DOCUMENTO DE INSTALACION DE SITIO

LTE ROLLOUT 2020 EL SALVADOR

DIGICEL
SAN FRANCISCO 2
ID LTE SS0567L
Document List 1
CONTENT

Document No.:

001 53-IPB 222 SS0567L Ues


Site Location & Plans 2
Fecha: Rev

4/12/2020 A

Site Information 3

DOCUMENTO DE INSTALACION
DE SITIO
Cable Diagram 4

Alarm Distribuition 5

DIGICEL
Verification List 6

Inventory 7
Datos del Sitio:

SS0567L Site Acceptance Certificate 8

SAN FRANCISCO 2
Additional Information 9

DIGICEL, LTE ROLLOUT 2020, EL


SALVADOR

Este documento debe ser actualizado en sitio. En caso de


ocurrir cambios, todos los documentos deben ser
corregidos y firmados por el supervisor de instalación.

Luego de esto, debe ser devuelto al departamento de


Ingeniería para la preparación del As-built.
Document List

Prepared by Document No.

ERICSSON / Eddy Ramírez Saucedo 001 51-IPB 222 SS0567L Ues


Approved By Rev. Date Archivo

ERICSSON / Walter Yong A 4/12/2020

Proyecto: DIGICEL, LTE ROLLOUT 2020, EL SALVADOR


Codigo de sitio: SS0567L
Nombre de sitio: SAN FRANCISCO 2

Name Of Document Number of Document Rev.

DOCUMENTO DE INSTALACION DE SITIO LZN/ IPB 222 SS0567L Ues A

CONTENT 001 53-IPB 222 SS0567L Ues A

1 DOCUMENT LIST 001 51-IPB 222 SS0567L Ues A

2 SITE PLAN
Site Location 153 38-IPB 222 SS0567L Ues A
Floor Plan 193 05-IPB 222 SS0567L Ues A
Elevation & Antenna Plan 153 12-IPB 222 SS0567L Ues A

3 SITE INFORMATION
Configuration Data (RBS) 1/127 04-IPB 222 SS0567L Ues A
Material List (RBS) 1/127 11-IPB 222 SS0567L Ues A
Dismantling Inventory 1/127 11-IPB 222 SS0567L Ues A

4 CABLE DIAGRAM
Cable Diagram (Enclosure / RRU / Antennas) 1/193 18-IPB 222 SS0567L Ues A
Cable Diagram (Schematic Antennas & RRU's) 2/193 18-IPB 222 SS0567L Ues A
Cable Diagram (Schematic Power Connection) 3/193 18-IPB 222 SS0567L Ues A
Cable Diagram (Schematic TX) 3/193 18-IPB 222 SS0567L Ues A

5 ALARM DISTRIBUITION
Alarm Configuration Table 4/193 19-IPB 222 SS0567L Ues A

6 VERIFICATION LIST
Installation Checklist 2/006 51-208-IPB 222 SS0567L Ues A

7 INVENTORY
INVENTORY LIST 4/153 11-IPB 222 SS0567L Ues A

8 SITE ACCEPTANCE CERTIFICATE


Final Acceptance Certificate 2/179 61-IPB 222 SS0567L Ues A

9 ADDITIONAL INFORMATION
Abbreviation List 006 51-IPB 222 SS0567L Ues A
Annexes

Este instructivo o cualquier parte de él hace parte de los derechos de propiedad intelectual y know-how de Ericsson, por tanto debe ser utilizado únicamente con el propósito de
proveer los servicios acordados en el contrato suscrito con Ericsson. El contrato aplicable contiene las obligaciones del usuario en caso de expiración o terminación de dicho
contrato. Copyright © 2006, Ericsson AB
Ubicación de Sitio

Prepared By Documento No.

ERICSSON / Eddy Ramírez Saucedo 153 38-IPB 222 SS0567L Ues


Approved By Rev. Date: Archivo

ERICSSON / Walter Yong A 4/12/2020

Proyecto: DIGICEL, LTE ROLLOUT 2020, EL SALVADOR


ID de Sitio: SS0567L
Nombre de Sitio SAN FRANCISCO 2

Dirección de Sitio Calle 5 y Calle Antigua a Huizucar, Antiguo Cuscatlán San Salvador, El Salvador

