RESUMEN DE METRADOS DE ESTRUCTURAS

PROYECTO:

Descripcion
Item Unid METRADO TOTAL
Partida

RESUMEN DE HOJA DE METRADO


Descripcion
Item Unid METRADO TOTAL
Partida

RESUMEN DE HOJA DE METRADO


Descripcion
Item Unid METRADO TOTAL
Partida

RESUMEN DE HOJA DE METRADO


HOJA DE METRADOS GENERALES
PROYECTO:

Descripcion N° de N° de Dimensiones
Item Unid Sub - Total Total
Partida Elementos Veces Largo (m) Ancho (m) Alto (m)
1.00 TRAZOS, NIVELES Y REPLANTEO
1.10 TRAZO NIVEL Y REPLANTEO PRELIMINAR m2 1072.00
BLOQUE I "CENTRO EDUCATIVO" m2 1.00 1.00 1072.00 1072.00
1.1.2 TRAZO , NIVEL Y REPLANTEO DURANTE EL PROCESO. 1072.00
BLOQUE I "CENTRO EDUCATIVO" m2 1.00 1.00 1072.00 1072.00
2.00 ESTRUCTURAS
2.1 MOVIMIENTO DE TIERRAS
2.1.1 EXCAVACIONES m3
2.1.1.1 EXCAVACION SIMPLE O MANUAL m3 96.14

2.1.1.1.1 ZAPATAS m3 78.24


Z-1 m3 1.00 4.00 1.80 1.80 1.45 18.79 18.79
z-2 m3 1.00 2.00 2.20 1.80 1.45 11.48 11.48
Z-3 m3 1.00 5.00 2.20 2.20 1.45 35.09 35.09
z-4 m3 1.00 1.00 2.75 1.20 1.45 4.79 4.79
Z-5 m3 1.00 1.00 3.10 1.80 1.45 8.09 8.09
2.1.1.1.2 VIGAS DE CONEXIÓN m3 15.00
eje G-G entre tramo 1-2 m3 1.00 1.00 2.72 0.30 1.05 0.86 0.86
eje 1-1 entre tramo F-G m3 1.00 1.00 3.15 0.25 1.05 0.83 0.83
eje 2-2 entre tramo F-G m3 1.00 1.00 2.75 0.25 1.05 0.72 0.72
eje F-F entre tramo 1-2 m3 1.00 1.00 3.12 0.30 1.05 0.98 0.98
eje 2-2 entre tramo E-F m3 1.00 1.00 2.90 0.25 1.05 0.76 0.76
eje 1-1 entre tramo E-F m3 1.00 1.00 3.30 0.25 1.05 0.87 0.87
eje E-E entre tramo 1-2 m3 1.00 1.00 3.12 0.30 1.05 0.98 0.98
eje 2-2 entre tramo D-E m3 1.00 1.00 2.90 0.25 1.05 0.76 0.76
eje 1-1- entre tramo D-E m3 1.00 1.00 3.30 0.25 1.05 0.87 0.87
eje D-D entre tramo 1-2 m3 1.00 1.00 3.12 0.30 1.05 0.98 0.98
eje 2-2 entre tramo C-D m3 1.00 1.00 2.72 0.25 1.05 0.71 0.71
eje 1-1 entre tramo C-D m3 1.00 1.00 3.15 0.25 1.05 0.83 0.83
eje C-C entre tramo 1-2 m3 1.00 1.00 2.72 0.30 1.05 0.86 0.86
eje 2-2 entre tramo B-C m3 1.00 1.00 1.45 0.25 1.05 0.38 0.38
eje 1-1 entre tramo B-C m3 1.00 1.00 1.63 0.25 1.05 0.43 0.43
eje B-B entre tramo 1-2 m3 1.00 1.00 3.30 0.25 1.05 0.87 0.87
eje 2-2 entre tramo A-B m3 1.00 1.00 4.41 0.25 1.05 1.16 1.16
eje 3-3 entre tramo A-B m3 1.00 1.00 4.41 0.25 1.05 1.16 1.16
2.1.1.1.3 CIMIENTOS CORRIDOS 2.90
Cimiento corrido entre eje B-B y eje C-C entre tramo 1-2 m3 1.00 1.00 3.33 0.50 0.85 1.42 1.42
cimiento corrido entre eje C-C y eje D-D tramo 1-2 m3 1.00 1.00 2.95 0.50 0.85 1.25 1.25

