Está en la página 1de 16

Determinación de los límites de consistencia

No golpes 38 26 12
Wrmh (g) 65.22 59.48 58.78
Wrms (g) 60 54.96 53.91
Wr (g) 27.93 28.92 28.54
Humedad (%) 16.3 17.4 19.2

Determinación del límite Plástico


Wrmh (g) 48.56 45.53
Wrms (g) 45.89 43.45
Wr (g) 27.85 28.51
Humedad (%) 14.8 13.9

22.0
CONTENIDO DE HUMEDAD

21.0

20.0

19.0

18.0

17.0

16.0

15.0
)%(

14.0
5 50

NUMERO DE GOLPES

LL 17.38 %
LP 14.4 %
IP 3.0 %

Masa inicial seca sin lavar 5250 g

Abertura del Tamiz


Masa Retenida %Retenido

[mm] [in] [g]


19 3/4" 0 0
12.5 1/2" 578 11
9.5 3/8" 315 6
4.75 No. 4 473 9
2 10 609 11.6
1.1 No. 16 709 13.5
0.425 No. 40 457 8.7
0.3 No. 50 263 5
0.15 No. 100 294 5.6
0.075 200 872 16.6
0.075 Pasa 200 683 13

Curva Granulométrica

100.0

90.0

80.0

70.0

60.0
)%( PASA

50.0

40.0

30.0

20.0

10.0

0.0
100.000 10.000 1.000 0.100

TAMIZ (mm)

Cu 27.69 Gravas
Cc 0.22 Arenas
D60: 1.80 Finos
D30: 0.16 TM
D10: 0.065 T.M.N

CLASIFICACIÓN SUCS
% RET No. 200 87 %
% RET No. 4 26 %
Suelo de Grano Grueso: Más de 50% retenido en el tamiz No 200
Arena: 50% O MÁS DE LA FRACCIÓN GRUESA PASA TAMIZ No. 4
SE CLASIFICA COMO ARENA
% FINOS 13 %
Arena con Finos: Más de 12% de Finos
IP 3
SM
LL 17
SMd
CLASIFICACIÓN AASHTO
% FINOS 13 %
% PASA No 10 62 %
% PASA No 40 40 %
% PASA No 200 13 %
LL 17
IP 3
CLASIFICACIÓN AASHTO A-1-B IG = 0

VERIFICACIÓN
[mm] [in]
19 3/4" 0 0.00
12.5 1/2" 578 11.00
9.5 3/8" 315 6.00
4.75 No. 4 473 9.00
2 10 609 11.60
1.1 No. 16 709 13.50
0.425 No. 40 457 8.70
0.3 No. 50 263 5.00
0.15 No. 100 294 5.60
0.075 200 872 16.60
0.075 Pasa 200 683 13.00
x y Golpes Humedades
25.0 0 38.00 0.16277
25.0 17.3760712 26.00 0.17358
12.00 0.19196
x y
0 17.3760712
25.0 17.3760712

Y=mx+b

b=

Porcentaje
Porcentaje
Retenido m=
Pasa
Acum.

[%] [%] Y=
0 100 PARA 25 GOLPES, W =
11 89
17 83
26 74
37.6 62.4
51.1 48.9
59.8 40.2
64.8 35.2
70.4 29.6
87 13
100

0.100 0.010

26.0 %
61.0 %
13.0 %
3/4"
1/2"
0 100
11.00 89.00
17.00 83
26.00 74
37.60 62.4
51.10 48.90
59.80 40.2
64.80 35.2
70.40 29.6
87.00 13
100.00 0
GOLPES HUMEDAD GRAFICO DE CLASIFICACION
1.579783597 0.16277
LINEA
1.414973348 0.17358 50 25 8
1.079181246 0.19196 15.64505395 17.37607124 20.22161472

1.079181246 0.19196 CUADRO


25 25

-2.0 17.37607124
0.254146666 5 25

-0.05750315
17.3760712 17.3760712
0.173760712
17.4
TAMIZ ARTICULO 330: ARTICULO 330:
PULGADA mm TABLA 330-3 BG-25 TABLA 330-3 BG-27
3" 76.1 100 100 100 100
2 ½" 64.00 100 100 100 100
2" 50.80 100 100 100 100
1 ½" 38.10 100 100 100 100
1" 25.40 70 100 100 100
3/4" 19.00 60 90 75 100
3/8" 9.51 45 75 52 78
No. 4 4.76 30 60 35 59
No.10 2.00 20 45 20 40
No. 40 0.42 10 30 8 22
No. 200 0.074 5 15 0 9

