OBRA: CONSTRUCCIÓN DE INFRAESTRUCTURA I.E N° 16682 AGUAS TURBIAS DISTRITO CAJARURO, PROVINCIA UTCUBAMBA-AMAZONAS.
DIMENSIONES
ITEM DESCRIPCION UND. METRADO N° VECES LARGO ANCHO ALTO PARCIAL
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.02 EXCAVACIONES SIMPLES
02.01.02.01 EXCAVACION DE ZANJAS, ZAPATAS Y VIGAS DE CIMENTACION Hmax=1.80M. M3 83.23
EJES HORIZONTALES:
ENTRE EJE 1
EJE A-B 1.00 1.10 1.30 1.80 2.57
CORTE A-A 1.00 2.32 0.30 1.00 0.70
EJE B-C 1.00 1.10 1.30 1.80 2.57
CORTE A-A 1.00 2.32 0.30 1.00 0.70
EJE C-D 1.00 1.10 1.30 1.80 2.57
CORTE A-A 1.00 1.00 0.30 1.00 0.30
EJE D-E 1.00 1.10 1.30 1.80 2.57
CORTE A-A 1.00 1.00 0.30 1.00 0.30
EJE E-F 1.00 1.10 1.30 1.80 2.57
CORTE A-A 1.00 2.32 0.30 1.00 0.70
EJE F-G 1.00 1.10 1.30 1.80 2.57
CORTE A-A 1.00 2.32 0.30 1.00 0.70
EJE G 1.00 1.10 1.30 1.80 2.57
ENTRE EJE 2
EJE D-E 1.00 1.15 1.20 1.80 2.48
CORTE F-F 1.00 0.82 0.50 0.80 0.33
ENTRE EJE 3
EJE A-B 1.00 1.30 1.50 1.80 3.51
CORTE A-A 1.00 2.12 0.30 1.00 0.64
EJE B-C 1.00 1.30 1.50 1.80 3.51
CORTE A-A 1.00 2.12 0.30 1.00 0.64
EJE C-D 1.00 1.30 1.50 1.80 3.51
CORTE A-A 1.00 0.80 0.30 1.00 0.24
EJE D-E 1.00 1.30 1.50 1.80 3.51
CORTE A-A 1.00 0.80 0.30 1.00 0.24
EJE E-F 1.00 1.30 1.50 1.80 3.51
CORTE A-A 1.00 2.12 0.30 1.00 0.64
EJE F-G 1.00 1.30 1.50 1.80 3.51
CORTE A-A 1.00 2.12 0.30 1.00 0.64
EJE G 1.00 1.30 1.50 1.80 3.51
EJES VERTICALES:
ENTRE EJE A,G
EJE 1-3 (CORTE B-B) 2.00 4.60 0.80 1.80 13.25
ENTRE EJE B,F
EJE 1-3 (CORTE C-C) 2.00 4.60 0.30 1.00 2.76
ENTRE EJE D
EJE 1-2 (CORTE E-E) 1.00 1.78 0.30 1.00 0.53
EJE 2-3 (CORTE E-E) 1.00 1.67 0.30 1.00 0.50
02.01.03 RELLENOS
02.01.03.01 RELLENO CON MATERIAL PROPIO
02.01.03.01.01 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 41.04
EJES HORIZONTALES:
ENTRE EJE 1
EJE A-B 1.00 A= 1.31 1.00 1.31
CORTE A-A 1.00 2.32 0.15 0.75 0.26
EJE B-C 1.00 A= 1.27 1.00 1.27
CORTE A-A 1.00 2.32 0.15 0.75 0.26
EJE C-D 1.00 A= 1.31 1.00 1.31
CORTE A-A 1.00 1.00 0.15 0.75 0.11
EJE D-E 1.00 A= 1.31 1.00 1.31
CORTE A-A 1.00 1.00 0.15 0.75 0.11
EJE E-F 1.00 A= 1.31 1.00 1.31
CORTE A-A 1.00 2.32 0.15 0.75 0.26
EJE F-G 1.00 A= 1.27 1.00 1.27
CORTE A-A 1.00 2.32 0.15 0.75 0.26
EJE G 1.00 A= 1.31 1.00 1.31
ENTRE EJE 2
EJE D-E 1.00 A= 1.32 1.00 1.32
CORTE F-F 1.00 0.82 0.35 0.45 0.13
DIMENSIONES
ITEM DESCRIPCION UND. METRADO N° VECES LARGO ANCHO ALTO PARCIAL
EJE C-D (CORTE F-F) 1.00 1.75 0.35 0.45 0.28
EJE D-E (CORTE F-F) 1.00 1.08 0.35 0.45 0.17
ENTRE EJE 3
EJE A-B 1.00 A= 1.83 1.00 1.83
CORTE A-A 1.00 2.12 0.15 0.75 0.24
EJE B-C 1.00 A= 1.79 1.00 1.79
CORTE A-A 1.00 2.12 0.15 0.75 0.24
EJE C-D 1.00 A= 1.83 1.00 1.83
CORTE A-A 1.00 0.80 0.15 0.75 0.09
EJE D-E 1.00 A= 1.83 1.00 1.83
CORTE A-A 1.00 0.80 0.15 0.75 0.09
EJE E-F 1.00 A= 1.83 1.00 1.83
CORTE A-A 1.00 2.12 0.15 0.75 0.24
EJE F-G 1.00 A= 1.79 1.00 1.79
CORTE A-A 1.00 2.12 0.15 0.75 0.24
EJE G 1.00 A= 1.83 1.00 1.83
EJES VERTICALES:
ENTRE EJE A,G
EJE 1-3 (CORTE B-B) 2.00 4.60 0.55 1.25 6.32
ENTRE EJE B,F
EJE 1-3 (CORTE C-C) 2.00 4.60 0.30 0.75 2.07
ENTRE EJE D
EJE 1-2 (CORTE E-E) 1.00 1.78 0.30 0.25 0.13
EJE 2-3 (CORTE E-E) 1.00 1.67 0.30 0.25 0.13
EJES HORIZONTALES:
ENTRE EJE 1
Z1 7.00 1.30 1.10 0.20 2.00
ENTRE EJE 2
Z2 1.00 1.20 1.15 0.20 0.28
ENTRE EJE 3
Z3 7.00 1.50 1.30 0.20 2.73
EJES VERTICALES:
ENTRE EJE A,C,E,G
CORTE B-B / CORTE D-D 4.00 4.60 0.55 0.20 2.02
02.02.02 SOLADOS
02.02.02.01 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON M2 41.59
Z1 7.00 1.30 1.10 10.01
Z2 1.00 1.20 1.15 1.38
Z3 7.00 1.50 1.30 13.65
CORTE F-F 1.00 3.65 0.50 1.83
CORTE B-B 2.00 4.60 0.80 7.36
CORTE D-D 2.00 4.60 0.80 7.36
02.02.04 VEREDAS
02.02.04.01 CORTE DE TERRENO NATURAL H=0.40m m3 32.26
A= 80.65 H= 0.40 32.26
DIMENSIONES
ITEM DESCRIPCION UND. METRADO N° VECES LARGO ANCHO ALTO PARCIAL
A= 80.65 H= 0.10 8.07
02.03.01.02 ACERO f'y= 4200 KG/CM2 KG 635.35 N°ELEMENT N° PIEZAS LONGITUD D. LINEAL
Z-01
As. Inf. Longitudinal 1/2'' 7.00 8.00 1.46 0.99 80.94
