ETAPA 1 ETAPA 2 ETAPA 3 ETAPA 1 ETAPA 2 ETAPA 3

ITEM DESCRIPCIÓN PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL


2 SANEAMIENTO - REDES S/ 3,156,738.69 S/ 2,152,874.66 S/ 2,692,199.57 S/ 2,483,987.39 S/ 1,116,495.75 S/ 1,345,778.35
COSTO DIRECTO S/ 3,156,738.69 S/ 2,152,874.66 S/ 2,692,199.57 S/ 2,483,987.39 S/ 1,116,495.75 S/ 1,345,778.35
GASTOS GENERALES 7% S/ 220,971.71 S/ 150,701.23 S/ 188,453.97 S/ 173,879.12 S/ 78,154.70 S/ 94,204.48
UTILIDAD 6% S/ 189,404.32 S/ 129,172.48 S/ 161,531.97 S/ 149,039.24 S/ 66,989.75 S/ 80,746.70
SUBTOTAL S/ 3,567,114.72 S/ 2,432,748.37 S/ 3,042,185.52 S/ 2,806,905.75 S/ 1,261,640.20 S/ 1,520,729.54
IGV 18% S/ 642,080.65 S/ 437,894.71 S/ 547,593.39 S/ 505,243.04 S/ 227,095.24 S/ 273,731.32
TOTAL S/ 4,209,195.37 S/ 2,870,643.07 S/ 3,589,778.91 S/ 3,312,148.79 S/ 1,488,735.44 S/ 1,794,460.85 A FAVOR
S/10,669,617.35 S/6,595,345.08 S/4,074,272.27
FONDO MI VIVIENDA ACTUALIZADO
ETAPA 1 ETAPA 2 ETAPA 3 ETAPA 1 ETAPA 2 ETAPA 3
P.U P.U
ITEM DESCRIPCIÓN UNIDAD METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL

2 SANEAMIENTO - REDES
2.1 RED DE AGUA POTABLE
2.1.1 OBRAS PROVISIONALES
2.1.1.1 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPOS glb 15,000.00 1.00 15,000.00 1.00 15,000.00 1.00 15,000.00 20,000.00 0.10 2,000.00 0.10 2,000.00 0.10 2,000.00
2.1.1.2 glb 22,500.00 1.00 22,500.00 1.00 22,500.00 1.00 22,500.00 45,000.00 0.10 4,500.00 0.10 4,500.00 0.10 4,500.00
2.1.1.3 AIRE ACONDICIONADO PARA OFICINAS 18000btu glb 4,500.00 1.00 4,500.00 1.00 4,500.00 1.00 4,500.00 4,500.00 0.10 450.00 0.10 450.00 0.10 450.00
2.1.1.4 CASETA DE GUARDIANIA, ALMACEN mes 1,500.00 6.00 9,000.00 6.00 9,000.00 6.00 9,000.00 1,500.00 3.60 5,400.00 3.60 5,400.00 3.60 5,400.00
2.1.1.5 EXAMENES MEDICOS OCUPACIONALES DE INGRESO Y SALIDA glb 10,000.00 1.00 10,000.00 1.00 10,000.00 1.00 10,000.00 - - - - - - -
2.1.1.6 ALQUILER DE VIVIENDA PARA PERSONAL OBRERO Y STAFF mes 1,500.00 6.00 9,000.00 6.00 9,000.00 6.00 9,000.00 - - - - - - -
2.1.1.7 MOVILIDAD DIARIA PARA TRASLADO DE PERSONAL mes 1,500.00 6.00 9,000.00 6.00 9,000.00 6.00 9,000.00 - - - - - - -
2.1.1.8 ENERGIA PARA LA OBRA mes 1,000.00 6.00 6,000.00 6.00 6,000.00 6.00 6,000.00 - - - - - -
2.1.1.9 AGUA PARA PERSONAL DE OBRA mes 1,500.00 6.00 9,000.00 6.00 9,000.00 6.00 9,000.00 - - - - - - -
2.1.1.10 COMEDOR Y VESTUARIOS mes 1,500.00 6.00 9,000.00 6.00 9,000.00 6.00 9,000.00 - - - - - - -
2.1.1.11 BAÑOS QUIMICOS PARA OBRA, LAVA MANOS, Y BEBEDEROS mes 2,500.00 6.00 15,000.00 6.00 15,000.00 6.00 15,000.00 - - - - - - -
2.1.1.12 PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO mes 2,500.00 6.00 15,000.00 6.00 15,000.00 6.00 15,000.00 - - - - - - -
2.1.1.13 MITIGACIÓN AMBIENTAL glb 3,500.00 1.00 3,500.00 1.00 3,500.00 1.00 3,500.00 - - - - - - -
2.1.1.14 SEÑALIZACIÓN PERMANENTE EN OBRA y CONTROL DE POLUCION mes 3,500.00 6.00 21,000.00 6.00 21,000.00 6.00 21,000.00 - - - - - - -
2.1.1.15 IMPLEMENTOS DE SEGURIDAD EN OBRA glb 20,000.00 1.00 20,000.00 1.00 20,000.00 1.00 20,000.00 - - - - - - -
2.1.1.16 SEGURIDAD PARA LA OBRA mes 3,500.00 6.00 21,000.00 6.00 21,000.00 6.00 21,000.00 - - - - - - -
2.1.2 RED DE AGUA POTABLE
2.1.2.1 TRAZO Y REPLANTEO
2.1.2.1.1 TRAZO, NIVELES Y REPLANTEO m 1.65 4,305.09 7,103.40 2,743.28 4,526.41 3,100.37 5,115.61 4.30 3,317.90 14,266.95 2,852.18 12,264.37 3,225.39 13,869.17
2.1.2.2 MITIGACIÓN AMBIENTAL Y SEGURIDAD
2.1.2.2.1 MALLA PLASTICA SEÑALIZADORA P/LIMITE SEGURIDAD DE OBRA m 0.50 8,610.18 4,305.09 5,486.56 2,743.28 6,200.74 3,100.37 1.52 6,635.79 10,086.40 5,704.36 8,670.63 6,450.78 9,805.18
2.1.2.2.2 SEÑALIZACIÓN PERMANENTE EN OBRA y CONTROL DE POLUCION mes - - - - - - - 4,515.15 3.60 16,254.54 3.60 16,254.54 3.60 16,254.54
2.1.2.2.3 MITIGACIÓN AMBIENTAL glb - - - - - - - 5,000.00 0.10 500.00 0.10 500.00 0.10 500.00
2.1.2.3 MOVIMIENTO DE TIERRAS
2.1.2.3.1 m 8.00 4,305.09 34,440.72 2,743.28 21,946.24 3,100.37 24,802.96 8.62 3,317.90 28,600.25 2,852.18 24,585.79 3,225.39 27,802.85
2.1.2.3.2 INFILTRACION HIDRAULICA PARA EXCAVACIONES m 4.41 4,305.09 18,985.45 2,743.28 12,097.86 3,100.37 13,672.63 - - - - - - -
2.1.2.3.3 REFINE Y COMPACTACION FONDO DE ZANJA P/RED DE AGUA m 8.25 4,305.09 35,516.99 2,743.28 22,632.06 3,100.37 25,578.05 3.16 3,317.90 10,484.55 2,852.18 9,012.89 3,225.39 10,192.23
2.1.2.3.4 CAMA DE ARENA P/TUBERIA E=0.10 M ZANJA A = 0.60m P/RED DE AGUA m 2.14 4,305.09 9,212.89 2,743.28 5,870.62 3,100.37 6,634.79 4.73 3,317.90 15,693.64 2,852.18 13,490.81 3,225.39 15,256.09

