Está en la página 1de 72

PROMEDIO MOVIL SIMPLE

EJERCICIO 1

DESARROLLAR UN PRONOSTICO DE PROMEDIO MOVIL DE 3 SEMANAS Y 6 SEMANAS

Pronostico 1000
Semana # Unidades 3 semanas 6 semanas 900
1 650
800
2 678
3 720 700
4 785 682.67 600
5 859 727.67 500
6 920 788.00
400
7 850 854.67 768.67
8 758 876.33 802.00 300
9 892 842.67 815.33 200
10 920 833.33 844.00 100
11 789 856.67 866.50
0
12 844 867.00 854.83 1 2 3

DEMAND

EJERCICIO 2

HALLAR EL PRONOSTICO DE VENTAS UTILIZANDO EL METODO DE PROMEDIO MOVIL SIMPLE CON 2 SEMANAS Y 4 SEMANAS

Pronostico 200
Ventas
Semana (Unid) 2 semanas 4 semanas 180

1 137 160
2 156 140
3 136 146.50
120
4 110 146.00
5 168 123.00 134.75 100
6 160 139.00 142.50 80
7 102 164.00 143.50
60
8 160 131.00 135.00
9 178 131.00 147.50 40
10 127 169.00 150.00 20
11 146 152.50 141.75
-
12 100 136.50 152.75 1 2 3

EJERCICIO 3

HALLAR EL PRONOSTICO DE VENTAS UTILIZANDO EL METODO DE PROMEDIO MOVIL SIMPLE CON 3 y 5 SEMANAS

Pronostico
Compras
Semana (Unids) 3 semanas 4 semanas 5 semanas
1,600
1 1,063
2 1,467
1,400

1,200
1,600

3 1,441 1,400
4 1,205 1,323.67
5 1,285 1,371.00 1,294.00
6 1,248 1,310.33 1,349.50 1,292.20 1,200
7 1,329 1,246.00 1,294.75 1,329.20
8 1,387 1,287.33 1,266.75 1,301.60
9 1,021 1,321.33 1,312.25 1,290.80 1,000
10 1,122 1,245.67 1,246.25 1,254.00
11 1,083 1,176.67 1,214.75 1,221.40
12 1,303 1,075.33 1,153.25 1,188.40
800
13 1,237 1,169.33 1,132.25 1,183.20
14 1,421 1,207.67 1,186.25 1,153.20
15 1,361 1,320.33 1,261.00 1,233.20
600
16 1,242 1,339.67 1,330.50 1,281.00
17 1,187 1,341.33 1,315.25 1,312.80
18 1,479 1,263.33 1,302.75 1,289.60
19 1,061 1,302.67 1,317.25 1,338.00 400
20 1,128 1,242.33 1,242.25 1,266.00
21 1,298 1,222.67 1,213.75 1,219.40
22 1,197 1,162.33 1,241.50 1,230.60 200
23 1,035 1,207.67 1,171.00 1,232.60
24 1,142 1,176.67 1,164.50 1,143.80
25 1,245 1,124.67 1,168.00 1,160.00 -
26 1,009 1,140.67 1,154.75 1,183.40 1 2 3 4 5 6 7 8
27 1,388 1,132.00 1,107.75 1,125.60
Com
28 1,384 1,214.00 1,196.00 1,163.80
29 1,044 1,260.33 1,256.50 1,233.60
30 1,210 1,272.00 1,206.25 1,214.00

EJERCICIO 4

HALLAR EL PRONOSTICO DE VENTAS UTILIZANDO EL METODO DE PROMEDIO MOVIL SIMPLE CON 3 y 5 SEMANAS

Pronostico
Compras 140
Semana (Unids) 3 semanas 5 semanas
1 100 120
2 125
3 90
100
4 110 105.00
5 105 108.33
6 130 101.67 106.00 80
7 85 115.00 112.00
8 102 106.67 104.00 60
9 110 105.67 106.40
10 90 99.00 106.40 40
11 105 100.67 103.40
12 95 101.67 98.40
20
13 115 96.67 100.40
14 120 105.00 103.00
15 80 110.00 105.00 0
1 2 3 4 5 6
16 95 105.00 103.00
17 100 98.33 101.00 Com
EJERCICIO 5

OBJETIVO INCIAL: DECIRLE CUÁNTOS VEHICULOS POR DÍA ESPERAMOS QUE DEBA ATENDER LA SEMANA PRÓXIMA (SEMANA N
LO PRIMERO QUE HACEMOS, ES ORDENAR EN UNA TABLA LA CANTIDAD DE VEHICULOS ATENDIDOS POR DÍA, DE LAS ÚLTIMAS
ASÍ PODEMOS VER UN PROMEDIO SEMANAL Y TOTAL:

SEMANA 1 2 3 4 5
Lunes 10 12 11 14 13
Martes 20 23 25 29 26
Miércoles 15 19 19 21 20
Jueves 20 25 25 27 27
Viernes 30 36 37 41 38
Sábado 50 60 62 68 66
Demanda por día 145.0 175.0 179.0 200.0 190.0

Demanda semanal 889.0

UTILIZANDO UN PROMEDIO MOVIL SIMPLE DE 3 PERÍODOS DETERMINAR EL PRONOSTICO PARA LA SEMANA 6

EJERCICIO 6

HALLAR EL PRONOSTICO UTILIZANDO EL METODO DE PROMEDIO MOVIL SIMPLE CON 3 y 5 SEMANAS

Pronostico 25
Ventas de
Mes, del año Chocolate en
2011 miles de 3 semanas 5 semanas
20
unidades
Enero 20
Febrero 21 15
Marzo 15
Abril 14 18.67
Mayo 13 16.67 10
Junio 16 14.00 16.60
Julio 17 14.33 15.80
Agosto 18 15.33 15.00 5
Septiembre 20 17.00 15.60
Octubre 20 18.33 16.80
Noviembre 21 19.33 18.20
0
Diciembre 23 20.33 19.20 Enero Febrero Marzo Abril Ma

Ventas de Chocolate
EJERCICIO 7

HALLAR EL PRONOSTICO UTILIZANDO EL METODO DE PROMEDIO MOVIL SIMPLE CON 2 y 4 PERÍODOS

Pronostico
AÑO TRIM t Visitas 2 semanas 4 semanas
2003 trim-1 1 500
trim-2 2 350 800
trim-3 3 250 425.00
trim-4 4 400 300.00
700
2004 trim-1 5 450 325.00 375.00
trim-2 6 350 425.00 362.50
trim-3 7 200 400.00 362.50 600
trim-4 8 300 275.00 350.00
500

400
700

600

2005 trim-1 9 350 250.00 325.00 500


trim-2 10 200 325.00 300.00
trim-3 11 150 275.00 262.50
400
trim-4 12 400 175.00 250.00
2007 trim-1 13 550 275.00 275.00
trim-2 14 350 475.00 325.00 300
trim-3 15 250 450.00 362.50
trim-4 16 550 300.00 387.50
200
2008 trim-1 17 550 400.00 425.00
trim-2 18 400 550.00 425.00
trim-3 19 350 475.00 437.50 100
trim-4 20 600 375.00 462.50
2009 trim-1 21 750 475.00 475.00
0
trim-2 22 500 675.00 525.00 1 2 3 4 5 6
trim-3 23 400 625.00 550.00
trim-4 24 650 450.00 562.50
2010 trim-1 25 500 525.00 575.00
trim-2 26 610 575.00 512.50
trim-3 27 580 555.00 540.00
GRÁFICO

1 2 3 4 5 6 7 8 9 10 11 12

DEMANDA PRONOSTICO 3 SEMANAS PRONOSTICO 6 SEMANAS

SEMANAS Y 4 SEMANAS GRÁFICO

0
0
0
0
0
0
0
0
0
0

1 2 3 4 5 6 7 8 9 10 11 12

DEMANDA PRONOSTICO 2 SEMANAS PRONOSTICO

y 5 SEMANAS GRÁFICO
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Compras (Unids) 3 semanas 4 semanas 5 semanas

GRÁFICO

y 5 SEMANAS

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Compras (Unids) 3 semanas 5 semanas


ANA PRÓXIMA (SEMANA NRO 6)
POR DÍA, DE LAS ÚLTIMAS 5 SEMANAS, Y

PRONOSTICO DEMANDA SEMANA 6


189.7

GRÁFICO

Marzo Abril Mayo Junio Julio Agosto Septiembre Octubre Noviembre Diciembre

Ventas de Chocolate en miles de unidades 3 semanas 5 semanas


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

Visitas 2 semanas 4 semanas


28 29 30
25 26 27
EJEMPLO: PROMEDIO MOVIL SIMPLE

3 semanas 4 semanas
Semana # Unidades Pronostico Error Error2 |Error| Pronostico Error Error2
1 650
2 678
3 720
4 785
5 859 727.67 131.33 17,248.44 131.33 708.25 150.75 22,725.56
6 920 788.00 132.00 17,424.00 132.00 760.50 159.50 25,440.25
7 850 854.67 -4.67 21.78 4.67 821.00 29.00 841.00
8 758 876.33 -118.33 14,002.78 118.33 853.50 -95.50 9,120.25
9 892 842.67 49.33 2,433.78 49.33 846.75 45.25 2,047.56
10 920 833.33 86.67 7,511.11 86.67 855.00 65.00 4,225.00
11 789 856.67 -67.67 4,578.78 67.67 855.00 -66.00 4,356.00
12 844 867.00 -23.00 529.00 23.00 839.75 4.25 18.06

TOTAL

ERROR CUADRATICO MEDIO (ECM) = 7,968.71 8,596.71

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 76.63 76.91


manas
|Error|

150.75
159.50
29.00
95.50
45.25
65.00
66.00
4.25
PROMEDIO MOVIL PONDERADO
EJERCICIO 1

DESARROLLAR UN PRONOSTICO DE PROMEDIO MOVIL PONDERADO DE 3 SEMANAS


CONSIDERANDO LOS SIGUIENTES PESOS PONDERADOS:
1000
T-3 30% Periodo actual - 3 900
T-2 0% Periodo actual - 2
T-1 70% Periodo actual - 1 800
Total 100%
700

Pronostico 600
Semana # Unidades 3 semanas Error Error2 |Error|
500
1 650
2 678 400
3 720
300
4 785 699.33 85.67 7,339.66 85.67
5 859 753.40 105.60 11,151.02 105.60 200
6 920 817.95 102.05 10,413.87 102.05
7 850 880.13 -30.13 907.99 30.13 100
8 758 852.66 -94.66 8,960.10 94.66 0
9 892 805.84 86.16 7,423.45 86.16 1 2
10 920 879.60 40.40 1,632.41 40.40
11 789 872.16 -83.16 6,915.49 83.16
12 844 819.42 24.58 604.32 24.58