As. Inf. Transversal 1/2'' 7.00 9.00 1.26 0.99 78.59
Z-02
As. Inf. Longitudinal 1/2'' 1.00 8.00 1.36 0.99 10.77
As. Inf. Transversal 1/2'' 1.00 9.00 1.31 0.99 11.67
Z-03
As. Inf. Longitudinal 1/2'' 7.00 9.00 1.66 0.99 103.53
As. Inf. Transversal 1/2'' 7.00 11.00 1.46 0.99 111.30
CORTE B-B
As. Inf. Longitudinal 1/2'' 2.00 33.00 0.96 0.99 62.73
As. Inf. Transversal 1/2'' 2.00 6.00 4.76 0.99 56.55
CORTE D-D
As. Inf. Longitudinal 1/2'' 2.00 33.00 0.96 0.99 62.73
As. Inf. Transversal 1/2'' 2.00 6.00 4.76 0.99 56.55
02.03.02.03 ACERO f'y= 4200 KG/CM2 KG 1,169.51 N°ELEMENT N° PIEZAS LONGITUD D. LINEAL
EJES HORIZONTALES
DEL EJE 1,3:
EJE A-B / F-G
As. Superior 5/8'' 4.00 3.00 3.85 1.55 71.61
As. Inferior 5/8'' 4.00 3.00 3.85 1.55 71.61
Estribos 3/8'' 4.00 29.00 1.34 0.56 87.05
EJE B-C / E-F
As. Superior 5/8'' 4.00 3.00 3.72 1.55 69.19
As. Inferior 5/8'' 4.00 3.00 3.72 1.55 69.19
Estribos 3/8'' 4.00 29.00 1.34 0.56 87.05
EJE C-D / D-E
As. Superior 5/8'' 4.00 3.00 2.40 1.55 44.64
As. Inferior 5/8'' 4.00 3.00 2.40 1.55 44.64
Estribos 3/8'' 4.00 21.00 1.34 0.56 63.03
EJES VERTICALES
EN EL EJE A,C,D,E,G
EJE 1-3
As. Superior 5/8'' 5.00 3.00 6.40 1.55 148.80
As. Inferior 5/8'' 5.00 3.00 6.40 1.55 148.80
Estribos 3/8'' 5.00 24.00 1.24 0.56 83.33
EN EL EJE B,F
EJE 1-3
As. Superior 5/8'' 2.00 3.00 6.40 1.55 59.52
As. Inferior 5/8'' 2.00 3.00 6.40 1.55 59.52
Estribos 3/8'' 2.00 41.00 1.34 0.56 61.53
DIMENSIONES
ITEM DESCRIPCION UND. METRADO N° VECES LARGO ANCHO ALTO PARCIAL
EJE F-G 2.00 3.37 0.15 1.05 1.06
EN EL EJE 2 Y 2"
EJE C-E 1.00 3.65 0.15 0.75 0.41
EJES VERTICALES
EN EL EJE A,C,E,G
EJE 1-3 4.00 5.00 0.25 1.55 7.75
EN EL EJE D
EJE 1-3 1.00 4.85 0.25 1.05 1.27
EJES VERTICALES
EN EL EJE A,C,E,G
EJE 1-3 8.00 5.00 1.55 62.00
EN EL EJE D
EJE 1-3 6.00 4.85 1.05 30.56
02.03.03.03 ACERO CORRUGADO FY=4200KG/CM2 GRADO 60 EN SOBRECIMIENTOS KG 1,529.98 N°ELEMENT N° PIEZAS LONGITUD D. LINEAL
EJES HORIZONTALES
EN EL EJE 1,3
TRAMO A-B / B-C / E-F / F-G
As. Horizontal 3/8'' 6.00 4.00 18.00 0.56 432.00
As. vertical 3/8'' 6.00 66.00 1.37 0.56 542.52
TRAMO C-D / D-E
As. Horizontal 3/8'' 4.00 4.00 7.20 0.56 115.20
As. vertical 3/8'' 4.00 25.00 1.37 0.56 137.00
EJE 3- TRAMO AB/FG
As. Horizontal 3/8'' 2.00 4.00 4.06 0.56 32.48
As. vertical 3/8'' 2.00 14.00 1.37 0.56 38.36
EN EL EJE 2 Y 2"
TRAMO C-E
As. Horizontal 3/8'' 1.00 3.00 3.86 0.56 11.58
As. vertical 3/8'' 1.00 12.00 1.37 0.56 16.44
EJES VERTICALES
EN EL EJE A,C,E,G
EJE 1-3
As. Horizontal 3/8'' 4.00 8.00 22.08 0.56 17.92
As. vertical 3/8'' 4.00 79.00 2.90 0.56 176.96
EN EL EJE D
EJE 1-3
As. Horizontal 3/8'' 1.00 8.00 2.61 0.56 4.48
As. vertical 3/8'' 1.00 9.00 2.90 0.56 5.04
02.03.04 COLUMNAS
02.03.04.01 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS M3 9.57
C-1 10.00 A= 0.13 3.25 4.06
C-2 4.00 A= 0.16 3.25 2.08
C-3 5.00 A= 0.08 3.25 1.30
CL 28.00 A= 0.03 2.10 1.76
CA 3.00 A= 0.04 3.25 0.37
02.03.04.03 ACERO f'y= 4200 KG/CM2 KG 2,453.90 N°ELEMENT N° PIEZAS LONGITUD D. LINEAL
C-1
As. Longitudinal 5/8'' 10.00 4.00 5.54 1.55 343.48
Estribos 3/8'' 10.00 36.00 1.46 0.56 294.34
As. Longitudinal 1/2'' 10.00 4.00 5.54 0.99 219.38
Estribos 3/8'' 10.00 36.00 0.90 0.56 181.44
C-2
As. Longitudinal 5/8'' 4.00 10.00 5.54 1.55 343.48
Estribos 3/8'' 4.00 72.00 1.40 0.56 225.79
C-3
As. Longitudinal 5/8'' 5.00 6.00 5.54 1.55 257.61
Estribos 3/8'' 5.00 72.00 0.80 0.56 161.28
CL
As. Longitudinal 3/8'' 28.00 4.00 3.79 0.56 237.71
Estribos 8mm 28.00 17.00 0.60 0.40 112.81
CA
As. Longitudinal 3/8'' 3.00 6.00 5.54 0.56 55.84
Estribos 8mm 3.00 25.00 0.70 0.40 20.74
02.03.05 VIGAS
02.03.05.01 CONCRETO F'C=210 KG/CM2. PARA VIGAS M3 8.17
EJES HORIZONTALES
EJE 1-3
TRAMO A-B / B-C / E-F / F-G 8.00 3.25 0.25 0.45 2.93
TRAMO C-D / D-E 4.00 2.05 0.25 0.45 0.92
EJES VERTICALES
EJE A,C,D,E,G
PLANILLA DE METRADOS - ESTRUCTURAS - AGUAS TURBIAS
OBRA: CONSTRUCCIÓN DE INFRAESTRUCTURA I.E N° 16682 AGUAS TURBIAS DISTRITO CAJARURO, PROVINCIA UTCUBAMBA-AMAZONAS.
