Está en la página 1de 5

Cuadro de cubicación de obra ======> Mapocho 2 (Torre B + 100% subterraneo ambas torres)

Constructora ======> EUROCONSTRUCTORA


Fecha ======>
¿Productos deben cumplir con norma LEED? ==> No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 31 32
Ancho losa ====>
Terraza y
Tipo Piso ====> -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 cubierta
Cantidad de Pisos =============> 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 TOTAL
Zona M Obs Fam Espacios Comunes (partidas) Un
E/C EC49 4n Martelina fachada STD m² 387.4 215.87 215.87 215.87 215.87 215.87 215.87 215.87 215.87 215.87 215.87 215.87 262.09 215.83 215.83 215.83 215.83 215.83 215.83 215.83 215.83 215.83 224.23 572.21 5,762.9 6,284.9
E/C EC50 4n Martelina rasgos fachada (m.l.) m.l. - 140.58 140.58 140.58 140.58 140.58 140.58 140.58 140.58 140.58 140.58 140.58 121.28 121.28 121.28 121.28 121.28 121.28 121.28 121.28 121.28 121.28 101.18 32.33 2,892.7
E/C EC58 4n Fe esmalte sintético m² - - - - - - - - - - - - - - - - - - - - - - 111.94 111.9 3,112.7
Otro 2 4n Martelina fachada metros lineales ml 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 220.0
Otro 3 4n Bajada de agua (acrizinc + martelina) m² 27.00 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 - 522.0
1 1
1 1
1 1
1 1
1 4 Departamento Tipo ====> 1 2 3 4 5 6 7 8 9 10 11 12 TOTAL
1 4 Cantidad de deptos del tipo señalado =============> 22 22 21 21 21 22 22 22 22 22 22 11 250 DESCUADRE
m 4 Departamentos (Partidas) Un
DP DP05 4t Cielos exteriores granolátex fino sobre hormigón m² 2.45 2.35 1.88 1.88 1.88 2.35 2.32 - 2.32 2.20 2.20 2.45 501.6 2,241.7
DP DP28 4t Muros Terraza Martelina m² 4.45 6.42 5.26 5.26 5.26 5.95 6.28 - 6.16 5.96 5.96 4.22 1,283.7
DP DP30 4t Pasamanos esmalte anodizado m² 5.45 4.08 4.12 4.12 4.12 4.33 4.33 - 4.33 4.39 4.39 5.81 1,011.7
DP DP32 4t Desagüe Terraza m.l. 2.50 2.47 2.50 2.50 2.50 2.47 2.46 - 2.44 2.50 2.50 2.47 565.4
DP39 4n Gárgola U 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 1.00 1.00 1.00 228.0
DP42 4t Cortagotera (cantería retorno martelina) m.l. 3.11 2.47 2.50 2.50 2.50 2.47 2.44 - 2.44 2.50 2.50 3.32 587.8 1,846.2
DP64 4t Muros Terraza interior martelina STD m.l. 8.95 4.94 4.99 4.99 4.99 5.10 5.10 - 5.10 5.10 5.10 7.04 1,258.4
DP65 4t Muros Terraza exterior martelina STD m² 2.63 1.85 1.87 1.87 1.87 1.85 1.83 - 1.83 1.87 1.87 3.30 456.5

Cubicación realizada con planos versión ==>

Esta cubicación no considera:


1) DEPARTAMENTOS
2) Muros de baño
3) Anticorrosivos
4) Empaste en cielo de terrazas
5) De closet y walking closet no se considera puerta, marco, pilastra, junquillo, endolado
6) Guardapolvos y junquillos
7)
8)
9)
10)
11) ESPACIOS COMUNES
12) Muro trasero tras mueble de recepción en primer piso
13) Anticorrosivos
14) Guardapolvos y junquillos
15) Zócalo de estacionamiento y señalética de muro
16) Señalética de piso (paso de cebra, flechas, etc)
17) Muros húmedos (baños, cocina, enfermería)
18) Cielos quincho Terraza (cubierta) tampoco el cielo de quincho cerrado y techado
19) Cielos salón infantil, salón multiuso y Cowork
20) Puertas vidriadad (puerta, marco, pilastra, endolado)
21) Reja perimetral
22)
23)
24)
25)
26) COMENTARIOS
27) La martelina se aplica a llana lo que podría significar que se generan ciertos dibbujos provocado por el movimiento del cuarzo (rayas)
28) No se considera pintar a pistola (las eett señalaban puertas a pistola y muros de cocina)
29) La martelina considerada para fachada es grano 25 y no 30 como señalan las EETT y no es impermeable ni hidrorrepelente
30) Para números sólo se consideran los de estacionamiento de vehículos
31) Para cieo closet refrigerador se considera losalín y muros empapelados
32) Sólo el departamento tipo 14 considera que el cielo de cocina se termina con esmalte al agua, el resto de las cocinas con losalín
33) Sólo en quincho cerrado de cubierta se consideran los muros con esmalte alñ agua, el resto de muros e quinchosa se considera con martelina G25
34) Sólo se considera textura orgánica en muros de Oficina Taller y en pasillos primer piso
35) En cielos pasillo primer piso se considera láte y no esmalte al agua
36) En torre A no se considra trabajo en caja escala ni vestíbulos ni siquiera en subterráneos
37)
38) BARNICES

