Está en la página 1de 16

MUNICIPALIDAD DISTRITAL DE NUEVO CHIMBOTE

MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD EN LAS ZONAS SEMI-URBANA PRIMERA Y SEGUNDA ETAPA
NUCLEO URBANO BUENOS AIRES,CENTRO POBLADO DE BUENOS AIRES-DISTRITO DE NUEVO CHIMBOTE-PROVINCIA
2398393
------------------------------------------------------------------------------------------------------------------------------------------------
CRONOGRAMA VALORIZADO DE AVANCE
FECHA: JULIO 2018

"MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD EN LAS ZONAS SEMI-URBANA PRIMERA Y SEGUNDA ETAPA Y SEMI-R
Obra : URBANO BUENOS AIRES,CENTRO POBLADO DE BUENOS AIRES-DISTRITO DE NUEVO CHIMBOTE-PROVINCIA DE SANTA-REGION A

Cliente : MUNICIPALIDAD DISTRITAL DE NUEVO CHIMBOTE


Ubicación :BUENOS AIRES

PRESUPUESTO

CODIGO RECURSO
Und. Metrado Precio (S/.)

01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA (GIGANTOGRAFIA 7.20X4.80) und 2.00 S/. 1,634.24
01.02 OFICINA, ALMACEN Y CASETA DE GUARDIANIA mes 3.00 S/. 700.00
02 TRABAJOS PRELIMINARES
02.01 MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL GLB 1.00 S/. 3,903.40
02.02 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS, MAQUINARIAS Y HERRAMIENTAS GLB 1.00 S/. 1,595.00
02.03 LIMPIEZA DE TERRENO MANUAL m2 6800.20 S/. 0.50
02.04 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 6800.20 S/. 1.55
02.05 RETIRO DE CARPETA ASFALTICA EXISTENTE DETERIORADO E=2" m2 6295.48 S/. 2.56
03 MOVIMIENTO DE TIERRAS
03.01 CORTE EN TERRENO NORMAL HASTA NIVEL DE SUBRASANTE m3 2606.00 S/. 5.78
03.02 CONFORMACIÓN DE SUBRASANTE m2 6800.20 S/. 2.38
03.03 ELIMINACIÓN DE MATERIAL EXCEDENTE CON MAQUINARIA m3 3504.93 S/. 14.81
04 PAVIMENTO FLEXIBLE
04.01 SUB BASE AFIRMADO E=0.20M m2 6800.20 S/. 10.09
04.02 BASE AFIRMADO E=0.15M m2 6800.20 S/. 8.47
04.03 IMPRIMACIÓN ASFALTICA CON MC-30 m2 6800.20 S/. 4.01
04.04 CARPETA ASFALTICA EN CALIENTE DE 2" m2 6800.20 S/. 31.68
04.05 REDUCTORES DE VELOCIDAD
MUNICIPALIDAD DISTRITAL DE NUEVO CHIMBOTE
MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD EN LAS ZONAS SEMI-URBANA PRIMERA Y SEGUNDA ETAPA
NUCLEO URBANO BUENOS AIRES,CENTRO POBLADO DE BUENOS AIRES-DISTRITO DE NUEVO CHIMBOTE-PROVINCIA
2398393
------------------------------------------------------------------------------------------------------------------------------------------------
CRONOGRAMA VALORIZADO DE AVANCE
FECHA: JULIO 2018

"MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD EN LAS ZONAS SEMI-URBANA PRIMERA Y SEGUNDA ETAPA Y SEMI-R
Obra : URBANO BUENOS AIRES,CENTRO POBLADO DE BUENOS AIRES-DISTRITO DE NUEVO CHIMBOTE-PROVINCIA DE SANTA-REGION A

Cliente : MUNICIPALIDAD DISTRITAL DE NUEVO CHIMBOTE


Ubicación :BUENOS AIRES

PRESUPUESTO

CODIGO RECURSO
Und. Metrado Precio (S/.)

