PROYECTO: SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA

CUENCA DEL LAGO TITICACA


Memoria Descriptiva
LOCALIDAD: ELABORÓ:
Página 1 de 8
JULI Ing. David Alvarado
FECHA: REVISÓ:
AD 02
AGOSTO 2022 Ing. Leonardo Misaico

“SISTEMA DE TRATAMIENTO DE LAS AGUAS


RESIDUALES DE LA CUENCA DEL LAGO TITICACA”
LOCALIDAD JULI

AJUSTE DE TRAZO DE COLECTOR DE EMPALME A LA


PLANTA DE TRATAMIENTO

MEMORIA DESCRIPTIVA

AGOSTO 2022
PROYECTO: SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA
CUENCA DEL LAGO TITICACA
Memoria Descriptiva
LOCALIDAD: ELABORÓ:
Página 2 de 8
JULI Ing. David Alvarado
FECHA: REVISÓ:
AD 02
AGOSTO 2022 Ing. Leonardo Misaico

ÍNDICE
PÁG.
1 ANTECEDENTES ................................................................................................................................. 3
2 OBJETIVO ............................................................................................................................................ 3
3 MODIFICACIÓN DE TRAZO DE EMPALME C01 JULI AD02 ......................................... 3
3.1 AJUSTE DE TRAYECTORIA DEL COLECTOR DE EMPALME CON PTAR JULI .............................. 3
3.2 ACTUALIZACION DE PLANOS RESPECTO A CONEXIONES DOMICILIARIAS Y REDES
EXISTENTES ............................................................................................................................................... 4
3.3 MEMORIA DE CALCULO .................................................................................................................... 7

2
PROYECTO: SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA
CUENCA DEL LAGO TITICACA
Memoria Descriptiva
LOCALIDAD: ELABORÓ:
Página 3 de 8
JULI Ing. David Alvarado
FECHA: REVISÓ:
AD 02
AGOSTO 2022 Ing. Leonardo Misaico

1 ANTECEDENTES

De acuerdo con las etapas previstas en el Contrato de Concesión para la


elaboración de los Expedientes Técnicos, el Expediente Técnico 1 que
comprende el diseño de los colectores a gravedad se elabora y presenta en un
plazo menor al del Expediente Técnico 2 en el que se encuentra el diseño de las
Plantas de Tratamiento; debido a esta situación durante la elaboración del
Expediente Técnico 1 no era posible definir de forma definitiva el emplame del
colector de gravedad que entrega el flujo en la PTAR. En este sentido el numeral
2.1.1 del Anexo 13 del Contrato de Concesión prevé que los tramos finales de
empalme de los Colectores Primarios a las Cámaras de Bombeo y las Plantas
de Tratamiento son referenciales, dependiendo de la ubicación definitiva de las
unidades.

2 OBJETIVO

 El objetivo es presentar la actualización del trazado del colector primario


de empalme que descarga en la PTAR proyectada de Juli conforme a la
ubicación de la unidad de recepción establecida en el Expediente
Técnico 2 presentado para aprobación.
 También se incluye el ajuste de los planos, de las zonas donde se
conectan redes existentes y conexiones domiciliarias existentes.

3 MODIFICACIÓN DE TRAZO DE EMPALME C01 JULI AD02

3.1 AJUSTE DE TRAYECTORIA DEL COLECTOR DE EMPALME CON PTAR


JULI

Se procede a actualizar el trazado que parte desde el Buzón AD02-CO1-BP64


hacia el empalme en la ubicación de la PTAR proyectada de Juli.
La ubicación del ingreso a la PTAR de Juli proyectada es recopilada del
Expediente Técnico del componente 02 del proyecto “SISTEMA DE
TRATAMIENTO DE LAS AGUAS RESIDUALES DE LA CUENCA DEL LAGO
TITICACA” que se presentó para su aprobación, esta información es posterior a
la aprobación del Expediente Técnico 1 conforme a lo previsto en el Contrato
de Concesión.

En el cuadro comparativo se puede observar el cambio de trazado con


respecto a lo aprobado en el componente 1:

3
PROYECTO: SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA
CUENCA DEL LAGO TITICACA
Memoria Descriptiva
LOCALIDAD: ELABORÓ:
Página 4 de 8
JULI Ing. David Alvarado
FECHA: REVISÓ:
AD 02
AGOSTO 2022 Ing. Leonardo Misaico

Trazo Expediente Técnico 1 Trazado de empalme actualizado


aprobado

Se contempla una reubicación del buzón AD02-CO1-BP65 y del tramo AD02-


CO1-T65 de empalme al ingreso de la PTAR proyectada en el Expediente
Técnico 2.
De acuerdo a lo actualizado se tiene que el Tramo AD02-CO1-T65 cambiaria
de 100m a 63.27m y el buzón BP 65 cambiaria de ubicación tal como se
muestra en la memoria de cálculo del ANEXO I.

3.2 ACTUALIZACION DE PLANOS RESPECTO A CONEXIONES


DOMICILIARIAS Y REDES EXISTENTES

Se ajustan los planos teniendo en cuenta las redes existentes como redes
secundarias en el AD02-CO01, el tramo modificado va desde el buzón BP06
hasta el BP25 y del BP37 hasta el buzón BP48.

Estas redes existentes son de material PVC, se tiene presente que fueron
entregadas el presente año 2022 por parte de SIGMA a la Municipalidad, por lo
que sería un inconveniente social cerrarlas, por lo que se planteó su
incorporación como redes secundarias.
El caudal que reciban las redes existentes serán derivadas al colector principal
mediante empalmes, estos empalmes entraran en operación cuando se tenga
la PTAR de Juli proyectada en operación.

