VALORIZACION N° 02

PROYECTO: MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I.E. N° 80621 LEONCIO PRADO, NIVEL SECUNDARIO DEL CASERIO COLPA SECA, DISTRITO DE ANGASMARCA, SANTIAGO DE CHUCHO LA LIBERTAD
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 861,218.81
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 31-Oct-13 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. PAUL ERIC GUTIERREZ PACHECO

PRESUPUESTADO VALORIZACION N° 02 SALDO PORCENT


AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZA
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL DO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
1.00 ESTRUCTURAS
1.01 OBRAS PROVISIONALES
01.01.01 TRANSPORTE DE EQUIPO Y/O HERRAMIENTAS A OBRA GLB 1.00 4,000.00 4,000.00 0.60 2,400.00 0.40 1,600.00 1.00 4,000.00 0.00 0.00 100.00%
01.01.03 ALMACEN DE OBRA M2 50.00 50.00 2,500.00 25.00 1,250.00 25.00 1,250.00 50.00 2,500.00 0.00 0.00 100.00%
1.02 TRABAJOS PRELIMINARES
01.02.01 CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.40m UND 1.00 1,000.00 1,000.00 1.00 1,000.00 0.00 0.00 1.00 1,000.00 0.00 0.00 100.00%
01.02.02 FLETE TERRESTRE GLB 1.00 77,000.00 77,000.00 0.40 30,800.00 0.50 38,500.00 0.90 69,300.00 0.10 7,700.00 90.00%
01.02.03 DEMOLICION CONSTRUCCION EXISTENTE GLB 1.00 5,000.00 5,000.00 1.00 5,000.00 0.00 0.00 1.00 5,000.00 0.00 0.00 100.00%
01.02.04 TRAZO Y REPLANTEO INICAL M2 415.00 2.99 1,240.85 415.00 1,240.85 0.00 0.00 415.00 1,240.85 0.00 0.00 100.00%
1.03 MOVIMIENTO DE TIERRAS
01.03.01 CORTE MANUALEN TERRENO NORMAL H=0.60m M3 270.00 28.28 7,635.60 270.00 7,635.60 0.00 0.00 270.00 7,635.60 0.00 0.00 100.00%
01.03.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS M3 118.03 24.96 2,946.03 118.03 2,946.03 0.00 0.00 118.03 2,946.03 0.00 0.00 100.00%
01.03.03 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS Y VIG M3 63.30 24.96 1,579.97 63.30 1,579.97 0.00 0.00 63.30 1,579.97 0.00 0.00 100.00%
01.03.04 RELLENO CON MATERIAL PROPIO M3 33.69 37.16 1,251.92 13.48 500.77 20.21 751.15 33.69 1,251.92 0.00 0.00 100.00%
01.03.05 BASE DE AFIRMADO COMPACTADO A MANO H=0.15 m M2 382.95 11.00 4,212.45 0.00 0.00 382.95 4,212.45 382.95 4,212.45 0.00 0.00 100.00%
01.03.06 ACARREO DE MATERIAL EXCEDENTE M3 507.90 19.97 10,142.76 507.90 10,142.76 0.00 0.00 507.90 10,142.76 0.00 0.00 100.00%
01.03.07 ELIMINACION MATERIAL EXCEDENTE D=50 M M3 507.90 20.05 10,183.40 406.32 8,146.72 101.58 2,036.68 507.90 10,183.40 0.00 0.00 100.00%
1.04 CONCRETO SIMPLE
01.04.01 CONCRETO SOLADO MEZCLA 1:12 CEMENTO-HORMIGON e=0M2 3.78 27.58 104.25 3.78 104.25 0.00 0.00 3.78 104.25 0.00 0.00 100.00%
01.04.02 CONCRETO FALSA ZAPATA 1:10 + 25% P.M. M3 30.63 151.86 4,651.47 30.63 4,651.47 0.00 0.00 30.63 4,651.47 0.00 0.00 100.00%
01.04.03 CONCRETO CILOPEO PARA CIMIENTACION 1:10 + 30% P.G. M3 60.11 213.23 12,817.26 60.11 12,817.26 24.04 5,126.90 84.15 17,944.16 -24.04 -5,126.90 140.00%
01.04.04 CONCRETO FALSO PISO e=4" DE CONCRETO 1:10 M2 263.04 70.06 18,428.58 0.00 0.00 263.04 18,428.58 263.04 18,428.58 0.00 0.00 100.00%
1.05 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
01.05.01 SOBRECIMIENTO ARMADO
01.05.01.01 CONCRETO SOBRECIMIENTOS f'c=175 kg/cm2 M3 8.58 264.94 2,273.19 0.86 227.32 7.72 2,045.87 8.58 2,273.19 0.00 0.00 100.00%
01.05.01.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMI M2 94.86 37.28 3,536.38 9.49 353.64 85.37 3,182.74 94.86 3,536.38 0.00 0.00 100.00%
01.05.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 KG 185.55 5.73 1,063.20 18.56 106.32 167.00 956.88 185.55 1,063.20 0.00 0.00 100.00%
01.05.02 ZAPATAS
01.05.02.01 CONCRETO ZAPATAS f'c=210 kg/cm2 m3 49.11 311.62 15,303.66 49.11 15,303.66 0.00 0.00 49.11 15,303.66 0.00 0.00 100.00%
01.05.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,109.12 5.73 6,355.26 1,109.12 6,355.26 0.00 0.00 1,109.12 6,355.26 0.00 0.00 100.00%
01.05.03 VIGAS DE CIMENTACION
01.05.03.01 CONCRETO VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 10.04 275.65 2,767.53 7.03 1,937.27 3.01 830.26 10.04 2,767.53 0.00 0.00 100.00%
01.05.03.02 ENCOFRADO EN VIGA DE CIMENTACION m2 30.16 22.73 685.54 21.11 479.88 9.05 205.66 30.16 685.54 0.00 0.00 100.00%
01.05.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 2,554.16 5.73 14,635.34 2,554.16 14,635.34 0.00 0.00 2,554.16 14,635.34 0.00 0.00 100.00%
01.05.04 COLUMNAS
01.05.04.01 CONCRETO COLUMNAS f'c=210 kg/cm2 m3 43.81 311.22 13,634.55 17.52 5,453.82 26.29 8,180.73 43.81 13,634.55 0.00 0.00 100.00%
01.05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 361.02 53.35 19,260.42 144.41 7,704.17 216.61 11,556.25 361.02 19,260.42 0.00 0.00 100.00%
01.05.04.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 8,368.13 5.73 47,949.38 8,368.13 47,949.38 0.00 0.00 8,368.13 47,949.38 0.00 0.00 100.00%
01.05.05 VIGAS
01.05.05.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 55.51 340.36 18,893.38 0.00 0.00 33.31 11,336.03 33.31 11,336.03 22.20 7,557.35 60.00%
01.05.05.02 ENCOFRADO y DESENCOFRADO EN VIGAS m2 467.11 47.37 22,127.00 0.00 0.00 280.27 13,276.20 280.27 13,276.20 186.84 8,850.80 60.00%
01.05.05.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 9,915.93 5.73 56,818.28 0.00 0.00 5,949.56 34,090.97 5,949.56 34,090.97 3,966.37 22,727.31 60.00%
VALORIZACION N° 02
PROYECTO: MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I.E. N° 80621 LEONCIO PRADO, NIVEL SECUNDARIO DEL CASERIO COLPA SECA, DISTRITO DE ANGASMARCA, SANTIAGO DE CHUCHO LA LIBERTAD
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 861,218.81
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 31-Oct-13 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. PAUL ERIC GUTIERREZ PACHECO