TORRE 1
h Cuadratura deptos 1 2 3 4 5 6 7 8 9 10 11 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total
1º 0
2º 1 1 1 1 1 1 1 1 1 1 1 1 12
3º 1 1 1 1 1 1 1 1 1 1 1 1 12
4º 1 1 1 1 1 1 1 1 1 1 1 1 12
5º 1 1 1 1 1 1 1 1 1 1 1 1 12
6º 1 1 1 1 1 1 1 1 1 1 1 1 12
7º 1 1 1 1 1 1 1 1 1 1 1 1 12
8º 1 1 1 1 1 1 1 1 1 1 1 1 12
9º 1 1 1 1 1 1 1 1 1 1 1 1 12
10º 1 1 1 1 1 1 1 1 1 1 1 1 12
11º 1 1 1 1 1 1 1 1 1 1 1 1 12
12º 1 1 1 1 1 1 1 1 1 1 1 1 12
13º 1 1 1 1 1 1 1 1 1 1 1 11
14º 1 1 1 1 1 1 1 1 1 1 1 11
15º 1 1 1 1 1 1 1 1 1 1 1 11
16º 1 1 1 1 1 1 1 1 1 1 1 11
17º 1 1 1 1 1 1 1 1 1 1 1 11
18º 1 1 1 1 1 1 1 1 1 1 1 11
19º 1 1 1 1 1 1 1 1 1 1 1 11
20º 1 1 1 1 1 1 1 1 1 1 1 11
21º 1 1 1 1 1 1 1 1 1 1 1 11
22º 1 1 1 1 1 1 1 1 1 1 1 11
23º 1 1 1 1 1 1 1 1 8
24º 0
25º 0

22 22 21 21 21 22 22 22 22 22 22 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 250

TORRE 2
h Cuadratura deptos 1 2 3 4 5 6 7 8 9 10 11 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total
1º 0
2º 0
3º 0
4º 0
5º 0
6º 0
7º 0
8º 0
9º 0
10º 0
11º 0
12º 0
13º 0
14º 0
15º 0
16º 0
17º 0
18º 0
19º 0
20º 0
21º 0
22º 0
23º 0
24º 0
25º 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TORRE 3
h Cuadratura deptos 1 2 3 4 5 6 7 8 9 10 11 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total
1º 0
2º 0
3º 0
4º 0
5º 0
6º 0
7º 0
8º 0
9º 0
10º 0
11º 0
12º 0
13º 0
14º 0
15º 0
16º 0
17º 0
18º 0
19º 0
20º 0
21º 0
22º 0
23º 0
24º 0
25º 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Resumen
Total TORRE 1 250
Total TORRE 2 0
Total TORRE 3 0

