Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Diseño de Cimentaciones Bloque A-B
Diseño de Cimentaciones Bloque A-B
t1=1.20m
S = 2.10 m
t2=1.20m
T = 2.10 m
DATOS
Pd = 31.43 Tn
Pl = 4.98 Tn
hf = 2.00 m
γs = 1.82 Tn/m3
f'c = 210 Kg/cm2
f'y = 4200 Kg/cm2
qa = 1.23 Kg/cm2
γc = 2.40 Tn/m3
DIMENSIONAMIENTO
Asumimos
h= 0.50 m d= 0.40 m
Hs = 1.50 m
qe = qa - γs x Hs - γc x h qe = 8.37 Tn/m2
T S Total
A = (Pd+Pl)/qe = 4.35 m2 Area = 2.09 m x 2.09 m 4.35 m2
2.09 m Asumimos Area = 2.10 m x 2.10 m 4.41 m2
Lv1 = 0.45
Reacciòn Neta del terreno Lv2 = 0.45 ok
Wu = Pu/A
Pu = 1.4xPd + 1.7xPl = 52.47 Tn Wu = 1.19 Kg/cm2
241.6 Wu = 11.9 Tn/m2
(1) = (2)
534.17 d2 + 655.28 d -35.34 = 0
d = 0.052 m
d= -1.278 m Conforme
Usamos h= 0.50 m
Recubrimiento 7.50 cm
Acero ɸ 5/8 d= 40.91 cm
Verificación por Cortante
As = Mu
ɸ*f'y*(d-a/2)
As = 1.64 cm2
a= 0.18
Espaciamiento (s)
s= 0.18 m
En la dirección Transversal
Espaciamiento (s)
s= 0.18 m
t1=1.20m
8 (unidades)
S = 2.10 m
@ 0.18 m
t2=1.20m
T = 2.10 m
8 (unidades)
@ 0.18 m
Ld = 40.17 m Conforme
Longitud de Desarrollo Lde = 32.14 m
Ldisponible = 37.50 m Conforme
Pn = Pu/ɸ = 74.95 Tn
Pnb = 0.85*f'c*Ao
t1=1.20m
S = 2.10 m
Xo t2=1.20m
T = 2.10 m
Ao = √(A2/A1)*Aco1 ≤ 2Aco1
Xo = 2.10 m
A2 = 4.41 m2
√(A2/A1) = 1.75 m
1.75 Pn<Pnb
Pnb = 5140.80 Tn Conforme
DISEÑO DE ZAPATA 2 - BLOQUE A - COLUMNAS T (65-69-73)
t1=1.20m
S = 2.65 m
t2=0.60m
T = 3.25 m
DATOS
Pd = 40.43 Tn
Pl = 9.18 Tn
hf = 2.00 m
γs = 1.82 Tn/m3
f'c = 210 Kg/cm2
f'y = 4200 Kg/cm2
qa = 1.23 Kg/cm2
γc = 2.40 Tn/m3
DIMENSIONAMIENTO
Asumimos
h= 0.50 m d= 0.40 m
Hs = 1.50 m
qe = qa - γs x Hs - γc x h qe = 5.87 Tn/m2
T S Total
A = (Pd+Pl)/qe = 8.45 m2 Area = 3.21 m x 2.61 m 8.36 m2
2.91 m Asumimos Area = 3.25 m x 2.65 m 8.61 m2
Lv1 = 1.03
Reacciòn Neta del terreno Lv2 = 1.03 ok
Wu = Pu/A
Pu = 1.4xPd + 1.7xPl = 72.21 Tn Wu = 0.84 Kg/cm2
241.6 Wu = 8.4 Tn/m2
(1) = (2)
530.65 d2 + 485.13 d -66.17 = 0
d = 0.121 m
d= -1.035 m Conforme
Usamos h= 0.50 m
Recubrimiento 7.50 cm
Acero ɸ 5/8 d= 40.91 cm
Verificación por Cortante
As = Mu
ɸ*f'y*(d-a/2)
As = 7.59 cm2
a= 0.67
Espaciamiento (s)
s= 0.18 m
En la dirección Transversal
Espaciamiento (s)
s= 0.16 m
t1=1.20m
13 (unidades)
S = 2.65 m