PRESUPUESTADO VALORIZACION N° 02 SALDO PORCENT


AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZA
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL DO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
01.05.06 LOSA ALIGERADA
01.05.06.01 CONCRETO LOSAS f'c= 210 kg/cm2 m3 14.50 317.44 4,602.88 0.00 0.00 14.50 4,602.88 14.50 4,602.88 0.00 0.00 100.00%
01.05.06.02 ENCOFRADO Y DESENCOFRADO NORMAL DE LOSA ALIGE m2 161.14 27.38 4,412.01 0.00 0.00 80.57 4,412.01 80.57 4,412.01 80.57 0.00 100.00%
01.05.06.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 754.60 5.73 4,323.86 0.00 0.00 754.60 4,323.86 754.60 4,323.86 0.00 0.00 100.00%
01.05.06.04 LADRILLO PARA TECHO DE h=0.15 m und 1,450.22 2.39 3,466.03 0.00 0.00 1,450.22 3,466.03 1,450.22 3,466.03 0.00 0.00 100.00%
01.05.07 ESCALERAS
01.05.07.01 CONCRETO ESCALERAS f´c=210 kg/cm2 m3 5.25 303.52 1,593.48 0.00 0.00 0.00 0.00 0.00 0.00 5.25 1,593.48 0.00%
01.05.07.02 ENCOFRADO NORMAL EN ESCALERA m2 32.42 68.47 2,219.80 0.00 0.00 0.00 0.00 0.00 0.00 32.42 2,219.80 0.00%
01.05.07.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 472.45 5.73 2,707.14 0.00 0.00 0.00 0.00 0.00 0.00 472.45 2,707.14 0.00%
1.06 ESTRUCTURAS DE MADERA
1.06.01 TIJERAL DE MADERA und 1.00 1,000.00 1,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,000.00 0.00%
1.06.02 CORREAS DE MADERA DE 2.5"X3" m 426.50 10.00 4,265.00 0.00 0.00 0.00 0.00 0.00 0.00 426.50 4,265.00 0.00%
1.07 COBERTURAS
1.07.01 PLANCHA FIBRAFORTE und 151.85 54.00 8,199.90 0.00 0.00 0.00 0.00 0.00 0.00 151.85 8,199.90 0.00%
1.07.02 CUMBRERA DE FIBRAFORTE m 48.55 15.00 728.25 0.00 0.00 0.00 0.00 0.00 0.00 48.55 728.25 0.00%
1.07.03 MONTAJE DE COBERTURA glb 1.00 6,000.00 6,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 6,000.00 0.00%
1.08 VARIOS
1.08.01 CANALETA DE PVC m 97.10 52.43 5,090.95 0.00 0.00 0.00 0.00 0.00 0.00 97.10 5,090.95 0.00%
1.08.02 JUNTAS SISMICAS m 108.80 10.08 1,096.70 0.00 0.00 108.80 1,096.70 108.80 1,096.70 0.00 0.00 100.00%
2.00 ARQUITECTURA
2.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO LADRILLO K.K DE ARCILLA 18H ( 09x013x0.24) AMARR m2 73.54 97.38 7,161.33 0.00 0.00 73.54 7,161.33 73.54 7,161.33 0.00 0.00 100.00%
02.01.02 MURO LADRILLO K.K DE ARCILLA UNA CARAVISTA 18H AMA m2 121.89 97.38 11,869.65 0.00 0.00 121.89 11,869.65 121.89 11,869.65 0.00 0.00 100.00%
02.01.03 MURO LADRILLO K.K DE ARCILLA UNA CARAVISTA 18H AMA m2 38.50 74.19 2,856.32 0.00 0.00 38.50 2,856.32 38.50 2,856.32 0.00 0.00 100.00%
02.01.04 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) A m2 107.45 60.10 6,457.75 0.00 0.00 107.45 6,457.75 107.45 6,457.75 0.00 0.00 100.00%
2.02 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.01 TARRAJEO MUROS EXTERIORES m2 123.29 17.44 2,150.18 0.00 0.00 0.00 0.00 0.00 0.00 123.29 2,150.18 0.00%
02.02.02 TARRAJEO MUROS INTERIORES m2 485.94 17.10 8,309.57 0.00 0.00 0.00 0.00 0.00 0.00 485.94 8,309.57 0.00%
02.02.03 TARRAJEO COLUMNAS m2 250.64 32.18 8,065.60 0.00 0.00 0.00 0.00 0.00 0.00 250.64 8,065.60 0.00%
02.02.04 TARRAJEO DE VIGAS m2 448.44 42.75 19,170.81 0.00 0.00 0.00 0.00 0.00 0.00 448.44 19,170.81 0.00%
02.02.05 DERRAMES A=0.15 m.MORTERO 1:5 m 333.32 11.58 3,859.85 0.00 0.00 0.00 0.00 0.00 0.00 333.32 3,859.85 0.00%
02.02.06 REVESTIMIENTO DE ESCALERAS m2 50.31 27.88 1,402.64 0.00 0.00 0.00 0.00 0.00 0.00 50.31 1,402.64 0.00%
2.03 CIELORRASOS
02.03.01 CIELORRASO CON MEZCLA 1:5 (C:A) m2 167.27 36.98 6,185.64 0.00 0.00 0.00 0.00 0.00 0.00 167.27 6,185.64 0.00%
02.03.02 CIELORRASO DE MADERA SUPER BOARD m2 423.22 65.08 27,543.16 0.00 0.00 0.00 0.00 0.00 0.00 423.22 27,543.16 0.00%
2.04 PISOS Y PAVIMENTOS
02.04.01 CONTRAPISO DE 2" m2 445.58 22.24 9,909.70 0.00 0.00 0.00 0.00 0.00 0.00 445.58 9,909.70 0.00%
02.04.02 CONCRETO VEREDAS f'c=140 kg/cm2 INC ENCOFRADO m2 119.91 63.49 7,613.09 0.00 0.00 0.00 0.00 0.00 0.00 119.91 7,613.09 0.00%
2.05 CONTRAZOCALOS
02.05.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.10-0.20 m m 422.10 9.00 3,798.90 0.00 0.00 0.00 0.00 0.00 0.00 422.10 3,798.90 0.00%
2.06 CARPINTERIA DE MADERA
02.06.01 PUERTAS DE MADERA CEDRO NACIONAL
VALORIZACION N° 02
PROYECTO: MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I.E. N° 80621 LEONCIO PRADO, NIVEL SECUNDARIO DEL CASERIO COLPA SECA, DISTRITO DE ANGASMARCA, SANTIAGO DE CHUCHO LA LIBERTAD
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 861,218.81
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 31-Oct-13 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. PAUL ERIC GUTIERREZ PACHECO

PRESUPUESTADO VALORIZACION N° 02 SALDO PORCENT


AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZA
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL DO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
02.06.001.01 PUERTA DE MADERA P1 und 6.00 878.67 5,272.02 0.00 0.00 0.00 0.00 0.00 0.00 6.00 5,272.02 0.00%
02.06.001.02 PUERTA DE MADERA P2 und 1.00 1,278.67 1,278.67 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,278.67 0.00%
VALORIZACION N° 02
PROYECTO: MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I.E. N° 80621 LEONCIO PRADO, NIVEL SECUNDARIO DEL CASERIO COLPA SECA, DISTRITO DE ANGASMARCA, SANTIAGO DE CHUCHO LA LIBERTAD
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 861,218.81
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 31-Oct-13 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. PAUL ERIC GUTIERREZ PACHECO

PRESUPUESTADO VALORIZACION N° 02 SALDO PORCENT


AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZA
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL DO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
02.06.001.03 PUERTA DE MADERA P3 und 1.00 878.67 878.67 0.00 0.00 0.00 0.00 0.00 0.00 1.00 878.67 0.00%
02.06.001.04 PUERTA DE MADERA P4 und 1.00 876.76 876.76 0.00 0.00 0.00 0.00 0.00 0.00 1.00 876.76 0.00%
02.06.02 VENTANAS DE MADERA
02.06.02.01 VENTANA DE MADERA -V1 und 4.00 339.35 1,357.40 0.00 0.00 0.00 0.00 0.00 0.00 4.00 1,357.40 0.00%
02.06.02.02 VENTANA DE MADERA -V2 und 8.00 338.20 2,705.60 0.00 0.00 0.00 0.00 0.00 0.00 8.00 2,705.60 0.00%
02.06.02.03 VENTANA DE MADERA -V3 und 2.00 339.35 678.70 0.00 0.00 0.00 0.00 0.00 0.00 2.00 678.70 0.00%
02.06.02.04 VENTANA DE MADERA -V4 und 2.00 369.35 738.70 0.00 0.00 0.00 0.00 0.00 0.00 2.00 738.70 0.00%
02.06.02.05 VENTANA DE MADERA -VA1 und 4.00 359.35 1,437.40 0.00 0.00 0.00 0.00 0.00 0.00 4.00 1,437.40 0.00%
02.06.02.06 VENTANA DE MADERA -VA2 und 8.00 309.35 2,474.80 0.00 0.00 0.00 0.00 0.00 0.00 8.00 2,474.80 0.00%
02.06.02.07 VENTANA DE MADERA -VA3 und 2.00 309.35 618.70 0.00 0.00 0.00 0.00 0.00 0.00 2.00 618.70 0.00%
02.06.02.08 VENTANA DE MADERA -VA4 und 2.00 309.35 618.70 0.00 0.00 0.00 0.00 0.00 0.00 2.00 618.70 0.00%
2.07 VIDRIOS
02..07.01 VIDRIO SEMIDOBLE INCOLORO CRUDO p2 1,234.58 4.73 5,839.56 0.00 0.00 0.00 0.00 0.00 0.00 1,234.58 5,839.56 0.00%
2.08 PINTURA
02.08.01 PINTURA ESMALTE EN CONTRAZOCALOS m 422.10 4.63 1,954.32 0.00 0.00 0.00 0.00 0.00 0.00 422.10 1,954.32 0.00%
02.08.02 PINTURA LATEX DOS MANOS EN INTERIORES Y EXTERIOR m2 632.30 11.22 7,094.41 0.00 0.00 0.00 0.00 0.00 0.00 632.30 7,094.41 0.00%
02.08.03 PINTURA LATEX DOS MANOS EN CIELO RASO m2 590.49 8.71 5,143.17 0.00 0.00 0.00 0.00 0.00 0.00 590.49 5,143.17 0.00%
02.08.04 PINTURA LATEX DOS MANOS EN VESTIDURAS DE DERRAM m 333.32 6.89 2,296.57 0.00 0.00 0.00 0.00 0.00 0.00 333.32 2,296.57 0.00%
02.08.05 PINTURA LATEX DOS MANOS EN VIGAS Y COLUMNAS m2 699.08 10.02 7,004.78 0.00 0.00 0.00 0.00 0.00 0.00 699.08 7,004.78 0.00%
2.09 VARIOS
02.09.01 PIZARRA ACRILICA und 6.00 270.00 1,620.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 1,620.00 0.00%
02.09.02 COCINA MEJORADA PARA LEÑA und 1.00 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,500.00 0.00%
02.09.03 MUEBLE DE CONCRETO und 1.00 4,000.00 4,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 4,000.00 0.00%
3.00 INSTALACIONES ELECTRICAS
3.01 SALIDA PARA CENTRO DE LUZ pto 45.00 134.49 6,052.05 0.00 0.00 22.50 3,026.03 22.50 3,026.03 22.50 3,026.03 50.00%
3.02 SALIDA PARA BRAQUETE pto 1.00 125.09 125.09 0.00 0.00 1.00 125.09 1.00 125.09 0.00 0.00 100.00%
3.03 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE pto 16.00 93.67 1,498.72 0.00 0.00 8.00 749.36 8.00 749.36 8.00 749.36 50.00%
3.04 SALIDA PARA INTERRUPTOR DE CONMUTACION pto 2.00 120.47 240.94 0.00 0.00 1.00 120.47 1.00 120.47 1.00 120.47 50.00%
3.05 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PUES pto 28.00 73.25 2,051.00 0.00 0.00 14.00 1,025.50 14.00 1,025.50 14.00 1,025.50 50.00%
3.06 TABLEROS GENERAL und 1.00 96.29 96.29 0.00 0.00 0.00 0.00 0.00 0.00 1.00 96.29 0.00%
3.07 SUB TABLEROS DE DISTRIBUCION und 3.00 306.29 918.87 0.00 0.00 0.00 0.00 0.00 0.00 3.00 918.87 0.00%
3.08 PUESTA A TIERRA und 1.00 1,219.36 1,219.36 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,219.36 0.00%
COSTO TOTAL DIRECTO 634,649.09 190,721.73 208,860.33 399,582.07 235,067.03 62.96%
GASTOS GENERALES 10% 63,464.91 19,072.17 20,886.03 39,958.21 23,506.70
UTILIDAD 5% 31,732.45 9,536.09 10,443.02 19,979.10 11,753.35
SUB TOTAL 729,846.45 219,329.99 240,189.38 459,519.37 270,327.08
IGV 18% 131,372.36 39,479.40 43,234.09 82,713.49 48,658.87
TOTAL S/, 861,218.81 258,809.39 283,423.47 542,232.86 318,985.95
Avance por mes 258,809.39 283,423.47
Avance acumulado 258,809.39 542,232.86
% DE AVANCE EJECUTADO POR MES 32.91% 37.04%
% DE AVANCE PROGRAMADO POR MES 45.06%
VALORIZACION N° 02
PROYECTO: MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I.E. N° 80621 LEONCIO PRADO, NIVEL SECUNDARIO DEL CASERIO COLPA SECA, DISTRITO DE ANGASMARCA, SANTIAGO DE CHUCHO LA LIBERTAD
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 861,218.81
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 31-Oct-13 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. PAUL ERIC GUTIERREZ PACHECO

