- 1.287 4.360 1.135 0.514 - 0.150 2.533 0.150 - - 0.665 0.112 - - - 0.372
00+050.000 ALIV TMC Ø=24" - 01 Proyectar - - 7.335
- 2.358 6.319 2.224 1.096 - 0.374 2.214 0.150 - - 0.579 0.112 5.499 - - 0.372
00+215.500 ALIV TMC Ø=24" - 02 Proyectar - - 6.520
- 2.280 6.579 2.306 1.269 - 0.374 2.575 0.150 - - 0.579 0.112 19.132 - - 0.372
00+741.000 ALIV TMC Ø=24" - 03 Proyectar - - 6.520
- 2.591 6.111 1.651 0.511 - 0.401 2.665 0.150 - - 0.660 0.112 0.419 - - 0.391
00+933.000 ALIV TMC Ø=24" - 04 Proyectar - - 7.335
- 2.415 3.759 1.415 0.666 - 0.379 1.830 0.150 - - 0.580 0.112 0.807 - - 0.391
01+097.000 ALIV TMC Ø=24" - 05 Proyectar - - 6.520
- 2.357 6.010 0.965 0.503 - 0.379 3.426 0.150 - - 0.657 0.112 15.759 - - 0.391
01+380.000 ALIV TMC Ø=24" - 06 Proyectar - - 7.335
- 2.499 7.848 3.182 2.595 - 0.390 2.606 0.150 - - 0.742 0.112 41.315 - - 0.372
02+389.500 ALIV TMC Ø=24" - 07 Proyectar - - 8.150
- 2.379 4.831 1.939 2.137 - 0.379 2.754 0.402 0.021 - 0.608 0.623 18.502 - - 1.774
02+705.900 ALIV TMC Ø=24" - 08 Proyectar - - 7.335
- 2.450 5.803 1.936 1.241 - 0.384 3.125 0.376 - - 0.538 0.270 91.528 - - 1.090
02+819.900 ALIV TMC Ø=24" - 09 Proyectar - - 6.520
- 2.351 7.264 1.721 0.997 - 0.374 4.352 0.222 - - 0.607 0.144 21.187 - - 0.531
04+364.400 ALIV TMC Ø=24" - 10 Proyectar - - 6.520
- 2.438 7.136 1.976 0.757 - 0.455 - 0.153 - - 0.578 0.118 25.672 - - 0.431
05+044.000 ALIV TMC Ø=24" - 11 Proyectar - - 6.520
- 2.669 0.626 2.397 1.066 - 0.401 0.386 0.688 - - 0.626 0.333 61.267 - - 1.013
05+261.500 ALIV TMC Ø=24" - 12 Proyectar - - 7.335
- 2.661 5.855 2.002 0.931 - 0.401 1.029 0.525 0.002 - 0.584 0.249 17.296 - - 1.133
05+557.700 ALIV TMC Ø=24" - 13 Proyectar - - 7.335
- 2.800 7.296 1.518 1.047 - 0.419 0.648 0.317 - - 0.714 0.853 17.938 - - 0.509
06+080.300 ALIV TMC Ø=24" - 14 Proyectar - - 8.150
- 2.701 4.801 3.033 1.027 - 0.407 1.331 0.981 0.020 - 0.632 0.322 11.992 - - 0.980
06+298.300 ALIV TMC Ø=24" - 15 Proyectar - - 7.335
- 2.428 7.446 3.544 1.820 - 0.379 - 0.150 - - 0.743 0.142 115.697 - - 0.417
06+745.400 ALIV TMC Ø=24" - 16 Proyectar - - 8.150
- 2.896 10.357 1.478 0.945 - 0.426 0.919 0.329 - - 1.011 1.148 27.795 - - 0.557
07+546.000 ALIV TMC Ø=24" - 17 Proyectar - - 11.410
- 2.418 0.886 1.908 3.119 - 0.401 4.762 0.350 - - 0.631 0.606 0.087 - - 1.808
08+001.000 ALIV TMC Ø=24" - 18 Proyectar - - 7.335
- 2.804 6.798 1.253 1.304 - 0.300 0.332 0.166 - - 0.542 0.142 17.684 - - 0.522
08+241.000 ALIV TMC Ø=24" - 19 Proyectar - - 6.520
- 3.007 6.919 1.607 1.268 - 0.300 0.412 0.326 - - 0.631 0.135 16.593 - - 0.486
08+399.400 ALIV TMC Ø=24" - 20 Proyectar - - 7.335
- 3.004 5.937 1.526 1.082 - 0.439 1.080 1.400 - - 0.631 0.134 4.475 - - 0.492
08+649.400 ALIV TMC Ø=24" - 21 Proyectar - - 7.335
- 2.912 5.524 1.501 0.794 - 0.426 2.249 0.289 - - 0.706 0.135 5.935 - - 0.492
08+869.400 ALIV TMC Ø=24" - 22 Proyectar - - 8.150
- 2.746 2.051 2.176 3.674 - 0.409 7.954 0.372 - - 0.875 0.703 1.424 - - 1.963
09+004.500 ALIV TMC Ø=24" - 23 Proyectar - - 9.780
- 2.981 7.831 4.844 7.125 - 0.426 - 0.450 - - 0.657 0.112 54.176 - - 0.372
09+277.500 ALIV TMC Ø=24" - 24 Proyectar - - 7.335
- 2.848 7.970 2.623 0.793 - 0.419 - 0.150 - - 0.573 0.073 63.401 - - 0.325
09+527.500 ALIV TMC Ø=24" - 25 Proyectar - - 6.520
- 2.456 12.093 4.434 3.426 - 0.384 - 0.450 - - 0.823 0.112 126.070 - - 0.372
09+665.300 ALIV TMC Ø=24" - 26 Proyectar - - 8.150
- 2.970 6.661 1.428 0.629 - 0.432 0.354 0.150 - - 0.578 0.115 13.389 - - 0.415
09+965.300 ALIV TMC Ø=24" - 27 Proyectar - - 6.520
- 2.672 8.171 3.793 7.097 - 0.401 - 0.150 - - 0.741 0.112 38.869 - - 0.372
10+225.300 ALIV TMC Ø=24" - 28 Proyectar - - 8.150
- 2.894 7.800 2.888 2.580 - 0.426 - 0.150 - - 0.573 0.170 17.371 - - 0.372
10+465.300 ALIV TMC Ø=24" - 29 Proyectar - - 6.520
- 2.890 8.487 4.137 4.570 - 0.384 - 0.150 - - 0.739 0.112 54.929 - - 0.372
11+185.000 ALIV TMC Ø=24" - 30 Proyectar - - 8.150
- 2.457 6.579 4.815 7.314 - 0.384 - 0.150 - - 0.577 0.112 50.244 - - 0.372
11+440.400 ALIV TMC Ø=24" - 31 Proyectar - - 6.520
- 2.351 8.099 1.417 0.618 - 0.374 0.810 0.150 - - 0.655 0.113 14.578 - - 0.398
11+568.700 ALIV TMC Ø=24" - 32 Proyectar - - 7.335
- 2.340 5.793 2.143 1.041 - 0.374 0.661 0.460 - - 0.545 0.122 22.668 - - 0.610
11+823.000 ALIV TMC Ø=24" - 33 Proyectar - - 6.520
- 2.454 5.962 2.060 1.078 - 0.384 - 0.150 - - 0.579 0.112 16.976 - - 0.372
12+093.000 ALIV TMC Ø=24" - 34 Proyectar - - 6.520
- 1.084 0.357 0.786 0.484 - 0.150 - 0.150 - - 0.905 0.112 - - - 0.372
12+779.000 ALIV TMC Ø=24" - 35 Proyectar - - 9.780
- 2.485 6.010 2.149 1.398 - 0.407 0.985 0.522 - - 0.630 0.249 11.306 - - 1.117
13+135.600 ALIV TMC Ø=24" - 36 Proyectar - - 7.335
- 2.932 7.928 1.660 1.058 - 0.425 1.244 0.268 - - 1.667 0.145 29.526 - - 0.543
13+680.600 ALIV TMC Ø=24" - 37 Proyectar - - 7.335
- 2.353 7.476 4.669 4.541 - 0.374 - 0.156 - - 0.575 0.112 75.780 - - 0.372
13+821.600 ALIV TMC Ø=24" - 38 Proyectar - - 6.520
- 2.969 7.974 3.325 0.689 - 0.458 - 0.153 - - 0.573 0.072 24.747 - - 0.335
14+221.600 ALIV TMC Ø=24" - 39 Proyectar - - 6.520
- 2.930 8.045 1.668 0.568 - 0.425 0.032 0.153 - - 0.573 0.120 75.029 - - 0.447
14+901.600 ALIV TMC Ø=24" - 40 Proyectar - - 6.520
- 2.438 9.077 3.827 1.508 - 0.455 - 0.153 - - 0.655 0.265 44.250 - - 0.372
15+941.600 ALIV TMC Ø=24" - 41 Proyectar - - 7.335
- 2.486 7.539 2.487 0.695 - 0.469 - 0.153 - - 0.660 0.067 48.439 - - 0.354
16+141.600 ALIV TMC Ø=24" - 42 Proyectar - - 7.335
- 2.359 4.461 1.183 0.836 - 0.374 1.157 0.495 0.007 - 0.549 0.269 10.327 - - 1.173
16+661.600 ALIV TMC Ø=24" - 43 Proyectar - - 6.520
- 2.362 3.197 1.405 1.112 - 0.374 2.435 0.241 - - 0.539 0.269 9.884 - - 1.173
16+906.600 ALIV TMC Ø=24" - 44 Proyectar - - 6.520
- 2.453 6.987 1.981 0.599 - 0.384 - 0.153 - - 0.577 0.092 43.272 - - 0.334
17+101.600 ALIV TMC Ø=24" - 45 Proyectar - - 6.520
- 2.666 7.173 3.207 1.362 - 0.401 - 0.155 - - 0.659 0.112 89.517 - - 0.372
17+224.600 ALIV TMC Ø=24" - 46 Proyectar - - 7.335
- 2.425 7.153 0.746 0.926 - 0.387 0.012 0.035 - - 0.632 0.108 86.336 - - 0.467
17+481.600 ALIV TMC Ø=24" - 47 Proyectar - - 7.335
- 2.382 1.700 1.115 0.452 - 0.379 4.290 0.118 - - 0.615 0.097 0.773 - - 0.374
17+981.600 ALIV TMC Ø=24" - 48 Proyectar - - 7.335
- 2.452 7.138 3.513 3.383 - 0.392 - 0.155 - - 0.658 0.113 37.545 - - 0.374
18+247.300 ALIV TMC Ø=24" - 49 Proyectar - - 7.335
- 2.778 3.092 1.891 2.757 - 0.413 4.044 0.363 - - 0.707 1.330 6.564 - - 1.774
18+486.300 ALIV TMC Ø=24" - 50 Proyectar - - 8.150
- 2.778 8.351 2.561 2.184 - 0.413 - 0.150 - - 0.740 0.112 30.026 - - 0.372
18+666.300 ALIV TMC Ø=24" - 51 Proyectar - - 8.150
- 2.166 0.017 1.111 2.115 - 0.442 9.539 0.004 - - 0.539 0.588 - - - 1.720
19+000.000 ALIV TMC Ø=24" - 52 Proyectar - - 6.520
- 2.290 6.698 5.472 6.782 - 0.383 - 0.153 - - 0.577 0.690 40.391 - - 0.372
19+392.000 ALIV TMC Ø=24" - 53 Proyectar - - 6.520
- 2.304 7.206 3.856 3.939 - 0.369 - 0.155 - - 0.661 0.112 54.259 - - 0.372
19+825.000 ALIV TMC Ø=24" - 54 Proyectar - - 7.335
- 2.266 6.655 3.782 3.004 - 0.369 - 0.524 - - 0.661 0.773 28.015 - - 0.372
20+155.000 ALIV TMC Ø=24" - 55 Proyectar - - 7.335
- 2.280 6.813 2.311 4.487 - 0.369 - 0.153 - - 0.577 0.112 42.399 - - 0.372
20+407.000 ALIV TMC Ø=24" - 56 Proyectar - - 6.520
- 2.284 7.035 1.650 0.585 - 0.369 0.083 0.153 - - 0.576 0.126 25.721 - - 0.358
20+668.000 ALIV TMC Ø=24" - 57 Proyectar - - 6.520
- 2.282 2.891 0.932 0.457 - 0.397 2.069 0.115 - - 0.634 0.097 0.235 - - 0.392
00+290.000 ALIV TMC Ø=24" - 58 Proyectar - - 8.150
- 2.445 6.885 1.589 0.725 - 0.485 0.037 0.156 - - 0.658 0.113 13.125 - - 0.400
00+560.000 ALIV TMC Ø=24" - 59 Proyectar - - 8.965
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
GOBIERNO REGIONAL DE CAJAMARCA
“CONSTRUCCIÓN DE LA CARRETERA CORTEGANA – EL CALVARIO – TRES CRUCES, DISTRITO DE CORTEGANA, PROVINCIA DE CELENDÍN, DEPARTAMENTO DE CAJAMARCA”
--------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
GOBIERNO REGIONAL DE CAJAMARCA
ALIVIADERO TMC Ø=24
ALIVIADERO TMC Ø=24" CAJA RECEPTORA - CABEZAL ALETAS ALIVIADERO TMC Ø=24" CAJA RECE
N° PROGRESIVA DESCRIPCIÓN N°
1 00+215.50 ALIV TMC Ø=24" - 02 1
2 00+741.00 ALIV TMC Ø=24" - 03 2
3 00+933.00 ALIV TMC Ø=24" - 04 3
4 01+097.00 ALIV TMC Ø=24" - 05 4
5 01+380.00 ALIV TMC Ø=24" - 06 5
6 02+389.50 ALIV TMC Ø=24" - 07 6
7 05+044.00 ALIV TMC Ø=24" - 11 7
8 06+745.40 ALIV TMC Ø=24" - 16 8
9 09+277.50 ALIV TMC Ø=24" - 24 9
10 09+527.50 ALIV TMC Ø=24" - 25 10
11 09+665.30 ALIV TMC Ø=24" - 26 11
12 09+965.30 ALIV TMC Ø=24" - 27 12
13 10+225.30 ALIV TMC Ø=24" - 28 13
14 10+465.30 ALIV TMC Ø=24" - 29 14
15 11+185.00 ALIV TMC Ø=24" - 30 15
16 11+440.40 ALIV TMC Ø=24" - 31 16
17 11+568.70 ALIV TMC Ø=24" - 32 17
18 12+093.00 ALIV TMC Ø=24" - 34 18
19 13+821.60 ALIV TMC Ø=24" - 38 19
20 14+221.60 ALIV TMC Ø=24" - 39 20
21 14+901.60 ALIV TMC Ø=24" - 40 21
22 15+941.60 ALIV TMC Ø=24" - 41 22
23 16+141.60 ALIV TMC Ø=24" - 42 23
24 17+101.60 ALIV TMC Ø=24" - 45 24
25 17+224.60 ALIV TMC Ø=24" - 46
26 18+247.30 ALIV TMC Ø=24" - 49
27 18+666.30 ALIV TMC Ø=24" - 51
28 19+392.00 ALIV TMC Ø=24" - 53
29 19+825.00 ALIV TMC Ø=24" - 54
30 20+155.00 ALIV TMC Ø=24" - 55
31 20+407.00 ALIV TMC Ø=24" - 56
32 20+668.00 ALIV TMC Ø=24" - 57
33 00+560.00 ALIV TMC Ø=24" - 59
DESCRIPCIÓN
ALIV TMC Ø=24" - 01
ALIV TMC Ø=24" - 35
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - CABEZAL SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 00+215.50 ALIV TMC Ø=24" - 02
LONG: 6.52 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 19.49 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.35
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.00
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.366 b = 1.00
Alcantarilla m2 Long. D - (2II)*I u = 0.39
6.52 0.60 - 7.824 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
Cabezal - Aletas m2 - - (I) La = 1.30
2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Canal de Salida m2 Lb2 AE - (I)*(II) Lc = 0.66
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 18.77 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.36 1.10 - 3.54 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
6.32 0.60 - 7.58 Ha = 0.40
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.50
Cabezal - Aletas m3 (AE))/2
2.22 2.07 - 4.60 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3 Bc
1.10 2.78 - 3.05 = 0.75
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 3.53 = 0.20
tc
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.35
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.37 1.10 - 0.56
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
2.21 0.60 - 2.66
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.31
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.01
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.58 0.60 - 0.69
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 31.08
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+ ((((u-0.2)^2)+(a'^2))^0.5 +
Caja Receptora m2 (I)+(II)+(III)
(u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4)) (((u-0.2)^2)+(a^2))^0.5)
2.04 4.94 3.57 10.55
(Lc+0.7)*(Hc+(2*0.4)+ 2(((da2+0.2)*0.4)+
2*((Le*0.4)+((La+0.25)*0.4))+
((((dc-tc)^2)+(AE*0.4)+ (Ha*(ta2+da2)/2))- (I)+(II)+(III)
Cabezal - Aletas m2 2*(La+Le)*(Ha+(Ha+(1.2/1.5)))
((Hc)^2))^0.5)) (2π(D^2)/4)
12.40 6.29 0.10 18.79
Canal de Salida m2 Lb2 AE HE ((III)*(II))+(2*(I)*(III))
1.50 2.78 0.30 1.73
INSTALACIÓN DE ALCANTARILLA
04.01.06 m Long. - - (I) 6.52
TMC Ø=24"
Alcantarilla TMC Ø = 24" 6.52 - - 6.52
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 4.71
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
Caja Receptora m3 (π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
1.79 0.35 0.08 2.05
(2*0.4*((da1+0.2)+(da2+0.2))/ ((dc+0.2)*(Lc+0.7)*(0.4))+
2*(ta1+ta2)*(La+Le)*(Ha+
2)+(0.4*Lf*(Lc+AE)/2)- (((Hc*(Lc+0.7))- (I)+(II)+(III)
Cabezal - Aletas m3 (Ha+(1.20/1.5)))/4
(0.7*0.15*(D+(AE-1.20))/2) ((π)*(D^2)/4))*(dc+tc)/2)
1.02 0.78 0.85 2.65
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) -
Kg/cm2+30%PG
- - - -
Caja Receptora m3 - - - -
- - - -
Cabezal - Aletas m3
0 0 - -
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) -
Cabezal - Aletas m3 - - - -
- - - -
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) -
Cabezal - Aletas m - - - -
- - - -
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) -
- - - -
Cabezal - Aletas m
- - - -
EMBOQUILLADO DE PIEDRA
CONCRETO
04.01.12 m3 (I) (II) (III) 1.03
F'C=140KG/CM2+60%PM(5"TAM.M
AX)
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.37 2.78 - 1.03
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 10.68
(0.15*b)+((π)*(D^2)/4) 0.2*(c+0.2+0.2)
Caja Receptora m2 ((b*c)+(2*a*c))+(2*b*(a')) (I)+(III)-(II)
+(0.9*0.3/2) +0.2*(b+(2*u))
5.69 0.57 0.81 5.92
(2*((La+Le)/2)*((da2)/2))+
Cabezal - Aletas m2 2*La*(Ha+(Hc-0.25))/2 (tc*Lc)+(Lc*Hc) (I)+(II)+(III)
((((D+0.4)+(AE))/2)*(Lf-0.2-dc))
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 10.68
SUPERFICIES VISIBLES
(0.15*b)+((π)*(D^2)/4) 0.2*(c+0.2+0.2)
Caja Receptora m2 ((b*c)+(2*a*c))+(2*b*(a')) (I)+(III)-(II)
+(0.9*0.3/2) +0.2*(b+(2*u))
5.69 0.57 0.81 5.92
(2*((La+Le)/2)*((da2)/2))+
2*La*(Ha+(Hc-0.25))/2 (tc*Lc)+(Lc*Hc) (I)+(II)+(III)
Cabezal - Aletas m2 ((((D+0.4)+(AE))/2)*(Lf-0.2-dc))
1.49 2.15 1.12 4.76
ELIMINACIÓN DE MATERIAL
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 (I) (II) (III) 15.24
30M)
EXCAVACIÓN NO
RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
18.77 3.53 - 15.24
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - CABEZAL SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 00+741.00 ALIV TMC Ø=24" - 03
LONG: 6.52 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 19.49 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.35
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.00
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.366 b = 1.00
Long. D - (2II)*I u = 0.39
Alcantarilla m2
6.52 0.60 - 7.824 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 19.62 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.28 1.10 - 3.42 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
6.58 0.60 - 7.89 Ha = 0.40
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.50
Cabezal - Aletas m3 (AE))/2
2.31 2.07 - 4.77 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
1.27 2.78 - 3.53 Bc = 0.75
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 3.96 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.35
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.37 1.10 - 0.56
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
2.58 0.60 - 3.09
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.31
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.01
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.58 0.60 - 0.69
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 31.08
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 20.62 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.50
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.15
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.434 b = 1.00
Long. D - (2II)*I u = 0.41
Alcantarilla m2
7.335 0.60 - 8.802 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.53
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.53 2.78 - 4.2534 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 16.06 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.59 1.10 - 3.89 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
6.11 0.60 - 7.33 Ha = 0.30
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.35
Cabezal - Aletas m3 (AE))/2
1.65 2.07 - 3.42 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
0.51 2.78 - 1.42 Bc = 0.73
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 4.11 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.33
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.40 1.10 - 0.60
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
2.67 0.60 - 3.20
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.31
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.10
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.66 0.60 - 0.79
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 31.04
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 19.60 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.35
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.05
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.366 b = 1.00
Long. D - (2II)*I u = 0.39
Alcantarilla m2
6.52 0.60 - 7.824 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.54
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.54 2.78 - 4.2812 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 12.91 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.42 1.10 - 3.62 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
3.76 0.60 - 4.51 Ha = 0.40
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.40
Cabezal - Aletas m3 (AE))/2
1.42 2.07 - 2.93 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
0.67 2.78 - 1.85 Bc = 0.74
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 3.08 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.34
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.38 1.10 - 0.57
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
1.83 0.60 - 2.20
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.31
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.01
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.58 0.60 - 0.70
