Está en la página 1de 28

DOCUMENTO DE INSTALACION DE SITIO

3G SPLIT SECTOR 2020 EL SALVADOR

DIGICEL
TURIN
ID WCDMA AH0247
Document List 1
CONTENT

Document No.:

001 53-IPB 222 AH0247 Ues


Site Location & Plans 2
Fecha: Rev

13/10/2020 A

Site Information 3

DOCUMENTO DE INSTALACION
DE SITIO
Cable Diagram 4

Installation 5

DIGICEL
Verification List 6

Inventory 7
Datos del Sitio:

AH0247 Site Acceptance Certificate 8

TURIN
Additional Information 9

DIGICEL, 3G SPLIT SECTOR 2020, EL


SALVADOR

Este documento debe ser actualizado en sitio. En caso de


ocurrir cambios, todos los documentos deben ser
corregidos y firmados por el supervisor de instalación.

Luego de esto, debe ser devuelto al departamento de


Ingeniería para la preparación del As-built.
Document List

Prepared by Document No.

Luis Cano 001 51-IPB 222 AH0247 Ues


Approved By Rev. Date Archivo

Walter Yong A 13/10/2020

Proyecto: DIGICEL, 3G SPLIT SECTOR 2020, EL SALVADOR


Codigo de sitio: AH0247
Nombre de sitio: TURIN

Name Of Document Number of Document Rev.

DOCUMENTO DE INSTALACION DE SITIO LZN/ IPB 222 AH0247 Ues A

CONTENT 001 53-IPB 222 AH0247 Ues A

1 DOCUMENT LIST 001 51-IPB 222 AH0247 Ues A

2 SITE PLAN
Site Location 153 38-IPB 222 AH0247 Ues A
Floor Plan 193 05-IPB 222 AH0247 Ues A
Elevation & Antenna Plan 153 12-IPB 222 AH0247 Ues A

3 SITE INFORMATION
Configuration Data (RBS) 1/127 04-IPB 222 AH0247 Ues A
Material List 1/127 11-IPB 222 AH0247 Ues A
Dismantling Inventory 1/127 11-IPB 558 Uen A

4 CABLE DIAGRAM
Cable Diagram (Antenna Split Sector) 1/193 18-IPB 222 AH0247 Ues A
Cable Diagram Plas 2/193 18-IPB 222 AH0247 Ues A
Energy Connection 3/193 18-IPB 222 AH0247 Ues A

5 INSTALLATION
Installation Checklist 4/193 19-IPB 222 AH0247 Ues A

6 VERIFICATION LIST
Installation Checklist 2/006 51-FEA 208 524 Ues A

7 INVENTORY
INVENTORY LIST 4/153 11-IPB 222 AH0247 Ues A

8 SITE ACCEPTANCE CERTIFICATE


Final Acceptance Certificate 2/179 61-IPB 222 AH0247 Ues A

9 ADDITIONAL INFORMATION
Abbreviation List 006 51-IPB 222 AH0247 Ues A
Annexes

Este instructivo o cualquier parte de él hace parte de los derechos de propiedad intelectual y know-how de Ericsson, por tanto debe ser utilizado únicamente con el propósito de
proveer los servicios acordados en el contrato suscrito con Ericsson. El contrato aplicable contiene las obligaciones del usuario en caso de expiración o terminación de dicho
contrato. Copyright © 2006, Ericsson AB
Site Location

Prepared By Documento No.

Luis Cano 153 38-IPB 222 AH0247 Ues


Approved By Rev. Date: Archivo

Walter Yong A 13/10/2020

Proyecto: DIGICEL, 3G SPLIT SECTOR 2020, EL SALVADOR


ID de Sitio: AH0247
Nombre de Sitio TURIN

Dirección de Sitio K89 CARRETERA A AHUACHAPAN, ATIQUIZAYA

Latitud N: 13.96672 Longitud W: -89.758978


INGRESO

PLANTA DE SITIO
ACTUAL
TURIN
CLIENTE: DIGICEL EL SALVADOR
INGRESO

PLANTA DE SITIO
PROPUESTA
TURIN
CLIENTE: DIGICEL EL SALVADOR
A B C
ELEVACIÓN DE ANTENAS
ACTUAL
TURIN
CLIENTE: DIGICEL EL SALVADOR
A B C