PRESUPUESTADO VALORIZACION N° 02 SALDO PORCENT


AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZA
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL DO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
% DE AVANCE EJECUTADO ACUMULADO 62.96%
% DE AVANCE PROGRAMADO ACUMULADO 60.16%
VALORIZACION N° 02
PROYECTO: MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I.E. N° 80621 LEONCIO PRADO, NIVEL SECUNDARIO DEL CASERIO COLPA SECA, DISTRITO DE ANGASMARCA, SANTIAGO DE CHUCHO LA LIBERTAD
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 861,218.81
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 31-Oct-13 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. PAUL ERIC GUTIERREZ PACHECO

PRESUPUESTADO VALORIZACION N° 02 SALDO PORCENT


AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZA
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL DO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
1.00 ESTRUCTURAS
1.01 OBRAS PROVISIONALES
01.01.01 TRANSPORTE DE EQUIPO Y/O HERRAMIENTAS A OBRA GLB 1.00 4,000.00 4,000.00 0.60 2,400.00 0.40 1,600.00 1.00 4,000.00 0.00 0.00 100.00%
01.01.03 ALMACEN DE OBRA M2 50.00 50.00 2,500.00 25.00 1,250.00 25.00 1,250.00 50.00 2,500.00 0.00 0.00 100.00%
1.02 TRABAJOS PRELIMINARES
01.02.01 CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.40m UND 1.00 1,000.00 1,000.00 1.00 1,000.00 0.00 0.00 1.00 1,000.00 0.00 0.00 100.00%
01.02.02 FLETE TERRESTRE GLB 1.00 77,000.00 77,000.00 0.40 30,800.00 0.50 38,500.00 0.90 69,300.00 0.10 7,700.00 90.00%
01.02.03 DEMOLICION CONSTRUCCION EXISTENTE GLB 1.00 5,000.00 5,000.00 1.00 5,000.00 0.00 0.00 1.00 5,000.00 0.00 0.00 100.00%
01.02.04 TRAZO Y REPLANTEO INICAL M2 415.00 2.99 1,240.85 415.00 1,240.85 0.00 0.00 415.00 1,240.85 0.00 0.00 100.00%
1.03 MOVIMIENTO DE TIERRAS
01.03.01 CORTE MANUALEN TERRENO NORMAL H=0.60m M3 270.00 28.28 7,635.60 270.00 7,635.60 0.00 0.00 270.00 7,635.60 0.00 0.00 100.00%
01.03.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS M3 118.03 24.96 2,946.03 118.03 2,946.03 0.00 0.00 118.03 2,946.03 0.00 0.00 100.00%
01.03.03 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS Y VIG M3 63.30 24.96 1,579.97 63.30 1,579.97 0.00 0.00 63.30 1,579.97 0.00 0.00 100.00%
01.03.04 RELLENO CON MATERIAL PROPIO M3 33.69 37.16 1,251.92 13.48 500.77 20.21 751.15 33.69 1,251.92 0.00 0.00 100.00%
01.03.05 BASE DE AFIRMADO COMPACTADO A MANO H=0.15 m M2 382.95 11.00 4,212.45 0.00 0.00 382.95 4,212.45 382.95 4,212.45 0.00 0.00 100.00%
01.03.06 ACARREO DE MATERIAL EXCEDENTE M3 507.90 19.97 10,142.76 507.90 10,142.76 0.00 0.00 507.90 10,142.76 0.00 0.00 100.00%
01.03.07 ELIMINACION MATERIAL EXCEDENTE D=50 M M3 507.90 20.05 10,183.40 406.32 8,146.72 101.58 2,036.68 507.90 10,183.40 0.00 0.00 100.00%
1.04 CONCRETO SIMPLE
01.04.01 CONCRETO SOLADO MEZCLA 1:12 CEMENTO-HORMIGON e=0M2 3.78 27.58 104.25 3.78 104.25 0.00 0.00 3.78 104.25 0.00 0.00 100.00%
01.04.02 CONCRETO FALSA ZAPATA 1:10 + 25% P.M. M3 30.63 151.86 4,651.47 30.63 4,651.47 0.00 0.00 30.63 4,651.47 0.00 0.00 100.00%
01.04.03 CONCRETO CILOPEO PARA CIMIENTACION 1:10 + 30% P.G. M3 60.11 213.23 12,817.26 36.07 7,690.36 24.04 5,126.90 60.11 12,817.26 0.00 0.00 100.00%
01.04.04 CONCRETO FALSO PISO e=4" DE CONCRETO 1:10 M2 263.04 70.06 18,428.58 0.00 0.00 263.04 18,428.58 263.04 18,428.58 0.00 0.00 100.00%
1.05 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
01.05.01 SOBRECIMIENTO ARMADO
01.05.01.01 CONCRETO SOBRECIMIENTOS f'c=175 kg/cm2 M3 8.58 264.94 2,273.19 0.86 227.32 7.72 2,045.87 8.58 2,273.19 0.00 0.00 100.00%
01.05.01.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMI M2 94.86 37.28 3,536.38 9.49 353.64 85.37 3,182.74 94.86 3,536.38 0.00 0.00 100.00%
01.05.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 KG 185.55 5.73 1,063.20 18.56 106.32 167.00 956.88 185.55 1,063.20 0.00 0.00 100.00%
01.05.02 ZAPATAS
01.05.02.01 CONCRETO ZAPATAS f'c=210 kg/cm2 m3 49.11 311.62 15,303.66 49.11 15,303.66 0.00 0.00 49.11 15,303.66 0.00 0.00 100.00%
01.05.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,109.12 5.73 6,355.26 1,109.12 6,355.26 0.00 0.00 1,109.12 6,355.26 0.00 0.00 100.00%
01.05.03 VIGAS DE CIMENTACION
01.05.03.01 CONCRETO VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 10.04 275.65 2,767.53 7.03 1,937.27 3.01 830.26 10.04 2,767.53 0.00 0.00 100.00%
01.05.03.02 ENCOFRADO EN VIGA DE CIMENTACION m2 30.16 22.73 685.54 21.11 479.88 9.05 205.66 30.16 685.54 0.00 0.00 100.00%
01.05.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 2,554.16 5.73 14,635.34 2,554.16 14,635.34 0.00 0.00 2,554.16 14,635.34 0.00 0.00 100.00%
01.05.04 COLUMNAS
01.05.04.01 CONCRETO COLUMNAS f'c=210 kg/cm2 m3 43.81 311.22 13,634.55 17.52 5,453.82 26.29 8,180.73 43.81 13,634.55 0.00 0.00 100.00%
01.05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 361.02 53.35 19,260.42 144.41 7,704.17 216.61 11,556.25 361.02 19,260.42 0.00 0.00 100.00%
01.05.04.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 8,368.13 5.73 47,949.38 8,368.13 47,949.38 0.00 0.00 8,368.13 47,949.38 0.00 0.00 100.00%
01.05.05 VIGAS
01.05.05.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 55.51 340.36 18,893.38 0.00 0.00 33.31 11,336.03 33.31 11,336.03 22.20 7,557.35 60.00%
01.05.05.02 ENCOFRADO y DESENCOFRADO EN VIGAS m2 467.11 47.37 22,127.00 0.00 0.00 280.27 13,276.20 280.27 13,276.20 186.84 8,850.80 60.00%
01.05.05.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 9,915.93 5.73 56,818.28 0.00 0.00 5,949.56 34,090.97 5,949.56 34,090.97 3,966.37 22,727.31 60.00%
VALORIZACION N° 02
PROYECTO: MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I.E. N° 80621 LEONCIO PRADO, NIVEL SECUNDARIO DEL CASERIO COLPA SECA, DISTRITO DE ANGASMARCA, SANTIAGO DE CHUCHO LA LIBERTAD
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 861,218.81
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 31-Oct-13 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. PAUL ERIC GUTIERREZ PACHECO