04.05.01 IMPRIMACIÓN ASFALTICA CON MC-30 m2 47.52 S/. 4.01


04.05.02 REDUCTORES DE VELOCIDAD DE ASFALTO EN CALIENTE und 5.00 S/. 752.73
04.06 SEÑALIZACIÓN DE TRANSITO
04.06.01 TRAZO DE LINEAS (CONTINUAS Y DISCONTINUAS) m 2164.40 S/. 1.01
04.06.02 TRAZO DE SIMBOLOS (PEATONALES Y DIRECCIONALES) m2 165.11 S/. 2.29
04.06.03 PINTADO DE PAVIMENTO (LINEA CONTINUA Y DESCONTINUA) m 2164.40 S/. 1.84
04.06.04 PINTADO DE PAVIMENTOS (PEATONALES Y DIRECCIONALES) m2 165.11 S/. 15.73
04.06.05 PINTADO DE PAVIMENTOS (REDUCTORES DE VELOCIDAD) m2 26.16 S/. 15.73
04.06.06 SUMINISTRO E INSTALACION DE TACHAS REFLECTIVAS 10cmx10cmx16.7mm und 321.00 S/. 13.37
04.06.07 SUMINISTRO E INSTALACION DE TACHONES REFLECTIVOS COLOR AMARILLO DE 20x10x5cm und 198.00 S/. 37.61
05 PAVIMENTO RIGIDO
05.01 BASE DE AFIRMADO E=0.15 M. m2 2629.47 S/. 8.51
05.02 ADOQUINES DE CONCRETO COLOR ROJO E=8CM TIPO II (20x10x8cm) m2 2629.47 S/. 64.57
05.03 VARIOS
05.03.01 PICADO Y/O ENCIMADO DE CUERPO DE BUZONES EXISTENTES und 15.00 S/. 206.33
05.03.02 MURETE DE CONCRETO ARMADO F´C=175 kg/cm2 REVESTIDO DE GRANITO CON PLACA RECORDATORIA und 1.00 S/. 1,764.08
06.01 VEREDAS
06 TRABAJOS PRELIMINARES
06.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 3474.70 S/. 1.55
MUNICIPALIDAD DISTRITAL DE NUEVO CHIMBOTE
MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD EN LAS ZONAS SEMI-URBANA PRIMERA Y SEGUNDA ETAPA
NUCLEO URBANO BUENOS AIRES,CENTRO POBLADO DE BUENOS AIRES-DISTRITO DE NUEVO CHIMBOTE-PROVINCIA
2398393
------------------------------------------------------------------------------------------------------------------------------------------------
CRONOGRAMA VALORIZADO DE AVANCE
FECHA: JULIO 2018

"MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD EN LAS ZONAS SEMI-URBANA PRIMERA Y SEGUNDA ETAPA Y SEMI-R
Obra : URBANO BUENOS AIRES,CENTRO POBLADO DE BUENOS AIRES-DISTRITO DE NUEVO CHIMBOTE-PROVINCIA DE SANTA-REGION A

Cliente : MUNICIPALIDAD DISTRITAL DE NUEVO CHIMBOTE


Ubicación :BUENOS AIRES

PRESUPUESTO

CODIGO RECURSO
Und. Metrado Precio (S/.)

06.01.02 DEMOLICION DE VEREDAS EXISTENTES C/MAQUINARIA m2 2113.72 S/. 9.10


06.01.03 LIMPIEZA DE TERRENO MANUAL m2 3474.70 S/. 0.50
06.02 MOVIMIENTO DE TIERRAS
06.02.01 CORTE SUPERFICIAL MANUAL HASTA NIVEL DE SUBRASANTE m3 694.94 S/. 28.07
06.02.02 NIVELACION Y COMPACTACION DE SUBRASANTE m2 3474.70 S/. 2.63
06.02.03 AFIRMADO DE 4" PARA VEREDAS m2 3474.70 S/. 10.21
06.02.04 ELIMINACIÓN DE MATERIAL EXCEDENTE CON MAQUINARIA m3 1087.57 S/. 14.81
06.03 CONCRETO SIMPLE
06.03.01 CONCRETO EN VEREDAS Y RAMPAS F'C=175 KG/CM2, E=4" INCL. ACABADO PULIDO m2 3474.70 S/. 38.72
06.03.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 685.47 S/. 36.20
06.04 JUNTAS DE DILATACION
06.04.01 JUNTA DE DILATACIÓN ASFALTICA E=1" PARA VEREDAS m 1043.09 S/. 1.88
06.05 RAMPAS EN MARTILLOS
06.05.01 ENCOFRADO Y DESENCOFRADO EN RAMPAS m2 8.00 S/. 22.35
06.05.02 CONCRETO EN RAMPAS (UÑAS), F´C=175 kg/cm2 m3 0.64 S/. 355.56
06.05.03 CONCRETO EN RAMPAS FC=175 kg/cm2, E=10cm, INCL. ACABADO PULIDO Y BRUÑADO m2 48.00 S/. 38.72
06.06 OTROS
06.06.01 CURADO DE VEREDAS (INC. ARROCERAS) m2 3522.70 S/. 1.82
06.06.02 NIVELACIÓN DE CAJAS DE AGUA und 61.00 S/. 16.20
MUNICIPALIDAD DISTRITAL DE NUEVO CHIMBOTE
MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD EN LAS ZONAS SEMI-URBANA PRIMERA Y SEGUNDA ETAPA
NUCLEO URBANO BUENOS AIRES,CENTRO POBLADO DE BUENOS AIRES-DISTRITO DE NUEVO CHIMBOTE-PROVINCIA
2398393
------------------------------------------------------------------------------------------------------------------------------------------------
CRONOGRAMA VALORIZADO DE AVANCE
FECHA: JULIO 2018

"MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD EN LAS ZONAS SEMI-URBANA PRIMERA Y SEGUNDA ETAPA Y SEMI-R
Obra : URBANO BUENOS AIRES,CENTRO POBLADO DE BUENOS AIRES-DISTRITO DE NUEVO CHIMBOTE-PROVINCIA DE SANTA-REGION A

Cliente : MUNICIPALIDAD DISTRITAL DE NUEVO CHIMBOTE


Ubicación :BUENOS AIRES

PRESUPUESTO

CODIGO RECURSO
Und. Metrado Precio (S/.)

