Está en la página 1de 2

AVANCE DE OBRA - LAMPA

ENTIDAD : EMAPE S.A CONSULTOR DE LA RESIDENCIA : CONSULTORES BIM EIRL

LUGAR : CENTRO HISTORICO DE LIMA, DISTRITO DE LIMA, PROVINCIA DE LIMA -LIMA CONSULTOR DE LA SUPERVISION: DELGADO MONCADA MANUEL ANTONIO
mes 1
MES 01 MES 02 MES 03 MES 04 MES 05
Obra: MEJORAMIENTO Y REDISEÑO DE VIAS DE LOS JIRONES LAMPA (CUADRAS 1, 2, 3, 4, 5), AMAZONAS (CUADRA 1), JUNIN (CUADRA 3,4), ANCASH (CUADRA 3 Y 4), AZANGARO (CUADRAS 1, 2, 3, 4) Y HUALLAGA (CUADRA 3 Y 4)
SEMANA 01 SEMANA 02 SEMANA 03 SEMANA 04 SEMANA 05 SEMANA 06 SEMANA 07 SEMANA 08 SEMANA 09 SEMANA 10 SEMANA 11 SEMANA 12 SEMANA 11 SEMANA 12 SEMANA 13 SEMANA 14 SEMANA 15 SEMANA 16 SEMANA 17 SEMANA 18

ITEM PARTIDA UND. METRADO P.U. SUB TOTAL MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/.

