EXPEDIENTE DE MANTENIMIENTO
3.1.
HOJA DE PRESUPUESTO
C.P.O.C.
MANTENIMIENTO
Item Descripción UM Metrado Costo Costo
Sub Total
Unitario Parcial
01.00 MANTENIMIENTO DE TECHOS 7,458.14
01.01 REPOSICIÓN DE COBERTURA DE ALUZINC PRE-PINTADA M² 172.89 37.35 6,457.44
01.02 REPOSICIÓN DE CUMBRERA ML 15.66 25.95 406.38
01.03 ACONDICIONAMIENTO DE TIMPANOS CON MALLA METÁLICA M² 20.16 29.48 594.32
02.00 MANTENIMIENTO DE MUROS 6,491.86
02.01 ACONDICIONAMIENTO DE ENLUCIDOS EN MUROS DE LADRILLO CON M² 92.49 27.49 2,542.55
CEMENTO-ARENA
ACONDICIONAMIENTO DE ENLUCIDO EN DERRAME DE VANOS CON ML
02.02 114.84 25.55 2,934.16
CEMENTO-ARENA
02.03 ACONDICIONAMIENTO DE MURO CONTRAPLACADO CON M² 13.31 76.27 1,015.15
FIBROCEMENTO AMBOS LADOS INC. ESTRUCTURA
03.00 MANTENIMIENTO DE VANOS, PUERTAS Y VENTANAS 6,219.19
03.01 ACONDICIONAMIENTO DE VENTANA DE MARCO Y BASTIDORES DE M² 57.99 77.54 4,496.54
MADERAI, INC. MALLA METÁLICA
03.02 ACONDICIONAMIENTO DE PUERTA DE MADERA CONTRAPLACADA DEUND 1.00 638.69 638.69
UNA HOJA CON TRAGALUZ, INC. CERRADURA Y ACCESORIOS
03.03 ACONDICIONAMIENTO DE PUERTA DE MADERA CONTRAPLACADA UND 1.00 1,083.96 1,083.96
DOBLE HOJA CON TRAGALUZ, INC. CERRADURA Y ACCESORIOS
04.00 MANTENIMIENTO DE PINTURAS 1,811.35
04.01 MANTENIMIENTO CON PINTURA LATEX EN INTERIORES Y M² 136.63 11.05 1,509.76
EXTERIORES INC.CON
MANTENIMIENTO BASEPINTURA ESMALTE EN CONTRAZOCALOS INC. M²
04.02 24.66 12.23 301.59
BASE
05.00 MANTENIMIENTO DEL SISTEMA ELECTRICO 4,688.20
05.01 REPOSICIÓN DE CENTRO DE LUZ TECHO INC. LUMINARIA Y PTO 9.00 57.85 520.65
ACCESORIOS PTO
05.02 REPOSICIÓN DE INTERRUPTOR SIMPLE 1.00 32.62 32.62
05.03 REPOSICIÓN DE INTERRUPTOR DOBLE PTO 2.00 41.32 82.64
05.04 PICADO Y RESANE DE MURO Y PISO PARA EMPOTRADO DE TUBERÍA ML 105.10 2.82 296.38
PARA TOMACORRIENTE
05.05 REPOSICIÓN DE TOMACORRIENTE DOBLE PTO 5.00 35.22 176.10
05.06 REPOSICIÓN DE CABLEADO CONDUCTOR TW #14 INC. TUBERÍA (LIZA/ML 97.40 14.72 1,433.73
CORRUGADA) Y ACCESORIOS
05.07 REPOSICIÓN DE CABLEADO CONDUCTOR TW #12 INC. TUBERÍA (LIZA/ML 105.10 16.85 1,770.94
CORRUGADA) Y ACCESORIOS
05.08 ACONDICIONAMIENTO DE TABLERO GAB. PVC P/DISTRIBUCIÓN UND 1.00 375.14 375.14
ELECTRICA P/3 LLAVES INC. ACCESORIOS
COSTO DIRECTO S/ 26,668.74
Son: VEINTE Y SEIS MIL SEISCIENTOS SESENTA Y OCHO
CON 74/100 Soles
Pag. 1 de 1
OFICINA ZONAL TINGO MARÍA
EXPEDIENTE DE MANTENIMIENTO
3.2.
PRESUPUESTO DESAGREGADO
C.P.O.C.
PRESUPUESTO DESAGREGADO
Proyecto ACONDICIONAMIENTO, MANTENIMIENTO Y REPARACIÓN DE LA INFRAESTRUCTURA DEL
LOCAL COMUNAL DEL CASERÍO JOSÉ CARLOS MARIATEGUI, DISTRITO DE SANTO DOMINGO
DE ANDA, PROVINCIA DE LEONCIO PRADO, DEPARTAMENTO DE HUÁNUCO
Propietario DEVIDA
Departamento HUANUCO Provincia LEONCIO PRADO
Distrito RUPA-RUPA Lugar Tingo María
Hecho por ARQ DIAZ SANCHEZ, CECILIA ::: ARQUITECTA
Revisado por ARQ DIAZ SANCHEZ, CECILIA ::: ARQUITECTA
Fecha viernes, 26 de mayo de 2023
MANTENIMIENTO
Item Descripción UM Mano de Equipo y
Material Comodín Otros
Obra herram.
Pag. 1 de 1
OFICINA ZONAL TINGO MARÍA
EXPEDIENTE DE MANTENIMIENTO
3.3.
ANÁLISIS DE COSTOS UNITARIOS
C.P.O.C.