DIMENSIONES
ITEM DESCRIPCION UND. METRADO N° VECES LARGO ANCHO ALTO PARCIAL
TRAMO 1-3 5.00 5.00 0.25 0.45 2.81
EJE B,F
TRAMO 1-3 2.00 5.50 0.25 0.55 1.51
EJES VERTICALES
EJE A,C,D,E,G
TRAMO 1-3 10.00 5.00 0.45 22.50
EJE B,F
TRAMO 1-3 4.00 5.50 0.55 12.10
02.03.05.03 ACERO f'y= 4200 KG/CM2 KG 1,002.65 N°ELEMENT N° PIEZAS LONGITUD D. LINEAL
EJES HORIZONTALES
EJE 1-3
TRAMO A-B / F-G
As. Longitudinal 5/8'' 4.00 4.00 4.24 1.55 105.15
Estribos 3/8'' 4.00 27.00 1.30 0.56 78.62
EJES VERTICALES
EJE A,C,D,E,G
TRAMO 1-3
As. Longitudinal 5/8'' 10.00 4.00 3.49 1.55 216.38
Estribos 3/8'' 10.00 22.00 1.34 0.56 165.09
EJE B,F
TRAMO 1-3
As. Longitudinal 5/8'' 2.00 4.00 6.79 1.55 84.20
Estribos 3/8'' 2.00 42.00 1.54 0.56 72.44
02.05 COBERTURAS
02.05.01 TEJA DE CEMENTO COLOREADA m² 258.02
Módulo 1 A= 215.50 A= 0.84 258.02
PLANILLA DE METRADOS - ESTRUCTURAS - AGUAS TURBIAS
OBRA: CONSTRUCCIÓN DE INFRAESTRUCTURA I.E N° 16682 AGUAS TURBIAS DISTRITO CAJARURO, PROVINCIA UTCUBAMBA-AMAZONAS.
DIMENSIONES
ITEM DESCRIPCION UND. METRADON° VECES LARGO ANCHO ALTO PARCIAL
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.02 EXCAVACIONES SIMPLES
02.01.02.01 EXCAVACION DE ZANJAS, ZAPATAS Y VIGAS DE CIMENTACION Hmax=1.80M. M3 46.82
EJES HORIZONTALES:
ENTRE EJE 1
EJE C-D 1.00 1.20 1.40 1.80 3.02
CORTE A-A 1.00 1.72 0.30 1.00 0.52
EJE D-E 1.00 1.20 1.40 1.80 3.02
CORTE A-A 1.00 1.72 0.30 1.00 0.52
EJE E-F 1.00 1.20 1.40 1.80 3.02
CORTE A-A 1.00 1.60 0.30 1.00 0.48
EJE F 1.00 1.20 1.40 1.80 3.02
ENTRE EJE 3
EJE B-C 1.00 1.20 1.60 1.80 3.46
CORTE A-A 1.00 1.40 0.30 1.00 0.42
EJE C-D 1.00 1.20 1.60 1.80 3.46
CORTE A-A 1.00 1.52 0.30 1.00 0.46
EJE D-E 1.00 1.20 1.60 1.80 3.46
CORTE A-A 1.00 1.52 0.30 1.00 0.46
EJE E-F 1.00 1.20 1.60 1.80 3.46
CORTE A-A 1.00 1.40 0.30 1.00 0.42
EJE F 1.00 1.20 1.60 1.80 3.46
EJES VERTICALES:
ENTRE EJE B,F
EJE 1-3 (CORTE D-D) 2.00 3.75 0.80 1.80 10.80
02.01.03 RELLENOS
02.01.03.01 RELLENO CON MATERIAL PROPIO
02.01.03.01.01 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 25.62
EJES HORIZONTALES:
ENTRE EJE 1
EJE B-C 1.00 A= 1.56 1.00 1.56
CORTE A-A 1.00 1.60 0.15 0.75 0.18
EJE C-D 1.00 A= 1.52 1.00 1.52
CORTE A-A 1.00 1.72 0.15 0.75 0.19
EJE D-E 1.00 A= 1.52 1.00 1.52
CORTE A-A 1.00 1.72 0.15 0.75 0.19
EJE E-F 1.00 A= 1.52 1.00 1.52
CORTE A-A 1.00 1.60 0.15 0.75 0.18
EJE F 1.00 A= 1.56 1.00 1.56
ENTRE EJE 3
EJE B-C 1.00 A= 1.80 1.00 1.80
CORTE A-A 1.00 1.40 0.15 0.75 0.16
EJE C-D 1.00 A= 1.76 1.00 1.76
CORTE A-A 1.00 1.52 0.15 0.75 0.17
EJE D-E 1.00 A= 1.76 1.00 1.76
CORTE A-A 1.00 1.52 0.15 0.75 0.17
EJE E-F 1.00 A= 1.76 1.00 1.76
CORTE A-A 1.00 1.40 0.15 0.75 0.16
EJE F 1.00 A= 1.80 1.00 1.80
EJES VERTICALES:
ENTRE EJE B,F
EJE 1-3 (CORTE D-D) 2.00 3.75 0.55 1.25 5.16
EJES HORIZONTALES:
ENTRE EJE 1
Z1 5.00 1.40 1.20 0.20 1.68
ENTRE EJE 2
Z2 5.00 1.60 1.20 0.20 1.92
EJES VERTICALES:
ENTRE EJE A,B,F,G
CORTE B-B / CORTE D-D 4.00 3.75 0.55 0.20 1.65
OBRA: CONSTRUCCIÓN DE INFRAESTRUCTURA I.E N° 16682 AGUAS TURBIAS DISTRITO CAJARURO, PROVINCIA UTCUBAMBA-AMAZONAS.