1.00 OBRAS GENERALES 248,553.51


1.01 OBRAS PROVISIONALES 59,245.54 0.00
1.01.02 CERCO PERIMETRICO DESMONTABLE Y TEMPORAL m 48.60 139.24 6,767.06 48.60 100.00% 6,767.06 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% ###
0.00
1.01.03 CERCO PROVISIONAL DE MALLA HDP H=1.00M m 48.60 10.52 511.27 48.60 100.00% 511.27 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% ###
0.00
1.01.04 ALQUILER DE ALMACEN, OFICINA Y CASETA DE GUARDIANIA mes 5.00 9,558.00 47,790.00 0.25 5.00% 119.48 0.25 5.00% 119.48 0.25 5.00% 119.48 0.25 5.00% 119.48 0.25 5.00% 119.48 0.25 5.00% 119.48 0.25 5.00% 119.48 0.25 5.00% 119.48 0.25 5.00% 119.48 0.25 5.00% 119.48 0.25 5.00% 119.48 0.25 5.00% 119.48 0.25 5.00% 119.48 0.25 5.00% 119.48 0.25 5.00% 119.48 0.25 5.00% 119.48 0.25 5.00% 119.48 0.25 5.00% 119.48 0.25 5.00% 119.48 0.25 5.00% ###
119.48
1.01.05 BAÑOS QUIMICOS PARA EL PERSONAL mes 5.00 835.44 4,177.20 0.25 5.00% 10.44 0.25 5.00% 10.44 0.25 5.00% 10.44 0.25 5.00% 10.44 0.25 5.00% 10.44 0.25 5.00% 10.44 0.25 5.00% 10.44 0.25 5.00% 10.44 0.25 5.00% 10.44 0.25 5.00% 10.44 0.25 5.00% 10.44 0.25 5.00% 10.44 0.25 5.00% 10.44 0.25 5.00% 10.44 0.25 5.00% 10.44 0.25 5.00% 10.44 0.25 5.00% 10.44 0.25 5.00% 10.44 0.25 5.00% 10.44 0.25 5.00% ###
10.44
1.02 INSTALACIONES PROVISIONALES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
1.02.06 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS Y HERRAMIENTAS glb - 21,052.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
1.03 SEGURIDAD Y SALUD EN OBRA 57,924.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
1.03.01 ELABORACIÓN, IMPLEMENTACIÓN Y ADMINISTRACIÓN DE PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO glb 0.29 21,981.21 6,264.64 0.01 5.00% 15.66 0.01 5.00% 15.66 0.01 5.00% 15.66 0.01 5.00% 15.66 0.01 5.00% 15.66 0.01 5.00% 15.66 0.01 5.00% 15.66 0.01 5.00% 15.66 0.01 5.00% 15.66 0.01 5.00% 15.66 0.01 5.00% 15.66 0.01 5.00% 15.66 0.01 5.00% 15.66 0.01 5.00% 15.66 0.01 5.00% 15.66 0.01 5.00% 15.66 0.01 5.00% 15.66 0.01 5.00% 15.66 0.01 5.00% 15.66 0.01 5.00% ###
15.66
1.03.02 IMPLEMENTACIÓN DE EQUIPOS DE PROTECCIÓN INDIVIDUAL glb 0.29 33,723.06 9,611.07 0.01 5.00% 24.03 0.01 5.00% 24.03 0.01 5.00% 24.03 0.01 5.00% 24.03 0.01 5.00% 24.03 0.01 5.00% 24.03 0.01 5.00% 24.03 0.01 5.00% 24.03 0.01 5.00% 24.03 0.01 5.00% 24.03 0.01 5.00% 24.03 0.01 5.00% 24.03 0.01 5.00% 24.03 0.01 5.00% 24.03 0.01 5.00% 24.03 0.01 5.00% 24.03 0.01 5.00% 24.03 0.01 5.00% 24.03 0.01 5.00% 24.03 0.01 5.00% ###
24.03
1.03.03 IMPLEMENTACIÓN DE EQUIPOS DE PROTECCIÓN COLECTIVA glb 0.29 4,720.33 1,345.29 0.01 5.00% 3.36 0.01 5.00% 3.36 0.01 5.00% 3.36 0.01 5.00% 3.36 0.01 5.00% 3.36 0.01 5.00% 3.36 0.01 5.00% 3.36 0.01 5.00% 3.36 0.01 5.00% 3.36 0.01 5.00% 3.36 0.01 5.00% 3.36 0.01 5.00% 3.36 0.01 5.00% 3.36 0.01 5.00% 3.36 0.01 5.00% 3.36 0.01 5.00% 3.36 0.01 5.00% 3.36 0.01 5.00% 3.36 0.01 5.00% 3.36 0.01 5.00% ###
3.36
1.03.04 CAPACITACION EN SEGURIDAD Y SALUD glb 0.29 8,608.00 2,453.28 0.01 5.00% 6.13 0.01 5.00% 6.13 0.01 5.00% 6.13 0.01 5.00% 6.13 0.01 5.00% 6.13 0.01 5.00% 6.13 0.01 5.00% 6.13 0.01 5.00% 6.13 0.01 5.00% 6.13 0.01 5.00% 6.13 0.01 5.00% 6.13 0.01 5.00% 6.13 0.01 5.00% 6.13 0.01 5.00% 6.13 0.01 5.00% 6.13 0.01 5.00% 6.13 0.01 5.00% 6.13 0.01 5.00% 6.13 0.01 5.00% 6.13 0.01 5.00% ###
6.13
1.03.05 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 0.29 42,843.80 12,210.48 0.01 5.00% 30.53 0.01 5.00% 30.53 0.01 5.00% 30.53 0.01 5.00% 30.53 0.01 5.00% 30.53 0.01 5.00% 30.53 0.01 5.00% 30.53 0.01 5.00% 30.53 0.01 5.00% 30.53 0.01 5.00% 30.53 0.01 5.00% 30.53 0.01 5.00% 30.53 0.01 5.00% 30.53 0.01 5.00% 30.53 0.01 5.00% 30.53 0.01 5.00% 30.53 0.01 5.00% 30.53 0.01 5.00% 30.53 0.01 5.00% 30.53 0.01 5.00% ###
30.53