06.06.03 NIVELACIÓN DE CAJAS DE DESAGUE und 61.00 S/. 18.74


06.07 PINTURA
06.07.01 PINTURA DE TRAFICO EN BORDE DE VEREDAS m2 573.44 S/. 10.40
01 SARDINELES
01.01 SARDINELES SUMERGIDOS
01.01.01 TRABAJOS PRELIMINARES
01.01.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 285.05 S/. 1.55
01.01.01.02 LIMPIEZA DE TERRENO MANUAL m2 285.05 S/. 0.50
01.01.01.03 DEMOLICION DE SARDINELES PERALTADOS EXISTENTES m3 69.24 S/. 67.13
01.01.02 MOVIMIENTO DE TIERRAS
01.01.02.01 EXCAVACION MANUAL DE ZANJA PARA SARDINELES m3 151.90 S/. 28.07
01.01.02.02 ELIMINACIÓN DE MATERIAL EXCEDENTE CON MAQUINARIA m3 265.36 S/. 14.81
01.01.03 CONCRETO ARMADO
01.01.03.01 CONCRETO EN SARDINEL SUMERGIDO F'C=175 KG/CM2 m3 114.02 S/. 355.56
01.01.03.02 ENCOFRADO Y DESENCOFRADO EN SARDINEL SUMERGIDO EN PISTA m2 1519.10 S/. 38.01
01.01.03.03 ACERO DE REFUERZO FY=4200 KG/CM2 PARA SARDINELES SUMERGIDOS kg 3588.53 S/. 4.47
01.01.04 JUNTAS DE DILATACION
01.01.04.01 JUNTA DE DILATACIÓN E=1" PARA SARDINELES m2 25.74 S/. 8.52
01.01.05 PINTURA
MUNICIPALIDAD DISTRITAL DE NUEVO CHIMBOTE
MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD EN LAS ZONAS SEMI-URBANA PRIMERA Y SEGUNDA ETAPA
NUCLEO URBANO BUENOS AIRES,CENTRO POBLADO DE BUENOS AIRES-DISTRITO DE NUEVO CHIMBOTE-PROVINCIA
2398393
------------------------------------------------------------------------------------------------------------------------------------------------
CRONOGRAMA VALORIZADO DE AVANCE
FECHA: JULIO 2018

"MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD EN LAS ZONAS SEMI-URBANA PRIMERA Y SEGUNDA ETAPA Y SEMI-R
Obra : URBANO BUENOS AIRES,CENTRO POBLADO DE BUENOS AIRES-DISTRITO DE NUEVO CHIMBOTE-PROVINCIA DE SANTA-REGION A

Cliente : MUNICIPALIDAD DISTRITAL DE NUEVO CHIMBOTE


Ubicación :BUENOS AIRES

PRESUPUESTO

CODIGO RECURSO
Und. Metrado Precio (S/.)

01.01.05.01 PINTURA DE TRAFICO EN BORDE DE SARDINEL SUMERGIDO m2 257.42 S/. 14.36


02 JARDINERA PERALTADA DE CONCRETO F´c=175kg/cm2, H= 15CM
02.01 TRABAJOS PRELIMINARES
02.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 60.89 S/. 1.55
02.01.02 LIMPIEZA DE TERRENO MANUAL m2 60.89 S/. 0.50
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL DE ZANJA PARA JARDINERAS m3 44.65 S/. 31.58
02.02.02 ELIMINACIÓN DE MATERIAL EXCEDENTE CON MAQUINARIA m3 53.58 S/. 13.55
02.03 CONCRETO ARMADO
02.03.01 CONCRETO F'C=175 KG/CM2 PARA SARDINELES PERALTADO EN JARDINERAS.(INCL.ADITIVO IMPERMEABILIZANTE.) m3 33.49 S/. 391.30
02.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN SARDINELES PERALTADOS DE JARDINERAS m2 446.49 S/. 48.24
02.03.03 ACERO DE REFUERZO FY=4200 KG/CM2 EN SARDINEL DE JARDINERA kg 877.14 S/. 4.47
02.03.04 PINTURA
02.03.04.01 PINTURA DE TRAFICO EN BORDE DE SARDINEL DE JARDINERA, H= 15CM m2 121.77 S/. 14.41
03 AREAS VERDES
03.01 MOVIMIENTO DE TIERRAS
03.01.01 REUBICACION DE ARBOLES EXISTENTES und 8.00 S/. 25.97
03.01.02 MEJORAMIENTO DE TERRENO CON MATERIAL ORGANICO m2 6.40 S/. 5.06
03.01.03 PREPARACIÓN DE TERRENO PARA SEMBRADO m2 6.40 S/. 2.40
MUNICIPALIDAD DISTRITAL DE NUEVO CHIMBOTE
MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD EN LAS ZONAS SEMI-URBANA PRIMERA Y SEGUNDA ETAPA
NUCLEO URBANO BUENOS AIRES,CENTRO POBLADO DE BUENOS AIRES-DISTRITO DE NUEVO CHIMBOTE-PROVINCIA
2398393
------------------------------------------------------------------------------------------------------------------------------------------------
CRONOGRAMA VALORIZADO DE AVANCE
FECHA: JULIO 2018

"MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD EN LAS ZONAS SEMI-URBANA PRIMERA Y SEGUNDA ETAPA Y SEMI-R
Obra : URBANO BUENOS AIRES,CENTRO POBLADO DE BUENOS AIRES-DISTRITO DE NUEVO CHIMBOTE-PROVINCIA DE SANTA-REGION A

Cliente : MUNICIPALIDAD DISTRITAL DE NUEVO CHIMBOTE


Ubicación :BUENOS AIRES

PRESUPUESTO

CODIGO RECURSO
Und. Metrado Precio (S/.)

03.01.04 CONSERVACIÓN Y RIEGO DE JARDINES HASTA ENTREGA DE OBRA GLB 1.00 S/. 652.64

COSTO DIRECTO
GASTOS GENERALES (10.00 %) 0.100
UTILIDAD (10%) 0.100
SUB TOTAL
IGV (18%) 0.180
TOTAL PRESUPUESTO
% AVANCE MENSUAL PARCIAL
% AVANCE MENSUAL ACUMULADO
LIDAD DISTRITAL DE NUEVO CHIMBOTE
AS SEMI-URBANA PRIMERA Y SEGUNDA ETAPA Y SEMI-RUSTICA PRIMERA Y SEGUNDA ETAPA DEL "
ES-DISTRITO DE NUEVO CHIMBOTE-PROVINCIA DE SANTA-REGION ANCASH". I ETAPA-CODIGO UNIFICADO N°
2398393
-----------------------------------------------------------------------------------------------------------------
A VALORIZADO DE AVANCE DE OBRA
FECHA: JULIO 2018

-URBANA PRIMERA Y SEGUNDA ETAPA Y SEMI-RUSTICA PRIMERA Y SEGUNDA ETAPA DEL NUCLEO
EVO CHIMBOTE-PROVINCIA DE SANTA-REGION ANCASH". I ETAPA-CODIGO UNIFICADO N° 2398393

PRESUPUESTO 90 dias calendarios

MES 1 MES 2 MES 3 Total (S/.)


Parcial (S/.)
Parcial (S/.) Parcial (S/.) Parcial (S/.)

S/. 3,268.48 S/. 3,268.48 S/. - S/. - S/. 3,268.48


S/. 2,100.00 S/. 2,100.00 S/. - S/. - S/. 2,100.00

S/. 3,903.40 S/. 1,439.10 S/. 1,397.99 S/. 1,066.31 S/. 3,903.40
S/. 1,595.00 S/. 1,595.00 S/. - S/. - S/. 1,595.00
S/. 3,400.10 S/. 3,400.10 S/. - S/. - S/. 3,400.10
S/. 10,540.31 S/. 10,540.31 S/. - S/. - S/. 10,540.31
S/. 16,116.43 S/. 16,116.43 S/. - S/. - S/. 16,116.43

S/. 15,062.68 S/. 15,062.68 S/. - S/. - S/. 15,062.68


S/. 16,184.48 S/. 16,184.48 S/. - S/. - S/. 16,184.48
S/. 51,908.01 S/. 51,908.01 S/. - S/. - S/. 51,908.01

S/. 68,614.02 S/. 68,614.02 S/. - S/. - S/. 68,614.02


S/. 57,597.69 S/. 57,597.69 S/. - S/. - S/. 57,597.69
S/. 27,268.80 S/. - S/. 27,268.80 S/. - S/. 27,268.80
S/. 215,430.34 S/. - S/. 215,430.34 S/. - S/. 215,430.34
LIDAD DISTRITAL DE NUEVO CHIMBOTE
AS SEMI-URBANA PRIMERA Y SEGUNDA ETAPA Y SEMI-RUSTICA PRIMERA Y SEGUNDA ETAPA DEL "
ES-DISTRITO DE NUEVO CHIMBOTE-PROVINCIA DE SANTA-REGION ANCASH". I ETAPA-CODIGO UNIFICADO N°
2398393
-----------------------------------------------------------------------------------------------------------------
A VALORIZADO DE AVANCE DE OBRA
FECHA: JULIO 2018

-URBANA PRIMERA Y SEGUNDA ETAPA Y SEMI-RUSTICA PRIMERA Y SEGUNDA ETAPA DEL NUCLEO
EVO CHIMBOTE-PROVINCIA DE SANTA-REGION ANCASH". I ETAPA-CODIGO UNIFICADO N° 2398393

PRESUPUESTO 90 dias calendarios

MES 1 MES 2 MES 3 Total (S/.)


Parcial (S/.)
Parcial (S/.) Parcial (S/.) Parcial (S/.)

