CONTROL DE VALORIZACIONES:
PROGRAMADO VS. EJECUTADO
17,826.45
700,000.00
636,052.03
618,225.58
600,000.00
577,038.81
565,781.04 17,826.45
500,000.00
450,008.78
436,682.09
400,000.00
300,000.00 293,763.41
PROGRAMADO EJECUTADO
200,000.00 217,867.38
131,770.49
100,000.00 89,582.33
- -
8/8/2017
8/31/2017
9/30/2017
10/31/2017
11/30/2017
12/16/2017
-
100,000.00
200,000.00
8/8/2017
-
8/31/2017
89,582.33
131,770.49
9/30/2017
10/31/2017
11/30/2017
12/16/2017
DEDUCTIVO (SALDO A DEVOLVER)
OBRA: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE
SUCCHIRCA"
CONVENIO: 1455-2016/VIVIENDA/VMCS/PNSU-NE
OBRA: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE
SUCCHIRCA"
CONVENIO: 1455-2016/VIVIENDA/VMCS/PNSU-NE
OBRA: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE
SUCCHIRCA"
CONVENIO: 1455-2016/VIVIENDA/VMCS/PNSU-NE
OBRA: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE
SUCCHIRCA"
CONVENIO: 1455-2016/VIVIENDA/VMCS/PNSU-NE
OBRA: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE
SUCCHIRCA"
CONVENIO: 1455-2016/VIVIENDA/VMCS/PNSU-NE
OBRA: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE
SUCCHIRCA"
CONVENIO: 1455-2016/VIVIENDA/VMCS/PNSU-NE
OBRA: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE
SUCCHIRCA"
CONVENIO: 1455-2016/VIVIENDA/VMCS/PNSU-NE
COSTO DIRECTO TOTAL DEL PROYECTO 635,558.03 577,038.81 90.79% 41,186.77 6.48% 618,225.58 97.30% 17,826.45 2.80%
POR EL NÚCLEO EJECUTOR (Mínimo dos de ellos)
__________________________________
__________________________________ FISCAL DEL NE
PRESIDENTE DEL NE Nombre: REMIGIO QUISPE QUISPE
Nombre: JOSE AGUSTO PADILLA PADILLA ________________________ DNI N° : 03232304
DNI N° : 03220857 TESORERO DEL NE
Nombre: VALERIA HUAMAN TOCTO
DNI N°: 47724693
DEDUCTIVO (SALDO A DEVOLVER)
OBRA: "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE
SUCCHIRCA"
CONVENIO:__________________________________
1455-2016/VIVIENDA/VMCS/PNSU-NE __________________________________
FISCAL DEL NE
PRESIDENTE DEL NE Nombre: REMIGIO QUISPE QUISPE
Nombre: JOSE AGUSTO PADILLA PADILLA PRESUPUESTO ________________________ AVANCES SALDO POR EJECTUTAR
DNI N° : 03232304
PARTIDA DNI N° : 03220857
DESCRIPCIÓN TESORERO DEL NE
ANTERIOR ACTUAL ACUMULADO
Unid Metrado P. Unit. Nombre:Metrado
Presup. VALERIA HUAMAN TOCTO
Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
DNI N°: 47724693
________________________
SECRETARIO DEL NE
Nombre: PORFILIANO CHAPA HUAMAN
DNI N°: 03221082
RESIDENTE DE PROYECTO SUPERVISOR DE PROYECTOS
SERGIO ARMANDO SAONA HUAMAN JOSE ELMER BANCES SANTAMARIA
D.N. I. N° 03243337 D.N. I. N° 43489408
FORMATO N° 09
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
CONVENIO 1455-2016/VIVIENDA/VMCS/PNSU-NE
FECHA 10/01/2018
OBRA "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE SUCCHIRCA"
COSTO DIRECTO S/. 635,558.03
ÍTEM PARTIDAS UND METR. COSTO COSTO PARC. PERIODO COSTO DIRECTO
UNIT. AGOSTO 2017 SETIEMBRE 2017 OCTUBRE 2017 NOVIEMBRE 2017 DICIEMBRE
1S 2S 3S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S
CONVENIO 1455-2016/VIVIENDA/VMCS/PNSU-NE
FECHA 10/01/2018
OBRA "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE SUCCHIRCA"
COSTO DIRECTO S/. 635,558.03
ÍTEM PARTIDAS UND METR. COSTO COSTO PARC. PERIODO COSTO DIRECTO
UNIT. AGOSTO 2017 SETIEMBRE 2017 OCTUBRE 2017 NOVIEMBRE 2017 DICIEMBRE
1S 2S 3S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S
P - S/. 21.32 21.32
E - 21.32
02.01.01.06.02 UNION PVC SP DIAM. 1 1/2" und 1.00 16.57 S 16.57 -
P - S/. 16.57 16.57
E - 16.57
02.01.01.06.03 UNION PVC SP DIAM. 2" und 2.00 31.25 S 62.50 -
P - S/. 62.50 62.50
E - 62.50
02.01.01.06.04 ADAPTADOR PR PVC DIAM. 1 1/2" und 2.00 13.17 S 26.34 -
P - S/. 26.34 26.34
E - 26.24
02.01.01.06.05 VALVULA COMPUERTA DE BRONCE DE 1 1/2" und 1.00 80.17 S 80.17 -
P - S/. 80.17 80.17
E - 80.17
02.01.01.06.06 CONO DE REBOSE PVC SP 4" und 1.00 30.32 S 30.32 -
P - S/. 30.32 30.32
E - 30.32
02.01.01.06.07 CODO PVC C-10 DIAM 2"x90° und 5.00 26.22 S 131.10 -
P - S/. 131.10 131.10
FORMATO N° 09
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
CONVENIO 1455-2016/VIVIENDA/VMCS/PNSU-NE
FECHA 10/01/2018
OBRA "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE SUCCHIRCA"
COSTO DIRECTO S/. 635,558.03
ÍTEM PARTIDAS UND METR. COSTO COSTO PARC. PERIODO COSTO DIRECTO
UNIT. AGOSTO 2017 SETIEMBRE 2017 OCTUBRE 2017 NOVIEMBRE 2017 DICIEMBRE
1S 2S 3S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S
E - 131.10
02.01.01.06.08 UNION UNIVERSAL PVC DIAM.= 1 1/ 2" und 2.00 17.04 S 34.08 -
P - S/. 34.08 34.08
E - 34.08
02.01.01.06.09 TEE PVC C-10 DIAM. 2" und 2.00 28.32 S 56.64 -
P - S/. 56.64 56.64
E - 56.64
02.01.01.06.10 TAPON PVC C 10 DIAM 2" und 2.00 28.32 S 56.64 -
P - S/. 56.64 56.64
E - 56.64
02.01.01.06.11 SUMINISTRO E INSTALACION DE TUB. PVC DESAG m 3.00 7.73 S 23.19 -
P - S/. 23.19 23.19
E - 23.19
02.01.01.06.12 SUMINISTRO Y E INSTALACION DE TUB. PVC DIAM. m 2.00 7.86 S 15.72 -
P - S/. 13.76 1.96 15.72
E - 15.72
02.01.01.07 VARIOS - -
02.01.01.07.01 TAPA SANITARIA METALICA DE 1/8" DE 0.60x0.6 und 2.00 183.09 S 366.18 -
P - S/. 366.18 366.18
E - 366.18
02.01.01.08 CERCO DE PROTECCION EN CAPTACION - -
02.01.01.08.01 CERCO PERIMETRICO CON ALAMBRE DE PUAS X 6 m 21.20 5.72 S 121.26 -
P - S/. 121.26 121.26
E - 121.26
02.01.01.08.02 POSTE DE MADERA TORNILLO 3" x 3" x 1.95M und 9.00 48.55 S 436.95 -
P - S/. 436.95 436.95
E - 436.95
02.01.01.01.03 POSTE DE MADERA CON ALAMBRE DE PUAS 0.80x und 1.00 87.87 S 87.87 -
P - S/. 87.87 87.87
E - 87.87
02.02 LINEA DE CONDUCCION - -
02.02.01 TRABAJOS PRELIMINARES - -
02.02.01.01 TRAZO, NIVELACION Y REPLANTEO DE OBRAS LINEA m 1,150.00 0.47 S 540.50 -
P - S/. 540.50 540.50
E - S/. 540.50
02.02.01.02 DESBROCE Y LIMPIEZA DE TERRENO m 1,150.00 4.47 S 5,140.50 -
P - S/. 3,000.00 S/. 2,140.50 5,140.50
E - 5,140.50
02.02.02 MOVIMIENTO DE TIERRAS - -
02.02.02.01 EXCAVACION MANUAL DE ZANJAS EN TERRENO NOR m 1,150.00 9.57 S 11,005.50 -
P - S/. 3,301.65 S/. 5,502.75 S/. 2,201.10 11,005.50
E - 11,005.50
02.02.02.02 EXCAVACION MANUAL EN TERRENO SEMI - ROCOSO m3 9.43 114.89 S 1,083.41 -
P - S/. 758.39 325.02 1,083.41
E - 1,083.41
02.02.02.03 REFINE Y NIVELACION DE ZANJA PARA TUBERIAS m2 517.09 1.34 S 692.90 -
P - S/. 415.74 S/. 277.16 692.90
E - 692.90
02.02.03 OBRAS DE CONCRETO SIMPLE - -
02.02.03.01 CONCRETO CH 1:8 EN SOLADO, e=2" m2 2.77 14.00 S 38.78 -
P - S/. 38.78 38.78
E - 38.78
02.02.03.02 ENCOFRADO Y DESENCOFRADO m2 12.00 36.11 S 433.32 -
P - S/. 433.32 433.32
E - 433.32
02.02.03.03 CONCRETO f'c=140 kg/cm2 FABRICADO A MANO, E m3 1.60 350.06 S 560.10 -
P - S/. 560.10 560.10
E - 560.10
02.02.04 TUBERIAS Y ACCESORIOS - -
02.02.04.01 SUMINISTRO E INSTALACION DE TUB. HDP 32mmx10 m 1,150.00 4.97 S 5,715.50 -
P - 5,715.50 5,715.50
E - 5,715.50
02.02.04.02 PRUEBAS HIDRAULICA Y DESINFECCION EN REDES D m 1,150.00 0.88 S 1,012.00 -
P - 1,012.00 1,012.00
E - 1,012.00
02.02.05 PASES AEREOS - -
02.02.05.01 MOVIMIENTO DE TIERRAS - -
02.02.05.01.01 EXCAVACION MANUAL EN TERRENO SEMI-ROCOSO m3 5.86 114.89 S 673.26 -
P - S/. 550.00 S/. 123.26 673.26
E - 673.26
FORMATO N° 09
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
CONVENIO 1455-2016/VIVIENDA/VMCS/PNSU-NE
FECHA 10/01/2018
OBRA "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE SUCCHIRCA"
COSTO DIRECTO S/. 635,558.03
ÍTEM PARTIDAS UND METR. COSTO COSTO PARC. PERIODO COSTO DIRECTO
UNIT. AGOSTO 2017 SETIEMBRE 2017 OCTUBRE 2017 NOVIEMBRE 2017 DICIEMBRE
1S 2S 3S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S