1.03.06 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO glb 0.29 16,232.08 4,626.14 0.01 5.00% 11.57 0.01 5.00% 11.57 0.01 5.00% 11.57 0.01 5.00% 11.57 0.01 5.00% 11.57 0.01 5.00% 11.57 0.01 5.00% 11.57 0.01 5.00% 11.57 0.01 5.00% 11.57 0.01 5.00% 11.57 0.01 5.00% 11.57 0.01 5.00% 11.57 0.01 5.00% 11.57 0.01 5.00% 11.57 0.01 5.00% 11.57 0.01 5.00% 11.57 0.01 5.00% 11.57 0.01 5.00% 11.57 0.01 5.00% 11.57 0.01 5.00% ###
11.57
1.03.07 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL glb 0.29 75,134.22 21,413.25 0.01 5.00% 53.53 0.01 5.00% 53.53 0.01 5.00% 53.53 0.01 5.00% 53.53 0.01 5.00% 53.53 0.01 5.00% 53.53 0.01 5.00% 53.53 0.01 5.00% 53.53 0.01 5.00% 53.53 0.01 5.00% 53.53 0.01 5.00% 53.53 0.01 5.00% 53.53 0.01 5.00% 53.53 0.01 5.00% 53.53 0.01 5.00% 53.53 0.01 5.00% 53.53 0.01 5.00% 53.53 0.01 5.00% 53.53 0.01 5.00% 53.53 0.01 5.00% ###
53.53
1.04 PLAN PARA LA VIGILANCIA, PREVENCIÓN Y CONTROL DE COVID-19 EN EL TRABAJO 86,908.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
1.04.01 IMPLEMENTACIÓN DEL PLAN DE VIGILANCIA COVID-19 ANTES DEL INICIO DE LABORES glb 0.29 70,328.40 20,043.59 0.01 5.00% 50.11 0.01 5.00% 50.11 0.01 5.00% 50.11 0.01 5.00% 50.11 0.01 5.00% 50.11 0.01 5.00% 50.11 0.01 5.00% 50.11 0.01 5.00% 50.11 0.01 5.00% 50.11 0.01 5.00% 50.11 0.01 5.00% 50.11 0.01 5.00% 50.11 0.01 5.00% 50.11 0.01 5.00% 50.11 0.01 5.00% 50.11 0.01 5.00% 50.11 0.01 5.00% 50.11 0.01 5.00% 50.11 0.01 5.00% 50.11 0.01 5.00% ###
50.11
1.04.02 PLAN DE VIGILANCIA COVID-19 EN LA ETAPA DE EJECUCIÓN EFECTIVA glb 0.29 234,614.46 66,865.12 0.01 5.00% 167.16 0.01 5.00% 167.16 0.01 5.00% 167.16 0.01 5.00% 167.16 0.01 5.00% 167.16 0.01 5.00% 167.16 0.01 5.00% 167.16 0.01 5.00% 167.16 0.01 5.00% 167.16 0.01 5.00% 167.16 0.01 5.00% 167.16 0.01 5.00% 167.16 0.01 5.00% 167.16 0.01 5.00% 167.16 0.01 5.00% 167.16 0.01 5.00% 167.16 0.01 5.00% 167.16 0.01 5.00% 167.16 0.01 5.00% 167.16 0.01 5.00% ###
167.16
1.05 MITIGACION AMBIENTAL 44,475.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
1.05.01 PROGRAMA DE MEDIDAS PREVENTIVAS, MITIGADORAS Y CORRECTIVAS glb 0.29 18,349.00 5,229.47 0.01 5.00% 13.07 0.01 5.00% 13.07 0.01 5.00% 13.07 0.01 5.00% 13.07 0.01 5.00% 13.07 0.01 5.00% 13.07 0.01 5.00% 13.07 0.01 5.00% 13.07 0.01 5.00% 13.07 0.01 5.00% 13.07 0.01 5.00% 13.07 0.01 5.00% 13.07 0.01 5.00% 13.07 0.01 5.00% 13.07 0.01 5.00% 13.07 0.01 5.00% 13.07 0.01 5.00% 13.07 0.01 5.00% 13.07 0.01 5.00% 13.07 0.01 5.00% ###
13.07
1.05.02 PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS glb 0.29 11,888.50 3,388.22 0.01 5.00% 8.47 0.01 5.00% 8.47 0.01 5.00% 8.47 0.01 5.00% 8.47 0.01 5.00% 8.47 0.01 5.00% 8.47 0.01 5.00% 8.47 0.01 5.00% 8.47 0.01 5.00% 8.47 0.01 5.00% 8.47 0.01 5.00% 8.47 0.01 5.00% 8.47 0.01 5.00% 8.47 0.01 5.00% 8.47 0.01 5.00% 8.47 0.01 5.00% 8.47 0.01 5.00% 8.47 0.01 5.00% 8.47 0.01 5.00% 8.47 0.01 5.00% ###
8.47
1.05.03 PROGRAMA DE MONITOREO AMBIENTAL glb 0.29 28,674.00 8,172.09 0.01 5.00% 20.43 0.01 5.00% 20.43 0.01 5.00% 20.43 0.01 5.00% 20.43 0.01 5.00% 20.43 0.01 5.00% 20.43 0.01 5.00% 20.43 0.01 5.00% 20.43 0.01 5.00% 20.43 0.01 5.00% 20.43 0.01 5.00% 20.43 0.01 5.00% 20.43 0.01 5.00% 20.43 0.01 5.00% 20.43 0.01 5.00% 20.43 0.01 5.00% 20.43 0.01 5.00% 20.43 0.01 5.00% 20.43 0.01 5.00% 20.43 0.01 5.00% ###
20.43
1.05.04 PROGRAMA DE RELACIONES COMUNITARIAS glb 0.29 8,496.00 2,421.36 0.01 5.00% 6.05 0.01 5.00% 6.05 0.01 5.00% 6.05 0.01 5.00% 6.05 0.01 5.00% 6.05 0.01 5.00% 6.05 0.01 5.00% 6.05 0.01 5.00% 6.05 0.01 5.00% 6.05 0.01 5.00% 6.05 0.01 5.00% 6.05 0.01 5.00% 6.05 0.01 5.00% 6.05 0.01 5.00% 6.05 0.01 5.00% 6.05 0.01 5.00% 6.05 0.01 5.00% 6.05 0.01 5.00% 6.05 0.01 5.00% 6.05 0.01 5.00% ###
6.05
1.05.05 PROGRAMA DE EDUCACION Y CAPACITACION AMBIENTAL glb 0.29 40,586.00 11,567.01 0.01 5.00% 28.92 0.01 5.00% 28.92 0.01 5.00% 28.92 0.01 5.00% 28.92 0.01 5.00% 28.92 0.01 5.00% 28.92 0.01 5.00% 28.92 0.01 5.00% 28.92 0.01 5.00% 28.92 0.01 5.00% 28.92 0.01 5.00% 28.92 0.01 5.00% 28.92 0.01 5.00% 28.92 0.01 5.00% 28.92 0.01 5.00% 28.92 0.01 5.00% 28.92 0.01 5.00% 28.92 0.01 5.00% 28.92 0.01 5.00% 28.92 0.01 5.00% ###