DIMENSIONES
ITEM DESCRIPCION UND. METRADON° VECES LARGO ANCHO ALTO PARCIAL
02.02 OBRAS DE CONCRETO SIMPLE
02.02.02 SOLADOS
02.02.02.01 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON M2 24.00
Z1 5.00 1.20 1.40 8.40
Z2 5.00 1.20 1.60 9.60
CORTE D-D 2.00 3.75 0.80 6.00
02.02.04 VEREDAS
02.02.04.01 CORTE DE TERRENO NATURAL H=0.40m m3 18.56
A= 46.40 H= 0.40 18.56
02.03.01.02 ACERO f'y= 4200 KG/CM2 KG 420.51 N°ELEMENN° PIEZAS LONGITUD D. LINEAL
Z-01
As. Inf. Longitudinal 1/2'' 5.00 10.00 1.56 0.99 77.22
As. Inf. Transversal 1/2'' 5.00 11.00 1.76 0.99 95.83
Z-02
As. Inf. Longitudinal 1/2'' 5.00 11.00 1.76 0.99 95.83
As. Inf. Transversal 1/2'' 5.00 8.00 1.36 0.99 53.86
CORTE D-D
As. Inf. Longitudinal 1/2'' 2.00 27.00 0.96 0.99 51.32
As. Inf. Transversal 1/2'' 2.00 6.00 3.91 0.99 46.45
EJES VERTICALES
EN EL EJE B,F
EJE 1-3 2.00 4.50 0.25 1.55 3.49
02.03.02.03 ACERO f'y= 4200 KG/CM2 KG 807.22 N°ELEMENN° PIEZAS LONGITUD D. LINEAL
EJES HORIZONTALES
DEL EJE 1,3:
EJE B-C / C-D / D-E/ E-F
As. Superior 5/8'' 8.00 3.00 3.10 1.55 115.32
As. Inferior 5/8'' 8.00 3.00 3.10 1.55 115.32
Estribos 3/8'' 8.00 24.00 1.34 0.56 144.08
EJES VERTICALES
EN EL EJE B,F
EJE 1-2
As. Superior 5/8'' 2.00 2.00 2.40 1.55 14.88
As. Inferior 5/8'' 2.00 2.00 2.40 1.55 14.88
Estribos 3/8'' 2.00 16.00 1.24 0.56 22.22
EJE 2-3
As. Superior 5/8'' 4.00 2.00 5.55 1.55 68.82
As. Inferior 5/8'' 4.00 2.00 5.55 1.55 68.82
Estribos 3/8'' 4.00 24.00 1.24 0.56 66.66
EN EL EJE C,D,E
EJE 1-3
As. Superior 5/8'' 3.00 3.00 3.25 1.55 45.34
As. Inferior 5/8'' 3.00 3.00 3.25 1.55 45.34
PLANILLA DE METRADOS - ESTRUCTURAS - AGUAS TURBIAS
OBRA: CONSTRUCCIÓN DE INFRAESTRUCTURA I.E N° 16682 AGUAS TURBIAS DISTRITO CAJARURO, PROVINCIA UTCUBAMBA-AMAZONAS.
DIMENSIONES
ITEM DESCRIPCION UND. METRADON° VECES LARGO ANCHO ALTO PARCIAL
Estribos 3/8'' 3.00 38.00 1.34 0.56 85.55
EJES VERTICALES
EN EL EJE B,F
EJE 1-3 2.00 4.15 0.25 1.55 3.22
EJES VERTICALES
EN EL EJE B,F
EJE 1-3 4.00 4.15 1.55 25.73
02.03.03.03 ACERO CORRUGADO FY=4200KG/CM2 GRADO 60 EN SOBRECIMIENTOS KG 137.84 N°ELEMENN° PIEZAS LONGITUD D. LINEAL
EJES HORIZONTALES:
ENTRE EL EJE 1
EJE B-C /C-D / D-E / E-F
As. Horizontal 3/8'' 1.00 4.00 9.48 0.56 21.24
As. vertical 3/8'' 1.00 34.00 1.37 0.56 26.08
EJES VERTICALES:
ENTRE EL EJE B
EJE1-3
As. Horizontal 3/8'' 1.00 8.00 4.58 0.56 20.52
As. vertical 3/8'' 1.00 14.00 2.90 0.56 22.74
ENTRE EL EJE F
EJE1-3
As. Horizontal 3/8'' 1.00 8.00 4.75 0.56 21.28
As. vertical 3/8'' 1.00 16.00 2.90 0.56 25.98
02.03.04 COLUMNAS
02.03.04.01 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS M3 6.40
C-1 4.00 A= 0.13 3.25 1.63
C-2 6.00 A= 0.16 3.25 3.12
C-3 2.00 A= 0.08 3.25 0.52
CL 18.00 A= 0.03 2.10 1.13
02.03.04.03 ACERO f'y= 4200 KG/CM2 KG 1,669.51 N°ELEMENN° PIEZAS LONGITUD D. LINEAL
C-1
As. Longitudinal 5/8'' 4.00 4.00 5.54 1.55 137.39
Estribos 3/8'' 4.00 36.00 1.46 0.56 117.73
As. Longitudinal 1/2'' 4.00 4.00 5.54 0.99 87.75
Estribos 3/8'' 4.00 36.00 0.90 0.56 72.58
C-2
As. Longitudinal 5/8'' 6.00 10.00 5.54 1.55 515.22
Estribos 3/8'' 6.00 72.00 1.40 0.56 338.69
C-3
As. Longitudinal 5/8'' 2.00 6.00 5.54 1.55 103.04
Estribos 3/8'' 2.00 72.00 0.80 0.56 64.51
CL
As. Longitudinal 3/8'' 18.00 4.00 3.79 0.56 152.81
Estribos 8mm 18.00 17.00 0.66 0.40 79.77
02.03.05 VIGAS
02.03.05.01 CONCRETO F'C=210 KG/CM2. PARA VIGAS M3 5.21
EJES HORIZONTALES
EJE 1-3
TRAMO B-C / C-D / D-E / E-F 8.00 2.62 0.25 0.45 2.36
EJES VERTICALES
EJE B,F
TRAMO 1-3 2.00 4.15 0.25 0.45 0.93
EJE C,D,E
TRAMO 1-3 3.00 4.65 0.25 0.55 1.92
EJES VERTICALES
EJE B,F
TRAMO 1-3 4.00 4.15 0.45 7.47
EJE C,D,E
TRAMO 1-3 6.00 4.65 0.55 15.35
02.03.05.03 ACERO f'y= 4200 KG/CM2 KG 519.69 N°ELEMENN° PIEZAS LONGITUD D. LINEAL
EJES HORIZONTALES
PLANILLA DE METRADOS - ESTRUCTURAS - AGUAS TURBIAS
OBRA: CONSTRUCCIÓN DE INFRAESTRUCTURA I.E N° 16682 AGUAS TURBIAS DISTRITO CAJARURO, PROVINCIA UTCUBAMBA-AMAZONAS.