4
PROYECTO: SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA
CUENCA DEL LAGO TITICACA
Memoria Descriptiva
LOCALIDAD: ELABORÓ:
Página 5 de 8
JULI Ing. David Alvarado
FECHA: REVISÓ:
AD 02
AGOSTO 2022 Ing. Leonardo Misaico

Tal como se presentan en las imágenes (01-07) ya no se contempla el sellado


de las redes existentes ya que serán usadas como redes secundarias.
Imagen 01: Ubicación de colector de BP06-BP14

Imagen 02: Ubicación de colector de BP14-BP18

5
PROYECTO: SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA
CUENCA DEL LAGO TITICACA
Memoria Descriptiva
LOCALIDAD: ELABORÓ:
Página 6 de 8
JULI Ing. David Alvarado
FECHA: REVISÓ:
AD 02
AGOSTO 2022 Ing. Leonardo Misaico

Imagen 03: Ubicación de colector de BP19-BP22

Imagen 04: Ubicación de colector de BP22-BP26

6
PROYECTO: SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA
CUENCA DEL LAGO TITICACA
Memoria Descriptiva
LOCALIDAD: ELABORÓ:
Página 7 de 8
JULI Ing. David Alvarado
FECHA: REVISÓ:
AD 02
AGOSTO 2022 Ing. Leonardo Misaico

Imagen 05: Ubicación de colector de BP37-BP41

Imagen 06: Ubicación de colector de BP41-BP43

Imagen 07: Ubicación de colector de BP44-BP48

3.3 MEMORIA DE CALCULO

Con este ajuste del trazado se procedió a realizar los correspondientes cálculos
hidráulicos con los que se verifica su funcionamiento y que se están anexando.

7
PROYECTO: SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA
CUENCA DEL LAGO TITICACA
Memoria Descriptiva
LOCALIDAD: ELABORÓ:
Página 1 de 8
JULI Ing. David Alvarado
FECHA: REVISÓ:
AD 02
AGOSTO 2022 Ing. Leonardo Misaico

