOCIAL DE PERSONAL OBRERO
07.02.03.01 ALQUILER DE VIVIENDAS PARA PERSONAL OBRERO mes 3.00 2,400.00 7,200.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 7,200.00 100.00%
07.02.03.02 ALIMENTACION DE PERSONAL OBRERO (DESAYUNO Y CENA) mes 3.00 800.00 2,400.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 2,400.00 100.00%
07.02.03.03 TRANSPORTE DE PERSONAL OBRERO mes 3.00 3,000.00 9,000.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 9,000.00 100.00%
07.02.03.04 SEGURIDAD EN HOSPEDAJES DE OBREROS mes 3.00 3,000.00 9,000.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 3.00 9,000.00 100.00%
07.02.04 PLAN DEL MANEJO DEL COVID
07.02.04.01 CUADRILLA COVID-19 mes 6.00 8,400.00 50,400.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 50,400.00 100.00%
07.02.04.02 PLAN DE MANEJO DE RESIDUOS USADOS PARA PROTECCION DE COVID- mes 6.00 3,050.00 18,300.00 0.00 0.00% 0.00 0.00% 0 0.00 0.00% 6.00 18,300.00 100.00%
AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO
PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
COSTO DIRECTO 6,605,375.60 403,842.65 6.11% 60,185.35 0.91% 613,026.66 9.28% 5,992,348.57 90.72%
GASTOS GENERALES 0.08 520,483.86 78,244.27 4,742.43 82,986.70 437,497.16
SUPERVISIÓN 0.04 240,570.00 27,110.72 2,191.97 29,302.69 211,267.31
GESTIÓN DEL PROYECTO 0.04 265,000.00 0.00 2,414.57 2,414.57 262,585.43
LIQUIDACIÓN 31,590.90 31,590.90
EXPEDIENTE TÉCNICO 180,000.00 180,000.00
PRESUPUESTO TOTAL 7,843,020.36 509,197.64 6.49% 69,534.32 0.89% 727,730.62 9.28% 7,115,289.38 90.72%
Fuente: Equipo Tecnico 2019.
ANEXO B N° 02
VALORIZACION DEL AVANCE FISICO DE OBRA DE ADICIONAL N° 01 1
Del 10 al 20 de Febrero - 2021

PROGRAMA REGIONAL DE IRRIGACIÓ N Y DESARROLLO RURAL INTEGRADO


SUPERVISOR DE OBRA : Ing. Wilfredo Molina Rojas
COMPONENTE :MEJORAMIENTO DEL SERVICIO DE AGUA EN EL SISTEMA DE RIEGO CANAL CACHI-HUANTA, DISTRITO DE
HUANTA-HUANTA AYACUCHO RESIDENTE DE OBRA : Ing. Pablo Vladimir Huamani Huamani
DEPARTAMENTO : AYACUCHO
:MEJORAMIENTO DEL SERVICIO DE AGUA EN EL SISTEMA DE RIEGO CANAL CACHI-HUANTA, DISTRITO DE
OBRA/META HUANTA-HUANTA AYACUCHO PROVINCIA : HUANTA
MONTO VALOR REFERENCIAL S/. 165,722.81 DISTRITO : IGUAIN
FUENTE FINANCIAMIENTO : RECURSOS ORDINARIOS
LUGAR : CCONONCCA-CANGARI
MES/AÑ O : FEBRERO 2021
FECHA DE
: 06 DE MARZO DEL 2021
PRESENTACIÓN