PRESUPUESTADO VALORIZACION N° 02 SALDO PORCENT


AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZA
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL DO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
01.05.06 LOSA ALIGERADA
01.05.06.01 CONCRETO LOSAS f'c= 210 kg/cm2 m3 14.50 317.44 4,602.88 0.00 0.00 14.50 4,602.88 14.50 4,602.88 0.00 0.00 100.00%
01.05.06.02 ENCOFRADO Y DESENCOFRADO NORMAL DE LOSA ALIGE m2 161.14 27.38 4,412.01 0.00 0.00 80.57 4,412.01 80.57 4,412.01 80.57 0.00 100.00%
01.05.06.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 754.60 5.73 4,323.86 0.00 0.00 754.60 4,323.86 754.60 4,323.86 0.00 0.00 100.00%
01.05.06.04 LADRILLO PARA TECHO DE h=0.15 m und 1,450.22 2.39 3,466.03 0.00 0.00 1,450.22 3,466.03 1,450.22 3,466.03 0.00 0.00 100.00%
01.05.07 ESCALERAS
01.05.07.01 CONCRETO ESCALERAS f´c=210 kg/cm2 m3 5.25 303.52 1,593.48 0.00 0.00 0.00 0.00 0.00 0.00 5.25 1,593.48 0.00%
01.05.07.02 ENCOFRADO NORMAL EN ESCALERA m2 32.42 68.47 2,219.80 0.00 0.00 0.00 0.00 0.00 0.00 32.42 2,219.80 0.00%
01.05.07.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 472.45 5.73 2,707.14 0.00 0.00 0.00 0.00 0.00 0.00 472.45 2,707.14 0.00%
1.06 ESTRUCTURAS DE MADERA
1.06.01 TIJERAL DE MADERA und 1.00 1,000.00 1,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,000.00 0.00%
1.06.02 CORREAS DE MADERA DE 2.5"X3" m 426.50 10.00 4,265.00 0.00 0.00 0.00 0.00 0.00 0.00 426.50 4,265.00 0.00%
1.07 COBERTURAS
1.07.01 PLANCHA FIBRAFORTE und 151.85 54.00 8,199.90 0.00 0.00 0.00 0.00 0.00 0.00 151.85 8,199.90 0.00%
1.07.02 CUMBRERA DE FIBRAFORTE m 48.55 15.00 728.25 0.00 0.00 0.00 0.00 0.00 0.00 48.55 728.25 0.00%
1.07.03 MONTAJE DE COBERTURA glb 1.00 6,000.00 6,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 6,000.00 0.00%
1.08 VARIOS
1.08.01 CANALETA DE PVC m 97.10 52.43 5,090.95 0.00 0.00 0.00 0.00 0.00 0.00 97.10 5,090.95 0.00%
1.08.02 JUNTAS SISMICAS m 108.80 10.08 1,096.70 0.00 0.00 108.80 1,096.70 108.80 1,096.70 0.00 0.00 100.00%
COSTO TOTAL DIRECTO 439,703.65 185,594.83 175,468.84 361,063.67 78,639.98 82.12%
GASTOS GENERALES 10% 43,970.37 18,559.48 17,546.88 36,106.37 7,864.00
UTILIDAD 5% 21,985.18 9,279.74 8,773.44 18,053.18 3,932.00
SUB TOTAL 505,659.20 213,434.05 201,789.16 415,223.22 90,435.98
IGV 18% 91,018.66 38,418.13 36,322.05 74,740.18 16,278.48
TOTAL S/, 861,218.81 251,852.18 238,111.21 489,963.39 106,714.46
Avance por mes 238,111.21
Avance acumulado 489,963.39
% DE AVANCE EJECUTADO POR MES 27.65% 12.39%
% DE AVANCE PROGRAMADO POR MES 45.06%
% DE AVANCE EJECUTADO ACUMULADO 56.89%
% DE AVANCE PROGRAMADO ACUMULADO 60.16%
VALORIZACION N° 02
PROYECTO: MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I.E. N° 80621 LEONCIO PRADO, NIVEL SECUNDARIO DEL CASERIO COLPA SECA, DISTRITO DE ANGASMARCA, SANTIAGO DE CHUCHO LA LIBERTAD
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 861,218.81
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 31-Oct-13 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. PAUL ERIC GUTIERREZ PACHECO

PRESUPUESTADO VALORIZACION N° 02 SALDO PORCENT


AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZA
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL DO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
2.00 ARQUITECTURA
2.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO LADRILLO K.K DE ARCILLA 18H ( 09x013x0.24) AMARR m2 73.54 97.38 7,161.33 0.00 0.00 73.54 7,161.33 73.54 7,161.33 0.00 0.00 100.00%
02.01.02 MURO LADRILLO K.K DE ARCILLA UNA CARAVISTA 18H AMA m2 121.89 97.38 11,869.65 0.00 0.00 121.89 11,869.65 121.89 11,869.65 0.00 0.00 100.00%
02.01.03 MURO LADRILLO K.K DE ARCILLA UNA CARAVISTA 18H AMA m2 38.50 74.19 2,856.32 0.00 0.00 38.50 2,856.32 38.50 2,856.32 0.00 0.00 100.00%
02.01.04 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) A m2 107.45 60.10 6,457.75 0.00 0.00 107.45 6,457.75 107.45 6,457.75 0.00 0.00 100.00%
2.02 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.01 TARRAJEO MUROS EXTERIORES m2 123.29 17.44 2,150.18 0.00 0.00 0.00 0.00 0.00 0.00 123.29 2,150.18 0.00%
02.02.02 TARRAJEO MUROS INTERIORES m2 485.94 17.10 8,309.57 0.00 0.00 0.00 0.00 0.00 0.00 485.94 8,309.57 0.00%
02.02.03 TARRAJEO COLUMNAS m2 250.64 32.18 8,065.60 0.00 0.00 0.00 0.00 0.00 0.00 250.64 8,065.60 0.00%
02.02.04 TARRAJEO DE VIGAS m2 448.44 42.75 19,170.81 0.00 0.00 0.00 0.00 0.00 0.00 448.44 19,170.81 0.00%
02.02.05 DERRAMES A=0.15 m.MORTERO 1:5 m 333.32 11.58 3,859.85 0.00 0.00 0.00 0.00 0.00 0.00 333.32 3,859.85 0.00%
02.02.06 REVESTIMIENTO DE ESCALERAS m2 50.31 27.88 1,402.64 0.00 0.00 0.00 0.00 0.00 0.00 50.31 1,402.64 0.00%
2.03 CIELORRASOS
02.03.01 CIELORRASO CON MEZCLA 1:5 (C:A) m2 167.27 36.98 6,185.64 0.00 0.00 0.00 0.00 0.00 0.00 167.27 6,185.64 0.00%
02.03.02 CIELORRASO DE MADERA SUPER BOARD m2 423.22 65.08 27,543.16 0.00 0.00 0.00 0.00 0.00 0.00 423.22 27,543.16 0.00%
2.04 PISOS Y PAVIMENTOS
02.04.01 CONTRAPISO DE 2" m2 445.58 22.24 9,909.70 0.00 0.00 0.00 0.00 0.00 0.00 445.58 9,909.70 0.00%
02.04.02 CONCRETO VEREDAS f'c=140 kg/cm2 INC ENCOFRADO m2 119.91 63.49 7,613.09 0.00 0.00 0.00 0.00 0.00 0.00 119.91 7,613.09 0.00%
2.05 CONTRAZOCALOS
02.05.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.10-0.20 m m 422.10 9.00 3,798.90 0.00 0.00 0.00 0.00 0.00 0.00 422.10 3,798.90 0.00%
2.06 CARPINTERIA DE MADERA
02.06.01 PUERTAS DE MADERA CEDRO NACIONAL
02.06.001.01 PUERTA DE MADERA P1 und 6.00 878.67 5,272.02 0.00 0.00 0.00 0.00 0.00 0.00 6.00 5,272.02 0.00%
02.06.001.02 PUERTA DE MADERA P2 und 1.00 1,278.67 1,278.67 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,278.67 0.00%
VALORIZACION N° 02
PROYECTO: MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I.E. N° 80621 LEONCIO PRADO, NIVEL SECUNDARIO DEL CASERIO COLPA SECA, DISTRITO DE ANGASMARCA, SANTIAGO DE CHUCHO LA LIBERTAD
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 861,218.81
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 31-Oct-13 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. PAUL ERIC GUTIERREZ PACHECO