28.92
1.05.06 PROGRAMA DE CIERRE DE OBRAS glb 0.29 48,059.45 13,696.94 0.01 5.00% 34.24 0.01 5.00% 34.24 0.01 5.00% 34.24 0.01 5.00% 34.24 0.01 5.00% 34.24 0.01 5.00% 34.24 0.01 5.00% 34.24 0.01 5.00% 34.24 0.01 5.00% 34.24 0.01 5.00% 34.24 0.01 5.00% 34.24 0.01 5.00% 34.24 0.01 5.00% 34.24 0.01 5.00% 34.24 0.01 5.00% 34.24 0.01 5.00% 34.24 0.01 5.00% 34.24 0.01 5.00% 34.24 0.01 5.00% 34.24 0.01 5.00% ###
34.24
2.00 ESTRUCTURAS 550,619.11 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR 22,859.22 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.01.01 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR C/EQUIPO m2 5,035.07 1.75 8,811.37 500.00 9.93% 86.89 600.00 11.92% 125.12 0.00% 0.00 0.00% 0.00 600.00 11.92% 125.12 500.00 9.93% 86.89 313.38 6.22% 34.13 0.00% 0.00 442.12 8.78% 67.94 442.12 8.78% 67.94 442.12 8.78% 67.94 0.00% 0.00 398.83 7.92% 55.29 398.25 7.91% 55.13 398.25 7.91% 55.13 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.01.02 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO DE OBRA m2 5,035.07 2.79 14,047.85 500.00 9.93% 138.53 600.00 11.92% 199.48 0.00% 0.00 0.00% 0.00 600.00 11.92% 199.48 500.00 9.93% 138.53 313.38 6.22% 54.42 0.00% 0.00 442.12 8.78% 108.31 442.12 8.78% 108.31 442.12 8.78% 108.31 0.00% 0.00 398.83 7.92% 88.14 398.25 7.91% 87.89 398.25 7.91% 87.89 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.02 DEMOLICIONES 96,769.09 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.02.01 DEMOLICION DE VEREDA DE CONCRETO m2 54.63 27.28 1,490.31 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 43.34 79.33% 937.97 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 11.29 20.67% 63.65 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.02.02 DEMOLICION DE SARDINEL DE CONCRETO PERALTADO m - 13.64 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.02.03 DEMOLICION DE SARDINEL DE CONCRETO SUMERGIDO m 750.59 13.64 10,238.05 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 178.46 23.78% 578.75 0.00% 0.00 0.00% 0.00 0.00% 0.00 126.00 16.79% 288.50 126.00 16.79% 288.50 0.00% 0.00 0.00% 0.00 160.07 21.33% 465.59 160.07 21.33% 465.59 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.02.04 DEMOLICION DE RAMPAS DE ACCESO EN VEREDA m2 20.76 27.28 566.33 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 12.48 60.12% 204.67 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 4.14 19.94% 22.52 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 4.14 19.94% 22.52 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.02.05 DEMOLICION DE RAMPAS EN PISTAS m2 - 27.28 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.02.06 DEMOLICION DE BASE DE MARTILLOS Y VEREDAS DE LAJA m2 212.53 28.22 5,997.60 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 30.00 14.12% 119.50 61.92 29.13% 509.09 0.00% 0.00 0.00% 0.00 23.00 10.82% 70.24 24.00 11.29% 76.48 23.00 10.82% 70.24 0.00% 0.00 25.30 11.90% 84.99 25.31 11.91% 85.06 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.02.07 DEMOLICION DE CARPETA ASFALTICA m2 1,053.98 30.01 31,629.94 60.00 5.69% 102.50 - 0.00% 0.00 252.00 23.91% 1,808.15 528.00 50.10% 7,937.82 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 53.50 5.08% 81.48 53.50 5.08% 81.48 0.00% 0.00 0.00% 0.00 53.50 5.08% 81.48 53.50 5.08% 81.48 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.02.08 DEMOLICION DE LOSA DE CONCRETO EN PISTA m2 291.61 50.01 14,583.17 60.00 20.58% 617.40 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 30.00 10.29% 154.35 87.20 29.90% 1,304.05 0.00% 0.00 0.00% 0.00 57.20 19.62% 561.12 57.21 19.62% 561.22 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% 0.00