2.1.2.3.5 m 5.58 4,305.09 24,022.40 2,743.28 15,307.50 3,100.37 17,300.06 7.14 3,317.90 23,689.77 2,852.18 20,364.57 3,225.39 23,029.28

2.1.2.3.6 m 10.50 4,305.09 45,203.45 2,743.28 28,804.44 3,100.37 32,553.89 5.95 3,317.90 19,741.48 2,852.18 16,970.47 3,225.39 19,191.06
2.1.2.3.7 ELIMINACION MATERIAL EXCEDENTE DE ZANJA, D=1.15 Km m - m3 8.59 4,305.09 36,980.72 2,743.28 23,564.78 3,100.37 26,632.18 8.18 165.89 1,357.02 142.61 1,166.54 161.27 1,319.18
2.1.2.4 SUM. E INSTALACION DE TUBERIA PVC NTP ISO 4422
2.1.2.4.1 SUMINISTRO TUBERIA PVC NTP ISO 16422, DN 110 MM m 15.26 2,955.09 45,094.67 2,605.18 39,755.05 2,966.58 45,270.01 41.26 3,131.73 129,215.18 2,518.10 103,897.00 3,055.81 126,082.88
2.1.2.4.2 INSTALACION TUBERIA PVC NTP ISO 16422, DN 110 MM INCL. P.H. m 7.24 2,955.09 21,394.85 2,605.18 18,861.50 2,966.58 21,478.04 5.05 3,131.73 15,815.24 2,518.10 12,716.43 3,055.81 15,431.86
2.1.2.4.3 SUMINISTRO TUBERIA PVC NTP ISO 16422, DN 160 MM m 23.55 1,350.00 31,792.50 138.10 3,252.26 133.79 3,150.75 45.42 186.17 8,455.61 140.49 6,381.06 - -
2.1.2.4.4 INSTALACION TUBERIA PVC NTP ISO 16422, DN 160 MM INCL. P.H. m 12.83 1,350.00 17,320.50 138.10 1,771.82 133.79 1,716.53 5.05 186.17 940.13 140.49 709.47 - -
2.1.2.4.5 SUMINISTRO TUBERIA PVC NTP ISO 16422, DN 250 MM m - - - - - - - 85.71 - - 66.47 5,696.72 - -
2.1.2.4.6 INSTALACION TUBERIA PVC NTP ISO 16422, DN 250 MM INCL. P.H. m - - - - - - - 5.68 - - 66.47 377.52 - -
2.1.2.4.7 SUMINISTRO TUBERIA PVC NTP ISO 16422, DN 315 MM m - - - - - - - 107.98 - - 127.12 13,726.46 169.68 18,322.05
2.1.2.4.8 INSTALACION TUBERIA PVC NTP ISO 16422, DN 315 MM INCL. P.H. m - - - - - - - 6.47 - - 127.12 822.47 169.68 1,097.83
2.1.2.5 VALVULAS Y ACCESORIOS
2.1.2.5.1 TEE PVC C-10 DIAM. 110MM und 112.00 23.00 2,576.00 20.00 2,240.00 2.00 224.00 94.19 23.00 2,166.37 20.00 1,883.80 21.00 1,977.99
2.1.2.5.2 TEE PVC C-10 DIAM. 160MM und 161.26 1.00 161.26 2.00 322.52 4.00 645.04 137.58 - - - - - -
2.1.2.5.3 CRUZ PVC C-10 DIAM. 110MM und 145.00 3.00 435.00 3.00 435.00 4.00 580.00 162.92 3.00 488.76 - - - -
2.1.2.5.4 CRUZ PVC C-10 DIAM. 160MM und 433.51 6.00 2,601.06 1.00 433.51 6.00 2,601.06 290.58 - - 1.00 290.58 - -
2.1.2.5.5 CRUZ PVC C-10 DIAM. 250MM und - - - - - - - 454.03 - - - - - -
2.1.2.5.6 CRUZ PVC C-10 DIAM. 315MM und - - - - - - - 572.08 - - 1.00 572.08 2.00 1,144.16
2.1.2.5.7 CODO 45° PVC C-10 DIAM. 110MM und - - - - - - - 260.00 - - 1.00 260.00 - -
2.1.2.5.8 CODO 90° PVC C-10 DIAM. 110MM und 70.00 1.00 70.00 - - - - 391.00 7.00 2,737.00 5.00 1,955.00 7.00 2,737.00
2.1.2.5.9 CODO 90° PVC C-10 DIAM. 315 MM und - - - - - - - 325.00 - - - - - -
2.1.2.5.10 CODO 22.5° PVC C-10 DIAM. 110MM und - - - - - - - 25.00 - - 2.00 50.00 - -
2.1.2.5.11 TAPÓN PVC C-10 DIAM. 110MM und 45.00 11.00 495.00 6.00 270.00 1.00 45.00 50.14 14.00 701.96 2.00 100.28 1.00 50.14
2.1.2.5.12 CODO 90° PVC C-10 DIAM. 160MM und 91.41 1.00 91.41 - - - - 145.56 - - - - - -
2.1.2.5.13 REDUCCION DE 160MM A 110MM und 59.62 10.00 596.20 4.00 238.48 10.00 596.20 117.59 1.00 117.59 3.00 352.77 - -
2.1.2.5.14 TAPÓN PVC C-10 DIAM. 160MM und 70.84 - - 1.00 70.84 1.00 70.84 86.27 - - - - - -
2.1.2.5.15 TEE PVC C-10 DIAM. 200MM und 233.00 - - - - - - 243.37 - - - - - -
2.1.2.5.16 TEE PVC C-10 DIAM. 315MM und - - - - - - - 383.30 - - 2.00 766.60 1.00 383.30
2.1.2.5.17 CODO 90° PVC C-10 DIAM. 200MM und 147.28 - - - - - - 223.36 - - - - - -
2.1.2.5.18 CODO 45° PVC C-10 DIAM. 200MM und 151.02 - - - - - - 228.36 - - - - - -
2.1.2.5.19 REDUCCION DE 200MM A 160MM und 83.89 - - - - - - 147.76 - - - - - -
2.1.2.5.20 REDUCCION DE 250MM A 160MM und - - - - - - - 184.70 - - 1.00 184.70 - -
2.1.2.5.21 REDUCCION DE 315MM A 110MM und - - - - - - - 200.15 - - 2.00 400.30 5.00 1,000.75
2.1.2.5.22 REDUCCION DE 315MM A 160MM und - - - - - - - 232.72 - - 1.00 232.72 - -
2.1.2.5.23 REDUCCION DE 315MM A 250MM und - - - - - - - 257.90 - - 1.00 257.90 - -
2.1.2.5.24 DADOS DE CONCRETO f´c=175 Kg/cm2 und - - - - - - - 81.62 48.00 3,917.76 42.00 3,428.04 37.00 3,019.94
2.1.2.5.25 INSTALACION DE ACCESORIOS PVC DN 110 MM und 31.05 38.00 1,179.90 29.00 900.45 7.00 217.35 -
2.1.2.5.26 INSTALACION DE ACCESORIOS PVC DN 160 MM und 31.05 18.00 558.90 8.00 248.40 21.00 652.05 -
2.1.2.5.27 CONCRETO PARA ANCLAJES DE ACCESORIO 110 MM m3 336.00 4.75 1,596.00 3.63 1,218.00 0.88 294.00 - - - - - - -
2.1.2.5.28 CONCRETO PARA ANCLAJES DE ACCESORIO 160 MM m3 336.00 2.25 756.00 1.00 336.00 2.63 882.00 - - - - - - -
2.1.2.5.29 ENCOFRADO Y DESENCOFRADO PARA ANCLAJES DE ACCESORIOS 110 MM m2 32.99 28.50 940.22 21.75 717.53 5.25 173.20 - - - - - - -
2.1.2.5.30 ENCOFRADO Y DESENCOFRADO PARA ANCLAJES DE ACCESORIOS 160 MM m2 32.99 13.50 445.37 6.00 197.94 15.75 519.59 - - - - - - -