PRESUPUESTADO VALORIZACION N° 02 SALDO PORCENT


AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZA
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL DO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
02.06.001.03 PUERTA DE MADERA P3 und 1.00 878.67 878.67 0.00 0.00 0.00 0.00 0.00 0.00 1.00 878.67 0.00%
02.06.001.04 PUERTA DE MADERA P4 und 1.00 876.76 876.76 0.00 0.00 0.00 0.00 0.00 0.00 1.00 876.76 0.00%
02.06.02 VENTANAS DE MADERA
02.06.02.01 VENTANA DE MADERA -V1 und 4.00 339.35 1,357.40 0.00 0.00 0.00 0.00 0.00 0.00 4.00 1,357.40 0.00%
02.06.02.02 VENTANA DE MADERA -V2 und 8.00 338.20 2,705.60 0.00 0.00 0.00 0.00 0.00 0.00 8.00 2,705.60 0.00%
02.06.02.03 VENTANA DE MADERA -V3 und 2.00 339.35 678.70 0.00 0.00 0.00 0.00 0.00 0.00 2.00 678.70 0.00%
02.06.02.04 VENTANA DE MADERA -V4 und 2.00 369.35 738.70 0.00 0.00 0.00 0.00 0.00 0.00 2.00 738.70 0.00%
02.06.02.05 VENTANA DE MADERA -VA1 und 4.00 359.35 1,437.40 0.00 0.00 0.00 0.00 0.00 0.00 4.00 1,437.40 0.00%
02.06.02.06 VENTANA DE MADERA -VA2 und 8.00 309.35 2,474.80 0.00 0.00 0.00 0.00 0.00 0.00 8.00 2,474.80 0.00%
02.06.02.07 VENTANA DE MADERA -VA3 und 2.00 309.35 618.70 0.00 0.00 0.00 0.00 0.00 0.00 2.00 618.70 0.00%
02.06.02.08 VENTANA DE MADERA -VA4 und 2.00 309.35 618.70 0.00 0.00 0.00 0.00 0.00 0.00 2.00 618.70 0.00%
2.07 VIDRIOS
02..07.01 VIDRIO SEMIDOBLE INCOLORO CRUDO p2 1,234.58 4.73 5,839.56 0.00 0.00 0.00 0.00 0.00 0.00 1,234.58 5,839.56 0.00%
2.08 PINTURA
02.08.01 PINTURA ESMALTE EN CONTRAZOCALOS m 422.10 4.63 1,954.32 0.00 0.00 0.00 0.00 0.00 0.00 422.10 1,954.32 0.00%
02.08.02 PINTURA LATEX DOS MANOS EN INTERIORES Y EXTERIOR m2 632.30 11.22 7,094.41 0.00 0.00 0.00 0.00 0.00 0.00 632.30 7,094.41 0.00%
02.08.03 PINTURA LATEX DOS MANOS EN CIELO RASO m2 590.49 8.71 5,143.17 0.00 0.00 0.00 0.00 0.00 0.00 590.49 5,143.17 0.00%
02.08.04 PINTURA LATEX DOS MANOS EN VESTIDURAS DE DERRAM m 333.32 6.89 2,296.57 0.00 0.00 0.00 0.00 0.00 0.00 333.32 2,296.57 0.00%
02.08.05 PINTURA LATEX DOS MANOS EN VIGAS Y COLUMNAS m2 699.08 10.02 7,004.78 0.00 0.00 0.00 0.00 0.00 0.00 699.08 7,004.78 0.00%
2.09 VARIOS
02.09.01 PIZARRA ACRILICA und 6.00 270.00 1,620.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 1,620.00 0.00%
02.09.02 COCINA MEJORADA PARA LEÑA und 1.00 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,500.00 0.00%
02.09.03 MUEBLE DE CONCRETO und 1.00 4,000.00 4,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 4,000.00 0.00%
COSTO TOTAL DIRECTO 182,743.12 0.00 28,345.05 28,345.05 154,398.07 15.51%
GASTOS GENERALES 10% 18,274.31 0.00 2,834.51 2,834.51 15,439.81
UTILIDAD 5% 9,137.16 0.00 1,417.25 1,417.25 7,719.90
SUB TOTAL 210,154.59 0.00 32,596.81 32,596.81 177,557.78
IGV 18% 37,827.83 0.00 5,867.43 5,867.43 31,960.40
TOTAL S/, 861,218.81 0.00 38,464.23 38,464.23 209,518.18
Avance por mes 38,464.23
Avance acumulado 38,464.23
% DE AVANCE EJECUTADO POR MES 4.47% 24.33%
% DE AVANCE PROGRAMADO POR MES 45.06%
% DE AVANCE EJECUTADO ACUMULADO 4.47%
% DE AVANCE PROGRAMADO ACUMULADO 60.16%
VALORIZACION N° 02
PROYECTO: MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I.E. N° 80621 LEONCIO PRADO, NIVEL SECUNDARIO DEL CASERIO COLPA SECA, DISTRITO DE ANGASMARCA, SANTIAGO DE CHUCHO LA LIBERTAD
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 861,218.81
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 31-Oct-13 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. PAUL ERIC GUTIERREZ PACHECO

PRESUPUESTADO VALORIZACION N° 02 SALDO PORCENT


AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZA
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL DO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
3.00 INSTALACIONES ELECTRICAS
3.01 SALIDA PARA CENTRO DE LUZ pto 45.00 134.49 6,052.05 0.00 0.00 22.50 3,026.03 22.50 3,026.03 22.50 3,026.03 50.00%
3.02 SALIDA PARA BRAQUETE pto 1.00 125.09 125.09 0.00 0.00 1.00 125.09 1.00 125.09 0.00 0.00 100.00%
3.03 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE pto 16.00 93.67 1,498.72 0.00 0.00 8.00 749.36 8.00 749.36 8.00 749.36 50.00%
3.04 SALIDA PARA INTERRUPTOR DE CONMUTACION pto 2.00 120.47 240.94 0.00 0.00 1.00 120.47 1.00 120.47 1.00 120.47 50.00%
3.05 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PUES pto 28.00 73.25 2,051.00 0.00 0.00 14.00 1,025.50 14.00 1,025.50 14.00 1,025.50 50.00%
3.06 TABLEROS GENERAL und 1.00 96.29 96.29 0.00 0.00 0.00 0.00 0.00 0.00 1.00 96.29 0.00%
3.07 SUB TABLEROS DE DISTRIBUCION und 3.00 306.29 918.87 0.00 0.00 0.00 0.00 0.00 0.00 3.00 918.87 0.00%
3.08 PUESTA A TIERRA und 1.00 1,219.36 1,219.36 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,219.36 0.00%
COSTO TOTAL DIRECTO 12,202.32 0.00 5,046.45 5,046.45 7,155.88 41.36%
GASTOS GENERALES 10% 1,220.23 0.00 504.64 504.64 715.59
UTILIDAD 5% 610.12 0.00 252.32 252.32 357.79
SUB TOTAL 14,032.67 0.00 5,803.41 5,803.41 8,229.26
IGV 18% 2,525.88 0.00 1,044.61 1,044.61 1,481.27
TOTAL S/, 861,218.81 0.00 6,848.03 6,848.03 9,710.52
Avance por mes 6,848.03
Avance acumulado 6,848.03
% DE AVANCE EJECUTADO POR MES 0.80% 1.13%
% DE AVANCE PROGRAMADO POR MES 45.06%
% DE AVANCE EJECUTADO ACUMULADO 0.80%
% DE AVANCE PROGRAMADO ACUMULADO 60.16%
CONTROL DE METRADOS EJECUTADOS
PROYECTO: MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I.E. N° 80621 LEONCIO PRADO, NIVEL SECUNDARIO DEL
CASERIO COLPA SECA, DISTRITO DE ANGASMARCA, SANTIAGO DE CHUCHO LA LIBERTAD

ENTIDAD: MUNICIPALIDAD DISTRITAL DE ANGASMARCA


UBICACIÓN: LA LIBERTAD - SANTIAGO DE CHUCO - ANGASMARCA - COLPA SECA
FECHA: 31-Oct-13
EJECUTADA:CONTRATISTAS GENERALES VELVAL S.A.C.
RESIDENTE : Ing. OSCAR O. REYES FLORES
SUPERVISOR : Ing. PAUL ERIC GUTIERREZ PACHECO