MANTENIMIENTO
Materiales
CLAVOS C/C 1" KG 0.0200 10.40 0.21
MALLA METALICA CON PVC DE 1/4" M² 1.1000 15.60 17.16
17.37
Equipos/Maquinarias
ANDAMIOS METALICOS H-M 1.0000 0.2667 12.00 3.20
3.20
Comodines
HERRAMIENTAS MANUALES % 5.0000 8.49 0.42
0.42
02.03 Partida ACONDICIONAMIENTO DE MURO CONTRAPLACADO CON FIBROCEMENTO AMBOS LADOS INC. ESTRUCTURA
Especificación
Rendimiento 8.00 Jornada 8.00 UM. M²
Mano de obra Materiales Equipo/Herr Comodines Otros Subanálisis Costo unitario
37.20 37.21 1.86 76.27
Denominación U.M. Rqto Cantidad Precio Parcial
Mano de obra
OFICIAL H-H 1.0000 1.0000 14.65 14.65
OPERARIO H-H 1.0000 1.0000 18.57 18.57
PEON H-H 0.3000 0.3000 13.28 3.98
37.20
Materiales
CINTA P/JUNTA F/VID. 52MM.X91MT.(ROLLO) UND 0.0100 11.70 0.12
PASTA P/JUNTA HAMILTON S 4.5GLN.(BALDE) UND 0.1000 55.80 5.58
PLANCHA DE FIBROCEMENTO MULTIPLACA 1.22 X 2.44 X 4MM. UND 0.7054 43.40 30.61
TORNILLO GYPLAC 6X32MM.(MILLAR) CIEN 0.0370 11.10 0.41
TORNILLO WAFER (P.BROCA) 8X13MM.(MILLAR) CIEN 0.0050 98.00 0.49
37.21
Comodines
HERRAMIENTAS MANUALES % 5.0000 37.20 1.86
1.86
Pag. 2 de 6
MANTENIMIENTO
03.01 Partida ACONDICIONAMIENTO DE VENTANA DE MARCO Y BASTIDORES DE MADERAI, INC. MALLA METÁLICA
Especificación
Rendimiento 25.00 Jornada 8.00 UM. M²
Mano de obra Materiales Equipo/Herr Comodines Otros Subanálisis Costo unitario
10.19 66.84 0.51 77.54
Denominación U.M. Rqto Cantidad Precio Parcial
Mano de obra
OPERARIO H-H 1.0000 0.3200 18.57 5.94
PEON H-H 1.0000 0.3200 13.28 4.25
10.19
Materiales
CLAVOS PARA MADERA C/C 1/2" KG 0.0500 13.00 0.65
LACA PROTECTORA GLN 0.0100 24.30 0.24
LISTON DE MADERA 1"x2"x10' P² 1.0500 11.70 12.29
LISTON DE MADERA 2"x2"x10' P² 2.1000 16.90 35.49
MALLA METALICA CON PVC DE 1/4" M² 1.1500 15.60 17.94
THINER GLN 0.0100 23.00 0.23
66.84
Comodines
HERRAMIENTAS MANUALES % 5.0000 10.19 0.51
0.51
03.02 Partida ACONDICIONAMIENTO DE PUERTA DE MADERA CONTRAPLACADA DE UNA HOJA CON TRAGALUZ, INC.
CERRADURA Y ACCESORIOS
Especificación
Rendimiento 1.00 Jornada 8.00 UM. UND
Mano de obra Materiales Equipo/Herr Comodines Otros Subanálisis Costo unitario
201.68 426.93 10.08 638.69
Denominación U.M. Rqto Cantidad Precio Parcial
Mano de obra
OPERARIO H-H 1.0000 8.0000 18.57 148.56
PEON H-H 0.5000 4.0000 13.28 53.12
201.68
Materiales
BISAGRA CAPUCHINA DE 3" X 3" UND 3.0000 9.10 27.30
CHAPA DE TRES GOLPES UND 1.0000 89.10 89.10
LACA SELLADORA GLN 0.2500 91.50 22.88
LIJA DE MADERA PLG 2.0000 2.60 5.20
LISTON DE MADERA 2"x2"x10' P² 8.2780 16.90 139.90
THINER GLN 0.2500 23.00 5.75
TRIPLAY de 1.20m x 2.40m x 4 MM. UND 2.0000 68.40 136.80
426.93
Comodines
HERRAMIENTAS MANUALES % 5.0000 201.68 10.08
10.08
03.03 Partida ACONDICIONAMIENTO DE PUERTA DE MADERA CONTRAPLACADA DOBLE HOJA CON TRAGALUZ, INC.
CERRADURA Y ACCESORIOS
Especificación
Rendimiento 1.00 Jornada 8.00 UM. UND
Mano de obra Materiales Equipo/Herr Comodines Otros Subanálisis Costo unitario
350.24 716.21 17.51 1,083.96
Denominación U.M. Rqto Cantidad Precio Parcial
Mano de obra
OPERARIO H-H 2.0000 16.0000 18.57 297.12
PEON H-H 0.5000 4.0000 13.28 53.12
350.24
Materiales
BISAGRA CAPUCHINA DE 3" X 3" UND 6.0000 9.10 54.60
CHAPA DE TRES GOLPES UND 1.0000 89.10 89.10
LACA SELLADORA GLN 0.5000 91.50 45.75
LIJA DE MADERA PLG 5.0000 2.60 13.00
LISTON DE MADERA 2"x2"x10' P² 13.5300 16.90 228.66
THINER GLN 0.5000 23.00 11.50
TRIPLAY de 1.20m x 2.40m x 4 MM. UND 4.0000 68.40 273.60
716.21
Comodines
HERRAMIENTAS MANUALES % 5.0000 350.24 17.51
17.51
Pag. 3 de 6
MANTENIMIENTO
04.01 Partida MANTENIMIENTO CON PINTURA LATEX EN INTERIORES Y EXTERIORES INC. BASE
Especificación
Rendimiento 40.00 Jornada 8.00 UM. M²
Mano de obra Materiales Equipo/Herr Comodines Otros Subanálisis Costo unitario
5.04 5.76 0.25 11.05
Denominación U.M. Rqto Cantidad Precio Parcial
Mano de obra
OPERARIO H-H 1.0000 0.2000 18.57 3.71
PEON H-H 0.5000 0.1000 13.28 1.33
5.04
Materiales
BROCHA DE 3" UND 0.0150 7.80 0.12
LIJA DE FIERRO Nø 80 PLG 0.0200 2.60 0.05
PINTURA IMPRIMANTE BOL 0.0500 37.80 1.89
PINTURA LATEX GLN 0.0500 45.90 2.30
RODILLO DE 12" PARA PINTAR UND 0.0150 23.00 0.35
TEMPLE BLANCO KG 0.0260 40.30 1.05
5.76
Comodines
HERRAMIENTAS MANUALES % 5.0000 5.04 0.25
0.25
Pag. 4 de 6
MANTENIMIENTO
Mano de obra
OPERARIO H-H 1.0000 0.6667 18.57 12.38
PEON H-H 0.2500 0.1667 13.28 2.21
14.59
Materiales
CAJA RECTANGULAR GALV. 4"*2 1/8" UND 1.0000 1.70 1.70
INTERRUPTOR SIMPLE PZA 1.0000 15.60 15.60
17.30
Comodines
HERRAMIENTAS MANUALES % 5.0000 14.59 0.73
0.73
05.04 Partida PICADO Y RESANE DE MURO Y PISO PARA EMPOTRADO DE TUBERÍA PARA TOMACORRIENTE
Especificación
Rendimiento 25.00 Jornada 8.00 UM. ML
Mano de obra Materiales Equipo/Herr Comodines Otros Subanálisis Costo unitario