02.02.05.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 0.94 31.66 S 29.76 -
P - S/. 29.76 29.76
E - 29.76
02.02.05.01.03 REFINE Y NIVELACION EN TERRENO NORMAL m2 4.88 1.68 S 8.20 -
P - S/. 8.20 8.20
E - 8.20
02.02.05.02 OBRAS DE CONCRETO SIMPLE - -
02.02.05.02.01 CONCRETO f'c=175 kg/cm2 m3 4.88 459.87 S 2,244.17 -
P - S/. 2,244.17 2,244.17
E - 2,244.17
02.02.05.02.02 CONCRETO CH 1:8 EN SOLADO, e=2" m2 2.00 14.00 S 28.00 -
P - S/. 28.00 28.00
E - 28.00
02.02.05.03 CONCRETO ARMADO - -
02.02.05.03.01 CONCRETO f'c=210 kg/cm2, PARA ZAPATAS FAB m3 2.88 512.06 S 1,474.73 -
P - S/. 1,474.73 1,474.73
E - 1,474.73
02.02.05.03.02 CONCRETO f'c=210 kg/cm2, PARA COLUMNAS F m3 0.49 512.06 S 250.91 -
P - S/. 250.91 250.91
FORMATO N° 09
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
CONVENIO 1455-2016/VIVIENDA/VMCS/PNSU-NE
FECHA 10/01/2018
OBRA "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE SUCCHIRCA"
COSTO DIRECTO S/. 635,558.03
ÍTEM PARTIDAS UND METR. COSTO COSTO PARC. PERIODO COSTO DIRECTO
UNIT. AGOSTO 2017 SETIEMBRE 2017 OCTUBRE 2017 NOVIEMBRE 2017 DICIEMBRE
1S 2S 3S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S
E - 250.91
02.02.05.03.03 ENCOFRADO Y DESENCOFRADO m2 6.48 36.11 S 233.99 -
P - S/. 85.00 S/. 148.99 233.99
E - 233.99
02.02.05.03.04 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 103.68 4.38 S 454.12 -
P - S/. 154.12 S/. 300.00 454.12
E - 454.12
02.02.05.03.05 TARRAJEO EN EXTERIORES (MORTERO 1:3,e=1.5 m2 6.48 17.74 S 114.96 -
P - S/. 114.96 114.96
E - 114.96
02.02.05.04 CABLES Y ACCESORIOS - -
02.02.05.04.01 SUMINISTRO E INSTALACIÓN DE CABLE DE ACERO m 45.00 16.88 S 759.60 -
P - S/. 759.60 759.60
E - 759.60
02.02.05.04.02 SUMINISTRO E INSTALACIÓN DE ABRAZADERAS und 15.00 18.15 S 272.25 -
P - S/. 272.25 272.25
E - 272.25
02.02.05.04.03 SUMINISTRO E INSTALACIÓN DE PENDOLAS und 15.00 65.17 S 977.55 -
P - S/. 977.55 977.55
E - 977.55
02.02.05.04.04 SUMINISTRO E INSTALACIÓN DE TEMPLADORES und 15.00 16.30 S 244.50 -
P - S/. 244.50 244.50
E - 244.50
02.02.05.04.05 SUMINISTRO E INSTALACIÓN DE ELEMENTOS EM und 2.00 44.36 S 88.72 -
P - S/. 88.72 88.72
E - 88.72
02.02.06 CAMARA ROMPE PRESION TIPO 6 (06 UND) - -
02.02.06.01 LIMPIEZA DEL TERRENO MANUAL m2 18.00 1.07 S 19.26 -
P - S/. 19.26 19.26
E - 19.26
02.02.06.02 TRAZO Y REPLANTEO PRELIMINAR m2 18.00 1.00 S 18.00 -
P - S/. 18.00 18.00
E - 18.00
02.02.06.03 EXCAVACION MANUAL EN TERRENO NORMAL m3 14.40 16.75 S 241.20 -
P - S/. 241.20 241.20
E - 241.20
02.02.06.04 ACARREO DE MATERIAL EXCEDENTE HASTA D PROM m3 17.28 13.40 S 231.55 -
P - S/. 231.55 231.55
E - 231.55
02.02.06.05 CONCRETO C.H 1:8 EN SOLADO E=2" m3 12.72 14.00 S 178.08 -
P - S/. 178.08 178.08
E - 178.08
02.02.06.06 ENCOFRADO Y DESENCOFRADO m2 43.20 36.11 S 1,559.95 -
P - S/. 1,559.95 1,559.95
E - 1,559.95
02.02.06.07 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 241.92 4.38 S 1,059.61 -
P - S/. 1,059.61 1,059.61
E - 1,059.61
02.02.06.08 CONCRETO f'c=210 kg/cm2 FABRICADO A MANO m3 3.24 505.25 S 1,637.01 -
P - S/. 1,637.01 1,637.01
E - 1,637.01
02.02.06.09 TARRAJEO EN INTERIORES CON IMPERMEABILIZANT m2 31.20 34.07 S 1,062.98 -
P - S/. 1,062.98 1,062.98
E - 1,062.98
02.02.06.10 TARRAJEO EN EXTERIORES (MORTERO 1:3,e=1.50c m2 26.16 17.74 S 464.08 -
P - S/. 464.08 464.08
E - 464.08
02.02.06.11 PINTURA ESMALTE m2 26.16 8.45 S 221.05 -
P - S/. 221.05 221.05
E - 221.05
02.02.06.12 TAPA SANITARIA METALICA DE 1/8" DE 0.60m x 0.6 und 6.00 183.09 S 1,098.54 -
P - S/. 1,098.54 1,098.54
E - 1,098.54
02.02.06.13 EQUIPAMIENTO PARA CAMARA ROMPE PRESION TIPOglb 6.00 280.73 S 1,684.38 -
P - S/. 1,684.38 1,684.38
E - 1,684.38
02.02.06.14 REBOSE DE CAMARA ROMPE PRESION TIPO VI glb 6.00 144.50 S 867.00 -
P - S/. 867.00 867.00
E - 867.00
02.03 RESERVORIO - -
FORMATO N° 09
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
CONVENIO 1455-2016/VIVIENDA/VMCS/PNSU-NE
FECHA 10/01/2018
OBRA "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE SUCCHIRCA"
COSTO DIRECTO S/. 635,558.03
ÍTEM PARTIDAS UND METR. COSTO COSTO PARC. PERIODO COSTO DIRECTO
UNIT. AGOSTO 2017 SETIEMBRE 2017 OCTUBRE 2017 NOVIEMBRE 2017 DICIEMBRE
1S 2S 3S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S
02.03.01 RESERVORIO DE 5.00 m3 - -
02.03.01.01 LIMPIEZA DEL TERRENO MANUAL m2 29.33 1.07 S 31.38 -
P - S/. 31.38 31.38
E - 31.38
02.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 29.33 1.00 S 29.33 -
P - S/. 29.33 29.33
E - 29.33
02.03.01.03 EXCAVACION MANUAL EN TERRENO NORMAL m3 12.31 16.75 S 206.19 -
P - S/. 206.19 206.19
E - 206.19
02.03.01.04 REFINE Y NIVELACION EN TERRENO NORMAL m2 29.33 1.68 S 49.27 -
P - 49.27 49.27
E - 49.27
02.03.01.05 RELLENO COMPACTADO CON MATERIAL PROPIO m3 0.66 31.66 S 20.90 -
P - 20.90 20.90
E - 20.90
02.03.01.06 ACARREO DE MATERIAL EXCEDENTE HASTA D PROM m3 14.77 13.40 S 197.92 -
P - S/. 197.92 197.92
E - 197.92
02.03.01.07 CONCRETO C.H 1:8 EN SOLADO E=2" m3 6.16 14.00 S 86.24 -
P - S/. 86.24 86.24
E - 86.24
02.03.01.08 VEREDA DE CONCRETO f'c=140 kg/cm2 m3 7.96 351.49 S 2,797.86 -
P - S/. 2,797.86 2,797.86
E - 2,797.86
02.03.01.09 CUNETA REVESTIDA DE CONCRETO f'c=140 kg/cm2 m 15.40 29.27 S 450.76 -
P - S/. 450.76 450.76
E - 450.76
02.03.01.10 ENCOFRADO Y DESENCOFRADO m2 35.22 36.11 S 1,271.79 -
P - S/. 850.00 S/. 421.79 1,271.79
E - 850.00 421.79
02.03.01.11 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 547.99 4.38 S 2,400.20 -
P - S/. 2,400.20 2,400.20
E - 2,400.00
02.03.01.12 CONCRETO f'c=210 kg/cm2 FABRICADO A MANO m3 9.14 505.25 S 4,617.99 -
P - S/. 4,617.99 4,617.99
E - 4,617.99
02.03.01.13 TARRAJEO EN INTERIORES CON IMPERMEABILIZANT m2 15.30 34.07 S 521.27 -
P - S/. 521.27 521.27
E - 521.27
02.03.01.14 TARRAJEO EN EXTERIORES (MORTERO 1:3,e=1.50c m2 14.10 17.74 S 250.13 -
P - S/. 250.13 250.13
E - 250.13
02.03.01.15 PINTURA ESMALTE m2 14.10 8.45 S 119.15 -
P - S/. 104.26 S/. 14.89 119.15
E - 119.15
02.03.02 CUARTO DE VALVULAS - -
02.03.02.01 EXCAVACION MANUAL EN TERRENO SEMI-ROCOSO m3 3.55 114.89 S 407.86 -
P - S/. 388.81 S/. 19.05 407.86
E - 407.86
02.03.02.02 ACARREO DE MATERIAL EXCEDENTE HASTA D PRO m3 4.20 13.40 S 56.28 -
P - S/. 24.97 S/. 31.31 56.28
E - 56.28
02.03.02.03 ENCOFRADO Y DESENCOFRADO m2 20.53 36.11 S 741.34 -
P - S/. 741.34 741.34
E - 741.34
02.03.02.04 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 222.21 4.38 S 973.28 -
P - S/. 300.00 S/. 673.28 973.28
E - 973.28
02.03.02.05 CONCRETO FC=210 Kg/cm2 FABRICADO A MANO m3 2.34 512.06 S 1,198.22 -
P - S/. 1,198.22 1,198.22
E - 1,198.22
02.03.02.06 TARRAJEO EN INTERIORES CON IMPERMEABILIZANT m2 15.30 34.07 S 521.27 -
P - S/. 521.27 521.27
E - 521.27
02.03.02.07 TARRAJEO EN EXTERIORES (MORTERO 1:3,e=1.50c m2 14.10 17.74 S 250.13 -
P - S/. 250.13 250.13
E - 250.13
02.03.03 EQUIPAMIENTO - -
02.03.03.01 EQUIPAMIENTO PARA RESERVORIO DE 5.00 m3 glb 1.00 949.51 S 949.51 -
FORMATO N° 09
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
CONVENIO 1455-2016/VIVIENDA/VMCS/PNSU-NE
FECHA 10/01/2018
OBRA "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE SUCCHIRCA"
COSTO DIRECTO S/. 635,558.03
ÍTEM PARTIDAS UND METR. COSTO COSTO PARC. PERIODO COSTO DIRECTO
UNIT. AGOSTO 2017 SETIEMBRE 2017 OCTUBRE 2017 NOVIEMBRE 2017 DICIEMBRE
1S 2S 3S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S
P - S/. 400.00 S/. 549.51 949.51
E - 949.51
02.03.03.02 ESCALERA MARINERA F°G" 2" Y 3/4" m 5.50 140.54 S 772.97 -
P - S/. 300.00 S/. 472.97 772.97
E - 772.97
02.03.03.03 ESCALERA TIPO GATO F°G" 5/8" und 3.00 76.11 S 228.33 -
P - S/. 228.33 228.33
E - 228.33