Latitud N: 13.6721 Longitud W: -89.2299


so
ce
Ac

PLANTA DE SITIO
ACTUAL
SAN_FRANCISCO_2
CLIENTE: DIGICEL EL SALVADOR
A B C

ELEVACIÓN DE ANTENAS
ACTUAL
SAN_FRANCISCO_2
CLIENTE: DIGICEL EL SALVADOR
CORTE DE ANTENAS
ACTUAL
SAN_FRANCISCO_2
CLIENTE: DIGICEL EL SALVADOR
o
ces
Ac

PLANTA DE SITIO
PROPUESTA
SAN_FRANCISCO_2
CLIENTE: DIGICEL EL SALVADOR
A B C

ELEVACIÓN DE ANTENAS
PROPUESTA
SAN_FRANCISCO_2
CLIENTE: DIGICEL EL SALVADOR
CORTE DE ANTENAS
PROPUESTA
SAN_FRANCISCO_2
CLIENTE: DIGICEL EL SALVADOR
Configuration Data (RBS)

Prepared By Document No.

ERICSSON / Eddy Ramírez Saucedo 1/127 04-IPB 222 SS0567L Ues


Approved By Rev. Date Archive
ERICSSON / Walter Yong A 4/12/2020

Project: DIGICEL, LTE ROLLOUT 2020, EL SALVADOR


Site ID: SS0567L
Site Name SAN FRANCISCO 2

1 INFORMACIÓN GENERAL DE SITIO


1.1 Coordenandas Lat. N: 13.6721 Long. W: -89.2299

1.2 Dirección: Calle 5 y Calle Antigua a Huizucar, Antiguo Cuscatlán San Salvador, El Salvador

1.3 Tipo de Sitio Outdoor Greenfield


1.4 Equipment Location Outdoor
1.5 Gabinete Existente RBS 6101
1.6 Respaldo de Baterías 1 BBS 6101

2 DATA TÉCNICA RBS (NUEVO LTE)


2.1 Sistema Existente GSM + WCDMA
2.2 Baseband Nuevo LTE BB6630
2.3 No. de sectores Existentes GSM 3 WCDMA 3
2.4 No. Nuevos sectores LTE LTE 3
2.5 Modalidad de Nuevas Antenas (Tech) LTE ONLY
2.6 No. De Radios por Sector (Antena Sectorial) 1
2.7 Frecuencia 1900 MHz
2.8 Modelo de Radio RRU 4415 B2
2.9 Dimensiones de Radio (mm) H= 420, W= 342, D= 160
2.10. Peso de Radio (kg) 21.5
2.11 Longitud de Cable DC (m) Sector 1 B2 40 Sector 2 B2 40 Sector 3 B2 40
Sector 4 B2 N/A Sector 5 B2 N/A Sector 6 B2 N/A
2.13 Longitud de Fibra Óptica (m) Sector 1 B2 50 Sector 2 B2 50 Sector 3 B2 50
Sector 4 B2 N/A Sector 5 B2 N/A Sector 6 B2 N/A

3 SWAP
4.1 Escenario de Sitio Sitio Nuevo Nuevo LTE

4.2 In Ground Swap Cold Swap Hot Swap N/A


4.3 Detalle Alcance de Swap a Nivel de piso: Se instalará BB 6630, R6672, PDU 0104, PSU AC03 y 1 SPD
a Instalar en RBS 6101
Se requiere hacer espacio en riel de OVP par 1 SPD

4.4 On Tower Swap Cold Swap Hot Swap N/A


4.5 Detalle Alcance de Swap a Nivel de torre: Se requiere desinstalar Soporte Bandera por Soporte H
en los 3 sectores para instalar nueva antena LTE
Se propone nueva barra de tierras a 22m en monopolo

4 POWER CONSUMPTION BB 6630


5.1 Power Supply (V DC) -48
5.2 Power Consumption (W) 180W
5.3 DC Cirtuit Breaker (A) 20A
5.4 Heat Dissipation (W)

5 POWER CONSUMPTION RRU 4415 B2


6.1 Power Supply (V DC) -48
6.2 Power Consumption (W) 350W
6.3 DC Cirtuit Breaker (A) 25A
6.4 Heat Dissipation (W) 0.51kW
Configuration Data (RBS)

Prepared By Document No.