ERROR CUADRATICO MEDIO (ECM) = 6,149.81

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 72.49

EJERCICIO 2

HALLAR EL PRONOSTICO DE VENTAS UTILIZANDO EL METODO DE PROMEDIO MOVIL PONDERADO CON 4 SEMANAS
CONSIDERANDO LOS SIGUIENTES PESOS PONDERADOS:

T-4 24% Periodo actual - 4


T-3 76% Periodo actual - 3
T-2 0% Periodo actual - 2
T-1 0% Periodo actual - 1
Total 100%

Pronostico
Ventas
Semana (Unid) 4 semanas Error Error2 |Error|

1 137
2 156
3 136
4 110
5 168 151.41 16.59 275.10 16.59
6 160 140.83 19.17 367.58 19.17
7 102 116.28 -14.28 203.80 14.28
8 160 154.00 6.00 36.00 6.00
9 178 161.93 16.07 258.21 16.07
10 127 116.00 11.00 121.00 11.00
11 146 146.00 0.00 0.00 0.00
12 100 173.66 -73.66 5,425.08 73.66

ERROR CUADRATICO MEDIO (ECM) = 835.85

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 19.59

EJERCICIO 3

HALLAR EL PRONOSTICO DE VENTAS UTILIZANDO EL METODO DE PROMEDIO MOVIL PONDERADO CON 3 y 4 SEMANAS
CONSIDERANDO LOS SIGUIENTES PESOS PONDERADOS:

T-4 0.18 Periodo actual - 4


T-3 0.50 T-3 0.44 Periodo actual - 3
T-2 0.15 T-2 0.12 Periodo actual - 2
T-1 0.35 T-1 0.25 Periodo actual - 1
Total 0.99 Total 0.99

3 semanas 4 semanas
Compras
Semana (Unids) Pronostico Error Error2 |Error| Pronostico Error

1 1,063
2 1,467
3 1,441
4 1,205
5 1,285 1,353.92 -68.92 4,750.59 68.92 1,309.99 -24.99
6 1,248 1,334.14 -86.14 7,420.38 86.14 1,360.86 -112.86
7 1,329 1,216.10 112.90 12,747.47 112.90 1,252.60 76.40
8 1,387 1,278.30 108.70 11,815.23 108.70 1,262.02 124.98
9 1,021 1,291.84 -270.84 73,352.19 270.84 1,284.06 -263.06
10 1,122 1,214.10 -92.10 8,481.98 92.10 1,229.27 -107.27
11 1,083 1,224.19 -141.19 19,933.40 141.19 1,249.78 -166.78
12 1,303 1,044.09 258.91 67,036.23 258.91 1,100.96 202.04
13 1,237 1,164.40 72.60 5,270.50 72.60 1,131.13 105.87
14 1,421 1,154.46 266.54 71,042.86 266.54 1,142.01 278.99
15 1,361 1,317.38 43.62 1,902.73 43.62 1,270.05 90.95
16 1,242 1,290.86 -48.86 2,387.59 48.86 1,287.08 -45.08
17 1,187 1,332.20 -145.20 21,082.72 145.20 1,319.79 -132.79
18 1,479 1,266.07 212.93 45,341.21 212.93 1,297.55 181.45
19 1,061 1,299.86 -238.86 57,053.12 238.86 1,300.42 -239.42
20 1,128 1,170.98 -42.98 1,847.53 42.98 1,186.65 -58.65
21 1,298 1,277.71 20.29 411.80 20.29 1,271.76 26.24
22 1,197 1,139.02 57.98 3,361.35 57.98 1,189.06 7.94
23 1,035 1,162.22 -127.22 16,185.76 127.22 1,140.58 -105.58
24 1,142 1,175.78 -33.78 1,140.87 33.78 1,174.84 -32.84
25 1,245 1,138.97 106.03 11,243.17 106.03 1,167.11 77.89
26 1,009 1,109.88 -100.88 10,177.67 100.88 1,116.44 -107.44
27 1,388 1,096.50 291.50 84,972.45 291.50 1,088.95 299.05
28 1,384 1,243.89 140.11 19,630.59 140.11 1,218.90 165.10
29 1,044 1,180.97 -136.97 18,760.92 136.97 1,177.91 -133.91
30 1,210 1,250.84 -40.84 1,668.16 40.84 1,218.60 -8.60

ERROR CUADRATICO MEDIO (ECM) = 22,269.94

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 125.65

EJERCICIO 4

HALLAR EL PRONOSTICO DE VENTAS UTILIZANDO EL METODO DE PROMEDIO MOVIL PONDERADO CON 3 y 5 SEMANAS
CONSIDERANDO LOS SIGUIENTES PESOS PONDERADOS:

T-5 0.38 Periodo actual - 5


T-4 0.46 Periodo actual - 4
T-3 0.44 T-3 0.14 Periodo actual - 3
T-2 0.36 T-2 0.00 Periodo actual - 2
T-1 0.17 T-1 - Periodo actual - 1
Total 0.98 Total 0.98

3 semanas 5 semanas
Compras
Semana (Unids) Pronostico Error Error2 |Error| Pronostico Error

1 100
2 125
3 90
4 110
5 105
6 130 97.80 32.20 1,036.95 32.20 107.75 22.25
7 85 109.19 -24.19 585.32 24.19 103.96 -18.96
8 102 108.20 -6.20 38.46 6.20 99.24 2.76
9 110 105.99 4.01 16.07 4.01 107.72 2.28
10 90 93.56 -3.56 12.68 3.56 111.21 -21.21
11 105 100.52 4.48 20.07 4.48 102.52 2.48
12 95 99.45 -4.45 19.78 4.45 94.17 0.83
13 115 94.26 20.74 430.11 20.74 101.64 13.36
14 120 100.77 19.23 369.86 19.23 97.54 22.46
15 80 104.42 -24.42 596.28 24.42 95.53 -15.53
16 95 108.16 -13.16 173.18 13.16 99.40 -4.40
17 100 98.54 1.46 2.13 1.46 105.20 -5.20

ERROR CUADRATICO MEDIO (ECM) = 275.08

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 13.18

EJERCICIO 5

HALLAR EL PRONOSTICO UTILIZANDO EL METODO DE PROMEDIO MOVIL PONDERADO CON 3 y 5 SEMANAS


CONSIDERANDO LOS SIGUIENTES PESOS PONDERADOS:

T-5 0.02 Periodo actual - 5


T-4 - Periodo actual - 4
T-3 - T-3 - Periodo actual - 3
T-2 - T-2 - Periodo actual - 2
T-1 1.00 T-1 0.98 Periodo actual - 1
Total 1.00 Total 1.00

3 semanas 5 semanas
Ventas de
Mes, del año Chocolate en
2011 miles de Pronostico Error Error2 |Error| Pronostico Error
unidades
Enero 20
Febrero 21
Marzo 15
Abril 14
Mayo 13
Junio 16 13.00 3.00 9.00 3.00 13.16 2.84
Julio 17 16.00 1.00 1.00 1.00 16.11 0.89
Agosto 18 17.00 1.00 1.00 1.00 16.95 1.05
Septiembre 20 18.00 2.00 4.00 2.00 17.91 2.09
Octubre 20 20.00 -0.00 0.00 0.00 19.84 0.16
Noviembre 21 20.00 1.00 1.00 1.00 19.91 1.09
Diciembre 23 21.00 2.00 4.00 2.00 20.91 2.09

ERROR CUADRATICO MEDIO (ECM) = 2.86

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 1.43

EJERCICIO 6

HALLAR EL PRONOSTICO UTILIZANDO EL METODO DE PROMEDIO MOVIL PONDERADO CON 4 PERÍODOS


CONSIDERANDO LOS SIGUIENTES PESOS PONDERADOS:

T-4 0.53 Periodo actual - 4


T-3 0.19 Periodo actual - 3
T-2 - Periodo actual - 2
T-1 0.28 Periodo actual - 1
Total 1.00

Pronostico
AÑO TRIM t Visitas 4 semanas Error Error2 |Error|
2003 trim-1 1 500
trim-2 2 350
trim-3 3 250
trim-4 4 400
2004 trim-1 5 450 443.33 6.67 44.43 6.67
trim-2 6 350 358.65 -8.65 74.89 8.65
trim-3 7 200 306.67 -106.67 11,377.63 106.67
trim-4 8 300 353.88 -53.88 2,903.56 53.88
2005 trim-1 9 350 389.01 -39.01 1,521.55 39.01
trim-2 10 200 321.19 -121.19 14,687.71 121.19
trim-3 11 150 219.20 -69.20 4,789.30 69.20
trim-4 12 400 267.81 132.19 17,473.10 132.19
2007 trim-1 13 550 335.12 214.88 46,172.44 214.88
trim-2 14 350 287.90 62.10 3,855.98 62.10
trim-3 15 250 253.73 -3.73 13.91 3.73
trim-4 16 550 387.02 162.98 26,562.84 162.98
2008 trim-1 17 550 511.59 38.41 1,475.29 38.41
trim-2 18 400 386.51 13.49 181.90 13.49
trim-3 19 350 349.40 0.60 0.36 0.60
trim-4 20 600 494.28 105.72 11,176.22 105.72
2009 trim-1 21 750 535.12 214.88 46,172.44 214.88
trim-2 22 500 487.90 12.10 146.33 12.10
trim-3 23 400 439.80 -39.80 1,584.05 39.80
trim-4 24 650 573.09 76.91 5,915.23 76.91
2010 trim-1 25 500 674.13 -174.13 30,321.01 174.13
trim-2 26 610 480.80 129.20 16,693.87 129.20
trim-3 27 580 506.52 73.48 5,399.98 73.48

ERROR CUADRATICO MEDIO (ECM) = 10,806.26

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 80.86

EJERCICIO 7

HALLAR EL PRONOSTICO UTILIZANDO EL METODO DE PROMEDIO MOVIL PONDERADO CON 3 PERÍODOS


CONSIDERANDO LOS SIGUIENTES PESOS PONDERADOS:

T-3 0.11 Periodo actual - 3


T-2 0.40 Periodo actual - 2
T-1 0.27 Periodo actual - 1
Total 0.78

Periodo Real Pronostico Error Error2 |Error|


1990T1 11.70
1990T2 9.10
1990T3 8.10
1990T4 8.10 7.10 1.00 1.00 1.00
1991T1 5.40 6.42 -1.02 1.03 1.02
1991T2 8.20 5.58 2.62 6.86 2.62
1991T3 6.80 5.25 1.55 2.40 1.55
1991T4 5.70 5.70 -0.00 0.00 0.00
1992T1 4.00 5.15 -1.15 1.33 1.15
1992T3 4.10 4.10 -0.00 0.00 0.00
1993T4 1.90 3.33 -1.43 2.03 1.43
1994T1 1.30 2.59 -1.29 1.66 1.29
1994T2 2.50 1.56 0.94 0.89 0.94
1994T3 1.40 1.40 0.00 0.00 0.00
1994T4 3.00 1.52 1.48 2.19 1.48
1995T1 3.30 1.64 1.66 2.76 1.66
1995T2 0.20 2.24 -2.04 4.17 2.04
1995T3 2.30 1.70 0.60 0.36 0.60
1995T4 0.60 1.06 -0.46 0.21 0.46

ERROR CUADRATICO MEDIO (ECM) = 1.68

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 1.08


GRÁFICO

1000

900

800

700

600

500

400

300

200

100

0
1 2 3 4 5 6 7 8 9 10 11 12

DEMANDA PRONOSTICO 3 SEMANAS POND

ON 4 SEMANAS GRÁFICO
ON 3 y 4 SEMANAS GRÁFICO

4 semanas
Error2 |Error|

624.27 24.99
12,737.27 112.86
5,837.64 76.40
15,618.84 124.98
69,198.34 263.06
11,506.92 107.27
27,816.35 166.78
40,818.54 202.04
11,209.49 105.87
77,835.73 278.99
8,271.97 90.95
2,032.41 45.08
17,634.41 132.79
32,925.70 181.45
57,322.53 239.42
3,440.36 58.65
688.69 26.24
63.02 7.94
11,146.15 105.58
1,078.37 32.84
6,066.74 77.89
11,543.17 107.44
89,432.16 299.05
27,258.79 165.10
17,932.07 133.91
73.92 8.60

21,542.84

122.16

GRÁFICO

ON 3 y 5 SEMANAS

5 semanas
140
Error2 |Error|
120

100

495.01 22.25 80
359.42 18.96
7.61 2.76 60
5.21 2.28
450.03 21.21
6.17 2.48 40
0.69 0.83
178.46 13.36 20
504.66 22.46
241.20 15.53
0
19.34 4.40 1 2 3 4 5 6 7 8 9 10 11 12
27.09 5.20
Compras (Unids) PRONOSTICO 3 SEMANAS PRONOST
191.24

10.98
GRÁFICO

5 semanas 25

Error2 |Error| 20

15

10

8.07 2.84
0.78 0.89 5
1.09 1.05
4.37 2.09
0
0.03 0.16 Enero Febrero Marzo Abril Mayo Junio Julio Agosto S
1.19 1.09
4.37 2.09 Ventas de Chocolate en miles de unidades PRONOSTICO 3 SEM

2.84

1.46

GRÁFICO

800

700

600

500

400

300

200
500

400

300

200

100

0
trim- trim- trim- trim- trim- trim- trim- trim- trim- trim- trim- trim- trim- trim- trim- trim- trim- trim- trim- trim- trim- trim- trim- t
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3

Visitas 4 semanas
8 9 10 11 12 13 14 15 16 17

NOSTICO 3 SEMANAS PRONOSTICO 5 SEMANAS


Junio Julio Agosto Septiembre Octubre Noviembre Diciembre

unidades PRONOSTICO 3 SEM PROMEDIO 5 SEM


im- trim- trim- trim- trim- trim- trim- trim- trim- trim- trim-
1 2 3 4 1 2 3 4 1 2 3
PROMEDIO MOVIL PONDERADO
CÓMO HALLAR LOS PESOS PONDERADOS UTILIZANDO UN MODELO DE PROGRAMACIÓN LINEAL (SOLVER)

HALLAR EL PRONOSTICO DE VENTAS UTILIZANDO EL METODO DE PROMEDIO MOVIL PONDERADO CON 4 SEMANAS
CONSIDERANDO LOS SIGUIENTES PESOS POMDERADOS:

T-4 32% Periodo actual - 4


T-3 58% Periodo actual - 3
T-2 10% Periodo actual - 2
T-1 0% Periodo actual - 1
Total 100%

Pronostico
Ventas
Semana (Unid) 4 semanas Error Error2 |Error|

1 137
2 156
3 136
4 110
5 168 147.89 20.11 404.44 20.11
6 160 139.98 20.02 400.84 20.02
7 102 124.07 -22.07 486.93 22.07
8 160 148.38 11.62 135.00 11.62
9 178 156.98 21.02 441.84 21.02
10 127 126.46 0.54 0.29 0.54
11 146 142.90 3.10 9.61 3.10
12 100 167.21 -67.21 4,517.30 67.21
Total

ERROR CUADRATICO MEDIO (ECM) = 799.53

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 20.71


MÉTODO SUAVIZACIÓN EXPONENCIAL
EJERCICIO 1

SE NECESITA PREDECIR EL NÚMERO DE PERSONAS QUE ASISTIRÁN A UN TALLER DE LOGÍSTICA


MEDIANTE EL MODELO DE SUAVIZACION EXPONENCIAL CUYO VALOR DE ALFA (α) ES 0.10
EL PRONOSTICO PARA EL AÑO 1995 FUE DE 175
alfa = 0.02
AÑO VALOR REAL PRONOSTICO Error Error 2
|Error|
1995 180 180.00 - - -
1996 168 180.00 -12.00 144.00 12.00
1997 159 179.75 -20.75 430.56 20.75
1998 175 179.32 -4.32 18.64 4.32
1999 190 179.23 10.77 116.05 10.77
2000 179.45
Total

ERROR CUADRATICO MEDIO (ECM) = 141.85

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 9.57

EJERCICIO 2

HALLAR EL PRONOSTICO DE VENTAS UTILIZANDO EL METODO DE SUAVIZACIÓN EXPONENCIAL UTILIZANDO LOS VALORES DE A
QUE SE MUESTRAN EN EL CUADRO

alfa = 0.21
DEMANDA
SEMANA REAL PRONOSTICO Error Error2 |Error|
140.0
7 85.0 85.00 - - -
8 102.0 85.00 17.00 289.00 17.00 120.0
9 110.0 88.53 21.47 460.75 21.47
10 90.0 93.00 -3.00 8.99 3.00 100.0
11 105.0 92.37 12.63 159.40 12.63
12 95.0 95.00 -0.00 0.00 0.00 80.0
13 115.0 95.00 20.00 400.00 20.00
14 120.0 99.16 20.84 434.36 20.84 60.0
15 80.0 103.49 -23.49 551.89 23.49
40.0
16 95.0 98.61 -3.61 13.01 3.61
17 100.0 97.86 2.14 4.59 2.14
20.0

ERROR CUADRATICO MEDIO (ECM) = 211.09


-
7 8
DESVIACIÓN ABSOLUTA MEDIA (DAM) = 11.29

EJERCICIO 3

HALLAR EL PRONOSTICO DE VENTAS UTILIZANDO EL METODO DE SUAVIZACIÓN EXPONENCIAL UTILIZANDO LOS VALORES DE A
QUE SE MUESTRAN EN EL CUADRO

alfa = 0.36
PERÍODO VALOR REAL PRONOSTICO Error Error2 |Error|
0 197 197.00 - - -
1 206 197.00 9.00 81.00 9.00
2 245 200.26 44.74 2,001.40 44.74
400

350
400
3 185 216.48 -31.48 991.15 31.48
4 169 205.07 -36.07 1,300.93 36.07
5 162 191.99 -29.99 899.50 29.99 350
6 177 181.12 -4.12 16.96 4.12
7 207 179.63 27.37 749.39 27.37
8 216 189.55 26.45 699.61 26.45 300
9 193 199.14 -6.14 37.69 6.14
10 230 196.91 33.09 1,094.71 33.09
11 212 208.91 3.09 9.55 3.09 250
12 192 210.03 -18.03 325.07 18.03
13 162 203.49 -41.49 1,721.67 41.49
14 189 188.45 0.55 0.30 0.55 200
15 244 188.65 55.35 3,063.72 55.35
16 209 208.72 0.28 0.08 0.28
150
17 207 208.82 -1.82 3.31 1.82
18 211 208.16 2.84 8.07 2.84
19 210 209.19 0.81 0.66 0.81
100
20 173 209.48 -36.48 1,331.04 36.48
21 194 196.26 -2.26 5.09 2.26
22 234 195.44 38.56 1,487.01 38.56 50
23 156 209.42 -53.42 2,853.58 53.42
24 206 190.05 15.95 254.35 15.95
25 188 195.83 -7.83 61.37 7.83 0
1 2 3 4 5 6 7 8
26 162 192.99 -30.99 960.61 30.99
27 172 181.76 -9.76 95.20 9.76
28 210 178.22 31.78 1,010.00 31.78
29 205 189.74 15.26 232.82 15.26
30 244 195.27 48.73 2,374.27 48.73
31 218 212.94 5.06 25.61 5.06
32 182 214.77 -32.77 1,074.15 32.77
33 206 202.89 3.11 9.66 3.11
34 211 204.02 6.98 48.74 6.98
35 273 206.55 66.45 4,415.63 66.45
36 248 230.64 17.36 301.32 17.36
37 262 236.93 25.07 628.26 25.07
38 258 246.02 11.98 143.47 11.98
39 233 250.36 -17.36 301.54 17.36
40 255 244.07 10.93 119.48 10.93
41 303 248.03 54.97 3,021.46 54.97
42 282 267.96 14.04 197.10 14.04
43 291 273.05 17.95 322.17 17.95
44 280 279.56 0.44 0.20 0.44
45 255 279.72 -24.72 611.00 24.72
46 312 270.76 41.24 1,701.01 41.24
47 296 285.71 10.29 105.89 10.29
48 307 289.44 17.56 308.34 17.56
49 281 295.81 -14.81 219.24 14.81
50 308 290.44 17.56 308.41 17.56
51 280 296.81 -16.81 282.42 16.81
52 345 290.71 54.29 2,947.12 54.29

ERROR CUADRATICO MEDIO (ECM) = 769.10

EJERCICIO 4

HALLAR EL PRONOSTICO DE VENTAS UTILIZANDO EL METODO DE SUAVIZACIÓN EXPONENCIAL UTILIZANDO LOS VALORES DE A
QUE SE MUESTRAN EN EL CUADRO
alfa = 1.00
SEMANA DEMANDA PRONOSTICO Error Error2 |Error|
1 820 820.00 - - -
2 775 820.00 -45.00 2,025.00 45.00 900
3 680 775.00 -95.00 9,025.00 95.00 800
700
4 655 680.00 -25.00 625.00 25.00
600
5 750 655.00 95.00 9,025.00 95.00
500
6 802 750.00 52.00 2,704.00 52.00
400
7 798 802.00 -4.00 16.00 4.00 300
8 689 798.00 -109.00 11,881.00 109.00 200
9 775 689.00 86.00 7,396.00 86.00 100
0
ERROR CUADRATICO MEDIO (ECM) = 4,744.11 1 2