2.12 0.59 0.11 2.82
Denominación U.M. Rqto Cantidad Precio Parcial
Mano de obra
PEON H-H 0.5000 0.1600 13.28 2.12
2.12
Materiales
AGUA M3 0.0020 6.50 0.01
ARENA FINA M3 0.0010 138.00 0.14
CEMENTO PORTLAND TIPO I BLS 0.0100 36.50 0.37
YESO DE 18 KG. BLS 0.0050 13.00 0.07
0.59
Comodines
HERRAMIENTAS MANUALES % 5.0000 2.12 0.11
0.11
Pag. 5 de 6
MANTENIMIENTO
05.06 Partida REPOSICIÓN DE CABLEADO CONDUCTOR TW #14 INC. TUBERÍA (LIZA/CORRUGADA) Y ACCESORIOS
Especificación
Rendimiento 100.00 Jornada 8.00 UM. ML
Mano de obra Materiales Equipo/Herr Comodines Otros Subanálisis Costo unitario
2.02 12.60 0.10 14.72
Denominación U.M. Rqto Cantidad Precio Parcial
Mano de obra
OPERARIO H-H 1.0000 0.0800 18.57 1.49
PEON H-H 0.5000 0.0400 13.28 0.53
2.02
Materiales
ABRAZADERA DE 3/4" CON 2 OREJAS DE 2mm UND 0.3000 9.10 2.73
CABLE TW 2.5 MM2 O 14 AWG ML 2.1000 2.30 4.83
CINTA AISLANTE ELECTRICA PZA 0.0050 7.80 0.04
CURVA PVC ELECTRICA SEL 3/4" PZA 0.5000 1.00 0.50
TORNILLO DE FIJACIÒN 1" MIL 0.0100 91.50 0.92
TUBERIA PVC SEL ELECTRICA 3MLX 0 3/4 UND 0.3500 8.50 2.98
TUBERIA PVC SEL ELECTRICA FLEXIBLE CORRUGADA 3ML X 0 3/4" UND 0.3000 2.00 0.60
12.60
Comodines
HERRAMIENTAS MANUALES % 5.0000 2.02 0.10
0.10
05.07 Partida REPOSICIÓN DE CABLEADO CONDUCTOR TW #12 INC. TUBERÍA (LIZA/CORRUGADA) Y ACCESORIOS
Especificación
Rendimiento 100.00 Jornada 8.00 UM. ML
Mano de obra Materiales Equipo/Herr Comodines Otros Subanálisis Costo unitario
2.02 14.73 0.10 16.85
Denominación U.M. Rqto Cantidad Precio Parcial
Mano de obra
OPERARIO H-H 1.0000 0.0800 18.57 1.49
PEON H-H 0.5000 0.0400 13.28 0.53
2.02
Materiales
ABRAZADERA DE 3/4" CON 2 OREJAS DE 2mm UND 0.3000 9.10 2.73
CABLE TW 3.5 MM2 O 12 AWG ML 2.1000 3.60 7.56
CINTA AISLANTE ELECTRICA PZA 0.0050 7.80 0.04
CURVA PVC ELECTRICA SEL 3/4" PZA 0.5000 1.00 0.50
TORNILLO DE FIJACIÒN 1" MIL 0.0100 91.50 0.92
TUBERIA PVC SEL ELECTRICA 3MLX 0 3/4 UND 0.3500 8.50 2.98
14.73
Comodines
HERRAMIENTAS MANUALES % 5.0000 2.02 0.10
0.10
05.08 Partida ACONDICIONAMIENTO DE TABLERO GAB. PVC P/DISTRIBUCIÓN ELECTRICA P/3 LLAVES INC. ACCESORIOS
Especificación
Rendimiento 2.00 Jornada 8.00 UM. UND
Mano de obra Materiales Equipo/Herr Comodines Otros Subanálisis Costo unitario
87.56 283.20 4.38 375.14
Denominación U.M. Rqto Cantidad Precio Parcial
Mano de obra
OPERARIO H-H 1.0000 4.0000 18.57 74.28
PEON H-H 0.2500 1.0000 13.28 13.28
87.56
Materiales
INTERRUP. TERMOMAGNETICO MONOFAS. 2X20A PZA 1.0000 57.80 57.80
INTERRUP. TERMOMAGNETICO MONOFAS. 2X32A PZA 2.0000 57.80 115.60
TABLERO GABINETE PVC DE DISTRIBUCION 8 POLOS UND 1.0000 109.80 109.80
283.20
Comodines
HERRAMIENTAS MANUALES % 5.0000 87.56 4.38
4.38
Pag. 6 de 6
OFICINA ZONAL TINGO MARÍA
EXPEDIENTE DE MANTENIMIENTO
3.4.
RELACIÓN DE INSUMOS
C.P.O.C.
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------
RELACION DE INCIDENCIA DE RECURSOS SEGUN EL PRESUPUESTO
CONSOLIDADO
MATERIALES S/ 16,005.77
Item Descripción UM IU Cantidad Unitario Sub total
Pag. 1 de 2
33 MALLA METALICA CON PVC DE 1/4" M² 46 88.8648 15.60 1,386.29
34 PASTA P/JUNTA HAMILTON S 4.5GLN.(BALDE) UND 30 1.3310 55.80 74.27
35 PINTURA AL TEMPLE KG 54 0.3672 40.30 14.80
36 PINTURA ESMALTE GLN 54 1.2349 65.90 81.38
37 PINTURA IMPRIMANTE BOL 54 6.8315 37.80 258.23
38 PINTURA LATEX GLN 54 6.8464 45.90 314.25
39 PLANCHA DE FIBROCEMENTO MULTIPLACA 1.22 X 2.44 X 4MM. UND 30 9.3876 43.40 407.42
40 RODILLO DE 12" PARA PINTAR UND 37 2.0791 23.00 47.82
41 SIKAFLEX GRIS X310ML UND 30 3.4657 43.40 150.41
42 SOCKET DE BAKELITA UND 30 9.0000 13.00 117.00
43 TABLERO GABINETE PVC DE DISTRIBUCION 8 POLOS UND 12 1.0000 109.80 109.80
44 TEMPLE BLANCO KG 55 3.5598 40.30 143.46
45 THINER GLN 55 2.5630 23.00 58.95
46 TOMACORRIENTE BIPOLAR SIMPLE 10A-250V PZA 12 5.0000 18.20 91.00
47 TORNILLO AUTORROSCANTE 1½" MIL 49 0.4251 109.80 46.68
48 TORNILLO DE FIJACIÒN 1" MIL 26 2.0360 91.50 186.29
49 TORNILLO GYPLAC 6X32MM.(MILLAR) CIEN 30 0.4919 11.10 5.46
50 TORNILLO WAFER (P.BROCA) 8X13MM.(MILLAR) CIEN 30 0.0665 98.00 6.52
51 TRIPLAY de 1.20m x 2.40m x 4 MM. UND 44 6.0000 68.40 410.40
52 TUBERIA PVC SEL ELECTRICA 3MLX 0 3/4 UND 72 70.9942 8.50 603.45
53 TUBERIA PVC SEL ELECTRICA FLEXIBLE CORRUGADA 3ML X 0 3/4" UND 72 29.2200 2.00 58.44
54 YESO DE 18 KG. BLS 30 0.5662 13.00 7.36
EQUIPO/HERRAMIENTA S/ 127.15
Item Descripción UM IU Cantidad Unitario Sub total
COMODINES S/ 471.84
Item Descripción UM IU Cantidad Unitario Sub total
RESUMEN
MANO DE OBRA 9,431.99 36.23%
MATERIALES 16,005.77 61.47%
EQUIPO/HERRAMIENTA 127.15 0.49%
COMODINES 471.84 1.81%
OTROS RECURSOS 0.00 0.00%
TOTAL RECURSO S/ 26,036.75
Son: VEINTE Y SEIS MIL TREINTA Y SEIS CON 75/100 Soles
Pag. 2 de 2
C.P.O.C.