ELEVACIÓN DE ANTENAS
PROPUESTA
TURIN
CLIENTE: DIGICEL EL SALVADOR
C A

CORTE DE ANTENAS
ACTUAL
TURIN
CLIENTE: DIGICEL EL SALVADOR
C A

CORTE DE ANTENAS
PROPUESTA
TURIN
CLIENTE: DIGICEL EL SALVADOR
Configuration Data (RBS)

Prepared By Document No.

Luis Cano 1/127 04-IPB 222 AH0247 Ues


Approved By Rev. Date Archive
Walter Yong A 13/10/2020

Project: DIGICEL, 3G SPLIT SECTOR 2020, EL SALVADOR


Site ID: AH0247
Site Name TURIN

1 INFORMACIÓN GENERAL DE SITIO


1.1 Coordenandas Lat. N: 13.96672 Long. W: -89.758978

1.2 Dirección: K89 CARRETERA A AHUACHAPAN, ATIQUIZAYA

1.3 Tipo de Sitio Greenfield


1.4 Equipment Location Outdoor

2 DATA TÉCNICA RBS (SECTOR SPLIT)


3.1 Sistema WCDMA
3.2 Baseband BB5216
3.3 No. de sectores 1
3.4 Configuración WCDMA Existente 2+2+2
3.5 Nueva Configuración WCDMA 2+2+2+2
3.6 No. De Radios por Sector 1
3.7 Frecuencia 900 MHz
3.8 Modelo de Radio R2219 B8
3.9 Dimensiones de Radio (mm) H= 66, W= 483, D= 355
3.10 Peso de Radio (kg) 10
3.11 Longitud de Cable DC Nuevo Radio (m) Sector 4 85
3.13 Longitud de Fibra Óptica Nuevo Radio (m) Sector 4 100m

3 SWAP
4.1 Escenario de Sitio Sitio Nuevo Split Sector

4.2 In Ground Swap Cold Swap Hot Swap N/A


4.3 Detalle Alcance de Swap a Nivel de piso:

4.4 On Tower Swap Cold Swap Hot Swap N/A


4.5 Detalle Alcance de Swap a Nivel de torre: Swap de Antena Sector 1 por nueva Antena Dual Beam

Nota: Swaps a implementarse para escenarios de Split Sector unicamente

4 POWER CONSUMPTION BB6630


5.1 Power Supply (V DC) -48
5.2 Power Consumption (W) 180W
5.3 DC Cirtuit Breaker (A) 20A
5.4 Heat Dissipation (W)

5 POWER CONSUMPTION BB5216


6.1 Power Supply (V DC) -48
6.2 Power Consumption (W) 240W
6.3 DC Cirtuit Breaker (A) 25A
6.4 Heat Dissipation (W)
Configuration Data (RBS)

Prepared By Document No.

Luis Cano 1/127 04-IPB 222 AH0247 Ues


Approved By Rev. Date Archive
Walter Yong A 13/10/2020

6 POWER CONSUMPTION R2219 B8


7.1 Power Supply (V DC) -48
7.2 Power Consumption (W) 350W
7.3 DC Cirtuit Breaker (A) 25A
7.4 Heat Dissipation (W)

7 POWER CONSUMPTION RRU S 01 B8


8.1 Power Supply (V DC) -48
8.2 Power Consumption (W) 350W
8.3 DC Cirtuit Breaker (A) 25A
8.4 Heat Dissipation (W) 0.35 kW