TOTAL 250
Cuadro de cubicación de obra ======> Mapocho 2 (Torre B + 100% subterraneo ambas torres)
Constructora ======> EUROCONSTRUCTORA
Fecha ======>
¿Productos deben cumplir con norma LEED? ==> No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 31 32
Ancho losa ====>
Terraza y
Tipo Piso ====> -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 cubierta
Cantidad de Pisos =============> 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 TOTAL
Zona M Obs Fam Espacios Comunes (partidas) Un
E/C EC49 1n Martelina fachada STD m² 1,082 228.05 228.05 228.05 228.05 228.05 228.05 228.05 228.05 228.05 228.05 228.05 262.81 216.55 216.55 216.55 216.55 216.55 216.55 216.55 216.55 216.55 224.95 572.21 6,599.4
E/C EC50 1n Martelina rasgos fachada (m.l.) m.l. - 136.53 136.53 136.53 136.53 136.53 136.53 136.53 136.53 136.53 136.53 136.53 117.23 117.23 117.23 117.23 117.23 117.23 117.23 117.23 117.23 117.23 102.04 32.33 2,808.5
E/C EC58 1n Fe esmalte sintético m² 87.81 19.63 65.60 - - - - - - - - - - - - - - - - - - - - - 111.94 285.0
EC86 1n Cantería de fachada m.l. 91.22 91.22 91.22 91.22 91.22 91.22 91.22 91.22 91.22 91.22 91.22 91.22 91.22 91.22 91.22 91.22 91.22 91.22 91.22 91.22 91.22 91.22 2,006.9
Otro 2 1n Martelina fachada metros lineales m² 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 220.0
Otro 3 1n Bajada de agua (acrizinc + martelina) m² 27.00 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 - 522.0
Otro 10 1n Martelina exterior Hall Acceso común ambas torres primer piso m² 224.79 - - - - - - - - - - - - - - - - - - - - - 224.8
Otro 15 1n Reja Perimetral m² 591.80 - - - - - - - - - - - - - - - - - - - - - 591.8
1 1
1 1
1 1
1 1 7,346
1 1 Departamento Tipo ====> 13 14 15 16 17 18 19 20 21 22 23 3,029 TOTAL
1 1 Cantidad de deptos del tipo señalado =============> 22 22 21 21 22 22 22 22 22 22 11 229 DESCUADRE
m 1 Departamentos (Partidas) Un
DP DP05 1t Cielos exteriores granolátex fino sobre hormigón m² 2.40 2.37 2.37 1.88 2.35 2.32 - 2.32 2.20 2.20 2.45 3,185 471.7
DP DP28 1t Muros Terraza Martelina m² 5.45 6.20 6.20 5.02 5.95 6.28 - 6.16 5.96 5.96 4.22 1,205.4
DP DP30 1t Pasamanos esmalte anodizado m² 4.93 4.93 4.39 4.39 4.33 4.33 - 4.33 4.39 4.39 5.81 529 943.9
DP DP32 1t Desagüe Terraza m.l. 2.50 2.50 2.50 2.50 2.47 2.46 - 2.44 2.50 2.50 2.47 513.6
DP39 1n Gárgola U 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 1.00 1.00 1.00 207.0
DP42 1t Cortagotera (cantería retorno martelina) m.l. 2.79 2.50 2.50 2.50 2.47 2.44 - 2.44 2.50 2.50 3.32 529.0
DP64 1t Muros Terraza interior martelina STD m.l. 5.97 5.10 5.10 5.10 5.10 5.10 - 5.10 5.10 5.10 7.04 1,096.2
DP65 1t Muros Terraza exterior martelina STD m² 2.39 1.87 1.87 1.87 1.85 1.83 - 1.83 1.87 1.87 3.30 412.2

Cubicación realizada con planos versión ==>

Esta cubicación no considera:


1) DEPARTAMENTOS
2) Muros de baño
3) Anticorrosivos
4) Empaste en cielo de terrazas
5) De closet y walking closet no se considera puerta, marco, pilastra, junquillo, endolado
6) Guardapolvos y junquillos
7)
8)
9)
10)
11) ESPACIOS COMUNES
12) Muro trasero tras mueble de recepción en primer piso
13) Anticorrosivos
14) Guardapolvos y junquillos
15) Zócalo de estacionamiento y señalética de muro
16) Señalética de piso (paso de cebra, flechas, etc)
17) Muros húmedos (baños, cocina, enfermería)
18) Cielos quincho Terraza (cubierta) tampoco el cielo de quincho cerrado y techado
19) Cielos salón infantil, salón multiuso y Cowork
20) Puertas vidriadad (puerta, marco, pilastra, endolado)
21) Ferretería enb trerraza quincho cerrado (termopintado)
22) Puerta acceso hall edificios
23) Superficies galvanizadas
24)
25)
26) COMENTARIOS
27) La martelina se aplica a llana lo que podría significar que se generan ciertos dibbujos provocado por el movimiento del cuarzo (rayas)
28) No se considera pintar a pistola (las eett señalaban puertas a pistola y muros de cocina)
29) La martelina considerada para fachada es grano 25 y no 30 como señalan las EETT y no es impermeable ni hidrorrepelente
30) Para números sólo se consideran los de estacionamiento de vehículos
31) Para cieo closet refrigerador se considera losalín y muros empapelados
32) Sólo el departamento tipo 14 considera que el cielo de cocina se termina con esmalte al agua, el resto de las cocinas con losalín
33) Sólo en quincho cerrado de cubierta se consideran los muros con esmalte alñ agua, el resto de muros e quinchosa se considera con martelina G25
34) Sólo se considera textura orgánica en muros de Oficina Taller y en pasillos primer piso
35) En cielos pasillo primer piso se considera láte y no esmalte al agua
36) En torre A no se considra trabajo en caja escala ni vestíbulos ni siquiera en subterráneos
37)
38)