EJERCICIO 5

HALLAR EL PRONOSTICO DE VENTAS UTILIZANDO EL METODO DE SUAVIZACIÓN EXPONENCIAL UTILIZANDO LOS VALORES DE A
QUE SE MUESTRAN EN EL CUADRO

alfa = 1.00
Ventas reales
Mes (000) PRONOSTICO Error Error2 |Error|

Jan-01 4,890 4,890.00 - - -


Feb-01 4,910 4,890.00 20.00 400.00 20.00
Mar-01 4,970 4,910.00 60.00 3,600.00 60.00
Apr-01 5,010 4,970.00 40.00 1,600.00 40.00
May-01 5,060 5,010.00 50.00 2,500.00 50.00
Jun-01 5,100 5,060.00 40.00 1,600.00 40.00
Jul-01 5,050 5,100.00 -50.00 2,500.00 50.00
Aug-01 5,170 5,050.00 120.00 14,400.00 120.00
Sep-01 5,180 5,170.00 10.00 100.00 10.00
Oct-01 5,240 5,180.00 60.00 3,600.00 60.00
Nov-01 5,220 5,240.00 -20.00 400.00 20.00
Dec-01 5,280 5,220.00 60.00 3,600.00 60.00
Jan-02 5,330 5,280.00 50.00 2,500.00 50.00
Feb-02 5,380 5,330.00 50.00 2,500.00 50.00
Mar-02 5,440 5,380.00 60.00 3,600.00 60.00
Apr-02 5,460 5,440.00 20.00 400.00 20.00
May-02 5,520 5,460.00 60.00 3,600.00 60.00
Jun-02 5,490 5,520.00 -30.00 900.00 30.00
Jul-02 5,550 5,490.00 60.00 3,600.00 60.00
Aug-02 5,600 5,550.00 50.00 2,500.00 50.00
Sep-02 5,600.00

ERROR CUADRATICO MEDIO (ECM) = 2,695.00

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 45.50

EJERCICIO 6

HALLAR EL PRONOSTICO DE VENTAS UTILIZANDO EL METODO DE SUAVIZACIÓN EXPONENCIAL UTILIZANDO LOS VALORES DE A
ENCONTRAR EL VALOR DE ALFA MÁS ADECUADO

ALFA (α) = -
Tonelaje real
Trimestre descargado Pronostico Error Error2 |Error|

1 180 180.00 - - -
2 168 180.00 -12.00 144.00 12.00
3 159 180.00 -21.00 441.00 21.00
4 175 180.00 -5.00 25.00 5.00
5 190 180.00 10.00 100.00 10.00
6 205 180.00 25.00 625.00 25.00
7 180 180.00 - - -
8 182 180.00 2.00 4.00 2.00
9
Total

ERROR CUADRATICO MEDIO (ECM) = 167.38

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 9.38

EJERCICIO 7

HALLAR EL PRONOSTICO DE VENTAS UTILIZANDO EL METODO DE SUAVIZACIÓN EXPONENCIAL UTILIZANDO LOS VALORES DE A
ENCONTRAR EL VALOR DE ALFA MÁS ADECUADO

ALFA (α) = 0.21

Fecha Reales Pronostico Error Error2 |Error| 4,500


1980M1 2,411 2,410.73 - - -
1980M2 2,296 2,410.73 -114.76 13,170.55 114.76 4,000
1980M3 2,405 2,386.65 18.68 348.87 18.68
1980M4 2,459 2,390.57 68.13 4,641.06 68.13 3,500
1980M6 2,512 2,404.86 107.43 11,540.47 107.43
1980M6 2,468 2,427.41 40.90 1,672.49 40.90 3,000
1980M7 2,451 2,435.99 15.35 235.77 15.35
1980M8 2,516 2,439.21 76.56 5,861.79 76.56
2,500
1980M9 2,455 2,455.28 -0.00 0.00 0.00
1980M10 2,629 2,455.28 173.53 30,114.05 173.53
1980M11 2,582 2,491.70 90.31 8,155.94 90.31 2,000
1980M12 3,732 2,510.65 1,221.13 1,491,167.69 1,221.13
1981M1 2,666 2,766.92 -100.90 10,180.36 100.90 1,500
1981 M2 2,488 2,745.74 -257.83 66,478.59 257.83
1981M3 2,672 2,691.63 -20.13 405.35 20.13 1,000
1981M4 2,705 2,687.41 17.74 314.70 17.74
1981M5 2,790 2,691.13 99.20 9,840.43 99.20 500
1981M6 2,770 2,711.95 57.94 3,356.94 57.94
1981M7 2,801 2,724.11 77.01 5,930.85 77.01 -
1981M8 2,786 2,740.27 45.61 2,079.84 45.61 1 2 3
80M 80M 80M 80
1981M9 2,680 2,749.84 -70.26 4,937.09 70.26 19 19 19 19
1981M10 2,845 2,735.09 109.59 12,008.93 109.59
1981M11 2,812 2,758.09 53.94 2,909.28 53.94
1981M12 4,013 2,769.41 1,243.51 1,546,305.67 1,243.51
1982M1 3,030.37
Total

ERROR CUADRATICO MEDIO (ECM) = 134,652.36

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 170.02


GRÁFICO

200

190

180

170

160

150

140
1995 1996 1997 1998 1999 2000

DEMANDA PRONOSTICO SUAV EXPON

AL UTILIZANDO LOS VALORES DE ALFA

GRÁFICO

140.0

120.0

100.0

80.0

60.0

40.0

20.0

-
7 8 9 10 11 12 13 14 15 16 17

DEAMANDA PRONOSTICO SUAV EXPONENCIAL

AL UTILIZANDO LOS VALORES DE ALFA

GRÁFICO

400

350
400

350

300

250

200

150

100

50

0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

VALOR REAL PRONOSTICO

AL UTILIZANDO LOS VALORES DE ALFA


GRÁFICO

900
800
700
600
500
400
300
200
100
0
1 2 3 4 5 6 7 8 9

DEMANDA PRONOSTICO

AL UTILIZANDO LOS VALORES DE ALFA

5,800

5,600

5,400

5,200

5,000

4,800

4,600

4,400
01 01 r-01 r-01 -01 -01 l-01 -01 -01 t-01 -01 -01 -02 -02 r-02 r-02 -02 -02 l-02 -02 -02
n- eb- a y n Ju Aug S ep Oc v c n b y n Ju Aug S ep
Ja F M Ap Ma Ju No De Ja Fe M
a Ap Ma Ju

DEMANDA PRONOSTICO SUAV EXPONENC

AL UTILIZANDO LOS VALORES DE ALFA


AL UTILIZANDO LOS VALORES DE ALFA

4,500

4,000

3,500

3,000

2,500

2,000

1,500

1,000

500

-
1 2 3 4 6 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1
80M 80M 80M 80M 80M 80M 80M 80M 80M 0M 0M 0M 81M 1 M 81M 81M 81M 81M 81M 81M 81M 1M 1M 1M 82M
8
19 19 19 19 19 19 19 19 19 198 198 198 19 19 19 19 19 19 19 19 19 198 198 198 19

DEMANDA PRONOSTICO SUAV EXPON


2000

6 17
32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53

CO
2 2 2 2 2
-0 -0 -0 g-0 p-0
ay Jun J ul u e
M A S
8 9 0 1 2 1
M 1M M1 M1 M1 2M
8 1 1 1 8
19 198 198 198 19
MÉTODO SUAVIZACIÓN EXPONENCIAL
CÓMO HALLAR EL VALOR DE ALFA UTILIZANDO UN MODELO DE PROGRAMACIÓN LINEAL (SOLVER)

SE NECESITA PREDECIR EL NÚMERO DE PERSONAS QUE ASISTIRÁN A UN TALLER DE LOGÍSTICA


MEDIANTE EL MODELO DE SUAVIZACION EXPONENCIAL CUYO VALOR DE ALFA (α) ES 0.10
EL PRONOSTICO PARA EL AÑO 1995 FUE DE 175

alfa = 0.02
AÑO VALOR REAL PRONOSTICO Error Error 2
|Error|
1995 180 180.00 - - -
1996 168 180.00 -12.00 144.00 12.00
1997 159 179.75 -20.75 430.56 20.75
1998 175 179.32 -4.32 18.64 4.32
1999 190 179.23 10.77 116.05 10.77
2000 179.45
Total

ERROR CUADRATICO MEDIO (ECM) = 141.85

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 9.57


GRÁFICO

200

190

180

170

160

150

140
1 2 3 4 5 6

VALOR REAL PRONOSTICO


MÉTODO DE REGRESIÓN LINEA, CUADRÁTICO, EXPONENCIAL, LOGARITMICA, POLINOMICA

MÉTODO GRÁFICO
EJERCICIO 1 GRÁFICO

DEMANDA
1000
900
800 f(x) = − 4.21253746253746 x² + 71.1790709290709 x + 570.931818181818
700
600
500
400
300
200
100
0
1 2 3 4 5 6 7 8 9 10
DESARROLLAR UN PRONOSTICO DE REGRESIÓN PARA EL SIGUIENTE EJERCICIO
y = 16.416x + 698.71 y = 696.33e0.0215x
Lineal Exponencial
Semana # Unidades Pronostico Error Error 2
|Error| Pronostico Error
1 650 715.13 -65.13 4,241.40 65.13 711.46 -61.46
2 678 731.54 -53.54 2,866.75 53.54 726.93 -48.93
3 720 747.96 -27.96 781.65 27.96 742.72 -22.72
4 785 764.37 20.63 425.43 20.63 758.86 26.14
5 859 780.79 78.21 6,116.80 78.21 775.36 83.64
6 920 797.21 122.79 15,078.37 122.79 792.21 127.79
7 850 813.62 36.38 1,323.36 36.38 809.42 40.58
8 758 830.04 -72.04 5,189.47 72.04 827.02 -69.02
9 892 846.45 45.55 2,074.44 45.55 844.99 47.01
10 920 862.87 57.13 3,263.84 57.13 863.35 56.65
11 789 879.29 -90.29 8,151.56 90.29 882.12 -93.12
12 844 895.70 -51.70 2,673.10 51.70 901.29 -57.29
Total

