PTTO
PESO A PROCESAR (KG) :
TANQUE (KG) 22,391
ESTRUCTURA DE SOPORTE (kg) 15,504
PUENTE (kg) 13,300
CONSIDERACIONES PRELIMINARES:
29649.47
MANO DE OBRA DIRECTA
MOD HAUG 29649.47
MOD SUBCONTRATADA 0.00
MATERIALES 93040.65
ACERO 67787.75
PINTURA 16137.25
ACCESORIOS / PERNERIA 1392.23
CONSUMIBLES FABRICACION 7027.71
MATERIALES HSE Y EPP 695.71
EQUIPOS Y HERRAMIENTAS 18221.80
EQUIPOS PROPIOS 9502.10
COMBUSTIBLE 1784.12
ALQUILER EQUIPOS TERCEROS 5504.84
HERRAMIENTAS 1430.75
MANTENIMIENTO EQUIPOS 0.00
SUBCONTRATOS 1220.47
DE FABRICACIÓN 330.85
DE CALIDAD 889.62
COSTOS INDIRECTOS 12046.78
MANO DE OBRA INDIRECTA 9025.61
DE PLANTA LURIN 1194.63
INGENIERIA 7830.98
TRANSPORTE MATERIAL 2746.48
SC TRANSPORTE 0.00
CONSUMIBLES EMBALAJE 2746.48
GASTO GENERAL 274.69
COSTO INDUSTRIAL LURIN 154179.16
DISTRIBUCION DE COSTOS INDIRECTOS 22090.33
COSTO FABRICACION LURIN 176269.49
GASTOS OFICINA CENTRAL (AOC) 11996.36
GASTOS FINANCIEROS 5201.06
UTILIDAD 23862.56
PRECIO VENTA 217329.48
%UTILIDAD 11%
Nota:
(1) CONSIDERAR 5142 KG (US$ 5656.2) DE ACERO DEL DUAL (STOCK ALMACEN).
COD. REPORTE
VM-2150-PL-Rev.0
VALOR META
FECHA REPORTE
29-oct-2021
SADORES
MESES : 3.0
VALOR META
123393.00
20204.45
20204.45
0.00
76901.00
52533 (1)
16137.00
940.00
6595.00
696.00
25067.00
16347.00
1784.00
5505.00
1431.00
0.00
1221.00
331.00
890.00
12047.00
9026.00
1195.00
7831.00
2746.00
0.00
2746.00
275.00
135440.00
22090.33
157530.00
11996.36
5201.06
42602.00
217329.48
20%
ALMACEN).
FECHA Wednesday, October 20, 2021
1 2 3
m2 toneladas
fondo 508.9 13.44
Casco 339.3 8.82
Casco
Fondo
Estructuras
Barandas
165.675 12.71638751
4 5 6 7 8 9 10
Area Und Inc Peso Peso Unit (kg) Cant. Peso Tot (kg) Ratio (kg/hh)
Macroproceso
Habilitado
Habilitado
Caldereria
Caldereria
Caldereria
Rolado
Caldereria
Caldereria
Soldadura
Pre-Ensamble
Granallado
Pintura
Pasivado
0.35 4.9% 4.9%
Ratio 1.6 22.6% 22.6%
37.878801637 1.5 21.2% 21.2%
38.461550669 1.2 16.9% 16.9%
0.8 11.3% 11.3%
1.63 23.0% 23.0%
7.08
Habilitado
Habilitado
Caldereria
Caldereria
Caldereria
Rolado
Caldereria
Caldereria
Soldadura
Pre-Ensamble
Granallado
Pintura
Pasivado
11 12 13 14 15 16 17 18
CORTE BISEL CORTE
EFICIENCIA Ratio (kg/hh) HH CORT PAN CORT FICEP
AMOLAD C/AMOL OXICOR
90% 34.20 257.94 8.3% 0.0% 0.0% 0.0% 0.0%
90% 4.05 33.06 4.8% 0.0% 0.7% 0.0% 1.5%
90% 18.00 746.44 4.9% 0.0% 0.0% 0.0% 0.0%
90% 11.25 795.25 2.0% 1.1% 1.0% 0.3% 3.9%
90% 11.25 582.92 2.0% 1.1% 1.0% 0.3% 3.9%
90% 7.20 1,704.83 2.0% 1.1% 1.0% 0.3% 3.9%
90% 3.60 284.78 2.0% 1.1% 1.0% 0.3% 3.9%
100% 60.00 221.67 0.0% 0.0% 0.0% 0.0% 0.0%
100% 60.00 60.29 0.0% 0.0% 0.0% 0.0% 0.0%
4,687.18
48863.00
0.33
H. MA
63
19 0 0
H. MAQ
823
349 H. MAQ
180
102 107
9 0 0
SOLDADURA FCAW Total HH 822.70
Unds Ratio Cant Total Und PREC UNIT
Almbre kg Aporte/HH 0.52 425.3 Kg Aporte 3.1
Gases CO2 kg CO2/HH 1.09 464.5 Kg CO2 1.5
Discos Corte Nº Discos/HH 0.20 83.8 Nº Discos 2.5
Total
Peso (kg)
Ratio (US$/kg)
CST TOTAL
84.68
84.68
50,170.67
0.00
COSTO EPS
ÍTEM DESCRIPCIÓN
GALON
Touch
Touch
Perfil m2/m
w6x25 0.924
w6x15 0.896
w8x18 0.929
L4xL4x1/4 0.401
L2 1/2xL2 1/2x1/4 0.25
L6xL3 1/2 x 5/16 0.475
L2xL2x1/4 0.2
w8x67 1.277
w8x24 1.042
w12x35 1.287
L3xL3x1/4 0.298
Cant. US$
Rteor Rpract %
% Vol Sold % desp Pintura -----
m2/gal m2/gal Dilusión
gal/m2 Galn.
0.0829
3.12
-
Puente
Formato
Perfil 6 mts 9 mts 12 mts Stock
w6x25 1 4 0
w6x15 5 0
w6x12 1 5 0
w8x18 1 1 viga, en zona de
L4x4x1/4 30 6
L2 1/2x2 1/2 x 1/4 1 1 reemplazar angulo 2 1/2"
canal C8x11.5 2 1 canal de 6 mts, en zo
Espesador
Formato
Perfil 6 mts 9 mts 12 mts Stock
w8x24 2 8 0
w12x35 16 0
L4x4x1/4 11 11
L3x3x1/4 12 0