MANTENIMIENTO
Item Descripción UM Total
01.00 MANTENIMIENTO DE TECHOS
01.01 REPOSICIÓN DE COBERTURA DE ALUZINC PRE-PINTADA M² 172.89
01.02 REPOSICIÓN DE CUMBRERA ML 15.66
01.03 ACONDICIONAMIENTO DE TIMPANOS CON MALLA METÁLICA M² 20.16
02.00 MANTENIMIENTO DE MUROS
02.01 M² 92.49
ACONDICIONAMIENTO DE ENLUCIDOS EN MUROS DE LADRILLO CON CEMENTO-ARENA
03.02 ACONDICIONAMIENTO DE PUERTA DE MADERA CONTRAPLACADA DE UNA HOJA CON TRAGALUZ, UND 1.00
INC. CERRADURA Y ACCESORIOS
03.03 ACONDICIONAMIENTO DE PUERTA DE MADERA CONTRAPLACADA DOBLE HOJA CON TRAGALUZ, UND 1.00
INC. CERRADURA Y ACCESORIOS
04.00 MANTENIMIENTO DE PINTURAS
04.01 M² 136.63
MANTENIMIENTO CON PINTURA LATEX EN INTERIORES Y EXTERIORES INC. BASE
Pag. 1 de 1
OFICINA ZONAL TINGO MARÍA
EXPEDIENTE DE MANTENIMIENTO
3.8.
PLANILLA DE METRADOS
C.P.O.C.
HOJA DE METRADOS
Proyecto ACONDICIONAMIENTO, MANTENIMIENTO Y REPARACIÓN DE LA INFRAESTRUCTURA DEL
LOCAL COMUNAL DEL CASERÍO JOSÉ CARLOS MARIATEGUI, DISTRITO DE SANTO DOMINGO
DE ANDA, PROVINCIA DE LEONCIO PRADO, DEPARTAMENTO DE HUÁNUCO
Propietario DEVIDA
Departamento HUANUCO Provincia LEONCIO PRADO
Distrito RUPA-RUPA Lugar Tingo María
Hecho por ARQ DIAZ SANCHEZ, CECILIA ::: ARQUITECTA
Revisado por ARQ DIAZ SANCHEZ, CECILIA ::: ARQUITECTA
Fecha viernes, 26 de mayo de 2023
MANTENIMIENTO
Item Descripción UM Veces Largo Ancho Alto Parcial Total
01.00 MANTENIMIENTO DE TECHOS
01.01 M² 172.89
REPOSICIÓN DE COBERTURA DE ALUZINC PRE-PINTADA
Pag. 1 de 3
Item Descripción UM Veces Largo Ancho Alto Parcial Total
03.00 MANTENIMIENTO DE VANOS, PUERTAS Y VENTANAS
03.01 ACONDICIONAMIENTO DE VENTANA DE MARCO Y BASTIDORES DEM² 57.99
MADERAI, INC. MALLA METÁLICA
V-1 1.00 2.00 0.90 1.80
V-2 1.00 1.74 1.78 3.10
V-3 1.00 3.74 1.78 6.66
V-4 2.00 3.33 1.78 11.85
V-5 2.00 3.29 1.78 11.71
V-6 3.00 3.22 1.78 17.19
V-7 1.00 1.15 1.78 2.05
V-8 1.00 2.04 1.78 3.63
03.02 ACONDICIONAMIENTO DE PUERTA DE MADERA CONTRAPLACADAUND 1.00
DE UNA HOJA CON TRAGALUZ, INC. CERRADURA Y ACCESORIOS
P-2 (PUERTA UNA HOJA) 1.00 1.00
03.03 ACONDICIONAMIENTO DE PUERTA DE MADERA CONTRAPLACADAUND 1.00
DOBLE HOJA CON TRAGALUZ, INC. CERRADURA Y ACCESORIOS
P-1 (PUERTA DOBLE HOJA) 1.00 1.00
04.00 MANTENIMIENTO DE PINTURAS
04.01 MANTENIMIENTO CON PINTURA LATEX EN INTERIORES Y M² 136.63
EXTERIORES INC. BASE
EJE 1(A-B) 2.00 1.74 1.22 4.25
EJE 1(B-C), EJE 5(A-B), EJE 5(B-C) 6.00 3.74 1.22 27.38
EJE A(1-2), EJE C(1-2) 4.00 3.33 1.22 16.25
EJE A(2-3), EJE C(2-3) 4.00 3.29 1.22 16.06
EJE A(3-4), EJE A(4-5), EJE C(4-5) 6.00 3.22 1.22 23.57
EJE C(3-4) 2.00 2.04 1.22 4.98
COLUMNAS
EJE A-1, C-4 2.00 0.65 3.00 3.90
EJE A-2, A-3, A-4, A-5, B-5, C-5, C-3, C-2, C-1, B-1 10.00 0.50 3.00 15.00
VENTANAS
EJE A(1-2), C(1-2) 2.00 3.33 0.15 1.00
EJE A(1-2), A(2-3), A(3-4), A(4-5), 5(A-B), 5(B-C), C(5-4), C(4-3),C(3-2), C 22.00 0.15 1.78 5.87
(1-2
EJE A(2-3), C(3-2) 2.00 3.29 0.15 0.99
EJE A(3-4), A(4-5), C(5-4) 3.00 3.22 0.15 1.45
EJE 5(A-B), 5(B-C), 1(B-C) 3.00 3.74 0.15 1.68
EJE C(4-3) 1.00 2.04 0.15 0.31
EJE 1(A-B) 1.00 1.74 0.15 0.26
PUERTAS
EJE 1(A-B), C(3-4) 2.00 0.15 1.22 0.37
EJE 5(A-B) MURO DRYWALL 2.00 3.74 1.78 13.31
04.02 MANTENIMIENTO CON PINTURA ESMALTE EN CONTRAZOCALOS M² 24.66
INC. BASE
EXTERIORES
EJE 1(A-B) 1.00 1.74 0.40 0.70