8 TECHNICAL DATA (ANTENNA) NEW SECTOR SPLIT


Sector 1-4 Sector 2-4 Sector 3-4
10.1 Altura de Antena (m.s.n.s.) 59.0 N/A N/A
10.2 Azimuth 50° N/A N/A
10.3 Tilt Mecánico 6° N/A N/A
10.4 Tilt Eléctrico 6° N/A N/A
10.5 Tipo de Antena ODDI-035R19B-Q N/A N/A
10.6 Ganancia (dBi) 19 N/A N/A
10.7 Dimensiones de Antena (H x D x W mm) H=2750, D=118, W=504 N/A N/A
10.8 Peso de Antena (kg) 39 kg N/A N/A
10.9 Max Wind Load @ 150 km/h (N) (Front/Side/Rear) 2369 / 219 / 2505 N/A N/A
10.10 Operational Max Wind Speed (km/h) 150 / 200 N/A N/A
10.11 Tipo de Conector 4 x 4.3-10 Female N/A N/A
10.12 Filtro
10.13 Tipo de Jumper 1/2" (4.3-10 -- 4.3-10 ) N/A N/A
10.14 Lonfigud de Jumper 2x1m, 2x2m, 2x3m N/A N/A
10.15 Cantidad de Jumpers 6 N/A N/A

9 ANTENNA SUPPORT TECHNICAL DATA (NEW SITE)


11.1 Type of Structure N/A
11.2 Structure Height (m) N/A
11.3 Pipe Type N/A
11.4 Pipe Dimmensions (mm) N/A

10 ANTENNA SUPPORT TECHNICAL DATA (SECTOR SPLIT)


12.1 Type of Structure Autosoportada M3
12.2 Structure Height (m) 60
12.3 Pipe Type Trillar
12.4 Pipe Dimmensions (mm) 3000mm x 7000m

11 ELECTRICAL DATA RBS 6101


14.1 Power supply (V DC) (-)48 V DC
14.2 Power consumption (kW) 9kW
14.3 Mains circuit breaker (A) 60A / 2P
Material List
Prepared (also subject responsible if other) No

Luis Cano 1/127 11-IPB 222 AH0247 Ues


Doc respons/Approved Checked Date Rev.

Walter Yong 13/10/2020 A

Proyecto: DIGICEL, 3G SPLIT SECTOR 2020, EL SALVADOR


Nombre de sitio: TURIN
Id de sitio: AH0247

DESCRIPCIÓN CÓDIGO DE PRODUCTO QTY


ENCLOSURE
1 EQUIPPED CABINET/Enclosure 6150; AGO 10/BFM 107 206/628 0
2 ACCUMULATOR/SBS 190 Eon 4X12V, 190Ah .BKC90106/123 0
BASEBANDS
3 BASEBAND 6630 KDV127621/11 0
4 BASEBAND 5216 KDU137925/31 0
RADIO
5 Radio 2219 B8;Radio Unit KRC161670/1 1
FILTERS
7 897.2-960MHz Bandpass Filter TBD 1
ANTENNAS
8 Outdoor Directional Single-band Antenna ODI-032R20M-Q 0
9 Outdoor Directional Twin-beam Antenna ODDI-035R19B-Q 1

NOTA: El listado completo de materiales será anexado como MDR, el listado en esta página
contiene únicamente el HW relevante para la implementación
Dismantling Inventory
Prepared (also subject responsible if other) No

Luis Cano 1/127 11-IPB 558 Uen


Doc respons/Approved Checked Date Rev.

Walter Yong 13/10/2020 A

Proyecto: DIGICEL, 3G SPLIT SECTOR 2020, EL SALVADOR


Nombre de sitio: TURIN
Id de sitio: AH0247

Favor llenar el inventario del equipo a desinstalar, esto puede aplicar a Split Sectors en la mayoria de escenarios
sin embargo, el llenado puede aplicar a cualquier otro escenario donde aplique desinstalación de equipos.

Cantidad Modelo Código de Producto Número de Serie Estado Comentarios


Antena WCDMA Sector 1
1 N/V KRE 101 2093 1 N/V OK
(Código obtenido de RND)
Cable Diagram (Antenna Split Sector)

Preparado por Documento No.