02.03.03.04 TAPA SANITARIA METALICA DE 1/8" DE 0.60m x 0.6 und 1.00 183.09 S 183.09 -
P - S/. 183.09 183.09
E - 183.09
02.03.03.05 TAPA SANITARIA METALICA DE 1/4" D= 0.60m und 1.00 270.90 S 270.90 -
P - S/. 270.90 270.90
E - 270.90
02.03.03.06 TUBERIA DE F°G° DE 1 1/2" m 38.00 16.13 S 612.94 -
P - S/. 612.94 612.94
E - 612.94
02.03.03.07 MALLA METALICA CON ALAMBRE N°12 COCADAS DE 2m2 25.20 49.65 S 1,251.18 -
P - S/. 1,251.18 1,251.18
E - 1,251.18
02.03.03.08 PUERTA METALICA TUBOS DE F°G° Y MALLA (0.80 x und 1.00 266.49 S 266.49 -
P - S/. 266.49 266.49
E - 266.49
02.03.03.09 TANQUE DE HIPOCLORITO DE 50 lt und 1.00 738.76 S 738.76 -
P - S/. 738.76 738.76
E - 738.76
02.03.04 CERCO PERIMETRICO - -
02.03.04.01 CERCO PERIMETRICO CON ALAMBRE DE PUAS X 6 HI m 35.20 5.72 S 201.34 -
P - S/. 201.34 201.34
E - 201.34
02.03.04.02 POSTE DE MADERA TORNILLO 3" x 3" x 1.95M und 14.00 48.55 S 679.70 -
P - S/. 679.70 679.70
E - 679.70
02.03.04.03 PUERTA DE MADERA CON ALAMBRE DE PUAS 0.80 x und 1.00 273.18 S 273.18 -
P - S/. 273.18 273.18
E - 273.18
02.04 LINEA DE ADUCCION Y DISTRIBUCION - -
02.04.01 TRABAJOS PRELIMINARES - -
02.04.01.01 TRAZO, NIVELACION Y REPLANTEO DE OBRAS LINEA m 2,859.35 0.47 S 1,343.89 -
P - S/. 803.45 540.44 1,343.89
E - 1,343.89
02.04.02 MOVIMIENTO DE TIERRAS - -
02.04.02.01 EXCAVACION MANUAL DE ZANJAS EN TERRENO NOR m 2,859.35 6.70 S 19,157.65 -
P - S/. 3,831.53 S/. 5,747.30 S/. 5,747.30 S/. 3,831.53 19,157.65
E - 15,326.12 3,831.53
02.04.02.02 REFINE Y NIVELACION DE ZANJA PARA TUBERIAS m 2,859.35 1.34 S 3,831.53 -
P - S/. 1,149.46 S/. 1,149.46 S/. 1,149.46 S/. 383.15 3,831.53
E - 2,298.92 1,532.61
02.04.02.03 CAMA DE APOYO PARA TUBERIA EN ZANJA DE 0.50M.m 2,859.35 6.29 S 17,985.31 -
P - S/. 5,395.59 S/. 5,395.59 S/. 5,395.59 S/. 1,798.53 17,985.31
E - 13,577.03 818.45 3,589.03
02.04.02.04 RELLENO COMPACTADO DE ZANJAS CON MATERIAL m 2,859.35 14.29 S 40,860.11 -
P - S/. 4,086.01 S/. 9,193.52 S/. 9,193.52 S/. 9,193.52 S/. 9,193.52 40,860.11
E - 30,845.11 1,859.41 8,155.59
02.04.02.05 ACARREO DE MATERIAL EXCEDENTE HASTA D PRO m3 85.63 13.40 S 1,147.44 -
P - S/. 344.23 S/. 344.23 S/. 344.23 114.74 1,147.44
E - 866.04 52.26 229.14
02.04.03 TUBERIAS Y ACCESORIOS - -
02.04.03.01 SUMINISTRO E INSTALACION DE TUB. PVC @1" C-10 m 869.81 3.66 S 3,183.50 -
P - S/. 3,183.50 3,183.50
E - 1,094.74 2,088.76
02.04.03.02 SUMINISTRO E INSTALACION DE TUB. PVC @3/4" C-1m 1,989.54 3.04 S 6,048.20 -
P - S/. 1,814.46 S/. 4,233.74 6,048.20
E - 5,652.64 395.56
02.04.03.03 TUBERIA DE F°G° DE 3/4" m 45.00 12.36 S 556.20 -
P - 556.20 556.20
E - 556.20
02.04.03.04 CODO PVC C-10 @1" x 90° und 5.00 1.00 S 5.00 -
P - S/. 5.00 5.00
E - 5.00
FORMATO N° 09
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
CONVENIO 1455-2016/VIVIENDA/VMCS/PNSU-NE
FECHA 10/01/2018
OBRA "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE SUCCHIRCA"
COSTO DIRECTO S/. 635,558.03
ÍTEM PARTIDAS UND METR. COSTO COSTO PARC. PERIODO COSTO DIRECTO
UNIT. AGOSTO 2017 SETIEMBRE 2017 OCTUBRE 2017 NOVIEMBRE 2017 DICIEMBRE
1S 2S 3S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S
02.04.03.05 CODO PVC C-10 @1" x 45° und 11.00 1.00 S 11.00 -
P - S/. 11.00 11.00
E - 11.00
02.04.03.06 CODO PVC C-10 @1" x 22.5° und 17.00 1.00 S 17.00 -
P - S/. 17.00 17.00
E - 17.00
02.04.03.07 CODO PVC C-10 @3/4" X 90° und 1.00 1.80 S 1.80 -
P - S/. 1.80 1.80
E 1.80
02.04.03.08 CODO PVC C-10 @3/4" X 45° und 9.00 1.80 S 16.20 -
P - S/. 16.20 16.20
E - 16.20
02.04.03.09 CODO PVC C-10 @3/4" X 22.5° und 47.00 2.00 S 94.00 -
P - 94.00 94.00
E - 94.00
02.04.03.10 TEE PVC C-10 @1" x 3/4" und 1.00 4.00 S 4.00 -
P - S/. 4.00 4.00
E - 4.00
02.04.03.11 TEE PVC C-10 @3/4" und 5.00 4.00 S 20.00 -
P - S/. 20.00 20.00
E - 20.00
02.04.03.12 INSTALACION DE ACCESORIOS SANITARIOS 1/2" A 1. und 97.00 8.17 S 792.49 -
P - S/. 792.49 792.49
E - 792.49
02.04.03.13 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE m 2,859.35 0.88 S 2,516.23 -
P - S/. 2,516.23 2,516.23
E - 2,516.23
02.04.04 CAMARA ROMPE PRESION TIPO 7 (13 UND) - -
02.04.04.01 LIMPIEZA DEL TERRENO MANUAL m2 28.73 1.07 S 30.74 -
P - S/. 30.74 30.74
E - S/. 30.74
02.04.04.02 TRAZO Y REPLANTEO PRELIMINAR m2 28.73 1.00 S 28.73 -
P - S/. 28.73 28.73
E - S/. 28.73
02.04.04.03 EXCAVACION MANUAL EN TERRENO NORMAL m3 31.20 16.75 S 522.60 -
P - S/. 522.60 522.60
E - S/. 522.60
02.04.04.04 ACARREO DE MATERIAL EXCEDENTE HASTA D PROM m3 37.44 13.40 S 501.70 -
P - S/. 501.70 501.70
E - S/. 501.70
02.04.04.05 CONCRETO C.H 1:8 EN SOLADO E=2" m3 27.56 14.00 S 385.84 -
P - S/. 385.84 385.84
E - S/. 385.84
02.04.04.06 ENCOFRADO Y DESENCOFRADO m2 93.60 36.11 S 3,379.90 -
P - S/. 3,379.90 3,379.90
E - S/. 3,370.90
02.04.04.07 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 441.22 4.38 S 1,932.54 -
P - S/. 1,932.54 1,932.54
E - 1,932.54
02.04.04.08 CONCRETO f'c=210 kg/cm2 FABRICADO A MANO m3 7.02 505.25 S 3,546.86 -
P - S/. 3,546.86 3,546.86
E - 3,546.86
02.04.04.09 TARRAJEO EN INTERIORES CON IMPERMEABILIZANT m2 67.60 34.07 S 2,303.13 -
P - S/. 2,303.13 2,303.13
E - S/. 2,303.13
02.04.04.10 TARRAJEO EN EXTERIORES (MORTERO 1:3,e=1.50c m2 56.68 17.74 S 1,005.50 -
P - S/. 1,005.50 1,005.50
FORMATO N° 09
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
CONVENIO 1455-2016/VIVIENDA/VMCS/PNSU-NE
FECHA 10/01/2018
OBRA "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE SUCCHIRCA"
COSTO DIRECTO S/. 635,558.03
ÍTEM PARTIDAS UND METR. COSTO COSTO PARC. PERIODO COSTO DIRECTO
UNIT. AGOSTO 2017 SETIEMBRE 2017 OCTUBRE 2017 NOVIEMBRE 2017 DICIEMBRE
1S 2S 3S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S
E - S/. 1,005.50
02.04.04.11 PINTURA ESMALTE m2 56.68 8.45 S 478.95 -
P - S/. 478.95 478.95
E - S/. 478.95
02.04.04.12 TAPA SANITARIA METALICA DE 1/8" DE 0.60m x 0.6 und 13.00 183.09 S 2,380.17 -
P - S/. 2,380.17 2,380.17
E - S/. 2,380.17
02.04.04.13 EQUIPAMIENTO PARA CAMARA ROMPE PRESION TIPOglb 13.00 325.86 S 4,236.18 -
P - S/. 4,236.18 4,236.18
E - S/. 4,236.18
02.04.04.14 REBOSE DE CAMARA ROMPE PRESION TIPO VII glb 13.00 144.50 S 1,878.50 -
P - S/. 1,878.50 1,878.50
E - S/. 1,878.50
02.04.05 VALVULAS DE AIRE (01 UND) - -
02.04.05.01 EXCAVACION MANUAL EN TERRENO SEMI - ROCOSO m3 0.22 114.89 S 25.28 -
P - S/. 25.28 25.28
E - 25.28
02.04.05.02 CAJA DE CONCRETO ARAMADO FC=175kg/cm2 (0.40 und 1.00 759.69 S 759.69 -
P - S/. 759.69 759.69
E - 759.69
02.04.05.03 ACCESORIOS PARA VALVULA DE AIRE EN LINEA DE 1"und 1.00 136.54 S 136.54 -
P - S/. 136.54 136.54
E - 136.54
02.04.06 VALVULAS DE PURGA (08 UND) - -
02.04.06.01 EXCAVACION MANUAL EN TERRENO SEMI - ROCOSO m3 3.04 114.89 S 349.27 -
P - S/. 349.27 349.27
E - 349.27
02.04.06.02 CAJA DE CONCRETO ARAMADO FC=175kg/cm2 (0.40 und 8.00 759.69 S 6,077.52 -
P - S/. 6,077.52 6,077.52
E - 6,077.52
02.04.06.03 ACCESORIOS PARA VALVULA DE PURGA EN LINEA DE und 1.00 136.54 S 136.54 -
P - S/. 136.54 136.54
E - 136.54
02.04.06.04 ACCESORIOS PARA VALVULA DE PURGA EN LINEA DE und 7.00 98.06 S 686.42 -
P - S/. 686.42 686.42
E - 686.42
02.04.07 VALVULAS DE CONTROL (10 UND) - -
02.04.07.01 EXCAVACION MANUAL EN TERRENO SEMI - ROCOSO m3 3.80 114.89 S 436.58 -
P - S/. 436.58 436.58
E - S/. 436.58
02.04.07.02 CAJA DE CONCRETO ARAMADO FC=175kg/cm2 (0.60 und 10.00 759.69 S 7,596.90 -
P - S/. 7,596.90 7,596.90
E - S/. 7,596.90
02.04.07.03 ACCESORIOS PARA VALVULA DE CONTROLEN LINEA Dund 5.00 136.54 S 682.70 -
P - S/. 682.70 682.70
E - S/. 682.70
02.04.07.04 ACCESORIOS PARA VALVULA DE CONTROLEN LINEA Dund 5.00 98.06 S 490.30 -
P - S/. 490.30 490.30
E - 490.30
