Cost Purchased Equipment
Cost Purchased Equipment
74
Purchased equipment
Pump - 100 XCHG - 100
S 121.52 L/s S 140.00
a 3300 a 11000
b 48 b 115
n 1.2 n 1
Ce $ 23,526.49 Ce $ 34,398.77
Pump - 102 XCHG - 102
S 127.78 L/s S 240.00
a 3300 a 11000
b 48 b 115
n 1.2 n 1
Ce $ 24,726.80 Ce $ 48,996.03
Pump - 101 XCHG - 101
S 130.80 L/s S 22.60
a 3300 a 53000
b 48 b 69000
n 1.2 n 0.8
Ce $ 25,310.81 Ce $ 1,128,329.77
Distillation Column TOPPING XCHG - 102
Tw 0.0317 mS 200.00
Shell 152979 kg a 11000
a -10000 b 115
b 600 n 1
n 0.6 Ce $ 43,157.12
Platos 80800
XCHG - 103
Ce $ 1,072,756.13
S 28.24
Torre Flash
a 7000
Tw 0.048 mb 71000
Shell 19328 kg n 0.8
a -10000 Ce $ 1,313,523.89
b 600
XCHG - 103
n 0.6
Platos 8700 S 47.21
Ce $ 282,427.47 a 4900
b 720
Torre Flash
n 0.9
Tw 0.012 m Ce $ 35,563.65
Shell 3054 kg
a -10000
b 600
n 0.6
Platos 7400
Ce $ 90,595.57
Vessel
Shell 884 kg
a -10000
b 600
n 0.6
Ce $ 31,933.57
Purchased equipment
Pump - 100 XCHG - 100
S 121.52 L/s
a 3300
b 48
n 1.2
Ce $ 23,526.49
Pump - 102
S 127.78 L/s S 15.23
a 3300 a 4900
b 48 b 720
n 1.2 n 0.9
Ce $ 24,726.80 Ce $ 16,819.81
Pump - 101 XCHG - 101
S 130.80 L/s S 21.02
a 3300 a 53000
b 48 b 69000
n 1.2 n 0.8
Ce $ 25,310.81 Ce $ 1,068,514.52
Distillation Column TOPPING
Tw 0.0317 m
Shell 152979 kg
a -10000
b 600
n 0.6
Platos 80800
XCHG - 103
Ce $ 1,072,756.13
S 28.24
Torre Flash
a 7000
Tw 0.048 mb 71000
Shell 19328 kg n 0.8
a -10000 Ce $ 1,313,523.89
b 600
XCHG - 103
n 0.6
Platos 8700 S 47.21
Ce $ 282,427.47 a 4900
b 720
Torre Flash
n 0.9
Tw 0.012 m Ce $ 35,563.65
Shell 3054 kg
a -10000
b 600
n 0.6
Platos 7400
Ce $ 90,595.57
Vessel
Shell 884 kg
a -10000
b 600
n 0.6
Ce $ 31,933.57
Delta CostodeEqui $ 169,547.35
ment
0 K - 102
m^2 S 25915.55 kg/h
a 4600
b 62
n 0.8
Ce $ 273,024.83
2 K - 100
m^2 S 209682.94 kg/h
a 4600
b 62
n 0.8
Ce $ 1,428,874.47
1 K - 101
MW S 1222.11 kg/h
a 4600
b 62
n 0.8
Ce $ 22,884.36
2
m^2
MW
MW
ment
0 K - 102
S 25915.55 kg/h
a 4600
b 62
n 0.8
Ce $ 273,024.83
K - 100
MW S 209682.94 kg/h
a 4600
b 62
n 0.8
Ce $ 1,428,874.47
1 K - 101
MW S 1222.11 kg/h
a 4600
b 62
n 0.8
Ce $ 22,884.36
3
MW
MW
PC
Costos Directos
Equipos no Listados
Instalación de equipos
Tuberías
Instrumentación
Edificios
Aislamiento
Sistemas eléctricos
Instalaciones
Terreno
Facilidades auxiliares
Total CD
Costos Indirectos
Ingeniería
Construcción
Total CI
Otros Costos
Honorarios del Contratista
Contingencia
Total OC
TOTAL
$ 6,474,812.43
TOTAL $ 1,589,384,328.94
$ 58,648,968.94