HOJA DE METRADOS
HOJA DE METRADOS GENERALES
PROYECTO:

Descripcion N° de N° de Dimensiones
Item Unid Sub - Total Total
Partida Elementos Veces Largo (m) Ancho (m) Alto (m)
cimiento corrido entre eje C-C y eje D-D tramo 1-2 m3 1.00 1.00 0.90 0.30 0.85 0.23 0.23

2.1.1.2 VOLUMEN DE RELLENO 44.76


VIGAS DE CONEXIÓN 3.89
eje F-F entre tramo 1-2 m3 1.00 1.00 5.20 0.30 0.45 0.70 0.70
eje E-E entre tramo 1-2 m3 1.00 1.00 5.20 0.30 0.45 0.70 0.70
eje G-G entre tramo 1-2 m3 1.00 1.00 4.30 0.05 0.45 0.10 0.10
eje 2-2 entre tramo F-G m3 1.00 1.00 1.87 0.25 0.45 0.21 0.21
eje 2-2 entre tramo A-B m3 1.00 1.00 5.55 0.25 0.45 0.62 0.62
eje 2-2 entre tramo B-C m3 1.00 1.00 3.00 0.25 0.45 0.34 0.34
eje 3-3 entre tramo A-B m3 1.00 1.00 5.40 0.25 0.45 0.61 0.61
eje D-D entre tramo 1-2 m3 1.00 1.00 2.78 0.15 0.45 0.19 0.19
eje D-D entre tramo 1-2 m3 1.00 1.00 2.42 0.30 0.45 0.33 0.33
eje C-C entre tramo 1-2 m3 1.00 1.00 4.28 0.05 0.45 0.10 0.10
CIMIENTO CORRIDO 0.35
Cimiento corrido entre eje B-B y eje C-C entre tramo 1-2 m3 1.00 1.00 3.33 0.35 0.15 0.17 0.17
cimiento corrido entre eje C-C y eje D-D tramo 1-2 m3 1.00 1.00 2.95 0.35 0.15 0.15 0.15
cimiento corrido entre eje C-C y eje D-D tramo 1-2 m3 1.00 1.00 0.90 0.15 0.15 0.02 0.02
ZAPATAS 40.52
Z-2 esquinera eje G-G m3 1.00 1.00 3.08 0.95 2.93 2.93
Z-2 eje C-C tramo 1-2 m3 1.00 1.00 2.93 0.95 2.78 2.78
Z-1 eje B-B entre tramo 1-2 m3 1.00 1.00 2.61 0.95 2.48 2.48
Z-1 eje D-D , E-E , F-F entre tramo 1-2 m3 1.00 3.00 2.33 0.95 6.64 6.64
Z-3 entre eje G-G tramo 1-2 esquinera m3 1.00 1.00 4.19 0.95 3.98 3.98
Z-3 eje 2-2 entre tramo D-E , E-F m3 1.00 3.00 3.99 0.95 11.37 11.37
z-3 eje 2-2 entre tramo B-C m3 1.00 1.00 3.99 0.95 3.79 3.79
Z-4 m3 1.00 1.00 2.62 0.95 2.49 2.49
Z-5 m3 1.00 1.00 4.27 0.95 4.06 4.06
2.1.1.3 VOLUMEN DE ELIMINACION m3 69.36
VOLUMEN DE EXCAVACION m3 96.14
VOLUMEN DE RELLENO m3 44.76
VOLUMEN DE ELIMINACION m3 factor de esponjamiento 1.35 69.36

2.1.1.4 NIVELACION INTERIOR Y APISONADO m2 161.08


VIGAS DE CONEXIÓN 8.65
eje F-F entre tramo 1-2 m2 1.00 1.00 5.20 0.30 1.56 1.56
eje E-E entre tramo 1-2 m2 1.00 1.00 5.20 0.30 1.56 1.56
eje G-G entre tramo 1-2 m2 1.00 1.00 4.30 0.05 0.22 0.22
eje 2-2 entre tramo F-G m2 1.00 1.00 1.87 0.25 0.47 0.47