EJE 1(B-C) 1.00 3.74 0.40 1.50
EJE A(1-2), EJE C(1-2) 2.00 3.33 0.40 2.66
EJE A(2-3), EJE C(2-3) 2.00 3.29 0.40 2.63
EJE A(3-4), A(4-5), C(4-5) 3.00 3.22 0.40 3.86
EJE C(3-4) 1.00 2.04 0.40 0.82
EJE 5(A-B), 5(B-C) 2.00 3.74 0.40 2.99
INTERIORES
EJE 1(A-B) 1.00 1.74 0.25 0.44
EJE 1(B-C) 1.00 3.74 0.25 0.94
EJE A(1-2), EJE C(1-2) 2.00 3.33 0.25 1.67
EJE A(2-3), EJE C(2-3) 2.00 3.29 0.25 1.65
EJE A(3-4), A(4-5), C(4-5) 3.00 3.22 0.25 2.42
EJE C(3-4) 1.00 2.04 0.25 0.51
EJE 5(A-B), 5(B-C) 2.00 3.74 0.25 1.87
05.00 MANTENIMIENTO DEL SISTEMA ELECTRICO
Pag. 2 de 3
Item Descripción UM Veces Largo Ancho Alto Parcial Total
05.01 REPOSICIÓN DE CENTRO DE LUZ TECHO INC. LUMINARIA Y PTO 9.00 9.00 9.00
ACCESORIOS
05.02 REPOSICIÓN DE INTERRUPTOR SIMPLE PTO 1.00 1.00 1.00
05.03 REPOSICIÓN DE INTERRUPTOR DOBLE PTO 2.00 2.00 2.00
05.04 PICADO Y RESANE DE MURO Y PISO PARA EMPOTRADO DE ML 105.10
TUBERÍA PARA TOMACORRIENTE
Medidor a Tablero de Distribución 2.00 20.50 41.00
Tomacorrientes 2.00 32.05 64.10
05.05 REPOSICIÓN DE TOMACORRIENTE DOBLE PTO 5.00 5.00 5.00
05.06 REPOSICIÓN DE CABLEADO CONDUCTOR TW #14 INC. TUBERÍA ML 97.40
(LIZA/CORRUGADA) Y ACCESORIOS
Luminarias 2.00 48.70 97.40
05.07 REPOSICIÓN DE CABLEADO CONDUCTOR TW #12 INC. TUBERÍA ML 105.10
(LIZA/CORRUGADA) Y ACCESORIOS
Medidor a Tablero de Distribución 2.00 20.50 41.00
Tomacorrientes 2.00 32.05 64.10
05.08 ACONDICIONAMIENTO DE TABLERO GAB. PVC P/DISTRIBUCIÓN UND 1.00 1.00 1.00
ELECTRICA P/3 LLAVES INC. ACCESORIOS
Pag. 3 de 3
OFICINA ZONAL TINGO MARÍA
EXPEDIENTE DE MANTENIMIENTO
3.9.
CÁLCULO DE COSTO HORA HOMBRE
CALCULO DE COSTO HORA HOMBRE PARA MANTENIMIENTO DE INFRAESTRUCTURA PRODUCTIVA
EXPEDIENTE DE MANTENIMIENTO
4.
CARACTERÍSTICAS TÉCNICAS
OFICINA ZONAL TINGO MARÍA
EXPEDIENTE DE MANTENIMIENTO
5.
PLANOS
Río H
uallag
a
E-225000
E-300000
E-375000
E-450000
E-525000
N-9075000 PUCALLPA N-9075000
LA LIBERTAD SAN MARTIN N.M
MOYNA
PUENTE ANGASHYACU
MARAÑON
E-500000
E-1000000
E-0
N-10000000 N-10000000
LEONCIO PRADO
UCAYALI
HUACAYBAMBA
AGUAYTIA
N-9000000 N-9000000
COLOMBIA LEONCIO PRADO UCAYALI
PAMPA HERMOSA
ECUADOR ANDA
Jr. Chiclayo BZ-1 SANTA
AA.HH
Jr.
E "DOS
Km:0+000.00
0+060
0+050
0+040
0+030
0+010
0+023
0+020
0+000
VE-M
VE-B
N
INICIO
MURO
E IS EN
DE E
0+060.00
0+050.00
0+040.00
0+030.00
0+000.00
0+002.50
0+005.00
0+007.50
0+010.00
0+012.50
0+015.00
0+017.50
0+020.00
0+022.50
0+022.69
RECTANGULAR
REJÍLLA
CUNETA
0.94
12
11
10
09
08
07
06
05
04
03
02
01
ESCALERA ROSA
CON
321 AMIGOS"
RAMO
ENCI N
(15)CON
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
(24)
CERRADA
ABIERTO Psje
BZ-4
BZ-2
BZ-3
CALICA
N Nuevo
Km:-0+000.00
178NMURO
0+140
0+130
-0+0
0+047
0+040
0+030
VE-B
0+010.00
0+007.50
0+005.00
0+002.50
-0+000.00
0+140.00
0+130.00
0+120.00
0+110.00
0+100.00
0+090.00
0+080.00
0+070.00
0+020.00
0+017.50
0+015.00
0+012.50
0+030.00
0+027.50
0+025.00
0+022.50
0+040.00
0+037.50
0+035.00
0+032.50
0+045.00
0+042.50
REJÍLLA
CON A+090
+120
+020
RECTANGULAR
CUNETA
REJÍLLADE CON ENCI N
(1) CON
(2)
(3)
(4)
CERRADA
ABIERTO
LOS NOGALES
BZ-7
CALICA A
N
Km:0+017.72
VE-M DE CON ENCI N
MURO
N
CUNETA
RECTANGULAR
REJÍLLA
05
04
03
02
01
ESCALERA 8 CERRADA
CON
Km:0+046.94
CALLE PRIMAVERA
0+280
1
BZ-5
BZ-6
BZ-8
PJE.