PART. SUB ANTERIOR ACTUAL ACUMULADO


DESCRIPCION UNID. METRAD. C.U.
Nº TOTAL METRAD. METRAD. METRAD.
1.00 ESTRUCTURAS
1.01 OBRAS PROVISIONALES
01.01.01 TRANSPORTE DE EQUIPO Y/O HERRAMIENTAS A OBRA GLB 1.00 4,000.00 4,000.00 0.60 0.40 1.00
01.01.03 ALMACEN DE OBRA M2 50.00 50.00 2,500.00 25.00 25.00 50.00
1.02 TRABAJOS PRELIMINARES
01.02.01 CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.40m UND 1.00 1,000.00 1,000.00 1.00 0.00 1.00
01.02.02 FLETE TERRESTRE GLB 1.00 77,000.00 77,000.00 0.40 0.50 0.90
01.02.03 DEMOLICION CONSTRUCCION EXISTENTE GLB 1.00 5,000.00 5,000.00 1.00 0.00 1.00
01.02.04 TRAZO Y REPLANTEO INICAL M2 415.00 2.99 1,240.85 415.00 0.00 415.00
1.03 MOVIMIENTO DE TIERRAS
01.03.01 CORTE MANUALEN TERRENO NORMAL H=0.60m M3 270.00 28.28 7,635.60 270.00 0.00 270.00
01.03.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS M3 118.03 24.96 2,946.03 118.03 0.00 118.03
01.03.03 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS Y VIGAS M3 63.30 24.96 1,579.97 63.30 0.00 63.30
01.03.04 RELLENO CON MATERIAL PROPIO M3 33.69 37.16 1,251.92 13.48 20.21 33.69
01.03.05 BASE DE AFIRMADO COMPACTADO A MANO H=0.15 m M2 382.95 11.00 4,212.45 0.00 382.95 382.95
01.03.06 ACARREO DE MATERIAL EXCEDENTE M3 507.90 19.97 10,142.76 507.90 0.00 507.90
01.03.07 ELIMINACION MATERIAL EXCEDENTE D=50 M M3 507.90 20.05 10,183.40 406.32 101.58 507.90
1.04 CONCRETO SIMPLE
01.04.01 CONCRETO SOLADO MEZCLA 1:12 CEMENTO-HORMIGON e=0.10 m. M2 3.78 27.58 104.25 3.78 0.00 3.78
01.04.02 CONCRETO FALSA ZAPATA 1:10 + 25% P.M. M3 30.63 151.86 4,651.47 30.63 0.00 30.63
01.04.03 CONCRETO CILOPEO PARA CIMIENTACION 1:10 + 30% P.G. M3 60.11 213.23 12,817.26 36.07 24.04 60.11
01.04.04 CONCRETO FALSO PISO e=4" DE CONCRETO 1:10 M2 263.04 70.06 18,428.58 0.00 263.04 263.04
1.05 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
01.05.01 SOBRECIMIENTO ARMADO
01.05.01.01 CONCRETO SOBRECIMIENTOS f'c=175 kg/cm2 M3 8.58 264.94 2,273.19 0.86 7.72 8.58
01.05.01.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOHASTA M2 94.86 37.28 3,536.38 9.49 85.37 94.86
01.05.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 KG 185.55 5.73 1,063.20 18.56 167.00 185.55
01.05.02 ZAPATAS
01.05.02.01 CONCRETO ZAPATAS f'c=210 kg/cm2 m3 49.11 311.62 15,303.66 49.11 0.00 49.11
01.05.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,109.12 5.73 6,355.26 1,109.12 0.00 1,109.12
01.05.03 VIGAS DE CIMENTACION
01.05.03.01 CONCRETO VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 10.04 275.65 2,767.53 7.03 3.01 10.04
01.05.03.02 ENCOFRADO EN VIGA DE CIMENTACION m2 30.16 22.73 685.54 21.11 9.05 30.16
01.05.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 2,554.16 5.73 14,635.34 2,554.16 0.00 2,554.16
01.05.04 COLUMNAS
01.05.04.01 CONCRETO COLUMNAS f'c=210 kg/cm2 m3 43.81 311.22 13,634.55 17.52 26.29 43.81
01.05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 361.02 53.35 19,260.42 144.41 216.61 361.02
01.05.04.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 8,368.13 5.73 47,949.38 8,368.13 0.00 8,368.13
01.05.05 VIGAS
01.05.05.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 55.51 340.36 18,893.38 0.00 33.31 33.31
01.05.05.02 ENCOFRADO y DESENCOFRADO EN VIGAS m2 467.11 47.37 22,127.00 0.00 280.27 280.27
01.05.05.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 9,915.93 5.73 56,818.28 0.00 5,949.56 5,949.56
01.05.06 LOSA ALIGERADA
01.05.06.01 CONCRETO LOSAS f'c= 210 kg/cm2 m3 14.50 317.44 4,602.88 0.00 14.50 14.50
01.05.06.02 ENCOFRADO Y DESENCOFRADO NORMAL DE LOSA ALIGERADA m2 161.14 27.38 4,412.01 0.00 161.14 161.14
01.05.06.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 754.60 5.73 4,323.86 0.00 754.60 754.60
01.05.06.04 LADRILLO PARA TECHO DE h=0.15 m und 1,450.22 2.39 3,466.03 0.00 1,450.22 1,450.22
2.00 ARQUITECTURA
2.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO LADRILLO K.K DE ARCILLA 18H ( 09x013x0.24) AMARRE DE CABEZA, m2 73.54 97.38 7,161.33 0.00 73.54 73.54
02.01.02 MURO LADRILLO K.K DE ARCILLA UNA CARAVISTA 18H AMARRE DE CABEZm2 121.89 97.38 11,869.65 0.00 121.89 121.89
02.01.03 MURO LADRILLO K.K DE ARCILLA UNA CARAVISTA 18H AMARRE DE SOGA,m2 38.50 74.19 2,856.32 0.00 38.50 38.50
02.01.04 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOG m2 107.45 60.10 6,457.75 0.00 107.45 107.45
3.00 INSTALACIONES ELECTRICAS
3.01 SALIDA PARA CENTRO DE LUZ pto 45.00 134.49 6,052.05 0.00 22.50 22.50
3.02 SALIDA PARA BRAQUETE pto 1.00 125.09 125.09 0.00 1.00 1.00
3.03 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE pto 16.00 93.67 1,498.72 0.00 8.00 8.00
3.04 SALIDA PARA INTERRUPTOR DE CONMUTACION pto 2.00 120.47 240.94 0.00 1.00 1.00
3.05 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PUESTA A TIERRA pto 28.00 73.25 2,051.00 0.00 14.00 14.00
RESUMEN GENERAL DE LA VALORIZACIÓN Nº 02

PROYECTO:
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I.E. N° 80621 LEONCIO PRADO, NIVEL SECUNDARIO DEL
CASERIO COLPA SECA, DISTRITO DE ANGASMARCA, SANTIAGO DE CHUCHO LA LIBERTAD
ENTIDAD: MUNICIPALIDAD DISTRITAL DE ANGASMARCA
UBICACIÓN: LA LIBERTAD - SANTIAGO DE CHUCO - ANGASMARCA - COLPA SECA
FECHA: 31-Oct-13
EJECUTADA:CONTRATISTAS GENERALES VELVAL S.A.C.
RESIDENTE : Ing. OSCAR O. REYES FLORES
SUPERVISOR : Ing. PAUL ERIC GUTIERREZ PACHECO

VALORIZACIÓN DEL 01 AL 31 DE OCTUBRE

ITEM CONCEPTO PARCIAL TOTAL

1.0.0 VALORIZACIÓN CONTRACTUAL


1.0.1 VALORIZACIÓN CONTRACTUAL 240,189.38
1.1.0 REINTEGRO
1.1.1 REAJUSTE RECONOCIDO 0

TOTAL MONTO BRUTO (A) 240,189.38

2.0.0 DESCUENTOS
2.1.0 AMORTIZACIÓN DEL ADELANTO DIRECTO
2.1.1 AMORTIZACIÓN DEL ADELANTO DIRECTO 0
2.3.0 AMORTIZACIÓN DEL ADELANTO DE MATERIALES
2.3.1 AMORTIZACIÓN DEL ADELANTO DE MATERIALES 0
2.4.0 DEDUCCIÓN QUE NO CORRESPONDE ADELANTO DIRECTO
2.4.1 DEDUCCIÓN QUE NO CORRESPONDE ADELANTO DIRECTO 0
2.5.0 DEDUCCIÓN QUE NO CORRESPONDE ADELANTO DE MATERIALES
2.5.1 DEDUCCIÓN QUE NO CORRESPONDE ADELANTO DE MATERIALES 0

TOTAL DESCUENTOS (B) 0

TOTAL NETO (A-B) 240,189.38


IGV 18% 43234.09

TOTAL A PAGAR AL CONTRATISTA 283,423.47

DETALLE DE LA VALORIZACIÓN Nº1


VALORIZACIÓN MES (V) 240,189.38
REINTEGROS (R ) 0
VALORIZACIÓN BRUTA (VB)= V+R 0
AMORTIZACIÓN POR ADELANTO (ADD) 0
VALORIZACIÓN NETA (VN=VB-AAD) 0
IGV (18% *VN) 43234.09
TOTAL (VN+IGV) 283,423.47
CRONOGRAMA DE AVANCE POR MES PROGRAMADO VS EJECUTADO

Avances por mes


EL 5 Sep. Al 30 Sep. Al 31 Oct. AL 30 Nov. Al 03 Dic.
AVANCE PROGRAMADO 0.00 130,041.71 388,083.78 325,933.65 17,159.68
AVANCE EJECUTADO 0.00 251,852.18 283,423.47

AVANCE POR MES PROGRAMADO VS EJECUTADO


450,000.00

400,000.00
388,083.78

350,000.00

325,933.65

300,000.00
283,423.47

250,000.00 251,852.18

AVANCE PROGRAMADO
AVANCE EJECUTADO
200,000.00

150,000.00
130,041.71

100,000.00

50,000.00

17,159.68
0.00 0.00
EL 5 Sep. Al 30 Sep. Al 31 Oct. AL 30 Nov. Al 03 Dic.
50,000.00

17,159.68
0.00 0.00
EL 5 Sep. Al 30 Sep. Al 31 Oct. AL 30 Nov. Al 03 Dic.