ERICSSON / Eddy Ramírez Saucedo 1/127 04-IPB 222 SS0567L Ues


Approved By Rev. Date Archive
ERICSSON / Walter Yong A 4/12/2020

6 POWER CONSUMPTION RRU 2219 B8


7.1 Power Supply (V DC) -48
7.2 Power Consumption (W) 350W
7.3 DC Cirtuit Breaker (A) 25A
7.4 Heat Dissipation (W)

7 POWER CONSUMPTION RRU 01 B8


8.1 Power Supply (V DC) -48
8.2 Power Consumption (W) 350W
8.3 DC Cirtuit Breaker (A) 25A
8.4 Heat Dissipation (W) 0.35 kW

9 TECHNICAL DATA (ANTENNA) NEW LTE SITE


SECTOR 1 (B2) SECTOR 2 (B2) SECTOR 3 (B2)
9.1 Altura de Antena (m.s.n.s.) 24.0 24.0 24.0
9.2 Azimuth 35 170 300
9.3 Tilt Mecánico 0 2 6
9.4 Tilt Eléctrico RCU RCU RCU
9.5 Tech Por Antena LTE ONLY LTE ONLY LTE ONLY
9.6 Tipo de Antena HBXX-6517DS-VTM HBXX-6517DS-VTM HBXX-6517DS-VTM
9.7 Ganancia (dBi) 19 / 19.1 / 19.2 19 / 19.1 / 19.2 19 / 19.1 / 19.2
9.8 Dimensiones de Antena (H x D x W mm) H=1906, D=305, W=166 H=1906, D=305, W=166 H=1906, D=305, W=166
9.9 Peso de Antena (kg) 28.2 KG 28.2 KG 28.2 KG
9.10 Max Wind Load @ 150 km/h (N) (Front/Side/Rear) 668/175/777 668/175/777 668/175/777
9.11 Operational Max Wind Speed (km/h) 241 241 241
9.12 Tipo de Conector 4 x 7-16 N-DIN 4 x 7-16 N-DIN 4 x 7-16 N-DIN
9.13 TIPO RETU INTERNO INTERNO INTERNO
9.14 Tipo de Jumper 1/2" (4.3-10 M -- 7-16 M) 1/2" (4.3-10 M -- 7-16 M) 1/2" (4.3-10 M -- 7-16 M)
9.15 Lonfigud de Jumper 3 3 3
9.16 Cantidad de Jumpers 4 4 4

10 ANTENNA SUPPORT TECHNICAL DATA (NEW SITE)


10.1 Type of Structure Monopolo
10.2 Structure Height (m) 24
10.3 Pipe Type Sencillo
10.4 Pipe Dimmensions (mm) 3000

11 NUEVO EQUIPO DE TX
11.1 Tipo de Nuevo equipo de transmisión (Tx) FIBER
11.2 Modelo Equipo de Transmisión (Tx) R6672
11.3 Ubicación Propuesta del equipo de Transmisión (Tx) RBS6101

12 POWER EXPANSION
12.1 Gabiente a Expandir N/A
12.2 Modelo de Nuevo PSU / Rect. PSU AC 03
12.3 Modelo de Nuevo PDU PDU0104
12.4 Cantidad de Nuevos SPDs 1
12.5 Cantidad y Amperaje de Nuevos CB DC 1x20A+2x6A+3x25A
12.6 Cantidad de Nuevos Cables DC 3
12.7 Battery Swap N/A
12.8 Modelo de nuevas Baterias N/A
12.9 Amperaje de Nuevas Baterias N/A
Lista de Materiales 1(1)
Prepared (also subject responsible if other) No

ERICSSON / Eddy Ramírez Saucedo 1/127 11-IPB 222 SS0567L Ues


Doc respons/Approved Checked Date Rev.

ERICSSON / Walter Yong 4/12/2020 A

Proyecto: DIGICEL, LTE ROLLOUT 2020, EL SALVADOR


Nombre de sitio: SAN FRANCISCO 2
Id de sitio: SS0567L

DESCRIPCIÓN CÓDIGO DE PRODUCTO QTY


ENCLOSURE
1 EQUIPPED CABINET/Enclosure 6150; AGO 10/BFM 107 206/628 0
2 ACCUMULATOR/SBS 190 Eon 4X12V, 190Ah .BKC90106/123 0
BASEBANDS
3 BASEBAND 6630 KDV127621/11 1
ROUTERS
4 R6672 TBD 1
5 R6675 TBD 0
6 TDM1001 TBD 0
RADIO
7 Radio 4415 B2 B25;Radio Unit KRC161636/1 3
ANTENNAS
8 ANTENNA/4-Port Antenna 2HB 1.5m 80010622V01 0
9 8-Port Antenna 2LB/2HB 2.4m 80010826 0
10 Dual Band 1L2H (6P) ODI-065R17M18JJ-GQ V1 0
11 Dual Beam (8P) ODDI2-032R18J02-GQ V1 0
12 ANTENNA/4-Port HBXX-6517DS-VTM 3
POWER UNITS
12 PDU0104 TBD 1
13 PSU AC03 TBD 1

NOTA: El listado completo de materiales será anexado como MDR, el listado en esta página
contiene únicamente el HW relevante para la implementación
Dismantling Inventory 1(1)
Prepared (also subject responsible if other) No

ERICSSON / Eddy Ramírez Saucedo 1/127 11-IPB 222 SS0567L Ues


Doc respons/Approved Checked Date Rev.