S/. 190.56 S/. - S/. 190.56 S/. - S/. 190.56


S/. 3,763.65 S/. - S/. 2,117.05 S/. 1,646.60 S/. 3,763.65

S/. 2,186.04 S/. - S/. 2,049.41 S/. 136.63 S/. 2,186.04


S/. 378.10 S/. - S/. 203.23 S/. 174.87 S/. 378.10
S/. 3,982.50 S/. - S/. - S/. 3,982.50 S/. 3,982.50
S/. 2,597.18 S/. - S/. - S/. 2,597.18 S/. 2,597.18
S/. 411.50 S/. - S/. - S/. 411.50 S/. 411.50
S/. 4,291.77 S/. - S/. - S/. 4,291.77 S/. 4,291.77
S/. 7,446.78 S/. - S/. - S/. 7,446.78 S/. 7,446.78

S/. 22,376.79 S/. 22,376.79 S/. - S/. - S/. 22,376.79


S/. 169,784.88 S/. - S/. 26,528.89 S/. 143,255.99 S/. 169,784.88

S/. 3,094.95 S/. 3,094.95 S/. - S/. - S/. 3,094.95


S/. 1,764.08 S/. - S/. - S/. 1,764.08 S/. 1,764.08

S/. 5,385.79 S/. 5,284.81 S/. 100.98 S/. - S/. 5,385.79


LIDAD DISTRITAL DE NUEVO CHIMBOTE
AS SEMI-URBANA PRIMERA Y SEGUNDA ETAPA Y SEMI-RUSTICA PRIMERA Y SEGUNDA ETAPA DEL "
ES-DISTRITO DE NUEVO CHIMBOTE-PROVINCIA DE SANTA-REGION ANCASH". I ETAPA-CODIGO UNIFICADO N°
2398393
-----------------------------------------------------------------------------------------------------------------
A VALORIZADO DE AVANCE DE OBRA
FECHA: JULIO 2018

-URBANA PRIMERA Y SEGUNDA ETAPA Y SEMI-RUSTICA PRIMERA Y SEGUNDA ETAPA DEL NUCLEO
EVO CHIMBOTE-PROVINCIA DE SANTA-REGION ANCASH". I ETAPA-CODIGO UNIFICADO N° 2398393

PRESUPUESTO 90 dias calendarios

MES 1 MES 2 MES 3 Total (S/.)


Parcial (S/.)
Parcial (S/.) Parcial (S/.) Parcial (S/.)

S/. 19,234.85 S/. 19,234.85 S/. - S/. - S/. 19,234.85


S/. 1,737.35 S/. 1,737.35 S/. - S/. - S/. 1,737.35

S/. 19,506.97 S/. 11,074.27 S/. 8,432.70 S/. - S/. 19,506.97


S/. 9,138.46 S/. 4,426.44 S/. 4,712.02 S/. - S/. 9,138.46
S/. 35,476.69 S/. 35,476.69 S/. - S/. - S/. 35,476.69
S/. 16,106.91 S/. 4,170.54 S/. 11,936.37 S/. - S/. 16,106.91

S/. 134,540.38 S/. 79,042.47 S/. 55,497.91 S/. - S/. 134,540.38


S/. 24,814.01 S/. 17,886.77 S/. 6,927.24 S/. - S/. 24,814.01

S/. 1,961.01 S/. - S/. 1,961.01 S/. - S/. 1,961.01

S/. 178.80 S/. - S/. 178.80 S/. - S/. 178.80


S/. 227.56 S/. - S/. 227.56 S/. - S/. 227.56
S/. 1,858.56 S/. - S/. 1,858.56 S/. - S/. 1,858.56

S/. 6,411.31 S/. - S/. 5,400.00 S/. 1,011.31 S/. 6,411.31


S/. 988.20 S/. 844.09 S/. 144.11 S/. - S/. 988.20
LIDAD DISTRITAL DE NUEVO CHIMBOTE
AS SEMI-URBANA PRIMERA Y SEGUNDA ETAPA Y SEMI-RUSTICA PRIMERA Y SEGUNDA ETAPA DEL "
ES-DISTRITO DE NUEVO CHIMBOTE-PROVINCIA DE SANTA-REGION ANCASH". I ETAPA-CODIGO UNIFICADO N°
2398393
-----------------------------------------------------------------------------------------------------------------
A VALORIZADO DE AVANCE DE OBRA
FECHA: JULIO 2018

-URBANA PRIMERA Y SEGUNDA ETAPA Y SEMI-RUSTICA PRIMERA Y SEGUNDA ETAPA DEL NUCLEO
EVO CHIMBOTE-PROVINCIA DE SANTA-REGION ANCASH". I ETAPA-CODIGO UNIFICADO N° 2398393

PRESUPUESTO 90 dias calendarios

MES 1 MES 2 MES 3 Total (S/.)


Parcial (S/.)
Parcial (S/.) Parcial (S/.) Parcial (S/.)