02.05 CONEXIONES DOMICILIARIAS DE AGUA POTABLE (38 UND) - -
02.05.01 TRAZO Y NIVELACION Y REPLANTEO DE OBRAS LINIAL m 570.00 0.47 S 267.90 -
P - S/. 267.90 267.90
E - 267.90
02.05.02 EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMAm 570.00 5.15 S 2,935.50 -
P - S/. 2,935.50 2,935.50
E - 2,935.50
02.05.03 REFINE Y NIVELACION DE ZANJA PARA TUBERIAS m 570.00 1.34 S 763.80 -
P - S/. 763.80 763.80
E - 763.80
02.05.04 CAMA DE APOYO PARA TUBERIA EN ZANJA DE 0.50M. ,m 570.00 6.29 S 3,585.30 -
P - S/. 3,585.30 3,585.30
E - 2,585.30 1,000.00
02.05.05 RELLENO DE ZANJAS PARA TUB. DE 1/2" CON MATER m 570.00 8.69 S 4,953.30 -
P - S/. 4,953.30 4,953.30
E - 476.56 4,476.74
02.05.06 ACARREO DE MATERIAL EXCEDENTE HASTA D PROM= m3 27.36 13.40 S 366.62 -
P - S/. 366.62 366.62
E - 35.24 331.38
02.05.07 SUMINISTRO E INSTALACION DE TUB. PVC @1/2" C-10 m 570.00 2.42 S 1,379.40 -
P - S/. 1,379.40 1,379.40
FORMATO N° 09
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
CONVENIO 1455-2016/VIVIENDA/VMCS/PNSU-NE
FECHA 10/01/2018
OBRA "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE SUCCHIRCA"
COSTO DIRECTO S/. 635,558.03
ÍTEM PARTIDAS UND METR. COSTO COSTO PARC. PERIODO COSTO DIRECTO
UNIT. AGOSTO 2017 SETIEMBRE 2017 OCTUBRE 2017 NOVIEMBRE 2017 DICIEMBRE
1S 2S 3S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S
E - 132.71 1,246.69
02.05.08 EQUIPAMIENTO PARA CONEXIONES DOMICILIARIA DE und 38.00 153.40 S 5,829.20 -
P - S/. 2,301.00 S/. 2,301.00 1,227.20 5,829.20
E - S/. 2,301.00 2,301.00 1,073.80
LOSA DE CONCRETO FC=175KG/CM2 E=10 CMS FROTACHADA
02.05.09 m2 38.00 34.43 S 1,308.34 -
P - S/. 516.45 S/. 516.45 275.44 1,308.34
E - 516.45 516.45 241.01
03 SANEAMIENTO BASICO - -
03.01 UNIDAD BASICA DE SANEAMIENTO (38UND) - -
03.01.01 CUARTO DE BAÑO - -
03.01.01.01 MOVIMIENTO DE TIERRAS - -
03.01.01.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 426.36 1.00 S 426.36 -
P - S/. 53.30 S/. 53.30 S/. 19.94 S/. 19.94 S/. 19.94 S/. 19.94 S/. 120.00 S/. 109.15 10.85 426.36
E - 258.06 33.66 22.44 56.10 44.88
03.01.01.01.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 66.16 16.75 S 1,108.18 -
P - S/. 138.52 S/. 138.52 S/. 51.84 S/. 51.84 S/. 51.84 S/. 51.84 S/. 311.90 S/. 282.92 28.98 1,108.18
E - 670.67 87.74 58.33 145.81 116.65
03.01.01.01.03 REFINE Y NIVELACION EN TERRENO NORMAL m2 327.94 1.68 S 550.94 -
P - S/. 120.00 S/. 30.00 S/. 30.00 S/. 30.00 S/. 30.00 S/. 30.00 S/. 266.44 14.50 550.94
FORMATO N° 09
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
CONVENIO 1455-2016/VIVIENDA/VMCS/PNSU-NE
FECHA 10/01/2018
OBRA "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE SUCCHIRCA"
COSTO DIRECTO S/. 635,558.03
ÍTEM PARTIDAS UND METR. COSTO COSTO PARC. PERIODO COSTO DIRECTO
UNIT. AGOSTO 2017 SETIEMBRE 2017 OCTUBRE 2017 NOVIEMBRE 2017 DICIEMBRE
1S 2S 3S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S
E - S/. 333.46 S/. 43.51 S/. 28.99 S/. 72.49 S/. 57.99
03.01.01.01.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 7.30 31.66 S 231.12 -
P - S/. 70.00 S/. 15.00 S/. 15.00 S/. 15.00 S/. 15.00 S/. 35.00 S/. 60.10 6.02 231.12
E - S/. 139.62 S/. 18.58 S/. 12.16 S/. 30.41 S/. 24.33
03.01.01.01.05 ACARREO DE MATERIAL EXCEDENTE HASTA D PR m3 70.63 13.40 S 946.44 -
P - S/. 150.00 S/. 300.00 S/. 471.52 24.92 946.44
E - S/. 572.85 S/. 348.67
03.01.01.02 CONCRETO SIMPLE - -
03.01.01.02.01 CONCRETO C.H 1:10+30% P.G EN CIMIENTOS COR m3 52.93 241.03 S 12,757.72 -
P - S/. 1,500.00 S/. 1,000.00 S/. 1,000.00 S/. 1,000.00 S/. 1,000.00 S/. 3,628.86 S/. 3,293.83 335.03 12,757.72
E - S/. 4,700.09 S/. 2,333.33 S/. 722.60 S/. 2,333.33 S/. 2,333.34
03.01.01.02.02 ENCOFRADO Y DESENCOFRADO m2 243.20 36.11 S 8,781.95 -
P - S/. 800.00 S/. 1,000.00 S/. 1,000.00 S/. 1,000.00 S/. 1,000.00 S/. 1,990.97 S/. 1,759.87 231.11 8,781.95
E - S/. 1,848.83 S/. 2,066.67 S/. 502.02 S/. 2,066.66 S/. 2,066.67
03.01.01.02.03 CONCRETO C.H 1:8 +25% P.M.EN SOBRECIMIENTO m3 18.47 251.21 S 4,639.85 -
P - S/. 400.00 S/. 400.00 S/. 400.00 S/. 400.00 S/. 1,519.92 S/. 1,399.35 120.58 4,639.85
E - 977.21 1,066.66 342.06 1,066.67 1,066.67
03.01.01.02.04 VEREDA DE CONCRETO f'c=210 kg/cm2 E=0.15M m2 185.25 68.82 S 12,748.91 -
P - S/. 1,000.00 S/. 1,000.00 S/. 1,000.00 S/. 1,000.00 S/. 4,374.46 S/. 1,690.48 1,341.99 1,341.99 12,748.91
E - 3,354.97 3,354.97 3,354.99 2,348.83
03.01.01.03 CONCRETO ARMADO - -
03.01.01.03.01 LOSA DE APOYO - -
03.01.01.03.01.0 ENCOFRADO Y DESENCOFRADO m2 61.56 36.11 S 2,222.93 -
P - S/. 500.00 S/. 500.00 S/. 611.46 S/. 495.92 115.55 2,222.93
E - 117.36 500.00 256.03 500.00 500.00 233.99 58.50
03.01.01.03.01.0 ACERO fy=4200 Kg/cm2. kg 251.94 4.38 S 1,103.50 -
P - S/. 200.00 S/. 200.00 S/. 351.75 S/. 322.80 28.95 1,103.50
E - 58.17 338.80 338.79 338.79
03.01.01.03.01.0 CONCRETO f'c=210 kg/cm2 m3 5.32 532.05 S 2,830.51 -
P - S/. 385.00 S/. 385.00 S/. 1,030.25 S/. 881.29 148.97 2,830.51
E - 148.98 744.87 744.87 744.87 297.95 106.41
03.01.01.03.02 VIGUETA DE CONFINAMIENTO - -
03.01.01.03.02.0 ENCOFRADO Y DESENCOFRADO m2 65.36 36.11 S 2,360.15 -
P - S/. 800.00 S/. 780.08 S/. 655.85 124.22 2,360.15
E - 662.49 662.50 662.50 S/. 248.44 62.11
03.01.01.03.02.0 ACERO fy=4200 Kg/cm2. kg 567.15 4.38 S 2,484.12 -
P - S/. 900.00 S/. 792.06 S/. 726.71 65.35 2,484.12
E - 806.25 806.26 806.26
03.01.01.03.02.0 CONCRETO f'c=175 kg/cm2 m3 4.94 459.87 S 2,271.76 -
P - S/. 400.00 S/. 935.88 S/. 816.31 S/. 119.57 2,271.76
E - 637.68 637.69 637.69 239.13 59.79
03.01.01.03.03 COLUMNETAS - -
03.01.01.03.03.0 ENCOFRADO Y DESENCOFRADO m2 136.23 36.11 S 4,919.27 -
P - 1,200.00 1,859.63 1,600.73 258.91 4,919.27
E - 1,294.55 258.91 1,294.54 1,294.54 517.82 129.28
03.01.01.03.03.0 ACERO fy=4200 Kg/cm2. kg 696.67 4.38 S 3,051.41 -
P - 950.00 S/. 1,050.70 S/. 970.42 80.29 3,051.41
E - 1,124.21 562.10 160.60 562.10 562.11
03.01.01.03.03.0 CONCRETO f'c=175 kg/cm2 m3 12.10 459.87 S 5,564.43 -
P - 2,782.21 2,490.90 291.32 5,564.43
E - 1,464.40 292.86 1,464.41 1,464.41 584.03 147.16
03.01.01.04 COBERTURAS - -
03.01.01.04.01 SUMINISTRO E INSTALACION DE VIGAS DE MADER und 152.00 29.77 S 4,525.04 -
P - S/. 700.00 S/. 700.00 S/. 1,562.52 S/. 1,324.26 238.26 4,525.04
E - 3,572.40 714.48 119.08
03.01.01.04.02 SUMINISTRO E INSTALACION DE VIGAS DE MADER und 152.00 28.28 S 4,298.56 -
P - 650.00 S/. 650.00 S/. 1,499.28 S/. 1,273.04 226.24 4,298.56
E - 3,393.60 678.72 113.12
03.01.01.04.03 COBERTURA CON TEJA ANDINA m2 430.16 51.21 S 22,028.49 -
P - 4,500.00 4,500.00 S/. 5,000.00 S/. 5,000.00 S/. 1,869.10 1,159.39 22,028.49
E - 17,390.92 3,478.18 580.72
03.01.01.04.04 JUNTA DE TECKNOPOR m2 30.02 4.39 S 131.79 -
P - S/. 20.90 S/. 20.90 S/. 45.00 S/. 38.06 6.94 131.79
E - 62.42 62.43 3.47
03.01.01.05 ARQUITECTURA Y ACABADOS - -
03.01.01.05.01 MURO DE LADRILLO K.K.DE ARCILLA CARA VISTA m2 679.06 50.63 S 34,380.81 -
P - S/. 4,000.00 S/. 7,595.21 S/. 7,595.20 S/. 7,595.20 S/. 5,785.68 1,809.52 34,380.81
E - 904.76 9,047.58 904.76 9,047.58 9,047.58 3,619.03 904.76
03.01.01.05.02 TARRAJEO INTERIOR (MORTERO 1:5, e=1,50cm) m2 201.78 18.62 S 3,757.14 -
P - S/. 180.00 S/. 1,300.00 S/. 1,300.00 S/. 779.40 197.74 3,757.14
FORMATO N° 09
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
CONVENIO 1455-2016/VIVIENDA/VMCS/PNSU-NE
FECHA 10/01/2018
OBRA "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE SUCCHIRCA"
COSTO DIRECTO S/. 635,558.03
ÍTEM PARTIDAS UND METR. COSTO COSTO PARC. PERIODO COSTO DIRECTO
UNIT. AGOSTO 2017 SETIEMBRE 2017 OCTUBRE 2017 NOVIEMBRE 2017 DICIEMBRE
1S 2S 3S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S