HOJA DE METRADOS
HOJA DE METRADOS GENERALES
PROYECTO:

Descripcion N° de N° de Dimensiones
Item Unid Sub - Total Total
Partida Elementos Veces Largo (m) Ancho (m) Alto (m)
eje 2-2 entre tramo A-B m2 1.00 1.00 5.55 0.25 1.39 1.39
eje 2-2 entre tramo B-C m2 1.00 1.00 3.00 0.25 0.75 0.75
eje 3-3 entre tramo A-B m2 1.00 1.00 5.40 0.25 1.35 1.35
eje D-D entre tramo 1-2 m2 1.00 1.00 2.78 0.15 0.42 0.42
eje D-D entre tramo 1-2 m2 1.00 1.00 2.42 0.30 0.73 0.73
eje C-C entre tramo 1-2 m2 1.00 1.00 4.28 0.05 0.21 0.21
CIMIENTO CORRIDO 2.33
Cimiento corrido entre eje B-B y eje C-C entre tramo 1-2 m2 1.00 1.00 3.33 0.35 1.17 1.17
cimiento corrido entre eje C-C y eje D-D tramo 1-2 m2 1.00 1.00 2.95 0.35 1.03 1.03
cimiento corrido entre eje C-C y eje D-D tramo 1-2 m2 1.00 1.00 0.90 0.15 0.14 0.14
ZAPATAS 42.65
Z-2 esquinera eje G-G m2 1.00 1.00 3.08 3.08 3.08
Z-2 eje C-C tramo 1-2 m2 1.00 1.00 2.93 2.93 2.93
Z-1 eje B-B entre tramo 1-2 m2 1.00 1.00 2.61 2.61 2.61
Z-1 eje D-D , E-E , F-F entre tramo 1-2 m2 1.00 3.00 2.33 6.99 6.99
Z-3 entre eje G-G tramo 1-2 esquinera m2 1.00 1.00 4.19 4.19 4.19
Z-3 eje 2-2 entre tramo D-E , E-F m2 1.00 3.00 3.99 11.97 11.97
z-3 eje 2-2 entre tramo B-C m2 1.00 1.00 3.99 3.99 3.99
Z-4 m2 1.00 1.00 2.62 2.62 2.62
Z-5 m2 1.00 1.00 4.27 4.27 4.27
ESPACIOS SIN RELLENO 107.45
EJE F-F Y EJE G-G ENTRE TRAMO 1-2 m2 1.00 1.00 22.05 22.05 22.05
EJE E-E Y EJE F-F ENTRE TRAMO 1-2 m2 1.00 1.00 22.79 22.79 22.79
EJE D-D Y EJE E-E ENTRE TRAMO 1-2 m2 1.00 1.00 22.80 22.80 22.80
EJE C-C Y EJE D-D ENTRE TRAMO 1-2 m2 1.00 1.00 20.26 20.26 20.26
EJE B-B Y EJE C-C ENTRE TRAMO 1-2 m2 1.00 1.00 13.16 13.16 13.16
EJE A-A Y EJE B-B ENTRE TRAMO 2-3 m2 1.00 1.00 6.39 6.39 6.39

2.1.1.2 OBRAS DE CONCRETO SIMPLE


2.1.1.2.1 CIMIENTO CORRIDO m3 2.39
Cimiento corrido entre eje B-B y eje C-C entre tramo 1-2 m3 1.00 1.00 3.33 0.50 0.70 1.17 1.17
cimiento corrido entre eje C-C y eje D-D tramo 1-2 m3 1.00 1.00 2.95 0.50 0.70 1.03 1.03
cimiento corrido entre eje C-C y eje D-D tramo 1-2 m3 1.00 1.00 0.90 0.30 0.70 0.19 0.19

2.1.1.2.2 SOLADO m2 68.24


ZAPATAS solado e= 10 cm m2 53.96
Z-1 m2 1.00 4.00 1.80 1.80 12.96 12.96
z-2 m2 1.00 2.00 2.20 1.80 7.92 7.92

HOJA DE METRADOS
HOJA DE METRADOS GENERALES
PROYECTO:

Descripcion N° de N° de Dimensiones
Item Unid Sub - Total Total
Partida Elementos Veces Largo (m) Ancho (m) Alto (m)
Z-3 m2 1.00 5.00 2.20 2.20 24.20 24.20
z-4 m2 1.00 1.00 2.75 1.20 3.30 3.30
Z-5 m2 1.00 1.00 3.10 1.80 5.58 5.58
VIGAS DE CONEXIÓN m2 14.28
eje G-G entre tramo 1-2 m2 1.00 1.00 2.72 0.30 0.82 0.82
eje 1-1 entre tramo F-G m2 1.00 1.00 3.15 0.25 0.79 0.79
eje 2-2 entre tramo F-G m2 1.00 1.00 2.75 0.25 0.69 0.69
eje F-F entre tramo 1-2 m2 1.00 1.00 3.12 0.30 0.94 0.94
eje 2-2 entre tramo E-F m2 1.00 1.00 2.90 0.25 0.73 0.73
eje 1-1 entre tramo E-F m2 1.00 1.00 3.30 0.25 0.83 0.83
eje E-E entre tramo 1-2 m2 1.00 1.00 3.12 0.30 0.94 0.94
eje 2-2 entre tramo D-E m2 1.00 1.00 2.90 0.25 0.73 0.73
eje 1-1- entre tramo D-E m2 1.00 1.00 3.30 0.25 0.83 0.83
eje D-D entre tramo 1-2 m2 1.00 1.00 3.12 0.30 0.94 0.94
eje 2-2 entre tramo C-D m2 1.00 1.00 2.72 0.25 0.68 0.68
eje 1-1 entre tramo C-D m2 1.00 1.00 3.15 0.25 0.79 0.79
eje C-C entre tramo 1-2 m2 1.00 1.00 2.72 0.30 0.82 0.82
eje 2-2 entre tramo B-C m2 1.00 1.00 1.45 0.25 0.36 0.36
eje 1-1 entre tramo B-C m2 1.00 1.00 1.63 0.25 0.41 0.41
eje B-B entre tramo 1-2 m2 1.00 1.00 3.30 0.25 0.83 0.83
eje 2-2 entre tramo A-B m2 1.00 1.00 4.41 0.25 1.10 1.10
eje 3-3 entre tramo A-B m2 1.00 1.00 4.41 0.25 1.10 1.10

2.1.1.2.3 SOBRECIMIENTO
2.1.1.2.3.1 CONCRETO PARA SOBRECIMIENTO m3 10.78
EJE G-G ENTRE TRAMO 1-2 m3 1.00 1.00 4.30 0.25 0.85 0.91 0.91
EJE 1-1 ENTRE TRAMO F-G m3 1.00 1.00 3.98 0.25 0.85 0.85 0.85
EJE 2-2 ENTRE TRAMO F-G m3 1.00 1.00 2.13 0.25 0.85 0.45 0.45
EJE 1-1 ENTRE TRAMO E-F m3 1.00 1.00 4.40 0.25 0.85 0.94 0.94
EJE 2-2 ENTRE TRAMO E-F m3 1.00 1.00 4.40 0.25 0.85 0.94 0.94
EJE 2-2 ENTRE TRAMO D-E m3 1.00 1.00 2.88 0.25 0.85 0.61 0.61
EJE 1-1 ENTRE TRAMO D-E m3 1.00 1.00 4.40 0.25 0.85 0.94 0.94
EJE D-D ENTRE TRAMO 1-2 m3 1.00 1.00 2.78 0.15 0.85 0.35 0.35
EJE 1-1 ENTRE TRAMO C-D m3 1.00 1.00 4.00 0.25 0.85 0.85 0.85
EJE 2-2 ENTRE TRAMO C-D m3 1.00 1.00 4.00 0.25 0.85 0.85 0.85
EJE C-C ENTRE TRAMO 1-2 m3 1.00 1.00 4.30 0.25 0.85 0.91 0.91
EJE 1-1 ENTRE TRAMO B-C m3 1.00 1.00 3.00 0.25 0.85 0.64 0.64
EJE B-B ENTRE TRAMO 1-2 m3 1.00 1.00 4.90 0.25 0.85 1.04 1.04

HOJA DE METRADOS
HOJA DE METRADOS GENERALES
PROYECTO:

Descripcion N° de N° de Dimensiones
Item Unid Sub - Total Total
Partida Elementos Veces Largo (m) Ancho (m) Alto (m)
ENTRE EJE C-C Y EJE D-D , TRAMO 1-2 ( sobrecimiento sobre cc) m3 1.00 1.00 3.75 0.15 0.55 0.31 0.31
ENTRE EJE B-B Y EJE C-C , TRAMO 1-2 ( sobrecimiento sobre cc) m3 1.00 1.00 2.40 0.15 0.55 0.20 0.20

2.1.1.2.3.2 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO m2 90.86


EJE G-G ENTRE TRAMO 1-2 m2 1.00 2.00 4.30 0.85 7.31 7.31
EJE 1-1 ENTRE TRAMO F-G m2 1.00 2.00 3.98 0.85 6.77 6.77
EJE 2-2 ENTRE TRAMO F-G m2 1.00 2.00 2.13 0.85 3.62 3.62
EJE 1-1 ENTRE TRAMO E-F m2 1.00 2.00 4.40 0.85 7.48 7.48
EJE 2-2 ENTRE TRAMO E-F m2 1.00 2.00 4.40 0.85 7.48 7.48
EJE 2-2 ENTRE TRAMO D-E m2 1.00 2.00 2.88 0.85 4.90 4.90
EJE 1-1 ENTRE TRAMO D-E m2 1.00 2.00 4.40 0.85 7.48 7.48
EJE D-D ENTRE TRAMO 1-2 m2 1.00 2.00 2.78 0.85 4.73 4.73
EJE 1-1 ENTRE TRAMO C-D m2 1.00 2.00 4.00 0.85 6.80 6.80
EJE 2-2 ENTRE TRAMO C-D m2 1.00 2.00 4.00 0.85 6.80 6.80
EJE C-C ENTRE TRAMO 1-2 m2 1.00 2.00 4.30 0.85 7.31 7.31
EJE 1-1 ENTRE TRAMO B-C m2 1.00 2.00 3.00 0.85 5.10 5.10
EJE B-B ENTRE TRAMO 1-2 m2 1.00 2.00 4.90 0.85 8.33 8.33
ENTRE EJE C-C Y EJE D-D , TRAMO 1-2 ( sobrecimiento sobre cc) m2 1.00 2.00 3.75 0.55 4.13 4.13
ENTRE EJE B-B Y EJE C-C , TRAMO 1-2 ( sobrecimiento sobre cc) m2 1.00 2.00 2.40 0.55 2.64 2.64

2.1.1.2.4 FALSO PISO e= 0.10 m


falso piso interior e= 0.10 m ( incluye todo) m2 1.00 1.00 129.65 129.65 129.65

2.20 OBRAS DE CONCRETO ARMADO


2.2.1 ZAPATAS
2.2.1.1 CONCRETO F'C = 210 KG/CM2 m3 21.58
Z-1 m3 1.00 4.00 1.80 1.80 0.40 5.18 5.18
z-2 m3 1.00 2.00 2.20 1.80 0.40 3.17 3.17
Z-3 m3 1.00 5.00 2.20 2.20 0.40 9.68 9.68
z-4 m3 1.00 1.00 2.75 1.20 0.40 1.32 1.32
Z-5 m3 1.00 1.00 3.10 1.80 0.40 2.23 2.23

2.2.1.2 ENCOFRADO Y DESENCOFRADO DE ZAPATAS (Perimetro) m2 42.60


Z-1 m2 1.00 4.00 7.20 0.40 11.52 11.52
z-2 m2 1.00 2.00 8.00 0.40 6.40 6.40
Z-3 m2 1.00 5.00 8.80 0.40 17.60 17.60
z-4 m2 1.00 1.00 7.90 0.40 3.16 3.16
Z-5 m2 1.00 1.00 9.80 0.40 3.92 3.92

HOJA DE METRADOS
HOJA DE METRADOS GENERALES
PROYECTO:

Descripcion N° de N° de Dimensiones
Item Unid Sub - Total Total
Partida Elementos Veces Largo (m) Ancho (m) Alto (m)