17NVE-M
CUNETA Km:0+000.00
Km:0+018.39
0+160
0+150
0+250
0+240
0+230
0+220
0+200
0+190
0+270
0+008
0+015
0+000
0+018
0+210
MURO
E
0+280.00
0+270.00
0+260.00
0+250.00
0+240.00
0+230.00
0+220.00
0+210.00
0+200.00
0+190.00
0+170.00
0+160.00
0+150.00
0+046.94
0+018.39
0+014.74
0+002.50
0+000.00
0+007.88
0+005.00
0+007.50
0+010.00
0+012.50
0+015.00
0+017.50
0+017.72
RECTANGULAR
REJÍLLA
18
17
16
15
14
13
12
11
10
09
08
07
06
05
04
03
02
01
2
ESCALERA +180
+260
IS EN
36548DE E
CON ENCI N
(25)CON
(26)
(27)
(28)
(29)
(30)
(31)
(32)
(39)
(40)
(41)
(42)
(43)
(44)
(45)
(46)
(47)
(48)
(49)
(51)
(52)
(53)
(54)
(55)
(56)
ABIERTO
CERRADA
FIN DE PROYECTO
06
05
04
03
02
01 Km:0+316.67
0+290
VE-B
VE-B
VE-M0+317
0+310
+300
0+316.67
0+310.00
0+300.00
0+290.00
CUNETA
RECTANGULAR
REJÍLLA
07
2
ESCALERA 389 CERRADA
CON
PUERTO INCA
HUAMALIES
DOS DE MAYO
PUERTO PRADO
N-9500000
TUMBES
LA LIBERTAD
N-8850000
LIMA
N-8850000
CEDROS
C
BRASIL
E
E-225000
E-300000
E-375000
E-450000
E-525000
N-9000000 UCAYALI N-9000000
A
ANCASH AA.HH
Jr.
E
VE-MChiclayo
SANTA
0+050
0+040
0+030
0+010 "DOS
Km:0+000.00
0+023
0+020
0+000
VE-B ROSA
AMIGOS"
Psje Nuevo
CALICA A
N
BZ-1
BZ-2
BZ-3
VE-M Km:-0+000.00
-0+180+060
VE-B
+090
+020
CALICA A
N CALLE PRIMAVERA
1
FIN
CALICA
N DEAPROYECTO
BZ-5NOGALES
BZ-4
BZ-8
BZ-7
BZ-6
LOS
PJE.
VE-M
17VE-B
0+160
0+150
0+140Km:0+316.67
Km:0+046.94
Km:0+017.72
Km:0+000.00
Km:0+018.39
50+130
0+240
0+230
0+220
0+200
0+290+190
0+280
0+270
0+317
0+310
0+047
0+040
0+008
0+015
0+000
0+018
0+030
0+210
+180
+260
+300
N
HUANUCO
O
N.M
PASCO LOCALIZACION PROVINCIAL LOCALIZACION DISTRITAL
P
LIMA
I
na
I
BOLIVIA
le
HUANCAVELICA
C
da
ARABE
Río H
ag
N-8500000 CUZCO N-8500000
O
TUPAC AMARU
M
AYACUCHO
o
Rí
uallag
APURIMAC
ICA
a
PUNO
AREQUIPA
MOYNA
PUENTE ANGASHYACU
MOQUEGUA
TACNA
LEONCIO PRADO PUERTO PRADO
ANDA
PAMPA HERMOSA
CAMPOGRANDE
ALTO CURACHA VENENILLO ALFONSO UGARTE
SANTA MARTHA
E-0
CEDROS
BELEN
LOURDES
MARGARITA
PROYECTO:
UBICACION:LUGAR : JOSE CARLOS MARIATEGUI
PLANO: LAMINA:
DEVIDA ACONDICIONAMIENTO, MANTENIMIENTO Y DIST. : ANDA
PROV. : LEONCIO PRADO
REPARACIÓN DE LA INFRAESTRUCTURA DEL LOCAL
CONSULTOR:
CONSFERAC E.I.R.L.
COMUNAL DEL CASERÍO JOSÉ CARLOS MARIATEGUI,
DISTRITO DE SANTO DOMINGO DE ANDA, PROVINCIA
DE LEONCIO PRADO, DEPARTAMENTO DE HUÁNUCO
UBICACIÓN DIGITALIZADO:
ESCALA:
REGION: HUANUCO
B.H.F.A
FECHA:
JUNIO 2023
CODIGO PROYECTO:
U
1/75 @PROY-2023 03
DETALLES DE VENTANAS
A B C V-01 V-02
P-2 1.15 2.10 01
BATIENTE/MADERA CONTRAPLACADA
UNA HOJA (ACONDICIONAMIENTO)
.900
.900
8.08
3.94 muro bajo 3.94 muro bajo
h=1.24 h=1.24
.20 3.74 .20 3.74 .20
1.780
1.780
5 5
.20
.20
CUADRO DE VANOS-VENTANAS
2.000
TIPO ANCHO ALTO ALFEIZ. CANTIDAD OBSERVACIONES
V-1 2.00 0.90 2.10 01 VENTANA FIJA - MADERA Y MALLA (ACONDICIONAMIENTO)
Drywall con plancha 12 UND Columnas de concreto Drywall con plancha
h=3.00m V-2 1.74 1.78 1.22 01 VENTANA FIJA - MADERA Y MALLA (ACONDICIONAMIENTO)
fibrocemento fibrocemento
Actividad a Intervenir COLUMNAS A ENLUCIR Actividad a Intervenir V-3 3.74 1.78 1.22 01 VENTANA FIJA - MADERA Y MALLA (ACONDICIONAMIENTO)
h=1.24 h=1.24 V-5 3.29 1.78 1.22 02 VENTANA FIJA - MADERA Y MALLA (ACONDICIONAMIENTO)
MURO A ENLUCIR MURO A ENLUCIR V-6 3.22 1.78 1.22 03 VENTANA FIJA - MADERA Y MALLA (ACONDICIONAMIENTO)
Actividad a Intervenir Actividad a Intervenir 01
V-7 1.15 1.78 2.10 VENTANA FIJA - MADERA Y MALLA (ACONDICIONAMIENTO)
3.22
3.42
3.22
3.42
V-06 V-06
1.740
.20
.20
4 4
3.740
DETALLES DE TABIQUE DE
3.330
DRYWALL
V-07 P-02 3.74
muro bajo muro bajo
h=1.24 h=1.24
MURO A ENLUCIR MURO A ENLUCIR
V-03 V-4
Actividad a Intervenir Actividad a Intervenir
3.42
3.22
3.42
V-06
1.78
2.04
.86
1.780
1.780
1.780
1.780
Salón de Usos
Múltiples .59 .59 .59 .59 .59 .59 .17
N.P.T. + 0.15
.20
.20
14.06
14.06
3 3
Piso Cemento Pulido
Actividad de no Intervenir Actividad a Intervenir
3.29
3.29
3.49
V-05 V-05
3.220
3.290
.20
.20
2 2
V-5 V-06
3.33
3.53
3.53
1.780
1.780
1.780
1.780
V-04 V-04
.20
2.15
1 1 MAMPARAS Y PORTON
P-01
3.290 V1 1.99
.20 2.00 1.74 .20 3.74 .20 3.220 NOMENCLATURA DE VENTANAS Y 1.02 1.11
VANOS
3.94 3.94
A B C 1.150
2.00 1.15 TIPO DE PUERTA ANCHO TIPO DE PUERTA SE REFIERE A GRUPOS
CARACTERIZADOS POR SU ANCHO, MATERIAL Y
ACCESORIOS: VISOR, REJILLA, PROTECTORES.