ANEXO I
CALCULO HIDRAULICOS
RESULTADOS DE LA SIMULACIÓN HIDRÁULICA
Escenario 3: Caudal Máximo Horario (Qmh) + Caudal de Bombeo (Qb) - Año 2049
AREA DE DRENAJE 02- 2049 REV22
Tirant /
Cota Llegada Longitud Pendiente Diámetro Manning Caudal Velocidad Tirante Tensión Tractiva
Tramo Bz Inicio Bz Llegada Cota Inicio (m) Material Diámetro Nominal Diámetro
(m) (m) (m/km) Interno (mm) n (L/s) (m/s) (m) (Pascals)
(%)
AD02-CO1 T1 AD01-CO1-BP1 AD02-CO1-BP1 3872.061 3871.584 51.25 9.31 HDPE 200mm SN4 184.6 0.01 1.50 0.67 0.03 15.72 1.45
AD02-CO1 T2 AD02-CO1-BP1 AD02-CO1-BP2 3871.584 3871.534 10.83 4.61 HDPE 200mm SN4 184.6 0.01 1.50 0.53 0.03 16.99 0.84
AD02-CO1 T3 AD02-CO1-BP2 AD02-CO1-BP3 3871.084 3866.968 59.53 69.15 HDPE 250mm SN4 230.8 0.01 44.77 3.60 0.18 76.36 29.42
AD02-CO1 T4 AD02-CO1-BP3 AD02-CO1-BP4 3866.968 3864.573 26.97 88.77 HDPE 250mm SN4 230.8 0.01 44.98 3.95 0.18 76.49 35.90
AD02-CO1 T5 AD02-CO1-BP4 AD02-CO1-BP5 3864.573 3859.295 72.21 73.10 HDPE 250mm SN4 230.8 0.01 45.09 3.69 0.13 54.94 30.79
AD02-CO1 T6 AD02-CO1-BP5 AD02-CO1-BP6 3859.295 3859.118 6.26 28.26 HDPE 250mm SN4 230.8 0.01 45.09 2.61 0.14 62.81 14.46
AD02-CO1 T7 AD02-CO1-BP6 AD02-CO1-BP7 3859.118 3855.463 38.47 95.00 HDPE 250mm SN4 230.8 0.01 45.09 4.05 0.18 76.55 37.89
AD02-CO1 T8 AD02-CO1-BP7 AD02-CO1-BP8 3855.463 3852.338 47.50 65.80 HDPE 250mm SN4 230.8 0.01 45.13 3.55 0.13 55.46 28.37
AD02-CO1 T9 AD02-CO1-BP8 AD02-CO1-BP9 3852.338 3848.767 64.92 55.00 HDPE 250mm SN4 230.8 0.01 45.13 3.33 0.13 56.29 24.62
AD02-CO1 T10 AD02-CO1-BP9 AD02-CO1-BP10 3848.468 3847.423 19.00 55.01 HDPE 250mm SN4 230.8 0.01 45.82 3.34 0.13 56.77 24.78
AD02-CO1 T11 AD02-CO1-BP10 AD02-CO1-BP11 3847.423 3846.333 24.43 44.61 HDPE 250mm SN4 230.8 0.01 45.82 2.87 0.14 58.92 21.89
AD02-CO1 T12 AD02-CO1-BP11 AD02-CO1-BP12 3846.333 3844.770 24.03 65.06 HDPE 250mm SN4 230.8 0.01 45.82 3.29 0.13 56.91 29.53
AD02-CO1 T13 AD02-CO1-BP12 AD02-CO1-BP13 3844.770 3843.868 10.74 83.96 HDPE 250mm SN4 230.8 0.01 45.82 3.61 0.13 56.37 36.19
AD02-CO1 T14 AD02-CO1-BP13 AD02-CO1-BP14 3843.868 3841.388 65.23 38.02 HDPE 250mm SN4 230.8 0.01 45.82 2.92 0.18 77.18 18.47
AD02-CO1 T15 AD02-CO1-BP14 AD02-CO1-BP15 3841.388 3840.708 67.90 10.01 HDPE 250mm SN4 230.8 0.01 45.94 1.77 0.18 77.29 6.26
AD02-CO1 T16 AD02-CO1-BP15 AD02-CO1-BP16 3840.708 3840.038 67.04 10.00 HDPE 250mm SN4 230.8 0.01 46.09 1.77 0.18 77.35 6.25
AD02-CO1 T17 AD02-CO1-BP16 AD02-CO1-BP17 3840.038 3839.413 34.00 18.39 HDPE 250mm SN4 230.8 0.01 46.11 2.24 0.18 77.42 10.32
AD02-CO1 T18 AD02-CO1-BP17 AD02-CO1-BP18 3839.413 3838.065 50.29 26.81 HDPE 250mm SN4 230.8 0.01 46.25 2.58 0.18 77.53 14.00
AD02-CO1 T19 AD02-CO1-BP18 AD02-CO1-BP19 3838.065 3836.104 70.93 27.65 HDPE 250mm SN4 230.8 0.01 46.39 2.61 0.18 77.60 14.37
AD02-CO1 T20 AD02-CO1-BP19 AD02-CO1-BP20 3836.104 3833.870 60.38 37.00 HDPE 250mm SN4 230.8 0.01 46.41 2.90 0.18 77.63 18.17
AD02-CO1 T21 AD02-CO1-BP20 AD02-CO1-BP21 3833.870 3831.455 58.78 41.09 HDPE 250mm SN4 230.8 0.01 46.47 3.01 0.18 77.72 19.76
AD02-CO1 T22 AD02-CO1-BP21 AD02-CO1-BP22 3831.455 3828.895 80.01 32.00 HDPE 250mm SN4 230.8 0.01 46.63 2.76 0.14 60.12 16.19
AD02-CO1 T23 AD02-CO1-BP22 AD02-CO1-BP23 3828.895 3826.335 80.00 32.00 HDPE 250mm SN4 230.8 0.01 46.63 2.76 0.14 60.12 16.19
AD02-CO1 T24 AD02-CO1-BP23 AD02-CO1-BP24 3826.335 3823.565 80.72 34.32 HDPE 250mm SN4 230.8 0.01 46.63 2.83 0.18 78.33 17.12
AD02-CO1 T25 AD02-CO1-BP24 AD02-CO1-BP25 3823.565 3823.285 10.74 26.03 HDPE 250mm SN4 230.8 0.01 48.04 2.58 0.15 63.93 13.88
AD02-CO1 T26 AD02-CO1-BP25 AD02-CO1-BP26 3823.050 3822.791 11.78 21.98 HDPE 250mm SN4 230.8 0.01 48.04 2.42 0.15 64.83 12.11
AD02-CO1 T27 AD02-CO1-BP26 AD02-CO1-BP27 3822.791 3822.074 42.70 16.79 HDPE 250mm SN4 230.8 0.01 48.04 2.19 0.18 79.08 9.73
AD02-CO1 T28 AD02-CO1-BP27 AD02-CO1-BP28 3822.074 3820.754 60.00 22.00 HDPE 250mm SN4 230.8 0.01 48.54 2.43 0.15 63.79 12.16
AD02-CO1 T29 AD02-CO1-BP28 AD02-CO1-BP29 3820.754 3819.751 43.40 23.11 HDPE 250mm SN4 230.8 0.01 48.54 2.47 0.15 63.45 12.66
AD02-CO1 T30 AD02-CO1-BP29 AD02-CO1-BP30 3819.497 3819.464 5.45 6.06 HDPE 315mm SN4 290.8 0.01 48.54 1.50 0.16 55.20 4.27
AD02-CO1 T31 AD02-CO1-BP30 AD02-CO1-BP31 3819.464 3819.180 47.47 5.98 HDPE 315mm SN4 290.8 0.01 48.54 1.49 0.16 54.26 4.22
AD02-CO1 T32 AD02-CO1-BP31 AD02-CO1-BP32 3819.180 3818.958 36.99 6.02 HDPE 315mm SN4 290.8 0.01 48.54 1.49 0.16 54.20 4.25
AD02-CO1 T33 AD02-CO1-BP32 AD02-CO1-BP33 3818.958 3818.508 74.85 6.01 HDPE 315mm SN4 290.8 0.01 48.54 1.49 0.17 59.28 4.24 p
AD02-CO1 T34 AD02-CO1-BP33 AD02-CO1-BP34 3818.508 3818.100 68.15 5.99 HDPE 315mm SN4 290.8 0.01 48.78 1.49 0.16 54.39 4.23
AD02-CO1 T35 AD02-CO1-BP34 AD02-CO1-BP35 3818.100 3817.650 75.01 6.00 HDPE 315mm SN4 290.8 0.01 48.78 1.49 0.16 54.37 4.24
AD02-CO1 T36 AD02-CO1-BP35 AD02-CO1-BP36 3817.650 3817.200 69.77 6.44 HDPE 315mm SN4 290.8 0.01 48.78 1.53 0.16 53.86 4.49