E - 889.85 889.85 889.85 889.85 98.87
03.01.01.05.03 PISO DE CONCRETO FC=140KG/CM2 ACABADO PULm2 65.74 60.50 S 3,977.27 -
P - S/. 900.00 S/. 1,200.00 S/. 362.68 S/. 677.27 418.66 418.66 3,977.27
E - 1,046.65 1,046.65 1,046.65 733.26
03.01.01.05.04 SARDINEL DE DE CONCRETO EN DUCHA 0.10X0.1 m 38.00 22.98 S 873.24 -
P - S/. 150.00 S/. 150.00 S/. 150.00 S/. 423.24 873.24
E - 229.80 229.80 229.80 S/. 160.86
03.01.01.05.05 ZOCALO DE CEMENTO PULIDO MORTERO 1:4 m2 336.60 20.29 S 6,829.61 -
P - S/. 1,400.00 S/. 1,400.00 S/. 1,400.00 S/. 2,270.48 S/. 359.13 6,829.61
E - 1,617.62 1,617.62 1,078.41 1,078.41 1,078.42 S/. 179.77
03.01.01.05.06 PUERTA DE MADERA CON MARCOS DE MADERA (0. und 38.00 363.94 S 13,829.72 -
P - S/. 6,914.86 S/. 6,914.86 13,829.72
E - S/. 9,826.38 S/. 1,810.70 S/. 1,810.70
03.01.02 LAVATORIO - -
03.01.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 37.62 1.00 S 37.62 -
P - S/. 5.00 S/. 12.00 S/. 12.00 S/. 6.64 1.98 37.62
E - 7.42 7.43 10.40 10.39 0.99
03.01.02.02 ENCOFRADO Y DESENCOFRADO m2 277.40 36.11 S 10,016.91 -
P - S/. 2,000.00 S/. 2,672.30 S/. 2,672.30 S/. 1,090.33 790.99 790.99 10,016.91
FORMATO N° 09
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
CONVENIO 1455-2016/VIVIENDA/VMCS/PNSU-NE
FECHA 10/01/2018
OBRA "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE SUCCHIRCA"
COSTO DIRECTO S/. 635,558.03
ÍTEM PARTIDAS UND METR. COSTO COSTO PARC. PERIODO COSTO DIRECTO
UNIT. AGOSTO 2017 SETIEMBRE 2017 OCTUBRE 2017 NOVIEMBRE 2017 DICIEMBRE
1S 2S 3S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S
E - 1,318.01 1,318.02 1,932.96 1,932.97 1,932.97 659.01 659.01
03.01.02.03 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 298.30 4.38 S 1,306.55 -
P - S/. 250.00 S/. 352.19 S/. 352.18 S/. 283.46 68.72 1,306.55
E - 171.91 171.92 298.00 298.00 298.00 34.38
03.01.02.04 CONCRETO f'c=175 kg/cm2 m3 10.26 459.87 S 4,718.27 -
P - S/. 900.00 S/. 1,200.00 S/. 1,200.00 S/. 673.28 S/. 372.50 S/. 372.49 4,718.27
E - 1,324.42 1,324.43 1,324.43 S/. 312.71 S/. 312.71
03.01.02.05 TARRAJEO INTERIOR (MORTERO 1:5, e=1,50cm) m2 201.78 18.19 S 3,670.38 -
P - S/. 500.00 S/. 950.00 S/. 950.00 S/. 691.03 S/. 289.67 S/. 289.68 3,670.38
E - 1,030.34 1,030.34 1,030.35 S/. 241.47 S/. 241.47
03.01.02.06 SUMINISTRO E INSTALACION DE ACCESORIO EN L und 38.00 38.81 S 1,474.78 -
P - S/. 368.70 S/. 329.88 S/. 388.10 S/. 388.10 1,474.78
E - 349.29 349.29 S/. 349.29 S/. 194.05 S/. 194.05
03.01.03 INSTALACIONES SANITARIAS - -
03.01.03.01 TRAZO Y REPLANTEO PRELIMINAR m2 232.45 1.00 S 232.45 -
P - S/. 45.45 S/. 62.33 S/. 62.33 S/. 50.10 12.24 232.45
E - 65.25 65.25 65.25 24.47 6.12
03.01.03.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 59.74 16.75 S 1,000.65 -
P - S/. 180.00 S/. 273.55 S/. 273.55 S/. 221.12 52.43 1,000.65
E - 280.95 280.95 280.96 105.36 26.30
03.01.03.03 CAMA DE ARENA h=0.10 m2 663.86 9.69 S 6,432.80 -
P - S/. 1,500.00 S/. 1,716.40 S/. 1,716.40 S/. 1,161.43 338.57 6,432.80
E - 1,579.99 1,579.99 1,579.98 677.13 677.14 169.38
03.01.03.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 181.83 31.66 S 5,756.74 -
P - S/. 1,200.00 S/. 1,678.37 S/. 1,678.37 S/. 897.33 302.67 5,756.74
E - 1,363.44 1,363.44 1,363.59 1,363.60 151.65
03.01.03.05 ACARREO DE MATERIAL EXCEDENTE HASTA D PRO m3 23.17 13.40 S 310.48 -
P - S/. 77.62 S/. 77.62 S/. 138.89 S/. 16.35 310.48
E - 228.74 32.69 32.70 8.31
03.01.03.06 SUMINISTRO E INSTALACION DE TUB. PVC @1/2" C-1m 836.76 2.42 S 2,024.96 -
P - S/. 506.24 S/. 506.24 S/. 506.24 S/. 399.66 106.58 2,024.96
E - 479.59 479.60 479.59 479.60 53.29
03.01.03.07 SUMINISTRO E INSTALACION DE TUB. PVC @ 2" C-10 m 245.48 7.73 S 1,897.56 -
P - S/. 474.39 S/. 474.39 S/. 474.39 S/. 371.04 103.35 1,897.56
E - 448.53 448.54 448.57 448.57 49.94
03.01.03.08 SUMINISTRO E INSTALACION DE ACCESORIO DE AG glb 38.00 377.32 S 14,338.16 -
P - S/. 3,584.54 S/. 3,584.54 S/. 377.32 2,263.92 2,263.92 2,263.92 14,338.16
E - 1,886.60 1,886.60 1,886.60 1,886.60 3,018.56 1,509.28 1,886.60
03.01.03.09 SUMINISTRO E INSTALACION DE ACCESORIO -DESA glb 38.00 1,004.42 S 38,167.96 -
P - S/. 9,541.99 S/. 9,541.99 S/. 1,004.42 6,026.52 6,026.52 6,026.52 38,167.96
E - 5,022.10 5,022.10 5,022.10 5,022.10 8,035.36 4,017.68 5,022.10
03.01.03.10 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE m 836.76 0.88 S 736.35 -
P - S/. 300.00 S/. 300.00 S/. 136.35 736.35
E - 736.35
03.01.03.11 PRUEBA HIDRAULICA EN REDES DE DESAGUE m 245.48 0.69 S 169.38 -
P - S/. 60.00 S/. 60.00 S/. 49.38 169.38
E - 169.38
03.01.03.12 CAJA DE REGISTRO 12"x24" CON MARCO Y TAPA DE Cund 38.00 80.97 S 3,076.86 -
P - S/. 1,200.00 S/. 1,229.10 S/. 647.76 3,076.86
E - S/. 809.70 S/. 809.70 S/. 809.70 566.79
03.01.03.13 TAPA METALICA PARA COMPOSTERA und 76.00 145.00 S 11,020.00 -
P - S/. 1,740.00 S/. 4,350.00 S/. 4,350.00 S/. 580.00 11,020.00
E - S/. 3,480.00 S/. 3,480.00 S/. 3,480.00 290.00
03.01.04 POZO DE PERCOLACION - -
03.01.04.01 TRAZO Y REPLANTEO PRELIMINAR m2 76.38 1.00 S 76.38 -
P - S/. 15.00 S/. 25.00 S/. 34.37 2.01 76.38
E - 46.23 14.07 14.07
03.01.04.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 145.16 16.75 S 2,431.43 -
P - S/. 600.00 S/. 600.00 S/. 600.00 S/. 567.61 63.82 2,431.43
E - 895.79 S/. 490.60 S/. 490.61 S/. 490.61
03.01.04.03 ACARREO DE MATERIAL EXCEDENTE HASTA D PRO m3 174.42 13.40 S 2,337.23 -
P - S/. 700.00 S/. 700.00 S/. 875.72 61.51 2,337.23
E - 861.22 S/. 471.50 S/. 471.50 S/. 471.50
03.01.04.04 CONCRETO C.H 1:8 +25% P.M.EN SOBRECIMIENTOS m3 4.18 251.21 S 1,050.06 -
P - S/. 200.00 S/. 425.03 S/. 369.77 55.26 1,050.06
E - 55.27 S/. 230.28 S/. 230.27 S/. 230.28 248.70 25.12
03.01.04.05 MURO DE LADRILLO K.K.DE ARCILLA APAREJO DE m2 190.76 50.63 S 9,658.18 -
P - S/. 1,500.00 S/. 2,719.39 S/. 2,719.39 S/. 2,211.06 508.34 9,658.18
E - S/. 2,287.46 S/. 2,287.46 S/. 2,287.47 1,143.73 1,143.73 254.67
03.01.04.06 ENCOFRADO Y DESENCOFRADO m2 90.06 36.11 S 3,252.07 -
FORMATO N° 09
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
CONVENIO 1455-2016/VIVIENDA/VMCS/PNSU-NE
FECHA 10/01/2018
OBRA "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE SUCCHIRCA"
COSTO DIRECTO S/. 635,558.03
ÍTEM PARTIDAS UND METR. COSTO COSTO PARC. PERIODO COSTO DIRECTO
UNIT. AGOSTO 2017 SETIEMBRE 2017 OCTUBRE 2017 NOVIEMBRE 2017 DICIEMBRE
1S 2S 3S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S
P - S/. 600.00 S/. 884.02 S/. 884.03 S/. 884.02 3,252.07
E - 1,583.24 1,583.25
03.01.04.07 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 281.58 4.38 S 1,233.32 -
P - S/. 200.00 S/. 516.66 S/. 516.66 1,233.32
E - 600.43 600.43
03.01.04.08 CONCRETO f'c=175 kg/cm2 m3 7.60 459.87 S 3,495.01 -
P - S/. 800.00 S/. 1,347.51 S/. 1,347.51 3,495.01
E - 1,701.52 1,701.52
03.01.04.09 FILTRO DE GRAVA 1 1/2,2 Y 21/2" m3 58.90 167.62 S 9,872.82 -
P - S/. 2,000.00 S/. 3,936.41 S/. 558.87 1,688.77 1,688.77 9,872.82
E - S/. 2,208.40 S/. 2,208.39 2,078.49 1,558.86 1,558.87
03.01.04.10 TAPA DE CONCRETO D=0.60m und 38.00 268.56 S 10,205.28 -
P - S/. 2,147.68 S/. 4,028.80 S/. 4,028.80 10,205.28
E - 4,968.36 4,968.36
03.01.04.11 PRUEBA DE CALIDAD DEL CONCRETO und 190.00 22.00 S 4,180.00 -
P - 660.00 S/. 704.00 S/. 704.00 S/. 704.00 S/. 704.00 S/. 704.00 4,180.00
E - 220.00 220.00 220.00 110.00
04 MITIGACION AMBIENTAL - -
04.01 MANEJO DE RESIDUOS SOLIDOS - -
04.01.01 IMPLEMENTACION DE DEPOSITOS RECOLECTORES DE Rund 10.00 33.66 S 336.60 -
P - S/. 336.60 336.60
E - -
04.01.02 MANEJO DE RESIDUOS DE OBRA DURANTE LA EJECUCI mes 3.00 1,565.04 S 4,695.12 -
