1 DATOS
CARGAS VIVAS:
PV = 34.44 Tn
MV = 0.07 Tn-m
CARGA MUERTA:
Pm = 99.59 Tn
Mm = 0.15 Tn-m
CARGAS DE SISMO:
PSY = 7.63 Tn
MSY = 15.13 Tn-m
PROPIEDADES:
F'c = 210.00 Kg/Cm2
Fy = 4200.00 Kg/Cm2
Df = 1.50 m
σt = 0.50 Kg/Cm2
COLUMNA:
a = 0.40 m
b = 0.60 m
2 DISEÑO
A) DIMENCIONAMIENTO PARA CARGAS DE GRAVEDAD.
A.1) POR ESPUERZOS.
𝝈_(𝒕−𝒓𝒆𝒔𝒊𝒔𝒕𝒆𝒏𝒕𝒆)=𝝈_𝒕
4 5.00%
% = Interpolando
% = 15.00% Pt = 154.13 Tn
Remmplazando en la ecuacion N° 01
154.134155 ≤ 5.00 Tn/m2 .(02)
B*L
Remmplazando en la ecuacion N° 02
154.134155 ≤ 5.00 Tn/m2 .(03)
(L - 0.2)*L
〖𝑃𝑡 /(𝐵∗𝐿)∓(6∗𝑀)/(𝐵∗𝐿^2)≤𝜎 〗 _𝑡
M=𝑀𝑚+𝑀𝑣
M = 0.22 Tn-m
P = 134.03 Tn
σadmisible = 5.01 Tn/m2
σt = 5.00 Tn/m2
Como: σt ≤ σadmisible
No Cumple!!! En Multiplos de 0.05m aumenta x
x = 0.05 m Ya que no cumple incrementamos la sección
L1 = 5.70 m
B1 = 5.50 m
P = 141.66 Tn
Pt= 162.91 Tn
M = 15.35 Tn/m2
〖𝑃𝑡 /(𝐵∗𝐿)∓(6∗𝑀)/(𝐵∗𝐿^2)≤𝜎 〗 _𝑡𝑠
b) Segunda Combinación:
𝑃𝑢=1.25(𝑃𝑚+𝑃𝑣)+𝑃𝑠
Pu = 175.17 Tn 𝜎_𝑢=𝑃𝑢/(𝐵∗𝐿)∓(6∗𝑀𝑢)/(𝐵∗𝐿^2)
M𝑢=1.25(𝑀𝑚+𝑀𝑣)+𝑀𝑠
Mu = 15.40 Tn/m2 σu1 = 6.10 Tn/m2
c) Tercera Combinación:
𝑃𝑢=0.9∗𝑃𝑚+𝑃𝑠)
Pu = 97.26 Tn 𝜎_𝑢=𝑃𝑢/(𝐵∗𝐿)∓(6∗𝑀𝑢)/(𝐵∗𝐿^2)
M𝑢=0.9∗𝑀𝑚+𝑀𝑠
Mu = 15.26 Tn/m2 σu1 = 3.61 Tn/m2
Sabemos que hay cinco combinaciones, pero los mas representativos son los primeros tres, por esta razón, solo se
hace tres combinaciones
Finalmente:
Escogemos el esfuerzo ultimoi maximo.
σu = 6.33 Tn/m2 Primera Combinación!!!