###
2.02.09 ELIMINACION DE MATERIAL DEMOLICION m3 299.79 85.67 25,683.01 18.00 6.00% 92.59 - 0.00% 0.00 0.00% 0.00 36.00 12.01% 370.35 54.00 18.01% 833.30 0.00% 0.00 0.00% 0.00 0.00% 0.00 30.71 10.24% 269.51 63.30 21.12% 1,145.13 0.00% 0.00 0.00% 0.00 32.59 10.87% 303.56 32.59 10.87% 303.56 32.59 10.87% 303.56 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.02.10 ELIMINACION DE MATERIAL DE DEMOLICIONES CONTAMINANTES m3 76.81 85.67 6,580.69 18.00 23.43% 361.35 - 0.00% 0.00 36.00 46.87% 1,445.41 22.81 29.70% 580.50 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.03 PAVIMENTOS CARROZABLE (CALZADAS) USANDO PAVIMENTO EXISTENTE 55,132.62 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.03.01 ACONDICIONAMIENTO DE CARPET DE PAVIMENTO EXISTENTE 55,132.62 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.03.01.01 CORTE CON DISCO EN PAVIMENTO ASFALTICO E= 5" PROMEDIO m 1,257.13 6.09 7,655.92 240.00 19.09% 279.04 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 126.00 10.02% 76.91 222.78 17.72% 240.44 0.00% 0.00 0.00% 0.00 445.57 35.44% 961.74 222.78 17.72% 240.44 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.03.01.02 FRESADO PAVIMENTO FLEXIBLE EXISTENTE, E promedio= 0.05m m2 2,414.03 13.67 32,999.79 24.00 0.99% 3.26 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 6.30 0.26% 0.22 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.03.01.03 ELIMINACION DE MATERIAL EXCEDENTE CONTAMINANTE m3 168.98 85.67 14,476.91 18.00 10.65% 164.26 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 40.90 24.20% 848.06 44.03 26.05% 982.68 0.00% 0.00 0.00% 0.00 44.03 26.05% 982.68 22.03 13.04% 246.04 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.04 PAVIMENTO RIGIDO CARROSABLE (CALZADA) CON LOSA DE CONCRETP NUEVO 25,995.10 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.04.01 MOVIMIENTO DE TIERRAS 8,673.68 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.04.01.01 CORTE DE TERRENO A NIVEL DE SUBRASANTE H=0.30M m3 33.09 23.46 776.29 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 19.67 59.44% 274.31 0.00 0.00 6.30 19.04% 28.14 0.00% 0.00 0.00% 0.00 7.12 21.52% 35.94 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% 0.00
###
2.04.01.02 CONFORMACION Y COMPACTACION DE SUBRASANTE E=0.15 M m2 137.79 5.80 799.18 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 56.73 41.17% 135.47 0.00% 0.00 0.00% 0.00 18.90 13.72% 15.04 0.00% 0.00 0.00% 0.00 31.08 22.56% 40.66 31.08 22.56% 40.66 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.04.01.03 SUB-BASE GRANULAR E=0.15 M m2 137.79 16.08 2,215.66 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 56.73 41.17% 375.57 0.00% 0.00 0.00% 0.00 18.90 13.72% 41.69 0.00% 0.00 0.00% 0.00 31.08 22.56% 112.73 31.08 22.56% 112.73 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.04.01.04 ELIMINACION DE MATERIAL EXCEDENTE, D=20KM m3 56.99 85.67 4,882.55 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 21.27 37.32% 680.06 0.00% 0.00 0.00% 0.00 3.78 6.63% 21.48 0.00% 0.00 0.00% 0.00 15.97 28.02% 383.43 15.97 28.02% 383.43 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.04.02 CONFORMACION DE LOSA DE CONCRETO F'C=245KG/CM2 17,321.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.04.02.01 ENCOFRADO Y DESENCOFRADO DE LOSA DE PAVIMENTO m2 34.23 61.81 2,115.76 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 20.00 58.43% 722.29 14.00 40.90% 353.92 0.00% 0.00 10.00 29.21% 180.57 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.04.02.02 LOSA DE CONCRETO F'C=245KG/CM2 CEMENTO TIPO I, h=0.175M m2 137.79 70.67 9,737.62 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 30.00 21.77% 461.59 30.00 21.77% 461.59 60.00 43.54% 1,846.37 40.00 29.03% 820.61 0.00% 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.04.02.03 TEXTURIZADO DEL CONCRETO EN RAMPA VEHICULAR m2 22.71 2.55 57.91 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 11.36 50.00% 14.48 50.00% 0.00 0.00% 0.00 0.00% 0.00 11.36 50.00% 