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 31.19
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 20.58 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.30
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.05
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.366 b = 1.00
Long. D - (2II)*I u = 0.39
Alcantarilla m2
7.335 0.60 - 8.802 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.54
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.54 2.78 - 4.2812 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 14.14 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.36 1.10 - 3.54 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
6.01 0.60 - 7.21 Ha = 0.65
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.75
Cabezal - Aletas m3 (AE))/2
0.97 2.07 - 2.00 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
0.50 2.78 - 1.40 Bc = 0.77
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 4.99 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.37
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.38 1.10 - 0.57
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
3.43 0.60 - 4.11
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.31
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.10
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.66 0.60 - 0.79
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 35.17
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 21.52 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.45
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.05
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.434 b = 1.00
Long. D - (2II)*I u = 0.41
Alcantarilla m2
8.15 0.60 - 9.78 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 26.97 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.50 1.10 - 3.75 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
7.85 0.60 - 9.42 Ha = 0.40
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.40
Cabezal - Aletas m3 (AE))/2
3.18 2.07 - 6.59 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
2.60 2.78 - 7.21 Bc = 0.74
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 4.02 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.34
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.39 1.10 - 0.59
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
2.61 0.60 - 3.13
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.31
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.20
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.74 0.60 - 0.89
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 31.56
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 19.94 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.35
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.00
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.366 b = 1.00
Long. D - (2II)*I u = 0.39
Alcantarilla m2
6.52 0.60 - 7.824 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.66
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.66 2.78 - 4.6148 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 18.41 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.44 1.10 - 3.66 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
7.14 0.60 - 8.56 Ha = 0.45
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.60
Cabezal - Aletas m3 (AE))/2
1.98 2.07 - 4.09 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
0.76 2.78 - 2.10 Bc = 0.76
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 1.00 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.36
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.46 1.10 - 0.68
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.32
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.02
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.58 0.60 - 0.69
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.12 2.78 - 0.33
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 32.08
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 22.28 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.35
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.05
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.366 b = 1.00
Long. D - (2II)*I u = 0.39
Alcantarilla m2
8.15 0.60 - 9.78 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.80
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.8 2.78 - 5.004 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 24.97 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.43 1.10 - 3.64 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
7.45 0.60 - 8.94 Ha = 0.20
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.35
Cabezal - Aletas m3 (AE))/2
3.54 2.07 - 7.34 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
1.82 2.78 - 5.06 Bc = 0.73
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.88 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.33
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.38 1.10 - 0.57
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.31
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.29
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.74 0.60 - 0.89
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.14 2.78 - 0.39
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 28.65
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 20.61 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.60
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.25
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.502 b = 1.00
Long. D - (2II)*I u = 0.43
Alcantarilla m2
7.335 0.60 - 8.802 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 43.70 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.98 1.10 - 4.47 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
7.83 0.60 - 9.40 Ha = 0.40
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.50
Cabezal - Aletas m3 (AE))/2
4.84 2.07 - 10.03 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
7.13 2.78 - 19.81 Bc = 0.75
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 1.57 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.35
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.43 1.10 - 0.64
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.45 2.07 - 0.93
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.10
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.66 0.60 - 0.79
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 33.83
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 18.57 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.55
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.25
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.468 b = 1.00
Long. D - (2II)*I u = 0.42
Alcantarilla m2
6.52 0.60 - 7.824 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.13
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.13 2.78 - 3.1414 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 21.47 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.85 1.10 - 4.27 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
7.97 0.60 - 9.56 Ha = 0.70
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.85
Cabezal - Aletas m3 (AE))/2
2.62 2.07 - 5.43 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
0.79 2.78 - 2.20 Bc = 0.78
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.94 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.38
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.42 1.10 - 0.63
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.31
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 0.89
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.57 0.60 - 0.69
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.07 2.78 - 0.20
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 38.18
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 21.48 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.40
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.05
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.4 b = 1.00
Long. D - (2II)*I u = 0.40
Alcantarilla m2
8.15 0.60 - 9.78 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 36.90 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.46 1.10 - 3.68 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
12.09 0.60 - 14.51 Ha = 0.40
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.50
Cabezal - Aletas m3 (AE))/2
4.43 2.07 - 9.18 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
3.43 2.78 - 9.52 Bc = 0.75
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 1.51 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.35
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.38 1.10 - 0.58
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.45 2.07 - 0.93
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.30
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.82 0.60 - 0.99
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 31.63
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 19.63 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.60
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.30
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.502 b = 1.00
Long. D - (2II)*I u = 0.43
Alcantarilla m2
6.52 0.60 - 7.824 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 17.15 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.97 1.10 - 4.46 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
6.66 0.60 - 7.99 Ha = 0.20
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.45
Cabezal - Aletas m3 (AE))/2
1.43 2.07 - 2.96 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
0.63 2.78 - 1.75 Bc = 0.74
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 1.38 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.34
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.43 1.10 - 0.65
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
0.35 0.60 - 0.42
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.31
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.01
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.58 0.60 - 0.69
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.12 2.78 - 0.32
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 31.50
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 21.52 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.50
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.15
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.434 b = 1.00
Long. D - (2II)*I u = 0.41
Alcantarilla m2
8.15 0.60 - 9.78 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 41.39 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.67 1.10 - 4.01 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
8.17 0.60 - 9.81 Ha = 0.20
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.40
Cabezal - Aletas m3 (AE))/2
3.79 2.07 - 7.85 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
7.10 2.78 - 19.73 Bc = 0.74
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.91 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.34
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.40 1.10 - 0.60
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.31
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.20
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.74 0.60 - 0.89
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 29.88
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 19.63 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.60
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.25
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.502 b = 1.00
Long. D - (2II)*I u = 0.43
Alcantarilla m2
6.52 0.60 - 7.824 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 26.85 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.89 1.10 - 4.34 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
7.80 0.60 - 9.36 Ha = 0.60
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.75
Cabezal - Aletas m3 (AE))/2
2.89 2.07 - 5.98 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
2.58 2.78 - 7.17 Bc = 0.77
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.95 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.37
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.43 1.10 - 0.64
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.31
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.16
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.57 0.60 - 0.69
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.17 2.78 - 0.47
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 37.06
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 21.59 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.60
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.25
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.502 b = 1.00
Long. D - (2II)*I u = 0.43
Alcantarilla m2
8.15 0.60 - 9.78 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 35.79 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.89 1.10 - 4.34 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
8.49 0.60 - 10.18 Ha = 0.20
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.40
Cabezal - Aletas m3 (AE))/2
4.14 2.07 - 8.56 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
4.57 2.78 - 12.70 Bc = 0.74
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.89 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.34
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.38 1.10 - 0.58
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.31
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.20
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.74 0.60 - 0.89
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 31.01
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 19.53 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.40
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.05
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.4 b = 1.00
Long. D - (2II)*I u = 0.40
Alcantarilla m2
6.52 0.60 - 7.824 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 41.88 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.46 1.10 - 3.69 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
6.58 0.60 - 7.89 Ha = 0.45
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.60
Cabezal - Aletas m3 (AE))/2
4.82 2.07 - 9.97 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
7.31 2.78 - 20.33 Bc = 0.76
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.89 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.36
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.38 1.10 - 0.58
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.31
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.00
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.58 0.60 - 0.69
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 32.54
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 20.61 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.35
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.00
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.366 b = 1.00
Long. D - (2II)*I u = 0.39
Alcantarilla m2
7.335 0.60 - 8.802 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.55
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.55 2.78 - 4.309 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 17.90 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.35 1.10 - 3.53 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
8.10 0.60 - 9.72 Ha = 0.80
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 2.05
Cabezal - Aletas m3 (AE))/2
1.42 2.07 - 2.93 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
0.62 2.78 - 1.72 Bc = 0.81
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 1.84 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.41
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.37 1.10 - 0.56
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
0.81 0.60 - 0.97
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.31
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.10
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.66 0.60 - 0.79
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 37.71
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 19.53 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.40
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.05
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.4 b = 1.00
Long. D - (2II)*I u = 0.40
Alcantarilla m2
6.52 0.60 - 7.824 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 18.10 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.45 1.10 - 3.68 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
5.96 0.60 - 7.15 Ha = 0.25
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.40
Cabezal - Aletas m3 (AE))/2
2.06 2.07 - 4.26 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
1.08 2.78 - 3.00 Bc = 0.74
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.89 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.34
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.38 1.10 - 0.58
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.31
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.01
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.58 0.60 - 0.69
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 29.45
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 19.49 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.35
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.00
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.366 b = 1.00