2.1.2.5.31 SUM. E INT. DE VALVULA COMPUERTA DE HIERRO DUCTIL DN 110MM und 846.75 22.00 18,628.50 18.00 15,241.50 18.00 15,241.50 859.62 26.00 22,350.12 28.00 24,069.36 39.00 33,525.18
2.1.2.5.32 SUM. E INT. DE VALVULA COMPUERTA DE HIERRO DUCTIL DN 160MM und 709.35 1.00 709.35 1.00 709.35 1.00 709.35 1,117.94 - - - - - -
2.1.2.5.33 SUM. E INT. DE VALVULA COMPUERTA DE HIERRO DUCTIL DN 200MM und 912.84 - - - - - - 2,193.83 - - - - - -
2.1.2.5.34 SUM. E INST. DE HIDRANTES und 1,800.00 2.00 3,600.00 2.00 3,600.00 2.00 3,600.00 1,470.06 - - 2.00 2,940.12 - -
2.1.2.6 CONEXIONES DOMICILIARIAS
2.1.2.6.1 EXCAVACION MANUAL PARA CONEX. EN RED DE AGUA 110MM Y 160MM m 17.80 2,970.00 52,866.00 2,240.00 39,872.00 3,000.00 53,400.00 25.99 2,929.66 76,141.74 1,607.07 41,767.73 1,465.27 38,082.49
2.1.2.6.2 INFILTRACION HIDRAULICA PARA EXCAVACIONES m 4.41 2,970.00 13,097.70 2,240.00 9,878.40 3,000.00 13,230.00 - - - - - - -
2.1.2.6.3 REFINE DEL DE FONDO DE ZANJA EN CONEX. AGUA m 3.50 2,970.00 10,395.00 2,240.00 7,840.00 3,000.00 10,500.00 3.16 2,929.66 9,257.71 1,607.07 5,078.34 1,465.27 4,630.27
2.1.2.6.4 CAMA DE ARENA MANUAL E=0.10m m 6.40 2,970.00 19,008.00 2,240.00 14,336.00 3,000.00 19,200.00 4.73 2,929.66 13,857.27 1,607.07 7,601.44 1,465.27 6,930.75
2.1.2.6.5 m - 2,970.00 - 2,240.00 - 3,000.00 - 7.14 2,929.66 20,917.74 1,607.07 11,474.47 1,465.27 10,462.06
2.1.2.6.6 RELLENO C/MAT. PROPIO, COMPACT. C/EQ. EN T.NAT. P/CONEX. DOMIC. m 17.50 2,970.00 51,975.00 2,240.00 39,200.00 3,000.00 52,500.00 5.95 2,929.66 17,431.45 1,607.07 9,562.06 1,465.27 8,718.39
2.1.2.6.7 ELIMINACION MATERIAL EXCEDENTE DE ZANJA, D=1.15 Km m - m3 8.60 2,970.00 25,542.00 2,240.00 19,264.00 3,000.00 25,800.00 8.18 146.48 1,198.23 80.35 657.29 73.26 599.30
2.1.2.6.8 CONEXIONES DOMICILIARIAS DE AGUA DE 110mm A 1/2" und - - - - - - - 346.89 594.00 206,052.66 448.00 155,406.72 590.00 204,665.10
2.1.2.6.9 CONEXIONES DOMICILIARIAS DE AGUA DE 160mm A 1/2" und - - - - - - - 504.57 - - - - - -
2.1.2.6.10 CONEXIONES DOMICILIARIAS DE AGUA DE 315mm A 1/2" und - - - - - - - 993.37 - - - - 10.00 9,933.70
2.1.2.6.11 SUM. E INST. TUB. P/CONEXIÓN DOMICILIARIA AGUA DN = 1/2" (21mm), INC. P.H. m 12.40 2,970.00 36,828.00 2,240.00 27,776.00 3,000.00 37,200.00 - - - - - - -
2.1.2.6.12 SUM. E INST. ACCESORIOS P/CONEXIÓN DOMIC. AGUA 110MM TUB. PVC S/P C-10 D und 225.00 563.00 126,675.00 443.00 99,675.00 580.00 130,500.00 - - - - - - -
2.1.2.6.13 SUM. E INST. ACCESORIOS P/CONEXIÓN DOMIC. AGUA 160MM TUB. PVC S/P C-10 D und 225.00 31.00 6,975.00 5.00 1,125.00 20.00 4,500.00 - - - - - - -
2.1.2.6.14 SUM. E INST. MEDIDOR P/CONEXIÓN DOMIC. AGUA DN 21MM und 110.00 594.00 65,340.00 448.00 49,280.00 600.00 66,000.00 - - - - - - -
2.2 RED DE ALCANTARILLADO
2.2.1 OBRAS PROVISIONALES
2.2.1.1 TRAZO, NIVELES Y REPLANTEO EN RED DE ALCANTARILLADO m 2.50 4,260.49 10,651.23 2,190.67 5,476.68 3,100.37 7,750.93 10.58 4,930.71 52,166.91 1,783.39 18,868.27 2,305.69 24,394.20
2.2.1.2 MALLA PLASTICA SEÑALIZADORA P/LIMITE SEGURIDAD DE OBRA m 2.40 8,520.98 20,450.35 4,381.34 10,515.22 6,200.74 14,881.78 1.52 9,861.42 14,989.36 3,566.78 5,421.51 4,611.38 7,009.30
2.2.2 MOVIMIENTO DE TIERRAS
2.2.2.1 EXCAVACIONES
2.2.2.1.1 EXCAVACION DE ZANJA C/EQUIPO Hasta H=1.50m, T.N. m - - - - - - - 8.62 3,421.09 29,489.80 1,783.39 15,372.82 2,305.69 19,875.05
2.2.2.1.2 EXCAVACION DE ZANJA C/EQUIPO H=1.51m - 2.00m, TN m - - - - - - - 10.78 280.00 3,018.40 - - - -
2.2.2.1.3 EXCAVACION DE ZANJA C/EQUIPO H=2.01m - 2.50m, TN m 135.00 1,500.00 202,500.00 600.00 81,000.00 950.00 128,250.00 16.16 230.66 3,727.47 - - - -
2.2.2.1.4 EXCAVACION DE ZANJA C/EQUIPO H=2.51m - 3.00m, TN m 180.00 1,250.00 225,000.00 650.00 117,000.00 850.00 153,000.00 21.55 685.03 14,762.40 - - - -
2.2.2.1.5 EXCAVACION DE ZANJA C/EQUIPO H=3.01m - 3.50m, TN m 200.00 1,510.49 302,098.00 940.67 188,134.00 1,300.37 260,074.00 32.33 305.70 9,883.28 - - - -
2.2.2.1.6 EXCAVACION DE ZANJA C/EQUIPO H=3.51m - 4.00m, TN m - - - - - - - 54.11 8.23 445.33 - - - -
2.2.2.1.7 EXCAVACION DE ZANJA C/EQUIPO H=4.01m - 4.50m, TN m - - - - - - - 112.40 - - - - - -
2.2.2.1.8 EXCAVACION DE ZANJA C/EQUIPO H=4.51m - 5.00m, TN m - - - - - - - 131.13 - - - - - -
2.2.2.2 REFINE, NIVELACIÓN DE FONDO DE ZANJA
2.2.2.2.1 REFINE, NIVELACION Y COMPACTACION FONDO DE ZANJA P/TUBERIA m 10.85 4,260.49 46,226.32 2,190.67 23,768.77 3,100.37 33,639.01 3.16 4,930.71 15,581.04 1,783.39 5,635.51 2,305.69 7,285.98
2.2.2.3 CAMA DE APOYO PARA TUBERÍAS
2.2.2.3.1 CAMA DE ARENA P/TUBERIA E=0.10 M m 14.23 4,260.49 60,626.77 2,190.67 31,173.23 3,100.37 44,118.27 4.73 4,930.71 23,322.26 1,783.39 8,435.43 2,305.69 10,905.91
2.2.2.4 RELLENO COMPACTADO DE ZANJAS