P - S/. 391.26 S/. 391.26 S/. 391.26 S/. 391.26 S/. 391.26 S/. 391.26 S/. 391.26 S/. 391.26 S/. 391.26 S/. 391.26 S/. 782.52 4,695.12
E - -
04.02 MITIGACION,PREVENCION Y CONTROL - -
04.02.01 RIEGO Y HUMEDECIMIENTO km 2.75 44.76 S 123.09 -
P - S/. 41.03 S/. 82.06 123.09
E - -
04.02.02 REPOSICION DE COBERTURA VEGETAL m2 740.05 6.85 S 5,069.34 -
P - S/. 2,534.67 S/. 2,534.67 5,069.34
E - -
04.03 SEGUIMIENTO Y CONTROL - -
04.03.01 MONITOREO DE AGUA Y RUIDO glb 1.00 2,500.00 S 2,500.00 -
P - S/. 227.27 S/. 227.27 S/. 227.27 S/. 227.27 S/. 227.27 S/. 227.27 S/. 227.27 S/. 227.28 S/. 227.27 S/. 227.29 S/. 227.27 2,500.00
E - -
04.04 MANEJO DE CONTINGENCIAS Y PARTICIPACION CIUDADANA - -
04.04.01 IMPLEMENTACION DE KIT ANTIDERRAME glb 1.00 450.00 S 450.00 -
P - S/. 450.00 450.00
E - -
04.04.02 CAPACITACION Y SIMULACROS AMBIENTALES mes 3.00 346.00 S 1,038.00 -
P - S/. 1,038.00 1,038.00
E - -
04.04.03 CIERRE Y ABANDONO DE OBRA glb 1.00 500.00 S 500.00 -
P - S/. 500.00 500.00
E - -
04.04.04 PRESENTACION DE INFORMES AL MVCS und 3.00 120.00 S 360.00 -
P - S/. 360.00 360.00
E - -
05 PLAN DE MONITOREO ARQUEOLOGICO - -
05.01 IMPLEMENTACION DE PLAN DE MONITOREO - -
05.01.01 IMPLEMENTACION DE PLAN DE MONITOREO ARQUEOL mes 3.00 2,000.00 S 6,000.00 -
P - S/. 500.00 S/. 500.00 S/. 500.00 S/. 500.00 S/. 500.00 S/. 500.00 S/. 500.00 S/. 500.00 S/. 500.00 S/. 500.00 S/. 1,000.00 6,000.00
E - 666.67 666.67 666.67 600.00 200.00 600.00 600.00 600.00 600.00 600.00 200.00
05.02 MATERIALES Y MOVILIDAD - -
05.02.01 MATERIAL DE CAMPO PARA MONITOREO ARQUEOLOGI mes 3.00 600.00 S 1,800.00 -
P - S/. 117.50 S/. 160.00 S/. 160.00 S/. 140.00 S/. 160.00 S/. 160.00 S/. 160.00 S/. 220.00 S/. 160.00 S/. 160.00 S/. 202.50 1,800.00
E - 900.00 900.00
05.02.02 UTILES DE OFICINA mes 3.00 250.00 S 750.00 -
P - S/. 77.00 S/. 64.00 S/. 64.00 S/. 56.00 S/. 64.00 S/. 64.00 S/. 64.00 S/. 56.00 S/. 64.00 S/. 64.00 S/. 113.00 750.00
E - 375.00 375.00
05.03 PAGOS AL MINISTERIO DE CULTURA - -
05.03.01 PRESENTACION Y PROBACION DEL PLAN DE MONITO und 1.00 1,932.80 S 1,932.80 -
P - S/. 1,932.80 1,932.80
E - 1,932.80
05.03.02 APROBACION DEL INFORME FINAL und 1.00 1,098.90 S 1,098.90 -
P - S/. 1,098.90 1,098.90
E - S/. 1,098.90
06 FLETES - -
06.01 FLETE TERRESTRE glb 1.00 34,061.56 S 34,061.56 -
FORMATO N° 09
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
CONVENIO 1455-2016/VIVIENDA/VMCS/PNSU-NE
FECHA 10/01/2018
OBRA "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS , DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO DE SUCCHIRCA"
COSTO DIRECTO S/. 635,558.03
ÍTEM PARTIDAS UND METR. COSTO COSTO PARC. PERIODO COSTO DIRECTO
UNIT. AGOSTO 2017 SETIEMBRE 2017 OCTUBRE 2017 NOVIEMBRE 2017 DICIEMBRE
1S 2S 3S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S 3S 4S 1S 2S
P - S/. 6,812.31 S/. 6,812.31 S/. 2,128.84 S/. 2,128.84 S/. 2,128.84 S/. 2,128.84 S/. 3,973.84 S/. 3,973.84 S/. 3,973.90 34,061.56
E - S/. 10,218.47 S/. 7,947.70 S/. 7,947.70 S/. 7,947.69
06.02 FLETE RURAL glb 1.00 20,000.00 S 20,000.00 -
P - S/. 4,000.00 S/. 4,000.00 S/. 1,250.00 S/. 1,250.00 S/. 1,250.00 S/. 1,250.00 S/. 2,333.34 S/. 2,333.33 S/. 933.33 S/. 1,400.00 20,000.00
E - 6,000.00 1,750.00 1,750.00 1,750.00 1,750.00 1,866.67 1,866.66 1,866.67 400.00 500.00 500.00
SUB TOTAL DEL PRESUPUESTO SANEAMIENTO 636,052.03 14,516.03 34,992.94 40,073.37 39,955.39 37,488.30 23,613.82 27,227.54 80,522.98 75,079.65 47,330.11 29,208.66 - 28,366.05 36,077.46 51,328.76 36,962.04 33,308.95 636,052.03
AVANCE MENSUAL PRESUPUESTO SANEAMIENTO (%) 14.08% 20.2% 36.50% 18.20% 11.05% 1.00
COSTO TOTAL DIRECTO PROGRAMADO (SEMANAL) 636,052.03 14,516.03 34,992.94 40,073.37 39,955.39 37,488.30 23,613.82 27,227.54 80,522.98 75,079.65 47,330.11 29,208.66 - 28,366.05 36,077.46 51,328.76 36,962.04 33,308.95 636,052.03
COSTO TOTAL DIRECTO PROGRAMADO (MENSUAL) 89,582.33 128,285.05 232,141.40 115,772.26 70,270.99
COSTO TOTAL DIRECTO PROGRAMADO ACUMULADO 89,582.33 217,867.38 450,008.78 565,781.04 636,052.03
TESORERO NE RESIDENTE
KELI RUT PÉREZ TORRES ING. GILMER HUAMÁN MENDOZA
DNI N. 46902073 DNI N° 26685493
PRESUPUESTO AVANCE
SALDOMES
POR EJECTUTAR
PARTIDA DESCRIPCIÓN DICIEMBRE
Unid Metrado Metrado Metrado
01 TRABAJOS PRELIMINARES Y OBRAS PROVISIONALES
01.01 ALMACEN Y GUARDIANIA und 3.00 ###
-
01.02 CARTEL DE IDENTIFICACION DE OBRA 2.40X3.60M und 1.00 ###
-
01.03 PLACA RECORDATORIA DE BRONCE DE 0.40X0.60M und 1.00 1.00
###
02 AGUA POTABLE -
02.01 CAPTACION -
02.01.01 CAPTACIÓN DE LADERA -
02.01.01.01 TRABAJOS PRELIMINARES -
02.01.01.01.01 DESVIO DE AGUA EN MANANTIAL glb 1.00 ###
-
02.01.01.01.02 LIMPIEZA DEL TERRENO MANUAL m2 30.84 ###
-
02.01.01.01.03 TRAZO Y REPLANTEO PRELIMINAR m2 30.84 ###
-
02.01.01.02 MOVIMIENTO DE TIERRAS -
02.01.01.02.01 EXCAVACION MANUAL EN TERRENO SEMI-ROCOS m3 17.67 ###
-
02.01.01.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 3.03 ###
-
02.01.01.02.03 ZANJA DE CORONACION TRAPEZOIDAL REVESTID m 3.30 ###
-
02.01.01.02.04 ACARREO DE MATERIAL EXCEDENTE HASTA D P m3 21.47 ###
-
02.01.01.02.05 SUMINISTRO Y COLOCACION DE FILTRO DE GRAV m3 0.83 ###
-
02.01.01.03 OBRAS DE CONCRETO SIMPLE -
02.01.01.03.01 CONCRETO CH 1:8 EN SOLADO, e=2" m3 3.03 ###
-
02.01.01.03.02 CONCRETO f'c=140kg/cm2 FABRICADO A MANO m3 0.02 ###
-
02.01.01.04 CONCRETO ARMADO -
02.01.01.04.01 ENCOFRADO Y DESENCOFRADO m2 20.16 ###
-
02.01.01.04.02 ACERO fy=4200 Kg/cm2. kg 104.43 ###
-
02.01.01.04.03 CONCRETO f'c=210 kg/cm2 FABRICADO A MANO m3 2.90 ###
-
02.01.01.05 REVOQUES Y ENLUCIDOS -
02.01.01.05.01 TARRAJEO EN INTERIORES CON IMPERMEABILIZ m2 16.18 ###
-
02.01.01.05.02 TARRAJEO EN EXTERIORES (MORTERO 1:5, e=1. m2 4.12 ###
-
02.01.01.05.03 PINTURA ESMALTE m2 4.12 ###
-
02.01.01.06 VALVULAS Y ACCESORIOS -
02.01.01.06.01 CANASTILLA DE PVC DIAM. 2" und 1.00 ###
-
02.01.01.06.02 UNION PVC SP DIAM. 1 1/2" und 1.00 ###
-
02.01.01.06.03 UNION PVC SP DIAM. 2" und 2.00 ###
-
02.01.01.06.04 ADAPTADOR PR PVC DIAM. 1 1/2" und 2.00 ###
-
02.01.01.06.05 VALVULA COMPUERTA DE BRONCE DE 1 1/2" und 1.00 ###
-
02.01.01.06.06 CONO DE REBOSE PVC SP 4" und 1.00 ###
-
02.01.01.06.07 CODO PVC C-10 DIAM 2"x90° und 5.00 ###
-
02.01.01.06.08 UNION UNIVERSAL PVC DIAM.= 1 1/ 2" und 2.00 ###
-
02.01.01.06.09 TEE PVC C-10 DIAM. 2" und 2.00 ###
-
02.01.01.06.10 TAPON PVC C 10 DIAM 2" und 2.00 ###
-
02.01.01.06.11 SUMINISTRO E INSTALACION DE TUB. PVC DESA m 3.00 ###
-
02.01.01.06.12 SUMINISTRO Y E INSTALACION DE TUB. PVC DIAM.m 2.00 ###
-
02.01.01.07 VARIOS -
02.01.01.07.01 TAPA SANITARIA METALICA DE 1/8" DE 0.60x0. und 2.00 ###
-
02.01.01.08 CERCO DE PROTECCION EN CAPTACION -
02.01.01.08.01 CERCO PERIMETRICO CON ALAMBRE DE PUAS X 6 m 21.20 21.20
###
02.01.01.08.02 POSTE DE MADERA TORNILLO 3" x 3" x 1.95M und 9.00 9.00
###
02.01.01.01.03 POSTE DE MADERA CON ALAMBRE DE PUAS 0.80x und 1.00 1.00
###
02.02 1.30M
LINEA DE CONDUCCION -
02.02.01 TRABAJOS PRELIMINARES -
02.02.01.01 TRAZO, NIVELACION Y REPLANTEO DE OBRAS LINE m 1,150.00 ###
-
02.02.01.02 DESBROCE Y LIMPIEZA DE TERRENO m 1,150.00 ###
-
02.02.02 MOVIMIENTO DE TIERRAS -
02.02.02.01 EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMALm 1,150.00 ###
-
02.02.02.02 EXCAVACION MANUAL EN TERRENO SEMI - ROCOSO m3 9.43 ###
-
02.02.02.03 REFINE Y NIVELACION DE ZANJA PARA TUBERIAS m2 517.09 ###
-
02.02.03 OBRAS DE CONCRETO SIMPLE -
02.02.03.01 CONCRETO CH 1:8 EN SOLADO, e=2" m2 2.77 ###
-
02.02.03.02 ENCOFRADO Y DESENCOFRADO m2 12.00 ###
-
02.02.03.03 CONCRETO f'c=140 kg/cm2 FABRICADO A MANO, m3 1.60 ###
-
02.02.04 TUBERIAS Y ACCESORIOS -