Long. D - (2II)*I u = 0.39
Alcantarilla m2
6.52 0.60 - 7.824 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 34.79 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.35 1.10 - 3.53 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
7.48 0.60 - 8.97 Ha = 0.75
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.90
Cabezal - Aletas m3 (AE))/2
4.67 2.07 - 9.66 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
4.54 2.78 - 12.62 Bc = 0.79
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.88 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.39
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.37 1.10 - 0.56
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.16 2.07 - 0.32
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.00
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.58 0.60 - 0.69
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 36.63
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 18.59 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.55
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.30
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.468 b = 1.00
Long. D - (2II)*I u = 0.42
Alcantarilla m2
6.52 0.60 - 7.824 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.14
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.14 2.78 - 3.1692 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 22.82 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.97 1.10 - 4.45 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
7.97 0.60 - 9.57 Ha = 0.70
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.80
Cabezal - Aletas m3 (AE))/2
3.33 2.07 - 6.88 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
0.69 2.78 - 1.92 Bc = 0.78
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 1.00 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.38
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.46 1.10 - 0.69
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.32
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 0.89
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.57 0.60 - 0.69
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.07 2.78 - 0.20
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 38.41
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 20.21 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.55
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.30
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.468 b = 1.00
Long. D - (2II)*I u = 0.42
Alcantarilla m2
6.52 0.60 - 7.824 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.72
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.72 2.78 - 4.7816 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 19.08 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.93 1.10 - 4.40 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
8.05 0.60 - 9.65 Ha = 0.70
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.80
Cabezal - Aletas m3 (AE))/2
1.67 2.07 - 3.45 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
0.57 2.78 - 1.58 Bc = 0.78
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.99 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.38
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.43 1.10 - 0.64
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
0.03 0.60 - 0.04
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.32
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.02
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.57 0.60 - 0.69
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.12 2.78 - 0.33
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 38.76
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 20.51 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.40
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.00
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.4 b = 1.00
Long. D - (2II)*I u = 0.40
Alcantarilla m2
7.335 0.60 - 8.802 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 26.66 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.44 1.10 - 3.66 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
9.08 0.60 - 10.89 Ha = 0.90
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 2.05
Cabezal - Aletas m3 (AE))/2
3.83 2.07 - 7.92 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
1.51 2.78 - 4.19 Bc = 0.80
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 1.00 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.40
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.46 1.10 - 0.68
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.32
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.52
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.66 0.60 - 0.79
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.27 2.78 - 0.74
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 39.15
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 19.53 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.40
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.00
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.4 b = 1.00
Long. D - (2II)*I u = 0.40
Alcantarilla m2
7.335 0.60 - 8.802 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.15
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.15 2.78 - 3.197 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 19.86 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.49 1.10 - 3.73 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
7.54 0.60 - 9.05 Ha = 0.40
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.50
Cabezal - Aletas m3 (AE))/2
2.49 2.07 - 5.15 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
0.70 2.78 - 1.93 Bc = 0.75
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 1.02 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.35
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.47 1.10 - 0.70
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.32
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 0.98
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.66 0.60 - 0.79
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.07 2.78 - 0.19
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 31.06
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 18.89 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.40
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.05
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.4 b = 1.00
Long. D - (2II)*I u = 0.40
Alcantarilla m2
6.52 0.60 - 7.824 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.27
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.27 2.78 - 3.5306 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 17.83 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.45 1.10 - 3.68 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
6.99 0.60 - 8.38 Ha = 0.60
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.60
Cabezal - Aletas m3 (AE))/2
1.98 2.07 - 4.10 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
0.60 2.78 - 1.67 Bc = 0.76
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.89 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.36
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.38 1.10 - 0.58
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.32
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 0.95
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.58 0.60 - 0.69
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.09 2.78 - 0.26
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 34.32
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 20.54 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.50
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.15
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.434 b = 1.00
Long. D - (2II)*I u = 0.41
Alcantarilla m2
7.335 0.60 - 8.802 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 23.03 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.67 1.10 - 4.00 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
7.17 0.60 - 8.61 Ha = 0.20
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.35
Cabezal - Aletas m3 (AE))/2
3.21 2.07 - 6.64 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
1.36 2.78 - 3.79 Bc = 0.73
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.92 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.33
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.40 1.10 - 0.60
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.16 2.07 - 0.32
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.10
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.66 0.60 - 0.79
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 29.75
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 20.54 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.50
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.00
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.434 b = 1.00
Long. D - (2II)*I u = 0.41
Alcantarilla m2
7.335 0.60 - 8.802 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 28.92 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.45 1.10 - 3.68 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
7.14 0.60 - 8.57 Ha = 0.20
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.40
Cabezal - Aletas m3 (AE))/2
3.51 2.07 - 7.27 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
3.38 2.78 - 9.40 Bc = 0.74
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.91 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.34
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.39 1.10 - 0.59
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.16 2.07 - 0.32
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.10
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.66 0.60 - 0.79
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 28.81
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 21.55 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.55
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.20
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.468 b = 1.00
Long. D - (2II)*I u = 0.42
Alcantarilla m2
8.15 0.60 - 9.78 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 25.56 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.78 1.10 - 4.17 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
8.35 0.60 - 10.02 Ha = 0.25
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.40
Cabezal - Aletas m3 (AE))/2
2.56 2.07 - 5.30 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
2.18 2.78 - 6.07 Bc = 0.74
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.93 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.34
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.41 1.10 - 0.62
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.31
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.20
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.74 0.60 - 0.89
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 31.08
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 19.49 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.35
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.20
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.366 b = 1.00
Long. D - (2II)*I u = 0.39
Alcantarilla m2
6.52 0.60 - 7.824 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 41.65 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.29 1.10 - 3.44 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
6.70 0.60 - 8.04 Ha = 0.50
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.65
Cabezal - Aletas m3 (AE))/2
5.47 2.07 - 11.33 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
6.78 2.78 - 18.85 Bc = 0.76
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.89 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.36
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.38 1.10 - 0.57
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.32
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 2.61
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.58 0.60 - 0.69
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.69 2.78 - 1.92
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 34.19
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 20.47 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.35
((I)+(0.4)+(0.2))* ((II)
c b - a' = 0.95
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.366 b = 1.00
Long. D - (2II)*I u = 0.39
Alcantarilla m2
7.335 0.60 - 8.802 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 31.04 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.30 1.10 - 3.46 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
7.21 0.60 - 8.65 Ha = 0.30
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.45
Cabezal - Aletas m3 (AE))/2
3.86 2.07 - 7.98 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
3.94 2.78 - 10.95 Bc = 0.73
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.87 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.33
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.37 1.10 - 0.55
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.16 2.07 - 0.32
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.10
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.66 0.60 - 0.79
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 29.30
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 20.47 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.30
((I)+(0.4)+(0.2))* ((II)
c b - a' = 0.95
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.366 b = 1.00
Long. D - (2II)*I u = 0.39
Alcantarilla m2
7.335 0.60 - 8.802 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 27.56 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.27 1.10 - 3.40 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
6.66 0.60 - 7.99 Ha = 0.25
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.40
Cabezal - Aletas m3 (AE))/2
3.78 2.07 - 7.83 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
3.00 2.78 - 8.35 Bc = 0.74
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 1.64 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.34
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.37 1.10 - 0.55
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.52 2.07 - 1.08
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 2.94
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.66 0.60 - 0.79
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.77 2.78 - 2.15
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 28.37
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 19.49 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.35
((I)+(0.4)+(0.2))* ((II)
c b - a' = 0.95
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.366 b = 1.00
Long. D - (2II)*I u = 0.39
Alcantarilla m2
6.52 0.60 - 7.824 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 28.85 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.28 1.10 - 3.42 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
6.81 0.60 - 8.18 Ha = 0.55
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.65
Cabezal - Aletas m3 (AE))/2
2.31 2.07 - 4.78 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
4.49 2.78 - 12.47 Bc = 0.76
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.87 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.36
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.37 1.10 - 0.55
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
- 0.60 - -
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.32
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.00
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.58 0.60 - 0.69
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 33.04
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 19.80 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.35
((I)+(0.4)+(0.2))* ((II)
c b - a' = 0.95
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.366 b = 1.00
Long. D - (2II)*I u = 0.39
Alcantarilla m2
6.52 0.60 - 7.824 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.61
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.61 2.78 - 4.4758 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 16.91 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.28 1.10 - 3.43 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
7.04 0.60 - 8.44 Ha = 0.60
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.75
Cabezal - Aletas m3 (AE))/2
1.65 2.07 - 3.42 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
0.59 2.78 - 1.63 Bc = 0.77
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.97 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.37
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.37 1.10 - 0.55
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
0.08 0.60 - 0.10
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.32
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.04
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.58 0.60 - 0.69
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.13 2.78 - 0.35
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 34.01
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 19.49 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.35
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.00
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.366 b = 1.00
Long. D - (2II)*I u = 0.39
Alcantarilla m2
6.52 0.60 - 7.824 c = 1.10
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas m2 2(Le*(da1+0.20))
4.1335 - - 4.13 Lb2 = 1.50