SECCIÓN CRÍTICA
Área de punzonamiento
A0 = (a+d)(b+d)
A0 = (0.4+d)(0.6+d)
Perímetro de punzonamiento
b0 = 2*(a+d+b+d)
b0 = 4d+2(0.4+0.6)
b0 = 4d+(2)
Se Tiene:
𝑉_𝑢=𝜎_𝑢 (𝐿_1∗𝐵_1−𝐴_0 )
Vu = 6.33 (5.5*5.7- (0.4+d)(0.6+d)) Ec. (a)
∅𝑉_𝑐=0.85[1.06∗√(𝑓_𝑐^′ )∗𝑏_0∗𝑑]
d1 = 0.41 m
d2 = -0.91 m
𝑉_𝑢=[𝜎_𝑢∗𝐿_1/2−(𝜎_𝑢∗(𝑑+𝑏/2))]∗𝐵_1
〖∅𝑉〗 _𝑐=0.85∗0.53√𝐹𝑐∗𝑑∗𝐵_1*10
〖 1) 𝐿 〗 _𝑑≥0.08∗(𝐴𝑏∗𝐹𝑦)/√(𝐹^′ 𝑐)
= 44.0 Cm
〖 2) 𝐿 〗 _𝑑≥0.004∗𝐴𝑏∗𝐹𝑦 = 32.0 Cm
〖 3) 𝐿 〗 _𝑑≥0.20 𝑚 = 20.0 Cm
Ld = 44.00 Cm
0.45 Cm 0.45
Finalmente el peralte final de la zapata sera:
d1 = 0.45 m
ℎ=𝑑+0.1
h1 = 0.55 m
C) DISEÑO DEL REFUERZO POR FLEXIÓN (As):
C.1)EN LA DIRECCIÓN MÁS LARGA "L":
Volado
𝐿_𝑣=(𝐿_1−𝑏)/2
Lv = 2.55 m
Ancho Unitario
bz = 1.00 m
Momento Ultimo
𝑀_𝑢=𝜎_𝑢 (𝐿_𝑣^2)/2
Mu = 20.58 Tn-m
𝐾_𝑢=𝑀_𝑢/(𝑏_𝑧∗ 〖𝑑 ^2 〗 _1 )
Ku = 13.96
𝐴_𝑠=𝜌∗𝑏_𝑧∗𝑑_1
As = Area de acero por ancho unitario.
As = 17.41 Cm2
𝑎=𝑑−√(𝑑^2−(2∗𝑀𝑢∗10^5)/(0.85∗∅∗𝑓^′ 𝑐∗𝑏)) 𝐴𝑠=(0.85∗𝑓^′ 𝑐∗𝑎∗𝑏)/𝑓𝑦
Volado
𝐿_𝑣=(𝐵_1−𝑎)/2
Lv = 2.55 m
Ancho Unitario
bz = 1.00 m
Momento Ultimo
𝑀_𝑢=𝜎_𝑢 (𝐿_𝑣^2)/2
Mu = 20.58 Tn-m
𝐾_𝑢=𝑀_𝑢/(𝑏_𝑧∗ 〖𝑑 ^2 〗 _1 )
Ku = 13.96
Ku r
13.72 0.38%
13.96 0.39% r= 0.39%
14.41 0.40%
𝐴_𝑠=𝜌∗𝑏_𝑧∗𝑑_1
As = Area de acero por ancho unitario.
As = 17.41 Cm2
S = 22.79 Cm S = 15.82 Cm
Pnb = 428.400 Tn
2) 𝐿_𝑑≥0.08 db 𝑓𝑦
f'c (kg/cm2
3) 𝐿_𝑑≥0.20 𝑚 (𝑜𝑗𝑜) 210.00 Kg/Cm
BARRA Db (cm) Ab (cm2) Ld (cm)
8 mm 0.8 0.5 19
3/8 0.95 0.71 22
1/2 1.27 1.29 29
5/8 1.59 2 37
3/4 1.91 2.84 44
7/8 2.22 3.87 52
1 2.54 5.1 59
1 3/8 3.58 10.06 83
𝐾𝑢=𝑀𝑢/ 〖𝑏𝑑〗 ^2
1 2 Ku pho
1 pho Ku 13.72 0.38%
2 0.10% 3.74 Ku = 13.96
3 0.12% 4.47 14.41 0.40%
4 0.14% 5.2
5 0.16% 5.93
6 0.18% 6.66
7 0.20% 7.38
8 0.22% 8.1
9 0.24% 8.82
10 0.26% 9.53
11 0.28% 10.23
12 0.30% 10.94
13 0.32% 11.64
14 0.34% 12.34
15 0.36% 13.03
16 0.38% 13.72
17 0.40% 14.41
18 0.42% 15.09
19 0.44% 15.77
20 0.46% 16.44
21 0.48% 17.12
22 0.50% 17.78
23 0.52% 18.45
24 0.54% 19.11
25 0.56% 19.77
26 0.58% 20.42
27 0.60% 21.07
28 0.62% 21.72
29 0.64% 22.37
30 0.66% 23.01
31 0.68% 23.64
32 0.70% 24.27
33 0.72% 24.9
34 0.74% 25.53
35 0.76% 26.15
36 0.78% 26.77
37 0.80% 27.39
