DESCRIPCION PRESUPUESTO DE OBRA ACUMULADO ANTERIOR AVANCE ACTUAL ACUMULADO ACTUAL SALDO POR EJECUTAR
Ítem
PARTIDA UA UND METRADO P.U. S/. PARCIAL S/. Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. %
2.00 DEMOLICIONES
M3
2.01 DEMOLICION DE SARDINEL DE CONCRETO 11.55 293.68 3,392.00 - - 0% 11.55 3,392.00 100% 11.55 3,392.00 100.0% - - 0.00%
M3
3.01 EXCAVACION A MANO EN TERRENO NORMAL 4.39 57.61 252.91 - - 0% 4.39 252.91 100% 4.39 252.91 100.0% - - 0.00%
M3
3.02 ELIMINACION DE MATERIAL EXCEDENTE 15.55 90.42 1,406.03 - - 0% 15.55 1,406.03 100% 15.55 1,406.03 100.0% - - 0.00%
4.00 PAVIMENTOS
M2
4.03 IMPRIMACION ASFALTICA (MANUAL) 29.04 13.50 392.04 - - 0% 29.04 392.04 100% 29.04 392.04 100.0% - - 0.00%
SUB TOTAL EN SOLES (NO INCLUYE IGV) S/. 27,698.66 - 27,698.66 27,698.66 -
METRADOS
GLB
2.00 DEMOLICIONES
INGRESO A PANAMERICANA
1.00 15.20 0.50 0.350 2.66
SALIDA DE
PANAMERICANA
1.00 50.80 0.50 0.350 8.89
SALIDA DE
PANAMERICANA
1.00 50.80 0.19 0.350 3.38
SALIDA DE
PANAMERICANA
50% 1.00 50.80 0.19 0.350 5.07
EXCAVACION
INGRESO A PANAMERICANA
30% 1.00 15.20 0.19 0.550 2.06
0.00
SALIDA DE
PANAMERICANA
30% 1.00 50.80 0.19 0.550 6.90
4.00 PAVIMENTOS
CONFORMACION Y COMPACTACION A M2
NIVEL SUBRASANTE
INGRESO A PANAMERICANA
1.00 15.20 0.44 6.69
SALIDA DE
PANAMERICANA
1.00 50.80 0.44 22.35
SALIDA DE
PANAMERICANA
1.00 50.80 0.44 22.35
SALIDA DE
PANAMERICANA
1.00 50.80 0.44 22.35
5.01 RED DE DISTRIBUCION INTERNA CON TUBERIA DE PVC C-10 O 3/4" 50.80 M
CANTIDAD
SUB TRAMO FECHA UBICACIÓN TURNO SENTIDO KM. INICIO KM. FIN GRUPO DE TRABAJO
(und)
TOTAL 675.00