Lb2 AE - (I)*(II) Lc = 0.66
Canal de Salida m2
1.5 2.78 - 4.17 Le = 1.75
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 18.77 Lf = 1.05
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) da1 = 0.36
Canal de Ingreso m3
- - - - da2 = 0.26
Corte/Entrada c - (I)*(II+0.20+0.20) ta1 = 0.19
Caja Receptora m3
2.36 1.10 - 3.54 ta2 = 0.16
Corte/Tubería D - (I)*(2II) D = 0.60
Alcantarilla m3
6.32 0.60 - 7.58 Ha = 0.40
((Lc+0.35+0.35)+
Corte/Salida - (I)*(II) Hc = 1.50
Cabezal - Aletas m3 (AE))/2
2.22 2.07 - 4.60 Hd = 0.40
Corte/Emb. Salida. AE - (I)*(II) He = 0.30
Canal de Salida m3
1.10 2.78 - 3.05 Bc = 0.75
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 3.53 tc = 0.20
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15) dc = 0.35
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.37 1.10 - 0.56
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
2.21 0.60 - 2.66
((Lc+0.35+0.35)+
Relleno/Salida - (I)*(II)
Cabezal - Aletas m3 (AE))/2
0.15 2.07 - 0.31
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.01
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.58 0.60 - 0.69
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 31.08
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
DETALLE DE EXCAVACIÓN
ELEVACIÓN FRONTAL
CORTE D-D
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 02+705.90 ALIV TMC Ø=24" - 08
LONG: 7.335 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 25.39 Lcb = -
REPLANTEO DE ESTRUCTURAS
Lcb D - (I)*(1.5*II) AE = 1.50
Canal de Ingreso m2 - - - - a = 1.45
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.00
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.40 b = 1.00
Long. D - (2II)*I u = 0.40
Alcantarilla m2
7.335 0.60 - 8.80 c = 1.10
Rc*Nc - - (I) Lb2 = 5.54
Muro Salida m2
4.875 - - 4.88 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
5.54 1.50 - 8.31 Mc = 3.00
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 17.42 Rc = 2.50
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.95
Canal de Ingreso m3
- - - - A° = 3.27
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 10.47
Caja Receptora m3
2.38 1.10 - 3.57
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
4.83 0.60 - 5.80
Corte/Salida Rc - (I)*(II)
Muro Salida m3
1.94 2.50 - 4.85
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
2.14 1.50 - 3.21
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 4.91
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.38 1.10 - 0.57
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
2.75 0.60 - 3.30
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.40 2.50 - 1.01
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
0.02 1.50 - 0.03
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.66
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.61 0.60 - 0.73
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.62 1.50 - 0.93
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 35.22
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.13 5.05 3.73 10.90
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
20.54 - - 20.54
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
5.54 1.50 0.30 3.77
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 7.34
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
7.34 - - 7.34
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.13
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
1.87 0.35 0.08 2.13
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 8.16
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
2.50 3.27 - 8.16
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 2.48
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
2.48 - - 2.48
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 2.58
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
1.29 2.00 - 2.58
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 2.50
Rc - - (I)
Muro Salida m
EMBOQUILLADO DE PIEDRA 2.50 - - 2.50
CONCRETO
04.01.12 m3 (I) (II) (III) 2.66
F'C=140KG/CM2+60%PM(5"TAM.M
AX) Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
1.77 1.50 - 2.66
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 16.38
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.80 0.57 0.81 6.04
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
10.63 0.28 - 10.34
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 16.38
SUPERFICIES VISIBLES
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.80 0.57 0.81 6.04
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
10.63 0.28 - 10.34
ELIMINACIÓN DE MATERIAL
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 (I) (II) (III) 12.51
30M) EXCAVACIÓN NO
RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
17.42 4.91 - 12.51
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 02+819.90 ALIV TMC Ø=24" - 09
LONG: 6.52 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 25.32 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.40
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.00
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.40 b = 1.00
Long. D - (2II)*I u = 0.40
Alcantarilla m2
6.52 0.60 - 7.82 c = 1.10
Rc*Nc - - (I) Lb2 = 2.40
Muro Salida m2
10.500 - - 10.50 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
2.4 1.50 - 3.60 Mc = 2.50
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 24.12 Rc = 6.00
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.75
Canal de Ingreso m3
- - - - A° = 2.57
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 9.24
Caja Receptora m3
2.45 1.10 - 3.68
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
5.80 0.60 - 6.96
Corte/Salida Rc - (I)*(II)
Muro Salida m3
1.94 6.00 - 11.62
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
1.24 1.50 - 1.86
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 6.58
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.38 1.10 - 0.58
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
3.13 0.60 - 3.75
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.38 6.00 - 2.26
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.05
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.54 0.60 - 0.65
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.27 1.50 - 0.41
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 55.79
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.10 4.99 3.65 10.75
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
43.16 - - 43.16
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
2.40 1.50 0.30 1.89
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 6.52
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
6.52 - - 6.52
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.11
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
1.85 0.35 0.08 2.11
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 15.41
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
6.00 2.57 - 15.41
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 5.04
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
5.04 - - 5.04
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 3.27
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
1.09 3.00 - 3.27
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 6.00
Rc - - (I)
Muro Salida m
6.00 - - 6.00
CONCRETO
04.01.12 m3 (I) (II) (III) 1.64
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
1.09 1.50 - 1.64
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 28.20
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.74 0.57 0.81 5.98
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
22.50 0.28 - 22.22
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 28.20
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.74 0.57 0.81 5.98
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 22.50 0.28 - 22.22
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 17.53
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
24.12 6.58 - 17.53
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 04+364.40 ALIV TMC Ø=24" - 10
LONG: 6.52 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 23.48 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.35
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.00
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.37 b = 1.00
Long. D - (2II)*I u = 0.39
Alcantarilla m2
6.52 0.60 - 7.82 c = 1.10
Rc*Nc - - (I) Lb2 = 2.19
Muro Salida m2
9.000 - - 9.00 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
2.19 1.50 - 3.29 Mc = 2.50
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 20.62 Rc = 4.00
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 2.25
Canal de Ingreso m3
- - - - A° = 2.57
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 9.24
Caja Receptora m3
2.35 1.10 - 3.53
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
7.26 0.60 - 8.72
Corte/Salida Rc - (I)*(II)
Muro Salida m3
1.72 4.00 - 6.88
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
1.00 1.50 - 1.50
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 6.67
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.37 1.10 - 0.56
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
4.35 0.60 - 5.22
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.22 4.00 - 0.89
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 0.94
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.61 0.60 - 0.73
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.14 1.50 - 0.22
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 39.08
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.04 4.94 3.57 10.55
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
26.77 - - 26.77
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
2.19 1.50 0.30 1.76
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 6.52
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
6.52 - - 6.52
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.05
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
1.79 0.35 0.08 2.05
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 10.27
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
4.00 2.57 - 10.27
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 3.36
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
3.36 - - 3.36
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 2.18
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
1.09 2.00 - 2.18
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 4.00
Rc - - (I)
Muro Salida m
4.00 - - 4.00
CONCRETO
04.01.12 m3 (I) (II) (III) 0.80
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.53 1.50 - 0.80
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 20.64
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.69 0.57 0.81 5.92
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
15.00 0.28 - 14.72
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 20.64
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.69 0.57 0.81 5.92
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 15.00 0.28 - 14.72
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 13.95
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
20.62 6.67 - 13.95
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 05+261.50 ALIV TMC Ø=24" - 12
LONG: 7.335 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 24.63 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.50
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.15
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.43 b = 1.00
Long. D - (2II)*I u = 0.41
Alcantarilla m2
7.335 0.60 - 8.80 c = 1.10
Rc*Nc - - (I) Lb2 = 2.43
Muro Salida m2
8.750 - - 8.75 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
2.43 1.50 - 3.65 Mc = 2.50
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 18.34 Rc = 5.00
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.75
Canal de Ingreso m3
- - - - A° = 2.57
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 9.24
Caja Receptora m3
2.67 1.10 - 4.00
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
0.63 0.60 - 0.75
Corte/Salida Rc - (I)*(II)
Muro Salida m3
2.40 5.00 - 11.99
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
1.07 1.50 - 1.60
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 4.50
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.40 1.10 - 0.60
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
0.39 0.60 - 0.46
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.69 5.00 - 3.44
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.25
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.63 0.60 - 0.75
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.33 1.50 - 0.50
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 50.05
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.29 5.87 4.03 12.18
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
35.97 - - 35.97
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
2.43 1.50 0.30 1.91
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 7.34
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
7.34 - - 7.34
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.31
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
1.99 0.41 0.09 2.31
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 12.84
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
5.00 2.57 - 12.84
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 4.20
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
4.20 - - 4.20
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 3.27
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
1.09 3.00 - 3.27
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 5.00
Rc - - (I)
Muro Salida m
5.00 - - 5.00
CONCRETO
04.01.12 m3 (I) (II) (III) 1.52
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
1.01 1.50 - 1.52
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 25.03
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.32 0.57 0.81 6.56
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
18.75 0.28 - 18.47
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 25.03
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.32 0.57 0.81 6.56
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 18.75 0.28 - 18.47
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 13.83
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
18.34 4.50 - 13.83
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 05+557.70 ALIV TMC Ø=24" - 13
LONG: 7.335 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 20.23 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.50
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.15
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.43 b = 1.00
Long. D - (2II)*I u = 0.41
Alcantarilla m2
7.335 0.60 - 8.80 c = 1.10
Rc*Nc - - (I) Lb2 = 2.41
Muro Salida m2
4.375 - - 4.38 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
2.41 1.50 - 3.62 Mc = 2.50
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 17.42 Rc = 2.50
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.75
Canal de Ingreso m3
- - - - A° = 2.57
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 9.24
Caja Receptora m3
2.66 1.10 - 3.99
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
5.86 0.60 - 7.03
Corte/Salida Rc - (I)*(II)
Muro Salida m3
2.00 2.50 - 5.01
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
0.93 1.50 - 1.40
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 3.15
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.40 1.10 - 0.60
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
1.03 0.60 - 1.23
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.53 2.50 - 1.31
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
0.00 1.50 - 0.00
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.07
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.58 0.60 - 0.70
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.25 1.50 - 0.37
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 32.06
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.29 5.87 4.03 12.18
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
17.98 - - 17.98
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
2.41 1.50 0.30 1.90
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 7.34
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
7.34 - - 7.34
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.31
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
1.99 0.41 0.09 2.31
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 6.42
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
2.50 2.57 - 6.42
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 2.10
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
2.10 - - 2.10
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 2.18
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
1.09 2.00 - 2.18
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 2.50
Rc - - (I)
Muro Salida m
2.50 - - 2.50
CONCRETO
04.01.12 m3 (I) (II) (III) 1.70
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
1.13 1.50 - 1.70
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 15.65
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.32 0.57 0.81 6.56
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
9.38 0.28 - 9.09
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 15.65
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.32 0.57 0.81 6.56
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 9.38 0.28 - 9.09
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 14.27
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
17.42 3.15 - 14.27