2.2.2.4.1 m 22.50 4,260.49 95,861.03 2,190.67 49,290.08 3,100.37 69,758.33 7.14 4,930.71 35,205.27 1,783.39 12,733.40 2,305.69 16,462.63

2.2.2.4.2 m - - - - - - - 5.95 3,421.09 20,355.49 1,783.39 10,611.17 2,305.69 13,718.86


2.2.2.4.3 RELLENO C/MATERIAL PROPIO COMPACTADO EN ZANJA C/EQUIPO H=1.51-2.00m m - - - - - - - 7.42 280.00 2,077.60 - - - -
2.2.2.4.4 RELLENO C/MATERIAL PROPIO COMPACTADO C/EQUIPO EN ZANJA H=2.01-2.50m m 36.80 1,500.00 55,200.00 600.00 22,080.00 950.00 34,960.00 7.96 230.66 1,836.05 - - - -
2.2.2.4.5 RELLENO C/MATERIAL PROPIO COMPACTADO C/EQUIPO EN ZANJA H=2.51-3.00m m 45.40 1,250.00 56,750.00 650.00 29,510.00 850.00 38,590.00 8.63 685.03 5,911.81 - - - -
2.2.2.4.6 RELLENO C/MATERIAL PROPIO COMPACTADO C/EQUIPO EN ZANJA H=3.01-3.50m m 49.14 1,510.49 74,225.48 940.67 46,224.52 1,300.37 63,900.18 10.45 305.70 3,194.57 - - - -
2.2.2.4.7 RELLENO C/MATERIAL PROPIO COMPACTADO C/EQUIPO EN ZANJA H=3.51-4.00m m - - - - - - - 14.04 8.23 115.55 - - - -
2.2.2.4.8 RELLENO C/MATERIAL PROPIO COMPACTADO C/EQUIPO EN ZANJA H=4.01-4.50m m - - - - - - - 17.82 - - - - - -
2.2.2.4.9 RELLENO C/MATERIAL PROPIO COMPACTADO C/EQUIPO EN ZANJA H=4.51-5.00m m - - - - - - - 21.43 - - - - - -
2.2.2.5 ELIMINACIÓN DE MATERIAL EXCEDENTE
2.2.2.5.1 ELIMINACION MATERIAL EXCEDENTE DE ZANJA, D=1.15 Km m - m3 8.59 4,260.49 36,597.61 2,190.67 18,817.86 3,100.37 26,632.18 8.18 882.60 7,219.67 319.23 2,611.30 558.54 4,568.86
2.2.3 SUM. E INSTALACION DE TUBERIA PVC
2.2.3.1 SUM. TUBERIA PVC NTP ISO 21138, S20 DN 200 MM m 22.25 4,305.09 95,788.25 2,743.28 61,037.98 3,100.37 68,983.23 58.62 3,287.29 192,700.94 1,783.39 104,542.32 2,305.69 135,159.55
2.2.3.2 INST. TUBERIA PVC NTP ISO 21138, S20 DN 200 MM + P.H. m 11.81 4,305.09 50,843.11 2,743.28 32,398.14 3,100.37 36,615.37 6.23 3,287.29 20,479.82 1,783.39 11,110.52 2,305.69 14,364.45
2.2.3.3 SUM. TUBERIA PVC NTP ISO 21138, S20 DN 250 MM m - - - - - - - 136.00 33.30 4,528.80 - - - -
2.2.3.4 INST. TUBERIA PVC NTP ISO 21138, S20 DN 250 MM + P.H. m - - - - - - - 6.23 33.30 207.46 - - - -
2.2.3.5 SUM. TUBERIA PVC NTP ISO 21138, S20 DN 315 MM m - - - - - - - 315.00 200.62 63,195.30 - - - -
2.2.3.6 INST. TUBERIA PVC NTP ISO 21138, S20 DN 315 MM + P.H. m - - - - - - - 9.00 200.62 1,805.58 - - - -
2.2.3.7 SUM. TUBERIA PVC NTP ISO 21138, S20 DN 355 MM m - - - - - - - 420.00 - - - - - -
2.2.3.8 INST. TUBERIA PVC NTP ISO 21138, S20 DN 355 MM + P.H. m - - - - - - - 10.00 - - - - - -
2.2.3.9 SUM. TUBERIA PVC NTP ISO 21138, S20 DN 400 MM m - - - - - - - 480.00 1,409.50 676,560.00 - - - -
2.2.3.10 INST. TUBERIA PVC NTP ISO 21138, S20 DN 400 MM + P.H. m - - - - - - - 11.00 1,409.50 15,504.50 - - - -
2.2.4 BUZONES DE REGISTRO
2.2.4.1 BUZON DE INSPECCION Di=1.20 m, TN, Hasta 1.50 m PROF. und - - - - - - - 1,453.35 65.00 94,467.75 24.00 34,880.40 26.00 37,787.10
2.2.4.2 BUZON DE INSPECCION Di=1.20 m, TN, H=1.51m - 2.00 m und - - - - - - - 2,456.70 5.00 12,283.50 - - - -
2.2.4.3 BUZON DE INSPECCION Di=1.20 m, TN, H=2.01m - 2.50 m und - - - - - - - 3,306.70 3.00 9,920.10 - - - -
2.2.4.4 BUZON DE INSPECCION Di=1.20 m, TN, H=2.51m - 3.00 m und - - - - - - - 3,606.70 6.00 21,640.20 - - - -
2.2.4.5 BUZON DE INSPECCION Di=1.20 m, TN, H=3.01m - 3.50 m und 3,450.35 57.00 196,669.95 55.00 189,769.25 55.00 18
ETAPA 1 ETAPA 2 ETAPA 3 ETAPA 1 ETAPA 2 ETAPA 3
P.U P.U
ITEM DESCRIPCIÓN UNIDAD METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL

2 SANEAMIENTO - REDES
2.2.6.6 RELLENO C/MAT. PROPIO, COMPACT. C/EQ. EN T.NAT. P/CONEX. DOMIC. m 37.02 2,970.00 109,949.40 2,240.00 82,924.80 3,000.00 111,060.00 5.95 2,418.93 14,392.63 2,378.98 14,154.93 2,453.93 14,600.88
2.2.6.7 ELIMINACION MATERIAL EXCEDENTE DE ZANJA, D=1.15 Km m - m3 8.59 2,970.00 25,512.30 2,240.00 19,241.60 3,000.00 25,770.00 8.18 332.87 2,722.88 163.26 1,335.47 205.31 1,679.44
2.2.6.8 CONEXIONES DOMICILIARIAS PARA DESAGÜE COMPLETA und - - - - - - - 486.94 594.00 289,242.36 448.00 218,149.12 600.00 292,164.00
2.2.6.9 SUM. E INST. CAJA DOMICILIARIA und 206.46 594.00 122,637.24 448.00 92,494.08 600.00 123,876.00 - - - - - - -
2.2.6.10 SUM. E INST. ACCESORIOS und 138.54 594.00 82,292.76 448.00 62,065.92 600.00 83,124.00 - - - - - - -
2.2.6.11 CONEX. DOMIC. DESAGÜE TUB. PVC-U NTP ISO 4435, S20 DN 160 MM m 22.90 2,970.00 68,013.00 2,240.00 51,296.00 3,000.00 68,700.00 - - - - - - -
COSTO DIRECTO S/ 3,156,738.69 S/ 2,152,874.66 S/ 2,692,199.57 S/ 2,483,987.39 S/ 1,116,495.75 S/ 1,345,778.35
GASTOS GENERALES 7% S/ 220,971.71 S/ 150,701.23 S/ 188,453.97 S/ 173,879.12 S/ 78,154.70 S/ 94,204.48
UTILIDAD 6% S/ 189,404.32 S/ 129,172.48 S/ 161,531.97 S/ 149,039.24 S/ 66,989.75 S/ 80,746.70
SUBTOTAL S/ 3,567,114.72 S/ 2,432,748.37 S/ 3,042,185.52 S/ 2,806,905.75 S/ 1,261,640.20 S/ 1,520,729.54
IGV 18% S/ 642,080.65 S/ 437,894.71 S/ 547,593.39 S/ 505,243.04 S/ 227,095.24 S/ 273,731.32
TOTAL S/ 4,209,195.37 S/ 2,870,643.07 S/ 3,589,778.91 S/ 3,312,148.79 S/ 1,488,735.44 S/ 1,794,460.85
S/10,669,617.35 S/6,595,345.08
ITEM

2
2.1
2.1.1
2.1.1.1

2.1.1.2

2.1.1.3
2.1.1.4
2.1.1.5
2.1.1.6
2.1.1.7
2.1.1.8
2.1.1.9
2.1.1.10
2.1.1.11
2.1.1.12
2.1.1.13
2.1.1.14
2.1.1.15
2.1.1.16
2.1.2
2.1.2.1
2.1.2.1.1
2.1.2.2
2.1.2.2.1
2.1.2.2.2
2.1.2.2.3
2.1.2.3

2.1.2.3.1
2.1.2.3.2
2.1.2.3.3
2.1.2.3.4

2.1.2.3.5

2.1.2.3.6
2.1.2.3.7
2.1.2.4
2.1.2.4.1
2.1.2.4.2
2.1.2.4.3
2.1.2.4.4
2.1.2.4.5
2.1.2.4.6
2.1.2.4.7
2.1.2.4.8
2.1.2.5
2.1.2.5.1
2.1.2.5.2
2.1.2.5.3
2.1.2.5.4
2.1.2.5.5
2.1.2.5.6
2.1.2.5.7
2.1.2.5.8
2.1.2.5.9
2.1.2.5.10
2.1.2.5.11
2.1.2.5.12
2.1.2.5.13
2.1.2.5.14
2.1.2.5.15
2.1.2.5.16
2.1.2.5.17
2.1.2.5.18
2.1.2.5.19
2.1.2.5.20
2.1.2.5.21
2.1.2.5.22
2.1.2.5.23
2.1.2.5.24
2.1.2.5.25
2.1.2.5.26
2.1.2.5.27
2.1.2.5.28
2.1.2.5.29
2.1.2.5.30
2.1.2.5.31
2.1.2.5.32
2.1.2.5.33
2.1.2.5.34
2.1.2.6
2.1.2.6.1
2.1.2.6.2
2.1.2.6.3
2.1.2.6.4
2.1.2.6.5
2.1.2.6.6
2.1.2.6.7
2.1.2.6.8
2.1.2.6.9
2.1.2.6.10
2.1.2.6.11
2.1.2.6.12
2.1.2.6.13
2.1.2.6.14
2.2
2.2.1
2.2.1.1
2.2.1.2
2.2.2
2.2.2.1
2.2.2.1.1
2.2.2.1.2
2.2.2.1.3
2.2.2.1.4
2.2.2.1.5
2.2.2.1.6
2.2.2.1.7
2.2.2.1.8
2.2.2.2
2.2.2.2.1
2.2.2.3
2.2.2.3.1
2.2.2.4