38 0.82% 28
39 0.84% 28.6
40 0.86% 29.21
41 0.88% 29.81
42 0.90% 30.41
43 0.92% 31
44 0.94% 31.59
45 0.96% 32.18
46 0.98% 32.76
47 1.00% 33.34
48 1.02% 33.92
49 1.04% 34.49
50 1.06% 35.06
51 1.08% 35.62
52 1.10% 36.18
53 1.12% 36.74
54 1.14% 37.3
55 1.16% 37.85
56 1.18% 38.39
57 1.20% 38.94
58 1.22% 39.48
59 1.24% 40.01
60 1.26% 40.55
61 1.28% 41.08
62 1.30% 41.6
63 1.32% 42.12
64 1.34% 42.64
65 1.36% 43.16
66 1.38% 43.67
67 1.40% 44.18
68 1.42% 44.68
69 1.44% 45.18
70 1.46% 45.68
71 1.48% 46.17
72 1.50% 46.66
73 1.52% 47.15
74 1.54% 47.63
75 1.56% 48.11
76 1.58% 48.59
77 1.60% 49.06 0.75 Asb
78 1.62% 49.53
79 1.64% 50
80 1.66% 50.46
81 1.68% 50.91
82 1.70% 51.37
83 1.72% 51.82
84 1.74% 52.27
85 1.76% 52.71
86 1.78% 53.15
87 1.80% 53.59
88 1.82% 54.02
89 1.84% 54.45
90 1.86% 54.88
91 1.88% 55.3
92 1.90% 55.72
93 1.92% 56.13
94 1.94% 56.54
95 1.96% 56.95
96 1.98% 57.36
97 2.00% 57.76
98 2.02% 58.16
99 2.04% 58.55
100 2.06% 58.94
101 2.08% 59.33
102 2.10% 59.71
103 2.12% 60.09 Asb
104 2.14% -----
105 2.16% -----
Para el diseño: Entrar a la tabla con Ku=Mu/(bd^2), leer el valor de ρ y calcular As=ρbd
Para el analisis: Entrar a la tabla con ρ=As/bd leer el valor de Ku y calcular Mu=Kubd^2
ON - NORMA PERUANA E-060 x
L 5.7 0.3
B 5.5 0.3
a 0.4 2.85
b 0.6 2.85
h 0.55 -2.85
f'c (kg/cm2) d 0.45 -2.85
280.00 Kg/Cm 350.00 Kg/Cm 420.00 Kg/Cm Df 0.5 -0.3
Ld (cm) Ld (cm) Ld (cm) -0.3
16 14 13 -2.85
19 17 16 -0.285
26 23 21 0
32 29 27 0
38 34 32 0.285
45 40 37 2.85
51 46 43 0
72 64 60 0
y
0
-1.5
-1.5
-2.05 Chart Title
-2.05
-1.5 1
-1.5
0
0 0.5
0
-0.3
0.3 0
-4 -3 -2 -1 0 1 2 3
0
0
0.5 -0.5
0.3
-1
-1.5
-2
-2.5
2 3 4
DISEÑO DE ZAPATAS COMBINADAS
Aplicación 6.- Diseñar la cimentacion de la estructura
1 DATOS
Distancia entre caras de las columnas : 4.5 m
COLUMNA EXCENTRICA 01 COLUMNA CENTRICA 02
CARGAS VIVAS: CARGAS VIVAS:
PV = 25.00 Tn PV = 40.00 Tn
MV = 0.00 Tn-m MV = 0.00 Tn-m
COLUMNA: COLUMNA:
a1 = 0.50 m a2 = 0.80 m
b1 = 0.35 m b2 = 0.35 m
2 DISEÑO
A) DIMENSIONAMIENTO PARA CARGAS DE GRAVEDAD.
A.1) POR ESPUERZOS.