@ 0.16 m
t2=0.60m
T = 3.25 m
10 (unidades)
@ 0.18 m
Ld = 40.17 m Conforme
Longitud de Desarrollo Lde = 32.14 m
Ldisponible = 95.00 m Conforme
Pn = Pu/ɸ = 103.15 Tn
Pnb = 0.85*f'c*Ao
t1=1.20m
S = 2.65 m
Xo t2=0.60m
T = 3.25 m
Ao = √(A2/A1)*Aco1 ≤ 2Aco1
Xo = 1.63 m
A2 = 5.28 m2
√(A2/A1) = 2.71 m
Ao=2*Ac Pn<Pnb
Pnb = 2570.40 Tn Conforme
DISEÑO DE ZAPATA 3 - BLOQUE A - COLUMNAS T (66-70-74)
t1=1.20m
S = 2.90 m
t2=0.60m
T = 3.50 m
DATOS
Pd = 46.17 Tn
Pl = 14.12 Tn
hf = 2.00 m
γs = 1.82 Tn/m3
f'c = 210 Kg/cm2
f'y = 4200 Kg/cm2
qa = 1.23 Kg/cm2
γc = 2.40 Tn/m3
DIMENSIONAMIENTO
Asumimos
h= 0.50 m d= 0.40 m
Hs = 1.50 m
qe = qa - γs x Hs - γc x h qe = 5.87 Tn/m2
T S Total
A = (Pd+Pl)/qe = 10.27 m2 Area = 3.50 m x 2.90 m 10.18 m2
3.20 m Asumimos Area = 3.50 m x 2.90 m 10.15 m2
Lv1 = 1.15
Reacciòn Neta del terreno Lv2 = 1.15 ok
Wu = Pu/A
Pu = 1.4xPd + 1.7xPl = 88.64 Tn Wu = 0.87 Kg/cm2
241.6 Wu = 8.7 Tn/m2
(1) = (2)
531.00 d2 + 485.76 d -82.35 = 0
d = 0.146 m
d= -1.061 m Conforme
Usamos h= 0.50 m
Recubrimiento 7.50 cm
Acero ɸ 5/8 d= 40.91 cm
Verificación por Cortante
As = Mu
ɸ*f'y*(d-a/2)
As = 10.92 cm2
a= 0.89
Espaciamiento (s)
s= 0.17 m
En la dirección Transversal
Espaciamiento (s)
s= 0.16 m
t1=1.20m
14 (unidades)
S = 2.90 m
@ 0.16 m
t2=0.60m
T = 3.50 m
11 (unidades)
@ 0.17 m
Ld = 40.17 m Conforme
Longitud de Desarrollo Lde = 32.14 m
Ldisponible = 107.50 m Conforme
Pn = Pu/ɸ = 126.63 Tn
Pnb = 0.85*f'c*Ao
t1=1.20m
S = 2.90 m
Xo t2=0.60m
T = 3.50 m
Ao = √(A2/A1)*Aco1 ≤ 2Aco1
Xo = 1.75 m
A2 = 6.13 m2
√(A2/A1) = 2.92 m
Ao=2*Ac Pn<Pnb
Pnb = 2570.40 Tn Conforme
DISEÑO DE ZAPATA 4 RECTANGULAR - BLOQUE A (3-4-5-7-8-9)
t1=0.30m
S = 2.90 m
t2=0.70m
T = 2.50 m
DATOS
Pd = 33.42 Tn
Pl = 9.29 Tn
hf = 2.00 m
γs = 1.82 Tn/m3
f'c = 210 Kg/cm2
f'y = 4200 Kg/cm2
qa = 1.23 Kg/cm2
γc = 2.40 Tn/m3
DIMENSIONAMIENTO
Asumimos
h= 0.50 m d= 0.40 m
Hs = 1.50 m
qe = qa - γs x Hs - γc x h qe = 5.87 Tn/m2
T S Total
A = (Pd+Pl)/qe = 7.28 m2 Area = 2.50 m x 2.90 m 7.24 m2
2.70 m Asumimos Area = 2.50 m x 2.90 m 7.25 m2
Lv1 = 1.10
Reacciòn Neta del terreno Lv2 = 1.10 ok
Wu = Pu/A
Pu = 1.4xPd + 1.7xPl = 62.58 Tn Wu = 0.86 Kg/cm2
241.6 Wu = 8.6 Tn/m2
(1) = (2)
530.90 d2 + 269.77 d -60.77 = 0
d = 0.169 m