1.37
P1
2.15 LA ALTURA TIPICA DE LAS PUERTAS ES DE 2.10, EL DINTEL
ESTA DEFINIDO POR LA ALTURA DEL PISO Y LAS VIGAS.
V-07 ALTO
ARQUITECTURA
2.15
2.15
.900
.900
PROYECTO:
UBICACION:LUGAR : JOSE CARLOS MARIATEGUI
PLANO: LAMINA:
DEVIDA ACONDICIONAMIENTO, MANTENIMIENTO Y DIST. : ANDA
ESCALA:
B.H.F.A
FECHA:
CODIGO PROYECTO:
JUNIO 2023
01
1/75 @PROY-2023 03
OFICINA : JULIO BURGA 588 - 3ER PISO TINGO MARIA - 935544326
Actividad a Intervenir
0 2.4
2.4 0
5.16
CORREAS DE CORREAS DE
40x60 40x60
0 2.4
2.4 0
CORREAS DE CORREAS DE
40x60 40x60
1.78
1.78
1.78
Actividad a Intervenir Actividad a Intervenir
3.00
3.00
3.00
3.00
Actividad a Intervenir
1.22
1.22
1.22
1.22
Actividad a Intervenir Actividad a Intervenir Actividad a Intervenir Actividad a Intervenir P-02 Actividad a Intervenir
Actividad a Intervenir
0.35 CORREAS DE
Cumbrera
CORREAS DE Actividad a Intervenir 40x60
3"x2"
0 2.4
2.4 0
5.16
CORREAS DE
3"x2" CORREAS DE CORREAS DE
40x60 40x60
0 2.4
2.4 0
CORREAS DE
3"x2"
CORREAS DE CORREAS DE
40x60 40x60
1.75
1.75
1.78
1.78
3.00
3.00
3.00
3.00
1.25
1.25
1.22
1.22
Actividad a Intervenir
Actividad a Intervenir Actividad a Intervenir Actividad a Intervenir Actividad a Intervenir P-01 Actividad a Intervenir
Actividad a Intervenir
.00
.20 3.22 .20 3.22 .20 3.29 .20 3.33
2.20 1.74 .20 3.74 .20
14.06
ELEVACIÓN 8.08
EJE A-A ELEVACIÓN
EJE 1-1
PROYECTO:
UBICACION:LUGAR : JOSE CARLOS MARIATEGUI
PLANO: LAMINA:
DEVIDA ACONDICIONAMIENTO, MANTENIMIENTO Y DIST. : ANDA
ESCALA:
B.H.F.A
FECHA:
JUNIO 2023
CODIGO PROYECTO:
02
1/75 @PROY-2023 03
OFICINA : JULIO BURGA 588 - 3ER PISO TINGO MARIA - 935544326
A B C
8.08
5 5
4 4
INSTALACIONES ELECTRICAS
LEYENDA
SIMBOLO DESCRIPCION ALTURA
Salón de Usos
Múltiples
N.P.T. + 0.15
14.06
14.06
3 3
Piso Cemento Pulido
2 2
1 1
8.08
A C
INSTALACIONES ELECTRICAS
PRIMERA PLANTA
ESC. 1/75
PROYECTO:
UBICACION:LUGAR : JOSE CARLOS MARIATEGUI
PLANO: LAMINA:
DEVIDA ACONDICIONAMIENTO, MANTENIMIENTO Y DIST. : ANDA
ESCALA:
B.H.F.A
FECHA:
JUNIO 2023
CODIGO PROYECTO:
01
1/75 @PROY-2023 03
OFICINA : JULIO BURGA 588 - 3ER PISO TINGO MARIA - 935544326
0.35 CORREAS DE
40x60
0 2.4
2.4 0
5.16
CORREAS DE CORREAS DE
40x60 40x60
0 2.4
2.4 0
CORREAS DE CORREAS DE
40x60 40x60
PROYECTO:
UBICACION:LUGAR : JOSE CARLOS MARIATEGUI
PLANO: LAMINA:
DEVIDA ACONDICIONAMIENTO, MANTENIMIENTO Y DIST. : ANDA
ESCALA:
B.H.F.A
FECHA:
JUNIO 2023
CODIGO PROYECTO:
01
1/75 @PROY-2023 03
OFICINA : JULIO BURGA 588 - 3ER PISO TINGO MARIA - 935544326
OFICINA ZONAL TINGO MARÍA
EXPEDIENTE DE MANTENIMIENTO
6.