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 06+080.30 ALIV TMC Ø=24" - 14
LONG: 8.15 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 23.16 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.55
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.25
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.47 b = 1.00
Long. D - (2II)*I u = 0.42
Alcantarilla m2
8.15 0.60 - 9.78 c = 1.10
Rc*Nc - - (I) Lb2 = 2.11
Muro Salida m2
6.750 - - 6.75 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
2.11 1.50 - 3.17 Mc = 2.00
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 21.36 Rc = 4.50
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.50
Canal de Ingreso m3
- - - - A° = 1.93
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 7.95
Caja Receptora m3
2.80 1.10 - 4.20
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
7.30 0.60 - 8.76
Corte/Salida Rc - (I)*(II)
Muro Salida m3
1.52 4.50 - 6.83
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
1.05 1.50 - 1.57
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 2.83
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.42 1.10 - 0.63
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
0.65 0.60 - 0.78
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.32 4.50 - 1.43
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 2.14
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.71 0.60 - 0.86
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.85 1.50 - 1.28
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 42.50
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.41 6.43 4.25 13.10
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
27.68 - - 27.68
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
2.11 1.50 0.30 1.72
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 8.15
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
8.15 - - 8.15
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.45
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
2.09 0.45 0.09 2.45
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 8.70
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
4.50 1.93 - 8.70
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 3.11
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
3.11 - - 3.11
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 2.52
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
0.84 3.00 - 2.52
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 4.50
Rc - - (I)
Muro Salida m
4.50 - - 4.50
CONCRETO
04.01.12 m3 (I) (II) (III) 0.76
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.51 1.50 - 0.76
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 21.27
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.68 0.57 0.82 6.93
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
14.63 0.28 - 14.34
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 21.27
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.68 0.57 0.82 6.93
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 14.63 0.28 - 14.34
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 18.52
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
21.36 2.83 - 18.52
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 06+298.30 ALIV TMC Ø=24" - 15
LONG: 7.335 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 21.42 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.55
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.15
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.47 b = 1.00
Long. D - (2II)*I u = 0.42
Alcantarilla m2
7.335 0.60 - 8.80 c = 1.10
Rc*Nc - - (I) Lb2 = 2.60
Muro Salida m2
5.250 - - 5.25 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
2.6 1.50 - 3.90 Mc = 2.50
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 20.45 Rc = 3.00
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.75
Canal de Ingreso m3
- - - - A° = 2.57
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 9.24
Caja Receptora m3
2.70 1.10 - 4.05
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
4.80 0.60 - 5.76
Corte/Salida Rc - (I)*(II)
Muro Salida m3
3.03 3.00 - 9.10
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
1.03 1.50 - 1.54
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 5.18
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.41 1.10 - 0.61
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
1.33 0.60 - 1.60
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.98 3.00 - 2.94
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
0.02 1.50 - 0.03
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.24
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.63 0.60 - 0.76
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.32 1.50 - 0.48
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 35.97
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.35 5.92 4.10 12.38
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
21.58 - - 21.58
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
2.60 1.50 0.30 2.01
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 7.34
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
7.34 - - 7.34
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.37
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
2.05 0.41 0.09 2.37
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 7.70
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
3.00 2.57 - 7.70
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 2.52
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
2.52 - - 2.52
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 2.18
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
1.09 2.00 - 2.18
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 3.00
Rc - - (I)
Muro Salida m
3.00 - - 3.00
CONCRETO
04.01.12 m3 (I) (II) (III) 1.47
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.98 1.50 - 1.47
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 17.59
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.37 0.57 0.82 6.62
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
11.25 0.28 - 10.97
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 17.59
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.37 0.57 0.82 6.62
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 11.25 0.28 - 10.97
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 15.27
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
20.45 5.18 - 15.27
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 07+546.00 ALIV TMC Ø=24" - 17
LONG: 11.41 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 24.06 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.60
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.25
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.50 b = 1.00
Long. D - (2II)*I u = 0.43
Alcantarilla m2
11.41 0.60 - 13.69 c = 1.10
Rc*Nc - - (I) Lb2 = 2.08
Muro Salida m2
3.750 - - 3.75 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
2.08 1.50 - 3.12 Mc = 2.00
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 21.88 Rc = 2.50
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.50
Canal de Ingreso m3
- - - - A° = 1.93
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 7.95
Caja Receptora m3
2.90 1.10 - 4.34
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
10.36 0.60 - 12.43
Corte/Salida Rc - (I)*(II)
Muro Salida m3
1.48 2.50 - 3.70
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
0.95 1.50 - 1.42
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 2.56
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.43 1.10 - 0.64
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
0.92 0.60 - 1.10
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.33 2.50 - 0.82
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 2.94
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
1.01 0.60 - 1.21
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
1.15 1.50 - 1.72
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 30.38
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.48 6.49 4.33 13.30
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
15.38 - - 15.38
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
2.08 1.50 0.30 1.70
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 11.41
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
11.41 - - 11.41
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.51
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
2.15 0.45 0.09 2.51
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 4.84
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
2.50 1.93 - 4.84
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 1.73
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
1.73 - - 1.73
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 1.68
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
0.84 2.00 - 1.68
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 2.50
Rc - - (I)
Muro Salida m
2.50 - - 2.50
CONCRETO
04.01.12 m3 (I) (II) (III) 0.84
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.56 1.50 - 0.84
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 14.83
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.74 0.57 0.82 6.99
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
8.13 0.28 - 7.84
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 14.83
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.74 0.57 0.82 6.99
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 8.13 0.28 - 7.84
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 19.32
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
21.88 2.56 - 19.32
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 08+001.00 ALIV TMC Ø=24" - 18
LONG: 7.335 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 25.81 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.50
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.15
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.43 b = 1.00
Long. D - (2II)*I u = 0.41
Alcantarilla m2
7.335 0.60 - 8.80 c = 1.10
Rc*Nc - - (I) Lb2 = 5.80
Muro Salida m2
4.875 - - 4.88 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
5.8 1.50 - 8.70 Mc = 3.00
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 14.14 Rc = 2.50
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.95
Canal de Ingreso m3
- - - - A° = 3.27
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 10.47
Caja Receptora m3
2.42 1.10 - 3.63
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
0.89 0.60 - 1.06
Corte/Salida Rc - (I)*(II)
Muro Salida m3
1.91 2.50 - 4.77
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
3.12 1.50 - 4.68
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 7.19
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.40 1.10 - 0.60
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
4.76 0.60 - 5.71
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.35 2.50 - 0.88
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.67
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.63 0.60 - 0.76
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.61 1.50 - 0.91
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 36.65
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.29 5.87 4.03 12.18
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
20.54 - - 20.54
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
5.80 1.50 0.30 3.93
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 7.34
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
7.34 - - 7.34
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.31
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
1.99 0.41 0.09 2.31
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 8.16
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
2.50 3.27 - 8.16
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 2.48
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
2.48 - - 2.48
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 2.58
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
1.29 2.00 - 2.58
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 2.50
Rc - - (I)
Muro Salida m
2.50 - - 2.50
CONCRETO
04.01.12 m3 (I) (II) (III) 2.71
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
1.81 1.50 - 2.71
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 16.90
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.32 0.57 0.81 6.56
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
10.63 0.28 - 10.34
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 16.90
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.32 0.57 0.81 6.56
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 10.63 0.28 - 10.34
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 6.95
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
14.14 7.19 - 6.95
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 08+241.00 ALIV TMC Ø=24" - 19
LONG: 6.52 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 20.48 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.50
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.25
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.43 b = 1.00
Long. D - (2II)*I u = 0.41
Alcantarilla m2
6.52 0.60 - 7.82 c = 1.10
Rc*Nc - - (I) Lb2 = 2.15
Muro Salida m2
6.000 - - 6.00 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
2.15 1.50 - 3.23 Mc = 2.00
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 19.33 Rc = 4.00
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.50
Canal de Ingreso m3
- - - - A° = 1.93
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 7.95
Caja Receptora m3
2.80 1.10 - 4.21
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
6.80 0.60 - 8.16
Corte/Salida Rc - (I)*(II)
Muro Salida m3
1.25 4.00 - 5.01
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
1.30 1.50 - 1.96
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 1.51
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.30 1.10 - 0.45
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
0.33 0.60 - 0.40
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.17 4.00 - 0.66
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 0.86
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.54 0.60 - 0.65
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.14 1.50 - 0.21
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 39.25
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.35 6.38 4.17 12.90
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
24.61 - - 24.61
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
2.15 1.50 0.30 1.74
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 6.52
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
6.52 - - 6.52
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.40
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
2.04 0.45 0.09 2.40
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 7.74
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
4.00 1.93 - 7.74
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 2.76
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
2.76 - - 2.76
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 1.68
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
0.84 2.00 - 1.68
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 4.00
Rc - - (I)
Muro Salida m
4.00 - - 4.00
CONCRETO
04.01.12 m3 (I) (II) (III) 0.78
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.52 1.50 - 0.78
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 19.59
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.63 0.57 0.81 6.87
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
13.00 0.28 - 12.72
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 19.59
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.63 0.57 0.81 6.87
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 13.00 0.28 - 12.72
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 17.82
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
19.33 1.51 - 17.82
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 08+399.40 ALIV TMC Ø=24" - 20
LONG: 7.335 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 21.40 Lcb = -
REPLANTEO DE ESTRUCTURAS
Lcb D - (I)*(1.5*II) AE = 1.50
Canal de Ingreso m2 - - - - a = 1.65
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.30
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.54 b = 1.00
Long. D - (2II)*I u = 0.44
Alcantarilla m2
7.335 0.60 - 8.80 c = 1.10
Rc*Nc - - (I) Lb2 = 2.04
Muro Salida m2
6.000 - - 6.00 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
2.04 1.50 - 3.06 Mc = 2.00
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 21.14 Rc = 4.00
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.50
Canal de Ingreso m3
- - - - A° = 1.93
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 7.95
Caja Receptora m3
3.01 1.10 - 4.51
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
6.92 0.60 - 8.30
Corte/Salida Rc - (I)*(II)
Muro Salida m3
1.61 4.00 - 6.43
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
1.27 1.50 - 1.90
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 2.25
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.30 1.10 - 0.45
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
0.41 0.60 - 0.49
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.33 4.00 - 1.30
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 0.96
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.63 0.60 - 0.76
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.14 1.50 - 0.20