ERICSSON / Walter Yong 4/12/2020 A

Proyecto: DIGICEL, LTE ROLLOUT 2020, EL SALVADOR


Nombre de sitio: SAN FRANCISCO 2
Id de sitio: SS0567L

Favor llenar el inventario del equipo a desinstalar.

Cantidad Modelo Código de Producto Número de Serie Estado Comentarios


Distribución de Cables

Preparado por Documento No.

ERICSSON / Eddy Ramírez Saucedo 2/193 18-IPB 222 SS0567L Ues


Aprobado por Rev. Fecha Archivo

ERICSSON / Walter Yong A 4/12/2020

Project: DIGICEL, LTE ROLLOUT 2020, EL SALVADOR


Site ID: SS0567L
Site Name: SAN FRANCISCO 2

Antenna Single Band 4P


HBXX-6517DS-VTM

7-16 N-DIN
Connector
7-16 N-DIN
Connector

4.3-10
Connector

4.3 - 10
Connector

RRU 4415 B2 CABLES


LTE
TX/RX A
TX/RX B
Distribución de Cables

Preparado por Documento No.

ERICSSON / Eddy Ramírez Saucedo 2/193 18-IPB 222 SS0567L Ues


Aprobado por Rev. Fecha Archivo

ERICSSON / Walter Yong A 4/12/2020

Project: DIGICEL, LTE ROLLOUT 2020, EL SALVADOR


Site ID: SS0567L
Site Name: SAN FRANCISCO 2

3 X HBXX-6517DS-VTM
SECTOR 1 SECTOR 2 SECTOR 3

DIAGRAMA DE DISTRIBUCION
DE CABLES BB6630 LTE 1900 MHz

RET RET RET

PWR PWR PWR


OPT in OPT in OPT in
ANT A ANT A ANT A
DUW 31/WCDMA ANT B ANT B ANT B
DUG 20/GSM ANT C
ANT D
ANT C
ANT D
ANT C
ANT D
TCU 02 01
BB6630 / LTE
JUMPER JUMPER JUMPER
ROUTER 6672
CABLE FO (OIL)
CABLE DC
RBS6101 EXISTENTE
Esquemático de Conexión TX

Preparado por Documento No.

ERICSSON / Eddy Ramírez Saucedo 2/193 18-IPB 222 SS0567L Ues


Aprobado por Rev. Fecha Archivo

ERICSSON / Walter Yong A 4/12/2020

Project: DIGICEL, LTE ROLLOUT 2020, EL SALVADOR


Site ID: SS0567L
Site Name: SAN FRANCISCO 2

R6672
SAN FRANCISCO 2

RDH 102 48/7


(VERIFICAR)

1 x 1G – SFP
Bidi – 40Km 3 x 1GE
Electrical

SANTA ELENA DUG20 ID 2G 1SS567

DUW31 ID 3G SS0567

BB6630 ID 4G SS0567L
Conexión de Energía

Preparado por Documento No.

ERICSSON / Eddy Ramírez Saucedo 3/193 18-IPB 222 SS0567L Ues


Aprobado por Rev. Fecha Archivo

ERICSSON / Walter Yong A 4/12/2020

Project: DIGICEL, LTE ROLLOUT 2020, EL SALVADOR


Site ID: SS0567L
Site Name: SAN FRANCISCO 2

Existente Existente Existente Nuevo


PDU0101 PDU0104 (1) PDU0104 (2) PDU0104 (3)

1 2 3 4 5 6 7 8 9 10

SPDs

BASEBAND 6630

R4415 B2 R4415 B2 R4415 B2


Sector 1 B2 Sector 2 B2 Sector 3 B2

SPDs CABLES
Cable DC (TFL492325/)
Existente
CABLE ET20 (RPM777193/ )
Nuevo (A instalar) CABLE ET20 (RPM777528/ )
Conexión de Energía

Preparado por Documento No.