02.02.04.01 SUMINISTRO E INSTALACION DE TUB. HDP 32mmx1 m 1,150.00 ###
-
02.02.04.02 PRUEBAS HIDRAULICA Y DESINFECCION EN REDES m 1,150.00 1,150.00
###
02.02.05 PASES AEREOS -
02.02.05.01 MOVIMIENTO DE TIERRAS -
02.02.05.01.01 EXCAVACION MANUAL EN TERRENO SEMI-ROCOS m3 5.86 5.86
###
02.02.05.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 0.94 0.94
###
02.02.05.01.03 REFINE Y NIVELACION EN TERRENO NORMAL m2 4.88 4.88
###
02.02.05.02 OBRAS DE CONCRETO SIMPLE -
02.02.05.02.01 CONCRETO f'c=175 kg/cm2 m3 4.88 4.88
###
02.02.05.02.02 CONCRETO CH 1:8 EN SOLADO, e=2" m2 2.00 2.00
###
02.02.05.03 CONCRETO ARMADO -
02.02.05.03.01 CONCRETO f'c=210 kg/cm2, PARA ZAPATAS FA m3 2.88 2.88
###
02.02.05.03.02 CONCRETO f'c=210 kg/cm2, PARA COLUMNAS m3 0.49 0.49
###
02.02.05.03.03 ENCOFRADO Y DESENCOFRADO m2 6.48 6.48
###
02.02.05.03.04 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 103.68 103.68
###
OBRA:
"MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS ,
DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO
DE SUCCHIRCA"
PRESUPUESTO AVANCE
SALDOMES
POR EJECTUTAR
PARTIDA DESCRIPCIÓN DICIEMBRE
Unid Metrado Metrado Metrado
02.02.05.03.05 TARRAJEO EN EXTERIORES (MORTERO 1:3,e=1. m2 6.48 6.48
###
02.02.05.04 CABLES Y ACCESORIOS -
02.02.05.04.01 SUMINISTRO E INSTALACIÓN DE CABLE DE ACERO m 45.00 45.00
###
02.02.05.04.02 SUMINISTRO E INSTALACIÓN DE ABRAZADERAS und 15.00 15.00
###
02.02.05.04.03 SUMINISTRO E INSTALACIÓN DE PENDOLAS und 15.00 15.00
###
02.02.05.04.04 SUMINISTRO E INSTALACIÓN DE TEMPLADORES und 15.00 15.00
###
02.02.05.04.05 SUMINISTRO E INSTALACIÓN DE ELEMENTOS EM und 2.00 2.00
###
02.02.06 CAMARA ROMPE PRESION TIPO 6 (06 UND) -
02.02.06.01 LIMPIEZA DEL TERRENO MANUAL m2 18.00 ###
-
02.02.06.02 TRAZO Y REPLANTEO PRELIMINAR m2 18.00 ###
-
02.02.06.03 EXCAVACION MANUAL EN TERRENO NORMAL m3 14.40 ###
-
02.02.06.04 ACARREO DE MATERIAL EXCEDENTE HASTA D PRO m3 17.28 ###
-
02.02.06.05 CONCRETO C.H 1:8 EN SOLADO E=2" m3 12.72 ###
-
02.02.06.06 ENCOFRADO Y DESENCOFRADO m2 43.20 ###
-
02.02.06.07 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 241.92 ###
-
02.02.06.08 CONCRETO f'c=210 kg/cm2 FABRICADO A MANO m3 3.24 ###
-
02.02.06.09 TARRAJEO EN INTERIORES CON IMPERMEABILIZANT m2 31.20 ###
-
02.02.06.10 TARRAJEO EN EXTERIORES (MORTERO 1:3,e=1.50 m2 26.16 ###
-
02.02.06.11 PINTURA ESMALTE m2 26.16 ###
-
02.02.06.12 TAPA SANITARIA METALICA DE 1/8" DE 0.60m x 0. und 6.00 ###
-
02.02.06.13 EQUIPAMIENTO PARA CAMARA ROMPE PRESION TIPOglb 6.00 ###
-
02.02.06.14 REBOSE DE CAMARA ROMPE PRESION TIPO VI glb 6.00 ###
-
02.03 RESERVORIO -
02.03.01 RESERVORIO DE 5.00 m3 -
02.03.01.01 LIMPIEZA DEL TERRENO MANUAL m2 29.33 ###
-
02.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 29.33 ###
-
02.03.01.03 EXCAVACION MANUAL EN TERRENO NORMAL m3 12.31 ###
-
02.03.01.04 REFINE Y NIVELACION EN TERRENO NORMAL m2 29.33 ###
-
02.03.01.05 RELLENO COMPACTADO CON MATERIAL PROPIO m3 0.66 ###
-
02.03.01.06 ACARREO DE MATERIAL EXCEDENTE HASTA D PRO m3 14.77 ###
-
02.03.01.07 CONCRETO C.H 1:8 EN SOLADO E=2" m3 6.16 ###
-
02.03.01.08 VEREDA DE CONCRETO f'c=140 kg/cm2 m3 7.96 ###
-
02.03.01.09 CUNETA REVESTIDA DE CONCRETO f'c=140 kg/cm m 15.40 ###
-
02.03.01.10 ENCOFRADO Y DESENCOFRADO m2 35.22 ###
-
02.03.01.11 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 547.99 ###
-
02.03.01.12 CONCRETO f'c=210 kg/cm2 FABRICADO A MANO m3 9.14 ###
-
02.03.01.13 TARRAJEO EN INTERIORES CON IMPERMEABILIZANT m2 15.30 ###
-
02.03.01.14 TARRAJEO EN EXTERIORES (MORTERO 1:3,e=1.50 m2 14.10 ###
-
02.03.01.15 PINTURA ESMALTE m2 14.10 ###
-
02.03.02 CUARTO DE VALVULAS -
02.03.02.01 EXCAVACION MANUAL EN TERRENO SEMI-ROCOSO m3 3.55 ###
-
02.03.02.02 ACARREO DE MATERIAL EXCEDENTE HASTA D PR m3 4.20 ###
-
02.03.02.03 ENCOFRADO Y DESENCOFRADO m2 20.53 ###
-
02.03.02.04 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 222.21 ###
-
02.03.02.05 CONCRETO FC=210 Kg/cm2 FABRICADO A MANO m3 2.34 ###
-
02.03.02.06 TARRAJEO EN INTERIORES CON IMPERMEABILIZANT m2 15.30 ###
-
02.03.02.07 TARRAJEO EN EXTERIORES (MORTERO 1:3,e=1.50 m2 14.10 ###
-
02.03.03 EQUIPAMIENTO -
02.03.03.01 EQUIPAMIENTO PARA RESERVORIO DE 5.00 m3 glb 1.00 ###
-
02.03.03.02 ESCALERA MARINERA F°G" 2" Y 3/4" m 5.50 ###
-
02.03.03.03 ESCALERA TIPO GATO F°G" 5/8" und 3.00 ###
-
02.03.03.04 TAPA SANITARIA METALICA DE 1/8" DE 0.60m x 0. und 1.00 ###
-
02.03.03.05 TAPA SANITARIA METALICA DE 1/4" D= 0.60m und 1.00 ###
-
02.03.03.06 TUBERIA DE F°G° DE 1 1/2" m 38.00 ###
-
02.03.03.07 MALLA METALICA CON ALAMBRE N°12 COCADAS DEm2 25.20 ###
-
02.03.03.08 PUERTA METALICA TUBOS DE F°G° Y MALLA (0.80 und 1.00 ###
-
02.03.03.09 TANQUE DE HIPOCLORITO DE 50 lt und 1.00 ###
-
02.03.04 CERCO PERIMETRICO -
02.03.04.01 CERCO PERIMETRICO CON ALAMBRE DE PUAS X 6 H m 35.20 35.20
###
02.03.04.02 POSTE DE MADERA TORNILLO 3" x 3" x 1.95M und 14.00 14.00
###
02.03.04.03 PUERTA DE MADERA CON ALAMBRE DE PUAS 0.80 xund 1.00 1.00
###
02.04 LINEA DE ADUCCION Y DISTRIBUCION -
02.04.01 TRABAJOS PRELIMINARES -
02.04.01.01 TRAZO, NIVELACION Y REPLANTEO DE OBRAS LINE m 2,859.35 ###
-
02.04.02 MOVIMIENTO DE TIERRAS -
02.04.02.01 EXCAVACION MANUAL DE ZANJAS EN TERRENO NORm 2,859.35 ###
-
02.04.02.02 REFINE Y NIVELACION DE ZANJA PARA TUBERIAS m 2,859.35 ###
-
02.04.02.03 CAMA DE APOYO PARA TUBERIA EN ZANJA DE 0.50Mm 2,859.35 ###
-
02.04.02.04 RELLENO COMPACTADO DE ZANJAS CON MATERIAL m 2,859.35 ###
-
02.04.02.05 ACARREO DE MATERIAL EXCEDENTE HASTA D PR m3 85.63 ###
-
02.04.03 TUBERIAS Y ACCESORIOS -
02.04.03.01 SUMINISTRO E INSTALACION DE TUB. PVC @1" C-10m 869.81 ###
-
02.04.03.02 SUMINISTRO E INSTALACION DE TUB. PVC @3/4" C-m 1,989.54 ###
-
02.04.03.03 TUBERIA DE F°G° DE 3/4" m 45.00 ###
-
02.04.03.04 CODO PVC C-10 @1" x 90° und 5.00 ###
-
OBRA:
"MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS ,
DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO
DE SUCCHIRCA"
PRESUPUESTO AVANCE
SALDOMES
POR EJECTUTAR
PARTIDA DESCRIPCIÓN DICIEMBRE
Unid Metrado Metrado Metrado
02.04.03.05 CODO PVC C-10 @1" x 45° und 11.00 ###
-
02.04.03.06 CODO PVC C-10 @1" x 22.5° und 17.00 ###
-
02.04.03.07 CODO PVC C-10 @3/4" X 90° und 1.00 ###
-
02.04.03.08 CODO PVC C-10 @3/4" X 45° und 9.00 ###
-
02.04.03.09 CODO PVC C-10 @3/4" X 22.5° und 47.00 ###
-
02.04.03.10 TEE PVC C-10 @1" x 3/4" und 1.00 ###
-
02.04.03.11 TEE PVC C-10 @3/4" und 5.00 ###
-
02.04.03.12 INSTALACION DE ACCESORIOS SANITARIOS 1/2" A 1 und 97.00 ###
-
02.04.03.13 PRUEBA HIDRAULICA Y DESINFECCION EN REDES D m 2,859.35 2,859.35
###
02.04.04 CAMARA ROMPE PRESION TIPO 7 (13 UND) -
02.04.04.01 LIMPIEZA DEL TERRENO MANUAL m2 28.73 ###
-
02.04.04.02 TRAZO Y REPLANTEO PRELIMINAR m2 28.73 ###
-
02.04.04.03 EXCAVACION MANUAL EN TERRENO NORMAL m3 31.20 ###
-
02.04.04.04 ACARREO DE MATERIAL EXCEDENTE HASTA D PRO m3 37.44 ###
-
02.04.04.05 CONCRETO C.H 1:8 EN SOLADO E=2" m3 27.56 ###
-
02.04.04.06 ENCOFRADO Y DESENCOFRADO m2 93.60 ###
-
02.04.04.07 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 441.22 ###
-
02.04.04.08 CONCRETO f'c=210 kg/cm2 FABRICADO A MANO m3 7.02 ###
-
02.04.04.09 TARRAJEO EN INTERIORES CON IMPERMEABILIZANT m2 67.60 ###
-
02.04.04.10 TARRAJEO EN EXTERIORES (MORTERO 1:3,e=1.50 m2 56.68 ###
-
02.04.04.11 PINTURA ESMALTE m2 56.68 ###
-
02.04.04.12 TAPA SANITARIA METALICA DE 1/8" DE 0.60m x 0. und 13.00 ###
-
02.04.04.13 EQUIPAMIENTO PARA CAMARA ROMPE PRESION TIPOglb 13.00 ###
-
02.04.04.14 REBOSE DE CAMARA ROMPE PRESION TIPO VII glb 13.00 ###
-
02.04.05 VALVULAS DE AIRE (01 UND) -