ERROR CUADRATICO MEDIO (ECM) = 4,348.85

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 60.11

EJERCICIO 2 GRÁFICO

DEMANDA
200
180
160
140 f(x) = − 0.681818181818181 x² + 7.80769230769229 x + 126.181818181818
120
100
80
60
40
20
-
1 2 3 4 5 6 7 8 9
140 f(x) = − 0.681818181818181 x² + 7.80769230769229 x + 126.181818181818
120
100
80
60
40
20
-
1 2 3 4 5 6 7 8 9

DESARROLLAR UN PRONOSTICO DE REGRESIÓN PARA EL SIGUIENTE EJERCICIO


y = -1.0559x + 146.86 y = 146.46e-0.01x
Lineal Exponencial
Ventas
Semana (Unid)
Pronostico Error Error2 |Error| Pronostico Error

1 137 145.80 -8.80 77.51 8.80 145.00 -8.00


2 156 144.75 11.25 126.60 11.25 143.56 12.44
3 136 143.69 -7.69 59.17 7.69 142.13 -6.13
4 110 142.64 -32.64 1,065.13 32.64 140.72 -30.72
5 168 141.58 26.42 697.99 26.42 139.32 28.68
6 160 140.52 19.48 379.29 19.48 137.93 22.07
7 102 139.47 -37.47 1,403.90 37.47 136.56 -34.56
8 160 138.41 21.59 466.01 21.59 135.20 24.80
9 178 137.36 40.64 1,651.86 40.64 133.85 44.15
10 127 136.30 -9.30 86.51 9.30 132.52 -5.52
11 146 135.25 10.75 115.67 10.75 131.20 14.80
12 100 134.19 -34.19 1,168.90 34.19 129.90 -29.90
Total

ERROR CUADRATICO MEDIO (ECM) = 608.21

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 21.69

EJERCICIO 3 GRÁFICO

DEMANDA
1,600
1,400
1,200 f(x) = 0.0231556888606385 x² − 4.13540143810583 x + 1290.86748768473
1,000
800
600
400
200
-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

DESARROLLAR UN PRONOSTICO DE REGRESIÓN PARA EL SIGUIENTE EJERCICIO


y = -3.4176x + 1287 y = 1279.7e-0.003x
Lineal Exponencial
Compras
Semana (Unids)
Pronostico Error Error2 |Error| Pronostico Error

1 1,063 1,284 -221 48,656.60 220.58 1,275.87 -212.87


2 1,467 1,280 187 34,907.39 186.84 1,272.04 194.96
3 1,441 1,277 164 26,978.98 164.25 1,268.23 172.77
4 1,205 1,273 -68 4,668.93 68.33 1,264.44 -59.44
5 1,285 1,270 15 227.65 15.09 1,260.65 24.35
6 1,248 1,266 -18 342.04 18.49 1,256.87 -8.87
7 1,329 1,263 66 4,345.87 65.92 1,253.11 75.89
8 1,387 1,260 127 16,215.68 127.34 1,249.35 137.65
9 1,021 1,256 -235 55,338.61 235.24 1,245.61 -224.61
10 1,122 1,253 -131 17,114.92 130.82 1,241.88 -119.88
11 1,083 1,249 -166 27,691.09 166.41 1,238.16 -155.16
12 1,303 1,246 57 3,250.28 57.01 1,234.45 68.55
13 1,237 1,243 -6 31.04 5.57 1,230.75 6.25
14 1,421 1,239 182 33,068.11 181.85 1,227.07 193.93
15 1,361 1,236 125 15,691.07 125.26 1,223.39 137.61
16 1,242 1,232 10 93.73 9.68 1,219.73 22.27
17 1,187 1,229 -42 1,755.68 41.90 1,216.07 -29.07
18 1,479 1,225 254 64,270.77 253.52 1,212.43 266.57
19 1,061 1,222 -161 25,942.13 161.07 1,208.80 -147.80
20 1,128 1,219 -91 8,217.06 90.65 1,205.18 -77.18
21 1,298 1,215 83 6,850.81 82.77 1,201.57 96.43
22 1,197 1,212 -15 219.42 14.81 1,197.97 -0.97
23 1,035 1,208 -173 30,065.90 173.40 1,194.38 -159.38
24 1,142 1,205 -63 3,966.18 62.98 1,190.80 -48.80
25 1,245 1,202 43 1,887.03 43.44 1,187.23 57.77
26 1,009 1,198 -189 35,774.85 189.14 1,183.68 -174.68
27 1,388 1,195 193 37,355.30 193.28 1,180.13 207.87
28 1,384 1,191 193 37,130.52 192.69 1,176.60 207.40
29 1,044 1,188 -144 20,704.22 143.89 1,173.07 -129.07
30 1,210 1,184 26 651.68 25.53 1,169.56 40.44
Total

ERROR CUADRATICO MEDIO (ECM) = 18,780.45

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 114.92

EJERCICIO 4 GRÁFICO

Compras (Unids)
140

120

100 f(x) = − 0.0285087719298252 x² − 0.116744066047458 x + 107.397058823529

80

60

40

20

0
1 2 3 4 5 6 7 8 9 10 11 12

DESARROLLAR UN PRONOSTICO DE REGRESIÓN PARA EL SIGUIENTE EJERCICIO


y = -0.6299x + 109.02 y = 108.23e-0.006x
Lineal Exponencial
Compras
Semana (Unids)
Pronostico Error Error2 |Error| Pronostico Error

1 100 108.39 -8 70.39 8.39 108.88 -9


2 125 107.76 17 297.21 17.24 109.54 15
3 90 107.13 -17 293.45 17.13 110.20 -20
4 110 106.50 3 12.25 3.50 110.86 -1
5 105 105.87 -1 0.76 0.87 111.53 -7
6 130 105.24 25 613.03 24.76 112.20 18
7 85 104.61 -20 384.58 19.61 112.87 -28
8 102 103.98 -2 3.92 1.98 113.55 -12
9 110 103.35 7 44.21 6.65 114.24 -4
10 90 102.72 -13 161.82 12.72 114.92 -25
11 105 102.09 3 8.46 2.91 115.61 -11
12 95 101.46 -6 41.75 6.46 116.31 -21
13 115 100.83 14 200.75 14.17 117.01 -2
14 120 100.20 20 391.98 19.80 117.71 2
15 80 99.57 -20 383.04 19.57 118.42 -38
16 95 98.94 -4 15.54 3.94 119.14 -24
17 100 98.31 2 2.85 1.69 119.85 -20
Total

ERROR CUADRATICO MEDIO (ECM) = 172.12

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 10.67

EJERCICIO 5 GRÁFICO

DEMANDA
25
f(x) = 0.204295704295704 x² − 2.25724275724276 x + 21.7727272727273
20

15

10

0
1 2 3 4 5 6 7 8 9

DESARROLLAR UN PRONOSTICO DE REGRESIÓN PARA EL SIGUIENTE EJERCICIO


y = 0.3986x + 15.576 y = 15.49e0.0223x
Lineal Exponencial
Ventas de
Mes, del año Chocolate en Pronostico Error Error2 |Error| Pronostico Error
2011 miles de
unidades
1 Enero 20 15.97 4 16.20 4.03 15.84 4
2 Febrero 21 16.37 5 21.41 4.63 15.84 5
3 Marzo 15 16.77 -2 3.14 1.77 15.84 -1
4 Abril 14 17.17 -3 10.05 3.17 15.84 -2
5 Mayo 13 17.57 -5 20.88 4.57 15.84 -3
6 Junio 16 17.97 -2 3.87 1.97 15.84 0
7 Julio 17 18.37 -1 1.87 1.37 15.84 1
8 Agosto 18 18.76 -1 0.58 0.76 15.84 2
9 Septiembre 20 19.16 1 0.70 0.84 15.84 4
10 Octubre 20 19.56 0 0.19 0.44 15.84 4
11 Noviembre 21 19.96 1 1.08 1.04 15.84 5
12 Diciembre 23 20.36 3 6.97 2.64 15.84 7
Total
ERROR CUADRATICO MEDIO (ECM) = 7.25

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 2.27

EJERCICIO 6 GRÁFICO

DEMANDA
800

700

600 f(x) = 0.753441960338512 x² − 10.2233590164625 x + 375.299145299145


500

400

300

200

100

0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

DESARROLLAR UN PRONOSTICO DE REGRESIÓN PARA EL SIGUIENTE EJERCICIO


y = 10.873x + 273.33
Lineal
AÑO TRIM t Visitas Pronostico Error Error2 |Error|
2003 trim-1 1 500 284.20 216 46,568.35 215.80
trim-2 2 350 295.08 55 3,016.65 54.92
trim-3 3 250 305.95 -56 3,130.29 55.95
trim-4 4 400 316.82 83 6,918.58 83.18
2004 trim-1 5 450 327.70 122 14,958.51 122.31
trim-2 6 350 338.57 11 130.69 11.43
trim-3 7 200 349.44 -149 22,332.61 149.44
trim-4 8 300 360.31 -60 3,637.78 60.31
2005 trim-1 9 350 371.19 -21 448.89 21.19
trim-2 10 200 382.06 -182 33,145.84 182.06
trim-3 11 150 392.93 -243 59,016.44 242.93
trim-4 12 400 403.81 -4 14.49 3.81
2007 trim-1 13 550 414.68 135 18,311.77 135.32
trim-2 14 350 425.55 -76 5,708.10 75.55
trim-3 15 250 436.42 -186 34,754.28 186.42
trim-4 16 550 447.30 103 10,547.70 102.70
2008 trim-1 17 550 458.17 92 8,432.57 91.83
trim-2 18 400 469.04 -69 4,767.07 69.04
trim-3 19 350 479.92 -130 16,878.43 129.92
trim-4 20 600 490.79 109 11,926.82 109.21
2009 trim-1 21 750 501.66 248 61,671.27 248.34
trim-2 22 500 512.54 -13 157.15 12.54
trim-3 23 400 523.41 -123 15,229.78 123.41
trim-4 24 650 534.28 116 13,390.66 115.72
2010 trim-1 25 500 545.16 -45 2,038.97 45.15
trim-2 26 610 556.03 54 2,912.98 53.97
trim-3 27 580 566.90 13 171.58 13.10
Total