Curva Granulométrica - BG 25

100.0

90.0
Crudo de Río
80.0 Banda BG - Rama
Gruesa
70.0 Banda Bg - Rama Fina
60.0
)%( PASA

50.0

40.0

30.0

20.0

10.0

0.0
100.000 10.000 1.000 0.100 0.010

TAMIZ (mm)

Curva Granulométrica - BG 25

100.0

90.0
Crudo de Río
80.0 Column F
70.0 Column G

60.0
)%( PASA

50.0

40.0

30.0

20.0

10.0

0.0
100.000 10.000 1.000 0.100 0.010

TAMIZ (mm)
TAMIZ (mm)

TAMIZ Curva Granulométrica - SBG 38


ARTICULO 320-13: 100.0
PULGADA mm TABLA 320-3 SBG-38
90.0

3" 76.1 100 100 80.0

2 ½" 64.00 100 100 70.0


2" 50.80 100 100 60.0
1 ½" 38.10 100 100

)%( PASA
50.0
1" 25.40 75 95
40.0
1/2" 12.50 55 85
30.0
3/8" 9.51 45 75
30 60 20.0
No. 4 4.76
No.10 2.00 20 45 10.0

No. 40 0.42 8 30 0.0


2 15 100.000 10.000 1.000
No. 200 0.074

TAMIZ Curva Granulomé


AF-25
PULGADA mm 100.0
3" 76.1 100 100 90.0
2 ½" 64.00 100 100
80.0
2" 50.80 100 100
70.0
1 ½" 38.10 100 100
60.0
1" 25.40 100 100
)%( PASA

90 100 50.0
3/4" 19.00
3/8" 9.51 65 90 40.0

No. 4 4.76 45 70 30.0

No.10 2.00 35 55 20.0


No. 40 0.42 15 35 10.0
No. 200 0.074 10 20
0.0
100.000 10.000

CANTERA BG BG BG SBG SBG


RÍO CLASE A CLASE B CLASE C CLASE A CLASE B
LL (MÁX) 17 NL NL 25 25 25
LP 14
IP (MÁX) 3 NP NP 3 6 6
TAMIZ
% PASA
PULGADA mm
3" 76.1 100
2 ½" 64.00 100
2" 50.80 100
1 ½" 38.10 100
1" 25.40 100
3/4" 19 100
1/2" 12.50 89.00
3/8" 9.50 83.00
No. 4 4.75 74.00
10 2.00 62.40
No. 16 1.10 48.90
No. 40 0.43 40.20
No. 50 0.30 35.20
No. 100 0.15 29.60
200 0.08 13.00

ío
- Rama

Rama Fina

0.010

de Río
nF
nG

0.010
Curva Granulométrica - SBG 38

Crudo de Río
BANDAS SBG 38
BANDAS SBG 38

1.000 0.100 0.010

TAMIZ (mm)

Curva Granulométrica - A 25

Crudo de Río
Column C
Column D

10.000 1.000 0.100 0.010

TAMIZ (mm)

SBG
AF
CLASE C
25 40

64-9
Ensayo de compactación Proctor modificado
Humedad óptima
Volumen molde cm3
Masa material humeda compactada en molde g
Gravedad especifica (Gs)

Densidad mh
Densidad ms 1.97 100% 9%
Densidad ms 98% 1.93 98% 9%
Densidad ms 90% 1.76 90% 9%

Densidad seca vs % Ѡ
2.00 2.50

1.95
2.00
1.90

1.85 1.50

δmsh
δmsh

1.80
1.00
1.75

1.70
0.50
1.65

1.60 0.00
8% 9% 10% 0% 10% 20% 3

No. Golpes e
12 0.52
26 0.41
55 0.18

Expensión
0.60

0.50 f(x) = − 0.007857142857143 x + 0.614285714285714


R² = 1
0.40

0.30
e

0.20

0.10

-
10 12 14 16 18 20 22 24 26 28
No. de golpes
0.40

0.30

e
0.20

0.10

-
10 12 14 16 18 20 22 24 26 28
No. de golpes
Penetración Esfuerzo del material (psi)
in 55 golpes/capa 26 golpes/capa 12 golpes/capa
0.1 850 560 245 85% 56% 25%
0.2 1380 720 396 92% 48% 26%
e 0.41 0.52 92% 56% 26%
55 26 12

CBR
92%
56% 0%
26% 11%

m
b
Relación de CBR
2.50
x

2.00 x
f(x) = 0.319976774066021 x + 1.69918683534295
R² = 0.843371143363542 0
1.50 72%
δmsh

1.00
72%
72%

0.50

0.00 0
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
CBR
10

m -0.0078571429
b 0.61428571429

x y
0
0.31997677
1.69918684

72%

y
1.93
1.93

0
1.93

1.93
1.93

También podría gustarte