Phase Prepared by
Area UCSM Date Prepared
Work that must and can be done before Planned Activities Complete
Ref Task Description Location
starting this task
On Time? Reasons for delay or disruption* *Instalación tab General
Snag Free? Hour
TABLERO TRIFÁSICO -230V-3Ø -60HZ (TGE) Instalacion de tablero general de emergencia Sotano 1 base para tableros 8:30 *Instalacion tab General emergencia
TABLERO TRIFÁSICO -230V-3Ø -60HZ Liberacion de tablero grupo electrogeno Sotano 2 base para tableros 9:30 Contra incendio
CINTA LED - L06 MQ73 Liberacion de canalizacion en graderia Nivel 1 Trazo topografico 10:30
*reasons 1 Late materials • 2 Wrong materials • 3 Other trade in work area • 4 Prerequisite activity not completed • 5 Unplanned work• 6 Labour shortage • 7 Over estimation of what could be achieved • 8 Task required rework •
9 Late or incomplete information • 10 Weather • 11 Plant/tools unavailable • 12 Other, please state