02.04.05.01 EXCAVACION MANUAL EN TERRENO SEMI - ROCOSO m3 0.22 ###
-
02.04.05.02 CAJA DE CONCRETO ARAMADO FC=175kg/cm2 (0.4und 1.00 ###
-
02.04.05.03 ACCESORIOS PARA VALVULA DE AIRE EN LINEA DE 1und 1.00 ###
-
02.04.06 VALVULAS DE PURGA (08 UND) -
02.04.06.01 EXCAVACION MANUAL EN TERRENO SEMI - ROCOSO m3 3.04 ###
-
02.04.06.02 CAJA DE CONCRETO ARAMADO FC=175kg/cm2 (0.4und 8.00 ###
-
02.04.06.03 ACCESORIOS PARA VALVULA DE PURGA EN LINEA DEund 1.00 ###
-
02.04.06.04 ACCESORIOS PARA VALVULA DE PURGA EN LINEA D und 7.00 ###
-
02.04.07 VALVULAS DE CONTROL (10 UND) -
02.04.07.01 EXCAVACION MANUAL EN TERRENO SEMI - ROCOSO m3 3.80 ###
-
02.04.07.02 CAJA DE CONCRETO ARAMADO FC=175kg/cm2 (0.6und 10.00 ###
-
02.04.07.03 ACCESORIOS PARA VALVULA DE CONTROLEN LINEA und 5.00 ###
-
02.04.07.04 ACCESORIOS PARA VALVULA DE CONTROLEN LINEA und 5.00 ###
-
02.05 CONEXIONES DOMICILIARIAS DE AGUA POTABLE (38 UND) -
02.05.01 TRAZO Y NIVELACION Y REPLANTEO DE OBRAS LINIALm 570.00 ###
-
02.05.02 EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMm 570.00 ###
-
02.05.03 REFINE Y NIVELACION DE ZANJA PARA TUBERIAS m 570.00 ###
-
02.05.04 CAMA DE APOYO PARA TUBERIA EN ZANJA DE 0.50M. m 570.00 ###
-
02.05.05 RELLENO DE ZANJAS PARA TUB. DE 1/2" CON MATE m 570.00 ###
-
02.05.06 ACARREO DE MATERIAL EXCEDENTE HASTA D PROM m3 27.36 ###
-
02.05.07 SUMINISTRO E INSTALACION DE TUB. PVC @1/2" C-10m 570.00 ###
-
02.05.08 EQUIPAMIENTO PARA CONEXIONES DOMICILIARIA DE und 38.00 1.00
###
LOSA DE CONCRETO FC=175KG/CM2 E=10 CMS FROTACHADA
02.05.09 m2 38.00 ###
-
03 SANEAMIENTO BASICO -
03.01 UNIDAD BASICA DE SANEAMIENTO (38UND) -
03.01.01 CUARTO DE BAÑO -
03.01.01.01 MOVIMIENTO DE TIERRAS -
03.01.01.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 426.36 11.22
###
03.01.01.01.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 66.16 1.00
###
03.01.01.01.03 REFINE Y NIVELACION EN TERRENO NORMAL m2 327.94 4.63
###
03.01.01.01.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 7.30 ###
-
03.01.01.01.05 ACARREO DE MATERIAL EXCEDENTE HASTA D P m3 70.63 1.00
###
03.01.01.02 CONCRETO SIMPLE -
03.01.01.02.01 CONCRETO C.H 1:10+30% P.G EN CIMIENTOS CO m3 52.93 0.39
###
03.01.01.02.02 ENCOFRADO Y DESENCOFRADO m2 243.20 2.40
###
03.01.01.02.03 CONCRETO C.H 1:8 +25% P.M.EN SOBRECIMIENT m3 18.47 ###
-
03.01.01.02.04 VEREDA DE CONCRETO f'c=210 kg/cm2 E=0.15M m2 185.25 2.40
###
03.01.01.03 CONCRETO ARMADO -
03.01.01.03.01 LOSA DE APOYO -
03.01.01.03.01.0 ENCOFRADO Y DESENCOFRADO m2 61.56 1.58
###
03.01.01.03.01.0 ACERO fy=4200 Kg/cm2. kg 251.94 6.61
###
03.01.01.03.01.0 CONCRETO f'c=210 kg/cm2 m3 5.32 ###
-
03.01.01.03.02 VIGUETA DE CONFINAMIENTO -
03.01.01.03.02.0 ENCOFRADO Y DESENCOFRADO m2 65.36 1.72
###
03.01.01.03.02.0 ACERO fy=4200 Kg/cm2. kg 567.15 14.92
###
03.01.01.03.02.0 CONCRETO f'c=175 kg/cm2 m3 4.94 ###
-
03.01.01.03.03 COLUMNETAS -
03.01.01.03.03.0 ENCOFRADO Y DESENCOFRADO m2 136.23 3.59
###
03.01.01.03.03.0 ACERO fy=4200 Kg/cm2. kg 696.67 18.33
###
03.01.01.03.03.0 CONCRETO f'c=175 kg/cm2 m3 12.10 ###
-
OBRA:
"MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DE 103 CASERIOS ,
DISTRITO DE HUARMACA, HUANCABAMBA, PIURA. UP 070 CASERIO DE TOLINGAS ANEXO
DE SUCCHIRCA"
PRESUPUESTO AVANCE
SALDOMES
POR EJECTUTAR
PARTIDA DESCRIPCIÓN DICIEMBRE
Unid Metrado Metrado Metrado
03.01.01.04 COBERTURAS -
03.01.01.04.01 SUMINISTRO E INSTALACION DE VIGAS DE MADE und 152.00 4.00
###
03.01.01.04.02 SUMINISTRO E INSTALACION DE VIGAS DE MADE und 152.00 4.00
###
03.01.01.04.03 COBERTURA CON TEJA ANDINA m2 430.16 11.30
###
03.01.01.04.04 JUNTA DE TECKNOPOR m2 30.02 0.79
###
03.01.01.05 ARQUITECTURA Y ACABADOS -
03.01.01.05.01 MURO DE LADRILLO K.K.DE ARCILLA CARA VISTA m2 679.06 15.00
###
03.01.01.05.02 TARRAJEO INTERIOR (MORTERO 1:5, e=1,50cm) m2 201.78 4.00
###
03.01.01.05.03 PISO DE CONCRETO FC=140KG/CM2 ACABADO P m2 65.74 0.50
###
03.01.01.05.04 SARDINEL DE DE CONCRETO EN DUCHA 0.10X0. m 38.00 0.50
###
03.01.01.05.05 ZOCALO DE CEMENTO PULIDO MORTERO 1:4 m2 336.60 4.00
###
03.01.01.05.06 PUERTA DE MADERA CON MARCOS DE MADERA (0 und 38.00 11.00
###
03.01.02 LAVATORIO -
03.01.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 37.62 0.99
###
03.01.02.02 ENCOFRADO Y DESENCOFRADO m2 277.40 4.00
###
03.01.02.03 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 298.30 4.00
###
03.01.02.04 CONCRETO f'c=175 kg/cm2 m3 10.26 ###
-
03.01.02.05 TARRAJEO INTERIO (MORTERO 1:5, e=1,50cm) m2 201.78 3.00
###
03.01.02.06 SUMINISTRO E INSTALACION DE ACCESORIO EN L und 38.00 10.00
###
03.01.03 INSTALACIONES SANITARIAS -
03.01.03.01 TRAZO Y REPLANTEO PRELIMINAR m2 232.45 6.11
###
03.01.03.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 59.74 1.56
###
03.01.03.03 CAMA DE ARENA h=0.10 m2 663.86 17.46
###
03.01.03.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 181.83 4.77
###
03.01.03.05 ACARREO DE MATERIAL EXCEDENTE HASTA D PR m3 23.17 0.60
###
03.01.03.06 SUMINISTRO E INSTALACION DE TUB. PVC @1/2" C-m 836.76 22.02
###
03.01.03.07 SUMINISTRO E INSTALACION DE TUB. PVC @ 2" C-1 m 245.48 6.91
###
03.01.03.08 SUMINISTRO E INSTALACION DE ACCESORIO DE A glb 38.00 9.22
###
03.01.03.09 SUMINISTRO E INSTALACION DE ACCESORIO -DES glb 38.00 9.23
###
03.01.03.10 PRUEBA HIDRAULICA Y DESINFECCION EN REDES D m 836.76 836.76
###
03.01.03.11 PRUEBA HIDRAULICA EN REDES DE DESAGUE m 245.48 245.48
###
03.01.03.12 CAJA DE REGISTRO 12"x24" CON MARCO Y TAPA DE und 38.00 1.00
###
03.01.03.13 TAPA METALICA PARA COMPOSTERA und 76.00 2.00
###
03.01.04 POZO DE PERCOLACION -
03.01.04.01 TRAZO Y REPLANTEO PRELIMINAR m2 76.38 2.01
###
03.01.04.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 145.16 3.81
###
03.01.04.03 ACARREO DE MATERIAL EXCEDENTE HASTA D PR m3 174.42 4.59
###
03.01.04.04 CONCRETO C.H 1:8 +25% P.M.EN SOBRECIMIENTOS m3 4.18 0.12
###
03.01.04.05 MURO DE LADRILLO K.K.DE ARCILLA APAREJO DE m2 190.76 5.01
###
03.01.04.06 ENCOFRADO Y DESENCOFRADO m2 90.06 2.37
###
03.01.04.07 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 281.58 7.41
###
03.01.04.08 CONCRETO f'c=175 kg/cm2 m3 7.60 0.20
###
03.01.04.09 FILTRO DE GRAVA 1 1/2,2 Y 21/2" m3 58.90 1.55
###
03.01.04.10 TAPA DE CONCRETO D=0.60m und 38.00 1.00
###
03.01.04.11 PRUEBA DE CALIDAD DEL CONCRETO und 190.00 155.00
###
04 MITIGACION AMBIENTAL -
04.01 MANEJO DE RESIDUOS SOLIDOS -
04.01.01 IMPLEMENTACION DE DEPOSITOS RECOLECTORES DE und 10.00 ###
-
04.01.02 MANEJO DE RESIDUOS DE OBRA DURANTE LA EJECUC mes 3.00 ###
-
04.02 MITIGACION,PREVENCION Y CONTROL -
04.02.01 RIEGO Y HUMEDECIMIENTO km 2.75 -
04.02.02 REPOSICION DE COBERTURA VEGETAL m2 740.05 ###
-
04.03 SEGUIMIENTO Y CONTROL -
04.03.01 MONITOREO DE AGUA Y RUIDO glb 1.00 ###
-
04.04 MANEJO DE CONTINGENCIAS Y PARTICIPACION CIUDADANA -
04.04.01 IMPLEMENTACION DE KIT ANTIDERRAME glb 1.00 ###
-
04.04.02 CAPACITACION Y SIMULACROS AMBIENTALES mes 3.00 ###
-
04.04.03 CIERRE Y ABANDONO DE OBRA glb 1.00 ###
-
04.04.04 PRESENTACION DE INFORMES AL MVCS und 3.00 ###
-
05 PLAN DE MONITOREO ARQUEOLOGICO -
05.01 IMPLEMENTACION DE PLAN DE MONITOREO -
05.01.01 IMPLEMENTACION DE PLAN DE MONITOREO ARQUEO mes 3.00 ###
-
05.02 MATERIALES Y MOVILIDAD -
05.02.01 MATERIAL DE CAMPO PARA MONITOREO ARQUEOLOG mes 3.00 ###
-
05.02.02 UTILES DE OFICINA mes 3.00 ###
-
05.03 PAGOS AL MINISTERIO DE CULTURA -
05.03.01 PRESENTACION Y PROBACION DEL PLAN DE MONITO und 1.00 ###
-
05.03.02 APROBACION DEL INFORME FINAL und 1.00 1.00
###
06 FLETES -
06.01 FLETE TERRESTRE glb 1.00 ###
-
06.02 FLETE RURAL glb 1.00 ###
-