PROGRAMACIÓN DE EJECUCIÓN
DE ACTIVIDADES
Id Nombre de tarea Duración Comienzo Fin 03 jul '23 10 jul '23 17 jul '23 24 jul '23 31 jul '23
S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S
1 MANTENIMIENTO 30 días lun 03/07/23jue 03/08/23
6 ACONDICIONAMIENTO DE TIMPANOS MALLA METÁLICA DE 1/4" 2 días vie 07/07/23 lun 10/07/23
8 MURO DE SOGA BLOQUETA DE LADRILLO - MEZCLA C:A 1:5 1 día lun 10/07/23 mar 11/07/23
18 MANTENIMIENTO CON PINTURA LATEX EN EXTERIORES INC. BASE 4 días lun 17/07/23 jue 20/07/23
19 MANTENIMIENTO CON PINTURA ESMALTE EN CONTRAZOCALOS 1 día vie 21/07/23 vie 21/07/23
INC. BASE
20 MANTENIMIENTO DEL SISTEMA ELECTRICO 12 días vie 21/07/23 jue 03/08/23
21 REPOSICIÓN DE CENTRO DE LUZ TECHO INC. LUMINARIA Y 1 día vie 21/07/23 vie 21/07/23
ACCESORIOS
22 REPOSICIÓN DE INTERRUPTOR SIMPLE 1 día vie 21/07/23 sáb 22/07/23
24 PICADO Y RESANE DE MURO Y PISO PARA EMPOTRADO DE 5 días vie 21/07/23 jue 27/07/23
TUBERÍA PARA TOMACORRIENTE
25 REPOSICIÓN DE TOMACORRIENTE DOBLE 1 día jue 27/07/23 vie 28/07/23
26 REPOSICIÓN DE CABLEADO CONDUCTOR TW #14 INC. TUBERÍA 1 día vie 28/07/23 sáb
(LIZA/CORRUGADA) Y ACCESORIOS 29/07/23
27 REPOSICIÓN DE CABLEADO CONDUCTOR TW #12 INC. TUBERÍA 2 días sáb mar
(LIZA/CORRUGADA) Y ACCESORIOS 29/07/23 01/08/23
28 ACONDICIONAMIENTO DE TABLERO GAB. PVC P/DISTRIBUCIÓN 1 día mar mié
ELECTRICA P/3 LLAVES INC. ACCESORIOS 01/08/23 02/08/23
29 FIN 0 días jue 03/08/23 jue 03/08/23 03/08
Tarea Resumen del proyecto Tarea manual solo el comienzo Fecha límite
Proyecto: 4.3 CRONOGRAMA G División Tarea inactiva solo duración solo fin Progreso
Fecha: 20/05/2023 Hito Hito inactivo Informe de resumen manual Tareas externas Progreso manual
Página 1
OFICINA ZONAL TINGO MARÍA
EXPEDIENTE DE MANTENIMIENTO
7.
PANEL FOTOGRÁFICO
OFICINA ZONAL TINGO MARÍA
7. PANEL FOTOGRAFICO
Fotografía 01: Se aprecia vista panorámica, lados lateral y posterior que es de muro de ladrillos del local
comunal del caserío José Carlos Mariátegui.
Fotografía 05 y 06: Se aprecia el interiordel local comunal sin ventanas ni puertas, presto para el
acondicionamiento de puertas y ventanas.
Fotografía 07 y 08: Se aprecia los muros interiores y exteriores sin revestimiento, porque que se requiere la
reposición de tarrajeo en muros, posterior a ello se realizará el pintado general.
EXPEDIENTE DE MANTENIMIENTO
8.
ANEXOS
OFICINA ZONAL TINGO MARÍA
EXPEDIENTE DE MANTENIMIENTO
APORTE
BENEFICIARIOS
C.P.O.C.
ESTRUCTURA METALICA
Item Descripción UM Total
01.00 ESTRUCTURAS METALICAS PARA LOCAL COMUNAL JOSE CARLOS
01.01 MARIATEGUI
TIJERALES
01.01.01 TIJERAL RETICULADO DOS AGUAS ML 184.40
01.02 CORREAS
01.02.01 CORREA DE TUBO RECTANGULAR DE 40X60mm ML 96.36
01.03 CANALETAS PLUVIALES
01.03.01 CANALETA PZA 13.40
Pag. 1 de 1
C.P.O.C.
HOJA DE METRADOS
Proyecto ESTRUCTURA METALICA PARA EL ACONDICIONAMIENTO, MANTENIMIENTO Y REPARACIÓN DE LA INFRAESTRUCTURA
DEL LOCAL COMUNAL DEL CASERÍO JOSÉ CARLOS MARIATEGUI, DISTRITO DE SANTO DOMINGO DE ANDA, PROVINCIA
DE LEONCIO PRADO, DEPARTAMENTO DE HUÁNUCO
Propietario DEVIDA
Departamento HUANCAVELICA Provincia TAYACAJA
Distrito COLCABAMBA Lugar JOSE CARLOS MARIATEGUI
Hecho por ARQ Díaz Sánchez, Cecilia ::: ARQUITECTA
Revisado por ARQ Díaz Sánchez, Cecilia ::: ARQUITECTA
Fecha jueves, 11 de mayo de 2023
ESTRUCTURA METALICA
Item Descripción UM Veces Largo Ancho Alto Parcial Total
01.00 ESTRUCTURAS METALICAS PARA LOCAL COMUNAL
JOSE CARLOS MARIATEGUI
01.01 TIJERALES
01.01.01 TIJERAL RETICULADO DOS AGUAS ML 184.40
Brida Superior
lado A 5.00 4.95 24.75
lado B 5.00 4.95 24.75
Brida Inferior
lado A 5.00 0.82 4.10
5.00 3.99 19.95
lado B 5.00 0.82 4.10
5.00 3.99 19.95
Montantes lado A y B
10.00 0.20 2.00
5.00 0.74 3.70
10.00 0.69 6.90
10.00 0.63 6.30
10.00 0.57 5.70
10.00 0.51 5.10
Diagonales lado A y B
10.00 1.31 13.10
10.00 1.40 14.00
10.00 1.02 10.20
10.00 1.01 10.10
10.00 0.97 9.70
01.02 CORREAS
01.02.01 CORREA DE TUBO RECTANGULAR DE 40X60mm ML 96.36
lado A
3.00 16.06 48.18
lado B
3.00 16.06 48.18
01.03 CANALETAS PLUVIALES
01.03.01 CANALETA PZA 13.40
lado A 1.00 6.70 6.70
lado B 1.00 6.70 6.70
Pag. 1 de 1
C.P.O.C.
ESTRUCTURA METALICA
Item Descripción UM Metrado Costo Costo
Sub Total
Unitario Parcial
01.00 ESTRUCTURAS METALICAS PARA LOCAL COMUNAL JOSE CARLOS MARIATEGUI 9,460.89
Pag. 1 de 1
C.P.O.C.
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------
RELACION DE INCIDENCIA DE RECURSOS SEGUN EL PRESUPUESTO
CONSOLIDADO
MATERIALES S/ 5,089.74
Item Descripción UM IU Cantidad Unitario Sub total
EQUIPO/HERRAMIENTA S/ 1,138.72
Item Descripción UM IU Cantidad Unitario Sub total
COMODINES S/ 153.83
Item Descripción UM IU Cantidad Unitario Sub total
RESUMEN
MANO DE OBRA 3,078.60 32.54%
MATERIALES 5,089.74 53.80%
EQUIPO/HERRAMIENTA 1,138.72 12.04%
COMODINES 153.83 1.63%
OTROS RECURSOS 0.00 0.00%
TOTAL RECURSO S/ 9,460.89
Son: NUEVE MIL CUATROCIENTOS SESENTA CON 89/100
Soles
Pag. 1 de 1
C.P.O.C.
ESTRUCTURA METALICA
Pag. 2 de 2