14.48 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.04.02.04 CURADO DE LOSA DE PAVIMENTO Y RAMPA VEHICULAR m2 103.77 2.02 209.62 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 51.89 50.00% 52.40 0.00% 0.00 0.00% 0.00 0.00% 0.00 51.89 50.00% 52.40 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.04.02.05 CORTE CON DISCO EN JUNTAS DE CONTRACCION EN LOSA DE PAVIMENTO m - 5.48 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.04.02.06 JUNTAS DE DILATACION C/MEZCLA ASFALTICA EN LOSA DE PAVIMENTO m 183.00 4.54 830.81 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 91.50 50.00% 207.70 0.00% 0.00 0.00% 0.00 0.00% 0.00 91.50 50.00% 207.70 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.04.02.07 JUNTAS CON SELLO ELASTOMERICO EN LOSA DE PAVIMENTO m 183.00 8.73 1,597.58 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 91.50 50.00% 399.39 0.00% 0.00 0.00% 0.00 0.00% 0.00 91.50 50.00% 399.39 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% 0.00
###
2.04.02.08 TECHO DE BUZON DE ALCANTARILLADO, INCLUYE ARMADURA und 3.00 924.04 2,772.12 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 1.00 33.33% 308.01 0.00% 0.00 0.00% 0.00 0.00% 0.00 2.00 66.67% 1,232.05 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.05 PAVIMENTO DE USO PEATONAL (VEREDAS) 344,824.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.05.01 MOVIMIENTO DE TIERRAS 172,706.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.05.01.01 CORTE DE TERRENO A NIVEL DE SUBRASANTE, h=0.20 m m3 639.02 33.27 21,260.20 20.00 3.13% 20.83 99.40 15.56% 514.41 44.28 6.93% 102.08 80.00 12.52% 333.21 70.00 10.95% 255.12 85.00 13.30% 376.16 0.00% 0.00 0.00% 0.00 57.00 8.92% 169.16 57.00 8.92% 169.16 47.00 7.36% 115.01 0.00% 0.00 39.00 6.10% 79.19 40.34 6.31% 84.72 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.05.01.02 CONFORMACION Y COMPACTACION C/EQUIPO LIVIANO, MATERIAL PROPIO, E=0.15M m2 2,683.13 9.96 26,723.97 100.00 3.73% 37.12 497.00 18.52% 916.92 123.00 4.58% 56.16 40.00 1.49% 5.94 350.00 13.04% 454.73 350.00 13.04% 454.73 0.00% 0.00 0.00% 0.00 189.00 7.04% 132.60 189.00 7.04% 132.60 189.00 7.04% 132.60 145.07 5.41% 78.12 183.00 6.82% 124.31 183.00 6.82% 124.31 145.07 5.41% 78.12 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.05.01.03 BASE GRANULAR C/EQUIPO LIVIANO E=0.15 m m2 2,683.13 20.98 56,292.07 0.00% 0.00 380.00 14.16% 1,129.10 260.00 9.69% 528.58 80.00 2.98% 50.04 350.00 13.04% 957.86 350.00 13.04% 957.86 0.00% 0.00 0.00% 0.00 189.00 7.04% 279.31 189.00 7.04% 279.31 189.00 7.04% 279.31 145.07 5.41% 164.55 183.00 6.82% 261.86 183.00 6.82% 261.86 185.07 6.90% 267.80 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.05.01.04 ELIMINACIÓN DE MATERIAL EXCEDENTE D=20Km m3 798.77 85.67 68,430.68 0.00% 0.00 72.00 9.01% 556.00 36.00 4.51% 139.00 72.00 9.01% 556.00 21.00 2.63% 47.30 25.50 3.19% 69.74 0.00% 0.00 0.00% 0.00 17.10 2.14% 31.36 17.10 2.14% 31.36 14.10 1.77% 21.32 14.10 1.77% 21.32 11.70 1.46% 14.68 12.10 1.52% 15.71 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.05.02 CONFORMACION DE LOSA DE CONCRETO VEREDA F'C=175KG/CM2 172,117.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.05.02.01 ENCONFRADO Y DESENCOFRADO LOSA DE CONCRETO EN VEREDA m2 206.12 45.52 9,382.58 0.00% 0.00 25.00 12.13% 138.03 36.00 17.47% 286.21 15.00 7.28% 49.69 0.00% 0.00 80.00 38.81% 1,413.39 80.00 38.81% 1,413.39 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 29.88 -14.50% 197.17 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.05.02.02 CONCRETO f'c=175 kg/cm2 EN LOSA DE VERDA, E=0.10M m2 2,683.13 49.24 132,117.32 0.00% 0.00 150.00 5.59% 412.91 235.00 8.76% 1,013.47 235.00 8.76% 1,013.47 0.00% 0.00 350.00 13.04% 2,248.08 320.00 11.93% 1,879.21 195.00 7.27% 697.82 0.00% 0.00 94.50 3.52% 163.89 94.50 3.52% 163.89 94.50 3.52% 163.89 0.00% 0.00 914.63 34.09% 15,352.08 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.05.02.03 CURADO DE LOSA DE CONCRETO EN VEREDAS m2 2,683.13 1.88 5,044.28 0.00% 0.00 150.00 5.59% 15.77 235.00 8.76% 38.69 235.00 8.76% 38.69 0.00% 0.00 350.00 13.04% 85.83 320.00 11.93% 71.75 195.00 7.27% 26.64 0.00% 0.00 94.50 3.52% 6.26 94.50 3.52% 6.26 94.50 3.52% 6.26 0.00% 0.00 914.63 34.09% 586.15 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% 0.00
