Muro L 7.5M
Muro L 7.5M
• Material: Concreto
Peso especifico: 𝛾 2.4 Ton/m3
Resistencia a la compresion: 𝑓´ 280 kg/cm 2
Esfuerzo de fluencia del acero de refuerzo: 𝑓 4200 kg/cm 2
Coeficiente Sismico
Coeficiente sismico de aceleracion horizontal : PGA = 0.45
Factor del Lugar: F pga = 1.5
R= 1
AS = 0.68
DISEÑO Y CALCULO DE LA INGENIERIA Y DETALLE PARA MURO DE CONTENCIÓN
DATOS:
A GEOMETRIA DEL MURO
a=t1
h min
Hp = 7.50 m 0.40 q= s/c t/m2
h1= 2.500 m
t1= 0.40 m
Rec Muro 4 cm P
Rec Zpta 7.5 cm
A
B DATOS DEL TERRENO
N
g =(kg/m3) 1840 ## RELLENO
f =(º) 33º 33 Hp = 7.50 T
s t = (kg/cm2) 2.00
h= 8.40 A
C DATOS DEL C° Y ACERO
L
f´c=(kg/cm2) 280
f´y=(kg/cm2) 4,200 L
D FACTOR DE SEGURIDAD A
E SOBRECARGA ZAPATA d
1.- PREDIMENCIONAMIENTO:
a = 20 a 30 → Asumido = 0.40 m
b = H H
a
12 10
b = 8.40 8.40
ó
12 10
B = 0.5 H a 0.8 H
B = 0.5 8.40 ó 0.8 8.40 MUY ANCHO
B = 4.20 ó 6.72 → Asumido = 7.50 m
c = 1
B - 1/2 b = 2.13
3 MUY ANCHO
c = 2.13 → Asumido = 2.90 m
= b =
= b+5
d = = b + 10 0.85 → Asumido = 0.90 m
= b +15
= b + 20
DISEÑO Y CALCULO DE LA INGENIERIA Y DETALLE PARA MURO DE CONTENCIÓN
e = B-c-b
7.50 - 2.90 - 0.75
e = 3.85 m
0.40
W1
W3
7.50
8.40 F1
W5 Empuje
Activo
W2
h F2
W4 2
Empuje
Pasivo 2.90 0.40 0.35 3.85 H ⅓
W6 0.90
7.50
O g . H
Punto
de Volteo
2
PP = 15.68 Ton/m EH = 21.56 Ton/m
F1 = 5,749 Kg/cm2
UBICACIÓN : F1
F1 = H 7.50
= = 3.75 m
2 2
F2 = ( vol ) D . P
F2 = [ 1 (ү H ) (H) x 1.00 ] Ka
2
F2 = 1 ү h² x 1.00 x Ka
2
56.25
F2 = 1 2,600.00 kg/cm2 7.50 ² 1.00 0.295
2
F2 = 21,557.32 Kg
UBICACIÓN : F2
F2 = 1 H
3
1
F2 = 7.50 = 2.5 m
3
3.- ESTABILIDAD DEL MURO AL VOLTEO
∑ MFy
Fs V = ≥ 1.75
∑ MFh
DISEÑO Y CALCULO DE LA INGENIERIA Y DETALLE PARA MURO DE CONTENCIÓN
382,355.18 kg/m
Fs V = 5.07 > 1.75 OK CUMPLE
75,450.62 kg/m
ų∑ Fv ƒ Empuje
Fs D = ≥ 1.25
∑ Fh = ƒ Rozamiento
ų = tg Ø ≤ 0.60
0.60 89,823
Fs D = 1.97 > 1.25 OK CUMPLE
27,305.94
DISEÑO Y CALCULO DE LA INGENIERIA Y DETALLE PARA MURO DE CONTENCIÓN
382,355.18 - 75,450.62
x =
89,823
x = 3.42
R
£
e 7.50
3.75 3.75
2.50 2.50 2.50
3.75
x = 3.42
OK CUMPLE
2ro EXENTRICIDAD
B
e = - x
2
e = Exentricidad
R
£
e 7.50
B/3 B/3 B/3
B/6 B/6
7.50
e = - 3.42 e = 0.333
2
B 7.50
= = 1.25
6 6
ΣFy 6 e
q = ( 1 ± )
A B B
89,823 6 0.333
q = ( 1 ± )
1.00 7.50 7.50
q = 11,976.40 1 ± 0.266584
t_m
W1
7,728 kg
W3
2,415 kg
W2
##### kg
q1 = 1.64 kg/cm2
q2 = 1.21 kg/cm2
q3=1.29 kg/cm2
qmax = 1.52 kg/cm2
4.1.- EN LA PANTALLA
1.00 m
DIAGRAMA DE PRESIONES
q = tn-m
F1
7.50
F2
Y1
Y2
a) MOMENTO FLECTOR
En
F1 = ( q.h.1.00 m) . ka
F1 = 5,748.62 kg.