AD02-CO1 T37 AD02-CO1-BP36 AD02-CO1-BP37 3816.334 3816.238 16.00 6.00 HDPE 315mm SN4 290.8 0.01 48.78 1.49 0.17 59.96 4.24
AD02-CO1 T38 AD02-CO1-BP37 AD02-CO1-BP38 3816.238 3815.878 65.23 5.52 HDPE 315mm SN4 290.8 0.01 50.68 1.46 0.16 56.18 4.02
AD02-CO1 T39 AD02-CO1-BP38 AD02-CO1-BP39 3815.878 3815.425 75.50 6.00 HDPE 315mm SN4 290.8 0.01 50.68 1.51 0.18 60.60 4.30
AD02-CO1 T40 AD02-CO1-BP39 AD02-CO1-BP40 3815.425 3814.984 73.53 6.00 HDPE 315mm SN4 290.8 0.01 50.82 1.51 0.16 55.62 4.31
AD02-CO1 T41 AD02-CO1-BP40 AD02-CO1-BP41 3814.984 3814.534 75.01 6.00 HDPE 315mm SN4 290.8 0.01 50.82 1.51 0.16 55.63 4.31
AD02-CO1 T42 AD02-CO1-BP41 AD02-CO1-BP42 3814.107 3813.982 41.77 3.00 HDPE 315mm SN4 290.8 0.01 50.82 1.15 0.18 63.09 2.43
AD02-CO1 T43 AD02-CO1-BP42 AD02-CO1-BP43 3813.982 3813.752 76.69 3.00 HDPE 315mm SN4 290.8 0.01 51.14 1.16 0.18 62.04 2.43
AD02-CO1 T44 AD02-CO1-BP43 AD02-CO1-BP44 3813.452 3813.227 73.43 3.06 HDPE 315mm SN4 290.8 0.01 51.14 1.16 0.18 61.82 2.48
AD02-CO1 T45 AD02-CO1-BP44 AD02-CO1-BP45 3813.092 3813.008 57.26 1.47 HDPE 450mm SN4 415.6 0.01 71.33 0.97 0.22 53.40 1.56
AD02-CO1 T46 AD02-CO1-BP45 AD02-CO1-BP46 3813.008 3812.898 73.33 1.49 HDPE 450mm SN4 415.6 0.01 71.84 0.98 0.22 53.40 1.58
AD02-CO1 T47 AD02-CO1-BP46 AD02-CO1-BP47 3812.898 3812.829 45.93 1.50 HDPE 450mm SN4 415.6 0.01 71.84 0.98 0.22 53.77 1.59
AD02-CO1 T48 AD02-CO1-BP47 AD02-CO1-BP48 3812.829 3812.793 23.00 1.56 HDPE 450mm SN4 415.6 0.01 71.84 0.99 0.23 55.29 1.64
AD02-CO1 T49 AD02-CO1-BP48 AD02-CO1-BP49 3812.793 3812.784 10.11 0.95 HDPE 450mm SN4 415.6 0.01 71.84 0.82 0.23 55.64 1.09
AD02-CO1 T50 AD02-CO1-BP49 AD02-CO1-BP50 3812.784 3812.733 33.19 1.53 HDPE 450mm SN4 415.6 0.01 77.06 1.00 0.22 53.25 1.66
AD02-CO1 T51 AD02-CO1-BP50 AD02-CO1-BP51 3812.733 3812.720 4.46 2.92 HDPE 450mm SN4 415.6 0.01 77.06 1.27 0.22 53.38 2.80
AD02-CO1 T52 AD02-CO1-BP51 AD02-CO1-BP52 3812.720 3812.631 57.04 1.56 HDPE 450mm SN4 415.6 0.01 77.06 1.01 0.23 56.01 1.68
AD02-CO1 T53 AD02-CO1-BP52 AD02-CO1-BP53 3812.631 3812.488 100.98 1.42 HDPE 450mm SN4 415.6 0.01 77.54 0.97 0.23 56.49 1.56
AD02-CO1 T54 AD02-CO1-BP53 AD02-CO1-BP54 3812.488 3812.338 100.98 1.49 HDPE 450mm SN4 415.6 0.01 77.54 0.99 0.23 55.97 1.62
AD02-CO1 T55 AD02-CO1-BP54 AD02-CO1-BP55 3812.338 3812.188 100.02 1.50 HDPE 450mm SN4 415.6 0.01 77.54 0.99 0.23 55.96 1.63
AD02-CO1 T56 AD02-CO1-BP55 AD02-CO1-BP56 3812.188 3812.087 67.48 1.50 HDPE 450mm SN4 415.6 0.01 77.54 1.00 0.24 57.54 1.64
RESULTADOS DE LA SIMULACIÓN HIDRÁULICA
Escenario 3: Caudal Máximo Horario (Qmh) + Caudal de Bombeo (Qb) - Año 2049
AREA DE DRENAJE 02- 2049 REV22
Tirant /
Cota Llegada Longitud Pendiente Diámetro Manning Caudal Velocidad Tirante Tensión Tractiva
Tramo Bz Inicio Bz Llegada Cota Inicio (m) Material Diámetro Nominal Diámetro
(m) (m) (m/km) Interno (mm) n (L/s) (m/s) (m) (Pascals)
(%)
AD02-CO1 T57 AD02-CO1-BP56 AD02-CO1-BP57 3812.087 3812.053 31.13 1.08 HDPE 450mm SN4 415.6 0.01 77.54 0.87 0.23 56.47 1.24
AD02-CO1 T58 AD02-CO1-BP57 AD02-CO1-BP58 3812.053 3811.945 63.21 1.70 HDPE 450mm SN4 415.6 0.01 77.54 1.04 0.24 56.69 1.81
AD02-CO1 T59 AD02-CO1-BP58 AD02-CO1-BP59 3811.945 3811.920 11.39 2.26 HDPE 450mm SN4 415.6 0.01 77.54 1.16 0.26 62.01 2.29
AD02-CO1 T60 AD02-CO1-BP59 AD02-CO1-BP60 3811.920 3811.895 13.50 1.85 HDPE 450mm SN4 415.6 0.01 91.71 1.12 0.27 66.07 2.06
AD02-CO1 T61 AD02-CO1-BP60 AD02-CO1-BP61 3811.895 3811.777 99.60 1.18 HDPE 450mm SN4 415.6 0.01 91.71 0.94 0.28 67.47 1.41
AD02-CO1 T62 AD02-CO1-BP61 AD02-CO1-BP62 3811.777 3811.657 100.00 1.20 HDPE 450mm SN4 415.6 0.01 91.71 0.94 0.28 67.28 1.43
AD02-CO1 T63 AD02-CO1-BP62 AD02-CO1-BP63 3811.657 3811.537 100.00 1.20 HDPE 450mm SN4 415.6 0.01 91.71 0.94 0.28 66.97 1.43
AD02-CO1 T64 AD02-CO1-BP63 AD02-CO1-BP64 3811.537 3811.417 100.00 1.20 HDPE 450mm SN4 415.6 0.01 91.71 0.94 0.25 59.25 1.43
AD02-CO1 T65 AD02-CO1-BP64 AD02-CO1-BP65 3811.417 3810.940 63.27 7.54 HDPE 450mm SN4 415.6 0.01 91.71 1.89 0.19 45.24 6.42
AD02-RS1 T66 AD02-RS1-BE1 AD02-CO1-BP9 3848.999 3848.967 4.25 7.59 PVC 200mm SN2 192.2 0.01 1.50 0.58 0.03 15.62 1.28
AD02-RS10 T75 AD02-RS10-BE10 AD02-CO1-BP59 3812.805 3812.785 3.09 6.47 PVC 200mm SN2 192.2 0.01 6.80 0.85 0.07 34.29 2.19
AD02-RS11 T76 AD02-RS11-BE11 AD02-CO1-BP59 3812.803 3812.721 10.21 8.02 PVC 200mm SN2 192.2 0.01 7.36 0.94 0.07 34.71 2.68
AD02-RS2 T67 AD02-RS2-BE2 AD02-CO1-BP14 3841.965 3841.924 4.14 9.83 PVC 200mm SN2 192.2 0.01 1.50 0.64 0.03 15.17 1.57
AD02-RS3 T68 AD02-RS3-BE3 AD02-CO1-BP21 3831.711 3831.685 2.62 10.01 PVC 200mm SN2 192.2 0.01 1.50 0.64 0.03 15.14 1.59
AD02-RS4 T69 AD02-RS4-BE4 AD02-CO1-BP24 3824.015 3823.950 3.26 19.92 PVC 250mm SN2 240.2 0.01 1.50 0.79 0.03 10.63 2.58
AD02-RS5 T70 AD02-RS5-BE5 AD02-CO1-BP37 3816.694 3816.658 3.22 11.19 PVC 200mm SN2 192.2 0.01 1.50 0.67 0.03 14.96 1.73