ERICSSON / Eddy Ramírez Saucedo 3/193 18-IPB 222 SS0567L Ues


Aprobado por Rev. Fecha Archivo

ERICSSON / Walter Yong A 4/12/2020

NUEVO
PDU0104 (3)

R6672

CABLES
Cable DC (TFL492325/)
CABLE ET20 (RPM777193/ )
CABLE ET20 (RPM777528/ )
Installation Checklist

Preparado por Documento No.

ERICSSON / Eddy Ramírez Saucedo 2/006 51-208-IPB 222 SS0567L Ues


Aprobado por Rev. Fecha Archivo
ERICSSON / Walter Yong A 4/12/2020

Project: DIGICEL, LTE ROLLOUT 2020, EL SALVADOR


Site ID: SS0567L
Site Name: SAN FRANCISCO 2

OK | NOK Comments
1 ANTENNA INSTALLATION
SECTOR 1
1.1 Antenna instalation according to SID
1.2 Stable pipe verified
1.3 Verified antenna bracket and proper installation
1.4 Verified proper filter installation
1.5 Radios grounded to grounding bar
1.6 Verified Downtilt (Electrical & Mechanical)
1.7 Azimuth verified
1.8 Check installation, sealing and correct tightening
Of the connectors in antennas
1.9 Verified jumpers installation
1.10 Verified jumper labeling
SECTOR 2
1.1 Antenna instalation according to SID
1.2 Stable pipe verified
1.3 Verified antenna bracket and proper installation
1.4 Verified proper filter installation
1.5 Radios grounded to grounding bar
1.6 Verified Downtilt (Electrical & Mechanical)
1.7 Azimuth verified
1.8 Check installation, sealing and correct tightening
Of the connectors in antennas
1.9 Verified jumpers installation
1.10 Verified jumper labeling
SECTOR 3
1.1
Antenna instalation according to SID
1.2
Stable pipe verified
1.3
Verified antenna bracket and proper installation
1.4
Verified proper filter installation
1.5
Radios grounded to grounding bar
1.6
Verified Downtilt (Electrical & Mechanical)
1.7
Azimuth verified
1.8
Check installation, sealing and correct tightening
Of the connectors in antennas
1.9 Verified jumpers installation
1.10 Verified jumper labeling
2 OPTICAL FIBER ROUTE AND PROPER INSTALLATION
2,.1 Verified non damaged optical fibers
2.2 Check fastening of the conduit trajectory for OIL
2.3 Check sealing of couplers and tube terminators LT
2.4 Check the placement of Tube distribution boxes LT
2.5 Check the OIL surplus arrangement
2.6 Check the OIL at the entrance of the ENC (Roxtec)
Installation Checklist

Preparado por Documento No.

ERICSSON / Eddy Ramírez Saucedo 2/006 51-208-IPB 222 SS0567L Ues


Aprobado por Rev. Fecha Archivo
ERICSSON / Walter Yong A 4/12/2020

3 BASE STATION INSTALLATION


3.1 RBS & RRU installation according to SID
3.2 Radio Installation verified
3.3 Power cable to RRU
3.4 Alarm Set-up for ENC6150
3.5 Site without alarm failure
3.6 Baterries tested
3.7 AC Power circuit testing
3.8 SCU Configured and tested
3.9 Voltage measurement in RBS and RRU
3.10 Indoor Cable labeling

4 GENERAL
3.12 Sealed conduit Optical fibel and Power Cable
3.13 Sealed Enclosure Roxtec

Checked by Ericsson

Name

Signature Date

Checked by Digicel

Name

Signature Date
Inventory 1(1)
Prepared (also subject responsible if other) No

ERICSSON / Eddy Ramírez Saucedo 4/153 11-IPB 222 SS0567L Ues


Doc respons/Approved Checked Date Rev.