AVANCE ACUMULADO AVANCE ACTUALIZADO VALORIZACION ACUMULADO


PRESUPUESTO BASE S/. SALDO POR VALORIZAR

UND
PARTIDA DESCRIPCION ANTERIOR MENSUAL TOTAL
METRADO PRECIO PARCIAL S/. METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
01 OBRAS PRELIMINARES 900.00
1.02 MOVILIZACIÓN Y DESMOVILIZACIÓN DE MAQUINARIA UND 1.00 900.00 900.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 900.00 100.00%
2.00 CANAL DE CONDUCCIÓN (TRAPEZOIDAL) 139,158.63
2.01 OBRAS PRELIMINARES 7,795.53
02.01.01 LIMPIEZA DE TERRENO MANUAL M2 290.00 0.91 263.90 0.00 0.00 0.00% 290.00 263.90 100.00% 290.00 263.90 100.00% 0.00 0.00 0.00%
02.01.02 TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO DURANTE LA EJECUCION EN CANAL MES 0.83 9,074.25 7,531.63 0.00 0.00 0.00% 0.25 2,268.56 30.12% 0.25 2,268.56 30.12% 0.58 5,263.07 69.88%
2.02 MOVIMIENTO DE TIERRAS 48,066.69
02.02.01 CORTE DE TERRENO CON MAQINARIA M3 2,616.92 13.24 34,648.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,616.92 34,648.02 100.00%
02.02.02 REFINE, NIVELACIÓN Y COMPACTACIÓN M2 439.20 2.34 1,027.73 0.00 0.00 0.00% 244.00 0.00 0.00% 0.00 0.00 0.00% 439.20 1,027.73 100.00%
02.02.03 RELLENO CON MATERIAL PROPIO M3 565.28 21.92 12,390.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 565.28 12,390.94 100.00%
2.03 OBRAS DE CONCRETO 82,338.96
02.03.01 ENCOFRADO Y DESENCOFRADO EN OBRAS DE ARTE UND 439.20 40.58 17,822.74 0.00 0.00 0.00% 152.26 6,178.71 34.67% 152.26 6,178.71 34.67% 286.94 11,644.03 65.33%
02.03.01 CONCRETO f'c=175 kg/cm2 M3 115.72 557.52 64,516.22 0.00 0.00 0.00% 19.06 10,626.33 16.47% 19.06 10,626.33 16.47% 96.66 53,889.88 83.53%
2.04 JUNTAS 957.46
02.04.01 JUNTA DE DILATACIÓN M 146.40 6.54 957.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 146.40 957.46 100.00%
3.00 MITIGACIÓN AMBIENTAL 2,740.98
3.01 REVEGETACIÓN CON PLANTAS DE LA ZONA 2,740.98
03.01.01 COMPRA DE PLANTONES (nativas de la zona) UND 30.00 2.50 75.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.00 75.00 100.00%
03.01.02 HABILITACIÓN HOYO PARA PLANTACION DE PLANTAS (apertura de hoyos) HOYOS 30.00 10.78 323.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.00 323.40 100.00%
03.01.01 PLANTACION DE PLANTONES UND 30.00 14.33 429.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.00 429.90 100.00%
03.01.04 HABILITACIÓN DE LETRINAS SANITARIAS UND 1.00 1,775.12 1,775.12 0.00 0.00 0.00% 1.00 1,775.12 100.00% 1.00 1,775.12 100.00% 0.00 0.00 0.00%
03.01.05 CLAUSURA DE LETRINAS SANITARIOS UND 1.00 137.56 137.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 137.56 100.00%
4.00 FLETE 1,836.40
4.01 FLETE TERRESTRE 1,836.40
04.01.01 FLETE TERRESTRE GLB 1.00 1,836.40 1,836.40 0.00 0.00 0.00% 0.50 918.20 50.00% 0.50 918.20 50.00% 0.50 918.20 50.00%
COSTO DIRECTO 144,636.01 0.00 0.00% 22,030.82 15.23% 22,030.82 15.23% 122,605.18 84.77%
GASTOS GENERALES 15,571.82 0.00 2,371.89 2,371.89 13,199.93
GASTOS DE SUPERVISION Y LIQUIDACION 5,514.98 0.00 840.04 840.04 4,674.94
PRESUPUESTO TOTAL 165,722.81 0.00 0.00% 25,242.75 15.23% 25,242.75 15.23% 140,480.05 84.77%
Fuente: Equipo Tecnico 2021.
RESUMEN DE VALORIZACIONES ADICIONAL N° 01 - 2021

PROGRAMA REGIONAL DE IRRIGACIÓ N Y DESARROLLO RURAL INTEGRADO

COMPONENTE :MEJORAMIENTO DEL SERVICIO DE AGUA EN EL SISTEMA DE RIEGO CANAL CACHI-HUANTA, DISTRITO DE HUANTA-HUANTA
AYACUCHO
OBRA/META :MEJORAMIENTO DEL SERVICIO DE AGUA EN EL SISTEMA DE RIEGO CANAL CACHI-HUANTA, DISTRITO DE HUANTA-HUANTA
AYACUCHO
MONTO VALOR REFERENCIAL S/. 165,722.81 SUPERVISOR DE OBRA : Ing. Wilfredo Molina Rojas

ASIGNACIÓ N PRESUPUESTAL RESIDENTE DE OBRA : Ing. Pablo Vladimir Huamani Huamani


S/. 165,722.81
EJECUCIÓ N PRESUPUESTAL DIRECTA S/. 165,722.81 DEPARTAMENTO : AYACUCHO
FUENTE FINANCIAMIENTO : RECURSOS ORDINARIOS PROVINCIA : HUANTA
MES/AÑ O : FEBRERO DEL 2021 DISTRITO : IGUAIN
LUGAR : CCONONCCA- CANAGARI

AVANCE ANTERIOR TOTAL AVANCE ACTUAL AVANCE ACUMULADO


PRESUPUESTO
DESCRIPCION
(S/.) VALORIZACION VALORIZACION VALORIZACION
% % %
(S/.) (S/.) (S/.)