DIMENSIONES
ITEM DESCRIPCION UND. METRADON° VECES LARGO ANCHO ALTO PARCIAL
EJE 1-3
TRAMO B-C / C-D / D-E / E-F
As. Longitudinal 5/8'' 8.00 4.00 3.01 1.55 149.30
Estribos 3/8'' 8.00 23.00 1.34 0.56 138.07
EJES VERTICALES
EJE B,F
TRAMO 1-3
As. Longitudinal 5/8'' 2.00 4.00 5.14 1.55 63.74
Estribos 3/8'' 2.00 33.00 1.34 0.56 49.53
EJE C,D,E
TRAMO 1-3
As. Longitudinal 5/8'' 2.00 3.00 5.94 1.55 55.24
Estribos 3/8'' 2.00 37.00 1.54 0.56 63.82
02.05 COBERTURAS
DIMENSIONES
ITEM DESCRIPCION UND. METRADO N° VECES LARGO ANCHO ALTO PARCIAL
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.02 EXCAVACIONES SIMPLES
02.01.02.01 EXCAVACION DE ZANJAS, ZAPATAS Y VIGAS DE CIMENTACION Hmax=1.80M. M3 36.42
EJES HORIZONTALES:
ENTRE EJE 1
EJE A-B 1.00 1.00 1.20 1.80 2.16
CORTE A-A 1.00 2.15 0.30 1.00 0.64
EJE B-C 1.00 1.00 1.20 1.80 2.16
CORTE A-A 1.00 2.25 0.30 1.00 0.67
EJE C-D 1.00 1.00 1.20 1.80 2.16
CORTE A-A 1.00 2.20 0.30 1.00 0.66
EJE D 1.00 1.00 1.20 1.80 2.16
ENTRE EJE 2
EJE A-B 1.00 1.10 1.40 1.80 2.77
CORTE A-A 1.00 1.95 0.30 1.00 0.59
EJE B-C 1.00 1.10 1.40 1.80 2.77
CORTE A-A 1.00 2.05 0.30 1.00 0.61
EJE C-D 1.00 1.10 1.40 1.80 2.77
CORTE A-A 1.00 2.00 0.30 1.00 0.60
EJE D 1.00 1.10 1.40 1.80 2.77
EJES VERTICALES:
ENTRE EJE A,D
EJE 1-2 (CORTE B-B) 2.00 3.75 0.80 1.00 6.00
02.01.03 RELLENOS
02.01.03.01 RELLENO CON MATERIAL PROPIO
02.01.03.01.01 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 22.05
ENTRE EJE 1
EJE A-B 1.00 A= 1.08 1.00 1.08
CORTE A-A 1.00 2.15 0.15 0.75 0.24
EJE B-C 1.00 A= 1.08 1.00 1.08
CORTE A-A 1.00 2.25 0.15 0.75 0.25
EJE C-D 1.00 A= 1.08 1.00 1.08
CORTE A-A 1.00 2.20 0.15 0.75 0.25
EJE D 1.00 A= 1.08 1.00 1.08
ENTRE EJE 2
EJE A-B 1.00 A= 1.42 1.00 1.42
CORTE A-A 1.00 1.95 0.15 0.75 0.22
EJE B-C 1.00 A= 1.42 1.00 1.42
CORTE A-A 1.00 2.05 0.15 0.75 0.23
EJE C-D 1.00 A= 1.42 1.00 1.42
CORTE A-A 1.00 2.00 0.15 0.75 0.22
EJE D 1.00 A= 1.42 1.00 1.42
EJES VERTICALES:
ENTRE EJE A,D
EJE 1-2 (CORTE B-B) 2.00 3.75 0.55 1.25 5.16
EJES HORIZONTALES:
ENTRE EJE 1
Z1 4.00 1.20 1.00 0.20 0.96
ENTRE EJE 2
PLANILLA DE METRADOS - ESTRUCTURAS - AGUAS TURBIAS
OBRA: CONSTRUCCIÓN DE INFRAESTRUCTURA I.E N° 16682 AGUAS TURBIAS DISTRITO CAJARURO, PROVINCIA UTCUBAMBA-AMAZONAS.
DIMENSIONES
ITEM DESCRIPCION UND. METRADO N° VECES LARGO ANCHO ALTO PARCIAL
Z2 4.00 1.40 1.10 0.20 1.23
EJES VERTICALES:
ENTRE EJE A,B,C,D
CORTE B-B / CORTE C-C 4.00 3.75 0.55 0.20 1.65
02.02.02 SOLADOS
02.02.02.01 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON M2 24.10
Z1 4.00 1.00 1.20 4.80
Z2 4.00 1.10 1.40 6.16
CORTE D-D 1.00 2.27 0.50 1.14
CORTE B-B 2.00 3.75 0.80 6.00
CORTE C-C 2.00 3.75 0.80 6.00
02.02.04 VEREDAS
02.02.04.01 CORTE DE TERRENO NATURAL H=0.40m m3 19.64
A= 49.10 H= 0.40 19.64
02.03.01.02 ACERO f'y= 4200 KG/CM2 KG 366.30 N°ELEMENN° PIEZAS LONGITUD D. LINEAL
Z-01
As. Inf. Longitudinal 1/2'' 4.00 8.00 1.36 0.99 43.08
As. Inf. Transversal 1/2'' 4.00 7.00 1.16 0.99 32.16
Z-02
As. Inf. Longitudinal 1/2'' 4.00 9.00 1.56 0.99 55.60
As. Inf. Transversal 1/2'' 4.00 8.00 1.26 0.99 39.92
CORTE B-B
As. Inf. Longitudinal 1/2'' 2.00 27.00 0.96 0.99 51.32
As. Inf. Transversal 1/2'' 2.00 6.00 3.91 0.99 46.45
CORTE C-C
As. Inf. Longitudinal 1/2'' 2.00 27.00 0.96 0.99 51.32
As. Inf. Transversal 1/2'' 2.00 6.00 3.91 0.99 46.45
DIMENSIONES
ITEM DESCRIPCION UND. METRADO N° VECES LARGO ANCHO ALTO PARCIAL
EJE A-B 2.00 3.10 0.30 0.50 0.93
EJE B-C 2.00 3.20 0.30 0.50 0.96
EJEC-D 2.00 3.15 0.30 0.50 0.95
02.03.02.03 ACERO f'y= 4200 KG/CM2 KG 535.32 N°ELEMENN° PIEZAS LONGITUD D. LINEAL
ENTRE EJE 01
EJE A-B
As. Superior 5/8'' 1.00 3.00 3.58 1.55 16.65
As. Inferior 5/8'' 1.00 3.00 3.58 1.55 16.65
Estribos 3/8'' 1.00 28.00 1.34 0.56 21.01
EJE B-C
As. Superior 5/8'' 1.00 3.00 3.55 1.55 16.51
As. Inferior 5/8'' 1.00 3.00 3.55 1.55 16.51
Estribos 3/8'' 1.00 28.00 1.34 0.56 21.01
EJE C-D
As. Superior 5/8'' 1.00 3.00 3.63 1.55 16.88
As. Inferior 5/8'' 1.00 3.00 3.63 1.55 16.88
Estribos 3/8'' 1.00 28.00 1.34 0.56 21.01
ENTRE EJE 02
EJE A-B
As. Superior 5/8'' 1.00 3.00 3.58 1.55 16.65
As. Inferior 5/8'' 1.00 3.00 3.58 1.55 16.65
Estribos 3/8'' 1.00 28.00 1.34 0.56 21.01
EJE B-C
As. Superior 5/8'' 1.00 3.00 3.55 1.55 16.51
As. Inferior 5/8'' 1.00 3.00 3.55 1.55 16.51
Estribos 3/8'' 1.00 28.00 1.34 0.56 21.01
EJEC-D
As. Superior 5/8'' 1.00 3.00 3.63 1.55 16.88
As. Inferior 5/8'' 1.00 3.00 3.63 1.55 16.88
Estribos 3/8'' 1.00 28.00 1.34 0.56 21.01
EN EL EJE 1"
EJE C-D 1.00 2.55 0.15 0.75 0.29
EJES VERTICALES
EN EL EJE A,B,C,D
EJE 1-2 4.00 4.30 0.25 1.55 6.67
EN EL EJE 1"
EJE C-D 2.00 2.55 0.75 3.82
EJES VERTICALES
EN EL EJE A,B,C,D 8.00 4.30 1.55 53.32
EJE 1-2
02.03.03.03 ACERO CORRUGADO FY=4200KG/CM2 GRADO 60 EN SOBRECIMIENTOS KG 868.45 N°ELEMENN° PIEZAS LONGITUD D. LINEAL
EJES HORIZONTALES:
ENTRE EL EJE 1
EJE A-B
As. Horizontal 3/8'' 1.00 4.00 8.70 0.56 19.49
As. vertical 3/8'' 1.00 31.00 1.35 0.56 23.44
ENTRE EL EJE 2
EJE A-B
As. Horizontal 3/8'' 1.00 4.00 6.36 0.56 14.25
As. vertical 3/8'' 1.00 22.00 1.35 0.56 16.63
ENTRE EL EJE 1"
EJE C-D ( CORTE D-D)
As. Horizontal 3/8'' 1.00 3.00 2.12 0.56 3.56
As. vertical 3/8'' 1.00 7.00 1.35 0.56 5.29
PLANILLA DE METRADOS - ESTRUCTURAS - AGUAS TURBIAS
OBRA: CONSTRUCCIÓN DE INFRAESTRUCTURA I.E N° 16682 AGUAS TURBIAS DISTRITO CAJARURO, PROVINCIA UTCUBAMBA-AMAZONAS.