ERROR CUADRATICO MEDIO (ECM) = 14,822.90

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 100.58

EJERCICIO 7 GRÁFICO

DEMANDA
14.00
12.00
10.00 f(x) = 0.0289842252690549 x² − 1.10845643520566 x + 11.9324045407637
8.00
6.00
4.00
2.00
-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
DESARROLLAR UN PRONOSTICO DE REGRESIÓN PARA EL SIGUIENTE EJERCICIO
y = -0.5288x + 9.9035 y = 14.524e-0.15x
Lineal Exponencial
Periodo Real Pronostico Error Error2 |Error| Pronostico Error
1 1990T1 11.70 9.37 2 5.41 2.33 12.50 -1
2 1990T2 9.10 8.85 0 0.06 0.25 10.76 -2
3 1990T3 8.10 8.32 -0 0.05 0.22 9.26 -1
4 1990T4 8.10 7.79 0 0.10 0.31 7.97 0
5 1991T1 5.40 7.26 -2 3.46 1.86 6.86 -1
6 1991T2 8.20 6.73 1 2.16 1.47 5.91 2
7 1991T3 6.80 6.20 1 0.36 0.60 5.08 2
8 1991T4 5.70 5.67 0 0.00 0.03 4.37 1
9 1992T1 4.00 5.14 -1 1.31 1.14 3.77 0
10 1992T3 4.10 4.62 -1 0.27 0.52 3.24 1
11 1993T4 1.90 4.09 -2 4.78 2.19 2.79 -1
12 1994T1 1.30 3.56 -2 5.10 2.26 2.40 -1
13 1994T2 2.50 3.03 -1 0.28 0.53 2.07 0
14 1994T3 1.40 2.50 -1 1.21 1.10 1.78 -0
15 1994T4 3.00 1.97 1 1.06 1.03 1.53 1
16 1995T1 3.30 1.44 2 3.45 1.86 1.32 2
17 1995T2 0.20 0.91 -1 0.51 0.71 1.13 -1
18 1995T3 2.30 0.39 2 3.67 1.91 0.98 1
19 1995T4 0.60 -0.14 1 0.55 0.74 0.84 -0
Total

ERROR CUADRATICO MEDIO (ECM) = 1.78

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 1.11


MICA, POLINOMICA, POTENCIAL

81818

9 10 11 12

y = -4.2125x2 + 71.179x + 570.93


Exponencial Polinomica
Error 2
|Error| Pronostico Error Error2 |Error|
3,777.72 61.46 637.90 12.10 146.49 12.10
2,393.68 48.93 696.44 -18.44 339.96 18.44
516.35 22.72 746.55 -26.55 705.14 26.55
683.05 26.14 788.25 -3.25 10.54 3.25
6,996.14 83.64 821.51 37.49 1,405.31 37.49
16,330.86 127.79 846.35 73.65 5,423.73 73.65
1,646.36 40.58 862.77 -12.77 163.09 12.77
4,763.17 69.02 870.76 -112.76 12,715.27 112.76
2,210.03 47.01 870.33 21.67 469.65 21.67
3,208.88 56.65 861.47 58.53 3,425.76 58.53
8,670.61 93.12 844.19 -55.19 3,045.55 55.19
3,281.79 57.29 818.48 25.52 651.37 25.52

4,539.89 2,375.16

61.19 38.16

26.181818181818

8 9 10 11 12
26.181818181818

8 9 10 11 12

y = -0.6818x2 + 7.8077x + 126.18


Exponencial Polinomica
Error2 |Error| Pronostico Error Error2 |Error|

64.04 8.00 133.31 3.69 13.65 3.69


154.76 12.44 139.07 16.93 286.69 16.93
37.59 6.13 143.47 -7.47 55.75 7.47
943.55 30.72 146.50 -36.50 1,332.40 36.50
822.71 28.68 148.17 19.83 393.09 19.83
487.05 22.07 148.48 11.52 132.68 11.52
1,194.28 34.56 147.43 -45.43 2,063.49 45.43
615.06 24.80 145.01 14.99 224.81 14.99
1,948.84 44.15 141.22 36.78 1,352.51 36.78
30.50 5.52 136.08 -9.08 82.39 9.08
218.93 14.80 129.57 16.43 270.05 16.43
893.91 29.90 121.69 -21.69 470.59 21.69

617.60 556.51

21.81 20.03

DA

748768473

16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

y = 0.0232x2 - 4.1354x + 1290.9


Exponencial Polinomica
Error2 |Error| Pronostico Error Error2 |Error|

45,312.21 212.87 1,286.79 -223.79 50,080.98 223.79


38,007.53 194.96 1,282.72 184.28 33,958.38 184.28
29,847.96 172.77 1,278.70 162.30 26,340.45 162.30
3,532.56 59.44 1,274.73 -69.73 4,862.22 69.73
593.03 24.35 1,270.80 14.20 201.55 14.20
78.70 8.87 1,266.92 -18.92 358.07 18.92
5,759.82 75.89 1,263.09 65.91 4,344.26 65.91
18,946.75 137.65 1,259.30 127.70 16,306.88 127.70
50,449.82 224.61 1,255.56 -234.56 55,018.68 234.56
14,371.01 119.88 1,251.87 -129.87 16,865.18 129.87
24,074.34 155.16 1,248.22 -165.22 27,296.92 165.22
4,699.08 68.55 1,244.62 58.38 3,408.69 58.38
39.03 6.25 1,241.06 -4.06 16.49 4.06
37,610.53 193.93 1,237.55 183.45 33,653.32 183.45
18,936.52 137.61 1,234.09 126.91 16,106.40 126.91
496.16 22.27 1,230.67 11.33 128.31 11.33
845.16 29.07 1,227.30 -40.30 1,624.33 40.30
71,060.17 266.57 1,223.98 255.02 65,035.40 255.02
21,843.96 147.80 1,220.70 -159.70 25,504.92 159.70
5,956.15 77.18 1,217.47 -89.47 8,005.24 89.47
9,299.52 96.43 1,214.29 83.71 7,007.73 83.71
0.93 0.97 1,211.15 -14.15 200.22 14.15
25,401.40 159.38 1,208.06 -173.06 29,949.28 173.06
2,381.48 48.80 1,205.01 -63.01 3,970.71 63.01
3,336.99 57.77 1,202.02 42.98 1,847.71 42.98
30,512.05 174.68 1,199.06 -190.06 36,123.87 190.06
43,209.41 207.87 1,196.16 191.84 36,803.74 191.84
43,016.35 207.40 1,193.30 190.70 36,367.41 190.70
16,659.50 129.07 1,190.48 -146.48 21,457.74 146.48
1,635.58 40.44 1,187.72 22.28 496.49 22.28

18,930.46 18,778.05

115.28 114.78

10 11 12 13 14 15 16 17

y = -0.0285x2 - 0.1167x + 107.4


Exponencial Polinomica
Error2 |Error| Pronostico Error Error2 |Error|

78.88 8.88 107.2548 -7 52.63 7.25


239.12 15.46 107.0526 18 322.11 17.95
407.87 20.20 106.7934 -17 282.02 16.79
0.74 0.86 106.4772 4 12.41 3.52
42.59 6.53 106.104 -1 1.22 1.10
316.94 17.80 105.6738 24 591.76 24.33
776.87 27.87 105.1866 -20 407.50 20.19
133.44 11.55 104.6424 -3 6.98 2.64
17.94 4.24 104.0412 6 35.51 5.96
621.13 24.92 103.383 -13 179.10 13.38
112.66 10.61 102.6678 2 5.44 2.33
454.11 21.31 101.8956 -7 47.55 6.90
4.04 2.01 101.0664 14 194.15 13.93
5.23 2.29 100.1802 20 392.82 19.82
1,476.29 38.42 99.237 -19 370.06 19.24
582.51 24.14 98.2368 -3 10.48 3.24
394.11 19.85 100 10,000.00 100.00

333.20 759.51

15.11 16.39

7272727273

8 9 10 11 12

y = 0.2043x2 - 2.2572x + 21.773


Exponencial Polinomica

Error2 |Error| Pronostico Error Error2 |Error|

17.31 4.16 19.72 0 0.08 0.28


26.63 5.16 18.08 3 8.55 2.92
0.70 0.84 16.84 -2 3.39 1.84
3.38 1.84 16.01 -2 4.05 2.01
8.06 2.84 15.59 -3 6.73 2.59
0.03 0.16 15.58 0 0.17 0.42
1.35 1.16 15.98 1 1.03 1.02
4.67 2.16 16.79 1 1.46 1.21
17.31 4.16 18.01 2 3.97 1.99
17.31 4.16 19.63 0 0.14 0.37
26.63 5.16 21.66 -1 0.44 0.66
51.28 7.16 24.11 -1 1.22 1.11
14.56 2.60

3.25 1.37

75.299145299145

16 17 18 19 20 21 22 23 24 25 26 27

y = 275.34e0.0261x y = 0.7534x2 - 10.223x + 375.3


Exponencial Polinomica
Pronostico Error Error2 |Error| Pronostico Error Error2 |Error|
282.62 217 47,253.64 217.38 365.83 134 18,001.48 134.17
290.09 60 3,588.67 59.91 357.87 -8 61.90 7.87
297.77 -48 2,281.56 47.77 351.41 -101 10,284.31 101.41
305.64 94 8,903.88 94.36 346.46 54 2,866.27 53.54
313.72 136 18,571.74 136.28 343.02 107 11,444.72 106.98
322.02 28 783.01 27.98 341.08 9 79.49 8.92
330.53 -131 17,038.88 130.53 340.66 -141 19,784.00 140.66
339.27 -39 1,542.41 39.27 341.73 -42 1,741.69 41.73
348.25 2 3.08 1.75 344.32 6 32.28 5.68
357.45 -157 24,791.76 157.45 348.41 -148 22,025.53 148.41
366.91 -217 47,048.37 216.91 354.01 -204 41,619.43 204.01
376.61 23 547.15 23.39 361.11 39 1,512.15 38.89
386.57 163 26,710.16 163.43 369.73 180 32,498.86 180.27
396.79 -47 2,189.29 46.79 379.84 -30 890.69 29.84
407.28 -157 24,737.74 157.28 391.47 -141 20,013.76 141.47
418.05 132 17,410.18 131.95 404.60 145 21,140.46 145.40
429.11 121 14,615.08 120.89 419.24 131 17,097.76 130.76
440.45 -40 1,636.55 40.45 435.39 -35 1,252.28 35.39
452.10 -102 10,424.71 102.10 453.04 -103 10,617.32 103.04
464.06 136 18,480.59 135.94 472.20 128 16,332.84 127.80
476.33 274 74,896.36 273.67 492.87 257 66,117.69 257.13
488.92 11 122.68 11.08 515.04 -15 226.19 15.04
501.85 -102 10,373.98 101.85 538.72 -139 19,243.13 138.72
515.12 135 18,191.67 134.88 563.91 86 7,412.11 86.09
528.75 -29 826.29 28.75 590.60 -91 8,208.36 90.60
542.73 67 4,525.64 67.27 618.80 -9 77.45 8.80
557.08 23 525.38 22.92 648.51 -69 4,693.29 68.51
14,741.50 13,158.35