TORRE 1
h Cuadratura deptos 13 14 15 16 17 18 19 20 21 22 23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total
1º 0
2º 1 1 1 1 1 1 1 1 1 1 1 11
3º 1 1 1 1 1 1 1 1 1 1 1 11
4º 1 1 1 1 1 1 1 1 1 1 1 11
5º 1 1 1 1 1 1 1 1 1 1 1 11
6º 1 1 1 1 1 1 1 1 1 1 1 11
7º 1 1 1 1 1 1 1 1 1 1 1 11
8º 1 1 1 1 1 1 1 1 1 1 1 11
9º 1 1 1 1 1 1 1 1 1 1 1 11
10º 1 1 1 1 1 1 1 1 1 1 1 11
11º 1 1 1 1 1 1 1 1 1 1 1 11
12º 1 1 1 1 1 1 1 1 1 1 1 11
13º 1 1 1 1 1 1 1 1 1 1 10
14º 1 1 1 1 1 1 1 1 1 1 10
15º 1 1 1 1 1 1 1 1 1 1 10
16º 1 1 1 1 1 1 1 1 1 1 10
17º 1 1 1 1 1 1 1 1 1 1 10
18º 1 1 1 1 1 1 1 1 1 1 10
19º 1 1 1 1 1 1 1 1 1 1 10
20º 1 1 1 1 1 1 1 1 1 1 10
21º 1 1 1 1 1 1 1 1 1 1 10
22º 1 1 1 1 1 1 1 1 1 1 10
23º 1 1 1 1 1 1 1 1 8
24º 0
25º 0

22 22 21 21 22 22 22 22 22 22 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 229

TORRE 2
h Cuadratura deptos 13 14 15 16 17 18 19 20 21 22 23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total
1º 0
2º 0
3º 0
4º 0
5º 0
6º 0
7º 0
8º 0
9º 0
10º 0
11º 0
12º 0
13º 0
14º 0
15º 0
16º 0
17º 0
18º 0
19º 0
20º 0
21º 0
22º 0
23º 0
24º 0
25º 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TORRE 3
h Cuadratura deptos 13 14 15 16 17 18 19 20 21 22 23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total
1º 0
2º 0
3º 0
4º 0
5º 0
6º 0
7º 0
8º 0
9º 0
10º 0
11º 0
12º 0
13º 0
14º 0
15º 0
16º 0
17º 0
18º 0
19º 0
20º 0
21º 0
22º 0
23º 0
24º 0
25º 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Resumen
Total TORRE 1 229
Total TORRE 2 0
Total TORRE 3 0

TOTAL 229
128.2
Zona Cielo Muros Cielo
Bodega E al A E al A Semibrillo 6.9
Casillas E al A E al A Semibrillo 16.7
Of. Taller E al A Textura Orgánica 21.7
Lavandería E al A Cerámica 25.2
Salón Infantil Hormigón Visto E al A Semibrillo 0.0
Sala Multiuso Hormigón Visto E al A Semibrillo 0.0
Cowork E al A Porcelanato + E al A Semibrillo 31.1
Conserjería E al A Óleo Semibrillo 13.9
Camarín E al A Cerámica 12.7

Muros E al A SB 227.0
Muros Óleo 36.2
Muros Textura Orgánica 43.9
Cielos Esmalte al agua 128.2
Cornisa 195.8
307.0 195.8
Muros Cs
24.8 10.8
39.6 17.9
43.9 20.8
0.0 20.3
54.3 25.6
80.6 37.8
27.8 23.6
36.2 16.1
0.0 23.0

También podría gustarte