2.2.2.4.1

2.2.2.4.2
2.2.2.4.3
2.2.2.4.4
2.2.2.4.5
2.2.2.4.6
2.2.2.4.7
2.2.2.4.8
2.2.2.4.9
2.2.2.5
2.2.2.5.1
2.2.3
2.2.3.1
2.2.3.2
2.2.3.3
2.2.3.4
2.2.3.5
2.2.3.6
2.2.3.7
2.2.3.8
2.2.3.9
2.2.3.10
2.2.4
2.2.4.1
2.2.4.2
2.2.4.3
2.2.4.4
2.2.4.5
2.2.4.6
2.2.4.7
2.2.4.8
2.2.5
2.2.5.1
2.2.5.2
2.2.5.3
2.2.6
2.2.6.1
2.2.6.2
2.2.6.3
2.2.6.4
2.2.6.5
2.2.6.6
2.2.6.7
2.2.6.8
2.2.6.9
2.2.6.10
2.2.6.11
DESCRIPCIÓN UNIDAD

SANEAMIENTO - REDES
RED DE AGUA POTABLE
OBRAS PROVISIONALES
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPOS glb
CAMPAMENTO INC. (OFICINA, ALMACEN, COMEDOR, VESTUARIOS, CASETA VIG.,
glb
SS.HH.)
AIRE ACONDICIONADO PARA OFICINAS 18000btu glb
CASETA DE GUARDIANIA, ALMACEN mes
EXAMENES MEDICOS OCUPACIONALES DE INGRESO Y SALIDA glb
ALQUILER DE VIVIENDA PARA PERSONAL OBRERO Y STAFF mes
MOVILIDAD DIARIA PARA TRASLADO DE PERSONAL mes
ENERGIA PARA LA OBRA mes
AGUA PARA PERSONAL DE OBRA mes
COMEDOR Y VESTUARIOS mes
BAÑOS QUIMICOS PARA OBRA, LAVA MANOS, Y BEBEDEROS mes
PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO mes
MITIGACIÓN AMBIENTAL glb
SEÑALIZACIÓN PERMANENTE EN OBRA y CONTROL DE POLUCION mes
IMPLEMENTOS DE SEGURIDAD EN OBRA glb
SEGURIDAD PARA LA OBRA mes
RED DE AGUA POTABLE
TRAZO Y REPLANTEO
TRAZO, NIVELES Y REPLANTEO m
MITIGACIÓN AMBIENTAL Y SEGURIDAD
MALLA PLASTICA SEÑALIZADORA P/LIMITE SEGURIDAD DE OBRA m
SEÑALIZACIÓN PERMANENTE EN OBRA y CONTROL DE POLUCION mes
MITIGACIÓN AMBIENTAL glb
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA C/EQUIPO T. NORMAL, A=0.60m, H=1.20m P/RED DE AGUA
m
110MM Y 160MM
INFILTRACION HIDRAULICA PARA EXCAVACIONES m
REFINE Y COMPACTACION FONDO DE ZANJA P/RED DE AGUA m
CAMA DE ARENA P/TUBERIA E=0.10 M ZANJA A = 0.60m P/RED DE AGUA m
RELLENO PROTECTOR C/MATERIAL SELECCIONADO HASTA H=0.15m,S/CLAVE P/RED
m
DE AGUA POTABLE
RELLENO C/MATERIAL PROPIO COMPACTADO C/EQUIPO EN ZANJA HASTA H=1.50m m
ELIMINACION MATERIAL EXCEDENTE DE ZANJA, D=1.15 Km m - m3
SUM. E INSTALACION DE TUBERIA PVC NTP ISO 4422
SUMINISTRO TUBERIA PVC NTP ISO 16422, DN 110 MM m
INSTALACION TUBERIA PVC NTP ISO 16422, DN 110 MM INCL. P.H. m
SUMINISTRO TUBERIA PVC NTP ISO 16422, DN 160 MM m
INSTALACION TUBERIA PVC NTP ISO 16422, DN 160 MM INCL. P.H. m
SUMINISTRO TUBERIA PVC NTP ISO 16422, DN 250 MM m
INSTALACION TUBERIA PVC NTP ISO 16422, DN 250 MM INCL. P.H. m
SUMINISTRO TUBERIA PVC NTP ISO 16422, DN 315 MM m
INSTALACION TUBERIA PVC NTP ISO 16422, DN 315 MM INCL. P.H. m
VALVULAS Y ACCESORIOS
TEE PVC C-10 DIAM. 110MM und
TEE PVC C-10 DIAM. 160MM und
CRUZ PVC C-10 DIAM. 110MM und
CRUZ PVC C-10 DIAM. 160MM und
CRUZ PVC C-10 DIAM. 250MM und
CRUZ PVC C-10 DIAM. 315MM und
CODO 45° PVC C-10 DIAM. 110MM und
CODO 90° PVC C-10 DIAM. 110MM und
CODO 90° PVC C-10 DIAM. 315 MM und
CODO 22.5° PVC C-10 DIAM. 110MM und
TAPÓN PVC C-10 DIAM. 110MM und
CODO 90° PVC C-10 DIAM. 160MM und
REDUCCION DE 160MM A 110MM und
TAPÓN PVC C-10 DIAM. 160MM und
TEE PVC C-10 DIAM. 200MM und
TEE PVC C-10 DIAM. 315MM und
CODO 90° PVC C-10 DIAM. 200MM und
CODO 45° PVC C-10 DIAM. 200MM und
REDUCCION DE 200MM A 160MM und
REDUCCION DE 250MM A 160MM und
REDUCCION DE 315MM A 110MM und
REDUCCION DE 315MM A 160MM und
REDUCCION DE 315MM A 250MM und
DADOS DE CONCRETO f´c=175 Kg/cm2 und
INSTALACION DE ACCESORIOS PVC DN 110 MM und
INSTALACION DE ACCESORIOS PVC DN 160 MM und
CONCRETO PARA ANCLAJES DE ACCESORIO 110 MM m3
CONCRETO PARA ANCLAJES DE ACCESORIO 160 MM m3
ENCOFRADO Y DESENCOFRADO PARA ANCLAJES DE ACCESORIOS 110 MM m2
ENCOFRADO Y DESENCOFRADO PARA ANCLAJES DE ACCESORIOS 160 MM m2
SUM. E INT. DE VALVULA COMPUERTA DE HIERRO DUCTIL DN 110MM und
SUM. E INT. DE VALVULA COMPUERTA DE HIERRO DUCTIL DN 160MM und
SUM. E INT. DE VALVULA COMPUERTA DE HIERRO DUCTIL DN 200MM und
SUM. E INST. DE HIDRANTES und
CONEXIONES DOMICILIARIAS
EXCAVACION MANUAL PARA CONEX. EN RED DE AGUA 110MM Y 160MM m
INFILTRACION HIDRAULICA PARA EXCAVACIONES m
REFINE DEL DE FONDO DE ZANJA EN CONEX. AGUA m
CAMA DE ARENA MANUAL E=0.10m m