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 40.15
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.58 6.80 4.48 13.87
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
24.61 - - 24.61
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
2.04 1.50 0.30 1.67
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 7.34
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
7.34 - - 7.34
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.61
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
2.24 0.47 0.09 2.61
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 7.74
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
4.00 1.93 - 7.74
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 2.76
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
2.76 - - 2.76
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 1.68
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
0.84 2.00 - 1.68
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 4.00
Rc - - (I)
Muro Salida m
4.00 - - 4.00
CONCRETO
04.01.12 m3 (I) (II) (III) 0.73
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.49 1.50 - 0.73
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 19.92
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.95 0.57 0.83 7.20
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
13.00 0.28 - 12.72
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 19.92
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.95 0.57 0.83 7.20
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
13.00 0.28 - 12.72
ELIMINACIÓN DE MATERIAL
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 (I)
EXCAVACIÓN NO (II) (III) 18.89
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
21.14 2.25 - 18.89
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 08+649.40 ALIV TMC Ø=24" - 21
LONG: 7.335 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 19.13 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.65
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.25
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.54 b = 1.00
Long. D - (2II)*I u = 0.44
Alcantarilla m2
7.335 0.60 - 8.80 c = 1.10
Rc*Nc - - (I) Lb2 = 2.03
Muro Salida m2
3.750 - - 3.75 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
2.03 1.50 - 3.05 Mc = 2.00
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 17.07 Rc = 2.50
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.50
Canal de Ingreso m3
- - - - A° = 1.93
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 7.95
Caja Receptora m3
3.00 1.10 - 4.51
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
5.94 0.60 - 7.12
Corte/Salida Rc - (I)*(II)
Muro Salida m3
1.53 2.50 - 3.82
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
1.08 1.50 - 1.62
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 5.45
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.44 1.10 - 0.66
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
1.08 0.60 - 1.30
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
1.40 2.50 - 3.50
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 0.96
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.63 0.60 - 0.76
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.13 1.50 - 0.20
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 30.55
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.55 6.54 4.41 13.51
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
15.38 - - 15.38
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
2.03 1.50 0.30 1.67
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 7.34
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
7.34 - - 7.34
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.57
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
2.21 0.45 0.09 2.57
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 4.84
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
2.50 1.93 - 4.84
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 1.73
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
1.73 - - 1.73
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 1.68
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
0.84 2.00 - 1.68
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 2.50
Rc - - (I)
Muro Salida m
2.50 - - 2.50
CONCRETO
04.01.12 m3 (I) (II) (III) 0.74
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.49 1.50 - 0.74
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 14.89
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.79 0.57 0.83 7.05
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
8.13 0.28 - 7.84
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 14.89
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.79 0.57 0.83 7.05
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 8.13 0.28 - 7.84
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 11.61
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
17.07 5.45 - 11.61
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 08+869.40 ALIV TMC Ø=24" - 22
LONG: 8.15 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 22.34 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.60
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.25
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.50 b = 1.00
Long. D - (2II)*I u = 0.43
Alcantarilla m2
8.15 0.60 - 9.78 c = 1.10
Rc*Nc - - (I) Lb2 = 2.04
Muro Salida m2
6.000 - - 6.00 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
2.04 1.50 - 3.06 Mc = 2.00
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 18.19 Rc = 4.00
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.50
Canal de Ingreso m3
- - - - A° = 1.93
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 7.95
Caja Receptora m3
2.91 1.10 - 4.37
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
5.52 0.60 - 6.63
Corte/Salida Rc - (I)*(II)
Muro Salida m3
1.50 4.00 - 6.00
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
0.79 1.50 - 1.19
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 4.49
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.43 1.10 - 0.64
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
2.25 0.60 - 2.70
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.29 4.00 - 1.16
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.05
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.71 0.60 - 0.85
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.14 1.50 - 0.20
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 39.59
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.48 6.49 4.33 13.30
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
24.61 - - 24.61
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
2.04 1.50 0.30 1.67
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 8.15
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
8.15 - - 8.15
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.51
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
2.15 0.45 0.09 2.51
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 7.74
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
4.00 1.93 - 7.74
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 2.76
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
2.76 - - 2.76
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 1.68
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
0.84 2.00 - 1.68
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 4.00
Rc - - (I)
Muro Salida m
4.00 - - 4.00
CONCRETO
04.01.12 m3 (I) (II) (III) 0.74
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.49 1.50 - 0.74
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 19.71
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.74 0.57 0.82 6.99
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
13.00 0.28 - 12.72
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 19.71
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.74 0.57 0.82 6.99
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 13.00 0.28 - 12.72
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 13.70
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
18.19 4.49 - 13.70
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 09+004.50 ALIV TMC Ø=24" - 23
LONG: 9.78 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 35.91 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.50
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.20
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.43 b = 1.00
Long. D - (2II)*I u = 0.41
Alcantarilla m2
9.78 0.60 - 11.74 c = 1.10
Rc*Nc - - (I) Lb2 = 6.49
Muro Salida m2
11.000 - - 11.00 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
6.49 1.50 - 9.74 Mc = 3.50
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 22.97 Rc = 5.00
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 2.20
Canal de Ingreso m3
- - - - A° = 4.14
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 11.76
Caja Receptora m3
2.75 1.10 - 4.12
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
2.05 0.60 - 2.46
Corte/Salida Rc - (I)*(II)
Muro Salida m3
2.18 5.00 - 10.88
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
3.67 1.50 - 5.51
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 12.02
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.41 1.10 - 0.61
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
7.95 0.60 - 9.54
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.37 5.00 - 1.86
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 2.10
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.88 0.60 - 1.05
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.70 1.50 - 1.05
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 63.17
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.32 6.12 4.10 12.54
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
46.29 - - 46.29
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
6.49 1.50 0.30 4.34
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 9.78
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
9.78 - - 9.78
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.35
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
2.01 0.43 0.09 2.35
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 20.69
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
5.00 4.14 - 20.69
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 5.70
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
5.70 - - 5.70
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 4.62
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
1.54 3.00 - 4.62
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 5.00
Rc - - (I)
Muro Salida m
5.00 - - 5.00
CONCRETO
04.01.12 m3 (I) (II) (III) 2.94
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
1.96 1.50 - 2.94
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 30.18
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.47 0.57 0.81 6.72
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
23.75 0.28 - 23.47
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 30.18
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.47 0.57 0.81 6.72
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 23.75 0.28 - 23.47
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 10.95
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
22.97 12.02 - 10.95
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 11+823.00 ALIV TMC Ø=24" - 33
LONG: 6.52 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 18.94 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.30
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.00
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.37 b = 1.00
Long. D - (2II)*I u = 0.39
Alcantarilla m2
6.52 0.60 - 7.82 c = 1.10
Rc*Nc - - (I) Lb2 = 2.25
Muro Salida m2
4.375 - - 4.38 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
2.25 1.50 - 3.38 Mc = 2.50
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 17.38 Rc = 2.50
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.75
Canal de Ingreso m3
- - - - A° = 2.57
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 9.24
Caja Receptora m3
2.34 1.10 - 3.51
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
5.79 0.60 - 6.95
Corte/Salida Rc - (I)*(II)
Muro Salida m3
2.14 2.50 - 5.36
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
1.04 1.50 - 1.56
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 2.50
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.37 1.10 - 0.56
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
0.66 0.60 - 0.79
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.46 2.50 - 1.15
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 0.84
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.55 0.60 - 0.65
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.12 1.50 - 0.18
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 30.17
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.01 4.88 3.50 10.39
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
17.98 - - 17.98
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
2.25 1.50 0.30 1.80
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 6.52
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
6.52 - - 6.52
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.03
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
1.77 0.35 0.08 2.03
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 6.42
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
2.50 2.57 - 6.42
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 2.10
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
2.10 - - 2.10
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 2.18
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
1.09 2.00 - 2.18
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 2.50
Rc - - (I)
Muro Salida m
2.50 - - 2.50
CONCRETO
04.01.12 m3 (I) (II) (III) 0.92
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.61 1.50 - 0.92
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 14.96
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.63 0.57 0.81 5.87
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
9.38 0.28 - 9.09
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 14.96
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.63 0.57 0.81 5.87
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 9.38 0.28 - 9.09
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 14.88
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
17.38 2.50 - 14.88
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 13+135.60 ALIV TMC Ø=24" - 36
LONG: 7.335 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 21.94 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.40
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.05
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.40 b = 1.00
Long. D - (2II)*I u = 0.40
Alcantarilla m2
7.335 0.60 - 8.80 c = 1.10
Rc*Nc - - (I) Lb2 = 2.41
Muro Salida m2
6.125 - - 6.13 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
2.41 1.50 - 3.62 Mc = 2.50
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 20.56 Rc = 3.50
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.75
Canal de Ingreso m3
- - - - A° = 2.57
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 9.24
Caja Receptora m3
2.49 1.10 - 3.73
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
6.01 0.60 - 7.21
Corte/Salida Rc - (I)*(II)
Muro Salida m3
2.15 3.50 - 7.52
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
1.40 1.50 - 2.10
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 3.62
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.41 1.10 - 0.61
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
0.99 0.60 - 1.18
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.52 3.50 - 1.83
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.13
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.63 0.60 - 0.76
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.25 1.50 - 0.37
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 38.18
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.13 5.25 3.72 11.10
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
25.18 - - 25.18
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
2.41 1.50 0.30 1.90
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 7.34
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
7.34 - - 7.34
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.15
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
1.87 0.37 0.08 2.15
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 8.99
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
3.50 2.57 - 8.99
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 2.94
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
2.94 - - 2.94
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 2.18
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
1.09 2.00 - 2.18
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 3.50
Rc - - (I)
Muro Salida m
3.50 - - 3.50
CONCRETO
04.01.12 m3 (I) (II) (III) 1.68
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
1.12 1.50 - 1.68
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 18.98
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.90 0.57 0.81 6.14
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
13.13 0.28 - 12.84
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 18.98
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.90 0.57 0.81 6.14
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 13.13 0.28 - 12.84
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 16.94