AD02-RS6 T71 AD02-RS6-BE6 AD02-CO1-BP42 3814.290 3814.253 3.34 10.96 PVC 200mm SN2 192.2 0.01 1.50 0.66 0.03 15.00 1.70
AD02-RS7 T72 AD02-RS7-BE7 AD02-CO1-BP44 3813.811 3813.537 3.66 74.95 PVC 355mm SN2 341 0.01 20.19 2.61 0.08 22.98 21.74
AD02-RS8 T73 AD02-RS8-BE8 AD02-CO1-BP45 3813.734 3813.705 3.62 7.96 PVC 200mm SN2 192.2 0.01 1.50 0.59 0.03 15.51 1.33
AD02-RS9 T74 AD02-RS9-BE9 AD02-CO1-BP49 3813.511 3813.461 7.90 6.33 PVC 200mm SN2 192.2 0.01 5.21 0.79 0.06 29.84 1.92
T-PTAR AD02-CO1-BP65 PTAR 3810.940 3810.810 8.57 15.17 HDPE 450mm SN2 422.4 0.01 91.71 2.43 0.18 42.99 11.15
AD02 (CO01) JULI REV22
Buzones ALTIMETRIA PLANIMETRIA
Cota Cota
X Y
de Tapa de Fondo
AD01-CO1-BP1 3873.387 3872.061 450876.59 8207429.12
AD02-CO1-BP1 3873.119 3871.584 450859.06 8207380.95
AD02-CO1-BP2 3872.436 3871.084 450848.81 8207377.45
AD02-CO1-BP3 3868.578 3866.968 450798.94 8207344.94
AD02-CO1-BP4 3866.419 3864.573 450777.77 8207328.23
AD02-CO1-BP5 3861.026 3859.295 450713.77 8207294.80
AD02-CO1-BP6 3860.401 3859.118 450709.55 8207290.18
AD02-CO1-BP7 3857.015 3855.463 450674.14 8207275.14
AD02-CO1-BP8 3853.901 3852.338 450629.94 8207257.76
AD02-CO1-BP9 3850.248 3848.468 450569.58 8207233.84
AD02-CO1-BP10 3849.079 3847.423 450553.39 8207223.90
AD02-CO1-BP11 3847.575 3846.333 450533.86 8207209.22
AD02-CO1-BP12 3846.236 3844.770 450514.90 8207194.46
AD02-CO1-BP13 3845.618 3843.868 450506.37 8207187.93
AD02-CO1-BP14 3843.124 3841.388 450454.89 8207147.87
AD02-CO1-BP15 3842.237 3840.708 450401.32 8207106.15
AD02-CO1-BP16 3841.529 3840.038 450348.55 8207064.80
AD02-CO1-BP17 3841.012 3839.413 450321.50 8207044.21
AD02-CO1-BP18 3839.783 3838.065 450279.97 8207015.86
AD02-CO1-BP19 3837.576 3836.104 450216.03 8206985.16
AD02-CO1-BP20 3835.664 3833.870 450158.21 8206967.75
AD02-CO1-BP21 3833.700 3831.455 450099.72 8206961.96
AD02-CO1-BP22 3830.879 3828.895 450019.72 8206960.73
AD02-CO1-BP23 3828.092 3826.335 449939.72 8206959.83
AD02-CO1-BP24 3825.364 3823.565 449859.02 8206958.24
AD02-CO1-BP25 3825.031 3823.050 449848.52 8206955.97
AD02-CO1-BP26 3824.660 3822.791 449838.56 8206962.27
AD02-CO1-BP27 3823.579 3822.074 449795.87 8206961.43
AD02-CO1-BP28 3822.267 3820.754 449735.87 8206960.59
AD02-CO1-BP29 3821.540 3819.497 449692.48 8206959.97
AD02-CO1-BP30 3821.540 3819.464 449688.53 8206956.22
AD02-CO1-BP31 3821.040 3819.180 449641.06 8206956.00
AD02-CO1-BP32 3820.810 3818.958 449604.09 8206954.82
AD02-CO1-BP33 3820.271 3818.508 449529.24 8206954.31
AD02-CO1-BP34 3819.680 3818.100 449461.09 8206953.85
AD02-CO1-BP35 3819.350 3817.650 449386.08 8206953.33
AD02-CO1-BP36 3818.810 3816.334 449316.31 8206952.86
AD02-CO1-BP37 3818.720 3816.238 449300.31 8206952.75
AD02-CO1-BP38 3818.230 3815.878 449235.09 8206951.65
AD02-CO1-BP39 3817.770 3815.425 449159.60 8206950.32
AD02-CO1-BP40 3817.150 3814.984 449086.08 8206949.14
AD02-CO1-BP41 3816.810 3814.107 449011.06 8206948.89
AD02-CO1-BP42 3816.700 3813.982 448969.33 8206947.16
AD02-CO1-BP43 3816.540 3813.452 448892.65 8206945.87
AD02-CO1-BP44 3816.240 3813.092 448819.24 8206944.63
AD02-CO1-BP45 3816.120 3813.008 448761.99 8206943.67
AD02-CO1-BP46 3816.120 3812.898 448688.67 8206942.44
AD02-CO1-BP47 3816.110 3812.829 448642.75 8206941.66
AD02-CO1-BP48 3816.100 3812.793 448619.75 8206941.23
AD02-CO1-BP49 3816.050 3812.784 448612.45 8206948.21
AD02-CO1-BP50 3815.652 3812.733 448622.77 8206979.75
AD02-CO1-BP51 3815.656 3812.720 448619.74 8206983.03
AD02-CO1-BP52 3815.047 3812.631 448637.59 8207037.20
AD02-CO1-BP53 3814.779 3812.488 448666.36 8207134.00
AD02-CO1-BP54 3814.632 3812.338 448694.71 8207230.92
AD02-CO1-BP55 3814.633 3812.188 448722.77 8207326.93
AD02 (CO01) JULI REV22
Buzones ALTIMETRIA PLANIMETRIA
Cota Cota
X Y
de Tapa de Fondo
AD02-CO1-BP56 3814.499 3812.087 448743.91 8207391.01
AD02-CO1-BP57 3814.388 3812.053 448754.54 8207420.27
AD02-CO1-BP58 3814.597 3811.945 448781.86 8207477.27
AD02-CO1-BP59 3814.647 3811.920 448785.80 8207487.96
AD02-CO1-BP60 3814.449 3811.895 448774.31 8207495.04
AD02-CO1-BP61 3814.403 3811.777 448767.39 8207594.40
AD02-CO1-BP62 3814.192 3811.657 448757.84 8207693.94
AD02-CO1-BP63 3814.015 3811.537 448747.83 8207793.44
AD02-CO1-BP64 3813.652 3811.417 448737.55 8207892.91
AD02-CO1-BP65 3812.940 3810.940 448757.51 8207952.95
AD02-RS1-BE1 3850.399 3848.999 450569.70 8207238.09
AD02-RS2-BE2 3843.150 3841.965 450455.48 8207151.97
AD02-RS3-BE3 3833.681 3831.711 450101.04 8206964.23
AD02-RS4-BE4 3825.395 3824.015 449861.83 8206959.89
AD02-RS5-BE5 3818.724 3816.694 449300.39 8206949.53
AD02-RS6-BE6 3816.720 3814.290 448971.92 8206949.27
AD02-RS7-BE7 3816.241 3813.811 448821.85 8206947.19
AD02-RS8-BE8 3816.089 3813.734 448763.80 8206946.81
AD02-RS9-BE9 3815.986 3813.511 448608.81 8206941.20
AD02-RS10-BE10 3814.623 3812.805 448788.73 8207486.98
AD02-RS11-BE11 3814.668 3812.803 448792.42 8207495.73
T