ERICSSON / Walter Yong 4/12/2020 A IPB 558 SS0567L Ues

Proyecto: DIGICEL, LTE ROLLOUT 2020, EL SALVADOR


Nombre de Sitio: SAN FRANCISCO 2
ID de Sitio: SS0567L

Hoja de Inventario a ser llenada Post-Instalación


DESCRIPCIÓN CÓDIGO No. SERIE Rev FECHA
1 EQUIPPED CABINET/Enclosure 6150; AGO
2 BASEBAND 6630
3 BASEBAND 5216
4 Radio 4415 B2;Radio Unit
5 Radio 4415 B2;Radio Unit
6 Radio 4415 B2;Radio Unit
7 Radio 4415 B2;Radio Unit
8 Radio 4415 B2;Radio Unit
9 Radio 4415 B2;Radio Unit
10 ANTENNA (1900 MHz)
11 ANTENNA (1900 MHz)
12 ANTENNA (1900 MHz)
13 BATTERY
14 BATTERY
15 BATTERY
16 BATTERY
17 BATTERY
18 BATTERY
19 BATTERY
20 BATTERY
21 PDU 0104
22 PSU AC 03
23 ROUTER 6672
24 ROUTER 6672
25 ROUTER 6675
26 ROUTER 6675
27 TDM 1001
28
29
30
31
ACCEPTANCE CERTIFICATE

Preparado por Documento No.

ERICSSON / Eddy Ramírez Saucedo 2/179 61-IPB 222 SS0567L Ues


Aprobado por Rev. Fecha Archivo
ERICSSON / Walter Yong A 4/12/2020

Project: DIGICEL, LTE ROLLOUT 2020, EL SALVADOR


Site ID: SS0567L
Site Name: SAN FRANCISCO 2

DIGICEL

SAN FRANCISCO 2

SS0567L

Certificamos que Ericsson a cumplido con la instalación, integración, pruebas y documentación del sitio:
SS0567L SAN FRANCISCO 2, de acuerdo a los requerimientos de su cliente (DIGICEL) El Salvador

Referencia elaborada con las recomendaciones y documentación especificas del trabajo realizado.

Fecha

Nombre: Nombre:

Firma: Firma:

Digicel Ericsson
ABBREVIATION LIST

Preparado por Documento No.

ERICSSON / Eddy Ramírez Saucedo 006 51-IPB 222 SS0567L Ues


Aprobado por Rev. Fecha Archivo

ERICSSON / Walter Yong A 4/12/2020

Project: DIGICEL, LTE ROLLOUT 2020, EL SALVADOR


Site ID: SS0567L
Site Name: SAN FRANCISCO 2

ABBREVIATION LIST

3G Third Generation
A:DX1/DX2 Duplex antenna 1 and 2 in cell A
ACCU Alternating Current Connection Unit
ALEX Active Library Explorer
AMM Access Module Magazine
ASC Antenna System Controller
ATM Asynchronous Transfer Mode
BB Baseband
BBS Battery Backup System
BFU Battery Fuse Unit
BTF Barra de Tierra Fisica
BTS Base Transceiver Station
CBU1 Control Base Unit
CDU Combining and Distribution Unit
CGO Cama de Guia de Onda
CPU Central Processing Unit
dBm Decibel referred to milliwatt
DC Direct Current
DCCU DC Connection Unit
DCCU BOX DC Connection Unit Box
DDF Digital Distribution Frame
ddTMA Dual Duplex TMA
DDTMA Dual Duplex Tower Mounted Amplifier
DDU DC Distribution Unit
DF Distribution Frame
DHCP Distribution Frame
DRU Dynamic Host Configuration Protocol
DTMA Dual Radio Unit
dTRU Duplex Tower Mounted Amplifier
DXC duplex Transceiver Unit
DXX Digital Cross Connect
EAC Digital Cross Connect
EACU External Alarm Channel
EDGE External Alarm Connection Unit
EDT External Alarm Connection Unit
EMC Enhanced Data rates for GSM Evolution
EMI Electrical Down Tilt
ESB Electromagnetic Compatibility
ESD Electromagnetic Interference
ESB External Synchronization Bus
FCU Fan Control Unit
FTP File Transfer Protocol
FU Filter Unit
GPRS General Packet Radio Service
GPS Global Positioning System
HLR Home Location Register
HLS Higher Layer Scheduling
HMAC Hashed Message Authentication Code
HN Home Network
HO Handover
HP High Power
ABBREVIATION LIST

Preparado por Documento No.

