Bridge Engineering
Perronet´s Bridges
Philosophy:
Diminish the frontal area
of the bridge in front the
floods in order to avoid
the scour of foundations
and the bridge collapse
Perronet´s Bridges
Structural behaviour
g1+ g2
q+Q
Perronet´s Bridges
• Weakness
The bridge must be built on a complete false
work
The false work must be retired only when
bridge has been totally completed
• Strong points
The free area of the bridge obstacle is
increased, so flood discharges are also
increased and the danger of bridge collapse
by pier scour is disminished
Agustín de Betancourt
Escuela de Ingenieros de Caminos, 1802
Sejourné (Grands Voutes)
La lucha contra la gravedad: Los puentes de hierro
Figthing to gravity: iron bridges
Eugene Freyssinet
El reto de la economía: El hormigón pretensado
The economic challenge: prestressed concrete
El reto de la economía: El hormigón pretensado
The economic challenge: prestressed concrete
El reto de la economía: El hormigón pretensado
The economic challenge: prestressed concrete
El reto de la economía: El hormigón pretensado
The economic challenge: prestressed concrete
El reto de la economía: El hormigón pretensado
The economic challenge: prestressed concrete
σc p = 4MPa
ε ci = -4/20000
ε ci = -2 E-4
ε cc = -2,5x 2 E-4
ε cc = -5 E-4
ε ci+ε cc = -7 E-4
ε cs = -3 E-4
ε ci+ε cc + ε cs =10E-4
El reto de la economía: El hormigón pretensado
The economic challenge: prestressed concrete
Por fin! Estructuras trabajando a tracción
Finally !! Structures working in tension
Ciencia Técnica
Arte