CRONOGRAMA DE AVANCES ACUMULADOS PROGRAMADO VS EJECUTADO

Avances acumulados
EL 5 Sep. Al 30 Sep. Al 31 Oct. AL 30 Nov. Al 03 Dic.
AVANCE PROGRAMADO 0.00 130,041.71 518,125.49 844,059.14 861,218.81
AVANCE EJECUTADO 0.00 251,852.18 542,232.86

AVANCES ACUMULADOS PROGRAMADOS VS EJECUTADOS


1,000,000.00

900,000.00
861,218.81
844,059.14
800,000.00

700,000.00

600,000.00

542,232.86
518,125.49 AVANCE PROGRAMADO
500,000.00
AVANCE EJECUTADO

400,000.00

300,000.00
251,852.18

200,000.00

130,041.71
100,000.00

0.00 0.00
EL 5 Sep. Al 30 Sep. Al 31 Oct. AL 30 Nov. Al 03 Dic.
251,852.18

200,000.00

130,041.71
100,000.00

0.00 0.00
EL 5 Sep. Al 30 Sep. Al 31 Oct. AL 30 Nov. Al 03 Dic.
PORCENTAJE DE AVANCE POR MES PROGRAMADO VS EJECUTADO

Porcentajes de avances mensuales


EL 5 Sep. Al 30 Sep. Al 31 Oct. AL 30 Nov. Al 03 Dic.
PORCENTAJE PROGRAMADO 0% 15.10% 45.06% 37.85% 1.99%
PORCENTAJE EJECUTADO 0% 29.24% 32.91%

PORCENTAJE DE AVANCE POR MES PROGRAMADO VS EJECUTADO


50%

45% 45.06%

40%
37.85%

35%
32.91%

30%
29.24%

25% PORCENTAJE PROGRAMADO


PORCENTAJE EJECUTADO

20%

15% 15.10%

10%

5%

1.99%
0% 0%
EL 5 Sep. Al 30 Sep. Al 31 Oct. AL 30 Nov. Al 03 Dic.
5%

1.99%
0% 0%
EL 5 Sep. Al 30 Sep. Al 31 Oct. AL 30 Nov. Al 03 Dic.

PORCENTAJE DE AVANCE ACUMULADO PROGRAMADO VS EJECUTADO

Porcentajes de avances acumulados


EL 5 Sep. Al 30 Sep. Al 31 Oct. AL 30 Nov. Al 03 Dic.
PORCENTAJE PROGRAMADO 0% 15.10% 60.16% 98.01% 100.00%
PORCENTAJE EJECUTADO 0% 29.24% 62.96%

PORCENTAJE DE AVANCES ACUMULADOS PROGRADO VS EJECUTADO


120%

100% 100.00%
98.01%

80%

62.96% PORCENTAJE PROGRAMADO


60% 60.16%
PORCENTAJE EJECUTADO

40%

29.24%

20%
15.10%

0% 0%
EL 5 Sep. Al 30 Sep. Al 31 Oct. AL 30 Nov. Al 03 Dic.
29.24%

20%
15.10%

0% 0%
EL 5 Sep. Al 30 Sep. Al 31 Oct. AL 30 Nov. Al 03 Dic.
CRONOGRAMA VALORIZADO PROGRAMADO
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I.E. N° 80621 LEONCIO PRADO, NIVEL SECUNDARIO DEL CASERIO COLPA SECA, DISTRITO DE ANGASMARCA, SANTIAGO DE CHUCHO LA LIBERTAD
OBRA

Cliente MUNICIPALIDAD DISTRITAL DE ANGASMARCA


Lugar LA LIBERTAD - SANTIAGO DE CHUCO - ANGASMARCA
PLAZO DE EJECUCION 90 DIAS CALENDARIOS

MESES

N° PARTIDAS MONTO DEL 05/09/13 AL DEL 01/10/13 AL DEL 01/11/13 AL DEL 01/12/13 AL TOTAL
30/09/13 31/10/13 30/11/13 03/12/13

ESTRUCTURAS
01 OBRAS PROVISIONALES 6,500.00 100%

6,500.00 6,500.00

02 TRABAJOS PRELIMINARES 84,240.85 70% 30%

58,968.60 25,272.26 84,240.85

03 MOVIMIENTO DE TIERRAS 37,952.13 80% 20%

30,361.70 7,590.43 37,952.13

04 OBRAS DE CONCRETO SIMPLE 36,001.56 100%

36,001.56 36,001.56
5 OBRAS DE CONCRETO ARMADO

05.01 SOBRECIMIENTO ARMADO 6,872.77 100%

6,872.77 6,872.77

05.02 ZAPATAS 21,658.92 100%

21,658.92 21,658.92

05.03 VIGAS DE CIMENTACION 18,088.41 100%

18,088.41 18,088.41

05.04 COLUMNAS 80,844.35 100%

80,844.35 80,844.35
05.05 VIGAS 97,838.66 80.00% 20%

78,270.93 19,567.73 97,838.66

05.06 LOSAS ALIGERADAS 16,804.78 60% 40%

10,082.87 6,721.91 16,804.78

05.07 ESCALERAS 6,520.42 20% 80%

1304.08 5216.34 6,520.42

06 ESTRUCTURAS DE MADERA 5,265.00 100%

5,265.00 5,265.00

07 COBERTURAS 14,928.15 100%

14,928.15 14,928.15

08 VARIOS 6,187.65 100%

6,187.65 6,187.65

ARQUITECTURA

01 MUROS Y TABIQUES 28,345.05 100%

28,345.05 28,345.05

02 REVOQUES, ENLUCIDOS Y MOLDURAS 42,958.65 100%

42,958.65 42,958.65

03 CIELO RASOS 33,728.80 100%

33,728.80 33,728.80
CRONOGRAMA VALORIZADO PROGRAMADO
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I.E. N° 80621 LEONCIO PRADO, NIVEL SECUNDARIO DEL CASERIO COLPA SECA, DISTRITO DE ANGASMARCA, SANTIAGO DE CHUCHO LA LIBERTAD
OBRA

Cliente MUNICIPALIDAD DISTRITAL DE ANGASMARCA


Lugar LA LIBERTAD - SANTIAGO DE CHUCO - ANGASMARCA
PLAZO DE EJECUCION 90 DIAS CALENDARIOS

MESES

N° PARTIDAS MONTO DEL 05/09/13 AL DEL 01/10/13 AL DEL 01/11/13 AL DEL 01/12/13 AL TOTAL
30/09/13 31/10/13 30/11/13 03/12/13

04 PISOS Y PAVIMENTOS 17,522.79 100%

17,522.79 17,522.79

05 ZOCALOS Y CONTRAZOCALOS 3,798.90 100%

3,798.90 3,798.90
6 CARPINTERIA EN MADERA

06.01 PUERTAS DE MADERA CEDRO NACIONAL 8,306.12 100%

8,306.12 8,306.12

06.02 VENTANAS DE MADERA 10,630.00 100%

10,630.00 10,630.00

07 VIDRIOS, CRISTALES Y SIMILARES 5,839.56 100%

5,839.56 5,839.56

08 PINTURAS 23,493.25 60% 40%

14,095.95 9,397.30 23,493.25

09 VARIOS 8,120.00 60% 40%

4,872.00 3,248.00 8,120.00

INSTALACIONES ELECTRICAS

01 INSTALACIONES ELECTRICAS 12,202.32 100%

12,202.32 12,202.32
COSTO DIRECTO 634,649.09 95,830.3 285,986.6 240,186.9 12,645.3 634,649.09
GASTOS GENERALES (10% ) 63,464.91 9,583.03 28,598.66 24,018.69 1,264.53 63,464.91
UTILIDAD (5%) 31,732.45 4,791.51 14,299.33 12,009.35 632.27 31,732.45
SUB TOTAL 729,846.45 110,204.84 328,884.56 276,214.96 14,542.10 729,846.45
IGV (18 % ) 131,372.36 19,836.87 59,199.22 49,718.69 2,617.58 131,372.36
VALOR REFERENCIAL 861,218.81 130,041.71 388,083.78 325,933.65 17,159.68 861,218.81

AVANCE PROGRAMADO POR MES 861,218.81 130,041.71 388,083.78 325,933.65 17,159.68 861,218.81
% DE AVANCE PROGRAMADO POR MES 15.10% 45.06% 37.85% 1.99% 100%
AVANCE PROGRAMADO ACUMULADO 130,041.71 518,125.49 844,059.14 861,218.81
% DE AVANCE PROGRAMADO ACUMULADO 100.00% 15.10% 60.16% 98.01% 100.00%
S10

Presupuesto
Presupuesto MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I.E. N° 80621 LEONCIO PRADO, NIVEL SECUNDARIO DEL CASERIO C
DISTRITO DE ANGASMARCA, SANTIAGO DE CHUCHO LA LIBERTAD