DIMENSIONES
ITEM DESCRIPCION UND. METRADO N° VECES LARGO ANCHO ALTO PARCIAL
EJES VERTICALES:
ENTRE EL EJE A,B,C,D
EJE1-2
As. Horizontal 3/8'' 4.00 8.00 19.20 0.56 344.06
As. vertical 3/8'' 4.00 68.00 2.90 0.56 441.73
02.03.04 COLUMNAS
02.03.04.01 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS M3 4.13
C-01 8.00 A= 0.13 3.25 3.25
CL 14.00 A= 0.03 2.10 0.88
02.03.04.03 ACERO f'y= 4200 KG/CM2 KG 512.64 N°ELEMENN° PIEZAS LONGITUD D. LINEAL
C-01
As. Longitudinal 5/8'' 8.00 4.00 5.54 1.55 274.78
Estribos 3/8'' 8.00 36.00 1.46 0.56 6.54
As. Longitudinal 1/2'' 8.00 4.00 5.54 0.99 43.88
Estribos 3/8'' 8.00 36.00 1.46 0.56 6.54
CL
As. Longitudinal 3/8'' 14.00 4.00 3.79 0.56 118.85
Estribos 8mm 14.00 17.00 0.66 0.40 62.05
02.03.05 VIGAS
02.03.05.01 CONCRETO F'C=210 KG/CM2. PARA VIGAS M3 4.06
EJES HORIZONTALES
EJE 1-2
TRAMO A-B 2.00 3.10 0.25 0.45 0.70
TRAMO B-C 2.00 3.20 0.25 0.45 0.72
TRAMO C-D 2.00 3.15 0.25 0.45 0.71
EJES VERTICALES
EJE A,B,C,D
TRAMO 1-2 4.00 4.30 0.25 0.45 1.94
EJES VERTICALES
EJE A,B,C,D
TRAMO 1-2 8.00 4.30 0.45 15.48
02.03.05.03 ACERO f'y= 4200 KG/CM2 KG 524.49 N°ELEMENN° PIEZAS LONGITUD D. LINEAL
EJES HORIZONTALES
EJE 1-3
TRAMO A-B
As. Longitudinal 5/8'' 2.00 4.00 3.74 1.55 46.38
Estribos 3/8'' 2.00 26.00 1.34 0.56 39.02
TRAMO B-C
As. Longitudinal 5/8'' 2.00 4.00 3.49 1.55 43.28
Estribos 3/8'' 2.00 27.00 1.34 0.56 40.52
TRAMO C-D
As. Longitudinal 5/8'' 2.00 4.00 3.79 1.55 47.00
Estribos 3/8'' 2.00 27.00 1.34 0.56 40.52
EJES VERTICALES
EJE A,B,C,D
TRAMO 1-2
As. Longitudinal 5/8'' 4.00 4.00 5.79 1.55 143.59
Estribos 3/8'' 4.00 36.00 1.54 0.56 124.19
02.05 COBERTURAS
02.05.01 TEJA DE CEMENTO COLOREADA m² 135.24
Módulo 3 A= 112.95 A= 0.84 135.24
PLANILLA DE METRADOS - ESTRUCTURAS - AGUAS TURBIAS
OBRA: CONSTRUCCIÓN DE INFRAESTRUCTURA I.E N° 16682 AGUAS TURBIAS DISTRITO CAJARURO, PROVINCIA UTCUBAMBA-AMAZONAS.
DIMENSIONES
ITEM DESCRIPCION UND. METRADO N° VECES LARGO ANCHO ALTO PARCIAL
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.02 EXCAVACIONES SIMPLES
02.01.02.01 EXCAVACION DE ZANJAS, ZAPATAS Y VIGAS DE CIMENTACION Hmax=1.80M. M3 20.91
EJES HORIZONTALES:
ENTRE EJE 1,3
EJE A-B 2.00 1.00 1.00 1.80 3.60
CORTE A-A 2.00 1.13 0.30 1.00 0.68
EJE B 2.00 1.00 1.00 1.80 3.60
CORTE A-A 2.00 1.38 0.30 1.00 0.83
EJE B-C 2.00 1.00 1.00 1.80 3.60
ENTRE EJE 2
EJE A-B 1.00 1.00 1.00 1.80 1.80
CORTE C-C 1.00 1.13 0.30 1.00 0.34
EJE B 1.00 1.00 1.00 1.80 1.80
CORTE C-C 1.00 1.38 0.30 1.00 0.41
EJE B-C 1.00 1.00 1.00 1.80 1.80
EJES VERTICALES:
ENTRE EJE A,C
EJE 1-2(CORTE A-A) 2.00 1.45 0.30 1.00 0.87
EJE 2-3(CORTE A-A) 2.00 1.55 0.30 1.00
ENTRE EJE A¨
EJE 1-2 (CORTE D-D) 1.00 1.70 0.50 0.80 0.68
ENTRE EJE B
EJE 1-2 (CORTE B-B) 1.00 1.45 0.30 1.00 0.44
EJE 2-3 (CORTE B-B) 1.00 1.55 0.30 1.00 0.46
02.01.03 RELLENOS
02.01.03.01 RELLENO CON MATERIAL PROPIO
02.01.03.01.01 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 8.09
EJES HORIZONTALES:
ENTRE EJE 1,3
EJE A-B 2.00 A= 0.94 1.00 0.94
CORTE A-A 2.00 1.13 0.15 0.75 0.25
EJE B 2.00 A= 0.94 1.00 0.94
CORTE A-A 2.00 1.38 0.15 0.75 0.31
EJE B-C 2.00 A= 0.94 1.00 0.94
ENTRE EJE 2
EJE A-B 1.00 A= 0.94 1.00 0.94
CORTE C-C 1.00 1.13 0.15 0.75 0.13
EJE B 1.00 A= 0.94 1.00 0.94
CORTE C-C 1.00 1.38 0.15 0.75 0.16
EJE B-C 1.00 A= 0.94 1.00 0.94
EJES VERTICALES:
ENTRE EJE A,C
EJE 1-2(CORTE A-A) 2.00 1.45 0.15 0.75 0.33
EJE 2-3(CORTE A-A) 2.00 1.55 0.15 0.75 0.35
ENTRE EJE A¨
EJE 1-2 (CORTE D-D) 1.00 1.70 0.35 0.45 0.27