d= -0.677 m Conforme
Usamos h= 0.50 m
Recubrimiento 7.50 cm
Acero ɸ 5/8 d= 40.91 cm
Verificación por Cortante
As = Mu
ɸ*f'y*(d-a/2)
As = 9.87 cm2
a= 0.80
Espaciamiento (s)
s= 0.17 m
En la dirección Transversal
Espaciamiento (s)
s= 0.16 m
t1=0.30m
10 (unidades)
S = 2.90 m
@ 0.16 m
t2=0.70m
T = 2.50 m
11 (unidades)
@ 0.17 m
Ld = 40.17 m Conforme
Longitud de Desarrollo Lde = 32.14 m
Ldisponible = 102.50 m Conforme
Pn = Pu/ɸ = 89.40 Tn
Pnb = 0.85*f'c*Ao
t1=0.30m
S = 2.90 m
Xo t2=0.70m
T = 2.50 m
Ao = √(A2/A1)*Aco1 ≤ 2Aco1
Xo = 5.83 m
A2 = 14.58 m2
√(A2/A1) = 8.33 m
Ao=2*Ac Pn<Pnb
Pnb = 749.70 Tn Conforme
DISEÑO DE ZAPATA 4 RECTANGULAR - BLOQUE A (34)
t1=0.30m
S = 2.40 m
t2=0.70m
T = 2.00 m
DATOS
Pd = 23.45 Tn
Pl = 4.57 Tn
hf = 2.00 m
γs = 1.82 Tn/m3
f'c = 210 Kg/cm2
f'y = 4200 Kg/cm2
qa = 1.23 Kg/cm2
γc = 2.40 Tn/m3
DIMENSIONAMIENTO
Asumimos
h= 0.50 m d= 0.40 m
Hs = 1.50 m
qe = qa - γs x Hs - γc x h qe = 5.87 Tn/m2
T S Total
A = (Pd+Pl)/qe = 4.77 m2 Area = 1.98 m x 2.38 m 4.73 m2
2.18 m Asumimos Area = 2.00 m x 2.40 m 4.80 m2
Lv1 = 0.85
Reacciòn Neta del terreno Lv2 = 0.85 ok
Wu = Pu/A
Pu = 1.4xPd + 1.7xPl = 40.60 Tn Wu = 0.85 Kg/cm2
241.6 Wu = 8.5 Tn/m2
(1) = (2)
530.73 d2 + 269.59 d -38.82 = 0
d = 0.117 m
d= -0.625 m Conforme
Usamos h= 0.50 m
Recubrimiento 7.50 cm
Acero ɸ 5/8 d= 40.91 cm
Verificación por Cortante
As = Mu
ɸ*f'y*(d-a/2)
As = 4.76 cm2
a= 0.47
Espaciamiento (s)
s= 0.18 m
En la dirección Transversal
Espaciamiento (s)
s= 0.16 m
t1=0.30m
8 (unidades)
S = 2.40 m
@ 0.16 m
t2=0.70m
T = 2.00 m
9 (unidades)
@ 0.18 m
Ld = 40.17 m Conforme
Longitud de Desarrollo Lde = 32.14 m
Ldisponible = 77.50 m Conforme
Pn = Pu/ɸ = 58.00 Tn
Pnb = 0.85*f'c*Ao
t1=0.30m
S = 2.40 m
Xo t2=0.70m
T = 2.00 m
Ao = √(A2/A1)*Aco1 ≤ 2Aco1
Xo = 4.67 m
A2 = 9.33 m2
√(A2/A1) = 6.67 m
Ao=2*Ac Pn<Pnb
Pnb = 749.70 Tn Conforme
DISEÑO DE ZAPATA 5 RECTANGULAR - BLOQUE A (1)
t1=0.30m
S = 1.50 m
t2=0.30m
T = 1.50 m
DATOS
Pd = 10.24 Tn
Pl = 1.99 Tn
hf = 2.00 m
γs = 1.82 Tn/m3
f'c = 210 Kg/cm2
f'y = 4200 Kg/cm2
qa = 1.23 Kg/cm2
γc = 2.40 Tn/m3
DIMENSIONAMIENTO
Asumimos
h= 0.50 m d= 0.40 m
Hs = 1.50 m
qe = qa - γs x Hs - γc x h qe = 5.87 Tn/m2
T S Total
A = (Pd+Pl)/qe = 2.08 m2 Area = 1.44 m x 1.44 m 2.08 m2