###
2.05.02.04 CORTE CON DISCO EN JUNTAS DE CONTRACCION EN LOSA DE VEREDA m 670.35 4.55 3,050.09 0.00% 0.00 50.00 7.46% 16.97 127.00 18.95% 109.48 127.00 18.95% 109.48 0.00% 0.00 82.16 12.26% 45.82 82.16 12.26% 45.82 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 202.03 30.14% 277.04 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.05.02.05 JUNTAS DE DILATACION C/MEZCLA ASFALTICA EN VEREDA DE CONCRETO m 1,697.30 4.54 7,705.74 0.00% 0.00 50.00 2.95% 6.69 127.00 7.48% 43.14 127.00 7.48% 43.14 0.00% 0.00 175.00 10.31% 81.92 175.00 10.31% 81.92 0.00% 0.00 0.00% 0.00 272.00 16.03% 197.90 272.00 16.03% 197.90 0.00% 0.00 0.00% 0.00 499.30 29.42% 666.84 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.05.02.06 JUNTAS CON SELLO ELASTOMERICO EN LOSA DE CONCRETO m 1,697.30 8.73 14,817.43 0.00% 0.00 50.00 2.95% 12.86 127.00 7.48% 82.96 127.00 7.48% 82.96 0.00% 0.00 175.00 10.31% 157.52 175.00 10.31% 157.52 0.00% 0.00 0.00% 0.00 272.00 16.03% 380.53 272.00 16.03% 380.53 0.00% 0.00 0.00% 0.00 499.30 29.42% 1,282.27 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.06 ESTRUCTURAS DE SARDINELES SUMERGIDOS S1 Y S2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.06.01 EXCAVACION A MANO EN TERRENO NORMAL m3 78.77 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.06.02 ELIMINACION DE MATERIAL EXCEDENTE A UNA DISTANCIA d=20KM C/VOLQUETE m3 - 85.67 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.06.03 ENCOFRADO Y DESENCOFRADO EN SARDINEL m2 - 47.65 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.06.04 CONCRETO SARDINELES F'C=175 KG/CM2 m3 - 391.07 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.06.05 ACERO DE REFUERZO fy=4,200 kg/cm2 kg - 5.87 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.06.06 CURADO DE SARDINELES m2 - 1.77 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.07 MOBILIARIO URBANO 5,038.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
###
2.07.01 MOVIMIENTO DE TIERRAS 717.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.07.01.01 EXCAVACIONES PARA CIMIENTOS m3 5.44 45.01 244.85 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 3.00 55.15% 74.47 2.44 44.85% 49.26 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.07.01.02 BASE DE AFIRMADO H=0.20 m m2 - 35.44 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.07.01.03 ELIMINACIÓN DE MATERIAL EXCEDENTE m3 5.52 85.67 472.68 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 3.00 54.37% 139.74 2.52 45.67% 98.60 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.07.02 CONCRETO 4,321.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.07.02.01 CONCRETO PARA SOLADO F'C=100 KG/CM2 m2 - 30.36 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.07.02.02 NIVELACION TOPOGRAFICA DE BUZONES und 34.19 56.48 1,931.05 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 17.10 50.00% 482.76 0.00% 0.00 0.00% 0.00 0.00% 0.00 17.10 50.00% 482.76 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.07.02.03 CONCRETO f'c=175 kg/cm2 m3 5.25 316.13 1,659.68 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 2.75 52.38% 455.38 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 2.50 47.62% 376.35 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
2.07.02.04 CONCRETO F'C=210 KG/CM2 m3 - 405.85 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
2.07.02.05 ENCOFRADO PARA FUENTE DE AGUA Y BANCA DB6.1 m2 - 61.97 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00

