MONTOS TOTALES

VAL N° PERIODO MES PARCIAL ACUMUL.


S/. S/.
0 INICIO 14-Jan-24 S - S -
1 14/01/2024 AL 31/01/2024 31-Jan-24 S/43,738.98 S/43,738.98
2 01/02/2024 AL 29/02/2024 29-Feb-24 S/119,784.63 163,523.61
3 01/03/2024 AL 31/03/2024 31-Mar-24 S/286,534.43 450,058.04
4 01/04/2024 AL 30/04/2024 30-Apr-24 S/365,901.90 815,959.94
5 01/05/2024 AL 12/05/2024 12-May-24 S/84,969.32 900,929.26
TOTAL S/900,929.26

43,695.07 43,695.07
119,823.59 163,518.66
286,495.50 450,014.16
365,957.47 815,971.63
84,957.63 900,929.26
PORCENTAJES
PARCIAL ACUMUL.
% % 36,443.10 36,443.10 4.05%
0.00% 0.00% 88,386.02 124,829.12 9.81%
4.86% 4.86% 266,542.88 391,372.00 29.59%
13.30% 18.16% 370,314.10 761,686.10 41.10%
31.80% 49.96% 139,243.16 900,929.26 15.46%
40.61% 90.57%
9.43% 100.00% S/900,929.26
100.00%

4.85
13.3
4.85% 31.8
13.30% 40.61
31.80% 9.44
40.62% 100
9.43%
100.00%
4.05%
13.86%
43.44%
84.54%
100.00%
USOS MULTIPLES ACORIA

OBRA: “CREACIÓN DEL SERVICIO DE INFRAESTRUCTURA DE USOS MÚLTIPLES DE LA MUNICIPALIDAD DIST


PROVINCIA HUANCAVELICA – DEPARTAMENTO HUANCAVELICA” CON C
CONTROL DE VALORIZACIONES PROGRAMADAS VS EJECUTAD
VALORIZACIONES DE OBRA PROGRAMADAS (S/.) VALORIZACIONES DE OBRA EJE
MES PARCIAL ACUMUL.
PARCIAL ACUMULADO PARCIAL
% %
Aug-23 S/59,960.83 S/59,960.83 14.21% 14.21% S/ 68,197.14
Sep-23 S/100,793.41 S/160,754.24 23.89% 38.10% S/ 85,794.31
Oct-23 S/ 66,981.25 S/227,735.49 15.87% 53.97% S/ 71,020.79
Nov-23 S/61,535.91 S/289,271.40 14.59% 68.56% S/ 109,683.37
Dec-23 S/132,657.07 S/421,928.47 31.44% 100.00% S/ 85,502.88
S/421,928.47 100.00%

SANEAMIENTO DE CCOTA

OBRA: “CREACIÓN DE SERVICIO DEL AGUA POTABLE Y SANEAMIENTO BÁSICO EN LA LOCALIDAD DE SAN
PROVINCIA DE HUANCAVELICA – DEPARTAMENTO DE HUANCAVELICA” CO
CONTROL DE VALORIZACIONES PROGRAMADAS VS EJECUTAD
VALORIZACIONES DE OBRA PROGRAMADAS (S/.) VALORIZACIONES DE OBRA EJE
MES PARCIAL ACUMUL.
PARCIAL ACUMULADO PARCIAL
% %
Inicio S/0.00 S/0.00 0.00% 0.00%
Jan-24 S/35,734.02 S/35,734.02 3.24% 3.24% S/ 29,324.69
Feb-24 S/262,734.95 S/298,468.97 23.84% 27.08%
Mar-24 S/303,520.61 S/601,989.58 27.54% 54.61%
Apr-24 S/364,668.89 S/966,658.47 33.08% 87.69%
May-24 S/135,638.95 S/1,102,297.42 12.31% 100.00%
S/1,102,297.42 100.00%

PARQUE CHUPACA

OBRA: “CREACIÓN DEL PARQUE EN EL CENTRO POBLADO DE CHUPACA DEL DISTRITO DE ACORIA – PROVIN
HUANCAVELICA” CON CUI 2192211
CONTROL DE VALORIZACIONES PROGRAMADAS VS EJECUTAD
VALORIZACIONES DE OBRA PROGRAMADAS (S/.) VALORIZACIONES DE OBRA EJE
MES PARCIAL ACUMUL.
PARCIAL ACUMULADO PARCIAL
% %
Inicio S/0.00 S/0.00 0.00% 0.00%
Jan-24 S/23,031.83 S/23,031.83 6.21% 6.21% S/ 57,971.03
Feb-24 S/261,161.22 S/284,193.05 70.41% 76.62%
Mar-24 S/86,745.00 S/370,938.05 23.38% 100.00%
S/370,938.05 100.00%
NARANJAL

