FORMATO CONTROL Y SUPERVICION DE NIVELES Y LOCALIZACIÓN PARA ENTREGA

FECHA:

PROYECTO: SALINAS CARRERA 17 CONSTRUCTORA: CONSTRUCTORA AR

CONTRATISTA: FSC INGENIEROS S.A.S

CONTIENE:

ANDEN SALINAS 1 CALZADA ANDEN SALINAS 2


ABSCISA
BORDILLO A BORDILLO A BORDILLO A BORDILLO
SARDINEL ASFALTO IZQUIERDA EJE ASFALTO DERECHA ASFALTO SARDINEL
2.8 M 1M 1M A 2.8 M
cota cota cota pendiente cota cota cota pendiente cota cota cota
ADOQUIN ASFALTO ADOQUIN
Empalme
k0+010 2594.966 2594.930 2594.910 0.62% 2594.710 2594.744 2594.770 -0.74% 2594.970 2594.990 2595.026
k0+020 2595.126 2595.090 2595.070 2% 2594.870 2594.940 2595.010 -2% 2595.210 2595.230 2595.266
k0+030 2595.576 2595.540 2595.520 2% 2595.320 2595.390 2595.460 -2% 2595.660 2595.680 2595.716
k0+040 2595.936 2595.900 2595.880 2% 2595.680 2595.750 2595.820 -2% 2596.020 2596.040 2596.076
k0+050 2596.096 2596.060 2596.040 2% 2595.840 2595.910 2595.980 -2% 2596.180 2596.200 2596.236
k0+060 2596.146 2596.110 2596.090 2% 2595.890 2595.960 2596.030 -2% 2596.230 2596.250 2596.286
k0+070 2596.196 2596.160 2596.140 2% 2595.940 2596.010 2596.080 -2% 2596.280 2596.300 2596.336
k0+080 2596.246 2596.210 2596.190 2% 2595.990 2596.060 2596.130 -2% 2596.330 2596.350 2596.386
k0+090 2596.296 2596.260 2596.240 2% 2596.040 2596.110 2596.180 -2% 2596.380 2596.400 2596.436
k0+100 2596.346 2596.310 2596.290 2% 2596.090 2596.160 2596.230 -2% 2596.430 2596.450 2596.486
k0+110 2596.396 2596.360 2596.340 2% 2596.140 2596.210 2596.280 -2% 2596.480 2596.500 2596.536
k0+120 2596.446 2596.410 2596.390 2% 2596.190 2596.260 2596.330 -2% 2596.530 2596.550 2596.586
k0+130 2596.496 2596.460 2596.440 2% 2596.240 2596.310 2596.380 -2% 2596.580 2596.600 2596.636
k0+140 2596.546 2596.510 2596.490 2% 2596.290 2596.360 2596.430 -2% 2596.630 2596.650 2596.686
k0+150 2596.596 2596.560 2596.540 2% 2596.340 2596.410 2596.480 -2% 2596.680 2596.700 2596.736
k0+160 2596.646 2596.610 2596.590 2% 2596.390 2596.460 2596.530 -2% 2596.730 2596.750 2596.786
k0+170 2596.696 2596.660 2596.640 2% 2596.440 2596.510 2596.580 -2% 2596.780 2596.800 2596.836
k0+180 2596.786 2596.750 2596.730 2% 2596.530 2596.600 2596.670 -2% 2596.870 2596.890 2596.926
k0+186.5 2596.871 2596.835 2596.815 2596.615 2596.704 2596.806 2597.006 2597.026 2597.062
FORMATO CONTROL Y SUPERVICION DE NIVELES Y LOCALIZACIÓN PARA ENTREGA
FECHA:

PROYECTO: SALINAS CARRERA 17 CONSTRUCTORA: CONSTRUCTORA AR

CONTRATISTA: FSC INGENIEROS S.A.S

CONTIENE:

ANDEN SALINAS 1 CALZADA ANDEN SALINAS 2


ABSCISA
A 2.8 M A 1M SARDINEL IZQUIERDA EJE ASFALTO DERECHA SARDINEL A 1M A 2.8 M

cota cota cota pendiente cota cota cota pendiente cota cota cota
SUB-BASE BASE SUB-BASE
Empalme -0.100 -0.100 -0.100 -0.160 -0.160 -0.160 -0.100 -0.100 -0.100
k0+010 2594.866 2594.830 2594.810 2594.550 2594.584 2594.610 2594.870 2594.890 2594.926
k0+020 2595.026 2594.990 2594.970 2594.710 2594.780 2594.850 2595.110 2595.130 2595.166
k0+030 2595.476 2595.440 2595.420 2595.160 2595.230 2595.300 2595.560 2595.580 2595.616
k0+040 2595.836 2595.800 2595.780 2595.520 2595.590 2595.660 2595.920 2595.940 2595.976
k0+050 2595.996 2595.960 2595.940 2595.680 2595.750 2595.820 2596.080 2596.100 2596.136
k0+060 2596.046 2596.010 2595.990 2595.730 2595.800 2595.870 2596.130 2596.150 2596.186
k0+070 2596.096 2596.060 2596.040 2595.780 2595.850 2595.920 2596.180 2596.200 2596.236
k0+080 2596.146 2596.110 2596.090 2595.830 2595.900 2595.970 2596.230 2596.250 2596.286
k0+090 2596.196 2596.160 2596.140 2595.880 2595.950 2596.020 2596.280 2596.300 2596.336
k0+100 2596.246 2596.210 2596.190 2595.930 2596.000 2596.070 2596.330 2596.350 2596.386
k0+110 2596.296 2596.260 2596.240 2595.980 2596.050 2596.120 2596.380 2596.400 2596.436
k0+120 2596.346 2596.310 2596.290 2596.030 2596.100 2596.170 2596.430 2596.450 2596.486
k0+130 2596.396 2596.360 2596.340 2596.080 2596.150 2596.220 2596.480 2596.500 2596.536
k0+140 2596.446 2596.410 2596.390 2596.130 2596.200 2596.270 2596.530 2596.550 2596.586
k0+150 2596.496 2596.460 2596.440 2596.180 2596.250 2596.320 2596.580 2596.600 2596.636
k0+160 2596.546 2596.510 2596.490 2596.230 2596.300 2596.370 2596.630 2596.650 2596.686
k0+170 2596.596 2596.560 2596.540 2596.280 2596.350 2596.420 2596.680 2596.700 2596.736
k0+180 2596.686 2596.650 2596.630 2596.370 2596.440 2596.510 2596.770 2596.790 2596.826
k0+186.5 2596.771 2596.735 2596.715 2596.455 2596.544 2596.646 2596.906 2596.926 2596.962
FORMATO CONTROL Y SUPERVICION DE NIVELES Y LOCALIZACIÓN PARA ENTREGA
FECHA:

PROYECTO: SALINAS CARRERA 17 CONSTRUCTORA: CONSTRUCTORA AR

CONTRATISTA: FSC INGENIEROS S.A.S

CONTIENE:

ANDEN SALINAS 1 CALZADA ANDEN SALINAS 2


ABSCISA
A 2.8 M A 1M SARDINEL IZQUIERDA EJE ASFALTO DERECHA SARDINEL A 1M A 2.8 M

cota cota cota pendiente cota cota cota pendiente cota cota cota
RAJON SUB-BASE RAJON
Empalme -0.400 -0.400 -0.400 -0.410 -0.410 -0.410 -0.400 -0.400 -0.400
k0+010 2594.566 2594.530 2594.510 2594.300 2594.334 2594.360 2594.570 2594.590 2594.626
k0+020 2594.726 2594.690 2594.670 2594.460 2594.530 2594.600 2594.810 2594.830 2594.866
k0+030 2595.176 2595.140 2595.120 2594.910 2594.980 2595.050 2595.260 2595.280 2595.316
k0+040 2595.536 2595.500 2595.480 2595.270 2595.340 2595.410 2595.620 2595.640 2595.676
k0+050 2595.696 2595.660 2595.640 2595.430 2595.500 2595.570 2595.780 2595.800 2595.836
k0+060 2595.746 2595.710 2595.690 2595.480 2595.550 2595.620 2595.830 2595.850 2595.886
k0+070 2595.796 2595.760 2595.740 2595.530 2595.600 2595.670 2595.880 2595.900 2595.936
k0+080 2595.846 2595.810 2595.790 2595.580 2595.650 2595.720 2595.930 2595.950 2595.986
k0+090 2595.896 2595.860 2595.840 2595.630 2595.700 2595.770 2595.980 2596.000 2596.036
k0+100 2595.946 2595.910 2595.890 2595.680 2595.750 2595.820 2596.030 2596.050 2596.086
k0+110 2595.996 2595.960 2595.940 2595.730 2595.800 2595.870 2596.080 2596.100 2596.136
k0+120 2596.046 2596.010 2595.990 2595.780 2595.850 2595.920 2596.130 2596.150 2596.186
k0+130 2596.096 2596.060 2596.040 2595.830 2595.900 2595.970 2596.180 2596.200 2596.236
k0+140 2596.146 2596.110 2596.090 2595.880 2595.950 2596.020 2596.230 2596.250 2596.286
k0+150 2596.196 2596.160 2596.140 2595.930 2596.000 2596.070 2596.280 2596.300 2596.336
k0+160 2596.246 2596.210 2596.190 2595.980 2596.050 2596.120 2596.330 2596.350 2596.386
k0+170 2596.296 2596.260 2596.240 2596.030 2596.100 2596.170 2596.380 2596.400 2596.436
k0+180 2596.386 2596.350 2596.330 2596.120 2596.190 2596.260 2596.470 2596.490 2596.526
k0+186.5 2596.471 2596.435 2596.415 2596.205 2596.294 2596.396 2596.606 2596.626 2596.662
FORMATO CONTROL Y SUPERVICION DE NIVELES Y LOCALIZACIÓN PARA ENTREGA
FECHA:

PROYECTO: SALINAS CARRERA 17 CONSTRUCTORA: CONSTRUCTORA AR

CONTRATISTA: FSC INGENIEROS S.A.S

CONTIENE:

ANDEN SALINAS 1 CALZADA ANDEN SALINAS 2


ABSCISA
A 2.8 M A 1M SARDINEL IZQUIERDA EJE ASFALTO DERECHA SARDINEL A 1M A 2.8 M

cota cota cota pendiente cota cota cota pendiente cota cota cota
EXCAVACION GEOTEXTIL EXCAVACION
Empalme -0.600 -0.600 -0.600 -0.710 -0.710 -0.710 -0.600 -0.600 -0.600
k0+010 2594.366 2594.330 2594.310 2594.000 2594.034 2594.060 2594.370 2594.390 2594.426
k0+020 2594.526 2594.490 2594.470 2594.160 2594.230 2594.300 2594.610 2594.630 2594.666
k0+030 2594.976 2594.940 2594.920 2594.610 2594.680 2594.750 2595.060 2595.080 2595.116
k0+040 2595.336 2595.300 2595.280 2594.970 2595.040 2595.110 2595.420 2595.440 2595.476
k0+050 2595.496 2595.460 2595.440 2595.130 2595.200 2595.270 2595.580 2595.600 2595.636
k0+060 2595.546 2595.510 2595.490 2595.180 2595.250 2595.320 2595.630 2595.650 2595.686
k0+070 2595.596 2595.560 2595.540 2595.230 2595.300 2595.370 2595.680 2595.700 2595.736
k0+080 2595.646 2595.610 2595.590 2595.280 2595.350 2595.420 2595.730 2595.750 2595.786
k0+090 2595.696 2595.660 2595.640 2595.330 2595.400 2595.470 2595.780 2595.800 2595.836
k0+100 2595.746 2595.710 2595.690 2595.380 2595.450 2595.520 2595.830 2595.850 2595.886
k0+110 2595.796 2595.760 2595.740 2595.430 2595.500 2595.570 2595.880 2595.900 2595.936
k0+120 2595.846 2595.810 2595.790 2595.480 2595.550 2595.620 2595.930 2595.950 2595.986
k0+130 2595.896 2595.860 2595.840 2595.530 2595.600 2595.670 2595.980 2596.000 2596.036
k0+140 2595.946 2595.910 2595.890 2595.580 2595.650 2595.720 2596.030 2596.050 2596.086
k0+150 2595.996 2595.960 2595.940 2595.630 2595.700 2595.770 2596.080 2596.100 2596.136
k0+160 2596.046 2596.010 2595.990 2595.680 2595.750 2595.820 2596.130 2596.150 2596.186
k0+170 2596.096 2596.060 2596.040 2595.730 2595.800 2595.870 2596.180 2596.200 2596.236
k0+180 2596.186 2596.150 2596.130 2595.820 2595.890 2595.960 2596.270 2596.290 2596.326
k0+186.5 2596.271 2596.235 2596.215 2595.905 2595.994 2596.096 2596.406 2596.426 2596.462
FORMATO CONTROL Y SUPERVICION DE NIVELES Y LOCALIZACIÓN PARA ENTREGA
FECHA:

PROYECTO: SALINAS CARRERA 17 CONSTRUCTORA: CONSTRUCTORA AR

CONTRATISTA: FSC INGENIEROS S.A.S

CONTIENE:

DISEÑO CAMPO CUMPLE/NO CUMPLE


ABSCISA
IZQUIERDA EJE DERECHA IZQUIERDA EJE DERECHA IZQUIERDA EJE DERECHA
cota cota cota cota cota cota cota cota cota
Empalme
k0+010
k0+020
k0+030
k0+040
k0+050
k0+060
k0+070
k0+080
k0+090
k0+100
k0+110
k0+120
k0+130
k0+140
k0+150
k0+160
k0+170
k0+180
k0+186.5

Topografo FSC Topografo AR

Ing. Residente FSC Ing. Residente AR