Luis Cano 1/193 18-IPB 222 AH0247 Ues


Aprobado por Rev. Fecha Archivo

Walter Yong A 13/10/2020

Project: DIGICEL, 3G SPLIT SECTOR 2020, EL SALVADOR


Site ID: AH0247
Site Name: TURIN

SECTOR 1 - 4 WCDMA
ODDI-035R19B-Q

3m Jumper from Filter to


4.3-10 Antenna
Connector

2m Jumper from Filter to


Antenna

897.2-960MHz 897.2-960MHz
Bandpass Filter Bandpass Filter

4.3-10
Connector

7-16 N-DIN
1m Jumper from
Connector Radio to Filter

RRU S 01 B8 Existente
R2219 B8 Nuevo
SECTOR 1
SECTOR 4

CABLES
TX/RX A
TX/RX B
COMBA KATHREIN MOD NV KATHREIN
ODDI-035R19B-Q 739 686 739 686

GSM GSM
WCDMA
WCDMA WCDMA SECTOR A SECTOR B
SECTOR 2
SECTOR 1 SECTOR 4

RADIO 900MHz RADIO 900MHz


DENTRO DE DENTRO DE
GABINETE 2116 GABINETE 2116

R2219 B8 R01 B8
R01 B8 PROPUESTO EXISTENTE

DX1
DX2
EXISTENTE
DX2DX1
DX1 DX2 DX1 DX2 DX1 DX2

JUMPER JUMPER JUMPER JUMPER JUMPER

ERICSSON SLF ANTA ANTB

ANTA ANTB ANTA ANTB


SLF ERICSSON

PWR
SLF
ERICSSON ERICSSON
FEEDER RBSA RBSB

FEEDER
OPT in
RBSA RBSB RBSA RBSB

ANTA PWR
PWR ANTB OPT in
ANTA
OPT in ANTB JUMPER
ANTA
ANTB JUMPER

MOD NV KATHREIN
739 686
DIAGRAMA DE DISTRIBUCIÓN GSM
DE CABLES BB6630 WCDMA 900 MHz WCDMA
SECTOR C
CONFIGURACIÓN 2+2+2+2 WCDMA SECTOR 3

RADIO 900MHz
DENTRO DE
GABINETE 2116

R01 B8
EXISTENTE

DX2
DX1
DX1 DX2

JUMPER JUMPER JUMPER

BB5216 NUEVO SLF ANTA ANTB

ERICSSON
1 2 3 4 5 6

RBSA RBSB

FEEDER
PWR
OPT in
ANTA
ANTB JUMPER

SPD EXISTENTE

RBS6101 EXISTENTE
Energy Connection

Preparado por Documento No.

Luis Cano 3/193 18-IPB 222 AH0247 Ues


Aprobado por Rev. Fecha Archivo

Walter Yong A 13/10/2020

Project: DIGICEL, 3G SPLIT SECTOR 2020, EL SALVADOR


Site ID: AH0247
Site Name: TURIN

PDU0101 PDU0104 (1) PDU0104 (2)

1 2 3 4

SPDs

BASEBAND 5216

R2219 B8
Sector 4

SPDs CABLES
Existente Cable DC (TFL492325/)
Nuevo (A instalar) CABLE ET20
Installation Checklist

Preparado por Documento No.

Luis Cano 4/193 19-IPB 222 AH0247 Ues


Aprobado por Rev. Fecha Archivo
Walter Yong A 13/10/2020

Project: DIGICEL, 3G SPLIT SECTOR 2020, EL SALVADOR


Site ID: AH0247
Site Name: TURIN

OK | NOK Comments
1 ANTENNA INSTALLATION
SECTOR 1
1.1 Antenna instalation according to SID
1.2 Stable pipe verified
1.3 Verified antenna bracket and proper installation
1.4 Verified proper filter installation
1.5 Radios grounded to grounding bar
1.6 Verified Downtilt (Electrical & Mechanical)
1.7 Azimuth verified
1.8 Check installation, sealing and correct tightening
Of the connectors in antennas
1.9 Verified jumpers installation
1.10 Verified jumper labeling
SECTOR 2
1.1 Antenna instalation according to SID
1.2 Stable pipe verified
1.3 Verified antenna bracket and proper installation
1.4 Verified proper filter installation
1.5 Radios grounded to grounding bar
1.6 Verified Downtilt (Electrical & Mechanical)
1.7 Azimuth verified
1.8 Check installation, sealing and correct tightening
Of the connectors in antennas
1.9 Verified jumpers installation
1.10 Verified jumper labeling
SECTOR 3
1.1
Antenna instalation according to SID
1.2
Stable pipe verified
1.3
Verified antenna bracket and proper installation
1.4
Verified proper filter installation
1.5
Radios grounded to grounding bar
1.6
Verified Downtilt (Electrical & Mechanical)
1.7
Azimuth verified
1.8
Check installation, sealing and correct tightening
Of the connectors in antennas
1.9 Verified jumpers installation
1.10 Verified jumper labeling
2 OPTICAL FIBER ROUTE AND PROPER INSTALLATION
2,.1 Verified non damaged optical fibers
2.2 Check fastening of the conduit trajectory for OIL
2.3 Check sealing of couplers and tube terminators LT
2.4 Check the placement of Tube distribution boxes LT
2.5 Check the OIL surplus arrangement
2.6 Check the OIL at the entrance of the ENC (Roxtec)
Installation Checklist