2.07.02.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg - 5.87 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00

2.07.02.07 CURADO DE CONCRETO EN FUENTE DE AGUA Y BANCA DB6 ###


m2 361.60 2.02 730.43 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 180.80 50.00% 182.61 180.80 50.00% 182.61 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% 0.00

3.00 ARQUITECTURA 2,316,847.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00

03.02. ARQUITECTURA JR LAMPA 664,105.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00

03.02.01 TRABAJOS PRELIMINARES 43,066.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00

03.02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 1,326.35 4.01 5,318.66 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 442.12 33.33% 590.96 442.12 33.33% 590.96 442.12 33.33% 590.96 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00

03.02.01.02 RETIRO DE MOBILIARIOS EXISTENTES 734.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00

03.02.01.02.01 RETIRO DE SEÑALITICA VERTICAL und 1.00 26.70 26.70 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 0.50 50.00% 6.68 0.25 25.00% 1.67 0.25 25.00% 1.67 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00

03.02.01.02.02 RETIRO DE BASUREROS und 3.00 67.63 202.89 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 - 0.00% 0.00 2.00 66.67% 90.17 1.00 33.33% 22.54 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00

03.02.01.02.03 RETIRO DE BOLARDOS und 7.00 45.83 320.81 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 7.00 100.00% 320.81 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00

03.02.01.02.04 RETIRO DE ESTACIONAMIENTO PARA BICICLETAS und 1.00 68.75 68.75 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 0.00% 0.00 1.00 100.00% 68.75 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00

03.02.01.02.05 RETIRO DE REFLECTORES EN EL PISO und - 56.87 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00

03.02.01.02.06 DESMONTAJE DE REJILLAS METALICAS m2 0.98 8.55 8.38 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 0.00% 0.00 0.45 45.92% 1.77 0.53 54.08% 2.45 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00

03.02.01.02.07 TRASALADO DE MOBILIARIO A PUNTO DE ACOPIO ENTRE 120 m Y 1000 m glb 0.20 532.57 106.51 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 0.05 25.00% 6.66 0.05 25.00% 6.66 0.05 25.00% 6.66 0.05 25.00% 6.66 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00

03.02.01.03 DESMONTAJE DE PISOS 28,960.96 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00

03.02.01.03.01 DESMONTAJE DE PISTA DE ADOQUÍN ESPINA DE PEZ m2 - 18.38 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00

03.02.01.03.02 DESMONTAJE DE PISTA DE ADOQUÍN ESPINA DE PEZ DOBLE m2 - 18.38 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00

03.02.01.03.03 DESMONTAJE DE PISTA DE PIEDRA PARTIDA m2 - 22.96 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00

03.02.01.03.04 DESMONTAJE DE VEREDA DE PIEDRA FORMATO 0.40 X 0.40 m2 8.15 18.38 149.80 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 4.07 49.94% 37.36 4.08 50.06% 37.54 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00

03.02.01.03.05 DESMONTAJE DE VEREDA DE PIEDRA PARTIDA m2 81.73 22.96 1,876.52 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 40.86 49.99% 469.02 40.87 50.01% 469.25 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00

03.02.01.03.06 DESMONTAJE DE MARTILLOS DE PIEDRA FORMATO 0.40 X 0.40 m2 52.23 18.38 959.99 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 26.11 26.12 12,535.04 26.12 52.23 25,074.87 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00

03.02.01.03.07 DESMONTAJE DE VEREDA DE ADOQUÍN m2 214.38 18.38 3,940.30 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 71.46 71.46 93,858.05 71.46 71.46 93,858.05 71.46 33.33% 437.81 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00

03.02.01.03.08 DESPONTAJE DE VEREDA DE ADOQUÍN ESPINA DE PEZ DOBLE m2 - 18.38 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00

03.02.01.03.09 DESMONTAJE DE PISO PODODÁCTIL DE ALERTA EXISTENTE m2 - 18.38 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00

03.02.01.03.10 DESMONTAJE DE SARDINEL DE PIEDRA (INCLUIDO DE LOS MARTILLOS) m 249.36 22.16 5,525.82 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 249.36 100.00% 5,525.82 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00

03.02.01.03.11 TRASLADO DE MATERIAL RECUPERADO A PUNTO DE ACOPIO m2 185.51 88.99 16,508.53 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 185.51 100.00% 16,508.53 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00

03.02.01.04 DESMONTAJE DE CAJAS 1,430.12 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00

03.02.01.04.01 DESMONTAJE DE MARCO, TAPA Y CAJA DE REGISTRO DE AGUA DOMICILIARIAS und 20.00 7.42 148.40 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 10.00 50.00% 37.10 10.00 50.00% 37.10 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00

03.02.01.04.02 DESMONTAJE DE MARCO, TAPA Y CAJA DE REGISTRO DE DESAGUE DOMICILIARIAS und 11.00 17.10 188.10 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 11.00 100.00% 188.10 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00

03.02.01.04.03 DESMONTAJE DE TAPA VALVULA HIDRANTES und - 6.09 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00

03.02.01.04.04 DESMONTAJE DE MARCO TAPA METALICA OTROS SERVICIOS (0.20 MX 0.10M - ARCO MEDIO PUNTO) und - 7.10 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00

03.02.01.04.05 DESMONTAJE TAPA DE BUZONES CIRCULARES und 13.00 48.48 630.24 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 5.00 38.46% 93.23 8.00 61.54% 238.67 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00

03.02.01.04.06 DESMONTAJE DE TAPAS DE CONCRETO CUADRADAS O RECTANGULARES und 6.00 9.23 55.38 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 3.00 50.00% 13.85 3.00 50.00% 13.85 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00

03.02.01.04.07 DESMONTAJE DE TAPAS DE POZO A TIERRA und - 7.42 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00

03.02.01.04.08 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 6.40 63.75 408.00 - 0.00 - 0.00 0.00 0.00 - 0.0
7 56