99.71 94.49

407637

13 14 15 16 17 18 19

y = 0.029x2 - 1.1085x + 11.932


Exponencial Polinomica
Error2 |Error| Pronostico Error Error2 |Error|
0.64 0.80 10.85 1 0.72 0.85
2.75 1.66 9.83 -1 0.53 0.73
1.35 1.16 8.87 -1 0.59 0.77
0.02 0.13 7.96 0 0.02 0.14
2.13 1.46 7.11 -2 2.94 1.71
5.27 2.29 6.33 2 3.52 1.87
2.95 1.72 5.59 1 1.46 1.21
1.76 1.33 4.92 1 0.61 0.78
0.06 0.23 4.30 -0 0.09 0.30
0.74 0.86 3.75 0 0.12 0.35
0.79 0.89 3.25 -1 1.82 1.35
1.21 1.10 2.81 -2 2.27 1.51
0.19 0.43 2.42 0 0.01 0.08
0.14 0.38 2.10 -1 0.49 0.70
2.16 1.47 1.83 1 1.37 1.17
3.93 1.98 1.62 2 2.82 1.68
0.87 0.93 1.47 -1 1.61 1.27
1.75 1.32 1.38 1 0.86 0.92
0.06 0.24 1.34 -1 0.55 0.74

1.51 1.18

1.07 0.95
MÉTODO DE ESTACIONALIDAD
EJERCICIO 1

ASUMA QUE EN AÑOS ANTERIORES UNA EMPRESA HA COMPRADO EN PROMEDIO 1,000 UNIDADES POR AÑO DE UN PRODUCTO. E
COMPRÓ 350 UNIDADES EN VERANO, 300 EN OTOÑO, 150 EN INVIERNO Y 200 EN PRIMAVERA.
EFECTUAR UN PRONÓSTICO CON ESTACIONALIDAD PARA EL PRÓXIMO AÑO TENIENDO EN CUENTA QUE SE ESPERA UNA COMPRA
UNIDADES.

A) INFORMACIÓN
450

Ventas Promedio por Factor de 400


anteriores estación estacionalidad FCTOR DE ESTACIONALIDAD = VENTA

350
Verano 350 250.00 1.40
Otoño 300 250.00 1.20 300
Invierno 150 250.00 0.60
Primavera 200 250.00 0.80 250
Total 1,000 250.00
200
B) CÁLCULO DEL PRONÓSTICO
150

Ventas Promedio por Factor de Pronóstico 100


estimadas estación estacionalidad próximo año
para el año 50
Verano 275.00 1.40 385.00
Otoño 275.00 1.20 330.00 -
Verano
Invierno 275.00 0.60 165.00
Primavera 275.00 0.80 220.00 DEMANDA
Total 1,100.00 275.00 1,100.00

EJERCICIO 2

CALCULAR EL PRONOSTICO PARA LOS SIGUIENTES 4 TRIMESTRES UTILIZANDO ESTACIONALIDAD

Prom. 4 Prom. Indice


Año ID Año/Trim Ventas trimestres Centrado estacional

1 1 1 4
1 2 2 2
1 3 3 1
1 4 4 5
2 5 1 6 3.00
2 6 2 4 3.50 3.25 1.23
2 7 3 4 4.00 3.75 1.07
2 8 4 14 4.75 4.38 3.20
3 9 1 10 7.00 5.88 1.70
3 10 2 3 8.00 7.50 0.40
3 11 3 5 7.75 7.88 0.63
3 12 4 16 8.00 7.88 2.03
4 13 1 12 8.50 8.25 1.45
4 14 2 9 9.00 8.75 1.03
4 15 3 7 10.50 9.75 0.72
4 16 4 22 11.00 10.75 2.05
5 17 1 18 12.50 11.75 1.53
5 18 2 10 14.00 13.25 0.75
5 19 3 13 14.25 14.13 0.92
5 20 4 35 15.75 15.00 2.33

Cálculo del índice estacional corregido

Indice Indice
Trimestre estacional (IE) estacional
corregido
1 1.56 1.11
2 0.85 0.60
3 0.83 0.59
4 2.40 1.70
Suma 5.65 4.00

Cálculo del Pronostico


y = 0.9331x + 0.0275
Pronostico Factor de Pronostico
Año ID Año/Trim demanda sin estacionalidad con
estacionalidad estacionalidad

6 21 6/1 19.62 1.11 21.70


6 22 6/2 20.56 0.60 12.41
6 23 6/3 21.49 0.59 12.69
6 24 6/4 22.42 1.70 38.11

EJERCICIO 3 CASO COCA COLA

# de unidad Prom. 4 Prom. Indice o factor


Año Trimestre ID transportadas trimestres Centrado de
estacionalidad

2003 1 1 1,735
2003 2 2 2,245
2003 3 3 2,534
2003 4 4 2,155
2004 1 5 1,548 2,167.14
2004 2 6 2,104 2,120.39 2,143.76 0.98
2004 3 7 2,014 2,085.25 2,102.82 0.96
2004 4 8 1,992 1,955.39 2,020.32 0.99
2005 1 9 1,869 1,914.59 1,934.99 0.97
2005 2 10 2,314 1,994.89 1,954.74 1.18
2005 3 11 2,128 2,047.20 2,021.05 1.05
2005 4 12 2,027 2,075.69 2,061.44 0.98
2006 1 13 1,911 2,084.46 2,080.07 0.92
2006 2 14 2,331 2,094.85 2,089.65 1.12
2006 3 15 2,207 2,099.23 2,097.04 1.05
2006 4 16 2,174 2,118.79 2,109.01 1.03
2007 1 17 2,148 2,155.57 2,137.18 1.01
2007 2 18 2,739 2,214.99 2,185.28 1.25
2007 3 19 2,793 2,317.03 2,266.01 1.23
2007 4 20 2,556 2,463.58 2,390.30 1.07
2008 1 21 2,481 2,559.09 2,511.33 0.99
2008 2 22 3,040 2,642.26 2,600.67 1.17
2008 3 23 3,172 2,717.32 2,679.79 1.18
2008 4 24 2,879 2,812.16 2,764.74 1.04
2009 1 25 2,772 2,892.90 2,852.53 0.97
2009 2 26 3,550 2,965.66 2,929.28 1.21
2009 3 27 3,508 3,093.28 3,029.47 1.16
2009 4 28 3,244 3,177.25 3,135.26 1.03
2010 1 29 3,056 3,268.46 3,222.86 0.95
2010 2 30 3,899 3,339.46 3,303.96 1.18
2010 3 31 3,629 3,426.71 3,383.09 1.07
2010 4 32 3,373 3,456.96 3,441.84 0.98
2011 1 33 3,352 3,489.25 3,473.11 0.97
2011 2 34 4,342 3,563.25 3,526.25 1.23
2011 3 35 4,461 3,674.00 3,618.63 1.23
2011 4 36 4,017 3,882.00 3,778.00 1.06
2012 1 37 3,854 4,043.00 3,962.50 0.97
2012 2 38 4,936 4,168.50 4,105.75 1.20
2012 3 39 4,895 4,317.00 4,242.75 1.15
2012 4 40 4,333 4,425.50 4,371.25 0.99

Indice Indice
Trimestre estacional (IE) estacional
corregido
1 0.97 0.90
2 1.17 1.09
3 1.12 1.05
4 1.02 0.95
Total 4.28 4.00

Cálculo del Pronostico


y = 70.762x + 1454
Pronostico sin Pronostico con
Año ID Año/Trim estacionalidad estacionalidad

2013 41 1 4,355.24 3,936.96


2013 42 2 4,426.00 4,840.65
2013 43 3 4,496.77 4,716.22
2013 44 4 4,567.53 4,355.39

EJERCICIO 4

DETERMINAR EL PRONOSTICO SIGUIENDO UN MODELO DE ESTACIONALIDAD


# DE Prom. 6 Prom. Indice
SEMANA DÍA ID VEHICULOS períodos Centrado estacional

Semana 1 Lunes 1 10
Martes 2 20
Miércoles 3 15
Jueves 4 20
Viernes 5 30
Sábado 6 50
Semana 2 Lunes 7 12 24.17
Martes 8 23 24.50 24.33 0.95
Miércoles 9 19 25.00 24.75 0.77
Jueves 10 25 25.67 25.33 0.99
Viernes 11 36 26.50 26.08 1.38
Sábado 12 60 27.50 27.00 2.22
Semana 3 Lunes 13 11 29.17 28.33 0.39
Martes 14 25 29.00 29.08 0.86
Miércoles 15 19 29.33 29.17 0.65
Jueves 16 25 29.33 29.33 0.85
Viernes 17 37 29.33 29.33 1.26
Sábado 18 62 29.50 29.42 2.11
Semana 4 Lunes 19 14 29.83 29.67 0.47
Martes 20 29 30.33 30.08 0.96
Miércoles 21 21 31.00 30.67 0.68
Jueves 22 27 31.33 31.17 0.87
Viernes 23 41 31.67 31.50 1.30
Sábado 24 68 32.33 32.00 2.13
Semana 5 Lunes 25 13 33.33 32.83 0.40
Martes 26 26 33.17 33.25 0.78
Miércoles 27 20 32.67 32.92 0.61
Jueves 28 27 32.50 32.58 0.83
Viernes 29 38 32.50 32.50 1.17
Sábado 30 66 32.00 32.25 2.05

Indice Indice
DÍA estacional (IE) estacional
corregido
Lunes 0.42 0.47
Martes 0.89 0.99
Miércoles 0.68 0.76
Jueves 0.88 0.99
Viernes 1.28 1.43
Sábado 2.13 2.37
6.27 7.00

Cálculo del Pronostico


y = -0.0143x2 + 0.7099x + 18.796
Pronostico sin Pronostico con
Semana ID Día estacionalidad estacionalidad

6 31 Lunes 27.06 12.65


6 32 Martes 26.87 26.62
6 33 Miércoles 26.65 20.16
6 34 Jueves 26.40 26.04
6 35 Viernes 26.12 37.27
6 36 Sábado 25.82 61.25

EJERCICIO 5

DETERMINAR EL PRONOSTICO SIGUIENDO UN MODELO DE ESTACIONALIDAD

COMPRAS Prom. 4 Prom. Indice


AÑO TRIM ID (UNID) períodos Centrado estacional

2003 trim-1 1 500


trim-2 2 350
trim-3 3 250
trim-4 4 400
2004 trim-1 5 450 375.00
trim-2 6 350 362.50 368.75 0.95
trim-3 7 200 362.50 362.50 0.55
trim-4 8 300 350.00 356.25 0.84
2005 trim-1 9 350 325.00 337.50 1.04
trim-2 10 200 300.00 312.50 0.64
trim-3 11 150 262.50 281.25 0.53
trim-4 12 400 250.00 256.25 1.56
2007 trim-1 13 550 275.00 262.50 2.10
trim-2 14 350 325.00 300.00 1.17
trim-3 15 250 362.50 343.75 0.73
trim-4 16 550 387.50 375.00 1.47
2008 trim-1 17 550 425.00 406.25 1.35
trim-2 18 400 425.00 425.00 0.94
trim-3 19 350 437.50 431.25 0.81
trim-4 20 600 462.50 450.00 1.33
2009 trim-1 21 750 475.00 468.75 1.60
trim-2 22 500 525.00 500.00 1.00
trim-3 23 400 550.00 537.50 0.74
trim-4 24 650 562.50 556.25 1.17