COSTO DIRECTO 144,636.01 0.00 0.00% 22,030.82 15.23% 22,030.82 15.23%


GASTOS GENERALES 15,571.82 0.00 2,371.89 2,371.89
SUPERVISIÓN 5,514.98 0.00 840.04 840.04
TOTAL (S/.) 165,722.81 0.00 0.00% 25,242.75 15.23% 25,242.75 15.23%

El avance fisico al mes de febrero es de S/. 24,940.37 Soles, la cual representa al 15.05% con respecto al Expediente Técnico adicional, el expediente tecnico comprende
un un monto de S/ 165,722.81 nuevos soles.
SECCION DEL CANAL ACTUAL-CCONONCCA
18.75456
GOBIERNO REGIONAL DE AYACUCHO
PROGRAMA REGIONAL DE IRRIGACION Y DESARROLLO RURAL INTEGRADO - PRIDER

FICHA TECNICA DEL PROYECTO


mes de NOVIEMBRE - 2020

DATOS GENERALES

UBICACIÓN NOMBRE DEL PROYECTO UNIDAD EJECUTORA


DPTO. AYACUCHO
PROV. HUANTA PRIDER
MEJORAMIENTO DEL SERVICIO DE AGUA EN EL SISTEMA DE RIEGO CANAL CACHI-
DISTR. HUANTA HUANTA, DISTRITO DE HUANTA-HUANTA AYACUCHO
MODALIDAD: ADMINISTRACION DIRECTA
LOCALD. PACCOSA, AZANGARO
PERFIL EXPEDIENTE TECNICO
CODIGO CUI 2435551 RES. APROB. VARIACION DE LA VIABILIDAD PLAZO DE EJECUCION
MONTO 5,079,565.00 MONTO 165,722.81
8 MESES
FECHA 7/15/2015 FECHA

INFORMACION DE AGENTES
N° AGENTE CARGO ESPECIALIDAD COLEGIATURA RESOLUCION
1.00 ING. JEAN PIERRE RICARDO SERPA SANTA CRUZ RESIDENTE 168017
2.00 ING. WILFREDO MOLINA ROJAS SUPERVISOR

PLAZO DE EJECUCION
FECHA DE INICIO PARALIZACION FECHA DE REINICIO TIEMPO DE EJEC. FECHA TERM. REAL

METAS ESTRUCTURA DE PPTO SEGÚN EXP. TECNICO


DURANTE EL MES DE NOVIEMBRE DEL 2020 SE REINICIA Y CONTINUA CON LA EJECUCION DE LA OBRA COSTO DIRECTO 144,636.01
GASTOS GENERALES 15,571.82
SUPERVISIÓN 5,514.98
#REF! #REF!
PARTIDAS EJECUTADAS OBRA PRINCIPAL: MEJORAMIENTO DEL CANAL PRINCIPAL CACHI HUANTA (42.645 km)
#REF! #REF!
#REF! #REF!
TOTAL (S/.) #REF!
RESUMEN DE VALORIZACIONES Nº 01 - 2020

PROGRAMA REGIONAL DE IRRIGACIÓ N Y DESARROLLO RURAL INTEGRADO

COMPONENTE :MEJORAMIENTO DEL SERVICIO DE AGUA EN EL SISTEMA DE RIEGO CANAL CACHI-HUANTA, DISTRITO DE HUANTA-HUANTA
AYACUCHO
OBRA/META :MEJORAMIENTO DEL SERVICIO DE AGUA EN EL SISTEMA DE RIEGO CANAL CACHI-HUANTA, DISTRITO DE HUANTA-HUANTA
AYACUCHO
MONTO VALOR REFERENCIAL S/. 0.00 SUPERVISOR DE OBRA : Ing. Wilfredo Molina Rojas
ASIGNACIÓ N PRESUPUESTAL S/. 850,000.00 RESIDENTE DE OBRA : Ing. Jean Pierre Ricardo Serpa Santa Cruz
EJECUCIÓ N PRESUPUESTAL DIRECTA S/. 850,000.00 DEPARTAMENTO : AYACUCHO
FUENTE FINANCIAMIENTO : RECURSOS ORDINARIOS PROVINCIA : HUANTA
MES/AÑ O : NOVIEMBRE 2020 DISTRITO : HUANTA
LUGAR : PACCOSAN, AZANGARO.

AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO


PRESUPUESTO
DESCRIPCION
(S/.) VALORIZACION VALORIZACION VALORIZACION
% % %
(S/.) (S/.) (S/.)

COSTO DIRECTO 6,605,375.60 464,028.00 60,185.35 524,213.36


GASTOS GENERALES 520,483.86 82,986.70 4,742.43 87,729.12
SUPERVISIÓN 240,570.00 29,302.69 2,191.97 31,494.66
GESTIÓN DEL PROYECTO 265,000.00 2,414.57 2,414.57 4,829.13
LIQUIDACIÓN 31,590.90 0.00 0.00 0.00
EXPEDIENTE TÉCNICO 180,000.00 0.00 0.00 0.00
TOTAL (S/.) 7,843,020.36 578,731.96 69,534.32 0.91% 648,266.27 7.94%