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
20.56 3.62 - 16.94
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 13+680.60 ALIV TMC Ø=24" - 37
LONG: 7.335 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 19.98 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.55
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.30
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.47 b = 1.00
Long. D - (2II)*I u = 0.42
Alcantarilla m2
7.335 0.60 - 8.80 c = 1.10
Rc*Nc - - (I) Lb2 = 2.22
Muro Salida m2
4.375 - - 4.38 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
2.22 1.50 - 3.33 Mc = 2.50
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 19.65 Rc = 2.50
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.75
Canal de Ingreso m3
- - - - A° = 2.57
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 9.24
Caja Receptora m3
2.93 1.10 - 4.40
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
7.93 0.60 - 9.51
Corte/Salida Rc - (I)*(II)
Muro Salida m3
1.66 2.50 - 4.15
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
1.06 1.50 - 1.59
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 2.80
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.43 1.10 - 0.64
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
1.24 0.60 - 1.49
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.27 2.50 - 0.67
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 2.22
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
1.67 0.60 - 2.00
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.15 1.50 - 0.22
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 33.23
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.45 6.69 4.33 13.46
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
17.98 - - 17.98
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
2.22 1.50 0.30 1.78
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 7.34
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
7.34 - - 7.34
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.50
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
2.12 0.47 0.09 2.50
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 6.42
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
2.50 2.57 - 6.42
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 2.10
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
2.10 - - 2.10
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 2.18
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
1.09 2.00 - 2.18
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 2.50
Rc - - (I)
Muro Salida m
2.50 - - 2.50
CONCRETO
04.01.12 m3 (I) (II) (III) 0.81
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.54 1.50 - 0.81
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 16.18
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.84 0.57 0.82 7.09
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
9.38 0.28 - 9.09
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 16.18
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.84 0.57 0.82 7.09
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 9.38 0.28 - 9.09
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 16.85
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
19.65 2.80 - 16.85
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 16+661.60 ALIV TMC Ø=24" - 43
LONG: 6.52 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 20.06 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.35
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.00
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.37 b = 1.00
Long. D - (2II)*I u = 0.39
Alcantarilla m2
6.52 0.60 - 7.82 c = 1.10
Rc*Nc - - (I) Lb2 = 2.41
Muro Salida m2
5.250 - - 5.25 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
2.41 1.50 - 3.62 Mc = 2.50
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 13.69 Rc = 3.00
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.75
Canal de Ingreso m3
- - - - A° = 2.57
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 9.24
Caja Receptora m3
2.36 1.10 - 3.54
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
4.46 0.60 - 5.35
Corte/Salida Rc - (I)*(II)
Muro Salida m3
1.18 3.00 - 3.55
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
0.84 1.50 - 1.25
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 3.44
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.37 1.10 - 0.56
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
1.16 0.60 - 1.39
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.50 3.00 - 1.49
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
0.01 1.50 - 0.01
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.06
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.55 0.60 - 0.66
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.27 1.50 - 0.40
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 34.02
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.04 4.94 3.57 10.55
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
21.58 - - 21.58
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
2.41 1.50 0.30 1.90
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 6.52
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
6.52 - - 6.52
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.05
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
1.79 0.35 0.08 2.05
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 7.70
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
3.00 2.57 - 7.70
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 2.52
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
2.52 - - 2.52
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 2.18
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
1.09 2.00 - 2.18
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 3.00
Rc - - (I)
Muro Salida m
3.00 - - 3.00
CONCRETO
04.01.12 m3 (I) (II) (III) 1.76
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
1.17 1.50 - 1.76
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 16.89
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.69 0.57 0.81 5.92
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
11.25 0.28 - 10.97
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 16.89
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.69 0.57 0.81 5.92
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 11.25 0.28 - 10.97
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 10.25
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
13.69 3.44 - 10.25
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 16+906.60 ALIV TMC Ø=24" - 44
LONG: 6.52 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 19.18 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.35
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.00
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.37 b = 1.00
Long. D - (2II)*I u = 0.39
Alcantarilla m2
6.52 0.60 - 7.82 c = 1.10
Rc*Nc - - (I) Lb2 = 2.41
Muro Salida m2
4.375 - - 4.38 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
2.41 1.50 - 3.62 Mc = 2.50
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 12.56 Rc = 2.50
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.75
Canal de Ingreso m3
- - - - A° = 2.57
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 9.24
Caja Receptora m3
2.36 1.10 - 3.54
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
3.20 0.60 - 3.84
Corte/Salida Rc - (I)*(II)
Muro Salida m3
1.41 2.50 - 3.51
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
1.11 1.50 - 1.67
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 4.09
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.37 1.10 - 0.56
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
2.44 0.60 - 2.92
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.24 2.50 - 0.60
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.05
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.54 0.60 - 0.65
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.27 1.50 - 0.40
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 30.43
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.04 4.94 3.57 10.55
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
17.98 - - 17.98
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
2.41 1.50 0.30 1.90
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 6.52
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
6.52 - - 6.52
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.05
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
1.79 0.35 0.08 2.05
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 6.42
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
2.50 2.57 - 6.42
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 2.10
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
2.10 - - 2.10
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 2.18
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
1.09 2.00 - 2.18
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 2.50
Rc - - (I)
Muro Salida m
2.50 - - 2.50
CONCRETO
04.01.12 m3 (I) (II) (III) 1.76
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
1.17 1.50 - 1.76
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 15.02
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.69 0.57 0.81 5.92
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
9.38 0.28 - 9.09
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 15.02
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.69 0.57 0.81 5.92
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 9.38 0.28 - 9.09
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 8.47
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
12.56 4.09 - 8.47
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 17+481.60 ALIV TMC Ø=24" - 47
LONG: 7.335 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 18.29 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.40
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.00
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.40 b = 1.00
Long. D - (2II)*I u = 0.40
Alcantarilla m2
7.335 0.60 - 8.80 c = 1.10
Rc*Nc - - (I) Lb2 = 1.89
Muro Salida m2
3.250 - - 3.25 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
1.89 1.50 - 2.84 Mc = 1.50
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 15.48 Rc = 2.50
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.30
Canal de Ingreso m3
- - - - A° = 1.45
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 6.73
Caja Receptora m3
2.43 1.10 - 3.64
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
7.15 0.60 - 8.58
Corte/Salida Rc - (I)*(II)
Muro Salida m3
0.75 2.50 - 1.87
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
0.93 1.50 - 1.39
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.68
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.39 1.10 - 0.58
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
0.01 0.60 - 0.01
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.04 2.50 - 0.09
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 0.92
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.63 0.60 - 0.76
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 1.50 - 0.16
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 25.15
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.10 4.99 3.65 10.75
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
12.83 - - 12.83
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
1.89 1.50 0.30 1.58
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 7.34
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
7.34 - - 7.34
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.11
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
1.85 0.35 0.08 2.11
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 3.62
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
2.50 1.45 - 3.62
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 1.35
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
1.35 - - 1.35
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 1.26
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
0.63 2.00 - 1.26
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 2.50
Rc - - (I)
Muro Salida m
2.50 - - 2.50
CONCRETO
04.01.12 m3 (I) (II) (III) 0.70
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.47 1.50 - 0.70
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 12.57
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.74 0.57 0.81 5.98
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
6.88 0.28 - 6.59
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 12.57
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.74 0.57 0.81 5.98
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 6.88 0.28 - 6.59
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 14.79
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
15.48 0.68 - 14.79
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 17+981.60 ALIV TMC Ø=24" - 48
LONG: 7.335 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 19.08 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.40
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.00
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.40 b = 1.00
Long. D - (2II)*I u = 0.40
Alcantarilla m2
7.335 0.60 - 8.80 c = 1.10
Rc*Nc - - (I) Lb2 = 1.67
Muro Salida m2
4.375 - - 4.38 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
1.67 1.50 - 2.51 Mc = 2.50
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 9.08 Rc = 2.50
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.75
Canal de Ingreso m3
- - - - A° = 2.57
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 9.24
Caja Receptora m3
2.38 1.10 - 3.57
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
1.70 0.60 - 2.04
Corte/Salida Rc - (I)*(II)
Muro Salida m3
1.12 2.50 - 2.79
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
0.45 1.50 - 0.68
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 6.01
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.38 1.10 - 0.57
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
4.29 0.60 - 5.15
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.12 2.50 - 0.30
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 0.88
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.62 0.60 - 0.74
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.10 1.50 - 0.15
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 30.18
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.10 4.99 3.65 10.75
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
17.98 - - 17.98
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
1.67 1.50 0.30 1.45
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 7.34
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
7.34 - - 7.34
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.11
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
1.85 0.35 0.08 2.11
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 6.42
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
2.50 2.57 - 6.42
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 2.10
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
2.10 - - 2.10
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 2.18
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
1.09 2.00 - 2.18
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 2.50
Rc - - (I)
Muro Salida m
2.50 - - 2.50
CONCRETO
04.01.12 m3 (I) (II) (III) 0.56
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.37 1.50 - 0.56
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 15.07
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.74 0.57 0.81 5.98
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
9.38 0.28 - 9.09
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 15.07
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.74 0.57 0.81 5.98
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 9.38 0.28 - 9.09
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 3.07
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
9.08 6.01 - 3.07
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 18+486.30 ALIV TMC Ø=24" - 50
LONG: 8.15 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 29.73 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.55
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.20
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.47 b = 1.00
Long. D - (2II)*I u = 0.42
Alcantarilla m2
8.15 0.60 - 9.78 c = 1.10
Rc*Nc - - (I) Lb2 = 5.79
Muro Salida m2
7.800 - - 7.80 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
5.79 1.50 - 8.69 Mc = 3.00
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 19.58 Rc = 4.00
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 1.95
Canal de Ingreso m3
- - - - A° = 3.27
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 10.47
Caja Receptora m3
2.78 1.10 - 4.17
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
3.09 0.60 - 3.71
Corte/Salida Rc - (I)*(II)
Muro Salida m3
1.89 4.00 - 7.56
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
2.76 1.50 - 4.14
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 6.92
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.41 1.10 - 0.62
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
4.04 0.60 - 4.85
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.36 4.00 - 1.45
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 2.84
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.71 0.60 - 0.85
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