Cliente
Lugar

Item Descripción Und


01 OBRAS PROVISIONALES
01.01 TRANSPORTE DE EQUIPO,HERRAMIENTAS Y MATERIALES A OBRA glb
01.02 ALMACEN DE OBRA m2
02 TRABAJOS PRELIMINARES
02.01 CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.40m und
02.02 FLETE TERRESTRE glb
02.03 DEMOLICION CONSTRUCCION EXISTENTE glb
02.04 TRAZO Y REPLANTEO INICAL m2
03 MOVIMIENTO DE TIERRAS
03.01 CORTE MANUALEN TERRENO NORMAL H=0.60m m3
03.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3
03.03 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS Y VIGAS m3
03.04 RELLENO CON MATERIAL PROPIO m3
03.05 BASE DE AFIRMADO COMPACTADO A MANO H=0.15 m m2
03.06 ACARREO DE MATERIAL EXCEDENTE m3
03.07 ELIMINACION MATERIAL EXCEDENTE D=50 M m3
04 OBRAS DE CONCRETO SIMPLE
04.01 CONCRETO SOLADO MEZCLA 1:12 CEMENTO-HORMIGON e=0.10 m. m2
04.02 CONCRETO FALSA ZAPATA 1:10 + 25% P.M. m3
04.03 CONCRETO CILOPEO PARA CIMIENTACION 1:10 + 30% P.G. m3
04.04 CONCRETO FALSO PISO e=4" DE CONCRETO 1:10 m2
05 OBRAS DE CONCRETO ARMADO
05.01 SOBRECIMIENTO ARMADO
05.01.01 CONCRETO SOBRECIMIENTOS f'c=175 kg/cm2 m3
05.01.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOHASTA 0.45m m2
05.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg
05.02 ZAPATAS
05.02.01 CONCRETO ZAPATAS f'c=210 kg/cm2 m3
05.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg
05.03 VIGAS DE CIMENTACION
05.03.01 CONCRETO VIGAS DE CIMENTACION f'c=210 kg/cm2 m3
05.03.02 ENCOFRADO EN VIGA DE CIMENTACION m2
05.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg
05.04 COLUMNAS
05.04.01 CONCRETO COLUMNAS f'c=210 kg/cm2 m3
05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2
05.04.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg
05.05 VIGAS
05.05.01 CONCRETO VIGAS f'c=210 kg/cm2 m3
05.05.02 ENCOFRADO y DESENCOFRADO EN VIGAS m2
05.05.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg
05.06 LOSAS ALIGERADAS
05.06.01 CONCRETO LOSAS f'c= 210 kg/cm2 m3
05.06.02 ENCOFRADO Y DESENCOFRADO NORMAL DE LOSA ALIGERADA m2
05.06.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg
05.06.04 LADRILLO PARA TECHO DE h=0.15 m und
05.07 ESCALERAS
05.07.01 CONCRETO ESCALERAS f´c=210 kg/cm2 m3
05.07.02 ENCOFRADO NORMAL EN ESCALERA m2
05.07.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg
06 ESTRUCTURAS DE MADERA
06.01 TIJERAL DE MADERA und
06.02 CORREAS DE MADERA DE 2.5"X3" m
07 COBERTURAS
07.01 PLANCHA FIBRAFORTE und
07.02 CUMBRERA DE FIBRAFORTE m
07.03 MONTAJE DE COBERTURA glb
08 VARIOS
08.01 CANALETA DE PVC m
08.02 JUNTAS SISMICAS m
01 MUROS Y TABIQUES
01.01 MURO LADRILLO K.K DE ARCILLA 18H ( 09x013x0.24) AMARRE DE CABEZA, JUNTA 1.5 cm. m2
MORTERO 1:1:5
01.02 MURO LADRILLO K.K DE ARCILLA UNA CARAVISTA 18H AMARRE DE CABEZA, JUNTA 1.5 cm. m2
MORTERO 1:1:5
01.03 MURO LADRILLO K.K DE ARCILLA UNA CARAVISTA 18H AMARRE DE SOGA, JUNTA 1.5 cm. m2
MORTERO 1:1:5
01.04 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUNTA 1.5 cm. m2
MORTERO 1:1:5
02 REVOQUES, ENLUCIDOS Y MOLDURAS
02.01 TARRAJEO MUROS EXTERIORES m2
02.02 TARRAJEO MUROS INTERIORES m2
02.03 TARRAJEO COLUMNAS m2
02.04 TARRAJEO DE VIGAS m2
02.05 DERRAMES A=0.15 m.MORTERO 1:5 m
02.06 REVESTIMIENTO DE ESCALERAS m2
03 CIELO RASOS
03.01 CIELORRASO CON MEZCLA 1:5 (C:A) m2
03.02 CIELORRASO DE MADERA SUPER BOARD m2
04 PISOS Y PAVIMENTOS
04.01 CONTRAPISO DE 2" m2
04.02 CONCRETO VEREDAS f'c=140 kg/cm2 INC ENCOFRADO m2
05 ZOCALOS Y CONTRAZOCALOS
05.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.10-0.20 m m
06 CARPINTERIA DE MADERA
06.01 PUERTAS DE MADERA CEDRO NACIONAL
06.01.01 PUERTA DE MADERA P1 und
06.01.02 PUERTA DE MADERA P2 und
06.01.03 PUERTA DE MADERA P3 und
06.01.04 PUERTA DE MADERA P4 und
06.02 VENTANAS DE MADERA
06.02.01 VENTANA DE MADERA -V1 und
06.02.02 VENTANA DE MADERA -V2 und
06.02.03 VENTANA DE MADERA -V3 und
06.02.04 VENTANA DE MADERA -V4 und
06.02.05 VENTANA DE MADERA -VA1 und
06.02.06 VENTANA DE MADERA -VA2 und
06.02.07 VENTANA DE MADERA -VA3 und
06.02.08 VENTANA DE MADERA -VA4 und
07 VIDRIOS, CRISTALES Y SIMILARES
07.01 VIDRIO SEMIDOBLE INCOLORO CRUDO p2
08 PINTURAS
08.01 PINTURA ESMALTE EN CONTRAZOCALOS m
08.02 PINTURA LATEX DOS MANOS EN INTERIORES Y EXTERIORES m2
08.03 PINTURA LATEX DOS MANOS EN CIELO RASO m2
08.04 PINTURA LATEX DOS MANOS EN VESTIDURAS DE DERRAMES m
08.05 PINTURA LATEX DOS MANOS EN VIGAS Y COLUMNAS m2
09 VARIOS
09.01 PIZARRA ACRILICA und
09.02 COCINA MEJORADA PARA LEÑA und
09.03 MUEBLE DE CONCRETO und
01 INSTALACIONES ELECTRICAS
01.01 SALIDA PARA CENTRO DE LUZ pto
01.02 SALIDA PARA BRAQUETE pto
01.03 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE pto
01.04 SALIDA PARA INTERRUPTOR DE CONMUTACION pto
01.05 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PUESTA A TIERRA pto
01.06 TABLEROS GENERAL und
01.07 SUB TABLEROS DE DISTRIBUCION und
01.08 PUESTA A TIERRA und
COSTO DIRECTO
GASTOS GENERALES 10%
UTILIDAD 5%

SUBTOTAL
IMPUESTO (IGV 18%)

TOTAL PRESUPUESTO
1

O, NIVEL SECUNDARIO DEL CASERIO COLPA SECA,

Costo al

Metrado Precio S/.


6,500.00
1.00 4,000.00 4,000.00
50.00 50.00 2,500.00
84,240.85
1.00 1,000.00 1,000.00
1.00 77,000.00 77,000.00
1.00 5,000.00 5,000.00
415.00 2.99 1,240.85
37,952.13
270.00 28.28 7,635.60
118.03 24.96 2,946.03
63.30 24.96 1,579.97
33.69 37.16 1,251.92
382.95 11.00 4,212.45
507.90 19.97 10,142.76
507.90 20.05 10,183.40
36,001.56
3.78 27.58 104.25
30.63 151.86 4,651.47
60.11 213.23 12,817.26
263.04 70.06 18,428.58
248,628.31
6,872.77
8.58 264.94 2,273.19
94.86 37.28 3,536.38
185.55 5.73 1,063.20
21,658.92
49.11 311.62 15,303.66
1,109.12 5.73 6,355.26
18,088.41
10.04 275.65 2,767.53
30.16 22.73 685.54
2,554.16 5.73 14,635.34
80,844.35
43.81 311.22 13,634.55
361.02 53.35 19,260.42
8,368.13 5.73 47,949.38
97,838.66
55.51 340.36 18,893.38
467.11 47.37 22,127.00
9,915.93 5.73 56,818.28
16,804.78
14.50 317.44 4,602.88
161.14 27.38 4,412.01
754.60 5.73 4,323.86
1,450.22 2.39 3,466.03
6,520.42
5.25 303.52 1,593.48
32.42 68.47 2,219.80
472.45 5.73 2,707.14
5,265.00
1.00 1,000.00 1,000.00
426.50 10.00 4,265.00
14,928.15
151.85 54.00 8,199.90
48.55 15.00 728.25
1.00 6,000.00 6,000.00
6,187.65
97.10 52.43 5,090.95
108.80 10.08 1,096.70
28,345.05
73.54 97.38 7,161.33

121.89 97.38 11,869.65


38.50 74.19 2,856.32

107.45 60.10 6,457.75

42,958.65
123.29 17.44 2,150.18
485.94 17.10 8,309.57
250.64 32.18 8,065.60
448.44 42.75 19,170.81
333.32 11.58 3,859.85
50.31 27.88 1,402.64
33,728.80
167.27 36.98 6,185.64
423.22 65.08 27,543.16
17,522.79
445.58 22.24 9,909.70
119.91 63.49 7,613.09
3,798.90
422.10 9.00 3,798.90
18,936.12
8,306.12
6.00 878.67 5,272.02
1.00 1,278.67 1,278.67
1.00 878.67 878.67
1.00 876.76 876.76
10,630.00
4.00 339.35 1,357.40
8.00 338.20 2,705.60
2.00 339.35 678.70
2.00 369.35 738.70
4.00 359.35 1,437.40
8.00 309.35 2,474.80
2.00 309.35 618.70
2.00 309.35 618.70
5,839.56
1,234.58 4.73 5,839.56
23,493.25
422.10 4.63 1,954.32
632.30 11.22 7,094.41
590.49 8.71 5,143.17
333.32 6.89 2,296.57
699.08 10.02 7,004.78
8,120.00
6.00 270.00 1,620.00
1.00 2,500.00 2,500.00
1.00 4,000.00 4,000.00
12,202.32
45.00 134.49 6,052.05
1.00 125.09 125.09
16.00 93.67 1,498.72
2.00 120.47 240.94
28.00 73.25 2,051.00
1.00 96.29 96.29
3.00 306.29 918.87
1.00 1,219.36 1,219.36
634,649.09
63,464.91
31,732.45

729,846.45
131,372.36

861,218.81