T
T
D.1
C.

.2
D
C.

.3 29
D .3
C. D
C.
28
.3
D
C.

.4
D
C.
27
.3
D
C.

.5
D
C.
T .3
26
D
C.

25
.3
D
C.

24
.6 .3
D D
C. C.
23
D.3
C.

.7
D
C.

T
D.8
C.

22
.3
D
C.

21
.3
D
C.
D.9
C.

0
.1
D
C.

20
.3
D
C.

1
.1
D
C.
19
D.3
C.

2
D.1
C.
3

18
.3
D.1

D
C.

C.

17
.3
D
C.

16
.3
D
C.

15
.3
D
C.
14
D.3
C.

13
.3
D
C.

12
.3
D
C.
4
D.1
C.

5
.1
D
C.
6
.1 11
D .3
C. D
C.

10
.3
D
C.

7
.1
D
C.

8
.1
D 09
C. .3
D
C.

08
.3
9

D
C.
D.1
C.

07
.3
D
C.
0
.2
D
C.

06
.3
1

D
C.
D.2
C.

2
.2
D
C.

3
.2
D
C.

4
.2
D
C.

05
.3
D
C.
5
.2
D
C.
N

6
04

.2 T
D
D.3

C.
C.

7
.2
D
C.

8
.2
D 03
C. .3
D
C.
9
D.2

02
.3
C.

D
C.

01
.3
D
C. T

0
D.3
C.
PLANTA

1
.3
D
C.

2
.3
D
C.

del Titicaca
.3
D
C.

Operadora Ecológica
.3
D
C. T

PERFIL LONGITUDINAL
5
.3
D
C.

6
.3
D
C.
7
D.3
C.

8
D.3
C.

9
.3
D
C.

consorcio

T I T I C A C A
LAGO AZ U L
0
.4
D
C.

OPERADORA ECOLÓGICA DEL TITICACA CONSORCIO LAGO AZUL TITICACA


1
.4
D
C.

2
.4
D
C.

3
.4
D
C.
4
D.4
C.

5
D.4
C.

T
6
D.4
C.

7
D.4
C.
8
D.4
C.

9
.4
D
C.

00
.3
D
C.

0
.5
D
C.
1
D.5
C.

T
2
D.5
C.

99
.2
D
C.
98
.2
D
C.

3
.5
D
C.

4
.5
D
C.

5
.5
D
C.
6
D.5
C.

97
.2
T

7 D
.5 C.
D
C.
DE LA CUENCA DEL LAGO TITICACA”

96
.2
D
C.

8
.5
D
C.
9
D.5
C.

“SISTEMA DE TRATAMIENTO DE LAS AGUAS RESIDUALES

N
ÁREA DE DRENAJE 2 - COLECTOR CO1 - PLANTA Y PERFIL LONGITUDINAL (01/07)
SISTEMA DE COLECTORES PRINCIPALES PROYECTADOS DE AGUAS RESIDUALES
GCI

GCI

LEYENDA

GCI
PLANO CLAVE

CUADRO DE NORMAS TÉCNICAS VIGENTES

AD02-2
STCT-JLI-SHC-PL-AD2-CO1-REV22
STCT-JLI-SHC-PL-AD2-CO1-REV22 OPERADORA ECOLÓGICA DEL TITICACA CONSORCIO LAGO AZUL TITICACA
ÁREA DE DRENAJE 2 - COLECTOR CO1 - PLANTA Y PERFIL LONGITUDINAL (02/07)
del Titicaca
T I T I C A C A
SISTEMA DE COLECTORES PRINCIPALES PROYECTADOS DE AGUAS RESIDUALES
Operadora Ecológica
LAGO AZ U L
consorcio
DE LA CUENCA DEL LAGO TITICACA”
AD02-3
“SISTEMA DE TRATAMIENTO DE LAS AGUAS RESIDUALES
PERFIL LONGITUDINAL
CUADRO DE NORMAS TÉCNICAS VIGENTES
LEYENDA
PLANTA
PLANO CLAVE
C.D.
52
C.D.5
3
C.D.5
4
C.D.5
5
C.D.5
6
C.D.
57
T
C.D.
58
C.D.
59
C.D.
60
C.D.
61
C.D.6