1.33 1.50 - 2.00
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 49.53
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.38 6.18 4.18 12.74
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
32.87 - - 32.87
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
5.79 1.50 0.30 3.92
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 8.15
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
8.15 - - 8.15
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.41
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
2.07 0.43 0.09 2.41
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 13.06
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
4.00 3.27 - 13.06
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 3.96
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
3.96 - - 3.96
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 2.58
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
1.29 2.00 - 2.58
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 4.00
Rc - - (I)
Muro Salida m
4.00 - - 4.00
CONCRETO
04.01.12 m3 (I) (II) (III) 2.66
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
1.77 1.50 - 2.66
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 23.49
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.53 0.57 0.82 6.78
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
17.00 0.28 - 16.72
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 23.49
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.53 0.57 0.82 6.78
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 17.00 0.28 - 16.72
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 12.65
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
19.58 6.92 - 12.65
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 19+000.00 ALIV TMC Ø=24" - 52
LONG: 6.52 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 28.84 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 1.50
- - - - a = 1.55
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.20
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.47 b = 1.00
Long. D - (2II)*I u = 0.42
Alcantarilla m2
6.52 0.60 - 7.82 c = 1.10
Rc*Nc - - (I) Lb2 = 5.83
Muro Salida m2
8.800 - - 8.80 D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
5.83 1.50 - 8.75 Mc = 3.50
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 10.89 Rc = 4.00
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = 2.20
Canal de Ingreso m3
- - - - A° = 4.14
Corte/Entrada c - (I)*(II+0.20+0.20) P° = 11.76
Caja Receptora m3
2.17 1.10 - 3.25
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
0.02 0.60 - 0.02
Corte/Salida Rc - (I)*(II)
Muro Salida m3
1.11 4.00 - 4.44
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
2.12 1.50 - 3.17
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 12.13
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.44 1.10 - 0.66
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
9.54 0.60 - 11.45
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.00 4.00 - 0.02
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.53
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.54 0.60 - 0.65
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.59 1.50 - 0.88
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 53.72
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.38 6.18 4.18 12.74
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
37.03 - - 37.03
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
5.83 1.50 0.30 3.95
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 6.52
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
6.52 - - 6.52
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.41
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
2.07 0.43 0.09 2.41
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) 16.55
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
4.00 4.14 - 16.55
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) 4.56
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
4.56 - - 4.56
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) 3.08
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
1.54 2.00 - 3.08
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) 4.00
Rc - - (I)
Muro Salida m
4.00 - - 4.00
CONCRETO
04.01.12 m3 (I) (II) (III) 2.58
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
1.72 1.50 - 2.58
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 25.49
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.53 0.57 0.82 6.78
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
19.00 0.28 - 18.72
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 25.49
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
6.53 0.57 0.82 6.78
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL 19.00 0.28 - 18.72
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) -1.24
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
10.89 12.13 - -1.24
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CAJA DE ENTRADA - MURO SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 00+290.00 ALIV TMC Ø=24" - 02
LONG: 6.52 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y
04.01.01 m2 (I) (II) (III) 15.36 Lcb = -
REPLANTEO DE ESTRUCTURAS
Canal de Ingreso m2 Lcb D - (I)*(1.5*II) AE = 2.78
- - - - a = 1.35
((I)+(0.4)+(0.2))* ((II)
c b - a' = 1.00
Caja Receptora m2 +(2*u)+(0.2))
1.10 1.00 - 3.37 b = 1.00
Long. D - (2II)*I u = 0.39
Alcantarilla m2
6.52 0.60 - 7.82 c = 1.10
Rc*Nc - - (I) Lb2 = 1.50
Muro Salida m2
- - - - D = 0.60
Lb2 AE - (I)*(II) He = 0.30
Canal de Salida m2
1.5 2.78 - 4.17 Mc = -
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 14.17 Rc = -
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. D - (I)*(II+0.15+0.15) Nc = -
Canal de Ingreso m3
- - - - A° = -
Corte/Entrada c - (I)*(II+0.20+0.20) P° = -
Caja Receptora m3
2.36 1.10 - 3.54
Corte/Tubería D - (I)*(2II)
Alcantarilla m3
6.32 0.60 - 7.58
Corte/Salida Rc - (I)*(II)
Muro Salida m3
2.22 0.00 - -
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
1.10 2.78 - 3.05
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 3.22
Relleno/Emb. Entr. D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Relleno/Entrada c - (I)*(II+0.20+0.20)
Caja Receptora m3
0.37 1.10 - 0.56
Relleno/Tubería D - (I)*(2II)
Alcantarilla m3
2.21 0.60 - 2.66
Relleno/Salida Rc - (I)*(II)
Muro Salida m3
0.15 0.00 - -
Relleno/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
- - - -
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.01
AFIRMADO
Mat. Afir. / Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Mat. Afir. / Tubería D - (I)*(2II)
Alcantarilla m3
0.58 0.60 - 0.69
Mat. Afir. / Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.11 2.78 - 0.31
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 12.28
-ALCANTARILLAS
Lcb (1.5*D) HE ((III)*(II))+(2*(I)*(III))
Canal de Ingreso m2
- - - -
2*(((a+a')*((0.2+u)/2))+(b*0.15)+ 4*((b*a')-(Vt*(Hz+0.15)))+
((((u-0.2)^2)+(a'^2))^0.5 + (((u-0.2)^2)+(a^2))^0.5)
(I)+(II)+(III)
Caja Receptora m2 (u*(0.3+0.15))) (c*(a+a'))-(2*(π(D^2)/4))
2.04 4.94 3.57 10.55
(P°-Nc-0.3)*Rc - - (I)
Muro Salida m2
- - - -
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
1.50 2.78 0.30 1.73
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 6.52
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
6.52 - - 6.52
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I) (II) (III) 2.05
(c+0.2+0.2)*(((a+a')*(u+0.2)/ (2*0.2*b*a')-
(π*(D^2)/4)*(0.2+(u-0.2)/2) (I)+(II)-(III)
Caja Receptora m3 2)+(2*u*0.45)+(b*0.15)) (2*0.2*(Hz+0.15)*(Vt)/2)
1.79 0.35 0.08 2.05
CONCRETO F'C=175
04.01.08 m3 (I) (II) (III) -
Kg/cm2+30%PG
- - - -
Caja Receptora m3
- - - -
Rc A° - (I)*(II)
Muro Salida m3
- 0.00 - -
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) -
(Mc+0.45-0.15)*Rc*0.3 - - (I)
Muro Salida m3
- - - -
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) -
Long. Tubería Ø 2" Rc/2 - (I)*(II)
Muro Salida m
- - - -
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) -
Rc - - (I)
Muro Salida m
- - - -
CONCRETO
04.01.12 m3 (I) (II) (III) 1.03
F'C=140KG/CM2+60%PM(5"TAM.M
Emboquillado/Emb. Entrada D - (I)*(II+0.15+0.15)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.37 2.78 - 1.03
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 5.64
(0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)+(III)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.69 0.57 0.81 5.92
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)-(II)
Muro Salida m2
- 0.28 - -0.28
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 5.64
SUPERFICIES VISIBLES (0.15*b)+((π)*(D^2)/4)
((b*c)+(2*a*c))+(2*b*(a')) 0.2*(c+0.2+0.2) +0.2*(b+(2*u)) (I)-(II)
Caja Receptora m2 +(0.9*0.3/2)
5.69 0.57 0.81 5.92
((0.65+0.3+Mc+0.3)*Rc) π*(D^2)/4 - (I)+(II)+(III)
Muro Salida m2
ELIMINACIÓN DE MATERIAL - 0.28 - -0.28
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN (I) NO (II) (III) 10.95
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
14.17 3.22 - 10.95
DETALLE DE ALCANTARILLAS CAJA DE ENTRADA - MURO DE SALIDA (C-M)
DETALLE DE EXCAVACIÓN
PERFIL LONGITUDINAL MURO SALIDA
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CABEZAL ENTRADA - CABEZAL SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 00+050.00 ALIV TMC Ø=24" - 01
LONG: 7.335 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y CABEZAL
04.01.01 m2 (I) (II) (III) 21.24
REPLANTEO DE ESTRUCTURAS ENTRADA
Canal de Ingreso m2 Lb1 AE - (I)*(II)
- - - - AE = 2.78
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas - Entrada m2 2(Le*(da1+0.20))
4.13 - - 4.13 Lb1 = -
Long. D - (2II)*I Lc = 0.66
Alcantarilla m2
7.335 0.60 - 8.802 Le = 1.75
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) Lf = 1.05
Cabezal - Aletas - Salida m2 2(Le*(da1+0.20))
4.13 - - 4.13 da1 = 0.36
Lb2 AE - (I)*(II) da2 = 0.26
Canal de Salida m2
1.5 2.78 - 4.17 ta1 = 0.19
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 11.67 ta2 = 0.16
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. AE - (I)*(II) Ha = 0.40
Canal de Ingreso m3
- - - - Hc = 1.55
(Lc+0.7)*(Hc+(2*0.4)+ 2(((da2+0.2)*0.4)+
2*((Le*0.4)+((La+0.25)*0.4))+
((((dc-tc)^2)+((Hc)^2))^0.5)) (Ha*(ta2+da2)/2))- (I)+(II)+(III)
Cabezal - Aletas - Entrada m2 2*(La+Le)*(Ha+(Ha+(1.2/1.5)))
+(AE*0.4) (2π(D^2)/4)
(2*0.4*((da1+0.2)+(da2+0.2))/ ((dc+0.2)*(Lc+0.7)*(0.4))+
2*(ta1+ta2)*(La+Le)*(Ha+
2)+(0.4*Lf*(Lc+AE)/2)- (((Hc*(Lc+0.7))-((π)*(D^2)/4)) (I)+(II)+(III)
Cabezal - Aletas - Entrada m3 (Ha+(1.20/1.5)))/4
(0.7*0.15*(D+(AE-1.20))/2) *(dc+tc)/2)
- - - -
Cabezal - Aletas - Entrada m3
- - - -
- - - -
Cabezal - Aletas - Salida m3
- - - -
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) -
- - - -
Cabezal - Aletas m3
- - - -
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) -
- - - -
Cabezal - Aletas m
- - - -
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) -
- - - -
Cabezal - Aletas m
- - - -
CONCRETO
04.01.12 m3 (I) (II) (III) 1.03
F'C=140KG/CM2+60%PM(5"TAM.MA
Emboquillado/Emb. Entrada AE - (I)*(II)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.37 2.78 - 1.03
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 9.25
(2*((La+Le)/2)*((da2)/2))+
2*La*(Ha+(Hc-0.25))/2 (tc*Lc)+(Lc*Hc) (I)+(II)+(III)
Cabezal - Aletas - Entrada m2 ((((D+0.4)+(AE))/2)*(Lf-0.2-dc))
1.49 2.21 1.16 4.86
(2*((La+Le)/2)*((da1)/2))+
2*La*(Ha+(Hc-0.25))/2 (tc*Lc)+(Lc*Hc) (I)+(II)+(III)
Cabezal - Aletas - Salida m2 ((((D+0.4)+(AE))/2)*(Lf-0.2-dc))
1.51 1.82 1.06 4.39
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 9.25
SUPERFICIES VISIBLES
(2*((La+Le)/2)*((da2)/2))+
2*La*(Ha+(Hc-0.25))/2 (tc*Lc)+(Lc*Hc) (I)+(II)+(III)
Cabezal - Aletas - Entrada m2 ((((D+0.4)+(AE))/2)*(Lf-0.2-dc))
1.49 2.21 1.16 4.86
(2*((La+Le)/2)*((da1)/2))+
2*La*(Ha+(Hc-0.25))/2 (tc*Lc)+(Lc*Hc) (I)+(II)+(III)
Cabezal - Aletas - Salida m2 ((((D+0.4)+(AE))/2)*(Lf-0.2-dc))
ELIMINACIÓN DE MATERIAL 1.51 1.82 1.06 4.39
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 (I) (II) (III) 8.01
30M)
EXCAVACIÓN NO
RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
11.67 3.66 - 8.01
METRADO ALCANTARILLAS METÁLICAS TMC Ø 24" CABEZAL ENTRADA - CABEZAL SALIDA
Hz = 0.75
Vt = 0.30
PROGR: 12+779.00 ALIV TMC Ø=24" - 35
LONG: 9.78 m
UNIDAD
ITEM PARTIDA LARGO (m) ANCHO (m) ALTURA (m) PARCIAL TOTAL
(m)
TRAZO NIVELACIÓN Y CABEZAL
04.01.01 m2 (I) (II) (III) 24.17
REPLANTEO DE ESTRUCTURAS ENTRADA
Canal de Ingreso m2 Lb1 AE - (I)*(II)
- - - - AE = 2.78
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) La = 1.30
Cabezal - Aletas - Entrada m2 2(Le*(da1+0.20))
4.13 - - 4.13 Lb1 = -
Long. D - (2II)*I Lc = 0.66
Alcantarilla m2
9.78 0.60 - 11.736 Le = 1.75
((((Lc+0.70)+AE)/2)*Lf)+
- - (I) Lf = 1.05
Cabezal - Aletas - Salida m2 2(Le*(da1+0.20))
4.13 - - 4.13 da1 = 0.36
Lb2 AE - (I)*(II) da2 = 0.26
Canal de Salida m2
1.5 2.78 - 4.17 ta1 = 0.19
EXCAVACIÓN NO CLASIFICADA
04.01.02 m3 (I) (II) (III) 5.64 ta2 = 0.16
C/EQUIPO PARA ESTRUCTURAS
Corte/Emb. Entr. AE - (I)*(II) Ha = 0.40
Canal de Ingreso m3
- - - - Hc = 1.55
Corte/Entrada ((Lc+0.35+0.35)+ (AE))/2 - (I)*(II) Hd = 0.40
Cabezal - Aletas - Entrada m3
1.08 2.07 - 2.24 He = 0.30
Corte/Tubería D - (I)*(2II) Bc = 0.75
Alcantarilla m3
0.36 0.60 - 0.43 tc = 0.20
Corte/Salida ((Lc+0.35+0.35)+ (AE))/2 - (I)*(II) dc = 0.35
Cabezal - Aletas - Salida m3
0.79 2.07 - 1.63 D = 0.60
Corte/Emb. Salida. AE - (I)*(II)
Canal de Salida m3
0.48 2.78 - 1.35
04.01.03 RELLENO C/MATERIAL PROPIO m3 (I) (II) (III) 0.62 CABEZAL SALIDA
Relleno/Emb. Entr. AE - (I)*(II)
Canal de Ingreso m3
- - - - AE = 2.78
Relleno/Entrada ((Lc+0.35+0.35)+ (AE))/2 - (I)*(II) La = 1.30
Cabezal - Aletas - Entrada m3
0.15 2.07 - 0.31 Lb2 = 1.50
Relleno/Tubería D - (I)*(2II) Lc = 0.66
Alcantarilla m3
- 0.60 - - Le = 1.75
Relleno/Salida ((Lc+0.35+0.35)+ (AE))/2 - (I)*(II) Lf = 1.05
Cabezal - Aletas - Salida m3
0.15 2.07 - 0.31 da1 = 0.36
Relleno/Emb. Salida. AE - (I)*(II) da2 = 0.26
Canal de Salida m3
- - - - ta1 = 0.19
RELLENO COMPACTADO CON
04.01.04 m3 (I) (II) (III) 1.40 ta2 = 0.16
AFIRMADO
Mat. Afir. / Emb. Entrada AE - (I)*(II) Ha = 0.70
Canal de Ingreso m3
- - - - Hc = 1.80
Mat. Afir. / Tubería D - (I)*(2II) Hd = 0.40
Alcantarilla m3
0.91 0.60 - 1.09 He = 0.30
Mat. Afir. / Emb. Salida AE - (I)*(II) Bc = 0.78
Canal de Salida m3
0.11 2.78 - 0.31 tc = 0.20
ENCOFRADO Y DESENCOFRADO
04.01.05 m2 (I) (II) (III) 44.10 dc = 0.38
-ALCANTARILLAS
Lb1 AE HE ((III)*(II))+(2*(I)*(III)) D = 0.60
Canal de Ingreso m2
- -
(Lc+0.7)*(Hc+(2*0.4)+ -
2(((da2+0.2)*0.4)+ -
2*((Le*0.4)+((La+0.25)*0.4))+
((((dc-tc)^2)+((Hc)^2))^0.5)) (Ha*(ta2+da2)/2))- (I)+(II)+(III)
Cabezal - Aletas - Entrada m2 2*(La+Le)*(Ha+(Ha+(1.2/1.5)))
12.40 +(AE*0.4)
6.43
(Lc+0.7)*(Hc+(2*0.4)+ (2π(D^2)/4)
0.10
2(((da2+0.2)*0.4)+ 18.93
2*((Le*0.4)+((La+0.25)*0.4))+
((((dc-tc)^2)+((Hc)^2))^0.5)) (Ha*(ta2+da2)/2))- (I)+(II)+(III)
Cabezal - Aletas - Salida m2 2*(La+Le)*(Ha+(Ha+(1.2/1.5)))
16.06 +(AE*0.4)
7.11 (2π(D^2)/4)
0.27 23.44
Lb2 AE HE ((III)*(II))+(2*(I)*(III))
Canal de Salida m2
1.50 2.78 0.30 1.73
INSTALACIÓN DE ALCANTARILLA
04.01.06 m (I) (II) (III) 9.78
TMC Ø=24"
Long. - - (I)
Alcantarilla TMC Ø = 24"
9.78 - - 9.78
04.01.07 CONCRETO F'C=175 Kg/cm2 m3 (I)
(2*0.4*((da1+0.2)+(da2+0.2))/ (II)
((dc+0.2)*(Lc+0.7)*(0.4))+ (III) 5.80
2*(ta1+ta2)*(La+Le)*(Ha+
2)+(0.4*Lf*(Lc+AE)/2)- (((Hc*(Lc+0.7))-((π)*(D^2)/4)) (I)+(II)+(III)
Cabezal - Aletas - Entrada m3 (Ha+(1.20/1.5)))/4
(0.7*0.15*(D+(AE-1.20))/2)
1.02
(2*0.4*((da1+0.2)+(da2+0.2))/ *(dc+tc)/2)
0.80
((dc+0.2)*(Lc+0.7)*(0.4))+ 0.85 2.67
2*(ta1+ta2)*(La+Le)*(Ha+
2)+(0.4*Lf*(Lc+AE)/2)- (((Hc*(Lc+0.7))-((π)*(D^2)/4)) (I)+(II)+(III)
Cabezal - Aletas - Salida m3 (Ha+(1.20/1.5)))/4
(0.7*0.15*(D+(AE-1.20))/2)
1.02 *(dc+tc)/2)
0.94 1.17 3.13
04.01.08 CONCRETO F'C=175 Kg/cm2+30%PG m3 (I) (II) (III) -
- - - -
Cabezal - Aletas - Entrada m3
- - - -
- - - -
Cabezal - Aletas - Salida m3
- - - -
04.01.09 FILTRO DRENANTE m3 (I) (II) (III) -
- - - -
Cabezal - Aletas m3
- - - -
04.01.10 TUBERÍA PVC DE 2" m (I) (II) (III) -
- - - -
Cabezal - Aletas m
- - - -
04.01.11 TUBERÍA PVC DE 6" m (I) (II) (III) -
- - - -
Cabezal - Aletas m
- - - -
CONCRETO
04.01.12 m3 (I) (II) (III) 1.03
F'C=140KG/CM2+60%PM(5"TAM.MA
Emboquillado/Emb. Entrada AE - (I)*(II)
Canal de Ingreso m3
- - - -
Emboquillado/Emb. Salida AE - (I)*(II)
Canal de Salida m3
0.37 2.78 - 1.03
04.01.13 CURADO DE CONCRETO m2 (I) (II) (III) 10.54
(2*((La+Le)/2)*((da2)/2))+
2*La*(Ha+(Hc-0.25))/2 (tc*Lc)+(Lc*Hc) (I)+(II)+(III)
Cabezal - Aletas - Entrada m2 ((((D+0.4)+(AE))/2)*(Lf-0.2-dc))
1.49 2.21 1.16 4.86
(2*((La+Le)/2)*((da1)/2))+
2*La*(Ha+(Hc-0.25))/2 (tc*Lc)+(Lc*Hc) (I)+(II)+(III)
Cabezal - Aletas - Salida m2 ((((D+0.4)+(AE))/2)*(Lf-0.2-dc))
1.44 2.93 1.32 5.68
ACABADO SOLAQUEADO
04.01.14 m2 (I) (II) (III) 10.54
SUPERFICIES VISIBLES (2*((La+Le)/2)*((da2)/2))+
2*La*(Ha+(Hc-0.25))/2 (tc*Lc)+(Lc*Hc) (I)+(II)+(III)
Cabezal - Aletas - Entrada m2 ((((D+0.4)+(AE))/2)*(Lf-0.2-dc))
1.49 2.21 1.16 4.86
(2*((La+Le)/2)*((da1)/2))+
2*La*(Ha+(Hc-0.25))/2 (tc*Lc)+(Lc*Hc) (I)+(II)+(III)
Cabezal - Aletas - Salida m2 ((((D+0.4)+(AE))/2)*(Lf-0.2-dc))
ELIMINACIÓN DE MATERIAL 1.44 2.93 1.32 5.68
04.01.15 EXCEDENTE MANUAL (DIST. MÁX. m3 EXCAVACIÓN(I) NO (II) (III) 5.02
30M) RELLENO C/MATERIAL
CLASIFICADA C/EQUIPO - (I)-(II)
m3 PROPIO
PARA ESTRUCTURAS
5.64 0.62 - 5.02
DETALLES DE ALCANTARILLA DE Ø 24" CABEZAL DE ENTRADA - CABEZAL DE SALIDA (E-S)
CABEZAL DE ENTRADA
CORTE D-D
ELEVACIÓN FRONTAL
ELEVACIÓN FRONTAL
DETALLE DE EXCAVACIÓN
CABEZAL DE SALIDA