2.2.1.3 ACERO FY = 4200 KG/ CM2 EN ZAPATAS KG VER HOJA DE METRADO DE ACERO 802.36

2.2.2 VIGAS DE CONEXIÓN


2.2.2.1 CONCRETO F'C= 210 KG/CM2 PARA VIGAS m3 10.56
eje G-G entre tramo 1-2 m3 1.00 1.00 4.31 0.30 0.50 0.65 0.65
eje 1-1 entre tramo F-G m3 1 1.00 4.00 0.25 0.50 0.50 0.50
eje 2-2 entre tramo F-G m3 1 1.00 4.00 0.25 0.50 0.50 0.50
eje F-F entre tramo 1-2 m3 1 1.00 5.20 0.30 0.50 0.78 0.78
eje 2-2 entre tramo E-F m3 1 1.00 4.40 0.25 0.50 0.55 0.55
eje 1-1 entre tramo E-F m3 1 1.00 4.40 0.25 0.50 0.55 0.55
eje E-E entre tramo 1-2 m3 1 1.00 5.20 0.30 0.50 0.78 0.78
eje 2-2 entre tramo D-E m3 1 1.00 4.40 0.25 0.50 0.55 0.55
eje 1-1- entre tramo D-E m3 1 1.00 4.40 0.25 0.50 0.55 0.55
eje D-D entre tramo 1-2 m3 1 1.00 5.20 0.30 0.50 0.78 0.78
eje 2-2 entre tramo C-D m3 1 1.00 4.00 0.25 0.50 0.50 0.5
eje 1-1 entre tramo C-D m3 1 1.00 4.00 0.25 0.50 0.50 0.50
eje C-C entre tramo 1-2 m3 1 1.00 4.30 0.30 0.50 0.65 0.65
eje 2-2 entre tramo B-C m3 1 1.00 3.00 0.25 0.50 0.38 0.38
eje 1-1 entre tramo B-C m3 1 1.00 3.00 0.25 0.50 0.38 0.38
eje B-B entre tramo 1-2 m3 1 1.00 4.90 0.25 0.50 0.61 0.61
eje 2-2 entre tramo A-B m3 1 1.00 5.55 0.25 0.50 0.69 0.69
eje 3-3 entre tramo A-B m3 1 1.00 5.40 0.25 0.50 0.68 0.68

2.2.2.2 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONEXIÓN m2 79.66


eje G-G entre tramo 1-2 m2 1.00 2.00 4.31 0.50 4.31 4.31
eje 1-1 entre tramo F-G m2 1.00 2.00 4.00 0.50 4.00 4.00
eje 2-2 entre tramo F-G m2 1.00 2.00 4.00 0.50 4.00 4.00
eje F-F entre tramo 1-2 m2 1.00 2.00 5.20 0.50 5.20 5.20
eje 2-2 entre tramo E-F m2 1.00 2.00 4.40 0.50 4.40 4.40
eje 1-1 entre tramo E-F m2 1.00 2.00 4.40 0.50 4.40 4.40
eje E-E entre tramo 1-2 m2 1.00 2.00 5.20 0.50 5.20 5.20
eje 2-2 entre tramo D-E m2 1.00 2.00 4.40 0.50 4.40 4.40
eje 1-1- entre tramo D-E m2 1.00 2.00 4.40 0.50 4.40 4.40
eje D-D entre tramo 1-2 m2 1.00 2.00 5.20 0.50 5.20 5.20
eje 2-2 entre tramo C-D m2 1.00 2.00 4.00 0.50 4.00 4.00
eje 1-1 entre tramo C-D m2 1.00 2.00 4.00 0.50 4.00 4.00
eje C-C entre tramo 1-2 m2 1.00 2.00 4.30 0.50 4.30 4.30

HOJA DE METRADOS
HOJA DE METRADOS GENERALES
PROYECTO:

Descripcion N° de N° de Dimensiones
Item Unid Sub - Total Total
Partida Elementos Veces Largo (m) Ancho (m) Alto (m)
eje 2-2 entre tramo B-C m2 1.00 2.00 3.00 0.50 3.00 3.00
eje 1-1 entre tramo B-C m2 1.00 2.00 3.00 0.50 3.00 3.00
eje B-B entre tramo 1-2 m2 1.00 2.00 4.90 0.50 4.90 4.90
eje 2-2 entre tramo A-B m2 1.00 2.00 5.55 0.50 5.55 5.55
eje 3-3 entre tramo A-B m2 1.00 2.00 5.40 0.50 5.40 5.40

