Documentos de Académico
Documentos de Profesional
Documentos de Cultura
ACTIVIDADES S/.
Servicio de ingenieria S/ 8,000.00
Preparacion de maquina S/ 110,000.00
Recepcion S/ 65,000.00
Empaque S/ 32,000.00
Supervision de la produccion S/ 46,000.00
TOTAL S/ 261,000.00
Se pide:
* Aplicando los costos ABC, determine el costo de produccion de cada modelo de produccion
SOLUCION:
Distribucion de los CIF según costos ABC:
DETALLE
Serv. Ingenieria S M L
S/ 8,000.00 S/ 1,600.00 S/ 2,560.00 S/ 3,840.00
S/ 25.00 S/ 0.04 S/ 0.07 S/ 0.32
S/ 320.00
Repar. Maquin.
S/ 110,000.00 S/ 27,500.00 S/ 36,666.67 S/ 45,833.33
S/ 6.00 S/ 0.69 S/ 1.05 S/ 3.82
S/ 18,333.33
Recepcion
S/ 65,000.00 S/ 17,105.26 S/ 20,526.32 S/ 27,368.42
S/ 190.00 S/ 0.43 S/ 0.59 S/ 2.28
S/ 342.11
Empaque
S/ 32,000.00 S/ 9,481.48 S/ 5,925.93 S/ 16,592.59
S/ 27.00 S/ 0.24 S/ 0.17 S/ 1.38
S/ 1,185.19
Supervicion
S/ 46,000.00 S/ 5,750.00 S/ 17,250.00 S/ 23,000.00
S/ 40.00 S/ 0.14 S/ 0.49 S/ 1.92
S/ 1,150.00
DETALLE S M L
MPD S/ 22.00 S/ 19.00 S/ 8.00
MOD S/ 7.00 S/ 10.00 S/ 9.00
CIF:
Serv. Ing. S/ 0.04 S/ 0.07 S/ 0.32
Maquinaria S/ 0.69 S/ 1.05 S/ 3.82
Recepcion S/ 0.43 S/ 0.59 S/ 2.28
Empaque S/ 0.24 S/ 0.17 S/ 1.38
Supervicion S/ 0.14 S/ 0.49 S/ 1.92
COSTO DE PRODUCCION S/ 30.54 S/ 31.37 S/ 26.72