OBRA: “MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO BÁSICO EN LA COMUNIDAD


ACORIA – PROVINCIA DE HUANCAVELICA – DEPARTAMENTO DE HUANCAVELICA
CONTROL DE VALORIZACIONES PROGRAMADAS VS EJECUTAD
VALORIZACIONES DE OBRA PROGRAMADAS (S/.) VALORIZACIONES DE OBRA EJE
MES PARCIAL ACUMUL.
PARCIAL ACUMULADO PARCIAL
% %
Inicio S/0.00 S/0.00 0.00% 0.00%
19 al 23 de enero del
S/16,090.06 S/16,090.06 3.04% 3.04% S/ 17,781.82
2024
24 al 31 de enero del S/77,655.36 S/93,745.42 14.70% 17.74%
2024
01 al 29 de febrero S/320,353.22 S/414,098.64 60.61% 78.35%
del 2024
01 al 18 de febrero S/114,444.84 S/528,543.48 21.65% 100.00%
del 2024
S/528,543.48 100.00%
LES DE LA MUNICIPALIDAD DISTRITAL DE ACORIA DEL DISTRITO DE ACORIA –
MENTO HUANCAVELICA” CON CUI N° 2555735
S PROGRAMADAS VS EJECUTADAS
VALORIZACIONES DE OBRA EJECUTADAS (S/.)
SITUACION DE LA OBRA
PARCIAL ACUMUL.
ACUMULADO
% % CONDICION VARIACION
S/68,197.14 16.16% 16.16% ADELANTADO 1.95%
S/153,991.45 20.33% 36.49% RETRASADO -1.61%
S/225,012.24 16.83% 53.32% RETRASADO -0.65%
S/334,695.61 26.00% 79.32% ADELANTADO 10.76%
S/420,198.49 20.26% 99.58% TERMINADO -0.42%

SICO EN LA LOCALIDAD DE SANTIAGO DE CCOTA DEL DISTRITO DE ACORIA –


MENTO DE HUANCAVELICA” CON CUI N° 2537601
S PROGRAMADAS VS EJECUTADAS
VALORIZACIONES DE OBRA EJECUTADAS (S/.)
SITUACION DE LA OBRA
PARCIAL ACUMUL.
ACUMULADO
% % CONDICION VARIACION

S/29,324.69 2.66% 2.66% ATRASADO -0.58%

L DISTRITO DE ACORIA – PROVINCIA DE HUANCAVELICA – DEPARTAMENTO DE


A” CON CUI 2192211
S PROGRAMADAS VS EJECUTADAS
VALORIZACIONES DE OBRA EJECUTADAS (S/.)
SITUACION DE LA OBRA
PARCIAL ACUMUL.
ACUMULADO
% % CONDICION VARIACION

S/57,971.03 15.63% 15.63% ADELANTADO 9.42%


TO BÁSICO EN LA COMUNIDAD CAMPESINA DE NARANJAL DEL DISTRITO DE
RTAMENTO DE HUANCAVELICA” CON CUI N° 2446301
S PROGRAMADAS VS EJECUTADAS
VALORIZACIONES DE OBRA EJECUTADAS (S/.)
SITUACION DE LA OBRA
PARCIAL ACUMUL.
ACUMULADO
% % CONDICION VARIACION

S/17,781.82 3.36% 3.36% ADELANTADO 0.32%


GG 10.4418057%
U 7.94078%
IGV 18.00%
USOS MULTIPLES ACORIA

VALORIZACION N° 04 CORRESPONDIENTE AL MES DE DICIEMBRE DEL 2023


CONCEPTO PRESUPUESTO ANTERIOR ACTUAL
COSTO DIRECTO S/302,043.16 S/239,596.36 S/61,208.39
GASTOS GENERALES (10.44%) S/31,538.76 S/25,018.19 S/6,391.26
UTILIDAD (7.94078%) S/23,984.58 S/19,025.80 S/4,860.42
SUB TOTAL S/357,566.50 S/283,640.35 S/72,460.07
IGV (18%) S/64,361.97 S/51,055.26 S/13,042.81
TOTAL DE PRESUPUESTO S/421,928.47 S/334,695.61 S/85,502.88
TOTAL 100% 79.32% 20.26%