𝝈_(𝒕−𝒓𝒆𝒔𝒊𝒔𝒕𝒆𝒏𝒕𝒆)=𝝈_𝒕
P1 = 115.00 Tn P2 = 200.00 Tn
P2t = 220.00 Tn
R=P1t+P2t
R= 346.5 ton
COLUMNA 01 COLUMNA 02
P1t P2t
a1 a2
b1 4.5 b2 B
R
S Fi=0
L=2(P1t*a1/2+P2t*(a1+4.5+a2/2))/R
Usamos
L= 7m
B= 2.6 m
M= Mm+Mv
M= 0.00
s= 19.0385 ≤ 20.00 Tn/m2 Cumple
Rs= (P1t+P2t+P1s+P2s)*1.1
Rs= 346.5 ton
Ms= Mm+Mv+Ms
M= 0.00
s= 19.0385 ≤ 26.00 Tn/m2 Cumple
x1=L/2-a1/2 m=L-(4.5-a1-a2) L
x1 = 3.25 m= 1.2
x2=L/2-a2/2-m
x2 = 1.90
MR=Pu1*x1-Pu2*x2-Mu1-Mu2 s = (Pu1+Pu2)/(B*L)+6*MR/(B*L*L)
SECCIÓN CRÍTICA
Área de punzonamiento
A0 = (a+d)(b+d)
Perímetro de punzonamiento
b0 = 2*(a+d)+2*(b+d)
Area de punzonamiento
A0 = (b+d)(a+d)
Se Tiene:
A0 = (b+d)(a+d)
b0 = 2*(a+d)+2*(b+d)
〖
𝑃𝑢 2−𝜎 〗 _𝑢 (𝐴_0 )=0.85[1.06∗√(𝐹_𝑐^′ )∗𝑏_0∗𝑑]*10
〖
𝑃𝑢 2−𝜎 〗 _𝑢 (𝑏+𝑑)∗(𝑎+𝑑)−0.85[1.06∗√(𝐹_𝑐^′ )∗(2∗(𝑎+𝑑)+2∗(𝑏+𝑑))∗𝑑]*10 = 0
〖
𝑃𝑢 2−𝜎 〗 _𝑢 (𝑏+𝑑)∗(𝑎+𝑑)−0.85[1.06∗√(𝐹_𝑐^′ )∗(2∗(𝑎+𝑑)+2∗(𝑏+𝑑))∗𝑑]*10 = 0
d 〖
𝑃𝑢 2−𝜎 〗 _𝑢 (𝑏+𝑑)∗(𝑎+𝑑)−0.85[1.06∗√(𝐹_𝑐^′ )∗(2∗(𝑎+𝑑)+2∗(𝑏+𝑑))∗𝑑]*10 d->0
0.48 0.58 0.58 -d
L
qu
200
186.51
150
100
50
16.48
0 0 0.00
0 1 2 3 4 5 6 7 8
-50
-100 -105.49
-150 -152.02
-200
〖
∅𝑉〗 _𝑐=0.85∗0.53√𝐹𝑐∗𝑑∗B*10
Cortante Vi a una distancia d=0.56 m
øVc= 95.053 ton Si ø*Vc > Vu =====> ok Vi=186.51-(186.51+152.02)*(0.4+0.56)/(5.4-0.25)
Vi= 123.405 ton
Vs=(Vi/0.85-Vc) ø*Vc < Vi =====> Acero por corte
Vs= 29.971 ton S=Aø*fy*d/Vs Elegimos acero de 1/2"
S= 19.93 ø 1/2 @ 0.175
B.3) LONGITUD DE ANCLAJE:
F'c = 210 Kg/C2 Ld = Longitud de Anclaje
Db = 3/4'' Db = Diametro de la Barra
Ab = 2.85 Cm2 Ab = Area de la Seccion
〖1) 𝐿 〗 _𝑑≥0.08∗(𝐴𝑏∗𝐹𝑦)/√(𝐹^′ 𝑐)
= 44.0 Cm
L
qu
100
50
0 0 2.06 0.00
0 1 2 3 4 5 6 7 8
-50
-100 -93.52
-150
Mu = 173.19 Tn-m
Mu = 93.52 Tn-m
a1+d/2= 0.78
B1= 0.78 m
Volado Lv=(B-b1)/2
Lv = 1.125 m
Ancho de Punzonamiento
B1 = 0.78 m
Momento Ultimo
𝑀_𝑢=𝑞𝑢∗𝐵1∗(𝐿_𝑣^2)/2
Mu = 32.54 Tn-m
Volado Lv=(B-b2)/2
Lv = 1.125 m
Ancho de Punzonamiento
B1 = 1.36 m
Momento Ultimo
𝑀_𝑢=𝑞𝑢∗𝐵1∗(𝐿_𝑣^2)/2
Mu = 56.74 Tn-m