Indice Indice
Trimestre estacional (IE) estacional
corregido
trim-1 1.52 1.38
trim-2 0.94 0.85
trim-3 0.67 0.61
trim-4 1.27 1.16
4.41 4.00

Cálculo del Pronostico


y = 1.3468x2 - 21.827x + 411.65
Pronostico sin Pronostico con
Años ID Trimestre estacionalidad estacionalidad

2010 25 trim-1 707.72 976.96


2010 26 trim-2 754.58 643.12
2010 27 trim-3 804.14 491.45
2010 28 trim-4 856.39 990.10
ADES POR AÑO DE UN PRODUCTO. EN PROMEDIO

NTA QUE SE ESPERA UNA COMPRA TOTAL DE 1,100

0TOR DE ESTACIONALIDAD = VENTA / PROMEDIO DE VTAS AÑO

Verano Otoño Invierno Primavera

DEMANDA PROM CENTRADO PRONOSTICO

GRÁFICO
40
Ventas sin
estacionalidad 35
3.62
3.31 30
1.69
2.94 25
5.43
6.62
6.77 20
8.24 f(x) = 0.933125850021682 x + 0.027461363012927
9.04 15
4.97
8.46 10
9.41
10.85
5

-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1
10

5
14.91
11.85
12.94 -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1
16.28
16.56 DEMANDA DEMANDA SIN ESTACIONALIDA
22.01 Linear (DEMANDA SIN ESTACIONALIDAD)
20.59

y = 70.762x + 1454

Ventas sin Pronostico sin Pronostico


6,000
estacionalidad estacionalidad con Error Error2 |Error|
estacionalidad

1,919.14 1,524.76 1,378.32 356.50 127,095.35 356.50


2,052.66 1,595.52 1,745.00 499.96 249,963.16 499.96
2,415.90 5,000
1,666.29 1,747.60 786.20 618,112.80 786.20
2,259.92 1,737.05 1,656.37 498.59 248,592.58 498.59
1,712.27 1,807.81 1,634.19 -86.37 7,459.34 86.37
1,924.15 1,878.57 2,054.56 49.85 2,484.95 49.85
1,920.63 1,949.33 f(x)
4,000 =2,044.46
70.7616691639868
-30.10 x 906.11
+ 1454.0484591306
30.10
2,088.76 2,020.10 1,926.27 65.47 4,286.65 65.47
2,067.63 2,090.86 1,890.05 -21.00 441.01 21.00
2,115.45 2,161.62 2,364.13 -50.50 2,549.80 50.50
2,029.29 2,232.38
3,000 2,341.33 -213.01 45,371.52 213.01
2,125.55 2,303.14 2,196.18 -169.35 28,678.61 169.35
2,113.60 2,373.91 2,145.91 -235.31 55,370.88 235.31
2,131.48 2,444.67 2,673.69 -342.53 117,325.02 342.53
2,103.88 2,515.43 2,638.19 -431.64 186,310.60 431.64
2,000
2,279.85 2,586.19 2,466.08 -292.11 85,328.66 292.11

1,000
2,000

2,376.52 2,656.95 2,401.78 -253.50 64,262.26 253.50


2,504.66 2,727.72 2,983.26 -243.95 59,511.23 243.95
2,662.80 2,798.48 2,935.05 -142.29 20,247.67 142.29
1,000
2,680.50 2,869.24 2,735.98 -179.97 32,389.49 179.97
2,744.56 2,940.00 2,657.64 -176.67 31,211.54 176.67
2,779.16 3,010.76 3,292.82 -253.30 64,160.43 253.30
3,024.51 3,081.53 3,231.91 -59.79 3,575.27 59.79
3,019.23 -
3,152.29 3,005.88 -126.88 16,099.01 126.88
1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334353637383940
3,066.51 3,223.05 2,913.51 -141.51 20,023.87 141.51
3,245.91 3,293.81 3,602.39
DEMANDA -52.39 2,744.39 52.39
DEMANDA SIN ESTACIONALIDAD
3,344.77 3,364.57 3,528.77 -20.77 431.42
Linear (DEMANDA SIN ESTACIONALIDAD) 20.77
PRONOSTICO CON ESTACIONALIDAD
3,401.86 3,435.34 3,275.78 -31.92 1,019.21 31.92
3,380.68 3,506.10 3,169.37 -113.37 12,852.66 113.37
3,565.02 3,576.86 3,911.95 -12.95 167.75 12.95
3,460.14 3,647.62 3,825.63 -196.63 38,664.12 196.63
3,537.29 3,718.38 3,545.69 -172.69 29,820.83 172.69
3,708.13 3,789.15 3,425.23 -73.23 5,363.13 73.23
3,970.07 3,859.91 4,221.52 120.48 14,516.24 120.48
4,253.43 3,930.67 4,122.49 338.51 114,586.89 338.51
4,212.65 4,001.43 3,815.59 201.41 40,566.32 201.41
4,263.47 4,072.19 3,681.10 172.90 29,895.36 172.90
4,513.19 4,142.96 4,531.08 404.92 163,958.99 404.92
4,667.23 4,213.72 4,419.35 475.65 226,238.78 475.65
4,544.04 4,284.48 4,085.49 247.51 61,260.57 247.51
2,833,844.49 8,341.68

ERROR CUADRATICO MEDIO (ECM) = 70,846.11

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 208.54

y = -0.0143x2 + 0.7099x + 18.796


Valor sin Pronostico sin Pronostico
estacionalidad estacionalidad con Error Error2 |Error|
estacionalidad
35.00
21.40 19.49 9.11 0.89 0.79 0.89
20.18 20.16 19.97 0.03 0.00 0.03
19.82 20.80 15.74 -0.74 0.54 0.74
20.28 21.41 21.11 -1.11 1.23 1.11 30.00
21.03 21.99 31.37 -1.37 1.87 1.37
21.08 22.54 53.47 -3.47 12.07 3.47
25.68 23.06 10.78 1.22 1.49 1.22 f(x) = − 0.01427250
23.21 23.56 23.34 -0.34 0.12 0.34 25.00 R² = 0.80626387154
25.11 24.03 18.18 0.82 0.67 0.82
25.35 24.47 24.13 0.87 0.76 0.87
25.23 24.87 35.49 0.51 0.26 0.51
25.29 25.26 59.91 0.09 0.01 0.09 20.00
23.54 25.61 11.97 -0.97 0.94 0.97
25.23 25.93 25.69 -0.69 0.48 0.69
25.11 26.23 19.84 -0.84 0.71 0.84
15.00
25.35 26.49 26.13 -1.13 1.27 1.13
25.94 26.73 38.14 -1.14 1.29 1.14
26.13 26.94 63.91 -1.91 3.66 1.91
29.96 27.12 12.68 1.32 1.75 1.32 10.00
29.27 27.27 27.02 1.98 3.90 1.98
27.75 27.40 20.73 0.27 0.07 0.27
27.38 27.49 27.11 -0.11 0.01 0.11
28.74 27.56 39.32 1.68 2.83 1.68 5.00
28.66 27.60 65.47 2.53 6.41 2.53
27.82 27.61 12.90 0.10 0.01 0.10
26.24 27.59 27.33 -1.33 1.78 1.33
26.43 27.54 20.84 -0.84 0.70 0.84 -
1 2 3 4 5
27.38 27.46 27.08 -0.08 0.01 0.08
26.64 27.36 39.03 -1.03 1.06 1.03
27.82 27.22 64.58 1.42 2.01 1.42

ERROR CUADRATICO MEDIO (ECM) = 1.62

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 1.03


y = 1.3468x2 - 21.827x + 411.65

Valor sin Pronostico sin Pronostico


estacionalidad estacionalidad con Error Error2 |Error|
estacionalidad

362.21 391.17 539.98 -39.98 1,598.44 39.98 700.00


410.66 373.38 318.23 31.77 1,009.52 31.77
409.06 358.29 218.97 31.03 962.90 31.03 f(x) = 1.34682164
345.98 345.89 399.90 0.10 0.01 0.10 600.00 R² = 0.783549013
325.99 336.18 464.08 -14.08 198.19 14.08
410.66 329.17 280.55 69.45 4,823.66 69.45
500.00
327.25 324.85 198.53 1.47 2.15 1.47
259.48 323.23 373.70 -73.70 5,431.63 73.70
253.55 324.30 447.67 -97.67 9,539.18 97.67
400.00
234.66 328.06 279.60 -79.60 6,336.00 79.60
245.44 334.52 204.44 -54.44 2,963.67 54.44
345.98 343.67 397.33 2.67 7.15 2.67 300.00
398.43 355.51 490.75 59.25 3,510.28 59.25
410.66 370.04 315.38 34.62 1,198.42 34.62
409.06 387.27 236.68 13.32 177.33 13.32 200.00
475.72 407.20 470.78 79.22 6,275.72 79.22
398.43 429.82 593.33 -43.33 1,877.40 43.33
469.33 455.13 387.90 12.10 146.51 12.10 100.00
572.69 483.13 295.27 54.73 2,995.76 54.73
518.97 513.83 594.06 5.94 35.26 5.94
-
543.31 547.22 755.40 -5.40 29.14 5.40 1 2 3 4
586.66 583.31 497.14 2.86 8.17 2.86
654.50 622.09 380.19 19.81 392.49 19.81
562.21 663.56 767.17 -117.17 13,728.74 117.17

ERROR CUADRATICO MEDIO (ECM) = 2,635.32

DESVIACIÓN ABSOLUTA MEDIA (DAM) = 39.32


13 14 15 16 17 18 19 20
13 14 15 16 17 18 19 20

DEMANDA SIN ESTACIONALIDAD


3637383940

LIDAD
ONALIDAD
DEMANDA SIN ESTACIONALIDAD

f(x) = − 0.0142725028377934 x² + 0.709904507005947 x + 18.7962968960134


R² = 0.806263871549002

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
DEMANDA SIN ESTACIONALIDAD
0

f(x) = 1.34682164054651 x² − 21.8272619318175 x + 411.652195098833


0 R² = 0.78354901316972

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30
22 23 24

También podría gustarte