SANEAMIENTO DE CCOTA

VALORIZACION N° 01 CORRESPONDIENTE AL MES DE ENERO DEL 2024


CONCEPTO PRESUPUESTO ANTERIOR ACTUAL
COSTO DIRECTO S/859,234.16 S/0.00 S/ 22,858.42
GASTOS GENERALES (3.72%) S/31,954.49 S/0.00 S/ 850.09
UTILIDAD (5.00%) S/42,961.71 S/0.00 S/ 1,142.92
SUB TOTAL S/934,150.36 S/0.00 S/24,851.43
IGV (18%) S/168,147.06 S/0.00 S/ 4,473.26
TOTAL DE PRESUPUESTO S/1,102,297.42 S/0.00 S/29,324.69
TOTAL 100% 0.00% 2.66%

PARQUE CHUPACA

VALORIZACION N° 01 CORRESPONDIENTE AL MES DE ENERO DEL 2024


CONCEPTO PRESUPUESTO ANTERIOR ACTUAL
COSTO DIRECTO S/264,486.28 S/0.00 S/ 41,334.51
GASTOS GENERALES (11.86%) S/31,368.00 S/0.00 S/ 4,902.26
UTILIDAD (6.99%) S/18,500.00 S/0.00 S/ 2,891.22
SUB TOTAL S/314,354.28 S/0.00 S/49,127.99
IGV (18%) S/56,583.77 S/0.00 S/ 8,843.04
TOTAL DE PRESUPUESTO S/370,938.05 S/0.00 S/57,971.03
TOTAL 100% 0.00% 15.63%
NARANJAL

VALORIZACION N° 01 CORRESPONDIENTE AL MES DE ENERO DEL 2024


CONCEPTO PRESUPUESTO ANTERIOR ACTUAL
COSTO DIRECTO S/393,043.42 S/0.00 S/ 13,223.19
GASTOS GENERALES (6.96%) S/27,361.74 S/0.00 S/ 920.53
UTILIDAD (7.00%) S/27,513.04 S/0.00 S/ 925.62
SUB TOTAL S/447,918.20 S/0.00 S/15,069.34
IGV (18%) S/80,625.28 S/0.00 S/ 2,712.48
TOTAL DE PRESUPUESTO S/528,543.48 S/0.00 S/17,781.82
TOTAL 100% 0.00% 3.36%
CIEMBRE DEL 2023
ACUMULADO SALDO
S/300,804.75 S/1,238.41
S/31,409.45 S/129.31
S/23,886.22 S/98.36
S/356,100.42 S/1,466.08
S/64,098.07 S/263.90
S/420,198.49 S/1,729.98
99.58% 0.42%

NERO DEL 2024


ACUMULADO SALDO
S/22,858.42 S/836,375.74
S/850.09 S/31,104.40
S/1,142.92 S/41,818.79
S/24,851.43 S/909,298.93
S/4,473.26 S/163,673.80
S/29,324.69 S/1,072,972.73
2.66% 97.34%

NERO DEL 2024


ACUMULADO SALDO
S/41,334.51 S/223,151.77
S/4,902.26 S/26,465.74
S/2,891.22 S/15,608.78
S/49,127.99 S/265,226.29
S/8,843.04 S/47,740.73
S/57,971.03 S/312,967.02
15.63% 84.37%
NERO DEL 2024
ACUMULADO SALDO
S/13,223.19 S/379,820.23
S/920.53 S/26,441.21
S/925.62 S/26,587.42
S/15,069.34 S/432,848.86
S/2,712.48 S/77,912.80
S/17,781.82 S/510,761.66
3.36% 96.64%
USOS MULTIPLES ACORIA

MONTO TOTAL
N° DESCRIPCIÓN
VALORIZADO
1 VALORIZACION N° 05 DEL MES DICIEMBRE DEL 2023 S/ 85,502.88
2 MONTO A FACTURAR S/ 85,502.88
RETENCION DE GARANTIA DE FIEL CUMPLIMIENTO 10%
3 DEL MONTO DE CONTRATO (Articulo N° 149 de RLCE) S/ 0.00
(RETENIDO AL 100%)
4 PENALIDAD (NO TIENE ) S/ 0.00
5 MONTO TOTAL A PAGAR AL CONTTRATISTA S/ 85,502.88

SANEAMIENTO DE CCOTA

MONTO TOTAL
N° DESCRIPCIÓN
VALORIZADO
1 VALORIZACION N° 01 DEL MES ENERO DEL 2024 S/29,324.69
2 AMORTIZACIÓN POR ADELANTO DIRECTO 10% S/0.00
3 AMORTIZACIÓN POR ADELANTO DE MATERIALES S/0.00
4 MONTO A FACTURAR S/29,324.69
RETENCION DE GARANTIA DE FIEL CUMPLIMIENTO 10%
5 DEL MONTO DE CONTRATO (Articulo N° 149 de RLCE) S/22,045.95
(Retenido al 2%)
6 PENALIDAD (NO TIENE ) S/ 0.00
7 MONTO TOTAL A PAGAR AL CONTTRATISTA S/ 7,278.74