RELLENO C/SELECCIONADO h=15 cm, COMPACT. C/EQ. EN T.NAT. P/CONEX. DOMIC. m
RELLENO C/MAT. PROPIO, COMPACT. C/EQ. EN T.NAT. P/CONEX. DOMIC. m
ELIMINACION MATERIAL EXCEDENTE DE ZANJA, D=1.15 Km m - m3
CONEXIONES DOMICILIARIAS DE AGUA DE 110mm A 1/2" und
CONEXIONES DOMICILIARIAS DE AGUA DE 160mm A 1/2" und
CONEXIONES DOMICILIARIAS DE AGUA DE 315mm A 1/2" und
SUM. E INST. TUB. P/CONEXIÓN DOMICILIARIA AGUA DN = 1/2" (21mm), INC. P.H. m
SUM. E INST. ACCESORIOS P/CONEXIÓN DOMIC. AGUA 110MM TUB. PVC S/P C-10 DN 21 und
SUM. E INST. ACCESORIOS P/CONEXIÓN DOMIC. AGUA 160MM TUB. PVC S/P C-10 DN 21 und
SUM. E INST. MEDIDOR P/CONEXIÓN DOMIC. AGUA DN 21MM und
RED DE ALCANTARILLADO
OBRAS PROVISIONALES
TRAZO, NIVELES Y REPLANTEO EN RED DE ALCANTARILLADO m
MALLA PLASTICA SEÑALIZADORA P/LIMITE SEGURIDAD DE OBRA m
MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACION DE ZANJA C/EQUIPO Hasta H=1.50m, T.N. m
EXCAVACION DE ZANJA C/EQUIPO H=1.51m - 2.00m, TN m
EXCAVACION DE ZANJA C/EQUIPO H=2.01m - 2.50m, TN m
EXCAVACION DE ZANJA C/EQUIPO H=2.51m - 3.00m, TN m
EXCAVACION DE ZANJA C/EQUIPO H=3.01m - 3.50m, TN m
EXCAVACION DE ZANJA C/EQUIPO H=3.51m - 4.00m, TN m
EXCAVACION DE ZANJA C/EQUIPO H=4.01m - 4.50m, TN m
EXCAVACION DE ZANJA C/EQUIPO H=4.51m - 5.00m, TN m
REFINE, NIVELACIÓN DE FONDO DE ZANJA
REFINE, NIVELACION Y COMPACTACION FONDO DE ZANJA P/TUBERIA m
CAMA DE APOYO PARA TUBERÍAS
CAMA DE ARENA P/TUBERIA E=0.10 M m
RELLENO COMPACTADO DE ZANJAS
RELLENO PROTECTOR C/MATERIAL SELECCIONADO HASTA H=0.15m,S/CLAVE P/RED
m
DE DESAGÜE
RELLENO C/MATERIAL PROPIO COMPACTADO C/EQUIPO EN ZANJA HASTA H=1.50m m
RELLENO C/MATERIAL PROPIO COMPACTADO EN ZANJA C/EQUIPO H=1.51-2.00m m
RELLENO C/MATERIAL PROPIO COMPACTADO C/EQUIPO EN ZANJA H=2.01-2.50m m
RELLENO C/MATERIAL PROPIO COMPACTADO C/EQUIPO EN ZANJA H=2.51-3.00m m
RELLENO C/MATERIAL PROPIO COMPACTADO C/EQUIPO EN ZANJA H=3.01-3.50m m
RELLENO C/MATERIAL PROPIO COMPACTADO C/EQUIPO EN ZANJA H=3.51-4.00m m
RELLENO C/MATERIAL PROPIO COMPACTADO C/EQUIPO EN ZANJA H=4.01-4.50m m
RELLENO C/MATERIAL PROPIO COMPACTADO C/EQUIPO EN ZANJA H=4.51-5.00m m
ELIMINACIÓN DE MATERIAL EXCEDENTE
ELIMINACION MATERIAL EXCEDENTE DE ZANJA, D=1.15 Km m - m3
SUM. E INSTALACION DE TUBERIA PVC
SUM. TUBERIA PVC NTP ISO 21138, S20 DN 200 MM m
INST. TUBERIA PVC NTP ISO 21138, S20 DN 200 MM + P.H. m
SUM. TUBERIA PVC NTP ISO 21138, S20 DN 250 MM m
INST. TUBERIA PVC NTP ISO 21138, S20 DN 250 MM + P.H. m
SUM. TUBERIA PVC NTP ISO 21138, S20 DN 315 MM m
INST. TUBERIA PVC NTP ISO 21138, S20 DN 315 MM + P.H. m
SUM. TUBERIA PVC NTP ISO 21138, S20 DN 355 MM m
INST. TUBERIA PVC NTP ISO 21138, S20 DN 355 MM + P.H. m
SUM. TUBERIA PVC NTP ISO 21138, S20 DN 400 MM m
INST. TUBERIA PVC NTP ISO 21138, S20 DN 400 MM + P.H. m
BUZONES DE REGISTRO
BUZON DE INSPECCION Di=1.20 m, TN, Hasta 1.50 m PROF. und
BUZON DE INSPECCION Di=1.20 m, TN, H=1.51m - 2.00 m und
BUZON DE INSPECCION Di=1.20 m, TN, H=2.01m - 2.50 m und
BUZON DE INSPECCION Di=1.20 m, TN, H=2.51m - 3.00 m und
BUZON DE INSPECCION Di=1.20 m, TN, H=3.01m - 3.50 m und
BUZON DE INSPECCION Di=1.20 m, TN, H=3.51m - 4.00 m und
BUZON DE INSPECCION Di=1.20 m, TN, H=4.01m - 4.50 m und
BUZON DE INSPECCION Di=1.20 m, TN, H=4.51m - 5.00 m und
OTROS
PASE PEATONAL und
DADOS DE CONCRETO f´c=175 Kg/cm2 und
CAIDA ESPECIAL TIPO I und
CONEXIONES DOMICILIARIAS
EXCAVACION DE ZANJA C/EQUIPO T. NORMAL P/CONEX. DOMIC. m
INFILTRACION HIDRAULICA PARA EXCAVACIONES m
REFINE Y COMPACTACION FONDO DE ZANJA P/CONEX. DOMIC. m
CAMA DE ARENA P/TUBERIA E=0.10 M ZANJA A = 0.60m m
RELLENO C/SELECCIONADO h=15 cm, COMPACT. C/EQ. EN T.NAT. P/CONEX. DOMIC. m
RELLENO C/MAT. PROPIO, COMPACT. C/EQ. EN T.NAT. P/CONEX. DOMIC. m
ELIMINACION MATERIAL EXCEDENTE DE ZANJA, D=1.15 Km m - m3
CONEXIONES DOMICILIARIAS PARA DESAGÜE COMPLETA und
SUM. E INST. CAJA DOMICILIARIA und
SUM. E INST. ACCESORIOS und
CONEX. DOMIC. DESAGÜE TUB. PVC-U NTP ISO 4435, S20 DN 160 MM m
FONDO MI VIVIENDA ACTUALIZADO
1° Etapa 2° Etapa 3° Etapa 1° Etapa 2° Etapa 3° Etapa