1.44 m Asumimos Area = 1.50 m x 1.50 m 2.25 m2
Lv1 = 0.60
Reacciòn Neta del terreno Lv2 = 0.60 ok
Wu = Pu/A
Pu = 1.4xPd + 1.7xPl = 17.72 Tn Wu = 0.79 Kg/cm2
241.6 Wu = 7.9 Tn/m2
(1) = (2)
530.14 d2 + 161.41 d -17.01 = 0
d = 0.083 m
d= -0.387 m Conforme
Usamos h= 0.50 m
Recubrimiento 7.50 cm
Acero ɸ 5/8 d= 40.91 cm
Verificación por Cortante
As = Mu
ɸ*f'y*(d-a/2)
As = 1.38 cm2
a= 0.22
Espaciamiento (s)
s= 0.17 m
En la dirección Transversal
Espaciamiento (s)
s= 0.17 m
t1=0.30m
6 (unidades)
S = 1.50 m
@ 0.17 m
t2=0.30m
T = 1.50 m
6 (unidades)
@ 0.17 m
Ld = 40.17 m Conforme
Longitud de Desarrollo Lde = 32.14 m
Ldisponible = 52.50 m Conforme
Pn = Pu/ɸ = 25.31 Tn
Pnb = 0.85*f'c*Ao
t1=0.30m
S = 1.50 m
Xo t2=0.30m
T = 1.50 m
Ao = √(A2/A1)*Aco1 ≤ 2Aco1
Xo = 1.50 m
A2 = 2.25 m2
√(A2/A1) = 5.00 m
Ao=2*Ac Pn<Pnb
Pnb = 321.30 Tn Conforme
DISEÑO DE ZAPATA 5 RECTANGULAR - BLOQUE A (67-6-71-10-75)
t1=0.30m
S = 1.90 m
t2=0.30m
T = 1.90 m
DATOS
Pd = 15.92 Tn
Pl = 4.13 Tn
hf = 2.00 m
γs = 1.82 Tn/m3
f'c = 210 Kg/cm2
f'y = 4200 Kg/cm2
qa = 1.23 Kg/cm2
γc = 2.40 Tn/m3
DIMENSIONAMIENTO
Asumimos
h= 0.50 m d= 0.40 m
Hs = 1.50 m
qe = qa - γs x Hs - γc x h qe = 5.87 Tn/m2
T S Total
A = (Pd+Pl)/qe = 3.42 m2 Area = 1.85 m x 1.85 m 3.42 m2
1.85 m Asumimos Area = 1.90 m x 1.90 m 3.61 m2
Lv1 = 0.80
Reacciòn Neta del terreno Lv2 = 0.80 ok
Wu = Pu/A
Pu = 1.4xPd + 1.7xPl = 29.31 Tn Wu = 0.81 Kg/cm2
241.6 Wu = 8.1 Tn/m2
(1) = (2)
530.39 d2 + 161.55 d -28.58 = 0
d = 0.125 m
d= -0.430 m Conforme
Usamos h= 0.50 m
Recubrimiento 7.50 cm
Acero ɸ 5/8 d= 40.91 cm
Verificación por Cortante
As = Mu
ɸ*f'y*(d-a/2)
As = 3.20 cm2
a= 0.40
Espaciamiento (s)
s= 0.15 m
En la dirección Transversal
Espaciamiento (s)
s= 0.15 m
t1=0.30m
8 (unidades)
S = 1.90 m
@ 0.15 m
t2=0.30m
T = 1.90 m
8 (unidades)
@ 0.15 m
Ld = 40.17 m Conforme
Longitud de Desarrollo Lde = 32.14 m
Ldisponible = 72.50 m Conforme
Pn = Pu/ɸ = 41.87 Tn
Pnb = 0.85*f'c*Ao
t1=0.30m
S = 1.90 m
Xo t2=0.30m
T = 1.90 m
Ao = √(A2/A1)*Aco1 ≤ 2Aco1
Xo = 1.90 m
A2 = 3.61 m2
√(A2/A1) = 6.33 m
Ao=2*Ac Pn<Pnb
Pnb = 321.30 Tn Conforme
DISEÑO DE VIGAS DE CONEXIÓN - BLOQUE A - ZAPATA 8 - VIGA DE CONEXIÓN EJE 4
62 73
P1 P2
hf
hz
Re 4.90 m.