S/. 1,143.14 S/. 976.43 S/. 166.71 S/. - S/. 1,143.14

S/. 5,963.78 S/. - S/. 1,466.10 S/. 4,497.68 S/. 5,963.78

S/. 441.83 S/. - S/. 441.83 S/. - S/. 441.83


S/. 142.53 S/. - S/. 142.53 S/. - S/. 142.53
S/. 4,648.08 S/. - S/. 4,648.08 S/. - S/. 4,648.08

S/. 4,263.83 S/. - S/. 4,263.83 S/. - S/. 4,263.83


S/. 3,929.98 S/. - S/. 3,929.98 S/. - S/. 3,929.98

S/. 40,540.95 S/. - S/. 40,540.95 S/. - S/. 40,540.95


S/. 57,740.99 S/. - S/. 57,740.99 S/. - S/. 57,740.99
S/. 16,040.73 S/. - S/. 16,040.73 S/. - S/. 16,040.73

S/. 219.30 S/. - S/. 219.30 S/. - S/. 219.30


LIDAD DISTRITAL DE NUEVO CHIMBOTE
AS SEMI-URBANA PRIMERA Y SEGUNDA ETAPA Y SEMI-RUSTICA PRIMERA Y SEGUNDA ETAPA DEL "
ES-DISTRITO DE NUEVO CHIMBOTE-PROVINCIA DE SANTA-REGION ANCASH". I ETAPA-CODIGO UNIFICADO N°
2398393
-----------------------------------------------------------------------------------------------------------------
A VALORIZADO DE AVANCE DE OBRA
FECHA: JULIO 2018

-URBANA PRIMERA Y SEGUNDA ETAPA Y SEMI-RUSTICA PRIMERA Y SEGUNDA ETAPA DEL NUCLEO
EVO CHIMBOTE-PROVINCIA DE SANTA-REGION ANCASH". I ETAPA-CODIGO UNIFICADO N° 2398393

PRESUPUESTO 90 dias calendarios

MES 1 MES 2 MES 3 Total (S/.)


Parcial (S/.)
Parcial (S/.) Parcial (S/.) Parcial (S/.)

S/. 3,696.55 S/. - S/. 3,696.55 S/. - S/. 3,696.55

S/. 94.38 S/. - S/. 94.38 S/. - S/. 94.38


S/. 30.45 S/. - S/. 30.45 S/. - S/. 30.45

S/. 1,410.05 S/. - S/. 1,410.05 S/. - S/. 1,410.05


S/. 726.01 S/. - S/. 726.01 S/. - S/. 726.01

S/. 13,104.64 S/. - S/. - S/. 13,104.64 S/. 13,104.64


S/. 21,538.68 S/. - S/. 5,192.36 S/. 16,346.32 S/. 21,538.68
S/. 3,920.82 S/. - S/. 3,920.82 S/. - S/. 3,920.82

S/. 1,754.71 S/. - S/. - S/. 1,754.71 S/. 1,754.71

S/. 207.76 S/. - S/. - S/. 207.76 S/. 207.76


S/. 32.38 S/. - S/. - S/. 32.38 S/. 32.38
S/. 15.36 S/. - S/. - S/. 15.36 S/. 15.36
LIDAD DISTRITAL DE NUEVO CHIMBOTE
AS SEMI-URBANA PRIMERA Y SEGUNDA ETAPA Y SEMI-RUSTICA PRIMERA Y SEGUNDA ETAPA DEL "
ES-DISTRITO DE NUEVO CHIMBOTE-PROVINCIA DE SANTA-REGION ANCASH". I ETAPA-CODIGO UNIFICADO N°
2398393
-----------------------------------------------------------------------------------------------------------------
A VALORIZADO DE AVANCE DE OBRA
FECHA: JULIO 2018

-URBANA PRIMERA Y SEGUNDA ETAPA Y SEMI-RUSTICA PRIMERA Y SEGUNDA ETAPA DEL NUCLEO
EVO CHIMBOTE-PROVINCIA DE SANTA-REGION ANCASH". I ETAPA-CODIGO UNIFICADO N° 2398393

PRESUPUESTO 90 dias calendarios

MES 1 MES 2 MES 3 Total (S/.)


Parcial (S/.)
Parcial (S/.) Parcial (S/.) Parcial (S/.)

S/. 652.64 S/. - S/. - S/. 652.64 S/. 652.64

### S/. 453,452.75 ### ### ###


S/. 117,508.49 S/. 45,345.28 S/. 51,723.52 S/. 20,439.69 S/. 117,508.49
S/. 117,508.49 S/. 45,345.28 S/. 51,723.52 S/. 20,439.69 S/. 117,508.49
### S/. 544,143.31 ### ### ###
S/. 253,818.35 S/. 97,945.80 ### S/. 44,149.75 S/. 253,818.35
### S/. 642,089.11 ### ### ###
38.59% 44.02% 17.39% 100.00%
38.59% 82.61% 100.00% 100.00%
S10

Presupuesto
Presupuesto 0306047
"CREACIÓN DE LOS SERVICIOS DE TRANSITABILIDAD EN EL A.H. VILLA MAGISTERIAL I ETAPA, DISTRITO DE NUEVO CHIMBOTE - SANTA - ANCASH
Cliente MUNICIPALIDAD DISTRITAL DE NUEVO CHIMBOTE
Lugar ANCASH - SANTA - NVO. CHIMBOTE

Item Descripción Und.