2.2.2.3 ACERO FY= 4200 KG/CM2 EN VIGAS DE CONEXIÓN kg VER HOJA DE METRADOS DE ACERO

HOJA DE METRADOS
PROYECTO: HOJA DE METRADOS DE ACERO

Longitud por ø por ML


Desc. DISEÑO DEL FIERRO ø Nº de element
iguales
Longitud (m)
Nº de pieza por
elemento
1/4" 3/8" 1/2" 5/8" 3/4"

ZAPATA
Z-1
SENTIDO X 1/2 4.00 1.70 12.00 81.60
SENTIDO Y 1/2 4.00 1.70 12.00 81.60

Z-2
SENTIDO X 1/2 2.00 1.70 15.00 51.00
SENTIDO Y 1/2 2.00 2.10 12.00 50.40

Z-3
SENTIDO X 1/2 5.00 2.10 15.00 157.50
SENTIDO Y 1/2 5.00 2.10 15.00 157.50

Z-4 (doble malla)


SENTIDO X 1/2 2.00 1.10 19.00 41.80
SENTIDO Y 1/2 2.00 2.65 8.00 42.40

Z-5 ( doble malla)


SENTIDO X 1/2 2.00 1.70 21.00 71.40
SENTIDO Y 1/2 2.00 3.00 12.00 72.00

PESO UNIT (KG) POR ML DE ø 0.27 0.57 0.99 1.57 2.24

LONG TOTAL (ML) POR ø 0.00 0.00 807.20 0.00 0.00


RESUMEN GENERAL Nº TOTAL DE VARILLAS POR ø 0.00 0.00 90.00 0.00 0.00
PESO TOTAL (KG) POR ø 0.00 0.00 802.36 0.00 0.00
PESO TOTAL (KG) 802.36

Longitud por ø por ML


Desc. DISEÑO DEL FIERRO ø Nº de element
iguales
Longitud (m)
Nº de pieza por
elemento
1/4" 3/8" 1/2" 5/8" 3/4"

VIGA DE CONEXIÓN
EJE 1-1
ACERO LONGITUDINAL 5/8 1.00 25.25 6.00 151.50

METRADO DE ACERO
PROYECTO: HOJA DE METRADOS DE ACERO
ESTRIBO EJE 1-1 TRAMO F-G 3/8 1.00 1.30 27.00 35.10
ESTRIBO EJE 1-1 TRAMO E-F 3/8 1.00 1.30 29.00 37.70

METRADO DE ACERO
PROYECTO: HOJA DE METRADOS DE ACERO

PESO UNIT (KG) POR ML DE ø 0.27 0.56 1.02 1.55 2.24

LONG TOTAL (ML) POR ø 0.00 72.80 0.00 151.50 0.00


RESUMEN GENERAL Nº TOTAL DE VARILLAS POR ø 0.00 8.09 0.00 16.83 0.00
PESO TOTAL (KG) POR ø 0.00 40.77 0.00 235.13 0.00
PESO TOTAL (KG) 275.90

Longitud por ø por ML


Desc. DISEÑO DEL FIERRO ø Nº de element
iguales
Longitud (m)
Nº de pieza por
elemento
1/4" 3/8" 1/2" 5/8" 3/4"

PESO UNIT (KG) POR ML DE ø 0.27 0.57 1.02 1.57 2.24

LONG TOTAL (ML) POR ø 0.00 0.00 0.00 0.00 0.00


RESUMEN GENERAL Nº TOTAL DE VARILLAS POR ø 0.00 0.00 0.00 0.00 0.00

METRADO DE ACERO
PROYECTO: HOJA DE METRADOS DE ACERO
RESUMEN GENERAL

PESO TOTAL (KG) POR ø 0.00 0.00 0.00 0.00 0.00


PESO TOTAL (KG) 0.00

METRADO DE ACERO
1"

3.97

0.00

0.00

0.00

1"

METRADO DE ACERO
METRADO DE ACERO
3.97

0.00

0.00

0.00

1"

3.97

0.00

0.00

METRADO DE ACERO
0.00

METRADO DE ACERO