h 7.50
y1 = = = 3.75
2 2
y1 = 3.75 m
En
F2 = 1 ( g .h². 1.00m) Ka
2
F2 = 0.27 tn-m
1 1
y2 = h y2 = 7.50
3 3
y2 = 2.50 m
MOMENTO ULTIMO
b) FUERZA CORTANTE
V = F1 + F2
V = 5,748.62 + 269.47
V = 6,018.08 kg
V = 6,018.08
µ = V b = 1.00
b d d = 0.71
6,018.08
µ = = 0.85
100 71
µ = 0.85 kg/cm2
µc = Ø 0.53 √ f 'c
Empotramiento
a) MOMENTO FLECTOR
En:
F1 = 1.29 x 2.90 x 1.00
F1 = 37,459 Kg
DISEÑO Y CALCULO DE LA INGENIERIA Y DETALLE PARA MURO DE CONTENCIÓN
X1 = 2.90 =
1.45 m
2
En
F2 = 1 290 0.23 100 = 3265.54 Kg
2
F2 = 3265.54 kg
X2 = 2 2.90 =
3
X2 = 1.93 mt
MOMENTO MAXIMO
V = F1 + F2
V = 37,459 + 3265.54
V = 40,724.89 kg
ų = V
b d
ų = 40,724.89
290 71
ų = 1.98 kg/cm2
Vc = Ø 0.53 √ f'c
Vc = 7.54
DISEÑO Y CALCULO DE LA INGENIERIA Y DETALLE PARA MURO DE CONTENCIÓN
4.3.- EN EL TALON F1
X1
q1 = 1.64 kg/cm2
3.85 h = 0.90
0.33 kg/cm2
F1 = 63,273.00 kg
X1 = 3.85
2
X1 = 1.93 m
F2 = 33,817.19 kg
X2 = 3.85
2
X2 = 1.93 m
F3 = 6,309.87 kg
X3 = 1 3.85
3
X3 = 1.28 m
a. MOMENTO FLECTOR
M = (F2.X2)+(F3.X3)-(F1.X1)
M = 194,996.3 kg/cm2
b. FUERZA CORTANTE
>
V = F1 - F2 - F3
µ = V µ = 23,145.94
b d 100 71
µ = 3.26 kg/cm2
Vc = Ø 0.53 √ f'c
280
Vc = 0.85 0.53 16.73
2 As h 1 As h
3 3
Mu
Ku = As = ρ b d
b d²
Mu = 36
Mu = 35,570 kg/m
Acero principal:
As = ρ b d
USAR 20 Ø de 1 @ 0.160 ml
S = 1.98
x 100
9.90
Asumimos un Ø ≤ 5/8"
As min = 0.0020 b d
1) Arriba: (h = 0.4 )
a) Cara Interior
1 = 1 cm2/
Ash 8.00 = 2.67
3 3 m
As = 2.67 cm2
S = 1.27
x 100
8.87
b) Cara Exterior:
2 = 2
Ash 8 = 5.33 cm2/m
3 3
USAR 2 Ø de 1 @ 0.16 ml
a) Cara Interior:
1 = 1
Ash 11.50 = 3.83 cm2/m
3 3
As = 3.83 cm2 1.27
1.27
As = 11.50 10 Ø 1/2 = 12.67
OK CUMPLE
S = 1.27
x 100
12.67
b) Cara Exterior:
2 = 2
Ash 11.5 = 7.67 cm2/m
3 3
S = 1.27
x 100
8.87
DISEÑO Y CALCULO DE LA INGENIERIA Y DETALLE PARA MURO DE CONTENCIÓN
a) Cara Interior:
1 = 1
Ash 15.00 = 5.00 cm2/m
3 3
S = 1.27
x 100
6.33
b) Cara Exterior:
2 = 2
Ash 15.0 = 10.00 cm2/m
3 3
S = 1.27
x 100
10.13
Resumen
Acero Horizontal
Para Exterior:
Entonces:
C.I = Ø 1/2 @ 0.160 ≈ 0.16
C.E = Ø 1/2 @ 0.160 ≈ 0.16
5 DISEÑO DE LA ZAPATA.
a) MOMENTO ULTIMO
b = 1.00 mt
d = hz - (r + Ø vlla)
2
d = 90 - 7.5 + 1.58
2
d = 81.71
Acero principal:
As = ρ b d
Acero mínimo:
ZAPATA POSTERIOR
b = 1.00 mt
DISEÑO Y CALCULO DE LA INGENIERIA Y DETALLE PARA MURO DE CONTENCIÓN
d = 81.71
Acero principal:
As = ρ b d
S = 2.85
x 100
22.80
S = 2.85
x 100
17.10
0.5 t = 0.5 90 = 45
S ≤
45 cm
SE TOMA EL MENOR:
1.- PANTALLA:
* ACERO VERTICAL
- Cara Interior = Ø 1 @ 0.16 m Intercalado ó
= Ø 1 @ 0.16 m a una (h) d 3.30
- Cara Exterior = Ø 5/8 @ 0.16 m
* ACERO HORIZONTAL
- Cara Interior = Ø 1/2 @ 0.16 m
- Cara Exterior = Ø 1/2 @ 0.16 m
NIVEL DE RELLENO
Ø 1 @ 0.16
Ø 1 @ 0.160
NIVEL ACTUAL
3.30 0.160 0.160 0.160 0.160 0.160 0.160
Ø 3/4 @ 0.16
2.50
7.50
Ø 1/2 @ 0.16
Ø 5/8 @ 0.16
DETALLE DE PANTALLA
(PANTALLA RECTA)