VALORIZACION N° 01

CONTRATISTA : CONSORCIO PROYECTO SELVA


SUB CONTRATISTA : CONSTRUYENDO MEJOR E.I.R.L.
RUC :20601143225
CTA BCP : 2552599747025
OBRA : I.E. SANTA ROSA DE PIJUAYAL
PRESUPUESTO CONTRATADO DE OBRA S/117,297.73
ING ENCARGADO DE OBRA : ING. LUIS ALEXANDER MELENDEZ FLORES MONTO TOTAL CONTRATAD
PLAZO DE EJECUCION
VALORIZACION DE OBRA No.: 1 CORRESPONDIENTE A LA PRIMERA QUINCENA FACTOR DE RELACION

VALORIZACION
P. UNIT. PRESUP BASE ANTERIOR ACTUAL ACUMULADO
ITEM. DESCRIPCION DE PARTIDA UND. METRADO
S/. S/. % METRADO S/. % METRADO S/. % METRADO
OBRAS CIVILES
01.00.00 MOVIMIENTO DE TIERRAS
01.01.00 EXCAVACION DE TERRENO P/PLATEA DE CIMENTACION CON MAQUINARIA M3 800.42 20.00 16,196.24 0% 0.00 0.00 85% 680.36 13,607.14 85% 680.36
01.02.00 EXCAVACION MANUAL DE ZAPATAS DE PEDESTALES M3 40.47 - - 0% 0.00 0.00 0% 0.00 0.00 0% 0.00
01.03.00 PERFILADO Y COMPACTADO DE SUBRASANTE M2 2000.98 3.39 6,073.59 0% 0.00 0.00 17% 340.17 1,153.16 17% 340.17
01.04.00 RELLENO Y COMPACTADO CON MATERIAL PROPIO M3 300.15 20.00 7,591.99 0% 0.00 0.00 0% 0.00 0.00 0% 0.00
01.05.00 ELIMINACION DE MATERIAL EXEDENTE M3 717.00 20.00 7,591.99 0% 0.00 0.00 0% 0.00 0.00 0% 0.00
02.00.00 OBRAS DE CONCRETO
02.01.00 SOLADOS
02.01.01 CONCRETO SIMPLE F'C=100 KG/CM2 SOLADOS DE ZAPATAS DE PEDESTALES M2 338.35 - - 0% 0.00 0.00 20% 67.67 0.00 20% 67.67
02.02.00 PLATEA DE CIMENTACION
02.02.01 CONCRETO F'C=175 KG/CM2 EN PLATEA DE CIMENTACION M3 525.26 70.00 35,429.28 0% 0.00 0.00 0% 0.00 0.00 0% 0.00
02.02.02 ACERO DE REFUERZO F'Y=4200 KG/CM2 KG 17930.01 0.85 18,343.61 0% 0.00 0.00 17% 3,048.10 2,590.89 17% 3,048.10
02.03.00 PEDESTALES
02.03.01 CONCRETO F'C=210 KG/CM2 EN PEDESTALES M3 28.99 70.00 2,425.97 0% 0.00 0.00 0% 0.00 0.00 0% 0.00
02.03.02 ENCOFRADO Y DESENCOFRADO DE PEDESTALES UND 428.00 30.00 13,920.00 0% 0.00 0.00 0% 0.00 0.00 0% 0.00
02.03.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 KG 7608.39 0.85 4,587.81 0% 0.00 0.00 30% 2,282.52 1,940.14 30% 2,282.52
03.00.00 COLOCACION DE ANCLAJES
03.01.00 COLOCACION DE PERNOS DE ANCLAJE KG 6043.84 0.85 5,137.26 0% 0.00 0.00 0% 0.00 0.00 0% 0.00
04.00.00 SOLAQUEO DE PEDESTALES, INCLUYE LIMPIEZA DE PERNOS
04.01.00 SOLAQUEO DE PEDESTALES, INCLUYE LIMPIEZA DE PERNOS GL 0.00 - - 0% 0.00 0.00 0% 0.00 0.00 0% 0.00

TOTAL COSTO DIRECTO 117,297.73 0.00 19,291.32


RETENCION 5% 5,864.89 0.00 964.57
SUB TOTAL 1 111,432.85 0.00 18,326.75
DESCUECTO POR ADELANTO Y/O DEDUCTIVO -10% (11,729.77) 0.00 (1,929.13)
SUB TOTAL 2 99,703.07 0.00 16,397.62
IGV 0% 0.00 0.00 0.00
TOTAL A FACTURAR 99,703.07 0.00 16,397.62

PORCENTAJE DE AVANCE DE OBRA 0.00% 16.45%


----------------------------------------------------------- ---------------------------------------------------------------------
ING.
SUB CONTRATISTA ENCARGADO DE OBRA
ONTRATADO S/117,297.73
CION 60 D. C.
CION 1.00000 ZONA DE INGRESO DE DATOS %

1.0 2.0 3.0 4.0


DO SALDO POR VALORIZAR Jun-18 Jul-18 Aug-18 Sep-18
S/. % METRADO S/.

13,607.14 15% 120.06 2,589.10 100.00%


0.00 100% 40.47 0.00
1,153.16 83% 1,660.81 4,920.43 100.00%
0.00 100% 300.15 7,591.99
0.00 100% 717.00 7,591.99

0.00 80% 270.68 0.00

0.00 100% 525.26 35,429.28 35.00%


2,590.89 83% 14,881.91 15,752.72 50.00%

0.00 100% 28.99 2,425.97


0.00 100% 428.00 13,920.00
1,940.14 70% 5,325.87 2,647.67 50.00%

0.00 100% 6,043.84 5,137.26 35.00%

0.00 #DIV/0! 0.00 0.00

19,291.32 98,006.41
964.57 4,900.32
18,326.75 93,106.09
(1,929.13) (9,800.64)
16,397.62 83,305.45
0.00 0.00
16,397.62 83,305.45

16.45% 83.55%