MONTO TOTAL
N° DESCRIPCIÓN
VALORIZADO
1 VALORIZACION N° 01 DEL MES ENERO DEL 2024 144247.08
2 AMORTIZACIÓN POR ADELANTO DIRECTO 10% 58995.41
3 AMORTIZACIÓN POR ADELANTO DE MATERIALES 48801
4 MONTO A FACTURAR 36,450.67
RETENCION DE GARANTIA DE FIEL CUMPLIMIENTO 10%
5 S/0.00
DEL MONTO DEL CONTRATO (Articulo N° 149 de RLCE)
SE TIENE UN DESCUENTO DE LA VIGA PRINCIPAL DEL
6 1,343.97
EJE C-C, COMO SE MUESTRA EN EL CUADRO N° 10
7 PENALIDAD (NO TIENE) S/ 0.00
8 MONTO TOTAL A PAGAR AL CONTTRATISTA 35,106.70

PARQUE CHUPACA

MONTO TOTAL
N° DESCRIPCIÓN
VALORIZADO
1 VALORIZACION N° 01 DEL MES ENERO DEL 2024 S/57,971.03
2 CALCULO DE REAJUSTE S/521.74
3 AMORTIZACIÓN POR ADELANTO DIRECTO 10% S/0.00
4 AMORTIZACIÓN POR ADELANTO DE MATERIALES S/0.00
5 MONTO A FACTURAR S/58,492.77
RETENCION DE GARANTIA DE FIEL CUMPLIMIENTO 10%
6 S/18,546.90
DEL MONTO DE CONTRATO (Articulo N° 149 de RLCE)
7 PENALIDAD (NO TIENE ) S/0.00
8 MONTO TOTAL A PAGAR AL CONTRATISTA 39,945.87

NARANJAL

MONTO TOTAL
N° DESCRIPCIÓN
VALORIZADO
1 VALORIZACION N° 01 DEL MES ENERO DEL 2024 S/17,781.82
2 CALCULO DE REAJUSTE (NO TIENE ) S/0.00
3 AMORTIZACIÓN POR ADELANTO DIRECTO 10% (NO TIENE ) S/0.00
AMORTIZACIÓN POR ADELANTO DE MATERIALES (NO
4 S/0.00
TIENE)
5 MONTO A FACTURAR S/17,781.82
RETENCION DE GARANTIA DE FIEL CUMPLIMIENTO 10%
6 DEL MONTO DE CONTRATO (Articulo N° 149 de RLCE) S/17,781.82
(RETENIDO AL 33.64%)
7 PENALIDAD (NO TIENE ) S/ 0.00
8 MONTO TOTAL A PAGAR AL CONTTRATISTA S/ 0.00
36,450.67
35,106.7
SANEAMIENTO DE CCOTA

RETENCIÓN POR FIEL CUMPLIMIENTO DE 10%


MONTO DEL
MES
CONTRATO
Jan-24 S/ 110,229.74
TOTAL AMORTIZADO 26.60%

PARQUE CHUPACA

RETENCIÓN POR FIEL CUMPLIMIENTO DE 10%


MONTO DEL
MES
CONTRATO
Jan-24 S/ 37,093.81

TOTAL AMORTIZADO 50.00%

CALCULO DE REAJUSTE

MONTO
MES
VALORIZADO N° 01

Jan-24 S/ 49,127.99
CON IGV 18%
TOTAL REAJUSTE

NARANJAL

RETENCIÓN POR FIEL CUMPLIMIENTO DE 10%


MONTO DEL
MES
CONTRATO
19 al 23 de enero del 2024 S/ 52,854.35

TOTAL AMORTIZADO 33.64%


N POR FIEL CUMPLIMIENTO DE 10%

RETENCION DE FIEL CUMPLIMIENTO SALDO

S/ 29,324.69 S/80,905.05
26.60% 73.40%

N POR FIEL CUMPLIMIENTO DE 10%

RETENCION DE FIEL CUMPLIMIENTO SALDO

S/ 18,546.90 S/18,546.91

50.00% 50.00%

CALCULO DE REAJUSTE
REINTEGRO
BRUTO
K
AUTORIZAD
O
1.009 S/442.15
ON IGV 18% S/79.59
TAL REAJUSTE S/521.74

N POR FIEL CUMPLIMIENTO DE 10%

RETENCION DE FIEL CUMPLIMIENTO SALDO

S/ 17,781.82 S/35,072.53

33.64% 66.36%