01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA (GIGANTOGRAFIA 7.20X4.80) und
01.02 OFICINA, ALMACEN Y CASETA DE GUARDIANIA mes
02 TRABAJOS PRELIMINARES
02.01 MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL GLB

02.02 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS, MAQUINARIAS Y HERRAMIENTAS GLB

02.03 LIMPIEZA DE TERRENO MANUAL m2

02.04 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2

02.05 RETIRO DE CARPETA ASFALTICA EXISTENTE DETERIORADO E=2" m2


03 MOVIMIENTO DE TIERRAS
03.01 CORTE EN TERRENO NORMAL HASTA NIVEL DE SUBRASANTE m3
03.02 CONFORMACIÓN DE SUBRASANTE m2
03.03 ELIMINACIÓN DE MATERIAL EXCEDENTE CON MAQUINARIA m3
04 PAVIMENTO FLEXIBLE
04.01 SUB BASE AFIRMADO E=0.20M m2

04.02 BASE AFIRMADO E=0.15M m2

04.03 IMPRIMACIÓN ASFALTICA CON MC-30 m2

04.04 CARPETA ASFALTICA EN CALIENTE DE 2" m2

04.05 REDUCTORES DE VELOCIDAD


04.05.01 IMPRIMACIÓN ASFALTICA CON MC-30 m2

04.05.02 REDUCTORES DE VELOCIDAD DE ASFALTO EN CALIENTE und


04.06 SEÑALIZACIÓN DE TRANSITO
04.06.01 TRAZO DE LINEAS (CONTINUAS Y DISCONTINUAS) m
04.06.02 TRAZO DE SIMBOLOS (PEATONALES Y DIRECCIONALES) m2
04.06.03 PINTADO DE PAVIMENTO (LINEA CONTINUA Y DESCONTINUA) m
04.06.04 PINTADO DE PAVIMENTOS (PEATONALES Y DIRECCIONALES) m2
04.06.05 PINTADO DE PAVIMENTOS (REDUCTORES DE VELOCIDAD) m2
04.06.06 SUMINISTRO E INSTALACION DE TACHAS REFLECTIVAS 10cmx10cmx16.7mm und
04.06.07 SUMINISTRO E INSTALACION DE TACHONES REFLECTIVOS COLOR AMARILLO DE 20x10x5cm und
05 PAVIMENTO RIGIDO
05.01 BASE DE AFIRMADO E=0.15 M. m2
05.02 ADOQUINES DE CONCRETO COLOR ROJO E=8CM TIPO II (20x10x8cm) m2
05.03 VARIOS
05.03.01 PICADO Y/O ENCIMADO DE CUERPO DE BUZONES EXISTENTES und
05.03.02 MURETE DE CONCRETO ARMADO F´C=175 kg/cm2 REVESTIDO DE GRANITO CON PLACA RECOR und
06.01 VEREDAS
06 TRABAJOS PRELIMINARES
06.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2
06.01.02 DEMOLICION DE VEREDAS EXISTENTES C/MAQUINARIA m2
06.01.03 LIMPIEZA DE TERRENO MANUAL m2

06.02 MOVIMIENTO DE TIERRAS


06.02.01 CORTE SUPERFICIAL MANUAL HASTA NIVEL DE SUBRASANTE m3
06.02.02 NIVELACION Y COMPACTACION DE SUBRASANTE m2

06.02.03 AFIRMADO DE 4" PARA VEREDAS m2

06.02.04 ELIMINACIÓN DE MATERIAL EXCEDENTE CON MAQUINARIA m3


06.03 CONCRETO SIMPLE
06.03.01 CONCRETO EN VEREDAS Y RAMPAS F'C=175 KG/CM2, E=4" INCL. ACABADO PULIDO m2
06.03.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2
06.04 JUNTAS DE DILATACION
06.04.01 JUNTA DE DILATACIÓN ASFALTICA E=1" PARA VEREDAS m

06.05 RAMPAS EN MARTILLOS


06.05.01 ENCOFRADO Y DESENCOFRADO EN RAMPAS m2
06.05.02 CONCRETO EN RAMPAS (UÑAS), F´C=175 kg/cm2 m3

06.05.03 CONCRETO EN RAMPAS FC=175 kg/cm2, E=10cm, INCL. ACABADO PULIDO Y BRUÑADO m2

06.06 OTROS
06.06.01 CURADO DE VEREDAS (INC. ARROCERAS) m2
06.06.02 NIVELACIÓN DE CAJAS DE AGUA und
06.06.03 NIVELACIÓN DE CAJAS DE DESAGUE und
06.07 PINTURA
06.07.01 PINTURA DE TRAFICO EN BORDE DE VEREDAS m2