1.00 1.00 1.00 0.10 0.10 0.10

1.00 1.00 1.00 0.10 0.10 0.10

1.00 1.00 1.00 0.10 0.10 0.10


6.00 6.00 6.00 3.60 3.60 3.60
1.00 1.00 1.00 - - -
6.00 6.00 6.00 - - -
6.00 6.00 6.00 - - -
6.00 6.00 6.00 - - -
6.00 6.00 6.00 - - -
6.00 6.00 6.00 - - -
6.00 6.00 6.00 - - -
6.00 6.00 6.00 - - -
1.00 1.00 1.00 - - -
6.00 6.00 6.00 - - -
1.00 1.00 1.00 - - -
6.00 6.00 6.00 - - -

4,305.09 2,743.28 3,100.37 3,317.90 2,852.18 3,225.39

8,610.18 5,486.56 6,200.74 6,635.79 5,704.36 6,450.78


- - - 3.60 3.60 3.60
- - - 0.10 0.10 0.10

4,305.09 2,743.28 3,100.37 3,317.90 2,852.18 3,225.39


4,305.09 2,743.28 3,100.37 - - -
4,305.09 2,743.28 3,100.37 3,317.90 2,852.18 3,225.39
4,305.09 2,743.28 3,100.37 3,317.90 2,852.18 3,225.39

4,305.09 2,743.28 3,100.37 3,317.90 2,852.18 3,225.39

4,305.09 2,743.28 3,100.37 3,317.90 2,852.18 3,225.39


4,305.09 2,743.28 3,100.37 165.89 142.61 161.27

2,955.09 2,605.18 2,966.58 3,131.73 2,518.10 3,055.81


2,955.09 2,605.18 2,966.58 3,131.73 2,518.10 3,055.81
1,350.00 138.10 133.79 186.17 140.49 -
1,350.00 138.10 133.79 186.17 140.49 -
- - - - 66.47 -
- - - - 66.47 -
- - - 127.12 169.68
- - - 127.12 169.68
23.00 20.00 2.00 23.00 20.00 21.00
1.00 2.00 4.00 - - -
3.00 3.00 4.00 3.00 - -
6.00 1.00 6.00 - 1.00 -
- - - - - -
- - - - 1.00 2.00
- - - - 1.00 -
1.00 - - 7.00 5.00 7.00
- - - - - -
- - - - 2.00 -
11.00 6.00 1.00 14.00 2.00 1.00
1.00 - - - - -
10.00 4.00 10.00 1.00 3.00 -
- 1.00 1.00 - - -
- - - - - -
- - - - 2.00 1.00
- - - - - -
- - - - - -
- - - - - -
- - - - 1.00 -
- - - - 2.00 5.00
- - - - 1.00 -
- - - - 1.00 -
- - - 48.00 42.00 37.00
38.00 29.00 7.00 - - -
18.00 8.00 21.00 - - -
4.75 3.63 0.88 - - -
2.25 1.00 2.63 - - -
28.50 21.75 5.25 - - -
13.50 6.00 15.75 - - -
22.00 18.00 18.00 26.00 28.00 39.00
1.00 1.00 1.00 - - -
- - - - - -
2.00 2.00 2.00 2.00 -

2,970.00 2,240.00 3,000.00 2,929.66 1,607.07 1,465.27


2,970.00 2,240.00 3,000.00 - - -
2,970.00 2,240.00 3,000.00 2,929.66 1,607.07 1,465.27
2,970.00 2,240.00 3,000.00 2,929.66 1,607.07 1,465.27
2,970.00 2,240.00 3,000.00 2,929.66 1,607.07 1,465.27
2,970.00 2,240.00 3,000.00 2,929.66 1,607.07 1,465.27
2,970.00 2,240.00 3,000.00 146.48 80.35 73.26
- - - 594.00 448.00 590.00
- - - - - -
- - - - - 10.00
2,970.00 2,240.00 3,000.00 - - -
563.00 443.00 580.00 - - -
31.00 5.00 20.00 - - -
594.00 448.00 600.00 - - -
4,260.49 2,190.67 3,100.37 4,930.71 1,783.39 2,305.69
8,520.98 4,381.34 6,200.74 9,861.42 3,566.78 4,611.38

- - - 3,421.09 1,783.39 2,305.69


- - - 280.00 - -
1,500.00 600.00 950.00 230.66 - -
1,250.00 650.00 850.00 685.03 - -
1,510.49 940.67 1,300.37 305.70 - -
- - - 8.23 - -
- - - - - -
- - - - - -

4,260.49 2,190.67 3,100.37 4,930.71 1,783.39 2,305.69

4,260.49 2,190.67 3,100.37 4,930.71 1,783.39 2,305.69

4,260.49 2,190.67 3,100.37 4,930.71 1,783.39 2,305.69

- - - 3,421.09 1,783.39 2,305.69


- - - 280.00 - -
1,500.00 600.00 950.00 230.66 - -
1,250.00 650.00 850.00 685.03 - -
1,510.49 940.67 1,300.37 305.70 - -
- - - 8.23 - -
- - - - - -
- - - - - -

4,260.49 2,190.67 3,100.37 882.60 319.23 558.54

4,305.09 2,743.28 3,100.37 3,287.29 1,783.39 2,305.69


4,305.09 2,743.28 3,100.37 3,287.29 1,783.39 2,305.69
- - - 33.30 - -
- - - 33.30 - -
- - - 200.62 - -
- - - 200.62 - -
- - - - - -
- - - - - -
- - - 1,409.50 - -
- - - 1,409.50 - -

- - - 65.00 24.00 26.00


- - - 5.00 - -
- - - 3.00 - -
- - - 6.00 - -
57.00 55.00 55.00 5.00 - -
- - - - - -
- - - - - -
- - - - - -
1.00 1.00 1.00 3.00 1.00 1.00
228.00 220.00 220.00 182.00 66.00 78.00
1.00 1.00 1.00 1.00 - -

2,970.00 2,240.00 3,000.00 2,418.93 2,378.98 2,453.93


2,970.00 2,240.00 3,000.00 - - -
2,970.00 2,240.00 3,000.00 2,418.93 2,378.98 2,453.93
2,970.00 2,240.00 3,000.00 2,418.93 2,378.98 2,453.93
- - - 2,418.93 2,378.98 2,453.93
2,970.00 2,240.00 3,000.00 2,418.93 2,378.98 2,453.93
2,970.00 2,240.00 3,000.00 332.87 163.26 205.31
- - - 594.00 448.00 600.00
594.00 448.00 600.00 - - -
594.00 448.00 600.00 - - -
2,970.00 2,240.00 3,000.00 - - -