L1
σ= 1.23 Kg/cm2
hf= 2.00 m
jm= 1.82 Tn/m3
f'c= 210 Kg/cm2
f'y= 4200 Kg/cm2
s/c = 0.20 Tn/m2
Pd= 28.58 Tn Pd= 40.43 Tn
Pl= 2.57 Tn Pl= 9.18 Tn
P1= 31.15 Tn P2= 49.61 Tn
0.70 m
0.21 m = 0.35 m
Entonces usamos:
b h
V-C 0.35 x 0.70 m2
Estimamos
σn = 8.46 Tn/m2
Az = 4.42 m2 T = 2*S
S= 1.49 m
Preliminar
T= 2.97 m
T T=2S
S
Dimensiones Finales de zapata S = 1.50 m T = 3.00 m
Pu = 1.4Pd + 1.7Pl
Pu= 44.381 Tn
Wv = 0.59 Tn/m
ΣM2=0
Ru= 52.23 Tn Wnu = Ru/S
Wnu= 34.82 Tn/m
Vx=(Wnu-Wv)Xo-Pu=0
Xo= 1.30 < S OK¡
Mumax = (Wnu-Wv)Xo2/2-Pu(Xo-T1/2)
0.00521
OK
0.00333
As = 7.22 cm2
Vc = 0.53*√f'c*10*b*d = 16.80 Tn OK
Debe ser mayor
Estribos de Montaje
S = 36*Ø = 68.58 cm
Usamos Ø 3/8 @ 50.00 cm
1.20 m
4. Diseño de la Zapata Exterior l' = 0.900
17.41 Tn/m
Wnu
T = 3.00 m
ρ = 0.004
w = 0.08
Mu = 7.05 Tn-m
ø = 0.9
(S) b = 150 cm
d = 18.06 cm
Si h = 50.00 cm (Peralte de Zapata)
d = 42.50 cm
ø = 0.85
As = 4.88 cm2
a= 0.77 cm
As = 4.43 cm2
a= 0.69 cm
As = 4.88 cm2
Refuerzo Transversal
As = 16.20 cm2
Cant. Diametro Area Total (cm2)
8 5/8 1.98 15.84
Usamos 8 Ø 5/8 @ 0.38
Diseño Final
S = 1.50 m
Viga de Conexión
h = 50.00 cm 4 Ø 3/4
6 Ø 5/8
T = 3.00 m
0.70 cm
3 Ø 3/4
b = 0.35 cm
8 Ø 5/8
DISEÑO DE VIGAS DE CONEXIÓN - BLOQUE A - VIGA DE CONEXIÓN EJE 2
74 61
P1 P2
hf
hz
Re 4.90 m.
L1
σ= 1.23 Kg/cm2
hf= 2.00 m
jm= 1.82 Tn/m3
f'c= 210 Kg/cm2
f'y= 4200 Kg/cm2
s/c = 0.20 Tn/m2
Pd= 46.17 Tn Pd= 31.43 Tn
Pl= 14.12 Tn Pl= 4.98 Tn
P1= 60.28 Tn P2= 36.42 Tn
0.70 m
0.40 m = 0.35 m
Entonces usamos:
b h
V-C 0.40 x 0.80 m2
Estimamos
σn = 8.46 Tn/m2
Az = 8.55 m2 T = 2*S
S= 2.07 m
Preliminar
T= 4.14 m
T T=2S
S
Dimensiones Finales de zapata S = 1.70 m T = 2.90 m
Pu = 1.4Pd + 1.7Pl
Pu= 88.62684 Tn
Wv = 0.77 Tn/m
ΣM2=0
Ru= 106.73 Tn Wnu = Ru/S
Wnu= 62.78 Tn/m
Vx=(Wnu-Wv)Xo-Pu=0
Xo= 1.43 < S OK¡
Mumax = (Wnu-Wv)Xo2/2-Pu(Xo-T1/2)
0.00491
OK
0.00333
As = 9.57 cm2
Vc = 0.53*√f'c*10*b*d = 22.27 Tn OK
Debe ser mayor
Estribos de Montaje
S = 36*Ø = 68.58 cm
Usamos Ø 3/8 @ 50.00 cm
1.20 m
Diseño Final
S = 1.70 m
Viga de Conexión
h = 50.00 cm 5 Ø 3/4
5 Ø 5/8
T = 2.90 m
0.80 cm
4 Ø 3/4
b = 0.40 cm
16 Ø 5/8
DISEÑO DE VIGAS DE CONEXIÓN - BLOQUE A - VIGA DE CONEXIÓN EJE A-C-E-G
7 9
P1 P2
hf
hz
Re 4.90 m.
