OBRAS DE CORAZÓN - PROYECTO MANTENIMIENTO MALLA VIAL URBANA


COMUNA 8 - BARRIO EL TRONCAL
CARRERA 8A ENTRE CALLES 44 Y 39 - 8K8AC44/39ET

rizontal Incremental Stationing Report.


INFORMACIÓN ELEVACIONES EXISTENTES Y PROPUESTAS
Alignment:
Desc: EXISTENTE DISEÑO Pendiente %
Station Section (m) (sardinel) Derecha Eje Izquierda (sardinel) Transversal Longitudinal
---------------------------------------------------------------------
K0+000 CALLE 44
K0+004
K0+005 6.00 963.374 963.158
K0+008.50 SUMIDERO 963.073
K0+09.55 963.145
K0+010 6.00 963.157 963.089 963.131 963.069 963.141
K0+010.70 6.00 963.276 Transición - Empalme
K0+011.20 SUMIDERO 963.078
K0+015 6.00 963.120 963.180 963.120 -2.00% -2.00%
K0+020 6.00 963.232 963.150 963.210 963.150 963.191 -2.00% -2.00%
K0+025 6.00 963.180 963.240 963.180 -2.00% -2.00%
K0+030 6.00 963.251 963.210 963.270 963.210 963.247 -2.00% -2.00%
K0+035 6.00 963.240 963.300 963.240 -2.00% -2.00%
K0+040 6.00 963.328 963.270 963.330 963.270 963.309 -2.00% -2.00%
K0+045 6.00 963.300 963.360 963.300 -2.00% -2.00% 0.60%
K0+050 6.00 963.360 963.330 963.390 963.330 963.356 -2.00% -2.00%
K0+055 6.00 963.360 963.420 963.360 -2.00% -2.00%
K0+060 6.00 963.417 963.390 963.450 963.390 963.583 -2.00% -2.00%
K0+065 6.00 963.420 963.480 963.420 -2.00% -2.00%
K0+070 6.00 963.471 963.450 963.510 963.450 963.622 -2.00% -2.00%
K0+075 6.00 963.480 963.540 963.480 CALLE 42 IZQUIERDA
K0+080 6.00 963.554 963.510 963.570 963.510 963.668 -2.00% -2.00%
K0+082.70 SUMIDERO 963.434
K0+085 6.00 963.578 963.638 963.578 -2.00% -2.00%
K0+086.00 SUMIDERO 963.515
K0+090 6.00 963.804 963.646 963.706 963.646 963.780 -2.00% -2.00%
K0+095 6.00 963.714 963.774 963.714 -2.00% -2.00%
1.35%
K0+100 6.00 963.790 963.782 963.842 963.782 963.821 -2.00% -2.00%
K0+105 6.00 963.850 963.910 963.850 -2.00% -2.00%
K0+110 6.00 964.005 963.918 963.978 963.918 963.991 -2.00% -2.00%
K0+113.40 6.00 963.964 964.024 963.964 -2.00% -2.00%
K0+115 6.00 963.986 964.046 963.986 -2.00% -2.00%
K0+120 6.00 964.096 964.054 964.114 964.054 964.066 -2.00% -2.00%
K0+125 6.00 964.074 964.134 964.074 CALLE 41
K0+130 6.00 964.094 964.154 964.094 -2.00% -2.00%
K0+134.20 SUMIDERO 963.931
K0+135 6.00 964.114 964.174 964.114 -2.00% -2.00%
K0+135.50 SUMIDERO 963.911
K0+140 6.00 964.114 964.134 964.194 964.134 964.111 -2.00% -2.00% 0.40%
K0+145 6.00 964.154 964.214 964.154 -2.00% -2.00%
K0+150 6.00 964.217 964.174 964.234 964.174 964.229 -2.00% -2.00%
K0+155 6.00 964.194 964.254 964.194 -2.00% -2.00%
K0+160 6.00 964.278 964.214 964.274 964.214 964.302 -2.00% -2.00%
K0+165 6.00 964.234 964.294 964.234 -2.00% -2.00%
K0+170 6.00 964.407 964.306 964.366 964.306 964.400 -2.00% -2.00%
K0+175 6.00 964.378 964.438 964.378 -2.00% -2.00%
1.44%
K0+180 6.00 964.498 964.450 964.510 964.450 964.487 -2.00% -2.00%
K0+185 6.00 964.522 964.582 964.522 -2.00% -2.00%
1
de
10/10/2022 2
Comuna 08-ET
8K8AC44-39modET

OBRAS DE CORAZÓN - PROYECTO MANTENIMIENTO MALLA VIAL URBANA


COMUNA 8 - BARRIO EL TRONCAL
CARRERA 8A ENTRE CALLES 44 Y 39 - 8K8AC44/39ET

rizontal Incremental Stationing Report.


INFORMACIÓN ELEVACIONES EXISTENTES Y PROPUESTAS
Alignment:
Desc: EXISTENTE DISEÑO Pendiente %
Station Section (m) (sardinel) Derecha Eje Izquierda (sardinel) Transversal Longitudinal
K0+190 6.00 964.642 964.594 964.654 964.594 964.625 -2.00% -2.00%
K0+195 6.00 964.649 964.709 964.649 -2.00% -2.00%
K0+200 6.00 964.822 964.704 964.764 964.704 964.707 -2.00% -2.00%
K0+205 6.00 964.759 964.819 964.759 -2.00% -2.00%
K0+210 6.00 964.791 964.814 964.874 964.814 964.755 -2.00% -2.00%
K0+215 6.00 964.869 964.929 964.869 -2.00% -2.00%
1.10%
K0+220 6.00 964.900 964.924 964.984 964.924 965.029 -2.00% -2.00%
K0+225 6.00 964.979 965.039 964.979 -2.00% -2.00%
K0+230 6.00 965.032 965.034 965.094 965.034 965.070 -2.00% -2.00%
K0+235 6.00 965.089 965.149 965.089 -2.00% -2.00%
K0+240 6.00 965.245 965.144 965.204 965.144 965.238 -2.00% -2.00%
K0+245 965.292 Transición - Empalme
K0+247.65 965.100
K0+248.60 965.175
K0+249.70 965.198
CALLE 39

CALCULÓ:
ALEXANDER RENGIFO C.
Coordinador topografía
CONSORCIO VIAL 2022
ALEXANDER RENGIFO C.
Coordinador topografía
CONSORCIO VIAL 2022