ENTRE EJE B
EJE 1-2 (CORTE B-B) 1.00 1.45 0.30 0.75 0.33
EJE 2-3 (CORTE B-B) 1.00 1.55 0.30 0.75 0.35
EJES HORIZONTALES:
ENTRE EJE 1
Z1 9.00 1.00 1.00 0.20 1.80
02.02.02 SOLADOS
02.02.02.01 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON M2 9.85
DIMENSIONES
ITEM DESCRIPCION UND. METRADO N° VECES LARGO ANCHO ALTO PARCIAL
02.02.04 VEREDAS
02.02.04.01 CORTE DE TERRENO NATURAL H=0.40m m3 6.10
A= 15.24 H= 0.40 6.10
DIMENSIONES
ITEM DESCRIPCION UND. METRADO N° VECES LARGO ANCHO ALTO PARCIAL
ENTRE EL EJE1,2,3
EJE A-B
As. Superior 5/8'' 3.00 3.00 2.35 1.55 32.82
As. Inferior 5/8'' 3.00 3.00 2.35 1.55 32.82
Estribos 3/8'' 3.00 19.00 1.34 0.56 42.77
EJE B-C
As. Superior 5/8'' 3.00 3.00 2.60 1.55 36.27
As. Inferior 5/8'' 3.00 3.00 2.60 1.55 36.27
Estribos 3/8'' 3.00 19.00 1.34 0.56 42.77
ENTRE EL EJE A,B,C
EJE 1-2
As. Superior 5/8'' 3.00 3.00 2.78 1.55 38.78
As. Inferior 5/8'' 3.00 3.00 2.78 1.55 38.78
Estribos 3/8'' 3.00 23.00 1.34 0.56 51.78
EJE 2-3
As. Superior 5/8'' 3.00 3.00 2.68 1.55 37.39
As. Inferior 5/8'' 3.00 3.00 2.68 1.55 37.39
Estribos 3/8'' 3.00 23.00 1.34 0.56 51.78
EJES VERTICALES:
ENTRE EL EJE A,B,C
EJES VERTICALES:
ENTRE EL EJE A,B,C
CORTE D-D 2.00 1.70 0.75 2.55
EJE 1-3 6.00 4.50 1.05 28.35
02.03.03.03 ACERO CORRUGADO FY=4200KG/CM2 GRADO 60 EN SOBRECIMIENTOS KG 64.70 N°ELEMENTN° PIEZAS LONGITUD D. LINEAL
ENTRE EL EJE 1
TRAMO A-C
As. Horizontal 3/8'' 1.00 4.00 3.50 0.56 7.84
As. vertical 3/8'' 1.00 11.00 1.35 0.56 8.32
ENTRE EL EJE 2
TRAMO A-C
As. Horizontal 3/8'' 1.00 4.00 2.63 0.56 5.89
As. vertical 3/8'' 1.00 8.00 1.35 0.56 6.05
ENTRE EL EJE 3
TRAMO A-C
As. Horizontal 3/8'' 1.00 4.00 2.73 0.56 6.12
As. vertical 3/8'' 1.00 8.00 1.35 0.56 6.05
EJES VERTICALES:
ENTRE EL EJE A,C
CORTE D-D
As. Horizontal 3/8'' 1.00 3.00 1.58 0.56 2.65
As. vertical 3/8'' 1.00 5.00 1.07 0.56 3.00
TRAMO 1-3
As. Horizontal 3/8'' 1.00 4.00 4.00 0.56 8.96
As. vertical 3/8'' 1.00 13.00 1.35 0.56 9.83
02.03.04 COLUMNAS
02.03.04.01 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS M3 3.14
C-1 9.00 A= 0.06 3.25 1.76
CL 22.00 A= 0.03 2.10 1.39
DIMENSIONES
ITEM DESCRIPCION UND. METRADO N° VECES LARGO ANCHO ALTO PARCIAL
CL 22.00 P= 0.70 2.10 32.34
02.03.04.03 ACERO f'y= 4200 KG/CM2 KG 779.06 N°ELEMENTN° PIEZAS LONGITUD D. LINEAL
C-1
As. Longitudinal 5/8'' 9.00 4.00 5.54 1.55 309.13
Estribos 3/8'' 9.00 36.00 0.96 0.56 174.18
CL
As. Longitudinal 3/8'' 22.00 4.00 3.79 0.56 186.77
Estribos 8mm 22.00 19.00 0.66 0.40 108.97
02.03.05 VIGAS
02.03.05.01 CONCRETO F'C=210 KG/CM2. PARA VIGAS M3 1.70
EJES HORIZONTALES
EJE 1-3
TRAMO A-B 2.00 1.88 0.25 0.40 0.38
TRAMO B-C 2.00 2.13 0.25 0.40 0.43
EJES VERTICALES
EJE A,B,C
TRAMO 1-3 2.00 4.50 0.25 0.40 0.90
EJES VERTICALES
EJE A,B,C
TRAMO 1-3 4.00 4.50 0.40 7.20
02.03.05.03 ACERO f'y= 4200 KG/CM2 KG 236.44 N°ELEMENTN° PIEZAS LONGITUD D. LINEAL
EJES HORIZONTALES
EJE 1-3
TRAMO A-B
As. Longitudinal 5/8'' 2.00 4.00 2.52 1.55 31.25
Estribos 3/8'' 2.00 18.00 1.24 0.56 25.00
TRAMO B-C
As. Longitudinal 5/8'' 2.00 4.00 2.77 1.55 34.35
Estribos 3/8'' 2.00 20.00 1.24 0.56 27.78
EJES VERTICALES
EJE A,B,C
TRAMO 1-3
As. Longitudinal 5/8'' 2.00 4.00 5.49 1.55 68.08
Estribos 3/8'' 2.00 36.00 1.24 0.56 50.00
02.05 COBERTURAS
02.05.01 TEJA DE CEMENTO COLOREADA m² 54.36
Módulo 4 A= 45.40 A= 0.84 54.36
PLANILLA DE METRADOS - ESTRUCTURAS - AGUAS TURBIAS
OBRA: CONSTRUCCIÓN DE INFRAESTRUCTURA I.E N° 16682 AGUAS TURBIAS DISTRITO CAJARURO, PROVINCIA UTCUBAMBA-AMAZONAS.