01 SARDINELES
01.01 SARDINELES SUMERGIDOS
01.01.01 TRABAJOS PRELIMINARES
01.01.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2
01.01.01.02 LIMPIEZA DE TERRENO MANUAL m2
01.01.01.03 DEMOLICION DE SARDINELES PERALTADOS EXISTENTES m3
01.01.02 MOVIMIENTO DE TIERRAS
01.01.02.01 EXCAVACION MANUAL DE ZANJA PARA SARDINELES m3

01.01.02.02 ELIMINACIÓN DE MATERIAL EXCEDENTE CON MAQUINARIA m3


01.01.03 CONCRETO ARMADO
01.01.03.01 CONCRETO EN SARDINEL SUMERGIDO F'C=175 KG/CM2 m3
01.01.03.02 ENCOFRADO Y DESENCOFRADO EN SARDINEL SUMERGIDO EN PISTA m2
01.01.03.03 ACERO DE REFUERZO FY=4200 KG/CM2 PARA SARDINELES SUMERGIDOS kg
01.01.04 JUNTAS DE DILATACION
01.01.04.01 JUNTA DE DILATACIÓN E=1" PARA SARDINELES m2
01.01.05 PINTURA
01.01.05.01 PINTURA DE TRAFICO EN BORDE DE SARDINEL SUMERGIDO m2
02 JARDINERA PERALTADA DE CONCRETO F´c=175kg/cm2, H= 15CM
02.01 TRABAJOS PRELIMINARES
02.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2
02.01.02 LIMPIEZA DE TERRENO MANUAL m2
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL DE ZANJA PARA JARDINERAS m3
02.02.02 ELIMINACIÓN DE MATERIAL EXCEDENTE CON MAQUINARIA m3
02.03 CONCRETO ARMADO
02.03.01 CONCRETO F'C=175 KG/CM2 PARA SARDINELES PERALTADO EN JARDINERAS.(INCL.ADITIVO IMP m3
02.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN SARDINELES PERALTADOS DE JARDINERAS m2
02.03.03 ACERO DE REFUERZO FY=4200 KG/CM2 EN SARDINEL DE JARDINERA kg
02.03.04 PINTURA
02.03.04.01 PINTURA DE TRAFICO EN BORDE DE SARDINEL DE JARDINERA, H= 15CM m2
03 AREAS VERDES
03.01 MOVIMIENTO DE TIERRAS
03.01.01 REUBICACION DE ARBOLES EXISTENTES und
03.01.02 MEJORAMIENTO DE TERRENO CON MATERIAL ORGANICO m2
03.01.03 PREPARACIÓN DE TERRENO PARA SEMBRADO m2
03.01.04 CONSERVACIÓN Y RIEGO DE JARDINES HASTA ENTREGA DE OBRA GLB
DE NUEVO CHIMBOTE - SANTA - ANCASH."

Metrado Precio S/. Parcial S/.

2 1634.24 3268.48
3.00 700.00 2,100.00

1.00 3,903.40 3,903.40


1.00 1,595.00 1,595.00

6,800.20 0.50 3,400.10

6,800.20 1.55 10,540.31

6295.48 2.56 16,116.43

2,606.00 5.78 15,062.68


6,800.20 2.38 16,184.48
3504.93 14.81 51,908.01

6,800.20 10.09 68,614.02

6,800.20 8.47 57,597.69

6,800.20 4.01 27,268.80

6,800.20 31.68 215,430.34

47.52 4.01 190.56

5 752.73 3,763.65

2,164.40 1.01 2,186.04


165.11 2.29 378.10
2,164.40 1.84 3,982.50
165.11 15.73 2,597.18
26.16 15.73 411.50
321.00 13.37 4,291.77
198.00 37.61 7,446.78

2629.47 8.51 22,376.79


2,629.47 64.57 169,784.88

15.00 206.33 3,094.95


1.00 1,764.08 1,764.08

3474.7 1.55 5,385.79


2,113.72 9.10 19,234.85
3,474.70 0.50 1,737.35

694.94 28.07 19,506.97


3,474.70 2.63 9,138.46
3,474.70 10.21 35,476.69

1087.57 14.81 16,106.91


3474.7 38.72 134,540.38
685.47 36.2 24,814.01

1,043.09 1.88 1,961.01

8 22.35 178.80
0.64 355.56 227.56

48.00 38.72 1,858.56

3,522.70 1.82 6,411.31


61.00 16.20 988.20
61.00 18.74 1,143.14
5,963.78
573.44 10.40

131,664.77

285.05 1.55 441.83


285.05 0.50 142.53
69.24 67.13 4,648.08

151.90 28.07 4,263.83

265.36 14.81 3,929.98

114.02 355.56 40,540.95


1,519.10 38.01 57,740.99
3,588.53 4.47 16,040.73

25.74 8.52 219.30

257.42 14.36 3,696.55

60.89 1.55 94.38


60.89 0.50 30.45

44.65 31.58 1,410.05


53.58 13.55 726.01

33.49 391.30 13,104.64


446.49 48.24 21,538.68
877.14 4.47 3,920.82

121.77 14.41 1,754.71

8.00 25.97 207.76


6.40 5.06 32.38
6.40 2.40 15.36
1.00 652.64 652.64