L1
σ= 1.23 Kg/cm2
hf= 2.00 m
jm= 1.82 Tn/m3
f'c= 210 Kg/cm2
f'y= 4200 Kg/cm2
s/c = 0.20 Tn/m2
Pd= 33.42 Tn Pd= 32.34 Tn
Pl= 9.29 Tn Pl= 9.59 Tn
P1= 42.71 Tn P2= 41.93 Tn
0.70 m
0.28 m = 0.35 m
Entonces usamos:
b h
V-C 0.35 x 0.70 m2
Estimamos
σn = 8.46 Tn/m2
Az = 6.06 m2 T = 2*S
S= 1.74 m
Preliminar
T= 3.48 m
T T=2S
S
Dimensiones Finales de zapata S = 1.25 m T = 2.90 m
Pu = 1.4Pd + 1.7Pl
Pu= 62.581 Tn
Wv = 0.59 Tn/m
ΣM2=0
Ru= 75.16 Tn Wnu = Ru/S
Wnu= 60.13 Tn/m
Vx=(Wnu-Wv)Xo-Pu=0
Xo= 1.05 < S OK¡
Mumax = (Wnu-Wv)Xo2/2-Pu(Xo-T1/2)
0.00521
OK
0.00333
As = 7.22 cm2
Vc = 0.53*√f'c*10*b*d = 16.80 Tn OK
Debe ser mayor
Estribos de Montaje
S = 36*Ø = 68.58 cm
Usamos Ø 3/8 @ 50.00 cm
Diseño Final
S = 1.25 m
Viga de Conexión
h = 50.00 cm 4 Ø 3/4
6 Ø 5/8
T = 2.90 m
0.70 cm
3 Ø 3/4
b = 0.35 cm
10 Ø 5/8
DISEÑO DE VIGAS DE CONEXIÓN - BLOQUE A - VIGA DE CONEXIÓN EJE 1
6 71
P1 P2
hf
hz
Re 4.90 m.
L1
σ= 1.23 Kg/cm2
hf= 2.00 m
jm= 1.82 Tn/m3
f'c= 210 Kg/cm2
f'y= 4200 Kg/cm2
s/c = 0.20 Tn/m2
Pd= 15.92 Tn Pd= 14.89 Tn
Pl= 4.13 Tn Pl= 3.80 Tn
P1= 20.05 Tn P2= 18.69 Tn
0.70 m
0.13 m = 0.35 m
Entonces usamos:
b h
V-C 0.30 x 0.60 m2
Estimamos
σn = 8.46 Tn/m2
Az = 2.84 m2 T = 2*S
S= 1.19 m
Preliminar
T= 2.38 m
T T=2S
S
Dimensiones Finales de zapata S = 0.95 m T = 1.90 m
Pu = 1.4Pd + 1.7Pl
Pu= 29.309 Tn
Wv = 0.43 Tn/m
ΣM2=0
Ru= 33.48 Tn Wnu = Ru/S
Wnu= 35.24 Tn/m
Vx=(Wnu-Wv)Xo-Pu=0
Xo= 0.84 < S OK¡
Mumax = (Wnu-Wv)Xo2/2-Pu(Xo-T1/2)
0.00377
OK
0.00333
As = 5.20 cm2
Vc = 0.53*√f'c*10*b*d = 12.10 Tn OK
Debe ser mayor
Estribos de Montaje
S = 36*Ø = 57.16 cm
Usamos Ø 3/8 @ 50.00 cm
0.30 m
Diseño Final
S = 0.95 m
Viga de Conexión
h = 50.00 cm 3 Ø 5/8
5 Ø 5/8
T = 1.90 m
0.60 cm
3 Ø 5/8
b = 0.30 cm
16 Ø 5/8