DIMENSIONES
ITEM DESCRIPCION UND. METRADO N° VECES LARGO ANCHO ALTO PARCIAL
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.02 EXCAVACIONES SIMPLES
02.01.02.01 EXCAVACION DE ZANJAS, ZAPATAS Y VIGAS DE CIMENTACION Hmax=1.80M. M3 16.34
EJES HORIZONTALES:
ENTRE EJE 1,2
EJE A-B 2.00 1.00 1.30 1.80 4.68
CORTE A-A 2.00 4.20 0.30 1.00 2.52
EJE A-B 2.00 1.00 1.30 1.80 4.68
EJES VERTICALES:
ENTRE EJE A,B
CORTE B-B 2.00 0.80 1.30 1.80 3.74
ENTRE EJE A"
CORTE C-C 1.00 0.50 1.80 0.80 0.72
02.01.03 RELLENOS
02.01.03.01 RELLENO CON MATERIAL PROPIO
02.01.03.01.01 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 5.37
EJES HORIZONTALES:
ENTRE EJE 1,2
EJE A-B 2.00 A= 1.18 1.00 1.18
CORTE A-A 2.00 4.20 0.15 0.75 0.95
EJE A-B 2.00 A= 1.18 1.00 1.18
EJES VERTICALES:
ENTRE EJE A,B
CORTE B-B 2.00 0.55 1.30 1.25 1.79
ENTRE EJE A"
CORTE C-C 1.00 1.80 0.35 0.45 0.28
02.02.04 VEREDAS
02.02.04.01 CORTE DE TERRENO NATURAL H=0.40m m3 4.68
A= 11.70 H= 0.40 4.68
DIMENSIONES
ITEM DESCRIPCION UND. METRADO N° VECES LARGO ANCHO ALTO PARCIAL
02.02.05.01 CONCRETO EN FALSOPISO F'C=140 KG/CM2 M2 13.00
1.00 A= 13.00 13.00
DIMENSIONES
ITEM DESCRIPCION UND. METRADO N° VECES LARGO ANCHO ALTO PARCIAL
EJE A-B 2.00 5.25 0.30 0.50 1.58
DEL EJE A y B
EJE 1-2 2.00 1.80 0.30 0.50 0.54
02.03.02.03 ACERO f'y= 4200 KG/CM2 KG 233.50 N°ELEMENN° PIEZAS LONGITUDD. LINEAL
DEL EJE 1 y 2
EJE A-B
As. Superior 5/8'' 2.00 3.00 5.85 1.55 54.48
As. Inferior 5/8'' 2.00 3.00 5.85 1.55 54.48
Estribos 3/8'' 2.00 41.00 1.34 0.56 61.53
DEL EJE A y B
EJE 1-2(corte B-B)
As. Superior 5/8'' 2.00 2.00 2.90 1.55 18.00
As. Inferior 5/8'' 2.00 2.00 2.90 1.55 18.00
Estribos 3/8'' 2.00 18.00 1.34 0.56 27.01
EJES VERTICALES:
ENTRE EL EJE A,B
CORTE C-C 1.00 1.80 0.15 0.75 0.20
EJE 1-2 2.00 1.80 0.25 1.55 1.40
EJES VERTICALES:
ENTRE EL EJE A,B
CORTE C-C 2.00 1.80 0.75 2.70
EJE 1-2 4.00 1.80 1.55 11.16
02.03.03.03 ACERO CORRUGADO FY=4200KG/CM2 GRADO 60 EN SOBRECIMIENTOS KG 75.98 N°ELEMENN° PIEZAS LONGITUDD. LINEAL
EJES HORIZONTALES:
ENTRE EL EJE 2
EJE A-B
As. Horizontal 3/8'' 2.00 4.00 2.50 0.56 11.20
As. vertical 3/8'' 1.00 8.00 1.35 0.56 6.05
ENTRE EL EJE 1
EJE A-B
As. Horizontal 3/8'' 2.00 4.00 2.06 0.56 9.23
As. vertical 3/8'' 1.00 6.00 1.35 0.56 4.54
EJES VERTICALES:
ENTRE EL EJE A,B
CORTE C-C
As. Horizontal 3/8'' 1.00 3.00 1.47 0.56 2.47
As. vertical 3/8'' 1.00 4.00 1.07 0.56 2.40
EJE 1-2
As. Horizontal 3/8'' 2.00 8.00 2.30 0.56 20.61
As. vertical 3/8'' 2.00 6.00 2.90 0.56 19.49
02.03.04 COLUMNAS
02.03.04.01 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS M3 2.00
C-01 4.00 A= 0.13 3.25 1.63
CL 6.00 A= 0.03 2.10 0.38
02.03.04.03 ACERO f'y= 4200 KG/CM2 KG 492.99 N°ELEMENN° PIEZAS LONGITUDD. LINEAL
C-01
As. Longitudinal 5/8'' 4.00 4.00 5.54 1.55 137.39
Estribos 3/8'' 4.00 36.00 1.46 0.56 117.73
As. Longitudinal 1/2'' 4.00 4.00 5.54 0.99 87.75
Estribos 3/8'' 4.00 36.00 0.90 0.56 72.58
CL
As. Longitudinal 3/8'' 6.00 4.00 3.79 0.56 50.94
Estribos 8mm 6.00 17.00 0.66 0.40 26.59
PLANILLA DE METRADOS - ESTRUCTURAS - AGUAS TURBIAS
OBRA: CONSTRUCCIÓN DE INFRAESTRUCTURA I.E N° 16682 AGUAS TURBIAS DISTRITO CAJARURO, PROVINCIA UTCUBAMBA-AMAZONAS.
DIMENSIONES
ITEM DESCRIPCION UND. METRADO N° VECES LARGO ANCHO ALTO PARCIAL
02.03.05 VIGAS
02.03.05.01 CONCRETO F'C=210 KG/CM2. PARA VIGAS M3 1.80
EJES HORIZONTALES
EJE 1-2
TRAMO A-B 2.00 5.25 0.25 0.55 1.44
EJES VERTICALES
EJE A,B
TRAMO 1-2 2.00 1.80 0.25 0.40 0.36
EJES VERTICALES
EJE A,B
TRAMO 1-2 4.00 1.80 0.40 2.88
02.03.05.03 ACERO f'y= 4200 KG/CM2 KG 213.91 N°ELEMENN° PIEZAS LONGITUDD. LINEAL
EJES HORIZONTALES
EJE 1-2
TRAMO A-B
As. Longitudinal 5/8'' 2.00 4.00 6.24 1.55 77.38
Estribos 3/8'' 2.00 43.00 1.54 0.56 74.17
EJES VERTICALES
EJE A,B
TRAMO 1-2
As. Longitudinal 5/8'' 2.00 4.00 2.79 1.55 34.60
Estribos 3/8'' 2.00 20.00 1.24 0.56 27.78
02.05 COBERTURAS
02.05.01 TEJA DE CEMENTO COLOREADA m² 38.72
Módulo 5 A= 32.34 A= 0.84 38.72
PLANILLA DE METRADOS - ESTRUCTURAS - RESUMEN AGUAS TURBIAS
OBRA: CONSTRUCCIÓN DE INFRAESTRUCTURA I.E N° 16682 AGUAS TURBIAS DISTRITO CAJARURO, PROVINCIA UTCUBAMBA-AMAZONAS.
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.02 EXCAVACIONES SIMPLES
02.01.02.01 EXCAVACION DE ZANJAS, ZAPATAS Y VIGAS DE CIMENTACION Hmax=1.80M. M3 83.23 46.82 36.42 20.91 16.34 203.72
02.01.03 RELLENOS
02.01.03.01 RELLENO CON MATERIAL PROPIO
02.01.03.01.01 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 41.04 25.62 22.05 8.09 5.37 102.15
02.01.03.02 RELLENO CON MATERIAL DE PRESTAMO
02.01.03.02.01 RELLENO CON AFIRMADO M3 7.03 5.25 3.84 1.80 1.33 19.25
02.01.04 NIVELACION INTERIOR Y APISONADO
02.01.04.01 NIVELACION Y COMPACTADO C/PLANCHA COMPACTADORA M2 121.31 71.38 55.16 24.44 15.60 287.89
02.01.05 ELIMINACION DE MATERIAL EXCEDENTE
02.01.05.01 ELIMINACIÓN DE MATERIAL EXCEDENTE CON VOLQUETE, CARGUIO A MANO M3 54.85 Err:509 18.68 16.67 14.27 Err:509
02.05 COBERTURAS
02.05.01 TEJA DE CEMENTO COLOREADA m² 258.02 174.03 135.24 54.36 38.72 660.37