T
2
C.D.
63
C.D.6
4
C.D.6
5
C.D.2
97
T C.D.2
96
C.D.
66
C.D.6
7
C.D.6 C.D.2
8 95
C.D.
69
C.D. C.D.
70 294
C.D.2
C.D.7 93
1
C.D.
72
C.D.7 C.D.
3 292
C.D.
74
C.D.
T 291
C.D.
75
C.D.
290
C.D.
289
C.D.
76
C.D.
77 C.D.
C.D.2 288
87
C.D.
286
T
C.D.
285
C.D.
115
C.D.
78
C.D.
114

N
C.D.
113
C.D.1 C.D.
12 79
C.D.8
C.D.1 0
11 T
C.D.1 C.D.
10 81
C.D.
109
C.D.
T 82
C.D.1

N
08
C.D.2
84
C.D.
83
C.D.1
07
C.D.
283
C.D.
84
C.D.8
C.D. 5
106
C.D.8
6
C.D.
T 105 C.D.1
04
C.D.
103
C.D.
T 282
C.D.
87
C.D.8
8 C.D.2
81
C.D.
89
C.D.
90 C.D.
280
C.D.9
1 C.D.
279
C.D.
92
C.D.2
78
C.D.1
02
C.D.

T
93
C.D. C.D.
101 C.D.
100 C.D.99 C.D.9 C.D.9
8 C.D.9 94
T 7 5
C.D.9
6
T
T
T
C.D.2
77
C.D.2
76
C.D.2
75
C.D.2
74
C.D.2
73
C.D.
272
C.D.
271
C.D.
250 C.D.
270
C.D.
251 C.D.
252 C.D.
T 253 C.D.
C.D. C.D.2 269
C.D. 255 68
254
C.D. C.D.2
265 67
C.D.
256 C.D.
C.D. 266
C.D. 264
263
C.D. C.D. C.D. C.D.
257 258 C.D. C.D.2 261 262
259 60

GCI
GCI
GCI
GCI

GCI

GCI
T
N C.D.249
C.D.248 C.D.247 C.D.246
C.D.245
C.D.244
C.D.243 C.D.242 C.D.241 C.D.240
C.D.239 C.D.238 C.D.237
C.D.236
C.D.235

N
T C.D.142 C.D.143
C.D.144
C.D.141

C.D.140
T
T C.D.131
C.D.132 T
C.D.134
C.D.135 C.D.137 C.D.136

T T C.D.138
C.D.139

C.D.125 C.D.126 C.D.127


C.D.124 C.D.133
C.D.123 C.D.128 C.D.129 C.D.130
C.D.115 C.D.120 C.D.119 C.D.121 C.D.122
C.D.114 C.D.117 C.D.116 C.D.118
C.D.109 C.D.110 C.D.113
C.D.112
C.D.111

PLANO CLAVE
PLANTA

LEYENDA

CUADRO DE NORMAS TÉCNICAS VIGENTES

PERFIL LONGITUDINAL

“SISTEMA DE TRATAMIENTO DE LAS AGUAS RESIDUALES

AD02-4
DE LA CUENCA DEL LAGO TITICACA”
consorcio
LAGO AZ U L
Operadora Ecológica
SISTEMA DE COLECTORES PRINCIPALES PROYECTADOS DE AGUAS RESIDUALES
T I T I C A C A
del Titicaca
ÁREA DE DRENAJE 2 - COLECTOR CO1 - PLANTA Y PERFIL LONGITUDINAL (03/07)
OPERADORA ECOLÓGICA DEL TITICACA CONSORCIO LAGO AZUL TITICACA STCT-JLI-SHC-PL-AD2-CO1-REV22
GCI

GCI

GCI
N

N
C.D.210 C.D.208
C.D.209
C.D.212 C.D.211

C.D.217 C.D.216 C.D.213


C.D.224 C.D.223 C.D.215 C.D.214
C.D.222 C.D.221 C.D.220 C.D.219 C.D.218

C.D.230 C.D.226
C.D.231 C.D.229 C.D.228

C.D.236
C.D.235
C.D.234 C.D.233
C.D.232 C.D.227 C.D.225 T
C.D.237

T T C.D.172
C.D.169 C.D.170 C.D.171 C.D.173

T T C.D.168

C.D.165 C.D.166 C.D.167

T T C.D.160
C.D.161 C.D.162
C.D.163
C.D.164

C.D.158

T C.D.149 C.D.150
T C.D.153 C.D.154 C.D.155 C.D.156
C.D.157 C.D.159

C.D.146 C.D.147 C.D.148


C.D.145 C.D.151
C.D.142 C.D.143
C.D.144 C.D.152

PLANO CLAVE
PLANTA

LEYENDA

CUADRO DE NORMAS TÉCNICAS VIGENTES


T

PERFIL LONGITUDINAL

“SISTEMA DE TRATAMIENTO DE LAS AGUAS RESIDUALES

AD02-5
DE LA CUENCA DEL LAGO TITICACA”
consorcio
LAGO AZ U L
Operadora Ecológica
SISTEMA DE COLECTORES PRINCIPALES PROYECTADOS DE AGUAS RESIDUALES
T I T I C A C A
del Titicaca
ÁREA DE DRENAJE 2 - COLECTOR CO1 - PLANTA Y PERFIL LONGITUDINAL (04/07)
OPERADORA ECOLÓGICA DEL TITICACA CONSORCIO LAGO AZUL TITICACA STCT-JLI-SHC-PL-AD2-CO1-REV22
GCI

