LUGAR : CENTRO HISTORICO DE LIMA, DISTRITO DE LIMA, PROVINCIA DE LIMA -LIMA CONSULTOR DE LA SUPERVISION: DELGADO MONCADA MANUEL ANTONIO
mes 1
MES 01 MES 02 MES 03 MES 04 MES 05
Obra: MEJORAMIENTO Y REDISEÑO DE VIAS DE LOS JIRONES LAMPA (CUADRAS 1, 2, 3, 4, 5), AMAZONAS (CUADRA 1), JUNIN (CUADRA 3,4), ANCASH (CUADRA 3 Y 4), AZANGARO (CUADRAS 1, 2, 3, 4) Y HUALLAGA (CUADRA 3 Y 4)
SEMANA 01 SEMANA 02 SEMANA 03 SEMANA 04 SEMANA 05 SEMANA 06 SEMANA 07 SEMANA 08 SEMANA 09 SEMANA 10 SEMANA 11 SEMANA 12 SEMANA 11 SEMANA 12 SEMANA 13 SEMANA 14 SEMANA 15 SEMANA 16 SEMANA 17 SEMANA 18
ITEM PARTIDA UND. METRADO P.U. SUB TOTAL MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/. MET % S/.
2.07.02.06 ACERO DE REFUERZO fy=4,200 kg/cm2 kg - 5.87 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
3.00 ARQUITECTURA 2,316,847.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
03.02. ARQUITECTURA JR LAMPA 664,105.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
03.02.01 TRABAJOS PRELIMINARES 43,066.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
03.02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 1,326.35 4.01 5,318.66 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 442.12 33.33% 590.96 442.12 33.33% 590.96 442.12 33.33% 590.96 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
03.02.01.02 RETIRO DE MOBILIARIOS EXISTENTES 734.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
03.02.01.02.01 RETIRO DE SEÑALITICA VERTICAL und 1.00 26.70 26.70 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 0.50 50.00% 6.68 0.25 25.00% 1.67 0.25 25.00% 1.67 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
03.02.01.02.02 RETIRO DE BASUREROS und 3.00 67.63 202.89 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 - 0.00% 0.00 2.00 66.67% 90.17 1.00 33.33% 22.54 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
03.02.01.02.03 RETIRO DE BOLARDOS und 7.00 45.83 320.81 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 7.00 100.00% 320.81 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
03.02.01.02.04 RETIRO DE ESTACIONAMIENTO PARA BICICLETAS und 1.00 68.75 68.75 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 0.00% 0.00 1.00 100.00% 68.75 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
03.02.01.02.05 RETIRO DE REFLECTORES EN EL PISO und - 56.87 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
03.02.01.02.06 DESMONTAJE DE REJILLAS METALICAS m2 0.98 8.55 8.38 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 0.00% 0.00 0.45 45.92% 1.77 0.53 54.08% 2.45 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
03.02.01.02.07 TRASALADO DE MOBILIARIO A PUNTO DE ACOPIO ENTRE 120 m Y 1000 m glb 0.20 532.57 106.51 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 0.05 25.00% 6.66 0.05 25.00% 6.66 0.05 25.00% 6.66 0.05 25.00% 6.66 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
03.02.01.03 DESMONTAJE DE PISOS 28,960.96 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
03.02.01.03.01 DESMONTAJE DE PISTA DE ADOQUÍN ESPINA DE PEZ m2 - 18.38 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
03.02.01.03.02 DESMONTAJE DE PISTA DE ADOQUÍN ESPINA DE PEZ DOBLE m2 - 18.38 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
03.02.01.03.03 DESMONTAJE DE PISTA DE PIEDRA PARTIDA m2 - 22.96 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
03.02.01.03.04 DESMONTAJE DE VEREDA DE PIEDRA FORMATO 0.40 X 0.40 m2 8.15 18.38 149.80 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 4.07 49.94% 37.36 4.08 50.06% 37.54 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
03.02.01.03.05 DESMONTAJE DE VEREDA DE PIEDRA PARTIDA m2 81.73 22.96 1,876.52 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 40.86 49.99% 469.02 40.87 50.01% 469.25 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
03.02.01.03.06 DESMONTAJE DE MARTILLOS DE PIEDRA FORMATO 0.40 X 0.40 m2 52.23 18.38 959.99 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 26.11 26.12 12,535.04 26.12 52.23 25,074.87 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
03.02.01.03.07 DESMONTAJE DE VEREDA DE ADOQUÍN m2 214.38 18.38 3,940.30 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 71.46 71.46 93,858.05 71.46 71.46 93,858.05 71.46 33.33% 437.81 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
03.02.01.03.08 DESPONTAJE DE VEREDA DE ADOQUÍN ESPINA DE PEZ DOBLE m2 - 18.38 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
03.02.01.03.09 DESMONTAJE DE PISO PODODÁCTIL DE ALERTA EXISTENTE m2 - 18.38 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
03.02.01.03.10 DESMONTAJE DE SARDINEL DE PIEDRA (INCLUIDO DE LOS MARTILLOS) m 249.36 22.16 5,525.82 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 249.36 100.00% 5,525.82 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
03.02.01.03.11 TRASLADO DE MATERIAL RECUPERADO A PUNTO DE ACOPIO m2 185.51 88.99 16,508.53 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 185.51 100.00% 16,508.53 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
03.02.01.04 DESMONTAJE DE CAJAS 1,430.12 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
03.02.01.04.01 DESMONTAJE DE MARCO, TAPA Y CAJA DE REGISTRO DE AGUA DOMICILIARIAS und 20.00 7.42 148.40 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 10.00 50.00% 37.10 10.00 50.00% 37.10 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
03.02.01.04.02 DESMONTAJE DE MARCO, TAPA Y CAJA DE REGISTRO DE DESAGUE DOMICILIARIAS und 11.00 17.10 188.10 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 11.00 100.00% 188.10 - 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
03.02.01.04.03 DESMONTAJE DE TAPA VALVULA HIDRANTES und - 6.09 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
03.02.01.04.04 DESMONTAJE DE MARCO TAPA METALICA OTROS SERVICIOS (0.20 MX 0.10M - ARCO MEDIO PUNTO) und - 7.10 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
03.02.01.04.05 DESMONTAJE TAPA DE BUZONES CIRCULARES und 13.00 48.48 630.24 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 5.00 38.46% 93.23 8.00 61.54% 238.67 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
03.02.01.04.06 DESMONTAJE DE TAPAS DE CONCRETO CUADRADAS O RECTANGULARES und 6.00 9.23 55.38 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00% 0.00 0.00 0.00 3.00 50.00% 13.85 3.00 50.00% 13.85 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00% ###
0.00
03.02.01.04.07 DESMONTAJE DE TAPAS DE POZO A TIERRA und - 7.42 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00
03.02.01.04.08 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km m3 6.40 63.75 408.00 - 0.00 - 0.00 0.00 0.00 - 0.0
7 56
2 11
1 5
perfil 8