ERICSSON / Eddy Ramírez Saucedo 006 51-IPB 222 SS0567L Ues


Aprobado por Rev. Fecha Archivo

ERICSSON / Walter Yong A 4/12/2020

Project: DIGICEL, LTE ROLLOUT 2020, EL SALVADOR


Site ID: SS0567L
Site Name: SAN FRANCISCO 2

ht.a.fl.l Height above floor level


HTTP Hypertext Transfer Protocol
ID Identifier
IP Internet Protocol
LTU Line Terminal Unit
m a.g.l. Metre above ground level
MET Main Earth Terminal
MMU Modem Unit
MSC Mobile Services Switching Center
MU Main Unit
MUX Multiplexer
NCC Node Communication Channel
NPU Node Processor Unit
NTP Network Time Protocol
OBIF Optical Baseband Interface
OIL Optical interface link
OM Operation(s) and Maintenance
OMINF Operation and Maintenance INFrastructure
OVP Overvoltage Protection
PBC-05 Power Battery Cabinet
PCM Pulse Code Modulation
PDU Power Distribution Unit
PFU Power Filter Unit
RAU Radio Unit
RAX Random Access and Receiver
RBS Radio Base Station
RD Receive Data
RRU Remote Radio Unit
RX Receiver
SAU Service Access Unit
SMU Switch Multiplexer Unit
SSU Site Solution Unit
TD Transmit Data
TEMS Test Mobile System
TMA Tower Mounted Amplifier
TMR Transmission Rack
TPU Transient Protection Unit
TRP Transceiving Receiving Processing
TRU Transceiver Unit
TRX Transceiver
TU Transceiver Unit
TX Transmitter
UDTS Unitdata Service
UMTS Universal Mobile Telecommunications System
VPN Virtual Private Network
VSWR Voltage Standing Wave Ratio
WCDMA Wideband Code Division Multiple Access
WWW World Wide Web
XALM External Alarm Unit
XML Extensible Markup Language
XALM External Alarm Unit
XML Extensible Markup Language
ANNEXES

Preparado por Documento No.

ERICSSON / Eddy Ramírez Saucedo 006 51-IPB 222 SS0567L Ues


Aprobado por Rev. Fecha Archivo

ERICSSON / Walter Yong A 4/12/2020


HBXX-6517DS-VTM | HBXX-6517DS-A2M

4-port sector antenna, 4x 1710–2180 MHz, 65° HPBW, RET


compatible

Superior azimuth tracking and pattern symmetry with excellent passive intermodulation
suppression

General Specifications
Antenna Type Sector

Band Single band

Color Light gray

Grounding Type RF connector inner conductor and body grounded to reflector and
mounting bracket

Performance Note Outdoor usage

Radome Material PVC, UV resistant

Radiator Material Low loss circuit board

RF Connector Interface 7-16 DIN Female

RF Connector Location Bottom

RF Connector Quantity, high band 4

RF Connector Quantity, total 4

Remote Electrical Tilt (RET) Information, General


Model with Factory Installed AISG 2.0 Actuator HBXX-6517DS-A2M

Dimensions
Width 305 mm   |   12.008 in

Length 1906 mm   |   75.039 in

Depth 166 mm   |   6.535 in

Electrical Specifications
Impedance 50 ohm

Operating Frequency Band 1710 – 2180 MHz

Polarization ±45°

Page 1 of 3

©2020 CommScope, Inc. All rights reserved. All trademarks identified by ® or ™ are registered trademarks,
respectively, of CommScope. All specifications are subject to change without notice. See www.commscope.com for the
most current information. Revised: September 18, 2020
HBXX-6517DS-VTM | HBXX-6517DS-A2M
Electrical Specifications
Frequency Band, MHz 1710–1880 1850–1990 1920–2180
Gain, dBi 19 19.1 19.2
Beamwidth, Horizontal, degrees 67 66.3 64.9
Beamwidth, Vertical, degrees 5 4.7 4.4
Beam Tilt, degrees 0–6 0–6 0–6
USLS (First Lobe), dB 18 18 18
Front-to-Back Ratio at 180°, dB 30 30 30
CPR at Boresight, dB 21 22 21
CPR at Sector, dB 10.3 11 9
Isolation, Cross Polarization, dB 30 30 30
VSWR | Return loss, dB 1.4 | 15.6 1.4 | 15.6 1.4 | 15.6

PIM, 3rd Order, 2 x 20 W, dBc -153 -153 -153


Input Power per Port, maximum, watts 350 350 350

Electrical Specifications, BASTA


Frequency Band, MHz 1710–1880 1850–1990 1920–2180
Gain by all Beam Tilts, average, dBi 18.5 18.6 18.8
Gain by all Beam Tilts Tolerance, dB ±0.4 ±0.3 ±0.4
Gain by Beam Tilt, average, dBi 0 ° | 18.4 0 ° | 18.4 0 ° | 18.7
3 ° | 18.7 3 ° | 18.7 3 ° | 18.9
6 ° | 18.4 6 ° | 18.5 6 ° | 18.6