GCI

GCI
N
C.D.173 C.D.171 C.D.170
C.D.172
C.D.175 C.D.174
C.D.176

C.D.177

T
C.D.179 C.D.178
C.D.182 C.D.181
C.D.183

C.D.186 C.D.185
C.D.184

T C.D.180

C.D.197 C.D.195
C.D.193 C.D.192 C.D.191 C.D.190
C.D.189
C.D.188
C.D.187

T T
T
C.D.196 C.D.194
C.D.199 C.D.198

C.D.209
C.D.208 C.D.210
C.D.205
C.D.206 C.D.207

C.D.202

C.D.201
C.D.203

C.D.204

C.D.200

PLANTA PLANO CLAVE

LEYENDA

CUADRO DE NORMAS TÉCNICAS VIGENTES

PERFIL LONGITUDINAL

“SISTEMA DE TRATAMIENTO DE LAS AGUAS RESIDUALES

AD02-6
DE LA CUENCA DEL LAGO TITICACA”
consorcio
L AGO AZ U L
Operadora Ecológica
SISTEMA DE COLECTORES PRINCIPALES PROYECTADOS DE AGUAS RESIDUALES
T I T I C A C A
del Titicaca
ÁREA DE DRENAJE 2 - COLECTOR CO1 - PLANTA Y PERFIL LONGITUDINAL (05/07)
OPERADORA ECOLÓGICA DEL TITICACA CONSORCIO LAGO AZUL TITICACA STCT-JLI-SHC-PL-AD2-CO1-REV2
GCI

GCI

GCI
N
N

PLANO CLAVE
PLANTA

LEYENDA

CUADRO DE NORMAS TÉCNICAS VIGENTES

PERFIL LONGITUDINAL

“SISTEMA DE TRATAMIENTO DE LAS AGUAS RESIDUALES

AD02-7
DE LA CUENCA DEL LAGO TITICACA”
consorcio
LAGO AZ U L
Operadora Ecológica
SISTEMA DE COLECTORES PRINCIPALES PROYECTADOS DE AGUAS RESIDUALES
T I T I C A C A
del Titicaca
ÁREA DE DRENAJE 2 - COLECTOR CO1 - PLANTA Y PERFIL LONGITUDINAL (06/07)
OPERADORA ECOLÓGICA DEL TITICACA CONSORCIO LAGO AZUL TITICACA STCT-JLI-SHC-PL-AD2-CO1-REV22
GCI

GCI

GCI
N

N
PLANO CLAVE
PLANTA

LEYENDA

CUADRO DE NORMAS TÉCNICAS VIGENTES

PERFIL LONGITUDINAL

“SISTEMA DE TRATAMIENTO DE LAS AGUAS RESIDUALES

AD02-8
DE LA CUENCA DEL LAGO TITICACA”
consorcio
LAGO AZ U L
Operadora Ecológica
SISTEMA DE COLECTORES PRINCIPALES PROYECTADOS DE AGUAS RESIDUALES
T I T I C A C A
del Titicaca
ÁREA DE DRENAJE 2 - COLECTOR CO1 - PLANTA Y PERFIL LONGITUDINAL (07/07)
OPERADORA ECOLÓGICA DEL TITICACA CONSORCIO LAGO AZUL TITICACA STCT-JLI-SHC-PL-AD2-CO1-REV22
GCI

GCI

GCI
253
C.D. 252
C.D. 251
C.D.
T
250
C.D.

C.D.207 C.D.206
C.D.205

N N
T
C.D.177

C.D.176
103 C.D.174 C.D.175
C.D.

04
C.D.1 105
C.D. T
106
C.D.

N
C.D.225 T

C.D.131
C.D.132 T
C.D.134
C.D.135 C.D.137 C.D.136

C.D.133
C.D.130

T
T
C.D.152
5
.3
D
C.

6
.3
D
C.

7
D.3
C.

8
D.3
C.
9
D.3
C.

T
99

98
.2

.2
D

D
C.

C.
0
.4
D
C.

1
.4
D
C.

97
.2
D
C.

96
.2
D
C.
N
N
3
.5
D
C.

T
4
.5

5
D

.5
C.

D
C.
6
D.5
C.

7
.5
D
C.

8
.5
D
9

C.
D.5
C.

N
PLANO CLAVE
PLANTA

LEYENDA

CUADRO DE NORMAS TÉCNICAS VIGENTES

PERFIL LONGITUDINAL

“SISTEMA DE TRATAMIENTO DE LAS AGUAS RESIDUALES

AD02-9
DE LA CUENCA DEL LAGO TITICACA”
consorcio
LAGO AZ U L
Operadora Ecológica
SISTEMA DE COLECTORES PRINCIPALES PROYECTADOS DE AGUAS RESIDUALES
T I T I C A C A
del Titicaca
ÁREA DE DRENAJE 2 - EMPALMES - PLANTA Y PERFIL LONGITUDINAL (01/02)
OPERADORA ECOLÓGICA DEL TITICACA CONSORCIO LAGO AZUL TITICACA STCT-JLI-SHC-PL-AD2-LL-REV22
GCI

GCI

GCI
C.D.201

N
T
C.D.198

T T C.D.188 C.D.190 C.D.191


C.D.196 C.D.197
C.D.199

C.D.189
C.D.187

C.D.185 C.D.185 C.D.186


C.D.184 C.D.184

C.D.183
C.D.181 C.D.182

N
N

N
N

PLANO CLAVE
PLANTA

LEYENDA

CUADRO DE NORMAS TÉCNICAS VIGENTES

PERFIL LONGITUDINAL

“SISTEMA DE TRATAMIENTO DE LAS AGUAS RESIDUALES

AD02-10
DE LA CUENCA DEL LAGO TITICACA”
consorcio
LAGO AZ U L
Operadora Ecológica
SISTEMA DE COLECTORES PRINCIPALES PROYECTADOS DE AGUAS RESIDUALES
T I T I C A C A
del Titicaca
ÁREA DE DRENAJE 2 - EMPALMES - PLANTA Y PERFIL LONGITUDINAL (02/02)
OPERADORA ECOLÓGICA DEL TITICACA CONSORCIO LAGO AZUL TITICACA STCT-JLI-SHC-PL-AD2-LL-REV22

También podría gustarte