Está en la página 1de 3

REPORTE DE

FECHA: 25 Abril del 2012


PLANTA DE P
TRATAMIENTO D

METALES TOTALES
Muestras del 24-04-12 Cu (g/m3) Fe (g/m3) Pb (g/m3) Zn (g/m3) Mn (g/m3) As (g/m3)
INGRESO OSMOSIS - 11 hrs. 0.74 1.32 <0.01 0.02 0.06 0.003
SOLUCION CONCENTRADA - 11 hrs. 0.72 0.05 0.01 0.03 0.02 <0.001
SOLUCION PERMEADA - 11 hrs. 0.02 <0.01 <0.01 0.02 0.01 <0.001

(*) Muestreo realizado por Planta


REPORTE DE LABORATORIO QUIMICO

PLANTA DE PROCESOS
TRATAMIENTO DE EFLUENTES

METALES DISUELTOS Au Ag
(g/m3) (g/m3)
Hg (g/m ) Cu (g/m ) Fe (g/m ) Pb (g/m ) Zn (g/m ) Mn (g/m )
3 3 3 3 3 3
As (g/m ) Hg (g/m )
3 3

0.020 0.47 0.08 <0.01 0.02 0.05 <0.001 0.018


0.018 0.72 0.04 0.01 0.03 0.02 <0.001 0.017
<0.001 0.01 <0.01 <0.01 0.02 <0.01 <0.001 <0.001
CN WAD CN Total
(g/m3) (g/m3)
0.190 0.205
0.503 0.513
0.017 0.043

También podría gustarte