Beamwidth, Horizontal Tolerance, degrees ±2.4 ±1.7 ±2.9


Beamwidth, Vertical Tolerance, degrees ±0.3 ±0.3 ±0.3
USLS, beampeak to 20° above beampeak, dB 18 19 19
Front-to-Back Total Power at 180° ± 30°, dB 25.2 25.9 26.3
CPR at Boresight, dB 22 23 22
CPR at Sector, dB 10 10 9

Mechanical Specifications
Wind Loading at Velocity, frontal 153.1 lbf @ 150 km/h    |   668.0 N @ 150 km/h

Wind Loading at Velocity, lateral 175.0 N @ 150 km/h    |   39.3 lbf @ 150 km/h

Wind Loading at Velocity, rear 174.7 lbf @ 150 km/h    |   777.0 N @ 150 km/h

Wind Speed, maximum 241 km/h   |   149.75 mph

Packaging and Weights


Page 2 of 3

©2020 CommScope, Inc. All rights reserved. All trademarks identified by ® or ™ are registered trademarks,
respectively, of CommScope. All specifications are subject to change without notice. See www.commscope.com for the
most current information. Revised: September 18, 2020
HBXX-6517DS-VTM | HBXX-6517DS-A2M
Width, packed 402 mm   |   15.827 in

Depth, packed 292 mm   |   11.496 in

Length, packed 2036 mm   |   80.158 in

Net Weight, without mounting kit 18.5 kg   |   40.785 lb

Weight, gross 28.2 kg   |   62.17 lb

Regulatory Compliance/Certifications
Agency Classification
CE Compliant with the relevant CE product directives
CHINA-ROHS Below maximum concentration value
ISO 9001:2015 Designed, manufactured and/or distributed under this quality management system
REACH-SVHC Compliant as per SVHC revision on www.commscope.com/ProductCompliance
ROHS Compliant

Included Products
600899A-2 — Downtilt Mounting Kit for 2.4 - 4.5 in (60 - 115 mm) OD round members. Kit contains one scissor top bracket set and one
bottom bracket set.

* Footnotes
Performance Note Severe environmental conditions may degrade optimum performance

Page 3 of 3

©2020 CommScope, Inc. All rights reserved. All trademarks identified by ® or ™ are registered trademarks,
respectively, of CommScope. All specifications are subject to change without notice. See www.commscope.com for the
most current information. Revised: September 18, 2020
4 3 2 1
REVISIONS
NOTES:
REV DESCRIPTION DATE APPROVED
A ECR 5083344: REL TO PRODUCTION. EE: MLZ ME: TV 21NOV08 TZ TV/MLZ
H ECR 8000001394: UPDATE DRAWING. 09SEP13 K.W S.LIU/JIHE
J ECR 8000002280: UPDATE DRAWING. 21JAN14 DYT S.LIU/JIHE

D K ECR 8000005559: ADD DXF FILE. 27OCT14 QF S.LIU/JIHE D


L ECR 8000006209: UPDATE DRAWING WITH LATEST MODEL. 25DEC14 AD S.LIU/JIHE

1906.4 33.3

166.1 34.2 46.9


C C
4X 9.2 HOLES 1232.0 175.7
THIRD ANGLE PROJECTION

305.0

83.2
(INSIDE)
B B

HBXX-6517DS-VTM
HBXX-6517DST-VTM

UNLESS OTHERWISE SPECIFIED


MATERIAL DENSITY: DIMENSIONS ARE IN MILLIMETERS
INTERPRET PER ISO STANDARDS WESTCHESTER, IL. 60154
N/A MASS: HANDBOOK,TECHNICAL DRAWINGS, U.S.A.
VOLUMES 1 & 2, THIRD EDITION (2002) R

TOLERANCES THIRD ANGLE PROJECTION


PRODUCT DRAWING
A 0 PLACE X± A
FINISH
1 PLACE .X ±
N/A DRAWN BY TZ
SIZE CAGE CODE DOCUMENT NO.
2 PLACE .XX ± 21NOV08
ANGLES ± ECN 8000006209-O A2 84147 HBXX-6517DS-VTM-L
ALL SURFACES AUTH. GROUP 23 MODEL DRAWING
SHEET
NOTICE: These drawings and specifications are the proprietary property of ANDREW CORPORATION VERSION STATUS REVISION VERSION STATUS REVISION
and may be used only for the specific purpose authorized in writing by Andrew. 09 RE K 10 RE L 1 OF 3

4 3 THIRD ANGLE PROJECTION 2 1

También podría gustarte