Preparado por Documento No.

Luis Cano 4/193 19-IPB 222 AH0247 Ues


Aprobado por Rev. Fecha Archivo
Walter Yong A 13/10/2020

3 BASE STATION INSTALLATION


3.1 RBS & RRU installation according to SID
3.2 Radio Installation verified
3.3 Power cable to RRU
3.4 Alarm Set-up for ENC6150
3.5 Site without alarm failure
3.6 Baterries tested
3.7 AC Power circuit testing
3.8 SCU Configured and tested
3.9 Voltage measurement in RBS and RRU
3.10 Indoor Cable labeling

4 GENERAL
3.12 Sealed conduit Optical fibel and Power Cable
3.13 Sealed Enclosure Roxtec

Checked by Ericsson

Name

Signature Date

Checked by Digicel

Name

Signature Date
Installation Checklist

Preparado por Documento No.

Luis Cano 2/006 51-FEA 208 524 Ues


Aprobado por Rev. Fecha Archivo
Walter Yong A 13/10/2020

Project: DIGICEL, 3G SPLIT SECTOR 2020, EL SALVADOR


Site ID: AH0247
Site Name: TURIN

DIGICEL

TURIN

AH0247

Certificamos que Ericsson a cumplido con la instalación, integración, pruebas y documentación del sitio:
AH0247 TURIN, de acuerdo a los requerimientos de su cliente (DIGICEL) El Salvador

Referencia elaborada con las recomendaciones y documentación especificas del trabajo realizado.

Fecha

Nombre: Nombre:

Firma: Firma:

Digicel Ericsson
INVENTORY LIST
Prepared (also subject responsible if other) No

Luis Cano 4/153 11-IPB 222 AH0247 Ues


Doc respons/Approved Checked Date Rev.

Walter Yong 13/10/2020 A IPB 558 AH0247 Ues

Proyecto: DIGICEL, 3G SPLIT SECTOR 2020, EL SALVADOR


Nombre de Sitio: TURIN
ID de Sitio: AH0247

Hoja de Inventario a ser llenada Post-Instalación


DESCRIPCIÓN CÓDIGO No. SERIE Rev FECHA
1 EQUIPPED CABINET/Enclosure 6150; AGO
2 BASEBAND 6630
3 BASEBAND 5216
4 Radio 2219 B8;Radio Unit
5 Radio 2219 B8;Radio Unit
6 Radio 2219 B8;Radio Unit
7 RRUS 01 B8;Radio Unit
8 RRUS 01 B8;Radio Unit
9 RRUS 01 B8;Radio Unit
10 ANTENNA (900MHz)
11 ANTENNA (900MHz)
12 ANTENNA (900MHz)
13 BATTERY
14 BATTERY
15 BATTERY
16 BATTERY
17 BATTERY
18 BATTERY
19 BATTERY
20 BATTERY
21
22
23
24
25
Abbreviation List

Preparado por Documento No.

Luis Cano 006 51-IPB 222 AH0247 Ues


Aprobado por Rev. Fecha Archivo
Walter Yong A 13/10/2020

Project: DIGICEL, 3G SPLIT SECTOR 2020, EL SALVADOR


Site ID: AH0247
Site Name: TURIN

ABBREVIATION LIST

3G Third Generation
A:DX1/DX2 Duplex antenna 1 and 2 in cell A
ACCU Alternating Current Connection Unit
ALEX Active Library Explorer
AMM Access Module Magazine
ASC Antenna System Controller
ATM Asynchronous Transfer Mode
BB Baseband
BBS Battery Backup System
BFU Battery Fuse Unit
BTF Barra de Tierra Fisica
BTS Base Transceiver Station
CBU1 Control Base Unit
CDU Combining and Distribution Unit
CGO Cama de Guia de Onda
CPU Central Processing Unit
dBm Decibel referred to milliwatt
DC Direct Current
DCCU DC Connection Unit
DCCU BOX DC Connection Unit Box
DDF Digital Distribution Frame
ddTMA Dual Duplex TMA
DDTMA Dual Duplex Tower Mounted Amplifier
DDU DC Distribution Unit
DF Distribution Frame
DHCP Distribution Frame
DRU Dynamic Host Configuration Protocol
DTMA Dual Radio Unit
dTRU Duplex Tower Mounted Amplifier
DXC duplex Transceiver Unit
DXX Digital Cross Connect
EAC Digital Cross Connect
EACU External Alarm Channel
EDGE External Alarm Connection Unit
EDT External Alarm Connection Unit
EMC Enhanced Data rates for GSM Evolution
EMI Electrical Down Tilt
ESB Electromagnetic Compatibility
ESD Electromagnetic Interference
ESB External Synchronization Bus
FCU Fan Control Unit
FTP File Transfer Protocol
FU Filter Unit
GPRS General Packet Radio Service
GPS Global Positioning System
HLR Home Location Register
HLS Higher Layer Scheduling
HMAC Hashed Message Authentication Code
HN Home Network
HO Handover
HP High Power
Abbreviation List

Preparado por Documento No.

Luis Cano 006 51-IPB 222 AH0247 Ues


Aprobado por Rev. Fecha Archivo
Walter Yong A 13/10/2020

Project: DIGICEL, 3G SPLIT SECTOR 2020, EL SALVADOR


Site ID: AH0247
Site Name: TURIN

ht.a.fl.l Height above floor level


HTTP Hypertext Transfer Protocol
ID Identifier
IP Internet Protocol
LTU Line Terminal Unit
m a.g.l. Metre above ground level
MET Main Earth Terminal
MMU Modem Unit
MSC Mobile Services Switching Center
MU Main Unit
MUX Multiplexer
NCC Node Communication Channel
NPU Node Processor Unit
NTP Network Time Protocol
OBIF Optical Baseband Interface
OIL Optical interface link
OM Operation(s) and Maintenance
OMINF Operation and Maintenance INFrastructure
OVP Overvoltage Protection
PBC-05 Power Battery Cabinet
PCM Pulse Code Modulation
PDU Power Distribution Unit
PFU Power Filter Unit
RAU Radio Unit
RAX Random Access and Receiver
RBS Radio Base Station
RD Receive Data
RRU Remote Radio Unit
RX Receiver
SAU Service Access Unit
SMU Switch Multiplexer Unit
SSU Site Solution Unit
TD Transmit Data
TEMS Test Mobile System
TMA Tower Mounted Amplifier
TMR Transmission Rack
TPU Transient Protection Unit
TRP Transceiving Receiving Processing
TRU Transceiver Unit
TRX Transceiver
TU Transceiver Unit
TX Transmitter
UDTS Unitdata Service
UMTS Universal Mobile Telecommunications System
VPN Virtual Private Network
VSWR Voltage Standing Wave Ratio
WCDMA Wideband Code Division Multiple Access
WWW World Wide Web
XALM External Alarm Unit
XML Extensible Markup Language
XALM External Alarm Unit
XML Extensible Markup Language
Annexes

Preparado por Documento No.

Luis Cano
Aprobado por Rev. Fecha Archivo
Walter Yong A 13/10/2020
Outdoor Directional Twin-beam Antenna
ODDI-035R19B-Q
 XX Pol,35°Horizontal Beamwidth
 824-960/824-960MHz
 19.2/19.2dBi, E-Tilt: 0-10/0-10
 Integrated RCU Preliminary Issue

Electrical Specifications
R1 824-960, R2 824-960
Frequency Range (MHz)
824-862 862-894 894-960
Polarization ±45°
Gain (dBi) 18.8 19.0 19.2
Horizontal Beam Centers (°) 28 26 25
Horizontal Beamwidth (°) 37 35 32
Vertical Beamwidth (°) 7.5 7.0 6.5
Electrical Downtilt (°) 0-10 / 0-10
1st Upper Sidelobe Suppression (dB) ≥18 ≥18 ≥18
Front-to-Back Ratio (dB) ≥28 ≥26 ≥25
VSWR ≤1.5:1
Isolation Intra-system (dB) ≥25
Maximum Power per Port (W) 500
IM3 (2x43 dBm Carrier) (dBc) ≤-150
Impedance (Ω) 50
Lightning Protection Direct Ground

Mechanical Specifications Outline Drawing


Dimensions, HxWxD (mm) / (in) 2750x504x118 / 108.3x19.8x4.6
Shipping Dimensions, HxWxD(mm) / (in) 3090x616x184 / 121.7x24.3x7.2
Net Weight, Antenna (kg) / (Ib) 39.0 / 86.0
Net Weight, Mounting Kit (kg) / (Ib) 9.2 / 20.3
Shipping Weight (kg) / (Ib) 58.0 / 127.9
Connector Type 4 x 4.3-10 Female
Connector Location Bottom
Radome Material Fiberglass
Operational Temperature (°C) -40 to +70
Operational Humidity (%) ≤95
Operational / Max Wind Speed (km/h) 150 / 200
Wind Load @150km/h
2369 / 219 / 2505
Frontal / Lateral / Rearside (N)

RET Specifications
RET type Integrated motor, replaceable
Protocol to CCU/TMA 3GPP / AISG 2.0
Input Voltage Range (V) +10 to +30 DC
Power Consumption (W) ≤1(stand by); ≤5(operating)
Connectors to CCU 8 pin connector, Male, conform to AISG 2.0
Connectors to RCU 8 pin connector, Female, conform to AISG 2.0

©Comba Telecom. All rights reserved


1/2
Information contained in this document is subject to confirmation at time of ordering.
Specifications may differ depending on region and customers’ requirements.
DS-Control: 0-0-0 / 0720
Outdoor Directional Twin-beam Antenna
ODDI-035R19B-Q
 XX Pol,35°Horizontal Beamwidth
 824-960/824-960MHz
 19.2/19.2dBi, E-Tilt: 0-10/0-10
 Integrated RCU Preliminary Issue

Connector Position
504

118

Accessories
Model Quantity Description
BA.K.04.00001 1 Mounting Kit, 0-8°tilt.

Typical Patterns

Azimuth Elevation

©Comba Telecom. All rights reserved


2/2
Information contained in this document is subject to confirmation at time of ordering.
Specifications may differ depending on region and customers’ requirements.
DS-Control: 0-0-0 / 0720
Product Specifications
897.2-960MHz Bandpass Filter

Main Features

 Compact, low weight


 High Isolation
 High reliability
 Simple installation

Electrical Specifications

Frequency: UL:897.2-915MHz
DL:942.2-960MHz

Out of Band Rejection:


≧35dB(869-882.2MHz)
≧45dB(882.2-887.2MHz)
≧55dB(887.2-892.2MHz)
≧35dB(892.2-894MHz)

Insertion Loss: UL:≤2.0d(typical≤0.5dB)


DL:≤0.4dB

Return Loss: ≥20dB


Intermodulation (3rd order)  -110dBm @ 2 x 43dBm carrier
Power Handling: 200W avg
DC Path: 40V.3A,3GPP(AISG)transparent
Impedance 50Ω

Environmental Specifications

Operating temperature range: -10°C to +55°C


Applications: IP67

Mechanical Specifications

Connectors type 4310-Female


Weight(kg) **
Packing 1Pc in box
Product Specifications
897.2-960MHz Bandpass Filter

Outline Drawing: